Optimized and Base lined project schedule

profileTheGame
PMGT540Rubric-3BaselinedSchedule.pdf

PMGT 540 Assignment Rubric 3-Optimized Baselined Schedule

Topic Criteria Weight Rating 0 to 4

Score Rating % * Weight

Student 1

Organization and Content

The scope of the project is covered in the WBS, work effort or duration is estimated for tasks and dependencies are reflected in terms of what tasks control other tasks. MS Project best practices are adhered to including basic set up in the Backstage, autoscheduling and use of the calendar.

40% 4 40

Budget and Control

Resource sheet is complete and tasks have been appropriately assigned to resources so that the project budget is clear and complete. A baseline has been established so that the project team can monitor and report on variances.

40% 4 40

Formatting and Presentation

Project plan reflects an attempt to establish a dynamic model with few constraints and a navigable critical path.

10% 4 10

Optimization 1 -2 page summary detailing the techniques you used to reduce the schedule and budget and to relieve any over-allocated resources.

10% 4 10

Comments 0 Assignment total

100% 100 Assignment total - 100 of 100