Explain the Academic Research Lifecycle
Perceived Roles of the Internal Auditor in Business Continuity Planning in the
Government Sector
Dissertation
Submitted to Northcentral University
Graduate Faculty in the School of Business and Technology Management
In Partial Fulfillment of the
Requirements for the Degree of
DOCTOR OF PHILOSOPHY
by
MONDAY RUFUS
Prescott Valley, Arizona
September 2016
All rights reserved
INFORMATION TO ALL USERS The quality of this reproduction is dependent upon the quality of the copy submitted.
In the unlikely event that the author did not send a complete manuscript and there are missing pages, these will be noted. Also, if material had to be removed,
a note will indicate the deletion.
All rights reserved. This work is protected against unauthorized copying under Title 17, United States Code
Microform Edition © ProQuest LLC.
ProQuest LLC. 789 East Eisenhower Parkway
P.O. Box 1346 Ann Arbor, MI 48106 - 1346
ProQuest
Published by ProQuest LLC ( ). Copyright of the Dissertation is held by the Author.
ProQuest Number:
10181966
10181966
2016
Approval Page
Perceived Roles of the Internal Auditor in Business Continuity Planning in the
Government Sector
By
MONDAY RUFUS
Approved by:
0 C:~o\)12r I? 20 · / _____ __..!_ I~'
Chair: Dr. Edward Kim Date
Member: Dr. Julia Watkins
Member: Dr. Joseph Oloyedc
Certified by:
Dean of School: Dr. Peter Bcmski Date
I I
11 l I l
iii
Abstract
A government agency is expected to implement a plan to be followed should an
emergency arise. This minimizes the impact of disruption and ensures the quick
resumption of operations. But without the involvement of those with the right expertise,
management of a government agency could assume undesirable business continuity risks.
The purpose of this qualitative case study was to understand the perceived roles of the
internal auditor in business continuity planning within the government sector. The
findings arose from data collected from interviews with individuals using a purposive
convenience sample. The data analysis resulted in five themes. The five themes for the
overarching research question included: (a) significant negative impact, (b) obstacles, (c)
major roles, (d) areas to be excluded from the internal auditor, and (e) internal auditor’s
independence. Findings from the study indicated that the government sector did not
consider risks that could hinder the entity from successful mitigation of disruptions
because preference was given to other pressing issues. Other impediments affecting
business continuity planning included a lack of adequate communication, resources,
periodic testing, staff training, inept personnel, inaccuracy of business impact analysis,
and the notion that a disruption would never occur. The Internal auditor’s involvement in
business continuity planning in the government sector should be in an advisory capacity
because of their independence and knowledge of the entity and the risks affecting the
organization. To mitigate a threat to the internal auditor’s independence and promote
objectivity, the organization, and internal auditor should implement safeguards. The
implications of this study included providing valuable insights to management,
policymakers, and the internal auditor about the perceived roles of the internal auditor in
iv
business continuity planning in the government sector and how to utilize his or her
expertise while ensuring independence and objectivity. Three recommendations for
future research included: (a) whether the internal auditor should play a role in
maintenance and update of the business continuity plan; (b) the reason a governmental
sector would be reluctant to test their business continuity plans periodically; and (c) the
roles of the internal auditor in business impact analysis during the development of a
business continuity plan.
v
Acknowledgements
A lot of people were instrumental in my completion of this journey. First, I
would like to thank my wife, Ugochi, for your unwavering support throughout the
duration of this endeavor. This milestone would not be impossible without your
understanding, sacrifice, and support. To my four children, Tina, Jeffrey, Chisom, and
Jonathan, I say thank you for all of your support. Even though our vacations plans were
affected because of required weekly assignments, you never relented in showing your
support. I would also like to extend my hearty thank you to my late mother who always
encouraged me to continue to strive for new heights. To my siblings, Ndoma,
Chigbundu, Maduabuchi, and Ahuru, I say thank you for your words of encouragement.
Equally important are my associates at the office. You listened whenever I
solicited your input during this journey. Additionally, I appreciated your interest in my
research topic and periodic inquiries on the progress. I would like to thank the following
Northcentral University’s faculty members: Dr. Bari Courts, Dr. Mary Beth Klinger, Dr.
John Hannnon, Dr. Ana Machuca, Dr. Linda Leatherbury, Dr. Alfred Greenfield, Dr. Bob
Levsseur, Dr. Anastasis Petrou, Dr. Susan Hebert, Dr. Shakil Akhtar, Dr. J. Dickinson,
Dr. Heather Miller, Dr. Kirby Scheer, and Dr. Diane Stottlemyer for your guidance and
input. A big thank you goes out to my Chair, Dr. Kim Edwards, and my committee
members for this dissertation, Dr. Julia Watkins, and Dr. Joseph Oloyede. I appreciated
your timely feedback and encouragement. Finally, my heartfelt thanks go out to the
internal auditors in the State of Texas who participated in this study. I sincerely
appreciate your time; your input in this study contributed to this significant milestone.
vi
Table of Contents
Chapter 1: Introduction ........................................................................................................1
Background ....................................................................................................................3 Statement of the Problem ...............................................................................................5
Purpose of the Study ......................................................................................................6 Theoretical Framework ..................................................................................................7 Research Questions ......................................................................................................11 Nature of the Study ......................................................................................................11 Significance of the Study .............................................................................................15
Definition of Key Terms ..............................................................................................16 Summary ......................................................................................................................19
Chapter 2: Literature Review .............................................................................................21
Documentation .............................................................................................................22 How Business Continuity Planning Applies to the Government .................................23 Reasons for Business Continuity Planning ..................................................................26
Internal Audit Function ................................................................................................37 Role of Internal Auditor ...............................................................................................43
The Government and Readiness ..................................................................................47 Historical Legislative Perspectives ..............................................................................53 Organizations and Business Continuity Planning ........................................................55
Mitigating a Disaster ....................................................................................................57 Possible Impact of a Disaster .......................................................................................59
Preparing for a Disaster ...............................................................................................63
Responding to a Disaster .............................................................................................65
Summary ......................................................................................................................67
Chapter 3: Research Method ..............................................................................................69
Research Methods and Design .....................................................................................72 Population ....................................................................................................................75
Sample..........................................................................................................................75 Materials/Instruments ..................................................................................................76 Data Collection, Processing, and Analysis ..................................................................77 Assumptions .................................................................................................................80 Limitations ...................................................................................................................80
Delimitations ................................................................................................................81
Ethical Assurances .......................................................................................................82
Summary ......................................................................................................................84
Chapter 4: Findings ............................................................................................................86
Results ..........................................................................................................................87 Evaluation of Findings ...............................................................................................102 Summary ....................................................................................................................109
vii
Chapter 5: Implications, Recommendations, and Conclusions .......................................113
Implications................................................................................................................117 Recommendation .......................................................................................................124 Conclusions ................................................................................................................132
References ........................................................................................................................136
Appendices .......................................................................................................................160
Appendix A: Recruitment Letter - Telephone Script .......................................................161
Appendix B: Recruitment Letter - Email Script ..............................................................162
Appendix C: IRB Approval .............................................................................................163
Appendix D: Informed Consent Form .............................................................................164
Appendix E: Interview Guide .........................................................................................166
Appendix F: Interview Questions ....................................................................................167
viii
List of Tables
Table 1 Themes for Research Question .............................................................................88
Table 2 Significant negative impact ..................................................................................91
Table 3 The obstacles that get in the way of dealing with disruptions successfully .........94
Table 4 The reason for the internal auditor to play major roles in business continuity
planning..............................................................................................................................97
Table 5 The areas the internal auditor should be excluded ................................................99
Table 6 Independence of the internal auditor ..................................................................102
1
Chapter 1: Introduction
Business Continuity Planning, one of the most common topics in business circles,
high-profile meetings, and presentations today, continues to be a major issue, especially
in the government sector. More than ever, society expects the government to be genuine
and highly reputable, especially when managing disasters or any other crisis (Koronis &
Ponis, 2012). The expectation is that this trend will intensify as the political and business
environment continues to change considerably. When a crisis is not properly mitigated,
there could be a temporary disconnection with the public or other users of services or
even permanent disruption of business relations (Koronis & Ponis, 2012). The public
expectations have caused some regulatory agency personnel to begin thinking seriously
about business continuity planning (Jones, 2011).
For example, in May 2011, a tornado ripped through the City of Joplin, Missouri,
and killed 158 people, wounded more than 1,000, and damaged about 8,000 buildings.
According to Busch and Givens (2013), government has always emphasized the
importance of preparing for disruptions. When a disaster occurs, the purpose of business
continuity planning is to ensure critical functions can operate during and after a disaster
or other contingency, and then minimize recovery time to reach normal operations
(Carrington, 2010). Critical functions may require for the government to include
budgetary data, policy and regulatory data, human resource management data, and
acquisition and planning data (Office of Management & Budget, 2011). Governments
oftentimes worry about continuity as they are under pressure to keep up with the citizens’
expectations for optimum services. Additionally, globalization and technological
advancements have changed how governments do business (Izumi & Shaw, 2015; Nasim
2
& Sushil, 2010). For example, since the enactment of the E-government Act by the
United States Congress in 2002, government agencies in the United States are steadily
taking advantage of e-services. As a result, governments have become more transparent
and accountable to the public. Additionally, government services have become more
accessible, more efficient, and there is an increased opportunity for the citizens to
participate in government. Transactions can be completed online, which may include
paying for taxes online, renewing licenses, or even registering to vote. Online presence
also provides an opportunity to explore different ways to generating revenue, not only
targeting citizens of the United States but also people worldwide (Baird, Zelin, & Booker,
2012). According to Melnik (2015), there has been an increase in the number of cyber-
attacks against both United States government agencies and private organizations. For
example, cyber-attacks have increased by 35% from 2010 to 2013, specifically, 34,048 to
46,160. A government agency has to create a plan to be followed should an emergency
arise (Hall, Skipper, Hazen, & Sawalha, 2012). A well-executed plan minimizes the
impact of disruption and ensures the quick resumption of operations. This plan also
requires the assessment of risk and the implementation of risk management.
The internal auditor helps the government achieve its objectives of serving the
public by evaluating and improving the effectiveness of risk management. The internal
auditor reports to the oversight board or a designated committee and is in a position to
evaluate management’s understanding of risks affecting the organization and the potential
impact of any loss (Schneider, Sheikh, & Simione, 2012). The internal auditor also
assures the board of directors or its designated committee that management of the
organization can effectively mitigate any business continuity risks to acceptable levels
3
(Stefaniak, Houston, & Cornell, 2012). Additionally, in situations where management
has decided to assume the risk of undesirable business continuity risk, the internal auditor
notifies the board and also ensures a decision has been adequately documented (García,
Barbadillo, & Pérez, 2012).
Background
When a disaster occurs, it affects everyone including the government, businesses,
and families. The phrase “business continuity planning” is widely used in business or
government. The focus of a business continuity plan is to mitigate potential loss through
the identification, prioritization, and safeguarding of critical assets of the business, not
just information technology (Hoong & Marthandan, 2014). Good continuity plans
include providing an alternative path in support of critical business processes in the event
of an emergency, disaster, or other disruption (Carrington, 2010). The roles of the
government include protecting its people physically or economically, including, among
others, providing welfare, building roads, protecting the border, and funding education.
As a result, proper planning is required to ensure mitigation of losses or elimination of
the impact of disasters (FEMA, 2015; McGuire & Schneck, 2010). For example, the
American Bankers Association and Banking Administrations are expecting their
members to implement acceptable business continuity practices to ensure adequate
protection of the public interest (Koronis & Ponis, 2012). But historically, governments
have not stressed enough about resilience as a required quality for communities. But to
stress the importance of preparedness, the federal, state, and local governments have
instituted laws, statutes, ordinances, and guidance which may or may not be complied
with (Haddow, Bullock, & Coppola, 2011).
4
The United States government collects taxes from its residents on income
generated anywhere in the world (Hickman, 2012). The government sector would rely on
business continuity planning to mitigate the impact of any disruption that would affect its
ability to collect taxes. The government uses taxes collected to fund these projects (Reid,
Waring, Enriquez, & Shivdas, 2012). If the government was unable to process taxes
owing to the lack of contingency planning this would be considered an emergency.
Preparedness is required to mitigate the effect of disasters affecting the government’s
system such as tax database (DHS, 2008). Any disruption affecting the government also
impacts the public (Shughart, 2011). The management of the government agency would
be expected to utilize the right resources, including personnel, to ensure proper
implementation of business continuity planning. Implementation of business continuity
planning requires an adept knowledge of potential risks and its possible impacts on the
government (Glendon, 2013). When proper skills and knowledge are not used to ensure
continuity of business, there is the risk of unsuccessful response to a disaster, and
potentially significant losses (Kusumasari, Alam, & Siddiqui, 2010; Haque et al., 2012).
Although there have been advancements in the government sector in mitigating
disruptions, recurring errors continue to exist in the process (DHS, 2011; Faith, Jackson,
& Willis, 2011; Oh, 2012; Renaud, 2012). Internal audit as an organizational function
thrives on independence. As a result, the internal auditor understands the essence of
providing unbiased recommendations to management and those charged with governance
or oversight. Although internal auditors are not allowed to participate in decision-making
for an entity, owing to their independence, nothing precludes them from providing
proactive, risk-based recommendations (Wines, 2012; Zerni, 2012).
5
Statement of the Problem
A good plan minimizes the impact of disruption and ensures the quick resumption
of operations. But without the involvement of an independent person who understands
risk evaluation management of a government agency could assume undesirable business
continuity risks. An internal auditor is an independent person who understands risk
evaluation. The Auditors report directly to those charged with governance (García et al.,
2012). Sufficient literature does not exist on the perceived roles of the government
internal auditor in business continuity planning.
Governments are oftentimes ill-prepared to handle disasters owing to a lack of
adequate resources, other competing issues, and proper preparation for catastrophic
events (Deverell, 2012). Even the Nationwide Plan Review conducted by the Department
of Homeland Security determined that only 10% of business continuity plans are
adequate to mitigate the effect of disasters (DHS, 2006). The lack of adequate
preparation could pose a significant challenge to the government should an event occur
(DHS, 2011e). Additionally, catastrophic events could result in unnecessary distress,
harm, and affect the public’s perception of the government (Kusumasari et al., 2010;
Shughart, 2011). These shortcomings are usually because of a lack of planning, which
may include proper identification of risks, impact analysis, consideration of response
alternatives, and testing and maintenance (Coles & Zhuang, 2011; Kusumasari et al.,
2010). Consequently, the problem addressed by this study was the lack of the use and the
limited understanding of the perceived roles of the internal auditor in business continuity
planning in the government sector. Governments oftentimes worry about continuity as
they strive to keep up with the citizens’ expectations for optimum services. Potential
6
risks to the government include the loss of mission critical data, displacement of workers,
and unavailability of facilities owing to catastrophic events (Gourio, 2012; McEntire,
2012; Raman, Dorasamy, Muthaiyah, Kaliannan, & Muthuveloo, 2011).
Purpose of the Study
This purpose of this qualitative case study was to explore the perceived roles of
the internal auditor in business continuity planning within the government sector.
Information systems experts and business consultants would agree that it is almost
impossible for a government sector to survive when critical systems are unavailable
owing to a disaster (Chandra, Williams, & Tang, 2013). In essence, the availability of
these critical systems is quintessential in trying to assess a government sector’s business
risk, which is the likelihood of the ability to achieve its objectives when a disaster strikes.
The focus of this case study was internal auditors in the governmental sector from the
State of Texas in the United States. Data sources for this study included semi-structured
interviews and open-ended questionnaires. To ensure credibility, the people selected
were a representative sample of internal auditors affected by the topic under study. Prior
to conducting interviews, the first phase of the study comprised using an interview guide
(Appendix E) developed by the researcher as a guide to avoid any appearance of
incompleteness and inconsistency. The second phase involved sending questionnaires to
the internal auditors at various State of Texas agencies. Face-to-face or telephone
interviews were conducted with the participants. As fieldwork unfolded, no additional
samples were needed due to the depth of discussions with existing interviewees. The
individuals interviewed in each participating state agency had the opportunity to respond
in their own words to express their personal perspectives about the types and possible
7
impacts of service disruptions, perceived readiness, and obstacles in dealing with
disruptions successfully, and what could help an organization mitigate the effects of
service disruptions. The results of this case study could be useful to the State of Texas
agencies and internal auditors as they continue to protect the interests of the public. With
most processing requiring access to increasingly integrated applications and databases,
when the system is down, there is no opportunity to do any meaningful work. The
essential nature of information and technology will continue to increase in the future.
Theoretical Framework
The focus of this study was directed toward exploring the roles of the internal
auditor in business continuity planning in the government sector. Due to the nature of the
identified research problem and purpose, an interpretive approach was determined to be
the best theoretical framework. One basic assumption of the interpretive framework is
that knowledge is gained or at least filtered through training and oftentimes reinforced by
scholarly articles, books, and advisors (Shank, 2006). Additionally, the interpretive
framework acknowledges the intimate relationship between the researcher and the topic
under study, and the situational constraints that shape the process (Shank, 2006). An
interpretive framework, unlike positive, does not predefine dependent and independent
variables and is not designed to test hypotheses. Rather, the focus is to produce an
understanding of the phenomenon (Shank, 2006). The focus of this study is not to
predefine dependent and independent variables or to test hypotheses, but rather to build
an understanding related to the perceived roles of the internal auditor in business
continuity planning in the government sector.
8
Interpretation plays a major role in qualitative research. Interpretation involves
answering the why questions, attaching significance to particular results, explaining
findings, and putting patterns into analytical frameworks. To assure correct
interpretation, there must be solid description, which is called thick description (Shank,
2006). Correctly conducted qualitative research presents detail, context, emotion, and
evokes self-feelings. During interviews, it is easy to interpret incorrectly. For example, a
part of business continuity planning is the risk assessment process (Lindell, Prater, &
Perry, 2007). During risk assessment, it is easy to misinterpret a threat and probability of
impact (Kent, 2011). Also, the lack of pure description and correct interpretation could
affect mitigation approaches used by management of the entity including the estimated
financial impact (Lindell et al., 2007). Additionally, management of the governmental
entity considers different alternatives during the planning stages. Since there is no
universal way of planning for mitigation of disaster or disruption, each approach is
subject to different interpretations. However, consideration is given to different types of
disasters and disruptions and how to mitigate their effects (Haddow et al., 2011).
Another area that is subject to interpretation is the unexpected outcome of an
event (Resnick, 1987). An event could be so unique that uncertainty exists as to the
approach to be used in responding. Sometimes responders might and would rely on past
experiences. But time is of the essence when a disaster occurs; therefore, responders
have limited time to develop strategies and no time to assess options (Patterson, Weil, &
Patel, 2010). Oftentimes, interpretations of the roles of the internal auditor in business
continuity planning might differ because of the background of the researcher, methods
used, or objective of the research (Shank, 2006). As a result, objectivity is very
9
important in qualitative research. One example of thick description utilized in this
proposed study was that of wink. During interviews, the researcher paid close attention to
wink, since each description detail presents a different level of interpretation (Shank,
2006). Additionally, the researcher took into account biases and predispositions during
both the fieldwork and analysis to get to the true essence of the phenomenon under study
(Converse, 2012; Dowling & Cooney, 2012).
The researcher’s perspective must be made explicit. Any research strategy
ultimately needs credibility to be useful. No credible research strategy advocates biased
distortion of data to serve the researcher’s personal interests and prejudices (Klein, 2012).
In this study, it was important to adopt a stance of neutrality. In addition, it was ill
advised to set out to prove a particular perspective or manipulate data to arrive at
predisposed “truths.”
Although the basic assumption of an interpretive framework lies in the view that
there are multiple truths, its approach is more about understanding, which is a primary
goal of qualitative research. Such truths could come from culture, belief, media, and
false ideologies (Shank, 2006). Such shared belief is considered intersubjectivity (Shank,
2006). This study reflected another interpretive framework related to critical awareness.
The idea was not to show weaknesses only but to outline different ways of making things
better. For example, governments implement business continuity plans to ensure
mitigation of the effects of any disruptive events, and thereby protect the assets of the
public.
In this study, the researcher conducted interviews and identified some weaknesses
related to business continuity planning. The participants reflected different ideologies
10
about the roles of the internal auditor in business continuity planning in the government
sector. Such ideologies could be learned or just beliefs (Shank, 2006). Oftentimes, such
ideologies could work against a person’s or government entity’s self-interest (Shank,
2006). For example, a person might believe that the only way to mitigate the impact of
service disruptions is through daily back-ups of data, which are kept in the establishment
or within close proximity and with the oversight of the internal auditor. However, such
ideology could be self-destructive when a disaster occurs. In essence, business continuity
planning might encompass much more than securing the entity’s data (Klein, 2012).
Other studies related to the subject under study. There was a study on the role
of the public sector asset manager in responding to climate change (Berenfeld, 2007).
The study discussed the need for public asset managers to mitigate and prepare for future
events (Warren, 2010). Another study discussed about business continuity management
in local governments. It emphasized that disruptions to the services could cause a
significant negative impact on the community and could prevent councils from meeting
its obligations (Pearson, 2010).
Another study was an assessment exploration of strategic business continuity
planning methods in Michigan small businesses (Lasecki, 2009). Another study
discussed business continuity management and how to ensure continuity of business by
focusing on the critical business processes (Smit, 2005). A study was conducted on the
cyclical approach to business continuity planning (Botha & von Solms, 2004). The study
discussed the limited business continuity planning by small and medium sized businesses
on account of the lack of resources. There was a study on transitioning from business
continuity to mission continuity (Mekdeci, 2011). That study focused on protecting
11
educational technology from potential compromise from a variety of threats including
natural disasters, human created risk, and environment dangers.
To recover from any disruption or disaster, a governmental agency needs to
design business continuity planning effectively (Allen, 2008). Literature concentrating
on the development of a business continuity plan failed to identify the roles of the
internal auditor in the identification of critical business processes; risk assessment and
defined threats; vulnerability; probability; impact analysis; disaster levels and recovery
strategy; implementation; testing; monitoring; and maintenance. Internal auditors of
government entities conduct periodic risk assessments and perform audit plans prior to
carrying out audit activities. To perform these assessments, they must understand every
aspect of the entity and critical nature of each unit. Since business continuity planning
also involves conducting an agency-wide risk assessment, it is important to determine the
roles of the internal auditor to ensure adequate protection of critical assets of the
governmental entity (Dickins & Daughterty, 2012).
Research Questions
Since the purpose of this qualitative single-case study was to understand the use
and the perceived roles of the internal auditor in business continuity planning within the
government sector, the research question was designed to arrive at this understanding:
RQ1. What are the perceived use and the roles of the internal auditor in business
continuity planning in the government sector?
Nature of the Study
The focus of business continuity planning is to ensure total survival, especially in
the governmental sector. Ineffective implementation and response to a disaster could
12
pose the risk of significant losses and negative impact on the government and ultimately
to the public. When a disaster occurs, the job of the government sector is to ensure its
functions can operate during and after a disaster or other contingency, and then minimize
recovery time to reach normal operations, and thereby protect the public (Moeller, 2008).
To mitigate the risk of substandard business continuity planning the right resources
should be utilized. Although no business continuity plan is perfect, the internal auditor,
an independent function, understands risk affecting an organization and is in a position to
report to management and those charged with governance about issues affecting the
organization (McGuire & Schneck, 2010).
This qualitative research focused on understanding the perceived roles of the
internal auditor in business continuity planning within the government sector. This case
study used purposive sampling to ensure the identification and selection of individuals or
groups of individuals with the proper knowledge and experience related to the
phenomenon under study. In addition, participants were expected to be available and
fully participate in the study. They also were expected to be able to convey experiences
or opinions in a coherent manner. The overall objective was to maximize efficiency and
ensure optimum validity (Suri, 2011; Patton, 2002; Yin, 2009). Accordingly, Jones
(2010) exhibited the same rationale during his research on the leadership of government
during an emergency.
Furthermore, the focus of this research strategy is to enhance the consistency and
accuracy of the data gathered, by reducing the unpredictability of responses obtained due
to the individual understanding of data gathering tools and information (Yin, 2009).
Additionally, qualitative research methodology has become increasingly popular within
13
the field of business continuity research (Rodriguez, Quarantelli, & Dynes, 2007;
Stallings, 2007). Also, this research design methodology is widely used within the public
policy and administration field. This methodology has been used when a study requires
an in-depth understanding of a phenomenon (Haddow et al., 2011). Finally, a host of the
significant studies and pertinent findings within the business continuity and crisis
management field have used qualitative research methodologies (Munro, 2011).
The primary benefit of employing the qualitative research design methodology
was the impartiality in the gathering of data by the researcher by reviewing the pertinent
documents first prior to interviewing the participants. This review ensured the
elimination of any form of participant bias when responding to the researcher’s questions.
Additionally, a qualitative case study provided an opportunity to gain a deeper
understanding of the subject under study (Munro, 2011).
Data collection consisted of utilizing several sources to ensure adequate
understanding of the roles of the internal auditor in business continuity planning in the
governmental sector. The first phase included reviewing a sample of business continuity
plans for different governmental agencies in the State of Texas to ensure the presence of
a business impact analysis, security risk assessment, recovery strategy, implementation
testing, and maintenance program, and disaster recovery plan (Dickins & Reisch, 2012;
Jarvelainen, 2012). Finally, there were interviews with internal auditors in different
governmental agencies in the State of Texas to gain an insight into their perceived roles
in business continuity planning within their respective state agencies.
Texas Government Code, Chapter 2102, Section 2102.004 requires that each state
agency that has an annual operating budget of $10 million; or has more than 100
14
employees; or receives and processes more than $10 million in cash in a fiscal year
establish an internal audit function. A total of 253 state agencies were identified that met
this requirement (Texas State Auditor’s Office, 2015). Each state agency’s internal
auditing function was expected to have an internal auditor. Additionally, the internal
auditor was required to prepare an internal audit plan by employing risk assessment
methodologies that identify individual audits to be performed during each year. Audits
included the agency’s major system and controls such as accounting systems and
controls, administrative systems and controls, and electronic data processing systems and
controls (Texas Internal Auditing Act, 2003).
The 80th Texas State Legislature, Senate Bill 908, requires all state agencies and
universities to have a business continuity plan or continuity of operations plan under the
guidance of the Texas State Office of Risk Management (Texas State Legislature, 2007).
The objectives were to ensure a state agency can perform its essential function under all
conditions, reducing the loss of life and minimizing property damage and loss, executing
a successful order of succession with accompanying authorities in the event of disruption,
and ensuring there are facilities from where the agency can perform essential functions,
and protecting personnel, facilities, equipment, records, and other assets critical to the
performance of essential functions in the event of a disruption.
The essential functions that must continue and restored quickly, as identified by
SORM include providing and/or assisting in the provision of basic needs which include
water, power, healthcare, communications, transportation services, sanitation services,
environment protection, commerce, and financial services. Emergency services include
providing and/or assisting local and tribal governments in providing critical emergency
15
services, including emergency management, police, fire, ambulance, medical, search and
rescue, hazmat, shelters, emergency food services, and recovery operations (Texas State
Office of Risk Management, 2016)
Significance of the Study
Business continuity planning should ensure the consideration of the potential risks
and the probability of occurrence. There must be the identification of critical business
processes, risk assessment and definition of threats, determination of vulnerabilities,
probability, impact, disaster levels and recovery, implementation and maintenance
strategies. In essence, there should be reasonable assurance of sufficient plan to mitigate
unwanted risks within certain tolerable limits (Gruiescu, Ioanăş, & Morega, 2010).
However, business continuity plans may not consider the necessary attributes required
when the proper expertise is not utilized (Erickson, 2006; Henstra, 2010).
The threat of catastrophic events needs to be understood and properly
communicated to those charged with the oversight of the government agency as such
events could have significant negative effects on the government (Law & Robson, 2014).
Service disruptions could jeopardize the government entity’s critical products and
financial security (Goudsmit, 2012) when the business continuity plan is not planned
properly. Recently, there have been instances of disasters that resulted in significant
economic losses. Economic losses arising from disasters between 2001 and 2010
approximated over $1 trillion. This amount doubled the total amount of losses incurred
between 1981 and 1990 (Kunreuther & Michel-Kerjan, 2011). As such, management and
the oversight body need to rely on an independent function to provide insight into the
16
nature of risks affecting the government agency, the likelihood of the risks and the risks,
and the level of preparedness (Stewart & Subramaniam, 2010).
The internal auditor who is charged with auditing all of the activities should
understand the functions of the governmental entity and is in a position to provide
independent information regarding risks and the effectiveness of the business continuity
plans in a non-cost prohibitive way (Dickey, Schwagel, & White, 2006). Even in the
business environment today, internal auditing is considered a significant part of an
organization’s internal control structure. To reinforce the critical nature of this function,
Section 303a of the New York Stock Exchange’s Corporate Governance Listing
Standards (2013) specifically requires companies to have an internal audit function.
Therefore, it is important to ensure management understands internal auditing is an
essential part of the organization and is positioned to offer support in risk management
(Dickey et al., 2006). The estimated cost of the BP oil spill was $6.6 billion in the United
States and $1.5 billion in the Caribbean (Kunreuther & Michel-Kerjan, 2011). These
uncertainties can be mitigated by properly implementing preventive mechanisms and
control processes utilizing the right expertise to address threats and vulnerabilities (Geale,
2012). Also, government agencies are not immune to disasters; therefore, proper
business continuity planning is required.
Definition of Key Terms
Audit committee. An operating body of the governing body responsible for
overseeing financial reporting and providing an ongoing link between the governing body
and the independent auditor, separate from management (Gauthier, 2007).
17
Business continuity management. Business continuity management is a process
that assures the identification of potential impact of risks that threaten an organization,
provide a system for forming resilience and means for an effective and efficient reaction
to these threats, and to ensure the eventual preservation and interest of its key
stakeholders, reputation, brand and value-creating actions (Calderon, 2003).
Business continuity risk. A business continuity risk is a probability that the
entity will continue to exist after a significant event (Calderon, 2003).
Business impact assessment. A business impact assessment is the evaluation of
the entity’s requirements based on the importance to business functions (Berenfeld, 2007)
Business continuity. Business continuity is designed to allow an organization to
examine its processes, so it understands how things work—where the risk points are and
how to start establishing mitigation alternatives and approaches (Garcia, 2008).
Critical business processes. Processes that must be restored immediately after a
disruption of service occurs (Calderon, 2003).
Disaster. An event that could result in a loss (Bayrak, 2009).
Disaster recovery. Disaster recovery provides for the restoration of critical
facilities and IT services such as hardware, software, and telecommunications following a
significant event (Bayrak, 2009; Parker, 2011).
Internal auditing. Internal auditing has been defined as an independent,
objective assurance and consulting activity designed to add value and improve an
organization’s operations. It helps an organization achieve its objectives by bringing a
systematic, disciplined approach to evaluate and improve the effectiveness of risk
18
management control and governance processes (Burnaby, Hass, & Abdolmohammadi,
2009).
Independent. Impartial and unbiased in discharging duties. The internal auditor
must have an impartial, unbiased attitude in discharging his or her duties (Sinason, 2011).
Internal control. Internal control has been defined as a mechanism implemented
by management to assure “the accomplishment of the organization’s objectives” (Tysiac,
2012, p. 24).
Low impact disaster. Temporary, little to no damage or loss, easily remedied,
may require no organizational response, such as power loss due to thunderstorm or failure
to make a backup of data because a key person was out of the office (Bayrak, 2009).
Major impact disaster. An event that is long-term, causing destruction or loss of
data center, office space, warehouse, or other, such as the first World Trade Center attack
in 1993, or a major attack against one or more e-commerce sites such as the February
2000 distributed denial-of-service attack on eBay or Hurricane Sandy of October 2012.
Medium impact disaster. An event causing possibly temporary, minor damage
or loss that will require some remediation, such as power loss due to an accident that
knocked down a pole carrying electric lines, or a computer virus spreading rapidly
through the organization (Bayrak, 2009).
Mitigate. An action to ensure an occurrence is less severe or harmful (Berenfeld,
2007). Organizations develop and implement business continuity plans to mitigate
service disruptions.
19
Risk assessment. Risk Assessment is the quantitative or qualitative
determination value of risk associated with specific situations and documented threats
(Pinta, 2011).
Risk mitigation. Risk mitigation is developing “appropriate, cost-effective
controls that work to reduce potential threats or reduce the impact of those threats should
they occur” (Mekdeci, 2011).
Stakeholders. Individuals, groups, or organizations affected by an organization’s
actions, especially whenever there is a disruption of service.
Threats. Threats are potential events that could cause technology or facilities to
be unavailable or damaged (Mekdeci, 2011).
Vulnerability. Susceptible to a risk or harm. As a part of business continuity
planning, organizations assess vulnerabilities (Mekdeci, 2011).
Summary
When a disaster occurs, the purpose of business continuity planning is to ensure
critical functions can operate during and after a disaster or other contingency, and then
minimize recovery time to reach normal operations (Carrington, 2010). Governments are
oftentimes ill-prepared to handle disasters owing to a lack of adequate resources, other
competing issues, and proper preparation for catastrophic events (Deverell, 2012).
Therefore, they apply their resources toward more critical issues. But government
agency has to create a plan to be followed should an emergency arise (Hall, Skipper,
Hazen, & Sawalha, 2012). This minimizes the impact of disruption and ensures the quick
resumption of operations. A well-executed plan minimizes the impact of disruption and
ensures the quick resumption of operations. This plan also requires the assessment of
20
risk and the implementation of risk management. The internal auditor helps the
government achieve its objectives of serving the public by evaluating and improving the
effectiveness of risk management. Consequently, the problem to be addressed by this
study was the lack of the use and the limited understanding of the perceived roles of the
internal auditor in business continuity planning in the government sector. This
qualitative research focused on understanding the perceived roles of the internal auditor
in business continuity planning within the government sector. This case study used
purposive sampling to ensure the identification and selection of individuals or groups of
individuals with the proper knowledge and experience related to the phenomenon under
study. The researcher used semi-structured interviews and open-ended questionnaires for
data collection.
21
Chapter 2: Literature Review
This study explored the roles of the internal auditor in business continuity
planning within the government sector. When an organization experiences a disruption
of service because of a disaster or other unexpected incidents, the responsibility of an
organization is to ensure critical functions will continue to operate during or after the
incident (Cascardo, 2013). Business continuity plans are the measures an organization
has in place to ensure the continuance of business if there is a disruption of normal
operation (Lindström, 2012). The primary objective is to ensure mission-critical systems
of the entity, such as the government, continue to function at an acceptable level
regardless of a disaster or disruption (Randeree, Mahal, & Narwani, 2012). Governments
oftentimes worry about continuity as they are under pressure to keep up with the citizens’
expectations for optimum services. Additionally, globalization and technological
advancements have changed how governments do business (Nasim & Sushil, 2010). A
government agency has to create a plan to be followed should an emergency arise (Hall et
al., 2012). Thus, an implemented and complete plan minimizes the impact of disruption
and ensures the quick resumption of operations.
For example, the United States collects taxes from its residents on income
generated anywhere in the world (Hickman, 2012). The government sector would rely on
business continuity planning to mitigate the impact of any disruption that would affect its
ability to collect taxes. The management of the government agency would be expected to
utilize the right resources to ensure proper implementation of the business continuity
plan. Implementation of business continuity planning requires an adept knowledge of
potential risks and their possible impact on the government (Glendon, 2013). For
22
example, Malaysia had never experienced tsunami until its occurrence 2006, and because
of a lack of proper planning, experience, and expertise, the government was not prepared
to mitigate the disruption arising from that event (Raman et al., 2011). Potential risks to
the government include the loss of mission critical data, displacement of workers, and
unavailability of facilities because of catastrophic events (Gourio, 2012). The internal
auditor helps the government achieve its objectives of serving the public by evaluating
and improving the effectiveness of risk management. The government internal auditor
could assist in risk evaluation during the implementation of business continuity planning.
Historically, government internal auditors roles have been in the areas of audit
performance, testing the integrity and reliability of the information provided to elected
officials or public, participating in measuring performance by reviewing the
reasonableness of performance targets and making recommendations to management and
elected officials, and assisting elected officials and management in an advisory capacity
(Epstein, 2010). Some of the issues affecting governments today are adapting to changes
related to information technology (Marsh, Fischer, & Montondon, 2013). But, there has
been little or no attention given to the role of the internal auditor in business continuity
planning in the government sector. Ironically, information technology is a major part of
the business continuity planning (Aikins, 2011).
Documentation
The literature review was conducted by using several online library databases,
which included ProQuest ABI/INFORM Global, Roadrunner Search, and EBSCOhost,
for peer-reviewed, academic articles with key terms of business continuity planning,
internal auditing, and government sector. Different variations of these terms used to
23
search databases were disaster recovery, risk management, independent, internal control,
mitigation, risk assessment, threats, vulnerability, crisis, and stakeholders. This
document includes 203 peer-reviewed journal articles published within the last five years
and properly referenced and cited.
The strategy used to gather appropriate literature included research on information
pertinent to business continuity planning and roles of the internal auditor within the
government sector in the United States. The literature search involved looking for
resources in different journals, books, dissertations, magazines, newspapers conference
papers and proceedings, trade journals, and other pertinent journals available in
Northcentral University’s online database. Each source was reviewed and evaluated to
determine its applicability to the subject under study.
How Business Continuity Planning Applies to the Government
Governments serve the public and as such should be concerned about the threats
to the continuity of their operations. Just like other organizations, they face different
types of risks on a daily basis, which includes failure of established internal controls,
catastrophic events, and noncompliance with regulations (Nor Azimah, 2013).
Emergency conditions can arise at any time; therefore, it is the expectation of the public
that the government protects its assets to ensure continuity of operations. Government
leaders need to identify the risks and institute a plan to ensure successful recovery should
an event occur (Smith, 2013). As a result, there is a need for the design and
implementation of a business continuity plan that provides reasonable assurance of
mitigating any emergency (Ditch, 2014).
24
Although it is almost impossible to predict how long or the severity of a potential
disaster, a risk assessment can be used to project the likelihood of a threat such as
earthquakes, tornadoes, pandemic, terrorist acts, and other disruptive events (Adini, Laor,
Cohen, & Israeli, 2012). A properly conducted risk assessment can also sustain safety,
security, and improve the knowledge should an emergency occur; and thereby enhance
the resilience of the organizational systems (Johnsen & Veen, 2013). Business continuity
planning needs to continue to evolve and expand as it is more than daily backups and
facilities for housing staff; it involves the organization as a whole. Even the U.S. Federal
Reserve Board, the Office of the Comptroller of the Currency, and the Securities and
Exchange Commission identified the need for a business continuity plan and published an
interagency paper to the financial services industry. Their goal was to ensure timely
response and adequate protection of assets should a catastrophic event occur. The
specific objective was to ensure swift recovery and appropriate continuation of critical
services following a disaster or any other catastrophic event (Law & Robson, 2014).
The Securities and Exchange Commission firmly believes it is important to have
an alternative plan to ensure continuity of operations. As a result, in 2004, the Securities
and Exchange Commission enacted rules requiring the National Association of Securities
Dealers and New York Stock Exchange members to develop and implement business
continuity plans (Law & Robson, 2014). Specifically, the Securities and Exchange
Commission requires members of National Association of Securities Dealers and New
York Stock Exchange to develop procedures related to major service interruptions. The
concept is that among securities professionals this requirement will streamline regulation
and ultimately reduce the cost to members (Cereola & Cereola, 2011).
25
In response to the accounting scandal involving certain high profile organizations,
President George Bush signed the Sarbanes-Oxley Act of 2002 (Scott & Nganje, 2011).
Additionally, because of recent fraudulent activities in different organizations,
management and stakeholders are concerned about the increasing risk related to business
continuity (Randeree et al., 2012). For example, corporate fraud has caused the collapse
of one of the major auditing organizations (Beets, 2011). Another example was the
indictment of Enron’s CEO and conviction of other members of management who
violated ethics, trust, and integrity tied to the abuse of power (Soltani, 2014). Although
Sarbanes-Oxley did not specifically require the implementation of business continuity
plans, such provision was indirectly made in the interpretation of Section 404,
Management Assessment of Internal Control (Cereola & Cereola, 2011). Sarbanes-Oxley
does specifically require member organizations to understand the risks that may have a
significant impact on their financial reporting and as a result, business continuity became
an integral part of the Sarbanes-Oxley Act (Cereola & Cereola, 2011).
The goal of business continuity planning is not to prevent disasters or service
disruptions, but, like an insurance policy, it deals with risk identification and assessment,
and planning for the mitigation of losses from an unfavorable incident (Goldberg, 2013).
Such planning ensures that an organization will be able to respond to a disaster, and
critical business activities will continue to function at an acceptable level (Turulj &
Bajgoric, 2012). Business continuity planning could mitigate losses from disasters when
properly developed and implemented (Turulj & Bajgoric, 2012). To ensure proper
mitigation of losses from disaster, there should be refined methods of understanding
26
risks, which would involve deploying different expertise in the organization to participate
in the risk identification and assessment (Santos, Borges, Canós, & Gomes, 2012).
Business continuity planning and disaster recovery are often used
interchangeably, but their objectives are different. Business continuity planning is
broader in scope since it encompasses developing, testing, and the continuity of an
organization as a whole, including people, facility, and critical information technology
(Friedman, 2014). Disaster recovery concentrates on developing, testing, and
implementing continuity for critical information technology and business applications
(Friedman, 2014). Business continuity planning tends to be utilized to identify the
resources, threats, and potential impact of threats, as well as ways of mitigating
disruptions affecting the organization as a whole (ISACA, 2012). In essence, to ensure
continuity, critical processes of an organization, including IT, need to be restarted or
recovered within an acceptable time frame. The lack of awareness and understanding of
threats by a segment of the organization could be a hindrance during the formulation of a
business continuity plan (Ojha, Gianiodis, & Manuj, 2013). As a result, it is important
for senior management, IT managers, and operational employees to get involved in the
development of a business continuity plan (Lindström, 2012).
Reasons for Business Continuity Planning
At a minimum, over a billion individuals in different countries worldwide are
periodically exposed to disasters and the frequency of disasters is steadily increasing. For
example, between 1900 and 1909, about 73 disasters occurred, but during the period of
2000 to 2005, there were instances of 2,788 disasters (Pathirage, Seneviratne,
Amaratunga, & Haigh, 2012). According to Chen and Lee (2012), natural disasters occur
27
about 400 times each year and result in over 70,000 deaths and affect more than 230
million people. These worldwide disasters are affecting different organizations.
Disasters can affect any organization, large or small, and at any level of
development (Heller, 2012). In today’s dynamic world, organizations are always looking
for different ways of achieving their goals and ensure continuity of operations (Spremic,
Jakovic, Braje, & Cavlek, 2013). The Internet has steadily been essential to all facets of
the world prompting questions on how to manage and govern it (De Turck, Kiriha, &
Hong, 2012). Notwithstanding, the past 20 years has seen tremendous advancement
toward a technology base that is more universal; therefore, enhancing worldwide
connectivity. Additionally, the number of connections and data exchanges has increased
(Ghezzi et al., 2013). As more catastrophic events occur, organizations and the public as
a whole worry about the continuity of business functions. Additionally, technology has
made the world one interconnected marketplace. Organizations are steadily transitioning
from stand-alone word processing and paper filing to server-based systems (Friedman,
2014). These systems make it easier to access documents remotely and obtain real-time
information. The Internet has steadily become essential to all facets of the world.
Businesses are steadily moving to real-time operations; making connectivity very
important to ensure achievement of an organizations’ objectives (Friedman, 2014).
Advanced technologies are required for mobile computing in the workplace,
enterprise resource planning, virtualization, cloud computing, social networking, and
faster connectivity to ensure a competitive edge (Nicoll & Owens, 2013). Cloud
computing is the method of storing and processing information offsite and it has changed
the way business is conducted in the 21st-century (Tudoran & Ionescu, 2014). From an
28
economic standpoint, cloud computing affords an organization the option of operating
without having to pay for hardware, software, maintenance, and data storage costs and
management. Cloud computing is also considered to be environmentally friendly
because it enhances energy efficiency and has the advantage of scalability (Dudin &
Smetanin, 2011). Owing to the continued technological transformations and
globalization of computer resources, cloud computing offers organizations many ways of
improving productivity; it is estimated that cloud computing has become a $46 billion
business (Aleem & Christopher, 2013). Although cloud computing offers organizations
many ways of improving productivity, some are worried about security issues such as
hacking (Jeya & Kannan, 2014). Cloud computing is the method of storing and
processing information offsite and it has changed the way business is conducted in the
21st century (Nicoll & Owens, 2013). Business continuity plans and critical data stored
in the cloud can be easily accessible through laptops, smartphones, and tablets. However,
this convenience comes with risks. Internet-based attacks have increased significantly,
resulting in severe disruptions in different organizations (Sterbenz et al., 2013).
Disruptions can impact recovery time and accessibility of data if business continuity is
not properly implemented. However, efficiency is achieved when recovery is
accomplished without delay.
The United States has recently had incidents of denial of service attacks aimed at
different business establishments (Campbell, 2013). These incidents were previously
classified as improbable but are currently considered major threats to organizations
(Campbell, 2013). Some are considered criminally motivated and could be initiated
29
internally or externally. As a result, this type of attack should be classified as a business
continuity issue.
There is also an increased use of personal data storage devices such as CD, USB
sticks, and even smartphones. These devices can be infected, therefore, posing
significant risks to organizations. There is also a growing reliance on outsourcing of
services to other entities and ergo, and as a result, there are increased security issues
related to data as well as reputational risks (Jarvelainen, 2012). As a result, it is
important to develop and implement business continuity planning to ensure the protection
of critical infrastructure. There are also constant expectations from the public, customers,
and government that necessitates building resilient infrastructure to ensure continuity of
business functions (Campbell, 2013). To comply with such demands, organizational
leaders should adopt the right technology policies as well as procedures and recovery
alternatives, and ensure they are tested periodically as a component of the business
continuity planning (Heller, 2012). The internal auditor ensures the organization’s
business continuity incorporates mobile devices that support critical functions and usage
of social media. As a result, mobile devices should have scheduled backups, and there
should be training on how they are backed up. The internal auditor should also review
contracts with mobile device vendors to ensure there is a provision for replacement and it
aligns with the recovery time objective.
Over the past four decades, the United States has experienced an increase in
losses arising from natural disasters such as wind, hail, tornadoes, and lightning
(Goudsmit, 2012). According to the U.S. government’s National Climatic Data Center in
North Carolina, it is believed that hurricane damage will increase in the future on account
30
of changes in the atmosphere (Campbell, 2013). Specifically, precipitation will rise as
the atmosphere becomes moister; thereby causing more rainfall and flooding. There are
also political overtures that may impede mitigating against natural disasters. Some
politicians, specifically, the state of North Carolina Republic state legislature, passed in
2012 a law disallowing any plans for flood defense on the potential effects of climate
change until 2016 (Campbell, 2013). Although no other states have implemented such a
law, it is still important to ensure that critical assets are protected.
Although an organization’s leaders can achieve the business’ strategic objectives
through the utilization of proper technologies, they oftentimes introduce new risks that
should be mitigated (Jarvelainen, 2012). Such planning by management provides
reasonable assurance of aligning an organization’s goals with its business continuity,
avoids redundancies, ensures efficiency and effectiveness, and ultimately meets the
expectations of the stakeholders (Jarvelainen, 2012). As a result, there is a need for
constructing strong and flexible infrastructures and specifying business continuity
procedures to ensure restoration of critical business functions within recovery times that
are acceptable for an enterprise (“Four emerging”, 2012).
Historically, some organizational managers have failed to plan appropriately for
disasters because of the lack of ordered priorities or because of the difficulty in
determining the potential cost of a service disruption (Malalgoda, Amaratunga, & Haigh,
2013). Sometimes disasters can be predicted in advance. An example was the New
Orleans’ flooding following Hurricane Katrina. Still, an event shocks many people
whenever it occurs. As a result, many government leaders are mandating certain
industries to implement and document a business continuity plan that is frequently tested
31
(Heller, 2012). For example, in the United States, certain industries such as healthcare,
utilities, and financial services are required to implement and maintain a business
continuity plan. During the World Trade Center attack in 1993, it took Morgan Stanley’s
employees over 4 hours to vacate the building (Law & Robson, 2014). After that
incident, the business continuity plan for the organization had to be revamped to ensure
better mitigation of any future events.
More than ever, society expects the government to be genuine and highly
reputable, especially when managing disasters or any other crisis (Koronis & Ponis,
2012). The expectation is that this trend will intensify as the political and business
environment continues to change considerably. When a crisis is not properly mitigated,
there could be a temporary disconnection with the public or other users of services or
even permanent disruption of business relations (Koronis & Ponis, 2012). The public
expectations have caused some regulatory agency personnel to begin thinking seriously
about business continuity planning (Jones, 2011). For example, the American Bankers
Association and Banking Administrations are expecting their members to implement
acceptable business continuity practices to ensure adequate protection of the public
interest (Koronis & Ponis, 2012).
Preparing and implementing a business continuity plan requires different
expertise to ensure proper response to events (Davison, 2014). Management of disasters
with the right resources, which can include the deployment of the internal auditor for
assessing risks, is important (Zaharia, Dragne, & Tilea, 2014). The identification of the
right resources might also provide a reasonable assurance of continuity of business after a
disaster (Heller, 2012). The internal auditor focuses not only on internal control but
32
overall organizational risks. This scope ensures the identification of critical business
processes; performance of risk assessment and defining threats; determination of
vulnerabilities, probabilities, potential impacts, disaster levels and recovery; and
implementation strategies. Additionally, reasonable assurance is provided in terms of
keeping unwanted risks within certain tolerable limits (Gruiescu et al., 2010).
An organization should have an alternative path in support of critical business
processes in the event of an emergency, disaster, or other disruption (Jan & Lurie, 2012).
When a disaster occurs, the job of management is to ensure business functions can
operate during and after a disaster or other contingency, and minimize recovery time to
reach normal operations (Jan & Lurie, 2012). The focus should be to ensure total
business survival, not just information technology (Hemond & Benoit, 2012). The ability
to recover from an unexpected incident can mean the difference between recovery and
loss of the business entirely (Hemond & Benoit, 2012).
Recently, there have been instances of disasters that resulted in significant
economic losses. Economic losses arising from disasters between 2001 and 2010 were
set at approximately $1.2 trillion (Kunreuther & Michel-Kerjan, 2011). This amount
surpasses the $528 billion between 1981 and 1990 (Kunreuther & Michel-Kerjan, 2011).
For example, the earthquake that struck Japan in 2011 damaged more than 275,000
buildings, 3,559 roads, 77 bridges, and 29 railways and the estimated economic losses
were $210 billion (Farber, 2011). This amount from the Japanese earthquake is
approximately double the amount of economic loss from Hurricane Katrina (Farber,
2011).
33
The tsunami disaster shows how modern societies’ interdependencies make them
susceptible to disasters as damage to networks could affect the delivery of key services
(Farber, 2011). Also, the McLure fire of 2003 was the worst fire in British Columbia in
terms of damages caused and as a result, many businesses incurred significant economic
losses totaling approximately $5.6 billion (Cox & Perry, 2011). Owing to the fire loss,
approximately 200 top businesses decided to close their businesses permanently (Cox &
Perry, 2011). The government, just like other organizations, could be affected
significantly by disasters without notice (De Smit, Lagadec, & Leysen, 2012).
The SARS infection epidemic that occurred between 1996 and 2006 comprised
over 3,000 cases and more than 1,300 deaths (K. Lee, Lan, Wang, Fang, & Shiao, 2014).
Those incidents resulted in a significant customer decline in Chinese eateries in North
America. As a result, some scheduled conventions were canceled, which ultimately
affected several cities and necessitated the intervention of the government (K. Lee et al.,
2014). The terrorist attack that occurred in the London, England in 2005 caused 55
deaths (Ramiah & Graham, 2013). That attack significantly affected the country’s
transportation and telecommunications systems.
Another example of instances of disaster with significant business impact was the
BP Deepwater Horizon spill that occurred in 2010 (Farber, 2011). BP personnel spent
about 3 months trying to stop the flow of oil. Additionally, Hurricane Irene in 2011
caused a significant economic loss due to flooding in the northeast (Farber, 2011). The
estimated cost was $6.6 billion in the United States and $1.5 billion in the Caribbean
(Kunreuther & Michel-Kerjan, 2011). An organization’s leaders can mitigate this type of
uncertainty by implementing preventive mechanisms and control processes to address
34
threats and vulnerabilities (Geale, 2012). Also, government agencies are not immune to
disasters; therefore, proper business continuity planning is required. Such planning
would necessitate gathering the right internal and external resources and properly
deploying them to ensure prevention or mitigation of disasters (Geale, 2012).
Oftentimes senior management and the majority of the members of an entity lack
the awareness and an adequate understanding of the business continuity process
(Niemimaa & Jarvelainen, 2013). These entities include the government, financial
institutions, utilities, and healthcare (Lindström, 2012). As a result of this lack of
awareness and understanding, there is the reluctance to implement a business continuity
plan, and this lack of knowledge could determine whether an entity continues to exist
(Malalgoda et al., 2013).
There were studies in various areas within business continuity planning. These
included the need for public asset managers to mitigate and prepare for future business
continuity planning management in local governments, an exploration on business
continuity planning in Michigan small businesses, how to ensure continuity of business in
general small and medium businesses, and on education technology (Botha & von Solms,
2004; Lasecki, 2009; Mekdeci, 2011; Smit, 2005; Warren, 2010). But none of the studies
addressed the roles of the internal auditor in business continuity planning in the
government sector. To recover from any disruption or disaster, government agencies
need effectively designed business continuity plans (Lindström, 2012).
Management and audit committees need to rely on an independent function such
as the internal auditor to provide information regarding the nature of risks, the likelihood
of the risks, the significance of the risks, and conditions of the organization’s
35
preparedness (Stewart & Subramaniam, 2010). The internal auditor is charged with
auditing all of the activities of an organization and understands the organization and is in
a position to provide assurance to management that the business continuity plan is
effective, key personnel are knowledgeable of the business continuity plan, its execution
is practical, and that it is cost-effective (Dickey et al., 2006). In the business environment
today, internal auditing is considered a significant part of an organization’s internal
control structure. To reinforce the critical nature of this function, Section 303a of the
New York Stock Exchange’s Corporate Governance Listing Standards (2013)
specifically requires companies to have an internal audit function. Therefore, it is
important to ensure management understands internal auditing is an essential part of the
organization and is positioned to offer support in risk management (Dickey et al., 2006).
No entity is immune to the threat of service disruptions. Service disruptions could
jeopardize an entity’s critical products and financial security (Goudsmit, 2012).
Although developing and implementing a business continuity plan involves a significant
financial commitment, the cost of not developing and implementing one could be greater.
An example is the earthquake in Japan that cut off critical pharmaceutical equipment of
the biotechnology company that had facilities in the United States. The high wind from
the earthquake caused significant property damage and disruption of services. A part of
the business continuity plan is the purchase of adequate insurance protection (Goudsmit,
2012).
Business continuity planning involves more than just a plan for information
systems. The first step to be considered in business continuity planning is the business
impact analysis which identifies risks and reveals the financial, human, and reputational
36
impact on the organization (Lindström, 2012; Nicoll & Owens, 2013)). There are
different approaches for performing a business impact analysis. One is the use of a
questionnaire which is circulated to the appropriate individuals in the organization. The
information is obtained, tabulated, and analyzed (Ojha & Gokhale, 2009). The next step
is developing recovery strategies. These are a combination of preventative, detective and
corrective measures. A primary goal would be to develop a strategy that identifies the
best way to recover critical systems in case of interruption. The appropriate strategy
would be the one with a cost for an acceptable recovery time that is also reasonable
compared to the impact and likelihood of occurrence as determined in the business
impact analysis (Goudsmit, 2012; Jarvelainen, 2012).
The next step in business continuity planning involves developing a plan. Based
on the input received from business impact analysis and the recovery strategy chosen by
management, a detailed business continuity plan is developed (Lindström, 2012;
Randeree et al., 2012). The various factors usually considered include pre-disaster
readiness covering incidence response management to address all incidences affecting the
organization, evacuation procedures, procedures for declaring a disaster, procedures for
declaring a disaster, the clear identification of the responsibilities in the plan, and the
identification of the various resources required for recovery and continued operation of
the organization (Jarvelainen, 2012; Sawalha, Anchor, & Meaton, 2012).
The next step in the business continuity planning involves testing the business
continuity plan to determine how well the plan works. The test should address all critical
components and simulate actual primetime processing conditions. There should be
training and exercises to ensure awareness of respective responsibilities. Additionally,
37
there should be detailed documentation of observations, problems, and resolutions. This
documentation serves as important historical information that can facilitate actual
recovery during a real disaster. Business continuity plans should be reviewed and updated
on a scheduled basis to reflect continuing recognition of changing requirements
(Bajgoric, 2014; Randeree et al., 2012).
Internal Audit Function
An internal audit is an independent function within an organization that is
responsible for evaluating the effectiveness of enterprise risk management control
(Burnaby et al., 2009). Stewart and Subramaniam (2010) examined the independence
and objectivity of the internal auditor by reviewing the reporting relationship of the
internal auditor within an organization and the roles the internal auditor plays in
assurance, consulting activities, and risk management. Internal auditors were found to
play an important role in strengthening risk assessment and internal control (Stewart &
Subramaniam, 2010). Additionally, Christopher, Sarens, and Leung (2009) discussed the
importance of the internal auditing function in enhancing corporate governance. The
enactment of the Sarbanes-Oxley Act has made it even more essential for business
managements to rely on the internal auditor during a review of internal control. Internal
auditors provide additional services, which are usually initiated by the board of directors
or audit committee and management to ensure proper accountability (Christopher et al.,
2009).
Internal auditors assume advising responsibilities to ensure the improvement of an
organization’s fundamental process (Badara & Saidin, 2013). They must propose an
audit plan based on risk assessment. Additionally, they help an organization maintain
38
appropriate internal control. Internal auditors are involved in continuous risk assessment
and evaluation to ensure the achievement of organizational goals (Burnaby & Hass,
2011).
The internal control provides reassurance to the users of the reliability of
information presented to the stakeholders (Lenz & Sarens, 2012). The public wants to be
sure the government sector is run very efficiently and effectively. Additionally, external
auditors expect organizations to have a good internal control (Lehman, 2010). The
internal auditors are usually very knowledgeable about the activities of the organization
and could add value during the development and implementation of a business continuity
plan to provide reasonable assurance to the public about the objectivity of the information
presented (Sinason, 2011).
Internal audit and independence. For an internal audit to be effective it must be
independent (Al-Matari, Al-Swidi, & Fadzil, 2014). In essence, the work of the internal
auditor should be free from the influence of the management of an organization. Internal
auditors, especially the heads of the internal audit functions in organizations, usually have
certifications in any of the following: Certified Public Accountant granted by a state
board of public accountancy under standards promulgated by the American Institute of
Certified Public Accountants, Certified Internal Auditor granted by the Institute of
Internal Auditors, or Certified Information Systems Auditor granted by the Information
Systems Audit and Control Association (ISACA). Each of these professional bodies has
different standards with which their licensees must comply. Some of these standards
include undergoing periodic external quality control reviews and maintaining minimum
continuing education credits (Al-Matari et al., 2014). Continuing education allows them
39
to be proficient in different areas including the identification of fraud risks, threats to
business continuity, risk assessment, IT skills, and conducting business impact analysis
(Dickins & Reisch, 2012).
Internal audit and risk management. Internal auditors are required to comply
with the Institute of Internal Auditor’s International Standards for the Practice of Internal
Auditing (de Zwaan, Stewart, & Subramaniam, 2011). In 1999, the Institute of Internal
Auditors redefined internal audit to encompass three areas: (a) risk management, (b)
control, and (c) governance (de Zwaan et al., 2011). Enterprise risk management has
been defined as a process which is effected by those charged with governance within an
organization, management, and other applicable personnel assigned to identify potential
threats or events that could potentially affect an organization, manage the risk to an
acceptable appetite, and provide reasonable assurance of achieving overall objectives of
the organization’s goals and objectives (Hosban & Hamdan, 2015; Pang & Li, 2013).
Internal auditing is a significant component of an entity’s governance, overall risk
management, and internal control (Anderson, Christ, Johnstone, & Rittenberg, 2012).
The internal auditor provides an independent evaluation of systems in place within an
organization and provides reasonable assurance to the management on whether internal
control is functioning as intended (Guxholli, Karapici, & Gjinopulli, 2012). Management
has to institute a good internal control to ensure proper documentation and
implementation of the business continuity planning (Jalba, 2013). In the past, internal
auditors analyzed documents, reconciled bank accounts, identified issues, and made
recommendations for eradicating the cause of the issues discovered (de Zwaan et al.,
2011). More of the issues identified related to errors made by staff or the lack of
40
understanding of established policies and procedures (de Zwaan et al., 2011). Owing to
the increased reliance on technology and the number of vulnerabilities and threats, an
organization could leverage the knowledge of the internal auditor during the development
of the policies and procedures related to business continuity to ensure alignment with the
overall organizational risk management and reduce redundancies (Mekdeci, 2011). A
good business continuity strategy is to conduct a periodic business impact analysis on the
critical systems to make sure they are still valid (Jarvelainen, 2012). The business impact
analysis serves as an introduction to the issues facing the government in terms of
resources, critical systems, and operations. The government sector can use the business
impact analysis to evaluate threats and risks and critical systems required to provide
services. Based on the business impact analysis, the government, just like other
organizations, can determine the recovery time objective for critical functions. The
recovery time objective is the maximum time allowed to recover a business unit or
function. If the recovery time objective is surpassed, the government sector will incur a
significant loss. An organization may use a combination of questionnaires and interviews
during the business impact analysis. The internal auditor is in a position to facilitate the
development of the questionnaires to ensure they are sufficient and relevant (Stewart,
2009).
The management of a government sector might sometimes be worried about
regulatory mandates and privacy issues such as health and human services, whether
information technology strategies are aligned with the overall organizational goals and
regulatory requirements fulfilled (Ayalon, 2011). Additionally, the oversight board
wants to ensure that appropriate controls are considered to provide reasonable assurance
41
that data integrity is guaranteed in the event of a disaster (Odoyo, Omwono, & Okinyi,
2014).
Additionally, the internal auditor could serve as a resource during the update of
the business continuity plan to ensure significant changes to critical business processes
have been captured (Mekdeci, 2011). A good business practice ensures that backups are
frequently tested to confirm that data can be restored to form in the event of a disaster
and that restoration can occur within the recovery time objective and recovery point
objective instituted by an organization (Sawalha, Anchor, & Meaton, 2012). The internal
audit reviews the business continuity planning to ensure that there is periodic training and
awareness regarding threats and vulnerabilities (Camara, Crossler, Midha, & Wallace,
2011; DHS, 2015).
Another role of the internal auditor would be to make sure that during the
procurement process of third party providers, a full cost and benefit analysis was
performed to ensure that the outsourcing made sense and proper diligence was
sufficiently performed (Kent, 2011). The analysis might include determining whether it
would be cheaper to perform the process in-house in lieu of outsourcing (Kent, 2011). In
essence, if the data center were operated in-house, how much would it cost the
organization versus outsourcing the function; this might include getting the key business
units to be involved in the process (Nicoll & Owens, 2013). This process is considered a
transfer of risk to another entity; however, it is a part of the organization’s cost in the
business continuity planning process (Wees, 2013). An organization’s objective should
be to ensure that the cost of the business continuity planning does not outweigh its
benefits (Baker, 2012).
42
To further support this assertion of the independence of the internal auditor,
Franck and Sundgren (2012) found organizations that have internal audit functions are
more likely to discover and report fraudulent activities than those operating without any.
Marques (2014) added that internal auditors are likely to uncover fraudulent activities and
corruption. As a result, an organization can expect the internal auditor to assess
objectively the threats and risk factors affecting the entity to ensure continuity of business
processes if a catastrophic event occurs (Franck & Sundgren, 2012). A conflict might
arise on account of a simple disagreement between individuals, groups, and departments
in organizations, such as the government, in determining critical businesses or allocating
the resources earmarked for business continuity business. Since no organization is
immune from conflicts, the internal auditor is in a position to serve as the eye of the
board of directors in making sure the overall interests of the organization is represented,
especially, when analyzing the need for a business continuity plan. A conflict that is not
adequately or independently resolved, especially when related to business continuity
planning, could negatively affect an organization (Mukhtar, 2013).
Owing to regulatory requirements, there has been an increased awareness and
demand for internal assurance within organizations (Dickey et al., 2006). Internal
assurance includes the need for adequate internal control and risk management.
Independence and objectivity are required to accomplish this task, and the internal
auditor is in a position to provide this assurance (Soh & Martinov-Bennie, 2011). The
Health Insurance Portability and Accountability Act and the Sarbanes-Oxley Act are
examples of the increased regulations that warrant the need for the protection of
organizations’ assets. Furthermore, there has been an increase of dangers related to
43
terrorism, natural disasters, and even fraudulent acts within organizations (Randeree et
al., 2012). These threats pose significant risks to organizations, especially governmental
agencies whose services are needed at all times. Also, the media exaggeration has
amplified the public perception of these risks (Randeree et al., 2012).
Role of Internal Auditor
Generally, the internal auditor would make a recommendation for the
improvement of the processes in place. Management valued the opinion of the internal
auditor, and as a result relied immensely on that function. Nowadays, internal auditing
has expanded to encompass functioning in an advisory capacity to management and those
charged with governance (de Zwaan et al., 2011). Additionally, the internal auditor is
charged with addressing concerns about risk identification, risk evaluation, and the
implementation of internal control to ensure achievement of an organization’s goals. As
a result, many organizations have begun paying more attention to internal auditing and
enterprise risk management structures (Jalba, 2013).
Although organizations may be aware of the need to protect their assets, some are
not knowledgeable or are reluctant to implement a business continuity plan (Pathirage et
al., 2012). Therefore, involving the internal auditor ensures that these critical business
processes are identified. If any are excluded by management, possibly on account of
unnecessary conflicts, the unbiased internal auditor is in a position to report such
omission to the board of directors (Randeree et al., 2012). The internal auditor is in a
position to relay to the board of directors or its designated committee whether
management understands risks affecting the organization and the potential impact of any
loss (Schneider et al., 2012). The internal auditor also assures the board of directors or its
44
designated committee that management of the organization can effectively mitigate any
business continuity risks to acceptable levels (Stefaniak et al., 2012). Additionally, in
situations where management has decided to assume the risk of undesirable business
continuity risk, the internal auditor notifies the board and also ensures sure a decision has
been adequately documented (García et al., 2012).
The internal auditor evaluates critical functions within the organization and as
such participates in the improvement of governance, risk management, and control
processes (Christopher et al., 2009). Internal auditors are expected to promote the right
ethical values by communicating significant risk exposures to the appropriate level of
management and those charged with governance (Leung, Cooper, & Perera, 2011). As
the evaluators of critical functions, the internal auditors understand the need for business
continuity planning (Christopher et al., 2009). Additionally, due to their knowledge of
the organization and understanding of risk management, they understand firsthand the
steps that should be taken to ensure proper development and implementation of business
continuity planning (Christopher et al., 2009). They can also educate management and
those charged with governance on potential threats to the organization, and the
importance of supporting business continuity planning with adequate resources (Kanellou
& Spathis, 2011). Resources include the right individuals and funds needed for the
business continuity plan. The internal auditors can also assist in educating employees
and creating proper awareness and ensure activities align with overall objectives of the
organization (Kanellou & Spathis, 2011).
Internal auditors determine whether the structures implemented by management
are adequate and functioning appropriately (Jalba, 2013). In essence, internal auditors
45
can change management’s strategic objectives through recommendations based on the
execution of the internal audit plan. Management values the work of the internal auditors
not only because of their independence but because of the standards they follow in
accomplishing internal audit tasks (Soh & Martinov-Bennie, 2011). The work of the
internal auditor requires collecting data and evaluating risk; this aids in providing
pertinent information in an advisory role. The roles are advisory in matters related to
information technology systems and strategic risks affecting the organization (Leung et
al., 2011). Additionally, this function is considered a first-line of defense in opposition to
unacceptable response to corporate risks (Muqattash, 2011). The internal auditor’s role is
explicitly specified by those charged with governance or its designated audit committee
(Muqattash, 2011).
Authority of the internal auditor. The internal auditor, who is the head of the
internal audit function, provides an objective assessment of risk management and reports
to those charged with governance within an organization. Those charged with
governance is the board of directors of an organization or its designated committee
(Dickins & Daughterty, 2012). The authority of the internal auditor is documented in the
organization’s internal audit charter, which is approved by those charged with
governance or its designated committee (Holt, 2012).
The authority of the charter helps ensure objectivity by the internal auditor
(Aikins, 2012). For example, a government agency manager cannot try to reduce the
scope of the internal auditor’s function or even reject the recommendations of the internal
auditor without the approval of the board of directors. In essence, the management of an
organization cannot override the mandate of a charter without the approval of the board
46
of directors (Aikins, 2012). As a result, the internal auditor is believed to be impartial
and unbiased in the discharge of his or her duties (Muqattash, 2011).
The Institute of Internal Auditors requires that the internal auditor maintain
objectivity and be independent in performing his or her duties (Muqattash, 2011).
Internal auditors in the government sector are considered watchdogs because they are in a
position to promote trust and accountability owing to their independence (Elmore, 2013).
As a result, the internal auditor avoids any conflicts of interest and is free to report any
corporate risks and serve as an early warning system to the board of directors and the
organization as a whole. For example, a part of developing a business continuity plan is
identifying critical business processes to ensure adequate protection and recovery
(Randeree et al., 2012).
Internal auditor and third parties. The participation of the internal auditor
ensures full knowledge of the contract terms between the organization and the third-party
providers (Nicoll & Owens, 2013). This knowledge provides an opportunity for the
internal auditor to monitor the contract requirements and risks associated with the third
parties. Some of this monitoring might include reviewing for compliance with business
continuity, adherence to laws and regulations, or maintenance of certain financial ratios
or other key performance measures to continue to qualify to contract with the government
agency (Nicoll & Owens, 2013). Another key role of the internal auditor would be to
determine how data will be transmitted, received, and validated, and whether a third party
is to be used for back-up of data (Wayman, 2013).
The internal auditor could facilitate the testing of application controls of the third
party (Wayman, 2013). During that process, the internal auditor might discover certain
47
application controls are different for providers being considered, even though the data
field layout might be the same. Additionally, the internal auditor would ensure the third
party has sufficient information security policies, guidelines, and monitoring. The
agreement with the third party could include a requirement to encrypt all data files and
maintain them on a secure network (Wayman, 2013).
The internal auditor would also review the third party’s business continuity to
ensure there is a procedure for recovering critical data (Wayman, 2013). Alternatively,
the internal auditor might determine whether the third party service provider has
undergone an external review performed in accordance with the American Institute of
Certified Public Accountants on Standards for Attestation Engagements No. 16,
previously known as No. 70. This could limit the level of front-end information
technology review to be conducted by the internal auditor (Wayman, 2013).
The members of management and those involved in the activities of the
organization might not be cognizant of the internal control and its effect regarding the
third party (Wayman, 2013). They also might not know the role of the internal auditor in
helping the organization mitigate risks. To help ease this issue, the internal auditor might
conduct training sessions in internal controls, the roles of the internal auditor within the
organization, and risks associated with third party service providers (Wayman, 2013).
The Government and Readiness
A study indicated that management of public sector organizations spend relatively
more time than their private counterparts dealing with different crises (Thach, 2012).
One explanation is because they are responsible to various constituencies and changes
related to legislation and budget (Thach, 2012). Any significant service disruption within
48
a government agency affects its stakeholders, including the public (Leverty, 2012). As a
result, government agencies must be readily available to ensure the protection of the
public during disasters. Prevention cannot be accomplished without a steady or periodic
assessment of risks (Chang, Huang, Roan, Chang, & Ying, 2014).
Types of disasters. Organizations and communities are steadily exposed to
different types of disasters warranting the need for business continuity planning (Afedzie
& McEntire, 2010). The different types of disasters that can affect the government may
include inherent, environmental, external, and internal disasters. Inherent disasters may
include fire, flood, and tornado; environmental disasters may include power outages or no
telephone; external disasters may include terrorism and sabotage; and internal disasters
may include employee misdeed, fraud, and accident (Bajgoric, 2014; Verchick & Hall,
2011). Government agencies, just like other organizations, must develop a business
continuity plan using different relevant expertise to ensure proper identification of risks,
threats, impact analysis, and mitigations of those of risks (Afedzie & McEntire, 2010).
Inherent disasters can occur at any time, and when it happens, it can affect an
entire region, city, state, and even international boundaries. As a result, organizations,
such as government entities, need to plan for unforeseen events by deploying the relevant
resources to ensure adequate mitigation of potential disasters (Amancei, 2011). For
example, the state of Iowa has experienced three catastrophic floods since 1993
(Verchick & Hall, 2011). The 2008 floods significantly affected cities within Cedar
Rapids and other neighboring communities and caused several million dollars in property
damages (Verchick & Hall, 2011).
49
Uncertainties created by inherent disasters have caused experts in the United
States to begin paying significant attention to rainstorms (Maurice, 2013). Maurice
(2013) felt the frequency and intensity of rains are to be blamed for the precipitation
increase noticed in the United States over the last half-century. Heavier rains, floods, and
hurricanes increase the chances of larger property damage. For example, it is estimated
that the flooding that occurred in the United Kingdom in 2007 affected about 7,000
organizations and caused over $4.5 billion in damages (Wedawatta & Ingirige, 2012).
Other inherent disasters include heat waves, wildfires, and even epidemic illnesses, which
ultimately may affect the continuity of critical operations of the government (Verchick &
Hall, 2011). These potential disasters could significantly disrupt services and cause a
delay in restoring critical governmental functions and negative reactions from the public
may ensue (Lester & Persia, 2011). Well-designed business continuity planning would
include identification of these threats, their probability of occurring, and indicate an
objective plan for the mitigation of any possible service disruption (Gunnec & Salman,
2011). However, these tasks would require the expertise of those with risk management
experience, such as the internal auditor (Anderson et al., 2012).
Cities in the United States face disaster risks. However, some have the highest
natural disaster exposure risks, such as Miami, New Orleans, Oakland, San Francisco,
Honolulu, San Jose, Houston, Los Angeles, and Long Beach (Sun, 2011). Also, many
interior cities, such as Oklahoma City, Tulsa, Sacramento, and Memphis face serious
disaster risks (Sun, 2011). In 2008, there were 37 natural catastrophes, which resulted in
about $25 billion in losses (Born & Klimaszewski-Blettner, 2013). Government agencies
in the United States can easily be affected by any of these catastrophic events. As a
50
result, proper business continuity planning is required to ensure mitigation of disruptions
that may be caused by these events (Omar, Alijani, & Mason, 2011).
The terrorist attack on the homeland of the United States on February 26, 1993,
left an indelible mark on the history of the United States (Sorial, 2011). Prior to this
incident, terrorism was considered an external issue with a remote or no potential impact
on the United States (Sorial, 2011). On that date, Islamic terrorists ignited a 1,500-pound
bomb in the World Trade Center that killed six people and critically injured hundreds of
people (Law & Robson, 2014). Many thought that was an aberration because the stock
market was not hugely impacted; the next day the market fall was less than 1% (Law &
Robson, 2014).
The year after the 1993 World Trade Center bombing, the stock market
experienced an average gain of 13.7% (Law & Robson, 2014). That event was quickly
forgotten until September 11, 2001, when the United States was hit again. On that day,
two planes crashed into the World Trade Center; one crashed into the Pentagon, and
another into a field in Pennsylvania. Those events have permanently changed the United
States as a nation (Sorial, 2011). As a result, there were an estimated 2,700 deaths
reported in New York and 125 in the Pentagon, and an economic loss of over $80 billion
(Sorial, 2011).
Many organizations had not been adequately prepared to mitigate the impact of
those World Trade Center attacks (Law & Robson, 2014). Although overall, disaster
recovery and business continuity planning were in place; they were not adequately
implemented (Law & Robson, 2014). As a result, many organizations were not able to
continue providing services after the September 11, 2011, attacks and eventually
51
discontinued business operations (Law & Robson, 2014). On August 14, 2003, New
York City experienced an electrical blackout that is still considered one of the largest
catastrophic events in United States history (Farley & Weisfuse, 2011). The blackout,
which lasted approximately three days, affected eight United States’ cities and parts of
Canada.
The threats of catastrophic events need to be understood as such events could
have significant negative effects on the government (Law & Robson, 2014). Lessons
learned from different catastrophic events are that unexpected events may have a negative
impact on an establishment if there are no strategies for mitigation (Grimaila & Badiru,
2013). Some establishments fail to recover from a disaster because of insufficient
knowledge of threats, vulnerabilities, and the lack of resources (Chang, Wilkinson,
Potangaroa, & Seville, 2012). Some establishments fail to recover from a disaster
because of insufficient knowledge of threats and vulnerabilities (Malalgoda et al., 2013).
Additionally, there might be the lack of specified responsibilities and coordination, and
the use of inappropriate expertise during the development of the business continuity plan
(Malalgoda et al., 2013). To ensure adequate readiness, business continuity planning
would require the deployment of different expertise, such as the internal auditor, to
participate in business impact analysis, risk assessment, and designing the right solution
for the establishment (Pierson, 2013).
A large percentage of entities fail to understand how business continuity planning
could mitigate the impact of service disruptions, including the different roles involved in
its implementation (Chamlee-Wright, 2010). Business continuity planning, a risk
management process, should be in place and properly implemented by the government to
52
ensure mitigation of disasters and protection of consumer interest (Lindberg & Seifert,
2011). For example, insurance companies, as well as other segments of the financial
services industry, should make sure that risk management programs are in place and
functioning properly (Karim, 2011). The companies must be monitored by state
regulatory agencies as required by law to ensure adequate protection of consumer interest
(Lindberg & Seifert, 2011). Ironically, governmental entities sometimes do not have the
right information or tools to make decisions (Ben-Shahar & Logue, 2013). Additionally,
they have limited resources to monitor those they regulate (Ben-Shahar & Logue, 2013).
The United States has faced its share of disasters and as a result, there have been
efforts by the government sectors, including nonprofits, healthcare, and academics, to
prepare for and mitigate disasters (Staley, Zelman, Porto, Hobbs, & Paul, 2009). When a
disaster occurs, the job of the governmental agencies is to ensure their functions can
operate during and after a disaster or other contingency, and then minimize recovery time
to reach normal operations, thereby protecting the public (Johnston, Becker, & Paton,
2012). As a result, there must be an alternative path in support of critical business
processes in the event of an emergency, disaster, or disruption of services, which would
include establishing goals. These goals must be supported by management and those
charged with governance as well as incorporated into the overall management of the
organization (Karim, 2011). There must be an agency-wide risk assessment that would
include the identification of threats, the probability of occurrence, and business impact
analysis (Pinta, 2011). There must be strategies for mitigating the impact of service
disruptions, a business continuity plan development, implementation, training, testing,
and periodic reviews (Nicoll & Owens, 2013). A governmental agency could lack the
53
expertise to carry out these tasks; therefore, the internal auditor could serve as a
facilitator in this effort (Pierson, 2013).
The internal auditor should be in a position to provide assurance to management
and those charged with governance that response plans related to the business continuity
plans are appropriate, flexible, and adaptive and that the individuals identified in the
business continuity plans are capable of executing the recovery process effectively.
Additionally, the internal auditor could ascertain that the business continuity plan is
regularly reviewed and that it is updated when deemed necessary, especially when new
threats and vulnerabilities are highly probable (Mix, 2012).
Historical Legislative Perspectives
No entity is immune to disasters. In 1973, the United States enacted the Flood
Disaster Protection Act by expanding national flood insurance (Herbane, 2010). In 1977,
the US Foreign Corrupt Practices Act was enacted (Herbane, 2010). Although the US
Foreign Corrupt Practices Act was enacted was enacted to thwart and indict cases of
bribery and corruption of foreign officials, it also included a provision requiring the
keeping and safeguarding of organizational records from damage (Darrough, 2010).
These new accounting rules were enacted to provide reasonable assurance of preventing,
among other things, unlawful or unsupported transactions and misrepresentation of data
or records (Weber & Wasieleski, 2013). Additionally, these rules would provide the
possible benefits of improved financial reporting and compliance with applicable laws
and regulations (Krishnan & Yu, 2012). To ensure compliance with these rules,
insurance companies must be steadily monitored by insurance regulatory agencies
(Karim, 2011). Such monitoring would require the availability of data whenever needed
54
(Karim, 2011). Additionally, management needs timely information to ensure proper
assessment of operational risks (Năstase & Unchiaşu, 2013). As a result, governmental
agencies would benefit from well-designed and implemented business continuity
planning. Such timely information would afford management an opportunity to decide
whether to accept, mitigate, avoid, transfer, or eliminate the risks arising from an
incident. Management could also calculate the residual risk and cost of risk (Năstase &
Unchiaşu, 2013).
The United States’ Office of Comptroller of Currency Banking BC-177 of 1983
required US banks to implement formal disaster recovery plans, which included testing
(Herbane, 2010). The US Expedited Funds Availability Act of 1989 required all
federally chartered financial institutions to make provisions for next day availability of
deposits, including the implementation of business continuity plans (Herbane, 2010).
The World Trade Center attack that occurred in September 2001 in the United
States necessitated the need for a revaluation of business continuity planning (Law &
Robson, 2014). That event resulted in the loss of thousands of lives, injuries, and
unavailability of buildings and telecommunications. Since then, there have been a
plethora of regulations within the financial services sector (Sorial, 2011). Such
regulations have come from the Federal Reserve Board, Office of Comptroller of
Currency, and the Securities and Exchange Commission. One regulation is the
requirement for a business continuity planning and disaster recovery for the financial
services sector (Herbane, 2010).
The 2005 Hurricane Katrina caused significant service disruptions in the United
States, resulting in over 1,800 deaths and an estimated $80 million in damage (Baker,
55
2012). Also in 2005, New Zealand experienced a total telecommunications network
failure (Baker, 2012). In a survey of 240 senior executives in the United States about the
entity’s business continuity planning, it was observed that 21% suspended their business
operations on account of the harm caused by a disaster. A well-implemented business
continuity plan mitigates service disruptions and negative impact to services (Karim,
2011).
Organizations and Business Continuity Planning
Organizations of all sizes continue to work hard to safeguard their assets should a
disaster occur; they recognize that availability of data can give them comfort and help
ensure long-term availability of services. However, researchers have noted that while
some organizations have business continuity plans to ensure continuity of business, most
businesses are far from meeting their objectives when an emergency occurs (Lindström,
Samuelson, & Hägerfors, 2010). When organizations were less dependent on
information technology, alternative plans for business resumption and activities during an
emergency were manual in nature. The plans often included temporarily replacing a
crashed computer system with older, paper-based processes, which the workers might
already know (Afedzie & McEntire, 2010).
Today, organizations, including the government, are more dependent on
information technology. The experiences of the BP oil spill, Hurricane Katrina in the
United States, and tsunamis give a clear indication that a disaster can occur at any time
without any prior warnings (Ostrander & Lowry, 2012). While organizations are still
trying to understand the need for business continuity planning, the internal auditors have
been proactive in recognizing the importance of mitigating the impact of disruptive
56
events (Sarens, Abdolmohammadi, & Lenz, 2012). The internal auditor is in an excellent
position to assist with the identification and assessment of risks in the organization
(Sarens et al., 2012). The first task might be to get senior management to understand the
need for business continuity planning. One approach would be to outline the specific
areas within an organization that could be impacted as a result of a disaster: loss of
information technology, personnel, business facilities, and third parties with critical
business relationships with a government establishment (Baker, 2012).
Crisis may arise from different sources, such as vendors, customers, and
organization’s facilities. Even information security risks are considered possible business
continuity threats. As a result, some organizations are requiring their independent audit
organizations implement a business continuity plan to ensure mitigation of disruption of
services (Jarvelainen, 2012). Some organizations mitigate service disruptions and ensure
continuity of business by controlling their suppliers by requiring business continuity
plans, periodic testing of these plans, and relevant certification (Cascardo, 2012).
However, for the majority of organizations, certainly, for the large ones, this controlling
of suppliers is no longer possible (Cascardo, 2012). With most processing requiring
access to increasingly integrated applications and databases, when the system is down,
there is no opportunity to do any meaningful work. Researchers have tried to determine
how organizations can mitigate the impact of disasters (Afedzie & McEntire, 2010), and
some have concluded that there should be a frequent backup of data, preparation of a
business continuity plan, periodic meetings, and involvement of all stakeholders
(Lehman, 2010).
57
Mitigating a Disaster
All stakeholders should participate in the planning for reducing the impact of
disasters (Biedrzycki & Koltun, 2012). The stakeholders should include employees, the
board of directors, elected officials, customers, consumers, suppliers, and the public
(Afedzie & McEntire, 2010). There should also be a risk assessment and impact analysis
(Pinta, 2011). Risk assessment would include defining the types of risks or threats to the
organization and impact analysis would include analyzing the probability of threats
occurring and their impact (Afedzie & McEntire, 2010).
To mitigate hazard, there should be adequate preparedness (McEntire, 2012).
One of the first steps is to determine the types of disasters that can occur within the
specific vicinity where the government agency resides (McEntire, 2012). This
determination could be achieved through consultation with various relevant resources
within the organization, such as the internal auditor (de Zwaan et al., 2011). The internal
auditors probably understand the functions of their respective agencies more than any
other person because of their roles in performing organization-wide risk assessments as a
part of determining the auditable areas to be proposed to the board of directors for audit
or evaluation (Sarens et al., 2012). This knowledge includes formulating, testing, and
exercising disaster plans. There should also be adequate training and discussion with the
public and others about disasters and how to mitigate them (Sarens et al., 2012).
McEntire (2012) also discussed the variables that determine the degree of
vulnerability. Some groups, individuals, groups, organizations, and communities are
more vulnerable than others; however, the vulnerability can be minimized. But to reduce
vulnerability, there should be a strategy for reducing risks, susceptibility, and increasing
58
resistance and resilience (Verchick & Hall, 2011). Other risk-reducing strategies include
disaster prevention training and coordination with other coalition partners (Chen & Lee,
2012).
A business continuity plan is a part of long-term planning for an organization
(Momani, 2010). An example is the lasting effect created by Hurricane Katrina on
August 28, 2005, which caused significant service disruptions (Farber, 2011).
Additionally, in a survey of 240 senior executives about the entity’s business continuity
planning, it was observed that 21% suspended their business operations because of the
harm caused by a disaster (Karim, 2011). A well-implemented business continuity plan
mitigates service disruption and negative impact to services (Karim, 2011).
Another issue requiring attention is the outsourcing of tax preparation overseas by
tax preparers (Desai & Roberts, 2013). The client’s concerns have been the security of
information and the associated business risks, such as business continuity (Wayman,
2013). Some tax practitioners, especially certified public accountants, have tried to
alleviate their clients’ concerns by implementing business continuity and disaster
recovery plans (Desai & Roberts, 2013). These certified public accountants are regulated
by governmental agencies, which must ensure that licensing information is current and
available at all times. As a result, there must be continuous assessments of business
continuity plans to ensure up-to-date alignment with the long-term goals of the
government sector. The internal auditors oftentimes participate in assessing risks but
have rarely participated in business continuity planning (Desai & Roberts, 2013).
59
Possible Impact of a Disaster
A disaster is a significant and unpredictable incident that has the potential to
present negative results for an organization. The possible impacts of a disaster to an
organization might include legal obligations due to noncompliance with the law, violation
of contracts with suppliers, and other interested parties (Bayrak, 2009). Certainly, for the
organizations that outsource certain activities, such as data centers, computer help desks,
and facility maintenance, there could be enormous financial, legal, and compliance risks
related to such associations if a disaster occurs. Therefore, the participation of the
internal auditor in the business continuity planning is essential to ensure the identification
of internal risks and control gaps associated with the outside service providers (Wayman,
2013).
If an organization, such as a university, goes down because of the impact of a
disaster, the concern is what could happen to an employee. Additionally, concerns would
be regarding how students, the public, and customers perceive the organization because
of the decline as a result of the disaster. For example, in September 2008, Hurricane Ike
hit Lamar University, Beaumont, Texas (Beggan, 2011). According to Beggan (2011),
the 2000 U.S. Census showed that the city of Beaumont had a population of 113,866 and
the university was a significant part of this government’s social and economic
infrastructure and it was considered a top 10 employer in the city. Owing to the
hurricane, the university was closed for about 10 days and suffered approximately $11
million in damages (Beggan, 2011). Hurricane Ike resulted in the withdrawal of 150
students and tuition, and fee losses of $480,000 for the 2008 fiscal year (Beggan, 2011).
However, this was significantly less because of the lessons learned in the previous
60
hurricane, Hurricane Rita. Hurricane Rita caused the university to close for 20 days and
generated approximately $38 million of damages (Beggan, 2011).
The 2005 flooding that emanated from Hurricane Katrina in New Orleans created
the need for businesses and educational institutions in vulnerable vicinities to reevaluate
their plans for disaster recovery (Baker, 2012). Many businesses were incapacitated
because of the loss of information spanning several years (Baker, 2012). Similar to the
flooding, there have been several power outages in modern industrial societies that had
significant economic impact (Omar et al., 2011). Examples were the power outages in
the Northeastern United States and Canada in August 2003.
Many insurance companies became insolvent after the 1992 Hawaii and Andrew
hurricanes, and the 2004-2005 Florida hurricane season (Carson, McCullough, & Pooser,
2013). The 10 costliest hurricanes in the United Stated impacted the State of Florida and
seven of these events occurred in 2004 and 2005 (Carson et al., 2013). Owing to the
impact of the 2004-2005 hurricanes, five insurance companies in Florida became
insolvent, and claims totaling $1 billion were paid by the Florida Insurance Guaranty
Association and ultimately passed the costs to the policyholders (Medders, McCullough,
& Jäger, 2011). To mitigate the impact of the risks associated with catastrophic events,
the United States government has tried to intervene by providing capacity for the funding
of these events. However, general participation varies based on the magnitude of loss
(Medders et al., 2011).
The Federal Emergency Management Agency (FEMA) provides monetary
assistance to organizations when there is a declared disaster (Nicoll & Owens, 2013).
FEMA has been active in providing guidance to organizations to ensure adequate
61
preparation for disasters. There are tips for different disasters, including earthquakes,
fire, and flood (Nicoll & Owens, 2013). This agency became part of the U.S. Department
of Homeland Security in 2003 in the wake of the 9/11 terrorist attacks. However,
policymakers in the United States have held different perspectives on whether the
government should be participating in the funding of catastrophic losses (Nicoll &
Owens, 2013). For example, the exposure of future earthquakes in the United States is
significant, making the management of risk related to disaster an important issue
(Medders et al., 2011). Another example is that New York has had a constant threat of
tropical storms and in 2005, 15 hurricanes made their way into the North Atlantic region
of the United States (Medders et al., 2011). Additionally, the annual cost for disasters
arising from power outages to United States consumers is estimated to be $79 billion
(Omar et al., 2011). Therefore, business continuity is one of the most significant
concerns of management in the United States, ranking fourth overall (Luftman & Zadeh,
2011). However, studies have indicated that businesses are not ready for possible
disasters, and consequently, some do not survive disasters (Luftman & Zadeh, 2011).
Organizations should ensure that critical business processes are available when
needed; however, not all processes can be available compared to the costs associated with
that function. Additionally, important, but noncritical, processes can be unavailable
when needed. As a result, it is important that the right combination of personnel perform
a business impact analysis in which all are considered. This exercise helps prepare for
possible disruption of services (Akkiraju, Bhattacharjya, & Gupta, 2012).
Mitigating different disruptions stemming from natural or human-made hazards,
or technological causes are one of the primary reasons for implementing business
62
continuity planning (Asgary & Mousavi-Jahromi, 2011). The risk of service disruptions
has amplified as organizations continue to depend heavily on technological infrastructure
and the majority of businesses have incurred some form of disruptions on account of
power outages (Asgary & Mousavi-Jahromi, 2011). In a survey conducted in 2001, it
was determined that 70% of the organizations interviewed had had service disruptions
emanating from power outages, which generated significant expenses to businesses and
their major customers. Furthermore, in a recent survey of international business
organizations, it was determined that in excess of 87% had activated their business
continuity plans as a result of a power outage. As a result, businesses are taking different
measures to ensure adequate protection of information assets. For example, the power
outage in the Northeastern United States and Canada on August 2003 resulted in
significant economic impacts (Omar et al., 2011). The annual cost resulting from power
outages to United States electricity consumers is $79 billion (Omar et al., 2011).
Organizations and communities are steadily exposed to different types of disasters
and as a result, government, healthcare, and academia have been intensifying efforts to
ensure mitigation of disasters (Staley et al., 2009). In the late 1970s and 1980s,
governments began creating a statutory framework to get involved in mitigating disasters
(Hemond & Benoit, 2012). For example, in 1979, the United States created FEMA. In
the 1960s, the Canadian government passed its first laws related to mitigating disasters.
Also, in 2006, the International Organization for Standardization has also conducted a
symposium on how to mitigate disasters (Hemond & Benoit, 2012).
Different types of service disruptions can be very catastrophic to organizations
and can negatively affect business organizations. The possible ramifications of the lack
63
of business continuity plan or an inadequate plan can result in significant risks, which
may include the loss of public trust and ultimately the deterioration of critical functions
(Guster, Lee, & McCann, 2012). Stakeholders have been scrutinizing organizations’
preparedness for a long time (Guster et al., 2012). Another issue faced by organizations
is acquiring relevant skills to ensure adequate development, evaluation, and maintenance
of the business continuity plan and disaster recovery (Kanellou & Spathis, 2011).
Developing a business continuity plan requires at a minimum risk assessment, a
business impact analysis, team development, organization-wide awareness and training,
and coordination with government agencies responsible for safety and emergency (Guster
et al., 2012). There should be simulations and other exercises. This concept, which is
widely used today, was borrowed from the military. Management and employees of
organizations have been integrated into plans to mitigate disasters. As a result, they are
able to develop management tools and anticipate the impact of disasters and how to
manage them (Hemond & Benoit, 2012).
Implementation of key policies would help enhance resilience during a disaster
(Kantur & Arzu, 2012). Public and private organizations can embark on new
technologies, such as alternative power sources. Additionally, local, state, and federal
governments can promote resilience by sharing pertinent information. Such information
sharing could strengthen the coordination of mundane services (Kantur & Arzu, 2012).
Preparing for a Disaster
Most organizations are completely dependent on their computer systems and
supporting information technology personnel, communication network, files, and
program (Grosskopf, 2010). Most organizations also recognize that success could
64
depend on the capacity to provide information whenever requested by the customers,
employers, suppliers, and other stakeholders (Omar et al., 2011). As a result, it has
become imperative for the management of these organizations to find effective ways of
protecting information assets and plan for swift recovery should a disaster occur (Omar et
al., 2011). Disaster planning involves much more than backing up data. Some
organizations focus primarily on violence in the workplace, wildfires, and weather, but
the landscape of the world has steadily been changing; therefore, organizations need to
explore future potential hazards or threats. Even the U.S. government has developed
guidance to assist staff in assessing and quantifying the risk hazards such as terrorism,
infectious diseases, and evolving risks (Law & Robson, 2014). For example, the U.S.
Department of Homeland Security developed the Handbook for Rapid Visual Screening
of Buildings to Evaluate Terrorism Risks (FEMA, 2009; Nicoll & Owens, 2013).
An organization should periodically conduct a comprehensive risk analysis that
identifies its critical business systems, the risks applicable to those systems, the
probability of a disaster occurring, and the effect of the disaster on business functions
(Bayrak, 2009). Additionally, there should be a system in place for updating the risk
analysis whenever there are major changes affecting these critical systems. Such changes
may include information technology, service agreement, and processing requirements.
Another component of the risk analysis is identifying critical business processes and the
order of restoration if there is a disruption of service. To conduct a good risk analysis,
the organization’s management must provide the needed support. When such support is
lacking or inadequate, resources might not be properly utilized or prioritized. As a result,
65
the business continuity plan might not align with the overall goal of the organization
(Bayrak, 2009).
Responding to a Disaster
The government plays a significant role in the mitigation of disasters. But some
government agencies fail to prepare properly and respond to disasters because of
inadequate preparation, lack of resources, and other pressing needs (Henstra, 2010). If
the government fails to plan appropriately for a disaster, the public’s safety, financial
security, and self-reliance is significantly affected (FEMA, 2015). Some organizations
fail in their response to a disaster on account of a lack of communication and training
(Jahangiri, Izadkhah, & Seyed, 2011). In a survey of 200 organizations of all sizes,
approximately 57% successfully achieved the recovery time objective, while 33% did
not, and 10% could not invoke their business continuity plan (Ojha & Gokhale, 2009).
Failure can happen to the government if a business continuity plan is not adequately
implemented.
Flooding can play a significant role in our society as a whole. There could be
damage to buildings, building equipment, and staff shortages, which could result in the
inability to conduct business. For a government agency, such an event could negatively
disrupt business. In a recent investigation of senior executives, they rated the
government right below their customers as the most important constituency (Johnson,
2010). There have been a number of flood events in the United Kingdom in recent years,
and the forecast is that it will increase in the future because of changes related to climate
(Wedawatta & Ingirige, 2012). The 2007 flooding affected over 40,000 homes and about
66
7,000 businesses in the United Kingdom and caused damages of approximately $4.5
billion (Wedawatta & Ingirige, 2012).
In addition to the United States government’s involvement in business continuity
planning in the 1970s and 1980s, and the creation of FEMA in 1979, the military started
its preparedness in the 1970s in the civil service arena (Hemond & Benoit, 2012). In the
1990s, management was integrated into the concept of preparedness, which resulted in
the development of management tools to ensure adequate mitigation of service
disruptions (Wedawatta & Ingirige, 2012).
In recent times, the hazards of business interruptions have intensified as
businesses have increasingly become dependent on information technology
infrastructures that are extensively linked to external resources (Sawalha, Jraisat, & Al-
Qudah, 2013). Having an effective business continuity plan ensures mitigation of service
disruption and recovery of information assets (Momani, 2010). In essence, while it might
not be possible to prevent or eliminate service disruptions, the goal is to reduce the effect
of any unforeseen emergencies (Sudmeier, Jaboyedoff, & Jaquet, 2013). For example,
during the financial crisis of 1997, especially in Southeast Asia, the Singapore dollar was
devaluing quickly against the United States dollar because of adverse currency pressures
from other nearby countries, including Thailand (Pheng, Ying, & Kumaraswamy, 2010).
In essence, while it might not be possible to prevent or eliminate service disruptions, the
goal is to reduce the effect of any unforeseen emergencies (Sudmeier et al., 2013). That
negatively affected the economy and reduced business opportunities for construction
companies. Additionally, there were bankruptcies, which made it very difficult to obtain
financing and maintain positive cash flow (Pheng et al., 2010).
67
A study conducted by AT&T of 530 entities indicated that 83% of the business
leaders who responded indicated their entity had implemented a business continuity plan,
12% reported they did not have a plan and 5% were unsure (Jones, 2011). The preferred
solution is to have the right combination of internal controls and tools that will meet the
expectations of management in managing the different aspects of the business continuity
(Jones, 2011).
Summary
When an organization experiences a disruption of service because of a disaster or
other unexpected incident, it is the organization’s responsibility to ensure critical
functions will continue to operate during or after the incident (Cascardo, 2013). Today,
organizations, including the government, are more dependent on information technology.
The government sector would rely on business continuity planning to mitigate the impact
of such disruption. A large percentage of organizations today fail to understand how
business continuity planning could mitigate the impact of service disruptions.
The experiences of the BP oil spill, Hurricane Katrina in the United States, and
tsunamis give a clear indication that a disaster can occur at any time without any prior
warning (Ostrander & Lowry, 2012). The management of the government agency would
be expected to utilize the right resources to ensure proper implementation of the business
continuity planning. Implementation of business continuity planning requires an adept
knowledge of potential risks and their possible impact on the organization (Glendon,
2013). As a result, there is a need for an independent function whose responsibilities
would include informing management and the audit committee about the nature of risks,
68
the likelihood of the risks, the significant of the risks, and the conditions of the
organization’s preparedness.
The internal auditor usually understands the activities of the organization and is in
a position to provide assurance to management that the business continuity plan is
effective, key personnel are knowledgeable of the business continuity plan and of its
practical execution, and that it is cost-effective. The internal auditor is in an excellent
position to assist in the organization-wide business continuity planning (Sarens et al.,
2012).
There are a few studies on business continuity planning. For example, there was a
study on the role of the public sector asset manager in responding to climate change. The
study discussed the need for public asset managers to mitigate and prepare for future
events (Warren, 2010). Another study was an assessment exploration of strategic
business continuity planning methods in Michigan small business (Lasecki, 2009). But
none of the studies discussed the role of the internal auditor in business continuity
planning in the government sector.
69
Chapter 3: Research Method
This qualitative single-case study examined the use and the perceived roles of the
internal auditor in business continuity planning within the government sector. The
problem addressed by this study was the lack of the use and the limited understanding of
the perceived roles of the internal auditor in business continuity planning in the
government sector. The question that guided data collection and analysis for the present
study was:
RQ1. What are the perceived use and the roles of the internal auditor in business
continuity planning in the government sector?
The government sector is required to address any vulnerabilities that could have a
significant impact on operations (Adams, 2008). Exploring the roles of the internal
auditor in business continuity planning within the government sector included the
examination of planning, implementation, and maintenance of the business continuity
plan. As a result, the study necessitated employing the proper research design.
Governments have become more transparent and accountable to citizens. As a
result, government services have become more accessible, more efficient, and there is an
increased opportunity for citizens to participate in government. The advent of the
Internet has provided the government sector the opportunity to find ways of generating
more income locally and globally (Baird et al., 2012). Transactions such as taxes,
renewal of licenses, or registering to vote can be completed electronically. Additionally,
in the last few years, cyber-attacks have steadily increased against both United States
government agencies and private organizations (Melnik, 2015). To mitigate the impact
of any disaster or disruption of service, a government agency has to implement a business
70
continuity plan or an emergency plan (Hall et al., 2012). Inadequate preparation by the
government could have a significant negative impact on the agency and the public
(Haque et al., 2012). The internal auditor helps the government achieve its objectives of
serving the public by evaluating and improving the effectiveness of risk management.
To address the research questions posed for this study, a qualitative research
method was employed. Schram (2006) identified five qualitative research methods that
included narrative, grounded theory, phenomenology, ethnography, and case study. The
focus of narrative research is on exploring the life of people or an individual. Narrative
research method seeks to develop or build a theory about a specific issue or topic. It is
the qualitative equivalent to meta-synthesis, wherein qualitative information and findings
are summarized and analyzed to build and strengthen a theory being developed by the
study (Finlayson & Dixon, 2008). The method is more relevant when the focus is to
explore individual experiences, but not large numbers of anonymous participants. A
narrative research is usually used in biography research wherein the focus is on the
specific elements of a particular person (Essers, 2012).
The focus of phenomenology is on offering insight into how people or an
individual could make sense of a given phenomenon, in a specific context.
Phenomenology requires studying and analyzing several individuals who have shared
similar experiences. Phenomenology research is focused on ‘lived experiences’ of
participants to provide meaning to the phenomenon being studied. Phenomenology must
also be used by the researcher in a manner that portrays a special, open
phenomenological attitude (Finlay, 2009). It is only by combining these two criteria that
phenomenology can be successfully done. The method is common in the field of
71
philosophy and education. The individuals must be able to describe their experiences
fully. An example is an interaction between an instructor and a parent (Finlay, 2009).
The focus of grounded theory is developing a theory that is derived from and
grounded in data from the field. In essence, the goal is to generate a theory. Grounded
theory is best used when theory is not available to explain a process or phenomenon
(Finlay, 2009). Grounded theory, meanwhile, makes use of the substantive body of
grounded research toward a higher, more abstract level. Grounded theory means that the
researcher is required to comb through information about the issue or topic at hand to the
point of saturation that the results and finding were exhaustive enough for theory building
(Barnett-Page & Thomas, 2009).
The focus of ethnography is interpreting cultural behaviors. The method is more
relevant when it is used to describe cultural differences (Barnett-Page & Thomas, 2009).
In this method, specific components of an observed phenomenon are taken together as a
whole to arrive at a sufficient explanation, providing depth and dimension to the issue or
topic under study (Barnett-Page & Thomas, 2009). An example would be to describe
what people in Canada and the United States do in a given circumstance. The focus of a
case study is developing and analyzing one or two cases (Bowyer & Davis, 2012). Under
this approach, a topic of interest can be documented and studied in detail, specifically its
nature, dynamics, structure, processes, and culture.
Moreover, the case study approach is used to generate an in-depth, multi-faceted
understanding of a complex issue in its real-life context and it is also intrinsic,
instrumental, and collective (Crowe et al., 2011). A case study is an appropriate
approach to research if the case or issue is distinctive enough that it is worth documenting
72
and reviewing, providing a deep analysis of the issues at hand that, as Crowe et al. (2011)
defined, bring out the different facets or dimensions relevant to these issues. Vissak
(2010) provided a thorough analysis of the case study approach, specifically applied in
international business research. The author discussed how the case study method should
be conducted in business research, which, in the present study’s case, is about business
continuity. An example would be providing a case related to business continuity
planning and the perceived roles of the internal auditor. The case has now been fully
described and analyzed.
Research Methods and Design
This qualitative research is a single-case study. The utilization of a qualitative
methodology facilitated the understanding of the perceived roles of the internal auditor in
business continuity planning in the government sector. Qualitative methodology enabled
the researcher to collect data that systematically answered the research question, and
ultimately produced findings that could be used by the government sector. This case
study utilized purposive sampling. Adopting the case study method, the researcher was
able to gain insight, and as a result increased the credibility, integrity, and transferability
of data collection during the study. Additionally, the case study research methodology
appropriate for this study was useful in enhancing reliability and accuracy of the data
collected, by limiting inconsistencies resulting from individual interpretations of data
collection instruments including file artifacts (Yin, 2009). Moreover, qualitative research
has become one of the leading research strategies utilized by disaster researchers
(Rodriguez et al., 2007; Stallings, 2007). This methodology is also widely used within the
government sector, and several pertinent discoveries have emerged within the emergency
73
management arena due to the frequent use of qualitative research (Munro, 2011). Jones
(2010) used this me
Quantitative methodology pertains to experiments that are aimed at producing
internally valid, reliable, replicable, and findings that can be generalized. Therefore, this
method involves experiments that tend to mandate control of different variables utilizing
observations as a primary data collection tool (Yin, 2009). This study was not
experimental, rather interpretive with the primary purpose of an in-depth understanding
of the phenomenon researched (Yin, 2009), which involved no mandate to control
different variables. To ensure alignment with the research purpose and question, the
researcher utilized an interview questionnaire which comprised open-ended questions
(Patton, 2002). Additionally, this study included utilizing a small sample of participants
from a specific group. Therefore, quantitative methodology was not appropriate for the
study. Furthermore, this study did not include clarification of causation and relationship
among different variables, which are common in quantitative and mixed-methods
research. Therefore, qualitative methodology was best option because the goal of the
research study was not to draw a statistical inference based on the findings.
The primary strength of the case study methodology is the focus on a certain
phenomenon; but flexible for further exploration. The researcher’s focus was on the
theoretical framework and not on a large population. A purposive sampling technique
was used, and the participants were individuals (Yin, 2009).
A case study is usually data-coded and analyzed with statistics or patterns, which
involves understanding the perceived roles of the internal auditor in business continuity
planning within the government sector through the collection of raw data and the analysis
74
of the initial pattern (Glaser & Strauss, 1967). A case study can be past or future-based,
depending on the nature of the design (Glaser & Strauss, 1967). However, for the
purpose of the current study, the case study design utilized a past perspective to fully
understand the perceived roles of the internal auditor in business continuity planning
within the governmental sector, which generated new information for the future as a
framework for leaders of business continuity planning, as well as for agencies in business
continuity planning (Glaser & Strauss, 1967; Yin, 2009).
The target population for this study was internal auditors in the governmental
sector from the State of Texas in the United States. According to Glaser and Strauss
(1967), purposive sampling is most appropriate for case studies. Purposive convenience
sampling is the process of collecting data from a body of people who have experience
with the phenomenon under study and are available to the researcher to share their
perceptions and experiences (Jones, 2010). This research methodology provided a
reasonable assurance that data collected were reliable because of expected limited
variability of the interpretation of data collection device (Yin, 2009). Additionally,
qualitative research has been regarded as the ideal approach to business continuity and
disaster recovery studies (Stallings, 2007). Finally, many of the significant studies and
pertinent findings within the business continuity and crisis management field have used
qualitative research methodology (Munro, 2011).
Findings arising from the research were valid. To promote this, the researcher
avoided being biased by using a questionnaire and one-on-one interviews for all
participants (Shank, 2006). There was honesty about personal perspectives, and
transparency was exhibited as data were collected and analyzed. The researcher made
75
sure each participant was not pressured into participating in the research. An informed
consent form was signed by each participant prior to the interview (Drost, 2011).
Population
This study examined the roles of the internal auditor in business continuity
planning in the government sector. The study participants included government internal
auditors in the State of Texas agencies. In order to recruit participants, the researcher
obtained the list of internal auditors from the website of the Texas State Auditor’s Office.
The list included the names, phone numbers, and email addresses of the State of Texas
internal auditors working for the State of Texas agencies (Texas State Auditor’s Office,
2015). The total number of internal auditors for this study was 253.
The participants of this study were limited to government internal auditors
working for the State of Texas agencies and between 18 and 65 years of age. Individuals
who were not internal auditors, less than 18 and over 65 years, or not working for the
Texas State government were excluded from participating. Participants were selected
without consideration of their gender, age, and race. Following this criterion, the sample
size was 20.
Sample
The purpose of this study was to understand the perceived roles of the internal
auditor in business continuity planning in the government sector. Purposive sampling was
used to identify the individuals who were willing participate. This process entailed
identifying participants who were to share their perspectives and opinions on the subject
under study (Creswell, 2014). The researcher identified each participant by a code name.
Twenty internal auditors in the government sector working for the State of Texas
76
agencies were invited and considered as participants in this study. As emphasized by
Creswell (2014), qualitative studies require more focus and a smaller number of
participants than quantitative studies do. The researcher initiated contact with potential
participants through a phone. During that phone call, the researcher inquired if the
individual was between 18-65 years of age. If the potential participant met the age
requirement, within 24 hours, the researcher followed up with a recruitment email. Thus,
20 internal auditors were invited with the goal of interviewing 20 internal auditors in
State of Texas agencies. All 20 internal auditors were interviewed. This sample was
sufficient to provide valuable insights that were used to develop an understanding in the
field of research. Semi-structured interviews with the participants provided an
opportunity for obtaining deeper information about the roles of the internal auditor in
business continuity planning in the government sector (Palliyaguru, Amaratunga, &
Haigh, 2010).
Materials/Instruments
The primary instrument for collecting data for this qualitative study was the
researcher (Bryman & Bell, 2011). The researcher conducted one-on-one semi-structured
interviews using a questionnaire. The utilization of a questionnaire enabled the researcher
to collect the data necessary to answer the research question. The aim was to gather the
opinions and experiences of the study participants about the roles of the internal auditor
in business continuity planning in the government sector (Creswell, 2014). The
researcher conducted the interviews with the study participants using open-ended
questions (see Appendix F). The researcher developed the questionnaire after
considering the research questions and the primary focus of the study (Yin, 2009). The
77
open-ended questions enabled the participants to answer questions in their words on their
perceived roles of the internal auditor in business continuity planning in the government
sector.
The first three questions on the questionnaire addressed the significant negative
impact of disruptions when a government entity failed to mitigate a catastrophic event
due to a lack of proper business continuity planning that considered all risk factors
affecting the organization. The second three questions on the questionnaire addressed the
obstacles that could prevent an organization from properly involving the right expertise in
business continuity planning. The next set of questions in the questionnaire addressed the
major roles internal auditors play in an organization, especially in risk assessment. The
next set of questions addressed the areas in business continuity planning to be excluded
from the internal auditor, if internal auditors were involved in business continuity
planning. The last set of questions addressed how the internal auditor’s involvement in
business continuity planning affect his or her independence and objectivity. The reason
was that internal auditor was expected to audit all transactions of an organization,
including the business continuity planning.
Data Collection, Processing, and Analysis
After obtaining the approval of Institutional Review Board (IRB), the researcher
began initiating contact with the study participants. Using the list of internal auditors
from the website of the Texas State Auditor’s Office, the researcher identified the names,
phone numbers, and email addresses of the State of Texas internal auditors working for
the State of Texas agencies (Texas State Auditor’s Office, 2015). The researcher
purposively selected 20 potential subjects and contacted them via telephone using the
78
telephone script (see Appendix A). The researcher informed each individual about the
purpose of the study, age requirement, estimated duration of the interview, and that
participation was voluntary. After verifying the participants’ willingness to participate,
the researcher followed-up with an email reiterating what was discussed on the telephone
(see Appendix B). Each participant elected to do the interview via telephone. The
researcher emailed the informed consent form to each participant for signature (see
Appendix D). All 20 subjects contacted met the study criteria and agreed to participate.
Each interview lasted 30-45 minutes. Each participant was given the option of scanning
and emailing or faxing the signed informed consent form. After obtaining the signed
informed consent form, an interview date was scheduled. For each interview, the
researcher went over the questionnaire questions. All interviews were conducted over the
telephone. The research followed the protocol suggested by Yin (2009) regarding data
collection procedures, questions, and guide for the report. The protocol stressed the
reliability, validity, and credibility of the study Yin (2009). The internal auditor is
expected to demonstrate integrity, competence, and due professional care, objective and
free from undue influence (Seago, 2015).
Interviews served as the guide for data collection (Hartel & Latemore, 2011).
Data collected included interview narrative transcripts and code notes. Analysis of the
data help the management, internal auditors, oversight bodies of the government sector
under the perceived roles of the internal auditor in business continuity planning.
Additionally, the researcher prepared memos to ensure proper documentation of data
gathered. Consequently, a coding method for participants ensured confidentiality (Yin,
2009). The data collection lasted approximately 3 months. The researcher created
79
emergent codes that arose from the analysis of data. The codes were later broken down
into sub-codes. Additionally, the researcher jotted down notes of reactions that emerged
as a result of the interviews. The researcher used descriptive coding due to limited
experience in the use of qualitative data. The second cycle coding used by the researcher
was axial method due to the variety of data forms that emanated from the interview. The
axial coding process allowed the researcher to disaggregate data into themes and
provided an avenue for establishing different linkages and raising new questions for
further research (Elo & Kyngas, 2008).
Data analysis consisted reviewing the data collected via the interview
questionnaire, utilizing inductive content analysis to sort the information into themes,
aligning with the overarching research question, and maintaining internal validity. The
researcher did not use deductive content analysis due to a lack of previous research in this
area. The first phase of the data analysis was sorting data into themes and patterns for the
purposes of coding. The researcher classified, edited, analyzed, and interpreted the
themes to ensure credibility of the research. An Excel spreadsheet was used to
consolidate and categorize data.
Finally, the researcher developed the findings arising from the study which is in
chapter four of this document (Elo & Kyngas, 2008). Additionally, the researcher
interpreted data collected and came up with conclusions. Transcripts of the interviews
were reviewed by the participants and none provided additional comments or identified
issues with the accuracy of the transcript.
80
Assumptions
A major assumption of the single-case study was that the purposive sampling
from a targeted population could be considered a representative sample of government
internal auditors in the United States and their perceived roles in business continuity
planning. Participants are government internal auditors, and an assumption was that they
were not required by management or those charged with governance to participate in this
study. After selecting the sample size for the study, an assumption was that at all would
participate in this study if they had the time. Furthermore, the assumption was that the
participants would be sincere, credible, and open in responding to the interview
questionnaire; thereby enhancing the validity of the study (Patton, 2002; Yin, 2009). The
researcher, as a CPA and CISA, performed internal auditing outsourcing. As such, there
was an assumption during the analysis about the researcher’s objectivity in interpreting
findings and reducing the investigator’s bias (Yin, 2009). Another assumption was
selecting a qualitative study for the research problem (Yin, 2009), leading to the factors
outlined extensively in the literature review.
Limitations
This case study generated a lot of insight about the perceived roles of the internal
auditor in business continuity planning in the government sector. But the inquiry was
limited to those internal auditors working in the State of Texas. Therefore, the study was
inhibited by the experiences, knowledge, and perceptions of the participants. As a result,
the findings of the study might not meet the perceived expectations of past researchers of
reliability, credibility, transferability, and validity in the research design, data collection,
and data analysis process (Patton, 2002). Additionally, the findings might not apply to all
81
internal auditors in all government sectors. For example, the lack of the involvement of
the internal auditor in business continuity planning could be viewed as an unnecessary
step in risk management. Conversely, the involvement of the internal auditor could be
viewed as a required process to ensure all risks are adequately considered by the entity.
Nevertheless, the primary objective of the case study was not to generalize results across
all government agencies in the United States; rather, to fully understand the roles of the
internal auditor in business continuity planning in the government sector, specifically in
the State of Texas (Yin, 2009). Therefore, the generalization of any findings resulting
from this study would be at the prerogative of future researchers (Jones, 2010). Study
participants answered interview questionnaire representing an individual’s (internal
auditor’s) perception of the roles of the internal auditor in business continuity planning in
the government sector. Twenty participants were purposively sampled from a population
of 253. As a result, the purpose sampling methodology used could be subjective; due to
the small sample size used in gaining an in-depth understanding of the phenomenon
studied and an analysis of large amount of data generated from the research (Yin, 2009).
Delimitations
The study of the roles of the internal auditor in the government sector was a
significant assignment. Delimitations were the boundaries of this research study. They
were vital in narrowing the scope of the research, which was to understand the perceived
roles of the internal auditor in business continuity planning in the government sector. A
delimitation was the single-case study research design using purposive sampling;
judgmentally selecting a sample of individuals from a population (Yin, 2009), a
representative of internal auditors working in the government sector. The choice for data
82
collection was a questionnaire used in interviewing selected individuals. There was no
effort to try to generalize the findings of the study to larger populations. Therefore, the
context and geographic area of the study was appropriate in understanding the perceived
roles of the internal auditor in business continuity planning in the government sector.
Ethical Assurances
One of the goals of this research was to use measurements that were reliable or
consistent. Since there was no simple or one way to measure the reliability of data
collected, the researcher asked several different questions to try to achieve the object of
the research questions. To promote reliability of information, the researcher asked for
clarification whenever determined necessary, just to make sure that the interviewee’s
response was understood. It was also important to make sure that measurements were
valid or accurate. To ensure that interviews were conducted similarly across different
participants, the researcher ensured each participant was asked the same set of questions.
Thus, semi-structured interviews were used to ensure that the interview process was
guided. Information obtained was reported accurately. The researcher only employed
triangulation whenever necessary by using a variety of mixes such as interviewing,
document analysis, and questionnaires with open-ended questions. The researcher
documented the source of data being collected, how it was collected, and how it was
used. That ensured a proper audit trail. The researcher ensured the credibility of data by
maintaining an extended contact with the respondents. Credibility was improved when
data collected from different sources reflected the same findings (Drost, 2011).
Findings should be valid. To promote this, the researcher tried to avoid being
grounded in own context and personal perspective (Shank, 2006). There was honesty
83
about personal perspectives and transparency was exhibited as data were collected and
analyzed. To adequately address the research question, a part of validating the work
involved embracing the concept of a representative sample (Drost, 2011).
Obviously, it was not practical to interview everyone about the roles of the
internal auditor in business continuity planning in the government sector. As a result, the
people being targeted were a representative sample of the population affected by the topic
under study. The researcher sampled different groups of people. Drost (2011) argued
that if the same results were obtained, it would be natural to extend the sample to the
population at large. That helped simplify an understanding of the phenomenon under
study and further validated the results of the work.
The idea was to demonstrate that the study can be trusted. Things considered
included consequences of presence in a setting, selective experience, and engaged
subjectivity. Presence in the field was explored including its impact on the credibility of
the research. Other considerations included addressing the necessity of attending to some
things but not others; and managing and monitoring the subjectivity that influenced the
research (Schram, 2006). To ensure the integrity of the research, other possibilities were
explored, and those possibilities were supported by the data collected. The researcher
fully disclosed the purpose of the study. That was one of the ethics and morality of
conducting research. Some researchers believe that the quality of the data gathered may
be enhanced by overtly soliciting the cooperation of everyone associated with the subject
under study. As a result, they argue that the ultimate acceptance and usefulness of
formative information might depend on such prior disclosure and agreement. Related to
full disclosure is confidentiality. The report concealed names, locations, and other
84
identifying information so that people who had been observed or interviewed was
protected from harm or punitive action. The researcher sought and obtained an Informed
Consent Form or Certificate of Confidentiality (Bryman & Bell, 2011; Rubin & Rubin,
2012).
Prior to interviewing, the researcher for this study outlined a set of issues that
were to be explored with each respondent. That was more of informal, conversational
interviews. The interview guide (see Appendix E) served as a basic checklist during the
interview to make sure that all relevant topics were covered. The researcher was
expected to interview up to 20 people. The researcher interviewed 20 people. Each
interview varied between 30 minutes to 45 minutes, using a questionnaire (see Appendix
F). There were notes as well and memoranda written during the interviews.
Summary
The problem to be addressed by this study was the lack of the use and the limited
understanding of the perceived roles of the internal auditor in business continuity
planning in the government sector. The government sector is required to address any
vulnerabilities that could have a significant impact on operations (Adams, 2008). To
address the research questions posed for this study, a qualitative research method was
employed. The case study approach is used to generate an in-depth, multi-faceted
understanding of a complex issue in its real-life context and it is also intrinsic,
instrumental, and collective (Crowe et al., 2011). This qualitative research is a single-case
study. This case study utilized purposive sampling. The researcher selected, 20 internal
auditors working in the State of Texas agencies to participate in the study. The research
followed the protocol suggested by Yin (2009) regarding data collection procedures,
85
questions, and guide for the report. The protocol stressed the reliability, validity, and
credibility of the study Yin (2009). Data analysis consisted reviewing the data collected
via the interview questionnaire, utilizing inductive content analysis to sort the
information into themes, aligning with the overarching research question, and
maintaining internal validity. The assumption was that the participants would be sincere,
credible, and open in responding to the interview questionnaire; thereby enhancing the
validity of the study. A limitation of the study was that the inquiry was limited to those
internal auditors working in the State of Texas. Therefore, the study was inhibited by the
experiences, knowledge, and perceptions of the participants. As a result, the findings of
the study might not meet the perceived expectations of past researchers of reliability,
credibility, transferability, and validity in the research design, data collection, and data
analysis process. A delimitation was the single-case study research design using
purposive sampling; judgmentally selecting a sample of individuals from a population
(Yin, 2009), a representative of internal auditors working in the government sector. The
choice for data collection was a questionnaire used in interviewing selected individuals.
Data analysis consisted reviewing the data collected via the interview questionnaire,
utilizing inductive content analysis to sort the information into themes, aligning with the
overarching research question, and maintaining internal validity. The researcher fully
disclosed the purpose of the study; one of the ethics and morality of conducting research.
86
Chapter 4: Findings
The problem this study explored was the lack of the use and the limited
understanding of the perceived roles of the internal auditor in business continuity
planning in the government sector. Governments oftentimes worry about continuity as
they are under pressure to keep up with the citizen’s expectations for optimal services.
As a result, a government agency is expected to implement a plan to be followed should
an emergency arises (Hall et al., 2012). An adequately implemented plan minimizes the
impact of disruption and ensures the quick resumption of operations. Without the
involvement of an independent person who understands risk evaluation during the
development and implementation of business continuity planning, management of a
government agency could assume undesirable business continuity risks. Thus, the
primary focus of this was to understand the use and the perceived roles of the internal
auditor in business continuity planning within the government sector. The single
overarching research question that guided this study was the following:
RQ. What are the perceived use and the roles of the internal auditor in business
continuity planning?
This chapter outlines the findings arising from an analysis of the data collected
with the goal of answering the research question. The subsequent section outlines the
findings noted in relation to the theoretical framework. The next section outlines the
results of the analysis arising from this study and comparison to previous studies.
Finally, an extensive evaluation of the findings arising from this study and its impact on
business continuity planning and internal auditing is presented.
87
Results
To maintain the anonymity of the study participants, the researcher assigned
unique identifiers to each participant. The individual identifier consists of 1-20 numeric
numbers. The identifier is used to trace data back to the specific participant.
Additionally, the identifier is used to protect the identity of those who participated in the
study.
The research required the reviews of the role of the internal auditor in an
organization as defined by the Institute of Internal Auditor’s International Standards for
the Practice of Internal Auditing, the laws establishing the internal audit function and
business continuity planning, specifically in the State of Texas, and the business
continuity guide published by the Texas State Office of Risk Management. The purpose
of the business continuity guide is to ensure that State of Texas agencies can perform its
essential functions under all conditions.
Obtaining the business continuity planning guide and the law was very simple
owning to the information being publicly available on pertinent websites. The researcher
was also able to obtain the names, phone numbers, and email addresses of the State of
Texas internal auditors from the website of the Texas State Auditor’s Office. A total of
20 participants were interviewed using a questionnaire. Interviews with the participants
were not complicated. Overall, the internal auditors contacted were willing to support the
study, except for a few who had pressing work issues and could not participate.
Additionally, a few other potential participants could not be reached possibly because of
other commitments. Eventually, the researcher was able to interview 20 internal auditors
in the government sector within the State of Texas. While conducting the interviews, the
88
participants spoke freely and answered all questions without any resistance. The research
identified five themes during the analysis: (a) significant negative impact, (b) obstacles,
(c) major roles, (d) areas to be excluded from the internal auditor, and (e) internal
auditor’s independence (see Table 1).
Theme 1. The significant negative impact of a lack of proper business continuity
planning for a government sector if a disruption occurs.
Theme 2. The obstacles that might get in the way of dealing with disruptions
successfully.
Theme 3. The major roles the internal auditor plays in an organization, especially
the government.
Theme 4. The areas within business continuity planning the internal auditor
should be excluded, if the internal auditor were to be involved in business continuity
planning.
Theme 5. The threat to the internal auditor’s independence, due to the
involvement in business continuity planning.
Table 1
Themes for Research Question
Theme Frequency Percent
Significant Negative Impact 20 100
Obstacles 18 90
Major Roles 19 95
Areas to Be Excluded From The Internal Auditor 20 100
Internal Auditor’s Independence 20 100
Note: n = 20
89
Demographic characteristics. All 20 participants are internal auditors in the
government sector in the State of Texas and between the ages of 18 and 65.
Research question. The question that guided the collection and analysis of data
were; “What are the perceived use and the roles of the internal auditor in business
continuity planning. There were 5 themes that arose from the analysis.
Theme 1: Significant negative impact. All participants (20) emphasized that a
disruption of service would have a significant impact on the government sector on
account of federal and statutory mandates. They opined that government agencies are
expected to provide services to the public, under any condition. Additionally, they all
argued that confidential and sensitive data might be lost, and resources such as people
and processing environment and associated costs would be negatively affected if there
was a disruption. Participants believed there was no alternative for business continuity
planning in the government sector and cannot foresee a public sector’s long time success
without business continuity planning. Participant 10 summarized:
As with any business including government agencies, if you don’t have a plan,
then chances are when something goes bad, it will be much harder to get back to
where you are. There should be known consequences on what could potentially
happen and a plan in place on what to do if it does occur. It is much better to be
ahead of the curve instead of reactionary. If prepared, will cost less, will be back
to normal (or as close depending on disruption) sooner, and public perception
could be positive versus potentially negative. (Participant 10, personal
communication, March 15, 2016)
90
Participant 6 reasoned that disruption could have a significant impact on critical
services, especially “those in healthcare, safety, and state hospitals, and jails.”
Participant 2 affirmed that business continuity planning in the government sector helps to
“shorten the duration of the disruption, have a plan of action for various types of
disruption” and Participant 7 asserted “We are established by the public to provide
services for the public, whether or not there is a disruption.” The planning might include
third party agreements, manual workarounds, systemic redundancies, cross-training,
back-ups, and transfer of risk with insurance policies. But business continuity planning
covers more activities to ensure a government sector succeeds. Participant 8 believed:
An organization needs to prepare for a disruption before it occurs to ensure they
are prepared for that disruption. If an organization is providing critical services to
the public (public safety, protective services, public assistance, etc.), it is not
reasonable to stop providing services until the entire organization is able to
recover. Frequently these critical services must be resumed within a matter of
hours and not days or weeks. (Participant 8, personal communication, March 1,
2016)
Additionally, Participant 12 supplemented:
In addition, with the rise of cyber-attacks, terrorism, and natural disaster, such as
earthquakes, tornadoes, floods, etc, preparing ahead of time has quickly come to
the forefront to ensure the agency has an idea of what might happen to overall
operations and what steps need to be taken to counteract any type of disruption.
(Participant 12, personal communication, March 23, 2016)
91
Based on the responses from the participants, the researcher identified a sub-
theme related to theme (a):
Sub-theme 1. This referred to the negative impact of a lack of proper business
continuity planning. The negative impact might include the loss of data. Additionally
long-term success of the organization could be hampered. There could be health and
safety issues. Resources such as revenue, people, facility, and equipment might be
affected. The organization might be able to provide critical services, and protective
services and public assistance might impacted, if an organization lacked proper business
continuity planning (see Table 2).
Table 2
Significant negative impact
Negative impact
Loss of data Resources affected
Long-term success hampered Critical services affected
Health and Safety affected Protective services and public assistance
Theme 2: Obstacles. Nineteen of the participants (95%) described the obstacles
that get in the way of dealing with disruptions successfully. Some agencies fail properly
to conduct a complete analysis of potential disruptions or risks, and as a result, are unable
to assess current risk mitigation strategies. As a result, there is little or no consideration
of risks that could impede the government sector’s ability successfully to minimize the
impact of disruptions (Participants 9, 10, 12, 13 & 20). Participant 9 stated, that one of
the obstacles is “all the risks not being considered.” Additionally, the information used in
business impact analysis lacked currency and was not aligned with the agency’s mission
92
and objectives (Participant 13). Additionally, one of the obstacles was the failure to have
a plan of action in place (Participants 2, 6, 8, 11, 12, 13, 16, & 20). Participant 2
indicated “lack of planning” as an obstacle. Other obstacles included the lack of
adequate resources properly in planning business continuity (Participants 6, 7, 9, 10, 16,
18, & 19). Participant 10 opined obstacles included “high-level staff understanding of
what could happen, perception that it won’t happen so don’t need a plan,” and in
addition, Participant 19 asserted that obstacles included “the perception that disruption
will never happen. Cost, time, and other resources.” Another obstacle mentioned was
the lack of testing of the business continuity plan (Participants 1, 9, 13, & 17).
Participant 17 believed “Continuity of Operation and Disaster Recovery Plans are seldom
fully tested to validate their viability.” Participant 13 summarized that the perceived
elements or lack of elements that get in the way of dealing with disruptions successfully
include:
Improper planning or not having a continuity plan in place, business continuity
procedures not tested at least annually or testing performed is not sufficient, staff
not appropriately training on what to do in the event of a disruption, risk
assessment fails to identify a potential disruption, critical data, systems, or
processes are not defined, and information used in business impact analysis is not
current or does not align with the organization’s mission and objectives.
(Participant 13, personal communication, March 15, 2016)
There is also the lack of commitment and the perception that a disruption will
never happen (Participants 1, 10, 16, & 19). Some organizations do not follow
established communication protocols or are inept at sharing information (Participants 2,
93
10, & 12). Participant 10 reasoned one of the obstacles was “the lack of communication
with everyone on how, what, when, who is responsible, etc. on if disruption occurs.”
Another major issue was assigning inept personnel to deal with disruptions (Participants
2, 4, 5, & 9). Participant 2 stated that one of the obstacles was ‘the right personnel not
being involved in the process.” Many organizations do not adequately train staff on what
to do in the event of a disruption; critical data, systems, or processes are not defined
(Participants 2, 12, & 13). Some participants reported that some key stakeholders and
process owners do not have business continuity planning as a priority compared to other
business objectives within the government agency (Participants 6, 9, 11, 17, 18).
Two participants believed management would not want the internal auditor to be
involved with business continuity planning owing to threats to independence (Participant
3 & 12). Participant 12 stated, “Management may be concerned that Internal Audit is just
to give them findings or they may be concerned that Internal Audit’s participation could
impair their independence affecting the ability to audit the BCP [business continuation
plan] and processes in the future.” Seven participants (35%) believed management
would be leery about getting the internal auditors’ perspective in the development and
implementation of business continuity planning because they would not provide value
because of knowledge gaps and that the internal auditors would get in their way of their
planning. Another participant reasoned that the internal auditor might not have a strong
working relationship with individuals in different business units just because they are
auditors and are always scavenging for mistakes that could result in future audits.
Participant 2 stated, “Management could want to keep the internal auditor out of the
planning process if there are gaps that management knows exist.” Therefore,
94
management might not be receptive to the internal auditor’s participation since that might
create more issues. One participant opined that management’s lack of awareness of the
internal auditor’s role in the organization could result in not involving them in business
continuity planning (Participant 12). Participant 12 specifically indicated “top decision
makers are not identified with both roles and appropriate authority defined.”
Sub-theme 2. This referred to the obstacles that get in the way of dealing with
disruptions successfully. There might be failure to conduct analysis of risk affecting the
organization. An organization might have a plan but never practiced it. There could be
sentiment that a disaster would not happen, the internal auditor would be provide value,
there might be knowledge gap between management and staff of an organization and the
internal auditor in terms prioritizing risks affecting the organization. An organization’s
risk assessment might be current or not even have a plan in place. There could be a lack
of resources to implement a plan. There might be lack of training, and inept people
entrusted with plan, lack of communication , poor relationship with staff, and threat to the
independence of the internal auditor (see Table 3).
Table 3
The obstacles that get in the way of dealing with disruptions successfully
Obstacles
Failure to conduct risk analysis Failure to have a plan in place
Plan exists but not practiced Lack of resources to properly plan
Disaster is not going to happen Lack of training
Not high on priority list Threat to independence and other issues
Internal Auditor is not providing value Inept people entrusted to plan
Knowledge of gap Lack of communication
Lack of currency or alignment Poor relationship with staff
95
Theme 3: Major roles. Nineteen of the participants (95%) believed the internal
auditor should play a major role in business continuity planning in the government sector.
They reasoned that the internal auditor has a broader and more independent view of the
organization and could provide valuable insight on areas that are at risk. Ten of the
participants (50%) indicated that the internal auditor should be involved because of their
experience in risk identification and objectivity in assessing risks (Participants 2, 5, 7, 8,
10, 12, 13, 14, 17, & 18). Participant 2 believed
The internal auditor has a broad view of operations and could provide gap
analysis to ensure all facets are covered. The internal auditor could also provide
insight on areas that have been audited in the past that are at risk for business
continuity planning.
Participant 18 stated,” Internal Audit are control experts and could help identify key
business continuity risk and control gaps.” Participant 12 added:
Internal Audit can assist by reviewing the risk assessment/analysis for overall
adequacy and appropriateness, can assist with BIA, and can audit/evaluate the
plan to identify weaknesses and ensure it is up to date and relevant. Overall,
Internal Audit plays a critical role in offering objective feedback by assessing
whether the program provides effective coverage to protect the agency from harm
before/when a significant disaster occurs. (Participant 12, personal
communication, March 23, 2016)
Six participants (30%) emphasized that internal auditors understand the entire
organization on account of their roles due to their roles. As a result, they understand risks
that might be neglected by management and are in a position to provide some pointers to
96
management (Participants 1, 2, 5, 7, 10, &14). Participant 7 indicated “Internal Auditor
understands risks that may be overlooked by management. Understands the entire
organization and can provide some pointers to management.”
Several participants also reasoned that the internal auditor position ensures that
the business continuity planning process is adequately planned, in place, and provides for
periodic testing (participants 3, 4, 6, 7, 9, 10, 11, 12, 14, 15, 16, 19 & 20). Participant
asserted “Internal Auditor can provide an unbiased, objective opinion on the risk.” One
participant indicated that the internal auditor should assist management by reviewing the
risk assessment, overall adequacy, and appropriateness of the business continuity plan.
Because of their enterprise-wide risk perspective, the internal auditors can help inform
those charged with governance regarding the government entity’s data, systems, and
processes that are critical and should be protected (Participant 17). One participant
argued that the internal auditor does not necessarily have to participate in the
development of business continuity planning, but reasoned that in the absence of strong
continuity structure, it is the responsibility of the business area to determine risk, but if
the entity does not address the risk then the internal auditor has to identify risk
(Participant 8).
Sub-theme 3. This referred to the reason for the internal audit to play major roles
in business continuity planning. The internal auditor understands the organization well,
risks, and risk assessment, provides assurance to management and board, has a broader of
the organization, and is expected to be objective and independent in his or her view of the
organization (see Table 4).
97
Table 4
The reason for the internal auditor to play major roles in business continuity planning
Major roles
Understands the organization well Understanding of risks
Objective independent view Assurance to management and board
Understands risk assessment Broad view of organization
Theme 4: Areas to be excluded from the internal auditor. All participants
believed the internal auditor should not be involved in making management decisions
related to business continuity planning. They should only participate in an advisory
capacity. All participants reasoned that the internal auditor could provide an unbiased
opinion during business continuity planning since they are considered control experts.
There were reminders that internal auditors have the expertise in risk assessment and
mitigation owing to their overall knowledge of the organization. As a result, they are in a
position to validate the information provided by various sections of the government
sector by identifying key business risks and control gaps performing an audit process
when necessary, in addition to assisting executive management in identifying priorities
that impact the organization (Participants 2, 5, 7, 8, 10, 12, 13, 14, 17, & 18). Participant
13 stated:
Internal Auditors should be consulted to assist in identifying risk and control
information to perform business impact analysis. In addition, Internal Audit staff
may conduct assurance or advisory engagements before, during, and after an
interruption to assess the effectiveness of business continuity planning.
(Participant 13, personal communication, March 15, 2016)
98
A participant identified the steps to be considered in the development and
implementation of business continuity planning which might consist of defining critical
functions, identifying risks and strategies for mitigating those risks, prioritization of
critical services, the identification of resources necessary to deploy those services,
evaluating different recovery strategies, implementing, testing and maintaining the plan.
The participant indicated that these could be completed without the assistance of the
internal auditor of the organization, but “probably not the wisest thing to do. The internal
auditor’s input is essential to ensure all risks are considered” (Participant 19, personal
communication, March 17, 2016). Participant 2, 5, 7, and 18 indicated that update and
maintenance of the business continuity plan should be completed by management or staff
other than the internal auditor because they are considered management functions
Participant 5 opined “If the internal auditor should be excluded from any activity, I would
suggest update and maintenance as that is truly an operational activity” and Participant 18
added that internal auditor should be excluded from “update and maintenance of the plan
as internal audit would then become part of control.” Participants 2, 11 and 16 believed
disaster recovery and strategy should be completed by management and staff other than
the internal auditor since they are considered management functions (Participants 2, 11,
& 16). Participant 2 stated,
The internal auditor should be involved in the analysis and testing phases as they
are areas that can provide better objective insight to management. Disaster
recovery plan and update and maintenance are more of a management function
and not an assessment function.
99
Two participants also believed that the business impact analysis should be completed by
management or staff other than the internal auditors because it is considered a
management function. But the internal auditor should provide critical consulting roles in
these areas to ensure objectivity so that the planning process is more efficient and
effective owing to the wealth of knowledge in performing risk assessment and identifying
risks, and help validate, mitigate, diffuse intra-agency competing interests, and provide
objective information to executive management and those charged with governance
(Participants 4 &17). Participant 17 summarized:
We must ensure our independence by not developing the plans or getting involved
in management decisions. Our role should be one of review and assessment,
providing management with information by which they can make informed
decisions. The biggest risk to an organization for not involving the internal
auditor in business continuity planning is that professional and independent
resources are not taken advantage of. The unbiased, third-party perspective can
help management make informed decisions, and perhaps diffuse internal, cross-
organizational conflict. (Participant 17, personal communication, March 8, 2016)
Sub-theme 4. This referred to the areas in business continuity planning the internal
auditor should be excluded if they were to be involved in business continuity planning.
The internal auditor should be excluded from making management decisions,
participating in business impact analysis, updating and maintenance of the plan, and
disaster recovery and strategy. These areas should be the responsibility of management
(see Table 5).
100
Table 5
The areas the internal auditor should be excluded
Areas to be excluded
Making management decisions Update and maintenance
Business impact analysis Disaster recovery and strategy
Theme 5: Internal auditor’s independence. All participants agreed that the
independence of the internal auditor would not be impaired due to participation in
business continuity planning. They argued, however, that there could be a threat to
independence depending on the role of the internal auditor. They all believe the best
safeguard would be to have an understanding up front with the management of the
government sector outlining the roles of the internal auditor as a consultant, not as
someone making decisions for management, in the process. Participant 2 stated:
One of the necessary safeguards to mitigate the impairment of independence is to
ensure that there is a consulting agreement or Memorandum of Understanding to
identify roles that the internal auditor will play in the process. Ensure that the
internal auditor is providing only assurance services and not participating in
management functions. (Participant 2, personal communication, March 17, 2016)
Additionally, Participant 18 emphasized the importance of instituting necessary
safeguards to ensure mitigation of impairment of independence:
There should be clear statement of work that is documented and communicated to
executive management. Internal Auditor cannot be responsible for the business
continuity plan including being part of the process or determining which business
101
operations should take priority. (Participant 18, personal communication, March
26, 2016)
One participant stated that “the auditor should never direct the group in a specific
direction (make a decision), but instead provide information that the group can use to
make their own decisions” (Participant 6). The participant added that roles should be
“here is the process you should consider performing” in lieu of “here is the process you
should use and here is the format you should use” (Participant 6).
Thirteen participants (65%) believed the reactions of those charged with
governance could be negative or positive, depending on their understanding of the roles
of the internal auditor in business continuity planning within the government sector. But
they suggested that it is the duty of the internal auditor to explain to management and
those charged with governance why the internal auditor should play a role in business
continuity planning (Participants 1, 2, 3, 4, 5, 7, 8, 10, 11, 12, 14, 15,16, & 19).
Participant 5 stated, “Those charged with governance might be surprised because they
have preconceptions about the role of internal audit.” Participant 15 stated “It is up to
Internal Audit to explain to senior management why internal audit should have a role.
They can then agree to what those roles will be if it is an advisory versus an assurance
service.” Participant 16 stated, “It is the duty of the Internal Auditor to point
management and those charged with governance to the Internal Audit Charter which
spells out the responsibilities of the Internal Auditor.” Six participants (30%) believed
those charged with governance should welcome the knowledge of the internal auditor and
the assurance that the plan is appropriate (Participants 1, 9, 12, 16, 17 & 18). On the
other hand, Participant 18 stated: “Those charged with governance would have positive
102
reactions due to the greater level of assurance that the plan is appropriate and sufficient
through an independent assessment.” Participant 12 stated, “They may feel a sense of
assurance that the plan was developed based on relevant risks and analysis, (if audited)
that the plan is complete and adequate, and that they are informed on the progress, etc.”
Sub-theme 5. This referred to the independence of the internal auditors in an
organization. The board welcomes the independence of the internal auditor. Also, the
business continuity plan is usually developed based on risk identification and analysis.
However, there could be a threat to the independence of the internal auditor for
participating in business continuity planning. As a result, the internal auditor’s
participation might or might not resonate well with the board. The internal auditor would
mitigate the impairment of independence by using a Memorandum of Understanding
(M.O.U) signed between management and the internal auditor prior to participating in
business continuity planning (see Table 6).
Table 6
Independence of the internal auditor
Independence
Independence not impaired if M.O.U Threat to independence
Positive reactions by the board Board welcomes independence
Positive and Negative reaction by board Plan developed based on risk
Evaluation of Findings
In this section, the findings arising from this study are evaluated. First, the
findings were appraised in light of current theory. This study and findings were
compared to past research. Finally, how business continuity planning is affected by this
103
research is presented. Analysis of the data resulted in the manifestation of five themes.
The themes were (a) significant negative impact, (b) obstacles, (c) major roles, (d) areas
to be excluded from the internal auditor, and (e) internal auditor’s independence. The
following is an evaluation of theme findings in comparison and contrast with current
research studies.
RQ. What are the perceived use and the roles of the internal auditor in business
continuity planning in the government sector?
Theme 1: Significant negative impact. When a government sector falls short of
implementing the required and appropriate measures to mitigate disruptions, the potential
risks can be great (Hall et al., 2012). This failure might result in an ill-advised response
to an emergency and the possible use of limited resources improperly (DHS, 2006; Ojha
et al., 2013). Evidence from this theme indicates that organizations are concerned about
people, property damage, and monetary loss, but not enough attention is given to
confidential and sensitive information that can potentially lead to negative exposure
(Ojha et al., 2013; Verchick & Hall, 2011).
Sub-theme 1. When asked to about the negative impact of a lack of proper
business continuity planning, some participants indicated that there might be the loss of
data. Additionally, long-term success of the organization could be hampered. There could
be health and safety issues. Resources such as revenue, people, facility, and equipment
might be affected. The organization might be able to provide critical services, and
protective services and public assistance might be impacted, if an organization lacked
proper business continuity planning.
104
Theme 2: Obstacles. Some organizations fail properly to conduct a complete
analysis of potential disruptions or risks, and as a result, they are unable to assess current
risk mitigation strategies event (Raman et al., 2011). The current study found that some
government agencies do not consider risks that could impede the government sector’s
ability to mitigate the impact of disruption successfully. Additionally, one of the
obstacles was the failure to have a plan of action in place and lack of resources to
properly plan business continuity and that business continuity plans are seldom tested
(Chandra et al., 2013).
Sub-theme 2. When asked about the obstacles that get in the way of dealing with
disruptions successfully, findings from the current study also indicated that there is a lack
of commitment, perceptions that disruption will not happen, improper communication,
and inept personnel being assigned to deal with disruptions. Participant 9 stated, “The
right personnel are being involved in business continuity planning.” The findings
additionally indicated that some key stakeholders and process owners did not have
business continuity planning as a main concern compared to other business objectives
within the government agency. Participant 6 opined, “I think some organizations
including government agencies lack planning properly for disruptions and do not regard
business continuity planning as important as other issues.” Additionally, the information
used in business impact analysis lacked currency and was not aligned with the agency’s
mission and objectives. The findings further indicated that management of an
organization including the government sector would not want the internal auditor to be
involved with business continuity planning owing to threats to independence. Finally, the
findings indicated that management would be leery about getting the internal auditors’
105
perspective in the development and implementation of business continuity planning
because they would not provide value because of knowledge gaps and internal auditors
getting in the way of their planning.
Four participants believed management would not want to involve the internal
auditor in business continuity planning because of threats to the internal auditor’s
independence. Another participant reasoned that the internal auditor might not have a
strong working relationship with individuals in different business units just because they
are auditors and are always scavenging for mistakes that could result in future audits.
Therefore, management might not be receptive to the internal auditor’s participation as
that would create more issues. One participant opined that management’s lack of
awareness of the internal auditor’s role in the organization could result in not involving
them in business continuity planning (Kanellou & Spathis, 2011; Soh & Martinov-
Bennie, 2011).
Theme 3: Major roles. Findings indicated that the internal auditor should play a
major role in business continuity planning in the government sector. They reasoned that
the internal auditor has a broader view of the organization and could provide valuable
independent insight to management and those charged with governance in areas that are
at risk (Schneider et al., 2012; Stefaniak et al., 2012; García et al., 2012). The internal
auditor who performs auditing of all the activities of an organization should be in a better
position to understand the functions of the governmental entity and can provide
independent information regarding risks and the effectiveness of the business continuity
plans and whether or not the cost is effective (Chambers, 2014; Dickey et al., 2006; Zain,
106
Zaman, & Mohamed, 2015). As such, the internal auditor is considered a significant part
of an organization’s internal control structure (Wines, 2012; Zerni, 2012).
Sub-theme 3. When asked about the reason for the internal audit to play major
roles in business continuity planning. The participants overwhelming indicated that the
internal auditor understands the organization well, risks, and risk assessment, provides
assurance to management and board, has a broader of the organization, and is expected to
be objective and independent in his or her view of the organization.
Theme 4: Areas to be excluded from the internal auditor. Current research
indicated that there are specific areas in business continuity planning within the
government sector from which the internal auditor should be excluded. They included
identifying risks and strategies for mitigating those risks, prioritization of critical
services, the identification of resources necessary to deploy those services, evaluating
different recovery strategies, implementing, testing and maintaining the plan. In these
cases, the internal auditor should be used as an advisor because of their overall
understanding of the risks facing the organization. In essence, one of the internal
auditor’s primary role is assessing and evaluating risk within the organization (Dickins &
Daughterty, 2012; Novriansa, & Riyanto, 2016). Participant 8 stated, “Internal auditors
should provide options that they are aware of, but should not recommend a specific
option.”
Sub-theme 4. When asked about the areas in business continuity planning the
internal auditor should be excluded if they were to be involved in business continuity
planning. The participant expressed their sentiments that the internal auditor should be
excluded from making management decisions, participating in business impact analysis,
107
updating and maintenance of the plan, and disaster recovery and strategy. These areas
should be the responsibility of management.
Theme 5: Internal auditor’s independence. Findings from the current study
indicated that the independence of the internal auditor would not be impaired on account
of participation in business continuity planning. There could be a threat to the
independence of the internal auditor, however, depending on the role the auditor played
in business continuity planning. As a safeguard against the impairment of the internal
auditor’s independence, there should be an understanding up front with the management
of the government sector outlining roles of the internal auditor as a consultant, not as
someone making decisions for management. In essence, the internal auditor’s role is to
assess and evaluate risks, not making decisions for management which ultimately could
impair the independence of the internal auditor (Abbott, Daugherty, Parker, & Peters,
2016; D’Onza, Selim, Melville, & Allegrini, 2015; Zaharia et al., 2014).
Sub-theme 5. When asked how the internal auditor’s independence would be
affected if allowed to participate in business continuity planning, the participants opined
that the independence of the internal auditors is vital in an organization, even though the
business continuity were based on risk identification and analysis . Although the board
welcomes the independence of the internal auditor, there could be a threat to the
independence of the internal auditor for participating in business continuity planning. As
a result, the internal auditor’s participation might or might not resonate well with the
board. The participants expressed confidence that the internal auditor would mitigate the
impairment of independence by using a Memorandum of Understanding (M.O.U) signed
108
between management and the internal auditor prior to participating in business continuity
planning.
Comparison to past research. Past literature supported the importance of
business continuity planning to ensure that the government sector is ready to respond to a
service disruption or emergency. Additionally, the negative effects of a service
disruption or disaster can be significant to the government sector, which might include
casualties or even death, negative public perception, property damage, and monetary loss
(Day, Melnyk, Larson, Davis, & Whybark, 2012; Haddow et al., 2011). Therefore, when
proper skills and knowledge are not used to ensure continuity of business, there is the risk
of unsuccessful response to a disaster, and potentially significant losses (Haque et al.,
2012; Kusumasari et al., 2010).
Findings from the current study also indicated that the government sector does not
consider risks that could impede the government sector’s ability to mitigate the impact of
disruptions successfully. This assertion contrasts with past research which showed that
the government considers different types of risks. Additionally, sometimes staff are not
adequately trained on what to do in the event of an emergency (Chen, & Lee, 2012).
Past research focused on the risks facing organizations today. For example, there
were risks related to natural disasters such as wind, hail tornadoes, and lightning
(Goudsmit, 2012). There were past findings on the need for public asset managers to
mitigate and prepare for future, business continuity planning management in local
governments, an exploration on business continuity planning in Michigan small
businesses, how to ensure continuity of business in general small and medium businesses,
109
and on education technology (Botha & von Solms, 2004; Lasecki, 2009; Mekdeci, 2011;
Smit, 2005; Warren, 2010).
Past research also supported the findings in the current study which included
developing and implementing a business continuity plan to mitigate potential loss
through the identification, prioritization, and safeguarding of critical assets of the
business, not only information technology (Hoong & Marthandan, 2014). Additionally,
there were studies supporting the findings in the current study that internal auditors
understand and have a broader view of potential risks affecting the organization and the
potential impact of any loss (Schneider et al., 2012; Stefaniak et al., 2012). Business
continuity is still an emerging concept (Pelfrey & Kelley, 2013). There was no sufficient
past literature on the perceived roles of the internal auditor in business continuity
planning within the government sector.
Prior studies recognized the expertise of the internal audit identifying and
prioritizing risk, but there was no sufficient work on the perceived roles of the internal
auditor in business continuity planning within the government sector (Schneider et al.,
2012; Stefaniak et al., 2012).
Summary
The purpose of this qualitative single-case study was to understand the use and
the perceived roles of the internal auditor in business continuity planning within the
government sector. The results of the study arose from data analysis of 20 interview
questionnaires derived from a theoretical sample. The steps included a pattern of
response matching, coding, and labeling of themes arising from the analysis. The data
analysis resulted in five themes. The five themes for the overarching research question
110
included: (a) significant negative impact, (b) obstacles, (c) major roles, (d) areas to be
excluded from the internal auditor, and (e) internal auditor’s independence.
The findings arising from the study indicated that potential risks could be great
when a government sector falls short of implementing the required and appropriate
measures to mitigate disruptions, that might result in improper response to an emergency
and possible use of limited resources undesirably. Organizations are concerned about
people, property damage, and monetary loss, but not enough attention is given to
confidential and sensitive information that can potentially lead to negative exposure.
Findings from past literature indicated some similarities with the current study in
terms of the need for government sector implementing certain measures to ensure
mitigation of disasters and other disruptions. Some organizations fail properly to conduct
a complete analysis of potential disruptions or risks, and as a result, they are unable to
assess current risk mitigation strategies. Findings from the current study also indicated
that the government sector does not consider risks that could impede the government
sector’s ability to mitigate successfully the impact of disruptions owing to other
competing priorities and the lack of adequate resources needed to plan business
continuity properly. Additionally, business continuity plans are seldom tested. There is
also the perception that disruption will never happen, a lack of commitment or proper
communication, and unqualified personnel being assigned to deal with disruptions
Additionally, the information used in business impact analysis lacked currency
and was not aligned with the agency’s mission and objectives. The findings also
indicated that some management of organizations, including the government sector
would not want the internal auditor to be involved with business continuity planning
111
because of threats to the internal auditor’s independence. Findings from the current study
also indicated that management would be leery about getting the internal auditors’
perspective in the development and implementation of business continuity planning
because they would not provide value because of the knowledge gaps and that the
internal auditors would get in their way of their planning. Additionally, the internal
auditor might not have a strong working relationship with individuals in different
business units just because they are auditors and are always scavenging for mistakes that
could result in future audits. As a result, management might not be receptive to the
internal auditor’s participation since that might create more issues. Another issue was the
perception that management’s lack of awareness of the internal auditor’s role in the
organization could result in not involving them in business continuity planning.
The findings indicated that the internal auditors should play a major role in
business continuity planning in the government sector because they have a broader view
of the organization and might provide valuable insight on areas that are at risk. Although
there could be a threat to the internal auditor’s independence for participating in the
business continuity planning; as a safeguard and to dilute such perception, there should
be an understanding up front with management of the government sector clarifying that
the roles of the internal auditor would be as a consultant and not as someone making
decisions for management. The internal auditor’s participation would ensure
management and those charged with governance are getting objective information related
to business continuity planning. Such participation could be viewed positively or
negative by those charged with governance, depending on their understanding of the roles
of the internal auditor.
112
The specific areas internal auditors could be involved in business continuity
planning included identifying risks and strategies for mitigating those risks, prioritization
of critical services, the identification of resources necessary to deploy those services,
evaluating different recovery strategies, implementing, testing and maintaining the plan.
In these cases, the internal auditor should be used as an advisor on account of their
overall understanding of the risks facing the organization. Past studies supported the
findings of the current study that internal auditors better understand and have a broader
view of the risks affecting the organization and the potential impact. But there was no
sufficient past literature on the perceived roles of the internal auditor in business
continuity planning within the government sector.
113
Chapter 5: Implications, Recommendations, and Conclusions
The purpose of this qualitative single-case case study was to understand the use
and the perceived roles of the internal auditor in business continuity planning within the
government sector (Hall et al., 2012). But without the involvement of those with the
expertise related to risk assessment and evaluation, management of a government agency
could assume undesirable business continuity risks. An internal auditor is an independent
person who has a broader view of the organization and understands risk evaluation. This
position reports directly to those charged with governance and also ensures a decision has
been adequately documented (García et al., 2012). The internal auditor’s qualifications
are essential in determining the ability to perform his or her duties adequately, which
includes at least a four-year degree, certifications as Certified Internal Auditor, Certified
Public Accountant, or Certified Information Systems Auditor. Internal auditors are
required to participate in continuing professional education (Abbass & Aleqab, 2013;
Kamel & Elkhatib, 2013). There is no sufficient literature on the perceived roles of the
internal auditor in business continuity planning in the government sector.
Governments oftentimes are ill-prepared to handle disasters because of a lack of
adequate resources, other competing issues, and improper preparation for catastrophic
events (Donahue, Cunnion, Balaban, & Sochats, 2012; Jensen, 2011; Renaud, 2012).
Therefore, they apply their resources on more critical issues. Even the Nationwide Plan
Review conducted by the Department of Homeland Security determined that only 10% of
business continuity plans are adequate to mitigate the effect of disasters (DHS, 2006).
The shortcomings identified included a lack of proper documentation of risks and the
probability of occurrence and consideration of critical segments of the public (DHS,
114
2006). The lack of adequate preparation could pose a significant challenge to the
government should an event occur (Ericksson, 2009). Furthermore, these shortcomings
could overtax the needed resources that are earmarked for mitigating the effect of
catastrophic events and possibly the loss of revenue. Additionally, catastrophic events
could result in unnecessary distress, harm, and the public perception of the government
could plummet abysmally (Kusumasari et al., 2010; Shughart, 2011). These
shortcomings are usually because of the lack of planning properly. Proper planning
includes proper identification of risks, the probability of occurrence, impact analysis,
consideration of response alternatives, and testing and maintenance (Kruger, 2009;
Kusumasari et al., 2010). Consequently, the problem addressed by this study was the
lack of the use and the limited understanding of the perceived roles of the internal auditor
in business continuity planning in the government sector.
Governments are usually concerned about continuity since they are under pressure
to keep up with the citizen’s expectations for optimal services. Additionally,
globalization and technological advancements have changed how governments do
business (Nasim & Sushil, 2010). For example, Malaysia had never experienced a
tsunami until its occurrence in 2006 and because of the lack of proper planning,
experience, and expertise, the government was not prepared to mitigate the disruption
arising from that event (Raman et al., 2011). Potential risks to the government might
include the loss of mission critical data, displacement of workers, and unavailability of
facilities due to catastrophic events (Gourio, 2012).
The purpose of this qualitative single-case study was to understand the use and
the perceived roles of the internal auditor in business continuity planning within the
115
government sector. The study identified the obstacles that could negatively affect the
resumption of service when there is a disruption. The focus of this case study was
examining the roles of internal auditors in the governmental sector, specifically, for the
State of Texas in the United States. The study was a single case qualitative research with
an embedded unit of analysis that comprised 20 internal auditors in the government
sector, specifically, the State of Texas. The study utilized an interpretive approach and
theoretical sampling (Patton, 2002; Suri, 2011; Yin, 2009). Data sources utilized for this
case study were document reviews and interviews. Five themes surfaced from data
analysis: (a) significant negative impact, (b) obstacles, (c) major roles, (d) area to be
excluded from the internal auditor, and (e) internal auditor’s independence.
But the inquiry was limited to those internal auditors working in the State of
Texas. Therefore, the study was inhibited by the experiences, knowledge, and perceptions
of the participants. As a result, the findings of the study might not meet the perceived
expectations of past researchers of reliability, credibility, transferability, and validity in
the research design, data collection, and data analysis process (Patton, 2002).
Additionally, the findings might not apply to all internal auditors in all government
sectors.
A limitation of this study was that the inquiry was made only to internal auditors
working in the State of Texas. Therefore, the study was inhibited by the experience,
knowledge, and perceptions of the study participants. As a result, the findings of the
study might not meet the perceived expectations of past researchers of reliability,
credibility, transferability, and validity in the research design, data collection, and data
analysis. Additionally, the findings might not apply to all internal auditors in all
116
government agencies. but that was not the objective of this study. Rather, the goal was
fully to understand the roles of the internal auditor in the government sector, specifically
the State of Texas. Nevertheless, the research design could apply to other government
agencies in the United States with the reasonable expectation of achieving similar results.
For example, involving the internal auditor in business continuity planning could be
viewed as a needless step in business risks evaluation by management. On the other
hand, soliciting the expertise of the internal auditor could be viewed as a necessary
process to mitigate adequately the risks considered by management. However, the
generalization of research findings would be at the discretion of future researchers (Jones,
2010).
There were measures in place during the research to ensure ethical assurances
throughout the research. The researcher began collecting data after obtaining the
approval of the IRB for the current study. Each participant signed an Informed Consent
form indicating agreement to participate in the study. A questionnaire was utilized for
the interview. All participants were briefed about the purpose of the study and data
collection (APA, 2010, Hicks, 2011). Additionally, all participants were informed of
their rights not to participate or to terminate at any time without any negative
ramifications (Paul, 2012).
The participants’ privacy and confidentiality were deemed very important; as a
result, fictitious names of people and government agencies were used. No identifiable
information was utilized throughout the study (Hicks, 2011). The researcher was the
only one that had access to the list linking participants and their specific government
agencies. Data obtained during this study were kept in a password-protected computer
117
and in a locked cabinet, and only the researcher has access to it. All data will be deleted
and destroyed seven years after the completion of the study. Additionally, the researcher
has made sure the dissertation manuscript includes no identifying information; (Matuk &
Young, 2011). Therefore, there is minimal risk of harm resulting from this research
(Arwood & Panicker, 2011).
The documentation and reporting of research results included the necessary
information. Additionally, data were not exploited, and there was no evidence of bias in
analysis and reporting of findings (APA, 2010). The researcher was able to achieve this
by carefully reviewing the information obtained during the research study which included
tracing back to the appropriate source documents and cross-referencing to report. This
procedure provided reasonable assurance that errors would be prevented or detected and
that findings were presented accurately (APA, 2010; Hicks, 2011).
This chapter includes a discussion of implications, recommendations, and
conclusion of the research study. Implications include discussions on the results of the
study in relation to the purpose and problem that warranted the study. Additionally,
recommendations are structured around theoretical contribution and practical application,
best practices, and proposals for future research. Finally, the conclusions arising from
this study are presented.
Implications
The implications arising from the results of this study were addressed below. The
overarching research question is stated again, followed by (a) any potential limitations
that affected the interpretation of the results; (b) the significance of the findings and the
118
response to the study problem and purpose using the five themes identified in the
analysis; and (c) how the study contributes to the existing literature.
Research question. What are the perceived types and possible impacts of service
disruptions within the government sector, obstacles that could negatively affect the
resumption of service when a disaster occurs and the roles of the internal auditor in
business continuity planning? The themes that arose from this study addressed the
overarching research question. The results from this study depicted several key points
related to the research question.
Potential limitations. As stated in Chapter 3, a limitation of this that the inquiry
was made only to internal auditors working in the State of Texas. Therefore, the study
was inhibited by the experience, knowledge, and perceptions of the study participants. As
a result, the findings of the study might not meet the perceived expectations of past
researchers of reliability, credibility, transferability, and validity in the research design,
data collection, and data analysis. Additionally, the findings might not apply to all
internal auditors in all government agencies. But the primary objective of the study was
to understand the roles of the internal auditor in the government, specifically, for the
State of Texas. Though the results of the study could be applied to other government
agencies in the United States or other parts of parts of the world with the reasonable
expectation of achieving similar results; this was not the objective of the study.
The significance of the findings and the response to the study problem and
purpose using the five themes identified in the analysis. Theme 1: Significant negative
impact. The first theme addressed the significant negative consequences of disruptions
for the government sector because of a lack of business continuity planning. An
119
implication of theme 1 was the acknowledgment of the possible existence of third-party
agreements, manual workarounds, systemic redundancies, back-ups, and transfer of risk
with insurance companies (Afedzie & McEntire, 2010). However, government agencies
have the mandate to continue to provide services to the public, whether or not there is a
disruption (Goudsmit, 2012; Klein, 2012). The government sector cares about the
implications of disruptions, especially the possible impact on people, property, and the
overall monetary loss. The emergence of theme 1 indicated that the government sector
might find it difficult to continue to provide services to the public should a disruption
occurs, if there was no adequately developed and implemented business continuity plan
(DHS, 2013). Additionally, government agencies deal with confidential and sensitive
information that could be compromised if business continuity risks were not evaluated
properly and assessed. Therefore, without the proper expertise in business continuity
planning management might not adequately evaluate and assess the overall risks affecting
a government agency; leaving the organization vulnerable if an event occurs (Rosenberg,
2014; Verchick & Hall, 2011).
Theme 2: Obstacles. Elements or lack of elements that get in the way of dealing
with disruptions successfully. The theme 2 implies that there is a lack of commitment,
views that unforeseen issues will never happen, lack of better communication, and
unqualified persons being entrusted with dealing with disruptions (Jahangiri et al., 2011).
Theme 2 further indicated that key stakeholders and process owners did not consider
business continuity of high importance in relation to the overall mission of the
organization. Additionally, managements of the government sector are leery about the
input of the internal auditor during business continuity planning owing to the threat to
120
independence, knowledge gaps, or a lack of value being provided by the internal auditor.
Theme 2 also implied that involving the internal auditor might negatively affect
productivity because of the perception auditors are always looking for mistakes that could
warrant a future audit by the internal auditor. Finally, theme 2 also indicated that
management’s lack of the awareness of the internal auditor’s roles in the government
could necessitate excluding them in business continuity planning. The implication of
theme 2 was that some government agencies seemed to fail to properly perform a full
examination of possible issues or threats to business continuity. Therefore, they were
unable to assess viable mitigation strategies. Additionally, business continuity was rarely
tested in the government sector, and there was a lack of action plans and a lack of
resources to properly plan business continuity or action plans (Heller, 2012). Another
implication of theme 2 was the failure to develop and implement a business continuity
plan (Jarvelainen, 2012). Additionally, the information used in business continuity
planning lacked currency.
Theme 3: Major roles. Major roles are the reasons for or not involving the
internal auditor in the business continuity planning. In theme 3, the importance of the
internal auditor in business continuity planning was identified. The internal auditor has a
broader and independent understanding of the organization and could provide invaluable
insight into areas that are at risk (Kusumasari et al., 2010; Haque et al., 2012). The
internal auditor understands risks that might be neglected by management and are in a
position to serve in an advisory capacity in the development and implementation of
business continuity planning. The implications of this study included providing valuable
insights to management, policymakers, and the internal auditor about the perceived roles
121
of the internal auditor in business continuity planning in the government sector and how
to utilize his or her expertise while ensuring independence and objectivity owing to their
experience in risk identification and assessment of risks. The participation of the internal
auditor would provide reasonable assurance that the business continuity planning process
was adequate. Owing to their enterprise-wide risk perspective, internal auditors are
positioned to inform those charged with governance regarding the government entity’s
critical systems and the protection in place (Dickins & Daughterty, 2012; Kotb, Sangster,
& Henderson, 2014).
Theme 4: Areas to be excluded from the internal auditor. If internal auditors
should be involved in business continuity planning, the areas they should be excluded.
Theme 2 implied that internal auditors should be involved in business continuity
planning, but they should only participate in an advisory capacity. The implication was
that when involvement was in an advisory capacity, the internal auditor would be
objective. Additionally, they would be in a position to validate the information provided
by various departments of the government sector (Jones, 2015). They accomplish this by
identifying key business risks and control gaps, conducting audits when deemed
necessary, and serving in an advisory capacity in identifying priorities that affect the
government sector (Dickins & Daughterty, 2012; Yoon, Young, & Abe, 2012).
The areas that should be excluded from the internal auditors’ participation would
include the update and maintenance of the business continuity plan since those are
considered management functions (Rosenberg, 2014). Additionally, internal auditors
should be excluded from disaster recovery and recovery strategy since they are
considered management functions. The implication was that the internal auditor would
122
be in a position to provide decisive consulting roles in areas that promote efficiency and
effectiveness of the business continuity process and help diffuse intra-agency competing
interests.
Theme 5: Internal auditor’s independence. The reaction of those charged with
governance and the necessary safeguards to mitigate the potential impairment of the
independence of the internal auditor regarding participation in business continuity
planning. Theme 5 implied that the independence of the internal auditor would not be
impaired for participating in business continuity planning, but there could be a threat to
independence depending on roles of the internal auditor in the process. The implication
of theme 5 was that the independence of the internal auditor would not be impaired if the
necessary safeguards were put in place by the government sector. These safeguards
would include an understanding up front with the management of the government sector
outlining the roles of the internal auditor as a consultant, not as someone making
management decisions for the organization (Jalba, 2013; Kanellou & Spathis, 2011)
Theme 5 also implied that reactions of those charged with governance could be
negative or positive, depending on their understanding of the roles of the internal auditor
in business continuity planning within the government sector. As a result, it would be the
duty of the internal auditor to explain to management and those charged with governance
why the internal auditor should play an active role in business continuity planning within
the government sector (Zaman & Sarens, 2013). An implication of theme 5 is that the
acceptance of the internal auditor’s roles in business continuity planning in the
government sector might depend on the internal auditor’s ability to convince those
123
charged with governance that there would be a greater level of assurance in the process
owing to the internal auditor’s independent assessment and reporting of the process.
Connection to current literature. The study expanded the current knowledge of
business continuity planning and explored the roles of the internal auditor in business
continuity planning in the government sector. Current literature indicated some
similarities with the current study in terms of the need for the government sector to
implement certain measures to ensure mitigation of disasters and other disruptions.
Current literature supported the importance of business continuity planning to
ensure that the government sector is ready to respond to a service disruption or
emergency. Additionally, the negative effects of a service disruption or disaster can be
significant to the government sector, which might include casualties or even death,
negative public perception, property damage, and monetary loss (Day et al., 2012;
Haddow et al., 2011). Therefore, when proper skills and knowledge are not used to
ensure continuity of business, there is the risk of unsuccessful response to a disaster, and
potentially significant losses (Haque et al., 2012; Kusumasari et al., 2010).
Findings from the current study also indicated that the government sector does not
consider risks that could impede the government sector’s ability to mitigate the impact of
disruptions successfully. This assertion contrasts with past research which showed that
the government considers different types of risks. Additionally, sometimes staff are not
adequately trained on what to do in the event of an emergency (Chen & Lee, 2012).
Current literature focused on the risks facing organizations today. For example,
there were risks related to natural disasters such as wind, hail tornadoes, and lightning
(Goudsmit, 2012). There were past findings on the need for public asset managers to
124
mitigate and prepare for future, business continuity planning management in local
governments, an exploration on business continuity planning in Michigan small
businesses, how to ensure continuity of business in general small and medium businesses,
and on education technology (Botha & von Solms, 2004; Lasecki, 2009; Mekdeci, 2011;
Smit, 2005; Warren, 2010).
Current literature supported the findings in the current study which included
developing and implementing a business continuity plan to mitigate potential loss
through the identification, prioritization, and safeguarding of critical assets of the
business, not only information technology (Hoong & Marthandan, 2014). Additionally,
there were studies supporting the findings in the current study that internal auditors
understand and have a broader view of potential risks affecting the organization and the
potential impact of any loss (Schneider et al., 2012; Stefaniak et al., 2012). Business
continuity is still an emerging concept (Pelfrey & Kelley, 2013). There was no sufficient
past literature on the perceived roles of the internal auditor in business continuity
planning within the government sector.
Current literature recognized the expertise of the internal audit identifying and
prioritizing risk, but there was no sufficient work on the perceived roles of the internal
auditor in business continuity planning within the government sector (Schneider et al.,
2012; Stefaniak et al., 2012).
Recommendations
Practical applications. The five themes supported the recommendations for
practice and future research. The findings are relevant to internal auditors, management,
and policy makers in the government sector. They can use the information from this
125
research to gain an adequate understanding of the perceived roles of the internal auditor
in the government sector and how to safeguard against the impairment of independence
and objectivity. The research findings can assist in possibly mitigating the significant
negative impact of disruptions, addressing the obstacles that get in the way of
implementing sound business continuity planning, understanding the major roles internal
auditors can play in business continuity planning and areas that should be excluded, and
the importance of safeguarding the independence of the internal auditor. Additionally,
this research provides insight for those charged with governance to ensure the
endorsement of the participation of the internal auditor in the business continuity
planning in the government sector. Data collected from internal auditors provided
insights about how to involve the internal auditor in business continuity planning without
compromising objectivity and independence.
There were several recommendations that emerged from this study regarding
business continuity planning in the government sector and how the involvement of the
internal auditor could aid in mitigating disruptions. The following recommendations
arose from the five themes that emerged from this study: (a) understanding the negative
impact of disruptions, (2) exploring the obstacles that could prevent implementing
business continuity planning and develop mitigation strategies, (c) soliciting the expertise
of the internal auditor to ensure all agency-wide risks are considered, (d) excluding the
internal auditor from participating in areas that pose significant conflicts, and (e)
clarifying the roles of the internal auditor in the organization and getting the support of
management and those charged with governance to embrace those roles. These
recommendations align with the overarching research question.
126
It is important to understand the negative impact of disruptions in the government
sector. It is somewhat comforting to acknowledge the existence of third-party
arrangements, manual workarounds, systemic redundancies, back-ups, and transfer of
risk with insurance policies (Afedzie & McEntire, 2010). However, government agencies
are expected to continue providing services to the public, whether or not there is a
disruption. When business continuity planning is not properly developed and
implemented by the government sector, sensitive and confidential data could be
compromised or lost. Additionally, a disruption could negatively impact the automated
environment, health, and safety of the public. As a result, there might not be viable
options to mitigate a disruption if no business continuity planning existed. Also, the
government is always concerned about the possible impact on its resources, which
includes people, equipment, operating systems, and facilities (Goudsmit, 2012; Klein,
2012).
When business continuity planning is being implemented without the involvement
of the internal auditor, chances are significant risks may not be considered. Additionally,
when pertinent risks are not considered during the business continuity process, the effect
could be catastrophic (DHS, 2013). As a result, management should make concerted
efforts to ensure proper mitigation of any potential disruption. One of the crucial ways of
accomplishing this is through the implementation of business continuity planning. A
good business continuity planning requires the involvement of the right personnel which
includes those knowledgeable in organization-wide risk assessment and analysis and the
buy-in of those charged with governance.
127
Again, mitigation of disruptions is very crucial to the government sector because
they continue to protect the interest of the public. Regrettably, some government
agencies fail properly to perform a full analysis of potential disruptions or risks, thereby
defaulting to being unable to assess immediate mitigation strategies. A part of the
reasons includes the use of outdated information and data that are not aligned with the
objectives and mission of the government agency. Additionally, oftentimes, there is the
belief that disruptions will never happen, and some do not see the need for business
continuity planning owing to the third-party transfer of risk. Additionally, the right
individuals are not assigned to develop and implement a business continuity plan. As a
result, all pertinent risks are not usually considered. Some government agencies perceive
internal auditors as a hindrance to planning because of their roles in the organization.
The right individuals should be involved in business continuity planning. The
personnel should be trained on how to identify and respond to a disruption. Also, the
business continuity plan must be tested and updated periodically. Additionally, there
should be training focusing on risks affecting the government sector, the probability of
occurrence, the potential impact of those risks, strategies for mitigating them, and
selecting the right strategy.
The third recommendation pertains to the roles of the internal auditor in business
continuity planning. Oftentimes, management of the government sector might neglect
certain risks that could have potential negative impact on the organization. The impact
might include delay or shut down of services which ultimately could affect the health and
safety, facilities, and even employees. Fortunately, the government internal auditor has
an in-depth understanding of the risks facing the organization as a whole. This
128
understanding is on account of their roles in the organization as experts in risk
assessment.
Most of the areas within the government sector probably had been audited in the
past by the internal auditors. As a result, they are in a position to provide an objective
insight into areas within the organization that are susceptible to risk. They can review
risk assessment and analysis conducted by management and other personnel of the
government sector for the adequacy and appropriateness. They can assist with business
impact analysis and possibly audit the business continuity plan to ensure relevancy to the
government sector.
The review of the business continuity plan allows the internal auditor to identify
weaknesses that could be rectified prior to a disruption materializing. The internal
auditor also could be the eyes and ears of those charged with governance in terms of the
comprehensiveness of the business continuity plan. Finally, there should be training on
the roles of the internal auditor. The internal audit charter should be reviewed and
updated periodically to ensure the roles of the internal auditors are fully defined and that
their expertise is maximized by the government sector.
The fourth and fifth recommendations pertain to the exclusion of the internal
auditor from participating in areas that pose significant conflicts, clarifying the roles of
the internal auditor in the organization, and obtaining the support of management and
those charged with governance to embrace those roles. Although internal auditors are
considered experts in risk assessment and mitigation due to their overall knowledge of
the organization, their participation in business continuity planning in the government
sector should be in an advisory capacity. In essence, they should not be participating in
129
management functions. Non-participation in management functions would ensure
objectivity in the internal auditor’s roles. For example, the internal auditor should not be
participating in the update and maintenance of the business continuity plan because those
are considered management functions.
Additionally, disaster recovery should be performed by management and staff
rather than the internal auditor because they are considered management functions.
Nevertheless, the internal auditor should be involved in analysis and testing of the
business continuity plan so as to provide objective insight to management and those
charged with governance about the results. Although internal auditors might not be
directly involved in the business impact analysis since it is a management, they should
provide essential insight to management and staff to ensure the necessary risks are
considered. Consideration of necessary risks is also essential in diffusing intra-agency
competing interests during the initiation of business continuity planning. Although the
internal auditor’s participation in business continuity planning is essential in business
continuity planning, there could be a threat to the independence of the internal auditor if
their role is not properly defined. To mitigate any threat, there should be safeguards in
place. First, there should be an understanding with management and those charged with
governance in the government sector delineating the roles of the internal auditors in the
organization and their levels of participation in business continuity planning. They
should not be making decisions for management but should be considered as consultants.
An example of such agreement should be in the form of a Memorandum of
Understanding or a Statement of Work. This agreement will clarify the roles of the
internal auditor with respect to business continuity planning. Therefore, the internal
130
auditor should not be the owner of the business continuity plan; and as a result, he or she
cannot participate in determining priorities within the organization.
The reactions of those charged with governance could be positive or negative in
terms of the internal auditor’s participation in business continuity planning. However, it
is the duty of the internal auditor to clarify to management and those charged with
governance the reasons for the internal auditor’s participation (Muqattash, 2011; Aikins,
2012). An alternative method of clarifying might include referring them to the Internal
Auditor Charter. The charter spells out the responsibilities of the internal auditor in the
organization. With a full understanding of the roles of the internal auditor, those charged
would embrace the independence and objectivity of the internal auditor and should
welcome such role (Dickins & Daughterty, 2012; Elmore, 2013; Kotb, Sangster, &
Henderson, 2014; de Zwaan et al., 2011; ).
. Future research. Three recommendations are being considered for future
research. The first is to determine whether the internal auditor should play a role in
maintenance and update of the business continuity plan. The public expects the
government to ensure continuity of operations. The lack of an updated business
continuity plan could pose a significant risk to the organization when the documents
become outdated and can not be invoked during a disruption (Campbell, 2013; McGuire
& Schneck, 2010). These risks could be mitigated by employing properly designed
business continuity planning that considered the business impact analysis, security risks,
recovery alternatives, implementation, and maintenance, utilizing the right personnel.
These individuals would determine how and when to update the business continuity plan.
The updated business continuity plan should continue to align with the objectives of the
131
organization to ensure swift mitigation of any disaster or disruption. Future research
needs to explore whether it is necessary for internal auditor to play any role in the update
and maintenance of the business continuity plan, especially as someone who broadly
understands the risks that are pertinent to the organization (Amaratunga, 2014; A. C. K.
Lee, Booth, Challen, Gardois, & Goodacre, 2014; McGrady & Blanke, 2014).
The second recommendation is to determine why organizations would be
reluctant to test their business continuity plans periodically. Governments must be
genuine and reliable in providing services for the public, especially when mitigating
disruptions (Koronis & Ponis, 2012). The Internet has provided efficiency and
effectiveness in all aspects of the world. Additionally, the number of connections and
data exchange has increased (Ghezzi et al., 2013). Additionally, technology has made the
world one interconnected marketplace. Therefore, there are questions on how to manage
and govern it (De Turck et al., 2012).
Organizations are steadily transitioning from stand-alone word processing and
paper filing to server-based systems (Friedman, 2014). These systems make it easier to
access documents remotely and obtain real-time information. As more and more
catastrophic events occur, organizations and the public as a whole are concerned about
business continuity. When a crisis is not properly mitigated, there could be a temporary
disconnection with the public or other users of services or even permanent disruption of
business relations (Koronis & Ponis, 2012). The public expectations have caused some
regulatory agency personnel to begin thinking seriously about business continuity
planning (Jones, 2011). Consequently, it is necessary to develop and implement business
continuity planning to ensure mitigation of disruptions. The business continuity plan
132
should be tested periodically to ensure management can truly mitigate disruptions
whenever they occur. Oftentimes, organizations are reluctant to test their business
continuity plans (Abramson et al., 2015; Amaratunga, 2014; McGrady & Blanke, 2014).
Future research needs to determine why some organizations are reluctant to the test their
business continuity plans.
The third recommendation is to determine the roles of the internal auditor in
business impact analysis during the development of a business continuity plan. Business
impact analysis is considered one of the foremost steps organizations follow during the
development of the business continuity plan (Kent, 2011). A governmental agency that is
developing a business continuity plan identifies events that could negatively impact
operations, especially financial information (Bajgoric, 2014; Nicoll & Owens, 2013).
Therefore, to complete this aspect of the business continuity plan process, there should be
an adequate understanding of the government sector’s operations, its key processes, and
technology platform used by the government agency. Additionally, there should be
consideration of cost, downtime, and recovery of data (Davison, 2014). The overall goal
should be to mitigate disruptions at minimal costs (Davison, 2014). Since the internal
auditor understands the operations of the entity, future research should consider exploring
whether the internal auditor should play a role in business impact analysis.
Conclusions
This qualitative case study explored the perceived roles of the internal auditor in
business continuity planning in the government sector. This chapter contains a
discussion of the findings emerging from the research and the implications of the roles of
the internal auditor in business continuity planning. Additionally, there are
133
recommendations for practical applications and suggestions for future research. The
conclusions arising from this research are presented.
The risks could be severe when a government entity fails to implement measures
to ensure continuity of operations. Such risks would include the inability to respond to an
emergency and the inefficient use of limited resources. The government sector is worried
about people, property damage, and monetary loss, but findings of the research indicated
that government entities are not giving enough attention to confidential and sensitive
information. Sometimes the government sector would not consider risks that could
impede their ability to mitigate disruptions. As a result, they could potentially expose
their organizations to significant losses.
Findings from the current study also indicated that the government sector did not
consider risks that could hinder the entity from successful mitigation of disruptions
because preference was given to other pressing issues affecting the government sector.
Additionally, management of the government sector cites the lack of adequate resources
as the reason for not paying greater attention to business continuity planning.
Surprisingly, while some governmental entities that had business continuity plans rarely
tested them, there were those who believed a disruption would never occur. There was a
lack of commitment or communication, training about mitigating disruptions, and inept
personnel being assigned to deal with disruptions, and business impact analysis data were
accurate and not aligned to the government sector’s mission and objectives.
The findings also indicated that some members of organizations would prefer
non-participation of the internal auditor in business continuity planning. This preference
was because of the perceived threat to the internal auditor’s independence. Some
134
reasoned that the internal auditor’s participation would be useless because they would not
provide value because of a lack of knowledge. As a result, the internal auditor would be
a hindrance in business continuity planning. Additionally, the internal auditor might not
have a good rapport with some members of the organization just because they are
auditors who might be looking for deficiencies that necessitate conducting future audits
of different departments. Another issue was that, sometimes, management might not be
cognizant of the roles of the internal auditor in the organization, and as a result, they
would be reluctant to get them involved in business continuity planning.
Internal auditors should be involved in the business continuity planning in the
government sector because of their knowledge of the entity and insight about risks
affecting the organization. There might be a threat to the internal auditor’s independence
owing to participation in business continuity planning and a subsequent audit of the
process by the internal auditor. To mitigate such a threat, the organization and internal
auditor should implement safeguards. Such safeguards might include having a written
understanding with management at the outset of the engagement delineating the roles the
internal auditor as an advisor and not as an individual who would be participating in
management decisions. Additionally, the documented understanding would assure
management and those charged with governance of the internal auditor’s objectivity in
the business continuity planning process.
Internal auditors’ perceived roles in business continuity planning in the
government sector would include the identification of risks and the approach for
combating those risks, objective prioritization of critical processes, familiarization, and
categorization of the limited resources needed for those services, and evaluation of
135
recovery strategies to ensure properly developed and implemented business continuity
planning. The overall objective would be to mitigate disruptions and continue to meet
the public mandate for the government.
136
References
Abbass, D. A., & Aleqab, M. M. (2013). Internal auditors' characteristics and audit fees:
Evidence from Egyptian firms. International Business Research, 6(4), 67-80.
http://dx.doi.org/10.5539/ibr.v6n4p67
Abbott, L. J., Daugherty, B., Parker, S., & Peters, G. F. (2016). Internal audit quality and
financial reporting quality: The joint importance of independence and
competence. Journal of Accounting Research, 54, 3-40. http://dx.doi.org/10.1111
/1475-679X.12099
Abramson, D. M., Grattan, L. M., Mayer, B., Colten, C. E., Arosemena, F. A., Bedimo-
rung, A., & Lichtveld, M. (2015). The resilience activation framework: A
conceptual model of how access to social resources promotes adaptation and rapid
recovery in post-disaster settings. The Journal of Behavioral Health Services &
Research, 42, 42-57. http://dx.doi.org/10.1007/s11414-014-9410-2
Adams, L. M. (2008). Comprehensive vulnerability management: The road to effective
disaster planning with the community. Journal of Theory Construction & Testing,
12(1), 25-27. Retrieved from http://tuckerpub.com/jtct.htm
Adini, B., Laor, D., Cohen, R., & Israeli, A. (2012). Decision to evacuate a hospital
during an emergency: The safe way or the leader's way? Journal of Public Health
Policy, 33, 257-268. http://dx.doi.org/10.1057/jphp.2012.2
Afedzie, R., & McEntire, D. A. (2010). Rethinking disasters by design. Disaster
Prevention and Management, 19, 290-295. http://dx.doi.org/10.1108/
09653561011022135
Aikins, S. K. (2011). An examination of government internal audits’ role in improving
financial performance. Public Finance and Management, 11, 306-337. Retrieved
from https://www.scribd.com/document/188244398/AUDITS-ROLE-IN-
IMPROVING-FINANCIAL-performance
Aikins, S. K. (2012). Determinants of auditee adoption of audit recommendations: Local
government auditors’ perspectives. Journal of Public Budgeting, Accounting &
Financial Management, 24, 195-220. Retrieved from http://pracademics.com
/attachments/article/847/Article%201_Aikins.pdf
Akkiraju, R., Bhattacharjya, D., & Gupta, S. (2012). Towards effective business process
availability management. Journal of Service Science Research, 4, 319-351.
http://dx.doi.org/10.1007/s12927-012-0013-2
Alam, I. (2005). Fieldwork and data collection in qualitative marketing research.
Qualitative Market Research, 8(1), 97-112. http://dx.doi.org/10.1108
/13522750510575462
137
Aleem, A., & Christopher, R. S. (2013). Let me in the cloud: Analysis of the benefit and
risk assessment of cloud platform. Journal of Financial Crime, 20(1), 6-24.
http://dx.doi.org/10.1108/13590791311287337
Allen, L. E. (2008). Where good ERP implementations go bad: A case for continuity.
Business Process Management Journal, 14, 327-337. http://dx.doi.org/10.1108
/14637150810876661
Al-Matari, E. M., Al-Swidi, A. K., & Fadzil, F. H. B. (2014). The effect of the internal
audit and firm performance: A proposed research framework. International
Review of Management and Marketing, 4(1), 34-41. Retrieved from
http://www.econjournals.com/index.php/irmm/article/viewFile/669/pdf
Amancei, C. (2011). Practical methods for information security risk management.
Informatica Economica, 15(1). 151-159. Retrieved from
http://www.revistaie.ase.ro/content/57/13%20-%20Amancei.pdf
Amaratunga, C. A. (2014). Building community disaster resilience through a virtual
community of practice (VCOP). International Journal of Disaster Resilience in
the Built Environment, 5, 66-78. http://dx.doi.org/10.1108/ijdrbe-05-2012-0012
American Psychological Association (APA). (2010). Ethical principles of psychologists
and code of conduct: 2010 amendments. Retrieved from http://www.apa.org
/ethics/code/
Anderson, U. L, Christ, M. H., Johnstone, K. M., & Rittenberg, L. A. (2012). A post-
SOX examination of factors associated with the size of internal audit functions.
Accounting Horizons, 26(12), 167-191. http://dx.doi.org/10.2308/acch-50115
Arwood, T., & Panicker, S. (2011). Assessing risk in social and behavioral sciences.
Retrieved from https://www.citiprogram.org/
Asgary, A., & Mousavi-Jahromi, Y. (2011). Power outage, business continuity and
businesses' choices of power outage mitigation measures. American Journal of
Economics and Business Administration, 3, 312-320. http://dx.doi.org/10.3844
/ajebasp.2011.307.315
Ayalon, Y. (2011). Ottoman urban privacy in light of disaster recovery. International
Journal of Middle East Studies, 43, 513-528. http://dx.doi.org/10.1017
/S002074381100064X
Badara, M. S., & Saidin, S. Z. (2013). The journal so far on internal audit effectiveness:
A calling for expansion. International Journal of Academic Research in
Accounting, Financial, and Management Sciences, 3, 340-351.
http://dx.doi.org/10.6007 /ajarafms/v3-i3/223
138
Baird, J. E., Zelin, R. C., II, & Booker, Q. E. (2012). Is there a "digital divide" in the
provision of e-government services at the county level in the United States?
Journal of Legal, Ethical and Regulatory Issues, 15(1), 93-104. Retrieved from
http://www.alliedacademies.org/legal-ethical-and-regulatory-issues/
Bajgoric, N. (2014). Business continuity management: A systemic framework for
implementation. Kybernetes, 43, 156-177. http://dx.doi.org/10.1108/K-11-2013-
0252
Baker, N. (2012). Enterprise business continuity. Internal Auditor: Journal of the
Institute of Internal Auditors, 69(3), 36-40. Retrieved from https://na.theiia.org
/periodicals/Pages/Internal-Auditor-Magazine.aspx
Barnett-Page, E., & Thomas, J. (2009). Methods for the synthesis of qualitative research:
a critical review. BMC Medical Research Methodology, 9, Art. 59. http://dx.doi
.org/10.1186/1471-2288-9-59
Bayrak, T. (2009). Identifying requirements for a disaster. The Daily Post, 18(2), 23-26.
http://dx.doi.org/10.1108/09653560910953171
Beets, S. D. (2011). Critical events in the ethics of U.S. corporation history. Journal of
Business Ethics, 102, 193-219. http://dx.doi.org/10.1007/s10551-011-0805-1
Beggan, D. M. (2011). Disaster recovery consideration for academic institutions.
Disaster Prevention and Management, 20, 413-422. http://dx.doi.org/10.1108
/09653561111161734
Ben-Shahar, O., & Logue, K. D. (2013). Outsourcing regulation: How insurance reduces
moral hazard. Social Science Research Network Electronic Journal. 111(2).
http://dx.doi.org/10.2139/ssrn.2038105
Berenfeld. M. (2007). Disaster preparedness: How to develop a business continuity plan.
Infotech Update, 16(5), 5-6. Retrieved from https://rangrez.wordpress.com/2009
/08/11/disaster-preparedness-how-to-develop-a-business-continuity-plan/
Biedrzycki, P., & Koltun, R. (2012). Integration of social determinants of community
preparedness and resiliency in 21st century emergency management planning.
Homeland Security Affairs, 8(1), 1-8. Retrieved from http://www.hsaj.org
Born, P. H., & Klimaszewski-Blettner, B. (2013). Should I stay or should I go? Journal
of Risk and Insurance, 80(1), 1-36. http://dx.doi.org/10.1111/j.1539-6975.2012
.01477.x
Botha, J., & von Solms, R. (2004). A cyclical approach to business continuity
planning.Information Management and Computer Security, 12, 328-337.
http://dx.doi.org/10.1108/09685220410553541
139
Bowyer, D., & Davis, G. (2012). How to acquire aircraft? A grounded theory approach to
case study research. Qualitative Research in Accounting and Management, 9,
363-397. http://dx.doi.org/10.1108/11766091211282670
Bryman, A., & Bell, E. (2011). Business research methods (3rd ed.). New York, NY:
Oxford University Press Inc.
Burnaby, P. A., & Hass, S. (2011). Internal auditing in the Americas. Managerial
Auditing Journal, 26, 734-756. http://dx.doi.org/10.1108/02686901111161359
Burnaby, P. A., Hass, S., & Abdolmohammadi, M. J (2009). A global summary of
internal auditing common body of knowledge. Internal Auditing, 24(1), 13-26.
http://www.theiia.org
Busch, N. E., & Givens, A. D. (2013). Achieving resilience in disaster management: The
role of public-private partnerships. Journal of Strategic Security, 6(2), 1-19.
http://dx.doi.org/10.5038/1944-0472.6.2.1
Calderon, T. G., (2003). Assurance and recovery cost optimization in business continuity
planning. Internal Auditing, 18(2), 20-29. Retrieved from http://www.iia.org.au
/technicalresources/internalAuditorMagazine.aspx
Camara, S., Crossler, R., Midha, V., & Wallace, L. (2011). Teaching case: Bank
solutions disaster recovery and business continuity: A case study for business
students. Journal of Information Systems Education, 22, 117-122. Retrieved from
http://www.cis.gsu.edu/rbaskerville/cis8630/cases/banksolutions.pdf
Campbell, A. (2013). Top 10: Operational risks 2013. Operational Risk & Regulation,
13(12), 32-39. Retrieved from http://www.risk.net/operational-risk.../top-10-
operational-risks-for-2013
Carrington, C.M. (2010). Avoiding disaster before it strikes. Retrieved from
http://www.multichannel.com/content/avoiding-disaster-it-strikes
Carson, J. M., McCullough, K., & Pooser, D. M. (2013). Deciding whether to invest in
mitigation measures: Evidence from Florida. Journal of risk and insurance, 80.
308-327. http://dx.doi.org/10.1111/j.1539-6975.2012.01484.x
Cascardo, D. (2012). Preparing your practice for any emergency scenario: Your practice
continuity plan. The Journal of Medical Practice Management, 27, 199-202.
Retrieved from https://www.greenbranch.com/store/index.cfm/product/4_31/the-
journal-of-medical-practice-management.cfm
Cascardo, D. (2013). Learning to live with volatility: Preparing for business continuity
and recovery following a disaster. The Journal of Medical Practice Management,
28, 282-285. Retrieved from http://www.biomedsearch.com/nih/Learning-to-live-
with.../23767119.html
140
Cereola, S. J., & Cereola, R. J. (2011). Breach of data at TJX: An instructional case used
to study COSO and COBIT, with a focus on computer controls, data security, and
privacy legislation. Issues in Accounting Education, 26(3), 521-545.
http://dx.doi.org/10.2308/iace-50031
Chambers, A. D. (2014). New guidance on internal audit - an analysis and appraisal of
recent developments. Managerial Auditing Journal, 29, 196-218. http://dx.doi.org
/10.1108/maj-08-2013-0925
Chamlee-Wright, E. (2010). Expectations of response to disaster. Public Choice, 144(1),
253-274. http://dx.doi.org/10.1007/s11127-009-9516-x
Chandra, A., Williams, M., & Tang, J. (2013). Getting actionable about community
resilience: The Los Angeles county community disaster resilience project.
American Journal of Public Health, 103, 1181-1189. Retrieved from
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC3682620/
Chang, S.-I., Huang, S.-M., Roan, J., Chang, I.-C., Ying, P.-J. (2014). Developing risk
management assessment framework for public administration in Taiwan. Risk
Management, 16, 164-194. http://dx.doi.org/10.1057/rm.2014.9
Chang, Y., Wilkinson, S., Potangaroa, R., & Seville, E. (2012). Managing resources in
disaster recovery projects. Engineering, Construction and Architectural
Management, 19, 557-580. http://dx.doi.org/10.1108/09699981211259621
Chen, C.-Y., & Lee, W.-C. (2012). Damages to school infrastructure and development to
disaster prevention education strategy after typhoon Morakot in Taiwan. Disaster
Prevention and Management, 21, 541-555. http://dx.doi.org/10.1108
/09653561211278680
Christopher, C., Sarens, G., & Leung, P. (2009). A critical analysis of the independence
of the internal audit function: evidence from Australia. Accounting, Auditing &
Accountability Journal, 22, 200-220. http://dx.doi.org/10.1108
/09513570910933942
Coles, J., & Zhuang, J. (2011). Decisions in disaster recovery operations: A game
theoretic perspective on organization cooperation. Journal of Homeland Security
and Emergency Management, 8(1), 1-14. doi:10.2202/1547-7355.1772
Converse, M. (2012). Philosophy of phenomenology: How understanding aids research.
Nurse Researcher, 20(1), 28-32. Retrieved from
http://dx.doi.org/10.7748/nr2012.09.20.1.28.c9305
Cox, R. S., & Perry, K. E. (2011). Like a fish out of water: Reconsidering disaster
recovery and the role of place and social capital in community disaster resilience.
American Journal of Community Psychology, 48, 395-411. http://dx.doi.org/10
.1007/s10464-011-9427-0
141
Creswell, J. W. (2014). Research design: Qualitative, quantitative, and mixed methods
approaches (4th ed.). Thousand Oaks, CA: Sage.
Crowe, S., Creswell, K., Robertson, A., Huby, G., Avery, A. & Sheikh, A. (2011). The
case study approach. BMC Medical Research Methodology, 11(100).
http://dx.doi.org/10.1186/1471-2288-11-100
Darrough, M.N. (2010). The FCPA and the OECD convention: Some lessons from the
U.S. experience. Journal of Business Ethics, 93, 255-276. http://dx.doi.org./10
.1007/s10551-009-0219-5
Davison, C. B. (2014). Selected leadership demographics as predictors of continuity
planning. Disaster Prevention and Management, 23, 243-251. http://dx.doi.org
/10.1108/dpm-08-2013-0140
Day, J. M., Melnyk, S. A., Larson, P. D., Davis, E. W., & Whybark, D. C. (2012).
Humanitarian and disaster relieve supply chains: A matter of life and death.
Journal of Supply Chain Management, 48(2), 21-36. http://dx.doi.org/10.1111/j
.1745-493X.2012.03267.x
Department of Homeland (DHS). (2006). Nationwide plan review phase 2 report.
Retrieved from http://www.dhs.gov/xlibrary/assets/Prep_NationwidePlanReview
Department of Homeland (DHS). (2008). National response framework. Retrieved from
http://www.fema.gov/pdf/emergency/nrf/nrf-core.pdf
Department of Homeland (DHS). (2011a). Implementing 9/11 commission
recommendations. Retrieved from http://www.dhs.gov/xlibrary/assets
/implementing-9- 11-commission-report-progress-2011.pdf
Department of Homeland (DHS). (2011b). National preparedness goal. Retrieved from
http://www.fema.gov/media-library-data/20130726-1828-25045-
9470/national_preparedness_goal_2011.pdf
Department of Homeland (DHS). (2013a). Preparedness planning for your business.
Retrieved from http://www.ready.gov/business
Department of Homeland (DHS). (2015). Introduction to continuity of operations.
Retrieved from https://training.fema.gov/is/courseoverview.aspx?code=IS-547.a
Desai, R., & Roberts, R. W. (2013). Deficiencies in the code of conduct: The AICPA
rhetoric surrounding the tax return preparation outsourcing disclosure rules.
Journal of Business Ethics, 114, 457-471. http://dx.doi.org/10.1007/s10551-012-
1329-z
142
De Smet, H., Lagadec, P., & Leysen, J. (2012). Disasters out of the box: A new
ballgame? Journal of Contingencies and Crisis Management, 20(3), 138-148.
doi:10.1111/j.1468-5973.2012.00666.x
De Turck, F., Kiriha, Y., & Hong, J. W.-K. (2012). Management of the future internet:
Status and challenges. Journal of Network and Systems Management, 20, 616-
624. http://dx.doi.org/10.1007/s10922-012-9245-1
Deverell, E. (2012). Investigating the roots of crisis management studies and outlining
future trajectories for the field. Journal of Homeland Security and Emergency
Management, 9(1), 1-18. doi:10.1515/1547-7355.24
de Zwaan, L., Stewart, J., & Subramaniam, N. (2011). Internal audit involvement in
enterprise risk management. Managerial Auditing Journal, 26, 586-604.
http://dx.doi.org/10.1108/02686901111151323
Dickey, P. K., Schwagel, T., & White, S. (2006). In the event of disaster, Internal
Auditor: Journal of the Institute of Internal Auditors, 63, 89-93. Retrieved from
https://na.theiia.org/periodicals/Pages/Internal-Auditor-Magazine.aspx
Dickins, D., & Daughterty, B. (2012). Should those charged with corporate governance
care about auditor offshoring? International Journal of Disclosure and
Governance, 9(1), 52-61. http://dx.doi.org/10.1057/jdg.2011.11
Dickins, D., & Reisch, J. T. (2012). Enhancing auditors' ability to identify opportunities
to commit fraud: Instructional resource cases. Issues in Accounting Education, 27,
1153-1169. http://dx.doi.or/ 10.2308/iace-50178
Ditch, R. L. (2014). [Review of the book, The business of counterterrorism. Public-
private partnerships in homeland security, by N. E. Busch & A. D. Givens].
Journal of Strategic Security, 7(3), 100-101. http://dx.doi.org/10.5038/1944-
0472.7.3.8
Donahue, D. A., Cunnion, S. O., Balaban, C. D., & Sochats, K. (2012). The all needs
approach to emergency response. Homeland Security Affairs, 8, Art. 1. Retrieved
from https://www.hsaj.org/articles/204
Dowling, M., & Cooney, A. (2012). Research approaches related to phenomenology:
Negotiating a complex landscape. Nurse Researcher, 20(2), 21-27. Retrieved from
http://dx.doi.org/10.7748/nr2012.11.20.2.21.c9440
D’Onza, G., Selim, G. M., Melville, R., & Allegrini, M. (2015). A study on internal
auditor perceptions of the function ability to add value. International Journal of
Auditing, 19, 182-194. http://dx.doi.org/10.1111/ijau.12048
143
Drost, E. A. (2011). Validity and reliability in social science research. Education
Research and Perspectives, 38, 105-124. Retrieved from
http://www.erpjournal.net/wp-content/uploads/2012/07/ERPV38-1.-Drost-E.-
2011.-Validity-and-Reliability-in-Social-Science-Research.pdf
Dudin, E. B., & Smetanin, Y. G. (2011). A review of cloud computing. Scientific and
Technical Information Processing, 38, 280-284. http://dx.doi.org/10.3103
/S0147688211040083
The E-Government Act of 2002, Pub. L. 107-347, 116 Stat. 2899, 44 U.S.C. § 101
(2002).
Elmore, T. P. (2013). The role of internal auditors in creating an ethical culture. The
Journal of Government Financial Management, 62(2), 48-53. Retrieved from
https://www.agacgfm.org/Resources/Journal-of-Government-Financial-
Management.aspx
Elo, S., & Kyngas, H. (2008). The qualitative content analysis process. Journal of
Advanced Nursing, 62(1), 107-115. http://dx.doi.org/10.1111/j.1365-2648.2007
.04569.x
Epstein, P. D. (2010). Auditor roles in government performance management.
Government Finance Review, 26(6), 51-55. Retrieved from gfoa.org/gfr
Erickson, P. A. (2006). Emergency response planning for corporate and municipal
managers (2nd ed.). Burlington, MA: Butterworth-Heinemann.
Eriksson, K. (2009). Knowledge transfer between preparedness and emergency response:
A case study. Disaster Prevention and Management, 18(2), 162-169.
doi:10.1108/09653560910953234
Essers, J. (2012). RE-writing the organization: The ideological deadlock of narrative
methodology. Journal of Organizational Change Management, 25, 332-351.
http://dx.doi.org/10.1108/09534811211213991
Expedited Funds Availability Act, 41 U.S.C. 12 § 229 (1987).
Faith, K., Jackson, B. A., & Willis, H. (2011). Text analysis of after action reports to
support improved emergency response planning. Journal of Homeland Security
and Emergency Management, 8(1), 1-16. http://dx.doi.org/10.2202/1547-7355
.1900
Farber, D. (2011). Symposium introduction: Navigating the intersection of environmental
law and disaster law. Brigham Young University Law Review, 2011, 1783-1820.
Retrieved from http://digitalcommons.law.byu.edu/lawreview/
Farley, T. A., & Weisfuse, I. (2011). Redefining of public health preparedness after 9/11.
The Lancet, 378, 957-959. http://dx.doi.org/10.1016/s0140-6736(11)60969-0
144
Federal Emergency Management Agency (FEMA). (2009). Handbook for rapid visual
screening of buildings to evaluate terrorism risks (FEMA 455). Retrieved from
http://www.fema.gov/media-library-data/20130726-1457-20490-8140/01_fema
_455_cvr_frwd_ack_toc.pdf
Federal Emergency Management Agency (FEMA). (2015). What is Mitigation? Who
benefits from it? Retrieved from http://www.fema.gov/whobenefitsfrom it
Finlay, L. (2009). Debating phenomenological research methods. Phenomenology &
Practice, 3(1), 6-25. Retrieved from http://www.psyking.net/HTMLobj-3824
/Debating_Phenomenological_Research_Methods.pdf
Finlayson, K. W., & Dixon, A. (2008). Qualitative meta-synthesis: A guide for the
novice. Nurse Researcher, 15(2), 59-71. http://dx.doi.org/10.7748/nr2008.01.15
.2.59.c6330
Flood Disaster Protection Act of 1973, 42 U.S.C. 4001 et seq. (1973).
Foreign Corrupt Practices Act, Pub. L. 95-213, 91 Stat. 1494 (1977).
Four emerging business continuity trends identified in new ISACA White Paper. (2012,
December 27). Retrieved from http://www.apnnews.com/2012/12/28/four-
emerging-business-continuity-trends-identified-in-new-isaca-white-paper/
Franck, P., & Sundgren, S. (2012). Determinants of internal governance quality:
Evidence from Sweden. Managerial Auditing Journal, 27, 639-665.
http://dx.doi.org/10.1108/02686901211246796
Friedman, J. (2014, June 23). Mission-critical business continuity and disaster recovery
strategies. Retrieved from http://www.propertycasualty360.com/2014/.../mission-
critical-business-continuity
Garcia, A. (2008, November 7). Business continuity: Best practices. eWeek. Retrieved
from http://www.eweek.com/c/a/IT-Management/Business-Continuity-Best-
Practices
García, L. S., Barbadillo, E. R., & Pérez, M. O. (2012). Audit committee and internal
audit and the quality of earnings: Empirical evidence from Spanish companies.
Journal of Management & Governance, 16, 305-331. http://dx.doi.org/10.1007
/s10997-010-9152-3
Gauthier, S. J. (2007). A new vision for public sector audit committees. Government
Finance Review, 23(2), 10-16. Retrieved from https://www.alamo.edu
/uploadedFiles/District/Employees/Departments/Internal_Audit/Files/A-New-
Vision-for-Public-Sector-AuditCommittees-GFR_apr07.pdf
Geale, S.K. (2012). The ethics of disaster management. Disaster Prevention and
Management, 21, 445-462. http://dx.doi.org/10.1108/09653561211256152
145
Ghezzi, A., Georgiades, M., Reichl, P., Le-Sauze, N., Cairano, C. D., & Managiaracina,
R. (2013). Generating innovative interconnection business models for the future
internet. Info : The Journal of Policy, Regulation and Strategy for
Telecommunications, Information and Media, 15(4), 43-68.
http://dx.doi.org/10.1108/info-12-2012-0054
Glaser, B. G., & Strauss, A. L. (1967). The discovery of grounded theory: Strategies for
qualitative research. New York, NY: Aldine de Gruyter.
Glendon, L. (2013). A winning combination: The 3Cs of business continuity. Journal of
Business Continuity & Emergency Planning, 7(1), 44-55. Retrieved from
http://henrystewart.metapress.com/link.asp?id=n5w44972k75l2351
Goldberg, E. (2013). Preventing a data breach from becoming a disaster. Journal of
Business Continuity & Emergency Planning, 6, 295-303. Retrieved from
http://henrystewart.metapress.com/link.asp?id=85163430476442hj
Goudsmit, F. (2012. Disaster planning for biotechnology companies. Journal of
Commercial Biotechnology, 18(3), 58-61. http://dx.doi.org/10.5912/jcb.529
Gourio, F. (2012). Disaster risk and business cycles. The American Economic Review,
102, 2734-2766. http://dx.doi.org/10.1257/aer.102.6.2734
Grimaila, M. R., & Badiru, A. (2013). A hybrid dynamic decision making methodology
for defensive information technology contingency measure selection in the
presence of cyber threats. Operational Research, 13, 67-88. http://dx.doi.org/10
.1007/s12351-010-0102-2
Grosskopf, K. R. (2010). Disaster preparedness: How to develop a business continuity
plan. International Journal of Disaster Resilience, 1, 322-335. http://dx.doi.org/10
.1108/17595901011080904
Gruiescu, M., Ioanăş, C., & Morega, D. D. (2010). The risk connection of an organization
with internal audit. Specific corporate governance practices. Romanian Economic
and Business Review, 5, 258-270. Retrieved from http://www.rebe.rau.ro/RePEc
/rau/journl/FA10/REBE-FA10-A20.pdf
Gunnec, D., & Salman, F. S. (2011). Assessing the reliability and the expected
performance of a network under disaster risk. OR Spectrum. 33, 499-523.
http://dx.doi.org/10.1007/s00291-011-0250-7
Guster, D. C., Lee,O. F., & McCann, B. P. (2012). Outsourcing and replication
considerations in disaster recovery planning. Disaster Prevention and
Management, 21, 172-183. http://dx.doi.org/101108/09653561211219982
Guxholli, S., Karapici, V., & Gjinopulli, A. (2012). Corporate governance and audit.
China - USA Business Review, 11(2) Retrieved from http://www.davidpublishing
.org
146
Haddow, G. D., Bullock, J. A., & Coppola, D. P. (2011). Introduction to emergency
management (4th ed.). Burlington, MA: Butterworth-Heinemann.
Hall, D. J., Skipper, J. B., Hazen, B. T., & Sawalha, J. B. (2012). Inter-organizational IT
use, cooperative attitude, and inter-organizational collaboration as antecedents to
contingency planning effectiveness. International Journal of Logistics
Management, 23(1), 50-76. http://dx.doi.org/10.1108/09574091211226920
Haque, U., Hashizume, M., Kolivras, K. N., Overgaard, H. J., Das, B., & Yamamoto, T,
(2012). Reduced death rates from cyclones in Bangladesh: What more needs to be
done? Bulletin of the World Health Organization, 90, 150-156. http://dx.doi.org
/10.2471/blt.11.088302
Hartel, C. E. J., & Latemore, G. (2011). Mud and tears: The human face of disaster—A
case study of the Queensland floods. Journal of Management and Organization,
17, 864-872. http://dx.doi.org/10.5172/jmo.2011.864
Health Insurance Portability and Accountability Act of 1996, Pub. L. 104-191, 110 Stat.
1936 (1996).
Heller, N. A. (2012). Leadership in crisis: An exploration of the British Petroleum case.
International Journal of Business and Social Science, 3(18) Retrieved from
http://ijbssnet.com/journals/Vol_3_No_18_Special_Issue_September_2012/4.pdf
Hemond, Y., & Benoit, R. (2012). Preparedness: the state of the art and future prospects.
Disaster Prevention and Management, 21, 404-417. http://dx.doi.org/10.1108
/09653561211256170
Henstra, D. (2010). Evaluating local government emergency management programs:
What framework should public managers adopt? Public Administration Review,
70, 236-246. http://dx.doi.org/10.1111/j.1540-6210.2010.02130.x
Herbane, B. (2010). The evolution of business continuity management: A historical
review of practices and drivers. Business History, 52, 978-1002. http://dx.doi.org
/10.1080/00076791.2010.511185
Hickman, K. E. (2012). Navigating a transition in U.S. tax administration. EJournal of
Tax Research, 10(2), 329-344. Retrieved from
http://search.proquest.com.proxy1.ncu.edu/docview/1115475928?accountid=2818
0
Hicks, L. (2011). Informed consent. Retrieved from https://www.citiprogram.org/
Holt,T. P. (2012). The effects of internal audit role and reporting relationships on investor
perceptions of disclosure credibility. Managerial Auditing Journal, 27, 878-898.
http://dx.doi.org/10.1108/02686901211263085
147
Hoong, L. L., & Marthandan, G. (2014). Critical dimensions of disaster recovery
planning. International Journal of Business and Management, 9(12), 145-158.
http://dx.doi.org/10.5539/ijbm.v9n12p145
Houston, J. B., Pfefferbaum, B., & Rosenholtz, C. E. (2012). Disaster news: Framing and
frame changing in coverage of major U.S. natural disasters, 2000-2010.
Journalism and Mass Communication Quarterly, 89, 606-623.
http://dx.doi.org/10.1177/1077699012456022
Hosban, A., & Hamdan, M. N. (2015). Role for internal auditor to cope with IT risks and
IT infrastructure in Jordan commercial banks. International Journal of Business
and Management, 10, 295-304. http://dx.doi.org/10.5539/ijbm.v10n3p295
Information Systems Audit and Control Association (ISACA). (2012). Business
continuity management: Emerging trends. Retrieved from
http://www.infosecurityeurope.com/_novadocuments/48836?v=63530773729483
0000
Izumi, T., & Shaw, R. (2015). Disaster risk reduction, method, approaches, and practices.
Disaster Management and Private Sectors: Challenges and Potentials.
http://dx.doi.org/10.1007/978-4-431-55414-1_1
Jahangiri, K., Izadkhah, Y. O., & Seyed, J. T. (2011). Disaster prevention and
management. Public Health and Safety, 20, 82-94. http://dx.doi.org/10.1108
/09653561111111108
Jalba, L. G. (2013). Management and internal audit in the current context. Knowledge
Horizons.Economics, 5, 118-121. Retrieved from http://www.orizonturi.ucdc.ro
/arhiva/2013_KHE_PDF_Vol_5_SI_1/KHE_Vol_5_SIss_1_118to121.pdf
Jan, A., & Lurie, N. (2012). Disaster resilience and people with functional needs. The
New England Journal of Medicine, 367, 2272-2273. http://dx.doi.org/10.1056
/nejmp1213492
Jarvelainen, J. (2012). Information security and business continuity management in
interorganizational IT relationships. Information Management & Computer
Security, 20, 332-349. http://dx.doi.org/10.1108/09685221211286511
Jensen, J. (2011). The current NIMS implementation behavior of the United States
counties. Journal of Homeland Security and Emergency Management, 8(1), 1-25.
http://dx.doi.org/10.2202/1547-7355.1815
Jeya, J. J., & Kannan, E. (2014). Efficient ranked and secure file retrieval in cloud
computing. American Journal of Applied Sciences, 11, 906-911. http://dx.doi
.org/10.3844/ajassp.2014.906.911
148
Johnsen, S. O., & Veen, M. (2013). Risk assessment and resilience of critical
communication infrastructure in railways. Cognition, Technology & Work, 15, 95-
107. http://dx.doi.org/10.1007/s10111-011-0187-2
Johnson, P. (2010, June 1). Government's growing role could be an opportunity for
comms strategists. PRweek. Retrieved from http://www.prweek.com/article
/governments-growing-role-opportunity-comms-strategists/1267552
Johnston, D., Becker, J., & Paton, D. (2012). Multi-agency community engagement
during disaster recovery. Disaster Prevention and Management, 21, 252-268.
http://dx.doi.org/10.1108/09653561211220034
Jones, V.A. (2011). How to avoid disaster: RIM’s crucial role in business continuity
planning. Information Management, 45(6). 36-40. Retrieved from http://content
.arma.org/IMM/November-December2011/rimfundamentalshowtoavoiddisaster
.aspx.
Kamel, H., & Elkhatib, S. (2013). The perceptions of audit committees' role in an
emerging market: The case of Egypt. Journal of Economic and Administrative
Sciences, 29, 85-98. http://dx.doi.org/10.1108/jeas-09-2013-0028
Kanellou, A., & Spathis, C. (2011). Auditing in enterprise system environment: A
synthesis. Journal of Enterprise Information Management, 24, 494-519.
http://dx.doi.org/10.1108/17410391111166549
Kantur, D., & Arzu, I. (2012). Organizational resilience: A conceptual integrative
framework. Journal of Management and Organization, 18, 762-773.
http://dx.doi.org/10.5172/jmo.2012.18.6.762
Karim, A.J. (2011). Business disaster preparedness: An empirical study for measuring the
factors of business continuity to face business disaster. International Journal of
Business and Social Science, 2(18). Retrieved from http://ijbssnet.com/journals
/Vol_2_No_18_October_2011/23.pdf
Kent, P. (2011). The decision to outsource management advisory services. Managerial
Auditing Journal, 26, 672-696. http://dx.doi.org/10.1108/02686901111161331
Klein, H. K. (2012). Principles for insurance regulation: An evaluation of current
practices and potential reforms. Geneva Papers on Risk & Insurance, 37(1), 175-
199. http://dx.doi.org/10.1057/gpp.2011.9
Koronis, E., & Ponis, S. T. (2012). Introducing corporate reputation continuity to support
organizational resilience against crises. Journal of Applied Business Research, 28,
283-290. http://dx.doi.org/10.19030/jabr.v28i2.6850
Kotb, A., Sangster, A., & Henderson, D. (2014). E-business internal audit: The elephant
is still in the room! Journal of Applied Accounting Research, 15, 43-63.
http://dx.doi.org/10.1108/jaar-10-2012-0072
149
Krishnan, G. V., &Yu, W. (2012). Do small firms benefit from auditor attestation of
internal control effectiveness. Auditing: A Journal of Practice and Theory, 31(4),
115-137. http://dx.doi.org/10.2308/ajpt-50238
Kruger,S. (2009). Local emergency management funding: An evaluation of county
budgets. Journal of Homeland Security and Emergency Management, 6(1),
Article 43. http://dx.doi.org/10.2202/1547-7355.1434
Kunreuther, H., & Michel-Kerjan, E. (2011). People get ready disaster preparedness.
Issues in Science and Technology, 28(1), 39-50. Retrieved from
http://opim.wharton.upenn.edu/risk/library/J2011IST_PeopleGetReady.pdf.
Kusumasari, B., Alam, Q., & Siddiqui, K. (2010). Resource capability for local
government in managing disaster. Disaster Prevention and Management, 19, 438-
451. http://dx.doi.org/10.1108/09653561011070367
Lasecki, A. J. (2009). Assessing and exploring strategic business continuity planning
methods in Michigan small businesses (Doctoral dissertation). Retrieved from the
ProQuest Theses and Dissertations database. (UMI No. 3368182)
Law, M. D., & Robson, G. (2014). A case study for accounting information systems - A
business continuity plan for protecting critical financial information in the NYC
financial services industry. The Review of Business Information Systems, 18(1),
15-22. http://dx.doi.org/10.19030/rbis.v18i1.8539
Lee, A. C. K., Booth, A., Challen, K., Gardois, P., & Goodacre, S. (2014). Disaster
management in low- and middle-income countries: Scoping review of the
evidence base. Emergency Medicine Journal: EMJ, 31. http://dx.doi.org/10.1136
/emermed-2013-203298
Lee, K., Lan, L., Wang, J., Fang, C., & Shiao, K. (2014). How to reduce the latent social
risk of disease: The determinants of vaccination against rabies in Taiwan.
International Journal of Environmental Research and Public Health, 11, 5934-
5950. http://dx.doi.org/10.3390/ijerph110605934
Lehman, C.M. (2010). Issues in accounting education. American Accounting Association,
25(4), 741-754. http://dx.doi.org/10.2308/iace.2010.25.4.741
Lenz, R., & Sarens, G. (2012). Reflections on the internal auditing profession: What
might have gone wrong? Managerial Auditing Journal, 27, 532-549.
http://dx.doi.org/10.1108/02686901211236382
Lester, S. A. G., & Persia, A. M. (2011). Disaster risk reduction for health facilities in the
Western Pacific Region. International Journal of Disaster Resilience in the Built
Environment, 2, 268-277. http://dx.doi 10.1108/17595901111167132
150
Leung, P., Cooper, B. J., & Perera, L. (2011). Accountability structures and management
relationships of internal audit. Managerial Auditing Journal, 26. 794-816.
http://dx.doi.org/10.1108/02686901111171457
Leverty, J.T. (2012). The cost of duplicative regulation: Evidence from risk retention
groups. Journal of Risk and Insurance, 79, 105-127. http://dx.doi.org/10.1111/j
.1539-6975.2011.01437.x
Lindell, M. K., Prater, C., & Perry, R. W. (2007). Introduction to emergency
management. Hoboken, NJ: Wiley and Sons.
Lindberg, D. L., & Seifert, D. L. (2011). Enterprise risk management (ERM) can assist
insurance in complying with the Dodd-Frank Act. Journal of Insurance
Regulation, 30, 319-337. Retrieved from http://www.naic.org/prod_serv_jir.htm
Lindström, J. (2012). A model to explain a business contingency process. Disaster
Prevention and Management, 12, 269-281. http://dx.doi.org/10.1108
/09653561211220052
Lindström, J., Samuelson, S., & Hägerfors, A. (2010). Business continuity planning
methodology. Disaster Prevention and Management, 19, 243-255.
http://dx.doi.org/10.1108/09653561011038039
Luftman, J., & Zadeh, H. S. (2011). Key information technology and management issues.
Journal of Information Technology, 26, 193-204. http://dx.doi.org/10.1057/jit
.2011.3
Malalgoda, C., Amaratunga, D., & Haigh, R. (2013). Creating a disaster resilient built
environment in urban cities. International Journal of Disaster Resilience in the
Built Environment, 4, 72-94. http://dx.doi.10.1108/17595901311299017
Marques, M. d. C. d. C. (2014). Internal audit in the public sector as a tool for risk
prevention of corruption in public administration in Portugal. Business and
Management Research, 3(3), 1-10. http://dx.doi.org/10.5430/bmr.v3n3p43
Marsh, T., Fischer, M., & Montondon, L.(2013). Government’s new normal: A changing
role for auditors. The Journal of Government Financial Management, 62(3), 12-
17. Retrieved from http://www.howtomanuals.net/how-are-governments-coping-
with-the-new-normal-tgd.html?page=6
Matuk, J., & Young, B. (2011). Records-based research. Retrieved from
https://www.citiprogram.org/
Maurice, J. (2013). Mitigating disasters—a promising start. The Lancet, 381, 1611-1613.
http://dx.doi.org/10.1016/S0140-6736(13)61008-9
151
McEntire, D. (2012). Understanding and reducing vulnerability: from the approach of
liabilities and capabilities. Disaster Prevention and Management, 21(2), 206-255.
http://dx.doi.org/10.1108/09653561211220007
McGrady, E., & Blanke, S. J. (2014). Twelve best practices to mitigate risk through
continuity planning and a scorecard to track success. Journal of Management
Policy and Practice, 15(3), 11-19. Retrieved from http://www.na-businesspress
.com/JMPP/McGradyE_Web15_3_.pdf
McGuire, M., & Schneck, D. (2010). What if hurricane Katrina hit in 2020? The need for
strategic management of disasters. Public Administration Review, 70, S201-S207.
http://dx.doi.org/10.1111/j.1540-6210.2010.02273.x
Medders, L., McCullough, K., & Jäger, V. (2011). Tale of two regions: Natural
catastrophe insurance and regulation in the United States and the European Union.
Journal of Insurance Regulation, 30(1), 171-196
Mekdeci, K. B. (2011). Educational technology: Transitioning from business continuity
to mission continuity (Doctoral dissertation, Lehigh University). Retrieved from
http://preserve.lehigh.edu/cgi/viewcontent.cgi?article=2179&context=etd
Melnik, T. (2015). New U.S. sanctions program seeks to give government an extra tool to
fight cyber-attacks. Journal of Health Care Compliance, 17(3), 53-56. Retrieved
from http://melniklegal.com/av/2015_05_JHCC_US_Sanctions.pdf
Mix, V. (2012). Renovation and roadblocks while protecting the collection. Collection
Building, 31, 153-157. http://dx.doi.org/10.1108/01604951211274061
Moeller, R. R. (2008). Sarbanes-Oxley and the new internal auditing rules (1st ed.).
Hoboken, NJ: Wiley
Momani, N.M. (2010). Business continuity planning: Are we prepared for future
disasters? American Journal of Economic and Business Administration, 2(3), 272-
279. Retrieved from http://thescipub.com/pdf/10.3844/ajebasp.2010.272.279.
Mukhtar, S. A. (2013). Organizational conflict management strategies on employee job
satisfaction: A conceptual relationship. International Journal of Management
Research and Reviews, 3, 2855-2862. Retrieved from http://ijmrr.com/admin
/upload_data/journal_SA%20Mukhtar%20%203may13mrr.pdf
Munro, D. (2011). The allocation of federal homeland Security grant funds in Riverside
county California (Doctoral dissertation). Retrieved from the Proquest Theses and
Dissertations database. (UMI No. 3443903)
Muqattash, R. (2011). The effect of the factors in the internal audit department on the
internal auditors objectivity in the bank operating in the United Arab Emirates.
Journal of International Management Studies, 6(3), 92-100. Retrieved from
http://www.iabe.org/domains/iabeX/journalinfo.aspx?JournalID=JIMS
152
Nasim, S., & Sushil. (2010). Managing continuity and change: A new approach for
strategizing in e-government. Transforming Government: People, Process and
Policy, 4(4), 338-364. http://dx.doi.org/10.1108/17506161011081327
Năstase, P., & Unchiaşu, S. F. (2013). Implications of the operational risk practices
applied in the banking sector on the information systems area. Accounting and
Management Information Systems, 12(1), 101-117. Retrieved from
http://www.cig.ase.ro/articles/12_1_6.pdf
Nicoll, S. R., & Owens, R. W. (2013). Emergency response and business continuity.
Professional Safety, 50-55. Retrieved from http://www.asse.org
/professionalsafety/pastissues/058/09/F1Nic_0913.pdf.
Niemimaa, M., & Jarvelainen, J. (2013). IT service continuity: Achieving embeddedness
through planning. In availability, reliability, and security (ARES), 2013 Eighth
International Conference, 333-340. http://dx.doi.org/10.1109/ares.2013.45
Nor Azimah, A. A. (2013). Managing corporate risk and achieving internal control
through statutory compliance. Journal of Financial Crime, 20(1), 25-38.
http://dx.doi.org/10.1108/13590791311287328
Novriansa, A., & Riyanto, B. (2016). Role conflict and role ambiguity on local
government internal auditors: the determinant and impacts. Journal of Indonesian
Economy and Business, 31, 63-82. Retrieved from http://jurnal.ugm.ac.id/jieb
NYSE Corporate Governance Listing Standards (2013). Section 303A of the NYSE's
Listed. Retrieved from https://www.nyse.com/pdfs/section303A_final_rules.
Odoyo, F. S., Omwono, G. A., & Okinyi, N. O. (2014). An analysis of the role of internal
audit in implementing risk management: A study of state corporations in Kenya.
International Journal of Business and Social Science, 5(6), 169-176. Retrieved
from http://www.ijbssnet.com/journals/vol_5_no_6_may_2014/18.pdf.
Office of Management & Budget (2011). Federal Register 76(123), 56227-56242.
Retrieved from http://www.gpo.gov/fdsys/pkg/FR-2011-09-12/pdf/2011-
23165.pdf
Oh, N. (2012). Strategic uses of lessons for building collaborative emergency
management system: Comparative analysis of Hurricane Katrina and Hurricane
Gustav response systems. Journal of Homeland Security and Emergency
Management, 9(1), 1-20. http://dx.doi.org/10.1515/1547-7355.1765
Ojha, D., Gianiodis, P. T., & Manuj, I. (2013). Impact of logistical business continuity
planning on operational capabilities and financial performance. International
Journal of Logistics Management, 24, 180-209. http://dx.doi.org/10.1108/ijlm-06-
2012-0049
153
Ojha, D., & Gokhale, R.A. (2009). Logistical business continuity planning-scale
development and validation. International Journal of Logistics Management, 20,
342-359. http://dx.doi.org/10.1108/09574090911002814
Omar, A., Alijani, D., & Mason, R. (2011). Information technology disaster recovery
plan: case study. Academy of Strategic Management Journal, 10, 127-141.
Retrieved from http://suno.edu/Chancellor/docs/SUNO2010-
2011AnnualReport.pdf.
Ostrander, I., & Lowry, W. R. (2012). Oil crises and policy continuity: A history of
failure to change. Journal of Policy History, 24, 384-404. http://dx.doi.org/10
.1017/S0898030612000115
Palliyaguru, R., Amaratunga, D., & Haigh, $. (2010). Integration of “disaster risk
reduction” into infrastructure reconstruction sector: Policy vs practice gaps.
International Journal of Disaster Resilience in the Built Environments, 1, 277-
296. http://dx.doi.org/10.1108/17595901011080878
Pang, Y., & Li, Q. (2013). Game analysis internal control and risk management.
International Journal of Business and Management, 8(17), 103-111.
http://dx.doi.org/10.5539/ijbm.v8n17p103
Parker, R. (2011). All-hazards resilience: A paradigm for the 21st century. Defence S&T
Technical Bulletin, 4(1), 56-63. Retrieved from http://www.myjurnal.my
Pathirage, C., Seneviratne, K., Amaratunga, D., & Haigh, R. (2012). Managing disaster
knowledge: Identification of knowledge factors and challenges. International
Journal of Disaster Resilience in the Built Environment, 3, 237-252.
http://dx.doi.org/10.1108/17595901211263620
Patterson, O., Weil, F., & Patel, K. (2010), The role of community in disaster response:
Conceptual models. Population Research and Policy Review, 29, 127-141.
http://dx.doi.org/10.1007/s11113-009-9133-x
Patton, M. Q. (2002). Qualitative research & evaluation methods (3rd ed.). Thousand
Oaks, CA: Sage.
Paul, D. (2012). Informed consent. Retrieved from https://www.citiprogram.org/
Pearson, D. D. R. (2010). Business continuity management in local government
(Victorian Auditor-General’s report, PP No. 355, Session 2006-10). Retrieved
from http://www.audit.vic.gov.au/publications/2010-11/20100109-bus-cont-full-
report.pdf
Pelfrey, W. V., Sr., & Kelley, W. D., Jr. (2013). Homeland security education: A way
forward. Homeland Security Affairs, 9, Art. 3. Retrieved from https://www.hsaj
.org/articles/235
154
Pheng, L. S, Ying, L. J., & Kumaraswamy, M. (2010). Institutional compliance
framework and business continuity management in mainland China, Hong Kong
SAR and Singapore. Disaster Prevention and Management, 19, 596-614.
http://dx.doi.org/10.1108/09653561011091922
Pierson, M. (2013). Characteristics of a knowledge harvesting and management system.
TechTrends, 57(2), 26-32. http://dx.doi.org/10.1007/s11528-013-0642-4
Pinta, J. (2011). Disaster recovery planning as part of business continuity management.
AGRIS on-Line Papers in Economics and Informatics, 3(4), 55-61. Retrieved
from http://purl.umn.edu/120243
Raman, M., Dorasamy, M., Muthaiyah, S., Kaliannan, M., & Muthuveloo, R. (2011).
Knowledge management for social workers involved in disaster planning and
response in Malaysia: An action research approach. Systemic Practice and Action
Research, 24, 261-272. http://dx.doi.org/10.1007/s11213-011-9193-9
Ramiah, V., & Graham, M. (2013). The impact of domestic and international terrorism
on equity markets: Evidence from Indonesia. International Journal of Accounting
and Information Management, 21, 91-107. http://dx.doi.org/10.1108
/18347641311299768
Randeree, K., Mahal, A., & Narwani, A. (2012). A business continuity management
maturity model for the UAE banking sector. Business Process Management
Journal, 18, 472-492. http://dx.doi.org/10.1108/14637151211232650
Reid, E., Waring, M., Enriquez, C. R., & Shivdas, M. (2012). Embracing disruptions,
responding to uncertainties, valuing agency: Situating a feminist approach to
social protection. Development, 55, 291-298. http://dx.doi.org/10.1057/dev.2012
.30
Renaud, C. (2012). The missing piece of NIMS: Teaching incident commanders how to
function in the edge of chaos. Homeland Security Affairs, 8(8), 1-19. Retrieved
from https://www.hsaj.org/articles/221
Resnick, M. D. (1987). Choices: An introduction to decision theory. Minneapolis, MN:
University of Minnesota Press.
Rodriguez, H., Quarantelli, E. L., & Dynes, R. (Eds.). (2007). Handbook of disaster
research. New York, NY: Springer.
Rosenberg, N. A. (2014). 10 Steps to implement a disaster recovery plan. Retrieved from
Quality Technology Solutions website: http://www.qtsnet.com/
Santos, R. S., Borges, M. R. S., Canós, J. H., & Gomes, J. O. (2011). The assessment of
information technology maturity in emergency response organizations. Group
Decision and Negotiation, 20, 593-613. http://dx.doi.org/10.1007/s10726-011-
9232-z
155
Sarbanes-Oxley Act of 2002, Pub. L. 107-204, 116 Stat. 745 (2002).
Sarens, G., Abdolmohammadi, M. J., & Lenz, R. (2012). Factors associated with the
internal audit function's role in corporate governance. Journal of Applied
Accounting Research, 13, 191-204. http://dx.doi.org/10.1108
/09675421211254876
Sawalha, I. H. S., Anchor, J. R., & Meaton, J. (2012). Business continuity management in
Jordanian banks: Some cultural considerations. Risk Management, 14, 301-324.
http://dx.doi.org/10.1057/rm.2012.10
Sawalha, I. H. S., Jraisat, L. E., & Al-Qudah, K. A. M. (2013). Crisis and disaster
management in Jordanian hotels: Practices and cultural considerations. Disaster
Prevention and Management, 22, 210-228. http://dx.doi.org/10.1108/dpm-09-
2012-0101
Schram, T. H. (2006). Conceptualizing and proposing qualitative research (2nd ed.).
Upper Saddle River, NJ: Pearson.
Seago, J., (2015). A new framework for a new age. Internal Auditor: Journal of the
Institute of Internal Auditors, 1-6. Retrieved from https://iaonline..theiia.org
/2015/a-new-framework-for a new age
Shank, G. D. (2006). Qualitative research a personal skills approach, Upper Saddle
River, NJ: Pearson Merrill Prentice Hall.
Schneider, G. P., Sheikh, A., & Simione, K. A. (2012). Holistic risk management: An
expanded role for internal auditors. Academy of Accounting and Financial Studies
Journal, 16(1), 25-33. Retrieved from www.alliedacademies.org/public/journals
/JournalDetails.aspx?jid=21
Scott, W. D., & Nganje, W. (2011). An ex-post evaluation of Sarbanes-Oxley Acton
firm’s intrinsic value: A principal-agent framework. Academy of Accounting and
Financial Studies Journal, 15(3), 95-118. Retrieved from
http://www.freepatentsonline.com/article/Academy-Accounting-Financial-
Studies-Journal/263035501.html
Shughart, W. F. (2011). Disaster relief as bad public policy. The Independent Review, 15,
519-539. Retrieved from http://www.independent.org/pdf/tir_15-04_2_shughart
Sinason, D. H. (2011). Internal audit lessons from the disaster in Japan. Internal
Auditing, 26(3), 3-8. Retrieved from
http://search.proquest.com.proxy1.ncu.edu/docview/872082216?accountid=28180
Smit, N. (2005). Business continuity management: A maturity model (Master’s thesis,
Erasmus University Rotterdam). Retrieved from http://docplayer.net/605903-
Business-continuity-management-a-maturity-model-by-naomi-smit.html
156
Smith, J. (2013). Strategic continuity planning: The first critical health policy and
management departments: Ensuring educational continuity step. Journal of
Business Continuity & Emergency Planning, 7(1), 6-12. Retrieved from
http://www.henrystewartpublications.com/jbcep.
Soh, S. B. D., & Martinov-Bennie, N. (2011). The internal audit function. Managerial
Auditing Journal, 26, 605-622. http://dx.doi.org/10.1108/02686901111151332
Soltani, B. (2014). The anatomy of corporate fraud: A comparative analysis of high
profile American and European corporate scandals. Journal of Business Ethics,
120, 251-274. http://dx.doi.org/10.1007/s10551-013-1660-z
Sorial, S. (2011). Politics of violence. Critical Horizons, 12, 163-164. http://dx.doi.org
/10.1558/crit.v12i2.163
SORM (2016). Continuity of operations. Retrieved from www.sorm.state.tx.us/coop
SORM (2016). Texas state agency continuity planning policy guidance letter. Retrieved
from www.sorm.state.tx.us/coop/texas-coop
Spremic, M., Jakovic, B., Braje, I. N., & Cavlek, N. (2013). The impact of the enterprise
resource planning systems on company's E-business efficiency. Journal of
American Business Review, Cambridge., 2(1), 276-282. Retrieved from
http://search.proquest.com.proxy1.ncu.edu/docview/1466276725?accountid=2818
0
Staley, J; Zelman,W., Porto, .J., Hobbs, S., & Paul, J. (2009). Preparedness roles for
health policy and management departments: Ensuring educational continuity
during disaster events. The Journal of Health Administration Education, 26(4),
309-321. Retrieved from http://www.aupha.org/publications
/journalofhealthadministrationeducation
Stallings, R. A. (2007). Methodologies issues. Methodological issues. In H. Rodriquez, E.
L. Quarantelli, & R. R. Dynes (Eds.), Handbook of disaster research (pp. 55-82).
New York, NY: Springer.
Stefaniak, C. M., Houston, R. W., & Cornell, R. M. (2012). The effects of employer and
client identification on internal and external auditors' evaluations of internal
control deficiencies. Auditing, 31, 39-56. http://dx.doi.org/10.2308/ajpt-10179
Sterbenz, J. P. G., Çetinkaya, E. K., Hameed, M. A., Jabbar, A., Qian, S., & Rohrer, J. P.
(2013). Evaluation of network resilience, survivability, and disruption tolerance:
Analysis, topology generation, simulation, and experimentation.
Telecommunication Systems, 52, 705-736. http://dx.doi.org/10.1007/s11235-011-
9573-6
157
Stewart, J., & Subramaniam, N. (2010). Internal audit independence and objectivity:
emerging research opportunities. Managerial Auditing Journal, 23, 328-360.
http://dx.doi.org/10.1108/02686901011034162
Sudmeier, K. I., Jaboyedoff, M., & Jaquet, S. (2013). Operationalizing "resilience" for
disaster risk reduction in mountainous Nepal. Disaster Prevention and
Management, 22, 366-377. http://dx.doi.org/10.1108/dpm-02-2013-0028
Sun, L. G. (2011). Smart growth in dumb places: Sustainability, disaster, and the future
of the American City. Brigham Young University Law Review, 2011, 2157-2201.
http://dx.doi.org/10.2139/ssrn.1918386
Suri, H. (2011). Purposeful sampling in qualitative research synthesis. Qualitative
Research Journal, 11(2), .63-75 http://dx.doi.org/10.3316/qrJ1102063
Texas State Auditor’s Office (2015). Texas State Internal Audit Contacts. Retrieved from
https:/www.sao.state.tx.us/Resources/IntAud/contacts.aspx
Texas Internal Auditing Act. (2003. Retrieved from
http://www.statutes.legis.state.tx.us/Docs/GV/htm/GV.2102.htm
Texas Legislature, 80th Legislative Session, Regular Session. (2007). Retrieved from
http://www.statutes.legis.state.tx.us/Docs/LA/htm/LA412.htm
Texas State Office of Risk Management. (2016). Continuity. Retrieved from
https://www.sorm.state.tx.us/coop
Thach, L. (2012). Managerial perceptions of crisis leadership in public and private
organizations: An interview study in the United States. International Journal of
Management, 29, 712-725. Retrieved from http://www.theijm.com/
Tudoran, L. E., & Ionescu, B. S. (2014). The use of accounting APPS via mobile cloud
computing in Romania. Annales Universitatis Apulensis : Series Oeconomica, 16,
294-303. http://dx.doi.org/10.13140/2.1.5050.2087
Turulj, L., & Bajgoric, N. (2012). Being prepared for disaster? Implementation of
business continuity planning concept in B&H organizations. Conference
Proceedings: International Conference of the Faculty of Economics Sarajevo
(ICES), 448-459. http://dx.doi.org/10.1007/s11235-011-9573-6
Tysiac, J. (2012). Internal Control, revisited. Journal of Accountancy, 213(3), 24-29.
Retrieved from http://www.journalofaccountancy.com/issues/2012/mar/20114943
.html
158
Verchick, R. R. M., & Hall, A. (2011). Adapting to climate change while planning for
disaster: Footholds, rope lines, and the Iowa floods. Brigham Young University
Law Review, 2011, 2203-2260. Retrieved from
http://digitalcommons.law.byu.edu/cgi/viewcontent.cgi?article=2631&context=la
wreview
Vissak, T. (2010). Recommendations for using the case study method in international
business research. The Qualitative Report, 15, 370-388. Retrieved from
http://www.nova.edu/ssss/QR/QR15-2/vissak.pdf
Warren, C. M. J (2010). The role of public sector asset managers in responding to climate
change: Disaster and business continuity planning. Property Management, 28,
245-256. http://dx.doi.org/10.1108/02637471011065674
Wayman, M. (2013). Curbing outsourcing risks: Internal audit should examine closely
the oversight of the organization’s third-party relationships to enhance effective
governance and decrease risk. Internal Auditor: Journal of the Institute of Internal
Auditors, 70, 41-44. http://dx.doi.org/10.1007/s11235-011-9573-6
Weber, J., & Wasieleski (2013). Corporate ethics and compliance programs: A report,
analysis and critique. Journal of Business Ethics, 112, 609-626. http://dx.doi.org
/1007/s10551-012-1561-6
Wedawatta, G., & Ingirige, B. (2012). Resilience and adaptation of small and medium-
sized enterprises to flood risk. Disaster Prevention and Management, 21, 474-
488. http://dx.doi.org/10.1108/09653561211256170
Wees, A. (2013). Requirements for business contingency and continuity plans
(CSEC650, 9045). , . Retrieved from RESEARCHEDSOLUTION website: https://researchedsolution.wordpress.com/2013/09/14/requirements-for-business-
contingency-and-continuity-plans/
Wines, G. (2012). Auditor independence. Managerial Auditing Journal, 27(1), 5-40.
http://dx.doi.org/10.1108/02686901211186081
Yin, R. K. (2009). Case study research design and methods (4th ed.). Thousand Oaks,
CA: Sage.
Yoon, D. K., Youngs, G. A. Jr., & Abe, D. (2012), Examining factors contributing to the
development of FEMA-approved hazard mitigation plans, Journal of Homeland
Security and Emergency Management, 9(2), 1-18. doi:10.1515/1547-7355.2010
Zaharia, D. L., Dragne, L., & Tilea, D. M. (2014). The modern practice of internal
auditing in the context of gloabilization. Knowledge Horizons Economics, 6, 174-
176. Retrieved from http://www.orizonturi.ucdc.ro/arhiva/2014_khe_62_p ...
6_iss_2_174to176.pdf
159
Zain, M. M., Zaman, M., & Mohamed, Z. (2015). The effect of internal audit function
quality and internal audit contribution to external audit on audit fees.
International Journal of Auditing, 19, 134-147. http://dx.doi.org/10.1111/ijau
.12043
Zaman, M., & Sarens, G. (2013). Informal interactions between audit committees and
internal audit functions. Managerial Auditing Journal, 28(6), 495-515.
http://dx.doi.org/10.1108/02686901311329892
Zerni, M. (2012). Do client firms manage the perception of auditor independence?
Managerial Auditing Journal, 27, 821-845. http://dx.doi.org/10.1108
/02686901211263067
160
Appendices
161
Appendix A: Recruitment Letter - Telephone Script
My name is Monday N. Rufus, and I am a Ph.D. candidate at Northcentral University in
Prescott, Arizona. I am under the supervision of Dr. Edward Kim, Dissertation Chair.
I am recruiting government sector internal auditors to participate in my dissertation
research study. The study explores business continuity planning and the role internal
auditors play in the government sector. The results of this case study are intended to
benefit internal auditors and government sector in helping protect the interests of the
public. To participate, you must currently be an internal auditor working in the State of
Texas. You must also be between 18 and 65 years of age.
Participation will consist of a one-on-one interview in person or on the phone, and will
last between 30–45 minutes. Participation is completely voluntary, and you may stop the
interview at any time. To ensure your protection, names and identities will not be
disclosed to anyone at any time. Prior to the interview, you will be asked to sign an
Informed Consent Form. This form will provide a complete overview of what will be
asked of you. This overview includes how your privacy will be protected, and the uses of
the interview data.
Thank you in advance for your time. If you have any questions, please feel free to
contact me at [email protected] or via phone at 512-775-3698.
This study has received approval from the Northcentral University Institutional Review
Board (IRB #2016).
162
Appendix B: Recruitment Letter - Email Script
As discussed over the phone, my name is Monday N. Rufus, and I am a Ph.D. candidate
at Northcentral University in Prescott, Arizona. I am under the supervision of Dr.
Edward Kim, Dissertation Chair.
I am recruiting government sector internal auditors to participate in my dissertation
research study. The study explores business continuity planning and the role internal
auditors play in the government sector. The results of this case study are intended to
benefit internal auditors and government sector in helping protect the interests of the
public. To participate, you must currently be an internal auditor working in the State of
Texas. You must also be between 18 and 65 years of age.
Participation will consist of a one-on-one interview in person or on the phone, and will
last between 30–45 minutes. Participation is completely voluntary, and you may stop the
interview at any time. To ensure your protection, names and identities will not be
disclosed to anyone at any time. Prior to the interview, you will be asked to sign an
Informed Consent Form. This form will provide a complete overview of what will be
asked of you. This overview includes how your privacy will be protected, and the uses of
the interview data.
Thank you in advance for your time. If you have any questions, please feel free to
contact me at [email protected] or via phone at 512-775-3698.
This study has received approval from the Northcentral University Institutional Review
Board (IRB #2016).
163
Appendix C: IRB Approval
164
Appendix D: Informed Consent Form
Introduction:
My name is Monday N. Rufus. I am a doctoral student at Northcentral University. I
am conducting a research study on the perceived roles of the internal auditor in
business continuity planning in the government sector. I am completing this research
as part of my doctoral degree. I invite you to participate.
Activities:
If you participate in this research, you will be asked to partake in a 30 to 45-minute
interview over the phone or in person.
Eligibility:
You are eligible to participate in this research if you are identified as an internal
auditor currently working in the State of Texas in the United States, and are between
18 and 65 years of age.
You are not eligible to participate in this research if:
1. You are less than 18 years or more than 65 years old
2. You are not working in the government sector as an internal auditor in the
State of Texas.
I hope to include a sample 20 people in this research.
Risks:
There are minimal risks in this study. Some of the questions might be personally
sensitive since they are asking your opinion on the perceived roles of the internal
auditor in business continuity planning in the government sector. Additionally, some
of the interviews may occur in a public setting like a coffee shop or restaurant where
confidentiality will not be guaranteed. This can be uncomfortable for some people.
Alternatively, the interview may occur at a public library where private rooms exist.
You can choose to skip any questions that you feel uncomfortable in answering. You
may also stop participating in the interview at any time.
Benefits:
If you decide to participate, there are no direct benefits to you.
The potential benefits to others are: The results of this case study could be useful to
the government sector and their internal auditors as they continue to protect the
interest of the public.
Confidentiality:
The information you provide will be kept confidential to the extent allowable by law.
Some steps I will take to keep your identity confidential are not to link your name and
your personal information to data collected. The researcher will be the only person
who will see the data.
The people who will have access to your information are my dissertation committee
and me. The Institutional Review Board may also review my research and view your
information.
I will secure your information with these steps: securing it in a fireproof safe with a
key combination only known to me. All electronic forms of data will be encrypted on
my computer and password protected and computer transported in a locked case.
I will keep your data for 7 years. Then, I will delete electronic data and destroy paper
data.
165
Contact Information:
If you have questions for me, you can contact me at [email protected]
My dissertation chair’s name is Dr. Edward Kim. He works at Northcentral
University and is supervising me on the research. You can contact him at
[email protected] or on his office phone at 303-282-7448. If you have questions about your rights in the research, or if a problem has occurred,
or if you are injured during your participation, please contact the Institutional Review
Board at [email protected] or 1-888-327-2877 ext 8014.
Voluntary Participation:
Your participation is voluntary. If you decide not to participate, or if you stop
participation after you start, there will be no penalty to you. You will not lose any
benefit to which you are otherwise entitled.
Audiotaping:
I would like to use a voice recorder to record your responses. You can still
participate if you do not wish to be recorded. If so, I will ask you to verify my notes
after the interview in person or via a telephone.
Please sign here if I can record you:
Signature:
A signature indicates your understanding of this consent form. You will be given a
copy of the form for your information.
Participant SignaturePrinted NameDate
Researcher SignaturePrinted NameDate
166
Appendix E: Interview Guide
I will follow the protocol below:
1. Identify potential participants.
2. Select individuals to be interviewed.
3. Email a Recruiting Letter to the individuals to the individuals to be interviewed.
Explain the purpose of the study.
4. Set interviews with the participants and explain the purpose of the interview, why
each individual was selected. Also, explain how long the interview will last.
5. Seek informed consent of the interviewee prior to beginning the interview.
Reiterate the purpose of the study and interview, why the interviewee was
selected, how long the interview will last, confidentiality, and tape recording.
6. After obtaining consent, I will conduct the interview using the questionnaire
instrument developed. Interview questions will be open-ended
7. After the interview, I will obtain verification of notes, if the interviewee elected
not to be tape recorded.
167
Appendix F: Interview Questions
1. What are the perceived reasons why an organization such as a government agency
should prepare for a disruption before it occurs?
2. What are the perceived elements or lack of elements that get in the way of dealing
with disruptions successfully?
3. What are the perceived reasons for the internal auditor’s participation in the
development and implementation of business continuity planning?
4. What are the perceived reasons for not involving the internal auditor in business
continuity planning?
5. Overall, how could government agencies mitigate the impact of a disaster without
the input of the internal auditor?
6. What can mitigate the impact of the service disruptions other than the use of
business continuity planning?
7. What are the roles of the internal auditor in enterprise risk management within the
government sector?
8. How does enterprise risk management relate or defer from business continuity
planning?
9. What steps considered in the development and implementation of business
continuity planning? Can any of the steps be completed without the input of the
internal auditor?
10. How should the internal auditor be involved in business continuity planning
within in the government sector?
168
11. If the internal should be involved in business continuity planning, what are the
areas they could be excluded (e.g., business impact analysis, security risk
assessment, recovery strategy, disaster recovery plan, update/maintenance) and
why?
12. How should the internal auditor be involved in business continuity planning in the
government sector?
13. What could be the reaction of those charged with governance regarding internal
auditor’s roles in business continuity planning?
14. If the internal auditor participates in the business continuity planning, what are the
necessary safeguards to mitigate the impairment of independence?
15. If the internal auditor does not participate in business continuity planning, what
are risks to the government sector, if any?