Project-4
Phone Manufacturing
Project requirements
· Aluminium of alloys
· The phone case often consists of lightweight materials
• Cobalt oxide in lithium
· • Graphite made of carbon
· Gold
· Copper
· Silver
Metal oxides, carbon-based compounds, and numerous other elements are among them. In order to create a mobile phone from its component parts and materials, raw materials must be extracted from the ground and processed. Aluminum alloys are often used to construct a smartphone's housing because of their low weight and high strength. A combination of lithium cobalt oxide and carbon graphite is used in the manufacturing process of the batteries. There is a possibility that the wiring of the phone contains gold, copper, and silver.
Budget Plan
Phone Manufacturing Transaction Risk Plan
|
Expected Risk |
Some Reason |
Response to Risk |
Protection for the Issue |
Security hazards
|
Terrorism |
By putting in place the necessary checks and balances for monitoring |
Provide Security Measures |
Operational
|
A failure to properly execute core processes and vital tasks, such as production or procurement. |
Requesting feedback from each member of the team or staff |
Having conversations with prominent members of the industry or critical stakeholders |
Health and safety
|
Compromise the compliance norms of an organization. |
Safety and health policies should be evaluated and monitored frequently to identify risks that could cost a company money in fines or other penalties. |
The onus of permanently monitoring health and safety risks in the workplace and in the company's products and services |
Performance
|
It is quite unlikely that the outcomes will be as desired. |
Using KPIs in risk management |
Create a strategy for reducing risks to protect yourself from potential hazards. |
Change Management Process
The client is required to submit their permission on the design of the modification before the site engineer can send the drawing to the person in charge of the project. If there is going to be any sort of change made to the project, the customer must provide their approval on the design first. After having a conversation about the project with the owner and the project manager, the total cost of any adjustments that need to be made to the project will be added to the list of entity items. This will take place after the discussion. Each and every item list will be presented to the customer for their review and authorization prior to being sent on to the project manager for the purpose of receiving final confirmation. After receiving consent from the client, the Site engineer will make any necessary modifications to the system.
Stakeholder engagement and communication plan
Phone Manufacturing Team Manager
Services
Site Operating System Engineer
Design Prototype Engineer
A Systems Engineer's primary responsibility is to analyse a system and locate any problems that may exist inside it. When issues develop, they give solutions, which may include the designing of systems, the updating of hardware, or normal maintenance.
|
Earned Value Analysis Report
|
|
References
Jin, J., & Von Zedtwitz, M. (2008). Technological capability development in China's mobile phone industry. Technovation, 28(6), 327-334.
Page, T. (2015). AN APPROACH TO THE MANAGEMENT OF THE SUSTAINABLE ISSUES IN MOBILE PHONE DESIGN AND MANUFACTURING. Journal on Management, 10(2).
CostsProject manager Design Engineer Drafts man Site Engineer 3 1 0.5 1
Planned Value (PV) 1 2 3 4 5 6 7 8 9 10 11 12 1000 1800 4400 7500 11400 13900 14600 15500 17000 17700 19100 19900 Earned Value (EV) 1 2 3 4 5 6 7 8 9 10 11 12 90 600 2660 4040 6300 13485 15565 Actual Cost (AC) 1 2 3 4 5 6 7 8 9 10 11 12 800 1950 4550 6550 10800 13600 14500