Executing the project

profileAldo061991
OriginalityReport.pdf

6/26/2020 Originality Report

https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReport/ultra?attemptId=b20d3390-cc1b-43f2-abf8-1259f8cafbc1… 1/5

%98

%2

SafeAssign Originality Report Summer 2020 - Executing the Project (BADM-635-01) - First Bi-Term • Activity 5

%100Total Score: High riskSusainathan Rinaldo Joseph Submission UUID: 6e532888-8b2d-1209-d356-26dc999276dd

Total Number of Reports

1 Highest Match

100 % Activity 5.docx

Average Match

100 % Submitted on

06/26/20 12:53 AM EDT

Average Word Count

392 Highest: Activity 5.docx

%100Attachment 1

Institutional database (7)

Student paper Student paper Student paper

Student paper Student paper Student paper

Student paper

Internet (2)

brainmass bartleby

Top sources (3)

Excluded sources (0)

View Originality Report - Old Design

Word Count: 392 Activity 5.docx

3 1 2

8 4 7

5

6 9

3 Student paper 1 Student paper 2 Student paper

Running Head: EXECUTING PROJECT – ACTIVITY 5

EXECUTING PROJECT 2

EXECUTING PROJECT Activity 5

Rinaldo Joseph

University of Cumberland’s

Activity 5

Activity I - Your university is holding a fund-raiser and will be hiring a band to entertain spectators. You have been selected to serve as the event project manager

and have created a Work Breakdown Structure and duration estimates for the activities involved in site preparation for the event. Construct a network activity diagram based on the following information: Activity Description Predecessors Duration (Days)

A Site selection None 4

B Buy concessions A 4

C Rent facilities A 2

D Build stands A 5

E Generator & wiring installation C 2

F Security B 4

G Lighting installation E 2

1

2

3

1

6/26/2020 Originality Report

https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReport/ultra?attemptId=b20d3390-cc1b-43f2-abf8-1259f8cafbc1… 2/5

Source Matches (25)

Student paper 67% Student paper 67%

g g

H Sound system installation E, F 2

I Stage construction D 3

J Tear down G, H, I 4

1. Conduct both a forward and backward pass using AON notation. What is the estimated total duration for the project? 64 days

2. Identify all paths through the network. AB, AC, CB, BE, EF, DF, GH, HI Which is the critical path? AC

3. Which activities have slack time? D, G, H, I

4. Identify all burst activities A, E and merge activities (E, F), (G, H, I)

Network Activity Diagram

F H A 4

A A 2 5 3 4

A - B C D I J 4 2 2 E G

Activity II - Given the following information, answer the questions about this project: Activity Expected Duration Predecessors

A 4 days —

B 9 days A

C 11 days A

D 5 days B

E 3 days B

F 7 days C

G 3 days D, F

H 2 days E, G

I 1 day H

1. Draw the network as a Gantt chart. 2. What is the critical path? 11 days at activity C Which activities have slack time? A, C, E 3. What would

happen if activities B and D each took 5 extra days to complete instead of the expected duration? How would the critical path change? The critical path will change and shift to 13 days which will actually lead to prolonged activity B i.e. 9+5 which gives 13 days as the critical path.

References

Pinto, J.K. (2019). Project Management: Achieving Competitive Advantage (5thed). Boston: Pearson. Chapter 9 & 10. Retrieved from

https://doi.org/10.1002/9781119559078.ch10

3

3

3

3

4

5

6

7

3 1

3 3 8 9 3

3 3

1

Student paper

EXECUTING PROJECT – ACTIVITY 5 EXECUTING PROJECT 2 EXECUTING PROJECT Activity 5

Original source

Executing the Project Executing the Project Executing the Project

2

Student paper

University of Cumberland’s

Original source

Project Management, University of the Cumberland’s

6/26/2020 Originality Report

https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReport/ultra?attemptId=b20d3390-cc1b-43f2-abf8-1259f8cafbc1… 3/5

Student paper 100%

Student paper 100%

Student paper 100%

Student paper 100%

Student paper 100%

Student paper 100%

Student paper 91%

Student paper 69%

Student paper 100%

Student paper 67%

3

Student paper

Activity I - Your university is holding a fund-raiser and will be hiring a band to entertain spectators. You have been selected to serve as the event project manager and have created a Work Breakdown Structure and duration estimates for the activities involved in site preparation for the event. Construct a network activity diagram based on the following information:

Original source

Activity I Your university is holding a fund-raiser and will be hiring a band to entertain spectators You have been selected to serve as the event project manager and have created a Work Breakdown Structure and duration estimates for the activities involved in site preparation for the event Construct a network activity diagram based on the following information

1

Student paper

Activity Description Predecessors Duration (Days) A Site selection None 4 B Buy concessions A 4 C Rent facilities A 2

Original source

Activity Description Predecessors Duration (Days) A Site selection None 4 B Buy concessions A 4 C Rent facilities A 2

1

Student paper

D Build stands A 5 E Generator & wiring installation C 2 F Security B 4 G Lighting installation E 2

Original source

D Build stands A 5 E Generator & wiring installation C 2 F Security B 4 G Lighting installation E 2

1

Student paper

H Sound system installation E, F 2 I Stage construction D 3 J Tear down G, H, I 4

Original source

H Sound system installation E, F 2 I Stage construction D 3 J Tear down G, H, I 4

3

Student paper

Conduct both a forward and backward pass using AON notation. What is the estimated total duration for the project?

Original source

Conduct both a forward and backward pass using AON notation What is the estimated total duration for the project

3

Student paper

Identify all paths through the network.

Original source

Identify all paths through the network

3

Student paper

Which activities have slack time? D, G, H, I

Original source

Which activities have slack time A-B-D-G- H-I

3

Student paper

Identify all burst activities A, E and merge activities (E, F), (G, H, I)

Original source

Identify all burst activities and merge activities

4

Student paper

Network Activity Diagram

Original source

Network Activity Diagram

5

Student paper

F H A 4

Original source

H and J A 4

6/26/2020 Originality Report

https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReport/ultra?attemptId=b20d3390-cc1b-43f2-abf8-1259f8cafbc1… 4/5

brainmass 70%

Student paper 65%

Student paper 100%

Student paper 100%

Student paper 100%

Student paper 100%

Student paper 100%

Student paper 100%

Student paper 65%

bartleby 81%

Student paper 100%

6

Student paper

A A 2 5 3 4

Original source

4 Mass storage requirements 5 2, 3

7

Student paper

A - B C D I J 4 2 2 E G

Original source

A-C-E-G-J = 4+2+2+2+4 = 14

3

Student paper

Activity II - Given the following information, answer the questions about this project:

Original source

Activity II - Given the following information, answer the questions about this project

1

Student paper

Activity Expected Duration Predecessors A 4 days — B 9 days A C 11 days A

Original source

Activity Expected Duration Predecessors A 4 days — B 9 days A C 11 days A

1

Student paper

D 5 days B E 3 days B F 7 days C G 3 days D, F

Original source

D 5 days B E 3 days B F 7 days C G 3 days D, F

1

Student paper

H 2 days E, G I 1 day H

Original source

H 2 days E, G I 1 day H

3

Student paper

Draw the network as a Gantt chart.

Original source

Draw the network as a Gantt chart

3

Student paper

What is the critical path?

Original source

What is the critical path

8

Student paper

11 days at activity C Which activities have slack time?

Original source

Activity C will have 6 days of slack time

9

Student paper

A, C, E 3.

Original source

E 3 Days C

3

Student paper

What would happen if activities B and D each took 5 extra days to complete instead of the expected duration? How would the critical path change?

Original source

What would happen if activities B and D each took 5 extra days to complete instead of the expected duration How would the critical path change

6/26/2020 Originality Report

https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReport/ultra?attemptId=b20d3390-cc1b-43f2-abf8-1259f8cafbc1… 5/5

Student paper 100%

Student paper 100%

3

Student paper

Pinto, J.K.

Original source

Pinto, J.K

3

Student paper

Achieving Competitive Advantage (5thed).

Original source

Achieving Competitive Advantage (5thed)