Business Requirements Document Part 4 - Test Cases

profilefeoeigw2g3
order_65483_1572651.doc

Running head: CASE AND STORYBOARDS 1

CASE AND STORYBOARDS 8

Case and Story Boards

Student’s Name

Institution

Cases and Storyboards

Uml case 1 for a construction business

The marketing and Advertising process

The above case shows the current process for the processes for an affordable quality construction site. In the case. There is the representation of how the businesses advertises in the local newspapers and even in church bulletins. The way the business is generated from the word of mouth and advertised to various customers is also shown. With the mention of the prospective customers getting to the job sites, the case also shows that as it demonstrates on its own box(Gomaa,2005). There is also the mention of how prospective customers can get information from neighbouring houses.

2.Uml case for job process

3.Case and Story Boards

Uml use case for Fluctuation on job Availability and Job Type and the emergencies

The above uml use case demonstrates the fluctuation on the availability of the job and the job type. What is demonstrated gives the lucrative seasons which are; summer, fall and spring. It also shows the more jobs that are lucrative and which are shown outside and how they are less time consuming. The uml case clearly shows how the outside jobs cannot be undertaken during the winter season. The case also puts into good use the emergencies that may occur. The emergencies may be due to new and even previous customers, the way emergency jobs bring forth additional value and other things is also highlighted(Gomaa,2005).

Uml case 4

The above uml use case puts into consideration the way gets to continue when a contractor gets down to work. When it is discovered that there is more work, it has to be agreed upon so that it can get conducted in the best ways possible by a contractor(Newman,2001).

Uml use case

The above uml use case shows and indicates the instances in which repair works are conducted. Repairs arise because of majority of things. One of the reasons may be due to defective materials, when workmanship is of substandard among other things. All those factors when put into consideration will make work to get redone(Gomaa,2005).

Story Boards

The above storyboards have been put on one stot board to be 3. They represent the workforce concerns, material concerns and compliance structure. In the story boards, what is clear is that all processes in the 3 story boards should be followed to the last point with the aim of having success and getting to reach the point that the work is done, on issues that need to be checked, it will definitely demand for permits to be given and for work to be undertaken. (Newman,2001)

References

Gomaa, H. (2005). Designing software product lines with UML: from use cases to pattern-

based software architectures. Boston: Addison-Wesley.

Newman, L. (2001). Proposal guide for business development professionals. Farmington,

UT: Shipley Associates.

Newspapers,

notebook

Word of mouth

Job site

Construction business

Previous customer

Active job sites

Other customers

Neighbouring houses

cement

Roof

Tuck pointing

Decks

Workers taken off

Additional revenue

New customers

Seasons

Less time

Outside jobs

Less lucrative

When a contractor starts the work, there may be cases for additional work and which has to be done.

Work Concerns

When a customer agrees the work gets to continue

A worker is sent

Defective materials

Own payment

Unreplaceable

Customer calls

Workforce Concerns

Team of workers for skilled labour.

Appropriate team to be chosen.

Timing crucial in the business

Workers called in sick times.

Material concerns

Materials purchased and delivered in time.

Amount, type, quality of materials researched.

Optimal situation is for customer purchase.

Other building materials purchased and paid for.

Compliance

Permits approved and paid for.

City, state and federal codes determined

E