Scope Management Plan (SMP)
Industry: Industrial Machinery for the Oil & Gas and Power Generation Markets
Services Provided: Project Management, Project Scheduling, Vendor Management
Company: A provider of highly efficient turbine-driven gas compression, oil pumping and power generation packages for onshore and offshore applications worldwide
Challenge: With increasing logistics and labor costs threatening to seriously impact profit margins, the company’s supply chain sectors in North America saw a need for
improved material management to meet rising demands for order accuracy while increasing
productivity and reducing costs. The major challenges they faced were overhead control
issues such as inaccurate inventory counts, shipping errors, receiving errors, and a need to
improve delivery speeds.
Analysis concluded that improvements would best be achieved by substituting technology
for potentially error-prone human activities such as receiving, putaway, picking, shipping and
inventory counting. Providing an automated means for data to be conveyed directly from the
warehouse floor into SAP’s Supply Chain Management (SCM) software rather than via a manual counting and recording process
would improve accuracy, reduce overhead costs, and provide real-time supply chain visibility.
Solution: The organization decided to take advantage of radio frequency (RF) automation and SAP integration within the warehouse to achieve optimum supply chain efficiency and productivity. Midway through the project, it became apparent to the
company that they did not have the appropriate level of project management capacity available in-house. They called upon PM
Solutions to provide a senior-level project manager to lead the “North America Program Team” in the implementation of a warehouse
RF solution for the final third of the project duration. PM Solutions’ project manager immediately assumed responsibility for
developing and managing the overall project plan, which consisted of three distinct components:
:: Install shop floor wireless network
:: Build, configure, and connect Radio Frequency devices
:: Incorporate RF-associated SAP changes
PM Solutions’ project manager performed the roles of project manager and system integrator, being responsible for overseeing
requirements gathering, systems design, procurement and installation of the necessary hardware and software, and coordinating
user acceptance testing.
VA L U E D E L I V E R E D
Thanks to a retooling of the
materials management system
incorporating radio frequency
(RF) automation, the company’s
warehouse accelerated delivery
speed of parts by 66%,
creating a significant reduction
in overall time-to-market. This
complex automation project
came in on time and more than
18% under budget.
$
The new RF solution was delivered on schedule and more
than 18% under budget. The biggest gains from this
implementation were improved inventory accuracy and
increased productivity. The expected delivery speed of
parts from the warehouse was reduced by 66% (from
24 hours to 8 hours), producing a significant improvement
in overall time-to-market. This successful project laid the
groundwork for subsequent operational improvement
initiatives now underway at the client’s locations in the US
and Europe.
pmsolutions.com :: 800.983.0388 :: PMO Services :: Program & Project Managers :: PM Training & Development
client successes
results
Wireless Warehouse Initiative Transforms Materials Management Operations and Improves Delivery Speed by 66%
C S
1 0
4 -0
2