Operation Management quiz

profileGeoge
Operations_Management_12th_Edition_2015.pdf

Operations Management

ste24102_fm_i-xxxv.indd iste24102_fm_i-xxxv.indd i 11/29/13 12:51 AM11/29/13 12:51 AM

Final PDF to printer

This page intentionally left blank

William J. Stevenson Saunders College of Business

Rochester Institute of Technology

Operations Management Twelfth Edition

ste24102_fm_i-xxxv.indd iiiste24102_fm_i-xxxv.indd iii 11/29/13 12:51 AM11/29/13 12:51 AM

Final PDF to printer

www.mhhe.com

This book is dedicated to you.

OPERATIONS MANAGEMENT, TWELFTH EDITION

Published by McGraw-Hill Education, 2 Penn Plaza, New York, NY 10121. Copyright © 2015 by McGraw-Hill Education. All rights reserved. Printed in the United States of America. Previous editions © 2012, 2009, and 2007. No part of this publication may be reproduced or distributed in any form or by any means, or stored in a database or retrieval system, without the prior written consent of McGraw-Hill Education including, but not limited to, in any network or other electronic storage or transmission, or broadcast for distance learning.

Some ancillaries, including electronic and print components, may not be available to customers outside the United States.

This book is printed on acid-free paper.

1 2 3 4 5 6 7 8 9 0 DOW/DOW 1 0 9 8 7 6 5 4

ISBN 978-0-07-802410-8 MHID 0-07-802410-2

Senior Vice President, Products & Markets: Kurt L. Strand Vice President, Content Production & Technology Services: Kimberly Meriwether David Managing Director: Douglas Reiner Senior Brand Manager: Thomas Hayward Executive Director of Development: Ann Torbert Senior Development Editor: Wanda J. Zeman Director of Digital Content: Doug Ruby Digital Development Editor: Kevin Shanahan, Meg Maloney Senior Marketing Manager: Heather A. Kazakoff Director, Content Production: Terri Schiesl Content Project Manager: Kristin Bradley Content Project Manager: Rachel Townsend Buyer II: Debra R. Sylvester Design: Srdjan Savanovic Cover Image: Airlines image: © Bloomberg via Getty Images; Apple store image: © FP/Getty Images; Surgeons: © Michie Turpin/Piedmont Healthcare; Workplace image: © Jeff Gilbert/Alamy Lead Content Licensing Specialist: Keri Johnson Typeface: 10/12 Times New Roman Compositor: Laserwords Private Limited Printer: R. R. Donnelley

All credits appearing on page or at the end of the book are considered to be an extension of the copyright page.

The Internet addresses listed in the text were accurate at the time of publication. The inclusion of a website does not indicate an endorsement by the authors or McGraw-Hill Education, and McGraw-Hill Education does not guarantee the accuracy of the information presented at these sites.

ste24102_fm_i-xxxv.indd ivste24102_fm_i-xxxv.indd iv 12/6/13 12:42 PM12/6/13 12:42 PM

Final PDF to printer

The McGraw-Hill Series in Operations and Decision Sciences

Operations Management

Beckman and Rosenfield, Operations, Strategy: Competing in the 21st Century, First Edition

Benton, Purchasing and Supply Chain Management, Second Edition

Bowersox, Closs, Cooper, and Bowersox, Supply Chain Logistics Management, Fourth Edition

Brown and Hyer, Managing Projects: A Team-Based Approach, First Edition

Burt, Petcavage, and Pinkerton, Supply Management, Eighth Edition

Cachon and Terwiesch, Matching Supply with Demand: An Introduction to Operations Management, Third Edition

Cooper and Schindler, Business Research Methods, Twelfth Edition

Finch, Interactive Models for Operations and Supply Chain Management, First Edition

Fitzsimmons, Fitzsimmons, and Bordoloi, Service Management: Operations, Strategy, Information Technology, Eighth Edition

Gehrlein, Operations Management Cases, First Edition

Harrison and Samson, Technology Management, First Edition

Hayen, SAP R/3 Enterprise Software: An Introduction, First Edition

Hill, Manufacturing Strategy: Text & Cases, Third Edition

Hopp, Supply Chain Science, First Edition

Jacobs, Berry, Whybark, and Vollmann, Manufacturing Planning & Control for Supply Chain Management, Sixth Edition

Jacobs and Chase, Operations and Supply Management: The Core, Third Edition

Jacobs and Chase, Operations and Supply Management, Fourteenth Edition

Jacobs and Whybark, Why ERP? First Edition

Larson and Gray, Project Management: The Managerial Process, Sixth Edition

Leenders, Johnson, and Flynn, Purchasing and Supply Management, Fourteenth Edition

Olson, Introduction to Information Systems Project Management, Second Edition

Schroeder, Goldstein, Rungtusanatham, Operations Management: Contemporary Concepts and Cases, Sixth Edition

Seppanen, Kumar, and Chandra, Process Analysis and Improvement, First Edition

Simchi-Levi, Kaminsky, and Simchi-Levi, Designing and Managing the Supply

Chain: Concepts, Strategies, Case Studies, Third Edition

Sterman, Business Dynamics: Systems Thinking and Modeling for Complex World, First Edition

Stevenson, Operations Management, Twelfth Edition

Swink, Melnyk, Cooper, and Hartley, Managing Operations Across the Supply Chain, Second Edition

Thomke, Managing Product and Service Development: Text and Cases, First Edition

Ulrich and Eppinger, Product Design and Development, Fourth Edition

Zipkin, Foundations of Inventory Management, First Edition

Quantitative Methods and Management Science

Hillier and Hillier, Introduction to Management Science: A Modeling and Case Studies Approach with Spreadsheets, Fifth Edition

Stevenson and Ozgur, Introduction to Management Science with Spreadsheets, First Edition

ste24102_fm_i-xxxv.indd vste24102_fm_i-xxxv.indd v 11/29/13 12:51 AM11/29/13 12:51 AM

Final PDF to printer

This page intentionally left blank

vii

• New material and more emphasis have been devoted to these topics:

Service Supply chain management Sustainability Step-by-step problem solving

• Throughout the text, there are new, updated readings, and photos to provide students with a motivating view of the critical importance of operations management today.

• Connect Plus for Operations Management is now available with LearnSmart, McGraw-Hill’s adaptive learning component. LearnSmart provides assignable modules that help students master core concepts and come to class better prepared.

Acknowledgments I want to thank the many contributors to this edition. Review- ers and adopters of the text have provided a “continuously improving” wealth of ideas and suggestions. It is encourag- ing to me as an author. I hope all reviewers and readers will know their suggestions were valuable, were carefully consid- ered, and are sincerely appreciated. The list includes post- publication reviewers.

Robert Aboolian, California State University— San Marcos

Pamela Barnes, Kansas State University

Greg Bier, University of Missouri

Gary Black, University of Southern Indiana

Jeff Brand, Marquette University

Cenk Caliskan, Utah Valley University

Cem Canel, University of North Carolina—Wilmington

Jen-Yi Chen, Cleveland State University

Robert Clark, Stony Brook University

Dinesh Dave, Appalachian State University

Abdelghani Elimam, San Francisco State

Kurt Engemann, Iona College

Michael Fathi, Georgia Southwestern State

Warren Fisher, Stephen F. Austin State University

Gene Fliedner, Oakland University

Theodore Glickman, George Washington University

Haresh Gurnani, University of Miami

Johnny Ho, Columbus State University

Ron Hoffman, Greenville Technical College

Preface

The material in this book is intended as an introduction to the field of operations management. The topics covered include both strategic issues and practical applications. Among the topics are forecasting, product and service design, capacity planning, management of quality and quality control, inven- tory management, scheduling, supply chain management, and project management.

My purpose in revising this book continues to be to pro- vide a clear presentation of the concepts, tools, and appli- cations of the field of operations management. Operations management is evolving and growing, and I have found updating and integrating new material to be both reward- ing and challenging, particularly due to the plethora of new developments in the field, while facing the practical limits on the length of the book.

This text offers a comprehensive and flexible amount of content that can be selected as appropriate for different courses and formats, including undergraduate, graduate, and executive education.

This allows instructors to select the chapters, or portions of chapters, that are most relevant for their purposes. That flexibility also extends to the choice of relative weighting of the qualitative or quantitative aspects of the material and the order in which chapters are covered because chapters do not depend on sequence. For example, some instructors cover project management early, others cover quality or lean early, etc.

As in previous editions, there are major pedagogical fea- tures designed to help students learn and understand the material. This section describes the key features of the book, the chapter elements, the supplements that are available for teaching the course, highlights of the eleventh edition, and suggested applications for classroom instruction. By pro- viding this support, it is our hope that instructors and stu- dents will have the tools to make this learning experience a rewarding one.

What’s New in This Edition This edition has been revised to incorporate and integrate changes in the field of Operations Management, and the many suggestions for improvement received from instructors around the world who are using the text. The following are key among the revisions:

• New examples, discussion questions, and problems have been incorporated throughout.

• Some content has been rewritten or added to include current information, improve clarity and help understanding.

ste24102_fm_i-xxxv.indd viiste24102_fm_i-xxxv.indd vii 11/29/13 12:51 AM11/29/13 12:51 AM

Final PDF to printer

viii Preface

Lisa Houts, California State University—Fresno

Stella Hua, Western Washington University

Neil Hunt, Suffolk University

Faizul Huq, Ohio University

Richard Jerz, St. Ambrose University

George Kenyon, Lamar University

Casey Kleindienst, California State University—Fullerton

John Kros, East Carolina University

Anita Lee-Post, University of Kentucky

Nancy Levenburg, Grand Valley State University

F. Edward Ziegler, Kent State University

Other contributors include accuracy checkers: Gary Black, University of Southern Indiana, Michael Godfrey, University of Wisconsin at Oshkosh, and Richard White, University of North Texas; Test Bank: Alan Cannon, University of Texas at Arlington; PowerPoints: David Cook, Old Dominion Univer- sity; Data Sets: Mehdi Kaighobadi, Florida Atlantic Univer- sity; Excel Templates and ScreenCam tutorials: Lee Tangedahl, University of Montana; Instructors Manual: Michael Godfrey.

Special thanks goes out to Larry White, Eastern Illinois University, who helped revise, design, and develop interactive content in Connect ® Operations Management for this edition:

Finally I would like to thank all the people at McGraw- Hill/Irwin for their efforts and support. It is always a plea- sure to work with such a professional and competent group of people. Special thanks go to Thomas Hayward, Senior Brand Manager; Wanda Zeman, Senior Development Editor; Kristin Bradley, Project Manager; Debra Sylvester, Buyer; Heather Kazakoff, Senior Marketing Manager; Srdjan Savanovic, Designer; Rachel Townsend, Content Project Manager; Keri Johnson, Senior Photo Research Coordinator, and many others who worked “behind the scenes.”

I would also like to thank the many reviewers of previ- ous editions for their contributions. Vikas Agrawal, Fay- etteville State University; Bahram Alidaee, University of Mississippi; Ardavan Asef-Faziri, California State Uni- versity at Northridge; Prabir Bagchi, George Washington State University; Gordon F. Bagot, California State Uni- versity at Los Angeles; Ravi Behara, Florida Atlantic Uni- versity; Michael Bendixen, Nova Southeastern; Ednilson Bernardes, Georgia Southern University; Prashanth N. Bharadwaj, Indiana University of Pennsylvania; Greg Bier, University of Missouri at Columbia; Joseph Biggs, Cal Poly State University; Kimball Bullington, Middle Ten- nessee State University; Alan Cannon, University of Texas at Arlington; Injazz Chen, Cleveland State University; Alan Chow, University of Southern Alabama at Mobile; Chrwan-Jyh, Oklahoma State University; Chen Chung, University of Kentucky; Robert Clark, Stony Brook Uni- versity; Loretta Cochran, Arkansas Tech University; Lewis Coopersmith, Rider University; Richard Crandall, Appalachian State University; Dinesh Dave, Appalachian

State University; Scott Dellana, East Carolina University; Kathy Dhanda, DePaul University; Xin Ding, University of Utah; Ellen Dumond, California State University at Ful- lerton; Richard Ehrhardt, University of North Carolina at Greensboro; Kurt Engemann, Iona College; Diane Ervin, DeVry University; Farzaneh Fazel, Illinois State Univer- sity; Wanda Fennell, University of Mississippi at Hatties- burg; Joy Field, Boston College; Warren Fisher, Stephen F. Austin State University; Lillian Fok, University of New Orleans; Charles Foley, Columbus State Community Col- lege; Matthew W. Ford, Northern Kentucky University; Phillip C. Fry, Boise State University; Charles A. Gates Jr., Aurora University; Tom Gattiker, Boise State University; Damodar Golhar, Western Michigan University; Robert Graham, Jacksonville State University; Angappa Gunas- ekaran, University of Massachusetts at Dartmouth; Haresh Gurnani, University of Miami; Terry Harrison, Penn State University; Vishwanath Hegde, California State Univer- sity at East Bay; Craig Hill, Georgia State University; Jim Ho, University of Illinois at Chicago; Seong Hyun Nam, University of North Dakota; Jonatan Jelen, Mercy Col- lege; Prafulla Joglekar, LaSalle University; Vijay Kannan, Utah State University; Sunder Kekre, Carnegie-Mellon University; Jim Keyes, University of Wisconsin at Stout; Seung-Lae Kim, Drexel University; Beate Klingenberg, Marist College; John Kros, East Carolina University; Vinod Lall, Minnesota State University at Moorhead; Ken- neth Lawrence, New Jersey Institute of Technology; Jooh Lee, Rowan University; Anita Lee-Post, University of Kentucky; Karen Lewis, University of Mississippi; Bing- guang Li, Albany State University; Cheng Li, California State University at Los Angeles; Maureen P. Lojo, Califor- nia State University at Sacramento; F. Victor Lu, St. John’s University; Janet Lyons, Utah State University; James Maddox, Friends University; Gita Mathur, San Jose State University; Mark McComb, Mississippi College; George Mechling, Western Carolina University; Scott Metlen, Uni- versity of Idaho; Douglas Micklich, Illinois State Univer- sity; Ajay Mishra, SUNY at Binghamton; Scott S. Morris, Southern Nazarene University; Philip F. Musa, University of Alabama at Birmingham; Roy Nersesian, Monmouth University; Jeffrey Ohlmann, University of Iowa at Iowa City; John Olson, University of St. Thomas; Ozgur Ozluk, San Francisco State University; Kenneth Paetsch, Cleve- land State University; Taeho Park, San Jose State Univer- sity; Allison Pearson, Mississippi State University; Patrick Penfield, Syracuse University; Steve Peng, California State University at Hayward; Richard Peschke, Minne- sota State University at Moorhead; Andru Peters, San Jose State University; Charles Phillips, Mississippi State Uni- versity; Frank Pianki, Anderson University; Sharma Pil- lutla, Towson University; Zinovy Radovilsky, California State University at Hayward; Stephen A. Raper, Univer- sity of Missouri at Rolla; Pedro Reyes, Baylor University; Buddhadev Roychoudhury, Minnesota State University

ste24102_fm_i-xxxv.indd viiiste24102_fm_i-xxxv.indd viii 11/29/13 12:51 AM11/29/13 12:51 AM

Final PDF to printer

Preface ix

at Mankato; Narendra Rustagi, Howard University; Herb Schiller, Stony Brook University; Dean T. Scott, DeVry University; Scott J. Seipel, Middle Tennessee State Uni- versity; Raj Selladurai, Indiana University; Kaushic Sen- gupta, Hofstra University; Kenneth Shaw, Oregon State University; Dooyoung Shin, Minnesota State University at Mankato; Michael Shurden, Lander University; Raymond E. Simko, Myers University; John Simon, Governors State University; Jake Simons, Georgia Southern University; Charles Smith, Virginia Commonwealth University; Ken- neth Solheim, DeVry University; Young Son, Bernard M. Baruch College; Victor Sower, Sam Houston State Uni- versity; Jeremy Stafford, University of North Alabama; Donna Stewart, University of Wisconsin at Stout; Dothang Truong, Fayetteville State University; Mike Umble, Baylor University; Javad Varzandeh, California State University

at San Bernardino; Timothy Vaughan, University of Wis- consin at Eau Claire; Emre Veral, Baruch College; Mark Vroblefski, University of Arizona; Gustavo Vulcano, New York University; Walter Wallace, Georgia State University; James Walters, Ball State University; John Wang, Mont- clair State University; Tekle Wanorie, Northwest Missouri State University; Jerry Wei, University of Notre Dame; Michael Whittenberg, University of Texas; Geoff Wil- lis, University of Central Oklahoma; Pamela Zelbst, Sam Houston State University; Jiawei Zhang, NYU; Zhenying Zhao, University of Maryland; Yong-Pin Zhou, University of Washington.

William J. Stevenson

ste24102_fm_i-xxxv.indd ixste24102_fm_i-xxxv.indd ix 11/29/13 12:51 AM11/29/13 12:51 AM

Final PDF to printer

x

MAJOR STUDY AND LEARNING FEATURES

A number of key features in this text have been specifically designed to help introductory students learn, understand, and apply Operations concepts and problem-solving techniques.

Walkthrough

Sales of new houses and three-month lagged unemployment are shown in the following table. Determine if unemployment levels can be used to predict demand for new houses and, if so, derive a predictive equation.

Period ................................ 1 2 3 4 5 6 7 8 9 10 11

Units sold .......................... 20 41 17 35 25 31 38 50 15 19 14

Unemployment % (three-month lag) ..... 7.2 4.0 7.3 5.5 6.8 6.0 5.4 3.6 8.4 7.0 9.0

E X A M P L E 1 0 e celx

mhhe.com/stevenson12e

S O L U T I O N 1. Plot the data to see if a linear model seems reasonable. In this case, a linear model seems appropriate for the range of the data.

50

40

30

20

10

0 2 4 6 8 10

Level of unemployment (%), x

U n

it s

so ld

, y

2. Check the correlation coefficient to confirm that it is not close to zero using the Web site template, and then obtain the regression equation:

.966r � �

This is a fairly high negative correlation. The regression equation is

71.85 6.91y x� �

Note that the equation pertains only to unemployment levels in the range 3.6 to 9.0, because sample observations covered only that range.

ste24102_ch03_074-133.indd 105 11/10/13 5:10 PM

Examples with Solutions Throughout the text, wherever a quantitative or analytic technique is introduced, an example is included to illustrate the application of that tech- nique. These are designed to be easy to follow.

ste24102_fm_i-xxxv.indd xste24102_fm_i-xxxv.indd x 11/29/13 12:51 AM11/29/13 12:51 AM

Final PDF to printer

SOLVED PROBLEMS

The tasks shown in the following precedence diagram are to be assigned to workstations with the intent of minimizing idle time. Management has designed an output rate of 275 units per day. Assume 440 minutes are available per day.

a. Determine the appropriate cycle time.

b. What is the minimum number of stations possible?

c. Assign tasks using the “positional weight” rule: Assign tasks with highest following times (including a task’s own time) first. Break ties using greatest number of following tasks.

d. Compute efficiency.

Problem 1

a c e

b d f

g h i

0.3 minute 0.2 minute 0.1 minute 0.5 minute 0.3 minute0.4 minute

0.6 minute 0.6 minute1.2 minutes

a. Cycle time Operating time

Desired output

440 minutes per day

275 units per day 1.6 minutes� � � Solution per unit

ste24102_ch06_236-287.indd 276 11/1/13 12:22 PM

xi

Solved Problems At the end of chapters and chapter supplements, “solved problems” are provided to illustrate problem solving and the core concepts in the chapter. These have been carefully prepared to help students understand the steps involved in solving different types of problems. The Excel logo indicates that a spreadsheet is available on the text’s Web site, to help solve the problem.

TABLE 16.5 Excel solution for Example 2a

ste24102_ch16_688-729.indd 703 11/20/13 9:12 AM

Excel Spreadsheet Solutions Where applicable, the examples and solved prob- lems include screen shots of a spreadsheet solution. Many of these were taken from the Excel templates, which are on the text’s website. Templates are programmed to be fully functional in Excel 2013 and earlier.

ste24102_fm_i-xxxv.indd xiste24102_fm_i-xxxv.indd xi 11/29/13 12:51 AM11/29/13 12:51 AM

Final PDF to printer

xii

C H A P T E R

4 CHAPTER OUTLINE

4.1 Introduction, 136 What Does Product and Service Design Do?  136

Key Questions, 136

Reasons for Product or Service Design or Redesign, 137

4.2 Idea Generation, 139

4.3 Legal and Ethical Considerations, 141

4.4 Human Factors, 142

4.5 Cultural Factors, 143

4.6 Global Product and Service Design, 143

4.7 Environmental Factors: Sustainability, 144 Cradle-to-Grave Assessment, 144

End-of-Life Programs, 144

The Three Rs: Reduce, Reuse, Recycle, 144

Reduce: Value Analysis, 145

Reuse: Remanufacturing, 145

Recycle, 146

4.8 Other Design Considerations 149 Strategies for Product or Service Life Stages,  149

Degree of Standardization, 151

Designing for Mass Customization, 151

Reliability, 153

Robust Design, 154

Degree of Newness, 155

Quality Function Deployment, 155

The Kano Model, 158

4.9 Phases in Product Design and Development, 159

4.10 Designing for Production, 160 Concurrent Engineering, 160

Computer-Aided Design, 160

Production Requirements, 161

Component Commonality, 162

4.11 Service Design, 162 Overview of Service Design, 163

Differences between Service Design and Product Design, 163

Phases in the Service Design Process, 164

Service Blueprinting, 164

Characteristics of Well-Designed Service Systems, 165

Challenges of Service Design, 166

Guidelines for Successful Service Design,  166

4.12 Operations Strategy, 167

Operations Tour: High Acres Landfill, 170

Chapter Supplement: Reliability, 171

Product and Service Design

After completing this chapter, you should be able to:

LO4.1 Explain the strategic importance of product and service design.

LO4.2 Describe what product and service design does.

LO4.3 Name the key questions of product and service design.

LO4.4 Identify some reasons for design or redesign.

LO4.5 List some of the main sources of design ideas.

LO4.6 Discuss the importance of legal, ethical, and sustainability considerations in product and service design.

LO4.7 Explain the purpose and goal of life cycle assessment.

LO4.8 Explain the phrase “the 3 Rs.”

LO4.9 Briefly describe the phases in product design and development.

LO4.10 Discuss several key issues in product or service design.

LO4.11 Discuss the two key issues in service design.

LO4.12 List the characteristics of well-designed service systems.

LO4.13 List some guidelines for successful service design.

LEARNING OBJECTIVES

ste24102_ch04_134-170.indd 134 16/10/13 11:48 PM

The essence of a business organization is the products and services it offers, and every aspect of the organization and its supply chain are structured around those products and services. Organizations that have well-designed products or services are more likely to realize their goals than those with poorly designed products or services. Hence, organizations have a stra- tegic interest in product and service design. Product or service design should be closely tied to an organization’s strategy. It is a major factor in cost, quality, time-to-market, customer satisfaction, and competitive advantage. Consequently, marketing, finance, operations, accounting, IT, and HR need to be involved. Demand forecasts and projected costs are important, as is the expected impact on the supply chain. It is significant to note that an important cause of operations failures can be traced to faulty design. Designs that have not been well thought out, or incorrectly implemented, or instructions for assembly or usage that are wrong or unclear, can be the cause of product and service failures, leading to lawsuits, injuries and deaths, product recalls, and damaged reputations.

The introduction of new products or services, or changes to product or service designs, can have impacts throughout the organization and the entire supply chain. Some processes may change very little, while others may have to change consider- ably in terms of what they do or how and when they do it. New processes may have to be added, and some current ones may be eliminated. New suppliers and distributors may need to be found and integrated into the system, and some current suppliers and distributors may no longer be an appropriate fit. Moreover, it is necessary to take into account projected impact on demand as well as financial, marketing, and distribution implications. Because of the potential for widespread effects, taking a “big picture” systems approach early and throughout the design or redesign process is imperative to reduce the chance of missing some implications and costs, and to understand the time it will take. Likewise, input from engineering, operations, marketing, finance, accounting, and supply chains is crucial.

In this chapter you will discover insights into the design process that apply to both product and service design.

LO4.1 Explain the strategic importance of product and service design.

ste24102_ch04_134-170.indd 135 16/10/13 11:48 PM

CHAPTER ELEMENTS

Within each chapter, you will find the following elements that are designed to facilitate study and learning. All of these have been carefully developed over many editions and have proven to be successful.

Chapter Outlines Every chapter and supplement includes an outline of the topics covered.

Learning Objectives Every chapter and supplement lists the learning objectives to achieve when studying the chapter material. The learning objectives are also included next to the specific material in the margins of the text.

Opening Vignettes Each chapter opens with an introduction to the important operations topics covered in the chapter. This enables students to see the relevance of operations management in order to actively engage in learning the material.

ste24102_fm_i-xxxv.indd xiiste24102_fm_i-xxxv.indd xii 11/29/13 12:51 AM11/29/13 12:51 AM

Final PDF to printer

xiii

Figures and Photos The text includes photographs and graphic illustrations to support student learning and provide interest and motivation. Approximately 100 carefully selected photos highlight the twelfth edition. The photos illustrate applications of operations and supply chain concepts in many successful companies. More than 400 graphic illustrations, more than any other text in the field, are included and all are color coded with pedagogical consistency to assist students in understanding concepts.

FIGURE 6.1 Process selection and capacity planning influence system design Forecasting

Product and service design

Technological change

Facilities and equipment

Layout

Work design

Capacity Planning

Process Selection

Inputs Outputs

ste24102_ch06_236-287.indd 238 11/1/13 12:21 PM

A major key to Apple’s continued success is its ability to keep pushing the boundaries of innovation. Apple has demonstrated how to create growth by dreaming up products so new and ingenious that they have upended one industry after another.

ste24102_ch02_040-073.indd 55 11/10/13 4:07 PM

Icons Icons are included in the text, to point out relevant applications in a discussion or concept. These include: Excel icons to point out Excel applications; and ScreenCam Tutorial icons to link to the tutorials on the text’s website.

e celx www.mhhe.com/stevenson11e

e celx mhhe.com/stevenson12e SCREENCAM TUTORIAL

ste24102_fm_i-xxxv.indd xiiiste24102_fm_i-xxxv.indd xiii 11/29/13 12:51 AM11/29/13 12:51 AM

Final PDF to printer

5.12 OPERATIONS STRATEGY The strategic implications of capacity decisions can be enormous, impacting all areas of the organization. From an operations management standpoint, capacity decisions establish a set of conditions within which operations will be required to function. Hence, it is extremely important to include input from operations management people in making capacity decisions.

Flexibility can be a key issue in capacity decisions, although flexibility is not always an option, particularly in capital-intensive industries. However, where possible, flexibility allows an organi- zation to be agile—that is, responsive to changes in the marketplace. Also, it reduces to a certain extent the dependence on long-range forecasts to accurately predict demand. And flexibility makes it easier for organizations to take advantage of technological and other innovations. Maintaining excess capacity (a capacity cushion) may provide a degree of flexibility, albeit at added cost.

Some organizations use a strategy of maintaining a capacity cushion for the purpose of blocking entry into the market by new competitors. The excess capacity enables them to pro- duce at costs lower than what new competitors can. However, such a strategy means higher- than-necessary unit costs, and it makes it more difficult to cut back if demand slows, or to shift to new product or service offerings.

Efficiency improvements and utilization improvements can provide capacity increases. Such improvements can be achieved by streamlining operations and reducing waste. The chapter on lean operations describes ways for achieving those improvements.

Bottleneck management can be a way to increase effective capacity, by scheduling non- bottleneck operations to achieve maximum utilization of bottleneck operations.

In cases where capacity expansion will be undertaken, there are two strategies for deter- mining the timing and degree of capacity expansion. One is the expand-early strategy (i.e., before demand materializes). The intent might be to achieve economies of scale, to expand market share, or to preempt competitors from expanding. The risks of this strategy include an oversupply that would drive prices down, and underutilized equipment that would result in higher unit costs.

The other approach is the wait-and-see strategy (i.e., to expand capacity only after demand materializes, perhaps incrementally). Its advantages include a lower chance of oversupply due to more accurate matching of supply and demand, and higher capacity utilization. The key risks are loss of market share and the inability to meet demand if expansion requires a long lead time.

ste24102_ch05_184-215.indd 207 11/10/13 6:59 PM

gy (i.e., to expand capacity only after demand ges include a lower chance of oversupply due , and higher capacity utilization. The key risks demand if expansion requires a long lead time.

The labels are applied automatically, quite a feat, considering their complexity, size, and the hollow handle they likely encounter during application. MacDonald admits, “Label application was a challenge. We had to modify the bottle several times to accommodate the labeling machinery available.”

Source: “Dutch Boy Brushes Up Its Paints,” Packaging Digest, October 2002. Copyright © 2002 Reed Business Information. Used with permission.

Sherwin-Williams’ Dutch Boy Group has put a revolutionary spin on wall/house painting with its new square-shaped Twist & Pour ™ paint- delivery container for the Dirt Fighter interior latex paint line. The four- piece square container could be the first major change in how house paint is packaged in decades. Lightweight but sturdy, the Twist & Pour “bucket” is packed with so many conveniences, it’s next to impossible to mess up a painting project.

Winning Best of Show in an AmeriStar packaging competition spon- sored by the Institute of Packaging Professionals, the exclusive, all- plastic paint container stands almost 7½ in. tall and holds 126 oz., a bit less than 1 gal. Rust-resistant and moisture-resistant, the plastic bucket gives users a new way to mix, brush, and store paint.

A hollow handle on one side makes it comfortable to pour and [carry]. A convenient, snap-in pour spout neatly pours paint into a tray with no dripping but can be removed if desired, to allow a wide brush to be dipped into the 5¾-in.-dia. mouth. Capping the container is a large, twist-off lid that requires no tools to open or close. Molded with two lugs for a snug-finger-tight closing, the threaded cap provides a tight seal to extend the shelf life of unused paint.

While the lid requires no tools to access, the snap-off carry bail is assembled on the container in a “locked-down position” and can be pulled up after purchase for toting or hanging on a ladder. Large, nearly 4½-in.- tall label panels allow glossy front and back labels printed and UV-coated to wrap around the can’s rounded corners, for an impressive display.

Jim MacDonald, co-designer of the Twist & Pour and a packaging engineer at Cleveland-based Sherwin-Williams, tells Packaging Digest that the space-efficient, square shape is easier to ship and for retail- ers to stack in stores. It can also be nested, courtesy of a recess in the bottom that mates with the lid’s top ring. “The new design allows for one additional shelf facing on an eight-foot rack or shelf area.”

READING Dutch Boy Brushes Up Its Paints

ste24102_ch04_134-170.indd 138 16/10/13 11:48 PM

xiv

Operations Strategies An Operations Strategy section is included at the ends of most chapters. These sections discuss how the chapters’ concepts can be applied and how they impact the operations of a company.

Readings Readings highlight impor- tant real-world applications, provide examples of production/ operations issues, and offer further elaboration of the text material. They also provide a basis for classroom discussion and generate interest in the subject matter. Many of the end-of-chapter readings include assignment questions.

ste24102_fm_i-xxxv.indd xivste24102_fm_i-xxxv.indd xiv 11/29/13 12:51 AM11/29/13 12:51 AM

Final PDF to printer

xv

END-OF-CHAPTER RESOURCES

For student study and review, the following items are provided at the end of each chapter or chapter supplement.

TAKING STOCK This item appears at the end of each chapter. It is intended to focus your attention on three key issues for business organizations in general, and operations management in particular. Those issues are trade-off decisions, collaboration among various functional areas of the organization, and the impact of technol- ogy. You will see three or more questions relating to these issues. Here is the first set of questions:

1. What are trade-offs? Why is careful consideration of trade-offs important in decision making?

2. Why is it important for the various functional areas of a business organization to collaborate?

3. In what general ways does technology have an impact on operations management decision making?

CRITICAL THINKING

EXERCISES

This item also will appear in every chapter. It allows you to critically apply information you learned in the chapter to a practical situation. Here is the first set of exercises:

1. Many organizations offer a combination of goods and services to their customers. As you learned in this chapter, there are some key differences between production of goods and delivery of services. What are the implications of these differences relative to managing operations?

2. Why is it important to match supply and demand? If a manager believes that supply and demand will not be equal, what actions could the manager take to increase the probability of achieving a match?

3. One way that organizations compete is through technological innovation. However, there can be downsides for both the organization and the consumer. Explain.

ste24102_ch01_002-039.indd 37 11/10/13 4:06 PM

1. Demand forecasts are essential inputs for many business decisions; they help managers decide how much supply or capacity will be needed to match expected demand, both within the organization and in the supply chain.

2. Because of random variations in demand, it is likely that the forecast will not be perfect, so managers need to be prepared to deal with forecast errors.

3. Other, nonrandom factors might also be present, so it is necessary to monitor forecast errors to check for nonrandom patterns in forecast errors.

4. It is important to choose a forecasting technique that is cost-effective and one that minimizes forecast error.

KEY POINTS

ste24102_ch03_074-133.indd 115 11/10/13 5:10 PM

1. Determine the utilization and the efficiency for each of these situations: a. A loan processing operation that processes an average of 7 loans per day. The operation has a

design capacity of 10 loans per day and an effective capacity of 8 loans per day. b. A furnace repair team that services an average of four furnaces a day if the design capacity is six

furnaces a day and the effective capacity is five furnaces a day. c. Would you say that systems that have higher efficiency ratios than other systems will always

have higher utilization ratios than those other systems? Explain.

2. In a job shop, effective capacity is only 50 percent of design capacity, and actual output is 80  percent of effective output. What design capacity would be needed to achieve an actual output of eight jobs per week?

3. A producer of pottery is considering the addition of a new plant to absorb the backlog of demand that now exists. The primary location being considered will have fixed costs of $9,200 per month and variable costs of 70 cents per unit produced. Each item is sold to retailers at a price that averages 90 cents. a. What volume per month is required in order to break even? b. What profit would be realized on a monthly volume of 61,000 units? 87,000 units? c. What volume is needed to obtain a profit of $16,000 per month? d. What volume is needed to provide a revenue of $23,000 per month?

PROBLEMS

ste24102_ch05_184-215.indd 212 11/10/13 6:59 PM

Summaries Chapters contain summaries that provide an overview of the material covered.

Key Points The key points of the chapter are emphasized.

Key Terms Key terms are highlighted in the text and then repeated in the margin with brief definitions for emphasis. They are listed at the end of each chapter (along with page references) to aid in reviewing.

Discussion and Review Questions Each chapter and each supplement have a list of discussion and review questions. These precede the problem sets and are intended to serve as a student self-review or as class dis- cussion starters.

Problem Sets Each chapter includes a set of problems for assignment. The problems have been refined over many editions and are intended to be challenging but doable for students. Short answers to most of the problems are included in Appendix A so that students can check their understanding and see immedi- ately how they are progressing.

Taking Stock and Critical Thinking Exercises These activities encourage analytical thinking and help broaden conceptual understanding. A question related to ethics is included in the Critical Thinking Exercises.

ste24102_fm_i-xxxv.indd xvste24102_fm_i-xxxv.indd xv 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

xvi

Bruegger's Bagel Bakery makes and sells a variety of bagels, includ- ing plain, onion, poppyseed, and cinnamon raisin, as well as assorted flavors of cream cheese. Bagels are the major source of revenue for the company.

The bagel business is a $3 billion industry. Bagels are very popular with consumers. Not only are they relatively low in fat, they are filling, and they taste good! Investors like the bagel industry because it can be highly profitable: it only costs about $.10 to make a bagel, and they can be sold for $.50 each or more. Although some bagel companies have done poorly in recent years, due mainly to poor management, Brueg- ger's business is booming; it is number one nationally, with over 450 shops that sell bagels, coffee, and bagel sandwiches for takeout or on- premise consumption. Many stores in the Bruegger's chain generate an average of $800,000 in sales annually.

Production of bagels is done in batches, according to flavor, with each flavor being produced on a daily basis. Production of bagels at Bruegger's begins at a processing plant, where the basic ingredients of flour, water, yeast, and flavorings are combined in a special mixing machine. After the dough has been thoroughly mixed, it is transferred to another machine that shapes the dough into individual bagels. Once the bagels have been formed, they are loaded onto refrigerated trucks for shipping to individual stores. When the bagels reach a store, they

output at each step in the process. At the stores, employees are instructed to watch for deformed bagels and to remove them when they find them. (Deformed bagels are returned to a processing plant where they are sliced into bagel chips, packaged, and then taken back to the stores for sale, thereby reducing the scrap rate.) Employees who work in the stores are care- fully chosen and then trained so that they are competent to operate the necessary equipment in the stores and to provide the desired level of service to customers.

The company operates with minimal inventories of raw materials and inventories of partially completed bagels at the plant and very little inventory of bagels at the stores. One reason for this is to maintain a high degree of freshness in the final product by continually supplying fresh product to the stores. A second reason is to keep costs down; minimal inventories mean less space is needed for storage.

Questions

1. Bruegger's maintains relatively little inventory at either its plants or its retail stores. List the benefits and risks of this policy.

2. Quality is very important to Bruegger's. a. What features of bagels do customers look at to judge their

quality?

OPERATIONS TOUR Bruegger's Bagel Bakery

(D f d b l

ste24102_ch13_548-605.indd 602 9/18/13 11:55 AM

Operations Tours These provide a simple “walkthrough” of an opera- tion for students, describing the company, its product or service, and its process of managing operations. Companies featured include Wegmans Food Markets, Morton Salt, Stickley Furniture, and Boeing.

Production of bagels is done in batches, according to flavor, with minimal inven

ons

gger reta

ty is hat f ality

Background Harvey Industries, a Wisconsin company, specializes in the assembly of high- pressure washer systems and in the sale of repair parts for these systems. The products range from small portable high-pressure washers to large industrial installations for snow removal from vehicles stored outdoors during the winter months. Typical uses for high-pressure water cleaning include:

Industrial customers include General Motors, Ford, Chrysler, Delta Airlines, United Parcel Service, and Shell Oil Company.

Although the industrial applications are a significant part of its sales, Harvey Industries is primarily an assembler of equipment for coin oper- ated self-service car wash systems. The typical car wash is of concrete block construction with an equipment room in the center, flanked on either side by a number of bays. The cars are driven into the bays where the owner can wash and wax the car, utilizing high-pressure hot water and liquid wax. A dollar bill changer is available to provide change for the use of the equipment and the purchase of various products from dispens- ers. The products include towels, tire cleaner, and upholstery cleaner.

CASE Harvey Industries

Automobiles Airplanes

Building maintenance Barns

Engines Ice cream plants

Lift trucks Machinery

Swimming pools

ste24102_ch13_548-605.indd 598 9/18/13 11:55 AM

Manufacturing manager

Sales manager

Purchasing manager

Controller

President

Stockroom foreman

Assembly foreman

Quality engineer

ste24102_ch13_548-605.indd 599 9/18/13 11:55 AM

Cases The text includes short cases. The cases were selected to provide a broader, more integrated thinking opportunity for students without taking a full case approach.

ste24102_fm_i-xxxv.indd xviste24102_fm_i-xxxv.indd xvi 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

xvii

INSTRUCTOR RESOURCES

Online Learning Center (OLC) www.mhhe.com/stevenson12e The Online Learning Center provides complete materials for study and review. At this book’s website, instructors have access to teaching supports such as electronic files of the ancillary materials: Solutions Manual, Instructor’s Manual, test bank, PowerPoint Lecture Slides, Digi- tal Image Library, and Excel Lecture scripts.

Instructor’s Manual. Prepared by Michael Godfrey, University of Wisconsin-Oshkosh, with contributions from William J. Stevenson, this manual includes teaching notes, chapter overview, an outline for each chapter, and solutions to the problems in the text.

Test Bank. Prepared by the Alan Cannon, University of Texas-Arlington, the Test Bank includes over 2,000 true/false, multiple-choice, and discussion questions/problems at varying levels of difficulty.

EZ Test Online. All test bank questions are available in EZ Test Online, a flexible elec- tronic testing program. The answers to all questions are given, along with a rating of the level of difficulty, chapter learning objective met, Bloom’s taxonomy question type, and the AACSB knowledge category.

PowerPoint Lecture Slides. Prepared by David Cook, Old Dominion University, the PowerPoint slides draw on the highlights of each chapter and provide an opportunity for the instructor to emphasize the key concepts in class discussions.

Digital Image Library. All the figures in the book are included for insertion in PowerPoint slides or for class discussion.

Excel Lecture Scripts. Prepared by Lee Tangedahl, University of Montana, the scripts provide suggestions on using Excel and the Excel templates in class.

Operations Management Video Series The operations management video series, free to text adopters, includes professionally devel- oped videos showing students applications of key manufacturing and service topics in real companies. Each segment includes on-site or plant footage, interviews with company manag- ers, and focused presentations of OM applications in use to help the companies gain competi- tive advantage. Companies such as Zappos, FedEx, Subaru, Disney, BP, Chase Bank, DHL, Louisville Slugger, McDonald’s, Noodles & Company, and Honda are featured.

STUDENT RESOURCES

Online Learning Center (OLC) www.mhhe.com/stevenson12e Students have access to study materials created specifically for the text.

• Quizzes—self-grading to assess knowledge of the material.

• PowerPoint Slides—give an overview of the chapter content.

• Excel Data Files—import into Excel for quick calculation and analysis.

• Study Outlines—provide a framework for taking notes.

• Screencam Tutorials—describe how to solve problems in the text (see below).

ste24102_fm_i-xxxv.indd xviiste24102_fm_i-xxxv.indd xvii 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

xviii

• Excel Templates—provide a handy Excel-based tool for solving problems in the text (see below).

• And more . . .

TABLE 3.1 Excel solution for Example 5

ste24102_ch03_074-133.indd 94 11/10/13 5:10 PM

Excel Templates Templates created by Lee Tangedahl, University of Montana, are included on the OLC. The templates, over 70 total, include dynamically linked graphics and variable controls. They allow you to solve a number of problems in the text or additional problems. All templates have been revised to allow formatting of all cells, hiding rows or columns, and entering data or calculations in blank cells. Many ofthe templates have been expanded to accommodate solving larger problems and cases.

Trend-Adjusted Exponential Smoothing A variation of simple exponential smoothing can be used when a time series exhibits a linear trend. It is called trend-adjusted exponential smoothing or, sometimes, double smoothing, to differentiate it from simple exponential smoothing, which is appropriate only when data vary around an average or have step or gradual changes. If a series exhibits trend, and simple smoothing is used on it, the forecasts will all lag the trend: If the data are increasing, each forecast will be too low; if decreasing, each forecast will be too high.

The trend-adjusted forecast (TAF) is composed of two elements: a smoothed error and a trend factor.

TAF 1 S Tt t t� �� (3–11)

where

S t   �  Previous forecast plus smoothed error

T t   �  Current trend estimate

and

TAF ( TAF )

(TAF TAF )1 1 1

S A

T T T

t t t t

t t t t t

� � � �

� � � � �� � � (3–12)

Trend-adjusted exponential smoothing  Variation of expo- nential smoothing used when a time series exhibits a linear trend.

SCREENCAM TUTORIAL

LO3.12 Prepare a trend- adjusted exponential smoothing forecast.

ste24102_ch03_074-133.indd 95 11/10/13 5:10 PM

ScreenCam Tutorials These screen “movies” and voiceover tutorials explain key chapter content, using Excel and other software platforms.

SCREENCAM TUTORIAL

ste24102_fm_i-xxxv.indd xviiiste24102_fm_i-xxxv.indd xviii 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

xix

CourseSmart (ISBN: 0077640403) CourseSmart is a convenient way to find and buy eTextbooks. At CourseSmart you can save up to 60 percent off the cost of a print textbook, reduce your impact on the environment, and gain access to powerful Web tools for learning. CourseSmart has the largest selection of eTextbooks available anywhere, offering thousands of the most commonly adopted textbooks from a wide variety of higher education publishers. CourseSmart eTextbooks are available in one standard online reader with full text search, notes and highlighting, and e-mail tools for sharing notes between classmates. Visit www.CourseSmart.com for more information.

E-LEARNING AND ASSESSMENT

McGraw-Hill Connect ® Operations Management McGraw-Hill Connect ® Operations Management is an online assignment and assessment solution that connects students with the tools and resources they’ll need to achieve success through faster learning, higher retention, and more efficient studying. It provides instructors with tools to quickly pick content and assignments according to the topics they want to emphasize.

Online Assignments. Connect Operations Management helps students learn more efficiently by providing practice material and feedback when they are needed. Connect grades homework automatically and provides feedback on any questions that students may have missed.

Integration of Excel Data Sets. A convenient feature is the inclusion of an Excel data file link in many problems using data files in their calculation. The link allows students to eas- ily launch into Excel, work the problem, and return to Connect to key in the answer.

ste24102_fm_i-xxxv.indd xixste24102_fm_i-xxxv.indd xix 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

xx

Guided Examples. These narrated video walkthroughs provide students with step-by-step guidelines for solving problems similar to those contained in the text. The student is given personalized instruction on how to solve a problem by applying the concepts presented in the chapter. The narrated voiceover shows the steps to take to work through an exercise. Students can go through each example multiple times if needed.

LearnSmart. LearnSmart adaptive self-study technology with Connect Operations Man- agement helps students make the best use of their study time. LearnSmart provides a seam- less combination of practice, assessment, and remediation for every concept in the textbook. LearnSmart’s intelligent software adapts to students by supplying questions on a new concept when students are ready to learn it. With LearnSmart students will spend less time on topics they understand and instead focus on the topics they need to master.

Simple Assignment Management and Smart Grading. When it comes to studying, time is precious. Connect Operations Management helps students learn more efficiently by providing feedback and practice material when they need it, where they need it. When it comes to teaching, your time also is precious. The grading function enables you to:

• Have assignments scored automatically, giving students immediate feedback on their work and side-by-side comparisons with correct answers.

• Access and review each response; manually change grades or leave comments for stu- dents to review.

Student Reporting. Connect Operations Management keeps instructors informed about how each student, section, and class is performing, allowing for more productive use of lec- ture and office hours. The progress-tracking function enables you to:

• View scored work immediately (Add Assignment Results Screen) and track individual or group performance with assignment and grade reports.

• Access an instant view of student or class performance relative to learning objectives.

• Collect data and generate reports required by many accreditation organizations, such as AACSB.

Student Resource Library. The Connect Business Statistics Student Library is the place for students to access additional resources. The Student Library provides quick access to recorded lectures, practice materials, eBooks, and more.

ste24102_fm_i-xxxv.indd xxste24102_fm_i-xxxv.indd xx 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

xxi

Instructor Library. The Connect Operations Management Instructor Library is your repos- itory for additional resources to improve student engagement in and out of class. You can select and use any asset that enhances your lecture. The Connect Business Statistics Instructor Library includes:

• eBook

• PowerPoint presentations

ste24102_fm_i-xxxv.indd xxiste24102_fm_i-xxxv.indd xxi 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

xxii

• Test Bank

• Instructor’s Manual

• Digital Image Library

Connect ® Plus Operations Management includes a seamless integration of an eBook and Connect Operations Management with rich functionality integrated into the product.

Integrated Media-Rich eBook. An integrated media-rich eBook allows students to access media in context with each chapter. Students can highlight, take notes, and access shared instructor highlights/notes to learn the course material.

Dynamic Links. Dynamic links between the problems or questions you assign to your stu- dents and the location in the eBook where that problem or question is covered.

Powerful Search Function. A powerful search function to pinpoint and connect key concepts in a snap. This state-of-the-art, thoroughly tested system supports you in prepar- ing students for the world that awaits. For more information about Connect, go to www. mcgrawhillconnect.com or contact your local McGraw-Hill sales representative.

SmartBook SmartBook is the first and only adaptive reading experience avaible today. SmartBook changes reading from a passive and linear experience, to an engaging and dynamic one, in which students are more likely to master and retain important concepts, com- ing to class better prepared. Valuable reports provide instructors insight as to how students are progressing through textbook content, and are useful for shaping in-class time or assessment.

This revolutionary technology suite is available only from McGraw-Hill Education. To learn more, go to http://learnsmartadvantage.com/ or contact your representative for a demo.

ste24102_fm_i-xxxv.indd xxiiste24102_fm_i-xxxv.indd xxii 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

xxiii

Tegrity Campus: Lectures 24/7 Tegrity Campus is a service that makes class time available 24/7 by automatically capturing every lecture in a searchable format for students to review when they study and complete assignments. With a simple one-click start-and-stop process, you capture all computer screens and corresponding audio. Students can replay any part of any class with easy-to-use browser- based viewing on a PC or Mac.

Educators know that the more students can see, hear, and experience class resources, the better they learn. In fact, studies prove it. With Tegrity Campus, students quickly recall key moments by using Tegrity Campus ’s unique search feature. This search helps students effi- ciently find what they need, when they need it, across an entire semester of class recordings. Help turn all your students’ study time into learning moments immediately supported by your lecture. To learn more about Tegrity, watch a two-minute Flash demo at http://tegritycampus. mhhe.com .

Online Course Management No matter what online course management system you use (WebCT, BlackBoard, or eCollege), we have a course content ePack available for your course. Our new ePacks are specifically designed to make it easy for students to navigate and access content online. For help, our online Digital Learning Consultants are ready to assist you with your online course needs. They provide training and will answer any questions you have throughout the life of your adoption. McGraw-Hill Higher Education and Blackboard have teamed up. What does this mean for you?

1. Single sign-on. Now you and your students can access McGraw-Hill’s Connect and Create right from within your Blackboard course—all with one single sign-on.

2. Deep integration of content and tools. You get a single sign-on with Connect and Create, and you also get integration of McGraw-Hill content and content engines right into Blackboard. Whether you’re choosing a book for your course or building Connect assignments, all the tools you need are right where you want them—inside of Blackboard.

3. One gradebook. Keeping several gradebooks and manually synchronizing grades into Blackboard is no longer necessary. When a student completes an integrated Connect assignment, the grade for that assignment automatically (and instantly) feeds your Blackboard grade center.

4. A solution for everyone. Whether your institution is already using Blackboard or you just want to try Blackboard on your own, we have a solution for you. McGraw-Hill and Blackboard can now offer you easy access to industry-leading technology and content, whether your campus hosts it, or we do. Be sure to ask your local McGraw-Hill representative for details.

McGraw-Hill Create™ The future of custom publishing is here. McGraw- Hill CreateTM is a new, self-service website that allows you to quickly and easily create custom course materials by drawing upon McGraw-Hill’s compre-

hensive, cross-disciplinary content and other third party resources. Creating your own custom

ste24102_fm_i-xxxv.indd xxiiiste24102_fm_i-xxxv.indd xxiii 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

xxiv

book is easy. You, as an instructor, can: third party resources. Creating your own custom book is easy. You, as an instructor, can:

• Select, then arrange the content in a way that makes the most sense for your course.

• Combine material from different sources and even upload your own content.

• Choose the best format for your students—print or eBook.

• Edit and update your course materials as often as you’d like.

• Receive your PDF review copy in minutes or a print review copy in just a few days.

Begin creating now at www.mcgrawhillcreate.com.

Connect/LearnSmart Packaging Options: Connect with LearnSmart 1 Semester Access Card: 0077640349 Connect Plus with LearnSmart 1 Semester Access Card: 0077640357

McGraw-Hill Customer Experience Contact Information At McGraw-Hill, we understand that getting the most from new technology can be chal- lenging. That’s why our services don’t stop after you purchase our products. You can e-mail our Product Specialists 24 hours a day to get product training online. Or you can search our knowledge bank of Frequently Asked Questions on our support website. For Customer Sup- port, call 800-331-5094, or visit www.mhhe.com/support . One of our Customer Experience Team members will be able to assist you in a timely fashion.

ASSURANCE OF LEARNING READY Many educational institutions today are focused on the notion of assurance of learning, an important element of some accreditation standards. Operations Management is designed spe- cifically to support your assurance of learning initiatives with a simple, yet powerful, solution.

Each test bank question for Operations Management maps to a specific chapter learning outcome/objective listed in the text. You can use our test bank software, EZ Test and EZ Test Online, or Connect Operations Management to easily query for learning outcomes/objectives that directly relate to the learning objectives for your course. You can then use the reporting features of EZ Test to aggregate student results in similar fashion, making the collection and presentation of assurance of learning data simple and easy.

AACSB STATEMENT McGraw-Hill Education is a proud corporate member of AACSB International. Understand- ing the importance and value of AACSB accreditation, Operations Management recognizes the curricula guidelines detailed in the AACSB standards for business accreditation by con- necting selected questions in the test bank to the six general knowledge and skill areas in the AACSB’s Assessment of Learning Standards.

The statements contained in Operations Management are provided only as a guide for the users of this textbook. The AACSB leaves content coverage and assessment within the purview of individual schools, the mission of the school, and the faculty. While Operations Management and the teaching package make no claim of any specific AACSB qualification or evaluation, we have within the test bank labeled questions according to the six general knowledge and skill areas.

ste24102_fm_i-xxxv.indd xxivste24102_fm_i-xxxv.indd xxiv 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

xxv

4. Recognize applications of the concepts and techniques covered.

5. Discuss the subject matter in some depth, including its relevance, managerial considerations, and advantages and limitations.

You will encounter a number of chapter supplements. Check with your instructor to determine whether to study them.

This book places an emphasis on problem solving. There are many examples throughout the text illustrating solutions. In addition, at the end of most chapters and supplements you will find a group of solved problems. The examples within the chapter itself serve to illustrate concepts and techniques. Too much detail at those points would be counterproductive. Yet, later on, when you begin to solve the end-of-chapter problems, you will find the solved problems quite helpful. Moreover, those solved problems usually illustrate more and different details than the problems within the chapter.

I suggest the following approach to increase your chances of getting a good grade in the course:

1. Look over the chapter outline and learning objectives.

2. Read the chapter summary, and then skim the chapter.

3. Read the chapter and take notes.

4. Look over and try to answer the discussion and review questions.

5. Solve the problems, referring to the solved problems and chapter examples as needed.

6. Take the quizzes on the text’s website.

Note that the answers to many problems are given at the end of the book. Try to solve each problem before turning to the answer. Remember—tests don’t come with answers.

An Online Learning Center ( www.mhhe.com/ stevenson12e ) is also available, containing many of the same study tools found in the text.

And here is one final thought: Homework is on the High- way to Happiness! Enjoy the journey!

W.J.S.

The material in this text is part of the core knowledge in your education. Consequently, you will derive considerable ben- efit from your study of operations management, regardless of your major. Practically speaking, operations is a course in management.

This book describes principles and concepts of operations management. You should be aware that many of these prin- ciples and concepts are applicable to other aspects of your professional and personal life. You can expect the benefits of your study of operations management to serve you in those other areas as well.

Some students approach this course with apprehension, and perhaps even some negative feelings. It may be that they have heard that the course contains a certain amount of quan- titative material that they feel uncomfortable with, or that the subject matter is dreary, or that the course is about “fac- tory management.” This is unfortunate, because the subject matter of this book is interesting and vital for all business students. While it is true that some of the material is quan- titative, numerous examples, solved problems, and answers at the back of the book will help you with the quantitative material. As for “factory management,” there is material on manufacturing as well as on services. Manufacturing is important, and something that you should know about for a number of reasons. Look around you. Most of the “things” you see were manufactured: cars, trucks, planes, cloth- ing, shoes, computers, books, pens and pencils, desks, and cell phones. And these are just the tip of the iceberg. So it makes sense to know something about how these things are produced. Beyond all that is the fact that manufacturing is largely responsible for the high standard of living people have in industrialized countries.

After reading each chapter or supplement in the text, attending related classroom lectures, and completing assigned questions and problems, you should be able to do each of the following:

1. Identify the key features of that material.

2. Define and use terminology.

3. Solve typical problems.

Note to Students

ste24102_fm_i-xxxv.indd xxvste24102_fm_i-xxxv.indd xxv 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

and a table; add a solved problems and three new problems; and provided additional guidance in the use of several formulas.

Chapter 8: Added content on automation; added a reading and deleted several readings; and moved the Clicks or Bricks reading to the supply chain chapter.

Chapter 8S. This supplement has been moved to the Online Learning Center.

Chapter 9: Rearranged the sequence of some topics to improve the flow; shortened the chapter; Deleted several read- ings; and added material on Six Sigma.

Chapter 10: Modified several diagrams to improve under- standing; added a Critical Thinking Exercise; and modified the formula summary table to make it easier to select the appropriate formula.

Chapter 10S: This supplement has been moved to the Online Learning Center.

Chapter 11: Added more explanation of aggregation; added three new problems and renumbered some problems; and added an excel screenshot.

Chapter 12: Revised the introduction completely; added detail to the starting tree diagram; added new material on ERP, including a new figure; added a setup guide for devel- oping an MRP plan; added a new solved problem and a new problem; and deleted the last part of problem 9.

Chapter 13: Revised the chapter opening material; updated Example 3; added more explanation of the EPQ model; and added a new problem 1 and revised problems 2, 11, 27 and 28.

Chapter 14: Added a description of the characteristics of lean systems; added benefits and risks of lean systems; deleted a reading; added a reading; and added more material on value stream mapping.

Chapter 15: Added new sections on risk and resiliency, shortening the supply chain, and small businesses; added a new reading; added material on ERP and the supply chain; added some material on CPFR and SCORE; and added the Clicks and Bricks reading from chapter 8.

Chapter 16: Added some excel screen shots for clarity. Chapter 17: Revised the description of project cycle and

definition of terms; added a new Solved Problem; revised problems so they can be solved using either AOA or AON.

Chapter 18: Deleted readings on hotels and waiting at stop lights; added some starter problems.

All Chapters Major sections within each chapter are numbered for easy reference.

Learning objectives are positioned with related content within each chapter.

Many minor changes have been made to improve clarity and understanding.

The Bibliography & Additional Reading sections have been updated/revised.

Most Chapters Learning Objectives have been revised to incorporate new content. Questions have been added to some readings that did not have questions.

Additional Changes Chapter 1: Updated product examples to make them more current; changed the sequence of some content; updated the reading on why manufacturing matters; added opera- tions management job descriptions; added new readings on analytics and agility; and added a format to guide problem solving.

Chapter 2: Added examples of Balanced Scorecard fac- tors; added new reading on productivity advantage; and added the USPS sustainability scorecard to the USPS reading

Chapter 3: Added a simpler example to illustrate seasonal computations; revised Discussion and Review question 4; revised problems 2, 5, and 23; renumbered problems 8-18; added new problem 13.

Chapter 4: Added a reading; added several Discussion and Review Questions; and updated Problem 1.

Chapter 5: Added formula (and renumbered the formulas); added a new example; added a new Solved Problem; added a new Critical Thinking Exercise; and added five new problems.

Chapter 6: Modified the introduction to process selection and the figure that relates volume and variety to process type; added content on RFID tags; added a reading and deleted two readings; added material on restaurant and hospital layouts and a reading on the hospital room of the future; and added a Critical Thinking Exercise.

Chapter 7: Changed the sequence of topics slightly to improve the flow; shortened the chapter by deleting a few lists

Chapter-by-Chapter Revisions for the Twelfth Edition

xxvi

ste24102_fm_i-xxxv.indd xxviste24102_fm_i-xxxv.indd xxvi 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

xxvii

Preface vii 1 Introduction to Operations Management 2

2 Competitiveness, Strategy, and Productivity 40

3 Forecasting 74

4 Product and Service Design 134

SUPPLEMENT TO CHAPTER 4: Reliability 171

5 Strategic Capacity Planning for Products and Services 184

SUPPLEMENT TO CHAPTER 5: Decision Theory 216

6 Process Selection and Facility Layout 236

7 Work Design and Measurement 288

SUPPLEMENT TO CHAPTER 7: Learning Curves 325

8 Location Planning and Analysis 336

9 Management of Quality 366

10 Quality Control 410

11 Aggregate Planning and Master Scheduling 456

12 MRP and ERP 494

13 Inventory Management 546

14 JIT and Lean Operations 604

SUPPLEMENT TO CHAPTER 14: Maintenance 640

15 Supply Chain Management 648

16 Scheduling 688

17 Project Management 730

18 Management of Waiting Lines 782

19 Linear Programming 822

Appendix A: Answers to Selected Problems 854 Appendix B: Tables 867 Appendix C: Working with the Normal Distribution 872 Photo Credits 877 Company Index 878 Subject Index 880

Brief Contents

ste24102_fm_i-xxxv.indd xxviiste24102_fm_i-xxxv.indd xxvii 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

xxviii

Reading: AMAZON Tops in Customer Service 45

Operations Strategy 51

Reading: Productivity Gains Curb Inflation 53

Implications of Organization Strategy for Operations Management 54

Transforming Strategy into Action: The Balanced Scorecard 54

Productivity 56

Readings: Why Productivity Matters 59

Dutch Tomato Growers’ Productivity Advantage 60

Productivity Improvement 62 Summary 62 Key Points 62 Key Terms 63 Solved Problems 63 Discussion and Review Questions 64 Taking Stock 64 Critical Thinking Exercises 65 Problems 65

Cases: An American Tragedy: How a Good Company Died 66

Home-Style Cookies 67

Hazel Revisited 69

“Your Garden Gloves” 69

Operations Tour: The U.S. Postal Service 70

Selected Bibliography and Further Readings 73

3 Forecasting 74 Introduction 75

Features Common to All Forecasts 77

Elements of a Good Forecast 78

Forecasting and the Supply Chain 78

Steps in the Forecasting Process 79

Forecast Accuracy 79

Preface vii 1 Introduction to Operations

Management 2 Introduction 3

Production of Goods Versus Providing Services 7

Why Learn About Operations Management? 9

Career Opportunities and Professional Societies 11

Process Management 12

The Scope of Operations Management 14

Reading: Why Manufacturing Matters 17

Operations Management and Decision Making 17

Reading: Analytics 20

The Historical Evolution of Operations Management 21

Operations Today 24

Reading: Agility Creates a Competitive Edge 26

Key Issues for Today’s Business Operations 27

Readings: Universities Embrace Sustainability 28

Diet and the Environment: Vegetarian vs. Nonvegetarian 29

Summary 36 Key Points 36 Key Terms 36 Discussion and Review Questions 36 Taking Stock 37 Critical Thinking Exercises 37

Case: Hazel 37

Selected Bibliography and Further Readings 38 Problem-Solving Guide 38

2 Competitiveness, Strategy, and Productivity 40 Introduction 41

Competitiveness 42

Mission And Strategies 44

Contents

ste24102_fm_i-xxxv.indd xxviiiste24102_fm_i-xxxv.indd xxviii 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

Contents xxix

Readings: Best Buy Wants Your Junk 145

Kraft Foods’ Recipe for Sustainability 146

Xerox Diverts 2 Billion Pounds of Waste from Landfills through Green Initiatives 147

Recycle City: Maria’s Market 148

Other Design Considerations 149

Reading: Lego A/S in the Pink 151

Phases in Product Design and Development 159

Designing for Production 160

Service Design 162

Reading: The Challenges of Managing Services 166

Operations Strategy 167 Summary 167 Key Points 168 Key Terms 168 Discussion and Review Questions 168 Taking Stock 169 Critical Thinking Exercises 169 Problems 169

Operations Tour: High Acres Landfill 170

Selected Bibliography and Further Readings 170

SUPPLEMENT TO CHAPTER 4: Reliability 171

5 Strategic Capacity Planning for Products and Services 184 Introduction 185

Reading: Excess Capacity Can Be Bad News! 186

Capacity Decisions Are Strategic 187

Defining and Measuring Capacity 188

Determinants of Effective Capacity 189

Strategy Formulation 191

Forecasting Capacity Requirements 192

Additional Challenges of Planning Service Capacity 194

Do it In-House or Outsource It? 195

Developing Capacity Strategies 196

Reading: My Compliments to the Chef, er, Buyer 196

Reading: High Forecasts Can Be Bad News 80

Approaches to Forecasting 82

Qualitative Forecasts 82

Forecasts Based on Time-Series Data 84

Associative Forecasting Techniques 100

Monitoring Forecast Error 106

Choosing a Forecasting Technique 110

Using Forecast Information 112

Computer Software in Forecasting 112

Reading: Gazing at the Crystal Ball 113

Summary 114 Key Points 115 Key Terms 117 Solved Problems 117 Discussion and Review Questions 123 Taking Stock 124 Critical Thinking Exercises 124 Problems 124

Cases: M&L Manufacturing 132

Highline Financial Services, Ltd. 133 Selected Bibliography and Further Readings 133

4 Product and Service Design 134 Introduction 136

Readings: Design as a Business Strategy 136

Product Redesign, Not Offshoring, Holds Cost Advantage for U.S. Manufacturers 137

Dutch Boy Brushes Up Its Paints 138

Idea Generation 139

Reading: Vlasic on a Roll with Huge Pickle Slices 140

Legal and Ethical Considerations 141

Human Factors 142

Cultural Factors 143

Global Product and Service Design 143

Reading: Do You Want Pickled Beets with That? 143

Environmental Factors: Sustainability 144

ste24102_fm_i-xxxv.indd xxixste24102_fm_i-xxxv.indd xxix 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

xxx Contents

Methods Analysis 299

Motion Study 303

Work Measurement 305

Operations Strategy 316 Summary 317 Key Points 317 Key Terms 318 Solved Problems 319 Discussion and Review Questions 319 Taking Stock 320 Critical Thinking Exercise 320 Problems 320

Case: Making Hotplates 323

Selected Bibliography and Further Readings 324

SUPPLEMENT TO CHAPTER 7: Learning Curves 325

8 Location Planning and Analysis 336 The Need for Location Decisions 337

The Nature of Location Decisions 338

Global Locations 340

General Procedure for Making Location Decisions 342

Identifying a Country, Region, Community, and Site 343

Reading: Innovative MCI Unit Finds Culture Shock in Colorado Springs 344

Service and Retail Locations 351

Reading: Site Selection Grows Up: Improved Tech Tools Make the Process Faster, Better 352

Evaluating Location Alternatives 353 Summary 358 Key Points 358 Key Terms 359 Solved Problems 359 Discussion and Review Questions 360 Taking Stock 360 Critical Thinking Exercises 361 Problems 361

Case: Hello, Walmart? 364

Selected Bibliography and Further Readings 364

9 Management of Quality 366 Introduction 367

The Evolution of Quality Management 368

Constraint Management 201

Evaluating Alternatives 201

Operations Strategy 207 Summary 207 Key Points 208 Key Terms 208 Solved Problems 208 Discussion and Review Questions 211 Taking Stock 211 Critical Thinking Exercises 211 Problems 212

Case: Outsourcing of Hospital Services 215

Selected Bibliography and Further Readings 215

SUPPLEMENT TO CHAPTER 5: Decision Theory 216

6 Process Selection and Facility Layout 236 Introduction 237

Process Selection 238

Technology 244

Reading: Foxconn Shifts Its Focus to Automation 246

Process Strategy 249

Strategic Resource Organization: Facilities Layout 250

Reading: A Safe Hospital Room of the Future 260

Designing Product Layouts: Line Balancing 262

Reading: BMW’s Strategy: Flexibility 270

Designing Process Layouts 271 Summary 275 Key Points 276 Key Terms 276 Solved Problems 276 Discussion and Review Questions 280 Taking Stock 280 Critical Thinking Exercises 280 Problems 281 Selected Bibliography and Further Readings 287

7 Work Design and Measurement 288 Introduction 289

Job Design 289

Quality of Work Life 294

Reading: Choosing Incentive Plans 298

ste24102_fm_i-xxxv.indd xxxste24102_fm_i-xxxv.indd xxx 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

Contents xxxi

Statistical Process Control 417 Process Capability 435 Operations Strategy 440

Reading: Bar Codes Might Cut Drug Errors in Hospitals 441

Summary 441 Key Points 441 Key Terms 441 Solved Problems 443 Discussion and Review Questions 447 Taking Stock 448 Critical Thinking Exercises 448 Problems 448

Cases: Toys, Inc. 454 Tiger Tools 454

Selected Bibliography and Further Readings 455

11 Aggregate Planning and Master Scheduling 456 Introduction 458

Reading: Duplicate Orders Can Lead to Excess Capacity 462

Basic Strategies for Meeting Uneven Demand 465 Techniques for Aggregate Planning 468 Aggregate Planning in Services 475 Disaggregating the Aggregate Plan 477 Master Scheduling 477 The Master Scheduling Process 478 Summary 483 Key Points 483 Key Terms 484 Solved Problems 484 Discussion and Review Questions 487 Taking Stock 487 Critical Thinking Exercise 487 Problems 487

Case: Eight Glasses a Day (EGAD) 492

Selected Bibliography and Further Readings 492

12 MRP and ERP 494 Introduction 495 An Overview of MRP 495 MRP Inputs 496 MRP Processing 500 MRP Outputs 507 Other Considerations 508

Reading: Whatever Happened to Quality? 368

The Foundations of Modern Quality Management: The Gurus 369

Insights on Quality Management 372

Readings: The Sounds of Quality 374

Hyundai: Kissing Clunkers Goodbye 378

Quality Awards 380

Reading: Rework and Morale 380

Quality Certification 381

Quality and the Supply Chain 383

Total Quality Management 384

Reading: Improving Quality and Reducing Risk in Offshoring 384

Problem Solving and Process Improvement 388

Reading: What Keeps Six Sigma Practitioners Up at Night? 391

Quality Tools 392

Reading: Benchmarking Corporate Web Sites of Fortune 500 Companies 400

Operations Strategy 400 Summary 400 Key Points 401 Key Terms 401 Solved Problem 401 Discussion and Review Questions 402 Taking Stock 403 Critical Thinking Exercises 403 Problems 403

Cases:

Chick-n-Gravy Dinner Line 405

Tip Top Markets 406 Selected Bibliography and Further Readings 408

10 Quality Control 410 Introduction 411

Inspection 412

Reading: In the Chips at Jays 415

ste24102_fm_i-xxxv.indd xxxiste24102_fm_i-xxxv.indd xxxi 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

xxxii Contents

Cases:

UPD Manufacturing 596 Harvey Industries 596 Grill Rite 598 Farmers Restaurant 599 Operations Tours:

Bruegger’s Bagel Bakery 600 PSC, Inc. 601

Selected Bibliography and Further Readings 603

14 JIT and Lean Operations 604 Introduction 606

Reading: Toyota Recalls 608

Supporting Goals 609

Building Blocks 610

Readings: General Mills Turns to NASCAR to Reduce Changeover Time 612 “People” Firms Boost Profits, Study Shows 617

Lean Tools 627

Transitioning to a Lean System 629

Reading: Nearby Suppliers Match Ford’s Mix 629

Lean Services 630

Reading: To Build a Better Hospital, Virginia Mason Takes Lessons from Toyota Plants 632

JIT II 633

Operations Strategy 633 Summary 634 Key Points 635 Key Terms 635 Solved Problems 635 Discussion and Review Questions 636 Taking Stock 636 Critical Thinking Exercises 636 Problems 636

Case:

Level Operations 637

Operations Tour:

Boeing 638 Selected Bibliography and Further Readings 639

SUPPLEMENT TO CHAPTER 14: Maintenance 640

MRP in Services 510

Benefits and Requirements of MRP 510

MRP II 511

Capacity Requirements Planning 513

ERP 516

Readings: The ABCs of ERP 518

The Top 10 ERP Mistakes 522

Operations Strategy 524 Summary 524 Key Points 524 Key Terms 525 Solved Problems 525 Discussion and Review Questions 534 Taking Stock 534 Critical Thinking Exercises 535 Problems 535

Cases: Promotional Novelties 540

DMD Enterprises 541

Operations Tour: Stickley Furniture 541

Selected Bibliography and Further Readings 544

13 Inventory Management 546 Introduction 547

The Nature and Importance of Inventories 548

Requirements for Effective Inventory Management 551

Reading: Radio Frequency Identification (RFID) Tags 553

Inventory Ordering Policies 557

How Much to Order: Economic Order Quantity Models 557

Reorder Point Ordering 569

How Much to Order: Fixed-Order-Interval Model 573

The Single-Period Model 576

Operations Strategy 581 Summary 581 Key Points 581 Key Terms 582 Solved Problems 583 Discussion and Review Questions 588 Taking Stock 588 Critical Thinking Exercises 588 Problems 589

ste24102_fm_i-xxxv.indd xxxiiste24102_fm_i-xxxv.indd xxxii 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

Contents xxxiii

Cases:

Master Tag 685

B&L Inc. 686 Selected Bibliography and Further Readings 687

16 Scheduling 688 Scheduling Operations 690

Scheduling in Low-Volume Systems 693

Scheduling Services 711

Readings: Servicing Passenger Planes 713

Summary 716 Key Points 716 Key Terms 716 Solved Problems 716 Discussion and Review Questions 721 Taking Stock 721 Critical Thinking Exercises 721 Problems 722

Case:

Hi-Ho, Yo-Yo, Inc. 728 Selected Bibliography and Further Readings 728

17 Project Management 730 Introduction 732

Project Life Cycle 732

Behavioral Aspects of Project Management 733

Reading: Project Managers Have Never Been More Critical 737

Work Breakdown Structure 739

Planning and Scheduling with Gantt Charts 739

PERT and CPM 740

Deterministic Time Estimates 743

A Computing Algorithm 744

Probabilistic Time Estimates 751

Determining Path Probabilities 754

Simulation 756

Budget Control 757

Time–Cost Trade-Offs: Crashing 757

Advantages of Using PERT and Potential Sources of Error 760

Critical Chain Project Management 761

Other Topics in Project Management 761

15 Supply Chain Management 648 Introduction 649

Reading: Veggie Tales 652

Trends in Supply Chain Management 653

Reading: At 3M, a Long Road Became a Shorter Road 655

Global Supply Chains 656

ERP and Supply Chain Management 656

Ethics and the Supply Chain 657

Small Businesses 657

Management Responsibilities 658

Procurement 660

E-Business 663

Readings: IBM’s Supply Chain Social Responsibility 663 Desperately Seeking E-Fulfillment 665 E-Procurement at IBM 666

Supplier Management 667

Reading: NestléUSA and Ocean Spray Form Strategic Operations Alliance 669

Inventory Management 670

Order Fulfillment 671

Logistics 672

Operations Tour: Wegmans’ Shipping System 673

Readings: Springdale Farm 675

RFID Tags: Keeping the Shelves Stocked 675 Active RFID vs. Passive RFID 676 Rise of the 3PL 677

Creating An Effective Supply Chain 678

Reading: Clicks or Bricks, or Both? 679

Strategy 683 Summary 683 Key Points 684 Key Terms 684 Discussion and Review Questions 684 Taking Stock 684 Critical Thinking Exercises 685 Problems 685

ste24102_fm_i-xxxv.indd xxxiiiste24102_fm_i-xxxv.indd xxxiii 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

xxxiv Contents

Taking Stock 815 Critical Thinking Exercises 815 Problems 816

Case: Big Bank 819

Readings: Stopped at a Light? Why Not Read This, You May Have Time 819

Selected Bibliography and Further Readings 821

19 Linear Programming 822 Introduction 823

Linear Programming Models 824

Graphical Linear Programming 826

The Simplex Method 838

Computer Solutions 838

Sensitivity Analysis 841

Summary 844 Key Points 844 Key Terms 844 Solved Problems 844 Discussion and Review Questions 847 Problems 847

Cases: Son, Ltd. 851

Custom Cabinets, Inc. 852

Selected Bibliography and Further Readings 853

Appendix A Answers to Selected Problems 854

Appendix B Tables 867

Appendix C Working with the Normal Distribution 872

Photo Credits 877 Company Index 878 Subject Index 880

Project Management Software 762

Risk Management 763 Summary 764 Key Points 765 Key Terms 765 Solved Problems 765 Discussion and Review Questions 772 Taking Stock 772 Critical Thinking Exercises 772 Problems 772

Cases: The Case of the Mexican Crazy Quilt 779

Time, Please 781 Selected Bibliography and Further Readings 781

18 Management of Waiting Lines 782 Why is There Waiting? 784

Managerial Implications of Waiting Lines 785

Goal of Waiting-Line Management 785

Reading: New Yorkers do not Like Waiting in Line 785

Characteristics of Waiting Lines 786

Measures of Waiting-Line Performance 790

Queuing Models: Infinite-Source 790

Queuing Model: Finite-Source 805

Constraint Management 810

The Psychology of Waiting 811

Readings: David H. Maister on the Psychology of Waiting 811

Managing Waiting Lines at Disney World 812

Operations Strategy 812 Summary 812 Key Points 813 Key Terms 813 Solved Problems 813 Discussion and Review Questions 815

ste24102_fm_i-xxxv.indd xxxivste24102_fm_i-xxxv.indd xxxiv 11/29/13 12:52 AM11/29/13 12:52 AM

Final PDF to printer

This page intentionally left blank

2

CHAPTER OUTLINE

1.1 Introduction, 3 1.2 Production of Goods versus

Providing Services, 7 1.3 Why Learn about Operations

Management?, 9 1.4 Career Opportunities and Professional

Societies, 11 1.5 Process Management, 12

Managing a Process to Meet Demand, 13

Process Variation, 13

1.6 The Scope of Operations Management, 14 Managing the Supply Chain to Achieve Schedule, Cost, and Quality Goals, 15

1.7 Operations Management and Decision Making, 17 Models, 18

Quantitative Approaches, 19

Performance Metrics, 19

Analysis of Trade-Offs, 19

Degree of Customization, 20

A Systems Approach, 20

Establishing Priorities, 20

1.8 The Historical Evolution of Operations Management, 21 The Industrial Revolution, 21

Scientific Management, 21

The Human Relations Movement, 23

Decision Models and Management Science, 23

The Influence of Japanese Manufacturers, 24

1.9 Operations Today, 24

1.10 Key Issues for Today’s Business Operations, 27 Environmental Concerns, 27

Ethical Conduct, 29

The Need to Manage the Supply Chain, 31

Elements of Supply Chain Management, 32

Operations Tour: Wegmans Food Markets, 33

Case: Hazel, 37

Problem Solving Guide, 38

C H A P T E R

1 Introduction to Operations Management

After completing this chapter, you should be able to:

LO1.1 Define the terms operations management and supply chain.

LO1.2 Identify similarities and differences between production and service operations.

LO1.3 Explain the importance of learning about operations management.

LO1.4 Identify the three major functional areas of organizations and describe how they interrelate.

LO1.5 Summarize the two major aspects of process management.

LO1.6 Describe the operations function and the nature of the operations manager’s job.

LO1.7 Explain the key aspects of operations management decision making.

LO1.8 Briefly describe the historical evolution of operations management.

LO1.9 Describe current issues in business that impact operations management.

LO1.10 Explain the need to manage the supply chain.

LEARNING OBJECTIVES

ste24102_ch01_002-039.indd 2ste24102_ch01_002-039.indd 2 11/10/13 4:05 PM11/10/13 4:05 PM

Final PDF to printer

3

1.1 INTRODUCTION Operations is that part of a business organization that is responsible for producing goods and/or services. Goods are physical items that include raw materials, parts, subassemblies such as motherboards that go into computers, and final products such as cell phones and automobiles. Services are activities that provide some combination of time, location, form, or psychological value. Examples of goods and services are found all around you. Every book you read, every video you watch, every e-mail or text message you send, every tele- phone conversation you have, and every medical treatment you receive involves the opera- tions function of one or more organizations. So does everything you wear, eat, travel in, sit on, and access the Internet with. The operations function in business can also be viewed from a more far-reaching perspective: The collective success or failure of companies’ oper- ations functions has an impact on the ability of a nation to compete with other nations, and on the nation’s economy.

Goods  Physical items produced by business organizations.

Services  Activities that provide some combination of time, location, form, and psychological value.

This book is about operations management. The subject mat- ter is relevant for you regardless of your major. Productivity, quality, e-business, competition, and customer satisfaction are important for every aspect of a business organization. This first chapter presents an introduction and overview of operations management. Among the issues it addresses are: What is opera- tions management? Why is it important? What do operations management professionals do?

The chapter also provides an interesting description of the historical evolution of operations management and a discussion of the trends and issues that impact operations management.

You will learn about (1) the economic balance that every business organization seeks to achieve; (2) the condition that generally exists that makes achieving the economic balance challenging; (3) the line function that is the core of every business organization; (4) key steps in the history and evolution of operations management; (5) the differences and similarities between producing products and delivering services; (6) what a supply chain is, and why it is essential to manage it; and (7) the key issues for today’s business operations.

Recalls of automobiles, foods, toys, and other products; major oil spills; and even dysfunctional state and federal legislatures are all examples of operations failures. They underscore the need for effective operations management. Examples of operations successes include the many elec- tronic devices we all use, medical breakthroughs in diag- nosing and treating ailments, and high-quality goods and services that are widely available.

ste24102_ch01_002-039.indd 3ste24102_ch01_002-039.indd 3 11/10/13 4:05 PM11/10/13 4:05 PM

Final PDF to printer

4 Chapter One Introduction to Operations Management

The ideal situation for a business organization is to achieve an economic match of sup- ply and demand. Having excess supply or excess capacity is wasteful and costly; having too little means lost opportunity and possible customer dissatisfaction. The key func- tions on the supply side are operations and supply chains, and sales and marketing on the demand side.

While the operations function is responsible for producing products and/or delivering ser- vices, it needs the support and input from other areas of the organization. Business organi- zations have three basic functional areas, as depicted in Figure 1.1 : finance, marketing, and operations. It doesn’t matter whether the business is a retail store, a hospital, a manufacturing firm, a car wash, or some other type of business; all business organizations have these three basic functions.

Finance is responsible for securing financial resources at favorable prices and allocating those resources throughout the organization, as well as budgeting, analyzing investment pro- posals, and providing funds for operations. Marketing is responsible for assessing consumer wants and needs, and selling and promoting the organization’s goods or services. Operations is responsible for producing the goods or providing the services offered by the organiza- tion. To put this into perspective, if a business organization were a car, operations would be its engine. And just as the engine is the core of what a car does, in a business organization, operations is the core of what the organization does. Operations management is responsible for managing that core. Hence, operations management is the management of systems or processes that create goods and/or provide services.

Operations and supply chains are intrinsically linked, and no business organization could exist without both. A supply chain is the sequence of organizations—their facilities, func- tions, and activities—that are involved in producing and delivering a product or service. The sequence begins with basic suppliers of raw materials and extends all the way to the final customer, as seen in Figure 1.2 . Facilities might include warehouses, factories, processing centers, offices, distribution centers, and retail outlets. Functions and activities include fore- casting, purchasing, inventory management, information management, quality assurance, scheduling, production, distribution, delivery, and customer service. Figure  1.3 provides another illustration of a supply chain: a chain that begins with wheat growing on a farm and ends with a customer buying a loaf of bread in a supermarket. Note that the value of the prod- uct increases as it moves through the supply chain.

Supply chains are both external and internal to the organization. The external parts of a supply chain provide raw materials, parts, equipment, supplies, and/or other inputs to the organization, and they deliver outputs that are goods to the organization’s customers. The internal parts of a supply chain are part of the operations function itself, supply- ing operations with parts and materials, performing work on products, and/or performing services.

LO1.1 Define the terms operations management and supply chain.

Operations management   The management of systems or processes that create goods and/ or provide services.

Supply chain  A sequence of activities and organizations involved in producing and deliv- ering a good or service.

FIGURE 1.1 The three basic functions of business organizations

Organization

Operations MarketingFinance

FIGURE 1.2 A simple product supply chain

Final customersDistributorProducer

Direct suppliers

Suppliers’ suppliers

ste24102_ch01_002-039.indd 4ste24102_ch01_002-039.indd 4 11/10/13 4:05 PM11/10/13 4:05 PM

Final PDF to printer

Chapter One Introduction to Operations Management 5

The creation of goods or services involves transforming or converting inputs into outputs. Various inputs such as capital, labor, and information are used to create goods or services using one or more transformation processes (e.g., storing, transporting, repairing). To ensure that the desired outputs are obtained, an organization takes measurements at various points in the transformation process ( feedback ) and then compares them with previously established standards to determine whether corrective action is needed ( control ). Figure 1.4 depicts the conversion system.

Table  1.1 provides some examples of inputs, transformation processes, and outputs. Although goods and services are listed separately in Table 1.1 , it is important to note that

FIGURE 1.3 A supply chain for bread

Supermarket

Bakery

Mill

Farm

Bread $1.29

Suppliers:

Trucking

Trucking

Trucking

Equipment suppliers Equipment repair Feed, seed, fertilizers, pesticides Energy/fuel

Suppliers:

Equipment suppliers Equipment repair Other ingredients Energy

Suppliers:

Equipment suppliers Equipment repair Energy

Suppliers:

Fuel Repairs Tires Drivers Trucks

FIGURE 1.4 The operations function involves the conversion of inputs into outputs

Value-added

Control

Inputs Land Labor Capital Information

Outputs Goods Services

Transformation/ conversion process

Measurement and Feedback

Measurement and Feedback

Measurement and Feedback

ste24102_ch01_002-039.indd 5ste24102_ch01_002-039.indd 5 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

6 Chapter One Introduction to Operations Management

FIGURE 1.5 The goods–service continuum

Goods Service

Songwriting, software development

Computer repair, restaurant meal

Automobile repair, fast food

Home remodeling, retail sales

Automobile assembly, steelmaking

Surgery, teaching

TABLE 1.1 Examples of inputs, transformation, and outputs

Inputs Transformation Outputs

Land Processes High goods percentage Human Cutting, drilling Houses Physical labor Transporting Automobiles Intellectual labor Teaching Clothing Capital Farming Computers Raw materials Mixing Machines Water Packing Televisions Metals Copying, faxing Food products Wood Analyzing Textbooks Equipment Developing CD players Machines Searching High service percentage Computers Researching Health care Trucks Repairing Entertainment Tools Innovating Car repair Facilities Debugging Legal Hospitals Selling Banking Factories Communication Retail stores Energy Other Information Time Legal constraints Government regulations

goods and services often occur jointly. For example, having the oil changed in your car is a service, but the oil that is delivered is a good. Similarly, house painting is a service, but the paint is a good. The goods–service combination is a continuum. It can range from primar- ily goods, with little service, to primarily service, with few goods. Figure 1.5 illustrates this continuum. Because there are relatively few pure goods or pure services, companies usually sell product packages, which are a combination of goods and services. There are elements of both goods production and service delivery in these product packages. This makes managing operations more interesting, and also more challenging.

ste24102_ch01_002-039.indd 6ste24102_ch01_002-039.indd 6 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

Chapter One Introduction to Operations Management 7

Table 1.2 provides some specific illustrations of the transformation process. The essence of the operations function is to add value during the transformation process:

Value-added is the term used to describe the difference between the cost of inputs and the value or price of outputs. In nonprofit organizations, the value of outputs (e.g., highway con- struction, police and fire protection) is their value to society; the greater the value-added, the greater the effectiveness of these operations. In for-profit organizations, the value of outputs is measured by the prices that customers are willing to pay for those goods or services. Firms use the money generated by value-added for research and development, investment in new facilities and equipment, worker salaries, and profits. Consequently, the greater the value- added, the greater the amount of funds available for these purposes. Value can also be psycho- logical, as in branding.

Many factors affect the design and management of operations systems. Among them are the degree of involvement of customers in the process and the degree to which technology is used to produce and/or deliver a product or service. The greater the degree of customer involvement, the more challenging it can be to design and manage the operation. Technology choices can have a major impact on productivity, costs, flexibility, and quality and customer satisfaction.

1.2 PRODUCTION OF GOODS VERSUS PROVIDING SERVICES

Although goods and services often go hand in hand, there are some very basic differences between the two, differences that impact the management of the goods portion versus man- agement of the service portion. There are also many similarities between the two.

Production of goods results in a tangible output, such as an automobile, eyeglasses, a golf ball, a refrigerator—anything that we can see or touch. It may take place in a factory, but it can occur elsewhere. For example, farming and restaurants produce nonmanufactured goods. Delivery of service, on the other hand, generally implies an act. A physician’s exami- nation, TV and auto repair, lawn care, and the projection of a film in a theater are examples of services. The majority of service jobs fall into these categories:

Professional services (e.g., financial, health care, legal).

Mass services (e.g., utilities, Internet, communications).

Service shops (e.g., tailoring, appliance repair, car wash, auto repair/maintenance).

Personal care (e.g., beauty salon, spa, barbershop).

Value-added  The difference between the cost of inputs and the value or price of outputs.

LO1.2 Identify the similarities and differences between pro- duction and service operations.

TABLE 1.2 Illustrations of the transformation process

Inputs Processing Output

Food Processor Raw vegetables Cleaning Canned vegetables Metal sheets Making cans Water Cutting Energy Cooking Labor Packing Building Labeling Equipment

Hospital Doctors, nurses Examination Treated patients Hospital Surgery Medical supplies Monitoring Equipment Medication Laboratories Therapy

ste24102_ch01_002-039.indd 7ste24102_ch01_002-039.indd 7 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

8 Chapter One Introduction to Operations Management

Government (e.g., Medicare, mail, social services, police, fire).

Education (e.g., schools, universities).

Food service (e.g., catering).

Services within organizations (e.g., payroll, accounting, maintenance, IT, HR, janitorial).

Retailing and wholesaling.

Shipping and delivery (e.g., truck, railroad, boat, air).

Residential services (e.g., lawn care, painting, general repair, remodeling, interior design).

Transportation (e.g., mass transit, taxi, airlines, ambulance).

Travel and hospitality (e.g., travel bureaus, hotels, resorts).

Miscellaneous services (e.g., copy service, temporary help).

Manufacturing and service are often different in terms of what is done but quite similar in terms of how it is done.

Consider these points of comparison:

Degree of customer contact. Many services involve a high degree of customer con- tact, although services such as Internet providers, utilities, and mail service do not. When there is a high degree of contact, the interaction between server and customer becomes a “moment of truth” that will be judged by the customer every time the ser- vice occurs.

Labor content of jobs. Services often have a higher degree of labor content than manu- facturing jobs do, although automated services are an exception.

Uniformity of inputs. Service operations are often subject to a higher degree of vari- ability of inputs. Each client, patient, customer, repair job, and so on presents a some- what unique situation that requires assessment and flexibility. Conversely, manufacturing operations often have a greater ability to control the variability of inputs, which leads to more-uniform job requirements.

Measurement of productivity. Measurement of productivity can be more difficult for service jobs due largely to the high variations of inputs. Thus, one doctor might have a higher level of routine cases to deal with, while another might have more-difficult cases. Unless a careful analysis is conducted, it may appear that the doctor with the difficult cases has a much lower productivity than the one with the routine cases.

Quality assurance. Quality assurance is usually more challenging for services due to the higher variation in input, and because delivery and consumption occur at the same time. Unlike manufacturing, which typically occurs away from the customer and allows mis- takes that are identified to be corrected, services have less opportunity to avoid exposing the customer to mistakes.

Inventory. Many services tend to involve less use of inven- tory than manufacturing operations, so the costs of having inventory on hand are lower than they are for manufactur- ing. However, unlike manufactured goods, services cannot be stored. Instead, they must be provided “on demand.”

Wages. Manufacturing jobs are often well paid, and have less wage variation than service jobs, which can range from highly paid professional services to minimum-wage workers.

Ability to patent. Product designs are often easier to patent than service designs, and some services cannot be patented, making them easier for competitors to copy.

There are also many similarities between managing the pro- duction of products and managing services. In fact, most of the

ste24102_ch01_002-039.indd 8ste24102_ch01_002-039.indd 8 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

Chapter One Introduction to Operations Management 9

topics in this book pertain to both. When there are important service considerations, these are highlighted in separate sections. Here are some of the primary factors for both:

a. Forecasting and capacity planning to match supply and demand.

b. Process management.

c. Managing variations.

d. Monitoring and controlling costs and productivity.

e. Supply chain management.

f. Location planning, inventory management, quality control, and scheduling.

Note that many service activities are essential in goods-producing companies. These include training, human resource management, customer service, equipment repair, procurement, and administrative services.

Table 1.3 provides an overview of the differences between production of goods and service operations. Remember, though, that most systems involve a blend of goods and services.

1.3 WHY LEARN ABOUT OPERATIONS MANAGEMENT?

Whether operations management is your major or not, the skill set you gain studying opera- tions management will serve you well in your career.

There are many career-related reasons for wanting to learn about operations management, whether you plan to work in the field of operations or not. This is because every aspect of business affects or is affected by operations. Operations and sales are the two line functions in a business organization. All other functions—accounting, finance, marketing, IT, and so on—support the two line functions. Among the service jobs that are closely related to opera- tions are financial services (e.g., stock market analyst, broker, investment banker, and loan officer), marketing services (e.g., market analyst, marketing researcher, advertising manager, and product manager), accounting services (e.g., corporate accountant, public accountant, and budget analyst), and information services (e.g., corporate intelligence, library services, man- agement information systems design services).

A common complaint from employers is that college graduates come to them very focused, when employers would prefer them to have more of a general knowledge of how business organizations operate. This book provides some of the breadth that employers are looking for in their new hires. Apart from the career-related reasons is a not so obvious one: Through learning about operations and supply chains, you will have a much better understanding of the world you live in, the global dependencies of companies and nations, some of the reasons that companies succeed or fail, and the importance of working with others.

LO1.3 Explain the importance of learning about operations management.

TABLE 1.3 Typical differences between production of goods and provision of services

Characteristic Goods Services

Output Tangible Intangible Customer contact Low High Labor content Low High Uniformity of input High Low Measurement of productivity Easy Difficult Opportunity to correct problems

before delivery High Low Inventory Much Little Wages Narrow range Wide range Patentable Usually Not usually

ste24102_ch01_002-039.indd 9ste24102_ch01_002-039.indd 9 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

10 Chapter One Introduction to Operations Management

Working together successfully means that all members of the organization understand not only their own role, but they also understand the roles of others. In practice, there is signifi- cant interfacing and collaboration among the various functional areas, involving exchange of information and cooperative decision making. For example, although the three primary func- tions in business organizations perform different activities, many of their decisions impact the other areas of the organization. Consequently, these functions have numerous interactions, as depicted by the overlapping circles shown in Figure 1.6 .

Finance and operations management personnel cooperate by exchanging information and expertise in such activities as the following:

1. Budgeting. Budgets must be periodically prepared to plan financial requirements. Budgets must sometimes be adjusted, and performance relative to a budget must be evaluated.

2. Economic analysis of investment proposals. Evaluation of alternative investments in plant and equipment requires inputs from both operations and finance people.

3. Provision of funds. The necessary funding of operations and the amount and timing of funding can be important and even critical when funds are tight. Careful planning can help avoid cash-flow problems.

Marketing’s focus is on selling and/or promoting the goods or services of an organization. Marketing is also responsible for assessing customer wants and needs, and for communicat- ing those to operations people (short term) and to design people (long term). That is, opera- tions needs information about demand over the short to intermediate term so that it can plan accordingly (e.g., purchase materials or schedule work), while design people need informa- tion that relates to improving current products and services and designing new ones. Market- ing, design, and production must work closely together to successfully implement design changes and to develop and produce new products. Marketing can provide valuable insight on what competitors are doing. Marketing also can supply information on consumer prefer- ences so that design will know the kinds of products and features needed; operations can supply information about capacities and judge the manufacturability of designs. Operations will also have advance warning if new equipment or skills will be needed for new products or services. Finance people should be included in these exchanges in order to provide informa- tion on what funds might be available (short term) and to learn what funds might be needed for new products or services (intermediate to long term). One important piece of information marketing needs from operations is the manufacturing or service lead time in order to give customers realistic estimates of how long it will take to fill their orders.

Thus, marketing, operations, and finance must interface on product and process design, forecasting, setting realistic schedules, quality and quantity decisions, and keeping each other informed on the other’s strengths and weaknesses.

People in every area of business need to appreciate the importance of managing and coor- dinating operations decisions that affect the supply chain and the matching of supply and demand, and how those decisions impact other functions in an organization.

LO1.4 Identify the three major functional areas of organiza- tions and describe how they interrelate.

Lead time  The time between ordering a good or service and receiving it.

FIGURE 1.6 The three major functions of business organizations overlap

Marketing and Sales

Operations

Finance

ste24102_ch01_002-039.indd 10ste24102_ch01_002-039.indd 10 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

Chapter One Introduction to Operations Management 11

Operations also interacts with other functional areas of the organization, including legal, management information systems (MIS), accounting, personnel/human resources, and public relations, as depicted in Figure 1.7 .

The legal department must be consulted on contracts with employees, customers, suppli- ers, and transporters, as well as on liability and environmental issues.

Accounting supplies information to management on costs of labor, materials, and over- head, and may provide reports on items such as scrap, downtime, and inventories.

Management information systems (MIS) is concerned with providing management with the information it needs to effectively manage. This occurs mainly through designing systems to capture relevant information and designing reports. MIS is also important for managing the control and decision-making tools used in operations management.

The personnel or human resources department is concerned with recruitment and training of personnel, labor relations, contract negotiations, wage and salary administration, assisting in manpower projections, and ensuring the health and safety of employees.

Public relations has responsibility for building and maintaining a positive public image of the organization. Good public relations provides many potential benefits. An obvious one is in the marketplace. Other potential benefits include public awareness of the organization as a good place to work (labor supply), improved chances of approval of zoning change requests, community acceptance of expansion plans, and instilling a positive attitude among employees.

1.4 CAREER OPPORTUNITIES AND PROFESSIONAL SOCIETIES

There are many career opportunities in the operations management and supply chain fields. Among the numerous job titles are operations manager, production analyst, production man- ager, inventory manager, purchasing manager, schedule coordinator, distribution manager, supply chain manager, quality analyst, and quality manager. Other titles include office man- ager, store manager, and service manager.

People who work in the operations field should have a skill set that includes both peo- ple skills and knowledge skills. People skills include political awareness; mentoring abil- ity; and collaboration, negotiation, and communication skills. Knowledge skills, necessary for credibility and good decision making, include product and/or service knowledge, process knowledge, industry and global knowledge, financial and accounting skills, and project man- agement skills. See Table 1.4 .

If you are thinking of a career in operations management, you can benefit by joining one or more of the professional societies.

FIGURE 1.7 Operations interfaces with a number of supporting functions

Legal Public relations

Personnel/ Human

resources Accounting

Operations

MIS

ste24102_ch01_002-039.indd 11ste24102_ch01_002-039.indd 11 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

12 Chapter One Introduction to Operations Management

APICS, the Association for Operations Management 8430 West Bryn Mawr Avenue, Suite 1000, Chicago, Illinois 60631 www.apics.org

American Society for Quality (ASQ) 230 West Wells Street, Milwaukee, Wisconsin 53203 www.asq.org

Institute for Supply Management (ISM) 2055 East Centennial Circle, Tempe, Arizona 85284 www.ism.ws

Institute for Operations Research and the Management Sciences (INFORMS) 901 Elkridge Landing Road, Linthicum, Maryland 21090-2909 www.informs.org

The Production and Operations Management Society (POMS) College of Engineering, Florida International University, EAS 2460, 10555 West Flagler Street, Miami, Florida 33174 www.poms.org

The Project Management Institute (PMI) 4 Campus Boulevard, Newtown Square, Pennsylvania 19073-3299 www.pmi.org

Council of Supply Chain Management Professionals (CSCMP) 333 East Butterfield Road, Suite 140, Lombard, Illinois 60148 http//cscmp.org

APICS, ASQ, ISM, and other professional societies offer a practitioner certification examination that can enhance your qualifications. Information about job opportunities can be obtained from all of these societies as well as from other sources, such as the Decision Sciences Institute (University Plaza, Atlanta, Georgia 30303) and the Institute of Industrial Engineers (25 Technology Park, Norcross, Georgia 30092).

1.5 PROCESS MANAGEMENT A key aspect of operations management is process management. A process consists of one or more actions that transform inputs into outputs. In essence, the central role of all management is process management.

Businesses are composed of many interrelated processes. Generally speaking, there are three categories of business processes:

1. Upper-management processes. These govern the operation of the entire organization. Examples include organizational governance and organizational strategy.

2. Operational processes. These are the core processes that make up the value stream. Examples include purchasing, production and/or service, marketing, and sales.

3. Supporting processes. These support the core processes. Examples include accounting, human resources, and IT (information technology).

Process  One or more actions that transform inputs into outputs.

TABLE 1.4 Sample operations management job descriptions Production Supervisor Supply Chain Manager

Social Media Product Manager

• Manage a production staff of 10–20.

• Ensure the department meets daily goals through the management of productivity.

• Enforce safety policies. • Coordinate work between

departments. • Have good problem-solving

skills, and good written and oral communication skills.

• Have a general knowledge of materials management, information systems, and basic statistics.

• Direct, monitor, evaluate, and motivate employee performance.

• Be knowledgeable about shipping regulations.

• Manage budgetary accounts • Manage projects.

• Identify ways to increase consumer engagement.

• Analyze the key performance indica- tors and recommend improvements.

• Lead cross-functional teams to define product specifications.

• Collaborate with design and technical to create key product improvements.

• Develop requirements for new Web site enhancements.

• Monitor the competition to identify need for changes.

ste24102_ch01_002-039.indd 12ste24102_ch01_002-039.indd 12 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

Chapter One Introduction to Operations Management 13

Business processes, large and small, are composed of a series of supplier–customer rela- tionships, where every business organization, every department, and every individual opera- tion is both a customer of the previous step in the process and a supplier to the next step in the process. Figure 1.8 illustrates this concept.

A major process can consist of many subprocesses, each having its own goals that con- tribute to the goals of the overall process. Business organizations and supply chains have many such processes and subprocesses, and they benefit greatly when management is using a process perspective. Business process management (BPM) activities include process design, process execution, and process monitoring. Two basic aspects of this for operations and sup- ply chain management are managing processes to meet demand and dealing with process variability.

Managing a Process to Meet Demand Ideally, the capacity of a process will be such that its output just matches demand. Excess capacity is wasteful and costly; too little capacity means dissatisfied customers and lost rev- enue. Having the right capacity requires having accurate forecasts of demand, the ability to translate forecasts into capacity requirements, and a process in place capable of meeting expected demand. Even so, process variation and demand variability can make the achieve- ment of a match between process output and demand difficult. Therefore, to be effective, it is also necessary for managers to be able to deal with variation.

Process Variation Variation occurs in all business processes. It can be due to variety or variability. For example, random variability is inherent in every process; it is always present. In addition, variation can occur as the result of deliberate management choices to offer customers variety.

There are four basic sources of variation:

1. The variety of goods or services being offered. The greater the variety of goods and services, the greater the variation in production or service requirements.

2. Structural variation in demand. These variations, which include trends and sea- sonal variations, are generally predictable. They are particularly important for capacity planning.

3. Random variation. This natural variability is present to some extent in all processes, as well as in demand for services and products, and it cannot generally be influenced by managers.

4. Assignable variation. These variations are caused by defective inputs, incorrect work methods, out-of-adjustment equipment, and so on. This type of variation can be reduced or eliminated by analysis and corrective action.

Variations can be disruptive to operations and supply chain processes, interfering with optimal functioning. Variations result in additional cost, delays and shortages, poor quality, and inefficient work systems. Poor quality and product shortages or service delays can lead to dissatisfied customers and can damage an organization’s reputation and image. It is not surprising, then, that the ability to deal with variability is absolutely necessary for managers.

Throughout this book, you will learn about some of the tools managers use to deal with variation. An important aspect of being able to deal with variation is to use metrics to describe it. Two widely used metrics are the mean (average) and the standard deviation. The stan- dard deviation quantifies variation around the mean. The mean and standard deviation are used throughout this book in conjunction with variation. So, too, is the normal distribution.

LO1.5 Summarize the two major aspects of process management.

FIGURE 1.8 Business processes form a sequence of suppliers and customers

Supplier(s) Customer(s)

A business organization, a

department, or an individual operation

Input(s) from one or more suppliers

Output(s) to one or more customers

Transformation

ste24102_ch01_002-039.indd 13ste24102_ch01_002-039.indd 13 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

14 Chapter One Introduction to Operations Management

Because you will come across many examples of how the normal distribution is used, you may find the overview on working with the normal distribution in the appendix at the end of the book helpful.

1.6 THE SCOPE OF OPERATIONS MANAGEMENT

The scope of operations management ranges across the organization. Operations management people are involved in product and service design, process selection, selection and manage- ment of technology, design of work systems, location planning, facilities planning, and qual- ity improvement of the organization’s products or services.

The operations function includes many interrelated activities, such as forecasting, capacity planning, scheduling, managing inventories, assuring quality, motivating employees, deciding where to locate facilities, and more.

We can use an airline company to illustrate a service organization’s operations system. The system consists of the airplanes, airport facilities, and maintenance facilities, sometimes spread out over a wide territory. The activities include:

Forecasting such things as weather and landing conditions, seat demand for flights, and the growth in air travel.

Capacity planning, essential for the airline to maintain cash flow and make a reasonable profit. (Too few or too many planes, or even the right number of planes but in the wrong places, will hurt profits.)

Locating facilities according to managers’ decisions on which cities to provide ser- vice for, where to locate maintenance facilities, and where to locate major and minor hubs.

Facilities and layout, important in achieving effective use of workers and equipment.

LO1.6 Describe the operations function and the nature of the operations manager’s job.

Scheduling planes, cargo, and flight and ground crews is an operations function for an airline.

ste24102_ch01_002-039.indd 14ste24102_ch01_002-039.indd 14 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

Chapter One Introduction to Operations Management 15

Scheduling of planes for flights and for routine maintenance; scheduling of pilots and flight attendants; and scheduling of ground crews, counter staff, and baggage handlers.

Managing inventories of such items as foods and beverages, first-aid equipment, in- flight magazines, pillows and blankets, and life preservers.

Assuring quality, essential in flying and maintenance operations, where the emphasis is on safety, and important in dealing with customers at ticket counters, check-in, telephone and electronic reservations, and curb service, where the emphasis is on efficiency and courtesy.

Motivating and training employees in all phases of operations.

Managing the Supply Chain to Achieve Schedule, Cost, and Quality Goals Now consider a bicycle factory. This might be primarily an assembly operation: buying com- ponents such as frames, tires, wheels, gears, and other items from suppliers, and then assem- bling bicycles. The factory also might do some of the fabrication work itself, forming frames, making the gears and chains, and it might buy mainly raw materials and a few parts and materials such as paint, nuts and bolts, and tires. Among the key management tasks in either case are scheduling production, deciding which components to make and which to buy, order- ing parts and materials, deciding on the style of bicycle to produce and how many, purchasing new equipment to replace old or worn-out equipment, maintaining equipment, motivating workers, and ensuring that quality standards are met.

Obviously, an airline company and a bicycle factory are completely different types of operations. One is primarily a service operation, the other a producer of goods. Nonetheless, these two operations have much in common. Both involve scheduling activities, motivating employees, ordering and managing supplies, selecting and maintaining equipment, satisfying quality standards, and—above all—satisfying customers. And in both businesses, the success of the business depends on short- and long-term planning.

A primary function of an operations manager is to guide the system by decision mak- ing. Certain decisions affect the design of the system, and others affect the operation of the system.

A worker is making the bottom bracket lug for a Trek OCLV carbon road bike at Trek Bicycle Company in Waterloo, Wisconsin, world headquarters for Trek. Trek is a world leader in bicycle products and accessories, with 1,500 employees worldwide. Designers and engineers incorporate the most advanced technology into Trek products, resulting in award-winning bikes and components.

ste24102_ch01_002-039.indd 15ste24102_ch01_002-039.indd 15 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

16 Chapter One Introduction to Operations Management

System design involves decisions that relate to system capacity, the geographic loca- tion of facilities, arrangement of departments and placement of equipment within physical structures, product and service planning, and acquisition of equipment. These decisions usually, but not always, require long-term commitments. Moreover, they are typically strategic decisions. System operation involves management of personnel, inventory plan- ning and control, scheduling, project management, and quality assurance. These are generally tactical and operational decisions. Feedback on these decisions involves mea- surement and control. In many instances, the operations manager is more involved in day-to-day operating decisions than with decisions relating to system design. However, the operations manager has a vital stake in system design because system design essen- tially determines many of the parameters of system operation. For example, costs, space, capacities, and quality are directly affected by design decisions. Even though the opera- tions manager is not responsible for making all design decisions, he or she can provide those decision makers with a wide range of information that will have a bearing on their decisions.

A number of other areas are part of, or support, the operations function. They include pur- chasing, industrial engineering, distribution, and maintenance.

Purchasing has responsibility for procurement of materials, supplies, and equipment. Close contact with operations is necessary to ensure correct quantities and timing of purchases. The purchasing department is often called on to evaluate vendors for quality, reliability, service, price, and ability to adjust to changing demand. Purchasing is also involved in receiving and inspecting the purchased goods.

Industrial engineering is often concerned with scheduling, performance standards, work methods, quality control, and material handling.

Distribution involves the shipping of goods to warehouses, retail outlets, or final customers.

Maintenance is responsible for general upkeep and repair of equipment, buildings and grounds, heating and air-conditioning; removing toxic wastes; parking; and perhaps security.

The operations manager is the key figure in the system: He or she has the ultimate responsibil- ity for the creation of goods or provision of services.

The kinds of jobs that operations managers oversee vary tremendously from organization to organization largely because of the different products or services involved. Thus, manag- ing a banking operation obviously requires a different kind of expertise than managing a steelmaking operation. However, in a very important respect, the jobs are the same: They are both essentially managerial. The same thing can be said for the job of any operations manager regardless of the kinds of goods or services being created.

The service sector and the manufacturing sector are both important to the economy. The service sector now accounts for more than 70 percent of jobs in the United States, and it is growing in other countries as well. Moreover, the number of people working in services is increasing, while the number of people working in manufacturing is not. The reason for the decline in manufacturing jobs is twofold: As the operations function in manufacturing com- panies finds more productive ways of producing goods, the companies are able to maintain or even increase their output using fewer workers. Furthermore, some manufacturing work has been outsourced to more productive companies, many in other countries, that are able to produce goods at lower costs. Outsourcing and productivity will be discussed in more detail in this and other chapters.

Many of the concepts presented in this book apply equally to manufacturing and service. Consequently, whether your interest at this time is on manufacturing or on service, these con- cepts will be important, regardless of whether a manufacturing example or service example is used to illustrate the concept.

The reading on page 17 gives another reason for the importance of manufacturing jobs.

ste24102_ch01_002-039.indd 16ste24102_ch01_002-039.indd 16 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

17

Why Manufacturing Matters READING

The U.S. economy is becoming more and more service-based. The per- centage of employment in manufacturing continues to decrease while the percentage employed in services continues to increase. However, it would be unwise to assume that manufacturing isn’t important to the economy, or that service is more important. Let’s see why.

Not only is the percentage of manufacturing jobs decreasing, but the actual number of manufacturing jobs is also decreasing. There are two main reasons for the decline: increases in productivity, which means fewer workers are needed to maintain manufacturing output; and outsourcing, especially to countries that have much lower wages, an attractive option for companies seeking to maintain their competi- tiveness and boost their bottom lines.

However, when companies outsource part (or in some cases, all) of their manufacturing to lower-cost countries, the loss of jobs results in the loss of service jobs as well. Some are lost in the community in retail businesses patronized by the manufacturing workers. Also included in that figure are factory service workers (e.g., workers who do machine repairs, maintenance, material handling, packaging, and so on). General estimates are that four service jobs are lost for each manufacturing job lost.

As the manufacturing base shrinks, workers who lose their manu- facturing job are finding it tougher to find another opening in manufac- turing. Instead they join the ranks of the unemployed, or take a service job, usually at a lower wage rate than what manufacturing paid.

From a national perspective, not only is work transferred to a foreign country, intellectual knowl- edge is transferred. Moreover, as time passes, the domestic base of manufacturing skills and know-how is lost.

There are important consequences for taxes as well. Unemploy- ment benefits are costly, and the erosion of federal, state, and local tax bases results in lower tax revenues collected from individuals and from corporations.

Lastly, manufacturing is an important source of innovation. It is responsible for 70 percent of private-sector R&D and 90 percent of U.S. patents (Rana Foroohar, “Go Glocal,” Time, August 20, 2012, p. 30). Much of the work in getting a product ready for volume production is high-value- added knowledge work that supports future innovation. And innovation generates jobs. “Intel has invested tens of billions of dollars in its facto- ries in Oregon, Arizona, and New Mexico so that they are able to produce the most advanced semiconductors” (Willy Shih and Gary Pisano,“Why Manufacturing Matters for America,” Special to CNN, Sept. 21, 2012).

Questions

1. How important is the loss of manufacturing jobs to the nation? 2. Can you suggest some actions the government (federal, state, or

local) can take to stem the job loss? 3. What evidence is there of the importance of manufacturing

innovation?

1.7 OPERATIONS MANAGEMENT AND DECISION MAKING

The chief role of an operations manager is that of planner/decision maker. In this capacity, the operations manager exerts considerable influence over the degree to which the goals and objectives of the organization are realized. Most decisions involve many possible alternatives that can have quite different impacts on costs or profits. Consequently, it is important to make informed decisions.

Operations management professionals make a number of key decisions that affect the entire organization. These include the following:

What: What resources will be needed, and in what amounts?

When: When will each resource be needed? When should the work be scheduled? When should materials and other supplies be ordered? When is corrective action needed?

Where: Where will the work be done?

How: How will the product or service be designed? How will the work be done (organi- zation, methods, equipment)? How will resources be allocated?

Who: Who will do the work?

An operations manager’s daily concerns include costs (budget), quality, and schedules (time). Throughout this book, you will encounter the broad range of decisions that operations

managers must make, and you will be introduced to the tools necessary to handle those deci- sions. This section describes general approaches to decision making, including the use of

LO1.7 Explain the key aspects of operations management decision making.

rk l- k

ste24102_ch01_002-039.indd 17ste24102_ch01_002-039.indd 17 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

18 Chapter One Introduction to Operations Management

models, quantitative methods, analysis of trade-offs, establishing priorities, ethics, and the systems approach. Models are often a key tool used by all decision makers.

Models A model is an abstraction of reality, a simplified representation of something. For example, a child’s toy car is a model of a real automobile. It has many of the same visual features (shape, relative proportions, wheels) that make it suitable for the child’s learning and play- ing. But the toy does not have a real engine, it cannot transport people, and it does not weigh 2,000 pounds.

Other examples of models include automobile test tracks and crash tests; formulas, graphs and charts; balance sheets and income statements; and financial ratios. Common statistical models include descriptive statistics such as the mean, median, mode, range, and standard deviation, as well as random sampling, the normal distribution, and regression equations.

Models are sometimes classified as physical, schematic, or mathematical:

Physical models look like their real-life counterparts. Examples include miniature cars, trucks, airplanes, toy animals and trains, and scale-model buildings. The advantage of these models is their visual correspondence with reality.

Schematic models are more abstract than their physical counterparts; that is, they have less resemblance to the physical reality. Examples include graphs and charts, blue- prints, pictures, and drawings. The advantage of schematic models is that they are often relatively simple to construct and change. Moreover, they have some degree of visual correspondence.

Mathematical models are the most abstract: They do not look at all like their real-life counterparts. Examples include numbers, formulas, and symbols. These models are usually the easiest to manipulate, and they are important forms of inputs for computers and calculators.

The variety of models in use is enormous. Nonetheless, all have certain common features: They are all decision-making aids and simplifications of more complex real-life phenomena. Real life involves an overwhelming amount of detail, much of which is irrelevant for any par- ticular problem. Models omit unimportant details so that attention can be concentrated on the most important aspects of a situation.

Because models play a significant role in operations management decision making, they are heavily integrated into the material of this text. For each model, try to learn (1) its pur- pose, (2) how it is used to generate results, (3) how these results are interpreted and used, and (4) what assumptions and limitations apply.

The last point is particularly important because virtually every model has an associated set of assumptions or conditions under which the model is valid. Failure to satisfy all of the assumptions will make the results suspect. Attempts to apply the results to a problem under such circumstances can lead to disastrous consequences.

Managers use models in a variety of ways and for a variety of reasons. Models are benefi- cial because they

1. Are generally easy to use and less expensive than dealing directly with the actual situation.

2. Require users to organize and sometimes quantify information and, in the process, often indicate areas where additional information is needed.

3. Increase understanding of the problem.

4. Enable managers to analyze what-if questions.

5. Serve as a consistent tool for evaluation and provide a standardized format for analyzing a problem.

6. Enable users to bring the power of mathematics to bear on a problem.

Model  An abstraction of reality; a simplified representation of something.

ste24102_ch01_002-039.indd 18ste24102_ch01_002-039.indd 18 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

Chapter One Introduction to Operations Management 19

This impressive list of benefits notwithstanding, models have certain limitations of which you should be aware. The following are three of the more important limitations:

1. Quantitative information may be emphasized at the expense of qualitative information.

2. Models may be incorrectly applied and the results misinterpreted. The widespread use of computerized models adds to this risk because highly sophisticated models may be placed in the hands of users who are not sufficiently knowledgeable to appreciate the subtleties of a particular model; thus, they are unable to fully comprehend the circum- stances under which the model can be successfully employed.

3. The use of models does not guarantee good decisions.

Quantitative Approaches Quantitative approaches to problem solving often embody an attempt to obtain mathemati- cally optimal solutions to managerial problems. Linear programming and related math- ematical techniques are widely used for optimum allocation of scarce resources. Queuing techniques are useful for analyzing situations in which waiting lines form. Inventory models are widely used to control inventories. Project models such as PERT (program evaluation and review technique) and CPM (critical path method) are useful for planning, coordinating, and controlling large-scale projects. Forecasting techniques are widely used in planning and scheduling. Statistical models are currently used in many areas of decision making.

In large measure, quantitative approaches to decision making in operations management (and in other functional business areas) have been accepted because of calculators and com- puters capable of handling the required calculations. Computers have had a major impact on operations management. Moreover, the growing availability of software packages for quanti- tative techniques has greatly increased management’s use of those techniques.

Although quantitative approaches are widely used in operations management decision making, it is important to note that managers typically use a combination of qualitative and quantitative approaches, and many important decisions are based on qualitative approaches.

Performance Metrics All managers use metrics to manage and control operations. There are many metrics in use, including those related to profits, costs, quality, productivity, flexibility, assets, inventories, schedules, and forecast accuracy. As you read each chapter, note the metrics being used and how they are applied to manage operations.

Analysis of Trade-Offs Operations personnel frequently encounter decisions that can be described as trade-off deci- sions. For example, in deciding on the amount of inventory to stock, the decision maker must take into account the trade-off between the increased level of customer service that the addi- tional inventory would yield and the increased costs required to stock that inventory.

Throughout this book you will be presented with decision models that reflect these kinds of trade-offs. Decision makers sometimes deal with these decisions by listing the advantages and disadvantages—the pros and cons—of a course of action to better understand the conse- quences of the decisions they must make. In some instances, decision makers add weights to the items on their list that reflect the relative importance of various factors. This can help them “net out” the potential impacts of the trade-offs on their decision.

Degree of Customization A major influence on the entire organization is the degree of customization of products or ser- vices being offered to its customers. Providing highly customized products or services such as home remodeling, plastic surgery, and legal counseling tends to be more labor intensive than providing standardized products such as those you would buy “off the shelf” at a mall store

ste24102_ch01_002-039.indd 19ste24102_ch01_002-039.indd 19 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

20

or a supermarket or standardized services such as public utilities and Internet services. Fur- thermore, production of customized products or provision of customized services is generally more time consuming, requires more highly skilled people, and involves more flexible equip- ment than what is needed for standardized products or services. Customized processes tend to have a much lower volume of output than standardized processes, and customized output carries a higher price tag. The degree of customization has important implications for process selection and job requirements. The impact goes beyond operations and supply chains. It affects marketing, sales, accounting, finance, and information systems.

A Systems Approach A systems viewpoint is almost always beneficial in decision making. Think of it as a “big pic- ture” view. A system can be defined as a set of interrelated parts that must work together. In a business organization, the organization can be thought of as a system composed of subsystems (e.g., marketing subsystem, operations subsystem, finance subsystem), which in turn are com- posed of lower subsystems. The systems approach emphasizes interrelationships among sub- systems, but its main theme is that the whole is greater than the sum of its individual parts. Hence, from a systems viewpoint, the output and objectives of the organization as a whole take precedence over those of any one subsystem. An alternative approach is to concentrate on efficiency within subsystems and thereby achieve overall efficiency. But that approach overlooks the facts that organizations must operate in an environment of scarce resources and that subsystems are often in direct competition for those scarce resources, so that an orderly approach to the allocation of resources is called for.

A systems approach is essential whenever something is being designed, redesigned, imple- mented, improved, or otherwise changed. It is important to take into account the impact on all parts of the system. For example, if the upcoming model of an automobile will add antilock brakes, a designer must take into account how customers will view the change, instructions for using the brakes, chances for misuse, the cost of producing the new brakes, installation procedures, recycling worn-out brakes, and repair procedures. In addition, workers will need training to make and/or assemble the brakes, production scheduling may change, inventory procedures may have to change, quality standards will have to be established, advertising must be informed of the new features, and parts suppliers must be selected.

Establishing Priorities In virtually every situation, managers discover that certain issues or items are more important than others. Recognizing this enables the managers to direct their efforts to where they will do the most good.

Typically, a relatively few issues or items are very important, so that dealing with those factors will generally have a disproportionately large impact on the results achieved. This well-known effect is referred to as the Pareto phenomenon . This is one of the most impor- tant and pervasive concepts in operations management. In fact, this concept can be applied at all levels of management and to every aspect of decision making, both professional and personal.

System  A set of interrelated parts that must work together.

Pareto phenomenon  A few factors account for a high per- centage of the occurrence of some event(s).

READINGAnalytics

Analytics uses descriptive and predictive models to obtain insight from data and then uses that insight to recommend action or to guide deci- sion making.

Commercial analytics software is available for the challenges of analyzing very large, dynamic data sets, referred to as big data. Analyz- ing big data presents opportunities for businesses such as those that

operate transactional online systems that gener- ate massive volumes of data. For example, the McKinsey Global Institute estimates that the U.S. health care system could save $300 billion from analyzing big data. 1

1“Big Data: The next frontier for innovation, competition and productivity as reported in Building with Big Data” The Economist, May 26, 2011.

ste24102_ch01_002-039.indd 20ste24102_ch01_002-039.indd 20 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

Chapter One Introduction to Operations Management 21

1.8 THE HISTORICAL EVOLUTION OF OPERATIONS MANAGEMENT

Systems for production have existed since ancient times. For example, the construction of pyramids and Roman aquaducts involved operations management skills. The production of goods for sale, at least in the modern sense, and the modern factory system had their roots in the Industrial Revolution.

The Industrial Revolution The Industrial Revolution began in the 1770s in England and spread to the rest of Europe and to the United States during the 19th century. Prior to that time, goods were produced in small shops by craftsmen and their apprentices. Under that system, it was common for one person to be responsible for making a product, such as a horse-drawn wagon or a piece of furniture, from start to finish. Only simple tools were available; the machines in use today had not been invented.

Then, a number of innovations in the 18th century changed the face of production forever by substituting machine power for human power. Perhaps the most significant of these was the steam engine, because it provided a source of power to operate machines in factories. Ample supplies of coal and iron ore provided materials for generating power and making machinery. The new machines, made of iron, were much stronger and more durable than the simple wooden machines they replaced.

In the earliest days of manufacturing, goods were produced using craft production: highly skilled workers using simple, flexible tools produced goods according to customer specifications.

Craft production had major shortcomings. Because products were made by skilled crafts- men who custom-fitted parts, production was slow and costly. And when parts failed, the replacements also had to be custom made, which was also slow and costly. Another shortcom- ing was that production costs did not decrease as volume increased; there were no economies of scale, which would have provided a major incentive for companies to expand. Instead, many small companies emerged, each with its own set of standards.

A major change occurred that gave the Industrial Revolution a boost: the development of standard gauging systems. This greatly reduced the need for custom-made goods. Factories began to spring up and grow rapidly, providing jobs for countless people who were attracted in large numbers from rural areas.

Despite the major changes that were taking place, management theory and practice had not progressed much from early days. What was needed was an enlightened and more systematic approach to management.

Scientific Management The scientific management era brought widespread changes to the management of factories. The movement was spearheaded by the efficiency engineer and inventor Frederick Winslow Taylor, who is often referred to as the father of scientific management. Taylor believed in a “science of management” based on observation, measurement, analysis and improvement of work methods, and economic incentives. He studied work methods in great detail to identify the best method for doing each job. Taylor also believed that management should be respon- sible for planning, carefully selecting and training workers, finding the best way to perform each job, achieving cooperation between management and workers, and separating manage- ment activities from work activities.

Taylor’s methods emphasized maximizing output. They were not always popular with workers, who sometimes thought the methods were used to unfairly increase output without a corresponding increase in compensation. Certainly some companies did abuse workers in their quest for efficiency. Eventually, the public outcry reached the halls of Congress, and hearings were held on the matter. Taylor himself was called to testify in 1911, the same year

LO1.8 Briefly describe the historical evolution of operations management.

Craft production  System in which highly skilled workers use simple, flexible tools to produce small quantities of customized goods.

ste24102_ch01_002-039.indd 21ste24102_ch01_002-039.indd 21 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

22 Chapter One Introduction to Operations Management

in which his classic book, The Principles of Scientific Management, was published. The pub- licity from those hearings actually helped scientific management principles to achieve wide acceptance in industry.

A number of other pioneers also contributed heavily to this movement, including the following:

Frank Gilbreth was an industrial engineer who is often referred to as the father of motion study. He developed principles of motion economy that could be applied to incredibly small portions of a task.

Henry Gantt recognized the value of nonmonetary rewards to motivate workers, and developed a widely used system for scheduling, called Gantt charts.

Harrington Emerson applied Taylor’s ideas to organization structure and encouraged the use of experts to improve organizational efficiency. He testified in a congressional hearing that railroads could save a million dollars a day by applying principles of scien- tific management.

Henry Ford, the great industrialist, employed scientific management techniques in his factories.

During the early part of the 20th century, automobiles were just coming into vogue in the United States. Ford’s Model T was such a success that the company had trouble keeping up with orders for the cars. In an effort to improve the efficiency of operations, Ford adopted the scientific management principles espoused by Frederick Winslow Taylor. He also introduced the moving assembly line, which had a tremendous impact on production methods in many industries.

Among Ford’s many contributions was the introduction of mass production to the auto- motive industry, a system of production in which large volumes of standardized goods are produced by low-skilled or semiskilled workers using highly specialized, and often costly, equipment. Ford was able to do this by taking advantage of a number of important concepts. Perhaps the key concept that launched mass production was interchangeable parts , some- times attributed to Eli Whitney, an American inventor who applied the concept to assembling muskets in the late 1700s. The basis for interchangeable parts was to standardize parts so that any part in a batch of parts would fit any automobile coming down the assembly line. This meant that parts did not have to be custom fitted, as they were in craft production. The standardized parts could also be used for replacement parts. The result was a tremendous

Mass production  System in which low-skilled workers use specialized machinery to pro- duce high volumes of standard- ized goods.

Interchangeable parts  Parts of a product made to such preci- sion that they do not have to be custom fitted.

Row of “Tin Lizzies,” or Model T’s, being manufactured on an early Ford assembly line.

ste24102_ch01_002-039.indd 22ste24102_ch01_002-039.indd 22 11/9/13 12:25 PM11/9/13 12:25 PM

Final PDF to printer

Chapter One Introduction to Operations Management 23

decrease in assembly time and cost. Ford accomplished this by standardizing the gauges used to measure parts during production and by using newly developed processes to produce uni- form parts.

A second concept used by Ford was the division of labor , which Adam Smith wrote about in The Wealth of Nations (1776). Division of labor means that an operation, such as assem- bling an automobile, is divided up into a series of many small tasks, and individual workers are assigned to one of those tasks. Unlike craft production, where each worker was respon- sible for doing many tasks, and thus required skill, with division of labor the tasks were so narrow that virtually no skill was required.

Together, these concepts enabled Ford to tremendously increase the production rate at his factories using readily available inexpensive labor. Both Taylor and Ford were despised by many workers, because they held workers in such low regard, expecting them to perform like robots. This paved the way for the human relations movement.

The Human Relations Movement Whereas the scientific management movement heavily emphasized the technical aspects of work design, the human relations movement emphasized the importance of the human ele- ment in job design. Lillian Gilbreth, a psychologist and the wife of Frank Gilbreth, worked with her husband, focusing on the human factor in work. (The Gilbreths were the subject of a classic film, Cheaper by the Dozen. ) Many of her studies dealt with worker fatigue. In the following decades, there was much emphasis on motivation. Elton Mayo conducted studies at the Hawthorne division of Western Electric. His studies revealed that in addition to the physical and technical aspects of work, worker motivation is critical for improving productiv- ity. Abraham Maslow developed motivational theories, which Frederick Hertzberg refined. Douglas McGregor added Theory X and Theory Y. These theories represented the two ends of the spectrum of how employees view work. Theory X, on the negative end, assumed that workers do not like to work, and have to be controlled—rewarded and punished—to get them to do good work. This attitude was quite common in the automobile industry and in some other industries, until the threat of global competition forced them to rethink that approach. Theory Y, on the other end of the spectrum, assumed that workers enjoy the physical and mental aspects of work and become committed to work. The Theory X approach resulted in an adversarial environment, whereas the Theory Y approach resulted in empowered workers and a more cooperative spirit. William Ouchi added Theory Z, which combined the Japanese approach with such features as lifetime employment, employee problem solving, and con- sensus building, and the traditional Western approach that features short-term employment, specialists, and individual decision making and responsibility.

Decision Models and Management Science The factory movement was accompanied by the development of several quantitative tech- niques. F. W. Harris developed one of the first models in 1915: a mathematical model for inventory order size. In the 1930s, three coworkers at Bell Telephone Labs, H. F. Dodge, H. G. Romig, and W. Shewhart, developed statistical procedures for sampling and quality con- trol. In 1935, L.H.C. Tippett conducted studies that provided the groundwork for statistical- sampling theory.

At first, these quantitative models were not widely used in industry. However, the onset of World War II changed that. The war generated tremendous pressures on manufacturing output, and specialists from many disciplines combined efforts to achieve advancements in the military and in manufacturing. After the war, efforts to develop and refine quantitative tools for decision making continued, resulting in decision models for forecasting, inventory management, project management, and other areas of operations management.

During the 1960s and 1970s, management science techniques were highly regarded; in the 1980s, they lost some favor. However, the widespread use of personal computers and user-friendly software in the workplace contributed to a resurgence in the popularity of these techniques.

Division of labor  The break- ing up of a production process into small tasks, so that each worker performs a small portion of the overall job.

ste24102_ch01_002-039.indd 23ste24102_ch01_002-039.indd 23 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

24 Chapter One Introduction to Operations Management

The Influence of Japanese Manufacturers A number of Japanese manufacturers developed or refined management practices that increased the productivity of their operations and the quality of their products, due in part to the influence of Americans W. Edwards Deming and Joseph Juran. This made them very competitive, spark- ing interest in their approaches by companies outside Japan. Their approaches emphasized quality and continual improvement, worker teams and empowerment, and achieving customer satisfaction. The Japanese can be credited with spawning the “quality revolution” that occurred in industrialized countries, and with generating widespread interest in lean production.

The influence of the Japanese on U.S. manufacturing and service companies has been enormous and promises to continue for the foreseeable future. Because of that influence, this book will provide considerable information about Japanese methods and successes.

Table 1.5 provides a chronological summary of some of the key developments in the evolu- tion of operations management.

1.9 OPERATIONS TODAY Advances in information technology and global competition have had a major influence on operations management. While the Internet offers great potential for business organizations, the potential as well as the risks must be clearly understood in order to determine if and how to exploit this potential. In many cases, the Internet has altered the way companies compete in the marketplace.

Electronic business, or e-business , involves the use of the Internet to transact business. E-business is changing the way business organizations interact with their customers and their suppliers. Most familiar to the general public is e-commerce , consumer–business transac- tions such as buying online or requesting information. However, business-to-business transac- tions such as e-procurement represent an increasing share of e-business. E-business is receiving

E-business  Use of the Internet to transact business.

E-commerce  Consumer-to- business transactions.

Approximate Date Contribution/Concept Originator

1776 Division of labor Adam Smith 1790 Interchangeable parts Eli Whitney 1911 Principles of scientific management Frederick W. Taylor 1911 Motion study, use of industrial psychology Frank and Lillian Gilbreth 1912 Chart for scheduling activities Henry Gantt 1913 Moving assembly line Henry Ford 1915 Mathematical model for inventory ordering F. W. Harris 1930 Hawthorne studies on worker motivation Elton Mayo 1935 Statistical procedures for sampling and

quality control H. F. Dodge, H. G. Romig,

W. Shewhart, L.H.C. Tippett 1940 Operations research applications in warfare Operations research groups 1947 Linear programming George Dantzig 1951 Commercial digital computers Sperry Univac, IBM 1950s Automation Numerous 1960s Extensive development of quantitative tools Numerous 1960s Industrial dynamics Jay Forrester 1975 Emphasis an manufacturing strategy W. Skinner 1980s Emphasis on flexibility, time-based competition,

lean production T. Ohno, S. Shingo, Toyota

1980s Emphasis on quality W. Edwards Deming, J. Juran, K. Ishikawa

1990s Internet, supply chain management Numerous 2000s Applications service providers and outsourcing Numerous

Social media, YouTube, and others. Numerous

TABLE 1.5 Historical summary of operations management

ste24102_ch01_002-039.indd 24ste24102_ch01_002-039.indd 24 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

Chapter One Introduction to Operations Management 25

increased attention from business owners and managers in developing strategies, planning, and decision making.

The word technology has several definitions, depending on the context. Generally, tech- nology refers to the application of scientific discoveries to the development and improve- ment of goods and services. It can involve knowledge, materials, methods, and equipment. The term high technology refers to the most advanced and developed machines and methods. Operations management is primarily concerned with three kinds of technology: product and service technology, process technology, and information technology (IT). All three can have a major impact on costs, productivity, and competitiveness.

Product and service technology refers to the discovery and development of new products and services. This is done mainly by researchers and engineers, who use the scientific approach to develop new knowledge and translate that into commercial applications.

Process technology refers to methods, procedures, and equipment used to produce goods and provide services. They include not only processes within an organization but also supply chain processes.

Information technology (IT) refers to the science and use of computers and other elec- tronic equipment to store, process, and send information. Information technology is heavily ingrained in today’s business operations. This includes electronic data process- ing, the use of bar codes to identify and track goods, obtaining point-of-sale information, data transmission, the Internet, e-commerce, e-mail, and more.

Management of technology is high on the list of major trends, and it promises to be high well into the future. For example, computers have had a tremendous impact on businesses in many ways, including new product and service features, process management, medical diag- nosis, production planning and scheduling, data processing, and communication. Advances in materials, methods, and equipment also have had an impact on competition and productivity. Advances in information technology also have had a major impact on businesses. Obviously there have been—and will continue to be—many benefits from technological advances. How- ever, technological advance also places a burden on management. For example, management must keep abreast of changes and quickly assess both their benefits and risks. Predicting advances can be tricky at best, and new technologies often carry a high price tag and usually a high cost to operate or repair. And in the case of computer operating systems, as new systems are introduced, support for older versions is discontinued, making periodic upgrades neces- sary. Conflicting technologies can exist that make technological choices even more difficult. Technological innovations in both products and processes will continue to change the way businesses operate, and hence require continuing attention.

The North American Free Trade Agreement (NAFTA) opened borders for trade between the United States and Canada and Mexico. The General Agreement on Tariffs and Trade (GATT) of 1994 reduced tariffs and subsidies in many countries, expanding world trade. The resulting global competition and global markets have had an impact on the strategies and operations of businesses large and small around the world. One effect is the importance busi- ness organizations are giving to management of their supply chains.

Globalization and the need for global supply chains have broadened the scope of supply chain management. However, tightened border security in certain instances has slowed some movement of goods and people. Moreover, in some cases, organizations are reassessing their use of offshore outsourcing.

Competitive pressures and changing economic conditions have caused business organiza- tions to put more emphasis on

Operations strategy.

Working with fewer resources.

Revenue management.

Process analysis and improvement, and quality improvement.

Agility.

Lean production.

Technology  The application of scientific discoveries to the development and improvement of goods and services.

ste24102_ch01_002-039.indd 25ste24102_ch01_002-039.indd 25 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

26 Chapter One Introduction to Operations Management

During the latter part of the 1900s, many companies neglected to include operations strat- egy in their corporate strategy. Some of them paid dearly for that neglect. Now more and more companies are recognizing the importance of operations strategy on the overall success of their business as well as the necessity for relating it to their overall business strategy.

Working with fewer resources due to layoffs, corporate downsizing, and general cost cut- ting is forcing managers to make trade-off decisions on resource allocation, and to place increased emphasis on cost control and productivity improvement.

Revenue management is a method used by some companies to maximize the revenue they receive from fixed operating capacity by influencing demand through price manipulation. Also known as yield management, it has been successfully used in the travel and tourism industries by airlines, cruise lines, hotels, amusement parks, and rental car companies, and in other industries such as trucking and public utilities.

Process analysis and improvement includes cost and time reduction, productivity improve- ment, process yield improvement, and quality improvement and increasing customer satisfac- tion. This is sometimes referred to as a six sigma process.

Given a boost by the “quality revolution” of the 1980s and 1990s, quality is now ingrained in business. Some businesses use the term total quality management (TQM) to describe their quality efforts. A quality focus emphasizes customer satisfaction and often involves team- work. Process improvement can result in improved quality, cost reduction, and time reduction. Time relates to costs and to competitive advantage, and businesses seek ways to reduce the time to bring new products and services to the marketplace to gain a competitive edge. If two companies can provide the same product at the same price and quality, but one can deliver it four weeks earlier than the other, the quicker company will invariably get the sale. Time reductions are being achieved in many companies now. Union Carbide was able to cut $400 million of fixed expenses, and Bell Atlantic was able to cut the time needed to hook up long- distance carriers from 15 days to less than 1, at a savings of $82 million.

Agility refers to the ability of an organization to respond quickly to demands or oppor- tunities. It is a strategy that involves maintaining a flexible system that can quickly respond to changes in either the volume of demand or changes in product/service offerings. This is particularly important as organizations scramble to remain competitive and cope with increas- ingly shorter product life cycles and strive to achieve shorter development times for new or improved products and services.

Six sigma  A process for reduc- ing costs, improving quality, and increasing customer satisfaction.

Agility  The ability of an orga- nization to respond quickly to demands or opportunities.

Lean production, a new approach to production, emerged in the 1990s. It incorporates a number of the recent trends listed here, with an emphasis on quality, flexibility, time reduc- tion, and teamwork. This has led to a flattening of the organizational structure, with fewer levels of management.

Lean systems are so named because they use much less of certain resources than typi- cal mass production systems use—space, inventory, and workers—to produce a comparable amount of output. Lean systems use a highly skilled workforce and flexible equipment. In effect, they incorporate advantages of both mass production (high volume, low unit cost) and

Lean system  System that uses minimal amounts of resources to produce a high volume of high- quality goods with some variety.

READINGAgility Creates a Competitive Edge

There is a huge demand in the United States and elsewhere for affordable women’s clothing. Low-cost clothing retailers such as Spain’s Zara and Sweden’s H & M are benefiting from their ability to quickly get mass- produced, trendy new fashions to store shelves while some less-agile competitors like Macy’s and Gap struggle to achieve the same results. A key factor for the agile retailers is their nearness to low-cost producers in Romania and Turkey, which greatly shortens transportation time. Ameri- can retailers often source from China, but increasing wages there and the

longer distance lessen their ability to take advan- tage of quickly introducing new low-cost fashions.

Question What possible solutions do you see for competitors such as Macy’s and Gap?

Source: Based on Roya Wolverson, “Need for Speed: Glamorizing Cheap Fashion Costs More than You Think,” Time, August 6, 2012, p. 18.

ste24102_ch01_002-039.indd 26ste24102_ch01_002-039.indd 26 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

Chapter One Introduction to Operations Management 27

craft production (variety and flexibility). And quality is higher than in mass production. This approach has now spread to services, including health care, offices, and shipping and delivery.

The skilled workers in lean production systems are more involved in maintaining and improving the system than their mass production counterparts. They are taught to stop an operation if they discover a defect, and to work with other employees to find and correct the cause of the defect so that it won’t recur. This results in an increasing level of quality over time and eliminates the need to inspect and rework at the end of the line.

Because lean production systems operate with lower amounts of inventory, additional emphasis is placed on anticipating when problems might occur before they arise and avoiding those problems through planning. Even so, problems can still occur at times, and quick reso- lution is important. Workers participate in both the planning and correction stages.

Compared to workers in traditional systems, much more is expected of workers in lean production systems. They must be able to function in teams, playing active roles in operating and improving the system. Individual creativity is much less important than team success. Responsibilities also are much greater, which can lead to pressure and anxiety not present in traditional systems. Moreover, a flatter organizational structure means career paths are not as steep in lean production organizations. Workers tend to become generalists rather than specialists, another contrast to more traditional organizations.

1.10 KEY ISSUES FOR TODAY’S BUSINESS OPERATIONS

There are a number of issues that are high priorities of many business organizations. Although not every business is faced with these issues, many are. Chief among the issues are the following:

Economic conditions. The lingering recession and slow recovery in various sectors of the economy has made managers cautious about investment and rehiring workers who had been laid off during the recession.

Innovating. Finding new or improved products or services are only two of the many possibilities that can provide value to an organization. Innovations can be made in pro- cesses, the use of the Internet, or the supply chain that reduce costs, increase productivity, expand markets, or improve customer service.

Quality problems. The numerous operations failures mentioned at the beginning of the chapter underscore the need to improve the way operations are managed. That relates to product design and testing, oversight of suppliers, risk assessment, and timely response to potential problems.

Risk management. The need for managing risk is underscored by recent events that include the crisis in housing, product recalls, oil spills, and natural and man-made disas- ters, and economic ups and downs. Managing risks starts with identifying risks, assessing vulnerability and potential damage (liability costs, reputation, demand), and taking steps to reduce or share risks.

Competing in a global economy. Low labor costs in third-world countries have increased pressure to reduce labor costs. Companies must carefully weigh their options, which include outsourcing some or all of their operations to low-wage areas, reducing costs internally, changing designs, and working to improve productivity.

Three other key areas require more in-depth discussion: environmental concerns, ethical conduct, and managing the supply chain.

Environmental Concerns Concern about global warming and pollution has had an increasing effect on how businesses operate.

LO1.9 Describe current issues in business that impact opera- tions management.

ste24102_ch01_002-039.indd 27ste24102_ch01_002-039.indd 27 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

Universities and colleges are increasingly embracing sustainability, link- ing it to global warming, biodiversity, and global commerce. Some are building sustainability into existing courses, while others are offering new courses, certificate programs, or degree programs. And some, such as Arizona State University and the Rochester Institute of Technology, are offering advanced degree programs.

Some universities are also “practicing what they preach,” by apply- ing sustainable practices in their operations. Among them are Dart- mouth College, Harvard University, Stanford, Williams College, and the

University of British Columbia, which was named by the environmental magazine Grist as one of the top 15 universities in the world in reducing greenhouse gas emissions and being energy efficient.

Source: Based on “The Sustainable University: Saving the Planet by Degrees,” Chronicle of Higher Education, Special Report, October 20, 2006, Stanford News Service, January 2007, and “B.C.’s School of Greener Learning,” Toronto Globe and Mail, August 25, 2007, p. A6.

READINGUniversities Embrace Sustainability

28 Chapter One Introduction to Operations Management

Stricter environmental regulations, particularly in developed nations, are being imposed. Fur- thermore, business organizations are coming under increasing pressure to reduce their carbon footprint (the amount of carbon dioxide generated by their operations and their supply chains) and to generally operate sustainable processes. Sustainability refers to service and production processes that use resources in ways that do not harm ecological systems that support both current and future human existence. Sustainability measures often go beyond traditional environmental and economic measures to include measures that incorporate social criteria in decision making.

All areas of business will be affected by this. Areas that will be most affected include product and service design, consumer education programs, disaster preparation and response, supply chain waste management, and outsourcing decisions. Note that outsourcing of goods production increases not only transportation costs, but also fuel consumption and carbon released into the atmosphere. Consequently, sustainability thinking may have implications for outsourcing decisions.

Because they all fall within the realm of operations, operations management is central to dealing with these issues. Sometimes referred to as “green initiatives,” the possibilities include reducing packaging, materials, water and energy use, and the environmental impact of the supply chain, including buying locally. Other possibilities include reconditioning used equipment (e.g., printers and copiers) for resale, and recycling.

Sustainability  Using resources in ways that do not harm ecolog- ical systems that support human existence.

Puma’s “Clever Little Bag” changes the idea of the shoebox by wrapping footwear in a cardboard structure with 65 percent less cardboard. It uses a bag made of recycled plastic as the outer layer that holds the inner cardboard structure together. Puma expects to cut carbon dioxide emissions by 10,000 tons per year and water, energy, and diesel use by 60 percent by using fewer materials—8,500 fewer tons of paper to be specific—and the new packaging’s lighter weight.

house gas emissions

ed he

ste24102_ch01_002-039.indd 28ste24102_ch01_002-039.indd 28 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

Chapter One Introduction to Operations Management 29

The following reading suggests that even our choice of diet can affect the environment.

READINGDiet and the Environment: Vegetarian vs. Nonvegetarian

Ethical Conduct The need for ethical conduct in business is becoming increasingly obvious, given numerous exam- ples of questionable actions in recent history. In making decisions, managers must consider how their decisions will affect shareholders, management, employees, customers, the community at large, and the environment. Finding solutions that will be in the best interests of all of these stake- holders is not always easy, but it is a goal that all managers should strive to achieve. Furthermore, even managers with the best intentions will sometimes make mistakes. If mistakes do occur, man- agers should act responsibly to correct those mistakes as quickly as possible, and to address any negative consequences.

Many organizations have developed codes of ethics to guide employees’ or members’ con- duct. Ethics is a standard of behavior that guides how one should act in various situations. The Markula Center for Applied Ethics at Santa Clara University identifies five principles for thinking ethically:

• The Utilitarian Principle is that the good done by an action or inaction should outweigh any harm it causes or might cause. An example is not allowing a person who has had too much to drink to drive.

• The Rights Principle is that actions should respect and protect the moral rights of others. An example is not taking advantage of a vulnerable person.

• The Fairness Principle is that equals should be held to, or evaluated by, the same standards. An example is equal pay for equal work.

• The Common Good Principle is that actions should contrib- ute to the common good of the community. An example is an ordinance on noise abatement.

• The Virtue Principle is that actions should be consistent with certain ideal virtues. Examples include honesty, compassion, generosity, tolerance, fidelity, integrity, and self-control.

Ethics  A standard of behavior that guides how one should act in various situations.

The Fair Trade Certified™ label guarantees to consumers that strict economic, social, and environmental criteria were met in the production and trade of an agricultural product.

It is interesting to examine the environmental impact of dietary choices. There’s ample evidence that agricultural practices pollute the soil, air, and water. Factors range from the distance food travels to get to the consumer, to the amount of water and fertilizer used. Of particular con- cern is the environmental impact of a diet high in animal protein. The Food and Agricultural Organization (FAO) of the United Nations recently reported that livestock production is one of the major causes of global warming and air and water pollution. Using a methodology that considers the entire supply chain, the FAO estimated that livestock accounts for 18 percent of greenhouse gas emissions.

A Vegetarian versus Nonvegetarian Diet and the Envi- ronment The eco-friendliness of a meat eater’s diet was the subject of a study conducted by researchers from the Departments of Environmental

Health and Nutrition of Loma Linda University in California. They compared the environmental effects of a vegetarian vs. nonvegetarian diet in California in terms of agricultural production inputs, including pesticides and fertilizers, water and energy.

“The study results showed that for the combined production of 11 food items the nonvegetarian diet required 2.9 times more water, 2.5 times more primary energy, 13 times more fertilizer, and 1.4 times more pesticides than did the vegetarian diet. The biggest differences came from including beef in the diet.”

Source: Based on “Finding a Scientific Connection Between Food Choices and the Environment,” Environmental Nutrition Newsletter, October 2009, p. 3.

ste24102_ch01_002-039.indd 29ste24102_ch01_002-039.indd 29 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

30 Chapter One Introduction to Operations Management

The center expands these principles to create a framework for ethical conduct. An ethical framework is a sequence of steps intended to guide thinking and subsequent decisions or actions. Here is the one developed by the Markula Center for Applied Ethics:

1. Recognize an ethical issue by asking if an action could be damaging to a group or an individual. Is there more to it than just what is legal?

2. Make sure the pertinent facts are known, such as who will be impacted, and what options are available.

3. Evaluate the options by referring to the appropriate preceding ethical principle.

4. Identify the “best” option and then further examine it by asking how someone you respect would view it.

5. In retrospect, consider the effect your decision had and what you can learn from it.

More detail is available at the Center’s Web site: http://www.scu.edu/ethics/practicing/ decision/framework.html .

Operations managers, like all managers, have the responsibility to make ethical decisions. Ethical issues arise in many aspects of operations management, including

• Financial statements: accurately representing the organization’s financial condition.

• Worker safety: providing adequate training, maintaining equipment in good working condition, maintaining a safe working environment.

• Product safety: providing products that minimize the risk of injury to users or damage to property or the environment.

• Quality: honoring warranties, avoiding hidden defects.

• The environment: not doing things that will harm the environment.

• The community: being a good neighbor.

• Hiring and firing workers: avoiding false pretenses (e.g., promising a long-term job when that is not what is intended).

• Closing facilities: taking into account the impact on a community, and honoring com- mitments that have been made.

• Workers’ rights: respecting workers’ rights, dealing with workers’ problems quickly and fairly.

The Ethisphere Institute recognizes companies worldwide for their ethical leadership. Here are some samples from their list:

Apparel: Gap.

Automotive: Ford Motor Company.

Business services: Paychex.

Café: Starbucks.

Computer hardware: Intel.

Computer software: Adobe Systems, Microsoft.

Consumer electronics: Texas Instruments, Xerox.

E-commerce: eBay.

General retail: Costco, Target.

Groceries: Safeway, Wegmans, Whole Foods.

Health and beauty: L’Oreal.

Logistics: UPS.

You can see a complete list of recent recipients and the selection criteria at Ethisphere.com .

Ethical framework  A sequence of steps intended to guide thinking and subsequent decision or action.

ste24102_ch01_002-039.indd 30ste24102_ch01_002-039.indd 30 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

Chapter One Introduction to Operations Management 31

The Need to Manage the Supply Chain Supply chain management is being given increasing attention as business organizations face mount- ing pressure to improve management of their supply chains. In the past, most organizations did little to manage their supply chains. Instead, they tended to concentrate on their own operations and on their immediate suppliers. Moreover, the planning, marketing, production and inventory manage- ment functions in organizations in supply chains have often operated independently of each other. As a result, supply chains experienced a range of problems that were seemingly beyond the con- trol of individual organizations. The problems included large oscillations of inventories, inventory stockouts, late deliveries, and quality problems. These and other issues now make it clear that man- agement of supply chains is essential to business success. The other issues include the following:

1. The need to improve operations. Efforts on cost and time reduction, and productivity and quality improvement, have expanded in recent years to include the supply chain. Oppor- tunity now lies largely with procurement, distribution, and logistics—the supply chain.

2. Increasing levels of outsourcing. Organizations are increasing their levels of outsourcing , buying goods or services instead of producing or providing them themselves. As out- sourcing increases, organizations are spending increasing amounts on supply-related activities (wrapping, packaging, moving, loading and unloading, and sorting). A signifi- cant amount of the cost and time spent on these and other related activities may be unnec- essary. Issues with imported products, including tainted food products, toothpaste, and pet foods, as well as unsafe tires and toys, have led to questions of liability and the need for companies to take responsibility for monitoring the safety of outsourced goods.

3. Increasing transportation costs. Transportation costs are increasing, and they need to be more carefully managed.

4. Competitive pressures. Competitive pressures have led to an increasing number of new products, shorter product development cycles, and increased demand for custom- ization. And in some industries, most notably consumer electronics, product life cycles are relatively short. Added to this are adoption of quick-response strategies and efforts to reduce lead times.

5. Increasing globalization. Increasing globalization has expanded the physical length of supply chains. A global supply chain increases the challenges of managing a supply chain. Having far-flung customers and/or suppliers means longer lead times and greater opportu- nities for disruption of deliveries. Often currency differences and monetary fluctuations are factors, as well as language and cultural differences. Also, tightened bor- der security in some instances has slowed shipments of goods.

6. Increasing importance of e-business. The increasing importance of e-business has added new dimensions to busi- ness buying and selling and has presented new challenges.

7. The complexity of supply chains. Supply chains are complex; they are dynamic, and they have many inherent uncertainties that can adversely affect them, such as inaccurate forecasts, late deliveries, sub- standard quality, equipment breakdowns, and canceled or changed orders.

LO1.10 Explain the need to manage the supply chain.

Outsourcing  Buying goods or services instead of producing or providing them in-house.

In Kachchh, India, Fairtrade allows cotton farmers to have the assurance of a minimum price, which gives them more security to plan their business and invest in their communities.

ste24102_ch01_002-039.indd 31ste24102_ch01_002-039.indd 31 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

32 Chapter One Introduction to Operations Management

8. The need to manage inventories. Inventories play a major role in the success or failure of a supply chain, so it is important to coordinate inventory levels throughout a supply chain. Shortages can severely disrupt the timely flow of work and have far-reaching impacts, while excess inventories add unnecessary costs. It would not be unusual to find inventory shortages in some parts of a supply chain and excess inventories in other parts of the same supply chain.

Elements of Supply Chain Management Supply chain management involves coordinating activities across the supply chain. Central to this is taking customer demand and translating it into corresponding activities at each level of the supply chain.

The key elements of supply chain management are listed in Table 1.6 . The first element, customers, is the driving element. Typically, marketing is responsible for determining what customers want as well as forecasting the quantities and timing of customer demand. Product and service design must match customer wants with operations capabilities.

Processing occurs in each component of the supply chain: it is the core of each organization. The major portion of processing occurs in the organization that produces the product or service for the final customer (the organization that assembles the computer, services the car, etc.). A major aspect of this for both the internal and external portions of a supply chain is scheduling.

Inventory is a staple in most supply chains. Balance is the main objective; too little causes delays and disrupts schedules, but too much adds unnecessary costs and limits flexibility.

Purchasing is the link between an organization and its suppliers. It is responsible for obtaining goods and/or services that will be used to produce products or provide services for the organization’s customers. Purchasing selects suppliers, negotiates contracts, establishes alliances, and acts as liaison between suppliers and various internal departments.

The supply portion of a value chain is made up of one or more suppliers, all links in the chain, and each one capable of having an impact on the effectiveness—or the ineffectiveness— of the supply chain. Moreover, it is essential that the planning and execution be carefully coordinated between suppliers and all members of the demand portion of their chains.

Location can be a factor in a number of ways. Where suppliers are located can be important, as can location of processing facilities. Nearness to market, nearness to sources of supply, or nearness to both may be critical. Also, delivery time and cost are usually affected by location.

Two types of decisions are relevant to supply chain management—strategic and opera- tional. The strategic decisions are the design and policy decisions. The operational decisions relate to day-to-day activities: managing the flow of material and product and other aspects of the supply chain in accordance with strategic decisions.

TABLE 1.6 Elements of supply chain management

Element Typical Issues Chapter(s)

Customers Determining what products and/or services customers want 3, 4 Forecasting Predicting the quantity and timing of customer demand 3 Design Incorporating customers, wants, manufacturability, and time to

market 4 Capacity planning Matching supply and demand 5, 11 Processing Controlling quality, scheduling work 10, 16 Inventory Meeting demand requirements while managing the costs of hold-

ing inventory 12, 13, 14 Purchasing Evaluating potential suppliers, supporting the needs of operations

on purchased goods and services 15 Suppliers Monitoring supplier quality, on-time delivery, and flexibility; main-

taining supplier relations 15 Location Determining the location of facilities 8 Logistics Deciding how to best move information and materials 15

ste24102_ch01_002-039.indd 32ste24102_ch01_002-039.indd 32 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

Chapter One Introduction to Operations Management 33

Wegmans Food Markets, Inc., is one of the premier grocery chains in the United States. Headquartered in Rochester, New York, Wegmans operates over 70 stores, mainly in Rochester, Buffalo, and Syracuse. There are also a handful of stores elsewhere in New York State and in New Jersey, Pennsylvania, and Virginia. The company employs over 45,000 people, and has annual sales of over $3 billion.

Wegmans has a strong reputation for offering its customers high product quality and excellent service. Through a combination of market research, trial and error, and listening to its customers, Wegmans has evolved into a very successful organization. Its sales per square foot are 50 percent higher than the industry average.

Superstores Many of the company’s stores are giant 100,000-square-foot super- stores, double or triple the size of average supermarkets. You can get an idea about the size of these stores from this: they usually have between 25 and 35 checkout lanes, and during busy periods, all of the checkouts are in operation. A superstore typically employs from 500 to 600 people.

Individual stores differ somewhat in terms of actual size and some special features. Aside from the features normally found in supermar- kets, they generally have a full-service deli (typically a 40-foot display case), a 500-square-foot fisherman’s wharf that has perhaps 10 differ- ent fresh fish offerings most days, a large bakery section (each store bakes its own bread, rolls, cakes, pies, and pastries), and extra-large

produce sections. They also offer film processing, a complete pharmacy, a card shop, video rentals, and an Olde World Cheese section. In-store floral shops range in size up to 800 square feet of floor space and offer a wide variety of fresh-cut flowers, flower arrangements, vases, and plants. In-store card shops cover over 1,000 square feet of floor space. The bulk foods department provides customers with the opportunity to select the quantities they desire from a vast array of foodstuffs and some nonfood items such as birdseed and pet food.

Each store is a little different. Among the special features in some stores are a dry cleaning department, a wokery, and a salad bar. Some stores feature a Market Café that has different food stations, each devoted to preparing and serving a certain type of food. For example, one station will have pizza and other Italian specialties, and another oriental food, and still another chicken or fish. There also will be a sand- wich bar, a salad bar, and a dessert station. Customers often wander among stations as they decide what to order. In some Market Cafés, diners can have wine with their meals and have brunch on Sundays. In several affluent locations, customers can stop in on their way home from work and choose from a selection of freshly prepared dinner entrees such as medallions of beef with herb butter, chicken Mar- sala, stuffed flank steak with mushrooms, Cajun tuna, crab cakes, and accompaniments such as roasted red potatoes, grilled vegetables, and

OPERATIONS TOURWegmans Food Markets

(continued)

The major decision areas in supply chain management are location, production, distribu- tion, and inventory. The location decision relates to the choice of locations for both produc- tion and distribution facilities. Production and transportation costs and delivery lead times are important. Production and distribution decisions focus on what customers want, when they want it, and how much is needed. Outsourcing can be a consideration. Distribution decisions are strongly influenced by transportation cost and delivery times, because transportation costs often represent a significant portion of total cost. Moreover, shipping alternatives are closely tied to production and inventory decisions. For example, using air transport means higher costs but faster deliveries and less inventory in transit than sea, rail, or trucking options. Dis- tribution decisions must also take into account capacity and quality issues. Operational deci- sions focus on scheduling, maintaining equipment, and meeting customer demand. Quality control and workload balancing are also important considerations. Inventory decisions relate to determining inventory needs and coordinating production and stocking decisions through- out the supply chain. Logistics management plays the key role in inventory decisions.

Enterprise Resource Planning (ERP) is being increasingly used to provide information sharing in real time among organizations and their major supply chain partners. This impor- tant topic is discussed in more detail in Chapter 12.

Operations Tours Throughout the book you will discover operations tours that describe operations in all sorts of companies. The tour you are about to read is Wegmans Food Markets, a major regional super- market chain and one of the largest privately held companies in the United States. Wegmans has been consistently ranked high on Fortune magazine’s list of the 100 Best Companies to Work For since the inception of the survey a decade ago. In 2005 Wegmans was ranked num- ber one on the list.

h i i

ste24102_ch01_002-039.indd 33ste24102_ch01_002-039.indd 33 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

Caesar salad. Many Wegmans stores offer ready-made sandwiches as well as made-to-order sandwiches. Some stores have a coffee-shop section with tables and chairs where shoppers can enjoy regular or spe- cialty coffees and a variety of tempting pastries.

Produce Department The company prides itself on fresh produce. Produce is replenished as often as 12 times a day. The larger stores have produce sections that are four to five times the size of a produce section in an average super- market. Wegmans offers locally grown produce in season. Wegmans uses a “farm to market” system whereby some local growers deliver their produce directly to individual stores, bypassing the main ware- house. That reduces the company’s inventory holding costs and gets the produce into the stores as quickly as possible. Growers may use specially designed containers that go right onto the store floor instead of large bins. This avoids the bruising that often occurs when fruits and vegetables are transferred from bins to display shelves and the need to devote labor to transfer the produce to shelves.

Meat Department In addition to large display cases of both fresh and frozen meat prod- ucts, many stores have a full-service butcher shop that offers a variety of fresh meat products and where butchers are available to provide cus- tomized cuts of meat for customers.

Meat department employees attend Wegmans’ “Meat University,” where they learn about different cuts of meat and how to best pre- pare them. They also learn about other items to pair with various meats, and suggest side dishes, breads, and wine. This helps instill a “selling culture” among employees, who often spend 75 percent of their time talking with customers.

Wegmans continually analyzes store operations to improve pro- cesses. In the meat department, a change from in-store cutting and traditional packaging to using a centralized meat processing facility and vacuum packaging extended the shelf life of meats and reduced staff- ing requirements in meat departments, reducing costs and providing customers with an improved product.

Ordering Each department handles its own ordering. Although sales records are available from records of items scanned at the checkouts, they are not used directly for replenishing stock. Other factors—such as pricing, special promotions, and local circumstances (e.g., festivals, weather conditions)—must all be taken into account. However, for seasonal periods, such as holidays, managers often check scanner records to learn what past demand was during a comparable period.

The superstores typically receive one truckload of goods per day from the main warehouse. During peak periods, a store may receive two truckloads from the main warehouse. The short lead time greatly reduces the length of time an item might be out of stock, unless the main warehouse is also out of stock.

The company exercises strict control over suppliers, insisting on product quality and on-time deliveries.

Inventory Management Some stores carry as many as 70,000 individual units. Wegmans uses a companywide system to keep track of inventory. Departments take a monthly inventory count to verify the amount shown in the com- panywide system. Departments receive a periodic report indicating how many days of inventory the department has on hand. Having an

Wegmans’ Patisserie is an authentic French pastry shop.

(continued)

34 Chapter One Introduction to Operations Management

ste24102_ch01_002-039.indd 34ste24102_ch01_002-039.indd 34 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

appropriate amount on hand is important to department managers: If they have too much inventory on hand, that will add to their depart- ment’s costs, whereas having too little inventory will result in shortages and thus lost sales and dissatisfied customers.

Employees The company recognizes the value of good employees. It typically invests an average of $7,000 to train each new employee. In addition to learning about store operations, new employees learn the importance of good customer service and how to provide it. The employees are help- ful, cheerfully answering customer questions or handling complaints. Employees are motivated through a combination of compensation, profit sharing, and benefits. Employee turnover for full-time workers is about 6 percent, compared to the industry average of about 20 percent.

Quality Quality and customer satisfaction are utmost in the minds of Wegmans’ management and its employees. Private-label food items as well as name brands are regularly evaluated in test kitchens, along with poten- tial new products. Managers are responsible for checking and main- taining product and service quality in their departments. Moreover, employees are encouraged to report problems to their managers.

If a customer is dissatisfied with an item, and returns it, or even a portion of the item, the customer is offered a choice of a replacement or a refund. If the item is a Wegmans brand food item, it is then sent to the test kitchen to determine the cause of the problem. If the cause can be determined, corrective action is taken.

Technology Wegmans continues to adopt new technologies to maintain its competi- tive edge, including new approaches to tracking inventory and manag- ing its supply chain, and new ways to maintain freshness in the meat and produce departments.

Sustainability Wegmans began replacing incandescent light bulbs with compact fluo- rescent bulbs in 2007, generating 3,000 fewer tons of carbon dioxide each year. Also the company installed sensors in its dairy cases that reduced the time the cooling systems run by 50 percent.

Questions

1. How do customers judge the quality of a supermarket? 2. Indicate how and why each of these factors is important to the suc-

cessful operation of a supermarket: a. Customer satisfaction. b. Forecasting. c. Capacity planning. d. Location. e. Inventory management. f. Layout of the store. g. Scheduling. 3. What are some of the ways Wegmans uses technology to gain an

edge over its competition?

Fresh seafood is delivered daily, often direct from boat to store the same day it was caught.

Wegmans’ chefs fill the Chef’s Case with ready-to-eat and ready-to-heat entrees, side dishes, and salads.

Chapter One Introduction to Operations Management 35

ste24102_ch01_002-039.indd 35ste24102_ch01_002-039.indd 35 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

36 Chapter One Introduction to Operations Management

The operations function in business organizations is responsible for producing goods and providing services. It is a core function of every business. Supply chains are the sequential system of suppliers and customers that begins with basic sources of inputs and ends with final customers of the system. Operations and supply chains are interdependent—one couldn’t exist without the other, and no business organization could exist without both.

Operations management involves system design and operating decisions related to product and ser- vice design, capacity planning, process selection, location selection, work management, inventory and supply management, production planning, quality assurance, scheduling, and project management.

The historical evolution of operations management provides interesting background information on the continuing evolution of this core business function.

The Operations Tours and Readings included in this and subsequent chapters provide insights into actual business operations.

SUMMARY

1. The operations function is that part of every business organization that produces products and/or delivers services.

2. Operations consists of processes that convert inputs into outputs. Failure to manage those processes effectively will have a negative impact on the organization.

3. A key goal of business organizations is to achieve an economic matching of supply and demand. The operations function is responsible for providing the supply or service capacity for expected demand.

4. All processes exhibit variation that must be managed.

5. Although there are some basic differences between services and products that must be taken into account from a managerial standpoint, there are also many similarities between the two.

6. Environmental issues will increasingly impact operations decision making.

7. Ethical behavior is an integral part of good management practice.

8. All business organizations have, and are part of, a supply chain that must be managed.

KEY POINTS

agility, 26 craft production, 21 division of labor, 23 e-business, 24 e-commerce, 24 ethical framework, 30 ethics, 29 goods, 3

interchangeable parts, 22 lead time, 10 lean system, 26 mass production, 22 model, 18 operations management, 4 outsourcing, 31 Pareto phenomenon, 20

process, 12 services, 3 six sigma, 26 supply chain, 4 sustainability, 28 system, 20 technology, 25 value-added, 7

KEY TERMS

1. Briefly describe the terms operations management and supply chain.

2. Identify the three major functional areas of business organizations and briefly describe how they interrelate.

3. Describe the operations function and the nature of the operations manager’s job.

4. List five important differences between goods production and service operations; then list five important similarities.

5. Briefly discuss each of these terms related to the historical evolution of operations management: a. Industrial Revolution b. Scientific management c. Interchangeable parts d. Division of labor

6. Why are services important? Why is manufacturing important? What are nonmanufactured goods?

7. What are models and why are they important?

8. Why is the degree of customization an important consideration in process planning?

9. List the trade-offs you would consider for each of these decisions: a. Driving your own car versus public transportation. b. Buying a computer now versus waiting for an improved model.

DISCUSSION AND REVIEW QUESTIONS

ste24102_ch01_002-039.indd 36ste24102_ch01_002-039.indd 36 11/29/13 1:01 AM11/29/13 1:01 AM

Final PDF to printer

Chapter One Introduction to Operations Management 37

c. Buying a new car versus buying a used car. d. Speaking up in class versus waiting to get called on by the instructor. e. A small business owner having a Web site versus newspaper advertising.

10. Describe each of these systems: craft production, mass production, and lean production.

11. Why might some workers prefer not to work in a lean production environment?

12. Discuss the importance of each of the following: a. Matching supply and demand b. Managing a supply chain

13. List and briefly explain the four basic sources of variation, and explain why it is important for managers to be able to effectively deal with variation.

14. Why do people do things that are unethical?

15. Explain the term value-added.

16. Discuss the various impacts of outsourcing.

17. Discuss the term sustainability, and its relevance for business organizations.

TAKING STOCK This item appears at the end of each chapter. It is intended to focus your attention on three key issues for business organizations in general, and operations management in particular. Those issues are trade-off decisions, collaboration among various functional areas of the organization, and the impact of technol- ogy. You will see three or more questions relating to these issues. Here is the first set of questions:

1. What are trade-offs? Why is careful consideration of trade-offs important in decision making?

2. Why is it important for the various functional areas of a business organization to collaborate?

3. In what general ways does technology have an impact on operations management decision making?

CRITICAL THINKING

EXERCISES

This item also will appear in every chapter. It allows you to critically apply information you learned in the chapter to a practical situation. Here is the first set of exercises:

1. Many organizations offer a combination of goods and services to their customers. As you learned in this chapter, there are some key differences between production of goods and delivery of services. What are the implications of these differences relative to managing operations?

2. Why is it important to match supply and demand? If a manager believes that supply and demand will not be equal, what actions could the manager take to increase the probability of achieving a match?

3. One way that organizations compete is through technological innovation. However, there can be downsides for both the organization and the consumer. Explain.

4. a. What are some possible reasons a business person would make an unethical decision?

b. What are the risks of doing so?

Hazel had worked for the same Fortune 500 company for almost 15 years. Although the company had gone through some tough times, things were starting to turn around. Customer orders were up, and quality and productivity had improved dramatically from what they had been only a few years earlier due to a companywide quality improve- ment program. So it came as a real shock to Hazel and about 400 of her coworkers when they were suddenly terminated following the new CEO’s decision to downsize the company.

After recovering from the initial shock, Hazel tried to find employ- ment elsewhere. Despite her efforts, after eight months of searching she was no closer to finding a job than the day she started. Her funds were being depleted and she was getting more discouraged. There was

one bright spot, though: She was able to bring in a little money by mowing lawns for her neighbors. She got involved quite by chance when she heard one neighbor remark that now that his children were on their own, nobody was around to cut the grass. Almost jokingly, Hazel asked him how much he’d be will- ing to pay. Soon Hazel was mowing the lawns of five neighbors. Other neighbors wanted her to work on their lawns, but she didn’t feel that she could spare any more time from her job search.

However, as the rejection letters began to pile up, Hazel knew she had to make a decision. On a sunny Tuesday morning, she decided, like many others in a similar situation, to go into business for herself—taking

CASEHazel

(continued)

ste24102_ch01_002-039.indd 37ste24102_ch01_002-039.indd 37 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

38 Chapter One Introduction to Operations Management

care of neighborhood lawns. She was relieved to give up the stress of job hunting, and she was excited about the prospect of being her own boss. But she was also fearful of being completely on her own. Never- theless, Hazel was determined to make a go of it.

At first, business was a little slow, but once people realized Hazel was available, many asked her to take care of their lawns. Some people were simply glad to turn the work over to her; others switched from professional lawn care services. By the end of her first year in busi- ness, Hazel knew she could earn a living this way. She also performed other services such as fertilizing lawns, weeding gardens, and trimming shrubbery. Business became so good that Hazel hired two part-time workers to assist her and, even then, she believed she could expand further if she wanted to.

Questions

1. Hazel is the operations manager of her business. Among her respon- sibilities are forecasting, inventory management, scheduling, quality assurance, and maintenance. a. What kinds of things would likely require forecasts? b. What inventory items does Hazel probably have? Name one

inventory decision she has to make periodically. c. What scheduling must she do? What things might occur to dis-

rupt schedules and cause Hazel to reschedule? d. How important is quality assurance to Hazel’s business? Explain. e. What kinds of maintenance must be performed?

2. In what ways are Hazel’s customers most likely to judge the quality of her lawn care services?

3. What are some of the trade-offs that Hazel probably considered relative to:

a. Working for a company instead of for herself? b. Expanding the business? c. Launching a Web site?

4. The town is considering an ordinance that would prohibit putting grass clippings at the curb for pickup because local landfills can- not handle the volume. What options might Hazel consider if the ordinance is passed? Name two advantages and two drawbacks of each option.

5. Hazel decided to offer the students who worked for her a bonus of $25 for ideas on how to improve the business, and they provided several good ideas. One idea that she initially rejected now appears to hold great promise. The student who proposed the idea has left, and is currently working for a competitor. Should Hazel send that student a check for the idea? What are the possible trade-offs?

6. All managers have to cope with variation. a. What are the major sources of variation that Hazel has to con-

tend with? b. How might these sources of variation impact Hazel’s ability to

match supply and demand? c. What are some ways she can cope with variation?

7. Hazel is thinking of making some of her operations sustainable. What are some ideas she might consider?

(continued)

Bloomberg Businessweek

Bowie, Norman E., ed. The Blackwell Guide to Busi- ness Ethics. Malden, MA: Blackwell, 2002.

Fitzsimmons, James, and Mona Fitzsimmons. Service Management, 4th ed. New York: McGraw-Hill/ Irwin, 2011.

Fortune magazine.

Womack, James P., Daniel Jones, and Daniel Roos. The Machine That Changed the World. New York: Harper Perennial, 1991, 2007.

Wisner, Joel D., and Linda L. Stanley. Process Man- agement: Creating Value Along the Supply Chain. Mason, OH: Thomson South-Western, 2008.

SELECTED BIBLIOGRAPHY AND FURTHER READINGS

PROBLEM-SOLVING GUIDE

Here is a procedure that will help you solve most of the end-of-chapter problems in this book and on exams:

1. Identify the question to be answered. This is critical.

2. Summarize the information given in the problem statement using the appropriate symbols.

3. Determine what type of problem it is so you can select the appropriate problem-solving tools such as a formula or table. Check your notes from class, chapter examples, and the Solved Prob- lems section of the chapter, and any preceding chapter problems you have already solved for guidance.

4. Solve the problem and indicate your answer.

Example 1 Department A can produce parts at a rate of 50/day. Department B uses those parts are the rate of 10/ day. Each day unused parts are added to inventory. At what rate does the inventory of unused parts build up?

ste24102_ch01_002-039.indd 38ste24102_ch01_002-039.indd 38 11/29/13 1:02 AM11/29/13 1:02 AM

Final PDF to printer

Chapter One Introduction to Operations Management 39

1. The question to be answered: At what rate does inventory of unused parts build up (i.e., increase) per day?

2. The given information: Production rate � 50 parts/day Usage rate � 10 parts/day

3. For this simple problem, no formula or table is needed. Inventory buildup is simply the differ- ence between the production and usage rates.

4. Production rate � 50 parts/day Usage rate � 10 parts/day Inventory buildup � 40 parts/day

Solution

Example 2 Companies often use this formula to determine how much of a certain item to order: Q

DS

H =

2

where

Problem-Solving Template

Problem number:

The question to be answered:

Information given:

Solve using:

Q   �  order quantity D   �  annual demand

S �  ordering cost H   �  annual holding cost per unit

If annual demand is 400 units, ordering cost is $36, and annual holding cost is $2 per unit, what is the order quantity?

Solution 1. The question to be answered: What is the order quantity, Q? 2. The information given in the problem: D   �  400 units/year,  S   �  $36,  H   �  $2 per year

3. To solve the problem, substitute the values given in the problem into the formula.

4. Solution: = = 2(400 / .)$36

$2/ / . 120 unitsQ

units yr

unit yr

ste24102_ch01_002-039.indd 39ste24102_ch01_002-039.indd 39 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

40

C H A P T E R

2 CHAPTER OUTLINE

2.1 Introduction, 41

2.2 Competitiveness, 42 Why Some Organizations Fail, 43

2.3 Mission and Strategies, 44 Strategies and Tactics, 45

Strategy Formulation, 46

Supply Chain Strategy, 50

Sustainability Strategy, 50

Global Strategy, 50

2.4 Operations Strategy, 51 Strategic Operations Management Decision Areas, 52

Quality and Time Strategies, 53

2.5 Implications of Organization Strategy for Operations Management, 54

2.6 Transforming Strategy into Action: The Balanced Scorecard, 54

2.7 Productivity, 56 Computing Productivity, 57

Productivity in the Service Sector, 59

Factors That Affect Productivity, 60

Improving Productivity, 61

Cases: An American Tragedy: How a Good Company Died, 66

Home-Style Cookies, 67

Hazel Revisited, 69

“Your Garden Gloves,” 69

Operations Tour: The U.S. Postal Service, 70

Competitiveness, Strategy, and Productivity

After completing this chapter, you should be able to:

LO2.1 List several ways that business organizations compete.

LO2.2 Name several reasons that business organizations fail.

LO2.3 Define the terms mission and strategy and explain why they are important.

LO2.4 Discuss and compare organization strategy and operations strategy and explain why it is important to link the two.

LO2.5 Describe and give examples of time-based strategies.

LO2.6 Define the term productivity and explain why it is important to organizations and to countries.

LO2.7 Describe several factors that affect productivity.

LEARNING OBJECTIVES

ste24102_ch02_040-073.indd 40ste24102_ch02_040-073.indd 40 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

41

This chapter discusses competitiveness, strategy, and productiv- ity, three separate but related topics that are vitally important to business organizations. Competitiveness relates to the effec- tiveness of an organization in the marketplace relative to other organizations that offer similar products or services. Operations and marketing have a major impact on competitiveness. Strategy relates to the plans that determine how an organization pursues its goals. Operations strategy is particularly important in this regard. Productivity relates to the effective use of resources, and it has a direct impact on competitiveness. Operations manage- ment is chiefly responsible for productivity.

THE COLD HARD FACTS

The name of the game is competition. The playing field is global. Those who understand how to play the game will succeed; those who don’t are doomed to failure. And don’t think the game is just companies competing with each other. In companies that have multiple factories or divi- sions producing the same good or service, factories or divi- sions sometimes find themselves competing with each other. When a competitor—another company or a sister factory or division in the same company—can turn out products better, cheaper, and faster, that spells real trouble for the factory or division that is performing at a lower level. The trouble can be layoffs or even a shutdown if the managers can’t turn things around. The bottom line? Better quality, higher productivity, lower costs, and the ability to quickly respond to customer needs are more important than ever, and the bar is getting higher. Business organizations need to develop solid strategies for dealing with these issues.

2.1 INTRODUCTION In this chapter you will learn about the different ways companies compete and why some firms do a very good job of competing. You will learn how effective strategies can lead to competitive organizations, and you will learn what productivity is, why it is important, and what organizations can do to improve it.

ste24102_ch02_040-073.indd 41ste24102_ch02_040-073.indd 41 11/10/13 4:06 PM11/10/13 4:06 PM

Final PDF to printer

42 Chapter Two Competitiveness, Strategy, and Productivity

2.2 COMPETITIVENESS Companies must be competitive to sell their goods and services in the marketplace. Competitiveness is an important factor in determining whether a company prospers, barely gets by, or fails. Business organizations compete through some combination of price, delivery time, and product or service differentiation.

Marketing influences competitiveness in several ways, including identifying consumer wants and needs, pricing, and advertising and promotion.

1. Identifying consumer wants and/or needs is a basic input in an organization’s decision-making process, and central to competitiveness. The ideal is to achieve a per- fect match between those wants and needs and the organization’s goods and/or services.

2. Price and quality are key factors in consumer buying decisions. It is important to understand the trade-off decision consumers make between price and quality.

3. Advertising and promotion are ways organizations can inform potential customers about features of their products or services, and attract buyers.

Operations has a major influence on competitiveness through product and service design, cost, location, quality, response time, flexibility, inventory and supply chain management, and service. Many of these are interrelated.

1. Product and service design should reflect joint efforts of many areas of the firm to achieve a match between financial resources, operations capabilities, supply chain capa- bilities, and consumer wants and needs. Special characteristics or features of a product or service can be a key factor in consumer buying decisions. Other key factors include innovation and the time-to-market for new products and services.

2. Cost of an organization’s output is a key variable that affects pricing decisions and prof- its. Cost-reduction efforts are generally ongoing in business organizations. Productivity (discussed later in the chapter) is an important determinant of cost. Organizations with higher productivity rates than their competitors have a competitive cost advantage. A company may outsource a portion of its operation to achieve lower costs, higher produc- tivity, or better quality.

3. Location can be important in terms of cost and convenience for customers. Location near inputs can result in lower input costs. Location near markets can result in lower transportation costs and quicker delivery times. Convenient location is particularly important in the retail sector.

4. Quality refers to materials, workmanship, design, and service. Consumers judge qual- ity in terms of how well they think a product or service will satisfy its intended purpose. Customers are generally willing to pay more for a product or service if they perceive the product or service has a higher quality than that of a competitor.

5. Quick response can be a competitive advantage. One way is quickly bringing new or improved products or services to the market. Another is being able to quickly deliver existing products and services to a customer after they are ordered, and still another is quickly handling customer complaints.

6. Flexibility is the ability to respond to changes. Changes might relate to alterations in design features of a product or service, or to the volume demanded by customers, or the mix of products or services offered by an organization. High flexibility can be a com- petitive advantage in a changeable environment.

7. Inventory management can be a competitive advantage by effectively matching sup- plies of goods with demand.

8. Supply chain management involves coordinating internal and external operations (buyers and suppliers) to achieve timely and cost-effective delivery of goods throughout the system.

9. Service might involve after-sale activities customers perceive as value-added, such as delivery, setup, warranty work, and technical support. Or it might involve extra atten- tion while work is in progress, such as courtesy, keeping the customer informed, and

Competitiveness  How effec- tively an organization meets the wants and needs of customers relative to others that offer simi- lar goods or services.

LO2.1 List several ways that business organizations compete.

ste24102_ch02_040-073.indd 42ste24102_ch02_040-073.indd 42 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

Chapter Two Competitiveness, Strategy, and Productivity 43

attention to details. Service quality can be a key differentiator; and it is one that is often sustainable. Moreover, businesses rated highly by their customers for service quality tend to be more profitable, and grow faster, than businesses that are not rated highly.

10. Managers and workers are the people at the heart and soul of an organization, and if they are competent and motivated, they can provide a distinct competitive edge by their skills and the ideas they create. One often overlooked skill is answering the telephone. How complaint calls or requests for information are handled can be a positive or a nega- tive. If a person answering is rude or not helpful, that can produce a negative image. Conversely, if calls are handled promptly and cheerfully, that can produce a positive image and, potentially, a competitive advantage.

Why Some Organizations Fail Organizations fail, or perform poorly, for a variety of reasons. Being aware of those reasons can help managers avoid making similar mistakes. Among the chief reasons are the following:

1. Neglecting operations strategy.

2. Failing to take advantage of strengths and opportunities, and/or failing to recognize competitive threats.

3. Putting too much emphasis on short-term financial performance at the expense of research and development.

4. Placing too much emphasis on product and service design and not enough on process design and improvement.

5. Neglecting investments in capital and human resources.

6. Failing to establish good internal communications and cooperation among different functional areas.

7. Failing to consider customer wants and needs.

The key to successfully competing is to determine what customers want and then directing efforts toward meeting (or even exceeding) customer expectations. Two basic issues must be addressed. First: What do the customers want? (Which items on the preceding list of the ways business organi- zations compete are important to customers?) Second: What is the best way to satisfy those wants?

Operations must work with marketing to obtain information on the relative importance of the various items to each major customer or target market.

Understanding competitive issues can help managers develop successful strategies.

LO2.2 Name several reasons that business organizations fail.

Indian operators take calls at Quatro call center in Gurgaon on the outskirts of New Delhi. Companies take advantage of communications and software support offshore to drive down costs. This industry in India already provides over one million jobs.

ste24102_ch02_040-073.indd 43ste24102_ch02_040-073.indd 43 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

44 Chapter Two Competitiveness, Strategy, and Productivity

2.3 MISSION AND STRATEGIES An organization’s mission is the reason for its existence. It is expressed in its mission statement. For a business organization, the mission statement should answer the question “What business are we in?” Missions vary from organization to organization, depending on the nature of their business. Table 2.1 provides several examples of mission statements.

A mission statement serves as the basis for organizational goals, which provide more detail and describe the scope of the mission. The mission and goals often relate to how an organiza- tion wants to be perceived by the general public, and by its employees, suppliers, and custom- ers. Goals serve as a foundation for the development of organizational strategies. These, in turn, provide the basis for strategies and tactics of the functional units of the organization.

Organizational strategy is important because it guides the organization by providing direc- tion for, and alignment of, the goals and strategies of the functional units. Moreover, strate- gies can be the main reason for the success or failure of an organization.

There are three basic business strategies:

• Low cost.

• Responsiveness.

• Differentiation from competitors.

LO2.3 Define the terms mis- sion and strategy and explain why they are important.

Mission  The reason for the existence of an organization.

Mission statement  States the purpose of an organization.

Goals  Provide detail and scope of the mission.

Strategies  Plans for achieving organizational goals.

Microsoft To help people and businesses throughout the world to realize their full potential. Verizon To help people and businesses communicate with each other. Starbucks To inspire and nurture the human spirit—one cup and one neighborhood at a time. U.S. Dept. of Education

To promote student achievement and preparation for global competitiveness and fostering educational excellence and ensuring equal access.

TABLE 2.1 Selected portions of company mission statements

IS IT A STRATEGIC, TACTICAL, OR OPERATIONAL ISSUE? Sometimes the same issue may apply to all three levels. However, a key difference is the time frame. From a strategic perspective,

long-term implications are most relevant. From tactical and opera- tional perspectives, the time frames are much shorter. In fact, the operational time frame is often measured in days.

Responsiveness relates to ability to respond to changing demands. Differentiation can relate to product or service features, quality, reputation, or customer service. Some organiza- tions focus on a single strategy while others employ a combination of strategies. One com- pany that has multiple strategies is Amazon.com . Not only does it offer low cost and quick, reliable deliveries, it also excels in customer service.

Amazon’s service helped propel the company to double- digit sales. Amazon started same-day shipping in major cities, launched a program to urge manufacturers to drop frustrating packaging, and extended its service reach by acquiring free-shipping pioneer Zappos.com .

ste24102_ch02_040-073.indd 44ste24102_ch02_040-073.indd 44 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

45

Strategies and Tactics If you think of goals as destinations, then strategies are the roadmaps for reaching the des- tinations. Strategies provide focus for decision making. Generally speaking, organizations have overall strategies called organizational strategies, which relate to the entire organization. They also have functional strategies, which relate to each of the functional areas of the orga- nization. The functional strategies should support the overall strategies of the organization, just as the organizational strategies should support the goals and mission of the organization.

Tactics are the methods and actions used to accomplish strategies. They are more specific than strategies, and they provide guidance and direction for carrying out actual operations, which need the most specific and detailed plans and decision making in an organization. You might think of tactics as the “how to” part of the process (e.g., how to reach the destination, following the strategy roadmap) and operations as the actual “doing” part of the process. Much of this book deals with tactical operations.

It should be apparent that the overall relationship that exists from the mission down to actual operations is hierarchical. This is illustrated in Figure 2.1 .

A simple example may help to put this hierarchy into perspective.

Tactics  The methods and actions taken to accomplish strategies.

though she had paid the merchant, not Amazon. And she wasn’t asked to return the book.

Amazon sees its customer service as a way to enhance customer experience, and as a way to identify potential problems with merchants. In fact, if merchants have problems with more than 1 percent of their orders, that can get them removed from the site.

Source: Based on “How Amazon Aims to Keep You Clicking,” BusinessWeek, March 2009, p. 34.

Amazon received the top spot in customer service in a recent Business- Week ranking. Although most Amazon customers never talk with an employee, when something goes wrong, Amazon excels in dealing with the problem. In one case, when a New Jersey woman received a work- book she ordered that was described as “like new,” she was surprised to discover that it wasn’t even close to new—worksheets had already been filled in. She complained to the merchant but didn’t get a response. Then she complained to Amazon. She promptly received a refund, even

READING AMAZON Tops in Customer Service

FIGURE 2.1 Planning and decision making are hierarchical in organizations

Organizational goals

Mission

Organizational strategies

Functional goals

Marketing strategies

Finance strategies

Operations strategies

TacticsTactics Tactics

Operating procedures

Operating procedures

Operating procedures

to enhance customer

n.

ste24102_ch02_040-073.indd 45ste24102_ch02_040-073.indd 45 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

46 Chapter Two Competitiveness, Strategy, and Productivity

Here are some examples of different strategies an organization might choose from:

Low cost. Outsource operations to third-world countries that have low labor costs.

Scale-based strategies. Use capital-intensive methods to achieve high output volume and low unit costs.

Specialization. Focus on narrow product lines or limited service to achieve higher quality.

Newness. Focus on innovation to create new products or services.

Flexible operations. Focus on quick response and/or customization.

High quality. Focus on achieving higher quality than competitors.

Service. Focus on various aspects of service (e.g., helpful, courteous, reliable, etc.).

Sustainability. Focus on environmental-friendly and energy-efficient operations.

A wide range of business organizations are beginning to recognize the strategic advantages of sustainability, not only in economic terms, but also in promotional benefit by publicizing their sustainability efforts and achievements.

Sometimes organizations will combine two or more of these or other approaches into their strategy. However, unless they are careful, they risk losing focus and not achieving advan- tage in any category. Generally speaking, strategy formulation takes into account the way organizations compete and a particular organization’s assessment of its own strengths and weaknesses in order to take advantage of its core competencies —those special attributes or abilities possessed by an organization that give it a competitive edge.

The most effective organizations use an approach that develops core competencies based on customer needs as well as on what the competition is doing. Marketing and operations work closely to match customer needs with operations capabilities. Competitor competen- cies are important for several reasons. For example, if a competitor is able to supply high- quality products, it may be necessary to meet that high quality as a baseline. However, merely matching a competitor is usually not sufficient to gain market share. It may be neces- sary to exceed the quality level of the competitor or gain an edge by excelling in one or more other dimensions, such as rapid delivery or service after the sale. Walmart, for example, has been very successful in managing its supply chain, which has contributed to its competitive advantage.

To be effective, strategies and core competencies need to be aligned. Table 2.2 lists exam- ples of strategies and companies that have successfully employed those strategies.

Strategy Formulation Strategy formulation is almost always critical to the success of a strategy. Walmart discovered that when it opened stores in Japan. Although Walmart thrived in many countries on its repu- tation for low-cost items, Japanese consumers associated low cost with low quality, causing Walmart to rethink its strategy in the Japanese market. And many felt that Hewlett-Packard (HP) committed a strategic error when it acquired Compaq Computers at a cost of $19  billion. HP’s share of the computer market was less after the merger than the sum of the shares of the separate companies before the merger. In another example, U.S. automakers adopted a

Core competencies  The spe- cial attributes or abilities that give an organization a competi- tive edge.

Rita is a high school student in Southern California. She would like to have a career in busi- ness, have a good job, and earn enough income to live comfortably.

A possible scenario for achieving her goals might look something like this:

Mission: Live a good life.

Goal: Successful career, good income.

Strategy: Obtain a college education.

Tactics: Select a college and a major; decide how to finance college.

Operations: Register, buy books, take courses, study.

E X A M P L E 1

ste24102_ch02_040-073.indd 46ste24102_ch02_040-073.indd 46 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

Chapter Two Competitiveness, Strategy, and Productivity 47

strategy in the early 2000s of offering discounts and rebates on a range of cars and SUVs, many of which were on low-margin vehicles. The strategy put a strain on profits, but custom- ers began to expect those incentives, and the companies maintained them to keep from losing additional market share.

On the other hand, Coach, the maker of leather handbags and purses, successfully changed its longtime strategy to grow its market by creating new products. Long known for its highly durable leather goods in a market where women typically owned few handbags, Coach cre- ated a new market for itself by changing women’s view of handbags by promoting “differ- ent handbags for different occasions” such as party bags, totes, clutches, wristlets, overnight bags, purses, and day bags. And Coach introduced many fashion styles and colors.

To formulate an effective strategy, senior managers must take into account the core com- petencies of the organizations, and they must scan the environment. They must determine what competitors are doing, or planning to do, and take that into account. They must criti- cally examine other factors that could have either positive or negative effects. This is some- times referred to as the SWOT approach (strengths, weaknesses, opportunities, and threats). Strengths and weaknesses have an internal focus and are typically evaluated by operations people. Threats and opportunities have an external focus and are typically evaluated by mar- keting people. SWOT is often regarded as the link between organizational strategy and opera- tions strategy.

SWOT  Analysis of strengths, weaknesses, opportunities, and threats.

TABLE 2.2 Examples of operations strategies Organization

Strategy Operations Strategy

Examples of Companies or Services

Low price Low cost U.S. first-class postage Walmart Southwest Airlines Responsiveness Short processing time McDonald’s restaurants Express Mail, UPS, FedEx One-hour photo On-time delivery Domino’s Pizza FedEx Differentiation: High quality

High-performance design and/or high-quality processing

Sony TV Lexus Disneyland Five-star restaurants or hotels

Consistent quality Coca-Cola, PepsiCo Wegmans Electrical power Differentiation: Newness

Innovation 3M, Apple Google

Differentiation: Variety

Flexibility Burger King (“Have it your way”) Hospital emergency room

Volume McDonald’s (“Buses welcome”) Toyota Supermarkets (additional checkouts) Differentiation: Service

Superior customer service Disneyland Amazon IBM Nordstrom

Differentiation: Location

Convenience

Supermarkets, dry cleaners Mall stores Service stations Banks, ATMs

ste24102_ch02_040-073.indd 47ste24102_ch02_040-073.indd 47 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

48 Chapter Two Competitiveness, Strategy, and Productivity

An alternative to SWOT analysis is Michael Porter’s five forces model, 1 which takes into account the threat of new competition, the threat of substitute products or services, the bargain- ing power of customers, the bargaining power of suppliers, and the intensity of competition.

In formulating a successful strategy, organizations must take into account both order quali- fiers and order winners. Order qualifiers are those characteristics that potential customers perceive as minimum standards of acceptability for a product to be considered for purchase. However, that may not be sufficient to get a potential customer to purchase from the organi- zation. Order winners are those characteristics of an organization’s goods or services that cause them to be perceived as better than the competition.

Characteristics such as price, delivery reliability, delivery speed, and quality can be order qualifiers or order winners. Thus, quality may be an order winner in some situations, but in others only an order qualifier. Over time, a characteristic that was once an order winner may become an order qualifier, and vice versa.

Obviously, it is important to determine the set of order qualifier characteristics and the set of order winner characteristics. It is also necessary to decide on the relative importance of each characteristic so that appropriate attention can be given to the various characteristics. Marketing must make that determination and communicate it to operations.

Environmental scanning is the monitoring of events and trends that present either threats or opportunities for the organization. Generally these include competitors’ activities; chang- ing consumer needs; legal, economic, political, and environmental issues; the potential for new markets; and the like.

Another key factor to consider when developing strategies is technological change, which can present real opportunities and threats to an organization. Technological changes occur in products (high-definition TV, improved computer chips, improved cellular telephone systems, and improved designs for earthquake-proof structures); in services (faster order processing, faster delivery); and in processes (robotics, automation, computer-assisted processing, point- of-sale scanners, and flexible manufacturing systems). The obvious benefit is a competitive edge; the risk is that incorrect choices, poor execution, and higher-than-expected operating costs will create competitive disadvantages.

Important factors may be internal or external. The following are key external factors:

1. Economic conditions. These include the general health and direction of the economy, inflation and deflation, interest rates, tax laws, and tariffs.

2. Political conditions. These include favorable or unfavorable attitudes toward business, political stability or instability, and wars.

3. Legal environment. This includes antitrust laws, government regulations, trade restric- tions, minimum wage laws, product liability laws and recent court experience, labor laws, and patents.

4. Technology. This can include the rate at which product innovations are occurring, current and future process technology (equipment, materials handling), and design technology.

5. Competition. This includes the number and strength of competitors, the basis of com- petition (price, quality, special features), and the ease of market entry.

6. Markets. This includes size, location, brand loyalties, ease of entry, potential for growth, long-term stability, and demographics.

The organization also must take into account various internal factors that relate to possible strengths or weaknesses. Among the key internal factors are the following:

1. Human resources. These include the skills and abilities of managers and workers, special talents (creativity, designing, problem solving), loyalty to the organization, expertise, dedication, and experience.

1Michael E. Porter, “The Five Competitive Forces That Shape Strategy,” Harvard Business Review 86, no. 1 (January 2008), pp. 78–93, 137.

Order qualifiers  Character- istics that customers perceive as minimum standards of accept- ability to be considered as a potential for purchase.

Order winners  Characteris- tics of an organization’s goods or services that cause it to be perceived as better than the competition.

Environmental scanning   The monitoring of events and trends that present threats or opportunities for a company.

ste24102_ch02_040-073.indd 48ste24102_ch02_040-073.indd 48 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

Chapter Two Competitiveness, Strategy, and Productivity 49

2. Facilities and equipment. Capacities, location, age, and cost to maintain or replace can have a significant impact on operations.

3. Financial resources. Cash flow, access to additional funding, existing debt burden, and cost of capital are important considerations.

4. Customers. Loyalty, existing relationships, and understanding of wants and needs are important.

5. Products and services. These include existing products and services, and the potential for new products and services.

6. Technology. This includes existing technology, the ability to integrate new technology, and the probable impact of technology on current and future operations.

7. Suppliers. Supplier relationships, dependability of suppliers, quality, flexibility, and service are typical considerations.

8. Other. Other factors include patents, labor relations, company or product image, dis- tribution channels, relationships with distributors, maintenance of facilities and equip- ment, access to resources, and access to markets.

After assessing internal and external factors and an organization’s distinctive competence, a strategy or strategies must be formulated that will give the organization the best chance of success. Among the types of questions that may need to be addressed are the following:

What role, if any, will the Internet play?

Will the organization have a global presence?

To what extent will outsourcing be used?

What will the supply chain management strategy be?

To what extent will new products or services be introduced?

What rate of growth is desirable and sustainable?

What emphasis, if any, should be placed on lean production?

How will the organization differentiate its products and/or services from competitors’?

The organization may decide to have a single, dominant strategy (e.g., be the price leader) or to have multiple strategies. A single strategy would allow the organization to concentrate on one particular strength or market condition. On the other hand, multiple strategies may be needed to address a particular set of conditions.

Many companies are increasing their use of outsourcing to reduce overhead, gain flexibil- ity, and take advantage of suppliers’ expertise. Dell Computers provides a great example of some of the potential benefits of outsourcing as part of a business strategy.

Growth is often a component of strategy, especially for new companies. A key aspect of this strategy is the need to seek a growth rate that is sustainable. In the 1990s, fast-food com- pany Boston Markets dazzled investors and fast-food consumers alike. Fueled by its success, it undertook rapid expansion. By the end of the decade, the company was nearly bankrupt; it had overexpanded. In 2000, it was absorbed by fast-food giant McDonald’s.

Companies increase their risk of failure not only by missing or incomplete strategies; they also fail due to poor execution of strategies. And sometimes they fail due to factors beyond their control, such as natural or man-made disasters, major political or economic changes, or competitors that have an overwhelming advantage (e.g., deep pockets, very low labor costs, less rigorous environmental requirements).

A useful resource on successful business strategies is the Profit Impact of Market Strategy (PIMS) database ( www.pimsonline.com ). The database contains profiles of over 3,000 busi- nesses located primarily in the United States, Canada, and western Europe. It is used by com- panies and academic institutions to guide strategic thinking. It allows subscribers to answer strategy questions about their business. Moreover, they can use it to generate benchmarks and develop successful strategies.

ste24102_ch02_040-073.indd 49ste24102_ch02_040-073.indd 49 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

50 Chapter Two Competitiveness, Strategy, and Productivity

According to the PIMS Web site,

The database is a collection of statistically documented experiences drawn from thousands of businesses, designed to help understand what kinds of strategies (e.g. quality, pricing, vertical integration, innovation, advertising) work best in what kinds of business environments. The data constitute a key resource for such critical management tasks as evaluating business performance, analyzing new business opportunities, evaluating and reality testing new strategies, and screening business portfolios. The primary role of the PIMS Program of the Strategic Planning Institute is to help managers understand and react to their business environment. PIMS does this by assisting managers as they develop and test strategies that will achieve an acceptable level of winning as defined by various strategies and financial measures.

Supply Chain Strategy A supply chain strategy specifies how the supply chain should function to achieve supply chain goals. The supply chain strategy should be aligned with the business strategy. If it is well executed, it can create value for the organization. It establishes how the organization should work with suppliers and policies relating to customer relationships and sustainability. Supply chain strategy is covered in more detail in a later chapter.

Sustainability Strategy Society is placing increasing emphasis on corporate sustainability practices in the form of governmental regulations and interest groups. For these and other reasons, business organiza- tions are or should be devoting attention to sustainability goals. To be successful, they will need a sustainability strategy. That requires elevating sustainability to the level of organiza- tional governance; formulating goals for products and services, for processes, and for the entire supply chain; measuring achievements and striving for improvements; and possibly linking executive compensation to the achievement of sustainability goals.

Global Strategy As globalization increased, many companies realized that strategic decisions with respect to globalization must be made. One issue companies must face is that what works in one country

In 1984, Michael Dell, then a college student, started selling personal computers from his dorm room. He didn’t have the resources to make computer components, so he let others do that, choosing instead to concentrate on selling the computers. And, unlike the major com- puter producers, he didn’t sell to dealers. Instead, he sold directly to PC buyers, eliminating some intermediaries, which allowed for lower cost and faster delivery. Although direct selling of PCs is fairly com- monplace now, in those days it was a major departure from the norm.

What did Dell do that was so different from the big guys? To start, he bought components from suppliers instead of making them. That gave him tremendous leverage. He had little inventory, no R&D expenditures, and relatively few employees. And the risks of this approach were spread among his suppliers. Suppliers were willing

to do this because Dell worked closely with them, and kept them informed. And because he was in direct contact with his custom- ers, he gained tremendous insight into their expectations and needs, which he communicated to his suppliers.

Having little inventory gave Dell several advantages over his competitors. Aside from the lower costs of inventory, when new, faster computer chips became available, there was little inventory to work off, so he was able to offer the newer models much sooner than competitors with larger inventories. Also, when the prices of various components dropped, as they frequently did, he was able to take advantage of the lower prices, which kept his average costs lower than competitors’.

Today the company is worth billions, and so is Michael Dell.

STRATEGY FORMULATION The key steps in strategy formulation are:

1. Link strategy directly to the organization’s mission or vision statement.

2. Assess strengths, weaknesses, threats and opportunities, and identify core competencies.

3. Identify order winners and order qualifiers. 4. Select one or two strategies (e.g., low cost, speed, customer ser-

vice) to focus on.

ste24102_ch02_040-073.indd 50ste24102_ch02_040-073.indd 50 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

Chapter Two Competitiveness, Strategy, and Productivity 51

or region will not necessarily work in another, and strategies must be carefully crafted to take these variabilities into account. Another issue is the threat of political or social upheaval. Still another issue is the difficulty of coordinating and managing far-flung operations. Indeed, “In today’s global markets, you don’t have to go abroad to experience international competition. Sooner or later the world comes to you.” 2

2.4 OPERATIONS STRATEGY The organization strategy provides the overall direction for the organization. It is broad in scope, covering the entire organization. Operations strategy is narrower in scope, deal- ing primarily with the operations aspect of the organization. Operations strategy relates to products, processes, methods, operating resources, quality, costs, lead times, and scheduling. Table  2.3 provides a comparison of an organization’s mission, its overall strategy, and its operations strategy, tactics, and operations.

In order for operations strategy to be truly effective, it is important to link it to organiza- tion strategy; that is, the two should not be formulated independently. Rather, formulation of organization strategy should take into account the realities of operations’ strengths and weak- nesses, capitalizing on strengths and dealing with weaknesses. Similarly, operations strategy must be consistent with the overall strategy of the organization, and with the other functional units of the organization. This requires that senior managers work with functional units to for- mulate strategies that will support, rather than conflict with, each other and the overall strat- egy of the organization. As obvious as this may seem, it doesn’t always happen in practice. Instead, we may find power struggles between various functional units. These struggles are detrimental to the organization because they pit functional units against each other rather than focusing their energy on making the organization more competitive and better able to serve the customer. Some of the latest approaches in organizations, involving teams of managers and workers, may reflect a growing awareness of the synergistic effects of working together rather than competing internally.

2Christopher A. Bartlett and Sumantra Ghoshal, “Going Global: Lessons from Late Movers,” Harvard Business Review, March–April 2000, p. 139.

LO2.4 Discuss and compare organization strategy and operations strategy and explain why it is important to link the two.

Operations strategy  The approach, consistent with the organization strategy, that is used to guide the operations function.

At this McDonald’s in Singapore, one variable is the use of rice as a staple of the Chinese diet. This ad highlights rice burgers.

ste24102_ch02_040-073.indd 51ste24102_ch02_040-073.indd 51 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

52 Chapter Two Competitiveness, Strategy, and Productivity

In the 1970s and early 1980s, operations strategy in the United States was often neglected in favor of marketing and financial strategies. That may have occurred because many chief executive officers did not come from operations backgrounds and perhaps did not fully appre- ciate the importance of the operations function. Mergers and acquisitions were common; lev- eraged buyouts were used, and conglomerates were formed that joined dissimilar operations. These did little to add value to the organization; they were purely financial in nature. Deci- sions were often made by individuals who were unfamiliar with the business, frequently to the detriment of that business. Meanwhile, foreign competitors began to fill the resulting vacuum with a careful focus on operations strategy.

In the late 1980s and early 1990s, many companies began to realize this approach was not working. They recognized that they were less competitive than other companies. This caused them to focus attention on operations strategy. A key element of both organization strategy and operations strategy is strategy formulation.

Operations strategy can have a major influence on the competitiveness of an organization. If it is well designed and well executed, there is a good chance that the organization will be successful; if it is not well designed or executed, the chances are much less that the organiza- tion will be successful.

Strategic Operations Management Decision Areas Operations management people play a strategic role in many strategic decisions in a business organization. Table 2.4 highlights some key decision areas. Notice that most of the decision areas have cost implications.

Two factors that tend to have universal strategic operations importance relate to quality and time. The following section discusses quality and time strategies.

TABLE 2.3 Comparison of mission, organization strategy, and operations strategy

Management Level

Time Horizon Scope

Level of Detail Relates to

The overall organization

Mission Top Long Broad Low Survival, profitability Strategy Senior Long Broad Low Growth rate, market share

Operations Strategic Senior Moderate to long

Broad Low Product design, choice of location, choice of technology, new facilities

Tactical Middle Moderate Moderate Moderate Employment levels, output levels, equipment selection, facility layout

Operational Low Short Narrow High Scheduling personnel, adjusting output rates, inventory management, purchasing

TABLE 2.4 Strategic operations management decisions

Decision Area What the Decisions Affect

1. Product and service design 2. Capacity 3. Process selection and layout 4. Work design 5. Location 6. Quality 7. Inventory 8. Maintenance 9. Scheduling 10. Supply chains 11. Projects

Costs, quality, liability and environmental issues Cost structure, flexibility Costs, flexibility, skill level needed, capacity Quality of work life, employee safety, productivity Costs, visibility Ability to meet or exceed customer expectations Costs, shortages Costs, equipment reliability, productivity Flexibility, efficiency Costs, quality, agility, shortages, vendor relations Costs, new products, services, or operating systems

ste24102_ch02_040-073.indd 52ste24102_ch02_040-073.indd 52 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

Chapter Two Competitiveness, Strategy, and Productivity 53

Quality and Time Strategies Traditional strategies of business organizations have tended to emphasize cost minimization or product differentiation. While not abandoning those strategies, many organizations have embraced strategies based on quality and/or time.

Quality-based strategies focus on maintaining or improving the quality of an organiza- tion’s products or services. Quality is generally a factor in both attracting and retaining cus- tomers. Quality-based strategies may be motivated by a variety of factors. They may reflect an effort to overcome an image of poor quality, a desire to catch up with the competition, a desire to maintain an existing image of high quality, or some combination of these and other factors. Interestingly enough, quality-based strategies can be part of another strategy such as cost reduction, increased productivity, or time, all of which benefit from higher quality.

Time-based strategies focus on reducing the time required to accomplish various activi- ties (e.g., develop new products or services and market them, respond to a change in cus- tomer demand, or deliver a product or perform a service). By doing so, organizations seek to improve service to the customer and to gain a competitive advantage over rivals who take more time to accomplish the same tasks.

Quality-based strategy  Strat- egy that focuses on quality in all phases of an organization.

Time-based strategy  Strategy that focuses on reduction of time needed to accomplish tasks.

LO2.5 Describe and give examples of time-based strategies.

Time-based strategies focus on reducing the time needed to conduct the various activities in a process. The rationale is that by reducing time, costs are generally less, productivity is higher, quality tends to be higher, product innovations appear on the market sooner, and cus- tomer service is improved.

Organizations have achieved time reduction in some of the following:

Planning time: The time needed to react to a competitive threat, to develop strategies and select tactics, to approve proposed changes to facilities, to adopt new technologies, and so on.

Product/service design time: The time needed to develop and market new or rede- signed products or services.

Processing time: The time needed to produce goods or provide services. This can involve scheduling, repairing equipment, methods used, inventories, quality, training, and the like.

Changeover time: The time needed to change from producing one type of product or service to another. This may involve new equipment settings and attachments, different methods, equipment, schedules, or materials.

Delivery time: The time needed to fill orders.

Response time for complaints: These might be customer complaints about quality, timing of deliveries, and incorrect shipments. These might also be complaints from employees about working conditions (e.g., safety, lighting, heat or cold), equipment problems, or quality problems.

It is essential for marketing and operations personnel to collaborate on strategy formulation in order to ensure that the buying criteria of the most important customers in each market segment are addressed.

fries, and soft drink. This enabled the counter staff to enter orders with a single keystroke instead of multiple keystrokes on their point-of-sale machines, reducing the time needed to take an order. That, in turn, enabled them to take orders more quickly, increasing productivity and, consequently, reducing labor requirements, which produced higher profits.

Source: Based on “Despite Pay Increases, Gains in Productivity, Profits Curb Inflation,” The Wall Street Journal, May 22, 1997, p. A1.

Wage increases can lead to inflationary pressure. They can cause the prices consumers pay for products and services to rise—unless, that is, they are offset by gains in productivity, which lead to an increase in profits. If that happens, a portion of the resulting profits can be used to cover the wage increases without having to raise prices.

Some Burger Kings were able to increase the starting pay of new workers by $1 by achieving productivity gains. The restaurants restruc- tured the menu, combining items into meal packages such as a burger,

READING Productivity Gains Curb Inflation

es reducing the time

ff of f f

ste24102_ch02_040-073.indd 53ste24102_ch02_040-073.indd 53 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

54 Chapter Two Competitiveness, Strategy, and Productivity

Agile operations is a strategic approach for competitive advantage that emphasizes the use of flexibility to adapt and prosper in an environment of change. Agility involves a blending of several distinct competencies such as cost, quality, and reliability along with flexibility. Processing aspects of flexibility include quick equipment changeovers, scheduling, and inno- vation. Product or service aspects include varying output volumes and product mix.

Successful agile operations requires careful planning to achieve a system that includes people, flexible equipment, and information technology. Reducing the time needed to perform work is one of the ways an organization can improve a key metric: productivity.

2.5 IMPLICATIONS OF ORGANIZATION STRATEGY FOR OPERATIONS MANAGEMENT

Organization strategy has a major impact on operations and supply chain management strate- gies. For example, organizations that use a low-cost, high-volume strategy limit the amount of variety offered to customers. As a result, variations for operations and the supply chain are minimal, so they are easier to deal with. Conversely, a strategy to offer a wide variety of products or services, or to perform customized work, creates substantial operational and supply chain variations and, hence, more challenges in achieving a smooth flow of goods and services throughout the supply chain, thus making the matching of supply to demand more difficult. Similarly, increasing service reduces the ability to compete on price. Table 2.5 provides a brief overview of variety and some other key implications.

2.6 TRANSFORMING STRATEGY INTO ACTION: THE BALANCED SCORECARD

The Balanced Scorecard (BSC) is a top-down management system that organizations can use to clarify their vision and strategy and transform them into action. It was introduced in the early 1990s by Robert Kaplan and David Norton, 3 and it has been revised and improved

3Robert S. Kaplan and David P. Norton, Balanced Scorecard: Translating Strategy into Action (Cambridge, MA: Harvard Business School Press, 1996).

TABLE 2.5 Organization strategies and their implications for operations management

Organization Strategy Implications for Operations Management

Low price Requires low variation in products/services and a high-volume, steady flow of goods results in maximum use of resources through the system. Standardized work, material, and inventory requirements.

High quality Entails higher initial cost for product and service design, and process design, and more emphasis on assuring supplier quality.

Quick response Requires flexibility, extra capacity, and higher levels of some inventory items.

Newness/innovation Entails large investment in research and development for new or improved products and services plus the need to adapt operations and supply processes to suit new products or services.

Product or service variety Requires high variation in resource and more emphasis on product and service design; higher worker skills needed, cost estimation more difficult; scheduling more complex; quality assurance more involved; inventory management more complex; and matching supply to demand more difficult.

Sustainability Affects location planning, product and service design, process design, outsourcing decisions, returns policies, and waste management.

ste24102_ch02_040-073.indd 54ste24102_ch02_040-073.indd 54 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

Chapter Two Competitiveness, Strategy, and Productivity 55

since then. The idea was to move away from a purely financial perspective of the organization and integrate other perspectives such as customers, internal business processes, and learn- ing and growth. Using this approach, managers develop objectives, metrics, and targets for each objective and initiatives to achieve objectives, and they identify links among the vari- ous perspectives. Results are monitored and used to improve strategic performance results. Figure 2.2 illustrates the conceptual framework of this approach. Many organizations employ this or a similar approach.

As seen in Figure  2.2 , the four perspectives are intended to balance not only financial and nonfinancial performance, but also internal and external performance as well as past and future performance. This approach can also help organizations focus on how they differ from the competition in each of the four areas if their vision is realized. Table 2.6 has some exam- ples of factors for key focal points.

Although the Balanced Scorecard helps focus managers’ attention on strategic issues and the implementation of strategy, it is important to note that it has no role in strategy formulation.

FIGURE 2.2 The Balanced Scorecard Source: Reprinted with permission of Harvard Business School Press from Rob- ert Kaplan and David Norton, Balanced Scorecard: Translating Strategy into Action. Copyright © 1996 by the Harvard Business School Publishing Corporation. All rights reserved.

Financial

"To succeed financially, how should we appear to our shareholders?"

O b

je ct

iv es

M ea

su re

s Ta

rg et

s In

it ia

ti ve

s

Learning and Growth "To achieve our vision, how will we sustain our ability to change and improve?"

O b

je ct

iv es

M ea

su re

s Ta

rg et

s In

it ia

ti ve

s

Internal Business Processes

Vision and strategy

"To satisfy our shareholders and customers, what business processes must we excel at?"

O b

je ct

iv es

M ea

su re

s Ta

rg et

s In

it ia

ti ve

s

Customer

"To achieve our vision, how should we appear to our customers?"

O b

je ct

iv es

M ea

su re

s Ta

rg et

s In

it ia

ti ve

s

A major key to Apple’s continued success is its ability to keep pushing the boundaries of innovation. Apple has demonstrated how to create growth by dreaming up products so new and ingenious that they have upended one industry after another.

ste24102_ch02_040-073.indd 55ste24102_ch02_040-073.indd 55 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

56 Chapter Two Competitiveness, Strategy, and Productivity

Moreover, this approach pays little attention to suppliers and government regulations, and community, environmental, and sustainability issues are missing. These are closely linked, and business organizations need to be aware of the impact they are having in these areas and respond accordingly. Otherwise, organizations may be subject to attack by pressure groups and risk damage to their reputation.

2.7 PRODUCTIVITY One of the primary responsibilities of a manager is to achieve productive use of an organiza- tion’s resources. The term productivity is used to describe this. Productivity is an index that measures output (goods and services) relative to the input (labor, materials, energy, and other resources) used to produce it. It is usually expressed as the ratio of output to input:

Productivity Output

Input � (2–1)

Although productivity is important for all business organizations, it is particularly impor- tant for organizations that use a strategy of low cost, because the higher the productivity, the lower the cost of the output.

A productivity ratio can be computed for a single operation, a department, an organiza- tion, or an entire country. In business organizations, productivity ratios are used for planning workforce requirements, scheduling equipment, financial analysis, and other important tasks.

Productivity has important implications for business organizations and for entire nations. For nonprofit organizations, higher productivity means lower costs; for profit-based organiza- tions, productivity is an important factor in determining how competitive a company is. For a nation, the rate of productivity growth is of great importance. Productivity growth is the increase in productivity from one period to the next relative to the productivity in the preced- ing period. Thus,

Productivity growth Current productivity Previous productivity

Previous productivity 100�

� � (2–2)

For example, if productivity increased from 80 to 84, the growth rate would be

84 80

80 100 5%

� � �

LO2.6 Define the term productivity and explain why it is important to companies and to countries.

Productivity  A measure of the effective use of resources, usually expressed as the ratio of output to input.

TABLE 2.6 Balanced scorecard factors examples

Focal Point Factors

Suppliers Delivery performance Quality performance

Number of suppliers Supplier locations

Duplicate activities

Internal Processes Bottlenecks Automation potential

Turnover

Employees Job satisfaction Learning opportunities

Delivery performance

Customers Quality performance Satisfaction Retention rate

ste24102_ch02_040-073.indd 56ste24102_ch02_040-073.indd 56 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

Chapter Two Competitiveness, Strategy, and Productivity 57

Productivity growth is a key factor in a country’s rate of inflation and the standard of living of its people. Productivity increases add value to the economy while keeping inflation in check. Productivity growth was a major factor in the long period of sustained economic growth in the United States in the 1990s.

Computing Productivity Productivity measures can be based on a single input (partial productivity), on more than one input (multifactor productivity), or on all inputs (total productivity). Table 2.7 lists some examples of productivity measures. The choice of productivity measure depends primarily on the purpose of the measurement. If the purpose is to track improvements in labor productivity, then labor becomes the obvious input measure.

Partial measures are often of greatest use in operations management. Table 2.8 provides some examples of partial productivity measures.

The units of output used in productivity measures depend on the type of job performed. The following are examples of labor productivity:

Yards of carpet installed

Labor hours Yards of carpet installed per labor hour

Number of motel rooms cleaned

Number of workers Number of motel rooms cleaned per worker

Productivity can be enhanced by the use of robotic equipment. Robots can operate for long periods with consistent precision and high speed. The Hyundai Motor Company manufacturing plant in Montgomery, Alabama, uses robots for assembly work. This $1.4 billion automotive plant is one of the most advanced assembly plants in North America.

Partial measures Output Labor

Output Machine

Output Capital

Output Energy

Multifactor measures Output

Labor Machine�

Output Labor Capital Energy� �

Total measure Goods or services produced

All inputs used to produce them

TABLE 2.7 Some examples of different types of productivity measures

ste24102_ch02_040-073.indd 57ste24102_ch02_040-073.indd 57 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

58 Chapter Two Competitiveness, Strategy, and Productivity

Similar examples can be listed for machine productivity (e.g., the number of pieces per hour turned out by a machine).

e celx mhhe.com/stevenson12e

Labor productivity Units of output per labor hour Units of output per shift Value-added per labor hour Dollar value of output per labor hour

Machine productivity Units of output per machine hour Dollar value of output per machine hour

Capital productivity Units of output per dollar input Dollar value of output per dollar input

Energy productivity Units of output per kilowatt-hour Dollar value of output per kilowatt-hour

TABLE 2.8 Some examples of partial productivity measures

Determine the productivity for these cases:

a. Four workers installed 720 square yards of carpeting in eight hours.

b. A machine produced 70 pieces in two hours. However, two pieces were unusable.

E X A M P L E 2

S O L U T I O N a.

720 square yards

4 workers 8 hours/worker

720 yards

32 hours 22.5 yards / hour

� �

Productivity Yards of carpet installed

Labor hours worked �

b.

70 2 68 usable pieces

2 hours 34 pieces/ hour

� � �

Productivity Usable pieces

Production time �

Calculations of multifactor productivity measure inputs and outputs using a common unit of measurement, such as cost. For instance, the measure might use cost of inputs and units of the output:

Quantity of production

Labor cost Materials cost Overhead� � (2–3)

Note: The unit of measure must be the same for all factors in the denominator.

e celx mhhe.com/stevenson12e

Determine the multifactor productivity for the combined input of labor and machine time using the following data:

Output: 7,040 units Input

Labor: $1,000

Materials: $520

Overhead: $2,000

E X A M P L E 3

ste24102_ch02_040-073.indd 58ste24102_ch02_040-073.indd 58 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

Chapter Two Competitiveness, Strategy, and Productivity 59

Productivity measures are useful on a number of levels. For an individual department or organization, productivity measures can be used to track performance over time. This allows managers to judge performance and to decide where improvements are needed. For example, if productivity has slipped in a certain area, operations staff can examine the factors used to compute productivity to determine what has changed and then devise a means of improving productivity in subsequent periods.

Productivity measures also can be used to judge the performance of an entire industry or the productivity of a country as a whole. These productivity measures are aggregate measures.

In essence, productivity measurements serve as scorecards of the effective use of resources. Business leaders are concerned with productivity as it relates to competitiveness: If two firms both have the same level of output but one requires less input because of higher productivity, that one will be able to charge a lower price and consequently increase its share of the mar- ket. Or that firm might elect to charge the same price, thereby reaping a greater profit. Gov- ernment leaders are concerned with national productivity because of the close relationship between productivity and a nation’s standard of living. High levels of productivity are largely responsible for the relatively high standards of living enjoyed by people in industrial nations. Furthermore, wage and price increases not accompanied by productivity increases tend to cre- ate inflationary pressures on a nation’s economy.

Advantages of domestic-based operations for domestic markets often include higher worker productivity, better control of quality, avoidance of intellectual property losses, lower shipping costs, political stability, low inflation, and faster delivery.

S O L U T I O N Multifactor productivity Output Labor Materials Overhead

� � �

7,040 units

$1,000 $520 $2,000 2 units per dollar input�

� � �

Productivity in the Service Sector Service productivity is more problematic than manufacturing productivity. In many situations, it is more difficult to measure, and thus to manage, because it involves intellectual activities and a high degree of variability. Think about medical diagnoses, surgery, consulting, legal services, customer service, and computer repair work. This makes productivity improvements

productivity, they can afford to undercut competi- tors’ prices to gain market share or charge the same prices but realize greater profits! For an industry, higher relative productivity means it is less likely to be supplanted by foreign industry.

Questions 1. Why is high productivity important for a nation? 2. Why do you suppose that service jobs have lower productivity than

manufacturing jobs? 3. How can a company gain a competitive advantage by having higher

productivity than its competitors have?

It is sometimes easy to overlook the importance of productivity. National figures are often reported in the media. They may seem to be ho-hum; there’s nothing glamorous about them to get our attention. But make no mistake; they are key economic indicators—barometers, if you will, that affect everybody. How? High productivity and high standard of living go hand-in-hand. If a country becomes more service-based, as the United States has become, some (but not all) high-productivity manufacturing jobs are replaced by lower-productivity service jobs. That makes it more difficult to support a high standard of living.

Productivity levels are also important for industries and compa- nies. For companies, a higher productivity relative to their competitors gives them a competitive advantage in the marketplace. With a higher

READING Why Productivity Matters

dustry higher relative

i- he

ste24102_ch02_040-073.indd 59ste24102_ch02_040-073.indd 59 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

60 Chapter Two Competitiveness, Strategy, and Productivity

Factors That Affect Productivity Numerous factors affect productivity. Generally, they are methods, capital, quality, technol- ogy, and management.

A commonly held misconception is that workers are the main determinant of productivity. According to that theory, the route to productivity gains involves getting employees to work harder. However, the fact is that many productivity gains in the past have come from techno- logical improvements. Familiar examples include

However, technology alone won’t guarantee productivity gains; it must be used wisely and thoughtfully. Without careful planning, technology can actually reduce productivity, espe- cially if it leads to inflexibility, high costs, or mismatched operations. Another current produc- tivity pitfall results from employees’ use of computers or smart phones for nonwork-related activities (playing games or checking stock prices or sports scores on the Internet or smart phones, and texting friends and relatives). Beyond all of these is the dip in productivity that results while employees learn to use new equipment or procedures that will eventually lead to productivity gains after the learning phase ends.

LO2.7 Describe several factors that affect productivity.

Fax machines Automation GPS devices Copiers Calculators Smart phones The Internet, search engines Computers Apps Voice mail, cellular phones E-mail 3-D printing Software Medical imaging

more difficult to achieve. Nonetheless, because service is becoming an increasingly large por- tion of our economy, the issues related to service productivity will have to be dealt with. It is interesting to note that government statistics normally do not include service firms.

A useful measure closely related to productivity is process yield. Where products are involved, process yield is defined as the ratio of output of good product (i.e., defective product is not included) to the quantity of raw material input. Where services are involved, process yield measurement is often dependent on the particular process. For example, in a car rental agency, a measure of yield is the ratio of cars rented to cars available for a given day. In educa- tion, a measure for college and university admission yield is the ratio of student acceptances to the total number of students approved for admission. For subscription services, yield is the ratio of new subscriptions to the number of calls made or the number of letters mailed. However, not all services lend themselves to a simple yield measurement. For example, services such as automotive, appliance, and computer repair don’t readily lend themselves to such measures.

many farmers in other countries do. That enables Dutch growers to more closely match supply with supermarket demand. Finally, the Dutch tomato has been engineered to achieve a firmness that allows growers to harvest and ship tomatoes at their peak, while the “outdoor” farmers typically need to harvest their tomatoes before they are fully ripe to allow for firmness during shipping.

Questions 1. What factors enable Dutch tomato growers to achieve much higher

productivity than the Italian and Greek growers? 2. Discuss the importance of the Dutch growers’ supply chain.

Source: Based on “Tomato,” Time, March 25, 2013, pp. 9–14.

Tomato growers in the Netherlands have a huge productivity advantage over their competitors in Italy and Greece. Although those countries are sun drenched while the Netherlands are anything but, computerized, climate-controlled greenhouses, and a “soil” spun from basalt and chalk that resembles cotton candy, allows for precise control of humidity and nutrition, and enables growers to produce their crops year around. Grow- ers in Italy and Greece generally grow their crops outdoors or in unheated greenhouses, and can only manage two crops a year. Dutch growers are able to achieve yields that are about ten times per square yard of those of Italian and Greek growers. And the Dutch have a supply chain advantage: an integrated Dutch trading company works closely with supermarket chains in Europe and suppliers around the world, so farmers are able to sell their output in high volume, rather than locally the way

READING Dutch Tomato Growers’ Productivity Advantage

as been engineered to

es th

ste24102_ch02_040-073.indd 60ste24102_ch02_040-073.indd 60 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

Chapter Two Competitiveness, Strategy, and Productivity 61

Other factors that affect productivity include the following:

Standardizing processes and procedures wherever possible to reduce variability can have a significant benefit for both productivity and quality.

Quality differences may distort productivity measurements. One way this can happen is when comparisons are made over time, such as comparing the productivity of a fac- tory now with one 30 years ago. Quality is now much higher than it was then, but there is no simple way to incorporate quality improvements into productivity measurements.

Use of the Internet can lower costs of a wide range of transactions, thereby increasing productivity. It is likely that this effect will continue to increase productivity in the fore- seeable future.

Computer viruses can have an immense negative impact on productivity.

Searching for lost or misplaced items wastes time, hence negatively affecting productivity.

Scrap rates have an adverse effect on productivity, signaling inefficient use of resources.

New workers tend to have lower productivity than seasoned workers. Thus, growing companies may experience a productivity lag.

Safety should be addressed. Accidents can take a toll on productivity.

A shortage of technology-savvy workers hampers the ability of companies to update com- puting resources, generate and sustain growth, and take advantage of new opportunities.

Layoffs often affect productivity. The effect can be positive and negative. Initially, pro- ductivity may increase after a layoff, because the workload remains the same but fewer workers do the work—although they have to work harder and longer to do it. However, as time goes by, the remaining workers may experience an increased risk of burnout, and they may fear additional job cuts. The most capable workers may decide to leave.

Labor turnover has a negative effect on productivity; replacements need time to get up to speed.

Design of the workspace can impact productivity. For example, having tools and other work items within easy reach can positively impact productivity.

Incentive plans that reward productivity increases can boost productivity.

And there are still other factors that affect productivity, such as equipment breakdowns and shortages of parts or materials. The education level and training of workers and their health can greatly affect productivity. The opportunity to obtain lower costs due to higher productiv- ity elsewhere is a key reason many organizations turn to outsourcing. Hence, an alternative to outsourcing can be improved productivity. Moreover, as a part of their strategy for quality, the best organizations strive for continuous improvement. Productivity improvements can be an important aspect of that approach.

Improving Productivity A company or a department can take a number of key steps toward improving productivity:

1. Develop productivity measures for all operations. Measurement is the first step in man- aging and controlling an operation.

2. Look at the system as a whole in deciding which operations are most critical. It is overall productivity that is important. Managers need to reflect on the value of potential pro- ductivity improvements before okaying improvement efforts. The issue is effectiveness. There are several aspects of this. One is to make sure the result will be something custom- ers want. For example, if a company is able to increase its output through productivity improvements, but then is unable to sell the increased output, the increase in productiv- ity isn’t effective. Second, it is important to adopt a systems viewpoint: A productivity increase in one part of an operation that doesn’t increase the productivity of the system would not be effective. For example, suppose a system consists of a sequence of two operations, where the output of the first operation is the input to the second operation, and

ste24102_ch02_040-073.indd 61ste24102_ch02_040-073.indd 61 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

62 Chapter Two Competitiveness, Strategy, and Productivity

each operation can complete its part of the process at a rate of 20 units per hour. If the productivity of the first operation is increased, but the productivity of the second opera- tion is not, the output of the system will still be 20 units per hour.

3. Develop methods for achieving productivity improvements, such as soliciting ideas from workers (perhaps organizing teams of workers, engineers, and managers), studying how other firms have increased productivity, and reexamining the way work is done.

4. Establish reasonable goals for improvement.

5. Make it clear that management supports and encourages productivity improvement. Consider incentives to reward workers for contributions.

6. Measure improvements and publicize them.

Don’t confuse productivity with efficiency. Efficiency is a narrower concept that pertains to getting the most out of a fixed set of resources; productivity is a broader concept that pertains to effective use of overall resources. For example, an efficiency perspective on mowing a lawn given a hand mower would focus on the best way to use the hand mower; a productivity per- spective would include the possibility of using a power mower.

Competition is the driving force in many organizations. It may involve price, quality, special features or services, time, or other factors. To develop effective strategies for business, it is essential for organiza- tions to determine what combinations of factors are important to customers, which factors are order qualifiers, and which are order winners.

It is essential that goals and strategies be aligned with the organization’s mission. Strategies are plans for achieving organizational goals. They provide focus for decision making. Strategies must take into account present and future customer wants, as well as the organization’s strengths and weaknesses, threats and opportunities. These can run the gamut from what competitors are doing, or are likely to do, to technology, supply chain management, and e-business. Organizations generally have overall strate- gies that pertain to the entire organization and strategies that pertain to each of the functional areas. Functional strategies are narrower in scope and should be linked to overall strategies. Time-based strat- egies and quality-based strategies are among the most widely used strategies business organizations employ to serve their customers and to become more productive. The chapter includes a description of the Balanced Scorecard approach, which can be helpful for transforming strategies into actions, and the implications of organization strategy for operations management.

Productivity is a measure of the use of resources. There is considerable interest in productivity both from an organizational standpoint and from a national standpoint. Business organizations want higher productivity because it yields lower costs and helps them to become more competitive. Nations want higher productivity because it makes their goods and services more attractive, offsets inflationary pres- sures associated with higher wages, and results in a higher standard of living for their people.

SUMMARY

1. Competitive pressure often means that business organizations must frequently assess their competi- tors’ strengths and weaknesses, as well as their own, to remain competitive.

2. Strategy formulation is critical because strategies provide direction for the organization, so they can play a role in the success or failure of a business organization.

KEY POINTS

devices through a clean room and the total time spent blister sealing devices was lowered. Within a short time, productivity nearly doubled from 36 devices per hour to 60 devices per hour, work-in-progress inventory fell, and a 10 percent reduction in the standard cost of product was achieved.

Source: Based on Lauraine Howley, “A Strategy for Company Improvement,” Medical Device Technology 11, no. 2 (March 2000), p. 33.

Stryker Howmedica set up a team to improve the running of its packag- ing line. A strategy focus on productivity improvement was used. The team adopted an approach based on the production system of Toyota. The goal was to satisfy the customer expectations for delivery and qual- ity, while achieving gains in productivity. After the team identified needs and set objectives, a number of improvements were implemented. A one-piece flow was established that reduced bottlenecks in the flow of

READING Productivity Improvement

6 devices per hour to

e n

ste24102_ch02_040-073.indd 62ste24102_ch02_040-073.indd 62 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

Chapter Two Competitiveness, Strategy, and Productivity 63

competitiveness, 42 core competencies, 46 environmental scanning, 48 goals, 44 mission, 44

mission statement, 44 operations strategy, 51 order qualifiers, 48 order winners, 48 productivity, 56

quality-based strategy, 53 strategies, 44 SWOT, 47 tactics, 45 time-based strategy, 53

KEY TERMS

SOLVED PROBLEMS

A company that processes fruits and vegetables is able to produce 400 cases of canned peaches in one-half hour with four workers. What is labor productivity?

Problem 1 e celx

mhhe.com/stevenson12e

Solution

200 cases per labor hour�

Labor productivity Quantity produced

Labor hours

400 cases

4 workers 1/2hour /worker � �

Problem 2 A wrapping-paper company produced 2,000 rolls of paper one day. Labor cost was $160, material cost was $50, and overhead was $320. Determine the multifactor productivity.

3. Functional strategies and supply chain strategies need to be aligned with the goals and strategies of the overall organization.

4. The three primary business strategies are low cost, responsiveness, and differentiation.

5. Productivity is a key factor in the cost of goods and services. Increases in productivity can become a competitive advantage.

6. High productivity is particularly important for organizations that have a strategy of low costs.

Solution

2,000 rolls

$160 $50 $320 3.77 rolls per dollar input�

� � �

Multifactor productivity Quantity produced

Labor cost Material cost Overhead �

� �

A variation of the multifactor productivity calculation incorporates the standard price in the numera- tor by multiplying the units by the standard price.

Problem 3 Compute the multifactor productivity measure for an eight-hour day in which the usable output was 300 units, produced by three workers who used 600 pounds of materials. Workers have an hourly wage of $20, and material cost is $1 per pound. Overhead is 1.5 times labor cost.

Solution

300 units (3 workers 8 hours $20 /hour) (600 pounds $1/ pound)

(3 workers 8 hours $20 /hour 1.50)

300 units

$480 $600 $720 .167 units of output per dollar of input

� � � � � �

� � �

� � �

Multifactor productivity Usable output

Labor cost Material cost Overhead cost �

� �

e celx mhhe.com/stevenson12e

e celx mhhe.com/stevenson12e

ste24102_ch02_040-073.indd 63ste24102_ch02_040-073.indd 63 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

64 Chapter Two Competitiveness, Strategy, and Productivity

Problem 4 A health club has two employees who work on lead generation. Each employee works 40 hours a week, and is paid $20 an hour. Each employee identifies an average of 400 possible leads a week from a list of 8,000 names. Approximately 10 percent of the leads become members and pay a one- time fee of $100. Material costs are $130 per week, and overhead costs are $1,000 per week. Calcu- late the multifactor productivity for this operation in fees generated per dollar of input.

Solution MFP

(Possible leads)(No. of workers)(Fee)(Conversion percentage)

Labor cost Material cost Overhead cost �

� �

(400)(2)($100)(.10)

2(40)($20) $130 $1,000

$8,000

$2,730 2.93�

� � � �

1. From time to time, various groups clamor for import restrictions or tariffs on foreign-produced goods, particularly automobiles. How might these be helpful? Harmful?

2. List the key ways that organizations compete.

3. Explain the importance of identifying and differentiating order qualifiers and order winners.

4. Select two stores you shop at, and state how they compete.

5. What is the Balanced Scorecard and how is it useful?

6. Contrast the terms strategies and tactics.

7. Contrast organization strategy and operations strategy.

8. Explain the term time-based strategies and give three examples.

9. Productivity should be a concern of every business organization. a. How is productivity defined? b. How are productivity measures used? c. Why is productivity important? d. What part of the organization has primary responsibility for productivity? e. How is efficiency different from productivity?

10. List some factors that can affect productivity and some ways that productivity can be improved.

11. It has been said that a typical Japanese automobile manufacturer produces more cars with fewer workers than its U.S. counterpart. What are some possible explanations for this, assuming that U.S. workers are as hardworking as Japanese workers?

12. Boeing’s strategy appears to focus on its 777 midsize plane’s ability to fly into smaller, nonhub airports. Rival European Airbus’s strategy appears to focus on large planes. Compare the advan- tages and disadvantages of these two strategies.

13. Name 10 ways that banks compete for customers.

14. Explain the rationale of an operations strategy that seeks to increase the opportunity for use of technology by reducing variability in processing requirements.

15. Identify two companies that have time-based strategies, and two that have quality-based strategies.

DISCUSSION AND REVIEW QUESTIONS

1. Who needs to be involved in formulating organizational strategy?

2. Name some of the competitive trade-offs that might arise in a fast-food restaurant.

3. How can technology improve a. Competitiveness? b. Productivity?

TAKING STOCK

e celx mhhe.com/stevenson12e

ste24102_ch02_040-073.indd 64ste24102_ch02_040-073.indd 64 11/29/13 1:02 AM11/29/13 1:02 AM

Final PDF to printer

Chapter Two Competitiveness, Strategy, and Productivity 65

1. In the past there was concern about a “productivity paradox” related to IT services. More recently, there have been few references to this phenomenon. Using the Internet, explain the term “productiv- ity paradox.” Why do you think that the discussion of that topic has faded?

2. A U.S. company has two manufacturing plants, one in the United States and one in another country. Both produce the same item, each for sale in their respective countries. However, their productivity figures are quite different. The analyst thinks this is because the U.S. plant uses more automated equipment for processing while the other plant uses a higher percentage of labor. Explain how that factor can cause productivity figures to be misleading. Is there another way to compare the two plants that would be more meaningful?

3. While it is true that increases in efficiency generate productivity increases, it is possible to get caught in an “efficiency improvement trap.” Explain what this means.

4. It is common knowledge that Sam’s boss Dom has been fudging the weekly productivity figures. Several employees, including Sam, have spoken to him about this, but he continues to do it. Sam has observed a drop in morale among his coworkers due to this. Sam is thinking about sending an anonymous note to Dom’s boss. Would that be ethical? What would you do if you were Sam?

5. Give two examples of what would be considered unethical involving competition and the ethical principles (see Chapter 1) that would be violated.

CRITICAL THINKING

EXERCISES

1. A catering company prepared and served 300 meals at an anniversary celebration last week using eight workers. The week before, six workers prepared and served 240 meals at a wedding reception. a. For which event was the labor productivity higher? Explain. b. What are some possible reasons for the productivity differences?

2. The manager of a crew that installs carpeting has tracked the crew’s output over the past several weeks, obtaining these figures:

Compute the labor productivity for each of the weeks. On the basis of your calculations, what can you conclude about crew size and productivity?

3. Compute the multifactor productivity measure for each of the weeks shown for production of choc- olate bars. What do the productivity figures suggest? Assume 40-hour weeks and an hourly wage of $12. Overhead is 1.5 times weekly labor cost. Material cost is $6 per pound.

4. A company that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labor content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used five workers, who produced an average of 80 carts per hour. Workers receive $10 per hour, and machine cost was $40 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $10 per hour while output increased by four carts per hour. a. Compute labor productivity under each system. Use carts per worker per hour as the measure of

labor productivity. b. Compute the multifactor productivity under each system. Use carts per dollar cost (labor plus

equipment) as the measure. c. Comment on the changes in productivity according to the two measures, and on which one you

believe is the more pertinent for this situation.

PROBLEMS

Week Output (units) Workers Material (lbs)

1 30,000 6 450

2 33,600 7 470

3 32,200 7 460

4 35,400 8 480

Week Crew Size Yards Installed

1 4 96

2 3 72

3 4 92

4 2 50

5 3 69

6 2 52

ste24102_ch02_040-073.indd 65ste24102_ch02_040-073.indd 65 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

66 Chapter Two Competitiveness, Strategy, and Productivity

5. An operation has a 10 percent scrap rate. As a result, 72 pieces per hour are produced. What is the potential increase in labor productivity that could be achieved by eliminating the scrap?

6. A manager checked production records and found that a worker produced 160 units while working 40 hours. In the previous week, the same worker produced 138 units while working 36 hours. Did the worker’s productivity increase, decrease, or remain the same? Explain.

7. The following table shows data on the average number of customers processed by several bank service units each day. The hourly wage rate is $25, the overhead rate is 1.0 times labor cost, and material cost is $5 per customer.

a. Compute the labor productivity and the multifactor productivity for each unit. Use an eight-hour day for multifactor productivity.

b. Suppose a new, more standardized procedure is to be introduced that will enable each employee to process one additional customer per day. Compute the expected labor and multifactor produc- tivity rates for each unit.

8. A property title search firm is contemplating using online software to increase its search productiv- ity. Currently an average of 40 minutes is needed to do a title search. The researcher cost is $2 per minute. Clients are charged a fee of $400. Company A’s software would reduce the average search time by 10 minutes, at a cost of $3.50 per search. Company B’s software would reduce the average search time by 12 minutes at a cost of $3.60 per search. Which option would have the higher pro- ductivity in terms of revenue per dollar of input?

9. A company offers ID theft protection using leads obtained from client banks. Three employees work 40 hours a week on the leads, at a pay rate of $25 per hour per employee. Each employee identifies an average of 3,000 potential leads a week from a list of 5,000. An average of 4 percent actually sign up for the service, paying a one-time fee of $70. Material costs are $1,000 per week, and overhead costs are $9,000 per week. Calculate the multifactor productivity for this operation in fees generated per dollar of input.

Unit Employees Customers

Processed/Day

A 4 36

B 5 40

C 8 60

D 3 20

Zachary Schiller The Rust Belt is back. So say bullish observers as U.S. exports surge, long-moribund industries glow with newfound profits, and unemploy- ment dips to lows not seen in a decade. But in the smokestack citadels, there’s disquiet. Too many machine-tool and auto parts factories are silent; too many U.S. industries still can’t hold their own.

What went wrong since the heyday of the 1960s? That’s the issue Max Holland, a contributing editor of The Nation, takes up in his nutsy- boltsy but fascinating study, When the Machine Stopped.*

The focus of the story is Burgmaster Corp., a Los Angeles–area machine-tool maker founded in 1944 by Czechoslovakian immigrant Fred Burg. Holland’s father worked there for 29 years, and the author interviewed 22 former employees. His shop-floor view of this small

company is a refreshing change from academic treatises on why America can’t compete.

The discussions of spindles and numerical control can be tough going. But Holland compensates by conveying the excitement and inno- vation of the company’s early days and the disgust and cynicism accom- panying its decline. Moreover, the fate of Burgmaster and its brethren is crucial to the U.S. industrial economy: Any manufactured item is either made by a machine tool or by a machine made by a machine tool.

Producing innovative turret drills used in a wide variety of metal working tasks, Burgmaster was a thriving enterprise by 1965, when annual sales amounted to about $8 million. The company needed backing to expand, however, so it sold out to Buffalo-based conglom- erate Houdaille Industries Inc. Houdaille was in turn purchased in a 1979 leveraged buyout (LBO) led by Kohlberg Kravis Roberts & Co. By 1982, when debt, competition, and a sickly machine-tool market had

CASE An American Tragedy: How a Good Company Died

(continued) *Max Holland, When the Machine Stopped: A Contemporary Tale from Industrial America (Boston: Harvard Business School Press, 1988).

ste24102_ch02_040-073.indd 66ste24102_ch02_040-073.indd 66 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

Chapter Two Competitiveness, Strategy, and Productivity 67

battered Burgmaster badly, Houdaille went to Washington with a peti- tion to withhold the investment tax credit for certain Japanese-made machine tools.

Thanks to deft lobbying, the Senate passed a resolution supporting Houdaille’s position, but President Reagan refused to go along. Houdai- lle’s subsequent attempt to link Burgmaster up with a Japanese rival also failed, and Burgmaster was closed.

Holland uses Burgmaster’s demise to explore some key issues of economic and trade policy. Houdaille’s charge that a cartel led by the Japanese government had injured U.S. toolmakers, for example, became a rallying point for those who would blame a fearsome Japan Inc. for the problems of U.S. industry.

Holland describes the Washington wrangling over Houdaille in painful detail. But he does show that such government decisions are often made without much knowledge of what’s going on in industry. He shows, too, that Japanese producers succeeded less because of gov- ernment help than because they made better, cheaper machines.

For those who see LBOs as a symptom of what ails the U.S. econ- omy, Holland offers plenty of ammunition. He argues persuasively that the LBO crippled Burgmaster by creating enormous pressure to gener- ate cash. As Burgmaster pushed its products out as fast as possible, he writes, it routinely shipped defective machines. It promised customers features that engineers hadn’t yet designed. And although KKR disputes the claim, Holland concludes that the LBO choked off Burgmaster’s investment funds just when foreign competition made them most nec- essary. As for Houdaille, it was recapitalized and sold to Britain’s Tube Investments Group.

But Burgmaster’s problems had started even before the LBO. Hol- land’s history of the company under Houdaille is a veritable catalog of modern management techniques that flopped. One of the most disastrous was a system for computerizing production scheduling that was too crude for complex machine-tool manufacturing. Holland

gives a dramatic depiction of supply snafus that resulted in delays and cost increases.

As an independent company, “Burgmaster thrived because the Burgs knew their business,” Holland writes. Their departure under Hou- daille was followed by an “endless and ultimately futile search for a better formula.” But, he concludes: “No formula was a substitute for management involvement on the shop floor.”

In the end, however, Holland puts most of the blame for the indus- try’s decline on government policy. He targets tax laws and macro- economic policies that encourage LBOs and speculation instead of productive investment. He also criticizes Pentagon procurement policies for favoring exotic, custom machines over standard, low-cost models. This adds up to an industrial policy, Holland writes—a bad one.

The point is well taken, but Holland gives it excessive weight. Like their brethren in Detroit and Pittsburgh, domestic tool-makers in the 1970s were too complacent when imports seized the lower end of the product line. The conservatism that had for years served them in their cyclical industry left them ill-prepared for change. Even now some of the largest U.S. tool-makers are struggling to restructure. Blame the government, yes. But blame the industry, too.

Questions

1. Write a brief report that outlines the reasons (both internal and external) for Burgmaster’s demise, and whether operations man- agement played a significant role in the demise.

2. Do you think that inadequate strategic planning was a factor that resulted in the company’s asking for trade protection?

3. Can you think of a strategy that could have increased Burgmaster’s chance of survival? Explain why you think that strategy would have been effective.

Source: Reprinted from April 17, 1989, issue of BusinessWeek by special per- mission, copyright © 1989 by The McGraw-Hill Companies.

(continued)

The Company The baking company is located in a small town in New York State. The bakery is run by two brothers. The company employs fewer than 200 people, mainly blue-collar workers, and the atmosphere is informal.

The Product The company’s only product is soft cookies, of which it makes over 50 varieties. Larger companies, such as Nabisco, Sunshine, and Keebler, have traditionally produced biscuit cookies, in which most of the water has been baked out, resulting in crisp cookies. The cook- ies have no additives or preservatives. The high quality of the cook- ies has enabled the company to develop a strong market niche for its product.

The Customers The cookies are sold in convenience stores and super- markets throughout New York, Connecticut, and New Jersey. The company markets its cookies as “good food”—no additives or preservatives—and this appeals to a health-conscious segment of the market. Many custom- ers are over 45 years of age, and prefer a cookie that is soft and not too sweet. Parents with young children also buy the cookies.

The Production Process The company has two continuous band ovens that it uses to bake the cook- ies. The production process is called a batch processing system. It begins as soon as management gets orders from distributors. These orders are

CASE Home-Style Cookies

(continued)

ste24102_ch02_040-073.indd 67ste24102_ch02_040-073.indd 67 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

68 Chapter Two Competitiveness, Strategy, and Productivity

used to schedule production. At the start of each shift, a list of the cook- ies to be made that day is delivered to the person in charge of mixing. That person checks a master list, which indicates the ingredients needed for each type of cookie, and enters that information into the computer. The computer then determines the amount of each ingredient needed, according to the quantity of cookies ordered, and relays that information to storage silos located outside the plant where the main ingredients (flour, sugar, and cake flour) are stored. The ingredients are automatically sent to giant mixing machines where the ingredients are combined with proper amounts of eggs, water, and flavorings. After the ingredients have been mixed, the batter is poured into a cutting machine where it is cut into indi- vidual cookies. The cookies are then dropped onto a conveyor belt and transported through one of two ovens. Filled cookies, such as apple, date, and raspberry, require an additional step for filling and folding.

The nonfilled cookies are cut on a diagonal rather than round. The diagonal-cut cookies require less space than straight-cut cookies, and the result is a higher level of productivity. In addition, the com- pany recently increased the length of each oven by 25 feet, which also increased the rate of production.

As the cookies emerge from the ovens, they are fed onto spiral cool- ing racks 20 feet high and 3 feet wide. As the cookies come off the cooling racks, workers place the cookies into boxes manually, removing any broken or deformed cookies in the process. The boxes are then wrapped, sealed, and labeled automatically.

Inventory Most cookies are loaded immediately onto trucks and shipped to dis- tributors. A small percentage are stored temporarily in the company’s warehouse, but they must be shipped shortly because of their limited shelf life. Other inventory includes individual cookie boxes, shipping boxes, labels, and cellophane for wrapping. Labels are reordered fre- quently, in small batches, because FDA label requirements are subject to change, and the company does not want to get stuck with labels it can’t use. The bulk silos are refilled two or three times a week, depend- ing on how quickly supplies are used.

Cookies are baked in a sequence that minimizes downtime for cleaning. For instance, light-colored cookies (e.g., chocolate chip) are baked before dark-colored cookies (e.g., fudge), and oatmeal cookies are baked before oatmeal raisin cookies. This permits the company to avoid having to clean the processing equipment every time a different type of cookie is produced.

Quality The bakery prides itself on the quality of its cookies. Cookies are sampled randomly by a quality control inspector as they come off the line to assure that their taste and consistency are satisfactory, and that they have been baked to the proper degree. Also, workers on the line are responsible for removing defective cookies when they spot them. The company has also installed an X-ray machine on the line that can detect small bits of metal filings that may have gotten into cookies during the production process. The use of automatic equipment for transporting raw materials and mix- ing batter has made it easier to maintain a sterile process.

Scrap The bakery is run very efficiently and has minimal amounts of scrap. For example, if a batch is mixed improperly, it is sold for dog food. Bro- ken cookies are used in the oatmeal cookies. These practices reduce the cost of ingredients and save on waste disposal costs. The com- pany also uses heat reclamation: The heat that escapes from the two ovens is captured and used to boil the water that supplies the heat to the building. Also, the use of automation in the mixing process has resulted in a reduction in waste compared with the manual methods used previously.

New Products Ideas for new products come from customers, employees, and observa- tions of competitors’ products. New ideas are first examined to deter- mine whether the cookies can be made with existing equipment. If so, a sample run is made to determine the cost and time requirements. If the results are satisfactory, marketing tests are conducted to see if there is a demand for the product.

Potential Improvements There are a number of areas of potential improvement at the bakery. One possibility would be to automate packing the cookies into boxes. Although labor costs are not high, automating the process might save some money and increase efficiency. So far, the owners have resisted making this change because they feel an obligation to the community to employ the 30 women who now do the boxing manually. Another possible improvement would be to use suppliers who are located closer to the plant. That would reduce delivery lead times and transportation costs, but the owners are not convinced that local suppliers could pro- vide the same good quality. Other opportunities have been proposed in recent years, but the owners rejected them because they feared that the quality of the product might suffer.

Questions

1. Briefly describe the cookie production process. 2. What are two ways that the company has increased productiv-

ity? Why did increasing the length of the ovens result in a faster output rate?

3. Do you think that the company is making the right decision by not automating the packing of cookies? Explain your reasoning. What obligation does a company have to its employees in a situation such as this? What obligation does it have to the community? Is the size of the town a factor? Would it make a difference if the company was located in a large city? Is the size of the company a factor? What if it were a much larger company?

4. What factors cause the company to carry minimal amounts of cer- tain inventories? What benefits result from this policy?

5. As a consumer, what things do you consider in judging the quality of cookies you buy in a supermarket?

6. What advantages and what limitations stem from the company’s not using preservatives in cookies?

7. Briefly describe the company’s strategy.

(continued)

ste24102_ch02_040-073.indd 68ste24102_ch02_040-073.indd 68 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

69

(Refer to pp. 37–38 for the Hazel Case.)

1. What competitive advantage does Hazel have over a professional lawn care service?

2. Hazel would like to increase her profits, but she doesn’t believe that it would be wise to raise her prices considering the current state of the local economy. Instead, she has given some thought to increas- ing productivity. a. Explain how increased productivity could be an alternative to

increased prices. b. What are some ways that Hazel could increase productivity?

3. Hazel is thinking about the purchase of new equipment. One would be power sidewalk edgers. She believes edgers will lead to an increase in productivity. Another would be a chain saw, which would be used for tree pruning. What trade-offs should she consider in her analysis?

4. Hazel has been fairly successful in her neigh- borhood, and now wants to expand to other neighborhoods, including some that are five miles away. What would be the advantages and disadvantages of doing this?

5. Hazel does not have a mission statement or a set of objectives. Take one of the following positions and defend it:

a. Hazel doesn’t need a formal mission statement and objectives. Many small businesses don’t have them.

b. She definitely needs a mission statement and a set of objectives. They would be extremely beneficial.

c. There may be some benefit to Hazel’s business, and she should consider developing one.

CASE Hazel Revisited

Joseph Murray , Grand Valley State University “Your Garden Gloves” is a small gardening business located in Michigan. The company plants and maintains flower gardens for both commercial and residential clients. The company was founded about five years ago, and has since grown substantially, averaging about 10 new clients and one new employee a year. The company currently employs eight sea- sonal employees who are responsible for a certain number of clients.

Each morning crews are assigned to jobs by the owner. Crew sizes range from two to four workers. Crew size and composition are a func- tion of the square footage of the garden and requirements of the job. The owner feels that large jobs should be assigned to crews of four workers in order to complete the job in a reasonable amount of time.

From time to time, the owner noticed that some jobs, especially the largest ones, took longer than she had estimated, based on the square footage of the garden space involved. The owner’s son, Joe, decided to investigate. He kept records of job times and crew sizes, and then used those records to compute labor productivity. The results were:

The company operates on a small profit mar- gin, so it is especially important to take worker productivity into account.

Questions

1. Which crew size had the highest productivity per worker? Which crew size had the lowest productivity per worker? What are some possible explanations for these results?

2. After a recent storm, a customer called in a panic, saying that she had planned a garden party for the upcoming weekend and her gar- den was in shambles. The owner decided to send a crew of four workers, even though a two-worker crew would have a higher pro- ductivity. Explain the rationale for this decision.

3. What is a possible qualitative issue that may very well influence productivity levels that the productivity ratios fail to take into account?

CASE “Your Garden Gloves”

Crew Size Average Productivity per Crew

2 4,234 square feet per day 3 5,352 square feet per day 4 7,860 square feet per day

ste24102_ch02_040-073.indd 69ste24102_ch02_040-073.indd 69 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

70

“ Neither rain, nor snow  . . .”

The U.S. Postal Service (USPS) is the largest postal service in the world, handling about 41 percent (630 million pieces a day) of the world’s mail volume. The second largest is Japan’s, which handles only about 6 percent of the world’s mail. The USPS is huge by any standard. It employs over 760,000 workers, making it the largest civilian employer in the United States. It has over 300,000 mail collection boxes, 38,000 post offices, 130 million mail delivery points, more than 300 processing plants to sort and ship mail, and more than 75,000 pieces of mail pro- cessing equipment. It handles over 100 billion pieces of first-class mail a year, and ships about 3 billion pounds of mail on commercial airline flights, making it the airlines’ largest shipper.

Processing First-Class Mail The essence of processing the mail is sorting, which means organizing the mail into smaller and smaller subgroups to facilitate its timely deliv- ery. Sorting involves a combination of manual and automatic operations. Much of the mail that is processed is first-class mail.

Most first-class mail is handled using automated equipment. A small portion that cannot be handled by automated equipment must be sorted by hand, just the way it was done in colonial times.

The majority of first-class mail begins at the advanced facer canceling system. This system positions each letter so that it is face up, with the stamp in the upper corner, checks to see if the address is handwritten, and pulls the hand-addressed letters off the line. It also rejects letters that have the stamp covered by tape, have no postage, are third-class mail, or have meter impressions that are too light to read. The rejects are handled manually. The remaining letters are cancelled and date stamped, and then sorted to one of seven stackers.

Next the letters go to the multiline optical character readers, which can handle both printed and pre–bar-coded mail, but not hand- addressed mail. The optical reader sprays a bar code on the mail that hasn’t been pre–bar-coded, which represents up to an 11-digit zip code. For hand-addressed mail, a camera focuses on the front of the letter, and the image is displayed on a remote terminal, often in another city, where an operator views the image and provides the information that the optical readers could not determine so that a bar code can be added.

Bar-code readers then sort the mail into one of 96 stackers, doing this at a rate of more than 500 a minute. The mail goes through another sort using manually controlled mechanical equipment. At that point, the mail is separated according to whether it is local or out-of-town mail. The out-of-town mail is placed into appropriate sacks according to its destination, and moved to the outgoing send area where it will be loaded on trucks.

The local mail is moved to another machine that not only sorts the mail into local carrier delivery routes, it sorts it according to delivery walk sequence!

Small parcels, bundles of letters, and bundles of flats are sorted by a bundle-sorting machine.

Productivity Over the years, the USPS has experienced an ever- increasing volume of mail. Productivity has been an important factor for the USPS in keeping postal rates low and maintaining rapid deliv- ery service. Two key factors in improved productivity have been the increased use of automation and the introduction of zip codes.

Mail processing underwent a major shift to mechanization during the 1950s and 1960s, which led to more rapid processing and higher productivity. In 1978, an expanded zip code was introduced. That was followed in 1983 by a four-digit expansion in zip codes. These changes required new, automated processing equipment, and the use of bar codes and optical readers. All of these changes added greatly to pro- ductivity. But even with these improvements, the USPS faced increasing competitive pressures.

Competition In the late 1980s, the USPS experienced a slowdown in the volume of mail. Some of this was due to a slowing of the economy, but most of it was the result of increasing competition. Delivery giants FedEx and UPS, as well as other companies that offer speedy delivery and package tracking, gave businesses and the general public convenient alternatives for some mail services. At the same time, there was a growing use of fax machines and electronic communications and increased use of alternate forms of advertising such as cable TV, all of which cut into the volume of mail. Early in this century, e-mail and automated bill paying also cut into mail volume.

Strategies and Tactics Used to Make the Postal Service More Competitive To meet these challenges, the USPS developed several strategies to become more competitive. These included reorganizing, continuing to seek ways to keep costs down, increasing productivity, and emphasiz- ing quality and customer service. Here is an overview of the situation and the strategies and tactics used by the USPS.

The USPS began working more closely with customers to identify better ways to meet their needs and expanded customer conveniences such as stamps on consignment. With the help of business mailers, the USPS con- tinued support for rates reflecting customer work-sharing features, many tied to automation, to give customers more flexibility. At the same time, the USPS began forming Customer Advisory Councils—groups of citizens who volunteered to work with local postal management on postal issues of interest to the community. In 1990, the USPS awarded two contracts to private firms to measure first-class mail service and customer satisfac- tion. In 1992, the USPS stepped up its quest to become more competitive by reducing bureaucracy and overhead in order to improve service and customer satisfaction, and to reduce the need to increase postage rates.

To help accomplish these goals, the USPS underwent a reorganiza- tion. Layers of management were eliminated and overhead positions were cut by about 30,000. Five regions and 73 field divisions were replaced by 10 areas, each with a manager for customer services and a manager for processing and distribution. Ten customer service areas were established, with managers for customer service and processing

OPERATIONS TOUR The U.S. Postal Service

ste24102_ch02_040-073.indd 70ste24102_ch02_040-073.indd 70 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

and to overhaul and simplify its complex rate structure. It also awarded contracts for two more external tracking systems, one to measure sat- isfaction levels of business mailers, and the other to measure service performance of third-class mail.

The reorganization eliminated some programs, cut costs, attracted new business, and reduced the USPS’s projected deficit.

The postal services’ sustainability scorecard for 2012 is shown below.

and distribution in each area, as well as a marketing and sales office. The new structure allowed postal managers to be focused, improved communications, and empowered employees to meet customer needs. The USPS also took other steps to improve service. In 1993 it imple- mented improvements in processing and mail delivery at major postal facilities, expanded retail hours, and developed a more user-friendly Domestic Mail Manual. In cooperation with business customers, the USPS began to develop new services to meet specific mailer needs

(continued)

Chapter Two Competitiveness, Strategy, and Productivity 71

ste24102_ch02_040-073.indd 71ste24102_ch02_040-073.indd 71 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

72 Chapter Two Competitiveness, Strategy, and Productivity

6. What effect does the increased use of e-mail have on postal productivity?

7. How does the use of standard shipping containers and flat-rate mailers help competitiveness?

Source: http://about.usps.com/what-we-are-doing/green/pdf/ omb-scorecard-2012.pdf

Questions

1. Why is it important for the USPS to have a high volume of mail to process?

2. What caused productivity to increase? 3. What impact did competitive pressures have on the USPS? 4. What measures did the USPS adopt to increase competitiveness? 5. What results were achieved by the USPS’s changes?

(continued)

ste24102_ch02_040-073.indd 72ste24102_ch02_040-073.indd 72 11/10/13 4:07 PM11/10/13 4:07 PM

Final PDF to printer

Chapter Two Competitiveness, Strategy, and Productivity 73

Fortune.

Hammer, Michael, and Steven Stanton. “Ignore Opera- tions at Your Peril.” Harvard Business Review 6565 (April 2004).

Hill, Terry. Manufacturing Strategy: Text and Cases, 3rd ed. New York: McGraw-Hill, 2000.

Michael E. Porter, “The Five Competitive Forces That Shape Strategy,” Harvard Business Review 86, no. 1 (January 2008), pp. 78–93, 137.

Slack, Nigel, and Michael Lewis. Operations Strategy, 3e, Prentice-Hall, 2011. www.weforum.org/issues/ global-competitiveness: Global Competitiveness Report

Werbach, Adam. Strategy for Sustainability: A Business Manifesto. Boston: Harvard Business Press, 2009.

SELECTED BIBLIOGRAPHY AND FURTHER

READINGS

ste24102_ch02_040-073.indd 73ste24102_ch02_040-073.indd 73 11/29/13 1:03 AM11/29/13 1:03 AM

Final PDF to printer

74

C H A P T E R

3 CHAPTER OUTLINE

3.1 Introduction, 75

3.2 Features Common to All Forecasts, 77

3.3 Elements of a Good Forecast, 78

3.4 Forecasting and the Supply Chain 78

3.5 Steps in the Forecasting Process, 79

3.6 Forecast Accuracy, 79 Summarizing Forecast Accuracy, 81

3.7 Approaches to Forecasting, 82

3.8 Qualitative Forecasts 82 Executive Opinions, 83

Salesforce Opinions, 83

Consumer Surveys, 83

Other Approaches, 83

3.9 Forecasts Based on Time-Series Data, 84 Naive Methods, 84

Techniques for Averaging, 86

Other Forecasting Methods, 91

Techniques for Trend, 91

Trend-Adjusted Exponential Smoothing, 95

Techniques for Seasonality, 95

Techniques for Cycles, 100

3.10 Associative Forecasting Techniques, 100

Simple Linear Regression, 101

Comments on the Use of Linear Regression Analysis, 104

Nonlinear and Multiple Regression Analysis, 106

3.11 Monitoring Forecast Error, 106

3.12 Choosing a Forecasting Technique, 110

3.13 Using Forecast Information, 112

3.14 Computer Software in Forecasting, 112

3.15 Operations Strategy, 112

Cases: M&L Manufacturing, 132 Highline Financial Services, Ltd., 133

Forecasting

After completing this chapter, you should be able to:

LO3.1 List features common to all forecasts.

LO3.2 Explain why forecasts are generally wrong.

LO3.3 List the elements of a good forecast.

LO3.4 Outline the steps in the forecasting process.

LO3.5 Summarize forecast errors and use summaries to make decisions.

LO3.6 Describe four qualitative forecasting techniques.

LO3.7 Use a naive method to make a forecast.

LO3.8 Prepare a moving average forecast.

LO3.9 Prepare a weighted-average forecast.

LO3.10 Prepare an exponential smoothing forecast.

LO3.11 Prepare a linear trend forecast.

LO3.12 Prepare a trend-adjusted exponential smoothing forecast.

LO3.13 Compute and use seasonal relatives.

LO3.14 Compute and use regression and correlation coefficients.

LO3.15 Construct control charts and use them to monitor forecast errors.

LO3.16 Describe the key factors and trade-offs to consider when choosing a forecasting technique.

LEARNING OBJECTIVES

ste24102_ch03_074-133.indd 74ste24102_ch03_074-133.indd 74 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

75

Weather forecasts are one of the many types of forecasts used by some business organizations. Although some businesses sim- ply rely on publicly available weather forecasts, others turn to firms that specialize in weather-related forecasts. For example, Home Depot, Gap, and JCPenney use such firms to help them take weather factors into account for estimating demand.

Many new car buyers have a thing or two in common. Once they make the decision to buy a new car, they want it as soon as possible. They usually don’t want to order it and then have to wait six weeks or more for delivery. If the car dealer they visit doesn’t have the car they want, they’ll look elsewhere. Hence, it is important for a dealer to anticipate buyer wants and to have those models, with the necessary options, in stock. The dealer who can correctly forecast buyer wants, and have those cars available, is going to be much more successful than a competitor who guesses instead of forecasting—and guesses wrong—and gets stuck with cars customers don’t want. So how does the dealer know how many cars of each type to stock? The answer is, the dealer doesn’t know for sure, but by analyzing previous buying patterns, and perhaps making allowances for current condi- tions, the dealer can come up with a reasonable approximation of what buyers will want.

Planning is an integral part of a manager’s job. If uncertainties cloud the planning horizon, managers will find it difficult to plan effectively. Forecasts help managers by reducing some of the uncertainty, thereby enabling them to develop more mean- ingful plans. A forecast is an estimate about the future value of a variable such as demand. The better the estimate, the more informed decisions can be. Some forecasts are long range, covering several years or more. Long-range forecasts are especially important for decisions that will have long-term consequences for an organization or for a town, city, country, state, or nation. One example is deciding on the right capacity for a planned power plant that will operate for the next 20 years. Other forecasts are used to determine if there is a profit potential for a new service or a new product: Will there be sufficient demand to make the innovation worthwhile? Many forecasts are short term, covering a day or week. They are especially helpful in planning and scheduling day-to-day operations. This chapter provides a survey of business forecasting. It describes the elements of good forecasts, the necessary steps in preparing a forecast, basic forecasting techniques, and how to monitor a forecast.

3.1 INTRODUCTION Forecasts are a basic input in the decision processes of operations management because they provide information on future demand. The importance of forecasting to operations manage- ment cannot be overstated. The primary goal of operations management is to match supply to demand. Having a forecast of demand is essential for determining how much capacity or supply will be needed to meet demand. For instance, operations needs to know what capacity

Forecast  A statement about the future value of a variable of interest.

ste24102_ch03_074-133.indd 75ste24102_ch03_074-133.indd 75 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

76 Chapter Three Forecasting

will be needed to make staffing and equipment decisions, budgets must be prepared, purchas- ing needs information for ordering from suppliers, and supply chain partners need to make their plans.

Businesses make plans for future operations based on anticipated future demand. Antici- pated demand is derived from two possible sources, actual customer orders and forecasts. For businesses where customer orders make up most or all of anticipated demand, planning is straightforward, and little or no forecasting is needed. However, for many businesses, most or all of anticipated demand is derived from forecasts.

Two aspects of forecasts are important. One is the expected level of demand; the other is the degree of accuracy that can be assigned to a forecast (i.e., the potential size of forecast error). The expected level of demand can be a function of some structural variation, such as a trend or seasonal variation. Forecast accuracy is a function of the ability of forecasters to cor- rectly model demand, random variation, and sometimes unforeseen events.

Forecasts are made with reference to a specific time horizon. The time horizon may be fairly short (e.g., an hour, day, week, or month), or somewhat longer (e.g., the next six months, the next year, the next five years, or the life of a product or service). Short-term forecasts per- tain to ongoing operations. Long-range forecasts can be an important strategic planning tool. Long-term forecasts pertain to new products or services, new equipment, new facilities, or something else that will require a somewhat long lead time to develop, construct, or otherwise implement.

Forecasts are the basis for budgeting, planning capacity, sales, production and inventory, personnel, purchasing, and more. Forecasts play an important role in the planning process because they enable managers to anticipate the future so they can plan accordingly.

Forecasts affect decisions and activities throughout an organization, in accounting, finance, human resources, marketing, and management information systems (MIS), as well as in oper- ations and other parts of an organization. Here are some examples of uses of forecasts in business organizations:

Accounting. New product/process cost estimates, profit projections, cash management.

Finance. Equipment/equipment replacement needs, timing and amount of funding/ borrowing needs.

The Walt Disney World forecasting department has 20 employees who formulate forecasts on volume and revenue for the theme parks, water parks, resort hotels, as well as merchandise, food, and beverage revenue by location.

ste24102_ch03_074-133.indd 76ste24102_ch03_074-133.indd 76 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 77

Human resources. Hiring activities, including recruitment, interviewing, and training; layoff planning, including outplacement counseling.

Marketing. Pricing and promotion, e-business strategies, global competition strategies.

MIS. New/revised information systems, Internet services.

Operations. Schedules, capacity planning, work assignments and workloads, inventory planning, make-or-buy decisions, outsourcing, project management.

Product/service design. Revision of current features, design of new products or services.

In most of these uses of forecasts, decisions in one area have consequences in other areas. Therefore, it is very important for all affected areas to agree on a common forecast. How- ever, this may not be easy to accomplish. Different departments often have very different perspectives on a forecast, making a consensus forecast difficult to achieve. For example, salespeople, by their very nature, may be overly optimistic with their forecasts, and may want to “reserve” capacity for their customers. This can result in excess costs for operations and inventory storage. Conversely, if demand exceeds forecasts, operations and the supply chain may not be able to meet demand, which would mean lost business and dissatisfied customers.

Forecasting is also an important component of yield management, which relates to the per- centage of capacity being used. Accurate forecasts can help managers plan tactics (e.g., offer dis- counts, don’t offer discounts) to match capacity with demand, thereby achieving high yield levels.

There are two uses for forecasts. One is to help managers plan the system, and the other is to help them plan the use of the system. Planning the system generally involves long-range plans about the types of products and services to offer, what facilities and equipment to have, where to locate, and so on. Planning the use of the system refers to short-range and interme- diate-range planning, which involve tasks such as planning inventory and workforce levels, planning purchasing and production, budgeting, and scheduling.

Business forecasting pertains to more than predicting demand. Forecasts are also used to predict profits, revenues, costs, productivity changes, prices and availability of energy and raw materials, interest rates, movements of key economic indicators (e.g., gross domestic product, inflation, government borrowing), and prices of stocks and bonds. For the sake of simplicity, this chapter will focus on the forecasting of demand. Keep in mind, however, that the concepts and techniques apply equally well to the other variables.

In spite of its use of computers and sophisticated mathematical models, forecasting is not an exact science. Instead, successful forecasting often requires a skillful blending of science and intuition. Experience, judgment, and technical expertise all play a role in developing use- ful forecasts. Along with these, a certain amount of luck and a dash of humility can be helpful, because the worst forecasters occasionally produce a very good forecast, and even the best forecasters sometimes miss completely. Current forecasting techniques range from the mun- dane to the exotic. Some work better than others, but no single technique works all the time.

3.2 FEATURES COMMON TO ALL FORECASTS A wide variety of forecasting techniques are in use. In many respects, they are quite different from each other, as you shall soon discover. Nonetheless, certain features are common to all, and it is important to recognize them.

1. Forecasting techniques generally assume that the same underlying causal system that existed in the past will continue to exist in the future.

Comment A manager cannot simply delegate forecasting to models or computers and then forget about it, because unplanned occurrences can wreak havoc with forecasts. For instance, weather-related events, tax increases or decreases, and changes in features or prices of com- peting products or services can have a major impact on demand. Consequently, a manager must be alert to such occurrences and be ready to override forecasts, which assume a stable causal system.

LO3.1 List features common to all forecasts.

ste24102_ch03_074-133.indd 77ste24102_ch03_074-133.indd 77 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

78 Chapter Three Forecasting

2. Forecasts are not perfect; actual results usually differ from predicted values; the presence of randomness precludes a perfect forecast. Allowances should be made for forecast errors.

3. Forecasts for groups of items tend to be more accurate than forecasts for individual items because forecasting errors among items in a group usually have a canceling effect. Opportunities for grouping may arise if parts or raw materials are used for multiple products or if a product or service is demanded by a number of independent sources.

4. Forecast accuracy decreases as the time period covered by the forecast—the time horizon —increases. Generally speaking, short-range forecasts must contend with fewer uncertainties than longer-range forecasts, so they tend to be more accurate.

An important consequence of the last point is that flexible business organizations—those that can respond quickly to changes in demand—require a shorter forecasting horizon and, hence, benefit from more accurate short-range forecasts than competitors who are less flex- ible and who must therefore use longer forecast horizons.

3.3 ELEMENTS OF A GOOD FORECAST A properly prepared forecast should fulfill certain requirements:

1. The forecast should be timely. Usually, a certain amount of time is needed to respond to the information contained in a forecast. For example, capacity cannot be expanded over- night, nor can inventory levels be changed immediately. Hence, the forecasting horizon must cover the time necessary to implement possible changes.

2. The forecast should be accurate, and the degree of accuracy should be stated. This will enable users to plan for possible errors and will provide a basis for comparing alterna- tive forecasts.

3. The forecast should be reliable; it should work consistently. A technique that some- times provides a good forecast and sometimes a poor one will leave users with the uneasy feeling that they may get burned every time a new forecast is issued.

4. The forecast should be expressed in meaningful units. Financial planners need to know how many dollars will be needed, production planners need to know how many units will be needed, and schedulers need to know what machines and skills will be required. The choice of units depends on user needs.

5. The forecast should be in writing. Although this will not guarantee that all concerned are using the same information, it will at least increase the likelihood of it. In addition, a written forecast will permit an objective basis for evaluating the forecast once actual results are in.

6. The forecasting technique should be simple to understand and use. Users often lack confidence in forecasts based on sophisticated techniques; they do not understand either the circumstances in which the techniques are appropriate or the limitations of the tech- niques. Misuse of techniques is an obvious consequence. Not surprisingly, fairly simple forecasting techniques enjoy widespread popularity because users are more comfortable working with them.

7. The forecast should be cost-effective: The benefits should outweigh the costs.

3.4 FORECASTING AND THE SUPPLY CHAIN Accurate forecasts are very important for the supply chain. Inaccurate forecasts can lead to shortages and excesses throughout the supply chain. Shortages of materials, parts, and ser- vices can lead to missed deliveries, work disruption, and poor customer service. Conversely, overly optimistic forecasts can lead to excesses of materials and/or capacity, which increase

LO3.2 Explain why forecasts are generally wrong.

LO3.3 List the elements of a good forecast.

ste24102_ch03_074-133.indd 78ste24102_ch03_074-133.indd 78 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 79

costs. Both shortages and excesses in the supply chain have a negative impact not only on customer service but also on profits. Furthermore, inaccurate forecasts can result in temporary increases and decreases in orders to the supply chain, which can be misinterpreted by the supply chain.

Organizations can reduce the likelihood of such occurrences in a number of ways. One, obviously, is by striving to develop the best possible forecasts. Another is through collabora- tive planning and forecasting with major supply chain partners. Yet another way is through information sharing among partners and perhaps increasing supply chain visibility by allow- ing supply chain partners to have real-time access to sales and inventory information. Also important is rapid communication about poor forecasts as well as about unplanned events that disrupt operations (e.g., flooding, work stoppages), and changes in plans.

3.5 STEPS IN THE FORECASTING PROCESS There are six basic steps in the forecasting process:

1. Determine the purpose of the forecast. How will it be used and when will it be needed? This step will provide an indication of the level of detail required in the fore- cast, the amount of resources (personnel, computer time, dollars) that can be justified, and the level of accuracy necessary.

2. Establish a time horizon. The forecast must indicate a time interval, keeping in mind that accuracy decreases as the time horizon increases.

3. Obtain, clean, and analyze appropriate data. Obtaining the data can involve signifi- cant effort. Once obtained, the data may need to be “cleaned” to get rid of outliers and obviously incorrect data before analysis.

4. Select a forecasting technique.

5. Make the forecast.

6. Monitor the forecast errors. The forecast errors should be monitored to determine if the forecast is performing in a satisfactory manner. If it is not, reexamine the method, assumptions, validity of data, and so on; modify as needed; and prepare a revised forecast.

Note too that additional action may be necessary. For example, if demand was much less than the forecast, an action such as a price reduction or a promotion may be needed. Con- versely, if demand was much more than predicted, increased output may be advantageous. That may involve working overtime, outsourcing, or taking other measures.

3.6 FORECAST ACCURACY Accuracy and control of forecasts is a vital aspect of forecasting, so forecasters want to min- imize forecast errors. However, the complex nature of most real-world variables makes it almost impossible to correctly predict future values of those variables on a regular basis. Moreover, because random variation is always present, there will always be some residual error, even if all other factors have been accounted for. Consequently, it is important to include an indication of the extent to which the forecast might deviate from the value of the variable that actually occurs. This will provide the forecast user with a better perspective on how far off a forecast might be.

Decision makers will want to include accuracy as a factor when choosing among different techniques, along with cost. Accurate forecasts are necessary for the success of daily activi- ties of every business organization. Forecasts are the basis for an organization’s schedules, and unless the forecasts are accurate, schedules will be generated that may provide for too few or too many resources, too little or too much output, the wrong output, or the wrong tim- ing of output, all of which can lead to additional costs, dissatisfied customers, and headaches for managers.

SCREENCAM TUTORIAL

LO3.4 Outline the steps in the forecasting process.

ste24102_ch03_074-133.indd 79ste24102_ch03_074-133.indd 79 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

80 Chapter Three Forecasting

Some forecasting applications involve a series of forecasts (e.g., weekly revenues), whereas others involve a single forecast that will be used for a one-time decision (e.g., the size of a power plant). When making periodic forecasts, it is important to monitor forecast errors to determine if the errors are within reasonable bounds. If they are not, it will be necessary to take corrective action.

Forecast error is the difference between the value that occurs and the value that was predicted for a given time period. Hence, Error  �  Actual  �  Forecast:

et At Ft� � (3–1)

where

t   �  Any given time period

Positive errors result when the forecast is too low, negative errors when the forecast is too high. For example, if actual demand for a week is 100 units and forecast demand was 90 units, the forecast was too low; the error is 100  �  90  �   � 10.

Forecast errors influence decisions in two somewhat different ways. One is in making a choice between various forecasting alternatives, and the other is in evaluating the success or failure of a technique in use. We shall begin by examining ways to summarize forecast error over time, and see how that information can be applied to compare forecasting alternatives.

Error  Difference between the actual value and the value that was predicted for a given period.

new orders while they work off their inventories, creating a ripple effect that hits the entire sup- ply chain, from shippers, to producers, to suppliers of raw materials. Moreover, the cutbacks to the supply chain could be misinterpreted. The message is clear: Overly optimistic forecasts can be bad news.

Overly optimistic forecasts by retail store buyers can easily lead retail- ers to overorder, resulting in bloated inventories. When that happens, there is pressure on stores to cut prices in order to move the excess merchandise. Although customers delight in these markdowns, retailer profits generally suffer. Furthermore, retailers will naturally cut back on

READING High Forecasts Can Be Bad News

ers of raw materials

s,,,, p-

ste24102_ch03_074-133.indd 80ste24102_ch03_074-133.indd 80 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 81

Summarizing Forecast Accuracy Forecast accuracy is a significant factor when deciding among forecasting alternatives. Accu- racy is based on the historical error performance of a forecast.

Three commonly used measures for summarizing historical errors are the mean absolute deviation (MAD) , the mean squared error (MSE) , and the mean absolute percent error (MAPE) . MAD is the average absolute error, MSE is the average of squared errors, and MAPE is the average absolute percent error. The formulas used to compute MAD, 1 MSE, and MAPE are as follows:

� � �t t

n MAD

Actual Forecast (3–2)

t t n

MSE (Actual Forecast )2

1 �

� �

� (3–3)

� �

MAPE

Actual Forecast Actual

100t t t

n (3–4)

Example 1 illustrates the computation of MAD, MSE, and MAPE.

From a computational standpoint, the difference between these measures is that MAD weights all errors evenly, MSE weights errors according to their squared values, and MAPE weights according to relative error.

1 The absolute value, represented by the two vertical lines in Formula 3–2, ignores minus signs; all data are treated as positive values. For example, � 2 becomes � 2.

Mean absolute deviation (MAD)  The average absolute forecast error.

Mean squared error (MSE)   The average of squared forecast errors.

Mean absolute percent error (MAPE)  The average absolute percent error.

Compute MAD, MSE, and MAPE for the following data, showing actual and forecasted numbers of accounts serviced.

Period Actual Forecast (A  �  F)

Error |Error| Error 2 [ |Error| �  Actual ]  �  100

1............................. 217 215 2 2 4 .92%

2............................. 213 216 � 3 3 9 1.41

3............................. 216 215 1 1 1 .46

4............................. 210 214 � 4 4 16 1.90

5............................. 213 211 2 2 4 .94

6............................. 219 214 5 5 25 2.28

7............................. 216 217 � 1 1 1 .46

8............................. 212 216 � 4 4 16 1.89

� 2 22 76 10.26%

SCREENCAM TUTORIAL

E X A M P L E 1

e celx mhhe.com/stevenson12e

S O L U T I O N Using the figures shown in the table, e

n

e

n

n

MAD 22

8 2.75

MSE 2

1

76

8 1 10.86

MAPE Actual

100 10.26%

8 1.28%

e

LO3.5 Summarize forecast errors and use summaries to make decisions.

ste24102_ch03_074-133.indd 81ste24102_ch03_074-133.indd 81 11/9/13 2:28 PM11/9/13 2:28 PM

Final PDF to printer

82 Chapter Three Forecasting

One use for these measures is to compare the accuracy of alternative forecasting methods. For instance, a manager could compare the results to determine one which yields the lowest MAD, MSE, or MAPE for a given set of data. Another use is to track error performance over time to decide if attention is needed. Is error performance getting better or worse, or is it stay- ing about the same?

In some instances, historical error performance is secondary to the ability of a forecast to respond to changes in data patterns. Choice among alternative methods would then focus on the cost of not responding quickly to a change relative to the cost of responding to changes that are not really there (i.e., random fluctuations).

Overall, the operations manager must settle on the relative importance of historical perfor- mance versus responsiveness and whether to use MAD, MSE, or MAPE to measure historical performance. MAD is the easiest to compute, but weights errors linearly. MSE squares errors, thereby giving more weight to larger errors, which typically cause more problems. MAPE should be used when there is a need to put errors in perspective. For example, an error of 10 in a forecast of 15 is huge. Conversely, an error of 10 in a forecast of 10,000 is insignificant. Hence, to put large errors in perspective, MAPE would be used.

3.7 APPROACHES TO FORECASTING There are two general approaches to forecasting: qualitative and quantitative. Qualitative methods consist mainly of subjective inputs, which often defy precise numerical descrip- tion. Quantitative methods involve either the projection of historical data or the develop- ment of associative models that attempt to utilize causal (explanatory) variables to make a forecast.

Qualitative techniques permit inclusion of soft information (e.g., human factors, personal opinions, hunches) in the forecasting process. Those factors are often omitted or downplayed when quantitative techniques are used because they are difficult or impossible to quantify. Quantitative techniques consist mainly of analyzing objective, or hard, data. They usually avoid personal biases that sometimes contaminate qualitative methods. In practice, either approach or a combination of both approaches might be used to develop a forecast.

The following pages present a variety of forecasting techniques that are classified as judg- mental, time-series, or associative.

Judgmental forecasts rely on analysis of subjective inputs obtained from various sources, such as consumer surveys, the sales staff, managers and executives, and panels of experts. Quite frequently, these sources provide insights that are not otherwise available.

Time-series forecasts simply attempt to project past experience into the future. These techniques use historical data with the assumption that the future will be like the past. Some models merely attempt to smooth out random variations in historical data; others attempt to identify specific patterns in the data and project or extrapolate those patterns into the future, without trying to identify causes of the patterns.

Associative models use equations that consist of one or more explanatory variables that can be used to predict demand. For example, demand for paint might be related to variables such as the price per gallon and the amount spent on advertising, as well as to specific charac- teristics of the paint (e.g., drying time, ease of cleanup).

3.8 QUALITATIVE FORECASTS In some situations, forecasters rely solely on judgment and opinion to make forecasts. If management must have a forecast quickly, there may not be enough time to gather and ana- lyze quantitative data. At other times, especially when political and economic conditions are changing, available data may be obsolete and more up-to-date information might not yet be available. Similarly, the introduction of new products and the redesign of existing products

Judgmental forecasts   Forecasts that use subjective inputs such as opinions from consumer surveys, sales staff, managers, executives, and experts.

Time-series forecasts   Forecasts that project patterns identified in recent time-series observations.

Associative model   Forecasting technique that uses explanatory variables to predict future demand.

LO3.6 Describe four qualita- tive forecasting techniques.

ste24102_ch03_074-133.indd 82ste24102_ch03_074-133.indd 82 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 83

or packaging suffer from the absence of historical data that would be useful in forecasting. In such instances, forecasts are based on executive opinions, consumer surveys, opinions of the sales staff, and opinions of experts.

Executive Opinions A small group of upper-level managers (e.g., in marketing, operations, and finance) may meet and collectively develop a forecast. This approach is often used as a part of long-range plan- ning and new product development. It has the advantage of bringing together the considerable knowledge and talents of various managers. However, there is the risk that the view of one person will prevail, and the possibility that diffusing responsibility for the forecast over the entire group may result in less pressure to produce a good forecast.

Salesforce Opinions Members of the sales staff or the customer service staff are often good sources of informa- tion because of their direct contact with consumers. They are often aware of any plans the customers may be considering for the future. There are, however, several drawbacks to using salesforce opinions. One is that staff members may be unable to distinguish between what cus- tomers would like to do and what they actually will do. Another is that these people are some- times overly influenced by recent experiences. Thus, after several periods of low sales, their estimates may tend to become pessimistic. After several periods of good sales, they may tend to be too optimistic. In addition, if forecasts are used to establish sales quotas, there will be a conflict of interest because it is to the salesperson’s advantage to provide low sales estimates.

Consumer Surveys Because it is the consumers who ultimately determine demand, it seems natural to solicit input from them. In some instances, every customer or potential customer can be contacted. However, usually there are too many customers or there is no way to identify all potential customers. Therefore, organizations seeking consumer input usually resort to consumer sur- veys, which enable them to sample consumer opinions. The obvious advantage of consumer surveys is that they can tap information that might not be available elsewhere. On the other hand, a considerable amount of knowledge and skill is required to construct a survey, admin- ister it, and correctly interpret the results for valid information. Surveys can be expensive and time-consuming. In addition, even under the best conditions, surveys of the general public must contend with the possibility of irrational behavior patterns. For example, much of the consumer’s thoughtful information gathering before purchasing a new car is often under- mined by the glitter of a new car showroom or a high-pressure sales pitch. Along the same lines, low response rates to a mail survey should—but often don’t—make the results suspect.

If these and similar pitfalls can be avoided, surveys can produce useful information.

Other Approaches A manager may solicit opinions from a number of other managers and staff people. Occasion- ally, outside experts are needed to help with a forecast. Advice may be needed on political or economic conditions in the United States or a foreign country, or some other aspect of impor- tance with which an organization lacks familiarity.

Another approach is the Delphi method , an iterative process intended to achieve a con- sensus forecast. This method involves circulating a series of questionnaires among individu- als who possess the knowledge and ability to contribute meaningfully. Responses are kept anonymous, which tends to encourage honest responses and reduces the risk that one person’s opinion will prevail. Each new questionnaire is developed using the information extracted from the previous one, thus enlarging the scope of information on which participants can base their judgments.

The Delphi method has been applied to a variety of situations, not all of which involve forecasting. The discussion here is limited to its use as a forecasting tool.

Delphi method  An iterative process in which managers and staff complete a series of ques- tionnaires, each developed from the previous one, to achieve a consensus forecast.

ste24102_ch03_074-133.indd 83ste24102_ch03_074-133.indd 83 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

84 Chapter Three Forecasting

As a forecasting tool, the Delphi method is useful for technological forecasting, that is, for assessing changes in technology and their impact on an organization. Often the goal is to predict when a certain event will occur. For instance, the goal of a Delphi forecast might be to predict when video telephones might be installed in at least 50 percent of residential homes or when a vaccine for a disease might be developed and ready for mass distribution. For the most part, these are long-term, single-time forecasts, which usually have very little hard infor- mation to go by or data that are costly to obtain, so the problem does not lend itself to analyti- cal techniques. Rather, judgments of experts or others who possess sufficient knowledge to make predictions are used.

3.9 FORECASTS BASED ON TIME-SERIES DATA A time series is a time-ordered sequence of observations taken at regular intervals (e.g., hourly, daily, weekly, monthly, quarterly, annually). The data may be measurements of demand, earnings, profits, shipments, accidents, output, precipitation, productivity, or the consumer price index. Forecasting techniques based on time-series data are made on the assumption that future values of the series can be estimated from past values. Although no attempt is made to identify variables that influence the series, these methods are widely used, often with quite satisfactory results.

Analysis of time-series data requires the analyst to identify the underlying behavior of the series. This can often be accomplished by merely plotting the data and visually examining the plot. One or more patterns might appear: trends, seasonal variations, cycles, or variations around an average. In addition, there will be random and perhaps irregular variations. These behaviors can be described as follows:

1. Trend refers to a long-term upward or downward movement in the data. Population shifts, changing incomes, and cultural changes often account for such movements.

2. Seasonality refers to short-term, fairly regular variations generally related to factors such as the calendar or time of day. Restaurants, supermarkets, and theaters experience weekly and even daily “seasonal” variations.

3. Cycles are wavelike variations of more than one year’s duration. These are often related to a variety of economic, political, and even agricultural conditions.

4. Irregular variations are due to unusual circumstances such as severe weather condi- tions, strikes, or a major change in a product or service. They do not reflect typical behavior, and their inclusion in the series can distort the overall picture. Whenever pos- sible, these should be identified and removed from the data.

5. Random variations are residual variations that remain after all other behaviors have been accounted for.

These behaviors are illustrated in Figure 3.1 . The small “bumps” in the plots represent random variability.

The remainder of this section describes the various approaches to the analysis of time- series data. Before turning to those discussions, one point should be emphasized: A demand forecast should be based on a time series of past demand rather than unit sales. Sales would not truly reflect demand if one or more stockouts occurred.

Naive Methods A simple but widely used approach to forecasting is the naive approach. A naive forecast uses a single previous value of a time series as the basis of a forecast. The naive approach can be used with a stable series (variations around an average), with seasonal variations, or with trend. With a stable series, the last data point becomes the forecast for the next period. Thus, if demand for a product last week was 20 cases, the forecast for this week is 20 cases. With seasonal variations, the forecast for this “season” is equal to the value of the series last “sea- son.” For example, the forecast for demand for turkeys this Thanksgiving season is equal to

Time series  A time-ordered sequence of observations taken at regular intervals.

Trend  A long-term upward or downward movement in data.

Seasonality  Short-term regular variations related to the calendar or time of day.

Cycle  Wavelike variations lasting more than one year.

Irregular variation  Caused by unusual circumstances, not reflective of typical behavior.

Random variations  Residual variations after all other behaviors are accounted for.

Naive forecast  A forecast for any period that equals the previ- ous period’s actual value.

LO3.7 Use a naive method to make a forecast.

ste24102_ch03_074-133.indd 84ste24102_ch03_074-133.indd 84 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 85

demand for turkeys last Thanksgiving; the forecast of the number of checks cashed at a bank on the first day of the month next month is equal to the number of checks cashed on the first day of this month; and the forecast for highway traffic volume this Friday is equal to the high- way traffic volume last Friday. For data with trend, the forecast is equal to the last value of the series plus or minus the difference between the last two values of the series. For example, suppose the last two values were 50 and 53. The next forecast would be 56:

FIGURE 3.1 Trend, cyclical, and seasonal data plots, with random and irregular variations

y

0 Time

y

J

Time

y

y

y

y

0

F M A M J J A S O N D

Year 4

Year 3

Year 2

Year 1

Seasonal variations

Month

Cycles

Irregular variation

Trend

Period Actual Change from

Previous Value Forecast

1 50

2 53 � 3

3 53  �  3  �  56

Although at first glance the naive approach may appear too simplistic, it is nonetheless a legitimate forecasting tool. Consider the advantages: It has virtually no cost, it is quick and easy to prepare because data analysis is nonexistent, and it is easily understandable. The main objection to this method is its inability to provide highly accurate forecasts. However, if resulting accuracy is acceptable, this approach deserves serious consideration. Moreover, even if other forecasting techniques offer better accuracy, they will almost always involve a greater cost. The accuracy of a naive forecast can serve as a standard of comparison against which to judge the cost and accuracy of other techniques. Thus, managers must answer the question: Is the increased accuracy of another method worth the additional resources required to achieve that accuracy?

ste24102_ch03_074-133.indd 85ste24102_ch03_074-133.indd 85 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

86 Chapter Three Forecasting

Techniques for Averaging Historical data typically contain a certain amount of random variation, or white noise, that tends to obscure systematic movements in the data. This randomness arises from the com- bined influence of many—perhaps a great many—relatively unimportant factors, and it can- not be reliably predicted. Averaging techniques smooth variations in the data. Ideally, it would be desirable to completely remove any randomness from the data and leave only “real” varia- tions, such as changes in the demand. As a practical matter, however, it is usually impossible to distinguish between these two kinds of variations, so the best one can hope for is that the small variations are random and the large variations are “real.”

Averaging techniques smooth fluctuations in a time series because the individual highs and lows in the data offset each other when they are combined into an average. A forecast based on an average thus tends to exhibit less variability than the original data (see Figure 3.2 ). This can be advantageous because many of these movements merely reflect random variability rather than a true change in the series. Moreover, because responding to changes in expected demand often entails considerable cost (e.g., changes in production rate, changes in the size of a workforce, inventory changes), it is desirable to avoid reacting to minor variations. Thus, minor variations are treated as random variations, whereas larger variations are viewed as more likely to reflect “real” changes, although these, too, are smoothed to a certain degree.

Averaging techniques generate forecasts that reflect recent values of a time series (e.g., the average value over the last several periods). These techniques work best when a series tends to vary around an average, although they also can handle step changes or gradual changes in the level of the series. Three techniques for averaging are described in this section:

1. Moving average.

2. Weighted moving average.

3. Exponential smoothing.

Moving Average. One weakness of the naive method is that the forecast just traces the actual data, with a lag of one period; it does not smooth at all. But by expanding the amount of historical data a forecast is based on, this difficulty can be overcome. A moving average fore- cast uses a number of the most recent actual data values in generating a forecast. The moving average forecast can be computed using the following equation:

� � � � � � � � �Ft n

At i i

n

At n At At n

MA 1 ... 2 1

− = ∑ n

(3–5)

where

F t   �  Forecast for time period t

MA n   �   n period moving average

A t � i   �  Actual value in period t   �   i

n   �  Number of periods (data points) in the moving average

For example, MA 3 would refer to a three-period moving average forecast, and MA 5 would refer to a five-period moving average forecast.

SCREENCAM TUTORIAL

Moving average  Technique that averages a number of recent actual values, updated as new values become available.

FIGURE 3.2 Averaging applied to three possible patterns

Data

Forecast Ideal Step change

(Forecast lags)

Gradual change

(Forecast lags)

LO3.8 Prepare a moving average forecast.

ste24102_ch03_074-133.indd 86ste24102_ch03_074-133.indd 86 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 87

Note that in a moving average, as each new actual value becomes available, the forecast is updated by adding the newest value and dropping the oldest and then recomputing the aver- age. Consequently, the forecast “moves” by reflecting only the most recent values.

In computing a moving average, including a moving total column—which gives the sum of the n most current values from which the average will be computed—aids computations. To update the moving total: Subtract the oldest value from the newest value and add that amount to the moving total for each update.

Figure 3.3 illustrates a three-period moving average forecast plotted against actual demand over 31 periods. Note how the moving average forecast lags the actual values and how smooth the forecasted values are compared with the actual values.

The moving average can incorporate as many data points as desired. In selecting the number of periods to include, the decision maker must take into account that the number of data points in the average determines its sensitivity to each new data point: The fewer the data points in an average, the more sensitive (responsive) the average tends to be. (See Figure 3.4A .)

If responsiveness is important, a moving average with relatively few data points should be used. This will permit quick adjustment to, say, a step change in the data, but it also will cause

S O L U T I O N F6

43 40 41

3 41.33�

� � �

If actual demand in period 6 turns out to be 38, the moving average forecast for period 7 would be

F7 40 41 38

3 39.67�

� � �

Compute a three-period moving average forecast given demand for shopping carts for the last five periods.

Period Demand

1 42

2 40

3 43

the 3 most recent demands4 40

5 41

E X A M P L E 2

} e celx

mhhe.com/stevenson12e

FIGURE 3.3 A moving average forecast tends to smooth and lag changes in the data

y

50

40

30

20

10

5

Period

10 15 20 25 300 t

D em

an d

3-period moving average (MA)

Demand

ste24102_ch03_074-133.indd 87ste24102_ch03_074-133.indd 87 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

88 Chapter Three Forecasting

the forecast to be somewhat responsive even to random variations. Conversely, moving aver- ages based on more data points will smooth more but be less responsive to “real” changes. Hence, the decision maker must weigh the cost of responding more slowly to changes in the data against the cost of responding to what might simply be random variations. A review of forecast errors can help in this decision.

The advantages of a moving average forecast are that it is easy to compute and easy to understand. A possible disadvantage is that all values in the average are weighted equally. For instance, in a 10-period moving average, each value has a weight of 1/10. Hence, the oldest value has the same weight as the most recent value. If a change occurs in the series, a moving average forecast can be slow to react, especially if there are a large number of values in the average. Decreasing the number of values in the average increases the weight of more recent values, but it does so at the expense of losing potential information from less recent values.

Weighted Moving Average. A weighted average is similar to a moving average, except that it typically assigns more weight to the most recent values in a time series. For instance, the most recent value might be assigned a weight of .40, the next most recent value a weight of .30, the next after that a weight of .20, and the next after that a weight of .10. Note that the weights must sum to 1.00, and that the heaviest weights are assigned to the most recent values.

F w A A A w A( ) ... ( ) ( ) ( ) ... ( )t t n t n t t t t2 2 1 1 1 1w w w At t t n t n� � � � � � �� � � � � � � � � � (3–6)

where

w t � 1   �  Weight for period t   �  1, etc.

A t � 1   �  Actual value for period t   �  1, etc.

Weighted average  More recent values in a series are given more weight in computing a forecast.

FIGURE 3.4A The more periods in a moving average, the greater the forecast will lag changes in the data

Period

64 5321 7 8 9 10 11 12 13 14 15

40

35

30 D

em an

d

Data

MA 3

MA 5

Given the following demand data,

a. Compute a weighted average forecast using a weight of .40 for the most recent period, .30 for the next most recent, .20 for the next, and .10 for the next.

b. If the actual demand for period 6 is 39, forecast demand for period 7 using the same weights as in part a.

Period Demand

1 42

2 40

3 43

4 40

5 41

E X A M P L E 3

LO3.9 Prepare a weighted- average forecast.

ste24102_ch03_074-133.indd 88ste24102_ch03_074-133.indd 88 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 89

Note that if four weights are used, only the four most recent demands are used to prepare the forecast.

The advantage of a weighted average over a simple moving average is that the weighted average is more reflective of the most recent occurrences. However, the choice of weights is somewhat arbitrary and generally involves the use of trial and error to find a suitable weighting scheme.

Exponential Smoothing. Exponential smoothing is a sophisticated weighted averaging method that is still relatively easy to use and understand. Each new forecast is based on the previous forecast plus a percentage of the difference between that forecast and the actual value of the series at that point. That is:

Next forecast Previous forecast (Actual Previous forecast)� � � �

where (Actual  �  Previous forecast) represents the forecast error and � is a percentage of the error. More concisely,

( )1 1 1F F A Ft t t t� � � �� � � (3–7a)

where

F t   �  Forecast for period t

F t � 1   �  Forecast for the previous period (i.e., period t   �  1)

�   �  Smoothing constant (percentage)

A t � 1   �  Actual demand or sales for the previous period

The smoothing constant � represents a percentage of the forecast error. Each new forecast is equal to the previous forecast plus a percentage of the previous error. For example, suppose the previous forecast was 42 units, actual demand was 40 units, and �   �  .10. The new forecast would be computed as follows:

42 .10(40 42) 41.8Ft � � � �

Then, if the actual demand turns out to be 43, the next forecast would be

41.8 .10(43 41.8) 41.92Ft � � � �

An alternate form of Formula 3–7a reveals the weighting of the previous forecast and the latest actual demand:

(1 ) 1 1F F At t t� � � � �� � (3–7b)

For example, if �   �  .10, this would be

.90 .101 1F F At t t� �� �

The quickness of forecast adjustment to error is determined by the smoothing constant, � . The closer its value is to zero, the slower the forecast will be to adjust to forecast errors (i.e., the greater the smoothing). Conversely, the closer the value of � is to 1.00, the greater the responsiveness and the less the smoothing. This is illustrated in Figure 3.4B .

Exponential smoothing  A weighted averaging method based on previous forecast plus a percentage of the forecast error.

SCREENCAM TUTORIAL

S O L U T I O N a. F6 � .10(40) � .20(43) � .30(40) � .40(41) � 41.0 b. F7 � .10(43) � .20(40) � .30(41) � .40(39) � 40.2

LO3.10 Prepare an exponen- tial smoothing forecast.

ste24102_ch03_074-133.indd 89ste24102_ch03_074-133.indd 89 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

90 Chapter Three Forecasting

Selecting a smoothing constant is basically a matter of judgment or trial and error, using forecast errors to guide the decision. The goal is to select a smoothing constant that balances the benefits of smoothing random variations with the benefits of responding to real changes if and when they occur. Commonly used values of � range from .05 to .50. Low values of � are used when the underlying average tends to be stable; higher values are used when the underly- ing average is susceptible to change.

Some computer packages include a feature that permits automatic modification of the smoothing constant if the forecast errors become unacceptably large.

Exponential smoothing is one of the most widely used techniques in forecasting, partly because of its ease of calculation and partly because of the ease with which the weighting scheme can be altered—simply by changing the value of � .

Note Exponential smoothing should begin several periods back to enable forecasts to adjust to the data, instead of starting one period back. A number of different approaches can be used to obtain a starting forecast, such as the average of the first several periods, a subjective estimate, or the first actual value as the forecast for period 2 (i.e., the naive approach). For simplicity, the naive approach is used in this book. In practice, using an average of, say, the first three values as a forecast for period 4 would provide a better starting forecast because that would tend to be more representative.

FIGURE 3.4B The closer � is to zero, the greater the smoothing

Period

Actual α = .4

α = .1 45

40

D em

an d

2 4 6 8 10 120

Period (t ) Actual

Demand � � .10 Forecast

� � .40 Forecast

1 42 — — 2 40 42 42 3 43 41.8 41.2 4 40 41.92 41.92 5 41 41.73 41.15 6 39 41.66 41.09 7 46 41.39 40.25 8 44 41.85 42.55 9 45 42.07 43.13

10 38 42.35 43.88 11 40 41.92 41.53 12 41.73 40.92

starting forecast

e celx mhhe.com/stevenson12e

Compare the error performance of these three forecasting techniques using MAD, MSE, and MAPE: a naive forecast, a two-period moving average, and exponential smoothing with � � .10 for periods 3 through 11, using the data shown in Figure 3.4B.

E X A M P L E 4

ste24102_ch03_074-133.indd 90ste24102_ch03_074-133.indd 90 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 91

Other Forecasting Methods You may find two other approaches to forecasting interesting. They are briefly described in this section.

Focus Forecasting. Some companies use forecasts based on a “best recent performance” basis. This approach, called focus forecasting , was developed by Bernard T. Smith, and is described in several of his books. 2 It involves the use of several forecasting methods (e.g., moving average, weighted average, and exponential smoothing) all being applied to the last few months of historical data after any irregular variations have been removed. The method that has the highest accuracy is then used to make the forecast for the next month. This pro- cess is used for each product or service, and is repeated monthly. Example 4 illustrates this kind of comparison.

Diffusion Models. When new products or services are introduced, historical data are not generally available on which to base forecasts. Instead, predictions are based on rates of prod- uct adoption and usage spread from other established products, using mathematical diffusion models. These models take into account such factors as market potential, attention from mass media, and word of mouth. Although the details are beyond the scope of this text, it is impor- tant to point out that diffusion models are widely used in marketing and to assess the merits of investing in new technologies.

Techniques for Trend Analysis of trend involves developing an equation that will suitably describe trend (assum- ing that trend is present in the data). The trend component may be linear, or it may not. Some

2 See, for example, Bernard T. Smith and Virginia Brice, Focus Forecasting: Computer Techniques for Inventory Control Revised for the Twenty-First Century (Essex Junction, VT: Oliver Wight, 1984).

Focus Forecasting  Using the forecasting method that demon- strates the best recent success.

SCREENCAM TUTORIAL

S O L U T I O NNaive Two-period MA Exponential Smoothing Period, t Demand Forecast Error Forecast Error Forecast Error

1 42 — —

2 40 42 �2 42 �2

3 43 40 3 41 2 41.8 1.2

4 40 43 �3 41.5 �1.5 41.92 �1.92

5 41 40 1 41.5 �0.5 41.73 �0.73

6 39 41 �2 40.5 �1.5 41.66 �2.66

7 46 39 7 40 6 41.39 4.61

8 44 46 �2 42.5 1.5 41.85 2.15

9 45 44 1 45 0 42.07 2.93

10 38 45 �7 44.5 �6.5 42.36 �4.36

11 40 38 2 41.5 �1.5 41.92 �1.92

MAD 3.11 2.33 2.50

MSE 16.25 11.44 8.73

MAPE 7.49% 5.64% 5.98%

If lowest MAD is the criterion, the two-period moving average forecast has the greatest accu- racy; if lowest MSE is the criterion, exponential smoothing works best; and if lowest MAPE is the criterion, the two-period moving average method is again best. Of course, with other data, or with different values of � for exponential smoothing, and different moving averages, the best performers could be different.

ste24102_ch03_074-133.indd 91ste24102_ch03_074-133.indd 91 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

92 Chapter Three Forecasting

commonly encountered nonlinear trend types are illustrated in Figure 3.5 . A simple plot of the data often can reveal the existence and nature of a trend. The discussion here focuses exclu- sively on linear trends because these are fairly common.

There are two important techniques that can be used to develop forecasts when trend is present. One involves use of a trend equation; the other is an extension of exponential smoothing.

Trend Equation. A linear trend equation has the form

F a btt � � (3–8)

where

F t   �  Forecast for period t

a   �  Value of F t at t   �  0, which is the y intercept

b   �  Slope of the line

t   �  Specified number of time periods from t   �  0

For example, consider the trend equation F t   �  45  �  5 t. The value of F t when t   �  0 is 45, and the slope of the line is 5, which means that, on the average, the value of F t will increase by five units for each time period. If t   �  10, the forecast, F t , is 45  �  5(10)  �  95 units. The equation can be plotted by finding two points on the line. One can be found by substituting

Linear trend equation   F t   �   a   �   bt, used to develop forecasts when trend is present.

FIGURE 3.5 Graphs of some nonlinear trends

Time

y

Time

y

Time

y

Time

y

Parabolic trend

Life cycle trend

Exponential trend

Growth curve

LO3.11 Prepare a linear trend forecast.

0

a

y

t

y

t y

b = D

D D

tD

Ft = a + bt

ste24102_ch03_074-133.indd 92ste24102_ch03_074-133.indd 92 11/9/13 2:28 PM11/9/13 2:28 PM

Final PDF to printer

Chapter Three Forecasting 93

some value of t into the equation (e.g., t   �  10) and then solving for F t . The other point is a (i.e., F t at t   �  0). Plotting those two points and drawing a line through them yields a graph of the linear trend line.

The coefficients of the line, a and b, are based on the following two equations:

( )2 2

b n ty t y

n t t �

� � � �

� � � (3–9)

a y b t

n y b tor�

� � � � (3–10)

where

n   �  Number of periods

y   �  Value of the time series

Note that these two equations are identical to those used for computing a linear regression line, except that t replaces x in the equations. Values for the trend equation can be obtained easily by using the Excel template for linear trend.

Cell phone sales for a California-based firm over the last 10 weeks are shown in the following table. Plot the data, and visually check to see if a linear trend line would be appropriate. Then determine the equation of the trend line, and predict sales for weeks 11 and 12.

Week Unit Sales

1 700

2 724

3 720

4 728

5 740

6 742

7 758

8 750

9 770

10 775

E X A M P L E 5

e celx mhhe.com/stevenson12e

S O L U T I O N a. A plot suggests that a linear trend line would be appropriate:

Week

2 4 6 8 10 121 3 5 7 9 11

780

S al

es

760

740

720

700

ste24102_ch03_074-133.indd 93ste24102_ch03_074-133.indd 93 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

94 Chapter Three Forecasting

b. The solution obtained by using the Excel template for linear trend is shown in Table 3.1.

b � 7.51 and a � 699.40

The trend line is Ft � 699.40 � 7.51t, where t � 0 for period 0.

c. Substituting values of t into this equation, the forecasts for the next two periods (i.e., t � 11 and t � 12) are:

F11 � 699.40 � 7.51(11) � 782.01

F12 � 699.40 � 7.51(12) � 789.52

d. For purposes of illustration, the original data, the trend line, and the two projections (forecasts) are shown on the following graph:

Week 2 4 6 8 10 121 3 5 7 9 11

S al

es

Trend lineData

Forecasts

780

800

760

740

720

700

TABLE 3.1 Excel solution for Example 5

ste24102_ch03_074-133.indd 94ste24102_ch03_074-133.indd 94 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 95

Trend-Adjusted Exponential Smoothing A variation of simple exponential smoothing can be used when a time series exhibits a linear trend. It is called trend-adjusted exponential smoothing or, sometimes, double smoothing, to differentiate it from simple exponential smoothing, which is appropriate only when data vary around an average or have step or gradual changes. If a series exhibits trend, and simple smoothing is used on it, the forecasts will all lag the trend: If the data are increasing, each forecast will be too low; if decreasing, each forecast will be too high.

The trend-adjusted forecast (TAF) is composed of two elements: a smoothed error and a trend factor.

TAF 1 S Tt t t� �� (3–11)

where

S t   �  Previous forecast plus smoothed error

T t   �  Current trend estimate

and

TAF ( TAF )

(TAF TAF )1 1 1

S A

T T T

t t t t

t t t t t

� � � �

� � � � �� � � (3–12)

where

�   �  Smoothing constant for average

�   �  Smoothing constant for trend

In order to use this method, one must select values of � and � (usually through trial and error) and make a starting forecast and an estimate of trend.

Trend-adjusted exponential smoothing  Variation of expo- nential smoothing used when a time series exhibits a linear trend.

SCREENCAM TUTORIAL

LO3.12 Prepare a trend- adjusted exponential smoothing forecast.

Using the cell phone data from the previous example (where it was concluded that the data exhibited a linear trend), use trend-adjusted exponential smoothing to obtain forecasts for periods 6 through 11, with � � .40 and � � .30.

E X A M P L E 6 e celx

mhhe.com/stevenson12e

S O L U T I O NThe initial estimate of trend is based on the net change of 28 for the three changes from period 1 to period 4, for an average of 9.33. The Excel spreadsheet is shown in Table 3.2. Notice that an initial estimate of trend is estimated from the first four values and that the starting fore- cast (period 5) is developed using the previous (period 4) value of 728 plus the initial trend estimate:

Starting forecast 728 9.33 737.33� � �

Unlike a linear trend line, trend-adjusted smoothing has the ability to adjust to changes in trend. Of course, trend projections are much simpler with a trend line than with trend- adjusted forecasts, so a manager must decide which benefits are most important when choos- ing between these two techniques for trend.

Techniques for Seasonality Seasonal variations in time-series data are regularly repeating upward or downward move- ments in series values that can be tied to recurring events. Seasonality may refer to regular annual variations. Familiar examples of seasonality are weather variations (e.g., sales of win- ter and summer sports equipment) and vacations or holidays (e.g., airline travel, greeting card sales, visitors at tourist and resort centers). The term seasonal variation is also applied to daily, weekly, monthly, and other regularly recurring patterns in data. For example, rush hour

Seasonal variations   Regularly repeating movements in series values that can be tied to recur- ring events.

ste24102_ch03_074-133.indd 95ste24102_ch03_074-133.indd 95 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

96 Chapter Three Forecasting

traffic occurs twice a day—incoming in the morning and outgoing in the late afternoon. Theaters and restaurants often experience weekly demand pat- terns, with demand higher later in the week. Banks may experience daily seasonal variations (heavier traffic during the noon hour and just before closing), weekly variations (heavier toward the end of the week), and monthly variations (heaviest around the beginning of the month because of Social Security, payroll, and welfare checks being cashed or deposited). Mail volume; sales of toys, beer, auto- mobiles, and turkeys; highway usage; hotel registrations; and gardening also exhibit seasonal variations.

Seasonality in a time series is expressed in terms of the amount that actual values deviate from the average value of a series. If the series tends to

vary around an average value, then seasonality is expressed in terms of that average (or a mov- ing average); if trend is present, seasonality is expressed in terms of the trend value.

There are two different models of seasonality: additive and multiplicative. In the additive model, seasonality is expressed as a quantity (e.g., 20 units), which is added to or subtracted from the series average in order to incorporate seasonality. In the multiplicative model, sea- sonality is expressed as a percentage of the average (or trend) amount (e.g., 1.10), which is then used to multiply the value of a series to incorporate seasonality. Figure 3.6 illustrates the two models for a linear trend line. In practice, businesses use the multiplicative model much more widely than the additive model, because it tends to be more representative of actual experience, so we shall focus exclusively on the multiplicative model.

TABLE 3.2 Using the Excel template for trend-adjusted smoothing

ste24102_ch03_074-133.indd 96ste24102_ch03_074-133.indd 96 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 97

The seasonal percentages in the multiplicative model are referred to as seasonal relatives or seasonal indexes. Suppose that the seasonal relative for the quantity of toys sold in May at a store is 1.20. This indicates that toy sales for that month are 20 percent above the monthly average. A seasonal relative of .90 for July indicates that July sales are 90 percent of the monthly average.

Knowledge of seasonal variations is an important factor in retail planning and scheduling. Moreover, seasonality can be an important factor in capacity planning for systems that must be designed to handle peak loads (e.g., public transportation, electric power plants, highways, and bridges). Knowledge of the extent of seasonality in a time series can enable one to remove seasonality from the data (i.e., to seasonally adjust data) in order to discern other patterns or the lack of patterns in the series. Thus, one frequently reads or hears about “seasonally adjusted unemployment” and “seasonally adjusted personal income.”

The next section briefly describes how seasonal relatives are used.

Using Seasonal Relatives. Seasonal relatives are used in two different ways in forecast- ing. One way is to deseasonalize data; the other way is to incorporate seasonality in a forecast.

To deseasonalize data is to remove the seasonal component from the data in order to get a clearer picture of the nonseasonal (e.g., trend) components. Deseasonalizing data is accom- plished by dividing each data point by its corresponding seasonal relative (e.g., divide Novem- ber demand by the November relative, divide December demand by the December relative, and so on).

Incorporating seasonality in a forecast is useful when demand has both trend (or average) and seasonal components. Incorporating seasonality can be accomplished in this way:

1. Obtain trend estimates for desired periods using a trend equation.

2. Add seasonality to the trend estimates by multiplying (assuming a multiplicative model is appropriate) these trend estimates by the corresponding seasonal relative (e.g., mul- tiply the November trend estimate by the November seasonal relative, multiply the December trend estimate by the December seasonal relative, and so on).

Example 7 illustrates these two techniques.

Seasonal relative  Percentage of average or trend.

FIGURE 3.6 Seasonality: the additive and multiplicative models compared using a linear trend

Time

Demand

Multiplicative model Demand = Trend x Seasonality

Additive model Demand = Trend + Seasonality

LO3.13 Compute and use seasonal relatives.

A coffee shop owner wants to estimate demand for the next two quarters for hot chocolate. Sales data consist of trend and seasonality.

a. Quarter relatives are 1.20 for the first quarter, 1.10 for the second quarter, 0.75 for the third quarter, and 0.95 for the fourth quarter. Use this information to deseasonalize sales for quarters 1 through 8.

b. Using the appropriate values of quarter relatives and the equation Ft � 124 � 7.5t for the trend component, estimate demand for periods 9 and 10.

E X A M P L E 7 e celx

mhhe.com/stevenson12e

ste24102_ch03_074-133.indd 97ste24102_ch03_074-133.indd 97 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

98 Chapter Three Forecasting

FIGURE 3.7 A centered moving average closely tracks the data

50

40

30

20

5

Period

10 15 20 25 300

D em

an d Centered

MA

Data

S O L U T I O N a.

b. The trend values are:

Period 9: Ft � 124 � 7.5(9)  � 191.5

Period 10: Ft � 124 � 7.5(10) � 199.0

Period 9 is a first quarter and period 10 is a second quarter. Multiplying each trend value by the appropriate quarter relative results in:

Period 9: 191.5(1.20)  � 229.8

Period 10: 199.0(1.10) � 218.9

Period Quarter Sales (gal.) �   Quarter Relative �

Deseasonalized Sales

1 1 158.4   1.20 � 132.0

2 2 153.0   1.10 � 139.1

3 3 110.0   0.75 � 146.7

4 4 146.3   0.95 � 154.0

5 1 192.0   1.20 � 160.0

6 2 187.0   1.10 � 170.0

7 3 132.0   0.75 � 176.0

8 4 173.8   0.95 � 182.9

Computing Seasonal Relatives. A widely used method for computing seasonal relatives involves the use of a centered moving average . This approach effectively accounts for any trend (linear or curvilinear) that might be present in the data. For example, Figure 3.7 illustrates how a three-period centered moving average closely tracks the data originally shown in Figure 3.3 .

Manual computation of seasonal relatives using the centered moving average method is a bit cumbersome, so the use of software is recommended. Manual computation is illustrated in Solved Problem 4 at the end of the chapter. The Excel template (on the Web site) is a simple and conve- nient way to obtain values of seasonal relatives (indexes). Example 8A illustrates this approach.

Centered moving average  A moving average positioned at the center of the data that were used to compute it.

e celx mhhe.com/stevenson12e

The manager of a call center recorded the volume of calls received between 9 and 10 a.m. for 21 days and wants to obtain a seasonal index for each day for that hour. Day Volume Day Volume Day Volume

Tues 67 Tues 60 Tues 64

Wed 75 Wed 73 Wed 76

Thurs 82 Thurs 85 Thurs 87

Fri 98 Fri 99 Fri 96

Sat 90 Sat 86 Sat 88

Sun 36 Sun 40 Sun 44

Mon 55 Mon 52 Mon 50

E X A M P L E 8 A

ste24102_ch03_074-133.indd 98ste24102_ch03_074-133.indd 98 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 99

S O L U T I O NCompute Seasonal Indexes <Back Number of "seasons" =

Tues Wed Thur Fri Sat Sun Mon

0.8688 1.0460 1.1980 1.3648 1.2383 0.5339 0.7484

0.8690 1.0463 1.1983 1.3652 1.2386 0.5341 0.7486

Season Average

Index Standard

Index

SeasonPeriod MAActual IndexCenter Tues1 67 Wed2 75 Thur3 82 Fri4 98 1.3638171 Sat5 90 1.2701613 Sun6 38 0.5101215 Mon7 55 0.7746479 Tues8 60 0.8433735 Wed9 73 1.034413 Thur10 85 1.1947791 Fri11 99 1.4 Sat12 86 1.2064128 Sun13 40 0.5577689 Mon14 62 0.7222222 Tues15 64 0.8942116 Wed16 76 1.0576541 Thur17 87 1.2011834 Fri18 96 1.3306931 Sat19 88 Sun20 44 Mon21

71.857143 70.857143 70.571429

71 71.142857 70.571429 71.142857 70.714286 71.285714 71.714286

72 71.571429 71.857143 72.428571 72.142857

71.857143 70.857143 70.571429

71 71.142857 70.571429 71.142857 70.714286 71.285714 71.714286

72 71.571429 71.857143 72.428571 72.142857

50

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

T u

es

W ed

T h

u r

F ri

S at

S u

n

M o

n

Clear

7

For practical purposes, you can round the relatives to two decimal places. Thus, the seasonal (standard) index values are:

Day Index

Tues 0.87

Wed 1.05

Thurs 1.20

Fri 1.37

Sat 1.24

Sun 0.53

Mon 0.75

Computing Seasonal Relatives Using the Simple Average Method. The simple average (SA) method is an alternative way to compute seasonal relatives. Each seasonal rela- tive is the average for that season divided by the average of all seasons. This method is illus- trated in Example 8B, where the seasons are days. Note that there is no need to standardize the relatives when using the SA method.

The obvious advantage of the SA method compared to the centered MA method is the simplicity of computations. When the data have a stationary mean (i.e., variation around an average), the SA method works quite well, providing values of relatives that are quite close

This example illustrates the steps needed to compute seasonal relatives using the SA method. E X A M P L E 8 B

ste24102_ch03_074-133.indd 99ste24102_ch03_074-133.indd 99 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

100 Chapter Three Forecasting

to those obtained using the centered MA method, which is generally accepted as accurate. Conventional wisdom is that the SA method should not be used when linear trend is present in the data. However, it can be used to obtain fairly good values of seasonal relatives as long as the ratio of the intercept to the slope is large, or when variations are large relative to the slope, as shown below. Also, the larger the ratio, the smaller the error. The general relationship is illustrated in the following figure.

Variations are large relative to the slope of the line, so it is okay to use the SA method.

Variations are small relative to the slope of the line, so it is not okay to use the SA method.

S O L U T I O N Step 1: Compute the season averages

Step 3: Compute the SA relatives

Step 2: Compute the overall average

Quarter Year 1 Year 2 Year 3 Quarter

Total Quarter Average

Quarter Relative

1 20 23 17 60 20 20/20  �  1.00

2 10 12 8 30 10 10/20  �  0.50

3 25 17 22 66 22 22/20  �  1.10

4 28 26 30 84 28 28/20  �   1.40

80 4.00

Average of quarter averages  �  80/4  �  20

Techniques for Cycles Cycles are up-and-down movements similar to seasonal variations but of longer duration—say, two to six years between peaks. When cycles occur in time-series data, their frequent irregu- larity makes it difficult or impossible to project them from past data because turning points are difficult to identify. A short moving average or a naive approach may be of some value, although both will produce forecasts that lag cyclical movements by one or several periods.

The most commonly used approach is explanatory: Search for another variable that relates to, and leads, the variable of interest. For example, the number of housing starts (i.e., permits to build houses) in a given month often is an indicator of demand a few months later for products and services directly tied to construction of new homes (landscaping; sales of wash- ers and dryers, carpeting, and furniture; new demands for shopping, transportation, schools). Thus, if an organization is able to establish a high correlation with such a leading variable (i.e., changes in the variable precede changes in the variable of interest), it can develop an equation that describes the relationship, enabling forecasts to be made. It is important that a persistent relationship exists between the two variables. Moreover, the higher the correlation, the better the chances that the forecast will be on target.

3.10 ASSOCIATIVE FORECASTING TECHNIQUES Associative techniques rely on identification of related variables that can be used to predict values of the variable of interest. For example, sales of beef may be related to the price per pound charged for beef and the prices of substitutes such as chicken, pork, and lamb; real

ste24102_ch03_074-133.indd 100ste24102_ch03_074-133.indd 100 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 101

estate prices are usually related to property location and square footage; and crop yields are related to soil conditions and the amounts and timing of water and fertilizer applications.

The essence of associative techniques is the development of an equation that summarizes the effects of predictor variables . The primary method of analysis is known as regression . A brief overview of regression should suffice to place this approach into perspective relative to the other forecasting approaches described in this chapter.

Simple Linear Regression The simplest and most widely used form of regression involves a linear relationship between two variables. A plot of the values might appear like that in Figure 3.8 . The object in linear regression is to obtain an equation of a straight line that minimizes the sum of squared vertical deviations of data points from the line (i.e., the least squares criterion ). This least squares line has the equation

y a bxc � � (3–13)

where

y c   �  Predicted (dependent) variable

x   �  Predictor (independent) variable

b   �  Slope of the line

a   �  Value of y c when x   �  0 (i.e., the height of the line at the y intercept)

( Note: It is conventional to represent values of the predicted variable on the y axis and values of the predictor variable on the x axis.) Figure 3.9 is a general graph of a linear regression line.

Predictor variables  Variables that can be used to predict values of the variable of interest.

Regression  Technique for fitting a line to a set of points.

Least squares line  Minimizes the sum of the squared vertical deviations around the line.

FIGURE 3.8 A straight line is fitted to a set of sample points

y

Predictor variable x0

P re

d ic

te d

v ar

ia b

le Computed relationship

LO3.14 Compute and use regression and correlation coefficients.

FIGURE 3.9 Equation of a straight line: The line represents the average (expected) values of variable y given values of variable x

y

x0

a x

y

x y

b =

yc = a + bx

The line intersects the y axis where y = a. The slope of the line = b.

D

D

D D

ste24102_ch03_074-133.indd 101ste24102_ch03_074-133.indd 101 11/9/13 2:28 PM11/9/13 2:28 PM

Final PDF to printer

102 Chapter Three Forecasting

The coefficients a and b of the line are based on the following two equations:

( ) ( )( )

( ) ( )2 2 b

n xy x y

n x x �

� � � �

� � � (3–14)

or ya y b x

n bx�

� � � � (3–15)

where

n   �  Number of paired observations

e celx mhhe.com/stevenson12e

Healthy Hamburgers has a chain of 12 stores in northern Illinois. Sales figures and profits for the stores are given in the following table. Obtain a regression line for the data, and predict profit for a store assuming sales of $10 million.

Unit Sales, x (in $ millions)

Profits, y (in $ millions)

$ 7 $0.15

2 0.10

6 0.13

4 0.15

14 0.25

15 0.27

16 0.24

12 0.20

14 0.27

20 0.44

15 0.34

7 0.17

E X A M P L E 9

S O L U T I O N First, plot the data and decide if a linear model is reasonable. (That is, do the points seem to scatter around a straight line? Figure 3.10 suggests they do.) Next, using the appropriate Excel template on the text Web site, obtain the regression equation yc � 0.0506 � 0.0159x (see Table 3.3). For sales of x � 10 (i.e., 10 million), estimated profit is yc � 0.0506 � 0.0159(10) � .2099, or $209,900. (Substituting x �  0 into the equation to produce a predicted profit of $50,600 may appear strange because it seems to suggest that amount of profit will occur with no sales. However, the value of x � 0 is outside the range of observed values. The regression line should be used only for the range of values from which it was developed; the relation- ship may be nonlinear outside that range. The purpose of the a value is simply to establish the height of the line where it crosses the y axis.)

50

40

30

20

10

0 2 4 6 8 10 12 14 16 18 20

Sales ($ millions)

P ro

fi ts

( $

te n

t h

o u

sa n

d s)

FIGURE 3.10 A linear model seems reasonable

ste24102_ch03_074-133.indd 102ste24102_ch03_074-133.indd 102 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 103

One indication of how accurate a prediction might be for a linear regression line is the amount of scatter of the data points around the line. If the data points tend to be relatively close to the line, predictions using the linear equation will tend to be more accurate than if the data points are widely scattered. The scatter can be summarized using the standard error of esti- mate . It can be computed by finding the vertical difference between each data point and the computed value of the regression equation for that value of x, squaring each difference, adding the squared differences, dividing by n   �  2, and then finding the square root of that value.

( )

2

2

S y y

n e

c �

� �

� (3–16)

where

S e   �  Standard error of estimate

y   �   y value of each data point

n   �  Number of data points

For the data given in Table 3.3 , the error column shows the y   �   y c differences. Squaring each error and summing the squares yields .01659. Hence, the standard error of estimate is

.01659

12 2 .0407 millionSe �

� �

One application of regression in forecasting relates to the use of indicators. These are uncontrollable variables that tend to lead or precede changes in a variable of interest. For example, changes in the Federal Reserve Board’s discount rate may influence certain business activities. Similarly, an increase in energy costs can lead to price increases for a wide range of products and services. Careful identification and analysis of indicators may yield insight into possible future demand in some situations. There are numerous published indexes and Web sites from which to choose. 3 These include:

Net change in inventories on hand and on order.

Interest rates for commercial loans.

3 See, for example, The National Bureau of Economic Research, The Survey of Current Business, The Monthly Labor Review, and Business Conditions Digest.

Standard error of estimate   A measure of the scatter of points around a regression line.

Simple Linear Regression <Back

Slope = 0 .0159 r = 0.9166657

Intercept = 0.0506008 r 2 = 0.840276

x y Forecast Error 7 0 .15 2 0 .1 6 0 .13 4 0 .15

14 0 .25 15 0 .27 16 0 .24 12 0 .2 14 0 .27 20 0 .44 15 0 .34 7 0 .17

x = 10 Δx = 1 Forecast: 0.2099031

0.21

0

0.05

0.1

0.15

0.2

0.25

0.3

0.35

0.4

0.45

0.5

0 5 10 15 20 25

X

Y

y Forecast

Clear

0.1621124 0.0824612 0.1461822 0.1143217 0.273624 0.2895543 0.3054845 0.2417636 0.273624 0.3692054 0.2895543 0.1621124

–0.0121124 0.0175388

–0.0161822 0.0356783 –0.023624

–0.0195543 –0.0654845 –0.0417636

–0.003624 0.0707946 0.0504457 0.0078876

TABLE 3.3 Using the Excel template for linear regression

ste24102_ch03_074-133.indd 103ste24102_ch03_074-133.indd 103 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

104 Chapter Three Forecasting

Industrial output.

Consumer price index (CPI).

The wholesale price index.

Stock market prices.

Other potential indicators are population shifts, local political climates, and activities of other firms (e.g., the opening of a shopping center may result in increased sales for nearby businesses). Three conditions are required for an indicator to be valid:

1. The relationship between movements of an indicator and movements of the variable should have a logical explanation.

2. Movements of the indicator must precede movements of the dependent variable by enough time so that the forecast isn’t outdated before it can be acted upon.

3. A fairly high correlation should exist between the two variables.

Correlation measures the strength and direction of relationship between two variables. Correlation can range from � 1.00 to � 1.00. A correlation of � 1.00 indicates that changes in one variable are always matched by changes in the other; a correlation of � 1.00 indicates that increases in one variable are matched by decreases in the other; and a correlation close to zero indicates little linear relationship between two variables. The correlation between two variables can be computed using the equation

( ) ( )( )

( ) ( ) ( ) ( )2 2 2 2 r

n xy x y

n x x n y y �

� � � �

� � � � � � (3–17)

The square of the correlation coefficient, r 2 , provides a measure of the percentage of vari- ability in the values of y that is “explained” by the independent variable. The possible values of r 2 range from 0 to 1.00. The closer r 2 is to 1.00, the greater the percentage of explained variation. A high value of r 2 , say .80 or more, would indicate that the independent variable is a good predictor of values of the dependent variable. A low value, say .25 or less, would indi- cate a poor predictor, and a value between .25 and .80 would indicate a moderate predictor.

Comments on the Use of Linear Regression Analysis Use of simple regression analysis implies that certain assumptions have been satisfied. Basi- cally, these are as follows:

1. Variations around the line are random. If they are random, no patterns such as cycles or trends should be apparent when the line and data are plotted.

2. Deviations around the average value (i.e., the line) should be normally distributed. A concentration of values close to the line with a small proportion of larger deviations supports the assumption of normality.

3. Predictions are being made only within the range of observed values.

If the assumptions are satisfied, regression analysis can be a powerful tool. To obtain the best results, observe the following:

1. Always plot the data to verify that a linear relationship is appropriate.

2. The data may be time-dependent. Check this by plotting the dependent variable versus time; if patterns appear, use analysis of time series instead of regression, or use time as an independent variable as part of a multiple regression analysis.

3. A small correlation may imply that other variables are important.

In addition, note these weaknesses of regression:

1. Simple linear regression applies only to linear relationships with one independent variable.

2. One needs a considerable amount of data to establish the relationship—in practice, 20 or more observations.

3. All observations are weighted equally.

Correlation  A measure of the strength and direction of rela- tionship between two variables.

ste24102_ch03_074-133.indd 104ste24102_ch03_074-133.indd 104 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 105

Sales of new houses and three-month lagged unemployment are shown in the following table. Determine if unemployment levels can be used to predict demand for new houses and, if so, derive a predictive equation.

Period ................................ 1 2 3 4 5 6 7 8 9 10 11

Units sold .......................... 20 41 17 35 25 31 38 50 15 19 14

Unemployment % (three-month lag) ..... 7.2 4.0 7.3 5.5 6.8 6.0 5.4 3.6 8.4 7.0 9.0

E X A M P L E 1 0 e celx

mhhe.com/stevenson12e

S O L U T I O N 1. Plot the data to see if a linear model seems reasonable. In this case, a linear model seems appropriate for the range of the data.

50

40

30

20

10

0 2 4 6 8 10

Level of unemployment (%), x

U n

it s

so ld

, y

2. Check the correlation coefficient to confirm that it is not close to zero using the Web site template, and then obtain the regression equation:

.966r � �

This is a fairly high negative correlation. The regression equation is

71.85 6.91y x� �

Note that the equation pertains only to unemployment levels in the range 3.6 to 9.0, because sample observations covered only that range.

ste24102_ch03_074-133.indd 105ste24102_ch03_074-133.indd 105 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

106 Chapter Three Forecasting

Nonlinear and Multiple Regression Analysis Simple linear regression may prove inadequate to handle certain problems because a linear model is inappropriate or because more than one predictor variable is involved. When non- linear relationships are present, you should employ nonlinear regression; models that involve more than one predictor require the use of multiple regression analysis. While these analyses are beyond the scope of this text, you should be aware that they are often used. Multiple regression forecasting substantially increases data requirements.

3.11 MONITORING FORECAST ERROR Many forecasts are made at regular intervals (e.g., weekly, monthly, quarterly). Because fore- cast errors are the rule rather than the exception, there will be a succession of forecast errors. Tracking the forecast errors and analyzing them can provide useful insight on whether fore- casts are performing satisfactorily.

There are a variety of possible sources of forecast errors, including the following:

1. The model may be inadequate due to ( a ) the omission of an important variable, ( b ) a change or shift in the variable that the model cannot deal with (e.g., sudden appearance of a trend or cycle), or ( c ) the appearance of a new variable (e.g., new competitor).

2. Irregular variations may occur due to severe weather or other natural phenomena, temporary shortages or breakdowns, catastrophes, or similar events.

3. Random variations. Randomness is the inherent variation that remains in the data after all causes of variation have been accounted for. There are always random variations.

A forecast is generally deemed to perform adequately when the errors exhibit only ran- dom variations. Hence, the key to judging when to reexamine the validity of a particular forecasting technique is whether forecast errors are random. If they are not random, it is necessary to investigate to determine which of the other sources is present and how to cor- rect the problem.

A very useful tool for detecting nonrandomness in errors is a control chart . Errors are plotted on a control chart in the order that they occur, such as the one depicted in Figure 3.11 . The centerline of the chart represents an error of zero. Note the two other lines, one above and one below the centerline. They are called the upper and lower control limits because they represent the upper and lower ends of the range of acceptable variation for the errors.

In order for the forecast errors to be judged “in control” (i.e., random), two things are necessary. One is that all errors are within the control limits. The other is that no patterns (e.g., trends, cycles, noncentered data) are present. Both can be accomplished by inspection. Figure 3.12 illustrates some examples of nonrandom errors.

Technically speaking, one could determine if any values exceeded either control limit without actually plotting the errors, but the visual detection of patterns generally requires plotting the errors, so it is best to construct a control chart and plot the errors on the chart.

Control chart  A visual tool for monitoring forecast errors.

LO3.15 Construct control charts and use them to monitor forecast errors.

FIGURE 3.11 Conceptual representation of a control chart

Lower control limit

0

+

Range of random

variability

Error

Upper control limit Normal distribution of forecast errors

Forecast error for period 8

0 1 2 3 4 5 6 7 8 Time Period

ste24102_ch03_074-133.indd 106ste24102_ch03_074-133.indd 106 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 107

To construct a control chart, first compute the MSE. The square root of MSE is used in practice as an estimate of the standard deviation of the distribution of errors. 4 That is,

MSEs � (3–18)

Control charts are based on the assumption that when errors are random, they will be dis- tributed according to a normal distribution around a mean of zero. Recall that for a normal distribution, approximately 95.5 percent of the values (errors in this case) can be expected to fall within limits of 0   2 s (i.e., 0   2 standard deviations), and approximately 99.7 percent of the values can be expected to fall within  3 s of zero. With that in mind, the following for- mulas can be used to obtain the upper control limit (UCL) and the lower control limit (LCL):

UCL: 0 MSE

LCL: 0 MSE

z

z

where

z   �  Number of standard deviations from the mean Combining these two formulas, we obtain the following expression for the control limits:

Control limits: 0 MSEz (3–19)

4The actual value could be computed as ( )

1 .

2

s e e

n �

� �

FIGURE 3.12 Examples of nonrandomness

Error above the upper control limit Trend

Cycling Bias (too many points on one side of the centerline)

Point beyond a control limit

Upper control limit

Lower control limit

Compute 2 s control limits for forecast errors when the MSE is 9.0. E X A M P L E 1 1

S O L U T I O N

MSE 3.0

UCL 0 2(3.0) 6.0

LCL 0 2(3.0) 6.0

s � �

� � � �

� � � �

ste24102_ch03_074-133.indd 107ste24102_ch03_074-133.indd 107 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

108 Chapter Three Forecasting

Another method is the tracking signal . It relates the cumulative forecast error to the aver- age absolute error (i.e., MAD). The intent is to detect any bias in errors over time (i.e., a tendency for a sequence of errors to be positive or negative). The tracking signal is computed period by period using the following formula:

Tracking signal (Actual Forecast )

MAD t

t t

t �

� � (3–20)

Values can be positive or negative. A value of zero would be ideal; limits of  4 or  5 are often used for a range of acceptable values of the tracking signal. If a value outside the acceptable range occurs, that would be taken as a signal that there is bias in the forecast, and that corrective action is needed.

After an initial value of MAD has been determined, MAD can be updated and smoothed (SMAD) using exponential smoothing:

SMAD MAD Actual Forecast MAD1 1t t t t )( − − −� � �� (3–21)

Tracking signal  The ratio of cumulative forecast error to the corresponding value of MAD, used to monitor a forecast.

Bias  Persistent tendency for forecasts to be greater or less than the actual values of a time series.

e celx mhhe.com/stevenson12e

Monthly attendance at financial planning seminars for the past 24 months, and forecasts and errors for those months, are shown in the following table. Determine if the forecast is working using these approaches:

1. A tracking signal, beginning with month 10, updating MAD with exponential smoothing. Use limits of  4 and �   �  .2.

2. A control chart with 2 s limits. Use data from the first eight months to develop the control chart, and then evaluate the remaining data with the control chart.

Month A

(Attendance) F

(Forecast) A   �   F (Error) | e |

Cumulative | e |

1 47 43 4 4 4

2 51 44 7 7 11

3 54 50 4 4 15

4 55 51 4 4 19

5 49 54 � 5 5 24

6 46 48 � 2 2 26

7 38 46 � 8 8 34

8 32 44 � 12 12 46

9 25 35 � 10 10 56

10 24 26 � 2 2 58

11 30 25 5 5

12 35 32 3 3

13 44 34 10 10

14 57 50 7 7

15 60 51 9 9

16 55 54 1 1

17 51 55 � 4 4

18 48 51 � 3 3

19 42 50 � 8 8

20 30 43 � 13 13

21 28 38 � 10 10

22 25 27 � 2 2

23 35 27 8 8

24 38 32 6 6

� 11

E X A M P L E 1 2

ste24102_ch03_074-133.indd 108ste24102_ch03_074-133.indd 108 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 109

S O L U T I O N 1. The sum of absolute errors through the 10th month is 58. Hence, the initial MAD is 58/10 � 5.8. The subsequent MADs are updated using the formula MADnew � MADold � �(|e|� MADold). The results are shown in the following table.

The tracking signal for any month is

Cumulative error at that month

Updated MAD at that month

t (Month) | e |

MADt � MADt � 1  � .2(| e |� MADt � 1)

Cumulative Error

Tracking Signal  � Cumulative  Errort � MADt

10 �20 �20/5.800 � �3.45

11 5 5.640 � 5.8 � .2(5 � 5.8) �15 �15/5.640 � �2.66

12 3 5.112 � 5.640 � .2(3 � 5.64) �12 �12/5.112 � �2.35

13 10 6.090 � 5.112 � .2(10 � 5.112) �2 �2/6.090 � �0.33

14 7 6.272 � 6.090 � .2(7 � 6.090) 5 5/6.272 �  0.80

15 9 6.818 � 6.272 � .2(9 � 6.272) 14 14/6.818 �  2.05

16 1 5.654 � 6.818 � .2(1 � 6.818) 15 15/5.654 �  2.65

17 4 5.323 � 5.654 � .2(4 � 5.654) 11 11/5.323 �  2.07

18 3 4.858 � 5.323 � .2(3 � 5.323) 8 8/4.858 �  1.65

19 8 5.486 � 4.858 � .2(8 � 4.858) 0 0/5.486 �  0.00

20 13 6.989 � 5.486 � .2(13 � 5.486) �13 �13/6.989 � �1.86

21 10 7.591 � 6.989 � .2(10 � 6.989) �23 �23/7.591 � �3.03

22 2 6.473 � 7.591 � .2(2 � 7.591) �25 �25/6.473 � �3.86

23 8 6.778 � 6.473 � .2(8 � 6.473) �17 �17/6.778 � �2.51

24 6 6.622 � 6.778 � .2(6 � 6.778) �11 �11/6.622 � �1.66

Because the tracking signal is within  4 every month, there is no evidence of a problem.

2. a. Make sure that the average error is approximately zero, because a large average would suggest a biased forecast.

Average error errors 11

24 .46

n �

� �

� � �

b. Compute the standard deviation:

MSE 1

4 7 4 4 ( 5) ( 2) ( 8) ( 12)

8 1 6.91

2

2 2 2 2 2 2 2 2

s e

n � �

� � � � � � � � � � � �

� �

c. Determine 2s control limits:

0 2s 0 2(6.91) 13.82 to 13.82 � � � �

d. (1) Check that all errors are within the limits. (They are.) (2) Plot the data (see the following graph), and check for nonrandom patterns. Note the

strings of positive and negative errors. This suggests nonrandomness (and that an improved forecast is possible). The tracking signal did not reveal this.

15 10 5 0

0 4 8 12 16 20 24

25

210 215

Month

E rr

o r

ste24102_ch03_074-133.indd 109ste24102_ch03_074-133.indd 109 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

110 Chapter Three Forecasting

Like the tracking signal, a control chart focuses attention on deviations that lie outside pre- determined limits. With either approach, however, it is desirable to check for possible patterns in the errors, even if all errors are within the limits.

If nonrandomness is found, corrective action is needed. That will result in less variability in forecast errors, and, thus, in narrower control limits. (Revised control limits must be com- puted using the resulting forecast errors.) Figure 3.13 illustrates the impact on control limits due to decreased error variability.

Comment The control chart approach is generally superior to the tracking signal approach. A major weakness of the tracking signal approach is its use of cumulative errors: Individual errors can be obscured so that large positive and negative values cancel each other. Con- versely, with control charts, every error is judged individually. Thus, it can be misleading to rely on a tracking signal approach to monitor errors. In fact, the historical roots of the tracking signal approach date from before the first use of computers in business. At that time, it was much more difficult to compute standard deviations than to compute average deviations; for that reason, the concept of a tracking signal was developed. Now computers and calculators can easily provide standard deviations. Nonetheless, the use of tracking signals has persisted, probably because users are unaware of the superiority of the control chart approach.

3.12 CHOOSING A FORECASTING TECHNIQUE Many different kinds of forecasting techniques are available, and no single technique works best in every situation. When selecting a technique, the manager or analyst must take a num- ber of factors into consideration.

The two most important factors are cost and accuracy. How much money is budgeted for generating the forecast? What are the possible costs of errors, and what are the benefits that might accrue from an accurate forecast? Generally speaking, the higher the accuracy, the higher the cost, so it is important to weigh cost–accuracy trade-offs carefully. The best fore- cast is not necessarily the most accurate or the least costly; rather, it is some combination of accuracy and cost deemed best by management.

Other factors to consider in selecting a forecasting technique include the availability of historical data; the availability of computer software; and the time needed to gather and ana- lyze data and to prepare the forecast. The forecast horizon is important because some tech- niques are more suited to long-range forecasts while others work best for the short range. For example, moving averages and exponential smoothing are essentially short-range techniques, since they produce forecasts for the next period. Trend equations can be used to project over much longer time periods. When using time-series data, plotting the data can be very helpful in choosing an appropriate method. Several of the qualitative techniques are well suited to

FIGURE 3.13 Removal of a pattern usually results in less variability, and, hence, narrower control limits

+

0

Before Time

+ 0 –

After Time

LO3.16 Describe the key factors and trade-offs to consider when choosing a forecasting technique.

A plot helps you to visualize the process and enables you to check for possible patterns (i.e., nonrandomness) within the limits that suggest an improved forecast is possible.5

5The theory and application of control charts and the various methods for detecting patterns in the data are cov- ered in more detail in Chapter 10, on quality control.

ste24102_ch03_074-133.indd 110ste24102_ch03_074-133.indd 110 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 111

long-range forecasts because they do not require historical data. The Delphi method and exec- utive opinion methods are often used for long-range planning. New products and services lack historical data, so forecasts for them must be based on subjective estimates. In many cases, experience with similar items is relevant. Table 3.4 provides a guide for selecting a forecasting method. Table 3.5 provides additional perspectives on forecasts in terms of the time horizon.

TABLE 3.4 A guide to selecting an appropriate forecasting method

Forecasting Method

Amount of Historical Data Data Pattern

Forecast Horizon

Preparation Time

Personnel Background

Moving average 2 to 30 observations Variation around an average

Short Short Little sophistication

Simple exponential smoothing

5 to 10 observations Variation around an average

Short Short Little sophistication

Trend-adjusted exponential smoothing

10 to 15 observations Trend Short to medium Short Moderate sophistication

Trend models 10 to 20; for seasonality at least 5 per season

Trend Short to medium Short Moderate sophistication

Seasonal Enough to see 2 peaks and troughs

Handles cyclical and seasonal patterns

Short to medium Short to moderate Little sophistication

Causal regression models

10 observations per independent variable

Can handle complex patterns

Short, medium, or long

Long development time, short time for implementation

Considerable sophistication

Source: Adapted from J. Holton Wilson and Deborah Allison-Koerber, “Combining Subjective and Objective Forecasts Improves Results,” Journal of Business Forecasting, Fall 1992, p. 4. Copyright © 1992 Institute of Business Forecasting. Used with permission.

TABLE 3.5 Forecast factors, by range of forecast Factor

Short Range

Intermediate Range

Long Range

1. Frequency Often Occasional Infrequent 2. Level of aggregation Item Product family Total output Type of

product/service 3. Type of model Smoothing Projection Managerial judgment Projection Seasonal Regression Regression 4. Degree of

management involvement

Low Moderate High

5. Cost per forecast Low Moderate High

In some instances, a manager might use more than one forecasting technique to obtain independent forecasts. If the different techniques produced approximately the same predic- tions, that would give increased confidence in the results; disagreement among the forecasts would indicate that additional analysis may be needed.

ste24102_ch03_074-133.indd 111ste24102_ch03_074-133.indd 111 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

112 Chapter Three Forecasting

3.13 USING FORECAST INFORMATION A manager can take a reactive or a proactive approach to a forecast. A reactive approach views forecasts as probable future demand, and a manager reacts to meet that demand (e.g., adjusts production rates, inventories, the workforce). Conversely, a proactive approach seeks to actively influence demand (e.g., by means of advertising, pricing, or product/service changes).

Generally speaking, a proactive approach requires either an explanatory model (e.g., regression) or a subjective assessment of the influence on demand. A manager might make two forecasts: one to predict what will happen under the status quo and a second one based on a “what if” approach, if the results of the status quo forecast are unacceptable.

3.14 COMPUTER SOFTWARE IN FORECASTING Computers play an important role in preparing forecasts based on quantitative data. Their use allows managers to develop and revise forecasts quickly, and without the burden of manual computations. There is a wide range of software packages available for forecasting. The Excel templates on the text Web site are an example of a spreadsheet approach. There are templates for moving averages, exponential smoothing, linear trend equation, trend-adjusted exponen- tial smoothing, and simple linear regression. Some templates are illustrated in the Solved Problems section at the end of the chapter.

SCREENCAM TUTORIAL

e celx mhhe.com/stevenson12e

3.15 OPERATIONS STRATEGY

Forecasts are the basis for many decisions and an essential input for matching supply and demand. Clearly, the more accurate an organization’s forecasts, the better prepared it will be to take advan- tage of future opportunities and reduce potential risks. A worthwhile strategy can be to work to improve short-term forecasts. Better short-term forecasts will not only enhance profits through lower inventory levels, fewer shortages, and improved customer service, they also will enhance forecasting credibility throughout the organization: If short-term forecasts are inaccurate, why should other areas of the organization put faith in long-term forecasts? Also, the sense of con- fidence accurate short-term forecasts would generate would allow allocating more resources to strategic and medium- to longer-term planning and less on short-term, tactical activities.

Maintaining accurate, up-to-date information on prices, demand, and other variables can have a significant impact on forecast accuracy. An organization also can do other things to improve forecasts. These do not involve searching for improved techniques but relate to the inverse relation of accuracy to the forecast horizon: Forecasts that cover shorter time frames tend to be more accurate than longer-term forecasts. Recognizing this, management might choose to devote efforts to shortening the time horizon that forecasts must cover. Essentially, this means shortening the lead time needed to respond to a forecast. This might involve build- ing flexibility into operations to permit rapid response to changing demands for products and services, or to changing volumes in quantities demanded; shortening the lead time required to obtain supplies, equipment, and raw materials or the time needed to train or retrain employ- ees; or shortening the time needed to develop new products and services.

Lean systems are demand driven; goods are produced to fulfill orders rather than to hold in inventory until demand arises. Consequently, they are far less dependent on short-term fore- casts than more traditional systems.

In certain situations forecasting can be very difficult when orders have to be placed far in advance. This is the case, for example, when demand is sensitive to weather conditions, such as the arrival of spring, and there is a narrow window for demand. Orders for products or

(continued)

ste24102_ch03_074-133.indd 112ste24102_ch03_074-133.indd 112 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 113

goods to produce. The manufacturing company wants to make sure all or much of its finished product moves off the store shelves or dealer lots as quickly as pos- sible. Unsold products represent millions of dollars tied up in inventory.

The flip side of this equation is the millions of dollars invested in PPE to manufacture the finished products. The company and its supporting supply chain must utilize as close to 100 percent of its PPE investments. Some manufacturing plants make products in lots of 100 or 1,000. Gen- erally, it’s cost prohibitive to have production runs of one unit. So how do you extract maximum value from your investments and avoid having money tied up in unsold inventory?

DF and supply chain management (SCM) technologies try to solve this problem by generating a production plan to meet forecasted demand and extract maximum value from PPE, while reducing the amount of capital tied up in inventory. Usually, the demand forecast is pretty close to the actual outcomes, but there are times when demand forecasts don’t match the outcomes. In addition to unforeseen eco- nomic events, a new product introduction may be a stellar success or an abysmal failure. In the case of a phenomenal success, the manufac- turing plant may not be able to meet demand for its product.

Consider the case of the Chrysler PT Cruiser. It succeeded way beyond the demand forecast’s projections. Should it have started with manufacturing capacity to fulfill the runaway demand? Absolutely not. Given the additional millions of dollars of investment in PPE necessary to add that capacity, it would’ve backfired if the PT Cruiser had been a flop. The value provided by DF and supporting SCM technologies in this instance was the ability to add capacity to meet the amended forecast based on actual events. Demand forecasts can and do frequently miss their targets. The point to underscore here is that the underlying DF and supporting SCM technologies are critical to a company’s ability to react and respond in a coordinated manner when market conditions change.

The manufacturing company and its supply chain are able to ben- efit from sharing information about the changed market conditions and responding to them in a coordinated manner. Despite best practices embedded in DF and SCM technologies to support this manner of col- laboration, it plays out differently in the real world.

Ram Reddy

Disregarding Demand Forecasting Technologies during Tough Economic Times Can Be a Costly Mistake It’s no secret that the IT sector has felt the brunt of the economic down- turn. Caught up in the general disillusionment with IT has been demand forecasting (DF) technologies. Many companies blame DF technologies for supply chain problems such as excess inventory. Pinning the blame on and discontinuing DF technologies is the equivalent of throwing out the baby with the bathwater. The DF misunderstanding stems from the fact that, despite sophisticated mathematical models and underlying technologies, the output from these systems is, at best, an educated guess about the future.

A forecast from these systems is only as good as the assumptions and data used to build the forecast. Even the best forecast fails when an unexpected event—such as a recession—clobbers the underlying assumptions. However, this doesn’t imply that DF technologies aren’t delivering the goods. But, unfortunately, many DF and supply chain tech- nology implementations have recently fallen victim to this mindset. DF is part science and part art (or intuition)—having the potential to significantly impact a company’s bottom line. In this column, you’ll find an overview of how DF is supposed to work and contrast that with how most companies actually practice it. I’ll conclude with suggestions on how to avoid common mistakes implementing and using this particular class of technologies.

The Need for DF Systems DF is crucial to minimizing working capital and associated expenses and extracting maximum value from a company’s capital investments in property, plant, and equipment (PPE). It takes a manufacturing com- pany a lot of lead time to assemble and stage the raw materials and components to manufacture a given number of products per day. The manufacturing company, in turn, generates its sales forecast numbers using data from a variety of sources such as distribution channels, fac- tory outlets, value-added resellers, historical sales data, and general macroeconomic data. Manufacturing companies can’t operate without a demand forecast because they won’t know the quantities of finished

READING Gazing at the Crystal Ball

ts as quickly as pos

ny yyy ed

services that relate to this (e.g., garden materials, advertising space) often have to be placed many months in advance—far beyond the ability of forecasters to accurately predict weather conditions and, hence, the timing of demand. In such cases, there may be pressures from salespeople who want low quotas and financial people who don’t want to have to deal with the cost of excess inventory to have conservative forecasts. Conversely, operations people may want more optimistic forecasts to reduce the risk of being blamed for possible shortages.

Sharing forecasts or demand data throughout the supply chain can improve forecast qual- ity in the supply chain, resulting in lower costs and shorter lead times. For example, both Hewlett-Packard and IBM require resellers to include such information in their contracts.

The following reading provides additional insights on forecasting and supply chains.

(continued)

(concluded)

ste24102_ch03_074-133.indd 113ste24102_ch03_074-133.indd 113 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

114 Chapter Three Forecasting

make educated estimates about future sales. These SMEs could range from distribution outlet owners to sales and marketing gurus and econo- mists. Their intuition is typically combined with data (such as historical sales figures) to generate the forecast for the next quarter or year. During a recession, the SMEs tend to get overly pessimistic. The demand fore- casts generated from this mindset lead to inventory shortages when the economy recovers. Similarly, during an economic expansion, the SMEs tend to have an overly rosy picture of the future. This optimism leads to inventory gluts when the economy starts to slow down. In both instances, blaming and invalidating DF and SCM technologies is counterproductive in the long run.

It’s very rare that a demand forecast and the actual outcome match 100 percent. If it’s close enough to avoid lost sales or create an excess inventory situation, it’s deemed a success. DF and supporting SCM tech- nologies are supposed to form a closed loop with actual sales at the cash register providing a feedback mechanism. This feedback is especially essential during economic upturns or downturns. It provides the neces- sary information to a company and its supply chain to react in a coordi- nated and efficient manner.

Don’t let the current disillusionment with DF and SCM technologies impede the decision-making process within your company. The intelli- gent enterprise needs these technologies to effectively utilize its capital resources and efficiently produce to meet its sales forecasts.

Ram Reddy is the author of Supply Chains to Virtual Integration (McGraw-Hill, 2001). He is the president of Tactica Consulting Group, a technology and business strategy consulting company.

Questions

1. What is DF and why is it important? 2. Why might a company executive make bold predictions about future

demand to Wall Street analysts? 3. How might an executive’s comments to Wall Street analysts affect

demand forecasts, and what are the consequences of doing so?

Source: Ram Reddy, “Gazing at the Crystal Ball,” Intelligent Enterprise, June 13, 2002. Copyright © 2002 Pention Media, Inc. Used with permission.

How It Works in Real Life— Worst Practices A company prepares its forecast by taking into account data about past sales, feedback from distribution channels, qualitative assessments from field sales managers, and macroeconomic data. DF and SCM technologies take these inputs and add existing capacities within the company and across the supply chain to generate a production plan for optimum financial performance.

There’s been incredible pressure on executives of publicly traded companies to keep up stock prices. This pressure, among other rea- sons, may cause manufacturing company executives to make bold pro- jections to external financial analysts (or Wall Street) about future sales without using the demand forecast generated from the bottom up. When the company realizes this disparity between the initial projection and the forecast, the forecast is changed to reflect the projections made by the company’s officers, negating its accuracy.

The company arbitrarily sets sales targets for various regions to meet Wall Street numbers that are totally out of sync with input provided by the regional sales managers for the DF process. Even though the regional sales managers’ input may have a qualitative element (art), they tend to be more accurate, given their proximity to the customers in the region. Unfortunately, the arbitrary sales targets make their way back to the supply chain, and the result is often excessive inventory build-up starting at the distribution channels to the upstream suppliers.

Seeing the inventory pile up, the manufacturing company may decide to shut down a production line. This action affects upstream suppliers who had procured raw materials and components to meet the execu- tive-mandated production numbers, which may cause them to treat any future forecasted numbers with suspicion. Most cost efficiencies that could be obtained through planned procurement of raw materials and components go out the window. It’s very likely that the companies try to blame DF and SCM technologies for failing to provide a responsive and efficient supply chain, even though the fault may lie in the company’s misuse of the technologies and not the technologies themselves.

Guarding against the Extremes Earlier in this column, I said that DF is part art or intuition and part sci- ence. The art/intuition part comes in when subject-matter experts (SMEs)

Forecasts are vital inputs for the design and the operation of the productive systems because they help managers to anticipate the future.

Forecasting techniques can be classified as qualitative or quantitative. Qualitative techniques rely on judgment, experience, and expertise to formulate forecasts; quantitative techniques rely on the use of historical data or associations among variables to develop forecasts. Some of the techniques are simple, and others are complex. Some work better than others, but no technique works all the time. Moreover, all forecasts include a certain degree of inaccuracy, and allowance should be made for this. The techniques generally assume that the same underlying causal system that existed in the past will continue to exist in the future.

The qualitative techniques described in this chapter include consumer surveys, salesforce estimates, executive opinions, and manager and staff opinions. Two major quantitative approaches are described: analysis of time-series data and associative techniques. The time-series techniques rely strictly on the examination of historical data; predictions are made by projecting past movements of a variable into

SUMMARY

(concluded)

ste24102_ch03_074-133.indd 114ste24102_ch03_074-133.indd 114 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 115

the future without considering specific factors that might influence the variable. Associative techniques attempt to explicitly identify influencing factors and to incorporate that information into equations that can be used for predictive purposes.

All forecasts tend to be inaccurate; therefore, it is important to provide a measure of accuracy. It is possible to compute several measures of forecast accuracy that help managers to evaluate the perfor- mance of a given technique and to choose among alternative forecasting techniques. Control of forecasts involves deciding whether a forecast is performing adequately, typically using a control chart.

When selecting a forecasting technique, a manager must choose a technique that will serve the intended purpose at an acceptable level of cost and accuracy.

The various forecasting techniques are summarized in Table 3.6 . Table 3.7 lists the formulas used in the forecasting techniques and in the methods of measuring their accuracy. Note that the Excel templates on the text Web site that accompanies this book are especially useful for tedious calculations.

TABLE 3.6 Forecasting approaches

Approaches Brief Description

Judgment/opinion: Consumer surveys Questioning consumers on future plans Direct-contact composites Joint estimates obtained from salespeople or customer service people Executive opinion Finance, marketing, and manufacturing managers join to prepare forecast Delphi technique Series of questionnaires answered anonymously by knowledgeable people; succes-

sive questionnaires are based on information obtained from previous surveys Outside opinion Consultants or other outside experts prepare the forecast Statistical: Time series: Naive Next value in a series will equal the previous value in a comparable period Moving averages Forecast is based on an average of recent values Exponential smoothing Sophisticated form of weighted moving average Associative models: Simple regression Values of one variable are used to predict values of a dependent variable Multiple regression Two or more variables are used to predict values of a dependent variable

TABLE 3.7 Summary of formulas Technique Formula Definitions

MAD

∑ e n

n

MAD �

MAD  �  Mean absolute deviation e   �  Error,  A   �   F n   �  Number of errors

MSE ∑e n

n

MSE 1

2

� �

MSE  �  Mean squared error n   �  Number of errors

1. Demand forecasts are essential inputs for many business decisions; they help managers decide how much supply or capacity will be needed to match expected demand, both within the organization and in the supply chain.

2. Because of random variations in demand, it is likely that the forecast will not be perfect, so managers need to be prepared to deal with forecast errors.

3. Other, nonrandom factors might also be present, so it is necessary to monitor forecast errors to check for nonrandom patterns in forecast errors.

4. It is important to choose a forecasting technique that is cost-effective and one that minimizes forecast error.

KEY POINTS

ste24102_ch03_074-133.indd 115ste24102_ch03_074-133.indd 115 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

116 Chapter Three Forecasting

Technique Formula Definitions

MAPE

e

n

t

tMAPE Actual

100 n

MAPE  �  Mean absolute percent error n   �  Number of errors

Moving average forecast

=

∑ = −F A

n t

i

n

t i1

A   �  Demand in period  t   �   i n   �  Number of periods

Weighted average Ft � wt – n (At – n) � . . . � wt � 2 (At � 2) � wt � 1

(At � 1) � wt � 1 (At � 1) � . . . � wt – n (At – n) W t   �  Weight for the period  t A t   �  Actual value in period  t

Exponential smoothing forecast Ft � Ft � 1 � �(At � 1 � Ft � 1) �   �  Smoothing factor

Linear trend forecast

Ft � a � bt where

b n ty t y n t t

a y b t

n y bt

( )

or

2 2� � � � �

� � �

� � � �

a   �   y   intercept b   �  Slope

Trend-adjusted forecast

TAFt � 1 � St � Tt where

S A T T T

t t t t

t t t t t

TAF ( TAF )

(TAF TAF )1 1 1

� � � �

� � � � �� � �

t   �  Current period TAF t   �  1   �   Trend-adjusted forecast for

next period S   �   Previous forecast plus

smoothed error T   �  Trend component

Linear regression forecast

Yc � a � bx where

b n xy x y

n x x

a y b x

n y bx

( ) ( )( )

( ) ( )

or

2 2� � � � �

� � �

� � � �

y c   �  Computed value of dependent variable

x   �  Predictor (independent) variable b   �  Slope of the line a   �  Value of  y c  when  x   �  0

Standard error of estimate

S

y y n

e c( )

2

2

� � �

S e   �  Standard error of estimate y   �   y  value of each data point n   �  Number of data points

Tracking signal

∑e t

n

TS MAD

Control limits

z

z

UCL 0 MSE

LCL 0 MSE

� �

� �

MSE standard deviation

Number of standard deviations;

2 and 3 are typical values

z

ste24102_ch03_074-133.indd 116ste24102_ch03_074-133.indd 116 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 117

associative model, 82 bias, 108 centered moving average, 98 control chart, 106 correlation, 104 cycle, 84 Delphi method, 83 error, 80 exponential smoothing, 89 focus forecasting, 91 forecast, 75 irregular variation, 84

judgmental forecasts, 82 least squares line, 101 linear trend equation, 92 mean absolute deviation (MAD), 81 mean absolute percent error (MAPE), 81 mean squared error (MSE), 81 moving average, 86 naive forecast, 84 predictor variables, 101 random variations, 84

regression, 101 seasonal relative, 97 seasonal variations, 95 seasonality, 84 standard error of estimate, 103 time series, 84 time-series forecasts, 82 tracking signal, 108 trend, 84 trend-adjusted exponential smoothing, 95 weighted average, 88

KEY TERMS

SOLVED PROBLEMS

Forecasts based on averages. Given the following data:

Period Number of Complaints

1 60 2 65 3 55 4 58 5 64

Prepare a forecast for period 6 using each of these approaches:

a. The appropriate naive approach.

b. A three-period moving average.

c. A weighted average using weights of .50 (most recent), .30, and .20.

d. Exponential smoothing with a smoothing constant of .40.

Problem 1

Solution Step by step

a. Plot the data to see if there is a pattern. Here we have only variations around an average (i.e., no trend or cycles). Therefore, the most recent value of the series becomes the next forecast: 64.

b. Use the latest values. MA 55 58 64

3 593 �

� � �

c. F   �  .20(55)  �  .30(58)  �  .50(64)  �  60.4

d. Start with period 2. Use the data in period 1 as the forecast for period 2, and then use exponential smoothing for successive forecasts.

Period Number of Complaints Forecast Calculations

1 60 [The previous value of the series is used 2 65 60 as the starting forecast.]

3 55 62 60 � .40(65 � 60) � 62

4 58 59.2 62 � .40(55 � 62) � 59.2

5 64 58.72 59.2 � .40(58 � 59.2) � 58.72

6 60.83 58.72 � .40(64 � 58.72) � 60.83

ste24102_ch03_074-133.indd 117ste24102_ch03_074-133.indd 117 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

118 Chapter Three Forecasting

You also can obtain the forecasts and a plot using an Excel template, as shown:e celx mhhe.com/stevenson12e

Using seasonal relatives. Apple’s Citrus Fruit Farm ships boxed fruit anywhere in the world. Using the following information, a manager wants to forecast shipments for the first four months of next year.

Month Seasonal Relative Month

Seasonal Relative

Jan. 1.2 Jul. 0.8 Feb. 1.3 Aug. 0.6 Mar. 1.3 Sep. 0.7 Apr. 1.1 Oct. 1.0 May. 0.8 Nov. 1.1 Jun. 0.7 Dec. 1.4

The monthly forecast equation being used is:

402 3F tt � �

where t 0   �  January of  last  year

F t   �  Forecast of shipments for month  t

Problem 2

e celx mhhe.com/stevenson12e

Solution a. Determine trend amounts for the first four months of next year: January, t   �  24; February, t   �  25; etc. Thus,

402 3(24) 474

402 3(25) 477

402 3(26) 480

402 3(27) 483

Jan

Feb

Mar

Apr

F

F

F

F

� � �

� � �

� � �

� � �

b. Multiply each monthly trend by the corresponding seasonal relative for that month.

Month Seasonal Relative Forecast

Jan. 1.2 474(1.2) � 568.8 Feb. 1.3 477(1.3) � 620.1 Mar. 1.3 480(1.3) � 624.0 Apr. 1.1 483(1.1) � 531.3

ste24102_ch03_074-133.indd 118ste24102_ch03_074-133.indd 118 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 119

Linear trend line. Plot the data on a graph, and verify visually that a linear trend line is appropriate. Develop a linear trend equation for the following data. Then use the equation to predict the next two values of the series.

Problem 3

Solution Period Demand 1 44 2 52 3 50 4 54 5 55 6 55 7 60 8 56 9 62

A plot of the data indicates that a linear trend line is appropriate:

65

60

55

50

45

2 4 6 8 10

Period

D em

an d

1 3 5 7 9 11

Trend line

Period, t t 2

Demand, y ty

1 1 44 44 2 4 52 104 3 9 50 150 � t � 45 and � t 2 � 285 4 16 54 216 5 25 55 275 6 36 55 330 7 49 60 420 8 64 56 448

9 81 62 558 45 285 488 2,545

( )

9(2,545) 45(488)

9(285) 45(45) 1.75

488 1.75(45)

9 45.47

2 2b n ty t y

n t t

a y b t

n

� � � � �

� � � �

� �

� � � �

� �

Thus, the trend equation is Ft   �  45.47  �  1.75 t. The next two forecasts are:

45.47 1.75(10) 62.97

45.47 1.75(11) 64.72

10

11

F

F

� � �

� � �

ste24102_ch03_074-133.indd 119ste24102_ch03_074-133.indd 119 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

120 Chapter Three Forecasting

You also can use an Excel template to obtain the coefficients and a plot. Simply replace the existing data in the template with your data.

Seasonal relatives. Obtain estimates of quarter relatives for these data using the centered moving average method:

YEAR

1 2 3 4

Quarter: 1 2 3 4 1 2 3 4 1 2 3 4 1 Demand: 14 18 35 46 28 36 60 71 45 54 84 88 58

Problem 4

e celx mhhe.com/stevenson12e

Solution Note that each season has an even number of data points. When an even-numbered moving average is used (in this case, a four-period moving average), the “centered value” will not correspond to an actual data point; the center of 4 is between the second and third data points. To correct for this, a sec- ond set of moving averages must be computed using the MA 4 values. The MA 2 values are centered between the MA 4 and “line up” with actual data points. For example, the first MA 4 value is 28.25. It is centered between 18 and 35 (i.e., between quarter 2 and quarter 3). When the average of the first two MA 4 values is taken (i.e., MA 2 ) and centered, it lines up with the 35 and, hence, with quarter 3.

So, whenever an even-numbered moving average is used as a centered moving average (e.g., MA 4 , MA 12 ), a second moving average, a two-period moving average, is used to achieve correspon- dence with periods. This procedure is not needed when the number of periods in the centered moving average is odd.

Year Quarter Demand MA4 MA2 Demand/MA2 1 1 14

2 18 28.25 31.75 36.25 42.50 48.75 53.00 57.50 63.50 67.75 71.00

3 35 30.00 1.17 4 46 34.00 1.35

2 1 28 39.38 0.71 2 36 45.63 0.79 3 60 50.88 1.18 4 71 55.25 1.29

3 1 45 60.50 0.74 2 54 65.63 0.82 3 84 69.38 1.21 4 88

4 1 58

ste24102_ch03_074-133.indd 120ste24102_ch03_074-133.indd 120 11/10/13 5:10 PM11/10/13 5:10 PM

Final PDF to printer

Chapter Three Forecasting 121

QUARTER

1 2 3 4

0.71 0.79 1.17 1.35 0.74 0.82 1.18 1.29 1.45 1.61 1.21 2.64

3.56 Average for the quarter: 0.725 0.805 1.187 1.320

The sum of these relatives is 4.037. Multiplying each by 4.00/4.037 will standardize the relatives, making their total equal 4.00. The resulting relatives are quarter 1, .718; quarter 2, .798; quarter 3, 1.176; quarter 4, 1.308.

Problem 5 Regression line. A large midwestern retailer has developed a graph that summarizes the effect of advertising expenditures on sales volume. Using the graph, determine an equation of the form y   �   a   �   bx that describes this relationship.

3

2

1

2 4 6 8 10 x

Advertising ($ thousands)

S al

es (

$ m

ill io

n s)

Solution The linear equation has the form y   �   a   �   bx, where a is the value of y when x   �  0 (i.e., where the line intersects the y axis) and b is the slope of the line (the amount by which y changes for a one-unit change in x ).

Accordingly, a   �  1 and b   �  (3  �  1)/(10  �  0)  �  .2, so y   �   a   �   bx becomes y   �  1  �  .2 x. [ Note: (3  �  1) is the change in y, and (10  �  0) is the change in x. ]

Problem 6 Regression analysis. The owner of a small hardware store has noted a sales pattern for window locks that seems to parallel the number of break-ins reported each week in the newspaper. The data are:

Sales: 46 18 20 22 27 34 14 37 30

Break-ins: 9 3 3 5 4 7 2 6 4

a. Plot the data to determine which type of equation, linear or nonlinear, is appropriate.

b. Obtain a regression equation for the data.

c. Estimate average sales when the number of break-ins is five.

Solution a. 60

40

20

0 2 4 6 8 10

Number of break-ins

S al

es

The graph supports a linear relationship.

ste24102_ch03_074-133.indd 121ste24102_ch03_074-133.indd 121 11/10/13 5:11 PM11/10/13 5:11 PM

Final PDF to printer

122 Chapter Three Forecasting

b. You can obtain the regression coefficients using the appropriate Excel template. Simply replace the existing data for x and y with your data. Note: Be careful to enter the values for the variable you want to predict as y values. In this problem, the objective is to predict sales, so the sales val- ues are entered in the y column. The equation is y c   �  7.129  �  4.275 x.

e celx mhhe.com/stevenson12e

c. For x   �  5,  y c   �  7.129  �  4.275(5)  �  28.50.

Problem 7 Accuracy of forecasts. The manager of a large manufacturer of industrial pumps must choose between two alternative forecasting techniques. Both techniques have been used to prepare forecasts for a six- month period. Using MAD as a criterion, which technique has the better performance record?

FORECAST

Month Demand Technique 1 Technique 2

1 492 488 495 2 470 484 482 3 485 480 478 4 493 490 488 5 498 497 492 6 492 493 493

e celx mhhe.com/stevenson12e

Solution Check that each forecast has an average error of approximately zero. (See computations that follow.)

Month Demand Technique 1 e | e | Technique 2 e | e |

1 492 488 4 4 495 �3 3 2 470 484 �14 14 482 �12 12 3 485 480 5 5 478 7 7 4 493 490 3 3 488 5 5 5 498 497 1 1 492 6 6 6 492 493 �1 1 493 �1 1

�2 28 �2 34

MAD 28

6 4.67

MAD 34

6 5.67

1

2

e

n e

n

� �

� �

� �

� �

ste24102_ch03_074-133.indd 122ste24102_ch03_074-133.indd 122 11/10/13 5:11 PM11/10/13 5:11 PM

Final PDF to printer

Chapter Three Forecasting 123

Technique 1 is superior in this comparison because its MAD is smaller, although six observations would generally be too few on which to base a realistic comparison.

Problem 8 Control chart. Given the demand data that follow, prepare a naive forecast for periods 2 through 10. Then determine each forecast error, and use those values to obtain 2 s control limits. If demand in the next two periods turns out to be 125 and 130, can you conclude that the forecasts are in control?

Period: 1 2 3 4 5 6 7 8 9 10

Demand: 118 117 120 119 126 122 117 123 121 124

Solution For a naive forecast, each period’s demand becomes the forecast for the next period. Hence, the forecasts and errors are:

Period Demand Forecast Error Error2

1 118 — — — 2 117 118 �1 1 3 120 117 3 9 4 119 120 �1 1 5 126 119 7 49 6 122 126 �4 16 7 117 122 �5 25 8 123 117 6 36 9 121 123 �2 4

10 124 121 3 9 �6 150

Error

1

150

9 1 4.33 ( Number of errors)

2

s n

n� �

� �

� � �

The control limits are 2(4.33)  �   �  8.66. The forecast for period 11 was 124. Demand turned out to be 125, for an error of 125  �  124  �   � 1.

This is within the limits of �  8.66. If the next demand is 130 and the naive forecast is 125 (based on the period 11 demand of 125), the error is � 5. Again, this is within the limits, so you cannot con- clude the forecast is not working properly. With more values—at least five or six—you could plot the errors to see whether you could detect any patterns suggesting the presence of nonrandomness.

DISCUSSION AND REVIEW QUESTIONS

1. What are the main advantages that quantitative techniques for forecasting have over qualitative techniques? What limitations do quantitative techniques have?

2. What are some of the consequences of poor forecasts? Explain.

3. List the specific weaknesses of each of these approaches to developing a forecast: a. Consumer surveys. b. Salesforce composite. c. Committee of managers or executives.

4. Why are forecasts generally wrong?

5. What is the purpose of establishing control limits for forecast errors?

6. What factors would you consider in deciding whether to use wide or narrow control limits for forecasts?

7. Contrast the use of MAD and MSE in evaluating forecasts.

8. What advantages as a forecasting tool does exponential smoothing have over moving averages?

9. How does the number of periods in a moving average affect the responsiveness of the forecast?

10. What factors enter into the choice of a value for the smoothing constant in exponential smoothing?

11. How accurate is your local five-day weather forecast? Support your answer with actual data.

12. Explain how using a centered moving average with a length equal to the length of a season elimi- nates seasonality from a time series.

13. Contrast the terms sales and demand.

ste24102_ch03_074-133.indd 123ste24102_ch03_074-133.indd 123 11/29/13 1:03 AM11/29/13 1:03 AM

Final PDF to printer

124 Chapter Three Forecasting

14. Contrast the reactive and proactive approaches to forecasting. Give several examples of types of organizations or situations in which each type is used.

15. Explain how flexibility in production systems relates to the forecast horizon and forecast accuracy.

16. How is forecasting in the context of a supply chain different from forecasting for just a single organization? List possible supply chain benefits and discuss potential difficulties in doing supply chain forecasting.

17. Which type of forecasting approach, qualitative or quantitative, is better?

18. Suppose a software producer is about to release a new version of its popular software. What infor- mation do you think it would take into account in forecasting initial sales?

19. Choose the type of forecasting technique (survey, Delphi, averaging, seasonal, naive, trend, or associative) that would be most appropriate for predicting a. Demand for Mother’s Day greeting cards. b. Popularity of a new television series. c. Demand for vacations on the moon. d. The impact a price increase of 10 percent would have on sales of orange marmalade. e. Demand for toothpaste in a particular supermarket.

1. It has been said that forecasting using exponential smoothing is like driving a car by looking in the rear-view mirror. What are the conditions that would have to exist for driving a car that are analo- gous to the assumptions made when using exponential smoothing?

2. What capability would an organization have to have to not need forecasts?

3. When a new business is started, or a patent idea needs funding, venture capitalists or investment bankers will want to see a business plan that includes forecast information related to a profit and loss statement. What type of forecasting information do you suppose would be required?

4. Discuss how you would manage a poor forecast.

5. Omar has heard from some of his customers that they will probably cut back on order sizes in the next quarter. The company he works for has been reducing its sales force due to falling demand and he worries that he could be next if his sales begin to fall off. Believing that he may be able to con- vince his customers not to cut back on orders, he turns in an optimistic forecast of his next quarter sales to his manager. What are the pros and cons of doing that?

6. Give three examples of unethical conduct involving forecasting and the ethical principle each violates.

CRITICAL THINKING EXERCISES

1. Explain the trade-off between responsiveness and stability in a forecasting system that uses time-series data.

2. Who needs to be involved in preparing forecasts?

3. How has technology had an impact on forecasting?

TAKING STOCK

1. A commercial bakery has recorded sales (in dozens) for three products, as shown below: PROBLEMS

Day Blueberry Muffins

Cinnamon Buns Cupcakes

1 30 18 45 2 34 17 26 3 32 19 27 4 34 19 23 5 35 22 22 6 30 23 48 7 34 23 29 8 36 25 20 9 29 24 14

10 31 26 18 11 35 27 47 12 31 28 26 13 37 29 27 14 34 31 24 15 33 33 22

ste24102_ch03_074-133.indd 124ste24102_ch03_074-133.indd 124 11/10/13 5:11 PM11/10/13 5:11 PM

Final PDF to printer

Chapter Three Forecasting 125

a. Predict orders for the following day for each of the products using an appropriate naive method. Hint: Plot each data set.

b. What should the use of sales data instead of demand imply?

2. National Scan, Inc., sells radio frequency inventory tags. Monthly sales for a seven-month period were as follows:

Month Sales

(000 units)

Feb. 19 Mar. 18 Apr. 15 May 20 Jun. 18 Jul. 22 Aug. 20

a. Plot the monthly data on a sheet of graph paper. b. Forecast September sales volume using each of the following:

(1) The naive approach. (2) A five month moving average. (3) A weighted average using .60 for August, .30 for July, and .10 for June. (4) Exponential smoothing with a smoothing constant equal to .20, assuming a a March

forecast of 19(000). (5) A linear trend equation.

c. Which method seems least appropriate? Why? ( Hint: Refer to your plot from part a. ) d. What does use of the term sales rather than demand presume?

3. A dry cleaner uses exponential smoothing to forecast equipment usage at its main plant. August usage was forecasted to be 88 percent of capacity; actual usage was 89.6 percent of capacity. A smoothing constant of .1 is used. a. Prepare a forecast for September. b. Assuming actual September usage of 92 percent, prepare a forecast for October usage.

4. An electrical contractor’s records during the last five weeks indicate the number of job requests:

Week: 1 2 3 4 5 Requests: 20 22 18 21 22

Predict the number of requests for week 6 using each of these methods: a. Naive. b. A four-period moving average. c. Exponential smoothing with �   �  .30. Use 20 for week 2 forecast.

5. A cosmetics manufacturer’s marketing department has developed a linear trend equation that can be used to predict annual sales of its popular Hand & Foot Cream.

80 15F tt � �

where

F t   �  Annual sales (000 bottles) t is in years

a. Are annual sales increasing or decreasing? By how much? b. Predict annual sales for year 6 using the equation.

6. From the following graph, determine the equation of the linear trend line for time-share sales for Glib Marketing, Inc.

ste24102_ch03_074-133.indd 125ste24102_ch03_074-133.indd 125 11/10/13 5:11 PM11/10/13 5:11 PM

Final PDF to printer

126 Chapter Three Forecasting

600

500

400

300

200

100

0

Year

S al

es (

u n

it s)

1 2 3 4 5 6 7 8 9 100

Annual Sales, Glib Sales, Inc.

7. Freight car loadings over a 12-year period at a busy port are as follows:

Week Number Week Number Week Number

1 220 7 350 13 460

2 245 8 360 14 475

3 280 9 400 15 500

4 275 10 380 16 510

5 300 11 420 17 525

6 310 12 450 18 541

a. Determine a linear trend line for expected freight car loadings. b. Use the trend equation to predict expected loadings for weeks 20 and 21. c. The manager intends to install new equipment when the volume exceeds 800 loadings per week.

Assuming the current trend continues, the loading volume will reach that level in approximately what week?

8. Air travel on Mountain Airlines for the past 18 weeks was:

Week Passengers Week Passengers

1 405 10 440 2 410 11 446 3 420 12 451 4 415 13 455 5 412 14 464 6 420 15 466 7 424 16 474 8 433 17 476 9 438 18 482

a. Explain why an averaging technique would not be appropriate for forecasting. b. Use an appropriate technique to develop a forecast for the expected number of passengers for

the next three weeks.

9. a. Obtain the linear trend equation for the following data on new checking accounts at Fair Savings Bank and use it to predict expected new checking accounts for periods 16 through 19.

Period New

Accounts Period New

Accounts Period New

Accounts

1 200 6 232 11 281

2 214 7 248 12 275

3 211 8 250 13 280

4 228 9 253 14 288

5 235 10 267 15 310

b. Use trend-adjusted smoothing with �   �  .3 and �   �  .2 to smooth the new account data in part a. What is the forecast for period 16?

ste24102_ch03_074-133.indd 126ste24102_ch03_074-133.indd 126 11/10/13 5:11 PM11/10/13 5:11 PM

Final PDF to printer

Chapter Three Forecasting 127

10. After plotting demand for four periods, an emergency room manager has concluded that a trend- adjusted exponential smoothing model is appropriate to predict future demand. The initial estimate of trend is based on the net change of 30 for the three periods from 1 to 4, for an average of � 10 units. Use �   �  .5 and �   �  .4, and TAF of 250 for period 5. Obtain forecasts for periods 6 through 10.

Period Actual Period Actual

1 210 6 265

2 224 7 272

3 229 8 285

4 240 9 294

5 255 10

11. A manager of a store that sells and installs spas wants to prepare a forecast for January, February, and March of next year. Her forecasts are a combination of trend and seasonality. She uses the fol- lowing equation to estimate the trend component of monthly demand: Ft   �  70  �  5 t, where t   �  0 in June of last year. Seasonal relatives are 1.10 for January, 1.02 for February, and .95 for March. What demands should she predict?

12. The following equation summarizes the trend portion of quarterly sales of condominiums over a long cycle. Sales also exhibit seasonal variations. Using the information given, prepare a forecast of sales for each quarter of next year (not this year), and the first quarter of the year following that.

40 6.5 2 2F t tt � � �

where

F t   �  Unit sales t   �  0 at the first quarter of last year

Quarter Relative

1 1.1 2 1.0 3 .6 4 1.3

13. Compute seasonal relatives for this data using the SA method:

14. A tourist center is open on weekends (Friday, Saturday, and Sunday). The owner-manager hopes to improve scheduling of part-time employees by determining seasonal relatives for each of these days. Data on recent traffic at the center have been tabulated and are shown in the following table:

WEEK

1 2 3 4 5 6

Friday 149 154 152 150 159 163

Saturday 250 255 260 268 273 276

Sunday 166 162 171 173 176 183

a. Develop seasonal relatives for the shop using the centered moving average method. b. Develop seasonal relatives for the shop using the SA method (see Example 8B). c. Explain why the results of the two methods correlate the way they do.

15. The manager of a fashionable restaurant open Wednesday through Saturday says that the restau- rant does about 35 percent of its business on Friday night, 30 percent on Saturday night, and 20 percent on Thursday night. What seasonal relatives would describe this situation?

16. Obtain estimates of daily relatives for the number of customers at a restaurant for the evening meal, given the following data. a. Use the centered moving average method. ( Hint: Use a seven-day moving average.) b. Use the SA method.

Quarter Year 1 Year 2 Year 3 Year 4

1 2 3 7 4 2 6 10 18 14 3 2 6 8 8 4 5 9 15 11

ste24102_ch03_074-133.indd 127ste24102_ch03_074-133.indd 127 11/10/13 5:11 PM11/10/13 5:11 PM

Final PDF to printer

128 Chapter Three Forecasting

Day Number Served Day

Number Served

1 80 15 84 2 75 16 78 3 78 17 83 4 95 18 96 5 130 19 135 6 136 20 140 7 40 21 44 8 82 22 87 9 77 23 82 10 80 24 88 11 94 25 99 12 131 26 144 13 137 27 144 14 42 28 48

17. A pharmacist has been monitoring sales of a certain over-the-counter pain reliever. Daily sales during the last 15 days were

Day: 1 2 3 4 5 6 7 8 9 Number sold: 36 38 42 44 48 49 50 49 52 Day: 10 11 12 13 14 15 Number sold: 48 52 55 54 56 57

a. Which method would you suggest using to predict future sales—a linear trend equation or trend-adjusted exponential smoothing? Why?

b. If you learn that on some days the store ran out of the specific pain reliever, would that knowl- edge cause you any concern? Explain.

c. Assume that the data refer to demand rather than sales. Using trend-adjusted smoothing with an initial forecast of 50 for day 8, an initial trend estimate of 2, and �   �   �   �  .3, develop forecasts for days 9 through 16. What is the MSE for the eight forecasts for which there are actual data?

18. New car sales for a dealer in Cook County, Illinois, for the past year are shown in the following table, along with monthly indexes (seasonal relatives), which are supplied to the dealer by the regional distributor.

Month Units Sold Index Month

Units Sold Index

Jan. 640 0.80 Jul. 765 0.90 Feb. 648 0.80 Aug. 805 1.15 Mar. 630 0.70 Sept. 840 1.20 Apr. 761 0.94 Oct. 828 1.20 May 735 0.89 Nov. 840 1.25 Jun. 850 1.00 Dec. 800 1.25

a. Plot the data. Does there seem to be a trend? b. Deseasonalize car sales. c. Plot the deseasonalized data on the same graph as the original data. Comment on the two

graphs. d. Assuming no proactive approach on the part of management, discuss (no calculations neces-

sary) how you would forecast sales for the first three months of the next year. e. What action might management consider based on your findings in part b?

19. The following table shows a tool and die company’s quarterly sales for the current year. What sales would you predict for the first quarter of next year? Quarter relatives are SR 1   �  1.10, SR 2   �  .99,  SR 3   �  .90, and SR 4   �  1.01.

Quarter 1 2 3 4 Sales 88 99 108 141.4

ste24102_ch03_074-133.indd 128ste24102_ch03_074-133.indd 128 11/10/13 5:11 PM11/10/13 5:11 PM

Final PDF to printer

Chapter Three Forecasting 129

20. An analyst must decide between two different forecasting techniques for weekly sales of roller blades: a linear trend equation and the naive approach. The linear trend equation is F t   �  124  �  2 t, and it was developed using data from periods 1 through 10. Based on data for periods 11 through 20 as shown in the table, which of these two methods has the greater accuracy if MAD and MSE are used?

t Units Sold

11 147

12 148

13 151

14 145

15 155

16 152

17 155

18 157

19 160

20 165

21. Two different forecasting techniques (F1 and F2) were used to forecast demand for cases of bot- tled water. Actual demand and the two sets of forecasts are as follows:

PREDICTED DEMAND

Period Demand F1 F2

1 68 66 66

2 75 68 68

3 70 72 70

4 74 71 72

5 69 72 74

6 72 70 76

7 80 71 78

8 78 74 80

a. Compute MAD for each set of forecasts. Given your results, which forecast appears to be more accurate? Explain.

b. Compute the MSE for each set of forecasts. Given your results, which forecast appears to be more accurate?

c. In practice, either MAD or MSE would be employed to compute forecast errors. What factors might lead a manager to choose one rather than the other?

d. Compute MAPE for each data set. Which forecast appears to be more accurate?

22. Two independent methods of forecasting based on judgment and experience have been prepared each month for the past 10 months. The forecasts and actual sales are as follows:

Month Sales Forecast 1 Forecast 2

1 770 771 769

2 789 785 787

3 794 790 792

4 780 784 798

5 768 770 774

6 772 768 770

7 760 761 759

8 775 771 775

9 786 784 788

10 790 788 788

a. Compute the MSE and MAD for each forecast. Does either forecast seem superior? Explain. b. Compute MAPE for each forecast. c. Prepare a naive forecast for periods 2 through 11 using the given sales data. Compute each of

the following; (1) MSE, (2) MAD, (3) tracking signal at month 10, and (4) 2 s control limits. How do the naive results compare with the other two forecasts?

ste24102_ch03_074-133.indd 129ste24102_ch03_074-133.indd 129 11/10/13 5:11 PM11/10/13 5:11 PM

Final PDF to printer

130 Chapter Three Forecasting

23. Long-Life Insurance has developed a linear model that it uses to determine the amount of term life insurance a family of four should have, based on the current age of the head of the household. The equation is:

850 .1y x� �

where

y   �  Insurance needed ($000)

x   �  Current age of head of household a. Plot the relationship on a graph. b. Use the equation to determine the amount of term life insurance to recommend for a family of

four if the head of the household is 30 years old.

24. Timely Transport provides local delivery service for a number of downtown and suburban busi- nesses. Delivery charges are based on distance and weight involved for each delivery: 10 cents per pound and 15 cents per mile. Also, there is a $10 handling fee per parcel. a. Develop an expression that summarizes delivery charges. b. Determine the delivery charge for transporting a 40-pound parcel 26 miles.

25. The manager of a seafood restaurant was asked to establish a pricing policy on lobster dinners. Experimenting with prices produced the following data:

Average Number Sold per Day, y Price, x

Average Number Sold per Day, y Price, x

200 $6.00 155 $8.25

190 6.50 156 8.50

188 6.75 148 8.75

180 7.00 140 9.00

170 7.25 133 9.25

162 7.50

160 8.00

a. Plot the data and a regression line on the same graph. b. Determine the correlation coefficient and interpret it.

26. The following data were collected during a study of consumer buying patterns:

Observation x y Observation x y

1 15 74 8 18 78 2 25 80 9 14 70 3 40 84 10 15 72 4 32 81 11 22 85 5 51 96 12 24 88 6 47 95 13 33 90 7 30 83

a. Plot the data. b. Obtain a linear regression line for the data. c. What percentage of the variation is explained by the regression line? d. Use the equation determined in part b to predict the expected value of y for x   �  41.

27. Lovely Lawns, Inc., intends to use sales of lawn fertilizer to predict lawn mower sales. The store man- ager estimates a probable six-week lag between fertilizer sales and mower sales. The pertinent data are:

Period

Fertilizer Sales (tons)

Number of Mowers Sold

(six-week lag) Period

Fertilizer Sales (tons)

Number of Mowers Sold

(six-week lag)

1 1.6 10 8 1.3 7 2 1.3 8 9 1.7 10 3 1.8 11 10 1.2 6 4 2.0 12 11 1.9 11 5 2.2 12 12 1.4 8 6 1.6 9 13 1.7 10 7 1.5 8 14 1.6 9

ste24102_ch03_074-133.indd 130ste24102_ch03_074-133.indd 130 11/10/13 5:11 PM11/10/13 5:11 PM

Final PDF to printer

Chapter Three Forecasting 131

a. Determine the correlation between the two variables. Does it appear that a relationship between these variables will yield good predictions? Explain.

b. Obtain a linear regression line for the data. c. Predict expected lawn mower sales for the first week in August, given fertilizer sales six weeks

earlier of 2 tons.

28. The manager of a travel agency has been using a seasonally adjusted forecast to predict demand for packaged tours. The actual and predicted values are as follows:

Period Demand Predicted

1 129 124 2 194 200 3 156 150 4 91 94 5 85 80 6 132 140 7 126 128 8 126 124 9 95 100 10 149 150 11 98 94 12 85 80 13 137 140 14 134 128

a. Compute MAD for the fifth period, then update it period by period using exponential smooth- ing with �   �  .3.

b. Compute a tracking signal for periods 5 through 14 using the initial and updated MADs. If lim- its of  4 are used, what can you conclude?

29. Refer to the data in problem 22. a. Compute a tracking signal for the 10th month for each forecast using the cumulative error for

months 1 to 10. Use action limits of  4. Is there bias present? Explain. b. Compute 2 s control limits for each forecast.

30. The classified department of a monthly magazine has used a combination of quantitative and quali- tative methods to forecast sales of advertising space. Results over a 20-month period are as follows:

Month Error Month Error

1 �8 11 1 2 �2 12 6 3 4 13 8 4 7 14 4 5 9 15 1 6 5 16 �2 7 0 17 �4 8 �3 18 �8 9 �9 19 �5 10 �4 20 �1

a. Compute a tracking signal for months 11 through 20. Compute an initial value of MAD for month 11, and then update it for each month using exponential smoothing with �   �  .1. What can you conclude? Assume limits of  4.

b. Using the first half of the data, construct a control chart with 2 s limits. What can you conclude? c. Plot the last 10 errors on the control chart. Are the errors random? What is the implication of this?

31. A textbook publishing company has compiled data on total annual sales of its business texts for the preceding nine years:

Year: 1 2 3 4 5 6 7 8 9 Sales (000): 40.2 44.5 48.0 52.3 55.8 57.1 62.4 69.0 73.7

a. Using an appropriate model, forecast textbook sales for each of the next five years. b. Prepare a control chart for the forecast errors using the original data. Use 2 s limits. c. Suppose actual sales for the next five years turn out as follows:

ste24102_ch03_074-133.indd 131ste24102_ch03_074-133.indd 131 11/10/13 5:11 PM11/10/13 5:11 PM

Final PDF to printer

132 Chapter Three Forecasting

Year: 10 11 12 13 14 Sales (000): 77.2 82.1 87.8 90.6 98.9

Is the forecast performing adequately? Explain.

32. A manager has just received an evaluation from an analyst on two potential forecasting alternatives. The analyst is indifferent between the two alternatives, saying that they should be equally effective.

Period: 1 2 3 4 5 6 7 8 9 10 Data: 37 39 37 39 45 49 47 49 51 54 Alt. 1: 36 38 40 42 46 46 46 48 52 55 Alt. 2: 36 37 38 38 41 52 47 48 52 53

a. What would cause the analyst to reach this conclusion? b. What information can you add to enhance the analysis?

33. A manager uses this equation to predict demand for landscaping services: F t   �  10  �  5 t. Over the past eight periods, demand has been as follows:

Period, t: 1 2 3 4 5 6 7 8 Demand: 15 21 23 30 32 38 42 47

Is the forecast performing adequately? Explain.

34. A manager uses a trend equation plus quarterly relatives to predict demand. Quarter relatives are SR 1   �  .90, SR 2   �  .95, SR 3   �  1.05, and SR 4   �  1.10. The trend equation is: F t   �  10  �  5 t. Over the past nine quarters, demand has been as follows:

Period, t: 1 2 3 4 5 6 7 8 9 Demand: 14 20 24 31 31 37 43 48 52

Is the forecast performing adequately? Explain.

M&L Manufacturing makes various components for printers and copi- ers. In addition to supplying these items to a major manufacturer, the company distributes these and similar items to office supply stores and computer stores as replacement parts for printers and desktop copiers. In all, the company makes about 20 different items. The two markets (the major manufacturer and the replacement market) require somewhat different handling. For example, replacement products must be pack- aged individually whereas products are shipped in bulk to the major manufacturer.

The company does not use forecasts for production planning. Instead, the operations manager decides which items to produce and the batch size, based on orders and the amounts in inventory. The products that have the fewest amounts in inventory get the highest priority. Demand is uneven, and the company has experienced being overstocked on some items and out of others. Being understocked has occasionally created tensions with the managers of retail outlets. Another problem is that prices of raw materials have been creeping up, although the operations manager thinks that this might be a temporary condition.

Because of competitive pressures and falling profits, the manager has decided to undertake a number of changes. One change is to intro- duce more formal forecasting procedures in order to improve produc- tion planning and inventory management.

With that in mind, the manager wants to begin forecasting for two products. These products are important for several reasons. First, they account for a disproportionately large share of the company’s profits. Second, the manager believes that one of these products will become increasingly important to future growth plans; and third, the other prod- uct has experienced periodic out-of-stock instances.

The manager has compiled data on product demand for the two products from order records for the previous 14 weeks. These are shown in the following table.

Week Product 1 Product 2

1 50 40

2 54 38

3 57 41

4 60 46

5 64 42

6 67 41

7 90 * 41

8 76 47

9 79 42

10 82 43

11 85 42

12 87 49

13 92 43

14 96 44

*Unusual order due to flooding of customer’s warehouse.

Questions

1. What are some of the potential benefits of a more formalized approach to forecasting?

2. Prepare a weekly forecast for the next four weeks for each prod- uct. Briefly explain why you chose the methods you used. ( Hint: For product 2, a simple approach, possibly some sort of naive/intuitive approach, would be preferable to a technical approach in view of the manager’s disdain of more technical methods.)

CASE M&L Manufacturing

ste24102_ch03_074-133.indd 132ste24102_ch03_074-133.indd 132 11/10/13 5:11 PM11/10/13 5:11 PM

Final PDF to printer

133

Highline Financial Services provides three categories of service to its clients. Managing partner Freddie Mack is getting ready to prepare financial and personnel hiring (or layoff) plans for the coming year. He is a bit perplexed by the following printout he obtained, which seems to show oscillating demand for the three categories of services over the past eight quarters:

SERVICE

Year Quarter A B C

1 1 60 95 93 2 45 85 90 3 100 92 110 4 75 65 90

Examine the demand that this company has experienced for the three categories of service it offers over the preceding two years.

Assuming nothing changes in terms of advertising or promotion, and competition doesn’t change, pre- dict demand for the services the company offers for the next four quar- ters. Note that there are not enough data to develop seasonal relatives. Nonetheless, you should be able to make reasonably good, approximate intuitive estimates of demand. What general observations can you make regarding demand? Should Freddie have any concerns? Explain.

SERVICE

Year Quarter A B C

2 1 72 85 102 2 51 75 75 3 112 85 110 4 85 50 100

CASE Highline Financial Services, Ltd.

Acar, Yavuc, and Everette S. Gardner, Jr. “Forecasting Method Selection in a Global Supply Chain.” Inter- national Journal of Forecasting 28, no. 4 (October– December 2012), 842–48.

Bonomo, Charles. “Forecasting from the Center of the Supply Chain.” Journal of Business Forecasting Methods and Systems 22, no. 1 (Spring 2003), p. 3.

Byrne, Robert F. “Forecasting Performance for North American Consumer Products.” Journal of Business Forecasting 31, no. 3 (Fall 2012), p. 12.

Hanke, John, and Dean Wichern. Business Forecasting. 9 th ed. Upper Saddle River, NJ: Pearson, 2009.

Hopp, Wallace J., and Mark I. Spearman. Factory Physics. 3 rd ed. New York: McGraw-Hill, 2008.

Wilson, J. Holton, Barry Keating, and John Galt Solu- tions. Business Forecasting with ForecastX. 6 th ed. New York: McGraw-Hill, 2009.

SELECTED BIBLIOGRAPHY AND FURTHER

READINGS

ste24102_ch03_074-133.indd 133ste24102_ch03_074-133.indd 133 11/29/13 1:04 AM11/29/13 1:04 AM

Final PDF to printer

134

C H A P T E R

4 CHAPTER OUTLINE

4.1 Introduction, 136 What Does Product and Service Design Do?  136

Key Questions, 136

Reasons for Product or Service Design or Redesign, 137

4.2 Idea Generation, 139

4.3 Legal and Ethical Considerations, 141

4.4 Human Factors, 142

4.5 Cultural Factors, 143

4.6 Global Product and Service Design, 143

4.7 Environmental Factors: Sustainability, 144 Cradle-to-Grave Assessment, 144

End-of-Life Programs, 144

The Three Rs: Reduce, Reuse, Recycle, 144

Reduce: Value Analysis, 145

Reuse: Remanufacturing, 145

Recycle, 146

4.8 Other Design Considerations 149 Strategies for Product or Service Life Stages,  149

Degree of Standardization, 151

Designing for Mass Customization, 151

Reliability, 153

Robust Design, 154

Degree of Newness, 155

Quality Function Deployment, 155

The Kano Model, 158

4.9 Phases in Product Design and Development, 159

4.10 Designing for Production, 160 Concurrent Engineering, 160

Computer-Aided Design, 160

Production Requirements, 161

Component Commonality, 162

4.11 Service Design, 162 Overview of Service Design, 163

Differences between Service Design and Product Design, 163

Phases in the Service Design Process, 164

Service Blueprinting, 164

Characteristics of Well-Designed Service Systems, 165

Challenges of Service Design, 166

Guidelines for Successful Service Design,  166

4.12 Operations Strategy, 167

Operations Tour: High Acres Landfill, 170

Chapter Supplement: Reliability, 171

Product and Service Design

After completing this chapter, you should be able to:

LO4.1 Explain the strategic importance of product and service design.

LO4.2 Describe what product and service design does.

LO4.3 Name the key questions of product and service design.

LO4.4 Identify some reasons for design or redesign.

LO4.5 List some of the main sources of design ideas.

LO4.6 Discuss the importance of legal, ethical, and sustainability considerations in product and service design.

LO4.7 Explain the purpose and goal of life cycle assessment.

LO4.8 Explain the phrase “the 3 Rs.”

LO4.9 Briefly describe the phases in product design and development.

LO4.10 Discuss several key issues in product or service design.

LO4.11 Discuss the two key issues in service design.

LO4.12 List the characteristics of well-designed service systems.

LO4.13 List some guidelines for successful service design.

LEARNING OBJECTIVES

ste24102_ch04_134-170.indd 134ste24102_ch04_134-170.indd 134 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

135

The essence of a business organization is the products and services it offers, and every aspect of the organization and its supply chain are structured around those products and services. Organizations that have well-designed products or services are more likely to realize their goals than those with poorly designed products or services. Hence, organizations have a stra- tegic interest in product and service design. Product or service design should be closely tied to an organization’s strategy. It is a major factor in cost, quality, time-to-market, customer satisfaction, and competitive advantage. Consequently, marketing, finance, operations, accounting, IT, and HR need to be involved. Demand forecasts and projected costs are important, as is the expected impact on the supply chain. It is significant to note that an important cause of operations failures can be traced to faulty design. Designs that have not been well thought out, or incorrectly implemented, or instructions for assembly or usage that are wrong or unclear, can be the cause of product and service failures, leading to lawsuits, injuries and deaths, product recalls, and damaged reputations.

The introduction of new products or services, or changes to product or service designs, can have impacts throughout the organization and the entire supply chain. Some processes may change very little, while others may have to change consider- ably in terms of what they do or how and when they do it. New processes may have to be added, and some current ones may be eliminated. New suppliers and distributors may need to be found and integrated into the system, and some current suppliers and distributors may no longer be an appropriate fit. Moreover, it is necessary to take into account projected impact on demand as well as financial, marketing, and distribution implications. Because of the potential for widespread effects, taking a “big picture” systems approach early and throughout the design or redesign process is imperative to reduce the chance of missing some implications and costs, and to understand the time it will take. Likewise, input from engineering, operations, marketing, finance, accounting, and supply chains is crucial.

In this chapter you will discover insights into the design process that apply to both product and service design.

LO4.1 Explain the strategic importance of product and service design.

ste24102_ch04_134-170.indd 135ste24102_ch04_134-170.indd 135 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

136

4.1 INTRODUCTION This section discusses what product and service designers do, the reasons for design (or rede- sign), and key questions that management must address.

What Does Product and Service Design Do? The various activities and responsibilities of product and service design include the following (functional interactions are shown in parentheses):

1. Translate customer wants and needs into product and service requirements. (marketing, operations)

2. Refine existing products and services. (marketing)

3. Develop new products and/or services. (marketing, operations)

4. Formulate quality goals. (marketing, operations)

5. Formulate cost targets. (accounting, finance, operations)

6. Construct and test prototypes. (operations, marketing, engineering)

7. Document specifications.

8. Translate product and service specifications into process specifications. (engineering, operations)

Product and service design involves or affects nearly every functional area of an organiza- tion. However, marketing and operations have major involvement.

Key Questions From a buyer’s standpoint, most purchasing decisions entail two fundamental considerations; one is cost and the other is quality or performance. From the organization’s standpoint, the key questions are:

1. Is there demand for it? What is the potential size of the market, and what is the expected demand profile (will demand be long term or short term, will it grow slowly or quickly)?

2. Can we do it? Do we have the necessary knowledge, skills, equipment, capacity, and supply chain capability? For products, this is known as manufacturability ; for services, this is known as serviceability . Also, is outsourcing some or all of the work an option?

3. What level of quality is appropriate? What do customers expect? What level of quality do competitors provide for similar items? How would it fit with our current offerings?

4. Does it make sense from an economic standpoint? What are the potential liability issues, ethical considerations, sustainability issues, costs, and profits? For nonprofits, is the cost within budget?

LO4.2 Describe what product and service design does.

LO4.3 Name the key questions of product and service design.

Manufacturability  The capability of an organization to produce an item at an acceptable profit.

Serviceability  The capability of an organization to provide a service at an acceptable cost or profit.

Some companies, such as Steelcase, Inc., have adopted “design thinking” to integrate design strategy throughout the company. The idea is to predicate design on insights into user wants and needs—not really a new concept, but one that is put forth in a way that becomes the focal point of how the company makes design decisions.

Source: Based on “Sustaining the Dream,” BusinessWeek, October 15, 2007, p. 60.

As businesses continue to reduce costs to achieve competitive advan- tage, design issues are becoming increasingly important aspects of business strategy. Because product and service design touches every part of a business organization, from operations and supply chains to finance, marketing, accounting, and information systems, design deci- sions have far-reaching implications for the organization and its suc- cess in the marketplace. Product and service innovation is becoming a key avenue in pursuing a competitive edge, and sustainability issues are being given increasing importance in business decisions.

READING Design as a Business Strategy

is to predicate design

c.,,, te

ste24102_ch04_134-170.indd 136ste24102_ch04_134-170.indd 136 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

Chapter Four Product and Service Design 137

Reasons for Product and Service Design or Redesign Product and service design has typically had strategic implications for the success and pros- perity of an organization. Furthermore, it has an impact on future activities. Consequently, decisions in this area are some of the most fundamental that managers must make.

Organizations become involved in product and service design or redesign for a variety of reasons. The main forces that initiate design or redesign are market opportunities and threats. The factors that give rise to market opportunities and threats can be one or more changes:

• Economic (e.g., low demand, excessive warranty claims, the need to reduce costs).

• Social and demographic (e.g., aging baby boomers, population shifts).

• Political, liability, or legal (e.g., government changes, safety issues, new regulations).

• Competitive (e.g., new or changed products or services, new advertising/promotions).

• Cost or availability (e.g., of raw materials, components, labor, water, energy).

• Technological (e.g., in product components, processes).

While each of these factors may seem obvious, let’s reflect a bit on technological changes, which can create a need for product or service design changes in several different ways. An obvious way is new technology that can be used directly in a product or service (e.g., a faster, smaller microprocessor that spawns a new generation of personal digital assistants or cell phones). Technology also can indirectly affect product and service design: Advances in pro- cessing technology may require altering an existing design to make it compatible with the new processing technology. Still another way that technology can impact product design is illustrated by new digital recording technology that allows television viewers to skip com- mercials when they view a recorded program. This means that advertisers (who support a television program) can’t get their message to viewers. To overcome this, some advertisers have adopted a strategy of making their products an integral part of a television program, say by having their products prominently displayed and/or mentioned by the actors as a way to call viewers’ attention to their products without the need for commercials.

The following reading suggests another potential benefit of product redesign.

LO4.4 Identify some reasons for design or redesign.

by redesigning products than by outsourcing production to other countries such as China. In many instances, the study shows, redesigning a product and manufacturing it in the United States is a better option for saving money.

To support this idea, the authors identify two principles of design best practices that, they said, many U.S. manufacturing companies overlook when making outsourcing decisions:

• First, it is possible to redesign products to reduce part count and cost. As an illustration, the study features an in-depth, quantita- tive analysis showing how the redesign of an electric drill would eliminate the cost advantage of offshore manufacturing and justify a decision not to outsource production.

• And second, it is necessary to account for all the additional costs associated with offshore manufacturing and to apply those addi- tional costs to the product. The study warns that companies may not be accounting for the full costs of outsourcing when they

Redesign, not offshoring production to countries such as China, holds the greatest promise of cost advantage for U.S. manufacturers, accord- ing to a new study that attacks longstanding assumptions about product costs that have troubled manufacturers for decades, both in the United States and worldwide.

The study, “Improved Product Design Practices Would Make U.S. Manufacturing More Cost Effective: A Case to Consider Before Out- sourcing to China,” suggests that U.S. companies should do a much better job of integrating cost analysis into product design. If rigorous cost analysis were to be instituted as a foundation for product design, U.S. manufacturers would be able to develop innovative products that are more economical to produce in the United States, assert the report’s coauthors, Nicholas P. Dewhurst and David G. Meeker.

Dewhurst is executive vice president of Boothroyd Dewhurst, a solu- tion provider specializing in software for design for manufacture and assembly (DFMA). Meeker is a DFMA consultant.

One of the more provocative conclusions of the study is that it can be more advantageous for U.S. manufacturers to lower costs

READING Product Redesign, Not Offshoring, Holds Cost Advantage for U.S. Manufacturers

many instances the

(continued)

ste24102_ch04_134-170.indd 137ste24102_ch04_134-170.indd 137 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

138 Chapter Four Product and Service Design

now rushing to outsource manufacturing still do not understand that the design of the product determines the final cost.”

Dewhurst warned that outsourcing should not be the first step in lowering product costs. “Considering the competitive nature of the global economy and the many hidden risks associated with outsourcing ventures, U.S. companies should scour product designs for efficiency before resorting to offshore production,” he said. “We hope this study encourages the U.S. manufacturing industry to take another look at design cost analysis.”

Source: “Product Redesign, Not Offshoring, Holds Cost Advantage for U.S. Man- ufacturers,” Supply & Demand Chain Executive, September 8, 2004. Copyright © 2004 Cygnus Business Media and/or its suppliers, 1233 Janesville Ave., Fort Atkinson, WI 53538 U.S.A. All rights reserved.

consider sending production overseas to countries with very low labor rates such as China. The authors identify a number of hidden costs, including shipping and logistics, that can add an estimated 24 percent to labor and material costs at the offshore location.

The study seeks to demonstrate that if companies consider the potential for design improvement along with a realistic estimate of the full costs of outsourcing, it often makes more sense to manufacture products in the United States.

“We know, from years of consulting with design engineers, that U.S. manufacturers have very little visibility into what their products should cost to make,” said Dewhurst. “Companies historically do a poor job of integrating cost analysis into early product design. Many companies

(concluded

The labels are applied automatically, quite a feat, considering their complexity, size, and the hollow handle they likely encounter during application. MacDonald admits, “Label application was a challenge. We had to modify the bottle several times to accommodate the labeling machinery available.”

Source: “Dutch Boy Brushes Up Its Paints,” Packaging Digest, October 2002. Copyright © 2002 Reed Business Information. Used with permission.

Sherwin-Williams’ Dutch Boy Group has put a revolutionary spin on wall/house painting with its new square-shaped Twist & Pour ™ paint- delivery container for the Dirt Fighter interior latex paint line. The four- piece square container could be the first major change in how house paint is packaged in decades. Lightweight but sturdy, the Twist & Pour “bucket” is packed with so many conveniences, it’s next to impossible to mess up a painting project.

Winning Best of Show in an AmeriStar packaging competition spon- sored by the Institute of Packaging Professionals, the exclusive, all- plastic paint container stands almost 7½ in. tall and holds 126 oz., a bit less than 1 gal. Rust-resistant and moisture-resistant, the plastic bucket gives users a new way to mix, brush, and store paint.

A hollow handle on one side makes it comfortable to pour and [carry]. A convenient, snap-in pour spout neatly pours paint into a tray with no dripping but can be removed if desired, to allow a wide brush to be dipped into the 5¾-in.-dia. mouth. Capping the container is a large, twist-off lid that requires no tools to open or close. Molded with two lugs for a snug-finger-tight closing, the threaded cap provides a tight seal to extend the shelf life of unused paint.

While the lid requires no tools to access, the snap-off carry bail is assembled on the container in a “locked-down position” and can be pulled up after purchase for toting or hanging on a ladder. Large, nearly 4½-in.- tall label panels allow glossy front and back labels printed and UV-coated to wrap around the can’s rounded corners, for an impressive display.

Jim MacDonald, co-designer of the Twist & Pour and a packaging engineer at Cleveland-based Sherwin-Williams, tells Packaging Digest that the space-efficient, square shape is easier to ship and for retail- ers to stack in stores. It can also be nested, courtesy of a recess in the bottom that mates with the lid’s top ring. “The new design allows for one additional shelf facing on an eight-foot rack or shelf area.”

READING Dutch Boy Brushes Up Its Paints

ste24102_ch04_134-170.indd 138ste24102_ch04_134-170.indd 138 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

Chapter Four Product and Service Design 139

4.2 IDEA GENERATION Ideas for new or redesigned products or services can come from a variety of sources, includ- ing customers, the supply chain, competitors, employees, and research. Customer input can come from surveys, focus groups, complaints, and unsolicited suggestions for improvement. Input from suppliers, distributors, and employees can be obtained from interviews, direct or indirect suggestions, and complaints.

One of the strongest motivators for new and improved products or services is competitors’ products and services. By studying a competitor’s products or services and how the competi- tor operates (pricing policies, return policies, warranties, location strategies, etc.), an organi- zation can glean many ideas. Beyond that, some companies purchase a competitor’s product and then carefully dismantle and inspect it, searching for ways to improve their own product. This is called reverse engineering . The Ford Motor Company used this tactic in develop- ing its highly successful Taurus model: It examined competitors’ automobiles, searching for best-in-class components (e.g., best hood release, best dashboard display, best door handle). Sometimes reverse engineering can enable a company to leapfrog the competition by devel- oping an even better product. Suppliers are still another source of ideas, and with increased emphasis on supply chains and supplier partnerships, suppliers are becoming an important source of ideas.

Research is another source of ideas for new or improved products or services. Research and development (R&D) refers to organized efforts that are directed toward increasing scientific knowledge and product or process innovation. Most of the advances in semiconduc- tors, medicine, communications, and space technology can be attributed to R&D efforts at colleges and universities, research foundations, government agencies, and private enterprises.

R&D efforts may involve basic research, applied research, or development.

Basic research has the objective of advancing the state of knowledge about a subject, without any near-term expectation of commercial applications.

Applied research has the objective of achieving commercial applications.

Development converts the results of applied research into useful commercial applications.

Basic research, because it does not lead to near-term commercial applications, is gener- ally underwritten by the government and large corporations. Conversely, applied research and development, because of the potential for commercial applications, appeals to a wide spectrum of business organizations.

The benefits of successful R&D can be tremendous. Some research leads to patents, with the potential of licensing and royalties. However, many discoveries are not patentable, or companies don’t wish to divulge details of their ideas so they avoid the patent route. Even so, the first organization to bring a new product or service to the market generally stands to profit from it before the others can catch up. Early products may be priced higher because a temporary monopoly exists until competitors bring their versions out.

The costs of R&D can be high. Some companies spend more than $1 million a day on R&D. Large companies in the automotive, computer, communications, and pharmaceutical industries spend even more. For example, IBM spends about $5 billion a year, Hewlett- Packard about $4 billion a year, and Toshiba about $3 billion a year. Even so, critics say that many U.S. companies spend too little on R&D, a factor often cited in the loss of competitive advantage.

It is interesting to note that some companies are now shifting from a focus primarily on products to a more balanced approach that explores both product and process R&D. Also, there is increasing recognition that technologies often go through life cycles, the same way that many products do. This can impact R&D efforts on two fronts. Sustained economic growth requires constant attention to competitive factors over a life cycle, and it also requires planning to be able to participate in the next-generation technology.

In certain instances, however, research may not be the best approach. The following reading illustrates a research success.

LO4.5 List some of the main sources of design ideas.

Reverse engineering  Disman- tling and inspecting a competi- tor’s product to discover product improvements.

Research and development (R&D)  Organized efforts to increase scientific knowledge or product innovation.

ste24102_ch04_134-170.indd 139ste24102_ch04_134-170.indd 139 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

140

Once the company settled on a cucumber, it had to work out details of how to get Hamburger Stackers into commercial production. One chal- lenge was to grow the cucumbers in fields, rather than in a greenhouse.

Randy Spence, Vlasic’s manager of manufacturing services, said the jumbo cucumbers grew quicker than anyone expected.

“Early on, we expected the bigger ones to grow slower, but that hasn’t been the case,” he said.

These days, most of the gigantic cucumbers are grown in Florida, where they are handpicked because of their size. Depending on the weather, they take about 54 days from seed to harvest.

Once harvested, they’re shipped to Vlasic’s plant in Sussex County. The plant employs about 260 workers year-round and 300 to 400 others from April to November.

Steven McNulty, director of plant operations at the nearly 30-year- old Millsboro facility, said the size of the new cucumbers meant they couldn’t be handled in the same manner as the smaller versions used to make pickle spears and sweet gherkins.

That became obvious when Vlasic tried to process its first batch of the somewhat fragile, jumbo-sized cucumbers.

Officials didn’t end up with the Hamburger Stackers they envisioned. Instead, they ended up with a batch of broken big cucumbers.

“On the first run, we broke every one,” Spence said. But it taught the company a lot about some of the retooling they’d

have to do to the plant in Millsboro. Officials at the plant began making months worth of adjustments

so one of the facility’s four production lines could handle the jumbo cucumbers.

“We’ve learned a lot,” McNulty said. “And we’re still learning.”

Michele Darnell Many were skeptical of Frank Meczkowski’s plan to develop a pickle so big that a single slice could cover a hamburger.

After all, whoever saw a pickle that big—except maybe in the Guin- ness Book of World Records?

Meczkowski and his team of food researchers at Vlasic Foods Inter- national were convinced the project—given the code name Frisbee— could fly.

For about four years, they labored to cultivate a jumbo cucumber with the taste, shape and crunch to be a perfect pickle.

Made only at the company’s plant in Millsboro, the monster-sized slices seem to have captured the pickle lover’s fancy. They’ve become one of Vlasic’s best-selling products since their introduction in super- markets. And the better-than-anticipated sales have helped to reverse a three-year decline in consumption of Vlasic pickles.

Hamburger Stackers are about 10 times bigger than traditional pickle chips and come in dill and bread-and-butter varieties.

“They said it just couldn’t be done.” Making a bigger pickle may not sound like that big of a deal. You just

grow a bigger cucumber, right? There is more to it than that. The folks at Vlasic soon learned how

tough it was to deal with gigantic cucumbers as they developed the new product and as they retooled the Delaware plant.

Meczkowski came up with the idea for the mammoth pickle slices soon after Vlasic’s introduction of its Sandwich Stackers—regular-size pickles sliced lengthwise so they can be draped on sandwiches.

Sandwich Stackers currently account for 20 percent of all Vlasic pickle sales.

Vlasic is the No. 1 seller of pickles in the United States, with a 32 percent share of the $800 million retail pickle market, beating out brands such as Claussen, Heinz, and Peter Piper’s.

To develop Hamburger Stackers, Meczkowski worked with seed researchers and others to scour the globe looking for oversized varieties of cucumbers. Most weren’t in commercial production.

Vlasic’s team grew different varieties in greenhouses, looking for one that would get big enough yet still make a good pickle.

It had to taste like a regular cucumber, stay crisp when pickled, have a small seed cavity and be straight enough so that it could be cut mechanically.

“We wanted it to really be a cucumber,” said Meczkowski, who has worked as a food researcher for 22 years and is based at Vlasic’s head- quarters in New Jersey.

He said Vlasic also had to decide just how big Hamburger Stackers should be. At one point, it asked consumers who were participating in focus groups to bring in their own homemade burgers so the company could determine the perfect size for its new pickles.

Eventually, Vlasic officials found what they were looking for—a now- patented cucumber that grows 3.25 inches in diameter, easily reaches 12 to 16 inches in length, and weighs about five pounds.

It looks like the watermelon’s skinny runt brother.

READING Vlasic on a Roll with Huge Pickle Slices

The Hamburger Stacker on the burger at left dwarfs a traditional pickle slice. Stackers are genetically designed using cucumbers that grow to over 3 inches in diameter and weigh 5 pounds.

ste24102_ch04_134-170.indd 140ste24102_ch04_134-170.indd 140 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

Chapter Four Product and Service Design 141

4.3 LEGAL AND ETHICAL CONSIDERATIONS Designers must be careful to take into account a wide array of legal and ethical considerations. Generally, they are mandatory. Moreover, if there is a potential to harm the environment, then those issues also become important. Most organizations are subject to numerous govern- ment agencies that regulate them. Among the more familiar federal agencies are the Food and Drug Administration, the Occupational Health and Safety Administration, the Environmental Protection Agency, and various state and local agencies. Bans on cyclamates, red food dye, phosphates, and asbestos have sent designers scurrying back to their drawing boards to find alternative designs that were acceptable to both government regulators and customers. Simi- larly, automobile pollution standards and safety features, such as seat belts, air bags, safety glass, and energy-absorbing bumpers and frames, have had a substantial impact on automotive design. Much attention also has been directed toward toy design to remove sharp edges, small pieces that can cause choking, and toxic materials. The government further regulates construc- tion, requiring the use of lead-free paint, safety glass in entranceways, access to public buildings for individuals with disabilities, and standards for insulation, electrical wiring, and plumbing.

Product liability can be a strong incentive for design improvements. Product liability is the responsibility of a manufacturer for any injuries or damages caused by a faulty product because of poor workmanship or design. Many business firms have faced lawsuits related to their products, including Firestone Tire & Rubber, Ford Motor Company, General Motors, tobacco companies, and toy manufacturers. Manufacturers also are faced with the implied warranties created by state laws under the Uniform Commercial Code , which says that prod- ucts carry an implication of merchantability and fitness; that is, a product must be usable for its intended purposes.

The suits and potential suits have led to increased legal and insurance costs, expensive settlements with injured parties, and costly recalls. Moreover, increasing customer awareness of product safety can adversely affect product image and subsequent demand for a product.

Thus, it is extremely important to design products that are reasonably free of hazards. When hazards do exist, it is necessary to install safety guards or other devices for reduc- ing accident potential, and to provide adequate warning notices of risks. Consumer groups,

LO4.6 Discuss the impor- tance of legal, ethical, and sustainability considerations in product and service design.

Product liability  The respon- sibility of a manufacturer for any injuries or damages caused by a faulty product.

Uniform Commercial Code   A product must be suitable for its intended purpose.

After being packed with pickle slices, the jars of Hamburger Stack- ers are filled with a combination of water, vinegar, salt, and other flavor- ings and colorings. They are capped, vacuum-sealed, and pasteurized before being labeled and packed for global distribution.

Some details of how Hamburger Stackers are made are kept secret. McNulty said that is because the company is certain its rivals would love to figure out how to make their own Hamburger Stackers.

Vlasic is the only pickle-making company with such a product on the market. “We think the competition loves the idea,” McNulty said.

Apparently, so does the pickle-eating public. About $13 million worth of Hamburger Stackers were sold in the

first five months after they were introduced. The company is optimistic that the product will continue to grow in

popularity with U.S. consumers who eat about 3.5 billion hamburgers at home annually.

Source: Rochester Democrat and Chronicle, December 13, 1999.

Making Hamburger Stackers requires a mix of automation and the human touch. The process starts when the big cucumbers arrive by truck and are rushed into a cold-storage facility to preserve their flavor.

Once cooled, the cucumbers can be loaded onto the production line and checked for bad spots and other flaws.

They’re washed by machine a couple times and sliced. Then they’re sized. Jiggling along a conveyor belt, slices that are too

small are weeded out by a worker and a machine. Those that are too big also are sorted out.

Too big? Yes, the monster-sized cucumbers can get a little too big to fit in

the jar. The cucumber slices that make the cut are mechanically stacked

into jars and then topped off by hand. Ella Mae Wilkerson, who has worked at the Vlasic plant in Millsboro

for 17 years, said it takes some fast hands to make certain that outgoing jars have enough pickles packed in.

“The bigger the jar, the harder it is,” she said as containers of sweet gherkins being jarred on another production line zipped by on a con- veyor belt.

ste24102_ch04_134-170.indd 141ste24102_ch04_134-170.indd 141 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

142 Chapter Four Product and Service Design

business firms, and various government agencies often work together to develop industrywide standards that help avoid some of the hazards.

Ethical issues often arise in the design of products and services; it is important for managers to be aware of these issues and for designers to adhere to ethical standards. Designers are often under pressure to speed up the design process and to cut costs. These pressures often require them to make trade-off decisions, many of which involve ethical considerations. One example of what can happen is “vaporware,” when a software company doesn’t issue a release of software as scheduled as it struggles with production problems or bugs in the software. The company faces the dilemma of releasing the software right away or waiting until most of the bugs have been removed—knowing that the longer it waits, the more time will be needed before it receives revenues and the greater the risk of damage to its reputation.

Organizations generally want designers to adhere to guidelines such as the following:

• Produce designs that are consistent with the goals of the organization. For instance, if the company has a goal of high quality, don’t cut corners to save cost, even in areas where it won’t be apparent to the customer.

• Give customers the value they expect.

• Make health and safety a primary concern. At risk are employees who will produce goods or deliver services, workers who will transport the products, customers who will use the products or receive the services, and the general public, which might be endan- gered by the products or services.

4.4 HUMAN FACTORS Human factor issues often arise in the design of consumer products. Safety and liability are two critical issues in many instances, and they must be carefully considered. For example, the crashworthiness of vehicles is of much interest to consumers, insurance companies, automo- bile producers, and the government.

Another issue for designers to take into account is adding new features to their products or services. Companies in certain businesses may seek a competitive edge by adding new features. Although this can have obvious benefits, it can sometimes be “too much of a good

The much anticipated Boeing 787 Dreamliner aircraft resumed flights after being grounded for more than three months for a battery defect. Aviation safety depends on well-maintained equipment and an expert flight crew who can handle emergencies as they come up.

ste24102_ch04_134-170.indd 142ste24102_ch04_134-170.indd 142 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

Chapter Four Product and Service Design 143

thing,” and be a source of customer dissatisfaction. This “creeping featurism” is particularly evident in electronic products such as handheld devices that continue to offer new features, and more complexity, even while they are shrinking in size. This may result in low consumer ratings in terms of “ease of use.”

4.5 CULTURAL FACTORS Product designers in companies that operate globally also must take into account any cultural differences of different countries or regions related to the product. This can result in different designs for different countries or regions, as illustrated by the following reading.

Argentina: McNifica. Hamburger sandwich with cheese, tomato, onion and lettuce.

Egypt: McFalafel. Fried patties of ground beans flavored with spices.

Israel: Seven of the 80 or so McDonald’s are kosher, meaning they follow strict Jewish dietary rules so there are no cheeseburgers, milk- shakes or sundaes.

United Kingdom: Mega Button Blast. Vanilla ice cream that you eat after breaking through a Cadbury chocolate lid.

Greece: Greek Mac. Pita bread sandwich with two beef patties and some yogurt sauce.

Japan: Teriyaki Burger. Chicken cutlet patty marinated in teriyaki sauce, with sweet mayonnaise and sliced lettuce on a sesame bun.

Germany: Gemuse Mac. A veggie burger with lettuce, tomatoes and special “wurzcreme” sauce.

Questions

1. What effects do cultural differences have on the design of fast food offerings in this reading?

2. What functions in the organization are impacted by the differences in product offerings among different countries?

Source: From The Washington Post, December 2, 2002 © 2002. The Washing- ton Post. All rights reserved. Used by permission and protected by the Copyright Laws of the United States. The printing, copying, redistribution or retransmission of the Material without express written permission is prohibited.

John Kelly Since the first McDonald’s opened in the United States in 1955, the fast food restaurant has spread around the world.

The company now has locations in 121 countries. In fact, of the 30,000 McDonald’s restaurants scattered around the globe, there are more in foreign countries (17,000) than in the good old United States (13,000).

The food you can order at many of these Mickey D’s is different from what you’ll find at the one down the street. Here’s a sample of some of the treats that await you should you pull up to the drive-through window in some faraway places:

India: McAloo Tikki Burger. A totally vegetarian sandwich with reg- ular bun, a crispy, breaded spicy potato and vegetable patty, eggless tomato mayonnaise, two slices of tomatoes and shredded onion.

France: Croque McDo. Cheese and ham between two thin pieces of toasted bread.

Italy: McPink. Two pork patties with a slice of yellow cheese. New Zealand: Kiwi Burger. A hamburger with a fried egg and a slice

of pickled beet. Turkey: Kofte Burger. A spicy meat patty inside a flavored bun,

enriched with a special yogurt mix and spiced tomato sauce. Philippines: McSpaghetti. Pasta in a red sauce with frankfurter bits. South Korea: Bulgogi Burger. Pork patty on a bun with lettuce and

spicy garlic bulgogi sauce. China: Hong Dou Pie. A dessert pie filled with red bean paste.

READING Do You Want Pickled Beets with That?

beans flavored with

ch

4.6 GLOBAL PRODUCT AND SERVICE DESIGN Traditionally, product design has been conducted by members of the design team who are located in one facility or a few nearby facilities. However, organizations that operate globally are discovering advantages in global product design, which uses the combined efforts of a team of designers who work in different countries and even on different conti- nents. Such virtual teams can provide a range of comparative advantages over traditional teams such as engaging the best human resources from around the world without the need to assemble them all in one place, and operating on a 24-hour basis, thereby decreasing

ste24102_ch04_134-170.indd 143ste24102_ch04_134-170.indd 143 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

144 Chapter Four Product and Service Design

the time-to-market. The use of global teams also allows for customer needs assessment to be done in more than one country with local resources, opportunities, and constraints to be  taken into account. Global product design can provide design outcomes that increase the marketability and utility of a product. The diversity of an international team may yield different points of view and ideas and information to enrich the design process. However, care must be taken in managing the diversity, because if it is mismanaged, that can lead to conflicts and miscommunications.

Advances in information technology have played a key role in the viability of global prod- uct design teams by enabling team members to maintain continual contact with each other and to instantaneously share designs and progress, and to transmit engineering changes and other necessary information.

4.7 ENVIRONMENTAL FACTORS: SUSTAINABILITY

Product and service design is a focal point in the quest for sustainability. Key aspects include cradle-to-grave assessment, end-of-life programs, reduction of costs and materials used, reuse of parts of returned products, and recycling.

Cradle-to-Grave Assessment Cradle-to-grave assessment , also known as life cycle analysis, is the assessment of the envi- ronmental impact of a product or service throughout its useful life, focusing on such factors as global warming (the amount of carbon dioxide released into the atmosphere), smog for- mation, oxygen depletion, and solid waste generation. For products, cradle-to-grave analysis takes into account impacts in every phase of a product’s life cycle, from raw material extrac- tion from the earth, or the growing and harvesting of plant materials, through fabrication of parts and assembly operations, or other processes used to create products, as well as the use or consumption of the product, and final disposal at the end of a product’s useful life. It also considers energy consumption, pollution and waste, and transportation in all phases. Although services generally involve less use of materials, cradle-to-grave assessment of ser- vices is nonetheless important, because services consume energy and involve many of the same or similar processes that products involve.

The goal of cradle-to-grave assessment is to choose products and services that have the least environmental impact while still taking into account economic considerations. The pro- cedures of cradle-to-grave assessment are part of the ISO 14000 environmental management standards, which are discussed in Chapter 9.

End-of-Life Programs End-of-life (EOL) programs deal with products that have reached the end of their useful lives. The products include both consumer products and business equipment. The purpose of these programs is to reduce the dumping of products, particularly electronic equip- ment, in landfills or third-world countries, as has been the common practice, or incinera- tion, which converts materials into hazardous air and water emissions and generates toxic ash. Although the programs are not limited to electronic equipment, that equipment poses problems because the equipment typically contains toxic materials such as lead, cadmium, chromium, and other heavy metals. IBM provides a good example of the potential of EOL programs. Over the last 15 years, it has collected about 2 billion pounds of product and product waste.

The Three Rs: Reduce, Reuse, and Recycle Designers often reflect on three particular aspects of potential cost saving and reducing envi- ronmental impact: reducing the use of materials through value analysis; refurbishing and then

Cradle-to-grave assessment   The assessment of the environ- mental impact of a product or service throughout its useful life.

LO4.7 Explain the purpose and goal of life cycle assessment.

LO4.8 Explain the phrase “the 3 Rs.”

ste24102_ch04_134-170.indd 144ste24102_ch04_134-170.indd 144 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

145

reselling returned goods that are deemed to have additional useful life, which is referred to as remanufacturing; and reclaiming parts of unusable products for recycling.

Reduce: Value Analysis Value analysis refers to an examination of the function of parts and materials in an effort to reduce the cost and/or improve the performance of a product. Typical questions that would be asked as part of the analysis include: Could a cheaper part or material be used? Is the function necessary? Can the function of two or more parts or components be performed by a single part for a lower cost? Can a part be simplified? Could product specifications be relaxed, and would this result in a lower price? Could standard parts be substituted for nonstandard parts? Table 4.1 provides a checklist of questions that can guide a value analysis.

The following reading describes how Kraft Foods is working to reduce water and energy use, CO 2 and plant waste, and packaging.

Reuse: Remanufacturing An emerging concept in manufacturing is the remanufacturing of products. Remanufacturing refers to refurbishing used products by replacing worn-out or defective components, and reselling the products. This can be done by the original manufacturer, or another company. Among the products that have remanufactured components are automobiles, printers, copiers, cameras, computers, and telephones.

There are a number of important reasons for doing this. One is that a remanufactured product can be sold for about 50 percent of the cost of a new product. Another is that the

Value analysis  Examination of the function of parts and materials in an effort to reduce cost and/or improve product performance.

Remanufacturing   Refurbishing used products by replacing worn-out or defective components.

connected to staff and customers, posting ques- tions on an employee Web site called the Water Cooler, tracking consumer sentiment on Facebook and Twitter (BBY- CEO), attending focus groups, and inviting customers to the company’s leadership meetings.

TVs account for the majority of items. This is somewhat of a mixed blessing. TVs with picture tubes can’t be resold; they have to be taken away and disassembled before the materials are melted down for reuse. Unlike plastics, which might end up in lawn furniture or other products, the innards of TVs aren’t of much value. In many states man- ufacturers are required by take-back laws to help finance recycling, and companies like Samsung and Sony share the costs of disposing of old TVs.

Even though there may not be a clear economic case for doing so, at least for TVs, the take-back program could also be beneficial by encour- aging innovative design and new business models. Manufacturers that know they will be responsible for the end of life of their products will design them so that they can be disassembled and recycled easily. Computer maker Dell, for instance, reduced the number of screws in its computers to make them easier to dismantle.

Source: Based on “Best Buy Wants Your Electronic Junk,” Fortune magazine, December 7, 2009.

Electronic junk, that is. The giant electronics retailer sees its recycling program as a way to get customers into its stores while building a green reputation. While old TVs, desktop computers, and other outmoded elec- tronics come in, out go flat-screen TVs, netbooks, and iPhones.

The company decided that being a good corporate citizen makes business sense. Best Buy’s commitment to corporate responsibility fits nicely with the company’s strategy and business model. To set itself apart from its biggest competitors, Walmart and Amazon, the company wants to do more than sell consumer electronics. It would like to help customers get better use out of technology, whether they are buying, installing, fixing, or disposing of their hardware. Since 2009, when Best Buy began offering free recycling of electronic equipment, millions of pounds of In Store Take Back (ISTB) have found their way to the com- pany’s 1,044 U.S. stores, making Best Buy America’s biggest collector of electronic junk.

Best Buy’s interest in the social and environmental impact of elec- tronic goods that had reached the end of their useful life came at the urging of its workers and customers. “Employees wanted to know what Best Buy was doing to become more environmentally sustainable.” Some customers—enough to matter—said they preferred buying from retailers that demonstrated an interest in their community. The com- pany audits the factories of its suppliers to make sure they don’t exploit workers or pollute the environment. It actually severed ties with 26 of about 200 factories in 2008. Best Buy CEO, Brian Dunn, strives to stay

READING Best Buy Wants Your Junk

ok and Twitter (BBY

s- er

ste24102_ch04_134-170.indd 145ste24102_ch04_134-170.indd 145 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

146

process requires mostly unskilled and semiskilled workers. And in the global market, Euro- pean lawmakers are increasingly requiring manufacturers to take back used products, because this means fewer products end up in landfills and there is less depletion of natural resources such as raw materials and fuel.

Designing products so that they can be more easily taken apart has given rise to yet another design consideration: Design for disassembly (DFD) .

Recycle Recycling is sometimes an important consideration for designers. Recycling means recover- ing materials for future use. This applies not only to manufactured parts but also to materials

Design for disassembly (DFD)  Design so that used prod- ucts can be easily taken apart.

Recycling  Recovering materials for future use.

• Oscar Mayer Deli Creations: Using 30 percent less paperboard than the previous design results in 1.2 million fewer pounds of packaging going to landfills.

• Kraft salad dressing: Using 19 percent less plastic per bottle trans- lates to 3 million pounds fewer annually. Additionally the new design allows more bottles to be shipped per truckload, leading to an increase in transportation efficiency of 18 percent.

The company is also working to help the environment, reduce water pollution/soil erosion, and support biodiversity. Considering these successes, Kraft’s recipe for sustainability is one that other companies should emulate.

The threat of global warming and the desire to protect the environment has many companies embracing sustainability initiatives. And they are finding that in many instances, there are cost savings in doing so. Among them is the Kraft Foods company, whose well-known brands include Cool Whip, Philadelphia Cream Cheese, DiGiorno pizza, Oscar Mayer, Oreo cookies, and Kraft cheeses and salad dressings. Kraft is the world’s second largest food company with 100,000 employees and annual revenues of $42 billion. The company is a member of the Dow Jones Sustainability Index and the Ethibel Sustainability Index.

The company has set some ambitious goals that it wants to achieve:

• Reduce plant energy usage by 25 percent. • Reduce plant energy-related carbon dioxide emissions by

25 percent. • Reduce plant water consumption by 15 percent. • Reduce plant waste by 15 percent. • Eliminate 150 million pounds of packaging material from the supply

chain.

Some of Kraft’s successes have come from redesigned packag- ing. The goal is ambitious. It will require more efficient packaging and a reduction in the amount of packaging material used. Kraft believes that the greatest opportunity to reduce the environmental impact of a package is early in the design phase. Their packaging designers world- wide critically consider the amount of packaging used, how much post- consumer material can be used, how much energy is used to create the packaging materials, how much CO 2 is generated as the materi- als are created and formed, and how well the package fits the product physically. According to Kraft’s press releases, examples and benefits of recent packaging redesigns include:

• DiGiorno and California Pizza Kitchen pizzas: Using slimmer cartons that allow shipment of two extra pizza boxes per case and 14 per- cent more pizzas per pallet. This leads to a savings of approximately 1.4 million pounds of packaging per year, and the ability to load more pizzas on each truck means there are fewer trucks on the road and less fuel consumed.

READING Kraft Foods’ Recipe for Sustainability

ng going to landfills

nt tt n

Kraft Natural Cheese new packaging zipper eliminates more than one million pounds of packaging per year.

ste24102_ch04_134-170.indd 146ste24102_ch04_134-170.indd 146 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

Chapter Four Product and Service Design 147

used during production, such as lubricants and solvents. Reclaimed metal or plastic parts may be melted down and used to make different products.

Companies recycle for a variety of reasons, including

1. Cost savings.

2. Environment concerns.

3. Environmental regulations.

An interesting note: Companies that want to do business in the European Union must show that a specified proportion of their products are recyclable.

The pressure to recycle has given rise to the term design for recycling (DFR) , referring to product design that takes into account the ability to disassemble a used product to recover the recyclable parts.

Design for recycling (DFR)   Design that facilitates the recov- ery of materials and components in used products for reuse.

1. Select an item that has a high annual dollar volume. This can be material, a purchased item, or a service.

2. Identify the function of the item.

3. Obtain answers to these kinds of questions:

a. Is the item necessary; does it have value; can it be eliminated?

b. Are there alternative sources for the item?

c. Can the item be provided internally?

d. What are the advantages of the present arrangement?

e. What are the disadvantages of the present arrangement?

f. Could another material, part, or service be used instead?

g. Can specifications be less stringent to save cost or time?

h. Can two or more parts be combined?

i. Can more/less processing be done on the item to save cost or time?

j. Do suppliers/providers have suggestions for improvements?

k. Do employees have suggestions for improvements?

l. Can packaging be improved or made less costly?

4. Analyze the answers obtained as well as answers to other questions that arise, and make recommendations.

TABLE 4.1 Overview of value analysis

“Xerox’s experience with reuse, recycling and remanufacturing has not only kept waste out of landfills, but saved the company billions of dollars as it did so,” said Patricia Calkins, Xerox vice president, Environment, Health and Safety. “If that amount of waste were loaded into garbage trucks, it would fill more than 160,000 trucks, stretching more than 1,000 miles, from Seattle to the Mexican border. We believe sustainability is an integral part of developing products, serving customers and posting profits.”

Source: Xerox Press Release, November 9, 2007.

By recycling yet one more 5-pound toner cartridge from a Xerox multi- function system, Xerox Corporation announced today it has surpassed a major sustainability milestone by diverting billions of pounds of electronic waste from landfills around the world through waste-free initiatives that create sustainability benefits for the company and its customers.

Launched in 1991, long before sustainability was on most com- panies’ radar screens, Xerox’s environmental program achieved waste avoidance in two areas: reuse and recycling in imaging supplies and product take-back and recycling and parts reuse. In addition, Xerox integrates innovative environmental priorities into manufacturing oper- ations to add to its recycling efforts.

READING Xerox Diverts 2 Billion Pounds of Waste from Landfills through Green Initiatives

andfills but saved the

ste24102_ch04_134-170.indd 147ste24102_ch04_134-170.indd 147 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

148

you shop again. (Some stores, like Maria’s Market in Recycle City, credit your grocery bill for reusing old bags because they don’t have to buy as many new ones.) If you only purchase one or two items, you might not need a bag at all.

Recycling Igloos In many parts of the country, supermarkets place recycling containers near the store to encourage their customers to recycle. (They can be any shape really, but Recycle City uses these brightly colored igloos because they’re fun.)

These igloos are used to collect bottles, cans, and plastic from Maria’s Market shoppers. Twice a week, trucks from the local Materials Recovery Facility come by to empty the igloos and take the items for recycling.

Cardboard Boxes The cardboard boxes used to ship food to Maria’s Market can be put to a variety of other uses once the food has been unpacked. The folks at the market let Recycle City residents come by and pick up cartons for storing things or moving to a new home. Any cartons that aren’t claimed by the residents are broken down and put into a pile so they can be collected, recycled, and made into other things, like new boxes, paper bags, building insulation, animal bedding, or packaging materials.

Reduced Packaging When the buyers at Maria’s Market place orders to restock the store, they try to order items with very little packaging, or that use ecological packaging (ones requiring as little energy and as few resources as possible to produce).

Maria’s buyers also try to stock products that come in refillable con- tainers. Products that don’t harm the environment and come in ecologi- cally friendly packages are called green products.

Packaging that isn’t environmentally friendly includes products that are wrapped in several layers of plastic, use plastic foam, or have indi- vidually wrapped packages inside of a larger wrapped package.

Maria’s Market is the main supermarket in Recycle City. Maria tries to stock items and provide services in her store that reduce the amount of material going into the waste stream and encourage reuse and recycling.

Maria realized that the first and best thing she should do was to reduce the amount of waste her customers had to throw away after they bought products at her market.

Maria To reduce the amount of waste and its impact on the environment, Maria began to stock items in the store that contained fewer harmful ingredients and used less packaging. To reduce packaging and wasted food, she created a section in the store where shoppers could buy food in bulk, measuring out the exact amounts they needed.

Maria also set up a program to reuse those things that could be reused, such as cardboard boxes that shoppers could use to carry their purchases and bring back to the store on their next visit. She also gave customers discounts for returning their plastic bags the next time they shopped and for bringing their own cloth sacks to carry gro- ceries home.

Finally, Maria made sure that many of the items in the store could be easily recycled. She set up well-marked collection containers to make it easy for shoppers to participate in the market’s recycling program. Maria knows that recycling keeps useful materials from going into land- fills, helping to preserve the land in and around Recycle City for other uses, like parks and schools.

Paper or Plastic? Should you ask for a paper or plastic bag at the checkout counter? There’s no easy answer. The materials needed to make either bag come from our natural resources.

• Paper comes from wood, which comes from trees, which grow in the earth’s soil.

• Plastic is made from petroleum, also known as fossil fuel. Petroleum is made by the decomposition (breaking down) of ancient plants and animals inside the earth.

The trees needed to make paper are considered renewable resources. That means more trees can be planted to take the place of trees that are cut down to make paper and other products. But, trees take many years to replace because they grow slowly. Once paper is made, it can be recycled and used to create more paper goods. Making it into new paper, however, uses water and energy.

Petroleum needed to make plastic is considered a non-renewable resource. Like aluminum, tin, and steel, petroleum is not renewable because it is the result of geological processes that take millions of years to complete. When used up, the earth’s petroleum reserves will be gone for a long, long time. While plastic bags are easy to reuse, they’re seldom recycled, and lots and lots of them get dumped into landfills.

The best solution is to use a cloth bag or knapsack for grocery shop- ping, or to bring your old plastic or paper bag back to the store when

READING Recycle City: Maria’s Market

new ones ) If you only

et tt g

(continued)

ste24102_ch04_134-170.indd 148ste24102_ch04_134-170.indd 148 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

Chapter Four Product and Service Design 149

4.8 OTHER DESIGN CONSIDERATIONS Aside from legal, ethical, environmental, and human considerations designers must also take into account product or service life cycles, how much standardization to incorporate, product or service reliability, and the range of operating conditions under which a product or service must function. These topics are discussed in this section. We begin with life cycles.

Strategies for Product or Service Life Stages Most, but not all, products and services go through a series of stages over their useful life, sometimes referred to as their life cycle, as shown in Figure 4.1 . Demand typically varies by phase. Different phases call for different strategies. In every phase, forecasts of demand and cash flow are key inputs for strategy.

When a product or service is introduced, it may be treated as a curiosity item. Many poten- tial buyers may suspect that all the bugs haven’t been worked out and that the price may drop after the introductory period. Strategically, companies must carefully weigh the trade-offs in getting all the bugs out versus getting a leap on the competition, as well as getting to the market at an advantageous time. For example, introducing new high-tech products or features during peak back-to-school buying periods or holiday buying periods can be highly desirable.

LO4.9 Briefly describe the phases in product design and development.

FIGURE 4.1 Products or services often go through stages over time

Time 0

D em

an d

Intro du

cti on

G ro

w th

Mat urity Decline

to reduce food waste. For larger needs, they can buy bulk quantities, which usually use less packaging material and cost less.

When purchasing fresh foods or buying in bulk, shoppers can put their purchases into refillable containers they bring to the store or into the recyclable or reusable bags Maria provides.

Paper Towels and Other Paper Items Many paper products on the shelves today have already been recycled. Buying recycled products saves valuable natural resources and helps to create a market for those materials. When manufacturers know that shoppers want recyclable goods, they will make more of them.

In Maria’s Market, the popularity of paper towels and toilet paper made from recycled materials ensures that fewer new trees have to be cut down to produce new products.

Source: Excerpted from http://www.eps.gov/recyclecity/print/supermarket.htm .

Maria’s buyers let the manufacturers who make products for the gro- cery shelves know that they and their Recycle City customers would rather buy products wrapped in environmentally friendly packages than ones that aren’t. Using this kind of packaging is good for the manufacturer’s business.

Bulk and Fresh Foods Packaging materials make up more than 30 percent of all consumer waste. Maria’s Market offers shoppers many fresh foods and bulk foods to help reduce the amount of waste from too much packaging.

Fresh foods, such as bananas, oranges, and nuts, come in their own natural packaging and are excellent sources of nutrition.

Bulk items and food purchased in bulk quantities allow Maria’s shoppers to decide exactly how much they want to keep on hand. For small needs, folks measure out the exact quantity they want, helping

(concluded

ste24102_ch04_134-170.indd 149ste24102_ch04_134-170.indd 149 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

150 Chapter Four Product and Service Design

It is important to have a reasonable forecast of initial demand so an adequate supply of prod- uct or an adequate service capacity is in place.

Over time, design improvements and increasing demand yield higher reliability and lower costs, leading the growth in demand. In the growth phase, it is important to obtain accurate projections of the demand growth rate and how long that will persist, and then to ensure that capacity increases coincide with increasing demand.

In the next phase, the product or service reaches maturity, and demand levels off. Few, if any, design changes are needed. Generally, costs are low and productivity is high. New uses for products or services can extend their life and increase the market size. Examples include baking soda, duct tape, and vinegar. The maker of Legos has found a way to grow its market as described in the following reading.

In the decline phase, decisions must be made on whether to discontinue a product or ser- vice and replace it with new ones or abandon the market, or to attempt to find new uses or new users for the existing product or service. For example, duct tape and baking soda are two products that have been employed well beyond their original uses of taping heating and cooling ducts and cooking. The advantages of keeping existing products or services can be tremendous. The same workers can produce the product or provide the service using much of the same equipment, the same supply chain, and perhaps the same distribution channels. Con- sequently, costs tend to be very low, and additional resource needs and training needs are low.

Some products do not exhibit life cycles: wooden pencils; paper clips; nails; knives, forks, and spoons; drinking glasses; and similar items. However, most new products do.

Some service life cycles are related to the life cycles of products. For example, as older prod- ucts are phased out, services such as installation and repair of the older products also phase out.

Wide variations exist in the amount of time a particular product or service takes to pass through a given phase of its life cycle: some pass through various stages in a relatively short period; others take considerably longer. Often it is a matter of the basic need for the item and the rate of technological change. Some toys, novelty items, and style items have a life cycle of less than one year, whereas other, more useful items, such as clothes washers and dryers, may last for many years before yielding to technological change.

International Design Excellence Award Winners: The Technogym Recline Personal is an recumbent bike that integrates ergonomic design, cardiovascular exercise, and entertainment, making it suitable for the home or office. Designed by Dimitriy Sergeev from Bauman Moscow State Technical University, the CookPit is a complex kitchen cooker system that was developed for small kitchens, eliminating the need for bulky appliances. The various saucepans can be nested as an effective way to save space. It can be used as an oven, steamer, slow cooker, and deep fryer.

ste24102_ch04_134-170.indd 150ste24102_ch04_134-170.indd 150 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

151

Degree of Standardization An important issue that often arises in both product/service design and process design is the degree of standardization. Standardization refers to the extent to which there is absence of vari- ety in a product, service, or process. Standardized products are made in large quantities of identi- cal items; calculators, computers, and 2 percent milk are examples. Standardized service implies that every customer or item processed receives essentially the same service. An automatic car wash is a good example; each car, regardless of how clean or dirty it is, receives the same ser- vice. Standardized processes deliver standardized service or produce standardized goods.

Standardization carries a number of important benefits as well as certain disadvantages. Standardized products are immediately available to customers. Standardized products mean interchangeable parts, which greatly lower the cost of production while increasing productiv- ity and making replacement or repair relatively easy compared with that of customized parts. Design costs are generally lower. For example, automobile producers standardize key com- ponents of automobiles across product lines; components such as brakes, electrical systems, and other “under-the-skin” parts would be the same for all car models. By reducing variety, companies save time and money while increasing quality and reliability of their products.

Another benefit of standardization is reduced time and cost to train employees and reduced time to design jobs. Similarly, scheduling of work, inventory handling, and purchasing and accounting activities become much more routine, and quality is more consistent.

Lack of standardization can at times lead to serious difficulties and competitive struggles. For example, the use by U.S. manufacturers of the English system of measurement, while most of the rest of the world’s manufacturers use the metric system, has led to problems in selling U.S. goods in foreign countries and in buying foreign machines for use in the United States. This may make it more difficult for U.S. firms to compete in the European Union.

Standardization also has disadvantages. A major one relates to the reduction in variety. This can limit the range of customers to whom a product or service appeals. And that creates a risk that a competitor will introduce a better product or greater variety and realize a competi- tive advantage. Another disadvantage is that a manufacturer may freeze (standardize) a design prematurely and, once the design is frozen, find compelling reasons to resist modification.

Obviously, designers must consider important issues related to standardization when mak- ing choices. The major advantages and disadvantages of standardization are summarized in Table 4.2 .

Designing for Mass Customization Companies like standardization because it enables them to produce high volumes of relatively low-cost products, albeit products with little variety. Customers, on the other hand, typically prefer more variety, although they like the low cost. The question for producers is how to resolve these issues without (1) losing the benefits of standardization and (2) incurring a host of problems that are often linked to variety. These include increasing the resources needed to

Standardization  Extent to which a product, service, or pro- cess lacks variety.

LO4.10 Discuss several key issues in product or service design.

LO4.10 Discuss several key issues in product or service design.

Question: Can you think of other companies that have used new colors to extend or grow the market for their products?

Source. “Lego Shrugs Off Toy-Market Blues,” The Wall Street Journal, February 21, 2013.

Lego A/S overcame the recent doldrums in the toy market as well as new competition in the building-block segment to continue its market success, increasing revenues and achieving a close tie for the No. 2 slot in the global toy business.

“The Danish toy maker enjoyed sustained success for its popular Lego City and Lego Star Wars sets. Its new Lego Friends theme, tar- geting girls, sold twice as well as initial expectations and helped triple sales to girls.”

READING Lego A/S in the Pink

new colors to extendd l d

ste24102_ch04_134-170.indd 151ste24102_ch04_134-170.indd 151 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

152 Chapter Four Product and Service Design

achieve design variety; increasing variety in the production process, which would add to the skills necessary to produce products, causing a decrease in productivity; creating an addi- tional inventory burden during and after production, by having to carry replacement parts for the increased variety of parts; and adding to the difficulty of diagnosing and repairing product failures. The answer, at least for some companies, is mass customization , a strategy of pro- ducing standardized goods or services, but incorporating some degree of customization in the final product or service. Several tactics make this possible. One is delayed differentiation, and another is modular design.

Delayed differentiation is a postponement tactic: the process of producing, but not quite completing, a product or service, postponing completion until customer preferences or specifications are known. There are a number of variations of this. In the case of goods, almost-finished units might be held in inventory until customer orders are received, at which time customized features are incorporated, according to customer requests. For example, furniture makers can produce dining room sets, but not apply stain, allowing customers a choice of stains. Once the choice is made, the stain can be applied in a relatively short time, thus eliminating a long wait for customers, giving the seller a competitive advantage. Similarly, various e-mail or Internet services can be delivered to customers as standardized packages, which can then be modified according to the customer’s preferences. Hewlett- Packard printers that are made in the United States but intended for foreign markets are mostly completed in domestic assembly plants and then finalized closer to the country of use. The result of delayed differentiation is a product or service with customized features that can be quickly produced, appealing to the customers’ desire for variety and speed of delivery, and yet one that for the most part is standardized, enabling the producer to realize the benefits of standardized production. This technique is not new. Manufacturers of men’s clothing, for example, produce suits with pants that have legs that are unfinished, allowing customers to tailor choices as to the exact length and whether to have cuffs or no cuffs. What is new is the extent to which business organizations are finding ways to incorporate this concept into a broad range of products and services.

Modular design is a form of standardization. Modules represent groupings of component parts into subassemblies, usually to the point where the individual parts lose their separate identity. One familiar example of modular design is computers, which have modular parts that can be replaced if they become defective. By arranging modules in different configu- rations, different computer capabilities can be obtained. For mass customization, modular design enables producers to quickly assemble products with modules to achieve a custom- ized configuration for an individual customer, avoiding the long customer wait that would occur if individual parts had to be assembled. Dell Computers has successfully used this con- cept to become a dominant force in the PC industry by offering consumers the opportunity to configure modules according to their own specifications. Many other computer manufactur- ers now use a similar approach. Modular design also is found in the construction industry. One firm in Rochester, New York, makes prefabricated motel rooms complete with wiring, plumbing, and even room decorations in its factory and then moves the complete rooms by rail to the construction site, where they are integrated into the structure.

One advantage of modular design of equipment compared with nonmodular design is that failures are often easier to diagnose and remedy because there are fewer pieces to investigate.

Mass customization   A strategy of producing basi- cally standardized goods, but incorporating some degree of customization.

Delayed differentiation   The process of producing, but not quite completing, a product or service until customer prefer- ences are known.

Modular design  A form of standardization in which component parts are grouped into modules that are easily replaced or interchanged.

Advantages 1. Fewer parts to deal with in inventory and in manufacturing. 2. Reduced training costs and time. 3. More routine purchasing, handling, and inspection procedures. 4. Orders fillable from inventory. 5. Opportunities for long production runs and automation. 6. Need for fewer parts justifies increased expenditures on perfecting designs

and improving quality control procedures. Disadvantages 1. Designs may be frozen with too many imperfections remaining.

2. High cost of design changes increases resistance to improvements. 3. Decreased variety results in less consumer appeal.

TABLE 4.2 Advantages and disadvantages of standardization

ste24102_ch04_134-170.indd 152ste24102_ch04_134-170.indd 152 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

Chapter Four Product and Service Design 153

Similar advantages are found in ease of repair and replace- ment; the faulty module is conveniently removed and replaced with a good one. The manufacture and assembly of modules generally involve simplifications: Fewer parts are involved, so purchasing and inventory control become more routine, fabrication and assembly operations become more standardized, and training costs often are relatively low.

The main disadvantages of modular design stem from the decrease in variety: The number of possible configura- tions of modules is much less than the number of possible configurations based on individual components. Another disadvantage that is sometimes encountered is the inability to disassemble a module in order to replace a faulty part; the entire module must be scrapped—usually at a higher cost.

Reliability Reliability is a measure of the ability of a product, a part, a service, or an entire system to perform its intended func- tion under a prescribed set of conditions. The importance of reliability is underscored by its use by prospective buy- ers in comparing alternatives and by sellers as one deter- minant of price. Reliability also can have an impact on repeat sales, reflect on the product’s image, and, if it is too low, create legal implications. Reliability is also a consideration for sustainability; the higher the reliability of a product, the fewer the resources that will be needed to maintain it, and the less frequently it will involve the three Rs.

The term failure is used to describe a situation in which an item does not perform as intended. This includes not only instances in which the item does not function at all, but also instances in which the item’s performance is substandard or it functions in a way not intended. For example, a smoke alarm might fail to respond to the presence of smoke (not operate at all), it might sound an alarm that is too faint to provide an adequate warning (substandard perfor- mance), or it might sound an alarm even though no smoke is present (unintended response).

Reliabilities are always specified with respect to certain conditions, called normal operating conditions . These can include load, temperature, and humidity ranges as well as operating procedures and maintenance schedules. Failure of users to heed these conditions often results in premature failure of parts or complete systems. For example, using a pas- senger car to tow heavy loads will cause excess wear and tear on the drive train; driving over potholes or curbs often results in untimely tire failure; and using a calculator to drive nails might have a marked impact on its usefulness for performing mathematical operations.

Improving Reliability. Reliability can be improved in a number of ways, some of which are listed in Table 4.3 .

Because overall system reliability is a function of the reliability of individual components, improvements in their reliability can increase system reliability. Unfortunately, inadequate production or assembly procedures can negate even the best of designs, and this is often a source of failures. System reliability can be increased by the use of backup components. Fail- ures in actual use often can be reduced by upgrading user education and refining maintenance recommendations or procedures. Finally, it may be possible to increase the overall reliability of the system by simplifying the system (thereby reducing the number of components that could cause the system to fail) or altering component relationships (e.g., increasing the reli- ability of interfaces).

A fundamental question concerning improving reliability is: How much reliability is needed? Obviously, the reliability needed for a household light bulb isn’t in the same category as the reliability needed for an airplane. So the answer to the question depends on the poten- tial benefits of improvements and on the cost of those improvements. Generally speaking, reliability improvements become increasingly costly. Thus, although benefits initially may increase at a much faster rate than costs, the opposite eventually becomes true. The optimal

LO4.10 Discuss several key issues in product or service design.

Reliability  The ability of a product, part, or system to per- form its intended function under a prescribed set of conditions.

Failure  Situation in which a product, part, or system does not perform as intended.

Normal operating conditions   The set of conditions under which an item’s reliability is specified.

Employees on the production line at the new Dell Global Operation Facility in China. With the capacity to produce up to seven million units a year, the site will manufacture electronics for the Chinese market as well as markets in Europe and the United States.

ste24102_ch04_134-170.indd 153ste24102_ch04_134-170.indd 153 16/10/13 11:48 PM16/10/13 11:48 PM

Final PDF to printer

154 Chapter Four Product and Service Design

level of reliability is the point where the incremental benefit received equals the incremental cost of obtaining it. In the short term, this trade-off is made in the context of relatively fixed parameters (e.g., costs). However, in the longer term, efforts to improve reliability and reduce costs can lead to higher optimal levels of reliability.

Robust Design Some products or services will function as designed only within a narrow range of conditions, while others will perform as designed over a much broader range of conditions. The latter have robust design . Consider a pair of fine leather boots—obviously not made for trekking through mud or snow. Now consider a pair of heavy rubber boots—just the thing for mud or snow. The rubber boots have a design that is more robust than that of the fine leather boots.

The more robust a product or service, the less likely it will fail due to a change in the envi- ronment in which it is used or in which it is performed. Hence, the more designers can build robustness into the product or service, the better it should hold up, resulting in a higher level of customer satisfaction.

A similar argument can be made for robust design as it pertains to the production process. Environmental factors can have a negative effect on the quality of a product or service. The more resistant a design is to those influences, the less likely is a negative effect. For exam- ple, many products go through a heating process: food products, ceramics, steel, petroleum products, and pharmaceutical products. Furnaces often do not heat uniformly; heat may vary either by position in an oven or over an extended period of production. One approach to this problem might be to develop a superior oven; another might be to design a system that moves the product during heating to achieve uniformity. A robust-design approach would develop a product that is unaffected by minor variations in temperature during processing.

Taguchi’s Approach. Japanese engineer Genichi Taguchi’s approach is based on the concept of robust design. His premise is that it is often easier to design a product that is insensitive to envi- ronmental factors, either in manufacturing or in use, than to control the environmental factors.

The central feature of Taguchi’s approach—and the feature used most often by U.S. companies—is parameter design. This involves determining the specification settings for both the product and the process that will result in robust design in terms of manufacturing variations, product deterioration, and conditions during use.

The Taguchi approach modifies the conventional statistical methods of experimental design. Consider this example. Suppose a company will use 12 chemicals in a new product it intends to produce. There are two suppliers for these chemicals, but the chemical concentrations vary slightly between the two suppliers. Classical design of experiments would require 2 12   �  4,096 test runs to determine which combination of chemicals would be optimum. Taguchi’s approach would involve only testing a portion of the possible combinations. Relying on experts to iden- tify the variables that would be most likely to affect important performance, the number of combinations would be dramatically reduced, perhaps to, say, 32. Identifying the best com- bination in the smaller sample might be a near-optimal combination instead of the optimal combination. The value of this approach is its ability to achieve major advances in product or process design fairly quickly, using a relatively small number of experiments.

Critics charge that Taguchi’s methods are inefficient and incorrect, and often lead to non- optimal solutions. Nonetheless, his methods are widely used and have been credited with helping to achieve major improvements in U.S. products and manufacturing processes.

Robust design  Design that results in products or services that can function over a broad range of conditions.

LO4.10 Discuss several key issues in product or service design.

1. Improve component design. 2. Improve production and/or assembly techniques. 3. Improve testing. 4. Use backups. 5. Improve preventive maintenance procedures. 6. Improve user education. 7. Improve system design.

TABLE 4.3 Potential ways to improve reliability

ste24102_ch04_134-170.indd 154ste24102_ch04_134-170.indd 154 16/10/13 11:49 PM16/10/13 11:49 PM

Final PDF to printer

Chapter Four Product and Service Design 155

Degree of Newness Product or service design change can range from the modification of an existing product or service to an entirely new product or service:

1. Modification of an existing product or service.

2. Expansion of an existing product line or service offering.

3. Clone of a competitor’s product or service.

4. New product or service.

The degree of change affects the newness to the organization and the newness to the mar- ket. For the organization, a low level of newness can mean a fairly quick and easy transition to producing the new product, while a high level of newness would likely mean a slower and more difficult, and therefore more costly, transition. For the market, a low level of new- ness would mean little difficulty with market acceptance, but possibly low profit potential. Even in instances of low profit potential, organizations might use this strategy to maintain market share. A high level of newness, on the other hand, might mean more difficulty with acceptance, or it might mean a rapid gain in market share with a high potential for profits. Unfortunately, there is no way around these issues. It is important to carefully assess the risks and potential benefits of any design change, taking into account clearly identified cus- tomer wants.

Quality Function Deployment Obtaining input from customers is essential to assure that they will want what is offered for sale. Although obtaining input can be informal through discussions with customers, there is a formal way to document customer wants. Quality function deployment (QFD) is a struc- tured approach for integrating the “voice of the customer” into both the product and service development process. The purpose is to ensure that customer requirements are factored into every aspect of the process. Listening to and understanding the customer is the central feature of QFD. Requirements often take the form of a general statement such as, “It should be easy to adjust the cutting height of the lawn mower.” Once the requirements are known, they must be translated into technical terms related to the product or service. For example, a statement about changing the height of the lawn mower may relate to the mechanism used to accomplish that, its position, instructions for use, tightness of the spring that controls the mechanism, or materials needed. For manufacturing purposes, these must be related to the materials, dimen- sions, and equipment used for processing.

The structure of QFD is based on a set of matrices. The main matrix relates customer requirements (what) and their corresponding technical requirements (how). This matrix is illustrated in Figure 4.2 . The matrix provides a structure for data collection.

LO4.10 Discuss several key issues in product or service design.

Quality function deployment (QFD)  An approach that integrates the “voice of the cus- tomer” into both product and service development.

LO4.10 Discuss several key issues in product or service design.

FIGURE 4.2 An example of the house of quality: the main QFD matrix

Source: Ernst and Young Consulting Group, Total Quality (Homewood, IL: Dow-Jones Irwin, 1991), p. 121. Reprinted by permission.

Technical requirements

Importance to customer

Customer requirements

Relationship matrix

ste24102_ch04_134-170.indd 155ste24102_ch04_134-170.indd 155 16/10/13 11:49 PM16/10/13 11:49 PM

Final PDF to printer

156 Chapter Four Product and Service Design

Additional features are usually added to the basic matrix to broaden the scope of analysis. Typical additional features include importance weightings and competitive evaluations. A correlational matrix is usually constructed for technical requirements; this can reveal con- flicting technical requirements. With these additional features, the set of matrices has the form illustrated in Figure 4.3 . It is often referred to as the house of quality because of its houselike appearance.

An analysis using this format is shown in Figure  4.4 . The data relate to a commercial printer (customer) and the company that supplies the paper. At first glance, the display appears complex. It contains a considerable amount of information for product and process planning. Therefore, let’s break it up into separate parts and consider them one at a time. To start, a key part is the list of customer requirements on the left side of the figure. Next, note the tech- nical requirements, listed vertically near the top. The key relationships and their degree of importance are shown in the center of the figure. The circle with a dot inside indicates the strongest positive relationship; that is, it denotes the most important technical requirements for satisfying customer requirements. Now look at the “importance to customer” numbers that are shown next to each customer requirement (3 is the most important). Designers will take into account the importance values and the strength of correlation in determining where to focus the greatest effort.

Next, consider the correlation matrix at the top of the “house.” Of special interest is the strong negative correlation between “paper thickness” and “roll roundness.” Designers will have to find some way to overcome that or make a trade-off decision.

On the right side of the figure is a competitive evaluation comparing the supplier’s per- formance on the customer requirements with each of the two key competitors (A and B). For example, the supplier (X) is worst on the first customer requirement and best on the third customer requirement. The line connects the X performances. Ideally, design will cause all of the Xs to be in the highest positions.

Across the bottom of Figure  4.4 are importance weightings, target values, and techni- cal evaluations. The technical evaluations can be interpreted in a manner similar to that of the competitive evaluations (note the line connecting the Xs). The target values typically contain technical specifications, which we will not discuss. The importance weightings are the sums of values assigned to the relationships (see the lower right-hand key for relation- ship weights). The 3 in the first column is the product of the importance to the customer, 3, and the small (Δ) weight, 1. The importance weightings and target evaluations help design- ers focus on desired results. In this example, the first technical requirement has the lowest importance weighting, while the next four technical requirements all have relatively high importance weightings.

The house of quality approach involves a sequence of “houses,” beginning with design characteristics, which leads to specific components, then production processes, and finally,

FIGURE 4.3 The house of quality

Customer requirements

Relationship matrix

Competitive assessment

Specifications or

target values

Design requirements

Correlation matrix

ste24102_ch04_134-170.indd 156ste24102_ch04_134-170.indd 156 16/10/13 11:49 PM16/10/13 11:49 PM

Final PDF to printer

Chapter Four Product and Service Design 157

FIGURE 4.4 An example of the house of quality

Technical requirements

Importance to

customer

Customer requirements

Paper will not tear

Consistent finish

No ink bleed

Prints cleanly

3

1

2

3

P ap

er w

id th

P ap

er t

h ic

kn es

s

R o

ll ro

u n

d n

es s

C o

at in

g t

h ic

kn es

s

T en

si le

s tr

en g

th

P ap

er c

o lo

r

Competitive evaluation

X = Us A = Competitor A B = Competitor B

X A B

XA B

XAB

X AB

1 2 3 4 5 (5 is best)

Importance weighting 3 27 36 36 27 9

w m

m

t m

m

C m

ic ro

n s

5 lb

s.

1 m

m t

o ta

l r u

n o

u t

w it

h in

ap p

ro ve

d p

an el

Target values

5

4

3

2

1

Technical evaluation

X A

B

X A

B X

A B

X A

B X

A B X

A B

Strong positive

Positive

Negative

Strong negative

Correlations

Strong = 9

Medium = 3

Small = 1

Relationships

FIGURE 4.5 The house of quality sequence

House 1 House 2 House 3 House 4

Design characteristics

C u

st o

m er

re q

u ir

em en

ts

D es

ig n

ch ar

ac te

ri st

ic s

Specific components

Production processes

S p

ec if

ic co

m p

o n

en ts

P ro

d u

ct io

n p

ro ce

ss es

Quality plan

a quality plan. The sequence is illustrated in Figure 4.5 . Although the details of each house are beyond the scope of this text, Figure 4.5 provides a conceptual understanding of the progression involved.

ste24102_ch04_134-170.indd 157ste24102_ch04_134-170.indd 157 16/10/13 11:49 PM16/10/13 11:49 PM

Final PDF to printer

158 Chapter Four Product and Service Design

The Kano Model The Kano model is a theory of product and service design developed by Dr. Noriaki Kano, a Japanese professor, who offered a perspective on customer perceptions of quality different from the traditional view that “more is better.” Instead, he proposed different categories of quality and posited that understanding them would better position designers to assess and address quality needs. His model provides insights into the attributes that are perceived to be important to cus- tomers. The model employs three definitions of quality: basic, performance, and excitement.

Basic quality refers to customer requirements that have only a limited effect on customer satisfaction if present, but lead to dissatisfaction if not present. For example, putting a very short cord on an electrical appliance will likely result in customer dissatisfaction, but beyond a certain length (e.g., 4 feet), adding more cord will not lead to increased levels of customer satisfaction. Performance quality refers to customer requirements that generate satisfaction or dissatisfaction in proportion to their level of functionality and appeal. For example, increasing the tread life of a tire or the amount of time house paint will last will add to customer satisfac- tion. Excitement quality refers to a feature or attribute that was unexpected by the customer and causes excitement (the “wow” factor), such as a voucher for dinner for two at the hotel restaurant when checking in. Figure 4.6A portrays how the three definitions of quality influ- ence customer satisfaction or dissatisfaction relative to the degree of implementation. Note that features that are perceived by customers as basic quality result in dissatisfaction if they are missing or at low levels, but do not result in customer satisfaction if they are present, even at high levels. Performance factors can result in satisfaction or dissatisfaction, depending on the degree to which they are present. Excitement factors, because they are unexpected, do not result in dissatisfaction when they are absent or at low levels, but have the potential for dispro- portionate levels of satisfaction if they are present.

Over time, features that excited become performance features, and performance features soon become basic quality features, as illustrated in Figure 4.6B . The rates at which various design elements are migrating is an important input from marketing that will enable design- ers to continue to satisfy and delight customers and not waste efforts on improving what have become basic quality features.

The lesson of the Kano model is that design elements that fall into each aspect of quality must first be determined. Once basic needs have been met, additional efforts in those areas should not be pursued. For performance features, cost–benefit analysis comes into play, and these features should be included as long as the benefit exceeds the cost. Excitement features pose somewhat of a challenge. Customers are not likely to indicate excitement factors in surveys because they don’t know that they want them. However, small increases in such factors produce dispropor- tional increases in customer satisfaction and generally increase brand loyalty, so it is important for companies to strive to identify and include these features when economically feasible.

The Kano model can be used in conjunction with QFD as well as in six sigma projects (see Chapter 9 for a discussion of six sigma).

LO4.10 Discuss several key issues in product or service design.

FIGURE 4.6A The Kano model Excitement

quality

Satisfied

Dissatisfied

Low functionality and appeal

High functionality and appeal

Performance quality

Basic quality

ste24102_ch04_134-170.indd 158ste24102_ch04_134-170.indd 158 16/10/13 11:49 PM16/10/13 11:49 PM

Final PDF to printer

Chapter Four Product and Service Design 159

4.9 PHASES IN PRODUCT DESIGN AND DEVELOPMENT

Product design and development generally proceeds in a series of phases (see Table 4.4 ):

Feasibility analysis. Feasibility analysis entails market analysis (demand), economic analysis (development cost and production cost, profit potential), and technical analysis (capacity requirements and availability, and the skills needed). Also, it is necessary to answer the question, Does it fit with the mission? It requires collaboration among mar- keting, finance, accounting, engineering, and operations.

Product specifications. This involves detailed descriptions of what is needed to meet (or exceed) customer wants, and requires collaboration between legal, marketing, and operations.

Process specifications. Once product specifications have been set, attention turns to specifications for the process that will be needed to produce the product. Alternatives must be weighed in terms of cost, availability of resources, profit potential, and quality. This involves collaboration between accounting and operations.

Prototype development. With product and process specifications complete, one (or a few) units are made to see if there are any problems with the product or process specifications.

Design review. At this stage, any necessary changes are made or the project is aban- doned. Marketing, finance, engineering, design, and operations collaborate to determine whether to proceed or abandon.

Market test. A market test is used to determine the extent of consumer acceptance. If unsuccessful, the product returns to the design review phase. This phase is handled by marketing.

Product introduction. The new product is promoted. This phase is handled by marketing.

Follow-up evaluation. Based on user feedback, changes may be made or forecasts refined. This phase is handled by marketing.

FIGURE 4.6B As time passes, excitement factors become performance factors, and performance factors become basic factors

Excitement quality

Satisfied

Tim e

Dissatisfied

Low functionality and appeal

High functionality and appeal

Performance quality

Basic quality

TABLE 4.4 Phases in the product development process

1. Feasibility analysis 5. Design review

2. Product specifications 6. Market test

3. Process specifications 7. Product introduction

4. Prototype development 8. Follow-up evaluation

ste24102_ch04_134-170.indd 159ste24102_ch04_134-170.indd 159 16/10/13 11:49 PM16/10/13 11:49 PM

Final PDF to printer

160 Chapter Four Product and Service Design

4.10 DESIGNING FOR PRODUCTION In this section, you will learn about design techniques that have greater applicability for the design of products than the design of services. Even so, you will see that they do have some relevance for service design. The topics include concurrent engineering, computer- assisted design, designing for assembly and disassembly, and the use of components for similar products.

Concurrent Engineering To achieve a smoother transition from product design to production, and to decrease product development time, many companies are using simultaneous development, or concurrent engi- neering. In its narrowest sense, concurrent engineering means bringing design and manu- facturing engineering people together early in the design phase to simultaneously develop the product and the processes for creating the product. More recently, this concept has been enlarged to include manufacturing personnel (e.g., materials specialists) and marketing and purchasing personnel in loosely integrated, cross-functional teams. In addition, the views of suppliers and customers are frequently sought. The purpose, of course, is to achieve product designs that reflect customer wants as well as manufacturing capabilities.

Traditionally, designers developed a new product without any input from manufacturing, and then turned over the design to manufacturing, which would then have to develop a process for making the new product. This “over-the-wall” approach created tremendous challenges for manufacturing, generating numerous conflicts and greatly increasing the time needed to successfully produce a new product. It also contributed to an “us versus them” mentality.

For these and similar reasons, the simultaneous development approach has great appeal. Among the key advantages of this approach are the following:

1. Manufacturing personnel are able to identify production capabilities and capacities. Very often, they have some latitude in design in terms of selecting suitable materials and processes. Knowledge of production capabilities can help in the selection process. In addition, cost and quality considerations can be greatly influenced by design, and con- flicts during production can be greatly reduced.

2. Design or procurement of critical tooling, some of which might have long lead times, can occur early in the process. This can result in a major shortening of the product development process, which could be a key competitive advantage.

3. The technical feasibility of a particular design or a portion of a design can be assessed early on. Again, this can avoid serious problems during production.

4. The emphasis can be on problem resolution instead of conflict resolution.

However, despite the advantages of concurrent engineering, a number of potential difficul- ties exist in this co-development approach. Two key ones are the following:

1. Long-standing boundaries between design and manufacturing can be difficult to over- come. Simply bringing a group of people together and thinking that they will be able to work together effectively is probably naive.

2. There must be extra communication and flexibility if the process is to work, and these can be difficult to achieve.

Hence, managers should plan to devote special attention if this approach is to work.

Computer-Aided Design (CAD) Computers are increasingly used for product design. Computer-aided design (CAD) uses computer graphics for product design. The designer can modify an existing design or cre- ate a new one on a monitor by means of a light pen, a keyboard, a joystick, or a similar device. Once the design is entered into the computer, the designer can maneuver it on the screen: It can be rotated to provide the designer with different perspectives, it can be split

Concurrent engineering   Bringing engineering design and manufacturing personnel together early in the design phase.

Computer-aided design (CAD)  Product design using computer graphics.

ste24102_ch04_134-170.indd 160ste24102_ch04_134-170.indd 160 16/10/13 11:49 PM16/10/13 11:49 PM

Final PDF to printer

Chapter Four Product and Service Design 161

apart to give the designer a view of the inside, and a portion of it can be enlarged for closer examination. The designer can obtain a printed version of the completed design and file it electronically, making it accessible to people in the firm who need this information (e.g., marketing, operations).

A growing number of products are being designed in this way, including transformers, automobile parts, aircraft parts, integrated circuits, and electric motors.

A major benefit of CAD is the increased productivity of designers. No longer is it neces- sary to laboriously prepare mechanical drawings of products or parts and revise them repeat- edly to correct errors or incorporate revisions. A rough estimate is that CAD increases the productivity of designers from 3 to 10 times. A second major benefit of CAD is the creation of a database for manufacturing that can supply needed information on product geometry and dimensions, tolerances, material specifications, and so on. It should be noted, however, that CAD needs this database to function and that this entails a considerable amount of effort.

Some CAD systems allow the designer to perform engineering and cost analyses on pro- posed designs. For instance, the computer can determine the weight and volume of a part and do stress analysis as well. When there are a number of alternative designs, the computer can quickly go through the possibilities and identify the best one, given the designer’s criteria. CAD that includes finite element analysis (FEA) capability can greatly shorten the time to market of new products. It enables developers to perform simulations that aid in the design, analysis, and commercialization of new products. Designers in industries such as aeronautics, biomechanics, and automotives use FEA.

Production Requirements As noted earlier in the chapter, designers must take into account production capabilities. Design needs to clearly understand the capabilities of production (e.g., equipment, skills, types of materials, schedules, technologies, special abilities). This helps in choosing designs that match capabilities. When opportunities and capabilities do not match, management must consider the potential for expanding or changing capabilities to take advantage of those opportunities.

Forecasts of future demand can be very useful, supplying information on the timing and volume of demand, and information on demands for new products and services.

An architect is using an iPad CAD (computer-aided design) application to model a 3D layout design of a new house.

ste24102_ch04_134-170.indd 161ste24102_ch04_134-170.indd 161 16/10/13 11:49 PM16/10/13 11:49 PM

Final PDF to printer

162 Chapter Four Product and Service Design

Manufacturability is a key concern for manufactured goods: Ease of fabrication and/or assembly is important for cost, productivity, and quality. With services, ease of providing the service, cost, productivity, and quality are of great concern.

The term design for manufacturing (DFM) is used to indicate the designing of products that are compatible with an organization’s capabilities. A related concept in manufacturing is design for assembly (DFA) . A good design must take into account not only how a product will be fabricated, but also how it will be assembled. Design for assembly focuses on reducing the number of parts in an assembly, as well as on the assembly methods and sequence that will be employed. Another, more general term, manufacturability , is sometimes used when referring to the ease with which products can be fabricated and/or assembled.

Component Commonality Companies often have multiple products or services to offer customers. Often, these products or services have a high degree of similarity of features and components. This is particularly true of product families, but it is also true of many services. Companies can realize significant benefits when a part can be used in multiple products. For example, car manufacturers employ this tactic by using internal components such as water pumps, engines, and transmissions on several automobile nameplates. In addition to the savings in design time, companies reap benefits through standard training for assembly and installation, increased opportunities for savings by buying in bulk from suppliers, and commonality of parts for repair, which reduces the inventory dealers and auto parts stores must carry. Similar benefits accrue in services. For example, in automobile repair, component commonality means less training is needed because the variety of jobs is reduced. The same applies to appliance repair, where com- monality and substitutability of parts are typical. Multiple-use forms in financial and medical services is another example. Computer software often comprises a number of modules that are commonly used for similar applications, thereby saving the time and cost to write the code for major portions of the software. Tool manufacturers use a design that allows tool users to attach different power tools to a common power source. Similarly, Hewlett-Packard has a uni- versal power source that can be used with a variety of computer hardware.

4.11 SERVICE DESIGN There are many similarities between product and service design. However, there are some important differences as well, owing to the nature of services. One major difference is that unlike manufacturing, where production and delivery are usually separated in time, services are usually created and delivered simultaneously.

Service refers to an act, something that is done to or for a customer (client, patient, etc.). It is provided by a service delivery system , which includes the facilities, processes, and skills needed to provide the service. Many services are not pure services, but part of a product bundle —the combination of goods and services provided to a customer. The service com- ponent in products is increasing. The ability to create and deliver reliable customer-oriented service is often a key competitive differentiator. Successful companies combine customer- oriented service with their products.

System design involves development or refinement of the overall service package : 1

1. The physical resources needed.

2. The accompanying goods that are purchased or consumed by the customer, or provided with the service.

3. Explicit services (the essential/core features of a service, such as tax preparation).

4. Implicit services (ancillary/extra features, such as friendliness, courtesy).

Design for manufacturing (DFM)  The designing of prod- ucts that are compatible with an organization’s capabilities.

Design for assembly (DFA)   Design that focuses on reducing the number of parts in a product and on assembly methods and sequence.

Manufacturability  The ease of fabrication and/or assembly.

Service  Something that is done to or for a customer.

Service delivery system  The facilities, processes, and skills needed to provide a service.

Product bundle  The com- bination of goods and services provided to a customer.

Service package  The physical resources needed to perform the service, the accompany- ing goods, and the explicit and implicit services included.

1 Adapted from James A. Fitzsimmons and Mona J. Fitzsimmons, Service Management for Competitive Advan- tage (New York: McGraw-Hill, 1994). Copyright © 1994 McGraw-Hill Companies, Inc. Used with permission.

ste24102_ch04_134-170.indd 162ste24102_ch04_134-170.indd 162 16/10/13 11:49 PM16/10/13 11:49 PM

Final PDF to printer

Chapter Four Product and Service Design 163

Overview of Service Design Service design begins with the choice of a service strategy, which determines the nature and focus of the service, and the target market. This requires an assessment by top management of the potential market and profitability (or need, in the case of a nonprofit organization) of a particular service, and an assessment of the organization’s ability to provide the service. Once decisions on the focus of the service and the target market have been made, the customer requirements and expectations of the target market must be determined.

Two key issues in service design are the degree of variation in service requirements and the degree of customer contact and customer involvement in the delivery system. These have an impact on the degree to which service can be standardized or must be customized. The lower the degree of customer contact and service requirement variability, the more standardized the service can be. Service design with no contact and little or no processing variability is very much like product design. Conversely, high variability and high customer contact generally mean the service must be highly customized. A related consideration in service design is the opportunity for selling: The greater the degree of customer contact, the greater the opportuni- ties for selling.

Differences between Service Design and Product Design Service operations managers must contend with issues that may be insignificant or nonexis- tent for managers in a production setting. These include the following:

1. Products are generally tangible; services are generally intangible. Consequently, service design often focuses more on intangible factors (e.g., peace of mind, ambiance) than does product design.

2. In many instances services are created and delivered at the same time (e.g., a haircut, a car wash). In such instances there is less latitude in finding and correcting errors before the customer has a chance to discover them. Consequently, training, process design, and customer relations are particularly important.

3. Services cannot be inventoried. This poses restrictions on flexibility and makes capacity issues very important.

4. Services are highly visible to consumers and must be designed with that in mind; this adds an extra dimension to process design, one that usually is not present in product design.

5. Some services have low barriers to entry and exit. This places additional pressures on service design to be innovative and cost-effective.

6. Location is often important to service design, with convenience as a major factor. Hence, design of services and choice of location are often closely linked.

7. Service systems range from those with little or no customer contact to those that have a very high degree of customer contact. Here are some examples of those different types: Insulated technical core; little or no customer contact (e.g., software development). Production line; little or no customer contact (e.g., automatic car wash). Personalized service (e.g., haircut, medical service). Consumer participation (e.g., diet program, dance lessons). Self-service (e.g., supermarket). If there is little or no customer contact, service system design is like product system design.

8. Demand variability alternately creates waiting lines or idle service resources.

When demand variability is a factor, designers may approach service design from one of two perspectives. One is a cost and efficiency perspective, and the other is a customer per- spective. Waiting line analysis (see Chapter 18) can be especially useful in this regard.

Basing design objectives on cost and efficiency is essentially a “product design approach” to service design. Because customer participation makes both quality and demand variability

LO4.11 Discuss the two key issues in service design.

ste24102_ch04_134-170.indd 163ste24102_ch04_134-170.indd 163 16/10/13 11:49 PM16/10/13 11:49 PM

Final PDF to printer

164 Chapter Four Product and Service Design

more difficult to manage, designers may opt to limit customer participation in the process where possible. Alternatively, designers may use staff flexibility as a means of dealing with demand variability.

In services, a significant aspect of perceived quality relates to the intangibles that are part of the service package. Designers must proceed with caution because attempts to achieve a high level of efficiency tend to depersonalize service and to create the risk of negatively alter- ing the customer’s perception of quality. Such attempts may involve the following:

1. Reducing consumer choices makes service more efficient, but it can be both frustrat- ing and irritating for the customer. An example would be a cable company that bundles channels, rather than allowing customers to pick only the channels they want.

2. Standardizing or simplifying certain elements of service can reduce the cost of provid- ing a service, but it risks eliminating features that some customers value, such as per- sonal attention.

3. Incorporating flexibility in capacity management by employing part-time or temporary staff may involve the use of less-skilled or less-interested people, and service quality may suffer.

Design objectives based on customer perspective require understanding the customer experience, and focusing on how to maintain control over service delivery to achieve cus- tomer satisfaction. The customer-oriented approach involves determining consumer wants and needs in order to understand relationships between service delivery and perceived quality. This enables designers to make enlightened choices in designing the delivery system.

Of course, designers must keep in mind that while depersonalizing service delivery for the sake of efficiency can negatively impact perceived quality, customers may not want or be will- ing to pay for highly personalized service either, so trade-offs may have to be made.

Phases in the Service Design Process Table 4.5 lists the phases in the service design process. As you can see, they are quite similar to the phases of product design, except that the delivery system also must be designed.

Service Blueprinting A useful tool for conceptualizing a service delivery system is the service blueprint , which is a method for describing and analyzing a service process. A service blueprint is much like an architectural drawing, but instead of showing building dimensions and other construc- tion features, a service blueprint shows the basic customer and service actions involved in a service operation. Figure 4.7 illustrates a simple service blueprint for a restaurant. At the top of the figure are the customer actions, and just below are the related actions of the direct contact service people. Next are what are sometimes referred to as “backstage contacts”—in this example, the kitchen staff—and below those are the support, or “backroom,” operations. In this example support operations include the reservation system, ordering of food and sup- plies, cashier, and the outsourcing of laundry service. Figure 4.7 is a simplified illustration; typically time estimates for actions and operations would be included.

Service blueprint  A method used in service design to describe and analyze a proposed service.

1. Conceptualize. Idea generation Assessment of customer wants/needs (marketing) Assessment of demand potential (marketing)

2. Identify service package components needed (operations and marketing). 3. Determine performance specifications (operations and marketing). 4. Translate performance specifications into design specifications. 5. Translate design specifications into delivery specifications.

TABLE 4.5 Phases in service design process

ste24102_ch04_134-170.indd 164ste24102_ch04_134-170.indd 164 16/10/13 11:49 PM16/10/13 11:49 PM

Final PDF to printer

Chapter Four Product and Service Design 165

The major steps in service blueprinting are as follows:

1. Establish boundaries for the service and decide on the level of detail needed.

2. Identify and determine the sequence of customer and service actions and interactions. A flowchart can be a useful tool for this.

3. Develop time estimates for each phase of the process, as well as time variability.

4. Identify potential failure points and develop a plan to prevent or minimize them, as well as a plan to respond to service errors.

Characteristics of Well-Designed Service Systems There are a number of characteristics of well-designed service systems. They can serve as guidelines in developing a service system. They include the following:

1. Being consistent with the organization’s mission.

2. Being user-friendly.

3. Being robust if variability is a factor.

4. Being easy to sustain.

5. Being cost-effective.

6. Having value that is obvious to customers.

7. Having effective linkages between back-of-the-house operations (i.e., no contact with the customer) and front-of-the-house operations (i.e., direct contact with customers). Front operations should focus on customer service, while back operations should focus on speed and efficiency.

8. Having a single, unifying theme, such as convenience or speed.

9. Having design features and checks that will ensure service that is reliable and of high quality.

LO4.12 List the characteris- tics of well-designed service systems.

FIGURE 4.7 A simple service blueprint for a restaurant

Customer actions

line of information

Contact persons

line of visibility

Backstage contacts

Support

Arrive Seated Order Eat Pay and

leave

Greeted by hostess Hostess checks reservation Hostess escorts customers to their table

Greeted by server Server provides menus Server fills water glasses

Server describes specials Server takes orders

Dinners are served

Server occasionally checks to see if any problems

Server brings the check Server receives payment

Busboy clears table

Kitchen staff prepares food

Reservation system

Ordering food Cashier Laundry service

Dishes are washed

line of internal interaction

ste24102_ch04_134-170.indd 165ste24102_ch04_134-170.indd 165 16/10/13 11:49 PM16/10/13 11:49 PM

Final PDF to printer

166 Chapter Four Product and Service Design

Challenges of Service Design Variability is a major concern in most aspects of business operations, and it is particularly so in the design of service systems. Requirements tend to be variable, both in terms of dif- ferences in what customers want or need, and in terms of the timing of customer requests. Because services generally cannot be stored, there is the additional challenge of balancing supply and demand. This is less of a problem for systems in which the timing of services can be scheduled (e.g., doctor’s appointment), but not so in others (e.g., emergency room visit).

Another challenge is that services can be difficult to describe precisely and are dynamic in nature, especially when there is a direct encounter with the customer (e.g., personal services), due to the large number of variables.

Guidelines for Successful Service Design

1. Define the service package in detail. A service blueprint may be helpful for this.

2. Focus on the operation from the customer’s perspective. Consider how customer expec- tations and perceptions are managed during and after the service.

3. Consider the image that the service package will present both to customers and to pro- spective customers.

4. Recognize that designers’ familiarity with the system may give them a quite different perspective than that of the customer, and take steps to overcome this.

5. Make sure that managers are involved and will support the design once it is implemented.

6. Define quality for both tangibles and intangibles. Intangible standards are more difficult to define, but they must be addressed.

7. Make sure that recruitment, training, and reward policies are consistent with service expectations.

8. Establish procedures to handle both predictable and unpredictable events.

9. Establish systems to monitor, maintain, and improve service.

LO4.13 List some guidelines for successful service design.

6. Input variability tends to be higher in many service environments than in manufacturing.

7. Service performance can be adversely affected by workers’ emo- tions, distractions, customers’ attitudes, and other factors, many of which are beyond managers’ control.

Because of these factors, quality and costs are more difficult to con- trol, productivity tends to be lower, the risk of customer dissatisfaction is greater, and employee motivation is more difficult.

Questions

1. What managerial challenges do services present that manufacturing does not?

2. Why does service management present more challenges than manufacturing?

Services can pose a variety of managerial challenges for managers— challenges that in manufacturing are either much less or nonex- istent. And because services represent an increasing share of the economy, this places added importance on understanding and deal- ing with the challenges of managing services. Here are some of the main factors:

1. Jobs in service environments are often less structured than in man- ufacturing environments.

2. Customer contact is usually much higher in services. 3. In many services, worker skill levels are low compared to those of

manufacturing workers. 4. Services are adding many new workers in low-skill, entry-level

positions. 5. Employee turnover is often higher, especially in the low-skill jobs.

READING The Challenges of Managing Services

ed by workers’ emo

nyyyy

ste24102_ch04_134-170.indd 166ste24102_ch04_134-170.indd 166 16/10/13 11:49 PM16/10/13 11:49 PM

Final PDF to printer

Chapter Four Product and Service Design 167

SUMMARY Product and service design is a key factor in satisfying the customer. To be successful in product and service design, organizations must be continually aware of what customers want, what the competition is doing, what government regulations are, and what new technologies are available.

The design process involves motivation, ideas for improvement, organizational capabilities, and forecasting. In addition to product life cycles, legal, environmental, and ethical considerations influence design choices. What degree of standardization designers should incorporate into designs is also an important consideration. A key objective for designers is to achieve a product or service design that will meet or exceed customer expectations, within cost or budget and taking into account the capabilities of operations. Although product design and service design are similar in some respects, a number of key differences exist between products and services that influence the way they are designed.

Successful design often incorporates many of these basic principles: Determine what customers want as a starting point; minimize the number of parts needed to manufacture an item or the number of steps to provide a service; simplify assembly or service, standardize as much as possible; and make the design robust. Trade-off decisions are common in design, and they involve such things as development time and cost, product or service cost, special features/performance, and product or service complexity.

Research and development efforts can play a significant role in product and process innovations, although these are sometimes so costly that only large companies or governments can afford to under- write them.

Reliability of a product or service is often a key dimension in the eyes of the customer. Measuring and improving reliability are important aspects of product and service design, although other areas of the organization also have an influence on reliability.

Quality function deployment is one approach for getting customer input for product or service design.

4.12 OPERATIONS STRATEGY

Product and service design is a fertile area for achieving competitive advantage and/or increas- ing customer satisfaction. Potential sources of such benefits include the following:

• Packaging products and ancillary services to increase sales. Examples include selling PCs at a reduced cost with a two-year Internet access sign-up agreement, offering extended warranties on products, offering installation and service, and offering training with com- puter software.

• Using multiple-use platforms. Auto manufacturers use the same platform (basic chassis, say) for several nameplates (e.g., Jaguar S type, Lincoln LS, and Ford Thunderbird have shared the same platform). There are two basic computer platforms, PC and Mac, with many variations of computers using a particular platform.

• Implementing tactics that will achieve the benefits of high volume while satisfying cus- tomer needs for variety, such as mass customization.

• Continually monitoring products and services for small improvements rather than the “big bang” approach. Often the “little” things can have a positive, long-lasting effect on consumer attitudes and buying behavior.

• Shortening the time it takes to get new or redesigned goods and services to market.

A key competitive advantage of some companies is their ability to bring new products to market more quickly than their competitors. Companies using this “first-to-market” approach are able to enter markets ahead of their competitors, allowing them to set higher selling prices than otherwise due to absence of competition. Such a strategy is also a defense against com- petition from cheaper “clones” because the competitors always have to play “catch up.”

From a design standpoint, reducing the time to market involves

• Using standardized components to create new but reliable products.

• Using technology such as computer-aided design (CAD) equipment to rapidly design new or modified products.

• Concurrent engineering to shorten engineering time.

ste24102_ch04_134-170.indd 167ste24102_ch04_134-170.indd 167 16/10/13 11:49 PM16/10/13 11:49 PM

Final PDF to printer

168 Chapter Four Product and Service Design

1. A range of factors can cause an organization to design or redesign a product or service, includ- ing economic, legal, political, social, technological, and competitive pressures. Furthermore, an important cause of operations failures can be traced to faulty design.

2. Every area of a business organization, and its supply chain, is connected to, and influenced by, its products and/or services, so the potential impact on each area must be taken into account when products or services are redesigned or new products or services are to be designed.

3. Central issues relate to the actual or expected demand for a product or service, the organization’s capabilities, the cost to produce or provide, the desired quality level, and the cost and availability of necessary resources.

4. Among considerations that are generally important are legal, ethical, and environmental.

5. Although there are some basic differences between product design and service design, there are many similarities between the two.

KEY POINTS

KEY TERMS computer-aided design (CAD), 160 concurrent engineering, 160 cradle-to-grave assessment, 144 delayed differentiation, 152 design for assembly (DFA), 162 design for disassembly (DFD), 146 design for manufacturing (DFM), 162 design for recycling (DFR), 147

failure, 153 manufacturability, 136, 162 mass customization, 152 modular design, 152 normal operating conditions, 153 product bundle, 162 product liability, 141 quality function deployment (QFD), 155 recycling, 146 reliability, 153 remanufacturing, 145

research and development (R&D), 139 reverse engineering, 139 robust design, 154 service, 162 service blueprint, 164 service delivery system, 162 service package, 162 serviceability, 136 standardization, 151 Uniform Commercial Code, 141

value analysis, 145

1. What are some of the factors that cause organizations to redesign their products or services?

2. Contrast applied research and basic research.

3. What is CAD? Describe some of the ways a product designer can use it.

4. Name some of the main advantages and disadvantages of standardization.

5. What is modular design? What are its main advantages and disadvantages?

6. Explain the term design for manufacturing and briefly explain why it is important.

7. What are some of the competitive advantages of concurrent engineering?

8. Explain the term remanufacturing.

9. a. What is meant by the term life cycle?

b. Why would this be a consideration in product or service design? c. Name three ways that each of these products has found new uses: baking soda, duct tape, and

vinegar. 10. Why is R&D a key factor in productivity improvement? Name some ways R&D contributes to

productivity improvements.

11. What is mass customization?

12. Name two factors that could make service design much different than product design.

13. Explain the term robust design.

14. Explain what quality function deployment is and how it can be useful.

15. What is reverse engineering? Do you feel this is unethical?

16. What is the purpose of value analysis?

17. What is life cycle assessment, and what is its overall goal?

18. Explain the term “three Rs” and how the three Rs relate to sustainability.

19. a. Select an electronic device you are familiar with. What standard feature does it have that was once a “wow” feature? What “wow” feature does it have that you think will soon be a standard feature on new versions?

b. Answer part a for a service you are familiar with.

DISCUSSION AND REVIEW QUESTIONS

ste24102_ch04_134-170.indd 168ste24102_ch04_134-170.indd 168 11/29/13 1:05 AM11/29/13 1:05 AM

Final PDF to printer

Chapter Four Product and Service Design 169

1. Describe some of the trade-offs that are encountered in product and service design.

2. Who needs to be involved in the design of products and services?

3. How has technology had an impact on product and service design?

TAKING STOCK

CRITICAL THINKING

EXERCISES

1. A number of fast-food chains, after their success with offering their customers fresh salads, and in an effort to downplay the image of selling unhealthy food, began adding fresh fruit plates to their menus. At about the same time, and seemingly in direct conflict with this “healthy” strategy, several other fast-food chains began offering fat- and calorie-laden items to their menus. Compare these two widely different approaches, and predict the chances of each one’s success. Name some other products that are popular, despite known health risks.

2. Think of a new or revised product or service that you would like to see on the market. Discuss the implications of producing that product or service relative to legal, ethical, environmental, profitabil- ity, competitive, design, and production issues.

3. How were food producers impacted by the U.S. government’s requirement to identify the trans fat content on product labels?

4. Suppose a company intends to offer a new service to some of its internal customers. Briefly discuss how the fact that the customers are internal would change the process of managing the four phases of the service life cycle.

5. A few days before the end of the term of a two-year NDA (nondisclosure agreement) he signed with a startup company related to a possible patent, Frank interviewed with another startup and divulged information covered by the agreement. The interview had been scheduled for a week later, in which case it wouldn’t have been an issue, but had been moved up when another job applicant dropped out and the company had an opening for an earlier interview. Frank reasoned that he had met the spirit of the NDA, and a few days early wouldn’t really matter. Besides, as it turned out, the company he interviewed with wasn’t interested in that information, although they did hire him. What would you have done if you were Frank?

6. Give two examples of unethical conduct involving product or service design and the ethical prin- ciples (see Chapter 1) that are violated.

PROBLEMS 1. Examine and compare one of the following product sets. Base your comparison on such factors as features, costs, convenience, ease of use, and value. a. GPS versus maps. b. Cell phones versus landlines. c. Online shopping versus “bricks and mortar” shopping. d. Standard gasoline automobile engines versus hybrids. e. Online course versus classroom. f. Satellite television versus cable.

2. Use the Internet to obtain recent crash-safety ratings for passenger vehicles. Then answer these questions: a. Which vehicles received the highest ratings? The lowest ratings? b. How important are crash-safety ratings to new car buyers? Does the degree of importance

depend on the circumstances of the buyer? c. Which types of buyers would you expect to be the most concerned with crash-safety ratings? d. Are there other features of a new car that might sway a buyer from focusing solely on crash

safety? If so, what might they be?

3. Prepare a service blueprint for each of these banking transactions: a. Make a savings deposit using a teller. b. Apply for a home equity loan.

4. Prepare a service blueprint for each of these post office transactions: a. Buy stamps from a machine. b. Buy stamps from a postal clerk.

5. List the steps involved in getting gasoline into your car for full service and for self-service. Assume that paying cash is the only means of payment. For each list, identify the potential trouble points and indicate a likely problem.

6. Construct a list of steps for making a cash withdrawal from an automated teller machine (ATM). Assume that the process begins at the ATM with your bank card in hand. Then identify the potential failure points (i.e., where problems might arise in the process). For each failure point, state one potential problem.

ste24102_ch04_134-170.indd 169ste24102_ch04_134-170.indd 169 16/10/13 11:49 PM16/10/13 11:49 PM

Final PDF to printer

170 Chapter Four Product and Service Design

7. a. Refer to Figure 4.4 . What two technical requirements have the highest impact on the customer requirement that the paper not tear?

b. The following table presents technical requirements and customer requirements for the output of a laser printer. First, decide if any of the technical requirements relate to each customer require- ment. Decide which technical requirement, if any, has the greatest impact on that customer requirement.

TECHNICAL REQUIREMENTS

Customer Requirements Type of Paper Internal Paper Feed Print Element

Paper doesn’t wrinkle

Prints clearly

Easy to use

8. Prepare a table similar to that shown in Problem 7 b for cookies sold in a bakery. List what you believe are the three most important customer requirements (not including cost) and the three most relevant technical requirements (not including sanitary conditions). Next, indicate by a checkmark which customer requirements and which technical requirements are related.

The High Acres Landfill is located on a 218-acre site outside Fairport, New York. Opened in 1971, it is licensed to handle residential, commer- cial, and industrial nonhazardous waste. The landfill has 27 employees, and it receives approximately 3,000 tons of waste per day.

The public often has certain preconceived notions about a landfill, chief among them that landfills are dirty and unpleasant. However, a visit to the landfill dispelled some of those misconceptions. The entrance is nicely landscaped. Most of the site is planted with grass and a few trees. Although unpleasant odors can emanate from arriving trucks or at the dump site, the remainder of the landfill is relatively free of odors.

A major portion of the landfill consists of a large hill within which the waste is buried. Initially, the landfill began not as a hill but as a large hole in the ground. After a number of years of depositing waste, the hole eventually was filled. From that point on, as additional layers were added, the landfill began to take the shape of a flattop hill. Each layer is a little narrower than the preceding one, giving the hill a slope. The sides of the hill are planted with grass. Only the “working face” along the top remains unplanted. When the designated capacity is exhausted (this may take another 10 years), the landfill will be closed to further

waste disposal. The site will be converted into a public park with hiking trails and picnic and recre- ation areas, and given to the town.

The construction and operation of landfills are subject to numerous state and federal regulations. For example, nonpermeable liners must be placed on the bottom and sides of the landfill to prevent leakage of liquids into the groundwater. (Independent firms monitor groundwater to determine if there is any leakage into wells placed around the perimeter of the hill.) Mindful of public opinion, every effort is made to minimize the amount of time that waste is left exposed. At the end of each day, the waste that has been deposited in the landfill is compacted and cov- ered with six inches of soil.

The primary source of income for the landfill is the fees it charges users. The landfill also generates income from methane gas, a by- product of organic waste decomposition, that accumulates within the landfill. A collection system is in place to capture and extract the gas from the landfill, and it is then sold to the local power company. Also, the landfill has a composting operation in which leaves and other yard wastes are converted into mulch.

OPERATIONS TOUR High Acres Landfill

SELECTED BIBLIOGRAPHY AND FURTHER READINGS

Davis, Mark M., and Janelle Heineke. Managing Ser- vices: Using Technology to Create Value. New York: McGraw-Hill/Irwin, 2003.

Fitzsimmons, James A., and Mona J. Fitzsimmons. Service Management: Operations, Strategy, and Information Technology. 7th ed. New York: McGraw-Hill, 2011.

Gilmore, James, and B. Joseph Pine II. Markets of One: Creating Customer-Unique Value through Mass Customization. Boston: Harvard Business School Press, 2000.

Gorman, Michael E. Transforming Nature: Ethics, Invention, and Design. Boston: Kluwer Academic Publishers, 1998.

Groover, Mikell P. Automation, Production Systems, and Computer-Aided Manufacturing. 3rd ed. Engle- wood Cliffs, NJ: Prentice Hall, 2008.

Lovelock, Christopher H. Services Marketing: People, Technology, Strategy. 3rd ed. Englewood Cliffs, NJ: Prentice Hall, 2010.

Ulrich, Karl T., and Steven D. Eppinger. Product Design and Development. 3rd ed. New York: McGraw-Hill, 2004.

Vicente, Kim. The Human Factor. New York: Rout- ledge, 2004.

ste24102_ch04_134-170.indd 170ste24102_ch04_134-170.indd 170 11/29/13 1:05 AM11/29/13 1:05 AM

Final PDF to printer

171

SUPPLEMENT TO

C H A P T E R

4S.1 INTRODUCTION Reliability is a measure of the ability of a product, service, part, or system to perform its intended function under a prescribed set of conditions. In effect, reliability is a probability.

Suppose that an item has a reliability of .90. This means that it has a 90 percent probability of functioning as intended. The probability it will fail is 1  �  .90  �  .10, or 10 percent. Hence, it is expected that, on the average, 1 of every 10 such items will fail or, equivalently, that the item will fail, on the average, once in every 10 trials. Similarly, a reliability of .985 implies 15 failures per 1,000 parts or trials.

4S.2 QUANTIFYING RELIABILITY Engineers and designers have a number of techniques at their disposal for assessing reliability. A discussion of those techniques is not within the scope of this text. Instead, let us turn to the issue of quantifying overall product or system reliability. Probability is used in two ways.

1. The probability that the product or system will function when activated.

2. The probability that the product or system will function for a given length of time.

The first of these focuses on one point in time and is often used when a system must operate for one time or a relatively few number of times. The second of these focuses on the length of service. The distinction will become more apparent as each of these approaches is described in more detail.

Reliability  The ability of a product, service, part, or system to perform its intended func- tion under a prescribed set of conditions.

4 SUPPLEMENT OUTLINE

4S.1 Introduction, 171

4S.2 Quantifying Reliability, 171 Finding the Probability of Functioning When Activated, 172

Finding the Probability of Functioning for a Given Length of Time, 173

4S.3 Availability, 177

Key Terms, 178

Solved Problems, 178

Discussion and Review Questions, 181

Problems, 181

Reliability LEARNING OBJECTIVES After completing this supplement, you should be able to: LO4S.1 Define reliability.

LO4S.2 Perform simple reliability computations.

LO4S.3 Explain the term availability and perform simple calculations.

LO4S.1 Define reliability.

ste24102_ch04s_171-183.indd 171ste24102_ch04s_171-183.indd 171 16/10/13 11:51 PM16/10/13 11:51 PM

Final PDF to printer

172 Supplement to Chapter Four Reliability

Finding the Probability of Functioning When Activated The probability that a system or a product will operate as planned is an important concept in system and product design. Determining that probability when the product or system consists of a number of independent components requires the use of the rules of probability for inde- pendent events. Independent events have no relation to the occurrence or nonoccurrence of each other. What follows are three examples illustrating the use of probability rules to deter- mine whether a given system will operate successfully.

Rule 1. If two or more events are independent and success is defined as the probability that all of the events occur, then the probability of success is equal to the product of the probabili- ties of the events.

Example Suppose a room has two lamps, but to have adequate light both lamps must work (success) when turned on. One lamp has a probability of working of .90, and the other has a probability of working of .80. The probability that both will work is .90  �  .80  �  .72. Note that the order of multiplication is unimportant: .80  �  .90  �  .72. Also note that if the room had three lamps, three probabilities would have been multiplied.

This system can be represented by the following diagram:

.90 .80

Lamp 1 Lamp 2

Even though the individual components of a system might have high reliabilities, the sys- tem as a whole can have considerably less reliability because all components that are in series (as are the ones in the preceding example) must function. As the number of components in a series increases, the system reliability decreases. For example, a system that has eight compo- nents in a series, each with a reliability of .99, has a reliability of only .99 8   �  .923.

Obviously, many products and systems have a large number of component parts that must all operate, and some way to increase overall reliability is needed. One approach is to use redundancy in the design. This involves providing backup parts for some items.

Rule 2. If two events are independent and success is defined as the probability that at least one of the events will occur, the probability of success is equal to the probability of either one plus 1.00 minus that probability multiplied by the other probability.

Example There are two lamps in a room. When turned on, one has a probability of working of .90 and the other has a probability of working of .80. Only a single lamp is needed to light for success. If one fails to light when turned on, the other lamp is turned on. Hence, one of the lamps is a backup in case the other one fails. Either lamp can be treated as the backup; the prob- ability of success will be the same. The probability of success is .90  �  (1  �  .90)  �  .80  �  .98. If the .80 light is first, the computation would be .80  �  (1  �  .80)  �  .90  �  .98.

This system can be represented by the following diagram:

.90 Lamp 1

.80 Lamp 2 (backup)

Rule 3. If two or more events are involved and success is defined as the probability that at least one of them occurs, the probability of success is 1  �   P (all fail).

LO4S.2 Perform simple reli- ability computations.

Independent events  Events whose occurrence or nonoccur- rence does not influence each other.

Redundancy  The use of backup components to increase reliability.

ste24102_ch04s_171-183.indd 172ste24102_ch04s_171-183.indd 172 16/10/13 11:51 PM16/10/13 11:51 PM

Final PDF to printer

Supplement to Chapter Four Reliability 173

Example Three lamps have probabilities of .90, .80, and .70 of lighting when turned on. Only one lighted lamp is needed for success; hence, two of the lamps are considered to be backups. The probability of success is

� � � � � � �1 [(1 .90) (1 .80) (1 .70)] .994

This system can be represented by the following diagram:

.90 Lamp 1

.80 Lamp 2 (backup for Lamp 1)

.70 Lamp 3 (backup for Lamp 2)

LO4S.2 Perform simple reliability computations.

E X A M P L E 4 S – 1

Determine the reliability of the system shown below.

.98 .90 .95

.90 .92 e celx mhhe.com/stevenson12e

S O L U T I O N The system can be reduced to a series of three components:

.98 .90 � .90(1 � .90) .95 � .92(1 � .95)

The system reliability is, then, the product of these:

� � �.98 .99 .996 .966

Finding the Probability of Functioning for a Given Length of Time The second way of looking at reliability considers the incorporation of a time dimension: Probabilities are determined relative to a specified length of time. This approach is com- monly used in product warranties, which pertain to a given period of time after purchase of a product.

A typical profile of product failure rate over time is illustrated in Figure 4S.1 . Because of its shape, it is sometimes referred to as a bathtub curve. Frequently, a number of products fail shortly after they are put into service, not because they wear out, but because they are defec- tive to begin with. The rate of failures decreases rapidly once the truly defective items are weeded out. During the second phase, there are fewer failures because most of the defective items have been eliminated, and it is too soon to encounter items that fail because they have worn out. In some cases, this phase covers a relatively long time. In the third phase, failures occur because the products are worn out, and the failure rate increases.

Information on the distribution and length of each phase requires the collection of histori- cal data and analysis of those data. It often turns out that the mean time between failures (MTBF) in the infant mortality phase can be modeled by a negative exponential distribution, such as that depicted in Figure 4S.2 . Equipment failures as well as product failures may occur in this pattern. In such cases, the exponential distribution can be used to determine various

Mean time between failures (MTBF)  The average length of time between failures of a prod- uct or component.

ste24102_ch04s_171-183.indd 173ste24102_ch04s_171-183.indd 173 16/10/13 11:51 PM16/10/13 11:51 PM

Final PDF to printer

174 Supplement to Chapter Four Reliability

probabilities of interest. The probability that equipment or a product put into service at time 0 will fail before some specified time, T, is equal to the area under the curve between 0 and T. Reliability is specified as the probability that a product will last at least until time T; reli- ability is equal to the area under the curve beyond T. (Note that the total area under the curve in each phase is treated as 100 percent for computational purposes.) Observe that as the speci- fied length of service increases, the area under the curve to the right of that point (i.e., the reliability) decreases.

Determining values for the area under a curve to the right of a given point, T, becomes a relatively simple matter using a table of exponential values. An exponential distribution is completely described using a single parameter, the distribution mean, which reliability engi- neers often refer to as the mean time between failures. Using the symbol T to represent length of service, the probability that failure will not occur before time T (i.e., the area in the right tail) is easily determined:

� �(no failure before ) /MTBFP T e T

where

2.7183

Length of service before failure

MTBF Mean time between failures

…e T

The probability that failure will occur before time T is:

� � �(failure before ) 1 /MTBFP T e T

Selected values of e � T /MTBF are listed in Table 4S.1 .

FIGURE 4S.1 Failure rate is a function of time

Infant mortality

Few (random) failures

Failures due to wear-out

Time, T

0

Fa ilu

re r

at e

FIGURE 4S.2 An exponential distribution

T

Time

Reliability = e �T /MTBF

1 � e �T /MTBF

0

f (T )

ste24102_ch04s_171-183.indd 174ste24102_ch04s_171-183.indd 174 16/10/13 11:51 PM16/10/13 11:51 PM

Final PDF to printer

Supplement to Chapter Four Reliability 175

TABLE 4S.1 Values of e � T /MTBF

T /MTBF e � T /MTBF T /MTBF e � T /MTBF T /MTBF e � T /MTBF

0.10 .9048 2.60 .0743 5.10 .0061 0.20 .8187 2.70 .0672 5.20 .0055 0.30 .7408 2.80 .0608 5.30 .0050 0.40 .6703 2.90 .0550 5.40 .0045 0.50 .6065 3.00 .0498 5.50 .0041 0.60 .5488 3.10 .0450 5.60 .0037 0.70 .4966 3.20 .0408 5.70 .0033 0.80 .4493 3.30 .0369 5.80 .0030 0.90 .4066 3.40 .0334 5.90 .0027 1.00 .3679 3.50 .0302 6.00 .0025 1.10 .3329 3.60 .0273 6.10 .0022 1.20 .3012 3.70 .0247 6.20 .0020 1.30 .2725 3.80 .0224 6.30 .0018 1.40 .2466 3.90 .0202 6.40 .0017 1.50 .2231 4.00 .0183 6.50 .0015 1.60 .2019 4.10 .0166 6.60 .0014 1.70 .1827 4.20 .0150 6.70 .0012 1.80 .1653 4.30 .0136 6.80 .0011 1.90 .1496 4.40 .0123 6.90 .0010 2.00 .1353 4.50 .0111 7.00 .0009 2.10 .1255 4.60 .0101 2.20 .1108 4.70 .0091 2.30 .1003 4.80 .0082 2.40 .0907 4.90 .0074 2.50 .0821 5.00 .0067

By means of extensive testing, a manufacturer has determined that its Super Sucker Vacuum Cleaner models have an expected life that is exponential with a mean of four years. Find the probability that one of these cleaners will have a life that ends

a. After the initial four years of service.

b. Before four years of service are completed.

c. Not before six years of service.

e celx mhhe.com/stevenson12e

E X A M P L E 4 S – 2

MTBF  �  4 years

a. T   �  4 years:

� �/MTBF

4 years

4 years 1.0T

From Table 4S.1 ,  e � 1.0   �  .3679.

b. The probability of failure before T   �  4 years is 1  �   e � 1 , or 1  �  .3679  �  .6321.

c. T   �  6 years:

� �/MTBF

6 years

4 years 1.50T

From Table 4S.1 , e � 1.5   �  .2231.

Product failure due to wear-out can sometimes be modeled by a normal distribution. Obtaining probabilities involves the use of a table (refer to Appendix Table B). The table

S O L U T I O N

ste24102_ch04s_171-183.indd 175ste24102_ch04s_171-183.indd 175 16/10/13 11:51 PM16/10/13 11:51 PM

Final PDF to printer

176 Supplement to Chapter Four Reliability

provides areas under a normal curve from (essentially) the left end of the curve to a specified point z, where z is a standardized value computed using the formula

� � Mean wear-out time

Standard deviation of wear-out time z

T

Thus, to work with the normal distribution, it is necessary to know the mean of the distri- bution and its standard deviation. A normal distribution is illustrated in Figure 4S.3 . Appendix Table B contains normal probabilities (i.e., the area that lies to the left of z ). To obtain a prob- ability that service life will not exceed some value T, compute z and refer to the table. To find the reliability for time T, subtract this probability from 100 percent. To obtain the value of T that will provide a given probability, locate the nearest probability under the curve to the left in Appendix Table B. Then use the corresponding z in the preceding formula and solve for T.

FIGURE 4S.3 A normal curve

Reliability

0 z

z scale

Mean life Years

T

The mean life of a certain ball bearing can be modeled using a normal distribution with a mean of six years and a standard deviation of one year. Determine each of the following:

a. The probability that a ball bearing will wear out before seven years of service.

b. The probability that a ball bearing will wear out after seven years of service (i.e., find its reliability).

c. The service life that will provide a wear-out probability of 10 percent.

e celx mhhe.com/stevenson12e

Wear-out life mean  �  6 years.

Wear out life standard deviation  �  1 year.

Wear-out life is normally distributed.

a. Compute z and use it to obtain the probability directly from Appendix Table B (see diagram).

0 +1.00

z scale

6 Years

7

.8413

7 6

1 1.00=

− = +z

Thus, P ( T  < 7)  �  .8413.

E X A M P L E 4 S – 3

S O L U T I O N

ste24102_ch04s_171-183.indd 176ste24102_ch04s_171-183.indd 176 16/10/13 11:51 PM16/10/13 11:51 PM

Final PDF to printer

Supplement to Chapter Four Reliability 177

A copier is able to operate for an average of 200 hours between repairs, and the mean repair time is two hours. Determine the availability of the copier.

e celx mhhe.com/stevenson12e

LO4S.3 Define the term availability and perform simple calculations.

0 +1.00

z scale

6 Years

7

.1587 � �1.00 .8413 .1587

0z = �1.28

z scale

6 Years

90%

10%

4.72

� � � �

1.28 6

1 z

T

b. Subtract the probability determined in part a from 100 percent (see diagram).

c. Use the normal table and find the value of z that corresponds to an area under the curve of 10 percent (see diagram).

Solving for T, we find T   �  4.72 years.

4S.3 AVAILABILITY A related measure of importance to customers, and hence to designers, is availability . It measures the fraction of time a piece of equipment is expected to be operational (as opposed to being down for repairs). Availability can range from zero (never available) to 1.00 (always available). Companies that can offer equipment with a high availability factor have a com- petitive advantage over companies that offer equipment with lower availability values. Avail- ability is a function of both the mean time between failures and the mean time to repair. The availability factor can be computed using the following formula:

� �

Availability MTBF

MTBF MTR

where MTBF  �  Mean time between failures

MTR  �  Mean time to repair, including waiting time

Availability  The fraction of time a piece of equipment is expected to be available for operation.

E X A M P L E 4 S – 4

ste24102_ch04s_171-183.indd 177ste24102_ch04s_171-183.indd 177 16/10/13 11:51 PM16/10/13 11:51 PM

Final PDF to printer

178 Supplement to Chapter Four Reliability

SOLVED PROBLEMS

MTBF � 200 hours and MTR � 2 hours

� �

� �

�Availability MTBF

MTBF MTR

200

200 2 .99

Two implications for design are revealed by the availability formula. One is that avail- ability increases as the mean time between failures increases. The other is that availability also increases as the mean repair time decreases. It would seem obvious that designers would want to design products that have a long time between failures. However, some design options enhance repairability, which can be incorporated into the product. Ink-jet printers, for exam- ple, are designed with print cartridges that can easily be replaced.

KEY TERMS availability, 177 independent events, 172

mean time between failures (MTBF), 173

redundancy, 172 reliability, 171

S O L U T I O N

Problem 1 A product design engineer must decide if a redundant component is cost-justified in a certain system. The system in question has a critical component with a probability of .98 of operating. System failure would involve a cost of $20,000. For a cost of $100, a switch could be added that would automati- cally transfer the system to the backup component in the event of a failure. Should the backup be added if the backup probability is also .98?

Solution Because no probability is given for the switch, we will assume its probability of operating when needed is 100 percent. The expected cost of failure (i.e., without the backup) is $20,000  �  (1  �  .98)  �  $400.

With the backup, the probability of not failing would be:

� �.98 .02(.98) .9996

Hence, the probability of failure would be 1  �  .9996  �  .0004. The expected cost of failure with the backup would be the added cost of the backup component plus the failure cost:

� �$100 $20,000(.0004) $108

Because this is less than the cost without the backup, it appears that adding the backup is definitely cost justifiable.

Problem 2 Due to the extreme cost of interrupting production, a firm has two standby machines available in case a particular machine breaks down. The machine in use has a reliability of .94, and the backups have reliabilities of .90 and .80. In the event of a failure, either backup can be pressed into service. If one fails, the other backup can be used. Compute the system reliability.

Solution � � �.94, .90, and .801 2 3R R R

The system can be depicted in this way:

.94

.90

.80

� � � � � �(1 ) (1 )(1 )system 1 2 1 3 2 1R R R R R R R

� � � � � � �.94 .90(1 .94) .80(1 .90)(1 .94) .9988 (continued)

ste24102_ch04s_171-183.indd 178ste24102_ch04s_171-183.indd 178 16/10/13 11:51 PM16/10/13 11:51 PM

Final PDF to printer

Supplement to Chapter Four Reliability 179

A hospital has three independent fire alarm systems, with reliabilities of .95, .97, and .99. In the event of a fire, what is the probability that a warning would be given?

Problem 3

Solution A warning would not be given if all three alarms failed. The probability that at least one alarm would operate is 1  �   P (none operate):

� � � � �

� � �

P

P

(none operate) (1 .95)(1 .97)(1 .99) .000015

(warning) 1 .000015 .999985

Problem 4 A weather satellite has an expected life of 10 years from the time it is placed into earth orbit. Deter- mine its probability of no wear-out before each of the following lengths of service. Assume the exponential distribution is appropriate.

a. 5 years. b. 12 years. c. 20 years. d. 30 years.

� MTBF 10 years

Solution Compute the ratio T /MTBF for T   �   5,  12,  20, and 30, and obtain the values of e � T /MTBF from Table 4S.1 . The solutions are summarized in the following table:

T MTBF T /MTBF e � T /MTBF

a. 5 10 0.50 .6065

b. 12 10 1.20 .3012

c. 20 10 2.00 .1353

d. 30 10 3.00 .0498

Problem 5 What is the probability that the satellite described in Solved Problem 4 will fail between 5 and 12 years after being placed into earth orbit?

Solution � � � �(5 years failure 12 years) (failure after 5 years) (failure after 12 years)P P P

Using the probabilities shown in the previous solution, you obtain:

P(failure after � years) � .6065 �P(failure after 12 years) � .3012

.3053

The corresponding area under the curve is illustrated as follows:

125

Years

0

f( t)

.3053

P (5 < Failure < 12)

(continued)

ste24102_ch04s_171-183.indd 179ste24102_ch04s_171-183.indd 179 16/10/13 11:51 PM16/10/13 11:51 PM

Final PDF to printer

180 Supplement to Chapter Four Reliability

One line of radial tires produced by a large company has a wear-out life that can be modeled using a normal distribution with a mean of 25,000 miles and a standard deviation of 2,000 miles. Determine each of the following:

a. The percentage of tires that can be expected to wear out within �  2,000 miles of the average (i.e., between 23,000 miles and 27,000 miles).

b. The percentage of tires that can be expected to fail between 26,000 miles and 29,000 miles.

c. For what tire life would you expect 4 percent of the tires to have worn out?

Problem 6

Solution Notes: (1) Miles are analogous to time and are handled in exactly the same way; (2) the term percent- age refers to a probability.

a. The phrase “within �  2,000 miles of the average” translates to within one standard deviation of the mean since the standard deviation equals 2,000 miles. Therefore the range of z is z   �   �  1.00, to z   �   � 1.00, and the area under the curve between those points is found as the difference between P ( z  < �1.00) and P ( z  <  �  1.00), using values obtained from Appendix Table B.

� � �

� � � �

� � � � �

( 1.00) .8413

( 1.00) .1587

( 1.00 1.00) .6826

P z

P z

P z

0 +1.00

.6826

–1.00

.1587

.8413

b. Wear-out mean  �  25,000 miles Wear-out standard deviation  �  2,000 miles

P(26,000 < Wear-out < 29,000) � P(z < z29,000) � P(z < z26,000)

� �

� � �

� �

� � �

29,000 25,000

2,000 2.00 From Appendix Table B .9772

26,000 25,000

2,000 .50 From Appendix Table B .6915

29,000

26,000

z P

z P

The difference is .9772  �  .6915  �  .2857, which is the expected percent of tires that will wear out between 26,000 miles and 29,000 miles.

0 +.50 +2.00

.6915

.9772

.2857

c. Use Appendix Table B.1 to find z for 4 percent: z   �   �  1.75.

Find tire life using �   �   z : 25,000  �  1.75(2,000)  �  21,500 miles.

ste24102_ch04s_171-183.indd 180ste24102_ch04s_171-183.indd 180 16/10/13 11:51 PM16/10/13 11:51 PM

Final PDF to printer

Supplement to Chapter Four Reliability 181

DISCUSSION AND REVIEW QUESTIONS

1. Define the term reliability.

2. Explain why a product or system might have an overall reliability that is low even though it is com- prised of components that have fairly high reliabilities.

3. What is redundancy and how can it improve product design?

PROBLEMS 1. Consider the following system:

.90 .90

Determine the probability that the system will operate under each of these conditions: a. The system as shown. b. Each system component has a backup with a probability of .90 and a switch that is 100 percent

reliable. c. Backups with .90 probability and a switch that is 99 percent reliable.

2. A product is composed of four parts. In order for the product to function properly in a given situa- tion, each of the parts must function. Two of the parts have a .96 probability of functioning, and two have a probability of .99. What is the overall probability that the product will function properly?

3. A system consists of three identical components. In order for the system to perform as intended, all of the components must perform. Each has the same probability of performance. If the system is to have a .92 probability of performing, what is the minimum probability of performing needed by each of the individual components?

4. A product engineer has developed the following equation for the cost of a system component: C   �  (10 P ) 2 , where C is the cost in dollars and P is the probability that the component will operate as expected. The system is composed of two identical components, both of which must operate for the system to operate. The engineer can spend $173 for the two components. To the nearest two decimal places, what is the largest component probability that can be achieved?

5. The guidance system of a ship is controlled by a computer that has three major modules. In order for the computer to function properly, all three modules must function. Two of the modules have reliabilities of .97, and the other has a reliability of .99. a. What is the reliability of the computer? b. A backup computer identical to the one being used will be installed to improve overall reli-

ability. Assuming the new computer automatically functions if the main one fails, determine the resulting reliability.

c. If the backup computer must be activated by a switch in the event that the first computer fails, and the switch has a reliability of .98, what is the overall reliability of the system? ( Both the switch and the backup computer must function in order for the backup to take over.)

6. One of the industrial robots designed by a leading producer of servomechanisms has four major components. Components’ reliabilities are .98, .95, .94, and .90. All of the components must func- tion in order for the robot to operate effectively. a. Compute the reliability of the robot. b. Designers want to improve the reliability by adding a backup component. Due to space limita-

tions, only one backup can be added. The backup for any component will have the same reli- ability as the unit for which it is the backup. Which component should get the backup in order to achieve the highest reliability?

c. If one backup with a reliability of .92 can be added to any one of the main components, which component should get it to obtain the highest overall reliability?

7. A production line has three machines A, B, and C, with reliabilities of .99, .96, and .93, respec- tively. The machines are arranged so that if one breaks down, the others must shut down. Engineers are weighing two alternative designs for increasing the line’s reliability. Plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. In either case, three machines (A, B, and C) would be used with reliabilities equal to the original three. a. Which plan will provide the higher reliability? b. Explain why the two reliabilities are not the same. c. What other factors might enter into the decision of which plan to adopt?

ste24102_ch04s_171-183.indd 181ste24102_ch04s_171-183.indd 181 11/29/13 1:05 AM11/29/13 1:05 AM

Final PDF to printer

182 Supplement to Chapter Four Reliability

8. Refer to the previous problem. a. Assume that the single switch used in plan 1 is 98 percent reliable, while reliabilities of the

machines remain the same. Recalculate the reliability of plan 1. Compare the reliability of this plan with the reliability of plan 1 calculated in solving the original problem. How much did the reliability of plan 1 decrease as a result of a 98 percent reliable switch?

b. Assume that the three switches used in plan 2 are all 98 percent reliable, while reliabilities of the machines remain the same. Recalculate the reliability of plan 2. Compare the reliability of this plan with the reliability of plan 2 calculated in solving the original problem. How much did the reliability of plan 2 decrease?

9. A Web server has five major components that must all function in order for it to operate as intended. Assuming that each component of the system has the same reliability, what is the minimum reliability each one must have in order for the overall system to have a reliability of .98?

10. Repeat Problem 9 under the condition that one of the components will have a backup with a reliability equal to that of any one of the other components.

11. Hoping to increase the chances of reaching a performance goal, the director of a research project has assigned three separate research teams the same task. The director estimates that the team probabilities are .9, .8, and .7 for successfully completing the task in the allotted time. Assuming that the teams work independently, what is the probability that the task will not be completed in time?

12. An electronic chess game has a useful life that is exponential with a mean of 30 months. Deter- mine each of the following: a. The probability that any given unit will operate for at least (1) 39 months, (2) 48 months,

(3) 60 months. b. The probability that any given unit will fail sooner than (1) 33 months, (2) 15 months, (3) 6 months. c. The length of service time after which the percentage of failed units will approximately equal

(1) 50 percent, (2) 85 percent, (3) 95 percent, (4) 99 percent.

13. A manufacturer of programmable calculators is attempting to determine a reasonable free-service period for a model it will introduce shortly. The manager of product testing has indicated that the calculators have an expected life of 30 months. Assume product life can be described by an expo- nential distribution. a. If service contracts are offered for the expected life of the calculator, what percentage of those

sold would be expected to fail during the service period? b. What service period would result in a failure rate of approximately 10 percent?

14. Lucky Lumen light bulbs have an expected life that is exponentially distributed with a mean of 20,000 hours. Determine the probability that one of these light bulbs will last a. At least 24,000 hours. b. No longer than 4,000 hours. c. Between 4,000 hours and 24,000 hours.

15. Planetary Communications, Inc., intends to launch a satellite that will enhance reception of television programs in Alaska. According to its designers, the satellite will have an expected life of six years. Assume the exponential distribution applies. Determine the probability that it will function for each of the following time periods: a. More than 9 years. b. Less than 12 years. c. More than 9 years but less than 12 years. d. At least 21 years.

16. An office manager has received a report from a consultant that includes a section on equipment replacement. The report indicates that scanners have a service life that is normally distributed with a mean of 41 months and a standard deviation of 4 months. On the basis of this information, determine the percentage of scanners that can be expected to fail in the following time periods: a. Before 38 months of service. b. Between 40 and 45 months of service. c. Within �  2 months of the mean life.

17. A major television manufacturer has determined that its 40-inch LED televisions have a mean service life that can be modeled by a normal distribution with a mean of six years and a standard deviation of one-half year. a. What probability can you assign to service lives of at least (1) Five years? (2) Six years?

(3) Seven and one-half years?

ste24102_ch04s_171-183.indd 182ste24102_ch04s_171-183.indd 182 16/10/13 11:51 PM16/10/13 11:51 PM

Final PDF to printer

Supplement to Chapter Four Reliability 183

b. If the manufacturer offers service contracts of four years on these televisions what percentage can be expected to fail from wear-out during the service period?

18. Refer to Problem 17. What service period would achieve an expected wear-out rate of a. 2 percent? b. 5 percent?

19. Determine the availability for each of these cases: a. MTBF  �  40 days, average repair time  �  3 days. b. MTBF  �  300 hours, average repair time  �  6 hours.

20. A machine can operate for an average of 10 weeks before it needs to be overhauled, a process which takes two days. The machine is operated five days a week. Compute the availability of this machine. ( Hint: All times must be in the same units.)

21. A manager must decide between two machines. The manager will take into account each machine’s operating costs and initial costs, and its breakdown and repair times. Machine A has a projected average operating time of 142 hours and a projected average repair time of 7 hours. Projected times for machine B are an average operating time of 65 hours and a repair time of 2 hours. What are the projected availabilities of each machine?

22. A designer estimates that she can ( a ) increase the average time between failures of a part by 5  percent at a cost of $450, or ( b ) reduce the average repair time by 10 percent at a cost of $200. Which option would be more cost-effective? Currently, the average time between failures is 100 hours and the average repair time is 4 hours.

23. Auto batteries have an average life of 2.7 years. Battery life is normally distributed with a mean of 2.7 years and a standard deviation of .3 year. The batteries are warranted to operate for a minimum of 2 years. If a battery fails within the warranty period, it will be replaced with a new battery at no charge. The company sells and installs the batteries. Also, the usual $5 installation charge will be waived.

a. What percentage of batteries would you expect to fail before the warranty period expires?

b. A competitor is offering a warranty of 30 months on its premium battery. The manager of this company is toying with the idea of using the same battery with a different exterior, labeling it as a premium battery, and offering a 30-month warranty on it. How much more would the company have to charge on its “premium” battery to offset the additional cost of replacing batteries?

c. What other factors would you take into consideration besides the price of the battery?

ste24102_ch04s_171-183.indd 183ste24102_ch04s_171-183.indd 183 16/10/13 11:51 PM16/10/13 11:51 PM

Final PDF to printer

184

C H A P T E R

5 CHAPTER OUTLINE

5.1 Introduction, 185

5.2 Capacity Decisions Are Strategic, 187

5.3 Defining and Measuring Capacity, 188

5.4 Determinants of Effective Capacity, 189

5.5 Strategy Formulation, 191 Steps in the Capacity Planning Process, 192

5.6 Forecasting Capacity Requirements, 192 Calculating Processing Requirements, 193

5.7 Additional Challenges of Planning Service Capacity, 194

5.8 Do It In-House or Outsource It? 195

5.9 Developing Capacity Strategies, 196

5.10 Constraint Management, 201

5.11 Evaluating Alternatives, 201

Cost–Volume Analysis, 202

Financial Analysis, 205

Decision Theory, 206

Waiting-Line Analysis, 206

Simulation, 206

5.12 Operations Strategy, 207

Case: Outsourcing of Hospital Services, 215

Supplement: Decision Theory, 216

Strategic Capacity Planning for Products and Services

After completing this chapter, you should be able to:

LO5.1 Name the three key questions in capacity planning.

LO5.2 Explain the importance of capacity planning.

LO5.3 Describe ways of defining and measuring capacity.

LO5.4 Name several determinants of effective capacity.

LO5.5 Discuss factors to consider when deciding whether to operate in-house or outsource.

LO5.6 Discuss the major considerations related to developing capacity alternatives.

LO5.7 Describe the steps that are used to resolve constraint issues.

LO5.8 Briefly describe approaches that are useful for evaluating capacity alternatives.

LEARNING OBJECTIVES

ste24102_ch05_184-215.indd 184ste24102_ch05_184-215.indd 184 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

185

Capacity planning is a key strategic component in designing the system. It encompasses many basic decisions with long-term consequences for the organization. In this chapter, you will learn about the importance of capacity decisions, the measurement of capacity, how capacity requirements are determined, and the development and evaluation of capacity alternatives. Note that decisions made in the product or service design stage have major implications for capacity planning. Designs have processing requirements related to volume and degree of customization that affect capacity planning.

5.1 INTRODUCTION Hospitals that not too long ago had what could be described as “facility oversupply” are now experiencing what can be described as a “capacity crisis” in some areas. The way hos- pitals plan for capacity will be critical to their future success. And the same applies to all sorts of organizations, and at all levels of these organizations. Capacity refers to an upper limit or ceiling on the load that an operating unit can handle. The load might be in terms of the number of physical units produced (e.g., bicycles assembled per hour) or the number of services performed (e.g., computers upgraded per hour). The operating unit might be a plant, department, machine, store, or worker. Capacity needs include equipment, space, and employee skills.

The goal of strategic capacity planning is to achieve a match between the long-term sup- ply capabilities of an organization and the predicted level of long-term demand. Organiza- tions become involved in capacity planning for various reasons. Among the chief reasons are changes in demand, changes in technology, changes in the environment, and perceived threats or opportunities. A gap between current and desired capacity will result in capacity that is out of balance. Overcapacity causes operating costs that are too high, while undercapacity causes strained resources and possible loss of customers.

Capacity  The upper limit or ceiling on the load that an operating unit can handle.

Demand forecast

Capacity planning

ste24102_ch05_184-215.indd 185ste24102_ch05_184-215.indd 185 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

186

The key questions in capacity planning are the following:

1. What kind of capacity is needed?

2. How much is needed to match demand?

3. When is it needed?

The question of what kind of capacity is needed depends on the products and services that management intends to produce or provide. Hence, in a very real sense, capacity planning is governed by those choices.

Forecasts are key inputs used to answer the questions of how much capacity is needed and when is it needed.

Related questions include:

1. How much will it cost, how will it be funded, and what is the expected return?

2. What are the potential benefits and risks? These involve the degree of uncertainty related to forecasts of the amount of demand and the rate of change in demand, as well as costs, profits, and the time to implement capacity changes. The degree of accuracy that can be attached to forecasts is an important consideration. The likelihood and impact of wrong decisions also need to be assessed.

3. Are there sustainability issues that need to be addressed?

4. Should capacity be changed all at once, or through several (or more) small changes?

5. Can the supply chain handle the necessary changes? Before an organization commits to ramping up its input, it is essential to confirm that its supply chain will be able to handle related requirements.

Because of uncertainties, some organizations prefer to delay capacity investment until demand materializes. However, such strategies often inhibit growth because adding capacity takes time and customers won’t usually wait. Conversely, organizations that add capacity in anticipation of growth often discover that the new capacity actually attracts growth. Some organizations “hedge their bets” by making a series of small changes and then evaluating the results before committing to the next change.

In some instances, capacity choices are made very infrequently; in others, they are made regularly, as part of an ongoing process. Generally, the factors that influence this frequency are the stability of demand, the rate of technological change in equipment and product design, and competitive factors. Other factors relate to the type of product or service and whether style changes are important (e.g., automobiles and clothing). In any case, man- agement must review product and service choices periodically to ensure that the com- pany makes capacity changes when they are needed for cost, competitive effectiveness, or other reasons.

In the airline industry, air travel is way down, leaving airline companies awash in capacity. And even much of the currently mothballed aircraft are only in storage. Companies have eliminated flights to save money and cut prices to the bone trying to lure passengers.

The auto producers don’t have it quite so bad, but for years they’ve been offering their customers incentives and interest-free financing—in order to keep their excess plants running.

Today, huge gaps between supply and demand have many compa- nies struggling. Excess capacity abounds in such major industries as telecom, airline, and auto manufacturing. The bad news is that some companies are losing millions of dollars a year because of this. In the telecom industry, the increasing reach of cellular technology and other kinds of wireless access is continuing to create more and more sup- ply, requiring telecom companies to cut prices and offer incentives to increase demand.

READING Excess Capacity Can Be Bad News!

are only in storage

n, ,,, d

LO5.1 Name the three key questions in capacity planning

ste24102_ch05_184-215.indd 186ste24102_ch05_184-215.indd 186 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

Chapter Five Strategic Capacity Planning for Products and Services 187

5.2 CAPACITY DECISIONS ARE STRATEGIC For a number of reasons, capacity decisions are among the most fundamental of all the design decisions that managers must make. In fact, capacity decisions can be critical for an organization:

1. Capacity decisions have a real impact on the ability of the organization to meet future demands for products and services; capacity essentially limits the rate of output pos- sible. Having capacity to satisfy demand can often allow a company to take advantage of tremendous benefits. When Microsoft introduced its new Xbox in late 2005, there were insufficient supplies, resulting in lost sales and unhappy customers. And shortages of flu vaccine in some years due to production problems affected capacity, limiting the availabil- ity of the vaccine.

2. Capacity decisions affect operating costs. Ideally, capacity and demand requirements will be matched, which will tend to minimize operating costs. In practice, this is not always achieved because actual demand either differs from expected demand or tends to vary (e.g., cyclically). In such cases, a decision might be made to attempt to balance the costs of over- and undercapacity.

3. Capacity is usually a major determinant of initial cost. Typically, the greater the capacity of a productive unit, the greater its cost. This does not necessarily imply a one-for-one relationship; larger units tend to cost proportionately less than smaller units.

4. Capacity decisions often involve long-term commitment of resources and the fact that, once they are implemented, those decisions may be difficult or impossible to modify without incurring major costs.

5. Capacity decisions can affect competitiveness. If a firm has excess capacity, or can quickly add capacity, that fact may serve as a barrier to entry by other firms. Then too, capacity can affect delivery speed, which can be a competitive advantage.

6. Capacity affects the ease of management; having appropriate capacity makes manage- ment easier than when capacity is mismatched.

7. Globalization has increased the importance and the complexity of capacity decisions. Far-flung supply chains and distant markets add to the uncertainty about capacity needs.

8. Because capacity decisions often involve substantial financial and other resources, it is necessary to plan for them far in advance. For example, it may take years for a new power-generating plant to be constructed and become operational. However, this increases the risk that the designated amount of capacity will not match actual demand when the capacity becomes available.

LO5.2 Explain the importance of capacity planning.

ste24102_ch05_184-215.indd 187ste24102_ch05_184-215.indd 187 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

188 Chapter Five Strategic Capacity Planning for Products and Services

5.3 DEFINING AND MEASURING CAPACITY Capacity often refers to an upper limit on the rate of output. Even though this seems simple enough, there are subtle difficulties in actually measuring capacity in certain cases. These difficulties arise because of different interpretations of the term capacity and problems with identifying suitable measures for a specific situation.

In selecting a measure of capacity, it is important to choose one that does not require updating. For example, dollar amounts are often a poor measure of capacity (e.g., capacity of $30 million a year) because price changes necessitate updating of that measure.

Where only one product or service is involved, the capacity of the productive unit may be expressed in terms of that item. However, when multiple products or services are involved, as is often the case, using a simple measure of capacity based on units of output can be mislead- ing. An appliance manufacturer may produce both refrigerators and freezers. If the output rates for these two products are different, it would not make sense to simply state capacity in units without reference to either refrigerators or freezers. The problem is compounded if the firm has other products. One possible solution is to state capacities in terms of each prod- uct. Thus, the firm may be able to produce 100 refrigerators per day or 80 freezers per day. Sometimes this approach is helpful, sometimes not. For instance, if an organization has many different products or services, it may not be practical to list all of the relevant capacities. This is especially true if there are frequent changes in the mix of output, because this would neces- sitate a frequently changing composite index of capacity. The preferred alternative in such cases is to use a measure of capacity that refers to availability of inputs. Thus, a hospital has a certain number of beds, a factory has a certain number of machine hours available, and a bus has a certain number of seats and a certain amount of standing room.

No single measure of capacity will be appropriate in every situation. Rather, the measure of capacity must be tailored to the situation. Table 5.1 provides some examples of commonly used measures of capacity.

Up to this point, we have been using a general definition of capacity. Although it is func- tional, it can be refined into two useful definitions of capacity:

1. Design capacity : The maximum output rate or service capacity an operation, process, or facility is designed for.

2. Effective capacity : Design capacity minus allowances such as personal time, and maintenance.

Design capacity is the maximum rate of output achieved under ideal conditions. Effective capacity is always less than design capacity owing to realities of changing product mix, the need for periodic maintenance of equipment, lunch breaks, coffee breaks, problems in schedul- ing and balancing operations, and similar circumstances. Actual output cannot exceed effective capacity and is often less because of machine breakdowns, absenteeism, shortages of materials, and quality problems, as well as factors that are outside the control of the operations managers.

Design capacity  The maxi- mum designed service capacity or output rate.

Effective capacity  Design capacity minus allowances such as personal time, equipment maintenance, delays due to scheduling problems, and changing the mix of products.

LO5.3 Describe ways of defining and measuring capacity.

TABLE 5.1 Measures of capacity Business Inputs Outputs

Auto manufacturing Labor hours, machine hours Number of cars per shift Steel mill Furnace size Tons of steel per day Oil refinery Refinery size Gallons of fuel per day Farming Number of acres, number

of cows Bushels of grain per acre per year,

gallons of milk per day Restaurant Number of tables, seating capacity Number of meals served per day Theater Number of seats Number of tickets sold per

performance Retail sales Square feet of floor space Revenue generated per day

ste24102_ch05_184-215.indd 188ste24102_ch05_184-215.indd 188 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

Chapter Five Strategic Capacity Planning for Products and Services 189

These different measures of capacity are useful in defining two measures of system effec- tiveness: efficiency and utilization. Efficiency is the ratio of actual output to effective capacity. Capacity utilization is the ratio of actual output to design capacity.

Efficiency Actual output

Effective capacity 100%� � (5–1)

Utilization Actual output

Design capacity 100%� � (5–2)

Both measures are expressed as percentages. It is not unusual for managers to focus exclusively on efficiency, but in many instances this

emphasis can be misleading. This happens when effective capacity is low compared to design capacity. In those cases, high efficiency would seem to indicate effective use of resources when it does not. The following example illustrates this point.

Given the following information, compute the efficiency and the utilization of the vehicle repair department:

Design capacity 50 trucks per day

Effective capacity 40 trucks per day

Actual output 36 trucks per day

E X A M P L E 1 e celx

mhhe.com/stevenson12e

S O L U T I O N Efficiency

Actual output

Effective capacity 100%

36 trucks per day

40 trucks per day 100% 90%

Utilization Actual output

Design capacity 100%

36 trucks per day

50 trucks per day 100% 72%

� � � � �

� � � � �

Compared to the effective capacity of 40 units per day, 36 units per day looks pretty good. However, compared to the design capacity of 50 units per day, 36 units per day is much less impressive although probably more meaningful.

Because effective capacity acts as a lid on actual output, the real key to improving capacity utilization is to increase effective capacity by correcting quality problems, maintaining equip- ment in good operating condition, fully training employees, and fully utilizing bottleneck equipment.

Hence, increasing utilization depends on being able to increase effective capacity, and this requires a knowledge of what is constraining effective capacity.

The following section explores some of the main determinants of effective capacity. It is important to recognize that the benefits of high utilization are realized only in instances where there is demand for the output. When demand is not there, focusing exclusively on utilization can be counterproductive, because the excess output not only results in additional variable costs but also generates the costs of having to carry the output as inventory. Another disadvan- tage of high utilization is that operating costs may increase because of increasing waiting time due to bottleneck conditions.

5.4 DETERMINANTS OF EFFECTIVE CAPACITY Many decisions about system design have an impact on capacity. The same is true for many operating decisions. This section briefly describes some of these factors, which are then elab- orated on elsewhere in the book. The main factors relate to facilities, products or services, processes, human considerations, operational factors, the supply chain, and external forces.

ste24102_ch05_184-215.indd 189ste24102_ch05_184-215.indd 189 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

190 Chapter Five Strategic Capacity Planning for Products and Services

Facilities. The design of facilities, including size and provision for expansion, is key. Loca- tional factors, such as transportation costs, distance to market, labor supply, energy sources, and room for expansion, are also important. Likewise, layout of the work area often deter- mines how smoothly work can be performed, and environmental factors such as heating, lighting, and ventilation also play a significant role in determining whether personnel can perform effectively or whether they must struggle to overcome poor design characteristics.

Product and Service Factors. Product or service design can have a tremendous influ- ence on capacity. For example, when items are similar, the ability of the system to produce those items is generally much greater than when successive items differ. Thus, a restaurant that offers a limited menu can usually prepare and serve meals at a faster rate than a restaurant with an extensive menu. Generally speaking, the more uniform the output, the more opportu- nities there are for standardization of methods and materials, which leads to greater capacity. The particular mix of products or services rendered also must be considered since different items will have different rates of output.

LO5.4 Name several determi- nants of effective capacity.

In only 48 hours Solectron in San Jose, California, can build to order, ship, and install a complex computer system. Suppliers hold inventory until it is pulled, thereby increasing manufacturing flexibility.

Making a violin requires precision and skill from an artisan. Capacity is highly limited when items are specialized and produced one at a time.

Process Factors. The quantity capability of a process is an obvious determinant of capac- ity. A more subtle determinant is the influence of output quality. For instance, if quality of output does not meet standards, the rate of output will be slowed by the need for inspection and rework activities. Productivity also affects capacity. Process improvements that increase quality and productivity can result in increased capacity. Also, if multiple products or multiple services are processed in batches, the time to change over equipment settings must be taken into account.

Human Factors. The tasks that make up a job, the variety of activities involved, and the training, skill, and experience required to perform a job all have an impact on the potential and actual output. In addition, employee motivation has a very basic relationship to capacity, as do absenteeism and labor turnover.

ste24102_ch05_184-215.indd 190ste24102_ch05_184-215.indd 190 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

Chapter Five Strategic Capacity Planning for Products and Services 191

Policy Factors. Management policy can affect capacity by allowing or not allowing capac- ity options such as overtime or second or third shifts.

Operational Factors. Scheduling problems may occur when an organization has differ- ences in equipment capabilities among alternative pieces of equipment or differences in job requirements. Inventory stocking decisions, late deliveries, purchasing requirements, accept- ability of purchased materials and parts, and quality inspection and control procedures also can have an impact on effective capacity.

Inventory shortages of even one component of an assembled item (e.g., computers, refrig- erators, automobiles) can cause a temporary halt to assembly operations until the compo- nents become available. This can have a major impact on effective capacity. Thus, insufficient capacity in one area can affect overall capacity.

Supply Chain Factors. Supply chain factors must be taken into account in capacity plan- ning if substantial capacity changes are involved. Key questions include: What impact will the changes have on suppliers, warehousing, transportation, and distributors? If capacity will be increased, will these elements of the supply chain be able to handle the increase? Conversely, if capacity is to be decreased, what impact will the loss of business have on these elements of the supply chain?

External Factors. Product standards, especially minimum quality and performance stan- dards, can restrict management’s options for increasing and using capacity. Thus, pollution standards on products and equipment often reduce effective capacity, as does paperwork required by government regulatory agencies by engaging employees in nonproductive activi- ties. A similar effect occurs when a union contract limits the number of hours and type of work an employee may do.

Table 5.2 summarizes these factors. In addition, inadequate planning can be a major limit- ing determinant of effective capacity.

5.5 STRATEGY FORMULATION The three primary strategies are leading, following, and tracking. A leading capacity strategy builds capacity in anticipation of future demand increases. If capacity increases involve a long lead time, this strategy may be the best option. A following strategy builds capacity when demand exceeds current capacity. A tracking strategy is similar to a following strategy, but it adds capacity in relatively small increments to keep pace with increasing demand.

A. Facilities 1. Design 2. Location 3. Layout 4. Environment B. Product/service 1. Design 2. Product or service mix C. Process 1. Quantity capabilities 2. Quality capabilities D. Human factors 1. Job content 2. Job design 3. Training and experience 4. Motivation

5. Compensation 6. Learning rates 7. Absenteeism and labor turnover E. Policy F. Operational 1. Scheduling 2. Materials management 3. Quality assurance 4. Maintenance policies 5. Equipment breakdowns G. Supply chain H. External factors 1. Product standards 2. Safety regulations 3. Unions 4. Pollution control standards

TABLE 5.2 Factors that determine effective capacity

ste24102_ch05_184-215.indd 191ste24102_ch05_184-215.indd 191 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

192 Chapter Five Strategic Capacity Planning for Products and Services

An organization typically bases its capacity strategy on assumptions and predictions about long-term demand patterns, technological changes, and the behavior of its competitors. These typically involve (1) the growth rate and variability of demand, (2) the costs of building and operating facilities of various sizes, (3) the rate and direction of technological innovation, (4) the likely behavior of competitors, and (5) availability of capital and other inputs.

In some instances a decision may be made to incorporate a capacity cushion , which is an amount of capacity in excess of expected demand when there is some uncertainty about demand. Capacity cushion  �  capacity  �  expected demand. Typically, the greater the degree of demand uncertainty, the greater the amount of cushion used. Organizations that have stan- dard products or services generally have smaller capacity cushions. Cost and competitive priorities are also key factors.

Steps in the Capacity Planning Process

1. Estimate future capacity requirements.

2. Evaluate existing capacity and facilities and identify gaps.

3. Identify alternatives for meeting requirements.

4. Conduct financial analyses of each alternative.

5. Assess key qualitative issues for each alternative.

6. Select the alternative to pursue that will be best in the long term.

7. Implement the selected alternative.

8. Monitor results.

Capacity planning can be difficult at times due to the complex influence of market forces and technology.

5.6 FORECASTING CAPACITY REQUIREMENTS Capacity planning decisions involve both long-term and short-term considerations. Long- term considerations relate to overall level of capacity, such as facility size; short-term con- siderations relate to probable variations in capacity requirements created by such things as seasonal, random, and irregular fluctuations in demand. Because the time intervals covered by each of these categories can vary significantly from industry to industry, it would be mislead- ing to put times on the intervals. However, the distinction will serve as a framework within which to discuss capacity planning.

Long-term capacity needs require forecasting demand over a time horizon and then con- verting those forecasts into capacity requirements. Figure 5.1 illustrates some basic demand patterns that might be identified by a forecast. In addition to basic patterns there are more complex patterns, such as a combination of cycles and trends.

When trends are identified, the fundamental issues are (1) how long the trend might per- sist, because few things last forever, and (2) the slope of the trend. If cycles are identified, interest focuses on (1) the approximate length of the cycles and (2) the amplitude of the cycles (i.e., deviation from average).

Short-term capacity needs are less concerned with cycles or trends than with seasonal vari- ations and other variations from average. These deviations are particularly important because they can place a severe strain on a system’s ability to satisfy demand at some times and yet result in idle capacity at other times.

An organization can identify seasonal patterns using standard forecasting techniques. Although commonly thought of as annual fluctuations, seasonal variations are also reflected in monthly, weekly, and even daily capacity requirements. Table 5.3 provides some examples of items that tend to exhibit seasonal demand patterns.

When time intervals are too short to have seasonal variations in demand, the analysis can often describe the variations by probability distributions such as a normal, uniform, or Poisson

Capacity cushion  Extra capacity used to offset demand uncertainty.

ste24102_ch05_184-215.indd 192ste24102_ch05_184-215.indd 192 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

Chapter Five Strategic Capacity Planning for Products and Services 193

distribution. For example, we might describe the amount of coffee served during the midday meal at a luncheonette by a normal distribution with a certain mean and standard deviation. The number of customers who enter a bank branch on Monday mornings might be described by a Poisson distribution with a certain mean. It does not follow, however, that every instance of random variability will lend itself to description by a standard statistical distribution. Ser- vice systems in particular may experience a considerable amount of variability in capacity requirements unless requests for service can be scheduled. Manufacturing systems, because of their typical isolation from customers and the more uniform nature of production, are likely to experience fewer variations. Waiting-line models and simulation models can be useful when analyzing service systems. These models are described in Chapter 18.

Irregular variations are perhaps the most troublesome: They are difficult or impossible to predict. They are created by such diverse forces as major equipment breakdowns, freak storms that disrupt normal routines, foreign political turmoil that causes oil shortages, discov- ery of health hazards (nuclear accidents, unsafe chemical dumping grounds, carcinogens in food and drink), and so on.

The link between marketing and operations is crucial to realistic determination of capacity requirements. Through customer contracts, demographic analyses, and forecasts, marketing can supply vital information to operations for ascertaining capacity needs for both the long term and the short term.

Calculating Processing Requirements A necessary piece of information is the capacity requirements of products that will be pro- cessed. To get this information, one must have reasonably accurate demand forecasts for each product and know the standard processing time per unit for each product, the number of work- days per year, and the number of shifts that will be used.

FIGURE 5.1 Common demand patterns

Time

Time

Time

Time V

o lu

m e

V o

lu m

e

V o

lu m

e V

o lu

m e

0

0

0

0

Growth Decline

Cyclical Stable

TABLE 5.3 Examples of seasonal demand patterns

Period Items

Year Beer sales, toy sales, airline traffic, clothing, vacations, tourism, power usage, gasoline consumption, sports and recreation, education

Month Welfare and social security checks, bank transactions Week Retail sales, restaurant meals, automobile traffic, automotive rentals, hotel registrations Day Telephone calls, power usage, automobile traffic, public transportation, classroom

utilization, retail sales, restaurant meals

ste24102_ch05_184-215.indd 193ste24102_ch05_184-215.indd 193 11/28/13 11:38 PM11/28/13 11:38 PM

Final PDF to printer

194 Chapter Five Strategic Capacity Planning for Products and Services

The task of determining capacity requirements should not be taken lightly. Substantial losses can occur when there are misjudgments on capacity needs. One key reason for those misjudg- ments can be overly optimistic projections of demand and growth. Marketing personnel are gen- erally optimistic in their outlook, which isn’t necessarily a bad thing. But care must be taken so that that optimism doesn’t lead to overcapacity, because the resulting underutilized capacity will create an additional cost burden. Another key reason for misjudgments may be focusing exclu- sively on sales and revenue potential, and not taking into account the product mix that will be needed to generate those sales and revenues. To avoid that, marketing and operations personnel must work closely to determine the optimal product mix needed and the resulting cost and profit.

A reasonable approach to determining capacity requirements is to obtain a forecast of future demand, translate demand into both the quantity and the timing of capacity requirements, and then decide what capacity changes (increased, decreased, or no changes) are needed.

Long-term capacity alternatives include expansion or contraction of an existing facility, opening or closing branch facilities, and relocation of existing operations. At this point, a decision must be made on whether to make or buy a good, or provide or buy a service.

5.7 ADDITIONAL CHALLENGES OF PLANNING SERVICE CAPACITY

While the foregoing discussion relates generally to capacity planning for both goods and ser- vices, it is important to note that capacity planning for services can present special challenges due to the nature of services. Three very important factors in planning service capacity are (1) there may be a need to be near customers, (2) the inability to store services, and (3) the degree of volatility of demand.

Convenience for customers is often an important aspect of service. Generally, a service must be located near customers. For example, hotel rooms must be where customers want to stay; having a vacant room in another city won’t help. Thus, capacity and location are closely tied.

Capacity also must be matched with the timing of demand. Unlike goods, services can- not be produced in one period and stored for use in a later period. Thus, an unsold seat on an airplane, train, or bus cannot be stored for use on a later trip. Similarly, inventories of goods allow customers to immediately satisfy wants, whereas a customer who wants a service may have to wait. This can result in a variety of negatives for an organization that provides the ser- vice. Thus, speed of delivery, or customer waiting time, becomes a major concern in service capacity planning. For example, deciding on the number of police officers and fire trucks to

A department works one 8-hour shift, 250 days a year, and has these figures for usage of a machine that is currently being considered:

Product Annual

Demand Standard Processing

Time per Unit (hr) Processing Time

Needed (hr)

1 400 5.0 2,000 2 300 8.0 2,400 3 700 2.0 1,400

5,800

Units of capacity needed

Processing time needed

Processing time capacity per unit �

(5–3)

Working one 8-hour shift 250 days a year provides an annual capacity of 8  �  250  �  2,000 hours per year. Consequently, three of these machines would be needed to handle the required volume:

5,800 hours

2,000 hours/machine 2.90 machines�

E X A M P L E 2 e celx

mhhe.com/stevenson12e

ste24102_ch05_184-215.indd 194ste24102_ch05_184-215.indd 194 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

Chapter Five Strategic Capacity Planning for Products and Services 195

have on duty at any given time affects the speed of response and brings into issue the cost of maintaining that capacity. Some of these issues are addressed in the chapter on waiting lines.

Demand volatility presents problems for capacity planners. Demand volatility tends to be higher for services than for goods, not only in timing of demand, but also in the amount of time required to service individual customers. For example, banks tend to experience higher volumes of demand on certain days of the week, and the number and nature of transactions tend to vary substantially for different individuals. Then, too, a wide range of social, cultural, and even weather factors can cause major peaks and valleys in demand. The fact that services can’t be stored means service systems cannot turn to inventory to smooth demand require- ments on the system the way goods-producing systems are able to. Instead, service planners have to devise other methods of coping with demand volatility and cyclical demand. For example, to cope with peak demand periods, planners might consider hiring extra workers, hiring temporary workers, outsourcing some or all of a service, or using pricing and promo- tion to shift some demand to slower periods.

In some instances, demand management strategies can be used to offset capacity limita- tions. Pricing, promotions, discounts, and similar tactics can help to shift some demand away from peak periods and into slow periods, allowing organizations to achieve a closer match in supply and demand.

5.8 DO IT IN-HOUSE OR OUTSOURCE IT? Once capacity requirements have been determined, the organization must decide whether to pro- duce a good or provide a service itself, or to outsource from another organization. Many organi- zations buy parts or contract out services, for a variety of reasons. Among those factors are

1. Available capacity. If an organization has available the equipment, necessary skills, and time, it often makes sense to produce an item or perform a service in-house. The addi- tional costs would be relatively small compared with those required to buy items or sub- contract services. On the other hand, outsourcing can increase capacity and flexibility.

2. Expertise. If a firm lacks the expertise to do a job satisfactorily, buying might be a rea- sonable alternative.

3. Quality considerations. Firms that specialize can usually offer higher quality than an organization can attain itself. Conversely, unique quality requirements or the desire to closely monitor quality may cause an organization to perform a job itself.

4. The nature of demand. When demand for an item is high and steady, the organization is often better off doing the work itself. However, wide fluctuations in demand or small orders are usually better handled by specialists who are able to combine orders from multiple sources, which results in higher volume and tends to offset individual buyer fluctuations.

5. Cost. Any cost savings achieved from buying or making must be weighed against the preceding factors. Cost savings might come from the item itself or from transportation cost savings. If there are fixed costs associated with making an item that cannot be real- located if the service or product is outsourced, that has to be recognized in the analysis. Conversely, outsourcing may help a firm avoid incurring fixed costs.

6. Risks. Buying goods or services may entail considerable risks. Loss of direct control over operations, knowledge sharing, and the possible need to disclose proprietary infor- mation are three risks. And liability can be a tremendous risk if the products or services of other companies cause harm to customers or the environment, as well as damage to an organization’s reputation. Reputation can also be damaged if the public discovers that a supplier operates with substandard working conditions.

In some cases, a firm might choose to perform part of the work itself and let others handle the rest in order to maintain flexibility and to hedge against loss of a subcontractor. If part or all of the work will be done in-house, capacity alternatives will need to be developed.

LO5.5 Discuss factors to con- sider when deciding whether to operate in-house or outsource.

ste24102_ch05_184-215.indd 195ste24102_ch05_184-215.indd 195 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

196 Chapter Five Strategic Capacity Planning for Products and Services

Outsourcing brings with it a host of supply chain considerations. These are described in Chapter 15.

The following reading describes outsourcing that might surprise you.

magazines abound, with taglines such as “Hours versus ours” and “Just heat and serve.”

Not exactly like mother used to make, but then mother never had to contend with labor costs that run about 30 percent of revenue, or worry about keeping up with the competition.

Questions

1. Explain the meaning of the phrase “Hours versus ours.” 2. What advantages are there when restaurants outsource? 3. What are some important disadvantages or limitations of outsourc-

ing for restaurants? 4. Do you consider restaurant outsourcing to be dishonest? Unethical?

Explain. 5. Does restaurant outsourcing increase capacity? Explain.

Ever wonder how some sit-down restaurants are able to offer a huge variety of menu items, and how they are able to serve everything on that menu quickly? Could they have humongous kitchens and a bat- tery of chefs scurrying around? Or maybe a few amazing chefs whose hands are almost quicker than the eye? Maybe, and maybe not. In fact, that great-tasting restaurant entrée or dessert you are served might have been prepared in a distant kitchen, where it was partially cooked, then flash-frozen or vacuum-packed, and shipped to your restaurant, awaiting your order. Then the entrée was finished cook- ing, perhaps in a microwave oven, and soon it was served to you— fresh made, so to speak. Surprised? Don’t be. Many restaurants, from chains like Fuddruckers and Perkins, to top-quality restaurants, are going the outsourcing route. And companies such as Sara Lee, Land O’ Lakes, and Stockpot Soup Company of Redwood, Washington, are only too happy to oblige them. Advertisements in restaurant trade

READING My Compliments to the Chef, er, Buyer

mother never had to

rsss

LO5.6 Discuss the major considerations related to devel- oping capacity alternatives.

5.9 DEVELOPING CAPACITY STRATEGIES There are a number of ways to enhance development of capacity strategies:

1. Design flexibility into systems. The long-term nature of many capacity decisions and the risks inherent in long-term forecasts suggest potential benefits from designing flexible systems. For example, provision for future expansion in the original design of a structure fre- quently can be obtained at a small price compared to what it would cost to remodel an existing structure that did not have such a provision. Hence, if future expansion of a restaurant seems likely, water lines, power hookups, and waste disposal lines can be put in place initially so that if expansion becomes a reality, modification to the existing structure can be minimized. Similarly, a new golf course may start as a 9-hole operation, but if provision is made for future expansion by obtaining options on adjacent land, it may progress to a larger (18-hole) course. Other considerations in flexible design involve layout of equipment, location, equipment selection, production planning, scheduling, and inventory policies, which will be discussed in later chapters.

2. Take stage of life cycle into account. Capacity requirements are often closely linked to the stage of the life cycle that a product or service is in. At the introduction phase, it can be difficult to determine both the size of the market and the organization’s eventual share of that market. Therefore, organizations should be cautious in making large and/or inflexible capac- ity investments.

In the growth phase, the overall market may experience rapid growth. However, the real issue is the rate at which the organization’s market share grows, which may be more or less than the market rate, depending on the success of the organization’s strategies. Organiza- tions generally regard growth as a good thing. They want growth in the overall market for their products or services, and in their share of the market, because they see this as a way of increasing volume, and thus, increasing profits. However, there can also be a downside to this because increasing output levels will require increasing capacity, and that means increasing investment and increasing complexity. In addition, decision makers should take into account

ste24102_ch05_184-215.indd 196ste24102_ch05_184-215.indd 196 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

Chapter Five Strategic Capacity Planning for Products and Services 197

possible similar moves by competitors, which would increase the risk of overcapacity in the market, and result in higher unit costs of the output. Another strategy would be to compete on some nonprice attribute of the product by investing in technology and process improvements to make differentiation a competitive advantage.

In the maturity phase, the size of the market levels off, and organizations tend to have stable market shares. Organizations may still be able to increase profitability by reducing costs and making full use of capacity. However, some organizations may still try to increase profitability by increasing capacity if they believe this stage will be fairly long, or the cost to increase capacity is relatively small.

In the decline phase, an organization is faced with underutilization of capacity due to declining demand. Organizations may eliminate the excess capacity by selling it, or by intro- ducing new products or services. An option that is sometimes used in manufacturing is to transfer capacity to a location that has lower labor costs, which allows the organization to continue to make a profit on the product for a while longer.

3. Take a “big-picture” (i.e., systems) approach to capacity changes. When develop- ing capacity alternatives, it is important to consider how parts of the system interrelate. For example, when making a decision to increase the number of rooms in a motel, one should also take into account probable increased demands for parking, entertainment and food, and housekeeping. Also, will suppliers be able to handle the increased volume?

Capacity changes inevitably affect an organization’s supply chain. Suppliers may need time to adjust to their capacity, so collaborating with supply chain partners on plans for capacity increases is essential. That includes not only suppliers, but also distributors and transporters.

The risk in not taking a big-picture approach is that the system will be unbalanced. Evidence of an unbalanced system is the existence of a bottleneck operation. A bottleneck operation is an operation in a sequence of operations whose capacity is lower than the capacities of other operations in the sequence. As a consequence, the capacity of the bottleneck operation limits the system capacity; the capacity of the system is reduced to the capacity of the bottleneck operation. Figure 5.2 illustrates this concept: Four operations generate work that must then be processed by a fifth operation. The four different operations each have a capacity of 10 units per hour, for a total capacity of 40 units per hour. However, the fifth operation can only pro- cess 30 units per hour. Consequently, the output of the system will only be 30 units per hour. If the other operations operate at capacity, a line of units waiting to be processed by the bottle- neck operation will build up at the rate of 10 per hour.

Here is another example. The following diagram illustrates a three-step process, with capacities of each step shown. However, the middle process, because its capacity is lower than that of the others, constrains the system to its capacity of 10 units per hour. Hence it is a bottleneck. In order to increase the capacity of the entire process, it would be necessary to increase the capacity of this bottleneck operation. Note, though, that the potential for increas- ing the capacity of the process is only 5 units, to 15 units per hour. Beyond that, operation 3’s capacity would limit process capacity to 15 units per hour.

Bottleneck operation  An operation in a sequence of opera- tions whose capacity is lower than that of the other operations.

FIGURE 5.2 Bottleneck operation

Operation 1

Operation 2

Bottleneck operation

30/hr

10/hr

10/hr

10/hr

10/hr

Operation 3

Operation 4

ste24102_ch05_184-215.indd 197ste24102_ch05_184-215.indd 197 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

198 Chapter Five Strategic Capacity Planning for Products and Services

4. Prepare to deal with capacity “chunks.” Capacity increases are often acquired in fairly large chunks rather than smooth increments, making it difficult to achieve a match between desired capacity and feasible capacity. For instance, the desired capacity of a certain operation may be 55 units per hour, but suppose that machines used for this operation are able to produce 40 units per hour each. One machine by itself would cause capacity to be 15 units per hour short of what is needed, but two machines would result in an excess capacity of 25 units per hour. The illustration becomes even more extreme if we shift the topic—to open- hearth furnaces or to the number of airplanes needed to provide a desired level of capacity.

5. Attempt to smooth out capacity requirements. Unevenness in capacity requirements also can create certain problems. For instance, during periods of inclement weather, public transportation ridership tends to increase substantially relative to periods of pleasant weather. Consequently, the system tends to alternate between underutilization and overutilization. Increasing the number of buses or subway cars will reduce the burden during periods of heavy demand, but this will aggravate the problem of overcapacity at other times and certainly add to the cost of operating the system.

We can trace the unevenness in demand for products and services to a variety of sources. The bus ridership problem is weather related to a certain extent, but demand could be consid- ered to be partly random (i.e., varying because of chance factors). Still another source of vary- ing demand is seasonality. Seasonal variations are generally easier to cope with than random variations because they are predictable. Consequently, management can make allowances in planning and scheduling activities and inventories. However, seasonal variations can still pose problems because of their uneven demands on the system: At certain times the system

Operation 1 Operation 2 Operation 3

20/hr 10/hr 15/hr

10/hr

Capacity requirements are affected by seasonal variations. One approach is to identify products that offset each other such as demand for water skis and demand for snow skis.

ste24102_ch05_184-215.indd 198ste24102_ch05_184-215.indd 198 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

Chapter Five Strategic Capacity Planning for Products and Services 199

will tend to be overloaded, while at other times it will tend to be underloaded. One possible approach to this problem is to identify products or services that have complementary demand patterns, that is, patterns that tend to offset each other. For instance, demand for snow skis and demand for water skis might complement each other: Demand for water skis is greater in the spring and summer months, and demand for snow skis is greater in the fall and winter months. The same might apply to heating and air-conditioning equipment. The ideal case is one in which products or services with complementary demand patterns involve the use of the same resources but at different times, so that overall capacity requirements remain fairly stable and inventory levels are minimized. Figure 5.3 illustrates complementary demand patterns.

Variability in demand can pose a problem for managers. Simply adding capacity by increasing the size of the operation (e.g., increasing the size of the facility, the workforce, or the amount of processing equipment) is not always the best approach, because that reduces flexibility and adds to fixed costs. Consequently, managers often choose to respond to higher than normal demand in other ways. One way is through the use of overtime work. Another way is to subcontract some of the work. A third way is to draw down finished goods invento- ries during periods of high demand and replenish them during periods of slow demand. These options and others are discussed in detail in the chapter on aggregate planning.

6. Identify the optimal operating level. Production units typically have an ideal or optimal level of operation in terms of unit cost of output. At the ideal level, cost per unit is the lowest for that production unit. If the output rate is less than the optimal level, increas- ing the output rate will result in decreasing average unit costs. This is known as economies of scale . However, if output is increased beyond the optimal level, average unit costs will become increasingly larger. This is known as diseconomies of scale . Figure 5.4 illustrates these concepts.

Economies of scale  If the out- put rate is less than the optimal level, increasing the output rate results in decreasing average unit costs.

Diseconomies of scale  If the output rate is more than the opti- mal level, increasing the output rate results in increasing average unit costs.

FIGURE 5.3 A and B have complementary demand patterns

Time

D em

an d

0

A + B

A

B

FIGURE 5.4 Production units have an optimal rate of output for minimum cost

A ve

ra g

e co

st p

er u

n it

0 Rate of output

Minimum cost

Optimal rate

ste24102_ch05_184-215.indd 199ste24102_ch05_184-215.indd 199 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

200 Chapter Five Strategic Capacity Planning for Products and Services

Reasons for economies of scale include the following:

a. Fixed costs are spread over more units, reducing the fixed cost per unit.

b. Construction costs increase at a decreasing rate with respect to the size of the facility to be built.

c. Processing costs decrease as output rates increase because operations become more standardized, which reduces unit costs.

Reasons for diseconomies of scale include the following:

a. Distribution costs increase due to traffic congestion and shipping from one large centralized facility instead of several smaller, decentralized facilities.

b. Complexity increases costs; control and communication become more problematic.

c. Inflexibility can be an issue.

d. Additional levels of bureaucracy exist, slowing decision making and approvals for changes.

The explanation for the shape of the cost curve is that at low levels of output, the costs of facilities and equipment must be absorbed (paid for) by very few units. Hence, the cost per unit is high. As output is increased, there are more units to absorb the “fixed” cost of facilities and equipment, so unit costs decrease. However, beyond a certain point, unit costs will start to rise. To be sure, the fixed costs are spread over even more units, so that does not account for the increase, but other factors now become important: worker fatigue; equipment break- downs; the loss of flexibility, which leaves less of a margin for error; and, generally, greater difficulty in coordinating operations.

Both optimal operating rate and the amount of the minimum cost tend to be a func- tion of the general capacity of the operating unit. For example, as the general capacity of a plant increases, the optimal output rate increases and the minimum cost for the optimal rate decreases. Thus, larger plants tend to have higher optimal output rates and lower minimum costs than smaller plants. Figure 5.5 illustrates these points.

In choosing the capacity of an operating unit, management must take these relationships into account along with the availability of financial and other resources and forecasts of expected demand. To do this, it is necessary to determine enough points for each size facility to be able to make a comparison among different sizes. In some instances, facility sizes are givens, whereas in others, facility size is a continuous variable (i.e., any size can be selected). In the latter case, an ideal facility size can be selected. Usually, management must make a choice from given sizes, and none may have a minimum at the desired rate of output.

7. Choose a strategy if expansion is involved. Consider whether incremental expansion or single step is more appropriate. Factors include competitive pressures, market opportuni- ties, costs and availability of funds, disruption of operations, and training requirements. Also, decide whether to lead or follow competitors. Leading is more risky, but it may have greater potential for rewards.

FIGURE 5.5 Minimum cost and optimal operating rate are functions of size of a production unit

Output rate

A ve

ra g

e co

st p

er u

n it

0

Small plant

Medium plant

Large plant

ste24102_ch05_184-215.indd 200ste24102_ch05_184-215.indd 200 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

Chapter Five Strategic Capacity Planning for Products and Services 201

5.10 CONSTRAINT MANAGEMENT A constraint is something that limits the performance of a process or system in achieving its goals. Constraint management is often based on the work of Eli Goldratt ( The Theory of Constraints ), and Eli Schragenheim and H. William Dettmer ( Manufacturing at Warp Speed ). There are seven categories of constraints:

Market: Insufficient demand.

Resource: Too little of one or more resources (e.g., workers, equipment, and space), as illustrated in Figure 5.2 .

Material: Too little of one or more materials.

Financial: Insufficient funds.

Supplier: Unreliable, long lead time, substandard quality.

Knowledge or competency: Needed knowledge or skills missing or incomplete.

Policy: Laws or regulations interfere.

There may only be a few constraints, or there may be more than a few. Constraint issues can be resolved by using the following five steps: 1

1. Identify the most pressing constraint. If it can easily be overcome, do so, and return to Step 1 for the next constraint. Otherwise, proceed to Step 2.

2. Change the operation to achieve the maximum benefit, given the constraint. This may be a short-term solution.

3. Make sure other portions of the process are supportive of the constraint (e.g., bottleneck operation).

4. Explore and evaluate ways to overcome the constraint. This will depend on the type of constraint. For example, if demand is too low, advertising or price change may be an option. If capacity is the issue, working overtime, purchasing new equipment, and out- sourcing are possible options. If additional funds are needed, working to improve cash flow, borrowing, and issuing stocks or bonds may be options. If suppliers are a problem, work with them, find more desirable suppliers, or insource. If knowledge or skills are needed, seek training or consultants, or outsource. If laws or regulations are the issue, working with lawmakers or regulators may be an option.

5. Repeat the process until the level of constraints is acceptable.

5.11 EVALUATING ALTERNATIVES An organization needs to examine alternatives for future capacity from a number of different perspectives. Most obvious are economic considerations: Will an alternative be economically feasible? How much will it cost? How soon can we have it? What will operating and mainte- nance costs be? What will its useful life be? Will it be compatible with present personnel and present operations?

Less obvious, but nonetheless important, is possible negative public opinion. For instance, the decision to build a new power plant is almost sure to stir up reaction, whether the plant is coal-fired, hydroelectric, or nuclear. Any option that could disrupt lives and property is bound to generate hostile reactions. Construction of new facilities may necessitate moving personnel to a new location. Embracing a new technology may mean retraining some people and termi- nating some jobs. Relocation can cause unfavorable reactions, particularly if a town is about to lose a major employer. Conversely, community pressure in a new location may arise if the presence of the company is viewed unfavorably (noise, traffic, pollution).

1 Adapted from Eli Schragenheim and H. William Dettmer, Manufacturing at Warp Speed (Boca Raton: St. Lucie Press, 2000).

Constraint  Something that limits the performance of a pro- cess or system in achieving its goals.

LO5.7 Describe the steps that are used to resolve constraint issues.

LO5.8 Briefly describe approaches that are useful for evaluating capacity alternatives.

ste24102_ch05_184-215.indd 201ste24102_ch05_184-215.indd 201 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

202 Chapter Five Strategic Capacity Planning for Products and Services

A number of techniques are useful for evaluating capacity alternatives from an economic standpoint. Some of the more common are cost–volume analysis, financial analysis, decision theory, and waiting-line analysis. Cost–volume analysis is described in this section. Financial analysis is mentioned briefly, decision analysis is described in the chapter supplement, and waiting-line analysis is described in Chapter 18.

Cost–Volume Analysis Cost–volume analysis focuses on relationships between cost, revenue, and volume of output. The purpose of cost–volume analysis is to estimate the income of an organization under differ- ent operating conditions. It is particularly useful as a tool for comparing capacity alternatives.

Use of the technique requires identification of all costs related to the production of a given product. These costs are then designated as fixed costs or variable costs. Fixed costs tend to remain constant regardless of volume of output. Examples include rental costs, property taxes, equipment costs, heating and cooling expenses, and certain administrative costs. Vari- able costs vary directly with volume of output. The major components of variable costs are generally materials and labor costs. We will assume that variable cost per unit remains the same regardless of volume of output, and that all output can be sold.

Table 5.4 summarizes the symbols used in the cost–volume formulas. The total cost associated with a given volume of output is equal to the sum of the fixed cost

and the variable cost per unit times volume:

TC FC VC� � (5–4)

VC � �Q v (5–5)

where v   �  variable cost per unit. Figure 5.6A shows the relationship between volume of out- put and fixed costs, total variable costs, and total (fixed plus variable) costs.

Revenue per unit, like variable cost per unit, is assumed to be the same regardless of quantity of output. Total revenue will have a linear relationship to output, as illustrated in Figure 5.6B . The total revenue associated with a given quantity of output, Q, is

TR � �R Q (5–6)

Figure 5.6C describes the relationship between profit—which is the difference between total revenue and total (i.e., fixed plus variable) cost—and volume of output. The volume at which total cost and total revenue are equal is referred to as the break-even point (BEP) . When volume is less than the break-even point, there is a loss; when volume is greater than the break-even point, there is a profit. The greater the deviation from this point, the greater the profit or loss. Figure 5.6D shows total profit or loss relative to the break-even point. Figure 5.6D can be obtained from Figure 5.6C by drawing a horizontal line through the point where the total cost and total revenue lines intersect. Total profit can be computed using the formula

TR TC (FC )� � � � � � �P R Q v Q

Rearranging terms, we have

� � �P Q R v( ) FC (5–7)

The difference between revenue per unit and variable cost per unit, R   �   v, is known as the contribution margin.

The required volume, Q, needed to generate a specified profit is

� �

� Q

P

R v

FC (5–8)

A special case of this is the volume of output needed for total revenue to equal total cost. This is the break-even point, computed using the formula

Break-even point (BEP)  The volume of output at which total cost and total revenue are equal.

FC  �  Fixed cost VC  �  Total variable cost v   �  Variable cost per unit TC  �  Total cost TR  �  Total revenue R   �  Revenue per unit Q   �   Quantity or volume of

output Q BEP   �  Break-even quantity

P   �  Profit

TABLE 5.4 Cost–volume symbols

ste24102_ch05_184-215.indd 202ste24102_ch05_184-215.indd 202 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

Chapter Five Strategic Capacity Planning for Products and Services 203

� �

Q R v

FC BEP (5–9)

Different alternatives can be compared by plotting the profit lines for the alternatives, as shown in Figure 5.6E .

Figure 5.6E illustrates the concept of an indifference point : the quantity at which a deci- sion maker would be indifferent between two competing alternatives. In this illustration, a quantity less than the point of indifference would favor choosing alternative B because its profit is higher in that range, while a quantity greater than the point of indifference would favor choosing alternative A.

Indifference point  The quantity that would make two alternatives equivalent.

FIGURE 5.6 Cost–volume relationships

Q (volume in units)

A m

o u

n t

($ )

0

A. Fixed, variable, and total costs

Q (volume in units) A

m o

u n

t ($

)

0

B. Total revenue increases linearly with output

BEP units Q (volume in units)

A m

o u

n t

($ )

0

C. Profit = TR – TC

To tal

cos t =

VC + F

C

To tal

var iab

le c ost

(V C)

Fixed cost (FC)

To ta

l r ev

en ue

To ta

l r ev

en ue

Tot al c

ost Pro

fit

Lo ss

Q (volume in units)

A m

o u

n t

($ )

D. Profit versus loss BEP

Pro fit

Los s

0

A m

o u

n t

($ )

Pro fit f

rom alt

ern ativ

e A

Profit from al ternative B

Q (volume in units)

Point of indifference

E. Point of indifference for two alternatives

0

The owner of Old-Fashioned Berry Pies, S. Simon, is contemplating adding a new line of pies, which will require leasing new equipment for a monthly payment of $6,000. Variable costs would be $2 per pie, and pies would retail for $7 each.

a. How many pies must be sold in order to break even?

b. What would the profit (loss) be if 1,000 pies are made and sold in a month?

c. How many pies must be sold to realize a profit of $4,000?

d. If 2,000 can be sold, and a profit target is $5,000, what price should be charged per pie?

E X A M P L E 3 e celx

mhhe.com/stevenson12e

ste24102_ch05_184-215.indd 203ste24102_ch05_184-215.indd 203 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

204 Chapter Five Strategic Capacity Planning for Products and Services

S O L U T I O N FC $6,000, VC $2 per pie, R $7 per pie� � �

a. FC

R VC

$6,000

$7 $2 1,200 pies/monthBEPQ �

� �

� �

b. For 1,000, ( ) FC 1,000($7 $2) $6,000 $1,000� � � � � � � � �Q P Q R v

c. $4,000; solve for using Formula 5 8:

$4,000 $6,000

$7 $2 2,000 pies

P Q

Q

� �

� �

d. � � �

� � �

Q R v

R

R

Profit ( ) FC

$5,000 2,000( $2) $6,000

$7.50

Capacity alternatives may involve step costs, which are costs that increase stepwise as potential volume increases. For example, a firm may have the option of purchasing one, two, or three machines, with each additional machine increasing the fixed cost, although perhaps not linearly. (See Figure 5.7A .) Then fixed costs and potential volume would depend on the number of machines purchased. The implication is that multiple break-even quantities may occur, possibly one for each range. Note, however, that the total revenue line might not inter- sect the fixed-cost line in a particular range, meaning that there would be no break-even point in that range. This possibility is illustrated in Figure  5.7B , where there is no break-even point in the first range. In order to decide how many machines to purchase, a manager must consider projected annual demand (volume) relative to the multiple break-even points and choose the most appropriate number of machines, as Example 4 shows.

A manager has the option of purchasing one, two, or three machines. Fixed costs and potential volumes are as follows:

Number of Machines

Total Annual Fixed Costs

Corresponding Range of Output

1 $ 9,600 0 to 300 2 15,000 301 to 600 3 20,000 601 to 900

Variable cost is $10 per unit, and revenue is $40 per unit.

a. Determine the break-even point for each range.

b. If projected annual demand is between 580 and 660 units, how many machines should the manager purchase?

e celx mhhe.com/stevenson12e

E X A M P L E 4

FIGURE 5.7 Break-even problem with step fixed costs

Quantity

A. Step fixed costs and variable costs

FC + VC

= T C

FC 1 machine

FC + VC

= T C

FC 2 machines

FC + VC

= T C

FC 3 machines

Quantity

B. Multiple break-even points

1

2

3

BEP3

BEP2

TC

TC

TC

TR

$

ste24102_ch05_184-215.indd 204ste24102_ch05_184-215.indd 204 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

Chapter Five Strategic Capacity Planning for Products and Services 205

Cost–volume analysis can be a valuable tool for comparing capacity alternatives if certain assumptions are satisfied:

1. One product is involved.

2. Everything produced can be sold.

3. The variable cost per unit is the same regardless of the volume.

4. Fixed costs do not change with volume changes, or they are step changes.

5. The revenue per unit is the same regardless of volume.

6. Revenue per unit exceeds variable cost per unit.

As with any quantitative tool, it is important to verify that the assumptions on which the technique is based are reasonably satisfied for a particular situation. For example, revenue per unit or variable cost per unit is not always constant. In addition, fixed costs may not be constant over the range of possible output. If demand is subject to random variations, one must take that into account in the analysis. Also, cost–volume analysis requires that fixed and variable costs can be separated, and this is sometimes exceedingly difficult to accomplish. Cost–volume analysis works best with one product or a few products that have the same cost characteristics.

A notable benefit of cost–volume considerations is the conceptual framework it provides for integrating cost, revenue, and profit estimates into capacity decisions. If a proposal looks attractive using cost–volume analysis, the next step would be to develop cash flow models to see how it fares with the addition of time and more flexible cost functions.

Financial Analysis Operations personnel need to have the ability to do financial analysis. A problem that is univer- sally encountered by managers is how to allocate scarce funds. A common approach is to use financial analysis to rank investment proposals, taking into account the time value of money.

Two important terms in financial analysis are cash flow and present value:

Cash flow refers to the difference between the cash received from sales (of goods or services) and other sources (e.g., sale of old equipment) and the cash outflow for labor, materials, overhead, and taxes.

Present value expresses in current value the sum of all future cash flows of an invest- ment proposal.

The three most commonly used methods of financial analysis are payback, present value, and internal rate of return.

Cash flow  The difference between cash received from sales and other sources, and cash outflow for labor, material, over- head, and taxes.

Present value  The sum, in current value, of all future cash flows of an investment proposal.

S O L U T I O N a. Compute the break-even point for each range using the formula Q BEP   �  FC/( R   �   v ).

For one machine: $9,600

$40/unit $10/unit 320 units [not in range, so there is no BEP]

BEP � �

�Q

For two machines: $15,000

$40/unit $10/unit 500 unitsBEP �

� �Q

For three machines: $20,000

$40/unit $10/unit 666.67 unitsBEP �

� �Q

b. Comparing the projected range of demand to the two ranges for which a break-even point occurs (see Figure 5.7B ), you can see that the break-even point is 500, which is in the range 301 to 600. This means that even if demand is at the low end of the range, it would be above the break-even point and thus yield a profit. That is not true of range 601 to 900. At the top end of projected demand, the volume would still be less than the break-even point for that range, so there would be no profit. Hence, the manager should choose two machines.

ste24102_ch05_184-215.indd 205ste24102_ch05_184-215.indd 205 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

206 Chapter Five Strategic Capacity Planning for Products and Services

Payback is a crude but widely used method that focuses on the length of time it will take for an investment to return its original cost. For example, an investment with an original cost of $6,000 and a monthly net cash flow of $1,000 has a payback period of six months. Payback ignores the time value of money. Its use is easier to rationalize for short-term than for long- term projects.

A new machine will cost $2,000, but it will result in savings of $500 per year. What is the payback time in years?

E X A M P L E 5

S O L U T I O N Initial cost � $2,000 Annual savings � $500 The payback time is initial cost divided by annual savings. Thus, the payback time is

� � �

Initial cost

Annual Saving

$2,000

$500 /yr Payback time 4 years

The present value (PV) method summarizes the initial cost of an investment, its estimated annual cash flows, and any expected salvage value in a single value called the equivalent cur- rent value, taking into account the time value of money (i.e., interest rates).

The internal rate of return (IRR) summarizes the initial cost, expected annual cash flows, and estimated future salvage value of an investment proposal in an equivalent interest rate. In other words, this method identifies the rate of return that equates the estimated future returns and the initial cost.

These techniques are appropriate when there is a high degree of certainty associated with estimates of future cash flows. In many instances, however, operations managers and other managers must deal with situations better described as risky or uncertain. When conditions of risk or uncertainty are present, decision theory is often applied.

Decision Theory Decision theory is a helpful tool for financial comparison of alternatives under conditions of risk or uncertainty. It is suited to capacity decisions and to a wide range of other decisions managers must make. It involves identifying a set of possible future conditions that could influence results, listing alternative courses of action, and developing a financial outcome for each alternative–future condition combination. Decision theory is described in the supple- ment to this chapter.

Waiting-Line Analysis Analysis of lines is often useful for designing or modifying service systems. Waiting lines have a tendency to form in a wide variety of service systems (e.g., airport ticket counters, tele- phone calls to a cable television company, hospital emergency rooms). The lines are symp- toms of bottleneck operations. Analysis is useful in helping managers choose a capacity level that will be cost-effective through balancing the cost of having customers wait with the cost of providing additional capacity. It can aid in the determination of expected costs for various levels of service capacity.

This topic is described in Chapter 18.

Simulation Simulation can be a useful tool in evaluating what-if scenarios. Simulation is described on the book’s Web site.

ste24102_ch05_184-215.indd 206ste24102_ch05_184-215.indd 206 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

Chapter Five Strategic Capacity Planning for Products and Services 207

5.12 OPERATIONS STRATEGY The strategic implications of capacity decisions can be enormous, impacting all areas of the organization. From an operations management standpoint, capacity decisions establish a set of conditions within which operations will be required to function. Hence, it is extremely important to include input from operations management people in making capacity decisions.

Flexibility can be a key issue in capacity decisions, although flexibility is not always an option, particularly in capital-intensive industries. However, where possible, flexibility allows an organi- zation to be agile—that is, responsive to changes in the marketplace. Also, it reduces to a certain extent the dependence on long-range forecasts to accurately predict demand. And flexibility makes it easier for organizations to take advantage of technological and other innovations. Maintaining excess capacity (a capacity cushion) may provide a degree of flexibility, albeit at added cost.

Some organizations use a strategy of maintaining a capacity cushion for the purpose of blocking entry into the market by new competitors. The excess capacity enables them to pro- duce at costs lower than what new competitors can. However, such a strategy means higher- than-necessary unit costs, and it makes it more difficult to cut back if demand slows, or to shift to new product or service offerings.

Efficiency improvements and utilization improvements can provide capacity increases. Such improvements can be achieved by streamlining operations and reducing waste. The chapter on lean operations describes ways for achieving those improvements.

Bottleneck management can be a way to increase effective capacity, by scheduling non- bottleneck operations to achieve maximum utilization of bottleneck operations.

In cases where capacity expansion will be undertaken, there are two strategies for deter- mining the timing and degree of capacity expansion. One is the expand-early strategy (i.e., before demand materializes). The intent might be to achieve economies of scale, to expand market share, or to preempt competitors from expanding. The risks of this strategy include an oversupply that would drive prices down, and underutilized equipment that would result in higher unit costs.

The other approach is the wait-and-see strategy (i.e., to expand capacity only after demand materializes, perhaps incrementally). Its advantages include a lower chance of oversupply due to more accurate matching of supply and demand, and higher capacity utilization. The key risks are loss of market share and the inability to meet demand if expansion requires a long lead time.

In cases where capacity contraction will be undertaken, capacity disposal strategies become important. This can be the result of the need to replace aging equipment with newer equipment. It can also be the result of outsourcing and downsizing operations. The cost or benefit of asset disposal should be taken into account when contemplating these actions.

Capacity refers to a system’s potential for producing goods or delivering services over a specified time interval. Capacity decisions are important because capacity is a ceiling on output and a major determi- nant of operating costs.

Three key inputs to capacity planning are the kind of capacity that will be needed, how much will be needed, and when it will be needed. Accurate forecasts are critical to the planning process.

The capacity planning decision is one of the most important decisions that managers make. The capacity decision is strategic and long-term in nature, often involving a significant initial investment of capital. Capacity planning is particularly difficult in cases where returns will accrue over a lengthy period and risk is a major consideration.

A variety of factors can interfere with effective capacity, so effective capacity is usually somewhat less than design capacity. These factors include facilities design and layout, human factors, product/ service design, equipment failures, scheduling problems, and quality considerations.

Capacity planning involves long-term and short-term considerations. Long-term considerations relate to the overall level of capacity; short-term considerations relate to variations in capacity requirements due to seasonal, random, and irregular fluctuations in demand. Ideally, capacity will match demand. Thus, there is a close link between forecasting and capacity planning, particularly in the long term. In the short term, emphasis shifts to describing and coping with variations in demand.

SUMMARY

ste24102_ch05_184-215.indd 207ste24102_ch05_184-215.indd 207 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

208 Chapter Five Strategic Capacity Planning for Products and Services

1. Capacity decisions can be critical to the success of a business organization because capacity is the supply side of the supply-demand equation, and too little or too much capacity is costly.

2. The key issues in capacity planning relate to determining what kind of capacity is needed, how much is needed, and when it is needed.

3. Volatile demand and long lead times to achieve capacity changes can be challenging.

4. One or more constraints can adversely affect the overall capacity of a system (see, for example, Figure 5.2 ). Capacity increases can only be achieved by loosening those constraints, not by increas- ing other resources, so it is essential to identify constraining resources and focus efforts on over- coming them.

KEY POINTS

bottleneck operation, 197 break-even point (BEP), 202 capacity, 185 capacity cushion, 192

cash flow, 205 constraint, 201 design capacity, 188 diseconomies of scale, 199

economies of scale, 199 effective capacity, 188 indifference point, 203 present value, 205

KEY TERMS

Development of capacity alternatives is enhanced by taking a systems approach to planning, by rec- ognizing that capacity increments are often acquired in chunks, by designing flexible systems, and by considering product/service complements as a way of dealing with various patterns of demand.

In evaluating capacity alternatives, a manager must consider both quantitative and qualitative aspects. Quantitative analysis usually reflects economic factors, and qualitative considerations include intangibles such as public opinion and personal preferences of managers. Cost–volume analysis can be useful for analyzing alternatives.

SOLVED PROBLEMS

A firm’s manager must decide whether to make or buy a certain item used in the production of vending machines. Making the item would involve annual lease costs of $150,000. Cost and volume estimates are as follows:

Make Buy

Annual fixed cost $150,000 None Variable cost/unit $60 $80 Annual volume (units) 12,000 12,000

a. Given these numbers, should the firm buy or make this item?

b. There is a possibility that volume could change in the future. At what volume would the manager be indifferent between making and buying?

Problem 1 e celx

mhhe.com/stevenson12e

Solution a. Determine the annual cost of each alternative: Total cost Fixed cost Volume Variable cost� � �

� � � �

Make: Buy:

$150,000 12,000($60) $870,000 0 12,000($80) $960,000

Because the annual cost of making the item is less than the annual cost of buying it, the manager would reasonably choose to make the item. Note: If the unit cost to buy had been less than the vari- able cost to make, there would be no need to even consider fixed costs; it would simply have been better to buy.

b. To determine the volume at which the two choices would be equivalent, set the two total costs equal to each other and solve for volume: TC make   �  TC buy . Thus, $150,000  �   Q ($60)  �  0  �   Q ($80). Solving, Q   �  7,500 units. Therefore, at a volume of 7,500 units a year, the manager would be indifferent between making and buying. For lower volumes, the choice would be to buy, and for higher volumes, the choice would be to make.

ste24102_ch05_184-215.indd 208ste24102_ch05_184-215.indd 208 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

Chapter Five Strategic Capacity Planning for Products and Services 209

? Units (Indifferent volume)

$

$150,000

0

TCmake

FCmake

TC b uy

Problem 2 A small firm produces and sells automotive items in a five-state area. The firm expects to consolidate assembly of its battery chargers line at a single location. Currently, operations are in three widely scattered locations. The leading candidate for location will have a monthly fixed cost of $42,000 and variable costs of $3 per charger. Chargers sell for $7 each. Prepare a table that shows total profits, fixed costs, variable costs, and revenues for monthly volumes of 10,000, 12,000, and 15,000 units. What is the break-even point?

e celx mhhe.com/stevenson12e

Solution � �

� � �

� � �

Q R v

v Q

Revenue $7 per unit

Variable cost $3 per unit

Fixed cost $42,000 per month

Profit ( ) FC

Total cost FC

Volume Total

Revenue Total VC

Fixed Cost

Total Cost

Total Profit

10,000 $ 70,000 $30,000 $42,000 $72,000 $(2,000) 12,000 84,000 36,000 42,000 78,000 6,000 15,000 105,000 45,000 42,000 87,000 18,000

FC $42,000

$7 $3 10,500 units per monthBEP �

� �

� �Q

R v

Problem 3 Refer to Problem 2. Determine profit when volume equals 22,000 units.

Solution Profit ( ) FC ($7 $3) $42,000 $4 $42,000� � � � � � � �Q R v Q Q

For Q   �  22,000, profit is

$4(22,000) $42,000 $46,000� �

Problem 4 A manager must decide which type of equipment to buy, Type A or Type B. Type A equipment costs $15,000 each, and Type B costs $11,000 each. The equipment can be operated eight hours a day, 250 days a year.

Either machine can be used to perform two types of chemical analysis, C1 and C2. Annual ser- vice requirements and processing times are shown in the following table. Which type of equipment should be purchased, and how many of that type will be needed? The goal is to minimize total pur- chase cost.

e celx mhhe.com/stevenson12e

ste24102_ch05_184-215.indd 209ste24102_ch05_184-215.indd 209 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

210 Chapter Five Strategic Capacity Planning for Products and Services

PROCESSING TIME PER ANALYSIS (hr)

Analysis Type Annual Volume A B

C1 1,200 1 2 C2 900 3 2

Solution Total processing time (Annual volume  �  Processing time per analysis) needed by type of equipment:

Analysis Type A B

C1 1,200 2,400 C2 2,700 1,800

Total 3,900 4,200

Total processing time available per piece of equipment is 8 hours/day  �  250 days/year  �  2,000. Hence, one piece can handle 2,000 hours of analysis, two pieces of equipment can handle 4,000 hours, and so on.

Given the total processing requirements, two of Type A would be needed, for a total cost of 2  �  $15,000  �  $30,000, or three of Type B, for a total cost of 3  �  $11,000  �  $33,000. Thus, two pieces of Type A would have sufficient capacity to handle the load at a lower cost than three of Type B.

Problem 5 Processes are commonly represented in either of two ways. One style uses blocks to represent opera- tions and the other uses circles. The block style was illustrated on p. 000. A similar style uses circles rather than blocks:

1 2 3

4 5 6

7

Process can operate in series, as shown in the preceding diagram, or in parallel, as shown here:

Question: What is the capacity (attainable output) of this system?

1

Operation Operation Operation

2 3

1

10 units/hr 15 units/hr 12 units/hr

11 units/hr 14 units/hr 9 units/hr

?

2 3

4 5 6

7

20 units/hr

Solution The attainable output of each portion of the system is equal to the output of the slowest operation. So the output of the upper portion is 10 units per hour and the output of the lower portion is 9 units per hour. Together the two portions can produce 10  �  9  �  19 units per hour. Although operation #7 can handle 20 units per hour, only 19 units per hour come from the two previous portions of the system, so the system output can only be 19 units per hour.

ste24102_ch05_184-215.indd 210ste24102_ch05_184-215.indd 210 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

Chapter Five Strategic Capacity Planning for Products and Services 211

1. Contrast design capacity and effective capacity.

2. List and briefly explain three factors that may inhibit capacity utilization.

3. How do long-term and short-term capacity considerations differ?

4. Give an example of a good and a service that exhibit these seasonal demand patterns: a. Annual b. Monthly c. Weekly d. Daily

5. Give some examples of building flexibility into system design.

6. Why is it important to adopt a big-picture approach to capacity planning?

7. What is meant by “capacity in chunks,” and why is that a factor in capacity planning?

8. What kinds of capacity problems do many elementary and secondary schools periodically experi- ence? What are some alternatives to deal with those problems?

9. How can a systems approach to capacity planning be useful?

10. How do capacity decisions influence productivity?

11. Why is it important to match process capabilities with product requirements?

12. Briefly discuss how uncertainty affects capacity decisions.

13. Discuss the importance of capacity planning in deciding on the number of police officers or fire trucks to have on duty at a given time.

14. Why is capacity planning one of the most critical decisions a manager has to make?

15. Why is capacity planning for services more challenging than it is for goods production?

16. What are some capacity measures for each of the following? a. University b. Hospital c. Computer repair shop d. Farm

17. What is the benefit to a business organization of having capacity measures?

DISCUSSION AND REVIEW QUESTIONS

1. What are the major trade-offs in capacity planning?

2. Who needs to be involved in capacity planning?

3. In what ways does technology have an impact on capacity planning?

TAKING STOCK

1. A computer repair service has a design capacity of 80 repairs per day. Its effective capacity, how- ever, is 64 repairs per day, and its actual output is 62 repairs per day. The manager would like to increase the number of repairs per day. Which of the following factors would you recommend that the manager investigate: quality problems, absenteeism, or scheduling and balancing? Explain your reasoning.

2. Compared to manufacturing, service requirements tend to be more time dependent, location dependent, and volatile. In addition, service quality is often directly observable by customers. Find a recent article in a business magazine that describes how a service organization is struggling with one or more of these issues and make recommendations on what an organization needs to do to overcome these difficulties.

3. Identify four potential unethical actions or inactions related to capacity planning, and the ethical principle each violates (see Chapter 1).

4. Any increase in efficiency also increases utilization. Although the upper limit on efficiency is 100%, what can be done to achieve still higher levels of utilization?

CRITICAL THINKING

EXERCISES

ste24102_ch05_184-215.indd 211ste24102_ch05_184-215.indd 211 11/29/13 1:06 AM11/29/13 1:06 AM

Final PDF to printer

212 Chapter Five Strategic Capacity Planning for Products and Services

1. Determine the utilization and the efficiency for each of these situations: a. A loan processing operation that processes an average of 7 loans per day. The operation has a

design capacity of 10 loans per day and an effective capacity of 8 loans per day. b. A furnace repair team that services an average of four furnaces a day if the design capacity is six

furnaces a day and the effective capacity is five furnaces a day. c. Would you say that systems that have higher efficiency ratios than other systems will always

have higher utilization ratios than those other systems? Explain.

2. In a job shop, effective capacity is only 50 percent of design capacity, and actual output is 80  percent of effective output. What design capacity would be needed to achieve an actual output of eight jobs per week?

3. A producer of pottery is considering the addition of a new plant to absorb the backlog of demand that now exists. The primary location being considered will have fixed costs of $9,200 per month and variable costs of 70 cents per unit produced. Each item is sold to retailers at a price that averages 90 cents. a. What volume per month is required in order to break even? b. What profit would be realized on a monthly volume of 61,000 units? 87,000 units? c. What volume is needed to obtain a profit of $16,000 per month? d. What volume is needed to provide a revenue of $23,000 per month? e. Plot the total cost and total revenue lines.

4. A small firm intends to increase the capacity of a bottleneck operation by adding a new machine. Two alternatives, A and B, have been identified, and the associated costs and revenues have been estimated. Annual fixed costs would be $40,000 for A and $30,000 for B; variable costs per unit would be $10 for A and $11 for B; and revenue per unit would be $15. a. Determine each alternative’s break-even point in units. b. At what volume of output would the two alternatives yield the same profit? c. If expected annual demand is 12,000 units, which alternative would yield the higher profit?

5. A producer of felt-tip pens has received a forecast of demand of 30,000 pens for the coming month from its marketing department. Fixed costs of $25,000 per month are allocated to the felt-tip opera- tion, and variable costs are 37 cents per pen. a. Find the break-even quantity if pens sell for $1 each. b. At what price must pens be sold to obtain a monthly profit of $15,000, assuming that estimated

demand materializes?

6. A real estate agent is considering changing her cell phone plan. There are three plans to choose from, all of which involve a monthly service charge of $20. Plan A has a cost of $.45 a minute for daytime calls and $.20 a minute for evening calls. Plan B has a charge of $.55 a minute for daytime calls and $.15 a minute for evening calls. Plan C has a flat rate of $80 with 200 minutes of calls allowed per month and a charge of $.40 per minute beyond that, day or evening. a. Determine the total charge under each plan for this case: 120 minutes of day calls and

40  minutes of evening calls in a month. b. Prepare a graph that shows total monthly cost for each plan versus daytime call minutes. c. If the agent will use the service for daytime calls, over what range of call minutes will each plan

be optimal? d. Suppose that the agent expects both daytime and evening calls. At what point (i.e., percentage of

call minutes for daytime calls) would she be indifferent between plans A and B?

7. A firm plans to begin production of a new small appliance. The manager must decide whether to purchase the motors for the appliance from a vendor at $7 each or to produce them in-house. Either of two processes could be used for in-house production; one would have an annual fixed cost of $160,000 and a variable cost of $5 per unit, and the other would have an annual fixed cost of $190,000 and a variable cost of $4 per unit. Determine the range of annual volume for which each of the alternatives would be best.

8. A manager is trying to decide whether to purchase a certain part or to have it produced internally. Internal production could use either of two processes. One would entail a variable cost of $17 per unit and an annual fixed cost of $200,000; the other would entail a variable cost of $14 per unit and an annual fixed cost of $240,000. Three vendors are willing to provide the part. Vendor A has a price of $20 per unit for any volume up to 30,000 units. Vendor B has a price of $22 per unit for demand of 1,000 units or less, and $18 per unit for larger quantities. Vendor C offers a price of $21 per unit for the first 1,000 units, and $19 per unit for additional units.

PROBLEMS

ste24102_ch05_184-215.indd 212ste24102_ch05_184-215.indd 212 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

Chapter Five Strategic Capacity Planning for Products and Services 213

a. If the manager anticipates an annual volume of 10,000 units, which alternative would be best from a cost standpoint? For 20,000 units, which alternative would be best?

b. Determine the range for which each alternative is best. Are there any alternatives that are never best? Which?

9. A company manufactures a product using two machine cells. Each cell has a design capacity of 250 units per day and an effective capacity of 230 units per day. At present, actual output averages 200 units per cell, but the manager estimates that productivity improvements soon will increase output to 225 units per day. Annual demand is currently 50,000 units. It is fore- casted that within two years, annual demand will triple. How many cells should the company plan to produce to satisfy predicted demand under these conditions? Assume 240 workdays per year.

10. A company must decide which type of machine to buy, and how many units of that type, given the following information:

Type Cost

1 $10,000

2 14,000

Product demand and processing times for the equipment are:

Product Annual

Demand

PROCESSING TIME PER UNIT (minutes)

1 2

001 12,000 4 6

002 10,000 9 9

003 18,000 5 3

a. How many machines of each type would be required to handle demand if the machines will operate 8 hours a day, 250 days a year, and what annual capacity cushion in processing time would result for each?

b. With high certainty of annual demand, which type of machine would be chosen if that was an important consideration? With low certainty, which type of machine would be chosen?

c. If purchasing and operating costs are taken into account, which type of machine would mini- mize total costs, given your answer for part a? Operating costs are $6/hr for type 1 and $5/hr for type 2.

11. A manager must decide which type of machine to buy, A, B, or C. Machine costs are as follows:

Machine Cost

A $40,000 B $30,000 C $80,000

Product forecasts and processing times on the machines are as follows:

PROCCESSING TIME PER UNIT (minutes)

Product Annual

Demand A B C

1 16,000 3 4 2 2 12,000 4 4 3 3 6,000 5 6 4 4 30,000 2 2 1

a. Assume that only purchasing costs are being considered. Which machine would have the low- est total cost, and how many of that machine would be needed? Machines operate 10 hours a day, 250 days a year.

b. Consider this additional information: The machines differ in terms of hourly operating costs: The A machines have an hourly operating cost of $10 each, B machines have an hourly oper- ating cost of $11 each, and C machines have an hourly operating cost of $12 each. Which alternative would be selected, and how many machines, in order to minimize total cost while satisfying capacity processing requirements?

ste24102_ch05_184-215.indd 213ste24102_ch05_184-215.indd 213 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

214 Chapter Five Strategic Capacity Planning for Products and Services

12. A manager must decide how many machines of a certain type to purchase. Each machine can pro- cess 100 customers per day. One machine will result in a fixed cost of $2,000 per day, while two machines will result in a fixed cost of $3,800 per day. Variable costs will be $20 per customer, and revenue will be $45 per customer. a. Determine the break-even point for each range. b. If estimated demand is 90 to 120 customers per day, how many machines should be purchased?

13. The manager of a car wash must decide whether to have one or two wash lines. One line will mean a fixed cost of $6,000 a month, and two lines will mean a fixed cost of $10,500 a month. Each line would be able to process 15 cars an hour. Variable costs will be $3 per car, and revenue will be $5.95 per car. The manager projects an average demand of between 14 and 18 cars an hour. Would you recommend one or two lines? The car wash is open 300 hours a month.

14. The following diagram shows a four-step process that begins with Operation 1 and ends with Operation 4. The rates shown in each box represent the effective capacity of that operation. a. Determine the capacity of this process. b. Which action would yield the greatest increase in process capacity: (1) increase the capacity

of Operation 1 by 15 percent; (2) increase the capacity of Operation 2 by 10 percent; or (3) increase the capacity of Operation 3 by 10 percent?

Operation 1 Operation 2 Operation 3 Operation 4

12/hr 15/hr 11/hr 14/hr

15. Given the following diagram, a. What is the capacity of this system? b. If the capacity of one operation could be increased in order to increase the output of the sys-

tem, which operation should it be, and what amount of increase?

1

17 units/hr

18 units/hr 15 units/hr 16 units/hr

15 units/hr 17 units/hr

20 units/hr 24 units/hr

2 3

4 5 6

7 8

16. Find the capacity of this system:

1

22 units/hr 17 units/hr 15 units/hr

20 units/hr 18 units/hr 18 units/hr

22 units/hr 17 units/hr 18 units/hr

51 units/hr 54 units/hr

2 3

4 5 6

7 8 9

10 11

17. The following diagram describes a service process where customers go through through either of two parallel three-step processes and then merge into a single line for two final steps. Capacities of each step are shown on the diagram. a. What is the current capacity of the entire system? b. If you could increase the capacity of only one operation through process improvement efforts,

which operation would you select, how much additional capacity would you strive for, and what would the resulting capacity of the process be?

ste24102_ch05_184-215.indd 214ste24102_ch05_184-215.indd 214 11/10/13 6:59 PM11/10/13 6:59 PM

Final PDF to printer

Chapter Five Strategic Capacity Planning for Products and Services 215

1

15/hr

5/hr 8/hr 12/hr

34/hr 30/hr

10/hr 20/hr

2 3

4 5 6

7 8

18. A new piece of equipment will cost $12,000 and will result in a reduced operation cost of $1,500 per year. What will the payback time be in years?

19. A new machine will cost $18,000, but result it will in savings of $2,400 per year. What will the payback time be in years?

20. Remodeling an office will cost $25,000 and will generate savings of $3,000 the first year, $4,000 the second year, and $5,000 per year thereafter. How long will it take to recoup the initial cost of remodeling?

Due to financial pressures that many hospitals face, the Deaconess Clinic in Billings, Montana, decided to outsource a number of services, although in somewhat different ways.

First, the hospital outsourced its cafeteria food service. Although the food service employees were hired by the outside firm, they still felt a sense of ownership of their jobs, and still felt connected to the hospital because of the family atmosphere in the kitchen and the cafeteria.

When the hospital tried the same thing with housekeeping, employee turnover became a problem. An investigation revealed that because the housekeeping employees were more isolated in their work, they lost what little feeling of being connected to the hospital they had. The prob- lem was solved by hiring the employees back but using the outsource company to manage housekeeping.

The hospital also decided to outsource its laundry service. This time the hospital approached a rival hospital about joining it in outsourcing laundry service.

Questions

1. In some instances the outsourced service occurs in a different loca- tion, while in others it takes place inside the organization doing the outsourcing, as the food service did in this case. What advantages were there in having the outsourced work performed within the hos- pital? Suppose a different hospital outsourced its food service but decided not to have the work performed in-house. What might its rationale be?

2. In the housekeeping situation, why not just forget about outsourc- ing, especially since the hospital ended up rehiring its employees anyway?

3. For laundry service, what might have been the rationale for asking another hospital to join it?

Source: Based on Norm Friedman, “Is Outsourcing the Solution?” www.hpnonline.com/inside/June04/outsourcing.htm .

CASE Outsourcing of Hospital Services

rs in a different loca

Allspaw, John. The Art of Capacity Planning: Scaling Web Resources. Sebastopol, CA: O’Reilly Media, 2008.

Goldratt, Eliyahu M. Theory of Constraints. Great Barrington, MA: North River Press, 2000.

Gunther, Neil J. Guerrilla Capacity Planning: A Tactical Approach to Planning for Highly Scalable Applications and Services. New York: Springer-Verlag, 2007.

Jacobs, F. Robert, William Berry, D. Clay Whybark, and Thomas Vollman. Manufacturing Planning and Control for Supply Chain Management. New York: McGraw-Hill, 2011.

La Piana, David. The Nonprofit Strategy Revolution: Real Time Strategic Planning in a Rapid Response World. St. Paul, MN: Fieldstone Alliance, 2008.

SELECTED BIBLIOGRAPHY AND FURTHER

READINGS

ste24102_ch05_184-215.indd 215ste24102_ch05_184-215.indd 215 11/29/13 1:06 AM11/29/13 1:06 AM

Final PDF to printer

216

5S.1 INTRODUCTION Decision theory represents a general approach to decision making. It is suitable for a wide range of operations management decisions. Among them are capacity planning, product and service design, equipment selection, and location planning. Decisions that lend themselves to a decision theory approach tend to be characterized by the following elements:

1. A set of possible future conditions that will have a bearing on the results of the decision.

2. A list of alternatives for the manager to choose from.

3. A known payoff for each alternative under each possible future condition.

To use this approach, a decision maker would employ this process:

1. Identify the possible future conditions (e.g., demand will be low, medium, or high; the competitor will or will not introduce a new product). These are called states of nature.

2. Develop a list of possible alternatives, one of which may be to do nothing.

3. Determine or estimate the payoff associated with each alternative for every possible future condition.

SUPPLEMENT TO

C H A P T E R 5 SUPPLEMENT OUTLINE

5S.1 Introduction, 216

5S.2 The Decision Process and Causes of Poor Decisions, 217

5S.3 Decision Environments, 218

5S.4 Decision Making under Certainty, 218

5S.5 Decision Making under Uncertainty, 219

5S.6 Decision Making under Risk, 220

5S.7 Decision Trees, 221

5S.8 Expected Value of Perfect Information, 223

5S.9 Sensitivity Analysis, 224

Decision Theory LEARNING OBJECTIVES After completing this supplement, you should be able to: LO5S.1 Outline the steps in the decision

process.

LO5S.2 Name some causes of poor decisions.

LO5S.3 Describe and use techniques that apply to decision making under uncertainty.

LO5S.4 Describe and use the expected- value approach.

LO5S.5 Construct a decision tree and use it to analyze a problem.

LO5S.6 Compute the expected value of perfect information.

LO5S.7 Conduct sensitivity analysis on a simple decision problem.

ste24102_ch05s_216-235.indd 216ste24102_ch05s_216-235.indd 216 11/10/13 7:45 PM11/10/13 7:45 PM

Final PDF to printer

Supplement to Chapter Five Decision Theory 217

4. If possible, estimate the likelihood of each possible future condition.

5. Evaluate alternatives according to some decision criterion (e.g., maximize expected profit), and select the best alternative.

The information for a decision is often summarized in a payoff table , which shows the expected payoffs for each alternative under the various possible states of nature. These tables are helpful in choosing among alternatives because they facilitate comparison of alternatives. Consider the following payoff table, which illustrates a capacity planning problem.

The payoffs are shown in the body of the table. In this instance, the payoffs are in terms of present values, which represent equivalent current dollar values of expected future income less costs. This is a convenient measure because it places all alternatives on a comparable basis. If a small facility is built, the payoff will be the same for all three possible states of nature. For a medium facility, low demand will have a present value of $7 million, whereas both moderate and high demand will have present values of $12 million. A large facility will have a loss of $4 million if demand is low, a present value of $2 million if demand is moder- ate, and a present value of $16 million if demand is high.

The problem for the decision maker is to select one of the alternatives, taking the present value into account.

Evaluation of the alternatives differs according to the degree of certainty associated with the possible future conditions.

5S.2 THE DECISION PROCESS AND CAUSES OF POOR DECISIONS

Despite the best efforts of a manager, a decision occasionally turns out poorly due to unfore- seeable circumstances. Luckily, such occurrences are not common. Often, failures can be traced to a combination of mistakes in the decision process, to bounded rationality, or to suboptimization.

The decision process consists of these steps:

1. Identify the problem.

2. Specify objectives and criteria for a solution.

3. Develop suitable alternatives.

4. Analyze and compare alternatives.

5. Select the best alternative.

6. Implement the solution.

7. Monitor to see that desired result is achieved.

In many cases, managers fail to appreciate the importance of each step in the decision- making process. They may skip a step or not devote enough effort to completing it before jumping to the next step. Sometimes this happens owing to a manager’s style of making quick decisions or a failure to recognize the consequences of a poor decision. The manager’s ego can be a factor. This sometimes happens when the manager has experienced a series of successes— important decisions that turned out right. Some managers then get the impression that they can do no wrong. But they soon run into trouble, which is usually enough to bring them back down

Payoff table  Table showing the expected payoffs for each alternative in every possible state of nature.

LO5S.2 Name some causes of poor decisions.

POSSIBLE FUTURE DEMAND

Alternatives Low Moderate High

Small facility $10 * $10 $10 Medium facility 7 12 12 Large facility (4) 2 16 *Present value in $ millions.

LO5S.1 Outline the steps in the decision process.

ste24102_ch05s_216-235.indd 217ste24102_ch05s_216-235.indd 217 11/10/13 7:45 PM11/10/13 7:45 PM

Final PDF to printer

218 Supplement to Chapter Five Decision Theory

to earth. Other managers seem oblivious to negative results and continue the process they associate with their previous successes, not recognizing that some of that success may have been due more to luck than to any special abilities of their own. A part of the problem may be the manager’s unwillingness to admit a mistake. Yet other managers demonstrate an inability to make a decision; they stall long past the time when the decision should have been rendered.

Of course, not all managers fall into these traps—it seems safe to say that the majority do not. Even so, this does not necessarily mean that every decision works out as expected. Another factor with which managers must contend is bounded rationality , or the limits imposed on decision making by costs, human abilities, time, technology, and the availability of information. Because of these limitations, managers cannot always expect to reach deci- sions that are optimal in the sense of providing the best possible outcome (e.g., highest profit, least cost). Instead, they must often resort to achieving a satisfactory solution.

Still another cause of poor decisions is that organizations typically departmentalize deci- sions. Naturally, there is a great deal of justification for the use of departments in terms of overcoming span-of-control problems and human limitations. However, suboptimization can occur. This is a result of different departments’ attempts to reach a solution that is optimum for each. Unfortunately, what is optimal for one department may not be optimal for the orga- nization as a whole. If you are familiar with the theory of constraints (see Chapter 16), subop- timization and local optima are conceptually the same, with the same negative consequences.

5S.3 DECISION ENVIRONMENTS Operations management decision environments are classified according to the degree of cer- tainty present. There are three basic categories: certainty, risk, and uncertainty.

Certainty means that relevant parameters such as costs, capacity, and demand have known values.

Risk means that certain parameters have probabilistic outcomes.

Uncertainty means that it is impossible to assess the likelihood of various possible future events.

Consider these situations:

1. Profit per unit is $5. You have an order for 200 units. How much profit will you make? (This is an example of certainty since unit profits and total demand are known.)

2. Profit is $5 per unit. Based on previous experience, there is a 50 percent chance of an order for 100 units and a 50 percent chance of an order for 200 units. What is expected profit? (This is an example of risk since demand outcomes are probabilistic.)

3. Profit is $5 per unit. The probabilities of potential demands are unknown. (This is an example of uncertainty. )

The importance of these different decision environments is that they require different anal- ysis techniques. Some techniques are better suited for one category than for others.

5S.4 DECISION MAKING UNDER CERTAINTY When it is known for certain which of the possible future conditions will actually happen, the decision is usually relatively straightforward: Simply choose the alternative that has the best payoff under that state of nature. Example 5S–1 illustrates this.

Bounded rationality  The limitations on decision making caused by costs, human abilities, time, technology, and availability of information.

Suboptimization  The result of different departments each attempting to reach a solu- tion that is optimum for that department.

Certainty Environment in which relevant parameters have known values.

Risk Environment in which cer- tain future events have probable outcomes.

Uncertainty Environment in which it is impossible to assess the likelihood of various future events.

E X A M P L E 5 S – 1

Determine the best alternative in the payoff table on the previous page for each of the cases: It is known with certainty that demand will be ( a ) low, ( b ) moderate, ( c ) high.

ste24102_ch05s_216-235.indd 218ste24102_ch05s_216-235.indd 218 11/10/13 7:45 PM11/10/13 7:45 PM

Final PDF to printer

Supplement to Chapter Five Decision Theory 219

Choose the alternative with the highest payoff. Thus, if we know demand will be low, we would elect to build the small facility and realize a payoff of $10 million. If we know demand will be moderate, a medium factory would yield the highest payoff ($12 million versus either $10 million or $2 million). For high demand, a large facility would provide the highest payoff.

Although complete certainty is rare in such situations, this kind of exercise provides some perspective on the analysis. Moreover, in some instances, there may be an opportunity to con- sider allocation of funds to research efforts, which may reduce or remove some of the uncer- tainty surrounding the states of nature, converting uncertainty to risk or to certainty.

5S.5 DECISION MAKING UNDER UNCERTAINTY At the opposite extreme is complete uncertainty: No information is available on how likely the various states of nature are. Under those conditions, four possible decision criteria are maximin, maximax, Laplace, and minimax regret. These approaches can be defined as follows:

Maximin —Determine the worst possible payoff for each alternative, and choose the alternative that has the “best worst.” The maximin approach is essentially a pessimistic one because it takes into account only the worst possible outcome for each alternative. The actual outcome may not be as bad as that, but this approach establishes a “guaranteed minimum.”

Maximax —Determine the best possible payoff, and choose the alternative with that pay- off. The maximax approach is an optimistic, “go for it” strategy; it does not take into account any payoff other than the best.

Laplace —Determine the average payoff for each alternative, and choose the alternative with the best average. The Laplace approach treats the states of nature as equally likely.

Minimax regret —Determine the worst regret for each alternative, and choose the alter- native with the “best worst.” This approach seeks to minimize the difference between the payoff that is realized and the best payoff for each state of nature.

The next two examples illustrate these decision criteria.

S O L U T I O N

Maximin Choose the alterna- tive with the best of the worst possible payoffs.

Maximax Choose the alter- native with the best possible payoff.

Laplace Choose the alternative with the best average payoff of any of the alternatives.

Minimax regret Choose the alternative that has the least of the worst regrets.

S O L U T I O N

E X A M P L E 5 S – 2

e celx mhhe.com/stevenson12e

Referring to the payoff table on page 217, determine which alternative would be chosen under each of these strategies:

a. Maximin

b. Maximax

c. Laplace

a. Using maximin, the worst payoffs for the alternatives are as follows: Small facility: $10 million

Medium facility: 7 million

Large facility: �4 million

Hence, since $10 million is the best, choose to build the small facility using the maximin strategy.

b. Using maximax, the best payoffs are as follows: Small facility: $10 million

Medium facility: 12 million

Large facility: 16 million

The best overall payoff is the $16 million in the third row. Hence, the maximax criterion leads to building a large facility.

LO5S.3 Describe and use techniques that apply to deci- sion making under uncertainty.

ste24102_ch05s_216-235.indd 219ste24102_ch05s_216-235.indd 219 11/10/13 7:45 PM11/10/13 7:45 PM

Final PDF to printer

220 Supplement to Chapter Five Decision Theory

Regret (opportunity loss)   The difference between a given payoff and the best payoff for a state of nature.

c. For the Laplace criterion, first find the row totals, and then divide each of those amounts by the number of states of nature (three in this case). Thus, we have

Row Total (in $ millions)

Row Average (in $ millions)

Small facility $30 $10.00

Medium facility 31 10.33

Large facility 14 4.67

Because the medium facility has the highest average, it would be chosen under the Laplace criterion.

E X A M P L E 5 S – 3

Determine which alternative would be chosen using a minimax regret approach to the capac- ity planning program.

The first step in this approach is to prepare a table of regrets (or opportunity losses ) . To do this, subtract every payoff in each column from the best payoff in that column. For instance, in the first column, the best payoff is 10, so each of the three numbers in that column must be subtracted from 10. Going down the column, the regrets will be 10  �  10  �  0, 10  �  7  �  3, and 10  �  ( � 4)  �  14. In the second column, the best payoff is 12. Subtracting each payoff from 12 yields 2, 0, and 10. In the third column, 16 is the best payoff. The regrets are 6, 4, and 0. These results are summarized in a regret table:

REGRETS (IN $ MILLIONS)

Alternatives Low Moderate High Worst

Small facility $0 $2 $6 $6

Medium facility 3 0 4 4

Large facility 14 10 0 14

The second step is to identify the worst regret for each alternative. For the first alternative, the worst is 6; for the second, the worst is 4; and for the third, the worst is 14.

The best of these worst regrets would be chosen using minimax regret. The lowest regret is 4, which is for a medium facility. Hence, that alternative would be chosen.

Solved Problem 6 at the end of this supplement illustrates decision making under uncer- tainty when the payoffs represent costs.

The main weakness of these approaches (except for Laplace) is that they do not take into account all of the payoffs. Instead, they focus on the worst or best, and so they lose some information. Still, for a given set of circumstances, each has certain merits that can be helpful to a decision maker.

5S.6 DECISION MAKING UNDER RISK Between the two extremes of certainty and uncertainty lies the case of risk: The probability of occurrence for each state of nature is known. (Note that because the states are mutually exclusive and collectively exhaustive, these probabilities must add to 1.00.) A widely used approach under such circumstances is the expected monetary value criterion. The expected value is computed for each alternative, and the one with the best expected value is selected. The expected value is the sum of the payoffs for an alternative where each payoff is weighted by the probability for the relevant state of nature. Thus, the approach is

Expected monetary value (EMV) criterion —Determine the expected payoff of each alternative, and choose the alternative that has the best expected payoff.

Expected monetary value (EMV) criterion  The best expected value among the alternatives.

S O L U T I O N

LO5S.4 Describe and use the expected-value approach.

ste24102_ch05s_216-235.indd 220ste24102_ch05s_216-235.indd 220 11/10/13 7:45 PM11/10/13 7:45 PM

Final PDF to printer

Supplement to Chapter Five Decision Theory 221

Using the expected monetary value criterion, identify the best alternative for the previous payoff table for these probabilities: low  �  .30, moderate  �  .50, and high  �  .20.

E X A M P L E 5 S – 4

e celx mhhe.com/stevenson12e

Find the expected value of each alternative by multiplying the probability of occurrence for each state of nature by the payoff for that state of nature and summing them:

EV .30($10)

EV .30($7) EV .30($ 4)

.50($10)

.50($12)

.50($2)

.20($10) $10

.20($12) $10.5

.20($16) $3

small

medium

large

� � �

� � �

� � �

� Hence, choose the medium facility because it has the highest expected value.

S O L U T I O N

The expected monetary value approach is most appropriate when a decision maker is nei- ther risk averse nor risk seeking, but is risk neutral. Typically, well-established organizations with numerous decisions of this nature tend to use expected value because it provides an indi- cation of the long-run, average payoff. That is, the expected-value amount (e.g., $10.5 million in the last example) is not an actual payoff but an expected or average amount that would be approximated if a large number of identical decisions were to be made. Hence, if a decision maker applies this criterion to a large number of similar decisions, the expected payoff for the total will approximate the sum of the individual expected payoffs.

5S.7 DECISION TREES In health care the array of treatment options and medical costs makes tools such as decision trees particularly valuable in diagnosing and prescribing treatment plans. For example, if a 20-year-old and a 50-year-old both are brought into an emergency room complaining of chest pains, the attending physician, after asking each some questions on family history, patient his- tory, general health, and recent events and activities, will use a decision tree to sort through the options to arrive at the appropriate decision for each patient.

Decision trees are tools that have many practical applications, not only in health care but also in legal cases and a wide array of management decision making, including credit card fraud; loan, credit, and insurance risk analysis; decisions on new product or service develop- ment; and location analysis.

A decision tree is a schematic representation of the alternatives available to a decision maker and their possible consequences. The term gets its name from the treelike appearance of the diagram (see Figure 5S.1 ). Although tree diagrams can be used in place of a payoff

FIGURE 5S.1 Format of a decision tree State

of na ture 1

State of nature 2

State of na

ture 1

State of nature 2

Payoff 1

Payoff 2

Payoff 3

Payoff 4

Payoff 5

Payoff 6

2

2

Choose A'1

Choose A'2 1

Ch oo

se A1

Choose A 2

Initial decision

Possible second decisions

Choose A'3

Choose A' 4

Decision point Chance event

e celx mhhe.com/stevenson12e

Decision tree A schematic representation of the available alternatives and their possible consequences.

LO5S.5 Construct a decision tree and use it to analyze a problem.

ste24102_ch05s_216-235.indd 221ste24102_ch05s_216-235.indd 221 11/10/13 7:45 PM11/10/13 7:45 PM

Final PDF to printer

222 Supplement to Chapter Five Decision Theory

table, they are particularly useful for analyzing situations that involve sequential decisions. For instance, a manager may initially decide to build a small facility only to discover that demand is much higher than anticipated. In this case, the manager may then be called upon to make a subsequent decision on whether to expand or build an additional facility.

A decision tree is composed of a number of nodes that have branches emanating from them (see Figure 5S.1 ). Square nodes denote decision points, and circular nodes denote chance events. Read the tree from left to right. Branches leaving square nodes represent alternatives; branches leaving circular nodes represent chance events (i.e., the possible states of nature).

After the tree has been drawn, it is analyzed from right to left; that is, starting with the last decision that might be made. For each decision, choose the alternative that will yield the greatest return (or the lowest cost). If chance events follow a decision, choose the alternative that has the highest expected monetary value (or lowest expected cost).

Low dem

and (.4)

High demand (.6)

$40

Do not

hin g

Expand

Bu ild

sm all

Build large

Overtime

Do not

hin g

Reduce prices Low

dem and

(.4)

High demand (.6)

$50

$55

($10)

$50

$40

$70

E X A M P L E 5 S – 5

A manager must decide on the size of a video arcade to construct. The manager has narrowed the choices to two: large or small. Information has been collected on payoffs, and a decision tree has been constructed. Analyze the decision tree and determine which initial alternative (build small or build large) should be chosen in order to maximize expected monetary value.

S O L U T I O N The dollar amounts at the branch ends indicate the estimated payoffs if the sequence of chance events and decisions that is traced back to the initial decision occurs. For example, if the initial decision is to build a small facility and it turns out that demand is low, the payoff will be $40 (thousand). Similarly, if a small facility is built, demand turns out high, and a later decision is made to expand, the payoff will be $55 (thousand). The figures in parentheses on branches leaving the chance nodes indicate the probabilities of those states of nature. Hence, the probability of low demand is .4, and the probability of high demand is .6. Payoffs in parentheses indicate losses.

Analyze the decisions from right to left:

1. Determine which alternative would be selected for each possible second decision. For a small facility with high demand, there are three choices: do nothing, work overtime, and expand. Because expand has the highest payoff, you would choose it. Indicate this by placing a double slash through each of the other alternatives. Similarly, for a large facility with low demand, there are two choices: do nothing and reduce prices. You would choose reduce prices because it has the higher expected value, so a double slash is placed on the other branch.

ste24102_ch05s_216-235.indd 222ste24102_ch05s_216-235.indd 222 11/28/13 11:45 PM11/28/13 11:45 PM

Final PDF to printer

Supplement to Chapter Five Decision Theory 223

2. Determine the product of the chance probabilities and their respective payoffs for the remaining branches:

Build small

Low demand .4($40)  �  $16

High demand .6($55)  �  $33

Build large

Low demand .4($50)  �  $20

High demand .6($70)  �  $42

3. Determine the expected value of each initial alternative:

Build small $16  �  $33  �  $49

Build large $20  �  $42  �  $62

Hence, the choice should be to build the large facility because it has a larger expected value than the small facility.

5S.8 EXPECTED VALUE OF PERFECT INFORMATION

In certain situations, it is possible to ascertain which state of nature will actually occur in the future. For instance, the choice of location for a restaurant may weigh heavily on whether a new highway will be constructed or whether a zoning permit will be issued. A decision maker may have probabilities for these states of nature; however, it may be possible to delay a deci- sion until it is clear which state of nature will occur. This might involve taking an option to buy the land. If the state of nature is favorable, the option can be exercised; if it is unfavorable, the option can be allowed to expire. The question to consider is whether the cost of the option will be less than the expected gain due to delaying the decision (i.e., the expected payoff above the expected value). The expected gain is the expected value of perfect information, or EVPI .

Other possible ways of obtaining perfect information depend somewhat on the nature of the decision being made. Information about consumer preferences might come from market research, additional information about a product could come from product testing, or legal experts might be called on.

There are two ways to determine the EVPI. One is to compute the expected payoff under certainty and subtract the expected payoff under risk. That is,

Expected value of perfect information

Expected payoff under certainty

Expected payoff under risk

� � (5S–1)

Expected value of perfect information (EVPI)  The difference between the expected payoff with perfect information and the expected payoff under risk.

E X A M P L E 5 S – 6

S O L U T I O N

Using the information from Example 5S–4, determine the expected value of perfect informa- tion using Formula 5S–1.

First, compute the expected payoff under certainty. To do this, identify the best payoff under each state of nature. Then combine these by weighting each payoff by the probability of that state of nature and adding the amounts. Thus, the best payoff under low demand is $10, the best under moderate demand is $12, and the best under high demand is $16. The expected payoff under certainty is, then,

.30($10) .50($12) .20($16) $12.2� � �

LO5S.6 Compute the expected value of perfect information.

ste24102_ch05s_216-235.indd 223ste24102_ch05s_216-235.indd 223 11/10/13 7:45 PM11/10/13 7:45 PM

Final PDF to printer

224 Supplement to Chapter Five Decision Theory

The expected payoff under risk, as computed in Example 5S–4, is $10.5. The EVPI is the dif- ference between these:

EVPI $12.2 $10.5 $1.7� � �

This figure indicates the upper limit on the amount the decision maker should be willing to spend to obtain perfect information in this case. Thus, if the cost equals or exceeds this amount, the decision maker would be better off not spending additional money and simply going with the alternative that has the highest expected payoff.

A second approach is to use the regret table to compute the EVPI. To do this, find the expected regret for each alternative. The minimum expected regret is equal to the EVPI.

E X A M P L E 5 S – 7

Determine the expected value of perfect information for the capacity-planning problem using the expected regret approach.

S O L U T I O N Using information from Examples 5S–2, 5S–3, and 5S–4, we can compute the expected regret for each alternative. Thus:

Small facility Medium facility Large facility

.30(0)

.30(3)

.30(14)

.50(2)

.50(0)

.50(10)

.20(6) 2.2

.20(4) 1.7 [minimum]

.20(0) 9.2

� � �

� � �

� � �

The lowest expected regret is 1.7, which is associated with the second alternative. Hence, the EVPI is $1.7 million, which agrees with the previous example using the other approach.

5S.9 SENSITIVITY ANALYSIS Generally speaking, both the payoffs and the probabilities in this kind of a decision problem are estimated values. Consequently, it can be useful for the decision maker to have some indication of how sensitive the choice of an alternative is to changes in one or more of these values. Unfortunately, it is impossible to consider all possible combinations of every variable in a typical problem. Nevertheless, there are certain things a decision maker can do to judge the sensitivity of probability estimates.

Sensitivity analysis provides a range of probability over which the choice of alternatives would remain the same. The approach illustrated here is useful when there are two states of nature. It involves constructing a graph and then using algebra to determine a range of prob- abilities for which a given solution is best. In effect, the graph provides a visual indication of the range of probability over which the various alternatives are optimal, and the algebra provides exact values of the endpoints of the ranges. Example 5S–8 illustrates the procedure.

Sensitivity analysis  Deter- mining the range of probability for which an alternative has the best expected payoff.

Given the following table, determine the range of probability for state of nature #2, that is, P (2), for which each alternative is optimal under the expected-value approach.

STATE OF NATURE

#1 #2

A 4 12 Alternative B 16 2 C 12 8

E X A M P L E 5 S – 8

S O L U T I O N First, plot each alternative relative to P (2). To do this, plot the #1 value on the left side of the graph and the #2 value on the right side. For instance, for alternative A, plot 4 on the left side of the graph and 12 on the right side. Then connect these two points with a straight line. The three alternatives are plotted on the graph as shown on the next page.

e celx mhhe.com/stevenson12e

e celx mhhe.com/stevenson12e

LO5S.7 Conduct sensitivity analysis on a simple decision problem.

ste24102_ch05s_216-235.indd 224ste24102_ch05s_216-235.indd 224 11/10/13 7:45 PM11/10/13 7:45 PM

Final PDF to printer

Supplement to Chapter Five Decision Theory 225

The graph shows the range of values of P (2) over which each alternative is optimal. Thus, for low values of P (2) [and thus high values of P (1), since P (1)  �   P (2)  �  1.0], alternative B will have the highest expected value; for intermediate values of P (2), alternative C is best; and for higher values of P (2), alternative A is best.

To find exact values of the ranges, determine where the upper parts of the lines intersect. Note that at the intersections, the two alternatives represented by the lines would be equivalent in terms of expected value. Hence, the decision maker would be indifferent between the two at that point. To determine the intersections, you must obtain the equation of each line. This is relatively simple to do. Because these are straight lines, they have the form y   �   a   �   bx, where a is the y -intercept value at the left axis, b is the slope of the line, and x is P (2). Slope is defined as the change in y for a one-unit change in x. In this type of problem, the distance between the two vertical axes is 1.0. Consequently, the slope of each line is equal to the right- hand value minus the left-hand value. The slopes and equations are as follows:

#1 #2 Slope Equation

A 4 12 12  � 4 � � 8 4  �  8 P (2) B 16 2 2 � 16 � � 14 16  �  14 P (2) C 12 8 8 � 12 � � 4 12  �  4 P (2)

From the graph, we can see that alternative B is best from P (2) 5 0 to the point where that straight line intersects the straight line of alternative C, and that begins the region where C is better. To find that point, solve for the value of P (2) at their intersection. This requires setting the two equations equal to each other and solving for P (2). Thus,

P P16 14 (2) 12 4 (2)� � � Rearranging terms yields

P4 10 (2)� Solving yields P (2)  �  .40. Thus, alternative B is best from P (2)  �  0 up to P (2)  �  .40. B

and C are equivalent at P (2)  �  .40. Alternative C is best from that point until its line intersects alternative A’s line. To find that

intersection, set those two equations equal and solve for P (2). Thus,

P P4 8 (2) 12 4 (2)� � � Rearranging terms results in

P12 (2) 8� Solving yields P (2)  �  .67. Thus, alternative C is best from P (2) > .40 up to P (2)  �  .67,

where A and C are equivalent. For values of P (2) greater than .67 up to P (2)  �  1.0, A is best.

Note: If a problem calls for ranges with respect to P (1), find the P (2) ranges as above, and then subtract each P (2) from 1.00 (e.g., .40 becomes .60, and .67 becomes .33).

16

14

12

10

8

6

4

2

0 1.0.8.6.4.2

#1 Payoff

16

14

12

10

8

6

4

2

#2 Payoff

B

C A

P (2)

B best A bestC best

ste24102_ch05s_216-235.indd 225ste24102_ch05s_216-235.indd 225 11/10/13 7:45 PM11/10/13 7:45 PM

Final PDF to printer

226 Supplement to Chapter Five Decision Theory

Decision making is an integral part of operations management. Decision theory is a general approach to decision making that is useful in many different aspects of

operations management. Decision theory provides a framework for the analysis of decisions. It includes a number of techniques that can be classified according to the degree of uncertainty associated with a particular decision problem. Two visual tools useful for analyzing some decision problems are decision trees and graphical sensitivity analysis.

SUMMARY

bounded rationality, 218 certainty, 218 decision tree, 221 expected monetary value (EMV) criterion, 220 expected value of perfect information (EVPI), 223

Laplace, 219 maximax, 219 maximin, 219 minimax regret, 219 payoff table, 217 regret (opportunity loss), 220

risk, 218 sensitivity analysis, 224 suboptimization, 218 uncertainty, 218

KEY TERMS

SOLVED PROBLEMS

Assume the payoffs represent profits. Determine the alternative that would be chosen under each of these decision criteria:

a. Maximin.

b. Maximax.

c. Laplace.

Problem 1

The following solved problems refer to this payoff table:

where A � small, B � medium, and C � large.

New Bridge Built

No New

Bridge

Alternative capacity for new store

A 1 14

B 2 10

C 4 6

Solution

Thus, the alternatives chosen would be C under maximin, A under maximax, and A under Laplace.

Problem 2 Using graphical sensitivity analysis, determine the probability for no new bridge for which each alternative would be optimal.

New Bridge

No New Bridge

Maximin (worst)

Maximax (best)

Laplace (average)

A 1 14 1 14 [best] 15  �  2  �  7.5 [best]

B 2 10 2 10 12  �  2  �  6

C 4 6 4 [best]   6 10  �  2  �  5

Solution Plot a straight line for each alternative. Do this by plotting the payoff for new bridge on the left axis and the payoff for no new bridge on the right axis and then connecting the two points. Each line represents the expected profit for an alternative for the entire range of probability of no new bridge. Because the lines represent expected profit, the line that is highest for a given value of P (no new bridge) is optimal. Thus, from the graph, you can see that for low values of this probability, alterna- tive C is best, and for higher values, alternative A is best (B is never the highest line, so it is never optimal).

e celx mhhe.com/stevenson12e

e celx mhhe.com/stevenson12e

ste24102_ch05s_216-235.indd 226ste24102_ch05s_216-235.indd 226 11/10/13 7:45 PM11/10/13 7:45 PM

Final PDF to printer

Supplement to Chapter Five Decision Theory 227

Worst

A 3 [best]

B 4

C 8

New Bridge

No New Bridge

A 3 0

B 2 4

C 0 8

The dividing line between the ranges where C and A are optimal occurs where the two lines inter- sect. To find that probability, first formulate the equation for each line. To do this, let the intersection with the left axis be the y intercept; the slope equals the right-side payoff minus the left-side payoff. Thus, for C you have 4  �  (6  �  4) P, which is 4  �  2 P. For A, 1  �  (14  �  1) P, which is 1  �  13 P. Setting these two equal to each other, you can solve for P:

P P4 2 1 13� � �

Solving, P   �  .27. Therefore, the ranges for P (no new bridge) are

A: .27 � P � 1.00

B: never optimal

C: 0 � P � .27

Problem 3 Using the information in the payoff table, develop a table of regrets, and then a. Determine the alternative that would be chosen under minimax regret.

b. Determine the expected value of perfect information using the regret table, assuming that the probability of a new bridge being built is .60.

Solution To obtain the regrets, subtract all payoffs in each column from the best payoff in the column. The regrets are

a. Minimax regret involves finding the worst regret for each alternative and then choosing the alter- native that has the “best” worst. Thus, you would choose A:

4

2

1

0 1.0

Payoff for new bridge 14

10

6

0

Payoff for no new bridge

A

A bestC best

B

C

.27 P (no new bridge)

e celx mhhe.com/stevenson12e

ste24102_ch05s_216-235.indd 227ste24102_ch05s_216-235.indd 227 11/10/13 7:45 PM11/10/13 7:45 PM

Final PDF to printer

228 Supplement to Chapter Five Decision Theory

b. Once the regret table has been developed, you can compute the EVPI as the smallest expected regret. Since the probability of a new bridge is given as .60, we can deduce that the probability of no new bridge is 1.00  �  .60  �  .40. The expected regrets are

A: .60(3)  �  .40(0)  �  1.80

B: .60(2)  �  .40(4)  �  2.80

C: .60(0)  �  .40(8)  �  3.20

Hence, the EVPI is 1.80.

Problem 4 Using the probabilities of .60 for a new bridge and .40 for no new bridge, a. Compute the expected value of each alternative in the payoff table, and identify the alternative

that would be selected under the expected-value approach.

b. Construct a decision tree for the problem showing expected values.

Solution

Problem 5

a. A: .60(1)  �  .40(14)  �  6.20 [best]

B: .60(2)  �  .40(10)  �  5.20

C: .60(4)  �  .40(6)  �  4.80

b.

Compute the EVPI using the information from the previous problem.

C

B

A

Ne w b

rid ge

(.60 )

New bri

dge (.60

)

New brid

ge (. 60)

No new bridge (.40)

No new bridge (.40)

No new bridge (.40)

Expected values

.60(1) = .60

$6.20 (best)

$5.20

$4.80

.40(14) = 5.60

.60(2) = 1.20

.40(10) = 4.00

.60(4) = 2.40

.40(6) = 2.40

$1

$14

$2

$ 10

$4

$6

Solution Using Formula 5S–1, the EVPI is the expected payoff under certainty minus the maximum expected value. The expected payoff under certainty involves multiplying the best payoff in each column by

e celx mhhe.com/stevenson12e

ste24102_ch05s_216-235.indd 228ste24102_ch05s_216-235.indd 228 11/10/13 7:45 PM11/10/13 7:45 PM

Final PDF to printer

Supplement to Chapter Five Decision Theory 229

the column probability and then summing those amounts. The best payoff in the first column is 4, and the best in the second is 14. Thus,

Expected payoff under certainty .60(4) .40(14) 8.00� � �

Then

EVPI 8.00 6.20 1.80� � �

(This agrees with the result obtained in Solved Problem 3 b. )

Excel solution:

Placing the problem data in the cell positions shown, the expected monetary value (EMV) for each alternative is shown in column J.

Then, the overall EMV is obtained in column L as the maximum of the values in L5, L6, and L7. The EVPI is obtained using the Opportunity Loss Table as the minimum EOL value in J14, J15,

and J16.

Problem 6 Suppose that the values in the payoff table represent costs instead of profits. a. Determine the choice that you would make under each of these strategies: maximin, minimin, and

Laplace.*

b. Develop the regret table, and identify the alternative chosen using minimax regret. Then find the EVPI if P (new bridge)  �  .60.

c. Using sensitivity analysis, determine the range of P (no new bridge) for which each alternative would be optimal.

d. If P (new bridge)  �   .60 and P (no new bridge)  �   .40, find the alternative chosen to minimize expected cost.

* Minimin is the reverse of maximax; for costs, minimin identifies the lowest (best) cost.

e celx mhhe.com/stevenson12e

ste24102_ch05s_216-235.indd 229ste24102_ch05s_216-235.indd 229 11/28/13 11:43 PM11/28/13 11:43 PM

Final PDF to printer

230 Supplement to Chapter Five Decision Theory

Solution New

Bridge No New Bridge

Maximin (worst)

Minimin (best)

Laplace (average)

A 1 14 14 1 [best] 15  �  2  �  7.5

B 2 10 10 2 12  �  2  �  6

C 4 6 6 [best] 4 10  �  2  �  5 [best]

a.

b. Develop the regret table by subtracting the lowest cost in each column from each of the values in the column. (Note that none of the values is negative.)

c. The graph is identical to that shown in Solved Problem 2. However, the lines now represent expected costs, so the best alternative for a given value of P (no new bridge) is the lowest line. Hence, for very low values of P (no new bridge), A is best; for intermediate values, B is best; and for high values, C is best. You can set the equations of A and B, and B and C, equal to each other in order to determine the values of P (no new bridge) at their intersections. Thus,

P P P

P P P

A B: 1 13 2 8 ; solving, .20

B C: 2 8 4 2 ; solving, .33

� � � � �

� � � � �

Hence, the ranges are

A best: 0 #  P  , .20

B best: .20 ,  P  , .33

C best: .33 ,  P  # 1.00

4

2

1

0 1.0

Cost with new bridge 14

10

6

0

Cost with no new bridge

A

C best

B

C

.20 P (no new bridge)

.33

B best

A best

d. Expected-value computations are the same whether the values represent costs or profits. Hence, the expected payoffs for costs are the same as the expected payoffs for profits that were computed in Solved Problem 4. However, now you want the alternative that has the lowest expected payoff rather than the one with the highest payoff. Consequently, alternative C is the best because its expected payoff is the lowest of the three. Alternatively, the best choice (C) could be determined using the sensitivity ranges found in part c since .40 lies in the range .33 to 1.0.

New

Bridge No New Bridge Worst

A 0 8 8

B 1 4 4

C 3 0 3 [best]

EVPI � .60(3) � .40(0) � 1.80

ste24102_ch05s_216-235.indd 230ste24102_ch05s_216-235.indd 230 11/10/13 7:45 PM11/10/13 7:45 PM

Final PDF to printer

Supplement to Chapter Five Decision Theory 231

1. A small building contractor has recently experienced two successive years in which work opportu- nities exceeded the firm’s capacity. The contractor must now make a decision on capacity for next year. Estimated profits under each of the two possible states of nature are as shown in the table below. Which alternative should be selected if the decision criterion is a. Maximax? b. Maximin? c. Laplace? d. Minimax regret?

2. Refer to Problem 1. Suppose after a certain amount of discussion, the contractor is able to subjec- tively assess the probabilities of low and high demand: P (low) � .3 and P (high) � .7. a. Determine the expected profit of each alternative. Which alternative is best? Why? b. Analyze the problem using a decision tree. Show the expected profit of each alternative on the tree. c. Compute the expected value of perfect information. How could the contractor use this

knowledge?

3. Refer to Problems 1 and 2. Construct a graph that will enable you to perform sensitivity analy- sis on the problem. Over what range of P (high) would the alternative of doing nothing be best? Expand? Subcontract?

4. A firm that plans to expand its product line must decide whether to build a small or a large facility to produce the new products. If it builds a small facility and demand is low, the net present value after deducting for building costs will be $400,000. If demand is high, the firm can either maintain the small facility or expand it. Expansion would have a net present value of $450,000, and main- taining the small facility would have a net present value of $50,000.

PROBLEMS

1. What is the chief role of the operations manager?

2. List the steps in the decision-making process.

3. Explain the term bounded rationality.

4. Explain the term suboptimization.

5. What are some of the reasons for poor decisions?

6. What information is contained in a payoff table?

7. What is sensitivity analysis, and how can it be useful to a decision maker?

8. Contrast maximax and maximin decision strategies. Under what circumstances is each appropriate?

9. Under what circumstances is expected monetary value appropriate as a decision criterion? When isn’t it appropriate?

10. Explain or define each of these terms: a. Laplace criterion. b. Minimax regret. c. Expected value. d. Expected value of perfect information.

11. What information does a decision maker need in order to perform an expected-value analysis of a problem? What options are available to the decision maker if the probabilities of the states of nature are unknown? Can you think of a way you might use sensitivity analysis in such a case?

12. Suppose a manager is using maximum EMV as a basis for making a capacity decision and, in the process, obtains a result in which there is a virtual tie between two of the seven alternatives. How is the manager to make a decision?

13. Identify three potential unethical actions or inactions related to decision analysis and the ethical principle each violates (see Chapter 1).

DISCUSSION AND REVIEW QUESTIONS

NEXT YEAR’S DEMAND

Alternative Low High

Do nothing $50 * $60

Expand 20 80

Subcontract 40 70

*Profit in $ thousands.

ste24102_ch05s_216-235.indd 231ste24102_ch05s_216-235.indd 231 11/10/13 7:45 PM11/10/13 7:45 PM

Final PDF to printer

232 Supplement to Chapter Five Decision Theory

If a large facility is built and demand is high, the estimated net present value is $800,000. If demand turns out to be low, the net present value will be � $10,000.

The probability that demand will be high is estimated to be .60, and the probability of low demand is estimated to be .40.

a. Analyze using a tree diagram. b. Compute the EVPI. How could this information be used? c. Determine the range over which each alternative would be best in terms of the value of P

(demand low).

5. Determine the course of action that has the highest expected payoff for this decision tree.

Su bc

on tra

ct

Expand Sm

all d ema

nd ( .4)

Large demand (.1)

Sma ll dem

and (.4)

Medium demand (.5) Large dem and (.1)

Medium demand (.5)

Med ium

dem and

(.5)

Large demand (.1)

Do n othin

g

* Net present value in millions

Other use #2

Do n othin

g

Other use #1

Other use #2

Do n othin

g

Subcontract

Build

Do n othin

g

Other use #1

Other use #2

Do n othin

g

Expand

Build

Do n othin

g

Expand

$1.0*

$1.3

$1.3

$1.5

$1.6

$1.8

$0.7

$1.5

$1.0

$1.6

$1.6

$1.5

$1.7

($0.9)

$1.4

$1.0

$1.0

$1.1

$0.9

$2.4

Build

Other use #1

Sm all

de m

an d (

.4)

6. The lease of Theme Park, Inc., is about to expire. Management must decide whether to renew the lease for another 10 years or to relocate near the site of a proposed motel. The town planning board is currently debating the merits of granting approval to the motel. A consultant has estimated the net present value of Theme Park’s two alternatives under each state of nature as shown on the fol- lowing page.

ste24102_ch05s_216-235.indd 232ste24102_ch05s_216-235.indd 232 11/10/13 7:45 PM11/10/13 7:45 PM

Final PDF to printer

Supplement to Chapter Five Decision Theory 233

What course of action would you recommend using? a. Maximax. b. Maximin. c. Laplace. d. Minimax regret.

7. Refer to Problem 6. Suppose that the management of Theme Park, Inc., has decided that there is a .35 probability that the motel’s application will be approved. a. If management uses maximum expected monetary value as the decision criterion, which alter-

native should it choose? b. Represent this problem in the form of a decision tree. c. If management has been offered the option of a temporary lease while the town planning board

considers the motel’s application, would you advise management to sign the lease? The lease will cost $24,000.

8. Construct a graph that can be used for sensitivity analysis for the preceding problem. a. How sensitive is the solution to the problem in terms of the probability estimate of .35? b. Suppose that, after consulting with a member of the town planning board, management decides

that an estimate of approval is approximately .45. How sensitive is the solution to this revised estimate? Explain.

c. Suppose the management is confident of all the estimated payoffs except for $4 million. If the probability of approval is .35, for what range of payoff for renew/reject will the alternative selected using the maximum expected value remain the same?

9. A firm must decide whether to construct a small, medium, or large stamping plant. A consultant’s report indicates a .20 probability that demand will be low and an .80 probability that demand will be high.

If the firm builds a small facility and demand turns out to be low, the net present value will be $42 million. If demand turns out to be high, the firm can either subcontract and realize the net present value of $42 million or expand greatly for a net present value of $48 million.

The firm could build a medium-size facility as a hedge: If demand turns out to be low, its net present value is estimated at $22 million; if demand turns out to be high, the firm could do nothing and realize a net present value of $46 million, or it could expand and realize a net present value of $50 million.

If the firm builds a large facility and demand is low, the net present value will be �$20 million, whereas high demand will result in a net present value of $72 million. a. Analyze this problem using a decision tree. b. What is the maximin alternative? c. Compute the EVPI and interpret it. d. Perform sensitivity analysis on P (high).

10. A manager must decide how many machines of a certain type to buy. The machines will be used to manufacture a new gear for which there is increased demand. The manager has narrowed the decision to two alternatives: buy one machine or buy two. If only one machine is purchased and demand is more than it can handle, a second machine can be purchased at a later time. However, the cost per machine would be lower if the two machines were purchased at the same time.

The estimated probability of low demand is .30, and the estimated probability of high demand is .70.

The net present value associated with the purchase of two machines initially is $75,000 if demand is low and $130,000 if demand is high.

The net present value for one machine and low demand is $90,000. If demand is high, there are three options. One option is to do nothing, which would have a net present value of $90,000. A second option is to subcontract; that would have a net present value of $110,000. The third option is to purchase a second machine. This option would have a net present value of $100,000.

How many machines should the manager purchase initially? Use a decision tree to analyze this problem.

Options Motel

Approved Motel

Rejected

Renew $ 500,000 $4,000,000

Relocate 5,000,000 100,000

ste24102_ch05s_216-235.indd 233ste24102_ch05s_216-235.indd 233 11/10/13 7:45 PM11/10/13 7:45 PM

Final PDF to printer

234 Supplement to Chapter Five Decision Theory

11. Determine the course of action that has the highest EMV for the accompanying tree diagram.

45

(45)

99

40

50

30

1/3 1/3 1/3

40

50

1/2

1/2

.30

.20

.50

.30

.20

.50

60

0

90

40

44

60

1/3 1/3 1/3

Alte rna

tive A

Alternative B

12. A logistics provider plans to have a new warehouse built to handle increasing demands for its services. Although the company is unsure of how much demand there will be, it must decide now on the size (large or small) of the warehouse. Preliminary estimates are that if a small warehouse is built and demand is low, the monthly income will be $700,000. If demand is high, it will have to either expand the facility or lease additional space. Leasing will result in a monthly income of $100,000 while expanding will result in a monthly income of $500,000.

If a large warehouse is built and demand is low, monthly income will only be $40,000, while if demand is high, monthly income will be $2 million. a. Construct a tree diagram for this decision. b. Using your tree diagram, identify the choice that would be made using each of the four

approaches for decision making under uncertainty.

13. The director of social services of a county has learned that the state has mandated additional information requirements. This will place an additional burden on the agency. The director has identified three acceptable alternatives to handle the increased workload. One alternative is to reassign present staff members, the second is to hire and train two new workers, and the third is to redesign current practice so that workers can readily collect the information with little additional effort. An unknown factor is the caseload for the coming year when the new data will be collected on a trial basis. The estimated costs for various options and caseloads are shown in the following table:

CASELOAD

Moderate High Very High

Reassign staff $50* 60 85 New staff 60 60 60 Redesign collection 40 50 90 *Cost in $ thousands.

Assuming that past experience has shown the probabilities of various caseloads to be unreliable, what decision would be appropriate using each of the following criteria? a. Maximin. b. Maximax. c. Minimax regret. d. Laplace.

ste24102_ch05s_216-235.indd 234ste24102_ch05s_216-235.indd 234 11/9/13 12:31 PM11/9/13 12:31 PM

Final PDF to printer

Supplement to Chapter Five Decision Theory 235

16. A manager has compiled estimated profits for various capacity alternatives but is reluctant to assign probabilities to the states of nature. The payoff table is as follows:

Receive Contract

Not Receive Contract

#1 $10 * 22

Proposal #2 8 3

#3 5 5

#4 0 7

*Cost in $ thousands.

STATE OF NATURE

#1 #2

A $20 * 140

Alternative B 120 80

C 100 40

*Profit in $ thousands.

a. Plot the expected-value lines on a graph. b. Is there any alternative that would never be appropriate in terms of maximizing expected

profit? Explain on the basis of your graph. c. For what range of P (2) would alternative A be the best choice if the goal is to maximize

expected profit? d. For what range of P (1) would alternative A be the best choice if the goal is to maximize

expected profit?

17. Repeat all parts of Problem 16, assuming the values in the payoff table are estimated costs and the goal is to minimize expected costs.

18. The research staff of a marketing agency has assembled the following payoff table of estimated profits:

Relative to the probability of not receiving the contract, determine the range of probability for which each of the proposals would maximize expected profit.

Anderson, David R., Dennis J. Sweeney, Thomas A. Williams, Jeffrey D. Camm, and R. Kipp Martin. An Introduction to Management Science, 13th ed. Mason, OH: South-Western, 2010.

Stevenson, William J., and Ceyhun Ozgur. Introduction to Management Science with Spreadsheets. New York: McGraw-Hill Irwin, 2007.

Taylor, Bernard W. Introduction to Management Science. 11th ed. Dubuque, IA: William C. Brown, 2013.

SELECTED BIBLIOGRAPHY AND FURTHER

READINGS

14. After contemplating the caseload question (see previous problem), the director of social services has decided that reasonable caseload probabilities are .10 for moderate, .30 for high, and .60 for very high. a. Which alternative will yield the minimum expected cost? b. Construct a decision tree for this problem. Indicate the expected costs for the three decision

branches. c. Determine the expected value of perfect information using an opportunity loss table.

STATE OF NATURE

#1 #2

A $120* 20

Alternative B 60 40

C 10 110

D 90 90

*Payoff in $ thousands.

a. Determine the range of P (1) for which each alternative would be best, treating the payoffs as profits.

b. Answer part a treating the payoffs as costs.

15. Given this payoff table:

ste24102_ch05s_216-235.indd 235ste24102_ch05s_216-235.indd 235 11/9/13 12:31 PM11/9/13 12:31 PM

Final PDF to printer

236

C H A P T E R

6 CHAPTER OUTLINE

6.1 Introduction, 237

6.2 Process Selection, 238 Process Types, 238

Operations Tour: Morton Salt, 242

Product and Service Profiling, 244

Sustainable Production of Goods and Services, 244

Lean Process Design, 244

6.3 Technology, 244 Automation, 245

6.4 Process Strategy, 249

6.5 Strategic Resource Organization: Facilities Layout, 250

Repetitive Processing: Product Layouts, 250

Nonrepetitive Processing: Process Layouts,  253

Fixed-Position Layouts, 254

Combination Layouts, 255

Cellular Layouts, 256

Service Layouts, 258

6.6 Designing Product Layouts: Line Balancing,  262 Some Guidelines for Line Balancing, 266

Other Factors, 269

Other Approaches, 269

6.7 Designing Process Layouts, 271 Measures of Effectiveness, 271

Information Requirements, 272

Minimizing Transportation Costs or Distances, 272

Closeness Ratings, 273

Process Selection and Facility Layout

After completing this chapter, you should be able to:

LO6.1 Explain the strategic importance of process selection and the influence it has on the organization and its supply chain.

LO6.2 Name the two main factors that influence process selection.

LO6.3 Compare the four basic processing types.

LO6.4 Explain the need for management of technology.

LO6.5 List some reasons for redesign of layouts.

LO6.6 Describe product layouts and their main advantages and disadvantages.

LO6.7 Describe process layouts and their main advantages and disadvantages.

LO6.8 Solve simple line-balancing problems.

LO6.9 Develop simple process layouts.

LEARNING OBJECTIVES

ste24102_ch06_236-287.indd 236ste24102_ch06_236-287.indd 236 11/1/13 12:20 PM11/1/13 12:20 PM

Final PDF to printer

237

Product and service choices, capacity planning, process selection, and layout of facilities are among the most basic decisions managers make because they have long-term consequences for business organizations, and they impact a wide range of activi- ties and capabilities.

This chapter is about process selection and facility layout (i.e., the arrangement of the workplace). Processes convert inputs into outputs; they are at the core of operations management. But the impact of process selection goes beyond operations man- agement: It affects the entire organization and its ability to achieve its mission, and it affects the organization’s supply chain. So process selection choices very often have strategic significance. Different process types have different capacity ranges, and once a process type is functioning, changing it can be difficult, time consuming, and costly. Obviously, long-term forecasts as well as an organization’s mission and goals are important in developing a process strategy.

Process selection has operational and supply chain implications. Operational implications include equipment and labor requirements, operations costs, and both the ability to meet demand and the ability to respond to variations in demand. Supply chain implications relate to the volume and variety of inputs and outputs and the degree of flexibility that is required.

Technology is often a factor in process selection and layout. Three aspects of technology can be factors: product technology, processing technology, and information technology.

Process selection and facility layout are closely tied, and for that reason, these two topics are presented in a single chapter. The first part of the chapter covers the basic options for processing work. This is followed by a discussion of how processes and layout are linked. The remainder of the chapter is devoted to layout design.

LO6.1 Explain the strategic importance of process selec- tion and the influence it has on the organization and its supply chain.

6.1 INTRODUCTION Process selection refers to deciding on the way production of goods or services will be orga- nized. It has major implications for capacity planning, layout of facilities, equipment, and design of work systems. Process selection occurs as a matter of course when new products or services are being planned. However, it also occurs periodically due to technological changes in products or equipment, as well as competitive pressures. Figure 6.1 provides an overview

ste24102_ch06_236-287.indd 237ste24102_ch06_236-287.indd 237 11/1/13 12:20 PM11/1/13 12:20 PM

Final PDF to printer

238 Chapter Six Process Selection and Facility Layout

of where process selection and capacity planning fit into system design. Forecasts, product and service design, and technological considerations all influence capacity planning and pro- cess selection. Moreover, capacity and process selection are interrelated, and are often done in concert. They, in turn, affect facility and equipment choices, layout, and work design.

How an organization approaches process selection is determined by the organization’s process strategy. Key aspects include

• Capital intensity: the mix of equipment and labor that will be used by the organization.

• Process flexibility: the degree to which the system can be adjusted to changes in processing requirements due to such factors as changes in product or service design, changes in volume processed, and changes in technology.

6.2 PROCESS SELECTION Process choice is demand driven. The two key questions in process selection are:

1. How much variety will the process need to be able to handle?

2. How much volume will the process need to be able to handle?

Answers to these questions will serve as a guide to selecting an appropriate process. Usually, volume and variety are inversely related; a higher level of one means a lower level of the other. However, the need for flexibility of personnel and equipment is directly related to the level of variety the process will need to handle: the lower the variety, the less the need for flexibility, while the higher the variety, the greater the need for flexibility.

There is another aspect of variety that is important. Variety means either having separate operations for each product or service, with a steady demand for each, or being willing to live with some idle time, or to get equipment ready every time there is the need to change the product being produced or the service being provided.

Process Types There are five basic process types: job shop, batch, repetitive, continuous, and project.

Job Shop. A job shop usually operates on a relatively small scale. It is used when a low volume of high-variety goods or services will be needed. Processing is intermittent; work includes small jobs, each with somewhat different processing requirements. High flexibility using general-purpose equipment and skilled workers are important characteristics of a job shop. A manufacturing example of a job shop is a tool and die shop that is able to produce

FIGURE 6.1 Process selection and capacity planning influence system design Forecasting

Product and service design

Technological change

Facilities and equipment

Layout

Work design

Capacity Planning

Process Selection

Inputs Outputs

LO6.2 Name the two main factors that influence process selection.

ste24102_ch06_236-287.indd 238ste24102_ch06_236-287.indd 238 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 239

one-of-a-kind tools. A service example is a veterinarian’s office, which is able to process a variety of animals and a variety of injuries and diseases.

Batch. Batch processing is used when a moderate volume of goods or services is desired, and it can handle a moderate variety in products or services. The equipment need not be as flexible as in a job shop, but processing is still intermittent. The skill level of workers doesn’t need to be as high as in a job shop because there is less variety in the jobs being processed. Examples of batch systems include bakeries, which make bread, cakes, or cookies in batches; movie theaters, which show movies to groups (batches) of people; and airlines, which carry planeloads (batches) of people from airport to airport. Other examples of products that lend themselves to batch production are paint, ice cream, soft drinks, beer, magazines, and books. Other examples of services include plays, concerts, music videos, radio and television pro- grams, and public address announcements.

A job shop process: A midwestern hospital medical team performs a diagnostic procedure involving a cardiac catheterization.

A batch process: Menu items are prepared in batches, in the kitchen of the Spago Restaurant in the Forum at Caesar’s Palace, Las Vegas, Nevada.

A repetitive process: Motorcycles on an assembly line with parts added in a sequential order. A continuous process: An oil refinery performs a continuous

process, mixing and separating crude oil into gas, fuel oil, chemicals, and many other products.

ste24102_ch06_236-287.indd 239ste24102_ch06_236-287.indd 239 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

240 Chapter Six Process Selection and Facility Layout

Repetitive. When higher volumes of more standardized goods or services are needed, repetitive processing is used. The standardized output means only slight flexibility of equip- ment is needed. Skill of workers is generally low. Examples of this type of system include production lines and assembly lines. In fact, this type of process is sometimes referred to as assembly. Familiar products made by these systems include automobiles, television sets, pen- cils, and computers. An example of a service system is an automatic carwash. Other examples of service include cafeteria lines and ticket collectors at sports events and concerts. Also, mass customization is an option.

Continuous. When a very high volume of nondiscrete, highly standardized output is desired, a continuous system is used. These systems have almost no variety in output and, hence, no need for equipment flexibility. Workers’ skill requirements can range from low to high, depending on the complexity of the system and the expertise workers need. Generally, if equip- ment is highly specialized, worker skills can be lower. Examples of nondiscrete products made in continuous systems include petroleum products, steel, sugar, flour, and salt. Continuous ser- vices include air monitoring, supplying electricity to homes and businesses, and the Internet.

These process types are found in a wide range of manufacturing and service settings. The ideal is to have process capabilities match product or service requirements. Failure to do so can result in inefficiencies and higher costs than are necessary, perhaps creating a competitive disadvantage. Table 6.1 provides a brief description of each process type along with advan- tages and disadvantages of each.

Figure 6.2 provides an overview of these four process types in the form of a matrix, with an example for each process type. Note that job variety, process flexibility, and unit cost are highest for a job shop and get progressively lower moving from job shop to continuous pro- cessing. Conversely, volume of output is lowest for a job shop and gets progressively higher moving from job shop to continuous processing. Note, too, that the examples fall along the diagonal. The implication is that the diagonal represents the ideal choice of processing sys- tem for a given set of circumstances. For example, if the goal is to be able to process a small volume of jobs that will involve high variety, job shop processing is most appropriate. For less variety and a higher volume, a batch system would be most appropriate, and so on. Note that combinations far from the diagonal would not even be considered, such as using a job shop for high-volume, low-variety jobs, or continuous processing for low-volume, high-variety jobs, because that would result in either higher than necessary costs or lost opportunities.

Another consideration is that products and services often go through life cycles that begin with low volume, which increases as products or services become better known. When that

LO6.3 Compare the four basic processing types.

Job Shop Batch Repetitive/ Assembly Continuous

Description Customized goods or services

Semi- standardized goods or services

Standardized goods or services

Highly standardized goods or services

Advantages Able to handle a wide variety of work

Flexibility; easy to add or change products or services

Low unit cost, high volume, efficient

Very efficient, very high volume

Disadvantages Slow, high cost per unit, complex planning and scheduling

Moderate cost per unit, moderate scheduling complexity

Low flexibility, high cost of downtime

Very rigid, lack of variety, costly to change, very high cost of downtime

TABLE 6.1 Types of processing

ste24102_ch06_236-287.indd 240ste24102_ch06_236-287.indd 240 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 241

happens, a manager must know when to shift from one type of process (e.g., job shop) to the next (e.g., batch). Of course, some operations remain at a certain level (e.g., magazine pub- lishing), while others increase (or decrease as markets become saturated) over time. Again, it is important for a manager to assess his or her products and services and make a judgment on whether to plan for changes in processing over time.

All of these process types (job shop, batch, repetitive, and continuous) are typically ongo- ing operations. However, some situations are not ongoing but instead are of limited duration. In such instances, the work is often organized as a project.

Project. A project is used for work that is nonroutine, with a unique set of objectives to be accomplished in a limited time frame. Examples range from simple to complicated, including such things as putting on a play, consulting, making a motion picture, launching a new prod- uct or service, publishing a book, building a dam, and building a bridge. Equipment flexibility and worker skills can range from low to high.

The type of process or processes used by an organization influences a great many activities of the organization. Table 6.2 briefly describes some of those influences.

Project  A nonrepetitive set of activities directed toward a unique goal within a limited time frame.

FIGURE 6.2 Volume and variety influence process choice

Repetitive assembly line automatic car wash

Continuous Flow petroleum refining water treatment

Low or very low volume

Moderate volume

High volume

Very high volume

Low variety Very low varietyHigh variety Moderate variety

Job Shop repair shop emergency room

Batch commercial bakery classroom lecture

Activity/ Function Job Shop Batch Repetitive Continuous Projects

Cost estimation Difficult Somewhat routine Routine Routine Simple to complex Cost per unit High Moderate Low Low Very high Equipment used General purpose General purpose Special purpose Special purpose Varied Fixed costs Low Moderate High Very high Varied Variable costs High Moderate Low Very low High Labor skills High Moderate Low Low to high Low to high Marketing Promote

capabilities Promote capabilities; semi-

standardized goods and services

Promote standardized goods/services

Promote standardized goods/services

Promote capabilities

Scheduling Complex Moderately complex Routine Routine Complex, subject to change

Work-in-process inventory

High High Low Low Varied

TABLE 6.2 Process choice affects numerous activities/functions

ste24102_ch06_236-287.indd 241ste24102_ch06_236-287.indd 241 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

242 Chapter Six Process Selection and Facility Layout

Process type also impacts supply chain requirements. Repetitive and continuous pro- cesses require steady inputs of high-volume goods and services. Delivery reliability in terms of quality and timing is essential. Job shop and batch processing may mean that suppliers have to be able to deal with varying order quantities and timing of orders. In some instances seasonality is a factor, so suppliers must be able to handle periodic large demand.

The processes discussed do not always exist in their “pure” forms. It is not unusual to find hybrid processes—processes that have elements of other process types embedded in them. For instance, companies that operate primarily in a repetitive mode, or a continuous mode, will often have repair shops (i.e., job shops) to fix or make new parts for equipment that fails. Also, if volume increases for some items, an operation that began, say, in a job shop or as a batch mode may evolve into a batch or repetitive operation. This may result in having some operations in a job shop or batch mode, and others in a repetitive mode.

Introduction Morton Salt is a subsidiary of Morton International, a manufacturer of specialty chemicals, air bags, and salt products. The Morton salt- processing facility in Silver Springs, New York, between Buffalo and Rochester, is one of six similar Morton salt-processing facilities in the United States. The Silver Springs plant employs about 200 people, ranging from unskilled to skilled. It produces salt products for water conditioning, grocery, industrial, and agricultural markets. The grocery business consists of 26-oz. round cans of iodized salt. Although the gro- cery business represents a relatively small portion of the total output (approximately 15 percent), it is the most profitable.

Salt Production The basic raw material, salt, is obtained by injecting water into salt cav- erns that are located some 2,400 feet below the surface. There, the salt deposits dissolve in the water. The resulting brine is pumped to the surface where it is converted into salt crystals. The brine is boiled, and much of the liquid evaporates, leaving salt crystals and some residual moisture, which is removed in a drying process. This process is run continuously for about six weeks at a time. Initially, salt is produced at the rate of 45 tons per hour. But the rate of output decreases due to scale buildup, so that by the sixth week, output is only 75 percent of the initial rate. At that point, the process is halted to perform maintenance on the equipment and remove the scale, after which salt production resumes.

The salt is stored in silos until it is needed for production, or it is shipped in bulk to industrial customers. Conveyors move the salt to each of the four dedicated production areas, one of which is round can production. (See diagram.) The discussion here focuses exclusively on round can production.

Round Can Production Annual round can production averages roughly 3.8 million cans. Approx- imately 70 percent of the output is for the Morton label, and the rest is

for private label. There are two parallel, high-speed production lines. The two lines share common pro- cesses at the beginning of the lines, and then branch out into two identi- cal lines. Each line is capable of producing 9,600 cans per hour (160 cans per minute). The equipment is not flexible, so the production rate is fixed. The operations are completely standardized; the only variable is the brand label that is applied. One line requires 12 production workers, while both lines together can be operated by 18 workers because of the common processes. Workers on the line perform low-skilled, repetitive tasks.

The plant produces both the salt and the cans the salt is packaged in. The cans are essentially a cylinder with a top and a bottom; they are made of cardboard, except for a plastic pour spout in the top. The cylinder portion is formed from two sheets of chip board that are glued together and then rolled into a continuous tube. The glue not only binds the material, it also provides a moisture barrier. The tube is cut in a two-step process: it is first cut into long sections, and those sections are then cut into can-size pieces. The top and bottom pieces for the cans are punched from a continuous strip of cardboard. The separate pieces move along conveyor belts to the lines where the components are assembled into cans and glued. The cans are then filled with salt and the pour spout is added. Finally, the cans are loaded onto pallets and placed into inventory, ready to be shipped to distributors.

Quality Quality is checked at several points in the production process. Initially, the salt is checked for purity when it is obtained from the wells. Iodine and an anti-caking compound are added to the salt, and their levels are verified using chemical analysis. Crystal size is important. In order to achieve the desired size and to remove lumps, the salt is forced through a scraping screen, which can cause very fine pieces of metal to mix with the salt. However, these pieces are effectively removed by magnets that are placed at appropriate points in the process. If, for any reason, the salt is judged to be contaminated, it is diverted to a nonfood product.

OPERATIONS TOUR Morton Salt

h t i t t id ti

(continued)

ste24102_ch06_236-287.indd 242ste24102_ch06_236-287.indd 242 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 243

Water supply

Wells

Screens

Blocks

Bags

Conveyors

Filters

Dryer

Silos

Elevator

Brine storage

Pellet press

Block press

Bulk shipping

Package shipping

Pellets

Cans

Pans

Checking the quality of the cans is done primarily by visual inspec- tion, including verifying the assembly operation is correct, checking filled cans for correct weight, inspecting cans to see that labels are properly aligned, and checking to see that plastic pour spouts are cor- rectly attached.

The equipment on the production line is sensitive to misshapen or damaged cans, and frequently jams, causing production delays. This greatly reduces the chance of a defective can getting through the pro- cess, but it reduces productivity, and the salt in the defective cans must be scrapped. The cost of quality is fairly high, owing to the amount of product that is scrapped, the large number of inspectors, and the exten- sive laboratory testing that is needed.

Production Planning and Inventory The plant can sell all of the salt it produces. The job of the production scheduler is to distribute the salt that is stored in the silos to the various production areas, taking into account production capacities in each area and available inventory levels of those products. A key consideration is to make sure there is sufficient storage capacity in the silos to handle the incoming salt from brine production.

Equipment Maintenance and Repair The equipment is 1950s vintage, and it requires a fair amount of main- tenance to keep it in good working order. Even so, breakdowns occur as parts wear out. The plant has its own tool shop where skilled workers repair parts or make new parts because replacement parts are no lon- ger available for the old equipment.

Questions

1. Briefly describe salt production, from brine production to finished round cans.

2. Briefly describe quality assurance efforts in round can production. 3. What are some of the possible reasons why the company continues

to use the old processing equipment instead of buying new, more modern equipment?

4. Where would you place salt production in the product–process spectrum?

5. Determine the approximate number of tons of salt produced annu- ally. Hints: one ton  �  2,000 pounds, and one pound  �  16 ounces.

6. What improvements can you suggest for the plant?

ste24102_ch06_236-287.indd 243ste24102_ch06_236-287.indd 243 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

244 Chapter Six Process Selection and Facility Layout

Product and Service Profiling Process selection can involve substantial investment in equipment and have a very specific influence on the layout of facilities, which also require heavy investment. Moreover, mis- matches between operations capabilities and market demand and pricing or cost strategies can have a significant negative impact on the ability of the organization to compete or, in govern- ment agencies, to effectively service clients. Therefore, it is highly desirable to assess the degree of correlation between various process choices and market conditions before making process choices in order to achieve an appropriate matching.

Product or service profiling can be used to avoid any inconsistencies by identifying key product or service dimensions and then selecting appropriate processes. Key dimensions often relate to the range of products or services that will be processed, expected order sizes, pricing strategies, expected frequency of schedule changes, and order-winning requirements.

Sustainable Production of Goods and Services Business organizations are facing increasing pressure from a variety of sources to operate sustainable production processes. According to the Lowell Center for Sustainable Production ( http://sustainableproduction.org ), “Sustainable Production is the creation of goods and ser- vices using processes and systems that are: non-polluting; conserving of energy and natural resources; economically efficient; safe and healthful for workers, communities, and consum- ers; and socially and creatively rewarding for all working people.” To achieve this, the Lowell Center advocates designing and operating processes in ways that:

• “wastes and ecologically incompatible byproducts are reduced, eliminated or recycled on-site;

• chemical substances or physical agents and conditions that present hazards to human health or the environment are eliminated;

• energy and materials are conserved, and the forms of energy and materials used are most appropriate for the desired ends; and

• work spaces are designed to minimize or eliminate chemical, ergonomic and physical hazard.”

To achieve these goals, business organizations must focus on a number of factors that include energy use and efficiency, CO 2 (carbon footprint) and toxic emissions, waste genera- tion, lighting, heating, cooling, ventilation, noise and vibration, and worker health and safety.

Lean Process Design Lean process design is guided by general principles that are discussed more fully in a later chapter. One principle of particular interest here is waste reduction, which relates to sustain- ability objectives. Lean design also focuses on variance reduction in workload over the entire process to achieve level production and thereby improve process flow. Successful lean design results in reduced inventory and floor space; quicker response times and shorter lead times; reduced defects, rework, and scrap; and increased productivity. Lean design is often translated into practice using cellular layouts, which are discussed later in this chapter.

Lean process design has broad applications in seemingly diverse areas such as health care delivery systems, manufacturing, construction projects, and process reengineering.

6.3 TECHNOLOGY Technology and technological innovation often have a major influence on business processes. Technological innovation refers to the discovery and development of new or improved prod- ucts, services, or processes for producing or providing them. Technology refers to applica- tions of scientific discoveries to the development and improvement of goods and services and/or the processes that produce or provide them. It can involve such factors as knowledge,

Product or service profiling   Linking key product or service requirements to process capabilities.

Technology  The application of scientific discoveries to the development and improvement of products and services and operations processes.

Technological innovation   The discovery and development of new or improved products, services, or processes for pro- ducing or providing them.

LO6.4 Explain the need for management of technology.

ste24102_ch06_236-287.indd 244ste24102_ch06_236-287.indd 244 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 245

materials, methods, and equipment. The term high technology refers to the most advanced and developed equipment and methods.

Process technology and information technology can have a major impact on costs, pro- ductivity, and competitiveness. Process technology includes methods, procedures, and equip- ment used to produce goods and provide services. This not only involves processes within an organization, it also extends to supply chain processes. Information technology (IT) is the science and use of computers and other electronic equipment to store, process, and send information. IT is heavily ingrained in today’s business operations. This includes electronic data processing, the use of bar codes and radio frequency tags to identify and track goods, devices used to obtain point-of-sale information, data transmission, the Internet, e-commerce, e-mail, and more.

With radio frequency (RFID) tags, items can be tracked during production and in inven- tory. For outbound goods, readers at a packing station can verify that the proper items and quantities were picked before shipping the goods to a customer or a distribution center. In a hospital setting, RFID tags can be used in several ways. One is to facilitate keeping accurate track of hospital garments, automating the process by which clean garments are inventoried and disbursed. An RFID tag can be worn by each hospital employee. The tag contains a unique ID number which is associated with each wearer. When an employee comes to the counter to pick up garments, the employee’s tag is scanned and software generates data regarding gar- ment, type, size, location on racks, and availability for that employee. The garments are then picked from the specified racks, their RFID tag is read by a nearby scanner and processed, and the database is automatically updated.

Technological innovation in processing technology can produce tremendous benefits for organizations by increasing quality, lowering costs, increasing productivity, and expanding processing capabilities. Among the examples are laser technology used in surgery and laser measuring devices, advances in medical diagnostic equipment, high-speed Internet connec- tions, high-definition television, online banking, information retrieval systems, and high- speed search engines. Processing technologies often come through acquisition rather than through internal efforts of an organization.

While process technology can have enormous benefits, it also carries substantial risk unless a significant effort is made to fully understand both the downside and the upside of a particular technology. It is essential to understand what the technology will and won’t do. Also, there are economic considerations (initial cost, space, cash flow, maintenance, consul- tants), integration considerations (cost, time, resources), and human considerations (training, safety, job loss).

Automation An increasingly asked question in process design is whether to automate. Automation is machinery that has sensing and control devices that enable it to operate automatically. If a company decides to automate, the next question is how much. Automation can range from factories that are completely automated to a single automated operation.

Automated services are becoming increasingly important. Examples range from automated teller machines (ATMs) to automated heating and air conditioning and include automated inspection, automated storage and retrieval systems, package sorting, mail processing, e-mail, online banking, and E-Z pass.

Automation offers a number of advantages over human labor. It has low variability, whereas it is difficult for a human to perform a task in exactly the same way, in the same amount of time, and on a repetitive basis. In a production setting, variability is detrimental to quality and to meeting schedules. Moreover, machines do not get bored or distracted, nor do they go out on strike, ask for higher wages, or file labor grievances. Still another advantage of automation is reduction of variable costs. In order for automated processing to be an option, job-processing requirements must be standardized (i.e., have very little or no variety).

Both manufacturing and service organizations are increasing their use of automation as a way to reduce costs, increase productivity, and improve quality and consistency.

Automation  Machinery that has sensing and control devices that enable it to operate automatically.

ste24102_ch06_236-287.indd 245ste24102_ch06_236-287.indd 245 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

246 Chapter Six Process Selection and Facility Layout

Automation is frequently touted as a strategy necessary for competitiveness. However, automation also has certain disadvantages and limitations compared to human labor. To begin with, it can be costly. Technology is expensive; usually it requires high volumes of output to offset high costs. In addition, automation is much less flexible than human labor. Once a process has been automated, there is substantial reason for not changing it. Moreover, workers sometimes fear automation because it might cause them to lose their jobs. That can have an adverse effect on morale and productivity.

Decision makers must carefully examine the issue of whether to automate or the degree to which to automate, so that they clearly understand all the ramifications. Also, much thought and careful planning are necessary to successfully integrate automation into a production system. Otherwise, it can lead to major problems. Automation has important implications not only for cost and flexibility, but also for the fit with overall strategic priorities. If the decision is made to automate, care must be taken to remove waste from the system prior to automating, to avoid building the waste into the automated system. Table 6.3 has a list of questions for organizations that are considering automation.

Generally speaking, there are three kinds of automation: fixed, programmable, and flexible. Fixed automation is the least flexible. It uses high-cost, specialized equipment for a fixed

sequence of operations. Low cost and high volume are its primary advantages; minimal vari- ety and the high cost of making major changes in either product or process are its primary limitations.

Programmable automation involves the use of high-cost, general-purpose equipment controlled by a computer program that provides both the sequence of operations and specific details about each operation. This type of automation has the capability of economically pro- ducing a fairly wide variety of low-volume products in small batches. Numerically controlled (N/C) machines and some robots are applications of programmable automation.

1. What level of automation is appropriate? (Some operations are more suited to being automated than others, so partial automation can be an option.)

2. How would automation affect the flexibility of an operation system? 3. How can automation projects be justified? 4. How should changes be managed? 5. What are the risks of automating? 6. What are some of the likely effects of implementing automation on market share, costs, quality, customer

satisfaction, labor relations, and ongoing operations?

TABLE 6.3 Automation questions

Questions

1. As Foxconn cuts jobs as it shifts to greater use of automation, jobs will be created in other companies. In what types of companies would you expect to see jobs created?

2. Many companies outsourced their manufacturing activities to Fox- conn due to its low labor costs. Does Foxconn’s shift to automation make it likely that some of those companies will reconsider out- sourcing in favor of shifting to automation? What are some reasons for staying with Foxconn, and what are some reasons that favor shifting to their own automated processes?

Source: Based on “Foxconn halts recruitment as focus shifts to automation,” He Wei in Shanghai, China Daily, February 2, 2013, p. 9.

Foxconn operates a network of factories across the Chinese mainland, employing 1.2 million people, that makes products for tech companies that include Apple, Hewlett Packard, and Dell. The electronics manufac- turing giant has been on a steady course for a while to replace man- power with robotic systems.

“Foxconn (has) vowed to install up to 1 million robots in its facto- ries over the next three years, which analysts suggested was in part to address long-time scandals such as high suicide rates among employ- ees and exploitation of workers.”

Foreign manufacturers in China are also viewing upgrades as vital to their operations in the country. In fact, numerous multinational compa- nies have recognized the long-term benefits of replacing human labor with robots.

READING Foxconn Shifts Its Focus to Automation

ste24102_ch06_236-287.indd 246ste24102_ch06_236-287.indd 246 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 247

Computer-aided manufacturing (CAM) refers to the use of computers in process control, ranging from robots to automated quality control. Numerically controlled (N/C) machines are programmed to follow a set of processing instructions based on mathematical relationships that tell the machine the details of the operations to be performed. The instruc- tions are stored on a device such as magnetic tape or microprocessor. Although N/C machines have been used for many years, they are an important part of new approaches to manufactur- ing. Individual machines often have their own computer; this is referred to as computerized numerical control (CNC). Or one computer may control a number of N/C machines, which is referred to as direct numerical control (DNC).

N/C machines are best used in cases where parts are processed frequently and in small batches, where part geometry is complex, close tolerances are required, mistakes are costly, and there is the possibility of frequent changes in design. The main limitations of N/C machines are the higher skill levels needed to program the machines and their inability to detect tool wear and material variation.

The use of robots in manufacturing is sometimes an option. Robots can handle a wide vari- ety of tasks, including welding, assembly, loading and unloading of machines, painting, and testing. They relieve humans from heavy or dirty work and often eliminate drudgery tasks.

Some uses of robots are fairly simple, others are much more complex. At the lowest level are robots that follow a fixed set of instructions. Next are programmable robots, which can repeat a set of movements after being led through the sequence. These robots “play back” a mechanical sequence much as a video recorder plays back a visual sequence. At the next level up are robots that follow instructions from a computer. Below are robots that can recognize objects and make certain simple decisions.

Flexible automation evolved from programmable automation. It uses equipment that is more customized than that of programmable automation. A key difference between the two is that flexible automation requires significantly less changeover time. This permits almost con- tinuous operation of equipment and product variety without the need to produce in batches.

Computer-aided manufacturing (CAM)  The use of computers in process control.

Numerically controlled (N/C) machines  Machines that perform operations by following mathematical processing instructions.

Computer numerical control (CNC) refers to a computer that reads instructions and drives a machine tool. CNC machines are controlled directly from files created by CAM software packages. With increased automation of manufacturing processes with CNC machining, considerable improvements in consistency and quality have been achieved. CNC automation reduces the frequency of errors and provides operators with time to perform additional tasks. The intelligence of CNC controllers has dramatically increased job shop cell production. Some machines might even make 1,000 parts on a weekend with no operator, checking each part with lasers and sensors.

ste24102_ch06_236-287.indd 247ste24102_ch06_236-287.indd 247 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

248 Chapter Six Process Selection and Facility Layout

In practice, flexible automation is used in several different formats. A flexible manufacturing system (FMS) is a group of machines that include supervi-

sory computer control, automatic material handling, and robots or other automated processing equipment. Reprogrammable controllers enable these systems to produce a variety of similar products. Systems may range from three or four machines to more than a dozen. They are designed to handle intermittent processing requirements with some of the benefits of automa- tion and some of the flexibility of individual, or stand-alone, machines (e.g., N/C machines). Flexible manufacturing systems offer reduced labor costs and more consistent quality when compared with more traditional manufacturing methods, lower capital investment and higher flexibility than “hard” automation, and relatively quick changeover time. Flexible manufac- turing systems often appeal to managers who hope to achieve both the flexibility of job shop processing and the productivity of repetitive processing systems.

Although these are important benefits, an FMS also has certain limitations. One is that this type of system can handle a relatively narrow range of part variety, so it must be used for a family of similar parts, which all require similar machining. Also, an FMS requires longer planning and development times than more conventional processing equipment because of its increased complexity and cost. Furthermore, companies sometimes prefer a gradual approach to automation, and FMS represents a sizable chunk of technology.

Computer-integrated manufacturing (CIM) is a system that uses an integrating com- puter system to link a broad range of manufacturing activities, including engineering design, flexible manufacturing systems, purchasing, order processing, and production planning and control. Not all elements are absolutely necessary. For instance, CIM might be as simple as linking two or more FMSs by a host computer. More encompassing systems can link sched- uling, purchasing, inventory control, shop control, and distribution. In effect, a CIM system integrates information from other areas of an organization with manufacturing.

The overall goal of using CIM is to link various parts of an organization to achieve rapid response to customer orders and/or product changes, to allow rapid production, and to reduce indirect labor costs.

A shining example of how process choices can lead to competitive advantages can be found at Allen-Bradley’s computer-integrated manufacturing process in Milwaukee, Wisconsin. The company converted a portion of its factory to a fully automated “factory within a factory”

Flexible manufacturing system (FMS)  A group of machines designed to handle intermittent processing require- ments and produce a variety of similar products.

Computer-integrated manufacturing (CIM)  A sys- tem for linking a broad range of manufacturing activities through an integrating computer system.

Tmsuk’s receptionist robot is used for medical purposes. These robots can guide a hospital visitor to a nearby elevator. If a human touches the panel on the robot’s body or speaks to it, the robot can display or print directions.

ste24102_ch06_236-287.indd 248ste24102_ch06_236-287.indd 248 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 249

At the Ford Motor plant in Michigan, in the final assembly area, flexibility means that the build sequence is the same, regardless of model, on one or more platforms. This allows for efficient use of people and equipment.

to assemble contactors and relays for electrical motors. A handful of humans operate the factory, although once an order has been entered into the system, the machines do virtually all the work, including packaging and shipping, and quality control. Any defective items are removed from the line, and replacement parts are automatically ordered and scheduled to compensate for the defective items. The humans program the machines, monitor operations, and attend to any problems signaled by a system of warning lights.

As orders come into the plant, computers determine production requirements and sched- ules and order the necessary parts. Bar-coded labels that contain processing instructions are automatically placed on individual parts. As the parts approach a machine, a sensing device reads the bar code and communicates the processing instructions to the machine. The factory can produce 600 units an hour.

The company has realized substantial competitive advantages from the system. Orders can be completed and shipped within 24 hours of entry into the system, indirect labor costs and inventory costs have been greatly reduced, and quality is very high.

6.4 PROCESS STRATEGY Throughout this book, the importance of flexibility as a competitive strategy is stressed. How- ever, flexibility does not always offer the best choice in processing decisions. Flexible sys- tems and equipment are often more expensive and not as efficient as less flexible alternatives. In certain instances, flexibility is unnecessary because products are in mature stages, requir- ing few design changes, and there is a steady volume of output. Ordinarily, this type of situa- tion calls for specialized processing equipment, with no need for flexibility. The implication is clear: Flexibility should be adopted with great care; its applications should be matched with situations in which a need for flexibility clearly exists.

In practice, decision makers choose flexible systems for either of two reasons: Demand variety or uncertainty exists about demand. The second reason can be overcome through improved forecasting.

ste24102_ch06_236-287.indd 249ste24102_ch06_236-287.indd 249 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

250 Chapter Six Process Selection and Facility Layout

6.5 STRATEGIC RESOURCE ORGANIZATION: FACILITIES LAYOUT Layout refers to the configuration of departments, work centers, and equipment, with particu- lar emphasis on movement of work (customers or materials) through the system. This section describes the main types of layout designs and the models used to evaluate design alternatives.

As in other areas of system design, layout decisions are important for three basic reasons: (1) they require substantial investments of money and effort; (2) they involve long-term com- mitments, which makes mistakes difficult to overcome; and (3) they have a significant impact on the cost and efficiency of operations.

The need for layout planning arises both in the process of designing new facilities and in redesigning existing facilities. The most common reasons for redesign of layouts include inefficient operations (e.g., high cost, bottlenecks), accidents or safety hazards, changes in the design of products or services, introduction of new products or services, changes in the vol- ume of output or mix of outputs, changes in methods or equipment, changes in environmental or other legal requirements, and morale problems (e.g., lack of face-to-face contact).

Poor layout design can adversely affect system performance. For example, a change in the layout at the Minneapolis–St. Paul International Airport solved a problem that had plagued travelers. In the former layout, security checkpoints were located in the boarding area. That meant that arriving passengers who were simply changing planes had to pass through a secu- rity checkpoint before being able to board their connecting flight, along with other passen- gers whose journeys were originating at Minneapolis–St. Paul. This created excessive waiting times for both sets of passengers. The new layout relocated the security checkpoints, moving them from the boarding area to a position close to the ticket counters. Thus, the need for pas- sengers who were making connecting flights to pass through security was eliminated, and in the process, the waiting time for passengers departing from Minneapolis–St. Paul was con- siderably reduced. 1

The basic objective of layout design is to facilitate a smooth flow of work, material, and information through the system. Supporting objectives generally involve the following:

1. To facilitate attainment of product or service quality.

2. To use workers and space efficiently.

3. To avoid bottlenecks.

4. To minimize material handling costs.

5. To eliminate unnecessary movements of workers or materials.

6. To minimize production time or customer service time.

7. To design for safety.

The three basic types of layout are product, process, and fixed-position. Product layouts are most conducive to repetitive processing, process layouts are used for intermittent process- ing, and fixed-position layouts are used when projects require layouts. The characteristics, advantages, and disadvantages of each layout type are described in this section, along with hybrid layouts, which are combinations of these pure types. These include cellular layouts and flexible manufacturing systems.

Repetitive Processing: Product Layouts Product layouts are used to achieve a smooth and rapid flow of large volumes of goods or customers through a system. This is made possible by highly standardized goods or services that allow highly standardized, repetitive processing. The work is divided into a series of standardized tasks, permitting specialization of equipment and division of labor. The large volumes handled by these systems usually make it economical to invest substantial sums

LO6.5 List some reasons for redesign of layouts.

1 Based on “Airport Checkpoints Moved to Help Speed Travelers on Their Way,” Minneapolis–St. Paul Star Tribune, January 13, 1995, p. 1B.

Product layout  Layout that uses standardized processing operations to achieve smooth, rapid, high-volume flow.

LO6.6 Describe product lay- outs and their main advantages and disadvantages.

ste24102_ch06_236-287.indd 250ste24102_ch06_236-287.indd 250 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 251

of money in equipment and job design. Because only one or a few very similar items are involved, it is feasible to arrange an entire layout to correspond to the technological pro- cessing requirements of the product or service. For instance, if a portion of a manufacturing operation required the sequence of cutting, sanding, and painting, the appropriate pieces of equipment would be arranged in that same sequence. And because each item follows the same sequence of operations, it is often possible to utilize fixed-path material-handling equipment such as conveyors to transport items between operations. The resulting arrangement forms a line like the one depicted in Figure 6.3 . In manufacturing environments, the lines are referred to as production lines or assembly lines, depending on the type of activity involved. In service processes, the term line may or may not be used. It is common to refer to a cafeteria line as such but not a car wash, although from a conceptual standpoint the two are nearly identical. Figure 6.4 illustrates the layout of a typical cafeteria serving line. Examples of this type of layout are less plentiful in service environments because processing requirements usually exhibit too much variability to make standardization feasible. Without high standard- ization, many of the benefits of repetitive processing are lost. When lines are used, certain compromises may be made. For instance, an automatic car wash provides equal treatment to all cars—the same amount of soap, water, and scrubbing—even though cars may differ con- siderably in cleaning needs.

Product layouts achieve a high degree of labor and equipment utilization, which tends to offset their high equipment costs. Because items move quickly from operation to opera- tion, the amount of work-in-process is often minimal. Consequently, operations are so closely tied to each other that the entire system is highly vulnerable to being shut down because of mechanical failure or high absenteeism. Maintenance procedures are geared to this. Preven- tive maintenance —periodic inspection and replacement of worn parts or those with high fail- ure rates—reduces the probability of breakdowns during the operations. Of course, no amount of preventive activity can completely eliminate failures, so management must take measures to provide quick repair. These include maintaining an inventory of spare parts and having repair personnel available to quickly restore equipment to normal operation. These proce- dures are fairly expensive; because of the specialized nature of equipment, problems become more difficult to diagnose and resolve, and spare-part inventories can be extensive.

Repetitive processing can be machine paced (e.g., automatic car wash, automobile assem- bly), worker paced (e.g., fast-food restaurants such as McDonald’s, Burger King), or even customer paced (e.g., cafeteria line).

The main advantages of product layouts are

1. A high rate of output.

2. Low unit cost due to high volume. The high cost of specialized equipment is spread over many units.

Production line  Standardized layout arranged according to a fixed sequence of production tasks.

Assembly line  Standardized layout arranged according to a fixed sequence of assembly tasks.

FIGURE 6.3 A flow line for production or service Station

n Station

3 Station

2 Station

1

Raw materials or customer

Finished item

Materials and/or labor

Materials and/or labor

Materials and/or labor

Materials and/or labor

Work flow[Begin] [End]

FIGURE 6.4 Cafeteria line

CashierBeverageBread and rolls

Potato and vegetable

Main course

SaladsDessertsTray and silver

ste24102_ch06_236-287.indd 251ste24102_ch06_236-287.indd 251 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

252 Chapter Six Process Selection and Facility Layout

3. Labor specialization, which reduces training costs and time, and results in a wide span of supervision.

4. Low material-handling cost per unit. Material handling is simplified because units follow the same sequence of operations. Material handling is often automated.

5. A high utilization of labor and equipment.

6. The establishment of routing and scheduling in the initial design of the system. These activities do not require much attention once the system is operating.

7. Fairly routine accounting, purchasing, and inventory control.

The primary disadvantages of product layouts include the following:

1. The intensive division of labor usually creates dull, repetitive jobs that provide little opportunity for advancement and may lead to morale problems and to repetitive stress injuries.

2. Poorly skilled workers may exhibit little interest in maintaining equipment or in the quality of output.

3. The system is fairly inflexible in response to changes in the volume of output or changes in product or process design.

4. The system is highly susceptible to shutdowns caused by equipment breakdowns or excessive absenteeism because workstations are highly interdependent.

5. Preventive maintenance, the capacity for quick repairs, and spare-parts inventories are necessary expenses.

6. Incentive plans tied to individual output are impractical since they would cause variations among outputs of individual workers, which would adversely affect the smooth flow of work through the system.

U-Shaped Layouts. Although a straight production line may have intuitive appeal, a U-shaped line (see Figure 6.5 ) has a number of advantages that make it worthy of consid- eration. One disadvantage of a long, straight line is that it interferes with cross-travel of workers and vehicles. A U-shaped line is more compact; it often requires approximately half the length of a straight production line. In addition, a U-shaped line permits increased communication among workers on the line because workers are clustered, thus facilitating

Workers assemble “Wizard of Oz” pinball machines at Jersey Jack Pinball.

ste24102_ch06_236-287.indd 252ste24102_ch06_236-287.indd 252 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 253

teamwork. Flexibility in work assignments is increased because workers can handle not only adjacent stations but also stations on opposite sides of the line. Moreover, if materials enter the plant at the same point that finished products leave it, a U-shaped line minimizes material handling.

Of course, not all situations lend themselves to U-shaped layouts: On highly automated lines there is less need for teamwork and communication. And entry and exit points may be on opposite sides of the building. Also, operations may need to be separated because of noise or contamination factors.

Nonrepetitive Processing: Process Layouts Process layouts (functional layouts) are designed to process items or provide services that involve a variety of processing requirements. The variety of jobs that are processed requires frequent adjustments to equipment. This causes a discontinuous work flow, which is referred to as intermittent processing. The layouts feature departments or other functional groupings in which similar kinds of activities are performed. A manufacturing example of a process layout is the machine shop, which has separate departments for milling, grinding, drill- ing, and so on. Items that require those operations are frequently moved in lots or batches to the departments in a sequence that varies from job to job. Consequently, variable-path material-handling equipment (forklift trucks, jeeps, tote boxes) is needed to handle the variety of routes and items. The use of general-purpose equipment provides the flexibility necessary to handle a wide range of processing requirements. Workers who operate the equipment are usually skilled or semiskilled. Figure 6.6 illustrates the departmental arrangement typical of a process layout.

Process layouts are quite common in service environments. Examples include hospi- tals, colleges and universities, banks, auto repair shops, airlines, and public libraries. For instance, hospitals have departments or other units that specifically handle surgery, mater- nity, pediatrics, psychiatric, emergency, and geriatric care. And universities have separate schools or departments that concentrate on one area of study such as business, engineering, science, or math.

Because equipment in a process layout is arranged by type rather than by processing sequence, the system is much less vulnerable to shutdown caused by mechanical failure or absenteeism. In manufacturing systems especially, idle equipment is usually available to

LO6.7 Describe process lay- outs and their main advantages and disadvantages.

Process layouts  Layouts that can handle varied processing requirements.

Intermittent processing   Nonrepetitive processing.

FIGURE 6.5 A U-shaped production line

4321

78910

5

6

In

Out

Workers

FIGURE 6.6 Comparison of process and product layouts

Workstation 1

Dept. EDept. CDept. A

Dept. FDept. DDept. B

Workstation 2

Process Layout (functional)

Used for Intermittent Processing Job Shop and Batch Processes

Product Layout (sequential)

Used for Repetitive Processing Repetitive and Continuous Processes

Workstation 3

ste24102_ch06_236-287.indd 253ste24102_ch06_236-287.indd 253 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

254 Chapter Six Process Selection and Facility Layout

replace machines that are temporarily out of service. Moreover, because items are often pro- cessed in lots (batches), there is considerably less interdependence between successive opera- tions than with a product layout. Maintenance costs tend to be lower because the equipment is less specialized than that of product layouts, and the grouping of machinery permits repair personnel to become skilled in handling that type of equipment. Machine similarity reduces the necessary investment in spare parts. On the negative side, routing and scheduling must be done on a continual basis to accommodate the variety of processing demands typically imposed on these systems. Material handling is inefficient, and unit handling costs are gen- erally much higher than in product layouts. In-process inventories can be substantial due to batch processing and capacity mismatches. Furthermore, it is not uncommon for such systems to have equipment utilization rates under 50 percent because of routing and scheduling com- plexities related to the variety of processing demands being handled.

In sum, process layouts have both advantages and disadvantages. The advantages of process layouts include the following:

1. The systems can handle a variety of processing requirements.

2. The systems are not particularly vulnerable to equipment failures.

3. General-purpose equipment is often less costly than the specialized equipment used in product layouts and is easier and less costly to maintain.

4. It is possible to use individual incentive systems.

The disadvantages of process layouts include the following:

1. In-process inventory costs can be high if batch processing is used in manufacturing systems.

2. Routing and scheduling pose continual challenges.

3. Equipment utilization rates are low.

4. Material handling is slow and inefficient, and more costly per unit than in product layouts.

5. Job complexities often reduce the span of supervision and result in higher supervisory costs than with product layouts.

6. Special attention necessary for each product or customer (e.g., routing, scheduling, machine setups) and low volumes result in higher unit costs than with product layouts.

7. Accounting, inventory control, and purchasing are much more involved than with product layouts.

Fixed-Position Layouts In fixed-position layouts, the item being worked on remains stationary, and workers, mate- rials, and equipment are moved about as needed. This is in marked contrast to product and process layouts. Almost always, the nature of the product dictates this kind of arrangement: Weight, size, bulk, or some other factor makes it undesirable or extremely difficult to move the product. Fixed-position layouts are used in large construction projects (buildings, power plants, dams), shipbuilding, and production of large aircraft and space mission rockets. In those instances, attention is focused on timing of material and equipment deliveries so as not to clog up the work site and to avoid having to relocate materials and equipment around the work site. Lack of storage space can present significant problems, for example, at construc- tion sites in crowded urban locations. Because of the many diverse activities carried out on large projects and because of the wide range of skills required, special efforts are needed to coordinate the activities, and the span of control can be quite narrow. For these reasons, the administrative burden is often much higher than it would be under either of the other layout types. Material handling may or may not be a factor; in many cases, there is no tangible prod- uct involved (e.g., designing a computerized inventory system). When goods and materials are involved, material handling often resembles process-type, variable-path, general-purpose

Fixed-position layout  Layout in which the product or project remains stationary, and workers, materials, and equipment are moved as needed.

ste24102_ch06_236-287.indd 254ste24102_ch06_236-287.indd 254 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 255

equipment. Projects might require use of earth-moving equipment and trucks to haul materi- als to, from, and around the work site, for example.

Fixed-position layouts are widely used in farming, firefighting, road building, home building, remodeling and repair, and drilling for oil. In each case, compelling reasons bring workers, materials, and equipment to the “product’s” location instead of the other way around.

Combination Layouts The three basic layout types are ideal models, which may be altered to satisfy the needs of a particular situation. It is not hard to find layouts that represent some combination of these pure types. For instance, supermarket layouts are essentially process layouts, yet we find that most use fixed-path material-handling devices such as roller-type conveyors in the stockroom and belt-type conveyors at the cash registers. Hospitals also use the basic process arrange- ment, although frequently patient care involves more of a fixed-position approach, in which nurses, doctors, medicines, and special equipment are brought to the patient. By the same token, faulty parts made in a product layout may require off-line reworking, which involves customized processing. Moreover, conveyors are frequently observed in both farming and construction activities.

Process layouts and product layouts represent two ends of a continuum from small jobs to continuous production. Process layouts are conducive to the production of a wider range of products or services than product layouts, which is desirable from a customer standpoint where customized products are often in demand. However, process layouts tend to be less efficient and have higher unit production costs than product layouts. Some manufacturers are moving away from process layouts in an effort to capture some of the benefits of product layouts. Ideally, a system is flexible and yet efficient, with low unit production costs. Cellu- lar manufacturing, group technology, and flexible manufacturing systems represent efforts to move toward this ideal.

The Queen Mary 2 when under construction at the Chantiers de l’Atlantique shipyard in St. Nazaire, France. When a large project must remain stationary, workers and equipment come to the site. The QM2 weighs 150,000 tons, is 1,132 feet long, and is 147.6 feet wide. Its capacity is 2,620 passengers and 1,253 officers and crew.

ste24102_ch06_236-287.indd 255ste24102_ch06_236-287.indd 255 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

256 Chapter Six Process Selection and Facility Layout

Cellular Layouts Cellular Production. Cellular production is a type of layout in which workstations are grouped into what is referred to as a cell. Groupings are determined by the operations needed to perform work for a set of similar items, or part families, that require similar processing. The cells become, in effect, miniature versions of product layouts. The cells may have no conveyorized movement of parts between machines, or they may have a flow line connected by a conveyor (automatic transfer). All parts follow the same route, although minor variations (e.g., skipping an operation) are possible. In contrast, the functional layout involves multiple paths for parts. Moreover, there is little effort or need to identify part families.

Cellular manufacturing enables companies to produce a variety of products with as little waste as possible. A cell layout provides a smooth flow of work through the process with min- imal transport or delay. Benefits frequently associated with cellular manufacturing include minimal work in process, reduced space requirements and lead times, productivity and quality improvement, and increased flexibility.

Figure 6.7 provides a comparison between a traditional process layout (6.7A) and a cellu- lar layout (6.7B). To get a sense of the advantage of the cellular layout, trace the movement of an order in the traditional layout (6.7A) that is depicted by the path of the arrow. Begin on the

Cellular production   Layout in which workstations are grouped into a cell that can process items that have similar processing requirements.

FIGURE 6.7 Comparison of process and cellular layouts

Source: Adapted from U.S. Environmental Protection Agency, “Lean Manufacturing and the Environment,” www.epa.gov/innovation/ lean/thinking/cellular.htm .

Boring Dept.

Chemical Treatment

Dept. Painting Dept.

Customer

Milling Dept. Assembly

Dept.

Parts Supplier

Deburring Dept.

Shipping/ Receiving

Warehouse 400 units

released for production

A. Example of an order processed in a traditional process layout.

Supplier 4 units delivered for production

Milling machine

Chemical treatment machine

Boring machine

Assembly machine

Painting machine

Customer

Deburring machine

B. The same example of an order processed in a cellular layout.

ste24102_ch06_236-287.indd 256ste24102_ch06_236-287.indd 256 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 257

bottom left at Shipping/Receiving, then follow the arrow to Warehouse, where a batch of raw material is released for production. Follow the path (shown by the arrows) that the batch takes as it moves through the system to Shipping/Receiving and then to the Customer. Now turn to Figure 6.7B . Note the simple path the order takes as it moves through the system.

Several techniques facilitate effective cellular layout design. Among them are the follow- ing two:

Single-minute exchange of die (SMED) enables an organization to quickly convert a machine or process to produce a different (but similar) product type. Thus, a single cell can produce a variety of products without the time-consuming equipment changeover associated with large batch processes, enabling the organization to quickly respond to changes in customer demand.

Right-sized equipment is often smaller than equipment used in traditional process layouts, and mobile, so that it can quickly be reconfigured into a different cellular layout in a different location.

Table 6.4 lists the benefits of cellular layouts compared to functional layouts. The biggest challenges of implementing cellular manufacturing involve issues of equip-

ment and layout and issues of workers and management. Equipment and layout issues relate to design and cost. The costs of work stoppages during implementation can be considerable, as can the costs of new or modified equipment and the rearrangement of the layout. The costs to implement cellular manufacturing must be weighed against the cost savings that can be expected from using cells. Also, the implementation of cell manufacturing often requires employee training and the redefinition of jobs. Each of the workers in each cell should ideally be able to complete the entire range of tasks required in that cell, and often this means being more multiskilled than they were previously. In addition, cells are often expected to be self- managing, and therefore workers will have to be able to work effectively in teams. Managers have to learn to be less involved than with more traditional work methods.

Group Technology. Effective cellular manufacturing must have groups of identified items with similar processing characteristics. This strategy for product and process design is known as group technology and involves identifying items with similarities in either design char- acteristics or manufacturing characteristics, and grouping them into part families. Design characteristics include size, shape, and function; manufacturing or processing characteristics involve the type and sequence of operations required. In many cases, design and processing characteristics are correlated, although this is not always the case. Thus, design families may be different from processing families. Figure 6.8 illustrates a group of parts with similar pro- cessing characteristics but different design characteristics.

Once similar items have been identified, items can be classified according to their fami- lies; then a system can be developed that facilitates retrieval from a database for purposes of design and manufacturing. For instance, a designer can use the system to determine if there

Group technology  The group- ing into part families of items with similar design or manufac- turing characteristics.

TABLE 6.4 A comparison of functional (process) layouts and cellular layouts

Dimension Functional Cellular

Number of moves between departments Many Few Travel distances Longer Shorter Travel paths Variable Fixed Job waiting time Greater Shorter Throughput time Higher Lower Amount of work in process Higher Lower Supervision difficulty Higher Lower Scheduling complexity Higher Lower Equipment utilization Lower Higher

ste24102_ch06_236-287.indd 257ste24102_ch06_236-287.indd 257 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

258 Chapter Six Process Selection and Facility Layout

is an existing part similar or identical to one that needs to be designed. It may happen that an existing part, with some modification, is satisfactory. This greatly enhances the productivity of design. Similarly, planning the manufacturing of a new part can include matching it with one of the part families in existence, thereby alleviating much of the burden of specific pro- cessing details.

The conversion to group technology and cellular production requires a systematic analysis of parts to identify the part families. This is often a major undertaking; it is a time-consuming job that involves the analysis of a considerable amount of data. Three primary methods for accomplishing this are visual inspection, examination of design and production data, and pro- duction flow analysis.

Visual inspection is the least accurate of the three but also the least costly and the sim- plest to perform. Examination of design and production data is more accurate but much more time-consuming; it is perhaps the most commonly used method of analysis. Production flow analysis has a manufacturing perspective and not a design perspective, because it examines operations sequences and machine routings to uncover similarities. Moreover, the operation sequences and routings are taken as givens; in reality the existing procedures may be far from optimal.

Conversion to cellular production can involve costly realignment of equipment. Conse- quently, a manager must weigh the benefits of a switch from a process layout to a cellular one against the cost of moving equipment as well as the cost and time needed for grouping parts.

Flexible manufacturing systems, discussed earlier, are more fully automated versions of cellular manufacturing.

Service Layouts As is the case with manufacturing, service layouts can often be categorized as product, process, or fixed-position layouts. In a fixed-position service layout (e.g., appliance repair, roofing, landscaping, home remodeling, copier service), materials, labor, and equipment are brought to the customer’s residence or office. Process layouts are common in services due mainly to the high degree of variety in customer processing requirements. Examples include hospitals, supermarkets and department stores, vehicle repair centers, and banks. If the service is organized sequentially, with all customers or work following the same or similar sequence, as it is in a car wash or a cafeteria line, a product layout is used.

FIGURE 6.8 A group of parts with similar manufacturing process requirements but different design attributes

Source: Mikell P. Groover, Automation, Production Systems, and Computer-Aided Manufacturing, 3rd ed., © 2007, p. 508. Reprinted by permission of Pearson Educa- tion Inc., Upper Saddle River, NJ.

ste24102_ch06_236-287.indd 258ste24102_ch06_236-287.indd 258 11/28/13 11:47 PM11/28/13 11:47 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 259

However, service layout requirements are somewhat different from manufacturing layout requirements. The degree of customer contact and the degree of customization are two key factors in service layout design. If contact and customization are both high, as in health care and personal care, the service environment is a job shop, usually with high labor content and flexible equipment, and a layout that supports this. If customization is high but contact low (e.g., picture framing, tailoring), the layout can be arranged to facilitate workers and equip- ment. If contact is high but customization is low (e.g., supermarkets, gas stations), self-service is a possibility, in which case layout must take into account ease of obtaining the service as well as customer safety. If the degree of contact and the need for customization are low, the core service and the customer can be separated, making it easier to achieve a high degree of efficiency in operations. Highly standardized services may lend themselves to automation (e.g., Web services, online banking, ATM machines).

Let’s consider some of these layouts.

Warehouse and Storage Layouts. The design of storage facilities presents a different set of factors than the design of factory layouts. Frequency of order is an important consider- ation; items that are ordered frequently should be placed near the entrance to the facility, and those ordered infrequently should be placed toward the rear of the facility. Any correlations between items are also significant (i.e., item A is usually ordered with item B), suggesting that placing those two items close together would reduce the cost and time of picking (retriev- ing) those items. Other considerations include the number and widths of aisles, the height of storage racks, rail and/or truck loading and unloading, and the need to periodically make a physical count of stored items.

Retail Layouts. The objectives that guide design of manufacturing layouts often pertain to cost minimization and product flow. However, with retail layouts such as department stores, supermarkets, and specialty stores, designers must take into account the presence of custom- ers and the opportunity to influence sales volume and customer attitudes through carefully designed layouts. Traffic patterns and traffic flow are important factors to consider. Some large retail chains use standard layouts for all or most of their stores. This has several advan- tages. Most obvious is the ability to save time and money by using one layout instead of custom designing one for each store. Another advantage is to avoid confusing consumers who visit more than one store. In the case of service retail outlets, especially small ones such as dry cleaners, shoe repair, and auto service centers, layout design is much simpler.

Kiosks benefit customers by speeding up tedious processes and reducing waiting time. At McDonald’s, kiosks actually increase sales by an average of $1 over face-to-face purchases. Managers explain this by the kiosk’s ability to prompt customers for more purchases by showing pictures of products they might want to buy.

ste24102_ch06_236-287.indd 259ste24102_ch06_236-287.indd 259 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

260 Chapter Six Process Selection and Facility Layout

READING A Safe Hospital Room of the Future

12 Kits for fall prevention include color-coded nonslip socks, lap blanket and wristband.

13 Frequently touched surfaces, such as IV poles, bed rails and faucets, are made with germ-resistant copper alloys, which are naturally antimicrobial.

14 Infrared technology that lights up the sink reminds health care providers to wash their hands.

15 Beds with translation technology help staff speak with all patients.

16 Real-time vital signs— heart rate, blood pressure—can be monitored from computers outside the room. —B.H.

Questions

1. If you have experienced a hospital room, either as a patient or a visitor, which of these features was present in that room?

2. If you have experienced a hospital room, which of these features was missing, but would have been desirable additions?

Source: “Real Possibilities,” AARP The Magazine, April/May 2013, p. 54.

1 Double-sided linen closets allow staff to restock supplies without disturbing the patient.

2 Bar codes increase safety by matching the right medicine to the right patient.

3 A two-bin supply system ensures that providers don’t run out of critical supplies.

4 A hand-washing station in every room gives providers a place to wash their hands.

5 A sliding glass door doubles as a whiteboard for informa- tion exchanges.

6 Hand bars on all sides of the bathroom help patients navigate more safely.

7 Bed alarms alert nurses that a patient may be attempting to get out of bed unassisted.

8 Disinfecting units use ultra-violet light to kill germs. 9 Checklists give providers a set of proven rules for preventing

infections. 10 Vents suck the air out of the room of sick patients, filter it and then

release it from the building. 11 “Smart” pumps deliver fluids, nutrients and medicines to

patients at precisely controlled rates.

No one expects a stay in a hospital room to be unsafe or having to endure disruptions in their care, although today, there is need for improvement in hospital room safety and patient care. The following are suggestions for an improved hospital room of the future.

ste24102_ch06_236-287.indd 260ste24102_ch06_236-287.indd 260 11/1/13 12:21 PM11/1/13 12:21 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 261

Office Layouts. Office layouts are undergoing transformations as the flow of paperwork is replaced with the increasing use of electronic communications. This lessens the need to place office workers in a layout that optimizes the physical transfer of information or paperwork. Another trend is to create an image of openness; office walls are giving way to low-rise parti- tions, which also facilitate communication among workers.

Restaurant Layouts. There are many different types of restaurants, ranging from food trucks to posh establishments. Many belong to chains, and some of those are franchises. That type of restaurant typically adheres to a floor plan established by the company. Independent restaurants and bars have their own floor plans. Some have what could be considered very good designs, while others do not. Ed Norman of MVP Services Group, Inc., in Dubuque, IA, offers this valuable observation: “The single most important element is process workflow. Food and non-food products should transition easily through the operation from the receiving door to the customer with all phases of storage, pre-preparation, cooking, holding, and ser- vice, unimpaired or minimized due to good design.”

Hospital Layouts. Key elements of hospital layout design are patient care and safety, with easy access to critical resources such as X-ray, CAT scan, and MRI equipment. General lay- out of the hospital is one aspect of layout, while layout of patient rooms is another. The fol- lowing reading illustrates a safe hospital room of the future.

Automation in Services. One way to improve productivity and reduce costs in services is to remove the customer from the process as much as possible. Automated services is one increasingly used alternative. For example, financial services use ATMs, automated call answering, online banking, and electronic funds transfers; retail stores use optical scanning to process sales; and the travel industry uses electronic reservation systems. Other examples of automated services include shipping, mail processing, communication, and health care services.

From self check-in at the airport to depositing a check from anywhere, automation speeds up service and reduces the need to stand in line.

ste24102_ch06_236-287.indd 261ste24102_ch06_236-287.indd 261 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

262 Chapter Six Process Selection and Facility Layout

Automating services means more-standardized services and less need to involve the customer directly. However, service standardization brings trade-offs. Generally, costs are reduced and productivity increases, but the lack of customization and the inability to deal with a real person raise the risk of customer dissatisfaction.

6.6 DESIGNING PRODUCT LAYOUTS: LINE BALANCING The goal of a product layout is to arrange workers or machines in the sequence that operations need to be performed. The sequence is referred to as a production line or an assembly line. These lines range from fairly short, with just a few operations, to long lines that have a large number of operations. Automobile assembly lines are examples of long lines. At the assembly line for Ford Mustangs, a Mustang travels about nine miles from start to finish!

Because it is difficult and costly to change a product layout that is inefficient, design is a critical issue. Many of the benefits of a product layout relate to the ability to divide required work into a series of elemental tasks (e.g., “assemble parts C and D”) that can be performed quickly and routinely by low-skilled workers or specialized equipment. The durations of these elemental tasks typically range from a few seconds to 15 minutes or more. Most time require- ments are so brief that it would be impractical to assign only one task to each worker. For one thing, most workers would quickly become bored by the limited job scope. For another, the number of workers required to complete even a simple product or service would be enormous. Instead, tasks are usually grouped into manageable bundles and assigned to workstations staffed by one or two operators.

The process of deciding how to assign tasks to workstations is referred to as line balancing. The goal of line balancing is to obtain task groupings that represent approximately equal time requirements. This minimizes the idle time along the line and results in a high utilization of labor and equipment. Idle time occurs if task times are not equal among workstations; some stations are capable of producing at higher rates than others. These “fast” stations will experi- ence periodic waits for the output from slower stations or else be forced into idleness to avoid buildups of work between stations. Unbalanced lines are undesirable in terms of inefficient utilization of labor and equipment and because they may create morale problems at the slower stations for workers who must work continuously.

Lines that are perfectly balanced will have a smooth flow of work as activities along the line are synchronized to achieve maximum utilization of labor and equipment. The major obstacle to attaining a perfectly balanced line is the difficulty of forming task bundles that have the same duration. One cause of this is that it may not be feasible to combine certain activities into the same bundle, either because of differences in equipment requirements or because the activities are not compatible (e.g., risk of contamination of paint from sanding). Another cause of difficulty is that differences among elemental task lengths cannot always be overcome by grouping tasks. A third cause of an inability to perfectly balance a line is that a required technological sequence may prohibit otherwise desirable task combinations. Consider a series of three operations that have durations of two minutes, four minutes, and two minutes, as shown in the following diagram. Ideally, the first and third operations could be combined at one workstation and have a total time equal to that of the second operation. However, it may not be possible to combine the first and third operations. In the case of an automatic car wash, scrubbing and drying operations could not realistically be combined at the same workstation due to the need to rinse cars between the two operations.

Line balancing  The process of assigning tasks to workstations in such a way that the worksta- tions have approximately equal time requirements.

LO6.8 Solve simple line- balancing problems.

Scrubbing 2 minutes

Rinsing 4 minutes

Drying 2 minutes

Line balancing involves assigning tasks to workstations. Usually, each workstation has one worker who handles all of the tasks at that station, although an option is to have several

ste24102_ch06_236-287.indd 262ste24102_ch06_236-287.indd 262 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 263

workers at a single workstation. For purposes of illustration, however, all of the examples and problems in this chapter have workstations with one worker. A manager could decide to use anywhere from one to five workstations to handle five tasks. With one workstation, all tasks would be done at that station; with five stations, for example, one task would be assigned to each station. If two, three, or four workstations are used, some or all of the stations will have multiple tasks assigned to them. How does a manager decide how many stations to use?

The primary determinant is what the line’s cycle time will be. The cycle time is the maxi- mum time allowed at each workstation to perform assigned tasks before the work moves on. The cycle time also establishes the output rate of a line. For instance, if the cycle time is two minutes, units will come off the end of the line at the rate of one every two minutes. Hence, the line’s capacity is a function of its cycle time.

We can gain some insight into task groupings and cycle time by considering a simple example.

Suppose that the work required to fabricate a certain product can be divided up into five elemental tasks, with the task times and precedence relationships as shown in the following diagram:

Cycle time  The maximum time allowed at each workstation to complete its set of tasks on a unit.

0.1 min. 0.7 min. 1.0 min. 0.2 min.0.5 min.

The task times govern the range of possible cycle times. The minimum cycle time is equal to the longest task time (1.0 minute), and the maximum cycle time is equal to the sum of the task times (0.1  �  0.7  �  1.0  �  0.5  �  0.2  �  2.5 minutes). The minimum cycle time would apply if there were five workstations. The maximum cycle time would apply if all tasks were performed at a single workstation. The minimum and maximum cycle times are important because they establish the potential range of output for the line, which we can compute using the following formula:

Output rate

Operating time per day

Cycle time �

(6–1)

Assume that the line will operate for eight hours per day (480 minutes). With a cycle time of 1.0 minute, output would be

480 minutes per day

1.0 minute per unit 480 units per day�

With a cycle time of 2.5 minutes, the output would be

480 minutes per day

2.5 minutes per unit 192 units per day�

Assuming that no parallel activities are to be employed (e.g., two lines), the output selected for the line must fall in the range of 192 units per day to 480 units per day.

As a general rule, the cycle time is determined by the desired output; that is, a desired out- put rate is selected, and the cycle time is computed. If the cycle time does not fall between the maximum and minimum bounds, the desired output rate must be revised. We can compute the cycle time using this equation:

Cycle time

Operating time per day

Desired output rate �

(6–2)

For example, suppose that the desired output rate is 480 units. Using Formula 6–2, the necessary cycle time is

480 minutes per day

480 units per day 1.0 minute per unit�

ste24102_ch06_236-287.indd 263ste24102_ch06_236-287.indd 263 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

264 Chapter Six Process Selection and Facility Layout

The number of workstations that will be needed is a function of both the desired output rate and our ability to combine elemental tasks into workstations. We can determine the theoreti- cal minimum number of stations necessary to provide a specified rate of output as follows:

Cycle time minN

t �

(6–3)

where

Theoretical minimum number of stations

Sum of task times

minN

t

� �

Suppose the desired rate of output is the maximum of 480 units per day. 2 (This will require a cycle time of 1.0 minute.) The minimum number of stations required to achieve this goal is

2.5 minutes per unit

1 minute per unit per station 2.5 stationsminN � �

Because 2.5 stations is not feasible, it is necessary to round up (because 2.5 is the mini- mum) to three stations. Thus, the actual number of stations used will equal or exceed three, depending on how successfully the tasks can be grouped into workstations.

A very useful tool in line balancing is a precedence diagram. Figure  6.9 illustrates a simple precedence diagram. It visually portrays the tasks that are to be performed along with the sequential requirements, that is, the order in which tasks must be performed. The diagram is read from left to right, so the initial task(s) are on the left and the final task is on the right. In terms of precedence requirements, we can see from the diagram, for example, that the only requirement to begin task b is that task a must be finished. However, in order to begin task d, tasks b and c must both be finished. Note that the elemental tasks are the same ones that we have been using.

Now let’s see how a line is balanced. This involves assigning tasks to workstations. Gener- ally, no techniques are available that guarantee an optimal set of assignments. Instead, man- agers employ heuristic (intuitive) rules, which provide good and sometimes optimal sets of assignments. A number of line-balancing heuristics are in use, two of which are described here for purposes of illustration:

1. Assign tasks in order of most following tasks.

2. Assign tasks in order of greatest positional weight. Positional weight is the sum of each task’s time and the times of all following tasks.

Precedence diagram  A diagram that shows elemental tasks and their precedence requirements.

2 At first glance, it might seem that the desired output would logically be the maximum possible output. However, you will see why that is not always the best alternative.

Arrange the tasks shown in Figure 6.9 into three workstations. Use a cycle time of 1.0 minute. Assign tasks in order of the greatest number of followers.

E X A M P L E 1 e celx

mhhe.com/stevenson12e

FIGURE 6.9 A simple precedence diagram a

c

b

d e

0.1 min. 1.0 min.

0.7 min. 0.5 min. 0.2 min.

ste24102_ch06_236-287.indd 264ste24102_ch06_236-287.indd 264 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 265

S O L U T I O N 1. Begin with task a; it has the most following tasks. Assign it to workstation 1. 2. Next, tasks b and c each have two following tasks, but only task c will fit in the time

remaining at workstation 1, so assign task c to workstation 1.

3. Task b now has the most followers, but it will not fit at workstation 1, so assign it to workstation 2.

4. There is no time left at workstation 2, so we move on to workstation 3, assigning task d and then task e to that workstation.

Workstation Time

Remaining Eligible Assign Task

Revised Time Remaining

Station Idle Time

1 1.0 a, c a 0.9 0.9 b, c c 0.2 0.2 none — 0.2 2 1.0 b b 0.0 0.0 3 1.0 d d 0.5 0.5 e e 0.3 0.3 — — 0.3 0.5

The initial “time remaining” for each workstation is equal to the cycle time. For a task to be eligible, tasks preceding it must have been assigned, and the task’s time must not exceed the station’s remaining time.

Example 1 is purposely simple; it is designed to illustrate the basic procedure. Later exam- ples will illustrate tiebreaking, constructing precedence diagrams, and the positional weight method. Before considering those examples, let us first consider some measures of effective- ness that can be used for evaluating a given set of assignments.

Two widely used measures of effectiveness are

1. The percentage of idle time of the line. This is sometimes referred to as the balance delay. It can be computed as follows:

Percentage of idle time

Idle time per cycle

Cycle time 100

actualN �

� �

(6–4)

where

Actual number of stationsactualN �

For the preceding example, the value is

Percentage of idle time

.5

3 1.0 100 16.7%�

� � �

Balance delay  Percentage of idle time of a line.

0.1 min. 1.0 min.

0.5 min. 0.2 min.0.7 min.

Workstation 2

Workstation 3

Workstation 1

a b

c d e

ste24102_ch06_236-287.indd 265ste24102_ch06_236-287.indd 265 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

266 Chapter Six Process Selection and Facility Layout

In effect, this is the average idle time divided by the cycle time, multiplied by 100. Note that cycle time refers to the actual cycle time that is achieved. When the calculated cycle time in Formula 6–2 and the actual bottleneck station time differ, the actual bottleneck station time should be used in all idle time, efficiency, and output (throughput) calcula- tions. The actual bottleneck time dictates the actual pace of the line, whereas the calcu- lated cycle time is just an upper limit on the amount of time that can be loaded into any station.

2. The efficiency of the line. This is computed as follows:

Efficiency 100% Percent idle time� � (6–5a)

Here, Efficiency  �  100%  �  16.7%  �  83.3%. Alternatively, efficiency could be com- puted using Formula 6–5b:

Efficiency

Cycle time Idle time

Cycle time 100actual

actual

N

N �

� �

� �

(6–5b)

Now let’s consider the question of whether the selected level of output should equal the maximum output possible. The minimum number of workstations needed is a function of the desired output rate and, therefore, the cycle time. Thus, a lower rate of output (hence, a longer cycle time) may result in a need for fewer stations. Hence, the manager must consider whether the potential savings realized by having fewer workstations would be greater than the decrease in profit resulting from producing fewer units.

The preceding examples serve to illustrate some of the fundamental concepts of line bal- ancing. They are rather simple; in most real-life situations, the number of branches and tasks is often much greater. Consequently, the job of line balancing can be a good deal more com- plex. In many instances, the number of alternatives for grouping tasks is so great that it is virtually impossible to conduct an exhaustive review of all possibilities. For this reason, many real-life problems of any magnitude are solved using heuristic approaches. The purpose of a heuristic approach is to reduce the number of alternatives that must be considered, but it does not guarantee an optimal solution.

Some Guidelines for Line Balancing In balancing an assembly line, tasks are assigned one at a time to the line, starting at the first workstation. At each step, the unassigned tasks are checked to determine which are eligible for assignment. Next, the eligible tasks are checked to see which of them will fit in the workstation being loaded. A heuristic is used to select one of the tasks that will fit, and the task is assigned. This process is repeated until there are no eligible tasks that will fit. Then the next workstation can be loaded. This continues until all tasks are assigned. The objective is to minimize the idle time for the line subject to technological and output constraints.

Technological constraints tell us which elemental tasks are eligible to be assigned at a particular position on the line. Technological constraints can result from the precedence or ordering relationships among the tasks. The precedence relationships require that certain tasks must be performed before others (and so, must be assigned to workstations before others). Thus, in a car wash, the rinsing operation must be performed before the drying operation. The drying operation is not eligible for assignment until the rinsing operation has been assigned. Technological constraints may also result from two tasks being incompatible (e.g., space restrictions or the nature of the operations may prevent their being placed in the same work center). For example, sanding and painting operations would not be assigned to the same work center because dust particles from the sanding operation could contaminate the paint.

Output constraints, on the other hand, determine the maximum amount of work that a manager can assign to each workstation, and this determines whether an eligible task will

ste24102_ch06_236-287.indd 266ste24102_ch06_236-287.indd 266 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 267

fit at a workstation. The desired output rate determines the cycle time, and the sum of the task times assigned to any workstation must not exceed the cycle time. If a task can be assigned to a workstation without exceeding the cycle time, then the task will fit.

Once it is known which tasks are eligible and will fit, the manager can select the task to be assigned (if there is more than one to choose from). This is where the heuristic rules help us decide which task to assign from among those that are eligible and will fit.

To clarify the terminology, following tasks are all tasks that you would encounter by fol- lowing all paths from the task in question through the precedence diagram. Preceding tasks are all tasks you would encounter by tracing all paths backward from the task in question. In the precedence diagram below, tasks b, d, e, and f are followers of task a. Tasks a, b, and c are preceding tasks for e.

a b

c

e

d

f

The positional weight for a task is the sum of the task times for itself and all its following tasks.

Neither of the heuristics guarantees the best solution, or even a good solution to the line- balancing problem, but they do provide guidelines for developing a solution. It may be useful to apply several different heuristics to the same problem and pick the best (least idle time) solution out of those developed.

E X A M P L E 2 e celx

mhhe.com/stevenson12e

Using the information contained in the table shown, do each of the following:

1. Draw a precedence diagram.

2. Assuming an eight-hour workday, compute the cycle time needed to obtain an output of 400 units per day.

3. Determine the minimum number of workstations required.

4. Assign tasks to workstations using this rule: Assign tasks according to greatest number of following tasks. In case of a tie, use the tiebreaker of assigning the task with the longest processing time first.

Task Immediate

Predecessor Task Time

(in minutes)

a — 0.2 b a 0.2 c — 0.8 d c 0.6 e b 0.3 f d, e 1.0 g f 0.4 h g 0.3 � t   �  3.8

5. Compute the resulting percent idle time and efficiency of the system.

ste24102_ch06_236-287.indd 267ste24102_ch06_236-287.indd 267 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

268 Chapter Six Process Selection and Facility Layout

S O L U T I O N 1. Drawing a precedence diagram is a relatively straightforward task. Begin with activities with no predecessors. We see from the list that tasks a and c do not have predecessors. We build from here.

a

c

Step 1:

a

c

b

d

Step 2: Task b follows a, and d follows c.

a

c

b

d

e

Step 3: Task e follows b.

a

c

b

d

e

f

Step 4: Task f follows e, and d.

a

c

b

d

e

f g h

Step 5: Task g follows f, and h follows g.

2. Cycle time Operating time

Desired output rate

480 minutes per day

400 units per day 1.2 minutes per cycle� � �

3. Cycle time

3.8 minutes per unit

1.2 minutes per cycle per station 3.17 stations (round to 4)minN

t �

� � �

4. Beginning with station 1, make assignments following this procedure: Determine from the precedence diagram which tasks are eligible for assignment. Then determine which of the eligible tasks will fit the time remaining for the station. Use the tiebreaker if necessary. Once a task has been assigned, remove it from consideration. When a station cannot take any more assignments, go on to the next station. Continue until all tasks have been assigned.

Station Time

Remaining Eligible Will Fit Assign

(task time)

Revised Time

Remaining Idle

1 1.2 a, c * a, c * a (0.2) 1.0 1.0 c, b ** c, b ** c (0.8) 0.2 0.2 b, d b b (0.2) 0.0 0 e, d None — 0.0 2 1.2 e, d e, d d (0.6) 0.6 0.6 e e e (0.3) 0.3 0.3 *** f None — 0.3 3 1.2 f f f (1.0) 0.2 0.2 g None — 0.2 4 1.2 g g g (0.4) 0.8 0.8 h h h (0.3) 0.5 0.5 — — — 0.5 1.0 min.

*Neither a nor c has any predecessors, so both are eligible. Task a was assigned since it has more followers. **Once a is assigned, b and c are now eligible. Both will fit in the time remaining of 1.0 minute. The tie cannot be broken by the “most followers” rule, so the longer task is assigned.

***Although f is eligible, this task will not fit, so station 2 is left with 0.3 minute of idle time per 1.2-minute cycle.

ste24102_ch06_236-287.indd 268ste24102_ch06_236-287.indd 268 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 269

These assignments are shown in the following diagram. Note: One should not expect that heuristic approaches will always produce optimal solutions; they merely pro- vide a practical way to deal with complex problems that may not lend themselves to optimizing techniques. Moreover, different heuristics often yield different answers.

Station 1 Station 2 Station 3

a

c d

b

Station 4

g hf

e

5. Percent idle time 1.0 min.

4 1.2 min. 100 20.83%.

Efficiency 100% 20.83% 79.17%

� �

� �

� � �

Other Factors The preceding discussion on line balancing presents a relatively straightforward approach to approximating a balanced line. In practice, the ability to do this usually involves additional considerations, some of which are technical.

Technical considerations include skill requirements of different tasks. If skill require- ments of tasks are quite different, it may not be feasible to place the tasks in the same workstation. Similarly, if the tasks themselves are incompatible (e.g., the use of fire and flammable liquids), it may not be feasible even to place them in stations that are near each other.

Developing a workable plan for balancing a line may also require consideration of human factors as well as equipment and space limitations.

Although it is convenient to treat assembly operations as if they occur at the same rate time after time, it is more realistic to assume that whenever humans are involved, task com- pletion times will be variable. The reasons for the variations are numerous, including fatigue, boredom, and failure to concentrate on the task at hand. Absenteeism also can affect line bal- ance. Minor variability can be dealt with by allowing some slack along the line. However, if more variability is inherent in even a few tasks, that will severely impact the ability to achieve a balanced line.

For these reasons, lines that involve human tasks are more of an ideal than a reality. In practice, lines are rarely perfectly balanced. However, this is not entirely bad, because some unbalance means that slack exists at points along the line, which can reduce the impact of brief stoppages at some workstations. Also, workstations that have slack can be used for new workers who may not be “up to speed.”

Other Approaches Companies use a number of other approaches to achieve a smooth flow of production. One approach is to use parallel workstations. These are beneficial for bottleneck operations which would otherwise disrupt the flow of product as it moves down the line. The bottlenecks may be the result of difficult or very long tasks. Parallel workstations increase the work flow and provide flexibility.

ste24102_ch06_236-287.indd 269ste24102_ch06_236-287.indd 269 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

270 Chapter Six Process Selection and Facility Layout

3 Adapted from Mikell P. Groover, Automation, Production Systems, and Computer-Aided Manufacturing, 2nd ed. © 1987. Reprinted by permission of Pearson Education, Inc., Upper Saddle River, NJ.

Using parallel stations for the third task would result in a cycle time of 1 minute because the output rate at the parallel stations would be equal to that of a single station and allow an output rate for the line of 60 units per hour:

1 min. 30/hr 30/hr 30/hr

Bottleneck

30/hr1 min. 2 min. 1 min.

1 min. 1 min. 1 min.

2 min.

2 min.

60/hr 30/h

r

30/hr

30/hr

30/h r

60/hr

Another approach to achieving a balanced line is to cross-train workers so that they are able to perform more than one task. Then, when bottlenecks occur, the workers with tempo- rarily increased idle time can assist other workers who are temporarily overburdened, thereby maintaining an even flow of work along the line. This is sometimes referred to as dynamic line balancing, and it is used most often in lean production systems.

Still another approach is to design a line to handle more than one product on the same line. This is referred to as a mixed model line. Naturally, the products have to be fairly similar, so that the tasks involved are pretty much the same for all products. This approach offers great flexibility in varying the amount of output of the products. The following reading describes one such line.

flexibility enables its line to easily respond to mar- ket fluctuations while avoiding the costly change- overs that its rivals’ more rigid lines require.

Source: Based on “Betting on the S,” The Wall Street Journal, July 11, 2005, p. B1.

The assembly line in Dingolfing, Germany, where BMW assembles its 7-Series, has built-in flexibility that allows it to easily produce multiple models. Rival car producers typically configure their assembly lines to produce just a single model at a time. In order for them to produce a different model, the line must be shut down so that it can be changed over to be able to produce the different model. BMW’s production

READING BMW’s Strategy: Flexibility

r- e-

Consider this example. 3 A job has four tasks; task times are 1 minute, 1 minute, 2 minutes, and 1 minute. The cycle time for the line would be 2 minutes, and the output rate would be 30 units per hour:

60 minutes per hour

2 minutes per unit 30 units per hour�

ste24102_ch06_236-287.indd 270ste24102_ch06_236-287.indd 270 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 271

6.7 DESIGNING PROCESS LAYOUTS The main issue in designing process layouts concerns the relative positioning of the depart- ments involved. As illustrated in Figure 6.10 , departments must be assigned to locations. The problem is to develop a reasonably good layout; some combinations will be more desirable than others. For example, some departments may benefit from adjacent locations whereas others should be separated. A lab with delicate equipment would not be located near a depart- ment that had equipment with strong vibrations. Conversely, two departments that share some of the same equipment would benefit from being close together.

Layouts can also be influenced by external factors such as the location of entrances, load- ing docks, elevators, windows, and areas of reinforced flooring. Also important are noise levels, safety, and the size and locations of restrooms.

In some instances (e.g., the layouts of supermarkets, gas stations, and fast-food chains), a sufficient number of installations having similar characteristics justify the development of standardized layouts. For example, the use of the same basic patterns in McDonald’s fast-food locations facilitates construction of new structures and employee training. Food preparation, order taking, and customer service follow the same pattern throughout the chain. Installa- tion and service of equipment are also standardized. This same concept has been success- fully employed in computer software products such as Microsoft Windows and the Macintosh Operating System. Different applications are designed with certain basic features in common, so that a user familiar with one application can readily use other applications without having to start from scratch with each new application.

The majority of layout problems involve single rather than multiple locations, and they present unique combinations of factors that do not lend themselves to a standardized approach. Consequently, these layouts require customized designs.

A major obstacle to finding the most efficient layout of departments is the large num- ber of possible assignments. For example, there are more than 87 billion different ways that 14 departments can be assigned to 14 locations if the locations form a single line. Differ- ent location configurations (e.g., 14 departments in a two-by-seven grid) often reduce the number of possibilities, as do special requirements (e.g., the stamping department may have to be assigned to a location with reinforced flooring). Still, the remaining number of lay- out possibilities is quite large. Unfortunately, no algorithms exist to identify the best layout arrangement under all circumstances. Often planners must rely on heuristic rules to guide trial-and-error efforts for a satisfactory solution to each problem.

Measures of Effectiveness One advantage of process layouts is their ability to satisfy a variety of processing require- ments. Customers or materials in these systems require different operations and different sequences of operations, which causes them to follow different paths through the system. Material-oriented systems necessitate the use of variable-path material-handling equipment to move materials from work center to work center. In customer-oriented systems, people must travel or be transported from work center to work center. In both cases, transporta- tion costs or time can be significant. Because of this factor, one of the major objectives in process layout is to minimize transportation cost, distance, or time. This is usually accom- plished by locating departments with relatively high interdepartmental work flow as close together as possible.

LO6.9 Develop simple process layouts.

FIGURE 6.10 Work centers must be assigned to locations

Work centers to Locations be assigned 1 2 3 4 5 6

A B C

D E F

ste24102_ch06_236-287.indd 271ste24102_ch06_236-287.indd 271 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

272 Chapter Six Process Selection and Facility Layout

Other concerns in choosing among alternative layouts include initial costs in setting up the layout, expected operating costs, the amount of effective capacity created, and the ease of modifying the system.

In situations that call for improvement of an existing layout, costs of relocating any work center must be weighed against the potential benefits of the move.

Information Requirements The design of process layouts requires the following information:

1. A list of departments or work centers to be arranged, their approximate dimensions, and the dimensions of the building or buildings that will house the departments.

2. A projection of future work flows between the various work centers.

3. The distance between locations and the cost per unit of distance to move loads between locations.

4. The amount of money to be invested in the layout.

5. A list of any special considerations (e.g., operations that must be close to each other or operations that must be separated).

6. The location of key utilities, access and exit points, loading docks, and so on, in existing buildings.

The ideal situation is to first develop a layout and then design the physical structure around it, thus permitting maximum flexibility in design. This procedure is commonly followed when new facilities are constructed. Nonetheless, many layouts must be developed in existing structures where floor space, the dimensions of the building, location of entrances and eleva- tors, and other similar factors must be carefully weighed in designing the layout. Note that multilevel structures pose special problems for layout planners.

Minimizing Transportation Costs or Distances The most common goals in designing process layouts are minimization of transportation costs or distances traveled. In such cases, it can be very helpful to summarize the necessary data in from-to charts like those illustrated in Tables 6.5 and 6.6 . Table 6.5 indicates the distance between each of the locations, and Table 6.6 indicates actual or projected work flow between each pair. For instance, the distance chart reveals that a trip from location A to location B will involve a distance of 20 meters. (Distances are often measured between department centers.) Oddly enough, the length of a trip between locations A and B may differ depending on the direction of the trip, due to one-way routes, elevators, or other factors. To simplify the discus- sion, assume a constant distance between any two locations regardless of direction. However, it is not realistic to assume that interdepartmental work flows are equal—there is no reason to suspect that department 1 will send as much work to department 2 as department 2 sends to 1. For example, several departments may send goods to packaging, but packaging may send only to the shipping department.

Transportation costs can also be summarized in from-to charts, but we shall avoid that complexity, assuming instead that costs are a direct, linear function of distance.

LOCATION

From To A B C

A 20 40 B 30 C

TABLE 6.5 Distance between locations (meters)

TABLE 6.6 Interdepartmental work flow (loads per day)

DEPARTMENT

From To 1 2 3

Dept. 1 30 170 2 100 3

ste24102_ch06_236-287.indd 272ste24102_ch06_236-287.indd 272 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 273

E X A M P L E 3 e celx

mhhe.com/stevenson12e

Assign the three departments shown in Table 6.6 to locations A, B, and C, which are separated by the distances shown in Table 6.5 , in such a way that transportation cost is minimized. Note that Table 6.6 summarizes the flows in both directions. Use this heuristic: Assign departments with the greatest interdepartmental work flow first to locations that are closest to each other.

S O L U T I O N Ranking departments according to highest work flow and locations according to highest inter- location distances helps in making assignments.

Trip Distance (meters)

Department Pair

Work Flow

A–B 20 1–3 170 B–C 30 2–3 100 A–C 40 1–2 30

From these listings, you can see that departments 1 and 3 have the highest interdepartmen- tal work flow, and that locations A and B are the closest. Thus, it seems reasonable to con- sider assigning 1 and 3 to locations A and B, although it is not yet obvious which department should be assigned to which location. Further inspection of the work flow list reveals that 2 and 3 have higher work flow than 1 and 2, so 2 and 3 should probably be located more closely than 1 and 2. Hence, it would seem reasonable to place 3 between 1 and 2, or at least centralize that department with respect to the other two. The resulting assignments might appear as illustrated in Figure 6.11 .

If the cost per meter to move any load is $1, you can compute the total daily transporta- tion cost for this assignment by multiplying each department’s number of loads by the trip distance, and summing those quantities:

Department Number of

Loads Between Location Distance To: Loads  �  Distance

1 2: 30 A C: 40 30  �  40  �  1,200 3: 170 B: 20 170  �  20  �  3,400 2 3: 100 C B: 30 100 � 30 � 3,000 B: 30 100  �  30  �   3,000

7,600

At $1 per load meter, the cost for this plan is $7,600 per day. Even though it might appear that this arrangement yields the lowest transportation cost, you cannot be absolutely positive of that without actually computing the total cost for every alternative and comparing it to this one. Instead, rely on the choice of reasonable heuristic rules such as those demonstrated above to arrive at a satisfactory, if not optimal, solution.

Closeness Ratings Although the preceding approach is widely used, it suffers from the limitation of focusing on only one objective, and many situations involve multiple criteria. Richard Muther developed a more general approach to the problem, which allows for subjective input from analysis or managers to indicate the relative importance of each combination of department pairs. 4 That

1 3 2

30

170 100

A B C

FIGURE 6.11 Interdepartmental work flows for assigned departments

4 Richard Muther and John Wheeler, “Simplified Systematic Layout Planning,” Factory 120, nos. 8, 9, and 10 (August, September, October 1962), pp. 68–77, 111–119, 101–113, respectively.

ste24102_ch06_236-287.indd 273ste24102_ch06_236-287.indd 273 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

274 Chapter Six Process Selection and Facility Layout

information is then summarized in a grid like that shown in Figure 6.12 . Read the grid in the same way as you would read a mileage chart on a road map, except that letters rather than dis- tances appear at the intersections. The letters represent the importance of closeness for each department pair, with A being the most important and X being an undesirable pairing. Thus, in the grid it is “absolutely necessary” to locate 1 and 2 close to each other because there is an A at the intersection of those departments on the grid. On the other hand, 1 and 4 should not be close together because their intersection has an X. In practice, the letters on the grid are often accompanied by numbers that indicate the reason for each assignment; they are omitted here to simplify the illustration. Muther suggests the following list:

1. They use same equipment or facilities.

2. They share the same personnel or records.

3. Required sequence of work flow.

4. Needed for ease of communication.

5. Would create unsafe or unpleasant conditions.

6. Similar work is performed.

FIGURE 6.12 A Muther grid Department 1

Department 2

Department 3

Department 4

Department 5

Department 6

A

E

X

O

A

X

I

X

A

U

A

A

O

U

A

Code

A E I O U X

Degree of closeness

Absolutely necessary Very important Important Ordinary importance Unimportant Undesirable

E X A M P L E 4 Assign the six departments in Figure 6.12 to a 2  �  3 set of locations using the heuristic rule: Assign critical departments first, because they are the most important.

S O L U T I O N Critical pairs of departments are those with A or X ratings. Prepare a list of those by referring to the grid:

A Links

X Links

1–2 1–4 1–3 3–6 2–6 3–4 3–5 4–6 5–6

Next, form a cluster of A links, beginning with the department that appears most frequently in the A list (in this case, 6). For instance:

2

6

4

5

ste24102_ch06_236-287.indd 274ste24102_ch06_236-287.indd 274 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 275

Take the remaining A links in order, and add them to this main cluster where possible, rear- ranging the cluster as necessary. Form separate clusters for departments that do not link with the main cluster. In this case, all link with the main cluster.

1 4

3 6

2 6 4

53 1

1 2 6

453

Next, graphically portray the X links:

Observe that, as it stands, the cluster of A links also satisfies the X separations. It is a fairly simple exercise to fit the cluster into a 2  �  3 arrangement:

Note that the lower-level ratings have also been satisfied with this arrangement, even though no attempt was made to explicitly consider the E and I ratings. Naturally, not every problem will yield the same results, so it may be necessary to do some additional adjusting to see if improvements can be made, keeping in mind that the A and X assignments deserve the great- est consideration. Note that departments are considered close not only when they touch side to side but also when they touch corner to corner.

The value of this rating approach is that it permits the use of multiple objectives and sub- jective inputs. Its limitations relate to the use of subjective inputs in general: They are impre- cise and unreliable.

Process selection choices often have strategic implications for organizations. They can affect cost, qual- ity, productivity, customer satisfaction, and competitive advantage. Process types include job shop, batch processing, repetitive processing, continuous processing, and projects. Process type determines how work is organized, and it has implications for the entire organization and its supply chain. Process type and layout are closely related. Except for projects, process selection is usually a function of the volume and variety needed.

Layout decisions are an important aspect of the design of operations systems, affecting operating costs and efficiency. Layout decisions are often closely related to process selection decisions.

Product layouts are geared to high-volume output of standardized items. Workers and equipment are arranged according to the technological sequence required by the product or service involved. Emphasis in design is on work flow through the system, and specialized processing and handling equipment is often used. Product layouts are highly vulnerable to breakdowns. Preventive maintenance is used to reduce the occurrence of breakdowns. Software is available for large or complex designs.

Process layouts group similar activities into departments or other work centers. These systems can handle a wide range of processing requirements and are less susceptible to breakdowns. However, the variety of processing requirements necessitates continual routing and scheduling and the use of variable- path material-handling equipment. The rate of output is generally much lower than that of product layouts.

Fixed-position layouts are used when size, fragility, cost, or other factors make it undesirable or impractical to move a product through a system. Instead, workers, equipment, and materials are brought to the product.

SUMMARY

ste24102_ch06_236-287.indd 275ste24102_ch06_236-287.indd 275 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

276 Chapter Six Process Selection and Facility Layout

1. Process choice is demand driven.

2. Process type and layout are a function of expected demand volume and the degree of customiza- tion that will be needed.

3. Each process type and layout type has advantages and limitations that should be clearly under- stood when making process selection and layout decisions.

4. Process design is critical in a product-focused system, whereas managing is critical in a process- focused system.

KEY POINTS

The main design efforts in product layout development focus on dividing up the work required to produce a product or service into a series of tasks that are as nearly equal as possible. The goal is to achieve a high degree of utilization of labor and equipment. In process layout, design efforts often focus on the relative positioning of departments to minimize transportation costs or to meet other requirements concerning the proximity of certain department pairs.

The large number of possible alternatives to layout problems prevents an examination of each one. Instead, heuristic rules guide discovery of alternatives. The solutions thus obtained are usually satisfac- tory although not necessarily optimal. Software packages are available to reduce the effort required to obtain solutions to layout problems, but these too rely largely on heuristic methods.

assembly line, 251 automation, 245 balance delay, 265 cellular production, 256 computer-aided manufacturing (CAM), 247 computer-integrated manufacturing (CIM), 248 cycle time, 263

fixed-position layout, 254 flexible manufacturing system (FMS), 248 group technology, 257 intermittent processing, 253 line balancing, 262 numerically controlled (N/C) machines, 247 precedence diagram, 264

process layout, 253 product layout, 250 product or service profiling, 244 production line, 251 project, 241 technological innovation, 244 technology, 244

KEY TERMS

SOLVED PROBLEMS

The tasks shown in the following precedence diagram are to be assigned to workstations with the intent of minimizing idle time. Management has designed an output rate of 275 units per day. Assume 440 minutes are available per day.

a. Determine the appropriate cycle time.

b. What is the minimum number of stations possible?

c. Assign tasks using the “positional weight” rule: Assign tasks with highest following times (including a task’s own time) first. Break ties using greatest number of following tasks.

d. Compute efficiency.

Problem 1

a c e

b d f

g h i

0.3 minute 0.2 minute 0.1 minute 0.5 minute 0.3 minute0.4 minute

0.6 minute 0.6 minute1.2 minutes

a. Cycle time Operating time

Desired output

440 minutes per day

275 units per day 1.6 minutes� � � Solution per unit

ste24102_ch06_236-287.indd 276ste24102_ch06_236-287.indd 276 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 277

b. Cycle time

4.2

1.6 minutes 2.625 (round to 3)N

t �

� � �

c. Add positional weights (task time plus the sum of all following times) to the diagram. Start at the right end and work backward:

(1.8) 0.3 minute

(1.1) 0.2 minute

(0.9) 0.1 minute

(0.8) 0.5 minute

(0.3) 0.3 minute

(1.5) 0.4 minute

0.6 minute (3.2)

0.6 minute (1.4)

1.2 minutes (2.6)

a c e

b d f

g h i

Station Time

Remaining * Eligible Will Fit Assign

Task/Time Station

Idle Time

1 1.6 a, b a, b b/0.6

1.0 a, d a a/0.3

0.7 c, d c c/0.4

0.3 e, d e e/0.2

0.1 g, d g g/0.1

0 — — — 0

2 1.6 d d d/1.2

0.4 f none none 0.4

3 1.6 f f f/0.6

1.0 h h h/0.5

0.5 i i i/0.3

0.2 — — — 0.2

0.6

*The initial time for each station is the cycle time computed in part a.

The resulting assignments are shown below.

Station 1 Station 2 Station 3

Time = 1.6 minutes

Time = 1.2 minutes

Time = 1.4 minutes

a

d f

g h

b

ic e

d. Efficiency 100% Percent idle time 100% 0.6 min.

3 1.6 min. 100 87.5%.� � � �

� �

Problem 2 Assign nine automobile service departments to bays in a 3  �  3 grid so that the closeness ratings in the following matrix are satisfied. (The unimportant and ordinary-importance ratings have been omitted to simplify the example.) The location of department 4 must be in the upper right-hand cor- ner of the grid to satisfy a town ordinance.

ste24102_ch06_236-287.indd 277ste24102_ch06_236-287.indd 277 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

278 Chapter Six Process Selection and Facility Layout

Solution Note that department 1 has many A ratings, making it a strong candidate for the center position in the grid. We can form a cluster of departments that should be close together:

Next, we can identify departmental pairings that should be avoided:

These departments should be spaced around the perimeter of the grid. After a bit of trial and error, the final grid shown below emerged. Check it against the rating matrix to see if it satisfies the ratings.

1

9 8

7

6

6

5

4

3 2

6 8

4

3

=

=

=5

9

2=

=

9 1 6

578

2 3 4

Five departments are to be assigned to locations B–F in the grid. (For technical reasons, department 6 must be assigned to location A.) Transportation cost is $2 per foot. The objective is to minimize total transportation cost. Information on interdepartmental work flows and distances between locations is shown in the following tables. Assign departments with the greatest interdepartmental work flow first.

Problem 3

DISTANCE BETWEEN LOCATIONS (FEET)

From To A B C D E F

A — 50 100 50 80 130 B — 50 90 40 70 C — 140 60 50 D — 50 120 E — 50 F —

Department 1

Department 2

Department 3

Department 4

Department 5

Department 6

Department 7

Department 8

Department 9

A E

X

A

A

X

A

X

A I

A

A

E

X

X

ste24102_ch06_236-287.indd 278ste24102_ch06_236-287.indd 278 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 279

NUMBER OF TRIPS PER DAY BETWEEN CENTERS

From To 1 2 3 4 5 6

1 — 125 62 64 25 50 2 — 10 17 26 54 3 — 2 0 20 4 — 13 2 5 — 5 6 —

Solution First either rank or arrange the work flows from high to low. Here they have been arranged from high to low.

Dept. Work Flow Dept. Work Flow

1–2 125 2–4 17

1–4 64 4–5 13

1–3 62 2–3 10

2–6 54 5–6 5

1–6 50 3–4 2

2–5 26 4–6 2

1–5 25 3–5 0

3–6 20

From this, we can see that departments 1 and 2 have the greatest interdepartmental work flow, so they should be close, perhaps at B and E. Next, work flows for 1–3 and 1–4 are high. Note, though, that the work flow for 3–4 is low, suggesting that they need not be close. Instead, we would place them on either side of department 1. Note also that 3–4 is only 2, 3–5 is 0, while 3–6 is 20 and 4–5 is 13. Hence, place department 3 at location D, department 4 at location F, and department 5 at location C.

A Dept. 6

D E F

B C

A Dept. 6

D Dept. 3

E Dept. 1

F Dept. 4

B Dept. 2

C Dept. 5

Total cost:

Trip b

Distance c

Frequency (b  �  c  �  $2) 

Cost

1–2 (B–E)      40 125 $10,000

1–3 (D–E)      50 62 6,200

1–4 (F–E)       50 64 6,400

1–5 (E–C)      60 25 3,000

1–6 (A–E)     80 50 8,000

2–3 (B–D)     90 10 1,800

2–4 (B–F)     70 17 2,380

2–5 (B–C)     50 26 2,600

2–6 (A–B)     50 54 5,400

3–4 (F–D) 120 2 480

3–5 (D–C) 140 0 0

3–6 (A–D)    50 20 2,000

4–5 (C–F)     50 13 1,300

4–6 (A–F)  130 2 520

5–6 (A–C) 100 5 1,000

$51,080

ste24102_ch06_236-287.indd 279ste24102_ch06_236-287.indd 279 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

280 Chapter Six Process Selection and Facility Layout

1. Name three major trade-offs in process selection.

2. What trade-offs are involved when deciding how often to rebalance an assembly line?

3. Who needs to be involved in process selection?

4. Who needs to be involved in layout design?

5. In what ways does technology have an impact on process selection? How can technology impact layout decisions?

TAKING STOCK

1. Explain the importance of process selection in system design.

2. Briefly describe the five process types, and indicate the kinds of situations in which each would be used.

3. Briefly discuss the advantages and disadvantages of automation.

4. Briefly describe computer-assisted approaches to production.

5. What is a flexible manufacturing system, and under what set of circumstances is it most appropriate?

6. Why is management of technology important?

7. Why might the choice of equipment that provides flexibility sometimes be viewed as a management cop-out?

8. What are the trade-offs that occur when a process layout is used? What are the trade-offs that occur when a product layout is used?

9. List some common reasons for redesigning layouts.

10. Briefly describe the two main layout types.

11. What are the main advantages of a product layout? The main disadvantages?

12. What are the main advantages of a process layout? The main disadvantages?

13. What is the goal of line balancing? What happens if a line is unbalanced?

14. Why are routing and scheduling continual problems in process layouts?

15. Compare equipment maintenance strategies in product and process layouts.

16. Briefly outline the impact that job sequence has on each of the layout types.

17. The City Transportation Planning Committee must decide whether to begin a long-term project to build a subway system or to upgrade the present bus service. Suppose you are an expert in fixed- path and variable-path material-handling equipment, and the committee seeks your counsel on this matter. What are the advantages and limitations of the subway and bus systems?

18. Identify the fixed-path and variable-path material-handling equipment commonly found in supermarkets.

19. What are heuristic approaches, and why are they used in designing layouts?

20. Why are product layouts atypical in service environments?

21. According to a study by the Alliance of American Insurers, it costs more than three times the original purchase price in parts and labor to reconstruct a wrecked Chevrolet. Explain the reasons for this large discrepancy in terms of the processes used to assemble the original car and those required to reconstruct the wrecked car.

22. Name some ways that a layout can help or hinder productivity.

23. What is cellular manufacturing? What are its main benefits and limitations?

24. What is group technology?

25. Explain the consequences of task time variability on line balancing.

DISCUSSION AND REVIEW QUESTIONS

1. Name two unethical behaviors related to process selection and two related to layout, and the ethical principles they violate (see Chapter 1).

2. Layout decisions affect a wide range of facilities, from factories, supermarkets, offices, department stores, and warehouses, to malls, parking lots and garages, and kitchens. Layout is also important in the design of some products such as the interiors of automobiles and the arrangement of components inside computers and other electronic devices. Select three different items from this list, or other similar items, and explain for each what the four or five key considerations for layout design are.

3. What are the risks of automating a production process? What are the risks for a service process?

CRITICAL THINKING EXERCISES

ste24102_ch06_236-287.indd 280ste24102_ch06_236-287.indd 280 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 281

4. Consider an assembly line such as the burrito assembly line at Chipotle Mexican Grill. During slow times of the day, one server can handle assembly, but during very busy times, having many serv- ers would be prudent. Explain why either approach wouldn’t work all the time, and the benefit of matching the number of servers to the pace of customer arrivals.

1.4

a

0.5

b

0.7

d

0.6

c 0.5

1.0

g

0.5

h

0.8

e

f

a

d

f

b c

3

7 4 9 5

5 6

2 4

e h i

g

1. An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day. a. What are the minimum and maximum cycle times? b. What range of output is theoretically possible for the line? c. What is the minimum number of workstations needed if the maximum output rate is to be sought? d. What cycle time will provide an output rate of 125 units per day? e. What output potential will result if the cycle time is (1) 9 minutes? (2) 15 minutes?

2. A manager wants to assign tasks to workstations as efficiently as possible and achieve an hourly output of 331⁄3 units. Assume the shop works a 60-minute hour. Assign the tasks shown in the accompanying precedence diagram (times are in minutes) to workstations using the following rules: a. In order of most following tasks. Tiebreaker: greatest positional weight. b. In order of greatest positional weight. Tiebreaker: most following tasks. c. What is the efficiency?

PROBLEMS

3. A manager wants to assign tasks to workstations as efficiently as possible and achieve an hourly output of four units. The department uses a working time of 56 minutes per hour. Assign the tasks shown in the accompanying precedence diagram (times are in minutes) to workstations using the following rules: a. In order of most following tasks. Tiebreaker: greatest positional weight. b. In order of greatest positional weight. Tiebreaker: most following tasks. c. What is the efficiency?

4. A producer of inkjet printers is planning to add a new line of printers, and you have been asked to balance the process, given the following task times and precedence relationships. Assume that cycle time is to be the minimum possible.

Task Length

(minutes) Immediate

Predecessor

a 0.2 —

b 0.4 a

c 0.3 —

d 1.3 b, c

e 0.1 —

f 0.8 e

g 0.3 d, f

h 1.2 g

ste24102_ch06_236-287.indd 281ste24102_ch06_236-287.indd 281 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

282 Chapter Six Process Selection and Facility Layout

a. Do each of the following: (1) Draw the precedence diagram. (2) Assign tasks to stations in order of most following tasks. Tiebreaker: greatest positional weight. (3) Determine the percentage of idle time. (4) Compute the rate of output in printers per day that could be expected for this line assuming

a 420-minute working day. b. Answer these questions:

(1) What is the shortest cycle time that will permit use of only two workstations? Is this cycle time feasible? Identify the tasks you would assign to each station.

(2) Determine the percentage of idle time that would result if two stations were used. (3) What is the daily output under this arrangement? (4) Determine the output rate that would be associated with the maximum cycle time.

5. As part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of 240 units per eight-hour day. Task times and precedence relationships are as follows:

Task Duration (minutes)

Immediate Predecessor

a 0.2 —

b 0.4 a

c 0.2 b

d 0.4 —

e 1.2 d

f 1.2 c

g 1.0 e, f

Task Length

(minutes) Immediate

Predecessor

a 0.1 —

b 0.2 a

c 0.9 b

d 0.6 c

e 0.1 —

f 0.2 d, e

g 0.4 f

h 0.1 g

i 0.2 h

j 0.7 i

k 0.3 j

l 0.2 k

Do each of the following: a. Draw the precedence diagram. b. Determine the minimum cycle time, the maximum cycle time, and the calculated cycle time. c. Determine the minimum number of stations needed. d. Assign tasks to workstations on the basis of most following tasks. Use shortest processing time

as a tiebreaker. If ties still exist, assume indifference in choice. e. Compute the percentage of idle time for the assignment in part d.

6. Twelve tasks, with times and precedence requirements as shown in the following table, are to be assigned to workstations using a cycle time of 1.5 minutes. Two heuristic rules will be tried:

(1) greatest positional weight, and (2) most following tasks. In each case, the tiebreaker will be shortest processing time.

a. Draw the precedence diagram for this line. b. Assign tasks to stations under each of the two rules. c. Compute the percentage of idle time for each rule.

ste24102_ch06_236-287.indd 282ste24102_ch06_236-287.indd 282 11/28/13 11:46 PM11/28/13 11:46 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 283

7. For the set of tasks given below, do the following: a. Develop the precedence diagram. b. Determine the minimum cycle time and then calculate the cycle time for a desired output of

500 units in a seven-hour day. Why might a manager use a cycle time of 50 seconds? c. Determine the minimum number of workstations for output of 500 units per day. d. Balance the line using the greatest positional weight heuristic. Break ties with the most

following tasks heuristic. Use a cycle time of 50 seconds. e. Calculate the percentage idle time for the line.

Task Immediate

Predecessor Task Time

a — 0.5

b a 1.4

c a 1.2

d a 0.7

e b, c 0.5

f d 1.0

g e 0.4

h g 0.3

i f 0.5

j e, i 0.8

k h, j 0.9

m k 0.3

Task Task Time (seconds)

Immediate Predecessor

A 45 —

B 11 A

C 9 B

D 50 —

E 26 D

F 11 E

G 12 C

H 10 C

I 9 F, G, H

J 10 I

193

8. A shop works a 400-minute day. The manager of the shop wants an output of 200 units per day for the assembly line that has the elemental tasks shown in the table. Do the following: a. Construct the precedence diagram. b. Assign tasks according to the most following tasks rule. Break ties with the greatest positional

weight rule. c. Assign tasks according to the greatest positional weight rule. Break ties with the most follow-

ing tasks rule. d. Compute the balance delay for each rule. Which one yields the better set of assignments in this

instance?

9. Arrange six departments into a 2  �  3 grid so that these conditions are satisfied: 1 close to 2, 5 close to 2 and 6, 2 close to 5, and 3 not close to 1 or 2.

10. Using the information given in the preceding problem, develop a Muther-type grid using the letters A, O, and X. Assume that any pair of combinations not mentioned have an O rating.

11. Using the information in the following grid, determine if the department locations shown are appropriate. If not, modify the assignments so that the conditions are satisfied.

ste24102_ch06_236-287.indd 283ste24102_ch06_236-287.indd 283 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

284 Chapter Six Process Selection and Facility Layout

12. Arrange the eight departments shown in the accompanying Muther grid into a 2  �  4 format. Note: Department 1 must be in the location shown.

Department 1

Department 2

Department 3

Department 4

Department 5

Department 6

Department 7

Department 8

X

O

A

E

O

A

O

A

A

X

A

A

A

E

A

A

O

E

I

A

A

X

E

5 42

8 61

37

Department 1

Department 2

Department 3

Department 4

Department 5

Department 6

Department 7

Department 8

E

A

U

U

X

E

A

E

E

X

A

U

A

A

A

I

O

A

X

A

X

E

X

X

A

U

A

O

1

Department 1

Department 2

Department 3

Department 4

Department 5

Department 6

Department 7

Department 8

Department 9

X

X

X

X

X

E

A

X

E

A

X

A

X

X

A

I

U

A

A

U

A

X

A

X

X

U

A

E

E

A

A

E

A

U

A

E

13. Arrange the departments so they satisfy the conditions shown in the following rating grid into a 3  �  3 format. Place department 5 in the lower left corner of the 3  �  3 grid.

ste24102_ch06_236-287.indd 284ste24102_ch06_236-287.indd 284 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 285

14. a. Determine the placement of departments for a newly designed facility that will minimize total transportation costs using the data in the following tables. Assume that reverse distances are the same. The locations are shown in the grid. Use a cost of $1 per trip yard.

B

E 3D

H

C

GF

A 1

b. Suppose the company has revised its plans for the processes described in part a to accom- modate technological process changes. Determine the placement of departments that will now minimize total travel cost. Use the distances shown in part a, but use the following new matrix of daily trips between departments.

Location A

Location B

Location C

Location D

DISTANCE BETWEEN LOCATIONS (yards)

NUMBER OF TRIPS PER DAY BETWEEN

DEPARTMENTS

From To A B C D From To 1 2 3 4

A — 40 80 70 1 — 10 20 80

B — 40 50 2 — 40 90

C — 60 3 — 55

D — 4 —

NUMBER OF TRIPS PER DAY BETWEEN

DEPARTMENTS

From To A B C D

1 — 20 20 40

2 — 10 50

3 — 60

4 —

15. Eight work centers must be arranged in an L-shaped building. The locations of centers 1 and 3 are assigned as shown in the accompanying diagram. Assuming transportation costs are $1 per load per meter, develop a suitable layout that minimizes transportation costs using the given informa- tion. Compute the total cost. (Assume the reverse distances are the same.)

DISTANCE (meters)

From To A B C D E F G H

A — 40 40 60 120 80 100 110 B — 60 40 60 140 120 130 C — 45 85 40 70 90 D — 40 50 40 45 E — 90 50 40 F — 40 60 G — 40 H —

LOADS PER DAY

From To 1 2 3 4 5 6 7 8

1 — 10 5 90 370 135 125 0 2 — 360 120 40 115 45 120 3 — 350 110 40 20 200 4 — 190 70 50 190 5 — 10 40 10 6 — 50 20 7 — 20 8 —

ste24102_ch06_236-287.indd 285ste24102_ch06_236-287.indd 285 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

286 Chapter Six Process Selection and Facility Layout

16. Develop a process layout that will minimize the total distance traveled by patients at a medical clinic, using the following information on projected departmental visits by patients and distance between locations. Assume a distance of 35 feet between the reception area and each potential location. Use the format shown.

Reception

B

C D

E

FA

17. Ten labs will be assigned to the circular layout shown. Recalling a similar layout’s congestion in the halls, the new lab manager has requested an assignment that will minimize traffic between offices. Department 1 must be at location A. Develop a suitable layout using the following information.

DISTANCE BETWEEN LOCATIONS (feet)

From To A B C D E F

A — 40 80 100 120 160 B — 40 60 80 120 C — 20 40 80 D — 20 40 E — 40 F —

TRIPS BETWEEN DEPARTMENTS (per day)

To Reception 1 2 3 4 5 6

Reception — 20 50 210 20 10 130

1 10 — 0 40 110 80 50 2 40 — 0 50 40 120 3 10 0 — 10 250 10 4 0 — 40 90 5 10 — 20 6 30 —

NUMBER OF TRIPS PER DAY BETWEEN DEPARTMENTS

From To 1 2 3 4 5 6 7 8 9 10

1 — 40 51 26 23 9 20 12 11 35 2 — 37 16 27 15 18 18 18 36 3 — 18 20 14 50 18 25 36 4 — 35 14 14 22 23 31 5 — 24 14 13 21 25 6 — 17 44 42 25 7 — 14 33 40 8 — 43 35 9 — 47

10 —

ste24102_ch06_236-287.indd 286ste24102_ch06_236-287.indd 286 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

Chapter Six Process Selection and Facility Layout 287

Francis, Richard L., Leon F. McGinnis Jr., and John A. White. Facility Layout and Location: An Analytical Approach. 3rd ed. Upper Saddle River, NJ: Prentice Hall, 2001.

Groover, Mikell P. Automation, Production Systems, and Computer-Aided Manufacturing. 3rd ed. Upper Saddle River, NJ: Prentice Hall, 2007.

Pinto, J. A Short History of Automation Growth. JimPinto.com

Stephens, Matthew P., and Fred E. Meyers. Manufac- turing Facilities Design & Material Handling. 5th ed. West Lafayette, IN: Purdue University Press, 2013.

Zijlstra, Emma, and Mark P. Mobach. ”The Influence of Facility Layout on Operations Explored.” Journal of Facilities Management 9 (2011), pp. 127-144.

SELECTED BIBLIOGRAPHY AND FURTHER

READINGS

J

I

H

GF

E

D

C

B

Elevators

1A

18. Rebalance the assembly line in Problem 7. This time, use the longest operation time heuristic. Break ties with the most following tasks heuristic. What is the percentage idle time for your line?

ste24102_ch06_236-287.indd 287ste24102_ch06_236-287.indd 287 11/1/13 12:22 PM11/1/13 12:22 PM

Final PDF to printer

288

C H A P T E R

7

LEARNING OBJECTIVES After completing this chapter, you should be able to:

LO7.1 Explain the importance of work design.

LO7.2 Compare and contrast the two basic approaches to job design.

LO7.3 Discuss the advantages and disadvantages of specialization.

LO7.4 Describe behavioral approaches to job design.

LO7.5 Discuss the impact of working conditions on job design.

LO7.6 Compare the advantages and disadvantages of time-based and output-based pay systems.

LO7.7 Explain the purpose of methods analysis and describe how methods studies are performed.

LO7.8 Describe four commonly used techniques for motion study.

LO7.9 Define a standard time.

LO7.10 Describe and compare time study methods and perform calculations.

LO7.11 Describe work sampling and perform calculations.

LO7.12 Compare stopwatch time study and work sampling.

Work Design and Measurement

CHAPTER OUTLINE

7.1 Introduction, 289

7.2 Job Design, 289 Specialization, 290

Behavioral Approaches to Job Design, 291

Motivation, 291

Teams, 292

Ergonomics, 293

7.3 Quality of Work Life, 294 Working Conditions, 294

Compensation, 296

7.4 Methods Analysis, 299

7.5 Motion Study, 303

7.6 Work Measurement, 305 Stopwatch Time Study, 306

Standard Elemental Times, 311

Predetermined Time Standards, 311

Work Sampling, 312

7.7 Operations Strategy, 315

Case: Making Hotplates, 323

Supplement: Learning Curves, 325

ste24102_ch07_288-324.indd 288ste24102_ch07_288-324.indd 288 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

289

This chapter has four major sections: job design, quality of work life, methods analysis, and work measurement. As you read this chapter, note how decisions in other design areas have an impact on work design. For example, product

or service design decisions in large measure determine the kinds of activities workers will be involved with. Similarly, layout decisions often influence work design. Process layouts tend to necessitate broader job content than product layouts. The implication of these interrelationships is that it is essential to adopt a systems approach to design; decisions in one area must be related to the overall system.

7.1 INTRODUCTION The importance of work design is underscored by an organization’s dependence on human efforts (i.e., work) to accomplish its goals. Furthermore, many of the topics in this chapter are especially relevant for productivity improvement and continuous improvement.

7.2 JOB DESIGN Job design involves specifying the content and methods of jobs. Job designers focus on what will be done in a job, who will do the job, how the job will be done, and where the job will be done. The objectives of job design include productivity, safety, and quality of work life.

Current practice in job design contains elements of two basic schools of thought. One might be called the efficiency school because it emphasizes a systematic, logical approach to job design; the other is called the behavioral school because it emphasizes satisfaction of wants and needs.

The efficiency approach, a refinement of Frederick Winslow Taylor’s scientific management concepts, received considerable emphasis in the past. The behavioral

LO7.1 Explain the importance of work design.

LO7.2 Compare and contrast the two basic approaches to job design.

Job design  The act of specify- ing the contents and methods of jobs.

ste24102_ch07_288-324.indd 289ste24102_ch07_288-324.indd 289 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

290 Chapter Seven Work Design and Measurement

approach followed and has continued to make inroads into many aspects of job design. It is noteworthy that specialization is a primary issue of disagreement between the efficiency and behavioral approaches.

Specialization The term specialization describes jobs that have a very narrow scope. Examples range from assembly lines to medical specialties. College professors often specialize in teaching certain courses, some auto mechanics specialize in transmission repair, and some bakers specialize in wedding cakes. The main rationale for specialization is the ability to concentrate one’s efforts and thereby become proficient at that type of work.

Sometimes the amount of knowledge or training required of a specialist and the complex- ity of the work suggest that individuals who choose such work are very happy with their jobs. This seems to be especially true in the “professions” (e.g., doctors, lawyers, professors). At the other end of the scale are assembly-line workers, who are also specialists, although much less glamorous. The advantage of these highly specialized jobs is that they yield high produc- tivity and relatively low unit costs, and they are largely responsible for the high standard of living that exists today in industrialized nations.

Unfortunately, many of the lower-level jobs can be described as monotonous or down- right boring, and are the source of much of the dissatisfaction among many industrial workers. While some workers undoubtedly prefer a job with limited requirements and responsibility for making decisions, others are not capable of handling jobs with greater scopes. Nonetheless, many workers are frustrated, and this manifests itself in turnover and absenteeism. In the automotive industry, for example, absenteeism runs as high as 20 percent. Workers may also take out their frustrations through disruptive tactics such as deliberate slowdowns.

The seriousness of these problems caused job designers and others to seek ways of alle- viating them. Some of those approaches are discussed in the following sections. Before we turn to them, note that the advantages and disadvantages of specialization are summarized in Table 7.1 .

Specialization  Work that concentrates on some aspect of a product or service.

LO7.3 Discuss the advan- tages and disadvantages of specialization.

Correct positioning of equipment and tools can help reduce fatigue and increase employee productivity. Here, an ergonomist from Humantech Inc., in Ann Arbor, Michigan, obtains workstation measurements to ensure proper height and accessibility for employees.

ste24102_ch07_288-324.indd 290ste24102_ch07_288-324.indd 290 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

Chapter Seven Work Design and Measurement 291

Behavioral Approaches to Job Design In an effort to make jobs more interesting and meaningful, job designers frequently consider job enlargement, job rotation, job enrichment, and increased use of mechanization.

Job enlargement means giving a worker a larger portion of the total task. This constitutes horizontal loading —the additional work is on the same level of skill and responsibility as the original job. The goal is to make the job more interesting by increasing the variety of skills required and by providing the worker with a more recognizable contribution to the overall output. For example, a production worker’s job might be expanded so that he or she is respon- sible for a sequence of activities instead of only one activity.

Job rotation means having workers periodically exchange jobs. A firm can use this approach to avoid having one or a few employees stuck in monotonous jobs. It works best when workers can be transferred to more interesting jobs; there is little advantage in hav- ing workers exchange one boring job for another. Job rotation allows workers to broaden their learning experience and enables them to fill in for others in the event of sickness or absenteeism.

Job enrichment involves an increase in the level of responsibility for planning and coor- dination tasks. It is sometimes referred to as vertical loading. An example of this is to have stock clerks in supermarkets handle reordering of goods, thus increasing their responsibilities. The job enrichment approach focuses on the motivating potential of worker satisfaction.

Job enlargement and job enrichment are also used in lean operations (covered in Chapter 14), where workers are cross-trained to be able to perform a wider variety of tasks and given more authority to manage their jobs.

The importance of these approaches to job design is that they have the potential to increase the motivational power of jobs by increasing worker satisfaction through improvement in the quality of work life.

Motivation Motivation is a key factor in many aspects of work life. Not only can it influence quality and productivity, it also contributes to the work environment. People work for a variety of reasons in addition to compensation. Other reasons include socialization, self-actualization, status, the physiological aspects of work, and a sense of purpose and accomplishment. Awareness of these factors can help management to develop a motivational framework that encourages workers to respond in a positive manner to the goals of the organization. A detailed discussion of motivation is beyond the scope of this book, but its importance to work design should be obvious.

Another factor that influences motivation, productivity, and employee–management relations is trust. In an ideal work environment, there is a high level of trust between workers

LO7.4 Describe behavioral approaches to job design.

Job enlargement  Giving a worker a larger portion of the total task, by horizontal loading.

Job rotation  Workers periodi- cally exchange jobs.

Job enrichment  Increasing responsibility for planning and coordination tasks, by vertical loading.

TABLE 7.1 Major advantages and disadvantages of specialization in business

Advantages

For management: 1. Simplifies training 2. High productivity 3. Low wage costs

For employees: 1. Low education and skill requirements 2. Minimum responsibilities 3. Little mental effort needed

Disadvantages For management: 1. Difficult to motivate quality 2. Worker dissatisfaction, possibly resulting in

absenteeism, high turnover, disruptive tactics, poor attention to quality

For employees: 1. Monotonous work 2. Limited opportunities for advancement 3. Little control over work 4. Little opportunity for self-fulfillment

ste24102_ch07_288-324.indd 291ste24102_ch07_288-324.indd 291 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

292 Chapter Seven Work Design and Measurement

and managers. When managers trust employees, there is a greater tendency to give employees added responsibilities. When employees trust management, they are more likely to respond positively. Conversely, when they do not trust management, they are more likely to respond in less desirable ways.

Teams The efforts of business organizations to become more productive, competitive, and customer- oriented have caused them to rethink how work is accomplished. Significant changes in the structure of some work environments have been the increasing use of teams and the way workers are paid, particularly in lean production systems.

In the past, nonroutine job assignments, such as dealing with customer complaints or improving a process, were typically given to one individual or to several individuals who reported to the same manager. More recently, nonroutine assignments are being given to teams who develop and implement solutions to problems.

There are a number of different forms of teams. One is a short-term team formed to col- laborate on a topic such as quality improvement, product or service design, or solving a prob- lem. Team members may be drawn from the same functional area or from several functional areas, depending on the scope of the problem. Other teams are more long term. One form of long-term team that is increasingly being used, especially in lean production settings, is the self-directed team.

Self-directed teams, sometimes referred to as self-managed teams, are designed to achieve a higher level of teamwork and employee involvement. Although such teams are not given absolute authority to make all decisions, they are typically empowered to make changes in the work processes under their control. The underlying concept is that the work- ers, who are close to the process and have the best knowledge of it, are better suited than management to make the most effective changes to improve the process. Moreover, because they have a vested interest and personal involvement in the changes, they tend to work harder to ensure that the desired results are achieved than they would if management had implemented the changes. For these teams to function properly, team members must be trained in quality, process improvement, and teamwork. Self-directed teams have a number of benefits. One is that fewer managers are necessary; very often one manager can handle

Self-directed teams  Groups empowered to make certain changes in their work processes.

At the Michigan International Speedway pit stop, the Toyota team changes four tires, fills the gas tank, and does a maintenance check in under 15 seconds. This is done 4-6 times during a 400-mile NASCAR race.

ste24102_ch07_288-324.indd 292ste24102_ch07_288-324.indd 292 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

Chapter Seven Work Design and Measurement 293

several teams. Also, self-directed teams can provide improved responsiveness to problems, they have a personal stake in making the process work, and they require less time to imple- ment improvements.

Generally, the benefits of teams include higher quality, higher productivity, and greater worker satisfaction. Moreover, higher levels of employee satisfaction can lead to less turn- over and absenteeism, resulting in lower costs to train new workers and less need to fill in for absent employees. This does not mean that organizations will have no difficulties in applying the team concept. Managers, particularly middle managers, often feel threatened as teams assume more of the traditional functions of managers.

Moreover, among the leading problems of teams are conflicts between team members, which can have a detrimental impact on the effectiveness of a team.

Expert Robert Bacal has a list of requirements for successful team building: 1

1. Clearly stated and commonly held vision and goals.

2. Talent and skills required to meet goals.

3. Clear understanding of team members’ roles and functions.

4. Efficient and shared understanding of procedures and norms.

5. Effective and skilled interpersonal relations.

6. A system of reinforcement and celebration.

7. Clear understanding of the team’s relationship to the greater organization.

Ergonomics Ergonomics (or human factors) is the scientific discipline concerned with the understand- ing of interactions among humans and other elements of a system, and the profession that applies theory, principles, data and methods to design in order to optimize human well-being and overall system performance. “Ergonomists contribute to the design and evaluation of tasks, jobs, products, environments and systems in order to make them compatible with the needs, abilities and limitations of people.” 2 In the work environment, ergonomics also helps to increase productivity by reducing worker discomfort and fatigue.

The International Ergonomics Association organizes ergonomics into three domains: physical (e.g., repetitive movements, layout, health, and safety); cognitive (mental workload, decision making, human–computer interaction, and work stress); and organizational (e.g., communication, teamwork, work design, and telework). 3

Many examples of ergonomics applications can be found in operations management. In the early 1900s, Frederick Winslow Taylor, known as the father of scientific management, found that the amount of coal that workers could shovel could be increased substantially by reduc- ing the size and weight of the shovels. Frank and Lillian Gilbreth expanded Taylor’s work, developing a set of motion study principles intended to improve worker efficiency and reduce injury and fatigue. Over the years since then, technological changes have broadened the scope of ergonomics, as hand–eye coordination and decision making became more important in the workplace. More recently, the increasing level of human–computer interfacing has again broadened the scope of the field of ergonomics, not only in job design, but also in electronics product design.

Poor posture can lead to fatigue, low productivity, and injuries to the back, neck, and arm. Good posture can help avoid or minimize these problems. Figure 7.1 illustrates good posture when using a computer.

Ergonomics  Incorporation of human factors in the design of the workplace.

1 Robert Bacal, “The Six Deadly Sins of Team-Building,” www.performance-appraisals.org . 2 The International Ergonomics Association ( www.iea.cc ). 3 Ibid. 4Ibid.

ste24102_ch07_288-324.indd 293ste24102_ch07_288-324.indd 293 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

294 Chapter Seven Work Design and Measurement

7.3 QUALITY OF WORK LIFE People work for a variety of reasons. Generally people work to earn a living. Also they may be seeking self-realization, status, physical and mental stimulation, and socialization. Quality of work life affects not only workers’ overall sense of well-being and contentment, but also worker productivity. Quality of work life has several key aspects. Getting along well with coworkers and having good managers can contribute greatly to the quality of work life. Lead- ership style is particularly important. Also important are working conditions and compensa- tion, which are addressed here.

Working Conditions Working conditions are an important aspect of job design. Physical factors such as tempera- ture, humidity, ventilation, illumination, and noise can have a significant impact on worker performance in terms of productivity, quality of output, and accidents. In many instances, government regulations apply.

Temperature and Humidity. Although human beings can function under a fairly wide range of temperatures and humidity, work performance tends to be adversely affected if tem- peratures or humidities are outside a very narrow comfort band. That comfort band depends on how strenuous the work is; the more strenuous the work, the lower the comfort range.

Ventilation. Unpleasant and noxious odors can be distracting and dangerous to workers. Moreover, unless smoke and dust are periodically removed, the air can quickly become stale and annoying.

Illumination. The amount of illumination required depends largely on the type of work being performed; the more detailed the work, the higher the level of illumination needed for adequate performance. Other important considerations are the amount of glare and contrast.

LO7.5 Discuss the impact of working conditions on job design.

FIGURE 7.1 Components of a comfortable workstation

Source:  Copyright 2007 Bennett, Coleman & Co. Ltd. All rights reserved.

Viewing Distance

Arms & Wrist Angle

Mouse

Monitor Height

Monitor Angle

Document Holder

Seat back Angle

Seat Height

Keyboard Height

ste24102_ch07_288-324.indd 294ste24102_ch07_288-324.indd 294 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

Chapter Seven Work Design and Measurement 295

From a safety standpoint, good lighting in halls, stairways, and other dangerous points is important. However, because illumination is expensive, high illumination in all areas is not generally desirable.

Noise and Vibrations. Noise is unwanted sound. It is caused by both equipment and humans. Noise can be annoying or distracting, leading to errors and accidents. It also can damage or impair hearing if it is loud enough. Figure 7.2 illustrates loudness levels of some typical sounds.

Vibrations can be a factor in job design even without a noise component, so merely elimi- nating sound may not be sufficient in every case. Vibrations can come from tools, machines, vehicles, human activity, air-conditioning systems, pumps, and other sources. Corrective measures include padding, stabilizers, shock absorbers, cushioning, and rubber mountings.

Work Time and Work Breaks. Reasonable (and sometimes flexible) work hours can provide a sense of freedom and control over one’s work. This is useful in situations where the emphasis is on completing work on a timely basis and meeting performance objectives rather than being “on duty” for a given time interval, as is the case for most retail and manufacturing operations.

Work breaks are also important. Long work intervals tend to generate boredom and fatigue. Productivity and quality can both deteriorate. Similarly, periodic vacation breaks can give workers something to look forward to, a change of pace, and a chance to recharge themselves.

Occupational Health Care. Good worker health contributes to productivity, minimizes health care costs, and enhances workers’ sense of well-being. Many organizations have exer- cise and healthy-eating programs designed to improve or maintain employees’ fitness and general health.

Safety. Worker safety is one of the most basic issues in job design. This area needs constant attention from management, employees, and designers. Workers cannot be effectively moti- vated if they feel they are in physical danger.

From an employer standpoint, accidents are undesirable because they are expensive (insur- ance and compensation); they usually involve damage to equipment and/or products; they require hiring, training, and makeup work; and they generally interrupt work. From a worker standpoint, accidents mean physical suffering, mental anguish, potential loss of earnings, and disruption of the work routine.

The two basic causes of accidents are worker carelessness and accident hazards. Under the heading of carelessness come unsafe acts. Examples include failing to use protective equip- ment, overriding safety controls (e.g., taping control buttons down), disregarding safety pro- cedures, using tools and equipment improperly, and failing to use reasonable caution in danger zones. Unsafe conditions include unprotected pulleys, chains, material-handling equipment, machinery, and so on. Also, poorly lit walkways, stairs, and loading docks constitute haz- ards. Toxic wastes, gases and vapors, and radiation hazards must be contained. Protection against hazards involves use of proper lighting, clearly marked danger zones, use of protective equipment (hardhats, goggles, earmuffs, gloves, heavy shoes and clothing), safety devices

FIGURE 7.2 Decibel values of typical sounds(db)

Source:  From Benjamin W. Niebel, Motion and Time Study, 8th ed. Copyright © Richard D. Irwin, Inc. Used by permission of McGraw-Hill Companies, Inc., p. 248.

Threshold of hearing

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Very quiet

Quiet Intrusive Very annoying Painfully loud

Whisper

Common sounds

Bedroom

Air conditioning

unit Train

Large propeller aircraft

Jet aircraftGrinder

ste24102_ch07_288-324.indd 295ste24102_ch07_288-324.indd 295 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

296 Chapter Seven Work Design and Measurement

(machine guards, dual control switches that require an operator to use both hands), emergency equipment (emergency showers, fire extinguishers, fire escapes), and thorough instruction in safety procedures and use of regular and emergency equipment. Housekeeping (clean floors, open aisles, waste removal) is another important safety factor.

An effective program of safety and accident control requires the cooperation of both work- ers and management. Workers must be trained in proper procedures and attitudes, and they can contribute to a reduction in hazards by pointing out hazards to management. Management must enforce safety procedures and the use of safety equipment. If supervisors allow work- ers to ignore safety procedures or look the other way when they see violations, workers will be less likely to take proper precautions. Some firms use contests that compare departmental safety records. However, accidents cannot be completely eliminated, and a freak accident may seriously affect worker morale and might even contribute to additional accidents. Posters can be effective, particularly if they communicate in specific terms how to avoid accidents. For example, the admonition “Be careful” is not nearly as effective as “Wear hardhats,” “Walk, don’t run,” or “Hold on to rail.”

The enactment of the Occupational Safety and Health Act in 1970, and the creation of the Occupational Safety and Health Administration (OSHA), emphasized the importance of safety considerations in systems design. The law was intended to ensure that workers in all organizations have healthy and safe working conditions. It provides specific safety regulations with inspectors to see that they are adhered to. Inspections are carried out both at random and to investigate complaints of unsafe conditions. OSHA officials are empowered to issue warnings, to impose fines, and even to invoke court-ordered shutdowns for unsafe conditions.

OSHA must be regarded as a major influence on operations management decisions in all areas relating to worker safety. OSHA has promoted the welfare and safety of workers in its role as a catalyst, spurring companies to make changes that they knew were needed but “hadn’t gotten around to making.”

Ethical Issues. Ethical issues affect operations through work methods, working conditions and employee safety, accurate record keeping, unbiased performance appraisals, fair compen- sation, and opportunities for advancement.

Compensation Compensation is a significant issue for the design of work systems. It is important for orga- nizations to develop suitable compensation plans for their employees. If wages are too low, organizations may find it difficult to attract and hold competent workers and managers. If wages are too high, the increased costs may result in lower profits, or may force the orga- nization to increase its prices, which might adversely affect demand for the organization’s products or services.

Organizations use a variety of approaches to compensate employees, including time-based systems, output-based systems, and knowledge-based systems. Time-based systems, also known as hourly and measured daywork systems, compensate employees for the time the employee has worked during a pay period. Salaried workers also represent a form of time- based compensation. Output-based (incentive) systems compensate employees accord- ing to the amount of output they produce during a pay period, thereby tying pay directly to performance.

Time-based systems are more widely used than incentive systems, particularly for office, administrative, and managerial employees, but also for blue-collar workers. One reason for this is that computation of wages is straightforward and managers can readily estimate labor costs for a given employee level. Employees often prefer time-based systems because the pay is steady and they know how much compensation they will receive for each pay period. In addition, employees may resent the pressures of an output-based system.

Another reason for using time-based systems is that many jobs do not lend themselves to the use of incentives. In some cases, it may be difficult or impossible to measure output. For example, jobs that require creative or mental work cannot be easily measured on an output

OSHA  Occupational Safety andHealth Administration, created by the Occupational Safety and Health Act of 1970.

Time-based system  Com- pensation based on time an employee has worked during a pay period.

Output-based (incentive) system  Compensation based on amount of output an employee produced during a pay period.

ste24102_ch07_288-324.indd 296ste24102_ch07_288-324.indd 296 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

Chapter Seven Work Design and Measurement 297

basis. Other jobs may include irregular activities or have so many different forms of output that measuring output and determining pay are fairly complex. In the case of assembly lines, the use of individual incentives could disrupt the even flow of work; however, group incen- tives are sometimes used successfully in such cases. Finally, quality considerations may be as important as quantity considerations. In health care, for example, emphasis is generally placed on both the quality of patient care and the number of patients processed.

On the other hand, situations exist where incentives are desirable. Incentives reward work- ers for their output, presumably causing some workers to produce more than they might under a time-based system. The advantage is that certain (fixed) costs do not vary with increases in output, so the overall cost per unit decreases if output increases. Workers may prefer incen- tive systems because they see a relationship between their efforts and their pay: An incentive system presents an opportunity for them to earn more money.

On the negative side, incentive systems involve a considerable amount of paperwork, com- putation of wages is more difficult than under time-based systems, output has to be measured and standards set, cost-of-living increases are difficult to incorporate into incentive plans, and contingency arrangements for unavoidable delays have to be developed.

Table 7.2 lists the main advantages and disadvantages of time-based and output-based plans. In order to obtain maximum benefit from an incentive plan, the plan should be accurate,

easy to understand and apply, fair, and consistent. In addition, there should be an obvious relationship between effort and reward, and no limit on earnings.

Incentive systems may focus on the output of each individual or a group.

Individual Incentive Plans. Individual incentive plans take a variety of forms. The sim- plest plan is straight piecework. Under this plan, a worker’s pay is a direct linear function of his or her output. In the past, piecework plans were fairly popular. Now minimum wage legislation makes them somewhat impractical. Even so, many of the plans currently in use represent variations of the straight piecework plan. They typically incorporate a base rate that serves as a floor: Workers are guaranteed that amount as a minimum, regardless of output. The base rate is tied to an output standard; a worker who produces less than the standard will be paid at the base rate. This protects workers from pay loss due to delays, breakdowns, and similar problems. In most cases, incentives are paid for output above standard, and the pay is referred to as a bonus.

People work for a variety of reasons besides compensation. The work environment at Google makes it an appealing place to work. Google provides employees with a number of perks, including massage rooms, a music room, cafeteria, arcade games, and other benefits. The office in Dublin is the technology hub in Europe.

ste24102_ch07_288-324.indd 297ste24102_ch07_288-324.indd 297 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

298 Chapter Seven Work Design and Measurement

which is then divided among eligible employees. Division is typically prorated according to the base salary of each participant. Profit sharing is generally done on an annual basis. At some firms profit sharing may be directly contributed as pre- tax dollars into a retirement program, such as a 401K program.

Profit plans work best at more established firms with relatively steady earnings. The criteria for the profit plan must be carefully defined in advance.

Profit Plans Don’t Always Work The advantages of a profit-sharing plan include: It pulls people together since everyone is on the same plan; it gets people to focus on profit- ability; and its cost to the company goes up and down in sync with pre-tax earnings.

The disadvantages include: It echoes the base salary; it does not take into consideration performance during the year; it is focused on a single objective.

For smaller companies with erratic earnings, profit-sharing plans can frustrate and irritate employees by creating expectations that are not fulfilled each year. I switched away from a profit-based incentive plan because I found that a small payout level, following a year of weak profitability, made a low morale situation even worse.

“The right incentive plan properly implemented can drive your business ahead like a rocket ship. But if expectations increase faster than actual payouts—watch out for trouble!”

Incentive Plans Pull Companies Together! Years ago the only employees offered incentive pay were sales per- sonnel, piece workers, and top executives. Today most large corpora- tions, and many smaller firms, offer an incentive package to all of their employees.

Some kind of incentive pay is an important part of any compen- sation plan. Incentive pay shows appreciation and creates a sense of participation in the company’s well-being that straight salary dollars, no matter how large, don’t convey. A well-designed incentive-pay plan can also help pull people together, help point them in the direction you want them to go, and give that extra push that every company needs in today’s competitive environment.

Profit-Sharing Plans Are Common Profit-sharing plans are probably the most widespread incentive-pay programs at larger corporations. They are generally company-wide and made available at least to all full-time employees. Usually the company will contribute a small percentage of its pre-tax profitability to a pool,

READING Choosing Incentive Plans

lly done on an annual

s. se

(continued)

Management Worker

TIME-BASED Advantages 1. Stable labor costs 1. Stable pay

2. Easy to administer 3. Simple to compute pay

2. Less pressure to produce than under output system

4. Stable output Disadvantages 1. No incentive for workers to increase

output 1. Extra efforts not rewarded

OUTPUT-BASED Advantages 1. Lower cost per unit 1. Pay related to efforts

2. Greater output 2. Opportunity to earn more Disadvantages 1. Wage computation more difficult 1. Pay fluctuates

2. Need to measure output 3. Quality may suffer 4. Difficult to incorporate wage

increases 5. Increased problems with scheduling

2. Workers may be penalized because of factors beyond their control (e.g., machine breakdown)

TABLE 7.2 Comparison of time-based and output-based pay systems

LO7.6 Compare the advan- tages and disadvantages of time-based and output-based pay systems.

Group Incentive Plans. A variety of group incentive plans, which stress sharing of pro- ductivity gains with employees, are in use. Some focus exclusively on output, while others reward employees for output and for reductions in material and other costs.

One form of group incentive is the team approach, which many companies are now using for problem solving and continuous improvement. The emphasis is on team, not individual, performance.

ste24102_ch07_288-324.indd 298ste24102_ch07_288-324.indd 298 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

Chapter Seven Work Design and Measurement 299

Knowledge-Based Pay Systems. As companies shift toward lean production, a number of changes have had a direct impact on the work environment. One is that many of the buffers that previously existed are gone. Another is that fewer managers are present. Still another is increased emphasis on quality, productivity, and flexibility. Consequently, workers who can perform a variety of tasks are particularly valuable. Organizations are increasingly recogniz- ing this, and they are setting up pay systems to reward workers who undergo training that increases their skill levels. This is sometimes referred to as knowledge-based pay. It is a portion of a worker’s pay that is based on the knowledge and skill that the worker possesses. Knowledge-based pay has three dimensions: Horizontal skills reflect the variety of tasks the worker is capable of performing; vertical skills reflect managerial tasks the worker is capable of; and depth skills reflect quality and productivity results.

Management Compensation. Many organizations that traditionally rewarded managers and senior executives on the basis of output are now seriously reconsidering that approach. With the new emphasis on customer service and quality, reward systems are being restruc- tured to reflect new dimensions of performance. In addition, executive pay in many com- panies is being more closely tied to the success of the company or division that executive is responsible for. Even so, there have been news reports of companies increasing the compensa- tion of top executives even as workers were being laid off and the company was losing large amounts of money!

Recent Trends. Many organizations are moving toward compensation systems that empha- size flexibility and performance objectives, with variable pay based on performance. Some are using profit-sharing plans, or bonuses based on achieving profit or cost goals. And the increasing cost of employee health benefits is causing organizations to rethink their overall compensation packages. Some are placing more emphasis on quality of work life. An ideal compensation package is one that balances motivation, profitability, and retention of good employees.

7.4 METHODS ANALYSIS One of the techniques used by self-directed teams and work analysts is methods analysis, which focuses on how a job is done. Job design often begins with an analysis of the overall operation. It then moves from general to specific details of the job, concentrating on arrange- ment of the workplace and movements of materials and/or workers. Methods analysis can be a good source of productivity improvements.

The need for methods analysis can come from a number of different sources: Changes in tools and equipment, changes in product design or introduction of new prod-

ucts, changes in materials or procedures, government regulations or contractual agreements, and incidents such as accidents and quality problems.

Knowledge-based pay  A pay system used by organizations to reward workers who undergo training that increases their skills.

LO7.7 Explain the purpose of methods analysis and describe how methods studies are performed.

Methods analysis  Analyzing how a job is done.

significant one-time payout if an employee has an extraordinary accom- plishment that may not be repeated in future years.

The disadvantages include: The payout is subjective, and employees may feel that they deserve a higher pay-out; it can be divisive when, all too often, a top performer tells other people what a big bonus they got; employees may focus more on “looking good” than on working to increase corporate profits.

Source: Bob Adams, “Streetwise Business Tips,” www.businesstown.com .

Incentive Programs Award Achievers Last year we switched to an individual bonus incentive program, where the annual payout is determined by a subjective evaluation of each per- son’s performance.

The advantages are: Unlike a profit-sharing plan, we can dramati- cally differentiate the payout given to a star performer versus a weaker one; we can differentiate between an individual’s performance and the company’s performance; and there is complete flexibility for a

ste24102_ch07_288-324.indd 299ste24102_ch07_288-324.indd 299 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

300 Chapter Seven Work Design and Measurement

Methods analysis is done for both existing jobs and new jobs. For a new job it is needed to establish a method. For an existing job the procedure usually is to have the analyst observe the job as it is currently being performed and then devise improvements. For a new job, the analyst must rely on a job description and an ability to visualize the operation.

The basic procedure in methods analysis is as follows:

1. Identify the operation to be studied, and gather all pertinent facts about tools, equip- ment, materials, and so on.

2. For existing jobs, discuss the job with the operator and supervisor to get their input.

3. Study and document the present method of an existing job using process charts. For new jobs, develop charts based on information about the activities involved.

4. Analyze the job.

5. Propose new methods.

6. Install the new methods.

7. Follow up implementation to assure that improvements have been achieved.

Selecting an Operation to Study. Sometimes a foreman or supervisor will request that a certain operation be studied. At other times, methods analysis will be part of an overall pro- gram to increase productivity and reduce costs. Some general guidelines for selecting a job to study are to consider jobs that

1. Have a high labor content.

2. Are done frequently.

3. Are unsafe, tiring, unpleasant, and/or noisy.

4. Are designated as problems (e.g., quality problems, processing bottlenecks).

Documenting the Current Method. Use charts, graphs, and verbal descriptions of the way the job is now being performed. This will provide a good understanding of the job and serve as a basis of comparison against which revisions can be judged.

The most common ergonomic risk factors are awkward postures, excessive force for lifting, pushing, pulling, and gripping, and repetition involving the same group of muscles. On the left, the worker was using a pistol grip driver in a vertical application which was placing her into a poor shoulder posture. She was experiencing increasing pain in her right shoulder. On the right, by modifying the tools being used, the worker is now into a good shoulder posture.

ste24102_ch07_288-324.indd 300ste24102_ch07_288-324.indd 300 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

Chapter Seven Work Design and Measurement 301

Analyzing the Job and Proposing New Methods. Job analysis requires careful thought about the what, why, when, where, and who of the job. Often, simply going through these questions will clarify the review process by encouraging the analyst to take a devil’s advocate attitude toward both present and proposed methods.

Analyzing and improving methods is facilitated by the use of various charts such as flow process charts and worker-machine charts.

Flow process charts are used to review and critically examine the overall sequence of an operation by focusing on the movements of the operator or the flow of materials. These charts are helpful in identifying nonproductive parts of the process (e.g., delays, temporary stor- ages, distances traveled). Figure 7.3 describes the symbols used in constructing a flow process chart, and Figure 7.4 illustrates a flow process chart.

The uses for flow process charts include studying the flow of material through a depart- ment, studying the sequence that documents or forms take, analyzing movement and care of surgical patients, studying layout of department and grocery stores, and handling mail.

Flow process chart  Chart used to examine the overall sequence of an operation by focusing on movements of the operator or flow of materials.

FIGURE 7.3 Process chart symbols

Source:  Adapted from Benjamin W. Niebel, Motion and Time Study, 8th ed. Copyright © Richard D. Irwin, Inc. Used by permission of McGraw-Hill Companies, Inc., p. 35.

1 2 3 4 5

7 6

Operation

A large circle indi- cates an operation such as

Transportation

An arrow indicates a transportation, such as

Storage

A triangle indicates a storage, such as

Delay

A large capital D indicates a delay, such as

Inspection

A square indicates an inspection, such as

Drive nail

Move material by cart

Mix Computer/word processing

Move material by conveyor

Move material by carrying (messenger)

Raw material in bulk storage

Finished stock stacked on pallets

Protective filing of documents

Wait for elevator

Material in truck or on floor at bench waiting to be processed

Papers waiting to be filed

Read steam gauge on boiler

Examine printed form for information

Examine material for quality or quantity

Rules and Regulations 1. Obey all rules and respect supervisor. 2. Work hard at all times 3. No loafing on the job unless approved by your supervisor. 4. Follow all previous rules if possible.

HOT

WARM

COLD

DANGER

ste24102_ch07_288-324.indd 301ste24102_ch07_288-324.indd 301 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

302 Chapter Seven Work Design and Measurement

Experienced analysts usually develop a checklist of questions they ask themselves to gen- erate ideas for improvements. The following are some representative questions:

1. Why is there a delay or storage at this point?

2. How can travel distances be shortened or avoided?

3. Can materials handling be reduced?

4. Would a rearrangement of the workplace result in greater efficiency?

5. Can similar activities be grouped?

6. Would the use of additional or improved equipment be helpful?

7. Does the worker have any ideas for improvements?

A worker-machine chart is helpful in visualizing the portions of a work cycle during which an operator and equipment are busy or idle. The analyst can easily see when the operator and machine are working independently and when their work overlaps or is inter- dependent. One use of this type of chart is to determine how many machines or how much equipment the operator can manage. Figure 7.5 presents an example of a worker-machine chart, where the “worker” is actually a customer weighing a purchase in the bulk-foods section of a supermarket. Among other things, the chart highlights worker and machine utilization.

Installing the Improved Method. Successful implementation of proposed method changes requires convincing management of the desirability of the new method and obtaining the cooperation of workers. If workers have been consulted throughout the process and have made suggestions that are incorporated in the proposed changes, this part of the task will be considerably easier than if the analyst has assumed sole responsibility for the development of the proposal.

If the proposed method constitutes a major change from the way the job has been per- formed in the past, workers may have to undergo a certain amount of retraining, and full implementation may take some time to achieve.

The Follow-Up. In order to ensure that changes have been made and that the proposed method is functioning as expected, the analyst should review the operation after a reasonable period and consult again with the operator.

Worker-machine chart  Chart used to determine portions of a work cycle during which an operator and equipment are busy or idle.

FIGURE 7.4 Format of a flow process chart

Source:  Elias M. Awad, Systems Analysis and Design, 4th ed. Copyright © 1985 by Richard D. Irwin, Inc. Used by permission of McGraw-Hill Companies, Inc., p. 113.

Requisition made out by department head

Put in “pick-up” basket

To accounting department

Account and signature verified

Amount approved by treasurer

Amount counted by cashier

Amount recorded by bookkeeper

Petty cash sealed in envelope

Petty cash carried to department

Petty cash checked against requisition

Receipt signed

Petty cash stored in safety box

Details of method

Requisition of petty cash ANALYST

D. Kolb

PAGE

1 of 2

O pe

ra tio

n M

ov em

en t

In sp

ec tio

n D

el ay

S to

ra ge

FLOW PROCESS CHART

Job _______________________

ste24102_ch07_288-324.indd 302ste24102_ch07_288-324.indd 302 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

Chapter Seven Work Design and Measurement 303

7.5 MOTION STUDY Motion study is the systematic study of the human motions used to perform an operation. The purpose is to eliminate unnecessary motions and to identify the best sequence of motions for maximum efficiency. Hence, motion study can be an important avenue for productivity improvements. Present practice evolved from the work of Frank Gilbreth, who originated the concepts in the bricklaying trade in the early 20th century. Through the use of motion study techniques, Gilbreth is generally credited with increasing the average number of bricks laid per hour by a factor of 3, even though he was not a bricklayer by trade. When you stop to realize that bricklaying had been carried on for centuries, Gilbreth’s accomplishment is even more remarkable.

There are a number of different techniques that motion study analysts can use to develop efficient procedures. The most-used techniques are the following:

1. Motion study principles.

2. Analysis of therbligs.

3. Micromotion study.

4. Charts.

Gilbreth’s work laid the foundation for the development of motion study principles, which are guidelines for designing motion-efficient work procedures. The guidelines are divided into three categories: principles for use of the body, principles for arrangement of the workplace, and principles for the design of tools and equipment. Table  7.3 lists some examples of the principles.

In developing work methods that are motion efficient, the analyst tries to

1. Eliminate unnecessary motions.

2. Combine activities.

3. Reduce fatigue.

4. Improve the arrangement of the workplace.

5. Improve the design of tools and equipment.

LO7.8 Describe four com- monly used techniques for motion study.

Motion study  Systematic study of the human motions used to perform an operation.

Motion study principles   Guidelines for designing motion- efficient work procedures.

FIGURE 7.5 Worker-machine chart

1

2

3

4

5

Step

Product: Bulk Food Process: Weigh/price

Operator: Customer Charted by: R.G.

Customer Time (seconds)

Machine

Customer places on scale

Enters product code

Obtains price sticker and removes bag

Places price sticker on bag

0

1

2

3

4

5

6

7

Calculates and displays total price. Dispenses price sticker.

Summary

Customer

Time (seconds) %

Machine

Time (seconds) %

Work Idle

7 1

87.5 12.5

1 7

12.5 87.5

ste24102_ch07_288-324.indd 303ste24102_ch07_288-324.indd 303 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

304 Chapter Seven Work Design and Measurement

Therbligs are basic elemental motions. The term therblig is Gilbreth spelled back- ward (except for the th ). The approach is to break jobs down into basic elements and base improvements on an analysis of these basic elements by eliminating, combining, or rear- ranging them.

Although a complete description of therbligs is outside the scope of this text, a list of some common ones will illustrate the nature of these basic elemental motions:

Search implies hunting for an item with the hands and/or the eyes.

Select means to choose from a group of objects.

Grasp means to take hold of an object.

Hold refers to retention of an object after it has been grasped.

Transport load means movement of an object after hold.

Release load means to deposit the object.

Some other therbligs are inspect, position, plan, rest, and delay. Describing a job using therbligs often takes a substantial amount of work. However, for

short, repetitive jobs, therbligs analysis may be justified. Frank Gilbreth and his wife, Lillian, an industrial psychologist, were also responsible for

introducing motion pictures for studying motions, called micromotion study. This approach is applied not only in industry but also in many other areas of human endeavor, such as sports and health care. Use of the camera and slow-motion replay enables analysts to study motions that would otherwise be too rapid to see. In addition, the resulting films provide a permanent record that can be referred to, not only for training workers and analysts but also for settling job disputes involving work methods.

The cost of micromotion study limits its use to repetitive activities, where even minor improvements can yield substantial savings owing to the number of times an operation is repeated, or where other considerations justify its use (e.g., surgical procedures).

Motion study analysts often use charts as tools for analyzing and recording motion stud- ies. Activity charts and process charts such as those described earlier can be quite helpful. In addition, analysts may use a simo chart (see Figure 7.6 ) to study simultaneous motions of the hands. These charts are invaluable in studying operations such as data entry, sewing, surgical and dental procedures, and certain assembly operations.

Therbligs  Basic elemental motions that make up a job.

Micromotion study  Use of motion pictures and slow motion to study motions that otherwise would be too rapid to analyze.

A. The use of the human body. Examples:

1. Both hands should begin and end their basic divisions of accomplishment simultaneously and should not be idle at the same instant, except during rest periods.

2. The motions made by the hands should be made symmetrically.

3. Continuous curved motions are preferable to straight-line motions involving sudden and sharp changes in direction.

B. The arrangement and conditions of the workplace. Examples:

1. Fixed locations for all tools and material should be located to permit the best sequence and to eliminate or reduce the therbligs’ search and select.

2. Gravity bins and drop delivery should reduce reach and move times; wherever possible, ejectors should remove finished parts automatically.

C. The design of tools and equipment. Examples:

1. All levers, handles, wheels, and other control devices should be readily accessible to the operator and designed to give the best possible mechanical advantage and to utilize the strongest available muscle group.

2. Parts should be held in position by fixtures.

TABLE 7.3 Motion study principles

Source:  Adapted from Benjamin W. Niebel, Motion and Time Study, 8th ed. Copyright © Richard D. Irwin, Inc. Used by permission of McGraw-Hill Companies, Inc., pp. 206–207.

ste24102_ch07_288-324.indd 304ste24102_ch07_288-324.indd 304 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

Chapter Seven Work Design and Measurement 305

FIGURE 7.6 A simultaneous motion chart

Source: From Benjamin W. Niebel, Motion and Time Study, 8th ed. Copyright © 1988 Richard D. Irwin, Inc. Used by permission of McGraw-Hill Companies, Inc., p. 229.

OPERATOR: Ken Reisch DATE: May 21, OPERATION: Assembly PART: Lace Finger METHOD: Proposed CHART BY: Joseph Riley

SIMO CHART

TI M

E SC

AL E

(w in

ks )

4548

EL EM

EN T

TI M

E LEFT-HAND DESCRIPTION

12

SY M

BO L

RE

1 2 3 4 5 5 4 3 2 1

MOTION CLASS

SY M

BO L

TI M

E SC

AL E

(w in

ks )

EL EM

EN T

TI M

ERIGHT-HAND DESCRIPTION

SUMMARY

SYM.

RE

G

M

P

U

I

RL

TOTALS

% TIME LEFT-HAND SUMMARY

Reach

Grasp

Move

Position

Use

Idle

Release

%TIMERIGHT-HAND SUMMARY

Reach

Grasp

Move

Position

Use

Idle

Release

8.56

7.49

12.16

30.47

39.33

1.03

.96

100.0

249

218

354

887

1145

30

28

2911

245

221

413

1124

876

0

32

2911

8.4

7.6

14.2

38.6

30.1

0.0

1.1

100.0

4560

4579

4610

4685

4700

4715

7541

7559

19

31

75

15

15

12

18

Reach for finger

Grasp finger

Move finger

Position and release finger

Reach for clamp

Grasp clamp

Grasp assembly

Move and release assembly

G

M

P RL

RE

G

G

M RL

4548

4560

4579

4610

4685

4700

4715

7541

7559

12

19

31

75

15

15

12

18

RE

G

M

P RL

RE

G

G

M RL

Reach for finger

Grasp finger

Move finger

Position and release finger

Reach for clamp

Grasp clamp

Grasp assembly

Move and release assembly

7.6 WORK MEASUREMENT Job design determines the content of a job, and methods analysis determines how a job is to be performed. Work measurement is concerned with determining the length of time it should take to complete the job. Job times are vital inputs for capacity planning, workforce planning, estimating labor costs, scheduling, budgeting, and designing incentive systems. Moreover, from the workers’ standpoint, time standards reflect the amount of time it should take to do a given job working under typical conditions. The standards include expected activity time plus allowances for probable delays.

LO7.9 Define a standard time.

Work measurement  Deter- mining how long it should take to do a job.

ste24102_ch07_288-324.indd 305ste24102_ch07_288-324.indd 305 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

306 Chapter Seven Work Design and Measurement

A standard time is the amount of time it should take a qualified worker to complete a specified task, working at a sustainable rate, using given methods, tools and equipment, raw material inputs, and workplace arrangement. Whenever a time standard is developed for a job, it is essential to provide a complete description of the parameters of the job because the actual time to do the job is sensitive to all of these factors; changes in any one of the factors can materially affect time requirements. For instance, changes in product design or changes in job performance brought about by a methods study should trigger a new time study to update the standard time. As a practical matter, though, minor changes are occasionally made that do not justify the expense of restudying the job. Consequently, the standards for many jobs may be slightly inaccurate. Periodic time studies may be used to update the standards.

Organizations develop time standards in a number of different ways. Although some small manufacturers and service organizations rely on subjective estimates of job times, the most commonly used methods of work measurement are (1) stopwatch time study, (2) historical times, (3) predetermined data, and (4) work sampling. The following pages describe each of these techniques in some detail.

Stopwatch Time Study Stopwatch time study was first introduced over a hundred years ago by Frederick Win- slow Taylor to set times for manufacturing and construction activities. It was met with much resistance from workers, who felt they were being taken advantage of. Nonetheless, over time, this measurement tool gained acceptance, and it is now a common practice to conduct time studies on a wide range of activities in distribution and warehousing, janito- rial services, waste management, call centers, hospitals, data processing, retail operations, sales, and service and repair operations. It is especially appropriate for short, repetitive tasks.

Stopwatch time study is used to develop a time standard based on observations of one worker taken over a number of cycles. That is then applied to the work of all others in the organization who perform the same task. The basic steps in a time study are the following:

1. Define the task to be studied, and inform the worker who will be studied.

2. Determine the number of cycles to observe.

3. Time the job, and rate the worker’s performance.

4. Compute the standard time.

The analyst who studies the job should be thoroughly familiar with it since it is not unusual for workers to attempt to include extra motions during the study in hope of gaining a standard that allows more time per piece (i.e., the worker will be able to work at a slower pace and still meet the standard). Furthermore, the analyst will need to check that the job is being per- formed efficiently before setting the time standard.

In most instances, an analyst will break all but very short jobs down into basic ele- mental motions (e.g., reach, grasp) and obtain times for each element. There are several reasons for this: One is that some elements are not performed in every cycle, and the breakdown enables the analyst to get a better perspective on them. Another is that the worker’s proficiency may not be the same for all elements of the job. A third reason is to build a file of elemental times that can be used to set times for other jobs. This use will be described later.

Workers sometimes feel uneasy about being studied and fear changes that might result. The analyst should make an attempt to discuss these things with the worker prior to studying an operation to allay such fears and to enlist the cooperation of the worker.

The number of cycles that must be timed is a function of three things: (1) the variability of observed times, (2) the desired accuracy, and (3) the desired level of confidence for the estimated job time. Very often the desired accuracy is expressed as a percentage of the mean of the observed times. For example, the goal of a time study may be to achieve an estimate

Standard time  The time it should take a fully trained and qualified worker to complete a specific task, working at an efficient, yet sustainable pace, using specific methods, tools and equipment, raw materials, and workplace arrangement.

LO7.10 Describe and compare time study methods and perform calculations.

Stopwatch time study   Development of a time standard based on observations of one worker taken over a number of cycles.

ste24102_ch07_288-324.indd 306ste24102_ch07_288-324.indd 306 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

Chapter Seven Work Design and Measurement 307

that is within 10 percent of the actual mean. The sample size needed to achieve that goal can be determined using this formula:

2

n zs ax

= ⎛⎝ ⎞ ⎠

Use this formula when desired accuracy is a percent.

(7–1)

where

z   �  Number of normal standard deviations needed for desired confidence

s   �  Sample standard deviation

a   �  Desired accuracy percentage

x �   Sample mean

Typical values of z used in this computation are: 4

Of course, the value of z for any desired confidence can be obtained from the normal table in Appendix B, Table A.

An alternate formula used when the desired accuracy, e, is stated as an amount (e.g., within one minute of the true mean) instead of a percentage is

2

= ⎛⎝⎜ ⎞ ⎠⎟n

zs

e Use this formula when desired accuracy is a time. (7–2)

where

e   �  Maximum acceptable amount of time error

To make a preliminary estimate of sample size, it is typical to take a small number of observations (i.e., 10 to 20) and compute values of x and s to use in the formula for n. Toward the end of the study, the analyst may want to recompute n using revised estimates of x and s based on the increased data available.

Note: These formulas may or may not be used in practice, depending on the person doing the time study. Often, an experienced analyst will rely on his or her judgment in deciding on the number of cycles to time.

Desired

Confidence (%) z Value

90 1.65 95 1.96 95.5 2.00 98 2.33 99 2.58

4 Theoretically, a t rather than a z value should be used because the population standard deviation is unknown. However, the use of z is simpler and provides reasonable results when the number of observations is 30 or more, as it generally is. In practice, z is used almost exclusively.

E X A M P L E 1 A time study analyst wants to estimate the time required to perform a certain job. A prelimi- nary study yielded a mean of 6.4 minutes and a standard deviation of 2.1 minutes. The desired confidence is 95 percent. How many observations will he need (including those already taken) if the desired maximum error is

a. � 10 percent of the sample mean?

b. One-half minute?

e celx mhhe.com/stevenson12e

ste24102_ch07_288-324.indd 307ste24102_ch07_288-324.indd 307 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

308 Chapter Seven Work Design and Measurement

Development of a time standard involves computation of three times: the observed time (OT), the normal time (NT), and the standard time (ST).

Observed Time. The observed time is simply the average of the recorded times. Thus,

OT � �x

n i (7–3)

where

OT  �  Observed time

∑ x i   �  Sum of recorded times

n   �  Number of observations

Note: If a job element does not occur each cycle, its average time should be determined sepa- rately and that amount should be included in the observed time, OT.

Normal Time. The normal time is the observed time adjusted for worker performance. It is computed by multiplying the observed time by a performance rating. That is,

NT OT PR� � (7–4)

where

NT  �  Normal time

PR  �  Performance rating

This assumes that a single performance rating has been made for the entire job. If ratings are made on an element-by-element basis, the normal time is obtained by multiplying each ele- ment’s average time by its performance rating and summing those values:

NT ( PR )� � �x j j (7–5)

where

Average�x j time for element j

PR j   �  Performance rating for element j

The reason for including this adjustment factor is that the worker being observed may be working at a rate different from a “normal” rate, either to deliberately slow the pace or because his or her natural abilities differ from the norm. For this reason, the observer assigns a performance rating, to adjust the observed times to an “average” pace. A normal rating is

S O L U T I O N a. s   �  2.1 minutes z   �  5 1.96 x �  6.4 minutes a   �  10%

= ⎛⎝⎜ ⎞ ⎠⎟ =

⎛ ⎝⎜

⎞ ⎠⎟

= 1.96(2.1)

.10(6.4) 41.36

2 2

n zs

ax

; round up to 42 observations

b. e   �  .5 minute 1.96 2.1

.5 67.77

2 2( )= ⎛⎝⎜ ⎞ ⎠⎟ =

⎛ ⎝⎜

⎞ ⎠⎟

=n zs

e ; round up to 68 observations

Note: When the value of n is noninteger, round up.

ste24102_ch07_288-324.indd 308ste24102_ch07_288-324.indd 308 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

Chapter Seven Work Design and Measurement 309

1.00. A performance rating of .9 indicates a pace that is 90 percent of normal, whereas a rating of 1.05 indicates a pace that is slightly faster than normal. For long jobs, each element may be rated; for short jobs, a single rating may be made for an entire cycle. Machine segments of a job are typically given a rating of 1.00.

When assessing performance, the analyst must compare the observed performance to his or her concept of normal. Obviously, there is room for debate about what constitutes nor- mal performance, and performance ratings are sometimes the source of considerable conflict between labor and management. Although no one has been able to suggest a way around these subjective evaluations, sufficient training and periodic recalibration of analysts using training films can provide a high degree of consistency in the ratings of different analysts. To avoid any bias, a second analyst may be called in to also do performance ratings. In fact, union shops may require this.

Standard Time. The normal time does not take into account such factors as personal delays (worker fatigue, getting a drink of water or going to the restroom), unavoidable delays (machine adjustments and repairs, talking to a supervisor, waiting for materials), or breaks. The standard time for a job is the normal time multiplied by an allowance factor for these delays.

The standard time is

ST NT AF� � (7–6)

where

ST  �  Standard time

AF  �  Allowance factor

Allowances can be based on either job time or time worked (e.g., a workday). If allowances are based on the job time, the allowance factor is computed using the following formula:

AF 1 , where Allowance percentage based on job timejob � � �A A (7–7)

This is used when different jobs have different allowances. If allowances are based on a per- centage of the time worked (i.e., the workday ), the appropriate formula is

AF

1

1 , where Allowance percentage based on workdayday �

� �

A A

(7–8)

This is used when jobs are the same or similar and have the same allowance factors.

Compute the allowance factor for these two cases:

a. The allowance is 20 percent of job time.

b. The allowance is 20 percent of work time.

e celx mhhe.com/stevenson12e

E X A M P L E 2

S O L U T I O N A  �  .20 a. AF  �  1  �   A   �  1.20, or 120%

b. AF 1

1

1

1 .20 1.25,�

� �

� �

A or 125%

Table 7.4 illustrates some typical allowances. In practice, allowances may be based on the judgment of the time study analyst, work sampling (described later in the chapter), or negotia- tions between labor and management.

Example 3 illustrates the time study process from observed times to the standard time.

ste24102_ch07_288-324.indd 309ste24102_ch07_288-324.indd 309 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

310 Chapter Seven Work Design and Measurement

Percent Percent

A. Constant allowances: 4. Bad light: 1. Personal allowance .............................................. 5 a. Slightly below recommended ............................. 0 2. Basic fatigue allowances ...................................... 4 b. Well below ......................................................... 2 B. Variable allowances: c. Very inadequate ................................................. 5 1. Standing allowance .............................................. 2 5. Atmospheric conditions 2. Abnormal position allowance: (heat and humidity)—variable ................................ 0–10 a. Slightly awkward ............................................. 0 6. Close attention: b. Awkward (bending) .......................................... 2 a. Fairly fine work .................................................. 0 c. Very awkward (lying, stretching) ...................... 7 b. Fine or exacting ................................................. 2 3. Use of force or muscular energy c. Very fine or very exacting ................................... 5 (lifting, pulling, or pushing): 7. Noise level: Weight lifted (in pounds): a. Continuous ........................................................ 0 5 .................................................................... 0 b. Intermittent—loud ............................................. 2 10 .................................................................... 1 c. Intermittent—very loud ...................................... 5 15 .................................................................... 2 d. High-pitched—loud ........................................... 5 20 .................................................................... 3 8. Mental strain: 25 .................................................................... 4 a. Fairly complex process ...................................... 1 30 .................................................................... 5 b. Complex or wide span of attention ..................... 4 35 .................................................................... 7 c. Very complex ..................................................... 8 40 .................................................................... 9 9. Monotony: 45 .................................................................... 11 a. Low ................................................................... 0 50 .................................................................... 13 b. Medium ............................................................. 1 60 .................................................................... 17 c. High ................................................................... 4 70 .................................................................... 22 10. Tediousness: a. Rather tedious ................................................... 0 b. Tedious .............................................................. 2 c. Very tedious ....................................................... 5

Source: From Benjamin W. Niebel, Motion and Time Study, 8th ed. Copyright © by Richard D. Irwin, Inc. Used by permission of McGraw-Hill Companies, Inc., p. 416.

TABLE 7.4 Typical allowance percentages for working conditions

A time study of an assembly operation yielded the following observed times for one ele- ment of the job, for which the analyst gave a performance rating of 1.13. Using an allowance of 20 percent of job time, determine the appropriate standard time for this operation.

i Observation

Time, x (minutes)

i Observation

Time, x (minutes)

1 1.12 6 1.18 2 1.15 7 1.14 3 1.16 8 1.14 4 1.12 9 1.19 5 1.15 Total 10.35

n � 9 PR � 1.13 A � .20

e celx mhhe.com/stevenson12e

E X A M P L E 3

S O L U T I O N 1. OT

10.35

9 1.15 minutes.�

� � �

xi

n

2. NT  �  OT  �  PR  �  1.15(1.13)  �  1.30 minutes.

3. ST  �  NT  �  (1  �   A )  �  1.30(1.20)  �  1.56 minutes.

ste24102_ch07_288-324.indd 310ste24102_ch07_288-324.indd 310 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

Chapter Seven Work Design and Measurement 311

Note: If an abnormally short time has been recorded, it typically would be assumed to be the result of observational error and thus discarded. If one of the observations in Example 3 had been .10, it would have been discarded. However, if an abnormally long time has been recorded, the analyst would want to investigate that observation to determine whether some irregularly occurring aspect of the task (e.g., retrieving a dropped tool or part) exists, which should legitimately be factored into the job time.

Despite the obvious benefits that can be derived from work measurement using time study, some limitations also must be mentioned. One limitation is the fact that only those jobs that can be observed can be studied. This precludes most managerial and creative jobs, because these involve mental as well as physical aspects. Also, the cost of the study rules out its use for irregular operations and infrequently occurring jobs. Finally, it disrupts the normal work routine, and workers resent it in many cases.

Standard Elemental Times Standard elemental times are derived from a firm’s own historical time study data. Over the years, a time study department can accumulate a file of elemental times that are common to many jobs. After a while, many elemental times can be simply retrieved from the file, elimi- nating the need for analysts to go through a complete time study to obtain them.

The procedure for using standard elemental times consists of the following steps:

1. Analyze the job to identify the standard elements.

2. Check the file for elements that have historical times, and record them. Use time study to obtain others, if necessary.

3. Modify the file times if necessary (explained below).

4. Sum the elemental times to obtain the normal time, and factor in allowances to obtain the standard time.

In some cases, the file times may not pertain exactly to a specific task. For instance, stan- dard elemental times might be on file for “move the tool 3 centimeters” and “move the tool 9 centimeters,” when the task in question involves a move of 6 centimeters. However, it is often possible to interpolate between values on file to obtain the desired time estimate.

One obvious advantage of this approach is the potential savings in cost and effort created by not having to conduct a complete time study for each job. A second advantage is that there is less disruption of work, again because the analyst does not have to time the worker. A third advantage is that performance ratings do not have to be done; they are generally averaged in the file times. The main disadvantage of this approach is that times may not exist for enough standard elements to make it worthwhile, and the file times may be biased or inaccurate.

The method described in the following section is a variation of this approach, which helps avoid some of these problems.

Predetermined Time Standards Predetermined time standards involve the use of published data on standard elemental times. A commonly used system is methods-time measurement (MTM), which was devel- oped by the Methods Engineering Council. The MTM tables are based on extensive research of basic elemental motions and times. To use this approach, the analyst must divide the job into its basic elements (reach, move, turn, disengage), measure the distances involved (if applicable), rate the difficulty of the element, and then refer to the appropriate table of data to obtain the time for that element. The standard time for the job is obtained by adding the times for all of the basic elements. One minute of work may cover quite a few basic elements; a typical job may involve several hundred or more of these basic elements. The analyst needs a considerable amount of skill to adequately describe the operation and develop realistic time estimates. Analysts generally take training or certification courses to develop the necessary skills to do this kind of work.

Standard elemental times  Time standards derived from a firm’s historical time data.

Predetermined time standards  Published data based on extensive research to deter- mine standard elemental times.

ste24102_ch07_288-324.indd 311ste24102_ch07_288-324.indd 311 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

312 Chapter Seven Work Design and Measurement

Among the advantages of predetermined time standards are the following:

1. They are based on large numbers of workers under controlled conditions.

2. The analyst is not required to rate performance in developing the standard.

3. There is no disruption of the operation.

4. Standards can be established even before a job is done.

Although proponents of predetermined standards claim that the approach provides much better accuracy than stopwatch studies, not everyone agrees with that claim. Some argue that many activity times are too specific to a given operation to be generalized from published data. Others argue that different analysts perceive elemental activity breakdowns in different ways, and that this adversely affects the development of times and produces varying time esti- mates among analysts. Still others claim that analysts differ on the degree of difficulty they assign a given task and thereby obtain different time standards.

Work Sampling Work sampling is a technique for estimating the proportion of time that a worker or machine spends on various activities and the idle time.

Unlike time study, work sampling does not require timing an activity, nor does it even involve continuous observation of the activity. Instead, an observer makes brief observations of a worker or machine at random intervals and simply notes the nature of the activity. For example, a machine may be busy or idle; a secretary may be typing, filing, talking on the telephone, and so on; and a carpenter may be carrying supplies, taking measurements, cutting wood, and so on. The resulting data are counts of the number of times each category of activ- ity or nonactivity was observed.

Although work sampling is occasionally used to set time standards, its two primary uses are in (1) ratio-delay studies, which concern the percentage of a worker’s time that involves unavoidable delays or the proportion of time a machine is idle, and (2) analysis of nonrepeti- tive jobs. In a ratio-delay study, a hospital administrator, for example, might want to estimate the percentage of time that a certain piece of X-ray equipment is not in use. In a nonrepetitive job, such as secretarial work or maintenance, it can be important to establish the percentage of time an employee spends doing various tasks.

Nonrepetitive jobs typically involve a broader range of skills than repetitive jobs, and workers in these jobs are often paid on the basis of the highest skill involved. There- fore, it is important to determine the proportion of time spent on the high-skill level. For example, a secretary may do word processing, file, answer the telephone, and do other routine office work. If the secretary spends a high percentage of time filing instead of doing word processing, the compensation will be lower than for a secretary who spends a high percentage of time doing word processing. Work sampling can be used to verify those percentages and can therefore be an important tool in developing the job description. In addition, work sampling can be part of a program for validation of job content that is needed for “bona fide occupational qualifications”—that is, advertised jobs requiring the skills that are specified.

Work sampling estimates include some degree of error. Hence, it is important to treat work sampling estimates as approximations of the actual proportion of time devoted to a given activity. The goal of work sampling is to obtain an estimate that provides a specified con- fidence of not differing from the true value by more than a specified error. For example, a hospital administrator might request an estimate of X-ray idle time that will provide a 95 percent confidence of being within 4 percent of the actual percentage. Hence, work sampling is designed to produce a value, ̂p , which estimates the true proportion, p, within some allow- able error, : ˆ .�e p e The variability associated with sample estimates of p tends to be approxi- mately normal for large sample sizes. The amount of maximum probable error is a function of both the sample size and the desired level of confidence.

Work sampling  Technique for estimating the proportion of time that a worker or machine spends on various activities and the idle time.

LO7.11 Describe work sam- pling and perform calculations.

ste24102_ch07_288-324.indd 312ste24102_ch07_288-324.indd 312 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

Chapter Seven Work Design and Measurement 313

For large samples, the maximum error percent e can be computed using the following formula:

ˆ(1 ˆ)

� �

e z p p

n (7–9)

where

z   �  Number of standard deviations needed to achieve desired confidence

̂p �  Sample proportion (the number of occurrences divided by the sample size)

n   �  Sample size

In most instances, management will specify the desired confidence level and amount of allow- able error, and the analyst will be required to determine a sample size sufficient to obtain these results. The appropriate value for n can be determined by solving Formula 7–9 for n, which yields

ˆ(1 ˆ) 2

�n z

e p p= ⎛⎝⎜

⎞ ⎠⎟

(7–10)

E X A M P L E 4 e celx

mhhe.com/stevenson12e

The manager of a small supermarket chain wants to estimate the proportion of time stock clerks spend making price changes on previously marked merchandise. The manager wants a 98 percent confidence that the resulting estimate will be within 5 percent of the true value. What sample size should she use?

= =.05 2.33 (see p. 307) ˆ is unknowne z p

S O L U T I O N When no sample estimate of p is available, a preliminary estimate of sample size can be obtained using ̂ .50.�p After 20 or so observations, a new estimate of ̂p can be obtained from those observations and a revised value of n computed using the new ̂ .p It would be prudent to recompute the value of n at two or three points during the study to obtain a better indication of the necessary sample size. Thus, the initial estimate of n is

2.33

.05 .50 1 .50 542.89,or 543

2

n ( )= ⎛⎝⎜ ⎞ ⎠⎟ − =

observations

Suppose that, in the first 20 observations, stock clerks were found to be changing prices twice, making ̂ 2 / 20 .10.� �p The revised estimate of n at that point would be

2.33

.05 .10 1 .10 195.44, or 196

2

n ( )= ⎛⎝⎜ ⎞ ⎠⎟ − = observations

Suppose a second check is made after a total of 100 observations, and ̂ .11�p at this point (including the initial 20 observations). Recomputing n yields

2.33

.05 .11 .89 212.60, or 213

2

n ( )= ⎛⎝⎜ ⎞ ⎠⎟ = observations

Note: As before, if the resulting value of n is noninteger, round up. Perhaps the manager might make one more check to settle on a final value for n. If the

computed value of n is less than the number of observations already taken, sampling would be terminated at that point.

Determining the sample size is only one part of work sampling. The overall procedure consists of the following steps:

1. Clearly identify the worker(s) or machine(s) to be studied.

2. Notify the workers and supervisors of the purpose of the study to avoid arousing suspicions.

ste24102_ch07_288-324.indd 313ste24102_ch07_288-324.indd 313 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

314 Chapter Seven Work Design and Measurement

3. Compute an initial estimate of sample size using a preliminary estimate of p, if available (e.g., from analyst experience or past data). Otherwise, use ̂ .50.�p

4. Develop a random observation schedule.

5. Begin taking observations. Recompute the required sample size several times during the study.

6. Determine the estimated proportion of time spent on the specified activity.

Careful problem definition can prevent mistakes such as observing the wrong worker or wrong activity. It is also important to obtain random observations to get valid results.

Observations must be spread out over a period of time so that a true indication of variabil- ity is obtained. If observations are bunched too closely in time, the behaviors observed during that time may not genuinely reflect typical performance.

Determination of a random observation schedule involves the use of a random number table (see Table 7.5 ), which consists of unordered sequences of numbers (i.e., random). Use of these tables enables the analyst to incorporate randomness into the observation schedule. Numbers obtained from the table can be used to identify observation times for a study. Any size number (i.e., any number of digits read as one number) can be obtained from the table. The digits are in groups of four for convenience only. The basic idea is to obtain numbers from the table and to convert each one so that it corresponds to an observation time. There are a number of ways to accomplish this. In the approach used here, we will obtain three sets of numbers from the table for each observation: the first set will correspond to the day, the second to the hour, and the third to the minute when the observation is to be made. The number of digits necessary for any set will relate to the number of days in the study, the number of hours per day, and minutes per hour. For instance, if the study covers 47 days, a two-digit number will be needed; if the activity is per- formed for eight hours per day, a one-digit number will be needed for hours. Of course, since each hour has 60 minutes, a two-digit number will be needed for minutes. Thus, we need a two-digit number for the day, a one-digit number for the hour, and a two-digit number for minutes. A study requiring observations over a seven-day period in an office that works nine hours per day needs one-digit numbers for days, one-digit numbers for hours, and two-digit numbers for minutes.

Suppose that three observations will be made in the last case (i.e., seven days, nine hours, 60 minutes). We might begin by determining the days on which observations will be made, then the hours, and finally the minutes. Let’s begin with the first row in the random number table and read across: The first number is 6, which indicates day 6. The second number is 9. Since it exceeds the number of days in the study, it is simply ignored. The third number is 1, indicating day 1, and the next is 2, indicating day 2. Hence, observations will be made on days 6, 1, and 2. Next we determine the hours. Suppose we read the second row of column 1, again obtaining one-digit numbers. We find

Random number table   Table consisting of unordered sequences of numbers, used to determine random observation schedules.

1 2 3 4 5 6

1 6912 7264 2801 8901 4627 8387 2 3491 1192 0575 7547 2093 4617 3 4715 2486 2776 2664 3856 0064 4 1632 1546 1950 1844 1123 1908 5 8510 7209 0938 2376 0120 4237 6 3950 1328 7343 6083 2108 2044 7 7871 7752 0521 8511 3956 3957 8 2716 1396 7354 0249 7728 8818 9 2935 8259 9912 3761 4028 9207

10 8533 9957 9585 1039 2159 2438 11 0508 1640 2768 4666 9530 3352 12 2951 0131 4359 3095 4421 3018

TABLE 7.5 Portion of a random number table

ste24102_ch07_288-324.indd 314ste24102_ch07_288-324.indd 314 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

Chapter Seven Work Design and Measurement 315

3 ( 3rd hour),4 ( 4th hour),9 ( 9th hour)� � �

Moving to the next row and reading two-digit numbers, we find

47 ( 47th minute),15 ( 15th minute),24 ( 24th minute)� � �

Combining these results yields the following:

This means that on day 6 of the study an observation is to be made during the 47th minute of the 3rd hour; on day 1, during the 15th minute of the 4th hour; and on day 2, during the 24th minute of the 9th hour. For simplicity, these times can be put in chronological order by day. Thus,

A complete schedule of observations might appear as follows, after all numbers have been arranged in chronological order, assuming 10 observations per day for two days:

The general procedure for using a random number table is to read the numbers in some sequence (across rows, down or up columns), discarding any that lack correspondence. It is important to vary the starting point from one study to the next to avoid taking observations at the same times, because workers will quickly learn the times that observations are made, and the random feature will be lost. One way to choose a starting point is to use the serial number on a dollar bill to select a starting point.

In sum, the procedure for identifying random times at which to make work sampling observations involves the following steps:

1. Determine the number of days in the study and the number of hours per day. This will indicate the required number of digits for days and hours.

2. Obtain the necessary number of sets for days, ignoring any sets that exceed the number of days.

3. Repeat step 2 for hours.

Day Hour Minute

6 3 47 1 4 15 2 9 24

Day Hour Minute

1 4 15 2 9 24 6 3 47

DAY 1

Observation Time  Busy(√)  Idle (√)

1 8:15 2 9:24 3 9:02 4 9:31 5 9:48 6 10:05 7 10:20 8 11:02 9 1:13

10 3:55

DAY 2

Observation Time  Busy (√)  Idle (√)

1 8:04 2 9:15 3 9:24 4 9:35 5 10:12 6 10:27 7 10:38 8 10:58 9 11:50

10 1:14

ste24102_ch07_288-324.indd 315ste24102_ch07_288-324.indd 315 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

316 Chapter Seven Work Design and Measurement

4. Repeat step 2 for minutes.

5. Link the days, hours, and minutes in the order they were obtained.

6. Place the observation times in chronological order.

Table 7.6 presents a comparison of work sampling and time study. It suggests that a work sampling approach to determining job times is less formal and less detailed, and best suited to nonrepetitive jobs.

TABLE 7.6 Work sampling compared with stopwatch time study

LO7.12 Compare stopwatch time study and work sampling.

Advantages

1. Observations are spread out over a period of time, making results less susceptible to short-term fluctuations.

2. There is little or no disruption of work.

3. Workers are less resentful.

4. Studies are less costly and less time-consuming, and the skill requirements of the analyst are much less.

5. Studies can be interrupted without affecting the results.

6. Many different studies can be conducted simultaneously.

7. No timing device is required.

8. It is well suited for nonrepetitive tasks.

Disadvantages

1. There is much less detail on the elements of a job.

2. Workers may alter their work patterns when they spot the observer, thereby invalidating the results.

3. In many cases, there is no record of the method used by the worker.

4. Observers may fail to adhere to a random schedule of observations.

5. It is not well suited for short, repetitive tasks.

6. Much time may be required to move from one workplace to another and back to satisfy the randomness requirement.

7.7 OPERATIONS STRATEGY It is important for management to make design of work systems a key element of its opera- tions strategy. Despite the major advances in computers and operations technology, people are still the heart of a business; they can make or break it, regardless of the technology used. Technology is important, of course, but technology alone is not enough.

The topics described in this chapter all have an impact on productivity. Although they lack the glamour of high tech, they are essential to the fundamentals of work design.

Workers can be a valuable source of insight and creativity because they actually perform the jobs and are closest to the problems that arise. All too often, managers overlook contribu- tions and potential contributions of employees, sometimes from ignorance and sometimes from a false sense of pride. Union–management differences are also a factor. More and more, though, companies are attempting to develop a spirit of cooperation between employees and managers.

In the same vein, an increasing number of companies are focusing attention on improving the quality of work life and instilling pride and respect among workers. Many organizations are reaping surprising gains through worker empowerment, giving workers more say over their jobs.

ste24102_ch07_288-324.indd 316ste24102_ch07_288-324.indd 316 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

Chapter Seven Work Design and Measurement 317

The design of work systems involves quality of work life considerations as well as job design, methods analysis, and work measurement.

Quality of work life includes relationships with managers and co-workers, working conditions, and compensation. Job design is concerned with job content and work methods. In the past, job design tended to emphasize efficiency. More recently, emphasis has expanded to include behavioral consid- erations and worker satisfaction. Current concerns about productivity have thrust job design into the limelight. However, the jobs usually associated with high productivity are often the same jobs that are the greatest source of worker dissatisfaction, creating somewhat of a paradox for job designers.

Analysts often use methods analysis and motion study techniques to develop the “efficiency” aspects of jobs, but these do not directly address behavioral aspects. Nonetheless, they are an important part of job design. Working conditions are also a notable aspect of job design, not only because of the behav- ioral and efficiency factors but also because of concern for the health and safety of workers.

Work measurement is concerned with specifying the length of time needed to complete a job. Such information is vital for personnel planning, cost estimating, budgeting, scheduling, and worker compen- sation. Commonly used approaches include stopwatch time study and predetermined times. A related technique is work sampling, which can also be used to obtain data on activity times. More commonly, work sampling is used to estimate the proportion of time a worker spends on a certain aspect of the job. Table 7.7 provides a summary of the formulas used in time studies and work sampling.

Organizations can choose from a variety of compensation plans. It is important to do so carefully, for compensation is key to both the worker and the organization, and, once adopted, it is usually difficult to substantially change a compensation plan.

SUMMARY

TABLE 7.7 Summary of formulas

Time Study Work Sampling

A. Sample size A. Maximum error

n

zs ax

= ⎛⎝⎜ ⎞ ⎠⎟

2

(7–1)

e z

p p n

ˆ (1 ˆ ) �

(7–9)

[Use for % accuracy.] B. Sample size

n

z e

p p= ⎛⎝⎜ ⎞ ⎠⎟

ˆ (1 ˆ ) 2

n zs e

= ⎛⎝⎜ ⎞ ⎠⎟

2

(7–2) (7–10)

Symbols: a � Allowable error as percentage of average time A � Allowance percentage AF � Allowance factor e � Maximum acceptable amount of time error n � Number of observations needed NT � Normal time OT � Observed, or average, time ̂p � Sample proportion PR � Performance rating s � Standard deviation of observed times ST � Standard time x � Sample mean x i � Time for i th observation ( i   �  1, 2, 3, . . .,  n ) z � Number of standard deviations needed to

achieve desired confidence

[Use for time accuracy.] B. Observed time

x n

iOT � �

(7–3)

C. Normal time NT  �  OT  �  PR (7–4)

j jNT ( x PR )� � � (7–5)

D. Standard time ST  �  NT  �  AF (7–6) E. Allowance factor AF job   �  1  �   A (7–7)

A AF

1

1 day �

� (7–8)

1. Work design focuses on the core of operations.

2. Job design determines job content; methods analysis and motion study determine how a job is to be performed; and work measurement determines the time it should take to do a job.

3. The information provided by job design, methods analysis, motion study, and time standards is extremely valuable for process and productivity improvement.

4. Quality of work life can be a major factor in maintaining a productive workforce.

KEY POINTS

ste24102_ch07_288-324.indd 317ste24102_ch07_288-324.indd 317 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

318 Chapter Seven Work Design and Measurement

ergonomics, 293 flow process chart, 301 job design, 289 job enlargement, 291 job enrichment, 291 job rotation, 291 knowledge-based pay, 299 methods analysis, 299 micromotion study, 304

motion study, 303 motion study principles, 303 OSHA, 296 output-based (incentive) system, 296 predetermined time standards, 311 random number table, 314 self-directed teams, 292

specialization, 290 standard elemental times, 311 standard time, 306 stopwatch time study, 306 therbligs, 304 time-based system, 296 work measurement, 305 work sampling, 312 worker-machine chart, 302

KEY TERMS

SOLVED PROBLEMS

A time study analyst timed an assembly operation for 30 cycles, and then computed the average time per cycle, which was 18.75 minutes. The analyst assigned a performance rating of .96, and decided that an appropriate allowance was 15 percent. Assume the allowance factor is based on the workday. Determine the following: the observed time (OT), the normal time (NT), and the standard time (ST).

OT Average time 18.75 minutes

NT OT Performance rating 18.75 minutes .96 18 minutes

AF 1

1

1

1 .15 1.176

ST NT AF 18 1.176 21.17 minutes

� �

� � � � �

� �

� �

� � � � � A

A time study analyst wants to estimate the number of observations that will be needed to achieve a specified maximum error, with a confidence of 95.5 percent. A preliminary study yielded a mean of 5.2 minutes and a standard deviation of 1.1 minutes. Determine the total number of observations needed for these two cases:

a. A maximum error of �  6 percent of the sample mean.

b. A maximum error of .40 minute.

a. x � 5.2 minutes z � 2.00 for 95.5, from p. 307 s � 1.1 minutes a � .06

2.00 1.1

.06 5.2 49.72; round to 50 observations

2 2( ) ( )

= ⎛⎝⎜ ⎞ ⎠⎟ =

⎛ ⎝⎜

⎞ ⎠⎟

=n zs

ax

b. e � .40

2.00 1.1

.40 30.25; round to 31 observations

2 2( )= ⎛⎝⎜ ⎞ ⎠⎟ =

⎛ ⎝⎜

⎞ ⎠⎟

=n zs

e

Work sampling. An analyst has been asked to prepare an estimate of the proportion of time that a tur- ret lathe operator spends adjusting the machine, with a 90 percent confidence level. Based on previ- ous experience, the analyst believes the proportion will be approximately 30 percent.

a. If the analyst uses a sample size of 400 observations, what is the maximum possible error that will be associated with the estimate?

b. What sample size would the analyst need in order to have the maximum error be no more than �  5 percent?

Solution

Problem 3

Problem 1

Problem 2

Solution

ste24102_ch07_288-324.indd 318ste24102_ch07_288-324.indd 318 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

Chapter Seven Work Design and Measurement 319

ˆ .30 1.65 for 90 percent confidence from p. 307p z� �

a. ˆ(1 ˆ)

1.65 .3(.7)

400 .038�

� � �e z

p p

n

b. ˆ(1 ˆ) 1.65

.05 .3 .7 228.69, or 229

2 2

( )( )= ⎛⎝⎜ ⎞ ⎠⎟ =

⎛ ⎝⎜

⎞ ⎠⎟ =�n

z

e p p

Compute the standard deviation of this data: 3 2 4 1

Step 1: Find the mean of the data.

Step 2: Subtract the mean from each data point. These differences should sum to 0.

Step 3: Square each difference and sum the squares.

Step 4: Divide the sum of the squared differences by n   �  1.

Step 5: Compute the square root.

Solution

Problem 4

Solution

Data

Step 1 Compute Mean

Step 2 Compute Differences

Step 3 Square Differences

Step 4 Divide Sum by n � 1

Step 5 Compute Square root

3 3 3 � 2.5 � 0.5 0.52 �0.25

2 2 2 � 2.5 � �0.5 �0.52 �0.25

4 4 4 � 2.5 � 1.5 1.52 �2.25

1 1 1 � 2.5 � �1.5 �1.52 �2.25

10/4 � 2.5 0.0 5.00 5/(4 � 1) � 1.66667 �1.66667 1.291

SOLVED PROBLEMS

1. What is job design, and why is it important?

2. What are some of the main advantages and disadvantages of specialization from a management perspective? From a worker’s perspective?

3. a. Contrast the meanings of the terms job enlargement and job enrichment.

b. What is the purpose of approaches such as job enlargement and job enrichment?

4. a. What is ergonomics and why is it important in job design?

b. Explain how it can relate to quality of work life.

5. Explain the term knowledge-based pay system.

6. What are self-directed work teams? What are some potential benefits of using these teams?

7. Some Japanese firms have a policy of rotating their managers among different managerial jobs. In contrast, American managers are more likely to specialize in a certain area (e.g., finance or operations). Discuss the advantages and disadvantages of each of these approaches. Which do you prefer? Why?

8. What are motion study principles? How are they classified?

9. Name some reasons why methods analyses are needed. How is methods analysis linked to pro- ductivity improvements?

10. How are devices such as flow process charts and worker-machine charts useful?

11. What is a time standard? What factors must be taken into account when developing standards?

12. What are the main uses of time study information?

13. Could performance rating be avoided by studying a group of workers and averaging their times? Explain briefly.

DISCUSSION AND REVIEW QUESTIONS

ste24102_ch07_288-324.indd 319ste24102_ch07_288-324.indd 319 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

320 Chapter Seven Work Design and Measurement

14. If an average worker could be identified, what advantage would there be in using that person for a time study? What are some reasons why an average worker might not be studied?

15. What are the main limitations of time study?

16. Comment on the following: “At any given instant, the standard times for many jobs will not be strictly correct.” a. Why is this so? b. Does this mean that those standards are useless? Explain.

17. Why do workers sometimes resent time studies?

18. What are the key advantages and disadvantages of: a. Time-based pay plans? b. Incentive plans?

19. What is work sampling? How does it differ from time study?

1. What are the trade-offs in the following? a. Using self-directed teams instead of a more conventional approach with occasional use

of teams. b. Deciding how often to update standard times due to minor changes in work methods. c. Choosing between time study and work sampling for work measurement.

2. Who uses the results of work measurement in an organization, and how do they use them?

3. In what ways does technology have an impact on job design?

TAKING STOCK

1. Healthy Hots, a fast-food restaurant that offers heart-healthy food, is experiencing several difficul- ties with operations. Although customers like the idea of heart-healthy foods, and surveys indicate that customers find the food to be tasty and appealing, business has fallen off in recent weeks. At this point, the restaurant is not making a profit. Customers have complained about slow service, and employee turnover is high.

Explain briefly how techniques described in this chapter could be used to improve operations. Be specific about which techniques could be used, how they could be used, and why you think those techniques would be helpful.

2. Identify an unethical behavior for each of the five major topics in this chapter, and indicate which ethical principle (see Chapter 1) each violates.

CRITICAL THINKING EXERCISES

1. An analyst has timed a metal-cutting operation for 50 cycles. The average time per cycle was 10.40 minutes, and the standard deviation was 1.20 minutes for a worker with a performance rat- ing of 125 percent. Assume an allowance of 16 percent of job time. Find the standard time for this operation.

2. A job was timed for 60 cycles and had an average of 1.2 minutes per piece. The performance rating was 95 percent, and workday allowances are 10 percent. Determine each of the following: a. Observed time. b. Normal time. c. Standard time.

3. A time study was conducted on a job that contains four elements. The observed times and perfor- mance ratings for six cycles are shown in the following table.

PROBLEMS

OBSERVATIONS (minutes per cycle)

Element Performance

Rating 1 2 3 4 5 6

1 90% 0.44 0.50 0.43 0.45 0.48 0.46

2 85 1.50 1.54 1.47 1.51 1.49 1.52

3 110 0.84 0.89 0.77 0.83 0.85 0.80

4 100 1.10 1.14 1.08 1.20 1.16 1.26

ste24102_ch07_288-324.indd 320ste24102_ch07_288-324.indd 320 11/28/13 11:48 PM11/28/13 11:48 PM

Final PDF to printer

Chapter Seven Work Design and Measurement 321

a. Determine the average cycle time for each element. b. Find the normal time for each element. c. Assuming an allowance factor of 15 percent of job time, compute the standard time for this job.

4. Given these observed times (in minutes) for four elements of a job, determine the observed time (OT) for each element. Note: The second element only occurs every other cycle.

5. Given these observed times (in minutes) for five elements of a job, determine the observed time (OT) for each element. Note: Some of the elements occur only periodically.

6. Using Table 7.4 (on p. 310), develop an allowance percentage for a job element that requires the worker to lift a weight of 10 pounds while (1) standing in a slightly awkward position, (2) in light that is slightly below recommended standards, and (3) with intermittent loud noises occurring. The monotony for this element is high. Include a personal allowance of 5 percent and a basic fatigue allowance of 4 percent of job time.

7. A worker-machine operation was found to involve 3.3 minutes of machine time per cycle in the course of 40 cycles of stopwatch study. The worker’s time averaged 1.9 minutes per cycle, and the worker was given a rating of 120 percent (machine rating is 100 percent). Midway through the study, the worker took a 10-minute rest break. Assuming an allowance factor of 12 percent of work time, determine the standard time for this job.

8. A recently negotiated union contract allows workers in a shipping department 24 minutes for rest, 10 minutes for personal time, and 14 minutes for delays for each four hours worked. A time study analyst observed a job that is performed continuously and found an average time of 6.0 minutes per cycle for a worker she rated at 95 percent. What standard time is applicable for that operation?

9. The following data were obtained by observing a three-step job of a financial manager’s assistant. a. Using the data and an allowance of 10 percent of job time, determine a standard time for the

operation. b. Determine the number of observations that would be required to estimate the mean time for the

first element within 4 percent of the true value with a confidence of 98 percent. c. How many observations would be needed to estimate the mean time for element C to within

0.10 minutes of its actual value with a confidence of 90 percent?

CYCLE

Element 1 2 3 4 5 6

1 4.1 4.0 4.2 4.1 4.1 4.1

2 — 1.5 — 1.6 — 1.4

3 3.2 3.2 3.3 3.2 3.3 3.3

4 2.7 2.8 2.7 2.8 2.8 2.8

CYCLE

Element 1 2 3 4 5 6

1 2.1 2.0 2.2 2.1 2.1 —

2 — 1.1 — 1.0 — 1.2

3 3.4 3.5 3.3 3.5 3.4 3.3

4 4.0 — — 4.2 — —

5 1.4 1.4 1.5 1.5 1.5 1.4

OBSERVATIONS (minutes per cycle)

Element Performance

Rating 1 2 3 4 5

A 90% 1.40 1.42 1.39 1.38 1.41

B 120 2.10 2.05 2.00 1.85 1.80

C 110 1.60 1.40 1.50 1.45 1.55

ste24102_ch07_288-324.indd 321ste24102_ch07_288-324.indd 321 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

322 Chapter Seven Work Design and Measurement

10. The data in the table below represent time study observations for a woodworking operation. a. Based on the observations, determine the standard time for the operation, assuming an allow-

ance of 15 percent of job time. b. How many observations would be needed to estimate the mean time for element 2 within

1  percent of its true value with a 95.5 percent confidence? c. How many observations would be needed to estimate the mean time for element 2 within

.01 minute of its true value with a 95.5 percent confidence?

11. How many observations should a time study analyst plan for in an operation that has a standard deviation of 1.5 minutes per piece if the goal is to estimate the mean time per piece to within .4 minute with a confidence of 95.5 percent?

12. How many work cycles should be timed to estimate the average cycle time to within 2 percent of the sample mean with a confidence of 99 percent if a pilot study yielded these times (minutes): 5.2, 5.5, 5.8, 5.3, 5.5, and 5.1? The standard deviation is .253 minutes per cycle.

13. In an initial survey designed to estimate the percentage of time air-express cargo loaders are idle, an analyst found that loaders were idle in 6 of the 50 observations.

a. What is the estimated percentage of idle time? b. Based on the initial results, approximately how many observations would you require to esti-

mate the actual percentage of idle time to within 5 percent with a confidence of 95 percent?

14. An analyst made the following observations about whether customer service representatives were busy (B) or idle (I):

a. What is the percentage of idle time? b. Given these results, how many observations would be needed to estimate the actual percentage

of idle time to within 6 percent with a confidence of 90 percent?

15. A job in an insurance office involves telephone conversations with policyholders. The office man- ager estimates that about half of the employee’s time is spent on the telephone. How many observa- tions are needed in a work sampling study to estimate that time percentage to within 6 percent and have a confidence of 98 percent?

16. A hospital administrator thinks that the X-ray equipment is only in use about 20 percent of the time. What number of observations in a work sampling study would be needed to estimate the true per- centage of time to within 5 percent with a confidence of 98 percent?

17. Design a schedule of work sampling observations in which eight observations are made during one eight-hour day (use 0:00 to 7:59). Using Table 7.5, read the last digit going down column 4 for hours (e.g., 1 7 4 4 6 . . .), and read across row 3 from left to right in sets of two for minutes (e.g., 47 15 24 86 . . .). Arrange the times chronologically.

18. The manager of a large office intends to conduct a work sampling of the time the staff spends on the telephone. The observations will be taken over a period of 50 workdays. The office is open five days a week for eight hours a day (use 0:00 to 7:59). Although the study will consist of 200 random observations, in this problem you will be asked to determine times for 11 observations. Use random numbers from Table 7.5.

OBSERVATIONS (minutes per cycle)

Element Performance

Rating 1 2 3 4 5 6

1 110% 1.20 1.17 1.16 1.22 1.24 1.15

2 115 0.83 0.87 0.78 0.82 0.85 1.32 *

3 105 0.58 0.53 0.52 0.59 0.60 0.54

*Unusual delay, disregard time.

Observation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Busy or idle B B I B I B B B I B B B B I B B B B B I

ste24102_ch07_288-324.indd 322ste24102_ch07_288-324.indd 322 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

CASE

Chapter Seven Work Design and Measurement 323

a. Determine times for 11 observations. For days, read sets of two-digit numbers going across row 4 from left to right (e.g., 16 32 15 46 . . .), and do the same in row 5.

b. For hours, read one-digit numbers going down, using the first digit of column 1 (e.g., 6 4 3 1 . . .).

c. For minutes, read two-digit numbers going up column 4 using the first two digits (e.g., 30 46 10 . . .), and then repeat for the second two digits going up column 4 (e.g., 95 66 39 . . .).

d. Arrange the combinations chronologically by day, hour, and minute. e. Assume March 1 is a Monday and that there are no holidays in March, April, or May.

Convert your observation days to dates in March, April, and May.

19. A work sampling study is to be conducted on rush-hour traffic (4:00 p.m. to 6:59) five days per week. The study will encompass 40 days. Determine the day, hour, and minute for 10 observations using the following procedure and Table 7.5:

a. Read two-digit numbers going down the first two digits of column 5 (e.g., 46 20 38 . . .), and then down the second two digits of that column (e.g., 27 93 56 . . .) for days.

b. For hours, read one-digit numbers going from left to right across row 1 and then across row 2. (Read only 4s, 5s, and 6s.)

c. For minutes, read two-digit numbers going down column 6, first using the last two digits (e.g., 87 17 64 . . .), and, after exhausting those numbers, repeat using the first two digits of that col- umn (e.g., 83 46 00 19 . . .).

Arrange your times chronologically by day, then hour, and then minute.

Edgar F. Huse A group of 10 workers were responsible for assembling hotplates (instruments for heating solutions to a given temperature) for hospital and medical laboratory use. A number of different models of hotplates were being manufactured. Some had a vibrating device so that the solu- tion could be mixed while being heated. Others heated only test tubes. Still others could heat solutions in a variety of different containers.

With the appropriate small tools, each worker assembled part of a hotplate. The partially completed hotplate was placed on a moving belt, to be carried from one assembly station to the next. When the hotplate was completed, an inspector would check it over to ensure that it was working properly. Then the last worker would place it in a specially pre- pared cardboard box for shipping.

The assembly line had been carefully balanced by industrial engi- neers, who had used a time and motion study to break the job down into subassembly tasks, each requiring about three minutes to accomplish. The amount of time calculated for each subassembly had also been “balanced” so that the task performed by each worker was supposed to take almost exactly the same amount of time. The workers were paid a straight hourly rate.

However, there were some problems. Morale seemed to be low, and the inspector was finding a relatively high percentage of badly assem- bled hotplates. Controllable rejects—those “caused” by the operator rather than by faulty materials—were running about 23 percent.

After discussing the situation, management decided to try some- thing new. The workers were called together and asked if they would like to build the hotplates individually. The workers decided they would like to try this approach, provided they could go back to the old program

if the new one did not work well. After several days of training, each worker began to assemble the entire hotplate.

The change was made at about the middle of the year. Productivity climbed quickly. By the end of the year, it had leveled off at about 84 percent higher than during the first half of the year, although no other changes had been made in the department or its personnel. Control- lable rejects had dropped from 23 percent to 1 percent during the same period. Absenteeism had dropped from 8 percent to less than 1 percent. The workers had responded positively to the change, and their morale was higher. As one person put it, “Now, it is my hotplate.” Eventually, the reject rate dropped so low that all routine final inspection was done by the assembly workers themselves. The full-time inspector was trans- ferred to another job in the organization.

Questions

1. What changes in the work situation might account for the increase in productivity and the decrease in controllable rejects?

2. What might account for the drop in absenteeism and the increase in morale?

3. What were the major changes in the situation? Which changes were under the control of the manager? Which were controlled by workers?

4. What might happen if the workers went back to the old assembly line method?

Source: From Edgar Huse, The Modern Manager, 1E. © South-Western, a part of Cengage Learning, Inc. Reproduced by permission. www.Cengage.com/ permissions .

Making Hotplates

ste24102_ch07_288-324.indd 323ste24102_ch07_288-324.indd 323 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

324 Chapter Seven Work Design and Measurement

Aft, Larry. “New Tools for the Tried and True.” Indus- trial Engineer (March 2013), pp. 44–49.

Bridger, R. S. Introduction to Ergonomics. 3rd ed. New York: CRC Press, 2008.

Cascio, Wayne. Managing Human Resources: Produc- tivity, Quality of Work Life. Profits. 7th ed. New York: McGraw-Hill, 2006.

Freivalds, Andris, and Benjamin Neibel. Neibel’s Meth- ods, Standards, and Work Design. 13th ed. New York: McGraw-Hill, 2013.

Groover, Mikell P. Work Systems: The Methods, Mea- surement, and Management of Work. Upper Saddle River, NJ: Prentice Hall, 2007.

Meyers, Fred E. and J. R. Stewart. Motion and Time Study for Lean Manufacturing. 3rd ed. Upper Sad- dle River, NJ: Prentice Hall, 2002.

Mundel, Marvin E., and David L. Danner. Motion and Time Study: Improving Productivity. 7th ed. Engle- wood Cliffs, NJ: Prentice Hall, 1994.

Salvendy, Gavriel. Handbook of Human Factors and Ergonomics. 4th ed. New York: Wiley, 2012.

SELECTED BIBLIOGRAPHY AND FURTHER READINGS

ste24102_ch07_288-324.indd 324ste24102_ch07_288-324.indd 324 11/1/13 1:03 PM11/1/13 1:03 PM

Final PDF to printer

325

Learning is usually occurring when humans are involved; this is a basic consideration in the design of work systems. It is important to be able to predict how learning will affect task times and costs. This supplement addresses those issues.

7S.1 THE CONCEPT OF LEARNING CURVES Human performance of activities typically shows improvement when the activities are done on a repetitive basis: The time required to perform a task decreases with increasing repetitions. Learning curves summarize this phenomenon. The degree of improvement and the number of tasks needed to realize the major portion of the improvement is a function of the task being done. If the task is short and somewhat routine, only a modest amount of improvement is likely to occur, and it generally occurs during the first few repetitions. If the task is fairly complex and has a longer duration, improvements will occur over a longer interval (i.e., a larger number of repetitions). Therefore, learning factors have little relevance for planning or scheduling routine activities, but they do have relevance for new or complex repetitive activities.

Figure 7S.1 illustrates the basic relationship between increasing repetitions and a decreas- ing time per repetition. It should be noted that the curve will never touch the horizontal axis; that is, the time per unit will never be zero.

LO7S.1 Explain the concept of a learning curve.

SUPPLEMENT TO

C H A P T E R 7 SUPPLEMENT OUTLINE

7S.1 The Concept of Learning Curves, 325

7S.2 Applications of Learning Curves, 329

7S.3 Operations Strategy, 331

7S.4 Cautions and Criticisms, 331

Case: Product Recall, 335

Learning Curves LEARNING OBJECTIVES After completing this supplement, you should be able to:

LO7S.1 Explain the concept of a learning curve.

LO7S.2 Make time estimates based on learning curves.

LO7S.3 List and briefly describe some of the main applications of learning curves.

LO7S.4 Outline some of the cautions and criticisms of learning curves.

LO7S.5 Estimate learning rates from data on job times.

ste24102_ch07s_325-335.indd 325ste24102_ch07s_325-335.indd 325 11/1/13 12:27 PM11/1/13 12:27 PM

Final PDF to printer

326 Supplement to Chapter Seven Learning Curves

The general relationship is alternatively referred to as an experience curve, a progress function, or an improvement function. Experts agree that the learning effect is the result of other factors in addition to actual worker learning. Some of the improvement can be traced to preproduction factors, such as selection of tooling and equipment, product design, methods analysis, and, in general, the amount of effort expended prior to the start of the work. Other contributing factors may involve changes after production has begun, such as changes in methods, tooling, and design. In addition, management input can be an important factor through improvements in planning, scheduling, motivation, and control.

Changes that are made once production is under way can cause a temporary increase in time per unit until workers adjust to the change, even though they eventually lead to an increased output rate. If a number of changes are made during production, the learning curve would be more realistically described by a series of scallops instead of a smooth curve, as illustrated in Figure 7S.2 . Nonetheless, it is convenient to work with a smooth curve, which can be interpreted as the average effect.

From an organizational standpoint, what makes the learning effect more than an inter- esting curiosity is its predictability, which becomes readily apparent if the relationship

is plotted on a log-log scale (see Figure 7S.3 ). The straight line that results reflects a constant learning percentage, which is the basis of learning curve estimates: Empirical evidence shows that every doubling of repetitions results in a constant percentage decrease in the time per repetition. This applies both to the average and to the unit time. Typical decreases range from 10 percent to 20 percent. By convention, learning curves are referred to in terms of the complements of their improvement rates. For example, an 80 percent learning curve denotes a 20 percent decrease in unit (or average) time with each doubling of repetitions, and a 90 percent curve denotes a 10 percent improvement rate. Note that a 100 percent curve would imply no improvement at all.

Example 7S–1 illustrates an important point and also raises an interesting question. The point is that the time reduction per unit becomes less and less as the number of repetitions increases. For example, the second unit required two hours less time than the first, and the improvement from the 8th to the 16th unit was only slightly more than one hour. The question raised is: How are times computed for values such as three, five, six, seven, and other units that don’t fall into this pattern?

FIGURE 7S.1 The learning effect: Time per repetition decreases as the number of repetitions increases

Number of repetitions

T im

e p

er r

ep et

it io

n

0

FIGURE 7S.2 Improvements may create a scallop effect in the curve

Time

T im

e p

er u

n it

0

Improvements

Average

FIGURE 7S.3 On a log-log graph, learning curves are straight lines

Number of repetitions

T im

e p

er r

ep et

it io

n

1

100 80 60 50 40

30

20

10 8

6 5 4

3

2

1 2 3 4 5 6 8 10 20 30 40 10060

90%

80%

80

ste24102_ch07s_325-335.indd 326ste24102_ch07s_325-335.indd 326 11/1/13 12:27 PM11/1/13 12:27 PM

Final PDF to printer

Supplement to Chapter Seven Learning Curves 327

There are two ways to obtain the times. One is to use a formula; the other is to use a table of values.

First consider the formula approach. The formula is based on the existence of a linear relationship between the time per unit and the number of units when these two variables are expressed in logarithms.

The unit time (i.e., the number of direct labor hours required) for the n th unit can be com- puted using the following formula:

1� �T T nn b (7S–1)

where

T n   �  Time for n th unit

T 1   �  Time for first unit

b     �  ln (Learning percentage) �   ln 2; ln stands for the natural logarithm

To use the formula, you need to know the time for the first unit and the learning percent- age. For example, for an 80 percent curve with T 1   �  10 hours, the time for the third unit would be computed as

10(3 ) 7.023 ln .8 / ln 2� �T

Note: log can be used instead of ln. The second approach is to use a “learning factor” obtained from a table such as Table 7S.1 . The table shows two things for some selected learning percentages. One is a unit value for

the number of repetitions (unit number). This enables us to easily determine how long any unit will take to produce. The other is a cumulative value, which enables us to compute the total number of hours needed to complete any given number of repetitions. The computation for both is a relatively simple operation: Multiply the table value by the time required for the first unit.

To find the time for an individual unit (e.g., the 10th unit), use the formula

Unit time factor1� �T Tn (7S–2)

Thus, for an 85 percent curve, with T 1   �   4 hours, the time for the 10th unit would be 4  �  .583  �  2.33 hours. To find the time for all units up to a specified unit (e.g., the first 10 units), use the following formula:

Total time factor1� � �T Tn (7S–3)

Thus, for an 85 percent curve, with T 1 � 4 hours, the total time for all 10 units (including the time for unit 1) would be 4 � 7.116 � 28.464 hours.

Use of Table 7S.1 requires a time for the first unit. If for some reason the completion time of the first unit is not available, or if the manager believes the completion time for some later unit is more reliable, the table can be used to obtain an estimate of the initial time.

An activity is known to have an 80 percent learning curve. It has taken a worker 10 hours to produce the first unit. Determine expected completion times for these units: the 2nd, 4th, 8th, and 16th (note successive doubling of units). e celx

mhhe.com/stevenson12e

EXAMPLE 7S–1

S O L U T I O N Each time the cumulative output doubles, the time per unit for that amount should be approxi- mately equal to the previous time multiplied by the learning percentage (80 percent in this case). Thus:

Unit Unit Time (hours)

1 �  10

2 .8(10)  � 8

4 .8(8)  � 6.4

8 .8(6.4)  � 5.12

16 .8(5.12)  � 4.096

LO7S.2 Make time estimates based on learning curves.

ste24102_ch07s_325-335.indd 327ste24102_ch07s_325-335.indd 327 11/28/13 11:54 PM11/28/13 11:54 PM

Final PDF to printer

328 Supplement to Chapter Seven Learning Curves

TABLE 7S.1 Learning curve coefficients

70% 75% 80% 85% 90%

Unit Number

Unit Time

Total Time

Unit Time

Total Time

Unit Time

Total Time

Unit Time

Total Time

Unit Time

Total Time

1 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 2 .700 1.700 .750 1.750 .800 1.800 .850 1.850 .900 1.900 3 .568 2.268 .634 2.384 .702 2.502 .773 2.623 .846 2.746 4 .490 2.758 .562 2.946 .640 3.142 .723 3.345 .810 3.556 5 .437 3.195 .513 3.459 .596 3.738 .686 4.031 .783 4.339 6 .398 3.593 .475 3.934 .561 4.299 .657 4.688 .762 5.101 7 .367 3.960 .446 4.380 .534 4.834 .634 5.322 .744 5.845 8 .343 4.303 .422 4.802 .512 5.346 .614 5.936 .729 6.574 9 .323 4.626 .402 5.204 .493 5.839 .597 6.533 .716 7.290

10 .306 4.932 .385 5.589 .477 6.315 .583 7.116 .705 7.994 11 .291 5.223 .370 5.958 .462 6.777 .570 7.686 .695 8.689 12 .278 5.501 .357 6.315 .449 7.227 .558 8.244 .685 9.374 13 .267 5.769 .345 6.660 .438 7.665 .548 8.792 .677 10.052 14 .257 6.026 .334 6.994 .428 8.092 .539 9.331 .670 10.721 15 .248 6.274 .325 7.319 .418 8.511 .530 9.861 .663 11.384 16 .240 6.514 .316 7.635 .410 8.920 .522 10.383 .656 12.040 17 .233 6.747 .309 7.944 .402 9.322 .515 10.898 .650 12.690 18 .226 6.973 .301 8.245 .394 9.716 .508 11.405 .644 13.334 19 .220 7.192 .295 8.540 .388 10.104 .501 11.907 .639 13.974 20 .214 7.407 .288 8.828 .381 10.485 .495 12.402 .634 14.608 21 .209 7.615 .283 9.111 .375 10.860 .490 12.892 .630 15.237 22 .204 7.819 .277 9.388 .370 11.230 .484 13.376 .625 15.862 23 .199 8.018 .272 9.660 .364 11.594 .479 13.856 .621 16.483 24 .195 8.213 .267 9.928 .359 11.954 .475 14.331 .617 17.100 25 .191 8.404 .263 10.191 .355 12.309 .470 14.801 .613 17.713 26 .187 8.591 .259 10.449 .350 12.659 .466 15.267 .609 18.323 27 .183 8.774 .255 10.704 .346 13.005 .462 15.728 .606 18.929 28 .180 8.954 .251 10.955 .342 13.347 .458 16.186 .603 19.531 29 .177 9.131 .247 11.202 .338 13.685 .454 16.640 .599 20.131 30 .174 9.305 .244 11.446 .335 14.020 .450 17.091 .596 20.727

S O L U T I O N Using Table 7S.1 with n   �  20 and an 80 percent learning percentage, you find these factors: Unit time  �  5.381; Total time  �  10.485.

a. Expected time for 20th jet: 400(.381)  �  152.4 labor days.

b. Expected total time for all 20: 400(10.485)  �  4,194 labor days.

c. Average time for 20: 4,194  �  20  �  209.7 labor days.

Production Airplanes is negotiating a contract for the production of 20 small jet aircraft. The initial jet required the equivalent of 400 days of direct labor. The learning percentage is 80 percent. Estimate the expected number of days of direct labor for

a. The 20th jet.

b. All 20 jets.

c. The average time for 20 jets.

e celx mhhe.com/stevenson12e

EXAMPLE 7S–2

LO7S.2 Make time estimates based on learning curves.

ste24102_ch07s_325-335.indd 328ste24102_ch07s_325-335.indd 328 11/1/13 12:27 PM11/1/13 12:27 PM

Final PDF to printer

Supplement to Chapter Seven Learning Curves 329

7S.2 APPLICATIONS OF LEARNING CURVES Learning curve theory has found useful applications in a number of areas, including

1. Manpower planning and scheduling.

2. Negotiated purchasing.

3. Pricing new products.

4. Budgeting, purchasing, and inventory planning.

5. Capacity planning.

Knowledge of output projections in learning situations can help managers make better decisions about how many workers they will need than they could determine from decisions based on initial output rates. Of course, managers obviously recognize that improvement will occur; what the learning curve contributes is a method for quantifying expected future improvements.

Negotiated purchasing often involves contracting for specialized items that may have a high degree of complexity. Examples include aircraft, computers, and special-purpose equipment. The direct labor cost per unit of such items can be expected to decrease as the size of the order increases. Hence, negotiators first settle on the number of units and then negotiate price on that basis. The government requires learning curve data on contracts that involve large, complex items. For contracts that are terminated before delivery of all units, suppliers can use learning curve data to argue for an increase in the unit price for the smaller number of units. Conversely, the government can use that information to negotiate a lower price per unit on follow-on orders on the basis of projected additional learning gains.

Managers must establish prices for their new products and services, often on the basis of production of a few units. Generalizing from the cost of the first few units would result in a much higher price than can be expected after a greater number of units have been produced. Actually, the manager needs to use the learning curve to avoid underpricing as well as overpricing. The manager may project initial costs by using the learning progres- sion known to represent an organization’s past experience, or else do a regression analysis of the initial results.

The learning curve projections help managers to plan costs and labor, purchasing, and inventory needs. For example, initial cost per unit will be high and output will be fairly low, so purchasing and inventory decisions can reflect this. As productivity increases, purchasing and/or inventory actions must allow for increased usage of raw materials and purchased parts to keep pace with output. Because of learning effects, the usage rate will increase over time. Hence, failure to refer to a learning curve would lead to substantial overestimates of labor needs and underestimates of the rate of material usage.

The learning principles can sometimes be used to evaluate new workers during training periods. This is accomplished by measuring each worker’s performance, graphing the results, and comparing them to an expected rate of learning. The comparison reveals which workers are underqualified, qualified, and overqualified for a given type of work (see Figure 7S.4 ).

LO7S.3 List and briefly describe some of the main applications of learning curves.

The manager in Example 7S–2 believes that some unusual problems were encountered in producing the first jet and would like to revise that estimate based on a completion time of 276 days for the third jet.

e celx mhhe.com/stevenson12e

EXAMPLE 7S–3

S O L U T I O N The unit value for n   �  3 and an 80 percent curve is .702 ( Table 7S.1 ). Divide the actual time for unit 3 by the table value to obtain the revised estimate for unit 1’s time: 276 days  �  .702  �  393.2 labor days. LO7S.2 Make time

estimates based on learning curves.

ste24102_ch07s_325-335.indd 329ste24102_ch07s_325-335.indd 329 11/1/13 12:27 PM11/1/13 12:27 PM

Final PDF to printer

330 Supplement to Chapter Seven Learning Curves

FIGURE 7S.4 Worker learning curves can help guide personnel job placement

Training time

T im

e pe

r cy

cl e

0 One week

A (underqualified)

B (qualified)

C (overqualified)

Standard time

Use learning curve theory to predict the number of repetitions (units) that will be needed for a trainee to achieve a unit time of 6 minutes if the trainee took 10 minutes to do the first unit and a learning curve of 90 percent is operative.

a. Use the learning table.

b. Use the log formula.

e celx mhhe.com/stevenson12e

EXAMPLE 7S–4

S O L U T I O N a. The table approach can be used for the learning percentages that are listed across the top of the table, such as the 90 percent curve in this example. The table approach is based on Formula 7S–2:

Unit table factor1� �T Tn

Setting T n equal to the specified time of 6 minutes and solving for the unit table factor yields

� �6 min 10 min Unit table factor

Solving,

� � �Unit table factor 6 min 10 min .600

From Table 7S.1 , under 90% in the Unit Time column, we find .599 at 29 units. Hence, approximately 29 units will be required to achieve the specified time.

b. Using the log formula,

(1) Compute the ratio of specified time to first unit time: 6 min  �  10 min  �  .600.

(2) Compute the ratio of ln learning percentage to ln 2: ln .90  �   ln  2  �   �0.1053605  �  0.6931472  �  �0.1520.

(3) Find n such that .600: .600 28.809..1520 .1520� �� �n Round to 29. Hence, 29 units (repetitions) will be needed to achieve a time of 6 minutes.

The learning percentage can be estimated from data on repetition times. The procedure for doing this is illustrated in Solved Problem 2.

Moreover, measuring a worker’s progress can help predict whether the worker will make a quota within a required period of time.

Boeing uses learning curves to estimate weight reduction in new aircraft designs. Weight is a major factor in winning contracts because it is directly related to fuel economy.

ste24102_ch07s_325-335.indd 330ste24102_ch07s_325-335.indd 330 11/1/13 12:27 PM11/1/13 12:27 PM

Final PDF to printer

Supplement to Chapter Seven Learning Curves 331

7S.4 CAUTIONS AND CRITICISMS Managers using learning curves should be aware of their limitations and pitfalls. This section briefly outlines some of the major cautions and criticisms of learning curves.

1. Learning rates may differ from organization to organization and by type of work. Therefore, it is best to base learning rates on empirical studies rather than assumed rates where possible.

2. Projections based on learning curves should be regarded as approximations of actual times and treated accordingly.

3. Because time estimates are based on the time for the first unit, considerable care should be taken to ensure that the time is valid. It may be desirable to revise the base time as later times become available. Since it is often necessary to estimate the time for the first unit prior to production, this caution is very important.

4. It is possible that at some point the curve might level off or even tip upward, especially near the end of a job. The potential for savings at that point is so slight that most jobs do not command the attention or interest to sustain improvements. Then, too, some of the better workers or other resources may be shifted into new jobs that are starting up.

5. Some of the improvements may be more apparent than real: Improvements in times may be due in part to increases in indirect labor costs such as supervision, maintenance, and material handling personnel.

6. In mass production situations, learning curves may be of initial use in predicting how long it will take before the process stabilizes. For the most part, however, the concept does not apply to mass production because the decrease in time per unit is imperceptible for all practical purposes (see Figure 7S.5 ).

FIGURE 7S.5 Learning curves are useful for production startup, but not usually for mass production

Mass production

T im

e pe

r un

it

0 . . .Startup

Volume (units)

LO7S.4 Outline some of the cautions and criticisms of learning curves.

7S.3 OPERATIONS STRATEGY Learning curves often have strategic implications for market entry, when an organization hopes to rapidly gain market share. The use of time-based strategies can contribute to this. An increase in market share creates additional volume, enabling operations to quickly move down the learning curve, thereby decreasing costs and, in the process, gaining a competitive advantage. In some instances, the volumes are sufficiently large that operations will shift from batch mode to repetitive operation, which can lead to further cost reductions.

Learning curve projections can be useful for capacity planning. Having realistic time esti- mates based on learning curve theory, managers can translate that information into actual capacity needs, and plan on that basis.

ste24102_ch07s_325-335.indd 331ste24102_ch07s_325-335.indd 331 11/1/13 12:27 PM11/1/13 12:27 PM

Final PDF to printer

332 Supplement to Chapter Seven Learning Curves

7. Users of learning curves sometimes fail to include carryover effects; previous experience with similar activities can reduce activity times, although it should be noted that the learning rate remains the same.

8. Shorter product life cycles, flexible manufacturing, and cross-functional workers can affect the ways in which learning curves may be applied.

1. If the learning phenomenon applies to all human activity, why isn’t the effect noticeable in mass production or high-volume assembly work?

2. Under what circumstances might a manager prefer a learning rate of approximately 100 percent (i.e., no “learning”)?

3. What would a learning percentage of 120 percent imply?

4. Explain how an increase in indirect labor cost can contribute to a decrease in direct labor cost per unit.

DISCUSSION AND REVIEW QUESTIONS

SOLVED PROBLEMS

An assembly operation has a 90 percent learning curve. The line has just begun work on a new item; the initial unit required 28 hours. Estimate the time that will be needed to complete:

a. The first five units.

b. Units 20 through 25.

Use the total time factor in the 90 percent column of Table 7S.1 .

Problem 1

Solution a. Table value: 4.339.

Estimated time for five units: 28(4.339) � 121.49 hours.

b. The total time for units 20 through 25 can be determined by subtraction:

H ours

Total time for 25 units: 28(17.713)  �  495.96

–Total time for 19 units: 28(13.974)  �   391.27

Total time for units 20 through 25 104.69

Problem 2 A manager wants to determine an appropriate learning rate for a new type of work his firm will undertake. He has obtained completion times for the initial six repetitions of a job of this type. What learning rate is appropriate?

Unit Completion Time (hours)

1 15.9

2 12.0

3 10.1

4 9.1

5 8.4

6 7.5

Solution According to theory, the time per unit decreases at a constant rate each time the output doubles (e.g., unit 1 to 2, 2 to 4, and 3 to 6). The ratios of these observed times will give us an approximate rate. Thus,

Unit 2

Unit 1

12.0

15.9 .755

Unit 4

Unit 2

9.1

12.0 .758

Unit 6

Unit 3

7.5

10.1 .743� � � � � �

Not surprisingly, there is some variability; the rate is usually a smoothed approximation. Even so, the ratios are fairly close—a rate of 75 percent seems reasonable in this case.

LO7S.5 Estimate learning rates from data on jobs times.

ste24102_ch07s_325-335.indd 332ste24102_ch07s_325-335.indd 332 11/1/13 12:27 PM11/1/13 12:27 PM

Final PDF to printer

Supplement to Chapter Seven Learning Curves 333

PROBLEMS 1. An aircraft company has an order to refurbish the interiors of 18 jet aircraft. The work has a learn- ing curve percentage of 80. On the basis of experience with similar jobs, the industrial engineering department estimates that the first plane will require 300 hours to refurbish. Estimate the amount of time needed to complete: a. The fifth plane. b. The first five planes. c. All 18 planes.

2. Estimate the time it will take to complete the fourth unit of a 12-unit job involving a large assembly if the initial unit required approximately 80 hours for each of these learning percentages: a. 72 percent b. 87 percent c. 95 percent

3. A contractor intends to bid on a job installing 30 airport security systems. Because this will be a new line of work for the contractor, he believes there will be a learning effect for the job. After reviewing time records from a similar type of activity, the contractor is convinced that an 85 percent curve is appropriate. He estimates that the first job will take his crew eight days to install. How many days should the contractor budget for a. The first 10 installations? b. The second 10 installations? c. The final 10 installations?

4. A job is known to have a learning percentage equal to 82. If the first unit had a completion time of 20 hours, estimate the times that will be needed to complete the third and fourth units.

5. A manager wants to determine an appropriate learning percentage for processing insurance claims for storm damage. Toward that end, times have been recorded for completion of each of the first six repetitions:

a. Determine the approximate learning percentage. b. Using your answer from part a, estimate the average completion time per repetition assuming a

total of 30 repetitions are planned.

6. Students in an operations management class have been assigned four similar homework problems. One student noted that it took her 50 minutes to complete the first problem. Assume that the four problems are similar and that a 70 percent learning curve is appropriate. How much time can this student plan to spend solving the remaining problems?

7. A subcontractor is responsible for outfitting six satellites that will be used for solar research. Four of the six have been completed in a total of 600 hours. If the crew has a 75 percent learning curve, how long should it take them to finish the last two units?

8. The fifth unit of a 25-unit job took 14.5 hours to complete. If a 90 percent learning curve is appropriate: a. How long should it take to complete the last unit? b. How long should it take to complete the 10th unit? c. Estimate the average time per unit for the 25 units.

9. The labor cost to produce a certain item is $8.50 per hour. Job setup costs $50 and material costs are $20 per unit. The item can be purchased for $88.50 per unit. The learning rate is 90 percent. Overhead is charged at a rate of 50 percent of labor, materials, and setup costs.

Repetition 1 2 3 4 5 6

Time (minutes) 46 39 35 33 32 30

5. List the kinds of factors that create the learning effect.

6. Explain how changes in a process, once it is under way, can cause scallops in a learning curve.

7. Name some areas in which learning curves are useful.

8. What factors might cause a learning curve to tip up toward the end of a job?

9. “Users of learning curves sometimes fail to include carryover effects; previous experience with similar activities can reduce initial activity times, although it should be noted that the learning rate remains the same.” What is the implication of this item from the list of cautions and criticisms?

10. Identify an unethical action that involves the learning rate and the ethical principle it violates.

ste24102_ch07s_325-335.indd 333ste24102_ch07s_325-335.indd 333 11/28/13 11:50 PM11/28/13 11:50 PM

Final PDF to printer

334 Supplement to Chapter Seven Learning Curves

Request no. 1 2 3 4 5 6 7 8

Time (min.) 55.0 41.0 35.2 31.0 28.7 26.1 24.8 23.5

a. Determine the unit cost for 20 units, given that the first unit took 5 hours to complete. b. What is the minimum production quantity necessary to make production cost less than

purchase cost? 10. A firm has a training program for a certain operation. The progress of trainees is carefully

monitored. An established standard requires a trainee to be able to complete the sixth repetition of the operation in six hours or less. Those who are unable to do this are assigned to other jobs.

Currently, three trainees have each completed two repetitions. Trainee A had times of 9 hours for the first and 8 hours for the second repetition; trainee B had times of 10 hours and 8 hours for the first and second repetitions; and trainee C had times of 12 hours and 9 hours.

Which trainee(s) do you think will make the standard? Explain your reasoning.

11. The first unit of a job took 40 hours to complete. The work has a learning percentage of 88. The manager wants time estimates for units 2, 3, 4, and 5. Develop those time estimates.

12. A manager wants to estimate the remaining time that will be needed to complete a five-unit job. The initial unit of the job required 12 hours, and the work has a learning percentage of 77. Estimate the total time remaining to complete the job.

13. Kara is supposed to have a learning percentage of 82. Times for the first four units were 30.5, 28.4, 27.2, and 27.0 minutes. Does a learning percentage of 82 seem reasonable? Justify your answer using appropriate calculations.

14. The fifth unit of a 10-unit job took five hours to complete. The sixth unit has been worked on for two hours, but is not yet finished. Estimate the additional amount of time needed to finish the 10-unit job if the work has a 75 percent learning rate.

15. Estimate the number of repetitions each of the workers listed in the following table will require to reach a time of 7 hours per unit. Time is in hours.

16. Estimate the number of repetitions that new service worker Irene will require to achieve “standard” if the standard is 18 minutes per repetition. She took 30 minutes to do the initial repetition and 25 minutes to do the next repetition.

17. Estimate the number of repetitions each of the workers listed in the following table will require to achieve a standard time of 25 minutes per repetition. Time is in minutes.

18. A research analyst performs database searches for a variety of clients. According to her log, a new search requires approximately 55 minutes. Repeated requests on the same or similar topic take less and less time, as her log shows:

How many more searches will it take until the search time gets down to 19 minutes?

19. A job has an 85 percent learning curve. Estimate the time that will be needed to complete the fifth unit of the job. The time for the first unit is unknown. However, units 2 through 4 took a total of 28.14 hours to complete.

Trainee  T 1  T 2

Art 11 9.9

Sherry 10.5 8.4

Dave 12 10.2

Trainee  T 1  T 2

Beverly 36 31

Max 40 36

Antonio 37 30

ste24102_ch07s_325-335.indd 334ste24102_ch07s_325-335.indd 334 11/1/13 12:28 PM11/1/13 12:28 PM

Final PDF to printer

Supplement to Chapter Seven Learning Curves 335

An automobile manufacturer is conducting a product recall after it was discovered that a possible defect in the steering mechanism could cause loss of control in certain cars. The recall covers a span of three model years. The company sent out letters to car owners promising to repair the defect at no cost at any dealership.

The company’s policy is to pay the dealer a fixed amount for each repair. The repair is somewhat complicated, and the company expected learning to be a factor. In order to set a reasonable rate for repairs, com- pany engineers conducted a number of repairs themselves. It was then decided that a rate of $88 per repair would be appropriate, based on a flat hourly rate of $22 per hour and a 90 percent learning rate.

Shortly after dealers began making repairs, the company received word that several dealers were encountering resistance from workers who felt the flat rate was much too low and who were threatening to refuse to work on those jobs. One of the dealers collected data on job

times and sent that information to the company: Three mechanics each completed two repairs. Average time for the first unit was 9.6 hours, and average time for the second unit was 7.2 hours. The dealer has suggested a rate of $110 per repair.

You have been asked to investigate the situation and to prepare a report.

Questions

1. Prepare a list of questions that you will need to have answered in order to analyze this situation.

2. Prepare a list of observations regarding the information provided in the case.

3. What preliminary thoughts do you have on solutions/partial solutions to the points you have raised?

CASE Product Recall

Jaber, Mohamad Y. (ed.) Learning Curves: Theory, Models, and Applications. Boca Raton, FL: CRC Press, 2011.

Teplitz, Charles J. The Learning Curve Deskbook. Westport, CT: Greenwood, 1991.

SELECTED BIBLIOGRAPHY AND FURTHER

READINGS

ste24102_ch07s_325-335.indd 335ste24102_ch07s_325-335.indd 335 11/1/13 12:28 PM11/1/13 12:28 PM

Final PDF to printer

336

C H A P T E R

8 Location Planning and Analysis

After completing this chapter, you should be able to:

LO8.1 Identify some of the main reasons organizations need to make location decisions.

LO8.2 Explain why location decisions are important.

LO8.3 Discuss the options that are available for location decisions.

LO8.4 Discuss key considerations related to global location decisions.

LO8.5 Outline the decision process for making location decisions.

LO8.6 Describe some of the key factors that guide service and retail location decisions.

LO8.7 Use the techniques presented to evaluate location alternatives.

LEARNING OBJECTIVES

CHAPTER OUTLINE

8.1 The Need for Location Decisions, 337

8.2 The Nature of Location Decisions, 338 Strategic Importance of Location Decisions,  338

Objectives of Location Decisions, 339

Supply Chain Considerations, 339

Location Options, 339

8.3 Global Locations, 340 Facilitating Factors, 340

Benefits, 340

Disadvantages, 341

Risks, 341

Managing Global Operations, 342

Automation, 342

8.4 General Procedure for Making Location Decisions, 342

8.5 Identifying a Country, Region, Community, and Site, 343 Identifying a Country, 345

Identifying a Region, 346

Identifying a Community, 347

Identifying a Site, 348

Multiple Plant Manufacturing Strategies, 349

Geographic Information Systems, 350

8.6 Service and Retail Locations, 351

8.7 Evaluating Location Alternatives, 353 Locational Cost-Profit-Volume Analysis, 353

The Transportation Model, 354

Factor Rating, 355

The Center of Gravity Method, 356

Case: Hello, Walmart? 364

ste24102_ch08_336-365.indd 336ste24102_ch08_336-365.indd 336 11/1/13 12:29 PM11/1/13 12:29 PM

Final PDF to printer

337

When a well-known real estate broker was asked what the three most important determinants of the value of a property are, he said, “That’s easy. Location, location, and location.”

In the residential real estate market, location is an important factor. Although the style of house, number of bedrooms and bathrooms, level of maintenance, and modernity of the kitchen undoubtedly enter into the picture, some locations are just more desirable than others.

In many respects, the choice of location for a business organization is every bit as important as it is for a house, although for different reasons.

Location decisions represent a key part of the strategic planning process of virtually every organization. And, although it might appear that location decisions are one-time problems pertaining to new organizations, existing organizations often have a bigger stake in these kinds of decisions than new organizations.

This chapter examines location analysis. It begins with a brief overview of the reasons firms must make location decisions, the nature of these decisions, and a general procedure for developing and evaluating location alternatives.

LO8.1 Identify some of the main reasons organizations need to make location decisions.

8.1 THE NEED FOR LOCATION DECISIONS Existing organizations may need to make location decisions for a variety of reasons. Firms such as banks, fast-food chains, supermarkets, and retail stores view locations as part of marketing strategy, and they look for locations that will help them to expand their markets. Basically, the location decisions in those cases reflect the addition of new locations to an existing system.

A similar situation occurs when an organization experiences a growth in demand for its products or services that cannot be satisfied by expansion at an existing location. The addition of a new location to complement an existing system is often a realistic alternative.

Some firms face location decisions through depletion of basic inputs. For example, fishing and logging operations are often forced to relocate due to the temporary exhaustion of fish or forests at a given location. Mining and petroleum operations face the same sort of situation, although usually with a longer time horizon.

ste24102_ch08_336-365.indd 337ste24102_ch08_336-365.indd 337 11/1/13 12:29 PM11/1/13 12:29 PM

Final PDF to printer

338 Chapter Eight Location Planning and Analysis

An aerial view of an oil plant along the Kill Van Kull, Bayonne, New Jersey. Sea transportation was a key consideration in its location. The Kill Van Kull has been one of the most important channels in commerce throughout the region, providing a passage for marine traffic between Manhattan and the industrial towns of New Jersey. It currently provides the principal access for oceangoing container ships to Port Newark–Elizabeth Marine Terminal, the busiest port facility in the eastern United States and the principal marine terminal for New York Harbor.

For other firms, a shift in markets causes them to consider relocation, or the costs of doing business at a particular location reach a point where other locations begin to look more attractive.

8.2 THE NATURE OF LOCATION DECISIONS Location decisions for many types of businesses are made infrequently, but they tend to have a significant impact on the organization. In this section we look at the importance of location decisions, the usual objectives managers have when making location choices, and some of the options that are available to them.

Strategic Importance of Location Decisions Location decisions are closely tied to an organization’s strategies. For example, a strategy of being a low-cost producer might result in locating where labor or material costs are low, or locating near markets or raw materials to reduce transportation costs. A strategy of increasing profits by increasing market share might result in locating in high-traffic areas, and a strategy that emphasizes convenience for the customer might result in having many locations where customers can transact their business or make purchases (e.g., branch banks, ATMs, service stations, fast-food outlets).

Location choices can impact capacity and flexibility. Certain locations may be subject to space constraints that limit future expansion options. Moreover, local restrictions may restrict the types of products or services that can be offered, thus limiting future options for new products or services.

Location decisions are strategically important for other reasons as well. One is that they entail a long-term commitment, which makes mistakes difficult to overcome. Another is that location decisions often have an impact on investment requirements, operating costs and revenues, and operations. A poor choice of location might result in excessive transportation costs, a shortage of qualified labor, loss of competitive advantage, inadequate supplies of raw materials, or some similar condition that is detrimental to operations. For services, a poor location could result in lack of customers and/or high operating costs. For both manufactur- ing and services, location decisions can have a significant impact on competitive advantage. And another reason for the importance of location decisions is their strategic importance to supply chains.

LO8.2 Explain why location decisions are important.

ste24102_ch08_336-365.indd 338ste24102_ch08_336-365.indd 338 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

Chapter Eight Location Planning and Analysis 339

Objectives of Location Decisions As a general rule, profit-oriented organizations base their decisions on profit potential, whereas nonprofit organizations strive to achieve a balance between cost and the level of customer ser- vice they provide. It would seem to follow that all organizations attempt to identify the “best” location available. However, this is not necessarily the case.

In many instances, no single location may be significantly better than the others. There may be numerous acceptable locations from which to choose, as shown by the wide variety of locations where successful organizations can be found. Furthermore, the number of pos- sible locations that would have to be examined to find the best location may be too large to make an exhaustive search practical. Consequently, most organizations do not set out with the intention of identifying the one best location; rather, they hope to find a number of acceptable locations from which to choose.

Location criteria can depend on where a business is in the supply chain. For instance, at the retail end of a chain, site selection tends to focus more on accessibility, consumer demograph- ics (population density, age distribution, average buyer income), traffic patterns, and local customs. Businesses at the beginning of a supply chain, if they are involved in supplying raw materials, are often located near the source of the raw materials. Businesses in the middle of the chain may locate near suppliers or near their markets, depending on a variety of circum- stances. For example, businesses involved in storing and distributing goods often choose a central location to minimize distribution costs.

Web-based retail businesses are much less dependent on location decisions; they can exist just about anywhere.

Supply Chain Considerations Supply chain management must address supply chain configuration. This includes determin- ing the number and location of suppliers, production facilities, warehouses, and distribution centers. The location of these facilities can involve a long-term commitment of resources, so known risks and benefits should be considered carefully. A related issue is whether to have centralized or decentralized distribution. Centralized distribution generally yields scale econ- omies as well as tighter control than decentralized distribution, but it sometimes incurs higher transportation costs. Decentralized distribution tends to be more responsive to local needs.

The importance of these decisions is underscored by the fact that they reflect the basic strategy for accessing customer markets, and the decisions will have a significant impact on costs, revenues, and responsiveness.

The quantitative techniques described in this chapter can be helpful in evaluating alter- native supply chain configurations. Also, Chapter 15, Supply Chain Management, provides additional insights.

Location Options Managers of existing companies generally consider four options in location planning.

Expand an existing facility. This option can be attractive if there is adequate room for expansion, especially if the location has desirable features that are not readily available elsewhere. Expansion costs are often less than those of other alternatives.

Add new locations while retaining existing ones. This is done in many retail opera- tions. In such cases, it is essential to take into account what the impact will be on the total system. Opening a new store in a shopping mall may simply draw customers who already patronize an existing store in the same chain, rather than expand the market. On the other hand, adding locations can be a defensive strategy designed to maintain a market share or to prevent competitors from entering a market.

Shut down at one location and move to another. An organization must weigh the costs of a move and the resulting benefits against the costs and benefits of remaining in an exist- ing location. A shift in markets, exhaustion of raw materials, and the cost of operations often cause firms to consider this option seriously.

ste24102_ch08_336-365.indd 339ste24102_ch08_336-365.indd 339 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

340 Chapter Eight Location Planning and Analysis

Do nothing. If a detailed analysis of potential locations fails to uncover benefits that make one of the previous three alternatives attractive, a firm may decide to maintain the status quo, at least for the time being.

8.3 GLOBAL LOCATIONS Globalization has opened new markets, and it has meant increasing dispersion of manufactur- ing and service operations around the world. In addition, many companies are outsourcing operations to other companies in foreign locations. In the past, companies tended to operate from a “home base” that was located in a single country. Now, companies are finding strategic and tactical reasons to globalize their operations. As they do, some companies are profiting from their efforts, while others are finding the going tough, and all must contend with issues involved in managing global operations.

In this section, we examine some of the reasons for globalization, the benefits, disadvan- tages, risks, and issues related to managing global operations.

Facilitating Factors There are a number of factors that have made globalization attractive and feasible for business organizations. Two key factors are trade agreements and technological advances.

Trade Agreements. Barriers to international trade such as tariffs and quotas have been reduced or eliminated with trade agreements such as the North American Free Trade Agree- ment (NAFTA), the General Agreement on Tariffs and Trade (GATT), and the U.S.–China Trade Relations Act. Also, the European Union has dropped many trade barriers, and the World Trade Organization is helping to facilitate free trade.

Technology. Technological advances in communication and information sharing have been very helpful. These include faxing capability, e-mail, cell phones, teleconferencing, and the Internet.

Benefits Companies are discovering a wide range of benefits in globalizing their operations. Here is a list of some of the benefits, although it is important to recognize that not all benefits apply to every situation:

Markets. Companies often seek opportunities for expanding markets for their goods and services, as well as better serving existing customers by being more attuned to local needs and having a quicker response time when problems occur.

Cost savings. Among the areas for potential cost saving are transportation costs, labor costs, raw material costs, and taxes. High production costs in Germany have contributed to a number of German companies locating some of their production facilities in lower- cost countries. Among them are industrial products giant Siemens, AG (a semiconductor plant in Britain), drug makers Bayer, AG (a plant in Texas), and Hoechst, AG (a plant in China), and automakers Mercedes (plants in Spain, France, and Alabama) and BMW (a plant in Spartanburg, South Carolina).

Legal and regulatory. There may be more favorable liability and labor laws, and less- restrictive environmental and other regulations.

Financial. Companies can avoid the impact of currency changes that can occur when goods are produced in one country and sold in other countries. Also, a variety of incen- tives may be offered by national, regional, or local governments to attract businesses that will create jobs and boost the local economy. For example, state incentives, and workforce and land availability and cost, helped convince Nissan to build a huge assem- bly plant in Canton, Mississippi, and Mercedes to build an assembly plant in Vance,

LO8.3 Discuss the options that are available for location decisions.

ste24102_ch08_336-365.indd 340ste24102_ch08_336-365.indd 340 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

Chapter Eight Location Planning and Analysis 341

A worker inspects cans of Coca-Cola on the production line at a plant in the Middle East. Coke production overseas expands markets and serves local customers.

Alabama. An added benefit came when suppliers for these plants also set up facilities in the region.

Other. Globalization may provide new sources of ideas for products and services, new perspectives on operations, and solutions to problems.

Disadvantages There are a number of disadvantages of having global operations. These can include the following:

Transportation costs. High transportation costs can occur due to poor infrastructure or having to ship over great distances, and the resulting costs can offset savings in labor and materials costs.

Security costs. Increased security risks and theft can increase costs. Also, security at international borders can slow shipments to other countries.

Unskilled labor. Low labor skills may negatively impact quality and productivity, and the work ethic may differ from that in the home country. Additional employee training may be required.

Import restrictions. Some countries place restrictions on the importation of manufac- tured goods, so having local suppliers avoids those issues.

Criticisms. Critics may argue that cost savings are being generated through unfair prac- tices such as using sweatshops, in which employees are paid low wages and made to work in poor conditions; using child labor; and operating in countries that have less strin- gent environmental requirements.

Productivity. Low labor productivity may offset low labor costs or other advantages.

Risks Political. Political instability and political unrest can create risks for personnel safety and the safety of assets. Moreover, a government might decide to nationalize facilities, taking them over.

LO8.4 Discuss key consider- ations related to global location decisions.

ste24102_ch08_336-365.indd 341ste24102_ch08_336-365.indd 341 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

342 Chapter Eight Location Planning and Analysis

Terrorism. Terrorism continues to be a threat in many parts of the world, putting person- nel and assets at risk and decreasing the willingness of domestic personnel to travel to or work in certain areas.

Economic. Economic instability might create inflation or deflation, either of which can negatively impact profitability.

Legal. Laws and regulations may change, reducing or eliminating what may have been key benefits.

Ethical. Corruption and bribery, common in some countries, may be illegal in a company’s home country (e.g., illegal in the United States). This poses a number of issues. One is how to maintain operations without resorting to bribery. Another is how to prevent employees from doing this, especially when they may be of local origin and used to transacting business in this way.

Cultural. Cultural differences may be more real than apparent. Walmart discovered that fact when it opened stores in Japan. Although Walmart has thrived in many countries on its reputation for low-cost items, Japanese consumers associated low cost with low qual- ity, so Walmart had to rethink its strategy for the Japanese market.

Quality. Lax quality controls can lead to recalls and liability issues.

Managing Global Operations Although global operations offer many benefits, these operations often create new issues for management to deal with. For example, language and cultural differences increase the risk of miscommunication and may also interfere with developing trust that is important in busi- ness relationships. Management styles may be quite different, so tactics that work well in one country may not work in another. Increased travel distances and related travel times and costs may result in a decreased tendency for face-to-face meetings and management site visits. Also, coordination of far-flung operations can be more difficult. Managers may have to deal with corruption and bribery as well as differences in work ethic. The level of technology may be lower, and the resistance to technological change may be higher than expected, making the integration of new technologies more difficult. Domestic personnel may resist relocating, even temporarily.

Automation Automation is having a major influence on the decision of where to produce goods, particu- larly if the main markets are domestic. Low labor costs in foreign locations have long been cited as a key reason for using foreign locations for production. However, rising labor costs in some developing countries and poor safety records, the benefits of short transportation times with domestic locations, and advances in automation are causing many companies to take a new look at the question of where production should be done.

8.4 GENERAL PROCEDURE FOR MAKING LOCATION DECISIONS The way an organization approaches location decisions often depends on its size and the nature or scope of its operations. New or small organizations tend to adopt a rather infor- mal approach to location decisions. New firms typically locate in a certain area simply because the owner lives there. Similarly, managers of small firms often want to keep oper- ations in their backyard, so they tend to focus almost exclusively on local alternatives. Large established companies, particularly those that already operate in more than one location, tend to take a more formal approach. Moreover, they usually consider a wider range of geographic locations. The discussion here pertains mainly to a formal approach to location decisions.

LO8.5 Outline the decision process for making location decisions.

ste24102_ch08_336-365.indd 342ste24102_ch08_336-365.indd 342 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

Chapter Eight Location Planning and Analysis 343

Cargo trucks carry containers in and out of the Port of Singapore. The terminal is the world’s second busiest (now surpassed by the Port of Shanghai), handling about one-fifth of the world’s total container transshipments. It connects with 200 shipping lines with connections to 600 ports in 123 countries. This includes daily sailings to every major port in the world.

The general procedure for making location decisions usually consists of the following steps:

1. Decide on the criteria to use for evaluating location alternatives, such as increased revenues, decreased cost, or community service.

2. Identify important factors, such as location of markets or raw materials. The factors will differ depending on the type of facility. For example, retail, manufacturing, distribution, healthcare, and transportation all have differing factors that guide their location decisions.

3. Develop location alternatives: a. Identify a country or countries for location. b. Identify the general region for a location. c. Identify a small number of community alternatives.

d. Identify site alternatives among the community alternatives.

4. Evaluate the alternatives and make a selection.

Step 1 is simply a matter of managerial preference. Steps 2 through 4 are discussed on the following pages.

8.5 IDENTIFYING A COUNTRY, REGION, COMMUNITY, AND SITE Many factors influence location decisions. However, it often happens that one or a few factors are so important that they dominate the decision. For example, in manufacturing, the potentially dominating factors usually include availability of an abundant energy and water supply and proximity to raw materials. Thus, nuclear reactors require large amounts of water for cooling, heavy industries such as steel and aluminum production need large amounts of electricity, and so on. Transportation costs can be a major factor. In service organizations, possible dominating factors are market related and include traffic patterns, convenience, and competitors’ locations, as well as proximity to the market. For example, car rental agencies locate near airports and midcity, where their customers are. Note, too, that many of the factors discussed pertain to supply chain facilities as well as operations facilities.

ste24102_ch08_336-365.indd 343ste24102_ch08_336-365.indd 343 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

344 Chapter Eight Location Planning and Analysis

anticipated. “Most of the savings we had hoped for never materialized,” says LeRoy Pingho, a senior executive who oversaw the relocation.

Moving Expenses When the move was announced, many rank-and-file workers were enthusiastic. MCI’s relocation policy paid for every expense imagin- able. Costing an average of $100,000 per employee, it included up to six months of temporary housing and living expenses, private-school tuition for workers’ children and a full month’s pay for miscellaneous expenses. And there were exceptional housing bargains. “In Alexan- dria, [Va.,] we had a tiny place on a 50-by-112-foot lot,” says Jerome Sabolik, a senior software engineer. “For the same money, we got a 3,000-square-foot house on 2  ½ acres.” Thousands of workers—far more than Mr. Liebhaber expected—took advantage of the offer, under- cutting his plans to recruit lower-cost employees in Colorado.

But there was far less enthusiasm among senior managers. James Zucco, Mr. Ditchfield’s successor and the head of Systems Engineering, stayed behind and eventually left to join AT&T Corp. Also staying put was Gary Wiesenborn, the division’s No. 2 executive, who later moved to Bell Atlantic Corp. Mr. Pingho, who oversaw the division’s financial plan- ning and budgeting, declined to move and quit in 1993.

There was also significant fallout among the division’s minority pop- ulation. Although MCI declines to provide specific numbers, it confirms there was a reduction. According to former employees who had access to Equal Employment Opportunity Commission data, there were roughly 1,300 African-Americans on Systems Engineering’s staff and a com- bined 700 Asians and Hispanics before the relocation. Since the reloca- tion, minority representation has been cut almost in half, to about 600 blacks and a combined 500 Asians and Hispanics. “It was a disaster for diversity,” Mr. Ditchfield says.

But MCI officials say that despite the reduction, its Colorado division is still more ethnically diverse than other local companies.

Questions

1. What were the most severe fallouts from the move to Colorado? 2. Given the warnings from senior executives about the move, what

additional information should have been sought before making the final decision on whether to move?

Source: Alex Markels, “Innovative MCI Unit Finds Culture Shock in Colorado Springs,” The Wall Street Journal © 1996 Dow Jones & Company, Inc. Used with permission.

Alex Markels Convinced this town’s spectacular setting would inspire his workers, Richard Liebhaber figured “build it, and they will come.”

In 1991, the chief technology officer of MCI Communications Corp. decided to relocate MCI’s brain trust—the 4,000-employee Systems Engineering division that created numerous breakthrough products— from MCI’s Washington, D.C., headquarters to Colorado Springs. An avid skier, he believed the mountains, low crime rate, healthy climate, and rock-bottom real-estate prices would be “a magnet for the best and brightest” computer software engineers.

He rejected warnings from at least half a dozen senior execu- tives that Colorado Springs’ isolated and politically conservative set- ting would actually repel the eclectic, ethnically diverse engineers MCI hoped to attract. Mr. Liebhaber argued that new hires would jump at the chance to live in ski country, while veterans would stay longer, reducing MCI’s more than 15% annual turnover rate in Washington. The move, he contended, would also save money by cutting MCI’s facilities, labor, and recruiting costs. Besides, four other high-tech companies— including Digital Equipment Corp. and Apple Computer Inc.—had recently moved there. “One of the things that gave me more comfort was the fact that these other guys had selected Colorado Springs,” Mr. Liebhaber says.

He was mistaken. While many rank-and-file MCI employees, buoyed by generous relo-

cation packages, made the move, numerous key executives and engi- neers, and hundreds of the division’s 51% minority population, said no, or fled Colorado Springs soon after relocating.

Living in “Wonder Bread” “It was like living in a loaf of Wonder Bread,” says James Finucane, who is of Japanese descent and whose wife is from Argentina. A veteran senior engineer, Mr. Finucane was considered MCI’s top engineer until he took a job with a competitor back east in 1994. “There’s no culture, no diversity, no research university, no vitality or resiliency to the job market.”

The move isolated MCI’s engineers from top management and from marketing colleagues at headquarters, undermining the spontaneous collaborations that had generated some of the company’s most inno- vative products. Meanwhile, the professionals Mr. Liebhaber hoped to recruit from outside proved difficult and expensive to woo, pushing the move’s total cost to about $200 million—far more than MCI officials

READING Innovative MCI Unit Finds Culture Shock in Colorado Springs

or or r r

Once an organization has determined the most important factors, it will try to narrow the search for suitable alternatives to one geographic region. Then a small number of community- site alternatives are identified and subjected to detailed analysis. Human factors can be very important, as the following reading reveals. These might include the “culture shock” that is often experienced when employees are transferred to an environment that differs significantly from the current location—for instance, a move from a large city to a rural area, or from a rural area to a large city, or a move to an area that has a dramatically different climate.

ste24102_ch08_336-365.indd 344ste24102_ch08_336-365.indd 344 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

Chapter Eight Location Planning and Analysis 345

Identifying a Country Each country carries its own set of potential benefits and risks, and decision makers need to be absolutely clear on what those benefits and risks are as well as their likelihood of occurrence so that they can make an informed judgment on whether locating in that country is desirable. Some important issues have been noted in the previous section on global operations. Table 8.1 provides a listing of factors to consider.

In a report by the Council on Competitiveness and Deloitte Touche Tohmatsu that surveyed 400 global CEOs on their views on manufacturing competitiveness, the top three factors in determining where to locate manufacturing facilities were talent, labor costs, and energy costs. 1 And, in fact, many companies have outsourced some of their operations to foreign suppliers to take advantage of relatively low wage rates. Some U.S. manufacturing companies set up foreign subsidiaries to not only take advantage of low labor rates but also to avoid or delay paying taxes on their profits. With foreign-based subsidiaries, manufacturing compa- nies can ship their products to the United States and pay low tariffs. Furthermore, they can avoid taxes altogether by recording the profits overseas and not returning the earnings to the United States. They can do this through transfer pricing rules that allow U.S. companies to establish a price for transfer into the United States that keeps most of the profit in the foreign subsidiary. Those earnings are not subject to U.S. taxes unless or until they are returned as dividends to the U.S. parent corporation.

It is important to take all factors into account when contemplating the advantage of low labor costs. Other costs may negate that advantage. For example, low wage rates may also be accompanied by low labor productivity, resulting in a net cost per unit that is actually higher than what could be achieved domestically. Another consideration is transportation costs, which are generally higher for longer distances. Again, that could offset some or all of the low wage benefit. Then, too, longer transport time results in increased supply chain inventory and reduced agility.

1 Newsweek, July 19, 2010, p. 15.

Government a. Policies on foreign ownership of production facilities Local content requirements Import restrictions Currency restrictions Environmental regulations Local product standards Liability laws b. Stability issues Cultural differences Living circumstances for foreign workers and their dependents

Ways of doing business Religious holidays/traditions

Customer preferences Possible “buy locally” sentiment Labor Level of training and education of workers

Wage rates Labor productivity Work ethic Possible regulations limiting number of foreign employees Language differences

Resources Availability and quality of raw materials, energy, transportation infrastructure Financial Financial incentives, tax rates, inflation rates, interest rates Technological Rate of technological change, rate of innovations Market Market potential, competition Safety Crime, terrorism threat

TABLE 8.1 Factors relating to foreign locations

ste24102_ch08_336-365.indd 345ste24102_ch08_336-365.indd 345 11/28/13 11:56 PM11/28/13 11:56 PM

Final PDF to printer

346 Chapter Eight Location Planning and Analysis

Another factor to consider is the currency and exchange rate risk that occurs when produc- ing in one country and buying or selling in another country. Companies must transact business in the currency of the country they are involved in. However, because the value of a country’s currency fluctuates, exchange rates fluctuate, affecting the cost of supplies and the profits of sales in other countries when converting back to the country the company is located in.

Companies can obtain information about countries of interest from a variety of sources. Here are two useful Web sites:

CIA — https://www.cia.gov/library/publications/the-world-factbook/index.html

World Bank — http://www.doingbusiness.org/ExploreEconomies/?economyid � 2

Identifying a Region The primary regional factors involve raw materials, markets, and labor considerations.

Location of Raw Materials. Firms locate near or at the source of raw materials for three primary reasons: necessity, perishability, and transportation costs. Mining operations, farm- ing, forestry, and fishing fall under necessity. Obviously, such operations must locate close to the raw materials. Firms involved in canning or freezing of fresh fruits and vegetables, processing of dairy products, baking, and so on, must consider perishability when consider- ing location. Transportation costs are important in industries where processing eliminates much of the bulk connected with a raw material, making it much less expensive to transport the product or material after processing. Examples include aluminum reduction, cheese mak- ing, and paper production. Where inputs come from different locations, some firms choose to locate near the geographic center of the sources. For instance, steel producers use large quantities of both coal and iron ore, and many are located somewhere between the Appala- chian coal fields and iron ore mines. Transportation costs are often the reason that vendors locate near their major customers. Moreover, regional warehouses are used by supermarkets and other retail operations to supply multiple outlets. Often the choice of new locations and additional warehouses reflects the locations of existing warehouses or retail outlets.

Location of Markets. Profit-oriented firms frequently locate near the markets they intend to serve as part of their competitive strategy, whereas nonprofit organizations choose loca- tions relative to the needs of the users of their services. Other factors include distribution costs or the perishability of a finished product.

Competitive pressures for retail operations can be extremely vital factors. In some cases, a market served by a particular location may be too small to justify two or more competitors (e.g., one hamburger franchise per block), so that a search for potential locations tends to concentrate on locations without competitors. The opposite also might be true; it could be desirable to locate near competitors. Large department stores often locate near each other, and small stores like to locate in shopping centers that have large department stores as anchors. The large stores attract large numbers of shoppers who become potential customers in the smaller stores or in the other large stores.

Some firms must locate close to their markets because of the perishability of their prod- ucts. Examples include bakeries, flower shops, and fresh seafood stores. For other types of firms, distribution costs are the main factor in closeness to market. For example, sand and gravel dealers usually serve a limited area because of the high distribution costs associated with their products. Still other firms require close customer contact, so they too tend to locate within the area they expect to serve. Typical examples are tailor shops, home remodelers, home repair services, cabinetmakers, rug cleaners, and lawn and garden services.

Locations of many government services are near the markets they are designed to serve. Hence, post offices are typically scattered throughout large metropolitan areas. Police and emergency health care locations are frequently selected on the basis of client needs. For instance, police patrols often concentrate on high crime areas, and emergency health care facilities are usually found in central locations to provide ready access from all directions.

ste24102_ch08_336-365.indd 346ste24102_ch08_336-365.indd 346 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

Chapter Eight Location Planning and Analysis 347

Many foreign manufacturing companies have located manufacturing operations in the United States, because it is a major market for their products. Chief among them are auto- mobile manufacturers, most notably Japanese, but other nations are also represented. Another possible reason that Japanese producers decided to locate in the United States was to offset possible negative consumer sentiment related to job losses of U.S. workers. Thousands of U.S. auto workers are now employed in U.S. manufacturing plants of Japanese and other foreign companies.

Labor Factors. Primary labor considerations are the cost and availability of labor, wage rates in an area, labor productivity and attitudes toward work, and whether unions are a seri- ous potential problem.

Labor costs are very important for labor-intensive organizations. The shift of the textile industry from the New England states to southern states was due partly to labor costs.

Skills of potential employees may be a factor, although some companies prefer to train new employees rather than rely solely on previous experience. Increasing specialization in many industries makes this possibility even more likely than in the past. Although most companies concentrate on the supply of blue-collar workers, some firms are more interested in scientific and technical people as potential employees, and they look for areas with high concentrations of those types of workers.

Worker attitudes toward turnover, absenteeism, and similar factors may differ among potential locations—workers in large urban centers may exhibit different attitudes than work- ers in small towns or rural areas. Furthermore, worker attitudes in different parts of the coun- try or in different countries may be markedly different.

Some companies offer their current employees jobs if they move to a new location. How- ever, in many instances, employees are reluctant to move, especially when it means leaving families and friends. Furthermore, in families with two wage earners, relocation would require that one wage earner give up a job and then attempt to find another job in the new location.

Other Factors. Climate and taxes sometimes play a role in location decisions. For exam- ple, a string of unusually severe winters in northern states may cause some firms to seriously consider moving to a milder climate, especially if delayed deliveries and work disruptions caused by inability of employees to get to work have been frequent. Similarly, the business and personal income taxes in some states reduce their attractiveness to companies seeking new locations. Many companies have been attracted to some Sun Belt states by ample sup- plies of low-cost energy or labor, the climate, and tax considerations. Also, tax and monetary incentives are major factors in attracting or keeping professional sports franchises.

Identifying a Community Many communities actively try to attract new businesses, offering financial and other incen- tives, because they are viewed as potential sources of future tax revenues and new job opportu- nities. However, communities do not, as a rule, want firms that will create pollution problems or otherwise lessen the quality of life in the community. Local groups may actively seek to exclude certain companies on such grounds, and a company may have to go to great lengths to convince local officials that it will be a “responsible citizen.” Furthermore, some organizations discover that even though overall community attitude is favorable, there may still be consider- able opposition to specific sites from nearby residents who object to possible increased levels of noise, traffic, or pollution. Examples of this include community resistance to airport expan- sion, changes in zoning, construction of nuclear facilities, and highway construction.

From a company standpoint, a number of factors determine the desirability of a community as a place for its workers and managers to live. They include facilities for education, shop- ping, recreation, transportation, religious worship, and entertainment; the quality of police, fire, and medical services; local attitudes toward the company; and the size of the community. Community size can be particularly important if a firm will be a major employer in the com- munity; a future decision to terminate or reduce operations in that location could have a seri- ous impact on the economy of a small community.

ste24102_ch08_336-365.indd 347ste24102_ch08_336-365.indd 347 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

348 Chapter Eight Location Planning and Analysis

Other community-related factors are the cost and availability of utilities, environmental regulations, taxes (state and local, direct and indirect), and often a laundry list of enticements offered by state or local governments that can include bond issues, tax abatements, low-cost loans, grants, and worker training.

Another trend is just-in-time manufacturing techniques (see Chapter 14), which encourage suppliers to locate near their customers to reduce supplier lead times. For this reason, some U.S. firms are reconsidering decisions to locate offshore. Moreover, in light manufacturing (e.g., electronics), low-cost labor is becoming less important than nearness to markets; users of electronics components want suppliers that are close to their manufacturing facilities. One offshoot of this is the possibility that the future will see a trend toward smaller factories located close to markets. In some industries, small, automated microfactories with narrow product focuses will be located near major markets to reduce response time.

It is likely that advances in information technology will enhance the ability of manufactur- ing firms to gather, track, and distribute information that links purchasing, marketing, and distribution with design, engineering, and manufacturing. This will reduce the need for these functions to be located close together, thereby permitting a strategy of locating production facilities near major markets.

Ethical Issues. Ethical issues can arise during location searches, so it is important for com- panies and governments to have policies in place before that happens, and to keep ethical

aspects of decisions in mind while negotiating favorable treat- ment. For example, governments may offer a variety of incen- tives to companies to locate in their area, usually to obtain promised benefits from the companies. Companies should be careful to not promise more (e.g., jobs, longevity) or less (e.g., noise, traffic) than they can reasonably expect to deliver. Sim- ilarly, government negotiators should strive for an agreement that will ultimately benefit taxpayers, and use extreme caution in negotiating long-term arrangements that risk leaving tax- payers “holding the bag.” Also at issue are behind-the-scenes payments or favors to make a decision that would otherwise not be rated as highly.

Identifying a Site The primary considerations related to sites are land, transpor- tation, and zoning or other restrictions.

Evaluation of potential sites may require consulting with engineers or architects, especially in the case of heavy manu- facturing or the erection of large buildings or facilities with special requirements. Soil conditions, load factors, and drain- age rates can be critical and often necessitate certain kinds of expertise in evaluation.

Because of the long-term commitment usually required, land costs may be secondary to other site-related factors, such as room for future expansion, current utility and sewer capacities—and any limitations on these that could hinder future growth—and sufficient parking space for employees and customers. In addition, for many firms access roads for trucks or rail spurs are important.

Industrial parks may be worthy alternatives for firms involved in light manufacturing or assembly, warehouse operations, and customer service facilities. Typically, the land is already devel- oped—power, water, and sewer hookups have been attended to, and zoning restrictions do not require special attention. On the negative side, industrial parks may place restrictions on the kinds of activities that a company can conduct, which can limit

Microfactory  Small factory with a narrow product focus, located near major markets.

Apple establishes its stores in key locations with above-average household income and plenty of retail traffic. This store is located on Michigan Avenue in Chicago.

ste24102_ch08_336-365.indd 348ste24102_ch08_336-365.indd 348 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

Chapter Eight Location Planning and Analysis 349

options for future development of a firm’s products and services as well as the processes it may consider. Sometimes stringent regulations governing the size, shape, and architectural features of buildings limit managerial choice in these matters. Also, there may not be an adequate allow- ance for possible future expansion.

For firms with executives who travel frequently, the size and proximity of the airport or train station as well as travel connections can be important, although schedules and connec- tions are subject to change.

Table 8.2 provides a summary of the factors that affect location decisions.

Multiple Plant Manufacturing Strategies When companies have multiple manufacturing facilities, they can organize operations in sev- eral ways. One is to assign different product lines to different plants. Another is to assign dif- ferent market areas to different plants. And a third is to assign different processes to different plants. Each strategy carries certain cost and managerial implications, as well as competitive advantages.

Product Plant Strategy. With this strategy, entire products or product lines are pro- duced in separate plants, and each plant usually supplies the entire domestic market. This is essentially a decentralized approach, with each plant focusing on a narrow set of require- ments that entails specialization of labor, materials, and equipment along product lines. Specialization often results in economies of scale and, compared with multipurpose plants, lower operating costs. Plant locations may be widely scattered or clustered relatively close to one another.

Market Area Plant Strategy. With this strategy, plants are designed to serve a particular geographic segment of a market (e.g., the West Coast, the Northeast). Individual plants pro- duce most if not all of a company’s products and supply a limited geographical area. Although operating costs tend to be higher than those of product plants, significant savings on shipping costs for comparable products can be made. This arrangement is particularly desirable when

Level Factors Considerations

Regional Location of raw materials or supplies Proximity, modes and costs of transportation, quantity available

Location of markets Proximity, distribution costs, target market, trade practices/restrictions

Labor Availability (general and for specific skills), age distribution of workforce, work attitudes, union or nonunion, productivity, wage scales, unemployment compensation laws

Community Quality of life Schools, churches, shopping, housing, transpor- tation, entertainment, recreation, cost of living

Services Medical, fire, and police Attitudes Pro/con Taxes State/local, direct and indirect Environmental regulations State/local Utilities Cost and availability Development support Bond issues, tax abatement, low-cost loans,

grants Site Land Cost, degree of development required, soil char-

acteristics and drainage, room for expansion, parking

Transportation Type (access roads, rail spurs, air freight) Environmental/legal Zoning restrictions

TABLE 8.2 Factors affecting location decisions

ste24102_ch08_336-365.indd 349ste24102_ch08_336-365.indd 349 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

350 Chapter Eight Location Planning and Analysis

shipping costs are high due to volume, weight, or other factors. Such arrangements have the added benefit of rapid delivery and response to local needs. This approach requires central- ized coordination of decisions to add or delete plants, or to expand or downsize current plants due to changing market conditions.

Process Plant Strategy. With this strategy, different plants concentrate on different aspects of a process. Automobile manufacturers often use this approach, with different plants for engines, transmissions, body stamping, and even radiators. This approach is best suited to products that have numerous components; separating the production of components results in less confusion than if all production were carried out at the same location.

When an organization uses process plants, coordination of production throughout the system becomes a major issue and requires a highly informed, centralized administration to achieve effective operation. A key benefit is that individual plants are highly specialized and generate volumes that yield economies of scale. However, this approach usually involves additional shipping costs.

General-Purpose Plant Strategy. With this strategy, plants are flexible and capable of handling a range of products. This allows for quick response to product or market changes, although it can be less productive than a more focused approach.

Multiple plants have an additional benefit: the increase in learning opportunities that occurs when similar operations are being done in different plants. Similar problems tend to arise, and solutions to those problems as well as improvements in general in products and processes made at one plant can be shared with other plants.

Geographic Information Systems A geographic information system (GIS) is a computer-based tool for collecting, storing, retrieving, and displaying demographic data on maps. A GIS relies on an integrated system of computer hardware, software, data, and trained personnel to make available a wide range of geographically referenced information. Internet mapping programs used to obtain travel directions are an example of a GIS.

Many countries have an abundance of GIS data that can be accessed. For location analysis, a GIS makes it relatively easy to obtain detailed information on factors such as population density, age, incomes, ethnicity, traffic patterns, competitor locations, educational institu- tions, shopping centers, crime statistics, transportation resources, utilities, recreational facili- ties, maps and images, and a wealth of other information associated with a given location. Local governments use a GIS to organize, analyze, plan, and communicate information about community resources. And job seekers can use GISes for their searches.

Here are some of the ways businesses use geographic information systems:

• Logistics companies use GIS data to plan fleet activities such as routes and schedules based on the locations of their customers.

• Publishers of magazines and newspapers use a GIS to analyze circulation and attract advertisers.

• Real estate companies rely heavily on a GIS to make maps available online to prospec- tive home and business buyers.

• Banks use a GIS to help decide where to locate branch banks and to understand the composition and needs of different market segments.

• Insurance companies use a GIS to determine premiums based on population distribution, crime figures, and likelihood of natural disasters such as flooding in various locations, and to manage risk.

• Retailers are able to link information about sales, customers, and demographics to geographic locations in planning locations. They also use a GIS to develop marketing strategies and for customer mapping, site selection, sales projections, promotions, and other store portfolio management applications.

Geographic information system (GIS)  A computer- based tool for collecting, storing, retrieving, and displaying demo- graphic data on maps.

ste24102_ch08_336-365.indd 350ste24102_ch08_336-365.indd 350 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

Chapter Eight Location Planning and Analysis 351

• Utility companies use a GIS to balance supply and demand, and identify problem areas.

• Emergency services use a GIS to allocate resources to locations to provide adequate coverage where they are needed.

8.6 SERVICE AND RETAIL LOCATIONS Service and retail are typically governed by somewhat different considerations than manufac- turing organizations in making location decisions. For one thing, nearness to raw materials is usually not a factor, nor is concern about processing requirements. Customer access is some- times a prime consideration, as it is with banks and supermarkets, but not a consideration in others, such as call centers, catalog sales, and online services. Manufacturers tend to be cost-focused, concerned with labor, energy, and material costs and availability, as well as dis- tribution costs. Service and retail businesses tend to be profit or revenue focused, concerned with demographics such as age, income, and education, population/drawing area, competi- tion, traffic volume/patterns, and customer access/parking.

Retail sales and services are usually found near the center of the markets they serve. Exam- ples include fast-food restaurants, service stations, dry cleaners, and supermarkets. Quite often their products and those of their competitors are so similar that they rely on convenience to attract customers. Hence, these businesses seek locations with high population densities or high traffic. The competition/convenience factor is also important in locating banks, hotels and motels, auto repair shops, drugstores, newspaper kiosks, and shopping centers. Similarly, doctors, dentists, lawyers, barbers, and beauticians typically serve clients who reside within a limited area.

Retail and service organizations typically place traffic volume and convenience high on the list of important factors. Specific types of retail or service businesses may pay more attention to certain factors due to the nature of their business or their customers. If a busi- ness is unique, and has its own drawing power, nearness to competitors may not be a factor. However, retail businesses generally prefer locations that are near other retailers because of the higher traffic volumes and convenience to customers. For example, automobile dealer- ships often tend to locate near each other, and restaurants and specialty stores often locate in and around malls. When businesses locate near similar businesses it is referred to as clustering.

Medical services are often located near hospitals for the convenience of patients. Doctors’ offices may be located near hospitals, or grouped in other, centralized areas with other doc- tors’ offices. Available public transportation is often a consideration.

Good transportation and/or parking facilities can be vital to retail establishments. Down- town areas have a competitive disadvantage in attracting shoppers compared to malls because malls offer ample free parking and nearness to residential areas.

Customer safety and security can be key factors, particularly in urban settings, for all types of services that involve customers coming to the service location (as opposed, say, to in-home services such as home repair and rug cleaning).

Many retail firms have multiple outlets (locations). Among the questions that should be considered in such cases are the following:

1. How can sales, market share, and profit be optimized for the entire set of locations? Solutions might include some combination of upgrading facilities, expanding some sites, adding new outlets, and closing or changing the locations of some outlets.

2. What are the potential sales to be realized from each potential solution?

3. Where should outlets be located to maximize market share, sales, and profits without negatively impacting other outlets? This can be a key cause of friction between the operator of a franchise store and the franchising company.

4. What probable effects would there be on market share, sales, and profits if a competitor located nearby?

LO8.6 Describe some of the key factors that guide service and retail decisions.

Clustering  Similar types of businesses locate near each other.

ste24102_ch08_336-365.indd 351ste24102_ch08_336-365.indd 351 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

352 Chapter Eight Location Planning and Analysis

Table 8.3 briefly compares service/retail site selection criteria with manufacturing criteria.

Getting Better All The Time “There’s no question that technology now allows franchisors and fran- chisees to identify the strongest markets,” says David Powell, vice pres- ident of sales and marketing for geoVue. “There was a time when you didn’t have much choice but to rely on the local real estate agent on the ground.” No more.

Optimal use of these tools, says Powell, requires a collaborative effort between his company and its franchise clients, which include Dunkin’ Brands and Del Taco. “Most franchises know the habits and characteristics of their customers, and that’s critical information for identifying top locations.”

As the technology continues to evolve, it has moved from basic site selection to a more detailed market analysis that integrates ever more information from formerly separate databases. “It’s much more complex and offers a clearer insight,” says Powell. For example, geoVue provides a “market ranking and potential analysis” that essentially tells users which markets would be best to pursue based on their set of criteria. The firm’s “market optimization” tool sheds light on how best to carve out territories, helping to eliminate encroachment and cannibal- ization. And its “site screening” tool helps evaluate locations based on demographic and competitive data.

The end result, says Powell, is that franchises are opening up more sites more quickly—and they are higher quality locations.

Based on their “perfect store” profile, franchisors can also use geoVue and similar tools to evaluate performance at existing units, says Powell. “They can help you decide where you might need to close a store because of changing demographics or other factors revealed through site analysis,” he says.

Questions

1. In what ways have tech tools improved the process of site selection? 2. Describe how those same tools can lead to store closings or store

relocations.

Kerry Pipes , Franchising.com There was a time when franchise site selection was as simple (not to mention as rudimentary and often random) as pushing pins in a map on a wall. Maybe they turned out to be good sites, maybe they didn’t. But as technology continues to evolve and the tools are recalibrated to further refine the site selection process, the art is becoming a science.

Today, companies like SRC, geoVue, and ESRI offer state-of-the-art tools, analysis, and the most current market data to franchise clients everywhere. SRC offers a product called DemographicsNow, which can be customized for any franchise client. Arby’s, Yum! Brands, Chipotle Mexican Grill, and California Kitchen are just a few of their franchise clients.

Integrating Disparate Data Dean Stoecker, SRC’s CEO and president, says the company’s web- based application helps customers locate strong prospective locations by providing in-depth market research data from 19 different databases analyzing traffic volumes, concentration of other retail businesses, and even the franchises’ own proprietary data. Simply plug in the site char- acteristics criteria (based on responses to a series of questions) and a proposed location, and push a button. It’s all crunched and compiled in maps, reports, and models, depending on how you want the data reported.

“ DemographicsNow.com offers franchisees a complete and accu- rate resource for property data and the ability to quickly visualize and analyze retail locations and competitor sites,” says Stoecker. Ultimately, the tool allows franchisees to create more insightful development plans and be better equipped to make strategic decisions on new locations.

Although he doesn’t rule out the need to visit potential sites in per- son, Stoecker says today’s technology not only shows how a proposed site shapes up on paper, but also allows franchisees to view aerial pho- tographs of proposed sites and surrounding areas. “Technology can now provide an analysis that’s both faster and scalable, yet provide answers in ways everybody can understand,” says Stoecker.

Manufacturing/Distribution Service/Retail

Cost focus Revenue focus Transportation modes/costs Demographics: age, income, education Energy availability/costs Population/drawing area Labor cost/availability/skills Competition Building/leasing costs Traffic volume/patterns

Customer access/parking

TABLE 8.3 A comparison of service/retail considerations and manufacturing considerations

READING Site Selection Grows Up: Improved Tech Tools Make the Process Faster, Better

ste24102_ch08_336-365.indd 352ste24102_ch08_336-365.indd 352 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

Chapter Eight Location Planning and Analysis 353

8.7 EVALUATING LOCATION ALTERNATIVES There are a number of techniques that are helpful in evaluating location alternatives: loca- tional cost-profit-volume analysis, factor rating, and the center of gravity method.

Locational Cost-Profit-Volume Analysis The economic comparison of location alternatives is facilitated by the use of cost-profit-vol- ume analysis. The analysis can be done numerically or graphically. The graphical approach will be demonstrated here because it enhances understanding of the concept and indicates the ranges over which one of the alternatives is superior to the others.

The procedure for locational cost-profit-volume analysis involves these steps:

1. Determine the fixed and variable costs associated with each location alternative.

2. Plot the total-cost lines for all location alternatives on the same graph.

3. Determine which location will have the lowest total cost for the expected level of output. Alternatively, determine which location will have the highest profit.

This method assumes the following:

1. Fixed costs are constant for the range of probable output.

2. Variable costs are linear for the range of probable output.

3. The required level of output can be closely estimated.

4. Only one product is involved.

For a cost analysis, compute the total cost for each location:

Total cost FC� � �v Q (8–1)

where

FC  �  Fixed cost

v   �  Variable cost per unit

Q   �  Quantity or volume of output

Locational cost-profit- volume analysis  Technique for evaluating location choices in economic terms.

E X A M P L E 1 Stop Fixed and variable costs for four potential plant locations are shown below:

Location Fixed Cost per Year Variable Cost per Unit

A $250,000 $11

B 100,000 30

C 150,000 20

D 200,000 35

a. Plot the total-cost lines for these locations on a single graph.

b. Identify the range of output for which each alternative is superior (i.e., has the lowest total cost).

c. If expected output at the selected location is to be 8,000 units per year, which location would provide the lowest total cost?

e celx mhhe.com/stevenson12e

S O L U T I O N a. To plot the total-cost lines, select an output that is approximately equal to the expected out- put level (e.g., 10,000 units per year). Compute the total cost for each location at that level:

Fixed Cost � Variable Cost � Total Cost

A $250,000 � $11(10,000) � $360,000

B 100,000 � 30(10,000) � 400,000

C 150,000 � 20(10,000) � 350,000

D 200,000 � 35(10,000) � 550,000

LO8.6 Use the techniques presented to evaluate location alternatives.

ste24102_ch08_336-365.indd 353ste24102_ch08_336-365.indd 353 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

354 Chapter Eight Location Planning and Analysis

Plot each location’s fixed cost (at Output  �  0) and the total cost at 10,000 units; and connect the two points with a straight line. (See the accompanying graph.)

700

600

500

400

300

200

100

2 6 8 10 12 144 16

B superior C superior A superior

T o

ta l a

n n

u al

c o

st (

$0 00

)

0 Annual output (000 units)

D

B

C A

b. The approximate ranges for which the various alternatives will yield the lowest costs are shown on the graph. Note that location D is never superior. The exact ranges can be deter- mined by findying the output level at which lines B and C and lines C and A cross. To do this, set their total cost equations equal and solve for Q, the break-even output level. Thus, for B and C:

(B) $100,000 $30

(C) $150,000 $20� � �Q Q

Solving, you find Q   �  5,000 units per year.

For C and A:

(C) $150,000 $20

(A) $250,000 $11� � �Q Q

Solving, Q   �  11,111 units per year.

c. From the graph, you can see that for 8,000 units per year, location C provides the lowest total cost.

For a profit analysis, compute the total profit for each location:

Total profit ( ) FC� � �Q R v (8–2)

where

R   �  Revenue per unit

Solved Problem 2 at the end of the chapter illustrates profit analysis. Where the expected level of output is close to the middle of the range over which one alter-

native is superior, the choice is readily apparent. If the expected level of output is very close to the edge of a range, it means that the two alternatives will yield comparable annual costs, so management would be indifferent in choosing between the two in terms of total cost. However, it is important to recognize that, in most situations, other factors besides cost must also be con- sidered. Later in this section, a general scheme for including a broad range of factors is described. First, let’s look at another kind of cost often considered in location decisions: transportation costs.

The Transportation Model Transportation costs sometimes play an important role in location decisions. These can stem from the movement of either raw materials or finished goods. If a facility will be the sole source or destination of shipments, the company can include the transportation costs

ste24102_ch08_336-365.indd 354ste24102_ch08_336-365.indd 354 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

Chapter Eight Location Planning and Analysis 355

in a locational cost–volume analysis by incorporating the transportation cost per unit being shipped into the variable cost per unit. (If raw materials are involved, the transportation cost must be converted into cost per unit of output in order to correspond to other variable costs.)

When a problem involves shipment of goods from multiple sending points to multiple receiv- ing points, and a new location (sending or receiving point) is to be added to the system, the com- pany should undertake a separate analysis of transportation. In such instances the transportation model of linear programming is very helpful. It is a special-purpose algorithm used to determine the minimum transportation cost that would result if a potential new location were to be added to an existing system. It also can be used if a number of new facilities are to be added or if an entire new system is being developed. The model is used to analyze each of the configurations considered, and it reveals the minimum costs each would provide. This information can then be included in the evaluation of location alternatives. Solved Problem 1 illustrates how the results of a transportation analysis can be combined with the results of a locational cost–volume analysis.

The Web site for this book contains a module that provides complete coverage of the trans- portation model, including methods such as northwest corner, steppingstone, and Vogel’s aproximation method.

Factor Rating Factor rating is a technique that can be applied to a wide range of decisions ranging from personal (buying a car, deciding where to live) to professional (choosing a career, choosing among job offers). Here it is used for location analysis.

A typical location decision involves both qualitative and quantitative inputs, which tend to vary from situation to situation depending on the needs of each organization. Factor rating is a general approach that is useful for evaluating a given alternative and comparing alternatives. The value of factor rating is that it provides a rational basis for evaluation and facilitates com- parison among alternatives by establishing a composite value for each alternative that sum- marizes all related factors. Factor rating enables decision makers to incorporate their personal opinions and quantitative information in the decision process.

The following procedure is used to develop a factor rating:

1. Determine which factors are relevant (e.g., location of market, water supply, parking facilities, revenue potential).

2. Assign a weight to each factor that indicates its relative importance compared with all other factors.

3. Decide on a common scale for all factors (e.g., 1 to 100), and set a minimum acceptable score if necessary.

4. Score each location alternative.

5. Multiply the factor weight by the score for each factor, and sum the results for each location alternative.

6. Choose the alternative that has the highest composite score, unless it fails to meet the minimum acceptable score.

This procedure is illustrated in Example 2.

Factor rating  General approach to evaluating locations that includes quantitative and qualitative inputs.

E X A M P L E 2 A photo-processing company intends to open a new branch store. The following table con- tains information on two potential locations. Which is the better alternative?

Scores (Out of 100) Weighted Scores

Factor Weight Alt. 1 Alt. 2 Alternative 1 Alternative 2

Proximity to existing store .10 100 60 .10(100)  �  10.0 .10(60)  �   6.0

Traffic volume .05 80 80 .05(80)  �   4.0 .05(80)  �   4.0

Rental costs .40 70 90 .40(70)  �  28.0 .40(90)  �  36.0

Size .10 86 92 .10(86)  �   8.6 .10(92)  �   9.2

Layout .20 40 70 .20(40)  �   8.0 .20(70)  �  14.0

Operating costs .15 80 90 .15(80)  �   12.0 .15(90)  �   13.5

70.6 82.7

ste24102_ch08_336-365.indd 355ste24102_ch08_336-365.indd 355 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

356 Chapter Eight Location Planning and Analysis

S O L U T I O N Alternative 2 is better because it has the higher composite score.

In some cases, managers may prefer to establish minimum thresholds for composite scores. If an alternative fails to meet that minimum, they can reject it without further consideration. If none of the alternatives meets the minimum, this means that either additional alternatives must be identified and evaluated or the minimum threshold must be reevaluated.

The Center of Gravity Method The center of gravity method is a method to determine the location of a facility that will min- imize shipping costs or travel time to various destinations. For example, community planners use the method to determine the location of fire and public safety centers, schools, community centers, and such, taking into consideration locations of hospitals, senior living centers, popu- lation density, highways, airports, and retail businesses. The goal for police and firefighters is often to minimize travel time to answer emergency calls. The center of gravity method is also used for location planning for distribution centers, where the goal is typically to minimize distribution costs. The method treats distribution cost as a linear function of the distance and the quantity shipped. The quantity to be shipped to each destination is assumed to be fixed (i.e., will not change over time). An acceptable variation is that quantities are allowed to change, as long as their relative amounts remain the same (e.g., seasonal variations).

The method includes the use of a map that shows the locations of destinations. The map must be accurate and drawn to scale. A coordinate system is overlaid on the map to determine relative locations. The location of the (0,0) point of the coordinate system, and its scale, is unimportant. Once the coordinate system is in place, you can determine the coordinates of each destination. (See Figure 8.1 , parts A and B.)

If the quantities to be shipped to every location are equal, you can obtain the coordinates of the center of gravity (i.e., the location of the distribution center) by finding the average of the x coordinates and the average of the y coordinates (see Figure 8.1 ). These averages can be easily determined using the following formulas:

x x

n

y y

n

i

i

� �

� � (8–3)

where

x i   �   x coordinate of destination i

y i   �   y coordinate of destination i

n   �  Number of destinations

When the number of units to be shipped is not the same for all destinations (usually the case), a weighted average must be used to determine the center of gravity, with the weights

Center of gravity method  Method for locating a distribution center that mini- mizes distribution cost.

FIGURE 8.1 Center of gravity method

6

4

2

4 62 80 10

y

x

D2

D3

D4

D1

(3, 5)

(5, 4)

(8, 5)

(2, 2)

x

y Center of gravity

6

4

2

4 62 80 10

y

x

D2

D3

D4

D1

(3, 5) (5, 4)

(8, 5)

(2, 2)

Coordinates of D3

D2

D3

D4

D1 N

S

W E

Destination 2 Map

N

S

W E

N

S

W E

A. Map showing destinations B. Add a coordinate system C. Center of gravity

ste24102_ch08_336-365.indd 356ste24102_ch08_336-365.indd 356 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

Chapter Eight Location Planning and Analysis 357

being the quantities to be shipped. In some cases, the number of trips can be more important than quantities, so that metric would be used instead of quantities.

The appropriate formulas are

� �

� �

x x Q

Q

y y Q

Q

i i

i

i i

i

(8–4)

where

Q i   �  Quantity to be shipped to destination i

x i   �   x coordinate of destination i

y i   �   y coordinate of destination i

Hence, the center of gravity is at (4.5,4), which places it just west of destination D3 (see Figure 8.1C ).

E X A M P L E 3 Determine the coordinates of the center of gravity for the problem depicted in Figure 8.1C . Assume that the shipments from the center of gravity to each of the four destinations will be equal quantities.

e celx mhhe.com/stevenson12e

S O L U T I O N The coordinates of the destinations can be obtained from Figure 8.1B :

Destination x y

D1 2, 2

D2 3, 5

D3 5, 4

D4 8, 5

18 16

18

4

16

4 4.5 4

� �

� � �

� �

x x

n y

y

n i i

E X A M P L E 4 Suppose that the shipments for the problem depicted in Figure 8.1A are not all equal, but instead are the following:

Destination x y Weekly Quantity

D1 2, 2 800

D2 3, 5 900

D3 5, 4 200

D4 8, 5 100

2,000

Determine the center of gravity.

e celx mhhe.com/stevenson12e

Because the quantities to be shipped differ among destinations, you must use the weighted average formulas.

2(800) 3(900) 5(200) 8(100)

2,000

6,100

2,000 3.05 [round to 3]

2(800) 5(900) 4(200) 5(100)

2,000

7,400

2,000 3.7

x x Q

Q

y y Q

Q

i i

i

i i

i

� � � � �

� �

� � � � �

� �

∑ ∑

∑ ∑

Hence, the coordinates of the center of gravity are approximately (3,3.7). This would place it south of destination D2, which has coordinates of (3,5). (See Figure 8.2 .)

S O L U T I O N

ste24102_ch08_336-365.indd 357ste24102_ch08_336-365.indd 357 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

358 Chapter Eight Location Planning and Analysis

FIGURE 8.2 Center of gravity for Example 4

6

4

2

4 62 80 10

y

x

D2

D3

D4

D1

(3,5)

(5,4)

(8,5)

(2,2)

(3,3.7) N

S

W E

FIGURE 8.3 Solution for Example 4 7

6

5

4

3

2

1

0 0 2 4 6

Destinations Center of Gravity

8 10

See Figure 8.3 for a graph of the solution to Example 4. The problem can also be solved using the appropriate Excel template that is available on the text Web site.

KEY POINTS 1. Location decisions are strategic; they can have a significant impact on the success or failure of a business.

2. Very often, location decisions are long term and involve substantial cost, so it is important to devote an appropriate amount of effort to selecting a location.

3. Decision makers must not let the attractiveness of a few factors cloud the decision-making pro- cess. There are many factors to take into account when selecting a location. It is essential to identify the key factors and their relative importance, and then to use that information to evaluate location alternatives.

4. It is important to also factor in the impact that location choices will have on the supply chain.

SUMMARY Location decisions confront both new and existing organizations. Growth, market shifts, depletion of raw materials, and the introduction of new products and services are among the reasons organizations are concerned with location decisions. The importance of these decisions is underscored by the long- term commitment they typically involve and by their potential impact on the operating system.

The primary location options available to existing organizations are to expand an existing location, move to a new location, maintain existing facilities while adding another facility in a new location, or do nothing.

In practice, the major influences on location decisions are location of raw materials, labor supply, market considerations, community-related factors, site-related factors, and climate. Foreign locations may be attractive in terms of labor costs, abundance of raw materials, or as potential markets for a firm’s products or services. Problems organizations sometimes encounter in foreign countries include language differences, cultural differences, bias, and political instability.

A common approach to narrowing the range of location alternatives is to first identify a country or region that seems to satisfy overall needs and then identify a number of community-site alternatives for more in-depth analysis. A variety of methods are used to evaluate location alternatives. Those described in the chapter include locational cost-profit-volume analysis, factor rating, and the center of gravity method. The transportation model was mentioned briefly; the chapter supplement contains a more com- plete description of that subject.

There are numerous commercial software packages available for location analysis. In addition to the models described, many packages employ linear programming or mixed integer programming algo- rithms. In addition, some software packages use heuristic approaches to obtain reasonable solutions to location problems.

ste24102_ch08_336-365.indd 358ste24102_ch08_336-365.indd 358 11/28/13 11:55 PM11/28/13 11:55 PM

Final PDF to printer

Chapter Eight Location Planning and Analysis 359

KEY TERMS center of gravity method, 356 clustering, 351

SOLVED PROBLEMS

Problem 1 Cost analysis. A farm implements dealer is seeking a fourth warehouse location to comple- ment three existing warehouses. There are three potential locations: Charlotte, NC; Atlanta, GA; and Columbia, SC. Charlotte would involve a fixed cost of $4,000 per month and a variable cost of $4 per unit; Atlanta would involve a fixed cost of $3,500 per month and a variable cost of $5 per unit; and Columbia would involve a fixed cost of $5,000 per month and a variable cost of $6 per unit. Use of the Charlotte location would increase system transportation costs by $19,000 per month, Atlanta by $22,000 per month, and Columbia by $18,000 per month. Which location would result in the lowest total cost to handle 800 units per month?

Given: Volume  �  800 units per month Solution

FC per Month

Variable Cost per Unit, v

Transportation Cost per Month

Charlotte $4,000 $4 $19,000

Atlanta 3,500 5 22,000

Columbia 5,000 6 18,000

Monthly total cost  �  FC  �  VC  �  Transportation cost

Charlotte: $4,000  �  $4 per unit  �  800 units  �  $19,000  �  $26,200

Atlanta: 3,500  �   5 per unit  �  800 units  �   22,000  �  29,500

Columbia: 5,000  �   6 per unit  �  800 units  �   18,000  �  27,800

Hence, Charlotte would have the lowest total cost for this monthly volume.

Problem 2 Profit analysis. A manufacturer of staplers is about to lose its lease, so it must move to another location. Two sites are currently under consideration. Fixed costs would be $8,000 per month at site A and $9,400 per month at site B. Variable costs are expected to be $5 per unit at site A and $4 per unit at site B. Monthly demand has been steady at 8,800 units for the last several years and is not expected to deviate from that amount in the foreseeable future. Assume staplers sell for $6 per unit. Determine which location would yield the higher profit under these conditions.

Profit ( ) FC� � �Q R v Solution

Site Revenue FC v Monthly

Profit

A $52,800 $8,000 $44,000 $ 800

B $52,800 $9,400 $35,200 $8,200

Hence, site B is expected to yield the higher monthly profit.

factor rating, 355 geographic information system (GIS), 350

locational cost-profit-volume analysis, 353 microfactory, 348

Factor rating. Determine which location has the higher factor rating given the following information: Problem 3

Solution Location Scores

Factor Weight A B

Labor cost 5 20 40

Material cost 3 10 30

Transportation costs 2 50 10

ste24102_ch08_336-365.indd 359ste24102_ch08_336-365.indd 359 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

360 Chapter Eight Location Planning and Analysis

1. In what ways can the location decision have an impact on the production system?

2. Respond to this statement: “The importance of the location decision is often vastly overrated; the fact that virtually every type of business is located in every section of the country means there should be no problem in finding a suitable location.”

3. What community factors influence location decisions?

4. How are manufacturing and nonmanufacturing location decisions similar? Different?

5. What are the potential benefits of locating in foreign countries? Potential drawbacks?

6. What is factor rating, and how does it work?

7. Outline the general approach for developing location alternatives.

8. What are the basic assumptions in locational cost-profit-volume analysis?

9. Discuss recent trends in location and possible future strategies.

DISCUSSION AND REVIEW QUESTIONS

1. What trade-offs are involved in deciding to have a single large, centrally located facility instead of several smaller, dispersed facilities?

2. Who needs to be involved in facility location decisions?

3. Name several ways that technology has had an impact on location decisions.

TAKING STOCK

Combining the weights with the location scores, we can see that location B has the higher score:

Location Scores Weighted Scores

Factor Weight A B A B

Labor cost 5 20 40 5(20)  �  100 5(40)  �  200

Material cost 3 10 30 3(10)  �   30 3(30)  �   90

Transportation costs 2 50 10 2(50)  �   100 2(10)  �   20

230 310

Note that Location A has very low labor costs compared to Location B, but that is more than offset by its relatively high transportation costs compared to those of Location B.

Problem 4 Center of gravity. Determine the center of gravity location for these destinations:

Destination x,y

Coordinates Weekly Quantity

D1 3,5 20

D2 6,8 10

D3 2,7 15

D4 4,5 15

60

If the weekly quantities had all been equal, we could have used the two equations in Formula 8–3 to find the center of gravity. Because the weekly quantities are not all equal, we must use the equa- tions in Formula 8–4.

3(20) 6(10) 2(15) 4(15)

60

210

60 3.5

5(20) 8(10) 7(15) 5(15)

60

360

60 6.0

x xQ

Q

y yQ

Q

= Σ Σ

= + + +

= =

= Σ Σ

= + + +

= =

Hence, the center of gravity has the coordinates x   �  3.5 and y   �  6.

Solution

SOLVED PROBLEMS

ste24102_ch08_336-365.indd 360ste24102_ch08_336-365.indd 360 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

Chapter Eight Location Planning and Analysis 361

1. A company is considering the relocation of its manufacturing plant and administrative offices from a small city in the Midwest to a similar-sized city in the South. Approximately 20 percent of the residents of the city are employed by the company, and many others are employed in businesses such as banks, personal services, restaurants, shopping centers, and supermarkets that would suffer a decline in business if the company decides to relocate. Does the company have a social respon- sibility to factor into its decision the impact that its move would have on the city? Explain your reasoning.

2. The owner of a fast-food franchise has exclusive rights to operate in a medium-sized metropolitan area. The owner currently has a single outlet open, which has proved to be very popular, and there are often waiting lines of customers. The owner is therefore considering opening one or more out- lets in the area. What are the key factors that the owner should investigate before making a final decision? What trade-offs would there be in opening one additional site versus opening several additional sites?

3. Corruption and bribery are common in some countries. Would you avoid locating in such a country, or locate there and deal with it? If the latter, how would you deal with it?

4. Give three examples of unethical behavior involving location selection, and indicate which ethical principle is violated (see Chapter 1).

CRITICAL THINKING

EXERCISES

1. A newly formed firm must decide on a plant location. There are two alternatives under consideration: locate near the major raw materials or locate near the major customers. Locating near the raw materi- als will result in lower fixed and variable costs than locating near the market, but the owners believe there would be a loss in sales volume because customers tend to favor local suppliers. Revenue per unit will be $185 in either case. Using the following information, determine which location would produce the greater profit.

2. The owner of Genuine Subs, Inc., hopes to expand the present operation by adding one new outlet. She has studied three locations. Each would have the same labor and materials costs (food, serving containers, napkins, etc.) of $1.76 per sandwich. Sandwiches sell for $2.65 each in all locations. Rent and equipment costs would be $5,000 per month for location A, $5,500 per month for location B, and $5,800 per month for location C. a. Determine the volume necessary at each location to realize a monthly profit of $10,000. b. If expected sales at A, B, and C are 21,000 per month, 22,000 per month, and 23,000 per month,

respectively, which location would yield the greatest profits?

3. A small producer of machine tools wants to move to a larger building, and has identified two alterna- tives. Location A has annual fixed costs of $800,000 and variable costs of $14,000 per unit; location B has annual fixed costs of $920,000 and variable costs of $13,000 per unit. The finished items sell for $17,000 each. a. At what volume of output would the two locations have the same total cost? b. For what range of output would location A be superior? For what range would B be superior?

4. A company that produces pleasure boats has decided to expand one of its lines. Current facilities are insufficient to handle the increased workload, so the company is considering three alternatives, A (new location), B (subcontract), and C (expand existing facilities).

Alternative A would involve substantial fixed costs but relatively low variable costs: fixed costs would be $250,000 per year, and variable costs would be $500 per boat. Subcontracting would involve a cost per boat of $2,500, and expansion would require an annual fixed cost of $50,000 and a variable cost of $1,000 per boat.

a. Find the range of output for each alternative that would yield the lowest total cost. b. Which alternative would yield the lowest total cost for an expected annual volume of 150

boats? c. What other factors might be considered in choosing between expansion and subcontracting?

PROBLEMS

Omaha Kansas City

Annual fixed costs ($ millions) $1.2 $1.4

Variable cost per unit $36 $47

Expected annual demand (units) 8,000 12,000

ste24102_ch08_336-365.indd 361ste24102_ch08_336-365.indd 361 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

362 Chapter Eight Location Planning and Analysis

Factor Weight East #1 East #2 West

Initial cost 8 100 150 140

Traffic 10 40 40 30

Maintenance 6 20 25 18

Dock space 6 25 10 12

Neighborhood 4 12 8 15

5. Rework Problem 4b using this additional information: Expansion would result in an increase of $70,000 per year in transportation costs, subcontracting would result in an increase of $25,000 per year, and adding a new location would result in an increase of $4,000 per year.

6. A firm that has recently experienced enormous growth is seeking to lease a small plant in Memphis, TN; Biloxi, MS; or Birmingham, AL. Prepare an economic analysis of the three locations given the following information: Annual costs for building, equipment, and administration would be $40,000 for Memphis, $60,000 for Biloxi, and $100,000 for Birmingham. Labor and materials are expected to be $8 per unit in Memphis, $4 per unit in Biloxi, and $5 per unit in Birmingham. The Memphis location would increase system transportation costs by $50,000 per year, the Biloxi location by $60,000 per year, and the Birmingham location by $25,000 per year. Expected annual volume is 10,000 units.

7. A retired auto mechanic hopes to open a rustproofing shop. Customers would be local new-car dealers. Two locations are being considered, one in the center of the city and one on the outskirts. The central city location would involve fixed monthly costs of $7,000 and labor, materials, and transportation costs of $30 per car. The outside location would have fixed monthly costs of $4,700 and labor, materials, and transportation costs of $40 per car. Dealer price at either location will be $90 per car. a. Which location will yield the greatest profit if monthly demand is (1) 200 cars? (2) 300 cars? b. At what volume of output will the two sites yield the same monthly profit?

8. For each of the four types of organizations shown, rate the importance of each factor in terms of making location decisions using L   �  low importance, M  �  moderate importance, and H  �  high importance.

Location Score

Factor (100 points each) Weight A B C

Convenience .15 80 70 60

Parking facilities .20 72 76 92

Display area .18 88 90 90

Shopper traffic .27 94 86 80

Operating costs .10 98 90 82

Neighborhood .10 96 85 75

1.00

Factor Local Bank

Steel Mill

Food Warehouse

Public School

Convenience for customers _____ _____ _____ _____

Attractiveness of building _____ _____ _____ _____

Nearness to raw materials _____ _____ _____ _____

Large amounts of power _____ _____ _____ _____

Pollution controls _____ _____ _____ _____

Labor cost and availability _____ _____ _____ _____

Transportation costs _____ _____ _____ _____

Construction costs _____ _____ _____ _____

9. Using the following factor ratings, determine which location alternative (A, B, or C) should be chosen on the basis of maximum composite score.

10. Determine which location has the highest composite score:

ste24102_ch08_336-365.indd 362ste24102_ch08_336-365.indd 362 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

Chapter Eight Location Planning and Analysis 363

11. A manager has received an analysis of several cities being considered for a new office complex. The data (10 points maximum) are as follows: a. If the manager weights the factors equally, how would the locations stack up in terms of their

composite factor rating scores? b. If business services and construction costs are given weights that are double the weights of the

other factors, how would the locations stack up?

Location ( x,y )

A 3,7

B 8,2

C 4,6

D 4,1

E 6,4

Location ( x,y ) Weekly

Quantity

A 5,7 15

B 6,9 20

C 3,9 25

D 9,4 30

Location Score

Factor A B C

Business services 9 5 5

Community services 7 6 7

Real estate cost 3 8 7

Construction costs 5 6 5

Cost of living 4 7 8

Taxes 5 5 4

Transportation 6 7 8

12. A toy manufacturer produces toys in five locations throughout the country. Raw materials (primar- ily barrels of powdered plastic) will be shipped from a new, centralized warehouse whose location is to be determined. The monthly quantities to be shipped to each location are the same. A coor- dinate system has been established, and the coordinates of each location have been determined as shown. Determine the coordinates of the centralized warehouse.

13. A clothing manufacturer produces women’s clothes at four locations in Mexico. Relative locations have been determined, as shown in the table below. The location of a central shipping point for bolts of cloth must now be determined. Weekly quantities to be shipped to each location are also shown in the table. Determine the coordinates of the location that will minimize distribution costs.

14. A company that handles hazardous waste wants to minimize the shipping cost for shipments to a disposal center from five receiving stations it operates. Given the locations of the receiving stations and the volumes to be shipped daily, determine the location of the disposal center.

Location of Processing

Station, ( x,y ) Volume,

Tons per Day

10,5 26

4,1 9

4,7 25

2,6 30

8,7 40

ste24102_ch08_336-365.indd 363ste24102_ch08_336-365.indd 363 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

364 Chapter Eight Location Planning and Analysis

15. An analysis of sites for a distribution center has led to two possible sites (L1 and L2 on the map). The sites are comparable on every key factor. The one remaining factor is the center of gravity. Use the center of gravity method to select the better site. Monthly shipments will be the quantities listed in the table.

Destination Quantity

D1 900

D2 300

D3 700

D4 600

D5 1200

Walmart is one of the largest corporations in the world, and it has obviously enjoyed tremendous success. But while many welcome its location in their communities, others do not. Some complain that its presence has too many negative effects on a community, ranging from traffic congestion to anti-union sentiment to unfair competition.

Suppose Walmart has announced plans to seek approval from the planning commission of a small town to build a new store. Develop a list of the main arguments, pro and con, that could be presented at a

public hearing on the matter by members of each of these groups:

1. Owners of small businesses located nearby. 2. Town residents, and residents of nearby towns.

How might a Walmart representative respond to the negative criti- cisms that might be brought up, and what other benefits could the representative offer the planning board to bolster Walmart’s case for gaining the board’s approval?

CASE Hello, Walmart?

Ballou, Ronald H. Business Logistics Management. 5th ed. Upper Saddle River, NJ: Prentice Hall, 2004.

De Meirleir, Marcel. Location, Location, Location: A Plant Location and Site Selection Guide. London: Routledge, 2008.

Grimshaw, David J. Bringing Geographical Informa- tion Systems into Business. New York: John Wiley & Sons, 2000.

Mentzer, John T. “Seven Keys to Facility Location.” Supply Chain Management Review 12, no. 5, May 2008, p. 25.

Pick, James B. Geo-Business: GIS in the Digital Orga- nization. New York: Wiley, 2008.

SELECTED BIBLIOGRAPHY AND FURTHER READINGS

D1

D2

D4

D5

L2 L1

D3

ste24102_ch08_336-365.indd 364ste24102_ch08_336-365.indd 364 11/1/13 12:30 PM11/1/13 12:30 PM

Final PDF to printer

This page intentionally left blank

366

C H A P T E R

9

LEARNING OBJECTIVES

Management of Quality

9.1 Introduction, 367

9.2 The Evolution of Quality Management, 368

9.3 The Foundations of Modern Quality Management: The Gurus, 369

9.4 Insights on Quality Management, 372 Defining Quality: The Dimensions of Quality, 372

Assessing Service Quality, 374

The Determinants of Quality, 375

Responsibility for Quality, 376

Benefits of Good Quality, 377

The Consequences of Poor Quality, 377

The Costs of Quality, 378

Ethics and Quality Management, 380

9.5 Quality Awards, 380 The Baldrige Award, 381

The European Quality Award, 381

The Deming Prize, 381

9.6 Quality Certification, 381 ISO 9000, 14000, and 24700, 381

9.7 Quality and the Supply Chain, 383

9.8 Total Quality Management, 384 Obstacles to Implementing TQM, 386

Criticisms of TQM, 387

9.9 Problem Solving, and Process Improvement, 388 The Plan-Do-Study-Act Cycle, 388

Six Sigma, 390

9.10 Quality Tools, 392 Illustrations of the Use of Graphical Tools, 397

Methods for Generating Ideas, 398

9.11 Operations Strategy, 400

Cases: Chick-n-Gravy Dinner Line, 405

Tip Top Markets, 406

CHAPTER OUTLINE

After completing this chapter, you should be able to:

LO9.1 Discuss the philosophies of quality gurus.

LO9.2 Define the term quality as it relates to products and as it relates to services.

LO9.3 Identify the determinants of quality.

LO9.4 Explain why quality is important and the consequences of poor quality.

LO9.5 Describe and give examples of the costs associated with quality.

LO9.6 Discuss the importance of ethics in managing quality.

LO9.7 Compare the quality awards.

LO9.8 Discuss quality certification and its importance.

LO9.9 Describe TQM.

LO9.10 Give an overview of problem solving.

LO9.11 Give an overview of process improvement.

LO9.12 Describe the six sigma methodology.

LO9.13 Describe and use various quality tools.

ste24102_ch09_366-409.indd 366ste24102_ch09_366-409.indd 366 11/1/13 12:31 PM11/1/13 12:31 PM

Final PDF to printer

367

This chapter is the first of two chapters on quality. In this chapter you will learn about the evolution of quality management, definitions of quality, the costs of quality and the consequences of poor quality, some quality awards and quality certification, total quality management, and quality tools.

The importance of quality cannot be overstated; two key elements of every purchasing decision are price and quality. Con- sequently, having a focus on quality and quality improvement should be a part of every business organization, whether the organization’s business is making cars, selling electronic goods, providing financial services, providing medical services, or baking cookies.

9.1 INTRODUCTION Broadly defined, quality refers to the ability of a product or service to consistently meet or exceed customer requirements or expectations. However, different customers will have differ- ent requirements, so a working definition of quality is customer-dependent.

For a decade or so, quality was an important focal point in business. But after a while, the emphasis on quality began to fade, and quality took a backseat to other concerns. How- ever, there has been an upsurge recently in the need for attention to quality. Much of this has been driven by recent experience with costs and adverse publicity associated with wide- ranging recalls that have included automobiles, ground meat, toys, produce, dog food, and pharmaceuticals.

Quality  The ability of a product or service to consistently meet or exceed customer expectations.

ste24102_ch09_366-409.indd 367ste24102_ch09_366-409.indd 367 11/1/13 12:31 PM11/1/13 12:31 PM

Final PDF to printer

368 Chapter Nine Management of Quality

9.2 THE EVOLUTION OF QUALITY MANAGEMENT Prior to the Industrial Revolution, skilled craftsmen performed all stages of production. Pride of workmanship and reputation often provided the motivation to see that a job was done right. Lengthy guild apprenticeships caused this attitude to carry over to new workers. Moreover, one person or a small group of people were responsible for an entire product.

A division of labor accompanied the Industrial Revolution; each worker was then respon- sible for only a small portion of each product. Pride of workmanship became less meaningful because workers could no longer identify readily with the final product. The responsibility for quality shifted to the foremen. Inspection was either nonexistent or haphazard, although in some instances 100 percent inspection was used.

Frederick Winslow Taylor, the “Father of Scientific Management,” gave new emphasis to quality by including product inspection and gauging in his list of fundamental areas of manufacturing management. G. S. Radford improved Taylor’s methods. Two of his most significant contributions were the notions of involving quality considerations early in the

seems to be taking hold across all levels of the enterprise.

Quality Goes Upstream Talk to the manufacturing community about quality’s place in today’s environment and a clear pattern emerges—companies are finally grasping the “shared responsibility” aspect of Deming’s teachings. If quality is truly everyone’s responsibility, then the idea goes beyond the shop floor and into the front office, the service department and every- where else that provides value to customers and shareholders.

Ron Atkinson, chairman of the American Society for Quality (ASQ), has been watching this trend unfold. He describes the path that the idea of quality management in manufacturing has taken over the years.

“When I started in manufacturing 35 years ago, there was a police- man installed at the end of the line who looked at the parts and said, ‘That one is OK, that can be shipped and that one can’t.’ Gradually, it got to, ‘Let’s find better ways to do the checking,’ and then to, ‘Let’s find a way to predict what the parts are going to look like when they hit the end of the line,’ so we started doing defect prevention. Now where we’re at is that quality is expanding to cover everything, including out- side of the actual manufacturing process, to ‘how do we improve the quality of our HR services and support services? How do we improve the quality of the decisions that are made?”

According to Atkinson, concepts crucial to establishing a top- quality manufacturing line have been driven upstream, and expanded to become part of an overall continuous improvement strategy. “Qual- ity has become a systems approach, rather than focusing on one part at a time and whether it’s dimensionally correct. Quality is continuous improvement.”

Source: Excerpted from Brad Kenney, Industry Week, April 1, 2008.

Quality is more than just a statistical analysis tool for manufacturing lines. When done right, quality should encompass the entire enterprise.

Some 50 years after the advent of the total quality management (TQM) movement championed by W. Edwards Deming, manufactur- ers of all different sizes and stripes are still being dogged by high- profile manufacturing quality defects. The list is long, and getting longer every week, and crosses every manufacturing vertical. At least a token “quality program” is de rigueur for U.S. manufactur- ers, but many are still at lip-service level agreement with the means required to reach the necessary ends. However, talk is cheap— recalls are not.

From tainted beef to spinach, from lead-painted toys to poisoned pet food and blood thinners to exploding laptop batteries and malfunction- ing medical devices, the costs in scrapped product, consumer lawsuits and lost brand equity from defects and recalls are huge. Persistent, expensive and well-publicized recalls are striking companies with even the most stellar quality reputations. Toyota, the progenitor of a legend- ary quality-focused production system, has suffered a rash of defects that have caused the company to drop in Consumer Reports’ Annual Car Reliability Survey ratings—an important market barometer for its consumers.

On a perhaps less dangerous but equally costly front, Microsoft’s X-box 360 video gaming platform suffered a high-profile manufactur- ing defect that at one point had up to one-third of all units suffering from a “fatal error” (device owners called it “the red ring of death”) that led at least indirectly to markedly weaker competitive positioning in the crucial holiday selling season, as well as a warranty extension that is estimated at more than $6 billion in unplanned accruals.

Many of these manufacturing problems are coming from global supply chains, which is a failure as much of management as it is the defective products themselves. However bleak the situation may seem, all is not lost. Indeed, the responsibility for quality manufacturing finally

READING Whatever Happened to Quality?

ste24102_ch09_366-409.indd 368ste24102_ch09_366-409.indd 368 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 369

product design stage and making connections among high quality, increased productivity, and lower costs.

In 1924, Bell Telephone Laboratories introduced statistical control charts that could be used to monitor production. Around 1930, H. F. Dodge and H. G. Romig, also of Bell Labs, introduced tables for sampling. Nevertheless, statistical quality control procedures were not widely used until World War II, when the U.S. government began to require vendors to use them.

World War II caused a dramatic increase in emphasis on quality control. The U.S. Army refined sampling techniques for dealing with large shipments of arms from many suppliers. By the end of the 1940s, the U.S. Army, Bell Labs, and major universities were training engi- neers in other industries in the use of statistical sampling techniques. About the same time, professional quality organizations were emerging throughout the country. One of these orga- nizations was the American Society for Quality Control (ASQC, now known as ASQ). Over the years, the society has promoted quality with its publications, seminars and conferences, and training programs.

During the 1950s, the quality movement evolved into quality assurance. In the mid-1950s, total quality control efforts enlarged the realm of quality efforts from its primary focus on manufacturing to include product design and incoming raw materials. One important feature of this work was greater involvement of upper management in quality.

During the 1960s, the concept of “zero defects” gained favor. This approach focused on employee motivation and awareness, and the expectation of perfection from each employee. It evolved from the success of the Martin Company in producing a “perfect” missile for the U.S. Army.

In the 1970s, quality assurance methods gained increasing emphasis in services including government operations, health care, banking, and the travel industry.

Something else happened in the 1970s that had a global impact on quality. An embargo on oil sales instituted by the Organization of Petroleum Exporting Countries (OPEC) caused an increase in energy costs, and automobile buyers became more interested in fuel-efficient, lower-cost vehicles. Japanese auto producers, who had been improving their products, were poised to take advantage of these changes, and they captured an increased share of the auto- mobile market. The quality of their automobiles enhanced the reputation of Japanese produc- ers, opening the door for a wide array of Japanese-produced goods.

American producers, alarmed by their loss of market share, spent much of the late 1970s and the 1980s trying to improve the quality of their goods while lowering their costs.

The evolution of quality took a dramatic shift from quality assurance to a strategic approach to quality in the late 1970s. Up until that time, the main emphasis had been on finding and correcting defective products before they reached the market. It was still a reactive approach. The strategic approach is proactive, focusing on preventing mistakes from occurring in the first place. The idea is to design quality into products, rather than to find and correct defects after the fact. This approach has now expanded to include processes and services. Quality and profits are more closely linked. This approach also places greater emphasis on customer satisfaction, and it involves all levels of management as well as workers in a continuing effort to increase quality.

9.3 THE FOUNDATIONS OF MODERN QUALITY MANAGEMENT: THE GURUS A core of quality pioneers shaped current thinking and practice. This section describes some of their key contributions to the field.

Walter Shewhart. Walter Shewhart was a genuine pioneer in the field of quality con- trol, and he became known as the “father of statistical quality control.” He developed con- trol charts for analyzing the output of processes to determine when corrective action was

LO9.1 Discuss the philoso- phies of quality gurus.

ste24102_ch09_366-409.indd 369ste24102_ch09_366-409.indd 369 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

370 Chapter Nine Management of Quality

necessary. Shewhart had a strong influence on the thinking of two other gurus, W. Edwards Deming and Joseph Juran.

W. Edwards Deming. Deming, a statistics professor at New York University in the 1940s, went to Japan after World War II to assist the Jap- anese in improving quality and productivity. The Union of Japanese Scientists, who had invited Deming, were so impressed that in 1951, after a series of lectures presented by Deming, they established the Deming Prize , which is awarded annually to firms that distinguish themselves with quality management programs.

Although the Japanese revered Deming, he was largely unknown to business leaders in the United States. In fact, he worked with the Japanese for almost 30 years before he gained recognition in his own country. Before his death in 1993, U.S. com- panies turned their attention to Deming, embraced his philosophy, and requested his assistance in set- ting up quality improvement programs.

Deming compiled a famous list of 14 points he believed were the prescription needed to achieve quality in an organization (see Table 9.1 ). His message was that the cause of inefficiency and poor quality is the system, not the employ- ees. Deming felt that it was management’s responsibility to correct the system to achieve the desired results. In addition to the 14 points, Deming stressed the need to reduce variation in output (deviation from a standard), which can be accomplished by distinguishing between special causes of variation (i.e., correctable) and common causes of variation (i.e., random).

Deming’s concept of profound knowledge incorporates the beliefs and values about learn- ing that guided Japan’s rise to a world economic power.

Joseph M. Juran. Juran, like Deming, taught Japanese manufacturers how to improve the quality of their goods, and he, too, can be regarded as a major force in Japan’s success in quality.

Juran viewed quality as fitness-for-use. He also believed that roughly 80 percent of qual- ity defects are management controllable; thus, management has the responsibility to correct

Deming Prize  Prize estab- lished by the Japanese and awarded annually to firms that distinguish themselves with quality management programs.

1. Create constancy of purpose toward improvement of product and service. 2. Reduce levels of delays, mistakes, defective materials, and defective workmanship. 3. Cease dependence on mass inspection. ( Prevent defects rather than detect defects.) 4. Eliminate suppliers that cannot qualify with statistical evidence of quality. 5. Find problems. It is management’s job to work continually on system improvement. 6. Institute modern methods of training on the job. 7. Emphasize quality instead of volume alone. Management must prepare to take immediate action

on reports from foremen concerning barriers such as inherent defects, machines not maintained, poor tools, and fuzzy operational definitions.

8. Drive out fear, so that everyone may work effectively for the company. 9. Break down barriers between departments. People in research, design, sales, and production must

work as a team. 10. Eliminate goals and slogans asking for new levels of productivity without providing methods. 11. Eliminate work standards that prescribe numerical quotas. 12. Remove barriers that stand between the hourly worker and his right to pride of workmanship. 13. Institute a vigorous program of education and retraining. 14. Create a structure in top management that will push every day on the above 13 points.

Source: Adapted from W. Edwards Deming, Out of the Crisis, pp. 23 and 24. Copyright © 2000 MIT Press. Used with permission.

TABLE 9.1 Deming’s 14 points

W. Edwards Deming.

ste24102_ch09_366-409.indd 370ste24102_ch09_366-409.indd 370 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 371

this deficiency. He described quality management in terms of a trilogy consisting of quality planning, quality control, and quality improvement. According to Juran, quality planning is necessary to establish processes that are capable of meeting quality standards; quality control is necessary in order to know when corrective action is needed; and quality improvement will help to find better ways of doing things. A key element of Juran’s philosophy is the commit- ment of management to continual improvement.

Juran is credited as one of the first to measure the cost of quality, and he demonstrated the potential for increased profits that would result if the costs of poor quality could be reduced.

Armand Feigenbaum. Feigenbaum was instrumental in advancing the “cost of noncon- formance” approach as a reason for management to commit to quality. He recognized that quality was not simply a collection of tools and techniques, but a “total field.” According to Feigenbaum, it is the customer who defines quality.

Philip B. Crosby. Crosby developed the concept of zero defects and popularized the phrase “Do it right the first time.” He stressed prevention, and he argued against the idea that “there will always be some level of defectives.” The quality-is-free concept presented in his book, Quality Is Free, is that the costs of poor quality are much greater than traditionally defined. According to Crosby, these costs are so great that rather than viewing quality efforts as costs, organizations should view them as a way to reduce costs, because the improvements gener- ated by quality efforts will more than pay for themselves.

Crosby believes that any level of defects is too high and that achieving quality can be rela- tively easy, as explained in his book Quality Without Tears: The Art of Hassle-Free Management.

Kaoru Ishikawa. The late Japanese expert on quality was strongly influenced by both Deming and Juran, although he made significant contributions of his own to quality management. Among his key contributions were the development of the cause-and-effect diagram (also known as a fishbone diagram) for problem solving and the implementation of quality circles, which involve workers in quality improvement. He was the first quality expert to call attention to the internal customer —the next person in the process, the next operation, within the organization.

Genichi Taguchi. Taguchi is best known for the Taguchi loss function, which involves a formula for determining the cost of poor quality. The idea is that the deviation of a part from a standard causes a loss, and the combined effect of deviations of all parts from their standards can be large, even though each individual deviation is small. An important part of his philoso- phy is the cost to society of poor quality.

Taiichi Ohno and Shigeo Shingo. Taiichi Ohno and Shigeo Shingo both developed the philosophy and methods of kaizen, a Japanese term for continuous improvement (defined more fully later in this chapter), at Toyota. Continuous improvement is one of the hallmarks of successful quality management.

Table 9.2 provides a summary of the important contributions of the gurus to modern quality management.

Contributor Key Contributions

Shewhart Control charts; variance reduction Deming 14 points; special versus common causes of variation Juran Quality is fitness-for-use; quality trilogy Feigenbaum Quality is a total field; the customer defines quality Crosby Quality is free; zero defects Ishikawa Cause-and-effect diagrams; quality circles Taguchi Taguchi loss function Ohno and Shingo Continuous improvement

TABLE 9.2 A summary of key contributors to quality management

ste24102_ch09_366-409.indd 371ste24102_ch09_366-409.indd 371 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

372 Chapter Nine Management of Quality

9.4 INSIGHTS ON QUALITY MANAGEMENT Successful management of quality requires that managers have insights on various aspects of quality. These include defining quality in operational terms, understanding the costs and benefits of quality, recognizing the consequences of poor quality, and recognizing the need for ethical behavior. We begin with defining quality.

Defining Quality: The Dimensions of Quality One way to think about quality is the degree to which performance of a product or service meets or exceeds customer expectations. The difference between these two, that is Perfor- mance – Expectations, is of great interest. If these two measures are equal, the difference is zero, and expectations have been met. If the difference is negative, expectations have not been met, whereas if the difference is positive, performance has exceeded customer expectations.

Customer expectations can be broken down into a number of categories, or dimensions, that customers use to judge the quality of a product or service. Understanding these helps organizations in their efforts to meet or exceed customer expectations. The dimensions used for goods are somewhat different from those used for services.

Product Quality. Product quality is often judged on nine dimensions of quality: 1

Performance —main characteristics of the product.

Aesthetics —appearance, feel, smell, taste.

Special features —extra characteristics.

Conformance —how well a product corresponds to design specifications.

Reliability —dependable performance.

Durability —ability to perform over time.

Perceived quality —indirect evaluation of quality (e.g., reputation).

Serviceability —handling of complaints or repairs.

Consistency —quality doesn’t vary.

These dimensions are further described by the examples presented in Table  9.3 . When referring to a product, a customer sometimes judges the first four dimensions by its fitness for use.

Notice that price is not a dimension of quality.

1 Adapted from David Garvin, “Competing on the Eight Dimensions of Quality,” Harvard Business Review 65, no. 6 (1987). Copyright © 1987 by the Harvard Business School Publishing Corporation; all rights reserved.

LO9.2 Define the term quality as it relates to products and as it relates to services.

Dimension Examples

1. Performance Everything works: fit and finish, ride, handling, acceleration 2. Aesthetics Exterior and interior design 3. Features Convenience: placement of gauges High tech: GPS system Safety: anti-skid, airbags 4. Conformance Car matches manufacturer’s specifications 5. Reliability Infrequent need for repairs 6. Durability Useful life in miles, resistance to rust 7. Perceived quality Top-rated 8. Serviceability Ease of repair 9. Consistency Quality doesn’t vary from car to car

TABLE 9.3 Examples of product quality dimensions for a car

ste24102_ch09_366-409.indd 372ste24102_ch09_366-409.indd 372 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 373

Service Quality. The dimensions of product quality don’t adequately describe service qual- ity. Instead, service quality is often described using the following dimensions: 2

Convenience —the availability and accessibility of the service.

Reliability —the ability to perform a service dependably, consistently, and accurately.

Responsiveness —the willingness of service providers to help customers in unusual situ- ations and to deal with problems.

Time —the speed with which service is delivered.

Assurance —the knowledge exhibited by personnel who come into contact with a cus- tomer and their ability to convey trust and confidence.

Courtesy —the way customers are treated by employees who come into contact with them.

Tangibles —the physical appearance of facilities, equipment, personnel, and communica- tion materials.

Consistency —The ability to provide the same level of good quality repeatedly.

Expectations —Meet (or exceed) customer expectations.

Table 9.4 illustrates how the dimensions of service quality might apply to having an automo- bile repaired.

The dimensions of both product and service quality establish a conceptual framework for thinking about quality, but even they are too abstract to be applied operationally for purposes of product or service design, or actually producing a product or delivering a service. They must be stated in terms of specific, measurable characteristics. For example, when buying a car, a customer would naturally be interested in the car’s performance. But what does that mean? In more specific terms, it might refer to a car’s estimated miles per gallon, how quickly it can go from 0 to 60 miles per hour, or its stopping distance when traveling at 60 mph. Each of these can be stated in measurable terms (e.g., estimated miles per gallon: city  �  25, highway  �  30). Similar measurable characteristics can often be identified for each of the other product dimen- sions, as well as for the service dimensions. This is the sort of detailed information that is needed to both design and produce high-quality goods and services.

Information on customer wants in service can sometimes be difficult to pin down, creating challenges for designing and managing service quality. For example, customers may use words such as friendly, considerate, and professional to describe what they expect from service provid- ers. These and similar descriptors are often difficult to translate into exact service specifications. Moreover in many instances, customer wants are often industry specific. Thus, the expectations would be quite different for health care versus dry cleaning. Furthermore, customer complaints may be due in part to unrelated factors (e.g., customer’s mood or general health, the weather).

2 Adapted from Valerie A. Zeithhaml, A. Parasuraman, and Leonard L. Berry, Delivering Quality Service and Balancing Customer Expectations (New York: The Free Press, 1990); and J. R. Evans and W. M. Lindsey, The Man- agement and Control of Quality, 3rd ed. (St. Paul, MN: West Publishing, 1996).

Dimension Examples

1. Convenience Was the service center conveniently located? 2. Reliability Was the problem fixed and will the “fix” last? 3. Responsiveness Were customer service personnel willing and able to answer questions? 4. Time How long did the customer have to wait? 5. Assurance Did the customer service personnel seem knowledgeable about the repair? 6. Courtesy Were customer service personnel and the cashier friendly and courteous? 7. Tangibles Were the facilities clean? Were personnel neat? 8. Consistency Was the service quality good, and was it consistent with previous visits? 9. Expectations Were customer expectations met?

TABLE 9.4 Examples of service quality dimensions for having a car repaired

ste24102_ch09_366-409.indd 373ste24102_ch09_366-409.indd 373 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

374 Chapter Nine Management of Quality

Other challenges with service quality include the reality that customer expectations often change over time and that different customers tend to have different expectations, so what one customer might view as good service quality, another customer might not be satisfied with at all. Couple these with the fact that each contact with a customer is a “moment of truth” in which service quality is instantly judged, and you begin to understand some of the challenges of achieving a consistently high perception of service quality.

If customers participate in a service system (i.e., self-service), there can be increased potential for a negative perception of quality. Consequently, adequate care must be taken to make the necessary customer acts simple and safe, especially since customers cannot be trained. So error prevention must be designed into the system.

It should also be noted that in most instances, some quality dimensions of a product or service will be more important than others, so it is important to identify customer priorities, especially when it is likely that trade-off decisions will be made at various points in design and production. Quality function deployment (described in Chapter 4) is a tool that can be helpful for that purpose.

Assessing Service Quality A widely used tool for assessing service quality is SERVQUAL, 3 an instrument designed to obtain feedback on an organization’s ability to provide quality service to customers. It focuses on five of the above-mentioned service dimensions that influence customers’ perceptions of service quality: tangibles, reliability, responsiveness, assurance, and empathy. The results of this service quality audit help management identify service strengths and weaknesses. Of par- ticular interest are any gaps or discrepancies in service quality. There may be discrepancies between:

1. actual customer expectations and management perceptions of those expectations.

2. management perceptions of customer expectations and service-quality specifications.

3. service quality and service actually delivered.

4. service actually delivered and what is communicated about the service to customers.

5. customers’ expectations of the service provider and their perceptions of provider delivery.

If gaps are found, they can be related to tangibles or other service quality dimensions to address the discrepancies.

3 Valarie A. Zeithaml, A. Parasuraman, and Leonard L. Berry, Delivering Quality Service: Balancing Customer Perceptions and Expectations (New York: The Free Press, 1990), p. 26.

Consumers often associate quiet operation as a sign of product qual- ity, and they are willing to pay extra to get it. Such is the case with clothes washers, dishwashers, air conditioners, shredders, and auto- mobiles. In the case of automobiles, designers know that buyers asso- ciate a quiet ride with quality, so doors, hood, windshield and exhaust systems have extra soundproofing and sealing to keep noise out. They also know that buyers value safety, and that buyers associate safety with how solid a car door sounds when it is closed, so designers have given extra attention to those sorts of details. A sign of the growing

READING The Sounds of Quality

importance of sound in the auto industry is that J.D. Power & Associates measures “pleasantness of sound” for doors, signals, and engine accel- eration in its Initial Quality Study.

Likewise, cell phone manufacturers are giving careful attention to ring tones and other sounds emitted by their products, as are manufac- turers of other electronic gadgets.

Source: Based on David Kiley, “Fine-Tuning a Brand’s Signature Sound,” BusinessWeek, August 13, 2007.

ste24102_ch09_366-409.indd 374ste24102_ch09_366-409.indd 374 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 375

Customers shopping for appliances at an Abt Electronics store in Glenview, Illinois. Abt is an independent, family-owned retailer known for quality products and great customer service.

The Determinants of Quality

The degree to which a product or a service successfully satisfies its intended purpose has four primary determinants:

1. Design.

2. How well the product or service conforms to the design.

3. Ease of use.

4. Service after delivery.

The design phase is the starting point for the level of quality eventually achieved. Design involves decisions about the specific characteristics of a product or service such as size, shape, and location. Quality of design refers to the intention of designers to include or exclude cer- tain features in a product or service. For example, many different models of automobiles are on the market today. They differ in size, appearance, roominess, fuel economy, comfort, and materials used. These differences reflect choices made by designers that determine the qual- ity of design. Design decisions must take into account customer wants, production or service capabilities, safety and liability (both during production and after delivery), costs, and other similar considerations.

Designers may determine customer wants from information provided by marketing, per- haps through the use of consumer surveys or other market research. Marketing may organize focus groups of consumers to express their views on a product or service (what they like and don’t like, and what they would like to have).

Designers must work closely with representatives of operations to ascertain that designs can be produced; that is, that production or service has the equipment, capacity, and skills necessary to produce or provide a particular design.

A poor design can result in difficulties in production or service. For example, materials might be difficult to obtain, specifications difficult to meet, or procedures difficult to follow. Moreover, if a design is inadequate or inappropriate for the circumstances, the best workman- ship in the world may not be enough to achieve the desired quality. Also, we cannot expect a worker to achieve good results if the given tools or procedures are inadequate. Similarly, a superior design usually cannot offset poor workmanship.

Quality of conformance refers to the degree to which goods and services conform to (i.e., achieve ) the intent of the designers. This is affected by factors such as the capability of

LO9.3 Identify the determi- nants of quality.

Quality of design  Intention of designers to include or exclude features in a product or service.

Quality of conformance  The degree to which goods or ser- vices conform to the intent of the designers.

ste24102_ch09_366-409.indd 375ste24102_ch09_366-409.indd 375 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

376 Chapter Nine Management of Quality

equipment used; the skills, training, and motivation of workers; the extent to which the design lends itself to production; the monitoring process to assess conformance; and the taking of cor- rective action (e.g., through problem solving) when necessary. One important key to quality is reducing the variability in process outputs (i.e., reducing the degree to which individual items or individual service acts vary from one another). This will be discussed in detail in Chapter 10.

The determination of quality does not stop once the product or service has been sold or delivered. Ease of use and user instructions are important. They increase the chances, but do not guarantee, that a product will be used for its intended purposes and in such a way that it will continue to function properly and safely. (When faced with liability litigation, companies often argue that injuries and damages occurred because the user misused the product.) Much of the same reasoning can be applied to services. Customers, patients, clients, or other users must be clearly informed on what they should or should not do; otherwise, there is the dan- ger that they will take some action that will adversely affect quality. Some examples include the doctor who fails to specify that a medication should be taken before meals and not with orange juice and the attorney who neglects to inform a client of a deadline for filing a claim.

Much consumer education takes the form of printed instructions and labeling. Thus, man- ufacturers must ensure that directions for unpacking, assembling, using, maintaining, and adjusting the product—and what to do if something goes wrong (e.g., flush eyes with water, call a physician, induce vomiting, do not induce vomiting, disconnect set immediately)—are clearly visible and easily understood.

For a variety of reasons, products do not always perform as expected, and services do not always yield the desired results. Whatever the reason, it is important from a quality standpoint to remedy the situation—through recall and repair of the product, adjustment, replacement or buyback, or reevaluation of a service—and do whatever is necessary to bring the product or service up to standard.

Responsibility for Quality It is true that all members of an organization have some responsibility for quality, but certain parts of the organization are key areas of responsibility:

Top management. Top management has the ultimate responsibility for quality. While establishing strategies for quality, top management must institute programs to improve quality; guide, direct, and motivate managers and workers; and set an example by being involved in quality initiatives. Examples include taking training in quality, issuing peri- odic reports on quality, and attending meetings on quality.

Design. Quality products and services begin with design. This includes not only features of the product or service; it also includes attention to the processes that will be required to produce the products and/or the services that will be required to deliver the service to customers.

Procurement. The procurement department has responsibility for obtaining goods and services that will not detract from the quality of the organization’s goods and services.

Production/operations. Production/operations has responsibility to ensure that pro- cesses yield products and services that conform to design specifications. Monitoring pro- cesses and finding and correcting root causes of problems are important aspects of this responsibility.

Quality assurance. Quality assurance is responsible for gathering and analyzing data on problems and working with operations to solve problems.

Packaging and shipping. This department must ensure that goods are not damaged in transit, that packages are clearly labeled, that instructions are included, that all parts are included, and that shipping occurs in a timely manner.

Marketing and sales. This department has the responsibility to determine customer needs and to communicate them to appropriate areas of the organization. In addition, it has the responsibility to report any problems with products or services.

ste24102_ch09_366-409.indd 376ste24102_ch09_366-409.indd 376 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 377

Customer service. Customer service is often the first department to learn of problems. It has the responsibility to communicate that information to appropriate departments, deal in a reasonable manner with customers, work to resolve problems, and follow up to confirm that the situation has been effectively remedied.

Poor quality increases certain costs incurred by the organization. The following section provides further detail on costs associated with quality.

Benefits of Good Quality Business organizations with good or excellent quality typically benefit in a variety of ways: an enhanced reputation for quality, the ability to command premium prices, an increased mar- ket share, greater customer loyalty, lower liability costs, and fewer production or service problems—which yields higher productivity, fewer complaints from customers, lower pro- duction costs, and higher profits. Annual studies by the National Institute of Standards indi- cate that winners of the Baldrige quality award, described later in the chapter, outperform the S&P 500 Index by a significant amount. 4

The Consequences of Poor Quality It is important for management to recognize the different ways in which the quality of a firm’s products or services can affect the organization and to take these into account in developing and maintaining a quality assurance program. Some of the major areas affected by quality are

1. Loss of business.

2. Liability.

3. Productivity.

4. Costs.

Poor designs or defective products or services can result in loss of business. Failure to devote adequate attention to quality can damage a profit-oriented organization’s reputation and lead to a decreased share of the market, or it can lead to increased criticism and/or con- trols for a government agency or nonprofit organization.

In the retail sector, managers might not be fully aware of poor product or service quality because customers do not always report their dissatisfaction. Even so, dissatisfied customers do tend to voice their dissatisfaction to friends and relatives, which can have negative implica- tions for customer perceptions and future business.

Organizations must pay special attention to their potential liability due to damages or inju- ries resulting from either faulty design or poor workmanship. This applies to both products and services. Thus, a poorly designed steering arm on a car might cause the driver to lose control of the car, but so could improper assembly of the steering arm. However, the net result is the same. Similarly, a tree surgeon might be called to cable a tree limb. If the limb later falls and causes damage to a neighbor’s car, the accident might be traced to a poorly designed procedure for cabling or to improper workmanship. Liability for poor quality has been well established in the courts. An organization’s liability costs can often be substantial, especially if large numbers of items are involved, as in the automobile industry, or if potentially wide- spread injury or damage is involved (e.g., an accident at a nuclear power plant). Express written warranties as well as implied warranties generally guarantee the product as safe when used as intended. The courts have tended to extend this to foreseeable uses, even if these uses were not intended by the producer. In the health care field, medical malpractice claims and insurance costs are contributing to skyrocketing costs and have become a major issue nation- wide. It’s been estimated that medical mistakes result in about 98,000 deaths annually in the United States. Surprisingly, this number has remained fairly steady for more than a few years. If medical errors were classified as a disease, they would rank about sixth on the list of major causes of death.

4 “‘Baldrige Index’ Outperforms S&P 500 by Almost 5 to 1,” press release, available at www.quality.nist.gov .

LO9.4 Explain why quality is important and the conse- quences of poor quality.

ste24102_ch09_366-409.indd 377ste24102_ch09_366-409.indd 377 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

378 Chapter Nine Management of Quality

Productivity and quality are often closely related. Poor quality can adversely affect produc- tivity during the manufacturing process if parts are defective and have to be reworked or if an assembler has to try a number of parts before finding one that fits properly. Also, poor quality in tools and equipment can lead to injuries and defective output, which must be reworked or scrapped, thereby reducing the amount of usable output for a given amount of input. Simi- larly, poor service can mean having to redo the service and reduce service productivity.

Cost to remedy a problem is a major consideration in quality management. The earlier a problem is identified in the process, the cheaper the cost to fix it. The cost to fix a problem at the customer end has been estimated at about five times the cost to fix a problem at the design or production stages.

The Costs of Quality Any serious attempt to deal with quality issues must take into account the costs associated with quality. Those costs can be classified into three categories: appraisal, prevention, and failure.

Appraisal costs relate to inspection, testing, and other activities intended to uncover defec- tive products or services, or to assure that there are none. They include the cost of inspectors, testing, test equipment, labs, quality audits, and field testing.

Appraisal costs  Costs of activ- ities designed to ensure quality or uncover defects.

A Team with Teeth Hyundai’s focus on quality comes straight from the top. Since 1999, Chairman Chung has boosted the quality team to 865 workers from 100, and virtually all employees have had to attend special seminars on improving Hyundai’s cars. Chung presides over twice-monthly quality meetings in a special conference room and an adjacent workshop, with vehicle lifts and high-intensity spotlights for comparing Hyundais head-to-head with rivals. And this team has teeth: In the past year, the introduction of three new models was delayed by months as engineers scrambled to boost quality in response to prob- lems found by the team.

The focus is on the details. In 1998, for instance, customers reported faulty warning lights and difficulty starting engines. So Chung set up a $30 million computer center where 71 engineers simulate harsh con- ditions to test electronics and pinpoint defects. The result: In Power’s 2004 initial quality survey, Hyundai had only 9.6 problems in these areas per 100 vehicles, vs. an industry average of 13.8. Three years ago Hyundai had 23.4 problems, vs. the industry’s 17.9. “This is not a shotgun approach,” says Robert Cosmai, president of the company’s U.S. affiliate, Hyundai Motor America.

The big test comes next year when Hyundai is due to begin building redesigned Santa Fes and Sonatas in Alabama. One encouraging sign: DaimlerChrysler and Mitsubishi Motors Corp. plan to use a Hyundai- designed four-cylinder engine in their own small and midsize cars. “This is a vote of confidence for Hyundai’s engine quality,” says Ahn Soo Woong, an auto analyst at Han-wha Securities Co. Now it’s up to consumers to decide whether Hyundai really makes the grade.

Source: “Hyundai: Kissing Clunkers Goodbye,” BusinessWeek, May 17, 2004. Copyright © 2004 The McGraw-Hill Companies, Inc. Used with permission.

Moon Ihlwan , with Larry Armstrong and Michael Eidam When Hyundai Motor Co. Chairman Chung Mong Koo said his company could increase the quality of its cars to “Toyota levels” five years ago, few took him seriously. After all, Hyundai was the butt of talk-show jokes and a target of industry disdain for tinny cars that were about as reliable as a go-kart. So when J. D. Power & Associates Inc. on April 28 said the Korean carmaker had virtually caught up with Toyota in terms of quality, jaws dropped from Detroit to Tokyo. “We still have a long way to go,” says Suh Byung Kee, the senior executive vice-president head- ing Hyundai’s quality-control team. “But we have completed the first phase of our task.”

The second phase could well be tougher. The eye-opening survey measured initial quality—the number of complaints customers had in the first 90 days of ownership. Hyundai owners reported just 102 prob- lems per 100 cars sold—earning a tie with Honda as the second-best carmaker on the list and falling just below Toyota’s tally of 101. And its Sonata sedan was the top-ranked car in the “entry mid-sized” cat- egory. On longer-term measures, though, Hyundai remains a laggard: In Power’s July, 2003, Vehicle Dependability Study, Hyundai tallied 342 problems per 100 vehicles after three years of ownership, vs. an indus- try average of 273. Hyundai execs counter that it will take time before the recent improvement shows up in the longer-term statistics.

There’s reason to agree with Hyundai’s optimism. First wooed by the company’s generous warranty—10 years for the drive train and five years for everything else—U.S. consumers are starting to believe that Hyundai is a changed brand. Last year they bought 400,000 of its cars. . . . Jeff Ball, a pharmacist from Laurence Harbor, N.J., has four of them: He and his wife share a Santa Fe SUV and a Sonata sedan (“I call it my Jaguar without the cat,” he says), and he has bought smaller mod- els for his sons. Sales like that are helping Hyundai’s bottom line. . . .

READING Hyundai: Kissing Clunkers Goodbye

ste24102_ch09_366-409.indd 378ste24102_ch09_366-409.indd 378 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 379

Prevention costs relate to attempts to prevent defects from occurring. They include costs such as planning and administration systems, working with vendors, training, quality control procedures, and extra attention in both the design and production phases to decrease the prob- ability of defective workmanship.

Failure costs are incurred by defective parts or products or by faulty services. Internal failures are those discovered during the production process; external failures are those discovered after delivery to the customer. Internal failures occur for a variety of reasons, including defective material from vendors, incorrect machine settings, faulty equipment, incorrect methods, incorrect processing, carelessness, and faulty or improper material handling procedures. The costs of internal failures include lost production time, scrap and rework, investigation costs, possible equipment damage, and possible employee injury. Rework costs involve the salaries of workers and the additional resources needed to per- form the rework (e.g., equipment, energy, raw materials). Beyond those costs are items such as inspection of reworked parts, disruption of schedules, the added costs of parts and mate- rials in inventory waiting for reworked parts, and the paperwork needed to keep track of the items until they can be reintegrated into the process. External failures are defective products or poor service that go undetected by the producer. Resulting costs include warranty work, handling of complaints, replacements, liability/litigation, payments to customers or dis- counts used to offset the inferior quality, loss of customer goodwill, and opportunity costs related to lost sales.

External failure costs are typically much greater than internal failure costs on a per-unit basis. Table 9.5 summarizes quality costs.

Internal and external failure costs represent costs related to poor quality, whereas appraisal and prevention costs represent investments for achieving good quality.

An important issue in quality management is the value received from expenditures on prevention. There are two schools of thought on this. One is that prevention costs will be outweighed by savings in appraisal and failure costs. This is espoused by such people as Crosby and Juran, discussed in further detail later in this chapter. They believe that as the costs of defect prevention are increased, the costs of appraisal and failure decrease by much more. What this means, if true, is that the net result is lower total costs, and, thus, as Crosby suggests, quality is free. On the other hand, some managers believe that by attempting to go beyond a certain point, such expenditures on quality reduce the funds available for other objectives such as reducing product development times and upgrading technology. The return on quality (ROQ) approach focuses on the economics of quality efforts. In this approach, quality improvement projects are viewed as investments, and, as such, they are evaluated like any other investment, using metrics related to return on investment (ROI).

Prevention costs  Costs of pre- venting defects from occurring.

Failure costs  Costs caused by defective parts or products or by faulty services.

Internal failures  Failures discovered during production.

External failures  Failures discovered after delivery to the customer.

Return on quality  An approach that evaluates the financial return of investments in quality.

Category Description Examples

Appraisal costs Costs related to measuring, evaluating, and auditing materials, parts, products, and services to assess conformance with quality standards

Inspection equipment, testing, labs, inspectors, and the interruption of production to take samples

Prevention costs Costs related to reducing the potential for quality problems

Quality improvement programs, training, monitoring, data collection and analysis, and design costs

Internal failure costs Costs related to defective products or services before they are delivered to customers

Rework costs, problem solving, material and product losses, scrap, and downtime

External failure costs Costs related to delivering substandard products or services to customers

Returned goods, reworking costs, warranty costs, loss of goodwill, liability claims, and penalties

TABLE 9.5 Summary of quality costs

LO9.5 Describe and give examples of the costs asso- ciated with quality.

ste24102_ch09_366-409.indd 379ste24102_ch09_366-409.indd 379 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

380 Chapter Nine Management of Quality

Ethics and Quality Management All members of an organization have an obligation to perform their duties in an ethical man- ner. Ethical behavior comes into play in many situations that involve quality. One major cate- gory is substandard work, including defective products and substandard service, poor designs, shoddy workmanship, and substandard parts and raw materials. Having knowledge of this and failing to correct and report it in a timely manner is unethical and can have a number of nega- tive consequences. These can include increased costs for organizations in terms of decreased productivity, an increase in the accident rate among employees, inconveniences and injuries to customers, and increased liability costs.

A related issue is how an organization chooses to deal with information about quality problems in products that are already in service. For example, automakers and tire makers in recent years have been accused of withholding information about actual or potential qual- ity problems; they failed to issue product recalls, or failed to divulge information, choosing instead to handle any complaints that arose on an individual basis.

9.5 QUALITY AWARDS Quality awards have been established to generate improvement in quality. The Malcolm Bald- rige Award, the European Quality Award, and the Deming Prize are well-known awards given annually to recognize firms that have integrated quality management into their operations.

LO9.6 Discuss the importance of ethics in managing quality.

to a year of backlog that needed to be fixed and repaired,” he relates. “Now we are talking in terms of hours of rework in front of us.”

However positive and dramatic this change, Coburn and his man- agement team also realized that it wouldn’t help much if the scrap and rework inventory piles kept growing, he says, which is where he says the less-tangible “employee engagement” part of the equation comes in.

The first aspect is enabling them to do their jobs. “We’re continu- ing to empower our workers to get real-time data at their fingertips so they’re making good decisions without two-week-old data, or without estimating or just evading what they think the problem is,” he says. Rather than having his workers hanging their heads, Crown Audio’s management team is now in the enviable situation of having different lines and shifts brag about their first-pass yields to each other.

Sustaining this motivated, engaged workforce is itself a team effort, says Coburn, who says that he has learned over the course of Crown Audio’s continuing quality initiative that solidly designed manufactur- ing processes backed up by an engaged and empowered workforce is the essential combination to move any company forward. Quality truly is everyone’s responsibility, and everyone appreciates a job well done.

“There is nothing more frustrating than working hard and then knowing that what you did, did not work out or did not come through.” Coburn stresses this point in no uncertain terms. “Morale is everything in quality,” he says. “People want to do a good job, and we have to enable that.”

Source: Excerpted from Brad Kenney, Industry Week, April 1, 2008.

Larry Coburn, vice president of operations at high-tech audio equipment manufacturer Crown Audio, has seen the need for strong management and employee commitment in his company’s recent quality improve- ments. The market in his industry was driving the development of more complex products that need to be produced more cheaply, and these twin trends put so much pressure on his manufacturing operations that things were breaking down. Their first-pass yields had gotten so bad that their rework inventory had piled up, and even became a major line item on the balance sheet.

“We had areas that were designated for rework that were so large that they were getting on our inventory control list because they were major entities in terms of dollars in inventory,” he recounts. In fact, the problem was large enough to conceal what Coburn and his team call ‘hidden factories’—millions of dollars of untapped production and sales potential existing within their production line. “We started analyz- ing these hidden factories and we actually identified $4 million of cost related to poor quality,” Coburn says.

To stem the tide of red ink, Crown Audio embarked on a drastic plant-floor triage process that involved stopping production entirely, so as not to generate any more rework. They then analyzed and tested the defective inventory, broke the components up into groups based on the common problems they exhibited, and used those groupings to analyze potential process improvements and defect reduction strategies before plugging them back through the process. Once they finished, they not only had saleable inventory to get out the door, but also had a pretty good handle on the parts of their process that needed changing, says Coburn. “When we started, we had months and sometimes close

READING Rework and Morale

d ms

ste24102_ch09_366-409.indd 380ste24102_ch09_366-409.indd 380 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 381

The Baldrige Award Named after the late Malcolm Baldrige, an industrialist and former secretary of commerce, the annual Baldrige Award is administered by the National Institute of Standards and Tech- nology. The purpose of the award competition is to stimulate efforts to improve quality, to recognize quality achievements, and to publicize successful programs.

When the award was first presented in 1988, the award categories were manufacturing and small business. A few years later a service category was added, and then categories for education and health care were added a few years after that. The earliest winners included Motorola, Globe Metallurgical, Xerox Corporation, and Milliken & Company. Since then, many companies have been added to the list. For a complete listing of current and former win- ners, go to www.quality.nist.gov/Award_Recipients.htm .

Applicants are evaluated in seven main areas: leadership, information and analysis, stra- tegic planning, human resource management, customer and market focus, process manage- ment, and business results.

Examiners check the extent to which top management incorporates quality values in daily management; whether products or services are at least as good as those of competitors; whether employees receive training in quality techniques; if the business works with suppliers to improve quality; and if customers are satisfied. Even organizations that don’t win benefit from applying for the award: All applicants receive a written summary of the strengths and weaknesses of their quality management and suggestions for improvement.

Most states have quality award programs based on the Baldrige criteria. These award pro- grams can serve as an entry point for organizations that want to eventually apply for the national award.

For more information, visit www.quality.nist.gov .

The European Quality Award The European Quality Award is Europe’s most prestigious award for organizational excel- lence. The European Quality Award sits at the top of regional and national quality awards, and applicants have often won one or more of those awards prior to applying for the European Quality Award.

The Deming Prize The Deming Prize, named in honor of the late W. Edwards Deming, is Japan’s highly coveted award recognizing successful quality efforts. It is given annually to any company that meets the award’s standards. Although typically given to Japanese firms, in 1989, Florida Power and Light became the first U.S. company to win the award.

The major focus of the judging is on statistical quality control, making it much narrower in scope than the Baldrige Award, which focuses more on customer satisfaction. Companies that win the Deming Prize tend to have quality programs that are detailed and well-communicated throughout the company. Their quality improvement programs also reflect the involvement of senior management and employees, customer satisfaction, and training.

9.6 QUALITY CERTIFICATION Many firms that do business internationally recognize the importance of quality certification.

ISO 9000, 14000, and 24700 The International Organization for Standardization (ISO) promotes worldwide standards for the improvement of quality, productivity, and operating efficiency through a series of stan- dards and guidelines. Used by industrial and business organizations, regulatory agencies, gov- ernments, and trade organizations, the standards have important economic and social bene fits. Not only are they tremendously important for designers, manufacturers, suppliers, ser- vice providers, and customers, but the standards make a tremendous contribution to society

Baldrige Award  Annual award given by the U.S. government to recognize quality achievements of U.S. companies.

LO9.7 Compare the quality awards.

European Quality Award  European award for organizational excellence.

LO9.8 Discuss quality certifi- cation and its importance.

ste24102_ch09_366-409.indd 381ste24102_ch09_366-409.indd 381 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

382 Chapter Nine Management of Quality

in general: They increase the levels of quality and reliability, productivity, and safety, while making products and services affordable. The standards help facilitate international trade. They provide governments with a basis for health, safety, and environmental legislation. And they aid in transferring technology to developing countries.

Two of the most well-known of these are ISO 9000 and ISO 14000. ISO 9000 pertains to quality management. It concerns what an organization does to ensure that its products or services conform to its customers’ requirements. ISO 14000 concerns what an organization does to minimize harmful effects to the environment caused by its operations. Both ISO 9000 and ISO 14000 relate to an organization’s processes rather than its products and services, and both stress continual improvement. Moreover, the standards are meant to be generic; no mat- ter what the organization’s business, if it wants to establish a quality management system or an environmental management system, the system must have the essential elements contained in ISO 9000 or in ISO 14000. The ISO 9000 standards are critical for companies doing busi- ness internationally, particularly in Europe. They must go through a process that involves documenting quality procedures and on-site assessment. The process often takes 12 to 18 months. With certification comes registration in an ISO directory that companies seeking sup- pliers can refer to for a list of certified companies. They are generally given preference over unregistered companies. More than 40,000 companies are registered worldwide; three-fourths of them are located in Europe.

A key requirement for registration is that a company review, refine, and map functions such as process control, inspection, purchasing, training, packaging, and delivery. Similar to the Baldrige Award, the review process involves considerable self-appraisal, resulting in prob- lem identification and improvement. Unlike the Baldrige Award, registered companies face an ongoing series of audits, and they must be reregistered every three years.

In addition to the obvious benefits of certification for companies that want to deal with the European Union, the ISO 9000 certification and registration process is particularly helpful for companies that do not currently have a quality management system; it provides guidelines for establishing the system and making it effective.

Eight quality management principles form the basis of the latest version of ISO 9000:

1. A customer focus.

2. Leadership.

3. Involvement of people.

4. A process approach.

5. A system approach to management.

6. Continual improvement.

7. Use of a factual approach to decision making.

8. Mutually beneficial supplier relationships.

The standards for ISO 14000 certification bear upon three major areas:

Management systems —systems development and integration of environmental respon- sibilities into business planning.

Operations —consumption of natural resources and energy.

Environmental systems —measuring, assessing, and managing emissions, effluents, and other waste streams.

ISO 24700 pertains to the quality and performance of office equipment that contains reused components. ISO/IEC 24700 specifies product characteristics for use in an original equipment manufacturer’s or authorized third-party’s declaration of conformity to demon- strate that a marketed product that contains reused components performs equivalent to new, meeting equivalent-to-new component specifications and performance criteria, and continues to meet all the safety and environmental criteria required by responsibly built products. It is relevant to marketed products whose manufacturing and recovery processes result in the reuse of components.

ISO 9000  A set of international standards on quality manage- ment and quality assurance, criti- cal to international business.

ISO 14000  A set of interna- tional standards for assessing a company’s environmental performance.

ISO 24700  A set of interna- tional standards that pertains to the quality and performance of office equipment that contains reused components.

ste24102_ch09_366-409.indd 382ste24102_ch09_366-409.indd 382 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 383

If you’d like to learn more about ISO standards, visit the International Organization for Standardization Web site at www.ISO.org/ISO/en/ISOonline.frontpage or the American Soci- ety for Quality Web site at www.asq.org .

9.7 QUALITY AND THE SUPPLY CHAIN Business leaders are increasingly recognizing the importance of their supply chains in achiev- ing their quality goals. Achievement requires measuring customer perceptions of quality, identifying problem areas, and correcting those problems.

When dealing with supplier quality in global supply chains, companies are finding a wide range in the degree of sophistication concerning quality assurance. Although developed coun- tries often have a fair level of sophistication, little or no awareness of modern quality practices may be found in some less-developed countries. This poses important liability issues for com- panies that outsource to those areas.

An interesting situation is outsourcing in the pharmaceutical industry. Offshore suppliers offer low prices that domestic producers can’t match. However, the cost advantage of off- shore producers is not based solely on lower labor costs; a significant “advantage” is the fact that domestic producers undergo strict and costly government quality regulations and unan- nounced inspections that offshore producers are not subject to. While this lowers the costs to importers, it also increases their liability risks.

Increasingly, the emphasis in supply chain quality management is on reducing outsourcing risk as well as product or service variation and overhead. Risk comes from the use of sub- standard materials or work methods, which can lead to inferior product quality and potential product liability. Tighter control of vendors and worker training can reduce these risks. Varia- tion results from processes that are not in control; it can be reduced through statistical quality

The acting chair of the Consumer Product Safety Commission spoke at a press conference on a recall of Mattel Inc. toys manufactured in China. Mattel recalled 18.6 million products around the world because they contained magnets that could fall out and be swallowed by children.

ste24102_ch09_366-409.indd 383ste24102_ch09_366-409.indd 383 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

384 Chapter Nine Management of Quality

control. Overhead can be reduced by assigning quality assurance responsibility to vendors, while customers operate in a quality audit mode, with some monitoring of vendor quality efforts.

Supply chain quality management can benefit from a collaborative relationship with sup- pliers that includes helping suppliers with quality assurance efforts as well as information sharing on quality-related matters. Ideally, improving supply chain quality can become part of an organization’s continuous improvement efforts.

The following reading offers some guidelines for improving quality and reducing out- sourcing risk.

9.8 TOTAL QUALITY MANAGEMENT A primary role of management is to lead an organization in its daily operation and to maintain it as a viable entity into the future. Quality has become an important factor in both of these objectives.

Although ostensibly always an objective of business, customer satisfaction, in customer terms, became a specific goal in the late 1980s. Providing high quality was recognized as a key element for success. Most large corporations taking that path have documented their suc- cess. First, they survived the strong overseas competition that had set the high quality levels and now have regained some of their former markets. Smaller companies are also adopting similar goals.

Management plays a critical role in TQM. The approach is reflected in an operating phi- losophy. For example, among the 14 Toyota Way Principles is:

Principle 1. Base your management decisions on a long-term philosophy, even at the expense of short-term financial goals. . . . Generate value for the customer, society, and the economy; it is your starting point. Evaluate every function in the company in terms of its ability to achieve this. 5

5 From Jeffrey K. Liker, The Toyota Way (New York: McGraw-Hill, 2004).

6. Be cautious of buying from companies that do not have franchised relationships with distribution partners to avoid a greater potential risk of counterfeit product.

7. Beware of unusually low pricing. 8. Look for International Organization for Standardization (ISO) or

other equivalent, globally recognized certifications in a supply chain partner’s operations.

9. Establish relationships with third-party organizations. 10. Translate quality into measurable and clearly defined targets with

supply chain partners and ensure these metrics are communicated regularly with employees.

As the Supply Chain Digest notes, to do this right will involve greater costs, reducing the relative price advantage of offshore strategies to a degree, and certainly requiring companies to build a substantial infra- structure to develop and maintain these monitoring programs.

Source: Excerpted from “Improving Quality and Reducing Risk in Offshoring,” Supply Chain Digest, August 7, 2007. Copyright © 2007 SCDigest. Used with permission.

William E. Mitchell, chairman, president and CEO of Arrow Elec- tronics, offered 10 guidelines on how to reduce product quality and related risks in an offshore supply chain. The guidelines were nominally targeted at electronics suppliers, but offer a good starting point for many companies looking to reduce risk and potential quality problems.

1. Source from reputable, well-established companies with tight internal controls.

2. Conduct comprehensive background checks, including checking trade references and past business history, of supply chain part- ners before conducting business with them.

3. Implement site inspections of supply chain partners and find out what systems have been put in place to track quality.

4. Conduct ongoing performance reviews of supply chain partners and engage in ongoing communications with them to benchmark against preset goals and define improvement plans.

5. Only source from companies that are willing to provide a guarantee for products in writing.

READING Improving Quality and Reducing Risk in Offshoring

LO9.9 Describe TQM.

ste24102_ch09_366-409.indd 384ste24102_ch09_366-409.indd 384 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 385

The term total quality management (TQM) refers to a quest for quality in an organiza- tion. There are three key philosophies in this approach. One is a never-ending push to improve, which is referred to as continuous improvement; the second is the involvement of everyone in the organization; and the third is a goal of customer satisfaction, which means meeting or exceeding customer expectations. TQM expands the traditional view of quality—looking only at the quality of the final product or services—to looking at the quality of every aspect of the process that produces the product or service. TQM systems are intended to prevent poor quality from occurring.

We can describe the TQM approach as follows:

1. Find out what customers want. This might involve the use of surveys, focus groups, interviews, or some other technique that integrates the customer’s voice in the decision- making process. Be sure to include the internal customer (the next person in the pro- cess) as well as the external customer (the final customer).

Total quality management (TQM)  A philosophy that involves everyone in an orga- nization in a continual effort to improve quality and achieve cus- tomer satisfaction.

Sign on the wall of a company cafeteria: Sometimes they can be cranky, and it may sometimes seem like they expect too much, but they do provide our paychecks and our benefits, such as sick leave, maternity leave, health insurance, and three weeks of paid vacation time each year. And what about all the new equipment we’ve been getting lately? They pay for that, too. And a lot more. So the next time you see them, give them a great big smile to show how much you appreci- ate them—our customers!

2. Design a product or service that will meet (or exceed) what customers want. Make it easy to use and easy to produce.

3. Design processes that facilitate doing the job right the first time. Determine where mis- takes are likely to occur and try to prevent them. When mistakes do occur, find out why so that they are less likely to occur again. Strive to make the process “mistake-proof.” This is sometimes referred to as a fail-safing : Elements are incorporated in product or service design that make it virtually impossible for an employee (or sometimes a customer) to do something incorrectly. The Japanese term for this is pokayoke. Examples include parts that fit together one way only and appliance plugs that can be inserted into a wall outlet the correct way only. Another term that is sometimes used is foolproofing, but use of this term may be taken to imply that employees (or customers) are fools—not a wise choice!

4. Keep track of results, and use them to guide improvement in the system. Never stop try- ing to improve.

5. Extend these concepts throughout the supply chain.

6. Top management must be involved and committed. Otherwise, TQM will just be another fad that fails and fades away.

Many companies have successfully implemented TQM programs. Successful TQM pro- grams are built through the dedication and combined efforts of everyone in the organization.

The preceding description provides a good idea of what TQM is all about, but it doesn’t tell the whole story. A number of other elements of TQM are important:

1. Continuous improvement. The philosophy that seeks to improve all factors related to the process of converting inputs into outputs on an ongoing basis is called continuous improvement . It covers equipment, methods, materials, and people. Under continuous improvement, the old adage “If it ain’t broke, don’t fix it” gets transformed into “Just because it isn’t broke doesn’t mean it can’t be improved.”

The concept of continuous improvement was not new, but it did not receive much interest in the United States for a while, even though it originated here. However, many Japanese companies used it for years, and it became a cornerstone of the Japanese approach to production. The Japanese use the term kaizen to refer to continuous improvement. The successes of Japanese companies caused other companies to reexamine many of their approaches. This resulted in a strong interest in the continuous improvement approach.

Fail-safing  Incorporating design elements that prevent incorrect procedures.

Continuous improvement   Philosophy that seeks to make never-ending improvements to the process of converting inputs into outputs.

Kaizen  Japanese term for con- tinuous improvement.

ste24102_ch09_366-409.indd 385ste24102_ch09_366-409.indd 385 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

386 Chapter Nine Management of Quality

2. Competitive benchmarking. This involves identifying other organizations that are the best at something and studying how they do it to learn how to improve your operation. The company need not be in the same line of business. For example, Xerox used the mail-order company L.L. Bean to benchmark order filling.

3. Employee empowerment. Giving workers the responsibility for improvements and the authority to make changes to accomplish them provides strong motivation for employees. This puts deci- sion making into the hands of those who are closest to the job and have considerable insight into problems and solutions.

4. Team approach. The use of teams for problem solving and to achieve consensus takes advantage of group synergy, gets people involved, and promotes a spirit of cooperation and shared values among employees.

5. Decisions based on facts rather than opinions. Management gathers and analyzes data as a basis for decision making.

6. Knowledge of tools. Employees and managers are trained in the use of quality tools.

7. Supplier quality. Suppliers must be included in quality assurance and quality improvement efforts so that their processes are capa- ble of delivering quality parts and materials in a timely manner.

8. Champion. A TQM champion’s job is to promote the value and importance of TQM principles throughout the company.

9. Quality at the source. Quality at the source refers to the philoso- phy of making each worker responsible for the quality of his or her work. The idea is to “Do it right the first time.” Workers are expected to provide goods or services that meet specifications and to find and correct mistakes that occur. In effect, each worker becomes a quality inspector for his or her work. When the work is passed on to the next operation in the process (the internal customer) or, if that step is the last in the process, to the ultimate customer, the worker is “certifying” that it meets quality standards.

This accomplishes a number of things: (a) it places direct responsibility for quality on the person(s) who directly affect

it; (b) it removes the adversarial relationship that often exists between quality control inspectors and production workers; and (c) it motivates workers by giving them control over their work as well as pride in it.

10. Suppliers are partners in the process, and long-term relationships are encouraged. This gives suppliers a vital stake in providing quality goods and services. Suppliers, too, are expected to provide quality at the source, thereby reducing or eliminating the need to inspect deliveries from suppliers.

It would be incorrect to think of TQM as merely a collection of techniques. Rather, TQM reflects a whole new attitude toward quality. It is about the culture of an organization. To truly reap the benefits of TQM, the organization must change its culture.

Table 9.6 illustrates the differences between cultures of a TQM organization and a more traditional organization.

Obstacles to Implementing TQM Companies have had varying success in implementing TQM. Some have been quite successful, but others have struggled. Part of the difficulty may be with the process by which it is implemented rather than with the principles of TQM. Among the factors cited in the literature are the following:

1. Lack of a companywide definition of quality: Efforts aren’t coordinated; people are work- ing at cross-purposes, addressing different issues, and using different measures of success.

Quality at the source  The philosophy of making each worker responsible for the qual- ity of his or her work.

The iPod Shuffle stops playing music when the earphone jack is unplugged. When the earphones are plugged back in, the music resumes right where it left off. This keeps the battery from running down and is an example of mistake proofing.

ste24102_ch09_366-409.indd 386ste24102_ch09_366-409.indd 386 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 387

2. Lack of a strategic plan for change: Without such a plan the chance of success is less- ened and the need to address strategic implications of change is ignored.

3. Lack of a customer focus: Without a customer focus, there is a risk of customer dissatisfaction.

4. Poor intraorganizational communication: The left hand doesn’t know what the right hand is doing; frustration, waste, and confusion ensue.

5. Lack of employee empowerment: Not empowering employees gives the impression of not trusting employees to fix problems, adds red tape, and delays solutions.

6. View of quality as a “quick fix”: Quality needs to be a long-term, continuing effort.

7. Emphasis on short-term financial results: “Duct-tape” solutions often treat symptoms; spend a little now—a lot more later.

8. Inordinate presence of internal politics and “turf” issues: These can sap the energy of an organization and derail the best of ideas.

9. Lack of strong motivation: Managers need to make sure employees are motivated.

10. Lack of time to devote to quality initiatives: Don’t add more work without adding addi- tional resources.

11. Lack of leadership: 6 Managers need to be leaders.

This list of potential problems can serve as a guideline for organizations contemplating implementing TQM or as a checklist for those having trouble implementing it.

Criticisms of TQM TQM programs are touted as a way for companies to improve their competitiveness, which is a very worthwhile objective. Nonetheless, TQM programs are not without criticism. The fol- lowing are some of the major criticisms:

1. Overzealous advocates may pursue TQM programs blindly, focusing attention on qual- ity even though other priorities may be more important (e.g., responding quickly to a competitor’s advances).

2. Programs may not be linked to the strategies of the organization in a meaningful way.

3. Quality-related decisions may not be tied to market performance. For instance, customer satisfaction may be emphasized to the extent that its cost far exceeds any direct or indi- rect benefit of doing so.

6 Excerpt from Gary Salegna and Farzaneh Fazel, “Obstacles to Implementing Quality,” Quality Progress, July 2000, p. 53. Copyright © 2000 American Society for Quality. Reprinted with permission from Quality Progress magazine.

Aspect Traditional TQM

Overall mission Maximize return on investment Meet or exceed customer expectations Objectives Emphasis on short term Balance of long term and short term Management Not always open; sometimes inconsistent

objectives Open; encourages employee input;

consistent objectives Role of manager Issue orders; enforce Coach; remove barriers; build trust Customer

requirements Not highest priority; may be unclear Highest priority; important to identify

and understand Problems Assign blame; punish Identify and resolve Problem solving Not systematic; individuals Systematic; teams Improvement Erratic Continuous Suppliers Adversarial Partners Jobs Narrow, specialized; much individual effort Broad, more general; much team effort Focus Product oriented Process oriented

TABLE 9.6 Comparing the cultures of TQM and traditional organizations

ste24102_ch09_366-409.indd 387ste24102_ch09_366-409.indd 387 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

388 Chapter Nine Management of Quality

4. Failure to carefully plan a program before embarking on it can lead to false starts, employee confusion, and meaningless results.

5. Organizations sometimes pursue continuous improvement (i.e., incremental improve- ment) when dramatic improvement is needed.

6. Quality efforts may not be tied to results.

Note that there is nothing inherently wrong with TQM; the problem is how some individuals or organizations misuse it. Let’s turn our attention to problem solving and process improvement.

9.9 PROBLEM SOLVING AND PROCESS IMPROVEMENT Problem solving is one of the basic procedures of TQM. In order to be successful, problem- solving efforts should follow a standard approach. Table 9.7 describes the basic steps in the TQM problem-solving process.

An important aspect of problem solving in the TQM approach is eliminating the cause so that the problem does not recur. This is why users of the TQM approach often like to think of problems as “opportunities for improvement.”

The Plan-Do-Study-Act Cycle The plan-do-study-act (PDSA) cycle , also referred to as either the Shewhart cycle or the Deming wheel, is the conceptual basis for problem-solving activities. The cycle is illustrated in Figure 9.1 . Representing the process with a circle underscores its continuing nature. There are four basic steps in the cycle:

Plan. Begin by studying the current process. Document that process. Then collect data on the process or problem. Next, analyze the data and develop a plan for improvement. Specify measures for evaluating the plan.

Do. Implement the plan, on a small scale if possible. Document any changes made during this phase. Collect data systematically for evaluation.

Study. Evaluate the data collection during the do phase. Check how closely the results match the original goals of the plan phase.

Act. If the results are successful, standardize the new method and communicate the new method to all people associated with the process. Implement training for the new method. If the results are unsuccessful, revise the plan and repeat the process or cease this project.

Employing this sequence of steps provides a systematic approach to continuous improvement.

LO9.10 Give an overview of problem solving.

Plan-do-study-act (PDSA) cycle  A framework for prob- lem solving and improvement activities.

Step 1 Define the problem and establish an improvement goal. Give problem definition careful consideration; don’t rush through this step because this will serve as the focal point of problem-solving efforts.

Step 2 Develop performance measures and collect data. The solution must be based on facts. Possible tools include check sheet, scatter diagram, histo- gram, run chart, and control chart.

Step 3 Analyze the problem. Possible tools include Pareto chart, cause-and-effect diagram.

Step 4 Generate potential solutions. Methods include brainstorming, interviewing, and surveying.

Step 5 Choose a solution. Identify the criteria for choosing a solution. (Refer to the goal established in Step 1.) Apply criteria to potential solutions and select the best one.

Step 6 Implement the solution. Keep everyone informed.

Step 7 Monitor the solution to see if it accomplishes the goal. If not, modify the solution, or return to Step 1. Possible tools include control chart and run chart.

TABLE 9.7 Basic steps in problem solving

ste24102_ch09_366-409.indd 388ste24102_ch09_366-409.indd 388 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 389

Process improvement is a systematic approach to improving a process. It involves docu- mentation, measurement, and analysis for the purpose of improving the functioning of a process. Typical goals of process improvement include increasing customer satisfaction, achieving higher quality, reducing waste, reducing cost, increasing productivity, and reducing processing time.

Table 9.8 provides an overview of process improvement.

Process improvement  A sys- tematic approach to improving a process.

A. Map the process 1. Collect information about the process; identify each step in the process. For each step, determine: The inputs and outputs. The people involved. The decisions that are made. Document such measures as time, cost, space used, waste, employee morale and any employee

turnover, accidents and/or safety hazards, working conditions, revenues and/or profits, quality, and customer satisfaction, as appropriate.

2. Prepare a flowchart that accurately depicts the process. Make sure that key activities and decisions are represented.

B. Analyze the process 1. Ask these questions about the process: Is the flow logical? Are any steps or activities missing? Are there any duplications? 2. Ask these questions about each step: Could it be eliminated? Does the step add value? Does any waste occur at this step? Could the time be shortened? Could the cost to perform the step be reduced? Could two (or more) steps be combined? C. Redesign the process Using the results of the analysis, redesign the process. Document the improvements; potential measures

include reductions in time, cost, space, waste, employee turnover, accidents, safety hazards, and increases/ improvements in employee morale, working conditions, revenues/profits, quality, and customer satisfaction.

LO9.11 Give an overview of process improvement.

TABLE 9.8 Overview of process improvement

FIGURE 9.1 A. The PDSA cycle B. The PDSA cycle applied to problem solving

Recognize problem

Management Commitment

Form quality improvement

teams

Continuous improvement

Define problem

Ensure permanence

Develop performance

measures

Analyze problem

Implement solution

Evaluate solution

Determine possible causes

PLAN

STUDY

ACT

DO

Plan

Study

Act Do

Source: Figure from Donna Summers, Quality, 2nd ed., p. 67. Copyright © 2000 Prentice Hall, Inc. Reprinted by permission of Pearson Education, Inc., Upper Saddle River, NJ.

ste24102_ch09_366-409.indd 389ste24102_ch09_366-409.indd 389 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

390 Chapter Nine Management of Quality

Six Sigma The term six sigma has several meanings. Statistically, six sigma means having no more than 3.4 defects per million opportunities in any process, product, or service. Conceptually, the term is much broader, referring to a program designed to reduce the occurrence of defects to achieve lower costs and improved customer satisfaction. It is based on the application of certain tools and techniques to selected projects to achieve strategic business results. In the business world, six-sigma programs have become a key way to improve quality, save time, cut costs, and improve customer satisfaction. Six-sigma programs can be employed in design, production, service, inventory management, and delivery. It is important for six-sigma proj- ects to be aligned with organization strategy.

Motorola pioneered the concept of a six-sigma program in the 1980s and actually trade- marked the term. Today, six sigma concepts are widely used by businesses, governments, consultants, and even the military as a business performance methodology.

There are management and technical components of six-sigma programs. The manage- ment component involves providing strong leadership, defining performance metrics, select- ing projects likely to achieve business results, and selecting and training appropriate people. The technical component involves improving process performance, reducing variation, uti- lizing statistical methods, and designing a structured improvement strategy, which involves definition, measurement, analysis, improvement, and control.

For six sigma to succeed in any organization, buy-in at the top is essential. Top management must formulate and communicate the company’s overall objectives and lead the program for a successful deployment. Other key players in six-sigma programs are program champions, “master black belts,” “black belts,” and “green belts.” Champions identify and rank potential projects, help select and evaluate candidates, manage program resources, and serve as advocates for the program. Master black belts have extensive training in statistics and use of quality tools. They are teachers and mentors of black belts. Black belts are project team leaders responsible for implementing process improvement projects. They have typically completed four weeks of six-sigma training and have demonstrated mastery of the subject matter through an exam and successful completion of one or more projects. Green belts are members of project teams.

Black belts play a pivotal role in the success of six-sigma programs. They influence change, facilitate teamwork, provide leadership in applying tools and techniques, and convey knowledge and skills to green belts. Black belt candidates generally have a proven strength in either a technical discipline such as engineering or a business discipline. Candidates also must have strong “people skills” and be able to facilitate change. And they must be proficient in applying continuous improvement and statistical methods and tools. A black belt must under- stand the technical aspects of process improvement as well as the expected business results (time, money, quality improvement).

Six sigma is based on these guiding principles:

1. Reduction of variation is an important goal.

2. The methodology is data driven; it requires valid measurements.

3. Outputs are determined by inputs; focus on modifying and/or controlling inputs to improve outputs.

4. Only a critical few inputs have a significant impact on outputs (the Pareto effect); con- centrate on those.

DMAIC (define-measure-analyze-improve-control) is a formalized problem-solving process of six sigma. It is composed of five steps that can be applied to any process to improve its effectiveness. The steps are:

1. Define: Set the context and objectives for improvement.

2. Measure: Determine the baseline performance and capability of the process.

3. Analyze: Use data and tools to understand the cause-and-effect relationships of the process.

4. Improve: Develop the modifications that lead to a validated improvement in the process.

5. Control: Establish plans and procedures to ensure that improvements are sustained.

Six sigma  A business process for improving quality, reducing costs, and increasing customer satisfaction.

LO9.12 Describe the six sigma methodology.

ste24102_ch09_366-409.indd 390ste24102_ch09_366-409.indd 390 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 391

be there to tackle the projects that present big- ger change management challenges.

More Tools Are Needed According to the Six Sigma practitioners completing the survey, the path to better Six Sigma project results requires equipping practitioners with an expanded set of tools to both tackle more complex projects and improve Belt productivity by getting more non-Belt involvement. This finding is not likely to be a revelation to many of the early pioneers who paved the way to the popularity of Six Sigma. Companies like Motorola, Allied Signal (now merged with Honeywell), and GE, along with other big players, such as DuPont and 3M (among others), have already taken steps to strengthen their Six Sigma Deployments by enhancing the skills of Belts and expanding the tool kit.

At the same time, the survey results indicate there is more work to do in advancing Six Sigma into a robust and sustainable method for transformational change. The top priority appears to be the expansion of the Six Sigma practitioner’s tool kit to break free of the “Catch 22” syndrome. In fact, the integration of Lean principles by numerous Six Sigma users is a big step in the right direction. However, in addition to Lean tools there also appears to be a growing recognition that more tools are needed to deal with the change management aspects of Six Sigma. Ninety percent of the survey respondents rated the need for a structured tool set for engaging “non-Belts” in projects, particularly those with significant behavior change requirements.

The preceding finding is linked to the second most important reason practitioners stated as the cause for Six Sigma projects falling short (i.e., lack of buy-in, cooperation, or ownership by frontline employees and managers). The relationship between these two findings correlates with the anecdotal evidence from more experienced Six Sigma organi- zations about the keys to accelerating results and reducing project cycle times. As they move down the experience curve and tackle larger and more complex change projects, the most successful Six Sigma organi- zations have expanded their tool sets and integrated other improvement disciplines such as Lean seamlessly into deployments.

The Keys to a Better Night’s Sleep Six Sigma practitioners can break free of the “Catch 22” syndrome by designing their deployments to deliver consistent results and sustain consistent executive support. The keys are:

1. Expand the tool set early in deployment with methods to get more non-Belt participation and faster results. The key to avoiding confu- sion or overload is to integrate Lean, Innovation, and other improve- ment methods into the DMAIC framework.

2. Engage senior leaders to go beyond the rubber-stamping of project selections to actually designing the project plan with the Belts. The benefits are a more realistic appraisal of project requirements and deeper understanding of where and how to apply other tool sets to drive bigger and faster results.

Bill Kowalski It may be the most widely acclaimed performance improvement system across the business world, yet Six Sigma is not immune to a paradox common to most large-scale change efforts:

You can’t expect to sustain top executive support without pro- ducing consistent bottom-line results . . . yet consistent results aren’t likely without sustained top executive support.

This conundrum is a key finding from a recent survey of more than 240 Six Sigma practitioners across industries and around the globe. Sponsored by Leap Technologies, the survey was conducted anony- mously over the web through iSixSigma.com , the leading Six Sigma information portal.

The survey gauged perceptions of Six Sigma practitioners on two primary issues:

1. What causes Six Sigma projects to fail to produce desired results? 2. What would most help to improve Six Sigma project results?

We know these are issues keeping practitioners up at night because these same people are under increasingly heavy pressure to produce and sustain bottom-line results from their projects.

The “Catch 22” for Six Sigma Practitioners The most often cited reason for Six Sigma project failure was “lack of sustained executive sponsorship and commitment.” It is clearly evident that there is no substitute for top leadership support to achieve sus- tained Six Sigma success. In close second ranking was “lack of buy-in, cooperation and ownership by frontline managers and employees for implementing and sustaining results on Six Sigma project solutions.” These top two barriers to success create a classic “Catch 22” for Six Sigma practitioners. On the one hand, executive commitment is critical to the funding and mandate Six Sigma practitioners need to challenge the status quo.

On the other hand, sustaining executive support is nearly impossible without consistent delivery of results. Yet this payoff can’t be sustained without active support by those most impacted by Six Sigma solutions . . . frontline managers and employees!

Six Sigma is, with its dedicated Belt infrastructure and standardized DMAIC methodology, a more sophisticated and effective approach than past quality improvement methods. But, if there is a chink to be found in Six Sigma’s armor, it is the issue of non-Belt participation and owner- ship. This problem, however, rarely surfaces in the first 12 to 18 months of a Six Sigma Deployment. In fact, we’ve observed that, initially, many Six Sigma Deployment Leaders experience a false sense of security about results. Why? Because most of the projects taken on by newly trained Black and Green Belts rarely require high levels of frontline sup- port and, for the most part, don’t challenge top management’s ingrained cultural biases.

At the same time, it’s also not uncommon for organizations adopting Six Sigma to “hit the wall” once “low touch” projects are completed. Top management’s appetite for results has been whetted, but the founda- tional support in terms of skills, experience and commitment may not

READING What Keeps Six Sigma Practitioners Up at Night?

(continued )

ste24102_ch09_366-409.indd 391ste24102_ch09_366-409.indd 391 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

392 Chapter Nine Management of Quality

9.10 QUALITY TOOLS There are a number of tools that an organization can use for problem solving and process improvement. This section describes eight of these tools. The tools aid in data collection and interpretation, and provide the basis for decision making.

The first seven tools are often referred to as the seven basic quality tools. Figure 9.2 pro- vides a quick overview of the seven tools.

Flowcharts. A flowchart is a visual representation of a process. As a problem-solving tool, a flowchart can help investigators in identifying possible points in a process where problems occur. Figure 9.3 illustrates a flowchart for catalog telephone orders in which potential failure points are highlighted.

The diamond shapes in the flowchart represent decision points in the process, and the rect- angular shapes represent procedures. The arrows show the direction of “flow” of the steps in the process.

To construct a simple flowchart, begin by listing the steps in a process. Then classify each step as either a procedure or a decision (or check) point. Try to not make the flowchart too detailed or it may be overwhelming, but be careful not to omit any key steps.

Check Sheets. A check sheet is a simple tool frequently used for problem identification. Check sheets provide a format that enables users to record and organize data in a way that facilitates collection and analysis. This format might be one of simple checkmarks. Check sheets are designed on the basis of what the users are attempting to learn by collecting data.

Many different formats can be used for a check sheet, and there are many different types of sheets. One frequently used form of check sheet deals with type of defect, another with loca- tion of defects. These are illustrated in Figures 9.4 and 9.5 .

Figure 9.4 shows tallies that denote the type of defect and the time of day each occurred. Problems with missing labels tend to occur early in the day and smeared print tends to occur late in the day, whereas off-center labels are found throughout the day. Identifying types of defects and when they occur can help in pinpointing causes of the defects.

Figure 9.5 makes it easy to see where defects on the product—in this case, a glove—are occurring. Defects seem to be occurring on the tips of the thumb and first finger, in the finger valleys (especially between the thumb and first finger), and in the center of the gloves. Again, this may help determine why the defects occur and lead to a solution.

Histograms. A histogram can be useful in getting a sense of the distribution of observed values. Among other things, one can see if the distribution is symmetrical, what the range of values is, and if there are any unusual values. Figure 9.6 illustrates a histogram. Note the two peaks. This suggests the possibility of two distributions with different centers. Possible causes might be two workers or two suppliers with different quality.

Pareto Analysis. Pareto analysis is a technique for focusing attention on the most impor- tant problem areas. The Pareto concept, named after the 19th-century Italian economist Vil- fredo Pareto, is that a relatively few factors generally account for a large percentage of the

LO9.13 Describe and use various quality tools.

Flowchart  A diagram of the steps in a process.

Check sheet  A tool for record- ing and organizing data to iden- tify a problem.

Histogram  A chart of an empirical frequency distribution.

Pareto analysis  Technique for classifying problem areas according to degree of impor- tance, and focusing on the most important.

About the Author Bill Kowalski is a Senior Partner with Leap Technologies, the leading provider of Change Acceleration Tools for Six Sigma Deployment. For more articles and information on accelerating organization change, visit Leap Technologies on the Web at www.actionworkout.com .

Source: Bill Kowalski, “What Keeps Six Sigma Practitioners Up at Night?” Copyright © Leap Technologies, Inc., 2003. Used with permission.

3. Engage non-Belt managers and employees early on projects where there is existing motivation for change.

Taking actions such as these will provide a steadier stream of results, sustained executive support, and a better night’s sleep for Six Sigma practitioners!

(concluded )

ste24102_ch09_366-409.indd 392ste24102_ch09_366-409.indd 392 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 393

FIGURE 9.2 The seven basic quality tools

Defect A B C

1 2

Day

3 4

Check sheet

Flowchart

Scatter diagram

Variable B

Histogram

Frequency

Frequency

Control chart

Upper control limit

Lower control limit

Cause-and-effect diagram

Materials Equipment

People Methods

Problem

Pareto chart

Variable A

A B C D E

C B D A E

A tool for organizing and collecting data; a tally of problems or other events by category

A graph that shows the degree and direction of relationship between two variables

A chart that shows an empirical frequency distribution

A diagram that arranges categories from highest to lowest frequency of occurrence

A statistical chart of time-ordered values of a sample statistic (e.g., sample means)

A diagram used to organize a search for the cause(s) of a problem; also known as a fishbone diagram

A diagram of the steps in a process

ste24102_ch09_366-409.indd 393ste24102_ch09_366-409.indd 393 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

394 Chapter Nine Management of Quality

FIGURE 9.3 Flowchart of catalog call

Available?

Customer places call

Specify desired item(s)

Begin

End

Confirm order

Specify delivery instructions

Indicate method of payment

Call back?

Lost sale

Alternate selection?

Lost sale

Yes

Yes

Yes

No

No

No

No Yes

Possible lost sale

Possible lost sale

Possible wrong instructions

Busy signal?

FIGURE 9.4 An example of a check sheet

Day Time Missing label

Off- center

Smeared print

Loose or folded Other

M 8–9

9–10

10–11

11–12

1–2

2–3

3–4

Type of Defect

Total

Total

(Torn)

6

3

5

3

1

6

8

5 14 10 2 1 32

FIGURE 9.5 A special-purpose check sheet

= Location of a defect

ste24102_ch09_366-409.indd 394ste24102_ch09_366-409.indd 394 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 395

total cases (e.g., complaints, defects, problems). The idea is to classify the cases according to degree of importance and focus on resolving the most important, leaving the less important. Often referred to as the 80–20 rule, the Pareto concept states that approximately 80 percent of the problems come from 20 percent of the items. For instance, 80 percent of machine break- downs come from 20 percent of the machines, and 80 percent of the product defects come from 20 percent of the causes of defects.

Often, it is useful to prepare a chart that shows the number of occurrences by category, arranged in order of frequency. Figure 9.7 illustrates such a chart corresponding to the check sheet shown in Figure 9.4 . The dominance of the problem with off-center labels becomes apparent. Presumably, the manager and employees would focus on trying to resolve this prob- lem. Once they accomplished that, they could address the remaining defects in similar fash- ion; “smeared print” would be the next major category to be resolved, and so on. Additional check sheets would be used to collect data to verify that the defects in these categories have been eliminated or greatly reduced. Hence, in later Pareto diagrams, categories such as “off- center” may still appear but would be much less prominent.

Scatter Diagrams. A scatter diagram can be useful in deciding if there is a correla- tion between the values of two variables. A correlation may point to a cause of a problem. Figure 9.8 shows an example of a scatter diagram. In this particular diagram, there is a posi- tive (upward-sloping) relationship between the humidity and the number of errors per hour. High values of humidity correspond to high numbers of errors, and vice versa. On the other hand, a negative (downward-sloping) relationship would mean that when values of one vari- able are low, values of the other variable are high, and vice versa.

The higher the correlation between the two variables, the less scatter in the points; the points will tend to line up. Conversely, if there were little or no relationship between two

Scatter diagram  A graph that shows the degree and direction of relationship between two variables.

FIGURE 9.6 A histogram

Repair time (minutes)

Frequency

FIGURE 9.7 A Pareto diagram based on data in Figure 9.4

15

Loose OtherMissing label

Smeared print

Off- center

44%

75%

91% 97% 100%

N u

m b

er o

f d

ef ec

ts

5

10

ste24102_ch09_366-409.indd 395ste24102_ch09_366-409.indd 395 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

396 Chapter Nine Management of Quality

variables, the points would be completely scattered. In Figure 9.8 , the correlation between humidity and errors seems strong because the points appear to scatter along an imaginary line.

Control Charts. A control chart can be used to monitor a process to see if the process output is random. It can help detect the presence of correctable causes of variation. Figure 9.9 illustrates a control chart. Control charts also can indicate when a problem occurred and give insight into what caused the problem. Control charts are described in detail in Chapter 10.

Cause-and-Effect Diagrams. A cause-and-effect diagram offers a structured approach to the search for the possible cause(s) of a problem. It is also known as a fishbone diagram because of its shape, or an Ishikawa diagram, after the Japanese professor who developed the approach to aid workers overwhelmed by the number of possible sources of problems when problem solv- ing. This tool helps to organize problem-solving efforts by identifying categories of factors that might be causing problems. Often this tool is used after brainstorming sessions to organize the ideas generated. Figure 9.10 illustrates one form of a cause-and-effect diagram.

Some errors are more likely causes than others, depending on the nature of the errors. If the cause is still not obvious at this point, additional investigation into the root cause may be nec- essary, involving a more in-depth analysis. Often, more detailed information can be obtained

Control chart  A statistical chart of time-ordered values of a sample statistic.

Cause-and-effect diagram  A diagram used to search for the cause(s) of a problem; also called fishbone diagram.

FIGURE 9.9 A control chart

Time

Upper control limit

Lower control limit

FIGURE 9.10 One format of a cause-and-effect diagram

Effect

cause

cause

cause cause

cause

cause

cause cause

cause cause

cause

cause

cause cause

People Equipment

Methods Materials

FIGURE 9.8 A scatter diagram

Number of errors per hour

Humidity

ste24102_ch09_366-409.indd 396ste24102_ch09_366-409.indd 396 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 397

by asking who, what, where, when, why, and how questions about factors that appear to be the most likely sources of problems.

Run Charts. A run chart can be used to track the values of a variable over time. This can aid in identifying trends or other patterns that may be occurring. Figure  9.11 provides an example of a run chart showing a decreasing trend in accident frequency over time. Important advantages of run charts are ease of construction and ease of interpretation.

Illustrations of the Use of Graphical Tools This section presents some illustrations of the use of graphical tools in process or product improvement. Figure 9.12 begins with a check sheet that can be used to develop a Pareto chart of the types of errors found. That leads to a more focused analysis of the most frequently occurring type of error using a cause-and-effect diagram. Additional cause-and-effect dia- grams, such as errors by location, might also be used.

Run chart  Tool for tracking results over a period of time.

FIGURE 9.12 Employing graphical tools in problem solving

Location C

1

2

3

4

Type of Error

B D A E

4 3 1 2

A

B C

D E

Check sheet: Type of error by location

Pareto diagram: A errors by location

Pareto chart: Type of error

Cause-and-effect diagram: A errors

A

FIGURE 9.11 A run chart shows performance over time

2

Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov.

1

Average number of accidents per week

ste24102_ch09_366-409.indd 397ste24102_ch09_366-409.indd 397 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

398 Chapter Nine Management of Quality

Figure 9.13 shows how Pareto charts measure the amount of improvement achieved in a before-and-after scenario of errors.

Figure 9.14 illustrates how control charts track two phases of improvement in a process that was initially out of control.

Methods for Generating Ideas Some additional tools that are useful for problem solving and/or for process improvement are brainstorming, quality circles, and benchmarking.

Brainstorming. Brainstorming is a technique in which a group of people share thoughts and ideas on problems in a relaxed atmosphere that encourages unrestrained collective think- ing. The goal is to generate a free flow of ideas on identifying problems, and finding causes, solutions, and ways to implement solutions. In successful brainstorming, criticism is absent, no single member is allowed to dominate sessions, and all ideas are welcomed. Structured brainstorming is an approach to assure that everyone participates.

Quality Circles. One way companies have tapped employees for ideas concerning quality improvement is through quality circles . The circles comprise a number of workers who get together periodically to discuss ways of improving products and processes. Not only are quality circles a valuable source of worker input, they also can motivate workers, if handled properly, by demonstrating management interest in worker ideas. Quality circles are usually less struc- tured and more informal than teams involved in continuous improvement, but in some orga- nizations quality circles have evolved into continuous improvement teams. Perhaps a major distinction between quality circles and teams is the amount of authority given to the teams.

Brainstorming  Technique for generating a free flow of ideas in a group of people.

Quality circles  Groups of workers who meet to discuss ways of improving products or processes.

FIGURE 9.13 Comparison of before and after using Pareto charts

100% Before

100%

After

Improvement

FIGURE 9.14 Using a control chart to track improvements

Additional improvements made to the process

UCL

LCL

UCL � Upper Control Limit LCL � Lower Control Limit

UCL

LCL

UCL

LCL

Process centered and stable

Process not centered and not stable

May 3 May 15

ste24102_ch09_366-409.indd 398ste24102_ch09_366-409.indd 398 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 399

Typically, quality circles have had very little authority to implement any but minor changes; continuous improvement teams are sometimes given a great deal of authority. Consequently, continuous improvement teams have the added motivation generated by empowerment.

Benchmarking. Benchmarking is an approach that can inject new energy into improvement efforts. Summarized in Table 9.9 , benchmarking is the process of measuring an organization’s performance on a key customer requirement against the best in the industry, or against the best in any industry. Its purpose is to establish a standard against which performance is judged, and to identify a model for learning how to improve. A benchmark demonstrates the degree to which customers of other organizations are satisfied. Once a benchmark has been identified, the goal is to meet or exceed that standard through improvements in appropriate processes.

The benchmarking process usually involves these steps:

1. Identify a critical process that needs improvement (e.g., order entry, distribution, service after sale).

2. Identify an organization that excels in the process, preferably the best.

3. Contact the benchmark organization, visit it, and study the benchmark activity.

4. Analyze the data.

5. Improve the critical process at your own organization.

Selecting an industry leader provides insight into what competitors are doing; but competi- tors may be reluctant to share this information. Several organizations are responding to this difficulty by conducting benchmarking studies and providing that information to other orga- nizations without revealing the sources of the data.

Selecting organizations that are world leaders in different industries is another alterna- tive. For example, the Xerox Corporation uses many benchmarks: For employee involvement, Procter & Gamble; for quality process, Florida Power and Light and Toyota; for high-volume production, Canon; for billing collection, American Express; for research and development, AT&T and Hewlett-Packard; for distribution, L.L. Bean and Hershey Foods; and for daily scheduling, Cummins Engine.

Benchmarking  Process of measuring performance against the best in the same or another industry.

1. What organizations do it the best? 2. How do they do it? 3. How do we do it now? 4. How can we change to match or exceed the best?

TABLE 9.9 The benchmarking approach

Hewlett-Packard, a world leader in research and development, created the TouchSmart PC. Joint research with universities, customers, and partners meets the scientific and business objectives of HP. This model is a benchmark for other companies.

ste24102_ch09_366-409.indd 399ste24102_ch09_366-409.indd 399 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

400 Chapter Nine Management of Quality

10. Indication of last update date Yes, 17%; no, 83%

11. A privacy policy Yes, 53%; no, 47% 12. Presence of a search engine Yes, 59%; no, 41% 13. Translation to multiple languages Yes, 11%; no, 89%

The corporations are doing well on most factors, but they need improvement on the last five.

The list is a handy reference other organizations can use to bench- mark their existing home pages to see where improvements are needed or to develop effective home pages.

Question Give one reason for the importance of each factor. Source: Based on Nabil Tamimi, Murli Rajan, and Rose Sebastianelli, “Bench- marking the Home Pages of ‘Fortune 500’ Companies.” Reprinted with permis- sion from Quality Progress © 2000 American Society for Quality. No further distribution allowed without permission.

More and more people are using the Internet. And when these people want information about a company’s products or services, they often go to the company’s Web site. In a study of the home pages of Fortune 500 companies, 13 factors were deemed critical to quality. Those factors, and the survey results, are shown below:

1. Use of meta tags (e.g., keywords used by search engines) Yes, 70%; no, 30%

2. Meaningful home page title Yes, 97%; no, 3% 3. Unique domain name Yes, 91%; no, 9% 4. Search engine site registration 97% (average) 5. Server reliability 99% (average) 6. Average speed of loading (seconds) 28k, 19.3; 56k, 10.9; T1, 2.6 sec. 7. Average number of bad links .40 8. Average number of spelling errors .16 9. Visibility of contact information Yes, 74%; no, 26%

READING Benchmarking Corporate Web Sites of Fortune 500 Companies

9.11 OPERATIONS STRATEGY

All customers are concerned with the quality of goods or services they receive. For this reason alone, business organizations have a vital, strategic interest in achieving and maintaining high quality standards. Moreover, there is a positive link between quality and productivity, giving an additional incentive for achieving high quality and being able to present that image to cur- rent and potential customers.

The best business organizations view quality as a never-ending journey. That is, they strive for continual improvement with the attitude that no matter how good quality is, it can always be improved, and there are benefits for doing so.

In order for total quality management to be successful, it is essential that a majority of those in an organization buy in to the idea. Otherwise, there is a risk that a significant portion of the benefits of the approach will not be realized. Therefore, it is important to give this suf- ficient attention, and to confirm that concordance exists before plunging ahead. A key aspect of this is a top-down approach: Top management needs to be visibly involved and needs to be supportive, both financially and emotionally. Also important is education of managers and workers in the concepts, tools, and procedures of quality. Again, if education is incomplete, there is the risk that TQM will not produce the desired benefits.

And here’s a note of caution: Although customer retention rates can have a dramatic impact on profitability, customer satisfaction does not always guarantee customer loyalty. Conse- quently, organizations may need to develop a retention strategy to deal with this possibility.

It is not enough for an organization to incorporate quality into its operations; the entire sup- ply chain has to be involved. Problems such as defects in purchased parts, long lead times, and late or missed deliveries of goods or services all negatively impact an organization’s ability to satisfy its customers. So it is essential to incorporate quality throughout the supply chain.

This chapter presents philosophies and tools that can be used to achieve high quality and continually improve quality. Quality is the culmination of efforts of the entire organization and its supply chain. It begins with careful assessment of what the customers want, then translating this information into technical specifications to which goods or services must conform. The specifications guide product and service design, process design, production of goods and delivery of services, and service after the sale or delivery.

SUMMARY

ste24102_ch09_366-409.indd 400ste24102_ch09_366-409.indd 400 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 401

The consequences of poor quality include loss of market share, liability claims, a decrease in produc- tivity, and an increase in costs. Quality costs include costs related to prevention, appraisal, and failure. Determinants of quality are design, conformance to design, ease of use, and service after delivery.

Modern quality management is directed at preventing mistakes rather than finding them after they occur and reducing process output variation. Currently, the business community shows widespread interest in improving quality and competitiveness.

The chapter includes a description of the key contributors to quality management, and it outlines the ISO 9000, ISO 14000, and ISO 24700 international quality standards.

Three awards of distinction, the Baldrige Award, the European Quality Award, and the Deming Prize, are given annually to organizations that have shown great achievement in quality management.

Total quality management is a never-ending pursuit of quality that involves everyone in an organiza- tion. The driving force is customer satisfaction; a key philosophy is continuous improvement. Train- ing of managers and workers in quality concepts, tools, and procedures is an important aspect of the approach. Teams are an integral part of TQM.

Two major aspects of the TQM approach are problem solving and process improvement. Six-sigma programs are a form of TQM. They emphasize the use of statistical and management science tools on selected projects to achieve business results.

1. Price and quality are the two primary considerations in every buying transaction, so quality is extremely important.

2. Quality gurus have made important contributions to the way business organizations view quality and achieve quality.

3. Quality certification and quality awards are important because they can provide some degree of assurance to customers about quality.

4. Many simple-to-use tools are available for problem solving and process improvement.

KEY POINTS

appraisal costs, 378 Baldrige Award, 381 benchmarking, 399 brainstorming, 398 cause-and-effect (fishbone) diagram, 396 check sheet, 392 continuous improvement, 385 control chart, 396 Deming Prize, 370 European Quality Award, 381 external failures, 379 fail-safing, 385

failure costs, 379 flowchart, 392 histogram, 392 internal failures, 379 ISO 9000, 382 ISO 14000, 382 ISO 24700, 382 kaizen, 385 Pareto analysis, 392 plan-do-study-act (PDSA) cycle, 388 prevention costs, 379 process improvement, 389

quality, 367 quality at the source, 386 quality circles, 398 quality of conformance, 375 quality of design, 375 return on quality, 379 run chart, 397 scatter diagram, 395 six sigma, 390 total quality management (TQM), 385

KEY TERMS

SOLVED PROBLEM

The county sheriff’s department handed out the following tickets on a summer weekend. Make a check sheet and a Pareto diagram for the types of infractions.

Problem

Ticket Number Infraction

1 Excessive speed

2 Expired inspection

3 Improper turn

4 Excessive speed

5 Parking violation

6 Parking violation

7 Excessive speed

ste24102_ch09_366-409.indd 401ste24102_ch09_366-409.indd 401 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

402 Chapter Nine Management of Quality

2

4

6

8

10

Parking violation

Excessive speed

Improper turn

Expired inspection

Check sheet (list the types of infractions, tally, summarize frequencies):

Pareto diagram (arrange infractions from highest frequency to lowest):

Infraction Tally Frequency

Excessive speed //// 5

Expired inspection // 2

Improper turn /// 3

Parking violation //// //// 10

1. List and briefly explain a. The dimensions of service quality. b. The determinants of quality.

2. Define the terms quality of design and quality of conformance.

3. What are some possible consequences of poor quality?

4. Use the dimensions of quality to describe typical characteristics of these products and services: a. A television set. b. A restaurant meal (product). c. A restaurant meal (service). d. Painting a house. e. Surgery and postsurgery care.

5. Many product reviews are available on the Internet. Two examples are reviews on electronics products such as DVD players and high-definition televisions. There are often both positive and negative reviews.

a. Do such reviews (positive and negative) influence your purchasing decisions? Why or why not? b. Why do you suppose consumers take the time and effort to write such reviews? c. There is often a feedback button asking if you found the review helpful. Do you usually

respond? Why or why not?

6. Describe the quality–ethics connection.

7. Select one of the quality gurus and briefly describe his major contributions to quality management.

8. a. What is ISO 9000, and why is it important for global businesses to have ISO 9000 certification? b. Compare the Baldrige Award and ISO certification. If an organization were going to seek both,

which one should it seek first? Why?

DISCUSSION AND REVIEW QUESTIONS

Ticket Number Infraction

8 Parking violation

9 Improper turn

10 Parking violation

11 Expired inspection

12 Parking violation

13 Improper turn

14 Parking violation

15 Excessive speed

16 Parking violation

17 Parking violation

18 Parking violation

19 Excessive speed

20 Parking violation

Solution

ste24102_ch09_366-409.indd 402ste24102_ch09_366-409.indd 402 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 403

1. What trade-offs are involved in deciding on whether to offer a product or service guarantee?

2. Who needs to be involved in setting priorities for quality improvement?

3. Name several ways that technology has had an impact on quality.

TAKING STOCK

9. Briefly explain how a company can achieve lower production costs and increase productivity by improving the quality of its products or services.

10. What are the key elements of the TQM approach? What is the driving force behind TQM?

11. Briefly describe each of the seven quality tools.

12. Briefly define or explain each of these tools: a. Brainstorming. b. Benchmarking. c. Run charts.

13. Explain the plan-do-study-act cycle.

14. List the steps of problem solving.

15. Select four tools and describe how they could be used in problem solving.

16. List the steps of process improvement.

17. Select four tools and describe how they could be used for process improvement.

1. A computer repair shop had received a number of complaints on the length of time it took to make repairs. The manager responded by increasing the repair staff by 10 percent. Complaints on repair time quickly decreased, but then complaints on the cost of repairs suddenly increased. Oddly enough, when repair costs were analyzed, the manager found that the average cost of repair had actually decreased relative to what it was before the increase in staff. What are some possible expla- nations for the complaints, and what actions might the manager contemplate?

2. As a manager, how would you deal with the possibility that customer satisfaction does not always lead to customer retention?

3. What quality-related trade-offs might there be between having a single large, centralized produce- processing facility and having many small, decentralized produce-processing facilities?

4. Give three examples of what would be considered unethical behavior involving management of quality, and state which ethical principle (see Chapter 1) is violated.

CRITICAL THINKING

EXERCISES

Ticket No. Work Ticket No. Work Ticket No. Work

1 Tires 11 Brakes 21 Lube & oil

2 Lube & oil 12 Lube & oil 22 Brakes

3 Tires 13 Battery 23 Transmission

4 Battery 14 Lube & oil 24 Brakes

5 Lube & oil 15 Lube & oil 25 Lube & oil

6 Lube & oil 16 Tires 26 Battery

7 Lube & oil 17 Lube & oil 27 Lube & oil

8 Brakes 18 Brakes 28 Battery

9 Lube & oil 19 Tires 29 Brakes

10 Tires 20 Brakes 30 Tires

1. Make a check sheet and then a Pareto diagram for the following car repair shop data:

2. An air-conditioning repair department manager has compiled data on the primary reason for 41 service calls for the previous week, as shown in the table. Using the data, make a check sheet for the problem types for each customer type, and then construct a Pareto diagram for each type of customer.

PROBLEMS

ste24102_ch09_366-409.indd 403ste24102_ch09_366-409.indd 403 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

404 Chapter Nine Management of Quality

3. Prepare a run chart similar to Figure 9.11 for the occurrences of defective computer monitors based on the following data, which an analyst obtained from the process for making the monitors. Work- ers are given a 15-minute break at 10:15 a.m. and 3:15 p.m., and a lunch break at noon. What can you conclude?

4. Prepare a run diagram for this emergency call data. Use five-minute intervals (i.e., count the calls received in each five-minute interval. Use intervals of 0–4, 5–9, etc.). Note: Two or more calls may occur in the same minute; there were three operators on duty this night. What can you conclude from the run chart?

Call Time Call Time Call Time Call Time

1 1:03 12 1:36 23 1:56 34 2:08

2 1:06 13 1:39 24 2:00 35 2:11

3 1:09 14 1:42 25 2:00 36 2:12

4 1:11 15 1:43 26 2:01 37 2:12

5 1:12 16 1:44 27 2:02 38 2:13

6 1:17 17 1:47 28 2:03 39 2:14

7 1:21 18 1:48 29 2:03 40 2:14

8 1:27 19 1:50 30 2:04 41 2:16

9 1:28 20 1:52 31 2:06 42 2:19

10 1:29 21 1:53 32 2:07

11 1:31 22 1:56 33 2:08

Job Number

Problem/ Customer Type

Job Number

Problem/ Customer Type

Job Number

Problem/ Customer Type

301 F/R 315 F/C 329 O/C

302 O/R 316 O/C 330 N/R

303 N/C 317 W/C 331 N/R

304 N/R 318 N/R 332 W/R

305 W/C 319 O/C 333 O/R

306 N/R 320 F/R 334 O/C

307 F/R 321 F/R 335 N/R

308 N/C 322 O/R 336 W/R

309 W/R 323 F/R 337 O/C

310 N/R 324 N/C 338 O/R

311 N/R 325 F/R 339 F/R

312 F/C 326 O/R 340 N/R

313 N/R 327 W/C 341 O/C

314 W/C 328 O/C

Interval Start Time

Number of Defects

Interval Start Time

Number of Defects

Interval Start Time

Number of Defects

8:00 1 10:45 0 2:15 0

8:15 0 11:00 0 2:30 2

8:30 0 11:15 0 2:45 2

8:45 1 11:30 1 3:00 3

9:00 0 11:45 3 3:30 0

9:15 1 1:00 1 3:45 1

9:30 1 1:15 0 4:00 0

9:45 2 1:30 0 4:15 0

10:00 3 1:45 1 4:30 1

10:30 1 2:00 1 4:45 3

Key Problem type: N  �  Noisy F  �  Equipment failure W  �  Runs warm O  �  Odor Customer type: C  �  Commercial customer R  �  Residential customer

ste24102_ch09_366-409.indd 404ste24102_ch09_366-409.indd 404 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 405

5. Suppose that a table lamp fails to light when turned on. Prepare a simple cause-and-effect diagram to analyze possible causes.

6. Prepare a cause-and-effect diagram to analyze the possible causes of late delivery of parts ordered from a supplier.

7. Prepare a cause-and-effect diagram to analyze why a machine has produced a large run of defec- tive parts.

8. Prepare a scatter diagram for each of these data sets and then express in words the apparent rela- tionship between the two variables. Put the first variable on the horizontal axis and the second variable on the vertical axis.

a.

b.

9. Prepare a flowchart that describes going to the library to study for an exam. Your flowchart should include these items: finding a place at the library to study; checking to see if you have your book, paper, highlighter, and so forth; traveling to the library; and the possibility of moving to another location if the place you chose to study starts to get crowded.

10. College students trying to register for a course sometimes find that the course has been closed, or the section they want has been closed. Prepare a cause-and-effect diagram for this problem.

11. The county sheriff’s department responded to an unusually large number of vehicular accidents along a quarter-mile stretch of highway in recent months. Prepare a cause-and-effect diagram for this problem.

12. Suppose you are going to have a prescription filled at a local pharmacy. Referring to the dimen- sions of service quality for each dimension, give an example of how you would judge the quality of the service.

Temperature ( � F) 65 63 72 66 82 58 75 86 77 65 79

Error rate 1 2 0 0 3 3 1 5 2 1 3

Age 24 30 22 25 33 27 36 58 37 47 54 28 42 55

Absenteeism rate 6 5 7 6 4 5 4 1 3 2 2 5 3 1

The operations manager of a firm that produces frozen dinners had received numerous complaints from supermarkets about the firm’s Chick-n-Gravy dinners. The manager then asked her assistant, Ann, to investigate the matter and to report her recommendations.

Ann’s first task was to determine what problems were generating the complaints. The majority of complaints centered on five defects: underfilled packages, a missing label, spills/mixed items, unacceptable taste, and improperly sealed packages.

Next, she took samples of dinners from the two production lines and examined each sample, mak- ing note of any defects that she found. A summary of those results is shown in the table.

The data resulted from inspecting approximately 800 frozen din- ners. What should Ann recommend to the manager?

CASE

DEFECT OBSERVED

Date Time Line Underfilled Missing Label

Spill/ Mixed

Unacceptable Taste

Improperly Sealed

5/12 0900 1 ✓✓ ✓ ✓✓✓ 5/12 1330 2 ✓✓ ✓✓ 5/13 1000 2 ✓ ✓✓✓ 5/13 1345 1 ✓✓ ✓✓ 5/13 1530 2 ✓✓ ✓✓✓ ✓ 5/14 0830 1 ✓✓✓ ✓✓✓ 5/14 1100 2 ✓ ✓ ✓✓ 5/14 1400 1 ✓ ✓ 5/15 1030 1 ✓✓✓ ✓✓✓✓✓

Chick-n-Gravy Dinner Line

(continued )

ste24102_ch09_366-409.indd 405ste24102_ch09_366-409.indd 405 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

406 Chapter Nine Management of Quality

DEFECT OBSERVED

Date Time Line Underfilled Missing Label

Spill/ Mixed

Unacceptable Taste

Improperly Sealed

5/15 1145 2 ✓ ✓✓ 5/15 1500 1 ✓ ✓ 5/16 0845 2 ✓✓ ✓✓ 5/16 1030 1 ✓✓✓ ✓ ✓✓✓ 5/16 1400 1 5/16 1545 2 ✓ ✓✓✓✓ ✓ ✓ ✓✓

(concluded )

Tip Top Markets is a regional chain of supermarkets located in the southeastern United States. Karen Martin, manager of one of the stores, was disturbed by the large number of complaints from customers at her store, particularly on Tuesdays, so she obtained complaint records from the store’s customer service desk for the last nine Tuesdays.

Assume you have been asked to help analyze the data and to make recommendations for improvement. Analyze the data using a check sheet, a Pareto diagram, and run charts. Then construct a

cause-and-effect diagram for the leading category on your Pareto diagram.

On July 15, changes were implemented to reduce out-of-stock com- plaints, improve store maintenance, and reduce checkout lines/pricing problems. Do the results of the last two weeks reflect improvement?

Based on your analysis, prepare a list of recommendations that will address customer complaints.

CASE Tip Top Markets

June 1

out of orange yogurt produce not fresh bread stale lemon yogurt past sell date checkout lines too long couldn’t find rice overcharged milk past sell date double charged stock clerk rude meat smelled strange cashier not friendly charged for item not purchased out of maple walnut ice cream couldn’t find the sponges something green in meat meat tasted strange didn’t like music store too cold checkout lines too slow light out in parking lot

June 8

fish smelled funny undercharged out of diet bread out of roses dented can meat spoiled out of hamburger rolls overcharged on two items fish not fresh store too warm cashier not helpful out of ice meat tasted bad telephone out of order ATM ate card overcharged slippery floor rolls stale music too loud bread past sale date

June 15

wanted smaller size overcharged on special too cold in store couldn’t find aspirin out of Wheaties undercharged out of Minute Rice checkout lines too long cashier rude out of diet cola fish tasted fishy meat smelled bad ice cream thawed overcharged on eggs double charged on hard rolls bread not fresh long wait at checkout didn’t like music wrong price on item lost wallet overcharged overcharged on bread fish didn’t smell right

June 22

milk past sales date couldn’t find oatmeal store too warm out of Bounty paper towels foreign object in meat overcharged on orange juice store too cold lines too long at checkout eggs cracked couldn’t find shoelaces couldn’t find lard out of Smucker’s strawberry jam out of 42 oz. Tide out of Frosty Flakes cereal fish really bad out of Thomas’ English Muffins windows dirty

(continued )

ste24102_ch09_366-409.indd 406ste24102_ch09_366-409.indd 406 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

Chapter Nine Management of Quality 407

July 20

out of cucumbers out of Tip Top toilet paper checkout lines too slow out of red peppers found keys in parking lot out of Tip Top napkins lost keys out of apricots wrong price on sale item telephone out of order overcharged on corn out of cocktail sauce wrong price on baby food water on floor out of 18 oz. Tide out of onions out of Tip Top tissues out of squash checkout lines too long out of iceberg lettuce out of romaine lettuce out of Tip Top paper towels

July 13

wrong price on spaghetti undercharged water on floor out of brown rice store looked messy out of mushrooms store too warm overcharged checkout lines too long checkout wait too long cashier not friendly shopping cart broken out of Cheese Doodles couldn’t find aspirin triple charged out of Tip Top lunch bags out of Saran Wrap out of Tip Top straws out of Dove Bars

July 6

out of straws store too warm out of bird food price not as advertised overcharged on butter need to open more checkouts out of masking tape shopping carts hard to steer stockboy was not helpful debris in aisles lost child out of Drano meat looked bad out of Chinese cabbage overcharged on butter store too warm out of Swiss chard floors dirty and sticky too many people in store out of Diamond chopped walnuts out of bubble bath out of Dial soap

June 29

checkout line too long restroom not clean out of Dove soap couldn’t find sponges out of Bisquick checkout lines slow eggs cracked out of 18 oz. Tide store not clean out of Campbell’s turkey soup store too cold out of pepperoni sticks cashier too slow checkout lines too long out of skim milk meat not fresh charged wrong price overcharged on melon

July 27

out of bananas wanted to know who won the lottery reported accident in parking lot store too warm wrong price on cranapple juice oatmeal spilled in bulk section out of carrots telephone out of order out of fresh figs out of Tip Top tissues out of Tip Top napkins water on floor out of Tip Top straws out of Tip Top paper towels windows dirty out of Tip Top toilet paper out of iceberg lettuce spaghetti sauce on floor dislike store decorations

out of Tip Top lunch bags

out of Peter Pan crunchy peanut butter

out of vanilla soy milk

(concluded )

ste24102_ch09_366-409.indd 407ste24102_ch09_366-409.indd 407 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

408 Chapter Nine Management of Quality

Besterfield, Dale H., Carol Besterfield-Micha, Glen Besterfield, and Mary Besterfield-Sacre. Total Qual- ity Management. 3rd ed. Upper Saddle River, NJ: Prentice Hall, 2011.

Brassard, Michael, and Diane Ritter. The Memory Jogger II: A Pocket Guide of Tools for Continuous Improvement and Effective Planning. Methuen, MA: Goal/QPC, 1994.

Butman, John. Juran: A Lifetime of Influence. New York: John Wiley & Sons, 1997.

El-Haik, Basem, and David M. Roy. Service Design for Six Sigma: A Roadmap for Excellence. Hoboken, NJ: John Wiley and Sons, 2005.

Garvin, David A. Managing Quality. New York: Free Press, 1988.

Goetsch, David L., and Stanley B. Davis. Quality Man- agement for Organizational Excellence: Introduc- tion to Total Quality Management. 6th ed. Upper Saddle River, NJ: Prentice Hall, 2010.

Gygi, Craig, Neil DeCarlo, and Bruce Williams. Six Sigma for Dummies. 2nd ed. Hoboken, NJ: John Wiley and Sons, 2012.

Scherkenbach, W. W. The Deming Route to Quality and Productivity: Roadmaps and Roadblocks. Rockville, MD: Mercury Press/Fairchild Publications, 1990.

Snee, Ronald D., and Roger W. Hoerl. Six Sigma beyond the Factory Floor: Deployment Strategies for Finan- cial Services, Health Care, and the Rest of the Real Economy. Upper Saddle River, NJ: Pearson/ Prentice Hall, 2005.

Stevenson, William J. “Supercharging Your Pareto Analysis.” Quality Progress. October 2000, pp. 51–55.

Summers, Donna. Quality. 5th ed. Upper Saddle River, NJ: Prentice Hall, 2010.

Trusko, Brett, Carolyn Pexton, Jim Harrington, and Praveen Gupta. Improving Healthcare Quality and Cost with Six Sigma. FT Press, 2007.

SELECTED BIBLIOGRAPHY AND FURTHER READINGS

ste24102_ch09_366-409.indd 408ste24102_ch09_366-409.indd 408 11/1/13 12:32 PM11/1/13 12:32 PM

Final PDF to printer

This page intentionally left blank

410

C H A P T E R

10

After completing this chapter, you should be able to:

LO10.1 Explain the need for quality control.

LO10.2 Discuss the basic issues of inspection.

LO10.3 List and briefly explain the elements of the control process.

LO10.4 Explain how control charts are used to monitor a process and the concepts that underlie their use.

LO10.5 Use and interpret control charts.

LO10.6 Perform run tests to check for nonrandomness in process output.

LO10.7 Assess process capability.

Quality Control

10.1 Introduction, 411

10.2 Inspection, 412 How Much to Inspect and How Often, 413

Where to Inspect in the Process, 414

Centralized versus On-Site Inspection, 416

10.3 Statistical Process Control, 417 Process Variability, 417

Sampling and Sampling Distributions, 418

The Control Process, 419

Control Charts: The Voice of the Process, 420

Control Charts for Variables, 422

Control Charts for Attributes, 427

Managerial Considerations Concerning Control Charts, 430

Run Tests, 431

Using Control Charts and Run Tests Together, 435

What Happens When a Process Exhibits Possible Nonrandom Variation?, 435

10.4 Process Capability, 435 Capability Analysis, 436

C p , 437

C pk , 439

Improving Process Capability, 439

Taguchi Loss Function, 440

Limitations of Capability Indexes, 440

10.5 Operations Strategy, 440

Cases: Toys, Inc., 453

Tiger Tools, 454

CHAPTER OUTLINE

LEARNING OBJECTIVES

ste24102_ch10_410-455.indd 410ste24102_ch10_410-455.indd 410 11/1/13 2:52 PM11/1/13 2:52 PM

Final PDF to printer

411

This chapter covers quality control. The purpose of quality control is to assure that pro- cesses are performing in an acceptable manner. Companies accomplish this by monitoring process output using statistical techniques. Quality control is a process that measures output relative to a standard and takes corrective action when output does not meet stan- dards. If the results are acceptable, no further action is required; unacceptable results call for corrective action.

Every process generates output that exhibits random variability. That is natural and cannot be corrected. However, if there are nonrandom variations in process output, that can be cor- rected. Quality control tools are used to decide when corrective action is needed.

10.1 INTRODUCTION Quality assurance that relies primarily on inspection of lots (batches) of previously produced items is referred to as acceptance sampling. It is described in the chapter supplement. Quality control efforts that occur during production are referred to as statistical process control, and these we examine in the following sections.

The best companies emphasize designing quality into the process, thereby greatly reducing the need for inspection or control efforts. As you might expect, different business organiza- tions are in different stages of this evolutionary process: Some rely heavily on inspection. However, inspection alone is generally not sufficient to achieve a reasonable level of quality. Many occupy a middle ground that involves some inspection and a great deal of process con- trol. Figure 10.1 illustrates these phases of quality assurance.

Quality control   A process that evaluates output relative to a standard and takes corrective action when output doesn’t meet standards.

LO10.1 Explain the need for quality control.

ste24102_ch10_410-455.indd 411ste24102_ch10_410-455.indd 411 11/1/13 2:52 PM11/1/13 2:52 PM

Final PDF to printer

412 Chapter Ten Quality Control

10.2 INSPECTION Inspection is an appraisal activity that compares goods or services to a standard. Inspection is a vital but often unappreciated aspect of quality control. Although for well-designed pro- cesses little inspection is necessary, inspection cannot be completely eliminated. And with increased outsourcing of products and services, inspection has taken on a new level of sig- nificance. In lean organizations, inspection is less of an issue than it is for other organizations because lean organizations place extra emphasis on quality in the design of both products and processes. Moreover, in lean operations, workers have responsibility for quality (quality at the source). However, many organizations do not operate in a lean mode, so inspection is important for them. This is particularly true of service operations, where quality continues to be a challenge for management.

Inspection can occur at three points: before production, during production, and after pro- duction. The logic of checking conformance before production is to make sure that inputs are acceptable. The logic of checking conformance during production is to make sure that the conversion of inputs into outputs is proceeding in an acceptable manner. The logic of checking conformance of output is to make a final verification of conformance before passing goods on to customers.

Inspection before and after production often involves acceptance sampling procedures; monitoring during the production process is referred to as process control. Figure 10.2 gives an overview of where these two procedures are applied in the production proces.

To determine whether a process is functioning as intended or to verify that a batch or lot of raw materials or final products does not contain more than a specified percentage of defec- tive goods, it is necessary to physically examine at least some of the items in question. The purpose of inspection is to provide information on the degree to which items conform to a standard. The basic issues are

1. How much to inspect and how often. 2. At what points in the process inspection should occur.

3. Whether to inspect in a centralized or on-site location.

4. Whether to inspect attributes (i.e., count the number of times something occurs) or vari- ables (i.e., measure the value of a characteristic).

Consider, for example, inspection at an intermediate step in the manufacture of personal computers. Because inspection costs are often significant, questions naturally arise on whether one needs to inspect every computer or whether a small sample of computers will suffice. Moreover, although inspections could be made at numerous points in the production process, it is not generally cost-effective to make inspections at every point. Hence, the question comes up of which points should be designated for inspections. Once these points have been identi- fied, a manager must decide whether to remove the computers from the line and take them to

Inspection   Appraisal of goods or services.

LO10.2 Discuss the basic issues of inspection.

FIGURE 10.1 Approaches to quality assurance

Continuous improvement

Process control

Inspection alone

Inspection

The least progressive The most progressive

Inspection and corrective

action during production

Quality built into the process

FIGURE 10.2 Acceptance sampling and process control

OutputsTransformationInputs

Acceptance sampling

Process control

Acceptance sampling

ste24102_ch10_410-455.indd 412ste24102_ch10_410-455.indd 412 11/1/13 2:52 PM11/1/13 2:52 PM

Final PDF to printer

Chapter Ten Quality Control 413

a lab, where specialized equipment might be available to perform certain tests, or to test them where they are being made. We will examine these points in the following sections.

How Much to Inspect and How Often The amount of inspection can range from no inspection whatsoever to inspection of each item numerous times. Low-cost, high-volume items such as paper clips, roofing nails, and wooden pencils often require little inspection because (1) the cost associated with passing defective items is quite low and (2) the processes that produce these items are usually highly reliable, so defects are rare. Conversely, high-cost, low-volume items that have large costs associated with passing defective products often require more intensive inspections. Thus, critical com- ponents of a manned-flight space vehicle are closely scrutinized because of the risk to human safety and the high cost of mission failure. In high-volume systems, automated inspection is one option that may be employed.

The majority of quality control applications lie somewhere between the two extremes. Most require some inspection, but it is neither possible nor economically feasible to critically examine every part of a product or every aspect of a service for control purposes. The cost of inspection, resulting interruptions of a process or delays caused by inspection, and the man- ner of testing typically outweigh the benefits of 100 percent inspection. Note that for manual inspection, even 100 percent inspection does not guarantee that all defects will be found and removed. Inspection is a process, and hence, subject to variation. Boredom and fatigue are factors that cause inspection mistakes. Moreover, when destructive testing is involved (items are destroyed by testing), that must be taken into account. However, the cost of letting unde- tected defects slip through is sufficiently high that inspection cannot be completely ignored. The amount of inspection needed is governed by the costs of inspection and the expected costs of passing defective items. As illustrated in Figure 10.3 , if inspection activities increase, inspection costs increase, but the costs of undetected defects decrease. The traditional goal was to minimize the sum of these two costs. In other words, it may not pay to attempt to catch every defect, particularly if the cost of inspection exceeds the penalties associated with letting some defects get through. Current thinking is that every reduction in defective output reduces costs, although not primarily by inspection.

As a rule, operations with a high proportion of human involvement necessitate more inspection effort than mechanical operations, which tend to be more reliable.

A Toyota technician prepares to remove the accelerator assembly in a recalled Toyota Avalon.

ste24102_ch10_410-455.indd 413ste24102_ch10_410-455.indd 413 11/1/13 2:52 PM11/1/13 2:52 PM

Final PDF to printer

414 Chapter Ten Quality Control

The frequency of inspection depends largely on the rate at which a process may go out of control or on the number of lots being inspected. A stable process will require only infre- quent checks, whereas an unstable one or one that has recently given trouble will require more frequent checks. Likewise, many small lots will require more samples than a few large lots because it is important to obtain sample data from each lot. For high-volume, repetitive operations, computerized automatic inspections at critical points in a process are cost effective.

Where to Inspect in the Process Many operations have numerous possible inspection points. Because each inspection adds to the cost of the product or service, it is important to restrict inspection efforts to the points where they can do the most good. In manufacturing, some of the typical inspection points are

1. Raw materials and purchased parts. There is little sense in paying for goods that do not meet quality standards and in expending time and effort on material that is bad to begin with. Supplier certification programs can reduce or eliminate the need for inspection.

2. Finished products. Customer satisfaction and the firm’s image are at stake here, and repairing or replacing products in the field is usually much more costly than doing it at the factory. Likewise, the seller is usually responsible for shipping costs on returns, and payments for goods or service may be held up pending delivery of satisfactory goods or remedial service. Well-designed processes, products and services, quality at the source, and process monitoring can reduce or eliminate the need for inspection.

3. Before a costly operation. The point is to not waste costly labor or machine time on items that are already defective.

4. Before an irreversible process. In many cases, items can be reworked up to a certain point; beyond that point they cannot. For example, pottery can be reworked prior to fir- ing. After that, defective pottery must be discarded or sold as seconds at a lower price.

5. Before a covering process. Painting, plating, and assemblies often mask defects.

Inspection can be used as part of an effort to improve process yield. One measure of pro- cess yield is the ratio of output of good product to the total output. Inspection at key points can help guide process improvement efforts to reduce the scrap rate and improve the overall process yield, and reduce or eliminate the need for inspection.

In the service sector, inspection points are incoming purchased materials and supplies, per- sonnel, service interfaces (e.g., service counter), and outgoing completed work (e.g., repaired appliances). Table 10.1 illustrates a number of examples.

FIGURE 10.3 Traditional view: The amount of inspection is optimal when the sum of the costs of inspection and passing defectives is minimized

Total cost Cost of inspection

Cost of passing defectives

Optimal

Amount of inspection

0

C o

st

ste24102_ch10_410-455.indd 414ste24102_ch10_410-455.indd 414 11/1/13 2:52 PM11/1/13 2:52 PM

Final PDF to printer

Chapter Ten Quality Control 415

Type of Business Inspection Points Characteristics

Fast food Cashier Counter area Eating area Building and grounds Kitchen

Parking lot

Accuracy Appearance, productivity Cleanliness, no loitering Appearance, safety hazards Cleanliness, purity of food, food storage, health

regulations Safety, good lighting

Hotel/motel Accounting/billing Building and grounds Main desk Maid service Personnel Reservations/occupancy Restaurants Room service Supplies

Accuracy, timeliness Appearance and safety Appearance, waiting times, accuracy of bills Completeness, productivity Appearance, manners, productivity Over/underbooking, percent occupancy Kitchen, menus, meals, bills Waiting time, quality of food Ordering, receiving, inventories

Supermarket Cashiers Deliveries Produce Aisles and stockrooms Inventory control Shelf stock Shelf displays Checkouts Shopping carts

Parking lot Personnel

Accuracy, courtesy, productivity Quality, quantity Freshness, ample stock Uncluttered layout Stock-outs Ample supply, rotation of perishables Appearance Waiting time Good working condition, ample supply,

theft/vandalism Safety, good lighting Appearance, productivity

Doctor’s office Waiting room Examination room Doctor Doctor’s assistant Patient records Billing Other

Appearance, comfortable Clean, temperature controlled Neat, friendly, concerned, skillful, knowledgeable Neat, friendly, concerned, skillful Accurate, up-to-date Accurate Waiting time minimal, adequate time with doctor

TABLE 10.1 Examples of inspection points in service organizations

forward, the outer layer of chips shearing away like the face of a glacier.

The raw material is far easier to handle. An entire semi-trailer of sturdy North Dakota “chipping” potatoes can be emptied in a matter of minutes, by backing the trailer onto a hydraulic lift, tilting it 45 degrees and letting the potatoes—grown for their thin skins and low moisture—tumble out.

About a dozen semi-trailers’ worth of potatoes arrive every day. The potatoes are immediately separated into big and small sizes for a pur- pose both reasonable and extraordinary: Big potatoes make big chips that go into large bags; small potatoes make small chips for lunch-size bags.

Neil Steinberg A potato chip is a delicate thing. Fragile. A pound of pressure will crush it. So when you’re moving 250 tons of chips through your plant, as they do every day at Jays Foods, you need to have a system.

“You don’t buy potato crumbs, you buy potato chips,” said Tom Howe, CEO and co-owner of the Chicago company, at 99th and Cottage Grove. Jays makes 125 different types and brands of chips and sev- eral hundred varieties of popcorn, puffs, twists, pretzels and assorted bagged munchies.

Jays combats the tendency of potato chips to crush into flinders with a variety of conveyor belts, radial filling chutes and gently vibrating slides, where masses of chips, a yard deep, are gradually massaged

READING In the Chips at Jays

(continued )

ste24102_ch10_410-455.indd 415ste24102_ch10_410-455.indd 415 11/1/13 2:52 PM11/1/13 2:52 PM

Final PDF to printer

416 Chapter Ten Quality Control

balloon.” Japp and his father, now 93 and honorary chairman of the board, sold the company to Borden in 1986. “They almost ruined it,” Howe said, citing a slump in product quality and neglect of the Jays distribution system. “They lost the connection with the consumer.”

By 1994, Jays was on the rocks and the Japps, allied with Howe, bought the company back. “Not too many people have a second chance in life,” said Japp, whose children are in the company.

Getting the chips in the bags is another challenge: You can’t just fill up bags and seal them; the chips would be smashed. Rather, a con- veyor pours chips—gently—onto the central hub of a large, wheel- like device, where the chips scatter into 15 buckets that are, basically, scales. A computer monitors the weight of each bucket and opens up the exact combination that, in this case, will fill a 14-ounce bag. The bags are packed into boxes that read: “HANDLE LIKE EGGS.”

While not exactly perishable, potato chips do have a shelf life of about eight weeks, only one day of which is spent at the plant.

“Potatoes that are in this morning will be in our branches tomorrow morning, ready to hit the streets,” Howe said. Jays is still a regional brand, sold in Illinois, Indiana, Michigan, Wisconsin and Missouri. But business has grown 50 percent in the past two years.

“We connect to people’s lifestyle,” Howe said. “People treat them- selves with Jays. We’re in the fun food business.”

Questions 1. What characteristics of potato chips concern Jays in terms of quality? 2. Do you feel that Jays is overdoing it with its concern for quality?

Explain.

Source: Neil Steinberg, “In the Chips,” Chicago Sun-Times, December 26, 1997. Copyright © 2003 Chicago Sun-Times. Reprinted with special permission from the Chicago Sun-Times, Inc.

“Nobody wants to open a small bag and find three big potato chips in it,” Howe said.

Computers keep track of everything, shunting potatoes to 15,000- pound holding bins. Each bin feeds into a pipe containing a turning screw—a version of the ancient Archimedes screw used to pump water— that moves the potatoes from the bin to conveyor belts, to where they are washed and skinned—the skin scrubbed off by metal bristle brushes.

No machine can detect if a potato is rotten inside. So a pair of human inspectors reach into the passing brown parade and give the potatoes a quick squeeze. Occasionally, they snatch one and slice it open, usually revealing black areas of rot, a skill they attribute to experience.

“I know, ” said Alicia Jimenez, asked to explain what about a potato tips her off to slice it open and find rot.

The naked potatoes are sent into high-speed chippers—spinning brass rings, each with eight blades inside, straight blades for straight chips, ripple blades for ripple chips.

The blades cut the potatoes, but the potatoes take their revenge. Every three hours the blades are dulled and the line must be stopped so the old rings can be replaced by new rings with sharpened blades.

The sheer quantity of slicing spews big foamy banks of starch from either side of the chipper, which calls to mind a washing machine gone berserk.

Potato chips account for about 55 percent of Jays’ business. The raw chips spend three minutes cooking in hot corn oil, which

is constantly circulated and filtered. Then they are salted, and flavor- ings—barbecue, for instance, or sour cream and onion—are added.

After the chips are fried, there is another quality check, in which workers pluck burned and deformed chips out of the masses passing by. The chips are conveyed on a link grid, wide enough to let broken chips fall through.

The chips also are laser-inspected, rushing, in a single layer, over a complex device called an Opti-Sort Scanner. Chips with dark spots or holes are detected by a laser, which instructs one of 82 small tubes to fire a puff of air that knocks the substandard chip off the line, into a discard bin.

The discards—about 3 percent of production—are gathered up and used: Starch is drawn out and sold to cornstarch makers; the rest goes to hog feed. Just as the stockyards were said to use every part of the pig but the squeal, at Jays every part of the potato is used but the rich, earthy smell.

Jays even tried to sell burnt chips to the public once, about 20 years ago. “Consumers kept telling us they liked the brown chips,” said Len Japp Jr., recalling the “Brownies” variety. “It went over like a lead

Centralized versus On-Site Inspection Some situations require that inspections be performed on site. For example, inspecting the hull of a ship for cracks requires inspectors to visit the ship. At other times, specialized tests can best be performed in a lab (e.g., performing medical tests, analyzing food samples, testing metals for hardness, running viscosity tests on lubricants).

The central issue in the decision concerning on-site or lab inspections is whether the advan- tages of specialized lab tests are worth the time and interruption needed to obtain the results. Reasons favoring on-site inspection include quicker decisions and avoidance of introduction

(concluded )

ste24102_ch10_410-455.indd 416ste24102_ch10_410-455.indd 416 11/1/13 2:52 PM11/1/13 2:52 PM

Final PDF to printer

Chapter Ten Quality Control 417

of extraneous factors (e.g., damage or other alteration of samples during transportation to the lab). On the other hand, specialized equipment and a more favorable test environment (less noise and confusion, lack of vibrations, absence of dust, and no workers “helping” with inspections) offer strong arguments for using a lab.

Some companies rely on self-inspections by operators if errors can be traced back to spe- cific operators. This places responsibility for errors at their source ( quality at the source ).

10.3 STATISTICAL PROCESS CONTROL Quality control is concerned with the quality of conformance of a process: Does the output of a process conform to the intent of design? Variations in characteristics of process output provide the rationale for process control. Statistical process control (SPC) is used to evalu- ate process output to decide if a process is “in control” or if corrective action is needed.

Process Variability All processes generate output that exhibits some degree of variability. The issue is whether the output variations are within an acceptable range. The issue is addressed by answering two basic questions about the process variations:

1. Are the variations random? If nonrandom variations are present, the process is consid- ered to be unstable. Corrective action will need to be taken to improve the process by eliminating the causes of nonrandomness to achieve a stable process.

2. Given a stable process, is the inherent variability of process output within a range that conforms to performance criteria? This involves assessment of a process’s capability to meet standards. If a process is not capable, this situation will need to be addressed.

The natural or inherent process variations in process output are referred to as chance or random variations. Such variations are due to the combined influences of countless minor factors, each one so unimportant that even if it could be eliminated, the impact on process vari- ations would be negligible. In Deming’s terms, this is referred to as common variability. The amount of inherent variability differs from process to process. For instance, older machines

Quality of conformance   A product or service conforms to specifications.

Statistical process control (SPC)   Statistical evaluation of the output of a process.

Random variation   Natural variation in the output of a pro- cess, created by countless minor factors.

A Mattel technician in China does a pulling test with a Dora the Explorer doll in the name of product safety. Mattel has 10 labs in six countries and has set up strict requirements for vendors because of safety recalls.

ste24102_ch10_410-455.indd 417ste24102_ch10_410-455.indd 417 11/1/13 2:52 PM11/1/13 2:52 PM

Final PDF to printer

418 Chapter Ten Quality Control

generally exhibit a higher degree of natural variability than newer machines, partly because of worn parts and partly because new machines may incorporate design improvements that lessen the variability in their output.

A second kind of variability in process output is called assignable variation, or non- random variation. In Deming’s terms, this is referred to as special variation. Unlike natural variation, the main sources of assignable variation can usually be identified (assigned to a specific cause) and eliminated. Tool wear, equipment that needs adjustment, defective materi- als, human factors (carelessness, fatigue, noise and other distractions, failure to follow correct procedures, and so on) and problems with measuring devices are typical sources of assignable variation.

Sampling and Sampling Distributions In statistical process control, periodic samples of process output are taken and sample sta- tistics, such as sample means or the number of occurrences of a certain type of outcome, are determined. The sample statistics can be used to judge randomness of process variations. The sample statistics exhibit variation, just as processes do. The variability of sample statistics can be described by its sampling distribution, a theoretical distribution that describes the random variability of sample statistics. The most frequently used distribution is the normal distribution, for a variety of revasons.

Figure 10.4A illustrates a sampling distribution and a process distribution (i.e., the dis- tribution of process variations). Note three important things in Figure 10.4 : (1) both distri- butions have the same mean; (2) the variability of the sampling distribution is less than the variability of the process; and (3) the sampling distribution is normal. This is true even if the process distribution is not normal.

In the case of sample means, the central limit theorem states that as the sample size increases, the distribution of sample averages approaches a normal distribution regardless of the shape of the sampled population. This tends to be the case even for fairly small sample sizes. For other sample statistics, the normal distribution serves as a reasonable approxima- tion to the shape of the actual sampling distribution.

Figure 10.4B illustrates what happens to the shape of the sampling distribution relative to the sample size. The larger the sample size, the narrower the sampling distribution. This means that the likelihood that a sample statistic is close to the true value in the population is higher for large samples than for small samples.

A sampling distribution serves as the theoretical basis for distinguishing between random and nonrandom values of a sampling statistic. Very simply, limits are selected within which

Assignable variation   In process output, a variation whose cause can be identified. A nonrandom variation.

Sampling distribution   A theoretical distribution of sample statistics.

Central limit theorem   The distribution of sample averages tends to be normal regardless of the shape of the process distribution.

FIGURE 10.4A The sampling distribution of means is normal, and it has less variability than the process distribution, which might not be normal

Process and sampling distribution mean

Distribution of process output

Distribution of probable sample statistics (e.g., means) that could come from the process

FIGURE 10.4B The larger the sample size, the narrower the sampling distribution

n = 100

n = 60

n = 40

n = 20

Sampling distribution means

ste24102_ch10_410-455.indd 418ste24102_ch10_410-455.indd 418 11/1/13 2:52 PM11/1/13 2:52 PM

Final PDF to printer

Chapter Ten Quality Control 419

most values of a sample statistic should fall if its variations are random. The limits are stated in terms of number of standard deviations from the distribution mean. Typical limits are �  2 standard deviations or �  3 standard deviations. Figure 10.5 illustrates these possible limits and the probability that a sample statistic would fall within those limits if only random varia- tions are present. Conversely, if the value of a sample statistic falls outside those limits, there is only a small probability (1  �  99.74  �  .0026 for �  3 limits, and 1  �  95.44  �  .0456 for �  2 limits) that the value reflects randomness. Instead, such a value would suggest nonrandomness.

The Control Process Sampling and corrective action are only a part of the control process. Effective control requires the following steps:

Define. The first step is to define in sufficient detail what is to be controlled. It is not enough, for example, to simply refer to a painted surface. The paint can have a number of important characteristics such as its thickness, hardness, and resistance to fading or chipping. Different characteristics may require different approaches for control purposes.

LO10.3 List and briefly explain the elements of the control process.

FIGURE 10.5 Percentage of values within given ranges in a normal distribution

Mean

95.44%

99.74%

–3s –2s +2s +3s

s = Standard deviation

Food and beverage companies use Omron Electronics’ fiber optic sensors to monitor processes and to perform quality inspections such as checking beverage content and caps.

ste24102_ch10_410-455.indd 419ste24102_ch10_410-455.indd 419 11/1/13 2:52 PM11/1/13 2:52 PM

Final PDF to printer

420 Chapter Ten Quality Control

Measure. Only those characteristics that can be counted or measured are candidates for control. Thus, it is important to consider how measurement will be accomplished.

Compare. There must be a standard of comparison that can be used to evaluate the mea- surements. This will relate to the level of quality being sought.

Evaluate. Management must establish a definition of out of control. Even a process that is functioning as it should will not yield output that conforms exactly to a standard, sim- ply because of the natural (i.e., random) variations inherent in all processes, manual or mechanical—a certain amount of variation is inevitable. The main task of quality con- trol is to distinguish random from nonrandom variability, because nonrandom variability means that a process is out of control.

Correct. When a process is judged to be out of control, corrective action must be taken. This involves uncovering the cause of nonrandom variability (e.g., worn equipment, incorrect methods, failure to follow specified procedures) and correcting it.

Monitor results. To ensure that corrective action is effective, the output of a process must be monitored for a sufficient period of time to verify that the problem has been eliminated.

In sum, control is achieved by checking a portion of the goods or services, comparing the results to a predetermined standard, evaluating departures from the standard, taking corrective action when necessary, and following up to ensure that problems have been corrected.

Control Charts: The Voice of the Process An important tool in statistical process control is the control chart, which was developed by Walter Shewhart. A control chart is a time-ordered plot of sample statistics. It is used to distinguish between random variability and nonrandom variability. It has upper and lower limits, called control limits, that define the range of acceptable (i.e., random) variation for the sample statistic. A control chart is illustrated in Figure 10.6 . The purpose of a control chart is to monitor process output to see if it is random. A necessary (but not sufficient) condition for a process to be deemed “in control,” or stable, is for all the data points to fall between the upper and lower control limits. Conversely, a data point that falls outside of either limit would be taken as evidence that the process output may be nonrandom and, therefore, not “in control.” If that happens, the process would be halted to find and correct the cause of the nonrandom variation. The essence of statistical process control is to assure that the output of a process is random so that future output will be random.

The basis for the control chart is the sampling distribution, which essentially describes ran- dom variability. There is, however, one minor difficulty relating to the use of a normal sam- pling distribution. The theoretical distribution extends in either direction to infinity. Therefore, any value is theoretically possible, even one that is a considerable distance from the mean of the distribution. However, as a practical matter, we know that, say, 99.7 percent of the values will be within �  3 standard deviations of the mean of the distribution. Therefore, we could decide to set the limit, so to speak, at values that represent �  3 standard deviations from the

LO10.4 Explain how control charts are used to monitor a process and the concepts that underlie their use.

Control chart   A time-ordered plot of sample statistics, used to distinguish between random and nonrandom variability.

FIGURE 10.6 Example of a control chart

1 2 3 4 5 6 7 8 9 10 11 12

UCL

Mean

LCL

Normal variation due to chance

Sample number

Abnormal variation due to assignable sources

Abnormal variation due to assignable sources

Out of control

ste24102_ch10_410-455.indd 420ste24102_ch10_410-455.indd 420 11/1/13 2:52 PM11/1/13 2:52 PM

Final PDF to printer

Chapter Ten Quality Control 421

mean, and conclude that any value that was farther away than these limits was a nonrandom variation.

In effect, these limits are control limits: the dividing lines between what will be desig- nated as random deviations from the mean of the distribution and what will be designated as nonrandom deviations from the mean of the distribution. Figure 10.7 illustrates how control limits are based on the sampling distribution.

Control charts have two limits that separate random variation and nonrandom variation. The larger value is the upper control limit (UCL), and the smaller value is the lower control limit (LCL). A sample statistic that falls between these two limits suggests (but does not prove) randomness, while a value outside or on either limit suggests (but does not prove) nonrandomness.

It is important to recognize that because any limits will leave some area in the tails of the distribution, there is a small probability that a value will fall outside the limits even though only random variations are present. For example, if �  2 sigma (standard deviation) limits are used, they would include 95.5 percent of the values. Consequently, the complement of that number (100 percent  �  95.5 percent  �  4.5 percent) would not be included. That percent- age (or probability ) is sometimes referred to as the probability of a Type I error, where the “error” is concluding that nonrandomness is present when only randomness is present. It is also referred to as an alpha risk, where alpha (�) is the sum of the probabilities in the two tails. Figure 10.8 illustrates this concept.

Using wider limits (e.g., �  3 sigma limits) reduces the probability of a Type I error because it decreases the area in the tails. However, wider limits make it more difficult to detect non- random variations if they are present. For example, the mean of the process might shift (an assignable cause of variation) enough to be detected by two-sigma limits, but not enough to be readily apparent using three-sigma limits. That could lead to a second kind of error, known as a Type II error, which is concluding that a process is in control when it is really out of control (i.e., concluding nonrandom variations are not present, when they are). In theory, the costs of making each error should be balanced by their probabilities. However, in practice, two-sigma limits and three-sigma limits are commonly used without specifically referring to the probability of a Type II error.

Table 10.2 illustrates how Type I and Type II errors occur. Each sample is represented by a single value (e.g., the sample mean) on a control chart.

Moreover, each value is compared to the extremes of the sampling distribution (the control

Control limits   The divid- ing lines between random and nonrandom deviations from the mean of the distribution.

Type I error   Concluding a process is not in control when it actually is.

Type II error   Concluding a process is in control when it is not.

FIGURE 10.7 Control limits are based on the sampling distribution

Mean

Process distribution (x, s

x )

Sampling distribution (x, s

x

LCL UCL

)

FIGURE 10.8 The probability of a Type I error

a/2

Mean

a/2

LCL UCL

a = Probability of a Type I error

ste24102_ch10_410-455.indd 421ste24102_ch10_410-455.indd 421 11/1/13 2:52 PM11/1/13 2:52 PM

Final PDF to printer

422 Chapter Ten Quality Control

limits) to judge if it is within the acceptable (random) range. Figure 10.9 illustrates this concept.

There are four commonly used control charts. Two are used for variables, and two are used for attributes. Attribute data are counted (e.g., the number of defective parts in a sample, the number of calls per day); variables data are measured, usually on a continuous scale (e.g., amount of time needed to complete a task, length or width of a part).

The two control charts for variables data are described in the next section, and the two control charts for attribute data are described in the section following that.

Control Charts for Variables Mean and range charts are used to monitor variables. Control charts for means monitor the central tendency of a process, and range charts monitor the dispersion of a process.

Mean Charts. A mean control chart, sometimes referred to as an x (“ x � bar”) chart, is based on a normal distribution. It can be constructed in one of two ways. The choice depends on what information is available. Although the value of the standard deviation of a process, �, is often unknown, if a reasonable estimate is available, one can compute control limits using these formulas:

Upper control limit (UCL):

Lower control limit (LCL):

x z

x z

x

x

� � �

� � � (10–1)

where

/ nx� �= Standard deviation of distribution of sample meansx� �

�   �  Estimate of the process standard deviation

n   �  Sample size

z   �  The number of standard deviations that control limits are based on

= Averageof sample meansx

The following example illustrates the use of these formulas.

Variables   Generate data that are measured.

Attributes   Generate data that are counted.

Mean control chart   Control chart used to monitor the central tendency of a process.

FIGURE 10.9 Each observation is compared to the selected limits of the sampling distribution

UCL

LCL

1 2 3 4

Sample number

And the conclusion is that it is: In Control Out of Control If a process is actually: In control No error Type I error (producer’s risk)

Out of control Type II error (consumer’s risk) No error

TABLE 10.2 Type I and Type II errors

ste24102_ch10_410-455.indd 422ste24102_ch10_410-455.indd 422 11/1/13 2:52 PM11/1/13 2:52 PM

Final PDF to printer

Chapter Ten Quality Control 423

A quality inspector took five samples, each with four observations ( n   �  4), of the length of time for glue to dry. The analyst computed the mean of each sample and then computed the grand mean. All values are in minutes. Use this information to obtain three-sigma (i.e., z   �  3) control limits for means of future times. It is known from previous experience that the stan- dard deviation of the process is .02 minute.

SAMPLE

1 2 3 4 5

1 12.11 12.15 12.09 12.12 12.09 Observation 2 12.10 12.12 12.09 12.10 12.14 3 12.11 12.10 12.11 12.08 12.13 4 12.08 12.11 12.15 12.10 12.12 X 12.10 12.12 12.11 12.10 12.12

12.10 12.12 12.11 12.10 12.12

5 12.11x �

� � � � �

Using Formula 10–1, with z   �  3,  n   �  4 observations per sample, and �   �  .02, we find

UCL: 12.11 3

.02

4 12.14

LCL: 12.11 3 .02

4 12.08

� �

� �

⎛ ⎝⎜

⎞ ⎠⎟

⎛ ⎝⎜

⎞ ⎠⎟

Note: If one applied these control limits to the means, one would judge the process to be in control because all of the sample means have values that fall within the control limits. The fact that some of the individual measurements fall outside of the control limits (e.g., the first observation in Sample 2 and the last observation in Sample 3) is irrelevant. You can see why by referring to Figure 10.7 : Individual values are represented by the process distribution, a large portion of which lies outside of the control limits for means.

This and similar problems can also be solved using the Excel templates that are available on the book’s Web site. The solution for Example 1 using Excel is shown here.

E X A M P L E 1

e celx mhhe.com/stevenson12e

S O L U T I O N

Mean Control Chart (s known) Basic Clear<Back

n = z =

Average of sample means Process standard deviation Sample size

Calculations:

Average

Sample Mean

Mean 12.11

12.1 12.12 12.11 12.1 12.12

1 2 3 4 5 6

UCL = LCL =

12.11 0.02

4 3

0.1

12.14 12.08

Mean Control Chart (s known)

s =

Dz =

12.16

12.15

12.14

12.13

12.12

12.11

12.10

12.09

12.08

12.07

12.06 5 10 15 200

Note: To display more data on the above graph, right click on the x-axis, select Format Axis, and set Maximum to higher value. The size of the graph may also be increased.

ste24102_ch10_410-455.indd 423ste24102_ch10_410-455.indd 423 11/1/13 2:52 PM11/1/13 2:52 PM

Final PDF to printer

424 Chapter Ten Quality Control

LCL = 12.08

1 2 3 4 5

UCL = 12.14

Sample number

M ea

n

12.08

12.09

12.10

12.11

12.12

12.13

12.14

12.15

If an observation on a control chart is on or outside of either control limit, the process is stopped to investigate the cause of that value, such as operator error, machine out of adjust- ment, or similar assignable cause of variation. If no source of error is found, the value could simply be due to chance, and the process will be restarted. However, the output should then be monitored to see if additional values occur that are beyond the control limits, in which case a more thorough investigation would be needed to uncover the source of the problem so that it could be corrected.

If the standard deviation of the process is unknown, another approach is to use the sample range as a measure of process variability. The appropriate formulas for control limits are

UCL

LCL 2

2

x A R

x A R

= =

(10–2)

where

A factor from Table 10.3

R Average of sample ranges 2A =

=

LO10.5 Use and interpret control charts.

x 12.11, .046,R� � and A 2   �  .73 for n   �  4 (from Table 10.3 ). Using Formula 10–2, we can compute the upper and lower limits for a mean control chart:

UCL 12.11 .73(.046) 12.14 minutes

LCL 12.11 .73(.046) 12.08 minutes

= = = =

Except for rounding, these results are the same as those computed in Example 1. Usually that will be the case, but not always.

Range Charts. Range control charts ( R -charts) are used to monitor process dispersion; they are sensitive to changes in process dispersion. Although the underlying sampling distri- bution is not normal, the concepts for the use of range charts are much the same as those for

S O L U T I O N

Range control chart   Control chart used to monitor process dispersion.

e celx mhhe.com/stevenson12e

Refer to the data given in Example 1. In order to use Formula 10–2, we need to compute the grand mean for the data and the average sample range. In Example 1, the grand mean is 12.11. The range for each sample is the difference between the largest and smallest sample values. For the first sample, the largest value is 12.11 and the smallest value is 12.08. The range is the difference between these two values, which is 12.11  �  12.08  �  .03. For Sample 2, the range is 12.15  �  12.10  �  0.05. The other ranges can be computed in similar fashion. The average range is:

(.03 .05 .06 .04 .05)/5 .046.R � � � � � �

E X A M P L E 2

ste24102_ch10_410-455.indd 424ste24102_ch10_410-455.indd 424 11/1/13 2:52 PM11/1/13 2:52 PM

Final PDF to printer

Chapter Ten Quality Control 425

the use of mean charts. Control limits for range charts are found using the average sample range in conjunction with these formulas:

UCL R

LCL R

4

3

D

D

=

= (10–3)

where values of D 3 and D 4 are obtained from Table 10.3 . 1

Using the average range found in Example 2 and Formula 10–3, we can compute the control limits for a range chart.

From Table 10.3 , for n   �  4,  D 4   �  2.28 and D 3   �  0. Thus,

UCL 2.28(.046) .105 minutes

LCL 0(.046) 0 minutes

= = = =

Note that the five sample ranges shown in Example 2 are within these control limits.

E X A M P L E 3

1 If the process standard deviation is known, control limits for a range chart can be calculated using values from Table 10.3 :

� � � �D A n

D

A n LCL

3 , UCL

33

2

4

2

e celx mhhe.com/stevenson12e

S O L U T I O N

Number of Observations in

Sample, n

FACTORS FOR R CHARTS

Factor for x

Chart,  A  2

Lower Control Limit,  D  3

Upper Control Limit,  D  4

2 1.88 0 3.27 3 1.02 0 2.57 4 0.73 0 2.28 5 0.58 0 2.11 6 0.48 0 2.00 7 0.42 0.08 1.92 8 0.37 0.14 1.86 9 0.34 0.18 1.82 10 0.31 0.22 1.78 11 0.29 0.26 1.74 12 0.27 0.28 1.72 13 0.25 0.31 1.69 14 0.24 0.33 1.67 15 0.22 0.35 1.65 16 0.21 0.36 1.64 17 0.20 0.38 1.62 18 0.19 0.39 1.61 19 0.19 0.40 1.60 20 0.18 0.41 1.59

Source: Adapted from Eugene Grant and Richard Leavenworth, Statistical Quality Control, 5th ed. Copyright © 1980 McGraw-Hill Companies, Inc. Used with permission.

TABLE 10.3 Factors for three-sigma control limits for X and R charts

ste24102_ch10_410-455.indd 425ste24102_ch10_410-455.indd 425 11/1/13 2:52 PM11/1/13 2:52 PM

Final PDF to printer

426 Chapter Ten Quality Control

Using Mean and Range Charts. Mean control charts and range control charts provide different perspectives on a process. As we have seen, mean charts are sensitive to shifts in the process mean, whereas range charts are sensitive to changes in process dispersion. Because of this difference in perspective, both types of charts might be used to monitor the same process. The logic of using both is readily apparent in Figure 10.10 . In Figure 10.10A , the mean chart picks up the shift in the process mean, but because the dispersion is not changing, the range

FIGURE 10.10 Mean and range charts used together complement each other

(x -chart does not initially reveal the increase)

(R -chart reveals increase)

UCL

LCL

(x -chart reveals shift)

UCL

LCL

UCL

LCL

UCL

LCL

(Processing mean is shifting upward)

(R -chart does not reveal shift)R -chart

x -chart

R -chart

x -chart

Sampling distribution

Sampling distribution

A.

B.

(Process variability is increasing)

Food inspectors inspect cooked hamburger meat for food safety at McDonald’s.

ste24102_ch10_410-455.indd 426ste24102_ch10_410-455.indd 426 11/1/13 2:52 PM11/1/13 2:52 PM

Final PDF to printer

Chapter Ten Quality Control 427

chart fails to indicate a problem. Conversely, in Figure 10.10B , a change in process dispersion is less apt to be detected by the mean chart than by the range chart. Thus, use of both charts provides more complete information than either chart alone. Even so, a single chart may suf- fice in some cases. For example, a process may be more susceptible to changes in the process mean than to changes in dispersion, so it might be unnecessary to monitor dispersion. Because of the time and cost of constructing control charts, gathering the necessary data, and evaluating the results, only those aspects of a process that tend to cause problems should be monitored.

Once control charts have been set up, they can serve as a basis for deciding when to inter- rupt a process and search for assignable causes of variation. To determine initial control lim- its, one can use the following procedure:

1. Obtain 20 to 25 samples. Compute the appropriate sample statistic(s) for each sample (e.g., mean).

2. Establish preliminary control limits using the formulas.

3. Determine if any points fall outside the control limits.

4. Plot the data on the control chart and check for patterns.

5. If no out-of-control signals are found, assume that the process is in control. If any out- of-control signals are found, investigate and correct causes of variation. Then resume the process and collect another set of observations upon which control limits can be based.

Control Charts for Attributes Control charts for attributes are used when the process characteristic is counted rather than measured. For example, the number of defective items in a sample is counted, whereas the length of each item is measured. There are two types of attribute control charts, one for the fraction of defective items in a sample (a p -chart) and one for the number of defects per unit (a c -chart). A p-chart is appropriate when the data consist of two categories of items. For instance, if glass bottles are inspected for chipping and cracking, both the good bottles and the defective ones can be counted. However, one can count the number of accidents that occur during a given period of time but not the number of accidents that did not occur. Similarly, one can count the number of scratches on a polished surface, the number of bacteria pres- ent in a water sample, and the number of crimes committed during the month of August, but one cannot count the number of nonoccurrences. In such cases, a c-chart is appropriate. See Table 10.4 .

p -Chart. A p-chart is used to monitor the proportion of defective items generated by a pro- cess. The theoretical basis for a p -chart is the binomial distribution, although for large sample sizes, the normal distribution provides a good approximation to it. Conceptually, a p -chart is constructed and used in much the same way as a mean chart.

The centerline on a p -chart is the average fraction defective in the population, p. The stan- dard deviation of the sampling distribution when p is known is

(1 )p p

n p� �

Control limits are computed using the formulas

UCL LCL

p z p z

p p

p p

� � � � � � (10–4)

If p is unknown, which is generally the case, it can be estimated from samples. That estimate, p , replaces p in the preceding formulas, and ˆ p� replaces � p , as illustrated in Example 4.

Note: Because the formula is an approximation, it sometimes happens that the computed LCL is negative. In those instances, zero is used as the lower limit.

p - chart   Control chart for attributes, used to monitor the proportion of defective items in a process.

ste24102_ch10_410-455.indd 427ste24102_ch10_410-455.indd 427 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

428 Chapter Ten Quality Control

An inspector counted the number of defective monthly billing statements of a telephone com- pany in each of 20 samples. Using the following information, construct a control chart that will describe 99.74 percent of the chance variation in the process when the process is in con- trol. Each sample contained 100 statements.

Sample Number of Defectives

Sample Number of Defectives

Sample Number of Defectives

Sample Number of Defectives

1 7 6 11 11 8 16 10

2 10 7 10 12 12 17 8

3 12 8 18 13 9 18 12

4 4 9 13 14 10 19 10

5 9 10 10 15 16 20 21

220

To find z, divide .9974 by 2 to obtain .4987, and using that value, refer to Appendix B, Table A to find z   �  3.00.

Total number of defectives

Total number of observations

220

20(100) .11

ˆ (1 ) .11(1 .11)

100 .0313

p

p p

n p�

� �

= = =

= = =

Control limits are

UCL ( ˆ ) .11 3.00(.0313) .2039

LCL ( ˆ ) .11 3.00(.0313) .0161

p z

p z

p p

p p

� � �

� � �

= = = = = =

Plotting the control limits and the sample fraction defective, you can see that the last value is above the upper control limit. The process would be stopped at that point to find and correct the possible cause. Then new data would be collected to establish new control limits. If no cause is found, this could be due to chance. The new limits would remain, but future output would be monitored to assure the process remains in control.

e celx mhhe.com/stevenson12e

E X A M P L E 4

S O L U T I O N

The following tips should help you select the type of control chart, a p - chart or a c - chart, that is appropriate for a particular application:

Use a p - chart: Use a c - chart:

1. When observations can be placed into one of two categories. Examples include items (observations) that can be classified as

a. Good or bad. b. Pass or fail. c. Operate or don’t operate. 2. When the data consist of multiple samples

of n observations each (e.g., 15 samples of n   �  20 observations each).

When only the number of occurrences per unit of measure can be counted; nonoccurrences cannot be counted. Examples of occurrences and units of measure include

a. Scratches, chips, dents, or errors per item. b. Cracks or faults per unit of distance (e.g., meters,

miles). c. Breaks or tears, per unit of area (e.g., square yard,

square meter). d. Bacteria or pollutants per unit of volume

(e.g., gallon, cubic foot, cubic yard). e. Calls, complaints, failures, equipment

breakdowns, or crimes per unit of time (e.g., hour, day, month, year).

TABLE 10.4 p - chart or c - chart?

ste24102_ch10_410-455.indd 428ste24102_ch10_410-455.indd 428 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

Chapter Ten Quality Control 429

c - Chart. When the goal is to control the number of occurrences (e.g., defects) per unit, a c - chart is used. Units might be automobiles, hotel rooms, typed pages, or rolls of carpet. The underlying sampling distribution is the Poisson distribution. Use of the Poisson distribution assumes that defects occur over some continuous region and that the probability of more than one defect at any particular point is negligible. The mean number of defects per unit is c and the standard deviation is .c For practical reasons, the normal approximation to the Poisson is used. The control limits are

UCL

LCL

c z c

c z c

c

c

=

= (10–5)

If the value of c is unknown, as is generally the case, the sample estimate, ,c is used in place of c, using Number of defects Number of samples.c � �

c - chart   Control chart for attributes, used to monitor the number of defects per unit.

LCL = .0161

.24

.22

.20

.18

.16

.14

.12

.10

.08

.06

.04

.02

.00 2 4 6 8 10 12 14 16 18 20

UCL = .2039

Sample number

Fr ac

ti o

n d

ef ec

ti ve

Out of control

Rolls of coiled wire are monitored using a c - chart. Eighteen rolls have been exam- ined, and the number of defects per roll has been recorded in the following table. Is the process in control? Plot the values on a control chart using three standard deviation control limits.

E X A M P L E 5

e celx mhhe.com/stevenson12e

ste24102_ch10_410-455.indd 429ste24102_ch10_410-455.indd 429 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

430 Chapter Ten Quality Control

Sample

Number of Defects

Sample

Number of Defects

Sample

Number of Defects

1 3 7 4 13 2

2 2 8 1 14 4

3 4 9 2 15 2

4 5 10 1 16 1

5 1 11 3 17 3

6 2 12 4 18 1

45

LCL = 0

c = 2.5

8

6

4

2

0 2 4 6 8 10 12 14 16 18

UCL = 7.24

Sample number

D ef

ec ts

p er

u n

it

S O L U T I O N 45/18 2.5 Average number of defects per coilc � � � UCL 3 2.5 3 2.5 7.24

LCL 3 2.5 3 2.5 2.24 0

c c

c c

c

c

� �

� � �

= = =

= = = →

When the computed lower control limit is negative, the effective lower limit is zero. In such cases, if a control chart point is zero, it should not be deemed to be out of control. The calculation sometimes produces a negative lower limit due to the use of the normal distribu- tion to approximate the Poisson distribution: The normal is symmetrical, whereas the Poisson is not symmetrical when c is close to zero.

Note that if an observation falls below the lower control limit on a p - chart or a c - chart, the cause should be investigated, just as it would be for a mean or range chart, even though such a point would imply that the process is exhibiting better than expected quality. It may turn out to be the result of an undesirable overuse of resources. On the other hand, it may lead to a discovery that can improve the quality of the process.

Managerial Considerations Concerning Control Charts Using control charts adds to the cost and time needed to obtain output. Ideally a process is so good that the desired level of quality could be achieved without the use of any control charts. The best organizations strive to reach this level, but many are not yet there, so they employ control charts at various points in their processes. In those organizations, managers must make a number of important decisions about the use of control charts:

1. At what points in the process to use control charts.

2. What size samples to take.

3. What type of control chart to use (i.e., variables or attribute).

4. How often should samples be taken.

ste24102_ch10_410-455.indd 430ste24102_ch10_410-455.indd 430 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

Chapter Ten Quality Control 431

The decision about where to use control charts should focus on those aspects of the process that (1) have a tendency to go out of control and (2) are critical to the successful operation of the product or service (i.e., variables that affect product or service characteristics).

Sample size is important for two reasons. One is that cost and time are functions of sample size; the greater the sample size, the greater the cost to inspect those items (and the greater the lost product if destructive testing is involved) and the longer the process must be held up while waiting for the results of sampling. The second reason is that smaller samples are more likely to reveal a change in the process than larger samples because a change is more likely to take place within the large sample, but between small samples. Consequently, a sample statistic such as the sample mean in the large sample could combine both “before-change” and “after-change” observations, whereas in two smaller samples, the first could contain “before” observations and the second “after” observations, making detection of the change more likely.

In some instances, a manager can choose between using a control chart for variables (a mean chart) and a control chart for attributes (a p - chart). If the manager is monitoring the diameter of a drive shaft, either the diameter could be measured and a mean chart used for control, or the shafts could be inspected using a go, no-go gauge —which simply indicates whether a particular shaft is within specification without giving its exact dimensions—and a p - chart could be used. Measuring is more costly and time-consuming per unit than the yes-no inspection using a go, no-go gauge, but because measuring supplies more information than merely counting items as good or bad, one needs a much smaller sample size for a mean chart than a p - chart. Hence, a manager must weigh the time and cost of sampling against the information provided.

Sampling frequency can be a function of the stability of a process and the cost to sample.

Run Tests Control charts test for points that are too extreme to be considered random (e.g., points that are outside of the control limits). However, even if all points are within the control limits, the data may still not reflect a random process. In fact, any sort of pattern in the data would sug- gest a nonrandom process. Figure 10.11 illustrates some patterns that might be present.

FIGURE 10.11 Some examples of nonrandom patterns in control chart plots

UCL

UCL

UCL

UCL

LCL

LCL

LCL

LCL

Trend Sustained upward or downward movement

Cycles

A wave pattern

Bias Too many observations on one side of the center line

Too much dispersion

The values are too spread out

ste24102_ch10_410-455.indd 431ste24102_ch10_410-455.indd 431 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

432 Chapter Ten Quality Control

Analysts often supplement control charts with a run test, which checks for patterns in a sequence of observations. This enables an analyst to do a better job of detecting abnormalities in a process and provides insights into correcting a process that is out of control. A variety of run tests are available; this section describes two that are widely used.

When a process is stable or in statistical control, the output it generates will exhibit random variability over a period of time. The presence of patterns, such as trends, cycles, or bias in the output indicates that assignable, or nonrandom, causes of variation exist. Hence, a pro- cess that produces output with such patterns is not in a state of statistical control. This is true even though all points on a control chart may be within the control limits. For this reason, it is usually prudent to subject control chart data to run tests to determine whether patterns can be detected.

A run is defined as a sequence of observations with a certain characteristic, followed by one or more observations with a different characteristic. The characteristic can be anything that is observable. For example, in the series A A A B, there are two runs: a run of three As followed by a run of one B. Underlining each run helps in counting them. In the series A A B B B A, the underlining indicates three runs.

Two useful run tests involve examination of the number of runs up and down and runs above and below the median. 2 In order to count these runs, the data are transformed into a series of Us and Ds (for up and down ) and into a series of As and Bs (for above and below the median). Consider the following sequence, which has a median of 36.5. The first two values are below the median, the next two are above it, the next to last is below, and the last is above. Thus, there are four runs:

In terms of up and down, there are three runs in the same data. The second value is up from the first value, the third is up from the second, the fourth is down from the third, and so on:

(The first value does not receive either a U or a D because nothing precedes it.) If a plot is available, the runs can be easily counted directly from the plot, as illustrated in

Figures 10.12 and 10.13 .

Run test   A test for patterns in a sequence.

LO10.6 Perform run tests to check for nonrandomness in process output.

Run   Sequence of observations with a certain characteristic.

25 29 42 40 35 38 B B A A B A

25 29 42 40 35 38 — U U D D U

FIGURE 10.13 Counting up/down runs

U U D U D U D U U D

U U

U

U

U U

D D D D

(8 runs)

FIGURE 10.12 Counting above/below median runs

(7 runs) B A A B A B B B A A B

2 The median and mean are approximately equal for control charts. The use of the median depends on its ease of determination; use the mean instead of the median if it is given.

ste24102_ch10_410-455.indd 432ste24102_ch10_410-455.indd 432 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

Chapter Ten Quality Control 433

To determine whether any patterns are present in control chart data, one must transform the data into both As and Bs and Us and Ds, and then count the number of runs in each case. These numbers must then be compared with the number of runs that would be expected in a completely random series. For both the median and the up/down run tests, the expected num- ber of runs is a function of the number of observations in the series. The formulas are

( ) 2

1medE r N

� � (10–6a)

( ) 2 1

3 /E r

N u d �

� (10–7a)

where N is the number of observations or data points, and E ( r ) is the expected number of runs. The actual number of runs in any given set of observations will vary from the expected

number, due to chance and any patterns that might be present. Chance variability is measured by the standard deviation of runs. The formulas are

1

4 med

N � �

� (10–6b)

16 29

90 /

N u d� �

� (10–7b)

Distinguishing chance variability from patterns requires use of the sampling distributions for median runs and up/down runs. Both distributions are approximately normal. Thus, for example, 95.5 percent of the time a random process will produce an observed number of runs within two standard deviations of the expected number. If the observed number of runs falls in that range, there are probably no nonrandom patterns; for observed numbers of runs beyond such limits, we begin to suspect that patterns are present. Too few or too many runs can be an indication of nonrandomness.

In practice, it is often easiest to compute the number of standard deviations, z, by which an observed number of runs differs from the expected number. This z value would then be compared to the value �  2 ( z for 95.5 percent) or some other desired value (e.g., �  1.96 for 95 percent, �  2.33 for 98 percent). A test z that exceeds the desired limits indicates patterns are present. (See Figure 10.14 .) The computation of z takes the form

Observed number of runs Expected number of runs

Standard deviation of number of runs testz �

For the median and up/down tests, one can find z using these formulas:

Median:

[( /2) 1]

( 1)/4 z

r N

N �

� �

� (10–8)

Up and down:

[(2 1)/3]

(16 29)/90 z

r N

N �

� �

� (10–9)

FIGURE 10.14 A sampling distribution for runs is used to distinguish chance variation from patterns

Acceptable number of runs

z = –2 z = 0 z = +2

Too few runs Too many runs

ste24102_ch10_410-455.indd 433ste24102_ch10_410-455.indd 433 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

434 Chapter Ten Quality Control

where

N   �  Total number of observations

r   �  Observed number of runs of either As and Bs or Us and Ds, depending on which test is involved.

It is desirable to apply both run tests to any given set of observations because each test is different in terms of the types of patterns it can detect. Sometimes both tests will pick up a certain pattern, but sometimes only one will detect nonrandomness. If either does, the impli- cation is that some sort of nonrandomness is present in the data.

Twenty sample means have been taken from a process. The means are shown in the following table. Use median and up/down run tests with z   �  2 to determine if assignable causes of varia- tion are present. Assume the median is 11.0.

E X A M P L E 6

e celx mhhe.com/stevenson12e

S O L U T I O N The means are marked according to above/below the median and up/down. The solid lines represent the runs.

Sample A/B Mean U/D Sample A/B Mean U/D

1 B 10.0 — 11 | B 10.7 | D

2 B 10.4 | U 12 | A 11.3 | U

3 B 10.2 | D 13 | B 10.8 | D

4 | A 11.5 | U 14 A 11.8 | U

5 | B 10.8 | D 15 A 11.2 | D

6 A 11.6 | U 16 A 11.6 | U

7 A 11.1 | D 17 A 11.2 D

8 A 11.2 | U 18 B 10.6 D

9 B 10.6 | D 19 B 10.7 U

10 B 10.9 | U 20 | A 11.9 U

A/B: 10 runs U/D: 17 runs

The expected number of runs for each test is

( ) 2

1 20

2 1 11

( ) 2 1

3

2(20) 1

3 13

med

/

E r N

E r N

u d

� �

� �

= = =

= = =

The standard deviations are

1

4

20 1

4 2.18

16 29

90

16(20) 29

90 1.80

med

/

N

N u d

� � �

� � �

= = =

= = =

The z test values are 10 11

2.18 .46

17 13

1.80 2.22

med

/

z

zu d

� �

� �

= =

= =

Although the median test does not reveal any pattern, because its z test value is within the range �  2, the up/down test does; its value exceeds � 2. Consequently, nonrandom variations are probably present in the data and, hence, the process is not in control.

ste24102_ch10_410-455.indd 434ste24102_ch10_410-455.indd 434 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

Chapter Ten Quality Control 435

Using Control Charts and Run Tests Together Although for instructional purposes most of the examples, solved problems, and problems focus on either control charts or run tests, ideally both control charts and run tests should be used to analyze process output, along with a plot of the data. The procedure involves the following three steps:

1. Compute control limits for the process output.

a. Determine which type of control chart is appropriate (see Figure 10.18 ).

b. Compute control limits using the appropriate formulas. If no probability is given, use a value of z   �  2.00 to compute the control limits.

c. If any sample statistics fall outside of the control limits, the process is not in control. If all values are within the control limits, proceed to Step 2.

2. Conduct median and up/down run tests. Use z   �   �  2.00 for comparing the test scores. If either or both test scores are not within z   �   �  2.00, the output is probably not ran- dom. If both test scores are within z   �   �  2.00, proceed to Step 3.

3. Note: If you are at this point, there is no indication so far that the process output is non- random. Plot the sample data and visually check for patterns (e.g., cycling). If you see a pattern, the output is probably not random. Otherwise, conclude the output is random and that the process is in control.

What Happens When a Process Exhibits Possible Nonrandom Variation? Nonrandom variation is indicated when a point is observed that is outside the control lim- its, or a run test produces a large z - value (e.g., greater than �  1.96). Managers should have response plans in place to investigate the cause. It may be a false alarm (i.e., a Type I error), or it may be a real indication of the presence of an assignable cause of variation. If it appears to be a false alarm, resume the process but monitor it for a while to confirm this. If an assign- able cause can be found, it needs to be addressed. If it is a good result (e.g., an observation below the lower control limit of a p - chart, a c - chart, or a range chart would indicate unusu- ally good quality), it may be possible to change the process to achieve similar results on an ongoing basis. The more typical case is that there is a problem that needs to be corrected. Operators can be trained to handle simple problems, while teams may be needed to handle more complex problems. Problem solving often requires the use of various tools, described in Chapter 9, to find the root cause of the problem. Once the cause has been found, changes can be made to reduce the chance of recurrence.

10.4 PROCESS CAPABILITY Once the stability of a process has been established (i.e., no nonrandom variations are pres- ent), it is necessary to determine if the process is capable of producing output that is within an acceptable range. The variability of a process becomes the focal point of the analysis.

Three commonly used terms refer to the variability of process output. Each term relates to a slightly different aspect of that variability, so it is important to differentiate these terms.

Specifications or tolerances are established by engineering design or customer require- ments. They indicate a range of values in which individual units of output must fall in order to be acceptable.

Specifications   A range of acceptable values established by engineering design or customer requirements.

If ties occur in either test (e.g., a value equals the median or two values in a row are the same), assign A/B or U/D in such a manner that that z test is as large as possible. If z test still does not exceed �  2 ( �  1.96, etc.), you can be reasonably confident that a conclusion of random- ness is justified.

ste24102_ch10_410-455.indd 435ste24102_ch10_410-455.indd 435 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

436 Chapter Ten Quality Control

Control limits are statistical limits that reflect the extent to which sample statistics such as means and ranges can vary due to randomness alone.

Process variability reflects the natural or inherent (i.e., random) variability in a process. It is measured in terms of the process standard deviation.

Control limits and process variability are directly related: Control limits are based on sampling variability, and sampling variability is a function of process variability. On the other hand, there is no direct link between specifications and either control limits or process variability. They are specified in terms of the output of a product or service, not in terms of the process by which the output is generated. Hence, in a given instance, the output of a process may or may not conform to specifications, even though the process may be statistically in control. That is why it is also necessary to take into account the capability of a process. The term process capability refers to the inherent variability of process output relative to the variation allowed by the design specifica- tions. The following section describes capability analysis.

Capability Analysis Capability analysis is performed on a process that is in control (i.e., the process exhibits only random variation) for the purpose of determining if the range of variation is within design specifications that would make the output acceptable for its intended use. If it is within the specifications, the process is said to be “capable.” If it is not, the manager must decide how to correct the situation.

Consider the three cases illustrated in Figure 10.15 . In the first case, process capability and output specifications are well matched, so that nearly all of the process output can be expected to meet the specifications. In the second case, the process variability is much less than what is called for, so that virtually 100 percent of the output should be well within tolerance. In the third case, however, the specifications are tighter than what the process is capable of, so that even when the process is functioning as it should, a sizable percentage of the output will fail to meet the specifications. In other words, the process could be in control and still generate unacceptable output. Thus, we cannot automatically assume that a process that is in control will provide desired output. Instead, we must specifically check whether a process is capable of meeting specifications and not simply set up a control chart to monitor it. A process should be both in control and within specifications before production begins—in essence, “Set the toaster correctly at the start. Don’t burn the toast and then scrape it!”

Process variability   Natural or inherent variability in a process.

Process capability   The inherent variability of process output relative to the variation allowed by the design specification.

To maximize production of a machine run in a paper mill, the machine’s alignment must be correct. If not, performance and quality will be affected, which could result in machine downtime and expensive repairs. The on-board processor calculates the position of the paper in relationship to the machine datum. Two points are then measured on the roller. With the simple press of a button the operator is provided with any deviations on a display panel.

ste24102_ch10_410-455.indd 436ste24102_ch10_410-455.indd 436 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

Chapter Ten Quality Control 437

In instances such as case C in Figure 10.15 , a manager might consider a range of possible solutions: (1) redesign the process so that it can achieve the desired output, (2) use an alterna- tive process that can achieve the desired output, (3) retain the current process but attempt to eliminate unacceptable output u-sing 100 percent inspection, and (4) examine the specifica- tions to see whether they are necessary or could be relaxed without adversely affecting cus- tomer satisfaction.

Obviously, process variability is the key factor in process capability. It is measured in terms of the process standard deviation. To determine whether the process is capable, com- pare �  3 standard deviations (i.e., 6 standard deviations) of the process to the specifications for the process. For example, suppose the ideal length of time to perform a service is 10 min- utes, and an acceptable range of variation around this time is �  1 minute. If the process has a standard deviation of .5 minute, it would not be capable because �  3 standard deviations would be �  1.5 minutes, exceeding the specification of �  1 minute.

FIGURE 10.15 Process capability and specifications may or may not match

Lower specification

Upper specification

Lower specification

Upper specification

Lower specification

Upper specification

A. Process variability seems to just match specifications

B. Process variability well within specifications

C. Process variability exceeds specifications

A manager has the option of using any one of three machines for a job. The processes and their standard deviations are listed below. Determine which machines are capable if the speci- fications are 10.00 mm and 10.80 mm.

Process Standard Deviation (mm)

A .13

B .08

C .16

E X A M P L E 7

e celx mhhe.com/stevenson12e

S O L U T I O N Determine the extent of process variability (the process width) of each process (i.e., six standard deviations) and compare that value to the specification difference of .80 mm.

Process Standard Deviation (mm) Process Width

A .13 .78

B .08 .48

C .16 .96

C p To assess the capability of a machine or process, a capability index can be computed using the following formula:

Process capability index, Specification width

Process width Upper specification Lower specification

6 of the process

Cp

=

=

(10–10)

For a process to be deemed to be capable, it must have a capability index of at least 1.00. However, an index of 1.00 would mean that the process is just barely capable. The current trend is to aim for an index of at least 1.33. An index of 1.33 allows some leeway. Consider driving a car into a garage that has a door opening that is 1 inch wider than the car versus driv- ing into a garage where the door opening is 20 inches wider than the car, and you’ll understand

capability index   Used to assess the ability of a process to meet specifications.

LO10.7 Assess process capability.

ste24102_ch10_410-455.indd 437ste24102_ch10_410-455.indd 437 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

438 Chapter Ten Quality Control

why this book and many companies use 1.33 as the standard for judging process capability instead of 1.00. So use 1.33 as the standard to achieve in judging process capability.

An index of 1.00 implies about 2700 parts per million (ppm) can be expected to not be within the specifications, while an index of 1.33 implies only about 30 ppm won’t be within specs. Moreover, the greater the capability index, the greater the probability that the output of a process will fall within design specifications.

FIGURE 10.16 Three-sigma versus six-sigma capability

Lower specification

Upper specification

Three-sigma capability

�3� �2� �1� mean �1� �2� �3�

Lower specification

Upper specification

Six-sigma capability

�6� �3� mean �6��3�

Compute the process capability index for each process in Example 7. E X A M P L E 8

S O L U T I O N The specification width in Example 7 is .80 mm. Hence, to determine the capability index for each process, divide .80 by the process width (i.e., six standard deviations) of each machine. The results are shown in the following table:

Process Standard Deviation (mm) Process Capability  C  P

A .13 .78 .80/.78  �  1.03

B .08 .48 .80/.48  �  1.67

C .16 .96 .80/.96  �  0.83

We can see that only process B is capable because its index is not less than 1.33. (See Figure 10.15 for a visual portrayal of these results.)

For processes that are not capable, several options might be considered, such as perform- ing 100 percent inspection to weed out unacceptable items, improving the process to reduce variability, switching to a capable process, outsourcing, etc.

The Motorola Corporation is well known for its use of the term six sigma, which refers to its goal of achieving a process variability so small that the design specifications represent six standard deviations above and below the process mean. That means a process capability index equal to 2.00, resulting in an extremely small probability of getting any output not within the design specifications. This is illustrated in Figure 10.16 .

To get an idea of how a capability index of 2.00 compares to an index of, say, 1.00 in terms of defective items, consider that if the U.S. Postal Service had a capability index of 1.00 for delivery errors of first-class mail, this would translate into about 10,000 misdelivered pieces per day; if the capability index was 2.00, that number would drop to about 1,000 pieces a day.

Care must be taken when interpreting the C p index, because its computation does not involve the process mean. Unless the target value (i.e., process mean) is centered between the upper and lower specifications, the C p index can be misleading. For example, suppose the specifications are 10 and 11, and the standard deviation of the process is equal to .10. The C p would seem to be very favorable:

11 10

6(.10) 1.67

� �

ste24102_ch10_410-455.indd 438ste24102_ch10_410-455.indd 438 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

Chapter Ten Quality Control 439

However, suppose that the process mean is 12, with a standard deviation of .10;  �  3 stan- dard deviations would be 11.70 to 12.30, so it is very unlikely that any of the output would be within the specifications of 10 to 11!

There are situations in which the target value is not centered between the specifications, either intentionally or unavoidably. In such instances, a more appropriate measure of process capability is the C pk index, because it does take the process mean into account.

C pk If a process is not centered, a slightly different measure is used to compute its capabil- ity. This index is represented by the symbol C pk . It is computed by finding the difference between each of the specification limits and the mean, identifying the smaller difference, and dividing that difference by three standard deviations of the process. Thus, C pk is equal to the smaller of

Upper specification Process mean

3

� (10–11)

and Process mean Lower specification

3

A process has a mean of 9.20 grams and a standard deviation of .30 gram. The lower speci- fication limit is 7.50 grams and the upper specification limit is 10.50 grams. Compute C pk .

E X A M P L E 9

S O L U T I O N 1. Compute the index for the lower specification: Process mean Lower specification

3

9.20 7.50

3(.30)

1.70

.90 1.89

� �

� � �

2. Compute the index for the upper specification: Upper specification Process mean

3

10.50 9.20

3(.30)

1.30

.90 1.44

� �

� � �

The smaller of the two indexes is 1.44, so this is the C pk . Because the C pk is more than 1.33, the process is capable.

You might be wondering why a process wouldn’t be centered as a matter of course. One reason is that only a range of acceptable values, not a target value, may be specified. A more compelling reason is that the cost of nonconformance is greater for one specification limit than it is for nonconformance for the other specification limit. In that case, it would make sense to have the target value be closer to the spec that has the lower cost of nonconformance. This would result in a noncentered process.

Improving Process Capability Improving process capability requires changing the process target value and/or reducing the process variability that is inherent in a process. This might involve simplifying, standardiz- ing, making the process mistake-proof, upgrading equipment, or automating. See Table 10.5 for examples.

Improved process capability means less need for inspection, lower warranty costs, fewer complaints about service, and higher productivity. For process control purposes, it means nar- rower control limits.

ste24102_ch10_410-455.indd 439ste24102_ch10_410-455.indd 439 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

440 Chapter Ten Quality Control

Taguchi Loss Function Gnocchi Taguchi, a Japanese quality expert, holds a nontraditional view of what constitutes poor quality, and hence the cost of poor quality. The traditional view is that as long as output is within specifications, there is no cost. Taguchi believes that any deviation from the target value represents poor quality, and that the farther away from target a deviation is, the greater the cost. Figure 10.17 illustrates the two views. The implication for Taguchi is that reducing the variation inherent in a process (i.e., increasing its capability ratio) will result in lowering the cost of poor quality, and consequently, the loss to society.

Limitations of Capability Indexes There are several risks of using a capability index:

1. The process may not be stable, in which case a capability index is meaningless.

2. The process output may not be normally distributed, in which case inferences about the fraction of output that isn’t acceptable will be incorrect.

3. The process is not centered but the C p index is used, giving a misleading result.

FIGURE 10.17 Taguchi and traditional views of the cost of poor quality

Lower spec

Upper spec

Target 0

Cost Traditional cost function

Taguchi cost function

10.5 OPERATIONS STRATEGY

Quality is a major consideration for virtually all customers, so achieving and maintaining qual- ity standards is of strategic importance to all business organizations. Quality assurance and product and service design are two vital links in the process. Organizations should continually seek to increase the capability of the processes they use, so that they can move from a position of using inspection or extensive use of control charts to achieve desired levels of quality to one where quality is built into products and processes, so that little or no effort is needed to assure quality. Processes that exhibit evidence of nonrandomness, or processes that are deemed to not be capable, should be viewed as opportunities for continuous process improvement.

Method Examples

Simplify Eliminate steps, reduce the number of parts, use modular design Standardize Use standard parts, standard procedures Make mistake-proof Design parts that can only be assembled the correct way; have simple checks to

verify a procedure has been performed correctly Upgrade equipment Replace worn-out equipment; take advantage of technological improvements Automate Substitute automated processing for manual processing

TABLE 10.5 Process capability improvement

ste24102_ch10_410-455.indd 440ste24102_ch10_410-455.indd 440 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

Chapter Ten Quality Control 441

It’s estimated that more than 7,000 hospital patients die each year because of drug errors, and many others suffer ill effects from being given the wrong drug or the wrong dosage. Some hospitals are using bar codes attached to patients’ wristbands that allow hospital personnel who administer drugs to patients to electronically check to make sure the drug and dosage are appropriate. Before administering a drug, the doctor or nurse scans the bar code attached to the patient to see what drug is needed and when, and then the drug’s bar code is scanned to verify that the medication is correct.

But bar codes are not foolproof, as a recent study of hospitals showed. Nurses may develop a workaround that involves using photo copies of a group of patients’ bar codes which are then used to obtain drugs for the entire group. The nurse would then have a tray that may contain drugs of different dosages intended for different patients. At that point, the bar code protection has been circumvented.

Questions 1. Why are bar codes being used in hospitals? 2. What action would you suggest to avoid the problem of workarounds?

Source: Based on “Bar Codes Might Cut Drug Errors,” Rochester Democrat and Chronicle, March 14, 2003, p. 9A; and “Bar Codes Are Not Foolproof in Hospitals, says Study,” Rochester Democrat and Chronicle, July 3, 2008, p. 3A.

READING Bar Codes Might Cut Drug Errors in Hospitals

This chapter describes inspection and statistical process control. Inspection means examining the output of a process to determine whether it is acceptable. Key issues in inspection include where to inspect in the process, how often to inspect, and whether to inspect on-site or in a laboratory.

Statistical process control focuses on detecting departures from randomness in a process. Two basic tools of process control are control charts and run tests. Figure 10.18 gives an overview of quality control. The gen- eral theory of control charts is discussed, and four types of control charts—two for variables and two for attri- butes—and two types of run tests are described in the chapter. The chapter ends with a discussion of process capability. Process capability studies are used to determine if the output of a process will satisfy specifica- tions. They can provide valuable information for managers in terms of reducing costs and avoiding problems created by generating output that is not within specifications. Table 10.6 provides a summary of formulas.

SUMMARY

1. All processes exhibit random variation. Quality control’s purpose is to identify a process that also exhibits nonrandom (correctable) variation on the basis of sample statistics (e.g., sample means) obtained from the process.

2. Control charts and run tests can be used to detect nonrandom variation in sample statistics. It is also advisable to plot the data to visually check for patterns.

3. If a process does not exhibit nonrandom variation, its capability to produce output that meets speci- fications can be assessed.

KEY POINTS

assignable variation, 418 attributes, 422 capability index, 437 c - chart, 429 central limit theorem, 418 control chart, 420 control limits, 421 inspection, 412

mean control chart, 422 p - chart, 427 process capability, 436 process variability, 436 quality control, 411 quality of conformance, 417 random variation, 417 range control chart, 424

run, 432 run test, 432 sampling distribution, 418 specifications, 435 statistical process control (SPC), 417 Type I error, 421 Type II error, 421 variables, 422

KEY TERMS

ste24102_ch10_410-455.indd 441ste24102_ch10_410-455.indd 441 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

442 Chapter Ten Quality Control

FIGURE 10.18 Overview of quality control

Appraisal

Inspection

Run testsControl charts

Median test

Up/down test

Quality control

Prevention

Statistical process control

Measurement Data: x-chart for means R-chart for ranges

Count Data: p-chart for fraction defective c-chart for number of defects

TABLE 10.6 Summary of formulas CONTROL CHARTS

Name Usage Control Limits

Mean, x-bar charg Measurement data. Use for average.

� �

�x z n

x A Ror 2

n   �  sample size

Range, R chart Measurement data. Use for range or dispersion.

D R D RUCL , LCL4 3� �

Fraction defective, p chart Count data. Use when both the “good” and “bad” can be counted.

p z p p

n (1 )

� �

n   �  sample size

Number of defects, c chart Count data. Use when only the “occurrences” can be counted.

c z c�

RUN TESTS

NUMBER OF RUNS

Name Observed Expected Standard Deviation Z

Median r

N 2

1�

N 1 4

r N N [( /2) 1]

( 1)/4

� �

Up/down r

N2 1 3

N16 29 90

r N N [(2 1)/3]

(16 29)/90

� �

� N   �  number of observations

(continued )

ste24102_ch10_410-455.indd 442ste24102_ch10_410-455.indd 442 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

Chapter Ten Quality Control 443

PROCESS CAPABILITY

Name Symbol Formula

Capability index for a centered process

C p

Specification width

6 of process�

Capability index for a noncentered process

C pk

Smaller of

Mean Lower specification

3 Upper specification Mean

3

⎨ ⎪⎪

⎩ ⎪ ⎪

TABLE 10.6 (concluded )

SOLVED PROBLEMS

Process distribution and sampling distribution. An industrial process that makes 3-foot sections of plastic pipe produces pipe with an average inside diameter of 1 inch and a standard deviation of .05 inch.

a. If you randomly select one piece of pipe, what is the probability that its inside diameter will exceed 1.02 inches, assuming the population is normal?

b. If you select a random sample of 25 pieces of pipe, what is the probability that the sample mean will exceed 1.02 inches?

Problem 1

Solution 1.00, .05 � � �

a. 1.02 1.00

.05 .40z

x �

� �

� �

Using Appendix B, Table A, P ( z  > .4)  �  .5000  �  .1554  �  .3446

m = 1.00 1.02

.3446

Population distribution

b. /

1.02 1.00

.05/ 25 2.00z

x

n �

� �

� �

Using Appendix B, Table A, P ( z  > 2.00)  �  .5000  �  .4772  �  .0228

m = 1.00 1.02

Sampling distribution of means

.0228

ste24102_ch10_410-455.indd 443ste24102_ch10_410-455.indd 443 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

444 Chapter Ten Quality Control

Control charts for means and ranges. Processing times for new accounts at a bank are shown in the following table. Five samples of four observations each have been taken. Use the sample data in conjunction with Table 10.3 to construct upper and lower control limits for both a mean chart and a range chart. Do the results suggest that the process is in control?

Sample 1 Sample 2 Sample 3 Sample 4 Sample 5

10.2 10.3 9.7 9.9 9.8

9.9 9.8 9.9 10.3 10.2

9.8 9.9 9.9 10.1 10.3

10.1 10.4 10.1 10.5 9.7

Totals 40.0 40.4 39.6 40.8 40.0

Solution a. Determine the mean and range of each sample.

, Range Largest Smallestx x

n �

� �

Sample Mean Range

1 40.0/4  �  10.0 10.2  �  9.8  �  .4

2 40.4/4  �  10.1 10.4  �  9.8  �  .6

3 39.6/4  �  9.9 10.1  �  9.7  �  .4

4 40.8/4  �  10.2 10.5  �  9.9  �  .6

5 40.0/4  �  10.0 10.3  �  9.7  �  .6

b. Compute the average mean and average range:

10.0 10.1 9.9 10.2 10.0

5

50.2

5 10.04

.4 .6 .4 .6 .6

5

2.6

5 .52

x

R

� � � � �

� �

� � � � �

� �

c. Obtain factors A 2 ,  D 4 , and D 3 from Table 10.3 for n   �  4:  A 2   �  .73,  D 4   �  2.28,  D 3   �  0.

d. Compute upper and lower limits: UCL 10.04 .73(.52) 10.422x A Rx � � � � �

LCL 2 10.04 .73(.52) 9.66

UCL 4 2.28(.52) 1.19

LCL 3 0(.52) 0

x x A R

R D R

R D R

� � � � �

� � �

� � �

e. Verify that points are within limits. (If they were not, the process would be investigated to correct assignable causes of variation.) The smallest sample mean is 9.9, and the largest is 10.2. Both are well within the control limits.

Similarly, the largest sample range is .6, which is also within the control limits. Hence, the results suggest that the process is in control. Note, however, that for illustrative purposes, the number of samples is deliberately small; 20 or more samples would give a clearer indication of control limits and whether the process is in control.

Type I error (alpha risk). After several investigations of points outside control limits revealed noth- ing, a manager began to wonder about the probability of a Type I error for the control limits used ( z   �  1.90).

a. Determine the alpha risk (i.e., P (Type I error)) for this value of z.

b. What z would provide an alpha risk of about 2 percent?

Problem 3

Problem 2

ste24102_ch10_410-455.indd 444ste24102_ch10_410-455.indd 444 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

Chapter Ten Quality Control 445

a. Using Appendix B, Table A, find that the area under the curve between z   �  0 and z   �   � 1.90 is .4713. Therefore, the area (probability) of values within   � 1.90 to �1.90 is   2 (.4713)  �  .9426, and the area beyond these values is 1  �  .9426  �  .0574. Hence, the alpha risk is 5.74 percent.

b. The alpha risk (Type I error probability) is always specified as an area in the tail(s) of a distribu- tion. With control charts, you use two-sided control limits. Consequently, half of the risk lies in each tail. Hence, the area in the right tail is 1 percent, or .0100. This means that .4900 should be the area under the curve between z   �  0 and the value of z you are looking for. The closest value is .4901 for z   �  2.33. Thus, control limits based on z   �   �  2.33 provide an alpha risk of about 2 percent.

Solution

Problem 4 p - chart and c - chart. Using the appropriate control chart, determine two-sigma control limits for each case:

a. An inspector found an average of 3.9 scratches in the exterior paint of each of the automo- biles being prepared for shipment to dealers.

b. Before shipping lawn mowers to dealers, an inspector attempts to start each mower and notes any that do not start on the first try. The lot size is 100 mowers, and an average of 4 did not start (4 percent).

Solution The choice between these two types of control charts relates to whether two types of results can be counted ( p - chart) or whether only occurrences can be counted ( c - chart).

a. The inspector can only count the scratches that occurred, not the ones that did not occur. Consequently, a c - chart is appropriate. The sample average is 3.9 scratches per car. Two- sigma control limits are found using the formulas

UCL

LCL

c z c

c z c

=

=

where c  �  3.9 and z   �  2. Thus, UCL 3.9 2 3.9 7.85 scratches

LCL 3.9 2 3.9 .05, so the lower limit is 0 scratches

� �

= =

= =

( Note: Round to zero only if the computed lower limit is negative.)

b. The inspector can count both the lawn mowers that started and those that did not start. Con- sequently, a p - chart is appropriate. Two-sigma control limits can be computed using the following: UCL

(1 )

LCL (1 )

p z p p

n

p z p p

n

� �

� �

=

=

where

.04

100

2

p

n

z

= = =

Thus, UCL .04 2

.04(96)

100 .079

LCL .04 2 .04(.96)

100 .001

= =

= =

ste24102_ch10_410-455.indd 445ste24102_ch10_410-455.indd 445 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

446 Chapter Ten Quality Control

Run tests. The number of defective items per sample for 11 samples is shown below. Determine if nonrandom patterns are present in the sequence.

Problem 5

Sample A/B Number of Defectives U/D

1 | A 22 —

2 B 17 | D

3 B 19 U

4 | A 25 U

5 B 18 | D

6 B 20 U

7 tie 21 U

8 | B 17 | D

9 A 23 | U

10 A 23 tie

11 A 24 | U

B

B

A

U

U

DB

B

ie

U

U

D

A

A

A

SAMPLE

1 2 3 4 5 6 7 8 9 10 11

Number of defectives 22 17 19 25 18 20 21 17 23 23 24

Since the median isn’t given, it must be estimated from the sample data. To do this, array the data from low to high; the median is the middle value. (In this case, there is an odd number of values. For an even number of values, average the middle two to obtain the median.) Thus,

Solution

17 17 18 19 20 21 22 23 23 24 25

(5 below) ä  (5 above) median

The median is 21. Next, code the observations using A/B and U/D:

Note that each test has tied values. How these are resolved can affect the number of observed runs. Suppose that you adhere to this rule: Assign letter (A or B, U or D) so that the resulting difference between the observed and expected number of runs is as large as possible. To accomplish this, it is necessary to initially ignore ties and count the runs to see whether there are too many or too few. Then return to the ties and make the assignments. The rationale for this rule is that it is a conservative method for retaining data; if you conclude that the data are random using this approach, you can be reasonably confident that the method has not “created” randomness. With this in mind, assign a B to sample 7 since the expected number of runs is

( ) /2 1 11/2 1 6.5medE r N� � � � �

and the difference between the resulting number of runs, 5, and 6.5 is greater than between 6.5 and 7 (which occurs if A is used instead of B). Similarly, in the up/down test, a U for sample 10 produces six runs, whereas a D produces eight runs. Since the expected number of runs is

( ) (2 1) 3 (22 1) 3 7u/dE r N� � � � � � �

it makes no difference which one is used: both yield a difference of 1. For the sake of illustration, a D is assigned.

The computations for the two tests are summarized below. Each test has a z - value that is within the range of �  2.00. Because neither test reveals nonrandomness, you may conclude that the data are random.

Runs Observed Expected � r z Conclude

Median 5 6.5 1.58 � .95 Random

Up/down 8 7.0 1.28 .78 Random

ste24102_ch10_410-455.indd 446ste24102_ch10_410-455.indd 446 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

Chapter Ten Quality Control 447

1. List the steps in the control process.

2. What are the key concepts that underlie the construction and interpretation of control charts?

3. What is the purpose of a control chart?

4. Why is order of observation important in process control?

5. Briefly explain the purpose of each of these control charts: a. x - bar b. Range c. p - chart d. c - chart

6. What is a run? How are run charts useful in process control?

7. If all observations are within control limits, does that guarantee that the process is random? Explain.

8. Why is it usually desirable to use both a median run test and an up/down run test on the same data?

9. If both run tests are used, and neither reveals nonrandomness, does that prove that the process is random? Explain.

10. Define and contrast control limits, specifications, and process variability.

11. A customer has recently tightened the specs for a part your company supplies. The specs are now much tighter than the machine being used for the job is capable of. Briefly identify alternatives you might consider to resolve this problem. (See Figure 10.15C. )

12. A new order has come into your department. The capability of the process used for this type of work will enable virtually all of the output to be well within the specs. (See Figure 10.15B .)

a. What benefits might be derived from this situation? b. What alternatives might be considered by the manager?

DISCUSSION AND REVIEW QUESTIONS

Process capability. Determine which of these three processes are capable: Problem 6

Process Mean Standard Deviation

Lower Spec

Upper Spec

1 7.5 .10 7.0 8.0

2 4.6 .12 4.3 4.9

3 6.0 .14 5.5 6.7

Notice that the means of the first two processes are exactly in the center of their upper and lower specs. Hence, the C p index (Formula 10–10) is appropriate. However, the third process is not cen- tered, so C pk (Formula 10–11) is appropriate.

For Processes 1 and 2: Upper spec Lower spec

6 Cp �

In order to be capable, C p must be at least 1.33.

Process 1: 8.0 7.0

6(.10) 1.67 (capable)

Process 2: 4.9 4.3

6(.12) .83 (not capable)

C

C

p

p

� �

� �

For Process 3, C pk must be at least 1.33. It is the lesser of these two:

Upper spec Mean

3

6.7 6.0

3(.14) 1.67

Mean Lower spec

3

6.0 5.5

3(.14) 1.19 (not capable)

� �

� �

� �

� �

Solution

ste24102_ch10_410-455.indd 447ste24102_ch10_410-455.indd 447 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

448 Chapter Ten Quality Control

13. Answer these questions about inspection: a. What level of inspection is optimal? b. What factors guide the decision of how much to inspect? c. What are the main considerations in choosing between centralized inspection and on-site

inspection? d. What points are potential candidates for inspection?

14. What two basic assumptions must be satisfied in order to use a process capability index?

15. How important is it for managers to maintain and promote ethical behavior in dealing with quality issues? Does your answer depend on the product or service involved?

16. Classify each of the following as either a Type I error or a Type II error: a. Putting an innocent person in jail. b. Releasing a guilty person from jail. c. Eating (or not eating) a cookie that fell on the floor. d. Not seeing a doctor as soon as possible after ingesting poison.

1. What trade-offs are involved in each of these decisions? a. Deciding whether to use two-sigma or three-sigma control limits. b. Choosing between a large sample size and a smaller sample size. c. Trying to increase the capability of a process that is barely capable.

2. Who needs to be involved in setting quality standards?

3. Name several ways that technology has had an impact on quality control.

TAKING STOCK

1. Analysis of the output of a process has suggested that the variability is nonrandom on several occa- sions recently. However, each time an investigation has not revealed any assignable causes. What are some of the possible explanations for not finding any causes? What should the manager do?

2. Many organizations use the same process capability standard for all their products or services (e.g., 1.33), but some companies use multiple standards: different standards for different products or services (e.g., 1.00, 1.20, 1.33, and 1.40). What reasons might there be for using a single measure, and what reasons might there be for using multiple standards?

3. Give two examples of unethical behavior for each of these areas: inspection, process control, process capability. For each, name the relevant ethical principle (see Chapter 1).

4. In repetitive operations it is often possible to automatically check for quality and then reject parts that are unacceptable. In those situations, does that mean that control charts aren’t needed? Explain.

CRITICAL THINKING EXERCISES

1. Specifications for a part for a DVD player state that the part should weigh between 24 and 25 ounces. The process that produces the parts has a mean of 24.5 ounces and a standard deviation of .2 ounce. The distribution of output is normal. a. What percentage of parts will not meet the weight specs? b. Within what values will 95.44 percent of sample means of this process fall, if samples of n   �  16

are taken and the process is in control (random)?

2. An automatic filling machine is used to fill 1-liter bottles of cola. The machine’s output is approxi- mately normal with a mean of 1.0 liter and a standard deviation of .01 liter. Output is monitored using means of samples of 25 observations. a. Determine upper and lower control limits that will include roughly 97 percent of the sample

means when the process is in control. b. Given these sample means: 1.005, 1.001, .998, 1.002, .995, and .999, is the process in control?

3. The time to replace vehicle wiper blades at a service center was monitored using a mean and a range chart. Six samples of n   �  20 observations were obtained and the sample means and ranges computed:

PROBLEMS

Sample Mean Range Sample Mean Range

1 3.06 .42 4 3.13 .46

2 3.15 .50 5 3.06 .46

3 3.11 .41 6 3.09 .45

a. Using the factors in Table 10.3 , determine upper and lower limits for mean and range charts. b. Is the process in control?

ste24102_ch10_410-455.indd 448ste24102_ch10_410-455.indd 448 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

Chapter Ten Quality Control 449

DAY

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Number of complaints 4 10 14 8 9 6 5 12 13 7 6 4 2 10

OBSERVATION

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Number of defects 2 3 1 0 1 3 2 0 2 1 3 1 2 0

4. Computer upgrade times (in minutes) are being evaluated. Samples of five observations each have been taken, and the results are as listed. Using factors from Table 10.3 , determine upper and lower control limits for mean and range charts, and decide if the process is in control.

SAMPLE

1 2 3 4 5 6

79.2 80.5 79.6 78.9 80.5 79.7

78.8 78.7 79.6 79.4 79.6 80.6

80.0 81.0 80.4 79.7 80.4 80.5

78.4 80.4 80.3 79.4 80.8 80.0

81.0 80.1 80.8 80.6 78.8 81.1

5. Using samples of 200 credit card statements, an auditor found the following:

SAMPLE

1 2 3 4 5 6 7 8 9 10 11 12 13

Number of retests 1 2 2 0 2 1 2 0 2 7 3 2 1

7. The postmaster of a small western town receives a certain number of complaints each day about mail delivery. Determine three-sigma control limits using the following data. Is the process in control?

SAMPLE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Number of errors 5 3 5 7 4 6 8 4 5 9 3 4 5 6 6 7

8. Given the following data for the number of defects per spool of cable, using three-sigma limits, is the process in control?

9. After a number of complaints about its directory assistance, a telephone company examined sam- ples of calls to determine the frequency of wrong numbers given to callers. Each sample consisted of 100 calls. Determine 95 percent limits. Is the process stable (i.e., in control)? Explain.

Sample 1 2 3 4

Number with errors 4 2 5 9

a. Determine the fraction defective in each sample. b. If the true fraction defective for this process is unknown, what is your estimate of it? c. What is your estimate of the mean and standard deviation of the sampling distribution of

fractions defective for samples of this size? d. What control limits would give an alpha risk of .03 for this process? e. What alpha risk would control limits of .047 and .003 provide? f. Using control limits of .047 and .003, is the process in control? g. Suppose that the long-term fraction defective of the process is known to be 2 percent. What are

the values of the mean and standard deviation of the sampling distribution? h. Construct a control chart for the process, assuming a fraction defective of 2 percent, using

two-sigma control limits. Is the process in control?

6. A medical facility does MRIs for sports injuries. Occasionally a test yields inconclusive results and must be repeated. Using the following sample data and n   �  200, determine the upper and lower control limits for the fraction of retests using two-sigma limits. Is the process in control?

ste24102_ch10_410-455.indd 449ste24102_ch10_410-455.indd 449 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

450 Chapter Ten Quality Control

Sample Mean Sample Mean Sample Mean Sample Mean

1 3.86 11 3.88 21 3.84 31 3.88

2 3.90 12 3.86 22 3.82 32 3.76

3 3.83 13 3.88 23 3.89 33 3.83

4 3.81 14 3.81 24 3.86 34 3.77

5 3.84 15 3.83 25 3.88 35 3.86

6 3.83 16 3.86 26 3.90 36 3.80

7 3.87 17 3.82 27 3.81 37 3.84

8 3.88 18 3.86 28 3.86 38 3.79

9 3.84 19 3.84 29 3.98 39 3.85

10 3.80 20 3.87 30 3.96

10. Specifications for a metal shaft are much wider than the machine used to make the shafts is capable of. Consequently, the decision has been made to allow the cutting tool to wear a certain amount before replacement. The tool wears at the rate of .004 centimeter per piece. The process has a natural varia- tion, � , of .02 centimeter and is normally distributed. Specifications are 15.0 to 15.2 centimeters. A three-sigma cushion is set at each end to minimize the risk of output outside of the specifications. How many shafts can the process turn out before tool replacement becomes necessary? (See diagram.)

11. Specifications for the computer upgrades in Problem 4 are 78 minutes and 81 minutes. Based on the data given in the problem, are the specifications being met? Estimate the percentage of process output that can be expected to fall within the specifications.

15.0 15.2 Starting process mean

0

Ending process mean

Upper specification

Number of shafts

Lower specification

Wear rate = .004/p3s 3s

UCL

A.

LCL

UCL B.

LCL

12. The time needed for checking in at a hotel is to be investigated. Historically, the process has had a standard deviation equal to .146. The means of 39 samples of n   �  14 are

a. Construct an -chartx for this process with three-sigma limits. Is the process in control? b. Analyze the data using a median run test and an up/down run test. What can you conclude?

13. For each of the accompanying control charts, analyze the data using both median and up/down run tests with z   �   �  1.96 limits. Are nonrandom variations present? Assume the centerline is the long- term median.

ste24102_ch10_410-455.indd 450ste24102_ch10_410-455.indd 450 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

Chapter Ten Quality Control 451

Day Amount Day Amount Day Amount Day Amount

1 $27.69 16 $29.65 31 $40.54 46 25.16

2 28.13 17 31.08 32 36.31 47 26.11

3 33.02 18 33.03 33 27.14 48 29.84

4 30.31 19 29.10 34 30.38 49 31.75

5 31.59 20 25.19 35 31.96 50 29.14

6 33.64 21 28.60 36 32.03 51 37.78

7 34.73 22 20.02 37 34.40 52 34.16

8 35.09 23 26.67 38 25.67 53 38.28

9 33.39 24 36.40 39 35.80 54 29.49

10 32.51 25 32.07 40 32.23 55 30.81

11 27.98 26 44.10 41 26.76 56 30.60

12 31.25 27 41.44 42 30.51 57 34.46

13 33.98 28 29.62 43 29.35 58 35.10

14 25.56 29 30.12 44 24.09 59 31.76

15 24.46 30 26.39 45 22.45 60 34.90

14. Analyze the data in the problems listed below using median and up/down run tests with z   �   �  2. a. Given the following run test results of process output, what do the results of the run tests sug-

gest about the process?

Test z - score

Median +1.37

Up/Down +1.05

b. Twenty means were plotted on a control chart. An analyst counted 14 runs above/below the median, and 8 up/down runs. What do the results suggest about the process?

c. Problem 8. d. Problem 7.

15. Use both types of run tests to analyze the daily expense voucher listed. Assume a median of $31.

16. A company has just negotiated a contract to produce a part for another firm. In the process of man- ufacturing the part, the inside diameter of successive parts becomes smaller and smaller as the cut- ting tool wears. However, the specs are so wide relative to machine capabilities that it is possible to set the diameter initially at a large value and let the process run for a while before replacing the cutting tool.

The inside diameter decreases at an average rate of .001 cm per part, and the process has a standard deviation of .05 cm. The variability is approximately normal. Assuming a three-sigma buffer at each end, how frequently must the tool be replaced if the process specs are 3 cm and 3.5 cm?

3 3.5 process mean

0

process mean

Upper specification

Number of shafts

Lower specification

3s 3s

ste24102_ch10_410-455.indd 451ste24102_ch10_410-455.indd 451 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

452 Chapter Ten Quality Control

Process Standard Deviation (in.) Job Specification ( � in.)

001 .02 .05

002 .04 .07

003 .10 .18

004 .05 .15

005 .01 .04

SAMPLE

1 2 3 4

4.5 4.6 4.5 4.7

4.2 4.5 4.6 4.6

4.2 4.4 4.4 4.8

4.3 4.7 4.4 4.5

4.3 4.3 4.6 4.9

a. Determine the mean of each sample. b. If the process parameters are unknown, estimate its mean and standard deviation. c. Estimate the mean and standard deviation of the sampling distribution. d. What would three-sigma control limits for the process be? What alpha risk would they

provide? e. What alpha risk would control limits of 4.14 and 4.86 provide? f. Using limits of 4.14 and 4.86, are any sample means beyond the control limits? If so, which

one(s)? g. Construct control charts for means and ranges using Table 10.3 . Are any samples beyond the

control limits? If so, which one(s)? h. Explain why the control limits are different for means in parts d and g. i. If the process has a known mean of 4.4 and a known standard deviation of .18, what would

three-sigma control limits be for a mean chart? Are any sample means beyond the control limits? If so, which one(s)?

21. A process that produces computer chips has a mean of .04 defective chip and a standard deviation of .003 chip. The allowable variation is from .03 to .05 defective.

a. Compute the capability index for the process. b. Is the process capable?

22. Given the following list of processes, the standard deviation for each, and specifications for a job that may be processed on that machine, determine which machines are capable of performing the given jobs.

17. (Refer to Solved Problem 2.) Suppose the process specs are 9.65 and 10.35 minutes. Based on the data given, does it appear that the specs are being met? If not, what should one look for?

18. A production process consists of a three-step operation. The scrap rate is 10 percent for the first step and 6 percent for the other two steps.

a. If the desired daily output is 450 units, how many units must be started to allow for loss due to scrap?

b. If the scrap rate for each step could be cut in half, how many units would this save in terms of the scrap allowance?

c. If the scrap represents a cost of $10 per unit, how much is it costing the company per day for the original scrap rate?

19. (Refer to the data in Example 5.) Two additional observations have been taken. The first resulted in three defects, and the second had four defects. Using the set of 20 observations, perform run tests on the data. What can you conclude about the data?

20. A teller at a drive-up window at a bank had the following service times (in minutes) for 20 randomly selected customers:

ste24102_ch10_410-455.indd 452ste24102_ch10_410-455.indd 452 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

Chapter Ten Quality Control 453

UCL

LCL

Observation 1 2 3 4 5 6 7 8 9 10 11 12

No. of errors 1 0 3 2 0 1 3 2 1 0 2 3

Machine Cost per Unit ($) Standard Deviation (mm)

A 20 .059

B 12 .060

C 11 .063

D 10 .061

Process Mean Standard Deviation Lower Spec Upper Spec

H 15.0 0.32 14.1 16.0

K 33.0 1.00 30.0 36.5

T 18.5 0.40 16.5 20.1

23. Suppose your manager presents you with the following information about machines that could be used for a job, and wants your recommendation on which one to choose. The specification width is .48 mm. In this instance, you can narrow the set of choices, but you probably wouldn’t make a rec- ommendation without an additional piece of information. Explain the logic of the last statement.

25. An appliance manufacturer wants to contract with a repair shop to handle authorized repairs in Indianapolis. The company has set an acceptable range of repair time of 50 minutes to 90 minutes. Two firms have submitted bids for the work. In test trials, one firm had a mean repair time of 74 minutes with a standard deviation of 4.0 minutes and the other firm had a mean repair time of 72 minutes with a standard deviation of 5.1 minutes. Which firm would you choose? Why?

26. As part of an insurance company’s training program, participants learn how to conduct an analy- sis of clients’ insurability. The goal is to have participants achieve a time in the range of 30 to 45 minutes. Test results for three participants were: Armand, a mean of 38 minutes and a standard deviation of 3 minutes; Jerry, a mean of 37 minutes and a standard deviation of 2.5 minutes; and Melissa, a mean of 37.5 minutes and a standard deviation of 1.8 minutes.

a. Which of the participants would you judge to be capable? Explain. b. Can the value of the C pk exceed the value of C p for a given participant? Explain.

27. The Good Chocolate Company makes a variety of chocolate candies, including a 12-ounce choco- late bar (340 grams) and a box of six 1-ounce chocolate bars (170 grams).

a. Specifications for the 12-ounce bar are 330 grams to 350 grams. What is the largest standard deviation (in grams) that the machine that fills the bar molds can have and still be considered capable if the average fill is 340 grams?

b. The machine that fills the bar molds for the 6-ounce bars has a standard deviation of .80 gram. The filling machine is set to deliver an average of 1.01 ounces per bar. Specifications for the six-bar box are 160 to 180 grams. Is the process capable? Hint: The variance for the box is equal to six times the bar variance.

c. What is the lowest setting in ounces for the filling machine that will provide capability in terms of the six-bar box?

28. The following is a control chart for the average number of minor errors in 22 service reports. What can you conclude from these data? Explain how you reached your conclusion.

29. Use the three-step process described on p. 435 to decide if the following observations represent a process that is in control.

24. Each of the processes listed is noncentered with respect to the specifications for that process. Compute the appropriate capability index for each, and decide if the process is capable.

ste24102_ch10_410-455.indd 453ste24102_ch10_410-455.indd 453 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

454 Chapter Ten Quality Control

Tiger Tools, a division of Drillmore Industries, was about to launch a new product. Production Manager Michelle York asked her assistant, Jim Peterson, to check the capability of the oven used in the process. Jim obtained 18 random samples of 20 pieces each. The results of those samples are shown in the following table. After he analyzed the data, he concluded that the process was not capable based on a specification width of 1.44 cm.

Michelle was quite disappointed when she heard this. She had hoped that with the introduction of the new product her operation could run close to full capacity and regain some of its lost luster. The com- pany had a freeze on capital expenditures of more than $10,000, and a replacement oven would cost many times that amount. Jim Peterson worked with the oven crew to see if perhaps different settings could produce the desired results, but they were unable to achieve any mean- ingful improvements.

that he would take 27 samples of five observations each. The results are shown in the following table.

CASE Tiger Tools

Sample Mean Range

1 45.01 .85

2 44.99 .89

3 45.02 .86

4 45.00 .91

5 45.04 .87

6 44.98 .90

7 44.91 .86

8 45.04 .89

9 45.00 .85

Still not ready to concede, Michelle contacted one of her former pro- fessors and explained the problem. The professor suggested obtaining another set of samples, this time using a smaller sample size and tak- ing more samples. Michelle then conferred with Jim and they agreed

Sample Mean Range

1 44.96 .42

2 44.98 .39

3 44.96 .41

4 44.97 .37

5 45.02 .39

6 45.03 .40

7 45.04 .39

8 45.02 .42

9 45.08 .38

10 45.12 .40

11 45.07 .41

12 45.02 .38

13 45.01 .41

14 44.98 .40

Questions Consider the following questions, and then write a brief report to Michelle summarizing your findings.

1. How did Jim conclude that the process was not capable based on his first set of samples? ( Hint: Estimate the process standard devia- tion, � , using

� A R

n 3 .2 � )

2. Does the second set of samples show anything that the first set didn’t? Explain what and why.

3. Assuming the problem can be found and corrected, what impact do you think this would have on the capability of the process? Compute the potential process capability using the second data set.

4. If small samples can reveal something that large samples might not, why not just take small samples in every situation?

Sample Mean Range

15 45.00 .39

16 44.95 .41

17 44.94 .43

18 44.94 .40

19 44.87 .38

20 44.95 .41

21 44.93 .39

22 44.96 .41

23 44.99 .40

24 45.00 .44

25 45.03 .42

26 45.04 .38

27 45.03 .40 Sample Mean Range

10 44.97 .91

11 45.11 .84

12 44.96 .87

13 45.00 .86

14 44.92 .89

15 45.06 .87

16 44.94 .86

17 45.00 .85

18 45.03 .88

Toys, Inc., is a 20-year-old company engaged in the manufacture and sale of toys and board games. The company has built a reputation on quality and innovation. Although the company is one of the leaders in its field, sales have leveled off in recent years. For the most recent six- month period, sales actually declined compared with the same period last year. The production manager, Ed Murphy, attributed the lack of sales growth to “the economy.” He was prompted to undertake a num- ber of belt-tightening moves that included cuts in production costs and layoffs in the design and product development departments. Although profits are still flat, he believes that within the next six months, the results of his decisions will be reflected in increased profits.

The vice president of sales, Joe Martin, has been concerned with cus- tomer complaints about the company’s Realistic line of working-model factories, farms, and service stations. The moving parts on certain models have become disengaged and fail to operate or operate erratically. His

assistant, Keith McNally, has proposed a trade-in program by which customers could replace mal- functioning models with new ones. McNally believes that this will dem- onstrate goodwill and appease dissatisfied customers. He also proposes rebuilding the trade-ins and selling them at discounted prices in the com- pany’s retail outlet store. He doesn’t think that this will take away from sales of new models. Under McNally’s program, no new staff would be needed. Regular workers would perform needed repairs during periods of seasonal slowdowns, thus keeping production level.

When Steve Bukowski, a production assistant, heard Keith’s pro- posal, he said that a better option would be to increase inspection of fin- ished models before they were shipped. “With 100 percent inspection, we can weed out any defective models and avoid the problem entirely.”

Take the role of a consultant who has been called in for advice by the company president, Marybeth Corbella. What do you recommend?

CASE Toys, Inc.

ste24102_ch10_410-455.indd 454ste24102_ch10_410-455.indd 454 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

Chapter Ten Quality Control 455

Besterfield, Dale H. Quality Control. Upper Saddle River, NJ: Prentice Hall, 2009.

Mitra, Amitava. Fundamentals of Quality Control and Improvement. 3rd ed. Hoboken, NJ: John Wiley & Sons, 2008.

Montgomery, Douglas C. Introduction to Statistical Quality Control. 6th ed. New York: John Wiley and Sons, 2009.

Quality Management Journal. ASQ. asq.org

Quality Progress. www.qualityprogress.com

Summers, Donna. Quality. 5th ed. Upper Saddle River, NJ: Prentice Hall, 2009.

SELECTED BIBLIOGRAPHY AND FURTHER

READINGS

ste24102_ch10_410-455.indd 455ste24102_ch10_410-455.indd 455 11/1/13 2:53 PM11/1/13 2:53 PM

Final PDF to printer

456

C H A P T E R

11 Aggregate Planning and Master Scheduling

After completing this chapter, you should be able to:

LO11.1 Explain what aggregate planning is and how it is useful.

LO11.2 Identify the variables decision makers have to work with in aggregate planning.

LO11.3 Describe some of the strategies that can be used for meeting uneven demand.

LO11.4 Describe some of the graphical and quantitative techniques planners use.

LO11.5 Prepare aggregate plans and compute their costs.

LO11.6 Discuss aggregate planning in services.

LO11.7 Disaggregate an aggregate plan.

LO11.8 Describe the master scheduling process and explain its importance.

LEARNING OBJECTIVES

CHAPTER OUTLINE

11.1 Introduction, 458 Intermediate Planning in Perspective, 458

The Concept of Aggregation, 459

Dealing with Variations, 460

An Overview of Aggregate Planning, 460

Aggregate Planning and the Supply Chain, 461

Demand and Supply Options, 461

11.2 Basic Strategies for Meeting Uneven Demand, 465 Choosing a Strategy, 467

11.3 Techniques for Aggregate Planning, 468 Trial-and-Error Techniques Using Graphs and Spreadsheets, 468

Mathematical Techniques, 472

11.4 Aggregate Planning in Services, 475

11.5 Disaggregating the Aggregate Plan, 477

11.6 Master Scheduling, 477 The Master Scheduler, 478

11.7 The Master Scheduling Process, 478 Time Fences, 479

Inputs, 480

Outputs, 480

Case: Eight Glasses a Day (EGAD), 492

ste24102_ch11_456-493.indd 456ste24102_ch11_456-493.indd 456 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

457

Aggregate planning is intermediate-range capacity planning that typically covers a time hori- zon of 2 to 12 months, although in some companies it may extend to as much as 18 months. It is particularly useful for organizations that experience seasonal or other fluctuations in demand or capacity. The goal of aggregate planning is to achieve a production plan that will effectively utilize the organization’s resources to match expected demand. Planners must make decisions on output rates, employment levels and changes, inventory levels and changes, back orders, and subcontracting in or out. They do this for products that are grouped (i.e., aggregated) into categories rather than for individual products. For instance, a company that makes lawn mow- ers might have multiple models of push mowers, self-propelled mowers, and riding mowers. The company would aggregate along those three lines. For example,

Aggregate planning   Intermediate-range capacity planning, usually covering 2 to 12 months.

Category Models

Push 2

Self-propelled 6

Riding 3

LO11.1 Explain what aggregate planning is and how it is useful.

Seasonal variations in demand are quite common in many industries and public services, such as air-conditioning, fuel, public utilities, police and fire protection, and travel. And these are just a few examples of industries and public services that have to deal with uneven demands. Generally speaking, organizations cannot predict exactly the quantity and timing of demands for specific products or services months in advance under these conditions. Even so, they typically must assess their capacity needs (e.g., labor, inventories) and costs months in advance in order to be able to handle demand.

Some organizations use the term “sales and operations planning” instead of aggregate plan- ning for intermediate-range planning. Similarly, sales and operations planning is defined as making intermediate-range decisions to balance supply and demand, integrating financial and operations planning. Because the plan affects functions throughout the organization, it is

Sales and operations planning  Intermediate-range decisions to balance supply and demand, integrating financial and operations planning.

ste24102_ch11_456-493.indd 457ste24102_ch11_456-493.indd 457 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

458 Chapter Eleven Aggregate Planning and Master Scheduling

typically prepared with inputs from sales (demand forecasts), finance (financial constraints), and operations (capacity constraints). Note that the sales and operations plan is important planning information that will have impacts throughout the supply chain, and it should be shared with supply chain partners, who might also have valuable inputs.

11.1 INTRODUCTION

Intermediate Planning in Perspective Organizations make capacity decisions on three levels: long term, intermediate term, and short term. Long-term decisions relate to product and service selection (i.e., determining which products or services to offer), facility size and location, equipment decisions, and layout of facilities. These long-term decisions essentially establish the capacity constraints within which intermediate planning must function. Intermediate decisions, as noted above, relate to general levels of employment, output, and inventories, which in turn establish boundaries within which short-range capacity decisions must be made. Thus, short-term decisions essentially consist of deciding the best way to achieve desired results within the constraints resulting from long- term and intermediate-term decisions. Short-term decisions involve scheduling jobs, workers and equipment, and the like. The three levels of capacity decisions are depicted in Table 11.1 . Long-term capacity decisions were covered in Chapter 5, and scheduling and related matters are covered in Chapter 16. This chapter covers intermediate capacity decisions.

Short-Range Plans

Detailed plans: Production lot size Order quantities Machine loading Job assignments Job sequencing Work schedules

Intermediate Plans

(This chapter) General levels of: Employment Output Finished-goods inventories Subcontracting Back orders

13

16

16

Long-Range Plans

Long-term capacity Location Layout Product design Work system design

5 8

6 4

7

TABLE 11.1 Overview of planning levels (chapter numbers are shown)

Even though Toyota and Lexus cars have a variety of makes and models, they often share the same chassis and the same parts. How does this add to the company’s efficiencies as a top automaker?

ste24102_ch11_456-493.indd 458ste24102_ch11_456-493.indd 458 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

Chapter Eleven Aggregate Planning and Master Scheduling 459

FIGURE 11.1 Planning sequence Corporate

strategies and policies

Economic, competitive, and political conditions

Aggregate demand forecasts

Business plan

Aggregate plan

Master schedule

Establishes operations and capacity strategies

Establishes operations capacity

Establishes schedules for specific products

Many business organizations develop a business plan that encompasses both long-term and intermediate-term planning. The business plan establishes guidelines for the organization, tak- ing into account the organization’s strategies and policies; forecasts of demand for the organiza- tion’s products or services; and economic, competitive, and political conditions. A key objective in business planning is to coordinate the intermediate plans of various organization functions, such as marketing, operations, and finance. In manufacturing companies, coordination also includes engineering and materials management. Consequently, all of these functional areas must work together to formulate the aggregate plan. Aggregate planning decisions are strate- gic decisions that define the framework within which operating decisions will be made. They are the starting point for scheduling and production control systems. They provide input for financial plans; they involve forecasting input and demand management, and they may require changes in employment levels. And if the organization is involved in time-based competition, it will be important to incorporate some flexibility in the aggregate plan to be able to handle changing requirements promptly. As noted, the plans must fit into the framework established by the organization’s long-term goals and strategies, and the limitations established by long-term facility and capital budget decisions. The aggregate plan will guide the more detailed planning that eventually leads to a master schedule. Figure 11.1 illustrates the planning sequence.

Aggregate planning also can serve as an important input to other strategic decisions; for example, management may decide to add capacity when aggregate planning alternatives for temporarily increasing capacity, such as working overtime and subcontracting, are too costly.

The Concept of Aggregation Aggregate planning is essentially a “big-picture” approach to planning. Planners usually try to avoid focusing on individual products or services—unless the organization has only one major product or service. Instead, they focus on a group of similar products or services, or sometimes an entire product or service line. For example, planners in a company producing television sets would not concern themselves with 40-inch sets versus 46-inch or 55-inch sets. Instead, planners would lump all models together and deal with them as though they were a single product, hence the term aggregate planning. Thus, when fast-food companies such as McDonald’s, Burger King, or Wendy’s plan employment and output levels, they don’t try to determine how demand will be broken down into the various menu options they offer; they focus on overall demand and the overall capacity they want to provide.

Now consider how aggregate planning might work in a large department store. Space allo- cation is often an aggregate decision. That is, a manager might decide to allocate 20 percent of

ste24102_ch11_456-493.indd 459ste24102_ch11_456-493.indd 459 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

460 Chapter Eleven Aggregate Planning and Master Scheduling

the available space in the clothing department to women’s sportswear, 30 percent to juniors, and so on, without regard for what brand names will be offered or how much of juniors will be jeans. The aggregate measure might be square feet of space or racks of clothing.

For purposes of aggregate planning, it is often convenient to think of capacity in terms of labor hours or machine hours per period, or output rates (barrels per period, units per period), without worrying about how much of a particular item will actually be involved. This approach frees planners to make general decisions about the use of resources without having to get into the complexities of individual product or service requirements. Product group- ings make the problem of obtaining an acceptable unit of aggregation easier because product groupings may lend themselves to the same aggregate measures.

Why do organizations need to do aggregate planning? The answer is twofold. One part is related to planning: It takes time to implement plans. For instance, if plans call for hiring (and training) new workers, that will take time. The second part is strategic: Aggregation is impor- tant because it is not possible to predict with any degree of accuracy the timing and volume of demand for individual items. So if an organization were to “lock in” on individual items, it would lose the flexibility to respond to the market.

Generally speaking, aggregate planning is connected to the budgeting process. Most orga- nizations plan their financial requirements annually on a department-by-department basis.

Finally, aggregate planning is important because it can help synchronize flow throughout the supply chain; it affects costs, equipment utilization, employment levels, and customer satisfaction.

A key issue in aggregate planning is how to handle variations.

Dealing with Variations As in other areas of business management, variations in either supply or demand can occur. Minor variations are usually not a problem, but large variations generally have a major impact on the ability to match supply and demand, so they must be dealt with. Most organizations use rolling 3-, 6-, 9-, and 12-month forecasts—forecasts that are updated periodically—rather than relying on a once-a-year forecast. This allows planners to take into account any changes in either expected demand or expected supply and to develop revised plans.

Some businesses tend to exhibit a fair degree of stability, whereas in others, variations are more the norm. In those instances, a number of strategies are used to counter variations. One is to maintain a certain amount of excess capacity to handle increases in demand. This strategy makes sense when the opportunity cost of lost revenue greatly exceeds the cost of maintaining excess capacity. Another strategy is to maintain a degree of flexibility in dealing with changes. That might involve hiring temporary workers and/or working overtime when needed. Organizations that experience seasonal demands typically use this approach. Some of the design strategies mentioned in Chapter 4, such as delayed differentiation and modular design, may also be options. Still another strategy is to wait as long as possible before commit- ting to a certain level of supply capability. This might involve scheduling products or services with known demands first, which allows some time to pass, shortening the time horizon, and perhaps enabling demands for the remaining products or services to become less uncertain.

An Overview of Aggregate Planning Aggregate planning begins with a forecast of aggregate demand for the intermediate range. This is followed by a general plan to meet demand requirements by setting output, employ- ment, and finished-goods inventory levels or service capacities. Managers might consider a number of plans, each of which must be examined in light of feasibility and cost. If a plan is reasonably good but has minor difficulties, it may be reworked. Conversely, a poor plan should be discarded and alternative plans considered until an acceptable one is uncovered. An aggregate production plan is essentially the output of aggregate planning.

Aggregate plans are updated periodically, often monthly, to take into account updated fore- casts and other changes. This results in a rolling planning horizon (i.e., the aggregate plan always covers the next 12 to 18 months).

ste24102_ch11_456-493.indd 460ste24102_ch11_456-493.indd 460 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

Chapter Eleven Aggregate Planning and Master Scheduling 461

Demand and Supply. Aggregate planners are concerned with the quantity and the tim- ing of expected demand. If total expected demand for the planning period is much different from available capacity over that same period, the major approach of planners will be to try to achieve a balance by altering capacity, demand, or both. On the other hand, even if capac- ity and demand are approximately equal for the planning horizon as a whole, planners may still be faced with the problem of dealing with uneven demand within the planning interval. In some periods, expected demand may exceed projected capacity, in others expected demand may be less than projected capacity, and in some periods the two may be equal. The task of aggregate planners is to achieve rough equality of demand and capacity over the entire planning horizon. Moreover, planners are usually concerned with minimizing the cost of the aggregate plan, although cost is not the only consideration.

Inputs to Aggregate Planning. Effective aggregate planning requires good information. First, the available resources over the planning period must be known. Then, a forecast of expected demand must be available. Finally, planners must take into account any policies regarding changes in employment levels (e.g., some organizations view layoffs as extremely undesirable, so they would use that only as a last resort).

Table 11.2 lists the major inputs to aggregate planning. Companies in the travel industry and some other industries often experience duplicate

orders from customers who make multiple reservations but only intend to keep at most one of them. This makes capacity planning all the more difficult.

Aggregate Planning and the Supply Chain It is essential to take supply chain capabilities into account when doing aggregate planning, to assure that there are no quantity or timing issues that need to be resolved. While this is particularly true if new or changed goods or services are involved, it is also true even when no changes are planned. Supply chain partners should be consulted during the planning stage so that any issues or advice they may have can be taken into account, and they should be informed when plans have been finalized.

Demand and Supply Options Aggregate planning strategies can pertain to demand, capacity, or both. Demand strategies are intended to alter demand so that it matches capacity. Capacity strategies involve altering capacity so that it matches demand. Mixed strategies involve both of these approaches.

TABLE 11.2 Aggregate planning inputs and outputs

Inputs Outputs

Resources Total cost of a plan Workforce/production rates Projected levels of Facilities and equipment Inventory Demand forecast Output Policies on workforce changes Employment Subcontracting Subcontracting Overtime Backordering Inventory levels/changes Back orders Costs Inventory carrying cost Back orders Hiring/firing Overtime Inventory changes Subcontracting

ste24102_ch11_456-493.indd 461ste24102_ch11_456-493.indd 461 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

462 Chapter Eleven Aggregate Planning and Master Scheduling

Demand Options. Demand options include pricing, promotions, using back orders (delay- ing order filling), and creating new demand.

1. Pricing. Pricing differentials are commonly used to shift demand from peak periods to off-peak periods. Some hotels, for example, offer lower rates for weekend stays, and some airlines offer lower fares for night travel. Movie theaters may offer reduced rates for matinees, and some restaurants offer “early bird specials” in an attempt to shift some of the heavier dinner demand to an earlier time that traditionally has less traffic. Some restaurants also offer smaller portions at reduced rates, and most have smaller portions and prices for children. To the extent that pricing is effective, demand will be shifted so that it corresponds more closely to capacity, albeit for an opportunity cost that represents the lost profit stemming from capacity insufficient to meet demand during certain periods.

An important factor to consider is the degree of price elasticity for the product or ser- vice: The more the elasticity, the more effective pricing will be in influencing demand patterns.

2. Promotion. Advertising and other forms of promotion, such as displays and direct mar- keting, can sometimes be very effective in shifting demand so that it conforms more closely to capacity. Obviously, timing of these efforts and knowledge of response rates and response patterns will be needed to achieve the desired results. Unlike pricing pol-

icy, there is much less control over the timing of demand, so there is the risk that promotion can worsen the condition it was intended to improve, by bringing in demand at the wrong time, further stressing capacity.

3. Back orders. An organization can shift demand fulfillment to other periods by allowing back orders. That is, orders are taken in one period and deliveries promised for a later period. The success of this approach depends on how will- ing customers are to wait for delivery. More- over, the costs associated with back orders can be difficult to pin down since they would include lost sales, annoyed or disappointed cus- tomers, and perhaps additional paperwork.

Yet it is important to account for double orders. Otherwise, by counting duplicate orders as true demand, you overestimate the demand rate, and by counting the cancellations of duplicate orders as lost sales, you overestimate customers’ sensitivity to delay, and then you wind up with excess capacity.

“The optimal level of capacity increases with customers’ sensitivity to delay, so estimating customers’ sensitivity to delay is a very impor- tant part of the puzzle.”

Duplicate orders can make capacity planning very difficult. The key is to carefully estimate both the rate of duplicate ordering and the degree of order cancellation that can be attributed to duplicate ordering.

Source: Based on Mor Armony and Erica L. Plambeck, “The Impact of Duplicate Orders on Demand Estimation and Capacity Investment,” GSB Research Paper #1740, Graduate School of Business, Stanford University, June 2002.

We’ve all heard about someone who booked seats on two airlines, or reserved two hotel rooms, usually because travel plans weren’t firmed up, but the person didn’t want to miss out on the trip. Later, the person canceled one set of reservations. This sort of duplicate ordering isn’t just limited to the travel industry. The trouble is, companies base their capac- ity planning on demand estimates, and when there are numerous dupli- cate orders, it is easy to overestimate demand and end up with excess capacity. In some instances, this has led companies to expand at a time when demand was actually leveling off or even decreasing! The problem is further compounded if companies conclude that canceled orders reflect customers’ reluctance to wait, and respond by adding capacity when, in fact, order cancellation may actually reflect duplicate ordering.

Some semiconductor companies downplay data on bookings because it is too difficult to distinguish between duplicate orders and actual demand.

READING Duplicate Orders Can Lead to Excess Capacity

LO11.2 Identify the variables decision makers have to work with in aggregate planning.

ZIGGY (c)2000 ZIGGY AND FRIENDS, INC. Reprinted with permission of UNIVERSAL UCLICK. All rights reserved.

ste24102_ch11_456-493.indd 462ste24102_ch11_456-493.indd 462 11/29/13 12:03 AM11/29/13 12:03 AM

Final PDF to printer

Chapter Eleven Aggregate Planning and Master Scheduling 463

4. New demand. Many organizations are faced with the problem of having to provide products or services for peak demand in situations where demand is very uneven. For instance, demand for bus transportation tends to be more intense during the morning and late afternoon rush hours but much lighter at other times. Creating new demand for buses at other times (e.g., trips by schools, clubs, and senior citizen groups) would make use of the excess capacity during those slack times. Similarly, many fast-food restaurants are open for breakfast to use their capacities more fully, and some land- scaping firms in northern climates use their equipment during the winter months for snow removal. Manufacturing firms that experience seasonal demands for certain products (e.g., snowblowers) are sometimes able to develop a demand for a comple- mentary product (e.g., lawn mowers, garden equipment) that makes use of the same production processes. They thereby achieve a more consistent use of labor, equipment, and facilities. Another option may be “insourcing” work from another organization.

Supply Options. Supply options include hiring/laying off workers, overtime/slack time, part-time or temporary workers, inventories, and subcontractors.

1. Hire and lay off workers. The extent to which operations are labor intensive deter- mines the impact that changes in the workforce level will have on capacity. The resource requirements of each worker also can be a factor. For instance, if a supermarket usually has 10 of 14 checkout lines operating, an additional four checkout workers could be added. Hence, the ability to add workers is constrained at some point by other resources needed to support the workers. Conversely, there may be a lower limit on the number of workers needed to maintain a viable operation (e.g., a skeleton crew).

Union contracts may restrict the amount of hiring and laying off a company can do. Moreover, because laying off can present serious problems for workers, some firms have policies that either prohibit or limit downward adjustments to a workforce. On the other hand, hiring presumes an available supply of workers. This may change from time to time and, at times of low supply, have an impact on the ability of an organization to pursue this approach.

Another consideration is the skill level of workers. Highly skilled workers are gen- erally more difficult to find than lower-skilled workers, and recruiting them involves greater costs. So the usefulness of this option may be limited by the need for highly skilled workers.

The use of hiring and laying off entails certain costs. Hiring costs include recruit- ment, screening, and training to bring new workers “up to speed.” And quality may suffer. Some savings may occur if workers who have recently been laid off are rehired. Layoff costs include severance pay, the cost of realigning the remaining workforce, potential bad feelings toward the firm on the part of workers who have been laid off, and some loss of morale for workers who are retained (i.e., in spite of company assurances, some workers will believe that in time they too will be laid off).

An increasing number of organizations view workers as assets rather than as variable costs, and would not consider this approach. Instead, they might use slack time for other purposes.

2. Overtime/slack time. Use of overtime or slack time is a less severe method for chang- ing capacity than hiring and laying off workers, and it can be used across the board or selectively as needed. It also can be implemented more quickly than hiring and laying off and allows the firm to maintain a steady base of employees. The use of overtime can be especially attractive in dealing with seasonal demand peaks by reducing the need to hire and train people who will have to be laid off during the off-season. Overtime also permits the company to maintain a skilled workforce and employees to increase earn- ings, and companies may save money because fringe and other benefits are generally fixed. Moreover, in situations with crews, it is often necessary to use a full crew rather than to hire one or two additional people. Thus, having the entire crew work overtime would be preferable to hiring extra people.

ste24102_ch11_456-493.indd 463ste24102_ch11_456-493.indd 463 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

464 Chapter Eleven Aggregate Planning and Master Scheduling

It should be noted that some union contracts allow workers to refuse overtime. In those cases, it may be difficult to muster a full crew to work overtime or to get an entire production line into operation after regular hours. Although workers often like the addi- tional income overtime can generate, they may not appreciate having to work on short notice or the fluctuations in income that result. Still other considerations relate to the fact that overtime often results in lower productivity, poorer quality, more accidents, and increased payroll costs, whereas idle time results in less efficient use of machines and other fixed assets.

The use of slack when demand is less than capacity can be an important consider- ation. Some organizations use this time for training. It also can give workers time for problem solving and process improvement, while retraining skilled workers.

3. Part-time workers. In certain instances, the use of part-time workers is a viable option—much depends on the nature of the work, training and skills needed, and union agreements. Seasonal work requiring low-to-moderate job skills lends itself to part-time workers, who generally cost less than regular workers in hourly wages and fringe ben- efits. However, unions may regard such workers unfavorably because they typically do not pay union dues and may lessen the power of unions. Department stores, restaurants, and supermarkets make use of part-time workers. So do parks and recreation depart- ments, resorts, travel agencies, hotels, and other service organizations with seasonal demands. In order to be successful, these organizations must be able to hire part-time employees when they are needed.

Some companies use contract workers, also called independent contractors, to fill certain needs. Although they are not regular employees, often they work alongside reg- ular workers. In addition to having different pay scales and no benefits, they can be added or subtracted from the workforce with greater ease than regular workers, giving companies great flexibility in adjusting the size of the workforce.

4. Inventories. The use of finished-goods inventories allows firms to produce goods in one period and sell or ship them in another period, although this involves holding or carrying those goods as inventory until they are needed. The cost includes not only storage costs and the cost of money tied up that could be invested elsewhere, but also the cost of insurance, obsolescence, deterioration, spoilage, breakage, and so on. In essence, inventories can be built up during periods when production capacity exceeds demand and drawn down in periods when demand exceeds production capacity.

Amazon is very aggressive about managing its inventory levels. This may mean that rarely ordered items are not kept in inventory and may require time to source from a supplier. It also means that Amazon tries to move inventory out to customers as quickly as possible.

ste24102_ch11_456-493.indd 464ste24102_ch11_456-493.indd 464 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

Chapter Eleven Aggregate Planning and Master Scheduling 465

This method is more amenable to manufacturing than to service industries since man- ufactured goods can be stored whereas services generally cannot. However, an analo- gous approach used by services is to make efforts to streamline services (e.g., standard forms) or otherwise do a portion of the service during slack periods (e.g., organize the workplace). In spite of these possibilities, services tend not to make much use of inven- tories to alter capacity requirements.

5. Subcontracting. Subcontracting enables planners to acquire temporary capacity, although it affords less control over the output and may lead to higher costs and quality problems. The question of whether to make or buy (i.e., in manufacturing) or to perform a service or hire someone else to do the work generally depends on factors such as available capacity, relative expertise, quality considerations, cost, and the amount and stability of demand.

Conversely, in periods of excess capacity, an organization may subcontract in, that is, conduct work for another organization. As an alternative to subcontracting, an organiza- tion might consider outsourcing: contracting with another organization to supply some portion of the goods or services on a regular basis.

11.2 BASIC STRATEGIES FOR MEETING UNEVEN DEMAND As you see, managers have a wide range of decision options they can consider for achieving a balance of demand and capacity in aggregate planning. Since the options that are most suited to influencing demand fall more in the realm of marketing than in operations (with the excep- tion of backlogging), we shall concentrate on the capacity options, which are in the realm of operations but include the use of back orders.

Aggregate planners might adopt a number of strategies. Some of the more prominent ones are the following:

1. Maintain a level workforce (level capacity).

2. Maintain a steady output rate (level capacity).

3. Match demand period by period (chase demand).

4. Use a combination of decision variables.

While other strategies might be considered, these will suffice to give you a sense of how aggregate planning operates in a vast number of organizations. The first three strategies are “pure” strategies because each has a single focal point; the last strategy is “mixed” because it lacks the single focus. Under a level capacity strategy , variations in demand are met by using some combination of inventories, overtime, part-time workers, subcontracting, and back orders while maintaining a steady rate of output. Matching capacity to demand implies a chase demand strategy; the planned output for any period would be equal to expected demand for that period.

Many organizations regard a level workforce as very appealing. Since workforce changes through hiring and laying off can have a major impact on the lives and morale of employees and can be disruptive for managers, organizations often prefer to handle uneven demand in other ways. Moreover, changes in workforce size can be very costly, and there is always the risk that there will not be a sufficient pool of workers with the appropriate skills when needed. Aside from these considerations, such changes can involve a significant amount of paper- work. Unions tend to favor a level workforce because the freedom to hire and lay off workers diminishes union strengths.

To maintain a constant level of output and still satisfy varying demand, an organization must resort to some combination of subcontracting, backlogging, and use of inventories to absorb fluctuations. Subcontracting requires an investment in evaluating sources of supply as well as possible increased costs, less control over output, and perhaps quality consider- ations. Backlogs can lead to lost sales, increased record keeping, and lower levels of customer

SCREENCAM TUTORIAL

Level capacity strategy   Maintaining a steady rate of regular-time output while meet- ing variations in demand by a combination of options.

Chase demand strategy   Matching capacity to demand; the planned output for a period is set at the expected demand for that period.

LO11.3 Describe some of the strategies that can be used for meeting uneven demand.

ste24102_ch11_456-493.indd 465ste24102_ch11_456-493.indd 465 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

466 Chapter Eleven Aggregate Planning and Master Scheduling

service. Allowing inventories to absorb fluctuations can entail substantial costs by having money tied up in inventories, having to maintain relatively large storage facilities, and incur- ring other costs related to inventories. Furthermore, inventories are not usually an alternative for service-oriented organizations. However, there are certain advantages, such as minimum costs of recruitment and training, minimum overtime and idle-time costs, fewer morale prob- lems, and stable use of equipment and facilities.

A chase demand strategy presupposes a great deal of ability and willingness on the part of managers to be flexible in adjusting to demand. A major advantage of this approach is that inventories can be kept relatively low, which can yield substantial savings for an organization. A major disadvantage is the lack of stability in operations—the atmosphere is one of dancing to demand’s tune. Also, when forecast and reality differ, morale can suffer, since it quickly becomes obvious to workers and managers that efforts have been wasted. Figure 11.2 provides a comparison of the two strategies, using a varying demand pattern

FIGURE 11.2 A varying demand pattern and a comparison of a chase demand strategy versus a level strategy

Output level

Level output strategy

Time

Demand

Demand and

output

Demand

Demand and output are

equal; inventory is constant

Demand exceeds output; inventory

is reduced; a stockout may occur

Chase demand strategy (output matches demand)

Normal capacity

TimeOutput is above normal; capacity is

temporarily increased to match demand

Output is below normal; output is

temporarily decreased to match demand

Normal capacity

TimeDemand exceeds normal capacity

Demand equals normal capacity

Demand is less than normal capacity

Demand is less than output;

inventory builds up; any back orders are filled

Inventory

Forecasted demand

Forecasted demand

Output and forecasted demand

Forecasted demand

A. A possible uneven demand pattern

B. Two strategies

ste24102_ch11_456-493.indd 466ste24102_ch11_456-493.indd 466 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

Chapter Eleven Aggregate Planning and Master Scheduling 467

to highlight the differences in the two approaches. The same demand pattern is used for each approach. In the upper portion of the figure the pattern is shown. Notice that there are three situations: (1) demand and capacity are equal; (2) demand is less than capacity; and (3) demand exceeds capacity.

The middle portion of the figure illustrates what happens with a chase approach. When normal capacity would exceed demand, capacity is cut back to match demand. Then, when demand exceeds normal capacity, the chase approach is to temporarily increase capacity to match demand.

The bottom portion of the figure illustrates the level-output strategy. When demand is less than capacity, output continues at normal capacity, and the excess output is put into inventory in anticipation of the time when demand exceeds capacity. When demand exceeds capacity, inventory is used to offset the shortfall in output.

Organizations may opt for a strategy that involves some combination of the pure strate- gies. This allows managers greater flexibility in dealing with uneven demand and perhaps in experimenting with a wide variety of approaches. However, the absence of a clear focus may lead to an erratic approach and confusion on the part of employees.

Choosing a Strategy Whatever strategy an organization is considering, three important factors are company pol- icy, flexibility, and costs. Company policy may set constraints on the available options or the extent to which they can be used. For instance, company policy may discourage lay- offs except under extreme conditions. Subcontracting may not be a viable alternative due to the desire to maintain secrecy about some aspect of the manufacturing of the product (e.g., a secret formula or blending process). Union agreements often impose restrictions. For example, a union contract may specify both minimum and maximum numbers of hours part-time workers can be used. The degree of flexibility needed to use the chase approach may not be present for companies designed for high, steady output, such as refineries and auto assembly plants.

As a rule, aggregate planners seek to match supply and demand within the constraints imposed on them by policies or agreements and at minimum cost. They usually evaluate alter- natives in terms of their overall costs. Table 11.3 compares reactive strategies. In the next sec- tion, a number of techniques for aggregate planning are described and presented with some examples of cost evaluation of alternative plans.

Chase approach Capacities (workforce levels, output rates, etc.) are adjusted to match demand requirements over the

planning horizon. A chase strategy works best when inventory carrying costs are high and costs of changing capacity are low.

Advantages: Investment in inventory is low. Labor utilization is kept high. Disadvantage: The cost of adjusting output rates and/or workforce levels. Level approach Capacities (workforce levels, output rates, etc.) are kept constant over the planning horizon. A level strategy

works best when inventory carrying costs and backlog costs are relatively low. Advantage: Stable output rates and workforce levels. Disadvantages: Greater inventory costs. Increased overtime and idle time. Resource utilizations that vary over time.

TABLE 11.3 Comparison of reactive strategies

ste24102_ch11_456-493.indd 467ste24102_ch11_456-493.indd 467 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

468 Chapter Eleven Aggregate Planning and Master Scheduling

11.3 TECHNIQUES FOR AGGREGATE PLANNING Numerous techniques are available to help with the task of aggregate planning. Generally, they fall into one of two categories: Informal trial-and-error techniques and mathematical techniques. In practice, informal techniques are more frequently used. However, a consider- able amount of research has been devoted to mathematical techniques, and even though they are not as widely used, they often serve as a basis for comparing the effectiveness of alterna- tive techniques for aggregate planning. Thus, it will be instructive to briefly examine them as well as the informal techniques.

A general procedure for aggregate planning consists of the following steps:

1. Determine demand for each period.

2. Determine capacities (regular time, overtime, subcontracting) for each period.

3. Identify company or departmental policies that are pertinent (e.g., maintain a safety stock of 5 percent of demand, maintain a reasonably stable workforce).

4. Determine unit costs for regular time, overtime, subcontracting, holding inventories, back orders, layoffs, and other relevant costs.

5. Develop alternative plans and compute the cost for each.

6. If satisfactory plans emerge, select the one that best satisfies objectives. Otherwise, return to step 5.

It can be helpful to use a worksheet or spreadsheet, such as the one illustrated in Table 11.4 , to summarize demand, capacity, and cost for each plan. In addition, graphs can be used to guide the development of alternatives.

Trial-and-Error Techniques Using Graphs and Spreadsheets Trial-and-error approaches consist of developing simple tables or graphs that enable planners to visually compare projected demand requirements with existing capacity. Alternatives are usually evaluated in terms of their overall costs. The chief disadvantage of such techniques is that they do not necessarily result in the optimal aggregate plan.

Two examples illustrate the development and comparison of aggregate plans. In the first example, regular output is held steady, with inventory absorbing demand variations. In the second example, a lower rate of regular output is used, supplemented by the use of overtime. In both examples, some backlogs are allowed to build up.

These examples and other examples and problems in this chapter are based on the follow- ing assumptions:

1. The regular output capacity is the same in all periods. No allowance is made for holi- days, different numbers of workdays in different months, and so on. This assumption simplifies computations.

2. Cost (back order, inventory, subcontracting, etc.) is a linear function composed of unit cost and number of units. This often has a reasonable approximation to reality, although there may be only narrow ranges over which this is true. Cost is sometimes more of a step function.

3. Plans are feasible; that is, sufficient inventory capacity exists to accommodate a plan, subcontractors with appropriate quality and capacity are standing by, and changes in output can be made as needed.

4. All costs associated with a decision option can be represented by a lump sum or by unit costs that are independent of the quantity involved. Again, a step function may be more realistic; but for purposes of illustration and simplicity, this assumption is appropriate.

5. Cost figures can be reasonably estimated and are constant for the planning horizon.

SCREENCAM TUTORIAL

LO11.4 Describe some of the graphical and quantitative techniques planners use.

ste24102_ch11_456-493.indd 468ste24102_ch11_456-493.indd 468 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

Chapter Eleven Aggregate Planning and Master Scheduling 469

6. Inventories are built up and drawn down at a uniform rate, and output occurs at a uni- form rate throughout each period. However, backlogs are treated as if they exist for an entire period, even though in periods where they initially appear, they would tend to build up toward the end of the period. Hence, this assumption is a bit unrealistic for some periods, but it simplifies computations.

In the examples and problems in this chapter, we use the following relationships to deter- mine the number of workers, the amount of inventory, and the cost of a particular plan.

The number of workers available in any period is calculated as follows:

Number of workers in a period

Number of workers at end of the previous period

Number of new workers at start of the period

Number of laid-off workers at start of the period

� � �

Note: An organization would not hire and lay off simultaneously, so at least one of the last two terms will equal zero.

The amount of inventory at the end of a given period is calculated as follows:

Inventory at the end of a period

Inventory at end of the previous period

Production in the current period

Amount used to satisfy demand in the current period

� � �

The average inventory for a period is equal to

Beginning inventory Ending inventory

2

The cost of a particular plan for a given period can be determined by summing the appro- priate costs:

� �

� � �=Cost fora period Output cost

(Reg OT Subcontract) Hire/lay-off

cost Inventory

cost Backorder

cost

Period

Forecast

Output

Output – Forecast

Regular time

Overtime

Subcontract

Regular

Overtime

Subcontract

Beginning

Ending

Average

Inventory

Inventory

Back orders

Total

Hire/Lay off

Backlog

Costs

Output

1 2 3 4 5 Total

TABLE 11.4 Worksheet/spreadsheet

ste24102_ch11_456-493.indd 469ste24102_ch11_456-493.indd 469 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

470 Chapter Eleven Aggregate Planning and Master Scheduling

The appropriate costs are calculated as follows:

Type of Cost How to Calculate

Output

Regular Regular cost per unit  �  Quantity of regular output

Overtime Overtime cost per unit  �  Overtime quantity

Subcontract Subcontract cost per unit  �  Subcontract quantity

Hire/lay off

Hire Cost per hire  �  Number hired

Lay off Cost per layoff  �  Number laid off

Inventory Carrying cost per unit  �  Average inventory

Back order Backorder cost per unit  �  Number of backorder units

The following examples are only two of many possible options that could be tried. Perhaps some of the others would result in a lower cost. With trial and error, you can never be com- pletely sure you have identified the lowest-cost alternative unless every possible alternative is evaluated. Of course, the purpose of these examples is to illustrate the process of developing and evaluating an aggregate plan rather than to find the lowest-cost plan. Problems at the end of the chapter cover still other alternatives.

In practice, successful achievement of a good plan depends on the resourcefulness and per- sistence of the planner. Computer software such as the Excel templates that accompany this book can eliminate the computational burden of trial-and-error techniques.

Planners for a company that makes several models of skateboards are about to prepare the aggregate plan that will cover six periods. They have assembled the following information:

Period 1 2 3 4 5 6 Total

Forecast 200 200 300 400 500 200 1,800

Costs

Output

Regular time    �  $2 per skateboard

Overtime   �  $3 per skateboard

Subcontract   �  $6 per skateboard

Inventory   �  $1 per skateboard per period on average inventory

Back orders   �  $5 per skateboard per period

They now want to evaluate a plan that calls for a steady rate of regular-time output, mainly using inventory to absorb the uneven demand but allowing some backlog. Overtime and subcontracting are not used because they want steady output. They intend to start with zero inventory on hand in the first period. Prepare an aggregate plan and determine its cost using the preceding information. Assume a level output rate of 300 units (skateboards) per period with regular time (i.e., 1,800/6  �  300). Note that the planned ending inventory is zero. There are 15 workers, and each can produce 20 skateboards per period.

E X A M P L E 1

e celx mhhe.com/stevenson12e

S O L U T I O N Period 1 2 3 4 5 6 Total Forecast 200 200 300 400 500 200 1,800

Output

Regular 300 300 300 300 300 300 1,800

Overtime — — — — — —

Subcontract — — — — — —

Output 2 Forecast 100 100 0 (100) (200) 100 0

Inventory

Beginning 0 100 200 200 100 0

Ending 100 200 200 100 0 0

Average 50 150 200 150 50 0 600

Backlog 0 0 0 0 100 0 100

LO11.5 Prepare aggregate plans and compute their costs.

ste24102_ch11_456-493.indd 470ste24102_ch11_456-493.indd 470 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

Chapter Eleven Aggregate Planning and Master Scheduling 471

Very often, graphs can be used to guide the development of alternatives. Some planners prefer cumulative graphs while others prefer to see a period-by-period breakdown of a plan. For instance, Figure 11.3 shows a cumulative graph for a plan with steady output (the slope of the dashed line represents the production rate) and inventory absorption of demand variations. Figure 11.2 is an example of a period-by-period graph. The obvious advantage of a graph is that it provides a visual portrayal of a plan. The preference of the planner determines which of these two types of graphs is chosen.

Period 1 2 3 4 5 6 Total

Costs

Output

Regular $600 600 600 600 600 600 $3,600

Overtime — — — — — —

Subcontract — — — — — —

Hire/Lay off — — — — — —

Inventory $ 50 150 200 150 50 0 $ 600

Back orders $ 0 0 0 0 500 0 $ 500

Total $650 750 800 750 1,150 600 $4,700

Note that the total regular-time output of 1,800 units equals the total expected demand. Ending inventory equals beginning inventory plus or minus the quantity Output  �  Forecast. If Out- put  �  Forecast is negative, inventory is decreased in that period by that amount. If insufficient inventory exists, a backlog equal to the shortage amount appears, as in period 5. This is taken care of using the excess output in period 6.

The costs were computed as follows: Regular cost in each period equals 300 units  �  $2 per unit or $600. Inventory cost equals average inventory  �  $1 per unit. Backorder cost is $5 per unit. The total cost for this plan is $4,700.

Note that the first two quantities in each column are givens. The remaining quantities in the upper portion of the table were determined working down each column, beginning with the first column. The costs were then computed based on the quantities in the upper part of the table.

After reviewing the plan developed in the preceding example, planners have decided to develop an alternative plan. They have learned that one person is about to retire from the com- pany. Rather than replace that person, they would like to stay with the smaller workforce and use overtime to make up for the lost output. The reduced regular-time output is 280 units per period. The maximum amount of overtime output per period is 40 units. Develop a plan and compare it to the previous one.

E X A M P L E 2

e celx mhhe.com/stevenson12e

FIGURE 11.3 A cumulative graph 2,000

1,600

1,200

800

400

0

C u

m u

la ti

ve o

u tp

u t/

d em

an d

( ag

g re

g at

e u

n it

s)

Period

2 3 4 5 61

Cumulative demand

Surplus output

Demand exceeds output

Cumulative production

ste24102_ch11_456-493.indd 471ste24102_ch11_456-493.indd 471 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

472 Chapter Eleven Aggregate Planning and Master Scheduling

The amount of overtime that must be scheduled has to make up for lost output of 20 units per period for six periods, which is 120. This is scheduled toward the center of the planning horizon because that is where the bulk of demand occurs. Although other amounts and time periods could be used as long as the total equals 120, scheduling it earlier would increase inventory carrying costs; scheduling it later would increase the backlog cost.

Overall, the total cost for this plan is $4,640, which is $60 less than the previous plan. Regular-time production cost and inventory cost are down, but there is overtime cost. How- ever, this plan achieves savings in backorder cost, making it somewhat less costly overall than the plan in Example 1.

Mathematical Techniques A number of mathematical techniques have been developed to handle aggregate planning. They range from mathematical programming models to heuristic and computer search mod- els. This section briefly describes some of the better-known techniques.

Linear Programming. Linear programming (LP) models are methods for obtaining optimal solutions to problems involving the allocation of scarce resources in terms of cost minimization or profit maximization. With aggregate planning, the goal is usually to mini- mize the sum of costs related to regular labor time, overtime, subcontracting, carrying inven- tory, and costs associated with changing the size of the workforce. Constraints involve the capacities of the workforce, inventories, and subcontracting.

The problem can be formulated as a transportation-type programming model as a way to obtain aggregate plans that would match capacities with demand requirements and minimize costs. In order to use this approach, planners must identify capacity (supply) of regular time, overtime, sub- contracting, and inventory on a period-by-period basis, as well as related costs of each variable.

Table 11.5 shows the notation and setup of a transportation table. Note the systematic way that costs change as you move across a row from left to right. Regular cost, overtime cost, and subcontracting cost are at their lowest when the output is consumed (i.e., delivered, etc.) in the same period it is produced (at the intersection of period 1 row and column for regular cost, at the intersection of period 2 row and column for regular cost, and so on). If goods are made available in one period but carried over to later periods (i.e., moving across a row), holding costs are incurred at the rate of h per period. Thus, holding goods for two periods results in a unit cost of 2 h, whether or not the goods came from regular production, overtime, or subcontracting. Conversely, with back orders, the unit cost increases as you move across a

SCREENCAM TUTORIAL

S O L U T I O N Period 1 2 3 4 5 6 Total Forecast 200 200 300 400 500 200 1,800

Output

Regular 280 280 280 280 280 280 1,680

Overtime 0 0 40 40 40 0 120

Subcontract — — — — — —

Output – Forecast 80 80 20 (80) (180) 80 0

Inventory

Beginning 0 80 160 180 100 0

Ending 80 160 180 100 0 0

Average 40 120 170 140 50 0 520

Backlog 0 0 0 0 80 0 80

Costs

Output

Regular $560 560 560 560 560 560 $3,360

Overtime 0 0 120 120 120 0 $ 360

Subcontract — — — — — —

Hire/Lay off — — — — — —

Inventory 40 120 170 140 50 0 $ 520

Back orders $ 0 0 0 0 400 0 $ 400

Total $600 680 850 820 1,130 560 $4,640

ste24102_ch11_456-493.indd 472ste24102_ch11_456-493.indd 472 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

Chapter Eleven Aggregate Planning and Master Scheduling 473

row from right to left, beginning at the intersection of a row and column for the same period (e.g., period 3). For instance, if some goods are produced in period 3 to satisfy back orders from period 2, a unit backorder cost of b is incurred. And if goods in period 3 are used to sat- isfy back orders two periods earlier (e.g., from period 1), a unit cost of 2 b is incurred. Unused capacity is generally given a unit cost of 0, although it is certainly possible to insert an actual cost if that is relevant. Finally, beginning inventory is given a unit cost of 0 if it is used to sat- isfy demand in period 1. However, if it is held over for use in later periods, a holding cost of h per unit is added for each period. If the inventory is to be held for the entire planning horizon, a total unit cost of h times the number of periods, n, will be incurred.

Example 3 illustrates the setup and final solution of a transportation model of an aggregate planning problem.

Period 1

Period 2

Period 3

Unused capacity

Ending inventory period n

Capacity

Pe rio

d Beginning inventory

1

2

Demand Total

3

. . .

. . .

. . .

. . .

. . .

. . .

. . .

. . .

. . .

. . .

. . .

. . .

0 h 2h (n – 1)h 0

r + (n – 1)h

t + (n – 1)h

s + (n – 1)h

0

0

0

r + (n – 2)h 0

t + (n – 2)h 0

s + (n – 2)h 0

r + (n – 3)h 0

t + (n – 3)h 0

s + (n – 3)h 0

r r + h r + 2h

t t + h t + 2h

s s + h s + 2h

r + b r r + h

t + b t t + h

s + b s s + h

r + 2b r + b r

t + 2b t + b t

s + 2b s + b s

I0

R1

R2

R3

O1

O2

O3

S1

S2

S3

Regular time

Overtime

Subcontract

Regular time

Overtime

Subcontract

Regular time

Overtime

Subcontract

TABLE 11.5 Transportation notation for aggregate planning

r   �  Regular production cost per unit

t   �  Overtime cost per unit

s   �  Subcontracting cost per unit

h   �  Holding cost per unit period

b   �  Backorder cost per unit per period

n   �  Number of periods in planning horizon

Given the following information, set up the problem in a transportation table (see Table 11.6) and solve for the minimum-cost plan:

PERIOD

1 2 3

Demand 550 700 750

Capacity

Regular 500 500 500

Overtime 50 50 50

Subcontract 120 120 100

Beginning inventory 100

Costs

Regular time $60 per unit

Overtime $80 per unit

Subcontract $90 per unit

Inventory carrying cost $1 per unit per month

Backorder cost $3 per unit per month

E X A M P L E 3

e celx mhhe.com/stevenson12e

ste24102_ch11_456-493.indd 473ste24102_ch11_456-493.indd 473 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

474 Chapter Eleven Aggregate Planning and Master Scheduling

Where backlogs are not permitted, the cell costs for the backlog positions can be made prohibitively high so that no backlogs will appear in the solution.

The main limitations of LP models are the assumptions of linear relationships among vari- ables, the inability to continuously adjust output rates, and the need to specify a single objec- tive (e.g., minimize costs) instead of using multiple objectives (e.g., minimize cost while stabilizing the workforce).

S O L U T I O N The transportation table and solution are shown in Table 11.6 . Some of the entries require additional explanation:

a. In this example, inventory carrying costs are $1 per unit per period (costs are shown in the upper right-hand corner of each cell in the table). Hence, units produced in one period and carried over to a later period will incur a holding cost that is a linear function of the length of time held.

b. Linear programming models of this type require that supply (capacity) and demand be equal. A dummy column has been added (nonexistent capacity) to satisfy that require- ment. Since it does not “cost” anything extra to not use capacity that doesn’t actually exist, cell costs of $0 have been assigned.

c. No backlogs were needed in this example.

d. The quantities (e.g., 100 and 450 in column 1) are the amounts of output or inventory that will be used to meet demand requirements. Thus, the demand of 550 units in period 1 will be met using 100 units from inventory and 450 obtained from regular-time output.

TABLE 11.6 Transportation solution

Supply from

Demand for

Period 1

Period 2

Period 3

Unused capacity (dummy)

Total capacity available (supply)

P er

io d

Beginning inventory

Regular time

Overtime

Subcontract

0 1 2 0

100

450 50

50

500

50

20 100

500

50

100

50

30 90

500

120

50

500

120

50

500

550 700 750 90 2,090

100

100

60 61 62 0

63 60 61 0

66 63 60 0

86 83 80 0

96 93 90 0

83 80 81 0

93 90 91 0

80 81 82 0

90 91 92 0

1

Regular time

Overtime

Subcontract

2

Regular time

Overtime

Subcontract

Demand

3

ste24102_ch11_456-493.indd 474ste24102_ch11_456-493.indd 474 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

Chapter Eleven Aggregate Planning and Master Scheduling 475

Simulation Models. A number of simulation models have been developed for aggregate planning. (An introduction to simulation is available on the textbook Web site.) The essence of simulation is the development of computerized models that can be tested under a variety of conditions in an attempt to identify reasonably acceptable (although not always optimal) solutions to problems.

Table 11.7 summarizes planning techniques. Aggregate planning techniques other than trial and error do not appear to be widely used.

Instead, in the majority of organizations, aggregate planning seems to be accomplished more on the basis of experience along with trial-and-error methods. It is difficult to say exactly why some of the mathematical techniques mentioned are not used to any great extent. Perhaps the level of mathematical sophistication discourages greater use, or the assumptions required in certain models appear unrealistic, or the models may be too narrow in scope. Whatever the reasons, none of the techniques to date have captured the attention of aggregate planners on a broad scale. Simulation is one technique that seems to be gaining favor. Research on improved approaches to aggregate planning is continuing.

11.4 AGGREGATE PLANNING IN SERVICES Aggregate planning for services takes into account projected customer demands, equipment capacities, and labor capabilities. The resulting plan is a time-phased projection of service staff requirements.

Here are examples of service organizations that use aggregate planning:

Hospitals: Hospitals use aggregate planning to allocate funds, staff, and supplies to meet the demands of patients for their medical services. For example, plans for bed capacity, medications, surgical supplies, and personnel needs are based on patient load forecasts.

Airlines: Aggregate planning in the airline industry is fairly complex due to the need to take into account a wide range of factors (planes, flight personnel, ground personnel) and multiple routes and landing/departure sites. Also, capacity decisions must take into account the percentage of seats to be allocated to various fare classes in order to maxi- mize profit or yield.

Restaurants: Aggregate planning in the case of a high-volume product output business such as a restaurant is directed toward smoothing the service rate, determining the size of the workforce, and managing demand to match a fixed kitchen and eating capacity. The general approach usually involves adjusting the number of staff according to the time of day and the day of the week.

Other services: Financial, hospitality, transportation, and recreation services provide a high-volume, intangible output. Aggregate planning for these and similar services involves managing demand and planning for human resource requirements. The main goals are to accommodate peak demand and to find ways to effectively use labor resources during periods of low demand.

Simulation models  Comput- erized models that can be tested under different scenarios to identify acceptable solutions to problems.

TABLE 11.7 Summary of planning techniques

LO11.6 Discuss aggregate planning in services.

Technique Solution Approach Characteristics

Spreadsheet Heuristic (trial and error) Intuitively appealing, easy to understand; solution not necessarily optimal

Linear programming Optimizing Computerized; linear assumptions not always valid

Simulation Heuristic (trial and error) Computerized models can be examined under a variety of conditions

ste24102_ch11_456-493.indd 475ste24102_ch11_456-493.indd 475 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

476 Chapter Eleven Aggregate Planning and Master Scheduling

Lunchtime line of people at Chacarero, a popular fast- food Chilean restaurant at Downtown Crossing, Boston, Massachussetts. Predicting steady demand from nearby office workers makes it much easier to provide staffing and prompt food service.

Aggregate planning for manufacturing and aggregate planning for services share similarities in some respects, but there are some important differences—related in general to the differences between manufacturing and services:

1. Demand for service can be difficult to predict. The volume of demand for services is often quite variable. In some situations, customers may need prompt service (e.g., police, fire, medical emergency), while in others, they simply want prompt service and may be willing to go elsewhere if their wants are not met. These factors place a greater burden on service providers to anticipate demand. Consequently, service providers must pay careful attention to planned capacity levels.

2. Capacity availability can be difficult to predict. Processing requirements for ser- vices can sometimes be quite variable, similar to the variability of work in a job shop setting. Moreover, the variety of tasks required of servers can be great, again similar to the variety of tasks in a job shop. However, in services, the types of variety are more pervasive than they are in manufacturing. This makes it more difficult to establish simple measures of capacity. For example, what would be the capacity of a person who paints interiors of houses? The number of rooms per day or the number of square feet per hour are possible measures, but rooms come in many different sizes, and because the level of detail (and, thus, the painting implements that can be used) vary tremendously, a suitable measure for planning purposes can be quite difficult to arrive at. Similarly, bank tellers are called upon to handle a wide variety of transactions and requests for information, again making it difficult to establish a suitable measure of their capacity.

3. Labor flexibility can be an advantage in services. Labor often comprises a signifi- cant portion of service compared to manufacturing. That, coupled with the fact that service providers are often able to handle a fairly wide variety of service require- ments, means that to some extent, planning is easier than it is in manufacturing. Of course, manufacturers recognize this advantage, and many are cross-training their employees to achieve the same flexibility. Moreover, in both manufacturing and service systems, the use of part-time workers can be an important option. Note that in self-service systems, the (customer) labor automatically adjusts to changes in demand!

ste24102_ch11_456-493.indd 476ste24102_ch11_456-493.indd 476 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

Chapter Eleven Aggregate Planning and Master Scheduling 477

4. Services occur when they are rendered. Unlike manufacturing output, most ser- vices can’t be inventoried. Services such as financial planning, tax counseling, and oil changes can’t be stockpiled. This removes the option of building up inventories during a slow period in anticipation of future demand. Moreover, service capacity that goes unused is essentially wasted. Consequently, it becomes even more important to be able to match capacity and demand.

Because service capacity is perishable (e.g., an empty seat on an airplane flight can’t be saved for use on another flight), aggregate planners need to take that into account when deciding how to match supply and demand. Yield management is an approach that seeks to maximize revenue by using a strategy of variable pricing; prices are set relative to capacity availability. Thus, during periods of low demand, price discounts are offered to attract a wider population. Conversely, during peak periods, higher prices are posted to take advantage of limited supply relative to demand. Users of yield management include airlines, restaurants, theaters, hotels, resorts, cruise lines, and parking lots.

11.5 DISAGGREGATING THE AGGREGATE PLAN For the production plan to be translated into meaningful terms for production, it is necessary to disaggregate the aggregate plan. This means breaking down the aggregate plan into specific product requirements in order to determine labor requirements (skills, size of workforce), materials, and inventory requirements.

Working with aggregate units facilitates intermediate planning. However, to put the pro- duction plan into operation, one must convert, or disaggregate, those aggregate units into units of actual products or services that are to be produced or offered. For example, a lawn mower manufacturer may have an aggregate plan that calls for 200 riding mowers in January, 300 in February, and 400 in March. That company may produce three different models of rid- ing mowers. Although all the mowers probably contain some of the same parts and involve some similar or identical operations for fabrication and assembly, there would be some dif- ferences in the materials, parts, and operations that each type requires. Hence, the 200, 300, and 400 aggregate lawn mowers that are to be produced during those three months must be translated into specific numbers of mowers of each model prior to actually purchasing the appropriate materials and parts, scheduling operations, and planning inventory requirements.

The result of disaggregating the aggregate plan is a master production schedule (MPS) , or simply master schedule, showing the quantity and timing of specific end items for a sched- uled horizon, which often covers about six to eight weeks ahead. A master schedule shows the planned output for individual products rather than an entire product group, along with the tim- ing of production. The master schedule contains important information for marketing as well as for production. It reveals when orders are scheduled for production and when completed orders are to be shipped.

Figure 11.4 shows an overview of the context of disaggregation. Figure 11.5 illustrates disaggregating the aggregate plan. The illustration makes a simple

assumption in order to clearly show the concept of disaggregation: The totals of the aggregate and the disaggregated units are equal. In reality, that is not always true. As a consequence, disaggregating the aggregate plan may require considerable effort.

Figure 11.5 shows the aggregate plan broken down by units. However, it also can be useful to show the breakdown in percentages for different products or product families.

11.6 MASTER SCHEDULING The master schedule is the heart of production planning and control. It determines the quanti- ties needed to meet demand from all sources, and that governs key decisions and activities throughout the organization.

Yield management  The application of pricing strategies to allocate capacity among various categories of demand.

Master production schedule (MPS)  This schedule indi- cates the quantity and timing of planned completed production.

FIGURE 11.4 Moving from the aggregate plan to a master production schedule

Aggregate planning

Disaggregation

Master schedule

LO11.7 Disaggregate an aggregate plan.

ste24102_ch11_456-493.indd 477ste24102_ch11_456-493.indd 477 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

478 Chapter Eleven Aggregate Planning and Master Scheduling

The master schedule interfaces with marketing, capacity planning, production plan- ning, and distribution planning: It enables marketing to make valid delivery commitments to warehouses and final customers; it enables production to evaluate capacity requirements; it provides the necessary information for production and marketing to negotiate when cus- tomer requests cannot be met by normal capacity; and it provides senior management with the opportunity to determine whether the business plan and its strategic objectives will be achieved. The master schedule also drives the material requirements planning (MRP) system that will be discussed in the next chapter.

The capacities used for master scheduling are based on decisions made during aggregate planning. Note that there is a time lapse between the time the aggregate plan is made and the development of a master schedule. Consequently, the outputs shown in a master schedule will not necessarily be identical to those of the aggregate plan for the simple reason that more up-to-date demand information might be available, which the master schedule would take into account.

The central person in the master scheduling process is the master scheduler.

The Master Scheduler Most manufacturing organizations have (or should have) a master scheduler. The duties of the master scheduler generally include

1. Evaluating the impact of new orders.

2. Providing delivery dates for orders.

3. Dealing with problems: a. Evaluating the impact of production delays or late deliveries of purchased goods. b. Revising the master schedule when necessary because of insufficient supplies or capacity. c. Bringing instances of insufficient capacity to the attention of production and marketing

personnel so that they can participate in resolving conflicts.

11.7 THE MASTER SCHEDULING PROCESS A master schedule indicates the quantity and timing (i.e., delivery times) for a product, or a group of products, but it does not show planned production. For instance, a master schedule may call for delivery of 50 cases of cranberry-apple juice to be delivered on May 1. But this may not require any production; there may be 200 cases in inventory. Or it may require some production: If there were 40 cases in inventory, an additional 10 cases would be needed to achieve the specified delivery amount. Or it may involve production of 50 or more cases: In some instances, it is more economical to produce large amounts rather than small amounts, with the excess temporarily placed in inventory until needed. Thus, the production lot size might be 70 cases, so if additional cases were needed (e.g., 50 cases), a run of 70 cases would be made.

The master production schedule is one of the primary outputs of the master scheduling process, as illustrated in Figure 11.6 .

LO11.8 Describe the master scheduling process and explain its importance.

Aggregate plan Month Planned output * Jan. Feb. Mar.

200 300 400

* Aggregate units

Master schedule Month Planned output * Jan. Feb. Mar.

RMa 100 100 100 RMb 75 150 200 RMc 25 50 100 Total 200 300 400

* Actual units

FIGURE 11.5 Disaggregating the aggregate plan

ste24102_ch11_456-493.indd 478ste24102_ch11_456-493.indd 478 11/29/13 12:00 AM11/29/13 12:00 AM

Final PDF to printer

Chapter Eleven Aggregate Planning and Master Scheduling 479

Once a tentative master schedule has been developed, it must be validated. This is an extremely important step. Validation is referred to as rough-cut capacity planning (RCCP) . It involves testing the feasibility of a proposed master schedule relative to available capacities, to assure that no obvious capacity constraints exist. This means checking capacities of production and warehouse facilities, labor, and vendors to ensure that no gross deficiencies exist that will render the master schedule unworkable. The master pro- duction schedule then serves as the basis for short-range planning. It should be noted that whereas the aggregate plan covers an interval of, say, 12 months, the master schedule cov- ers only a portion of this. In other words, the aggregate plan is disaggregated in stages, or phases, that may cover a few weeks to two or three months. Moreover, the master sched- ule may be updated monthly, even though it covers two or three months. For instance, the lawn mower master schedule would probably be updated at the end of January to include any revisions in planned output for February and March as well as new information on planned output for April.

Time Fences Changes to a master schedule can be disruptive, particularly changes to the early, or near, por- tions of the schedule. Typically, the further out in the future a change is, the less the tendency to cause problems.

High-performance organizations have an effective master scheduling process. A key compo- nent of effective scheduling is the use of time fences to facilitate order promising and the entry of orders into the system. Time fences divide a scheduling time horizon into three sections or phases, sometimes referred to as frozen, slushy, and liquid, in reference to the firmness of the schedule (see Figure 11.7 ).

Frozen is the near-term phase that is so soon that delivery of a new order would be impos- sible, or only possible using very costly or extraordinary options such as delaying another order. Authority for new-order entry in this phase usually lies with the VP of manufacturing. The length of the frozen phase is often a function of the total time needed to produce a prod- uct, from procuring materials to shipping the order. There is a high degree of confidence in order-promise dates.

Slushy is the next phase, and its time fence is usually a few periods beyond the frozen phase. Order entry in this phase necessitates trade-offs, but is less costly or disruptive than in the frozen phase. Authority for order entry usually lies with the master scheduler. There is relative confidence in order-promise dates, and capacity planning becomes very specific.

Liquid is the farthest out on the time horizon. New orders or cancellations can be entered with ease. Order promise dates are tentative, and will be firmed up with the passage of time when orders are in the firm phase of the schedule horizon.

A key element in the success of the master scheduling process is strict adherence to time fence policies and rules. It is essential that they be adhered to and communicated throughout the organization.

Rough-cut capacity planning (RCCP)  Approximate balancing of capacity and demand to test the feasibility of a master schedule.

Time fences  Points in time that separate phases of a master schedule planning horizon.

FIGURE 11.6 The master scheduling process Beginning inventory

Forecast

Customer orders

Projected inventory of finished goods

Master production schedule

Uncommitted inventory

Inputs Outputs

Master scheduling

FIGURE 11.7 Time fences in an MPS

Period

frozen (firm or fixed)

slushy (somewhat

firm)

liquid (open)

1 2 3 4 5 6 7 8 9

ste24102_ch11_456-493.indd 479ste24102_ch11_456-493.indd 479 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

480 Chapter Eleven Aggregate Planning and Master Scheduling

Inputs The master schedule has three inputs: the beginning inventory, which is the actual quantity on hand from the preceding period; forecasts for each period of the schedule; and customer orders, which are quantities already committed to customers. Other factors that might need to be taken into consideration include any hiring or firing restrictions imposed by HR, skill levels, limits on inventory such as available space, whether items are perishable, and whether there are some market lifetime (e.g., seasonal or obsolescence) considerations.

Outputs The master scheduling process uses this information on a period-by-period basis to determine the projected inventory, production requirements, and the resulting uncommitted inventory, which is referred to as available-to-promise (ATP) inventory . Knowledge of the uncommitted inventory can enable marketing to make realistic promises to customers about deliveries of new orders.

The master scheduling process begins with a preliminary calculation of projected on-hand inventory. This reveals when additional inventory (i.e., production) will be needed. Consider this example. A company that makes industrial pumps wants to prepare a master production schedule for June and July. Marketing has forecasted demand of 120 pumps for June and 160 pumps for July. These have been evenly distributed over the four weeks in each month: 30 per week in June and 40 per week in July, as illustrated in Figure 11.8 A.

Now, suppose that there are currently 64 pumps in inventory (i.e., beginning inventory is 64 pumps), and that there are customer orders that have been committed (booked) and must be filled (see Figure 11.8B) .

Figure 11.8 B contains the three primary inputs to the master scheduling process: the begin- ning inventory, the forecast, and the customer orders that have been booked or committed. This information is necessary to determine three quantities: the projected on-hand inventory, the master production schedule, and the uncommitted (ATP) inventory. The first step is to calculate the projected on-hand inventory, one week at a time, until it falls below a speci- fied limit. In this example, the specified limit will be zero. Hence, we will continue until the projected on-hand ending inventory becomes negative.

The projected on-hand inventory is calculated as follows:

� � Projected on-hand

inventory Inventory from previous week

Current week’s requirements (11–1)

where the current week’s requirements are the larger of forecast and customer orders (committed).

Available-to-promise (ATP) inventory  Uncommitted inventory.

FIGURE 11.8A Weekly forecast requirements for industrial pumps

Forecast

June July

1 2 3 4 5 6 7 8

30 30 30 30 40 40 40 40

FIGURE 11.8B Eight-week schedule showing forecasts, customer orders, and beginning inventory

Forecast

Customer orders (committed)

June July

1 2 3 4 5 6 7 8

30 30 30 30 40 40 40 40

33 20 10 4 2

64

Beginning inventory

ste24102_ch11_456-493.indd 480ste24102_ch11_456-493.indd 480 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

Chapter Eleven Aggregate Planning and Master Scheduling 481

For the first week, projected on-hand inventory equals beginning inventory minus the larger of forecast and customer orders. Because customer orders (33) are larger than the fore- cast (30), the customer orders amount is used. Thus, for the first week, we obtain

Projected on-hand inventory 64 33 31� � �

Projected on-hand inventories are shown in Figure 11.9 for the first three weeks (i.e., until the projected on-hand amount becomes negative).

When the projected on-hand inventory becomes negative, this is a signal that production will be needed to replenish inventory. Hence, a negative projected on-hand inventory will require planned production. Suppose that a production lot size of 70 pumps is used, so that whenever production is called for, 70 pumps will be produced. (The determination of lot size is described in Chapter 13.) Hence, the negative projected on-hand inventory in the third week will require production of 70 pumps, which will meet the projected shortfall of 29 pumps and leave 41 (i.e., 70  �  29  �  41) pumps for future demand.

These calculations continue for the entire schedule. Every time projected inventory becomes negative, another production lot of 70 pumps is added to the schedule. Figure 11.10 illustrates the calculations. The result is the master schedule and projected on-hand inventory for each week of the schedule. These can now be added to the master schedule (see Figure 11.11 ).

FIGURE 11.9 Projected on-hand inventory is computed week by week until it becomes negative

Beginning inventory

Forecast

Customer orders (committed)

Projected on-hand inventory

June July

1 2 3 4 5 6 7 8

30 30 30 30 40 40 40 40

33 20 10 4 2

31 1 –29

64

Customer orders are larger than forecast in week 1; projected on-hand inventory is 64 – 33 = 31

Forecast is larger than customer orders in week 2; projected on-hand inventory is 31 – 30 = 1

Forecast is larger than customer orders in week 3; projected on-hand inventory is 1 – 30 = –29

FIGURE 11.10 Determining the MPS and projected on-hand inventory

Week

Inventory from

Previous Week Requirements *

Net Inventory

before MPS

(70) MPS

Projected Inventory

1 64 33 31 31 2 31 30 1 1 3 1 30 � 29 � 70 � 41

4 41 30 11 11 5 11 40 � 29 � 70 � 41

6 41 40 1 1 7 1 40 � 39 � 70 � 31

8 31 40 � 9 � 70 � 61

*Requirements equals the larger of forecast and customer orders in each week.

ste24102_ch11_456-493.indd 481ste24102_ch11_456-493.indd 481 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

482 Chapter Eleven Aggregate Planning and Master Scheduling

It is now possible to determine the amount of inventory that is uncommitted and, hence, available to promise. Several methods are used in practice. The one we shall employ involves a “look-ahead” procedure: Sum booked customer orders week by week until (but not includ- ing) a week in which there is an MPS amount. For example, in the first week, this procedure results in summing customer orders of 33 (week 1) and 20 (week 2) to obtain 53. In the first week, this amount is subtracted from the beginning inventory of 64 pumps plus the MPS (zero in this example) to obtain the amount that is available to promise. Thus,

64 0 (33 20) 11� � � �

This inventory is uncommitted, and it can be delivered in either week 1 or 2, or part can be delivered in week 1 and part in week 2. (Note that the ATP quantity is only calculated for the first week and for other weeks in which there is an MPS quantity. Hence, it is calculated for weeks 1, 3, 5, 7, 8.) See Figure 11.12 .

For weeks other than the first week, the beginning inventory drops out of the computation, and ATP is the look-ahead quantity subtracted from the MPS quantity.

Thus, for week 3, the promised amounts are 10  �  4  �  14, and the ATP is 70  �  14  �  56. For week 5, customer orders are 2 (future orders have not yet been booked). The ATP is

70  �  2  �  68. For weeks 7 and 8, there are no customer orders, so for the present, all of the MPS amount

is available to promise. As additional orders are booked, these would be entered in the schedule, and the ATP

amounts would be updated to reflect those orders. Marketing can use the ATP amounts to provide realistic delivery dates to customers.

FIGURE 11.11 Projected on-hand inventory and MPS are added to the master schedule

Forecast

Customer orders (committed)

Projected on-hand inventory

MPS

June July

1 2 3 4 5 6 7 8

30 30 30 30 40 40 40 40

33 20 10 4 2

31 1 41 11 41 1 31 61

70 70 70 70

64

FIGURE 11.12 The available-to-promise inventory quantities have been added to the master schedule

Forecast

Customer orders (committed)

Projected on-hand inventory

MPS

Available-to- promise inventory (uncommitted)

June July

1 2 3 4 5 6 7 8

30 30 30 30 40 40 40 40

33 20 10 4 2

31 1 41 11 41 1 31 61

70 70 70 70

11 56 68 70 70

64

ste24102_ch11_456-493.indd 482ste24102_ch11_456-493.indd 482 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

Chapter Eleven Aggregate Planning and Master Scheduling 483

Aggregate planning establishes general levels of employment, output, and inventories for periods of 2 to 12 months. In the spectrum of planning, it falls between the broad decisions of long-range planning and the very specific and detailed short-range planning decisions. It begins with an overall forecast for the planning horizon and ends with preparations for applying the plans to specific products and services.

The essence of aggregate planning is the aggregation of products or services into one “product” or “service.” This permits planners to consider overall levels of employment and inventories without having to become involved with specific details that are better left to short-range planning. Planners often use informal graphic and charting techniques to develop plans, although various mathematical techniques have been suggested. It appears that the complexity and the restrictive assumptions of these techniques limit their widespread use in practice.

After the aggregate plan has been developed, it is disaggregated or broken down into specific prod- uct requirements. This leads to a master schedule, which indicates the planned quantities and timing of specific outputs. Inputs to the master schedule are on-hand inventory amounts, forecasts of demand, and customer orders. The outputs are projected production and inventory requirements, and the projected uncommitted inventory, which is referred to as available-to-promise (ATP) inventory.

SUMMARY

1. An aggregate plan is an intermediate-range plan for a collection of similar products or services that sets the stage for shorter-range plans. See Table 11.8 for a convenient summary of aggregate planning.

2. Master scheduling breaks an aggregate plan into specific shorter-range output quantity and timing requirements.

KEY POINTS

Purpose Decide on the combination of Output rates Employment levels On-hand inventory levels Objectives Minimize cost Others, may include Maintain a desirable level of customer service Minimize workforce fluctuations Possible Strategies A. Supply Management (reactive) Level Production Allow inventory to absorb variations in demand Use backordering during periods of high demand Chase Production Vary output by varying the number of workers by hiring or layoffs to track demand Vary output throughout the use of overtime or idle time Vary output using part-time workers Use subcontracting to supplement output Mixed Strategy Use a combination of level and chase approaches B. Demand Management (proactive) Influence demand through promotion, pricing, etc. Produce goods or services that have complementary demand patterns Managerial Importance of Aggregate Planning Has an effect on Costs Equipment utilization Customer satisfaction Employment levels Synchronization of flow throughout the supply chain

TABLE 11.8 Summary of aggregate planning

ste24102_ch11_456-493.indd 483ste24102_ch11_456-493.indd 483 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

484 Chapter Eleven Aggregate Planning and Master Scheduling

aggregate planning, 457 available-to-promise (ATP) inventory, 480 chase demand strategy, 465 level capacity strategy, 465

master production schedule (MPS), 477 rough-cut capacity planning (RCCP), 479

sales and operations planning, 457 simulation models, 475 time fences, 479 yield management, 477

KEY TERMS

a. Rough-cut capacity planning tests the feasibility of a tentative master plan in terms of capacity. b. Time fences describe the various time periods in terms of the degree to which the master schedule is

firm or flexible. Early periods do not generally allow changes, while later periods have more flexibility.

3. It is essential to include the entire supply chain when developing the aggregate plan.

SOLVED PROBLEMS

A manager is attempting to put together an aggregate plan for the coming nine months. She has obtained a forecast of expected demand for the planning horizon. The plan must deal with highly seasonal demand; demand is relatively high in periods 3 and 4 and again in period 8, as can be seen from the following forecasts:

Problem 1

Period 1 2 3 4 5 6 7 8 9 Total

Forecast 190 230 260 280 210 170 160 260 180 1,940

The department now has 20 full-time employees, each of whom produces 10 units of output per period at a cost of $6 per unit. Beginning inventory for period 1 is zero. Inventory carrying cost is $5 per unit per period, and backlog cost is $10 per unit per period.

a. Will the current work force be able to handle the forecast demand?

b. Determine the total cost of the plan, including production, inventory, and backorder costs.

a. With the current workforce of 20 people each producing 10 units per period, regular capacity is 1,800 units for the 9-month period. That is 140 units less than expected demand. So there will be a backlog of unfilled demand if actual demand equals the forecast.

b. The production plan is

Solution

Period 1 2 3 4 5 6 7 8 9 Total

Forecast 190 230 260 280 210 170 160 260 180 1,940

Output

Regular 200 200 200 200 200 200 200 200 200 1,800

Overtime — — — — — — — — — —

Subcontract — — — — — — — — — —

Output  �  Forecast 10 (30) (60) (80) (10) 30 40 (60) 20 (140)

Inventory

Beginning 0 10 0 0 0 0 0 20 0

Ending 10 0 0 0 0 0 20 0 0

Average 5 5 10 0 0 0 10 10 0 10

Backlog 0 20 80 160 170 140 100 160 140 970

Costs

Output

Regular @ $6 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 $10,800

Overtime

Subcontract

Inventory @ $5 $ 25 $ 25 0 0 0 0 0 0 0 $ 50

Back order @ $10 0 $ 200 800 1,600 1,700 1,400 1,000 1,600 1,400 $ 9,700

Total $1,225 1,425 2,000 2,800 2,900 2,600 2,200 2,800 2,600 $20,550

ste24102_ch11_456-493.indd 484ste24102_ch11_456-493.indd 484 11/19/13 12:42 PM11/19/13 12:42 PM

Final PDF to printer

Chapter Eleven Aggregate Planning and Master Scheduling 485

The total cost for this plan is $20,550. This plan may or may not be good. The manager would need information on other costs and options before settling on one plan.

Although the calculations are relatively straightforward, the backlogs can sometimes seem dif- ficult to obtain. Consider these rules for computing the backlog:

1. Start with the Output  �  Forecast value. If this is positive and there was a backlog in the preced- ing period, reduce the backlog by this amount. If the amount exceeds the backlog, the difference becomes the ending inventory for the period. If they are exactly equal, the backlog and the end- ing inventory will both be equal to zero.

2. If Output  �  Forecast is negative, subtract it from the beginning inventory. If this produces a negative value, that value becomes the backlog for that period.

You also can use the Excel template Aggregate Planning (B) to obtain the solution:

Spring and Summer Fashions, a clothing producer, has generated a forecast for the next eight weeks. Demand is expected to be fairly steady, except for periods 3 and 4, which have higher demands:

Problem 2

Period 1 2 3 4 5 6 7 8 Total

Forecast 1,200 1,200 1,400 3,000 1,200 1,200 1,200 1,200 11,600

The company typically hires seasonal workers to handle the extra workload in periods 3 and 4. The cost for hiring and training a seasonal worker is $50 per worker, and the company plans to hire two additional workers and train them in period 3, for work in period 4, and then lay them off (no cost for layoff). Develop an aggregate plan that uses steady output from regular workers with added output from the two seasonal workers in period 4. The output rate for the seasonal workers is slightly less than that of regular workers, so their cost per unit is higher. The cost per unit for regular workers is $4 per unit, while cost per unit for the seasonal workers is $5 per unit. Backlog cost is $1 per unit per period.

Period 1 2 3 4 5 6 7 8 9 Total

Forecast 190 230 260 280 210 170 160 260 180 1,940

Output

Regular Part 200 200 200 200 200 200 200 200 200 1,800

Time 0

Overtime 0

Subcontract 0

Output � Forecast 10 �30 �60 �80 �10 30 40 �60 20 �140

Inventory

Beginning 0 10 0 0 0 0 0 0 0 10

Ending 10 0 0 0 0 0 0 0 0

Average 5 5 0 0 0 0 0.0 0.0 0.0

Backlog 0 20 80 160 170 140 100 160 140 970

Costs

Regular @ 6 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $1,200 $10,800

Part Time @ $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

Overtime @ $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

Subcontract @ $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

Hire/Layoff $ 0

Inventory @ 5 $ 25 $ 25 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 50

Back orders @ 10 $ 0 $ 200 $800 $1,600 $1,700 $1,400 $1,000 $1,600 $1,400 $ 9,700

Total $1,225 $1,425 $2,000 $2,800 $2,900 $2,600 $2,200 $2,800 $2,600 $20,550

ste24102_ch11_456-493.indd 485ste24102_ch11_456-493.indd 485 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

486 Chapter Eleven Aggregate Planning and Master Scheduling

Solution

Prepare a schedule like that shown in Figure 11.12 for the following situation: The forecast for each period is 70 units. The starting inventory is zero. The MPS rule is to schedule production if the pro- jected inventory on hand is negative. The production lot size is 100 units. The following table shows committed orders.

Problem 3

 Starting Inv.  �  0 1 2 3 4

Forecast 70 70 70 70

Customer orders 80 50 30 10

Projected on-hand inventory 20 50 80 10

MPS 100 100 100 0

ATP 20 50 60 0

Period Customer Orders

1 80

2 50

3 30

4 10

Solution Period

(A) Projected Inventory

from Previous Period

(B)

Requirements *

 (C  �  A  �  B) Net Inventory before MPS MPS

 (MPS  �  C) Projected On-

Hand Inventory

1 0 80 (80) 100 20

2 20 70 (50) 100 50

3 50 70 (20) 100 80

4 80 70 10 0 10

*Requirements equal the larger of forecast and customer orders in each period.

Week 0 1 2 3 4 5 6 7 8

Forecast 70 70 70 70

Customer Orders (committed) 80 50 30 10

Projected on-hand inventory 20 50 80 10 10 10 10 10

MPS 100 100 100

ATP 20 50 60

You could also obtain the same solution using the Excel template for master scheduling:

Period Forecast Output

Regular Part Time Overtime Subcontract

Output - Forecast Inventory

Beginning Ending Average

Backlog Costs :

Regular Part Time OverTime Subcontract Hire/Layoff Inventory Back orders

Total

@ 4 5

50 100 100

1 0 4,800.0 4,800.0 5,100.0 4,800.014,800 4,800.0 4,800.0 4,800.0 48,700.0

0.0 0

0.0 200 0 0.0 0.0

0 0.0

0 0.0

0 0.0

0 0.0

200 0.0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0

0 0

0

0 0

10,000 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 38,400

10,000

0

0 0

0

1,200 1,200 1,200 1,200 2,000

1,200 1,200 1,200 1,200 9,600 2,000

0 0

0 0 0 0 0 0

1,200 1,200 1,200 1,200 1,200 1,200 11,6001,400 3,000 1 2 3 4 5 6 7 8 Total

0.0 0

0 0

0.0

-200 200

200

0 0

0.0 0

0 0

0.0 0

0 0

0.0 0

0 0

0.0 0

0 0

0.0 0

0 0

0.0 200

0

@ @ @

@ @

ste24102_ch11_456-493.indd 486ste24102_ch11_456-493.indd 486 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

Chapter Eleven Aggregate Planning and Master Scheduling 487

1. What three levels of planning involve operations managers? What kinds of decisions are made at the various levels?

2. What are the three phases of intermediate planning?

3. What is aggregate planning? What is its purpose?

4. Why is there a need for aggregate planning?

5. What are the most common decision variables for aggregate planning in a manufacturing setting? In a service setting?

6. What aggregate planning difficulty that might confront an organization offering a variety of products and/or services would not confront an organization offering one or a few similar products or services?

7. Briefly discuss the advantages and disadvantages of each of these planning strategies:

a. Maintain a level rate of output and let inventories absorb fluctuations in demand.

b. Vary the size of the workforce to correspond to predicted changes in demand requirements.

c. Maintain a constant workforce size, but vary hours worked to correspond to predicted demand requirements.

8. What are the primary advantages and limitations of informal graphic and charting techniques for aggregate planning?

9. Briefly describe the planning techniques listed below, and give an advantage and disadvantage for each:

a. Spreadsheet b. Linear programming c. Simulation

10. What are the inputs to master scheduling? What are the outputs? 11. Explain the managerial significance of aggregate planning.

DISCUSSION AND REVIEW QUESTIONS

1. What general trade-offs are involved in master scheduling in terms of the frozen portion of the schedule?

2. Who needs to interface with the master schedule and why?

3. How has technology had an impact on master scheduling?

TAKING STOCK

1. Service operations often face more difficulty in planning than their manufacturing counterparts. However, service does have certain advantages that manufacturing often does not. Explain service planning difficulty, and the advantages and disadvantages.

2. Name several behaviors related to aggregate planning or master scheduling that you believe would be unethical, and the ethical principle that would be violated for each.

CRITICAL THINKING

EXERCISES

1. Compute the total cost for each aggregate plan using these unit costs:

Regular output  �  $40

Overtime  �  $50

Subcontract  �  $60

Average Balance Inventory  �  $10

a.

PROBLEMS

Month Jan Feb Mar Apr May Jun

Forecast Output 300 320 320 340 320 320

Regular 300 300 300 300 300 300

Overtime 20 20 20 20 20 20

Subcontract 0 0 0 0 0 0

Output—Forecast

Inventory

Beginning

Ending

Average

ste24102_ch11_456-493.indd 487ste24102_ch11_456-493.indd 487 11/29/13 1:07 AM11/29/13 1:07 AM

Final PDF to printer

488 Chapter Eleven Aggregate Planning and Master Scheduling

Month 1 2 3 4 5 6

Forecast 380 400 420 440 460 480

Month 1 2 3 4 5 6

Forecast 230 200 240 240 250 240

b.

c. (Refer to part b. ) After complaints from some workers about working overtime every month dur- ing the first half of the year, the manager is now considering adding some temporary workers for the second half of the year, which would increase regular output to a steady 350 units a month, not using any overtime, and using subcontracting to make up needed output. Determine the total cost of that plan.

2. A manager would like to know the total cost of a chase strategy that matches the forecast below using a steady regular production rate of 200 units a month, a maximum of 20 units per month of overtime, and subcontracting as needed to make up any shortages. The unit costs are:

Regular production  �  $35

Overtime  �  $70

Subcontracting  �  $80

3. Determine the total cost for this plan given the following forecast:

Use steady regular output of 400 units per month, use overtime as needed for up to 40 units per month, and use subcontracting to make up any needed output to match the forecast. Unit costs are:

Regular output  �  $25

Overtime  �  $40

Subcontract  �  $60

Average Balance Inventory  �  $15

4. a. Given the following forecast and steady regular output of 550 every month, what total cost would result if overtime is limited to a maximum of 40 units a month, and subcontracting is limited to a maximum of 10 units a month? Unit costs are:

Regular output  �  $20

Overtime  �  $30

Subcontract  �  $25

Average Inventory  �  $10

Backlog  �  $18

Month Jul Aug Sep Oct Nov Dec

Forecast 320 340 360 380 400 400

Output

Regular 300 300 300 300 300 300

Overtime 20 20 20 20 30 30

Subcontract 20 30 40 40 60 70

Output—Forecast

Inventory

Beginning

Ending

Average

Month 1 2 3 4 5 6

Forecast 540 540 570 590 600 580

b. Suppose now that backlogs are not allowed. Modify your plan from part a to accommodate that new condition as economically as possible. The limits on overtime and subcontracting remain the same.

5. Manager T. C. Downs of Plum Engines, a producer of lawn mowers and leaf blowers, must develop an aggregate plan given the forecast for engine demand shown in the table. The department has a regular output capacity of 130 engines per month. Regular output has a cost of $60 per engine. The beginning inventory is zero engines. Overtime has a cost of $90 per engine. a. Develop a chase plan that matches the forecast and compute the total cost of your plan.

Regular production can be less than regular capacity.

ste24102_ch11_456-493.indd 488ste24102_ch11_456-493.indd 488 11/29/13 12:02 AM11/29/13 12:02 AM

Final PDF to printer

Chapter Eleven Aggregate Planning and Master Scheduling 489

Month Mar Apr May Jun Jul Aug Sep Total

Forecast 50 44 55 60 50 40 51 350

Month 1 2 3 4 5 6 7 Total

Forecast 250 300 250 300 280 275 270 1,925

b. Compare the costs to a level plan that uses inventory to absorb fluctuations. Inventory carrying cost is $2 per engine per month. Backlog cost is $90 per engine per month. There should not be a backlog in the last month.

MONTH

1 2 3 4 5 6 7 8 Total

Forecast 120 135 140 120 125 125 140 135 1,040

6. Manager Chris Channing of Fabric Mills, Inc., has developed the forecast shown in the table for bolts of cloth. The figures are in hundreds of bolts. The department has a regular output capacity of 275(00) bolts per month, except for the seventh month, when capacity will be 250(00) bolts. Regu- lar output has a cost of $40 per hundred bolts. Workers can be assigned to other jobs if production is less than regular. The beginning inventory is zero bolts. a. Develop a chase plan that matches the forecast and compute the total cost of your plan. Over-

time is $60 per hundred bolts. Regular production can be less than regular capacity. b. Would the total cost be less with regular production with no overtime, but using a subcontractor

to handle the excess above regular capacity at a cost of $50 per hundred bolts? Backlogs are not allowed. The inventory carrying cost is $2 per hundred bolts.

7. SummerFun, Inc., produces a variety of recreation and leisure products. The production manager has developed an aggregate forecast:

Use the following information to develop aggregate plans.

Regular production cost $10 per case

Regular production capacity 5,000 cases

Overtime production cost $16 per case

Subcontracting cost $20 per case

Holding cost $1 per case per month

Beginning inventory 0

Regular production cost $80 per unit Backorder cost $20 per unit

Overtime production cost $120 per unit Beginning inventory 0 units

Regular capacity 40 units per month

Overtime capacity 8 units per month

Subcontracting cost $140 per unit

Subcontracting capacity 12 units per month

Holding cost $10 per unit per month

Develop an aggregate plan using each of the following guidelines and compute the total cost for each plan. Hint: You will need extra output in April and August to accommodate demand in the fol- lowing months. a. Use regular production. Supplement using inventory, overtime, and subcontracting as needed.

No backlogs allowed. b. Use a level strategy. Use a combination of backlogs, subcontracting, and inventory to handle

variations in demand. There should not be a backlog in the final period.

8. Nowjuice, Inc., produces Shakewell ® fruit juice. A planner has developed an aggregate forecast for demand (in cases) for the next six months.

Month May Jun Jul Aug Sep Oct

Forecast 4,000 4,800 5,600 7,200 6,400 5,000

Use the following information to develop aggregate plans.

ste24102_ch11_456-493.indd 489ste24102_ch11_456-493.indd 489 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

490 Chapter Eleven Aggregate Planning and Master Scheduling

Develop an aggregate plan using each of the following guidelines and compute the total cost for each plan. Which plan has the lowest total cost? Note: Backlogs are not allowed.

a. Use level production. Supplement using overtime as needed. b. Use a combination of overtime (500 cases per period maximum), inventory, and subcontracting

(500 cases per period maximum) to handle variations in demand. c. Use overtime up to 750 cases per period and inventory to handle variations in demand.

9. Wormwood, Ltd., produces a variety of furniture products. The planning committee wants to pre- pare an aggregate plan for the next six months using the following information:

Month

1 2 3 4 5 6

Demand 160 150 160 180 170 140

Capacity

Regular 150 150 150 150 160 160

Overtime 10 10 0 10 10 10

Cost Per Unit

Regular time $50

Overtime 75

Subcontract 80

Inventory holding, per month 4

Subcontracting can handle a maximum of 10 units per month. Beginning inventory is zero. Develop a plan that minimizes total cost. No back orders are allowed. Regular capacity � Regular production.

10. Refer to Solved Problem 1. Prepare two additional aggregate plans. Call the one in the solved problem plan A. For plan B, hire one more worker at a cost of $200. Make up any shortfall using subcontracting at $8 per unit, with a maximum of 20 units per period (i.e., use subcontracting to reduce back orders when the forecast exceeds regular output). Note that the ending inventory in period 9 should be zero. Therefore, Total forecast  �  Total output  �  Quantity subcontracted. An additional constraint is that back orders cannot exceed 80 units in any period. For plan C, assume no workers are hired (so regular output is 200 units per period instead of 210 as in plan B). Use subcontracting as needed, but no more than 20 units per period. Compute the total cost of each plan. Which plan has the lowest cost? Assume regular monthly production � regular capacity.

11. Refer to Solved Problem 1. Suppose another option is to use part-time workers to assist during seasonal peaks. The cost per unit, including hiring and training, is $11. The output rate is 10 units per worker per period for all workers. A maximum of 10 part-time workers can be used, and the same number of part-time workers must be used in all periods that have part-time workers. The ending inventory in period 9 should be 10 units. The limit on backlogs is 20 units per period. Try to make up backlogs as soon as possible. Compute the total cost for this plan, and compare it to the cost of the plan used in the solved problem. Assume 20 full-time workers and regular monthly production � regular capacity.

12. Refer to Solved Problem 1. Prepare an aggregate plan that uses overtime ($9 per unit, maximum output 25 units per period) and inventory variation. Try to minimize backlogs. The ending inven- tory in period 9 should be zero, and the limit on backlogs is 60 units per period. Compute the total cost of your plan, and compare it to the total cost of the plan used in the solved problem. Assume 20 full-time workers.

13. Refer to Example 2. Determine if a plan to use subcontracting at a maximum rate of 50 units per period as needed with no overtime would achieve a lower total cost than the plan shown in Exam- ple 2. Again, plan for a zero inventory balance at the end of period 6. Regular production can be less than regular capacity.

14. Verify the transportation solution shown in Example 3.

15. Refer to Example 3. Suppose that an increase in warehousing costs and other costs brings inven- tory carrying costs to $2 per unit per month. All other costs and quantities remain the same. Deter- mine a revised solution to this transportation problem. Solve by modifying Table 11.6.

16. Refer to Example 3. Suppose that regular-time capacity will be reduced to 440 units in period 3 to accommodate a companywide safety inspection of equipment. What will the additional cost of the optimal plan be as compared to the one shown in Example 3? Assume all costs and quantities are the same as given in Example 3 except for the regular-time output in period 3. Solve by modifying Table 11.6.

17. Solve Problem 16 using an inventory carrying cost of $2 per unit per period.

18. Dundas Bike Components Inc. of Wheelville, Illinois, manufactures bicycle wheels in two dif- ferent sizes for the Big Bike Co. assembly plant located across town. David Dundas, the firm’s owner-manager, has just received Big Bike’s order for the next six months.

ste24102_ch11_456-493.indd 490ste24102_ch11_456-493.indd 490 11/14/13 10:15 AM11/14/13 10:15 AM

Final PDF to printer

Chapter Eleven Aggregate Planning and Master Scheduling 491

a. Under what circumstances will it be possible to develop just one aggregate plan rather than two (one for each size wheel)? Explain in two to three sentences without calculations.

b. Currently Dundas employs 28 full-time, highly skilled employees, each of whom can produce 50 wheels per month. Because skilled labor is in short supply in the Wheelville area, David would like to develop one pure level-output plan. There is no inventory of finished wheels on hand at present, but David would like to have 300 on hand at the end of April. Big Bike will tolerate back orders of up to 200 units per month. Show your level plan in tabular form. The amount produced using overtime should be the same except for the last month.

c. Calculate the total annual cost of your plan using these costs:

Nov. Dec. Jan. Feb. Mar. Apr.

20-Inch Wheels 1,000 units 900 600 700 1,100 1,100

24-Inch Wheels 500 units 500 300 500 400 600

Week Customer Orders

1 52

2 35

3 20

4 12

Period Customer Orders

1 82

2 80

3 60

4 40

5 20

Regular $5.00 Hiring $300

Overtime $7.50 Layoff $400

Part-time NA Inventory $1.00

Subcontract NA Back order $6.00

19. Prepare a master production schedule for industrial pumps in the manner of Figure 11.11 in the chapter. Use the same inputs as the example, and lot sizes of 70, but change the MPS rule from “schedule pro- duction when the projected on-hand inventory would be negative without production” to “schedule production when the projected on-hand inventory would be less than 10 without production.”

20. Update the master schedule shown in Figure 11.11 given these updated inputs: It is now the end of week 1; customer orders are 25 for week 2, 16 for week 3, 11 for week 4, 8 for week 5, and 3 for week 6. Use the MPS rule of ordering production when projected on-hand inventory would be negative without production. Prepare the master schedule for weeks 2–8.

21. Prepare a master schedule like that shown in Figure 11.11 given this information: The forecast for each week of an eight-week schedule is 50 units. The MPS rule is to schedule production if the projected on-hand inventory would be negative without it. Customer orders (committed) are as follows:

Use a production lot size of 75 units and no beginning inventory.

22. Determine the available-to-promise (ATP) quantities for each period for Problem 21.

23. Prepare a schedule like that shown in Figure 11.12 for the following situation: The forecast is 80 units for each of the first two periods and 60 units for each of the next three periods. The starting inventory is 20 units. The company uses a chase strategy for determining the production lot size, except there is an upper limit on the lot size of 70 units. Also, the desired safety stock is 10 units. Note: The ATP quantities are based on maximum allowable production.

Note: A negative projected on-hand can occur.

Committed orders are as follows:

ste24102_ch11_456-493.indd 491ste24102_ch11_456-493.indd 491 11/29/13 12:03 AM11/29/13 12:03 AM

Final PDF to printer

492 Chapter Eleven Aggregate Planning and Master Scheduling

The EGAD Bottling Company has decided to introduce a new line of premium bottled water that will include several “designer” flavors. Marketing manager Georgianna Mercer is predicting an upturn in demand based on the new offerings and the increased public aware- ness of the health benefits of drinking more water. She has prepared aggregate forecasts for the next six months, as shown in the following table (quantities are in tankloads):

Production manager Mark Mercer (no relation to Georgianna) has devel- oped the following information. (Costs are in thousands of dollars.)

Among the strategies being considered are the following:

1. Level production supplemented by up to 10 tankloads a month from overtime.

2. A combination of overtime, inventory, and subcontracting. Regular production should be the same each month.

3. Using overtime for up to 15 tankloads a month, along with inventory to handle variations. Regular production should be the same each month.

Questions

1. The objective is to choose the plan that has the lowest cost. Which plan would you recommend?

2. Presumably, information about the new line has been shared with supply chain partners. Explain what information should be shared with various partners, and why sharing that information is important.

CASE Eight Glasses a Day (EGAD)

Month May Jun Jul Aug Sept Oct Total

Forecast 50 60 70 90 80 70 420

Regular production cost $1 per tankload

Regular production capacity 60 tankloads

Overtime production cost $1.6 per tankload

Subcontracting cost $1.8 per tankload

Holding cost $2 per tankload per month

Backordering cost Backlogs are not allowed

Beginning inventory 0 tankloads

Burrows, Robert P., Lora Cecere, and Gregory P. Hackett. The Market-Driven Supply Chain: A Revolutionary Model for Sales and Operations Planning in the New On-Demand Economy. Miama, FL: The Hackett Group, 2012.

Jacobs, F. Robert, William L. Berry, D. Clay Whybark, and Thomas Vollman. Manufacturing Planning and

Control for Supply Chain Management. 6th ed. Burr Ridge, IL: McGraw-Hill/Irwin, 2011.

Wallace, Thomas F. and Robert A. Stahl. Sales and Operations Planning: The How-to Handbook, 3rd ed. T. F. Wallace and Company, 2008.

SELECTED BIBLIOGRAPHY AND FURTHER READINGS

ste24102_ch11_456-493.indd 492ste24102_ch11_456-493.indd 492 11/29/13 1:08 AM11/29/13 1:08 AM

Final PDF to printer

This page intentionally left blank

494

C H A P T E R

12

LEARNING OBJECTIVES

MRP and ERP

CHAPTER OUTLINE

12.1 Introduction, 495

12.2 An Overview of MRP, 495

12.3 MRP Inputs, 496 The Master Schedule, 496

The Bill of Materials, 497

The Inventory Records, 500

12.4 MRP Processing, 500 Updating the System, 505

12.5 MRP Outputs, 507

12.6 Other Considerations, 508 Safety Stock, 508

Lot Sizing, 509

12.7 MRP in Services, 510

12.8 Benefits and Requirements of MRP, 510 Benefits, 510

Requirements, 511

12.9 MRP II, 511 Closed-Loop MRP, 512

12.10 Capacity Requirements Planning, 513 Distribution Resource Planning for the Supply Chain, 515

12.11 ERP, 516 ERP in Services, 522

12.12 Operations Strategy, 524

Cases: Promotional Novelties, 540 DMD Enterprises, 541

Operations Tour: Stickley Furniture, 541

After completing this chapter, you should be able to:

LO12.1 Describe the conditions under which MRP is most appropriate.

LO12.2 Describe the inputs, outputs, and nature of MRP processing.

LO12.3 Explain how requirements in a master production schedule are translated into material requirements for lower-level items.

LO12.4 Discuss the benefits and requirements of MRP.

LO12.5 Describe some of the difficulties users have encountered with MRP.

LO12.6 Describe MRP II and its benefits.

LO12.7 Explain how an MRP system is useful in capacity requirements planning.

LO12.8 Describe ERP, what it provides, and its hidden costs.

ste24102_ch12_494-545.indd 494ste24102_ch12_494-545.indd 494 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

495

This chapter describes material requirements planning (MRP) and enterprise resource plan- ning (ERP). MRP is a planning and scheduling technique used for batch production of assem- bled items. The first portion of the chapter is devoted to MRP. The remainder of the chapter is devoted to ERP, which involves the use of extensive software to integrate record keeping and information sharing throughout an organization and portions of its supply chain.

12.1 INTRODUCTION A major distinction in the way inventories are managed results from the nature of demand for those items. When demand for items is derived from plans to make certain products, as it is with raw materials, parts, and assemblies used in producing a finished product, those items are said to have dependent demand . The parts and materials that go into the production of cars are examples of dependent demand because the total quantity of parts and raw materials needed during any time period depends on the number of cars that will be produced. Con- versely, demand for the finished cars is independent—a car is not a component of another item.

12.2 AN OVERVIEW OF MRP Material requirements planning (MRP) is a methodology used for planning the production of assembled products such as smart phones, automobiles, kitchen tables, and a whole host of other products that are assembled. Some items are produced repetitively while others are produced in batches. The process begins with a master schedule. The master schedule desig- nates the quantity and completion time of an assembled product, often referred to as the end item. Materials requirements planning then generates a production plan for the end item that indicates the quantities and timing of the subassemblies, component parts, and raw materials required for assembly of that end item. This sequence is depicted in Figure 12-1 .

LO12.1 Describe the condi- tions under which MRP is most appropriate.

Dependent demand  Demand for items that are subassemblies or component parts to be used in the production of finished goods.

Material requirements planning (MRP)  A methodol- ogy that translates master sched- ule requirements for end items into time-phased requirements for subassemblies, components, and raw materials.

ste24102_ch12_494-545.indd 495ste24102_ch12_494-545.indd 495 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

496 Chapter Twelve MRP and ERP

MRP is designed to answer three questions: What is needed? How much is needed? and When is it needed?

The primary inputs of MRP are a bill of materials, which tells the composition of a finished product; a master schedule, which tells how much finished product is desired and when; and an inventory records file, which tells how much inventory is on hand or on order. The planner pro- cesses this information to determine the net requirements for each period of the planning horizon.

Outputs from the process include planned-order schedules, order releases, changes, perfor- mance-control reports, planning reports, and exception reports. These topics are discussed in more detail in subsequent sections. (See Figure 12.2 .)

12.3 MRP INPUTS An MRP system has three major sources of information: a master schedule, a bill-of-materials file, and an inventory records file (see Figure 12.2 ). Let’s consider each of these inputs.

The Master Schedule The master schedule , also referred to as the master production schedule, states which end items are to be produced, when they are needed, and in what quantities. Figure 12.3 illustrates a portion of a master schedule that shows planned output for end item X for the planning horizon. The schedule indicates that 100 units of X will be needed (e.g., for shipments to cus- tomers) at the start of week 4 and that another 150 units will be needed at the start of week 8.

Master schedule  One of three primary inputs in MRP; states which end items are to be pro- duced, when these are needed, and in what quantities.

FIGURE 12.1 A material requirements plan indicates quantity and timing details needed to achieve the master schedule

Master Schedule: Quantity and completion time of an end item

Material Requirements Plan: Quantities and timing of subassemblies,

components, and raw materials required to achieve the master schedule.

FIGURE 12.2 MRP Inputs, Processing, and Outputs

LO12.2 Describe the inputs, outputs, and nature of MRP processing.

Master scheduleForecast

Orders

Design changes

Withdrawals

Receipts

MRP computer programs

Exception reports

Planning reports

Performance- control reports

Changes

Order releases

Planned-order schedules

Inventory transaction

MRP outputsMRP processingMRP inputs

Pr im

ar y

re po

rts

Secondary reports

Bill of materia ls

Inventory recor ds

ste24102_ch12_494-545.indd 496ste24102_ch12_494-545.indd 496 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 497

The quantities in a master schedule come from a number of different sources, including customer orders, forecasts, and orders from warehouses to build up seasonal inventories.

The master schedule separates the planning horizon into a series of time periods or time buckets, which are often expressed in weeks. However, the time buckets need not be of equal length. In fact, the near-term portion of a master schedule may be in weeks, but later portions may be in months or quarters. Usually, plans for those more distant time periods are more tentative than near-term requirements.

Although a master production schedule has no set time period that it must cover, most managers like to plan far enough into the future so they have some general idea of probable upcoming demands for the near term. It is important, though, that the master schedule cover the stacked or cumulative lead time necessary to produce the end items. This amounts to the sum of the lead times that sequential phases of the production or assembly process require, as illustrated in Figure 12.4 , where a total of nine weeks of lead time is needed from ordering parts and raw materials until final assembly is completed. Note that lead times include move and wait times in addition to setup and run times.

The Bill of Materials A bill of materials (BOM) contains a listing of all of the assemblies, subassemblies, parts, and raw materials that are needed to produce one unit of a finished product. Thus, each fin- ished product has its own bill of materials.

The listing in the bill of materials is hierarchical; it shows the quantity of each item needed to complete one unit of its parent item. The nature of this aspect of a bill of materi- als is clear when you consider a product structure tree , which provides a visual depiction of the subassemblies and components needed to assemble a product. Figure 12.5 shows an assembly diagram for a chair and a simple product structure tree for the chair. The end item (in this case, the chair, the finished product) is shown at the top of the tree. Just beneath it are the subassemblies, or major components, that must be put together to make up the end item. Beneath each major component are the necessary lesser components. At each stage moving down the tree are the components (parts, materials) needed to make one unit of the next higher item in the tree.

A product structure tree is useful in illustrating how the bill of materials is used to deter- mine the quantities of each of the ingredients (requirements) needed to obtain a desired num- ber of end items. Items at the lowest levels of a tree often are raw materials or purchased parts, while items at higher levels are typically assemblies or subassemblies. Product-structure trees for items at the lowest levels are the concerns of suppliers.

Let’s consider the product structure tree shown in Figure 12.6 . End item X is composed of two Bs and one C. Moreover, each B requires three Ds and one E, and each D requires four Es. Similarly, each C is made up of two Es and two Fs. These requirements are listed by level,

Cumulative lead time   The sum of the lead times that sequential phases of a process require, from ordering of parts or raw materials to completion of final assembly.

Bill of materials (BOM)   One of the three primary inputs of MRP; a listing of all of the raw materials, parts, subassem- blies, and assemblies needed to produce one unit of a product.

Product structure tree   A visual depiction of the requirements in a bill of materials, where all components are listed by levels.

FIGURE 12.3 A master schedule for end item X

Week number

Item: X 1 2 3 4 5 6 7 8

Quantity 100 150

FIGURE 12.4 The planning horizon must cover the cumulative lead time

1 2 3 4 5 6 7 8 9 10

Procurement

Fabrication

Subassembly

Assembly

Time period (weeks)

ste24102_ch12_494-545.indd 497ste24102_ch12_494-545.indd 497 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

498 Chapter Twelve MRP and ERP

Bill of Materials Level Quantity

0 Chair 1 1 Leg assembly 1 2 Legs 2 2 Cross bar 1 1 Seat 1 1 Back assemby 1 2 Side rails 2 2 Cross bar 1 2 Back supports 3

FIGURE 12.5 Assembly diagram and product structure tree for chair assembly

Chair

SeatLeg assembly

Legs (2) Cross bar

Back assembly

Side rails (2)

Cross bar

Back supports (3)

Front legs

Cross bar

Seat

Back supports

Cross bar

Side rails

Finished chair

Assembly diagram

Product structure tree

FIGURE 12.6 A product structure tree for end item X

X

2

0

1

Level

3

B (2) C

D (3) E E (2) F (2)

E (4)

E X A M P L E 1 e celx

mhhe.com/stevenson12e

Use the information presented in Figure 12.6 to do the following:

a. Determine the quantities of B, C, D, E, and F needed to assemble one X.

b. Determine the quantities of these components that will be required to assemble 10 Xs, taking into account the quantities on hand (i.e., in inventory) of various components:

Component On Hand

B 4

C 10

D 8

E 60

beginning with 0 for the end item, then 1 for the next level, and so on. The items at each level are components of the next level up and, as in a family tree, are parents of their respective components. Note that the quantities of each item in the product structure tree refer only to the amounts needed to complete the assembly at the next higher level.

ste24102_ch12_494-545.indd 498ste24102_ch12_494-545.indd 498 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 499

S O L U T I O N a. X

B: 2 � 1 � 2 B(2) C: 1 � 1 � 1 C

D: 3 � 2 � 6 D(3) E: 1 � 2 � 2 E E: 2 � 1 � 2 E(2) F: 2 � 1 � 2 F(2)

E: 4 � 6 � 24 E(4)

Thus, one X will require

B: 2 C: 1 D: 6 E: 28 (Note that E occurs in three places, with requirements of 24  �  2  �  2  �  28) F: 2

b. 10 X

B(2) C

D(3) E: 1 � 16 � 16 E E(2) F(2)

E(4) �160

� 48 �8

40

C: 1 � 10 � 10 �10

0

B: 2 � 10 �

16

20 �4

60 100

E:

D:

4 � 40

3 � 16

(No lower- level components required)

Thus, given the amounts of on-hand inventory, 10 Xs will require

B: 16 C: 0 D: 40 E: 116 F: 0

Determining total requirements is usually more complicated than Example 1 might sug- gest. For one thing, many products have considerably more components. For another, the issue of timing is essential (i.e., when must the components be ordered or made) and must be included in the analysis. Finally, for a variety of reasons, some of the components/subas- semblies may be on hand (i.e., currently in inventory). Consequently, in determining total requirements, the amounts on hand must be netted out (i.e., subtracted from the apparent requirements) to determine the true requirements as illustrated in Example 1.

ste24102_ch12_494-545.indd 499ste24102_ch12_494-545.indd 499 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

500 Chapter Twelve MRP and ERP

When an MRP system calculates requirements, the computer scans a bill of materials by level. When a component such as E in Figure  12.6 appears on more than one level, low-level coding is used so that all occurrences of that component appear on the lowest level at which the component appears. In Figure 12.6 , conceptually that would be equiva- lent to lengthening the vertical line for the two appearances of E at level 2 so that all three occurrences line up at level 3 in the tree.

Comment It is extremely important that the bill of materials accurately reflect the compo- sition of a product, particularly since errors at one level become magnified by the multi- plication process used to determine quantity requirements. As obvious as this might seem, many companies find themselves with incorrect bill-of-material records. These make it impossible to effectively determine material requirements; moreover, the task of correcting these records can be complex and time-consuming. Accurate records are a prerequisite for effective MRP.

The Inventory Records Inventory records refer to stored information on the status of each item by time period, called time buckets. This includes quantities on hand quantities ordered. It also includes other details for each item, such as supplier, lead time, and lot size policy. Changes due to stock receipts and withdrawals, canceled orders, and similar events also are recorded in this file.

Like the bill of materials, inventory records must be accurate. Erroneous information on requirements or lead times can have a detrimental impact on MRP and create turmoil when incorrect quantities are on hand or expected delivery times are not met.

12.4 MRP PROCESSING MRP processing takes the end item requirements specified by the master schedule and “explodes” them into time-phased requirements for assemblies, parts, and raw materials using the bill of materials offset by lead times. You can see the time-phasing of requirements in the assembly time chart in Figure 12.7 . For example, raw materials D, F, and I must be ordered at the start of week 2; part C at the start of week 4; and part H at the start of week 5 in order to be available for delivery as planned.

MRP processing combines the time phasing and “explosion” into a sequence of spread- sheet sections, where each section has the following format:

Low-level coding  Restructur- ing the bill of materials so that multiple occurrences of a component all coincide with the lowest level at which the component occurs.

Inventory records  One of the three primary inputs in MRP; includes information on the sta- tus of each item by time period.

LO12.3 Explain how require- ments in a master production schedule are translated into material requirements for lower-level items.

VX Corporation’s CAD/CAM software can be used not only for design specification but also to prepare parts lists. This screen shows a parts list for a bass drum pedal along with a three-dimensional view of the product subassemblies.

ste24102_ch12_494-545.indd 500ste24102_ch12_494-545.indd 500 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 501

The terms in the spreadsheet are defined as follows:

Gross requirements: The total expected demand for an item or raw material during each time period without regard to the amount on hand. For end items, these quantities are shown in the master schedule; for components, these quantities are derived from the planned-order releases of their immediate “parents.”

Scheduled receipts: Open orders (orders that have been placed and are scheduled to arrive from vendors or elsewhere in the pipeline by the beginning of a period). Note that the end- ing inventory for a period becomes the beginning inventory for the following period.

Projected on hand: The expected amount of inventory that will be on hand at the begin- ning of each time period: scheduled receipts plus available inventory from last period.

Net requirements: The actual amount needed in each time period.

Planned-order receipts: The quantity expected to be received by the beginning of the period in which it is shown. Under lot-for-lot ordering, this quantity will equal net requirements. Under lot-size ordering, this quantity may exceed net requirements.

FIGURE 12.7 Assembly time chart showing material order points needed to meet scheduled availability of the end item

1 2 3 4 5 6 7 8 9 10 11

Available for delivery

Week number Order point

Procurement of raw material F

Procurement of raw material D

Procurement of raw material I

Fabrication of part E

Procurement of part C

Procurement of part H

Final assembly and inspection

Subassembly B

Subassembly A

Fabrication of part G

Item:

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Week Number Beg. Inv.

1 2 3 4 5 6 7 8

Projected on hand Expected amount of inventory that will be on hand at the beginning of each time period.

Gross requirements Total expected demand for an item or raw material in a time period.

Scheduled receipts Open orders scheduled to arrive from vendors or elsewhere in the pipeline.

Net requirements The actual amount needed in each time period.

ste24102_ch12_494-545.indd 501ste24102_ch12_494-545.indd 501 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

502 Chapter Twelve MRP and ERP

Any excess is added to available inventory in the next time period for simplicity, although in reality, it would be available in that period.

Planned-order releases: Indicates a planned amount to order in each time period; equals planned-order receipts offset by lead time. This amount generates gross requirements at the next level in the assembly or production chain. When an order is executed, it is removed from “planned-order releases” and entered under “scheduled receipts.”

The quantities that are generated by exploding the bill of materials are gross requirements; they do not take into account any inventory that is currently on hand or due to be received.

Project inventory on-hand for current period Planned receipts

for previous period Net requirements for previous period

Scheduled receipts for current period (12–1)

The materials that a firm must actually acquire to meet the demand generated by the master schedule are the net material requirements.

The determination of the net requirements ( netting ) is the core of MRP processing. One accomplishes it by subtracting from gross requirements the sum of inventory on hand and any scheduled receipts.

Net requirements for current period Gross requirements for current

period Projected on-hand inventory for current period

� (12–2)

(Negative results for equations 12-1 or 12-2 should be rounded up to zero.) Projected on-hand inventory includes scheduled receipts, which are executed orders for components that are scheduled to be completed in-house or received from suppliers.

The timing and sizes of orders (i.e., materials ordered from suppliers or work started within the firm) are determined by planned-order releases. The timing of the receipts of these quantities is indicated by planned-order receipts. Depending on ordering policy, the planned-order releases may be multiples of a specified quantity (e.g., 50 units), or they may be equal to the quantity needed at that time. Although there are other possibilities, these two seem to be the most widely used. Example 2 illustrates the difference between these two ordering policies as well as the general concepts of time-phasing material requirements in MRP.

Development of a material requirements plan is based on the product structure tree diagram. Requirements are determined level by level, beginning with the end item (the top of the tree) and working down the tree, because the timing and quantity of each “parent” item become the basis for determining the timing and quantities of the “chil- dren” items directly below it. The children items then become the parent items for the next level, and so on.

Planned-order receipts  Quantity expected to be received by the beginning of the period in which it is shown.

Planned-order releases  Planned amount to order in each time period; planned-order receipts offset by lead time.

A firm that produces wood shutters and bookcases has received two orders for shutters: one for 100 shutters and one for 150 shutters. The 100-unit order is due for delivery at the start of week 4 of the current schedule, and the 150-unit order is due for delivery at the start of week 8. Each shutter consists of two frames and four slatted wood sections. The wood sections are made by the firm, and fabrication takes one week. The frames are ordered, and lead time is two weeks. Assembly of the shutters requires one week. There is a scheduled receipt of 70 wood sections in (i.e., at the beginning of) week 1. Determine the size and tim- ing of planned-order releases necessary to meet delivery requirements under each of these conditions:

1. Lot-for-lot ordering (i.e., planned-order release equal to net requirements).

2. Lot-size ordering with a lot size of 320 units for frames and 70 units for wood sections.

E X A M P L E 2 e celx

mhhe.com/stevenson12e

ste24102_ch12_494-545.indd 502ste24102_ch12_494-545.indd 502 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 503

S O L U T I O N

FIGURE 12.8 MRP schedule with lot-for-lot ordering

1Beg.Inv. 2 3 4 5 6 7 8

100

100

100

100

400

150

150

150

150

600

times 2

times 2

times 4

times 4

100 150

200

200

200

200

330

330

330

600

600

600

300

300

300

300

707070

70

Week number

Quantity

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Shutters:

LT = 1 week

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Frames:

LT = 2 weeks

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Wood sections: LT = 1 week

Master schedule for shutters:

a. Develop a master schedule:

Week number 1 2 3 4 5 6 7 8 Quantity 100 150

b. Develop a product structure tree:

Shutter

Frames (2) Wood sections (4)

c. Using the master schedule, determine gross requirements for shutters. Next, compute net requirements. Using lot-for-lot ordering, determine planned-order receipt quantities and the planned-order release timing to satisfy the master schedule (see Figure 12.8 ).

The master schedule calls for 100 shutters to be ready for delivery, and no shutters are projected to be on hand at the start of week 4, so the net requirements are also 100 shutters. Therefore, planned receipts for week 4 equal 100 shutters. Because shutter assembly requires

ste24102_ch12_494-545.indd 503ste24102_ch12_494-545.indd 503 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

504 Chapter Twelve MRP and ERP

one week, this means a planned-order release at the start of week 3. Using the same logic, 150 shutters must be assembled during week 7 in order to be available for delivery at the start of week 8.

The planned-order release of 100 shutters at the start of week 3 means that 200 frames (gross requirements) must be available at that time. Because none are expected to be on hand, this generates net requirements of 200 frames and necessitates planned receipts of 200 frames by the start of week 3. With a two-week lead time, this means that the firm must order 200 frames at the start of week 1. Similarly, the planned-order release of 150 shutters at week 7 generates gross and net requirements of 300 frames for week 7 as well as planned receipts for that time. The two-week lead time means the firm must order frames at the start of week 5.

The planned-order release of 100 shutters at the start of week 3 also generates gross require- ments of 400 wood sections at that time. However, because 70 wood sections are expected to be on hand, net requirements are 400  �  70  �  330. This means a planned receipt of 330 by the

FIGURE 12.9 MRP schedule with lot sizes for components

1Beg.Inv. 2 3 4 5 6 7 8

100

100

100

100

400

150

150

150

150

600

times 2

times 2

times 4

times 4

100 150

200

200

320

320

330

350

350

580

630

630

300

180

320

320

707070

70

120

20 20 20 20 50

120 120 120 140

Week number

Quantity

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Shutters:

LT = 1 week

Lot size = lot-for-lot

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Frames:

LT = 2 weeks

Lot size = multiples of 320

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Wood sections:

LT = 1 week

Lot size = multiples of 70

Master schedule for shutters:

ste24102_ch12_494-545.indd 504ste24102_ch12_494-545.indd 504 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 505

MRP provides plans for the end item and each of its subassemblies and components. Con- ceptually, this amounts to what is depicted in Figure 12.10 . Practically speaking, however, the number of components in even a relatively simple product would make the width of the result- ing spreadsheet far too wide to handle. Consequently, the plans for the individual components are stacked, as illustrated in the preceding example. Because of this, it is important to refer to the product tree in order to track relationships between components.

Example 2 is useful for describing some of the main features of MRP processing, but it understates the enormity of the task of keeping track of material requirements, especially in situations where the same subassemblies, parts, or raw materials are used in a number of dif- ferent products. Differences in timing of demands and quantities needed, revisions caused by late deliveries, high scrap rates, and canceled orders all have an impact on processing.

Consider the two product structure trees shown in Figure 12.11 . Note that both products have D as a component. Suppose we want to develop a material requirements plan for D given this additional information: There is a beginning inventory of 110 units of D on hand, and all items have lead times of one week. The master schedule calls for 80 units of A in week 4 and 50 units of C in week 5. The plan is shown in Figure 12.12 . Note that requirements for B and F are not shown because they are not related to (i.e., neither a “parent” nor a “child” of) D.

The term pegging denotes working this process in reverse, that is, identifying the par- ent items that have generated a given set of material requirements for some item such as D. Although the process may appear simple enough given the product trees and schedules shown in this chapter, when multiple products are involved, the process is more complex. Pegging enables managers to determine which product(s) will be affected if orders are late due to late deliveries, quality problems, or other problems.

The importance of the computer becomes evident when you consider that a typical firm would have not one but many end items for which it needs to develop material requirements plans, each with its own set of components. Inventories on hand and on order, schedules, order releases, and so on must all be updated as changes and rescheduling occur. Without the aid of a computer, the task would be almost hopeless; with the computer, planners can accom- plish all of these things with much less difficulty.

Updating the System A material requirements plan is not a static document. As time passes, some orders will have been completed, other orders will be nearing completion, and new orders will have been entered. In addition, there may have been changes to orders, such as changes in quantity, delays, missed deliveries of parts or raw materials, and so on. Hence, a material requirements plan is a “living” document, one that changes over time. And what we refer to as “Period 1” (i.e., the current period) is continually moving ahead; so what is now Period 2 will soon be

Pegging  The process of identi- fying the parent items that have generated a given set of material requirements for an item.

start of week 3. Since fabrication time is one week, the fabrication must start (planned-order release) at the beginning of week 2.

Similarly, the planned-order release of 150 shutters in week 7 generates gross require- ments of 600 wood sections at that point. Because no on-hand inventory of wood sections is projected, net requirements are also 600, and planned-order receipt is 600 units. Again, the one-week lead time means 600 sections are scheduled for fabrication at the start of week 6.

d. Under lot-size ordering, the only difference is the possibility that planned receipts will exceed net requirements. The excess is recorded as projected inventory in the following period. For example, in Figure 12.9 , the order size for frames is 320 units. Net require- ments for week 3 are 200; thus, there is an excess of 320  �  200  �  120 units, which become projected inventory in the next week. Similarly, net frame requirements of 180 units are 140 less than the 320 order size; again, the excess becomes projected inventory in week 8. The same thing happens with wood sections; an excess of planned receipts in weeks 3 and 7 is added to projected inventory in weeks 4 and 8. Note that the order size must be in multiples of the lot size; for week 3 it is 5 times 70, and for week 7 it is 9 times 70.

ste24102_ch12_494-545.indd 505ste24102_ch12_494-545.indd 505 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

506 Chapter Twelve MRP and ERP

Period 1. In a sense, schedules such as these have a rolling horizon, which means that plans are updated and revised so that they reflect the moving horizon over time.

The two basic systems used to update MRP records are regenerative and net change. A regenerative system is updated periodically; a net-change system is continuously updated.

A regenerative system is essentially a batch-type system, which compiles all changes (e.g., new orders, receipts) that occur within the time interval (e.g., day) and periodically updates the system. Using that information, a revised production plan is developed in the same way that the original plan was developed (e.g., exploding the bill of materials, level by level).

In a net-change system, the production plan is modified to reflect changes as they occur. If some defective purchased parts had to be returned to a vendor, the manager can enter this information into the system as soon as it becomes known. Only the changes are exploded through the system, level by level; the entire plan would not be regenerated.

The regenerative system is best suited to fairly stable systems, whereas the net-change sys- tem is best suited to systems that have frequent changes. The obvious disadvantage of a regen- erative system is the potential amount of lag between the time information becomes available and the time it can be incorporated into the material requirements plan. On the other hand, processing costs are typically less using regenerative systems; changes that occur in a given time period could ultimately cancel each other, thereby avoiding the need to modify and then remodify the plan. The disadvantages of the net-change system relate to the costs involved in

Regenerative system   Approach that updates MRP records periodically.

Net-change system  Approach that updates MRP records continuously.

FIGURE 12.10 Net requirements at each level determine gross requirements at the next

Week number

Quantity

Master schedule for shutters:

Item: Shutters

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Item: Frames

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Item: Wood sections

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

1Beg.Inv. 2 3 4 5 6 7 8

FIGURE 12.11 Two different products have D as a component

C

D(2) F

A

B D

ste24102_ch12_494-545.indd 506ste24102_ch12_494-545.indd 506 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 507

continuously updating the system and the constant state of flux in a system caused by many small changes. One way around this is to enter minor changes periodically and major changes immediately. The primary advantage of the net-change system is that management can have up-to-date information for planning and control purposes.

12.5 MRP OUTPUTS MRP systems have the ability to provide management with a fairly broad range of outputs. These are often classified as primary reports, which are the main reports, and secondary reports, which are optional outputs.

FIGURE 12.12 Material requirements plan for component D

Beg. Inv. 1 2 3

80

4

80

80

80

5 6

times 2

A LT = 1

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Beg. Inv. 1 2 3 4

50

5

50

50

50

6C LT = 1

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Beg. Inv. 1

110110

2

110

3

80

110

70

4

100

30

70

70

5 6D LT = 1

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

1 2 3 4 5

80

50

6Week number

Quantity of A

Quantity of C

Master schedule

ste24102_ch12_494-545.indd 507ste24102_ch12_494-545.indd 507 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

508 Chapter Twelve MRP and ERP

Primary Reports. Production and inventory planning and control are part of primary reports. These reports normally include the following:

1. Planned orders , a schedule indicating the amount and timing of future orders.

2. Order releases , authorizing the execution of planned orders.

3. Changes to planned orders, including revisions of due dates or order quantities and can- cellations of orders.

Secondary Reports. Performance control, planning, and exceptions belong to secondary reports.

1. Performance-control reports evaluate system operation. They aid managers by mea- suring deviations from plans, including missed deliveries and stockouts, and by provid- ing information that can be used to assess cost performance.

2. Planning reports are useful in forecasting future inventory requirements. They include pur- chase commitments and other data that can be used to assess future material requirements.

3. Exception reports call attention to major discrepancies such as late and overdue orders, excessive scrap rates, reporting errors, and requirements for nonexistent parts.

The wide range of outputs generally permits users to tailor MRP to their particular needs.

12.6 OTHER CONSIDERATIONS Aside from the main details of inputs, outputs, and processing, managers must be knowledge- able about a number of other aspects of MRP. These include the holding of safety stock, lot- sizing choices, and the possible use of MRP for unfinished products.

Safety Stock Theoretically, inventory systems with dependent demand should not require safety stock below the end item level. This is one of the main advantages of an MRP approach. Supposedly, safety stock is not needed because the manager can project precise usage quantities once the master schedule has been established because demand is not variable. Practically, however, there may be exceptions. For example, a bottleneck process or one with varying scrap rates can cause shortages in downstream operations. Furthermore, shortages may occur if orders are late or fabrication or assembly times are longer than expected. On the surface, these conditions lend themselves to the use of safety stock to maintain smooth operations; but the problem becomes more complicated when dealing with multiechelon items (i.e., multiple-level arenas such as assembled products) because a shortage of any component will prevent manufacture of the final assembly. However, a major advantage of MRP is lost by holding safety stock for all lower-level items.

MRP systems deal with these problems in several ways. The manager’s first step is to identify activities or operations that are subject to variability and to determine the extent of that variability. When lead times are variable, the concept of safety time instead of safety stock is often used. This results in scheduling orders for arrival or completion sufficiently ahead of the time they are needed in order to eliminate or substantially reduce the element of chance in waiting for those items. When quantities tend to vary, some safety stock may be called for, but the manager must carefully weigh the need and cost of carrying extra stock. Frequently, managers elect to carry safety stock for end items, which are subject to random demand, and for selected lower-level operations when safety time is not feasible.

It is important in general to make sure that lead times are accurate, particularly when the objective is to have incoming shipments of parts and materials arrive shortly before they are needed. Early arrivals increase on-hand inventory and carrying costs, but late arrivals can raise havoc, possibly delaying all following operations. Knowing this, managers may inflate lead times (i.e., use safety time) and cause early arrivals, defeating the objective of matching the arrival of orders with production schedules.

Planned orders  Schedule indi- cating the amount and timing of future orders.

Order releases  Authorization for the execution of planned orders.

Changes  Revisions of due dates or order quantities, or cancella- tions of orders.

Performance-control reports  Evaluation of system operation, including deviations from plans and cost information.

Planning reports  Data use- ful for assessing future material requirements.

Exception reports  Data on any major discrepancies encountered.

ste24102_ch12_494-545.indd 508ste24102_ch12_494-545.indd 508 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 509

If safety stock is needed, planned-order release amounts can be increased by the safety stock quantities for the designated components.

Lot Sizing Determining a lot size to order or to produce is an important issue in inventory management for both independent- and dependent-demand items. This is called lot sizing . For independent- demand items, managers often use economic order sizes and economic production quantities. For dependent-demand systems, however, a much wider variety of plans is used to determine lot sizes, mainly because no single plan has a clear advantage over the others. Some of the most popular plans for lot sizing are described in this section.

A primary goal of inventory management for both independent- and dependent-demand systems is to minimize the sum of ordering cost (or setup cost) and holding cost. With independent demand, that demand is frequently distributed uniformly throughout the planning horizon (e.g., six months, year). In some cases, demand tends to be lumpy and the planning horizon shorter (e.g., three months), so that economic lot sizes are usually much more difficult to identify. Consider the situation depicted in Figure 12.13 . Period demands vary from 1 to 80 units, and no demand size repeats over the horizon shown.

Managers can realize economies by grouping orders. This would be the case if the addi- tional cost incurred by holding the extra units until they were used led to a savings in setup or ordering cost. This determination can be very complex at times, for several reasons. First, combining period demands into a single order, particularly for middle-level or end items, has a cascading effect down through the product tree: To achieve this grouping, it becomes nec- essary to also group items at lower levels in the tree and incorporate their setup and holding costs into the decision. Second, the uneven period demand and the relatively short planning horizon require a continual recalculation and updating of lot sizes. Not surprisingly, the meth- ods used to handle lot sizing range from the complex, which attempt to include all relevant costs, to the very simple, which are easy to use and understand. In certain cases, the simple models seem to approach cost minimization although generalizations are difficult. Let’s con- sider some of these models.

Lot-for-Lot Ordering. Perhaps the simplest of all the methods is lot-for-lot ordering. The order or run size for each period is set equal to demand for that period. Example 2 demonstrated this method. Not only is the order size obvious, it also virtually eliminates holding costs for parts carried over to other periods. Hence, lot-for-lot ordering minimizes investment in inventory. Its two chief drawbacks are that it usually involves many different order sizes and thus cannot take advantage of the economies of fixed order size (e.g., stan- dard containers and other standardized procedures), and it requires a new setup for each production run. If setup costs can be significantly reduced, this method may approximate a minimum-cost lot size.

Economic Order Quantity Model. Sometimes economic order quantity (EOQ) models are used. They can lead to minimum costs if usage is fairly uniform. This is sometimes the case for lower-level items that are common to different parents and for raw materials. How- ever, the more lumpy demand is, the less appropriate such an approach is, because the mis- match in supply and demand results in leftover inventories.

Fixed-Period Ordering. This type of ordering provides coverage for some predetermined number of periods (e.g., two or three). In some instances, the span is simply arbitrary; in

FIGURE 12.13 Demand for part K

Period 1 2 3 4 5

Demand 70 50 1 80 4 Cumulative

demand 70 120 121 201 205

ste24102_ch12_494-545.indd 509ste24102_ch12_494-545.indd 509 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

510 Chapter Twelve MRP and ERP

other cases, a review of historical demand patterns may lead to a more rational designation of a fixed period length. A simple rule is: Order to cover a two-period interval. The rule can be modified when common sense suggests a better way. For example, take a look at the demands shown in Figure 12.13 . Using a two-period rule, an order size of 120 units would cover the first two periods. The next two periods would be covered by an order size of 81 units. How- ever, the demands in periods 3 and 5 are so small, it would make sense to combine them both with the 80 units and order 85 units.

Other Models. There are other models, such as the part-period model and the Wagner- Whitin model, that are used for lot sizing which are beyond the scope of this book.

12.7 MRP IN SERVICES MRP has applications in services as well as in manufacturing. These applications may involve material goods that form a part of the product–service package, or they may involve mainly service components.

An example of a product–service package is a food catering service, particularly in instances that require preparing and serving meals for large numbers of people. To estimate quantities and costs of an order, the food manager would have to determine the quantities of the ingredients for each recipe on the menu (i.e., a bill of materials), which would then be combined with the number of each meal to be prepared to obtain a material requirements plan for the event.

Similar examples occur for large-scale renovations, such as a sports stadium or a major hotel, where there are multiple repetitions of activities and related materials that must be “exploded” into their components for purposes of cost estimation and scheduling.

12.8 BENEFITS AND REQUIREMENTS OF MRP

Benefits MRP enables managers to easily determine the quantities of every component for a given order size, to know when to release orders for each component, and to be alerted when items need attention. Still other benefits include the following:

1. Low levels of in-process inventories, due to an exact matching of supply to demand.

2. The ability to keep track of material requirements.

3. The ability to evaluate capacity requirements generated by a given master schedule.

4. A means of allocating production time.

5. The ability to easily determine inventory usage by backflushing.

Backflushing is a procedure in which an end item’s bill of materials (BOM) is periodi- cally exploded to determine the quantities of the various components that were used to make the item, eliminating the need to collect detailed usage information on the produc- tion floor.

A range of people in a typical manufacturing company are important users of the infor- mation provided by an MRP system. Production planners are obvious users of MRP. Pro- duction managers, who must balance workloads across departments and make decisions about scheduling work, and plant foremen, who are responsible for issuing work orders and maintaining production schedules, also rely heavily on MRP output. Other users include customer service representatives, who must be able to supply customers with projected delivery dates; purchasing managers; and inventory managers. The benefits of MRP depend in large measure on the use of a computer to maintain up-to-date information on material requirements.

LO12.4 Discuss the benefits and requirements of MRP.

Backflushing  Exploding an end item’s BOM to determine the quantities of the components that were used to make the item.

ste24102_ch12_494-545.indd 510ste24102_ch12_494-545.indd 510 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 511

Requirements In order to implement and operate an effective MRP system, it is necessary to have

1. A computer and the necessary software programs to handle computations and maintain records.

2. Accurate and up-to-date

a. Master schedules.

b. Bills of materials.

c. Inventory records.

3. Integrity of file data.

Accuracy is absolutely essential for a successful MRP system. Inaccuracies in inventory record files or bill-of-material files can lead to unpleasant surprises, ranging from missing parts to ordering too many of some items and too few of others, and failure to stay on sched- ule, all of which contribute to inefficient use of resources, missed delivery dates, and poor customer service. Companies also need to exert scheduling discipline and have in place stan- dard procedures for maintaining and updating bills of material.

Other common problems associated with using MRP include those due to the assumption of constant lead times, products being produced differently from the bill of materials, and failure to alter a bill of materials when customizing a product.

Similarly, inaccurate forecasts can have serious consequences for producers of assembled items. If forecasts are overly optimistic, companies will experience relatively high holding costs, considering the excess inventory represented by the components and raw materials. Conversely, forecasts that are too low will result in shortages of component parts and will require long lead times to acquire the needed components and assemble the products to alleviate the shortages.

12.9 MRP II MRP was developed as a way for manufacturing companies to calculate more precisely what materials were needed to produce a product, and when and how much of those materials were needed. Manufacturing resources planning (MRP II) evolved from MRP because manu- facturers recognized additional needs. MRP II expanded the scope of materials planning to include capacity requirements planning, and to involve other functional areas of the organiza- tion such as marketing and finance in the planning process.

Material requirements planning is at the heart of the process (see Figure 12.14 ). The process begins with an aggregation of demand from all sources (e.g., firm orders, forecasts, safety stock requirements). Production, marketing, and finance personnel work toward developing a master production schedule. Although manufacturing people will have a major input in determining that schedule and a major responsibility for making it work, marketing and finance will also have important inputs and responsibilities. The rationale for having these functional areas work together is the increased likelihood of developing a plan that works and with which everyone can live. Moreover, because each of these functional areas has been involved in formulating the plan, they will have reasonably good knowledge of the plan and more reason to work toward achieving it.

In addition to the obvious manufacturing resources needed to support the plan, financing resources will be needed and must be planned for, both in amount and timing. Similarly, mar- keting resources also will be needed in varying degrees throughout the process. In order for the plan to work, the firm must have all of the necessary resources available as needed. Often, an initial plan must be revised based on an assessment of the availability of various resources. Once these have been decided, the master production schedule can be firmed up.

At this point, material requirements planning comes into play, generating material and schedule requirements. Next, management must make more detailed capacity requirements planning to determine whether these more specific capacity requirements can be met. Again, some adjustments in the master production schedule may be required.

LO12.5 Describe some of the difficulties users have encoun- tered with MRP.

Manufacturing resources planning (MRP II)  Expanded approach to production resource planning, involving other areas of a firm in the planning process and enabling capacity require- ments planning.

LO12.6 Describe MRP II and its benefits.

ste24102_ch12_494-545.indd 511ste24102_ch12_494-545.indd 511 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

512 Chapter Twelve MRP and ERP

As the schedule unfolds and actual work begins, a variety of reports help managers to monitor the process and to make any necessary adjustments to keep operations on track.

In effect, this is a continuing process, where the master production schedule is updated and revised as necessary to achieve corporate goals. The business plan that governs the entire pro- cess usually undergoes changes too, although these tend to be less frequent than the changes made at lower levels (i.e., the master production schedule).

Most MRP II systems have the capability of performing simulation, enabling managers to answer a variety of what-if questions so they can gain a better appreciation of available options and their consequences.

Closed-Loop MRP When MRP was introduced, it did not have the capability to assess the feasibility of a pro- posed plan (i.e., if sufficient capacity existed at every level to achieve the plan). Thus, there was no way of knowing before executing a proposed plan if it could be achieved, or after executing the plan if it had been achieved. Consequently, a new plan had to be developed each week. When MRP II systems began to include feedback loops, they were referred to as closed-loop MRP. Closed-loop MRP systems evaluate a proposed material plan relative to available capacity. If a proposed plan is not feasible, it must be revised. The evaluation is referred to as capacity requirements planning.

FIGURE 12.14 An overview of MRP II

No

Aggregate planning

Market demand

Master production schedule

No

No

YesAdjust production plan

Yes

Yes

Adjust MRP

Problems?

Manufacturing

Marketing

Finance

MRP

Problems?

Capacity requirements planning

Problems?

Final material requirement plans and capacity requirement plans

ste24102_ch12_494-545.indd 512ste24102_ch12_494-545.indd 512 11/21/13 2:10 PM11/21/13 2:10 PM

Final PDF to printer

Chapter Twelve MRP and ERP 513

12.10 CAPACITY REQUIREMENTS PLANNING

One of the most important features of MRP II is its ability to aid managers in capacity planning. Capacity requirements planning is the process of determining short-range capacity

requirements. The necessary inputs include planned-order releases for MRP, the current shop load, routing information, and job times. Key outputs include load reports for each work center. When variances (underloads or overloads) are projected, managers might consider remedies such as alternative routings, changing or eliminating of lot sizing or safety stock requirements, and lot splitting. Moving production forward or backward can be extremely challenging because of precedence requirements and the availability of components.

A firm usually generates a master schedule initially in terms of what is needed but not what is possible. The initial schedule may or may not be feasible given the limits of the production system and availability of materials when end items are translated into requirements for procurement, fabrication, and assembly. Consequently, it is often nec- essary to run a proposed master schedule through MRP processing in order to obtain a clearer picture of actual requirements, which can then be compared to available capacity and materials. If it turns out that the current master schedule is not feasible, management may make a decision to increase capacity (e.g., through overtime or subcontracting) or to revise the master schedule. In the latter case, this may entail several revisions, each of which is run through the system until a feasible plan is obtained. At that point, the master schedule is frozen, at least for the near term, thus establishing a firm schedule from which to plan requirements.

Stability in short-term production plans is very important; without it, changes in order quantity and/or timing can render material requirements plans almost useless. The term sys- tem nervousness describes the way a system might react to changes. The reaction can some- times be greater than the original change. For example, a small change near the top of a product tree can reverberate throughout much of the lower parts of the tree, causing major changes to order quantities and production schedules of many components. That, in turn, might cause queues to form at various portions of the system, leading to late orders, increased work in process, and added carrying costs.

To minimize such problems, many firms establish a series of time intervals, called time fences , during which changes can be made to orders. For example, a firm might specify time fences of 4, 8, and 12 weeks, with the nearest fence being the most restrictive and the farthest fence being the least restrictive. Beyond 12 weeks, changes are expected; from 8 to 12 weeks, substitutions of one end item for another may be permitted as long as the components are available and the production plan is not compromised; from 4 to 8 weeks, the plan is fixed, but small changes may be allowed; and the plan is frozen out to the four- week fence.

Some companies use two fences: One is a near-term demand fence, and the other is a long-term planning fence. For example, the demand fence might be 4 weeks from the pres- ent time while the planning fence might be 10 weeks away. In the near term, customer orders receive precedence over the forecast. The time beyond the planning fence is available for inserting new orders into the master schedule. Between the demand fence and the planning fence, management must make trade-offs when changes are introduced unless excess capacity is expected to be available.

In establishing time fences, a manager must weigh the benefits of stability in the produc- tion plan against the possible negative impact on the competitive advantage of being able to quickly respond to new orders.

Figure 12.15 presents an overview of the capacity planning process. The process begins with a proposed or tentative master production schedule that must be tested for feasibility and possibly adjusted before it becomes permanent. The proposed schedule is processed

LO12.7 Explain how an MRP system is useful in capacity requirements planning.

Capacity requirements planning  The process of deter- mining short-range capacity requirements.

Time fences  Series of time intervals during which order changes are allowed or restricted; the nearest fence is most restrictive to change, the farthest is least restrictive.

ste24102_ch12_494-545.indd 513ste24102_ch12_494-545.indd 513 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

514 Chapter Twelve MRP and ERP

using MRP to ascertain the material requirements the schedule would generate. These are then translated into resource (i.e., capacity) requirements, often in the form of a series of load reports for each department or work center, which compares known and expected future capacity requirements with projected capacity availability. Figure 12.16 illustrates the nature of a load report. It shows expected resource requirements (i.e., usage) for jobs currently being worked on, planned orders, and expected orders for the planning horizon. Given this sort of information, the manager can more easily determine whether capacity is sufficient to satisfy these requirements. If there is enough capacity, he or she can freeze the portion of the master production schedule that generates these requirements. In the load

Load reports  Department or work center reports that com- pare known and expected future capacity requirements with pro- jected capacity availability.

FIGURE 12.15 Using MRP to assist in planning capacity requirements Source: Stephen Love, Inventory Control (New York: McGraw-Hill). Reprinted by permission.

No

Yes

Is shop capacity

adequate?

Develop a tentative master production schedule

Firm up a portion of the MPS

Use MRP to simulate material requirements

Convert material requirements to resource requirements (load report)

Can capacity be

changed to meet requirements?

Revise tentative master production schedule

Change capacity

Yes

No

FIGURE 12.16 A hypothetical department load profile

1 2 3 4 5 6 7 8 9 10 11 12 13

Time period

Lo ad

( h

o u

rs p

er p

er io

d ) Capacity

Now in production

Planned- order releases

Expected orders

0

ste24102_ch12_494-545.indd 514ste24102_ch12_494-545.indd 514 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 515

profile illustrated in Figure 12.16 , planned-order releases in time period 4 will cause an overload. However, it appears possible to accommodate demand by slightly shifting some orders to adjacent periods. Similarly, an overload appears likely in period 11, but that too can be handled by shifting some jobs to adjacent time periods. In cases where capacity is insufficient, a manager may be able to increase capacity (by scheduling overtime, transfer- ring personnel from other areas, or subcontracting some of the work) if this is possible and economical, or else revise the master production schedule and repeat the process until an acceptable production schedule is obtained.

If the master production schedule must be revised, this generally means that the man- ager must assign priorities to orders, if some orders will be finished later than originally planned.

One note of caution is in order concerning capacity load reports. Often, the load reports are only approximations, and they may not give a true picture because the loading does not take into account scheduling and queuing delays. Consequently, it is possible to expe- rience system backups even though a load report implies sufficient capacity to handle projected loads.

An important aspect of capacity requirements planning is the conversion of quantity requirements into labor and machine requirements. One accomplishes this by multiplying each period’s quantity requirements by standard labor and/or machine requirements per unit. For instance, if 100 units of product A are scheduled in the fabrication department, and each unit has a labor standard time of 2 hours and a machine standard time of 1.5 hours, then 100 units of A convert into these capacity requirements:

Labor: 100 units 2 hours/unit 200 labor hours

Machine: 100 units 1.5 hours/unit 150 machine hours

� �

� �

One can then compare these capacity requirements with available department capacity to determine the extent to which this product utilizes capacity. For example, if the department has 200 labor hours and 200 machine hours available, labor utilization will be 100 percent because all of the labor capacity will be required by this product. However, machine capacity will be underutilized.

Required

Available 100

150 hours

200 hours 100 75 percent� � � �

Underutilization may mean that unused capacity can be used for other jobs; overutilization indicates that available capacity is insufficient to handle requirements. To compensate, pro- duction may have to be rescheduled or overtime may be needed.

Distribution Resource Planning for the Supply Chain Distribution resource planning (DRP) , also referred to as distribution requirements plan- ning, is a method used for planning orders in a supply chain. It extends MRP concepts, enabling a planner to compute time-phased inventory requirements for a supply chain. The goal is to achieve a balance of supply and demand throughout the supply chain.

It begins with a forecast of demand plus actual orders for future periods at the distribution end (e.g., retail) of a supply chain. Other information needed includes the quantity and tim- ing of scheduled receipts at various points in the supply chain as well as on-hand inventories, and any safety stock requirements. Some versions of DRP also include projections for labor, material handling facilities, and storage space that will be needed.

In a procedure similar to MRP, the planned-order release quantities at each level in the supply chain become the gross requirements one level back, as illustrated in Figure 12.17 . In effect, the process pulls inventory shipment through the supply chain based on demand.

Distribution resource plan- ning (DRP)  A method used for planning orders in a supply chain.

ste24102_ch12_494-545.indd 515ste24102_ch12_494-545.indd 515 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

516 Chapter Twelve MRP and ERP

12.11 ERP Business organizations are complex systems in which various functions such as purchasing, production, distribution, sales, human resources, finance, and accounting must work together to achieve the goals of the organization. However, in the functional structure used by many business organizations, information flows freely within each function, but not so between functions. That makes information sharing among functional areas burdensome.

Enterprise resource planning (ERP) is a computerized system designed to con- nect all parts of a business organization as well as key portions of its supply chain to a single database for the purpose of information sharing. Some of the key connections are depicted in Figure 12.18 . SAP and PeopleSoft are major vendors, although there are many others.

ERP software provides a system to capture and make data available in real time to deci- sion makers and other users throughout an organization. It also provides a set of tools for planning and monitoring various business processes to achieve the goals of the organiza- tion. ERP systems are composed of a collection of integrated modules. There are many modules to choose from, and different software vendors offer different but similar lists of modules. Some are industry specific, and others are general purpose. The modules relate to the functional areas of business organizations. For example, there are modules for account- ing and finance, HR, product planning, purchasing, inventory management, distribution, order tracking, finance, accounting, and marketing. Organizations can select the modules that best serve their needs and budgets. Table 12.1 provides an overview of some widely used modules.

An important feature of the modules is that data entered in one module is automatically routed to other modules, so all data is immediately updated and available to all functional areas.

It should be noted that implementations are costly and time consuming, often lasting many years, and require extensive employee training throughout the organization.

The following reading provides additional insight into ERP.

LO12.8 Describe ERP, what it provides, and its hidden costs.

Enterprise resource planning (ERP)  Integration of financial, manufacturing, and human resources in a single database.

FIGURE 12.17 Supply chain order planning

Shipments

Supplier Supplier Factory Retail

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

ste24102_ch12_494-545.indd 516ste24102_ch12_494-545.indd 516 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 517

FIGURE 12.18 Key Connections to the ERP System

Inventory

Purchasing

Supply Chain Management

Production or

Service

Sales and Marketing

Financials

ERP

Human Resource

Management

Customer Relationship Management

Module Brief Description

Accounting/Finance A central component of most ERP systems. It provides a range of financial reports, including general ledger, accounts payable, accounts receivable, payroll, income statements, and balance sheets.

Marketing Supports lead generation, target marketing, direct mail, and sales.

Human Resources Maintains a complete database of employee information such as date of hire, salary, contact information, performance evaluations, and other pertinent information.

Purchasing Facilitates vendor selection, price negotiation, making purchasing decisions, and bill payment.

Production Planning Integrates information on forecasts, orders, production capacity, on-hand inventory quantities, bills of material, work in process, schedules, and production lead times.

Inventory Management Identifies inventory requirements, inventory availability, replenishment rules, and inventory tracking.

Distribution Contains information on third-party shippers, shipping and delivery schedules, delivery tracking.

Sales Information on orders, invoices, order tracking, and shipping.

Supply Chain Management Facilitates supplier and customer management, supply chain visibility, and event management.

Customer Relationship Management Contact information, buying behavior, shipping preferences, contracts, payment terms, and credit history.

TABLE 12.1 An overview of some ERP software modules

ste24102_ch12_494-545.indd 517ste24102_ch12_494-545.indd 517 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

READING The ABCs of ERP

518 Chapter Twelve MRP and ERP

shipping it and billing for it. With ERP, when a customer service representative takes an order from a customer, he or she has all the information necessary to complete the order (the customer’s credit rat- ing and order history, the company’s inventory levels and the shipping dock’s trucking schedule). Everyone else in the company sees the same computer screen and has access to the single database that holds the customer’s new order. When one department finishes with the order it is automatically routed via the ERP system to the next department. To find out where the order is at any point, one need only log into the ERP system and track it down. With luck, the order process moves like a bolt of light- ning through the organization, and customers get their orders faster and with fewer mistakes than before. ERP can apply that same magic to the other major business processes, such as employee benefits or financial reporting.

That, at least, is the dream of ERP. The reality is much harsher. Let’s go back to those inboxes for a minute. That process may

not have been efficient, but it was simple. Finance did its job, the warehouse did its job, and if anything went wrong outside of the department’s walls, it was somebody else’s problem. Not anymore. With ERP, the customer service representatives are no longer just typ- ists entering someone’s name into a computer and hitting the return key. The ERP screen makes them business people. It flickers with the customer’s credit rating from the finance department and the product inventory levels from the warehouse. Will the customer pay on time? Will we be able to ship the order on time? These are decisions that customer service representatives have never had to make before and which affect the customer and every other department in the com- pany. But it’s not just the customer service representatives who have to wake up. People in the warehouse who used to keep inventory in their heads or on scraps of paper now need to put that information online. If they don’t, customer service will see low inventory levels on their screens and tell customers that their requested item is not in stock. Accountability, responsibility and communication have never been tested like this before.

How Long Will an ERP Project Take? Companies that install ERP do not have an easy time of it. Don’t be fooled when ERP vendors tell you about a three or six month average implementation time. Those short (that’s right, six months is short) implementations all have a catch of one kind or another: the company was small, or the implementation was limited to a small area of the company, or the company only used the financial pieces of the ERP system (in which case the ERP system is nothing more than a very expensive accounting system). To do ERP right, the ways you do busi- ness will need to change and the ways people do their jobs will need to change too. And that kind of change doesn’t come without pain. Unless, of course, your ways of doing business are working extremely well (orders all shipped on time, productivity higher than all your com- petitors, customers completely satisfied), in which case there is no reason to even consider ERP.

Compiled from Reports by Christopher Koch , Derek Slater , and E. Baatz

What is ERP?

How can ERP improve a company’s business performance?

How long will an ERP project take?

What will ERP fix in my business?

Will ERP fit the way I do business?

What does ERP really cost?

When will I get payback from ERP—and how much will it be?

The hidden costs of ERP?

How do you configure ERP software?

How do companies organize their ERP projects?

How does ERP fit with electronic commerce?

What Is ERP? Enterprise resource planning software, or ERP, doesn’t live up to its acronym. Forget about planning—it doesn’t do that—and forget about resource, a throwaway term. But remember the enterprise part. This is ERP’s true ambition. It attempts to integrate all departments and func- tions across a company onto a single computer system that can serve all those different departments’ particular needs.

That is a tall order, building a single software program that serves the needs of people in finance as well as it does the people in human resources and in the warehouse. Each of those departments typically has its own computer system, each optimized for the particular ways that the department does its work. But ERP combines them all together into a single, integrated software program that runs off a single data- base so that the various departments can more easily share information and communicate with each other.

That integrated approach can have a tremendous payback if com- panies install the software correctly. Take a customer order, for example. Typically, when a customer places an order, that order begins a mostly paper-based journey from in-basket to in-basket around the company, often being keyed and rekeyed into different departments’ computer sys- tems along the way. All that lounging around in in-baskets causes delays and lost orders, and all the keying into different computer systems invites errors. Meanwhile, no one in the company truly knows what the status of the order is at any given point because there is no way for the finance department, for example, to get into the warehouse’s computer system to see whether the item has been shipped. “You’ll have to call the ware- house,” is the familiar refrain heard by frustrated customers.

How Can ERP Improve a Company’s Business Performance? ERP automates the tasks involved in performing a business process— such as order fulfillment, which involves taking an order from a customer,

(continued )

ste24102_ch12_494-545.indd 518ste24102_ch12_494-545.indd 518 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 519

difficult, because the customizations will need to be torn apart and rewritten to fit with the new version.

Needless to say, the move to ERP is a project of breathtaking scope, and the price tags on the front end are enough to make the most placid CFO a little twitchy. In addition to budgeting for software costs, finan- cial executives should plan to write checks to cover consulting, process rework, integration testing and a long laundry list of other expenses before the benefits of ERP start to manifest themselves. Underestimat- ing the price of teaching users their new job processes can lead to a rude shock down the line. So can failure to consider data warehouse integration requirements and the cost of extra software to duplicate the old report formats. A few oversights in the budgeting and planning stage can send ERP costs spiraling out of control faster than oversights in planning almost any other information system undertaking.

What Does ERP Really Cost? Meta Group recently did a study looking at the Total Cost of Owner- ship (TCO) of ERP, including hardware, software, professional services, and internal staff costs. The TCO numbers include getting the software installed and the two years afterward, which is when the real costs of maintaining, upgrading and optimizing the system for your business are felt. Among the 63 companies surveyed—including small, medium and large companies in a range of industries—the average TCO was $15 million (the highest was $300 million and lowest was $400,000). While it’s hard to draw a solid number from that kind of a range of companies and ERP efforts, Meta came up with one statistic that proves that ERP is expensive no matter what kind of company is using it. The TCO for a “heads-down” user over that period was a staggering $53,320.

When Will I Get Payback from ERP—and How Much Will It Be? Don’t expect to revolutionize your business with ERP. It is a navel gazing exercise that focuses on optimizing the way things are done internally rather than with customers, suppliers or partners. Yet the navel gazing has a pretty good payback if you’re willing to wait for it—a Meta Group study of 63 companies found that it took eight months after the new system was in (31 months total) to see any benefits. But the median annual savings from the new ERP system was $1.6 million per year.

The Hidden Costs of ERP Although different companies will find different land mines in the bud- geting process, those who have implemented ERP packages agree that certain costs are more commonly overlooked or underestimated than others. Armed with insights from across the business, ERP pros vote the following areas as most likely to result in budget overrun.

1. Training. Training is the near-unanimous choice of experienced ERP implementers as the most elusive budget item. It’s not so much that this cost is completely overlooked as it is consistently underesti- mated. Training expenses are high because workers almost invari- ably have to learn a new set of processes, not just a new software interface.

The important thing is not to focus on how long it will take—real transformational ERP efforts usually run between one to three years, on average—but rather to understand why you need it and how you will use it to improve your business.

What Will ERP Fix in My Business? There are three major reasons why companies undertake ERP:

To integrate financial data —As the CEO tries to understand the company’s overall performance, he or she may find many different versions of the truth. Finance has its own set of revenue numbers, sales has another version, and the different business units may each have their own versions of how much they contributed to revenues. ERP creates a single version of the truth that cannot be questioned because everyone is using the same system.

To standardize manufacturing processes —Manufacturing com- panies—especially those with an appetite for mergers and acquisi- tions—often find that multiple business units across the company make the same widget using different methods and computer sys- tems. Standardizing those processes and using a single, integrated computer system can save time, increase productivity and reduce headcount.

To standardize HR information —Especially in companies with multiple business units, HR may not have a unified, simple method for tracking employee time and communicating with them about benefits and services. ERP can fix that.

In the race to fix these problems, companies often lose sight of the fact that ERP packages are nothing more than generic representations of the ways a typical company does business. While most packages are exhaustively comprehensive, each industry has its quirks that make it unique. Most ERP systems were designed to be used by discreet manu- facturing companies (who make physical things that can be counted), which immediately left all the process manufacturers (oil, chemical and utility companies that measure their products by flow rather than indi- vidual units) out in the cold. Each of these industries has struggled with the different ERP vendors to modify core ERP programs to their needs.

Will ERP Fit the Ways I Do Business? It’s critical for companies to figure out if their ways of doing business will fit within a standard ERP package before the checks are signed and the implementation begins. The most common reason that companies walk away from multimillion-dollar ERP projects is that they discover that the software does not support one of their important business pro- cesses. At that point there are two things they can do: They can change the business process to accommodate the software, which will mean deep changes in long-established ways of doing business (that often provide competitive advantage) and shake up important peoples’ roles and responsibilities (something that few companies have the stomach for). Or they can modify the software to fit the process, which will slow down the project, introduce dangerous bugs into the system and make upgrading the software to the ERP vendor’s next release excruciatingly

(continued )

ste24102_ch12_494-545.indd 519ste24102_ch12_494-545.indd 519 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

520 Chapter Twelve MRP and ERP

bonus offers than you can afford—or that your HR policies permit. Huddle with HR early on to develop a retention bonus program and to create new salary strata for ERP veterans. If you let them go, you’ll wind up hiring them—or someone like them—back as consultants for twice what you paid them in salaries.

7. Implementation teams can never stop. Most companies intend to treat their ERP implementations as they would any other soft- ware project. Once the software is installed, they figure, the team will be scuttled and everyone will go back to his or her day job. But after ERP, you can’t go home again. You’re too valuable. Because they have worked intimately with ERP, they know more about the sales process than the salespeople do and more about the manu- facturing process than the manufacturing people do. Companies can’t afford to send their project people back into the business because there’s so much to do after the ERP software is installed. Just writing reports to pull information out of the new ERP sys- tem will keep the project team busy for a year at least. And it is in analysis—and, one hopes, insight—that companies make their money back on an ERP implementation. Unfortunately, few IS departments plan for the frenzy of post-ERP installation activ- ity, and fewer still build it into their budgets when they start their ERP projects. Many are forced to beg for more money and staff immediately after the go-live date, long before the ERP project has demonstrated any benefit.

8. Waiting for ROI. One of the most misleading legacies of tradi- tional software project management is that the company expects to gain value from the application as soon as it is installed; the project team expects a break, and maybe a pat on the back. Nei- ther expectation applies to ERP. Most don’t reveal their value until after companies have had them running for some time and can concentrate on making improvements in the business processes that are affected by the system. And the project team is not going to be rewarded until their efforts pay off.

9. Post-ERP depression. ERP systems often wreak havoc in the companies that install them. In a recent Deloitte Consulting survey of 64 Fortune 500 companies, one in four admitted that they suf- fered a drop in performance when their ERP systems went live. The true percentage is undoubtedly much higher. The most com- mon reason for the performance problems is that everything looks and works differently from the way it did before. When people can’t do their jobs in the familiar way and haven’t yet mastered the new way, they panic, and the business goes into spasms.

How Do You Configure ERP Software? Even if a company installs ERP software for the so-called right reasons and everyone can agree on the optimal definition of a customer, the inherent difficulties of implementing something as complex as ERP is like, well, teaching an elephant to do the hootchy-kootchy. The pack- ages are built from database tables, thousands of them, that IS pro- grammers and end users must set to match their business processes;

2. Integration and testing. Testing the links between ERP packages and other corporate software links that have to be built on a case- by-case basis is another often underestimated cost. A typical man- ufacturing company may have add-on applications for logistics, tax, production planning and bar coding. If this laundry list also includes customization of the core ERP package, expect the cost of integrating, testing and maintaining the system to skyrocket.

As with training, testing ERP integration has to be done from a process-oriented perspective. Instead of plugging in dummy data and moving it from one application to the next, veterans recom- mend running a real purchase order through the system, from order entry through shipping and receipt of payment—the whole order-to-cash banana—preferably with the participation of the employees who will eventually do those jobs.

3. Data conversion. It costs money to move corporate information, such as customer and supplier records, product design data and the like, from old systems to new ERP homes. Although few CIOs will admit it, most data in most legacy systems is of little use. Companies often deny their data is dirty until they actually have to move it to the new client/server setups that popular ERP packages require. Consequently, those companies are more likely to under- estimate the cost of the move. But even clean data may demand some overhaul to match process modifications necessitated—or inspired—by the ERP implementation.

4. Data analysis. Often, the data from the ERP system must be combined with data from external systems for analysis purposes. Users with heavy analysis needs should include the cost of a data warehouse in the ERP budget—and they should expect to do quite a bit of work to make it run smoothly. Users are in a pickle here: Refreshing all the ERP data in a big corporate data warehouse daily is difficult, and ERP systems do a poor job of indicating which information has changed from day to day, making selective ware- house updates tough. One expensive solution is custom program- ming. The upshot is that the wise will check all their data analysis needs before signing off on the budget.

5. Consultants ad infinitum. When users fail to plan for disengage- ment, consulting fees run wild. To avoid this, companies should identify objectives for which [their] consulting partners must aim when training internal staff. Include metrics in the consultants’ contract; for example, a specific number of the user company’s staff should be able to pass a project-management leadership test—similar to what Big Five consultants have to pass to lead an ERP engagement.

6. Replacing your best and brightest. ERP success depends on staffing the project with the best and brightest from the business and IS. The software is too complex and the business changes too dramatic to trust the project to just anyone. The bad news is, a company must be prepared to replace many of those people when the project is over. Though the ERP market is not as hot as it once was, consulting firms and other companies that have lost their best people will be hounding yours with higher salaries and

(continued )

ste24102_ch12_494-545.indd 520ste24102_ch12_494-545.indd 520 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 521

the core business of the corporation will not be disrupted if something goes wrong. Once the project team gets the system up and running and works out all the bugs, the team begins selling other units on ERP, using the first implementation as a kind of in-house customer refer- ence. Plan for this strategy to take a long time.

Slam-dunk —ERP dictates the process design in this method, where the focus is on just a few key processes, such as those con- tained in an ERP system’s financials module. The slam-dunk is gener- ally for smaller companies expecting to grow into ERP.

The goal here is to get ERP up and running quickly and to ditch the fancy reengineering in favor of the ERP system’s “canned” processes. Few companies that have approached ERP this way can claim much payback from the new system. Most use it as an infrastructure to support more diligent installation efforts down the road. Yet many discover that a slammed-in ERP system is little better than a legacy system, because it doesn’t force employees to change any of their old habits. In fact, doing the hard work of process reengineering after the system is in can be more challenging than if there had been no system at all, because at that point few people in the company will have felt much benefit.

How Does ERP Fit with Electronic Commerce? After all of that work inventing, perfecting and selling ERP to the world, the major ERP vendors are having a hard time shifting gears from making the applications that streamline business practices inside a company to those that face outward to the rest of the world. These days, the hottest areas for outward-looking (that is, Internet) post-ERP work are electronic commerce, planning and managing your supply chain, and tracking and serving customers. Most ERP vendors have been slow to develop offerings for these areas, and they face stiff competition from niche vendors. ERP vendors have the advan- tage of a huge installed base of customers and a virtual stranglehold on the “back office” functions—such as order fulfillment. Recently ERP vendors have begun to shrink their ambitions and focus on being the back-office engine that powers electronic commerce, rather than trying to own all the software niches that are necessary for a good electronic commerce Web site. Indeed, as the niche vendors make their software easier to hook into electronic commerce Web sites, and as middleware vendors make it easier for IS departments to hook together applications from different vendors, many people wonder how much longer ERP vendors can claim to be the primary platform for the Fortune 500.

Questions

1. What is ERP? 2. What are the three main reasons firms adopt ERP? 3. What are some hidden costs of ERP? 4. How does ERP fit with e-commerce and supply chain management?

Source: Christopher Koch, “ABC: An Introduction to ERP,” Cio.com , Copyright © 2008 CXO Media. Used with permission.

each table has a decision “switch” that leads the software down one decision path or another. By presenting only one way for the company to do each task—say, run the payroll or close the books—a company’s individual operating units and far-flung divisions are integrated under one system. But figuring out precisely how to set all the switches in the tables requires a deep understanding of the existing processes being used to operate the business. As the table settings are decided, these business processes are reengineered, ERP’s way. Most ERP systems are not shipped as a shell system in which customers must determine at the minutia level how all the functional procedures should be set, mak- ing thousands of decisions that affect how their system behaves in line with their own business activities. Most ERP systems are preconfigured, allowing just hundreds— rather than thousands—of procedural set- tings to be made by the customer.

How Do Companies Organize Their ERP Projects? Based on our observations, there are three commonly used ways of installing ERP.

The big bang —In this, the most ambitious and difficult of approaches to ERP implementation, companies cast off all their legacy systems at once and implement a single ERP system across the entire company.

Though this method dominated early ERP implementations, few companies dare to attempt it anymore because it calls for the entire company to mobilize and change at once. Most of the ERP imple- mentation horror stories from the late ’90s warn us about companies that used this strategy. Getting everyone to cooperate and accept a new software system at the same time is a tremendous effort, largely because the new system will not have any advocates. No one within the company has any experience using it, so no one is sure whether it will work. Also, ERP inevitably involves compromises. Many depart- ments have computer systems that have been honed to match the ways they work. In most cases, ERP offers neither the range of func- tionality, nor the comfort of familiarity that a custom legacy system can offer. In many cases, the speed of the new system may suffer because it is serving the entire company rather than a single depart- ment. ERP implementation requires a direct mandate from the CEO.

Franchising strategy —This approach suits large or diverse compa- nies that do not share many common processes across business units. Independent ERP systems are installed in each unit, while linking common processes, such as financial bookkeeping, across the enterprise.

This has emerged as the most common way of implementing ERP. In most cases, the business units each have their own “instances” of ERP—that is, a separate system and database. The systems link together only to share the information necessary for the corporation to get a performance big picture across all the business units (business unit revenues, for example), or for processes that don’t vary much from business unit to business unit (perhaps HR benefits). Usually, these implementations begin with a demonstration or “pilot” instal- lation in a particularly open-minded and patient business unit where

(concluded)

ste24102_ch12_494-545.indd 521ste24102_ch12_494-545.indd 521 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

READING The Top 10 ERP Mistakes

522 Chapter Twelve MRP and ERP

ERP in Services Although ERP was initially developed for manufacturing, it now has a long list of service applications. These include professional services, postal services, retail, banking, health care, higher education, engineering and construction services, logistics services, and real estate management.

In a manufacturing environment, ERP systems generally encompass the major functions such as production planning and scheduling, inventory management, product costing, and distribution. In a service environment, the major functions can differ from one service orga- nization to another. For example, many universities use ERP systems; they typically are used to integrate and access student information, course prerequisites, course schedules, room schedules, human resources, accounting, and financial information. Hospitals’ ERP systems include patient records, medication data, treatment plans, and scheduling information (e.g., rooms, equipment, surgery) as well as human resources information.

ERP is now about enterprise applications integration, an issue that generally arises with any major technology acquisition. The following reading underscores this point.

promise their board of directors that with the ERP project, they are going to see sav- ings in 24 to 36 months of such-and-such amount. They want to see the return on investment now.

7. Starting too late to address all things data (architecture, stan- dards, management, cleansing, and so on). These systems are only as good as the fundamental data that enters them. And that’s where a common problem erupts. Far too often, research indicates, companies think about the quality and accuracy of their data too late in the project. The consistency and accuracy of data is [ sic ] critical.

6. Failing to staff the team with “A” players from business and technical sides of the organization, including program man- agement. This can be a major challenge. You need top-notch players for these projects—not just technical stars but stellar per- formers from the business side as well. Indeed, if you have to trade off in terms of quality in one area, never skimp on business talent. You can perhaps trade off on technical expertise because the con- sultant you retain can bring in skilled technicians.

And the “A” players should encompass program managers to the most junior members of the team.

5. Starting without an effective and dedicated senior governance council, including a single executive sponsor. Any major ERP project overhauls a lot of business processes, roles, responsibili- ties, standards, and data definitions—and these are changes that cannot be pursued from the bottom up. An effective governing council—a steering group—is essential, as is a single executive sponsor, dedicated and effective, to chair it. The project will trigger difficult, sometimes nasty, issues and a senior executive who is accountable can make those decisions and see that the steering group understands and accepts them.

Clive Weightman Although faulty technology often is blamed for problems, it is frequently other shortcomings that create performance-related problems—such as the people employing the ERP application don’t fully understand what it is or how it works.

Execution of a successful ERP project provides the backbone for a company’s internal and external operations—from integrating back- office financials with business performance data to building a launch platform for an extended enterprise and collaborative commerce. This foundation can serve as the competitive weapon of the future.

Top 10 Mistakes

10. Believing the journey is complete at “go live.” Treat the day your ERP project goes live as the start of the next phase of your journey, not the finish because an ERP implementation represents much more than simply a project . . . So don’t disband the team a month after the project goes live.

9. Not planning for—and minimizing—the interim performance dip after start up. Research shows that even the projects that have gone the smoothest in the execution stage suffer a dip in per- formance after the new system launches. Transactional efficiency, the pace of taking sales orders may slow down, or the speed of pushing products into the warehouse may decline a bit. Recognize that performance is going to suffer some at the outset, but with excellent execution, this effect can be very slim and very short.

8. Failing to balance the needs and power of integration with seeking quick business hits. Today, every chief executive officer must deliver results now, not in 15 months from now. Given the challenges of a full ERP implementation, it’s difficult for them to

(continued )

ste24102_ch12_494-545.indd 522ste24102_ch12_494-545.indd 522 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 523

local) and future production schedules. The agent can freeze and commit from this schedule to the customer’s immediate needs, among other things.

1. Embarking on the journey without a solid, approved busi- ness case, including mechanisms to update the business case continuously and to ensure the savings are baked into operational budgets. Since an ERP project is going to take a minimum of 12 months and as much as 36 months to employ, and often costs between $5 million and $50 million out-of-pocket costs, stamina is essential. So you must be absolutely certain why you’re embarking on this journey; that is, have a solid busi- ness case.

At the same time, if a solid business case hasn’t been made for the project, you won’t get the commitment from the entire busi- ness team to make the journey successful. Many times when a company pursues an ERP implementation, it isn’t simply to cut technology costs, because total technical costs may well increase with the application. Most of the time, the project is undertaken for broader business reasons, so if those reasons aren’t clearly expressed, fully understood, and approved in both qualitative and quantitative terms, members of the senior executive team won’t give their full support.

While this is far less of an issue than it was five years ago, a number of major companies still complete the business case for an ERP project, submit a capital appropriation request, eventually get it approved, only to park the business case on the shelf to gather dust while the project proceeds.

A business case should be a living, breathing document of how to drive out both the original and updated business benefits from the ERP journey for, say, the next 20 years. It must outline how to track the benefits the application will produce, and it must be used for the CEO to bake into the annual operating budgets the cost-reductions and revenue increases that each vice president has committed to. It must make senior and middle executives accountable for the goals so that the anticipated bottom-line ben- efits are realized. This type of discipline still is relatively rare, in part because many managers think, “Hey, I’m not going to be here to see the end of this.”

But, for an ERP project to succeed, it is critical that this busi- ness case is documented and becomes well worn. Just how vital is it? It does head this list of mistakes to avoid!

Source: Condensed from Clive Weightman and Deloitte Consulting, “The Top 10 ERP Mistakes.” Copyright © Clive Weightman. Used with permission.

The project’s executive “angel” must be from the corporate suite and, preferably, not the chief information officer.

4. Selecting a strong systems integrator and then not heeding its advice. In selecting an SI, a company should:

• Consider compatibility. Do you want a firm that wants to come in to do it to you rather than do it with you? Some SI firms favor a “let’s solve this together” approach, while others prefer the “here are your marching orders, this is how it’s going to be, so let’s get down to business.” Determine which approach you favor for your firm’s culture.

• Clearly look at the SI’s track record. Look beyond its marketing, talk to the software vendors you’ll be working with and also talk with industry analysts.

• Spend considerable time examining the members of the actual team that will be working with you every day. Be sure to put lan- guage in the contract that at least binds the team leaders and the firm’s partner with you for its duration.

3. Trying to create a solution incompatible with the company’s culture. In the 1990s, research found that many companies with ERP projects saw them as a silver bullet that would solve all their problems—even if the “style” of solution wasn’t compatible with their corporate culture traditions.

An executive might say he or she wants to operate in a globally centralized fashion—to be more like a Wal-Mart, with the strength and discipline of a global head office. However, this doesn’t work if your firm’s culture is one of decentralized entrepreneurship. You can’t use technology to force change in the culture of your company. So if yours is a very decentralized structure, you’d better opt to install a decentralized ERP applica- tion or recognize the enormous change-management mountain you face.

2. Treating this as a technical project vs. a change that balances people, process, and technology; not using the power of the new, integrated information. The new technology brings inte- gration and, generally, makes information available instantly. For example, when raw material arrives at a company’s receiving dock and is scanned into the system, anyone can access that informa- tion and use it.

Real-time integration and accurate data change people’s jobs. A traditional sales order taker can change into a full-ser- vice customer agent. For example, with full online access to an integrated ERP backbone, the agent enjoys immediate access to the customer’s history and other vital identifiers. The agent can examine real-time open inventory at all warehouses (not just

(concluded)

Conversion to an ERP system from a traditional operation is a major undertaking that requires a project approach to manage the process. The following reading provides some sug- gestions for achieving ERP project success.

ste24102_ch12_494-545.indd 523ste24102_ch12_494-545.indd 523 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

524 Chapter Twelve MRP and ERP

1. The usage of components in production of assembled items depends on how many of each component are needed per item, and how many items are to be produced. Hence the term dependent demand.

2. MRP is a tool used for dependent-demand components, to assist in making the two basic decisions in inventory management: how much of each component to order, and when to order it.

3. MRP II is an enhancement of MRP that gives management the ability to relate financial and other information to an MRP plan.

4. ERP is a software-based enterprise-wide system that allows access to production, sales, accounting, warehouse, and supply chain information.

KEY POINTS

12.12 OPERATIONS STRATEGY

Acquisition of technology on the order of ERP has strategic implications. Among the consider- ations are a high initial cost, a high cost to maintain, the need for future upgrades, and the intensive training required. An ERP team is an excellent example of the value of a cross-functional team. Purchasing, which will ultimately place the order, typically does not have the technical expertise to select the best vendor. Information technology can assess various technical requirements, but won’t be the user. Various functional users (marketing, operations, and accounting) will be in the best position to evaluate inputs and outputs, and finance must evaluate the effect on the organization’s bottom line. Also, it is important to have a member of the purchasing staff involved from the begin- ning of negotiations on ERP acquisition because this will have major implications for purchasing.

The real-time aspect of ERP makes it valuable as a strategic planning tool. For example, it can improve supply chain management, with stronger links between their customers and their sup- pliers, and make the organizations more capable of satisfying changing customer requirements.

Because ERP tracks the flow of information and materials through a company, it offers opportunities for collecting information on waste and environmental costs and, hence, oppor- tunities for process improvement.

MRP is a planning technique that creates a schedule for all the (dependent-demand) items in an end item’s bill of materials based on fixed manufacturing lead times. The end item is exploded using the bill of materials, and material requirements plans are developed that show quantity and timing for ordering or producing components.

The main features of MRP are the time-phasing of requirements, calculating component require- ments, and planned-order releases. To be successful, MRP requires accurate master production sched- ules, bills of materials, and inventory data. Firms without reasonably accurate records or schedules have experienced major difficulties in trying to implement MRP-type systems. A potential weakness of MRP is the assumption of constant lead times.

MRP is utilized by most MRP II and ERP systems. MRP II adds software applications designed to better manage the entire manufacturing process involving finance and marketing, and including capacity planning. ERP is the third generation of manufacturing software that encompasses all business func- tions, including order entry and an option for financial management integrated with the manufacturing functions available in MRP II.

SUMMARY

ste24102_ch12_494-545.indd 524ste24102_ch12_494-545.indd 524 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 525

backflushing, 510 bill of materials (BOM), 497 capacity requirements planning, 513 changes, 508 cumulative lead time, 497 dependent demand, 495 distribution resource planning (DRP), 515 enterprise resource planning (ERP), 516 exception reports, 508 gross requirements, 501

inventory records, 500 load reports, 514 low-level coding, 500 manufacturing resources planning (MRP II), 511 master schedule, 496 material requirements planning (MRP), 495 net-change system, 506 net requirements, 501 order releases, 508 pegging, 505

performance-control reports, 508 planned-order receipts, 502 planned-order releases, 508 planned orders, 502 planning reports, 508 product structure tree, 497 projected on hand, 501 regenerative system, 506 scheduled receipts, 501 time fences, 513

KEY TERMS

SOLVED PROBLEMS

The following product structure tree indicates the components needed to assemble one unit of prod- uct W. Determine the quantities of each component needed to assemble 100 units of W.

An easy way to compute and keep track of component requirements is to do it right on the tree, as shown in the following figure. Note: For the procedure when there are on-hand inventories, see Example 1, page 498.

Summary:

Problem 1

W

A B (2) C (4)

D (2) E E (2) F D (3) G (2)

D

Solution

W

2

1

3 D

A B(2) C(4)

E E(2) F G(2)D(2) D(3)

100

1�100�100 2�100�200

2�100�200 1�100�100 2�200�400 1�200�200 3�400�1200 2�400�800

1�800�800

4�100�400

Level Item Quantity

0 W 100

1 A 100

B 200

C 400

2 E 500

F 200

G 800

3 D 2,200

ste24102_ch12_494-545.indd 525ste24102_ch12_494-545.indd 525 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

526 Chapter Twelve MRP and ERP

Steps 1. If a question asks for a materials requirement plan for a component such as D in the tree dia-

gram, circle all occurrences of that component so you will be sure to include them.

2. Label the spreadsheet sections, top to bottom, following the order shown in the tree diagram: Top section: End Item Next section: A Next section: B Last section: D (You don’t need one for C because the problem asks for D, and C isn’t needed for D.)

3. Add the LT (lead time) for the end item and each component next to the section labels.

4. Add any beginning inventory (on hand) for the end item and each component to their spread- sheet sections.

5. Place the desired end item quantity in the master schedule in the week it is needed, and in the gross requirements of the end item in that same week.

6. Complete the remainder of the plan.

End

D(2) D(4)C(3)

BA(3)

Step 1 Circle all occurrences of the component on the tree diagram.

Problem 2

Item End A B C D

Units on hand 2 6 4 32 15

Lead time (weeks) 1 2 1 2 2

Material Requirements Plan Setup Guide Twelve units of the end item are needed at the beginning of week 6. Prepare a material require-

ments plan for component D given that there is a scheduled receipt of 10 units of subassembly A in week 3 plus the following information:

End

D(2) D(4)C(3)

BA(3)

ste24102_ch12_494-545.indd 526ste24102_ch12_494-545.indd 526 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 527

Master Week 1 2 3 4 5 6

Schedule Quantity

End Beg. Inv.

1 2 3 4 5 6

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

A (3) Beg. Inv.

1 2 3 4 5 6

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

B 1 2 Beg. Inv.

3 4 5 6

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

D(2) D(4) 1 2 3 4 5 6

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Beg. Inv.

Gross requirements

Gross requirements

Step 2. Label spreadsheet sections in the order shown in the tree diagram.

ste24102_ch12_494-545.indd 527ste24102_ch12_494-545.indd 527 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

528 Chapter Twelve MRP and ERP

Master Week 1 2 3 4 5 6

Schedule Quantity

End LT = 1 Beg. Inv.

1 2 3 4 5 6

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

A (3) LT = 2 Beg. Inv.

1 2 3 4 5 6

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

B LT = 1 1 2 Beg. Inv.

3 4 5 6

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planne-order releases

D(2) D(4) LT = 2 1 2 3 4 5 6

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Beg. Inv.

Gross requirements

Gross requirements

Step 3. Add lead times.

ste24102_ch12_494-545.indd 528ste24102_ch12_494-545.indd 528 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 529

Master Week 1 2 3 4 5 6

Schedule Quantity

End LT = 1 Beg. Inv.

1

2

2 3 4 5 6

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

A (3) LT = 2 Beg. Inv.

1 2 3

10

6

4

15

4 5 6

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

B LT = 1 1 2 Beg. Inv.

3 4 5 6

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

D(2) D(4) LT = 2 1 2 3 4 5 6

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Beg. Inv.

Gross requirements

Gross requirements

Step 4. Enter specified beginning inventory and scheduled receipts quantities.

ste24102_ch12_494-545.indd 529ste24102_ch12_494-545.indd 529 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

530 Chapter Twelve MRP and ERP

Master Week 1 2 3 4 5 6

Schedule Quantity

End LT = 1 Beg. Inv.

1

2

2 3 4 5 6

12

12

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

A (3) LT = 2 Beg. Inv.

1 2 3

10

6

4

15

4 5 6

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

B LT = 1 1 2 Beg. Inv.

3 4 5 6

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

D(2) D(4) LT = 2 1 2 3 4 5 6

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Beg. Inv.

Gross requirements

Gross requirements

Step 5 . Enter the master schedule quantities and end item gross requirements in the specified week(s).

ste24102_ch12_494-545.indd 530ste24102_ch12_494-545.indd 530 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 531

Master Week 1 2 3 4 5 6

Schedule Quantity 12

End LT = 1 Beg. Inv.

1 2 3 4 5 6

Gross requirements 12

Scheduled receipts

Projected on hand 2 2 2 2 2 2 2

Net requirements 10

Planned-order receipts 10

Planned-order releases 10

A (3) LT = 2 Beg. Inv.

1 2 3 4 5 6

Gross requirements 30

Scheduled receipts 10

Projected on hand 6 6 6 16 16 16

Net requirements 14

Planned-order receipts 14

Planned-order releases 14

B LT = 1 Beg. Inv.

1 2 3 4 5 6

Gross requirements 10

Scheduled receipts

Projected on hand 4 4 4 4 4 4

Net requirements 6

Planned-order receipts 6

Planned-order releases 6

D(2) D(4) LT = 2 Beg. Inv.

1 2 3 4 5 6

Gross requirements 28 24

Scheduled receipts

Projected on hand 15 15 15 15 24

Net requirements 13 24

Planned-order receipts 13 24

Planned-order releases 13 24

Step 6. Complete the remainder of the plan, starting with the end item and working down, subtracting projected on hand from gross requirements to get net requirements. Planned order receipts = Net requirements, and all are in the same week. Planned order releases are always the same as planned order receipts, but earlier by lead time (one week in this case).

Subassemblies A and B both come under End in the tree diagram, so their gross requirements are in the same column as the End item’s planned-order releases (Week 5), using the multiples given in the tree diagram: 3 times 10 for A = 30 1 times 10 for B = 10

D(2) comes under A in the tree diagram, so its gross requirements are related to A’s planned-order release sand in that same week: 2 times 14 = 28 in week 3

D(4) comes under B in the tree diagram, so its gross requirements are related to B’s planned-order releases and in that same week: 4 times 6 = 24 in week 4

ste24102_ch12_494-545.indd 531ste24102_ch12_494-545.indd 531 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

532 Chapter Twelve MRP and ERP

The product structure tree for end item E follows. The manager wants to know the material require- ments for ordered part R that will be needed to complete 120 units of E by the start of week 5. Lead times for items are one week for level 0 items, one week for level 1 items, and two weeks for level 2 items. There is a scheduled receipt of 60 units of M at the start of week 2 and 100 units of R at the start of week 1. Lot-for-lot ordering is used.

Problem 3

Week number

1 2 3 4 5

Assemble M

Assemble E

Procure R

P N V

I

R

E

M

2

0

1

Level

(2) (4)

(3) (2)

A partial assembly-time chart that includes R and leads to completion of E by the start of week 5 looks like this:

Solution

The table entries are arrived at as follows: Master schedule: 120 units of E to be available at the start of week 5. Item E: Gross requirements equal the quantity specified in the master production schedule.

Since there is no on-hand inventory, net requirements also equal 120 units. Using lot-for-lot ordering, 120 units must be scheduled to be available at the start of week 5. Because there is a one-week lead time for assembly of Es, an order will need to be released (i.e., work started) at the beginning of week 4.

Item M: The gross requirements for M are three times the net requirements for E, because each E requires three Ms. These must be available at the start of week 4. The net requirements are 60 units fewer due to the 60 units expected to be on hand at that time. Hence, 300 additional units of M must be available at the start of week 4. With the one-week lead time, there must be an order release at the start of week 3.

Item R: Because each M requires two units of R, 600 Rs will be needed to assemble 300 units of M. However, 100 units will be on hand, so only 500 need to be ordered. Because there is a lead time of two weeks, the 500 Rs must be ordered at the start of week 1.

The master schedule for E and requirements plans for E, M, and R follow.

ste24102_ch12_494-545.indd 532ste24102_ch12_494-545.indd 532 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 533

Capacity requirements planning. Given the following production schedule in units and the produc- tion standards for labor and machine time for this product, determine the labor and machine capacity requirements for each week. Then compute the percent utilization of labor and machines in each week if labor capacity is 200 hours per week and machine capacity is 250 hours per week.

Problem 4

Item: M LT = 1 week

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Multiplied by 2 (see product tree)

Gross requirements

Item: R LT = 2 weeks

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Gross requirements

300

606060

60

100 100 100

500

360

300

300

600

500

500

Week number 1 2 3 4 5

Quantity

Item: E LT = 1 week

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

Multiplied by 3 (see product tree)

Master schedule for E

Gross requirements

120

120

120

120

120

Beg. Inv.

100

Production Schedule: Week 1 2 3 4

Quantity 200 300 100 150

Standard Times:

Labor .5 hour/unit

Machine 1.0 hour/unit

ste24102_ch12_494-545.indd 533ste24102_ch12_494-545.indd 533 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

534 Chapter Twelve MRP and ERP

Convert the quantity requirements into labor and machine requirements by multiplying the quantity requirements by the respective standard times (i.e., multiply each quantity by .5 to obtain the labor hours and multiply each quantity by 1.0 to obtain the machine hours):

Solution

Week 1 2 3 4

Labor 50% 75% 25% 37.5%

Machine 80% 120% 40% 60%

Week 1 2 3 4

Quantity 200 300 100 150

Labor hours 100 150 50 75

Machine hours 200 300 100 150

To compute utilization, divide the capacity requirements by the available capacity (200 hours per week for labor and 250 hours per week for machine) and multiply by 100. The results are

Note that machine capacity in week 2 is overutilized (i.e., capacity is insufficient) because the utili- zation exceeds 100 percent. To compensate, some production could be shifted to weeks 1 and/or 3 where labor and machine time are available.

1. Contrast independent and dependent demand.

2. When is MRP appropriate?

3. Briefly define or explain each of these terms. a. Master schedule. b. Bill of materials. c. Inventory records. d. Gross requirements. e. Net requirements. f. Time-phased plan.

4. How is safety stock included in a material requirements plan?

5. What factors can create safety stock requirements in an MRP system?

6. What is meant by the term safety time?

7. Contrast net-change systems and regenerative systems for MRP.

8. Briefly discuss the requirements for effective MRP.

9. What are some of the main advantages and limitations of MRP?

10. How can the use of MRP contribute to productivity?

11. Briefly describe MRP II and closed-loop MRP.

12. What is lot sizing, what is its goal, and why is it an issue with lumpy demand?

13. Contrast planned-order receipts and scheduled receipts.

14. If seasonal variations are present, is their incorporation into MRP fairly simple or fairly difficult? Explain briefly.

15. How does the purpose of ERP differ from the purpose of MRP II?

16. What are some unforeseen costs of ERP?

DISCUSSION AND REVIEW QUESTIONS

1. What trade-offs are involved in the decision to purchase an ERP software package?

2. Who in the organization needs to be involved in designing and implementing MRP II? Who needs to be involved in the decision to purchase an ERP system? Who needs to be trained to use ERP?

3. To what extent has technology such as ERP software improved the ability to manage a business organization? How important are each of the following considerations? a. Ease of use. b. Complete integration. c. Reliability.

TAKING STOCK

ste24102_ch12_494-545.indd 534ste24102_ch12_494-545.indd 534 11/29/13 1:08 AM11/29/13 1:08 AM

Final PDF to printer

Chapter Twelve MRP and ERP 535

b. Draw a tree diagram for a stapler given the following bill of materials:

1. Suppose you work for a furniture manufacturer, one of whose products is the chair depicted in Figure 12.5 . Finished goods inventory is held in a central warehouse in anticipation of customer orders. Finished goods are controlled using EOQ/ROP methods. The warehouse manager, Juan Villa, has suggested using the same methods for controlling component inventory. Write him a brief memo outlining your opinion on doing that.

2. Give one example of unethical behavior involving MRP and one involving ERP, and state the ethical principle violated for each example.

CRITICAL THINKING

EXERCISES

1. a. Given the following diagram for a product, determine the quantity of each component required to assemble one unit of the finished product.

PROBLEMS

E

F (2) G H

J (2) D (4) L (2) J (2) D (2)A (4)

Item End B C D E F G H

LT (wk) 1 2 3 3 1 2 1 2

Amount on hand 0 10 10 25 12 30 5 0

Item Components

Stapler Top assembly, base assembly

Top assembly Cover, spring, slide assembly

Cover

Spring

Slide assembly Slide, spring

Slide

Spring

Base assembly Base, strike plate, rubber pad (2)

Base

Strike plate

Rubber pad (2)

2. The following table lists the components needed to assemble an end item, lead times, and quantities on hand.

a. If 20 units of the end item are to be assembled, how many additional units of E are needed? ( Hint: You don’t need to develop an MRP plan to determine this.)

b. An order for the end item is scheduled to be shipped at the start of week 11. What is the latest week that the order can be started and still be ready to ship on time? ( Hint: You don’t need to develop an MRP plan for this part either.)

3. The following table lists the components needed to assemble an end item, lead times (in weeks), and quantities on hand.

End Item

B (2) C D (3)

E (2) F (3) H (4) E (2)G (2) E (2)

ste24102_ch12_494-545.indd 535ste24102_ch12_494-545.indd 535 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

536 Chapter Twelve MRP and ERP

a. Prepare a material requirements plan for component J. b. Suppose that in week 4 the quantity of E needed is changed from 80 to 70. The planned-order releases

through week 3 have all been executed. How many more Bs and Js will be on hand in week 6?

5. a. One hundred twenty units of end item Z are needed at the beginning of week 7. Prepare a material requirements plan for component C. Take into account that on hand there are 40 units of Z, 70 units of A, 100 units of B, and 30 units of C. Also, there is a scheduled receipt of 20 units of component C in week 4. Lead times are two weeks for Z and B, and one week for the other components. Lot- for-lot ordering will be used for all items.

a. If 40 units of the end item are to be assembled, how many additional units of B are needed? ( Hint: You don’t need to develop an MRP plan.)

b. An order for the end item is scheduled to be shipped at the start of week 8. What is the latest week that the order can be started and still be ready to ship on time? ( Hint: You don’t need to develop an MRP plan.)

4. Eighty units of end item E are needed at the beginning of week 6. Three cases (30 units per case) of J have been ordered and one case is scheduled to arrive in week 3, one in week 4, and one in week 5. Note: J must be ordered by the case, and B must be produced in multiples of 120 units. There are 60 units of B and 20 units of J now on hand. Lead times are two weeks each for E and B, and one week for J.

Item Lead Time Amount on Hand Direct Components

End 1 — L(2), C(1), K(3)

L 2 10 B(2), J(3)

C 3 15 G(2), B(2)

K 3 20 H(4), B(2)

B 2 30

J 3 30

G 3 5

H 2 —

E

B(2) J(3)

J(4) F(2)

Z

D(2)C(3) C(2)E(2)

B(4)A(2)

E

I(2)D(2) D(2)S(2)

C(2)B(3)

b. Ninety-five units of end item E are needed at the beginning of week 7. Prepare a material requirements plan for component D. Take into account that 5 units of E are currently on hand, as well as 50 units of B, 100 units of C, and 80 units of D. Also, 30 units of C have been outsourced and are expected to arrive in week 4. Lead times are two weeks for E and C, and one week for the other components. Assume lot-for-lot ordering except for D, where multiples of 40 must be used.

ste24102_ch12_494-545.indd 536ste24102_ch12_494-545.indd 536 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 537

7. Eighty units of end item X are needed at the beginning of week 6, and another 30 units are needed at the beginning of week 8. Prepare a material requirements plan for component D. D can only be ordered in whole cases (50 units per case). One case of D is automatically received every other week, beginning in week 1 (i.e., weeks 1, 3, 5, 7). Lot-for-lot ordering will be used for all items except D. Also, there are 30 units of B and 20 units of D now on hand. Lead times for all items are a function of quantity: one week for up to 100 units, two weeks for 101 to 200 units, three weeks for 201 to 300 units, and four weeks for 301 or more units.

6. A table is assembled using three components, as shown in the accompanying product structure tree. The company that makes the table wants to ship 100 units at the beginning of day 4, 150 units at the beginning of day 5, and 200 units at the beginning of day 7. Receipts of 100 wood sections are scheduled at the beginning of day 2. There are 120 legs on hand. There are 60 braces on hand. Lead times (in days) for all items are shown in the following table. Prepare a material requirements plan using lot-for-lot ordering.

X

B(2) D(3)

D(2) F(2)

A B C

D E D(2) F D(4) G

Quantity Lead Time

1–200 1

201–550 2

551–999 3

Table

Wood sections (2) Legs (4)Braces (3)

8. Oh No!, Inc., sells three models of radar detector units. It buys the three basic models (E, F, and G) from a Japanese manufacturer and adds one, two, or four lights (component D) to further differenti- ate the models. D is bought from a domestic producer.

Lead times are one week for all items except C, which is two weeks. There are ample supplies of the basic units (E, F, and G) on hand. There are also 10 units of B, 10 units of C, and 25 units of D on hand. Lot-sizing rules are lot-for-lot ordering for all items except D, which must be ordered in multiples of 100 units. There is a scheduled receipt of 100 units of D in week 1.

The master schedule calls for 40 units of A in week 4, 60 units of B in week 5, and 30 units of C in week 6. Prepare a material requirements plan for D and its parents.

9. Assume that you are the manager of a shop that assembles power tools. You have just received an order for 50 chain saws, which are to be shipped at the start of week 8. Pertinent information on the saws is

Item Lead Time (weeks) On Hand Components

Saw 2 15 A(2), B(1), C(4)

A 1 10 E(3), D(1)

B 2 5 D(2), F(3)

C 2 65 E(2), D(2)

D 1 20

E 1 10

F 2 30

a. Develop a product structure tree, an assembly time chart, and a master schedule. b. Develop the material requirements plan for component E using lot-for-lot ordering for all items.

ste24102_ch12_494-545.indd 537ste24102_ch12_494-545.indd 537 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

538 Chapter Twelve MRP and ERP

11. Determine material requirements plans for parts N and V and subassembly I as described in Solved Problem 3 (see p. 532) for each of the following:

a. Assume that there are currently 100 Ns on hand and scheduled receipts of 40 Is and 10 Vs at the beginning of week 3. No Es are on hand; 120 Es are needed at the start of week 5.

b. Assume on-hand and scheduled receipts as in part a. Now suppose that 100 Es are needed at the start of week 5 and 55 at the start of week 7. Also, use multiples of these order sizes: N, 800; V, 200. Use lot-for-lot ordering for I.

c. Using your answer to part b, update the MRP for V, using the following additional information for each of these cases: (1) one week has elapsed (making it the start of week 2), and (2) three weeks have elapsed (making it the start of week 4).

The updated master schedule now has an order for 100 units of E in week 9. Your plan should cover weeks 2–9 for case 1, and weeks 4–11 for case 2. Assume all orders are released and received as planned.

12. A firm that produces electric golf carts has just received an order for 200 carts, which must be ready for delivery at the start of week 8. Information concerning the product structure, lead times, and quantities on hand is shown in the following table. Use this information to do each of the following:

a. Construct a product tree. b. Construct an assembly time chart. c. Develop a material requirements plan that will provide 200 golf carts by week 8 assuming lot-

for-lot ordering.

10. Assume that you are the manager of Assembly, Inc. You have just received an order for 40 units of an industrial robot, which is to be delivered at the start of week 7 of your schedule. Using the fol- lowing information, determine how many units of subassembly G to order and the timing of those orders, given that subassembly G must be ordered in multiples of 80 units and all other compo- nents are ordered lot-for-lot. Assume that the components are used only for this particular robot.

Item Lead Time (weeks) On Hand Components

Robot 2 10 B, G, C(3)

B 1 5 E, F

C 1 20 G(2), H

E 2 4 —

F 3 8 —

G 2 15 —

H 1 10 —

Parts List for Electric Golf Cart

Lead Time

Quantity on Hand

Electric golf cart 1 0

Top 1 40

Supports (4) 1 200

Cover 1 0

Base 1 20

Motor 2 300

Body 3 50

Frame 1 35

Controls 1 0

Wheel assemblies (4) 1 240

Seats (2) 2 120

13. Refer to Problem 12. Assume that unusually mild weather has caused a change in the quantity and timing of orders for golf carts. The revised plan calls for 100 golf carts at the start of week 6, 100 at the start of week 8, and 100 at the start of week 9.

a. Develop a master schedule for this revised plan. b. Determine the timing and quantities for orders for tops and bases.

ste24102_ch12_494-545.indd 538ste24102_ch12_494-545.indd 538 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 539

c. Assume that equipment problems reduce the firm’s capacity for assembling bases to 50 units per week. Revise your material plan for bases to reflect this, but still meet delivery dates.

14. Using the diagram below, do the following: a. Draw a tree diagram for the scissors. b. Prepare an MRP plan for scissors. Lead times are one day for each component and final scissor

assembly, but two days for the plastic grips. Six hundred pairs of scissors are needed on day 6. Note: There are 200 straight blades and 350 bent blades on hand, and 40 top blade assemblies on hand. Use lot-for-lot ordering for all items.

Bottom

Top

Bent plastic

grip

Bent blade

Straight plastic grip

Straight blade

15. A company that manufactures paving material for driveways and parking lots expects the following demand for its product for the next four weeks:

Labor Machine

Production standard (hours per ton) 4 3

Weekly production capacity (hours) 300 200

Week number 1 2 3 4

Material (tons) 40 80 60 70

The company’s labor and machine standards and available capacities are as follows:

a. Determine the capacity utilization for labor and machine for each of the four weeks. b. In which weeks do you foresee a problem? What options would you suggest to resolve any

problems? What costs are relevant in making a decision on choosing an option? 16. A company produces two very similar products that go through a three-step sequence of fabrica-

tion, assembly, and packaging. Each step requires one day for a lot to be completely processed and moved to the next department. Processing requirements for the departments (hours per unit) are

FABRICATION ASSEMBLY PACKAGING

Product Labor Machine Labor Machine Labor Machine

A 2 1 1.5 1 1 .5

B 1 1 1 1 1.5 .5

Department capacities are all 700 hours of labor and 500 hours of machine time, except Friday, when capacities are 200 hours for both labor and machine time. The following production sched- ule is for next week:

Product Mon Tues Wed Thurs Fri

A 200 400 100 300 100

B 300 200 200 200 200

a. Determine the labor and machine capacity requirements for each product and the total load for each department for each day. Ignore changeover time.

ste24102_ch12_494-545.indd 539ste24102_ch12_494-545.indd 539 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

540 Chapter Twelve MRP and ERP

18. Develop a material requirements plan for component H. Lead times for the end item and each component except B are one week. The lead time for B is three weeks. Sixty units of A are needed at the start of week 8. There are currently 15 units of B on hand and 130 of E on hand, and 50 units of H are in production and will be completed by the start of week 2. Lot-for-lot ordering will be used for all items.

A

B(2)

D(2) E(2)

C

D(2) E(4)

H(3) K H(3) K

b. Evaluate the projected loading for the first three days of the week. Is the schedule feasible? What do you suggest for balancing the load?

17. The MRP Department has a problem. Its computer “died” just as it spit out the following infor- mation: Planned order release for item J27  �  640 units in week 2. The firm has been able to reconstruct all the information they lost except the master schedule for end item 565. The firm is fortunate because J27 is used only in 565s. Given the following product structure tree and asso- ciated inventory status record information, determine what master schedule entry for 565 was exploded into the material requirements plan that killed the computer.

Part Number On Hand Lot Size Lead Time

565 0 Lot-for-lot 1 week

X43 60 Multiples of 120 1 week

N78 0 Lot-for-lot 2 weeks

Y36 200 Lot-for-lot 1 week

J27 0 Lot-for-lot 2 weeks

565

X43

J27 (4) X43

Y36 (2) N78

The company can complete final assembly of the tractor-trailers at the rate of 10,000 a week. The trac- tor and trailer bodies are purchased; lead time is three weeks. The wheels are the manager’s main concern.

The company has a sufficient supply of brackets on hand. Assem- bly time is one week each for tractors, trailers, and wheel assembly. However, the wheel department can only produce wheels at the rate of 100,000 a week. The manager plans to use the wheel department to full capacity, starting in week 2 of the schedule, and order additional wheels from a supplier as needed. Ordered wheels come in sets of 6,400. The lead time for delivery from the supplier is expected to be two to three weeks. Use lot-for-lot ordering for all items except the pur- chased wheels.

Questions 1. How many wheels sets should the manager order? 2. When should the wheel sets be ordered?

Promotional Novelties provides a wide range of novelty items for its corporate customers. It has just received an order for 20,000 toy trac- tor-trailers that will be sold by a regional filling station company as part of a holiday promotion. The order is to be shipped at the beginning of week 8. The tree diagram shows the various components of the trucks.

CASE Promotional Novelties

Tractor-trailer

Tractor

Wheel assembly

Body

Trailer

Wheel assembly

Body

Wheels (6) Bracket Wheels (12) Bracket

ste24102_ch12_494-545.indd 540ste24102_ch12_494-545.indd 540 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 541

One of Marty’s partners, Ann, has organized information on lead times, inventory on hand, and lot-sizing rules (established by suppliers):

Scheduled receipts are

After the dot-com business he tried to start folded, David “Marty” Dawkins decided to pursue his boyhood dream of owning a bike factory. After several false starts, he finally got the small company up and running. The company currently assembles two models Marty designed: the Arrow and the Dart. The company hasn’t turned a profit yet, but Marty feels that once he resolves some of the problems he’s having with inventory and scheduling, he can increase productivity and reduce costs.

At first, he ordered enough bike parts and subassemblies for four months’ worth of production. Parts were stacked all over the place, seriously reducing work space and hampering movement of workers and materials. And no one knew exactly where anything was. In Marty’s words, “It was a solid mess!”

He and his two partners eventually managed to work off most of the inventory. They hope to avoid similar problems in the future by using a more orderly approach. Marty’s first priority is to develop a materi- als requirement plan for upcoming periods. He wants to assemble 15 Arrows and 10 Darts each week, to have them ready at the start of weeks 4 through 8. The product structure trees for the two bikes follow.

CASE DMD Enterprises

Arrow

X

F

M W

Dart

K(2) F

W(2) Q

Item Lead Time (weeks) On Hand Lot-Sizing Rule

Arrow 2 5 Lot-for-lot

Dart 2 2 Lot-for-lot

X 1 5 Multiples of 25

W 2 * 2 Multiples of 12

F 1 10 Multiples of 30

K 1 3 Lot-for-lot

Q 1 15 Multiples of 30

M 1 0 Lot-for-lot

*LT  �  3 weeks for orders of 36 or more units on this item.

Period 1: 20 Arrows and 18 Ws

Period 2: 20 Darts and 15 Fs

As the third partner, it is your job to develop the material require- ments plan.

Introduction

www.stickley.com

L.&J.G. Stickley was founded in 1900 by brothers Leopold and George Stickley. Located just outside of Syracuse, New York, the company is a producer of fine cherry, white oak, and mahogany furniture. In the 1980s, the company reintroduced the company’s original line of mis- sion oak furniture, which now accounts for nearly 50 percent of the company’s sales.

Over the years, the company experienced both good and bad times, and at one point, it employed over 200 people. But by the early 1970s, the business was in disarray; there were only about 20 full-time employees, and the company was on the brink of bankruptcy. The present owners bought the ailing firm in 1974, and under their leadership, the company has prospered and grown, and now has 1,350 employees. Stickley has five retail showrooms in New York State, two in Connecticut, one in North Carolina, and its furniture is sold nationally by some 120 dealers.

Production The production facility is a large, rectangular build- ing with a 30-foot ceiling. Furniture making is labor intensive, although saws, sanders, and other equipment are very much a part of the pro- cess. In fact, electric costs average about $60,000 a month. The com- pany has its own tool room where cutting tools are sharpened, and replacement parts are produced as needed.

Worker skills range from low-skilled material handlers to highly skilled craftsmen. For example, seven master cabinet makers handle customized orders.

The process (see figure on p. 543) begins with various sawing oper- ations where large boards received from the lumber mills are cut into smaller sizes. The company recently purchased a computer-controlled “optimizer” saw that greatly improves sawing productivity, and elimi- nates some waste. Workers inspect and mark knot locations and other defects they find on each piece of lumber before feeding it into the saw. The computer then determines the optimal set of cuttings, given the

OPERATIONS TOUR Stickley Furniture

(continued )

ste24102_ch12_494-545.indd 541ste24102_ch12_494-545.indd 541 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

542 Chapter Twelve MRP and ERP

The company uses a level production plan (maintain steady output and steady labor force). Demand is seasonal; it is highest in the first and third quarters. During the second and fourth quarters, excess output goes into inventory; during the first and third quarters, excess demand is met using inventory. The production scheduler uses a schedule that is set for the next 8 to 10 weeks.

Production Control Job sequence is determined by the amount of remaining inventory (days’ supply on hand), and processing time. Lot sizes are determined by factoring in demand, setup costs, and carrying costs. Typical lot sizes are 25 to 60 pieces. There are many jobs being done concur- rently. Each job is accompanied by a set of bar codes that identify the job and the operation. As each operation is completed, the operator removes a bar code sticker and delivers it to the scheduling office where it is scanned into the computer, thereby enabling production control to keep track of progress on a job, and to know its location in the shop.

The company’s policy of level output coupled with seasonal demand patterns means that prior to peak demand periods, excess output is used to build up inventories, which is then drawn down when demand exceeds production capacity during periods of peak production.

Inventory In addition to the “white” inventory and a small finished goods inven- tory, the company maintains an inventory of furniture pieces (e.g., table and chair legs) and partially assembled items. This inventory serves two important functions. One is to reduce the amount of time needed to respond to customer orders rather than having to go through the entire

location of knots and other defects, and standard lengths needed for subsequent operations. Approximately 20,000 board feet are cut each day. Subsequent sawing operations provide additional cuts for specific jobs.

Workers then glue some of the pieces together; they will end up as tops of tables, desks, dressers, or a similar item. Large presses hold 20 to 30 glued sections at a time. Other pieces that will become table or chair legs, chair backs or other items go through various shaping opera- tions. Next comes a series of sanding operations, which remove excess glue from the glued sections, and smooth the surface of both glued pieces and other pieces.

Some of the pieces may require drilling or mortising, an operation in which rectangular holes and other shapes are cut into the wood. The company has a CNC (numerically controlled) router that can be pro- grammed to make grooves and other specialty cuts. Some items require carving, which involves highly skilled workers.

Next, workers assemble the various components, either into subas- semblies, or sometimes directly to other components to obtain com- pleted pieces. Each item is stamped with the date of production, and components such as dresser drawers, cabinet doors, and expansion leaves of tables also are stamped to identify their location (e.g., top drawer, left door). Careful records are kept so that if a piece of furniture is ever returned for repairs, complete instructions are available (type of wood, finish, etc.) to enable repair people to closely match the original piece.

The furniture items then usually move to the “white inventory” (unfinished) section, and eventually to the finishing department where workers apply linseed oil or another finish before the items are moved to the finished goods inventory to await shipment to stores or customers.

(continued )

© L. & J.G. Stickley, Inc.

ste24102_ch12_494-545.indd 542ste24102_ch12_494-545.indd 542 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

Chapter Twelve MRP and ERP 543

an inventory of commonly used pieces and subassemblies. Moreover, because pieces are being made for inventory, there is flexibility in sequencing. This permits jobs that have similar setups to be produced in sequence, thereby reducing setup time and cost.

production process to obtain needed items, and the other is that it helps to smooth production and utilize idle machinery/workers. Because of unequal job times on successive operations, some workstations invari- ably have slack time while others work at capacity. This is used to build

Assembly

Assembly area

White inventory

Finishing area

Finished inventory

Office

Finished pieces and

subassemblies

Stacks of raw lumber

Custom shop

Optimizer saw

Saw

Saw

Sander Sander

Sander

Sander

Sander

Gluing machine

Gluing machine

Gluing machine

Gluing machine

Router

Router

CNC router

CNC router Tool

shop

(continued )

ste24102_ch12_494-545.indd 543ste24102_ch12_494-545.indd 543 11/14/13 10:16 AM11/14/13 10:16 AM

Final PDF to printer

544 Chapter Twelve MRP and ERP

Hopp, Wallace, and Mark L. Spearman. Factory Physics. 3rd ed. New York: Irwin/McGraw-Hill, 2007.

Jacobs, F. Robert, William L. Berry, D. Clay Whybark, and Thomas E. Vollman. Manufacturing Planning

and Control for Supply Chain Management. 6th ed. Burr Ridge, IL: McGraw-Hill/Irwin, 2011.

Wagner, Brett, and Ellen Monk. Enterprise Resource Planning. 3rd ed. Cengage Learning, 2008.

SELECTED BIBLIOGRAPHY AND FURTHER READINGS

Why? What other type of processing is used to a lesser extent? Explain.

2. How does management keep track of job status and location during production?

3. Suppose the company has just received an order for 40 mission oak dining room sets. Briefly list the kinds of information the company will need to plan, schedule, and process this job.

4. What benefits, and what problems, would you expect, given the company’s level production policy?

5. Can you suggest any changes that might be beneficial to the com- pany? What are they?

Quality Each worker is responsible for checking his or her quality, as well as the quality of materials received from preceding operations, and to report any deficiencies. In addition, on several difficult operations, quality con- trol people handle inspections and work with operators to correct any deficiencies. The company is considering a TQM approach, but has not yet made a decision on whether to go in that direction.

Questions

1. Which type of production processing—job shop, batch, repetitive, or continuous—is the primary mode of operation at Stickley Furniture?

(concluded)

ste24102_ch12_494-545.indd 544ste24102_ch12_494-545.indd 544 11/29/13 1:09 AM11/29/13 1:09 AM

Final PDF to printer

This page intentionally left blank

546

C H A P T E R

13 Inventory Management CHAPTER OUTLINE

13.1 Introduction, 547

13.2 The Nature and Importance of Inventories, 548 Functions of Inventory, 549

Objective of Inventory Management, 550

13.3 Requirements for Effective Inventory Management, 551 Inventory Counting Systems, 551

Demand Forecasts and Lead-Time Information, 553

Inventory Costs, 553

Classification System, 554

13.4 Inventory Ordering Policies, 557

13.5 How Much to Order: Economic Order Quantity Models, 557 Basic Economic Order Quantity (EOQ) Model, 557

Economic Production Quantity (EPQ), 561

Quantity Discounts, 564

13.6 Reorder Point Ordering, 569

13.7 How Much to Order: Fixed-Order- Interval Model, 573 Reasons for Using the Fixed-Order- Interval Model, 574

Determining the Amount to Order, 574

Benefits and Disadvantages, 576

13.8 The Single-Period Model, 576 Continuous Stocking Levels, 577

Discrete Stocking Levels, 578

13.9 Operations Strategy, 581

Cases: UPD Manufacturing, 596 Harvey Industries, 596

Grill Rite, 598

Farmers Restaurant, 599

Operations Tours: Bruegger's Bagel Bakery, 600

PSC, Inc., 601

After completing this chapter, you should be able to:

LO13.1 Define the term inventory.

LO13.2 List the different types of inventory.

LO13.3 Describe the main functions of inventories.

LO13.4 Discuss the main requirements for effective management.

LO13.5 Explain periodic and perpetual review systems.

LO13.6 Describe the costs that are relevant for inventory management.

LO13.7 Describe the A-B-C approach and explain how it is useful.

LO13.8 Describe the basic EOQ model and its assumptions and solve typical problems.

LO13.9 Describe the economic production quantity model and solve typical problems.

LO13.10 Describe the quantity discount model and solve typical problems.

LO13.11 Describe reorder point models and solve typical problems.

LO13.12 Describe situations in which the fixed-order interval model is appropriate, and solve typical problems.

LO13.13 Describe situations in which the single-period model is appropriate and solve typical problems.

LEARNING OBJECTIVES

ste24102_ch13_546-603.indd 546ste24102_ch13_546-603.indd 546 11/14/13 10:56 AM11/14/13 10:56 AM

Final PDF to printer

547

Inventory management is a core operations management activity. Effective inventory manage- ment is important for the successful operation of most businesses and their supply chains. Inventory management impacts operations, marketing, and finance. Poor inventory manage- ment hampers operations, diminishes customer satisfaction, and increases operating costs.

Some organizations have excellent inventory management, and many have satisfactory inventory management. Too many, however, have unsatisfactory inventory management. They either have too little or too much inventory, inaccurate inventory tracking, or incorrect pri- orities. What is lacking is an understanding of what needs to be done and how to do it. This chapter presents the concepts and knowledge base for effective inventory management.

13.1 INTRODUCTION An inventory is a stock or store of goods. Firms typically stock hundreds or even thousands of items in inventory, ranging from small things such as pencils, paper clips, screws, nuts, and bolts to large items such as machines, trucks, construction equipment, and airplanes. Natu- rally, many of the items a firm carries in inventory relate to the kind of business it engages in. Thus, manufacturing firms carry supplies of raw materials, purchased parts, partially fin- ished items, and finished goods, as well as spare parts for machines, tools, and other supplies. Department stores carry clothing, furniture, carpeting, stationery, cosmetics, gifts, cards, and toys. Some also stock sporting goods, paints, and tools. Hospitals stock drugs, surgical sup- plies, life-monitoring equipment, sheets and pillow cases, and more. Supermarkets stock fresh and canned foods, packaged and frozen foods, household supplies, magazines, baked goods, dairy products, produce, and other items.

The inventory models described in this chapter relate primarily to what are referred to as independent-demand items, that is, items that are ready to be sold or used. Chapter 12 described models that are used for dependent-demand items, which are components of fin- ished products, rather than the finished products themselves. Thus, a computer would be an

LO13.1 Define the term inventory.

Inventory  A stock or store of goods.

ste24102_ch13_546-603.indd 547ste24102_ch13_546-603.indd 547 11/14/13 10:56 AM11/14/13 10:56 AM

Final PDF to printer

548 Chapter Thirteen Inventory Management

independent-demand item, while the components that are used to assemble a computer would be dependent-demand items: The demand for those items would depend on how many of each item is needed for a computer, as well as how many computers are going to be made.

13.2 THE NATURE AND IMPORTANCE OF INVENTORIES Inventories are a vital part of business. Not only are they necessary for operations, but they also contribute to customer satisfaction. To get a sense of the significance of inventories, consider the following: Some very large firms have tremendous amounts of inventory. For example, General Motors was at one point reported to have as much as $40 billion worth of materials, parts, cars, and trucks in its supply chain! Although the amounts and dollar values of inventories carried by different types of firms vary widely, a typical firm probably has about 30 percent of its cur- rent assets and perhaps as much as 90 percent of its working capital invested in inventory. One widely used measure of managerial performance relates to return on investment (ROI), which is profit after taxes divided by total assets. Because inventories may represent a significant portion of total assets, a reduction of inventories can result in a significant increase in ROI, although that benefit has to be weighed against a possible risk of a decrease in customer service. It is interest- ing to note that the ratio of inventories to sales in the manufacturing, wholesale, and retail sec- tors is one measure that is used to gauge the health of the U.S. economy.

Inventory decisions in service organizations can be especially critical. Hospitals, for example, carry an array of drugs and blood supplies that might be needed on short notice. Being out of stock on some of these could imperil the well-being of a patient. However, many of these items have a limited shelf life, so carrying large quantities would mean having to dispose of unused, costly sup- plies. On-site repair services for computers, printers, copiers, and fax machines also have to care- fully consider which parts to bring to the site to avoid having to make an extra trip to obtain parts. The same goes for home repair services such as electricians, appliance repairers, and plumbers.

The major source of revenues for retail and wholesale businesses is the sale of merchandise (i.e., inventory). In fact, in terms of dollars, the inventory of goods held for sale is one of the largest assets of a merchandising business. Retail stores that sell clothing wrestle with decisions about which styles to carry, and how much of each to carry, knowing full well that fast-selling items will mean greater profits than having to heavily discount goods that didn't sell.

The different kinds of inventories include the following:

Raw materials and purchased parts.

Partially completed goods, called work-in-process (WIP).

LO13.2 List the different types of inventory.

the point home to upper management? I sug- gested that he go to the accounting depart- ment and borrow enough money to be equal to the bin's value for as long as it had been sitting there, and pile it on the top of the bin. I further suggested that he do that for every bin on the production line. We rapidly figured out that by the time we had the money piled up on the bin, you would not even be able to see the bin. My opinion was that if the upper managers were given a tour of the line with the money piled up, they would never forget it.

Source: Gene Woolsey, “On Doing Good Things and Dumb Things in Production and Inventory Control,” Interfaces 5, no. 3 (May 1975). Copyright © 1975 The Institute for Operations Research and the Management Sciences (INFORMS). Reprinted by permission.

We proceed as follows. First look for a five-by-five-by-three-foot bin of gears or parts that looks like it has been there awhile. Pick up a gear and ask, casually, “How much is this worth?” You then ask, “How many of these are in the bin?” followed by, “How long has this bin been here?” and, “What's your cost of money for this company?” I recall one case in a nameless South American country where the unit cost times the number of parts times the time it had been there times the interest rate resulted in a cost-per-day figure that would insure com- fortable retirement for the plant manager on the bank of the Rio de la Plata at one of the better resorts to be found there. The plant manager suddenly realized that what he was holding was not just a chunk of high-test steel, but was real money. He then pointed out that he now understood the value of the inventory but could I suggest a way to drive

READING $$$

ste24102_ch13_546-603.indd 548ste24102_ch13_546-603.indd 548 11/14/13 10:56 AM11/14/13 10:56 AM

Final PDF to printer

Chapter Thirteen Inventory Management 549

Finished-goods inventories (manufacturing firms) or merchandise (retail stores).

Tools and supplies.

Maintenance and repairs (MRO) inventory.

Goods-in-transit to warehouses, distributors, or customers (pipeline inventory).

Both manufacturing and service organizations have to take into consideration the space requirements of inventory. In some cases, space limitations may pose restrictions on inventory storage capability, thereby adding another dimension to inventory decisions.

To understand why firms have inventories at all, you need to be aware of the various func- tions of inventory.

Functions of Inventory Inventories serve a number of functions. Among the most important are the following:

1. To meet anticipated customer demand. A customer can be a person who walks in off the street to buy a new stereo system, a mechanic who requests a tool at a tool crib, or a manufacturing operation. These inventories are referred to as anticipation stocks because they are held to satisfy expected (i.e., average ) demand.

2. To smooth production requirements. Firms that experience seasonal patterns in demand often build up inventories during preseason periods to meet overly high require- ments during seasonal periods. These inventories are aptly named seasonal inventories. Companies that process fresh fruits and vegetables deal with seasonal inventories. So do stores that sell greeting cards, skis, snowmobiles, or Christmas trees.

3. To decouple operations. Historically, manufacturing firms have used inventories as buffers between successive operations to maintain continuity of production that would otherwise be disrupted by events such as breakdowns of equipment and accidents that cause a portion of the operation to shut down temporarily. The buffers permit other operations to continue temporarily while the problem is resolved. Similarly, firms have used buffers of raw materials to insulate production from disruptions in deliveries from suppliers, and finished goods inventory to buffer sales operations from manufacturing

LO13.3 Describe the main functions of inventories.

By initiating a program that utilizes bar codes and scanners, such as this one by Motorola, hospitals can control inventory supply areas, as well as keep track of all equipment in use across the enterprise. Stockroom inventory applications track consumable items such as medication and supplies, while check in/out applications track shared or reusable items such as X-rays, lab results, diagnostic tools, and other medical equipment.

ste24102_ch13_546-603.indd 549ste24102_ch13_546-603.indd 549 11/14/13 10:56 AM11/14/13 10:56 AM

Final PDF to printer

550 Chapter Thirteen Inventory Management

disruptions. More recently, companies have taken a closer look at buffer inventories, recognizing the cost and space they require, and realizing that finding and eliminating sources of disruptions can greatly decrease the need for decoupling operations.

Inventory buffers are also important in supply chains. Careful analysis can reveal both points where buffers would be most useful and points where they would merely increase costs without adding value.

4. To reduce the risk of stockouts. Delayed deliveries and unexpected increases in demand increase the risk of shortages. Delays can occur because of weather conditions, supplier stockouts, deliveries of wrong materials, quality problems, and so on. The risk of shortages can be reduced by holding safety stocks, which are stocks in excess of expected demand to compensate for variabilities in demand and lead time.

5. To take advantage of order cycles. To minimize purchasing and inventory costs, a firm often buys in quantities that exceed immediate requirements. This necessitates storing some or all of the purchased amount for later use. Similarly, it is usually economical to produce in large rather than small quantities. Again, the excess output must be stored for later use. Thus, inventory storage enables a firm to buy and produce in economic lot sizes without having to try to match purchases or production with demand requirements in the short run. This results in periodic orders or order cycles.

6. To hedge against price increases. Occasionally a firm will suspect that a substantial price increase is about to occur and purchase larger-than-normal amounts to beat the increase.

7. To permit operations. The fact that production operations take a certain amount of time (i.e., they are not instantaneous) means that there will generally be some work-in- process inventory. In addition, intermediate stocking of goods—including raw materi- als, semifinished items, and finished goods at production sites, as well as goods stored in warehouses—leads to pipeline inventories throughout a production-distribution system. Little's Law can be useful in quantifying pipeline inventory. It states that the average amount of inventory in a system is equal to the product of the average rate at which inventory units leave the system (i.e., the average demand rate) and the average time a unit is in the system. Thus, if units are in the system for an average of 10 days, and the demand rate is 5 units per day, the average inventory is 50 units: 5  units/ day  �  10 days  �  50 units.

8. To take advantage of quantity discounts. Suppliers may give discounts on large orders.

Objective of Inventory Management Inadequate control of inventories can result in both under- and overstocking of items. Under- stocking results in missed deliveries, lost sales, dissatisfied customers, and production bot- tlenecks; overstocking unnecessarily takes up space and ties up funds that might be more productive elsewhere. Although overstocking may appear to be the lesser of the two evils, the price tag for excessive overstocking can be staggering when inventory holding costs are high—as illustrated by the reading about the bin of gears at the beginning of the chapter—and matters can easily get out of hand. It is not unheard of for managers to discover that their firm has a 10-year supply of some item. (No doubt the firm got a good buy on it!)

Inventory management has two main concerns. One is the level of customer service, that is, to have the right goods, in sufficient quantities, in the right place, at the right time. The other is the costs of ordering and carrying inventories.

The overall objective of inventory management is to achieve satisfactory levels of customer service while keeping inventory costs within reasonable bounds. Toward this end, the decision maker tries to achieve a balance in stocking. He or she must make two fundamental decisions: the timing and size of orders (i.e., when to order and how much to order). The greater part of this chapter is devoted to models that can be applied to assist in making those decisions.

Managers have a number of performance measures they can use to judge the effectiveness of inventory management. The most obvious, of course, is customer satisfaction, which they might measure by the number and quantity of backorders and/or customer complaints. A widely

Little's Law  The average amount of inventory in a sys- tem is equal to the product of the average demand rate and the average time a unit is in the system.

ste24102_ch13_546-603.indd 550ste24102_ch13_546-603.indd 550 11/14/13 10:56 AM11/14/13 10:56 AM

Final PDF to printer

Chapter Thirteen Inventory Management 551

used measure is inventory turnover , which is the ratio of annual cost of goods sold to average inventory investment. The turnover ratio indicates how many times a year the inventory is sold. Generally, the higher the ratio, the better, because that implies more efficient use of inventories. However, the desirable number of turns depends on the industry and what the profit margins are. The higher the profit margins, the lower the acceptable number of inventory turns, and vice versa. Also, a product that takes a long time to manufacture, or a long time to sell, will have a low turnover rate. This is often the case with high-end retailers (high profit margins). Con- versely, supermarkets (low profit margins) have a fairly high turnover rate. Note, though, that there should be a balance between inventory investment and maintaining good customer service. Managers often use inventory turnover to evaluate inventory management performance; moni- toring this metric over time can yield insights into changes in performance.

Another useful measure is days of inventory on hand, a number that indicates the expected number of days of sales that can be supplied from existing inventory. Here, a balance is desir- able; a high number of days might imply excess inventory, while a low number might imply a risk of running out of stock.

13.3 REQUIREMENTS FOR EFFECTIVE INVENTORY MANAGEMENT Management has two basic functions concerning inventory. One is to establish a system to keep track of items in inventory, and the other is to make decisions about how much and when to order. To be effective, management must have the following:

1. A system to keep track of the inventory on hand and on order.

2. A reliable forecast of demand that includes an indication of possible forecast error.

3. Knowledge of lead times and lead time variability.

4. Reasonable estimates of inventory holding costs, ordering costs, and shortage costs.

5. A classification system for inventory items.

Let's take a closer look at each of these requirements.

Inventory Counting Systems Inventory counting systems can be periodic or perpetual. Under a periodic system , a physical count of items in inventory is made at periodic, fixed intervals (e.g., weekly, monthly) in order to decide how much to order of each item. Many small retailers use this approach: A manager periodically checks the shelves and stockroom to determine the quantity on hand. Then the manager estimates how much will be demanded prior to the next delivery period and bases the order quantity on that information. An advantage of this type of system is that orders for many items occur at the same time, which can result in economies in processing and ship- ping orders. There are also several disadvantages of periodic reviews. One is a lack of control between reviews. Another is the need to protect against shortages between review periods by carrying extra stock.

A perpetual inventory system (also known as a continuous review system) keeps track of removals from inventory on a continuous basis, so the system can provide information on the current level of inventory for each item. When the amount on hand reaches a predetermined minimum, a fixed quantity, Q, is ordered. An obvious advantage of this system is the control provided by the continuous monitoring of inventory withdrawals. Another advantage is the fixed-order quantity; management can determine an optimal order quantity. One disadvantage of this approach is the added cost of record keeping. Moreover, a physical count of inventories must still be performed periodically to verify records because of possible errors, pilferage, spoilage, and other factors that can reduce the effective amount of inventory. Bank transac- tions such as customer deposits and withdrawals are examples of continuous recording of inventory changes.

Inventory turnover  Ratio of annual cost of goods sold to average inventory investment.

LO13.4 Discuss the main requirements for effective management.

LO13.5 Explain periodic and perpetual review systems.

Periodic system  Physical count of items in inventory made at periodic intervals (weekly, monthly).

Perpetual inventory sys- tem  System that keeps track of removals from inventory contin- uously, thus monitoring current levels of each item.

ste24102_ch13_546-603.indd 551ste24102_ch13_546-603.indd 551 11/14/13 10:56 AM11/14/13 10:56 AM

Final PDF to printer

552 Chapter Thirteen Inventory Management

Perpetual systems range from very simple to very sophisticated. A two-bin system , a very elementary system, uses two containers for inventory. Items are withdrawn from the first bin until its contents are exhausted. It is then time to reorder. Sometimes an order card is placed at the bottom of the first bin. The second bin contains enough stock to satisfy expected demand until the order is filled, plus an extra cushion of stock that will reduce the chance of a stockout if the order is late or if usage is greater than expected. The advantage of this system is that there is no need to record each withdrawal from inventory; the disadvantage is that the reorder card may not be turned in for a variety of reasons (e.g., misplaced, the person responsible forgets to turn it in). Supermarkets, discount stores, and department stores have always been major users of peri- odic counting systems. Today, most have switched to computerized checkout systems using a laser scanning device that reads a universal product code (UPC) , or bar code, printed on an item tag or on packaging. A typical grocery product code is illustrated here:

The zero on the left of the bar code identifies this as a grocery item, the first five numbers (14800) indicate the manufacturer (Mott's), and the last five numbers (23208) indicate the specific item (natural-style applesauce). Items in small packages, such as candy and gum, use a six-digit number.

Point-of-sale (POS) systems electronically record actual sales. Knowledge of actual sales can greatly enhance forecasting and inventory management: By relaying information about actual demand in real time, these systems enable management to make any necessary changes to restocking decisions. These systems are being increasingly emphasized as an important input to effective supply chain management by making this information available to suppliers.

UPC scanners represent major benefits to supermarkets. In addition to their increase in speed and accuracy, these systems give managers continuous information on inventories, reduce the need for periodic review and order-size determinations, and improve the level of customer service by indicating the price and quantity of each item on the customer's receipt.

Two-bin system  Two contain- ers of inventory; reorder when the first is empty.

Universal product code (UPC)  Bar code printed on a label that has information about the item to which it is attached.

14800 23208

0

Point-of-sale (POS) systems   Record items at time of sale.

Poor inventory accuracy leads to too much inventory or shortages. Software systems maintain enormous amounts of data and have a great amount of functionality. Systems can analyze inventory levels, allocate stock plan purchases, and allocate deliveries accordingly. They can identify key suppliers of each stocked item and can give lead times and dock-to-stock times for realistic time-phasing.

ste24102_ch13_546-603.indd 552ste24102_ch13_546-603.indd 552 11/14/13 10:56 AM11/14/13 10:56 AM

Final PDF to printer

Chapter Thirteen Inventory Management 553

Bar coding is important for other sectors of business besides retailing. Manufacturing and ser- vice industries benefit from the simplified production and inventory control it provides. In manu- facturing, bar codes attached to parts, subassemblies, and finished goods greatly facilitate counting and monitoring activities. Automatic routing, scheduling, sorting, and packaging can also be done using bar codes. In health care, the use of bar codes can help to reduce drug dispensing errors.

Radio frequency identification (RFID) tags are also used to keep track of inventory in cer- tain applications.

Demand Forecasts and Lead-Time Information Inventories are used to satisfy demand requirements, so it is essential to have reliable estimates of the amount and timing of demand. Similarly, it is essential to know how long it will take for orders to be delivered. In addition, managers need to know the extent to which demand and lead time (the time between submitting an order and receiving it) might vary; the greater the poten- tial variability, the greater the need for additional stock to reduce the risk of a shortage between deliveries. Thus, there is a crucial link between forecasting and inventory management.

Inventory Costs Four basic costs are associated with inventories: purchase, holding, ordering, and shortage costs.

Purchase cost is the amount paid to a vendor or supplier to buy the inventory. It is typi- cally the largest of all inventory costs.

Holding, or carrying, costs relate to physically having items in storage. Costs include interest, insurance, taxes (in some states), depreciation, obsolescence, deterioration, spoil- age, pilferage, breakage, tracking, picking, and warehousing costs (heat, light, rent, workers, equipment, security). They also include opportunity costs associated with having funds that could be used elsewhere tied up in inventory. Note that it is the variable portion of these costs that is pertinent.

The significance of the various components of holding cost depends on the type of item involved, although taxes, interest, and insurance are generally based on the dollar value of an inventory. Items that are easily concealed (e.g., pocket cameras, transistor radios, calculators) or fairly expensive (cars, TVs) are prone to theft. Fresh seafood, meats and poultry, produce, and baked goods are subject to rapid deterioration and spoilage. Dairy products, salad dress- ings, medicines, and batteries also have limited shelf lives.

Holding costs are stated in either of two ways: as a percentage of unit price or as a dollar amount per unit. Typical annual holding costs range from 20 percent to 40 percent or more of the value of an item. In other words, to hold a $100 item in inventory for one year could cost from $20 to $40.

Lead time  Time interval between ordering and receiving the order.

Purchase cost  The amount paid to buy the inventory.

Holding (carrying) cost  Cost to carry an item in inventory for a length of time, usually a year.

LO13.6 Describe the costs that are relevant for inventory management.

In agriculture, fruit growers might use RFID tags to constantly monitor temperatures around fruit during shipping. This ensures that the fruit is kept at the appropriate temperature. The tags can be used for a wide range of agricultural products, containing information such as cultivation history, as well as whether the fruit is organically grown and what fertilizers or chemicals have been used.

Because major retail chains, such as Walmart and Target, and gov- ernmental agencies now require their suppliers to use RFID tags, many companies have already made RFID a priority in their business strategies.

Although RFID technology holds the potential for improved safety, convenience, and inventory management, widespread adoption, partic- ularly in retail operations, could take several years. Until a global stan- dard is established and cheap disposable tags are developed, the main areas of growth continue to be in nonretail operations.

Keeping track of inventories in-house and throughout a supply chain is vitally important for manufacturing, service, and retail operations. Bar codes have long been used for that purpose, but they carry only a limited amount of information and require direct line-of-sight to be scanned. Radio frequency identification (RFID) tags are a technological breakthrough in inventory management, providing real-time informa- tion that increases the ability to track and process shipping containers, parts in warehouses, items on supermarket shelves, and a whole lot more. They carry much more information than bar codes, and they don't require line-of-sight to be scanned.

RFID tags transmit product information or other data to network- connected RFID readers via radio waves. Tags attached to pallets, boxes, or individual items can enable a business to identify, track, moni- tor, or locate any object that is within range of a reader. For example, the tags are used in “speed passes” for toll roads.

READING Radio Frequency Identification (RFID) Tags

ste24102_ch13_546-603.indd 553ste24102_ch13_546-603.indd 553 11/14/13 10:56 AM11/14/13 10:56 AM

Final PDF to printer

554 Chapter Thirteen Inventory Management

Ordering costs are the costs of ordering and receiving inventory. They are the costs that occur with the actual placement of an order. They include determining how much is needed, preparing invoices, inspecting goods upon arrival for quality and quantity, and moving the goods to temporary storage. Ordering costs are generally expressed as a fixed dollar amount per order, regardless of order size.

When a firm produces its own inventory instead of ordering it from a supplier, machine setup costs (e.g., preparing equipment for the job by adjusting the machine, changing cutting tools) are analogous to ordering costs; that is, they are expressed as a fixed charge per produc- tion run, regardless of the size of the run.

Shortage costs result when demand exceeds the supply of inventory on hand. These costs can include the opportunity cost of not making a sale, loss of customer goodwill, late charges, backorder costs, and similar costs. Furthermore, if the shortage occurs in an item carried for internal use (e.g., to supply an assembly line), the cost of lost production or downtime is con- sidered a shortage cost. Such costs can easily run into hundreds of dollars a minute or more. Shortage costs are sometimes difficult to measure, and they may be subjectively estimated.

Classification System An important aspect of inventory management is that items held in inventory are not of equal importance in terms of dollars invested, profit potential, sales or usage volume, or stockout pen- alties. For instance, a producer of electrical equipment might have electric generators, coils of wire, and miscellaneous nuts and bolts among the items carried in inventory. It would be unreal- istic to devote equal attention to each of these items. Instead, a more reasonable approach would be to allocate control efforts according to the relative importance of various items in inventory.

The A-B-C approach classifies inventory items according to some measure of impor- tance, usually annual dollar value (i.e., dollar value per unit multiplied by annual usage rate), and then allocates control efforts accordingly. Typically, three classes of items are used: A (very important), B (moderately important), and C (least important). However, the actual number of categories may vary from organization to organization, depending on the extent

Ordering costs  Costs of order- ing and receiving inventory.

Setup costs  The costs involved in preparing equipment for a job.

Shortage costs  Costs resulting when demand exceeds the sup- ply of inventory; often unreal- ized profit per unit.

LO13.7 Describe the A-B-C approach and explain how it is useful.

A-B-C approach  Classify- ing inventory according to some measure of importance, and allocating control efforts accordingly.

One way to lower inventory holding costs is to improve space utilization through narrow aisle handling equipment, mezzanines, layout, or other appropriate storage modes. Another is an inventory management system that allows companies to maintain tight control over inventory levels. This allows process planners to optimize material and maintain accurate quantities.

ste24102_ch13_546-603.indd 554ste24102_ch13_546-603.indd 554 11/14/13 10:56 AM11/14/13 10:56 AM

Final PDF to printer

Chapter Thirteen Inventory Management 555

to which a firm wants to differentiate control efforts. With three classes of items, A items generally account for about 10 to 20 percent of the number of items in inventory but about 60 to 70 percent of the annual dollar value. At the other end of the scale, C items might account for about 50 to 60 percent of the number of items but only about 10 to 15 percent of the dol- lar value of an inventory. These percentages vary from firm to firm, but in most instances a relatively small number of items will account for a large share of the value or cost associated with an inventory, and these items should receive a relatively greater share of control efforts. For instance, A items should receive close attention through frequent reviews of amounts on hand and control over withdrawals, where possible, to make sure that customer service levels are attained. The C items should receive only loose control (two-bin system, bulk orders), and the B items should have controls that lie between the two extremes.

Note that C items are not necessarily un important; incurring a stockout of C items such as the nuts and bolts used to assemble manufactured goods can result in a costly shutdown of an assem- bly line. However, due to the low annual dollar value of C items, there may not be much addi- tional cost incurred by ordering larger quantities of some items, or ordering them a bit earlier.

Figure 13.1 illustrates the A-B-C concept. To solve an A-B-C problem, follow these steps:

1. For each item, multiply annual volume by unit price to get the annual dollar value.

2. Arrange annual dollar values in descending order.

3. The few (10 to 15 percent) with the highest annual dollar value are A items. The most (about 50 percent) with the lowest annual dollar value are C items. Those in between (about 35 percent) are B items.

FIGURE 13.1 A typical A-B-C breakdown in relative annual dollar value of items and number of items by category

High

Percentage of items

Moderate

C items

A items

B items

Low

Moderate

Annual dollar value of items

High

Low

E X A M P L E 1

e celx mhhe.com/stevenson12e

A manager has obtained a list of unit costs and estimated annual demands for 10 inventory items and now wants to categorize the items on an A-B-C basis. Multiplying each item's annual demand by its unit cost yields its annual dollar value:

Item Number

Annual Demand (00)

� Unit Cost

� Annual Dollar Value (00)

1 25 $ 360 $ 9,000

2 10 70 700

3 24 500 12,000

4 15 100 1,500

5 7 70 490

6 10 1,000 10,000

7 2 210 420

8 10 4,000 40,000

9 80 10 800

10 5 200 1,000

75,910

ste24102_ch13_546-603.indd 555ste24102_ch13_546-603.indd 555 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

556 Chapter Thirteen Inventory Management

Although annual dollar value may be the primary factor in classifying inventory items, a manager may take other factors into account in making exceptions for certain items (e.g., changing the classification of a B item to an A item). Factors may include the risk of obsoles- cence, the risk of a stockout, the distance of a supplier, and so on.

Managers use the A-B-C concept in many different settings to improve operations. One key use occurs in customer service, where a manager can focus attention on the most important aspects of customer service by categorizing different aspects as very important, important, or of only minor importance. The point is to not overemphasize minor aspects of customer service at the expense of major aspects.

Another application of the A-B-C concept is as a guide to cycle counting , which is a physical count of items in inventory. The purpose of cycle counting is to reduce discrepancies between the amounts indicated by inventory records and the actual quantities of inventory on hand. Accu- racy is important because inaccurate records can lead to disruptions in operations, poor cus- tomer service, and unnecessarily high inventory carrying costs. The counts are conducted more frequently than once a year, which reduces the costs of inaccuracies compared to only doing an annual count, by allowing for investigation and correction of the causes of inaccuracies.

The key questions concerning cycle counting for management are

1. How much accuracy is needed?

2. When should cycle counting be performed?

3. Who should do it?

APICS recommends the following guidelines for inventory record accuracy: � .2 percent for A items, � 1 percent for B items, and � 5 percent for C items. A items are counted fre- quently, B items are counted less frequently, and C items are counted the least frequently.

Some companies use certain events to trigger cycle counting, whereas others do it on a periodic (scheduled) basis. Events that can trigger a physical count of inventory include an out-of-stock report written on an item indicated by inventory records to be in stock, an inven- tory report that indicates a low or zero balance of an item, and a specified level of activity (e.g., every 2,000 units sold).

Some companies use regular stockroom personnel to do cycle counting during periods of slow activity, while others contract with outside firms to do it on a periodic basis. Use of an outside firm provides an independent check on inventory and may reduce the risk of problems created by dishonest employees. Still other firms maintain full-time personnel to do cycle counting.

Cycle counting  A physical count of items in inventory.

S O L U T I O N Arranging the annual dollars values in descending order can facilitate assigning items to categories:

Item Number

Annual Dollar Value

Classification Percentage of Items

Percentage of Annual Dollar Value

8 $40,000 A 10 52.7

3 12,000 B

30 40.8 6 10,000 B

1 9,000 B

4 1,500 C

60 6.5

10 1,000 C

9 800 C

2 700 C

5 490 C

7 420 C

75,910 100 100

Note that category A has the fewest number of items but the highest percentage of annual dollar value, while category C has the most items but only a small percentage of the annual dollar value.

⎫ ⎬ ⎭

⎫ ⎬ ⎭

ste24102_ch13_546-603.indd 556ste24102_ch13_546-603.indd 556 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 557

13.4 INVENTORY ORDERING POLICIES Inventory ordering policies address the two basic issues of inventory management, which are how much to order and when to order. In the following sections, a number of models are described that are used for these issues.

Inventory that is intended to meet expected demand is known as cycle stock , while inven- tory that is held to reduce the probability of experiencing a stockout (i.e., running out of stock) due to demand and/or lead time variability is known as safety stock .

The discussion begins with the issue of how much to order.

13.5 HOW MUCH TO ORDER: ECONOMIC ORDER QUANTITY MODELS The question of how much to order can be determined by using an economic order quantity (EOQ) model. EOQ models identify the optimal order quantity by minimizing the sum of certain annual costs that vary with order size and order frequency. Three order size models are described here:

1. The basic economic order quantity model.

2. The economic production quantity model.

3. The quantity discount model.

Basic Economic Order Quantity (EOQ) Model The basic EOQ model is the simplest of the three models. It is used to identify a fixed order size that will minimize the sum of the annual costs of holding inventory and ordering inven- tory. The unit purchase price of items in inventory is not generally included in the total cost because the unit cost is unaffected by the order size unless quantity discounts are a factor. If holding costs are specified as a percentage of unit cost, then unit cost is indirectly included in the total cost as a part of holding costs.

The basic model involves a number of assumptions. They are listed in Table 13.1 . Inventory ordering and usage occur in cycles. Figure  13.2 illustrates several inventory

cycles. A cycle begins with receipt of an order of Q units, which are withdrawn at a constant rate over time. When the quantity on hand is just sufficient to satisfy demand during lead time, an order for Q units is submitted to the supplier. Because it is assumed that both the usage rate and the lead time do not vary, the order will be received at the precise instant that the inventory on hand falls to zero. Thus, orders are timed to avoid both excess stock and stockouts.

The optimal order quantity reflects a balance between carrying costs and ordering costs: As order size varies, one type of cost will increase while the other decreases. For example, if the order size is relatively small, the average inventory will be low, resulting in low carrying costs. However, a small order size will necessitate frequent orders, which will drive up annual ordering costs. Conversely, ordering large quantities at infrequent intervals can hold down annual ordering costs, but that would result in higher average inventory levels and therefore increased carrying costs. Figure 13.3 illustrates these two extremes.

Cycle stock  The amount of inventory needed to meet expected demand.

Safety stock  Extra inventory carried to reduce the probability of a stockout due to demand and/ or lead time variability.

Economic order quantity (EOQ)  The order size that minimizes total annual cost.

SCREENCAM TUTORIAL

LO13.8 Describe the basic EOQ model and its assumptions and solve typical problems.

1. Only one product is involved. 2. Annual demand requirements are known. 3. Demand is spread evenly throughout the year so that the demand rate is reasonably constant. 4. Lead time is known and constant. 5. Each order is received in a single delivery. 6. There are no quantity discounts.

TABLE 13.1 Assumptions of the basic EOQ model

ste24102_ch13_546-603.indd 557ste24102_ch13_546-603.indd 557 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

558 Chapter Thirteen Inventory Management

Thus, the ideal solution is an order size that causes neither a few very large orders nor many small orders, but one that lies somewhere between. The exact amount to order will depend on the relative magnitudes of carrying and ordering costs.

Annual carrying cost is computed by multiplying the average amount of inventory on hand by the cost to carry one unit for one year, even though any given unit would not necessarily be held for a year. The average inventory is simply half of the order quantity: The amount on hand decreases steadily from Q units to 0, for an average of ( Q   �  0)/2, or Q /2. Using the

FIGURE 13.2 The inventory cycle: profile of inventory level over time

Reorder point = 100 units

Receive order

Place order

Receive order

Place order

Receive order

Day

Lead time = 2 days

Quantity on hand

Q = 350 units

Usage rate = 50 units per day

Order size, Q = 350 units Usage rate = 50 units per day Lead time = 2 days Reorder point = 100 units (2 days’ supply)

0 5 7 12 14

FIGURE 13.3 Average inventory level and number of orders per year are inversely related: As one increases, the other decreases Average

inventory

0

Q

Q/2

Q/2

Many orders produce a low average inventory.

1 year

1 year

Time

Average inventory

0

Q

Few orders produce a high average inventory. Time

ste24102_ch13_546-603.indd 558ste24102_ch13_546-603.indd 558 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 559

symbol H to represent the average annual carrying cost per unit, the total annual carrying cost is

Annual carrying cost

2

Q H�

where

Q   �  Order quantity in units

H   �  Holding (carrying) cost per unit per year

Carrying cost is thus a linear function of Q: Carrying costs increase or decrease in direct proportion to changes in the order quantity Q, as Figure 13.4A illustrates.

On the other hand, annual ordering cost will decrease as order size increases because, for a given annual demand, the larger the order size, the fewer the number of orders needed. For instance, if annual demand is 12,000 units and the order size is 1,000 units per order, there must be 12 orders over the year. But if Q   �  2,000 units, only six orders will be needed; if Q   �  3,000 units, only four orders will be needed. In general, the number of orders per year will be D/Q, where D   �  Annual demand and Q   �  Order size. Unlike carrying costs, order- ing costs are relatively insensitive to order size; regardless of the amount of an order, certain activities must be done, such as determining how much is needed, periodically evaluating sources of supply, and preparing the invoice. Even inspection of the shipment to verify qual- ity and quantity characteristics is not strongly influenced by order size since large shipments are sampled rather than completely inspected. Hence, ordering cost is treated as a constant. Annual ordering cost is a function of the number of orders per year and the ordering cost per order:

Annual ordering cost

D

Q S�

where

D   �  Demand, usually in units per year

S   �  Ordering cost per order

Because the number of orders per year, D/Q, decreases as Q increases, annual ordering cost is inversely related to order size, as Figure 13.4B illustrates.

The total annual cost (TC) associated with carrying and ordering inventory when Q units are ordered each time is

TC Annual carrying

cost

Annual ordering

cost 2

Q H

D

Q S� � � �

(13–1)

FIGURE 13.4 Carrying cost, ordering cost, and total cost curve

Order quantity

A n

n u

al c

o st

Order quantity

A n

n u

al c

o st

Order quantity

A n

n u

al c

o stQ

2 H

D Q

S Q 2

H D Q

STC = +

Q 0

A. Carrying costs are linearly related to order size.

B. Ordering costs are inversely and nonlinearly related to order size.

C. The total-cost curve is U-shaped.

ste24102_ch13_546-603.indd 559ste24102_ch13_546-603.indd 559 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

560 Chapter Thirteen Inventory Management

(Note that D and H must be in the same units, e.g., months, years.) Figure 13.4C reveals that the total-cost curve is U-shaped (i.e., convex, with one minimum) and that it reaches its minimum at the quantity where carrying and ordering costs are equal. An expression for the optimal order quantity, Q 0 , can be obtained using calculus.

1 The result is the formula

2 0Q

DS

H �

(13–2)

Thus, given annual demand, the ordering cost per order, and the annual carrying cost per unit, one can compute the optimal (economic) order quantity. The minimum total cost is then found by substituting Q 0 for Q in Formula 13–1.

The length of an order cycle (i.e., the time between orders) is

Length of order cycle

Q

D �

(13–3)

1 We can find the minimum point of the total-cost curve by differentiating TC with respect to Q, setting the result equal to zero, and solving for Q. Thus,

1. d

dQ H DS Q� �

TC /2 / 2

2. 0 /2 / , so 2

and 22 2H DS Q Q

DS

H Q

DS

H � � � �

Note that the second derivative is positive, which indicates a minimum has been obtained.

E X A M P L E 2

e celx mhhe.com/stevenson12e

S O L U T I O N

A local distributor for a national tire company expects to sell approximately 9,600 steel-belted radial tires of a certain size and tread design next year. Annual carrying cost is $16 per tire, and ordering cost is $75. The distributor operates 288 days a year.

a. What is the EOQ?

b. How many times per year does the store reorder?

c. What is the length of an order cycle?

d. What is the total annual cost if the EOQ quantity is ordered?

D

H

S

9,600 tires per year

$16 per unit per year

$75

a. 2 2(9,600)75

16 300 tires.0Q

DS

H � � �

b. Number of orders per year: / 9,600 tires/year

300 tires/order 32 orders.D Q � �

c. Length of order cycle: / 300 tires

9,600 tires/year of a year, which is 288,132 132Q D � � �

or nine workdays.

d.

Q H D Q S

� �

� �

� �

� �

TC Carrying cost Ordering co

( /2) ( / )

(300/2)16 (9,600/300)75

$2,400 $2,400

$4,800

Note that the ordering and carrying costs are equal at the EOQ, as illustrated in Figure 13.4C .

ste24102_ch13_546-603.indd 560ste24102_ch13_546-603.indd 560 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 561

Carrying cost is sometimes stated as a percentage of the price of an item rather than as a dollar amount per unit. However, as long as the percentage is converted into a dollar amount, the EOQ formula is still appropriate.

D

S

H

Q DS

H

Q H D Q S

3,600 security cameras per year

$50

.20($180) $36

2 2(3,600)(50)

36 100 security cameras

TC Carrying costs Ordering costs

( /2)   ( / )

(100/2)36 (3,600/100)50

$1,800 $1,800 $3,600

0

0 0

� �

� � �

� �

� �

� �

� � �

E X A M P L E 3

e celx mhhe.com/stevenson12e

S O L U T I O N

Piddling Manufacturing assembles security systems. It purchases 3,600 high-definition security cameras a year at $180 each. Ordering costs are $50, and annual carrying costs are 20  percent of the purchase price. Compute the optimal quantity and the total annual cost of ordering and carrying the inventory.

Comment Holding and ordering costs, and annual demand, are typically estimated values rather than values that can be precisely determined, say, from accounting records. Holding costs are sometimes designated by management rather than computed. Consequently, the EOQ should be regarded as an approximate quantity rather than an exact quantity. Thus, rounding the calculated value (to a whole number) is perfectly acceptable; stating a value to several decimal places would tend to give an unrealistic impression of the precision involved. An obvious question is: How good is this “approximate” EOQ in terms of minimizing cost? The answer is that the EOQ is fairly robust; the total cost curve is relatively flat near the EOQ, especially to the right of the EOQ. In other words, even if the order quantity differs from the actual EOQ, total costs will not increase much at all. This is particularly true for quantities larger than the real EOQ, because the total cost curve rises very slowly to the right of the EOQ. (See Figure 13.5 .)

Because the total cost curve is relatively flat around the EOQ, there can be some flexibility to modify the order quantity a bit from the EOQ (say, to achieve a round lot or full truckload) without incurring much of an increase in total cost.

Economic Production Quantity (EPQ) The batch mode is widely used in production. Even in assembly operations, portions of the work are done in batches. The reason for this is that in certain instances, the capacity to produce a part exceeds the part's usage or demand rate. As long as production continues,

FIGURE 13.5 The total cost curve is relatively flat near the EOQ

Order quantity

R an

g e

o f

T C

Q 0 EOQ “zone”

0

TC

Total cost

ste24102_ch13_546-603.indd 561ste24102_ch13_546-603.indd 561 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

562 Chapter Thirteen Inventory Management

inventory will continue to grow. In such instances, it makes sense to periodically produce such items in batches, or lots, instead of producing continually.

The assumptions of the EPQ model are similar to those of the EOQ model, except that instead of orders received in a single delivery, units are received incrementally during produc- tion. The assumptions are

1. Only one product is involved.

2. Annual demand is known.

3. The usage rate is constant.

4. Usage occurs continually, but production occurs periodically.

5. The production rate is constant when production is occurring.

6. Lead time is known and constant.

7. There are no quantity discounts.

Figure 13.6 illustrates how inventory is affected by periodically producing a batch of a particular item.

During the production phase of the cycle, inventory builds up at a rate equal to the difference between production and usage rates. For example, if the daily production rate is 20 units and the daily usage rate is 5 units, inventory will build up at the rate of 20  �  5  �  15 units per day. As long as production occurs, the inventory level will continue to build; when production ceases, the inventory level will begin to decrease. Hence, the inventory level will be maximum at the point where production ceases. Inventory will then decrease at the constant usage rate. When the amount of inventory on hand is exhausted, production is resumed, and the cycle repeats itself.

Because the company makes the product itself, there are no ordering costs as such. None- theless, with every production run (batch) there are setup costs—the costs required to prepare the equipment for the job, such as cleaning, adjusting, and changing tools and fixtures. Setup costs are analogous to ordering costs because they are independent of the lot (run) size. They are treated in the formula in exactly the same way. The larger the run size, the fewer the num- ber of runs needed and, hence, the lower the annual setup cost. The number of runs or batches per year is D/Q, and the annual setup cost is equal to the number of runs per year times the setup cost, S, per run: ( D/Q ) S.

The total cost is

TC Carrying cost Setup cost 2

( / )min maxI H D Q S� � � �⎛⎝

⎞ ⎠ (13–4)

where

I max   �  Maximum inventory

Unlike the EOQ case, where the entire quantity, Q, goes into inventory, in this case usage continually draws off some of the output, and what's left goes into inventory. So the inventory level will never be at the run size, Q0. You can see that in Figure 13.6 .

SCREENCAM TUTORIAL

LO13.9 Describe the economic production quantity model and solve typical problems.

FIGURE 13.6 EPQ with incremental inventory buildup

Time

Run size, Q 0

Q

Maximum inventory, Imax

Production and usage

Production and usage

Production and usage

Usage only

Usage only

Usage only

Cumulative production

Inventory

ste24102_ch13_546-603.indd 562ste24102_ch13_546-603.indd 562 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 563

The economic run quantity is

2

Q DS

H

p

p u p �

� (13–5)

where

p   �  Production or delivery rate

u   �  Usage rate

Note: p and u must be in the same units (e.g., both in units per day, or units per week). The cycle time (the time between setups of consecutive runs) for the economic run size

model is a function of the run size and usage (demand) rate:

Cycle time Q

u p

� (13–6)

Similarly, the run time (the production phase of the cycle) is a function of the run (lot) size and the production rate:

Run time Q

p p

� (13–7)

The maximum and average inventory levels are

( ) or and 2

max average max

� � � � ⎛ ⎝⎜

⎞ ⎠⎟I

Q

p p u Q

Q

P u I

Ip p

p (13–8)

E X A M P L E 4

e celx mhhe.com/stevenson12e

S O L U T I O N

D

S

H

p

u

48,000 wheels per year

$45

$1 per wheel per year

800 wheels per day

48,000 wheels per 240 days, or 200 wheels per day

a. 2 2(48,000)45

1

800

800 200 2,400 wheelsQ

DS

H

p

p u p �

� �

� �

b. TC Carrying cost Setup cost 2

( / )min maxI H D Q Sp� � � �

⎛ ⎝

⎞ ⎠

Thus, first compute I max :

( ) 2,400

800 (800 200) 1,800 wheels

TC 1,800

2 $1

48,000

2,400 $45 $900 $900 $1,800

maxI Q

p p u

p � � � � �

� � � � � � �

A toy manufacturer uses 48,000 rubber wheels per year for its popular dump truck series. The firm makes its own wheels, which it can produce at a rate of 800 per day. The toy trucks are assembled uniformly over the entire year. Carrying cost is $1 per wheel a year. Setup cost for a production run of wheels is $45. The firm operates 240 days per year. Determine the

a. Optimal run size.

b. Minimum total annual cost for carrying and setup.

c. Cycle time for the optimal run size.

d. Run time.

ste24102_ch13_546-603.indd 563ste24102_ch13_546-603.indd 563 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

564 Chapter Thirteen Inventory Management

Quantity Discounts Quantity discounts are price reductions for larger orders offered to customers to induce them to buy in large quantities. For example, a Chicago surgical supply company publishes the price list shown in Table 13.2 for boxes of gauze strips. Notice how the price per box decreases as order quantity increases.

When quantity discounts are available, there are a number of questions that must be addressed to decide whether to take advantage of a discount. These include:

1. Will storage space be available for the additional items?

2. Will obsolescence or deterioration be an issue?

3. Can we afford to tie up extra funds in inventory?

If the decision is made to take advantage of a quantity discount, the goal is to select the order quantity that will minimize total cost, where total cost is the sum of carrying cost, order- ing cost, and purchasing (i.e., product) cost:

⎛ ⎝⎜

⎞ ⎠⎟

⎛ ⎝⎜

⎞ ⎠⎟

Q H

D

Q S PD

� � �

� � �

TC Carrying cost Ordering cost Purchasing cost

2

(13–9)

Where

Q   �  Order quantity

H   �  Holding cost per unit (usually annual)

D   �  Demand (usually annual)

S   �  Ordering cost

P   �  Unit price or cost

Recall that in the basic EOQ model, determination of order size does not involve the pur- chasing cost. The rationale for not including unit price is that under the assumption of no quantity discounts, price per unit is the same for all order sizes. Inclusion of unit price in the total-cost computation in that case would merely increase the total cost by the amount P times D. A graph of total annual purchase cost versus quantity would be a horizontal line. Hence, including purchasing costs would merely raise the total-cost curve by the same amount ( PD ) at every point. That would not change the EOQ. (See Figure 13.7 .)

When quantity discounts are offered, there is a separate U-shaped total-cost curve for each unit price. Again, including unit prices merely raises each curve by a constant amount. How- ever, because the unit prices are all different, each curve is raised by a different amount: Smaller unit prices will raise a total-cost curve less than larger unit prices. Note that no one curve applies to the entire range of quantities; each curve applies to only a portion of the range. (See Figure 13.8 .) Hence, the applicable or feasible total cost is initially on the curve with the highest unit price and then drops down, curve by curve, at the price breaks, which are the minimum quantities needed to obtain the discounts. Thus, in Table 13.2 , the price breaks for gauze strips are at 45 and 70 boxes. The result is a total-cost curve with steps at the price breaks.

Quantity discounts  Price reductions for larger orders.

LO13.10 Describe the quantity discount model and solve typi- cal problems.

Note again the equality of cost (in this example, setup and carrying costs) at the EOQ.

c. Cycle time 2,400 wheels

200 wheels per day 12 days

Q

u p

� � �

Thus, a run of wheels will be made every 12 days.

d. Run time 2,400 wheels

800 wheels per day 3 days

Q

p p

� � �

Thus, each run will require three days to complete.

ste24102_ch13_546-603.indd 564ste24102_ch13_546-603.indd 564 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 565

Even though each curve has a minimum, those points are not necessarily feasible. For exam- ple, the minimum point for the $1.40 curve in Figure 13.8 appears to be about 65 units. How- ever, the price list shown in Table 13.2 indicates that an order size of 65 boxes will involve a unit price of $1.70. The actual total-cost curve is denoted by the solid lines; only those price–quan- tity combinations are feasible. The objective of the quantity discount model is to identify the order quantity that will represent the lowest total cost for the entire set of curves.

Analysis of quantity discount problems differs slightly, depending on whether holding costs are independent of unit price (i.e., constant), or whether they are a percentage of unit price. The following table illustrates the two ways, using 20 percent to illustrate holding costs that are a percentage of unit price.

When carrying costs are constant, there will be a single minimum point. All curves will have their minimum point at the same quantity. Consequently, the total-cost curves line up vertically, differing only in that the lower unit prices are reflected by lower total-cost curves as shown in Figure 13.9A . (For purposes of illustration, the horizontal purchasing cost lines have been omitted.)

When carrying costs are specified as a percentage of unit price, each curve will have a different minimum point. Because carrying costs are a percentage of price, lower prices will mean lower carrying costs and larger minimum points. Thus, as price decreases, each curve's minimum point will be to the right of the next higher curve's minimum point. (See Figure 13.9B .)

Order Quantity Price per Box

1 to 44 $2.00 45 to 69 1.70 70 or more 1.40

TABLE 13.2 Price list for extra-wide gauze strips

FIGURE 13.7 Adding PD doesn't change the EOQ

Quantity

Cost

EOQ

PD

TC without PD

TC with PD

0

FIGURE 13.8 The total-cost curve with quantity discounts is composed of a portion of the total-cost curve for each price

Quantity

Cost

45

PD @ $2.00 each

0

PD @ $1.70 each PD @ $1.40

each

70

TC @ $1.40 each

TC @ $1.70 each

TC @ $2.00 each

Order Quantity Unit Price H constant @ $4 H 20% of Unit Price

1 to 99 $10 4 .20(10)  �  2.00 100 to 299 9 4 .20 (9)  �  1.80

300 or more 8 4 .20 (8)  �  1.60

ste24102_ch13_546-603.indd 565ste24102_ch13_546-603.indd 565 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

566 Chapter Thirteen Inventory Management

The procedure for determining the overall EOQ differs slightly, depending on which of these two cases is relevant. For carrying costs that are constant, the procedure is as follows:

1. Compute the common minimum point.

2. Only one of the unit prices will have the minimum point in its feasible range since the ranges do not overlap. Identify that range.

a. If the feasible minimum point is on the lowest price range (i.e., the lowest cost curve), that is the optimal order quantity.

b. If the feasible minimum point is in any other range, compute the total cost for the feasible minimum point and for the price breaks of all lower unit costs. Compare the total costs; the quantity (minimum point or price break) that yields the lowest total cost is the optimal order quantity.

FIGURE 13.9 Comparison of TC curves for constant carrying costs and carrying costs that are a percentage of unit costs

Quantity

Cost

TCb

TCa

TCc

CCa, b, c

OC

Decreasing price

EOQ0

Cost

Quantity

TCb

TCa

TCc

CCa

OC

CCb

CCc

A. When carrying costs are constant, all curves have their minimum points at the same quantity.

B. When carrying costs are stated as a percentage of unit price, the minimum points do not line up.

E X A M P L E 5

e celx mhhe.com/stevenson12e

S O L U T I O N

The maintenance department of a large hospital uses about 816 cases of liquid cleanser annu- ally. Ordering costs are $12, carrying costs are $4 per case a year, and the new price schedule indicates that orders of less than 50 cases will cost $20 per case, 50 to 79 cases will cost $18 per case, 80 to 99 cases will cost $17 per case, and larger orders will cost $16 per case. Deter- mine the optimal order quantity and the total cost.

See Figure 13.10 :

816 cases per year $12 $4 per case per yearD S H� � �

Range Price

1 to 49 $20

50 to 79 18

80 to 99 17

100 or more 16

1. Compute the common minimum Q: 2 2(816)12

4 69.97 70 cases

DS

H � � � � .

ste24102_ch13_546-603.indd 566ste24102_ch13_546-603.indd 566 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 567

When carrying costs are expressed as a percentage of price, determine the best purchase quantity with the following procedure:

1. Beginning with the lowest unit price, compute the minimum points for each price range until you find a feasible minimum point (i.e., until a minimum point falls in the quantity range for its price).

2. If the minimum point for the lowest unit price is feasible, it is the optimal order quan- tity. If the minimum point is not feasible in the lowest price range, compare the total cost at the price break for all lower price ranges with the total cost of the feasible mini- mum point. The quantity that yields the lowest total cost is the optimum.

FIGURE 13.10 Total-cost curves for Example 5

Quantity

Cost

500 70 80 100

$16/case

$17/case

$18/case

$20/case

2. The 70 cases can be bought at $18 per case because 70 falls in the range of 50 to 79 cases. The total cost to purchase 816 cases a year, at the rate of 70 cases per order, will be

Q H D Q S PD

� � �

� � �

� � � �

TC Carrying cost Order cost Purchase cost

( /2) ( / )

(70/2)4 (816/70)12 18(816) $14,968

70

Because lower cost ranges exist, each must be checked against the minimum cost generated by 70 cases at $18 each. In order to buy at $17 per case, at least 80 cases must be purchased. (Because the TC curve is rising, 80 cases will have the lowest TC for that curve's feasible region.) The total cost at 80 cases will be

TC (80/2)4 (816/80)12 17(816) $14,15480 � � � �

To obtain a cost of $16 per case, at least 100 cases per order are required, and the total cost at that price break will be

TC (100/2)4 (816/100)12 16(816) $13,354100 � � � �

Therefore, because 100 cases per order yields the lowest total cost, 100 cases is the overall optimal order quantity.

E X A M P L E 6

e celx mhhe.com/stevenson12e

Surge Electric uses 4,000 toggle switches a year. Switches are priced as follows: 1 to 499, 90 cents each; 500 to 999, 85 cents each; and 1,000 or more, 80 cents each. It costs approximately $30 to prepare an order and receive it, and carrying costs are 40 percent of purchase price per unit on an annual basis. Determine the optimal order quantity and the total annual cost.

ste24102_ch13_546-603.indd 567ste24102_ch13_546-603.indd 567 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

568 Chapter Thirteen Inventory Management

S O L U T I O N See Figure 13.11 :

4,000 switches per year $30 .40D S H P� � �

Range Unit Price H

1 to 499 $.90 .40(.90)  �  .36

500 to 999 $.85 .40(.85)  �  .34

1,000 or more $.80 .40(.80)  �  .32

Find the minimum point for each price, starting with the lowest price, until you locate a fea- sible minimum point.

Minimum point

2 2(4,000)30

.32 866 switches.80

DS

H � � �

Because an order size of 866 switches will cost $.85 each rather than $.80 each, 866 is not a feasible minimum point for $.80 per switch. Next, try $.85 per unit.

Minimum point

2(4,000)30

.34 840 switches.85 � �

This is feasible; it falls in the $.85 per switch range of 500 to 999. Now compute the total cost for 840, and compare it to the total cost of the minimum quan-

tity necessary to obtain a price of $.80 per switch.

⎛ ⎝⎜

⎞ ⎠⎟

⎛ ⎝⎜

⎞ ⎠⎟

Q H

D

Q S PD

� � �

� � �

� � � �

� � � �

TC Carrying costs Ordering costs Purchasing costs

2

TC 840

2 (.34)

4,000

840 (30) .85(4,000) $3,686

TC 1,000

2 (.32)

4,000

1,000 (30) .80(4,000) $3,480

840

1,000

Thus, the minimum-cost order size is 1,000 switches.

FIGURE 13.11 Total-cost curves for Example 6

Quantity

Cost

5000 840 866

TC @ $.90 ea.

TC @ $.85 ea.

TC @ $.80 ea.

1,000

ste24102_ch13_546-603.indd 568ste24102_ch13_546-603.indd 568 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 569

13.6 REORDER POINT ORDERING EOQ models answer the question of how much to order, but not the question of when to order. The latter is the function of models that identify the reorder point (ROP) in terms of a quantity: The reorder point occurs when the quantity on hand drops to a predetermined amount. That amount generally includes expected demand during lead time and perhaps an extra cushion of stock, which serves to reduce the probability of experiencing a stockout dur- ing lead time. Note that in order to know when the reorder point has been reached, perpetual inventory monitoring is required.

The goal in ordering is to place an order when the amount of inventory on hand is suffi- cient to satisfy demand during the time it takes to receive that order (i.e., lead time). There are four determinants of the reorder point quantity:

1. The rate of demand (usually based on a forecast).

2. The lead time.

3. The extent of demand and/or lead time variability.

4. The degree of stockout risk acceptable to management.

If demand and lead time are both constant, the reorder point is simply

ROP LTd� � (13–10)

where

d   �  Demand rate (units per day or week)

LT  �  Lead time in days or weeks

Note: Demand and lead time must be expressed in the same time units.

Reorder point (ROP)  When the quantity on hand of an item drops to this amount, the item is reordered.

SCREENCAM TUTORIAL

LO13.11 Describe reorder point models and solve typical problems.

E X A M P L E 7

e celx mhhe.com/stevenson12e

S O L U T I O N

Tingly takes Two-a-Day vitamins, which are delivered to his home by a routeman seven days after an order is called in. At what point should Tingly reorder?

� �

� � �

Usage

Lead time

ROP

2 vitamins a day

7 days

Usage Lead time

2 vitamins per day 7 days 14 vitamins

Thus, Tingly should reorder when 14 vitamin tablets are left, which is equal to a seven-day supply of two vitamins a day.

When variability is present in demand or lead time, it creates the possibility that actual demand will exceed expected (average) demand. Consequently, it becomes necessary to carry additional inventory, called safety stock , to reduce the risk of running out of inventory (a stockout) during lead time. The reorder point then increases by the amount of the safety stock:

ROP Expected demand during lead time Safety stock� � (13–11)

For example, if expected demand during lead time is 100 units, and the desired amount of safety stock is 10 units, the ROP would be 110 units.

Figure 13.12 illustrates how safety stock can reduce the risk of a stockout during lead time (LT). Note that stockout protection is needed only during lead time. If there is a sudden surge at any point during the cycle, that will trigger another order. Once that order is received, the danger of an imminent stockout is negligible.

Safety stock  Stock that is held in excess of expected demand due to variable demand and/or lead time.

ste24102_ch13_546-603.indd 569ste24102_ch13_546-603.indd 569 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

570 Chapter Thirteen Inventory Management

Because it costs money to hold safety stock, a manager must carefully weigh the cost of carrying safety stock against the reduction in stockout risk it provides. The customer service level increases as the risk of stockout decreases. Order cycle service level can be defined as the probability that demand will not exceed supply during lead time (i.e., that the amount of stock on hand will be sufficient to meet demand). Hence, a service level of 95 percent implies a probability of 95 percent that demand will not exceed supply during lead time. An equiva- lent statement that demand will be satisfied in 95 percent of such instances does not mean that 95 percent of demand will be satisfied. The risk of a stockout is the complement of service level; a customer service level of 95 percent implies a stockout risk of 5 percent. That is,

Service level 100 percent Stockout risk� �

Later you will see how the order cycle service level relates to the annual service level. Consider for a moment the importance of stockouts. When a stockout occurs, demand

cannot be satisfied at that time. In manufacturing operations, stockouts mean that jobs will be delayed and additional costs will be incurred. If the stockout involves parts for an assembly line, or spare parts for a machine or conveyor belt on the line, the line will have to shut down, typically at a very high cost per hour, until parts can be obtained. For service operations, stockouts mean that services cannot be completed on time. Aside from the added cost that results from the time delay, there is not only the matter of customer dissatisfaction but also the fact that schedules will be disrupted, sometimes creating a “domino effect” on following jobs. In the retail sector, stockouts create a competitive disadvantage that can result in customer dissatisfaction and, ultimately, the loss of customers.

The amount of safety stock that is appropriate for a given situation depends on the follow- ing factors:

1. The average demand rate and average lead time.

2. Demand and lead time variability.

3. The desired service level.

For a given order cycle service level, the greater the variability in either demand rate or lead time, the greater the amount of safety stock that will be needed to achieve that service level. Similarly, for a given amount of variation in demand rate or lead time, achieving an increase in the service level will require increasing the amount of safety stock. Selection of a service level

Service level  Probability that demand will not exceed supply during lead time.

FIGURE 13.12 Safety stock reduces risk of stockout during lead time

Time

Qu an

tit y

LT

Place order

Receive order

Maximum probable demand during lead time

Expected demand during lead time

ROP

Safety stock

ste24102_ch13_546-603.indd 570ste24102_ch13_546-603.indd 570 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 571

may reflect stockout costs (e.g., lost sales, customer dissatisfaction) or it might simply be a policy variable (e.g., the manager wants to achieve a specified service level for a certain item).

Let us look at several models that can be used in cases when variability is present. The first model can be used if an estimate of expected demand during lead time and its standard devia- tion are available. The formula is

ROP Expected demand during lead time LTz d� � � (13–12)

where

z   �  Number of standard deviations

s d LT   �  The standard deviation of lead time demand

The models generally assume that any variability in demand rate or lead time can be ade- quately described by a normal distribution. However, this is not a strict requirement; the mod- els provide approximate reorder points even where actual distributions depart from normal.

The value of z (see Figure 13.13 ) used in a particular instance depends on the stockout risk that the manager is willing to accept. Generally, the smaller the risk the manager is willing to accept, the greater the value of z. Use Appendix B, Table B, to obtain the value of z, given a desired service level for lead time.

FIGURE 13.13 The ROP based on a normal distribution of lead time demand

Expected demand

ROP

0 z

Quantity

Service level Risk of a stockout

(Probability of no stockout)

Safety stock

z scale

E X A M P L E 8

e celx mhhe.com/stevenson12e

Suppose that the manager of a construction supply house determined from historical records that demand for sand during lead time averages 50 tons. In addition, suppose the manager determined that demand during lead time could be described by a normal distribution that has a mean of 50 tons and a standard deviation of 5 tons. Answer these questions, assuming that the manager is willing to accept a stockout risk of no more than 3 percent:

a. What value of z is appropriate?

b. How much safety stock should be held?

c. What reorder point should be used?

S O L U T I O N Expected lead time demand � 50 tons

d� �

�Risk

5 tons

3 percent

LT

a. From Appendix B, Table B, using a service level of 1  �  .03 � .9700, you obtain a value of z   �   � 1.88.

b. Safety stock  �   z � d LT   �  1.88(5)  �  9.40 tons.

c. ROP  �  Expected lead time demand  �  Safety stock  �  50  �  9.40  �  59.40 tons.

ste24102_ch13_546-603.indd 571ste24102_ch13_546-603.indd 571 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

572 Chapter Thirteen Inventory Management

When data on lead time demand are not readily available, Formula 13–12 cannot be used. Nevertheless, data are generally available on daily or weekly demand, and on the length of lead time. Using those data, a manager can determine whether demand and/or lead time is variable, if variability exists in one or both, and the related standard deviation(s). For those situations, one of the following formulas can be used:

If only demand is variable, then LT,LTd d� � � and the reorder point is

ROP LT LTd z d� � � � (13–13)

where

d Average� daily or weekly demand

� d   �  Standard deviation of demand in days or weeks

LT  �  Lead time in days or weeks

If only lead time is variable, then � d LT   �   d � LT , and the reorder point is

ROP LT LTd zd� � � � (13–14)

where

d   �  Daily or weekly demand

LT Average� lead time in days or weeks

� LT   �  Standard deviation of lead time in days or weeks

If both demand and lead time are variable, then

LTLT 2

2 LT 2� � � �+ dd d

and the reorder point is

ROP LT LT 2 2

LT 2d z dd� � � � �+ (13–15)

Note: Each of these models assumes that demand and lead time are independent.

E X A M P L E 9

e celx mhhe.com/stevenson12e

S O L U T I O N

A restaurant uses an average of 50 jars of a special sauce each week. Weekly usage of sauce has a standard deviation of 3 jars. The manager is willing to accept no more than a 10 percent risk of stockout during lead time, which is two weeks. Assume the distribution of usage is normal.

a. Which of the above formulas is appropriate for this situation? Why?

b. Determine the value of z.

c. Determine the ROP.

d d

� � �

� �

50 jars per week 3 jars per week

LT 2 weeks Acceptable risk 10 percent, so service level is .90

a. Because only demand is variable (i.e., has a standard deviation), Formula 13–13 is

appropriate.

b. From Appendix B, Table B, using a service level of .9000, you obtain z   �   � 1.28.

c. ROP LT LT 50 2 1.28(3) 2 100 5.43 105.43.d z d� � � � � � � � � �

d. Because the inventory is discrete units (jars), we round this amount to 106. (Generally, round up.)

ste24102_ch13_546-603.indd 572ste24102_ch13_546-603.indd 572 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 573

Note that a two-bin ordering system (see p. 552) involves ROP reordering: The quantity in the second bin is equal to the ROP.

The logic of the three formulas for the reorder point may not be immediately obvious. The first part of each formula is the expected demand, which is the product of daily (or weekly) demand and the number of days (or weeks) of lead time. The second part of the formula is z times the standard deviation of lead time demand. For the formula in which only demand is variable, daily (or weekly) demand is assumed to be normally distributed and has the same mean and standard deviation (see Figure 13.14 ). The standard deviation of demand for the entire lead time is found by summing the variances of daily (or weekly) demands, and then finding the square root of that number because, unlike variances, standard deviations are not additive. Hence, if the daily standard deviation is � d , the variance is �

2 d , and if lead time is

four days, the variance of lead time demand will equal the sum of the four variances, which is 4�

2 d . The standard deviation of lead time demand will be the square root of this, which is

equal to 2 � d . In general, this becomes LT d� and, hence, the last part of Formula 13–13. When only lead time is variable, the explanation is much simpler. The standard deviation

of lead time demand is equal to the constant daily demand multiplied by the standard devia- tion of lead time.

When both demand and lead time are variable, the formula appears truly impressive. How- ever, it is merely the result of squaring the standard deviations of the two previous formulas to obtain their variances, summing them, and then taking the square root.

It is sometimes convenient to think of service level in annual terms. One definition of annual service level is the percentage of demand filled directly from inventory. This is also known as the fill rate . Thus, if D   �  1,000, and 990 units were filled directly from inventory (shortages totaling 10 units over the year were recorded), the annual service level (fill rate) would be 990/1,000  �  99 percent.

13.7 HOW MUCH TO ORDER: FIXED-ORDER- INTERVAL MODEL The fixed-order-interval (FOI) model is used when orders must be placed at fixed time intervals (weekly, twice a month, etc.): The timing of orders is set. The question, then, at each order point, is how much to order. Fixed-interval ordering systems are widely used by retail businesses. If demand is variable, the order size will tend to vary from cycle to cycle. This is quite different from an EOQ/ROP approach in which the order size generally remains fixed from cycle to cycle, while the length of the cycle varies (shorter if demand is above average, and longer if demand is below average).

Fill rate  The percentage of demand filled by the stock on hand.

Fixed-order-interval (FOI) model  Orders are placed at fixed time intervals.

FIGURE 13.14 Lead time demand

Q0 + ss

ROP

ss

0

Inventory on hand

Distributions of daily demand

Lead time Risk

Service level

Distribution of lead time demand

Safety stock (ss)

ste24102_ch13_546-603.indd 573ste24102_ch13_546-603.indd 573 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

574 Chapter Thirteen Inventory Management

Reasons for Using the Fixed-Order-Interval Model In some cases, a supplier's policy might encourage orders at fixed intervals. Even when that is not the case, grouping orders for items from the same supplier can produce savings in ship- ping costs. Furthermore, some situations do not readily lend themselves to continuous moni- toring of inventory levels. Many retail operations (e.g., drugstores, small grocery stores) fall into this category. The alternative for them is to use fixed-interval ordering, which requires only periodic checks of inventory levels.

Determining the Amount to Order If both the demand rate and lead time are constant, the fixed-interval model and the fixed- quantity model function identically. The differences in the two models become apparent only when examined under conditions of variability. Like the ROP model, the fixed-interval model can have variations in demand only, in lead time only, or in both demand and lead time. How- ever, for the sake of simplicity and because it is perhaps the most frequently encountered situ- ation, the discussion here will focus only on variable demand and constant lead time.

Figure 13.15 provides a comparison of the fixed-quantity and fixed-interval systems. In the fixed-quantity arrangement, orders are triggered by a quantity (ROP), while in the fixed- interval arrangement orders are triggered by a time. Therefore, the fixed-interval system must have stockout protection for lead time plus the next order cycle, but the fixed-quantity system needs protection only during lead time because additional orders can be placed at any time

LO13.12 Describe situations in which the fixed-order inter- val model is appropriate, and solve typical problems.

FIGURE 13.15 Comparison of fixed-quantity and fixed-interval ordering

A. Fixed quantity

B. Fixed interval

Order quantity

Order quantity

Order quantity

Place order

Receive order

Place order

Receive order

Place order

Receive order

LT (Protection interval = Lead time)

Time

Safety stock

ROP

A m

o u

n t

o n

h an

d

Order quantity

Order quantity

Order quantity

Place order

Receive order

Place order

Receive order

Place order

Receive order

OI Time

Safety stock

LT

Protection interval

A m

o u

n t

o n

h an

d

ste24102_ch13_546-603.indd 574ste24102_ch13_546-603.indd 574 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 575

and will be received shortly (lead time) thereafter. Consequently, there is a greater need for safety stock in the fixed-interval model than in the fixed-quantity model. Note, for example, the large dip into safety stock during the second order cycle with the fixed-interval model.

Both models are sensitive to demand experience just prior to reordering, but in somewhat different ways. In the fixed-quantity model, a higher-than-normal demand causes a shorter time between orders, whereas in the fixed-interval model, the result is a larger order size. Another difference is that the fixed-quantity model requires close monitoring of inventory levels in order to know when the amount on hand has reached the reorder point. The fixed- interval model requires only a periodic review (i.e., physical count) of inventory levels just prior to placing an order to determine how much is needed.

Order size in the fixed-interval model is determined by the following computation:

� � �

� � � � � �

Amount to order

Expected demand during protection

interval

Safety stock

Amount on hand at reorder time

(OI LT) OI LTQ d z Ad

(13–16)

where

OI   �  Order interval (length of time between orders)

A   �  Amount on hand at reorder time

As in previous models, we assume that demand during the protection interval is normally distributed.

E X A M P L E 1 0

e celx mhhe.com/stevenson12e

Given the following information, determine the amount to order.

d

d

� �

30 units per day

3 units per day

LT 2 days

Desired service level 99 percent

Amount on hand at reorder time 71 units OI 7 days

S O L U T I O N z   �  2.33 for 99 percent service level

d z A

Q

d Amount to order (OI LT) OI LT

30(7 2) 2.33(3) 7 2 71 220 units

� � � � � �

� � � � � �

An issue related to fixed-interval ordering is the risk of a stockout. From the perspective (i.e., the point in time) of placing an order, there are two points in the order cycle at which a stockout could occur. One is shortly after the order is placed, while waiting to receive the current order (refer to Figure 13.15 ). The second point is near the end of the cycle, while waiting to receive the next order.

To find the initial risk of a stockout, use the ROP formula (13–13), setting ROP equal to the quantity on hand when the order is placed, and solve for z, then obtain the service level for that value of z from Appendix B, Table B, and subtract it from 1.0000 to get the risk of a stockout.

To find the risk of a stockout at the end of the order cycle, use the fixed-interval formula (13–16) and solve for z. Then obtain the service level for that value of z from Appendix B, Table B, and subtract it from 1.0000 to get the risk of a stockout.

Let's look at an example.

E X A M P L E 1 1

e celx mhhe.com/stevenson12e

Given the following information:

A

Q

d

d

� �

� �

� �

LT 4 days 43 units

OI 12 days 171 units

10 units/day

2 units/day

Determine the risk of a stockout at

a. The end of the initial lead time.

b. The end of the second lead time.

ste24102_ch13_546-603.indd 575ste24102_ch13_546-603.indd 575 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

576 Chapter Thirteen Inventory Management

Benefits and Disadvantages The fixed-interval system results in tight control. In addition, when multiple items come from the same supplier, grouping orders can yield savings in ordering, packing, and shipping costs. Moreover, it may be the only practical approach if inventory withdrawals cannot be closely monitored.

On the negative side, the fixed-interval system necessitates a larger amount of safety stock for a given risk of stockout because of the need to protect against shortages during an entire order interval plus lead time (instead of lead time only), and this increases the carrying cost. Also, there are the costs of the periodic reviews.

13.8 THE SINGLE-PERIOD MODEL The single-period model (sometimes referred to as the newsboy problem ) is used to handle ordering of perishables (fresh fruits, vegetables, seafood, cut flowers) and items that have a limited useful life (newspapers, magazines, spare parts for specialized equipment). The period for spare parts is the life of the equipment, assuming that the parts cannot be used for other equipment. What sets unsold or unused goods apart is that they are not typically car- ried over from one period to the next, at least not without penalty. Day-old baked goods, for instance, are often sold at reduced prices; leftover seafood may be discarded; and out-of-date magazines may be offered to used book stores at bargain rates. There may even be some cost associated with disposal of leftover goods.

Analysis of single-period situations generally focuses on two costs: shortage and excess. Shortage cost may include a charge for loss of customer goodwill as well as the opportunity cost of lost sales. Generally, shortage cost is simply unrealized profit per unit. That is,

Revenue per unit Cost per unitshortageC Cs� � �

If a shortage or stockout relates to an item used in production or to a spare part for a machine, then shortage cost refers to the actual cost of lost production.

Excess cost pertains to items left over at the end of the period. In effect, excess cost is the difference between purchase cost and salvage value. That is,

Original cost per unit Salvage value per unitexcessC Ce� � �

If there is cost associated with disposing of excess items, the salvage will be negative and will therefore increase the excess cost per unit.

The goal of the single-period model is to identify the order quantity, or stocking level, that will minimize the long-run excess and shortage costs.

There are two general categories of problems that we will consider: those for which demand can be approximated using a continuous distribution (perhaps a theoretical one such as a uniform or normal distribution) and those for which demand can be approximated using a discrete distribution (say, historical frequencies or a theoretical distribution such as the Poisson). The kind of inventory can indicate which type of model might be appropriate. For example, demand for petroleum, liquids, and gases tends to vary over some continuous scale,

LO13.13 Describe situations in which the single-period model is appropriate and solve typical problems.

Single-period model  Model for ordering of perishables and other items with limited useful lives.

Shortage cost  Generally, the unrealized profit per unit.

Excess cost  Difference between purchase cost and sal- vage value of items left over at the end of a period.

S O L U T I O N a. For the risk of stockout for the first lead time, we use Formula 13–13. Substituting the given values, we get 43  �  10  �  4  �   z (2)(2). Solving, z   �   � .75. From Appendix B, Table B, the service level is .7734. The risk is 1  �  .7734  �  .2266, which is fairly high.

b. For the risk of a stockout at the end of the second lead time, we use Formula 13–16. Substituting the given values we get 171  �  10  �  (4  �  12)  �   z (2)(4)  �  43. Solving, z   �  16.75. This value is way out in the right tail of the normal distribution, making the service level virtually 100 percent, and, thus, the risk of a stockout at this point is essen- tially equal to zero.

ste24102_ch13_546-603.indd 576ste24102_ch13_546-603.indd 576 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 577

thus lending itself to description by a continuous distribution. Demand for tractors, cars, and computers is expressed in terms of the number of units demanded and lends itself to descrip- tion by a discrete distribution.

Continuous Stocking Levels The concept of identifying an optimal stocking level is perhaps easiest to visualize when demand is uniform. Choosing the stocking level is similar to balancing a seesaw, but instead of a person on each end of the seesaw, we have excess cost per unit ( C e ) on one end of the distribution and shortage cost per unit ( C s ) on the other. The optimal stocking level is analo- gous to the fulcrum of the seesaw; the stocking level equalizes the cost weights, as illustrated in Figure 13.16 .

The service level is the probability that demand will not exceed the stocking level, and computation of the service level is the key to determining the optimal stocking level, S o .

Service level C

C C s

s e �

� (13–17)

where

C s   �  Shortage cost per unit

C e   �  Excess cost per unit

If actual demand exceeds S o , there is a shortage; hence, C s is on the right end of the distri- bution. Similarly, if demand is less than S o , there is an excess, so C e is on the left end of the distribution. When C e   �   C s , the optimal stocking level is halfway between the endpoints of the distribution. If one cost is greater than the other, S o will be closer to the larger cost.

FIGURE 13.16 The optimal stocking level balances unit shortage and excess costs Service level

Ce Cs

So Balance point

Quantity

So = Optimum stocking quantity

E X A M P L E 1 2

e celx mhhe.com/stevenson12e

S O L U T I O N

Sweet cider is delivered weekly to Cindy's Cider Bar. Demand varies uniformly between 300 liters and 500 liters per week. Cindy pays 20 cents per liter for the cider and charges 80 cents per liter for it. Unsold cider has no salvage value and cannot be carried over into the next week due to spoilage. Find the optimal stocking level and its stockout risk for that quantity.

C

C

C

C C

e

s

s

s e

� �

� �

� �

� �

� �

� �

Cost per unit Salvage value per unit

$.20 $0

$.20 per unit

Revenue per unit Cost per unit

$.80 $.20

$.60 per unit

SL $.60

$.60 $.20 .75

ste24102_ch13_546-603.indd 577ste24102_ch13_546-603.indd 577 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

578 Chapter Thirteen Inventory Management

A similar approach applies when demand is normally distributed.

Thus, the optimal stocking level must satisfy demand 75 percent of the time. For the uniform distribution, this will be at a point equal to the minimum demand plus 75 percent of the differ- ence between maximum and minimum demands:

300 .75(500 300) 450 litersSo � � � �

75%

300 450 500

The stockout risk is 1.00  �  .75  �  .25.

E X A M P L E 1 3

e celx mhhe.com/stevenson12e

S O L U T I O N

Cindy's Cider Bar also sells a blend of cherry juice and apple cider. Demand for the blend is approximately normal, with a mean of 200 liters per week and a standard deviation of 10 liters per week. C s   �  60 cents per liter, and C e   �  20 cents per liter. Find the optimal stocking level for the apple-cherry blend.

SL

$.60

$.60 $.20 .75

C

C C s

s e �

� �

� �

This indicates that 75 percent of the area under the normal curve must be to the left of the stocking level. Appendix B, Table B, shows that a value of z between � .67 and � .68, Use the value of z that has a probability nearest to .75. In this case, it is .67. The optimal stocking level is S o   �  mean  �   z � . Thus,

S 200 liters .67(10 liters) 206.7 literso � � �

200 So Quantity

75%

Discrete Stocking Levels When stocking levels are discrete rather than continuous, the service level computed using the ratio C s /( C s   �   C e ) usually does not coincide with a feasible stocking level (e.g., the optimal amount may be between five and six units). The solution is to stock at the next higher level (e.g., six units). In other words, choose the stocking level so that the desired service level is equaled or exceeded. Figure 13.17 illustrates this concept.

Example 14 illustrates the use of an empirical distribution.

ste24102_ch13_546-603.indd 578ste24102_ch13_546-603.indd 578 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 579

The logic behind Formula 13–17 can be seen by solving the problem using a decision table approach. Table 13.3 illustrates this approach. The table enumerates the expected cost of each combination of stocking level and demand. For instance, if the stocking level is three, and demand turns out to be zero (see the blue-shaded cell), that would result in an excess of three units, at a cost of $800 each. The probability of a demand of zero units is .20, so the expected cost of that cell is .20(3)($800)  �  $480. Similarly, if no units are stocked and demand is two (see the yellow-shaded cell), the expected cost is the probability of demand being two (i.e., .30) multiplied by two units multiplied by the shortage cost per unit. Thus, the expected cost is .30(2)($4,200)  �  $2,520. For the cases in which the demand and stocking level are the same (the green-shaded cells), supply  �  demand, so there is neither a shortage nor an excess, and thus the cost is $0.

FIGURE 13.17 The service level achievement must equal or exceed the ratio Cs /( Cs   �   Ce )

Stocking level

Cs

10 2 4 63 5 7 8

Cs + Ce

Cumulative probability

Service level

=

E X A M P L E 1 4

e celx mhhe.com/stevenson12e

S O L U T I O N

Historical records on the use of spare parts for several large hydraulic presses are to serve as an estimate of usage for spares of a newly installed press. Stockout costs involve downtime expenses and special ordering costs. These average $4,200 per unit short. Spares cost $800 each, and unused parts have zero salvage. Determine the optimal stocking level.

Spares Used Relative Frequency Cumulative Frequency

0 .20 .20

1 .40 .60

2 .30 .90

3 .10 1.00

4 or more .00

1.00

$4,200 $800 SL $4,200

$4,200 $800 .84C C

C

C C s e

s

s e � � �

� �

� �

The cumulative-frequency column indicates the percentage of time that demand did not exceed (was equal to or less than) some amount. For example, demand does not exceed one spare 60 percent of the time, or two spares 90 percent of the time. Thus, in order to achieve a service level of at least 84 percent, it will be necessary to stock two spares (i.e., to go to the next higher stocking level).

ste24102_ch13_546-603.indd 579ste24102_ch13_546-603.indd 579 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

580 Chapter Thirteen Inventory Management

The lowest expected cost is $1,060, which occurs for a stocking level of two units, so two is the optimal stocking level, which agrees with the ratio approach.

Example 15 illustrates how to solve a problem when demand is described by a Poisson distribution.

And the demand probabilities are If the stocking level is

0  prob.  �  .20

1  prob.  �  .40

2  prob.  �  .30

3  prob.  �  .10

The expected cost will be

0 S  �  D $0

1 unit short .40(1) ($4,200)  �  $1,680

2 units short .30(2) ($4,200)  �  $2,520

3 units short .10(3) ($4,200)  �  $1,260 $5,460

1 1-unit excess .20(1) ($800)  �  $160

S  �  D $0

1 unit short .30(1) ($4,200)  �  $1,260

2 units short .10(2) ($4,200)  �  $840 $2,260

2 2-unit excess .20(2) ($800)  �  $320

1-unit excess .40(1) ($800)  �  $320

S  �  D $0

1 unit short .10(1) ($4,200)  �  $420 $1,060

3 3-unit excess .20(3) ($800)  �  $480

2-unit excess .40(2) ($800)  �  $640

1-unit excess .30(1) ($800)  �  $240

S  �  D $0 $1,360

TABLE 13.3 Expected cost for each possible outcome

E X A M P L E 1 5

e celx mhhe.com/stevenson12e

S O L U T I O N

One final point about discrete stocking levels: If the computed service level is exactly equal to the cumulative probability associated with one of the stocking levels, there are two equivalent stocking levels in terms of minimizing long-run cost—the one with equal probability and the next higher one. In the preceding example, if the ratio had been equal to .629, we would be indifferent between stocking four dozen and stocking five dozen roses each day.

$3 $2 SL

$3

$3 $2 .60C C

C

C C s e

s

s e � � �

� �

� �

Obtain the cumulative frequencies from the Poisson table (Appendix B, Table C) for a mean of 4.0:

Demand (dozen per day) Cumulative Frequency

0 .018

1 .092

2 .238

3 .433

4 .629

5 .785

� �

Compare the service level to the cumulative frequencies. In order to attain a service level of at least .60, it is necessary to stock four dozen.

Demand for long-stemmed red roses at a small flower shop can be approximated using a Pois- son distribution that has a mean of four dozen per day. Profit on the roses is $3 per dozen. Leftover flowers are marked down and sold the next day at a loss of $2 per dozen. Assume that all marked-down flowers are sold. What is the optimal stocking level?

ste24102_ch13_546-603.indd 580ste24102_ch13_546-603.indd 580 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 581

13.9 OPERATIONS STRATEGY

Inventories often represent a substantial investment. More important, improving inventory processes can offer significant benefits in terms of cost reduction and customer satisfaction. Among the areas that have potential are the following:

Record keeping. It is important to have inventory records that are accurate and up-to-date, so that inventory decisions are based on correct information. Estimates of holding, order- ing, and setup costs, as well as demand and lead times, should be reviewed periodically and updated when necessary.

Variation reduction. Lead time variations and forecast errors are two key factors that impact inventory management, and variation reduction in these areas can yield significant improvement in inventory management.

Lean operation. Lean systems are demand driven, which means that goods are pulled through the system to match demand instead of being pushed through without a direct link to demand. Moreover, lean systems feature smaller lot sizes than more traditional systems, based in part on the belief that holding costs are higher than those assigned by traditional systems, and partly as a deliberate effort to reduce ordering and setup costs by simplifying and standardizing neces- sary activities. An obvious benefit is a decrease in average inventory on hand and, hence, lower carrying costs. Other benefits include fewer disruptions of work flow, reduction in space needs, enhanced ability to spot problems, and increased feasibility to place machines and workers closer together, which allows more opportunities for socialization, communication, and cooperation.

Supply chain management. Working more closely with suppliers to coordinate shipments, reduce lead times, and reduce supply chain inventories can reduce the size and frequency of stockouts while lowering inventory carrying costs. Blanket orders and vendor-managed inventories can reduce transaction costs. Also, consignment agreements, where buyers are not charged for inventory items until the items are sold, may be an option. Storage costs can sometimes be reduced by using cross-docking, whereby inbound trucks with goods arriving at distributor warehouses from suppliers are directly loaded onto outbound trucks for store or dealer delivery, avoiding warehouse handling and storage costs.

Inventory management is a core operations management activity. Good inventory management is often the mark of a well-run organization. Inventory levels must be planned carefully in order to balance the cost of holding inventory and the cost of providing reasonable levels of customer service. Successful inventory management requires a system to keep track of inventory transactions, accurate information about demand and lead times, realistic estimates of certain inventory-related costs, and a priority system for classifying the items in inventory and allocating control efforts.

Four classes of models are described: EOQ, ROP, fixed-order-interval, and single-period models. The first three are appropriate if unused items can be carried over into subsequent periods. The single- period model is appropriate when items cannot be carried over. EOQ models address the question of how much to order. The ROP models address the question of when to order and are particularly helpful in dealing with situations that include variations in either demand rate or lead time. ROP models involve service level and safety stock considerations. When the time between orders is fixed, the FOI model is useful for determining the order quantity. The single-period model is used for items that have a “shelf life” of one period. The models presented in this chapter are summarized in Table 13.4 .

SUMMARY

1. All businesses carry inventories, which are goods held for future use or potential future use.

2. Inventory represents money that is tied up in goods or materials.

3. Effective inventory decisions depend on having good inventory records, good cost information, and good estimates of demand.

4. The decision of how much inventory to have on hand reflects a trade-off, for example, how much money to tie up in inventory versus having it available for other uses. Factors related to the deci- sion include purchase costs, holding costs, ordering costs, shortage and backlog costs, available space to store the inventory, and the return that can be had from other uses of the money.

5. As with other areas of operations, variations are present and must be taken into account. Uncertainties can be offset to some degree by holding safety stock, although that adds to the cost of holding inventory.

KEY POINTS

ste24102_ch13_546-603.indd 581ste24102_ch13_546-603.indd 581 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

582 Chapter Thirteen Inventory Management

A-B-C approach, 554 cycle counting, 556 cycle stock, 557 economic order quantity (EOQ), 557 excess cost, 576 fill rate, 573 fixed-order-interval (FOI) model, 573 holding (carrying) cost, 553

inventory, 547 inventory turnover, 551 lead time, 553 Little's Law, 550 ordering costs, 554 periodic system, 551 perpetual inventory system, 551 point-of-sale (POS) system, 552 purchase cost, 553

quantity discounts, 564 reorder point (ROP), 569 safety stock, 557, 569 service level, 570 setup costs, 554 shortage costs, 554, 576 single-period model, 576 two-bin system, 552 universal product code (UPC), 552

KEY TERMS

TABLE 13.4 Summary of inventory formulas

Model Formula Symbols

1. Basic EOQ Q

DS H

2 0 � (13–2)

� �TC 2

H Q D

Q S (13–1)

Q D

Length of order cycle � (13–3)

Average inventory

2

Q �

Q o   �  Economic order quantity D   �  Annual demand S   �  Order cost per order H   �  Annual carrying cost per unit Q   �  Order quantity

2. Economic production quantity Q

DS H

p p u

p 2

� �

(13–5)

� �TC 2

I H

D Q

Smax (13–4)

Q u

Cycle time � (13–6)

Q p

Run time � (13–7)

I Q p

p u( )max 0

� � (13–8)

Average inventory

2 maxI

Q p   �  Optimal run or order size p   �  Production or delivery rate u   �  Usage rate I max   �  Maximum inventory level

3. Quantity discounts Q H

D Q

S PDTC 2

� � � (13–9) P   �  Unit price

4. Reorder point under: a. Constant demand and lead time b. Variable demand rate c. Variable lead time d. Variable lead time and demand

dROP (LT)� (13–10)

d z dROP LT ( ) LT� � � (13–13)

d z dROP LT ( )LT� � � (13–14)

� � � � �ROP LT LT 2 2 2

LTd z dd (13–15)

ROP  �  Quantity on hand at reorder point d   �  Demand rate LT   �  Lead time

d Average demand rate� � d   �  Standard deviation of demand rate z   �  Standard normal deviation

LT Average lead time� � LT   �  Standard deviation of lead time

5. Fixed interval Q d

z Ad

(OI LT)

OI LT

� �

� � � � (13–16)

OI  �  Time between orders A   �  Amount on hand at order time

6. Single period

C C C

s

s e SL �

� (13–17)

SL  �  Service level C s   �  Shortage cost per unit C e   �  Excess cost per unit

ste24102_ch13_546-603.indd 582ste24102_ch13_546-603.indd 582 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 583

SOLVED PROBLEMS

Basic EOQ. This type of problem can be recognized when annual demand ( D ), ordering cost ( S ), and holding or carrying cost per unit ( H ) are given. Use Formula 13–2 for order quantity, Formula 13–1 for total cost, and D / Q for number of orders a year.

A toy manufacturer uses approximately 32,000 silicon chips annually. The chips are used at a steady rate during the 240 days a year that the plant operates. Annual holding cost is $3 per chip, and ordering cost is $120. Determine

a. The optimal order quantity.

b. The number of workdays in an order cycle.

D S

H

� �

32,000 chips per year $120

$3 per unit per year

a. 2 2(32,000)120

3 1,600 chips.0Q

DS

H � � �

b. 1,600 chips

32,000 chips/yr.

1

20 year (i.e., 120 240 days), or 12 days

Q

D � � �

Economic production quantity. This type of problem can be recognized when a production rate ( p ) is given in addition to the basic EOQ information. Use Formula 13–5 to compute the optimal run quantity. Production (run) time is Q / p.   I max is (Q/p)(p � u). The time between the end of one run and the start of the next is ( I max )/ u   �  setup time.

The Dine Corporation is both a producer and a user of brass couplings. The firm operates 220 days a year and uses the couplings at a steady rate of 50 per day. Couplings can be produced at a rate of 200 per day. Annual storage cost is $2 per coupling, and machine setup cost is $70 per run.

a. Determine the economic run quantity.

b. Approximately how many runs per year will there be?

c. Compute the maximum inventory level.

d. What is the average inventory on hand?

e. Determine the length of the pure consumption portion of the cycle.

D

S

H

p

u

� � �

50 units per day 220 days per year 11,000 units per year

$70 per order

$2 per unit per year

200 units per day

50 units per day

a. 2 2(11,000)70

2

200

200 50 1,013 units.Q

DS

H

p

p u p �

� �

� �

b. Number of runs per year: D / Q 0   �  11,000/1,013  �  10.86, or approximately 11.

c. ( ) 1,013

200 (200 50) 759.75maxI

Q

p p u

p � � � � � or 760 units.

d. Average inventory  �   I max/2   �  760/2  �  380 units.

e. Imax/u � 760/50 � 15.2 days.

Problem 1

Solution

Problem 2

Solution

ste24102_ch13_546-603.indd 583ste24102_ch13_546-603.indd 583 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

584 Chapter Thirteen Inventory Management

Quantity discounts. This type of problem can be recognized when a list showing prices for each quantity range is given along with the basic EOQ information.

a. If unit holding cost is constant, use these steps to solve the problem: 1. Use Formula 13–2 to find Q. 2. Locate Q in the price schedule. 3. Compute TC using Formula 13–1 for Q and for all lower-cost price breaks.

b. If unit holding cost is a percentage of unit price, use these steps to solve the problem: 1. Beginning with the lowest cost, and using the corresponding H for that cost, compute Q

using Formula 13–2. Continue moving up in unit cost until a feasible Q is found. 2. Locate the feasible Q in the price schedule. 3. Compute TC using Formula 13–9 for Q and for all lower-cost price breaks. Remember to use

the corresponding H for each price.

A small manufacturing firm uses roughly 3,400 pounds of chemical dye a year. Currently the firm purchases 300 pounds per order and pays $3 per pound. The supplier has just announced that orders of 1,000 pounds or more will be filled at a price of $2 per pound. The manufacturing firm incurs a cost of $100 each time it submits an order and assigns an annual holding cost of 17 percent of the purchase price per pound.

a. Determine the order size that will minimize the total cost.

b. If the supplier offered the discount at 1,500 pounds instead of 1,000 pounds, what order size would minimize total cost?

3,400 pounds per year $100 per order .17D S H P� � �

a. Compute the EOQ for $2 per pound: The quantity ranges are

2 2(3,400)100

.17(2) 1,414 pounds$2/poundQ

DS

H � � �

Because this quantity is feasible at $2 per pound, it is the optimum.

b. When the discount is offered at 1,500 pounds, the EOQ for the $2 per pound range is no longer feasible. Consequently, it becomes necessary to compute the EOQ for $3 per pound and compare the total cost for that order size with the total cost using the price break quantity (i.e., 1,500).

⎛ ⎝⎜

⎞ ⎠⎟

⎛ ⎝⎜

⎞ ⎠⎟

⎛ ⎝⎜

⎞ ⎠⎟

⎛ ⎝⎜

⎞ ⎠⎟

⎛ ⎝⎜

⎞ ⎠⎟

⎛ ⎝⎜

⎞ ⎠⎟

Q DS

H

Q H

D

Q S PD

� �

� � �

� � �

� � � �

� � �

� � � �

� 2 2(3,400)100

.17(3) 1,155 pounds

TC 2

TC 1,155

2 .17(3)

3,400

1,155 100 3(3,400)

$294.53 $294.37 $10,200 $10,789

TC 1,500

2 .17(2)

3,400

1,500 100 2(3,400)

$255 $226.67 $6,800 $7,282

$3/pound

1,155

1,500

Hence, because it would result in a lower total cost, 1,500 is the optimal order size.

Problem 3

Solution

Range Unit Price

1 to 999 $3

1,000 � $2

ste24102_ch13_546-603.indd 584ste24102_ch13_546-603.indd 584 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 585

Reorder point. This type of problem can be recognized when the demand rate ( d ), lead time (LT), and desired service level or stockout risk are given. Use these steps to solve this type of problem:

1. Match the choice of formula to the standard deviation(s) that are given in the problem (e.g., if both demand and lead time standard deviations are given, use Formula 13–15 for the ROP).

2. If the problem asks for the amount of safety stock, use the second part of the appropriate ROP formula.

3. If the “expected demand during lead time” and the “standard deviation of lead time demand” are given, use Formula 13–12.

ROP for variable demand and constant lead time. The Problem 4housekeeping department of a motel uses approximately 400 washcloths per day. The actual number tends to vary with the number of guests on any given night. Usage can be approximated by a normal distribution that has a mean of 400 and a standard deviation of nine washcloths per day. A linen supply company delivers towels and washcloths with a lead time of three days. If the motel policy is to maintain a stockout risk of 2 percent, what is the minimum number of washcloths that must be on hand at reorder time, and how much of that amount can be considered safety stock?

d

d

� �

� � � �

400 washcloths per day LT 3 days

9 washcloths per day Risk 2 percent, so service level 98 percent

From Appendix B, Table B, the nearest z value that corresponds to an area under the normal curve to the left of z for 98 percent is � 2.05.

ROP LT LT 400(3) 2.05(9) 3

1,200 31.96, or approximately 1,232 washcloths

d z d� � � � �

� �

Safety stock is approximately 32 washcloths.

ROP for constant demand and variable lead time. The motel in the preceding example uses approxi- mately 600 bars of soap each day, and this tends to be fairly constant. Lead time for soap delivery is normally distributed with a mean of six days and a standard deviation of two days. A service level of 90 percent is desired.

a. Find the ROP.

b. How many days of supply are on hand at the ROP?

Problem 4

Solution

1,200 1,232

2% SL = 98%

Problem 5

Quantity

T o

ta l c

o st

0 1,5001,155 1,414

ste24102_ch13_546-603.indd 585ste24102_ch13_546-603.indd 585 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

586 Chapter Thirteen Inventory Management

d

z

� � �

� �

600 bars per day

SL 90 percent, so 1.28 (from Appendix B, Table B)

LT 6 days

2 daysLT

a. d z d� � � � �

ROP LT ( ) 600(6) 1.28(2)(600)

5,136 bars of soap

LT

b. ROP 5,136

600 8.56 days

d � �

ROP for variable demand rate and variable lead time. The motel replaces broken glasses at a rate of 25 per day. In the past, this quantity has tended to vary normally and have a standard deviation of three glasses per day. Glasses are ordered from a Cleveland supplier. Lead time is normally dis- tributed with an average of 10 days and a standard deviation of 2 days. What ROP should be used to achieve a service level of 95 percent?

d

z

d z d

d

d

25 glasses per day LT 10 days

3 glasses per day 2 days

SL 95 percent, so 1.65 (Appendix B, Table B)

ROP LT LT

25(10) 1.65 10(3) (25) (2) 334 glasses

LT

2 2 2

LT

2 2 2

� �

� � � �

� � �

� � � � �

� � � �

Fixed-order-interval. This type of problem can be recognized when an order interval is given (e.g., inventory is ordered every 10 days) along with the demand rate, lead time, and quantity on hand at order time. Use Formula 13–16 to find the optimal order size.

A lab orders a number of chemicals from the same supplier every 30 days. Lead time is five days. The assistant manager of the lab must determine how much of one of these chemicals to order. A check of stock revealed that eleven 25-milliliter (ml) jars are on hand. Daily usage of the chemical is approximately normal with a mean of 15.2 ml per day and a standard deviation of 1.6 ml per day. The desired service level for this chemical is 95 percent.

a. How many jars of the chemical should be ordered?

b. What is the average amount of safety stock of the chemical?

d z

d

� � � �

� � � � � �

15.2 ml per day OI 30 days SL 95 percent requires 1.65

1.6 ml per day LT 5 days A 11 jars 25 ml per jar 275 ml

Solution

Problem 6

Solution

Problem 7

Solution

3,600 5,136

SL = 90%

250 334

SL = 95%

ste24102_ch13_546-603.indd 586ste24102_ch13_546-603.indd 586 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 587

a. d z Ad� � � � � �

� � � � � �

Amount to order (OI LT) OI LT

15.2(30 5) 1.65(1.6) 30 5 275 272.62 ml

Convert this to number of jars:

272.62 ml

25 ml per jar 10.90 or 11 jars�

b. Safety stock OI LT 1.65(1.6) 30 5 15.62 ml.z d� � � � � �

Single-period. This type of problem can be recognized when a probability distribution or empirical distribution for demand for a “perishable” item is given along with unit shortage and excess costs, or information that can be used to calculate them. Use these steps to solve the problem:

1. Compute the optimal service level using Formula 13–17.

2. If the given distribution is uniform or normal, use that to obtain the exact stocking level.

3. If the distribution is Poisson or empirical, SL will fall between two cumulative frequencies. Round up to the higher frequency to find the optimal stocking level. Note: If the distribution is empirical, first obtain the cumulative frequencies or probabilities.

A firm that installs cable TV systems uses a certain piece of equipment for which it carries two spare parts as optimal. The parts cost $500 each and have no salvage value or useful life after one period. Part failures can be modeled by a Poisson distribution with a mean of two failures during the useful life of the equipment. Holding and disposal costs are negligible. Estimate the apparent range of shortage cost.

is unknown $500C Cs e �

The Poisson table (Appendix B, Table C) provides these values for a mean of 2.0:

For the optimal stocking level, the service level must usually be rounded up to a feasible stocking level. Hence, you know that the service level must have been between .406 and .677 in order to make two units the optimal level. By setting the service level equal first to .406 and then to .677, you can establish bounds on the possible range of shortage costs.

$500 .406, so .406($500 )

C

C C C

s

s s s

� � � �

Solving, you find C s   �  $341.75. Similarly,

$500 .677, so .677($500 )

C

C C C

s

s s s

� � � �

Solving, you find C s   �  $1,047.99. Hence, the apparent range of shortage cost is $341.75 to $1,047.99.

Problem 8

Solution

Number of Failures

Cumulative Probability

0 .135 1 .406 2 .677 3 .857 4 .947 5 .983 � �

ste24102_ch13_546-603.indd 587ste24102_ch13_546-603.indd 587 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

588 Chapter Thirteen Inventory Management

1. What are the primary reasons for holding inventory?

2. What are the requirements for effective inventory management?

3. Briefly describe each of the costs associated with inventory.

4. What potential benefits and risks do RFID tags have for inventory management?

5. Why might it be inappropriate to use inventory turnover ratios to compare inventory performance of companies that are in different industries?

6. How can managers use the results of A-B-C classification?

7. a. List the major assumptions of the EOQ model. b. How would you respond to the criticism that EOQ models tend to provide misleading results

because values of D, S, and H are, at best, educated guesses?

8. Explain briefly how a higher carrying cost can result in a decrease in inventory.

9. What is safety stock, and what is its purpose?

10. Under what circumstances would the amount of safety stock held be a. Large? b. Small? c. Zero?

11. What is meant by the term service level? Generally speaking, how is service level related to the amount of safety stock held?

12. Describe briefly the A-B-C approach to inventory control.

13. The purchasing agent for a company that assembles and sells air-conditioning equipment in a Latin American country noted that the cost of compressors has increased significantly each time they have been reordered. The company uses an EOQ model to determine order size. What are the implications of this price escalation with respect to order size? What factors other than price must be taken into consideration?

14. Explain how a decrease in setup time can lead to a decrease in the average amount of inventory a firm holds, and why that would be beneficial.

15. What is the single-period model, and under what circumstances is it appropriate?

16. Can the optimal stocking level in the single-period model ever be less than expected demand? Explain briefly.

17. What are some ways in which a company can reduce the need for inventories?

DISCUSSION AND REVIEW QUESTIONS

1. What trade-offs are involved in each of these aspects of inventory management? a. Buying additional amounts to take advantage of quantity discounts. b. Treating holding cost as a percentage of unit price instead of as a constant amount. c. Conducting cycle counts once a quarter instead of once a year.

2. Who needs to be involved in inventory decisions involving holding costs? Setting inventory levels? Quantity discount purchases?

3. How has technology aided inventory management? How have technological improvements in prod- ucts such as automobiles and computers impacted inventory decisions?

TAKING STOCK

1. To be competitive, many fast-food chains began to expand their menus to include a wider range of foods. Although contributing to competitiveness, this has added to the complexity of operations, including inventory management. Specifically, in what ways does the expansion of menu offerings create problems for inventory management?

2. As a supermarket manager, how would you go about evaluating the criticalness of an inventory shortage?

3. Sam is at the post office to mail a package. After he pays for mailing the package, the clerk asks if he would like to buy some stamps. Sam pauses to think before he answers. He doesn't have a credit card with him. After paying for the package, he has about $30 in his pocket. Analyze this from an inventory standpoint. Identify the relevant considerations.

4. Give two examples of unethical conduct involving inventory management and the ethical principle each one violates.

CRITICAL THINKING EXERCISES

ste24102_ch13_546-603.indd 588ste24102_ch13_546-603.indd 588 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 589

1. a. Determine an A-B-C classification for these items:

b. Find the EOQ given this information: D   �  4,500 units/year,  S   �  $36, and H   �  $10 per unit per year. c. Find the economic production quantity given this information.

D   �  18,000 units/year,  S   �  $100,  H   �  $40 per unit per year, p   �  120 units per day, and u   �  90 units/day.

2. a. The following table contains figures on the monthly volume and unit costs for a random sample of 16 items from a list of 2,000 inventory items at a health care facility. Develop an A-B-C clas- sification for these items:

b. Given the monthly usages in the following table, classify the items in A, B, and C categories according to dollar usage:

Item Unit Cost Annual Volume (00)

1 $100 25 2 80 30 3 15 60 4 50 10 5 11 70 6 60 85 7 10 60

Item Unit Cost Usage Item Unit Cost Usage

K34 $10 200 F99 20 60 K35 25 600 D45 10 550 K36 36 150 D48 12 90 M10 16 25 D52 15 110 M20 20 80 D57 40 120 Z45 80 200 N08 30 40 F14 20 300 P05 16 500 F95 30 800 P09 10 30

PROBLEMS

Item Usage Unit Cost

4021 90 $1,400 9402 300 12 4066 30 700 6500 150 20 9280 10 1,020 4050 80 140 6850 2,000 10 3010 400 20 4400 5,000 5

c. Determine the percentage of items in each category and the annual dollar value for each cat- egory for part b.

3. A bakery buys flour in 25-pound bags. The bakery uses 1,215 bags a year. Ordering cost is $10 per order. Annual carrying cost is $75 per bag. a. Determine the economic order quantity. b. What is the average number of bags on hand? c. How many orders per year will there be? d. Compute the total cost of ordering and carrying flour. e. If holding costs were to increase by $9 per year, how much would that affect the minimum total

annual cost?

4. A large law firm uses an average of 40 boxes of copier paper a day. The firm operates 260 days a year. Storage and handling costs for the paper are $30 a year per box, and it costs approximately $60 to order and receive a shipment of paper.

ste24102_ch13_546-603.indd 589ste24102_ch13_546-603.indd 589 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

590 Chapter Thirteen Inventory Management

a. What order size would minimize the sum of annual ordering and carrying costs? b. Compute the total annual cost using your order size from part a. c. Except for rounding, are annual ordering and carrying costs always equal at the EOQ? d. The office manager is currently using an order size of 200 boxes. The partners of the firm

expect the office to be managed “in a cost-efficient manner.” Would you recommend that the office manager use the optimal order size instead of 200 boxes? Justify your answer.

5. Garden Variety Flower Shop uses 750 clay pots a month. The pots are purchased at $2 each. Annual carrying costs per pot are estimated to be 30 percent of cost, and ordering costs are $20 per order. The manager has been using an order size of 1,500 flower pots. a. What additional annual cost is the shop incurring by staying with this order size? b. Other than cost savings, what benefit would using the optimal order quantity yield?

6. A produce distributor uses 800 packing crates a month, which it purchases at a cost of $10 each. The manager has assigned an annual carrying cost of 35 percent of the purchase price per crate. Ordering costs are $28. Currently the manager orders once a month. How much could the firm save annually in ordering and carrying costs by using the EOQ?

7. A manager receives a forecast for next year. Demand is projected to be 600 units for the first half of the year and 900 units for the second half. The monthly holding cost is $2 per unit, and it costs an estimated $55 to process an order. a. Assuming that monthly demand will be level during each of the six-month periods covered by

the forecast (e.g., 100 per month for each of the first six months), determine an order size that will minimize the sum of ordering and carrying costs for each of the six-month periods.

b. Why is it important to be able to assume that demand will be level during each six-month period?

c. If the vendor is willing to offer a discount of $10 per order for ordering in multiples of 50 units (e.g., 50, 100, 150), would you advise the manager to take advantage of the offer in either period? If so, what order size would you recommend?

8. A food processor uses approximately 27,000 glass jars a month for its fruit juice product. Because of storage limitations, a lot size of 4,000 jars has been used. Monthly holding cost is 18 cents per jar, and reordering cost is $60 per order. The company operates an average of 20 days a month. a. What penalty is the company incurring by its present order size? b. The manager would prefer ordering 10 times each month but would have to justify any

change in order size. One possibility is to simplify order processing to reduce the ordering cost. What ordering cost would enable the manager to justify ordering every other day (i.e., 10 times a month)?

9. The Friendly Sausage Factory (FSF) can produce hot dogs at a rate of 5,000 per day. FSF supplies hot dogs to local restaurants at a steady rate of 250 per day. The cost to prepare the equipment for producing hot dogs is $66. Annual holding costs are 45 cents per hot dog. The factory operates 300 days a year. Find a. The optimal run size. b. The number of runs per year. c. How many days does it take to produce the optimal run quantity?

10. A chemical firm produces sodium bisulfate in 100-pound bags. Demand for this product is 20 tons per day. The capacity for producing the product is 50 tons per day. Setup costs $100, and storage and handling costs are $5 per ton a year. The firm operates 200 days a year. ( Note: 1 ton  �  2,000 pounds.) a. How many bags per run are optimal? b. What would the average inventory be for this lot size? c. Determine the approximate length of a production run, in days. d. About how many runs per year would there be? e. How much could the company save annually if the setup cost could be reduced to $25 per run?

11. A company is about to begin production of a new product. The manager of the department that will produce one of the components for the product wants to know how often the machine used to produce the item will be available for other work. The machine will produce the item at a rate of 200 units a day. Eighty units will be used daily in assembling the final product. Assembly will take place five days a week, 50 weeks a year. The manager estimates that it will take almost a full day to get the machine ready for a production run, at a cost of $300. Inventory holding costs will be $10 a year. a. What run quantity should be used to minimize total annual costs? b. How many days does it take to produce the optimal run quantity?

ste24102_ch13_546-603.indd 590ste24102_ch13_546-603.indd 590 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 591

c. What is the average amount of inventory? d. If the manager wants to run another job between runs of this item, and needs a minimum of 10

days per cycle for the other work, will there be enough time? e. Given your answer to part d, the manager wants to explore options that will allow this other job

to be performed using this equipment. Name three options the manager can consider. f. Suppose the manager decides to increase the run size of the new product. How many additional

units would be needed to just accommodate the other job? How much will that increase the total annual cost?

12. A company manufactures hair dryers. It buys some of the components, but it makes the heating ele- ment, which it can produce at the rate of 800 per day. Hair dryers are assembled daily, 250 days a year, at a rate of 300 per day. Because of the disparity between the production and usage rates, the heating elements are periodically produced in batches of 2,000 units. a. Approximately how many batches of heating elements are produced annually? b. If production on a batch begins when there is no inventory of heating elements on hand, how

much inventory will be on hand two days later? c. What is the average inventory of elements, assuming each production cycle begins when there

are none on hand? d. The same equipment that is used to make the heating elements could also be used to make

a component for another of the firm's products. That job would require four days, including setup. Setup time for making a batch of the heating elements is a half day. Is there enough time to do this job between production of batches of heating elements? Explain.

13. A mail-order house uses 18,000 boxes a year. Carrying costs are 60 cents per box a year, and order- ing costs are $96. The following price schedule applies. Determine a. The optimal order quantity. b. The number of orders per year.

14. A jewelry firm buys semiprecious stones to make bracelets and rings. The supplier quotes a price of $8 per stone for quantities of 600 stones or more, $9 per stone for orders of 400 to 599 stones, and $10 per stone for lesser quantities. The jewelry firm operates 200 days per year. Usage rate is 25 stones per day, and ordering costs are $48. a. If carrying costs are $2 per year for each stone, find the order quantity that will minimize total

annual cost. b. If annual carrying costs are 30 percent of unit cost, what is the optimal order size? c. If lead time is six working days, at what point should the company reorder?

15. A manufacturer of exercise equipment purchases the pulley section of the equipment from a sup- plier who lists these prices: less than 1,000, $5 each; 1,000 to 3,999, $4.95 each; 4,000 to 5,999, $4.90 each; and 6,000 or more, $4.85 each. Ordering costs are $50, annual carrying costs per unit are 40 percent of purchase cost, and annual usage is 4,900 pulleys. Determine an order quantity that will minimize total cost.

16. A company will begin stocking remote control devices. Expected monthly demand is 800 units. The controllers can be purchased from either supplier A or supplier B. Their price lists are as follows:

Ordering cost is $40 and annual holding cost is 25 percent of unit price per unit. Which supplier should be used and what order quantity is optimal if the intent is to minimize total annual costs?

17. A manager just received a new price list from a supplier. It will now cost $1.00 a box for order quantities of 801 or more boxes, $1.10 a box for 200 to 800 boxes, and $1.20 a box for smaller

Number of Boxes Price per Box

1,000 to 1,999 $1.25 2,000 to 4,999 1.20 5,000 to 9,999 1.15 10,000 or more 1.10

SUPPLIER A SUPPLIER B

Quantity Unit Price Quantity Unit Price

1–199 $14.00 1–149 $14.10 200–499 13.80 150–349 13.90

500  � 13.60 350  � 13.70

ste24102_ch13_546-603.indd 591ste24102_ch13_546-603.indd 591 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

592 Chapter Thirteen Inventory Management

quantities. Ordering cost is $80 per order and carrying costs are $10 per box a year. The firm uses 3,600 boxes a year. The manager has suggested a “round number” order size of 800 boxes. The manager's rationale is that with a U-shaped cost curve that is fairly flat at its minimum, the differ- ence in total annual cost between 800 and 801 units would be small anyway. How would you reply to the manager's suggestion? What order size would you recommend?

18. A newspaper publisher uses roughly 800 feet of baling wire each day to secure bundles of newspa- pers while they are being distributed to carriers. The paper is published Monday through Saturday. Lead time is six workdays. What is the appropriate reorder point quantity, given that the company desires a service level of 95 percent, if that stockout risk for various levels of safety stock is as fol- lows: 1,500 feet, .10; 1,800 feet, .05; 2,100 feet, .02; and 2,400 feet, .01?

19. Given this information:

Expected demand during lead time  �  300 units

Standard deviation of lead time demand  �  30 units

Determine each of the following, assuming that lead time demand is distributed normally: a. The ROP that will provide a risk of stockout of 1 percent during lead time. b. The safety stock needed to attain a 1 percent risk of stockout during lead time. c. Would a stockout risk of 2 percent require more or less safety stock than a 1 percent risk?

Explain. Would the ROP be larger, smaller, or unaffected if the acceptable risk were 2 percent instead of 1 percent? Explain.

20. Given this information:

Lead-time demand  �  600 pounds

Standard deviation of lead time demand  �  52 pounds (Assume normality.)

Acceptable stockout risk during lead time  �  4 percent a. What amount of safety stock is appropriate? b. When should this item be reordered? c. What risk of stockout would result from a decision not to have any safety stock?

21. Demand for walnut fudge ice cream at the Sweet Cream Dairy can be approximated by a normal distribution with a mean of 21 gallons per week and a standard deviation of 3.5 gallons per week. The new manager desires a service level of 90 percent. Lead time is two days, and the dairy is open seven days a week. ( Hint: Work in terms of weeks.) a. If an ROP model is used, what ROP would be consistent with the desired service level? How

many days of supply are on hand at the ROP, assuming average demand? b. If a fixed-interval model is used instead of an ROP model, what order size would be needed for

the 90 percent service level with an order interval of 10 days and a supply of 8 gallons on hand at the order time? What is the probability of experiencing a stockout before this order arrives?

c. Suppose the manager is using the ROP model described in part a. One day after placing an order with the supplier, the manager receives a call from the supplier that the order will be delayed because of problems at the supplier's plant. The supplier promises to have the order there in two days. After hanging up, the manager checks the supply of walnut fudge ice cream and finds that 2 gallons have been sold since the order was placed. Assuming the supplier's promise is valid, what is the probability that the dairy will run out of this flavor before the shipment arrives?

22. The injection molding department of a company uses an average of 30 gallons of special lubricant a day. The supply of the lubricant is replenished when the amount on hand is 170 gallons. It takes four days for an order to be delivered. Safety stock is 50 gallons, which provides a stockout risk of 9 per- cent. What amount of safety stock would provide a stockout risk of 3 percent? Assume normality.

23. A company uses 85 circuit boards a day in a manufacturing process. The person who orders the boards follows this rule: Order when the amount on hand drops to 625 boards. Orders are delivered approxi- mately six days after being placed. The delivery time is normal with a mean of six days and a standard deviation of 1.10 days. What is the probability that the supply of circuit boards will be exhausted before the order is received if boards are reordered when the amount on hand drops to 625 boards?

24. One item a computer store sells is supplied by a vendor who handles only that item. Demand for that item recently changed, and the store manager must determine when to replenish it. The manager wants a probability of at least 96 percent of not having a stockout during lead time. The manager expects demand to average a dozen units a day and have a standard deviation of two units a day. Lead time is variable, averaging four days with a standard deviation of one day. Assume normality and that seasonality is not a factor.

ste24102_ch13_546-603.indd 592ste24102_ch13_546-603.indd 592 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 593

a. When should the manager reorder to achieve the desired probability? b. Why might the model not be appropriate if seasonality were present?

25. The manager of a car wash received a revised price list from the vendor who supplies soap, and a promise of a shorter lead time for deliveries. Formerly the lead time was four days, but now the vendor promises a reduction of 25 percent in that time. Annual usage of soap is 4,500 gallons. The car wash is open 360 days a year. Assume that daily usage is normal, and that it has a standard deviation of 2 gallons per day. The ordering cost is $30 and annual carrying cost is $3 a gallon. The revised price list (cost per gallon) is shown in the following table:

a. What order quantity is optimal? b. What ROP is appropriate if the acceptable risk of a stockout is 1.5 percent?

26. A small copy center uses five 500-sheet boxes of copy paper a week. Experience suggests that usage can be well approximated by a normal distribution with a mean of five boxes per week and a standard deviation of one-half box per week. Two weeks are required to fill an order for letterhead stationery. Ordering cost is $2, and annual holding cost is 20 cents per box. a. Determine the economic order quantity, assuming a 52-week year. b. If the copy center reorders when the supply on hand is 12 boxes, compute the risk of a

stockout. c. If a fixed interval of seven weeks instead of an ROP is used for reordering, what risk does the

copy center incur that it will run out of stationery before this order arrives if it orders 36 boxes when the amount on hand is 12 boxes?

27. Ned's Natural Foods sells unshelled peanuts by the pound. Historically, Ned has observed that daily demand is normally distributed with a mean of 80 pounds and a standard devia- tion of 10 pounds. Lead time also appears normally distributed with a mean of eight days and a standard deviation of one day. What ROP would provide a stockout risk of 10 percent during lead time?

28. Regional Supermarket is open 360 days per year. Daily use of cash register tape averages 10 rolls. Usage appears normally distributed with a standard deviation of 2 rolls per day. The cost of order- ing tape is $1, and carrying costs are 40 cents per roll a year. Lead time is three days. a. What is the EOQ? b. What ROP will provide a lead time service level of 96 percent?

29. A service station uses 1,200 cases of oil a year. Ordering cost is $40, and annual carrying cost is $3 per case. The station owner has specified a service level of 99 percent. a. What is the optimal order quantity? b. What level of safety stock is appropriate if lead time demand is normally distributed with a

mean of 80 cases and a standard deviation of 6 cases?

30. Caring Hospital’s dispensary reorders doses of a drug when the supply on hand falls to 18 units. Lead time for resupply is three days. Given the typical usage over the last 10 days, what service level is achieved with the hospital’s reorder policy? ( Hint: Use Formula 13–13.)

Day 1 2 3 4 5 6 7 8 9 10

Units 3 4 7 5 5 6 4 3 4 5

31. A drugstore uses fixed-order cycles for many of the items it stocks. The manager wants a service level of .98. The order interval is 14 days, and lead time is 2 days. Average demand for one item is 40 units per day, and the standard deviation of demand is 3 units per day. Given the on-hand inven- tory at the reorder time for each order cycle shown in the following table, determine the order quantities for cycles 1, 2, and 3:

Quantity Unit Price

1–399 $2.00 400–799 1.70

800  � 1.62

Cycle On Hand

1 42 2 8 3 103

ste24102_ch13_546-603.indd 593ste24102_ch13_546-603.indd 593 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

594 Chapter Thirteen Inventory Management

32. A manager must set up inventory ordering systems for two new production items, P34 and P35. P34 can be ordered at any time, but P35 can be ordered only once every four weeks. The company oper- ates 50 weeks a year, and the weekly usage rates for both items are normally distributed. The man- ager has gathered the following information about the items:

a. When should the manager reorder each item? b. Compute the order quantity for P34. c. Compute the order quantity for P35 if 110 units are on hand at the time the order is placed.

33. Given the following list of items, a. Classify the items as A, B, or C. b. Determine the economic order quantity for each item (round to the nearest whole unit).

Item P34 Item P35

Average weekly demand 60 units 70 units Standard deviation 4 units per week 5 units per week Unit cost $15 $20 Annual holding cost 30% 30% Ordering cost $70 $30 Lead time 2 weeks 2 weeks Acceptable stockout risk 2.5% 2.5%

Demand (dozens)

Relative Frequency

Demand (dozens)

Relative Frequency

19 .01 25 .10 20 .05 26 .11 21 .12 27 .10 22 .18 28 .04 23 .13 29 .02 24 .14

Item Estimated

Annual Demand Ordering

Cost Holding Cost (%)

Unit Price

H4-010 20,000 50 20 2.50 H5-201 60,200 60 20 4.00 P6-400 9,800 80 30 28.50 P6-401 14,500 50 30 12.00 P7-100 6,250 50 30 9.00 P9-103 7,500 50 40 22.00 TS-300 21,000 40 25 45.00 TS-400 45,000 40 25 40.00 TS-041 800 40 25 20.00 V1-001 33,100 25 35 4.00

34. Demand for jelly doughnuts on Saturdays at Don's Doughnut Shoppe is shown in the following table. Determine the optimal number of doughnuts, in dozens, to stock if labor, materials, and overhead are estimated to be $3.20 per dozen, doughnuts are sold for $4.80 per dozen, and leftover doughnuts at the end of each day are sold the next day at half price. What is the resulting service level?

35. A public utility intends to buy a turbine as part of an expansion plan and must now decide on the number of spare parts to order. One part, no. X135, can be purchased for $100 each. Carrying and disposal costs are estimated to be 145 percent of the purchase price over the life of the turbine. A stockout would cost roughly $88,000 due to downtime, ordering, and “special purchase” factors. Historical records based on the performance of similar equipment operating under similar condi- tions suggest that demand for spare parts will tend to approximate a Poisson distribution with a mean of 3.2 parts for the useful life of the turbine. a. What is the optimal number of spares to order? b. Carrying no spare parts would be the best strategy for what range of shortage cost?

ste24102_ch13_546-603.indd 594ste24102_ch13_546-603.indd 594 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 595

36. Skinner's Fish Market buys fresh Boston bluefish daily for $4.20 per pound and sells it for $5.70 per pound. At the end of each business day, any remaining bluefish is sold to a producer of cat food for $2.40 per pound. Daily demand can be approximated by a normal distribution with a mean of 80 pounds and a standard deviation of 10 pounds. What is the optimal stocking level?

37. A small grocery store sells fresh produce, which it obtains from a local farmer. During the straw- berry season, demand for fresh strawberries can be reasonably approximated using a normal distri- bution with a mean of 40 quarts per day and a standard deviation of 6 quarts per day. Excess costs run 35 cents per quart. The grocer orders 49 quarts per day. a. What is the implied cost of shortage per quart? b. Why might this be a reasonable figure?

38. Demand for devil's food whipped-cream layer cake at a local pastry shop can be approximated using a Poisson distribution with a mean of six per day. The manager estimates it costs $9 to pre- pare each cake. Fresh cakes sell for $12. Day-old cakes sell for $9 each. What stocking level is appropriate if one-half of the day-old cakes are sold and the rest thrown out?

39. Burger Prince buys top-grade ground beef for $1.00 per pound. A large sign over the entrance guarantees that the meat is fresh daily. Any leftover meat is sold to the local high school cafeteria for 80 cents per pound. Four hamburgers can be prepared from each pound of meat. Burgers sell for 60 cents each. Labor, overhead, meat, buns, and condiments cost 50 cents per burger. Demand is normally distributed with a mean of 400 pounds per day and a standard deviation of 50 pounds per day. What daily order quantity is optimal? ( Hint: Shortage cost must be in dollars per pound.)

40. Demand for rug-cleaning machines at Clyde's U-Rent-It is shown in the following table. Machines are rented by the day only. Profit on the rug cleaners is $10 per day. Clyde has four rug-cleaning machines.

Demand Frequency

0 .30 1 .20 2 .20 3 .15 4 .10 5 .05 1.00

Demand 0 1 2 3

Probability .15 .35 .30 .20

Number 0 1 2 3 Probability .10 .50 .25 .15

a. Assuming that Clyde's stocking decision is optimal, what is the implied range of excess cost per machine?

b. Your answer from part a has been presented to Clyde, who protests that the amount is too low. Does this suggest an increase or a decrease in the number of rug machines he stocks? Explain.

c. Suppose now that the $10 mentioned as profit is instead the excess cost per day for each machine and that the shortage cost is unknown. Assuming that the optimal number of machines is four, what is the implied range of shortage cost per machine?

41. A manager is going to purchase new processing equipment and must decide on the number of spare parts to order with the new equipment. The spares cost $200 each, and any unused spares will have an expected salvage value of $50 each. The probability of usage can be described by this distribution:

If a part fails and a spare is not available, two days will be needed to obtain a replacement and install it. The cost for idle equipment is $500 per day. What quantity of spares should be ordered? a. Use the ratio method. b. Use the tabular method (see Table 13.3 ).

42. A Las Vegas supermarket bakery must decide how many wedding cakes to prepare for the upcom- ing weekend. Cakes cost $33 each to make, and they sell for $60 each. Unsold cakes are reduced to half-price on Monday, and typically one-third of those are sold. Any that remain are donated to a nearby senior center. Analysis of recent demand resulted in the following table:

ste24102_ch13_546-603.indd 595ste24102_ch13_546-603.indd 595 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

596 Chapter Thirteen Inventory Management

UPD Manufacturing produces a range of health care appliances for hos- pital as well as for home use. The company has experienced a steady demand for its products, which are highly regarded in the health care field. Recently the company has undertaken a review of its inventory ordering procedures as part of a larger effort to reduce costs.

One of the company's products is a blood pressure testing kit. UPD manufactures all of the components for the kit in-house except for the digital display unit. The display units are ordered at six-week intervals from the supplier. This ordering system began about five years ago, because the supplier insisted on it. However, that supplier was bought out by another supplier about a year ago, and the six-week ordering requirement is no longer in place. Nonetheless, UPD has continued to use the six-week ordering policy. According to purchasing manager Tom Chambers, “Unless somebody can give me a reason for changing, I'm going to stick with what we've been doing. I don't have time to reinvent the wheel.”

Further discussions with Tom revealed a cost of $32 to order and receive a shipment of display units from the supplier. The company assembles 89 kits a week. Also, information from Sara James, in Accounting, indicated a weekly carry- ing cost of $.08 for each display unit.

The supplier has been quite reliable with deliveries; orders are received five working days after they are faxed to the supplier. Tom indi- cated that as far as he was concerned, lead-time variability is virtually nonexistent.

Questions

1. Would using an order interval other than every six weeks reduce costs? If so, what order interval would be best, and what order size would that involve?

2. Would you recommend changing to the optimal order interval? Explain.

CASE UPD Manufacturing

Background Harvey Industries, a Wisconsin company, specializes in the assembly of high- pressure washer systems and in the sale of repair parts for these systems. The products range from small portable high-pressure washers to large industrial installations for snow removal from vehicles stored outdoors during the winter months. Typical uses for high-pressure water cleaning include:

Industrial customers include General Motors, Ford, Chrysler, Delta Airlines, United Parcel Service, and Shell Oil Company.

Although the industrial applications are a significant part of its sales, Harvey Industries is primarily an assembler of equipment for coin oper- ated self-service car wash systems. The typical car wash is of concrete block construction with an equipment room in the center, flanked on either side by a number of bays. The cars are driven into the bays where the owner can wash and wax the car, utilizing high-pressure hot water and liquid wax. A dollar bill changer is available to provide change for the use of the equipment and the purchase of various products from dispens- ers. The products include towels, tire cleaner, and upholstery cleaner.

CASE Harvey Industries

Automobiles Airplanes

Building maintenance Barns

Engines Ice cream plants

Lift trucks Machinery

Swimming pools

(continued )

How many cakes should be prepared to maximize expected profit? a. Use the ratio method. b. Use the tabular method (see Table 13.3 ).

43. Offwego Airlines has a daily flight from Chicago to Las Vegas. On average, 18 ticket holders can- cel their reservations, so the company intentionally overbooks the flight. Cancellations can be described by a normal distribution with a mean of 18 passengers and a standard deviation of 4.55 passengers. Profit per passenger is $99. If a passenger arrives but cannot board due to overbooking, the company policy is to provide a cash payment of $200. How many tickets should be overbooked to maximize expected profit?

ste24102_ch13_546-603.indd 596ste24102_ch13_546-603.indd 596 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 597

In recent years Harvey Industries has been in financial difficulty. The company has lost money for three of the last four years, with the last year's loss being $17,174 on sales of $1,238,674. Inven- tory levels have been steadily increasing to their present levels of $124,324.

The company employs 23 people with the management team consisting of the following key employees: president, sales manager, manufacturing manager, controller, and purchasing manager. The abbreviated organization chart reflects the reporting relationship of the key employees and the three individuals who report directly to the manufacturing manager.

Current Inventory Control System The current inventory control “system” consists of orders for stock replenishment being made by the stockroom foreman, the pur- chasing manager, or the manufacturing manager whenever one of them notices that the inventory is low. An order for replenishment of inventory is also placed whenever someone (either a customer or an employee in the assembly area) wants an item and it is not in stock.

Some inventory is needed for the assembly of the high-pressure equipment for the car wash and industrial applications. There are cur- rent and accurate bills of material for these assemblies. The material needs to support the assembly schedule are generally known well in advance of the build schedule.

The majority of inventory transactions are for repair parts and for supplies used by the car washes, such as paper towels, detergent, and wax concentrate. Because of the constant and rugged use of the

car wash equipment, there is a steady demand for the various repair parts.

The stockroom is well organized, with parts stored in locations according to each vendor. The number of vendors is relatively limited, with each vendor generally supplying many different parts. For exam- ple, the repair parts from Allen Bradley, a manufacturer of electrical motors, are stocked in the same location. These repair parts will be used to provide service for the many electrical motors that are part of the high-pressure pump and motor assembly used by all of the car washes.

Because of the heavy sales volume of repair parts, there are gen- erally two employees working in the stockroom—a stockroom fore- man who reports to the manufacturing manager and an assistant to the foreman. One of these two employees will handle customer orders. Many customers stop by and order the parts and supplies they need. Telephone orders are also received and are shipped by United Parcel Service the same day.

The assembly area has some inventory stored on the shop floor. This inventory consists of low-value items that are used every day, such as nuts, bolts, screws, and washers. These purchased items do not amount to very much dollar volume throughout the year. Unfortunately, oftentimes the assembly area is out of one of these basic items and this causes a significant amount of downtime for the assembly lines.

Paperwork is kept to a minimum. A sales slip listing the part num- bers and quantities sold to a customer is generally made out for each sale. If the assembly department needs items that are not stocked on the assembly floor, someone from that department will enter the stock- room and withdraw the necessary material. There is no paperwork made out for the items needed on the assembly floor.

Manufacturing manager

Sales manager

Purchasing manager

Controller

President

Stockroom foreman

Assembly foreman

Quality engineer

(continued )

ste24102_ch13_546-603.indd 597ste24102_ch13_546-603.indd 597 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

598 Chapter Thirteen Inventory Management

Grill Rite is an old-line company that started out making wooden matches. As that business waned, the company entered the electric barbecue grill market, with five models of grills it sells nationally. For many years the company maintained a single warehouse from which it supplied its distributors.

The plant where the company produces barbecue sets is located in a small town, and many workers have been with the company for many years. During the transition from wooden matches to barbecue grills, many employees gave up their weekends to help with changing over the plant and learning the new skills they would need, without pay. In fact, Mac Wilson, the company president, can reel off a string of such instances of worker loyalty. He has vowed to never lay off any workers, and to maintain a full employment, steady rate of output. “Yes, I know demand for these babies (barbecue grills) is seasonal, but the inven- tory boys will just have to deal with it. On an annual basis, our output matches sales.”

Inventory is handled by a system of four warehouses. There is a central warehouse located near the plant that supplies some customers directly, and the three regional warehouses.

The vice president for sales, Julie Berry, is becoming increas- ingly frustrated with the inventory system that she says “is anti- quated and unresponsive.” She points to increasing complaints from regional sales managers about poor customer service, saying customer orders go unfilled or are late, apparently due to short- ages at the regional warehouse. Regional warehouse managers,

stung by complaints from sales managers, have responded by increasing their order sizes from the main warehouse, and maintaining larger amounts of safety stock. This has resulted in increased inventory holding costs, but it hasn't eliminated the problem. Complaints are still coming in from sales- people about shortages and lost sales. According to managers of the regional warehouses, their orders to the main warehouse aren't being shipped, or when they are, they are smaller quantities than requested. The manager of the main warehouse, Jimmy Joe (“JJ”) Sorely, says his policy is to give preference to “filling direct orders from actual customers, rather than warehouse orders that might simply reflect warehouses trying to replenish their safety stock. And besides, I never know when I'll get hit with an order from one of the regional warehouses. I guess they think we've got an unlimited sup- ply.” Then he adds, “I thought when we added the warehouses, we could just divide our inventory among the warehouses, and every- thing would be okay.”

When informed of the “actual customers” remark, a regional ware- house manager exclaimed, “We're their biggest customer!”

Julie Berry also mentioned that on more than one occasion she has found that items that were out of stock at one regional warehouse were in ample supply in at least one other regional warehouse.

Take the position of a consultant called in by president Mac Wilson. What recommendations can you make to alleviate the problems the company is encountering?

CASE Grill Rite

(concluded)

There were 973 different part numbers purchased for stock last year and those purchases amounted to $314,673. An analysis of inventory records shows that $220,684 was spent on just 179 of the part numbers.

Fortunately for Harvey Industries, most of the items they purchase are stocked by either the manufacturer or by a wholesaler. When it is discovered that the company is out of stock on an item, it generally takes only two or three days to replenish the stock.

Due to the company's recent losses, its auditing firm became con- cerned about the company's ability to continue in business. Recently the company sold off excess vacant land adjoining its manufacturing facility to generate cash to meet its financial obligations.

New President Because of the recent death of the owner, the trust department of a Milwaukee bank (as trustee for the state) has taken over the company's affairs and has appointed a new company president. The new president has identified many problem areas—one of which is improper inventory control. He has retained you as a consultant to make specific recom- mendations concerning a revised inventory control system. What are your recommendations and their rationale?

Source: Case “Harvey Industries” by Donald Condit presented at Midwest Case Writer's Association Workshop, 1984. Copyright © 1984 Donald Condit. Reprinted by permission.

ste24102_ch13_546-603.indd 598ste24102_ch13_546-603.indd 598 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 599

Sarah Lubbers and Chris Rusche Farmers Restaurant is a full service restaurant offering a variety of breakfast, lunch, and dinner items. Currently, Kristin Davis is the gen- eral manager for the Farmers Restaurant located in the Grand Rapids/ Wyoming metro area of Michigan. Since becoming manager, Kristin has faced some difficulties with ordering the right amounts of food items for the restaurant. Because of this, there are some weeks the restau- rant has a surplus of menu items that are no longer fresh, and must be discarded. At other times, the restaurant has experienced shortages of some items. The fact that inventory accounts for an average cost of 26% of the restaurant's total revenues underscores the importance of managing inventory. Kristin would like to find a way to ensure that she is maintaining the proper amount of inventory. Customer counts at Kristin's restaurant have been declining recently, so one of Kristin's greatest focuses is to keep current customers and attract new custom- ers. She believes that a key aspect of this is having all of the items on the menu in stock.

The restaurant industry is competitive. In the Grand Rapids/ Wyoming metro area alone there are over 1,600 restaurants. Some of Farmers Restaurant's most serious competitors are IHOP, Applebee's, and Big Boy, all of which are located within 20 miles of the Farm- ers Restaurant, so customers have many alternatives from which to choose.

Online inventory systems are used to assist restaurant managers in determining on-hand inventory and gauging how well the restau- rant is controlling food costs. The fiscal week for Farmers Restaurant starts on Thursday and ends on Wednesday of the following week. Each Wednesday, the manager physically counts the inventory on hand and enters the data into the online inventory system. The com- puter software system then compares the on-hand inventory for that week, the amount of food ordered, and the inventory on hand for the end of the previous week with the sales for the current week. By doing so, it is able to determine a total food cost. The manager compares this cost with the benchmark cost to see how well the restaurant has been managing its inventory. This is one of the most important numbers to managers at the Farmers Restaurant because it accounts for approximately 30% of total costs in terms of a store's cost structure.

The computer software system also compares the total cost of food on hand with the total amount of sales for that week and computes a percentage of on-hand inventories. As a guideline, the company has set a standard of having between 29% and 36% for its on-hand inventory level. The company feels that this level of inventory is an appropriate average to ensure quality food that is fresh and within expiration. Lastly, it is better to keep the inventory at a minimum level to ensure the accuracy and ease of inventory counts.

The Farmers Restaurant Kristin manages has been running above average in terms of food costs. For this reason, her boss has become concerned with the performance of the ordering system she is using at her restaurant. Kristin has been using her intuitition to decide how much product to order despite the fact that the product order sheets provide a moving average usage of each product. Kristin bases her inventory management on her intuition because she does not understand how to utilize the moving average forecasting technique when placing orders. An additional complication with ordering inventory is that each item is packed in multiple quantities, so she cannot order the exact amount that she needs. Her boss requested that she create a more accurate way of ordering food and to report back to him in one month. Kristin is worried that if she cuts inventory levels too low she will run out of products, which may result in a decrease in customer counts.

After Kristin met with her boss, she began to think about what changes she could make. She knows that inventory has been a weak point for her, but she remembers one of her employees talking about inventory management from one of his college courses. Kristin decides to ask the employee if he would be willing to help her try and come up with a better way for her to order products. Kristin tells him how the ordering system works, shows him the ordering form, and relates the above information.

Suppose you have been asked to work with Kristin to improve inven- tory ordering.

Questions

1. Describe the importance of inventory management as it relates to the Farmers Restaurant.

2. What ordering system would be best for this situation? 3. Given the following information, provide an example of how much

of Farmers Sausage Gravy Mix should be ordered. You are doing the order for Thursday. Also, Kristin would like a service level of 95%, and you have found that there is a standard deviation of 3.5 units per week, and a moving average weekly demand of 35 servings. The gravy mix comes in packs of two servings. There are currently three packs in inventory.

4. Given the above information and an on-hand inventory of 12, deter- mine the risk of stock out at the end of initial lead time and at the end of the second lead time. The lead time is 2 days and orders are placed once a week.

5. The supplier Kristin uses is located in Ohio. Why might Kristin con- sider dealing with a nearby supplier instead of the one in Ohio? What reasons might there be for not switching suppliers?

CASE Farmers Restaurant

ste24102_ch13_546-603.indd 599ste24102_ch13_546-603.indd 599 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

600 Chapter Thirteen Inventory Management

Bruegger’s Bagel Bakery makes and sells a variety of bagels, includ- ing plain, onion, poppyseed, and cinnamon raisin, as well as assorted flavors of cream cheese. Bagels are the major source of revenue for the company.

The bagel business is a $3 billion industry. Bagels are very popular with consumers. Not only are they relatively low in fat, they are filling, and they taste good! Investors like the bagel industry because it can be highly profitable: it only costs about $.10 to make a bagel, and they can be sold for $.50 each or more. Although some bagel companies have done poorly in recent years, due mainly to poor management, Brueg- ger’s business is booming; it is number one nationally, with over 450 shops that sell bagels, coffee, and bagel sandwiches for takeout or on- premise consumption. Many stores in the Bruegger’s chain generate an average of $800,000 in sales annually.

Production of bagels is done in batches, according to flavor, with each flavor being produced on a daily basis. Production of bagels at Bruegger’s begins at a processing plant, where the basic ingredients of flour, water, yeast, and flavorings are combined in a special mixing machine. After the dough has been thoroughly mixed, it is transferred to another machine that shapes the dough into individual bagels. Once the bagels have been formed, they are loaded onto refrigerated trucks for shipping to individual stores. When the bagels reach a store, they are unloaded from the trucks and temporarily stored while they rise. The final two steps of processing involve boiling the bagels in a kettle of water and malt for one minute, and then baking the bagels in an oven for approximately 15 minutes.

The process is depicted in the figure. Quality is an important feature of a successful business. Custom-

ers judge the quality of bagels by their appearance (size, shape, and shine), taste, and consistency. Customers are also sensitive to the service they receive when they make their purchases. Bruegger’s devotes careful attention to quality at every stage of operation, from choosing suppliers of ingredients, careful monitoring of ingredients, and keeping equipment in good operating condition to monitoring

output at each step in the process. At the stores, employees are instructed to watch for deformed bagels and to remove them when they find them. (Deformed bagels are returned to a processing plant where they are sliced into bagel chips, packaged, and then taken back to the stores for sale, thereby reducing the scrap rate.) Employees who work in the stores are care- fully chosen and then trained so that they are competent to operate the necessary equipment in the stores and to provide the desired level of service to customers.

The company operates with minimal inventories of raw materials and inventories of partially completed bagels at the plant and very little inventory of bagels at the stores. One reason for this is to maintain a high degree of freshness in the final product by continually supplying fresh product to the stores. A second reason is to keep costs down; minimal inventories mean less space is needed for storage.

Questions

1. Bruegger’s maintains relatively little inventory at either its plants or its retail stores. List the benefits and risks of this policy.

2. Quality is very important to Bruegger’s. a. What features of bagels do customers look at to judge their

quality? b. At what points in the production process do workers check

bagel quality? c. List the steps in the production process, beginning with

purchasing ingredients, and ending with the sale, and state how quality can be positively affected at each step.

3. Which inventory models could be used for ordering the ingredients for bagels? Which model do you think would be most appropriate for deciding how many bagels to make in a given batch?

4. Bruegger’s has bagel-making machines at its plants. Another pos- sibility would be to have a bagel-making machine at each store. What advantages does each alternative have?

OPERATIONS TOUR Bruegger’s Bagel Bakery

(D f d b l

Processing plant A retail store

Mixer

Shaper Kettle Oven

Trays of bagels

FLO UR

ste24102_ch13_546-603.indd 600ste24102_ch13_546-603.indd 600 11/29/13 12:06 AM11/29/13 12:06 AM

Final PDF to printer

Chapter Thirteen Inventory Management 601

PSC designs and produces a variety of laser bar code scanning devices. The products include handheld bar code readers, high-speed fixed- position industrial scanners, and retail checkout scanners as well as a full line of accessories, software, and supplies to support its products. Headquartered in Eugene, Oregon, the company has manufacturing facilities in Eugene and Paris, France, with roughly 1,200 employees worldwide.

Products Bar code scanners are designed for a variety of situations that can involve long-range scanning, reading small bar codes, and perform- ing high-speed scans. They are used extensively in industry, business, and government to manage and control the entire supply chain, which includes suppliers, production, warehousing, distribution, retail sales, and service. Examples of bar code readers include the familiar point- of-sale scanners encountered at supermarkets and other retail stores. They come in a variety of forms, ranging from handheld to built-in models. High-speed, unattended scanners are used for automated material handling and sorting. Typical installations include high- volume distribution centers such as JC Penney's catalog operation and airport baggage handling systems. The company also produces “reader engines” that it supplies to other companies for use in their products. These may be as small as 1.2 cubic inches. One application for an “engine product” is found in lottery ticket validation machines. Use of bar code readers has greatly increased the speed and accu- racy of data collection, resulting in increased productivity, improved production and inventory tracking and control, and improved market information.

Operations Forecasting Forecasting is not a significant activity at PSC due to several factors. There is high standardization of scanner components, which creates stability in usage requirements. Supplier lead times are relatively short, often only a few days. Orders are typically small; 70 percent of all orders are for 10 units or less. There is a fair degree of production flexibility, particularly in terms of product customization. As a result of these factors, the company relies mainly on short-term, moving average forecasts.

Product Design PSC has developed a robust design in many of its products, enabling them to perform effectively under a broad range of operating condi- tions. For example, many of its handheld scanners can operate at temperatures ranging from � 22 � F to 120 � F, and can withstand drops onto concrete surfaces from heights up to six feet and still function. This has enabled the company to offer warranties ranging from 24 to 36 months, far exceeding the industry standard of 3 to 12 months.

Layout PSC has developed an efficient production layout that consists of assembly lines and work centers. The assembly lines handle standardized production and subassemblies and the work cen- ters handle final assembly and customization of products. Assembly lines are U-shaped to facilitate communication among workers. The work centers are designed for production flexibility; they can be recon- figured in about four hours. Work centers are staffed by teams of three to six cross-trained workers who are responsible for an order from start to finish.

The Production Process Production involves a combination of assembly line and batch process- ing that provides high volume and flexibility to customized individual orders. Because of the high standardization among the internal compo- nents of different scanners, many of the subassemblies can be produced on assembly lines. Customization is done primarily on the external por- tion of various products according to customer specification.

The production process for scanner engines is depicted in the pro- cess flowchart shown in the figure. The process begins when an order is received from a customer. The order is then configured according to customer specifications. Next it is entered into the computer to obtain a bill of materials (BOM), and the order is transmitted to production con- trol so that it can be scheduled for production. A “traveler” packet con- taining product specifications and the BOM is created. It will accompany the order throughout the process.

The traveler is sent to the “kitting” area where standard parts and any customized parts are obtained and placed into a bin (“kit”) and then placed in a flow rack until the assigned work center is ready for the job (i.e., a pull system).

The next phase of the process transforms unprogrammed, panelized circuit boards into programmed boards. The boards first pass through a screen printer which uses a stencil to coat the boards with a solder paste. Next the boards pass through a chip mounter which enters val- ues for the smaller, passive components of the circuit board at a rate of 25,000 parts per hour. A second mounter enters values for the larger, programmable components at a rate of 7,000 parts per hour. The slower rate for the larger components is offset by the fact that there are fewer of those components. The process ends up being balanced, and no bottlenecks occur.

The programmed boards move by conveyor to a station for visual inspection. Rejects are returned to the chip mounter area, and boards that pass are sent through an oven to solidify the solder, making the programming permanent. The circuit boards are then removed from the panels and placed into the kit. The kits are then taken to designated work centers for customization and placement in scanner engines.

Work centers typically have builders, computer operators, and a tes- ter. A builder mounts the laser diodes on the circuit board and passes it to a computer operator who downloads the customer specifications

OPERATIONS TOUR PSC, Inc.

Th bl li

(continued )

ste24102_ch13_546-603.indd 601ste24102_ch13_546-603.indd 601 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

602 Chapter Thirteen Inventory Management

Builder mounts laser diodes on circuit boards

Board is transformed into a scanner engine

Tester checks performance & quality

Computer operator mounts optical components & downloads attributes

Technician for repair

Not repaired Repaired

The scanners are packaged and shipped to the customers

Scanner engine is put into a LRG casing

Scanner engines are labeled & serialized

Customer label & PSC serial #

FAIL

PASS

PASSPASS or

FAIL

PASS or

FAIL

FAIL

FAIL

Audit double- checks engines for performance & quality

Returned to original work center for rework

Customer places order

Customer svc rep configures & enters order

BOM

Kitting department assembles parts & creates an order "kit"

Kits are placed into a flow rack for holding until work centers are ready to receive materials

Conveyor belt

Traveler created

Chip mounter #1

Chip mounter #2

Conveyor belt

Conveyor belt

Order transmitted via computer to production control

Unprogrammed / panelized circuit boards are fed into a screen printer

Operator of automated process gathers unprocessed circuit boards

Supervisor reviews flow rack and prepares daily schedules for work centers FAIL:

Return to chip mounter #1

Visual inspection

Oven solidifies circuit board programming

Circuit board depanelized

Circuit board added to kit

PASS

Conveyor belt

PSC Inc. Scanner Engine Production Process Flowchart

PASS or

FAIL

(continued )

ste24102_ch13_546-603.indd 602ste24102_ch13_546-603.indd 602 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

Chapter Thirteen Inventory Management 603

Quality Quality is strongly emphasized at PSC. Employees are trained in qual- ity concepts and the use of quality tools. Training is incorporated on- the-job so that employees can see the practical applications of what they are learning. Employees are responsible for performing in-process quality checks (quality at the source), and to report any defects they discover to their supervisor. Defects are assigned to one of three cat- egories for problem solving:

• Operator/training error. The supervisor notifies a trainer who then provides appropriate retraining.

• Process/equipment problem. The supervisor notifies the manufac- turing engineer who is then responsible for diagnosing the cause and correcting the problem.

• Parts/material problem. The supervisor notifies quality assurance, who then notifies the vendor to correct the problem. Defective parts are either scrapped or returned to the vendor.

Lean Production PSC strives to operate on lean production principles. In addition to emphasizing high levels of quality, production flexibility, low levels of inventories, and having some deliveries come right to the production floor, its organization structure is fairly flat, and it uses a team approach. Still another feature of lean production is that many of PSC's workers are multiskilled. The company encourages employees to master new skills through a pay-for-skill program, and bases hourly pay rates on the number of skills a worker can perform.

Business Strategy The company has developed what it believes is a strong strategy for success. Strategic initiatives include anticipating customer demand for miniaturization and the ability to customize products; expanding its pro- prietary technology; and expanding internationally into Western Europe (now accounts for about 35 percent of sales) and the Pacific Rim (now accounts for about 10 percent of sales). Several plants or groups are ISO certified, which has been important for European sales. The com- pany intends to continue to expand its product lines through acquisition of other companies.

into the microprocessor of the scan engine. The operator also mounts the optical components and adjusts them for the design of the scanner (e.g., long-range scanning). Next, the engine goes to the tester, who checks to make sure that the scanner is capable of reading bar codes and laser characteristics. Engines that fail are sent for repair and later retested. If the engine fails a second time, it is either returned for further repair or scrapped. Engines which pass are placed in an electrostatic bag which protects them from static electricity that could damage the programming.

Engines are then sent to Audit for another check for performance quality.

Engines that pass are incorporated into the final product, a serial number is added, along with a label, and the product is sent to the pack- ing area and then shipped to the customer.

Inventory The company uses a variety of methods for inventory management, and it attempts to minimize the amount of inventory. A computer determines component requirements and generates purchase orders for the com- ponents for each order, and then appropriate orders for various com- ponents from vendors are prepared. However, the company maintains a stock of standard components that are replenished using a reorder point system. The company has adopted point-of-use replenishment for some areas of operations, having deliveries come directly to the pro- duction floor. Finished products are immediately shipped to the cus- tomer, which enhances the company's delivery performance and avoids finished goods inventory.

Suppliers Approximately 40 vendors supply parts and materials to PSC, each of which has been subjected to a multiple-step supplier certification pro- gram that includes the supplier's completing a self-evaluation question- naire; an on-site visit of supplier facilities by a team from PSC made up of people from engineering, purchasing, and operations; a probation period; and rating of products using government MIL-STD 105 specifications. Vendor performance is tracked on product quality, delivery, and service.

When an item is removed from inventory, it is scanned into the com- puter, and this information is transmitted directly to suppliers, along with purchase orders to restock components.

(concluded)

Hopp, Wallace J., and Mark L. Spearman. Factory Physics. 3rd ed. New York: Irwin/McGraw-Hill, 2007.

Muller, Max. Essentials of Inventory Management. 2nd ed. New York: Amacom Books, 2011.

Piasecki, David J. Inventory Management Explained: A Focus on Forecasting, Lot Sizing, Safety Stock, and Ordering. Kenosha, WI: Ops Publishing. 2009.

rfidjournal.com

SELECTED BIBLIOGRAPHY AND FURTHER

READINGS

ste24102_ch13_546-603.indd 603ste24102_ch13_546-603.indd 603 11/14/13 10:57 AM11/14/13 10:57 AM

Final PDF to printer

604

C H A P T E R

14 JIT and Lean Operations

After completing this chapter, you should be able to:

LO14.1 Explain the terms lean operations and JIT.

LO14.2 Describe the main characteristics of lean systems.

LO14.3 List the five principles of the way lean systems function.

LO14.4 List some of the benefits and some of the risks of lean operation.

LO14.5 Describe the Toyota Production System (TPS).

LO14.6 List the three goals of a lean system and explain the importance of each.

LO14.7 List the eight wastes according to lean philosophy.

LO14.8 Identify and briefly discuss the four building blocks of a lean production system.

LO14.9 Describe key lean improvement tools.

LO14.10 Outline considerations for successful conversion from a traditional system to a lean system.

LO14.11 Describe some of the obstacles to lean success.

LEARNING OBJECTIVES

CHAPTER OUTLINE

14.1 Introduction, 606 Characteristics of Lean Systems 606

Benefits and Risks of Lean Systems 607

The Toyota Approach, 607

14.2 Supporting Goals, 609

14.3 Building Blocks, 610 Product Design, 610

Process Design, 611

Personnel/Organizational Elements, 616

Manufacturing Planning and Control, 618

14.4 Lean Tools 627 Value Stream Mapping, 627

Process Improvement Using 5W2H, 628

Lean and Six Sigma, 628

JIT Deliveries and the Supply Chain, 628

Lean and ERP, 629

14.5 Transitioning to a Lean System, 629 Planning a Successful Conversion, 629

Obstacles to Conversion, 629

A Cooperative Spirit, 630

14.6 Lean Services, 630

14.7 JIT II, 633

14.8 Operations Strategy, 633

Case: Level Operations, 637

Operations Tour: Boeing, 638

Supplement: Maintenance, 640

ste24102_ch14_604-639.indd 604ste24102_ch14_604-639.indd 604 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

605

As business organizations strive to maintain competitiveness in an ever-changing global economy, they are increasingly seeking new and better ways of operating. For some, this means changing from the traditional ways of operating to what is now referred to as lean operation. A lean operation is a flexible system of operation that uses considerably fewer resources (i.e., activities, people, inventory, and floor space) than a traditional system. More- over, lean systems tend to achieve greater productivity, lower costs, shorter cycle times, and higher quality than nonlean systems.

Lean systems are sometimes referred to as just-in-time (JIT) systems owing to their highly coordinated activities and delivery of goods that occur just as they are needed. The lean approach was pioneered by Toyota’s founder, Taiichi Ohno, and Shigeo Shingo as a much faster and less costly way of producing automobiles. Following its success, today the lean approach is being applied in a wide range of manufacturing and service operations.

Lean is both a philosophy and a methodology that focuses on eliminating waste (non- value-added activities) and streamlining operations by closely coordinating all activities. Lean systems have three basic elements: They are demand driven, are focused on waste reduction, and have a culture that is dedicated to excellence and continuous improvement.

This chapter describes the lean production approach, including the basic elements of these systems and what it takes to make them work effectively. It also points out the ben- efits of these systems and the potential obstacles that companies may encounter when they attempt to convert from a traditional system to a lean production system.

Lean operation  A flexible system that uses minimal resources and produces high- quality goods or services.

Just-in-time (JIT)  A highly coordinated processing system in which goods move through the system, and services are performed, just as they are needed.

LO14.1 Explain the terms lean operations and JIT.

ste24102_ch14_604-639.indd 605ste24102_ch14_604-639.indd 605 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

606 Chapter Fourteen JIT and Lean Operations

14.1 INTRODUCTION Lean operations began as lean manufacturing in the mid-1900s. It was developed by the Japanese automobile manufacturer Toyota. The development in Japan was influenced by the limited resources available at the time. Not surprisingly, the Japanese were very sensitive to waste and inefficiency. Widespread interest in lean manufacturing occurred after a book about automobile production, The Machine That Changed the World, by James Womack, Daniel Jones, and Daniel Roos, was published in 1990. As described in the book, Toyota’s focus was on the elimination of all waste from every aspect of the process. Waste was defined as anything that interfered with, or did not add value to, the process of producing automobiles.

A stunning example of the potential of lean manufacturing was illustrated by the successful adoption of lean methods in the mid-1980s in a Fremont, California, auto plant. The plant was originally operated by General Motors (GM). However, GM closed the plant in 1982 because of its low productivity and high absenteeism. A few years later the plant was reopened as a joint venture of Toyota and GM, called NUMMI (New United Motor Manufacturing, Inc.). About 80 percent of the former plant workers were rehired, but the white-collar jobs were shifted from directing to supporting workers, and small teams were formed and trained to design, measure, and improve their performance. The result? By 1985 productivity and quality improved dramatically, exceeding all other GM plants, and absenteeism was negligible.

As other North American companies attempted to adopt the lean approach, they began to realize that in order to be successful, they needed to make major organizational and cultural changes. They also recognized that mass production, which emphasizes the efficiency of indi- vidual operations and leads to unbalanced systems and large inventories, was outmoded. Instead, they discovered that lean methods involve demand-based operations, flexible operations with rapid changeover capability, effective worker behaviors, and continuous improvement efforts.

Characteristics of Lean Systems There are a number of characteristics that are commonly found in lean systems. An overview of these will provide a better understanding of lean systems.

Waste reduction —A hallmark of lean systems.

Continuous improvement —Another hallmark; never-ending efforts to improve.

Use of teams —Cross-functional teams, especially for process improvement.

Work cells —Along with cellular layouts allow for better communication and use of people.

Visual controls —Simple signals that enable efficient flow and quick assessment of operations.

High quality —In processes and in output.

Minimal inventory —Excess inventory is viewed as a waste.

Output only to match demand —Throughout the entire system; referred to a “demand pull.”

Quick changeovers —Enables equipment flexibility and output variety without disruption.

Small lot sizes —Enables variety for batch production.

Lean culture —The entire organization embraces lean concepts and strives to achieve them.

Five principles embody the way lean systems function. Note the connections to the preceding characteristics.

Identify customer values.

Focus on processes that create value.

Eliminate waste to create “flow”.

Produce only according to customer demand.

Strive for perfection.

LO14.2 Describe the main characteristics of lean systems.

LO14.3 List the five principles of the way lean systems function.

ste24102_ch14_604-639.indd 606ste24102_ch14_604-639.indd 606 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

Chapter Fourteen JIT and Lean Operations 607

Benefits and Risks of Lean Systems There are numerous benefits of lean systems, as well as some risks. The key benefits include:

Reduced waste due to emphasis on waste reduction.

Lower costs due to reduced waste and lower inventories.

Increased quality motivated by customer focus and the need for high-quality processes.

Reduced cycle time due to elimination of non-value-added operations.

Increased flexibility due to quick changeovers and small lot sizes.

Increased productivity due to elimination of non-value-added processes.

There are also certain risks that often accompany lean operations, such as:

Increased stress on workers due to increased responsibilities for equipment changeovers, problem solving, and process and quality improvement.

Fewer resources (e.g., inventory, people, time) available if problems occur.

Supply chain disruptions can halt operations due to minimal inventory or time buffers.

John Deere, the well-known tractor supply company, bolstered profits during a recession by using a JIT approach to reduce inventory levels. However, when demand picked up as the economy strengthened, a shortage of parts led to stretched-out delivery dates. Long lead times to replenish parts meant that in some cases harvesting equipment farmers wanted wouldn’t be available until after harvest time! As a result, some farmers turned to Deere competitors to purchase needed equipment.

The Toyota Approach Many of the methods that are common to lean operations were developed as part of Japanese car maker Toyota’s approach to manufacturing. Toyota’s approach came to be known as the Toyota Production System (TPS), and it has served as a model for many implementations of lean systems, particularly in manufacturing. Many of the terms Toyota used are now com- monly used in conjunction with lean operations, especially the following:

• Muda : Waste and inefficiency. Perhaps the driving philosophy. Waste and inefficiency can be minimized by using the following tactics.

• Kanban : A manual system used for controlling the movement of parts and materials that responds to signals of the need (i.e., demand) for delivery of parts or materials. This applies both to delivery to the factory and delivery to each workstation. The result is the delivery of a steady stream of containers of parts throughout the workday. Each container holds a small supply of parts or materials. New containers are delivered to replace empty containers.

• Heijunka : Variations in production volume lead to waste. The workload must be leveled; volume and variety must be averaged to achieve a steady flow of work.

• Kaizen : Continuous improvement of the system. There is always room for improvement, so this effort must be ongoing.

• Jidoka : Quality at the source. A machine automatically stops when it detects a bad part. A worker then stops the line. Also known as autonomation.

In some respects, the just-in-time concept was operational over 60 years ago at Henry Ford’s great industrial complex in River Rouge, Michigan.

Toyota learned a great deal from studying Ford’s operations and based its lean approach on what it saw. However, Toyota was able to accomplish something that Ford couldn’t: a system that could handle some variety.

A widely held view of JIT/lean production is that it is simply a system for scheduling production that results in low levels of work-in-process and inventory. But in its truest sense, JIT/lean production represents a philosophy that encompasses every aspect of the

LO14.4 List some of the benefits and some of the risks of lean operation.

LO14.5 Describe the Toyota Production System (TPS).

Muda  Waste and inefficiency.

Kanban  A manual system that signals the need for parts or materials.

Heijunka  Workload leveling.

Kaizen  Continuous improvement of the system.

Jidoka  Quality at the source (autonomation).

ste24102_ch14_604-639.indd 607ste24102_ch14_604-639.indd 607 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

608 Chapter Fourteen JIT and Lean Operations

In recent years Toyota has been plagued by more than a few recalls of its popular vehicles. This was somewhat surprising, given Toyota’s repu- tation as a world leader in quality and lean production. Various news reports pointed to the following as possible causes: overdoing its quest

READING Toyota Recalls

FIGURE 14.1 An overview of the goals and building blocks of lean production systems Source: Adapted from Thomas E. Vollmann, William L. Berry, and D. Clay Whybark, Manufacturing Planning and Control Systems, 5th ed. Copyright 2005 Irwin/ McGraw-Hill Companies, Inc. Used with permission.

Ultimate Goal

Eliminate disruptions Make the system flexible

Eliminate waste

Supporting Goals

Product Design: • Standard parts • Modular design • Quality • Concurrent engineering

Process Design: • Small lot sizes • Setup time reduction • Manufacturing cells • Quality improvement • Production flexibility • A balanced system • Little inventory storage • Fail-safe methods

Personnel/Organizational Elements: • Workers as assets • Cross-trained workers • Continuous improvement • Cost accounting • Leadership/project management

Manufacturing Planning and Control: • Level loading • Pull systems • Visual systems • Limited work-in- process (WIP) • Close vendor relationships • Reduced transaction processing • Preventive maintenance and housekeeping

Building Blocks

A balanced, rapid flow

In the mid-1920s, the Ford assembly plant in River Rouge, Michigan, was a state-of-the-art industrial complex employing over 75,000 workers. In 1982, Eiji Toyoda, head of the Toyota Company, toasted Ford’s then-president Philip Caldwell, saying, “There is no secret to how we learned to do what we do—we learned it at the Rouge.”

for cost reduction; failure to heed early reports of problems and address them, possibly due to a refusal to admit there were problems; and increased difficulty in overseeing the entire system from Japan as overseas sales expanded.

ste24102_ch14_604-639.indd 608ste24102_ch14_604-639.indd 608 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

Chapter Fourteen JIT and Lean Operations 609

process, from design to after the sale of a product. The philosophy is to pursue a system that functions well with minimal levels of inventories, minimal waste, minimal space, and minimal transactions. Truly, a lean system. As such, it must be a system that is not prone to disruptions and is flexible in terms of the product variety and range of volume that it can handle.

In lean systems, quality is ingrained in both the product and the process. Companies that use lean operations have achieved a level of quality that enables them to function with small batch sizes and tight schedules. Lean systems have high reliability; major sources of ineffi- ciency and disruption have been eliminated, and workers have been trained not only to func- tion in the system but also to continuously improve it.

The ultimate goal of a lean operation is to achieve a system that matches supply to customer demand; supply is synchronized to meet customer demand in a smooth, uninterrupted flow. Figure 14.1 provides an overview of the goals and building blocks of a lean production system. The following pages provide more details about the supporting goals and building blocks.

14.2 SUPPORTING GOALS The ultimate goal of lean is a balanced system, that is, one that achieves a smooth, rapid flow of materials and/or work through the system. The idea is to make the process time as short as possible by using resources in the best possible way. The degree to which the overall goal is achieved depends on how well certain supporting goals are achieved. Those goals are to

1. Eliminate disruptions.

2. Make the system flexible.

3. Eliminate waste, especially excess inventory.

Disruptions have a negative influence on the system by upsetting the smooth flow of prod- ucts through the system, and they should be eliminated. Disruptions are caused by a variety of factors, such as poor quality, equipment breakdowns, changes to the schedule, and late deliv- eries. Quality problems are particularly disruptive because in lean systems there is no extra inventory that can be used to replace defective items. All disruptions should be eliminated where possible. This will reduce the uncertainty that the system must deal with.

A flexible system is one that is robust enough to handle a mix of products, often on a daily basis, and to handle changes in the level of output while still maintaining balance and throughput speed. This enables the system to deal with some uncertainty. Long setup times and long lead times negatively impact the flexibility of the system. Hence, reduction of setup and lead times is very important in a lean system.

Waste represents unproductive resources; eliminating waste can free up resources and enhance production. Inventory is an idle resource, taking up space and adding cost to the system. It should be minimized as much as possible. In the lean philosophy, there are eight wastes:

1. Excess inventory —beyond minimal quantities, an idle resource takes up floor space and adds to cost.

2. Overproduction —involves excessive use of manufacturing resources.

3. Waiting time —requires space, adds no value.

4. Unnecessary transporting —increases handling, increases work-in-process inventory.

5. Processing waste —makes unnecessary production steps, scrap.

6. Inefficient work methods —reduce productivity, increase scrap, increase work-in- process inventory.

7. Product defects —require rework costs and possible lost sales due to customer dissatisfaction.

8. Underused people—relates to mental and creative abilities as well as physical abilities.

LO14.6 List the three goals of a lean system and explain the importance of each.

LO14.7 List the eight wastes according to lean philosophy.

ste24102_ch14_604-639.indd 609ste24102_ch14_604-639.indd 609 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

610 Chapter Fourteen JIT and Lean Operations

The existence of these wastes is an indication that improvement is possible. The list of wastes also can identify potential targets for continuous improvement efforts.

The kaizen philosophy for eliminating waste is based on the following tenets: 1

1. Waste is the enemy, and to eliminate waste it is necessary to get the hands dirty.

2. Improvement should be done gradually and continuously; the goal is not big improve- ments done intermittently.

3. Everyone should be involved: top managers, middle managers, and workers.

4. Kaizen is built on a cheap strategy, and it does not require spending great sums on tech- nology or consultants.

5. It can be applied anywhere.

6. It is supported by a visual system: a total transparency of procedures, processes, and values, making problems and wastes visible to all.

7. It focuses attention where value is created.

8. It is process oriented.

9. It stresses that the main effort of improvement should come from new thinking and a new work style.

10. The essence of organizational learning is to learn while doing.

14.3 BUILDING BLOCKS The design and operation of a lean system provide the foundation for accomplishing the aforementioned goals. As shown in Figure 14.1 , the building blocks are:

1. Product design.

2. Process design.

3. Personnel/organizational elements.

4. Manufacturing planning and control.

Speed and simplicity are two common threads that run through these building blocks.

Product Design Four elements of product design are important for a lean production system:

1. Standard parts.

2. Modular design.

3. Highly capable production systems with quality built in.

4. Concurrent engineering.

The first two elements relate to speed and simplicity. The use of standard parts means that workers have fewer parts to deal with, and training

times and costs are reduced. Purchasing, handling, and checking quality are more routine and lend themselves to continual improvement. Another important benefit is the ability to use standard processing.

Modular design is an extension of standard parts. Modules are clusters of parts treated as a single unit. This greatly reduces the number of parts to deal with, simplifying assembly, purchasing, handling, training, and so on. Standardization has the added benefit of reducing the number of different parts contained in the bill of materials for various products, thereby simplifying the bill of materials.

1 Adapted from Jorge Nascimento Rodrigues with Masaaki Imai, “Masaaki Imai: The Father of Kaizen,” www .gurusonline.tv/uk/conteudos/imai.asp .

LO14.8 Identify and briefly discuss the four building blocks of a lean production system.

ste24102_ch14_604-639.indd 610ste24102_ch14_604-639.indd 610 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

Chapter Fourteen JIT and Lean Operations 611

Lean requires highly capable production systems. Quality is the sine qua non (“without which not”) of lean. It is crucial to lean systems because poor quality can create major disrup- tions. Quality must be embedded in goods and processes. The systems are geared to a smooth flow of work; the occurrence of problems due to poor quality creates disruption in this flow. Because of small lot sizes and the absence of buffer stock, production must cease when prob- lems occur, and it cannot resume until the problems have been resolved. Obviously, shutting down an entire process is costly and cuts into planned output levels, so it becomes imperative to try to avoid shutdowns and to quickly resolve problems when they do appear.

Lean systems use a comprehensive approach to quality. Quality is designed into the prod- uct and the production process. High quality levels can occur because lean systems produce standardized products that lead to standardized job methods, employ workers who are very familiar with their jobs, and use standardized equipment. Moreover, the cost of product design quality (i.e., building quality in at the design stage) can be spread over many units, yielding a low cost per unit. It is also important to choose appropriate quality levels in terms of the final customer and of manufacturing capability. Thus, product design and process design must go hand in hand.

Engineering changes can be very disruptive to smooth operations. Concurrent engineering practices (described in Chapter 4) can substantially reduce these disruptions.

Process Design Eight aspects of process design are particularly important for lean production systems:

1. Small lot sizes.

2. Setup time reduction.

3. Manufacturing cells.

4. Quality improvement.

5. Production flexibility.

6. A balanced system.

7. Little inventory storage.

8. Fail-safe methods.

Small Lot Sizes. In the lean philosophy, the ideal lot size is one unit, a quantity that may not always be realistic owing to practical considerations requiring minimum lot sizes (e.g., machines that process multiple items simultaneously, heat-treating equipment that processes multiple items simultaneously, and machines with very long setup times). Nevertheless, the goal is still to reduce the lot size as much as possible. Small lot sizes in both the production process and deliveries from suppliers yield a number of benefits that enable lean systems to operate effectively. First, with small lots moving through the system, in-process inventory is considerably less than it is with large lots. This reduces carrying costs, space requirements, and clutter in the workplace. Second, inspection and rework costs are less when problems with quality occur, because there are fewer items in a lot to inspect and rework.

Small lots also permit greater flexibility in scheduling. Repetitive systems typically pro- duce a small variety of products. In traditional systems, this usually means long production runs of each product, one after the other. Although this spreads the setup cost for a run over many items, it also results in long cycles over the entire range of products. For instance, sup- pose a firm has three product versions, A, B, and C. In a traditional system, there would be a long run of version A (e.g., covering two or three days or more), then a long run of version B, followed by a long run of version C before the sequence would repeat. In contrast, a lean system, using small lots, would frequently shift from producing A to producing B and C. This flexibility enables lean systems to respond more quickly to changing customer demands for output: lean systems can produce just what is needed, when it is needed. The contrast between small and large lot sizes is illustrated in Figure 14.2 . A summary of the benefits of small lot sizes is presented in Table 14.1 .

ste24102_ch14_604-639.indd 611ste24102_ch14_604-639.indd 611 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

612 Chapter Fourteen JIT and Lean Operations

It is important to note that the use of small lot sizes is not in conflict with the economic order quantity (EOQ) approach. Space is at a premium in Japan, making warehousing costs and the cost of space to store extra inventory near manufacturing very high. Also, on-site inventory increases the space between operations, which decreases communications, increases cycle time, and reduces visibility. All of these add to the burden of carrying inventory. So in an EOQ computation, using higher carrying cost, with carrying cost in the denominator, lot sizes naturally end up being smaller, and in some cases, much smaller.

Setup Time Reduction. Small lots and changing product mixes require frequent setups. Unless these are quick and relatively inexpensive, the time and cost to accomplish them can be prohibitive. Moreover, long setup times require holding more inventory than with short setup times. Hence, there is strong emphasis on reducing setup times. In JIT, workers are often trained to do their own setups. Moreover, programs to reduce setup time and cost are used to achieve the desired results; a deliberate effort is required, and workers are usually a valuable part of the process.

FIGURE 14.2 Small versus large-lot run sizes

AAA BBBBBBB CC AAA BBBBBBB CC AAA BBBBBBB CC AAA BBBBBBB CC

Time

Small-lot approach

AAAAAAAAAAAA BBBBBBBBBBBBBBBBBBBBBBBBB CCCCCCCCC AAAAAAAAAAA

Time

Large-lot approach

A = units of product A B = units of product B C = units of product C

Reduced inventory, lower carrying costs Less space required to store inventory Less rework if defects occur Less inventory to “work off” before implementing product improvements Increased visibility of problems Increased production flexibility Increased ease of balancing operations

TABLE 4.1 Benefits of small lot sizes

Karen Mills MINNEAPOLIS—When General Mills wanted to cut the time it takes to make a product changeover at a Betty Crocker plant, it turned to NASCAR for help. The food company sent a team to work with a pit crew “because nobody can change over a car faster than these guys can,” said Randy Darcy, senior vice president of General Mills’ supply chain operations.

After studying the NASCAR crew, General Mills cut to 12 minutes— from as long as 412 hours—the time it takes to switch production

READING General Mills Turns to NASCAR to Reduce Changeover Time

Shigeo Shingo made a very significant contribution to lean operation with the development of what is called the single-minute exchange of die (SMED) system for reducing change- over time. It involves first categorizing changeover activities as either “internal” or “exter- nal” activities. Internal activities are those that can only be done while a machine is stopped (i.e., not running). Hence, they contribute to long changeover times. External activities are those that do not involve stopping the machine; they can be done before or after the changeover.

Single-minute exchange of die (SMED)  A system for reducing changeover time.

lines from one Betty Crocker meal to another. One thing the mechanics learned from working with the NASCAR pit crew was to videotape each of the changeovers, then critique everything that happened.

Source: Excerpted from Karen Mills, “General Mills Looks Outside the Box for Innovation.” Copyright © The Associated Press. Used with permission.

ste24102_ch14_604-639.indd 612ste24102_ch14_604-639.indd 612 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

Chapter Fourteen JIT and Lean Operations 613

Hence, they do not affect changeover time. After activities have been categorized, a simple approach to achieving quick changeovers is to convert as many internal activities as possible to external activities and then streamline the remaining internal activities.

The potential benefits that can be achieved using the SMED system were impressively illustrated in 1982 at Toyota, when the changeover time for a machine was reduced from 100 minutes to 3 minutes! The principles of the SMED system can be applied to any change- over operation.

Setup tools and equipment and setup procedures must be simple and standardized. Multi- purpose equipment or attachments can help to reduce setup time. For instance, a machine with multiple spindles that can easily be rotated into place for different job requirements can dras- tically reduce job changeover time. Moreover, group technology (described in Chapter 6) may be used to reduce setup cost and time by capitalizing on similarities in recurring operations. For instance, parts that are similar in shape, materials, and so on, may require very similar set- ups. Processing them in sequence on the same equipment can reduce the need to completely change a setup; only minor adjustment may be necessary.

Manufacturing Cells. One characteristic of lean production systems is multiple manufacturing cells. The cells contain the machines and tools needed to process families of parts having similar processing requirements. In essence, the cells are highly specialized and efficient production centers. Among the important benefits of manufacturing cells are reduced changeover times, high utilization of equipment, and ease of cross-training operators.

Quality Improvement. The occurrence of quality defects during the process can disrupt the orderly flow of work. Consequently, problem solving is important when defects occur. Moreover, there is a never-ending quest for quality improvement, which often focuses on finding and eliminating the causes of problems so they do not continually crop up.

Lean production systems sometimes minimize defects through the use of autonomation (note the extra syllable on in the middle of the word). Also referred to as jidoka, it involves the automatic detection of defects during production. It can be used with machines or manual operations. It consists of two mechanisms: one for detecting defects when they occur and another for a human stopping production to correct the cause of the defects. Thus, the halting of production forces immediate attention to the problem, after which an investigation of the problem is conducted, and corrective action is taken to resolve the problem.

Autonomation  Automatic detection of defects during production.

A worker is assembling a Louis Vuitton handbag at the company’s fine leather goods factory in the Normany town of Ducey in France. To keep its brand exclusive and contain costs, the company monitors growth and incorporates lean production processes.

ste24102_ch14_604-639.indd 613ste24102_ch14_604-639.indd 613 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

614 Chapter Fourteen JIT and Lean Operations

Work Flexibility. The overall goal of a lean system is to achieve the ability to process a mix of products or services in a smooth flow. One potential obstacle to this goal is bottlenecks that occur when portions of the system become overloaded. The existence of bottlenecks reflects inflexibilities in a system. Process design can increase production flexibility and reduce bottle- necks in a variety of ways. Table 14.2 lists some of the techniques used for this purpose.

A Balanced System. Line balancing of production lines (i.e., distributing the workload evenly among workstations) helps to achieve a rapid flow of work through the system. Time needed for work assigned to each workstation must be less than or equal to the cycle time. The cycle time is set equal to what is referred to as the takt time. ( Takt is the German word for musical meter.) Takt time is the cycle time needed in a production system to match the pace of produc- tion to the demand rate. It is sometimes said to be the heartbeat of a lean production system.

Takt time is often set for a work shift. The procedure for obtaining the takt time is:

1. Determine the net time available per shift by subtracting any nonproductive time from total shift time.

2. If there is more than one shift per day, multiply the net time per shift by the number of shifts to obtain the net available time per day.

3. Compute takt time by dividing the net available time by demand.

Takt time  The cycle time needed to match customer demand for final product.

S O L U T I O N 1. Compute net time available per shift: Total time 480 minutes

Rest breaks �40 minutes

Lunch �30 minutes

410 minutes per shift 2. Compute the net time available per day:

410 minutes per shift

2 shifts/day

820 minutes per day

3. Compute the takt time:

Takt time

Net time available per day

Daily demand

820 minutes per day

80 units per day

10.25 minutes per cycle

� �

(14–1)

E X A M P L E 1 Given the following information, compute the takt time: Total time per shift is 480 minutes per day, and there are two shifts per day. There are two 20-minute rest breaks and a 30-minute lunch break per shift. Daily demand is 80 units. e celx

mhhe.com/stevenson12e

1. Reduce downtime due to changeovers by reducing changeover time. 2. Use preventive maintenance on key equipment to reduce breakdowns and downtime. 3. Cross-train workers so they can help when bottlenecks occur or other workers are absent. Train workers

to handle equipment adjustments and minor repairs. 4. Use many small units of capacity; many small cells make it easier to shift capacity temporarily and to

add or subtract capacity than a few units of large capacity. 5. Use offline buffers. Store infrequently used safety stock away from the production area to decrease con-

gestion and to avoid continually turning it over. 6. Reserve capacity for important customers.

Source: Adapted from Edward M. Knod Jr. and Richard J. Schonberger, Operations Management: Meeting Customers’ Demands, 7th ed. (New York: McGraw-Hill, 2001)

TABLE 14.2 Guidelines for increasing production flexibility

ste24102_ch14_604-639.indd 614ste24102_ch14_604-639.indd 614 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

Chapter Fourteen JIT and Lean Operations 615

Once the takt time for the system has been determined, it can be used to determine the time that should be allotted to each workstation in the production process. Using the takt time results in minimizing work-in-process (WIP) inventory in instances where demand is stable and the system capacity matches demand. For unstable demand, additional inventory is needed to offset demand variability.

Inventory Storage. Lean systems are designed to minimize inventory storage. Recall that in the lean philosophy, inventory storage is a waste. Inventories are buffers that tend to cover up recurring problems that are never resolved, partly because they aren’t obvious and partly because the presence of inventory makes them seem less serious. When a machine breaks down, it won’t disrupt the system if there is a sufficient inventory of the machine’s output to feed into the next workstation. The use of inventory as the “solu- tion” can lead to increasing amounts of inventory if breakdowns increase. A better solution is to investigate the causes of machine breakdowns and focus on eliminating them. Similar problems with quality, unreliable vendors, and scheduling also can be solved by having ample inventories to fall back on. However, carrying all that extra inventory creates a tremen- dous burden in cost and space and allows problems to go unresolved.

The lean approach is to pare down inventories gradually in order to uncover the problems. Once they are uncovered and solved, the sys- tem removes more inventory, finds and solves additional problems, and so on. A useful analogy is a boat on a pond that has large, hidden rocks. (See Figure  14.3 .) The rocks repre- sent problems that can hinder pro- duction (the boat). The water in the pond that covers the rocks is the inventory in the system. As the water

A worker attaches wheels and hubcaps to a GM Montana Sport pick-up truck on an assembly line in Brazil.

FIGURE 14.3 Large rocks (problems) are hidden by a high water level (inventory) in A. Lower water level (B) reveals rocks (problems such as bottlenecks, waste, poor timing). Once the large rocks are removed, the water level (inventory) can be lowered (C). This process would be done repeatedly in the spirit of continuous improvement, achieving additional improvements with each iteration.

B CA

ste24102_ch14_604-639.indd 615ste24102_ch14_604-639.indd 615 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

616 Chapter Fourteen JIT and Lean Operations

level is slowly lowered, the largest rocks are the first to appear (those problems are the first to be identified). At that point, efforts are undertaken to remove these rocks from the water (resolve these problems). Once that has been accomplished, additional water is removed from the pond, revealing the next layer of rocks, which are then worked on. As more rocks are removed, the need for water to cover them diminishes. Likewise, as more of the major pro- duction problems are solved, there is less need to rely on inventory or other buffers.

Low inventories are the result of a process of successful problem solving, one that has occurred over time. Furthermore, because it is unlikely that all problems will be found and resolved, it is necessary to be able to deal quickly with problems when they do occur. Hence, there is a continuing need to identify and solve problems within a short time span to prevent new problems from disrupting the smooth flow of work through the system.

One way to minimize inventory storage in a lean system is to have deliveries from suppliers go directly to the production floor, which completely eliminates the need to store incoming parts and materials. At the other end of the process, completed units are shipped out as soon as they are ready, which minimizes storage of finished goods. Cou- pled with low work-in-process inventory, these features result in systems that operate with very little inventory.

Among the advantages of lower inventory are less carrying cost, less space needed, less tendency to rely on buffers, less rework if defects occur, and less need to “work off” current inventory before implementing design improvements. But carrying less inventory also has some risks: The primary one is that if problems arise, there is no safety net. Another is missed opportunities if the system is unable to respond quickly to them.

Fail-Safe Methods. Failsafing refers to building safeguards into a process to reduce or eliminate the potential for errors during a process. The term that was used initially was baka-yoke, which meant “foolproofing.” However, due to its offensive connotation, the term was changed to poka-yoke, which means “mistake proofing.” Some examples of failsafing include an alarm that sounds if the weight of a packaged item is too low, indi- cating missing components; putting assembly components in “egg cartons” to ensure that no parts are left out; and designing parts that can only be attached in the correct position. There are several everyday examples in vehicles, including signals that warn that the key is still in the ignition if the car door is opened, warn if a door is ajar, warn if seatbelts are not fastened, or warn if the fuel level is low. Other examples include an ATM signal if a card is left in a machine, detectors at department stores that signal if a monitoring tag hasn’t been removed from an item, electrical fuses and circuit breakers that interrupt electrical supply if a circuit is overloaded, computers and other devices that won’t oper- ate if an incorrect password is used, and so on. Much of the credit for poka-yoke thinking is attributed to the work of Shigeo Shingo, who extensively promoted the use of failsafing in operations.

Personnel/Organizational Elements There are five elements of personnel and organization that are particularly important for lean systems:

1. Workers as assets.

2. Cross-trained workers.

3. Continuous improvement.

4. Cost accounting.

5. Leadership/project management.

Workers as Assets. A fundamental tenet of the lean philosophy is that workers are assets. Well-trained and motivated workers are the heart of a lean system. They are given more authority to make decisions than their counterparts in more traditional systems, but they are also expected to do more.

Poka-yoke  Safeguards built into a process to reduce the possibility of errors.

ste24102_ch14_604-639.indd 616ste24102_ch14_604-639.indd 616 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

Chapter Fourteen JIT and Lean Operations 617

Companies that treat employees as valuable assets, invest in training programs and use innovative workplace practices are more profitable than those that don’t, a study found.

The two-year look at the workplace strategies of American compa- nies was conducted by the management consulting firm Ernst & Young LLP for the Labor Department.

“This is a path-breaking study that shows the surest way to profits and productivity is to treat employees as assets to be developed rather than costs to be cut,” Labor Secretary Robert Reich said at a press conference.

For the study, researchers at Harvard and Wharton business schools in partnership with the Ernst & Young Center for Business Innovation, reviewed over 100 papers examining business practices of thousands of U.S. companies.

The report focused on the economic benefits to companies of such Japanese-inspired concepts of labor-management cooperation as Just- In-Time inventory, which moves components to factories only as they are needed.

READING “People” Firms Boost Profits, Study Shows

The Andon board in the GM Powertrain Engine facility is a visual communication tool. It advises employees of the real- time status of each machine within the manufacturing lines, enabling the production system to be run more effectively.

Among the findings:

• Economic benefits to companies were greatest when they successfully integrated innovations in management and technology with the appropriate employee training and “empower- ment” programs.

• Companies investing in employee development enjoy significantly higher market values on average than their industry peers.

• Companies that were first among their competitors in implementing new management practices reaped the largest rewards.

According to the study, Motorola, Inc. estimates it earns $30 for every $1 invested in employee training, while Xerox Corp. found that in cooperation with its employee union it has reduced manufactur- ing costs by 30 percent and halved the time needed to develop new products.

Source: “People Firms Boost Profits, Study Shows.” Copyright © 1995, The Associated Press. Used with permission.

Cross-Trained Workers. Workers are cross-trained to perform several parts of a process and operate a variety of machines. This adds to system flexibility because workers are able to help one another when bottlenecks occur or when a coworker is absent. It also helps line balancing.

Continuous Improvement. Workers in a lean system have greater responsibility for qual- ity than workers in traditional systems, and they are expected to be involved in problem solv- ing and continuous improvement. Lean system workers receive extensive training in statistical process control, quality improvement, and problem solving.

Problem solving is a cornerstone of any lean system. Of interest are problems that inter- rupt, or have the potential to interrupt, the smooth flow of work through the system. When such problems surface, it becomes important to resolve them quickly. This may entail increas- ing inventory levels temporarily while the problem is investigated, but the intent of problem solving is to eliminate the problem, or at least greatly reduce the chances of it recurring.

ste24102_ch14_604-639.indd 617ste24102_ch14_604-639.indd 617 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

618 Chapter Fourteen JIT and Lean Operations

Problems that occur during production must be dealt with quickly. Some companies use a light system to signal problems; in Japan, such a system is called andon. Each workstation is equipped with a set of three lights. A green light means no problems, an amber light means a worker is falling a little bit behind, and a red light indicates a serious problem. The purpose of the light system is to keep others in the system informed and to enable workers and supervi- sors to immediately see when and where problems are occurring.

Japanese companies have been very successful in forming teams composed of workers and managers who routinely work on problems. Moreover, workers are encouraged to report problems and potential problems to the teams.

It is important that all levels of management actively support and become involved in problem solving. This includes a willingness to provide financial support and to recognize achievements. It is desirable to formulate goals with the help of workers, publicize the goals, and carefully document accomplishments. Goals give workers something tangible to strive for; recognition can help maintain worker interest and morale.

A central theme of a true lean approach is to work toward continual improvement of the system—reducing inventories, reducing setup cost and time, improving quality, increasing the output rate, and generally cutting waste and inefficiency. Toward that end, problem solving becomes a way of life—a “culture” that must be assimilated into the thinking of management and workers alike. It becomes a never-ending quest for improving operations as all members of the organization strive to improve the system.

One challenge to continuous improvement is that once the “easy” improvements have been made, it becomes more difficult to keep workers motivated to continue to look for further improvements.

Workers in lean systems have more stress than their counterparts in more traditional sys- tems. Stress comes not only from their added authority and responsibility but also from the high-paced system they work in, where there is little slack and a continual push to improve.

Cost Accounting. Another feature of some lean systems is the method of allocating over- head. Traditional accounting methods sometimes distort overhead allocation because they allocate it on the basis of direct labor hours. However, that approach does not always accu- rately reflect the consumption of overhead by different jobs. In addition, the number of direct labor hours in some industries has declined significantly over the years and now frequently accounts for a relatively small portion of the total cost. Conversely, other costs now represent a major portion of the total cost. Therefore, labor-intensive jobs (i.e., those that use relatively large proportions of direct labor) may be assigned a disproportionate share of overhead, one that does not truly reflect actual costs. That in turn can cause managers to make poor deci- sions. Furthermore, the need to track direct labor hours can itself involve considerable effort.

One alternative method of allocating overhead is activity-based costing. This method is designed to more closely reflect the actual amount of overhead consumed by a particular job or activity. Activity-based costing first identifies traceable costs and then assigns those costs to various types of activities such as machine setups, inspection, machine hours, direct labor hours, and movement of materials. Specific jobs are then assigned overhead based on the per- centage of activities they consume.

Leadership/Project Management. Another feature of lean systems relates to leader- ship. Managers are expected to be leaders and facilitators, not order givers. Lean encourages two-way communication between workers and managers.

Manufacturing Planning and Control Seven elements of manufacturing planning and control are particularly important for lean systems:

1. Level loading.

2. Pull systems.

3. Visual systems.

Andon  System of lights used at each workstation to signal prob- lems or slowdowns.

Activity-based costing   Allocation of overhead to specific jobs based on their percentage of activities.

ste24102_ch14_604-639.indd 618ste24102_ch14_604-639.indd 618 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

Chapter Fourteen JIT and Lean Operations 619

4. Limited work-in-process (WIP).

5. Close vendor relationships.

6. Reduced transaction processing.

7. Preventive maintenance and housekeeping.

Level Loading. Lean systems place a strong emphasis on achieving stable, level daily mix schedules. Toward that end, the master production schedule is developed to provide level capacity loading. That may entail a rate-based production schedule instead of the more famil- iar quantity-based schedule. Moreover, once established, production schedules are relatively fixed over a short time horizon, and this provides certainty to the system. Even so, some adjustments may be needed in day-to-day schedules to achieve level capacity requirements. Suppliers like level loading because it means smooth demand for them.

A level production schedule requires smooth production. When a company produces dif- ferent products or product models, it is desirable to produce in small lots (to minimize work- in-process inventory and to maintain flexibility) and to spread the production of the different products throughout the day to achieve smooth production. The extreme case would be to pro- duce one unit of one product, then one of another, then one of another, and so on. While this approach would allow for maximum smoothness, it would generally not be practical because it would generate excessive setup costs.

Mixed-model sequencing begins with daily production requirements of each product or model. For instance, suppose a department produces three models, A, B, and C, with these daily requirements:

Three issues then need to be resolved. One is which sequence to use (C-B-A, A-C-B, etc.), another is how many times (i.e., cycles) the sequence should be repeated daily, and the third is how many units of each model to produce in each cycle.

The choice of sequence can depend on several factors, but the key one is usually the setup time or cost, which may vary depending on the sequence used. For instance, if two of the models, say A and C, are quite similar, the sequences A-C and C-A may involve only minimal setup changes, whereas the setup for model B may be more extensive. Choosing a sequence that has A-C or C-A will result in about 20 percent fewer setups over time than having B pro- duced between A and C on every cycle.

The number of cycles per day depends on the daily production quantities. If every model is to be produced in every cycle, which is often the goal, determining the smallest integer that can be evenly divided into each model’s daily quantity will indicate the number of cycles. This will be the fewest number of cycles that will contain one unit of the model with the low- est quantity requirements. For models A, B, and C shown in the preceding table, there should be five cycles (5 can be evenly divided into each quantity). High setup costs may cause a man- ager to use fewer cycles, trading off savings in setup costs and level production. If dividing by the smallest daily quantity does not yield an integer value for each model, a manager may opt for using the smallest production quantity to select a number of cycles, but then produce more of some items in some cycles to make up the difference.

Sometimes a manager determines the number of units of each model in each cycle by dividing each model’s daily production quantity by the number of cycles. Using five cycles per day would yield the following:

Model Daily Quantity

A 10

B 15 C 5

Model Daily Quantity Units per Cycle

A 10 10/5  �  2

B 15 15/5  �  3

C 5 5/5  �  1

ste24102_ch14_604-639.indd 619ste24102_ch14_604-639.indd 619 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

620 Chapter Fourteen JIT and Lean Operations

These quantities may be unworkable due to restrictions on lot sizes. For example, model B may be packed four to a carton, so producing three units per cycle would mean that at times finished units (inventory) would have to wait until sufficient quantities were available to fill a crate. Similarly, there may be standard production lot sizes for some operations. A heat- treating process might involve a furnace that can handle six units at a time. If the different models require different furnace temperatures, they could not be grouped. What would be necessary here is an analysis of the trade-off between furnace lot size and the advantages of level production.

Determine a production plan for these three models using the sequence A-B-C:

Model Daily Quantity

A 7

B 16

C 5

E X A M P L E 2

S O L U T I O N The smallest daily quantity is 5, but dividing the other two quantities by 5 does not yield inte- gers. The manager might still decide to use five cycles. Producing one unit of models A and C and three units of model B in each of the five cycles would leave the manager short two units of model A and one unit of model B. The manager might decide to intersperse those units like this to achieve nearly level production:

Cycle 1 2 3 4 5

Pattern A B(3) C A(2) B(3) C A B(4) C A(2) B(3) C A B(3) C

Extra unit(s) A B A

If the requirement for model A had been 8 units a day instead of 7, the manager might decide to use the following pattern:

Cycle 1 2 3 4 5

Pattern A(2) B(3) C A B(3) C A(2) B(4) C A B(3) C A(2) B(3) C

Extra unit(s) A A B A

Pull Systems. The terms push and pull are used to describe two different systems for moving work through a production process. In traditional production environments, a push system is used: When work is finished at a workstation, the output is pushed to the next sta- tion; or, in the case of the final operation, it is pushed on to final inventory. Conversely, in a pull system, control of moving the work rests with the following operation; each workstation pulls the output from the preceding station as it is needed; output of the final operation is pulled by customer demand or the master schedule. Thus, in a pull system, work moves on in response to demand from the next stage in the process, whereas in a push system, work moves on as it is completed, without regard to the next station’s readiness for the work. Consequently, work may pile up at workstations that fall behind schedule because of equipment failure or the detection of a problem with quality.

Communication moves backward through the system from station to station. Each workstation (i.e., customer) communicates its need for more work to the preceding work- station (i.e., supplier), thereby assuring that supply equals demand. Work moves “just in time” for the next operation; the flow of work is thereby coordinated, and the accumula- tion of excessive inventories between operations is avoided. Of course, some inventory is usually present because operations are not instantaneous. If a workstation waited until

Push system  Work is pushed to the next station as it is completed.

Pull system  A workstation pulls output from the preceding station as it is needed.

ste24102_ch14_604-639.indd 620ste24102_ch14_604-639.indd 620 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

Chapter Fourteen JIT and Lean Operations 621

it received a request from the next workstation before starting its work, the next station would have to wait for the preceding station to perform its work. Therefore, by design, each workstation produces just enough output to meet the (anticipated) demand of the next station. This can be accomplished by having the succeeding workstation communicate its need for input sufficiently ahead of time to allow the preceding station to do the work. Or there can be a small buffer of stock between stations; when the buffer decreases to a certain level, this signals the preceding station to produce enough output to replenish the buffer supply. The size of the buffer supply depends on the cycle time at the preceding worksta- tion. If the cycle time is short, the station will need little or no buffer; if the cycle time is long, it will need a considerable amount of buffer. However, production occurs only in response to usage of the succeeding station; work is still pulled by the demand generated by the next operation.

Pull systems aren’t necessarily appropriate for all manufacturing operations because they require a fairly steady flow of repetitive work. Large variations in volume, product mix, or product design will undermine the system.

Visual Systems. In a pull system work flow is dictated by “next-step demand.” A system can communicate such demand in a variety of ways, including a shout or a wave, but by far the most commonly used device is the kanban card. Kanban is a Japanese word meaning “signal” or “visible record.” When a worker needs materials or work from the preceding sta- tion, he or she uses a kanban card. In effect, the kanban card is the authorization to move or work on parts. In kanban systems, no part or lot can be moved or worked on without one of these cards.

There are two main types of kanbans:

1. Production kanban (p-kanban): signals the need to produce parts.

2. Conveyance kanban (c-kanban): signals the need to deliver parts to the next work center.

The system works this way: A kanban card is affixed to each container. When a worksta- tion needs to replenish its supply of parts, a worker goes to the area where these parts are stored and withdraws one container of parts. Each container holds a predetermined quantity. The worker removes the kanban card from the container and posts it in a designated spot

Kanban  Card or other device that communicates demand for work or materials from the preceding station.

At TriState Industries, a kanban system is in effect to move work through the production system. Shown here, a kanban card provides the authorization to move or work on parts.

Special carts were designed that, when filled, act as a visual signal that they are ready to be moved to the next work cell. An empty cart indicates that it is time to produce, in order to refill the cart.

ste24102_ch14_604-639.indd 621ste24102_ch14_604-639.indd 621 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

622 Chapter Fourteen JIT and Lean Operations

where it will be clearly visible, and the worker moves the container to the workstation. The posted kanban is then picked up by a stock person who replenishes the stock with another container, and so on down the line. Demand for parts triggers a replenishment, and parts are supplied as usage dictates. Similar withdrawals and replenishments—all controlled by kan- bans—occur all the way up and down the line from vendors to finished-goods inventories. If supervisors decide the system is too loose because inventories are building up, they may decide to tighten the system and withdraw some kanbans. Conversely, if the system seems too tight, they may introduce additional kanbans to bring the system into balance. Vendors also can influence the number of containers. Moreover, trip times can affect the number: Longer trip times may lead to fewer but larger containers, while shorter trip times may involve a greater number of small containers.

It is apparent that the number of kanban cards in use is an important variable. One can compute the ideal number of kanban cards using this formula:

N DT X

C

(1 ) �

� (14–2)

where

N   �  Total number of containers (1 card per container)

D   �  Planned usage rate of using work center

T   �   Average waiting time for replenishment of parts plus average production time for a container of parts

X   �   Policy variable set by management that reflects possible inefficiency in the system (the closer to 0, the more efficient the system)

C   �   Capacity of a standard container (should be no more than 10 percent of daily usage of the part)

Note that D and T must use the same units (e.g., minutes, days).

Usage at a work center is 300 parts per day, and a standard container holds 25 parts. It takes an average of .12 day for a container to complete a circuit from the time a kanban card is received until the container is returned empty. Compute the number of kanban cards (contain- ers) needed if X   �  .20.

E X A M P L E 3

S O L U T I O N

N

D

T

C

X

N

?

300 parts per day

.12 day

25 parts per container

.20

300(.12)(1 .20)

25 1.728; round to 2 containers

� �

Note: Rounding up will cause the system to be looser, and rounding down will cause it to be tighter. Usually, rounding up is used.

Although the goals of MRP and kanban are essentially the same (i.e., to improve customer service, reduce inventories, and increase productivity), their approaches are different. Neither MRP nor kanban is a stand-alone system—each exists within a larger framework. MRP is a computerized system; kanban is a manual system that may be part of a lean system, although lean can exist without kanban.

ste24102_ch14_604-639.indd 622ste24102_ch14_604-639.indd 622 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

Chapter Fourteen JIT and Lean Operations 623

Kanban is essentially a two-bin type of inventory: Supplies are replenished semiautomati- cally when they reach a predetermined level. MRP is more concerned with projecting require- ments and with planning and scheduling operations.

A major benefit of the kanban system is its simplicity; a major benefit of MRP is its abil- ity to handle complex planning and scheduling. In addition, MRP II enables management to answer what-if questions for capacity planning.

The philosophies that underlie kanban systems are quite different from those tradition- ally held by manufacturers. Nonetheless, both approaches have their merits, so it probably would not make sense in most instances to switch from one method of operation to the other. Moreover, to do so would require a tremendous effort. It is noteworthy that at the same time that Western manufacturers are studying kanban systems, some Japanese manufacturers are studying MRP systems. This suggests the possibility that either system could be improved by incorporating selected elements of the other. That would take careful analysis to determine which elements to incorporate as well as careful implementation of selected elements, and close monitoring to assure that intended results were achieved.

Whether manufacturers should adopt the kanban method is debatable. Some form of it may be useful, but kanban is merely an information system; by itself it offers little in terms of helping manufacturers become more competitive or productive. By the same token, MRP alone will not achieve those results either. Instead, it is the overall approach to manufacturing that is crucial; it is the commitment and support of top management and the continuing efforts of all levels of management to find new ways to improve their manufacturing planning and control techniques, and to adapt those techniques to fit their particular circumstances, that will determine the degree of success.

Comment The use of either kanban or MRP does not preclude the use of the other. In fact, it is not unusual to find the two systems used in the same production facility. Some Japanese manufac- turers, for example, are turning to MRP systems to help them plan production. Both approaches have their advantages and limitations. MRP systems provide the capability to explode the bill of materials to project timing and material requirements that can then be used to plan production. But the MRP assumption of fixed lead times and infinite capacity can often result in significant problems. At the shop floor level, the discipline of a kanban system, with materials pull, can be very effective. But kanban works best when there is a uniform flow through the shop; a variable flow requires buffers, and this reduces the advantage of a pull system.

In effect, some situations are more conducive to a visual approach, others to an MRP approach. Still others can benefit from a hybrid of the two. Hybrid systems like kanban/ MRP can be successful if MRP is used for planning and kanban is used as the execution system.

Limited Work-in-Process (WIP). Movement of materials and WIP in a lean system is carefully coordinated, so that they arrive at each step in a process just as they are needed. Con- trolling the amount of WIP in a production system can yield substantial benefits. One is lower carrying costs due to lower WIP inventory. Another is the increased flexibility that would be lost if there were large amounts of WIP in the system. In addition, low WIP aids scheduling and saves costs of rework and scrapping if there are design changes.

Controlling WIP also results in low cycle-time variability. WIP is determined by cycle time and the arrival rate of jobs. According to Little’s law, WIP  �  Cycle time  �  Arrival rate. If both WIP and the arrival rate of jobs are held constant, the cycle time will also be constant. In a push system, the arrival rate of jobs is not held constant, so there is the possibility of large WIP buildups, which results in high variability in cycle times. This forces companies to quote longer lead times to customers to allow for variable cycle times.

There are two general approaches to controlling WIP; one is kanban and the other is con- stant work-in-process (CONWIP). Kanban’s control of WIP focuses on individual worksta- tions, while CONWIP’S focus is on the system as a whole. With CONWIP, when a job exits the system, a new job is allowed to enter. This results in a constant level of work-in-process.

Kanban works best in an environment that is stable and predictable. CONWIP offers an advantage if there is variability in a line, perhaps due to a breakdown in an operation or

ste24102_ch14_604-639.indd 623ste24102_ch14_604-639.indd 623 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

624 Chapter Fourteen JIT and Lean Operations

a quality problem. With kanban, upstream work is blocked and processing will stop fairly quickly, while with CONWIP upstream stations can continue to operate for a somewhat lon- ger time. Then, after the reason for stoppage has been corrected, there will be less need to make up lost production than if the entire line had been shut down, as it would be under kanban. Also, in a mixed product environment, CONWIP can be easier than kanban because kanban focuses on specific part numbers whereas CONWIP does not.

Close Vendor Relationships. Lean systems typically have close relationships with ven- dors, who are expected to provide frequent small deliveries of high-quality goods. Traditionally, buyers have assumed the role of monitoring the quality of purchased goods, inspecting ship- ments for quality and quantity, and returning poor-quality goods to the vendor for rework. JIT systems have little slack, so poor-quality goods cause a disruption in the smooth flow of work. Moreover, the inspection of incoming goods is viewed as inefficient because it does not add value to the product. For these reasons, the burden of ensuring quality shifts to the vendor. Buy- ers work with vendors to help them achieve the desired quality levels and to impress upon them the importance of consistent, high-quality goods. The ultimate goal of the buyer is to be able to certify a vendor as a producer of high-quality goods. The implication of certification is that a vendor can be relied on to deliver high-quality goods without the need for buyer inspection.

Suppliers also must be willing and able to ship in small lots on a regular basis. Ideally, suppliers themselves will be operating under JIT systems. Buyers can often help suppliers convert to JIT production based on their own experiences. In effect, the supplier becomes part of an extended JIT system that integrates the facilities of buyer and supplier. Integration is easier when a supplier is dedicated to only one or a few buyers. In practice, a supplier is likely to have many different buyers, some using traditional systems and others using JIT. Conse- quently, compromises may have to be made by both buyers and suppliers.

Traditionally, a spirit of cooperation between buyer and seller has not been present; buyers and vendors have had a somewhat adversarial relationship. Buyers have generally regarded price as a major determinant in sourcing, and they have typically used multiple-source pur- chasing, which means having a list of potential vendors and buying from several to avoid getting locked into a sole source. In this way, buyers play vendors off against each other to get better pricing arrangements or other concessions. The downside is that vendors cannot rely on a long-term relationship with a buyer, and they feel no loyalty to a particular buyer. Further- more, vendors have often sought to protect themselves from losing a buyer by increasing the number of buyers they supply.

Under JIT purchasing, good vendor relationships are very important. Buyers take measures to reduce their lists of suppliers, concentrating on maintaining close working relationships with a few good ones. Because of the need for frequent, small deliveries, many buyers attempt to find local vendors to shorten the lead time for deliveries and to reduce lead time variability. An added advantage of having vendors nearby is quick response when problems arise.

JIT purchasing is enhanced by long-term relationships between buyers and vendors. Ven- dors are more willing to commit resources to the job of shipping according to a buyer’s JIT system given a long-term relationship. Moreover, price often becomes secondary to other aspects of the relationship (e.g., consistent high quality, flexibility, frequent small deliveries, and quick response to problems).

Supplier Tiers A key feature of many lean production systems is the relatively small num- ber of suppliers used. In traditional production, companies often deal with hundreds or even thousands of suppliers in a highly centralized arrangement not unlike a giant wheel with many spokes. The company is at the hub of the wheel, and the spokes radiate out to suppliers, each of whom must deal directly with the company. In traditional systems, a supplier does not know the other suppliers or what they are doing. Each supplier works to specifications provided by the buyer. Suppliers have very little basis (or motivation) for suggesting improve- ments. Moreover, as companies play one supplier off against others, the sharing of informa- tion is more risky than rewarding. In contrast, lean production companies may employ a tiered approach for suppliers: They use relatively few first-tier suppliers who work directly with

ste24102_ch14_604-639.indd 624ste24102_ch14_604-639.indd 624 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

Chapter Fourteen JIT and Lean Operations 625

the company or who supply major subassemblies. The first-tier suppliers are responsible for dealing with second-tier suppliers who provide components for the subassemblies, thereby relieving the final buyer from dealing with large numbers of suppliers.

The automotive industry provides a good example of this situation. Suppose a certain car model has an electric seat. The seat and motor together might entail 250 separate parts. A tra- ditional producer might use more than 30 suppliers for the electric seat, but a lean producer might use a single (first-tier) supplier who has the responsibility for the entire seat unit. The company would provide specifications for the overall unit, but leave to the supplier the details of the motor, springs, and so on. The first-tier supplier, in turn, might subcontract the motor to a second-tier supplier, the track to another second-tier supplier, and the cushions and fabric to still another. The second-tier suppliers might subcontract some of their work to third-tier sup- pliers, and so on. Each tier has only to deal with those just above it or just below it. Suppliers on each level are encouraged to work with each other, and they are motivated to do so because that increases the probability that the resulting item (the seat) will meet or exceed the final buy- er’s expectations. In this “team of suppliers” approach, all suppliers benefit from a successful product, and each supplier bears full responsibility for the quality of its portion of the product. Figure 14.4 illustrates the difference between the traditional approach and the tiered approach.

Reduced Transaction Processing. Traditional manufacturing systems often have many built-in transactions that do not add value. In their classic article, “The Hidden Factory,” 2 Jeffrey G. Miller and Thomas Vollmann identify a laundry list of transaction processing that comprises a “hidden factory” in traditional manufacturing planning and control systems, and point out the tremendous cost burden that results. The transactions can be classified as logisti- cal, balancing, quality, or change transactions.

Logistical transactions include ordering, execution, and confirmation of materials trans- ported from one location to another. Related costs cover shipping and receiving personnel, expediting orders, data entry, and data processing.

Balancing transactions include forecasting, production planning, production control, pro- curement, scheduling, and order processing. Associated costs relate to the personnel involved in these and supporting activities.

Quality transactions include determining and communicating specifications, monitoring, recording, and followup activities. Costs relate to appraisal, prevention, internal failures (e.g., scrap, rework, retesting, delays, administration activities) and external failures (e.g., warranty costs, product liability, returns, potential loss of future business).

2 Excerpted from Jeffrey Miller and Thomas Vollmann, “The Hidden Factory,” Harvard Business Review, September/October 1985, pp. 141–50. Copyright © 1985 by the Harvard Business School Publishing Corporation. All rights reserved.

FIGURE 14.4 Traditional supplier network compared to supplier tiers

Buyer Buyer

Supplier

Supplier

Supplier

Supplier

Supplier Supplier

SupplierSupplier

Supplier Supplier Supplier Supplier Supplier Supplier

Supplier

Supplier

Supplier

First-tier supplier

Second-tier suppliers

Third-tier suppliers

Supplier

A. Traditional B. Tiered

ste24102_ch14_604-639.indd 625ste24102_ch14_604-639.indd 625 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

626 Chapter Fourteen JIT and Lean Operations

Change transactions primarily involve engineering changes and the ensuing changes gen- erated in specifications, bills of material, scheduling, processing instructions, and so on. Engi- neering changes are among the most costly of all transactions.

Lean systems cut transaction costs by reducing the number and frequency of transactions. For example, suppliers deliver goods directly to the production floor, bypassing the storeroom entirely, thereby avoiding the transactions related to receiving the shipment into inventory storage and later moving the materials to the production floor. In addition, vendors are certi- fied for quality, eliminating the need to inspect incoming shipments for quality. The unending quest for quality improvement that pervades lean systems eliminates many of the above- mentioned quality transactions and their related costs. The use of bar coding (not exclusive to lean systems) can reduce data entry transactions and increase data accuracy.

Preventive Maintenance and Housekeeping. Because lean systems have very little in-process inventory, equipment breakdowns can be extremely disruptive. To minimize break- downs, companies use preventive maintenance programs, which emphasize maintaining equipment in good operating condition and replacing parts that have a tendency to fail before they fail. Workers are often responsible for maintaining their own equipment.

Even with preventive maintenance, occasional equipment failures will occur. Companies must be prepared for this, so they can quickly return equipment to working order. This may mean maintaining supplies of critical spare parts and making other provisions for emergency situations, perhaps maintaining a small force of repair people or training workers to do certain repairs themselves. Note that when breakdowns do occur, they indicate potential opportuni- ties to be exploited in a lean environment.

Housekeeping involves keeping the workplace clean as well as keeping it free of any materials that are not needed for production, because those materials take up space and may cause disruptions to the work flow.

Housekeeping is part of what is often referred to as the five S’s, which are five behaviors intended to make the workplace effective:

1. Sort. Decide which items are needed to accomplish the work, and keep only those items.

2. Straighten. Organize the workplace so that the needed items can be accessed quickly and easily.

3. Sweep. Keep the workplace clean and ready for work. Perform equipment maintenance regularly.

4. Standardize. Use standard instructions and procedures for all work.

5. Self-discipline. Make sure that employees understand the need for an uncluttered workplace.

Among the benefits of the five S’s are increased productivity, improved employee morale, decreased risk of accidents, and improved appearance for visitors. Employees and managers must appreciate the rationale for the five S’s. Otherwise, they may view them as unnecessary and a waste of effort.

Lean systems have been described and compared with traditional manufacturing systems in the preceding pages. Table 14.3 provides a brief overview of those comparisons.

Preventive maintenance   Maintaining equipment in good operating condition and replac- ing parts that have a tendency to fail before they actually do fail.

Housekeeping  Maintaining a workplace that is clean and free of unnecessary materials.

Factor Traditional Lean

Inventory Much, to offset forecast errors, late deliveries Minimal necessary to operate Deliveries Few, large Many, small Lot sizes Large Small Setups, runs Few, long runs Many, short runs Vendors Long-term relationships are unusual Partners Workers Necessary to do the work Assets

TABLE 4.3 Comparison of lean and traditional production philosophies

ste24102_ch14_604-639.indd 626ste24102_ch14_604-639.indd 626 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

Chapter Fourteen JIT and Lean Operations 627

14.4 LEAN TOOLS This section describes several tools that are used for process improvement in lean systems.

Value Stream Mapping Value stream mapping is a visual tool to systematically examine the flow of materials and information involved in bringing a product or service to a consumer. The technique originated at Toyota, where it is referred to as “Material and Information Flow Mapping.”

The map is a sketch of an entire process that typically ranges from incoming goods from suppliers to shipment of a product or delivery of a service to the customer. The map shows all processes in the value stream, from arrivals of supplies to the shipping of the product. The objective is to increase value to the customer, where value is typically defined in terms of qual- ity, time, cost, or flexibility (e.g., rapid response or agility). Data collected during the mapping process might include times (e.g., cycle time, setup time, changeover time, touch time, lead time), distances traveled (e.g., by parts, workers, paperwork), mistakes (e.g., product defects, data entry errors), inefficient work methods (e.g., extra motions, excessive lifting or moving, repositioning), and waiting lines (e.g., workers waiting for parts or equipment repairs, orders waiting to be processed). Information flows are also included in the mapping process.

You can get a sense of value stream mapping from the following tips for developing an effective mapping of a value stream: 3

1. Map the value stream in person.

2. Begin with a quick walk through of the system from beginning to end to get a sense of the system.

3. Then do a more thorough walkthrough following the actual pathway to collect current information on material or information flow.

4. Record elements of the system such as cycle times, scrap rates, amounts of inventory, downtimes, number of operators, distances between processes, and transfer times.

Value improvement for a product or a service embodies the five lean principles described ear- lier and repeated here. It begins by specifying value from the customer’s standpoint. You can see where value stream mapping can help process improvement:

1. Specify value from the standpoint of the end customer.

2. Identify all the steps in the value stream and create a visual (map) of the value stream.

3. Eliminate steps that do not create value to create flow.

4. Use next-customer-in-the-process demand to pull from each preceding process as needed to control the flow.

5. Repeat this process as long as waste exists in the system.

Once a value stream map is completed, data analysis can uncover improvement opportuni- ties by asking key questions, such as:

Where are the process bottlenecks?

Where do errors occur?

Which processes have to deal with the most variation?

Where does waste occur?

All business organizations, whether they are primarily engaged in service or manufactur- ing, can benefit by applying lean principles to their office operations. This includes purchas- ing, accounting, order entry, and other office functions. Office wastes might include:

1. Excess inventory —excess supplies and equipment.

2. Overprocessing —excess paperwork and redundant approvals.

LO14.9 Describe key lean improvement tools.

Value stream mapping  A visual tool to systematically examine the flow of materials and information.

3 Adapted from Rother, Mike, and John Shook. Learning to See. Cambridge, MA: Lean Enterprise Institute, 2009.

ste24102_ch14_604-639.indd 627ste24102_ch14_604-639.indd 627 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

628 Chapter Fourteen JIT and Lean Operations

3. Waiting times —orders waiting to be processed, requests for information awaiting answers.

4. Unnecessary transportation —inefficient routing.

5. Processing waste —using more resources than necessary to accomplish a task.

6. Inefficient work methods —poor layout design, unnecessary steps, inadequate training.

7. Mistakes —order entry errors, lost files, miscommunications.

8. Underused people—Not tapping all of the mental and creative capabilities of workers.

Process Improvement Using 5W2H Asking certain questions about a process can lead to cost and waste reduction. The 5W2H approach (five questions that begin with w, and two questions that begin with h ) is outlined in Table 14.4 . This approach can be used by itself or in conjunction with value stream mapping.

Lean and Six Sigma Some believe that lean and six sigma are two alternate approaches for process improve- ment. However, another view is that the two approaches are complementary and, when used together, can lead to superior results.

Lean strives to eliminate non-value-added activities, using simple tools to find and elimi- nate them. It focuses on maximizing process velocity, and it employs tools to analyze and improve process flow. However, variation exists in all processes. Understanding and reducing variation are important for quality improvement. Lean principles alone cannot achieve statis- tical process control, and six sigma alone cannot achieve improved process speed and flow. Using the two approaches in combination integrates lean principles and six sigma statistical tools for variation reduction to achieve a system that has both a balanced flow and quality.

JIT Deliveries and the Supply Chain Direct suppliers must be able to support frequent just-in-time deliveries of small batches of parts. That may lead to an increase in transportation costs if trucks carry partial loads, and perhaps to congestion at loading docks. Moreover, the JIT delivery requirement may extend to other portions of the supply chain, in which case close coordination among supply chain part- ners is critical. Also, JIT delivery results in pressure for on-time deliveries to avoid production interruptions due to stockouts.

5W2H approach  A method of asking questions about a process that includes what, why, where, when, who, how, and how much.

Category 5W2H Typical Questions Goal

Subject What? What is being done? Identify the focus of analysis. Purpose Why? Why is this necessary? Eliminate unnecessary tasks. Location Where? Where is it being done? Improve the location. Why is it done there? Would it be better to do it someplace else? Sequence When? When is it done? Improve the sequence. Would it be better to do it at another time? People Who? Who is doing it? Improve the sequence or output. Could someone else do it better? Method How? How is it being done? Simplify tasks, improve output. Is there a better way? Cost How much? How much does it cost now? Select an improved method. What would the new cost be?

Source: Adapted from Alan Robinson, ed., Continuous Improvement in Operations: A Systematic Approach to Waste Reduction, p. 246. Copyright © 1991 Productivity Press. www.productivitypress.com .

TABLE 14.4 The 5W2H approach

ste24102_ch14_604-639.indd 628ste24102_ch14_604-639.indd 628 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

Chapter Fourteen JIT and Lean Operations 629

Lean and ERP Lean systems focus on pacing production and synchronizing delivery of incoming supply. SAP’s Lean Planning and Operations module extends ERP to lean operation by providing lean planning and scheduling capability linked to customer demand. It enables leveling of schedules and synchronization of supply chain activities with paced company operations.

14.5 TRANSITIONING TO A LEAN SYSTEM The success of lean systems in Japan and the United States has attracted keen interest among other traditional manufacturers.

Planning a Successful Conversion To increase the probability of successful transition, companies should adopt a carefully planned approach that includes the following elements:

1. Make sure top management is committed to the conversion and that they know what will be required. Make sure that management is involved in the process and knows what it will cost, how long it will take to complete the conversion, and what results can be expected.

2. Study the operations carefully; decide which parts will need the most effort to convert.

3. Obtain the support and cooperation of workers. Prepare training programs that include sessions in setups, maintenance of equipment, cross-training for multiple tasks, coopera- tion, and problem solving. Make sure workers are fully informed about what lean is and why it is desirable. Reassure workers that their jobs are secure.

4. Begin by trying to reduce setup times while maintaining the current system. Enlist the aid of workers in identifying and eliminating existing problems (e.g., bottlenecks, poor quality).

5. Gradually convert operations, beginning at the end of the process and working back- ward. At each stage, make sure the conversion has been relatively successful before moving on. Do not begin to reduce inventories until major problems have been resolved.

6. As one of the last steps, convert suppliers to JIT and be prepared to work closely with them. Start by narrowing the list of vendors, identifying those who are willing to embrace the lean philosophy. Give preference to vendors who have long-term track records of reliability. Use vendors located nearby if quick response time is important. Establish long-term commitments with vendors. Insist on high standards of quality and adherence to strict delivery schedules.

7. Be prepared to encounter obstacles to conversion.

Obstacles to Conversion Converting from a traditional system to a lean system may not be smooth. For example, cultures vary from organization to organization. Some cultures relate better to the lean philosophy than others. If a culture doesn’t relate, it can be difficult for an organization to change its culture within a short time. Also, manufacturers that operate with large amounts of inventory to han- dle varying customer demand may have difficulty acclimating themselves to less inventory.

LO14.10 Outline considerations for successful conversion from a traditional system to a lean system.

LO14.11 Describe some of the obstacles to lean success.

Ford Motor Company took a page out of Toyota’s just-in-time book at its Chicago plant by having some of its suppliers locate very close to its assembly plant. It leased production facilities on its 155 acres to about 10 key suppliers. Suppliers’ parts and components feed directly into Ford’s assembly operation, carefully coordinated to match the sequence

READING Nearby Suppliers Match Ford’s Mix

of vehicles Ford is producing, which can range from small cars to SUVs. Not only are suppliers nearby in case problems arise, the shortened travel distance and lead times yield tremendous savings in the pipeline inventories of parts and materials.

ste24102_ch14_604-639.indd 629ste24102_ch14_604-639.indd 629 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

630 Chapter Fourteen JIT and Lean Operations

Some other obstacles include the following:

1. Management may not be totally committed or may be unwilling to devote the necessary resources to conversion. This is perhaps the most serious impediment because the con- version is probably doomed without serious commitment.

2. Workers and/or management may not display a cooperative spirit. The system is predicated on cooperation. Managers may resist because lean shifts some of the respon- sibility from management to workers and gives workers more control over the work. Workers may resist because of the increased responsibility and stress.

3. It can be very difficult to change the culture of the organization to one consistent with the lean philosophy.

4. Suppliers may resist for several reasons:

a. Buyers may not be willing to commit the resources necessary to help them adapt to the lean systems.

b. They may be uneasy about long-term commitments to a buyer.

c. Frequent, small deliveries may be difficult, especially if the supplier has other buyers who use traditional systems.

d. The burden of quality control will shift to the supplier.

e. Frequent engineering changes may result from continuing lean improvements by the buyer.

A Cooperative Spirit Lean systems require a cooperative spirit among workers, management, and vendors. Unless that is present, it is doubtful that a truly effective lean system can be achieved. The Japanese have been very successful in this regard, partly because respect and cooperation are ingrained in the Japanese culture. In Western cultures, workers, managers, and vendors have historically been strongly at odds with each other. Consequently, a major consideration in converting to a lean system is whether a spirit of mutual respect and cooperation can be achieved. This requires an appreciation of the importance of cooperation and a tenacious effort by manage- ment to instill and maintain that spirit.

Finally, it should be noted that not all organizations lend themselves to a lean approach. Lean is best used for repetitive operations under fairly stable demand.

Despite the many advantages of lean production systems, an organization must take into account a number of other considerations when planning a conversion.

The key considerations are the time and cost requirements for successful conversion, which can be substantial. But it is absolutely essential to eliminate the major sources of disruption in the system. Management must be prepared to commit the resources necessary to achieve a high level of quality and to function on a tight schedule. That means attention to even the smallest of details during the design phase and substantial efforts to debug the system to the point where it runs smoothly. Beyond that, management must be capable of responding quickly when problems arise, and both management and workers must be committed to the continuous improvement of the system. Although each case is different, a general estimate of the time required for conversion is one to three years.

14.6 LEAN SERVICES The discussion of lean systems has focused on manufacturing simply because that is where it was developed, and where it has been used most often. It is important to recognize that the full spectrum of lean benefits are more difficult to achieve in service operations. Nonetheless, services can and do benefit from many lean concepts. When just-in-time is used in the context of services, the focus is often on the time needed to perform a service—because speed is often an important order winner for services. Some services do have inventories of some sort, so

ste24102_ch14_604-639.indd 630ste24102_ch14_604-639.indd 630 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

Chapter Fourteen JIT and Lean Operations 631

inventory reduction is another aspect of lean that can apply to services. Examples of speedy delivery (“available when requested”) are Domino’s Pizza, FedEx and Express Mail, fast- food restaurants, and emergency services. Other examples include just-in-time publishing and work cells at fast-food restaurants.

In addition to speed, lean services emphasize consistent, high-quality, standard work meth- ods; flexible workers; and close supplier relationships.

Process improvement and problem solving can contribute to streamlining a system, result- ing in increased customer satisfaction and higher productivity. The following are the ways lean benefits can be achieved in services:

• Eliminate disruptions. For example, try to avoid having workers who are servicing customers also answer telephones.

• Make the system flexible. This can cause problems unless approached carefully. Often, it is desirable to standardize work because that can yield high productivity. On the other hand, being able to deal with variety in task requirements can be a competitive advan- tage. One approach might be to train workers so that they can handle more variety. Another might be to assign work according to specialties, with certain workers handling different types of work according to their specialty.

• Reduce setup times and processing times. Have frequently used tools and spare parts readily available. Additionally, for service calls, try to estimate what parts and supplies might be needed so they will be on hand, and avoid carrying huge inventories.

• Eliminate waste. This includes errors and duplicate work. Keep the emphasis on qual- ity and uniform service.

• Minimize work-in-process. Examples include orders waiting to be processed, calls waiting to be answered, packages waiting to be delivered, trucks waiting to be unloaded or loaded, applications waiting to be processed.

• Simplify the process. This works especially when customers are part of the system (self-service systems including retail operations, ATMs and vending machines, service stations, etc.).

The Pyxis® ProcedureStation™ system provides rapid access to inventory in the operating room, cath and cardiac labs, and other specialty departments. Usage, inventory, and replenishment information are transmitted electronically, creating an efficient supply management and workflow process.

ste24102_ch14_604-639.indd 631ste24102_ch14_604-639.indd 631 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

632 Chapter Fourteen JIT and Lean Operations

When you think of a hospital, what comes to mind? Patients, emergency rooms, technology and medical advancements. Making the sick and injured well again.

When officials at Virginia Mason think of hospitals, they think of cars. A car manufacturing plant, to be exact.

Beginning in 2000 the hospital’s leaders looked at their infrastruc- ture and saw it was designed around them, not the patient, said Dr. Gary Kaplan, Virginia Mason’s chairman and chief executive officer.

For example, you hurry up and be on time, only to wait for the physi- cian to see you.

They began looking for a better way to improve quality, safety and patient satisfaction. After two years of searching, they discovered the Toyota Production System, also known as lean manufacturing. Devel- oped in part by Japanese businessman Taiichi Ohno, the idea is to elimi- nate waste and defects in production. Virginia Mason has tailored the Japanese model to fit health care.

Kaplan and other Virginia Mason managers took their first trip to Japan in 2002 where they visited manufacturing plants such as Toyota and Yamaha. Nearly 200 employees have toured plants in Japan and a ninth trip is planned for this summer. While Virginia Mason couldn’t say exactly how much they paid over the years to send the staff overseas, officials liken it to leadership training other companies pay for their employees. They say the benefits offset the costs.

“‘People are not cars’ is very common for me to hear,” Kaplan said. “We get so wrapped up in the seriousness and specialness of health care, but we also have to open our eyes to other industries—we’re way behind in information specialists and taking waste out of our process. Toyota is obsessed with the customer and customer satisfaction . . . all those things Toyota was about was what we wanted.”

So what does that mean? There are seven wastes, according to the production system. One

is wasting time, such as patients waiting for a doctor or for test results to come back. Others are inventory waste—having more materials and information than is necessary—and overproduction waste, producing more than is necessary.

Take, for example, stockpiling brochures and pamphlets in storage closets. They take up space. There is wasted cost to make so many pamphlets that aren’t needed.

The hospital and all of its campuses in the Seattle area implemented a Kanban system, which signals the need to restock. Kanban, which means “visual card” in Japanese, uses exactly that—a card put near the bottom of a pile of tongue dispensers, gauze strips or brochures, for example. When a nurse or physician sees the card, he or she knows it’s time to refill. Supplies don’t run out, but they also aren’t over-ordered.

The hospital created standardized instrument trays for surgeries and procedures, which saved several hundred dollars by no longer setting out extra instruments no one used. Unused but opened instruments have to be thrown away.

It takes a series of simple steps to make improvements, said Janine Wentworth, an administrative director who returned from a two-week trip to Japan last month. One example is the development of a flip chart

READING To Build a Better Hospital, Virginia Mason Takes Lessons from Toyota Plants

showing the level of mobility in physical therapy patients. The chart shows the appropriate picture of what the patient can do, and each nurse or physician who comes in the room doesn’t have to waste time searching charts or asking questions.

Wentworth also wants to implement a production plan to hire more staff before a shortage exists based on turnover rates on any given hospital floor.

Another adaptation from the Toyota model is a patient safety alert system. At the manufacturing plant, if there’s a problem, the whole line is stopped and the problem is fixed immediately. Virginia Mason’s prac- tice had been to identify and fix problems after the fact, perhaps leading to mistakes recurring many times before a solution was found. The alert system allows nurses and physicians to signal a problem when it hap- pens and fix it immediately. Virginia Mason’s Kirkland site has about 10 alerts each day.

The Kirkland campus implemented the Toyota model in 2003. They’ve reduced appointment and telephone delays by having medical assistants handle incoming calls, instead of medically untrained operators.

Also, instead of doctors waiting until the end of the day to go through a stack of patient records, they now write comments and recommenda- tions immediately after seeing the patient before going to see the next one. The time saved increases the time a physician can spend with a patient. Dr. Kim Pittenger, medical director at Virginia Mason Kirkland, said most of the cost of medical care involves clogs in the flow of infor- mation—paper forms, lab results, phone messages, often leading to irritated patients. Working the backlog down costs more than if you never let things pile up in the first place, he said.

He said not everyone has agreed with the new system and a few physicians have left Virginia Mason because of it.

“To some it seems like obsessive-compulsive disorder run amok, but it’s part of a solution that eliminates mistakes,” Pittenger said.

Other hospitals, including Swedish Medical Center, have incorpo- rated the lean system into parts of their operation.

Virginia Mason said overall benefits include an 85 percent reduction in how long patients wait to get lab results back, and lowering inven- tory costs by $1 million. They’ve redesigned facilities to make patient and staff work flow more productive. The hospital reduced overtime and temporary labor expenses by $500,000 in one year and increased pro- ductivity by 93 percent. While direct cost savings aren’t passed on to patients with the new system, less waiting, increased safety and more efficient care are.

Kaplan’s vision is to have patients start their appointment in the parking garage with a smart card that triggers their entire appointment process. No more waiting rooms, just move directly from the garage to an examination room.

Total flow—no waiting, no waste and it’s all about the patient. “We have more than enough resources in health care,” Kaplan said.

“We just need to stop wasting it and only do what’s appropriate and value-added and we’d save billions.”

Source: Cherie Black, “To Build a Better Hospital, Virginia Mason Takes Lessons from Toyota Plant,” Seattle Post-Intelligencer, March 15, 2008. Copyright © 2008. Used with permission.

ste24102_ch14_604-639.indd 632ste24102_ch14_604-639.indd 632 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

Chapter Fourteen JIT and Lean Operations 633

JIT service can be a major competitive advantage for companies that can achieve it. An important key to JIT service is the ability to provide service when it is needed. That requires flexibility on the part of the provider, which generally means short setup times, and it requires clear communication on the part of the requester. If a requester can determine when it will need a particular service, a JIT server can schedule deliveries to correspond to those needs, eliminating the need for continual requests, and reducing the need for provider flexibility— and therefore probably reducing the cost of the JIT service.

Although lean concepts are applicable to service organizations, the challenge of imple- menting lean in service is that there are still relatively few lean service applications that service companies can reference to see how to apply the underlying lean principles. Con- sequently, it can be difficult to build a strong commitment among workers to achieve a lean service system.

14.7 JIT II In some instances, companies allow suppliers to manage restocking of inventory obtained from the suppliers. A supplier representative works right in the company’s plant, making sure there is an appropriate supply on hand. The term JIT II is used to refer to this practice. JIT II was popularized by the Bose Corporation. It is often referred to as vendor-managed inventory (VMI). You can also read more about vendor-managed inventories in the supply chain man- agement chapter (Chapter 15).

14.8 OPERATIONS STRATEGY

The lean operation offers new perspectives on operations that must be given serious consider- ation by managers in repetitive and batch systems who wish to be competitive.

Potential adopters should carefully study the requirements and benefits of lean production systems, as well as the difficulties and strengths of their current systems, before making a decision on whether to convert. Careful estimates of time and cost to convert, and an assess- ment of how likely workers, managers, and suppliers are to cooperate in such an approach, are essential.

The decision to convert can be sequential, giving management an opportunity to gain first- hand experience with portions of lean operations without wholly committing themselves. For instance, improving vendor relations, reducing setup times, improving quality, and reducing waste and inefficiency are desirable goals in themselves. Moreover, a level production sched- ule is a necessary element of a lean system, and achieving that will also be useful under a traditional system of operation.

It is prudent to carefully weigh the risks and benefits of a just-in-time approach to inven- tories. A just-in-time approach can make companies and even countries vulnerable to disrup- tions in their supply chains. For example, low stockpiles of flu vaccine at hospitals lower their costs but leave the health system at risk if there is a flu outbreak. Also, severe weather such as hurricanes, floods, and tornadoes, and other natural disasters caused by earthquakes can cut off supply routes, leaving community services as well as companies desperately in need of supplies.

Supplier management is critical to a JIT operation. Generally, suppliers are located nearby to facilitate delivery on a daily or even hourly basis. Moreover, suppliers at every stage must gauge the ability of their production facilities to meet demand requirements that are subject to change.

Finally, the success of a lean system relies heavily on leadership commitment, involve- ment, and support, achieving a lean thinking “culture” that includes everyone in the organiza- tion, and having effective teamwork. Without these three elements, the full benefits of lean are not likely to be realized.

ste24102_ch14_604-639.indd 633ste24102_ch14_604-639.indd 633 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

634 Chapter Fourteen JIT and Lean Operations

Lean operation is an alternative to traditional operation that an increasing number of organizations are adopting. The ultimate goal of a lean system is to achieve a balanced, smooth flow of operations. Sup- porting goals include eliminating disruptions to the system, making the system flexible, and eliminating waste. The building blocks of a lean production system are product design, process design, personnel and organization, and manufacturing planning and control.

Lean systems require the elimination of sources of potential disruption to the even flow of work. High quality is essential because problems with quality can disrupt the process. Quick, low-cost setups, special layouts, allowing work to be pulled through the system rather than pushed through, and a spirit of cooperation are important features of lean systems. So, too, are problem solving aimed at reduc- ing disruptions and making the system more efficient, and an attitude of working toward continual improvement.

Key benefits of lean systems are reduced inventory levels, high quality, flexibility, reduced lead times, increased productivity and equipment utilization, reduced amounts of scrap and rework, and reduced space requirements. The risks stem from the absence of buffers, such as extra personnel and inventory stockpiles to fall back on if something goes wrong. The possible results of risks include lost sales and lost customers.

Just-in-time (JIT) is a system of lean production used mainly in repetitive operations, in which goods move through the system and tasks are completed just in time to maintain the schedule. JIT systems require very little inventory because successive operations are closely coordinated. Careful planning and much effort are needed to achieve a smoothly functioning system in which all resources needed for pro- duction come together at precisely the right time throughout the process. Raw materials and purchased parts must arrive when needed, fabricated parts and subassemblies must be ready when needed for final assembly, and finished goods must be delivered to customers when needed. Special attention must be given to reducing the risk of disruptions to the system as well as rapid response to resolving any disrup- tions that do occur. Usually, a firm must redesign its facilities and rework labor contracts to implement lean operation. Teamwork and cooperation are important at all levels, as are problem-solving abilities of workers and an attitude of continuous improvement.

Table 14.5 provides an overview of lean.

SUMMARY

Lean systems are designed to operate with fewer resources than traditional systems.

Elements of lean operation include: Smooth flow of work (the ultimate goal). Elimination of waste. Continuous improvement. Elimination of anything that does not add value. Simple systems that are easy to manage. Use of product layouts that minimize time spent moving materials and parts. Quality at the source: Each worker is responsible for the quality of his

or her output. Poka-yoke: fail-safe tools and methods to prevent mistakes. Preventive maintenance to reduce the risk of equipment breakdown. Good housekeeping: an orderly and clean workplace. Setup time reduction. Cross-trained workers. A pull system. There are seven types of waste: Inventory. Overproduction. Waiting time. Excess transportation. Processing waste. Inefficient work methods. Product or service defects.

TABLE 14.5 Overview of lean

ste24102_ch14_604-639.indd 634ste24102_ch14_604-639.indd 634 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

Chapter Fourteen JIT and Lean Operations 635

1. Lean systems produce high-quality goods or services using fewer resources than traditional opera- tions systems.

2. Lean thinking helps business organizations to become more productive, reduce costs, and be more market-responsive.

3. Lean operations are designed to eliminate waste (value stream mapping), minimize inventory (JIT deliveries), maximize work flow (small batches with quick changeovers), make only what is needed (demand pull), empower work teams, do it right the first time (quality at the source), and continually improve.

KEY POINTS

activity-based costing, 618 andon, 618 autonomation, 613 5W2H approach, 628 heijunka, 607 housekeeping, 626 jidoka, 607

just-in-time (JIT), 605 kaizen, 607 kanban, 607, 621 lean operation, 605 muda, 607 poka-yoke, 616 preventive maintenance, 626

pull system, 620 push system, 620 single-minute exchange of die (SMED), 612 takt time, 614 value stream mapping, 627

KEY TERMS

SOLVED PROBLEMS

Determine the number of containers needed for a workstation that uses 100 parts per hour if the time for a container to complete a cycle (move, wait, empty, return, fill) is 90 minutes and a standard con- tainer holds 84 parts. An inefficiency factor of .10 is currently being used.

Problem 1

Solution

N

D

T

C

X

N D T X

C

?

100 parts per hour

90 minutes (1.5 hours)

84 parts

.10

( )(1 ) 100(1.5)(1 .10)

84 1.96; round to 2 containers

� �

� �

Problem 2 Determine the number of cycles per day and the production quantity per cycle for this set of products. The department operates five days a week. Assume the sequence A-B-C-D will be used.

Product Weekly Quantity

A 20

B 40

C 30

D 15

Solution Convert weekly quantities to daily quantities. The smallest daily quantity is 3 units. Producing in multiples of 3 units leaves A and B a few units short:

Use three cycles, producing all four products in every cycle. Produce units that are short by adding units to some cycles. Disperse the additional units as evenly as possible. There are several possibilities. One is

Product  Daily Quantity  �  Weekly Quantity  �  5 Units Short Using 3 Cycles

A 20  �  5  �  4 1

B 40  �  5  �  8 2

C 30  �  5  �  6 —

D 15  �  5  �  3 —

Cycle 1 2 3

Pattern A B(3) C(2) D A B(3) C(2) D A(2) B(2) C(2) D

Extra unit(s) B B A

ste24102_ch14_604-639.indd 635ste24102_ch14_604-639.indd 635 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

636 Chapter Fourteen JIT and Lean Operations

Product Daily Quantity

A 21

B 12

C 3

D 15

1. Some key elements of production systems are listed in Table � 14.3. Explain briefly how lean sys- tems differ from traditional production systems for each of those elements.

2. What is the ultimate goal of a lean system? What are the supporting goals? What are the building blocks?

3. Describe the philosophy that underlies JIT (i.e., what is JIT intended to accomplish?).

4. What are some of the main obstacles that must be overcome in converting from a traditional sys- tem to lean?

5. Briefly discuss vendor relations in lean systems in terms of the following issues: a. Why are they important? b. How do they tend to differ from the more adversarial relations of the past? c. Why might suppliers be hesitant about JIT purchasing?

6. Certain Japanese have claimed that Henry Ford’s assembly line provided some of the rationale for lean. What features of assembly lines are common to lean systems?

7. What is the kanban aspect of JIT?

8. Contrast push and pull methods of moving goods and materials through production systems.

9. What are the main benefits of a lean system?

10. What are the benefits and risks of small lot sizes?

DISCUSSION AND REVIEW QUESTIONS

1. What trade-offs are involved in shifting from a traditional operations system to a lean system for: a. A manufacturing firm? b. A service firm?

2. Who in the organization is affected by a decision to shift from a traditional operations system to a lean system?

3. To what extent has technology had an impact on lean systems?

TAKING STOCK

1. In operations management, as in life, a balanced approach is often the best policy. One of the best examples of the benefits of this in operations management is the lean approach. Explain the basic factors that must be in place in order to achieve a balanced lean system.

2. Give three examples of unethical behavior involving lean operations, and state the relevant ethical principle that would be violated.

CRITICAL THINKING EXERCISES

1. A manager wants to determine the number of containers to use for incoming parts for a kanban sys- tem to be installed next month. The process will have a usage rate of 80 pieces per hour. Because the process is new, the manager has assigned an inefficiency factor of .35. Each container holds 45 pieces, and it takes an average of 75 minutes to complete a cycle. How many containers should be used? As the system improves, will more or fewer containers be required? Why?

2. A JIT system uses kanban cards to authorize movement of incoming parts. In one portion of the system, a work center uses an average of 100 parts per hour while running. The manager has assigned an inefficiency factor of .20 to the center. Standard containers are designed to hold six dozen parts each. The cycle time for parts containers is about 105 minutes. How many containers are needed?

3. A machine cell uses 200 pounds of a certain material each day. Material is transported in vats that hold 20 pounds each. Cycle time for the vats is about two hours. The manager has assigned an inef- ficiency factor of .08 to the cell. The plant operates on an eight-hour day. How many vats will be used?

4. Determine the number of cycles per day and the production quantity per cycle for this set of vehicles:

PROBLEMS

ste24102_ch14_604-639.indd 636ste24102_ch14_604-639.indd 636 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

Chapter Fourteen JIT and Lean Operations 637

Level Operations is a small company located in eastern Pennsylvania. It produces a variety of security devices and safes. The safes come in several different designs. Recently, a number of new customers have placed orders, and the production facility has been enlarged to accom- modate increased demand for safes. Production manager Stephanie Coles is currently working on a production plan for the safes. She needs a plan for each day of the week. She has obtained the following infor- mation from the marketing department on projected demand for the next five weeks:

Model S1 S2 S7 S8 S9

Weekly Quantity 120 102 48 90 25

The department operates five days a week. One complexity is that partially completed safes are not permitted; each cycle must turn out finished units.

After discussions with engineering, Stephanie determined that the best production sequence for each cycle is S7-S8-S9-S1-S2.

Question What might Stephanie determine as the best production quantity per cycle for each day of the week?

CASE Level Operations

Use the sequence A-B-C-D.

5. Given this set of daily service operations, and assuming a processing order of A-B-C-D-E: a. Give one reason that each arrangement might be preferred over the other. b. Determine the number of repetitions for each service if four cycles are used. c. Determine the number of repetitions for each service if two cycles are used.

6. Determine the number of cycles per day and a production quantity per cycle for this set of products that achieves fairly level production:

Assume the production sequence will be F-G-H-K.

7. Compute the takt time for a system where the total time per shift is 480 minutes, there is one shift, and workers are given two 15-minute breaks and 45 minutes for lunch. Daily demand is 300 units.

8. What cycle time would match capacity and demand if demand is 120 units a day, there are two shifts of 480 minutes each, and workers are given three half-hour breaks during each shift, one of which is for lunch or dinner?

9. Compute the takt time for a service system that intended to perform a standardized service. The system will have a total work time of 440 minutes per day, two 10-minute breaks, and an hour for lunch. The service system must process 90 jobs a day.

Service Operation Number of Daily Reps

A 22

B 12

C 4

D 18

E 8

Product Daily Quantity

F 9

G 8

H 5

K 6

ste24102_ch14_604-639.indd 637ste24102_ch14_604-639.indd 637 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

638 Chapter Fourteen JIT and Lean Operations

The Boeing Company, headquartered in Chicago, Illinois, is one of the two major producers of aircraft in the global market. The other major producer is European Airbus.

Boeing produces three models in Everett, Washington: 747s, 767s, and 777s. The planes are all produced in the same building. At any one time, there may be as many as six planes in various stages of produc- tion. Obviously the building has to be fairly large to accommodate such a huge undertaking. In fact, the building is so large that it covers over 98 acres and it is four stories high, making it the largest building by volume in the world. It is so large that all of Disneyland would fit inside, and still leave about 15 acres for indoor parking! The windowless building has six huge doors along one side, each about 100 yards wide and 40 yards high (the size of a football field)—large enough to allow a completed airplane to pass through.

Boeing sells airplanes to airlines and countries around the globe. There isn’t a set price for the planes; the actual price depends on what features the customer wants. Once the details have been settled and an order submitted, the customer requirements are sent to the design department.

Design Designers formerly had to construct a mock-up to determine the exact dimensions of the plane and to identify any assembly problems that might occur. That required time, materials, labor, and space. Now they use computers (CAD) to design airplanes, avoiding the cost of the mock- ups and shortening the development time.

The Production Process Once designs have been completed and approved by the customer, pro- duction of the plane is scheduled, and parts and materials are ordered. Parts come to the plant by rail, airplane, and truck, and are delivered to the major assembly area of the plane they will be used for. The parts are scheduled so they arrive at the plant just prior to when they will be used in assembly, and immediately moved to storage areas close to where they will be used. Time-phasing shipments to arrive as parts are needed helps to keep inventory investment low and avoids having to devote space to store parts that won’t be used immediately. There is a trade- off, though, because if any parts are missing or damaged and have to be reordered, that could cause production delays. When missing or defec- tive parts are discovered, they are assigned priorities according to how critical the part is in terms of disruption of the flow of work. The parts with the highest priorities are assigned to expediters who determine the best way to replace the part. The expediters keep track of the progress of the parts and deliver them to the appropriate location as soon as they arrive. In the meantime, a portion of the work remains unfinished, awaiting the replacement parts, and workers complete other portions of the assembly. If the supplier is unable to replace the part in a time frame that will not seriously delay assembly, as a last resort, Boeing has a machine shop that can make the necessary part.

The partially assembled portions of the plane, and in later stages, the plane itself, move from station to station as the work progresses,

OPERATIONS TOUR Boeing

staying about five days at each station. Giant over- head cranes are used to move large sections from one station to the next, although once the wheel assemblies have been installed, the plane is towed to the remaining stations.

Finished planes are painted in one of two separate buildings. Paint- ing usually adds 400 to 600 pounds to the weight of a plane. The paint- ing process involves giving the airplane a negative charge and the paint a positive charge so that the paint will be attracted to the airplane.

Testing and Quality Control Boeing has extensive quality control measures in place throughout the entire design and production process. Not only are there quality inspec- tors, individual employees inspect their own work and the work previ- ously done by others on the plane. Buyers’ inspectors also check on the quality of the work.

There are 60 test pilots who fly the planes. Formerly planes were tested to evaluate their flight worthiness in a wind tunnel, which required expensive testing and added considerably to product develop- ment time. Now new designs are tested using a computerized wind tun- nel before production even begins, greatly reducing both time and cost. And in case you’re wondering, the wings are fairly flexible; a typical wing can flap by as much as 22 feet before it will fracture.

Re-engineering Boeing is re-engineering its business systems. A top priority is to upgrade its computer systems. This will provide better links to suppli- ers, provide more up-to-date information for materials management, and enable company representatives who are at customer sites to cre- ate a customized aircraft design on their laptop computer.

Another aspect of the re-engineering involves a shift to lean produc- tion. Key goals are to reduce production time and reduce inventory.

Boeing wants to reduce the time that a plane spends at each work station from 5 days to 3 days, a reduction of 40 percent. Not only will that mean that customers can get their planes much sooner, it will also reduce labor costs and inventory costs, and improve cash flow. One part of this will be accomplished by moving toward late-stage customization, or delayed differentiation. That would mean standard- izing the assembly of planes as long as possible before adding custom features. This, and other time-saving steps, will speed up production considerably, giving it a major competitive advantage. It also wants to reduce the tremendous amount of inventory it carries (a 747 jumbo jet has about 6 million parts, including 3 million rivets). One part of the plan is to have suppliers do more predelivery work by assembling the parts into kits that are delivered directly to the staging area where they will be installed on the aircraft instead of delivering separate parts to inventory. That would cut down on inventory carrying costs and save time.

Boeing is also hoping to reduce the number of suppliers it has, and to establish better links and cooperation from suppliers. Currently Boe- ing has about 3,500 suppliers. Compare that with GM’s roughly 2,500 suppliers, and you get an idea of how large this number is.

ste24102_ch14_604-639.indd 638ste24102_ch14_604-639.indd 638 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

Chapter Fourteen JIT and Lean Operations 639

Chalice, Robert. Improving Healthcare Using Toyota Lean Production Methods: 46 Steps for Improve- ment. 2nd ed. Milwaukee: ASQ Quality Press, 2007.

El-Haik, Basem, and David M. Roy. Service Design for Six Sigma: A Roadmap for Excellence. New York: Wiley-Interscience, 2005.

Hariharan, Arun. “CEO’s Guide to Six Sigma Success.” ASQ Six Sigma Forum Magazine, May 2006, pp. 16–25.

Hopp, Wallace J., and Mark Spearman. Factory Physics: Foundations of Manufacturing Manage- ment. 3rd ed. New York: Irwin/McGraw-Hill, 2007.

Jacobs, F. Robert, William L. Berry, D. Clay Whybark, and Thomas E. Vollmann. Manufacturing Planning and Control Systems for Supply Chain Management. 6th ed. New York: Irwin/McGraw-Hill, 2011.

Liker, Jeffrey. The Toyota Way: 14 Management Prin- ciples from the World’s Greatest Manufacturer. New York: McGraw-Hill, 2004.

Liker, Jeffery K., and Gary Convis. The Toyota Way to Lean Leadership: Achieving and Sustaining Excel- lence through Leadership Development. New York: McGraw-Hill, 2011.

Mann, David. Creating a Lean Culture: Tools to Sustain Lean Conversions. New York: Productivity Press, 2005.

Monden, Yasuhiro. “What Makes the Toyota Production System Really Tick?” Industrial Engineering 13, no. 1 (January 1981), pp. 38–46.

Rich, Nick, Nicola Bateman, Ann Esain, Lynn Massey, and Donna Samuel. Lean Evolution: Lessons from the Workplace. New York: Cambridge University Press, 2006.

Rother, Mike, and John Shook. Learning to See. Cambridge, MA: The Lean Institute, 2009.

Shingo, Shigeo. Non-Stock Production: The Shingo System for Continuous Improvement. New York: Productivity Press, 2006.

Spear, Steven, and H. Kent Bowen. “Decoding the DNA of the Toyota Production System.” Harvard Business Review, 77, no. 5, (Sept. – Oct, 1999).

Swank, Cynthia Karen. “The Lean Service Machine.” Harvard Business Review, October 2003, pp. 123–129.

Taghizadegan, Salman. Essentials of Lean Six Sigma. Burlington, MA: Butterworth-Heinemann, 2006.

Womack, James P., and Daniel T. Jones. Lean Thinking: Banish Waste and Create Wealth in Your Corpora- tion. New York: Free Press, 2003.

Womack, James P., Daniel T. Jones, and Daniel Roos. The Machine that Changed the World. New York: Simon & Schuster, 1991, 2007.

SELECTED BIBLIOGRAPHY AND FURTHER

READINGS

ste24102_ch14_604-639.indd 639ste24102_ch14_604-639.indd 639 11/14/13 10:32 AM11/14/13 10:32 AM

Final PDF to printer

640

Maintaining the production capability of an organization is an important function in any pro- duction system. Maintenance encompasses all those activities that relate to keeping facilities and equipment in good working order and making necessary repairs when breakdowns occur, so that the system can perform as intended.

Maintenance activities are often organized into two categories: (1) buildings and grounds and (2) equipment maintenance. Buildings and grounds is responsible for the appearance and functioning of buildings, parking lots, lawns, fences, and the like. Equipment maintenance is responsible for maintaining machinery and equipment in good working condition and making all necessary repairs.

14S.1 INTRODUCTION The goal of maintenance is to keep the production system in good working order at minimal cost. There are several reasons for wanting to keep equipment and machines in good operating condition, such as to

1. Avoid production or service disruptions.

2. Not add to production or service costs.

3. Maintain high quality.

4. Avoid missed delivery dates.

Maintenance  All activities that maintain facilities and equipment in good working order so that a system can perform as intended.

LO14S.1 Explain the importance of maintenance in production systems.

SUPPLEMENT TO

C H A P T E R 14 SUPPLEMENT OUTLINE

14S.1 Introduction, 640

14S.2 Preventive Maintenance, 642

14S.3 Breakdown Programs, 644

14S.4 Replacement, 644

Maintenance LEARNING OBJECTIVES After completing this supplement, you should be able to: LO14S.1 Explain the importance of

maintenance in production systems.

LO14S.2 Describe the range of maintenance activities.

LO14S.3 Discuss preventive maintenance and the key issues associated with it.

LO14S.4 Explain breakdown maintenance and name the key issues associated with it.

LO14S.5 State how the Pareto phenomenon pertains to maintenance decisions.

ste24102_ch14s_640-647.indd 640ste24102_ch14s_640-647.indd 640 11/19/13 1:54 PM11/19/13 1:54 PM

Final PDF to printer

Supplement to Chapter Fourteen Maintenance 641

When breakdowns occur, there are a number of adverse consequences:

1. Operations capacity is reduced, and orders are delayed.

2. There is no output, but overhead continues, increasing the cost per unit.

3. There are quality issues; output may be damaged.

4. There are safety issues; employees or customers may be injured.

Decision makers have two basic options with respect to maintenance. One option is reac- tive: It is to deal with breakdowns or other problems when they occur. This is referred to as breakdown maintenance . The other option is proactive: It is to reduce breakdowns through a program of lubrication, adjustment, cleaning, inspection, and replacement of worn parts. This is referred to as preventive maintenance .

Decision makers try to make a trade-off between these two basic options that will mini- mize their combined cost. With no preventive maintenance, breakdown and repair costs would be tremendous. Furthermore, hidden costs, such as lost output and the cost of wages while equipment is not in service, must be factored in. So must the cost of injuries or damage to other equipment and facilities or to other units in production. However, beyond a certain point, the cost of preventive maintenance activities exceeds the benefit.

As an example, if a person never had the oil changed in his or her car, never had it lubri- cated, and never had the brakes or tires inspected, but simply had repairs done when abso- lutely necessary, preventive costs would be negligible but repair costs would be quite high, considering the wide range of parts (engine, steering, transmission, tires, brakes, etc.) that could fail. In addition, property damage and injury costs might be incurred, plus there would be the uncertainty of when failure might occur (e.g., on the expressway during rush hour, or late at night). On the other hand, having the oil changed and the car lubricated every morning would obviously be excessive because automobiles are designed to perform for much longer periods without oil changes and lubrications. The best approach is to seek a balance between preventive maintenance and breakdown maintenance. The same concept applies to maintain- ing production systems: Strike a balance between prevention costs and breakdown costs. This concept is illustrated in Figure 14S.1 .

The age and condition of facilities and equipment, the degree of technology involved, the type of production process, and similar factors enter into the decision of how much preventive maintenance is desirable. Thus, in the example of a new automobile, little preventive main- tenance may be needed since there is slight risk of breakdowns. As the car ages and becomes worn through use, the desirability of preventive maintenance increases because the risk of breakdown increases. Thus, when tires and brakes begin to show signs of wear, they should

Breakdown maintenance   Reactive approach; dealing with breakdowns or problems when they occur.

Preventive maintenance   Proactive approach; reducing breakdowns through a program of lubrication, adjustment, cleaning, inspection, and replacement of worn parts.

FIGURE 14S.1 Total maintenance cost as a function of preventive maintenance effort

Optimum

Cost

Amount of preventive maintenance

Total cost

Preventive maintenance cost

Breakdown and repair cost

ste24102_ch14s_640-647.indd 641ste24102_ch14s_640-647.indd 641 11/19/13 1:54 PM11/19/13 1:54 PM

Final PDF to printer

642 Supplement to Chapter Fourteen Maintenance

be replaced before they fail; dents and scratches should be periodically taken care of before they begin to rust; and the car should be lubricated and have its oil changed after exposure to high levels of dust and dirt. Also, inspection and replacement of critical parts that tend to fail suddenly should be performed before a road trip to avoid disruption of the trip and costly emergency repair bills.

14S.2 PREVENTIVE MAINTENANCE The goal of preventive maintenance is to reduce the incidence of breakdowns or failures in the plant or equipment to avoid the associated costs. Those costs can include loss of output; idle workers; schedule disruptions; injuries; damage to other equipment, products, or facilities; and repairs, which may involve maintaining inventories of spare parts, repair tools and equip- ment, and repair specialists.

Preventive maintenance is periodic. It can be scheduled according to the availability of maintenance personnel and to avoid interference with operating schedules. Managers usually schedule preventive maintenance using some combination of the following:

1. The result of planned inspections that reveal a need for maintenance.

2. According to the calendar (passage of time).

3. After a predetermined number of operating hours.

An important issue in preventive maintenance is the frequency of preventive maintenance. As the time between periodic maintenance episodes increases, the cost of preventive main- tenance decreases while the risk (and cost) of breakdowns increases. As noted, the goal is to strike a balance between the two costs (i.e., to minimize total cost).

Determining the amount of preventive maintenance to use is a function of the expected fre- quency of breakdown, the cost of a breakdown (including actual repair costs as well as poten- tial damage or injury, lost production, and so on). The following two examples illustrate this.

LO14S.2 Describe the range of maintenance activities.

The frequency of breakdown of a machine per month is shown in the table. The cost of a breakdown is $1,000 and the cost of preventive maintenance is $1,250 per month. If preven- tive maintenance is performed, the probability of a machine breakdown is negligible. Should the manager use preventive maintenance, or would it be cheaper to repair the machine when it breaks down?

Number of breakdowns 0 1 2 3

Frequency of occurrence .20 .30 .40 .10

e celx mhhe.com/stevenson12e

EXAMPLE 14S–1

S O L U T I O N The expected number of breakdowns without preventive maintenance is 1.40:

Number of Breakdowns �  

Frequency of Occurrence �

Expected Number of Breakdowns

0 .20 0 1 .30 .30 2 .40 .80 3 .10 .30 1.00 1.40

Expected cost using repair policy is 1.40 breakdowns/month  �  $1,000/breakdown  �  $1,400. Preventive maintenance would cost $1,250.

Therefore, preventive maintenance would yield a savings of $150/month.

ste24102_ch14s_640-647.indd 642ste24102_ch14s_640-647.indd 642 11/19/13 1:54 PM11/19/13 1:54 PM

Final PDF to printer

Supplement to Chapter Fourteen Maintenance 643

Ideally, preventive maintenance will be performed just prior to a breakdown or failure because this will result in the longest possible use of facilities or equipment without a break- down. Predictive maintenance is an attempt to determine when to perform preventive main- tenance activities. It is based on historical records and analysis of technical data to predict when a piece of equipment or part is about to fail. The better the predictions of failures are, the more effective preventive maintenance will be. A good preventive maintenance effort relies on complete records for each piece of equipment. Records must include information such as date of installation, operating hours, dates and types of insurance, and dates and types of repairs.

Some companies have workers perform preventive maintenance on the machines they operate, rather than use separate maintenance personnel for that task. Called total productive maintenance , this approach is consistent with JIT systems and lean operations, where employees are given greater responsibility for quality, productivity, and the general function- ing of the system.

In the broadest sense, preventive maintenance extends back to the design and selection stage of equipment and facilities. Maintenance problems are sometimes designed into a system. For example, equipment may be designed in such a way that it needs frequent maintenance, or maintenance may be difficult to perform (e.g., the equipment has to be partially dismantled in order to perform routine maintenance). An extreme example of this was a certain car model that required the engine block to be lifted slightly in order to change the spark plugs! In such cases, maintenance is very likely to be performed less often than if its performance were less demanding. In other instances, poor design can cause equipment to wear out at an early age or experience a much higher than expected breakdown rate. Consumer Reports, for example, publishes annual breakdown data on automobiles. The data indicate that some models tend to break down with a much higher frequency than other models.

One possible reason for maintenance problems being designed into a product is that designers have considered other aspects of design more important. Cost is one such aspect. Another is appearance; an attractive design may be chosen over a less attractive one even though it will be more demanding to maintain. Customers may contribute to this situation; the buying public probably has a greater tendency to select an attractive design over one that offers ease of maintenance.

Obviously, durability and ease of maintenance can have long-term implications for preven- tive maintenance programs. Training of employees in proper operating procedures and in how to keep equipment in good operating order—and providing the incentive to do so—are also important. More and more, U.S. organizations are taking a cue from the Japanese and trans- ferring routine maintenance (e.g., cleaning, adjusting, inspecting) to the users of equipment,

Predictive maintenance  An attempt to determine when best to perform preventive maintenance activities.

Total productive maintenance  JIT approach where workers perform preventive maintenance on the machines they operate.

S O L U T I O N Begin by computing the ratio of preventive cost to the breakdown cost:

Preventive cost

Breakdown cost

$250

$1,000 .25� �

Find the number of standard deviations from the mean represented by an area under the nor- mal curve equal to .25 using Appendix B, Table B. It is � .67. Use this value of z to compute the maintenance interval:

zMean standard deviations 3 .67(.60) 2.598 (round to 2.6 weeks)� � � �

Another approach that might be used relates to the time before a breakdown occurs. Suppose that the average time before breakdown is normally distributed and has a mean of 3 weeks and a standard deviation of .60 week. If breakdown cost averages $1,000 and preventive mainte- nance costs $250, what is the optimal maintenance interval?

EXAMPLE 14S–2

ste24102_ch14s_640-647.indd 643ste24102_ch14s_640-647.indd 643 11/19/13 1:54 PM11/19/13 1:54 PM

Final PDF to printer

644 Supplement to Chapter Fourteen Maintenance

in an effort to give them a sense of responsibility and awareness of the equipment they use and to cut down on abuse and misuse of the equipment.

14S.3 BREAKDOWN PROGRAMS The risk of a breakdown can be greatly reduced by an effective preventive maintenance program. Nonetheless, occasional breakdowns still occur. Even firms with good preven- tive practices have some need for breakdown programs. Of course, organizations that rely less on preventive maintenance have an even greater need for effective ways of dealing with breakdowns.

Unlike preventive maintenance, management cannot schedule breakdowns but must deal with them on an irregular basis (i.e., as they occur). Among the major approaches used to deal with breakdowns are the following:

1. Standby or backup equipment that can be quickly pressed into service.

2. Inventories of spare parts that can be installed as needed, thereby avoiding lead times involved in ordering parts, and buffer inventories, so that other equipment will be less likely to be affected by short-term downtime of a particular piece of equipment.

3. Operators who are able to perform at least minor repairs on their equipment.

4. Repair people who are well trained and readily available to diagnose and correct prob- lems with equipment.

The degree to which an organization pursues any or all of these approaches depends on how important a particular piece of equipment is to the overall operations system. At one extreme is equipment that is the focal point of a system (e.g., printing presses for a newspaper, or vital operating parts of a car, such as brakes, steering, transmission, ignition, and engine). At the other extreme is equipment that is seldom used because it does not perform an impor- tant function in the system, and equipment for which substitutes are readily available.

The implication is clear: Breakdown programs are most effective when they take into account the degree of importance a piece of equipment has in the operations system, and the ability of the system to do without it for a period of time. The Pareto phenomenon exists in such situations: A relatively few pieces of equipment will be extremely important to the func- tioning of the system, thereby justifying considerable effort and/or expense; some will require moderate effort or expense; and many will justify little effort or expense.

14S.4 REPLACEMENT When breakdowns become frequent and/or costly, the manager is faced with a trade-off deci- sion in which costs are an important consideration: What is the cost of replacement com- pared with the cost of continued maintenance? This question is sometimes difficult to resolve, especially if future breakdowns cannot be readily predicted. Historical records may help to project future experience. Another factor is technological change; newer equipment may have features that favor replacement over either preventive or breakdown maintenance. On the other hand, the removal of old equipment and the installation of new equipment may cause disruptions to the system, perhaps greater than the disruptions caused by breakdowns. Also, employees may have to be trained to operate the new equipment. Finally, forecasts of future demand for the use of the present or new equipment must be taken into account. The demand for the replacement equipment might differ because of the different features it has. For instance, demand for output of the current equipment might be two years, while demand for output of the replacement equipment might be much longer.

These decisions can be fairly complex, involving a number of different factors. Neverthe- less, most of us are faced with a similar decision with our personal automobiles: When is it time for a replacement?

LO14S.3 Discuss preventive maintenance and the key issues associated with it.

LO14S.4 Explain breakdown maintenance and name the key issues associated with it.

ste24102_ch14s_640-647.indd 644ste24102_ch14s_640-647.indd 644 11/19/13 1:54 PM11/19/13 1:54 PM

Final PDF to printer

Supplement to Chapter Fourteen Maintenance 645

breakdown maintenance, 641 maintenance, 640

predictive maintenance, 643 preventive maintenance, 641

total productive maintenance, 643

KEY TERMS

Maintaining the productive capability of an organization is an important function. Maintenance includes all of the activities related to keeping facilities and equipment in good operating order and maintaining the appearance of buildings and grounds.

The goal of maintenance is to minimize the total cost of keeping the facilities and equipment in good working order. Maintenance decisions typically reflect a trade-off between preventive maintenance, which seeks to reduce the incidence of breakdowns and failures, and breakdown maintenance, which seeks to reduce the impact of breakdowns when they do occur.

SUMMARY

1. What is the goal of a maintenance program?

2. List the costs associated with equipment breakdown.

3. What are three different ways preventive maintenance is scheduled?

4. Explain the term predictive maintenance and the importance of good records.

5. List the major approaches organizations use to deal with breakdowns.

6. Explain how the Pareto phenomenon applies to a. Preventive maintenance. b. Breakdown maintenance.

7. Discuss the key points of this supplement as they relate to maintenance of an automobile.

8. What advantages does preventive maintenance have over breakdown maintenance?

9. Explain why having a good preventive maintenance program in place is necessary prior to imple- menting a lean system.

10. Discuss the relationship between preventive maintenance and quality.

DISCUSSION AND REVIEW QUESTIONS

1. The probability that equipment used in a hospital lab will need recalibration is given in the follow- ing table. A service firm is willing to provide maintenance and provide any necessary calibrations for a fee of $650 per month. Recalibration costs $500 per time. Which approach would be most cost-effective, recalibration as needed or the service contract?

2. The frequency of breakdown of a machine that issues lottery tickets is given in the following table. Repairs cost an average of $240. A service firm is willing to provide preventive maintenance under either of two options: #1 is $500 and covers all necessary repairs, and #2 is $350 and covers any repairs after the first one. Which option would have the lower expected cost: pay for all repairs, ser- vice option #1, or service option #2?

3. Determine the optimum preventive maintenance frequency for each of the pieces of equipment if breakdown time is normally distributed:

PROBLEMS

Number of Breakdowns/Month 0 1 2 3 4

Frequency of Occurrence .10 .30 .30 .20 .10

Number of Recalibrations 0 1 2 3 4

Probability of Occurrence .15 .25 .30 .20 .10

Equipment Preventive

Maintenance Cost Breakdown

Cost

A201 $300 $2,300

B400 $200 $3,500

C850 $530 $4,800

Equipment Average Time (days)

between Breakdowns Standard Deviation

A201 20 2

B400 30 3

C850 40 4

ste24102_ch14s_640-647.indd 645ste24102_ch14s_640-647.indd 645 11/19/13 1:54 PM11/19/13 1:54 PM

Final PDF to printer

646 Supplement to Chapter Fourteen Maintenance

Hall, Robert W. “Total Productive Maintenance— Essential to Maintain Progress.” Target 3, no. 3 (Fall 1987), pp. 4–11.

http://www.epa.gov/lean/environment/methods/tpm.htm

Mann, Lawrence, Jr. Maintenance Management. Rev. ed. Lexington, MA: Lexington Books, 1983.

Mather, D. “The Value of RCM.” Plant Services, 2008.

Nolden, Carol. “Predictive Maintenance: Route to Zero Unplanned Downtime.” Plant Engineering 41, no. 4 (February 1987), pp. 38–43.

SELECTED BIBLIOGRAPHY AND FURTHER READINGS

ste24102_ch14s_640-647.indd 646ste24102_ch14s_640-647.indd 646 11/19/13 1:54 PM11/19/13 1:54 PM

Final PDF to printer

This page intentionally left blank

648

C H A P T E R

15

After completing this chapter, you should be able to:

LO15.1 Explain the terms supply chain and logistics.

LO15.2 Name the key aspects of supply chain management.

LO15.3 List, and briefly explain, current trends in supply chain management.

LO15.4 Outline the benefits and risks related to outsourcing.

LO15.5 Explain what the main supply chain risks are and what businesses can do to minimize those risks.

LO15.6 Describe some of the complexities related to global supply chains.

LO15.7 Briefly describe ethical issues in supply chains and the key steps companies can take to avoid ethical problems.

LO15.8 Describe the three concerns of small businesses related to the supply chain and suggest ways to manage those concerns.

LO15.9 List several strategic, tactical, and operational responsibilities related to managing the supply chain.

LO15.10 Discuss procurement in terms of the purchasing interfaces, the purchasing cycle, ethics, and centralized versus decentralized decision making.

LO15.11 Briefly describe the key aspects of supplier management.

LO15.12 Discuss the logistics aspects of supply chain management, including RFID technology.

LO15.13 Discuss the issues involved in managing returns.

LO15.14 Describe some of the challenges in creating an effective supply chain and some of the trade-offs involved.

Supply Chain Management

CHAPTER OUTLINE

15.1 Introduction, 649

15.2 Trends in Supply Chain Management, 653 Risk Management and Resiliency 654

Shortening the Supply Chain 656

15.3 Global Supply Chains, 656

15.4 ERP and Supply Chain Management, 656

15.5 Ethics and the Supply Chain, 657

15.6 Small Business 657

15.7 Management Responsibilities, 658 Strategic Responsibilities, 659

Key Tactical and Operational Responsibilities, 659

15.8 Procurement, 660 Purchasing Interfaces, 660

The Purchasing Cycle, 661

Centralized versus Decentralized Purchasing, 662

Ethics in Purchasing, 662

15.9 E-Business, 663

15.10 Supplier Management, 667 Choosing Suppliers, 667

Supplier Audits, 667

Supplier Certification, 668

Supplier Relationship Management, 668

Supplier Partnerships, 668

Strategic Partnering, 669

15.11 Inventory Management, 670

15.12 Order Fulfillment, 671

15.13 Logistics, 672 Movement within a Facility, 672

Operations Tour: Wegmans’ Shipping System, 673

Incoming and Outgoing Shipments, 674

Tracking Goods: RFID, 674

Evaluating Shipping Alternatives, 676

3-PL, 677

15.14 Creating an Effective Supply Chain, 678 Managing Returns, 679

Challenges, 681

15.15 Strategy, 683

Cases: MasterTag, 685

B & L Inc., 686

LEARNING OBJECTIVES

ste24102_ch15_648-687.indd 648ste24102_ch15_648-687.indd 648 11/14/13 10:39 AM11/14/13 10:39 AM

Final PDF to printer

649

In this chapter you will learn about recent trends in supply chain management, key supply chain processes and management responsibilities, procurement, logistics, managing returns, managing risks, and creating an effective supply chain. You can get an indication of the impor- tance of supply chains from this statistic: According to one estimate, the value of inventories in supply chains of U.S. companies is over a trillion dollars. 1

15.1 INTRODUCTION A supply chain is the sequence of organizations—their facilities, functions, and activities— that are involved in producing and delivering a product or service. The sequence begins with basic suppliers of raw materials and extends all the way to the final customer. Facilities include warehouses, factories, processing centers, distribution centers, retail outlets, and offices. Functions and activities include forecasting, purchasing, inventory management,

Supply chain  A sequence of organizations—their facilities, functions, and activities—that are involved in producing and delivering a product or service.

1 “What in the World is the Global Supply Chain?” Video, Council of Supply Chain Management Professionals, 2005.

The Wegmans supermarket chain (see the Wegmans Operations Tour in Chapter 1) is often mentioned as being one of the best-run super- market chains in the United States. It’s now being mentioned for its leadership in supply chain management in the grocery industry. When a Wegmans spokesperson was asked how many of its people work in its supply chain, the spokesperson essentially said all of them.

The fact of the matter is that most if not all of the people who work in any business organization are somehow involved with the supply chain. And no matter where your career takes you, in every job you do, you’ll be involved in one (or more) supply chain(s).

ste24102_ch15_648-687.indd 649ste24102_ch15_648-687.indd 649 11/14/13 10:39 AM11/14/13 10:39 AM

Final PDF to printer

650 Chapter Fifteen Supply Chain Management

information management, quality assurance, scheduling, production, distribution, delivery, and customer service.

Supply chain management is the strategic coordination of business functions within a business organization and throughout its supply chain for the purpose of integrating supply and demand management. Supply chain managers are people at various levels of the organiza- tion who are responsible for managing supply and demand both within and across business organizations. They are involved with planning and coordinating activities that include sourcing and procurement of materials and services, transformation activities, and logistics.

Logistics is the part of a supply chain involved with the forward and reverse flow of goods, services, cash, and information. Logistics management includes management of inbound and outbound transportation, material handling, warehousing, inventory, order fulfillment and dis- tribution, third-party logistics, and reverse logistics (the return of goods from customers).

Every business organization is part of at least one supply chain, and many are part of multiple supply chains. Often the number and type of organizations in a supply chain are determined by whether the supply chain is manufacturing or service oriented. Figure 15.1 illustrates several

LO15.1 Explain the terms supply chain and logistics.

Supply chain management   The strategic coordination of the supply chain for the purpose of integrating supply and demand management.

Logistics  The movement of goods, services, cash, and information in a supply chain.

FIGURE 15.1 Typical supply chains

Supplier

Supplier Storage

Storage

Supplier

Supplier

Supplier

Mfg. Storage Distributor Retailer

Service Customer

Customer

Production

Logistics

SUPPLY CHAIN

Reverse Logistics

Customers

Suppliers

Consumers

Cash flow

Product/Service Design

Marketing

Goods and services

Transportationa. A typical manufacturing supply chain.

b. A typical service supply chain.

c. Goods and services flow clockwise in this diagram, and cash flows counter- clockwise. Information flows in both directions.

ste24102_ch15_648-687.indd 650ste24102_ch15_648-687.indd 650 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 651

perspectives of supply chains. Figure 15.2 shows a more detailed version of the farm-to-market supply chain that was shown in Chapter 1, with key suppliers at each stage included.

Supply chains are sometimes referred to as value chains, a term that reflects the concept that value is added as goods and services progress through the chain. Supply or value chains typically comprise separate business organizations, rather than just a single organization. Moreover, the supply or value chain has two components for each organization: a supply component and a demand component. The supply component starts at the beginning of the chain and ends with the internal operations of the organization. The demand component of the chain starts at the point where the organization’s output is delivered to its immediate customer and ends with the final customer in the chain. The demand chain is the sales and distribu- tion portion of the value chain. The length of each component depends on where a particular organization is in the chain; the closer the organization is to the final customer, the shorter its demand component and the longer its supply component.

Supply chains are the lifeblood of any business organization. They connect suppliers, producers, and final customers in a network that is essential to the creation and delivery of goods and services. Managing the supply chain is the process of planning, implementing, and controlling supply chain operations. The basic components are strategy, procurement, supply management, demand management, and logistics. The goal of supply chain management is to match supply to demand as effectively and efficiently as possible. Key aspects relate to:

1. Determining the appropriate level of outsourcing.

2. Managing procurement.

3. Managing suppliers.

4. Managing customer relationships.

5. Being able to quickly identify problems and respond to them.

LO15.2 Name the key aspects of supply chain management.

FIGURE 15.2 A farm-to-market supply chain

Supermarket

Bakery

Mill

Farm

Bread $1.29

Farm Suppliers:

Trucking

Trucking

Trucking

Equipment suppliers Equipment repair Feed, seed, fertilizers, pesticides Energy/fuel

Bakery Suppliers:

Equipment suppliers Equipment repair Other ingredients Energy

Trucking Suppliers:

Fuel Repairs Tires Drivers

Mill Suppliers:

Equipment suppliers Equipment repair Energy

ste24102_ch15_648-687.indd 651ste24102_ch15_648-687.indd 651 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

652 Chapter Fifteen Supply Chain Management

An important aspect of supply chain management is flow management. The three types of flow that need to be managed are product and service flow, information flow, and financial flow. Product and service flow involves the movement of goods or services from suppliers to customers as well as handling customer service needs and product returns. Information flow involves sharing forecast and sales data, transmitting orders, tracking shipments, and updating order status. Financial flow involves credit terms, payments, and consignment and title owner- ship arrangements. Technological advances have greatly enhanced the ability to effectively man- age these flows. A dramatic decrease in the cost of transmitting and receiving information and the increased ease and speed of communication have facilitated the ability to coordinate supply chain activities and make timely decisions. In effect, a supply chain is a complex supply network.

Think food distribution is a low-tech enterprise? Just try getting a box of lettuce and other perishables across the country without sophisticated software and systems. When people hear the name “Sysco,” they probably think of Cisco, the San Jose–based maker of routers and other high-tech gear. But Houston-based food distributor Sysco, which each year ships 21.5 million tons of produce, meats, prepared meals, and other food-related products, is pretty technologically savvy too. The company supplies goods to one in three U.S. restaurants, cafeterias, and sports stadiums—anyplace that serves food. To get all that food safely to the right venue at the right time, Sysco maintains a complex web of software, databases, scanning systems, and robotics that surely would impress Silicon Valley types (including executives from that homonymic company).

Sysco’s supply-chain logistics are especially complex because a single jar of caviar can’t be handled the same way as a box of frozen onion rings or an 80-pound tub of flour. That rules out most off-the-shelf inventory-management software. So Sysco uses customized tech tools to crank out a logistical plan every day and then execute it. That way a restaurant that wants Fuji apples doesn’t get Macintoshes instead, or an elementary school cafeteria doesn’t end up with meals meant for the assisted-living facility down the street. In the process, the company has found ways to cut costs and speed delivery times, which is helping Sysco weather a downturn that is forcing many of its restaurant cus- tomers to cut back or close altogether.

Food Sorting the Sysco Way On a recent afternoon around 5:40, a whirring noise picks up, punc- tuated by honks as men drive forklifts across the floor of Sysco’s 450,000-square-foot facility in Jersey City, N.J. This is where restau- rant supplies and food are sorted and loaded before reaching their final destination. (Sysco refers to each of its sorting centers as an “operating company.”) Every driver is wearing a wireless scanner made by Symbol, a unit of Motorola, plus a printer on his hip with exact instructions on what to load on his forklift. Sysco has software that calculates exactly how each pallet—a forklift can accommodate three of the large portable

READING Veggie Tales

(Continued)

platforms—should be arranged, based on the weight of its items, its location, and its destination.

“It’s like the game of Tetris,” says the facility’s vice president of operations, Robert Heim, who says hello to everyone who drives by.

The “selectors,” as the men are called, point their scanners at a bar code above an item, grab it, and put it on a pallet. The facility is arranged so that people work methodically in one direction, never doubling back, which could create chaos. The aisles are organized according to weight and temperature; heavier cans that weigh 40 to 50 pounds are put on one side of the warehouse, while lighter items, like boxes of potato chips, go on the other. It’s all about maximum efficiency.

At this location 11,000 items turn over every 17 days. To achieve that, each product—even the napkins and silverware—has a kind of expiration date on it, because Sysco wants everything to move out in a particular order. If an item passes its “expiration,” the inventory-man- agement software alerts workers to pull it. Or if supplies of it are run- ning low, they are replenished.

Fuller Trucks Hit the Roads Thanks to the geographic spread and diversity of its customers, Sys- co’s trucks are seemingly everywhere. To make sure the trucks are as full as can be, Sysco in 2000 began revamping its supply-chain operations. In the past Sysco had its food suppliers—such as Kraft and Kellogg—ship directly to operating centers like the one in Jersey City. The problem was that suppliers were sending a separate truck to each operating company. Not only did each truck take 2½ hours to unload, but they often arrived only half full. The upshot: Sysco, which covers these suppliers’ delivery costs, was wasting time and money. Today a centralized supply-chain group in Houston, with the help of

ste24102_ch15_648-687.indd 652ste24102_ch15_648-687.indd 652 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 653

15.2 TRENDS IN SUPPLY CHAIN MANAGEMENT Although different industries and different businesses vary widely in terms of where they are in the evolution of their supply chain management, many businesses emphasize the following:

• Measuring supply chain ROI.

• “Greening” the supply chain.

• Reevaluating outsourcing.

• Integrating IT.

• Adopting lean principles.

• Managing risks.

Measuring supply chain ROI enables managers to incorporate economics into outsourcing and other decisions, giving them a rational basis for managing their supply chains.

Greening the supply chain is generating interest for a variety of reasons, including corporate responsibility, regulations, and public pressure. This may involve redesigning products and services; reducing packaging; near-sourcing to reduce pollution from transportation (one estimate is that marine shipping alone causes about 60,000 premature deaths annually worldwide due to lung cancer and cardiopulmonary disease); 2 choosing “green” suppliers; managing returns; and implementing end-of-life programs, particularly for appliances and electronic equipment.

Reevaluating outsourcing. Companies are taking a second look at outsourcing, especially global suppliers. Business organizations outsource for a variety of reasons. Often decisions to outsource have been based on lower prices resulting from lower labor costs. Other potential benefits include: the ability to focus on core strengths, converting fixed costs to variable costs, freeing up capital to devote to other needs, shifting some risks to suppliers, taking advantage of supplier expertise, and ease of expansion outside the home country. Some potential dif- ficulties, depending on the nature of what is outsourced and the length of the supply chain, include inflexibility due to longer lead times for delivery of goods with distant suppliers, increased transportation costs, language and cultural differences, loss of jobs, loss of control,

LO15.3 List, and briefly explain, current trends in sup- ply change management.

LO15.4 Outline the benefits and risks related to outsourcing.

software from Manhattan Associates, directs shipments from suppliers to one of two new redistribution centers, where Sysco workers consoli- date and pack into trucks large quantities of supplies before sending them on to the appropriate operating companies. In some cases the redistribution centers can get pallets for customers packed and ready, so the operating companies need to assemble only a few more pallets before sending the truck out for delivery. The result: Fewer trucks on the road—each one fuller—and Sysco spends less time turning prod- ucts around. Sysco says that in the first three quarters of last year it increased shipped cases per employee (a key metric of efficiency) 5%.

Sysco has also saved money by revamping its truck routes. That became imperative last year when fuel prices skyrocketed. It uses Roadnet, a software program developed by UPS, to determine the most efficient routes for its trucks. In the past nine months, the company says, diesel usage is down almost 8% from a year earlier. It also is

trying to get all its units to coordinate by moving to an SAP software platform, which should take a few more years to complete.

Total Recall Sysco’s technology not only helps the company run more efficiently, it can aid government agencies after outbreaks related to tainted food. When the Food and Drug Administration ordered the recall of salmonella-contaminated peanut products supplied by Peanut Corp. of America last year, Sysco quickly identified six operating companies that potentially carried tainted goods. The company says it also used its tracking software to help the FDA investigate the sources of contamina- tion by triangulating information about its shipments, eateries that had reported outbreaks, and the suspected ingredients. Using that kind of information, Sysco also helped health officials identify sources of con- tamination during the 2006 spinach E. coli outbreak.

2 James J. Corbett, James J. Winebrake, Erin H. Green, Prasad Kasibhatla, Veronika Eyring, and Axel Lauer, “Mortality from Ship Emissions: A Global Assessment,” Environmental Science & Technology 41, no. 24 (December 15, 2007), pp. 8512–8518.

ste24102_ch15_648-687.indd 653ste24102_ch15_648-687.indd 653 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

654 Chapter Fifteen Supply Chain Management

lower productivity, loss of ability to do the work internally and loss of business knowledge, knowledge transfer, concerns about intellectual property security, and increased effort needed to manage the supply chain.

One example of where this is getting increased attention is the clothing industry. Rising wages in China and other countries where suppliers make most of the clothing for retail sales provide less of a cost benefit than previously, and long lead times eliminate agility in an industry where the market rewards it. Add in instances of late deliveries and substandard quality, and events like factory fires and building collapses, and the decision to back-shore becomes easier to consider.

Integrating IT produces real-time data that can enhance strategic planning and help businesses to control costs, measure quality and productivity, respond quickly to problems, and improve sup- ply chain operations. This is why ERP systems are so important for supply chain management.

Managing risks. For some businesses, the supply chain is a major source of risk, so it is essential to adopt procedures for managing risks. According to a Deloitte survey, 3 45 percent of supply chain leaders lack confidence in their risk management. The following section dis- cusses sources of risk and actions businesses can take to reduce risks.

Many businesses are turning to lean principles to improve the performance of their supply chains. In too many instances, traditional supply chains are a collection of loosely connected steps, and business processes are not linked to suppliers’ or customers’ needs. Applying lean principles to supply chains can overcome this weakness by eliminating non- value-added processes; improving product flow by using pull systems rather than push sys- tems; using fewer suppliers and supplier certification programs, which can nearly eliminate the need for inspection of incoming goods; and adopting the lean attitude of never ceasing to improve the system.

As a result of these current and possible future trends, organizations are likely to give serious thought to reconfiguring their supply chains to reduce risks, improve flow, increase profits, and generally increase customer satisfaction.

Risk Management and Resiliency Risk management involves identifying risks, assessing their likelihood of occurring and their potential impact, and then developing strategies for addressing those risks. Strategies can

LO15.5 Explain what the main supply chain risks are and what businesses can do to minimize those risks.

Supply chain disruptions can reduce revenue and threaten production and distribution. A risk from accidents is shown here with containers falling from the deck of a damaged cargo ship off the Mumbai coast after a collision between two cargo ships

3 Deloitte Survey: “Executives Face Growing Threats to Their Supply Chains.” New York: Press release, February 7, 2013.

ste24102_ch15_648-687.indd 654ste24102_ch15_648-687.indd 654 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 655

pertain to risk avoidance, risk reduction, and risk sharing with supply chain partners. Risk avoidance may mean not dealing with suppliers in a certain area, risk reduction can mean replacing unreliable suppliers, and risk sharing can mean contractual arrangements with sup- ply chain partners that spread the risk. Resiliency is the ability of a business to recover from an event that negatively impacts the supply chain. Recovery is a function of the severity of the impact and the plans that are in place to cope with the event. Businesses can reduce, but not eliminate, the need for resiliency by managing risks.

The first step in risk management is to identify potential risks. Supply chain risks fall into several categories. One is disruptions, which can come from natural disasters such as fires, flooding, hurricanes and the like that either disrupt shipping or that affect suppliers directly (by damaging production or storage facilities) or indirectly (by impacting access to facilities or impacting employees in other ways). Other disruptions can occur as a result of supplier issues such as labor strife, production problems, and issues with their suppliers, including bankruptcy. Another source of risk is quality issues, which can disrupt supplies and may lead to product recalls, liability claims, and negative publicity. Still another risk is the potential for suppliers divulging sensitive information to competitors that weakens a competitive advantage.

Key elements of successful risk management include:

Know your suppliers. Mapping the supply chain can be helpful in grasping the scope of the supply chain, identifying suppliers, and seeing if there are any supplier concentra- tions in first or second tiers of suppliers, which can greatly amplify risk. This might also lead to the desirability of simplifying (shortening) the supply chain.

Provide supply chain visibility. Supply chain visibility means that a major trading partner can connect to any part of its supply chain to access data in real time on inventory levels, shipment status, and similar key information. This requires data sharing.

Develop event-response capability. Event-response capability is the ability to detect and respond to unplanned events such as delayed shipment or a warehouse running low on a certain item. An event management system should have four capabilities: monitoring the system; notifying when certain planned or unplanned events occur; simulating poten- tial solutions when an unplanned event occurs; and measuring the long-term performance of suppliers, transporters, and other supply chain partners.

Event response can mean identifying alternate sources of supply. It should also be some- what general to be able to deal with the possibility of unknown disruptions, which are events that cannot generally be predicted, but which can, if they do occur, have an impact on the

Resiliency  The ability of a business to recover from an event that negatively impacts the supply chain.

Supply chain visibility   A major trading partner can connect to its supply chain to access data in real time.

Event-response capability   The ability to detect and respond to unplanned events.

Situations like this can arise when busi- nesses acquire other companies and then elect to maintain their processing operations in their current locations.

Questions 1. Businesses sometimes acquire widely dispersed processing facili-

ties through a number of mergers or acquisitions. What trade-offs might they face in considering consolidation?

2. This reading offers one possible reason for the existence of a long supply process. Can you think of some other possible reasons for long supply processes?

Based on: “3M Begins Untangling Their Hairballs.” The Wall Street Journal, May 17, 2012.

One of 3M’s many products is a plastic hook. Production occurred at several widely scattered locations in the Midwest. The process started in a Springfield, Missouri, plant that made adhesives, which were then shipped about 550 miles to a plant in Hartford City, Indiana, where the adhesive was applied to foam. Next, the foam was shipped another 600 miles to a plant in near Minneapolis, Minnesota, where the foam was cut into individual pieces and imprinted with the 3M logo. Finally the foam pieces were shipped to a plant in central Wisconsin, another 200 miles or so, were they were bundled with the hooks and packages for sale. This entire process took over a hundred days and over 1,000 miles to complete.

3M eventually consolidated operations in a single plant in Hutchinson, Minnesota, where a number of other 3M products are made. That elimi- nated all the travel and reduced the process time by two-thirds.

READING At 3M, a Long Road Became a Shorter Road

ste24102_ch15_648-687.indd 655ste24102_ch15_648-687.indd 655 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

656 Chapter Fifteen Supply Chain Management

supply chain. Because these are unknowns, the severity and length of a disruption are impos- sible to predict. Consequently, it is important to recognize that unforeseen events could occur, and to have a plan for addressing them should they occur.

Simplify (shorten) the supply chain if need be. The following section discusses this important topic.

Shortening the Supply Chain As businesses search for ways to reduce transportation time and cost, some are placing more emphasis on using nearby suppliers, storage facilities, and processing centers. Others are finding savings by consolidating their supply chains, as described in the following reading.

15.3 GLOBAL SUPPLY CHAINS As businesses increasingly make use of outsourcing and pursue opportunities beyond their domestic markets, their supply chains are becoming increasingly global. For example, prod- uct design often uses inputs from around the world, and products are sold globally.

As businesses recognize the strategic importance of effective supply chain management, they are also discovering that global supply chains have additional complexities that were either negligible or nonexistent in domestic operations. These complexities include language and cultural differences, currency fluctuations, armed conflicts, increased transportation costs and lead times, and the increased need for trust and cooperation among supply chain partners. Furthermore, managers must be able to identify and analyze factors that differ from country to country, which can affect the success of the supply chain, including local capabilities; financial, transportation, and communication infrastructures; governmental, environmental, and regulatory issues; and political issues.

These and other factors have made risk management an important aspect of global supply chain management. To compensate for this, some firms have increased the amount of inven- tory at various points in their supply chains, thereby losing some of the benefits of global sourcing.

Risks can relate to supply (e.g., supplier failure, quality issues, sustainability issues, trans- portation issues, pirates, terrorism), costs (e.g., increasing commodity costs), and demand (e.g., decreasing demand, demand volatility, and transportation issues). Still other risks can involve intellectual rights issues, contract compliance issues, competitive pressure, forecast- ing errors, and inventory management.

A positive factor of globalization has been the set of technological advances in communi- cations: the ability to link operations around the world with real-time information exchange. Consequently, information technology has a key role in integrating operations across global supply chains.

15.4 ERP AND SUPPLY CHAIN MANAGEMENT Supply chain management that integrates ERP is a formal approach to effectively plan and manage all the resources of a business enterprise. Implementation of ERP involves establish- ing operating systems and operating performance measurements to enable them to manage business operations and meet business and financial objectives. ERP encompasses supply chain management activities such as planning for demand and managing supply, inventory replenishment, production, warehousing, and transportation. ERP software also plays a key role in centralizing transaction data.

ERP software provides the ability to coordinate, monitor, and manage a supply chain. It is an integrated system that provides for system-wide visibility of key activities and events in areas such as supplier relationships, performance management, sales and order fulfillment, and customer relationships.

LO15.6 Describe some of the complexities related to global supply chains.

ste24102_ch15_648-687.indd 656ste24102_ch15_648-687.indd 656 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 657

Supplier Relationship Management ERP integrates purchasing, receiving, information about vendor ratings and performance, lead times, quality, electronic funds disbursements, simplifying processes, and enabling analysis of those processes.

Performance Management This aspect of ERP pulls together information on costs and profits, productivity, quality performance, and customer satisfaction.

Sales and Order Fulfillment ERP includes the ability to provide inventory and quality management, track returns, and schedule and monitor production, packaging, and distribu- tion. Reports can provide information on order and inventory status, delivery dates, and logis- tics performance.

Customer Relationship Management An ERP system not only centralizes basic con- tact information, details on contracts, payment terms, credit history, and shipping preferences, it also provides information on purchasing patterns, service, and returns.

15.5 ETHICS AND THE SUPPLY CHAIN There are many examples of unethical behavior involving supply chains. They include bribing government or company officials to secure permits or favorable status; “exporting smoke- stacks” to developing countries; claiming a “green” supply chain when in reality the level of “green” is only minimal; ignoring health, safety, and environmental standards; violating basic rights of workers (e.g., paying substandard wages; using sweatshops, forced labor, or child labor); mislabeling country of origin; and selling goods abroad that are banned at home.

Every company should develop an ethical supply chain code to guide behavior. A code should cover behaviors that involve customers, suppliers, suppliers’ behaviors, contract negotiation, recruiting, and the environmental issues.

A major risk of unethical behavior is that when such behavior is exposed in the media, consumers tend to blame the major company or brand in the supply chain associated with the ethical infractions that were actually committed by legally independent companies in the supply chain. The problem is particularly difficult to manage when supply chains are global, as they often are in manufacturing operations. Unfortunately, many companies lack the ability to quickly contact most or all of the companies in their supply chain, and com- municate with suppliers on critical issues of ethics and compliance. Although monitoring of supply chain activities is essential, it is only one aspect of maintaining an ethical supply chain. With global manufacturing and distribution, supply chain scrutiny should include all supply chain activities from purchasing, manufacturing, assembly, and transportation, to service and repair operations, and eventually to proper disposal of products at the end of their useful life.

Key steps companies can take to reduce the risk of damages due to unethical supplier behavior are to choose those that have a reputation for good ethical behavior; incorporate compliance with labor standards in supplier contracts; develop direct, long-term relationships with ethical suppliers; and address quickly any problems that occur.

15.6 SMALL BUSINESSES Small businesses do not always give adequate attention to their supply chains. However, there are many benefits to be had for small businesses by actively managing their supply chains, including increased efficiencies, reduced costs, reduced risks, and increased profits. And size can actually be a competitive advantage for small businesses because they often are more agile than larger companies, enabling them to make decisions and changes more quickly when the need arises.

LO15.7 Briefly describe ethical issues in supply chains and the key steps companies can take to avoid ethical problems.

LO15.8 Describe the three concerns of small businesses related to the supply chain and suggest ways to manage those concerns.

ste24102_ch15_648-687.indd 657ste24102_ch15_648-687.indd 657 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

658 Chapter Fifteen Supply Chain Management

Three aspects of supply chain management that are often of concern to small busi- nesses are:

• Inventory management

• Reducing risks

• International trade

Inventories can be an issue for small businesses. They may carry extra inventory as a way to avoid shortages due to supply chain interruptions. However, that can tie up capital and take up space. An alternative is to have backup suppliers for critical items. Similarly, having backups for delivery from suppliers and deliveries to customers can help overcome disruptions. Because it can take a fair amount of time to set up accounts, it is prudent to have these systems in place before they are needed to maintain operations.

Another area that often needs attention is risk management. The key to reducing risks is managing suppliers. Important steps are:

• Use only reliable suppliers.

• Determine which suppliers are critical; get to know them, and any challenges they have.

• Measure supplier performance (e.g., quality, reliability, flexibility).

• Recognize warning signs of supplier issues (e.g., late deliveries, incomplete orders, quality problems).

• Have plans in place to manage supply chain problems.

Exporting can offer opportunities for small business producers to greatly expand their businesses, although they typically lack the knowledge to do so, which can cause unforeseen problems. For instance, exporting nonconforming goods or packaging can result in shipments being held up at a port of entry, which can be costly and time-consuming, and can lead to dissatisfied customers.

Importing can have benefits for small businesses. The Small Business Administration has some tips for using foreign suppliers: 4

• Work with someone who has expertise to help oversee foreign suppliers, preferably someone who spends a good deal of time in that country. Also, a licensed customs broker can help with laws and regulations, necessary documents, and working with importers and exporters.

• Describe your buying patterns and schedules to set expectations for demand and timing.

• Don’t rely on a single supplier; a backup supplier can reduce risk and provide bargaining leverage.

• Building goodwill can have benefits in negotiations and resolving problems when they arise.

• Consider using domestic suppliers if the risks or other issues with foreign suppliers are formidable. Advantages can involve lower shipping times and costs, closer interactions with suppliers, and increased agility.

15.7 MANAGEMENT RESPONSIBILITIES Generally speaking, corporate management responsibilities have legal, economic, and ethical aspects. Legal responsibilities include being knowledgeable about laws and reg- ulations of the countries where supply chains exist, obeying the laws, and operating to conform to regulations. Economic responsibilities include supplying products and

4 U.S. Small Business Administration, “5 Tips for Managing an Efficient Global Supply Chain,” Small Business Operations, March 12, 2013.

ste24102_ch15_648-687.indd 658ste24102_ch15_648-687.indd 658 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 659

services to meet demand as efficiently as possible. Ethical responsibilities include con- ducting business in ways that are consistent with the moral standards of society.

More specific areas of responsibility relate to organizational strategy, tactics, and operations.

SOME SUPPLY CHAIN STRATEGIES There are many different strategies a business organization can choose from. Here is a sample of some of those strategies:

Responsive/agile. A flexible supply chain that has the ability to quickly respond to changes in product requirements or volume of demand as well as adapt to supply chain disruptions.

Lean supply chain. Focused on eliminating non-value-added activities to create an efficient, low-cost supply chain.

Near-sourcing. Using nearby suppliers shortens the supply chain, reducing transportation time and cost, reducing supply chain inventory, reducing the risk of disruptions, and increasing responsiveness.

Purchasing is “critical to supply chain efficiency because it is the job of purchasing to select suppliers and then establish mutu- ally beneficial relationships with them. Without good suppliers and without superior purchasing, supply chains cannot compete in today’s marketplace.” Purchasing is also very involved in product design and development work. Many “manufacturers have found out that manufacturing costs can be reduced, product quality maximized,

and new products brought to market at a much faster rate if purchas- ing brings key suppliers into the product design and development at the earliest stage of the process.” And purchasing is directly involved in the implementation of e-commerce systems.

Source: Based on Kevin R. Fitzgerald, “Purchasing Occupies Key Position in Supply Chains,” Supply Chain Yearbook 2000 (New York: Cahners Business Information, 2000), p. 21.

Strategic Responsibilities Top management has certain strategic responsibilities that have a major impact on the suc- cess not only of supply chain management but also of the business itself. These strategies include:

Supply chain strategy alignment: Aligning supply and distribution strategies with organizational strategy and deciding on the degree to which outsourcing will be employed.

Network configuration: Determining the number and location of suppliers, warehouses, production/operations facilities, and distribution centers.

Information technology: Integrating systems and processes throughout the supply chain to share information, including forecasts, inventory status, tracking of shipments, and events.

Products and services: Making decisions on new product and services selection and design.

Capacity planning: Assessing long-term capacity needs, including when and how much will be needed and the degree of flexibility to incorporate.

Strategic partnerships: Partnership choices, level of partnering, and degree of formality.

Distribution strategy: Deciding whether to use centralized or decentralized distribution, and deciding whether to use the organization’s own facilities and equipment for distribu- tion or to use third-party logistics providers.

Uncertainty and risk reduction: Identifying potential sources of risk and deciding the amount of risk that is acceptable.

Key Tactical and Operational Responsibilities The key tactical and operational responsibilities are outlined in Table 15.1 .

LO15.9 List several strategic, tactical, and operational responsibilities related to managing the supply chain.

ste24102_ch15_648-687.indd 659ste24102_ch15_648-687.indd 659 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

660 Chapter Fifteen Supply Chain Management

15.8 PROCUREMENT The purchasing department of an organization is responsible for obtaining the materials, parts, supplies, and services needed to produce a product or provide a service. You can get some idea of the importance of purchasing when you consider that, in manufacturing, upwards of 60 percent of the cost of finished goods comes from purchased parts and materials. Further- more, the percentages for purchased inventories are even higher for retail and wholesale com- panies, sometimes exceeding 90 percent. Nonetheless, the importance of purchasing is more than just the cost of goods purchased; other important factors include the quality of goods and services and the timing of deliveries of goods or services, both of which can have a significant impact on operations.

Among the duties of purchasing are identifying sources of supply, negotiating contracts, maintaining a database of suppliers, obtaining goods and services that meet or exceed opera- tions requirements in a timely and cost-efficient manner, and managing suppliers.

Purchasing Interfaces Purchasing has interfaces with a number of other functional areas, as well as with outside sup- pliers. It is the connecting link between the organization and its suppliers. In this capacity, it exchanges information with suppliers and functional areas. The interactions between purchas- ing and these other areas are briefly summarized in the following paragraphs.

Operations constitute the main source of requests for purchased materials, and close cooperation between these units and the purchasing department is vital if quality, quantity, and delivery goals are to be met. Cancellations, changes in specifications, or changes in quan- tity or delivery times must be communicated immediately for purchasing to be effective.

The purchasing department may require the assistance of the legal department in contract negotiations, in drawing up bid specifications for nonroutine purchases, and in helping inter- pret legislation on pricing, product liability, and contracts with suppliers.

Accounting is responsible for handling payments to suppliers and must be notified promptly when goods are received in order to take advantage of possible discounts. In many firms, data processing is handled by the accounting department, which keeps inventory records, checks invoices, and monitors vendor performance.

LO15.10 Discuss procurement in terms of the purchasing interfaces, the purchasing cycle, ethics, and centralized versus decentralized decision making.

Tactical Responsibilities Forecasting: Prepare and evaluate forecasts. Sourcing: Choose suppliers and some make-or-buy decisions. Operations planning: Coordinate the external supply chain and internal operations. Managing inventory: Decide where in the supply chain to store the various types of inventory

(raw materials, semifinished goods, finished goods). Transportation planning: Match capacity with demand. Collaborating: Work with supply chain partners to coordinate plans.

Operational Responsibilities Scheduling: Short-term scheduling of operations and distribution. Receiving: Management of inbound deliveries from suppliers. Transforming: Conversion of inputs into outputs. Order fulfilling: Linking production resources and/or inventory to specific customer orders. Managing inventory: Maintenance and replenishment activities. Shipping: Management of outbound deliveries to distribution centers and/or customers. Information sharing: Exchange of information with supply chain partners. Controlling: Control of quality, inventory, and other key variables and implementing corrective action,

including variation reduction, when necessary.

TABLE 15.1 Key tactical and operational responsibilities

ste24102_ch15_648-687.indd 660ste24102_ch15_648-687.indd 660 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 661

Design and engineering usually prepare material specifications, which must be commu- nicated to purchasing. Because of its contacts with suppliers, purchasing is often in a position to pass information about new products and materials improvements on to design person- nel. Also, design and purchasing people may work closely to determine whether changes in specifications, design, or materials can reduce the cost of purchased items (see the following section on value analysis).

Receiving checks incoming shipments of purchased items to determine whether quality, quantity, and timing objectives have been met, and it moves the goods to temporary storage. Purchasing must be notified when shipments are late; accounting must be notified when shipments are received so that payments can be made; and both purchasing and accounting must be apprised of current information on continuing vendor evaluation.

Suppliers or vendors work closely with purchasing to learn what materials will be pur- chased and what kinds of specifications will be required in terms of quality, quantity, and deliveries. Purchasing must rate vendors on cost, reliability, and so on (see the later section on vendor analysis). Good supplier relations can be important on rush orders and changes, and vendors provide a good source of information on product and material improvements.

Figure 15.3 depicts the purchasing interfaces.

The Purchasing Cycle The purchasing cycle begins with a request from within the organization to purchase mate- rial, equipment, supplies, or other items from outside the organization, and the cycle ends when the purchasing department is notified that a shipment has been received in satisfactory condition. The main steps in the cycle are these:

1. Purchasing receives the requisition. The requisition includes ( a ) a description of the item or material desired, ( b ) the quantity and quality necessary, ( c ) desired delivery dates, and ( d ) who is requesting the purchase.

2. Purchasing selects a supplier. The purchasing department must identify suppliers who have the capability of supplying the desired goods. If no suppliers are currently listed in the files, new ones must be sought. Vendor ratings may be referred to in choosing among vendors, or perhaps rating information can be relayed to the vendor with the thought of upgrading future performance.

Purchasing cycle  Series of steps that begin with a request for purchase and end with noti- fication of shipment received in satisfactory condition.

FIGURE 15.3 Purchasing interfaces

The firm

Legal

Accounting

Design

Receiving

Operations

Data processingPurchasing

Suppliers

ste24102_ch15_648-687.indd 661ste24102_ch15_648-687.indd 661 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

662 Chapter Fifteen Supply Chain Management

3. Purchasing places the order with a vendor. If the order involves a large expenditure, particularly for a one-time purchase of equipment, for example, vendors will usually be asked to bid on the job, and operating and design personnel may be asked to assist in negotiations with a vendor. Large-volume, continuous-usage items may be covered by blanket purchase orders, which often involve annual negotiation of prices with deliveries subject to request throughout the year. Moderate-volume items may also have blanket purchase orders, or they may be handled on an individual basis. Small purchases may be handled directly between the operating unit requesting a purchased item and the sup- plier, although some control should be exercised over those purchases so they don’t get out of hand.

4. Monitoring orders. Routine follow-up on orders, especially large orders or those with lengthy lead times, allows the purchasing department to project potential delays and relay that information to the operating units. Conversely, the purchasing department must communicate changes in quantities and delivery needs of the operating units to suppliers to allow them time to change their plans.

5. Receiving orders. Receiving must check incoming shipments for quality and quantity. It must notify purchasing, accounting, and the operating unit that requested the goods. If the goods are not satisfactory, they may have to be returned to the supplier or subjected to further inspection.

Centralized versus Decentralized Purchasing Purchasing can be centralized or decentralized. Centralized purchasing means that purchasing is handled by one special department. Decentralized purchasing means that individual depart- ments or separate locations handle their own purchasing requirements.

Centralized purchasing may be able to obtain lower prices than decentralized units if the higher volume created by combining orders enables it to take advantage of quantity discounts offered on large orders. Centralized purchasing may also be able to obtain better service and closer attention from suppliers. In addition, centralized purchasing often enables companies to assign certain categories of items to specialists, who tend to be more efficient because they are able to concentrate their efforts on relatively few items instead of spreading themselves across many items.

Decentralized purchasing has the advantage of awareness of differing “local” needs and being better able to respond to those needs. Decentralized purchasing usually can offer quicker response than centralized purchasing. Where locations are widely scattered, decen- tralized purchasing may be able to save on transportation costs by buying locally, which has the added attraction of creating goodwill in the community.

Some organizations manage to take advantage of both centralization and decentraliza- tion by permitting individual units to handle certain items while centralizing purchases of other items. For example, small orders and rush orders may be handled locally or by depart- ments, while centralized purchases would be used for high-volume, high-value items for which discounts are applicable or specialists can provide better service than local buyers or departments.

Ethics in Purchasing Ethical behavior is important in all aspects of business. This is certainly true in purchas- ing, where the temptations for unethical behavior can be enormous. Buyers often hold great power, and salespeople are often eager to make a sale. Unless both parties act in an ethical manner, the potential for abuse is very real. Furthermore, with increased globalization, the challenges are particularly great because a behavior regarded as customary in one country might be regarded as unethical in another country.

The National Association of Purchasing Management has established a set of guidelines for ethical behavior. (See Table 15.2 .) As you read through the list, you get insight into the scope of ethics issues in purchasing.

Centralized purchasing   Purchasing is handled by one special department.

Decentralized purchasing   Individual departments or separate locations handle their own purchasing requirements.

ste24102_ch15_648-687.indd 662ste24102_ch15_648-687.indd 662 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 663

15.9 E-BUSINESS The commercial blossoming of the Internet has led to an explosion of Internet-related activities, many of which have a direct impact on organizations’ supply chains, even if those organizations aren’t themselves users of the Internet. E-business refers to the use of

E-business The use of electronic technology to facilitate business transactions.

PRINCIPLES Integrity in Your Decisions and Actions

Value for Your Employer Loyalty to Your Profession

STANDARDS

1. Perceived Impropriety. Prevent the intent and appearance of unethical or compromising conduct in relationships, actions, and communications.

2. Conflicts of Interest. Ensure that any personal, business, or other activity does not conflict with the lawful interests of your employer.

3. Issues of Influence. Avoid behaviors or actions that may negatively influence, or appear to influence, supply management decisions.

4. Responsibilities to Your Employer. Uphold fiduciary and other responsibilities using reasonable care and granted authority to deliver value to your employer.

5. Supplier and Customer Relationships. Promote positive supplier and customer relationships.

6. Sustainability and Social Responsibility. Champion social responsibility and sustainability practices in supply management.

7. Confidential and Proprietary Information. Protect confidential and proprietary information.

8. Reciprocity. Avoid improper reciprocal agreements.

9. Applicable Laws, Regulations, and Trade Agreements. Know and obey the letter and spirit of laws, regulations, and trade agreements applicable to supply management.

10. Professional Competence. Develop skills, expand knowledge, and conduct business that demonstrates competence and promotes the supply management profession.

TABLE 15.2 Guidelines for ethical behavior in purchasing

Reprinted with permission from the pub- lisher. The Institute for Supply Manage- ment ™ , Principles and Standards of Ethical Supply Management Conduct. Adopted January 2012.

We have always maintained an open chan- nel of communications with suppliers to set expectations. Today, in an increasingly inter- connected world market, the expectations for all players across the entire supply chain go up. Therefore, we are both reaffirming our exist- ing policies and instituting some new practices, which are spelled out in the following Supplier Conduct Principles. These principles establish for our suppliers the minimum standards we expect from them as a condition of doing business with IBM. IBM will have the right to take action with suppliers that fail to comply with these principles, including terminating our relationship with them.

Source: Reprinted courtesy of International Business Machines Corporation. Copyright © 2008 International Business Machines Corporation.

From its inception almost a century ago, IBM has been based on a set of fundamental values. IBM’s values shape and define our company and permeate all of our relationships—between our company’s people and our shareholders, our clients, the communities where our people live and work, and among our network of suppliers.

Within our supply chain relationships, we know that our company’s sizable purchasing power is a unique resource that we must manage responsibly, and we do. IBM spends nearly $2 billion a year with diverse suppliers, for example, greater than any other technology company. Yet more than managing our spending, we have a responsibility to hold ourselves—and our suppliers—to high standards of behavior. This means complying with all applicable laws and regulations. But it goes beyond that. It entails a strong commitment to work with suppliers to encourage sound practices and develop sound global markets.

READING IBM’s Supply Chain Social Responsibility

ste24102_ch15_648-687.indd 663ste24102_ch15_648-687.indd 663 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

664 Chapter Fifteen Supply Chain Management

electronic technology to facilitate business transactions. E-business, or e-commerce, involves the interaction of different business organizations as well as the interaction of individuals with business organizations. Applications include Internet buying and selling, e-mail, order and shipment tracking, and electronic data interchange. In addition, companies use e-business to promote their products or services, and to provide information about them. Delivery firms have seen the demand for their services increase dramatically due to e-business. Among them are giants UPS and FedEx.

Table 15.3 lists some of the numerous advantages of e-business. There are two essential features of e-business: the Web site and order fulfillment. Compa-

nies may invest considerable time and effort in front-end design (the Web site), but the back end (order fulfillment) is at least as important. It involves order processing, billing, inventory management, warehousing, packing, shipping, and delivery.

Many of the problems that occur with Internet selling are supply related. The ability to order quickly creates an expectation in customers that the remainder of the process will pro- ceed smoothly and quickly. But the same capability that enables quick ordering also enables demand fluctuations that can inject a certain amount of chaos into the system, almost guar- anteeing that there won’t be a smooth or quick delivery. Oftentimes the rate at which orders come in via the Internet greatly exceeds an organization’s ability to fulfill them. Not too long ago, Toys “R” Us had that experience during the busy Christmas season; it ended up offering thousands of disappointed customers a $100 coupon to make up for it.

In the early days of Internet selling, many organizations thought they could avoid bearing the costs of holding inventories by acting solely as intermediaries, having their suppliers ship directly to their customers. Although this approach worked for some companies, it failed for others, usually because suppliers ran out of certain items. This led some companies to rethink the strategy. Industry giants such as Amazon.com and Barnesandnoble.com built huge ware- houses around the country so they could maintain greater control over their inventories. Still others are outsourcing fulfillment, turning over that portion of their business to third-party fulfillment operators such as former catalog fulfillment company Fingerhut, now a unit of Federated Department Stores.

Companies and publishers have a global presence and the customer has global choices and easy access to information.

Companies can improve competitiveness and quality of service by allowing access to their services any place, any time. Companies also have the ability to monitor customers’ choices and requests electronically.

Companies can analyze the interest in various products based on the number of hits and requests for information.

Companies can collect detailed information about clients’ preferences, which enables mass customization and personalized products. An example is the purchase of PCs over the Web, where the buyer specifies the final configuration.

Supply chain response times are shortened. The biggest impact is on products that can be delivered directly on the Web, such as forms of publishing and software distribution.

The roles of the intermediary and sometimes the traditional retailer or service provider are reduced or elimi- nated entirely in a process called disintermediation. This process reduces costs and adds alternative purchasing options.

Substantial cost savings and substantial price reductions related to the reduction of transaction costs can be realized. Companies that provide purchasing and support through the Web can save significant personnel costs.

E-commerce allows the creation of virtual companies that distribute only through the Web, thus reducing costs. Amazon.com and other net vendors can afford to sell for a lower price because they do not need to maintain retail stores and, in many cases, warehouse space.

The playing field is leveled for small companies that lack significant resources to invest in infrastructure and marketing.

Source: Reprinted by permission from David Simchi-Levi, Philip Kaminsky, and Edith Simchi-Levi, Designing and Managing the Supply Chain: Concepts, Strategies, and Case Studies (New York: Irwin/McGraw-Hill, 2000), p. 235.

TABLE 15.3 Advantages of e-business

ste24102_ch15_648-687.indd 664ste24102_ch15_648-687.indd 664 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 665

Using third-party fulfillment means losing control over fulfillment. It might also result in fulfillers substituting their standards for the company they are serving, and using the ful- filler’s shipping price structure. On the other hand, an e-commerce company may not have the resources or infrastructure to do the job itself. Another alternative might be to form a strategic partnership with a bricks-and-mortar company. This can be a quick way to jump-start an e-commerce business. In any case, somewhere in the supply chain there has to be a bricks- and-mortar facility.

A growing portion of e-business involves business-to-business (B2B) commerce rather than business-to-consumer commerce. To facilitate business-to-business commerce, B2B marketplaces are created. Table 15.4 describes B2B marketplace enablers.

B2B exchanges can improve supply chain visibility to trading partners from a single point of access, facilitating the development of common standards and data formats for schedules, product codes, location codes, and performance criteria. And e-businesses focusing on transportation services can benefit from having an efficient hub for collaboration between shippers and transportation providers, helping to translate customer shipment forecasts into more predictable demand for equipment, and enabling carriers to deploy their equipment more effectively.

Fingerhut is now a major e-commerce fulfill- ment player, thanks as much to its massive data warehouse of customer information as to its four million square feet of high-tech warehouse space.

In addition to handling its own business, Fingerhut handles the back end of other high-volume retailers, such as Walmart and eToys. Their massive warehouse in St. Cloud, MN, can process as many as 30,000 items per hour.

Big shippers like UPS and FedEx have also successfully branched into e-commerce fulfillment. In addition to their traditional shipping niche, they’ll warehouse your inventory for you, handle all back-end tasks, and offer complete solutions including Web site design, devel- opment, and hosting. Their e-commerce edge came not only from their overnight, single-order delivery infrastructure, but also from hav- ing already developed package-tracking software.

Hiring a fulfillment giant is de rigueur these days for huge “click and bricks” retailers like Walmart and Pier One, who have to switch in a hurry from their old operating model of moving big pallets of goods to stores to moving single items to individuals.

Third-party fulfillers are treasured for their efficiencies and advanced technology. But some can be unresponsive and not always capable of supporting [clients’] software. There has also been some grumbling in Barron’s that the big third-party fulfillers are doomed middlemen, a mere transitory phase for e-commerce.

Source: Excerpted from Judith Silverstein, “Desperately Seeking E-Fulfillment,” Digital Chicago, November/December 1999, pp. 29 and 30.

READING Desperately Seeking E-Fulfillment

Behind the scenes of e-commerce: Order processing and fulfillment at Fingerhut.

ste24102_ch15_648-687.indd 665ste24102_ch15_648-687.indd 665 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

666 Chapter Fifteen Supply Chain Management

Type Description

Financial Provide financial and other resources for Web-enhanced commerce.

Technology Provide software, applications, and expertise necessary to create B2B marketplace.

Source: Adapted from Forbes, July 2000.

TABLE 15.4 B2B marketplace enablers

“In 1999, IBM did what would seem to be a near impossible task. It began doing business with 12,000 suppliers over the Internet—sending purchase orders, receiving invoices and paying suppliers, all using the World Wide Web as its transaction-processing network.”

Setting up 12,000 suppliers to do business on the Internet was rela- tively easy compared to the resistance of suppliers to link to IBM via EDI (electronic data interchange). Suppliers who didn’t have large contracts with IBM balked at EDI because of the expense of special software and a VAN (value-added network) that were needed to do EDI. No such prob- lem with using the Internet: Suppliers don’t need special software or a costly VAN to do business with IBM.

The Internet’s simplicity reduces costs for IBM and its suppliers. IBM estimated that it saved $500 million in 1999 by moving procurement to the Web, and believes that is only the tip of the iceberg. Much of the savings came from eliminating intermediaries. IBM uses the Web to manage multiple tiers of suppliers and as a tool to work with suppliers to improve quality and reduce costs.

But cost reduction was not the only reason IBM switched to Internet procurement. Web-based procurement is a key part of its supplier man- agement strategy: IBM sees great value in using the Internet to collabo- rate with suppliers and tap into their expertise much more rapidly than previously. “The Internet will also allow IBM to collaborate with suppli- ers over scheduling issues. If the company wants to increase production of a certain product it will be able to check with component suppliers and determine if suppliers can support the increase. If there are sched- ule cutbacks, [it] will be able to notify suppliers almost instantaneously and excess inventory can be avoided.”

And although supply chains are viewed as sequential, IBM doesn’t necessarily want to manage them that way. Rather, it wants to use the Internet to manage multiple tiers of suppliers simultaneously. An example of this is how it deals with CMs (contract manufacturers). The company sends forecasts and purchase orders to the CMs for the printed circuit boards they supply. It also gives all the component manu- facturers the requirements and they ship parts directly to the CM. The company estimates it saved in excess of $150 million in 1999. “The savings were the difference between contract manufacturers’ price for components used on the boards and IBM’s price that it had negotiated with component suppliers.”

Because the Internet is becoming crucial to IBM’s supplier- management strategies, IBM is trying to make it easier for suppliers

READING E-Procurement at IBM

to do business over the Web. The company has developed a Web-based portal to provide a single entry point to IBM. As is the case with most large companies, IBM has multiple interfaces with its suppliers, including engineering, quality, as well as purchasing, and typically sup- pliers have to connect to separate URLs (universal resource locators) in a company. IBM’s portal provides a single point of entry for suppliers, making it easier for suppliers to do business with IBM and increasing the speed of the supply chain. Speed is vitally important in the electron- ics industry due to very short product life cycles. If products don’t get to the market quickly, most of the profit opportunity is lost.

Still another benefit envisioned by IBM will be the ability to form strategic alliances with some of its suppliers. In the past, the fact that many suppliers used by IBM for its production processes were as far as 12,000 miles away made it difficult to build strategic alliances with them. IBM believes that using the Internet will strengthen relations and enable it to develop alliances.

“The Internet also will play an important role in IBM’s general pro- curement  .  .  . IBM was doing EDI with core production suppliers, but not with . . . other forms of general procurement. Purchasers were still faxing and phoning orders, which is timely and costly.”

Additional cost savings come from small volume, one-of-a-kind special purchases, because of the speed and ease of using the Internet.

Web-based procurement will eliminate mistakes that occur during the procurement process due to having to type or enter prices and other figures on paper documents.

Questions

1. How did IBM achieve cost reductions by using the Internet for procurement?

2. What advantage did IBM’s use of the Internet have for small suppliers?

3. Aside from cost reduction, what major value does IBM envision for its interaction with suppliers?

4. How does use of the Internet for procurement reduce mistakes? Indicate how using the Internet made that benefit possible.

5. How does having a Web-based portal help IBM’s suppliers?

Source: Based on James Carbone, “E-Procurement at IBM: POs Are Just the Beginning,” Purchasing 128, no. 4 (March 23, 2000), p. S50.

ste24102_ch15_648-687.indd 666ste24102_ch15_648-687.indd 666 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 667

15.10 SUPPLIER MANAGEMENT Reliable and trustworthy suppliers are a vital link in an effective supply chain. Timely deliver- ies of goods or services and high quality are just two of the ways that suppliers can contribute to effective operations. A purchasing manager may function as an “external operations man- ager,” working with suppliers to coordinate supplier operations and buyer needs.

In this section, various aspects of supplier management are described, including supplier audits, supplier certification, and supplier partnering. The section starts with an aspect that can have important ramifications for the entire organization: choosing suppliers.

Choosing Suppliers In many respects, choosing a vendor involves taking into account many of the same factors asso- ciated with making a major purchase (e.g., a car or stereo system). A company considers price, quality, the supplier’s reputation, past experience with the supplier, and service after the sale. The main difference is that a company, because of the quantities it orders and operations requirements, often provides suppliers with detailed specifications of the materials or parts it wants instead of buying items off the shelf, although most organizations buy standard items that way. The main factors a company takes into account when it selects a vendor are outlined in Table 15.5 .

Because different factors are important for different situations, purchasing must decide, with the help of operations, the importance of each factor (i.e., how much weight to give to each factor), and then rate potential vendors according to how well they can be expected to perform against this list. This process is called vendor analysis , and it is conducted periodi- cally, or whenever there is a significant change in the weighting assigned to the various factors.

Supplier Audits Periodic audits of suppliers are a means of keeping current on suppliers’ production (or ser- vice) capabilities, quality and delivery problems and resolutions, and suppliers’ performance on other criteria. If an audit reveals problem areas, a buyer can attempt to find a solution before more serious problems develop. Among the factors typically covered by a supplier audit are management style, quality assurance, materials management, the design process used, process improvement policies, and procedures for corrective action and follow-up.

Supplier audits are also an important first step in supplier certification programs.

LO15.11 Briefly describe the key aspects of supplier management.

Vendor analysis  Evaluating the sources of supply in terms of price, quality, reputation, and service.

Factor Typical Questions

Quality and quality assurance

What procedures does the supplier have for quality control and quality assurance?

Are quality problems and corrective actions documented? Flexibility How flexible is the supplier in handling changes in delivery schedules, quantity,

and product or service changes? Location Is the supplier nearby? Price Are prices reasonable given the entire package the supplier will provide? Is the supplier willing to negotiate prices? Is the supplier willing to cooperate to reduce costs? Product or service

changes How much advance notification does the supplier require for product or service

changes? Reputation and

financial stability What is the reputation of the supplier? How financially stable is the supplier?

Lead times and on-time delivery

What lead times can the supplier provide? What procedures does the supplier have for assuring on-time deliveries?

What procedures does the supplier have for documenting and correcting problems?

Other accounts Is the supplier heavily dependent on other customers, causing a risk of giving priority to those needs over ours?

TABLE 15.5 Choosing a supplier

ste24102_ch15_648-687.indd 667ste24102_ch15_648-687.indd 667 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

668 Chapter Fifteen Supply Chain Management

Supplier Certification Supplier certification is a detailed examination of the policies and capabilities of a supplier. The certification process verifies that a supplier meets or exceeds the requirements of a buyer. This is generally important in supplier relationships, but it is particularly important when buyers are seeking to establish a long-term relationship with suppliers. Certified suppliers are sometimes referred to as world class suppliers. One advantage of using certified suppliers is that the buyer can eliminate much or all of the inspection and testing of delivered goods. And although problems with supplier goods or services might not be totally eliminated, there is much less risk than with noncertified suppliers.

Rather than develop their own certification programs, some companies rely on standard indus- try certifications such as ISO 9000, perhaps the most widely used international certification.

Supplier Relationship Management Purchasing has the ultimate responsibility for establishing and maintaining good supplier relationships. The type of relationship is often related to the length of a contract between buyers and sellers. Short-term contracts involve competitive bidding. Companies post spec- ifications and potential suppliers bid on the contracts. Suppliers are kept at arm’s length, and the relationship is minimal. Business may be conducted through computerized interac- tion. Medium-term contracts often involve ongoing relationships. Long-term contracts often evolve into partnerships, with buyers and sellers cooperating on various issues that tend to benefit both parties. Increasingly, business organizations are establishing long-term relation- ships with suppliers in certain situations that are based on strategic considerations.

Some business organizations use supplier forums to educate potential suppliers about the organization’s policies and requirements and to enhance opportunities for receiving contracts. Others use supplier forums to share information, strengthen cooperation, and encourage joint thinking. And some organizations use a supplier code of conduct that requires suppliers to maintain safe working conditions, treat workers with respect and dignity, and have production processes that do not harm workers, customers, or the environment.

Business organizations are becoming increasingly aware of the importance of building good relationships with their suppliers. In the past, too many firms regarded their suppliers as adversaries and dealt with them on that basis. One lesson learned from the Japanese is that numerous benefits derive from good supplier relations, including supplier flexibility in terms of accepting changes in delivery schedules, quality, and quantities. Moreover, suppliers can often help identify problems and offer suggestions for solving them. Thus, simply choosing and switching suppliers on the basis of price is a very shortsighted approach to handling an ongoing need.

Keeping good relations with suppliers is increasingly recognized as an important factor in maintaining a competitive edge. Many companies are adopting a view of suppliers as part- ners. This viewpoint stresses a stable relationship with relatively few reliable suppliers who can provide high-quality supplies, maintain precise delivery schedules, and remain flexible relative to changes in productive specifications and delivery schedules. A comparison of the contrasting views of suppliers is provided in Table 15.6 .

Supplier Partnerships More and more business organizations are seeking to establish partnerships with other organi- zations in their supply chains. This implies fewer suppliers, longer-term relationships, sharing of information (forecasts, sales data, problem alerts), and cooperation in planning. Among the possible benefits are higher quality, increased delivery speed and reliability, lower inventories, lower costs, higher profits, and, in general, improved operations.

There are a number of obstacles to supplier partnerships, not the least of which is that because many of the benefits go to the buyer, suppliers may be hesitant to enter into such relationships. Suppliers may have to increase their investment in equipment, which might put a strain on cash flow. Another possibility is that the cultures of the buyer and supplier might be quite different and not lend themselves to such an arrangement.

ste24102_ch15_648-687.indd 668ste24102_ch15_648-687.indd 668 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 669

Strategic Partnering Strategic partnering occurs when two or more business organizations that have comple- mentary products or services that would strategically benefit the others agree to join so that each may realize a strategic benefit. One way this occurs is when a supplier agrees to hold inventory for a customer, thereby reducing the customer’s cost of holding the inventory, in exchange for the customer’s agreeing to a long-term commitment, thereby relieving the sup- plier of the costs that would be needed to continually find new customers, negotiate prices and services, and so on.

Collaborative planning, forecasting, and replenishment (CPFR) is a contractual agreement used to achieve supply chain integration by cooperative management of inventory in the sup- ply chain by major supply chain partners. It involves information sharing, forecasting, and joint decision making. If done well, it can lead to cost savings on inventory, logistics, and merchandising for the partners.

Strategic partnering  Two or more business organizations that have complementary products or services join so that each may realize a strategic benefit.

Aspect Adversary Partner

Number of suppliers Many; play one off against the others One or a few Length of relationship May be brief Long-term Low price Major consideration Moderately important Reliability May not be high High Openness Low High Quality May be unreliable; buyer inspects At the source; vendor certified Volume of business May be low due to many suppliers High Flexibility Relatively low Relatively high Location Widely dispersed Nearness is important for short lead

times and quick service

TABLE 15.6 Supplier as adversary versus supplier as partner

Glendale, CA—01/25/02—The NestléUSA—Beverage Division and Ocean Spray Cranberries, Inc., announced today that they have formed a long-term strategic operations alliance that will enable both companies to significantly increase manufacturing and supply chain efficiency, while maintaining high quality products for their respective juice businesses.

“Ocean Spray shares many of our same business values, in particular their commitment to high quality manufacturing standards,” said Mike Mitchell, President and General Manager of NestléUSA— Beverage Division. “By capitalizing upon each other’s best practices, we feel both Nestlé and Ocean Spray will be better equipped to grow in this highly aggressive juice category in which we compete.”

READING NestléUSA and Ocean Spray Form Strategic Operations Alliance

Within the strategic operations alliance, Nestlé will transition over time its manufactur- ing of Libby’s Juicy Juice and Libby’s Kerns Nectars to Ocean Spray facilities. The companies will also pursue collab- orative procurement of common raw and packaging materials, and com- mon operating supplies, as well as shared logistics to increase process efficiency across the supply chain.

“This alliance between two great companies creates a powerful synergy,” said Ocean Spray President and Chief Operating Officer Randy Papadellis. “By bringing Nestlé juice production into our plants and join- ing forces with them on purchasing and distribution, we will establish an economy of scale that will boost the profitability of both companies.”

With Ocean Spray leading the category of shelf stable juices and Libby’s Juicy Juice being the leader in 100% juice for kids, the operations alliance is expected to create added value of mutual benefit. The strategic operations alliance will be governed by a leadership team and an executive operating committee, both comprised of members from each company.

Source: www.Nestleusa.com , www.NestleNewsroom.com .

ste24102_ch15_648-687.indd 669ste24102_ch15_648-687.indd 669 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

670 Chapter Fifteen Supply Chain Management

15.11 INVENTORY MANAGEMENT Inventories are a key component of supply chains. Although inventory management is dis- cussed in more detail in several other chapters, certain aspects of inventory management are particularly important for supply chain management. They relate to the location of inventories in the supply chain, the speed at which inventory moves through the supply chain, and dealing with the effect of demand variability on inventories.

The location of inventories is an important factor for effective material flow through the chain and for order fulfillment. Often trade-offs must be made. One approach is to use cen- tralized inventories, which generally results in lower overall inventory than there would be if decentralized inventories were used, because with decentralized inventories, one location may be understocked while another location is overstocked. Conversely, decentralized locations can provide faster delivery and generally lower shipping costs.

The rate at which material moves through a supply chain is referred to as inventory velocity . The greater the velocity, the lower the inventory holding costs and the faster orders are filled and goods are turned into cash.

Without careful management, demand variations can easily cause inventory fluctuations to get out of control. Variations in demand at the consumer end of a supply chain tend to ripple backwards through the chain. Moreover, periodic ordering and reaction to shortages can mag- nify variations, causing inventories to oscillate in increasingly larger swings. This is known as the bullwhip effect , because the pattern of demand variation is analogous to the motion of a bullwhip in response to a slight jerking of the handle. Consequently, shortages and surpluses occur throughout the chain, resulting in higher costs and lower customer satisfaction, unless preventive action is taken. The bullwhip effect is illustrated in Figure 15.4 .

The causes of inventory variability can be not only demand variability but also factors such as quality problems, labor problems, unusual weather conditions, and delays in shipments of goods. Adding to this can be communication delays, incomplete communications, and lack of coordination of activities among organizations in the supply chain.

Still other factors can contribute to the bullwhip effect. They include forecast inaccuracies, overreaction to stockouts (customers often order more than they need after experiencing a shortage), order batching to save on ordering and transportation costs (e.g., full truckloads, economic lot sizes), sales incentives and promotions, and service and product mix changes, which can create uneven demand patterns, and liberal return policies.

Good supply chain management can overcome the bullwhip effect by strategic buffering of inventory, information sharing, and inventory replenishment based on needs. An example of strategic buffering would be holding the bulk of retail inventory at a distribution center rather than at retail outlets. That way, inventories of specific retail outlets can be replenished as needed based on point-of-sale information from retail outlets as well as information on retail outlet inventories.

This is sometimes accomplished using vendor-managed inventory (VMI) . Vendors track goods shipped to distributors and retail outlets, and monitor retail supplies, enabling the

Inventory velocity  The speed at which goods move through a supply chain.

Bullwhip effect  Inventory oscillations become progressively larger looking backward through the supply chain.

Vendor-managed inventory (VMI)  Vendors monitor goods and replenish retail inventories when supplies are low.

FIGURE 15.4 The bullwhip effect: demand variations begin at the customer end of the chain and become increasingly large as they radiate backward through the chain

Demand

Final customer

Backward effect

Initial supplier

ste24102_ch15_648-687.indd 670ste24102_ch15_648-687.indd 670 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 671

vendors to replenish inventories when supplies are low. The practice is common in the retail sector, and is also used in other phases of supply chains. VMI lets companies reduce overhead by shifting responsibility for owning, managing, and replenishing inventory to vendors. Not only do assets decrease, the amount of working capital needed to operate a business also decreases.

15.12 ORDER FULFILLMENT Order fulfillment refers to the processes involved in responding to customer orders. Fulfillment time can be an important criterion for customers. It is often a function of the degree of customization required. Here are some common approaches:

• Engineer-to-Order (ETO). With this approach, products are designed and built according to customer specifications. This approach is frequently used for large-scale construction projects, custom homebuilding, home remodeling, and for products made in job shops. The fulfillment time can be relatively lengthy because of the nature of the project, as well as the presence of other jobs ahead of the new one.

• Make-to-Order (MTO). With this approach, a standard product design is used, but production of the final product is linked to the final customer’s specifications. This approach is used by aircraft manufacturers such as Boeing. Fulfillment time is generally less than with ETO fulfillment, but still fairly long.

• Assemble-to-Order (ATO). With this approach, products are assembled to customer specifications from a stock of standard and modular components. Computer manufac- turers such as Dell operate using this approach. Fulfillment times are fairly short, often a week or less.

• Make-to-Stock (MTS). With this approach, production is based on a forecast, and products are sold to the customer from finished goods stock. This approach is used in department stores and supermarkets. The order fulfillment time is immediate. A variation of this is e-commerce; although goods have already been produced, there is a lag in fulfillment to allow for shipping.

Order fulfillment  The processes involved in responding to customer orders.

Employees assemble Boeing 777 airplanes on a moving production line at the company’s facility in Everett, Washington. Airplanes move slowly but at a steady pace toward completion and the hangar door. If there is a production problem along the route, the line stops, responsible teams are alerted, and the issue is addressed until it is resolved.

ste24102_ch15_648-687.indd 671ste24102_ch15_648-687.indd 671 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

672 Chapter Fifteen Supply Chain Management

15.13 LOGISTICS Logistics refers to the movement of materials, services, cash, and information in a supply chain. Materials include all of the physical items used in a production process. In addition to raw materials and work in process, there are support items such as fuels, equipment, parts, tools, lubricants, office supplies, and more. Logistics includes movement within a facility, overseeing incoming and outgoing shipments of goods and materials, and information flow throughout the supply chain.

Movement within a Facility Movement of goods within a manufacturing facility is part of production control. Figure 15.5 shows the many steps where materials move within a manufacturing facility:

1. From incoming vehicles to receiving.

2. From receiving to storage.

3. From storage to the point of use (e.g., a work center).

4. From one work center to the next or to temporary storage.

5. From the last operation to final storage.

6. From storage to packaging/shipping.

7. From shipping to outgoing vehicles.

In some instances, the goods being moved are supplies; in other instances, the goods are actual products or partially completed products; and in still other instances, the goods are raw materials or purchased parts.

LO15.12 Discuss the logistics aspects of supply chain management, including RFID technology.

Logistics  The movement of materials, services, cash, and information in a supply chain.

FIGURE 15.5 Movement within a facility

Work center Work center

Work center

Storage Work center

Storage

Receiving In

Out Shipping

Storage

Machines

ste24102_ch15_648-687.indd 672ste24102_ch15_648-687.indd 672 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 673

Movement of materials must be coordinated to arrive at the appropriate destinations at appropriate times. Workers and supervisors must take care so that items are not lost, stolen, or damaged during movement.

The Wegmans supermarket chain (see the Wegmans Operations Tour at the end of Chapter 1) has been cited as a leader in supply chain management in the grocery industry. Its distribution system provides a number of examples of strategies and tactics that contribute to its suc- cess in managing its supply chain.

Wegmans operates a number of warehouses that are used to supply its stores. Some warehouses stock grocery items, while others stock frozen foods, and still others stock bakery products, seasonal items, and/or produce. Even though all stores and warehouses are owned by Wegmans, the warehouses service the stores on a B2B basis.

Distribution Individual stores’ orders are generated automatically on a daily basis. These are directed to the appropriate warehouses. Order fulfillment begins when a warehouse downloads a store’s order to its information system. There are a variety of methods used to replenish stores’ inven- tories. Several of these avoid the need for warehouse storage, saving the company storage and handling costs. Those methods are

1. Cross-dock: A full inbound pallet is redirected to an outbound shipment.

2. Cross-distribution: An inbound pallet is broken down into cases right on the dock, and then the cases are immediately distributed to outbound pallets.

3. Vendor-managed inventory: Vendors of some non–store brand items such as bread and soft drinks handle replenishment, and those items come directly from the vendor’s warehouse to the stores.

Warehoused replenishment items are handled as full pallets, or bro- ken down into cases, depending on quantities ordered:

1. Block pick: An entire pallet of goods in the warehouse is placed on an outbound truck.

2. Case pick: Individual cases or packages are pulled from inventory, placed on pallets and shrink wrapped, and then placed on out- bound trucks.

Computerized information on incoming orders is checked against incoming shipments of stocks to determine which items can be filled using cross-docking or cross-distribution right in the loading area. These items are then subtracted from a store’s order. The remaining items are filled from warehouse supplies.

Warehoused Items Here is a brief description of retrieval of warehoused items in a dry goods (canned, boxed, etc.) warehouse: The system is semiautomated, and only a few workers are needed to process orders and monitor the system.

Warehoused items are classified for either con- veyor belt or non–conveyor belt handling. Items are designated for conveyor belt handling based on their packaging and vol- ume. If volume is low and packaging can withstand the conveyor belt, it will be assigned to the conveyor belt. If the packaging cannot withstand the conveyor belt, the items will be individually case-picked. Non–conveyor belt items that are high volume are automatically moved in bulk from their ware- house locations to a staging area to await loading onto an outbound truck.

When orders for conveyor belt items are received, a worker is given bar code labels that contain the number of the ordering store. The worker then goes to the section where an item is stored, affixes the appropriate store bar code, and places the item on the conveyor belt. As items move along the conveyer, their bar codes are scanned and they are sorted according to store number. After scanning and sorting, items move to staging areas where they are placed on pallets and shrink wrapped, and then placed in a slot designated for the appropri- ate store. The figure illustrates the handling of low-volume items.

OPERATIONS TOUR Wegmans’ Shipping System

k i d l

Receive an orderInformation systems

Conveyor items Non-conveyor items are placed at a store’s slot

Items are scanned and directed to a slot

of a particular store

Items are palletized and wrapped

Loaded on a truck and shipped to a particular store

Items are palletized and wrapped

FIGURE 1 Distribution Diagram

Continued

ste24102_ch15_648-687.indd 673ste24102_ch15_648-687.indd 673 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

674 Chapter Fifteen Supply Chain Management

Incoming and Outgoing Shipments Overseeing the shipment of incoming and outgoing goods comes under the heading of traffic management . This function handles schedules and decisions on shipping method and times, taking into account costs of various alternatives, government regulations, the needs of the organization relative to quantities and timing, and external factors such as potential shipping delays or disruptions (e.g., highway construction, truckers’ strikes).

Computer tracking of shipments often helps to maintain knowledge of the current status of shipments as well as to provide other up-to-date information on costs and schedules.

Tracking Goods: RFID Advances in technology are revolutionizing the way businesses track goods in their supply chains. Radio frequency identification (RFID) is a technology that uses radio waves to identify objects, such as goods in supply chains. This is done through the use of an RFID tag that is attached to an object. The tag has an integrated circuit and an antenna that project infor- mation or other data to network-connected RFID readers using radio waves. RFID tags can be attached to pallets, cases, or individual items. They provide unique identification, enabling businesses to identify, track, monitor, or locate practically any object in the supply chain that is within range of a tag reader. These tags are similar to bar codes, but they have the advan- tage of conveying much more information, and they do not require a line-of-sight for reading that bar codes require. And unlike bar codes, which must be scanned individually and usually manually, multiple RFID tags can be read simultaneously and automatically. Furthermore, an RFID tag provides more precise information than a bar code: Tags contain detailed infor- mation on each object, whereas bar codes convey only an object’s clas- sification, such as its stockkeeping unit (SKU). This enables manage- ment to know where every object is in the supply chain. RFID has the potential to fundamentally change the way companies track inventory and share information, and to dra- matically improve the management of supply chains. This technology increases supply chain visibility, improves inventory management, improves quality control, and enhances relationships with suppli- ers and customers.

Traffic management   Overseeing the shipment of incoming and outgoing goods.

Radio frequency identification (RFID)   A technology that uses radio waves to identify objects, such as goods in supply chains.

New Approaches Wegmans is now using RFID tags. The tags are very small micro chips, no bigger than a grain of salt. The tags are somewhat similar to bar codes, but offer greater potential for supply chain management because they can be more quickly read (e.g., multiple items can be scanned at once and, unlike bar codes, no line-of-sight is required for a read- ing), and scanning devices can be placed in warehouses and even on supermarket shelves that would warn when stocks of individual items are running low. The tags initially cost about $1 each, and currently cost about five cents each, making them cost effective for tracking shipments and bulk quantities of items, but still too costly to use on individual store items. However, they hold great promise for increasing supply chain visibility and event management capabilities.

Collaboration with Vendors A desire to improve conveyer belt transporting has led Wegmans to col- laborate with vendors in an effort to improve packaging design. Occa- sionally goods will fall off the belt, and those items have to be inspected to see if they have been damaged. Damaged goods not only are costly, but they are also lost from inventory and must be replaced. Improved packaging also increases the number of goods that can be handled with the conveyer system.

Forecasting Wegmans implemented a program of consistent low pricing. This program reduced the number of promotional and sale items, reduced much of the volatility in demand, and made forecasting and inventory planning easier.

ste24102_ch15_648-687.indd 674ste24102_ch15_648-687.indd 674 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 675

RFID eliminates the need for manual counting and bar-code scanning of goods at receiving docks, in warehouses, and on retail shelves. This eliminates errors and greatly speeds up the process. Tags could reduce employee and customer theft by placing readers at building exits and in parking lots. Still other advantages include increased accuracy in warehouse “picking” of items for shipping or for use in assembly operations, increased accuracy in dispensing drugs to patients in hospitals, and reduced surgical errors.

RFID may enable small, agile businesses to compete with larger, more bureaucratic busi- nesses that may be slow to adopt this new technology. Conversely, large businesses may be better able to afford the costs involved. These include the costs of the tags themselves as well as the cost of affixing individual tags, the cost of readers, and the cost of computer hardware and software to transmit and analyze the data generated.

The Springdale Farm is a demonstration farm located near Rochester, New York. One area of the farm is dedicated to advances in dairy cow management that involves a unique application of RFID technology. The farm has a milking parlor that features a robotic milking system that has been “trained” on a cow-by-cow basis so that it automati- cally adapts to the physical aspects of each particular cow. When a cow enters the milking parlor, it is immediately identified by its RFID tag, and the milking machine adjusts itself and then attaches itself to the cow for milking. The system includes a self-cleaning, laser-guided robot plus an automatic feeder, all managed by a software program tied

READING Springdale Farm

into RFID tags worn by the cows. The accompa- nying software keeps track of data regarding the cow’s health, history, milk production, and milk quality. It also allows the cows to be milked whenever they want, without human intervention, freeing workers to focus on other aspects of the operation of the farm. When a cow enters the milking parlor, it is bathed, and then the milking equipment automatically attaches itself to the cow and begins milking. Meanwhile, the cow is given a snack especially formulated for that cow. When the milking is complete, the machine detaches from the cow, the snack is withdrawn, the front door swings open, and the cow exits.

real-time information about what’s happening on store shelves. Here’s how the system would work:

The supply chain of the consumer packaged goods industry works well when sales are steady, but it often breaks down when confronted by a sudden surge in demand. RFID tags could change that by providing

READING RFID Tags: Keeping the Shelves Stocked

W alm

art inv

entory management system

Pr oc

ter & G

amble s upply chain software

A special offer causes Walmart shoppers to snap up boxes of Baby-Dry Pampers.

1

Each box of Pampers has an RFID tag. Shelf-mounted scanners alert the stockroom of urgent need for restock.

2 Walmart’s Inventory Management System tracks and links its in-store stock and its warehoused stock, prompting quicker replenishment and providing accurate real-time data.

3 The Walmart IMS is linked to the P&G Supply Chain Management System. Demand spikes reported by RFID tags are immediately visible throughout the supply chain.

4 P&G’s logistics software tracks its trucks with GPS locators, and tracks their contents with RFID tag readers. Regional managers can reroute trucks to fill urgent needs.

5 P&G suppliers also use RFID tags and readers on their raw materials, giving P&G visibility several tiers down the supply chain, and giving suppliers ability to accurately forecast demand and production.

6

Walmart Walmart distribution center WAREHOUSE

ALERT! NEED PAMPERS!

STORE ALERT! NEED PAMPERS!

RESUPPLY RESUPPLY

SHELF ALERT! NEED PAMPERS!

RESUPPLY

P&G regional supply manager

P&G suppliers

Source: As seen in Business 2.0 Copyright © 2002, Xplane Corp. Used with permission.

675

ste24102_ch15_648-687.indd 675ste24102_ch15_648-687.indd 675 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

676 Chapter Fifteen Supply Chain Management

The potential benefits for supply chain management are huge, and widespread adoption of RFID technology by retailers and manufacturers is predicted. In order to take advantage of RFID technology, businesses must first assess the capabilities of their existing informa- tion systems, then identify where RFID can have the greatest impact, estimate the time and resources that will be needed to implement the new system, estimate the risks and rewards of early versus late adoption, and then decide the best course of action. Important concerns at the retail level relate to privacy concerns if tags are not deactivated after items have been pur- chased and placement of tags so they do not hide important customer information on products.

The following reading provides an explanation of how an RFID system would work.

So higher value “things” at the pallet level and above often require active tags. Considering the total cost of ownership, an active tag’s higher cost is offset by a lower cost reader and processor infrastructure making the cost justification easier. Containers, trucks, and trailers are the best examples of high value items that require active tags.

In summary, passive and active RFID capabilities are related, but they are distinctly different technologies which should be matched to the application’s technical and economic requirements. Auto- matically identifying personnel, assets, and vehicles are “active” applications and the cornerstones of automated visibility, security, and quality improvements in the enterprise. In the supply chain, for example, total visibility, security and quality can only be attained by utilizing both.

Source: Excerpted from: www.rfidsb.com/index.php?page � rfidsb&c_ID � 156 . Copyright © 2008 Axcess International, Inc. Used with permission.

Allan Griebenow RFID tag technology falls into two broad categories—passive or active. Active RFID has an on-board power supply (e.g., a battery) while pas- sive relies on capturing and “re-using” a small portion of the wake-up signal’s energy to transmit its RFID tag I.D. back to the receiver. This is a “good news, bad news” situation. The “good news” is that passive tags can be manufactured and sold at a much lower price point today than active tags. This is a critical element in many RFID supply chain applications requiring the tagging of millions of units. The “bad news” is that passive tags often struggle to provide reliable reads given the performance limitations of a technology using only a small amount of power to push its signal off metal surfaces, through layers of pallet- ized products, etc. Also, passive tags sometimes struggle to provide a highly reliable signal when supply chain goods are in motion. Active tags therefore have an innate performance advantage over passive tags when it comes to providing a consistently robust, penetrating signal.

READING Active RFID vs. Passive RFID

Evaluating Shipping Alternatives Evaluation of shipping alternatives is an important component of supply chain management. Considerations include not only shipping costs, but also coordination of shipments with other supply chain activities, flexibility, speed, and environmental issues. Shipping options can involve trains, trucks, planes, and boats. Relevant factors include cost, time, availability, materials being shipped, and sometimes environmental considerations. At times options may be limited due to one or more of these factors. For example, heavy materials such as coal and iron ore would not be shipped by plane. High costs in some cases may rule out certain options. Also, time–cost trade-offs can be important. Organizations using a low-cost strategy often opt for slower, lower cost options, whereas organizations using a responsive strategy more often opt for quicker, higher cost options.

A situation that often arises in some businesses is the need to make a choice between rapid (but more expensive) shipping alternatives such as overnight or second-day air and slower (but less expensive) alternatives. In some instances, an overriding factor justifies sending a shipment by the quickest means possible, so there is little or no choice involved. However, in other instances, urgency is not the primary consideration, so there is a choice. The decision in such cases often focuses on the cost savings of slower alternatives versus the incremen- tal holding cost (here, the annual dollar amount that could be earned by the revenue from the item being shipped) that would result from using the slower alternative. An important assumption is that the seller gets paid upon receipt of the goods by the buyer (e.g., through electronic data interchange).

ste24102_ch15_648-687.indd 676ste24102_ch15_648-687.indd 676 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 677

The incremental holding cost incurred by using the slower alternative is computed as

Incremental holding cost ( )

365

H d � (15–1)

where

H   �  Annual earning potential of shipped item

d �  Difference (in days) between shipping alternatives

Determine which shipping alternative, one day or three days, is best when the holding cost of an item is $1,000 per year, the one-day shipping cost is $40, and the three-day shipping cost is

a. $35

b. $30

E X A M P L E 1

S O L U T I O N H   �  $1,000 per year Time savings  �  2 days using 1-day shipping Holding cost for additional 2 days  �  $1,000  �  (2/365)  �  $5.48

a. Cost savings  �  $5. Because the actual savings of $5 is less than the holding cost ($5.48), use the one-day alternative.

b. Cost savings  �  $10. Because the actual savings of $10 exceeds the savings in holding cost of $5.48, use the three-day alternative.

3-PL Third-party logistics (3-PL) is the term used to describe the outsourcing of logistics management. This might involve part or even all of the logistics function. For example, some companies use third-party providers just for shipping, others include warehousing and distribution, and still others rely on third-party companies to manage most or all of their supply chains. Companies are turning over warehousing and distribution to companies that specialize in these areas. Among the potential benefits of this are taking advantage of specialists’ knowledge, their well-developed information system, and their ability to obtain more favorable shipping rates, and enabling the company to focus more on its core business.

Third-party logistics (3-PL)  The outsourcing of logistics management.

ARC and SCTN conducted a survey of man- ufacturers and retailers to better understand their perspective of this emerging trend.

“Since software is generally coupled with specific business pro- cesses, it’s not surprising that companies are  .  .  . expecting 3PLs to provide a certain level of IT sophistication,” explains ARC analyst Adrian Gonzalez, author of the report. “Hence, technology is becoming a com- petitive differentiator for 3PLs, especially for small and midsize players that want to level the playing field with ‘the big boys.’ Technology also enables 3PLs to scale their operations without incurring additional over- head, assets and other costs. Simply stated, it allows them to do more with less.”

Over 40 percent of companies plan to outsource more software from third-party logistics providers (3PLs) over the next five years, according to “Beyond Software: Maximizing Value Via Outsourcing,” a new strate- gic report developed by ARC Advisory Group and SUPPLY CHAIN TECH- NOLOGY NEWS. Outsourcing is becoming the preferred choice for many companies, as evidenced by the strong growth of 3PLs and the increas- ing number of solution vendors that are offering hosted solutions.

Major companies such as Ford Motor, Procter & Gamble, General Mills, DuPont and CVS are all outsourcing various logistics-related tasks from transportation management to global trade management to fleet man- agement. In the case of Ford, for instance, the automaker uses a 3PL to manage its import and export trade processes throughout North America.

READING Rise of the 3PL

Continued

ste24102_ch15_648-687.indd 677ste24102_ch15_648-687.indd 677 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

678 Chapter Fifteen Supply Chain Management

15.14 CREATING AN EFFECTIVE SUPPLY CHAIN Creating an effective supply chain requires a thorough analysis of all aspects of the supply chain. Strategic sourcing is a term that is sometimes used to describe the process. Strategic sourcing is a systematic process for analyzing the purchase of products and services to reduce costs by reducing waste and non-value-added activities, increase profits, reduce risks, and improve supplier performance. Strategic sourcing differs from more traditional sourcing in that it emphasizes total cost rather than purchase price. Total cost includes storage costs, repair costs, disposal costs, and sustainability costs in addition to purchase price. It also seeks to consolidate purchasing power to achieve lower prices, relies on fewer suppliers and collab- orative relationships, works to eliminate redundancies, and employs cross-functional teams to help overcome traditional organizational barriers.

Strategic sourcing looks at current procurement in terms of what is bought, where and from what suppliers it is bought, and what other sources of supply are available; a sourcing strategy then is designed to minimize a combination of costs and risks. The goal is to have a cooperative relationship among supply chain partners that will facilitate planning and coor- dination of activities. It is essential for major trading partners to trust each other and to feel confident that partners share similar goals and will take actions that are mutually beneficial. The process is repeated periodically. A system for tracking results and making changes when needed is also established.

The SCOR ® (Supply Chain Operations Reference) model (www.supply-chain/SCOR) provides steps that can be used to create an effective supply chain:

1. Plan. Develop a strategy for managing all the resources that go into meeting expected customer demand for a product or service, including a set of metrics to monitor the supply chain.

2. Source. Select suppliers that will provide the goods and services needed to create products or support services. Also, develop a system for delivery, receiving, and verifying shipments or services. Structure payment along with metrics for monitoring and, if necessary, improving relationships.

3. Make. Design the processes necessary for providing services or producing, testing, and packaging goods. Monitor quality, service levels or production output, and worker productivity.

4. Deliver. Establish systems for coordinating receipt of shipments from vendors; develop a network of warehouses; select carriers to transport goods to customers; set up an invoicing system to receive payments; and devise a communication system for two-way flow of information among supply chain partners.

5. Manage returns. Create a responsive and flexible network for receiving defective and excess products from customers.

Achieving an effective supply chain requires integration of all aspects of the supply chain. Three important aspects of this are effective communication, the speed with which informa- tion moves through the supply chain, and having performance metrics.

Strategic sourcing  Analyzing the procurement process to lower costs by reducing waste and non- value-added activities, increase profits, reduce risks, and improve supplier performance.

• If a company decides to outsource just the technology, a software vendor is preferred over a 3PL.

Questions 1. Why do you think that large companies are more inclined to out-

source than smaller ones? 2. How important is technology in the 3PL decision? Why do you think this is?

Source: Excerpted from “The Rise of the 3PL,” www.totalmedia.com .

Key findings of the report indicate that:

• Large companies are more inclined to outsource than smaller ones, but both want to maintain some level of control, particularly for solu- tions/business process that directly impact customer and supplier relationships.

• When companies decide to outsource, they generally prefer to bun- dle the technology with managed services, primarily from a 3PL (as opposed to a software vendor).

ste24102_ch15_648-687.indd 678ste24102_ch15_648-687.indd 678 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 679

Effective communication. Effective supply chain communication requires integrated technology and standardized ways and means of communicating among partners.

Information velocity. Information velocity is important; the faster information flows (two-way), the better.

Performance metrics. Performance metrics are necessary to confirm that the supply chain is functioning as expected, or that there are problems that must be addressed. There are a variety of measures that can be used, which relate to such things as late deliveries, inventory turnover, response time, quality issues, and so on. In the retail sector, the fill rate (the percentage of demand filled from stock on hand) is often very important.

Table 15.7 lists some other key performance measures.

Managing Returns Products are returned to companies or third-party handlers for a variety of reasons, and in a variety of conditions. Among them are the following:

• Defective products.

• Recalled products.

• Obsolete products.

Information velocity  The speed at which information is communicated in a supply chain.

Fill rate  The percentage of demand filled from stock on hand.

LO15.13 Discuss the issues involved in managing returns.

Financial Operations Order fulfillment Return on assets Productivity Order accuracy Cost Quality Time to fill orders Cash flow Percentage of incomplete orders shipped Profits Percentage of orders delivered on time

Suppliers Inventory Customers Quality Average value Customer satisfaction On-time delivery Turnover Percentage of customer complaints Cooperation Weeks of supply Flexibility

TABLE 15.7 Supply chain performance measures

The term “clicks-or-bricks” refers to a business model in which a com- pany has either an online (clicks) or an offline (bricks) presence. Many companies have both. Sometimes that business model is referred to as “clicks-and-mortar” or “clicks-and-bricks.” In one version, a chain store may allow a customer to order goods online and pick them up at a local store. In another version, large items such as appliances or furniture may be viewed at a local store and then ordered electronically for home delivery. In both instances, the “bricks” portion necessitates a location decision.

Even companies that are seemingly pure “clicks,” selling elec- tronic products such as computers, still have warehousing and delivery facilities behind businesses that trade in material goods. Again, location decisions are necessary.

The choice of which business model to use requires taking into account the costs of having a physical presence and what the balance between the two should be. Of course, customer preferences and shop- ping patterns are important. For example, some reasons people shop

online include ease of price comparison, con- venience, availability of hard-to-find items, research recommendations, and elimination of the need to travel. Reasons for offline shopping include immediate pos- session of an item, ease of returns, the security risks of online shopping, the need to use a credit card, the burden of logistics for returns, and ability to “kick the tires” (e.g., try on clothing or footwear, judge quality).

Questions 1. Retail outlets that do not have an Internet presence often complain

that consumers come in to “kick the tires” but then buy online from a competitor. Can you suggest some ways outlets can overcome that?

2. Some customers of Internet businesses can avoid paying state sales taxes on purchases if the Internet businesses don’t have a physical presence in their state. However, more states are enacting laws to collect taxes. What impact might this have on the clicks, bricks, or both choices?

READINGClicks or Bricks, or Both?

ste24102_ch15_648-687.indd 679ste24102_ch15_648-687.indd 679 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

680 Chapter Fifteen Supply Chain Management

• Unsold products returned from retailers.

• Parts replaced in the field.

• Items for recycling.

• Waste.

The importance of returns is underscored by the fact that in the United States, the annual value of returns is estimated to be in the neighborhood of $100 billion. In the past, most items—except unsold products—were typically discarded. More recently, companies are rec- ognizing that substantial value can be reclaimed from returned items. For example, defective parts can be repaired or replaced, and products can be resold as reconditioned. Obsolete prod- ucts may have usable parts or subassemblies, or they may have value in other markets. Parts replaced in the field may in fact not be defective at all; it is estimated that about a third of such parts are not defective and may be reusable as “reconditioned” replacement parts. Recyclable items can be sold to recyclers and might be usable for energy production; other waste and unusable products and parts might require disposal according to sometimes stringent guide- lines. For example, governments, particularly in Europe, are increasingly enacting legislation making original manufacturers responsible for acquiring and disposing of their products at the end of their products’ useful lives.

To make a determination as to the appropriate disposition of returned items, the items must be sorted, inspected, or tested and directed to the appropriate destination for repair and reuse, recycling, or disposal. Often, transportation is required. Reverse logistics is the process of physically transporting returned items. This involves either retrieving items from the field or moving items from the point of return to a facility where they will be inspected and sorted and then transporting to their final destination.

Two key elements of managing returns are gatekeeping and avoidance. Gatekeeping oversees the acceptance of returned goods with the intent of reducing the cost of returns by screening returns at the point of entry into the system and refusing to accept goods that should not be returned or goods that are returned to the wrong destination. Effective gatekeeping enables organizations to control the rate of returns without negatively impacting customer ser- vice. Avoidance refers to finding ways to minimize the number of items that are returned. It can involve product design and quality assurance. It may also involve monitoring forecasts during promotional programs to avoid overestimating demand to minimize returns of unsold product.

Reverse logistics  The process of transporting returned items.

Gatekeeping  Screening returned goods to prevent incorrect acceptance of goods.

Avoidance  Finding ways to minimize the number of items that are returned.

An Amazon.com employee inspects returned products at a distribution warehouse in Nevada. The returned goods are inspected for restocking if in pristine condition, forwarded to a repair center if necessary, inventoried, and examined for potential product, process, or packaging improvements if they are defective.

ste24102_ch15_648-687.indd 680ste24102_ch15_648-687.indd 680 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 681

The condition of returned products as well as the timing of returns may vary, making it difficult to plan for the reverse flow. On the other hand, returns can provide valuable infor- mation, such as how and why failures occurred, which can improve product quality and/or product design and minimize future returns for that reason. They can also help identify some sources of customer dissatisfaction, which can have design benefits.

It is likely that the importance of this aspect of supply chain management will grow due to shortened product life cycles, increasing returns from increasing Internet commerce sales from dissatisfied customers, replacement of consumer electronics that are in working order as newer models become available, pressures on manufacturers to reduce costs, and increasing con- sumer and government environmental concerns. The term closed-loop supply chain is used to describe a situation where a manufacturer controls both the forward and reverse logistics.

Challenges The often dynamic supply chain environment and the complexity of supply chains can make managing them very challenging.

Barriers to Integration of Separate Organizations. Organizations, and their func- tional areas, have traditionally had an inward focus. They set up buffers between themselves and their suppliers. Changing that attitude can be difficult. The objective of supply chain management is to be efficient across the entire supply chain.

One difficulty in achieving this objective is that different components of the supply chain often have conflicting objectives. For example, to reduce their inventory holding costs, some companies opt for frequent small deliveries of supplies. This can result in increased holding costs for suppliers, so the cost is merely transferred to suppliers. Similarly, within an orga- nization, functional areas often make decisions with a narrow focus, doing things that “opti- mize” results under their control; in so doing, however, they may suboptimize results for the overall organization. To be effective, organizations must adopt a systems approach to both the internal and external portions of their supply chains, being careful to make decisions that are consistent with optimizing the supply chain.

Another difficulty is that for supply chain management to be successful, organizations in the chain must allow other organizations access to their data. There is a natural reluctance to do this in many cases. One reason can be lack of trust; another can be unwillingness to share proprietary information in general; and another can be that an organization, as a member of multiple chains, fears exposure of proprietary information to competitors.

Getting CEOs, Boards of Directors, Managers, and Employees “Onboard.” CEOs and boards of directors need to be convinced of the potential payoffs from supply chain man- agement. And because much of supply chain management involves a change in the way busi- ness has been practiced for an extended period of time, getting managers and workers to adopt new attitudes and practices that are consistent with effective supply chain operations poses a real challenge.

Dealing with Trade-offs. Authors Hau Lee and C. Billington list a number of trade-offs that must be taken into account in structuring a supply chain: 5

1. Lot size–inventory trade-off. Producing or ordering large lot sizes yields benefits in terms of quantity discounts and lower annual setup costs, but it increases the amount of safety stock carried by suppliers and, hence, the carrying cost. It also can create the bullwhip effect.

It is caused by the way inventories are replenished at various points along a supply chain. For a variety of reasons, organizations tend to periodically order batches of an item from their suppliers. This creates “lumpy” demand for suppliers and, hence, high-variability demand,

Closed-loop supply chain   A manufacturer controls both the forward and reverse shipment of product.

LO15.14 Describe some of the challenges in creating an effec- tive supply chain and some of the trade-offs involved.

5 Excerpted from Hau Lee and C. Billington, “Managing Supply Chain Inventory,” Sloan Management Review, Spring 1992, pp. 65–68, by permission of publisher. Copyright © 1992 by Sloan Management Review. All rights reserved.

ste24102_ch15_648-687.indd 681ste24102_ch15_648-687.indd 681 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

682 Chapter Fifteen Supply Chain Management

which causes suppliers to carry relatively large amounts of safety stock. Starting with the final customer and moving backward through the supply chain, batch sizes tend to increase, thereby increasing the level of safety stock carried. What is so striking about this phenomenon is that any demand variations that exist at the customer end of the supply chain get magnified as orders are generated back through the supply chain.

2. Inventory–transportation cost trade-off. Suppliers prefer to ship full truckloads instead of partial loads in order to spread shipping costs over as many units as possible. This leads to higher holding costs for customers. Solutions include combining orders to realize full truckloads, downsizing truck capacity, and shipping late in the process along with cross-docking. Cross-docking is a technique whereby goods arriving at a ware- house from a supplier are unloaded from the supplier’s truck and immediately loaded on one or more outbound trucks, thereby avoiding storage at the warehouse completely. Walmart is among the companies that have used this technique successfully to reduce inventory holding costs and lead times.

3. Lead time–transportation cost trade-off. Suppliers usually prefer to ship in full loads, as mentioned previously. But waiting for sufficient orders and/or production to achieve a full load increases lead time. In addition to the preceding suggestions, improved forecasting information to suppliers might improve the timing of their production and orders to their suppliers.

4. Product variety–inventory trade-off. Higher product variety generally means smaller lot sizes, which results in higher setup costs, as well as higher transportation and inventory management costs. One possible means of reducing some costs is delayed differentiation , which means producing standard components and subassemblies, then waiting until late in the process to add differentiating features. For example, an automobile producer may produce and ship cars without radios, allowing customers to select from a range of radios that can be installed by the dealer, thereby eliminating that variety from much of the supply chain. Other examples include delaying adding labels, postponing packaging, and delaying mixing or additives.

5. Cost–customer service trade-off. Producing and shipping in large lots reduces costs, but it increases lead times, as previously noted. One approach to reducing lead time is to ship directly from a warehouse to the customer, bypassing a retail outlet. Reducing one or more steps in a supply chain by cutting out one or more intermediaries is referred to as disintermediation . Although transportation costs are higher, storage costs are lower.

Cross-docking  A technique whereby goods arriving at a warehouse from a supplier are unloaded from the supplier’s truck and loaded onto outbound trucks, thereby avoiding ware- house storage.

Delayed differentiation   Production of standard components and subassemblies, which are held until late in the process to add differentiating features.

Disintermediation  Reducing one or more steps in a supply chain by cutting out one or more intermediaries.

TABLE 15.8 Benefits and possible drawbacks of potential improvements to a supply chain

Problem Potential Improvement Benefits

Possible Drawbacks

Large inventories Smaller, more frequent deliveries, cross- docking

Reduced holdings costs Traffic congestion, increased ordering costs, increased supplier costs

Long lead times Delayed differentiation Disintermediation

Quick response Quick response

May not be feasible May need to absorb

functions Large number of

parts Modular construction Fewer parts to keep track of,

simpler ordering Less variety

Cost, quality Outsourcing Reduced cost, higher quality, fewer internal problems, remaining operations more focused

Loss of control

Variability Shorter lead times, better forecasts, reduction in product/ service variety

Better able to match supply and demand

Less variety

ste24102_ch15_648-687.indd 682ste24102_ch15_648-687.indd 682 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 683

Small Businesses. Small businesses may be reluctant to embrace supply chain management because it can involve specialized, complicated software as well as sharing sensitive informa- tion with outside companies. Nonetheless, in order for them to survive, they may have to do so.

Variability and Uncertainty. Variations create uncertainty, thereby causing inefficiencies in a supply chain. Variations occur in incoming shipments from suppliers, internal operations, deliveries of products or services to customers, and customer demands. Increases in product and service variety add to uncertainty, because organizations have to deal with a broader range and frequent changes in operations. Hence, when deciding to increase variety, organiza- tions should consider this trade-off.

Although variations exist throughout most supply chains, decision makers often treat the uncertainties as if they were certainties and make decisions on that basis. In fact, systems are often designed on the basis of certainty, so they may not be able to cope with uncertainty. Unfor- tunately, uncertainties are detrimental to effective management of supply chains because they result in various undesirable occurrences, such as inventory buildups, bottleneck delays, missed delivery dates, and frustration for employees and customers at all stages of a supply chain.

Response Time. Response time is an important issue in supply chain management. Long lead times impair the ability of a supply chain to quickly respond to changing conditions, such as changes in the quantity or timing of demand, changes in product or service design, and quality or logistics problems. Therefore, it is important to work to reduce long product lead times and long collaborative lead times, and a plan should be in place to deal with problems when they arise.

Table 15.8 lists some potential solutions to supply chain problems and possible drawbacks.

15.15 STRATEGY Effective supply chains are critical to the success of business organizations. Development of supply chains should be accorded strategic importance. Achieving an effective supply chain requires integration of all aspects of the chain. Supplier relationships are a critical component of supply chain management. Collaboration and joint planning and coordination are keys to supply chain success. In that regard, a systems view of the supply chain is essential.

Many businesses are employing principles of lean operations and six sigma methodology to improve supply chain performance. However, lean supply chains can increase supply chain risk and may necessitate increased inventories to offset those risks.

A supply chain consists of all of the organizations, facilities, functions, and activities involved in pro- ducing a product or providing a service. The chapter provides a list of strategic, tactical, and operational responsibilities related to supply chain management. The chapter covers key issues, recent trends, pro- curement, ethical behavior, e-business, supplier management, inventory management, returns manage- ment, and risk management.

The basic components of supply chain management are strategy formulation, procurement, supply management, demand management, and logistics management. The key issues in supply chain manage- ment relate to determining the appropriate level of outsourcing, managing procurement, managing sup- pliers, managing customer relationships, being able to quickly identify problems and respond to them, and managing risk.

The goal of supply chain management is to match supply and demand as effectively and efficiently as possible. Because supply chains are made up of multiple organizations, cooperation and collaboration among supply chain partners is very important. Supply chain functioning benefits from mutual trust, information sharing, and collaborative forecasting and planning.

Recent trends in supply chain management relate to managing risk, reevaluating outsourcing, man- aging inventories, and applying lean principles to improve supply chain performance.

SUMMARY

ste24102_ch15_648-687.indd 683ste24102_ch15_648-687.indd 683 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

684 Chapter Fifteen Supply Chain Management

1. What trade-offs are involved in ( a ) sharing information with other organizations in a supply chain and ( b ) the acquisition of information-processing technology?

2. Who needs to be involved in ( a ) decisions on technology acquisition for supply chain management and ( b ) supply chain management?

3. Name three different ways that technology has improved the ability to manage supply chains.

TAKING STOCK

1. Supply chains are a vital part of every business organization and need to be managed effectively to achieve a balance of supply and demand.

2. Among important trends in supply chain management are measuring ROI, “greening” the supply chain, reevaluating outsourcing, integrating IT, managing risks, and adopting lean principles.

3. It is important for businesses to encourage their supply chain partners to act ethically.

4. Effective supply chains involve trust, communication, a rapid, two-way flow of information, vis- ibility, and event-response capability.

KEY POINTS

avoidance, 680 bullwhip effect, 670 centralized purchasing, 662 closed-loop supply chain, 681 cross-docking, 682 decentralized purchasing, 662 delayed differentiation, 682 disintermediation, 682 e-business, 663 event-response capability, 655 fill rate, 679

gatekeeping, 680 information velocity, 679 inventory velocity, 670 logistics, 650, 672 order fulfillment, 671 purchasing cycle, 661 reverse logistics, 680 radio frequency identification (RFID), 674 resiliency, 655 strategic partnering, 669

strategic sourcing, 678 supply chain, 649 supply chain management, 650 supply chain visibility, 655 third-party logistics (3-PL), 677 traffic management, 674 vendor analysis, 667 vendor-managed inventory (VMI), 670

KEY TERMS

1. What is a supply chain?

2. What are some recent trends in supply chain management?

3. What are the elements of supply chain management?

4. What are the strategic, tactical, and operations responsibilities in supply chain management?

5. What is the bullwhip effect, and why does it occur? How can it be overcome?

6. Explain the increasing importance of the procurement function.

7. What is meant by the term inventory velocity and why is this important? What is information velocity, and why is it important?

8. Explain strategic partnering.

9. What impact has e-business had on supply chain management?

10. What are some of the advantages of e-business?

11. What are some of the trade-offs that might be factors in designing a supply chain?

12. Why is managing returns important?

13. Explain the importance of supply chain visibility.

14. Describe what purchasing managers do.

15. Describe how purchasing interacts with two other functional areas of an organization.

16. Discuss the importance of RFID for supply chain management.

17. Discuss centralization versus decentralization in purchasing. What are the advantages of each?

18. Describe vendor analysis.

19. Describe supplier certification and explain why it can be important.

20. Compare viewing suppliers as adversaries with viewing them as partners.

21. Explain the benefit of cross-docking.

DISCUSSION AND REVIEW QUESTIONS

ste24102_ch15_648-687.indd 684ste24102_ch15_648-687.indd 684 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 685

1. Explain why each of these is critical for a successful supply chain operation:

a. Integrated technology b. Information sharing c. Trust among trading partners d. Real-time information availability e. Event-response capability f. Procurement g. Risk management

2. Given the complexities and risks involved with supply chains, might it make sense for a business organization to vertically integrate and be its own supply chain?

3. From a systems viewpoint, what are some of the environmental issues involved in a decision by a company to outsource manufacturing operations to a foreign country?

4. Select three of the examples of unethical behavior on p. 657, other than those that violate basic human rights, and indicate which principle in Table 15.2 would be violated.

CRITICAL THINKING

EXERCISES

1. A manager at Strateline Manufacturing must choose between two shipping alternatives: two- day freight and five-day freight. Using five-day freight would cost $135 less than using two-day freight. The primary consideration is holding cost, which is $10 per unit a year. Two thousand items are to be shipped. Which alternative would you recommend? Explain.

2. Determine which shipping alternative would be most economical to ship 80 boxes of parts when each box has a price of $200 and holding costs are 30 percent of price, given this shipping infor- mation: overnight, $300, two-day, $260, six-day, $180.

3. A manager must make a decision on shipping. There are two shippers, A and B. Both offer a two- day rate: A for $500 and B for $525. In addition, A offers a three-day rate of $460 and a nine-day rate of $400, and B offers a four-day rate of $450 and a seven-day rate of $410. Annual holding costs are 35 percent of unit price. Three hundred boxes are to be shipped, and each box has a price of $140. Which shipping alternative would you recommend? Explain.

PROBLEMS

Nicole Foster , Grand Valley State University When MasterTag was founded in 1949, its founder, Ludwig Schmidt, set out to be a manufacturer of plastic fishing bobbers. Then, in 1950, Mr. Schmidt was approached by a local greenhouse owner and was asked if he could produce a line of horticultural labels for plants. At the time, these labels were made of wood. Mr. Schmidt adapted his machines to produce these labels and has been manufacturing the plastic “tags” for plants ever since. Over the years, the labels have increased in quality and now feature full-color pictures of the plants along with the name and planting and care instructions.

Many of MasterTag’s largest customers are seed companies that sell the seeds to commercial growers. The large seed companies typi- cally place one or two large orders with MasterTag at the beginning of the growing season. The seed companies then sell their seeds and the labels to their customers who grow the plants and sell them to the end consumer. For various reasons, the seed companies do not like ordering tags, but do so because their customers demand labels with their seeds.

However, there are several problems with this ordering process. The main issue stems from the fact that the exact quantities of tags

that will be needed is difficult to predict due to possible crop failures and the introduction of new items. To avoid a shortage of tags, seed companies order and ship a large quantity of tags to their customers. Tags are ordered early to allow for the time needed to incorporate the tags with the seeds. Seed companies usually end up each year with huge numbers of leftover tags. In fact, MasterTag’s largest customers often end up with millions of leftover tags.

When MasterTag’s management became aware of all the unused labels and unhappy customers, they decided they must come up with a better solution for achieving a match between supply and demand of the tags. One possible solution would be to make an initial, fairly large batch, which would be produced and shipped directly to the growers instead of the seed companies, as is now being done. Later, when the grower results became available, a second batch would be produced using information from growers on how many additional tags are needed. The second batch would then be made and shipped to the growers. (See figure for Before and After.)

CASE MasterTag

Continued

ste24102_ch15_648-687.indd 685ste24102_ch15_648-687.indd 685 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

686 Chapter Fifteen Supply Chain Management

Brian Wilson, materials manager at B&L Inc. in Lancaster, Pennsylvania, was considering a proposal from his purchasing agent to outsource manufacturing for an outrigger bracket. It was the end of April and Mr. Wilson had to evaluate the proposal and make a decision regarding whether to proceed.

B&L Inc. Background B&L Inc. manufactured trailers for highway transport trucks. The com- pany comprised three divisions: the Trailer, Sandblast & Paint, and Metal Fabricating Divisions. Each division operated as a separate profit center, but manufacturing operations between each were highly integrated.

The Metal Fabricating Division produced most of the component parts of the trailers, the Trailer Divi- sion performed the assembly operations, and the Sandblast & Paint Division was responsible for completing the sandblasting and final painting operation. B&L manufactured approximately 40 trailers per year, with about two-thirds produced during the period from November to April.

The Outrigger Bracket The outrigger bracket, part number T-178, was an accessory that could be used to secure oversized containers. The bracket consisted of four

CASE B&L Inc.

Continued

Questions

1. Explain the key benefit of the revised approach, and the reason for the benefit.

2. MasterTag has not yet decided to implement this plan. List the pros and cons you think should be considered.

AfterBefore

MasterTag sends tags to seed companies.

Seed companies send plants without tags to growers.

Seed companies send plants and tags to growers.

MasterTag sends a large batch of tags to growers.

Growers receive plants from seed companies and tags from MasterTag.

Growers receive plants and tags from seed companies.

MasterTag sends additional tags to growers as needed.

Growers receive additional tags from MasterTag.

Plants with tags are shipped to retailers.

Plants with tags are shipped to retailers.

End customers buy plants with tags.

End customers buy plants with tags.

ste24102_ch15_648-687.indd 686ste24102_ch15_648-687.indd 686 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

Chapter Fifteen Supply Chain Management 687

Benton, W. C. Purchasing and Supply Chain Manage- ment. 2nd ed. New York: McGraw-Hill, 2010.

Blanchard, David. Supply Chain Management: Best Practices. 2nd ed. New York: Wiley, 2011.

Bowersox, Donald J., David J. Closs, and M. Bixby Cooper. Supply Chain Logistics Management. 3rd ed. New York: Irwin/McGraw-Hill, 2010.

Chopra, Sunil, and Peter Meidl. Supply Chain Management: Strategy, Planning, and Operation. 5th ed. New York: Pearson, 2012.

Guide, V. Daniel R., Jr., and Luk N. Van Wassenhove. “The Reverse Supply Chain.” Harvard Business Review 80, (2), pp. 25–26, 2002.

Handfield, Robert B., and Ernest L. Nichols Jr. Introduction to Supply Chain Management. Upper Saddle River, NJ: Prentice Hall, 1999.

Johnson, P. Fraser, Michiel R. Leenders, and Anna E. Flynn. Purchasing and Supply Management. 14th ed. New York: McGrawHill/Irwin, 2011.

Lee, Hau L. “The Triple-A Supply Chain.” Harvard Business Review, October 2004.

Monczka, Robert M., Robert H. Handfield, Larry Guinipero, and James Patterson. Purchasing and Supply Chain Management. 5th ed. Stamford, CT: South-Western - Cengage Learning, 2011.

RFID Journal.com

Simchi-Levi, David, Philip Kaminsky, and Edith Simchi-Levi. Designing and Managing the Supply Chain: Concepts, Strategies, and Case Studies. New York: Irwin/McGraw-Hill, 2000.

Webster, Scott. Principles and Tools for Supply Chain Management. New York: McGraw-Hill, 2008.

SELECTED BIBLIOGRAPHY AND FURTHER

READINGS

component parts welded together, and each trailer sold by B&L had 20 brackets—10 per side.

The Metal Fabricating Division was currently manufacturing the out- rigger bracket. The subassembly parts—T-67, T-75, T-69, and T-77— were processed on a burn table, which cut the raw material to size. Although the burn table could work with eight stations, this machine had only been operating with one station. The final assembly operation, T-70, was performed at a manual welding station.

Manufacturing lead time for the outrigger bracket was two weeks. However, the Metal Fabricating Division had been able to coordinate supply and production with assembly operations. Consequently, finished inventory levels of the outrigger bracket were kept to a minimum. B&L’s inventory holding costs were 20 percent per annum.

The Outsourcing Decision In an effort to reduce costs, the purchasing agent, Alison Beals, who reported to Brian Wilson, solicited quotes from three local companies to supply the outrigger bracket. Mayes Steel Fabricators (Mayes), a current supplier to B&L for other components, offered the lowest bid, with a cost of $108.20, FOB B&L.

Brian met with the controller, Mike Carr, who provided a breakdown of the manufacturing costs for the outrigger bracket. Looking at the spreadsheet, Mike commented: “These are based on estimates of our costs from this year’s budget. Looking at the material, labor, and over- head costs, I would estimate that the fixed costs for this part are in the area of about 20 percent. Keep in mind that it costs us about $75 to place an order with our vendors.” Exhibit 1 provides B&L’s internal cost breakdown and details from the quote from Mayes.

Brian expected that B&L would have to arrange for extra storage space if he decided to outsource the outrigger bracket to Mayes, who had quoted delivery lead time of four weeks. Because Mayes was local and had a good track record, Brian didn’t expect the need to carry much safety stock, but the order quantity issue still needed to be resolved.

B&L was operating in a competitive environment and Brian had been asked by the division general manager to look for opportunities to reduce costs. As he sat down to review the information, Brian knew that he should make a decision quickly if it was possible to cut costs by outsourcing the outrigger bracket.

Analyze the information and make a recommendation.

Source: Johnson, P. Fraser, Michiel R. Leenders, and Anna E. Flynn. Purchasing and Supply Management, 14th ed. New York: McGrawHill/Irwin, 2011, pp. 131–7.

Parts Mayes Steel Fabricators

B&L Manufacturing Costs

T-67 $14.60 $17.92 T-75 21.10 17.92 T-69 18.50 45.20 T-77 13.00 10.37 T-70 41.00 58.69

Total $108.20 $150.10

EXHIBIT 1 Manufacturing Costs and Mayes Quote: Outrigger Bracket T-178

ste24102_ch15_648-687.indd 687ste24102_ch15_648-687.indd 687 11/14/13 10:40 AM11/14/13 10:40 AM

Final PDF to printer

688

C H A P T E R

16

After completing this chapter, you should be able to:

LO16.1 Explain what scheduling involves and the importance of good scheduling.

LO16.2 Compare product and service scheduling hierarchies.

LO16.3 Describe scheduling needs in high-volume systems.

LO16.4 Describe scheduling needs in intermediate-volume systems.

LO16.5 Describe scheduling needs in job shops.

LO16.6 Use and interpret Gantt charts.

LO16.7 Use the assignment method for loading.

LO16.8 Give examples of commonly used priority rules.

LO16.9 Discuss the theory of constraints and that approach to scheduling.

LO16.10 Summarize some of the unique problems encountered in service systems, and describe some of the approaches used for scheduling service systems.

Scheduling

CHAPTER OUTLINE

16.1 Scheduling Operations, 690 Scheduling in High-Volume Systems, 690

Scheduling in Intermediate-Volume Systems, 692

16.2 Scheduling in Low-Volume Systems, 693 Loading, 693

Sequencing, 700

Sequencing Jobs through Two Work Centers, 707

Sequencing Jobs When Setup Times Are Sequence-Dependent, 709

Why Scheduling Can Be Difficult, 709

Minimizing Scheduling Difficulties, 710

The Theory of Constraints, 710

16.3 Scheduling Services, 711 Appointment Systems, 712

Reservation Systems, 712

Yield Management, 712

Scheduling the Workforce, 714

Cyclical Scheduling, 714

Scheduling Multiple Resources, 715

16.4 Operations Strategy, 716

Case: Hi-Ho, Yo-Yo, Inc., 728

LEARNING OBJECTIVES

ste24102_ch16_688-729.indd 688ste24102_ch16_688-729.indd 688 11/19/13 2:05 PM11/19/13 2:05 PM

Final PDF to printer

689

Airline travel can be difficult when flights are delayed or canceled due to weather problems. And even though it may be clear and dry in some areas, flights in those places can still be affected by weather in other areas. Because of all the interdependencies, a problem in one area, especially around major hub airports like Chicago, Atlanta, and New York, has a cascading effect with impacts throughout the nation. This results in massive scheduling problems. Flight arrivals and departures have to be rescheduled, which then means flight crews, terminal gates, connections, and bag- gage and freight also must be rescheduled. Airline and air traffic control software scheduling systems include and optimize thousands of variables.

Within an organization, scheduling pertains to establishing the timing of the use of specific resources of that organization. It relates to the use of equipment, facilities, and human activi- ties. Scheduling occurs in every organization, regardless of the nature of its activities. For example, manufacturers must sched- ule production, which means developing schedules for workers, equipment, purchases, maintenance, and so on. Hospitals must schedule admissions, surgery, nursing assignments, and support services such as meal preparation, security, maintenance, and cleaning. Educational institutions must schedule classrooms, instruction, and students. And lawyers, doctors, dentists, hair- dressers, and auto repair shops must schedule appointments.

In the decision-making hierarchy, scheduling decisions are the final step in the transformation process before actual output occurs. Many decisions about system design and operation have been made long before scheduling decisions. They include the capacity of the system, product or service design, equipment selection, selection and training of workers, and aggregate planning and master scheduling. Consequently, scheduling decisions must be made within the constraints established by many other decisions, making them fairly narrow in scope and latitude. Figure  16.1 depicts scheduling hierarchies for manufacturing and service scheduling.

Effective scheduling can yield cost savings, increases in productivity, and other benefits. For example, in hospitals, effective scheduling can save lives and improve patient care. In educational institutions, it can reduce the need for expansion of facilities. In competitive environments, effective scheduling can give a company a competitive advantage in terms of customer service (shorter wait time for their orders) if its competitors are less effective with their scheduling.

Scheduling  Establishing the timing of the use of equipment, facilities, and human activities in an organization.

LO16.1 Explain what scheduling involves and the importance of good scheduling.

ste24102_ch16_688-729.indd 689ste24102_ch16_688-729.indd 689 11/19/13 2:05 PM11/19/13 2:05 PM

Final PDF to printer

690 Chapter Sixteen Scheduling

FIGURE 16.1 Scheduling hierarchies

Manufacturing Service

Aggregate Planning

Master Production Schedule Master Schedule

Material Requirements Planning Monthly or Weekly Schedule

Shop Floor Schedule Daily Schedule

Aggregate Planning

Generally, the objectives of scheduling are to achieve trade-offs among conflicting goals, which include efficient utilization of staff, equipment, and facilities, and minimization of customer waiting time, inventories, and process times.

This chapter covers scheduling in both manufacturing and service environments. Although the two environments have many similarities, some basic differences are important.

16.1 SCHEDULING OPERATIONS Scheduling tasks are largely a function of the volume of system output. High-volume sys- tems require approaches substantially different from those required by job shops, and project scheduling requires still different approaches. In this chapter, we will consider scheduling for high-volume systems, intermediate-volume systems, and low-volume (job shop) scheduling. Project scheduling is discussed in Chapter 17.

Scheduling in High-Volume Systems Scheduling encompasses allocating workloads to specific work centers and determining the sequence in which operations are to be performed. High-volume systems are characterized by standardized equipment and activities that provide identical or highly similar operations on customers or products as they pass through the system. The goal is to obtain a smooth rate of flow of goods or customers through the system in order to get a high utilization of labor and equipment. High-volume systems, where jobs follow the same sequence, are often referred to as flow systems ; scheduling in these systems is referred to as flow-shop scheduling , although flow-shop scheduling also can be used in medium-volume systems. Examples of high-volume products include autos, personal computers, radios and televisions, stereo equipment, toys, and appliances. In process industries, examples include petroleum refining, sugar refining, mining, waste treatment, and the manufacturing of fertilizers. Examples of services include cafeteria lines, news broadcasts, and mass inoculations. Because of the highly repetitive nature of these systems, many of the loading and sequence decisions are determined during the design of the system. The use of highly specialized tools and equipment, the arrangement of equipment, the use of specialized material-handling equipment, and the division of labor are all designed to enhance the flow of work through the system, since all items follow virtually the same sequence of operations.

LO16.2 Compare product and service scheduling hierarchies.

LO16.3 Describe scheduling needs in high-volume systems.

Flow system  High-volume system in which jobs all follow the same sequence.

Flow-shop scheduling   Scheduling for flow systems.

ste24102_ch16_688-729.indd 690ste24102_ch16_688-729.indd 690 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 691

A major aspect in the design of flow systems is line balancing, which concerns allocating the required tasks to workstations so that they satisfy technical (sequencing) constraints and are balanced with respect to equal work times among stations. Highly balanced systems result in the maximum utilization of equipment and personnel as well as the highest possible rate of out- put. Line balancing is discussed in Chapter 6.

In setting up flow systems, designers must consider the poten- tial discontent of workers in connec- tion with the specialization of job tasks in these systems; high work rates are often achieved by dividing the work into a series of relatively simple tasks assigned to different workers. The resulting jobs tend to be boring and monoto- nous and may give rise to fatigue, absenteeism, turnover, and other problems, all of which tend to reduce productivity and disrupt the smooth flow of work. These problems and poten- tial solutions are elaborated on in Chapter 7, which deals with the design of work systems.

In spite of the built-in attributes of flow systems related to scheduling, a number of sched- uling problems remain. One stems from the fact that few flow systems are completely devoted to a single product or service; most must handle a variety of sizes and models. Thus, an automobile manufacturer will assemble many different combinations of cars—two-door and four-door models, some with air-conditioning and some not, some with deluxe trim and oth- ers with standard trim, some with CD players, some with tinted glass, and so on. The same can be said for producers of appliances, electronic equipment, and toys. Each change involves slightly different inputs of parts, materials, and processing requirements that must be sched- uled into the line. If the line is to operate smoothly, a supervisor must coordinate the flow of materials and the work, which includes the inputs, the processing, and the outputs, as well as purchases. In addition to achieving a smooth flow, it is important to avoid excessive buildup of inventories. Again, each variation in size or model will tend to have somewhat different inventory requirements, so that additional scheduling efforts will be needed.

One source of scheduling concern is possible disruptions in the system that result in less than the desired output. These can be caused by equipment failures, material shortages, acci- dents, and absences. In practice, it is usually impossible to increase the rate of output to compensate for these factors, mainly because flow systems are designed to operate at a given rate. Instead, strategies involving subcontracting or overtime are often required, although sub- contracting on short notice is not always feasible. Sometimes work that is partly completed can be made up off the line.

The reverse situation can also impose scheduling problems although these are less severe. This happens when the desired output is less than the usual rate. However, instead of slowing the ensuing rate of output, it is usually necessary to operate the system at the usual rate, but for fewer hours. For instance, a production line might operate temporarily for seven hours a day instead of eight.

High-volume systems usually require automated or specialized equipment for processing and handling. Moreover, they perform best with a high, uniform output. Shutdowns and start- ups are generally costly, and especially costly in process industries. Consequently, the follow- ing factors often determine the success of such a system:

• Process and product design. Here, cost and manufacturability are important, as is achieving a smooth flow through the system.

At the Wakefield, U.K. factory, Rexam produces 5,000 cans per minute and delivers them to its main customer, Coca-Cola Bottling. To meet Coke’s lean manufacturing requirements, Rexam needed to spray cans the same every single time. They added a spray monitor system to immediately identify spray malfunctions. The early diagnostics of the spray monitor system can save Rexam from coating hundreds of cans improperly. The objectives in upgrading were to improve quality, reduce variation, and reduce costs.

ste24102_ch16_688-729.indd 691ste24102_ch16_688-729.indd 691 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

692 Chapter Sixteen Scheduling

• Preventive maintenance. Keeping equipment in good operating order can minimize breakdowns that would disrupt the flow of work.

• Rapid repair when breakdowns occur. This can require specialists as well as stocks of critical spare parts.

• Optimal product mixes. Techniques such as linear programming can be used to deter- mine optimal blends of inputs to achieve desired outputs at minimal costs. This is par- ticularly true in the manufacture of fertilizers, animal feeds, and diet foods.

• Minimization of quality problems. Quality problems can be extremely disruptive, requiring shutdowns while problems are resolved. Moreover, when output fails to meet quality standards, not only is there the loss of output but also a waste of the labor, mate- rial, time, and other resources that went into it.

• Reliability and timing of supplies. Shortages of supplies are an obvious source of dis- ruption and must be avoided. On the other hand, if the solution is to stockpile supplies, that can lead to high carrying costs. Shortening supply lead times, developing reliable supply schedules, and carefully projecting needs are all useful.

Scheduling in Intermediate-Volume Systems Intermediate-volume system outputs fall between the standardized type of output of the high-volume systems and made-to-order output of job shops. Like the high-volume systems, intermediate-volume systems typically produce standard outputs. If manufacturing is involved, the products may be for stock rather than for special order. However, the volume of output in such cases is not large enough to justify continuous production. Instead, it is more economical to process these items intermittently. Thus, intermediate-volume work centers periodically shift from one job to another. In contrast to a job shop, the run (batch) sizes are relatively large. Exam- ples of products made in these systems include canned foods, baked goods, paint, and cosmetics.

The three basic issues in these systems are the run size of jobs, the timing of jobs, and the sequence in which jobs should be processed.

Sometimes, the issue of run size can be determined by using a model such as the economic run size model discussed in Chapter 13 on inventory management. The run size that would minimize setup and inventory costs is

Q DS

H

p

p u S

2 , where Setup cost0 �

� � (16–1)

Setup cost may be an important consideration. Setup costs may depend on the order in which jobs are processed; similar jobs may require less setup change between them. For example, jobs in a print shop may be sequenced by ink color to reduce the number of setups needed. This opens up the possibility of reducing setup cost and time by taking processing sequence into account. It also makes sequencing more complex, and it requires estimating job setup costs for every sequence combination.

In another vein, companies are working to reduce setup times and, hence, experience less downtime for equipment changeover. Tactics include offline setups, snap-on parts, modular setups, and flexible equipment designed to handle a variety of processing requirements.

Another difficulty arises because usage is not always as smooth as assumed in the model. Some products will tend to be used up faster than expected and have to be replenished sooner. Also, because multiple products are to be processed, it is not always possible to schedule pro- duction to correspond with optimum run times.

Another approach frequently used is to base production on a master schedule developed from customer orders and forecasts of demand. Companies engaged in assembly operations would then use an MRP approach (described in Chapter 12) to determine the quantity and projected timing of jobs for components. The manager would then compare projected require- ments with projected capacity and develop a feasible schedule from that information. Compa- nies engaged in producing processed rather than assembled goods (e.g., food products, such

LO16.4 Describe scheduling needs in intermediate-volume systems.

ste24102_ch16_688-729.indd 692ste24102_ch16_688-729.indd 692 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 693

as canned goods and beverages; publishing, such as magazines; paints and cleaning supplies) would use a somewhat different approach; the time-phasing information provided by MRP would not be an important factor.

16.2 SCHEDULING IN LOW-VOLUME SYSTEMS The characteristics of low-volume systems (job shops) are considerably different from those of high- and intermediate-volume systems. Products are made to order, and orders usually differ considerably in terms of processing requirements, materials needed, processing time, and processing sequence and setups. Because of these circumstances, job-shop scheduling is usually fairly complex. This is compounded by the impossibility of establishing firm schedules prior to receiving the actual job orders.

Job-shop processing gives rise to two basic issues for schedulers: how to distribute the workload among work centers and what job processing sequence to use.

Loading Loading refers to the assignment of jobs to processing (work) centers. Loading decisions involve assigning specific jobs to work centers and to various machines in the work centers. In cases where a job can be processed only by a specific center, loading presents little difficulty. However, problems arise when two or more jobs are to be processed and there are a number of work centers capable of performing the required work. In such cases, the operations manager needs some way of assigning jobs to the centers.

When making assignments, managers often seek an arrangement that will minimize pro- cessing and setup costs, minimize idle time among work centers, or minimize job completion time, depending on the situation.

Gantt Charts. Visual aids called Gantt charts are used for a variety of purposes related to loading and scheduling. They derive their name from Henry Gantt, who pioneered the use of charts for industrial scheduling in the early 1900s. Gantt charts can be used in a number of different ways, two of which are illustrated in Figure 16.2 , which shows scheduling class- rooms for a university and scheduling hospital operating rooms for a day.

LO16.5 Describe scheduling needs in job shops.

Job-shop scheduling   Scheduling for low-volume systems with many variations in requirements.

Loading  The assignment of jobs to processing centers.

Gantt chart  Chart used as visual aid for loading and scheduling purposes.

FIGURE 16.2 Examples of charts used for scheduling

Classroom schedule: Fall Friday

8 9 10 11 12 1 2 3 4 5Room

A100

A105

A110

A115

Stat 1 Econ 101

Econ 102

Fin 201

Mar 210

Acct 212

Mar 410

Stat 2 Math 2a

Math 2b

Acct 210

CCE — — — — — — —

Acct 340

Mgmt 250

Math 3

Mar 220

Mar 440

Mgmt 230

Fin 310

Acct 360

City hospital, surgery schedule Date: 5/8

Operating room 7 8 9 10 11 12

A

B

C

Peters

Henderson

Dun

Anderson

Smith

Hour Scheduled

Idle

Cleaning and setup

ste24102_ch16_688-729.indd 693ste24102_ch16_688-729.indd 693 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

694 Chapter Sixteen Scheduling

The purpose of Gantt charts is to organize and visually display the actual or intended use of resources in a time framework. In most cases, a time scale is represented horizontally, and resources to be scheduled are listed vertically. The use and idle times of resources are reflected in the chart.

Managers may use the charts for trial-and-error schedule development to get an idea of what different arrangements would involve. Thus, a tentative surgery schedule might reveal insufficient allowance for surgery that takes longer than expected and can be revised accord- ingly. Use of the chart for classroom scheduling would help avoid assigning two different classes to the same room at the same time.

There are a number of different types of Gantt charts. Two of the most commonly used are the load chart and the schedule chart.

A load chart depicts the loading and idle times for a group of machines or a list of depart- ments. Figure 16.3 illustrates a typical load chart. This chart indicates that work center 3 is completely loaded for the entire week, center 4 will be available from Tuesday to Friday, and the other two centers have idle time scattered throughout the week. This information can help a manager rework loading assignments to better utilize the centers. For instance, if all centers perform the same kind of work, the manager might want to free one center for a long job or a rush order. The chart also shows when certain jobs are scheduled to start and finish, and where to expect idle time.

LO16.6 Use and interpret Gantt charts..

Load chart  A Gantt chart that shows the loading and idle times for a group of machines or list of departments.

FIGURE 16.3 A. Sample Gantt load chart. B. The same Gantt chart using the Lekin software, developed at New York University, includes multiple scheduling routines along with graphics.

Source: © Pinedo and Feldman. Used with permission.

Mon. Tues. Wed. Thurs. Fri.Work center

1

2

3

4

Job 3

Job 1

Job 10

Job 3 Job 7

Job 4

Job 6 Job 7

Processing

Center not available (e.g., maintenance)

A.

B.

ste24102_ch16_688-729.indd 694ste24102_ch16_688-729.indd 694 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 695

Infinite loading

Capacity over over

1Period 2 3 4 5 6

Finite loading

Capacity

1Period 2 3 4 5 6

Two different approaches are used to load work centers: infinite loading and finite loading. Infinite loading assigns jobs to work centers without regard to the capacity of the work cen- ter. As you can see in the diagram that follows, this can lead to overloads in some time periods and underloads in others. The priority sequencing rules described in this chapter use infinite loading. One possible result of infinite loading is the formation of queues in some (or all) work centers. That requires a second step to correct the imbalance. Finite loading projects actual job starting and stopping times at each work center, taking into account the capacities of each work center and the processing times of jobs, so that capacity is not exceeded. One output of finite loading is a detailed projection of hours each work center will operate. Schedules based on finite loading may have to be updated often, perhaps daily, due to processing delays at work centers and the addition of new jobs or cancellation of current jobs. The following diagram illustrates these two approaches:

With infinite loading, a manager may need to make some response to overloaded work centers. Among the possible responses are shifting work to other periods or other centers, working overtime, or contracting out a portion of the work. Note that the last two options in effect increase capacity to meet the workload.

Finite loading may reflect a fixed upper limit on capacity. For example, a bus line will have only so many buses. Hence, the decision to place into service a particular number of buses fixes capacity. Similarly, a manufacturer might have one specialized machine that it operates around the clock. Thus, it is operated at the upper limit of its capacity, so finite loading would be called for.

There are two general approaches to scheduling: forward scheduling and backward scheduling. Forward scheduling means scheduling ahead from a point in time; backward scheduling means scheduling backward from a due date. Forward scheduling is used if the issue is “How long will it take to complete this job?” Backward scheduling would be used if the issue is “When is the latest the job can be started and still be completed by the due date?” Forward scheduling enables the scheduler to determine the earliest possible completion time for each job and, thus, the amount of lateness or the amount of slack can be determined. That information can be combined with information from other jobs in setting up a schedule for all current jobs.

A manager often uses a schedule chart to monitor the progress of jobs. The vertical axis on this type of Gantt chart shows the orders or jobs in progress, and the horizontal axis shows time. The chart indicates which jobs are on schedule and which are behind or ahead.

A typical schedule chart is illustrated in Figure  16.4 . It shows the current status of a landscaping job with planned and actual starting and finishing times for the five stages of the job. The chart indicates that approval and the ordering of trees and shrubs was on schedule. The site preparation was a bit behind schedule. The trees were received earlier than expected, and planting is ahead of schedule. However, the shrubs have not yet been received. The chart indicates some slack between scheduled receipt of shrubs and shrub planting, so if the shrubs arrive by the end of the week, it appears the schedule can still be met.

Despite the obvious benefits of Gantt charts and the fact that they are widely used, they possess certain limitations, the chief one being the need to repeatedly update a chart to keep it

Infinite loading  Jobs are assigned to work centers without regard to the capacity of the work center.

Finite loading  Jobs are assigned to work centers taking into account the work center capacity and job processing times.

Forward scheduling   Scheduling ahead from a point in time.

Backward scheduling   Scheduling backward from a due date.

Schedule chart  A Gantt chart that shows the orders or jobs in progress and whether they are on schedule.

ste24102_ch16_688-729.indd 695ste24102_ch16_688-729.indd 695 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

696 Chapter Sixteen Scheduling

current. In addition, a chart does not directly reveal costs associated with alternative loadings. Finally, a job’s processing time may vary depending on the work center; certain stations or work centers may be capable of processing some jobs faster than other stations. Again, that situation would increase the complexity of evaluating alternative schedules.

In addition to Gantt charts, managers often rely on input/output reports to manage work flow.

Input/Output Control. Input/output (I/O) control refers to monitoring the work flow and queue lengths at work centers. The purpose of I/O control is to manage work flow so that queues and waiting times are kept under control. Without I/O control, demand may exceed processing capacity, causing an overload at a center. Conversely, work may arrive slower than the rate a work center can handle, leaving the work center underutilized. Ideally, a balance can be struck between the input and output rates, thereby achieving effective use of work center capacities without experiencing excessive queues at the work centers. A simple example of I/O control is the use of stoplights on some expressway on-ramps. These regulate the flow of entering traffic according to the current volume of expressway traffic.

Figure  16.5 illustrates an input/output report for a work center. A key portion of the report is the backlog of work waiting to be processed. The report also reveals deviations- from-planned for both inputs and outputs, thereby enabling a manager to determine possible sources of problems.

The deviations in each period are determined by subtracting “planned” from “actual.” For example, in the first period, subtracting the planned input of 100 hours from the actual input

Input/output (I/O) control   Managing work flow and queues at work centers.

FIGURE 16.4 Progress chart for landscaping job

1Stage

Drawings

Site

Trees

Shrubs

Final inspection

2 3 4 5 6 7

[Approval]

[Preparation]

[Order]

[Order] [Plant]

[Approval]

[Plant]

[Receive]

[Receive]

NowScheduled

Actual progress

[ ]

FIGURE 16.5 A sample input/output report for a work center showing input and output in hours of processing time

Note: Figures represent standard hours of processing time.

*Given, not derived from the data.

1

Input

Output

Planned 100 100 90 90 90 90

Actual 120 95 80 88 93 94

Deviation �20 �5 �10 �2 �3 �4

Cum. dev. �20 �15 �5 �3 �6 �10

Planned 110 110 100 100 100 95

Actual 110 105 95 101 103 96

Deviation 0 �5 �5 �1 �3 �1

Cum. dev. 0 �5 �10 �9 �6 �5

2 3

Period

4 5 6

5040*Backlog 40 25 12 2 0

ste24102_ch16_688-729.indd 696ste24102_ch16_688-729.indd 696 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 697

of 120 hours produces a deviation of � 20 hours. Similarly, in the first period, the planned and actual outputs are equal, producing a deviation of 0 hours.

The backlog for each period is determined by subtracting the “actual output” from the “actual input” and adjusting the backlog from the previous period by that amount. For exam- ple, in the second period actual output exceeds actual input by 10 hours. Hence, the previous backlog of 50 hours is reduced by 10 hours to 40 hours.

Another approach that can be used to assign jobs to resources is the assignment method.

Assignment Method of Linear Programming. The assignment model is a special- purpose linear programming model that is useful in situations that call for assigning tasks or other work requirements to resources. Typical examples include assigning jobs to machines or workers, territories to salespeople, and repair jobs to repair crews. The idea is to obtain an optimum matching of tasks and resources. Commonly used criteria include costs, profits, efficiency, and performance.

Table 16.1 illustrates a typical problem, where four jobs are to be assigned to four workers. The problem is arranged in a format that facilitates evaluation of assignments. The numbers in the body of the table represent the value or cost associated with each job–worker combina- tion. In this case, the numbers represent costs. Thus, it would cost $8 for worker A to do job 1, $6 for worker B to do job 1, and so on. If the problem involved minimizing the cost for job 1 alone, it would clearly be assigned to worker C, since that combination has the lowest cost. However, that assignment does not take into account the other jobs and their costs, which is important since the lowest-cost assignment for any one job may not be consistent with a minimum-cost assignment when all jobs are considered.

If there are to be n matches, there are n! different possibilities. In this case, there are 4!  �  24 different matches. One approach is to investigate each match and select the one with the lowest cost. However, if there are 12 jobs, there would be 479 million different matches! A much simpler approach is to use a procedure called the Hungarian method to identify the lowest-cost solution.

To be able to use the Hungarian method, a one-for-one matching is required. Each job, for example, must be assigned to only one worker. It is also assumed that every worker is capable of handling every job, and that the costs or values associated with each assignment combina- tion are known and fixed (i.e., not subject to variation). The number of rows and columns must be the same. Solved Problem 1 at the end of the chapter shows what to do if they aren’t the same.

Once the relevant cost information has been acquired and arranged in tabular form, the basic procedure of the Hungarian method is as follows:

1. Subtract the smallest number in each row from every number in the row. This is called a row reduction. Enter the results in a new table.

2. Subtract the smallest number in each column of the new table from every number in the column. This is called a column reduction. Enter the results in another table.

3. Test whether an optimum assignment can be made. You do this by determining the mini- mum number of lines (horizontal or vertical) needed to cross out (cover) all zeros. If the number of lines equals the number of rows, an optimum assignment is possible. In that case, go to step 6. Otherwise go on to step 4.

4. If the number of lines is less than the number of rows, modify the table in this way: a. Subtract the smallest uncovered number from every uncovered number in the table. b. Add the smallest uncovered number to the numbers at intersections of cross-out lines. c. Numbers crossed out but not at intersections of cross-out lines carry over to the

next table.

5. Repeat steps 3 and 4 until an optimal table is obtained.

6. Make the assignments. Begin with rows or columns with only one zero. Match items that have zeros, using only one match for each row and each column. Eliminate both the row and the column after the match.

LO16.7 Use the assignment method for loading.

Assignment model  A linear programming model for optimal assignment of tasks and resources.

Hungarian method  Method of assigning jobs by a one-for- one matching to identify the lowest-cost solution.

WORKER

A B C D

Job

1 8 6 2 4 2 6 7 11 10 3 3 5 7 6 4 5 10 12 9

TABLE 16.1 A typical assignment problem showing job times for each job/ worker combination

SCREENCAM TUTORIAL

ste24102_ch16_688-729.indd 697ste24102_ch16_688-729.indd 697 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

698 Chapter Sixteen Scheduling

Determine the optimum assignment of jobs to workers for the following data (from Table 16.1 ):

WORKER

A B C D Row

Minimum

1 8 6 2 4 2

Job 2 6 7 11 10 6

3 3 5 7 6 3

4 5 10 12 9 5

e celx mhhe.com/stevenson12e

E X A M P L E 1

S O L U T I O N a. Subtract the smallest number in each row from every number in the row, and enter the results in a new table. The result of this row reduction is

WORKER

A B C D

Job

1 6 4 0 2

2 0 1 5 4

3 0 2 4 3

4 0 5 7 4

Column Minimum 0 1 0 2

b. Subtract the smallest number in each column from every number in the column, and enter the results in a new table. The result of this column reduction is

WORKER

A B C D

Job

1 6 3 0 0

2 0 0 5 2

3 0 1 4 1

4 0 4 7 2

c. Determine the minimum number of lines needed to cross out all zeros. (Try to cross out as many zeros as possible when drawing lines.)

WORKER

A B C D

Job

1 6 3 0 0

2 0 0 5 2

3 0 1 4 1

4 0 4 7 2

d. Since only three lines are needed to cross out all zeros and the table has four rows, this is not the optimum. Note that the smallest uncovered value is 1.

e. Subtract the smallest uncovered value from every uncovered number that hasn’t been crossed out, and add it to numbers that are at the intersections of covering lines. The results are as follows:

WORKER

A B C D

Job

1 7 3 0 0

2 1 0 5 2

3 0 0 3 0

4 0 3 6 1

ste24102_ch16_688-729.indd 698ste24102_ch16_688-729.indd 698 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 699

f. Determine the minimum number of lines needed to cross out all zeros (four). Since this equals the number of rows, you can make the optimum assignment.

WORKER

A B C D

Job 1 7 3 0 0

2 1 0 5 2

3 0 0 3 0

4 0 3 6 1

g. Make assignments: Start with rows and columns with only one zero. Match jobs with machines that have a zero cost.

WORKER

A B C D

1 7 3 0 0

Job 2 1 0 5 2

3 0 0 3 0

4 0 3 6 1

The assignment problem can also be solved using an Excel template, as seen in Table 16.2 . The ones in the solution matrix denote assignments (i.e., assign C to job 1), and the zeros denote no assignment for a worker/machine and job combination.

Assignment Cost

1-C $ 2

2-B 7

3-D 6

4-A 5

$20

TABLE 16.2 Excel solution to Example 1

As you can see, the process is relatively simple. The simplicity of the Hungar- ian method belies its usefulness when the assumptions are met. Not only does it pro- vide a rational method for making assignments, it guarantees an optimal solution, often without the use of a computer, which is necessary only for fairly large problems.

ste24102_ch16_688-729.indd 699ste24102_ch16_688-729.indd 699 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

700 Chapter Sixteen Scheduling

Local priority rules  Focus on information pertaining to a single workstation when establishing a job sequence.

Global priority rules   Incorporate information from multiple workstations when establishing a job sequence.

When profits instead of costs are involved, the profits can be converted to relative costs by subtracting every number in the table from the largest number and then proceeding as in a minimization problem.

It is worth knowing that one extension of this technique can be used to prevent undesirable assignments. For example, union rules may prohibit one person’s assignment to a particular job, or a manager might wish to avoid assigning an unqualified person to a job. Whatever the reason, specific combinations can be avoided by assigning a relatively high cost to that combination. In the previous example, if we wish to avoid combination 1-A, assigning a cost of $50 to that combination will achieve the desired effect, because $50 is much greater than the other costs.

Sequencing Although loading decisions determine the machines or work centers that will be used to process specific jobs, they do not indicate the order in which the jobs waiting at a given work center are to be processed. Sequencing is concerned with determining job processing order. Sequencing decisions determine both the order in which jobs are processed at various work centers and the order in which jobs are processed at individual workstations within the work centers.

If work centers are lightly loaded and if jobs all require the same amount of processing time, sequencing presents no particular difficulties. However, for heavily loaded work cen- ters, especially in situations where relatively lengthy jobs are involved, the order of process- ing can be very important in terms of costs associated with jobs waiting for processing and in terms of idle time at the work centers. In this section, we will examine some of the ways in which jobs are sequenced.

Typically, a number of jobs will be waiting for processing. Priority rules are simple heu- ristics used to select the order in which the jobs will be processed. Some of the most common are listed in Table  16.3 . The rules generally rest on the assumption that job setup cost and time are independent of processing sequence. In using these rules, job processing times and due dates are important pieces of information. Job time usually includes setup and processing times. Jobs that require similar setups can lead to reduced setup times if the sequencing rule takes this into account (the rules described here do not). Due dates may be the result of delivery times promised to customers, material requirements planning (MRP) processing, or managerial decisions. They are subject to revision and must be kept current to give meaning to sequencing choices. Also, it should be noted that due dates associated with all rules except slack per opera- tion (S/O) and critical ratio (CR) are for the operation about to be performed; due dates for S/O and CR are typically final due dates for orders rather than intermediate, departmental deadlines.

The priority rules can be classified as either local or global. Local priority rules take into account information pertaining only to a single workstation; global priority rules take into account information pertaining to multiple workstations. First come, first served (FCFS), shortest processing time (SPT), and earliest due date (EDD) are local rules; CR and S/O are global rules. Rush can be either local or global. As you might imagine, global rules require more effort than local rules. A major complication in global sequencing is that not all jobs

Sequencing  Determining the order in which jobs at a work center will be processed.

Workstation  An area where one or a few workers and/or machines perform similar work.

Priority rules  Simple heuristics used to select the order in which jobs will be processed.

Job time  Time needed for setup and processing of a job.

First come, first served (FCFS): Jobs are processed in the order in which they arrive at a machine or work center.

Shortest processing time (SPT): Jobs are processed according to processing time at a machine or work center, shortest job first.

Earliest due date (EDD): Jobs are processed according to due date, earliest due date first. Critical ratio (CR): Jobs are processed according to smallest ratio of time remaining until due date to

processing time remaining. Slack per operation (S/O): Jobs are processed according to average slack time (time until due date minus

remaining time to process). Compute by dividing slack time by number of remaining operations, including the current one.

Rush: Emergency or preferred customers first.

LO16.8 Give examples of commonly used priority rules.

TABLE 16.3 Possible priority rules

ste24102_ch16_688-729.indd 700ste24102_ch16_688-729.indd 700 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 701

require the same processing or even the same order of processing. As a result, the set of jobs is different for different workstations. Local rules are particularly useful for bottleneck opera- tions, but they are not limited to those situations.

A number of assumptions apply when using the priority rules; Table 16.4 lists them. In effect, the priority rules pertain to static sequencing: For simplicity, it is assumed that there is no variability in either setup or processing times, or in the set of jobs. The assumptions make the scheduling problem manageable. In practice, jobs may be delayed or canceled, and new jobs may arrive, requiring schedule revisions.

The effectiveness of any given sequence is frequently judged in terms of one or more per- formance measures. The most frequently used performance measures follow:

• Job flow time is the amount of time it takes from when a job arrives until it is com- plete. It includes not only actual processing time but also any time waiting to be processed, transportation time between operations, and any waiting time related to equipment breakdowns, unavailable parts, quality problems, and so on. The average flow time for a group of jobs is equal to the total flow time for the jobs divided by the number of jobs.

• Job lateness is the amount of time the job completion date is expected to exceed the date the job was due or promised to a customer. It is the difference between the actual completion time and the due date. If only differences for jobs with completion times that exceed due dates are recorded, and zeros are assigned to jobs that are early, the term used is job tardiness.

• Makespan is the total time needed to complete a group of jobs. It is the length of time between the start of the first job in the group and the completion of the last job in the group. If processing involves only one work center, makespan will be the same regard- less of the priority rule being used.

• Average number of jobs. Jobs that are in a shop are considered to be work-in-process inventory. The average work-in-process for a group of jobs can be computed using the following formula:

Average number of jobs Total flow time Makespan� �

If the jobs represent equal amounts of inventory, the average number of jobs will also reflect the average work-in-process inventory.

Of the priority rules, rush scheduling is quite simple and needs no explanation. The other rules and performance measures are illustrated in the following two examples.

Job flow time  The amount of time from when a job arrives until it is finished.

Job lateness  The difference between the actual completion date and the due date.

Makespan  Total time needed to complete a group of jobs from the beginning of the first job to the completion of the last job.

The set of jobs is known; no new jobs arrive after processing begins; and no jobs are canceled. Setup time is independent of processing sequence. Setup time is deterministic. Processing times are deterministic rather than variable. There will be no interruptions in processing such as machine breakdowns, accidents, or

worker illness.

TABLE 16.4 Assumptions of priority rules

Processing times (including setup times) and due dates for six jobs waiting to be processed at a work center are given in the following table. Determine the sequence of jobs, the average flow time, average tardiness, and average number of jobs at the work center, for each of these rules:

a. FCFS

b. SPT

e celx mhhe.com/stevenson12e

E X A M P L E 2

ste24102_ch16_688-729.indd 701ste24102_ch16_688-729.indd 701 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

702 Chapter Sixteen Scheduling

c. EDD

d. CR

Job Processing Time (days)

Due Date (days from

present time)

A 2 7

B 8 16

C 4 4

D 10 17

E 5 15

F 12 18

Assume jobs arrived in the order shown.

S O L U T I O N a. The FCFS sequence is simply A-B-C-D-E-F. The measures of effectiveness are as fol- lows (see table): (1) Average flow time: 120/6  �  20 days.

(2) Average tardiness: 54/6  �  9 days.

(3) The makespan is 41 days. Average number of jobs at the work center: 120/41  �  2.93.

Job Sequence

(1) Processing

Time

(2) Flow Time

(3) Due Date

(2) – (3) Days Tardy

[0 if negative]

A 2 2 7 0

B 8 10 16 0

C 4 14 4 10

D 10 24 17 7

E 5 29 15 14

F 12 41 18 23

41 120 54

The flow time column indicates cumulative processing time, so summing these times and dividing by the total number of jobs processed indicates the average time each job spends at the work center. Similarly, find the average number of jobs at the center by summing the flow times and dividing by the total processing time.

The Excel solution is shown in Table 16.5.

b. Using the SPT rule, the job sequence is A-C-E-B-D-F (see the following table). The resulting values for the three measures of effectiveness are (1) Average flow time: 108/6  �  18 days.

(2) Average tardiness: 40/6  �  6.67 days.

(3) Average number of jobs at the work center: 108/41  �  2.63.

Job Sequence

(1) Processing

Time

(2) Flow Time

(3) Due Date

(2) – (3) Days Tardy

[0 if negative]

A 2 2 7 0

C 4 6 4 2

E 5 11 15 0

B 8 19 16 3

D 10 29 17 12

F 12 41 18 23

41 108 40

ste24102_ch16_688-729.indd 702ste24102_ch16_688-729.indd 702 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 703

c. Using earliest due date as the selection criterion, the job sequence is C-A-E-B-D-F. The measures of effectiveness are as follows (see table): (1) Average flow time: 110/6  �  18.33 days.

(2) Average tardiness: 38/6  �  6.33 days.

(3) Average number of jobs at the work center: 110/41  �  2.68.

Job Sequence

(1) Processing

Time

(2) Flow Time

(3) Due Date

(2) – (3) Days Tardy

[0 if negative]

C 4 4 4 0

A 2 6 7 0

E 5 11 15 0

B 8 19 16 3

D 10 29 17 12

F 12 41 18 23

41 110 38

TABLE 16.5 Excel solution for Example 2a

ste24102_ch16_688-729.indd 703ste24102_ch16_688-729.indd 703 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

704 Chapter Sixteen Scheduling

d. Using the critical ratio we find

Job Sequence

Processing Time

Due Date

Critical Ratio Calculation

A 2 7 (7  �  0)/ 2  �  3.5

B 8 16 (16  �  0)/ 8  �  2.0

C 4 4 (4  �  0)/ 4  �  1.0 (lowest)

D 10 17 (17  �  0)/10  �  1.7

E 5 15 (15  �  0)/ 5  �  3.0

F 12 18 (18  �  0)/12  �  1.5

At day 4 [C completed], the critical ratios are

Job Sequence

Processing Time

Due Date

Critical Ratio Calculation

A 2 7 (7  �  4)/ 2  �  1.5

B 8 16 (16  �  4)/ 8  �  1.5

C — — —

D 10 17 (17  �  4)/10  �  1.3

E 5 15 (15  �  4)/ 5  �  2.2

F 12 18 (18  �  4)/12  �  1.17 (lowest)

At day 16 [C and F completed], the critical ratios are

Job Sequence

Processing Time

Due Date

Critical Ratio Calculation

A 2 7 (7  �  16)/ 2  �   � 4.5 (lowest)

B 8 16 (16  �  16)/ 8  �  0.0

C — — —

D 10 17 (17  �  16)/10  �  0.1

E 5 15 (15  �  16)/ 5  �   � 0.2

F — — —

At day 18 [C, F, and A completed], the critical ratios are

Job Sequence

Processing Time

Due Date

Critical Ratio Calculation

A — — —

B 8 16 (16  �  18)/ 8  �   � 0.25

C — — —

D 10 17 (17  �  18)/10  �   � 0.10

E 5 15 (15  �  18)/ 5  �   � 0.60 (lowest)

F — — —

At day 23 [C, F, A, and E completed], the critical ratios are

Job Sequence

Processing Time

Due Date

Critical Ratio Calculation

A — — —

B 8 16 (16  �  23)/ 8  �   � 0.875 (lowest)

C — — —

D 10 17 (17  �  23)/10  �   � 0.60

E — — —

F — — —

The job sequence is C-F-A-E-B-D, and the resulting values for the measures of effectiveness are as follows:

(1) Average flow time: 133/6  �  22.17 days.

(2) Average tardiness: 58/6  �  9.67 days.

(3) Average number of jobs at the work center: 133/41  �  3.24.

ste24102_ch16_688-729.indd 704ste24102_ch16_688-729.indd 704 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 705

Sequence

(1) Processing

Time (2)

Flow Time

(3) Due Date

(2) – (3) Days Tardy

C 4 4 4 0

F 12 16 18 0

A 2 18 7 11

E 5 23 15 8

B 8 31 16 15

D 10 41 17 24

41 133 58

The results of these four rules are summarized in Table 16.6 .

TABLE 16.6 Comparison of the four rules for Example 2

In Example 2, the SPT rule was the best according to two of the measures of effectiveness and a little worse than the EDD rule on average tardiness. The CR rule was the worst in every case. For a different set of numbers, the EDD rule (or perhaps another rule not mentioned here) might prove superior to SPT in terms of average job tardiness or some other measure of effectiveness. However, SPT is always superior in terms of minimizing flow time and, hence, in terms of minimizing the average number of jobs at the work center and completion time. This results in faster job completion, which has the potential to generate more revenue.

Generally speaking, the FCFS rule and the CR rule turn out to be the least effective of the rules.

The primary limitation of the FCFS rule is that long jobs will tend to delay other jobs. If a process consists of work on a number of machines, machine idle time for downstream work- stations will increase. However, for service systems in which customers are directly involved, the FCFS rule is by far the dominant priority rule, mainly because of the inherent fairness but also because of the inability to obtain realistic estimates of processing time for individual jobs. The FCFS rule also has the advantage of simplicity. If other measures are important when there is high customer contact, companies may adopt the strategy of moving processing to the “backroom” so they don’t necessarily have to follow FCFS.

Because the SPT rule always results in the lowest (i.e., optimal) average completion (flow) time, it can result in lower in-process inventories. And because it often provides the lowest (optimal) average tardiness, it can result in better customer service levels. Finally, since it always involves a lower average number of jobs at the work center, there tends to be less con- gestion in the work area. SPT also minimizes downstream idle time. However, due dates are often uppermost in managers’ minds, so they may not use SPT because it doesn’t incorporate due dates.

The major disadvantage of the SPT rule is that it tends to make long jobs wait, perhaps for rather long times (especially if new, shorter jobs are continually added to the system). That can be troubling if long jobs are from the company’s best customers. Various modifications may be used in an effort to avoid this. For example, after waiting for a given time period, any remaining jobs are automatically moved to the head of the line. This is known as the truncated SPT rule.

Rule

Average Flow Time

(days)

Average Tardiness

(days)

Average Number of Jobs at the Work Center

FCFS 20.00 9.00 2.93 SPT 18.00 6.67 2.63 EDD 18.33 6.33 2.68 CR 22.17 9.67 3.24

ste24102_ch16_688-729.indd 705ste24102_ch16_688-729.indd 705 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

706 Chapter Sixteen Scheduling

The EDD rule directly addresses due dates and minimizes lateness. Although it has intui- tive appeal, its main limitation is that it does not take processing time into account. One pos- sible consequence is that it can result in some jobs waiting a long time, which adds to both in-process inventories and shop congestion.

The CR rule is easy to use and has intuitive appeal. Although it had the poorest showing in Example 2 for all three measures, it usually does quite well in terms of minimizing job tardi- ness. Therefore, if job tardiness is important, the CR rule might be the best choice among the rules.

Let’s take a look now at the S/O (slack per operation) rule.

Use the S/O rule to schedule the following jobs. Note that processing time includes the time remaining for the current and subsequent operations. In addition, you will need to know the number of operations remaining, including the current one.

Job

Remaining Processing

Time Due Date

Remaining Number of Operations

A 4 14 3

B 16 32 6

C 8 8 5

D 20 34 2

E 10 30 4

F 18 30 2

e celx mhhe.com/stevenson12e

E X A M P L E 3

S O L U T I O N Determine the difference between the due date and the processing time for each operation. Divide the difference by the number of remaining operations, and rank them from low to high. This yields the sequence of jobs:

Job

(1) Remaining Processing

Time

(2)

Due Date

(3)

(2) � (1) Slack

(4) Remaining Number of Operations

 (5)

(3)  �  (4) Ratio

(6)

Rank

A 4 14 10 3 3.33 3

B 16 32 16 6 2.67 2

C 8 8 0 5 0 1

D 20 34 14 2 7.00 6

E 10 30 20 4 5.00 4

F 18 30 12 2 6.00 5

The indicated sequence (see column 6) is C-B-A-E-F-D.

Using the S/O rule, the designated job sequence may change after any given operation, so if that happened, it would be necessary to reevaluate the sequence after each operation. Note that any of the previously mentioned priority rules could be used on a station-by-station basis for this situation; the only difference is that the S/O approach incorporates downstream infor- mation in arriving at a job sequence.

In reality, many priority rules are available to sequence jobs, and some other rule might provide superior results for a given set of circumstances. The purpose in examining these few rules is to provide insight into the nature of sequencing rules. Each shop or organization should consider carefully its own circumstances and the measures of effectiveness it feels are important, when selecting a rule to use.

The following section describes a special-purpose algorithm that can be used to sequence a set of jobs that must all be processed at the same two machines or work centers.

ste24102_ch16_688-729.indd 706ste24102_ch16_688-729.indd 706 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 707

Sequencing Jobs through Two Work Centers 1 Johnson’s rule is a technique that managers can use to minimize the makespan for a group of jobs to be processed on two machines or at two successive work centers (sometimes referred to as a two-machine flow shop). 2 It also minimizes the total idle time at the work centers. For the technique to work, several conditions must be satisfied:

• Job time (including setup and processing) must be known and constant for each job at each work center.

• Job times must be independent of the job sequence.

• All jobs must follow the same two-step work sequence.

• A job must be completed at the first work center before the job moves on to the second work center.

Application of Johnson’s rule begins with a listing of all jobs to be scheduled, and how much time will be required by each job at each workstation. The sequence is determined by following these steps:

1. Select the job with the shortest time. If the shortest time is at the first work center, schedule that job first; if the time is at the second work center, schedule the job last. Break ties arbitrarily.

2. Eliminate the job and its time from further consideration.

3. Repeat steps 1 and 2, working toward the center of the sequence, until all jobs have been scheduled.

Successful application of these steps identifies the sequence with the minimum makespan, or all work is completed as soon as possible. However, precisely when a certain job will be completed (its flow time) or when idle time will occur is not apparent by inspecting the sequence. To determine such detailed performance information, it is generally easiest to create a Gantt chart illustrating the finished sequence, as demonstrated in Example 4.

When significant idle time at the second work center occurs, job splitting at the first center just prior to the occurrence of idle time may alleviate some of it and also shorten throughput time. In Example 4, this is not a concern. The last solved problem at the end of this chapter illustrates the use of job splitting.

Johnson’s rule  Technique for minimizing makespan for a group of jobs to be processed on two machines or at two work centers.

1 For a description of a heuristic that can be used for the case where a set of jobs is to be processed through more than two work centers, see Thomas Vollmann et al., Manufacturing Planning and Control Systems, 5th ed. (New York: Irwin/McGraw-Hill, 2004).

2 S. M. Johnson, “Optimal Two- and Three-Stage Production with Setup Times Included,” Naval Research Quarterly 1 (March 1954), pp. 61–68.

A group of six jobs is to be processed through a two-machine flow shop. The first operation involves cleaning and the second involves painting. Determine a sequence that will minimize the total completion time for this group of jobs. Processing times are as follows:

PROCESSING TIME (hours)

Job Work Center 1 Work Center 2

A 5 5

B 4 3

C 8 9

D 2 7

E 6 8

F 12 15

To employ Johnson’s rule, create a “blank” sequence first, such as:

1st 2nd 3rd 4th 5th 6th

e celx mhhe.com/stevenson12e

E X A M P L E 4

ste24102_ch16_688-729.indd 707ste24102_ch16_688-729.indd 707 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

708 Chapter Sixteen Scheduling

20 8 16 28 33 37

20 9 17 26 28 43 48 51

Time

Center 2

Center 1

Time

D E C F A B

D

BD E C F A

BAFCE

Idle

a. Select the job with the shortest processing time. It is job D, with a time of two hours.

b. Since the time is at the first center, schedule job D first. Eliminate job D from further consideration.

c. Job B has the next shortest time. Since it is at the second work center, schedule it last and eliminate job B from further consideration. We now have

d. The remaining jobs and their times are

Job 1 2

A 5 5

C 8 9

E 6 8

F 12 15

Note that there is a tie for the shortest remaining time; job A has the same time at each work center. It makes no difference, then, whether we place it toward the beginning or the end of the sequence. Suppose it is placed arbitrarily toward the end. We now have

e. The shortest remaining time is six hours for job E at work center 1. Thus, schedule that job toward the beginning of the sequence (after job D):

f. Job C has the shorter time of the remaining two jobs. Since it is for the first work center, place it third in the sequence. Finally, assign the remaining job (F) to the fourth position and the result is

g. Construct a Gantt chart to reveal flow time and idle time information. Be very careful not to schedule the beginning of work at center 2 before work at center 1 has been completed for any given job. Traditionally, it is assumed that center 1 must finish and pass the job to center 2, which can cause idle time in center 2’s schedule, such as in the case of job F below:

1st 2nd 3rd 4th 5th 6th

D

1st 2nd 3rd 4th 5th 6th

D B

1st 2nd 3rd 4th 5th 6th

D BA

1st 2nd 3rd 4th 5th 6th

D BAE

1st 2nd 3rd 4th 5th 6th

D BAE C F

S O L U T I O N

ste24102_ch16_688-729.indd 708ste24102_ch16_688-729.indd 708 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 709

Thus, the group of jobs will take 51 hours to complete. The second work center will wait two hours for its first job and also wait two hours after finishing job C. Center 1 will be fin- ished in 37 hours. Of course, idle periods at the beginning or end of the sequence could be used to do other jobs or for maintenance or setup/teardown activities.

Sequencing Jobs When Setup Times Are Sequence-Dependent The preceding discussion and examples assumed that machine setup times are independent of processing order, but in many instances that assumption is not true. Consequently, a manager may want to schedule jobs at a workstation taking those dependencies into account. The goal is to minimize total setup time.

Consider the following table, which shows workstation machine setup times based on job processing order. For example, if job A is followed by job B, the setup time for B will be six hours. Furthermore, if job A is completed first, followed by job B, job C will then follow job B and have a setup time of four hours. If a job is done first, its setup time will be the amount shown in the setup time column to the right of the job. Thus, if job A is done first, its setup time will be three hours.

The simplest way to determine which sequence will result in the lowest total setup time is to list each possible sequence and determine its total setup time. In general, the num- ber of different alternatives is equal to n! , where n is the number of jobs. Here, n is 3, so n!   �  3  �  2  �  1  �  6. The six alternatives and their total setup times are as follows:

Hence, to minimize total setup time, the manager would select sequence B-A-C. This procedure is relatively simple to do manually when the number of jobs is two or three.

However, as the number of jobs increases, the list of alternatives quickly becomes larger. For example, six jobs would have 720 alternatives. In such instances, a manager would employ a computer to generate the list and identify the best alternative(s). (Note that more than one alternative may be tied for the lowest setup time.)

Why Scheduling Can Be Difficult Scheduling can be difficult for a number of reasons. One is that, in reality, an operation must deal with variability in setup times, processing times, interruptions, and changes in the set of

Resulting following job setup time (hrs.) is

Setup time (hrs.) A B C

If the preceding

job is

A 3 — 6 2

B 2 1 — 4

C 2 5 3 —

Sequence Setup Times Total

A-B-C 3  �  6  �  4  �  13 A-C-B 3  �  2  �  3  �  8 B-A-C 2  �  1  �  2  �  5 ( best ) B-C-A 2  �  4  �  5  �  11 C-A-B 2  �  5  �  6  �  13 C-B-A 2  �  3  �  1  �  6

ste24102_ch16_688-729.indd 709ste24102_ch16_688-729.indd 709 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

710 Chapter Sixteen Scheduling

jobs. Another major reason is that, except for small job sets, there is no method for identifying the optimal schedule, and it would be virtually impossible to sort through the vast number of possible alternatives to obtain the best schedule. As a result, scheduling is far from an exact science and, in many instances, is an ongoing task for a manager.

Computer technology reduces the burden of scheduling and makes real-time scheduling possible.

Minimizing Scheduling Difficulties There are a number of actions that managers can consider to minimize scheduling problems:

• Setting realistic due dates.

• Focusing on bottleneck operations: First, try to increase the capacity of the operations. If that is not possible or feasible, schedule the bottleneck operations first, and then schedule the nonbottleneck operations around the bottleneck operations.

• Considering lot splitting for large jobs. This usually works best when there are relatively large differences in job times. Note that this doesn’t apply to single-unit jobs.

The Theory of Constraints Another approach to scheduling was developed and promoted by Eli Goldratt. 3 He first described it in his book The Goal. Goldratt avoided much of the complexity often associated with scheduling problems by simply focusing on bottleneck operations (i.e., those for which there was insufficient capacity—in effect, a work center with zero

idle time). He reasoned the output of the system was limited by the output of the bottleneck operation(s); therefore, it was essential to schedule the nonbottleneck operations in a way that minimized the idle time of the bottleneck operation(s). Thus, idle time of nonbottleneck operations was not a factor in overall productivity of the system, as long as the bottleneck operations were used effectively. These observations have been refined into a series of sched- uling principles which include:

• An hour lost at a bottleneck operation is an hour lost by the system. The bottleneck operation determines the overall capacity of the system.

• Saving time through improvements of a nonbottleneck will not increase the ultimate output of the system.

• Activation of a resource is not the same as utilization of a resource. Because a nonbot- tleneck operation is active does not necessarily mean it is being useful.

These principles are also the foundation of a specific scheduling technique for intermittent production systems, one that many firms have found simpler and less time-consuming to use than traditional analytical techniques. This technique uses a drum-buffer-rope conceptualiza- tion to manage the system. The “drum” is the schedule; it sets the pace of production. The goal is to schedule to make maximum use of bottleneck resources. The “buffer” refers to potentially constraining resources outside of the bottleneck. The role of the buffer is to keep a small amount of inventory ahead of the bottleneck operation to minimize the risk of having it be idle. The “rope” represents the synchronizing of the sequence of operations to ensure effec- tive use of the bottleneck operations. The goal is to avoid costly and time-consuming multiple setups, particularly of capacity-constrained resources, so they do not become bottlenecks too.

The drum-buffer-rope approach provides a basis for developing a schedule that achieves maximum output and shorter lead times while avoiding carrying excess inventory. Use of

LO16.9 Discuss the theory of constraints and that approach to scheduling.

3 Eli Goldratt, The General Theory of Constraints (New Haven, CT: Avraham Y. Institute, 1989).

ste24102_ch16_688-729.indd 710ste24102_ch16_688-729.indd 710 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 711

the drum-buffer-rope approach generally results in operations capable of consistent on-time delivery, reduced inventory, and shorter lead times, as well as a reduction in disruptions that require expediting.

Goldratt also developed a system of varying batch sizes to achieve the greatest output of bottleneck operations. He used the term process batch to denote the basic lot size for a job and the term transfer batch to denote a portion of the basic lot that could be used during pro- duction to facilitate utilization of bottleneck operations. In effect, a lot could be split into two or more parts. Splitting a large lot at one or more operations preceding a bottleneck operation would reduce the waiting time of the bottleneck operation.

Traditional management has emphasized maximizing output of every operation. In con- trast to that approach, the theory of constraints has as its goal maximizing flow through the entire system, which it does by emphasizing balancing the flow through the various opera- tions. It begins with identifying the bottleneck operation. Next, there is a five-step procedure to improve the performance of the bottleneck operation:

1. Determine what is constraining the operation.

2. Exploit the constraint (i.e., make sure the constraining resource is used to its maximum).

3. Subordinate everything to the constraint (i.e., focus on the constraint).

4. Determine how to overcome (eliminate) the constraint.

5. Repeat the process for the next highest constraint.

(Note the similarity to the plan-do-study-act [PDSA] approach discussed in Chapter 9.) The goal, of course, is to make money. The theory of constraints uses three metrics to

assess the effectiveness of improvements:

• Throughput: the rate at which the system generates money through sales (i.e., the con- tribution margin, or sales revenue less variable costs; labor costs are considered to be part of operating expense).

• Inventory: Inventory represents money tied up in goods and materials used in a process.

• Operating expense: all the money the system spends to convert inventory into throughput; this includes utilities, scrap, depreciation, and so on.

Goldratt’s ideas are applicable to both manufacturing and service environments.

16.3 SCHEDULING SERVICES Scheduling service systems presents certain problems not generally encountered in manu- facturing systems. This is due primarily to (1) the inability to store or inventory services and (2) the random nature of customer requests for service. In some situations, the second difficulty can be moderated by using appointment or reservation systems, but the inability to store services in most cases is a fact of life that managers must contend with.

The approach used to schedule services generally depends on whether customer contact is involved. In back-office operations, where there is little or no customer contact—such as processing mail-order requests, loan approvals, and tax preparation—the same priority rules described in the preceding pages are used. The goal is to maximize worker efficiency, and work is often processed in batches. A key factor can be the due date, say for rush orders, orders where the customer has paid a premium for faster than normal delivery. That is similar to the situation that occurs in front-office operations, where there is a high degree of customer contact, and efficiency may become secondary to keeping customer waiting times to reason- able levels, so scheduling the workforce to meet demand becomes a priority. Having too few workers causes waiting lines to form, but having more workers than needed increases labor costs, which can have a substantial impact on profits, particularly in service systems where labor is the major cost involved.

Process batch  The economical quantity to produce upon the activation of a given operation.

Transfer batch  The quantity to be transported from one operation to another, assumed to be smaller than the first operation’s process batch.

Theory of constraints   Production planning approach that emphasizes balancing flow throughout a system, and pursues a perpetual five-step improvement process centered around the system’s currently most restrictive constraint.

LO16.10 Summarize some of the unique problems encountered in service systems, and describe some of the approaches used for scheduling service systems.

ste24102_ch16_688-729.indd 711ste24102_ch16_688-729.indd 711 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

712 Chapter Sixteen Scheduling

An ideal situation is one that has a smooth flow of customers through the system. This would occur if each new customer arrives at the precise instant that the preceding customer’s service is completed, as in a physician’s office, or in air travel if the demand just equals the number of available seats. In each of these situations customer waiting time would be mini- mized, and the service system staff and equipment would be fully utilized. Unfortunately, the random nature of customer requests for service that generally prevails in service systems makes it nearly impossible to provide service capability that matches demand. Moreover, if service times are subject to variability—say, because of differing processing requirements— the inefficiency of the system is compounded. The inefficiencies can be reduced if arrivals can be scheduled (e.g., appointments), as in the case of doctors and dentists. However, in many situations appointments are not possible (supermarkets, gas stations, theaters, hospital emergency rooms, repair of equipment breakdowns). Chapter 18, on waiting lines, focuses on those kinds of situations. There, the emphasis is on intermediate-term decisions related to service capacity. In this section, we will concern ourselves with short-term scheduling, in which much of the capacity of a system is essentially fixed, and the goal is to achieve a certain degree of customer service by efficient utilization of that capacity.

Scheduling in service systems may involve scheduling (1) customers, (2) the workforce, and (3) equipment. Scheduling customers often takes the form of appointment systems or reservation systems.

Appointment Systems Appointment systems are intended to control the timing of customer arrivals in order to mini- mize customer waiting while achieving a high degree of capacity utilization. A doctor can use an appointment system to schedule patients’ office visits during the afternoon, leaving the mornings free for hospital duties. Similarly, an attorney can schedule client meetings around court appearances. Even with appointments, however, problems can still arise due to lack of punctuality on the part of patients or clients, no-shows, and the inability to completely control the length of contact time (e.g., a dentist might run into complications in filling a tooth and have to spend additional time with a patient, thus backing up later appointments). Some of this can be avoided by trying to match the time reserved for a patient or client with the spe- cific needs of that case rather than setting appointments at regular intervals. Even with the problems of late arrivals and no-shows, the appointment system is a tremendous improvement over random arrivals.

Reservation Systems Reservation systems are designed to enable service systems to formulate a fairly accurate estimate of the demand on the system for a given time period and to minimize customer disap- pointment generated by excessive waiting or inability to obtain service. Reservation systems are widely used by resorts, hotels and motels, restaurants, and some modes of transporta- tion (e.g., airlines, car rentals). In the case of restaurants, reservations enable management to spread out or group customers so that demand matches service capabilities. Late arrivals and no-shows can disrupt the system. One approach to the no-show problem is to use deci- sion theory (described in the supplement to Chapter 5). The problem also can be viewed as a single-period inventory problem, as described in Chapter 13.

Yield Management Many companies, especially in the travel and tourist industries, operate with fixed capacities. Examples include hotels and motels, which operate with a fixed number of rooms to rent each night; airlines, which operate with a fixed number of seats to sell on any given flight; and cruise lines, which operate with a fixed number of berths to sell for any given cruise. The number of rooms, seats, or berths can be thought of as perishable inventory. For example, unsold seats on a flight cannot be carried over to the next flight; they are lost. The same is true for hotel rooms and cruise berths. Of course that unsold inventory does not generate income, so companies with fixed capacities must develop strategies to deal with sales.

ste24102_ch16_688-729.indd 712ste24102_ch16_688-729.indd 712 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 713

Yield management is the application of pricing strategies to allocate capacity among various categories of demand with the goal of maximizing the revenue generated by the fixed capacity. Demand for fixed capacity usually consists of customers who make advance reservations and walk-ins. Customers who make advance reservations are typically price- sensitive, while walk-ins are often price-insensitive. Companies must decide on the percentage of their limited inventory to allocate to reservations, trading off lower revenue per unit for increased certainty of sales, and how much to allocate to walk-ins, where demand is less certain but revenue per unit is higher.

The ability to predict demand is critical to the success of yield manage- ment, so forecasting plays a key role in the process. Seasonal variations are generally important, so forecasts must incorporate seasonality and plans must also be somewhat flexible to allow for ever-present random variations.

Yield management  The application of pricing strategies to allocate capacity among various categories of demand.

The basic yield management concept is applicable to railroads as well as airlines. Yield management is multidisciplinary because it blends elements of marketing, operations, and financial management.

Robert L. Crandall Former CEO—American Airlines Before takeoff and after landing, you’ve probably noticed lots of people and various types of vehicles and equipment busily moving around on the ground outside with no apparent game plan, particularly at larger airports. Actually, all that activity is carefully orchestrated, and because the people involved are an important part of our team, I’d like to tell you what the hustle and bustle is all about.

When a flight lands and approaches the terminal, ramp personnel guide the aircraft to its parking position and after it comes to a stop, put chocks under its wheels. As soon as that’s been done, other work- ers hook up ground-based power and air conditioning. Electric power comes from what looks like a large, industrial-strength extension cord plugged into the lower portion of the nose section. Heated or cooled air goes into the cabin via the big yellow hoses that run from the airplane either to the terminal, in cities where we have central air-handling facili- ties or, in others, to mobile air-handling units.

On the airplane, meanwhile, flight attendants open the door and as pas- sengers begin deplaning, a mechanic squeezes past them to get a debriefing from the cockpit and check to see if any maintenance work must be done.

Once all deplaning passengers are off, the cabin cleaners go into high gear on most flights, cleaning our seatback pockets, tidying up the cabin, cleaning the lavatories, doing a light vacuuming, repositioning safety belts for each seat’s next occupant, and so forth. (A more thor- ough cleaning is done each night.)

Simultaneously, out on the ramp, our people are unloading baggage, freight, and mail from the airplane’s belly compartments and beginning the process of sorting by various categories and destinations. In addi- tion to the bags and cargo that have reached their destination, which must be delivered promptly to passengers and shippers, some must be transferred to other American or American Eagle flights, and still oth- ers must be transferred to other carriers. Complicating matters further,

READING Servicing Passenger Planes

baggage, freight, and mail are often handled in dif- ferent facilities on the airport property.

If a meal has been served or is planned for the outbound flight, catering trucks pull up to service the First Class and main cabin galleys. Another special truck services the lavatory holding tanks, and in the midst of all this, mechanics are dealing with any problems reported by the crew and doing their own walk-around inspections.

Once all that is complete, customers start to board the aircraft for its next flight and everything happens in reverse. Ground workers start loading baggage in the forward belly and freight and mail in the rear. Fuel trucks pull up to refuel most flights. The airplanes must be “watered” as well; fresh water is pumped aboard from either a water truck or servicing equipment built into the gate itself. During cold- weather months, deicing trucks add another element of ramp activity as they spray fluid on the airplane’s wings and fuselage.

Most of the work on the ramp is done by our own people, principally fleet-service personnel, but there are also various services, like cater- ing, which are performed by contractors.

All this simultaneous activity can create conflicts. Baggage carts unloading the forward hold can encroach on the ground space needed by the trucks catering the First Class cabin, for example, and fuelers perform their function in the space needed by those unloading freight and mail. The ramp crew chiefs are the conductors, orchestrating the entire production, overseeing the detail, and seeing to it that all gets done without mishap—and on time.

It’s a delicate balancing act, and although our customers rarely come in contact with the folks working on the ramp, they are an impor- tant part of a team that aims to serve every customer well and keep our operation running safely and on time.

Source: Robert L. Crandall, “Servicing Passenger Planes,” American Way, March 15, 1995.

ste24102_ch16_688-729.indd 713ste24102_ch16_688-729.indd 713 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

714 Chapter Sixteen Scheduling

Scheduling the Workforce Scheduling customers is demand management. Scheduling the workforce is capacity manage- ment. This approach works best when demand can be predicted with reasonable accuracy. This is often true for restaurants, theaters, rush-hour traffic, and similar instances that have repeating patterns of intensity of customer arrivals. Scheduling hospital personnel, police, and telephone operators for catalog sales, credit card companies, and mutual fund companies also comes under this heading. An additional consideration is the extent to which variations in customer demands can be met with workforce flexibility. Thus, capacity can be adjusted by having cross-trained workers who can be temporarily assigned to help out on bottleneck operations during periods of peak demand.

Various constraints can affect workforce scheduling flexibility, including legal, behavioral, technical—such as workers’ qualifications to perform certain operations—and budget constraints. Union or federal work rules and vacations can make scheduling more complicated.

Cyclical Scheduling In many services (e.g., hospitals, police departments, fire departments, restaurants, and super- markets) the scheduling requirements are fairly similar: Employees must be assigned to work shifts or time slots, and have days off, on a repeating or cyclical basis. Here is a method for determining both a schedule and the minimum number of workers needed.

Generally a basic work pattern is set (e.g., work five consecutive days, have two consecu- tive days off ), and a list of staffing needs for the schedule cycle (usually one week) is given. For example:

A fairly simple but effective approach for determining the minimum number of workers needed is the following: Begin by repeating the staff needs for worker 1. Then,

1. Make the first worker’s assignment such that the two days with the lowest need (i.e., lowest sum) are designated as days off. Here Monday–Tuesday has the two lowest consecutive requirements. Circle those days. (Note, in some instances, Sun–Mon might yield the two lowest days.) In case of a tie, pick the pair with the lowest adjacent requirement day to the left and day to the right. If there is still a tie, pick arbitrarily.

2. Subtract one from each day’s requirement, except for the circled days. Assign the next employee, again using the two lowest consecutive days as days off. Circle those days.

Day Mon Tue Wed Thu Fri Sat Sun

Staff needed 2 4 3 4 6 5 5

Day Mon Tue Wed Thu Fri Sat Sun

Staff needed 2 4 3 4 6 5 5 Worker 1 2 4 3 4 6 5 5

Day Mon Tue Wed Thu Fri Sat Sun

Staff needed 2 4 3 4 6 5 5

Worker 1 2 4 3 4 6 5 5

Worker 2 2 4 2 3 5 4 4

ste24102_ch16_688-729.indd 714ste24102_ch16_688-729.indd 714 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 715

3. Repeat the preceding step for each additional worker until all staffing requirements have been met. However, don’t subtract from a value of zero. Note the tie for worker 3: Mon– Tue and Sun–Mon have the lowest consecutive requirements, 4. The Mon–Tue two adjacents are Sun � 3 and Wed � 2, for a total of 5, which is less than the two adjacents for Sun–Mon (Sat � 3 and Tue � 3 for a total of 6). So circle Mon–Tue requirements for worker 3. Worker 4 also has a tie, and adjacents Sat and Tue total 5, whereas Tue–Fri adjacents total 6, so circle Sun–Mon requirements.

For Worker 7, circle Wed and Thu 0 0. To identify the days each worker is working, go across each worker’s row to find the

nonzero values that are not circled, signifying that the worker is assigned for those days. Similarly, to find the workers who are assigned to work for any particular day, go down that day’s column to find the nonzero values that are not circled. Note: Worker 6 will only work four days, and worker 7 will not work.

Scheduling Multiple Resources In some situations, it is necessary to coordinate the use of more than one resource. For exam- ple, hospitals must schedule surgeons, operating room staffs, recovery room staffs, admissions, special equipment, nursing staffs, and so on. Educational institutions must schedule faculty, classrooms, audiovisual equipment, and students. As you might guess, the greater the number of resources to be scheduled simultaneously, the greater the complexity and the less likely that an optimum schedule can be achieved. The problem is further complicated by the variable nature of such systems. For example, educational institutions frequently change their course offerings, student enrollments change, and students exhibit different course-selection patterns.

Some schools and hospitals are using computer software to assist them in devising acceptable schedules, although many appear to be using intuitive approaches with varying degrees of success.

Airlines are another example of service systems that require the scheduling of multiple resources. Flight crews, aircraft, baggage handling equipment, ticket counters, gate personnel, boarding ramps, and maintenance personnel all have to be coordinated. Furthermore, govern- ment regulations on the number of hours a pilot can spend flying place an additional restric- tion on the system. Another interesting variable is that, unlike most systems, the flight crews and the equipment do not remain in one location. Moreover, the crew and the equipment are not usually scheduled as a single unit. Flight crews are often scheduled so that they return to their base city every two days or more, and rest breaks must be considered. On the other hand, the aircraft may be in almost continuous use except for periodic maintenance and repairs. Consequently, flight crews commonly follow different trip patterns than that of the aircraft.

There are also other activities that must be scheduled, some of which are described by American Airlines Chairman Robert L. Crandall in the reading on servicing passenger planes.

Service systems are prone to slowdowns when variability in demand for services causes bottlenecks. Part of the difficulty lies in predicting which operations will become bottlenecks. Moreover, bottlenecks may shift with the passage of time, so that different operations become bottleneck operations—further complicating the problem.

Day Mon Tue Wed Thu Fri Sat Sun

Staff needed 2 4 3 4 6 5 5

Worker 1 2 4 3 4 6 5 5

Worker 2 2 4 2 3 5 4 4

Worker 3 1 3 2 3 4 3 3

Worker 4 1 3 1 2 3 2 2 (tie)

Worker 5 1 2 0 1 2 1 2

Worker 6 0 1 0 1 1 0 1 (multiple ties)

Worker 7 0 1 0 0 0 0 0

No. working: 2 4 3 4 6 5 5

ste24102_ch16_688-729.indd 715ste24102_ch16_688-729.indd 715 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

716 Chapter Sixteen Scheduling

16.4 OPERATIONS STRATEGY

Scheduling can either help or hinder operations strategy. If scheduling is done well, goods or services can be made or delivered in a timely manner. Resources can be used to best advan- tage and customers will be satisfied. Scheduling not performed well will result in inefficient use of resources and possibly dissatisfied customers.

The implication is clear: Management should not overlook the important role that schedul- ing plays in the success of an organization and the supply chain, giving a competitive advan- tage if done well or disadvantage if done poorly. Time-based competition depends on good scheduling. Coordination of materials, equipment use, and employee time is an important function of operations management. It is not enough to have good design, superior quality, and the other elements of a well-run organization if scheduling is done poorly—just as it is not enough to own a well-designed and well-made car, with all the latest features for comfort and safety, if the owner doesn’t know how to drive it!

1. Scheduling occurs in every business organization.

2. Scheduling decisions are made within constraints established by decisions on capacity, product or service design, process selection and layout, aggregate planning, and master scheduling.

3. Scheduling decisions occur just prior to the conversion of inputs into outputs.

4. Effective scheduling can reduce costs and increase productivity.

KEY POINTS

assignment model, 697 backward scheduling, 695 finite loading, 695 flow-shop scheduling, 690 flow system, 690 forward scheduling, 695 Gantt chart, 693 global priority rules, 700 Hungarian method, 697 infinite loading, 695

input/output (I/O) control, 696 job flow time, 701 job lateness, 701 job-shop scheduling, 693 job time, 700 Johnson’s rule, 707 load chart, 694 loading, 693 local priority rules, 700 makespan, 701

priority rules, 700 process batch, 711 schedule chart, 695 scheduling, 689 sequencing, 700 theory of constraints, 711 transfer batch, 711 workstation, 700 yield management, 713

KEY TERMS

Scheduling involves the timing and coordination of operations. Such activities are fundamental to virtu- ally every organization. Scheduling problems differ according to whether a system is designed for high volume, intermediate volume, or low volume. Scheduling problems are particularly complex for job shops (low volume) because of the variety of jobs these systems are required to process.

The two major problems in job-shop scheduling are assigning jobs to machines or work centers, and designating the sequence of job processing at a given machine or work center. Gantt load charts are frequently employed to help managers visualize workloads, and they are useful for describing and ana- lyzing sequencing alternatives. In addition, both heuristic and optimizing methods are used to develop loading and sequencing plans. For the most part, the optimization techniques can be used only if certain assumptions can be made.

Customer requirements in service systems generally present very different circumstances than those encountered in manufacturing systems. Some services can use appointments and reservations for sched- uling purposes, although not all systems are amenable to this. When multiple resources are involved, the task of balancing the system can be fairly complex.

SUMMARY

SOLVED PROBLEMS

The assignment method. The following table contains information on the cost to run three jobs on four available machines. Determine an assignment plan that will minimize costs.

Problem 1

ste24102_ch16_688-729.indd 716ste24102_ch16_688-729.indd 716 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 717

In order for us to be able to use the assignment method, the numbers of jobs and machines must be equal. To remedy this situation, add a dummy job with costs of 0, and then solve as usual.

MACHINE

A B C D

Job

1 12 16 14 10

2 9 8 13 7

3 15 12 9 11

(dummy) 4 0 0 0 0

Solution

MACHINE

A B C D

Job

1 12 16 14 10

2 9 8 13 7

3 15 12 9 11

a. Subtract the smallest number from each row. The results are

b. Subtract the smallest number in each column. (Because of the dummy zeros in each column, the resulting table will be unchanged.)

c. Determine the minimum number of lines needed to cross out the zeros. One possible way is

d. Because the number of lines is less than the number of rows, modify the numbers.

(1) Subtract the smallest uncovered number (1) from each uncovered number.

(2) Add the smallest uncovered number to numbers at line intersections. The result is

MACHINE

A B C D

Job

1 2 6 4 0

2 2 1 6 0

3 6 3 0 2

4 0 0 0 0

MACHINE

A B C D

Job

1 2 6 4 0 2 2 1 6 0

3 6 3 0 2

4 0 0 0 0

MACHINE

A B C D

Job

1 1 5 4 0

2 1 0 6 0

3 5 2 0 2

4 0 0 1 1

ste24102_ch16_688-729.indd 717ste24102_ch16_688-729.indd 717 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

718 Chapter Sixteen Scheduling

e. Test for optimality:

Because the minimum number of lines equals the number of rows, an optimum assignment can be made.

f. Assign jobs to machines. Start with rows 1 and 3, since they each have one zero, and columns A and C, also with one zero each. After each assignment, cross out all the numbers in that row and column. The result is

Notice that there is only one assignment in each row, and only one assignment in each column.

g. Compute total costs, referring to the original table

h. The implication of assignment 4-A is that machine A will not be assigned a job. It may remain idle or be used for another job.

MACHINE

A B C D

Job

1 1 5 4 0

2 1 0 6 0

3 5 2 0 2

4 0 0 1 1

MACHINE

A B C D

Job 1 1 5 4 0

2 1 0 6 0

3 5 2 0 2

4 0 0 1 1

1-D $10

2-B 8

3-C 9

4-A 0

$27

Problem 2 Priority rules. Job times (including processing and setup) are shown in the following table for five jobs waiting to be processed at a work center:

Determine the processing sequence that would result from each of these priority rules:

a. SPT b. EDD

Job Job Time (hours)

Due Date (hours)

a 12 15

b 6 24

c 14 20

d 3 8

e 7 6

ste24102_ch16_688-729.indd 718ste24102_ch16_688-729.indd 718 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 719

Assume job times are independent of processing sequence.

a. SPT b. EDD

Job Job

Time Processing

Order Hour Due

Processing Order

a 12 4 15 3

b 6 2 24 5

c 14 5 20 4

d 3 1 8 2

e 7 3 6 1

Solution

Problem 3 Priority rules. Using the job times and due dates from Solved Problem 2, determine each of the following performance measures for first-come, first-served processing order: Assume jobs listed in order of arrival.

a. Makespan.

b. Average flow time.

c. Average tardiness.

d. Average number of jobs at the workstation.

Job Job Time

Flow Time

Hour Due

Hours Tardy

a 12 12 15 0

b 6 18 24 0

c 14 32 20 12

d 3 35 8 27

e 7 42 6 36

Total 139 75

Solution

a. Makespan �   42 hours

b. Average flow time Total flow time

Number of jobs

139

5 27.80 hours

Average tardiness Total hours tardy

Number of jobs

75

5 15 hours

Average number of jobs at workstation

Total flow time

Makespan

139

42 3.31

� � �

� � �

� � �

c.

d.

Problem 4 S/O rule. Using the following information, determine an order processing sequence using the S/O priority rule.

Order

Processing Time

Remaining (days)

Due Date (days)

Number of Operations Remaining

A 20 30 2

B 11 18 5

C 10 6 2

D 16 23 4

ste24102_ch16_688-729.indd 719ste24102_ch16_688-729.indd 719 11/20/13 9:12 AM11/20/13 9:12 AM

Final PDF to printer

720 Chapter Sixteen Scheduling

Assume times are independent of processing sequence. Solution

Order

(1) Remaining Processing

Time

(2)

Due Date

(3)

(2) – (1) Slack

(4)

Number of Operations

(5)

Ratio

(6)

Rank (sequence)

A 20 30 10 2 5.00 4

B 11 18 7 5 1.40 2

C 10 6 � 4 2 � 2.00 1

D 16 23 7 4 1.75 3

(Note that one ratio is negative. When negatives occur, assign the lowest rank to the most negative number.)

Problem 5 Sequencing jobs through two work centers. Use Johnson’s rule to obtain the optimum sequence for processing the jobs shown through work centers A and B.

Job

JOB TIMES (hours)

Work Center A Work Center B

a 2.50 4.20

b 3.80 1.50

c 2.20 3.00

d 5.80 4.00

e 4.50 2.00

Solution a. Identify the smallest time: job b (1.50 hours at work center B). Because the time is for B, schedule this job last.

b. The next smallest time is job e (2.00 hours at B). Schedule job e next to last.

c. Identify the smallest remaining job time: job c (2.20 hours at center A). Since the time is in the A column, schedule job c first. At this point, we have:

c, _____, _____, e, b

d. The smallest time for the remaining jobs is 2.50 hours for job a at center A. Schedule this job after job c. The one remaining job (job d) fills the remaining slot. Thus, we have

c-a-d-e-b

Problem 6 For Solved Problem 5, determine what effect splitting jobs c, d, e, and b in work center A would have on the idle time of work center B and on the throughput time. Assume that each job can be split into two equal parts.

Solution We assume that the processing sequence remains unchanged and proceed on that basis. The solution from the previous problem is shown in the following chart. The next chart shows reduced idle time at center B when splitting is used.

2.200

2.200

B

A c

4.70 10.50 15.00 18.80

5.20 9.40 10.50 14.50 17.00 18.80 20.30

a

c

d

a

e b

d e b

2.200

1.100

B

A c

4.70 10.50 15.00 18.80

4.10 8.90 14.00 18.05 19.55

a

c

d

a

e b

d e b

7.60 12.751.10

16.0012.90

ste24102_ch16_688-729.indd 720ste24102_ch16_688-729.indd 720 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 721

1. Why is scheduling fairly simple for repetitive systems but fairly complex for job shops?

2. What are the main decision areas of job-shop scheduling?

3. What are Gantt charts? How are they used in scheduling? What are the advantages of using Gantt charts?

4. What are the basic assumptions of the assignment method of linear programming?

5. Briefly describe each of these priority rules:

a. FCFS b. SPT c. EDD d. S/O e. Rush

6. Why are priority rules needed?

7. What problems not generally found in manufacturing systems do service systems present in terms of scheduling the use of resources?

8. Explain forward and backward schedulings and each one’s advantage.

9. How are scheduling and productivity related?

10. What factors would you take into account in deciding whether to split a job?

11. Explain the term makespan.

DISCUSSION AND REVIEW QUESTIONS

1. One approach that can be effective in reducing the impact of production bottlenecks in a job shop or batch operations setting is to use smaller lot sizes.

a. What is the impact of a production bottleneck? b. Explain how small lot sizes can reduce the impact of bottleneck operations. c. What are the key trade-offs in using small lot sizes for the purpose of reducing the bottleneck

effect? d. In some cases, the location of a bottleneck will shift (i.e., sometimes it is at workstation 3,

another time it is at workstation 12). Furthermore, there can be more than one bottleneck operation at the same time. How would these situations impact scheduling using small lot sizes?

2. Doctors’ and dentists’ offices frequently schedule patient visits at regularly spaced intervals. What problems can this create? Can you suggest an alternative approach to reduce these prob- lems? Under what circumstances would regularly spaced appointments constitute a reasonable approach to patient scheduling?

3. Name three examples of unethical behavior involving scheduling and state the ethical principle each violates.

CRITICAL THINKING

EXERCISES

An inspection of these two figures reveals that throughput time has decreased from 20.30 hours to 19.55 hours. In addition, the original idle time was 5.6 hours. After splitting certain jobs, it was reduced to 4.85 hours, so some improvement was achieved. Note that processing times at B are gen- erally less than at A for jobs toward the end of the sequence. As a result, jobs such as e and b at B were scheduled so that they were centered around the finishing times of e and b, respectively, at A, to avoid having to break the jobs due to waiting for the remainder of the split job from A. Thus, the greatest advantage from job splitting generally comes from splitting earlier jobs when Johnson’s rule is used for sequencing.

1. What general trade-offs are involved in sequencing decisions? In scheduling decisions?

2. Who needs to be involved in setting schedules?

3. How has technology had an impact on scheduling?

TAKING STOCK

ste24102_ch16_688-729.indd 721ste24102_ch16_688-729.indd 721 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

722 Chapter Sixteen Scheduling

1. Use the assignment method to determine the best way to assign workers to jobs, given the following cost information. Compute the total cost for your assignment plan.

PROBLEMS

JOB

A B C

Worker

1 5 8 6

2 6 7 9

3 4 5 3

2. Rework Problem 1, treating the numbers in the table as profits instead of costs. Compute the total profit.

3. Assign trucks to delivery routes so that total costs are minimized, given the cost data shown. What is the total cost?

4. Develop an assignment plan that will minimize processing costs, given the information shown, and interpret your answer.

5. Use the assignment method to obtain a plan that will minimize the processing costs in the following table under these conditions: a. The combination 2-D is undesirable. b. The combinations 1-A and 2-D are undesirable.

6. The following table contains information concerning four jobs that are awaiting processing at a work center.

ROUTE

A B C D E

Truck

1 4 5 9 8 7

2 6 4 8 3 5

3 7 3 10 4 6

4 5 2 5 5 8

5 6 5 3 4 9

WORKER

A B C

Job

1 12 8 11

2 13 10 8

3 14 9 14

4 10 7 12

WORKER

A B C D E

Job

1 14 18 20 17 18

2 14 15 19 16 17

3 12 16 15 14 17

4 11 13 14 12 14

5 10 16 15 14 13

Job Job Time

(days) Due Date

(days)

A 14 20

B 10 16

C 7 15

D 6 17

ste24102_ch16_688-729.indd 722ste24102_ch16_688-729.indd 722 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 723

a. Sequence the jobs using (1) FCFS, (2) SPT, (3) EDD, and (4) CR. Assume the list is by order of arrival.

b. For each of the methods in part a, determine (1) the average job flow time, (2) the average tar- diness, and (3) the average number of jobs at the work center.

c. Is one method superior to the others? Explain. 7. Using the information presented in the following table, identify the processing sequence that

would result using (1) FCFS, (2) SPT, (3) EDD, and (4) CR. For each method, determine (1) average job flow time, (2) average job tardiness, and (3) average number of jobs in the system. Jobs are listed in order of arrival. ( Hint: First determine the total job time for each job by computing the total processing time for the job and then adding in the setup time. All times and due dates are in hours.)

8. The following table shows orders to be processed at a machine shop as of 8:00 a.m. Monday. The jobs have different operations they must go through. Processing times are in days. Jobs are listed in order of arrival.

a. Determine the processing sequence at the first work center using each of these rules: (1) FCFS, (2) S/O.

b. Compute the effectiveness of each rule using each of these measures: (1) average flow time, (2) average number of jobs at the work center.

9. A wholesale grocery distribution center uses a two-step process to fill orders. Tomorrow’s work will consist of filling the seven orders shown. Determine a job sequence that will minimize the time required to fill the orders.

10. The times required to complete each of eight jobs in a two-machine flow shop are shown in the table that follows. Each job must follow the same sequence, beginning with machine A and mov- ing to machine B.

a. Determine a sequence that will minimize makespan time. b. Construct a chart of the resulting sequence, and find machine B’s idle time.

Job

Processing Time

(days)

Due Date

(days)

Remaining Number of Operations

A 8 20 2

B 10 18 4

C 5 25 5

D 11 17 3

E 9 35 4

Job Processing

Time per Unit Units

per Job Setup Time

Due Date

a .14 45 0.7 4

b .25 14 0.5 10

c .10 18 0.2 12

d .25 40 1.0 20

e .10 75 0.5 15

Order

TIME (hours)

Step 1 Step 2

A 1.20 1.40

B 0.90 1.30

C 2.00 0.80

D 1.70 1.50

E 1.60 1.80

F 2.20 1.75

G 1.30 1.40

ste24102_ch16_688-729.indd 723ste24102_ch16_688-729.indd 723 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

724 Chapter Sixteen Scheduling

c. For the sequence determined in part a, how much would machine B’s idle time be reduced by splitting the last two jobs in half?

11. Given the operation times provided: a. Develop a job sequence that minimizes idle time at the two work centers. b. Construct a chart of the activities at the two centers, and determine each one’s idle time,

assuming no other activities are involved.

12. A shoe repair operation uses a two-step sequence that all jobs in a certain category follow. All jobs can be split in half at both stations. For the group of jobs listed, a. Find the sequence that will minimize total completion time. b. Determine the amount of idle time for workstation B. c. What jobs are candidates for splitting? Why? If they were split, how much would idle time and

makespan time be reduced?

13. The following schedule was prepared by the production manager of Marymount Metal Shop: Determine a schedule that will result in earliest completion of all jobs on this list.

14. The production manager must determine the processing sequence for seven jobs through the grinding and deburring departments. The same sequence will be followed in both departments. The manager’s goal is to move the jobs through the two departments as quickly as possible. The foreman of the deburring department wants the SPT rule to be used to minimize the work-in- process inventory in his department.

JOB TIMES (minutes)

A B C D E

Workstation A 27 18 70 26 15

Workstation B 45 33 30 24 10

JOB TIMES (minutes)

A B C D E F

Center 1 20 16 43 60 35 42

Center 2 27 30 51 12 28 24

Job

TIME (hours)

Machine A Machine B

a 16 5

b 3 13

c 9 6

d 8 7

e 2 14

f 12 4

g 18 14

h 20 11

Job

CUTTING POLISHING

Start Finish Start Finish

A 0 2 2 5

B 2 6 6 9

C 6 11 11 13

D 11 15 15 20

E 15 17 20 23

F 17 20 23 24

G 20 21 24 28

ste24102_ch16_688-729.indd 724ste24102_ch16_688-729.indd 724 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 725

a. Prepare a schedule using SPT for the grinding department. b. What is the flow time in the grinding department for the SPT sequence? What is the total time

needed to process the seven jobs in both the grinding and deburring departments? c. Determine a sequence that will minimize the total time needed to process the jobs in both

departments. What flow time will result for the grinding department? d. Discuss the trade-offs between the two alternative sequencing arrangements. At what point

would the production manager be indifferent concerning the choice of sequences? 15. A foreman has determined processing times at a work center for a set of jobs and now wants to

sequence them. Given the information shown, do the following: a. Determine the processing sequence using (1) FCFS, (2) SPT, (3) EDD, and (4) CR. For each

sequence, compute the average job tardiness, the average flow time, and the average number of jobs at the work center. The list is in FCFS order.

b. Using the results of your calculations in part a, show that the ratio of average flow time and the average number of jobs measures are equivalent for all four sequencing rules.

c. Determine the processing sequence that would result using the S/O rule.

16. Given the information in the following table, determine the processing sequence that would result using the S/O rule.

17. Given the following information on job times and due dates, determine the optimal processing sequence using (1) FCFS, (2) SPT, (3) EDD, and (4) CR. For each method, find the average job flow time and the average job tardiness. Jobs are listed in order of arrival.

Job

Remaining Processing Time (days)

Due Date

Remaining Number of Operations

a 5 8 2

b 6 5 4

c 9 10 4

d 7 12 3

e 8 10 2

Job

PROCESSING TIME (hours)

Grinding Deburring

A 3 6

B 2 4

C 1 5

D 4 3

E 9 4

F 8 7

G 6 2

Job Job Time

(days) Due Date

Operations Remaining

a 4.5 10 3

b 6.0 17 4

c 5.2 12 3

d 1.6 27 5

e 2.8 18 3

f 3.3 19 1

ste24102_ch16_688-729.indd 725ste24102_ch16_688-729.indd 725 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

726 Chapter Sixteen Scheduling

18. The Budd Gear Co. specializes in heat-treating gears for automobile companies. At 8:00 a.m., when Budd’s shop opened today, five orders (listed in order of arrival) were waiting to be processed.

a. If the earliest due date rule is used, what sequence should be used? b. What will be the average job tardiness? c. What will be the average number of jobs in the system? d. Would the SPT rule produce better results in terms of job tardiness?

19. The following table contains order-dependent setup times for three jobs. Which processing sequence will minimize the total setup time?

20. The following table contains order-dependent setup times for three jobs. Which processing sequence will minimize the total setup time?

21. The following table contains order-dependent setup times for four jobs. For safety reasons, job C cannot follow job A, nor can job A follow job C. Determine the processing sequence that will minimize the total setup time. ( Hint: There are 12 alternatives.)

Job Job Time (hours)

Due Date (hours)

a 3.5 7

b 2.0 6

c 4.5 18

d 5.0 22

e 2.5 4

f 6.0 20

Order Order Size

(units)

Per Unit Time in Heat Treatment (minutes/unit)

Due Date (min. from now)

A 16 4 160

B 6 12 200

C 10 3 180

D 8 10 190

E 4 1 220

Following Job’s Setup Time (hrs.)

Setup Time (hrs.) A B C

Preceding Job

A 2 — 3 5

B 3 8 — 2 C 2 4 3 —

Following Job’s Setup Time (hrs.)

Setup Time (hrs.) A B C

Preceding Job

A 2.4 — 1.8 2.2 B 3.2 0.8 — 1.4 C 2.0 2.6 1.3 —

ste24102_ch16_688-729.indd 726ste24102_ch16_688-729.indd 726 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

Chapter Sixteen Scheduling 727

22. Given this information on planned and actual inputs and outputs for a service center, determine the work backlog for each period. The beginning backlog is 12 hours of work. The figures shown are standard hours of work.

23. Given the following data on inputs and outputs at a work center, determine the cumulative devia- tion and the backlog for each time period. The beginning backlog is 7.

24. Determine the minimum number of workers needed, and a schedule for the following staffing requirements, giving workers two consecutive days off per cycle (not including Sunday).

25. Determine the minimum number of workers needed, and a schedule for the following staffing requirements, giving workers two consecutive days off per cycle (not including Sunday).

26. Determine the minimum number of workers needed, and a schedule for the following staffing requirements, giving workers two consecutive days off per cycle (not including Sunday).

Following Job’s Setup Time (hrs.)

Setup Time (hrs.) A B C D

Preceding Job

A 2 — 5 x 4 B 1 7 — 3 2 C 3 x 2 — 2 D 2 4 3 6 —

PERIOD

1 2 3 4 5 6

Output Planned 200 200 180 190 190 200

Actual 205 194 177 195 193 200

PERIOD

1 2 3 4 5 6

Input Planned 200 200 180 190 190 200 Actual 210 200 179 195 193 194

Day Mon Tue Wed Thu Fri Sat

Staff needed 2 3 1 2 4 3

PERIOD

1 2 3 4 5

Input Planned 24 24 24 24 20

Actual 25 27 20 22 24

Output Planned 24 24 24 24 23

Actual 24 22 23 24 24

Day Mon Tue Wed Thu Fri Sat

Staff needed 4 4 5 6 7 8

Day Mon Tue Wed Thu Fri Sat

Staff needed 3 4 2 3 4 5

ste24102_ch16_688-729.indd 727ste24102_ch16_688-729.indd 727 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

728

It was a little past 9:00 on a Monday morning when Jeff Baker walked into your office with a box of donuts.

“I’ve been talking with Anne about a problem we have with short- term capacity in our pad printing operation. You know, that’s where we print the logo on the Custom lines of yo-yos. We have received more orders than usual for July, and I want to release the orders to pad print- ing in a way that will enable us to meet our due date commitments in the best way possible. Would you have time to look at the order list (attached) and see what kind of schedule we should follow to do that? By the way, you have established quite a reputation in your short stay here. You have a talent for really explaining why your recommendations are the best approach in a way that all of us ‘over-the-hill’ managers can understand. Please be sure to do that for me, too. I want to understand why your recommendation is the best schedule and what the trade-offs are for other possible schedules—and none of that philosophical col- lege mumbo-jumbo. Remember, I came up through the ranks. I don’t have one of those sheepskins on my wall,” he says with a laugh.

Since your schedule was back to normal after that MRP report you did for Anne, you agreed to look at the information. After that compli- ment, how could you say no? “Try to get back to me within a couple of days,” Jeff said as he left your office.

After a few minutes with your old operations management text, you call the production control office to confirm the pad printing schedule. They confirm that pad printing runs one eight-hour shift per day. They tell you that due to a make-up day for flooding in June, pad printing will be running 23 days in July, beginning Friday, July 1 (they will work three Saturdays on July 9, 16, and 23, and take a one-day holiday for July 4).

You thank them for the information and then you begin to develop your plan.

Even though Jeff lacks a college degree, from what you have seen, he is very sharp. And obviously he knows good work when he sees it since he liked, and apparently understood, your past work. You resolve to cover all the bases but in a way that is as clear as possible.

Note: Setup time is to set up the pad printer at the start of the job. Setup includes thoroughly cleaning the printing heads and ink reser- voirs, installing the new pad(s) and ink supply, and carefully aligning the machine. Setup at the beginning of a new day with the same job is insignificant.

Examine the following rules and write a report to Jeff Baker summa- rizing your findings and advise him on which rule to use. Rules: FCFS, SPT, EDD, and CR.

Source: Victor E. Sower, “Hi-Ho, Yo-Yo, Inc.” Copyright © 2006 Victor E. Sower, Ph.D, C.D.E.

CASE Hi-Ho, Yo-Yo, Inc.

Goldratt, Eli, and Jeff Cox. The Goal: A Process of Ongoing Improvement. 3rd ed. Great Barrington, MA: North River Press, 2012.

Hopp, Wallace J., and Mark L. Spearman. Factory Physics. 3rd ed. New York: Irwin/McGraw-Hill, 2007.

Jacobs, F. Robert, William L. Berry, D. Clay Whybark, and Thomas E.Vollmann. Manufacturing Planning and Control Systems. 6th ed. New York: Irwin/ McGraw-Hill, 2011.

Pinedo, Michael. Planning and Scheduling in Manufac- turing and Services. New York: Springer, 2005.

SELECTED BIBLIOGRAPHY AND FURTHER READINGS

PAD PRINTING ORDER LIST

Job Date Order Received

Setup Time

Production Time

Due Date1

A 6/4 2 hrs. 6 days 11 July

B 6/7 4 hrs. 2 days 8 July

C 6/12 2 hrs. 8 days 25 July

D 6/14 4 hrs. 3 days 19 July

E 6/15 4 hrs. 9 days 29 July 1Jobs are due at the beginning of their respective due dates.

ste24102_ch16_688-729.indd 728ste24102_ch16_688-729.indd 728 11/19/13 2:06 PM11/19/13 2:06 PM

Final PDF to printer

This page intentionally left blank

730

C H A P T E R

17 Project Management CHAPTER OUTLINE

17.1 Introduction, 732

17.2 Project Life Cycle, 732

17.3 Behavioral Aspects of Project Management, 733 The Nature of Projects, 734

Key Decisions in Project Management, 735

The Project Manager, 736

Behavioral Issues, 737

Project Champions, 737

Certification, 738

The Pros and Cons of Working on Projects, 738

17.4 Work Breakdown Structure, 739

17.5 Planning and Scheduling with Gantt Charts, 739

17.6 PERT and CPM, 740 The Network Diagram, 740

Network Conventions, 742

17.7 Deterministic Time Estimates, 743

17.8 A Computing Algorithm, 744 Activity-on-Arrow, 744

Activity-on-Node, 748

Computing Slack Times, 750

17.9 Probabilistic Time Estimates, 751

17.10 Determining Path Probabilities, 754

17.11 Simulation, 756

17.12 Budget Control, 757

17.13 Time–Cost Trade-Offs: Crashing, 757

17.14 Advantages of Using PERT and Potential Sources of Error, 760

17.15 Critical Chain Project Management, 761

17.16 Other Topics in Project Management, 761

17.17 Project Management Software, 762

17.18 Operations Strategy, 763

17.19 Risk Management, 763

Cases: The Case of the Mexican Crazy Quilt, 779 Time, Please, 781

LEARNING OBJECTIVES After completing this chapter, you should be able to:

LO17.1 Describe the project life cycle.

LO17.2 Discuss the behavioral aspects of projects in terms of project personnel and the project manager.

LO17.3 Name the six key decisions in project management.

LO17.4 Explain the nature and importance of a work breakdown structure in project management.

LO17.5 Give a general description of PERT/CPM techniques.

LO17.6 Construct simple network diagrams.

LO17.7 Analyze networks with deterministic times.

LO17.8 Analyze networks with probabilistic times.

LO17.9 Describe activity “crashing” and solve typical problems.

LO17.10 Discuss the advantages of using PERT and potential sources of error.

LO17.11 Discuss the key steps in risk management.

ste24102_ch17_730-781.indd 730ste24102_ch17_730-781.indd 730 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

731

Projects are a unique aspect of business operations that require a special management approach. Unlike many other aspects of business, which tend to operate more routinely, projects often have uncertainties and risks that tend to make managing them more challenging, such as the Hoover Dam bridge.

Examples of projects are many. Some are huge, such as building the space station, rescue and cleanup operations after major natural disasters, and hosting the Olympic games. Others are smaller in scope, but still quite involved, such as producing a major motion picture, putting on a Broadway play, or producing a music video. They involve a tremendous amount of planning and coordinating set design, set building, script writing, camera crews, directors, actors or hosts, costumes, advertising, and more to accomplish project objectives while meeting budget and time constraints.

Consider the Olympic Games. They involve much more than the festivities, the excitement, national pride, and competition among athletes. They all involve a tremendous amount of planning, preparation, and coordinating work that needs to get done before and during the games. Athletes’ living quarters and training facilities must be provided, competition schedules must be developed, arrangements for televising events must be made, equipment and crews must be coordinated, transportation and hotel accommodations must be made, and many other activities that go on behind the scenes must be planned and managed so that everything goes off smoothly.

The Microsoft Corporation periodically releases new or updated software. Each release is the result of many people working countless hours writing code, testing programs, and revising code. Design, production, and marketing efforts also have to be coordinated. The reputation and profits of the company are closely related to successful software development.

Not all projects are successful, and the consequences of project failure can be costly, and even catastrophic. ERP installation projects (see Chapter 12) are expensive and time-consuming, and more than a few companies have terminated their projects after spending large sums of money.

This chapter introduces the basic concepts of project management. It includes a discussion of some behavioral aspects of project management, along with some of the difficulties project managers are apt to encounter. The main portion of the chapter is devoted to a description of graphical and computational methods that are used for planning and scheduling projects.

ste24102_ch17_730-781.indd 731ste24102_ch17_730-781.indd 731 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

732 Chapter Seventeen Project Management

17.1 INTRODUCTION Managers typically oversee a variety of operations. Some of these involve routine, repeti- tive activities, but others involve nonroutine activities. Under the latter heading are projects : unique, one-time operations designed to accomplish a set of objectives in a limited time frame. Other examples of projects include constructing a shopping complex, merging two companies, putting on a play, and designing and running a political campaign. Examples of projects within business organizations include designing new products or services, designing advertising campaigns, designing information systems, reengineering a process, designing databases, software development, and designing Web pages.

Projects may involve considerable cost. Some have a long time horizon, and some involve a large number of activities that must be carefully planned and coordinated. Most are expected to be completed based on time, cost, and performance targets. To accomplish this, goals must be established and priorities set. Tasks must be identified and time estimates made. Resource requirements also must be projected and budgets prepared. Once under way, progress must be monitored to assure that project goals and objectives will be achieved.

The project approach enables an organization to focus attention and concentrate efforts on accomplishing a narrow set of performance objectives within a limited time and budget framework. This can produce significant benefits compared with other approaches that might be considered. Even so, projects present managers with a host of problems that differ in many respects from those encountered with more routine activities. The problems of planning and coordinating project activities can be formidable for large projects, which typically have thou- sands of activities that must be carefully planned and monitored if the project is to proceed according to schedule and at a reasonable cost.

Projects can have strategic importance for organizations. For example, good project man- agement can be instrumental in successfully implementing an enterprise resource planning (ERP) system or converting a traditional operation to a lean operation. And good project man- agement is very important when virtual teams are used.

Table 17.1 provides an overview of project management.

17.2 PROJECT LIFE CYCLE The size, length, and scope of projects vary widely according to the nature and purpose of the project. Nevertheless, all projects have something in common: They go through a life cycle, which typically consists of five phases.

1. Initiating. This begins the process by outlining the expected costs, benefits, and risks associated with a project. It includes defining the major project goals and choosing a project manager

2. Planning. This phase provides details on deliverables, the scope of the project, the budget, the schedule and milestones, performance objectives, resources needed, a quality plan, and a plan for handling risks. The accompanying documents generated in the planning phase will be used in the executing and monitoring phases to guide activities and monitor progress. Members of the project team are chosen.

3. Executing. In this phase the actual work of the project is carried out. The project is managed as activities are completed, resources are consumed, and milestones are reached. Management involves what the Project Management Institute ( www.pmi.org ) refers to as the nine management areas: project integration, scope, human resources, communications, time, risk, quality, cost, and procurement.

4. Monitoring and Controlling. This phase occurs at the same time as project execution. It involves comparing actual progress with planned progress and undertakes corrective action if needed, and monitoring any corrective action to make sure it achieves the desired effect.

Projects  Unique, one-time operations designed to accom- plish a specific set of objectives in a limited time frame.

LO17.1 Describe the project life cycle.

ste24102_ch17_730-781.indd 732ste24102_ch17_730-781.indd 732 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

Chapter Seventeen Project Management 733

What is project management? A team-based approach for managing projects. How is it different from general operations management?

1. Limited time frame. 2. Narrow focus, specific objectives. 3. Less bureaucratic.

Why is it used?

1. Special needs that don’t lend themselves to functional management. 2. Pressures for new or improved products or services, cost reduction.

What are the key metrics?

1. Time. 2. Cost. 3. Performance objectives.

What are the key success factors?

1. Top-down commitment. 2. A respected and capable project manager. 3. Enough time to plan. 4. Careful tracking and control. 5. Good communications.

What are the major administrative issues?

1. Executive responsibilities: a. Project selection. b. Selection of a project manager. c. Organizational structure. (To whom will the project manager report?)

2. Organizational alternatives: a. Manage within functional unit. b. Assign a coordinator. c. Use a matrix organization with a project leader.

What are the main tools?

1. Work breakdown structure. An initial planning tool that is needed to develop a list of activities, activity sequences, and a realistic budget.

2. Network diagram. A “big picture” visual aid that is used to estimate project duration, identify activities that are critical for timely project completion, identify areas where slack time exists, and develop activity schedules.

3. Gantt charts. A visual aid used to plan and monitor individual activities. 4. Risk management. Analyses of potential failures or problems, assessment of their likelihood and conse-

quences, and contingency plans.

TABLE 17.1 Overview of project management

Closing. This phase ends the project. It involves handing off the project deliverables, obtaining customer acceptance, documenting lessons learned, and releasing resources.

It should be noted that the phases can overlap, so that one phase may not be fully complete before the next phase begins. This can reduce the time necessary to move through the life cycle, perhaps generating some competitive advantage and cost saving. Although subsequent decisions in an earlier phase may result in waste for some portion of the activity in a following phase, careful coordination of activities can minimize that risk.

Figure 17.1 illustrates the phases in a project life cycle.

17.3 BEHAVIORAL ASPECTS OF PROJECT MANAGEMENT Project management differs from management of more traditional activities mainly because of its limited time framework and the unique set of activities involved, which gives rise to a host of unique problems. This section describes more fully the nature of projects and their behavioral implications. Special attention is given to the role of the project manager.

LO17.2 Discuss the behavioral aspects of projects in terms of project personnel and the project manager.

ste24102_ch17_730-781.indd 733ste24102_ch17_730-781.indd 733 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

734 Chapter Seventeen Project Management

The Nature of Projects As projects go through their life cycle, a variety of skill requirements are involved. The circumstances are analogous to constructing a house. Initially an idea is presented and its feasibility is assessed, then plans must be drawn up and approved by the owner and pos- sibly a town building commission or other regulatory agency. Then a succession of activi- ties occurs, each with its own skill requirements, starting with the site preparation, then laying the foundation, erecting the frame, roofing, constructing exterior walls, wiring and plumbing, installing kitchen and bathroom fixtures and appliances, interior finishing work, and painting and carpeting work. Similar sequences occur on large construction projects, in R&D work, in the aerospace industry, and in virtually every other instance where projects are being carried out.

Projects typically bring together people with diverse knowledge and skills, most of whom remain associated with the project for less than its full life. Some people go from project to project as their contributions become needed, and others are “on loan,” either on a full-time or part-time basis, from their regular jobs. The latter is usually the case when a special project exists within the framework of a more traditional organization. However, some organizations are involved with projects on a regular basis; examples include consulting firms, architects, writers and publishers, and construction firms. In those organizations, it is not uncommon for some individuals to spend virtually all of their time on projects.

Some organizations use a matrix organization that allows them to integrate the activities of a variety of specialists within a functional framework. For instance, they have certain people who prepare proposals, others who concentrate exclusively on engineering, others who devote their efforts to marketing, and so on.

In a matrix organization, functional and project managers share workers and facilities. Project managers negotiate with functional managers for people to work on a project. Those selected will be temporarily assigned to the project manager. However, they are still respon- sible to their functional manager. They may work part-time or full-time on the project. When their work is done, they return to their functional department.

A matrix organization works quite well with people who can function with two managers. It can create synergy when people from various functional areas are brought together to work on a project. However, some people do not function well under such a structure, and may be stressed working in that environment. Matrix organizations typically do not allow long-term working relationships to develop. Furthermore, using multiple managers for one employee may result in uncertainty regarding employee evaluation and accountability.

FIGURE 17.1 Project life cycle

Source:  Adapted from Clifford F. Gray and Erik W. Larson, Project Management: The Managerial Process, 2nd ed., p. 6. Copyright © 2003 McGraw-Hill Companies, Inc. Used with permission.

Initiating

Goals Specifications Feasibility Tasks Responsibilities

Schedules Budgets Resources Risks Staffing

Status reports Changes Quality Manage Monitor and control

Train customer Transfer documents Release resources Reassign staff Lessons learned

Le ve

l o f

ef fo

rt

Planning Execution and

Monitoring and Controlling Closing

ste24102_ch17_730-781.indd 734ste24102_ch17_730-781.indd 734 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

Chapter Seventeen Project Management 735

Key Decisions in Project Management Much of the success of projects depends on key managerial decisions over a sequence of steps:

• Deciding which projects to implement.

• Selecting the project manager.

• Selecting the project team.

• Planning and designing the project.

• Managing and controlling project resources.

• Deciding if and when a project should be terminated.

Deciding Which Projects to Implement. This involves determining the criteria that will be used to decide which projects to pursue. Typical factors include budget, availability of appropriate knowledge and skill personnel, and cost–benefit considerations. Of course, other factors may override these criteria, factors such as availability of funds, safety issues, government-mandated actions, and so on.

Selecting the Project Manager. The project manager is the central person in the project. The following section on project managers discusses this topic.

Selecting the Project Team. The team can greatly influence the ultimate success or fail- ure of a project. Important considerations include not only a person’s knowledge and skill base, but also how well the person works with others (particularly those who have already been chosen for the project), enthusiasm for the project, other projects the person is involved in, and how likely those other projects might be to interfere with work on this project.

Planning and Designing the Project. Project planning and design require decisions on project performance goals, a timetable for project completion, the scope of the project, what work needs to be done, how it will be done, if some portions will be outsourced, what resources will be needed, a budget, and when and how long resources will be needed.

Managing and Controlling Project Resources. This involves managing personnel, equipment, and the budget; establishing appropriate metrics for evaluating the project; moni- toring progress; and taking corrective action when needed. Also necessary are designing an

LO17.3 Name the six key decisions in project management.

The U2 360 Tour was named after the 360-degree staging and audience configuration it used for shows. To accommodate this, the stage set made use of a massive four-legged supporting rig that was nicknamed “The Claw.” The tour crew consisted of 137 touring crews supplemented by over 120 hired locally. Moving the massive set from venues took as long as 3½ days. First, sound and light equipment was packed into the fleet of trucks during the four hours following the concert; the remainder of the time was spent deconstructing the steel structures.

ste24102_ch17_730-781.indd 735ste24102_ch17_730-781.indd 735 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

736 Chapter Seventeen Project Management

information system and deciding what project documents should be generated, their contents and format, when and by whom they will be needed, and how often they should be updated.

Deciding If and When a Project Should Be Terminated. Sometimes it is better to ter- minate a project than to invest any more resources. Important considerations here are the like- lihood of success, termination costs, and whether resources could be better used elsewhere.

The Project Manager The project manager has many duties. In the planning stage, the project manager must prepare a scope statement that spells out the deliverables and goals, determine required skills and resources needed, develop a schedule and budget, and develop plans for managing the scope, the schedule, the budget, and quality and risk.

The project manager bears the ultimate responsibility for the success or failure of the proj- ect. He or she must be capable of working through others to accomplish the objectives of the project. The project manager is responsible for effectively managing each of the following:

1. The work, so that all of the necessary activities are accomplished in the desired sequence, and performance goals are met.

2. The human resources, so that those working on the project have direction and motivation.

3. Communications, so that everybody has the information needed to do the work.

4. Quality, so that performance objectives are realized.

5. Time, so that the project is completed on schedule.

6. Costs, so that the project is completed within budget.

7. Scope, so the project stays within the prescribed scope, and “scope creep” doesn’t occur without commensurate changes to the schedule (if needed) and the budget.

Several of these responsibilities are often portrayed in what is known as a “project manage- ment triangle.”

To effectively manage a project, a project manager must employ a certain set of skills. The skills include the ability to motivate and direct team members; make trade-off decisions; expedite the work when necessary; put out fires; and moni- tor time, budget, and technical details. For projects that involve fairly well-defined work, those skills will often suffice. However, for projects that are less well defined, and thus have a higher degree of uncertainty, the project manager also must employ strong leadership skills. These include the ability to adapt to changing circum- stances that may involve changes to project goals, technical requirements, and proj- ect team composition. As a leader, the project manager not only must be able to deal with these issues; he or she also must recognize the need for change, decide what changes are necessary, and work to accomplish them.

The job of project manager can be both difficult and rewarding. The manager must coordinate and motivate people who sometimes owe their allegiance to other managers in their functional areas. In addition, the people who work on a project frequently possess specialized knowledge and skills that the project manager lacks.

Nevertheless, the manager is expected to guide and evaluate their efforts. Project managers often must function in an environment that is beset with uncertainties. Even so, budgets and time constraints are usually imposed, which can create additional pressures on project per- sonnel. Finally, the project manager may not have the authority needed to accomplish all the objectives of the project. Instead, the manager sometimes must rely on persuasion and the cooperation of others to realize project goals.

Ethical issues often arise in connection with projects. Examples include the temptation to understate costs or to withhold information in order to get a project approved, pressure to alter or make misleading statements on status reports, falsifying records, compromising work- ers’ safety, and approving substandard work. It is the responsibility of managers at all levels to maintain and enforce ethical standards. Moreover, employees often take their cue from

The Project Management Triangle

Performance Objectives

Schedule

Quality

Co st

ste24102_ch17_730-781.indd 736ste24102_ch17_730-781.indd 736 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

Chapter Seventeen Project Management 737

managers’ behavior, so it is doubly important for managers to model ethical behavior. The Project Management Institute (PMI) has a Web site ( www.pmi.org ) that includes a code of ethics for project managers, in addition to other useful information about project management.

The position of project manager has high visibility. The rewards of the job of project man- ager come from the creative challenges of the job, the benefits of being associated with a successful project (including promotion and monetary compensation), and the personal satis- faction of seeing it through to its conclusion.

Behavioral Issues Project metrics related to cost, schedule, and quality are important indicators of how well a project is doing. Behavioral metrics are also important, and should not be overlooked. People make the project happen. However, behavioral issues can interfere with the success of a project if they are not carefully managed. Decentralized decision making, the stress of achieving project milestones on time and within budget, and surprises can contribute to behavioral problems.

Because project work is often based on team efforts, workers are usually evaluated on the basis of the team’s overall contribution relative to project metrics, and not on an individual basis. The team must be able to function as a unit, so interpersonal skills are very important, as are coping skills. And conflict resolution can be an important part of a project manager’s job. Some problems can be avoided by the project manager by carefully selecting team mem- bers when possible; leadership; motivation; maintaining an environment of integrity, trust, and professionalism; and being supportive of team efforts.

Project Champions Some companies make use of project champions . These are people, usually within the com- pany, who promote and support the project. They can be instrumental in facilitating the work of the project manager by “talking up” the project to other managers who might be asked to share resources with the project team as well as employees who might be asked to work on parts of the project. The work that a project champion does can be critical to the success of a project, so it is important for team members to encourage and communicate with the project champion.

Project champion  A person who promotes and supports a project.

and inexpensively and boasts the advanced com- munication skills necessary to work closely with vendors, project teams and senior management.”

Project managers have always had to deal with changing relationships. The big change, according to Gispan, is the speed of change, which has made the project manager’s job more difficult. “The changes taking place now are faster and more dramatic than in the past,” he says. “Customers are less inclined to give you money for development work, for example. They’d rather save money by using off-the-shelf capabilities. Budgets that used to be reasonably substantial and healthy are now tight.”

Gispan adds that corporate mergers and consolidations have complicated the picture. Project managers must deal with complex, often labyrinthine decision-making structures. Getting quick decisions requires work and persistence.

Further complicating the situation is a high worker attrition rate. “A decade ago, the attrition rate was about 3 percent; today it has jumped to almost 10 percent,” Gispan explains. “It means project managers have to constantly put together new teams.”

Bob Weinstein Not many people can eloquently describe the changing role of project managers as well as Jonathan Gispan, who teaches the skill to man- agers at the Lockheed Martin Corporation division in King of Prussia, PA. Gispan spent 38 years of his career working at GE Aerospace as a project manager.

Project managers have never been more critical, according to this vet- eran techie. The function’s core responsibilities haven’t changed, but the players and playing field are very different than they were five years ago.

Gispan views the project manager as the focal point of a complex relationship matrix that includes customers, workers, vendors and bosses. “Project managers make things happen,” he says. “Not only do they manage a project from start to finish, they also manage the people who make it happen.”

The job requires a jack-of-all-trades who can both understand a problem and solve it. “Project managers must successfully manage the total lifecycle of a project,” says Gispan. “The job requires a super- organized person who knows how to get a project completed quickly

READING Project Managers Have Never Been More Critical

m- th

(continued)

ste24102_ch17_730-781.indd 737ste24102_ch17_730-781.indd 737 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

738 Chapter Seventeen Project Management

Certification The Project Management Institute (PMI) administers a globally recognized, examination- based professional certification program. The certification program maintains ISO 9001 cer- tification in Quality Management Systems. There are two levels of certification: Associate and Project Management Professional. Candidates for the Associate and Professional levels must meet specific education and experience requirements and agree to adhere to a code of professional conduct. The Project Management Professional must demonstrate an ongoing professional commitment to the field of project management by satisfying PMI’s Continuing Certification Requirements Program. 1

The Pros and Cons of Working on Projects People are selected to work on special projects because the knowledge or abilities they pos- sess are needed. In some instances, however, their supervisors may be reluctant to allow them to interrupt their regular jobs, even on a part-time basis, because it may require training a new person to do a job that will be temporary. Moreover, managers don’t want to lose the output of good workers. The workers themselves are not always eager to participate in projects because it may mean working for two bosses who impose differing demands, it may disrupt friendships and daily routines, and it presents the risk of being replaced on the current job. Furthermore, there may be fear of being associated with an unsuccessful project because of the adverse effect it might have on career advancement. In too many instances, when a major project is phased out and the project team disbanded, team members tend to drift away from the organization for lack of a new project and the difficulty of returning to former jobs. This tendency is more pronounced after lengthy projects and is less likely to occur when a team member works on a part-time basis.

In spite of the potential risks, people are attracted by the potential rewards of being involved in a project. One is the dynamic environment that surrounds a project, often a marked contrast to the staid environment of a routine in which some may feel trapped. Some individuals seem to thrive in more dynamic environments; they welcome the challenge of working under pres- sure and solving new problems. Then, too, projects may present opportunities to meet new people and to increase future job opportunities, especially if the project is successful. In addi- tion, association with a project can be a source of status among fellow workers. Finally, work- ing on projects frequently inspires a team spirit, increasing morale and motivation to achieve successful completion of project goals.

1 www.pmi.org .

Through it all, the project manager must be clear-headed and keep a tight rein on projects. It sounds intimidating, yet Gispan sees it as a positive. “The current marketplace keeps you on your toes,” he says. “Even though everything is changing at what seems like an overwhelm- ing pace, it is best to view change as a motivator that allows you to keep pace with technology and get better at your job. The idea is not merely to cope with change but to thrive in it. It is more of an attitude than anything else.”

What does it take to be a project manager? “You need a good tech- nical base,” says Karen Nichols, project manager at EWP Engineering, Inc., a consulting engineering company in Salt Lake City, UT. “That translates to at least five to seven years in the trenches.”

That’s for starters. “But you also need to know how the business side of the equation works,” says Nichols. “This is tough for some technical people because it requires the ability to understand how the two different sides of the business mesh. Project managers must also be familiar with accounting methods as well as sales and marketing strategies. In short, they must know how to manage a project so it makes a profit.”

If you think you have what it takes, ask to work with a project man- ager. “It won’t take you long to find out whether you have an aptitude and natural feel for the work,” says Nichols. “Not everyone is happy—or capable of—juggling many balls in the air at once.”

Once you get your feet wet, you can move up quickly, adds Gis- pan. “After you’ve proven to management that you’re organized and can manage several tasks, it won’t be long before you are managing everything associated with a program. Get good at it and you’ll move up the ranks from project manager to general manager where you are running several company businesses.”

And, don’t be confused by job titles. Each company has its own unique title for the project manager role. Whatever the title, a project manager is easy to spot. “It’s the person who negotiates with all the key players and makes things happen,” says Gispan. “Technology compa- nies would perish without them.”

Source: Bob Weinstein, “Project Managers Have Never Been More Critical,” Rochester Democrat and Chronicle, February 18, 1999. Copyright © 1999 Rochester Democrat and Chronicle. Reprinted by permission.

ste24102_ch17_730-781.indd 738ste24102_ch17_730-781.indd 738 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

Chapter Seventeen Project Management 739

17.4 WORK BREAKDOWN STRUCTURE Because large projects usually involve a very large number of activities, planners need some way to determine exactly what will need to be done so that they can realistically estimate how long it will take to complete the various elements of the project and how much it will cost. They often accomplish this by developing a work breakdown structure (WBS) , which is a hierarchical listing of what must be done during the project. This methodology establishes a logical framework for identifying the required activities for the project (see Figure 17.2 ). The first step in developing the work breakdown structure is to identify the major elements of the project. These are the Level 2 boxes in Figure 17.2 . The next step is to identify the major sup- porting activities for each of the major elements—the Level 3 boxes. Then, each major support- ing activity is broken down into a list of the activities that will be needed to accomplish it—the Level 4 boxes. (For purposes of illustration, only a portion of the Level 4 boxes are shown.) Usually there are many activities in the Level 4 lists. Large projects involve additional levels, but Figure 17.2 gives you some idea of the concept of the work breakdown structure.

Developing a good work breakdown structure can require substantial time and effort due to the uncertainties associated with a project and/or the size of the project. Typically the por- tion of time spent on developing the work breakdown structure greatly exceeds the time spent on actually developing a project schedule. The importance of a work breakdown structure is underscored by the fact that the activity list that results serves as the focal point for planning and doing the project. Moreover, the work breakdown structure is the basis for developing time and cost estimates.

17.5 PLANNING AND SCHEDULING WITH GANTT CHARTS The Gantt chart (see Chapter 16) is a popular visual tool for planning and scheduling simple projects. It enables a manager to initially schedule project activities and then to monitor prog- ress over time by comparing planned progress to actual progress. Figure 17.3 illustrates a Gantt chart for a bank’s plan to establish a new direct marketing department. To prepare the chart, the vice president in charge of the project had to first identify the major activities that would be required. Next, time estimates for each activity were made, and the sequence of activities was determined. Once completed, the chart indicated which activities were to occur, their planned duration, and when they were to occur. Then, as the project progressed, the manager was able to see which activities were on schedule and which were behind schedule.

LO17.4 Explain the nature and importance of a work breakdown structure in project management.

Work breakdown structure (WBS)  A hierarchical listing of what must be done during a project.

FIGURE 17.2 Schematic of a work breakdown structure

Level 1

Level 2

Level 3

Level 4

Project

ste24102_ch17_730-781.indd 739ste24102_ch17_730-781.indd 739 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

740 Chapter Seventeen Project Management

However, Gantt charts fail to reveal certain relationships among activities that can be crucial to effective project management. For instance, if one of the early activities in a project suf- fers a delay, it would be important for the manager to be able to easily determine which later activities would result in a delay. Conversely, some activities may safely be delayed without affecting the overall project schedule. The Gantt chart does not directly reveal this. On more complex projects, it is often used in conjunction with a network diagram, defined in the fol- lowing section, for scheduling purposes.

17.6 PERT AND CPM PERT (program evaluation and review technique) and CPM (critical path method) are two of the most widely used techniques for planning and coordinating large-scale projects. By using PERT or CPM, managers are able to obtain

1. A graphical display of project activities.

2. An estimate of how long the project will take.

3. An indication of which activities are the most critical to timely project completion.

4. An indication of how long any activity can be delayed without delaying the project.

Although PERT and CPM were developed independently, they have a great deal in com- mon. Moreover, many of the initial differences between them have disappeared as users bor- rowed certain features from one technique for use with the other. For practical purposes, the two techniques now are the same; the comments and procedures described will apply to CPM analysis as well as to PERT analysis of projects.

The Network Diagram One of the main features of PERT and related techniques is their use of a network or pre- cedence diagram to depict major project activities and their sequential relationships. There are two slightly different conventions for constructing these network diagrams. Under one convention, the arrows designate activities; under the other convention, the nodes designate activities. These conventions are referred to as activity-on-arrow (AOA) and activity-on- node (AON) . Activities consume resources and/or time. The nodes in the AOA approach rep- resent the activities’ starting and finishing points, which are called events . Events are points

PERT  Program evaluation and review technique, for planning and coordinating large projects.

CPM  Critical path method, for planning and coordinating large projects.

LO17.5 Give a general description of PERT/CPM techniques.

Network (precedence) diagram  Diagram of project activities that shows sequential relationships by use of arrows and nodes.

Activity-on-arrow (AOA)  Network diagram con- vention in which arrows desig- nate activities.

FIGURE 17.3 Gantt chart for bank example Start 2 4 6 8 10 12 14 16 18 20

Locate new facilities

Activity Weeks after start

Interview prospective staff

Hire and train staff

Select and order furniture

Remodel and install phones

Furniture received and set up

Move in/ startup

Start 2 4 6 8 10 12 14 16 18 20

Weeks after start

ste24102_ch17_730-781.indd 740ste24102_ch17_730-781.indd 740 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

Chapter Seventeen Project Management 741

in time. Unlike activities, they consume neither resources nor time. The nodes in an AON diagram represent activities.

Both conventions are illustrated in Figure 17.4 , using the bank example that was depicted in the Gantt chart in Figure 17.3 . Compare the two. In the AOA diagram, the arrows represent activities and they show the sequence in which certain activities must be performed (e.g., Inter- view precedes Hire and train); in the AON diagram, the arrows show only the sequence in which certain activities must be performed while the nodes represent the activities. Activities in AOA networks can be referred to in either of two ways. One is by their endpoints (e.g., activity 2-4) and the other is by a letter assigned to an arrow (e.g., activity c ). Both methods are illustrated in this chapter. Activities in AON networks are referred to by a letter (or number) assigned to a node. Although these two approaches are slightly different, they both show sequential relation- ships—something Gantt charts don’t. Note that the AON diagram has a starting node, S, which is actually not an activity but is added in order to have a single starting node.

Despite these differences, the two conventions are remarkably similar, so you should not encounter much difficulty in understanding either one. In fact, there are convincing arguments for having some familiarity with both approaches. Perhaps the most compelling is that both approaches are widely used. Moreover, a contractor doing work for the organization may be using the other approach, so employees of the organization who deal with the contractor on project matters would benefit from knowledge of the other approach. However, any particular organization would typically use only one approach, and employees would have to work with that approach.

Of particular interest to managers are the paths in a network diagram. A path is a sequence of activities that leads from the starting node to the ending node. For example, in the AOA dia- gram, the sequence 1-2-4-5-6 is a path. In the AON diagram, S-1-2-6-7 is a path. Note that in both diagrams there are three paths. One reason for the importance of paths is that they reveal sequential relationships. The importance of sequential relationships cannot be overstated: If one activity in a sequence is delayed (i.e., late) or done incorrectly, the start of all following activities on that path will be delayed.

Another important aspect of paths is the length of a path: How long will a particular sequence of activities take to complete? The length (of time) of any path can be determined by summing the expected times of the activities on that path. The path with the longest time is of particular interest because it governs project completion time. In other words, expected project duration equals the expected time of the longest path. Moreover, if there are any delays along the longest path, there will be corresponding delays in project completion time. Attempts to shorten project completion must focus on the longest sequence of activities. Because of its influence on project completion time, the longest path is referred to as the critical path , and its activities are referred to as critical activities .

Activities  Project steps that consume resources and/or time.

Activity-on-node (AON)  Network diagram con- vention in which nodes designate activities.

Events  The starting and finish- ing of activities, designated by nodes in the AOA convention.

Path  A sequence of activities that leads from the starting node to the finishing node.

Critical path  The longest path; determines expected project duration.

Critical activities  Activities on the critical path.

FIGURE 17.4 A simple project network diagram

1

2

Activity-on-arrow (AOA) diagram

3

5

4

6

Lo cat

e

fac ilit

ies

Interview Hir e a

nd

tra in

Remodel

Ord er

furn itur

e Furniture

setup

Move in S

1

3

5

2

4

7

6

Move in

Hire and train

Locate facilities

Order furniture

Remodel

Interview

Furniture setup

Activity-on-node (AON) diagram

ste24102_ch17_730-781.indd 741ste24102_ch17_730-781.indd 741 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

742 Chapter Seventeen Project Management

Paths that are shorter than the critical path can experience some delays and still not affect the overall project completion time as long as the ultimate path time does not exceed the length of the critical path. The allowable slippage for any path is called slack , and it reflects the difference between the length of a given path and the length of the critical path. The criti- cal path, then, has zero slack time.

Network Conventions Developing and interpreting network diagrams requires some familiarity with networking conventions. Table 17.2 illustrates some of the most basic and most common features of net- work diagrams. This will provide sufficient background for understanding the basic concepts associated with precedence diagrams and allow you to solve typical problems.

A special feature that is sometimes used in AOA networks to clarify relationships is a dummy activity. In order to recognize the need to use a dummy activity using the AOA approach when presented with a list of activities and the activities each precedes, examine the “Immedi- ate Predecessor” list. Look for instances where multiple activities are listed, such as a, b in the following list. If a or b appears separately in the list (as b does in the table below), a dummy will be needed to clarify the relationship (see the last diagram in Table 17.2 ).

Here are two more AOA conventions:

For reference purposes, nodes are numbered typically from left to right, with lower num- bers assigned to preceding nodes and higher numbers to following nodes:

Starting and ending arrows are sometimes used during development of a network for increased clarity:

Slack  Allowable slippage for a path; the difference between the length of a path and the length of the critical path.

LO17.6 Construct simple network diagrams.

Activity Immediate Predecessor

a — b — c a, b d b

a

c

b d

e

2

3

4

5 1

End

a

c

b d

e

2

3

4

5 1

Start

ste24102_ch17_730-781.indd 742ste24102_ch17_730-781.indd 742 11/23/13 9:35 AM11/23/13 9:35 AM

Final PDF to printer

Chapter Seventeen Project Management 743

TABLE 17.2 Network conventions

a

b

a b c

a c

Dummy activity

a

b c

b

c

c

d

a

a

b

b

c

d

AOA AONInterpretation

Activities must be completed in sequence: first a, then b, and then c.

Both a and b must be completed before c can start.

Activity a must be completed before b or c can start.

Both a and b must be completed before c or d can start.

Use a dummy activity to clarify relationships:

1. To separate two activities that have the same starting and ending nodes.

2. When activities share some, but not all, preceding activities. Here, activity c is preceded by activities a and b, while activity d is only preceded by activity b.

(No dummy needed)

(No dummy needed)

ba c

a

c

a

b

c

c

d

a

b

b

Given the additional information on the bank network of Figure 17.4 shown in Figure 17.5 , determine

a. The length of each path.

b. The critical path.

c. The expected length of the project.

d. The amount of slack time for each path.

17.7 DETERMINISTIC TIME ESTIMATES The main determinant of the way PERT and CPM networks are analyzed and interpreted is whether activity time estimates are probabilistic or deterministic. If time estimates can be made with a high degree of confidence that actual times are fairly certain, we say the esti- mates are deterministic . If actual times are subject to variation, we say the estimates are probabilistic . Probabilistic time estimates must include an indication of the extent of prob- able variation.

This section describes analysis of networks with deterministic time estimates. A later sec- tion deals with probabilistic times.

One of the best ways to gain an understanding of the nature of network analysis is to con- sider a simple example.

LO17.7 Analyze networks with deterministic times.

Deterministic  Time estimates that are fairly certain.

Probabilistic  Estimates of times that allow for variation.

E X A M P L E 1

ste24102_ch17_730-781.indd 743ste24102_ch17_730-781.indd 743 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

744 Chapter Seventeen Project Management

17.8 A COMPUTING ALGORITHM Many real-life project networks are much larger than the simple network illustrated in the preceding example; they often contain hundreds or even thousands of activities. Because the necessary computations can become exceedingly complex and time-consuming, large net- works are generally analyzed by computer programs instead of manually. Planners use an algorithm to develop four pieces of information about the network activities:

ES, the earliest time activity can start, assuming all preceding activities start as early as possible.

EF, the earliest time the activity can finish.

LS, the latest time the activity can start and not delay the project.

LF, the latest time the activity can finish and not delay the project.

Once these values have been determined, they can be used to find

1. Expected project duration.

2. Slack time.

3. The critical path.

Activity-on-Arrow The three examples that follow illustrate how to compute those values using the precedence diagram of Example 1.

SCREENCAM TUTORIAL

S O L U T I O N a. As shown in the following table, the path lengths are 18 weeks, 20 weeks, and 14 weeks.

b. Path 1-2-5-6 is the longest path (20 weeks), so it is the critical path.

c. The expected length of the project is equal to the length of the critical path (i.e., 20 weeks).

d. We find the slack for each path by subtracting its length from the length of the critical path, as shown in the last column of the table. ( Note: It is sometimes desirable to know the slack time associated with activities. The next section describes a method for obtaining those slack times.)

Path Length (weeks) Slack

1-2-4-5-6 8  �  6  �  3  �  1  �  18 20  �  18  �  2

1-2-5-6 8  �  11  �  1  �  20 * 20  �  20  �  0

1-3-5-6 4  �  9  �  1  �  14 20  �  14  �  6

*Critical path length.

FIGURE 17.5 AOA diagram

SCREENCAM TUTORIAL

8 w eek

s

Loc ate

1

2

3

4

5 6

6 wee ks

Order

furnit ure

11 weeksRemodel

3 w eeks

Setup

1 week

Move in

9 w eek

s

Hir e a

nd tra

in 4 weeksInterview

ste24102_ch17_730-781.indd 744ste24102_ch17_730-781.indd 744 11/23/13 9:35 AM11/23/13 9:35 AM

Final PDF to printer

Chapter Seventeen Project Management 745

E X A M P L E 2

S O L U T I O N

Compute the earliest starting time and earliest finishing time for each activity in the diagram shown in Figure 17.5 .

e celx mhhe.com/stevenson12e

Begin by placing brackets at the two ends of each starting activity:

We want to determine and place in the brackets for each activity the earliest starting time, ES, and the earliest finishing time, EF, for every activity, and put them in brackets, as follows:

ES EFt

Do this for all activities, beginning at the left side of the precedence diagram and moving to the right side.

Once ES has been determined for each activity, EF can be found by adding the activity time, t, to ES: ES  �   t   �  EF.

Use an ES of 0 for all starting activities. Thus, activities 1-2 and 1-3 are assigned ES values of 0. This permits computation of the EF for each of these activities:

EF 0 8 8 and EF 0 4 41-2 1-3� � � � � �

8

1

2

3

4

5 6

4

0

8

0

4 The EF time for an activity becomes the ES time for the next activity to follow it in the

diagram. Hence, because activity 1-2 has an EF time of 8, both activities 2-4 and 2-5 have ES times of 8. Similarly, activity 3-5 has an ES time of 4.

8

1

2

3

4

5 6

4

0

8

0

4

8

8

4

This permits calculation of the EF times for these activities: EF 2-4   �   8  �   6  �   14;  EF 2-5   �  8  �  11  �  19; and EF 3-5   �  4  �  9  �  13.

ste24102_ch17_730-781.indd 745ste24102_ch17_730-781.indd 745 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

746 Chapter Seventeen Project Management

Computation of earliest starting and finishing times is aided by two simple rules:

1. The earliest finish time for any activity is equal to its earliest start time plus its expected duration, t:

EF � ES � t (17–1)

2. ES for activities at nodes with one entering arrow is equal to EF of the entering arrow. ES for activities leaving nodes with multiple entering arrows is equal to the largest EF of the entering arrow.

8

1

2

3

4

5 6

4

0

8

0

4

9

11

68 14

8

19

4

13

The ES for activity 4-5 is the EF time of activity 2-4, which is 14. Using this value, we find the EF for activity 4-5 is 17; EF 4-5   �  14  �  3  �  17.

8

1

2

3

4

5 6

4

0

8

0

4

9

11

68 14

8

19

4

13

3 14

17

In order to determine the ES for activity 5-6, we must realize that activity 5-6 cannot start until every activity that precedes it is finished. Therefore, the largest of the EF times for the three activities that precede activity 5-6 determines ES 5-6 . Hence, the ES for activity 5-6 is 19.

8

1

2

3

4

5 6

4

0

8

0

4

9

11

68 14

8

19

4

13

3 14

17

19 20 1

Then the EF for the last activity, 5-6, is 20; EF 5-6   �  19  �  1  �  20. Note that the latest EF is the project duration. Thus, the expected length of the project is 20 weeks.

ste24102_ch17_730-781.indd 746ste24102_ch17_730-781.indd 746 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

Chapter Seventeen Project Management 747

Computation of the latest starting and finishing times is aided by the use of two rules:

1. The latest starting time for each activity is equal to its latest finishing time minus its expected duration:

EF � ES � t (17–2)

2. For nodes with one leaving arrow, LF for arrows entering that node equals the LS of the leaving arrow. For nodes with multiple leaving arrows, LF for arrows entering that node equals the smallest LS of leaving arrows.

Finding ES and EF times involves a forward pass through the network; finding LS and LF times involves a backward pass through the network. Hence, we must begin with the EF of the last activity and use that time as the LF for the last activity. Then we obtain the LS for the last activity by subtracting its expected duration from its LF.

RULES FOR THE COMPUTING ALGORITHM ( Note: For an AON diagram, if a starting node or ending node does not have a time associated with it, ignore that node.)

Forward Pass For each path, start at the left side of the diagram and work toward the right side.

For each beginning activity: ES  �  0.

For each activity: ES  �  Activity time  �  EF.

For the following activity: ES  �  EF of preceding activity.

Note: If an activity has multiple immediate preceding activities, set its ES equal to the largest EF of its immediate predecessors.

Backward Pass For each path, start at the right side of the diagram and work toward the left side.

Use the largest EF as the LF for all ending activities.

For each activity: LS  �  LF  �  Activity time.

For the preceding activity: LF  �  LS of following activity. Note: If an activity has multiple immediately following activi-

ties, set the activity’s LF equal to the smallest LS of the following activities.

E X A M P L E 3

S O L U T I O N

Compute the latest finishing and starting times for the precedence diagram developed in Example 2.

e celx mhhe.com/stevenson12e

We must add the LS and LF times to the brackets on the diagram.

LS ES

LF EF

Begin by setting the LF time of the last activity equal to the EF of that activity. Thus,

LF5-6 � EF5-6 � 20 weeks

Obtain the LS time for activity 5-6 by subtracting the activity time, t, from the LF time:

LS5-6 � LF5-6 � t � 20 � 1 � 19

Mark these values on the diagram:

8

1

2

3

4

5 6

4

0

8

0

4

9

11

68 14

8

19

4

13

3 14

17

19 19

20 20

1

ste24102_ch17_730-781.indd 747ste24102_ch17_730-781.indd 747 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

748 Chapter Seventeen Project Management

The LS time of 19 for activity 5-6 now becomes the LF time for each of the activities that precedes activity 5-6. This permits determination of the LS times for each of those activities: Subtract the activity time from the LF to obtain the LS time for the activity. The LS time for activity 3-5 is 19  �  9  �  10.

8

1

2

3

4

5 6

4

0

8

0

4

9

11

68 14

8 8

19 19

10 4

19 13

3 1614

1917

19 19

20 20

1

Next, the LS for activity 4-5, which is 16, becomes the LF for activity 2-4, and the LS for

activity 3-5, which is 10, becomes the LF for activity 1-3. Using these values, you find the LS for each of these activities by subtracting the activity time from the LF time.

8

1

2

3

4

5 6

4

0

8

6 0

10 4

9

11

6 10 8

16 14

8 8

19 19

10 4

19 13

3 1614

1917

19 19

20 20

1

The LF for activity 1-2 is the smaller of the two LS times of the activities that 1-2 precedes.

Hence, the LF time for activity 1-2 is 8. The reason you use the smaller time is that activity 1-2 must finish at a time that permits all following activities to start no later than their LS times.

Once you have determined the LF time of activity 1-2, find its LS time by subtracting the activity time of 8 from the LF time of 8. Hence, the LS time is 0.

8

1

2

3

4

5 6

4

0 0

8 8

6 0

10 4

9

11

6 10 8

16 14

8 8

19 19

10 4

19 13

3 1614

1917

19 19

20 20

1

Activity-on-Node The computing algorithm is performed in essentially the same manner in the AON approach. Figure 17.6 shows the node diagram, and Figures 17.7A , B , and C illustrate the computing algorithm.

ste24102_ch17_730-781.indd 748ste24102_ch17_730-781.indd 748 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

Chapter Seventeen Project Management 749

FIGURE 17.6 AON diagram

S

1

3

5

2

4

7

6

8

4

11

6

9

1

3 Move in

Hire and train

Locate facilities

Order furniture

Remodel

Interview

Estimated activity completion time

in weeks

Furniture setup

FIGURE 17.7A AON diagram with brackets added

S

1

3

5

2

4

7

1

6

9

11

3

6

8t

4

FIGURE 17.7B Forward pass

S

1

3

5

2

4

7

119

6

20

94 13

118 19

314 17

6

11

8 14

80 8

tES EF

40 4

ste24102_ch17_730-781.indd 749ste24102_ch17_730-781.indd 749 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

750 Chapter Seventeen Project Management

Computing Slack Times The slack time can be computed in either of two ways:

Slack � LS � ES or LF � EF (17–3)

The critical path using this computing algorithm is denoted by activities with zero slack time. Thus, the table in Example 4 indicates that activities 1-2, 2-5, and 5-6 are all critical activities, which agrees with the results of the intuitive approach demonstrated in Example 1.

Knowledge of slack times provides managers with information for planning the allocation of scarce resources and for directing control efforts toward those activities that might be most susceptible to delaying the project. In this regard, it is important to recognize that the activ- ity slack times are based on the assumption that all of the activities on the same path will be started as early as possible and not exceed their expected times. Furthermore, if two activities are both on the same path (e.g., activities 2-4 and 4-5 in the preceding example) and have the same slack (e.g., two weeks), this will be the total slack available to both. In essence, the activities have shared slack. Hence, if the first activity uses all the slack, there will be zero slack for all following activities on that same path.

FIGURE 17.7C Backward pass

S

1

3

5

2

4

7

1 19 19

6

20 20

9 10 4 13

19

11 8 8

19 19

3 16 14 17

19

6 10 8 14

16

8 0 0

8 8

t LS ES EF

LF

4 6 0 4

10

E X A M P L E 4

S O L U T I O N

Compute slack times for the preceding example.

Either the starting times or the finishing times can be used. Suppose we choose the starting times. Using ES times computed in Example 2 and LS times computed in Example 3, slack times are

Activity LS ES (LS – ES)

Slack

1-2 0 0 0 1-3 6 0 6 2-4 10 8 2 2-5 8 8 0 3-5 10 4 6 4-5 16 14 2 5-6 19 19 0

Activities that have a slack of zero are on the critical path. Hence, the critical path is 1-2-5-6.

e celx mhhe.com/stevenson12e

As noted earlier, this algorithm lends itself to computerization. A computer printout for this problem would appear something like the one shown in Table 17.3 .

ste24102_ch17_730-781.indd 750ste24102_ch17_730-781.indd 750 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

Chapter Seventeen Project Management 751

17.9 PROBABILISTIC TIME ESTIMATES The preceding discussion assumed that activity times were known and not subject to varia- tion. While that condition exists in some situations, there are many others where it does not. Consequently, those situations require a probabilistic approach.

The probabilistic approach involves three time estimates for each activity instead of one:

1. Optimistic time: The length of time required under optimum conditions; represented by t o .

2. Pessimistic time: The length of time required under the worst conditions; represented by t p .

3. Most likely time: The most probable amount of time required; represented by t m .

Managers or others with knowledge about the project can make these time estimates. The beta distribution is generally used to describe the inherent variability in time esti-

mates (see Figure 17.8 ). Although there is no real theoretical justification for using the beta distribution, it has certain features that make it attractive in practice: The distribution can be symmetrical or skewed to either the right or the left according to the nature of a particular activity; the mean and variance of the distribution can be readily obtained from the three time estimates listed above; and the distribution is unimodal with a high concentration of probabil- ity surrounding the most likely time estimate.

Of special interest in network analysis are the average or expected time for each activity, t e , and the variance of each activity time, 2� . The expected time of an activity, t e , is a weighted average of the three time estimates:

4

6 t

t t t e

o m p= + + (17–4)

Optimistic time  The length of time required under optimal conditions.

Pessimistic time  The length of time required under the worst conditions.

Most likely time  The most probable length of time that will be required.

Beta distribution  Used to describe the inherent variability in activity time estimates.

SCHEDULE

EARLY LATE

Activity Time ES EF LS LF Slack

1-2 8.00 0.00 8.00 0.00 8.00 0.00

1-3 4.00 0.00 4.00 6.00 10.00 6.00

2-4 6.00 8.00 14.00 10.00 16.00 2.00

2-5 11.00 8.00 19.00 8.00 19.00 0.00

3-5 9.00 4.00 13.00 10.00 19.00 6.00

4-5 3.00 14.00 17.00 16.00 19.00 2.00

5-6 1.00 19.00 20.00 19.00 20.00 0.00

THE CRITICAL PATH SEQUENCE IS:

SNODE FNODE TIME

1 2 8.00

2 5 11.00

5 6 1.00

20.00

TABLE 17.3 Computer printout

LO17.8 Analyze networks with probabilistic times.

FIGURE 17.8 A beta distribution is used to describe probabilistic time estimates

Activity start

0

Optimistic time

Most likely time (mode)

Pessimistic time

te tptmto

ste24102_ch17_730-781.indd 751ste24102_ch17_730-781.indd 751 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

752 Chapter Seventeen Project Management

The expected duration of a path (i.e., the path mean) is equal to the sum of the expected times of the activities on that path:

Path mean of expected times of activities on the path∑� (17–5)

The standard deviation of each activity’s time is estimated as one-sixth of the difference between the pessimistic and optimistic time estimates. (Analogously, nearly all of the area under a normal distribution lies within three standard deviations of the mean, which is a range of six standard deviations.) We find the variance by squaring the standard deviation. Thus,

( )

6 or

( )

36 2

2 2t t t tp o p o⎡ ⎣⎢

⎤ ⎦⎥

� � � �

(17–6)

The size of the variance reflects the degree of uncertainty associated with an activity’s time: The larger the variance, the greater the uncertainty.

It is also desirable to compute the standard deviation of the expected time for each path. We can do this by summing the variances of the activities on a path and then taking the square root of that number; that is,

(Variances of activities on path)path ∑� � (17–7)

Example 5 illustrates these computations.

E X A M P L E 5

e celx mhhe.com/stevenson12e

The network diagram for a project is shown in the accompanying figure, with three time esti- mates for each activity. Activity times are in weeks. Do the following:

a. Compute the expected time for each activity and the expected duration for each path.

b. Identify the critical path.

c. Compute the variance of each activity and the variance and standard deviation of each path.

3-4-5 d

3-5-7 e

5-7-9 f

2-4-6 b

4-6-8 h

1-3 -4

a

2-3-6 g

2-3-5 c

3-4 -6

i

Most likely time

Optimistic time

Pessimistic time

AOA diagram

3-4-5 3-5-7 5-7-9

AON diagram

d e f

1-3-4 2-4-6 2-3-5

a b c

2-3-6 4-6-8 3-4-6

g h i

FinishStart

ste24102_ch17_730-781.indd 752ste24102_ch17_730-781.indd 752 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

Chapter Seventeen Project Management 753

Knowledge of the expected path times and their standard deviations enables a manager to compute probabilistic estimates of the project completion time, such as these:

The probability that the project will be completed by a specified time.

The probability that the project will take longer than its scheduled completion time.

These estimates can be derived from the probability that various paths will be completed by the specified time. This involves the use of the normal distribution. Although activity times are represented by a beta distribution, the path distribution is represented by a normal distribu- tion. The central limit theorem tells us that the summing of activity times (random variables) results in a normal distribution. This is illustrated in Figure 17.9 . The rationale for using a normal distribution is that sums of random variables (activity times or means) will tend to be normally distributed, regardless of the distributions of the variables. The normal tendency improves as the number of random variables increases. However, even when the number of items being summed is fairly small, the normal approximation provides a reasonable approxi- mation to the actual distribution.

S O L U T I O N a. TIMES

= + +

t t t t

e o m p4

6

Path Activity t o t m t p Path Total

a-b-c a 1 3 4 2.83

b 2 4 6 4.00 10.00

c 2 3 5 3.17

d-e-f d 3 4 5 4.00

e 3 5 7 5.00 16.00

f 5 7 9 7.00

g-h-i g 2 3 6 3.33

h 4 6 8 6.00 13.50

i 3 4 6 4.17

TIMES

� )(=� t tact p o 36

2 2

�2path

�  path

Path Activity t o t m t p

a-b-c a 1 3 4 (4  �  1) 2 /36  �   9/36

b 2 4 6 (6  �  2) 2 /36  �  16/36 34/36  �  0.944 0.97

c 2 3 5 (5  �  2) 2 /36  �   9/36

d-e-f d 3 4 5 (5  �  3) 2 /36  �   4/36

e 3 5 7 (7  �  3) 2 /36  �  16/36 36/36  �  1.00 1.00

f 5 7 9 (9  �  5) 2 /36  �  16/36

g-h-i g 2 3 6 (6  �  2) 2 /36  �  16/36

h 4 6 8 (8  �  4) 2 /36  �  16/36 41/36  �  1.139 1.07

i 3 4 6 (6  �  3) 2 /36  �  9/36

b. The path that has the longest expected duration is the critical path. Because path d-e-f has the largest path total, it is the critical path.

c.

FIGURE 17.9 Activity distributions and the path distribution

Normal

Path

Beta

mean meanmeanmean

Activity

��� Beta

Activity

Beta

Activity

} }

}

} }

}

ste24102_ch17_730-781.indd 753ste24102_ch17_730-781.indd 753 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

754 Chapter Seventeen Project Management

17.10 DETERMINING PATH PROBABILITIES The probability that a given path will be completed in a specified length of time can be deter- mined using the following formula:

Specified time Path mean

Path standard deviation z �

� (17–8)

The resulting value of z indicates how many standard deviations of the path distribution the specified time is beyond the expected path duration. The more positive the value, the better. (A negative value of z indicates that the specified time is earlier than the expected path duration.) Once the value of z has been determined, it can be used to obtain the probability that the path will be completed by the specified time from Appendix B, Table B. Note that the probability is equal to the area under the normal curve to the left of z, as illustrated in Figure 17.10 .

If the value of z is � 3.00 or more, the path probability is close to 100 percent (for z   �   � 3.00, it is .9987). Hence, it is very likely the activities that make up the path will be completed by the specified time. For that reason, a useful rule of thumb is to treat the path probability as being equal to 100 percent if the value of z is � 3.00 or more.

Rule of thumb: If the value of z is 13.00 or more, treat the probability of path completion by the specified time as 100 percent.

A project is not completed until all of its activities have been completed, not only those on the critical path. It sometimes happens that another path ends up taking more time to complete than the critical path, in which case the project runs longer than expected. Hence, it can be risky to focus exclusively on the critical path. Instead, one must consider the possibility that at least one other path will delay timely project completion. This requires determining the prob- ability that all paths will finish by a specified time. To do that, find the probability that each path will finish by the specified time, and then multiply those probabilities. The result is the probability that the project will be completed by the specified time.

It is important to note the assumption of independence . It is assumed that path duration times are independent of each other. In essence, this requires two things: Activity times are independent of each other, and each activity is only on one path. For activity times to be inde- pendent, the time for one must not be a function of the time of another; if two activities were always early or late together, they would not be considered independent. The assumption of independent paths is usually considered to be met if only a few activities in a large project are on multiple paths. Even then, common sense should govern the decision of whether the independence assumption is justified.

Independence  Assumption that path duration times are independent of each other; requiring that activity times be independent, and that each activity is on only one path.

FIGURE 17.10 The path probability is the area under a normal curve to the left of z

0

Probability of completing

the path by the specified time

Expected path duration

Specified time

z

Using the information from Example 5, answer the following questions:

a. Can the paths be considered independent? Why?

b. What is the probability that the project can be completed within 17 weeks of its start?

c. What is the probability that the project will be completed within 15 weeks of its start?

d. What is the probability that the project will not be completed within 15 weeks of its start?

E X A M P L E 6 e celx

mhhe.com/stevenson12e

ste24102_ch17_730-781.indd 754ste24102_ch17_730-781.indd 754 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

Chapter Seventeen Project Management 755

a. Yes, the paths can be considered independent, since no activity is on more than one path and you have no information suggesting that any activity times are interrelated.

b. To answer questions of this nature, you must take into account the degree to which the path distributions “overlap” the specified completion time. This overlap concept is illus- trated in the accompanying figure, which shows the three path distributions, each cen- tered on that path’s expected duration, and the specified completion time of 17 weeks. The shaded portion of each distribution corresponds to the probability that the part will be completed within the specified time. Observe that paths a-b-c and g-h-i are well enough to the left of the specified time, so that it is highly likely that both will be finished by week 17, but the critical path overlaps the specified completion time. In such cases, you need consider only the distribution of path d-e-f in assessing the probability of comple- tion by week 17.

To find the probability for a path you must first compute the value of z using Formula 17–8 for the path. For example, for path d-e-f, we have

17 16 1.00

1.00z � �

� �

S O L U T I O N

17 weeks

Path

a-b-c

d-e-f

g-h-i

1.00

10.0

1.00

13.5

16.0

Weeks

Weeks

Weeks

Turning to Appendix B, Table B, with z   �   � 1.00, you will find that the area under the curve to the left of z is .8413. The computations are summarized in the following table. Note: If the value of z exceeds � 3.00, treat the probability of completion as being equal to 1.000.

Path =

- z

17 Expected path duration Path standard deviation

Probability of Completion in 17 Weeks

a-b-c

� � �

17 10

0.97 7.22

1.00

d-e-f

� � �

17 16

1.00 1.00

.8413

g-h-i

� � �

17 13.5

1.07 3.27

1.00

ste24102_ch17_730-781.indd 755ste24102_ch17_730-781.indd 755 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

756 Chapter Seventeen Project Management

17.11 SIMULATION We have examined a method for computing the probability that a project would be completed in a specified length of time. That discussion assumed that the paths of the project were inde- pendent; that is, the same activities are not on more than one path. If an activity were on more than one path and it happened that the completion time for that activity far exceeded its expected time, all paths that included that activity would be affected and, hence, their times would not be independent. Where activities are on multiple paths, one must consider if the

(Finish by week 17) (Path a-b-c finish) (Path d-e-f finish)

1.00 .8413 (Path g-h-i finish)

1.00 .8413 P P P P� � �

� � � � c. For a specified time of 15 weeks, the z values are

Path =

- z

15 Expected path duration

Path standard deviation Probability of Completion in

15 Weeks

a-b-c

� � �

15 10.00

.97 5.15

1.00

d-e-f

� � �

15 16.00

1.00 1.00

.1587

g-h-i

� � �

15 13.50

1.07 1.40

.9192

Paths d-e-f and g-h-i have z values that are less than � 3.00. From Appendix B, Table B, the area to the left of z   �   � 1.00 is .1587, and the area

to the left of z   �   � 1.40 is .9192. The path distributions are illustrated in the figure. The joint probability of all finishing before week 15 is the product of their probabilities: 1.00(.1587)(.9192)  �  .1459.

d. The probability of not finishing before week 15 is the complement of the probability obtained in part c: 1  �  .1459  �  .8541.

15

weeks Path

a-b-c

d-e-f

g-h-i

1.00

10.0

.9192

13.5

16.0

Weeks

Weeks

Weeks

.1587

ste24102_ch17_730-781.indd 756ste24102_ch17_730-781.indd 756 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

Chapter Seventeen Project Management 757

preceding approach can be used. For instance, if only a few activities are on multiple paths, particularly if the paths are much shorter than the critical path, that approach may still be reasonable. Moreover, for purposes of illustration, as in the text problems and examples, the paths are treated as being independent when, in fact, they may not be.

In practice, when dependent cases occur, project planners often use simulation. It amounts to a form of repeated sampling wherein many passes are made through the project network. In each pass, a randomly selected value for each activity time is made based on the characteristics of the activity’s probability distribution (e.g., its mean, standard deviation, and distribution type). After each pass, the expected project duration is determined by adding the times along each path and designating the time of the longest path as the project duration. After a large number of such passes (e.g., several hundred), there is enough information to prepare a frequency distribution of the project duration times. Planners can use this distribution to make a probabilistic assessment of the actual project duration, allowing for some activities that are on more than one path. Problem 19 in the simulation supplement to Chapter 18 located on the text Web site illustrates this.

17.12 BUDGET CONTROL Budget control is a critical aspect of a project. Costs can exceed budget for a number of reasons, and unless corrective action is taken, serious cost overruns can occur, possibly putting the project in jeopardy. Cost overruns can occur for various reasons. One possibility is that initial estimates might have been overly optimistic. Another is that unforeseen events such as weather or supplier issues, work or parts that were substandard and had to be remedied, or some other event added costs.

Table 17.4 illustrates the project cost status for a hypothetical project that is in progress. For this project, the first three activities have been completed. Activity A was $1,000 under budget, Activity B was right at its budgeted amount, and Activity C was over budget by $3,500. The remaining activities are incomplete, but each has a projected cost and a projected difference. Unless there is a change during the remaining life of the project, the cost overrun is projected to be $4,000. The project manager will have to decide if that amount is accept- able, or whether corrective action should be initiated. Although managers’ intuitive feeling may be to focus on the activities that are over budget, they would likely review all activities to see where potential savings are possible. Of course, the project cost status would be updated, usually on a daily or weekly basis, to keep the project manager informed.

17.13 TIME–COST TRADE-OFFS: CRASHING Estimates of activity times for projects usually are made for some given level of resources. In many situations, it is possible to reduce the length of a project by injecting additional resources. The impetus to shorten projects may reflect efforts to avoid late penalties, to

LO17.9 Describe activity “crashing” and solve typical problems.

TABLE 17.4 Project cost status for a hypothetical project

Activity Budgeted

Cost Percent

Complete

Actual or Projected

Cost (Over/Under)

Actual–Budget

A $25,000 100% $24,000 $1,000 B 15,000 100 15,000 0 C 22,000 100 25,500 � 3,500 D 10,000 75 10,500 � 500 E 30,000 50 29,000 1,000 F 20,000 40 22,000 � 2,000 G 8,000 25 8,000 0 � $4,000

ste24102_ch17_730-781.indd 757ste24102_ch17_730-781.indd 757 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

758 Chapter Seventeen Project Management

Workers demolish the south side of the Mulholland overpass on the 405 freeway during the 53-hour total freeway closure. The bridge was demolished as part of a $1 billion project to add carpool lanes and to make other improvements along the route from Orange County to San Francisco.

take advantage of monetary incentives for timely or early completion of a project, or to free resources for use on other projects. In new product development, shortening may lead to a strategic benefit: beating the competition to the market. In some cases, however, the desire to shorten the length of a project merely reflects an attempt to reduce the costs associated with running the project, such as facilities and equipment costs, supervision, and labor and personnel costs. Managers often have various options at their disposal that will allow them to shorten, or crash , certain activities. Among the most obvious options are the use of additional funds to support additional personnel or more efficient equipment, and the relaxing of some work specifications. Hence, a project manager may be able to shorten a project by increasing direct expenses to speed up the project, thereby realizing savings on indirect project costs. The goal in evaluating time–cost trade-offs is to identify activities that will reduce the sum of the project costs.

In order to make a rational decision on which activities, if any, to crash and on the extent of crashing desirable, a manager needs certain information:

1. Regular time and crash time estimates for each activity.

2. Regular cost and crash cost estimates for each activity.

3. A list of activities that are on the critical path.

Activities on the critical path are potential candidates for crashing, because shortening noncritical activities would not have an impact on total project duration. From an economic standpoint, activities should be crashed according to crashing costs: Crash those with the low- est crash costs first. Moreover, crashing should continue as long as the cost to crash is less than the benefits derived from crashing. Figure 17.11 illustrates the basic cost relationships.

Crashing analysis requires estimates of regular and crash times and costs for each activity, path lengths, and identification of critical activities. The general procedure for crashing is

1. Crash the project one period at a time.

2. Crash the least expensive activity that is on the critical path.

3. When there are multiple critical paths, find the sum of crashing the least expensive activity on each critical path. If two or more critical paths share common activities, compare the least expensive cost of crashing a common activity shared by critical paths with the sum for the separate critical paths.

Crash  Shortening activity durations.

ste24102_ch17_730-781.indd 758ste24102_ch17_730-781.indd 758 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

Chapter Seventeen Project Management 759

FIGURE 17.11 Crashing activities *

*Crashing activities reduce indirect project costs and increase direct costs; the optimum amount of crashing results in minimizing the sum of these two types of costs.

Total cost

Cumulative cost of crashing

Expected project costs

Sh ort

en Sho

rten

CRASH

Shorten

Optimum Project length 0

C o

st

Using the following information, develop the optimal time–cost solution. Project costs are $1,000 per day.

Activity Normal Time

Crash Time

Cost per Day to Crash

a 6 6 —

b 10 8 $500

c 5 4 300

d 4 1 700

e 9 7 600

f 2 1 800

4 d

9 e

5 c

10 b

6 a

2 f

E X A M P L E 7

S O L U T I O N a. Determine which activities are on the critical path, its length, and the length of the other path: Path Length

a-b-f 18

c-d-e-f 20 (critical path)

b. Rank the critical path activities in order of lowest crashing cost, and determine the number of days each can be crashed. Note: Available days 5 Normal time � Crash time.

Activity Cost per Day to Crash Available Days

c $300 1

e 600 2

d 700 3

f 800 1

e celx mhhe.com/stevenson12e

SCREENCAM TUTORIAL

ste24102_ch17_730-781.indd 759ste24102_ch17_730-781.indd 759 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

760 Chapter Seventeen Project Management

An important benefit of the sequential crashing procedure just described is that it provides the ability to quote different budget costs for different project times.

17.14 ADVANTAGES OF USING PERT AND POTENTIAL SOURCES OF ERROR PERT and similar project scheduling techniques can provide important services for the proj- ect manager. Among the most useful features are these:

1. Use of these techniques forces the manager to organize and quantify available informa- tion and to recognize where additional information is needed.

2. The techniques provide a graphic display of the project and its major activities.

3. They identify ( a ) activities that should be closely watched because of the potential for delaying the project and ( b ) other activities that have slack time and so can be delayed without affecting project completion time. This raises the possibility of reallocating resources to shorten the project.

LO17.10 Discuss the advantages of using PERT and potential sources of error.

c. Begin shortening the project, one day at a time, and check after each reduction to see which path is critical. (After a certain point, another path may equal the length of the shortened critical path.) Thus:

(1) Shorten activity c one day at a cost of $300. The length of the critical path now becomes 19 days.

(2) Activity c cannot be shortened any more. Shorten activity e one day at a cost of $600. The length of path c-d-e-f now becomes 18 days, which is the same as the length of path a-b-f.

(3) The paths are now both critical; further improvements will necessitate shortening both paths.

The remaining activities for crashing and their costs are:

Path Activity Crash Cost (per day)

a-b-f a No reduction possible

b $500

f 800

c-d-e-f c No further reduction possible

d $700

e 600

f 800

At first glance, it would seem that crashing f would not be advantageous, because it has the highest crashing cost. However, f is on both paths, so shortening f by one day would shorten both paths (and hence, the project) by one day for a cost of $800. The option of shortening the least expensive activity on each path would cost $500 for b and $600 for e, or $1,100. Thus shorten f by one day. The project duration is now 17 days.

(4) At this point, no additional improvement is feasible. The cost to crash b is $500 and the cost to crash e is $600, for a total of $1,100, and that would exceed the indirect project costs of $1,000 per day.

(5) The crashing sequence is summarized below:

LENGTH AFTER CRASHING n DAYS:

Path  n  � 0 1 2 3

a-b-f 18 18 18 17

c-d-e-f 20 19 18 17

Activity crashed c e f

Cost $300 $600 $800

ste24102_ch17_730-781.indd 760ste24102_ch17_730-781.indd 760 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

Chapter Seventeen Project Management 761

No analytical technique is without potential errors. Among the more important sources of errors are the following:

1. When developing the project network, managers may unwittingly omit one or more important activities.

2. Precedence relationships may not all be correct as shown.

3. Time estimates may include a fudge factor; managers may feel uncomfortable about making time estimates because they appear to commit themselves to completion within a certain time period.

4. There may be a tendency to focus solely on activities that are on the critical path. As the project progresses, other paths may become critical. Furthermore, major risk events may not be on the critical path.

17.15 CRITICAL CHAIN PROJECT MANAGEMENT Critical chain project management (CCPM) is an approach to project management that includes an emphasis on the resources required to execute project tasks. It was developed by Eli Goldratt, who also developed the theory of constraints (see Chapter 16). Goldratt identifies certain aspects of projects that he believes managers need to be aware of to better manage projects:

1. Time estimates are often pessimistic and with attention can be made more realistic (i.e., shortened).

2. When activities are finished ahead of schedule, that fact may go unreported, so managers may be unaware of resources that could potentially be used to shorten the critical path.

The critical chain of a project is analogous to the critical path of a network. However, the critical chain approach takes into account not only sequential task relationships, but also resource constraints that can result in tasks being delayed when they must wait for a resource that is being used on another task.

A key feature of the critical chain approach is the use of various buffers. Feeding (time) buffers are positioned at points in the network where noncritical sections of the network feed into the critical chain path to reduce the risk of delaying critical chain activities. Their purpose is to insulate the critical chain from variation in noncritical chains’ activities. Not every intersection will require a time buffer; only those sections that have a relatively small degree of slack time will provide benefit from a time buffer. A project (time) buffer at the end of the project is used to reduce the risk that time variations on the critical chain will interfere with timely project completion. Capacity (resource) buffers are used when multiple projects are ongoing to help manage the impact of variation of resource requirements among projects.

Regular updates of activity status relative to planned completion times can enable the proj- ect manager to see where actual or potential problems can arise, as well as where buffers can be reduced or eliminated, to reconfigure buffers.

17.16 OTHER TOPICS IN PROJECT MANAGEMENT This section touches briefly on several other project management topics, including six-sigma projects, virtual project teams, and managing multiple projects.

One increasingly popular use of project management is for six-sigma projects. Although six-sigma projects tend to have a narrow focus, they still involve all of the typical elements and requirements of general project management. Six-sigma projects are discussed in more detail in Chapter 9.

As companies globalize operations, they are increasingly using virtual project teams . All the basic elements of a project are present, but some or all of the team members are geographically

Virtual project teams  Some or all of the team members are geographically separated.

ste24102_ch17_730-781.indd 761ste24102_ch17_730-781.indd 761 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

762 Chapter Seventeen Project Management

separated. Recent advances in communication technology have made this feasible. A key ben- efit is the ability to tap into human talents and perspectives that would otherwise be difficult or impossible to use. A key disadvantage can be the inability to realize synergies that can arise from closer contact among team members. Also, there are risks if there are language or cultural differences among team members, so communications have to be managed more carefully.

The existence of multiple projects can create added layers of pressure and complexity to project management. Resources often need to be shared across projects, and problems on one project may create issues for other projects, and can require reassessing priorities. When multiple projects are ongoing within an organization, resources needed for one project may be in use on another project, which could delay the project waiting for the resources to become available. Hence, it is important for managers to cross-check project schedules to avoid such conflicts. Project management software can help avoid conflicts when there are shared resources. In a related issue, project slippage can occur as a project nears completion if resources are transferred to new projects too quickly.

17.17 PROJECT MANAGEMENT SOFTWARE Technology has had a number of benefits for project management. Among those benefits are the use of computer-aided design (CAD) to produce updated prototypes on construction and product-development projects; software such as Lotus Notes to keep team members who are in separate locations in close contact; and the ability for remote viewing of projects, allowing those in different locations a firsthand view of progress and problems.

There are a variety of specialized software programs available to help manage projects. As an example, let’s consider Microsoft Project. 2 It can be used to effectively create schedules, estimate costs, and track progress. Users can

• Assign resources. Assign resources to tasks and adjust them as necessary.

• Compare project plan versions. Track version changes in project plans.

• Evaluate changes. Evaluate the impact of schedule and resources changes.

• Track performance. Track progress and monitor variances between target and actual project goals such as cost, start date, and finish date, and maintain historical records.

Microsoft Project facilitates communication by enabling users to share a project plan with others in the organization, generate predefined reports, format and print custom reports, and easily present project status.

Microsoft Project can be customized to accommodate specific needs by allowing choice of data to display in a project schedule, the custom fields, and modification of formulas, tool- bars, and reports. Microsoft Project is an integral part of the Microsoft Office System, making it easy to use products like Microsoft Office PowerPoint and Microsoft Office Visio to present project status.

There are many advantages to using a project management software package. Among them are the following:

• It imposes a methodology and a common project management terminology.

• It provides a logical planning structure.

• It can enhance communication among team members.

• It can flag the occurrence of constraint violations.

• It automatically formats reports.

• It can generate multiple levels of summary reports and detailed reports.

• It enables what-if scenarios.

• It can generate various chart types, including basic Gantt charts.

2 www.microsoft.com/office/project/prodinfo/standard/overview.mspx .

ste24102_ch17_730-781.indd 762ste24102_ch17_730-781.indd 762 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

Chapter Seventeen Project Management 763

One thing to keep in mind is that project management is more than choosing the right software. There is much that a project manager must do. Recall the key decisions that were discussed early in the chapter.

17.18 OPERATIONS STRATEGY

Projects can present both strategic opportunities and strategic risks, so it is critical for man- agement to devote adequate attention and resources to projects.

Projects are often used in situations that have some degree of uncertainty, which can result in delays, budget overruns, and failure to meet technical requirements. To minimize the impact of these possibilities, management must ensure that careful planning, wise selection of project managers and team members, and monitoring of the project occur.

Computer software and tools such as PERT can greatly assist project management. However, care must be taken to avoid focusing exclusively on the critical path. The obvious reason is that as the project progresses, other paths may become critical. But another, less obvious, reason is that key risk events may not be on the critical path. Even so, if they occur, they can have a major impact on the project.

It is not uncommon for projects to fail, either completely or partially. When that happens, it can be beneficial to examine the probable reasons for the failure, and decide what possible decisions or actions, if any, might have contributed to the failure. These become “lessons learned” that may be applicable to future projects to decrease the likelihood of failure.

17.19 RISK MANAGEMENT Risks are inherent in projects. They relate to the occurrence of events that can have undesir- able consequences, such as delays, increased costs, and an inability to meet technical specifi- cations. In some instances, there is the risk that events will occur that will cause a project to be terminated. Although careful planning can reduce risks, no amount of planning can eliminate chance events due to unforeseen, or uncontrollable, circumstances.

The probability of occurrence of risk events is highest near the beginning of a project and lowest near the end. However, the cost associated with risk events tends to be lowest near the beginning of a project and highest near the end. (See Figure 17.12 .)

Good risk management entails identifying as many potential risks as possible, analyzing and assessing those risks, working to minimize the probability of their occurrence, and estab- lishing contingency plans (and funds) for dealing with any that do occur. Much of this takes

LO17.11 Discuss the key steps in risk management.

FIGURE 17.12 Risk event probability and cost

Source:  Adapted from Clifford Gray and Erik W. Larson, Project Management: The Managerial Process, 4th ed., p. 198. Copyright © 2008 McGraw-Hill Companies, Inc. Used with permission.

Project life cycle

Cost to overcome occurrence of risk event

Probability of occurrence of a risk event

High

Low

ste24102_ch17_730-781.indd 763ste24102_ch17_730-781.indd 763 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

764 Chapter Seventeen Project Management

place before the start of a project, although it is not unusual for this process to be repeated during the project as experience grows and new information becomes available.

The first step is to identify the risks. Typically, there are numerous sources of risks, although the more experience an organization has with a particular type of work, the fewer and more identifiable the risks. Everyone associated with the project should have responsibility for the task of identifying risks. Brainstorming sessions and questionnaires can be useful in this regard.

Once risks have been identified, each risk must be evaluated to determine its probability of occurrence and the potential consequences if it does occur. Both quantitative and qualitative approaches have merit. Managers and workers can contribute to this effort, and experts might be called on. Experience with previous projects can be useful. Many tools might be applied, including scenario analysis, simulation, and PERT (described earlier in the chapter).

Risk reduction can take a number of forms. Much depends on the nature and scope of a project. “Redundant” (backup) systems can sometimes be used to reduce the risk of failure. For example, an emergency generator could supply power in the event of an electrical failure. Another approach is frequent monitoring of critical project dimensions with the goal of catching and eliminating problems in their early stages, before they cause extensive damage. Risks can sometimes be transferred, say by outsourcing a particular component of a project. Risk-sharing is another possibility. This might involve partnering, which can spread risks among partners; this approach may also reduce risk by enlarging the sphere of sources of ideas for reducing the risk.

A project leader may have to contend with multiple risks that have different costs and dif- ferent probabilities of occurring. A simple matrix such as the one illustrated in Figure 17.13 can be used to put the risks into perspective.

Events in the upper right-hand quadrant (events 3 and 4) have the highest probability of occurring, and also high costs. They should be given the greatest attention. Conversely, events in the lower left-hand quadrant (events 2 and 5) have relatively low probabilities and low costs, so they should be given the least attention. Events in the other two quadrants (events 6 and 1) should get moderate attention due either to high cost (event 6) or high probability of occurrence (event 1).

Event Probability Cost

1 .85 $18

2 .30 20

3 .55 68

4 .85 77

5 .10 30

6 .30 87

FIGURE 17.13 A risk matrix

1.000 0

25

50

75

$100

3

5

66

112

4

Probability of occurring

Cost

Projects are composed of a unique set of activities established to realize a given set of objectives in a limited time span. Projects go through a life cycle that involves definition, planning, execution, and delivery/termination. The nonroutine nature of project activities places a set of demands on the project manager that are different in many respects from those the manager of more routine operations activities experiences, both in planning and coordinating the work and in the human problems encountered. Ethi- cal conduct and risk management are among the key issues project managers must deal with.

PERT and CPM are two commonly used techniques for developing and monitoring projects. Although each technique was developed independently and for expressly different purposes, time and practice have erased most of the original differences, so that now there is little distinction between the two. Either provides the manager with a rational approach to project planning and a graphical display of project activities. Both depict the sequential relationships that exist among activities and reveal to managers which activities must be completed on time to achieve timely project completion. Managers can use that information to direct their attention toward the most critical activities.

SUMMARY

ste24102_ch17_730-781.indd 764ste24102_ch17_730-781.indd 764 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

Chapter Seventeen Project Management 765

1. Projects are unique, limited duration sets of tasks designed to accomplish a set of objectives.

2. The key project metrics are cost, time, and performance.

3. Table 17.1 and Figure 17.1 provide valuable insights into the nature of projects and project management.

4. The project manager and the project team can be major factors in achieving project goals.

5. Work breakdown structures, Gantt charts, and precedence diagrams are useful tools for managing projects.

KEY POINTS

activities, 741 activity-on-arrow (AOA), 740 activity-on-node (AON), 741 beta distribution, 751 CPM, 740 crash, 758 critical activities, 741 critical path, 741 deterministic, 743

events, 741 independence, 754 most likely time, 751 network (precedence) diagram, 740 optimistic time, 751 path, 741 PERT, 740 pessimistic time, 751

precedence diagram, 740 probabilistic, 743 project champion, 737 projects, 732 slack, 742 virtual project teams, 761 work breakdown structure (WBS), 739

KEY TERMS

Two slightly different conventions can be used for constructing a network diagram. One designates the arrows as activities; the other designates the nodes as activities.

The task of developing and updating project networks quickly becomes complex for projects of even moderate size, so computer software is important. Among the advantages of using project management software are the provision for a logical planning structure, enhanced communication, and automatically formatted charts and reports.

In some instances, it may be possible to shorten, or crash, the length of a project by shortening one or more of the project activities. Typically, such gains are achieved by the use of additional resources, although in some cases, it may be possible to transfer resources among project activities. Generally, projects are shortened to the point where the cost of additional reduction would exceed the benefit of additional reduction, or to a specified time.

SOLVED PROBLEMS

The following table contains information related to the major activities of a research project. Use the information to do the following:

a. Draw a precedence diagram using AOA.

b. Find the critical path.

c. Determine the expected length of the project.

Problem 1

Activity

Immediate Predecessor

Expected Time (days)

a — 5

c a 8

d c 2

b a 7

e — 3

f e 6

i b, d 10

m f, i 8

g — 1

h g 2

k h 17

end k, m

ste24102_ch17_730-781.indd 765ste24102_ch17_730-781.indd 765 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

766 Chapter Seventeen Project Management

a. In constructing networks, these observations can be useful. (1) Activities with no predecessors are at the beginning (left side) of the network. (2) Activities with multiple predecessors are located at path intersections.

Complete the diagram in sections. Go down the activity list in order to avoid overlooking any activities.

Solution

e 3

a 5

g 1

b 7

c 8

d 2

h 2

k 17

m 8

i 10

f 6

AOA diagram

g h k

S

End

a c

d

b

i

e f

m

Yes No

AON diagram

Here are some additional hints for constructing a precedence diagram.

(1) Use pencil.

(2) Start and end with a single node.

(3) Avoid having paths cross each other.

(4) Have activities go from left to right.

(5) Use only one arrow between any pair of nodes.

b. and c.

Path Length (days)

a-c-d-i-m * 5  �  8  �  2  �  10  �  8  �  33 †

a-b-i-m 5  �  7  �  10  �  8  �  30

e-f-m 3  �  6  �  8  �  17

g-h-k 1  �  2  �  17  �  20

*Critical path. † Expected project duration.

Using the computing algorithm, determine the slack times for the following AOA diagram. Identify the activities that are on the critical path.

Problem 2

ste24102_ch17_730-781.indd 766ste24102_ch17_730-781.indd 766 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

Chapter Seventeen Project Management 767

The task of determining ES, EF, LS, and LF times can be greatly simplified by setting up two brackets for each activity, as illustrated:

Solution

9

4

1

3

2

4

5

5

6

3

2

3

4 1

The bracket at the left of each activity will eventually be filled in with the earliest and latest start- ing times, and the bracket at the right end of each activity will be filled in with the earliest and latest finishing times:

LS ES

LF EF

This is accomplished in a two-step process. First, determine the earliest starting times and earliest finishing times, working from left to right, as shown in the following diagram.

9

4

1

3

2

4

5

5

6

3

2

4

10 0

4

0

9 9 14

14 17

4

6

ES

EF

Thus, activity 1-2 can start at 0. With a time of 4, it can finish at 0  �  4  �  4. This establishes the earliest start for all activities that begin at node 2. Hence, 2-5 and 2-4 can start no earlier than time 4. Activity 2-5 has an early finish of 4  �  6  �  10, and activity 2-4 has an early finish of 4  �  2  �  6. At this point, it is impossible to say what the earliest start is for 4-5; that will depend on which activity, 3-4 or 2-4, has the latest EF. Consequently, it is necessary to compute ES and EF along the lower path. Assuming an ES of 0 for activity 1-3, its EF will be 9, so activity 3-4 will have an ES of 9 and an EF of 9  � 5  �  14.

Considering that the two activities entering node 4 have EF times of 6 and 14, the earliest that activity 4-5 can start is the larger of these, which is 14. Hence, activity 4-5 has an ES of 14 and an EF of 14  �  3  �  17.

Now compare the EFs of the activities entering the final node. The larger of these, 17, is the expected project duration.

The LF and LS times for each activity can now be determined by working backward through the network (from right to left). The LF for the two activities entering node 5 is 17—the project dura- tion. In other words, to finish the project in 17 weeks, these last two activities must both finish by that time.

In the case of activity 4-5, the LS necessary for an LF of 17 is 17  �  3  �  14. This means that both activities 2-4 and 3-4 must finish no later than 14. Hence, their LF times are 14. Activity 3-4 has an LS time of 14  �  5  �  9, making the LF of activity 1-3 equal to 9, and its LS equal to 9  �  9  �  0.

ste24102_ch17_730-781.indd 767ste24102_ch17_730-781.indd 767 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

768 Chapter Seventeen Project Management

Activity 2-4, with an LF time of 14, has an LS time of 14  �  2  �  12. Activity 2-5 has an LF of 17 and therefore an LS of 17  �  6  �  11. Thus, the latest activity 2-5 can start is 11, and the latest 2-4 can start is 12 in order to finish by week 17. Since activity 1-2 precedes both of these activities, it can finish no later than the smaller of these, which is 11. Hence, activity 1-2 has an LF of 11 and an LS of 11  �  4  �  7.

The ES, EF, LF, and LS times are shown on the following network.

9

4

1

3

2

4

5

5

6

3

2

11 4

17 107

0

11 4

0 0 9

9 9 9

14 14

14 14

17 17

124

14 6

LS

LF

The slack time for any activity is the difference between either LF and EF or LS and ES. Thus,

Activity LS ES Slack or LF EF Slack

1-2 7 0 7 11 4 7

2-5 11 4 7 17 10 7

2-4 12 4 8 14 6 8

1-3 0 0 0 9 9 0

3-4 9 9 0 14 14 0

4-5 14 14 0 17 17 0

The activities with zero slack times indicate the critical path. In this case the critical path is 1-3-4-5. When working problems of this nature, keep in mind the following:

• The ES time for leaving activities of nodes with multiple entering activities is the largest EF of the entering activities.

• The LF for an entering activity for nodes with multiple leaving activities is the smallest LS of the leaving activities.

A path in a network has three activities. Their standard deviations are 1.50, 0.80, and 1.30. Find the path standard deviation.

Problem 3

Standard deviations cannot be added, but variances can be added. Square each standard deviation to obtain its variance, and then add the resulting variances to obtain the path variance:

Solution

Standard Deviation Variance

1.50 2.25

0.80 0.64

1.30 1.69

4.58 (path variance)

The square root of the path variance is the path standard deviation:

4.58 2.14 (path standard deviation)=

Expected times in weeks and variances for the major activities of an R&D project are depicted in the following table. Determine the probability that project completion time will be

a. 50 weeks or less.

b. More than 50 weeks.

Problem 4

ste24102_ch17_730-781.indd 768ste24102_ch17_730-781.indd 768 11/22/13 1:52 PM11/22/13 1:52 PM

Final PDF to printer

Chapter Seventeen Project Management 769

Path Activity Mean Variance

A 16 .69

Top B 11 .69

C 24 .11

D 5 0

Middle E 18 .25

F 26 .11

D 5 0

Bottom G 10 .25

H 14 .36

I 12 .11

Compute the mean and standard deviation for each path: Solution Path Expected Time (weeks) Standard Deviation (weeks)

Top 16  �  11  �  24  �  51 + + =.69 .69 .11 1.22

Middle 5  �  18  �  26  �  49 + + =.00 .25 .11 .60

Bottom 5  �  10  �  14  �  12  �  41 + + + =.00 .25 .36 .11 .85

a. Compute the z for each path for the length specified. For any path that has a z of � 3.00 or more, treat its probability of completion before the specified time as 1.00. Use

50 path

path z

t �

The probability that each path will be completed in 50 weeks or less is shown in the corre- sponding diagram. (Probabilities are from Appendix B, Table B.) The probability that the project will be completed in 50 weeks or less depends on all three paths being completed in that time. Because z for the bottom path is greater than � 3.00, it is treated as having a probability of com- pletion in 50 weeks of 100 percent. It is less certain that the other two paths will be completed in that time. The probability that both will not exceed 50 is the product of their individual prob- abilities of completion. Thus, .2061(.9525)(1.00)  �  .1963.

b. The probability that the project will exceed 50 weeks is the complement of this number, which is 1.000  �  .1963  �  .8037. (Note that it is not the product of the path probabilities.)

.2061

–.82

50

0

51

z scale

Weeks

z =

T = 50 weeks

50 – 51 1.22

= –.82

z = 50 – 49 .60

= 1.67

z = 50 – 41 .85

= 10.59

0

49

z scale

Weeks

1.67

50

0

41 10.59

50

z scale

Weeks

.9525

100%

ste24102_ch17_730-781.indd 769ste24102_ch17_730-781.indd 769 11/22/13 1:53 PM11/22/13 1:53 PM

Final PDF to printer

770 Chapter Seventeen Project Management

Costs for a project are $12,000 per week for as long as the project lasts. The project manager has supplied the cost and time information shown. Use the information to

a. Determine an optimum crashing plan.

b. Graph the total costs for the plan.

Problem 5

Activity

Crashing Potential (weeks)

Cost per Week to Crash

a 3 $11,000

b 3 3,000 first week,

$4,000 others

c 2 6,000

d 1 1,000

e 3 6,000

f 1 2,000

Path Activity Cost per Week to Crash

a-b b $ 4,000

a 11,000

e-f f 2,000

e 6,000

Path Duration (weeks)

a-b 24 (critical path)

c-d 19

e-f 23

Activity Cost per Week to Crash

b $ 3,000

a 11,000

13 weeks c

10 we

eks

a

15 weekse

6 weeks d

8 w eek

s

f

14 weeksb

a. (1) Compute path lengths and identify the critical path: Solution

(2) Rank critical activities according to crash costs:

Activity b should be shortened one week since it has the lower crashing cost. This would reduce indirect costs by $12,000 at a cost of $3,000, for a net savings of $9,000. At this point, paths a-b and e-f would both have a length of 23 weeks, so both would be critical.

(3) Rank activities by crashing costs on the two critical paths:

Choose one activity (the least costly) on each path to crash: b on a-b and f on e-f, for a total cost of $4,000  �  $2,000  �  $6,000 and a net savings of $12,000  �  $6,000  �  $6,000.

(4) Check to see which path(s) might be critical: a-b and e-f would be 22 weeks in length, and c-d would still be 19 weeks.

ste24102_ch17_730-781.indd 770ste24102_ch17_730-781.indd 770 11/22/13 1:53 PM11/22/13 1:53 PM

Final PDF to printer

Chapter Seventeen Project Management 771

Path  n   �   0 1 2 3

a-b 24 23 22 21

c-d 19 19 19 19

e-f 23 23 22 21

Activity crashed b b,f b,e

Crashing costs ($000) 3 6 10

Path Activity Cost per Week to Crash

a-b b $ 4,000

a 11,000

e-f e 6,000

f (no further crashing possible)

Project Length

Cumulative Weeks

Shortened

Cumulative Crashing

Costs ($000) Indirect

Costs ($000) Total

Costs ($000)

24 0 0 24(12)  �  288 288

23 1 3 23(12)  �  276 279

22 2 3  �  6  �  9 22(12)  �  264 273

21 3 9  �  10  �  19 21(12)  �  252 271

20 4 19  �  17  �  36 20(12)  �  240 276

290

280

270

260

Project duration (weeks)

T o

ta l c

o st

20 21 22 23 24

276

271 273

279

288

0

Crash

(5) Rank activities on the critical paths:

Crash b on path a-b and e on e-f for a cost of $4,000  �  $6,000  �  $10,000, for a net savings of $12,000  �  $10,000  �  $2,000.

(6) At this point, no further improvement is possible: paths a-b and e-f would be 21 weeks in length, and one activity from each path would have to be shortened. This would mean activ- ity a at $11,000 and e at $6,000 for a total of $17,000, which exceeds the $12,000 potential savings in costs.

b. The following table summarizes the results, showing the length of the project after crashing n weeks:

A summary of costs for the preceding schedule would look like this:

The graph of total costs is as follows:

ste24102_ch17_730-781.indd 771ste24102_ch17_730-781.indd 771 11/22/13 1:53 PM11/22/13 1:53 PM

Final PDF to printer

772 Chapter Seventeen Project Management

1. A project manager may need two skill sets—those of a manager and those of a leader. Explain.

2. Explain the term project champion and list some ways to keep a champion involved with the project.

3. List the steps in risk management.

4. Give some examples of ethical issues that may arise on projects. What can a project manager do to minimize such issues?

5. What are the key advantages of using project management software?

6. What is a work breakdown structure, and how is it useful for project planning?

7. Identify the term being described for each of the following: a. A sequence of activities in a project. b. The longest time sequence of activities in a project. c. Used when two activities have the same starting and finishing points. d. The difference in time length of any path and the critical path. e. The statistical distribution used to describe variability of an activity time. f. The statistical distribution used to describe path variability. g. Shortening an activity by allocating additional resources.

8. List the main advantages of PERT. List the main limitations.

9. Why might a probabilistic estimate of a project’s completion time based solely on the variance of the critical path be misleading? Under what circumstances would it be acceptable?

10. Define each of these terms, and indicate how each is determined. a. Expected activity time. b. Variance of an activity time. c. Standard deviation of a path’s time.

11. Why might a person wish to be involved with a critical path activity? What are some of the rea- sons one might have for not wanting this association?

12. What are some of the potential benefits of working on a special project in one’s firm? What are some of the risks?

13. What are some aspects of the project manager’s job that make it more demanding than the job of a manager working in a more routine organizational framework?

14. What is the main benefit of a project organization over more traditional forms of operations management for project work?

DISCUSSION AND REVIEW QUESTIONS

1. Project management techniques have been used successfully for a wide variety of efforts, including the many NASA space missions, huge construction projects, implementation of major systems such as ERP, production of movies, development of new products and services, theatrical productions, and much more. Why not use them for managing the operations function of any business?

2. Give three examples of unethical conduct involving projects and the ethical principle each one violates.

CRITICAL THINKING EXERCISES

1. For each of the following network diagrams, determine both the critical path and the expected project duration. The numbers on the arrows represent expected activity times.

a. AOA diagram

PROBLEMS

1. What trade-offs are associated with time and cost estimates for a proposed project?

2. Who needs to be involved in assessing the cost of a project?

3. Name and explain briefly two ways that technology has had an impact on project management.

TAKING STOCK

2

4 7

2

5 8

4 6 9

102

113

12 1

5

7

9

8

6

10

4 3

5

6

ste24102_ch17_730-781.indd 772ste24102_ch17_730-781.indd 772 11/29/13 1:09 AM11/29/13 1:09 AM

Final PDF to printer

Chapter Seventeen Project Management 773

A

B

C F

EStart

G

End

D

7 8

3

5 7 6

4

b. AON diagram

c. AOA diagram

d. AON diagram

1

14

133

10

4

13

15

6

10

3

7

11 14

8

4 7

6

2 5

7 14

8

13 161 3

4

12

6

9

10 11

15

2. Chris received new word processing software for her birthday. She also received a check, with which she intends to purchase a new computer. Chris’s college instructor assigned a paper due next week. Chris decided that she will prepare the paper on the new computer. She made a list of the activities she will need to do and their estimated times. a. Arrange the activities into two logical sequences. b. (1) Construct an AOA network diagram. (2) Construct an AON diagram. c. Determine the critical path and the expected duration time.

2

4

3

5

7

6

1

8 9

18

3

13

10

11

4

5

9 2

ste24102_ch17_730-781.indd 773ste24102_ch17_730-781.indd 773 11/22/13 1:53 PM11/22/13 1:53 PM

Final PDF to printer

774 Chapter Seventeen Project Management

d. What are some possible reasons for the project to take longer than the expected duration?

Estimated Time (hrs.) Activity (abbreviation)

0.8 Install software (Inst)

0.4 Outline the paper (Out)

0.2 Submit paper to instructor (Sub)

0.6 Choose a topic (Ch)

0.5 Use grammar-checking routine and make corrections (Ck)

3.0 Write the paper using the word-processing software (Write)

2.0 Shop for a new computer (Sh)

1.0 Select and purchase computer (Sel)

2.0 Do library research on chosen topic (Lib)

3. Prepare a Gantt chart for each of the following in the style of the chart shown on p. 739. a. The bank location problem (see Figure 17.4 , p. 741). Hint: Use the early start (ES) times given

in Table 17.3 on p. 751. b. Solved Problem number 2 on pp. 766–768.

4. a. Develop a list of activities and their immediate predecessors similar to the lists in this problem for this diagram:

A

C

B

F

E

b. Construct an activity-on-arrow precedence diagram for each of the following cases. Note that each case requires the use of a dummy activity.

c. Construct an AON diagram for each case.

(1) Activity Immediate

Predecessor (2) Activity Immediate

Predecessor

A — J —

B — K —

C — L J

D A M L

E B N J

F B P N

G C Q —

H F R K

I F, G S Q

K D, E V R, S, T

End H, I, K T Q

W T

End M, P, V, W

5. For each of the problems listed, determine the following quantities for each activity: the earliest start time, latest start time, earliest finish time, latest finish time, and slack time. List the critical activities, and determine the expected duration of the project. a. Problem 1 a. b. Problem 1 b.

ste24102_ch17_730-781.indd 774ste24102_ch17_730-781.indd 774 11/22/13 1:53 PM11/22/13 1:53 PM

Final PDF to printer

Chapter Seventeen Project Management 775

6. Reconsider the network diagram of Problem 1 a. Suppose that after 12 weeks, activities 1-2, 1-3, and 2-4 have been finished; activity 2-5 is 75 percent finished; and activity 3-6 is half finished. How many weeks after the original start time should the project be finished?

7. Three recent college graduates have formed a partnership and have opened an advertising firm. Their first project consists of activities listed in the following table. a. Draw the precedence diagram. b. What is the probability that the project can be completed in 24 days or less? In 21 days or less? c. Suppose it is now the end of the seventh day and that activities A and B have been completed

while activity D is 50 percent completed. Time estimates for the completion of activity D are 5, 6, and 7. Activities C and H are ready to begin. Determine the probability of finishing the proj- ect by day 24 and the probability of finishing by day 21.

Activity First Crash Second Crash

C $8 $10

D 10 11

E 9 10

F 7 9

G 8 9

H 7 8

I 6 8

Path Expected Duration

(weeks) Variance

A 10 1.21

B 8 2.00

C 12 1.00

D 15 2.89

E 14 1.44

TIME IN DAYS

Activity Immediate

Predecessor Optimistic Most Likely Pessimistic

A — 5 6 7

B — 8 8 11

C A 6 8 11

D — 9 12 15

E C 5 6 9

F D 5 6 7

G F 2 3 7

H B 4 4 5

I H 5 7 8

End E, G, I

d. The partners have decided that shortening the project by two days would be beneficial, as long as it doesn’t cost more than about $20,000. They have estimated the daily crashing costs for each activity in thousands, as shown in the following table. Which activities should be crashed, and what further analysis would they probably want to do?

8. The new director of special events at a large university has decided to completely revamp gradu- ation ceremonies. Toward that end, a PERT chart of the major activities has been developed. The chart has five paths with expected completion times and variances as shown in the table. Graduation day is 16 weeks from now. Assuming the project begins now, what is the probability that the project will be completed before a. Graduation time? b. The end of week 15? c. The end of week 13?

ste24102_ch17_730-781.indd 775ste24102_ch17_730-781.indd 775 11/22/13 1:53 PM11/22/13 1:53 PM

Final PDF to printer

776 Chapter Seventeen Project Management

Path Activity Estimated Time

(weeks) Standard

Deviation (wks.)

A C 4 0.70

D 6 0.90

B E 3 0.62

F 9 1.90

Path Activity Mean Standard Deviation

A C 5 1.3

D 4 1.0

B E 8 1.6

9-10-12

8-8-8

3 8

5

1 2 5-6-7

4

8-10-14 6 11

7-10-12

7

10 -1

1- 12

9

10

6- 6-

6

10 .5-

13 -15

.5

5-7-10

14- 18-

26

13-13-1310-12-14

11 -1

2- 13

9. Construct a network diagram for the information in the following table. Use either AOA or AON (see Example 5 for either type). What is the probability that the project will take more than 10 weeks to complete if the activity means and standard deviations are as shown below? Times are in weeks.

10. The project described in the following table is scheduled to be completed in 11 weeks. Construct a network diagram using AOA or AON (see Example 5 for either type). Then answer the following questions: a. If you were the manager of this project, would you be concerned? Explain. b. If there is a penalty of $5,000 a week for each week the project is late, what is the probability

of incurring a penalty of at least $5,000?

11. The following precedence diagram reflects three time estimates in weeks for each activity. Determine: a. The expected completion time for each path and its variance. b. The probability that the project will require more than 49 weeks. c. The probability that the project can be completed in 46 weeks or less.

12. A project manager has compiled a list of major activities that will be required to install a computer information system in her firm. The list includes estimated completion times for activities and pre- cedence relationships.

Activity Immediate

Predecessor Estimated

Times (weeks)

A — 2-4-6

D A 6-8-10

E D 7-9-12

H E 2-3-5

F A 3-4-8

G F 5-7-9

ste24102_ch17_730-781.indd 776ste24102_ch17_730-781.indd 776 11/22/13 1:53 PM11/22/13 1:53 PM

Final PDF to printer

Chapter Seventeen Project Management 777

Path Activity Duration (weeks) First Crash Second Crash

Top A 5 $8 $10

B 6 7 9

C 3 14 15

Middle D 3 9 11

E 7 8 9

C 3 14 15

Bottom F 5 10 15

G 5 11 13

H 5 12 14

Activity Immediate

Predecessor Estimated

Times (weeks)

B — 2-2-3

I B 2-3-6

J I 3-4-5

K J 4-5-8

C — 5-8-12

M C 1-1-1

N M 6-7-11

O N 8-9-13

End H, G, K, O

a. Construct a network diagram. You can use either AOA or AON (see Example 5). b. If the project is finished within 26 weeks of its start, the project manager will receive a bonus

of $1,000; and if the project is finished within 27 weeks of its start, the bonus will be $500. Find the probability of each bonus.

13. Here is a list of activity times for a project as well as crashing costs for its activities. Determine which activities should be crashed and the total cost of crashing if the goal is to shorten the project by three weeks as cheaply as possible. First construct a network diagram. You can use either an AOA or an AON (see Example 5).

14. The project manager of a task force planning the construction of a domed stadium had hoped to be able to complete construction prior to the start of the next college football season. After reviewing construction time estimates, it now appears that a certain amount of crashing will be needed to ensure project completion before the season opener. Given the following time and cost estimates, determine a minimum-cost crashing schedule that will shave five weeks off the project length. Note: No activity can be crashed more than two weeks.

CRASHING COSTS ($000)

Activity Immediate Predecessor Normal Time (weeks) First Week Second Week

A — 12 $15 $20

B A 14 10 10

C — 10 5 5

D C 17 20 21

E C 18 16 18

F C 12 12 15

G D 15 24 24

H E 8 — —

I F 7 30 —

J I 12 25 25

K B 9 10 10

M G 3 — —

N H 11 40 —

P H, J 8 20 20

End K, M, N, P

ste24102_ch17_730-781.indd 777ste24102_ch17_730-781.indd 777 11/22/13 1:53 PM11/22/13 1:53 PM

Final PDF to printer

778 Chapter Seventeen Project Management

CRASHING COSTS ($000)

Activity First Week Second Week Third Week

1-2 $18 $22 $ —

2-5 24 25 25

5-7 30 30 35

7-11 15 20 —

11-13 30 33 36

1-3 12 24 26

3-8 — — —

8-11 40 40 40

3-9 3 10 12

9-12 2 7 10

12-13 26 — —

1-4 10 15 25

4-6 8 13 —

6-10 5 12 —

10-12 14 15 —

CRASHING COSTS

Activity Immediate Predecessor Normal Time (weeks) 1st Week 2nd Week

K — 9 $410 $415

L K 7 125 —

N K 5 45 45

M L 4 300 350

J N 6 50 —

Q J, M 5 200 225

P Q 8 — —

Y Q 7 85 90

Z P 6 90 —

End Y, Z

4 1

2

4

5

3

8

6 10

7

9

11

1 12

13

6

7

12 9

5

3

8

12

5

4

8

11

9

15. A construction project has indirect costs totaling $40,000 per week. Major activities in the project and their expected times in weeks are shown in this precedence diagram:

Crashing costs for each activity are

a. Determine the optimum time–cost crashing plan. b. Plot the total-cost curve that describes the least expensive crashing schedule that will reduce

the project length by six weeks.

16. Chuck’s Custom Boats (CCB) builds luxury yachts to customer order. CCB has landed a contract with a mysterious New York lawyer (Mr. T). Relevant data are shown on the next page. The com- plication is that Mr. T wants delivery in 32 weeks or he will impose a penalty of $375 for each week his yacht is late. Note: No activity can be crashed more than two weeks.

Develop a crashing schedule.

ste24102_ch17_730-781.indd 778ste24102_ch17_730-781.indd 778 11/22/13 1:53 PM11/22/13 1:53 PM

Final PDF to printer

Chapter Seventeen Project Management 779

Event Probability Cost ($000)

1 .25 15

2 .35 25

3 .20 55

4 .80 10

5 .10 77

6 .40 55

7 .60 50

Event Cost ($000) Probability

Equipment breakdown 40 .20

Vendor is late with key segment 200 .60

Subcontractor has labor issues 140 .30

Weather problems 15 Unknown

Funding delays 50 .40 to .60

Testing delays 20 .40

Path Activity Time Estimates

A 4-5-6

Top B 7-8-10

C 3-5-9

D 7-8-11

Bottom E 2-3-4

F 1-4-6

17. Given the following table, construct a network diagram, either AOA or AON. Times are in days. a. Determine the expected duration of the project. b. Compute the probability that the project will take at least 18 days.

18. Create a risk matrix in the style of Figure 17.13 for this project. Use a vertical scale of $0 to $80. Which event should the project manager be most concerned about?

19. Create a risk matrix for this project:

Explain your reasoning for your placement of the events Weather problems and Funding delays.

“The mission of the project which you will head is to get our new Mexi- can subsidiary ready for take-over by Mexican managers. My hope is that you will be able to do this in about two years,” explained Robert Linderman, president of Linderman Industries, Inc., to Carl Conway, newly appointed manager for “Operation Mexicano.” Conway had been hired specifically for this assignment because of his experience in man- aging large defense projects in the aerospace industry.

“The first thing that I will have to do is put a project team together,” said Conway. “I imagine that you have in mind my drawing people from the functional divisions.”

“Yes, I have already sent memoranda to the division managers inform- ing them that you will be asking for some of their key people to work

under you for about two years,” said Linderman. “In addition, I have advised them to be prepared to process work orders from Operation Mexicano with the personnel and equipment of their organizations. Later on in the project’s life, you will begin to get Mexican personnel, both managers and technicians, in to your organization. These people will have Mexican supervisors, but until the mission is accomplished, they also will report to you. I will have to admit that you are going to have some complex authority relationships, especially as you personally will be responsible to the president of the subsidiary, Felix Delgado, as well as to me.”

Conway began to make his plans for the project team. The plant building was available and empty in Mexico City, and it was important

CASE The Case of the Mexican Crazy Quilt

(continued)

ste24102_ch17_730-781.indd 779ste24102_ch17_730-781.indd 779 11/22/13 1:53 PM11/22/13 1:53 PM

Final PDF to printer

780 Chapter Seventeen Project Management

to get equipment purchased and installed as soon as possible. A plant layout would have to be prepared, but before that could be done there would have to be a manufacturing plan. Therefore, he needed to recruit an industrial engineer, a production planner, and an equipment buyer. They, in turn, would have to build their own staffs.

He made an appointment with Sam Sargis, corporate manager of industrial engineering. “I have had a preliminary talk with Bob Cates about his joining Operation Mexicano, and he is quite interested,” Carl said. “Will you release him to me?”

“Why, I’m grooming Cates to take over my job when I retire,” replied Sargis. “He is my best man. Let me pick someone else for you, or better still, you just tell me what industrial engineering work you want done, and I will have it done for you.”

“Sorry, I want Cates,” said Carl firmly. “And besides, you are not due to retire for five years. This will be good experience for him.”

For production planning, Carl had in mind Bert Mill, an older man with extensive experience in managing production operations, but Mill rejected his offer. “I talked it over with my wife,” he said, “and we feel that at my age I shouldn’t take a chance on not having a job to come back to when Operation Mexicano is finished.”

Carl next talked to Emil Banowetz, who was assistant to Jim Burke, the vice president for manufacturing, and Banowetz decided that he would like to join the project team. However, Burke told Conway that if Banowetz were forcibly taken away from him, he would give Mr. Linder- man his resignation, so Carl decided to back down. He finally accepted a man that Burke recommended.

Filling the equipment buyer’s slot was easy. The director of procure- ment phoned Carl and said that a senior buyer, Humberto Guzman, had requested permission to ask for the assignment, and that he strongly recommended him. Guzman has been purchasing agent for a large min- ing company in Mexico for about 10 years.

Carl had about the same experiences in getting the people he wanted for the functions of engineering, quality control, cost, marketing, and advertising as he did for the first three positions; in other words, he won some confrontations with the division managers and lost some. For personnel, he got Dr. Juan Perez, who was slated to be person- nel director of the subsidiary company, to affiliate temporarily with the project team.

The first brush that Project Mexicano had in getting a functional division to do work for it came when Carl’s engineering man, Frank Fong, reported to him that the engineering vice president, who was formerly Fong’s boss, refused to authorize top priority to the chang- ing of dimensions in the production drawings to the metric system. Carl had to take this issue to Linderman, who ruled in his favor. The defeated vice president, of course, did not take kindly to the decision.

The next incident revolved around Carl’s desire to have a pilot run of products made with metric measurements for shipment to Mexico. The purpose was to test the market acceptance of the Linderman articles. Jim Burke stated flatly that there was no way that his pro- duction workers could be trained to work with metric drawings. Carl quickly saw that this was an issue that he was not going to win, so he had his buyer, Guzman, work with the newly appointed manufacturing

manager for the subsidiary in getting a run of the products subcon- tracted in Mexico City.

Bob Cates made a special trip from Mexico City to present Carl with an interesting problem. The Mexican industrial engineer, whom Bob was supposed to be training, had his own ideas about plant layout. When they differed from Bob’s as they usually did, he would take his com- plaint directly to Felix Delgado, the president of the Mexican subsidiary. Because Delgado’s competence was primarily in finance, he would not know how to decide the argument and would simply table it. Carl took examples of some of the disagreements to Bob’s former boss, Sam Sar- gis, who quite unexpectedly ruled against Bob’s proposed methods. Carl saw that there was bad feeling by Sargis against Bob for leaving his department, which boded ill for Bob’s return. To solve the immediate problem, however, Carl asked Dr. Perez to try to reconcile the situation in Mexico City.

Despite these problems, and many more of a similar nature, Project Mexicano was successful, and the transition to Mexican management was made in just a little over two years. By a curious twist, through Dr. Perez’s intercession Felix Delgado became very impressed by Bob Cates and convinced him to accept the job of director of industrial engi- neering for the Mexican company. Humberto Guzman also stayed on to head the procurement operation.

Other members of the project team were not so fortunate. Linder- man Industries was laying off personnel when the project ended, and only the project production man was able to get a job in the company at as high a level as the one he had when he joined the team. The cost expert elected to leave Linderman because he said the glamour of Proj- ect Mexicano had spoiled him for any routine job.

Carl Conway had a difficult decision of his own to make. Robert Lin- derman said that he was extremely pleased with his performance and that something good would open up in the company for him soon. In the meantime, there was a staff assignment available for him. Carl had seen enough project managers in the aerospace industry who had figu- ratively rotted on staff assignments when their projects were completed to be somewhat wary.

Questions

1. Was Linderman Industries’ adoption of project organization an appropriate one for getting the Mexican subsidiary started?

2. In consideration of Robert Linderman’s letting the division managers know that the project manager would be asking for some of their key people, why would Conway have any difficulty in getting the ones he wanted?

3. Would you expect that many people would turn down a chance to join a project organization, as Bert Mill did?

4. Why would Conway take his problem with the engineering vice president to Linderman and have it resolved in his favor, yet back down in two disputes with the manufacturing vice president?

5. What could Linderman Industries have done to assure good jobs for the people coming off Project Mexicano, including Carl Conway, the project manager?

Source: Clayton Reeser and Marvin Loper, Management: The Key to Organiza- tional Effectiveness, rev. ed. Copyright © 1978.

ste24102_ch17_730-781.indd 780ste24102_ch17_730-781.indd 780 11/22/13 1:53 PM11/22/13 1:53 PM

Final PDF to printer

Chapter Seventeen Project Management 781

Chatfield, Carl, and Timothy D. Johnson. Microsoft Project (2013) Step by Step. Redmond, WA: Microsoft Press, 2013.

Goldratt, Eliyahu. Critical Chain. Great Barrington, MA: North River Press, 1997.

HBR Guide to Project Management. Watertown, MA: Harvard Business School Publishing Corporation, 2012.

Heagney, Joseph. Fundamentals of Project Management. 4 th ed. New York: American Management Association, 2012.

Heldman, Kim. Project Management Jump Start. 3 rd ed. New York: Wiley, 2011.

Horine, Gregory M. Project Management: Absolute Beginner’s Guide. 3 rd ed. Indianapolis: Que Publishing, 2013.

Project Management Body of Knowledge, 5 th ed. [A Guide to the Project Management Body of Knowledge]: PMBOK(R) Guide by Project Management Institute. Newtown Square, PA: Proj- ect Management Institute, 2013.

Wysoki, Robert K. Effective Project Management: Traditional, Agile, Extreme. 6 th ed. New York: Wiley, 2012.

SELECTED BIBLIOGRAPHY AND FURTHER

READINGS

B. “Smitty” Smith is a project manager for a large consumer electronics corporation. Although she has been with the company only four years, she has demonstrated an uncanny ability to bring projects in on time, meet technical specifications, and be close to budget. Her latest assignment is a project that will involve merging two existing technologies. She and her team have almost finished developing the proposal that will be presented to a management committee for approval. All that remains to be done is to develop a time estimate for the project. The team has to construct a network diagram for the project. It has three paths. The expected dura- tions and standard deviations for the paths are listed in the following table.

What project durations (in weeks) should Smitty include in the proposal for these risks of not delivering the project on time: 5 percent, 10 per- cent, 15 percent? What are the pros and cons of quoting project times aggressively? Conservatively?

CASE Time, Please

Path Expected Duration

(weeks) Standard Deviation

A 10 4

B 14 2

C 13 2

ste24102_ch17_730-781.indd 781ste24102_ch17_730-781.indd 781 11/29/13 1:10 AM11/29/13 1:10 AM

Final PDF to printer

782

C H A P T E R

18

After completing this chapter, you should be familiar with waiting line terminology, be able to solve typical problems using the models presented in this chapter, and answer these questions:

LO18.1 What imbalance does the existence of a waiting line reveal?

LO18.2 What causes waiting lines to form, and why is it impossible to eliminate them completely?

LO18.3 What metrics are used to help managers analyze waiting lines?

LO18.4 What very important lesson does the constant service time model provide for managers?

LO18.5 What are some psychological approaches to managing waiting lines, and why might a manager want to use them?

Management of Waiting Lines

CHAPTER OUTLINE

18.1 Why Is There Waiting? 784

18.2 Managerial Implications of Waiting Lines, 785

18.3 Goal of Waiting-Line Management, 785

18.4 Characteristics of Waiting Lines, 786 Population Source, 786

Number of Servers (Channels), 787

Arrival and Service Patterns, 788

Queue Discipline, 789

18.5 Measures of Waiting-Line Performance, 790

18.6 Queuing Models: Infinite-Source, 790 Basic Relationships, 791

Single Server, Exponential Service Time, M/M/1, 793

Single Server, Constant Service Time, M/D/1, 794

Multiple Servers, M/M/S, 795

Cost Analysis, 799

Maximum Line Length, 801

Multiple Priorities, 802

18.7 Queuing Model: Finite-Source, 805

18.8 Constraint Management, 810

18.9 The Psychology of Waiting, 811

18.10 Operations Strategy, 812

Case: Big Bank, 819

LEARNING OBJECTIVES

ste24102_ch18_782-821.indd 782ste24102_ch18_782-821.indd 782 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

783

The mission of Walt Disney theme parks is to “make people happy,” and the folks at Disney World in Orlando are masters at doing that. They realize that waiting in lines at attractions does not add to the enjoyment of their customers. They also realize that customers waiting in lines are not generating the revenue that they would if they visited restaurants and sou- venir shops. Hence, they have several reasons for wanting to reduce waiting times. Lately they have been using a reservation system called FastPass at some attractions that allow customers to reserve visit times instead of having to wait in line. This is a win-win solution: Customers are happier because they don’t have to wait in line, and the park’s potential for additional revenue is increased. You will learn more about Disney’s approaches to waiting lines later in the chapter.

Waiting lines occur when there is a temporary imbalance between supply (capacity) and demand. Waiting lines add to the cost of operation and they reflect negatively on customer service, so it is important to balance the cost of having customers wait with the cost of providing service capacity. Customer waiting lines occur when there is too little capacity to handle demand, but having more capacity than what is needed to handle demand means that there is idle (unproductive) capacity. From a managerial perspective, the key is to determine the balance that will provide an adequate level of service at a reasonable cost.

Waiting lines abound in all sorts of service systems. They are non-valued-added occur- rences. In lean systems, waiting is one of the seven wastes. For customers, having to wait for service can range from being acceptable (usually short waits), to being annoying (longer waits), to being a matter of life and death (e.g., in emergencies). For businesses, the costs of waiting come from lower productivity and competitive disadvantage. For society, the costs are wasted resources (e.g., fuel consumption of cars stuck in traffic) and reduced quality of life. Hence, it is important for system designers and managers of existing service systems to fully appreciate the impact of waiting lines.

Designers must weigh the cost of providing a given level of service capacity against the potential (implicit) cost of having customers wait for service. This planning and analysis of

LO18.1 What imbalance does the existence of a waiting line reveal?

ste24102_ch18_782-821.indd 783ste24102_ch18_782-821.indd 783 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

784 Chapter Eighteen Management of Waiting Lines

service capacity frequently lends itself to queuing theory, which is a mathematical approach to the analysis of waiting lines. Queuing theory is directly applicable to a wide range of service operations, including call centers, banks, post offices, restaurants, theme parks, tele- communications systems, and traffic management.

The foundation of modern queuing theory is based on studies about automatic dialing equipment made in the early part of the 20th century by Danish telephone engineer A. K. Erlang. Prior to World War II, very few attempts were made to apply queuing theory to business prob- lems. Since that time, queuing theory has been applied to a wide range of problems.

The mathematics of queuing can be complex; for that reason, the emphasis here will not be on the mathematics but on the concepts that underlie the use of queuing in analyzing waiting- line problems. We shall rely on the use of formulas and tables for analysis.

Waiting lines are commonly found wherever customers arrive randomly for services. Some examples of waiting lines we encounter in our daily lives include the lines at supermarket checkouts, fast-food restaurants, airport ticket counters, theaters, post offices, and toll booths. In many situations, the “customers” are not people but orders waiting to be filled, trucks wait- ing to be unloaded, jobs waiting to be processed, or equipment awaiting repairs. Still other examples include ships waiting to dock, planes waiting to land, and cars waiting at a stop sign.

One reason that queuing analysis is important is that customers regard waiting negatively. Customers may tend to associate this with poor service quality, especially if the wait is long. Similarly, in an organizational setting, having work or employees wait is the sort of waste that workers in lean systems strive to reduce.

The discussion of queuing begins with an examination of what is perhaps the most funda- mental issue in waiting-line theory: Why is there waiting?

18.1 WHY IS THERE WAITING? Many people are surprised to learn that waiting lines tend to form even though a system is basically underloaded. For example, a fast-food restaurant may have the capacity to handle an average of 200 orders per hour and yet experience waiting lines even though the average number of orders is only 150 per hour. The key word is average. In reality, customers arrive at random intervals rather than at evenly spaced intervals, and some orders take longer to fill than others. In other words, both arrivals and service times exhibit a high degree of variability. And because services cannot be performed ahead of time and stored until needed, the system at times becomes temporarily overloaded, giving rise to waiting lines. However, at other times, the system is idle because there are no customers. It follows that in systems where variability is minimal or nonexistent (e.g., because arrivals can be scheduled and service time is constant), waiting lines do not ordinarily form. JIT/lean systems strive to achieve this.

Queuing theory  Mathematical approach to the analysis of waiting lines.

LO18.2 What causes waiting lines to form, and why is it impossible to eliminate them completely?

Passengers wait to buy tickets at Termini train station in Rome. As one of the largest railway stations in Europe, Termini serves over 150 million passengers each year, connecting Rome to most of Italy and some European destinations.

ste24102_ch18_782-821.indd 784ste24102_ch18_782-821.indd 784 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 785

18.2 MANAGERIAL IMPLICATIONS OF WAITING LINES Managers have a number of very good reasons to be concerned with waiting lines. Chief among those reasons are the following:

1. The cost to provide waiting space.

2. A possible loss of business should customers leave the line before being served or refuse to wait at all.

3. A possible loss of goodwill.

4. A possible reduction in customer satisfaction.

5. The resulting congestion that may disrupt other business operations and/or customers.

18.3 GOAL OF WAITING-LINE MANAGEMENT In a queuing system, customers enter a waiting line of a service facility, receive service when their turn comes, and then leave the system. The number of customers in the system (awaiting service or being served) will vary randomly over time. The goal of waiting-line management is essentially to minimize total costs. There are two basic categories of cost in a queuing situ- ation: those associated with customers waiting for service and those associated with capacity. Thus,

TC Customer waiting cost Capacity cost� �

Capacity costs are the costs of maintaining the ability to provide service. Examples include the number of bays at a car wash, the number of checkouts at a supermarket, the number of repair people to handle equipment breakdowns, and the number of lanes on a highway. When a service facility is idle, capacity is lost since it cannot be stored. The costs of customer wait- ing include the salaries paid to employees while they wait for service (mechanics waiting for tools, the drivers of trucks waiting to unload), the cost of the space for waiting (size of doctor’s waiting room, length of driveway at a car wash, fuel consumed by planes waiting to land), and any loss of business due to customers refusing to wait and possibly going elsewhere in the future.

A practical difficulty frequently encountered is pinning down the cost of customer wait- ing time, especially since major portions of that cost are not a part of accounting data. One approach often used is to treat waiting times or line lengths as a policy variable: A manager simply specifies an acceptable level of waiting and directs that capacity be established to achieve that level.

The goal of waiting-line management is to balance the cost of providing a level of service capacity with the cost of customers waiting for service. Figure 18.1 illustrates this concept. Note that as capacity increases, its cost increases. For simplicity, the increase is shown as a linear relationship. Although a step function is often more appropriate, use of a straight line

Source: ItsaSurvey.com ( www.itsasurvey.com/artman2/ publish/consumers/Americans_Do_Not_Like_ Waiting_in_Line_They_Like_Credit_Cards_for_ Faster_Purchases.shtml ).

According to a new Visa survey conducted with 1,000 adults standing in lines throughout New York City, most consumers would actually prefer to clean their bathroom (42 percent), sit in traffic (20 percent) or go to the dentist (18 percent) than stand in line.

READING New Yorkers Do Not Like Waiting in Line

/

ste24102_ch18_782-821.indd 785ste24102_ch18_782-821.indd 785 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

786 Chapter Eighteen Management of Waiting Lines

Infinite-source situation   Customer arrivals are unrestricted.

Finite-source situation  The number of potential customers is limited.

does not significantly distort the picture. As capacity increases, the number of customers wait- ing and the time they wait tend to decrease, thereby decreasing waiting costs. As is typical in trade-off relationships, total costs can be represented as a U-shaped curve. The goal of analy- sis is to identify a level of service capacity that will minimize total cost. (Unlike the situation in the inventory EOQ model, the minimum point on the total cost curve is not usually where the two cost lines intersect.)

In situations where those waiting in line are external customers (as opposed to employ- ees), the existence of waiting lines can reflect negatively on an organization’s quality image. Consequently, some organizations are focusing their attention on providing faster service— speeding up the rate at which service is delivered rather than merely increasing the number of servers. The effect of this is to shift the total cost curve downward if the cost of customer waiting decreases by more than the cost of the faster service.

18.4 CHARACTERISTICS OF WAITING LINES There are numerous queuing models from which an analyst can choose. Naturally, much of the success of the analysis will depend on choosing an appropriate model. Model choice is affected by the characteristics of the system under investigation. The main characteristics are

1. Population source.

2. Number of servers (channels).

3. Arrival and service patterns.

4. Queue discipline (order of service).

Figure 18.2 depicts a simple queuing system.

Population Source The approach to use in analyzing a queuing problem depends on whether the potential number of customers is limited. There are two possibilities: infinite-source and finite-source popula- tions. In an infinite-source situation, the potential number of customers greatly exceeds system capacity. Infinite-source situations exist whenever service is unrestricted. Examples are super- markets, drugstores, banks, restaurants, theaters, amusement centers, and toll bridges. Theo- retically, large numbers of customers from the “calling population” can request service at any time. When the potential number of customers is limited, a finite-source situation exists. An example is the repair technician responsible for a certain number of machines in a company. The potential number of machines that might need repairs at any one time cannot exceed the number of machines assigned to the repairer. Similarly, an operator may be responsible for loading and

FIGURE 18.1 The goal of waiting-line management is to minimize the sum of two costs: customer waiting costs and service capacity costs

Optimum

Cost

Service capacity

Total cost Cost of service capacity

Cost of customers waiting

0

ste24102_ch18_782-821.indd 786ste24102_ch18_782-821.indd 786 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 787

unloading a bank of four machines, a nurse may be responsible for answering patient calls for a 10-bed ward, a secretary may be responsible for taking dictation from three executives, and a company shop may perform repairs as needed on the firm’s 20 trucks.

Number of Servers (Channels) The capacity of queuing systems is a function of the capacity of each server and the number of servers being used. The terms server and channel are synonymous, and it is generally assumed that each channel can handle one customer at a time. Systems can be either single- or multiple-channel. (A group of servers working together as a team, such as a surgical team, is treated as a single-channel system.) Examples of single-channel systems are small grocery stores with one checkout counter, some theaters, single-bay car washes, and drive-in banks with one teller. Multiple-channel systems (those with more than one server) are commonly found in banks, at airline ticket counters, at auto service centers, and at gas stations.

A related distinction is the number of steps or phases in a queuing system. For example, at theme parks, people go from one attraction to another. Each attraction constitutes a separate phase where queues can (and usually do) form.

Figure 18.3 illustrates some of the most common queuing systems. Because it would not be possible to cover all of these cases in sufficient detail in the limited amount of space avail- able here, our discussion will focus on single-phase systems.

Channel  A server in a service system.

FIGURE 18.2 A simple queuing system

Calling population

Waiting line

Arrivals Service

System

Exit

Processing order

FIGURE 18.3 Four common variations of queuing systems

Single channel, single phase

Single channel, multiple phase

Multiple channel, single phase

Multiple channel, multiple phase

ste24102_ch18_782-821.indd 787ste24102_ch18_782-821.indd 787 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

788 Chapter Eighteen Management of Waiting Lines

Arrival and Service Patterns Waiting lines are a direct result of arrival and service variability. They occur because random, highly variable arrival and service patterns cause systems to be temporarily overloaded. In many instances, the variabilities can be described by theoretical distributions. In fact, the most commonly used models assume that arrival and service rates can be described by a Poisson distribution or, equivalently, that the interarrival time and service time can be described by a negative exponential distribution. Figure 18.4 illustrates these distributions.

The Poisson distribution often provides a reasonably good description of customer arriv- als per unit of time (e.g., per hour). Figure 18.5A illustrates how Poisson-distributed arrivals (e.g., accidents) might occur during a three-day period. In some hours, there are three or four arrivals; in other hours one or two arrivals; and in some hours no arrivals.

The negative exponential distribution often provides a reasonably good description of cus- tomer service times (e.g., first aid care for accident victims). Figure 18.5B illustrates how exponential service times might appear for the customers whose arrivals are illustrated in Figure 18.5A. Note that most service times are very short—some are close to zero—but a few require a relatively long service time. That is typical of a negative exponential distribution.

Waiting lines are most likely to occur when arrivals are bunched or when service times are particularly lengthy, and they are very likely to occur when both factors are present. For instance, note the long service time of customer 7 on day 1, in Figure 18.5B. In Figure 18.5A , the seventh customer arrived just after 10 o’clock and the next two customers arrived shortly after that, making it very likely that a waiting line formed. A similar situation occurred on  day 3 with the last three customers: The relatively long service time for customer 13 ( Figure 18.5B) and the short time before the next two arrivals ( Figure 18.5A , day 3) would create (or increase the length of) a waiting line.

It is interesting to note that the Poisson and negative exponential distributions are alternate ways of presenting the same basic information. That is, if service time is exponential, then the service rate is Poisson. Similarly, if the customer arrival rate is Poisson, then the interarrival time (i.e., the time between arrivals) is exponential. For example, if a service facility can pro- cess 12 customers per hour (rate), average service time is five minutes. And if the arrival rate is 10 per hour, then the average time between arrivals is six minutes.

The models described here generally require that arrival and service rates lend themselves to description using a Poisson distribution or, equivalently, that interarrival and service times lend themselves to description using a negative exponential distribution. In practice, it is nec- essary to verify that these assumptions are met. Sometimes this is done by collecting data and plotting them, although the preferred approach is to use a chi-square goodness-of-fit test for that purpose. A discussion of the chi-square test is beyond the scope of this text, but most basic statistics textbooks cover the topic.

FIGURE 18.4 Poisson and negative exponential distributions

.20

.18

.16

.14

.12

.10

.08

.06

.04

.02

.00

Relative frequency

1 Customers per time unit 3 6 8 100 2 4 5 7 9 11 12

Relative frequency (%)

Time

Exponential distribution (time)

Poisson distribution (rate)

0

ste24102_ch18_782-821.indd 788ste24102_ch18_782-821.indd 788 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 789

Research has shown that these assumptions are often appropriate for customer arrivals but less likely to be appropriate for service. In situations where the assumptions are not reason- ably satisfied, the alternatives would be to (1) develop a more suitable model, (2) search for a better (and usually more complex) existing model, or (3) resort to computer simulation. Each of these alternatives requires more effort or cost than the ones presented here.

The models in this chapter assume customers are patient, that is, that customers enter the wait- ing line and remain until they are served. Other possibilities are that (1) waiting customers grow impatient and leave the line ( reneging ); (2) customers switch to another line ( jockeying ); or (3) upon arriving, customers decide the line is too long and, therefore, do not enter the line ( balking ).

Queue Discipline Queue discipline refers to the order in which customers are processed. All but one of the mod- els to be described shortly assume that service is provided on a first-come, first-served basis. This is perhaps the most commonly encountered rule. There is first-come service at banks, stores, theaters, restaurants, four-way stop signs, registration lines, and so on. Examples of

Queue discipline  The order in which customers are processed.

FIGURE 18.5 Poisson arrivals and exponential service times

A. Customer arrivals

B. Service times

Day 1 18

Arrivals per day

8 43211211109

Day 2 14 8 43211211109

Day 3 15 8 43211211109

= An arrival

Day 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Time

0

Time

0

Day 2

Time

0

Day 3

Customer

Customer

Customer

ste24102_ch18_782-821.indd 789ste24102_ch18_782-821.indd 789 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

790 Chapter Eighteen Management of Waiting Lines

systems that do not serve on a first-come basis include hospital emergency rooms, rush orders in a factory, and mainframe computer processing of jobs. In these and similar situations, cus- tomers do not all represent the same waiting costs; those with the highest costs (e.g., the most seriously ill) are processed first, even though other customers may have arrived earlier.

18.5 MEASURES OF WAITING-LINE PERFORMANCE The operations manager typically looks at five measures when evaluating existing or proposed service systems. They relate to potential customer dissatisfaction and costs:

1. The average number of customers waiting, either in line or in the system.

2. The average time customers wait, either in line or in the system.

3. System utilization, which refers to the percentage of capacity utilized.

4. The implied cost of a given level of capacity and its related waiting line.

5. The probability that an arrival will have to wait for service.

Of these measures, system utilization bears some elaboration. It reflects the extent to which the servers are busy rather than idle. On the surface, it might seem that the operations manager would want to seek 100 percent utilization. However, as Figure 18.6 illustrates, increases in system utilization are achieved at the expense of increases in both the length of the waiting line and the average waiting time. In fact, these values become exceedingly large as utiliza- tion approaches 100 percent. The implication is that under normal circumstances, 100 percent utilization is not a realistic goal. Even if it were, 100 percent utilization of service personnel is not good; they need some slack time. Thus, instead, the operations manager should try to achieve a system that minimizes the sum of waiting costs and capacity costs.

18.6 QUEUING MODELS: INFINITE-SOURCE Many queuing models are available for a manager or analyst to choose from. The discussion here includes four of the most basic and most widely used models. The purpose is to provide an exposure to a range of models rather than an extensive coverage of the field. All assume a Poisson arrival rate. Moreover, the models pertain to a system operating under steady-state conditions; that is, they assume the average arrival and service rates are stable (e.g., the opening rush at a store is over). The four models described are

1. Single server, exponential service time.

2. Single server, constant service time.

LO18.3 What metrics are used to help managers analyze waiting lines?

FIGURE 18.6 The average number waiting in line and the average time customers wait in line increase exponentially as the system utilization increases

0 100% System utilization

Average number or time waiting in line

ste24102_ch18_782-821.indd 790ste24102_ch18_782-821.indd 790 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 791

Symbol Represents

� Customer arrival rate

� Service rate per server L q The average number of customers waiting for service L s The average number of customers in the system (waiting and/or being served) r The average number of customers being served � The system utilization W q The average time customers wait in line W s The average time customers spend in the system (waiting in line and service time) 1/ � Service time P o The probability of zero units in the system P n The probability of n units in the system M The number of servers L max The maximum expected number waiting in line

TABLE 18.1 Infinite-source symbols

3. Multiple servers, exponential service time.

4. Multiple priority service, exponential service time.

Note that the terms “server” and “channel” mean the same thing. To facilitate your use of waiting-line models, Table 18.1 provides a list of the symbols used for the infinite-source models.

Basic Relationships Certain basic relationships hold for all infinite-source models. Knowledge of these can be very helpful in deriving desired performance measures, given a few key values. Here are the basic relationships:

Note: The arrival and service rates, represented by � and M, must be in the same units (e.g., customers per hour, customers per minute).

System utilization: This reflects the ratio of demand (as measured by the arrival rate) to supply or capacity (as measured by the product of the number of servers, M, and the service rate, � ).

M

� � �

� (18–1)

The average number of customers being served:

r � �

� (18–2)

For nearly all queuing systems, there is a relationship between the average time a unit spends in the system or queue and the average number of units in the system or queue. According to Little’s law, for a stable system, the average number of customers in line or in the system is equal to the average customer arrival rate multiplied by the average time in line or in the system. That is,

andL W L Ws s q q� � � �

ste24102_ch18_782-821.indd 791ste24102_ch18_782-821.indd 791 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

792 Chapter Eighteen Management of Waiting Lines

The implications of this are important to analysis of waiting lines. The relationships are independent of any probability distribution and require no assumptions about which customers arrive or are serviced, or the order in which they are served. It also means that knowledge of any two of the three variables can be used to obtain the third variable. For example, knowing the arrival rate and the average number in line, one can solve for the average waiting time.

The average number of customers

Waiting in line for service: L q [Model dependent. Obtain using a table or formula.]

In the system (line plus being served): L L rs q� � (18–3)

The average time customers are

Waiting in line: W L

q q

� �

(18–4)

In the system: 1

W W L

s q s

� � �

� �

(18–5)

All infinite-source models require that system utilization be less than 1.0; the models apply only to underloaded systems.

The average number waiting in line, L q , is a key value because it is a determinant of some of the other measures of system performance, such as the average number in the sys- tem, the average time in line, and the average time in the system. Hence, L q will usually be one of the first values you will want to determine in problem solving.

Figure 18.7 can help you relate the symbols to the basic relationships in a queuing system.

FIGURE 18.7 Basic relationships

1

E X A M P L E 1 Customers arrive at a bakery at an average rate of 18 per hour on weekday mornings. The arrival distribution can be described by a Poisson distribution with a mean of 18. Each clerk can serve a customer in an average of three minutes; this time can be described by an expo- nential distribution with a mean of 3.0 minutes.

a. What are the arrival and service rates?

b. Compute the average number of customers being served at any time.

c. Suppose it has been determined that the average number of customers waiting in line is 8.1. Compute the average number of customers in the system (i.e., waiting in line or being served), the average time customers wait in line, and the average time in the system.

d. Determine the system utilization for M   �  1, 2, and 3 servers.

e celx mhhe.com/stevenson12e

S O L U T I O N a. The arrival rate is given in the problem: �   �  18 customers per hour. Change the service time to a comparable hourly rate. Thus,

60 minutes per hour/3 minutes per customer  �   �   �  20 customers per hour

ste24102_ch18_782-821.indd 792ste24102_ch18_782-821.indd 792 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 793

b. 18

20 .90 customer.r �

� � �

c. Given: L q   �  8.1 customers.

L s   �   L q   � r   �  8.1  �  .90  �  9.0 customers

8.1

18 .45 hourW

L q

q �

� � �

Waiting in line plus service

1 .45

1

20 .50 hour

W

W

s

q

� � �

� � �

d. System utilization is . M

� � �

For 1, 18

1(20) .90M � � � �

For 2, 18

2(20) .45M � � � �

For 3, 18

3(20) .30M � � � �

TABLE 18.2 Formulas for basic single-server model

Performance Measure Equation

Average number in line � �

� � � � Lq

( )

2

(18–6)

Probability of zero units in the system

⎛ ⎝⎜

⎞ ⎠⎟

� � �

� P 10

(18–7)

Probability of n units in the system ⎛ ⎝⎜

⎞ ⎠⎟

� �

� P Pn

n

0 (18–8a)

Probability of less than n units in the system

⎜⎜⎜⎜⎜⎜ ⎞

⎟⎟⎟⎟⎟⎟

� � �

� �P n

n

1

(18–8b)

1 This notation is commonly used to specify waiting-line models. The first symbol refers to arrivals, the second to service, and the third to the number of servers. M stands for a rate that can be described by a Poisson distribution or, equivalently, a time that can be described by an exponential distribution. Hence, M/M/1 indicates a Poisson arrival rate, a Poisson service rate, and one server. The symbol D is used to denote a deterministic (i.e., constant) service rate. Thus the notation M/D/1 would indicate the arrival rate is Poisson and the service rate is constant. Finally, the notation M/M/S would indicate multiple servers.

Note that as the system capacity as measured by M � increases, the system utilization for a given arrival rate decreases.

Single Server, Exponential Service Time, M/M/1 1 The simplest model involves a system that has one server (or a single crew). The queue disci- pline is first-come, first-served, and it is assumed that the customer arrival rate can be approxi- mated by a Poisson distribution and service time by a negative exponential distribution. There is no limit on length of queue.

Table 18.2 lists the formulas for the single-server model, which should be used in conjunction with Formulas 18–1 through 18–5.

ste24102_ch18_782-821.indd 793ste24102_ch18_782-821.indd 793 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

794 Chapter Eighteen Management of Waiting Lines

LO18.4 What very important lesson does the constant service time model provide for managers?

An airline is planning to open a satellite ticket desk in a new shopping plaza, staffed by one ticket agent. It is estimated that requests for tickets and information will average 15 per hour, and requests will have a Poisson distribution. Service time is assumed to be exponentially dis- tributed. Previous experience with similar satellite operations suggests that mean service time should average about three minutes per request. Determine each of the following:

a. System utilization.

b. Percentage of time the server (agent) will be idle.

c. The expected number of customers waiting to be served.

d. The average time customers will spend in the system.

e. The probability of zero customers in the system and the probability of four customers in the system.

E X A M P L E 2 e celx

mhhe.com/stevenson12e

�   �  15 customers per hour

1

Service time

1 customer

3 minutes 60 minutes per hour

20 customers per hour

� � �

a. 15

1(20) .75

M � �

� � �

b. Percentage idle time  �  1  �   �   �  1  �  .75  �  .25, or 25 percent

c. ( )

15

20(20 15) 2.25 customers

2 2

Lq � �

� � � � �

� �

d. 1 2.25

15

1

20 .20 hour,W

L s

q �

� �

� � � � or 12 minutes

e. 1 1 15

20 .25 and .25

15

20 .0790 4 0

4 4

P P P ⎛ ⎝⎜

⎞ ⎠⎟

⎛ ⎝⎜

⎞ ⎠⎟� �

� � � � �

� � �

S O L U T I O N

Single Server, Constant Service Time, M/D/1 As noted previously, waiting lines are a consequence of random, highly variable arrival and service rates. If a system can reduce or eliminate the variability of either or both, it can shorten waiting lines noticeably. A case in point is a system with constant service time. The effect of a constant service time is to cut in half the average number of customers waiting in line:

( )

2

Lq 2

� �

� � � � (18–9)

The average time customers spend waiting in line is also cut in half. Similar improvements can be realized by smoothing arrival times (e.g., by use of appointments). Thus, anything a manager can do to reduce service time variability will reduce the number waiting and the time waiting.

Wanda’s Car Wash & Dry is an automatic, five-minute operation with a single bay. On a typi- cal Saturday morning, cars arrive at a mean rate of eight per hour, with arrivals tending to follow a Poisson distribution. Find

a. The average number of cars in line.

b. The average time cars spend in line and service.

e celx mhhe.com/stevenson12e

E X A M P L E 3

ste24102_ch18_782-821.indd 794ste24102_ch18_782-821.indd 794 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 795

�   �  8 cars per hour

�   �  1 per 5 minutes, or 12 per hour

a. 2 ( )

8

2(12)(12 8) .667 car

2 2

Lq � �

� � � � �

� �

b. 1 .667

8

1

12 .167W

L s

q �

� �

� � � � hour, or 10 minutes

Performance Measure Equation

Average number in line

⎛ ⎝⎜

⎞ ⎠⎟

�� �

� � � � L

M M Pq

M

( 1)!( )2 0 (18–10)

Probability of zero units in the system

∑ ⎛ ⎝⎜

⎞ ⎠⎟

⎛ ⎝⎜

⎞ ⎠⎟

⎛ ⎝⎜

⎞ ⎠⎟

⎢ ⎢ ⎢ ⎢ ⎢

⎥ ⎥ ⎥ ⎥ ⎥

� �

� �

� �

P n

M M

n M

n

M

! ! 1

0 0

1

1

(18–11)

Average waiting time for a customer who has to wait

� � � �

W M

a 1

(18–12)

Probability that an arrival will have to wait for service

�P W W

w q

a (18–13)

TABLE 18.3 Multiple-server queuing formulas

S O L U T I O N

Multiple Servers, M/M/S A multiple-server system exists whenever two or more servers are working indepen- dently to provide service to customer arrivals. Use of the model involves the following assumptions:

1. A Poisson arrival rate and exponential service time.

2. Servers all work at the same average rate.

3. Customers form a single waiting line (in order to maintain first-come, first-served processing).

Formulas for the multiple-server model are listed in Table 18.3 . Obviously, the multiple- server formulas are more complex than the single-server formulas, especially the formu- las for L q and P 0 . These formulas are shown primarily for completeness; you can actually determine their values using Table 18.4 , which gives values of L q and P 0 for selected values of � / � and M.

To use Table 18.4 , compute the value of � / � and round according to the number of deci- mal places given for that ratio in the table. Then simply read the values of L q and P 0 for the appropriate number of channels, M. For instance, if � / �   �  0.50 and M   �  2, the table provides a value of 0.033 for L q and a value of .600 for P 0 . These values can then be used to compute other measures of system performance. Note that the formulas in Table 18.3 and the values in Table 18.4 yield average amounts (i.e., expected values). Note also that Table 18.4 can be used for some single-channel problems (i.e., M   �  1) as well.

ste24102_ch18_782-821.indd 795ste24102_ch18_782-821.indd 795 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

796 Chapter Eighteen Management of Waiting Lines

  � / � M  L  q  P  0

0.15 1 0.026 .850 2 0.001 .860

0.20 1 0.050 .800 2 0.002 .818

0.25 1 0.083 .750 2 0.004 .778

0.30 1 0.129 .700 2 0.007 .739

0.35 1 0.188 .650 2 0.011 .702

0.40 1 0.267 .600 2 0.017 .667

0.45 1 0.368 .550 2 0.024 .633 3 0.002 .637

0.50 1 0.500 .500 2 0.033 .600 3 0.003 .606

0.55 1 0.672 .450 2 0.045 .569 3 0.004 .576

0.60 1 0.900 .400 2 0.059 .538 3 0.006 .548

0.65 1 1.207 .350 2 0.077 .509 3 0.008 .521

0.70 1 1.633 .300 2 0.098 .481 3 0.011 .495

0.75 1 2.250 .250 2 0.123 .455 3 0.015 .471

0.80 1 3.200 .200 2 0.152 .429 3 0.019 .447

0.85 1 4.817 .150 2 0.187 .404 3 0.024 .425 4 0.003 .427

0.90 1 8.100 .100 2 0.229 .379 3 0.030 .403 4 0.004 .406

0.95 1 18.050 .050 2 0.277 .356 3 0.037 .383 4 0.005 .386

1.0 2 0.333 .333 3 0.045 .364 4 0.007 .367

TABLE 18.4 Infinite-source values for L q and P 0 given � / � and M

  � / � M  L  q  P  0

1.1 2 0.477 .290 3 0.066 .327 4 0.011 .332

1.2 2 0.675 .250 3 0.094 .294 4 0.016 .300 5 0.003 .301

1.3 2 0.951 .212 3 0.130 .264 4 0.023 .271 5 0.004 .272

1.4 2 1.345 .176 3 0.177 .236 4 0.032 .245 5 0.006 .246

1.5 2 1.929 .143 3 0.237 .211 4 0.045 .221 5 0.009 .223

1.6 2 2.844 .111 3 0.313 .187 4 0.060 .199 5 0.012 .201

1.7 2 4.426 .081 3 0.409 .166 4 0.080 .180 5 0.017 .182

1.8 2 7.674 .053 3 0.532 .146 4 0.105 .162 5 0.023 .165

1.9 2 17.587 .026 3 0.688 .128 4 0.136 .145 5 0.030 .149 6 0.007 .149

2.0 3 0.889 .111 4 0.174 .130 5 0.040 .134 6 0.009 .135

2.1 3 1.149 .096 4 0.220 .117 5 0.052 .121 6 0.012 .122

2.2 3 1.491 .081 4 0.277 .105 5 0.066 .109 6 0.016 .111

2.3 3 1.951 .068 4 0.346 .093 5 0.084 .099 6 0.021 .100

  � / � M  L  q  P  0

2.4 3 2.589 .056 4 0.431 .083 5 0.105 .089 6 0.027 .090 7 0.007 .091

2.5 3 3.511 .045 4 0.533 .074 5 0.130 .080 6 0.034 .082 7 0.009 .082

2.6 3 4.933 .035 4 0.658 .065 5 0.161 .072 6 0.043 .074 7 0.011 .074

2.7 3 7.354 .025 4 0.811 .057 5 0.198 .065 6 0.053 .067 7 0.014 .067

2.8 3 12.273 .016 4 1.000 .050 5 0.241 .058 6 0.066 .060 7 0.018 .061

2.9 3 27.193 .008 4 1.234 .044 5 0.293 .052 6 0.081 .054 7 0.023 .055

3.0 4 1.528 .038 5 0.354 .047 6 0.099 .049 7 0.028 .050 8 0.008 .050

3.1 4 1.902 .032 5 0.427 .042 6 0.120 .044 7 0.035 .045 8 0.010 .045

3.2 4 2.386 .027 5 0.513 .037 6 0.145 .040 7 0.043 .040 8 0.012 .041

3.3 4 3.027 .023 5 0.615 .033 6 0.174 .036 7 0.052 .037 8 0.015 .037

(continued)

ste24102_ch18_782-821.indd 796ste24102_ch18_782-821.indd 796 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 797

TABLE 18.4 (Concluded)

  � / � M  L  q  P  0

3.4 4 3.906 .019 5 0.737 .029 6 0.209 .032 7 0.063 .033 8 0.019 .033

3.5 4 5.165 .015 5 0.882 .026 6 0.248 .029 7 0.076 .030 8 0.023 .030 9 0.007 .030

3.6 4 7.090 .011 5 1.055 .023 6 0.295 .026 7 0.019 .027 8 0.028 .027 9 0.008 .027

3.7 4 10.347 .008 5 1.265 .020 6 0.349 .023 7 0.109 .024 8 0.034 .025 9 0.010 .025

3.8 4 16.937 .005 5 1.519 .017 6 0.412 .021 7 0.129 .022 8 0.041 .022 9 0.013 .022

3.9 4 36.859 .002 5 1.830 .015 6 0.485 .019 7 0.153 .020 8 0.050 .020 9 0.016 .020

4.0 5 2.216 .013 6 0.570 .017 7 0.180 .018 8 0.059 .018 9 0.019 .018

4.1 5 2.703 .011 6 0.668 .015 7 0.212 .016 8 0.070 .016 9 0.023 .017

4.2 5 3.327 .009 6 0.784 .013 7 0.248 .014 8 0.083 .015 9 0.027 .015 10 0.009 .015

4.3 5 4.149 .008 6 0.919 .012

  � / � M  L  q  P  0

4.3 7 0.289 .130 8 0.097 .013

9 0.033 .014

10 0.011 .014

4.4 5 5.268 .006

6 1.078 .010

7 0.337 .012

8 0.114 .012

9 0.039 .012

10 0.013 .012

4.5 5 6.862 .005

6 1.265 .009

7 0.391 .010

8 0.134 .011

9 0.046 .011

10 0.015 .011

4.6 5 9.289 .004

6 1.487 .008

7 0.453 .009

8 0.156 .010

9 0.054 .010

10 0.018 .010

4.7 5 13.382 .003

6 1.752 .007

7 0.525 .008

8 0.181 .009

9 0.064 .009

10 0.022 .009

4.8 5 21.641 .002

6 2.071 .006

7 0.607 .008

8 0.209 .008

9 0.074 .008

10 0.026 .008

4.9 5 46.566 .001

6 2.459 .005

7 0.702 .007

8 0.242 .007

9 0.087 .007

10 0.031 .007

11 0.011 .007

5.0 6 2.938 .005

7 0.810 .006

8 0.279 .006

9 0.101 .007

10 0.036 .007

11 0.013 .007

5.1 6 3.536 .004 7 0.936 .005 8 0.321 .006 9 0.117 .006 10 0.042 .006 11 0.015 .006

  � / � M  L  q  P  0

5.2 6 4.301 .003 7 1.081 .005 8 0.368 .005 9 0.135 .005 10 0.049 .005 11 0.018 .006

5.3 6 5.303 .003 7 1.249 .004 8 0.422 .005 9 0.155 .005 10 0.057 .005 11 0.021 .005 12 0.007 .005

5.4 6 6.661 .002 7 1.444 .004 8 0.483 .004 9 0.178 .004 10 0.066 .004 11 0.024 .005 12 0.009 .005

5.5 6 8.590 .002 7 1.674 .003 8 0.553 .004 9 0.204 .004 10 0.077 .004 11 0.028 .004 12 0.010 .004

5.6 6 11.519 .001 7 1.944 .003 8 0.631 .003 9 0.233 .004 10 0.088 .004 11 0.033 .004 12 0.012 .004

5.7 6 16.446 .001 7 2.264 .002 8 0.721 .003 9 0.266 .003 10 0.102 .003 11 0.038 .003 12 0.014 .003

5.8 6 26.373 .001 7 2.648 .002 8 0.823 .003 9 0.303 .003 10 0.116 .003 11 0.044 .003 12 0.017 .003

5.9 6 56.300 .000 7 3.113 .002 8 0.939 .002 9 0.345 .003 10 0.133 .003

ste24102_ch18_782-821.indd 797ste24102_ch18_782-821.indd 797 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

798 Chapter Eighteen Management of Waiting Lines

e celx mhhe.com/stevenson12e

e celx mhhe.com/stevenson12e

E X A M P L E 4 Alpha Taxi and Hauling Company has seven cabs stationed at the air- port. The company has determined that during the late-evening hours on weeknights, customers request cabs at a rate that follows the Poisson dis- tribution with a mean of 6.6 per hour. Service time is exponential with a mean of 50 minutes per customer. Assume that there is one customer per cab. Find each of the perfor- mance measures listed in Table 18.3 and the system utilization.

�   �  6.6 per hour M   �  7 cabs (servers) 1 customer per trip

50 minutes per trip 60 minutes per hour

1.2 customers per hour per cab

� �

�/� � 5.5

From Table 18.4 with M   �  7,

L q     �  1.674 customers and P 0   �  .003

1 1

7(1.2) 6.6 .556 hour, or 33.36 minutesW

M a �

� � � �

� �

1.674

6.6 .2536 hour, or 15.22 minutes

.2536

.556 .456

W L

P W

W

q q

W q

a

� �

� �

� � �

6.6

7(1.2) .786

M � �

� � �

S O L U T I O N

ste24102_ch18_782-821.indd 798ste24102_ch18_782-821.indd 798 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 799

The Excel template also can be used to solve Example 4. After entering �   �  6.6 and �   �  1.2 at the top of the template, the queuing statistics for 7 servers are shown in the first column of the table in the template. The template also provides queuing statistics for 8 through 12 servers for comparison, although these are not required for this example. In addition, the template can be used to increment � ,  � , or the number of servers to further investigate the queuing system.

The process also can be worked in reverse; that is, an analyst can determine the capacity needed to achieve specified levels of various performance measures. This approach is illus- trated in the following example.

Alpha Taxi and Hauling also plans to have cabs at a new rail station. The expected arrival rate is 4.8 customers per hour, and the service rate (including return time to the rail station) is expected to be 1.5 per hour. How many cabs will be needed to achieve an average time in line of 20 minutes or less?

E X A M P L E 5 e celx

mhhe.com/stevenson12e

�   �  4.8 customers per hour

�   �  1.5 customers per hour

M   �  ?

4.8

1.5 3.2 customersr �

� � �

W q  (desired)  �  20 minutes, or .333 hour

Using L q   �   �     W q , you can solve for L q :  4.8/hour  (.333  hour)  �   1.6 customers. Thus, the average number waiting should not exceed 1.6 customers. Referring to Table 18.4 , with r   �  3.2,  L q   �  2.386 for M   �  4, and 0.513 for M   �  5. Hence, five cabs will be needed.

S O L U T I O N

Finally, note that in a situation where there are multiple servers, each with a separate line (e.g., a supermarket), each line would be treated as a single-server system.

Cost Analysis The design of a service system often reflects the desire of management to balance the cost of capacity with the expected cost of customers waiting in the system. (Note that customer waiting cost refers to the costs incurred by the organization due to customer waiting.) For example, in designing loading docks for a warehouse, the cost of docks plus loading crews must be balanced against the cost of trucks and drivers that will be in the system, both while waiting to be unloaded and while actually being unloaded. Similarly, the cost of having a mechanic wait for tools at a tool crib must be balanced against the cost of servers at the crib. In cases where the customers are not employees (e.g., retail sales), the costs can include lost sales when customers refuse to wait, the cost of providing waiting space, and the cost of added congestion (lost business, shoplifting).

The optimal capacity (usually in terms of number of channels) is one that minimizes the sum of customer waiting costs and capacity or server costs. Thus, the goal is

Minimize Totalcost Customer

waiting cost Capacity

cost � �

The simplest approach to a cost analysis involves computing system costs, that is, comput- ing the costs for customers in the system and total capacity cost. Capacity cost typically is a function of the number of servers.

An iterative process is used to identify the capacity size that will minimize total costs. Capac- ity is incremented one unit at a time (e.g., increase the number of channels by one) and the total cost is computed at each increment. Because the total cost curve is U-shaped, usually the total cost will initially decrease as capacity is increased, and then it will eventually begin to increase. Once it begins to increase, additional increases in capacity will cause it to continue to increase. Hence, once that occurs, the optimal capacity size can be readily identified. Figure 18.8 illustrates this approach. Find the total cost for M   �  1, then M   �  2,  M   �  3, and continue as long as the total

ste24102_ch18_782-821.indd 799ste24102_ch18_782-821.indd 799 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

800 Chapter Eighteen Management of Waiting Lines

costs continue to decline. However, as soon as the total cost begins to rise, as it does at M   �  3 in Figure 18.8 , the search can be stopped. The optimal solution is apparent; it is M   �  2. There would be no need to continue computing total costs for additional servers because, as you can see, the total costs will continue to increase as more servers are added. Note: Although in many instances the starting point is M   �  1, the general rule is to begin at the smallest number of servers for which the system is underloaded (i.e., the system utilization is < 1.00).

The computation of customer waiting costs is based on the average number of customers in the system. This is perhaps not intuitively obvious; instead, it might seem that customer wait- ing time in the system would be more appropriate. However, that approach would pertain to only one customer—it would not convey information concerning how many customers would wait that long. Obviously, an average of five customers waiting would involve a lower wait- ing cost than an average of nine. Therefore, it is necessary to focus on the number waiting. Moreover, if on average two customers are in the system, this is equivalent to having exactly two customers in the system at all times, even though in reality there will be times when zero, one, two, three, or more customers are in the system.

FIGURE 18.8 As the number of servers is increased, the optimal number of servers becomes apparent when the total cost begins to increase

Total cost

Total cost for M � 1

M � 1 M � 2 M � 3 M � 4 M � 5

Number of servers

Lowest total cost

0

Stop

1

2 3

4

5

Trucks arrive at a warehouse at a rate of 15 per hour during business hours. Crews can unload the trucks at a rate of five per hour. The high unloading rate is due to cargo being container- ized. Recent changes in wage rates have caused the warehouse manager to reexamine the question of how many crews to use. The new rates are: Crew and dock cost is $100 per hour; truck and driver cost is $120 per hour.

E X A M P L E 6 e celx

mhhe.com/stevenson12e

( L q values are from Table 18.4 , using 15

5 3.0.

� � � )

Number of Crews (M)

Crew and Dock Cost

⎣ ⎢

⎦ ⎥� �

� L Ls q

Average Number in

System

 [  L  s     �  $120] Driver/ Truck

Cost Total Cost 4 $400 1.528  �  3.0  �  4.528 $543.36 $943.36 5 500 .354  �  3.0  �  3.354 402.48 902.48 (minimum) 6 600 .099  �  3.0  �  3.099 371.88 971.88 7 700 .028  �  3.0  �  3.028 363.36 1,063.36

Five crews will minimize the total cost. Because the total cost will continue to increase once the minimum is reached, it is not really necessary to compute total costs for crew sizes larger than six, because total cost increased as the crew size was increased from five to six, indicating that a crew of five is optimal.

S O L U T I O N

ste24102_ch18_782-821.indd 800ste24102_ch18_782-821.indd 800 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 801

One additional point should be made concerning cost analysis. Because both customer wait- ing costs and capacity costs often reflect estimated amounts, the apparent optimal solution may not represent the true optimum. One ramification of this is that when computations are shown to the nearest penny, or even the nearest dollar, the total cost figures may seem to imply a higher degree of precision than is really justified by the cost estimates. This is compounded by the fact that arrival and service rates may either be approximations or not be exactly represented by the Poisson/exponential distribution. Another ramification is that if cost estimates can be obtained as ranges (e.g., customer waiting cost is estimated to range between $40 and $50 per hour), total costs should be computed using both ends of the range to see whether the optimal solution is affected. If it is, management must decide whether to expend additional effort to obtain more precise cost estimates or choose one of the two indicated optimal solutions. Management would most likely choose to employ the latter strategy if there were little disparity between total costs of various capacity levels close to the indicated optimal solutions.

Maximum Line Length Another question that often comes up in capacity planning is the amount of space to allo- cate for waiting lines. Theoretically, with an infinite population source, the waiting line can become infinitely long. This implies that no matter how much space is allocated for a waiting line, one can never be completely sure that the space requirements won’t exceed that amount. Nonetheless, as a practical matter, one can determine a line length that will not be exceeded a specified proportion of the time. For instance, an analyst may wish to know the length of line that will probably not be exceeded 98 percent of the time, or perhaps 99 percent of the time, and use that number as a planning value.

The approximate line length that will satisfy a specified percentage can be determined by solving the following equation for L max :

log

log or

ln

ln maxL

K K �

� � (18–14)

where

1 Specifiedpercentage

(1 ) K

Lq �

� �

The resulting value of L max will not usually be an integer. Generally, round up to the next integer and treat the value as L max . However, as a practical matter, if the computed value of L max is less than .10 above the next lower integer, round down. Thus, 15.2 would be rounded to 16, but 15.06 would be rounded to 15.

Determine the maximum length of a waiting line for specified probabilities of 95 percent and 98 percent, for a system in which M   �  2,  �   �  8 per hour, and �   �  5 per hour.

E X A M P L E 7

8

5 1.6 and

8

2(5) .80r � � � � �

From Table 18.4 , L q   �  2.844 customers. For 95 percent, using Formula 18–14:

1 .95

2.844(1 .80) .088

ln .088

ln .80

2.4304

.2231 10.89, which rounds to 11max

K

L

� �

� �

� � �

� �

For 98 percent:

� �

� �

� � �

� �

1 .98

2.844(1 .80) .035

ln .035

ln .80

3.352

.2231 15.02, which rounds to 15max

K

L

S O L U T I O N

ste24102_ch18_782-821.indd 801ste24102_ch18_782-821.indd 801 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

802 Chapter Eighteen Management of Waiting Lines

Multiple Priorities In many queuing systems, processing occurs on a first-come, first-served basis. However, there are situations in which that rule is inappropriate. The reason is that the waiting cost or penalty incurred is not the same for all customers. In a hospital emergency waiting room, a wide variety of injuries and illnesses needs treatment. Some may be minor (e.g., sliver in finger) and others may be much more serious, even life-threatening. It is more reasonable to treat the most serious cases first, letting the nonserious cases wait until all serious cases have been treated. Similarly, computer processing of jobs often follows rules other than first-come, first-served (e.g., shortest job first). In such cases, a multiple-priority model is useful for describing customer waiting times.

In these systems, arriving customers are assigned to one of several priority classes, or categories, according to a predetermined assignment method (e.g., in a hospital emergency room, heart attacks, serious injuries, and unconscious persons are assigned to the highest pri- ority class; sprains, minor cuts, bruises, and rashes are assigned to the lowest class; and other problems are assigned to one or more intermediate classes). Customers are then processed by class, highest class first. Within each class, processing is first-come, first-served. Thus, all customers in the highest class would be processed before those in the next lower class, then processing would move to that class, and then to the next lower class. Exceptions would occur only if a higher-priority customer arrived; that customer would be processed after the customer currently being processed (i.e., service would not be preemptive ).

This model incorporates all of the assumptions of the basic multiple-server model except that it uses priority serving instead of first-come, first-served. Arrivals to the system are assigned a priority as they arrive (e.g., highest priority  �  1, next priority class  �  2, next prior- ity class  �  3, and so on). An existing queue might look something like this:

Multiple-priority model  Customers are processed according to some measure of importance.

Arrivals 4 3 3 3 2 1 1

Exit Service

Line

Within each class, waiting units are processed in the order in which they arrived (i.e., first- come, first-served). Thus, in this sequence, the first 1 would be processed as soon as a server was available. The second 1 would be processed when that server or another one became available. If, in the interim, another 1 arrived, it would be next in line ahead of the first 2. If there were no new arrivals, the only 2 would be processed by the next available server. At that point, if a new 1 or 2 arrived, it would be processed ahead of the 3s and the 4. Conversely, if a new 4 arrived, it would take its place at the end of the line.

Obviously, a unit with a low priority could conceivably wait a rather long time for process- ing. In some cases, units that have waited more than some specified time are reassigned to a higher priority.

Table 18.5 gives the appropriate formulas for this multiple-channel priority service model. However, due to the extent of computations involved, it is best to use the appropriate Excel template on the Web site for computations.

A machine shop handles tool repairs in a large company. As each job arrives in the shop, it is assigned a priority based on urgency of the need for that tool. Requests for repair can be described by a Poisson distribution. Arrival rates are: � 1   �  2 per hour, � 2   �  2 per hour, and � 3   �  1 per hour. The service rate is one tool per hour for each server, and there are six servers in the shop. Determine the following information.

a. The system utilization.

b. The average time a tool in each of the priority classes will wait for service.

c. The average time a tool spends in the system for each priority class.

d. The average number of tools waiting for repair in each class.

E X A M P L E 8

ste24102_ch18_782-821.indd 802ste24102_ch18_782-821.indd 802 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 803

�   �  � � k   �  2  �  2  �  1  �  5 customers per hour

M   �  6 servers

�   �  1 customer per hour

Using the Excel template, the solution would appear as follows:

S O L U T I O N

Performance Measure Formula Formula Number

System utilization � �

�M (18–15)

Intermediate values (L q from Table 18.4 )

� �

� � A

Lq(1 ) (18–16)

∑� � �

�� B

M k

c

c

k

1 1

(18–17)

( B 0   �  1)

Average waiting time in line for units in k th priority class

� �

W A B B

k k k

1 · ·1

(18–18)

Average time in the system for units in the k th priority class

� � �

W Wk 1

(18–19)

Average number waiting in line for units in the k th priority class

L k   �   � k     W k (18–20)

TABLE 18.5 Multiple-server priority service model

e celx mhhe.com/stevenson12e

Revising Priorities. If any of the waiting times computed in Example 8 is deemed too long by management (e.g., a waiting time of .147 hour for tools in the first class might be too long), there are several options. One is to increase the number of servers. Another is to

ste24102_ch18_782-821.indd 803ste24102_ch18_782-821.indd 803 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

804 Chapter Eighteen Management of Waiting Lines

attempt to increase the service rate, say, by introducing new methods. If such options are not feasible, another approach is to reexamine the membership of each of the priority classifica- tions because if some repair requests in the first priority class, for example, can be reassigned to the second priority class, this will tend to decrease the average waiting times for repair jobs in the highest priority classification, simply because the arrival rate of those items will be lower.

The manager of the repair shop, after consulting with the managers of the departments that use the shop’s services, has revised the list of tools that are given the highest priorities. This is reflected by revised arrival rates. Suppose that the revised rates are: � 1   �  1.5,  � 2   �  2.5, and � 3 remains unchanged at 1.0. Determine the following information:

a. The system utilization.

b. The average waiting time for units in each priority class.

E X A M P L E 9 e celx

mhhe.com/stevenson12e

�   �  � � k   �  1.5  �  2.5  �  1.0  �  5.0 customers per hour

M   �  6 servers

�   �  1 customer per hour

S O L U T I O N

a. As shown in the template, the system utilization is still 0.8333.

b. W 1   �  0.1306, W 2   �  0.3917, W 3   �  1.7625.

Example 9 offers several interesting results. One is that through reduction of the arrival rate of the highest priority class, the average waiting time for units in that class has decreased. In other words, removing some members of the highest class and placing them into the next-lower class reduced the average waiting time for units that remained

ste24102_ch18_782-821.indd 804ste24102_ch18_782-821.indd 804 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 805

in the highest class. Note that the average waiting time for the second priority class also was reduced, even though units were added to that class. Although this may appear counterintuitive, it is necessary to recognize that the total waiting time (when all arriv- als are taken into account) will remain unchanged. We can see this by noticing that the average number waiting (see Example 8, part  d ) is .2938  �  .8813  �  1.7625  �  2.9376. In Example 9, using the average waiting times just computed, the average number waiting in all three classes is

1.5(.1306) 2.5(.3917) 1.0(1.7625) 2.9376 1

3

� � � � � �

∑ Wk k k

Aside from a slight difference due to rounding, the totals are the same. Another interesting observation is that the average waiting time for customers in

the third priority class did not change from the preceding example. The reason for this is  that the total arrival rate for the two higher-priority classes did not change, and the average arrival rate for this class did not change. Hence, units assigned to the lowest class must still contend with a combined arrival rate of 4 for the two higher-priority classes.

18.7 QUEUING MODEL: FINITE-SOURCE The finite-source model is appropriate for cases in which the calling population is limited to a relatively small number of potential calls. For instance, one person may be responsible for handling breakdowns on 15 machines; thus, the size of the calling population is 15. However, there may be more than one server or channel; for example, due to a backlog of machines awaiting repairs, the manager might authorize an additional person to work on repairs.

As in the infinite-source models, arrival rates are required to be Poisson and service times exponential. A major difference between the finite- and infinite-source models is that the arrival rate of customers in a finite situation is affected by the length of the waiting line; the arrival rate decreases as the length of the line increases simply because there is a decreasing proportion of the population left to generate calls for service. The limit occurs when all of the population is waiting in line; at that point the arrival rate is zero since no additional units can arrive.

Because the mathematics of the finite-source model can be complex, analysts often use finite-queuing tables in conjunction with simple formulas to analyze these systems. Table 18.6 contains a list of the key formulas and definitions. You will find it helpful to study the diagram of a cycle that is presented in the table. It can be useful to think of the cycle in terms of a machine that is running (first part of the cycle), waiting to be repaired or unloaded (second phase of the cycle), or being repaired or unloaded (last phase of the cycle). The cycle then repeats.

Table 18.7 is an abbreviated finite-queuing table used to obtain values of D and F. (Most of the formulas require a value for F. ) In order to use the finite-queuing table, follow this procedure:

1. Identify the values for a. N, population size. b. M, number of servers/channels. c. T, average service time. d. U, average time between calls for service per customer.

2. Compute the service factor, X   �   T /( T   �   U ).

3. Locate the section of the finite-queuing tables for N.

4. Using the value of X as the point of entry, find the values of D and F that correspond to M.

5. Use the values of N, M, X, D, and F as needed to determine the values of the desired measures of system performance.

ste24102_ch18_782-821.indd 805ste24102_ch18_782-821.indd 805 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Performance Measure Formulas Notation

Service factor �

� X

T T U

(18 –21) D   � Probability that a customer will have to wait in line

Average number waiting L   �   N  ( 1  �   F  ) (18–22) F   �  Efficiency factor: 1  �  Percentage waiting in line

Average waiting time � �

� �

� W

L T U N L

T F XF

( ) (1 ) (18 –23) H   �  Average number of customers being served

Average number running

J   �   NF ( 1  �   X  ) (18–24) J   �   Average number of customers not in line or in service

Average number being served

H   �   FNX (18–25) L   �   Average number of customers waiting for service

Number in population N   �   J   �   L   �   H (18–25) M   �  Number of service channels N   �  Number of potential customers T   �  Average service time U   �   Average time between customer service

requirements per customer W   �  Average time customers wait in line X   �  Service factor

*The purpose of this formula is to provide an understanding of F. Because the value of F is needed to compute J, L, and H, the formulas cannot be used to actually compute F. The finite queuing tables must be used for that purpose.

† Adapted from L. G. Peck and R. N. Hazelwood, Finite Queuing Tables (New York: John Wiley & Sons, 1958). Reprinted by permission.

806 Chapter Eighteen Management of Waiting Lines

TABLE 18.6 Finite-source queuing formulas and notation

J L H

U W T

Not waiting or being served

Being served

Average number:

Average time:

Cycle

J + H

J + L + H F =

*

Waiting

N   �  5

T   �  10 minutes

M   �  1

U   �  70 minutes

10

10 70 .125X

T

T U �

� �

� �

S O L U T I O N

e celx mhhe.com/stevenson12e

One operator loads and unloads a group of five machines. Service time is exponentially distrib- uted with a mean of 10 minutes per cycle. Machines run for an average of 70 minutes between loading and unloading, and this time is also exponential. Find:

a. The average number of machines waiting for the operator.

b. The expected number of machines running.

c. Average downtime.

d. The probability that a machine will not have to wait for service.

E X A M P L E 1 0

ste24102_ch18_782-821.indd 806ste24102_ch18_782-821.indd 806 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 807

X M D F

Population 5 .012 1 .060 .999 .019 1 .095 .998 .025 1 .125 .997 .030 1 .149 .996 .034 1 .169 .995 .036 1 .179 .994 .040 1 .199 .993 .042 1 .208 .992 .044 1 .218 .991 .046 1 .228 .990 .050 1 .247 .989 .052 1 .257 .988 .054 1 .266 .987 .056 2 .018 .999

1 .276 .985 .058 2 .019 .999

1 .285 .984 .060 2 .020 .999

1 .295 .983 .062 2 .022 .999

1 .304 .982 .064 2 .023 .999

1 .314 .981 .066 2 .024 .999

1 .323 .979 .068 2 .026 .999

1 .333 .978 .070 2 .027 .999

1 .342 .977 .075 2 .031 .999

1 .365 .973 .080 2 .035 .998

1 .388 .969 .085 2 .040 .998

1 .410 .965 .090 2 .044 .998

1 .432 .960 .095 2 .049 .997

1 .454 .955 .100 2 .054 .997

1 .475 .950 .105 2 .059 .997

1 .496 .945 .110 2 .065 .996

1 .516 .939 .115 2 .017 .995

1 .537 .933 .120 2 .076 .995

1 .556 .927

TABLE 18.7 Finite-queuing tables

X M D F

.125 2 .082 .994 1 .575 .920

.130 2 .089 .933 1 .594 .914

.135 2 .095 .933 1 .612 .907

.140 2 .102 .992 1 .630 .900

.145 3 .011 .999 2 .109 .991 1 .647 .892

.150 3 .012 .999 2 .115 .990 1 .664 .885

.155 3 .013 .999 2 .123 .989 1 .680 .877

.160 3 .015 .999 2 .130 .988 1 .695 .869

.165 3 .016 .999 2 .137 .987 1 .710 .861

.170 3 .017 .999 2 .145 .985 1 .725 .853

.180 3 .021 .999 2 .161 .983 1 .752 .836

.190 3 .024 .998 2 .117 .980 1 .778 .819

.200 3 .028 .998 2 .194 .976 1 .801 .801

.210 3 .032 .998 2 .211 .973 1 .822 .783

.220 3 .036 .997 2 .229 .969 1 .842 .765

.230 3 .041 .997 2 .247 .965 1 .860 .747

.240 3 .046 .996 2 .265 .960 1 .876 .730

.250 3 .052 .995 2 .284 .955 1 .890 .712

X M D F

.260 3 .058 .994 2 .303 .950 1 .903 .695

.270 3 .064 .994 2 .323 .944 1 .915 .677

.280 3 .071 .993 2 .342 .938 1 .925 .661

.290 4 .007 .999 3 .079 .992 2 .362 .932 1 .934 .644

.300 4 .008 .999 3 .086 .990 2 .382 .926 1 .942 .628

.310 4 .009 .999 3 .094 .989 2 .402 .919 1 .950 .613

.320 4 .010 .999 3 .103 .988 2 .422 .912 1 .956 .597

.330 4 .012 .999 3 .112 .986 2 .442 .904 1 .962 .583

.340 4 .013 .999 3 .121 .985 2 .462 .896 1 .967 .569

.360 4 .017 .998 3 .141 .981 2 .501 .880 1 .975 .542

.380 4 .021 .998 3 .163 .976 2 .540 .863 1 .981 .516

.400 4 .026 .997 3 .186 .972 2 .579 .845 1 .986 .493

.420 4 .031 .997 3 .211 .966 2 .616 .826 1 .989 .471

.440 4 .037 .996

X M D F

.440 3 .238 .960 2 .652 .807 1 .992 .451

.460 4 .045 .995 3 .266 .953 2 .686 .787 1 .994 .432

.480 4 .053 .994 3 .296 .945 2 .719 .767 1 .996 .415

.500 4 .063 .992 3 .327 .936 2 .750 .748 1 .997 .399

.520 4 .073 .991 3 .359 .927 2 .779 .728 1 .998 .384

.540 4 .085 .989 3 .392 .917 2 .806 .708 1 .998 .370

.560 4 .098 .986 3 .426 .906 2 .831 .689 1 .999 .357

.580 4 .113 .984 3 .461 .895 2 .854 .670 1 .999 .345

.600 4 .130 .981 3 .497 .883 2 .875 .652 1 .999 .333

.650 4 .179 .972 3 .588 .850 2 .918 .608 1 .999 .308

.700 4 .240 .960 3 .678 .815 2 .950 .568 1 .999 .286

.750 4 .316 .944 3 .763 .777 2 .972 .532

.800 4 .410 .924 3 .841 .739 2 .987 .500

(continued)

ste24102_ch18_782-821.indd 807ste24102_ch18_782-821.indd 807 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

808 Chapter Eighteen Management of Waiting Lines

TABLE 18.7 (Continued)

X M D F

.850 4 .522 .900 3 .907 .702 2 .995 .470

.900 4 .656 .871 3 .957 .666 2 .998 .444

.950 4 .815 .838 3 .989 .631

Population 10 .016 1 .144 .997 .019 1 .170 .996 .021 1 .188 .995 .023 1 .206 .994 .025 1 .224 .993 .026 1 .232 .992 .028 1 .250 .991 .030 1 .268 .990 .032 2 .033 .999

1 .285 .988 .034 2 .037 .999

1 .301 .986 .036 2 .041 .999

1 .320 .984 .038 2 .046 .999

1 .337 .982 .040 2 .050 .999

1 .354 .980 .042 2 .055 .999

1 .371 .978 .044 2 .060 .998

1 .388 .975 .046 2 .065 .998

1 .404 .973 .048 2 .071 .998

1 .421 .970 .050 2 .076 .998

1 .437 .967 .052 2 .082 .997

1 .454 .963 .054 2 .088 .997

1 .470 .960 .056 2 .094 .997

1 .486 .956 .058 2 .100 .996

1 .501 .953 .060 2 .106 .996

1 .517 .949 .062 2 .113 .996

1 .532 .945 .064 2 .119 .995

X M D F

.064 1 .547 .940 .066 2 .126 .995

1 .562 .936 .068 3 .020 .999

2 .133 .994 1 .577 .931

.070 3 .022 .999 2 .140 .994 1 .591 .926

.075 3 .026 .999 2 .158 .992 1 .627 .913

.080 3 .031 .999 2 .177 .990 1 .660 .899

.085 3 .037 .999 2 .196 .988 1 .692 .883

.090 3 .043 .998 2 .216 .986 1 .722 .867

.095 3 .049 .998 2 .237 .984 1 .750 .850

.100 3 .056 .998 2 .258 .981 1 .776 .832

.105 3 .064 .997 2 .279 .978 1 .800 .814

.110 3 .072 .997 2 .301 .974 1 .822 .795

.115 3 .081 .996 2 .324 .971 1 .843 .776

.120 4 .016 .999 3 .090 .995 2 .346 .967 1 .861 .756

.125 4 .019 .999 3 .100 .994 2 .369 .962 1 .878 .737

.130 4 .022 .999 3 .110 .994 2 .392 .958 1 .893 .718

.135 4 .025 .999 3 .121 .993

X M D F

.135 2 .415 .952 1 .907 .699

.140 4 .028 .999 3 .132 .991 2 .437 .947 1 .919 .680

.145 4 .032 .999 3 .144 .990 2 .460 .941 1 .929 .662

.150 4 .036 .998 3 .156 .989 2 .483 .935 1 .939 .644

.155 4 .040 .998 3 .169 .987 2 .505 .928 1 .947 .627

.160 4 .044 .998 3 .182 .986 2 .528 .921 1 .954 .610

.165 4 .049 .997 3 .195 .984 2 .550 .914 1 .961 .594

.170 4 .054 .997 3 .209 .982 2 .571 .906 1 .966 .579

.180 5 .013 .999 4 .066 .996 3 .238 .978 2 .614 .890 1 .975 .890

.190 5 .016 .999 4 .078 .995 3 .269 .973 2 .654 .873 1 .982 .522

.200 5 .020 .999 4 .092 .994 3 .300 .968 2 .692 .854 1 .987 .497

.210 5 .025 .999 4 .108 .992 3 .333 .961 2 .728 .835 1 .990 .474

X M D F

.220 5 .030 .998 4 .124 .990 3 .366 .954 2 .761 .815 1 .993 .453

.230 5 .037 .998 4 .142 .988 3 .400 .947 2 .791 .794 1 .995 .434

.240 5 .044 .997 4 .162 .986 3 .434 .938 2 .819 .774 1 .996 .416

.250 6 .010 .999 5 .052 .997 4 .183 .983 3 .469 .929 2 .844 .753 1 .997 .400

.260 6 .013 .999 5 .060 .996 4 .205 .980 3 .503 .919 2 .866 .732 1 .998 .384

.270 6 .015 .999 5 .070 .995 4 .228 .976 3 .537 .908 2 .886 .712 1 .999 .370

.280 6 .018 .999 5 .081 .994 4 .252 .972 3 .571 .896 2 .903 .692 1 .999 .357

.290 6 .022 .999 5 .093 .993 4 .278 .968 3 .603 .884 2 .918 .672 1 .999 .345

.300 6 .026 .998 5 .106 .991 4 .304 .963 3 .635 .872

(continued)

ste24102_ch18_782-821.indd 808ste24102_ch18_782-821.indd 808 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 809

TABLE 18.7 (Concluded)

X M D F

.300 2 .932 .653 1 .999 .333

.310 6 .031 .998 5 .120 .990 4 .331 .957 3 .666 .858 2 .943 .635

.320 6 .036 .998 5 .135 .988 4 .359 .952 3 .695 .845 2 .952 .617

.330 6 .042 .997 5 .151 .986 4 .387 .945 3 .723 .831 2 .961 .600

.340 7 .010 .999 6 .049 .997 5 .168 .983 4 .416 .938 3 .750 .816 2 .968 .584

.360 7 .014 .999 6 .064 .995 5 .205 .978 4 .474 .923 3 .798 .787 2 .978 .553

.380 7 .019 .999 6 .083 .993 5 .247 .971 4 .533 .906 3 .840 .758 2 .986 .525

.400 7 .026 .998

X M D F

.400 6 .105 .991 5 .292 .963 4 .591 .887 3 .875 .728 2 .991 .499

.420 7 .034 .993 6 .130 .987 5 .341 .954 4 .646 .866 3 .905 .700 2 .994 .476

.440 7 .045 .997 6 .160 .984 5 .392 .943 4 .698 .845 3 .928 .672 2 .996 .454

.460 8 .011 .999 7 .058 .995 6 .193 .979 5 .445 .930 4 .747 .822 3 .947 .646 2 .998 .435

.480 8 .015 .999 7 .074 .994 6 .230 .973 5 .499 .916 4 .791 .799 3 .961 .621 2 .998 .417

.500 8 .020 .999 7 .093 .992 6 .271 .966 5 .553 .901 4 .830 .775

X M D F

.500 3 .972 .598 2 .999 .400

.520 8 .026 .998 7 .115 .989 6 .316 .958 5 .606 .884 4 .864 .752 3 .980 .575 2 .999 .385

.540 8 .034 .997 7 .141 .986 6 .363 .949 5 .658 .867 4 .893 .729 3 .986 .555

.560 8 .044 .996 7 .171 .982 6 .413 .939 5 .707 .848 4 .917 .706 3 .991 .535

.580 8 .057 .995 7 .204 .977 6 .465 .927 5 .753 .829 4 .937 .684 3 .994 .517

.600 9 .010 .999 8 .072 .994 7 .242 .972 6 .518 .915 5 .795 .809 4 .953 .663 3 .996 .500

.650 9 .021 .999 8 .123 .988

X M D F

.650 7 .353 .954 6 .651 .878 5 .882 .759 4 .980 .614 3 .999 .461

.700 9 .040 .997 8 .200 .979 7 .484 .929 6 .772 .836 5 .940 .711 4 .992 .571

.750 9 .075 .994 8 .307 .965 7 .626 .897 6 .870 .792 5 .975 .666 4 .998 .533

.800 9 .134 .988 8 .446 .944 7 .763 .859 6 .939 .747 5 .991 .625 4 .999 .500

.850 9 .232 .979 8 .611 .916 7 .879 .818 6 .978 .705 5 .998 .588

.900 9 .387 .963 8 .785 .881 7 .957 .777 6 .995 .667

.950 9 .630 .938 8 .934 .841 7 .994 .737

Source: L. G. Peck and R. N. Hazelwood, Finite Queuing Tables (New York: John Wiley & Sons, 1958). Reprinted by permission.

From Table 18.7 , with N   �  5,  M   �  1, and X   �  .125,  D   �  .575 and F   �  .920.

a. Average number waiting, L   �   N (1  �   F )  �  5(1  �  .920)  �  .40 machine.

b. Expected number running, J   �   NF (1  �   X )  �  5(.920)(1  �  .125)  �  4.025 machines.

c. Downtime  �  Waiting time  �  Service time:

Waiting time, ( ) .40(10 70)

5 .40 6.957 minutesW

L T U

N L �

� �

� �

Downtime  �  6.957 minutes  �  10 minutes  �  16.957 minutes

d. Probability of not waiting 1 Probability of waiting

1

1 .575 .425

D

� �

� �

� � �

ste24102_ch18_782-821.indd 809ste24102_ch18_782-821.indd 809 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

810 Chapter Eighteen Management of Waiting Lines

Using the Excel template, the solution to Example 10 would appear as follows:

e celx mhhe.com/stevenson12e

Suppose that in Example 10 operators are paid $10 per hour, and machine downtime costs $16 per hour. Should the department add another operator if the goal is cost optimization?

E X A M P L E 1 1

S O L U T I O N Compare the total cost of the present system with the expected total cost of the proposed system:

M

Average Number Down,

N     �    J

Average Down Cost (per hour), (  N     �    J ) $16

Operator Cost (per hour)

Total Cost (per hour)

1 .975 $15.60 $10 $25.60

2 .651 10.42 20 30.42

Hence, the present system is superior because its total cost is less than the expected total cost using two operators.

18.8 CONSTRAINT MANAGEMENT Managers may be able to reduce waiting times by actively managing one or more system constraints. Typically, in the short term, the facility size and the number of servers are fixed resources. However, some other options might be considered:

Use temporary workers. Using temporary or part-time workers during busy periods may be possible. Trade-offs might involve training costs, quality issues, and perhaps slower service than would be provided by regular workers.

Shift demand. In situations where demand varies by time of day, or time of week, vari- able pricing strategies can be effective in smoothing demand more evenly on the system. Theaters use this option with lower prices to shift demand from busy times to slower times. Restaurants offer “early-bird specials” to accomplish this. Some retail businesses offer coupons that are valid only for certain (slow) days or times.

ste24102_ch18_782-821.indd 810ste24102_ch18_782-821.indd 810 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 811

Standardize the service. We saw the effect of constant service on waiting lines com- pared to nonconstant service (the number and time in line were cut in half). The more service can be standardized, the greater the impact on waiting lines.

Look for a bottleneck. One aspect of a process may be largely responsible for a slow service rate; improving that aspect of the process might yield a disproportionate increase in the service rate. Employees often have insights that can be exploited.

18.9 THE PSYCHOLOGY OF WAITING Despite management’s best efforts, in some instances it is not feasible to shorten waiting times. Nevertheless, steps can be taken in certain situations that make the situation more acceptable to those waiting in line, particularly when the waiting line consists of people. The importance of doing so should not be underestimated.

Studies have shown a difference—sometimes a remarkable difference— between the actual time customers spend waiting and their perceived time. Several factors can influence the differences. One is the reason for being in line (e.g., waiting for police or fire personnel, waiting at the emergency room, having other appointments or a plane or train to catch). Aside from those situations, where the level of anxiety can make even short waits seem long, in many instances management can reduce their customers’ perception of the waiting time.

If those waiting in line have nothing else to occupy their thoughts, they often tend to focus on the fact that they are waiting in line and usu- ally perceive the waiting time to be longer than the actual waiting time. Conversely, if something else occupies them while they wait, their per- ception of the waiting time is often less than their actual waiting time. Examples of distractions include in-flight snacks, meals or videos, and magazines and televisions in waiting rooms. Giving customers something to do while waiting, such as filling out forms, can make their wait seem productive. Of course, some customers provide their own distractions (e.g., they talk on their cell phones, text message, or play games on hand- held electronic devices). Another factor can be the level of comfort avail- able (e.g., standing versus sitting, waiting outside in the weather versus inside or under cover). Also, informing customers how long the wait will be can reduce anxiety. For example, call centers sometimes announce the expected waiting time before a service representative will be available, and restaurants usually are able to tell patrons how long they will wait to be seated.

Several of these approaches are employed at Disney theme parks, as illustrated in the following reading.

LO18.5 What are some psychological approaches to managing waiting lines, and why might a manager want to use them?

The Department of Motor Vehicles in Columbia, South Carolina, added greeters, placed television screens in waiting rooms, and installed computerized programs to cut wait times.

• Uncertain waits are longer than known, finite waits. • Unexplained waits are longer than explained waits. • Unfair waits are longer than equitable waits. • The more valuable the service, the longer the customer will wait. • Solo waits feel longer than group waits.

Source: David H. Maister, “The Psychology of Waiting Lines,” davidmaister.com , blog, September 8, 2008. Retrieved October 24, 2010.

David H. Maister’s classic article on the psychology of waiting included these pearls of wisdom about waiting that can serve as a guide to sys- tem designers and to those operating a system in which waiting lines of people occur:

• Occupied time feels shorter than unoccupied time. • People want to get started. • Anxiety makes waits seem longer.

READING David H. Maister on the Psychology of Waiting

its its

s. s.

ste24102_ch18_782-821.indd 811ste24102_ch18_782-821.indd 811 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

812 Chapter Eighteen Management of Waiting Lines

The implication in these ideas is that imagination and creativity can often play an important role in system design and that mathematical approaches are not the only ones worth considering.

more events, as well as the potential to gener- ate additional revenue as customers visit food concessions and souvenir shops. Another tactic is to sell passes that allow customers to enter the park earlier.

3. Keep customers informed. Signs are clearly posted that give approximate waiting times from that point, allowing the customers to make a decision of whether to join the line and setting expectations.

4. Exceed expectations. Waiting times are kept to less than estimated times, thereby exceeding customers’ expectations. Also, the event is to be worth the wait.

5. Other tactics. Disney maintains a comfortable waiting environment: Waiting lines are often inside, protected from weather conditions. Lines are kept moving, giving the impression of making progress. Attendants and signs direct customers to sections of the park that are less busy.

Source: Based in part on “Queuing Featuring Disney World,” McGraw-Hill Video Series.

Walt Disney theme parks are leaders in effectively managing waiting lines. Disney people present seminars on managing waiting lines. Their success can serve as a benchmark and provide valuable insights for a wide range of services.

Disney’s methods are particularly relevant when circumstances make it impossible to quickly add capacity to alleviate waiting times. Here are some of the tactics Disney employs to achieve customer satisfaction:

1. Provide distractions. Disney characters may entertain custom- ers, videos provide safety information and build anticipation for the event, vendors move along some lines selling food and drinks, and other vendors sell souvenirs.

2. Provide alternatives for those willing to pay a premium. Dis- ney offers its FastPass system, which allows customers to pay to reserve a time when they will be allowed to bypass the regular wait- ing line, sometimes using a separate entrance. This has the potential for increasing customer satisfaction by enabling customers to enjoy

READING Managing Waiting Lines at Disney World

c is to sell passes that

r- od

Analysis of waiting lines can be an important aspect of the design of service systems. Waiting lines have a tendency to form in such systems even when, in a macro sense, the system is underloaded. The arrival of customers at random times and variability of service times combine to create temporary overloads. When this happens, waiting lines appear. By the same token, at other times the servers are idle.

A major consideration in the analysis of queuing systems is whether the number of potential cus- tomers is limited (finite source) or whether entry to the system is unrestricted (infinite source). Five basic queuing models are described, four dealing with infinite-source populations and one dealing with finite-source populations. In general, the models assume that customer arrival rates can be described by a Poisson distribution and that service time can be described by a negative exponential distribution.

Choosing the Appropriate Model Infinite-Source Model. Use when entry to the system is unrestricted (open to the public).

SUMMARY

18.10 OPERATIONS STRATEGY

Managers must carefully assess the costs and benefits of various alternatives for capacity of service systems. Working to increase the processing rate may be a worthwhile option instead of increasing the number of servers. New processing equipment and/or processing methods may contribute to this goal. One important factor to consider is the possibility of reducing variability in processing times by increasing the degree of standardization of the service being provided. In fact, managers of all services would be wise to pursue this goal, not only for the benefits of reduced waiting times but also for benefits of standardizing server training and hence reducing those costs and times, and the potential for increased quality due to the decreased variety in service requirements.

Other approaches might involve efforts to shift some arrivals to “off-times” by using res- ervations systems, “early-bird” specials, senior discounts, or some of the approaches used by Disney to manage customer waiting.

It is also important to recognize that the models presented in this chapter involve assump- tions about the probability distributions of arrivals and service that may not be completely satisfied in practice.

ste24102_ch18_782-821.indd 812ste24102_ch18_782-821.indd 812 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 813

The basic relationship formulas can be used with an infinite-source model. There are formulas for system utilization, the average number or average time waiting for service, the average number being served, and the average number or time in the system. Refer to Figure 18.7 on p. 792 to help you connect with the appropriate formula. The formulas are on p. 792.

Single-channel model: Use when there is one server, team, or crew. See p. 793. Single-channel, constant service time. See p. 794. Multiple-channel model. Use when there are two or more independent servers, teams, or crews. See p. 795. Multiple-priority model. Use when service order is based on priority class. See p. 802.

Finite-Source Model. Use when entry to the system is restricted to system members. See p. 805.

1. Waiting lines occur because there is an imbalance between supply and demand in service systems.

2. One cause of imbalances is variability in service times and/or customer arrival times.

3. Two important approaches to managing waiting lines are reducing variability where possible by standardizing a process and/or altering the perceived waiting time.

KEY POINTS

channel, 787 finite-source situation, 786

infinite-source situation, 786 multiple-priority model, 802

queue discipline, 789 queuing theory, 784

KEY TERMS

SOLVED PROBLEMS

Use this approach for infinite-source problems:

1. Note the number of servers. If there is only one server, M   �  1. Use the basic relationship for- mulas in Figure 18.7 and the single-server formulas in Table 18.2 . If service is constant, use Formula 18–9 for L q . For M  > 1, use the basic relationship formulas in Figure 18.7 , the multiple- server values in Table 18.4 for L q and P 0 , and Formulas 18–12 and 18–13.

2. Determine the customer arrival rate and the service rate. If the arrival or service time is given instead of a rate, convert the time to a rate. For example, a service time of 10 minutes would convert to a service rate, � , of

� � [1/(10 minutes/customer)] (60 minutes/hour) 5 6 customers/hour

3. If multiple priorities are involved, use the Excel template on the Web site (preferred approach) or the formulas in Table 18.5 .

Infinite source. One of the features of a new machine shop will be a well-stocked tool crib. The manager of the shop must decide on the number of attendants needed to staff the crib. Attendants will receive $9 per hour in salary and fringe benefits. Mechanics’ time will be worth $30 per hour, which includes salary and fringe benefits plus lost work time caused by waiting for parts. Based on previous experience, the manager estimates requests for parts will average 18 per hour with a service capacity of 20 requests per hour per attendant. How many atten- dants should be on duty if the manager is willing to assume that arrival and service rates will be Poisson-distributed? (Assume the number of mechanics is very large, so an infinite-source model is appropriate.)

Problem 1

�   �  18 per hour

�   �  20 per hour

The solution requires a trial-and-error approach that reveals the total cost of feasible alternatives (i.e., a utilization less than 100 percent) and selection of the lowest-cost alternative. Note that the total-cost curve will always be U-shaped; increase the number of servers until the total cost shows an increase over the previous value. The optimum will be the number of servers that produced the previous total cost value. Thus,

Solution

ste24102_ch18_782-821.indd 813ste24102_ch18_782-821.indd 813 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

814 Chapter Eighteen Management of Waiting Lines

Hence, two servers will produce the lowest total cost.

Number of Servers, M  L q *

� �

� �L Lq s

$9 M Server Cost (per hour)

 $30 L s Mechanic Cost

(per hour) Total Cost (per hour)

1 ............. 8.1 8.1  �  0.9  �  9.0 $ 9 $270 $279

2 ............. 0.229 0.229  �  0.9  �  1.129 $18 $ 33.87 $ 52 †

3 ............. 0.03 0.03  �  0.9  �  0.93 $27 $ 27.9 $ 55 †

* L q from Table 18.4 , with r   �   � / �   �  18/20  �  .9.

† Rounded.

Total cost

0 1 2 3 Number of servers

$279

$52 $55

Infinite source. The following is a list of service times for three different operations: Problem 2

Operation Service Time

A 8 minutes

B 1.2 hours

C 2 days

a. Determine the service rate for each operation.

b. Would the calculated rates be different if these were interarrival times rather than service times?

a. The service rate is the reciprocal of service time. Thus, the rates are A: 1/8 customer per minute  �  .125 customer per minute, or .125/min   60 min/hr  �  

7.5 customers per hour B: 1/1.2 customer per hour  �  .833 customer per hour C: 1/2 customer per day  �  .50 customer per day

b. No. In either case, the rate is simply the reciprocal of the time.

Solution

Finite source. A group of 10 machines is loaded and unloaded by one of three servers. The machines run for an average of six minutes per cycle, and average time to unload and reload is nine minutes. Each time can be described by an exponential distribution. While running, the machines produce at a rate that would yield 16 units per hour if they did not have to pause to wait for a server and be loaded and unloaded. What is the average hourly output of each machine when waiting and serving are taken into account?

Problem 3

ste24102_ch18_782-821.indd 814ste24102_ch18_782-821.indd 814 11/23/13 10:35 AM11/23/13 10:35 AM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 815

T    �  9 minutes

6 minutes; 9

9 6 .60U x

T

T U � �

� �

� �

M   �  3 servers; from Table 18.7 , F   �  .500

N    �  10 machines

a. Compute the average number of machines running:

(1 ) 10(.500)(.40) 2J NF X� � � �

b. Determine the percentage of machines running, and multiply by output while running:

� � � �(16 per hour) 2

10 (16 per hour) units per hour per machine

J

N

Solution

1. In what kinds of situations is queuing analysis most appropriate?

2. Why do waiting lines form even though a service system is underloaded?

3. What are the most common measures of system performance in a queuing analysis?

4. What effect would decreasing arrival and service variability have on the effective capacity of a system?

5. What approaches do supermarkets use to offset variations in customer traffic intensity?

6. Contrast finite and infinite population sources.

7. Under what circumstances would a multiple-priority waiting system be appropriate?

8. In a multiple-channel system, what is the rationale for having customers wait in a single line, as is now being done in many banks and post offices, rather than multiple lines? ( Hint: The average waiting time is unaffected.)

9. What happens to the length of a waiting line in a highly variable (queuing) setting if a manager attempts to achieve a high percentage of capacity utilization?

DISCUSSION AND REVIEW QUESTIONS

1. What general trade-offs are involved in waiting line decisions?

2. Who needs to be involved in assessing the cost of customers waiting for service if the customers are (a) the general public and (b) employees of the organization?

3. How has technology had an impact on analyzing waiting line systems? How has technology improved waiting line performance?

TAKING STOCK

1. What benefits do psychological approaches to waiting lines have over other approaches?

2. Consider this situation: A manager is contemplating making changes to a single-server system that is expected to double the service rate, and still have just one server.

a. Would you (intuitively) think that doubling the service rate of a single-server system would cut the average waiting time in line in half?

b. For the sake of analysis, suppose the current system has an arrival rate of 8 customers per hour and a service rate of 10 customers per hour. If the service rate is doubled, what impact will that have on the average number waiting in line?

c. What are some managerial implications of your analysis?

3. There are certain instances where pooling of operations can be desirable. For example, a large factory may have two or more locations where mechanics can obtain special tools or equipment they occasionally need. The separate locations mean less travel time for workers, but sometimes there will be a waiting line at one location while servers are idle at another location. What factors should an analysis of this sort of situation take into account in deciding on whether to keep separate locations or pool servers and equipment at one central location?

CRITICAL THINKING

EXERCISES

ste24102_ch18_782-821.indd 815ste24102_ch18_782-821.indd 815 11/29/13 1:11 AM11/29/13 1:11 AM

Final PDF to printer

816 Chapter Eighteen Management of Waiting Lines

1. a. �   �  3 customers/hour �   �  5 customers/hour M   �  1

1) What is the system utilization? 2) What is the average number of customers waiting for service? 3) What is the average time customers wait in line for service?

b. Repair calls are handled by one repairman at a photocopy shop. Repair time, including travel time, is exponentially distributed, with a mean of two hours per call. Requests for copier repairs come in at a mean rate of three per eight-hour day (assume Poisson). Determine: 1) The average number of customers awaiting repairs. 2) System utilization. 3) The amount of time during an eight-hour day that the repairman is not out on a call. 4) The probability of two or more customers in the system.

c. An average of 18 customers arrive at a service center each hour. There are two servers on duty, and each server can process 12 customers per hour. 1) What is the system utilization? 2) What is the average number of customers in the system (waiting plus being served)? 3) What is the average time customers wait in line for service? 4) What is the average waiting time for customers who actually have to wait?

2. A vending machine dispenses hot chocolate or coffee. Service time is 30 seconds per cup and is constant. Customers arrive at a mean rate of 80 per hour, and this rate is Poisson-distributed. Determine: a. The average number of customers waiting in line. b. The average time customers spend in the system. c. The average number in the system.

3. Many of a bank’s customers use its automatic teller machine to transact business after normal banking hours. During the early evening hours in the summer months, customers arrive at a certain location at the rate of one every other minute. This can be modeled using a Poisson distribution. Each customer spends an average of 90 seconds completing his or her transactions. Transaction time is exponentially distributed. Determine: a. The average time customers spend at the machine, including waiting in line and completing

transactions. b. The probability that a customer will not have to wait upon arriving at the automatic teller

machine. c. The average number waiting to use the machine.

4. The following information pertains to telephone calls to a motel switchboard on a typical Tuesday.

PROBLEMS

Period

Incoming Rate (calls per minute)

Service Rate (calls per minute

per operator)

Number of

Operators

Morning 1.8 1.5 2

Afternoon 2.2 1.0 3

Evening 1.4 0.7 3

4. The owner of Eat Now Restaurant implemented an expanded menu early last year. The menu was a success, drawing many more customers, who seemed to like the increased variety of menu choices over that of the previous menu. But good news soon became bad news as long waiting lines began to deter customers, and business dropped off. Because of space and other limitations, there didn’t seem to be any viable options to consider. Then a customer mentioned a technique called mass customization that was being used in the company he worked for. He said it really streamlined processing, and maybe it could work for the restaurant.

Describe how that approach might work at the restaurant and why that could be expected to reduce waiting times. What costs would be involved in transitioning to such a system? What other approaches could be used to reduce waiting times?

5. Describe two examples of unethical behavior related to waiting line management, and state which ethical principles they violate.

ste24102_ch18_782-821.indd 816ste24102_ch18_782-821.indd 816 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 817

a. Determine the average time callers wait to have their calls answered for each period and the probability that a caller will have to wait for each period.

b. For each case in the previous problem, determine the maximum line length for a probability of 96 percent.

5. A small town with one hospital has two ambulances to supply ambulance service. Requests for ambulances during nonholiday weekends average .45 per hour and tend to be Poisson-distributed. Travel and assistance time averages two hours per call and follows an exponential distribution. Find:

a. System utilization. b. The average number of customers waiting. c. The average time customers wait for an ambulance. d. The probability that both ambulances will be busy when a call comes in.

6. Trucks are required to pass through a weighing station so that they can be checked for weight vio- lations. Trucks arrive at the station at the rate of 40 an hour between 7:00 p.m. and 9:00 p.m. Cur- rently two inspectors are on duty during those hours, each of whom can inspect 25 trucks an hour.

a. How many trucks would you expect to see at the weighing station, including those being inspected?

b. If a truck was just arriving at the station, about how many minutes could the driver expect to be at the station?

c. What is the probability that both inspectors would be busy at the same time? d. How many minutes, on average, would a truck that is not immediately inspected have to wait? e. What condition would exist if there was only one inspector? f. What is the maximum line length for a probability of .97?

7. The manager of a regional warehouse must decide on the number of loading docks to request for a new facility in order to minimize the sum of dock costs and driver-truck costs. The manager has learned that each driver-truck combination represents a cost of $300 per day and that each dock plus loading crew represents a cost of $1,100 per day.

a. How many docks should be requested if trucks arrive at the rate of three per day, each dock can handle five trucks per day, and both rates are Poisson?

b. An employee has proposed adding new equipment that would speed up the loading rate to 6 trucks per day. The equipment would cost $100 per day for each dock. Should the manager invest in the new equipment?

8. The parts department of a large automobile dealership has a counter used exclusively for mechanics’ requests for parts. The time between requests can be modeled by a negative exponential distribution that has a mean of five minutes. A clerk can handle requests at a rate of 15 per hour, and this can be modeled by a Poisson distribution that has a mean of 15. Suppose there are two clerks at the counter.

a. On average, how many mechanics would be at the counter, including those being served? b. What is the probability that a mechanic would have to wait for service? c. If a mechanic has to wait, how long would the average wait be? d. What percentage of time are the clerks idle? e. If clerks represent a cost of $20 per hour and mechanics a cost of $30 per hour, what number

of clerks would be optimal in terms of minimizing total cost?

9. One field representative services five customers for a computer manufacturer. Customers request assistance at an average (Poisson-distributed) rate of once every four working days. The field rep- resentative can handle an average (Poisson-distributed) of one call per day. Determine:

a. The expected number of customers waiting. b. The average length of time customers must wait from the initial request for service until the

service has been completed. c. The percentage of time the service rep will be idle. d. By how much would your answer to part a be reduced if a second field rep were added?

10. Two operators handle adjustments for a group of 10 machines. Adjustment time is exponentially dis- tributed and has a mean of 14 minutes per machine. The machines operate for an average of 86 min- utes between adjustments. While running, each machine can turn out 50 pieces per hour. Find:

a. The probability that a machine will have to wait for an adjustment. b. The average number of machines waiting for adjustment. c. The average number of machines being serviced. d. The expected hourly output of each machine, taking adjustments into account. e. Machine downtime represents a cost of $70 per hour; operator cost (including salary and

fringe benefits) is $15 per hour. What is the optimum number of operators?

ste24102_ch18_782-821.indd 817ste24102_ch18_782-821.indd 817 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

818 Chapter Eighteen Management of Waiting Lines

Class Arrivals per Hour

1 2

2 4

3 3

4 2

11. One operator services a bank of five machines. Machine running time and service time are both exponential. Machines run for an average of 90 minutes between service requirements, and ser- vice time averages 35 minutes. The operator receives $20 per hour in salary and fringe benefits, and machine downtime costs $70 per hour per machine.

a. If each machine produces 60 pieces per hour while running, find the average hourly output of each machine, when waiting and service times are taken into account.

b. Determine the optimum number of operators.

12. A milling department has 10 machines. Each operates an average of eight hours before requir- ing adjustment, which takes an average of two hours. While running, each machine can produce 40 pieces an hour.

a. With one adjuster, what is the net average hourly output per machine? b. If machine downtime cost is $80 per hour and adjuster cost is $30 per hour, how many adjust-

ers would be optimal?

13. Trucks arrive at the loading dock of a wholesale grocer at the rate of 1.2 per hour. A single crew consisting of two workers can load a truck in about 30 minutes. Crew members receive $10 per hour in wages and fringe benefits, and trucks and drivers reflect an hourly cost of $60. The man- ager is thinking of adding another member to the crew. The service rate would then be 2.4 trucks per hour. Assume rates are Poisson.

a. Would the third crew member be economical? b. Would a fourth member be justifiable if the resulting service capacity were 2.6 trucks per

hour?

14. Customers arriving at a service center are assigned to one of three categories, with category 1 given the highest priority. Records indicate that an average of nine customers arrive per hour and that one-third are assigned to each category. There are two servers, and each can process custom- ers at the rate of five per hour. Arrival and service rates can be described by Poisson distributions.

a. What is the utilization rate for this system? b. Determine the average waiting time for units in each class. c. Find the average number of customers in each class that are waiting for service.

15. A manager must determine requirements for waiting space for customers. A priority system is used to process customers, who are assigned to one of two classes when they enter the processing center. The highest-priority class has an arrival rate of four per hour; the other class has an arrival rate of two per hour. Both can be described as Poisson-distributed. There are two servers, and each can process customers in an average of 15 minutes.

a. What is the system utilization? b. Determine the number of customers of each class that are waiting for service. c. Determine the average waiting time for each class. d. If the manager could alter the assignment rules so that arrival rates of the two classes were

both 3/hour, what would be the revised average waiting time for each priority class?

16. A priority waiting system assigns arriving customers to one of four classes. Arrival rates (Poisson) of the classes are shown in the following table: Five servers process the customers, and each can handle three customers per hour.

a. What is the system utilization? b. What is the average wait for service by customers in the various classes? How many are waiting

in each class, on average? c. If the arrival rate of the second priority class could be reduced to three units per hour by shift-

ing some arrivals into the third priority class, how would your answers to part b change? d. What observations can you make based on your answers to part c?

ste24102_ch18_782-821.indd 818ste24102_ch18_782-821.indd 818 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 819

17. Referring to Problem 16, suppose that each server could handle four customers per hour. Answer the questions posed in the problem. Explain why the impact of reassigning customers is much less than in Problem 16.

18. During the morning hours at a catalog sales department, telephone calls come in at the rate (Poisson) of 40 per hour. Calls that cannot be answered immediately are put on hold. The system can handle eight callers on hold. If additional calls come in, they receive a busy signal. The three customer service representatives who answer the calls spend an average of three minutes with a customer.

a. What is the probability that a caller will get a busy signal? ( Hint: Solve for log K or ln K using trial and error.)

b. What is the probability that a customer will be put on hold?

The operations manager of a soon-to-open branch of a large bank is in the process of configuring teller operations. Currently some branches have a separate teller line for customers who have a single transac- tion, while other branches don’t have separate lines. The manager wants to avoid complaints about long waits that have been received at some branches. Because the demographics differ from location to location, a system that works at one branch won’t necessarily work at another.

The manager has obtained data on processing times from the bank’s home office and is ready to explore different options for configuring operations. (Fortunately she has her textbook and CD from when she took an operations management course at a nearby university.)

An average of 80 customers are processed during the noon hour. The average processing time for customers with a single transaction is 90 seconds, while the processing time for customers with multiple

transactions is 4 minutes. Sixty percent of the cus- tomers are expected to have multiple transactions.

One time that will get special attention is the noon hour on Friday. The plan is to have five tellers available. Under consideration are the following options:

a. Have one waiting line and have the first person in line go to the next available teller.

b. Have two waiting lines: one teller for customers who have a single transaction and four tellers who would handle customers who have multiple transactions.

Questions If you were the manager, which option would you select? Why? Explain the disparity between the results for the two options. What assumptions did you make in your analysis?

CASE Big Bank

giving the green light to longer traffic signals. Through the 1970s, the typical wait at a red light was 45 seconds or so. The wait started growing in the 1980s and 1990s. Today, 90-second spans aren’t uncommon, and some are inching near the three-minute mark. Many of these long lights are their longest only at rush hour, but that’s little solace to impatient travelers.

Law-abiding drivers stuck at the two-minute-36-second red light at the corner of DuPont Parkway and Frenchtown Road south of Wilming- ton, Del., take coffee breaks, work on crossword puzzles and, now and then, do some automotive hugging.

“You see couples getting a little more amorous than you’d expect at a traffic light,” says Paul Rada, manager of the nearby Quality Inn. “You’ve got to do something.” Mr. Rada himself has read the comics and eaten his lunch sitting at the light, he says. The truly desperate will

Anna Wilde Mathews At the corner of Fairfax County Parkway and Fair Lakes Parkway, drivers see red.

More than four minutes of it. Hanging over this crowded intersection in northern Virginia’s boom-

ing suburbs is one of the longest stoplights in the country. Washington- bound commuters curse it. Highflying tech executives making their way to appointments feel grounded. Prepared motorists bring breakfast to nibble while they wait. Occasionally, a gaggle of geese waddles across the road to a nearby pond, slowing things even more.

“You come out here sometimes, and it brings tears to your eyes, it’s so bad,” says Jeris J. White, the state transportation manager and former professional-football player who tackles traffic delays here.

Spread of Red It’s happening everywhere—red lights are get- ting longer. And longer. Cities and towns are quietly, albeit reluctantly,

READING Stopped at a Light? Why Not Read This, You May Have Time

the 1980s and 1990s

s. htt

(continued)

ste24102_ch18_782-821.indd 819ste24102_ch18_782-821.indd 819 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

820 Chapter Eighteen Management of Waiting Lines

yadda, yadda, yadda.” Las Vegas has a red light that stretches to two minutes and 45 seconds, although Mr. DeCamp says he tried to keep it from getting any longer. “I wasn’t proud of it,” he says. “I preferred not to advertise it.”

In Northern Virginia, Mr. White, who played cornerback for nine years for the Washington Redskins and other teams, has gone from stopping opposing teams to trying to get vehicles moving. He looks more like a referee on a recent weekday evening as he stands at the Fairfax County intersection, stopwatch in hand, timing a seemingly endless procession of glowing headlights and taillights.

“This is brutal,” he says, peering down a line of vehicles that stretches down Fair Lakes Parkway to the horizon, waiting for the light to change. One white sedan waits four minutes and 41 seconds to make a left turn; Mr. White explains why: Southbound traffic on the seven- lane Fairfax County Parkway hasn’t eased enough to trigger a change in the computer-controlled light. The light is set to switch automatically only when traffic thins on that road, which typically carries a heavier load than the intersecting one.

“You see any end in sight?” he asks. There is none, for now. The crossroads appears deceptively rural, with trees and grass at

each corner and the nearby pond. But it rests amid gleaming new con- dominiums, a shopping mall and an office park, and the roads are lined with signs urging drivers to stop and see the latest housing develop- ments under construction.

Standing on one corner, Mr. White offers running sports-style com- mentary on the traffic flow, groaning occasionally at a bad move. “The truck is going to run the red!” he shouts. “The truck ran the red!”

A Long Red He varies the light cycles at different times of the day, and uses the longest cycles only during peak rush-hour traffic. But at those times, he says, he has little choice but to keep the Fair Lakes Parkway red light so as to prevent miles-long backups on the Fairfax County Parkway.

Suddenly, Fair Lakes seems to be clearing up. Cars flow smoothly through the intersection and, by the time the light changes to red, none are left waiting. “This is beautiful!” Mr. White cheers. “We cleared the whole side street out. If it’s still that way at 6:30 or so, we can open the champagne.”

But Mr. White thinks the light still is too long, and he hopes to do something about it. As part of a computer-plotted plan to smooth traffic flows through 76 local intersections, the longest possible red light here will drop from four minutes and 47 seconds to three minutes and 15 seconds.

It’ll still be one of the longest reds anywhere, and Mr. White can’t be sure the change will stick. “The goal is to move the traffic,” he says. “If it doesn’t hold up, we’ll change it” back.

Source: Anna Wilde Mathews, “Stopped at a Light?” The Wall Street Journal, June 13, 2000, pp. A1 & A12. Copyright © 2000 Dow Jones & Co. Used with permission.

“jump out of cars and hit the pedestrian button,” hoping it will trigger a light change, adds Larry Koczak, a local mail carrier.

Reasons for the lengthening lights vary: More traffic. Wider streets. More lanes dedicated to left turns. And disagreement among traf- fic engineers who feel just as stuck as the drivers who endure these lights. “It’s crept up gradually,” says Scott Wainwright, a Montgomery County, Md., official who chairs a national engineering committee on traffic signals.

Longer red lights are intended to help keep busy intersections clear of anything approaching gridlock. In part, that’s because several sec- onds go to waste every time traffic has to start again when red turns to green.

Yielding to Temptation But longer lights can encourage antsy drivers to race through yellow lights and run reds, causing accidents and pileups that, in addition to risking injury and death, clog traffic even more. Each year, more than 1.8 million crashes occur at intersections, killing more than 7,800 peo- ple, the Federal Highway Administration says.

The federal government has launched a special “Stop Red Light Running” initiative, and localities are cracking down with hidden cam- eras that snap automatic pictures of scofflaws. For safety’s sake, many cities have built more time into stoplight cycles so, for a few seconds, lights at all sides of a given intersection are red—an “all-red” delay designed to clear stragglers and minimize collisions.

All-reds are a source of controversy among traffic engineers. Peter Parsonson, professor of civil engineering at Georgia Tech in Atlanta, says they add an extra margin of safety. But at Marquette University in Milwaukee, David Kuemmel, who is in the department of civil and environmental engineering, argues that the all-red sequence is being used “indiscriminately.”

The way to stop frustrated drivers from going through lights is not to make them wait longer, Mr. Kuemmel says. “That’s a pet peeve of mine. It’s an incentive for motorists to run the red light.” The disagreements are further complicated by the lack of conclusive research on the link between light length and crashes.

Many roads are sprouting more left-turn-only lanes, with their own green-arrow turn indicators to keep vehicles that want to turn from backing up forever. But that stretches the light-cycle length. And with extra lanes making streets wider, pedestrians need more time to cross, requiring longer greens to accommodate them.

Even in Las Vegas “In the old days, when you had two-lane roads, things were different,” says Gerry de Camp, a transportation consultant and former manager of the Las Vegas area computer traffic system. Now, he says, “you can have a three-lane left turn, plus a bus lane, and a 12-foot shoulder,

(concluded)

ste24102_ch18_782-821.indd 820ste24102_ch18_782-821.indd 820 11/22/13 1:56 PM11/22/13 1:56 PM

Final PDF to printer

Chapter Eighteen Management of Waiting Lines 821

Anderson, David R., Dennis J. Sweeney, Thomas A. Williams, Jeffrey D. Camm, and Skip Martin. An Introduction to Management Science: Quantitative Approaches to Decision Making. Revised Thirteenth Edition. Mason, OH: South-Western, 2012.

Buffa, Elwood. Operations Management. 3rd ed. New York: John Wiley & Sons, 1972.

Griffin, W. Queuing: Basic Theory and Applications. Columbus, OH: Grid Publishing, 1978.

Hillier, Frederick S. and Mark S. Hillier. Introduction to Management Science: A Modeling and Case Studies

Approach with Spreadsheets. 5th ed. New York: McGraw-Hill, 2014.

Ragsdale, Cliff T. Spreadsheet Modeling and Decision Analysis. 6th ed. Mason, OH: South-Western, 2011.

Stevenson, William J., and Ceyhun Ozgur. Introduction to Management Science with Spreadsheets. New York: McGraw-Hill/Irwin, 2006.

Taylor, Bernard. Introduction to Management Science. 11th ed. Upper Saddle River, NJ: Pearson Prentice Hall, 2013.

SELECTED BIBLIOGRAPHY AND FURTHER

READINGS

ste24102_ch18_782-821.indd 821ste24102_ch18_782-821.indd 821 11/29/13 1:11 AM11/29/13 1:11 AM

Final PDF to printer

822

C H A P T E R

19 Linear Programming CHAPTER OUTLINE

19.1 Introduction, 823

19.2 Linear Programming Models, 824 Model Formulation, 825

19.3 Graphical Linear Programming, 826 Outline of Graphical Procedure, 826

Plotting Constraints, 828

Identifying the Feasible Solution Space, 831

Plotting the Objective Function Line, 831

Redundant Constraints, 834

Solutions and Corner Points, 835

Minimization, 835

Slack and Surplus, 837

19.4 The Simplex Method, 838

19.5 Computer Solutions, 838 Solving LP Models Using MS Excel, 838

19.6 Sensitivity Analysis, 841 Objective Function Coefficient Changes, 841

Changes in the Right-Hand-Side (RHS) Value of a Constraint, 842

Case: Son, Ltd., 851 Custom Cabinets, Inc., 852

After completing this chapter, you should be able to:

LO19.1 Describe the type of problem that would lend itself to solution using linear programming.

LO19.2 Formulate a linear programming model from a description of a problem.

LO19.3 Solve simple linear programming problems using the graphical method.

LO19.4 Interpret computer solutions of linear programming problems.

LO19.5 Do sensitivity analysis on the solution of a linear programming problem.

LEARNING OBJECTIVES

ste24102_ch19_822-853.indd 822ste24102_ch19_822-853.indd 822 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

823

Linear programming is a powerful quantitative tool used by operations managers and other managers to obtain optimal solu- tions to problems that involve restrictions or limitations, such as budgets and available materials, labor, and machine time. These problems are referred to as constrained optimization problems. There are numerous examples of linear programming applications to such problems, including

• Establishing locations for emergency equipment and personnel that will minimize response time.

• Determining optimal schedules for airlines for planes, pilots, and ground personnel.

• Developing financial plans.

• Determining optimal blends of animal feed mixes.

• Determining optimal diet plans.

• Identifying the best set of worker–job assignments.

• Developing optimal production schedules.

• Developing shipping plans that will minimize shipping costs.

• Identifying the optimal mix of products in a factory.

• Performing production and service planning.

19.1 INTRODUCTION Linear programming (LP) techniques consist of a sequence of steps that will lead to an optimal solution to linear-constrained problems, if an optimum exists. There are a number of different linear programming techniques; some are special-purpose (i.e., used to find solutions for specific types of problems) and others are more general in scope. This chapter covers the two general-purpose solution techniques: graphical linear programming and computer solutions. Graphical linear programming provides a visual portrayal of many of the important concepts of linear programming. However, it is limited to problems with only two variables. In practice, computers are used to obtain solutions for problems, some of which involve a large number of variables.

ste24102_ch19_822-853.indd 823ste24102_ch19_822-853.indd 823 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

824 Chapter Nineteen Linear Programming

19.2 LINEAR PROGRAMMING MODELS Linear programming models are mathematical representations of constrained optimi- zation problems. These models have certain characteristics in common. Knowledge of these characteristics enables us to recognize problems that can be solved using linear programming. In addition, it also can help us formulate LP models. The characteristics can be grouped into two categories: components and assumptions. First, let’s consider the components.

Four components provide the structure of a linear programming model:

1. Objective function.

2. Decision variables.

3. Constraints.

4. Parameters.

Linear programming algorithms require that a single goal or objective, such as the maximization of profits, be specified. The two general types of objectives are maximiza- tion and minimization. A maximization objective might involve profits, revenues, effi- ciency, or rate of return. Conversely, a minimization objective might involve cost, time, distance traveled, or scrap. The objective function is a mathematical expression that can be used to determine the total profit (or cost, etc., depending on the objective) for a given solution.

Decision variables represent choices available to the decision maker in terms of amounts of either inputs or outputs. For example, some problems require choosing a combination of inputs to minimize total costs, while others require selecting a combination of outputs to maximize profits or revenues.

Constraints are limitations that restrict the alternatives available to decision makers. The three types of constraints are less than or equal to (�), greater than or equal to ( � ), and sim- ply equal to ( � ). A � constraint implies an upper limit on the amount of some scarce resource (e.g., machine hours, labor hours, materials) available for use. A �   constraint specifies a minimum that must be achieved in the final solution (e.g., must contain at least 10 percent real fruit juice, must get at least 30 MPG on the highway). The � constraint is more restric- tive in the sense that it specifies exactly what a decision variable should equal (e.g., make 200 units of product A). A linear programming model can consist of one or more constraints. The constraints of a given problem define the set of all feasible combinations of decision vari- ables; this set is referred to as the feasible solution space . Linear programming algorithms are designed to search the feasible solution space for the combination of decision variables that will yield an optimum in terms of the objective function.

An LP model consists of a mathematical statement of the objective and a mathematical statement of each constraint. These statements consist of symbols (e.g., x 1 ,  x 2 ) that represent the decision variables and numerical values, called parameters . The parameters are fixed values; the model is solved given those values.

Example 1 illustrates an LP model.

e celx mhhe.com/stevenson12e

SCREENCAM TUTORIAL

Objective function  Math- ematical statement of profit (or cost, etc.) for a given solution.

Decision variables  Amounts of either inputs or outputs.

Constraints  Limitations that restrict the available alternatives.

Feasible solution space  The set of all feasible combinations of decision variables as defined by the constraints.

Parameters  Numerical constants.

LO19.1 Describe the type of problem that would lend itself to solution using linear programming.

Here is an LP model of a situation that involves the production of three possible products, each of which will yield a certain profit per unit, and each requires a certain use of two resources that are in limited supply: labor and materials. The objective is to determine how much of each product to make to achieve the greatest possible profit while satisfying all constraints.

Decision variables

Quantity of product 1 to produce Quantity of product 2 to produce Quantity of product 3 to produce

Maximize 5 8 4 (profit) (Objective function)

1

2

3

1 2 3

x x x

x x x

⎧ ⎨ ⎪

⎩⎪

� � �

� �

E X A M P L E 1

ste24102_ch19_822-853.indd 824ste24102_ch19_822-853.indd 824 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

Chapter Nineteen Linear Programming 825

Subject to

Labor 2 4 8 250 hours

Material 7 6 5 100 pounds (Constraints)

Product 1 10 units

, , 0 (Nonnegativity constraints)

1 2 3

1 2 3

1

1 2 3

x x x

x x x

x

x x x

� � �

� � �

First, the model lists and defines the decision variables. These typically represent quanti- ties. In this case, they are quantities of three different products that might be produced.

Next, the model states the objective function. It includes every decision variable in the model and the contribution (profit per unit) of each decision variable. Thus, product x 1 has a profit of $5 per unit. The profit from product x 1 for a given solution will be 5 times the value of x 1 speci- fied by the solution; the total profit from all products will be the sum of the individual product profits. Thus, if x 1   �  10,  x 2   �  0, and x 3   �  6, the value of the objective function would be

5(10) 8(0) 4(6) 74� � �

The objective function is followed by a list (in no particular order) of three constraints. Each constraint has a right-hand-side numerical value (e.g., the labor constraint has a right- hand-side value of 250) that indicates the amount of the constraint and a relation sign that indicates whether that amount is a maximum (�), a minimum ( � ), or an equality ( � ). The left-hand side of each constraint consists of the variables subject to that particular constraint and a coefficient for each variable that indicates how much of the right-hand-side quantity one unit of the decision variable represents. For instance, for the labor constraint, one unit of x 1 will require two hours of labor. The sum of the values on the left-hand side of each constraint represents the amount of that constraint used by a solution. Thus, if x 1   �  10,  x 2   �  0, and x 3   �  6, the amount of labor used would be

2(10) 4(0) 8(6) 68 hours� � �

Because this amount does not exceed the quantity on the right-hand side of the constraint, it is said to be feasible.

Note that the third constraint refers to only a single variable; x 1 must be at least 10 units. Its implied coefficient is 1, although that is not shown.

Finally, there are the nonnegativity constraints. These are listed on a single line; they reflect the condition that no decision variable is allowed to have a negative value.

In order for LP models to be used effectively, certain assumptions must be satisfied:

1. Linearity: The impact of decision variables is linear in constraints and the objective function.

2. Divisibility: Noninteger values of decision variables are acceptable.

3. Certainty: Values of parameters are known and constant.

4. Nonnegativity: Negative values of decision variables are unacceptable.

LO19.2 Formulate a linear programming model from a description of a problem.

Model Formulation An understanding of the components of linear programming models is necessary for model formulation. This helps provide organization to the process of assembling information about a problem into a model.

Naturally, it is important to obtain valid information on what constraints are appropriate, as well as on what values of the parameters are appropriate. If this is not done, the usefulness of the model will be questionable. Consequently, in some instances, considerable effort must be expended to obtain that information.

In formulating a model, use the format illustrated in Example 1. Begin by identifying the decision variables. Very often, decision variables are “the quantity of” something, such as

ste24102_ch19_822-853.indd 825ste24102_ch19_822-853.indd 825 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

826 Chapter Nineteen Linear Programming

x 1   �  the quantity of product 1. Generally, decision variables have profits, costs, times, or a similar measure of value associated with them. Knowing this can help you identify the deci- sion variables in a problem.

Constraints are restrictions or requirements on one or more decision variables, and they refer to available amounts of resources such as labor, material, or machine time, or to minimal requirements, such as “Make at least 10 units of product 1.” It can be helpful to give a name to each constraint, such as “labor” or “material 1.” Let’s consider some of the different kinds of constraints you will encounter.

1. A constraint that refers to one or more decision variables. This is the most common kind of constraint. The constraints in Example 1 are of this type.

2. A constraint that specifies a ratio. For example, “The ratio of x 1 to x 2 must be at least 3 to 2.” To formulate this, begin by setting up the following ratio:

3

2 1

2

x

x �

Then, cross multiply, obtaining

2 31 2x x�

This is not yet in a suitable form because all variables in a constraint must be on the left-hand side of the inequality (or equality) sign, leaving only a constant on the right-hand side. To achieve this, we must subtract the variable amount that is on the right side from both sides. That yields

2 3 01 2x x� �

(Note that the direction of the inequality remains the same.) 3. A constraint that specifies a percentage for one or more variables relative to one or more

other variables. For example, “ x 1 cannot be more than 20 percent of the mix.” Suppose that the mix consists of variables x 1 ,  x 2 , and x 3 . In mathematical terms, this would be

.20( )1 1 2 3x x x x� � �

As always, all variables must appear on the left-hand side of the relationship. To accomplish that, we can expand the right-hand side, and then subtract the result from both sides. Expand- ing yields

.20 .20 .201 1 2 3x x x x� � �

Subtracting yields

.80 .20 .20 01 2 3x x x� � �

Once you have formulated a model, the next task is to solve it. The following sections describe two approaches to problem solution: graphical solutions and computer solutions.

19.3 GRAPHICAL LINEAR PROGRAMMING Graphical linear programming is a method for finding optimal solutions to two-variable problems. This section describes that approach.

Outline of Graphical Procedure The graphical method of linear programming plots the constraints on a graph and identifies an area that satisfies all of the constraints. The area is referred to as the feasible solution space. Next, the objective function is plotted and used to identify the optimal point in the feasible solution space. The coordinates of the point can sometimes be read directly from the graph, although generally an algebraic determination of the coordinates of the point is necessary.

Graphical linear program- ming  Graphical method for finding optimal solutions to two-variable problems.

LO19.3 Solve simple linear programming problems using the graphical method.

ste24102_ch19_822-853.indd 826ste24102_ch19_822-853.indd 826 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

Chapter Nineteen Linear Programming 827

The general procedure followed in the graphical approach is as follows:

1. Set up the objective function and the constraints in mathematical format.

2. Plot the constraints.

3. Identify the feasible solution space.

4. Plot the objective function.

5. Determine the optimum solution.

The technique can best be illustrated through solution of a typical problem. Consider the problem described in Example 2.

General description: A firm that assembles computers and computer equipment is about to start production of two new types of microcomputers. Each type will require assembly time, inspection time, and storage space. The amounts of each of these resources that can be devoted to the production of the microcomputers is limited. The manager of the firm would like to determine the quantity of each microcomputer to produce in order to maximize the profit generated by sales of these microcomputers.

Additional information: In order to develop a suitable model of the problem, the manager has met with design and production personnel. As a result of those meetings, the manager has obtained the following information:

Type 1 Type 2

Profit per unit $60 $50

Assembly time per unit 4 hours 10 hours

Inspection time per unit 2 hours 1 hour

Storage space per unit 3 cubic feet 3 cubic feet

The manager also has acquired information on the availability of company resources. These (daily) amounts are as follows:

Resource Amount Available

Assembly time 100 hours

Inspection time 22 hours

Storage space 39 cubic feet

The manager met with the firm’s marketing manager and learned that demand for the microcomputers was such that whatever combination of these two types of microcomputers is produced, all of the output can be sold.

E X A M P L E 2

In terms of meeting the assumptions, it would appear that the relationships are linear: The contribution to profit per unit of each type of computer and the time and storage space per unit of each type of computer are the same regardless of the quantity produced. Therefore, the total impact of each type of computer on the profit and each constraint is a linear function of the quantity of that variable. There may be a question of divisibility because, presumably, only whole units of computers will be sold. However, because this is a recurring process (i.e., the computers will be produced daily; a noninteger solution such as 3.5 computers per day will result in 7 computers every other day), this does not seem to pose a problem. The question of certainty cannot be explored here; in practice, the manager could be questioned to determine if there are any other possible constraints and whether the values shown for assembly times, and so forth, are known with certainty. For the purposes of discussion, we will assume cer- tainty. Last, the assumption of nonnegativity seems justified; negative values for production quantities would not make sense.

Because we have concluded that linear programming is appropriate, let us now turn our attention to constructing a model of the microcomputer problem. First, we must define the

ste24102_ch19_822-853.indd 827ste24102_ch19_822-853.indd 827 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

828 Chapter Nineteen Linear Programming

decision variables. Based on the statement “The manager .  .  . would like to determine the quantity of each microcomputer to produce,” the decision variables are the quantities of each type of computer. Thus,

quantity of type 1 to produce

quantity of type 2 to produce

1

2

x

x

Next, we can formulate the objective function. The profit per unit of type 1 is listed as $60, and the profit per unit of type 2 is listed as $50, so the appropriate objective function is

Maximize 60 501 2Z x x� �

where Z is the value of the objective function, given values of x 1 and x 2 . Theoretically, a math- ematical function requires such a variable for completeness. However, in practice, the objec- tive function often is written without the Z, as sort of a shorthand version. (That approach is underscored by the fact that computer input does not call for Z: It is understood. The output of a computerized model does include a Z, though.)

Now for the constraints. There are three resources with limited availability: assembly time, inspection time, and storage space. The fact that availability is limited means that these con- straints will all be �  constraints. Suppose we begin with the assembly constraint. The type 1 microcomputer requires 4 hours of assembly time per unit, whereas the type 2 microcomputer requires 10 hours of assembly time per unit. Therefore, with a limit of 100 hours available, the assembly constraint is

4 10 100 hours1 2x x� �

Similarly, each unit of type 1 requires 2 hours of inspection time, and each unit of type 2 requires 1 hour of inspection time. With 22 hours available, the inspection constraint is

2 1 221 2x x� �

( Note: The coefficient of 1 for x 2 need not be shown. Thus, an alternative form for this con- straint is 2 x 1   �   x 2  � 22.) The storage constraint is determined in a similar manner:

3 3 391 2x x� �

There are no other system or individual constraints. The nonnegativity constraints are

, 01 2x x �

In summary, the mathematical model of the microcomputer problem is

quantity of type 1 to produce

quantity of type 2 to produce

1

2

x

x

Maximize 60 501 2x x� Subject to

Assembly 4 10 100 hours

Inspection 2 1 22 hours

Storage 3 3 39 cubic feet

, 0

1 2

1 2

1 2

1 2

x x

x x

x x

x x

� �

� �

� �

� The next step is to plot the constraints.

Plotting Constraints Begin by placing the nonnegativity constraints on a graph, as in Figure 19.1 . The procedure for plotting the other constraints is simple:

1. Replace the inequality sign with an equal sign. This transforms the constraint into an equation of a straight line.

2. Determine where the line intersects each axis.

ste24102_ch19_822-853.indd 828ste24102_ch19_822-853.indd 828 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

Chapter Nineteen Linear Programming 829

a. To find where it crosses the x 2 axis, set x 1 equal to zero and solve the equation for the value of x 2 .

b. To find where it crosses the x 1 axis, set x 2 equal to zero and solve the equation for the value of x 1 .

3. Mark these intersections on the axes, and connect them with a straight line. ( Note: If a constraint has only one variable, it will be a vertical line on a graph if the variable is x 1 , or a horizontal line if the variable is x 2 .)

4. Indicate by shading (or by arrows at the ends of the constraint line) whether the inequality is greater than or less than. (A general rule to determine which side of the line satisfies the inequality is to pick a point that is not on the line, such as 0,0, solve the equation using these values, and see whether it is greater than or less than the constraint amount.)

5. Repeat steps 1–4 for each constraint.

Consider the assembly time constraint:

4 10 1001 2x x� �

Removing the inequality portion of the constraint produces this straight line:

4 10 1001 2x x� �

Next, identify the points where the line intersects each axis, as step 2 describes. Thus with x 2   �  0, we find

4 10(0) 1001x � �

Solving, we find that 4 x 1   �  100, so x 1   �  25 when x 2   �  0. Similarly, we can solve the equation for x 2 when x 1   �  0:

4(0) 10 1002x� �

Solving for x 2 , we find x 2   �  10 when x 1   �  0. Thus, we have two points: x 1   �  0,  x 2   �  10, and x 1   �  25,  x 2   �  0. We can now add this line

to our graph of the nonnegativity constraints by connecting these two points (see Figure 19.2 ). Next we must determine which side of the line represents points that are less than 100. To

do this, we can select a test point that is not on the line, and we can substitute the x 1 and x 2 val- ues of that point into the left-hand side of the equation of the line. If the result is less than 100, this tells us that all points on that side of the line are less than the value of the line (e.g., 100). Conversely, if the result is greater than 100, this indicates that the other side of the line repre- sents the set of points that will yield values that are less than 100. A relatively simple test point to use is the origin (i.e., x 1   �  0,  x 2   �  0). Substituting these values into the equation yields

4(0) 10(0) 0� �

FIGURE 19.1 Graph showing the nonnegativity constraints

Nonnegativity constraints

Area of feasibility

Q u

an ti

ty o

f ty

p e

2 Quantity of type 1

0

= 0x2

= 0x1

x1

x2

ste24102_ch19_822-853.indd 829ste24102_ch19_822-853.indd 829 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

830 Chapter Nineteen Linear Programming

Obviously this is less than 100. Hence, the side of the line closest to the origin represents the “less than” area (i.e., the feasible region).

The feasible region for this constraint and the nonnegativity constraints then becomes the shaded portion shown in Figure 19.3 .

For the sake of illustration, suppose we try one other point, say x 1   �  10,  x 2   �  10. Substitut- ing these values into the assembly constraint yields

4(10) 10(10) 140� �

Clearly this is greater than 100. Therefore, all points on this side of the line are greater than 100 (see Figure 19.4 ).

Continuing with the problem, we can add the two remaining constraints to the graph. For the inspection constraint:

1. Convert the constraint into the equation of a straight line by replacing the inequality sign with an equality sign:

2 1 22 becomes 2 1 221 2 1 2x x x x� � � �

2. Set x 1 equal to zero and solve for x 2 :

2(0) 1 222x� �

Solving, we find x 2   �  22. Thus, the line will intersect the x 2 axis at 22.

3. Next, set x 2 equal to zero and solve for x 1 :

2 1(0) 221x � �

Solving, we find x 1   �  11. Thus, the other end of the line will intersect the x 1 axis at 11.

4. Add the line to the graph (see Figure 19.5 ).

Note that the area of feasibility for this constraint is below the line ( Figure 19.5 ). Again the area of feasibility at this point is shaded in for illustration, although when graphing problems, it is more practical to refrain from shading in the feasible region until all constraint lines have been drawn. However, because constraints are plotted one at a time, using a small arrow at the end of each constraint to indicate the direction of feasibility can be helpful.

The storage constraint is handled in the same manner:

1. Convert it into an equality:

3 3 391 2x x� �

2. Set x 1 equal to zero and solve for x 2 :

3(0) 3 392x� �

FIGURE 19.3 The feasible region, given the first constraint and the nonnegativity constraints

25 x10

10

x2

Assembly timeFeasible region

FIGURE 19.2 Plot of the first constraint (assembly time)

25 x10

10

x2

+ 10 = 100

x 1

x 2

4

ste24102_ch19_822-853.indd 830ste24102_ch19_822-853.indd 830 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

Chapter Nineteen Linear Programming 831

Solving, x 2   �  13. Thus, x 2   �  13 when x 1   �  0.

3. Set x 2 equal to zero and solve for x 1 :

3 3(0) 391x � �

Solving, x 1   �  13. Thus, x 1   �  13 when x 2   �  0.

4. Add the line to the graph (see Figure 19.6 ).

Identifying the Feasible Solution Space The feasible solution space is the set of all points that satisfies all constraints. (Recall that the x 1 and x 2 axes form nonnegativity constraints.) The heavily shaded area shown in Figure 19.6 is the feasible solution space for our problem.

The next step is to determine which point in the feasible solution space will produce the optimal value of the objective function. This determination is made using the objective function.

Plotting the Objective Function Line Plotting an objective function line involves the same logic as plotting a constraint line: Deter- mine where the line intersects each axis. Recall that the objective function for the microcom- puter problem is

60 501 2x x�

FIGURE 19.4 The point (10, 10) is above the constraint line

25 x10

10

10

x2

+ 10 = 100

x 1

x 2

4 • (10,10)

FIGURE 19.5 Partially completed graph, showing the assembly, inspection, and nonnegativity constraints

25 x10

10

22

11

x2

Inspection

Assembly

Feasible for inspection but not for assembly

Feasible for both assembly and inspection

Feasible for assembly but not for inspection

FIGURE 19.6 Completed graph of the microcomputer problem showing all constraints and the feasible solution space

25 x10

10

22

11 13

13

x2

InspectionStorage

Feasible solution space

Assembly

ste24102_ch19_822-853.indd 831ste24102_ch19_822-853.indd 831 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

832 Chapter Nineteen Linear Programming

This is not an equation because it does not include an equal sign. We can get around this by simply setting it equal to some quantity. Any quantity will do, although one that is evenly divisible by both coefficients is desirable.

Suppose we decide to set the objective function equal to 300. That is,

60 50 3001 2x x� �

We can now plot the line on our graph. As before, we can determine the x 1 and x 2 intercepts of the line by setting one of the two variables equal to zero, solving for the other, and then reversing the process. Thus, with x 1   �  0, we have

60(0) 50 3002x� �

Solving, we find x 2   �  6. Similarly, with x 2   �  0, we have

60 50(0) 3001x � �

Solving, we find x 1   �  5. This line is plotted in Figure 19.7 . The profit line can be interpreted in the following way: It is an isoprofit line; every point

on the line (i.e., every combination of x 1 and x 2 that lies on the line) will provide a profit of $300. We can see from the graph many combinations that are both on the $300 profit line and within the feasible solution space. In fact, considering noninteger as well as integer solutions, the possibilities are infinite.

Suppose we now consider another line, say the $600 line. To do this, we set the objective function equal to this amount. Thus,

60 50 6001 2x x� �

Solving for the x 1 and x 2 intercepts yields these two points:

intercept intercept

10 0

0 12

1 2

1 1

2 2

x x

x x

x x

� �

� �

This line is plotted in Figure  19.8 , along with the previous $300 line for purposes of comparison.

Two things are evident in Figure 19.8 regarding the profit lines. One is that the $600 line is farther from the origin than the $300 line; the other is that the two lines are parallel. The lines are parallel because they both have the same slope. The slope is not affected by the right side of the equation. Rather, it is determined solely by the coefficients 60 and 50. It would be

FIGURE 19.7 Microcomputer problem with $300 profit line added

25 x10

10

22

115

6

13

13

x2

InspectionStorage

Profit = $300

Assembly

FIGURE 19.8 Microcomputer problem with profit lines of $300 and $600

25 x10

10

12

22

11105

6

13

13

x2

InspectionStorage

Profit = $300 Profit = $600

Assembly

ste24102_ch19_822-853.indd 832ste24102_ch19_822-853.indd 832 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

Chapter Nineteen Linear Programming 833

correct to conclude that regardless of the quantity we select for the value of the objective func- tion, the resulting line will be parallel to these two lines. Moreover, if the amount is greater than 600, the line will be even farther away from the origin than the $600 line. If the value is less than 300, the line will be closer to the origin than the $300 line. And if the value is between 300 and 600, the line will fall between the $300 and $600 lines. This knowledge will help in determining the optimal solution.

Consider a third line, one with the profit equal to $900. Figure 19.9 shows that line along with the previous two profit lines. As expected, it is parallel to the other two, and even far- ther away from the origin. However, the line does not touch the feasible solution space at all. Consequently, there is no feasible combination of x 1 and x 2 that will yield that amount of profit. Evidently, the maximum possible profit is an amount between $600 and $900, which we can see by referring to Figure 19.9 . We could continue to select profit lines in this manner, and eventually, we could determine an amount that would yield the greatest profit. However, there is a much simpler alternative. We can plot just one line, say the $300 line. We know that all other lines will be parallel to it. Consequently, by moving this one line parallel to itself we can “test” other profit lines. We also know that as we move away from the origin, the profits get larger. What we want to know is how far the line can be moved out from the origin and still be touching the feasible solution space, and the values of the decision variables at that point of greatest profit (i.e., the optimal solution). Locate this point on the graph by placing a straight edge along the $300 line (or any other convenient line) and sliding it away from the origin, being careful to keep it parallel to the line. This approach is illustrated in Figure 19.10 .

Once we have determined where the optimal solution is in the feasible solution space, we must determine the values of the decision variables at that point. Then, we can use that infor- mation to compute the profit for that combination.

Note that the optimal solution is at the intersection of the inspection boundary and the stor- age boundary (see Figure 19.10 ). In other words, the optimal combination of x 1 and x 2 must satisfy both boundary (equality) conditions. We can determine those values by solving the two equations simultaneously. The equations are

Inspection 2 1 22

Storage 3 3 39

1 2

1 2

x x

x x

� �

� �

The idea behind solving two simultaneous equations is to algebraically eliminate one of the unknown variables (i.e., to obtain an equation with a single unknown). This can be accom- plished by multiplying the constants of one of the equations by a fixed amount and then adding (or subtracting) the modified equation from the other. (Occasionally, it is easier to multiply each equation by a fixed quantity.) For example, we can eliminate x 2 by multiplying

FIGURE 19.9 Microcomputer problem with profit lines of $300, $600, and $900

25 x10

10

12

22

18

11105

6

13 15

13

x2

Inspection

Storage

$300

$600 $900

Assembly

FIGURE 19.10 Finding the optimal solution to the microcomputer problem

25 x10

10

22

115

6

13

13

x2

Inspection

$300 Assembly Storage

(last line)

Optimal solution

ste24102_ch19_822-853.indd 833ste24102_ch19_822-853.indd 833 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

834 Chapter Nineteen Linear Programming

the inspection equation by 3 and then subtracting the storage equation from the modified inspection equation. Thus,

3(2 1 22) becomes 6 3 661 2 1 2x x x x� � � �

Subtracting the storage equation from this produces

6 3 66

(3 3 39)

3 0 27

1 2

1 2

1 2

x x

x x

x x

+ = + = + =

Solving the resulting equation yields x 1   �  9. The value of x 2 can be found by substituting x 1   �  9 into either of the original equations or the modified inspection equation. Suppose we use the original inspection equation. We have

2(9) 1 222x� �

Solving, we find x 2   �  4. Hence, the optimal solution to the microcomputer problem is to produce nine type 1 com-

puters and four type 2 computers per day. We can substitute these values into the objective function to find the optimal profit:

$60(9) $50(4) $740� �

Hence, the last line—the one that would last touch the feasible solution space as we moved away from the origin parallel to the $300 profit line—would be the line where profit equaled $740.

In this problem, the optimal values for both decision variables are integers. This will not always be the case; one or both of the decision variables may turn out to be noninteger. In some situations noninteger values would be of little consequence. This would be true if the decision variables were measured on a continuous scale, such as the amount of water, sand, sugar, fuel oil, time, or distance needed for optimality, or if the contribution per unit (profit, cost, etc.) were small, as with the number of nails or ball bearings to make. In some cases, the answer would simply be rounded down (maximization problems) or up (minimization problems) with very little impact on the objective function. Here, we assume that noninteger answers are acceptable as such.

Let’s review the procedure for finding the optimal solution using the objective function approach:

1. Graph the constraints.

2. Identify the feasible solution space.

3. Set the objective function equal to some amount that is divisible by each of the objec- tive function coefficients. This will yield integer values for the x 1 and x 2 intercepts and simplify plotting the line. Often, the product of the two objective function coefficients provides a satisfactory line. Ideally, the line will cross the feasible solution space close to the optimal point, and it will not be necessary to slide a straight edge because the optimal solution can be readily identified visually.

4. After identifying the optimal point, determine which two constraints intersect there. Solve their equations simultaneously to obtain the values of the decision variables at the optimum.

5. Substitute the values obtained in the previous step into the objective function to deter- mine the value of the objective function at the optimum.

Redundant Constraints In some cases, a constraint does not form a unique boundary of the feasible solution space. Such a constraint is called a redundant constraint. Two such constraints are illustrated in Figure 19.11 . Note that a constraint is redundant if it meets the following test: Its removal would not alter the feasible solution space.

Redundant constraint   A constraint that does not form a unique boundary of the feasible solution space.

ste24102_ch19_822-853.indd 834ste24102_ch19_822-853.indd 834 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

Chapter Nineteen Linear Programming 835

When a problem has a redundant constraint, at least one of the other constraints in the problem is more restrictive than the redundant constraint.

Solutions and Corner Points The feasible solution space in graphical linear programming is typically a polygon. More- over, the solution to any problem will always be at a corner point (intersection of constraints) of the polygon. It is possible to determine the coordinates of each corner point of the fea- sible solution space, and use those values to compute the value of the objective function at those points. Because the solution is always at a corner point, comparing the values of the objective function at the corner points and identifying the best one (e.g., the maximum value) is another way to identify the optimal corner point. Using the graphical approach, it is much easier to plot the objective function and use that to identify the optimal corner point. How- ever, for problems that have more than two decision variables, and the graphical method isn’t appropriate, the “enumeration” approach is used to find the optimal solution.

With the enumeration approach , the coordinates of each corner point are determined, and then each set of coordinates is substituted into the objective function to determine its value at that corner point. After all corner points have been evaluated, the one with the maximum or minimum value (depending on whether the objective is to maximize or minimize) is identified as the optimal solution.

Thus, in the microcomputer problem, the corner points are x 1   �  0,  x 2   �  10,  x 1   �  11,  x 2   �  0 (by inspection; see Figure 19.10 ), and x 1   �  9,  x 2   �  4 and x 1   �  5,  x 2   �  8 (using simultaneous equations, as illustrated on pages 833–834). Substituting into the objective function, the values are $500 for (0,10); $740 for (9,4); $660 for (11,0), and $700 for (5,8). Because (9,4) yields the highest value, that corner point is the optimal solution.

In some instances, the objective function will be parallel to one of the constraint lines that forms a boundary of the feasible solution space. When this happens, every combination of x 1 and x 2 on the segment of the constraint that touches the feasible solution space represents an optimal solution. Hence, there are multiple optimal solutions to the problem. Even in such a case, the solution will also be a corner point—in fact, the solution will be at two corner points: those at the ends of the segment that touches the feasible solution space. Figure 19.12 illus- trates an objective function line that is parallel to a constraint line.

Minimization Graphical minimization problems are quite similar to maximization problems. There are, how- ever, two important differences. One is that at least one of the constraints must be of the � or �  variety. This causes the feasible solution space to be away from the origin. The other differ- ence is that the optimal point is the one closest to the origin. We find the optimal corner point by sliding the objective function (which is an isocost line) toward the origin instead of away from it.

Enumeration approach   Substituting the coordinates of each corner point into the objec- tive function to determine which corner point is optimal.

FIGURE 19.11 Examples of redundant constraints

30 x10

20

25

10

x2

+ = 20

x 1

x 2

= 25x2

2

+ 3 = 60

x 1

x 2

2

Redundant

Feasible solution space

ste24102_ch19_822-853.indd 835ste24102_ch19_822-853.indd 835 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

836 Chapter Nineteen Linear Programming

FIGURE 19.12 Some LP problems have multiple optimal solutions

x10

x2

Objective function

Optimal line segment

Solve the following problem using graphical linear programming.

Minimize 8 12

Subject to 5 2 20

4 3 24

2

, 0

1 2

1 2

1 2

2

1 2

Z x x

x x

x x

x

x x

� �

� �

� �

E X A M P L E 3

S O L U T I O N 1. Plot the constraints (shown in Figure 19.13 ). a. Change constraints to equalities.

b. For each constraint, set x 1   �  0 and solve for x 2 , then set x 2   �  0 and solve for x 1 .

c. Graph each constraint. Note that x 2   �  2 is a horizontal line parallel to the x 1 axis and 2 units above it.

2. Shade the feasible solution space (see Figure 19.13 ).

3. Plot the objective function.

a. Select a value for the objective function that causes it to cross the feasible solution space. Try 8  �  12  �  96; 8 x 1   �  12 x 2   �  96 (acceptable).

b. Graph the line (see Figure 19.14 ). 4. Slide the objective function toward the origin, being careful to keep it parallel to the

original line.

5. The optimum (last feasible point) is shown in Figure 19.14 . The x 2 coordinate ( x 2   �  2) can be determined by inspection of the graph. Note that the optimum point is at the inter- section of the line x 2   �  2 and the line 4 x 1   �  3 x 2   �  24. Substituting the value of x 2   �  2 into the latter equation will yield the value of x 1 at the intersection:

4 3(2) 24 4.51 1x x� � �

Thus, the optimum is x 1   �  4.5 units and x 2   �  2.

6. Compute the minimum cost:

8 12 8(4.5) 12(2) 601 2x x� � � �

ste24102_ch19_822-853.indd 836ste24102_ch19_822-853.indd 836 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

Chapter Nineteen Linear Programming 837

Slack and Surplus If a constraint forms the optimal corner point of the feasible solution space, it is called a binding constraint . In effect, it limits the value of the objective function; if the constraint could be relaxed (less restrictive), an improved solution would be possible. For constraints that are not binding, making them less restrictive will have no impact on the solution.

If the optimal values of the decision variables are substituted into the left-hand side of a binding constraint, the resulting value will exactly equal the right-hand value of the con- straint. However, there will be a difference with a nonbinding constraint. If the left-hand side is greater than the right-hand side, we say that there is surplus ; if the left-hand side is less than the right-hand side, we say that there is slack . Slack can only occur in a �  constraint; it is the amount by which the left-hand side is less than the right-hand side when the optimal values of the decision variables are substituted into the left-hand side. And surplus can only occur in a �   constraint; it is the amount by which the left-hand side exceeds the right-hand side of the constraint when the optimal values of the decision variables are substituted into the left-hand side.

For example, suppose the optimal values for a problem are x 1   �  10 and x 2   �  20. If one of the constraints is

3 2 1001 2x x� �

substituting the optimal values into the left-hand side yields

3(10) 2(20) 70� �

Because the constraint is �, the difference between the values of 100 and 70 (i.e., 30) is slack. Suppose the optimal values had been x 1   �  20 and x 2   �  20. Substituting these values into the left-hand side of the constraint would yield 3(20)  �  2(20)  �  100. Because the left-hand side equals the right-hand side, this is a binding constraint; slack is equal to zero.

Now consider this constraint:

4 501 2x x� �

Suppose the optimal values are x 1   �  10 and x 2   �  15; substituting into the left-hand side yields

4(10) 15 55� �

Because this is a �   constraint, the difference between the left- and right-hand-side values is surplus. If the optimal values had been x 1   �  12 and x 2   �  2, substitution would result in the

Binding constraint  A con- straint that forms the optimal corner point of the feasible solution space.

Surplus  When the values of decision variables are substituted into a �   constraint, the amount by which the resulting value exceeds the right-hand-side value.

Slack  When the values of decision variables are substituted into a ≤  constraint, the amount by which the resulting value is less than the right-hand-side value.

FIGURE 19.13 The constraints define the feasible solution space

2 4 6 8 10 12 x1 0

2

4

6

8

x2

14

10

12

Feasible solution space

5 + 2 = 20 x 2

x 1

4 + 3 = 24

x 2

= 2x2

x 1

FIGURE 19.14 The optimum is the last point the objective function touches as it is moved toward the origin

2 4 6 8 10 12 x1 0

2

4

6

8

x2

14

10

12

8 + 12 = $96

x 2

x 1

Optimum

Objective function

ste24102_ch19_822-853.indd 837ste24102_ch19_822-853.indd 837 11/29/13 12:09 AM11/29/13 12:09 AM

Final PDF to printer

838 Chapter Nineteen Linear Programming

left-hand side being equal to 50. Hence, the constraint would be a binding constraint, and there would be no surplus (i.e., surplus would be zero).

19.4 THE SIMPLEX METHOD The simplex method is a general-purpose linear programming algorithm widely used to solve large-scale problems. Although it lacks the intuitive appeal of the graphical approach, its abil- ity to handle problems with more than two decision variables makes it extremely valuable for solving problems often encountered in operations management.

Although manual solution of linear programming problems using simplex can yield a number of insights into how solutions are derived, space limitations preclude describing it here. However, it is available on the Web site that accompanies this book. The discussion here will focus on computer solutions.

19.5 COMPUTER SOLUTIONS The microcomputer problem will be used to illustrate computer solutions. We repeat it here for ease of reference.

Maximize 60 50 where the number of type 1 computers the number of type 2 computers

1 2 1

2

x x x x

� � �

Subject to

Assembly 4 10 100 hours

Inspection 2 1 22 hours

Storage 3 3 39 cubic feet

, 0

1 2

1 2

1 2

1 2

x x

x x

x x

x x

� �

� �

� �

Solving LP Models Using MS Excel Solutions to linear programming models can be obtained from spreadsheet software such as Microsoft’s Excel. Excel has a routine called Solver that performs the necessary calculations.

To use Solver: 1. First, enter the problem in a worksheet, as shown in Figure 19.15 . What is not obvious

from the figure is the need to enter a formula for each cell where there is a zero (Solver auto- matically inserts the zero after you input the formula). The formulas are for the value of the objective function and the constraints, in the appropriate cells. Before you enter the formulas, designate the cells where you want the optimal values of x 1 and x 2 . Here, cells D4 and E4 are used. To enter a formula, click on the cell that the formula will pertain to, and then enter the formula, starting with an equal sign. We want the optimal value of the objective function to appear in cell G4. For G4, enter the formula

�60*D4 � 50*E4

The constraint formulas, using cells C7, C8, and C9, are

for C7:   � 4*D4 � 10*E4

for C8:   � 2*D4 � 1*E4

for C9:   � 3*D4 � 3*E4

2. Now, to access Solver in Excel 2010 or 2007, click D ata at the top of the worksheet, and in that ribbon, click on S olver in the Analysis group. In Excel 2010 the Solver menu will appear as illustrated in Figure 19.16 . If it does not appear there, it must be enabled using the Add-ins menu. Begin by setting the Objective (i.e., indicating the cell where you want the optimal value of the objective function to appear). Note, if the activated cell is the cell designated for the value of Z when you click on S olver, Solver will automatically set that cell as the Objective.

Simplex  A linear programming algorithm that can solve prob- lems having more than two deci- sion variables.

LO19.4 Interpret computer solutions of linear program- ming problems.

SCREEN C AM TUTORIAL

ste24102_ch19_822-853.indd 838ste24102_ch19_822-853.indd 838 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

Chapter Nineteen Linear Programming 839

Select the M ax radio button if it isn’t already selected. The Changing Variable Cells are the cells where you want the optimal values of the decision variables to appear. Here, they are cells D4 and E4. We indicate this by the range D4:E4 (Solver will add the $ signs).

Finally, add the constraints by clicking on A dd . . . When that menu appears, for each constraint, enter the cell that contains the formula for the left-hand side of the constraint, then select the appropriate inequality sign, and then enter the right-hand-side amount of the cell that has the right-hand-side amount. Here the right-hand-side amounts are used. After you have entered each constraint, either click on A dd to add another constraint or click on OK to return to the Solver menu. ( Note: Constraints can be entered in any order, and if cells are used for the right-hand side, then constraints with the same inequality could be grouped.) For the nonnegativity constraints simply check the checkbox to Make Unconstrained Variables Non-Negative. Also select Simplex LP as the Solving Method. Click on Solve.

FIGURE 19.15 MS Excel worksheet for microcomputer problem

FIGURE 19.16 MS Excel Solver parameters for microcomputer problem

ste24102_ch19_822-853.indd 839ste24102_ch19_822-853.indd 839 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

840 Chapter Nineteen Linear Programming

3. The Solver Results menu will then appear, indicating that a solution has been found, or that an error has occurred. If there has been an error, go back to the Solver Parameters menu and check to see that your constraints refer to the correct changing cells, and that the inequal- ity directions are correct. Make the corrections and click on S olve.

Assuming everything is correct, in the Solver Results menu, in the Reports box, highlight both Answer and Sensitivity, and then click OK.

4. Solver will incorporate the optimal values of the decision variables and the objec- tive function in your original layout on your worksheet (see Figure 19.17 ). We can see that the optimal values are type 1  �   9 units and type 2  �   4 units, and the total profit is 740. The answer report will also show the optimal values of the decision variables (middle part of Figure 19.18 ), and some information on the constraints (lower part of Figure 19.18 ). Of particular interest here is the indication of which constraints have slack and how much slack.

FIGURE 19.17 MS Excel worksheet solution for microcomputer problem

FIGURE 19.18 MS Excel Answer Report for microcomputer problem

ste24102_ch19_822-853.indd 840ste24102_ch19_822-853.indd 840 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

Chapter Nineteen Linear Programming 841

We can see that the constraint entered in cell C7 (assembly) has a slack of 24, and that the constraints entered in cells C8 (inspection) and C9 (storage) have slack equal to zero, indicat- ing that they are binding constraints.

19.6 SENSITIVITY ANALYSIS Sensitivity analysis is a means of assessing the impact of potential changes to the param- eters (the numerical values) of an LP model. Such changes may occur due to forces beyond a manager’s control, or a manager may be contemplating making the changes, say, to increase profits or reduce costs.

There are three types of potential changes:

1. Objective function coefficients.

2. Right-hand values of constraints.

3. Constraint coefficients.

We will consider the first two of these here. We begin with changes to objective function coefficients.

Objective Function Coefficient Changes A change in the value of an objective function coefficient can cause a change in the optimal solution of a problem. In a graphical solution, this would mean a change to another corner point of the feasible solution space. However, not every change in the value of an objective function coefficient will lead to a changed solution; generally there is a range of values for which the optimal values of the decision variables will not change. For example, in the microcomputer problem, if the profit on type 1 computers increased from $60 per unit to, say, $65 per unit, the optimal solution would still be to produce nine units of type 1 and four units of type 2 computers. Similarly, if the profit per unit on type 1 computers decreased from $60 to, say, $58, producing nine of type 1 and four of type 2 would still be optimal. These sorts of changes are not uncommon; they may be the result of such things as price changes in raw materials, price discounts, cost reductions in production, and so on. Obvi- ously, when a change does occur in the value of an objective function coefficient, it can be helpful for a manager to know if that change will affect the optimal values of the decision variables. The manager can quickly determine this by referring to that coefficient’s range of optimality , which is the range in possible values of that objective function coefficient over which the optimal values of the decision variables will not change. Before we see how to determine the range, consider the implication of the range. The range of optimality for the type 1 coefficient in the microcomputer problem is 50 to 100. That means that as long as the coefficient’s value is in that range, the optimal values will be nine units of type 1 and four units of type 2. Conversely, if a change extends beyond the range of optimality, the solution will change.

Similarly, suppose instead that the coefficient (unit profit) of type 2 computers was to change. Its range of optimality is 30 to 60. As long as the change doesn’t take it outside of this range, nine and four will still be the optimal values. Note, however, even for changes that are within the range of optimality, the optimal value of the objective function will change. If the type 1 coefficient increased from $60 to $61, and nine units of type 1 is still optimum, profit would increase by $9: nine units times $1 per unit. Thus, for a change that is within the range of optimality, a revised value of the objective function must be determined.

Now let’s see how we can determine the range of optimality using computer output.

Using MS Excel. There is a table for the Changing Cells (see Figure  19.19 ). It shows the value of the objective function that was used in the problem for each type of computer (i.e., 60 and 50), and the allowable increase and allowable decrease for each coefficient. By subtracting the allowable decrease from the original value of the coefficient, and adding the

Sensitivity analysis  Assessing the impact of potential changes to the numerical values of an LP model.

Range of optimality  Range of values over which the solu- tion quantities of all the decision variables remain the same.

LO19.5 Do sensitivity analysis on the solution to a linear programming problem.

SCREEN C AM TUTORIAL

ste24102_ch19_822-853.indd 841ste24102_ch19_822-853.indd 841 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

842 Chapter Nineteen Linear Programming

allowable increase to the original value of the coefficient, we obtain the range of optimality for each coefficient. Thus, we find for type 1:

60 10 50 and 60 40 100� � � �

Hence, the range for the type 1 coefficient is 50 to 100. For type 2:

50 20 30 and 50 10 60� � � �

Hence the range for the type 2 coefficient is 30 to 60. In this example, both of the decision variables are basic (i.e., nonzero). However, in other

problems, one or more decision variables may be nonbasic (i.e., have an optimal value of zero). In such instances, unless the value of that variable’s objective function coefficient increases by more than its reduced cost, it won’t come into solution (i.e., become a basic variable). Hence, the range of optimality (sometimes referred to as the range of insignifi- cance ) for a nonbasic variable is from negative infinity to the sum of its current value and its reduced cost.

Now let’s see how we can handle multiple changes to objective function coefficients, that is, a change in more than one coefficient. To do this, divide each coefficient’s change by the allowable change in the same direction. Thus, if the change is a decrease, divide that amount by the allowable decrease. Treat all resulting fractions as positive. Sum the fractions. If the sum does not exceed 1.00, then multiple changes are within the range of optimality and will not result in any change to the optimal values of the decision variables.

Changes in the Right-Hand-Side (RHS) Value of a Constraint In considering right-hand-side (RHS) changes, it is important to know if a particular constraint is binding on a solution. A constraint is binding if substituting the values of the decision vari- ables of that solution into the left-hand side of the constraint results in a value that is equal to the RHS value. In other words, that constraint stops the objective function from achieving a better value (e.g., a greater profit or a lower cost). Each constraint has a corresponding shadow price , which is a marginal value that indicates the amount by which the value of the objective function would change if there were a one-unit change in the RHS value of that constraint. If a constraint is nonbinding, its shadow price is zero, meaning that increasing

Shadow price  Amount by which the value of the objec- tive function would change with a one-unit change in the RHS value of a constraint.

FIGURE 19.19 MS Excel sensitivity report for microcomputer problem

ste24102_ch19_822-853.indd 842ste24102_ch19_822-853.indd 842 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

Chapter Nineteen Linear Programming 843

or decreasing its RHS value by one unit will have no impact on the value of the objective function. Nonbinding constraints have either slack (if the constraint is �) or surplus (if the constraint is �  ). Suppose a constraint has 10 units of slack in the optimal solution, which means 10 units that are unused. If we were to increase or decrease the constraint’s RHS value by one unit, the only effect would be to increase or decrease its slack by one unit. But there is no profit associated with slack, so the value of the objective function wouldn’t change. On the other hand, if the change is to the RHS value of a binding constraint, then the optimal value of the objective function would change. Any change in a binding constraint will cause the optimal values of the decision variables to change, and hence, cause the value of the objective function to change. For example, in the microcomputer problem, the inspection constraint is a binding constraint; it has a shadow price of 10. That means if there was one hour less of inspection time, total profit would decrease by $10, or if there was one more hour of inspection time available, total profit would increase by $10. In general, multiplying the amount of change in the RHS value of a constraint by the constraint’s shadow price will indi- cate the change’s impact on the optimal value of the objective function. However, this is only true over a limited range called the range of feasibility . In this range, the value of the shadow price remains constant. Hence, as long as a change in the RHS value of a constraint is within its range of feasibility, the shadow price will remain the same, and one can readily determine the impact on the objective function.

Let’s see how to determine the range of feasibility from computer output.

Using MS Excel. In the sensitivity report there is a table labeled “Constraints” (see Figure 19.19 ). The table shows the shadow price for each constraint, its RHS value, and the allowable increase and allowable decrease. Adding the allowable increase to the RHS value and subtracting the allowable decrease will produce the range of feasibility for that constraint. For example, for the inspection constraint, the range would be

22 4 26; 22 4 18� � � �

Hence, the range of feasibility for inspection is 18 to 26 hours. Similarly, for the storage con- straint, the range is

39 6 33 to 39 4.5 43.5� � � �

The range for the assembly constraint is a little different; the assembly constraint is non- binding (note the shadow price of 0) while the other two are binding (note their nonzero shadow prices). The assembly constraint has a slack of 24 (the difference between its RHS value of 100 and its final value of 76). With its slack of 24, its RHS value could be decreased by as much as 24 (to 76) before it would become binding. Conversely, increasing its right- hand side will only produce more slack. Thus, no amount of increase in the RHS value will make it binding, so there is no upper limit on the allowable increase. Excel indicates this by the large value (1E  �  30) shown for the allowable increase. So its range of feasibility has a lower limit of 76 and no upper limit.

If there are changes to more than one constraint’s RHS value, analyze these in the same way as multiple changes to objective function coefficients. That is, if the change is an increase, divide that amount by that constraint’s allowable increase; if the change is a decrease, divide the decrease by the allowable decrease. Treat all resulting fractions as positives. Sum the frac- tions. As long as the sum does not exceed 1.00, the changes are within the range of feasibility for multiple changes, and the shadow prices won’t change.

Table 19.1 summarizes the impacts of changes that fall within either the range of optimal- ity or the range of feasibility.

Now let’s consider what happens if a change goes beyond a particular range. In a situation involving the range of optimality, a change in an objective function that is beyond the range of optimality will result in a new solution. Hence, it will be necessary to recompute the solu- tion. For a situation involving the range of feasibility, there are two cases to consider. The first case would be increasing the RHS value of a � constraint to beyond the upper limit of its

Range of feasibility  Range of values for the RHS of a con- straint over which the shadow price remains the same.

ste24102_ch19_822-853.indd 843ste24102_ch19_822-853.indd 843 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

SOLVED PROBLEMS

A small construction firm specializes in building and selling single-family homes. The firm offers two basic types of houses, model A and model B. Model A houses require 4,000 labor hours, 2 tons of stone, and 2,000 board feet of lumber. Model B houses require 10,000 labor hours, 3 tons of stone, and 2,000 board feet of lumber. Due to long lead times for ordering supplies and the scarcity of skilled and semiskilled workers in the area, the firm will be forced to rely on its present resources for the upcoming building season. It has 400,000 hours of labor, 150 tons of stone, and 200,000 board

Problem 1

844 Chapter Nineteen Linear Programming

range of feasibility. This would produce slack equal to the amount by which the upper limit is exceeded. Hence, if the upper limit is 200, and the increase is 220, the result is that the con- straint has a slack of 20. Similarly, for a �   constraint, going below its lower bound creates a surplus for that constraint. The second case for each of these would be exceeding the opposite limit (the lower bound for a �  constraint, or the upper bound for a �   constraint). In either instance, a new solution would have to be generated.

Changes to objective function coefficients that are within the range of optimality

Component Result

Values of decision variables No change Value of objective function Will change

Changes to RHS values of constraints that are within the range of feasibility

Component Result

Value of shadow price No change List of basic variables No change Values of basic variables Will change Value of objective function Will change

TABLE 19.1 Summary of the impact of changes within their respective ranges

Linear programming is a powerful tool used for constrained optimization situations. Components of LP problems include an objective function, decision variables, constraints, and numerical values (parameters) of the objective function and constraints.

The size of real-life problems and the burden of manual solution make computer solutions the practi- cal way to solve real-life problems. Even so, much insight can be gained through the study of simple, two-variable problems and graphical solutions.

SUMMARY

1. Optimizing techniques such as linear programming help business organizations make the best use of limited resources such as materials, time, and energy, to maximize profits or to minimize costs.

2. As with all techniques, it is important to confirm that the underlying assumptions on which the technique is based are reasonably satisfied by the model in order to achieve valid results.

3. Although the graphical technique has limited use due to the fact that it can only handle two-vari- able problems, it is very useful in conveying many of the important concepts associated with linear programming techniques.

KEY POINTS

binding constraint, 837 constraints, 824 decision variables, 824 enumeration approach, 835 feasible solution space, 824

graphical linear programming, 826 objective function, 824 parameters, 824 range of feasibility, 843 range of optimality, 841

redundant constraint, 834 sensitivity analysis, 841 shadow price, 842 simplex, 838 slack, 837 surplus, 837

KEY TERMS

ste24102_ch19_822-853.indd 844ste24102_ch19_822-853.indd 844 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

Chapter Nineteen Linear Programming 845

feet of lumber. What mix of model A and B houses should the firm construct if model A yields a profit of $3,000 per unit and model B yields $6,000 per unit? Assume that the firm will be able to sell all the units it builds.

1. Formulate the objective function and constraints: 1

Maximize 3,000 6,000Z A B� �

Subject to

Labor Stone Lumber

4,000 2

2,000

10,000 3

2,000 ,

400,000 labor hours 150 tons 200,000 board feet 0

A A A

B B B

A B

� � �

� � � �

2. Graph the constraints and objective function, and identify the optimum corner point (see graph). Note that the lumber constraint is redundant: It does not form a boundary of the feasible solu- tion space.

Solution

1 For the sake of consistency, we will assign to the horizontal axis the first decision variable mentioned in the problem. In this case, variable A will be represented on the horizontal axis and variable B on the vertical axis.

20 40 60 80 100 120 0

20

40

60

80

100

120

Number of units of model A

N u

m b

er o

f u

n it

s o

f m

o d

el B

Redundant

Lum ber

Optimum

Labor

Stone

3. Determine the optimal quantities of models A and B, and compute the resulting profit. Because the optimum point is at the intersection of the stone and labor constraints, solve those two equa- tions for their common point:

Labor 4,000 10,000 400,000

2,000 (Stone 2 3 150)

4,000 100,000

25

A B

A B

B

B

� �

� � � �

Substitute B   �  25 in one of the equations, and solve for A:

2 3(25) 150 37.5

3,000(37.5) 6,000(25) 262,500

A A

Z

� � �

� � �

4. We could have used the enumeration approach to find the optimal corner point. The corner points and the value of the objective function at each corner point are:

A   �  0,  B   �  40 (found by inspection); Z   �  3,000(0)  �  6,000(40)  �  240,000

A   �  37.5,  B   �  25 (found using simultaneous equations); Z   �  262,500 (see step 3)

A   �  75,  B   �  0 (found by inspection); Z   �  3,000(75)  �  6,000(0)  �  225,000

The best value of Z is 262,500 (because this is a maximization problem), so that indicates that the optimal corner point is A   �  37.5,  B   �  25.

ste24102_ch19_822-853.indd 845ste24102_ch19_822-853.indd 845 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

846 Chapter Nineteen Linear Programming

This LP model was solved by computer:

Maximize 15 20 141 2 3x x x� � where x 1   �  quantity of product 1 x 2   �  quantity of product 2 x 3   �  quantity of product 3

Subject to

Labor Material Machine

5 6 4 10 8 5 4 2 5

, ,

210 hours 200 pounds

170 minutes 0

1 2 3

1 2 3

1 2 3

1 2 3

x x x

x x x

x x x x x x

� �

� �

� �

� � � �

The following information was obtained from the output. The ranges were also computed based on the output, and they are shown as well.

Problem 2

TOTAL PROFIT  �  548.00 Variable Value Reduced Cost Range of Optimality Product 1 0 10.6 unlimited to 25.60

Product 2 5 0 9.40 to 22.40 Product 3 32 0 12.50 to 50.00 Constraint Slack Shadow Price Range of Feasibility Labor 52 0.0 158.00 to unlimited Material 0 2.4 170.00 to 270.91 Machine 0 0.4 50.00 to 200.00

a. Which decision variables are basic (i.e., in solution)?

b. By how much would the profit per unit of product 1 have to increase in order for it to have a non- zero value (i.e., for it to become a basic variable)?

c. If the profit per unit of product 2 increased by $2 to $22, would the optimal production quantities of products 2 and 3 change? Would the optimal value of the objective function change?

d. If the available amount of labor decreased by 12 hours, would that cause a change in the optimal val- ues of the decision variables or the optimal value of the objective function? Would anything change?

e. If the available amount of material increased by 10 pounds to 210 pounds, how would that affect the optimal value of the objective function?

f. If profit per unit on product 2 increased by $1 and profit per unit on product 3 decreased by $.50, would that fall within the range of multiple changes? Would the values of the decision variables change? What would be the revised value of the objective function?

a. Products 2 and 3 are in solution (i.e., have nonzero values); the optimal value of product 2 is 5 units, and the optimal value of product 3 is 32 units.

b. The amount of increase would have to equal its reduced cost of $10.60.

c. No, because the change would be within its range of optimality, which has an upper limit of $22.40. The objective function value would increase by an amount equal to the quantity of prod- uct 2 and its increased unit profit. Hence, it would increase by 5($2)  �  $10 to $558.

d. Labor has a slack of 52 hours. Consequently, the only effect would be to decrease the slack to 40 hours.

e. The change is within the range of feasibility. The objective function value will increase by the amount of change multiplied by material’s shadow price of $2.40. Hence, the objective function value would increase by 10($2.40)  �  $24.00. ( Note: If the change had been a decrease of 10 pounds, which is also within the range of feasibility, the value of the objective function would have decreased by this amount.)

f. To determine if the changes are within the range for multiple changes, we first compute the ratio of the amount of each change to the end of the range in the same direction. For product 2, it is $1/$2.40  �  .417; for product 3, it is � $.50/  �  $1.50  �  .333. Next, we compute the sum of these ratios: .417  �  .333  �  .750. Because this does not exceed 1.00, we conclude that these changes are within the range. This means that the optimal values of the decision variables will not change. We can compute the change to the value of the objective function by multiplying each product’s optimal quantity by its changed profit per unit: 5($1)  �  32( � $.50)  �   � $11. Hence, with these changes, the value of the objective function would decrease by $11; its new value would be $548  �  $11  �  $537.

Solution

ste24102_ch19_822-853.indd 846ste24102_ch19_822-853.indd 846 11/22/13 1:58 PM11/22/13 1:58 PM

Final PDF to printer

Chapter Nineteen Linear Programming 847

1. For which decision environment is linear programming most suited?

2. What is meant by the term feasible solution space? What determines this region?

3. Explain the term redundant constraint.

4. What is an isocost line? An isoprofit line?

5. What does sliding an objective function line toward the origin represent? Away from the origin?

6. Briefly explain these terms: a. Basic variable. b. Shadow price. c. Range of feasibility. d. Range of optimality.

DISCUSSION AND REVIEW QUESTIONS

1. Solve these problems using graphical linear programming and answer the questions that follow. Use simultaneous equations to determine the optimal values of the decision variables. a. Maximize Z   �  4 x 1   �  3 x 2 Subject to

Material Labor

6 4 4 8

,

48 lb 80 hr 0

1 2

1 2

1 2

x x x x

x x

� � � �

b. Maximize Z   �  2 x 1   �  10 x 2 Subject to

Durability Strength Time

10 4 1 6 1 2

,

40 wk 24 psi 14 hr 0

1 2

1 2

1 2

1 2

x x x x x x

x x

� � � �

c. Maximize Z   �  6 A   �  3 B (revenue) Subject to

A

A

A

B B B

A B

Material Machinery Labor

20

25

20

6 20 30

,

600 lb 1,000 hr 1,200 hr 0

� � � �

(1) What are the optimal values of the decision variables and Z? (2) Do any constraints have (nonzero) slack? If yes, which one(s) and how much slack does each

have? (3) Do any constraints have (nonzero) surplus? If yes, which one(s) and how much surplus does

each have? (4) Are any constraints redundant? If yes, which one(s)? Explain briefly.

2. Solve these problems using graphical linear programming and then answer the questions that fol- low. Use simultaneous equations to determine the optimal values of the decision variables. a. Minimize Z   �  1.80 S   �  2.20 T

Subject to

Potassium Carbohydrate Protein

5 8

15 6

4 12

,

200 gr 240 gr 180 gr 10 gr 0

T

S T

S T

S T T

S T

� � � � �

b. Minimize Z   �  2 x 1   �  3 x 2

Subject to

D E F

4 2 2 6 1 2

,

20 18 12 0

1 2

1 2

1 2

1 2

x x x x x x

x x

� � � �

(1) What are the optimal values of the decision variables and Z? (2) Do any constraints have (nonzero) slack? If yes, which one(s) and how much slack does each have? (3) Do any constraints have (nonzero) surplus? If yes, which one(s) and how much surplus does

each have? (4) Are any constraints redundant? If yes, which one(s)? Explain briefly.

PROBLEMS

ste24102_ch19_822-853.indd 847ste24102_ch19_822-853.indd 847 11/29/13 1:12 AM11/29/13 1:12 AM

Final PDF to printer

848 Chapter Nineteen Linear Programming

3. An appliance manufacturer produces two models of microwave ovens: H and W. Both models require fabrication and assembly work; each H uses four hours of fabrication and two hours of assembly, and each W uses two hours of fabrication and six hours of assembly. There are 600 fabri- cation hours available this week and 480 hours of assembly. Each H contributes $40 to profits, and each W contributes $30 to profits. What quantities of H and W will maximize profits? a. Use the objective function approach. b. Use the enumeration approach.

4. A small candy shop is preparing for the holiday season. The owner must decide how many bags of deluxe mix and how many bags of standard mix of Peanut/Raisin Delite to put up. The deluxe mix has 2⁄3 pound raisins and 1⁄3 pound peanuts, and the standard mix has ½ pound raisins and ½ pound peanuts per bag. The shop has 90 pounds of raisins and 60 pounds of peanuts to work with.

Peanuts cost $.60 per pound and raisins cost $1.50 per pound. The deluxe mix will sell for $2.90 for a one-pound bag, and the standard mix will sell for $2.55 for a one-pound bag. The owner estimates that no more than 110 bags of one type can be sold.

a. If the goal is to maximize profits, how many bags of each type should be prepared? b. What is the expected profit?

5. A retired couple supplement their income by making fruit pies, which they sell to a local grocery store. During the month of September, they produce apple and grape pies. The apple pies are sold for $1.50 to the grocer, and the grape pies are sold for $1.20. The couple is able to sell all of the pies they produce owing to their high quality. They use fresh ingredients. Flour and sugar are pur- chased once each month. For the month of September, they have 1,200 cups of sugar and 2,100 cups of flour. Each apple pie requires 1½ cups of sugar and 3 cups of flour, and each grape pie requires 2 cups of sugar and 3 cups of flour. a. Determine the number of grape and the number of apple pies that will maximize revenues if the

couple working together can make an apple pie in six minutes and a grape pie in three minutes. They plan to work no more than 60 hours.

b. Determine the amounts of sugar, flour, and time that will be unused.

6. Solve each of these problems by computer and obtain the optimal values of the decision variables and the objective function. a. Maximize 4 x 1   �  2 x 2   �  5 x 3 Subject to

1 2 1

1 4 2

3 3  1

, ,

25

40

30

0

1 2 3

1 2 3

1 2 3

1 2 3

x x x

x x x

x x x

x x x

� �

� �

� �

b. Maximize 10 x 1   �  6 x 2   �  3 x 3 Subject to

1 1 2 2 1 4 1 2 3

, ,

25 40 40 0

1 2 3

1 2 3

1 2 3

1 2 3

x x x x x x x x x

x x x

� � � � � �

� � � �

7. For Problem 6 a, determine the following: a. The range of feasibility for each constraint. b. The range of optimality for the coefficients of the objective function.

8. For Problem 6 b: a. Find the range of feasibility for each constraint, and interpret your answers. b. Determine the range of optimality for each coefficient of the objective function. Interpret your

results.

9. A small firm makes three similar products, which all follow the same three-step process, consisting of milling, inspection, and drilling. Product A requires 12 minutes of milling, 5 minutes for inspection, and 10 minutes of drilling per unit; product B requires 10 minutes of milling, 4 minutes for inspec- tion, and 8 minutes of drilling per unit; and product C requires 8 minutes of milling, 4 minutes for inspection, and 16 minutes of drilling. The department has 20 hours available during the next period for milling, 15 hours for inspection, and 24 hours for drilling. Product A contributes $2.40 per unit to profit, product B contributes $2.50 per unit, and product C contributes $3.00 per unit. Determine the

ste24102_ch19_822-853.indd 848ste24102_ch19_822-853.indd 848 11/23/13 10:05 AM11/23/13 10:05 AM

Final PDF to printer

Chapter Nineteen Linear Programming 849

Product Retail Price per Quart

Orange juice $1.00

Grapefruit juice .90

Pineapple juice .80

All-in-One 1.10

TIME PER UNIT (MINUTES)

Item Profit/Unit Cutting Gluing Finishing

Chopping board $2 1.4 5 12

Knife holder $6 0.8 13 3

contributes $300 per unit. Determine the optimal mix of products in terms of maximizing contribution to profits for the period. Then, find the range of optimality for the profit coefficient of each variable.

10. Formulate and then solve a linear programming model of this problem, to determine how many containers of each product to produce tomorrow to maximize profits. The company makes four juice products using orange, grapefruit, and pineapple juice.

The All-in-One juice has equal parts of orange, grapefruit, and pineapple juice. Each product is produced in a one-quart size (there are four quarts in a gallon). On hand are 400 gallons of orange juice, 300 gallons of grapefruit juice, and 200 gallons of pineapple juice. The cost per gallon is $2.00 for orange juice, $1.60 for grapefruit juice, and $1.40 for pineapple juice.

In addition, the manager wants grapefruit juice to be used for no more than 30 percent of the number of containers produced. She wants the ratio of the number of containers of orange juice to the number of containers of pineapple juice to be at least 7 to 5.

11. A wood products firm uses available time at the end of each week to make goods for stock. Currently, two products on the list of items are produced for stock: a chopping board and a knife holder. Both items require three operations: cutting, gluing, and finishing. The manager of the firm has collected the following data on these products:

The manager has also determined that, during each week, 56 minutes are available for cutting, 650 minutes are available for gluing, and 360 minutes are available for finishing. a. Determine the optimal quantities of the decision variables if the goal is to maximize profit. b. Which resources are not completely used by your solution? How much of each resource is

unused?

12. The manager of the deli section of a grocery superstore has just learned that the department has 112 pounds of mayonnaise, of which 70 pounds is approaching its expiration date and must be used. To use up the mayonnaise, the manager has decided to prepare two items: a ham spread and a deli spread. Each pan of the ham spread will require 1.4 pounds of mayonnaise, and each pan of the deli spread will require 1.0 pound. The manager has received an order for 10 pans of ham spread and 8 pans of the deli spread. In addition, the manager has decided to have at least 10 pans of each spread available for sale. Both spreads will cost $3 per pan to make, but ham spread sells for $5 per pan and deli spread sells for $7 per pan. a. Determine the solution that will minimize cost. b. Determine the solution that will maximize profit.

13. A manager wants to know how many units of each product to produce on a daily basis in order to achieve the highest contribution to profit. Production requirements for the products are shown in the following table.

Product Material 1 (pounds)

Material 2 (pounds)

Labor (hours)

A 2 3 3.2 B 1 5 1.5 C 6 — 2.0

Material 1 costs $5 a pound, material 2 costs $4 a pound, and labor costs $10 an hour. Product A sells for $80 a unit, product B sells for $90 a unit, and product C sells for $70 a unit. Available resources each day are 200 pounds of material 1; 300 pounds of material 2; and 150 hours of labor.

ste24102_ch19_822-853.indd 849ste24102_ch19_822-853.indd 849 11/23/13 10:05 AM11/23/13 10:05 AM

Final PDF to printer

850 Chapter Nineteen Linear Programming

The manager must satisfy certain output requirements: The output of product A should not be more than one-third of the total number of units produced; the ratio of units of product A to units of product B should be 3 to 2; and there is a standing order for 5 units of product A each day. For- mulate a linear programming model for this problem, and then solve.

14. A chocolate maker has contracted to operate a small candy counter in a fashionable store. To start with, the selection of offerings will be intentionally limited. The counter will offer a regular mix of candy made up of equal parts of cashews, raisins, caramels, and chocolates, and a deluxe mix that is one-half cashews and one-half chocolates, which will be sold in one-pound boxes. In addition, the candy counter will offer individual one-pound boxes of cashews, raisins, caramels, and chocolates.

A major attraction of the candy counter is that all candies are made fresh at the counter. How- ever, storage space for supplies and ingredients is limited. Bins are available that can hold the amounts shown in the table:

Ingredient Capacity

(pounds per day)

Cashews 120 Raisins 200 Caramels 100 Chocolates 160

In order to present a good image and to encourage purchases, the counter will make at least 20 boxes of each type of product each day. Any leftover boxes at the end of the day will be removed and given to a nearby nursing home for goodwill. The profit per box for the various items has been determined as follows:

Item Profit per Box

Regular $.80 Deluxe .90 Cashews .70 Raisins .60 Caramels .50 Chocolates .75

a. Formulate the LP model. b. Solve for the optimal values of the decision variables and the maximum profit.

15. Given this linear programming model, solve the model and then answer the questions that follow.

Maximize 12 x 1   �  18 x 2   �  15 x 3 where x 1   �  the quantity of product 1 to make, etc.

Subject to

Machine 5 4 3 160 minutes Labor 4 10 4 288 hours Materials 2 2 4 200 pounds Product 2 16 units

, , 0

1 2 3

1 2 3

1 2 3

2

1 2 3

x x x x x x x x x

x x x x

+ + +

� � � � � �

� �

a. Are any constraints binding? If so, which one(s)? b. If the profit on product 3 were changed to $22 a unit, what would the values of the decision

variables be? The objective function? Explain. c. If the profit on product 1 were changed to $22 a unit, what would the values of the decision

variables be? The objective function? Explain. d. If 10 hours less of labor time were available, what would the values of the decision variables

be? The objective function? Explain. e. If the manager decided that as many as 20 units of product 2 could be produced (instead of 16),

how much additional profit would be generated? f. If profit per unit on each product increased by $1, would the optimal values of the decision

variables change? Explain. What would the optimal value of the objective function be?

ste24102_ch19_822-853.indd 850ste24102_ch19_822-853.indd 850 11/23/13 10:05 AM11/23/13 10:05 AM

Final PDF to printer

Chapter Nineteen Linear Programming 851

16. A garden store prepares various grades of pine bark for mulch: nuggets ( x 1 ), mini-nuggets ( x 2 ), and chips ( x 3 ). The process requires pine bark, machine time, labor time, and storage space. The following model has been developed.

Maximize 9 x 1   �  9 x 2   �  6 x 3 (profit)

Subject to

Bark 5 6 3 600 pounds Machine 2 4 5 600 minutes Labor 2 4 3 480 hours Storage 1 1 1 150 bags

, , 0

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

x x x x x x x x x x x x

x x x

+ + +

� � � � � � � � �

a. What is the marginal value of a pound of pine bark? Over what range is this price value appropriate? b. What is the maximum price the store would be justified in paying for additional pine bark? c. What is the marginal value of labor? Over what range is this value in effect? d. The manager obtained additional machine time through better scheduling. How much addi-

tional machine time can be effectively used for this operation? Why? e. If the manager can obtain either additional pine bark or additional storage space, which one

should she choose and how much (assuming additional quantities cost the same as usual)? f. If a change in the chip operation increased the profit on chips from $6 per bag to $7 per bag,

would the optimal quantities change? Would the value of the objective function change? If so, what would the new value(s) be?

g. If profits on chips increased to $7 per bag and profits on nuggets decreased by $.60, would the optimal quantities change? Would the value of the objective function change? If so, what would the new value(s) be?

h. If the amount of pine bark available decreased by 15 pounds, machine time decreased by 27 minutes, and storage capacity increased by five bags, would this fall in the range of feasibil- ity for multiple changes? If so, what would the value of the objective function be?

Son, Ltd. CASE

Son, Ltd., manufactures a variety of chemical products used by photo- processors. Son was recently bought out by a conglomerate, and man- agers of the two organizations have been working together to improve the efficiency of Son’s operations.

Managers have been asked to adhere to weekly operating budgets and to develop operating plans using quantitative methods whenever possible. The manager of one department has been given a weekly operating budget of $11,980 for production of three chemical products, which for convenience shall be referred to as Q, R, and W. The budget is intended to pay for direct labor and materials. Processing requirements for the three products, on a per-unit basis, are shown in the table.

The company has a contractual obligation for 85 units of product R  per week.

Material A costs $4 per pound, as does material B. Labor costs $8  an hour.

Product Q sells for $122 a unit, product R sells for $115 a unit, and product W sells for $76 a unit.

The manager is considering a number of different proposals regard- ing the quantity of each product to produce. The manager is primarily interested in maximizing contribution. Moreover, the manager wants to

know how much labor will be needed, as well as the amount of each material to purchase.

Questions Prepare a report that addresses the following issues:

1. The optimal quantities of products and the necessary quantities of labor and materials.

2. One proposal is to make equal amounts of the products. What amount of each will maximize contribution, and what quantities of labor and materials will be needed? How much less will total contri- bution be if this proposal is adopted?

3. How would you formulate the constraint for material A if it was determined that there is a 5 percent waste factor for material A and equal quantities of each product are required?

Product Labor

(hours) Material A (pounds)

Material B (pounds)

Q 5 2 1

R 4 2 —

W 2 ½ 2

ste24102_ch19_822-853.indd 851ste24102_ch19_822-853.indd 851 11/22/13 1:59 PM11/22/13 1:59 PM

Final PDF to printer

852 Chapter Nineteen Linear Programming

Custom Cabinets, Inc. (CCI), manufactures two major lines of kitchen and bathroom cabinets. The SemiCustom Line consists of cabinets that are variations on a standard design. These cabinets are made to order. The StandardLine is a lower-priced line of cabinets that use standard- ized designs and materials. StandardLine cabinets are made to stock. The company has been in business for many years and has consistently performed well financially.

It was obvious that something big was up as the management staff began to gather for a meeting called by CCI General Manager John Flem- ing. There was little of the usual light banter, and more significantly, there were no coffee and donuts. The CCI culture celebrates even small achieve- ments with coffee and donuts. Their absence was not a good omen.

John began rather somberly. “As you know we are almost two months into our second fiscal quarter. Frankly, the financial results don’t look very good. You are aware, I’m sure, of how the stock market has been punishing companies that fail to at least meet their sales and profit targets. We are in danger of having to announce that we met our sales goals but fell short of our profit goals. This will be a real jolt to our shareholders, and since, except for the interns, we are all in the company’s stock purchase plan, that means it will hurt us, too. We only have one month to turn this around. We don’t want to take any shortcut approaches to meeting our goals—we want the results to reflect the real results of our operation.

The headquarters brass talked with a consultant who analyzed our records. Her opinion is that we need to address operations effi- ciency. In her words, we have to learn to get more out of our existing resources. She leaves the details to us to figure out. Our biggest per- sonnel resource to assign to this problem is our group of management interns from Nearby University. I’ve talked to the interns and alerted them that for the next month or so they are to work directly with Bill Chavez, our Operations Manager, on this project. The goal is to be sure that we get the maximum bang for our resource buck during the next month’s operations. We have to get the most profit possible to make the quarter’s results look at least respectable. Needless to say, I want each of you to give the intern group your fullest cooperation.”

Now you understand why the interns were invited to the staff meet- ing. You’ve just been on board for a few weeks and have just begun to understand the company’s operations. That means the boss can’t be looking to you for engineering solutions. Your expertise is operations management, not engineering.

As the meeting broke up, Bill Chavez asked you (the interns) to stay for a follow-up meeting with him. “I’ve been very impressed with the work that you have done in your short time with CCI. You obviously get an excellent education at Nearby U. I asked Tom to assign you to me because I think you are our best hope of pulling out some really good

profit numbers. You don’t have any preconceived ideas about what will and will not work, so I expect you to come up with ideas that are more innovative than the old hands.

“I spent most of the morning with the other department heads gathering information that I think you might need (that information is enclosed with this case). If you need additional information send me an e-mail or stop in my office. If I can get the information you need, I will do so. We’re counting on you. Don’t let us down. I’ll let you guys figure out when and where to meet. Needless to say you have full access to all our computer resources should you need them.

“There are a few things you need to keep in mind. Our SemiCustom Line is hot because of our excellent customer service. We never fail to deliver a SemiCustom unit on time. We also need to meet our customer orders on the StandardLine units, but we can cut the stockage levels if necessary. We can’t, however, exceed the stockage levels. Making excess inventory is no way to be more efficient. If necessary, we could work 10 percent overtime in assembly and 5 percent overtime in fin- ishing. Each overtime hour will add $5.00 per hour to our labor cost. I’ve checked with all our suppliers. We can get up to 50,000 additional board-feet of wood by paying a $0.50 per board-foot upcharge and 10,000 additional square feet of laminate for an upcharge of $0.15 per square foot. There is no reasonable prospect of obtaining more of the other materials at any price. Because of the way our profit center is set up, we get credit for building to the authorized stockage level as if it were a final sale.”

As you were leaving the meeting, Barbara Wilson invited you to the break room for a cup of coffee. Barbara is the Lead Production Scheduler and has worked for Custom Cabinets for a long time. You have been told that she knows everything about how things work here and is a good person to know. “I heard about your assignment,” she began. “Let me tell you some things about your boss, Bill Chavez. He is a great guy to work for and he really knows his stuff. He is not one of the college guys who act as if they know everything—no offense. He worked his way up. He is very intelligent, but doesn’t have the educational background that you do. In the past, new college gradu- ates have made some mistakes in writing reports for Bill. He likes for everything in the report to be written in words he can understand. He likes you to include computer printouts in an appendix to the report (he likes to see all the backup detail), but wants you to explain in the body of the report why they are necessary and what they mean. If he doesn’t understand what you are recommending and why, he won’t ask questions. He will just discard the report, and that will be the last assignment you will ever do for him. I figured that the least I could do would be to buy you a cup of coffee and try to help you get off to a good start on this project.”

CASE Custom Cabinets, Inc. ©

(continued)

ste24102_ch19_822-853.indd 852ste24102_ch19_822-853.indd 852 11/22/13 1:59 PM11/22/13 1:59 PM

Final PDF to printer

Chapter Nineteen Linear Programming 853

Questions

1. Should there be additional overtime, and if so, how much? 2. Should additional laminate be purchased, and if so, how much? 3. Should additional wood be purchased, and if so, how much? 4. What is the maximum profit that can be achieved by purchasing

additional wood?

ENCLOSURE A BILLS OF MATERIALS AND LABOR

Wood bd.-ft.

Trim lin. ft.

Granite sq. ft.

Solid Surface sq. ft.

Laminate sq. ft.

Assbly. Labor hrs.

Finish Labor hrs.

SemiCustom Line

SC-A 125 27 175 0 0 37 7

SC-B 160 42 243 0 0 57 12

SC-C 140 35 0 160 0 30 5

SC-D 200 52 0 140 0 35 7

StandardLine

S-10 60 21 0 112 0 21 3

S-20 110 28 0 0 135 25 5

S-30 200 50 0 0 254 30 7

S-40 180 43 0 0 176 27 5

Available

400,000 140,000 45,000 150,000 400,000 100,000 25,000

ENCLOSURE B ORDERS AND PROFITS

Profit/Unit

@ Standard Customer Orders

Next Month

Build-to-Stock Authorization Next Month

SemiCustom Line

SC-A $325 117 0

SC-B $575 92 0

SC-C $257 130 0

SC-D $275 150 0

StandardLine

S-10 $175 475 400

S-20 $210 363 350

S-30 $260 510 450

S-40 $230 412 475

Source: © Victor E. Sower, 2006.

Anderson, David R., Dennis J. Sweeney, Thomas A. Williams, Jeffrey D. Camm, and Skip Martin. An Introduction to Management Science: Quantitative Approaches to Decision Making. Revised Thirteenth Edition. Mason, OH: South-Western, 2012.

Hillier, Frederick S., and Mark S. Hillier. Introduction to Management Science: A Modeling and Case Studies Approach with Spreadsheets, 5/e New York: McGraw-Hill, 2014.

Ragsdale, Cliff T. Spreadsheet Modeling and Decision Analysis. 6th ed. Mason, OH: South-Western, 2011.

Stevenson, W. J., and Ceyhun Ozgur. Introduction to Management Science with Spreadsheets. New York: McGraw-Hill, 2006.

Taylor, Bernard. Introduction to Management Science. 11th ed. Upper Saddle River, NJ: Pearson Prentice Hall, 2013.

SELECTED BIBLIOGRAPHY AND FURTHER

READINGS

ste24102_ch19_822-853.indd 853ste24102_ch19_822-853.indd 853 11/23/13 10:05 AM11/23/13 10:05 AM

Final PDF to printer

854

APPENDIX Answers to Selected Problems

Chapter 2: Competitiveness, Strategy, and Productivity

1. Anniversary  5  37.5 meals per worker.

Wedding  5  40 meals per worker.

2. Smaller crew sizes had the higher productivity.

3. Week 1: 3.03.

Week 2: 2.99.

Week 3: 2.89.

Week 4: 2.84.

4. a. Before: Labor productivity  5  16 carts per worker per hour.

After: Labor productivity  5  21 carts per worker per hour.

b. Before: Multifactor productivity  5  .89 cart per dollar.

After: Multifactor productivity  5  .93 cart per dollar.

5. 11.1%.

6. 4.44%.

8. Current: $5; A  5  $6.30; B  5  $6.71

Chapter 3: Forecasting

1. a. blueberry  5  33, cinnamon  5  35, cupcakes  5  47.

b. Demand did not exceed supply.

2. b. (1) 20, (2) 19, (3) 20.4, (4) 19.26, (5) 20.86.

3. a. 88.16 percent.

b. 88.54 percent.

4. a. 22. b. 20.75. c. 20.72.

5. a. Increasing by 15,000 bottles per year.

b. 170 (i.e., 170,000 bottles).

6. 500  2  20 t.

7. a. Ft   5  208.44  1  19.00 t. b. 588.44, 607.44. c. Week 31.13.

9. a. Ft   5  195.47  1  7.00 t. b. 307.22.

F 16   5  307.47  F 18   5  321.47

F 17   5  314.17  F 19   5  328.47

12. Q 1 : 127.6;  Q 2 : 143.5;  Q 3 : 105;  Q 4 : 273.65;  Q 1   5  275.

14. a. Fri.  5  0.756, Sat.  5  1.341, Sun.  5  0.874.

b. Fri.  5  0.756, Sat.  5  1.341, Sun.  5  0.874.

16. Day a. Relative b. Relative

1 . . . . . 0.901 0.887

2 . . . . . 0.838 0.831

3 . . . . . 0.884 0.876

4 . . . . . 1.020 1.022

5 . . . . . 1.430 1.438

6 . . . . . 1.480 1.483

7 . . . . . 0.450 0.464

18. b. Jan. . . . . . 800

Feb. . . . . . 810

Mar. . . . . . 900

Apr. . . . . . 810

22. a. MSE MAD b. MAPE 1   5  .36% MAPE 2   5  .46% Forecast 1 . . . . 10.44 2.8 Forecast 2 . . . . 42.44 3.6 Naive . . . . . . . . 156 10.7 23. b. $847,000.

24. b. $17.90.

25. b. 2 0.985.

26. b. Y   5  66.44  1  .58 x.

d. 90.22.

27. a. r   5   1 .96.

b. Y   5   2 0.672  1  6.158 x.

c. About 12 mowers.

28. a. MAD 5 5 5. MAD 6 5 5.9. MAD 7 5 4.73. MAD 8 5 3.911. MAD 9 5 4.238.

etc.

30. a. Initial MAD  5  4.727. The tracking signal for month 15 is 4.088, so at that point, the forecast would be suspect.

b. �  errors  5   2 1,  �  errors 2   5   345. Control limits: 0  6   12.38 (in limits). Plot reveals cycles in errors.

Chapter 4 Supplement: Reliability

1. a. .81. b. .9801. c. .9783.

2. .9033.

3. .9726.

4. .93.

5. a. .9315. b. .9953. c. .994.

6. a. .7876. b. 0.8664, Component 4. c. 0.8681, Component 4.

7. a. Plan 2 (.9934).

8. a. .0020. b. .0023.

9. .996.

10. .995.

11. .006.

12. a. (1) .2725. b. (1) .6671.

(2) .2019. (2) .3935.

(3) .1353. (3) .1813.

c. (1) 21 months. (3) 90 months.

(2) 57 months. (4) 138 months.

13. a. .6321. b. Three months or 90 days.

14. a. .3012. b. .1813. c. .5175.

15. a. .2231. b. .8647.

c. .0878. d. .0302.

16. a. .2266. b. .4400. c. .3830.

17. a. (1) .9772. b. Approximately zero.

(2) .5000.

(3) .0013.

18. a. 4.97 years. b. 5.18 years.

19. a. .93. b. .98.

b. TS 5 5 1.40. TS 6 5 2 0.17. TS 7 5 2 0.63. TS 8 5 2 0.26. TS 9 5 2 1.42.

etc.

A

ste24102_appA_854-866.indd 854ste24102_appA_854-866.indd 854 11/22/13 2:01 PM11/22/13 2:01 PM

Final PDF to printer

Appendix A Answers to Selected Problems 855

5. Subcontract: $1.23.

Expand: $1.57.

Build: $1.35.

6. a. Relocate.

b. Renew.

c. Relocate.

d. Relocate.

7. a. Renew.

b. EVPI  5  $1,575,000.

c. Yes.

9. a. Build large: $53.6 million.

b. Build small: $42 million.

c. $12.4.

d. Build small for P (high) , .721.

Build large for P (high) . .721.

10. Buy two ($113.5).

11. A: 49.

12. b. maximin: small.

maximax: large.

Laplace: large.

minimax regret: large.

13. a. New staff.

b. Redesign.

c. New staff.

d. New staff or redesign.

16. b. Alternative C. c. P (2) . .625.

d. P (1) , .375.

17. b. Alternative B.

c. P (2) , .444.

d. P (1) . .556.

Chapter 6: Process Selection and Facility Layout

1. a. Minimum is 2.4 minutes, maximum is 18 minutes.

b. 25 units to 187.5 units. c. Eight.

d. 3.6 minutes. e. (1) 50 units.

(2) 30 units.

2. a. Station Tasks Time

1 a 1.4 2 b, e 1.3 3 d, c, f 1.8 4 g, h 1.5

3. a. Station Tasks Time 1 f, a, g 14 2 d, b, c 13 3 e, h 13 4 i 5

4. a. (3) 11.54%. (4) 323 copiers per day.

b. (1) 2.3 minutes. (3) 182.6 copiers per day.

(4) 91.3 copiers units per day.

5. b. 2 minutes.

c. Three stations.

6. c. (1) 11.1%. (2) 11.1%.

7. b. CT  5  .84 min. or 50.4 sec.

c. n   5  3.83 (round to 4) stations.

Chapter 5: Strategic Capacity Planning for Products and Services

1. a. Utilization  5  70%.

Efficiency  5  87.5%.

b. Utilization  5  67%.

Efficiency  5  80%.

2. 20 jobs per week.

3. a. 46,000 units.

b. (1) $3,000. (2) $8,200.

c. 126,000 units. d. 25,556 units.

4. a. A: 8,000 units. b. 10,000 units.

B: 7,500 units.

c. A: $20,000.

B: $18,000.

5. a. 39,683 units. b. $1.71 (rounded up). 6. a. A: $82.

B: $92.

C: $100.

c. A: 0 to less than 178.

B: Never.

C: 178  1  .

d. 1/3 day, 2/3 evening.

7. Vendor best for Q  < 63,333. For larger quantities, produce in-house at $4 per unit.

8. a. Vendor B best for 10,000 and 20,000.

9. 3 cells.

11. a. Buy 2 Bs. b. Buy 2 Bs.

12. a. one: Q   5  80. two: Q   5  152.

14. a. 11 units/hr.

16. 50 units/hr.

17. a. 15 units/hr. b. 23 units/hr.

18. 8 years.

Chapter 5 Supplement: Decision Theory

1. a. Expand (80).

b. Do nothing (50).

c. Indifferent between do nothing and subcontract (55).

d. Subcontract (10).

2. a. Expand (62). c. $9 (000).

3. Do nothing: P (high) , .50.

Subcontract: .50 ,  P (high) , .67.

Expand: P (high) . .67.

4. a.

2

1

Bui ld s

ma ll

Build large

Dema nd lo

w (.4 )

Demand high (.6)

Dema nd lo

w (.4 )

Demand high (.6)

Main tain

Expand

$400,000 (1)

$ 50,000 (2)

$450,000 (3)

$–10,000 (4)

$800,000 (5) b. $164,000.

c. Large 0 to .46.

Small .46 to 1.00.

ste24102_appA_854-866.indd 855ste24102_appA_854-866.indd 855 11/22/13 2:01 PM11/22/13 2:01 PM

Final PDF to printer

856 Appendix A Answers to Selected Problems

13. a. 12%.

b. 163 observations.

15. 377 observations.

Chapter 7 Supplement: Learning Curves

1. a. 178.8 hours.

b. 1,121.4 hours.

c. 2,914.8 hours.

2. a. 41.47 hours.

b. 60.55 hours.

c. 72.20 hours.

3. a. 56.928 days.

b. 42.288 days.

c. 37.512 days.

5. a. P   5  85 percent.

b. 26.21 minutes.

6. 87.9 minutes.

7. 201.26 hours.

8. a. 11.35 hours.

b. 13.05 hours.

c. 13.12 hours.

9. a. $80.31.

b. 10 units.

10. B and C.

12. 30.82 hours.

13. No.

14. 18.76 hours.

15. Art: 20; Sherry: 4; Dave: 10.

16. 7 repetitions.

17. Beverly: 6; Max: 23; Antonio: 4.

19. 8.232 hours.

Chapter 8: Location Planning and Analysis

1. Kansas City: $256,000.

2. a. A: 16,854; B: 17,416; C: 17,753. b. C: $14,670.

3. a. 120 units. b. A: 0 to 119; B: 121 1  .

4. a. B: 0 to 33; C: 34 to 400; A: 401 1  .

5. C ($270,000).

6. Biloxi ($160,000).

7. a. (1) outside; (2) city. b. 230 cars. 9. A.

11. a. B  5  C > A.

b. B > C > A.

12. (5,4) is optimal.

13. (6,7).

14. (5.97, 5.95).

15. (3.24, 2.30).

Chapter 9: Management of Quality 2. Res. Com.

10 3Noisy

7 2Failed

5 7Odor

3 4Warm

10.

11.

13.

14. a. TC  5  $14,150.

16. A: 3; B: 5; C: 1; D: 4; E: 6; F: 2.

17. A:1; B:3; C:7; D:10; E:9; F:8; G:6; H:4; I:5; J:2.

Chapter 7: Work Design and Measurement

1. 15.08 minutes.

2. a. 1.2 minutes.

b. 1.14 minutes.

c. 1.27 minutes.

3. Element OT NT ST

1 . . . . . . . 0.46 0.414 0.476

2 . . . . . . . 1.505 1.280 1.472

3 . . . . . . . 0.83 0.913 1.050

4 . . . . . . . 1.16 1.160 1.334

4. Element Average

1 . . . . . . . . . 4.1 2 . . . . . . . . . 1.5

3 . . . . . . . . . 3.3

4 . . . . . . . . . 2.8

7. 5.85 minutes.

8. 7.125 minutes.

11. 57 observations.

12. 37 cycles.

OA

O

O

O

O

O

X

O

O

O

X

A

O

A

2

1

3

4

5

6

6 2

3 8 7

1 5 4

5 2

9 7 4

6

3 1 8

D #3

A #1

B #4

C #2

ste24102_appA_854-866.indd 856ste24102_appA_854-866.indd 856 11/22/13 2:01 PM11/22/13 2:01 PM

Final PDF to printer

Appendix A Answers to Selected Problems 857

19. Med: z   5   1 0.9177.

U/D: z   5   1 0.5561.

20. b. 4.5, .192.

c. 4.5, .086.

d. 4.242 to 4.758.

f. None.

21. a. 1.11. b. No.

22. Process 005 is capable.

24. C pk :  H   5  .94,  K   5  1.00,  T   5  1.33.

26. Melissa.

27. a. 2.506.

b. C pk   5  1.41.

c. .987 ounces.

Chapter 10 Supplement: Acceptance Sampling

1. a. (1) Yes. (2) Yes. b. .0067.

2. b. .0390.

3. c. .0024.

5. a. 0.16.

b. 2.

c. (1) Accept.

(2) .0362.

(3) .9638.

(4) p (Type I)  5  .0362.

p (Type II)  5  0.

Chapter 11: Aggregate Planning and Master Scheduling

1. b. $95,500.

2. $57,000.

3. $69,000.

4. $69,750.

7. a. $31,250.

b. $31,310.

8. a. $350,800.

b. $356,200.

c. $353,700.

10. B: $14,340.

C: $14,370.

11. $13,475.

12. $13,885.

13. $4,970.

15. $124,960.

16. $126,650; additional cost: $1,920.

Chapter 12: MRP and ERP

1. F  5  2, G  5  1, H  5  1, J  5  6, D  5  10, L  5  2, A  5  4.

2. a. E  5  138.

b. Week 5.

3. a. 360.

b. Day 1 (now).

Chapter 10: Quality Control 1. a. .0124.

b. 24.40 ounces and 24.60 ounces.

2. a. LCL: 0.996 liter. b. Not in control.

UCL: 1.004 liters.

3. a. Mean: LCL is 3.019, UCL is 3.181. b. Yes. Range: LCL is 0.1845, UCL is 0.7155.

4. Mean: LCL is 78.88 cm. UCL is 81.04 cm.

Range: LCL is 0 cm. UCL is 3.95 cm.

Process in control.

5. a. 1 2 3 4 .020 .010 .025 .045

b. 2.5 percent.

c. Mean  5  .025, standard deviation  5  .011.

d. LCL  5  .0011, UCL  5  .0489.

e. .0456.

f. Yes.

g. Mean  5  .02, standard deviation  5  .01.

h. LCL  5  0, UCL  5  .04.

6. LCL: 0.

UCL: .0234.

Sample #10 is outside of the UCL.

7. Yes, UCL  5  16.266, LCL  5  0.

8. Yes, UCL  5  5.17, LCL  5  0.

9. No, UCL  5  .10, LCL  5  .01. Yes.

10. 20 pieces.

11. One in 30 is “out.” Tolerances seem to be met. Approximately 97% will be acceptable.

12. a. LCL: 3.73.

UCL: 3.97.

Out of control.

b. Random variations.

13. NUMBER OF RUNS

Test Observed Expected Standard

Deviation z Conclude

a. Med . . . 18 14 2.50 1.6 Random U/D. . . . 17 17 2.07 0 Random b. Med. . . . 8 14 2.50 2 2.40 Nonrandom

U/D. . . . 22 17 2.07 2.41 Nonrandom

14. a. Random because both z values are within 6  2

b. Nonrandom because z value for U/D is less than -1.96.

c. Med: z   5  1.11.

U/D: z   5  0.68.

d. Med: z   5   2 1.11.

U/D: z   5   2 1.36.

15. Med: z   5   2 2.34.

U/D: z   5   2 1.45.

16. 200 pieces.

18. a. 566 units.

b. 62 units.

c. $1,160.

ste24102_appA_854-866.indd 857ste24102_appA_854-866.indd 857 11/22/13 2:01 PM11/22/13 2:01 PM

Final PDF to printer

858 Appendix A Answers to Selected Problems

WeekMaster

Quantity

Beg. Inv. 1 2 3 4 5 6

80Schedule

E LT � 2 Beg. Inv. 1 2 3 4 5 6

Gross requirements 80

Scheduled receipts

Projected on hand

Net requirements 80

Planned-order receipts 80

Planned-order releases 80

B (2) LT � 2 Beg. Inv. 1 2 3 4 5 6

Gross requirements

60 6060 60 60 20 20

100

120

160

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases 120

J (4) and J (3) LT � 1 Beg. Inv. 1 2 3 4 5 6

Gross requirements 240

30 3030

160

20 20 20 50 80 50 50

460

180480

480

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases 180480

4. a.

ste24102_appA_854-866.indd 858ste24102_appA_854-866.indd 858 11/22/13 2:01 PM11/22/13 2:01 PM

Final PDF to printer

Appendix A Answers to Selected Problems 859

b. Week

Quantity

4 5 6

70

Master Schedule for: E

Beg. Inv.

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

4

0 0 0 0

5 6

70

70

70

70

E LT � 2 Lot size: Lot-for-Lot

B (2) Beg. Inv.

Gross requirements

60

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

4 5 6

180 40 40

140

120

LT � 2 Lot size: Multiples of 120

J (4) and J (3) Beg. Inv.

Gross requirements

50

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

4 5 6

210

210 30

260 80 80

LT � 1

Lot size: Multiples of 30

Scheduled Receipts (Week 4) � Original amount of 30 �180 � 210 Original on hand amounts (Week 6): B � 20 & J � 50 Revised on hand amounts (Week 6): B � 40 & J � 80 There will be an additional 20 units of B & 30 units of J on hand.

Notes:

ste24102_appA_854-866.indd 859ste24102_appA_854-866.indd 859 11/22/13 2:01 PM11/22/13 2:01 PM

Final PDF to printer

860 Appendix A Answers to Selected Problems

6. DayMaster

Quantity

1 2 3 4 5 6 7

150100 200Schedule

Table 1 2 3 4 5 6 7

Gross requirements 150100 200

Scheduled receipts

Projected on hand

Net requirements 150

150

100

100

200

Planned-order receipts 200

Planned-order releases 200150100

Wood Sections (2) 1 2 3 4 5 6 7

Gross requirements 400

400

100

100

100

100

100

400

300

300

300200

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases 400400

Braces (3) 1 2 3 4 5 6 7

Gross requirements 450 600

450 600

60 60 60

240

450240

300

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases 600450240

Legs (4) 1 2 3 4 5 6 7

Gross requirements 600 800

600 800

120 120 120

280

600 800280

400

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases 800880

Beg. Inv.

Beg. Inv.

Beg. Inv.

Beg. Inv.

60

Beg. Inv.

120

600

ste24102_appA_854-866.indd 860ste24102_appA_854-866.indd 860 11/22/13 2:01 PM11/22/13 2:01 PM

Final PDF to printer

Appendix A Answers to Selected Problems 861

10. Order 160 units of subassembly G in week 2.

11. a. Master Schedule for E.

Week number

Quantity

1 2 3 4 5 6 7

120

8

Item: E LT � 1 week

Gross requirements 120

Scheduled receipts

Projected on hand

Net requirements 120

120Planned-order receipts

Planned-order releases 120

Item: I (2) LT � 1 week 1 2 3 4 5 6 7

Gross requirements

40

4040

200

200

240

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases 200

8

Item: N (4) LT � 2 weeks 1 2 3 4 5 6 7

Gross requirements

100 100 100

700

700

800

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases 700

8

Item: V LT � 2 weeks 1 2 3 4 5 6 7

Gross requirements

190

190

200

10Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases 190

8

ste24102_appA_854-866.indd 861ste24102_appA_854-866.indd 861 11/22/13 2:01 PM11/22/13 2:01 PM

Final PDF to printer

862 Appendix A Answers to Selected Problems

13. c. Master Schedule for golf carts.

15. Labor: 53.3% 106.7% 80% 93.3% Machine: 60% 120% 90% 105%

Chapter 13: Inventory Management

1. a. Item Category b. 180 units. 1 B 2 B 3 C 4 C 5 C 6 A 7 C

2. a. Item Category K34 C K35 A K36 B M10 C M20 C Z45 A F14 B F95 A F99 C D45 B D48 C D52 C D57 B N08 C P05 B P09 C

Week number

Quantity

1 2 3 4 5 6 7

100 100 100

8 9

Item: Golf cart LT � 1 week

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

100

100

100

100 100 100

100 100

100 100

100 100

Item: Bases LT � 1 week

Gross requirements

Scheduled receipts

Projected on hand

Net requirements

Planned-order receipts

Planned-order releases

100

100 50 100 505020202020

0

50

50

50

50

50

50

50

50

50

30

30

50

0 50

100 100

b. Item Category

4021 A 9402 C 4066 B 6500 C 9280 C 4050 C 6850 B 3010 C 4400 B

c. A: 11%, 55.26%.

B: 33%, 28.95%.

C: 56%, 15.79%.

3. a. 18 bags. b. 9 bags.

c. 67.5. d. $1,350

e. Increase by $78.71

4. a. 204 packages.

b. $6,118.82.

c. Yes.

d. No; TC  5  $6,120; only save $1.18.

5. a. $105.29.

6. $364.

7. a. 1–6: 74 units; 7–12: 91 units.

b. EOQ requirement.

c. 1–6: 50 units; 7–12: 100 units.

8. a. $1.32.

b. $54.20.

9. a. 4,812.

b. 15.59 (approx. 16).

c. .96.

10. a. 10,328 bags.

b. 3,098 bags.

c. 10.33 days.

d. 7.75 (approx. 8).

e. $774.50.

11. a. 1,414 units. b. 7.07 days.

c. 424 units. d. No.

f. Approximately 54 units, $168.

ste24102_appA_854-866.indd 862ste24102_appA_854-866.indd 862 11/22/13 2:01 PM11/22/13 2:01 PM

Final PDF to printer

Appendix A Answers to Selected Problems 863

12. a. 37.5 batches.

b. 1,000 units.

c. 625 units.

d. No.

13. a. 5,000 boxes.

b. 3.6 orders.

14. a. 600 stones.

b. 600 stones.

c. 150 stones on hand.

15. Indifferent between 495 and 1,000 pulleys.

16. A, 500 units.

18. 6,600 feet.

19. a. 370 units.

b. 70 units.

c. Both smaller.

20. a. 91 pounds.

b. ROP  5  691 pounds.

c. 50%.

21. a. 8.39 gallons.

b. 34 gallons, .1423.

c. risk  5  .2981.

22. 70.14 gallons.

23. .1093.

24. ROP  5  70.14.

25. a. 400 gallons.

b. 45.02 gallons.

26. a. 72 boxes.

b. .0023.

c. .0228.

27. 749 pounds.

28. a. 134 rolls.

b. About 36 rolls.

29. b. 14 cases.

30. 97.26%

31. Cycle Order Quantity

1 623 2 657 3 562

32. a. P34: ROP = 132 units on hand.

P35: ROP = 153 units on hand.

b. 306 units.

c. 334 units.

34. 25 dozen.

35. a. Nine spares. b. C s  ≤ $10.47.

36. 78.9 pounds.

37. $4.89 per quart.

38. Five cakes.

39. 421.5 pounds.

40. a. $0.53 to $1.76.

c. $56.67 to $190.00.

41. 3 spares.

42. 2 cakes.

43. 16 tickets.

Chapter 14: JIT and Lean Operations

1. 3. 7. 1.35 minutes.

2. 3. 8. 6.50 minutes.

3. 3. 9. 4 minutes.

4. 3 cycles.

5. 2 cycles:

Cycle

1 2

A 11 11 B 6 6 C 2 2 D 9 9 E 4 4

Chapter 14 Supplement: Maintenance 1. Expected recalibration cost  5  $925 a month.

Use the service contract.

2. Expected repair cost  5  $456 a month.

Option #1: $500.

Option #2: $566.

3. Equipment Ratio Interval (days)

A201 .1304 17.76 B400 .0571 25.26 C850 .1104 35.12

Chapter 15: Supply Chain Management

1. Use 2-day freight.

2. Use 6-day.

3. Ship 2-day using A.

Chapter 16: Scheduling

1. 1-A, 2-B, 3-C, TC  5  15.

2. 1-B, 2-C, 3-A, TC  5  21.

3. 1-A, 2-E, 3-D, 4-B, 5-C; or 1-A, 2-D, 3-E, 4-B, 5-C.

4. 1-B, 2-C, 3-D, 4-A, TC  5  26.

5. a. 1-A, 2-B, 3-C, 4-D, 5-E.

b. 1-E, 2-B, 3-C, 4-D, 5-A.

6. b. FCFS SPT EDD CR

Av. flow time. . . . . . 26.5 19.75 21 24.75 Av. job tardiness. . . . . . 11   6 6 9.25 Av. no. of jobs. . . . . . 2.86 2.14 2.27 2.68

7. FCFS: a-b-c-d-e.

SPT: c-b-a-e-d.

EDD: a-b-c-e-d.

CR: a-b-c-e-d (or a-b-e-c-d). FCFS SPT EDD CR

Av. flow time. . . . . . 17.40 14.80 16.80 16.80 Av. job tardiness. . . . . . 5.20 5.40 4.60 4.60 Av. no. of jobs. . . . . . 2.72 2.31 2.63 2.63

9. B-A-G-E-F-D-C.

10. a. e-b-g-h-d-c-a-f.

c. 2 hours.

11. a. B-A-C-E-F-D.

12. a. b-a-c-d-e.

b. 37 minutes.

c. both reduced by 15 minutes.

ste24102_appA_854-866.indd 863ste24102_appA_854-866.indd 863 11/22/13 2:01 PM11/22/13 2:01 PM

Final PDF to printer

864 Appendix A Answers to Selected Problems

8. a. .6881.

b. .3978.

c. .0203.

9. .3479.

10. b. .52.

11. b. .030.

c. .2085.

12. Standard Path Mean Deviation

a-d-e-h. . . . . . 24.34 1.354

a-f-g. . . . . . 15.50 1.258

b-i-j-k. . . . . . 14.83 1.014

c-m-n-o. . . . . . 26.17 1.658

27 weeks: .6742; 26 weeks: .4099.

14. Crash schedule (1 week each): C, C, F, F, E, P.

15. a. Crash four weeks:

(1) 7-11, (2) 1-2, (3) 7-11 and 6-10, (4) 11-13 and 4-6.

17. a. 18.5 days.

b. .67.

Chapter 18: Management of Waiting Lines

1. a. 1) .60

2) .90 customer

3) .30 hr.

b. 1) 2.25 customers.

2) .75.

3) Two hours.

4) .5625.

c. 1) .75

2) 3.429 customers

3) .107 hr.

2. a. 0.67 customer.

b. One minute.

c. 1.33 customers.

3. a. 6 minutes.

b. 0.25.

c. 2.25 customers.

4. a. Morning: 0.375 minute; .45.

Afternoon: 0.678 minute; .54.

Evening: 0.635 minute; .44.

b. M: 4; A: 8; E: 5.

5. a. .45.

b. .229.

c. .509 hour.

d. .28.

6. a. 4.444 trucks.

b. 6.67 minutes.

c. .711.

d. 6 minutes.

e. The system would be overloaded.

f. 13.186.

7. a. One dock.

b. No.

13. G-A-E-D-B-C-F (or G-E-A-D-B-C-F).

14. a., b. Grinding flow time is 93 hours. Total time is 37 hours.

c. Grinding flow time is 107 hours. Total time is 35 hours.

15. a. FCFS SPT EDD CR

Av. flow time. . . . . . 15.25 11.12 15.60 15.60 Av. job tardiness. . . . . . 1.7 2.33 0.55 0.55 Av. no. of jobs. . . . . . 3.91 2.85 4.00 4.00

c. a-c-b-e-d-f.

16. b-c-e-a-d.

19. A-B-C.

20. C-B-A.

21. B-C-D-A.

Chapter 17: Project Management

1. a. 1-3-6-9-11-12: 31.

b. 1-2-5-7-8-9: 55.

c. 1-2-5-12-16: 44.

4. a. Activity Immed. Pred.

A – B – C A D A,B E C

5. a. Summary:

Activity ES EF LF LS Slack

1-2. . . . . . 0 4 11 7 7

2-4. . . . . . 4 13 21 12 8

4-7. . . . . . 13 18 26 21 8

7-10. . . . . . 18 20 28 26 8

10-12. . . . . . 21 24 31 28 7

2-5. . . . . . 4 12 19 11 7

5-8. . . . . . 12 19 26 19 7

8-10. . . . . . 19 21 28 26 7

1-3. . . . . . 0 10 10 0 0

3-6. . . . . . 10 16 16 10 0

6-9. . . . . . 16 20 20 16 0

9-11. . . . . . 20 25 25 20 0

11-12. . . . . . 25 31 31 25 0

b. Summary:

Activity ES EF LF LS Slack

1. . . . . . 0 5 5 0 0

2. . . . . . 5 23 23 5 0

3. . . . . . 5 18 33 20 15

4. . . . . . 23 26 40 37 14

5. . . . . . 23 33 33 23 0

6. . . . . . 33 37 44 40 7

7. . . . . . 33 44 44 33 0

8. . . . . . 44 53 53 44 0

9. . . . . . 53 55 55 53 0 6. 30 weeks.

7. b 24 days: .9686; 21 days: .2350.

c. 24 days: .9328; 21 days: .0186.

d. Crash activities F, C, and G one day each.

ste24102_appA_854-866.indd 864ste24102_appA_854-866.indd 864 11/22/13 2:01 PM11/22/13 2:01 PM

Final PDF to printer

Appendix A Answers to Selected Problems 865

c. (1) A   5  24,  B   5  20,  Z   5  $204. (2) Yes. Labor, 120 hr. (3) No. (4) No. 2. a. S   5  8,  T   5  20,  Z   5  $58.40. b. (1) x 1   5  4.2,  x 2   5  1.6,  Z   5  13.2. (2) Yes. F   5  4.6. (3) No. (4) No. 3. H   5  132 units,  W   5  36 units, Profit  5  $6,360. 4. Deluxe  5  90 bags, Standard  5  60 bags, Profit  5  $243. 5. 500 apple, 200 grape, Revenue  5  $990. Fifty cups of sugar will be

unused. 6. a. x 1   5  4,  x 2   5  0,  x 3   5  18. s 1   5  3,  s 2   5  0,  s 3   5  0. Z   5  106. b. x 1   5  15,  x 2   5  10,  x 3   5  0. s 1   5  0,  s 2   5  0,  s 3   5  5. Z   5  210. 9. A   5  0,  B   5  80,  C   5  50. Z   5  350. C A (insignificance): $ 2 ̀ to $3.04. C B (optimality): $1.95 to $3.75. C C (optimality): $2.00 to $5.00. 11. a. board  5  0, holder  5  50. b. Cutting  5  16 minutes, gluing  5  0 minutes,

finishing  5  210 minutes. 12. a. Ham  5  37.14, deli  5  18, cost  5  $165.42. b. Ham  5  20, deli  5  84, profit  5  $376. 14. Z   5  $433. 15. a. Machine and materials are binding. b. No change. c. No change. d. Only s 2 would change. It would be 46. e. None. f. Yes; $844. 16. a. $1.50; range is 550 to 750. b. $1.50/pound. c. $0; range 375 to infinity. d. None. e. 150 pounds of pine bark. f. Optimal quantities would not change; Z would increase by $75. g. No, Yes, $1,155. h. No.

8. a. 0.952 mechanic.

b. 0.228.

c. 0.056 hr.

d. 0.60.

e. Two.

9. a. 0.995 customer.

b. 2.24 days.

c. 19.9 percent.

d. 0.875 customer.

10. a. .437.

b. 0.53 machine.

c. 1.33 machines.

d. 40.72 pieces.

e. Three.

11. a. 28.56 pieces.

b. Two.

12. a. 15.9 pieces.

b. Three.

13. Three.

14. a. .90.

b. W 1   5  .12 hour.

W 2   5  .3045 hour.

W 3   5  2.13 hours.

c. L 1   5  .365.

L 2   5  .914.

L 3   5  6.395.

15. a. .75.

b. L 1   5  .643.

L 2   5  1.286.

18. a. approx. 0.0116.

b. approx. 0.433.

Chapter 19: Linear Programming

1. a. (1) x 1   5  2,  x 2   5  9,  Z   5  35.

(2) No.

(3) No.

(4) No.

b. (1) x 1   5  1.5,  x 2   5  6.25,  Z   5  65.5.

(2) No.

(3) Yes, S has surplus of 15.

(4) No.

ste24102_appA_854-866.indd 865ste24102_appA_854-866.indd 865 11/22/13 2:01 PM11/22/13 2:01 PM

Final PDF to printer

This page intentionally left blank

867

APPENDIX

A. Areas under the normal curve, 0 to z, page 867

B. Areas under the standardized normal curve

1. From 2 ̀ to 2 z, page 868

2. From 2 ̀ to 1 z, page 869

C. Cumulative Poisson probabilities, page 870

Tables B

Table A Areas under the normal curve, 0 to z 0 z

z .00 .01 .02 .03 .04 .05 .06 .07 .08 .09

0.0 .0000 .0040 .0080 .0120 .0160 .0199 .0239 .0279 .0319 .0359 0.1 .0398 .0438 .0478 .0517 .0557 .0596 .0636 .0675 .0714 .0753 0.2 .0793 .0832 .0871 .0910 .0948 .0987 .1026 .1064 .1103 .1141 0.3 .1179 .1217 .1255 .1293 .1331 .1368 .1406 .1443 .1480 .1517 0.4 .1554 .1591 .1628 .1664 .1700 .1736 .1772 .1808 .1844 .1879

0.5 .1915 .1950 .1985 .2019 .2054 .2088 .2123 .2157 .2190 .2224 0.6 .2257 .2291 .2324 .2357 .2389 .2422 .2454 .2486 .2517 .2549 0.7 .2580 .2611 .2642 .2673 .2703 .2734 .2764 .2794 .2823 .2852 0.8 .2881 .2910 .2939 .2967 .2995 .3023 .3051 .3078 .3106 .3133 0.9 .3159 .3186 .3212 .3238 .3264 .3289 .3315 .3340 .3365 .3389

1.0 .3413 .3438 .3461 .3485 .3508 .3531 .3554 .3577 .3599 .3621 1.1 .3643 .3665 .3686 .3708 .3729 .3749 .3770 .3790 .3810 .3830 1.2 .3849 .3869 .3888 .3907 .3925 .3944 .3962 .3980 .3997 .4015 1.3 .4032 .4049 .4066 .4082 .4099 .4115 .4131 .4147 .4162 .4177 1.4 .4192 .4207 .4222 .4236 .4251 .4265 .4279 .4292 .4306 .4319

1.5 .4332 .4345 .4357 .4370 .4382 .4394 .4406 .4418 .4429 .4441 1.6 .4452 .4463 .4474 .4484 .4495 .4505 .4515 .4525 .4535 .4545 1.7 .4554 .4564 .4573 .4582 .4591 .4599 .4608 .4616 .4625 .4633 1.8 .4641 .4649 .4656 .4664 .4671 .4678 .4686 .4693 .4699 .4706 1.9 .4713 .4719 .4726 .4732 .4738 .4744 .4750 .4756 .4761 .4767

2.0 .4772 .4778 .4783 .4788 .4793 .4798 .4803 .4808 .4812 .4817 2.1 .4821 .4826 .4830 .4834 .4838 .4842 .4846 .4850 .4854 .4857 2.2 .4861 .4864 .4868 .4871 .4875 .4878 .4881 .4884 .4887 .4890 2.3 .4893 .4896 .4898 .4901 .4904 .4906 .4909 .4911 .4913 .4916 2.4 .4918 .4920 .4922 .4925 .4927 .4929 .4931 .4932 .4934 .4936

2.5 .4938 .4940 .4941 .4943 .4945 .4946 .4948 .4949 .4951 .4952 2.6 .4953 .4955 .4956 .4957 .4959 .4960 .4961 .4962 .4963 .4964 2.7 .4965 .4966 .4967 .4968 .4969 .4970 .4971 .4972 .4973 .4974 2.8 .4974 .4975 .4976 .4977 .4977 .4978 .4979 .4979 .4980 .4981 2.9 .4981 .4982 .4982 .4983 .4984 .4984 .4985 .4985 .4986 .4986

3.0 .4987 .4987 .4987 .4988 .4988 .4989 .4989 .4989 .4990 .4990

ste24102_appB_867-871.indd 867ste24102_appB_867-871.indd 867 11/22/13 2:04 PM11/22/13 2:04 PM

Final PDF to printer

868 Appendix B Tables

0–z

Table B 1. Areas under the standardized normal curve, from 2 ̀ to 2 z

.09 .08 .07 .06 .05 .04 .03 .02 .01 .00 z

.0002 .0003 .0003 .0003 .0003 .0003 .0003 .0003 .0003 .0003 23.4

.0003 .0004 .0004 .0004 .0004 .0004 .0004 .0005 .0005 .0005 23.3

.0005 .0005 .0005 .0006 .0006 .0006 .0006 .0006 .0007 .0007 23.2

.0007 .0007 .0008 .0008 .0008 .0008 .0009 .0009 .0009 .0010 23.1

.0010 .0010 .0011 .0011 .0011 .0012 .0012 .0013 .0013 .0013 23.0

.0014 .0014 .0015 .0015 .0016 .0016 .0017 .0018 .0018 .0019 22.9

.0019 .0020 .0021 .0021 .0022 .0023 .0023 .0024 .0025 .0026 22.8

.0026 .0027 .0028 .0029 .0030 .0031 .0032 .0033 .0034 .0035 22.7

.0036 .0037 .0038 .0039 .0040 .0041 .0043 .0044 .0045 .0047 22.6

.0048 .0049 .0051 .0052 .0054 .0055 .0057 .0059 .0060 .0062 22.5

.0064 .0066 .0068 .0069 .0071 .0073 .0075 .0078 .0080 .0082 22.4

.0084 .0087 .0089 .0091 .0094 .0096 .0099 .0102 .0104 .0107 22.3

.0110 .0113 .0116 .0119 .0122 .0125 .0129 .0132 .0136 .0139 22.2

.0143 .0146 .0150 .0154 .0158 .0162 .0166 .0170 .0174 .0179 22.1

.0183 .0188 .0192 .0197 .0202 .0207 .0212 .0217 .0222 .0228 22.0

.0233 .0239 .0244 .0250 .0256 .0262 .0268 .0274 .0281 .0287 21.9

.0294 .0301 .0307 .0314 .0322 .0329 .0336 .0344 .0351 .0359 21.8

.0367 .0375 .0384 .0392 .0401 .0409 .0418 .0427 .0436 .0446 21.7

.0455 .0465 .0475 .0485 .0495 .0505 .0516 .0526 .0537 .0548 21.6

.0559 .0571 .0582 .0594 .0606 .0618 .0630 .0643 .0655 .0668 21.5

.0681 .0694 .0708 .0721 .0735 .0749 .0764 .0778 .0793 .0808 21.4

.0823 .0838 .0853 .0869 .0885 .0901 .0918 .0934 .0951 .0968 21.3

.0985 .1003 .1020 .1038 .1056 .1075 .1093 .1112 .1131 .1151 21.2

.1170 .1190 .1210 .1230 .1251 .1271 .1292 .1314 .1335 .1357 21.1

.1379 .1401 .1423 .1446 .1469 .1492 .1515 .1539 .1562 .1587 21.0

.1611 .1635 .1660 .1685 .1711 .1736 .1762 .1788 .1814 .1841 20.9

.1867 .1894 .1922 .1949 .1977 .2005 .2033 .2061 .2090 .2119 20.8

.2148 .2177 .2206 .2236 .2266 .2296 .2327 .2358 .2389 .2420 20.7

.2451 .2483 .2514 .2546 .2578 .2611 .2643 .2676 .2709 .2743 20.6

.2776 .2810 .2843 .2877 .2912 .2946 .2981 .3015 .3050 .3085 20.5

.3121 .3156 .3192 .3228 .3264 .3300 .3336 .3372 .3409 .3446 20.4

.3483 .3520 .3557 .3594 .3632 .3669 .3707 .3745 .3783 .3821 20.3

.3859 .3897 .3936 .3974 .4013 .4052 .4090 .4129 .4168 .4207 20.2

.4247 .4286 .4325 .4364 .4404 .4443 .4483 .4522 .4562 .4602 20.1

.4641 .4681 .4721 .4761 .4801 .4840 .4880 .4920 .4960 .5000 20.0

ste24102_appB_867-871.indd 868ste24102_appB_867-871.indd 868 11/22/13 2:04 PM11/22/13 2:04 PM

Final PDF to printer

Appendix B Tables 869

Table B 2. Areas under the standardized normal curve, from 2 ̀ to 1 z

0 z

z .00 .01 .02 .03 .04 .05 .06 .07 .08 .09

.0 .5000 .5040 .5080 .5120 .5160 .5199 .5239 .5279 .5319 .5359 .1 .5398 .5438 .5478 .5517 .5557 .5596 .5636 .5675 .5714 .5753 .2 .5793 .5832 .5871 .5910 .5948 .5987 .6026 .6064 .6103 .6141 .3 .6179 .6217 .6255 .6293 .6331 .6368 .6406 .6443 .6480 .6517 .4 .6554 .6591 .6628 .6664 .6700 .6736 .6772 .6808 .6844 .6879

.5 .6915 .6950 .6985 .7019 .7054 .7088 .7123 .7157 .7190 .7224 .6 .7257 .7291 .7324 .7357 .7389 .7422 .7454 .7486 .7517 .7549 .7 .7580 .7611 .7642 .7673 .7703 .7734 .7764 .7794 .7823 .7852 .8 .7881 .7910 .7939 .7967 .7995 .8023 .8051 .8078 .8106 .8133 .9 .8159 .8186 .8212 .8238 .8264 .8289 .8315 .8340 .8365 .8389

1.0 .8413 .8438 .8461 .8485 .8508 .8531 .8554 .8577 .8599 .8621 1.1 .8643 .8665 .8686 .8708 .8729 .8749 .8770 .8790 .8810 .8830 1.2 .8849 .8869 .8888 .8907 .8925 .8944 .8962 .8980 .8997 .9015 1.3 .9032 .9049 .9066 .9082 .9099 .9115 .9131 .9147 .9162 .9177 1.4 .9192 .9207 .9222 .9236 .9251 .9265 .9279 .9292 .9306 .9319

1.5 .9332 .9345 .9357 .9370 .9382 .9394 .9406 .9418 .9429 .9441 1.6 .9452 .9463 .9474 .9484 .9495 .9505 .9515 .9525 .9535 .9545 1.7 .9554 .9564 .9573 .9582 .9591 .9599 .9608 .9616 .9625 .9633 1.8 .9641 .9649 .9656 .9664 .9671 .9678 .9686 .9693 .9699 .9706 1.9 .9713 .9719 .9726 .9732 .9738 .9744 .9750 .9756 .9761 .9767

2.0 .9772 .9778 .9783 .9788 .9793 .9798 .9803 .9808 .9812 .9817 2.1 .9821 .9826 .9830 .9834 .9838 .9842 .9846 .9850 .9854 .9857 2.2 .9861 .9864 .9868 .9871 .9875 .9878 .9881 .9884 .9887 .9890 2.3 .9893 .9896 .9898 .9901 .9904 .9906 .9909 .9911 .9913 .9916 2.4 .9918 .9920 .9922 .9925 .9927 .9929 .9931 .9932 .9934 .9936

2.5 .9938 .9940 .9941 .9943 .9945 .9946 .9948 .9949 .9951 .9952 2.6 .9953 .9955 .9956 .9957 .9959 .9960 .9961 .9962 .9963 .9964 2.7 .9965 .9966 .9967 .9968 .9969 .9970 .9971 .9972 .9973 .9974 2.8 .9974 .9975 .9976 .9977 .9977 .9978 .9979 .9979 .9980 .9981 2.9 .9981 .9982 .9982 .9983 .9984 .9984 .9985 .9985 .9986 .9986

3.0 .9987 .9987 .9987 .9988 .9988 .9989 .9989 .9989 .9990 .9990 3.1 .9990 .9991 .9991 .9991 .9992 .9992 .9992 .9992 .9993 .9993 3.2 .9993 .9993 .9994 .9994 .9994 .9994 .9994 .9995 .9995 .9995 3.3 .9995 .9995 .9995 .9996 .9996 .9996 .9996 .9996 .9996 .9997 3.4 .9997 .9997 .9997 .9997 .9997 .9997 .9997 .9997 .9997 .9998

ste24102_appB_867-871.indd 869ste24102_appB_867-871.indd 869 11/28/13 11:42 PM11/28/13 11:42 PM

Final PDF to printer

870 Appendix B Tables

Table C Cumulative Poisson probabilities

c0 x

P (x )

P (x c ) = x = c

x = 0

µ x • e–µ x !

m\x 0 1 2 3 4 5 6 7 8 9

0.05 .951 .999 1.000 0.10 .905 .995 1.000 0.15 .861 .990 .999 1.000 0.20 .819 .982 .999 1.000

0.25 .779 .974 .998 1.000 0.30 .741 .963 .996 1.000 0.35 .705 .951 .994 1.000 0.40 .670 .938 .992 .999 1.000 0.45 .638 .925 .989 .999 1.000

0.50 .607 .910 .986 .998 1.000 0.55 .577 .894 .982 .998 1.000 0.60 .549 .878 .977 .997 1.000 0.65 .522 .861 .972 .996 .999 1.000 0.70 .497 .844 .966 .994 .999 1.000

0.75 .472 .827 .960 .993 .999 1.000 0.80 .449 .809 .953 .991 .999 1.000 0.85 .427 .791 .945 .989 .998 1.000 0.90 .407 .772 .937 .987 .998 1.000 0.95 .387 .754 .929 .984 .997 1.000

1.0 .368 .736 .920 .981 .996 .999 1.000 1.1 .333 .699 .900 .974 .995 .999 1.000 1.2 .301 .663 .880 .966 .992 .998 1.000 1.3 .273 .627 .857 .957 .989 .998 1.000 1.4 .247 .592 .833 .946 .986 .997 .999 1.000

1.5 .223 .558 .809 .934 .981 .996 .999 1.000 1.6 .202 .525 .783 .921 .976 .994 .999 1.000 1.7 .183 .493 .757 .907 .970 .992 .998 1.000 1.8 .165 .463 .731 .891 .964 .990 .997 .999 1.000 1.9 .150 .434 .704 .875 .956 .987 .997 .999 1.000

2.0 .135 .406 .677 .857 .947 .983 .995 .999 1.000 2.2 .111 .355 .623 .819 .928 .975 .993 .998 1.000 2.4 .091 .308 .570 .779 .904 .964 .988 .997 .999 1.000 2.6 .074 .267 .518 .736 .877 .951 .983 .995 .999 1.000 2.8 .061 .231 .470 .692 .848 .935 .976 .992 .998 .999

ste24102_appB_867-871.indd 870ste24102_appB_867-871.indd 870 11/22/13 2:04 PM11/22/13 2:04 PM

Final PDF to printer

m \x

0 1

2 3

4 5

6 7

8 9

10 11

12 13

14 15

16 17

18 19

20

3. 0

.0 50

.1 99

.4 23

.6 47

.8 15

.9 16

.9 66

.9 88

.9 96

.9 99

1. 00

0 3.

2 .0

41 .1

71 .3

80 .6

03 .7

81 .8

95 .9

55 .9

83 .9

94 .9

98 1.

00 0

3. 4

.0 33

.1 47

.3 40

.5 58

.7 44

.8 71

.9 42

.9 77

.9 92

.9 97

.9 99

1. 00

0 3.

6 .0

27 .1

26 .3

03 .5

15 .7

06 .8

44 .9

27 .9

69 .9

88 .9

96 .9

99 1.

00 0

3. 8

.0 22

.1 07

.2 69

.4 74

.6 68

.8 16

.9 09

.9 60

.9 84

.9 94

.9 98

.9 99

1. 00

0

4. 0

.0 18

.0 92

.2 38

.4 33

.6 29

.7 85

.8 89

.9 49

.9 79

.9 92

.9 97

.9 99

1. 00

0 4.

2 .0

15 .0

78 .2

10 .3

95 .5

90 .7

53 .8

68 .9

36 .9

72 .9

89 .9

96 .9

99 1.

00 0

4. 4

.0 12

.0 66

.1 85

.3 59

.5 51

.7 20

.8 44

.9 21

.9 64

.9 85

.9 94

.9 98

.9 99

1. 00

0 4.

6 .0

10 .0

56 .1

63 .3

26 .5

13 .6

86 .8

18 .9

05 .9

55 .9

80 .9

92 .9

97 .9

99 1.

00 0

4. 8

.0 08

.0 48

.1 43

.2 94

.4 76

.6 51

.7 91

.8 87

.9 44

.9 75

.9 90

.9 96

.9 99

1. 00

0

5. 0

.0 07

.0 40

.1 25

.2 65

.4 41

.6 16

.7 62

.8 67

.9 32

.9 68

.9 86

.9 95

.9 98

.9 99

1. 00

0 5.

2 .0

06 .0

34 .1

09 .2

38 .4

06 .5

81 .7

32 .8

45 .9

18 .9

60 .9

82 .9

93 .9

97 .9

99 1.

00 0

5. 4

.0 05

.0 29

.0 95

.2 13

.3 73

.5 46

.7 02

.8 22

.9 03

.9 51

.9 78

.9 90

.9 96

.9 99

1. 00

0 5.

6 .0

04 .0

24 .0

82 .1

91 .3

42 .5

12 .6

70 .7

97 .8

86 .9

41 .9

72 .9

88 .9

95 .9

98 .9

99 1.

00 0

5. 8

.0 03

.0 21

.0 72

.1 70

.3 13

.4 78

.6 38

.7 71

.8 67

.9 29

.9 65

.9 84

.9 93

.9 97

.9 99

1. 00

0

6. 0

.0 03

.0 17

.0 62

.1 51

.2 85

.4 46

.6 06

.7 44

.8 47

.9 16

.9 57

.9 80

.9 91

.9 96

.9 99

.9 99

1. 00

0 6.

2 .0

02 .0

15 .0

54 .1

34 .2

59 .4

14 .5

74 .7

16 .8

26 .9

02 .9

49 .9

75 .9

89 .9

95 .9

98 .9

99 1.

00 0

6. 4

.0 02

.0 12

.0 46

.1 19

.2 35

.3 84

.5 42

.6 87

.8 03

.8 86

.9 39

.9 69

.9 86

.9 94

.9 97

.9 99

1. 00

0 6.

6 .0

01 .0

10 .0

40 .1

05 .2

13 .3

55 .5

11 .6

58 .7

80 .8

69 .9

27 .9

63 .9

82 .9

92 .9

97 .9

99 .9

99 1.

00 0

6. 8

.0 01

.0 09

.0 34

.0 93

.1 92

.3 27

.4 80

.6 28

.7 55

.8 50

.9 15

.9 55

.9 78

.9 90

.9 96

.9 98

.9 99

1. 00

0

7. 0

.0 01

.0 07

.0 30

.0 82

.1 73

.3 01

.4 50

.5 99

.7 29

.8 30

.9 01

.9 47

.9 73

.9 87

.9 94

.9 98

.9 99

1. 00

0 7.

2 .0

01 .0

06 .0

25 .0

72 .1

56 .2

76 .4

20 .5

69 .7

03 .8

10 .8

87 .9

37 .9

67 .9

84 .9

93 .9

97 .9

99 .9

99 1.

00 0

7. 4

.0 01

.0 05

.0 22

.0 63

.1 40

.2 53

.3 92

.5 39

.6 76

.7 88

.8 71

.9 26

.9 61

.9 80

.9 91

.9 96

.9 98

.9 99

1. 00

0 7.

6 .0

01 .0

04 .0

19 .0

55 .1

25 .2

31 .3

65 .5

10 .6

48 .7

65 .8

54 .9

15 .9

54 .9

76 .9

89 .9

95 .9

98 .9

99 1.

00 0

7. 8

.0 00

.0 04

.0 16

.0 48

.1 12

.2 10

.3 38

.4 81

.6 20

.7 41

.8 35

.9 02

.9 45

.9 71

.9 86

.9 93

.9 97

.9 99

1. 00

0

8. 0

.0 00

.0 03

.0 14

.0 42

.1 00

.1 91

.3 13

.4 53

.5 93

.7 17

.8 16

.8 88

.9 36

.9 66

.9 83

.9 92

.9 96

.9 98

.9 99

1. 00

0 8.

2 .0

00 .0

03 .0

12 .0

37 .0

89 .1

74 .2

90 .4

25 .5

66 .6

92 .7

96 .8

73 .9

26 .9

60 .9

79 .9

90 .9

95 .9

98 .9

99 1.

00 0

8. 4

.0 00

.0 02

.0 10

.0 32

.0 79

.1 57

.2 67

.4 00

.5 37

.6 66

.7 74

.8 57

.9 15

.9 52

.9 75

.9 87

.9 94

.9 97

.9 99

1. 00

0 8.

6 .0

00 .0

02 .0

09 .0

30 .0

70 .1

42 .2

46 .3

73 .5

09 .6

40 .7

52 .8

49 .9

09 .9

49 .9

73 .9

86 .9

93 .9

97 .9

99 1.

00 0

8. 8

.0 00

.0 02

.0 07

.0 24

.0 62

.1 28

.2 26

.3 48

.4 82

.6 14

.7 29

.8 22

.8 89

.9 35

.9 64

.9 81

.9 90

.9 95

.9 98

.9 99

1. 00

0

9. 0

.0 00

.0 01

.0 06

.0 21

.0 55

.1 16

.2 07

.3 24

.4 56

.5 87

.7 06

.8 03

.8 76

.9 26

.9 59

.9 78

.9 89

.9 95

.9 98

.9 99

1. 00

0 9.

5 .0

00 .0

01 .0

04 .0

15 .0

40 .0

89 .1

65 .2

69 .3

92 .5

22 .6

45 .7

52 .8

36 .8

98 .9

40 .9

67 .9

82 .9

91 .9

96 .9

98 .9

99

Ta b le

C

(c on

cl ud

ed )

871

ste24102_appB_867-871.indd 871ste24102_appB_867-871.indd 871 11/22/13 2:04 PM11/22/13 2:04 PM

Final PDF to printer

872

The normal distribution is a theoretical distribution that approximates many real-life phenomena. It is widely used in many disciplines, including operations management. Consequently, having the ability to work with normal distributions is a skill that will serve you well.

The normal curve is symmetrical and bell-shaped, as illustrated in Figure C.1 . Although the theoretical distribution extends in both directions, to plus or minus infi nity, most of the distribution lies close to its mean, so values of a variable that is normally distributed will occur relatively close to the distribution mean.

Working with the Normal Distribution C APPENDIX

FIGURE C.1 The normal distribution

Mean

z Values It is customary to refer to a value of a normally distributed random variable in terms of the number of standard deviations the value is from the mean of the distribution. This is known as its z value, or z score. In Figure C.2 you can see the normal distribution in terms of some selected z values. This particular distribution is referred to as the standard normal distribution. Notice that the z values to the left of (i.e., below) the mean are negative. Thus, a z value of 2 1.25 refers to a value that is 1.25 standard deviations below the distribution mean.

FIGURE C.2 The standard normal distribution with selected values of z

–3 –2 –1 0 1 2 3

y

z

When working with a variable that is normally distributed, it is often necessary to convert an actual value of the variable to a z value. The z value can be computed using the following formula:

z

x �

� �

� where x 5 A specified value of a variable

m 5 The distribution mean

s 5 The distribution standard deviation

ste24102_appC_872-876.indd 872ste24102_appC_872-876.indd 872 11/22/13 2:11 PM11/22/13 2:11 PM

Final PDF to printer

Appendix C Working with the Normal Distribution 873

A normal distribution has a mean of 20 and a standard deviation of 2. What is the z value of 17.5? E X A M P L E 1

x 5 17.5 m 5 20 s 5 2 Using the formula for z, we fi nd:

z x

z

� � �

� �

� � 17.5 20

2 1.25

S O L U T I O N

z Values and Probabilities Once the z value is known, it can be used to obtain various probabilities by referring to a table of the normal distribution, such as the probability that a value will occur by chance that is greater than, or less than, that value. Note that the probability of exactly that value is zero, because there are an infinite number of values that could occur, so the probability of specifying in advance that any one particular value will occur is essentially equal to zero. z values can also be used to find the probability that a value will occur that is between 6 z. Two such cases are shown in Figure C.3 . Note that the total area under- neath the curve represents 100 percent of the probability, so knowing that the probability that a value will occur that is within the range, say, of z   5   6 2 is .9544, we can say that the probability that a value will occur that is outside of the range (e.g., either less than z   5   2 2 or greater than z   5   1 2) is equal to 1.0000  2  .9544  5  .0456.

FIGURE C.3 Areas under the normal curve between z   5   6 2 s and z   5   6 3 s

σ=Standard deviation

Mean

95.44%

99.74%

-3σ -2σ +2σ +3σ

Tables of the Normal Distribution Virtually all applications of the normal distribution involve working with a table of normal distribution probabilities. Tables make the process of obtaining probabilities and z values quite simple. This book has two slightly different normal distribution tables. Appendix B Table A has values for the right half of the distribution for the area under the curve (note the fi gure at the top of the table), which is the probability from the mean of the distribution ( z   5  0) to any other value of z, up to z   5   1 3.09. Statistics books always have this version of the table, so you may already be familiar with it. A second table of normal probabilities is presented in Appendix B Tables B1 and B2. They show the area under the curve from negative infi nity to any point z (see the fi gure at the top of the table), up to z   5   1 3.49. In both tables, the values of z are shown in two parts. The integer and fi rst decimal are shown along the side of the table, while the second decimal is shown across the top.

ste24102_appC_872-876.indd 873ste24102_appC_872-876.indd 873 11/22/13 2:11 PM11/22/13 2:11 PM

Final PDF to printer

874 Appendix C Working with the Normal Distribution

Using Appendix B Table B.2, fi nd the area under the curve to the left of z   5  1.12. E X A M P L E 2

S O L U T I O N

1.12 becomes 1.1 .02

1.12

z �

Find the row where z   5  1.1 down the left-hand side of the table. Find the .02 column across the top of the table. The probability is at the intersection of the 1.1 row and the .02 column.

z .00 .01 .02 .03 .04 .05 .06 .07 .08 .09

.0 .5000 .5040 .5080 .5120 .5160 .5199 .5239 .5279 .5319 .5359 .1 .5398 .5438 .5478 .5517 .5557 .5596 .5636 .5675 .5714 .5753 .2 .5793 .5832 .5871 .5910 .5948 .5987 .6026 .6064 .6103 .6141 .3 .6179 .6217 .6255 .6293 .6331 .6368 .6406 .6443 .6480 .6517 .4 .6554 .6591 .6628 .6664 .6700 .6736 .6772 .6808 .6844 .6879

.5 .6915 .6950 .6985 .7019 .7054 .7088 .7123 .7157 .7190 .7224 .6 .7257 .7291 .7324 .7357 .7389 .7422 .7454 .7486 .7517 .7549 .7 .7580 .7611 .7642 .7673 .7703 .7734 .7764 .7794 .7823 .7852 .8 .7881 .7910 .7939 .7967 .7995 .8023 .8051 .8078 .8106 .8133 .9 .8159 .8186 .8212 .8238 .8264 .8289 .8315 .8340 .8365 .8389

1.0 .8413 .8438 .8461 .8485 .8508 .8531 .8554 .8577 .8599 .8621 1.1 .8643 .8665 .8686 .8708 .8729 .8749 .8770 .8790 .8810 .8830 1.2 .8849 .8869 .8888 .8907 .8925 .8944 .8962 .8980 .8997 .9015 1.3 .9032 .9049 .9066 .9082 .9099 .9115 .9131 .9147 .9162 .9177 1.4 .9192 .9207 .9222 .9236 .9251 .9265 .9279 .9292 .9306 .9319

Note: You will fi nd versions of both tables at the very end of the book for easy reference. The last table repeats Appendix B Table A. The other table repeats Appendix B Table B.2., the positive values of z. For problems that involve negative values of z, refer to the portion of Appendix B Table B.1. on p. 868.

Finding a Probability of Observing a Value That Is Within �   z of the Mean or Outside of �   z Use Appendix B Table A for this type of problem:

E X A M P L E 3 Find the area under the curve that is within two standard deviations of the mean.

S O L U T I O N What the problems is asking for:

z = 0z = –2 z = +2

Appendix B Table A provides the right half of the area:

ste24102_appC_872-876.indd 874ste24102_appC_872-876.indd 874 11/22/13 2:11 PM11/22/13 2:11 PM

Final PDF to printer

Appendix C Working with the Normal Distribution 875

= 0 z = +2

To fi nd the total area between 6   z   5  2, double the amount in the right half: 2(.4772)  5  .9544.

The shaded area is .4772

E X A M P L E 4 Find the area under the curve that is outside of two standard deviations from the mean.

S O L U T I O N What the problem is asking for:

z = +2z = –2 0

Appendix B Table A provides the right half of the area between the mean and z   5   1 2. To fi nd the area in the right tail, subtract the amount between the mean and z   5   1 2 from .5000:

= 0 z = +2 The same amount will be in each tail, so the total area in both tails is 2(.0228)  5  .0456.

.0228.0228

−2 0 +2

Another way to arrive at the same answer is to note that the area within two standard deviations of the mean is .9544, as shown previously, so the area outside of that is 1.0000  2  .9544  5  .0456.

Area under the right side of the curve: .5000 Subtract the area from z   5  0 to z   5   1 2.00: 2 .4772 The area to the right of z   5   1 2.00 is: .0228

Finding an Area (Probability) That Is to the Left or to the Right of z Use Appendix B Table B.2 for this type of problem (e.g., “What is the probability that the time will not exceed 22 weeks?”).

E X A M P L E 5 A normal distribution has a mean of 20 and a standard deviation of 1.0. Find the probabilities: a. A value that is 22 or less.

b. A value that is 22 or more.

P(x ≤ 22)

P(x ≥ 22)

ste24102_appC_872-876.indd 875ste24102_appC_872-876.indd 875 11/22/13 2:11 PM11/22/13 2:11 PM

Final PDF to printer

876 Appendix C Working with the Normal Distribution

First, determine the value of z for 22:

z

x �

� �

� �

� � �

22 20

1 2.00

a. From Appendix B Table B, the area (probability) to the left of z   5   1 2.00 is .9772.

b. Because the total area under the curve is 100 percent, or 1.0000, the area to the right of z   5   1 2.00 is simply 1.0000  2  .9772  5  .0228.

S O L U T I O N

Points to Remember

1. The area under a normal curve represents probability.

2. The area under the curve is 100 percent, or 1.0000.

3. The area on either side of the mean is equal to half of the total, which is 50 percent, or .5000.

4. The curve extends to 6   infinity, but 99.74 percent of the values will occur within 6 3 standard deviations of the mean.

5. It is best to use Appendix B Table A for problems involving 6 z (i.e., Chapters 7 and 10), and to use Appen- dix B Table B for problems involving one-sided probabilities such as the probability that x will be no more than a given (i.e., Chapters 4S, 13, and 17).

6. The probability of an exact value (e.g., 22 in Example 5) is zero. Therefore, P ( x # 22)  5   P ( x , 22).

Test Yourself

1. Suppose a normal distribution has a mean of 40 and a standard deviation of 5. Find the value of z for each of these values:

a. 48 b. 30

c. 34 d. 52.5

2. Using Appendix B Table A, find the area between 6 z when z is:

a. 1.00 b. 1.96

c. 2.10 d. 2.50

3. Find the probability of observing a value that is beyond 6 z when z is:

a. 1.00 b. 1.80

c. 1.88 d. 2.54

4. Use the appropriate Appendix B Table to find the probability of a value that does not exceed a z value of:

a. .40 b. 1.27

c. 2 1.32 d. 2.75

5. Find the probability of observing a value that is more than a z value of:

a. .77 b. 1.65

c. 2 1.32 d. 2.75

Answers

1. a. 1 1.60 b. 2 2.00

c. 2 1.20 d. 1 2.50

2. a. .6826 b. .9500

c. .9642 d. .9876

3. a. .3174 b. .0718

c. .0602 d. .0110

4. a. .6554 b. .8980

c. .0934 d. .9970

5. a. .2206 b. .0495

c. .9066 d. .0030

ste24102_appC_872-876.indd 876ste24102_appC_872-876.indd 876 11/22/13 2:11 PM11/22/13 2:11 PM

Final PDF to printer

877

Chapter 1 Page 3: Michie Turpin/Piedmont Healthcare; p. 8: Courtesy of NCR; p. 14: Doug Letterman/Creative Commons; p. 15: Courtesy of Trek Bicycle Corporation; p. 22: © Rykoff Collection/Corbis; p. 28: Photo by Getty Images for Puma; p. 29: Photo by Mario Tama/Getty Images; p. 31: Courtesy of Marks & Spencer; p. 34-35 (all): Courtesy of Wegmans Food Markets, Inc.

Chapter 2 Page 41: Peter Charlesworth/LightRocket via Getty Images; p. 43: Terry Vine/Blend Images/Getty Images RF; p. 44: Uwe Zucchi/AFP/Getty Images; p. 51: The McGraw-Hill Companies, Inc./Christopher Kerrigan, photographer; p. 55: Courtesy of Apple Inc.; p. 57: Courtesy of Hyundai Motor Group.

Chapter 3 Page 75: Photodisc/Getty Images RF; p. 76: Peter Cosgrove/AP Images; p. 96 (left): © Dynamic Graphics Group/PunchStock RF; p. 96 (right): © The Toro Company. All rights reserved; p. 105: © Andrew McLachlan/All Canada Photos/Corbis.

Chapter 4 Page 135: General Motors LLC, used with permission GM Media Archive/Steve Fecht, photographer; p. 138: Courtesy of Dutch Boy; p. 140: Courtesy of Pinnacle Foods Corporation; p. 142: Bloomberg via Getty Images; p. 146: James F. Quinn KRT/Newscom; p. 148: © Jack Star/Photolink/Getty Images RF; p. 150 (left): Courtesy of Technogym; p. 150 (right): Courtesy of Hettich/Rehau. Design by Dmitriy Sergeev; p. 153: Liu Zheng/Color- ChinaPhoto/AP Images; p. 161: © Iain Masterton/Alamy.

Chapter 5 Page 185 (left): Mark Peterson/Redux; p. 185 (right): Grant Faint/Getty Images; p. 187: Thomas Coex/APF/ Getty Images; p. 190 (left): © Mark Richards/PhotoEdit; p. 190 (right): © Brand X Pictures/PunchStock RF; p. 198 (both): © Royalty-Free/Corbis.

Chapter 6 Page 237: © Jeff Gilbert/Alamy; p. 239 (top-left, bottom- right): © Royalty-Free/Corbis; p. 239 (top-right): © Don Tremain/Getty Images RF; p. 239 (bottom-left):

Photo Credits

© Keith Dannemiller/Corbis; p. 247: © Brand X Pictures/ PunchStock RF; p. 248: © Franck Robichon/epa/Corbis; p. 249: Bill Pugliano/Getty Images; p. 252: Floto 1 War- ner/OTTO; p. 255: Courtesy of Cunard Line; p. 259: ©Reuters/Corbis; p. 261 (left): Oleksiy Maksymenko/ Getty Images; p. 261 (right): PhotoInc/Getty Images RF.

Chapter 7 Page 289: Getty Images RF; p. 290: Courtesy of Human- tech Inc.; p. 292: John Harrelson/Getty Images for NAS- CAR; p. 297: Google and the Google logo are registered trademarks of Google Inc., used with permission; p. 300 (both): Courtesy of Peak Ergonomics www.Healthy- WorkSolutions.com .

Chapter 8 Page 337: © Tom Salyer/Alamy; p. 338: U.S. Coast Guard photo by Petty Officer 2nd Class Jetta H. Disco; p. 341: © Richard J Greenman/Alamy; p. 343: William Cho/Creative Commons; p. 348: © McGraw-Hill Com- panies/Jill Braaten, photographer.

Chapter 9 Page 367: Thomas Samson/AFP/Getty Images; p. 370: Richard Drew/AP Images; p. 375: John Zich/Bloomberg via Getty Images; p. 381: NIST public domain; p. 383: Jay Mallin/Bloomberg via Getty Images; p. 386: Paul Sakuma/AP Images; p. 399: Ryan Anson/ Bloomberg via Getty Images.

Chapter 10 Page 411: Gabriela Maj/Bloomberg via Getty Images; p. 413: Tim Boyle/Bloomberg via Getty Images; p. 416: Jay Reeves/AP Images; p. 417: © Chang W. Lee/The New York Times/Redux; p. 419: © Omron Electronics LLC; p. 426: © Jim Richardson/Corbis; p. 436: © Royalty-Free/Corbis; p. 441: Corbis Super RF/Alamy.

Chapter 11 Page 457: © 2013 Nikon UK Ltd.; p. 458: Courtesy of Toyota Motor Corporation, U.S.A., Inc.; p. 464: Scott Sady/AP Images; p. 476: © Chuck Pefley/Alamy.

Chapter 12 Page 495: © Tesla Motors; p. 500: Courtesy of VX Corporation; p. 542: Courtesy of L. & J.G. Stickley.

Chapter 13 Page 547: Kris Tripplaar/Sipa USA/Newscom; p. 549: Courtesy of Motorola; p. 552: DreamPictures/Shannon Faulk/Getty Images RF; p. 554: 2007 Getty Images RF.

Chapter 14 Page 605: Lennox McLendon/AP Images; p. 608: Courtesy of Ford Motor Company; p. 613: © Alexandra Boulat/VII/Corbis; p. 615: Marcos Issa/Bloomberg via Getty Images; p. 617: General Motors LLC, used with permission GM Media Archive; p. 621 (both): Tri State Industries, footage courtesy of Mac Lean Media, Inc.; p. 631: Image courtesy of CareFusion. All rights reserved. Pyxis ProcedureStation is a registered trademark of CareFusion Corporation or one of its subsidiaries.

Chapter 15 Page 649: © Mick Tsikas/Reuters/Corbis; p. 652: Scott Bauer/USDA; p. 654: Danish Siddiqui/Reuters/Landov; p. 665: © Jim Hansen Photography; p. 671: Mike Kane/ Bloomberg via Getty Images; p. 674: Steven Puetzer / Getty Images RF; p. 680: Mark Richards/PhotoEdit.

Chapter 16 Page 689: U. Baumgarten via Getty Images; p. 691: Courtesy Rexam PLC; p. 710: Alex Maclean/Getty Images; p. 713: Mark Wilson/Getty Images.

Chapter 17 Page 731: Jamey Stillings; p. 735 (left): Kevin Mazur/ WireImage; p. 735 (right): Matt Kent/Redferns; p. 758: David McNew/Getty Images.

Chapter 18 Page 783: Jeff Greenberg/Photoedit; p. 784: Andreas Solaro/Getty Images; p. 798: Stephen Chernin/Getty Images; p. 811: Beth S. Parks/AP Images.

Chapter 19 Page 823: Jon Feingersh/Getty Images RF.

ste24102_pcredits_877.indd 877ste24102_pcredits_877.indd 877 12/6/13 12:36 PM12/6/13 12:36 PM

Final PDF to printer

878

Abt Electronics, 375 Allen-Bradley, 248 Allied Signal, 391 Amazon, 44–45, 47, 464, 664, 680 American Airlines, 713 American Express, 399 Apple, 47, 55, 246, 344, 349 Arrow Electronics, 384 AT&T, 344, 399

Barnesandnoble.com, 664 Bayer, 340 Bell Atlantic, 26, 344 Bell Telephone Labs, 23, 369 Best Buy, 145 BMW, 270, 340 Boeing, 142, 638, 671 Boston Market, 49 Burger King, 47, 53, 251, 459

Canon, 399 Coach, 47 Coca-Cola, 47, 341 Compaq Computer, 46 Crown Audio, 380 Cummins Engine, 399 CVS, 677

Dell Computers, 49, 152, 246 Deloitte, 345, 654 Digital Equipment Corp., 344 Domino’s Pizza, 47, 631 DuPont, 677

Ernst & Young LLP, 617 EWP Engineering, Inc., 738 Express Mail, 47, 631

Federated Department Stores, 664 FedEx, 47, 631, 664, 665 Fingerhut, 664–665 Firestone Tire & Rubber, 141 Florida Power and Light, 381, 399 Ford Motor Company, 139, 141, 249, 629, 677 Foxconn, 246

Gap, 26, 75 GE Aerospace, 737 General Electric, 391 General Mills, 612, 677 General Motors, 141, 548, 606, 615, 617 Globe Metallurgical, 381 Google, 47

Hershey Foods, 399 Hewlett-Packard, 46, 139, 152, 162, 246, 399 H&M, 26 Hoechst, 340 Home Depot, 75 Honeywell, 391 Humantech Inc., 290 Hyundai Motor Company, 57, 378

IBM, 47, 139, 144, 663, 666

JCPenney, 75 John Deere, 607

Kraft Foods, 145, 146

Leap Technologies, 391–392 Lego, 151 Lexus, 47 L.L. Bean, 386, 399 Lockheed Martin Corporation, 737

Macy’s, 26 Maria’s Market, 148–149 Martin Company, 369 Mattel Inc., 383, 417 McDonald’s, 47, 49, 51, 143, 251, 259, 271, 426, 459 MCI Communications Corp., 344 Mercedes, 340 Microsoft, 44, 187, 368, 731, 762 Milliken & Company, 381 Morton Salt, 242–243 Motorola, 381, 390, 391, 438, 549, 617

NestléUSA, 669 Nike, 44 Nissan, 340 Nordstrom, 47 NUMMI, 606

Omron Electronics, 419 One-Hour Photo, 47

PepsiCo, 47 Pier One, 665 Procter & Gamble, 399, 677 Puma, 28

Rexam, 691

Sherwin-Williams, 138 Siemens, 340 Solectron, 190

Company Index

ste24102_cidx_878-879.indd 878ste24102_cidx_878-879.indd 878 11/26/13 2:05 PM11/26/13 2:05 PM

Final PDF to printer

Company Index 879

Sony, 47 Southwest Airlines, 47 Steelcase, Inc., 136 Stryker Howmedica, 62 Sysco, 652–653

Target, 553 3M, 47, 655 Toshiba, 139 Toyota, 47, 368, 371, 399, 413, 605, 606, 607, 608, 613, 627 Toys “R” Us, 664 Trek Bicycle, 15 TriState Industries, 621

Union Carbide, 26 UPS, 47, 664

Verizon, 44 Vlasic, 140–141 VX Corporation, 500

Walmart, 46, 47, 342, 364, 553, 665 Walt Disney, 44 Wegmans Food Markets, 33–35, 47, 649, 673–674 Wendy’s, 459 Western Electric, 23

Xerox Corporation, 147, 381, 386, 399, 617

Zappos.com, 44 Zara, 26

ste24102_cidx_878-879.indd 879ste24102_cidx_878-879.indd 879 11/26/13 2:05 PM11/26/13 2:05 PM

Final PDF to printer

880

Subject Index

American Society for Quality (ASQ), 12, 368, 369 Analysis

capability, 436–437 cost-profit-volume, 353–354 cost-volume, 202–205 feasibility, 159 financial, 205–206 job, 299–303 methods, 299–303 multiple regression, 106 Pareto, 392, 395 process, 26 sensitivity, 224–225, 841–844 supplier, 667 SWOT, 47 value, 145, 147 waiting line, 206

Analytics, 19 Anderson, David R., 235, 821, 853 Andon, 618 Anticipation stocks, 549 APICS, 12, 556 Applied research, 139 Appointment systems, 712 Appraisal costs, 378 Armony, Mor, 462 Armstrong, Larry, 378 Arrival patterns, 788–789 Assemble-to-order (ATO), 671 Assembly diagram, 497–498 Assembly line, 15 , 22–23, 240, 251 Assembly time chart, 500–501 Assignable variation, 13 , 418 Assignment model, 697– 700 Associative forecasting techniques, 82, 100–106 Associative model, 82 Atkinson, Roy, 368 Attributes, 422, 427 – 429 Audits, of suppliers, 667 Automation

advantages, 245 computer-aided manufacturing (CAM), 247 computer-integrated manufacturing, 248 defined, 245 disadvantages, 246 fixed, 246 flexible, 247–248, 258 location decisions and, 342 numerically controlled (N/C), 247 programmable, 246 robots, 247 in services, 261–262

Autonomation, 607 , 613 Availability, 177– 178 , 188

Note: Boldface entries indicate key terms and the page numbers where they are defined; page numbers followed by n refer to notes.

A-B-C approach, 554– 556 Acar, Yavuc, 133 Acceptance sampling, 258, 412; see also Quality control Accidents, causes of, 295–296 Accounting

costs, 618 forecasting and, 76 function of, 11, 660

Accuracy, in forecasting, 76, 79–82 Activities, 740 –741 Activity-based costing, 618 Activity-on-arrow (AOA), 740– 743 , 744–748 Activity-on-node (AON), 741– 743 , 748–750 Actual output, 188–189 Actual time, 811 Adams, Bob, 299 Additive model, 96–97 Advertising and promotion, 42, 462 Aft, Larry, 324 Aggregate measures, 59 Aggregate planning, 456–493; see also Inventory management

concept of aggregation, 459–460 defined, 457 demand and supply, 461–465 disaggregating the plan, 477 goal of, 457 inputs to, 461, 480 linear programming, 472–474 master scheduling, 459, 477–482, 496–497 mathematical techniques, 472–475 need for, 460 outputs, 480–482 overview of, 460–461 planning levels, 458 in services, 475–477 simulation models, 475 summary of, 483 supply chain, 461 techniques for, 468–475 trial-and-error techniques, 468–472 uneven demand, strategies for meeting, 465–467 variations, 460

Agile manufacturing, 54 Agility, 26– 27 , 54 Algorithm, use in PERT, 744–751 Allison-Koerber, Deborah, 111 Allowance factor, in time studies, 309–310 Allspaw, John, 215 Alpha risk, 421 American Production and Inventory Control

Society (APICS), 12, 556

ste24102_sidx_880-910.indd 880ste24102_sidx_880-910.indd 880 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

Subject Index 881

Break-even point (BEP), 202 Breakdown maintenance, 641 Breakdown programs, 644 Bribery, 342 Brice, Virginia, 91n Bricks and mortar company, 665 Bridger, R. S., 324 Budget control, 757 Budgeting, 10 Buffa, Elwood, 821 Buffers, inventory, 549–550, 670 Bullwhip effect, 670 Burrows, Robert P., 492 Business organizations

functions within, 4, 10–11 trends, 24–27

Business plan, 459 Business process management (BPM), 13 Business processes, 12–14 Business-to-business (B2B) commerce, 665–666 Butman, John, 408 Byrne, Robert F., 133

C-chart, 429– 430 C-kanban, 621 CAD, 160–161, 762 Caldwell, Philip, 608 Calkins, Patricia, 147 CAM, 247 Camm, Jeffrey D., 235, 821, 853 Capability analysis, 436–437 Capability index, 437– 438 Capacity, 13 , 185 Capacity buffers, 761 Capacity chunks, 198 Capacity costs, 785–786 Capacity cushion, 192 Capacity disposal strategies, 207 Capacity planning, 184–215; see also Aggregate planning

airline industry, 14 constraint management, 201, 810–811 cost-volume analysis, 202–205 defining and measuring, 188–189 determining requirements, 193–194 developing strategies, 196–200 evaluating alternatives, 201–206 factors affecting, 189–191 forecasting, 192–194 goal of, 185 importance of, 187 long term, 193, 194 make or buy, 195–196 planning service capacity, 194–195 rough-cut, 479 short term, 193 steps in the process, 192 strategy formulation, 191–192 volatility of demand, 194–195

Capacity requirements planning, 513– 516 Capacity utilization, 189 Capital productivity, 58

Available-to-promise (ATP) inventory, 480 Average, moving, 86–89, 98 Averaging techniques, 86–91 Avoidance, 680 Awad, Elias M., 302 Awards, for quality, 370, 380–381

Baatz, E., 518 Bacal, Robert, 293n Back orders, 462 Back-shore, 654 Backflushing, 510 Backward scheduling, 695 Balance delay, 265 Balanced Scorecard (BSC), 54–56 Balanced systems, 614–615 Balancing transactions, 625 Baldrige, Malcolm, 381 Baldrige Award, 377 , 381 Balking, 789 Ballou, Ronald H., 364 Bar coding, 441, 552–553 Bartlett, Christopher A., 51n Basic research, 139 Batch processing, 239 Bateman, Nicola, 639 Behavioral approach

to job design, 291 to project management, 733–738

Behavioral school, 289 Benchmarking, 386 , 399 –400 Benton, W. C., 687 Berry, Julie, 598 Berry, Leonard L., 373n, 374n Berry, William L., 215, 492, 544, 608, 639, 728 Best practices, of design, 137–138 Besterfield, Dale H., 408, 454 Besterfield, Glen, 408 Besterfield-Micha, Carol, 408 Besterfield-Sacre, Mary, 408 Beta distribution, 751 Bias, 108, 431 – 432 Bill of materials (BOM), 497– 500 , 510 Billington, C., 681n Binding constraints, 837 Black, Cherie, 632 Black belts, 390 Blanchard, David, 687 Blanket purchase orders, 662 Blueprint, for services, 164–165 BOM, 497–500, 510 Bonomo, Charles, 133 Bonus, 297 Bottleneck operation, 197– 198 , 206, 269, 710–711 Bounded rationality, 218 Bowen, H. Kent, 639 Bowersox, Donald J., 687 Bowie, Norman E., 38 Brainstorming, 398 Branding, 7 Brassard, Michael, 408

ste24102_sidx_880-910.indd 881ste24102_sidx_880-910.indd 881 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

882 Subject Index

Changes, 508 Channel, 787 Chase demand strategy, 465– 467 Chatfield, Carl, 781 Cheaper by the Dozen, 23 Check sheet, 392 Chi-square goodness-of-fit test, 788 Chopra, Sunil, 687 CIM, 248 Classification systems, 554–556 Click and brick companies, 665, 679 Clicks-and-mortar, 679 Climate, impact on location decisions, 347 Closed-loop MRP, 512 Closed-loop supply chain, 681 Closeness ratings, 273–274 Closs, David J., 687 Clustering, 351 Coburn, Larry, 380 Collaborative planning, forecasting,

and replenishment (CPFR), 669 Column reduction, 697 Combination layouts, 255 Common Good Principle, 29 Common variability, 417 Community factors, in location decisions, 347–348 Compensation, 296–299 Competition, time-based, 459 Competitive edge, 46 Competitiveness, 42– 43 Component commonality, 162 Computer-aided design (CAD), 160– 161 , 762 Computer-aided manufacturing (CAM), 247 Computer applications

CAD, 160–161, 762 CIM, 248 e-business, 24–25, 31, 663–666 e-commerce, 24, 521 e-procurement, 24, 666 EDI, 666 ERP, 516–523, 629 for forecasting, 112 GIS, 350–351 linear programming, 838–841

Computer-integrated manufacturing (CIM), 248 Computer viruses, 61 Computerized numerical control (CNC), 247 Computing algorithm, 744–751 Concurrent engineering, 160, 610 Condit, Donald, 598 Conformance, quality of, 375–376 Constant lead time, 574 Constant service time, 794–795 Constant work-in-process (CONWIP), 623–624 Constrained optimization, 823 Constraint management, 201, 810–811 Constraints

binding, 837 categories of, 201 defined, 201, 824 plotting, 828–831

Carbon footprint, 27, 244 Carbone, James, 666 Carrying costs, 553, 557–561 Cascio, Wayne, 324 Cases

An American Tragedy: How a Good Company Died, 66–67 Big Bank, 819 B&L Inc., 686–687 The Case of the Mexican Crazy Quilt, 779–780 Chick-n-Gravy Dinner Line, 405–406 Custom Cabinets, Inc©, 852–853 DMD Enterprises, 541 Eight Glasses a Day (EGAD), 492 Farmers Restaurant, 599 Grill Rite, 598 Harvey Industries, 596–598 Hazel, 37–38 Hazel Revisited, 69 Hello, Walmart?, 364 Hi-Ho Yo-Yo, Inc., 728 Highline Financial Services, Ltd., 133 Home-Style Cookies, 67–68 Level Operations, 637 Making Hotplates, 323 MasterTag, 685–686 M&L Manufacturing, 132 Outsourcing of Hospital Services, 215 Product Recall, 335 Promotional Novelties, 540 Son, Ltd., 851 Tiger Tools, 454 Time, Please, 781 Tip Top Markets, 406–407 Toys, Inc., 453 UPD Manufacturing, 596 “Your Garden Gloves,” 69

Cash flow, 205 Causal variables, 82 Cause-and-effect diagrams, 371 , 396 –397 Cecere, Lora, 492 Cell, 256 Cellular layouts, 256–258; see also Facilities layout Cellular production, 256 Center of gravity method, 356– 358 Centered moving average, 98 Central limit theorem, 418 Central tendency, 422 Centralized distribution, 339 Centralized inspection, 416–417 Centralized inventory management, 669 Centralized purchasing, 662 Certainty, 218– 219 Certification

of employees, 12 of project managers, 738 of quality, 381–383 of suppliers, 624, 668

Chalice, Robert, 639 Change, technological, 48, 60 Change transactions, 626 Changeover time, 53, 612–613

ste24102_sidx_880-910.indd 882ste24102_sidx_880-910.indd 882 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

Subject Index 883

ordering, 554, 557–561 overhead, 618 prevention, 379 processing, 200 quality, 371, 378–380, 440 rework, 380 setup, 554, 692 shortage, 554, 576 total, 353–354 transportation, 272–273, 340, 341, 343, 345, 346, 682 variable, 202, 353–354

Council of Supply Chain Management Professionals, 12 Council on Competitiveness, 345 Counting systems, for inventory, 551–553 Country identification, location decisions and, 345–346 Cox, Jeff, 728 C p , 437–439 CPFR, 669 C pk , 439 CPM (Critical path method), 19, 740– 743; see also PERT

(Program evaluation and review technique) CR (critical ratio), 700 Cradle-to-grave assessment, 144 Craft production, 21 Crandall, Robert L., 713, 716 Crash

defined, 758 project management and, 757–760

Creeping featurism, 143 Critical activities, 741 Critical chain project management (CCPM), 761 Critical path, 741 Critical path method (CPM), 19, 740–743 Critical ratio (CR), 700 Crosby, Philip B., 371, 379 Cross-docking, 581 , 682 Cross training, 270, 617 CRP, 513–516 Culture, impact on design, 143 Cumulative lead time, 497 Currency, 346 Customer satisfaction, 26, 385, 550 Customization

degree of, 20 mass, 151–153, 240

Cycle, 84– 85 , 100, 431 Cycle counting, 556 Cycle stock, 557 Cycle time, 263– 264 , 623 Cyclical scheduling, 714–715

Danner, David L., 324 Darnell, Michele, 140 Databases, 49–50 Davis, Mark M., 170 Davis, Stanley B., 408 De Meirleir, Marcel, 364 DeCarlo, Neil, 408 Decentralized distribution, 339 Decentralized inventory management, 670

Constraints—Cont. redundant, 834–835 theory of, 710–711

Construction costs, 200 Consumer price index (CPI), 104 Consumer surveys, used to forecast, 83 Consumer’s risk, 422 Continuous improvement, 385, 617–618; see also Quality Continuous processing, 240 Continuous review system, 551 Continuous stocking levels, 577–578 Contractors, independent, 464 Contracts, long term, 668 Contribution margin, 202 Control, 5, 16 Control charts

attributes, 422, 427–429 defined, 106, 396, 420 errors, 421–422 forecasting and, 106–110 mean, 422–424 nonrandom patterns, 431 process, 419–422 range, 424–427 run tests, 431–435 for variables, 422–427 when to use, 430–431

Control limits, 420 –421, 435 Control process, 419–422 Conversion process, 5–6 Conveyance kanban, 621 Convis, Gary, 639 CONWIP, 623–624 Cooper, M. Bixby, 687 Corbett, James J., 653n Core competencies, 46 Corner points, 835 Corrective action, 5 Correlation, 104 Cost accounting, 618 Cost analysis, 799–801 Cost-profit-volume analysis, 353–354 Cost reduction, 42 Cost-volume analysis, 202–205 Costs

activity based, 618 appraisal, 378 capacity, 785–786 carrying, 553, 557–561 construction, 200 distribution, 200 ERP, 519–520 excess, 576 failure, 379 fixed, 195, 200, 202, 353–354 holding, 553, 677 inspection, 413 maintenance, 641 of nonconformance, 371 opportunity, 462

ste24102_sidx_880-910.indd 883ste24102_sidx_880-910.indd 883 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

884 Subject Index

computer-aided design, 160–161, 762 concurrent engineering, 160, 610 cultural issues, 143 degree of newness, 155 elements of, 610–611 ethical issues, 141–142 global, 143–144 human factors, 142–143 idea generation, 139 Kano model, 158–159 legal issues, 141–142 life cycles; see Life cycles mass customization, 151–153 phases, 149–150, 159 production, 160–162 production requirements, 161–162 products versus services, 163–164 quality, 375–376 quality function deployment, 155–157 reasons for, 137 recycling, 146–149 redesign, 137–138 reliability, 153–154 remanufacturing, 145–146 research and development, 139 reverse engineering, 139 robust design, 154 services, 162–166 standardization, 61, 151, 610 sustainability, 144–149 technology changes, 137 value analysis, 145, 147

Design and engineering function, 661 Design capacity, 188– 189 Design for assembly (DFA), 162 Design for disassembly (DFD), 146 Design for manufacture and assembly (DFMA), 137 Design for manufacturing (DFM), 162 Design for recycling (DFR), 147 Design of experiments, 154 Design review, 159 Deterministic, 743– 744 Dettmer, H. William, 201n Dewhurst, Nicholas P., 137–138 Differentiation

delayed, 152, 682 as a strategy, 44

Diffusion models, 91 Dimensions of quality, 372–374 Direct numerical control (DNC), 247 Disaggregation, 477 Discounts, quantity, 550, 564–568 Discrete stocking levels, 578–580 Diseconomies of scale, 199– 200 Disintermediation, 682 Distribution, centralized versus decentralized, 339 Distribution costs, 200 Distribution decisions, 33 Distribution function, 16 Distribution requirements planning (DRP), 515– 516

Decentralized purchasing, 662 Decision making

capacity planning; see Capacity planning causes of poor, 217–218 under certainty, 218–219 decision areas, 52 decision trees, 221–223 design and operating decisions, 15–16, 32 establishing priorities, 20 ethics and, 29–30 expected value of perfect information, 223–224 hierarchical organizations, 45 location, 33 models, 18–19, 23 quantitative approaches, 19, 23 under risk, 220–221 sensitivity analysis, 224–225, 841–844 strategic, 32 systems approach, 20 trade-offs, 19 under uncertainty, 218–220

Decision Sciences Institute, 12 Decision table, 579 Decision theory, 206, 216–217, 712; see also Decision making Decision trees, 221– 223 Decision variables, 824– 825 Decline phase, 149–150, 197 Decoupling, 549–550 Defects, zero, 369, 371 Define, measure, analyze, improve, and control (DMAIC), 390–391 Delayed differentiation, 152, 682 Delivery time, 53 Dell, Michael, 50 Delphi method, 83– 84 Demand

aggregate planning, 461–465 common patterns, 192 dependent, 495 fluctuations in, 198–199 forecasting of, 553 independent, 495 lumpy, 681–682 meeting uneven, 465–467 new, 463 seasonal, 193, 198–199 variations in, 460 volatility of, 194–195

Demand chain, 651 Demand fence, 513 Deming, W. Edwards, 24, 368, 370, 381 Deming Prize, 370, 381 Deming wheel, 388 Dependent demand, 495 Depth skills, 299 Design, of products and services, 134–170

activities and responsibilities, 136 availability, 188 best practices, 137–138 capacity; see Capacity planning component commonality, 162

ste24102_sidx_880-910.indd 884ste24102_sidx_880-910.indd 884 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

Subject Index 885

Environmental scanning, 47 –48 EOQ; see Economic order quantity (EOQ) Eppinger, Steven D., 170 Equivalent current value, 206 Equivalent interest rate, 206 Ergonomics, 293– 294 Erlang, A. K., 784 ERP, 516–523, 629 Error, 80– 82 , 106–110, 421–422 Esain, Ann, 639 Ethical framework, 30 Ethics

codes for, 29 decision making, 29–30 defined, 29 design issues, 141–142 global, 342 location decisions and, 348 project management, 736–737 purchasing, 662–663 quality, 380 and supply chains, 657 working conditions, 296

Ethisphere Institute, 30 European Quality Award, 381 Evans, James R., 373n Event-response capability, 655 Events, 741 Exception reports, 508 Excess capacity, 13 Excess cost, 576 Exchange rate risks, 346 Executive opinions, used to forecast, 83 Expand-early strategy, 207 Expected monetary value (EMV) criterion, 220– 221 Expected value of perfect information (EVPI), 223– 224 Experiments, design of, 154 Explanatory variables, 82 Explicit services, 162 Exponential service time, 793–794 Exponential smoothing, 89– 91 Exporting, 658 External failures, 379 Eyring, Veronika, 653n

Fabrication, 15 Facilities layout; see also Process selection and design

capacity, 190 cellular layouts, 256–258 combination layouts, 255 fixed position, 254–255 flexible-manufacturing systems, 248, 258 information requirements, 272 line balancing

cycle time, 263–264 defined, 262 flow systems, 691–692 guidelines for, 266–267 JIT, 614–615 mixed model line, 270 parallel workstations, 269–270

Division of labor, 23 DMAIC, 390–391 Dodge, H. F., 23, 369 Double smoothing, 95 Downsizing, 26 DRP, 515 Drum-buffer-rope technique, 710 Due date, rule for sequencing, 700 Dummy activity, 742 Dunn, Brian, 145 Dynamic line balancing, 270

E-business, 24– 25 , 31, 663 –666 E-commerce, 24, 521 E-procurement, 24, 666 Earliest due date (EDD), 700 Ease of use, 376 Economic indicators, 103–104 Economic lot sizes, 550 Economic order quantity (EOQ)

basic model, 557–561 defined, 557 economic production quantity, 561–564 fixed-order-interval model, 573–576 in MRP, 509 quantity discounts, 550, 564–568 reorder points, 569–573 single-period model, 576–580 versus small lot sizes, 611–612

Economic production quantity (EPQ), 561–564 Economies of scale, 21 , 199 –200 EDD (earliest due date), 700 EDI, 666 Effective capacity, 188– 189 Efficiency, 20, 62, 189 Efficiency school, 289 Eidam, Michael, 378 80/20 rule, 395 El-Haik, Basem, 408, 639 Electronic commerce, 24, 521 Electronic data interchange (EDI), 666 Electronic junk, 145 Emerson, Harrington, 22 Employment, 8, 16–17 Empowerment, 386, 399 End-of-life (EOL) programs, 144 Energy productivity, 58 Engineer-to-order (ETO), 671 Engineering

concurrent, 160, 610 reverse, 139

Engineering changes, 611, 626 Enterprise resource planning (ERP), 516– 523, 629, 656–657; see

also Material requirements planning (MRP) Enumeration approach, 835 Environment

end-of-life programs, 144 ISO 14000, 144, 382 recycling, 146–149 sustainability, 28–29, 46, 144–149, 244, 653

Environmental Protection Agency, 141

ste24102_sidx_880-910.indd 885ste24102_sidx_880-910.indd 885 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

886 Subject Index

Following capacity strategy, 191 Food and Agricultural Organization (FAO), 29 Food and Drug Administration, 141 Foolproofing, 385 Ford, Henry, 22–23, 607 Forecasting, 74 – 133

accuracy of, 76, 79–82 airline industry, 14 approaches to, 82, 115 associative techniques, 82, 100–106 capacity requirements, 192–194 choosing a technique, 110–111 common features, 77–78 computers in, 112 defined, 75 Delphi method, 83–84 demand, 553 diffusion models, 91 elements of good, 78 errors, 80–82, 106–110 focus, 91 formulas used in, 115–116 importance of, 75 monitoring, 106–110 qualitative methods, 82–84 quantitative methods, 82 steps in the process, 79 supply chain, 78–79 technology, 84 time series data, based on

averaging, 86–91, 98–100 cycles, 84–85, 100 defined, 82 exponential smoothing, 89–91 irregular variations, 84–85 naive method, 84–85 random variations, 84–85 seasonality, 84–85, 95–100, 193, 198–199 trend, 84–85, 91–94 trend-adjusted exponential smoothing, 95

uses of data, 76–77 using information, 112

Foreign locations, 340–342; see also International business Foroohar, Rana, 17 Forward scheduling, 695 Foster, Nicole, 685 14 Toyota Way Principles, 384 Francis, Richard L., 287 Freivalds, Andris, 324 Friedman, Norm, 215 From-to charts, 272 Frozen, 479, 513 Fulfillment, of orders, 671–672 Functional strategies, 45

Gantt, Henry, 22, 693 Gantt charts, 22 , 693 –694, 739–740 Gardner, Everette S. Jr., 133 Garvin, David A., 372n, 408 Gatekeeping, 680 Gauging systems, 21

precedence diagram, 264, 740–743 measuring effectiveness, 271–272 need for planning, 250 objectives of, 250 problems with poor, 250 process layouts, 253–254, 271–275 product layouts, 250–253, 262–270 service layouts, 258–262 transportation issues, 272–273 u-shaped layouts, 252–253

Facilities location; see Location planning Factor rating, 355– 356 Fail-safing, 385, 616 Failure, 153, 379 Failure costs, 379 Fairness Principle, 29 Fazel, Farzaneh, 387n FCFS (first come, first served), 700, 789–790 Feasibility, range of, 843 Feasibility analysis, 159 Feasible solution space, 824– 826 , 831 Federal Reserve Board, 103 Feedback, 5, 16 Feeding buffers, 761 Feigenbaum, Armand, 371 Fences, time, 479 Fill rate, 573, 679 Finance function, 4, 10, 76 Financial analysis, 205–206 Finite element analysis (FEA), 161 Finite loading, 695 Finite-source situation

defined, 786 queuing models, 805–810

Finucane, James, 344 First come, first served rule, 700, 789–790 Fishbone diagram, 371, 396 Fitness, 141 Fitness-for-use, 370, 372 Fitzgerald, Kevin R., 659 Fitzsimmons, James A., 38, 162n, 170 Fitzsimmons, Mona J., 38, 162n, 170 Five forces model, 48 5W2H approach, 628 Fixed automation, 246 Fixed costs, 195, 200, 202, 353–354 Fixed-order-interval model, 573– 576 Fixed-period ordering, 509–510 Fixed-position layout, 254– 255; see also Facilities layout Flattening, of the organization, 26–27 Flexibility, 42, 196, 207 Flexible manufacturing system (FMS), 248, 258 Flexible system, 609, 614 Flow management, 652 Flow process chart, 301– 302 Flow-shop scheduling, 690– 692 Flow system, 690– 692 Flowchart, 392 Flynn, Anna E., 687 FMS, 248, 258 Focus forecasting, 91

ste24102_sidx_880-910.indd 886ste24102_sidx_880-910.indd 886 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

Subject Index 887

Group technology, 257– 258 , 613 Growth phase, 149–150, 196–197 Growth strategies, 49 Guide, V. Daniel, 687 Guinipero, Larry, 687 Gunther, Neil J., 215 Gupta, Praveen, 408 Gygi, Craig, 408

Hackett, Gregory P., 492 Hall, Robert W., 646 Hammer, Michael, 73 Handfield, Robert B., 687 Hanke, John, 133 Hard data, 82 Hariharn, Arun, 639 Harrington, Jim, 408 Harris, F. W., 23 Heagney, Joseph, 781 Hedging, 550 Heijunka, 607 Heineke, Janelle, 170 Heldman, Kim, 781 Hertzberg, Frederick, 23 Heuristic rule, 264 Hierarchical organizations, 45–46 High technology, 25, 245; see also Technology High volume systems, scheduling in, 690–692 Hill, Terry, 73 Hillier, Frederick S., 821, 853 Hillier, Mark S., 821, 853 Hiring, of workers, 463 Histogram, 392 Hoerl, Roger W., 408 Holding costs, 553, 677 Holland, Max, 66 Hopp, Wallace J., 133, 544, 603, 639, 728 Horine, Gregory M., 781 Horizontal loading, 291 Horizontal skills, 299 Hospital layouts, 261 Hourly based pay systems, 296 House of quality, 156–157 Housekeeping, 626 Howe, Tom, 415–416 Howley, Lauraine, 62 Human relations movement, 23 Human resources, 11, 77; see also Personnel issues Hungarian method, 697– 700 Huse, Edgar F., 323

Idle time, 265–266 Ihlwan, Moon, 378 Illumination, working conditions and, 294–295 Imai, Masaaki, 610n Implicit services, 162 Implied warranties, 141 Importing, 658 Incentive plans, 61, 296–299 Independence, 754

General Agreement on Tariffs and Trade (GATT), 25, 340 General-purpose plant strategy, 350 Geographical information system (GIS), 350– 351 Ghoshal, Sumantra, 51n Gilbreth, Frank, 22, 23, 293, 303, 304 Gilbreth, Lillian, 23, 293, 304 Gilmore, James, 170 Gispan, Jonathan, 737–738 Global priority rules, 700 Global product design, 143–144 Global strategy, 50–51 Global supply chains, 25, 31, 656 Global warming, 27, 144, 146 Globalization, 25; see also International business

benefits, 340–341 country identification, 345–346 disadvantages, 341 location decisions, 340–342 risks, 341–342 strategy, 50–51

Go, no-go gauge, 431 Goals

capacity planning, 185 defined, 44 of JIT, 609–610 waiting line management, 785–786

Goetsch, David L., 408 Goldratt, Eliyahu M., 201, 215, 710n, 728, 761, 781 Gonzalez, Adrian, 677 Goods

defined, 3 versus services operations, 7–9, 15

Goods-services continuum, 6 Google, 297 Gorman, Michael E., 170 Grant, Eugene L., 425 Graphical linear programming

defined, 826 feasible solution space, 824–826, 831 minimization, 824, 835–837 objective function, 824–825 objective function coefficient change, 841–842 objective function line, 831–834 plotting constraints, 828–831 procedures, 826–828 redundant constraints, 834–835 slack and surplus, 837–838 solutions and corner points, 835

Graphs, used in aggregate planning, 468–472 Gravity method, center of, 356–358 Gray, Clifford F., 734, 763 Green, Erin H., 653n Green belts, 390 Green initiatives, 28 Griebenow, Allan, 676 Griffin, W., 821 Grimshaw, David J., 364 Groover, Mikell P., 170, 258, 270n, 287, 324 Gross requirements, 501– 502 Group incentive plans, 298

ste24102_sidx_880-910.indd 887ste24102_sidx_880-910.indd 887 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

888 Subject Index

pipeline, 550 turnover of, 551 vendor-managed, 633, 670–671 work-in process, 548, 615, 623–624

Inventory management, 546–603 ABC approach, 554–556 bar coding, 441, 552–553 bullwhip effect, 670 carrying costs, 553, 557–561 centralized, 670 counting systems, 551–553 cycle counting, 556 demand forecasts, 553 economic order quantity (EOQ)

basic model, 557–561 defined, 557 economic production quantity, 561–564 fixed-order-interval model, 573–576 in MRP, 509 quantity discounts, 550, 564–568 reorder points, 569–573 single-period model, 576–580 versus small lot sizes, 611–612

80/20 rule, 395 formulas, 582 importance of, 32, 548–549 lead time information, 553, 574 lean operations, 615–616 objectives of, 550–551 ordering costs, 554, 557–561 perpetual system, 551–552, 569 requirements for effective, 551–556 RFID, 553, 674–676 safety stock, 508–509, 550, 557, 569–570 service levels, 570 stocking levels, 577–580 stockouts, 550, 569–570 two-bin system, 552, 623

Inventory models, 19 Inventory records, 500 Inventory turnover, 551 Inventory velocity, 670 Irregular variation, 84– 85 Ishikawa, Kaoru, 371 Ishikawa diagram, 396 ISO 9000, 381 –382, 668 ISO 9001, 738 ISO 14000, 144 , 382 ISO 24700, 382

Jaber, Mohamed Y., 335 Jacobs, F. Robert, 215, 492, 544, 639, 728 Japanese manufacturers, influence of, 24 Japp, Len, Jr., 416 Jidoka, 607, 613 Jimenez, Alicia, 416 JIT, 348, 605, 628 JIT II, 633 Job analysis, 299–303 Job descriptions, 12

Independent contractors, 464 Independent demand, 495 Independent events, 172 Indexes, 97, 103–104 Indicators, economic, 103–104 Indifference point, 203 Individual incentive plans, 297 Industrial engineering function, 16 Industrial Revolution, 21, 368 Infinite loading, 695 Infinite source models

basic relationships, 791–793 four models, 790–791 multiple priorities, 802–805 multiple servers, 795–799 single server, 793–795

Infinite source situation, 786 Information technology, 25; see also Technology Information velocity, 679 Innovating, 27 Innovation, technological, 244 Input/output (I/O) control, 696– 697 Inputs

aggregate planning, 461, 480 MRP, 497–500 operations management, 5–7

Inspection, 258, 412– 417; see also Quality control Institute for Operations Research and the

Management Sciences, 12 Institute for Supply Management (ISM), 12 Institute of Industrial Engineers, 12 Interchangeable parts, 22, 151 Intermediate plans, 458–459 Intermediate-volume systems, scheduling in, 692–693 Intermittent processing, 253 Internal failures, 379 Internal rate of return (IRR), 206 International business; see also Globalization

country identification, 345–346 design issues, 143–144 GATT, 25, 340 global strategy, 50–51 location decisions, 340–342 NAFTA, 25, 340 trade agreements, 340

International Ergonomics Association, 293 International Organization for Standardization, 381–383 Internet; see also Technology

benefits of, 61 clicks-or-bricks model, 665, 679 e-business, 24–25, 31, 663–666 e-commerce, 24, 521 e-procurement, 24, 666

Introduction phase, 196 Intuitive rules, 264 Inventory

available-to-promise, 480 defined, 547 finished goods, 463–464 functions of, 549–550

ste24102_sidx_880-910.indd 888ste24102_sidx_880-910.indd 888 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

Subject Index 889

Layout of facilities; see Facilities layout Lead time

constant, 574 cumulative, 497 defined, 10, 553 stacked, 497

Leadership, 618 Leading capacity strategy, 191 Leading variable, 100 Lean operations, 604 – 639

benefits and risks of, 581, 607 characteristics of, 606 defined, 605 ERP, 516–523, 629 inventory control, 615–616 JIT, 348, 605, 628 JIT II, 633 kanban, 607, 621–623 level loading, 619–620 limited work-in-process, 623–624 line balancing; see Line balancing lot sizes; see Lot sizing manufacturing cells, 613 manufacturing planning and control, 618–626 versus MRP, 622–623 obstacles, 629–630 overview of, 634 personnel/organizational elements, 616–618 preventive maintenance, 251, 626, 641–644 process design, 611–616 product design, 610–611 production flexibility, 614 pull systems, 620–621 quality improvement, 613 services, 630–633 setup time reduction, 612–613, 692 six sigma, 26, 390–392, 438, 628, 761 supporting goals, 609–610 Toyota approach, 607–609 versus traditional, 626 transitioning to, 629–630 value stream mapping, 627–628 vendor relationships, 624–625 visual systems, 621–623

Lean process design, 244 Lean production, 26–27, 291 Lean supply chains, 659 Lean systems, 26– 27 Learning curves

applications of, 329–330 concept of, 325–329 limitations of, 331–332

Least squares line, 101 Leavenworth, Richard, 425 Lee, Hau L., 681n, 687 Leenders, Michiel R., 687 Legal function, 11 Legal issues

design of products/services, 141–142 product liability, 141, 377

Job design, 289–294; see also Work design behavioral approaches, 291 compensation, 296–299 defined, 289 ergonomics, 293–294 human relations movement, 23 methods analysis, 299–303 motion study, 22, 303–305 motivation, 23, 291–292 specialization, 290–291 teams, 292–293 working conditions, 294–296

Job enlargement, 291 Job enrichment, 291 Job flow time, 701 Job lateness, 701 Job rotation, 291 Job shop, 238–239 Job shop scheduling

defined, 693 loading, 693–700 sequence dependent setup times, 709 sequencing, 700–706 two work centers, sequencing through, 707–709

Job splitting, 707 Job time, 700 Jockeying, 789 Johnson, P. Fraser, 687 Johnson, S. M., 707n Johnson, Timothy D., 781 Johnson’s rule, 707 Jones, Daniel T., 38, 606, 639 Judgmental forecasts, 82 Juran, Joseph M., 24, 370–371, 379 Just-in-time (JIT), 348, 605, 628; see also Lean Operations

Kaizen, 371 , 385, 607, 610 Kaminsky, Philip, 664, 687 Kanban, 607, 621– 623 Kano, Noriaki, 158 Kano model, 158–159 Kaplan, Robert, 54n Kasibhatla, Prasad, 653n Keating, Barry, 133 Kelly, John, 143 Kenney, Brad, 368, 380 Kiley, David, 374 Knod, Edward M., Jr., 614 Knowledge-based pay, 296 , 299 Koch, Christopher, 518, 521 Kowalski, Bill, 391–392

La Piana, David, 215 Labor factors, impact on location decisions, 345, 347 Labor productivity, 58 Labor turnover, 61 Laplace, 219 Larson, Erik W., 734, 763 Lauer, Axel, 653n Layoffs, 61, 463

ste24102_sidx_880-910.indd 889ste24102_sidx_880-910.indd 889 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

890 Subject Index

evaluating location alternatives center of gravity method, 356–358 factor rating, 355–356 locational cost-profit-volume analysis, 353–354 transportation model, 354–355, 472–474

factors affecting community considerations, 347–348 multiple plant, 349–350 regional, 346–347 site-related factors, 348–349

global locations, 340–342 importance of, 42, 338 location options, 339–340 objectives of, 339 procedures for, 342–343 service and retail locations, 351–352 supply chain considerations, 339

Locational cost-profit-volume analysis, 353– 354 Logistical transactions, 625 Logistics, 650, 672– 678; see also Transportation Long-range plans, 458 Long-term capacity needs, 193, 194 Long-term contracts, 668 Long-term forecasts, 76 Lot-for-lot ordering, 502–505, 509 Lot sizing

economic, 550 versus EOQ, 611–612 large versus small, 681–682 MRP, 509–510 small, 611–612

Love, Stephen, 514 Lovelock, Christopher H., 170 Low cost strategies, 44 Low-level coding, 500 Low-volume system

loading, 693–700 sequence dependent setup times, 709 sequencing, 700–706 two work centers, sequencing through, 707–709

Lower control limits (LCL), 107, 421 Lubbers, Sarah, 599 Lumpy demand, 681–682

M/D/1, 794–795 M/M/1, 793–794 M/M/S, 795–799 MacDonald, Jim, 138 Machine productivity, 58 Machine shop, 253 MAD, 81–82 Maintenance

breakdown, 641 costs, 641 defined, 640 predictive, 643 preventive, 251, 626, 641–644 replacement, 644–645 responsibility of, 16 total productive, 643

UCC, 141 warranties, 141

Level capacity strategy, 465– 467 Level loading, 619–620 Lewis, Michael, 73 Liability, 141, 377 Liebhaber, Richard, 344 Life cycle analysis, 144 Life cycles

decline phase, 149–150, 197 growth phase, 196–197 introductory phase, 196 maturity phase, 149–150, 197 product, 240 project, 732–734

Liker, Jeffrey K, 384n, 639 Limited work-in-process, 623–624 Lindsay, W. M., 373n Line balancing

cycle time, 263–264, 623 defined, 262 flow systems, 691–692 guidelines for, 266–267 mixed model line, 270 parallel workstations, 269–270 precedence diagram, 264, 740–743 takt time and, 614–615

Linear programming, 822–853 aggregate planning, 472–474 assignment method, 697–700 components, 824 computer solutions, 838–841 graphical linear programming

defined, 826 feasible solution space, 824–826, 831 minimization, 824, 835–837 objective function, 824–825 objective function coefficient change, 841–842 objective function line, 831–834 plotting constraints, 828–831 procedures, 826–828 redundant constraints, 834–835 slack and surplus, 837–838 solutions and corner points, 835

models, 824–826 sensitivity analysis, 841–844 simplex method, 838 transportation model, 354–355, 472–474 uses for, 19

Linear regression, simple, 101–105 Linear trend equation, 92 Liquid, 479 Little’s Law, 550, 623 , 791 Load charts, 694 Load reports, 514– 515 Loading, 693– 700 Local priority rules, 700 Location planning, 336–365

decision making, 33 ethics and, 348

ste24102_sidx_880-910.indd 890ste24102_sidx_880-910.indd 890 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

Subject Index 891

bill of materials, 497–500, 510 capacity requirements planning, 513–516 closed loop, 512 defined, 495 DRP, 515–516 ERP, 516–523, 629 inputs, 497–500 inventory records, 500 versus kanban, 622–623 lot sizing, 509–510 master schedule, 459, 477–482, 496–497 MRP II, 511–512 outputs, 507–508 overview of, 495–496 processing, 500–507 safety stock, 508–509, 550, 569–570 in services, 510 updating the system, 505–507

Materials handling, 254 Mathematical decision making models, 18, 23 Mathematical techniques, for aggregate planning, 472–475 Mather, D., 646 Mathews, Anna Wilde, 819–820 Matrix organization, 734 Maturity stage, 149–150, 197 Maximax, 219 Maximin, 219 Maximum line length, 801 Mayo, Elton, 23 McGinnis, Leon F., Jr., 287 McGregor, Douglas, 23 McNulty, Steven, 140–141 Mean, 13 Mean absolute deviation (MAD), 81– 82 Mean absolute percent error (MAPE), 81– 82 Mean control charts, 422– 424 Mean squared error (MSE), 81– 82 Mean time between failures (MTBF), 173– 177 Measured daywork systems, 296 Measurement, of capacity, 188–189 Meczkowski, Frank, 140 Meeker, David G., 137 Meidl, Peter, 687 Mentzer, John T., 364 Merchantability, 141 Mergers and acquisitions, 46 Methods analysis, 299– 303 Methods Engineering Council, 311 Methods-time measurement (MTM), 311 Meyers, Fred E., 287, 324 Microfactory, 348 Micromotion study, 304 Miller, Jeffrey G., 625n Mills, Karen, 612 Minimax regret, 219 Minimization, 824, 835–837 MIS, 11, 77 Mission, 44 Mission statement, 44 Mitchell, Mike, 669 Mitchell, William E., 384

Maister, David H., 811 Make or buy, 195–196 Make-to-order (MTO), 671 Make-to-stock (MTS), 671 Makespan, 701 Management compensation, 299 Management information systems (MIS), 11, 77 Management science techniques, 23 Mann, David, 639 Mann, Lawrence, Jr., 646 Manufacturability, 10 , 136, 162 Manufacturing

agile, 54 craft production, 21 employment, 8, 16–17 Japanese influence on, 24 lean; see Lean operations mass production, 22 versus service, 7–9

Manufacturing at Warp Speed, 201 Manufacturing cells, 613 Manufacturing planning and control, 618–626 Manufacturing resources planning (MRP II), 511– 512 Manufacturing systems

assembly lines, 15, 22–23, 240, 251 automation systems, 245–249 cellular, 256–258 computer-aided, 246–247 computer-integrated, 248 designing for, 160–162 flexible, 248, 258 JIT, 348, 605, 628 job shop, 238–239 line balancing; see Line balancing multiple plant location, 349–350 robots, 247 sustainable production, 244

MAPE, 81–82 Mapping, value stream, 627–628 Markels, Alex, 344 Market area plant strategy, 349–350 Market test, 159 Marketing

advertising and promotion, 42 forecasting, 77 function of, 4, 10 influence on competitiveness, 42 order qualifiers/winners, 48

Markets, location decisions and, 346–347 Markula Center for Applied Ethics, 29–30 Martin, R. Kipp, 235 Martin, Skip, 821, 853 Maslow, Abraham, 23 Mass customization, 151 – 153 , 152, 240 Mass production, 22 Massey, Lynn, 639 Master production schedule (MPS), 477, 496 – 497 Master schedule, 459 , 477–482, 496 –497 Material and Information Flow Mapping, 627 Material requirements planning (MRP), 494 – 512

benefits and requirements, 510–511

ste24102_sidx_880-910.indd 891ste24102_sidx_880-910.indd 891 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

892 Subject Index

National Institute of Standards, 377 National Institute of Standards and Technology, 381 Near-sourcing, 659 Negative exponential distribution, 788 Negotiated purchasing, 329 Net-change system, 506 Net requirements, 501– 502 Netting, 502 Network configuration, 659 Network conventions, 742–743 Network (precedence) diagram, 740– 743 Newness, degree of, 155 Newsboy problem, 576 Nichols, Ernest L., Jr., 687 Nichols, Karen, 738 Niebel, Benjamin W., 295, 301, 304, 305, 310, 324 Noise and vibrations, working conditions and, 295 Nolden, Carol, 646 Nonlinear regression analysis, 106 Nonmanufactured goods, 7 Nonrandom patterns, 431 Nonrandom variation, 418 Nonrepetitive processing, 253–254 Normal distribution, 14, 418–419 Normal operating conditions, 153 Normal time, in work measurement, 308–309 North American Free Trade Agreement, 25, 340 Northwest corner, 355 Norton, David, 54n Numerically controlled (N/C) machines, 247

Objective function, 824– 825 , 831–834, 841–842 Objectives

facilities layout, 250 inventory management, 550–551 location decisions, 339 scheduling, 690

Observed time, in work measurement, 308 Occupational Health and Safety Administration, 141 Occupational health care, 295 Occupational Safety and Health Act, 296 Office layouts, 261 Offshoring, 384 Ohno, Taiichi, 371, 605 On-site inspection, 416–417 OPEC, 369 Operational decisions, 16, 32 Operational processes, 12 Operations management

careers in, 11–12 decision making and, 15–16, 17–20, 45 defined, 4 evolution of, 21–24 function, 4, 16, 660 goods versus services, 7–9, 15 influence on competitiveness, 42–43 interface with other functions, 11, 16 Japanese influence on, 24 key issues, 27–33 role of managers, 16 scope of, 14–16

Mitra, Amitava, 454 Mixed model line, 270 Mixed-model sequencing, 619–620 Mobach, Mark P., 287 Models

additive, 96–97 associative, 82 benefits of using, 18 decision making, 18–19, 23 defined, 18 finite source, 805–810 infinite source; see Infinite source models inventory, 19 Kano, 158–159 limitations of, 18–19 linear programming, 824–826 mathematical, 18, 23 multiple-priority, 802–805 multiplicative, 96–97 physical, 18 project, 19 quantitative, 19, 23 schematic, 18 simulation, 475 single-period, 576–580 statistical, 19, 23 transportation, 354–355, 472–474

Modular design, 152– 153 , 610 Monczka, Robert, 687 Monden, Yasuhiro, 639 Monk, Ellen, 544 Montgomery, Douglas C., 454 Most likely time, 751 Motion study, 22 , 303 –305 Motion study principles, 303– 304 Motivation, 23, 291–292 Moving assembly line, 22 Moving average, 86– 89 , 98 MPS, 477, 496–497 MRP; see Material requirements planning (MRP) MRP II, 511–512 MSE, 81–82 Muda, 607 Muller, Max, 603 Multifactor productivity, 57–59 Multiple break-even points, 204 Multiple-channel servers, 787 Multiple plant location strategies, 349–350 Multiple-priority model, 802– 805 Multiple regression analysis, 106 Multiple resources scheduling, 715 Multiple servers, 795–799 Multiple-source purchasing, 624 Multiplicative model, 96–97 Mundel, Marvin E., 324 Muther, Richard, 273n Muther grid, 274

NAFTA, 25, 340 Naive forecasts, 84– 85 National Association of Purchasing Management, 662

ste24102_sidx_880-910.indd 892ste24102_sidx_880-910.indd 892 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

Subject Index 893

Overhead costs, 618 Overtime, 463–464 Ozgur, Ceyhun, 235, 821, 853

P-chart, 427– 429 P-kanban, 621 Packaging, 145–146, 148–149 Papadellis, Randy, 669 Parallel workstations, 269–270 Parameter design, 154 Parameters, 824 Parasuraman, A., 373n, 374n Pareto, Vilfredo, 392 Pareto analysis, 392, 395 Pareto phenomenon, 20 Part families, 256, 257–258 Part-period model, 510 Part time workers, 464 Partial productivity, 57–58 Partnerships, 668–669 Patents, 8 Path, 741 Path probabilities, determining, 754–756 Patterson, James, 687 Pay systems, 296–299 Payback, 206 Payoff table, 217 PDSA, 388–389, 711 Pegging, 505 Perceived time, 811 Performance-control reports, 508 Performance metrics, 19

benchmarking, 386, 399–400 importance of, 678–679 key measures, 679 waiting lines, 790

Periodic maintenance, 642 Periodic orders, 550 Periodic system, 551 Perpetual inventory system, 551– 552 , 569 Personnel issues

hiring, 463 human resources function, 11, 77 independent contractors, 464 job descriptions, 12 layoffs, 61, 463 in lean operations, 616–618 part time workers, 464 salaries/wages, 296–299

PERT (Program evaluation and review technique), 19 , 740 –743, 760–761

Pessimistic time, 751 Pexton, Carolyn, 408 Physical decision making models, 18 Physical inventory count, 551 Piasecki, David J., 603 Pick, James B., 364 Picking system, 259 PIMS, 49–50 Pine, B. Joseph, 170 Pinedo, M., 728

Operations management—Cont. service operations, 7–9 transformation process, 5–7 trends in, 24–27

Operations strategy, 26 , 47, 51 –54 Operations Tour

Boeing, 638 Bruegger’s Bagel Bakery, 600 High Acres Landfill, 170 Morton Salt, 242–243 PSC, Inc., 601–603 Stickley Furniture, 541–544 U.S. Postal Service, 70–72 Wegmans Food Markets, 33–35 Wegmans’ Shipping System, 673–674

Opinions, forecasts based on, 83 Opportunity costs, 462 Opportunity losses, 220 Optimistic time, 751 Optimization, constrained, 823 Order cycles, 550 Order fulfillment, 671– 672 Order qualifiers, 48 Order releases, 508 Order winners, 48 Ordering costs, 554, 557 – 561 Orders

back, 462 duplicate, 462 fixed-period, 509–510 process, 662

Organizational strategies, 44–46, 54 Organizations

accounting function, 11 centralization of, 662 competitiveness and, 42–43 finance function, 4, 10, 76 flattening, 26–27 hierarchical, 45–46 marketing function, 4, 10 matrix, 734 missions of, 44 reasons for failure, 43

OSHA, 296 Ouchi, William, 23 Output

actual, 188–189 examples of, 5–7 master scheduling process, 480–482 MRP, 507–508 tangible, 7

Output-based (incentive) system, 296– 298 Output constraints, 266–267 Outsourcing

defined, 31 of logistics, 677–678 make or buy, 195–196 quality issues, 384 reasons for, 49, 61, 137–138 risks of, 195, 384, 653–654 sustainability and, 28

ste24102_sidx_880-910.indd 893ste24102_sidx_880-910.indd 893 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

894 Subject Index

process types, 238–242 technology, 244–249

Process specifications, 159 Process technology, 25, 245 Process variability, 417 – 418 , 436 Process variation, 13–14 Process yield, 60 Processing costs, 200 Processing time, 53 Procurement, 660–663; see also Purchasing Producer’s risk, 422 Product and service technology, 25 Product bundle, 162 Product design; see Design, of products and services Product layout, 250– 253, 262–270; see also Facilities layout Product liability, 141, 377 Product mix, 194 Product or service profiling, 244 Product packages, 6 Product plant strategy, 349 Product specifications, 159 Product structure tree, 497– 498 Production and Operations Management

Society (POMS), 12 Production flexibility, 614 Production kanban, 621 Production line, 15 , 22–23, 240, 251 Production quantity, 561–564 Production requirements, 161–162 Production systems

craft, 21 lean, 26–27, 291 maintenance of, 640–642 mass, 22

Productivity computing, 57–59 cost and, 42 defined, 56 factors affecting, 60–61 growth, 56 human resources movement, 23 improving, 53, 61–62 measuring, 8 quality and, 378 service sector, 59–60

Professional societies, 11–12 Profiling, product or service, 244 Profit Impact of Market Strategy (PIMS), 49–50 Profits, 7 Program evaluation and review technique

(PERT), 19, 740–743, 760–761 Programmable automation, 246 Project, 241 Project buffer, 761 Project champion, 737 Project life cycle, 732–734 Project management, 730–781; see also Scheduling

behavioral aspects, 733–738 budget control, 757 certification, 738 computing algorithm, 744–751

Pingho, LeRoy, 344 Pinto, J. A., 287 Pipeline inventories, 550 Pipes, Kerry, 352 Pisano, Gary, 17 Plambeck, Erica L., 462 Plan-do-study-act (PDSA) cycle, 388– 389 , 711 Planned-order receipts, 501 –502 Planned-order releases, 502 Planned orders, 508 Planning fence, 513 Planning horizon, 460 Planning reports, 508 Planning time, 53 Plant layout; see Facilities layout Plant locations; see Location planning Plotting constraints, 828–831 Point-of-sale (POS) systems, 552 Poisson distribution, 193, 429–430, 788–789 Poka-yoke, 385 , 616 Population source, 786–787 Porter, Michael, 48n, 73 Postponement, 152 Powell, David, 352 Precedence diagram, 264, 740 – 743 Predetermined time standards, 311– 312 Predictive maintenance, 643 Predictor variables, 101 Present value (PV), 205– 206 Prevention costs, 379 Preventive maintenance, 251 , 626, 641– 644 Pricing

competitiveness and, 42 demand and, 462 hedging, 550 shadow, 842 transfer rules, 345

Primary reports, 508 Principles of Scientific Management, 22 Priorities, establishment of, 20 Priority rules, 700– 701 Probabilistic time estimates, 743, 751 – 753 Probability distribution, 193 Problem solving, 388–392; see also Decision making Process, 12 Process analysis, 26 Process batch, 711 Process capability, 436– 440 Process charts, 301–302 Process control, 412 Process design, 611–616 Process distribution, 418 Process improvement, 26 , 389 –392, 628 Process layouts, 253– 254, 271–275;

see also Facilities layout Process management, 12–14 Process plant strategy, location decisions and, 350 Process selection and design; see also Capacity planning;

Facilities layout automation; see Automation defined, 237–238

ste24102_sidx_880-910.indd 894ste24102_sidx_880-910.indd 894 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

Subject Index 895

dimensions of, 372–374 ethics and, 380 evolution of, 368–369 gurus of, 369–371 ISO, 381–382, 668, 738 problem solving, 388–392 process improvement, 389–392 responsibility for, 376–377 of services, 8, 15, 43, 373–374 supply chain, 383–384 tools

benchmarking, 386, 399–400 brainstorming, 398 cause-and-effect diagrams, 371, 396–397 check sheets, 392 control charts; see Control charts flowcharts, 392 graphical, 397–398 histograms, 392 pareto analysis, 395 quality circles, 371, 398–399 run charts, 397 scatter diagrams, 395–396

zero defects, 369, 371 Quality at the source, 386, 412 , 417, 607 Quality-based strategy, 53 Quality circles, 371 , 398 –399 Quality control, 410 – 455

acceptance sampling, 258, 412 airline industry, 15 autonomation, 613 continuous improvement, 385, 617–618 defined, 411 fail-safing, 385, 616 formulas, 442–443 inspection, 258, 412–417 Kaizen, 371, 385, 607, 610 lean operations and, 609, 611 process capability, 436–440 six sigma, 26, 390–392, 438, 628, 761 statistical process control; see Statistical process control (SPC) TQM, 26, 384–388

Quality function deployment (QFD), 155– 157 Quality of conformance, 375– 376 , 417 Quality of design, 375 Quality of work life, 294–299 Quality transactions, 625 Quantitative approach

to decision making, 19, 23 to forecasting, 82

Quantity discounts, 550 , 564 –568 Queue discipline, 789– 790 Queuing techniques, 19 Queuing theory, 784 Quick response, 42

R-charts, 424–427 Radford, G. S., 368 Radio frequency identification (RFID), 245 , 553, 674 –676 Ragsdale, Cliff T., 821, 853

Project management—Cont. crashing, 757–760 critical chain, 761 determining path probabilities, 754–756 deterministic time estimates, 743–744 ethics of, 736–737 Gantt charts, 22, 693–694, 739–740 key decisions, 735–736 life cycle, 732–734 models, 19 multiple projects, 762 network diagram, 740–743 overview of, 733 PERT and CPM, 19, 740–743, 760–761 probabilistic time estimates, 743, 751–753 project champions, 737 project manager role, 736–737 risk management, 763–764 simulation, 756–757 six sigma, 761 slack time, 463–464, 742, 750 software, 762–763 sources of error, 760–761 virtual teams, 143, 761–762 work breakdown structure, 739

Project Management Institute (PMI), 12, 732, 737, 738 Project management triangle, 736 Project manager, role of, 736–737 Project slippage, 762 Projected on hand, 501– 502 Projects, 732, 734 Promotion, 42, 462 Prototype development, 159 Public relations function, 11 Pull systems, 620– 621 Purchase cost, 553 Purchase orders, blanket, 662 Purchasing

centralized versus decentralized, 662 e-procurement, 24, 666 ethics, 662–663 importance of, 659 interfaces, 661 in a JIT system, 624–625 multiple source, 624 negotiated, 329 responsibility of, 16, 32

Purchasing cycle, 661– 662 Push systems, 620– 621

QFD, 155–157 Qualitative approaches, to forecasting, 82–84 Quality, 366–409; see also Quality control

awards for, 370, 377, 380–381 benefits of good, 377 certification for, 381–383 consequences of poor, 377–378 cost of, 371, 378–380, 440 defined, 367 determinants of, 375–376

ste24102_sidx_880-910.indd 895ste24102_sidx_880-910.indd 895 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

896 Subject Index

Productivity Gains Curb Inflation, 53 Productivity Improvement, 62 Project Managers Have Never Been More Critical, 737–738 Radio Frequency Identification (RFID) Tags, 553 Recycle City: Maria’s Market, 148–149 Rework and Morale, 380 RFID Tags: Keeping the Shelves Stocked, 675 Rise of the 3PL, 677–678 A Safe Hospital Room of the Future, 260 Servicing Passenger Planes, 713 Site Selection Grows Up, 352 The Sounds of Quality, 374 Springdale Farm, 675 Stopped at a Light? Why Not Read This,

You May Have Time, 819–820 The Top ERP Mistakes, 522–523 Toyota Recalls, 608 Universities Embrace Sustainability, 28 Veggie Tales, 652–653 Vlasic on a Roll with Huge Pickle Slices, 140–141 What Keeps Six Sigma Practitioners Up at Night?, 391–392 Whatever Happened to Quality?, 368 Why Manufacturing Matters, 17 Why Productivity Matters, 59 Xerox Diverts Billion Pounds of Waste, 147

Receiving function, 661 Record keeping, 581 Recycling, 146– 149 Reddy, Ram, 114 Redesign of products, 137–138; see also Design,

of products and services Reduce, 145 Reduced transaction processing, 625–626 Redundant constraints, 834– 835 Redundant systems, 764 Reengineering, 638 Regenerative system, 506 Regional factors, location decisions and, 346–347 Regression, 101 Regret (opportunity loss), 220 Reich, Robert, 617 Relative costs, 700 Reliability, 153– 154 , 171 –183 Remanufacturing, 145– 146 Reneging, 789 Reorder point (ROP), 569– 573 Repetitive processing, 240, 250–253 Replacement maintenance, 644–645 Requisition, 661 Research and development (R&D), 139 Reservation systems, 712 Resiliency, 655 Response time, 53, 683 Responsive strategies, 659 Responsiveness, 44 Restaurant layouts, 261 Retail sector

layout, 259 location planning, 351–352

Return on investment (ROI), 548

Rajan, Murli, 400 Random number table, 314– 315 Random variation, 417 Random variations, 13 , 84 –85 Range control chart, 424– 427 Range of feasibility, 843 Range of insignificance, 842 Range of optimality, 841 Raw materials, location decisions and, 346 Reactive planning strategies, 467 Readings

$$$, 548 The ABCs of ERP, 518–521 Active RFID vs Passive RFID, 676 Agility Creates a Competitive Edge, 26 AMAZON Tops in Customer Service, 45 Analytics, 19 At 3M, a Long Road Became a Shorter Road, 655 Bar Codes Might Cut Drug Errors in Hospitals, 441 Benchmarking Corporate Web Sites of Fortune 500

Companies, 400 Best Buy Wants Your Junk, 145 BMW’s Strategy: Flexibility, 270 To Build a Better Hospital, Virginia Mason Takes lessons From

Toyota Plants, 632 The Challenges of Managing Services, 166 Choosing Incentive Plans, 298–299 Clicks or Bricks, or Both?, 679 David H. Maister on the Psychology of Waiting, 811 Design as a Business Strategy, 136 Desperately Seeking E-Fulfillment, 665 Diet and the Environment: Vegetarian vs Nonvegetarian, 29 Do You Want Pickled Beets with That?, 143 Duplicate Orders Can Lead to Excess Capacity, 462 Dutch Boy Brushes Up Its Paints, 138 Dutch Tomato Growers’ Productivity Advantage, 60 E-Procurement at IBM, 666 Excess Capacity Can Be Bad News!, 186 Foxconn Shifts Its Focus to Automation, 246 Gazing at the Crystal Ball, 113–114 General Mills Turns to NASCAR to Reduce Changeover

Time, 612 High Forecasts Can Be Bad News, 80 Hyundai: Kissing Clunkers Goodbye, 378 IBM’s Supply Chain Social Responsibility, 663 Improving Quality and Reducing Risk in Offshoring, 384 In the Chips at Jays, 415–416 Innovative MCI Unit Finds Culture Shock in Colorado

Springs, 344 Kraft Foods’ Recipe for Sustainability, 146 Lego A/S in the Pink, 151 Managing Waiting Lines at Disney World, 812 My Compliments to the Chef, er, Buyer, 196 Nearby Suppliers Match Ford’s Mix, 629 NestléUSA and Ocean Spray Form Strategic Operations

Alliance, 669 New Yorkers Do Not Like Waiting in Line, 785 “People” Firms Boost Profits, Study Shows, 617 Product Redesign, Not Offshoring, Holds Cost Advantage

for U.S. Manufacturers, 137–138

ste24102_sidx_880-910.indd 896ste24102_sidx_880-910.indd 896 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

Subject Index 897

appointment system, 712 assignment model, 697–700 backward, 695 benefits, 689 cyclical, 714–715 defined, 689 flow-shop, 690–692 forward, 695 Gantt charts, 22, 693–694, 739–740 high-volume systems, 690–692 Hungarian method, 697–700 intermediate volume systems, 692–693 job shops/low-volume system

loading, 693–700 sequence dependent setup times, 709 sequencing, 700–706 two work centers, sequencing through, 707–709

master, 459, 477–482, 496–497 multiple resources, 715 objectives of, 690 problems with, 691, 709–710 reservation system, 712 service systems, 711–715 theory of constraints, 710–711, 761 time fences, 479, 513 workforce, 714 yield management, 26, 77, 477, 712–713

Schematic decision making models, 18 Scherkenbach, W. W., 408 Schiller, Zachary, 66 Schonberger, Richard J., 614 Schragenheim, Eli, 201n Science of management, 21 Scientific management, 21–23, 289, 293, 368 SCOR®, 678 Scrap rates, 61 Seasonal demand patterns, 193, 198–199 Seasonal indexes, 97 Seasonal inventories, 549 Seasonal relative, 97– 100 Seasonal variations, 95, 193 Seasonality, 84– 85 , 95–100 Sebastianelli, Rose, 400 Secondary reports, 508 Self-directed teams, 292– 293 Sensitivity analysis, 224– 225 , 841 –844 Sequence dependent setup times, 709 Sequencing, 700– 706 Sequential relationships, 741 Servers, numbers of, 787 Service, 162 Service blueprint, 164– 165 Service delivery system, 162 Service design, 162–166; see also Design, of products and services Service layouts, 258–262 Service level, 570 Service package, 162 Service patterns, 788–789 Service profiling, 244 Serviceability, 136 Services

Return on quality, 379 Returns, management of, 679–681 Reuse, 145–146 Revenue management, 26 Reverse engineering, 139 Reverse logistics, 680 Rework costs, 380 RFID, 245, 553, 674–676 Rich, Nick, 639 Right-hand side (RHS) change, 842–844 Right-sized equipment, 257 Rights Principle, 29 Risk

decision making under, 220–221 defined, 218 globalization, 341–342 of lean systems, 607 management of, 27, 654–656, 763–764 of outsourcing, 195, 384, 653–654

Ritter, Diane, 408 Robinson, Alan, 628 Robot, 247 Robust design, 154 Rodrigues, Jorge Nascimento, 610n ROI, 548 Rolling horizon, 506 Rolling planning horizon, 460 Romig, H. G., 23, 369 Roos, Daniel, 38, 606, 639 Rother, Mike, 627n, 639 Rough-cut capacity planning, 479 Row reduction, 697 Roy, David M., 408, 639 Run, 432 Run chart, 397 Run size, of jobs, 692 Run tests, 432– 435 Rusche, Chris, 599 Rush, 700

S/O (Slack per operation) rule, 700 Sabolik, Jerome, 344 Safety, 61, 295–296 Safety stock, 508 – 509 , 550, 557, 569– 570 Salaries/wages, 296–299 Salegna, Gary, 387n Sales and operations planning, 457– 458; see also Aggregate

planning Sales systems, point-of, 552 Salesforce opinions, used to forecast, 83 Salvendy, Gavriel, 324 Sampling, 312–316; see also Acceptance sampling Sampling distribution, 418– 419 Sampling theory, 23 Samuel, Donna, 639 Scanning, environmental, 47–48 Scatter diagrams, 395– 396 Schedule chart, 694 –695 Scheduled receipts, 501– 502 Scheduling, 688 – 729

airline industry, 15

ste24102_sidx_880-910.indd 897ste24102_sidx_880-910.indd 897 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

898 Subject Index

Small Business Administration, 658 SMED, 257, 612–613 Smith, Adam, 23 Smith, Bernard T., 91n Smoothing, exponential, 89–91 Snee, Ronald D., 408 Soft information, 82 Sole source suppliers, 624 Solutions and corner points, 835 Sourcing, strategic, 678 Sower, Victor E., 728 S&P 500 Index, 377 SPC; see Statistical process control (SPC) Spear, Steven, 639 Spearman, Mark L., 133, 544, 603, 639, 728 Special variation, 418 Specialization, 290– 291 Specifications, 159 , 435 Spence, Randy, 140 Spreadsheets, used in aggregate planning, 468–472 SPT (shortest processing time), 700 Stacked lead time, 497 Stahl, Robert A., 492 Standard deviation, 13 Standard elemental times, 311 Standard error of estimate, 103 Standard parts, 610 Standard time, 306, 309 Standardization, 22 – 23 , 61, 151, 610 Stanley, Linda L., 38 Stanton, Steven, 73 Static sequencing, 701 Statistical models, 19, 23 Statistical process control (SPC), 417 – 435

control charts attributes, 422, 427–429 defined, 106, 396, 420 errors, 421–422 forecasting, 106–110 mean, 422–424 nonrandom patterns, 431 process, 419–422 range, 424–427 run tests, 431–435 for variables, 422–427 when to use, 430–431

control process, 419–422 defined, 417 process variability, 417–418, 436

Statistical quality control, 369 Statistical sampling theory, 23 Steinberg, Neil, 415–416 Step costs, 204 Stephens, Matthew P., 287 Steppingstone, 355 Stevenson, William J., 235, 408, 821, 853 Stewart, J. R., 324 Stocking levels, 577–580 Stockouts, 550, 569–570 Stoecker, Dean, 352 Stopwatch time study, 306– 311 , 316

aggregate planning, 475–477 airline industry, 14–15 capacity planning, 194–195 defined, 3 designing for, 162–166 employment in, 8, 16–17 ERP, 522 facilities layout, 258–262 inspection points, 414–415 in lean operations, 630–633 location planning, 351–352 versus manufacturing, 7–9 measuring productivity in, 8 MRP, 510 operations activities, 14–15 productivity, 59–60 quality of, 8, 15, 43, 373–374 scheduling of, 711–715

SERVQUAL, 374 Setup costs, 554, 692 Setup time

reduction of, 612–613, 692 sequence dependent, 709

Shadow price, 842 Shewhart, Walter, 23, 369–370, 420 Shewhart cycle, 388 Shih, Willy, 17 Shingo, Shigeo, 371, 605, 612, 616, 639 Shipping, evaluating alternatives, 676–677 Shook, John, 627n, 639 Short-range plans, 458 Short-term capacity needs, 193 Short-term forecasts, 76 Shortage costs, 554, 576 Shortest processing time (SPT), 700 Silverstein, Judith, 665 Simchi-Levi, David, 664, 687 Simchi-Levi, Edith, 664, 687 Simo chart, 304–305 Simple average method, 99–100 Simple linear regression, 101–105 Simplex method, 838 Simulation, 206, 756–757 Simulation models, 475 Simultaneous chart, 304–305 Simultaneous development, 160 Single-channel servers, 787 Single-minute exchange of die (SMED), 257 , 612 –613 Single-period model, 576– 580 Single server

constant service time, 794–795 exponential service time, 793–794

Site related location factors, 348–349 Six sigma, 26 , 390 –392, 438, 628, 761 Slack, 742, 837– 838 Slack, Nigel, 73 Slack per operation rule, 700 Slack time, 463–464, 750 Slater, Derek, 518 Slushy, 479 Small business, 657–658, 683

ste24102_sidx_880-910.indd 898ste24102_sidx_880-910.indd 898 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

Subject Index 899

Supply chain management, 648–687; see also Purchasing challenges, 681–683 creating effective, 678–683 defined, 650 e-business, 24–25, 31, 663–666 electronic data interchange, 666 elements of, 32–33 ERP and, 656–657 ethics and; see Ethics global, 25, 31 goals of, 651 importance of, 31–32 location planning, 339 logistics, 650, 672–678 management responsibilities, 658–660 outsourcing; see Outsourcing purchasing and, 659–663 requirements for success, 679 reverse logistics, 680 RFID, 553, 674–676 risk management, 654–656 small business, 657–658, 683 strategy alignment, 659 supplier management, 667–669 tactical and operational responsibilities, 659–660 trends, 653–656 value chains, 651

Supply Chain Operations Reference, 678 Supply chain visibility, 655 Supporting processes, 12 Surplus, 837– 838 Surveys, consumer, 83 Sustainability, 28– 29 , 46, 50, 144–149, 653 Sustainable production, 244 Swank, Cynthia Karen, 639 Sweeney, Dennis J., 235, 821, 853 SWOT analysis, 47 System, 20 System design, 16; see also Process selection and design System nervousness, 513 System operation, 16 System utilization, 790 Systems approach, to decision making, 20

Tactical decisions, 16 Tactics, 45 Taghizadegan, Salman, 639 Taguchi, Genichi, 154, 371, 440 Taguchi cost function, 440 Taguchi loss function, 371 Takt time, 614– 615 Tamimi, Nabil, 400 Tangible output, 7 Tariffs, 25 Taxes, impact on location decisions, 347 Taylor, Bernard W., 235, 821, 853 Taylor, Frederick Winslow, 21–23, 289, 293, 306, 368 Teams

benefits of, 293 forms of, 292

Storage, 615–616 Storage layouts, 259 Straight piecework, 297 Strategic buffering, 670 Strategic decisions, 32 Strategic partnering, 669 Strategic sourcing, 678 Strategies

Balanced Scorecard, 54–56 comparison of, 52 defined, 44 examples of, 46, 47 external factors, 48 formulation of, 46–50 functional, 45 global, 50–51 goals, 44 growth, 49 implications of, 54 internal factors, 48–49 mission, 44 near-sourcing, 659 operations, 26, 47, 51–54 organizational, 44–46, 54 quality-based, 53 reasons for failure, 49 responsive, 659 supply chain, 50 sustainability, 50 technology changes and, 48, 60 time-based, 53–54

Strengths, weaknesses, opportunities, and threats (SWOT), 47 Structural variation, 13 Subcontracting, 465 Suboptimization, 218 Substitutability, of parts, 162 Summers, Donna, 389, 408, 454 Supplier code of conduct, 668 Supplier forums, 668 Supplier-managed inventory, 633, 670–671 Supplier relationship management, 668 Suppliers

analysis of, 667 audits, 667 certification of, 624, 668 JIT systems, 624–625 management of, 667–669 partnerships with, 668–669 quality and, 386 relationships with, 624–625, 668 selection of, 661, 667 sole source, 624 tiers of, 624–625 world class, 668

Supply chain capacity planning and, 191 closed loop, 681 defined, 4, 649 global, 25, 31, 656 quality and, 383–384

ste24102_sidx_880-910.indd 899ste24102_sidx_880-910.indd 899 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

900 Subject Index

Tracking capacity strategy, 191 Tracking signal, 108– 110 Trade agreements, 340 Trade-offs, 19, 681–682 Traffic management, 674 Training, 270, 617 Transaction processing, reduction of, 625–626 Transfer batch, 711 Transfer pricing rules, 345 Transformation process, 5–7 Transportation

costs, 272–273, 340, 341, 343, 345, 346, 682 cross-docking, 682 facilities layout, 272–273 logistics, 650, 672–678 model, 354–355, 472–474

Trend, 84– 85 , 91–94 Trend-adjusted exponential smoothing, 95 Trend patterns, 431 Trial-and-error techniques, 468–472 Trusko, Brett, 408 Trust, in management, 291–292 Turnover

of inventory, 551 of labor, 61

Two-bin system, 552, 623 Two work centers, sequencing jobs

through, 707–709 Type I error, 421– 422 Type II error, 421– 422

U-shape layouts, 252–253 UCC, 141 Ulrich, Karl T., 170 Uncertainty, 218– 219 , 683 Uneven demand, meeting, 465–467 Uniform Commercial Code, 141 U.S. China Trade Relations Act, 340 Universal Product Code (UPC), 552 Upper control limits (UCL), 107, 421 Upper-management processes, 12 Utilitarian Principle, 29 Utilization, capacity, 189

Value-added, 7 Value analysis, 145, 147 Value chains, 651 Value stream mapping, 627– 628 Van Wassenhove, Luk N., 687 Vaporware, 142 Variability, 417–418, 436, 683 Variable costs, 202, 353–354 Variable demand, 574 Variables

causal, 82 charts for, 422–427 decision, 824–825 defined, 422 explanatory, 82

keys to success, 293 problem solving and, 386 for process improvement, 606 self-managed/directed, 292–293 virtual, 143, 761–762

Technological innovation, 244 Technology; see also Internet

changes in, 48, 60 defined, 25, 244 forecasting, 84 management of, 25 product design, 137 productivity improvements and, 60

Temperature and humidity, 294 Temporary workers, 810 Teplitz, Charles T., 335 Terrorism, 342 Theory of constraints, 710 –711, 761 The Theory of Constraints, 201 Theory X, Y, Z, 23 Therbligs, 304 Third-party logistics, 677– 678 Three-sigma, 438 Throughput, 711 Time-based competition, 459 Time-based strategy, 53– 54 Time-based system, 296– 298 Time buckets, 497, 500 Time estimates

deterministic, 743 probabilistic, 743, 751–753

Time fences, 479, 513 Time horizon, 79 Time-ordered plot, 420 Time-phased requirements, 500 Time reduction, 26, 53–54 Time series, 84 Time series data, forecasting using

averaging, 86–91, 98–100 cycles, 100 defined, 82 exponential smoothing, 89–91 seasonality, 95–100, 193, 198–199 trend, 91–94 trend-adjusted exponential smoothing, 95

Time-series forecasts, 82 Time studies, 306–311, 316 Time-to-market, 42 Time value of money, 206 Timing, 194 Tippett, L. H. C., 23 Tolerances, 435 Total-cost curve, 564–568 Total productive maintenance, 643 Total quality management (TQM), 26, 384–388, 385;

see also Quality Toyoda, Eiji, 608 Toyota approach, 607–609 Toyota Production System (TPS), 607, 632

ste24102_sidx_880-910.indd 900ste24102_sidx_880-910.indd 900 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

Subject Index 901

Werbach, Adam, 73 Wheeler, John, 273n White, John A., 287 White noise, 86 Whitney, Eli, 22 Whybark, D. Clay, 215, 492, 544, 608, 639, 728 Wichern, Dean, 133 Wiesenborn, Gary, 344 Wilkerson, Ella Mae, 141 Williams, Bruce, 408 Williams, Thomas A., 235, 821, 853 Wilson, J. Holton, 111, 133 Winebrake, James J., 653n Wisner, Joel D., 38 Wolverson, Roya, 26 Womack, James P., 38, 606, 639 Woolsey, Gene, 548 Work breakdown structure (WBS), 739 Work breaks, 295 Work design, 288–324

behavioral approaches, 291 compensation, 296–299 ergonomics, 293–294 human relations movement, 23 methods analysis, 299–303 motion study, 22, 303–305 motivation, 23, 291–292 specialization, 290–291 teams; see Teams working conditions, 294–296

Work-in-process inventory, 548, 615, 623–624 Work measurement; see also Job design

defined, 305 predetermined time standards, 311–312 standard elemental times, 311 standard time, 306, 309 stopwatch time study, 306–311

Work sampling, 312– 316 Work system design; see Job design Worker fatigue, 23 Worker-machine chart, 302– 303 Workers, as assets, 616 Workforce scheduling, 714 Working conditions, 294–296 Workstation, 269 – 270 , 700 World class suppliers, 668 World Trade organization, 340 Wyosoki, Robert K., 781

x-bar chart, 422–424

Yield management, 26 , 77, 477, 712 –713

Zeithaml, Valarie A., 373n, 374n Zero defects, 369, 371 Zijlstra, Emma, 287 Zucco, James, 344

leading, 100 predictor, 101

Variations assignable, 13, 418 in demand, 460 irregular, 84–85 nonrandom, 418 process, 13–14 random, 13, 84–85, 417 seasonal, 84–85, 95–100, 193

Velocity, 670, 679 Vendor analysis, 667 Vendor-managed inventory (VMI), 633 , 670 –671 Ventilation, 294 Vertical loading, 291 Vertical skills, 299 Vicente, Kim, 170 Virtual project teams, 143 , 761 –762 Virtue Principal, 29 Visual inspection, 258 Visual systems, 621–623 Vogel’s approximation method, 355 Volatility, of demand, 194–195 Vollman, Thomas E., 492, 544, 608, 625n, 639, 707n, 728

Wages/salaries, 296–299 Wagner, Brett, 544 Wagner-Whitin model, 510 Wait-and-see strategy, 207 Waiting lines, 782–821

analysis of, 206 arrival and service patterns, 788–789 characteristics of, 786–790 constraint management, 810–811 cost analysis, 799–801 finite-source models, 805–810 goals of management, 785–786 infinite source models

basic relationships, 791–793 four models, 790–791 multiple priorities, 802–805 multiple servers, 795–799 single server, 793–795

managerial implications, 785 maximum line length, 801 performance measures, 790 psychology of, 811–812 queue discipline, 789–790 queuing theory, 784 reasons for, 784

Wallace, Thomas F., 492 Warehousing, 259 Warranties, implied, 141 Waste, in JIT, 609–610 The Wealth of Nations, 23 Webster, Scott, 687 Weighted average, 88– 89 Weightman, Clive, 522–523 Weinstein, Bob, 737–738

ste24102_sidx_880-910.indd 901ste24102_sidx_880-910.indd 901 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

902

Notes

ste24102_sidx_880-910.indd 902ste24102_sidx_880-910.indd 902 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

903

Notes

ste24102_sidx_880-910.indd 903ste24102_sidx_880-910.indd 903 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

904

Notes

ste24102_sidx_880-910.indd 904ste24102_sidx_880-910.indd 904 11/28/13 11:33 AM11/28/13 11:33 AM

Final PDF to printer

  • Cover
  • Title
  • Copyright
  • Contents
  • Preface
  • 1 Introduction to Operations Management
    • Introduction
    • Production of Goods Versus Providing Services
    • Why Learn About Operations Management?
    • Career Opportunities and Professional Societies
    • Process Management
    • The Scope of Operations Management
      • Reading: Why Manufacturing Matters
    • Operations Management and Decision Making
      • Reading: Analytics
    • The Historical Evolution of Operations Management
    • Operations Today
      • Reading: Agility Creates a Competitive Edge
    • Key Issues for Today's Business Operations
      • Readings: Universities Embrace Sustainability
      • Diet and the Environment: Vegetarian vs. Nonvegetarian
    • Summary
    • Key Points
    • Key Terms
    • Discussion and Review Questions
    • Taking Stock
    • Critical Thinking Exercises
      • Case: Hazel
    • Selected Bibliography and Further Readings
    • Problem-Solving Guide
  • 2 Competitiveness, Strategy, and Productivity
    • Introduction
    • Competitiveness
    • Mission And Strategies
      • Reading: AMAZON Tops in Customer Service
    • Operations Strategy
      • Reading: Productivity Gains Curb Inflation
    • Implications of Organization Strategy for Operations Management
    • Transforming Strategy into Action: The Balanced Scorecard
    • Productivity
      • Readings: Why Productivity Matters
      • Dutch Tomato Growers' Productivity Advantage
      • Productivity Improvement
    • Summary
    • Key Points
    • Key Terms
    • Solved Problems
    • Discussion and Review Questions
    • Taking Stock
    • Critical Thinking Exercises
    • Problems
      • Cases: An American Tragedy: How a Good Company Died
      • Home-Style Cookies
      • Hazel Revisited
      • "Your Garden Gloves"
      • Operations Tour: The U.S. Postal Service
    • Selected Bibliography and Further Readings
  • 3 Forecasting
    • Introduction
    • Features Common to All Forecasts
    • Elements of a Good Forecast
    • Forecasting and the Supply Chain
    • Steps in the Forecasting Process
    • Forecast Accuracy
      • Reading: High Forecasts Can Be Bad News
    • Approaches to Forecasting
    • Qualitative Forecasts
    • Forecasts Based on Time-Series Data
    • Associative Forecasting Techniques
    • Monitoring Forecast Error
    • Choosing a Forecasting Technique
    • Using Forecast Information
    • Computer Software in Forecasting
      • Reading: Gazing at the Crystal Ball
    • Summary
    • Key Points
    • Key Terms
    • Solved Problems
    • Discussion and Review Questions
    • Taking Stock
    • Critical Thinking Exercises
    • Problems
      • Cases: M&L Manufacturing
      • Highline Financial Services, Ltd.
    • Selected Bibliography and Further Readings
  • 4 Product and Service Design
    • Introduction
      • Readings: Design as a Business Strategy
      • Product Redesign, Not Offshoring, Holds Cost Advantage for U.S. Manufacturers
      • Dutch Boy Brushes Up Its Paints
    • Idea Generation
      • Reading: Vlasic on a Roll with Huge Pickle Slices
    • Legal and Ethical Considerations
    • Human Factors
    • Cultural Factors
    • Global Product and Service Design
      • Reading: Do You Want Pickled Beets with That?
    • Environmental Factors: Sustainability
    • Readings: Best Buy Wants Your Junk
    • Kraft Foods' Recipe for Sustainability
    • Xerox Diverts 2 Billion Pounds of Waste from Landfills through Green Initiatives
    • Recycle City: Maria's Market
    • Other Design Considerations
      • Reading: Lego A/S in the Pink
    • Phases in Product Design and Development
    • Designing for Production
    • Service Design
      • Reading: The Challenges of Managing Services
    • Operations Strategy
    • Summary
    • Key Points
    • Key Terms
    • Discussion and Review Questions
    • Taking Stock
    • Critical Thinking Exercises
    • Problems
      • Operations Tour: High Acres Landfill
    • Selected Bibliography and Further Readings
    • SUPPLEMENT TO CHAPTER 4: Reliability
  • 5 Strategic Capacity Planning for Products and Services
    • Introduction
      • Reading: Excess Capacity Can Be Bad News!
    • Capacity Decisions Are Strategic
    • Defining and Measuring Capacity
    • Determinants of Effective Capacity
    • Strategy Formulation
    • Forecasting Capacity Requirements
    • Additional Challenges of Planning Service Capacity
    • Do it In-House or Outsource It?
    • Developing Capacity Strategies
      • Reading: My Compliments to the Chef, er, Buyer
    • Constraint Management
    • Evaluating Alternatives
    • Operations Strategy
    • Summary
    • Key Points
    • Key Terms
    • Solved Problems
    • Discussion and Review Questions
    • Taking Stock
    • Critical Thinking Exercises
    • Problems
      • Case: Outsourcing of Hospital Services
    • Selected Bibliography and Further Readings
    • SUPPLEMENT TO CHAPTER 5: Decision Theory
  • 6 Process Selection and Facility Layout
    • Introduction
    • Process Selection
    • Technology
      • Reading: Foxconn Shifts Its Focus to Automation
    • Process Strategy
    • Strategic Resource Organization: Facilities Layout
      • Reading: A Safe Hospital Room of the Future
    • Designing Product Layouts: Line Balancing
      • Reading: BMW's Strategy: Flexibility
    • Designing Process Layouts
    • Summary
    • Key Points
    • Key Terms
    • Solved Problems
    • Discussion and Review Questions
    • Taking Stock
    • Critical Thinking Exercises
    • Problems
    • Selected Bibliography and Further Readings
  • 7 Work Design and Measurement
    • Introduction
    • Job Design
    • Quality of Work Life
      • Reading: Choosing Incentive Plans
    • Methods Analysis
    • Motion Study
    • Work Measurement
    • Operations Strategy
    • Summary
    • Key Points
    • Key Terms
    • Solved Problems
    • Discussion and Review Questions
    • Taking Stock
    • Critical Thinking Exercise
    • Problems
      • Case: Making Hotplates
    • Selected Bibliography and Further Readings
    • SUPPLEMENT TO CHAPTER 7: Learning Curves
  • 8 Location Planning and Analysis
    • The Need for Location Decisions
    • The Nature of Location Decisions
    • Global Locations
    • General Procedure for Making Location Decisions
    • Identifying a Country, Region, Community, and Site
      • Reading: Innovative MCI Unit Finds Culture Shock in Colorado Springs
    • Service and Retail Locations
      • Reading: Site Selection Grows Up: Improved Tech Tools Make the Process Faster, Better
    • Evaluating Location Alternatives
    • Summary
    • Key Points
    • Key Terms
    • Solved Problems
    • Discussion and Review Questions
    • Taking Stock
    • Critical Thinking Exercises
    • Problems
      • Case: Hello, Walmart?
    • Selected Bibliography and Further Readings
  • 9 Management of Quality
    • Introduction
    • The Evolution of Quality Management
      • Reading: Whatever Happened to Quality?
    • The Foundations of Modern Quality Management: The Gurus
    • Insights on Quality Management
      • Readings: The Sounds of Quality
      • Hyundai: Kissing Clunkers Goodbye
    • Quality Awards
      • Reading: Rework and Morale
    • Quality Certification
    • Quality and the Supply Chain
    • Total Quality Management
      • Reading: Improving Quality and Reducing Risk in Offshoring
    • Problem Solving and Process Improvement
      • Reading: What Keeps Six Sigma Practitioners Up at Night?
    • Quality Tools
      • Reading: Benchmarking Corporate Web Sites of Fortune
      • Companies
    • Operations Strategy
    • Summary
    • Key Points
    • Key Terms
    • Solved Problem
    • Discussion and Review Questions
    • Taking Stock
    • Critical Thinking Exercises
    • Problems
      • Cases: Chick-n-Gravy Dinner Line
      • Tip Top Markets
    • Selected Bibliography and Further Readings
  • 10 Quality Control
    • Introduction
    • Inspection
      • Reading: In the Chips at Jays
    • Statistical Process Control
    • Process Capability
    • Operations Strategy
      • Reading: Bar Codes Might Cut Drug Errors in Hospitals
    • Summary
    • Key Points
    • Key Terms
    • Solved Problems
    • Discussion and Review Questions
    • Taking Stock
    • Critical Thinking Exercises
    • Problems
      • Cases: Toys, Inc.
      • Tiger Tools
    • Selected Bibliography and Further Readings
  • 11 Aggregate Planning and Master Scheduling
    • Introduction
      • Reading: Duplicate Orders Can Lead to Excess Capacity
    • Basic Strategies for Meeting Uneven Demand
    • Techniques for Aggregate Planning
    • Aggregate Planning in Services
    • Disaggregating the Aggregate Plan
    • Master Scheduling
    • The Master Scheduling Process
    • Summary
    • Key Points
    • Key Terms
    • Solved Problems
    • Discussion and Review Questions
    • Taking Stock
    • Critical Thinking Exercise
    • Problems
      • Case: Eight Glasses a Day (EGAD)
    • Selected Bibliography and Further Readings
  • 12 MRP and ERP
    • Introduction
    • An Overview of MRP
    • MRP Inputs
    • MRP Processing
    • MRP Outputs
    • Other Considerations
    • MRP in Services
    • Benefits and Requirements of MRP
    • MRP II
    • Capacity Requirements Planning
    • ERP
      • Readings: The ABCs of ERP
      • The Top 10 ERP Mistakes
    • Operations Strategy
    • Summary
    • Key Points
    • Key Terms
    • Solved Problems
    • Discussion and Review Questions
    • Taking Stock
    • Critical Thinking Exercises
    • Problems
      • Cases: Promotional Novelties
      • DMD Enterprises
      • Operations Tour: Stickley Furniture
    • Selected Bibliography and Further Readings
  • 13 Inventory Management
    • Introduction
    • The Nature and Importance of Inventories
    • Requirements for Effective Inventory Management
      • Reading: Radio Frequency Identification (RFID) Tags
    • Inventory Ordering Policies
    • How Much to Order: Economic Order Quantity Models
    • Reorder Point Ordering
    • How Much to Order: Fixed-Order-Interval Model
    • The Single-Period Model
    • Operations Strategy
    • Summary
    • Key Points
    • Key Terms
    • Solved Problems
    • Discussion and Review Questions
    • Taking Stock
    • Critical Thinking Exercises
    • Problems
      • Cases: UPD Manufacturing
      • Harvey Industries
      • Grill Rite
      • Farmers Restaurant
      • Operations Tours: Bruegger's Bagel Bakery
      • PSC, Inc.
    • Selected Bibliography and Further Readings
  • 14 JIT and Lean Operations
    • Introduction
      • Reading: Toyota Recalls
    • Supporting Goals
    • Building Blocks
      • Readings: General Mills Turns to NASCAR to Reduce Changeover Time
      • "People" Firms Boost Profits, Study Shows
    • Lean Tools
    • Transitioning to a Lean System
      • Reading: Nearby Suppliers Match Ford's Mix
    • Lean Services
      • Reading: To Build a Better Hospital, Virginia Mason Takes Lessons from Toyota Plants
    • JIT II
    • Operations Strategy
    • Summary
    • Key Points
    • Key Terms
    • Solved Problems
    • Discussion and Review Questions
    • Taking Stock
    • Critical Thinking Exercises
    • Problems
      • Case: Level Operations
      • Operations Tour: Boeing
    • Selected Bibliography and Further Readings
    • SUPPLEMENT TO CHAPTER 14: Maintenance
  • 15 Supply Chain Management
    • Introduction
      • Reading: Veggie Tales
    • Trends in Supply Chain Management
      • Reading: At 3M, a Long Road Became a Shorter Road
    • Global Supply Chains
    • ERP and Supply Chain Management
    • Ethics and the Supply Chain
    • Small Businesses
    • Management Responsibilities
    • Procurement
    • E-Business
      • Readings: IBM's Supply Chain Social Responsibility
      • Desperately Seeking E-Fulfillment
      • E-Procurement at IBM
    • Supplier Management
      • Reading: NestléUSA and Ocean Spray Form Strategic Operations Alliance
    • Inventory Management
    • Order Fulfillment
    • Logistics
      • Operations Tour: Wegmans' Shipping System
      • Readings: Springdale Farm
      • RFID Tags: Keeping the Shelves Stocked
      • Active RFID vs. Passive RFID
      • Rise of the 3PL
    • Creating An Effective Supply Chain
      • Reading: Clicks or Bricks, or Both?
    • Strategy
    • Summary
    • Key Points
    • Key Terms
    • Discussion and Review Questions
    • Taking Stock
    • Critical Thinking Exercises
    • Problems
      • Cases: Master Tag
      • B&L Inc.
    • Selected Bibliography and Further Readings
  • 16 Scheduling
    • Scheduling Operations
    • Scheduling in Low-Volume Systems
    • Scheduling Services
      • Readings: Servicing Passenger Planes
    • Summary
    • Key Points
    • Key Terms
    • Solved Problems
    • Discussion and Review Questions
    • Taking Stock
    • Critical Thinking Exercises
    • Problems
      • Case: Hi-Ho, Yo-Yo, Inc.
    • Selected Bibliography and Further Readings
  • 17 Project Management
    • Introduction
    • Project Life Cycle
    • Behavioral Aspects of Project Management
      • Reading: Project Managers Have Never Been More Critical
    • Work Breakdown Structure
    • Planning and Scheduling with Gantt Charts
    • PERT and CPM
    • Deterministic Time Estimates
    • A Computing Algorithm
    • Probabilistic Time Estimates
    • Determining Path Probabilities
    • Simulation
    • Budget Control
    • Time–Cost Trade-Offs: Crashing
    • Advantages of Using PERT and Potential Sources of Error
    • Critical Chain Project Management
    • Other Topics in Project Management
    • Project Management Software
    • Risk Management
    • Summary
    • Key Points
    • Key Terms
    • Solved Problems
    • Discussion and Review Questions
    • Taking Stock
    • Critical Thinking Exercises
    • Problems
      • Cases: The Case of the Mexican Crazy Quilt
      • Time, Please
    • Selected Bibliography and Further Readings
  • 18 Management of Waiting Lines
    • Why is There Waiting?
    • Managerial Implications of Waiting Lines
    • Goal of Waiting-Line Management
      • Reading: New Yorkers do not Like Waiting in Line
    • Characteristics of Waiting Lines
    • Measures of Waiting-Line Performance
    • Queuing Models: Infinite-Source
    • Queuing Model: Finite-Source
    • Constraint Management
    • The Psychology of Waiting
      • Readings: David H. Maister on the Psychology of Waiting
      • Managing Waiting Lines at Disney World
    • Operations Strategy
    • Summary
    • Key Points
    • Key Terms
    • Solved Problems
    • Discussion and Review Questions
    • Taking Stock
    • Critical Thinking Exercises
    • Problems
      • Case: Big Bank
      • Readings: Stopped at a Light? Why Not Read This, You May Have Time
    • Selected Bibliography and Further Readings
  • 19 Linear Programming
    • Introduction
    • Linear Programming Models
    • Graphical Linear Programming
    • The Simplex Method
    • Computer Solutions
    • Sensitivity Analysis
    • Summary
    • Key Points
    • Key Terms
    • Solved Problems
    • Discussion and Review Questions
    • Problems
      • Cases: Son, Ltd.
      • Custom Cabinets, Inc.
    • Selected Bibliography and Further Readings
  • Appendix A: Answers to Selected Problems
  • Appendix B: Tables
  • Appendix C: Working with the Normal Distribution
  • Photo Credits
  • Company Index
    • A
    • B
    • C
    • D
    • E
    • F
    • G
    • H
    • I
    • J
    • K
    • L
    • M
    • N
    • O
    • P
    • R
    • S
    • T
    • U
    • V
    • W
    • X
    • Z
  • Subject Index
    • A
    • B
    • C
    • D
    • E
    • F
    • G
    • H
    • I
    • J
    • K
    • L
    • M
    • N
    • O
    • P
    • Q
    • R
    • S
    • T
    • U
    • V
    • W
    • X
    • Y
    • Z