Chapter 3
Figure 2-1
Robert R. Taylor School of Architecture and Construction Science CSMT 360 ‐ Construction Accounting and Finance ‐ Spring 2020 Homework ASSIGNMENT (Due: February 11, 2020 by 9pm) Chapters 3
Name:_ _________________________________
1. The following invoices are being entered into the accounting system. Using the chart of accounts in Figure 2-1, determine the changes to the balance sheet, income statement, job cost ledger, and equipment ledger as the result of entering each of the following invoices:
a. A $5,000 invoice for concrete charged to job cost code 302.01.32300M
b. A $12,350 invoice from a subcontractor for plumbing charged to job cost code 309.02.22100S. Ten percent (10%) retention is withheld from the invoice.
c. A $255 phone bill charged to job cost code 315.01.001800O.
d. A $1,352 bill for main office rent.
e. A $112 invoice for office supplies for the main office.
f. A $375 invoice for repairs to Backhoe 2.
g. $563 invoice for nails. The nails will be placed in inventory until they are needed on the jobs, at which time they will be billed to the jobs.