Chamberlain College of Nursing NR632 Nurse Executive II

MM3 Project

Monitoring-and-Controlling Sample

Project Management

Knowledge Area

Monitoring and Controlling

Frequency

Detailed Description of F or E ratings

Process

Outputs

Integration Management

Monitor-and-control project work

Integrate change control

Recommended corrective actions

Rejected change requests

F

N

We were dealing with new technology that needed to be tweaked as the project progressed. The team recognized the need for corrective action in order to integrate other technologies or refine the product.

Scope Management

Scope verification

Requested changes

N

Time Management

Schedule control

Requested changes

F

As the technology integration neared, both companies (Metaview and MTM) needed additional time to integrate the Cyves and the portal-access technology. There were also newer programs that recently entered the market that were added to the project to enhance the deliverable.

Cost Management

Controlling costs

Requested changes

O

Quality Management

Quality control

Quality baseline compared to actual deliverables

E

The quality of the product required iterative phases of quality control. The comparisons from expected to actual were continuous due to the technologic changes.

Human-Resource Management

Manage project team

Continue to complete the document as above

Communication Management

Risk management

Procurement Management

Frequency Key: N=Never, O = Occasional (1-4 times), F= Frequent (5-10 times), E = Excessive (>10 times)

Record the number of times that you had to monitor and control each knowledge area during the project, using the frequency key above.

Write a detailed description about any occurrences that happened more than 5 times or were rated frequent (F) or excessive (E).

Write a summary paragraph describing the results of the monitoring and controlling of processes and outputs that you conducted during your project.