13.

Student: Suyin Padron Date: 10/9/18

Instructor: Humberto Florez Course: SCM4153 ­ Production and Operations Management

Assignment: Module 5

a) Using the FCFS (first come, first served ) decision rule  for sequencing the jobs, the order is (assume that jobs  came in the order in which they are listed in the table):

Sequence Job

1 A

2 B

3 C

4 D

5 E

The average tardiness (job lateness) for the sequence  developed using the FCFS rule =   days  (round your response to two decimal places).

The percentage utilization for the sequence developed  using the FCFS rule =  % (enter your  response as a percentage rounded to two decimal places).

b) Using the EDD (earliest due date) decision rule for  sequencing the jobs, the order is (to resolve a tie, use the  order in which the jobs were received):

Sequence Job

1 (1)

2 (2)

3 (3)

4 (4)

5 (5)

The average tardiness (job lateness) for the sequence  developed using the EDD rule =   days  (round your response to two decimal places).

The percentage utilization for the sequence developed  using the EDD rule =  % (enter your  response as a percentage rounded to two decimal places).

c) Using the SPT (shortest processing time) decision rule  for sequencing the jobs, the order is (to resolve a tie, use  the order in which the jobs were received):

Sequence Job

1 (6)

The following jobs are waiting to be processed at the  same machine center. Jobs are logged as they  arrive:                                                                                   

  Job Due Date Duration  (days) A 314 5 B 315 3 C 313 8 D 312 16 E 325 40

All dates are specified as manufacturing planning  calendar days. Assume that all jobs arrive on day  .  Assume each job starts at the beginning of the day and  finishes at the end of the day  (a job that begins on day  275 and takes 8 days will finish on day  282, and the next  job begins in the morning of day  283). Compute all times  based on initiating work on day  .

275

275

10/9/2018 Module 5­Suyin Padron

https://xlitemprod.pearsoncmg.com/api/v1/print/en­us/om 2/3

1

2 (7)

3 (8)

4 (9)

5 (10)

The average tardiness (job lateness) for the sequence  developed using the SPT rule =   days  (round your response to two decimal places).

The percentage utilization for the sequence developed  using the SPT rule =  % (enter your  response as a percentage rounded to two decimal places).

d) Using the LPT (longest processing time) decision rule  for sequencing the jobs, the order is (to resolve a tie, use  the order in which the jobs were received):

Sequence Job

1 (11)

2 (12)

3 (13)

4 (14)

5 (15)

The average tardiness (job lateness) for the sequence  developed using the LPT rule =   days  (round your response to two decimal places).

The percentage utilization for the sequence developed  using the LPT rule =  % (enter your  response as a percentage rounded to two decimal places).

10/9/2018 Module 5­Suyin Padron

https://xlitemprod.pearsoncmg.com/api/v1/print/en­us/om 3/3

(1)   D  A  B  C

 E (2)   C  D  B  E

 A (3)   D  E  A  C

 B (4)   A  C  D  B

 E (5)   C  B  A  D

 E

(6)   A  C  B  D

 E (7)   C  E  B  D

 A (8)   A  C  D  E

 B (9)   A  B  E  C

 D

(10)   A  B  E  D

 C (11)   A  E  C  B

 D (12)   D  B  E  C

 A (13)   B  A  E  D

 C

(14)   D  A  B  C

 E (15)   E  B  D  A

 C