Note: The case study below may not provide all of the information necessary to complete
the assignment. Students will have to use their personal experiences to complete some
aspects of the assignment. Students may also seek clarification from their tutor during
tutorials or office hours.
City Glaziers
City Glaziers is a medium business operating in and around the Melbourne metropolitan area.
The company supplies glass for windows and doors, and other structures within the Melbourne
area. Glass can be ordered in bulk as part of a construction project, or in smaller quantities as
replacement for broken windows, doors containing glass, bus shelters, and larger areas such as
internal feature walls etc. The company began by operating in the Melbourne CBD originally,
but has since expanded its operations to include most of the surrounding metropolitan area.
The company has built a reputation for providing high quality glass, as well as excellent service
to it customers.
Background
The owner of the company, Robert Johnston, began the company in 2001, operating a single
glaziers truck from a warehouse in North Melbourne. Robert operated successfully in the
Melbourne CBD, providing a high quality service to his clients. The business has steadily
increased over the last 14 years, and Robert now operates a fleet of 11 glazier trucks and has
expanded the operating territory to cover the entire Melbourne Metropolitan area.
The Business expansion has included a move to a large warehouse and glass preparation area,
with the head office located next door in a modern office block. The business seems to be
expanding and Robert is now beginning to consider opening franchises in outer Melbourne areas,
to be serviced from the central warehouse operation. Robert also has arranged to deal exclusively
with a large glass manufacturing plant, Melbourne Glass Plant, located in an outer Melbourne
suburb. By becoming a large customer of Melbourne Glass Plant, Robert gets lucrative discounts
which he can pass on to customers, helping him compete in this competitive environment.
The size of the business has now reached a stage where Robert can see major issues arising. As
the business has grown, the operations have become more complex, and this will only become
more so if franchises are added to the current operations.
Robert has decided to employ your team to investigate the business needs and to conduct an
initial feasibility study into the possible options for computerizing part or all of the operations.
MITS 5002 Case Study
Copyright © 2015-2019 VIT, All Rights Reserved. 3
Description of the Current System
The current system is a manual based system which has served the company well, but is now
becoming outdated and causing bottlenecks due to the increased workload demand. Currently the
business has two main areas, the Large Projects Section, and the Repair Section.
Large Projects
Anna Fields works for Robert in heading up this section of the business. In the Large Projects
section Anna and her staff put together quotes for whole jobs by responding to a construction
companies RFQs (Request For Quotes). The quotes are for complete supply of glass needs for
major construction projects such as new building projects or reconstruction projects on large
premises.
The team begin by identifying construction projects and responding to the company RFQ. The
team will contact the company to request precise specifications and put together a quote for
materials, delivery and installation. If the quote is successful, City Glaziers will then develop a
timeline document for approval by the company, and begin the ordering process. A timely order
will be placed with Melbourne Glass Plant for the raw material, and these will be delivered to the
warehouse. A Work Order is generated which includes a copy of the original quote and
specifications and sent to Glass Preparation, where the work will begin in preparing the glass
panes according to the specifications and delivery schedule.
Once the glass is prepared and cut to size, an Installation Order is prepared and a glazier truck
booked for the delivery and installation date.
Repair
Ben Hanscom is the head of the repair section, and also manages the Glazier Truck fleet.
Customers will ring in to the Repair section with requests for repair, or for replacement, and the
schedules will be checked to find the closest Glazier Truck. The repair request will be slotted
into the schedule of the closest truck, and usually result in a same day service. When the Glazier
arrives at a customers site, they will quickly check to see if the job can be performed
immediately, or if a special Work Order needs to be completed.
Each Morning, the Glazier trucks are outfitted with a standard compliment of glass sheets of
varying thicknesses and sizes. Over time this standard fit-out seems to cover a Glazier for most
of the day for their standard type repair jobs. The glass preparation area is responsible for
outfitting the truck each day with the standard compliment of glass, based on a compilation of
MITS 5002 Case Study
Copyright © 2015-2019 VIT, All Rights Reserved. 4
the completed Job Sheets completed each day by each Glazier. The only exception is when a
truck is specifically booked for a large project delivery and installation.
If a Glazier arrives at a repair job and cannot complete the job because they lack specific
materials, then a Work Order is completed and bought back to the warehouse so the Glass
preparation area can prepare the material for installation in the next day. If the Glazier can
complete the Job on the same day, then after finishing, they complete a Job Sheet, detailing the
material used so the Glass preparation area and replace the material used on the truck for the next
days work schedule.
Payment
When City Glaziers are awarded large scale projects with successful RFQ submissions, they are
given accounts with the company that awards the projects. They receive payment by direct debit
after they submit invoices to the company for materials and time (as per the awarded contract).
For smaller repair and replacement work, when a Job is complete, as well as filling in the Job
Sheet to detail the used material, the Glazier will also prepare an invoice to give to the customer
on the spot. The Glazier also returns a copy of the invoice to head office at the end of the day
when they return to the warehouse. The customer can choose to pay via the terms on the invoice,
7 days payment, or receive a 5% discount and pay on the same day via credit card, or personal
cheque with identification. Some Customers have accounts with City Glaziers, and will receive a
monthly statement through the post. These customers have longer terms, such as the end of the
month in which the statement is issued.
When a customer payment is received, a copy of the payment is sent to the head office accounts
section, where the payment is matched against the invoice and a receipt will be issued through
the post.
Regular reports need to be generated to list those invoices over their due dates that have not been
paid.
Supply Orders
The Glass preparation area in City Glaziers is responsible for collating all the Job Sheets and
Work Orders so that stock levels can be monitored and stock re-ordered when levels fall below
threshold levels.
Also, large project orders will need to be dealt with quickly so that existing stock levels for the
repair and replacement section is not affected
MITS 5002 Case Study
Copyright © 2015-2019 VIT, All Rights Reserved. 5
Issues
A number of issues have arisen that have prompted City Glaziers to contract you to look into the
system.
• It is difficult to keep track of the Work Orders and Job Sheets to re-order stock before it
falls below threshold levels.
• When Glaziers need to raise work-orders at a client site because they don't have the
material, it is not till the end of the day when Glaziers return to the warehouse that these
can be collated to begin preparation for the next day, resulting in some delays.
• Sometimes paperwork has gone missing for large scale projects and needs to be tracked
careful to avoid delays and loss of awarded contracts
• The fleet of Glazier trucks needs to be managed better as sometimes with the paperwork
double booking can occur and result in frustration and delays
• Additionally, we need to keep better track if kilometres travelled so trucks can be
services in a timely manner.
• Delays in sending paperwork to our suppliers can cause delays in order processing and
result in longer delivery times of stock.
• The level of paperwork is increasing and the accounts department is having trouble
keeping up with the timely production of monthly statements, processing of payments
and general financial reporting.
• With customers beginning to ask for different methods of payment such as email, PayPal
etc, we need to look at incorporating this into our business processes somehow