MIS302HWK-Ch8.docx

Management Information Systems

Chapter 8 Homework

1. Calculate the Bill of Materials. Fill in the table below assuming that 100 Wagons need to be produced

discovery%20wagon

Part Number

Description

Inventory Level

Amount to Order

2

Handle Bar

30

--

3

Bar Grip

100

?

4

Bar Tang

50

?

5

Wagon Body, Metal

10

?

6

Front Wheel Assembly

20

--

7

Front Wheels

50

?

8

Axel

80

?

9

Front Wheel Retainer

80

?

10

Rear Wheel Assembly

150

--

11

Rear Wheels

20

?

12

Axel

10

?

13

Wheel Retainer

20

?

14

Bar Stock

150

?

2. Lab: Create a BOM database to query the required number of materials.

Follow the instruction shown on in “LabBOM.doc” and paste your result table below. Two tables are required:

a. Table showing all required materials and quantity when wagon order quantity = 100 and inventory level = 0.

<paste your resulting screenshot here>

b. Table showing all required materials and quantity when wagon order quantity = 500 and inventory level = 100.

<paste your resulting screenshot here>