ENERGY EFFICIENT LOW-COST

BUILDING DESIGN IN SOUTH ASIA

USING COMPRESSED EARTH BLOCKS

AND SOLAR PANELS.

Vemury Structural Consultancy Ltd.

TEAM MEMBERS

- Boini Aishwarya Yadav Project Manager

•Current Degree – MSc Construction Project Management

- Keshav ShipthiCommunication Lead •Current Degree – MSc Construction Project Management

- Bhargava GullipalliResearch Lead •Current Degree – MSc Construction Project Management

•Evaluate the Project performance

•Monitor the Project progress

•Manage the Resources

create, implement and oversee

communications programs

•Carry out work according to protocols

• Collect and log experimental data.

•Conduct statistical analyses of data sets

PROJECT ENGAGEMENT PROCESS

Project

Needs Strategies Research &

Development

Client Requirements

Sustainable Needs Project Considerations

Manage

Plan

Build

Run

Project

AIM OF THE PROJECT

• To propose and implement various

construction techniques to aid in the

development of energy-efficient, low-cost

buildings in a specific region of south

Asian countries using compressed earth

blocks and solar panels.

https://images.app.goo.gl/Unh9LnKV7m6ffKze8

PROJECT KEY OBJECTIVES

https://images.app.goo.gl/7pUVJtBCcQSUQECA6

• Choosing an appropriate south Asian location. • A proper research on incorporating earth blocks

and solar panels into the building with its drawbacks.

• Research other low cost innovative ideas for improved energy efficiency.

• A detailed report containing all the investigation and research on energy-efficient low cost building design.

PROJECT ROADMAP

Location Identification of location

Investigation Investigation resources

Design process Design process of the construction

as per client requirement Implementation Implementation of various

techniques

Challenges To over come design challenges &

Implementations challenges Solutions Finding solutions for various

challenges

Status Maintain the project status

Risk Management/analysis Project cost Analysis

Project Delivery process

Maintenance Project records and

Chick list

Delivery

SELECTED LOCATION

DUNDIGAL

• Dundigal is a city and municipality in the Medchal - Malkajgiri district, Telangana, India.

• Area : Total 65 km2 (25 sq mi)

• Population (2011) : 40,817

CLIMATE - MAY

30°C night

40°C day

Humidity level 30%

25.73mm (9 days) rainfall

WHY DUNDIGAL?

• ,

• Telangana is a semi-arid area and has a predominantly hot and dry climate. Summers start in March, and peak in May with average high temperatures in the 42 °C (108 °F) range.

• Extreme heat and humidity

• The Economy of Telangana is mainly driven by agriculture. Most of the families cannot afford air- conditioning

INVESTIGATION

• Investigation resources is key point for any project, because every

project has their own needs based on their we need to find the

resources.

Hear our project is mainly based on LOW Cost Building

Constructions

Hear mainly two investigation concentrated

• Site Investigation

• Material Investigation

 Client availabilities are the main priorities for that we have to

investigate our client needs and, we have to make adjustments to

our project.

https://images.app.goo.gl/4JNufQ3

nUDDbap1b9 https://images.app.goo.gl/WPe4RR

XKQjnXZeJR7

DESIGN PROCESS

• For the design process we need consider

lot of factors

• Mainly we have to show them our

project low cost, Eco friendly and

Sustainable

In this work, we are preparing one design

diagram using different design software

and implementing low-cost techniques

such as compressed earth blocks, solar

panels and some other.

IMPLEMENTATION

• To make this construction as low cost

we have to implement to many

techniques

• For make the construction cost is low

We consider following techniques

 Using Earth blocks

 Using low density concrete

 Use eco friendly martial

 Using solar panels

 Use standard reusable materials

Great material for thermal mass

It’s non toxic

Bricks are easy to work with

Incredibly environmental friendly

Reduce building’s electricity cost

No maintenance

Fire resistant,

Thermal and acoustical insulation properties make it ideal

for a wide range of purposes

Low Cost

• To make any project with low cost we have to

follow lot of challenges

 Handling of materials

 Maintain the proper resources

 Maintain work flow

 Handling of people

 Adjusting design concepts

CHALLENGES

https://images.app.goo.gl/PWmgjU2QdnSKtbbx7

SOLUTIONS

• To make the cost of the project is low hear

we consider following materials

 Interlinking Blocks

 Barriers

 EPS Core Panels

 Tree Barriers

 Stone walls

 Glass in construction

https://images.app.goo.gl/7oXA1

RLnLWshpkig6 https://images.app.goo.gl/JEm

EKjiJbxm37jyV9 https://images.app.goo.gl/JEmEK

jiJbxm37jyV9

https://images.app.goo.gl/zww

yFAPcSzeGhexH9 https://images.app.goo.gl/qU

w53tadgt8kx6ku8

https://images.app.goo.gl/D8Mv

ZBWBDhLuU3zA7

Interlinking blocks Barrier EPS core Panels

Tree barriers Stone work walls Glass in Construction

PROJECT STATUS

The project status can be expressed in the following images

status

 Initiate : Hear our initiation of the project is to make

project is low cost and full fill the client needs.

 Plan : As per the client need we prepare the road map for

engaging the work.

 Design : To make our project in clear understanding we

made our own design and how to apply our thoughts in that

work.

 Construct : As per the client's needs, we construct our

work plan, elaborate the work to all standards and all

together make our project in success.

 Close: We hope we present the best out put client and

we feel satisfies all the requirements of the client.

https://images.app.goo.gl/38DxMncLW3warYct8

RISK MANAGEMENT / ANALYSIS

Source: https://images.app.goo.gl/mp1BbHbKTdHZDCzd8

For adjusting the client in the specified location, we

have to face a lot of risks, we need to do a risk

management plan as per the diagram we should do

the risk management plan.

DELIVERY

To deliver any project, we have to follow proper manner, for

that to follow the all the steps like

•To check the client's needs are done.

•To check the design standards are perfectly adjusted to the

client's specifications.

•To explain what we have done and where we have adjusted

client points.

MAINTENANCE

Maintenance is the process of ensuring that

buildings and other assets retain a good

appearance and operate at optimum

efficiency. Inadequate maintenance can

result in decay, degradation and reduced

performance and can affect heath and

threaten the safety of users, occupants and

others in the vicinity

OUR LOW COST CONSTRUCTION HOUSE

COMPARISON BETWEEN NORMAL HOUSE AND OUR LOW COST AND ECO FRIENDLY HOUSE

General House Low cost house

Regular use of material Using different materials

Design pattern is general Innovative designs used

Cost of the construction is standard

based of the price of the market

When combative general house the

cost of decreased 1/3

Damage of environmental is moderate Purely eco friendly

https://images.app.goo.gl/v1VR

vmdv8rJLiBjS6

https://images.app.goo.g

l/bywF4rMCE8cFzdZe8

https://images.app.goo.gl/S5r1TH3HqCYm

XXvP6

https://images.app.goo.gl/3hAE6X5ACDE

hFcsq9

CONCLUSION

To full the client needs we are adopted so many

techniques and process, if we follow the mentioned

processes in the required house it will definitely goes low

cost of constructions.

And what ever we suggest the techniques are

acceptable in ISO standards and practically provide.

THANK YOU