supply chain and operations management with excel
MGT 3332 Group Project
Operations & Supply Chain Management
Project Overview
Your team is to assume the role of Operations Manager for a pipe manufacturing company in the gulf coast area. You have been chosen by your plant manager to forecast the next years production for all four quarters. This will allow you to set production goals, a working budget, determine necessary inventory, and distribution for the next year. This project will have analytical, research, and report aspects. For the analytical portions you will need to submit an excel file in its original format (no PDFs). The report will summarize your work in a word document, in its original format. You will also prepare a presentation of your project. Online students will be able to present their projects online, with each student being responsible for a section. Hybrid students will present in class, or online during class meeting. To receive full credit, you must cite all sources using APA style and work cited. Ensure that your information is supported by reliable data presented in the correct format and do not present vague statements that do not follow a logical thought process. Your decisions, answers, and findings need to be based off your researched information, data, and correct modeling. You may not consult with other teams in this class or any other class for your project. The team with the best project will receive an additional 10 pts to their final exam. I may ask individual students to explain the reasoning for decisions in your report or explanation of the spreadsheets. Your report should be a minimum of 8 pages, not including you works cited page. The excel workbook should have multiple worksheets labeled in different colors representing the analytical portion. For your presentation, please prepare a PowerPoint. Do not forget to cite on your PowerPoint!
Project Deliverables You will need to research the cost of steel coils (hot or cold rolled) to determine your material cost. Use only reliable sources, Wikipedia is not a reliable source. Your team must determine what a reliable source is and cite your source. To forecast pipe production, you will need to evaluate the raw material cost from previous years. Use at minimum 20 years of raw material cost (hot or cold rolled steel); and other variables (iron ore/ oil) or any others you think will determine demand. You may use more year’s data if you choose. HINT! – You are forecasting demand for raw material(coils). Once you have sufficiently forecasted the raw material cost, you will need to plan operations to facilitate the increase or decrease of production in your facility. Please use the appropriate forecast and explain why you chose that specific model.
1. Determine if you should increase production or decrease and by how much? Based on the right forecast model. Use the past 20 years (2000- 2021) of Hot or Cold rolled steel prices at yearly interval averages to forecast cost. Specify hot or cold in your report.
a. Make sure to use an excel model to do your forecast. b. Research independent variables that affect the price of steel coils c. Use these independent variables to forecast the next year’s
production d. Explain the assumed relationship between the independent
variable and dependent variable. e. Summarize historical errors using MAD, MSE, or MAPE f. Use standard error of estimate to determine how accurate your
forecast is. g. Check for correlations and explain
2. Once you have completed your forecast, determine the cost of steel coils
for 2022.
Production Analysis
1. Once you have determined the forecasted price per ton for steel coils, you will need to determine if the forecasted cost will incentivize you to decrease or increase production. What would you increase or decrease production to?
2. If you choose to increase production, explain why and if your budget needs to be adjusted higher or lower for coil purchases and what the final cost would be?
3. Based on your decrease or increase determine your new yearly production.
4. Create a shift schedule based on your new production that will have one crew(a) (workers in all production areas) on 4 days, then the Next crew(b) on for 3 days. This will be a rotating schedule of the current workforce need in each area. (Overtime is 1.5 times the hourly rate after 40 hrs.)
5. Utilize the pay scale to determine labor cost for your forecast depending on the increase or decrease in production.
6. Given the labor, raw material, and work shift information, determine the total cost based on your forecast. This is your forecasted budget. (I have excluded some items and simplified for this project.)
7. What is your forecasted revenue? (Extra credit) Material 1 Rolled Steel Coil = 5,000 tons Current price per ton = $900 Estimated Steel Pipe Produced from 1 coil = 10,000 pieces of pipe Current Daily Production = 1,000 pipe per day Currently Yearly Production = 365,000 pieces Current number of steel coils used yearly = 37 Current budget for coil purchases – $166,555,000 Sales Pipe sales price = $1,800 (per unit)
Work Schedule is as follows for CURRENT PRODUCTION
Hours = 12hrs/ day (365 days)
Workdays per week = 7
Daytime shift only
To determine pay for employees use every two weeks’ pay structure. Start
January 1st.
For assignment purposes we assume no shutdowns or maintenance issues.
PAY SCALE
Supervisors pay = $45/hr.
Crane pay = $35/hr.
Operator pay = $35/hr.
Inspector pay = $30/hr.
IT technician pay = $25/hr.
Forklift Operator pay = $25/h
Grinder/ Cutter Pay= $20/hr.
Helper Pay = $15/hr.
Areas of Production
(assume employees needed for per shift, remember there is an A & B shift)
Slitter = 1 supervisor
Operator = 1
Helpers = 2
Crane Operator = 1
Forming = 1 supervisor
Operator = 2
Helpers = 4
Cutter = 1
QA/QC = 1 supervisor
Inspectors = 4
Helpers = 2
Grinders = 2
Yard = 1 supervisor
2 forklift operators
2 Helpers/Flaggers
IT = 1 technician
Supply Chain The storage yard at your facility currently has the capacity to hold 40 steel coils. It is important for you to maintain the appropriate amount of inventory for production. Remember assuming production is constant 365days. Based off your forecast, determine if you will need to increase or decrease storage capacity for your facility; then add a 20% increase in coil inventory to cover scrap and mistakes. Based off your forecasted demand of coils annually, determine the fixed order size. The annual holding cost is 1,000 per coil and 2,500 to process an order. (Use appropriate economic order model) How many times per year do you need to reorder? What is your total carrying and ordering cost? What is the length of your ordering cycle? Develop a logistics plan based the following information. Determine which route is the best route. Explain your answer and express your cost structure in an excel table. Assume the following: Your location = Houston, TX Distribution Center A = Corpus Christi, TX Distribution Center B = Fairfield, AL Distribution Center C = Chicago, IL Gas = $3.50/gal Trucking mileage cost = .66 per mile Driver hourly rate = 35/ hr.
Project Outline Title Page
Project Name, Team Members First & Last Name (alphabetically listed), Class, Section Number, Class Day & time or online only.
Introduction In the introduction describe who you are and what your role as
Operations Manager encompasses for this project. Utilize the information provided and the chapter learnings to give a complete description. This part must be done in relation to this course and what you have learned. Treat the introduction as your presentation of information to executives. Include elements of what your goals are. You may expand on the information provided.
Operations
I provided you with questions that need to be answered in this section. Please answer the questions in report format. Do not list the answers. Formulate your responses with supported evidence and logical answers based off your analysis. You may add additional information.
Supply Chain Follow the above operations instructions.
Conclusion
You conclusion will summarize Operations and Supply Chain. To conclude organize your findings by stating what goals you expect to reach, necessary budget, and other forecasted determinates. The idea here is to have the above two separate elements come together to describe facility management for the next year based off these components. If you added anything additional remember to report here.
Work Cited
You must include a work sited page. APA format. Perdue Owl is acceptable. Remember, Cite, Cite, Cite! Even if form the textbook or paraphrasing. A good rule is, if it was not your original though, you must cite it properly formatted. You will turn the report in using Turnitin. Turnitin is very good at recognizing plagiarism. Please Cite all sources in your document and on works cited page. Evidence of plagiarism will be evaluated; accordingly, up to receiving a zero for the assignment and subject to university policy.
Report Format & Project Submittal
Report Format
Follow the report format provided for you with headings. You may not exclude any portions. Us 12-point New Times Roman font and 1-inch margins. You may use a footer for page numbers of standard size. Your paper should be double spaced with no excessive spaces between headings. You may use subheadings or additional headings if you feel they are necessary. Use proper paragraph form The paper should be at least 7-8 pages long, excluding the works-cited page. Do not include unnecessary words and phrases to extend your paper. This is a business report.
PowerPoint Format For your PowerPoint presentation, remember to cite on each slide when necessary. At the end of your presentation include your citations. You are free to use the font you choose as long as it is legible. Please include a title page with all team members first and last name. Use the notes section to annotate your presentation. Proofread!!!! Grammar, syntax, usage formatting errors will be penalized.
Excel
For your data analysis, please have separate worksheets of the workbook for each model, schedule, or solution. Name each worksheet and have it color coded. On the first sheet of the workbook separate from the data sheets have all team members names. All documents must be submitted in their original format. No pdf’s or pictures will be accepted.
Submission I will have a submission folder for your projects under course content. Only one person will submit all documents for the entire group. You will submit the report separate under the Turnitin link. If you do not do this step, you will not receive credit for this portion. The complete project including report, will be submitted as a zip file, depending on size to the team project submission folder. Late reports will be accepted, but at a severe penalty. I suggest keeping one folder that all teammates can access. If the student who is to submit the project does not, some ones else can. It still needs to be only one person submitting. I have multiple papers and projects to grade in different classes. In the project folder I will add a project evaluation/ rubric, so you can see how grading will be conducted. There will also be a peer review added. You will complete and submit separately in another submission folder at the conclusion of the project, due the same day as project. If someone is not equally contributing, you may review in the peer review section and their grade will be reflected if they can not provide evidence to the contrary. Each student should document their contribution to the group. I would suggest keeping your original notes, excel file, word doc, ppt that is tied to your ms account. I will not get involved in your group dynamics. If someone refuses to participate, then they will receive a zero. Unless a conflict is severe, you need to work together.
Projects will be due by November 17th 11:59pm.
Presentations will start the week of November 29th. I will notify you.