Process Flowchart Drawing
MGT 3323: Production and Operations Management
Module 4 Assignment: Process Flowchart Drawing Guidelines and Rubric Overview: For this assignment, you will practice drawing a process flowchart. A process flowchart provides a visual representation of the steps in a process. Constructing a flowchart is often one of the first activities of a process improvement effort, because it provides a clear understanding of the process and flow of resources, helps to identify non-value-added operations, and facilitates teamwork and communication (the flow of information and people). Directions: To complete this assignment, refer to problem 3 in the “Problems and Activities” section at the end of Chapter 7 in your text. Then, complete the following:
● Draw a flowchart for a process of interest to you, such as a quick oil change service, a factory process you might have worked in, ordering a pizza, renting a car or truck, buying products on the internet, or applying for an automobile loan. You must include a legend to accompany your process flowchart.
● Identify the points where something (people, information) waits for service or is held in work-in-process inventory, the estimated time to accomplish each activity in the process, and the total flow time. Remember that each decision symbol must have at least two direction arrows to accompany it.
● Evaluate how well the process works and what might be done to improve it.
Guidelines for Submission: Your assignment should be submitted as a Microsoft PowerPoint file. Instructor Feedback: This activity uses an integrated rubric in Blackboard. Students can view instructor feedback in the Grade Center.
Rubric Criteria Exemplary (100%) Needs Improvement (75%) Not Evident (0%) Value
Flow Chart
Submission includes a drawing of a flowchart with a legend.
Submission includes a drawing of a flowchart, but may lack in detail or be missing a legend.
Submission does not include a flowchart drawing with legend.
50
Process Flow Activities
Identifies the points where something (people, information) waits for service or is held in work-in-process inventory, the estimated time to accomplish each activity in the process, and the total flow time. Each decision symbol has at least two direction arrows to accompany it.
Identifies some, but not all of the following: the points where something (people, information) waits for service or is held in work-in-process inventory, the estimated time to accomplish each activity in the process, and the total flow time. Or, each decision
Does not identify the points where something (people, information) waits for service or is held in work-in-process inventory, the estimated time to accomplish each activity in the process, or the total flow time. Each decision symbol does not have two direction arrows to accompany it.
20
MGT 3323: Production and Operations Management
symbol may not have two direction arrows to accompany it.
Evaluation
Evaluates how well the process works and what might be done to improve it.
Evaluates how well the process works and what might be done to improve it, but lacks clarity.
Does not evaluate how well the process works or what might be done to improve it.
30
Total = 100 %