Short assignments
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
Chapter 1:
Introduction to Operations
1-2
Chapter 1 Learning Objectives
•LO 1.1 Define operations and supply chain management.
•LO 1.2 Review the role of operations in the firm and the economy.
•LO 1.3 Describe the five main decisions made by operations and supply chain managers.
•LO 1.4 Explain the nature of cross-functional decision making with operations.
•LO 1.5 Describe typical inputs and outputs of an operations transformation system.
•LO 1.6 Analyze trends in operations and supply chain management.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
1-3
Definition of Operations Management
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
Operations management focuses on decisions for the
internal production of the firm’s products or services.
1-4
A Typical Supply Chain (Figure 1.1)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
1-5
Operations and Supply Chain Management
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
Deals with the sourcing, production, and distribution of the
product or service along with managing the relationships with
supply chain partners.
1-6
Importance of Operations and Supply Chain
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
Providing the products and
services that we use and enjoy
Constantly improving both productivity and
innovation
Sustaining our way of life while
working to protect the planet
Creating revenue from products & services to drive firm profitability
1-7
Role of Operations in the Economy
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
Gross Domestic Product (GDP) - monetary value of all goods and services produced in a country.
Productivity - value of goods/services output, relative to input.
Productivity = output capital + labor
1-8
Productivity Example
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
A retail (quick) clinic has the following output (revenue) and labor expenses. Did productivity improve from Year 1 to Year 2? (assume equivalent capital costs)
Annual Year 1 Year 2 Inflation
Output (revenue) $thousands $842 $883 2% Labor $thousands $280 $292 4%
1-9
Productivity Example - Solution
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
A retail (quick) clinic has the following output (revenue) and labor expenses. Did productivity improve from Year 1 to Year 2? (assume equivalent capital costs)
Productivity year 1 = Output year 1 = 842 = 3.01 Labor year 1 280
Productivity year 2 = Output year 2 = 883(.98) = 3.09 Labor year 2 292(.96)
Change in productivity = 3.09 = 1.027 which is a 2.7% increase 3.01
1-10
Why Study Operations Management?
Challenging and interesting career opportunities – domestic, international
Cross-functional nature of decisions – what every major needs to know
Principles of process thinking can be applied across the organization
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
ammentorp/123RF
1-11
Careers in Operations and Supply Chain Management
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
Supply Chain Analyst
Supply Chain Analytics
Plant Lead on Sustainability
Sourcing Specialist
Global Sourcing Analyst
Transportation Planner
Risk Consultant
Customs Specialist NetPics/Alamy Stock Photo
1-12
3 Aspects of Operations and Supply Chain Management
Decisions:
The operations manager must decide: • Process, quality, capacity, inventory, and supply chain
Function:
Major functional areas in organizations: • Operations, marketing, finance
Process:
Planning and controlling the transformation process and its interfaces (internal/external)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
1-13
Let’s Manage Operations at Pizza USA!
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
Managing operations is about making decisions.
Steve Mason/Getty Images
1-14
Major Decisions at Pizza USA
Process ◦ How should we produce pizzas?
Quality ◦ How do we meet quality standards and ensure a good customer experience?
Capacity ◦ How much output do we need at various times?
Inventory ◦ Which ingredients, when & how much?
Supply Chain ◦ How to source inputs and manage logistics?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
1-15
Framework for Operations Decisions (Figure 1.2)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
1-16
Cross-Functional Decision Making
Operations is critical in every firm.
Marketing = create demand
Operations = produce and distribute goods and services
Finance = acquire and allocate capital
Supporting functions: human resources, information systems, accounting
Cross-functional decision making - see Table 1.2
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
1-17
Operations as a Process
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
Transformation (Conversion)
Process
Inputs Outputs
1-18
Operations as a Process (Figure 1.3)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
Transformation (Conversion)
Process
Energy Materials
Labor Capital
Information
Goods or Services
Feedback information for control of process inputs and process technology
1-19
Transformation Process Examples (Table 1.3)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
1-20
Trends in Operations and Supply Chain Management
▪ Sustainability – triple bottom line
▪ Services
▪ Digital Technologies
▪ Integration of Decisions Internally and Externally
▪ Globalization of Operations and the Supply Chain
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
StreetVJ/Shutterstock
1-21
Chapter 1 Summary
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
•LO 1.1 Define operations and supply chain management.
•LO 1.2 Review the role of operations in the firm and the economy.
•LO 1.3 Describe the five main decisions made by operations and supply chain managers.
•LO 1.4 Explain the nature of cross-functional decision making with operations.
•LO 1.5 Describe typical inputs and outputs of an operations transformation system.
•LO 1.6 Analyze trends in operations and supply chain management.
1-22
Questions for Discussion
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
•What do you hope to learn in this course?
•Review the operations and supply chain trends on slide 1-20. Which of these is most interesting to you and why?
•What production systems have you seen in person? How do they produce the intended product or service?
•Describe a transformation process that you recently experienced. Think about a medical or dental clinic visit, or a restaurant visit.
•Why are global factors important in operations and supply chain?
•How is operations and supply chain related to environmental responsibility?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
Chapter 2:
Operations and Supply Chain Strategy
McGraw-Hill Education
2-24
Chapter 2 Learning Objectives
LO 2.1 Define operations strategy.
LO 2.2 Describe the elements of operations strategy and alignment with business and other functional strategies.
LO 2.3 Differentiate the ways to compete with operations objectives.
LO 2.4 Compare product imitator and innovator strategies.
LO 2.5 Explain the nature of global operations and supply chains.
LO 2.6 Analyze two types of supply chain strategies.
LO 2.7 Illustrate how operations and supply chain can become more sustainable.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
2-25
Operations Strategy
“A consistent pattern of business decisions for operations and the associated supply chain …
… that are linked to the business strategy and other functional strategies, leading to a competitive advantage for the firm.”
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
The operations strategy at Southwest Airlines includes using only one type of airplane.
This lowers staff training and maintenance costs, and reduces on hand spare parts.
These decisions support the business strategy of being a low cost carrier.
Markus Mainka/123RF
2-26
Operations Strategy Process (Figure 2.1)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
Mission
Objectives: (cost, quality, delivery, flexibility, sustainability)
Strategic Decisions: (process, quality, capacity, inventory, supply chain)
Distinctive Competence
Operations Strategy Functional strategies in
marketing, finance,
engineering, human resources,
and information systems
Corporate strategy
2-27
Operations Strategic Objectives
Cost – resources used
Quality – conformance to customer expectations
Delivery – quickly and on time
Flexibility – ability to rapidly change operations
Sustainability – environmental, social, economic
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
What trade- offs exist among the objectives?
How do firms use these
objectives to gain
competitive advantage?
2-28
Examples of Important Strategic Decisions in Operations (Table 2.2)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
2-29
Distinctive Competence
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
This operations capability is something an organization does better than any competing organization that adds value for the customer.
Examples:
• patents, proprietary technology, operations innovations
2-30
Linking Operations to Business Strategy
Business strategy alternatives ◦ Product Imitator
◦ Operations must focus on keeping costs low.
◦ Product Innovator ◦ Operations must maintain flexibility in processes, labor, and suppliers.
Customer perspective ◦ Order Qualifier
◦ Objective that must be delivered at an acceptable level for customer to consider product/service. Can be an order loser if not met.
◦ Order Winner ◦ Objective that causes customer to choose a particular product/service.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
2-31
Linking Operations to Business Strategy
◦ Product Imitator ◦ Order Winner = price (low cost)
◦ Order Qualifiers = flexibility, quality, delivery
◦ Product Innovator ◦ Order Winner = flexibility (rapid introduction of new products)
◦ Order Qualifiers = cost, delivery, quality
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
2-32
Example: McDonald’s Operations Strategy
Mission fast product/service, consistent quality, low cost, clean/friendly environment
Operations Objectives cost, quality, service
Strategic Decisions process, quality, capacity, inventory, supply chain
Distinctive Competence today: continuous improvement of the transformation system, and brand (originally: unique service/supply chain)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
2-33
Characteristics of “Global Corporations”
Facilities located worldwide, not country by country.
Products & services can be shifted among countries.
Sourcing on a global basis.
Supply chain is global in nature.
Product design & process technology are global.
Products/service fit global tastes.
Demand is considered on worldwide basis.
Logistics & inventory control is on worldwide basis.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
2-34
Supply Chain Strategy
To achieve competitive advantage for entire supply chain, rather than individual entities.
Two supply chain strategies: ◦ Imitative Products (e.g. commodities)
◦ Predictable demand ◦ Efficient, low-cost supply chain
◦ Innovative Products (e.g. new technologies) ◦ Unpredictable demand ◦ Flexible, fast supply chain
Firms design supply chain for each product/service or group of products/services ◦ Avoid “one size fits all” strategy
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
2-35
Supply Chain Strategy (Table 2.4)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
2-36
Sustainability is in Operations
Operations Sustainability:
* minimizing or eliminating environmental impact of operations
* social and financial viability of the firm for future generations
Operations ‘greening’ may include: ◦ Curtailing air, water, landfill pollution
◦ Reducing energy consumption
◦ Minimizing transportation and total carbon footprint
◦ Working with suppliers to use recyclable and biodegradable packaging
◦ Incorporating product reuse, end-of-life return, recycling
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
British retailer Marks & Spencer has met goals to send zero waste to landfills and is the first major retailer to be carbon neutral.
Supply chain partners have been an important source of support for this effort.
TEA/123RF
2-38
Chapter 2 Summary
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
LO 2.1 Define operations strategy.
LO 2.2 Describe the elements of operations strategy and alignment with business and other functional strategies.
LO 2.3 Differentiate the ways to compete with operations objectives.
LO 2.4 Compare product imitator and innovator strategies.
LO 2.5 Explain the nature of global operations and supply chains.
LO 2.6 Analyze two types of supply chain strategies.
LO 2.7 Illustrate how operations and supply chain can become more sustainable.
2-39
Questions for Discussion
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
•Describe operations strategy in your own words.
•What is the relationship between a firm’s business strategy and its operations strategy?
•Think of examples of manufacturing and service firms that pursue the operations objectives of cost, quality, delivery, flexibility, sustainability.
•How do Apple’s operations and supply chain characteristics support their product innovator strategy?
•What are some operations or supply chain challenges facing global corporations?
•Describe recent examples you have seen in person or in the media that illustrate how operations is closely tied to environmental, social, and financial sustainability.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 3-40
Chapter 3:
Product Design
McGraw-Hill/Irwin
Chapter 3 Learning Objectives
LO 3.1 Compare the three strategies for new product introduction.
LO 3.2 Describe the three phases of new product development.
LO 3.3 Evaluate how concurrent engineering deals with misalignment.
LO 3.4 Describe the criteria for selecting suppliers for collaboration.
LO 3.5 Evaluate an example of Quality Function Deployment.
LO 3.6 Explain the benefits of modular design.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 3-41
McGraw-Hill/Irwin
Product Design: Why Does Operations Care?
In the past: Throw product design “over the wall”
Today: ◦ Must be able to produce the product (design the process)
◦ technology
◦ availability of resources
◦ Must have the right type and amount of capacity
◦ Must deliver a quality product or service
◦ Must have right inventory at right time
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 3-42
The LEGO Group is investing over $100 million and hiring 100 workers to redesign its product.
The goal is to make the product entirely from plant or recycled materials by 2030.
Milosh Kojadinovich/12RF
McGraw-Hill/Irwin
Strategies for New Product Introduction
Market Pull: “Make what we can sell” ◦ Organize resources to fulfill customer demand ◦ Food industry
Technology Push: “Sell what we can make” ◦ Develop superior technologies and products ◦ Electronics
Interfunctional View: most difficult ◦ Cross-functional design team – marketing, engineering, operations, finance ◦ Challenge to gain cooperation of all functions ◦ Consider existing and new markets
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 3-43
McGraw-Hill/Irwin COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC.
ALL RIGHTS RESERVED. 3-44
McGraw-Hill/Irwin
New Product Development Process
Concept Development ◦ Idea generation and evaluation of alternative ideas
Product Design ◦ Design of the physical product
◦ Design of the production process
Pilot Production/Testing ◦ Testing production prototypes (e.g., 3D printing)
◦ Finalizing production process
◦ Finalizing ‘information package’ specifying product and process design details
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 3-45
Shutterstock/Gorodenkoff
McGraw-Hill/Irwin
New Product Design Process (Figure 3.2)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 3-46
Pilot production/testing Final process design
Preliminary process design
Concept development
Product design
McGraw-Hill/Irwin
Production Prototypes
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 47
3D Printing or Additive Manufacturing
- Creates physical prototype - Allows rapid production of prototype designs - Software and hardware continue to improve - Now possible to print metal and human cells - Speeds entire product design process
Robert Clark/Getty Images
McGraw-Hill/Irwin
Cross-Functional Product Design
Sequential approach ◦ Functions (marketing, engineering, operations) work independently
before passing work to next step. This is the ‘over the wall’ approach. ◦ Often results in misalignment of market needs, design, and production
process.
Concurrent approach ◦ Also called concurrent engineering. ◦ Functions cooperate, work together over the same time frame. ◦ Cross-functional teams are common. ◦ Not always “best” approach (e.g. high uncertainty of market or
technology).
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 3-48
McGraw-Hill/Irwin
Cross-Functional Product Design (Figure 3.3)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 3-49
McGraw-Hill/Irwin
Supply Chain Collaboration
Relationships with Customers ◦ Ask right questions ◦ Align incentives to share knowledge ◦ Create collaborative technology platform ◦ Include as advisors to design team
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 3-50
McGraw-Hill/Irwin
Supply Chain Collaboration
Relationships with Suppliers ◦ Technical expertise
◦ Capabilities – cost, time, quality targets
◦ Capacity availability
◦ Low risk
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 3-51
McGraw-Hill/Irwin
Quality Function Deployment (QFD)
“House of Quality”
Tool for coordinating and communicating between functions
Helps identify tradeoffs
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 3-52
Engineering Characteristics
“Voice of the Engineer”
Customer Attributes
“Voice of the Customer”
McGraw-Hill/Irwin
House of Quality (QFD) (Figure 3.4)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 3-53
McGraw-Hill/Irwin
HOUSE OF QUALITY (QFD)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 3-54
House of Quality (QFD) (Figure 3.5)
McGraw-Hill/Irwin
HOUSE OF QUALITY (QFD)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 3-55
QFD for Pizza USA Delivery (Figure 3.6)
McGraw-Hill/Irwin
Modular Design
Allows greater product variety through ‘mixing and matching’ modules
Design, develop, and manage basic components (modules) to (re)use in multiple products
Controls costs while enabling customer choice
Small number of components creates large number of combinations, e.g., Dell notebooks, IKEA cabinets
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 3-56
McGraw-Hill/Irwin
Modular Design
MINI Cooper’s basic model has many choices:
◦ 4 body colors
◦ 3 wheel designs
◦ 8 interior finishes
◦ 2 engines
◦ 11 styles
The theoretical number of different cars that can be produced:
4 × 3 × 8 × 2 × 11 = 2112
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 3-57
Most automobile manufacturers use modular design.
Robert Wilson/123RF
McGraw-Hill/Irwin
Chapter 3 Summary
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 3-58
LO 3.1 Compare the three strategies for new product introduction.
LO 3.2 Describe the three phases of new product development.
LO 3.3 Evaluate how concurrent engineering deals with misalignment.
LO 3.4 Describe the criteria for selecting suppliers for collaboration.
LO 3.5 Evaluate an example of Quality Function Deployment.
LO 3.6 Explain the benefits of modular design.
McGraw-Hill/Irwin
Questions for Discussion
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 59
•Can you think of examples of new products that did not function well for the customers who bought them? What went wrong?
•Describe what can happen if product design and process design are approached separately by different work teams.
•What are the key activities in pilot production?
•What do you know about 3D printing? 4D printing?!
•What do marketing, finance, and HR do when they are involved in a cross- function concurrent engineering team?
•How can suppliers be involved in new product development?
•Can you think of products you own that include modular design elements?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-60
Chapter 4:
Process Selection
McGraw-Hill Education
Chapter 4 Learning Objectives
LO 4.1 Contrast and compare the five types of product-flow processes.
LO 4.2 Describe the differences among order fulfillment processes.
LO 4.3 Explain how companies should make process selection decisions.
LO 4.4 Correctly place examples of products on the product-process matrix.
LO 4.5 Describe the features of focused operations.
LO 4.6 Discuss the uses of mass customization and 3D printing.
LO 4.7 Contrast pollution prevention, pollution control and pollution practices.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-61
Product-Flow Characteristics
Types of Product Flow ◦Continuous process
◦Assembly line ◦Batch flow ◦Job shop ◦Project
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-62
Product-Flow Characteristics: Continuous Process Highly standardized and automated
Flexibility limited
High volumes of production
Commodity products
Low cost is the ‘Order Winner’
Process industries (sugar, paper, oil, electricity, etc.)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-63
Product-Flow Characteristics: Assembly Line
Linear sequence of operations (often paced)
Large capital investment, use of automation
Very efficient
High-volume, standardized products
Low flexibility to product and volume changes
Discrete products (autos, appliances, computers, etc.)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-64
nikitabuida/Shutterstock
Assembly Line: Metal Bracket (Figure 4.1)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-65
paintdrill bend
Task or work station
Product flow
cut
Product-Flow Characteristics: Batch Flow
Production of batches or lots
Batches flow as a unit (set) from one work center to another
Process layout of work centers (by tasks)
Flow is jumbled and intermittent
Flexible labor and equipment (general purpose)
Low to high volume, variety of products
Many types of products (furniture, dishes, boats)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-66
Batch Flow: Metal Brackets (Figure 4.2)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-67
Cut Paint
Task or work station Product flows
Bend
Drill
Batch A Batch B Batch C
Product-Flow Characteristics: Job Shop
Customized to customer order
Production of small batches or lots
Layout/flow similar to Batch Flow
Flexible labor and equipment (general purpose)
Many types of made-to-order products (plastic parts, machine components, sheet metal parts, custom signs, artificial limbs, etc.)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-68
Product-Flow Characteristics: Project Production of customized single products
Labor and materials brought to site
Planning, scheduling challenges
Little automation, general purpose equipment
Highly skilled and flexible labor
Unique, one of a kind products (bridges, building construction, large aircraft, etc.)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-69
Throughput Ratio: Process efficiency
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-70
TR = Total processing time for the job
Total time in operations X 100%
Typically:
90-100% in continuous process & assembly line
10-20% in batch flow & job shop
Order Fulfillment
Make-to-Stock (MTS)
Make-to-Order (MTO)
Assemble-to-Order (ATO)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-71
Make-to-Stock (MTS) •Produce finished goods according to production schedule
•Customer buys from inventory
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-72
Disadvantage Inventory holding costs, slower to respond to changes in customer preferences
Advantage Faster fulfillment of customer demand, lower cost, smooth production rate
Make-to-Stock (Figure 4.3)
Customer
Production
Product Customer
order
Product
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-73
Finished goods inventory
Forecast orders
MTS Performance Measures Service level (orders filled when requested)
Inventory replenishment time
Inventory turnover (sales/avg. inventory)
Capacity utilization
Time to fill back order
Others, such as shrinkage rate
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-74
Make-to-Order (MTO) Start production after customer orders
No finished goods inventory
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-75
Disadvantage Intermittent production (i.e., lumpy demand pattern), slower response to customer demand
Advantage Higher flexibility to customize order; no finished goods inventory costs
Make-to-Order (Figure 4.3)
Customer
Production
Product
Customer order
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-76
MTO Performance Measures
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-77
Lead time
Orders completed on time (%)
Customer request date
Promise date
Assemble-to-Order (ATO)
Produce parts and subassemblies (modules); complete production when customer places order
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-78
Advantage Less finished goods inventory, faster fulfillment of customer order
Disadvantage Work-in-process inventory
Assemble-to-Order (Figure 4.3)
Customer
Production of subassemblies
Product Customer
order
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-79
Order assembly
Forecast orders
Holding inventory of subassemblies
MTS and MTO Comparison
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-80
Order Penetration Point (Figure 4.4)
DistributionAssemblyFabricationRaw materials
MTO MTO ATO MTS
∇----------∇ ∇ ∇
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-81
Process Selection Decisions
Factors affecting process choice ◦ Market conditions
◦ Capital requirements
◦ Availability and cost of labor
◦ Technology options
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-82
Produce when?Produce how? Continuous process
Assembly line Batch flow Job shop Project
MTS MTO ATO
Process Characteristics Matrix (Table 4.2)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-83
Product-Process Strategy
Strategy must consider: ◦ Product characteristics
◦ Process capabilities
Product life cycle: ◦ Often begins in Job shop, then Batch flow, then Continuous/Assembly line.
Example: ◦ Bread was first produced by hand in individual units in traditional bakeries. It
is now produced in very large batches in modern automated bakeries.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-84
Product-Process Matrix (Figure 4.5)
Low volume, low standardization
Printing
Heavy equipment
Auto assembly
Sugar refinery
Low volume, multiple products
Higher volume few major products
High volume, high standardization, commodity
Job Shop
Batch
Assembly Line
Continuous NONE
NONE
Unique, one of a kind product
Project Building
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-85
Focused Operations Focused factory: Meeting one set of goals.
Plant-within-a-plant (PWP): Separate products/services with differing
goals by production lines/areas within the same facility.
Lack of focus = attempting to meet too many goals at one plant or facility.
Signs of declining focus = product/service proliferation, different volumes,
different levels of standardization.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-86
Example: Midwest Orthopedic Specialty Hospital (Milwaukee, WI) specializes in medical treatments on bones and joints.
Mass Customization
•Strategy to produce products in lot sizes = 1, high volume.
•Flexible manufacturing provides economies of scope.
•Traditional mass production provides economies of scale.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-87
Produce custom products using a high volume process economies of scale = low unit cost economies of scope = high variety
Forms of Mass Customization
Modular production & assemble-to-order (ATO) ◦ e.g., assembling modules for Dell computers
Fast changeover ◦ e.g., zero set-up time at Motorola
Postponement of options ◦ e.g. power supply for Hewlett-Packard printers
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-88
3D Printing & Additive Manufacturing
Based on digital design model ◦ Stored in cloud, in not warehouse!
Layer plastic, metal, ceramic to build object ◦ Normal (real) size
◦ Complex shapes and spaces
Uses: medical implants, aerospace, spare parts, etc. ◦ Complements manufacturing for special needs, rather than
replacing production facilities
◦ Can shorten global supply chain; reduce inventory
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-89
cookelma/Getty Images; Maruna Skoropadska/123RF
Environmental Concerns
Technologies for pollution prevention.
Technologies for pollution control.
Infrastructure Systems for pollution practices.
Other concerns • Recycling outputs
• Recycled inputs
• Remanufacturing
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-90
Cross-Functional Decision Making
Marketing wants fast response to customer demand
Finance provides funds to configure the process
HR finds/creates the properly skilled workers
IT serves various data requirements
Accounting evolves in setting performance measures
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-91
Who has a stake in process choice?
Chapter 4 Summary
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-92
LO 4.1 Contrast and compare the five types of product-flow processes.
LO 4.2 Describe the differences among order fulfillment processes.
LO 4.3 Explain how companies should make process selection decisions.
LO 4.4 Correctly place examples of products on the product-process matrix.
LO 4.5 Describe the features of focused operations.
LO 4.6 Discuss the uses of mass customization and 3D printing.
LO 4.7 Contrast pollution prevention, pollution control and pollution practices.
Questions for Discussion
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 4-93
•In your own words, describe the advantages of each of the product flows: continuous, assembly line, batch, job shop, and project.
•Let’s say you are starting a new company that manufacturers customized jewelry. What types of process equipment will you search for? What types of workforce skills will you want?
•For your jewelry company, how will you decide between make-to-stock, make- to-order, and assemble-to-order?
•Can you think of examples where you have seen processes that are assemble- to-order?
•On the product-process matrix, why are there no firms in two of the corners?
•Have you purchased any mass customized products? Try to determine how you think they were made.
•What examples have you seen of organizations using pollution prevention, pollution control, or other pollution practices?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 5-94
Chapter 5:
Service Process Design
McGraw-Hill Education
Chapter 5 Learning Objectives
LO 5.1 Differentiate the characteristics of a service organization from a manufacturing organization.
LO 5. 2 Explain the elements of a service-product bundle.
LO 5.3 Organize a variety of service offerings into the service delivery system matrix.
LO 5.4 Describe the effect on the service delivery system of customer contact.
LO 5.5 Explain service recovery and service guarantees.
LO 5.6 Evaluate the role of technology in service management.
LO 5.7 Appraise how globalization has affected services.
LO 5.7 Define the attributes of the service-profit chain.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 5-95
The Service Economy
Source: Government Accountability Office, 2019
15 Largest U.S. employers
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 5-96
2010 3 manufacturers
12 services
1960 12 manufacturers
3 services X
The Service Economy
Source: Bureau of Labor Statistics, 2019
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 5-97
Defining Service
Intangibility of the offering
Simultaneous production and consumption
No finished goods inventory
Front office vs. back office
Cannot be stored/resold
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 5-98
Leonard Zhukovsky/123RF
Service-Product Bundle
Service - explicit service ◦ what the provider does for customer
Psychological benefits - implicit service ◦ how customer feels after service
Physical goods - facilitating goods ◦ used during service or received by customer
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 5-99
Pizza delivery
Pizza
Speed/ convenience
Delivery vehicle
Enjoyment
Goods and Services Packages (Figure 5.1)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 5-100
100% 75% 50% 25% 0% 100%75%50%25%
Self-service groceries
Automobile
Installed carpeting
Fast-food restaurant
Gourmet restaurant
Auto maintenance
Haircut
Consulting services
Goods Services
Service Delivery System
Matrix (Figure 5.2)
Standard with options, using moderately repeatable
sequence.
Customer has some decision-making power.
Co-routed •Stock brokerage
Provider Routed •ATM
Standardized with highly repeatable process
sequence.
Customer has low decision-making power.
Highly customized with unique process sequence.
Customer has great decision-making power.
Customer Routed •Estate planning
Many process pathways.
Jumbled flows,
complex work with
many exceptions.
Moderate number of
process pathways.
Flexible flows with some
dominant paths, moderate work
complexity.Limited number of
process pathways.
Line flows, low
complexity work.
S er
vi ce
D el
iv er
y S
ys te
m D
es ig
n
Customer Wants and Needs in the Service Package
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
5-101
Customer Contact Extent of interaction between
service organization and customer.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 5-102
Lower contact (buffered core)
…
“provider-routed” (standardized)
…
Example online shopping
Higher contact (reactive system)
…
“customer routed” (customized)
…
Example dentist appointment
Customer Contact (see Figure 5.3)
Low customer contact
◦ Higher production efficiency
◦ Lower sales opportunity
◦ Workers with technical skills
◦ Focus on routing methods
◦ Office automation
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 5-103
Balancing sales opportunity and production efficiency
High customer contact
◦ Lower production efficiency
◦ Higher sales opportunity
◦ Workers with diagnostic skills
◦ Focus on client mix
◦ Client/worker teams
Customer-Introduced Variability Arrival
◦ Uncertainty in when customers will arrive to consume a service
Request ◦ Uncertainty in what customers ask for in the service-product bundle
Capability ◦ Uncertainty in the ability of customers to participate in a service
Effort ◦ Uncertainty in the willingness of customers to perform appropriate actions
Subjective preference ◦ Uncertainty in the customer’s intangible preferences in how service is carried
out
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 5-104
Service Failure / Service Recovery
◦ Taking swift and appropriate action to compensate customer
for a failed service.
◦ Fly in customer’s soup New bowl of soup plus free dessert!
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 5-105
UPS recovered from a service failure by not only delivering the package, but bringing flowers, chocolates, and doggy treats as well!
roberto galan/123RF
Service Guarantee
Benefits to the customer
◦ Promise of service to be delivered
◦ Payout to customer if promise not delivered
◦ FedEx package delivery On time, or it is free!
Benefits to the organization
◦ Focuses on customer (service promise)
◦ Clearly defines payout
◦ Improves customer loyalty
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 5-106
Technology – Artificial Intelligence
◦ Routine – repetitive tasks Example: conversational phone bots provide customer service
◦ Analytical – problem solving and learning Example: sports data analytics for player recruiting decisions
◦ Intuitive – think creatively Example: helping doctors diagnose patients
◦ Empathetic – respond emotionally Example: bot Pepper welcomes and amuses
Japanese bank customers
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 5-107
Software and hardware programmed to exhibit human intelligence
VTT Studio/Shutterstock
Globalization: Outsourcing & Offshoring Services
Outsourcing: ◦ An outside firm performs service activities such as workforce recruiting,
payroll management, accounting services, and call center functions.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 5-108
Offshoring: ◦ Export of these service activities to other countries.
Advantages: • Lower costs • Focus on core competencies
Disadvantages: • Coordination costs • Loss of direct control
Service Profit Chain (Figure 5.4)
Internal service quality drives…
Employee satisfaction drives…
Employee retention & productivity drives…
External service value (to customer) drives…
Customer satisfaction drives…
Customer loyalty drives…
Revenue growth & profitability ◦ Feed investment back into internal service quality
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 5-109
Chapter 5 Summary
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 5-110
LO 5.1 Differentiate the characteristics of a service organization from a manufacturing organization.
LO 5. 2 Explain the elements of a service-product bundle.
LO 5.3 Organize a variety of service offerings into the service delivery system matrix.
LO 5.4 Describe the effect on the service delivery system of customer contact.
LO 5.5 Explain service recovery and service guarantees.
LO 5.6 Evaluate the role of technology in service management.
LO 5.7 Appraise how globalization has affected services.
LO 5.7 Define the attributes of the service-profit chain.
Questions for Discussion
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 5-111
•Which service firms do you think are among the largest of all U.S. employers?
•What type of education and training are needed to fill the fastest growing occupations in the U.S.?
•Define the elements in the service-product bundle for your most recent service purchase.
•Can you think of examples of customer-routed, co-routed, and provider- routed services?
•How do firms decide if a service should be delivered in a high contact manner or a low contact manner?
•What was the outcome the last time you experienced a service failure?
•What ideas do you have for using artificial intelligence in the future?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 112
Chapter 6:
Process-Flow Analysis
McGraw-Hill Education
Chapter 6 Learning Objectives LO 6.1 Describe process thinking and system boundaries.
LO 6.2 Explain how the process view of business is cross-functional.
LO 6.3 Construct a process flowchart for a given process.
LO 6.4 Analyze a process by asking a wide variety of questions informed by the process flowchart.
LO 6.5 Calculate process-flow capabilities using analytics.
LO 6.6 Explain the principles of process redesign.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-113
Process Thinking All work is a process.
All business functions use processes.
System: Collection of interrelated elements where…
Whole system > Sum of parts Apply systems thinking to business.
Define system boundaries
Use cross-functional teams for systems analysis. Include all affected functions
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-114
Process View of Business
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-115
Order fulfillment
Customer request
M a r k e t i n g O p e r a t i o n s F i n a n c e
C E O
Process Flowcharting Creating a visual diagram to describe (represent) a
transformation process
Also called (or similar to):
◦ Process mapping
◦ Flow-process charting
◦ Service blueprinting
◦ Systems flowchart
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-116
Process Flowcharting
Second, find ways to improve current process.
◦ Find repetitive operations
◦ Identify bottlenecks
◦ Describe directions and distances of flows (people, material and information)
◦ Reduce waste
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-117
First, visually describe current process.
Often required for certifications such as ISO9000.
Process Flowcharting
1. Select a transformation process to study.
2. Form a team to develop flowchart & for analysis (to improve
the system).
3. Specify the boundaries of transformation process.
4. Identify and sequence the operational steps.
5. Identify the performance metrics for the steps. - e.g., time to complete each step
6. Draw the flowchart, using consistent symbols.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-118
Common Flowcharting Symbols
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
6-119
Process: operation, activity, or task
Decision: evaluation or “IF-THEN”
Flow: materials, information, customer
Terminator: “START” and “END”
Example: Selecting a Supplier (Figure 6.2)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-120
Service Blueprint
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 121
What is the process for selecting and altering a suit at a retail store?
What activities involved each of the following?
1. Customer 2. Sales associate
3. Tailor
Each needs a “swim lane”
Pressmaster/Shutterstock
Symbols for Flow-Process Chart
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
6-122
Operation: task or work activity
Inspection: checking product quantity or quality
Transportation: movement of material from point to point
Storage: inventory of materials awaiting next operation
Delay: delay in sequence of operations
Example
Picking Operations at Grocery Store
Distribution Center (Figure 6.5)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-123
Questions to Ask in Process-Flow Analysis
Flow: Is it balanced? Where is the bottleneck? Are all steps necessary?
How jumbled is the flow?
Time: How long to produce one unit? Can it be reduced? Is set-up time
excessive? Is waiting time excessive?
Quantity: Theoretical production amount? How easy to change? How
many units actually produced?
Quality: Historical defect rate? Which steps contribute to defects?
Where do errors occur?
Cost: How much to produce one unit? What are cost buckets for one unit?
Can some cost buckets be reduced or eliminated?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-124
Measuring Process Flows
System Capacity = capacity of the most constraining resource
→ The single resource with the least capacity is called the bottleneck
Flow rate = minimum (Supply, Demand, Capacity)
Throughput time = from when processing begins until product or service is completed
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-125
Measuring Process Flows
Little’s Law I = T x R
I = average number of things in the system
T = average throughput time
R = average flow rate into the process
◦ Relates number of items in the system (I) to arrival rate (R) and throughput time (T).
◦ Assumes system is in a ‘steady state.’
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-126
Little’s Law Example ◦ People are in a line to get through security checks at a music festival.
An average of 10 people per minute are processed. People spend 24 minutes in line, on average.
◦ What is the average number of people in line?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-127
◦ I = T x R
◦ I = 24 x 10 → I = 240 people in line, on average
◦ Same problem, but an average of 4 people per minute are processed, and the average number of people in line is 240.
◦ What is the average time spent in line?
◦ T = I / R
◦ T = 240 / 4 → T = 60 minutes in line, on average
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-128
Pizza U.S.A. example (section 6.6)
Activity Minutes Who/What
Take the order 1 Assistant
Make the crust 3 Chef
Prepare and add ingredients
2 Chef
Bake the pizza 24 Oven
Cut pizza and box the order
1 Assistant
Take payment 1 Assistant
Details: Assume all toppings added to every pizza. Two employees working at a time. Oven can bake up to 4 pizzas at a time.
Map the Process
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-129
Take order
Make crust
Prep/add ingredie
nts
Bake pizza
Take payme
nt
Cut/bo x pizza
STAR T
END
1 min. 3 min. 2 min.
24 min.
1 min.1 min.
What is the Throughput Time?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-130
Throughput time = time to complete one product or service
Pizza throughput time? 1 + 3 + 2 + 24 + 1 + 1 =
32 min.
What is Process Capacity?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-131
Assistant: 1+1+1=3 min. per pizza, 20 pizzas per hr.
Chef: 3+2=5 min. per pizza, 12 pizzas per hr.
Oven: 24/4=6 min. per pizza, 10 pizzas per hr.Therefore… process capacity (flow rate) = 10 pizzas/hour
3 resource s
What is the Process Bottleneck?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-132
At an average process time of 6 min. per pizza… the OVEN is the slowest activity….. and that determines process capacity…. and is, therefore, the bottleneck.
The process cannot produce more than the slowest activity. (flow rate = 10 pizzas/hr)
Process Redesign Identify, analyze, improve critical processes. (may cross organizational boundaries)
Extreme cases: Complete process reconfiguration. (eliminating many steps)
Business Process Reengineering (BPR)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-133
Check the text for a successful example from Credit Suisse.
Principles of Process Redesign
• Organize around outcomes, not tasks.
• Have the people who do the work process their own information.
Avoid handoffs, whenever possible.
• Put the decision point where work is performed, and build control into the process.
Make decisions at lowest possible level.
• Eliminate unnecessary steps in the process. Simplify, eliminate non-value-added activities.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-134
Chapter 6 Summary
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 6-135
LO 6.1 Describe process thinking and system boundaries.
LO 6.2 Explain how the process view of business is cross-functional.
LO 6.3 Construct a process flowchart for a given process.
LO 6.4 Analyze a process by asking a wide variety of questions informed by the process flowchart.
LO 6.5 Calculate process-flow capabilities using analytics.
LO 6.6 Explain the principles of process redesign.
Questions for Discussion
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 136
•Based on your work experience, can you define a “system” in which you have worked?
•Draw a simple process map for a breakfast process such as making coffee or toast.
•What sorts of “decisions” are involved in your breakfast process?
•What is the bottleneck in your breakfast process?
•Have a classmate review your breakfast process map and provide suggestions for improvement!
•If you could redesign one of the processes on campus, which would you choose? What are some of your ideas?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 137
Chapter 7:
Lean Thinking and Lean Systems
McGraw-Hill Education
Chapter 7 Learning Objectives
LO 7.1 Describe the origins and evolution of lean thinking.
LO 7.2 Describe the five tenets of lean thinking and the seven forms of waste in a lean system.
LO 7.3 Explain why a stabilized master schedule is required for smooth flow.
LO 7.4 Explain how setup time, lot size, layout, and maintenance are related to lean thinking.
LO 7.5 Differentiate how employees are unique in lean systems.
LO 7.6 Design a Kanban system to achieve customer pull.
LO 7.7 Compare lean suppliers to traditional manufacturing suppliers.
LO 7.8 Explain how to implement a lean system.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-138
Evolution of Lean Toyota Production System (TPS)
◦ Developed in Japan following WWII (due to limited resources)
◦ Also known as Just-in-Time (JIT) manufacturing
◦ Came to U.S. in 1981 at Kawasaki motorcycle plant in Lincoln, Nebraska
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-139
1990s book, “The Machine That Changed the World”
by Womack, Jones & Roos
Popularized a new label:
Lean Production Walter Cicchetti/123RF
Lean Tenets Create product/service value from customer perspective
◦ Reduce waste - muda
Identify, study, improve the value stream ◦ Observe the process - gemba
Ensure simple, smooth, error-free flow ◦ Determine takt time
Produce only what is pulled by customer ◦ Use kanbans
Strive for perfection ◦ Hold kaizen events, 5S, 5 Whys
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-140
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-141
Create Value: Seven Forms of Waste
Overproduction: Producing more than the demand for customers, resulting in unnecessary inventory, handling, paperwork, and warehouse space.
Waiting time: Operators and machines waiting for parts or work to arrive from suppliers or other operations. Customers waiting in line.
Unnecessary transportation: Double or triple movement of materials due to poor layouts, lack of coordination, and poor workplace organization.
Excess processing: Poor design or inadequate maintenance or processes, requiring additional labor or machine time.
Too much inventory: Excess inventory due to large lot sizes, obsolete items, poor forecasts, or improper production planning.
Unnecessary motion: Wasted movements of people or extra walking to get materials.
Defects: Use of material, labor, and capacity for production of defects, sorting out bad parts, or warranty costs with customers.
Value Stream Mapping Value stream is all processing steps to complete product/service
Extension of process flowcharting
Includes value-adding/non-value-adding activities
Requires direct observation of process – gemba
“Is this step or task necessary in creating value for the customer?”
Change and improve process
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-142
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-143
Example: Value Stream Mapping
Ensure Flow: Inventory Hides Problems (Figure 7.2)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-144
Poor quality
Unreliable supplier
Machine breakdownInefficient
layout
Bad design
Lengthy setups
W at
er
Le ve
l
Water level indicates level of inventory in the system
Lower Inventory Level Exposes Problems
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-145
Poor quality
Unreliable supplier
Machine breakdown
Inefficient layout
Bad design
Lengthy setups
W at
er
Le ve
l
Water level indicates level of inventory in the system
Water Flows Smoothly... Once Problems Resolved
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-146
W at
er
Le ve
l
Water level indicates level of inventory in the system
Problems addressed/solved
Customer Pull: Push versus Pull System (Figure 7.3)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 147
Downstream customer signals need for good or service.
Signal is sent upstream that production is needed.
No upstream process is authorized to produce until customer pulls, thus minimizing inventory in the system.
Strive for Perfection: Quality in a Lean System
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-148
Defects are waste.
No inventory to cover up mistakes.
System designed to expose errors; correct them at their source (so not repeated in the future).
Continuous improvement of the process.
Quality is essential input into lean system.
5 Whys Technique
Explores cause-and-effect relationships that underlie problems (root causes)
Enables root causes to be identified/resolved
Example: Truck won’t start. ◦ Why? Battery is dead. ◦ Why? Alternator is not functioning. ◦ Why? Alternator belt is broken. ◦ Why? Truck was not maintained as recommended. ◦ Why? Truck is old; no replacement parts available. ◦ Solution? Find source for parts, or purchase new truck.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-149
5S Technique Organize workspace to improve employee morale, safety, efficiency.
Reduces time looking for “things.”
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-150
Seiri to Sort (keep, toss) Seiton to Straighten or set in order Seiso to Shine, sweep, or clean Seiketsu to Standardize Shitsuke to Sustain (maintain)
Example: 5S Technique
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-151
Storage of chemicals in production area
Before • Quantities greater than needed • Difficult to see what is missing • Hard to find anything
After • Appropriately sized quantities • Quickly see what is missing • Easy to find anything
Source: The Lean & Chemicals Toolkit/U.S. Environmental Protection Agency
Creating Flow
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 152
Stabilize master schedule
Reduce setup times and lot sizes
Change to cellular layout and preventative maintenance
Cross-train and engage workers
Stabilize the Master Schedule
Production horizon set according to demand.
Production schedule repeated each day.
Uniform load: level work load across workers/machines.
Takt time: match supply (production rate) to demand rate .
Produce planned quantity each day, and no more.
These concepts are desirable, but not essential, to a lean system.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-153
Reduce Setup Time and Lot Size Reducing setup time…
◦ increases available capacity ◦ increases flexibility to meet schedule changes ◦ reduces inventory
Setup types ◦ Single (single digit minutes) ◦ One-touch (less then 1 min; 2-step process)
◦ Internal (while machine stopped) ◦ External (while machine operating)
Lot size reduction ◦ Goal: single unit production
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-154
Cellular Layout (Figure 7.4)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-155
• Inventory kept on shop floor close to where it is used.
• Eliminates wasted transportation moving materials.
• Work centers organized into group technology layout - cellular manufacturing.
• U-shape ensures flow without interruption.
Engaging Workers
Multifunction, cross-trained workers ◦ Flexibility to move to busy work centers
New pay system to reflect skills variety
Workers contribute individually and collaboratively ◦ Perform own maintenance and inspection
◦ Teamwork, problem solving
◦ Suggestion systems
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-156
Pull: Kanban System
Signals the need for more parts
Uses simple cards or signals to control production and inventory
Each work center receives production order (signal or card) from succeeding (downstream) work center
Prevents buildup of inventory
Reduces lead time
Same concept applies to receiving deliveries from suppliers (supplier must wait for signal)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-157
Kanban System (Figure 7.5)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-158
Kanban System
Kanban: “marker” (card, sign, empty container)
Visual control system of cards and containers, or other signal.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-159
D = Demand rate (at work center) T = Time for container to complete circuit C = Container size (# units)
Number of containers:
C
DT n
Kanban Containers - Example
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 160
Demand at work center B is 5 parts per minute and a standard container holds 50 parts.
It takes 90 minutes for a container to make a complete circuit through work center A and work center B (and back to A), including all setup, run, move, and wait times.
The number of containers needed:
n = 5(90) / 50 = 9 containers
The maximum inventory in the production system, a useful measure of how lean the system is:
Maximum inventory = nC = DT = (9 × 50) = (5 × 90)
Supplier Relationships
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
Viewed as the ‘external factory’
Co-location, frequent deliveries
Fewer suppliers
No inspection—high quality is assumed (required)
Integrated supplier programs Early supplier selection
Family-of-parts sourcing
Long-term strategic relationship
Reduce paperwork and inspection
7-161
Implementation: Kaizen Event Establish a cross-functional team
Determine what customers value
Construct value stream map Eliminate waste (non-value-adding activities)
Create smooth and error-free flow
Use customer demand to pull work thru process
Implement team ideas
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-162
Chapter 7 Summary
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 7-163
LO 7.1 Describe the origins and evolution of lean thinking.
LO 7.2 Describe the five tenets of lean thinking and the seven forms of waste in a lean system.
LO 7.3 Explain why a stabilized master schedule is required for smooth flow.
LO 7.4 Explain how setup time, lot size, layout, and maintenance are related to lean thinking.
LO 7.5 Differentiate how employees are unique in lean systems.
LO 7.6 Design a Kanban system to achieve customer pull.
LO 7.7 Compare lean suppliers to traditional manufacturing suppliers.
LO 7.8 Explain how to implement a lean system.
Questions for Discussion
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 164
•Why did lean (Toyota Production System) work so well in Japan after World War II?
•Choose one of the Japanese words from the 5 lean tenets and explain it in your own words.
•Which of the 7 forms of waste can you observe at your favorite restaurants?
•What does it mean to say that “inventory hides problems” in a production system?
•Consider what “setup time” looks like in different industries: hospitals, quick oil change shops, restaurants, garment producing factories.
•Make a mental list of how you would “5S” your own refrigerator. Then, share your ideas with classmates and compare how they approached this task.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-165
Chapter 8:
Managing Quality
McGraw-Hill Education
Chapter 8 Learning Objectives
LO 8.1 Explain quality, from a customer perspective.
LO 8.2 Characterize product quality based on four dimensions.
LO 8.3 Distinguish service quality from product quality based on its distinct measurement.
LO 8.4 Apply the quality cycle to a product or service.
LO 8.5 Explain how mistake-proofing and the supply chain are integrated with quality management planning.
LO 8.6 Attribute how cost of quality is related to financial performance.
LO 8.7 Recall the two key quality pioneers and their main ideas.
LO 8.8 Compare and contrast ISO 9000 standards and the Baldrige Award criteria.
LO 8.9 Articulate some key barriers to successful quality improvement efforts. COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS
RESERVED. 8-166
What is Quality Management?
Quality is one of the four key objectives of operations: ◦ cost, quality, delivery, flexibility
Historical development of quality concepts ◦ Inspection (early 1900s)
◦ Statistics quality control (Shewhart - 1940s)
◦ Quality management (1960s)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-167
Quality is now viewed
as the responsibility of all functions
in the organization.
Comair Flight 5191, Lexington, KY
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-168
“The Comair Flight 5191 crew began the day by powering up the wrong plane. They took off down the wrong runway. The air traffic controller, working alone in violation of FAA policy, had turned his back to do other duties. Investigators are uncovering a series of mistakes before the plane crashed, killing 49 people.”
Source: www.cnn.com, 2006
Quality involves the entire organization and the supply chain.
Definition of Quality
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-169
Meaning: Only the customer can determine quality.
Meaning: The product or service is fit for customer use.
Meeting, or exceeding, customer requirements now and in the future.
Dimensions of Product Quality
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-170
QUALITY
Quality of Design
Determined before the product is produced
Responsibility of cross-functional product design team
Translates customer “wishes” into specifications
Depends on market research, design concept, product specifications
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-171
Quality of Conformance
Producing a product (or service) that meets specifications
Even ‘cheap’ products can have high conformance quality
- May not be durable, but conformance quality is achieved if product matches the design.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-172
The “Abilities”
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-173 8-173
• Availability • Continuity of usefulness to customers (operational)
• Reliability • Useful product/service time until failure • Mean time before failure (MTBF)
• Maintainability • Restoration of product/service after failure • Mean time to repair (MTTR)
Uptime Availability
Uptime Downtime
MTBF Availability
MTBF MTTR
Availability Example
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-174 8-174
• A piece of medical testing equipment is typically used for 3 hours and then requires 1 hour of maintenance. → Calculate the machine’s availability.
• MTBF = 3 hours • MTTR = 1 hour • Availability = 3 / (3 + 1) = .75 • The machine’s average availability is 75%.
Uptime Availability
Uptime Downtime
MTBF Availability
MTBF MTTR
Field Service
Warranty and repair/replacement of the product after it has been sold
Also called customer service, sales service, or just “service”
Dimensions ◦ Promptness
◦ Competence
◦ Integrity
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-175
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-176
Different Types of Quality (Figure 8.1)
Quality of market research
Quality of concept
Quality of specification
Technology
Employees
Management
Reliability
Maintainability
Logistical support
Promptness
Competence
Integrity
Quality of design
Quality of conformance
Availability
Field service
Customer satisfaction
Fitness for use
Service Quality
• Includes explicit and implicit service characteristics
• Measures are perceptual/subjective
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-177
SERVQUAL is most popular measure • Tangibles → appearance • Dependability → promised service • Responsiveness → prompt, helpful • Assurance → knowledge, courtesy • Empathy → caring, individualized
The Quality Cycle (Figure 8.2)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-178
MARKETING Interprets customer needs Works with customer to design product
Interpretation of needs
CUSTOMER Quality needs
Needs
OPERATIONS Produces the product or services
QUALITY CONTROL Plans and monitors quality
Product
ENGINEERING Defines design concept Prepares specifications Defines quality characteristics
Specifications
Cross- functional
team
Quality Cycle in Mass Transit System (Figure 8.3)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-179
County planning Regional planning State transportation agency
Planner Scheduler
Routes Schedules Budgets
Method Facilities Equipment
Evaluation Inspection Audits Surveys Hearings
Public
Operations office
Riders’ needs
Quality Improvement Cycle
Define quality attributes on the basis of customer needs.
Decide how to measure each attribute.
Set quality standards.
Establish appropriate tests for each standard.
Find and correct causes of poor quality.
Continue to make improvements.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-180
Poka-Yoke (poh-kah yoh-kay)
Developed at Toyota, means ‘mistake proofing’
Design the product or process so that mistakes cannot occur or are immediately detectable
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-181
Examples - In manufacturing, 2 parts are notched to
only fit together one way
- For consumers, snow blower requires that two hand levers be held during operation (so no hands can be in the dangerous moving parts!)
Suppliers Role in Quality
Involve in product design ◦ Prevent design defects; help select materials
Supplier certification ◦ Planning and control system for quality
Manage rolled yield (cumulative defect rate) ◦ 10 parts (1% defects in each)
◦ Rolled yield = (.99)10 = .90
◦ 90% quality yield for final product
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-182
Boeing supplier rating system: Red (Unsatisfactory) Yellow (Improvement needed) Bronze (Satisfactory) Silver (Very Good) Gold (Exceptional)
Cost of Quality
◦ Prevention ◦ Training, data management, planning
◦ Appraisal ◦ Incoming materials inspection, final inspection
◦ Internal failure ◦ Scrap, rework, downtime
◦ External failure ◦ Warranty, returns, complaints
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-183
Control costs
Failure costs
Cost of Quality Trade-offs (Figure 8.5)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-184
100% defective
100% good
Cost/unit
Prevention & appraisal
costs
Internal & external
failure costs
Quality Pioneer: W. Edwards Deming
14 Management Principles
Do not sacrifice quality for short-term profit
Emphasis on continuous improvement
PDCA Wheel ◦ Plan, Do, Check, Act
http://www.deming.org/
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-185
Quality Pioneer: Joseph Juran
Quality “Trilogy”—planning, control and improvement
Solve “the vital few” quality problems
Stressed quality control methods
“Quality Handbook”
http://www.juran.com
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-186
Juran lived to age 104, shown here with author Roger Schroeder
©Roger Schroeder
ISO 9000 Standards
Guidelines for designing, manufacturing, selling, and servicing products.
Selecting ISO 9000 certified suppliers provides some assurance that they follow accepted quality practices.
Many manufacturers require supplier certification, particularly in Europe.
www.iso.org
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-187
ISO 14000 Standards Standards covering environmental management systems,
environmental auditing, evaluation of environmental performance, environmental labeling, and life-cycle assessment.
Helps organizations improve their environmental performance through documentation control, operational control, control of records, training, statistical techniques, and corrective and preventive actions.
ISO 26000 – social responsibility
ISO 31000 – risk management
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-188
Baldrige Award Highest U.S. quality award.
Promotes quality management practices and improved quality results by U.S. industry.
Award criteria are the standard for “best quality practices” in U.S.
Many state and other country awards modeled on award criteria.
www.baldrige.gov
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-189
Source: United States Department of Commerce
Baldrige Criteria Categories
1. Leadership
2. Strategy
3. Customers
4. Measurement, Analysis, and Knowledge Management
5. Workforce
6. Operations
7. Results
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-190
Why Some Quality Improvement Efforts Fail
Lack of middle and top management leadership attention
Lack of funds for training and time for improvement activities
“Blame the employee” rather than the system
Belief in “trade-offs” (quality vs. cost)
Management interference with teamwork
Supplier quality problems
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-191
Chapter 8 Summary
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
8-192
LO 8.1 Explain quality, from a customer perspective.
LO 8.2 Characterize product quality based on four dimensions.
LO 8.3 Distinguish service quality from product quality based on its distinct measurement.
LO 8.4 Apply the quality cycle to a product or service.
LO 8.5 Explain how mistake-proofing and the supply chain are integrated with quality management planning.
LO 8.6 Attribute how cost of quality is related to financial performance.
LO 8.7 Recall the two key quality pioneers and their main ideas.
LO 8.8 Compare and contrast ISO 9000 standards and the Baldrige Award criteria.
LO 8.9 Articulate some key barriers to successful quality improvement efforts.
Questions for Discussion
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
193
•Look at a product you are carrying with you today. What design characteristics contribute to its overall quality?
•Why does the customer need to define quality for a product or service?
•Consider your favorite restaurant or coffee shop. What “tangible” observations contribute to your assessment of quality?
•Availability of a system is never 100%! What do you think the availability of wifi on your campus is? Availability of your phone service?
•Can you think of examples of poka yokes? Have you designed some of your own?
•Why don’t companies spend more on prevention of quality problems?
•Look up some Baldrige Award winning organizations. Are you a customer of some of these?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-1
Chapter 9:
Quality Control and Improvement
McGraw-Hill Education
Chapter 9 Learning Objectives
LO 9.1 Describe the steps in designing a quality control system.
LO 9.2 Design a process control system using control charts.
LO 9.3 Define and calculate process capability.
LO 9.4 Apply continuous improvement concepts using the seven quality tools.
LO 9.5 Explain Six Sigma and the DMAIC process.
LO 9.6 Differentiate lean and Six Sigma.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-2
Design of Quality Control Systems
Break down production process into sub- processes and identify internal customers.
Identify critical control points where inspection or measurement should take place.
Use operator inspection when possible, placing responsibility for quality on workers.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-3
Design of Quality Control Systems
Identify critical points for inspection and testing • Incoming materials and services • During processes • Finished product or service
Decide on the type of measurement • Variables: continuous scale • Attributes: discrete count, or good/bad
Decide on amount of inspection to use
Decide who should do inspection
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-4
Types of Measurement
Variables measurement Product/service characteristic that can be measured on a continuous scale:
Length, size, weight, height, time, velocity, temperature
Examples: dimensions of parts, viscosity of liquids, weight of packaged food, time to load webpage, temperature of coffee when served
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-5
Attributes measurement Product/service characteristic evaluated with a discrete choice:
Good/bad, pass/fail, count of defects
Examples: laptop is defective if it fails any functional tests, bank check is/is not deposited in correct account, inspection of fabric reveals the number of defects per 100 yards
Process Quality Control
Principles of Process Control: ◦ Every process has random variation.
◦ Production processes are not usually in a state of control.
“State of Statistical Control” - What does it mean? ◦ Unnecessary variation has been eliminated.
◦ Remaining variation is due to random causes.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-6
Process Quality Control
Assignable (special) cause variation ◦ Can be identified and corrected.
◦ Could be due to machine, worker, materials, etc.
Common (random) cause variation ◦ Reasonable, acceptable variation.
◦ Within 3 standard deviations ( 3) of mean.
◦ Cannot be changed unless process is redesigned.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-7
Quality Control Chart
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 9-8
x
y
Time →
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-9
Normal Distribution on Control Chart
UCL
Mean
LCL
Samples:
Assignable causes likely
1 2 3
Attribute Control (3)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-10
Calculate center line = mean proportion defective across many samples
Calculate upper and lower control limits
9-10
p-chart
(1 ) 3
p p p
n
Variables Control (3)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-11
Calculate center line = mean of sample means
Calculate upper and lower control limits
Calculate center line = mean of sample ranges
Calculate upper and lower control limits
9-11
x-chart
R-chart
RDLCL 3
RDUCL 4
RAx 2
Quality Control Chart Example (Figure 9.2)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12
Using Quality Control Charts
If an observation (data point) is outside 3 and/or a pattern is detected, the process is NOT in control.
Very likely something is wrong.
An assignable cause of variation may exist.
This is a signal to take action to eliminate the assignable cause: ◦ Find it, understand its cause, fix it so it does not occur again!
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-13
Using Quality Control Charts
How large should sample be? ◦ Large enough to detect defects
◦ Variables can use smaller sample sizes
How frequently to sample? ◦ Depends on cost, production rate
Process control vs. Process capability ◦ Is the process capable of producing to specification?
◦ Are the specifications appropriate?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-14
Process Capability Index (Figure 9.3)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-15
F re
qu en
cy
Process measure
Process measure
Computation of Cpk (Figure 9.4)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-16
F re
qu en
cy
Process measure Process measure
Continuous Improvement
When process is not meeting customer specifications.
Work on processes with strategic importance and low process capability first!
Use the seven tools of quality control.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-17
Seven Tools of Quality Control
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-18
Seven Tools of Quality Control
A battery manufacturer in NW Ohio, using only the seven tools of quality, decreased defectives from 7.2 per 100 to 2.6 per 100 in just 6 weeks!
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-19
Pareto Analysis (Table 9.4)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-20
Note: 40% (2) of the sources cause 78.6% of the defects.
Pareto Diagram (Figure 9.6)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-21
Cause-and-Effect (fishbone, Ishikawa) Diagram (Figure 9.7)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-22
L o o s e c o n n e c t i o n s
W o r k e r s
M a t e r i a l c o n n e c t o r s
I n s p e c t i o n T o o l s
C o n t e n t N u t s
K n o w l e d g e F a t i g u e
T r a i n i n g
H o s e
S i z e
S u r f a c e d e f e c t
S i z eS m a l l
L a r g e
J u d g m e n t
M e a s u r e m e n t M e a s u r i n g
t o o l s E r r o r s
I n s p e c t o r
E x p e r i e n c e
T r a i n i n g
W e a r
A d j u s t m e n t
T o r q u e
A i r p r e s s u r e
Six Sigma Quality
Philosophy of 3.4 defects per million.
Uses project/team approach.
Strategic process is selected for improvement.
Cross-functional team is formed.
‘Black belt’ leader is chosen.
Team uses DMAIC method (and quality tools) to find root causes and improve processes.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-23
Six Sigma Process
Process Improvement steps (DMAIC):
1. Define - select process
2. Measure - measure relevant variables
3. Analyze - determine root causes and alternatives
4. Improve - change process
5. Control - ensure improvements not lost over time
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-24
Lean and Six Sigma Complementary approaches to improvement
◦ Lean seeks to eliminate waste (non-value-added) ◦ Six Sigma seeks to eliminate defects
◦ Lean uses part-time leaders and all employees ◦ Six Sigma uses full-time leaders and selected employees
◦ Lean requires limited training ◦ Six Sigma requires extensive training and experts
◦ Lean focuses on simpler projects ◦ Six Sigma takes on complex projects
◦ Lean projects may last a week or less ◦ Six Sigma projects may last for months
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-25
Chapter 9 Summary
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
9-26
LO 9.1 Describe the steps in designing a quality control system.
LO 9.2 Design a process control system using control charts.
LO 9.3 Define and calculate process capability.
LO 9.4 Apply continuous improvement concepts using the seven quality tools.
LO 9.5 Explain Six Sigma and the DMAIC process.
LO 9.6 Differentiate lean and Six Sigma.
Questions for Discussion
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
27
•In your own words, what is quality control?
•Why is quality control needed in manufacturing? In services?
•How do you decide which type of control chart may be useful for a particularly situation?
•Look at the seven quality tools. Brainstorm various situations in which each of the tools could be useful.
•Why is Six Sigma called “Six Sigma”?
•How are lean and Six Sigma the same, and how are they different?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
10-28
Chapter 10:
Forecasting
McGraw-Hill Education
Chapter 10 Learning Objectives
LO 10.1 Describe why forecasting is important.
LO 10.2 Describe the four common methods of qualitative forecasting.
LO 10.3 Use forecast analytics to calculate a moving average and exponential smoothed average.
LO 10.4 Evaluate forecast accuracy using a variety of methods.
LO 10.5 Carry out forecast analytics for a causal model.
LO 10.6 Evaluate factors that impact forecasting method selection.
LO 10.7 Describe how big data analytics are used to forecast.
LO 10.8 Explain the benefits and costs of CPFR.
LO 10.9 Solve advanced forecasting problems (chapter supplement).
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-29
Forecasting for Decision Making
Forecasting demand for operations output ◦ Forecasting: what we think demand will be
◦ Planning: what we think demand should be
◦ Demand: may differ from sales
Forecasts are used in all functional areas: ◦ marketing, finance, human resources, etc.
Forecasts are necessary for operations decision areas: ◦ process design, capacity planning, inventory management, scheduling
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-30
Use of Forecasting: Marketing, Finance/Accounting, & HR
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-31
Use of Forecasting: Operations Decisions
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-32
Qualitative Forecasting Methods
Major methods: ◦ Delphi technique
◦ Market surveys
◦ Life-cycles analogy
◦ Informed judgment
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-33
Based on managerial judgment when there is a lack of data available.
Time-Series Analytics
Demand can be decomposed into:
◦ Level - average
◦ Trend - general direction (increasing/decreasing)
◦ Seasonality - short term recurring cycles
◦ Cycle - long term business cycle
◦ Error - random or irregular component
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-34
Time-Series Analytics
Components of demand data: ◦ Level
◦ Trend
◦ Seasonality
◦ Cycle
◦ Error
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-35
Snow boarding is an industry that exhibits several demand patterns. It is primarily a seasonal industry, and over many years the industry has experienced a growth trend. Random factors like snowfall cause abrupt variations in demand.
Adie Bush/Getty Images
Analytics: Moving Average
Assumes no trend, seasonality, or cycle
Simple moving average:
Weighted moving average:
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-36
N
DDD A Nttt
t 11 ......
tt AF 1
11211 ...... NtNtttt DWDWDWAF
Moving Average - Example
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-37
Period Actual Demand Forecast
1 10
2 18
3 29
4 - 19
Compute three period moving average for Period 4 (number of periods is forecaster’s decision)
F4 = A3 = (29 + 18 + 10) / 3 = 19
F5 = (actual demand for period 4 + 29 + 18) / 3
Time-Series Data (Figure 10.2)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-38
Note: The forecast is smoother as the number of periods in the moving average increases.
Analytics: Exponential Smoothing
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-39
The new average is computed from the old average:
The value of the smoothing constant () is a choice. It determines the extent to which the new forecast weights recent demand (smooths random variation).
Αlpha (α) ranges between 0 and 1, and is usually 0.1 - 0.2.
11 ttt ADA
Simple Exponential Smoothing
Forecast:
F = forecast of demand
D = actual demand
t = time period
Assumes no trend, seasonality, or cycle
Note: we are adjusting Ft to get Ft+1
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-40
tttt FDFF 1
Exponential Smoothing - Example
Sept. forecast was 15, but Sept. actual sales were 13.
Use alpha (α) of 0.2.
What is the October forecast?
October forecast = Sept. forecast + α(Sept. actual – Sept. forecast)
= 15 + 0.2(13 - 15)
= 15 - 0.4 = 14.6
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-41
Time-Series Data (Figure 10.3)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-42
Note: The forecast is smoother as the value of alpha (α) is reduced.
Forecast Accuracy
Firms should estimate forecast accuracy:
To monitor erratic demand observations or “outliers”
To determine when the forecasting method is no longer tracking actual demand
To determine the parameter values that provide the forecast with the least error
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-43
Forecast Accuracy Measures
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-44
Cumulative sum of forecast errors
Mean square error
Mean absolute deviation
Mean absolute percentage errors
Tracking signal
Advanced Time-Series Forecasting
Adaptive exponential smoothing ◦ Smoothing coefficient () is varied
Mathematical models ◦ Linear or nonlinear
Box-Jenkins method ◦ Requires about 60 periods of past data
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-45
Causal Forecasting Analytics
Examples: ◦ Use population and location
characteristics to forecast restaurant sales.
◦ Use supply chain data on inventory levels to forecast sales of new generation products such as cell phones.
◦ Use day of week and attendance of entertainment event at same venue to forecast expected guests at casino.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-46
Cause-and-effect model, using a data set of other variables to predict demand (forecast).
Steve Allen/Brand X Pictures/Jupiterimages
Causal Forecasting Model
The general regression model:
Other forms of causal model: ◦ Econometric
◦ Input-output
◦ Simulation models
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-47
Causal Model - Example
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-48
Yt = a + b(It)
F7 = 38.23 + 2.397(37.6) = 128.34 = forecast for Period 7
Dt = actual sales in year t
Ft = forecasted sales
It = median family income (000’s)
Selecting a Forecasting Method
Use or decision characteristics ◦ Scheduling decision? Facility expansion? ◦ Short range? Long range?
Data availability ◦ Quantity and quality
Data pattern ◦ Level? Unstable?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-49
Big Data Analytics
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
50
Resources needed:
Data • Either firm’s own or
acquire from elsewhere
• Quantitative (e.g. past demand) or qualitative (e.g. call center recordings)
Expertise • Data scientists • Statisticians • Analysists • Technical skills
needed but also understanding of industry and key challenges
Tools • Hardware • Software • Data storage • Tools for analysis
Big Data Analytics
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
51
Walmart collects data on more than one million customer transactions every hour.
Collaborative Planning, Forecasting, and Replenishment (CPFR)
Aim is to achieve more accurate forecasts
Share information across supply chain with customers and suppliers
Compare forecasts If discrepancy observed, look for reason
Reach a consensus forecast
Works best in B2B with few customers (e.g., a manufacturer supplying a small number of large retailers)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-52
Chapter 10 Summary
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 10-53
LO 10.1 Describe why forecasting is important.
LO 10.2 Describe the four common methods of qualitative forecasting.
LO 10.3 Use forecast analytics to calculate a moving average and exponential smoothed average.
LO 10.4 Evaluate forecast accuracy using a variety of methods.
LO 10.5 Carry out forecast analytics for a causal model.
LO 10.6 Evaluate factors that impact forecasting method selection.
LO 10.7 Describe how big data analytics are used to forecast.
LO 10.8 Explain the benefits and costs of CPFR.
LO 10.9 Solve advanced forecasting problems (chapter supplement).
Questions for Discussion
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
54
•Think of examples of products and services for which demand may be fairly easy to forecast, and that may be quite difficult to forecast.
•Why are all firm functional areas – finance, accounting, HR, marketing, IT – involved in forecasting?
•How do qualitative forecasting methods translate “information” into quantities?
•When should a firm use a weighted moving average forecast, rather than the simple moving average?
•What opportunities do big data and analytics create for firms?
•Define “analysis paralysis” for forecasting. How does this happen? What can management do about it?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-55
Chapter 11:
Capacity Planning
McGraw-Hill Education
Chapter 11 Learning Objectives
LO 11.1 Define capacity and utilization.
LO 11.2 Illustrate with an example a facilities strategy that considers: amount, size, timing, location and type.
LO 11.3 Explain how S&OP is done.
LO 11.4 Identify the demand and supply options that are available for S&OP.
LO 11.5 Contrast and compare the chase and level strategies.
LO 11.6 Define the various costs associated with aggregate planning.
LO 11.7 Create an alternative strategy for the Hefty Beer Company example.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-56
Hierarchy of Capacity Decisions
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-57
Facilities decisions
Aggregate planning
Scheduling
0 6 12 18 24 Months
Planning Horizon
Scheduling
Facilities decisions
Aggregate planning
Definition of Capacity
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-58
Theoretical capacity • Labor availability and overtime
• Physical assets, delayed maintenance, etc.
• Can be used for short-term demand spikes
Effective capacity • Used for planning
• Subtracts maintenance downtime, shift breaks,
absenteeism, etc.
Maximum output that can be produced over a given period of time.
sattapapan tratong/123RF
Capacity Utilization
Actual output
Capacity
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-59
x 100%Utilization =
→ Utilization is seldom 100%. → Estimates capacity usage and ‘busyness.’
A production facility that builds 1000 cars during the time it can actually produce 1200 cars has utilization = 1000/1200 = 83%
A doctor who is busy working for 6 hours during an 8 hour shift has utilization = 6/8 = 75%
Facilities Decisions
• How much capacity is needed?
• How large should each facility be?
• When is the capacity needed?
• Where should the facilities be located?
• What type of facilities/capacity are needed?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-60
Facilities Strategy
How much? Amount of capacity ◦ Size of capacity cushion
How large? Size of facilities ◦ Economies/diseconomies of scale
When? Timing of facility decisions ◦ Preemptive, wait-and-see
Where? Location of facilities ◦ Variety of factors to consider
What type? Types of facilities ◦ Product-focused, market-focused, process-focused, general-purpose
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-61
Factors Affecting Facilities Strategy
Predicted demand
Cost of facilities
Likely behavior of competitors
Business strategy
Global considerations
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-62
How Much? Strategies for Capacity Cushion
Capacity cushion = 100% – utilization
Three strategies:
◦ Large cushion
◦ e.g., make-to-order
◦ Moderate cushion
◦ cost of running out balanced with cost of excess capacity
◦ Small cushion
◦ e.g., make-to-stock
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-63
How Large? Selecting Facility Size
Economies of scale ◦ Production costs are not linear
◦ Overhead costs spread over more units
Diseconomies of scale ◦ Increased transportation costs
◦ Cost of more bureaucracy
◦ Increased organizational complexity
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-64
When? Timing of Facility Additions
Preemptive Strategy ◦ Build capacity ahead of need
◦ Positive capacity cushion
Wait-and-see Strategy ◦ Small or negative capacity cushion
◦ Lower-risk strategy
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-65
Where? Facility Location
Quantitative Factors ◦ ROI, NPV
◦ Transportation, Taxes
◦ Lead times
Qualitative Factors ◦ Language, norms
◦ Worker and customer attitudes
◦ Proximity to customers, suppliers, competitors
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-66
This Bacardi Rum factory supplies the entire North American market from a single distillery in Puerto Rico.
Irina Moskalev/123RF
What Type? Types of Facilities
Product-focused (55%) ◦ One family of products/services (e.g., laptops, credit card processing)
Market-focused (30%) ◦ Located near sales (e.g., electricity, bakeries)
Process-focused (10%) ◦ Few technologies (e.g., computer chips, MRI center)
General purpose (5%) ◦ Several products/services (e.g., furniture, banking)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-67
Sales & Operations Planning (S&OP)
Matching supply & demand over a medium time range.
Time horizon of about 12 months.
Aggregated demand for one or few categories of product. Demand may fluctuate or be uncertain.
Possible to change both supply and demand.
Variety of management objectives.
Facilities are fixed (cannot be expanded or reduced) during this planning timeframe.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-68
Cross-Functional Nature of S&OP
Budgeting: closely tied to aggregate plan
HR: workforce availability
Operations: capacity/inventory planning
Accounting: cost analysis
Finance: capital investments
Marketing: sales plan
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-69
See Operations Leader box (in text) for how Hostess uses S&OP.
bhofack2/Getty Images
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
70
Cross-Functional Nature of S&OP (Figure 11.3)
Demand Management
Pricing
Advertising and promotion
Backlogs or reservations (shift demand)
Development of complementary offerings
◦ Seasonal products/service spread demand
◦ Lawn mower, snowblower
◦ Ski resort, mountain biking
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-71
Influence demand through:
Supply Management
Hiring and layoff of employees
Using overtime and undertime
Using part-time or temporary labor
Carrying inventory
Outsourcing/subcontracting
Cooperative arrangements
◦ Share capacity during demand peaks, e.g., airlines, hotels, utilities
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-72
Influence (control) supply through:
Aggregate Planning Strategies
Level Strategy ◦ Constant workforce size
◦ Inventory as buffer
Chase Strategy ◦ Vary workforce size
◦ Produce to meet demand
◦ Typical for services
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-73
Travelers (insurance) uses a level strategy but meets peak demand during disasters (see Operations Leader box in text).
FotoKina/Shutterstock
Aggregate Planning Costs Hiring and firing costs (Chase Strategy)
Overtime and undertime costs (Chase)
Subcontracting costs (Chase)
Part-time labor costs (Chase)
Inventory-carrying costs (Level Strategy)
Cost of stockout or back order (Level)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-74
$
$
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
75
Aggregate Planning Costs: Level Workforce
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Total
Resources
Regular workers 45 45 45 45 45 45 45 45 45 45 45 45
Overtime (%) 0 0 0 0 0 0 0 0 0 0 0 0
Units Produced 450 450 450 450 450 450 450 450 450 450 450 450 5400
Sales Forecast 300 300 350 400 450 500 650 600 475 475 450 450 5400
Inventory (end of month) 200 350 450 500 500 450 250 100 75 50 50 50
Costs
Regular time $180 180 180 180 180 180 180 180 180 180 180 180 $2,160
Overtime 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Hire/Layoff 25 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 25
Inventory carrying 24 42 54 60 60 54 30 12 9 6 6 6 363
Total Cost $229 222 234 240 240 234 210 192 189 186 186 186 $2,548
Aggregate Planning - Level Strategy
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
76
Aggregate Planning - Chase StrategyAggregate Planning Costs
Chase Demand Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Total
Resources
Regular wrkers 30 30 35 40 45 50 65 60 48 47 45 45
Overtime (%) 0 0 0 0 0 0 0 0 0 0 0 0
Units produced 300 300 350 400 450 500 650 600 480 470 450 450 5400
Sales Forecast 300 300 350 400 450 500 650 600 475 475 450 450 5400
Inventory (end of month) 50 50 50 50 50 50 50 50 55 50 50 50
Costs
Regular time $120 120 140 160 180 200 260 240 192 188 180 180 $2,160
Overtime 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Hire/Layoff 40.0 0.0 25.0 25.0 25.0 25.0 75.0 20.0 48.0 4.0 8.0 0.0 295
Inventory carrying 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.6 6.0 6.0 6.0 72.60
Total Cost $166 126 171 191 211 231 341 266 246 198 194 186 $2,527.60
Chapter 11 Summary
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
11-77
LO 11.1 Define capacity and utilization.
LO 11.2 Illustrate with an example a facilities strategy that considers: amount, size, timing, location and type.
LO 11.3 Explain how S&OP is done.
LO 11.4 Identify the demand and supply options that are available for S&OP.
LO 11.5 Contrast and compare the chase and level strategies.
LO 11.6 Define the various costs associated with aggregate planning.
LO 11.7 Create an alternative strategy for the Hefty Beer Company example.
Questions for Discussion
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
78
•Think of examples of how capacity might be measured in a variety of industries.
•Consider how the hierarchy of capacity decisions may be made at your current school. What is likely included in long, medium, and short term decisions?
•Describe instances when you saw a very high utilization rate and a very low utilization rate. What is driving these?
•How is S&OP related to each business function?
•How would demand and supply management concepts be applied in service industries such as a dental clinic, movie theater, accounting firm?
•Read the Operations Leader box on Travelers (insurance). How do they use a level strategy when they face peak demand during a disaster?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-79
Chapter 12:
Scheduling Operations
McGraw-Hill Education
Chapter 12 Learning Objectives
LO 12.1 Describe the concept of batch scheduling.
LO 12.2 Construct a Gantt chart.
LO 12.3 Create work schedules using forward and backward scheduling.
LO 12.4 Explain the implications of the theory of constraints for scheduling.
LO 12.5 Compare various dispatching rules.
LO 12.6 Describe the important factors to consider when designing a scheduling system.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-80
Scheduling Operations
Most detailed and most constrained decisions in capacity planning hierarchy
Results in a time-phased plan (by hour, week)
Allocation of resources (workers, machines) to tasks
Trade-offs (conflicting objectives) ◦ High efficiency
◦ Low inventories
◦ Good customer service
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-81
Batch Scheduling
Network of queues, as job moves from work station to work station job = manufacturing parts, customer, paperwork
work station = machine, room, facility, worker
Customers or jobs spend most of their time at work stations waiting to be processed
Typical for actual work to be 5-20% of total throughput time
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-82
Batch Scheduling
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-83
WS 1 WS 2wait move
queue
move
move waitqueue
move
move move
WS = work station “move” = movement of work: parts, customers, paperwork, etc.
move queue process wait move…
Challenges of Batch/Job Shop Scheduling
Variety of jobs processed
Different routing and processing requirements of each job
Number of different job orders in the facility at any one time
Competition for common (constrained) resources
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-84
Gantt Charting Scheduling multiple jobs thru a set of work centers, minimizing completion time
Machine performance measures: ◦ Makespan = total time to complete a set of jobs
◦ Machine utilization = percent of makespan time machine (or person) is used.
Used to monitor progress of jobs
Optimal schedule can be computationally intensive for multiple jobs/multiple machines
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-85
Job Data for Scheduling - Example
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-86
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-87
Scheduling Example
Process A Process C Job 1 A
C
B
Process B
In what sequence should the jobs be done?
Job 4Job 2Job 5
Job 3
Gantt Chart for Example
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-88
Shop Performance Measures
•Machine Efficiency: Makespan or machine utilization
•Customer: Delivery times of the jobs (minimizing job waiting time is complementary measure)
Change the job sequence from 1, 4, 5, 2, 3 to improve efficiency and/or delivery times to the customer.
Machine(s) could be added to improve both efficiency and delivery times.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-89
Conclusions about Batch Scheduling
Performance is highly sequence dependent.
Waiting time depends upon job interference in the schedule and available capacity.
Finding optimal schedules is challenging, but good heuristics are available.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-90
Finite Capacity Scheduling Scheduling jobs onto work stations, but not
exceeding the capacity of any given resource.
Used to identify bottlenecks.
Forward scheduling ◦ To determine completion date for all orders.
Backward scheduling ◦ Work backward from due date to determine start dates for orders.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-91
Theory of Constraints (TOC) Proposed by Goldratt in book, The Goal (1983).
Goal is to make money from operations.
Production does not have value until it is sold!
Key elements:
Throughput = sales minus cost of raw materials
Inventory = raw materials value
Operating expenses = cost of labor and overhead
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-92
Theory of Constraints (TOC) Constraint is anything slowing down production … a bottleneck.
◦ Machine or workstation
◦ Market
◦ Procurement system
The bottleneck determines the capacity of the system.
Implication: Operations manager should focus on bottleneck to increase capacity and throughput (and make more money).
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-93
Theory of Constraints (TOC)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
94
Principles observed in organizations:
∙ Companies, departments, and teams have unbalanced capacities. Annual budgets attempt to provide resources to balance capacities, but rarely succeed.
∙ There is always a constraint in the system somewhere in the plant, human resources, purchasing, or sales that prevents the company from making more money.
∙ One hour of capacity lost at the constraint (bottleneck) is an hour lost to the whole organization and can never be recovered.
∙ An hour gained at a nonconstraint does not add to the output or profit of the organization.
∙ Constraints must be managed differently than nonconstraints.
Theory of Constraints (TOC)
In summary, there are four steps to eliminate constraints:
1. Identify the system constraint that prevents the company from making more money.
2. Decide how to reduce the system’s constraint, so it is no longer a constraint.
3. Subordinate everything else (other tasks, work centers, sales, purchasing or other departments) to reducing the constraint.
4. Once the constraint is eliminated, find the next constraint and start over.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-95
Priority Dispatching Rules Which job should be processed next?
◦ Rule for selecting the next job from the queue
Common in services: ◦ First come, first served ◦ Priority rule (first-class customers first) ◦ Preemptive rule (most severe patient treated next)
Common in manufacturing: ◦ Critical ratio = remaining time until due date
remaining processing time ◦ Shortest processing time (quickest job)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-96
Planning and Control Systems
What delivery date should be promised?
Where is the bottleneck?
When should each activity or task be started?
How is on-time job completion ensured?
Sometimes referred to as: ◦ Advanced Planning & Scheduling (APS)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-97
Chapter 12 Summary
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
12-98
LO 12.1 Describe the concept of batch scheduling.
LO 12.2 Construct a Gantt chart.
LO 12.3 Create work schedules using forward and backward scheduling.
LO 12.4 Explain the implications of the theory of constraints for scheduling.
LO 12.5 Compare various dispatching rules.
LO 12.6 Describe the important factors to consider when designing a scheduling system.
Questions for Discussion
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
99
•Read the Operations Leader box on setting the schedule for a soccer team. What other constraints, beyond those listed, do you think may be important for scheduling a soccer team?
•Make a Gantt Chart for the assignments, projects, and exams that you need to complete in this course.
•Challenge! Make a Gantt Chart for your personal workload in all of your current courses.
•Describe the Theory of Constraints in your own words.
•Consider why bottlenecks are such a problem in both manufacturing and service operations. What happens at the bottleneck?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-100
Chapter 13:
Project Planning and Scheduling
McGraw-Hill Education
Chapter 13 Learning Objectives
LO 13.1 Explain the nature of tradeoffs among the three objectives of project management.
LO 13.2 Describe the four activities included in project management.
LO 13.3 Distinguish the advantages and disadvantages of a network over a Gantt chart for project scheduling.
LO 13.4 Calculate the ES, EF, LS, LF for an example network.
LO 13.5 Explain the significance of the critical path and slack.
LO 13.6 Calculate the cost of crashing a network by one or two days.
LO 13.7 Contrast and compare the use of constant-time and CPM networks.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-101
What is a Project? “A temporary endeavor undertaken to create a unique product/service/result.” - Project Mgmt Institute (PMI)
Unique item or event; often a single unit.
Begins and ends; not ongoing activity.
Work often done on-site.
Resources (materials, labor) are brought to the project.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-102
Examples of Projects •Building construction
•New product introduction
•Research & Development
•Computer system design
•Installation of equipment
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-103
•Start-up or shutdown of a plant
•Manufacture of aircraft, ships, and large machines
•Auditing accounts
•Planning a military invasion
NASA mission
Fund-raising campaign
Movie making
Teaching a course
Designing an advertising campaign
Planning for a large fund-raising gala is managed as a project.
HIZIR KAYA/123RF
Objectives and Tradeoffs
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-104
Meet performance
outcomes
Stay on schedule
Stay on budget
Project Management Activities & Decisions
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-105
Planning
Scheduling
Closing
C ontrol
Planning Activities & Decisions
Identify the project customer
Establish the end product/service
Set project objectives
Estimate total resources and time required
Decide on the form of project organization
Make key personnel appointments
Define major tasks required
Establish a budget
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-106
Scheduling Activities & Decisions
Develop a detailed work-breakdown structure
Estimated time required for each task
Sequence tasks in proper order
Develop a start/stop time for each task
Develop detailed budget for each task
Assign tasks to people, subcontractors, etc.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-107
Example: Work Breakdown Structure (Figure 13.1)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
108
Control Activities and Decisions Monitor actual time, cost, and performance
Compare planned to actual figures
Determine whether corrective action is needed
Evaluate alternative corrective actions
Take appropriate corrective actions
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-109
Closing Activities and Decisions
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-110
Finish all work
Close contracts
Pay all accounts payable
Turn the project over to the owners
Reassign personnel and equipment
PMI - Body of Knowledge Integration Management
Scope Management
Schedule Management
Cost Management
Quality Management
Resource Management
Communications Management
Risk Management
Procurement Management
Stakeholder Management COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS
RESERVED. 13-111
Project Management Institute topics to understand for
certification as a Project Manager.
Scheduling Methods
Gantt Chart ◦ Bar charts
◦ Does not show interdependencies of activities
◦ Visual & easy to understand
Network Method ◦ Graphs or networks
◦ Shows precedence relations
◦ More complex, difficult to understand, and costly than Gantt charts
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-112
Gantt Chart Project Example (Figure 13.2)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-113
Constant-Time Networks
Activity times assumed to be constant
Activities represented by nodes
Arrows show precedence relationships
Notation used to calculate start and finish times: ◦ ES(a) = early start of activity A (constrained by predecessors)
◦ EF(a) = early finish of activity A (constrained by early start time)
◦ LS(a) = late start of activity A (constrained by late finish time)
◦ LF(a) = late finish of activity A (without delaying successors)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-114
Example: Write a Business Report (Table 13.4)
Activity Description Immediate
Predecessors Duration in Days
A Decide topic & scope None 1
B Collect data A 2
C Search the Internet A 3
D Write the report B and C 5
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-115
Network Diagram: Write a Business Plan (Figure 13.3)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-116
Forward Pass: Write a Business Plan (Figure 13.4)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-117
Calculating ES, EF, LS, LF, Completion Time
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-118
ES (a) = 0 for the starting activities
EF (a) = ES(a) + t(a)*
ES (a) = Max [EF(all predecessors of a)]
Project completion time = Max [EF(all ending activities)]
* t(a) denotes the duration of activity a
LF (a) = Min [LS(all successors of a)]
LS (a) = LF(a) - t(a)*
Forward Pass:
Backward pass:
Forward and Backward Pass: Write a Business Plan (Figure 13.5)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-119
Critical Path
Critical Path = longest path in the network
◦ All activities for which ES=LS and EF=LF
◦ Duration of critical path is equal to the project completion time
◦ Any delay on critical path delays the project
(unless ‘corrective actions’ are taken)
◦ Critical path in example (on previous slide) is A-C-D
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-120
Slack
•Slack time = time a path may be delayed without delaying the project
•Paths not on the critical path have slack.
•Slack = LS - ES = LF - EF
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-121
Precedence and Times for Opening a New Office (Table 13.5)
Activity Description Immediate Predecessors
Activity Time
Computed Slack
1 Lease the site None 1 0
2 Hire the workers 1 5 0
3 Arrange for furnishings 1 1 1
4 Install furnishings 3 2 1
5 Arrange for phones 1 1 3
6 Install the phones 4, 5 1 1
7 Move into the office 2, 6, 4 2 0
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-122
Network: Open a New Office (Figure 13.6)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 13-123
1 1
2 5
4 2
3 1
ES EF
LS LF
7 26
1 5 1
1 6
1 6
0 1
0 1
1 2
4 5
1 2
2 3
6 8
6 8
3 5
4 5
5 6
2 4
Critical Path Method
Critical Path Method (CPM)
Developed to start-up/shutdown plants.
Activity times can be compressed by spending more $.
Requires single time estimate for each activity.
Looks at time/cost trade-offs: ◦ Normal activity time
◦ Normal cost
◦ Crash time
◦ Crash cost
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-124
Time-Cost Relationship in CPM (Figure 13.8)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-125
Crash cost
C o
st
Normal cost
Crash time
Normal time
Time
Use of Project Management Concepts
Scheduling is only part of a complete approach to project management.
Trade-off between sophistication and cost of methods.
Choice between constant-time, CPM or more advanced techniques.
Choice of project management software packages.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-126
Example: Carlsbad Desalination Plant
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
127
This plant provides fresh water to the San Diego County Water Authority. The project cost $1 billion for the plant, pipelines, and upgrades to existing facilities.
A variety of project management tools were necessary to manage the long and detailed construction schedule – 2500 workers contributed 1.5 million hours.
For additional details on this project, see the Operations Leader box in the textbook.
Reed Kaestner/Getty Images
Chapter 13 Summary
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
13-128
LO 13.1 Explain the nature of tradeoffs among the three objectives of project management.
LO 13.2 Describe the four activities included in project management.
LO 13.3 Distinguish the advantages and disadvantages of a network over a Gantt chart for project scheduling.
LO 13.4 Calculate the ES, EF, LS, LF for an example network.
LO 13.5 Explain the significance of the critical path and slack.
LO 13.6 Calculate the cost of crashing a network by one or two days.
LO 13.7 Contrast and compare the use of constant-time and CPM networks.
Questions for Discussion
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
129
•How is taking a class similar to managing a project?
•Review the example of work breakdown structure for a banquet. Define the categories for a project such as making a movie.
•What are the tradeoffs between the budget and schedule for a project?
•In the Project Mgmt Institute Body of Knowledge, the newest category is stakeholder management. Who are the stakeholders?
•In your own words, explain the difference between early and late start times. Same for early and late finish times.
•Why is the critical path important? Why is slack important?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-130
Chapter 14:
Independent Demand Inventory
McGraw-Hill Education
Chapter 14 Learning Objectives
LO 14.1 Define inventory types and the purpose of inventory.
LO 14.2 Explain the costs incurred by inventory.
LO 14.3 Differentiate between independent and dependent demand.
LO 14.4 Calculate the economic order quantity and identify the underlying assumptions.
LO 14.5 Compute the parameters for a continuous review and periodic review inventory control system.
LO 14.6 Explain how continuous and periodic review systems are used in practice.
LO 14.7 Describe how inventory and service level are related.
LO 14.8 Define vendor managed inventory (VMI) and the ABC system.
LO 14.9 Solve advanced inventory problems (chapter supplement).COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-131
Definitions
Types of inventory ◦ Raw materials, purchased parts (RM)
◦ Work in process (WIP)
◦ Finished goods (FG)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-132
Inventory A stock of materials used to facilitate production or satisfy customer demands.
Inventory Management Technologies
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-133
Bar coding Point of sale (POS) data
Radio-frequency identification (RFID)
Target is an Operations Leader in using technology and point-of-sale (POS) data for inventory management.
artzenter/Shutterstock
Materials-Flow Process (Figure 14.1)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 14-134
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-135
Water Tank Analogy for Inventory
Supply Rate Inventory Level
Demand Rate
Inventory Level
Purpose of Inventories
To protect against uncertainties - demand, supply, lead times, schedule changes ◦ Safety stock
To allow economic production and purchase ◦ Cycle inventory
To cover anticipated changes in demand/supply ◦ Anticipation inventory
To provide for transit ◦ Pipeline inventory
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-136
Costs of Inventory (1 of 2)
Item cost ◦ Expressed as cost per unit or SKU
◦ Quantity discounts possible
Ordering (or setup) cost ◦ Paperwork, data entry, worker time for ordering
◦ Worker time for setup, downtime
◦ Transportation costs
◦ Typically a fixed cost per order (or setup)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-137
Costs of Inventory (2 of 2)
Carrying (or holding) cost ◦ Cost of capital (market rate or internal rate of return) ◦ Cost of storage (space, insurance, taxes) ◦ Cost of obsolescence, deterioration, and loss (shrinkage)
◦ Estimated U.S. average is 35% of SKU cost per year. ◦ Businesses often use cost of capital (under-estimate of true costs).
Stockout cost ◦ Back order costs (expressed as a fixed cost per backorder) ◦ Lost income ◦ Customer dissatisfaction; loss of future sales
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-138
Types of Demand
Independent demand (this chapter) ◦ Finished goods, spare parts ◦ Demand comes from the market, independent of other items ◦ Requires forecasting
Dependent demand (Chapter 15) ◦ Components/parts of the finished (parent) products ◦ Demand is a known function of (parent) independent demand items ◦ Calculate, instead of forecast
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-139
Demand Patterns (Figure 14.4)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-140
A pattern plus random influences
‘Lumpy’ due to production lots
Economic Order Quantity (EOQ)
Answers question: “How much should we order?”
Used for independent demand items.
Objective is to find order quantity (Q) that minimizes total cost (TC) of managing inventory.
Must calculate for each SKU.
Widely used and very robust (i.e., works well in a variety of situations, even when its assumptions do not perfectly hold).
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-141
EOQ Assumptions 1. Demand rate is constant, recurring, and known.
2. Lead time is constant and known.
3. No stockouts allowed.
4. Items are ordered or produced in a lot or batch, and the lot is received all at once.
5. Costs are constant: Unit cost (no quantity discounts).
Carrying cost is constant per unit. Ordering (setup) cost per order.
6. Item is a single product or SKU; demand not influenced by other items.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-142
EOQ Lot Size Intuition
There is a trade-off between ordering frequency (i.e., order size) and the inventory level.
◦ Frequent orders (small lot sizes) lead to a lower average inventory level, i.e., higher total ordering costs and lower total holding costs.
◦ Less frequent orders (large lot sizes) lead to a higher average inventory level, i.e., lower total ordering costs and higher total holding costs.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-143
EOQ Inventory Levels (Figure 14.5)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-144
Notation in EOQ Calculation
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-145
D = Demand rate, units per year
S = Cost per order or setup cost, dollars per order
C = Unit cost, dollars per unit
i = Carrying rate, percent of dollar value per year
Q = Lot size, units
TC = Sum of ordering cost & carrying cost, dollars per year
Cost Equations in EOQ
Ordering cost per year = SD/Q
(cost per order) x (orders per year)
Carrying cost per year = iCQ/2
(annual carrying rate) x (unit cost) x (average inventory level)
Total annual cost (TC) = SD/Q + iCQ/2
(total ordering cost per year) + (total carrying cost per year)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-146
Total Cost of Inventory (Figure 14.6)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-147
EOQ Formula
At the EOQ:
ordering costs = holding costs
S*(D/Q) = iC*(Q/2)
EOQ =
Note: Although we use annual costs, any time period can be used. Just be consistent throughout the equation! The same is true for currencies.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-148 15-148
EOQ Example
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 14-149
Demand = 10 cases/week S = $12/order i = 30% per year C = $80/case
= 2*12*10*52) / (.3*80)
= 22.8 cases/order
EOQ = 2SD)/iC
EOQ Example
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-150
TC = ordering cost + holding cost
= SD/Q + iCQ/2 = 12*520/22.8 + .3*80*22.8/2
= 273.68 + 273.60 = $547.28/year
If ordering 22 cases/order, TC = $547.64 If ordering 23 cases/order, TC = $547.30
Demand = 10 cases/week S = $12/order i = 30% per year C = $80/case
EOQ Example
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-151
Total cost curve is quite flat near the optimal EOQ. Order size need not be exactly the EOQ to get cost advantages.
Total Inventory Cost
0
200
400
600
800
13 17 21 24 28 32 36 40
Order Size
D ol
la rs
Continuous Review (Q) System
Relax assumption of constant demand. Demand is assumed to be random.
Check inventory position each time there is demand (i.e., continuously).
If inventory position drops below Reorder point, place an order for the EOQ.
Also called fixed-order-quantity or Q system. (fixed order size is EOQ)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-152
Continuous Review (Q) System (Figure 14.7)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-153
R = Reorder point Q = Order quantity L = Lead time
Continuous Review (Q) System
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-154
Amount to order = EOQ
Order when inventory position = Reorder point
Reorder point is independent of EOQ! EOQ tells how much to order. Reorder point tells when to order.
R = Reorder point m = mean demand during lead time s = safety stock
Service Level When demand is random, reorder point must account for
desired service level (fill rate).
Service level can be defined several ways: ◦ Probability all customer orders are filled while waiting for supply order to arrive. ◦ Percentage of demand filled from stock. ◦ Percentage of time item is on hand.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-155
s = safety stock z = safety factor = standard deviation in demand during lead time
Probability Distribution of Demand over Lead Time (Figure 14.8)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-156
m = mean demand
R = Reorder point
s = safety stock
Periodic Review (P) System
Review inventory position at fixed interval (P). For example, bread delivery truck visits grocery stores
on same days each week.
Inventory brought up to a Target level.
Order quantity varies according to demand.
Also called fixed-order-interval system or P system.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-157
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-158
Periodic Review (P) System (Figure 14.9)
T = target level Q = order quantities L = lead time P = time between orders (period)
Periodic Review (P) System
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-159
P = time between orders
T = target inventory level
P System Service Level
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-160
Safety stock must cover a longer interval: (P + L)
Service Level versus Inventory Level (Figure 14.10)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-161
Using P and Q System in Practice
Use P system when orders must be placed at specified intervals.
Use P systems when multiple items ordered from the same supplier (joint-replenishment).
Use Q system for expensive items; P for inexpensive.
P requires more safety stock (and is more likely to stockout) since the system cannot respond quickly to increased demand.
Either may be more costly: P in safety stock, Q in monitoring costs.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-162
P and Q Systems at Home
P system: You go to the grocery store on the same day every week.
“What will we need for the next week?” • P carries more inventory and is more likely to run out since it cannot respond
quickly to increases in demand.
•Q system: You go to the grocery store each time you need something.
“What do we need?” ◦ Q may require more unplanned trips to the store.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-163
Vendor Managed Inventory (VMI)
Supply chain management initiative shifting responsibility for managing inventory stocks to vendors (suppliers).
Vendor must have access to buyer’s demand forecast and inventory records.
Managed through contractual arrangement.
Supply chain partners share cost savings of collaboration.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-164
See the Operations Leader box in the textbook for how P&G, maker of Tide, uses VMI to improve supply chain performance.
Roberto Machado Noa/Contributor/Getty Images
ABC Inventory Management Based on Pareto concept (80/20 rule) and total usage in dollars of each item.
Classification of A, B, and C items based on usage.
Purpose is to set effort priorities to manage different SKUs, i.e., to allocate scarce management resources.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-165
A B C
A B C
Proportion of items
Proportion of value
ABC Inventory Classification
A items: 20% of SKUs, 80% of dollars
B items: 30% of SKUs, 15% of dollars
C items: 50% of SKUs, 5% of dollars
Three classes is arbitrary; could be any number.
Percentages are approximate.
Danger: ◦ Dollar use may not reflect importance of a particular SKU! Some firms
classify critical but low value items as A.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-166
Annual Usage of Items by Dollar Value (Table 14.4)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-167
ABC Chart for Table 14.4
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-168
A B C
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
40.0%
45.0%
3 6 9 2 4 1 10 8 5 7
Item No.
P e
rc e
n t
U sa
g e
0.0%
20.0%
40.0%
60.0%
80.0%
100.0%
120.0%
C u
m u
la ti
ve %
U sa
g e
Percentage of Total Dollar Usage Cumulative Percentage
Chapter 14 Summary
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
14-169
LO 14.1 Define inventory types and the purpose of inventory.
LO 14.2 Explain the costs incurred by inventory.
LO 14.3 Differentiate between independent and dependent demand.
LO 14.4 Calculate the economic order quantity and identify the underlying assumptions.
LO 14.5 Compute the parameters for a continuous review and periodic review inventory control system.
LO 14.6 Explain how continuous and periodic review systems are used in practice.
LO 14.7 Describe how inventory and service level are related.
LO 14.8 Define vendor managed inventory (VMI) and the ABC system.
LO 14.9 Solve advanced inventory problems (chapter supplement).
Questions for Discussion
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
170
•Why do firms have inventory?
•Why are different methods used to manage independent and dependent demand inventory items?
•Ordering (or setup) and carrying (or holding) costs are generally seen as tradeoffs. Explain this in your own words.
•Review the assumptions of the EOQ model. Why is each of them important in this calculation?
•How would you decide between using a Q system or a P system?
•What inventory items have you observed being stocked by the supplier (vendor managed inventory)?
•Considering ABC inventory classification, what types of raw materials do you think would be A items? B items? C items?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-171
Chapter 15:
Material Requirements Planning and ERP
McGraw-Hill Education
Chapter 15 Learning Objectives
LO 15.1 Define the elements, inputs, and outputs of an MRP system.
LO 15.2 Contrast and compare MRP vs. order-point systems.
LO 15.3 Construct a materials plan given the gross requirements.
LO 15.4 Describe in detail each element of an MRP system.
LO 15.5 Discuss DRP and different ways to deal with uncertain demand.
LO 15.6 Explain the five requirements for a successful MRP system.
LO 15.7 Describe what an ERP system does.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-172
Materials Requirements Planning (MRP)
• Used to manage dependent demand items • Plans the timing of materials, parts • Plans the quantity of materials, parts
• Based on master schedule (which is driven by S&OP)
• Parts explosion breaks end (parent) items into requirements for materials, parts based on bill of materials (BOM)
• Schedule is offset based on lead times
• Push system based on meeting the master schedule
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-173
Firm orders from Customers Sister plants Stock replenishment
Engineering design changes
Bill of materials
Forecast of demand
Purchase orders
Suppliers
MRP parts explosion
Capacity planning
Shop orders
Shop-floor control
Master schedule
S&OP
Operations Product Raw materials
Inventory records
Inv. transactions
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-174
Closed Loop MRP System (Figure 15.1)
Comparison of MRP & Order-Point Systems
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-175
MRP Elements
Inputs 1. Master schedule
2. Bill of materials (BOM)
3. Inventory records
Outputs 1. Capacity planning
2. Purchasing
3. Shop-floor control
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-176
3M implemented two applications, JDA Factory Planner and JDA Supply Chain Planner, across all factories in Canada.
MRP Example
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-177
Top
Leg
Long rail
Short rail
Bill of Materials (BOM)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-178
Short rails (2) 1 week
Table (end item) 1 week
Long rails (2) 1 week
Legs (4) 1 week
Top (1) 2 weeks
Leg assembly (1) 1 week
Indented BOM Level Code Component
0 Table (end-item)
1 Leg assembly (1)
2 Short rails (2)
2 Long rails (2)
2 Legs (4)
1 Top(1)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-179
Materials plan for BOM Levels 0 and 1
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-180
Week
1 2 3 4 5 6
Tables
On hand = 50 Gross Requirement 200 150 100
LT = 1 wk Scheduled Receipts
Lot size: L4L Projected Ending Inventory 50
Saftey Stock = 0 Net Requirement
Planned order receipts
Planned order releases
Tops
On hand = 50 Gross Requirement
LT = 2 wk Scheduled Receipts 50
Lot size: L4L Projected Ending Inventory 50
Saftey Stock = 0 Net Requirement
Planned order receipts
Planned order releases
Leg Assembly
On hand = 100 Gross Requirement
LT = 1 wk Scheduled Receipts
Lot size: L4L Projected Ending Inventory 100
Saftey Stock = 0 Net Requirement
Planned order receipts
Planned order releases
Materials plan for BOM Levels 0 and 1
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-181
Week
1 2 3 4 5 6
Tables
On hand = 50 Gross Requirement 200 150 100
LT = 1 wk Scheduled Receipts
Lot size: L4L Projected Ending Inventory 50 50 50
Saftey Stock = 0 Net Requirement 150 150 100
Planned order receipts 150 150 100
Planned order releases 150 150 100
Tops
On hand = 50 Gross Requirement 150 150 100
LT = 2 wk Scheduled Receipts 50
Lot size: L4L Projected Ending Inventory 50 100
Saftey Stock = 0 Net Requirement 50 150 100
Planned order receipts 50 150 100
Planned order releases 50 150 100
Leg Assembly
On hand = 100 Gross Requirement 150 150 100
LT = 1 wk Scheduled Receipts
Lot size: L4L Projected Ending Inventory 100 100
Saftey Stock = 0 Net Requirement 50 150 100
Planned order receipts 50 150 100
Planned order releases 50 150 100
Materials Plan (previous slide)
Gross requirements in level 0 (Tables) come from the master schedule.
Gross requirements in level 1 (Tops, Leg assemblies) come from the planned order releases in level 0.
Planned order releases are offset by the lead times.
Planned order releases are planned! Actual order releases must take available capacity into account.
Net requirements are the gross requirements minus the projected ending inventory.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-182
MRP System Elements: Master Schedule
Quantities are derived from the aggregate production plan (product families).
Schedule should be frozen within production lead time (so all parts can be obtained).
Quantities reflect “build” (produce) schedule rather than demand forecasts.
Quantities represent what needs to be produced (infinite capacity assumed).
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-183
MRP System Elements: Bill of Materials (BOM)
Structured list of all parts and materials.
Must be 100 percent accurate.
Should be one BOM per product per company.
Engineering-change-order (ECO) system used to update BOM as product redesigned.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-184
MRP System Elements: Inventory Records
Item master data segment ◦ Constant info (part number, cost, etc.)
Inventory status segment ◦ Materials plan for each item
Subsidiary data segment ◦ Info on outstanding orders, demand history, etc.
Records must be accurate ◦ Cycle counting: physical count of a few items each
day, so that all items are counted on a regular cycle
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-185
Alistair Berg/Digital Vision/Getty Images
MRP System Elements: Capacity Planning
Purpose is to aid management in checking validity of master schedule
◦ Is there enough capacity to produce as scheduled?
Two methods ◦ Shop loading: assign work to work centers
◦ Finite capacity scheduling: considers resource limitations
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-186
MRP System Elements: Purchasing
o MRP system generates orders
o Past due orders mostly eliminated
o Order expediting mostly eliminated
o Can provide suppliers with reports of planned future orders
o Can use electronic data interchange (EDI) to communicate directly with suppliers
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-187
MRP System Elements: Shop Floor Control
Purposes: ◦ Release orders to the shop floor
◦ Manage the orders for on-time completion ◦ Can use manufacturing execution system (MES)
Set job priorities (dispatching rules)
Manage lead times on basis of priority ◦ Expedite and de-expedite orders
Minimize inventory while meeting completion dates
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-188
Operating an MRP System
Should MRP carry safety stock?
How much safety stock should be carried?
Safety lead time, safety capacity
Expand downstream in supply chain: ◦ Distribution Requirements Planning (DRP)
Use upstream to give suppliers visibility into schedule.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-189
Successful MRP System
1. Implementation planning
2. Appropriate and adequate IT support
3. Accurate data
4. Management support
5. User knowledge (all levels of firm)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-190
MRP in Services
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
191
MRP systems can be used for services too.
In renovating hotel rooms, Marriott develops a bill of materials and a bill of labor for each room type and then “explodes” the bill throughout the hotel facility to summarize its furniture and decorating needs.
Onoky/SuperStock
Enterprise Resource Planning (ERP) Systems
Extension and integration of all functions through shared data systems.
Forces standardized systems throughout firm: Accounting controls systems Marketing and sales transactions Human resource planning and payroll transactions
Coordinate decisions along the supply chain.
Major software vendors: SAP, Oracle
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-192
ERP System Example
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
193
Global giant LG Electronics has 114 subsidiaries and more than 82,000 employees across 40 countries. Data management challenges made it difficult for LG to operate as a global company in the past.
Their ERP solution supports the following benefits: centrally managed systems, process transparency, sharing best practices, and real-time reporting for upper management for informed decision making.
Kobby Dagan/123RF
Chapter 15 Summary
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
15-194
LO 15.1 Define the elements, inputs, and outputs of an MRP system.
LO 15.2 Contrast and compare MRP vs. order-point systems.
LO 15.3 Construct a materials plan given the gross requirements.
LO 15.4 Describe in detail each element of an MRP system.
LO 15.5 Discuss DRP and different ways to deal with uncertain demand.
LO 15.6 Explain the five requirements for a successful MRP system.
LO 15.7 Describe what an ERP system does.
Questions for Discussion
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
195
•In your own words, what is the purpose of an MRP system?
•What information is provided by each of the “inputs” into an MRP system? (Figure 15.1 in the textbook shows these inputs.)
•Why is inventory management so different for dependent demand items?
•Consider a simple product that you have handy (pen, backpack, etc.). Draw a basic bill of materials for this item.
•Describe each of these: safety stock, safety lead time, and safety capacity.
•How are ERP systems different from MRP systems?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
16-196
Chapter 16:
Supply Chain Management
McGraw-Hill Education
Chapter 16 Learning Objectives
LO 16.1 Define supply chain and supply chain management.
LO 16.2 Review key measures of supply chain performance.
LO 16.3 Explain the bullwhip effect and how it can be reduced.
LO 16.4 Contrast structural and systems improvements.
LO 16.5 Evaluate the effect of technology on the supply chain.
LO 16.6 Define supply chain risk, resilience, and how risk can be managed.
LO 16.7 Describe supply chain sustainability.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
16-197
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
16-198
A SUPPLY CHAIN is the set of entities and relationships that cumulatively define material and information flows both downstream toward the customer and upstream toward the very first supplier.
“Supply chain management is the design and management of seamless, value-added processes across organizational boundaries to meet the real needs of the end customer.”
--Institute for Supply Management
Typical Supply Chain (Figure 1.1)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
16-199
Supply Chain - Focal Firm Perspective
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
16-200
Focal Firm 1st-tier
suppliers 2nd-tier
suppliers 3rd-tier
suppliers Distribution centers &
warehouses Retailers
Physical Supply Physical Distribution
Downstream or Forward Materials and Information Flow
Upstream or Backward Materials and Information Flow
Suppliers’ Supplier
Supplier
Plan
Customer Customer’s Customer
Make DeliverSource Make
DeliverMakeSourceDeliver SourceDeliver
Internal or External Internal or External
Your Company
Source
Return Return Return Return Return Return
Return Return
SCOR model = Supply Chain Operations Reference
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
16-201
The Five SCOR functions
Plan Coordinate the other functions.
Source Bring inputs into the transformation process from other organizations.
Make The operations function responsible for making the product or service.
Deliver The logistics function responsible for the movement and storage of goods across organizations in a supply chain.
Return Return and recycle inputs or products in the supply chain.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
16-202
Supply Chain Performance Measures
Throughput time Also called cycle time. Sum of throughput time in each supply chain entity (org).
Cash-to-cash cycle time Time it takes to get paid, once product is sold. = Days in inventory + days in accounts receivable - days in accounts payable
Total delivered cost Unit cost = total manufacturing cost, including materials, labor, and overhead, divided by the number of units produced. Supply chain cost = sum of cost of materials and components from suppliers, cost to fabricate and assemble, cost to ship materials and work-in-progress between firms, and cost to ship finished-goods inventory to customer.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
16-203
Measure: Throughput Time Example
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
204
Supplier Factory Wholesale Retail
Inventory days 10 30 15 5
Accounts receivable days 25 25 30 10
Accounts payable days 30 40 20 15
Sourcing unit cost $25 $40 $70 $90
Added unit cost $5 $20 $5 $20
Sales unit price $40 $70 $90 $120
Q: Calculate the total supply chain throughput time.
A: 10 + 30 + 15 + 5 = 60 days
Measure: Cash-to-Cash Cycle Time Example
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
205
Supplier Factory Wholesale Retail
Inventory days 10 30 15 5
Accounts receivable days 25 25 30 10
Accounts payable days 30 40 20 15
Sourcing unit cost $25 $40 $70 $90
Added unit cost $5 $20 $5 $20
Sales unit price $40 $70 $90 $120
Q: Compute the cash-to-cash cycle time for each supply chain entity.
A: Supplier = 10 + 25 – 30 = 5 days Wholesale = 15 + 30 – 20 = 25 days Factory = 30 + 25 – 40 = 15 days Retail = 5 + 10 – 15 = 0 days
Measure: Total Delivered Cost Example
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
206
Supplier Factory Wholesale Retail
Inventory days 10 30 15 5
Accounts receivable days 25 25 30 10
Accounts payable days 30 40 20 15
Sourcing unit cost $25 $40 $70 $90
Added unit cost $5 $20 $5 $20
Sales unit price $40 $70 $90 $120
Q: Compute the total delivered cost in the supply chain.
A: $25 + 5 + 20 + 5 + 20 = $75 Note, we start with the sourcing cost (unit + added) and then just sum the added cost at each stage. This calculation takes out all the profit at each stage.
Dynamics: Bullwhip Effect
Supply chain is a highly interactive system. Decisions in each part of the chain affect the other entities.
Accelerator (bullwhip) effect: Increased variability in upstream orders, resulting in more inventory upstream.
Even with perfect information, replenishment lead times lead to accelerator effect.
Improve supply chain by reducing total replenishment time, share real demand information with all entities.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
16-207
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
208
Bullwhip Effect (Figure 16.2)
The farther away a supply chain entity is, the greater is the variability of orders it places.
The same pattern of upstream magnification of order variability also describes inventory levels and stockouts across the four entities in this supply chain.
Improving Supply Chain Performance
◦ Change structure
◦ Decisions that involve investments in bricks and mortar (facilities, new products, technology, etc.)
◦ Change systems
◦ Decisions that involve people, process flow and information systems
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
16-209
Requires “coordination” within and across firms.
Structural Improvements
Forward and backward integration
Major process simplification
Supply base reduction
Outsourcing, offshoring
Major product redesign ◦ Postponement, modularity
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
16-210
System Improvements
Cross-functional teams and partnerships with suppliers and customers to increase coordination.
Lean systems for producers, suppliers and distribution
Integrated information systems, downstream and upstream
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
16-211
Technology and Supply Chain Management
Growth of e-commerce ◦ B2B (business-to-business)
◦ B2C (business-to-consumer)
Fundamental processes in supply chains: ◦ Order placement process
◦ Information before order (Is product available in stock?)
◦ Actual order entry
◦ Order fulfillment process ◦ Direct link to internal operations & suppliers
Use of analytics to improve supply chains
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
16-212
Technology and Supply Chain Management
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
16-213
E-commerce & Omni-channel
“Amazon” effect – pushing other retailers online.
Need seamless and error-free interactions across stores and online.
Need access via smartphones, tablets, desktop computers, and laptops.
Blockchain
Complete, shared, secure database of all transactions in the chain as a shipment moves from factory to destination.
BiTA (Blockchain in Transport Alliance) - over 200 companies using or considering blockchain.
Not yet widely used.
Supply Chain Risk and Resilience Resilience is the ability to quickly respond to unexpected disruptions in supply or demand, either natural or manmade.
◦ Examples of disruptions: strike, recession, sudden price change, natural disaster, manufacturing failure, unexpected demand.
Risk mitigation* ◦ Stage 1: Build resilience by creating a proactive plan
◦ Stage 2: Use agility to minimize damage during disruption
◦ Stage 3: Re-evaluate original plan during post-recovery
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
16-214
* Each stage requires strategic and operational planning.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
215
Supply Chain Mitigation Framework
Analysis of Supply Chain Risk
• Supply chain risk: probability of supply chain disruption.
• Risk can be reduced at each node in the network. • Add inventory at the supplier node or within firm. • Use two geographically dispersed suppliers. • For a sole source, have backup second supplier.
• Do not solely focus on the highest spend suppliers. Even missing supplies from small suppliers can add risk.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
10-216
Analysis of Supply Chain Risk (Figure 16.4)
For a given damage scenario, calculate for each supplier:
◦ TR = time to recover and meet full demand
◦ TS = maximum time supplier can meet demand during a disruption,
using inventory or alternate supply sources.
◦ Insure that TS > TR
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
10-217
Supply Chain Sustainability
Sustainability: meeting present needs without sacrificing the needs of future generations.
Triple bottom line: environmental, social, economic
3-phase approach:
1. Set environmental, social, and financial goals.
2. Develop long-range plans to meet goals with the suppliers.
3. Implement plans throughout the firm and its supply chain.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
10-218
Supply Chain Sustainability
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
10-219
Unpackaged is not your typical
grocery store. This London organic grocery store tells its customers to bring their own containers when they shop.
Customers bring bottles, glass jars, paper bags, plastic bags, and old boxes to carry their goods home. Inside the store, grocery items are stored in barrels, buckets and bins, and black tubs.
Cate Gillon/Getty Images
Chapter 16 Summary
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
16-220
LO 16.1 Define supply chain and supply chain management.
LO 16.2 Review key measures of supply chain performance.
LO 16.3 Explain the bullwhip effect and how it can be reduced.
LO 16.4 Contrast structural and systems improvements.
LO 16.5 Evaluate the effect of technology on the supply chain.
LO 16.6 Define supply chain risk, resilience, and how risk can be managed.
LO 16.7 Describe supply chain sustainability.
Questions for Discussion
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
221
•Explain why there are both downstream and upstream flows in supply chains. What are the differences?
•What are each of the activities included in the SCOR model?
•The chapter describes three ways to measure supply chain performance. What other ways could performance be measured?
•Describe the bullwhip effect in your own words.
•Look for examples of forward and backward integration. Why did these firms choose to extend their control of their supply chain?
•Have you personally experience supply chain disruptions? Where?
•Supply chains play an important role in sustainability. How can supply chains have more positive impact on the triple bottom line?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
18-222
Chapter 18:
Logistics
McGraw-Hill Education
Chapter 18 Learning Objectives
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 18-223
LO 18.1 Define the scope and purpose of logistics. LO 18.2 Explain transportation economics. LO 18.3 Compare the advantages and disadvantages of the five
modes of transportation. LO 18.4 Distinguish among the different functions of warehouses. LO 18.5 Describe how to determine the number and location of
warehouses. LO 18.6 Consider when a firm should use a third-party logistics
provider. LO 18.7 Define logistics strategy and explain why it is needed.
Logistics Definition
Includes: ◦ Inbound to firm
◦ Outbound from firm
◦ Warehousing (storage)
◦ Network design
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
18-224
Plans, implements, and controls the efficient, effective forward and reverse flows and storage of goods and related information between the point of origin and consumption in order to meet customer requirements.
Importance of Logistics
Strategic decisions linking marketing and operations
Operational decisions defining “place” and movement of goods
Integration with other functions ◦ Marketing to fulfill customer demand
◦ Information systems to link firm to suppliers and customers
◦ Finance for large investments in inventory, warehousing
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
18-225
Boundary spanning activities
Critical Logistics Decisions
What modes of transportation to use?
What types of warehousing to use?
Where should factories and warehouses be located?
Should logistics be outsourced to third-party provider (3PL)?
What is the strategic role of logistics in creating and supporting competitive advantage?
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
18-226
Transportation Economics Economies of scale
◦ Larger shipments cost
less per pound (than
smaller)
◦ Full truckloads cost
less per pound (than
partial)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
18-227
Economies of distance
◦ Longer distances cost
less per pound (than
shorter)
◦ Longer distances cost
less per mile (than
shorter)
Economies of speed
◦ Regular shipping costs
less per mile (than
expedited)
◦ Regular shipping costs
less per pound (than
expedited)
Transportation Economics Example
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
18-228
A company has three shipments of 10,000 pounds each going from different nearby cities to one retail store. The carrier charges $10 per hundredweight (cwt).
If the shipments are consolidated into one truck, the carrier will take the 30,000 pounds for $7 per cwt, but charges $300 each for the two extra stops.
Should the company consolidate the three shipments?
Cost to ship separately in three trucks is: Cost = 10,000 ($10/100 pounds)*(3 shipments) = $1,000 * 3 = $3,000
Cost to consolidate the three shipments is: Cost = 30,000 ($7/100 pounds) + $300*(2) = $2,100 + $600 = $2,700
Consolidating the shipments costs less.
Transportation Modes
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
229
Multimodal
Intermodal Drones??
Trucks Rail Air
Water • Ocean • Inland
Pipeline
mipan/123RF
Mode Use in U.S. (Figure 18.1)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
230
Transportation Decisions (Table 18.1)
Mode Advantages Disadvantages
Truck Can move freight quickly over long distances. Very flexible on locations. Easily linked with rail or air.
More expensive for heavy and bulky freight than other modes.
Rail Relatively inexpensive for long distances. Can be linked with truck or ocean freight.
Relatively slow.
Water (inland) Low cost for moving bulk commodities. Effective when linked to multimode.
Subject to proximity of waterway locations. Relatively slow.
Water (ocean) Cost-effective way to ship freight in containers over long distances.
Very slow.
Air Fast way to move freight. Flexible when linked to trucks.
Very expensive.
Pipeline Can move bulk commodities (oil, gas, and chemicals) for long distances.
Expensive to install.
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
18-231
Distribution Centers and Warehousing
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 18-232
Consolidation
Distribution Centers and Warehousing
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 18-233
Break-bulk
Distribution Centers and Warehousing
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 18-234
Cross-docking
Other Purposes of Distribution Centers and Warehousing
Managing seasonal demand
Supporting manufacturing Incoming raw materials
Outgoing finished goods
Providing value-added services
Handling reverse logistics
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
18-235
Logistics Networks - Location factors
• Labor availability
• Cost of labor
• Cost of construction and maintenance
• Cost of transportation
• Taxes
• Government incentives
• Government regulations
• Delivery time to customer
• Proximity to suppliers
• Highway and rail availability
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
18- 236
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 18-237
Logistics Network (Figure 18.3)
Center of Gravity Analytics
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
18- 238
First approximation to locate warehouses based on transportation costs and distances.
Model calculates the center-of-gravity based on the distances from warehouses to customers.
Center of Gravity - Example
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED. 18-239
Customer X coordinate Y Coordinate Demand (lbs)
A 10 10 5000
B 20 25 7500
C 25 35 6000
XCG = 10(5000) + 20(7500) + 25(6000) = 18.9 5000 + 7500 + 6000
YCG = 10(5000) + 25(7500) + 35(6000) = 24.2 5000 + 7500 + 6000
Center of Gravity - Example
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
240
The center of gravity is a logical location for a warehouse to serve Customers A, B, and C.
Number of Warehouses (Figure 18.4)
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
18- 241
Global Logistics
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
242
Complex transportation, usually multimodal
Complex information transfer: exporters, importers, freight forwarders, clearing agents, ocean shipping lines, freight companies, intermodal operators, banks, and insurance companies
ilfede/123RF
Global Logistics
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
243
Third-Party Logistics (3PL)
• Transportation services
• Warehousing services
• Inventory management services
• Reverse logistics services
• Access to logistics expertise
• Enhanced flexibility to changing markets/technology
• Lower cost than insourcing
• Humanitarian aid
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
18-244
Ryder is a major player in 3PL to more than 50,000 business customers, using their 5900 technicians, 7700 drivers, and 800 facilities.
Ryder is a 3PL provider to Cisco, helping them keep their warranty promise on 1.5 million parts every year.
John Crowe/Alamy Stock Photo
Logistics Strategy
Determine objectives ◦ Cost, delivery, service quality, flexibility
Ownership vs. outsourcing logistics function
Transportation modes
Warehousing network ◦ Number and location of facilities
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
18-245
Chapter 18 Summary
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
18-246
LO 18.1 Define the scope and purpose of logistics. LO 18.2 Explain transportation economics. LO 18.3 Compare the advantages and disadvantages of the five
modes of transportation. LO 18.4 Distinguish among the different functions of warehouses. LO 18.5 Describe how to determine the number and location of
warehouses. LO 18.6 Consider when a firm should use a third-party logistics
provider. LO 18.7 Define logistics strategy and explain why it is needed.
Questions for Discussion
COPYRIGHT © 2022 BY THE MCGRAW-HILL COMPANIES, INC. ALL RIGHTS RESERVED.
247
•Describe different types of logistics that you have personally observed. Where did you see them? What were they doing?
•How does a firm choose its modes of transportation to move its goods?
•When would a firm use these various types of warehouses: consolidation, break-bulk, cross-docking?
•When is reverse logistics used? How does it work?
•In your own words, what is a logistics network?
•Beyond knowing the ‘center of gravity’ in a network, what other factors should be considered when choosing a warehouse location?
•What types of services are carried out by third-party logistics (3PL) providers?