Managerial Finance Assignment
Department of Architecture and the Built Environment
University of the West of England
Postgraduate Level
MSc Real Estate Management
Managerial Finance for the Built Environment
Coursework
Managerial Finance for the Built Environment 2021-22
Page | 1 of 6
Purpose
The coursework is intended to provide you with the opportunity to demonstrate understanding and integration of the various aspects of the
programme and this module. The aim should be to obtain, analyse and
interpret financial information; assess the financial viability of a project and
integrate them into a balanced
decision-making framework.
Project Brief:
MF4BE, a leading local housing
developer of the South West is considering a new housing
development to be built under a quasi- social housing agreement with a
national house-building firm. Several sites were identified in the initial
feasibility studies, however, many of these required substantial demolitions
of existing dwelling houses and relocation during construction and
have thus been rejected. Source: http://www.eastofharrystoke.com/proposals/
Managerial Finance for the Built Environment 2021-22
Page | 2 of 6
The proposed development will take place on a site in a new neighbourhood
called East of Harry Stoke (EoHS) situated on the urban edge of north
Bristol near the University of the West of England and close to the M32 and M4 motorways. This site is mostly owned by Crest Nicholson and South
Gloucestershire Council who intend to deliver about 2000 houses; while some parts are owned by other private landowners. MF4BE has purchased
3.125 hectares of the EoHS land from the private landowners for £3.5 million per hectare to enable it to carry out this development. MF4BE plans
to develop the site to provide a mix of housing (including family housing, flats and sheltered accommodation), together with commercial uses in
future and also provide some open spaces. In keeping with this, the average dwelling per hectare (density) for this development should NOT
exceed 32.
To achieve this undertaking, MF4BE is considering engaging a reputable construction company or housebuilder from a list of firms that have
expressed interest. MF4BE is also considering taking a stake in a construction company or housebuilder as part of its long-term expansion
goals of accessing other income.
You are required to provide a report that will contain the following:
Part 1: 60 Marks
Assessment of suitability of the construction or housebuilder firm
(1800 words)
You are required to obtain the most recently published “FULL ANNUAL REPORT” for an exisiting construction company or housebuilder of your
choice. The annual report must be for a UK PLC that is listed on the UK
Stock Exchange and must be in the English language.
You are required to assess the suitability of the chosen construction
company or housebuilder, both as a building contractor and a potential investment, by preparing a report on the financial “health” of this company.
This should be done by making use of financial ratios as revealed or implied by the most recent FULL annual report and its financial statements. Your
report should be clear and succinct as if prepared for your boss (with no
accounting knowledge) who is a very busy person with limited time to read it before an important meeting. All relevant information in the annual
report should be used as necessary.
The detailed calculations of all ratios must be shown in FULL and must be
attached separately as part of the Appendices either in Microsoft Word or
Microsoft Excel (Note: Please only restrict yourself to the ratios covered in class). A complete copy of the FULL ANNUAL REPORT must
be attached as a separate file in the submission. Please DO NOT use the
interim (half-year) annual report.
Managerial Finance for the Built Environment 2021-22
Page | 3 of 6
The full annual report can be obtained online from the respective
company’s website or by carrying out a search using your preferred
internet “search engine". You can use FAME (a database accessible through the UWE Library webpage) to check that the company is a PLC. Note that
FAME should only be used to compare the ratios but all the ratios should be
calculated manually.
Part 2: 40 Marks
Development decision making (1200 words)
You are required to propose a choice of two (2) housing schemes on the site for MF4BE to pick from. Decide on the total number of residential
dwellings proposed for this site and the housing mix and types (e.g. 1 bedroom, 2 bedrooms etc). Note: a minimum of three house types is
required for both proposed schemes.
a. Undertake breakeven analyses (charts included) based on only the development of houses on both of the proposed schemes. Based on the
breakeven analyses, advise MF4BE which of the two schemes is the best.
Market information can be gleaned from a variety of databases e.g. “Rightmove” that will provide reasonable comparables. Cost information
can be obtained from sources such as the Building Cost Information Service
(BCIS) or Spon’s.
(18 marks)
b. With the use of the information from (a) above, advise MF4BE on the
viability of the two proposed schemes by carrying out capital budgeting using the Return of Capital Employed (ROCE), Payback Period (PP), Net
Present Value (NPV) and Internal Rate of Return (IRR). Discuss which of these appraisal methods IS the most suitable for this task and advise
which of the two proposed schemes is the best.
Make appropriate assumptions regarding the timing of the construction and
sale of the units.
(22 marks)
The full report should include, among other things:
• One-page executive summary of both Part 1 and Part 2- containing the
key features and results of the report. This should be on a separate page placed at the beginning of the report
• A brief introductory section
Managerial Finance for the Built Environment 2021-22
Page | 4 of 6
• Numerical investigation
• Findings - analysis and interpretation of results
• Solutions, conclusions and recommendations • References (ensure that you use the Harvard System check the UWE
library website for guidance) • Appendices – these should be used appropriately to show the workings
(Calculations for Part 2 should be done in MS Excel) and should be limited to information supporting the report. Definitions of ratios should
be within the report while ensuring that important information is not relegated to the appendices
Style
The typed report should be complete, coherent, clear and concise (maximum 3,000 words with a 10% allowance – see the University's policy
on word count) making good use of headings, tables, graphs, diagrams, page numbers etc., and presented professionally with balanced use of
appendices, contents listings, proper referencing, bibliography, word count, etc. material in the appendices. The report should be predominately
analytical rather than descriptive.
Coursework hand-in
The coursework should be handed ONLINE (electronically) following
normal Faculty practice BEFORE 14.00hrs on Thursday, April 28th,
2022. Note that you will be penalised if your work is submitted even one
(1) second after the 14.00hrs.
The most significant point to stress at this time is that your submission
must consist of three electronic files: -
1. The report containing both parts 1 and 2 and any appendices MUST
be submitted as a single MS WORD document. 2. A single spreadsheet file (MS Excel or similar) containing (at least)
two (2) separate worksheets (labelled appropriately) for the appendices of all the calculations.
3. The pdf file of the FULL ANNUAL REPORT
Note: Please DO NOT just paste pictures of extracts of the Excel file since we will need to see your calculations. Ensure that this Excel file is uploaded
as a separate file and DO NOT EMBED it in the MS WORD file – embedded files that cannot open will be deemed as missing and therefore making your
work incomplete.
Electronic Submission
Full instructions will be provided about 4 weeks before submission. Ensure
that you read the submission instructions carefully.
Managerial Finance for the Built Environment 2021-22
Page | 5 of 6
Hard copy submissions are NOT accepted under any circumstances.
Please do not leave submission to the last day. Computer and internet
connection problems are not acceptable grounds for Personal Circumstances. Anticipate that very close to the deadline blackboard usage
will surge and may cause upload speed issues.
The electronic format provides the ability for word counts to be completed. Anything more than 10% over the limit (not including any covering note)
will not be marked. This will leave your submission incomplete and
disjointed; this will be a major penalty.
The electronic submission also provides the marker with the ability to
process the whole batch of assignments through a piece of software called ‘safe assign’. This will compare the text in every assignment against
available electronic resources AND compare it to all the other submissions
in the batch.
Best wishes
Managerial Finance for the Built Environment 2021-22
Page | 6 of 6
Guideline assessment criteria for postgraduate work
Student Performance Formative work Summative work % Level M
A full, coherent and well- rounded submission showing rigour, clarity and insights leading to elements of originality
Excellent 80-100
'Starred' Distinction
A well-structured, relevant piece of work based on an understanding of virtually all the important aspects, with good reasoning and insight, expressed throughout, that wholly supports the conclusions or solutions
Very good 70-79
Distinction
A submission that is well focused on the task, showing a good grasp of the subject and based on most of the important aspects being well integrated into the work with reasoned outcomes
Good 60-69 Merit
Reasonable coverage of the subject matter demonstrating logic and reasoning that is directed towards meeting the aims of the task
Good
55-60
'Solid' Pass
Work showing a grasp of the subject matter, having some omissions and confusions but in which the work presented is used to support conclusions and/or solutions
Barely
satisfactory
50-54
Bare Pass
Some of the relevant material is identified and there is some indication of an appreciation of the subject matter but with significant omissions, poorly structured and weak conclusion/solutions
Weak
40-49
Fail / Area of
Compensation at
Component Level
Work with a few relevant aspects of the subject matter, poorly linked together and lacking direction in addressing the question and providing no support for conclusions
Very weak
30-39
Fail
Very little of relevance to the question with an absence of focus and largely incoherent with little sign of understanding, leading to an inability to draw meaningful conclusions
Unacceptable Unacceptable