Running Head: D1 2

D1 2

Assignment/Project Cover Sheet

Grade:

Course Code/Title : ME 323

Section Number : O6

Instructor Name : Mehmet Guler

Semester/Year : Fall 2020 -2021

Assignment/Project Report Title: Deliverable 1

Due Date: 15 of Dec /2020

Submission Date: 15 of Dec / 2020

Student Name(s)

Student ID Number

Zainab Baqer

Anwar Alnajjar

Maram Almutairti

37376

37161

41666

Please list any others who contributed to this assignment/ lab report:

_____________________________________

_____________________________________

Student declaration:

By signing below, I attest that I wrote this assignment\lab report alone or with the help of the students I have listed above.  I understand that any act of plagiarism will be treated as an academic misconduct for which provisions stipulated in the Student Code of Conduct should apply.

Students’ Signature

Table of contents

Abstract………………………………………………………………3

Introduction ………………………………………………………….4

Function of team leader and team members………………………….4

Minutes of meeting …………………………………………………...5

Gantt chart …………………………………………………………….6

Abstract

in this project we are going to deal with body-building equipment ( body solid bicep / triceps machine ) so we will be able to analyze all forms of stresses and deformations in the structure, we will draw the sketch of steel arm ABCDEF and indicate different forces and moments. Also, define the maximum force that the athlete can apply at both handles with defining the materials used in the arm. And we will consider the structure as fixed at portion EF and apply required stress analysis at the design critical points by determining in all the members. In Addition, we will select the maximum normal and calculate the factor of safety of the machine. Finally, we will be able to explain how each member have contributed in Gantt Chart.

Introduction

Sports equipment is highly user-centered to improve the sporting performance of an athlete, so when we design any sports machine, we have to design all the components of the machine properly. In this project, we are required to analyze the body-building equipment (body solid bicep/tricep machine). And we should apply stress and deformation analysis to evaluate and calculate the maximum stress, deformation, and the factor of safety.

Function of team leader and team members

We made a meeting to discuss in details the project with the members of the team, and selected “Zainab” as the leader of the group, and Maram and Anwar as members of the team. Also, the tasks were issued in the following table:

Tasks

Member

D1 report

All members of the group

Describe the problem

Zainab

Researching data

Anwar

Sketching the arm

Maram

Calculations

All members of the group

Power point

Maram

Meeting Notes

Organizer:

Zainab Baqer

Date & Time:

15/12/2020 at 1:00 PM

Meeting Type:

Project Deliverable 1

Location:

WhatsApp

Attendees:

All group members

Meeting purpose and setup:

We made a meeting to organize our teamwork and to clarify what each member of us is going to do in this project and which task are we going to deal with. We made deliverable (1) in 1:00 PM because there was enough time to work with the project. Zainab is the group leader and she will describe the problem of this project while Anwar is going to research data. And Maram is going to deal with sketching the arm. Lastly, calculations will be a team work between us because it will need more time than the other tasks.

Tasks

Notes and action items

· D1

Regarding D1, we are going to list the function of the leader and the members of the group as well. Also, we are going to make a minute of meeting and explain each task how time it can take to be done and accomplished. Also, we are going to create a Gantt chart.

· D2

In respect to d2, we’re going to describe the problem, researching data, and sketching the data. All of these tasks will be accomplished individually. But the calculations are going to be done by all of the members group, because it will take time to be done.

· D3

Finally, d3 is about presenting the project by using the power point

Tasks

Date of meeting

Duration

Pd1

15/12/2020

4

Meeting

15/12/2020

4

Debating project administration issues

15/12/2020

4

Pd2

20/1/2021

6

Hand calculations

21/1/2021

5

simulation

23/1/2021

3

report

24/1/2021

2

Pd3

27/1/2021

4

Presentation

27/1/2021

4