a. Determine the total setup time
b. Determine the total operating time available
c. Determine the number of assembly lines
Research the Product and Service Matrixes on pages 144 and 150, then research and
develop a table
that
compares and contrasts the matrixes
(at least 2 sources required). How are these matrixes similar and also different? (
See grading rubrics)
Assignment
2
Best Bicycles Problem
Best’s Bicycles manufactures three different types of bikes: the Tiny Tike, t
he Adult Aero, and the
Mountain
Monger. Given the information in the table, calculate the required capacity for this year’s
production. Note that the times are given for assembly lines, so capacity calculations should be in terms
of the number of lines necessary. Assume that Best Bicycles operates three shifts, each with 2,000 hours
per year.
a.
De
termine the total
setup t
ime
b.
Determine the total operating time available
c.
Determine the number of assembly lines
1.
Complete the problem attached above regarding Best's Bicycles Problem
(
See grading
rubrics)
2.
Write a 2 page paper that summarizes the use of the following new product
development method (using memo or APA format
-
use 2
external
referen
ces):
Stage
-
Gate Process
-
Review the Stage
-
Gate video
(
https://davenport.blackboard.com/bbcswebdav/pid
-
9109612
-
dt
-
content
-
rid
-
49460187_2/xid
-
49460187_2
)
and explanation of the process on pages 122
-
123 in the course text, then
research
at least 2 professional or peer
-
reviewed sources
that provide an example of the development and
commercialization of
an innovative new product (example the Tesla auto in 2002).
(
See grading
rubrics)
3.
Product and Service Process
Matrixes
Research the Product and Service
Matrixes
on pages 144 and 150, then research and
develop a
table
that
compares and contrasts the
matrixes
(at least 2 sources required)
.
How are
these
matrixes
similar and also different?
(
See grading rubrics)
Note:
Students only need to submit 1 MS Word document that combines all assignments.
15
18
25
Assignment 2
Best Bicycles Problem
Best’s Bicycles manufactures three different types of bikes: the Tiny Tike, the Adult Aero, and the
Mountain Monger. Given the information in the table, calculate the required capacity for this year’s
production. Note that the times are given for assembly lines, so capacity calculations should be in terms
of the number of lines necessary. Assume that Best Bicycles operates three shifts, each with 2,000 hours
per year.
a. Determine the total setup time
b. Determine the total operating time available
c. Determine the number of assembly lines
1. Complete the problem attached above regarding Best's Bicycles Problem (See grading
rubrics)
2. Write a 2 page paper that summarizes the use of the following new product
development method (using memo or APA format - use 2 external references):
Stage-Gate Process - Review the Stage-Gate video
(https://davenport.blackboard.com/bbcswebdav/pid-9109612-dt-content-rid-49460187_2/xid-
49460187_2) and explanation of the process on pages 122-123 in the course text, then research
at least 2 professional or peer-reviewed sources that provide an example of the development and
commercialization of an innovative new product (example the Tesla auto in 2002). (See grading
rubrics)
3. Product and Service Process Matrixes
Research the Product and Service Matrixes on pages 144 and 150, then research and develop a
table that compares and contrasts the matrixes (at least 2 sources required). How are
these matrixes similar and also different? (See grading rubrics)
Note: Students only need to submit 1 MS Word document that combines all assignments.
15
18
25