Accounting Lego Project (With Example Project Attached) Concept Idea: A Box OR Whatever [PowerPoint with Charts/Graphs/FlowChart, Excel Calculations, Written Deliverable]

profileTutorialHelp2020
LegoProjectEXAMPLE1.docx

Lego Kit: “Home Field Advantage”

· Selling Price Breakdown:

Selling Price: $8.35

Price to Build: ($5.22)

Profit Margin: $3.13

· The selling price of “Home Field Advantage” is based on a profit margin of 60% which will contribute to the selling and other administrative expenses of the company. The price to build the Lego Kit is found by adding direct materials, direct labor, and applied overhead together. This Lego kit is relatively cheap to make due to no specialty pieces, allowing for a higher profit margin even while keeping the price low. It is a simple kit, however every little kid that watches college football will want to build their own stadium.

· Production Process:

Send completed bricks to packaging dept.

Bricks are

completed and sent to painting

Using the different colors, paint bricks

Put brick material into production

Send completed “Home Field Advantage” kit to be sold

Package bricks into helmet shaped boxes & check for defects

· Production Cost:

Direct Materials

Direct Labor

Overhead Costs

- Cost of Material for Brick

-Labor cost for production of Brick

-Depreciation on painting and manufacturing equipment

-Cost of Packaging (Helmet shaped box)

-Labor cost to paint brick specific color

-Factory utility expenses

-Cost of Paint for Brick

-Labor cost for packaging and checking for defects

-Indirect Materials needed to paint bricks

-Indirect Materials needed to package Lego kit

· Direct Material Breakdown:

Bricks Listed by Size & Color

Quantity Used

Cost/Unit

Total Cost

GREEN-12x24

3

.04

.12

GREEN 1x12

6

.04

.24

WHITE 1x12

22

.04

.88

YELLOW 1x2x5

4

.04

.16

YELLOW 1x12

12

.04

.48

YELLOW 1x8

2

.04

.08

ORANGE 2X2

14

.04

.56

BLUE 2X2

15

.04

.60

TOTAL

78

$3.12

· Total Cost of Goods Manufactured and Selling Price Breakdown:

TOTAL MATERIAL COST

Broken down above

$3.12

TOTAL LABOR COST

50% of total DM cost

$1.56

OVERHEAD COST

35% of total DL cost

$0.54

Total Cost

$5.22

Plus Mark Up of 60%

$3.13

Total Selling Price

$8.35

· In Progress Product:

· Final Product: