essay 2-3 pages Cost & Estimating
9/4/2020
1
CSMT 441
Site Works-Excavation
Lecture 6
1
2
Division 2 – Existing Conditions
• Surveys
• Geotechnical Investigation
• Site Demolition
• Transportation and Disposal of Hazardous Materials
• Asbestos Remediation
• Lead Remediation
• Mold Remediation
9/4/2020
2
3
4
9/4/2020
3
BCN 5618 5
6
Division 31 - Earthwork
• Site Clearing
• Earth Stripping & Stockpiling
• Excavation and Fill
• Erosion and Sedimentation Control
• Dewatering
• Excavation Support/Protection
9/4/2020
4
7
Earthwork
• Specifications
– Excess excavated materials (how far must it be
hauled)
– Clearing and grubbing (who is responsible?)
– Topsoil (must it be stockpiled for future use?
Where?)
– Trenching for mechanical and electrical work
(who is responsible for?)
8
Type of Soil
• Soil Borings
• Visiting the site
9/4/2020
5
9
Calculating Excavation
• Unit (cubic yard, 1 cy = 27 cf)
• Swell and shrinkage
– 1.0 cy in natural condition (bank yard) = 1.25
cy after digging (loose yards) = 0.9 cy after
compaction (compacted yards)
– swell factor = loose yard/bank yard
– shrinkage factor = compacted yard/bank yard
10
9/4/2020
6
11
Equipment
• Minimize hand digging and shoveling
• Select suitable equipment
– The bulldozer is suitable for moving soil for short distances only up to about 150 ft.
– Rubber-tired scrapers are excellent for earthmoving up to 1.5 miles.
– Dump trucks are used for hauls beyond the economic range of rubber-tired scrapers.
12
Equipment Selection
• The sheeps foot roller is suitable for compacting very
cohesive soil in lifts of about 6 in or less.
• Vibration is an excellent means of compacting sands,
and vibratory rollers are designed to use this method.
It is normally a steel wheel roller with an auxiliary
device to provide vibration to the roller.
• Pneumatic tired rollers, impart a kneading action as
well as vertical pressure on the soil being compacted.
They are good for sands, gravels, or those materials
in combination with some cohesive material.
9/4/2020
7
13
14
New site grades and rough grading
• Cutting and filling to reshape the grade
– Cross Section Method
• For building sites and parking areas
• Dividing the site into a grid and determining the cut
or fill for each of the grids
– Average End Area
• For long narrow tracts such as roads
• The site is divided into stations
9/4/2020
8
15
16
Labeling Convention
9/4/2020
9
BCN 5618 17
18
Fill Volume (Grid 13)
9/4/2020
10
19
Cut Volume (Grid 40)
20
Cut and Fill (Grid 10)
9/4/2020
11
21
22
New site grades and rough grading
• Cutting and filling to reshape the grade
– Average End Area
• For long narrow tracts such as roads.
• The site is divided into stations;
• a profile at each station line is drawn;
• the cut or fill area of two adjacent profiles is
averaged and multiplied by the distance between the
two stations.
9/4/2020
12
23
Road Site Plan
24
9/4/2020
13
25
Topsoil Removal
• Unit (cubic yard)
• Depth
• Stockpile location
• Clearance
– buildings: 5'
– walks, roadways, and parking areas: 1' to 2'
• Equipment: a bulldozer or a front-end loader
26
9/4/2020
14
27
General Excavation
• Removal of all types of soil that can be handled in
fairly large quantities using power equipment
(basement, cut for a highway, ..)
• Add 1' on all sides of the footing to allow workers
to install and remove forms
• Allow for the sloping of the banks (angle of
repose)
• What must be done with the excess excavation?
28
9/4/2020
15
29
Typical Excavation
BCN 5618 30
9/4/2020
16
31
Special Excavation
• Portions of the work that require hand
excavation or special equipment other than
general excavation (footing holes, small
trenches)
32
Backfilling
• Volume of excavation minus volume of the
building within the area of excavation.
• Tamping or compaction is required
• Soil shrinkage must be considered
9/4/2020
17
33
Backfill Section
34
Excess and Borrow
• If volume of cut > volume of fill, excess materials must be
disposed off
• If volume of fill > volume of cut, shortage materials must
be borrowed
• Topsoil is not included in this comparison.
• Consider soil swell for excess materials
• Determine the distance excess materials must be hauled
away
• Consider shrinkage for borrowed materials
9/4/2020
18
Support of Excavation Systems
35
BCN 5618 36
9/4/2020
19
37
Division 32 – Exterior Improvements
• Base Course
• Flexible Paving
• Rigid Paving
• Landscaping
38
Spreading Topsoil, Finish Grade
• Stockpiled topsoil is usually placed over
the rough grade to make it a finish grade. If
the volume is not sufficient, it will have to
be purchased.
9/4/2020
20
39
Asphalt Paving
• Unit (SY or Ton)
• Determine the surface area to be paved (SF)
• Determine the compacted thickness of each
course and type of materials required (inches)
• Use the following table to find the tonnage of
asphalt, granular materials, and subgrade
materials.
40
9/4/2020
21
41
Approximate Asphalt and
Granular Material Tonnage
BCN 5618 42
9/4/2020
22
43
Landscaping
• Seeding and fertilizing (type, no. of # per
square, area to be covered)
• Sodding (type, area to be filled)
• Trees and shrubs (number, size, and
species)
• Maintenance of landscaping and guarantee
period