Classifying Estimates

• Estimates can also be classified as

– Square foot or cubic foot estimates

• Used when only proposed size of project is known

• Accuracy is usually -20% to 30%

– Assembly estimates

• Used as a budgetary control tool in planning stage

• Accuracy is usually -10% to 20%

– Unit price estimates

• Working plans and full specifications are required

for completing unit price estimate

• Most accurate one and time consuming

• Accuracy is usually -5% to 10% 2

9/2/2020

2

Organizing the Estimate • Organized using Uniformat II and CSI

Masterformat approaches

• Uniformat II

– Which is used for assemblies(or systems)

estimates

– It is organized in divisions

• A-Substructures

• B- Shell

• C-Interiors

• D-Services

• E- Equipment

• F-Special Construction

• G-Building Sitework 3

Organizing the Estimate • Uniformat II

– Each division is further broken down into

individual assembles.

– Each individual assembly incorporates several

different items into a system that is commonly

used in buildings.

– In the assembly format, a construction

component may appear within more than one

division, eg., concrete is found in substructure

as well as shell

4

9/2/2020

3

Organizing the Estimate

• CSI Master format

– Commonly used in unit price estimate (most

accurate estimate).

5

The Construction Specification Institute (CSI)

– The Specifications provide;

• The description of the required materials and

equipment and their fabrication, quality,

workmanship, and/or installation details

– Estimates are organized using the CSI

• Developed standard format for organizing the

specifications known as the MasterFormat

• CSI were 15 (before 2004), now 50

• They are organized in divisions

• The CSI format ties with computer programs and

cost accounting systems

• It is not advisable to memorize the major divisions

as their constant usages will ensure mastery 6

9/2/2020

4

The Construction Specification Institute cont..

– Major divisions are

• Division 01 - General Requirements

• Division 02 - Existing Conditions

• Division 03 - Concrete

• Division 04 - Masonry

7

Organizing the Estimate

8

9/2/2020

5

Organizing the Estimate

9

3. Concrete

• 03 00 00: Concrete

• 03 10 00: Forming and Accessories

• 03 30 00: Cast-in-Place Concrete

• 03 40 00: Precast Concrete

• 03 50 00: Cast Decks and Underlay

• 03 60 00: Grouting

• 03 70 00: Mass Concrete

• 03 80 00: Cutting and Boring

10

9/2/2020

6

11

12

9/2/2020

7

13

14

9/2/2020

8

Contract Drawings

• Civil

• Landscaping

• Architectural

• Structural

• Mechanical, Electrical & Plumbing (MEP)

• Fire Protection

15

Contract Drawings

16

These six drawing types are the most common types, although some

buildings require other types as well.

9/2/2020

9

Contract Drawings

17

Civil drawings

can cover a very

large area,

depending on

the project.

Contract Drawings

18

Architectural

Drawings-

Roof

drawing

9/2/2020

10

Contract Drawings

19

Architectural

Drawings-

Elevations

Contract Drawings

20

Architectural

Drawings-

Detail

drawing

9/2/2020

11

Contract Drawings

21

Structural

Drawings-A

foundation

plan shows

the footings

for this

building.

Contract Drawings

22

Structural

Drawings-

Detail

drawings may

be needed in

all six

drawing types

to show

precisely how

components

should fit

together.

9/2/2020

12

Contract Drawings

23

Mechanical Drawings

Contract Drawings

24

Plumbing Drawings

The plumbing plan focuses on potable water distribution, sanitary and

sewage disposal, and fixtures

such as sinks and toilets.

9/2/2020

13

Contract Drawings

25

Electrical Drawings

Power plans show how power is distributed…

Contract Drawings

26

Electrical Plans

9/2/2020

14

Categories of Items

• Counted items

• Linear components

• Sheet and roll goods

• Volumetric goods

27

Categories of Items cont..

• Counted items

– Wood and metal studs

– Joists and trusses

– Steel beams and columns

– Doors and windows

– Plumbing and electrical fixtures

– cabinets

28

9/2/2020

15

Categories of Items cont..

• Linear components

– Footing forms

– Continuous rebar

– Handrails

– Fascia board

– Sills and plates

29

Categories of Items cont..

• Sheet and roll goods

– Wood sheeting

– Roofing

– Drywall

– Blocks and bricks

– Siding

– Steel decking

– Damp proofing

30

9/2/2020

16

Categories of Items cont..

• Volumetric goods

– Concrete

– Excavation

– Asphalt

31

Wastes and Overlaps

• Allow for a percentage (usually 5-10%) for

overlaps and wastages

– Sheeting overlaps

– Concrete placing wastages

32