Essay 1-2 pages Cost & estimating

profileSsult89
Lecture15-MEP.pdf

4/14/2021

1

MEP

Lecture 15

HVAC (Mechanical System)

 Usually subcontracted out

4/14/2021

2

Includes

 Heating equipment

 Cooling equipment

 Thermostats

 Ductwork

 Diffusers

 Registers

 Humidifiers

 Dehumidifiers

 Fans

 Insulation

 Return air

 Fresh air

 Louvers

 Associated piping

 Associated wiring

Coordination Requirements

 Underground utilities

 Location, size, excavation by whom, from where?

 Equipment

 Method of support, location, by whom, anchors, access for receiving and installing, size limitations, flues, roof curbs.

4/14/2021

3

Coordination Requirements

 Piping

 Wall sleeves, size limitations, chases, in walls, under floors, floor sleeves, expansion compensators, access doors.

 Ductwork

 Sizes, support, access doors, drops, outlet sizes, chases, outside air louvers, roof curbs, lintels.

Coordination Requirements

 Mechanical-electrical responsibility

 Who is doing what?

4/14/2021

4

Coordination Requirements

 Finishes

 Field or factory?

 Scheduling

 Work to be done? When required? Job to be completed on time-who, why, when?

Assembly

 Components grouped into assemblies

 May be used in

 Residential

 Light commercial

4/14/2021

5

Detailed Estimate

 Account for all the parts and pieces

 May use allowances for some small items

Electrical

 Often governed by the National Electrical Code

 Usually subcontracted out

4/14/2021

6

Includes

 Wiring

 Conduit

 Transformers

 Switches

 Panel boards

 Breakers

 Outlets

 Control panels

 Temporary wiring

 Etc.

Coordination Requirements

 Underground utilities

 Location, size, excavation by whom, from where?

 Equipment

 Recessed depth, size of access openings, method of feed, supports, by whom, size limitations.

4/14/2021

7

Coordination Requirements

 Distribution

 Outlet locations, materials, method of feed, chases, in walls, under floor, overhead, special considerations.

 Terminal fixtures and devices

 Location, method of support, finish, color, and material.

Coordination Requirements

 Scheduling

 Work to be done? When required? Job to be completed on time-who, why, when?

4/14/2021

8

Assembly

 Components grouped into assemblies

 May be used in

 Residential

 Light commercial

 Single-pole switch assembly

 Single-gang box

 Single-pole switch

 Cover plate

Detailed Estimate

 Account for all the parts and pieces

 May use allowances for some small items such as wire nuts

4/14/2021

9

Conduit and Wiring

 All three dimensions

 Two from plans

 Must include up and down

 Location must align with openings in the structural member

 Parallel to the buildings walls?

 Additional wiring is also needed at each end to connect the wiring to equipment

 Panels

Conduit

4/14/2021

10

Plumbing

 Often governed by the International Plumbing Code

 Usually subcontracted out

Includes

 Lavatories

 Water closets (toilets)

 Showers

 Bathtubs

 Sinks

 Water heaters

 Dishwashers

 Garbage disposals

 Water coolers

 Piping

 Water

 Gas

 Drain-waste-vent

 Grease traps

 Trenching

4/14/2021

11

Coordination Requirements

 Underground utilities

 Location, size, excavation by whom, from where?

 Mechanical room equipment

 Supports required, location, anchors, by whom?

 Distribution

 Wall system, hangers, chases, in wall, roof, vents, access doors.

Coordination Requirements  Fixtures

 Method of support, feed, outlets, built-in, floor drains, vents.

 Finishes

 Factory or field.

 Specialty equipment

 Field provisions, storage.

 Scheduling

 Work to be done? When required? Job to be completed on time-who, why, when?

4/14/2021

12

Assembly

 Components grouped into assemblies

 May be used in

 Residential

 Light commercial

Assembly

 Toilet assembly

 30 feet of 1/2-inch supply pipe with fittings

 1/2-inch by 3/8-inch shutoff valve

 3/8-inch by 12-inch braided supply line

 Toilet seat

 Wax gasket

 30 feet of 3-inch waste line with fittings

 $150 fixture allowance

4/14/2021

13

Detailed Estimate

 Account for all the parts and pieces

 May use allowances for some small items such as small fittings

Piping

 All three dimensions

 Two from plans

 Must include up and down

 Location must align with openings in the structural member

4/14/2021

14

Fire Sprinklers

 Bid same as plumbing