limited finance test 2.5 hour
3QA3/2DA3
Management Science for Business
Lecture 03
C01: June 28, 2021
C02: June 29, 2021
Instructors:
Seyyed Hossein Alavi Zdravko Dimitrov
Practice Question P2-13?
2
Let us look at Handout 1.1
LP Models in the Business World
Develop a written LP model on paper before
attempting to implement it on Excel!
We deal with problems:
with more than 2 variables
require more complicated modelling techniques
✓ Understand the logic behind a model before implementing it on the
computer!
✓ If the model is incorrect or incomplete from a logical perspective
(even if it is correct from a mathematical perspective), Excel cannot
recognize the logical error!
4
1- Blending Problem
Determining the optimal (least costly) mix of ingredients
Oil Companies Mix of different crude oils and other chemicals for gasoline
Lawn Care Companies Mix of chemicals and other products to make fertilizers
Agriculture Industry (Feed mix problem) Mix of grain, corn, and minerals to make different feeds for various farm
animals
Diet Problem Select a set of foods that will satisfy a set of daily nutritional requirement
5
1- Blending Problem
Handout 1.2.
An agriculture company received an order for 8,000 pounds of feed
At least 20% corn, 15% grain, 15% minerals
What should the company do to minimize the cost?
6
Nutrient Percent of Nutrition in
Feed 1 Feed 2 Feed 3 Feed 4
Corn 30% 5% 20% 10%
Grain 10% 30% 15% 10%
Minerals 20% 20% 20% 30%
Cost/pound $0.25 $0.30 $0.32 $0.15
1- Blending Problem
Decision Variables
𝑥1 = amount of feed 1 in pounds to use in the blend
𝑥2 = amount of feed 2 in pounds to use in the blend
𝑥3 = amount of feed 3 in pounds to use in the blend
𝑥4 = amount of feed 4 in pounds to use in the blend
Objective Function
Minimize 0.25𝑥1 + 0.30𝑥2 + 0.32 𝑥3 + 0.15𝑥4
7
1- Blending Problem
Constraints
Pounds of feed required
𝑥1 + 𝑥2 + 𝑥3 + 𝑥4 = 8,000
Min % of corn required
0.30𝑥1 + 0.05𝑥2 + 0.20𝑥3 + 0.10𝑥4 ≥ 0.20(8,000)
Min % of grain required
0.10𝑥1 + 0.30𝑥2 + 0.15𝑥3 + 0.10𝑥4 ≥ 0.15(8,000)
Min % of minerals required
0.20𝑥1 + 0.20𝑥2 + 0.20𝑥3 + 0.30𝑥4 ≥ 0.15(8,000)
Non-negativity constraints
𝑥1, 𝑥2, 𝑥3, 𝑥4 ≥ 0 8
2- Investment/Portfolio Problem
Finance Problems
Maximizing the expected return of an investment
Selecting from a variety of alternatives (companies)
Satisfying certain cash flow requirements
Satisfying certain risk constraints
Satisfying certain policy requirements
9
2- Investment/Portfolio Problem
Investing $750,000 in below companies
No more than 25% of money in any company
At least half of the money be invested in long-term bonds that mature in 10 or more years
No more than 35% in low rating companies (3 and 4)
10
Company Rate of return Years to Maturity Rating
1 8.65% 11 1-Excellent
2 9.50% 10 3-Good
3 10.00% 6 4-Fair
4 8.75% 10 1-Excellent
5 9.25% 7 3-Good
6 9.00% 13 2-Very Good
2- Investment/Portfolio Problem
Decision Variables
𝑥1 = amount of money to invest in Company 1
𝑥2 = amount of money to invest in Company 2
𝑥3 = amount of money to invest in Company 3
𝑥4 = amount of money to invest in Company 4
𝑥5 = amount of money to invest in Company 5
𝑥6 = amount of money to invest in Company 6
Objective Function
Maximize .0865𝑥1 + .095𝑥2 + .10𝑥3 + .0875𝑥4 + .0925𝑥5 + .09𝑥6
11
2- Investment/Portfolio Problem
Constraints
Total investment
𝑥1 + 𝑥2 + 𝑥3 + 𝑥4 + 𝑥5 + 𝑥6 = 750,000
Max amount in one bond
𝑥1, 𝑥2, 𝑥3, 𝑥4 , 𝑥5, 𝑥6 ≤ 0.25 750,000
Min amount invested in long-term bond
𝑥1 + 𝑥2 + 𝑥4 + 𝑥6 ≥ 0.5 750,000
Max amount invested in low rating bond
𝑥2 + 𝑥3 + 𝑥5 ≤ 0.35 750,000
Non-negativity constraints
𝑥1,𝑥2, 𝑥3,𝑥4 ,𝑥5,𝑥6 ≥ 0 12
3- Transportation Problem
Distribution of goods from several supply points to a number of
demand points
Each supply point has a capacity for production.
Each demand point has a certain demand.
Minimizing the distance/cost
Can also be defined as maximization of profit
13
3- Transportation Problem
14
Sources Destinations
Supply A B C
D $5 $4 $3 200
E $6 $7 $5 300
F $3 $8 $5 400
Demand 350 150 400 900=900
3- Transportation Problem
Sources Destinations
15
D
E
F
A
C
B
200 350
150
400
300
400
3- Transportation Problem
Decision Variables
𝑥𝑖𝑗 = number of goods shipped from source 𝑖 to destination 𝑗
where 𝑖 = D, E or F, and 𝑗 = A, B or C
Objective Function
Minimize 5𝑥DA + 4𝑥DB + 3𝑥DC
+ 6𝑥EA + 7𝑥EB + 5𝑥EC
+ 3𝑥𝐹𝐴 + 8𝑥FB + 5𝑥FC 16
3- Transportation Problem
Constraints (Flow in = Flow out)
Net flow at supply node D
200 = 𝑥DA + 𝑥DB +𝑥DC
Net flow at supply node E
300 = 𝑥EA + 𝑥EB +𝑥EC
Net flow at supply node F
400 = 𝑥FA + 𝑥FB +𝑥FC
Net flow at demand node A
𝑥DA + 𝑥EA +𝑥FA = 350
Net flow at demand node B
𝑥DB + 𝑥EB +𝑥FB = 150
Net flow at demand node C 𝑥DC + 𝑥EC +𝑥FC = 400
Non-negativity constraints
𝑥𝑖𝑗 ≥ 017
3- Transportation Problem
Supply > Demand
Supply equality must change to inequality
𝑆𝑢𝑝𝑝𝑙𝑦 𝑎𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒(𝐹𝑙𝑜𝑤 𝑖𝑛) ≥ 𝐹𝑙𝑜𝑤 𝑜𝑢𝑡
e.g. 300 ≥ 𝑥DA + 𝑥DB +𝑥DC
18
Sources Destinations
Supply A B C
D $5 $4 $3 300
E $6 $7 $5 300
F $3 $8 $5 400
Demand 350 150 400 900/1000
3- Transportation Problem
Supply < Demand
Demand equality must change to inequality
𝐹𝑙𝑜𝑤 𝑖𝑛 ≤ 𝐷𝑒𝑚𝑎𝑛𝑑 𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑(𝐹𝑙𝑜𝑤 𝑜𝑢𝑡)
e.g. 𝑥DA + 𝑥EA +𝑥FA ≤ 350
19
Sources Destinations
Supply A B C
D $5 $4 $3 200
E $6 $7 $5 300
F $3 $8 $5 400
Demand 350 150 500 1000/900
4- Crew/Labor Scheduling
Determining the optimal number of staff for a specific planning
horizon (month, week, shift, flight, …)
Staffing needs could be different during different time periods of
the planning horizon
20
4- Crew/Labor Scheduling A bank requires between 10 and 18 tellers
Can be full-time (at most 12) and part-time
Part-time salary: $28/day full-time: $90/day
Part-time work is 4 hours, can start from 9 am to1:00 pm
Full-time tellers work from 9 am to 5 pm with 1 hour for lunch
50% have lunch at 11:00 am, others at noon
Part-time hours cannot exceed 50% of the total required
21
Time Period # Required
9 a.m.–10 a.m. 10
10 a.m.–11 a.m. 12
11 a.m.–Noon 14
Noon–1 p.m. 16
1 p.m.–2 p.m. 18
2 p.m.–3 p.m. 17
3 p.m.–4 p.m. 15
4 p.m.–5 p.m. 10
4- Crew/Labor Scheduling
Decision Variables
𝐹 = number of full−time tellers to use (starting from 9 am to 5 pm)
𝑃1 = number of part-time tellers starting from 9 am to 1 pm
𝑃2 = number of part-time tellers starting from 10 am to 2 pm
𝑃3 = number of part-time tellers starting from 11 am to 3 pm
𝑃4 = number of part-time tellers starting from 12 pm to 4 pm
𝑃5 = number of part-time tellers starting from 1 pm to 5 pm
Objective Function
Minimize 90𝐹 + 28(𝑃1 + 𝑃2 + 𝑃3 + 𝑃4 + 𝑃5) 22
4- Crew/Labor Scheduling
Constraints
𝐹+𝑃1 ≥ 10 (9 am-10 am requirement)
𝐹+𝑃1+𝑃2 ≥ 12 (10 am-11am requirement)
0.5𝐹+𝑃1+𝑃2+𝑃3 ≥ 14 (11 am-12 pm requirement)
0.5𝐹+𝑃1+𝑃2+𝑃3+𝑃4 ≥ 16 (12 pm-1 pm requirement)
𝐹+𝑃2+𝑃3+𝑃4+𝑃5 ≥ 18 (1 pm-2 pm requirement)
𝐹+𝑃3+𝑃4+𝑃5 ≥ 17 (2 pm-3 pm requirement)
𝐹+𝑃4+𝑃5 ≥ 15 (3 pm-4 pm requirement)
𝐹+𝑃5 ≥ 10 (4 pm-5 pm requirement)
𝐹 ≤ 12 (Max # of full-timers)
4(𝑃1+𝑃2+𝑃3+𝑃4+𝑃5) ≤ 0.5(10+12+14+16+18+17+15+10) = 56 (Max hours of part-timers)
𝐹,𝑃1,𝑃2,𝑃3,𝑃4,𝑃5 ≥ 0 (Non-negativity constraints) 23
5- Multi-period Applications
Determine the optimal decisions for several periods
It is challenging because the decisions are not independent!
The decision of period 𝑡 depends on the decision of periods 𝑡 − 1, 𝑡 − 2, …
Applications in:
Production
Finance
etc.
24
5- Multi-period Production Planning
A company is trying to plan its production, with the objective of minimizing the total production and total inventory carrying cost.
Inventory Capacity: 6,000 (Current inventory: 2,000)
Safety stock: 1,500
Produce no less than half of max capacity
Cost of carrying inventory: 1.5% of unit cost
Inventory carrying cost is accounted based on the ending inventory each month (after demand is met)
What is the optimal quantity to produce for each month?
25
Month
1 2 3
Unit cost $240 $250 $265
Demand 1,000 4,500 4,000
Max Prod.
Capacity 4,000 3,500 4,000
5- Multi-period Production Planning
Decision Variables
• 𝑃1 = number of units to produce in month 1
• 𝑃2 = number of untis to produce in month 2
• 𝑃3 = number of units to produce in month 3
• 𝐼1 = ending inventory in month 1
• 𝐼2 = ending inventory in month 2
• 𝐼3 = ending inventory in month 3
Objective Function
Minimize 240𝑃1 + 250𝑃2 + 265𝑃3 +3.6𝐼1 + 3.75𝐼2 + 3.98𝐼3
26
5- Multi-period Production Planning
Constraints
Production constraints:
2,000 ≤ 𝑃1≤ 4,000 (production level for month 1)
1,750 ≤ 𝑃2≤ 3,500 (production level for month 2)
2,000 ≤ 𝑃3≤ 4,000 (production level for month 3)
27
5- Multi-period Production Planning
Constraints
Balance Constraints:
Ending Inventory = Beginning Inventory + Units Produced − Demand
𝐼1 = 𝐼0 + 𝑃1 − 1,000 (balance constraint for month 1)
𝐼2 = 𝐼1 + 𝑃2 − 4,500 (balance constraint for month 2)
𝐼3 = 𝐼2 + 𝑃3 − 4,000 (balance constraint for month 3)
Warehouse Capacity & Safety Stock
1,500 ≤ 𝐼1≤ 6,000 (ending inventory for month 1)
1,500 ≤ 𝐼2≤ 6,000 (ending inventory for month 2)
1,500 ≤ 𝐼3 ≤ 6,000 (ending inventory for month 3)28
6- Vehicle Loading Problem
Deciding on items to load on a vehicle
Maximizing the value of the load shipped
Constraints
Weight and volume limit of vehicle
Minimum level of certain items
29
6- Vehicle Loading problem
The company has 2 vehicles with
Weight capacity 10,000 pounds
Volume capacity 900 cubic feet
The weight of both vehicles must be equal.
The objective is to maximize the value of loaded items.
30
ITEM VALUE WEIGHT
(pounds) Value per pound
VOLUME
(cu. ft. per pound)
1 $15,500 5,000 3.10 0.125
2 $14,400 4,500 3.20 0.064
3 $10,350 3,000 3.45 0.144
4 $14,525 3,500 4.15 0.448
5 $13,000 4,000 3.25 0.048
6 $9,625 3,500 2.75 0.018
Practice Problems
CHAPTER 3
Problems 3, 7, 9, 12, 13, 17, 21
CHAPTER 5
Problem 17
31