I BIM-1
KB7038 Semester 2 INTERGRATED BIM MODELLING PROJECT
SEMINAR TWO: 18.2.21
Ray Elysee Email [email protected]
BLACKBOARD COLLABORATE LINK : https://eu.bbcollab.com/guest/f75d9e03bf94487e8f87485e fa5e7c0f
SEMINAR
AGENDA SEMINAR
10 – 12noon
Page no
Module Outcomes
2
PART 1: Project Brief
4
PART 2: Smiths Docks
16
PART 3: MMC
21
10 Minute Break 11am
PART 4 Tasks 1‐3
33
Demonstration
2 LEARNING OUTCOMES
2.1 Module Learning Outcomes (MLOs) Assessed by Coursework
1. Analyse the role of Building Information Modelling within the production management process.
2. Formulate solutions to design and production problems through a simulated project life cycle.
3. Justify and defend design or managerial choices made within the production process of a simulated project.
4. Apply disciplinary knowledge and multi-disciplinary skill to overcome complex problems of practice and identify appropriate solutions.
5. Reflect upon learning achieved within integrated collaborative environments.
2.1 GROUP DELIVERY SMITHS DOCKS PROJECT BRIEF :
STEP 1: Students to be assigned into small groups ( as designated ). STEP 2: Select one of the two design briefs as listed below
• OPTION 1: Sustainable housing scheme with consideration for an ageing population
• OPTION 2 : Eco Class room and Social Teaching environment
STEP 3: Formulate ideas using range of appropriate Modern Methods of Construction and offsite methodologies . Complete Tasks 1-3 and Present a 10minute Group presentation
Ray Elysee
BLACKBOARD COLLABORATE LINK : https://eu.bbcollab.com/guest/f75d9e03bf94487e8f87485e fa5e7c0f
PART KB7038 Semester 2 INTERGRATED BIM MODELLING PROJECT
PROJECT BRIEF
Design Brief 1. Option 1 : Sustainable Housing for third age
• Your design solution can be either single or multi storey Using off site construction methodologies and DDA Compliant
• Consider use of sustainable processes to heat, cool and ventilate the spaces.
• Each module to be no wider than 4.6m x 3.0m high.
• Internal maximum floor area 70sqm open plan area to ground floor and bathroom/ kitchen facility with 2 bedrooms ( one compliant with
• Allow Transport to site on a 15 x 4m wide articulated vehicle and to be lifted by crane on to a site constructed framework and support structure.
• Externally allow provision for open air sitting area with provision for 1 .5 car parking spaces per dwelling
• Site formatted with access road with electric charger point and cycle stand
Axonometric Illustration Fab house render from ArchiCAD Ray Elysee
CITB OFFSITE Ready – MODULE 1.1 Deliverables
Design Brief 1. Option 2 : MODULAR CLASSROOM
• Create a Modular off site learning environment for 25 ‐ 30 people for all ages and physical abilities
• Your design solution can be either single or multi storey . Present your outcomes in either sketch or 3D model format
• Engage with the principles ‘Off Site’ Construction Volumetric Methodologies and processes :
• Consider use of sustainable processes to heat, cool and ventilate the spaces.
• Each module to be no wider than 4.6m x 3.0m high. Transport to site on wide articulated vehicle and to be lifted by crane on to a site constructed framework and support structure.
• Site formatted to provide Access road, Disable parking and service vehicle together with 5 cycle stands
• Methodologies to include Grey water , passive ventilation and low carbon materials
1.3‐01
Fig 2
Fig 1
KB7038 DESIGN BRIEF: MODULAR CLASSROOM Stage 7:
Commission & Handover
Stage 6:
Roof & External Finishes
Stage 5:
Module 5 and 6 installed
Stage 4:
Module 3 & 4 installed
Stage 3:
Module 1 & 2 installed
Stage 2:
Modules Delivered
Stage 1:
Ground Works
SMITH’S DOCK LOCATION
SMITH’S DOCK LOCATION
SMITH’S DOCK LOCATION
NORTH
FAB HOUSES URBAN SPLASH SITE LAYOUT NE29 6TH
SMITHS DOCKS FAB HOUSE : NE29 6TA
FAB HOUSE Copyright TDO Architects
SMITHS DOCK FAB HOUSE Department of Mechanical and Construction Engineering Faculty of Engineering and Environment
URBAN SPLASH ‘HOUSE’ Smiths Dock North Shields & Smoke Houses
FAB HOUSE Copyright TDO Architects
Site Area 3,200sqm