I BIM-1

profileBrucele
KB7038Seminar2Part1.pdf

KB7038 Semester 2 INTERGRATED BIM MODELLING PROJECT

SEMINAR TWO: 18.2.21

Ray Elysee  Email [email protected]

BLACKBOARD COLLABORATE LINK : https://eu.bbcollab.com/guest/f75d9e03bf94487e8f87485e fa5e7c0f

SEMINAR

AGENDA  SEMINAR

10 – 12noon

Page no

Module  Outcomes 

2

PART 1:  Project Brief

4

PART 2:   Smiths Docks

16

PART 3: MMC

21

10 Minute Break  11am

PART 4  Tasks 1‐3

33

Demonstration

2 LEARNING OUTCOMES

2.1 Module Learning Outcomes (MLOs) Assessed by Coursework

1. Analyse the role of Building Information Modelling within the production management process.

2. Formulate solutions to design and production problems through a simulated project life cycle.

3. Justify and defend design or managerial choices made within the production process of a simulated project.

4. Apply disciplinary knowledge and multi-disciplinary skill to overcome complex problems of practice and identify appropriate solutions.

5. Reflect upon learning achieved within integrated collaborative environments.

2.1 GROUP DELIVERY SMITHS DOCKS PROJECT BRIEF :

STEP 1: Students to be assigned into small groups ( as designated ). STEP 2: Select one of the two design briefs as listed below

• OPTION 1: Sustainable housing scheme with consideration for an ageing population 

• OPTION 2 : Eco  Class room and Social Teaching environment  

STEP 3: Formulate ideas using range of appropriate Modern Methods of Construction and offsite methodologies . Complete Tasks 1-3 and Present a 10minute Group presentation

Ray Elysee 

BLACKBOARD COLLABORATE LINK : https://eu.bbcollab.com/guest/f75d9e03bf94487e8f87485e fa5e7c0f

PART KB7038 Semester 2 INTERGRATED BIM MODELLING PROJECT

PROJECT BRIEF

Design Brief 1. Option 1 : Sustainable Housing  for third age  

• Your design solution  can be either single or multi storey  Using off site construction methodologies  and DDA  Compliant 

• Consider use of  sustainable processes to heat, cool and  ventilate the spaces.

• Each module to be no wider than 4.6m  x  3.0m high.

• Internal maximum floor area 70sqm  open plan area to  ground floor and bathroom/ kitchen facility with 2  bedrooms ( one compliant with   

• Allow Transport to site on a 15 x 4m wide articulated  vehicle and to be lifted by crane on to a site constructed  framework and support structure. 

• Externally allow provision for open air  sitting  area with  provision for 1 .5 car parking spaces per dwelling 

• Site formatted with access road with electric charger  point and cycle stand  

Axonometric  Illustration Fab house render  from ArchiCAD  Ray Elysee

CITB OFFSITE Ready – MODULE 1.1 Deliverables

Design Brief 1. Option 2 : MODULAR  CLASSROOM

• Create a  Modular off site  learning environment for 25 ‐ 30 people for all ages and physical abilities

• Your design solution  can be either single or multi storey  . Present your outcomes  in either  sketch or 3D model  format 

• Engage with the principles ‘Off Site’ Construction  Volumetric Methodologies and processes :

• Consider use of  sustainable processes to heat, cool and  ventilate the spaces.

• Each module to be no wider than 4.6m x 3.0m high.  Transport to site on  wide articulated vehicle and to be  lifted by crane on to a site constructed framework and  support structure. 

• Site formatted to provide Access road,  Disable parking  and service vehicle together with 5 cycle stands

• Methodologies to include Grey water , passive  ventilation and low carbon materials  

1.3‐01 

Fig 2

Fig 1

KB7038 DESIGN BRIEF: MODULAR CLASSROOM Stage 7:  

Commission & Handover 

Stage 6:  

Roof & External Finishes 

Stage 5: 

Module 5 and 6 installed

Stage 4:

Module 3 & 4  installed

Stage 3: 

Module 1 &  2 installed

Stage 2:

Modules Delivered 

Stage 1:

Ground Works

SMITH’S DOCK  LOCATION

SMITH’S DOCK LOCATION

SMITH’S DOCK LOCATION

NORTH

FAB HOUSES URBAN SPLASH SITE LAYOUT  NE29 6TH

SMITHS DOCKS FAB HOUSE : NE29 6TA

FAB HOUSE Copyright TDO Architects 

SMITHS DOCK FAB HOUSE Department of Mechanical and Construction Engineering Faculty of Engineering and Environment

URBAN SPLASH ‘HOUSE’ Smiths Dock North Shields & Smoke Houses

FAB HOUSE Copyright TDO Architects 

Site Area 3,200sqm