GWDT award. A barrage was proposed at Tummidihetti(V) to divert 160 TMC of water to irrigate 16.40 lakh Ac in 7 districts of Telangana State viz., Adilabad, Nizamabad, Kar Warangal, Nalgonda & Rangareddy, besides drinking water & industrial water.

The project contemplated to provide Irrigation facilities for an ayacut of 16,40,000 Acres in drought prone areas in 7 Districts in Telangana State. Further, it al TMC of Drinking Water to the villages enroute, 30 TMC of Drinking Water to twin Cities of Hyderabad & Secunderabad and 16 TMC of water for Industrial use.

The entire project works are divided into 7 links & 28 packages. Agreements concluded for all 28 Packages during 2007

But, due to the following aspects the project was taken up for re

Inter State Aspect:  Due to location of its head works, Dr.B.R.Ambedkar Pranahita

(PCSS) project is an Interstate project between Maharashtra and erstwhile Andhra Pradesh. The barrage was proposed with FRL +152.00 m and capacity +5.09 TMC.

 As per the Godavari Water Disputes Tribunal (GWDT) report, dated 06th October 1975, the State of Maharashtra and Andhra Pradesh have agreed to take up 3 projects namely (1) Lendi Project, (2) Lower Penganga and (3) Pranahita agreed water utilization. Accordingly, Dr.B.R.Ambedkar Pranahita Sravanthi project was taken up.

 Maharashtra Government expressed concerns over fixing of the proposed FRL of +152.00 for construction of barrage near Tummidi Hetti due to submergence of large extent of land in their territory and requested to reduce the FRL and avoid submerge territory.

 An agreement for constitution of Inter State Board for PCSS was entered into by the then Hon’ble C.Ms of Maharashtra & AP on 05/05/2012.

 The Government of Maharashtra have repeatedly requested to lower the FRL from +152.00 m to +148.00 m and minimize the extent of submergence.

 Detailed Joint surveys by both the States and the actual submergence extent of Maharashtra territory was assessed as 3786 acres with barrage at FRL +152.00 m and 285 acres with FRL of +148.00 m.

KALESHWARAM PROJECT

Preamble: Kaleshwaram Project has been

conceived from the erstwhile Dr. B.R. Ambedkar Pranahita- Chevella Sujala Sravanthi project.

Originally, Dr. B.R. Ambedkar Pranahita- Chevella Sujala Sravanthi was proposed to utilize 160 TMC of allocated water of Godavari basin as per

GWDT award. A barrage was proposed at Tummidihetti(V) to divert 160 TMC of water to irrigate 16.40 lakh Ac in 7 districts of Telangana State viz., Adilabad, Nizamabad, Karimnagar, Medak, Warangal, Nalgonda & Rangareddy, besides drinking water & industrial water.

The project contemplated to provide Irrigation facilities for an ayacut of 16,40,000 Acres in drought prone areas in 7 Districts in Telangana State. Further, it also planned to provide 10 TMC of Drinking Water to the villages enroute, 30 TMC of Drinking Water to twin Cities of Hyderabad & Secunderabad and 16 TMC of water for Industrial use.

The entire project works are divided into 7 links & 28 packages. Agreements concluded for all 28 Packages during 2007-08 & 2008-09.

But, due to the following aspects the project was taken up for re-engineering:

Due to location of its head works, Dr.B.R.Ambedkar Pranahita-Chevella Sujala Sravanthi roject is an Interstate project between Maharashtra and erstwhile Andhra

Pradesh. The barrage was proposed with FRL +152.00 m and capacity +5.09 TMC. As per the Godavari Water Disputes Tribunal (GWDT) report, dated 06th October 1975,

tra and Andhra Pradesh have agreed to take up 3 projects namely (1) Lendi Project, (2) Lower Penganga and (3) Pranahita-Chevella at appropriate time with agreed water utilization. Accordingly, Dr.B.R.Ambedkar Pranahita-Chevella Sujala

taken up. Maharashtra Government expressed concerns over fixing of the proposed FRL of +152.00 for construction of barrage near Tummidi Hetti due to submergence of large extent of land in their territory and requested to reduce the FRL and avoid submerge

An agreement for constitution of Inter State Board for PCSS was entered into by the then Hon’ble C.Ms of Maharashtra & AP on 05/05/2012. The Government of Maharashtra have repeatedly requested to lower the FRL from

.00 m and minimize the extent of submergence. Detailed Joint surveys by both the States and the actual submergence extent of Maharashtra territory was assessed as 3786 acres with barrage at FRL +152.00 m and 285 acres with FRL of +148.00 m.

Kaleshwaram Project has been conceived from the erstwhile Dr. B.R.

Chevella Sujala

Originally, Dr. B.R. Ambedkar Chevella Sujala Sravanthi project

was proposed to utilize 160 TMC of allocated water of Godavari basin as per

GWDT award. A barrage was proposed at Tummidihetti(V) to divert 160 TMC of water to irrigate imnagar, Medak,

The project contemplated to provide Irrigation facilities for an ayacut of 16,40,000 Acres so planned to provide 10

TMC of Drinking Water to the villages enroute, 30 TMC of Drinking Water to twin Cities of

The entire project works are divided into 7 links & 28 packages. Agreements are

engineering:

Chevella Sujala Sravanthi roject is an Interstate project between Maharashtra and erstwhile Andhra

Pradesh. The barrage was proposed with FRL +152.00 m and capacity +5.09 TMC. As per the Godavari Water Disputes Tribunal (GWDT) report, dated 06th October 1975,

tra and Andhra Pradesh have agreed to take up 3 projects namely Chevella at appropriate time with

Chevella Sujala

Maharashtra Government expressed concerns over fixing of the proposed FRL of +152.00 for construction of barrage near Tummidi Hetti due to submergence of large extent of land in their territory and requested to reduce the FRL and avoid submergence in their

An agreement for constitution of Inter State Board for PCSS was entered into by the then

The Government of Maharashtra have repeatedly requested to lower the FRL from

Detailed Joint surveys by both the States and the actual submergence extent of Maharashtra territory was assessed as 3786 acres with barrage at FRL +152.00 m and 285

 A meeting was held on 17th February 2015 between Hon’ble Chief Minister of Telangana and Hon’ble Chief Minister of Maharashtra along with Hon’ble Ministers and officers of Telangana and Maharashtra. In the meeting, the Hon’ble Chief Minister of Maharashtra expressed that considering the unrest, it is necessary to lower down the barrage level and minimize the submergence area.

 A co-ordinating committee meeting was held on 29-12-2015 to finalize the FRL of the barrage at +148.00m with a capacity of about 1.85 TMC which was agreed by Government of Maharashtra.

 The Government of Telangana exercised all-out efforts and after conducting as many as 12 meetings (Technical, Co-ordination committee, Hon’ble Minister’s level & Hon’ble Chief Minster’s level). An Interstate Board was constituted to resolve the issues between both the states on 08th March, 2016 and finally the Government of Maharashtra has agreed for construction of barrage at Tummidihetti across river Pranahita with FRL +148.00 m during Interstate Board meeting held in Mumbai on 23-08-2016.

Water availability

 The detailed water availability studies were carried out and assessed by the Central Water Commission, New Delhi. Accordingly, the net water availability at the barrage location (Tummidihetti) was assessed as about 165.38 TMC at 75% dependability which includes perceived surpluses of 63 TMC from the share of u/s states.

 Further, the CWC stated that availability of surpluses of 63 TMC from upstream states as estimated at the barrage site may not be reliably available in future.

 As per the Hydrology studies with FRL +152.00 m, the divertible water would be about 110 to 120 TMC against 160 TMC required & proposed.

 As per the studies done with FRL of +148.00 m, involving minimum submergence in Maharashtra, the divertible flows is 44 TMC only as against the allocation & utilization of 160 TMC.

 Thus, the water available is not sufficient to meet the planned utilization of this project.

Storage capacities

 Further, the Central Water Commission, suggested to re-look into the integrated Storage Planning aspects of the project to match the demand and supply as the proposed capacities of storage reservoirs is insufficient for success of the project and stated that there is requirement of artificial reservoirs within and around the project area either by increasing the capacity of existing reservoirs or creating additional new reservoirs.

Revised Scope of Project The basic concern of Maharashtra on submergence and the insufficient availability of water at Tummidihetti location has rendered the basic assumption of location of barrage Head works at Tummidihetti as technically unsuitable for meeting the requirements of the entire contemplated ayacut, necessitating a total re-look and study of suitable alternative location for drawing the required quantum of water with assured dependability.

Hence, in order to make the project functional and achieve the contemplated benefits to effectively utilize the Telangana state’s share of Godavari Basin, an alternate location of barrage across river Godavari had to be investigated by M/s WAPCOS Ltd., by using the latest technology

i.e., LiDAR technique and the location was proposed at Medigadda(V) (near Kaleshwaram), Mahadevpur (M), Karimnagar District. The location of the barrage is most suitable at Medigadda(V) near Kaleshwaram, Jayashankar hupalapally District where the net availability of water has been assessed as 284.3 TMC (as against the proposed diversion of 195 TMC) considering ongoing and proposed utilization through the projects in Penganga, Wardha, Pranahita, Middle Godavari and Manair sub basins. In view of the above, the original project has been divided into two components viz., Kaleshwaram and Dr.B.R.Ambedkar Pranahita Project (Adilabad) as follows: Dr.B.R.Ambedkar Pranahita project  To divert 20 TMC of water by constructing a barrage across river Pranahita near the

confluence of Wainganga and Wardha rivers at Tummidihetti (V), Koutala (M), Adilabad District for irrigating an ayacut of 2,00,000 acres in East Adilabad district against the original proposed 56,500 acres in the district.

Kaleshwaram Project  Construction of one barrage across river Godavari at Medigadda near Kaleshwaram, and

two more barrages between Medigadda and Sripada Yellampally Project at Annaram & Sundilla and to convey water from Sripada Yellampally Project to the command area spread over in 7 districts of Telangana (now 13 districts after re-organization of districts in the state) through components such as canals, tunnels, lift systems, reservoirs, and distributory network for irrigating an ayacut of 18,25,700 acres against the original proposed ayacut of 16,40,000 acres. Further, it is proposed to stabilize the existing ayacut in other major projects viz., SRSP Stage-I, SRSP Stage-II, Flood Flow Canal, Singur & Nizamsagar projects to an extent of 18,82,970 acres. Besides irrigation, drinking water (30 TMC for twin cities & 10 TMC for enroute villages) & water for industrial use (16 TMC) is also proposed.

 Further, after careful planning, the proposed capacity of reservoirs is increased from 11.43 TMC to 147.71 TMC by enhancing the capacities of existing reservoirs and proposing new reservoirs to match the demand and supply.

 It is re-iterated that the Kaleshwaram and Pranahita projects are the off-shoots of Dr.B.R.Ambedkar Pranahita-Chevella Sujala Sravanthi project, necessitated because of comments of CWC and inter-state issues with Maharashtra.

Source & Location: River Godavari, at Medigadda (V) near Kaleshwaram, Mahadevpur (M), Karimnagar (Dist.)

Components of Lift Scheme: Sl. No.

Description

i) Series of Barrages across the Godavari River

ii) Water conveyer system consisting of Gravity canals & Tunnels

iii) Lift System

iv) Reservoirs

v) Distributory Net work System

Salient features:

Sl No

Description Particulars

1 Gravity Canal 1531 km 2 Tunnel 203 km 3 Pressure Mains/ Delivery Mains 98 km 4 Total Length of the Water Conductor System 1832 km 5 No. of Lifts 20 6 No. of reservoirs 20 7 Total Capacity of reservoirs 147.71 TMC 8 Total Water being lifted from Godavari river 195 TMC 9 Water lifted from SYP 20 TMC 10 Ground Water 25 TMC 11 Total Water Availability 240 TMC 12 Water for Irrigation (New + Stabilization Ayacut) 169 TMC 13 Drinking Water supply (Twin cities & enroute villages ) 40 TMC 14 Water supply to Industries 16 TMC 15 Designed Power Rating 4627 MW 16 Districts Benefitted (New ayacut) 13 Districts 17 Total districts covered in New / Stabilization ayacut 20 Districts

List of reservoirs proposed under Kaleshwaram Project

Sl. No. Name of the Reservoir Capacity in TMC 1 Barrage at Medigadda with FRL 100.0 m 16.17 2 Barrage at Annaram with FRL 120.0 m 11.9 3 Barrage at Sundilla with FRL 130.0 m 5.11 4 Medaram Reservoir 0.78 5 Ananthagiri Reservoir 3.50 6 Sri Ranganayaka Sagar (Imamabad Reservoir) 3.00 7 Sri Komaravelly Mallana Sagar (Tadkapally) 50.00 8 Malkapet Reservoir 3.00 9 Konda Pochamma Reservoir (Pamulaparthy) 7.00

10 Amarlabanda Reservoir 5.00 11 Katchapur 2.50 12 Thimmakka Palli 3.00 13 Issaipet 2.50 14 Bhumpally Reservoir 0.09 15 Gujjal Reservoir 1.50 16 Katewadi Reservoir 5.00 17 Mothe Reservoir 2.90 18 Kondem Cheruvu 3.50 19 Gandhamalla Reservoir 9.87 20 Baswapuram Reservoir 11.39

TOTAL 147.71

Actual Cost of the project

 The actual cost of the project worked out to Rs.80190.46 Crores which is approved by the CWC and TAC.

Sl. No.

Name of Item Amount (Rs. in Crores)

1 Works 63352.00 2 Sub-Stations 2885.84 3 Land 6953.65 4 Resettlement & Rehabilitation 1464.34 5 Forest Land 741.52 6 Operation & Maintenance 661.08 7 Establishment charges @ 2% 1365.43 8 Tools & Plants and Recoveries 769.27 9 Miscellaneous 868.51 Total Direct Charges (1+2+3+4+5+6+7+8+9) 79061.64

10 Indirect charges (Capital value of land abatement) 359.55 11 (Audit & Account charges) 769.27

Total Indirect Charges (10+11) 1128.82 GRAND TOTAL 80190.46

Irrigation Potential (in Acres):-

The project is divided into seven links. Each link conveys the water from a source to a storage system and/or distributory network system to irrigate the ayacut. These links are summarized in the table below: Link No. Particulars Command Area

Hectares Acres Link-I From Medigadda Barrage on Godavari River to Sripada Yellampally

Project 12141 30000

Link-II From Sripada Yellampally Project to Mid Manair Reservoir (Package 6, 7 & 8)

- -

Link-III From Mid Manair Reservoir to Upper Manair Reservoir (Package 9) 34864 86150 Link-IV From Mid Manair Reservoir to Konda Pochamma Reservoir

(Package 10, 11, 12, 13 & 14) 238478 589280

Link-V From Anicut to Chityala (Package 15 & 16) 101902 251800 Link-VI From Sri Komaravelly Mallana Sagar to Singur Reservoir (Package

17, 18, 19) 133161 329042

Link-VII From SRSP Foreshore to Nizam Sagar Canals and upto Kondem cheruvu (Package 20, 21 & 22) and to Dilwapur (Package 27) and Hangarga (Package 28) village for Nirmal and Mudhole Constituency

218304 539428

TOTAL 7,38,851 18,25,700

Districts Wise New / Stabilization Ayacut: Ayacut in Acres

TOTAL AYACUT (NEW+ STABILIZATION) = 3708670 Acres

Sl. No

Name of the District New

Stabilization Under

Flood Flow Canal

SRSP Stage-I

SRSP Stage-II

Nizamsagar Singur

1 Kamareddy 184108

2 Sangareddy 269744 40000

3 Medak 247418

4 Medchal 29473

5 Yadadri 249105

6 Nalgonda 29169

7 Rajanna Sircilla 153539

200000

8 Siddipet 329616

9 Jangaon

10 Jagityal 19979

968640

11 Karimnagar 800

12 Peddapalli 30000

13 Warangal Urban

14 Nirmal 100000

15 Nizamabad 182749 234330

16 Prof.Jayashankar (Bhupalpalli)

17 Warangal Rural

440000

18 Mahabubabad

19 Khammam

20 Suryapet

TOTAL 1825700 200000 968640 440000 234330 40000

The project is divided into 25 packages Sl. No.

Description of work No of Packages.

1 Diverting water to Sripada Yellampally Project by constructing barrages at Medigadda, Annaram & Sundilla across river Godavari

6

2 Sripada Yellampally Barrage to Mid Manair Reservoir 3 3 Mid Manair Reservoir to Upper Manair Reservoir 1 4 Mid Manair Reservoir to Sri Komaravelli Mallanna Sagar 3 5 Sri Komaravelli Mallanna Sagar to feed Package-14 & 15 by Gravity canal, to feed

Package-17 through Parallel Canal and serve ayacut of 40000 acres 1

6 Package-13 OT-point to Sri Konda Pochamma Reservoir 1 7 End of Package-13 Gravity canal towards Chityala 2 8 End of Parallel canal of Package-13 to Singur Reservoir 3

9 Foreshore of Sri Ram Sagar Project to Kondem Cheruvu 2 10 From Kondem Cheruvu to irrigate an ayacut of Kamareddy & Yellareddy

Constituencies 1

11 Foreshore of Sri Ram Sagar Project to Dilwarpur and Hangarga 2

RESERVOIRS SUBMERGENCE DETAILS: ANANTHAGIRI Reservoir

Sl. No.

Description Particulars

1 Capacity (TMC) 3.50 2 Forest Submergence (Acres) 324.27 3 Land Acquisition(Acres) 2,469 4 F.R.L. +397.00 5 T.B.L. +400.70 6 Length of Bund (KM) 6.40 7 Max. Height of Bund (M) 38.00 8 Name of the Villages Submerged 1. Ananthagiri(V), Ellanthakunta (M) = 854

2. Allipur Hamlets: a) Yellaipally Chinnakodur(M) = 26 b) Kochaguttapally Chinnakodur(M) = 109

9 No. of Houses 989

IMAMABAD/Sri Ranganayaka sagar Reservoir:

Sl. No.

Description Particulars

1 Capacity (TMC) 3.00 2 Forest Submergence (Acres) ---- 3 Land Acquisition(Acres) 2,176 4 F.R.L. +490.00 5 T.B.L. +493.60 6 Length of Bund (KM) 8.65 7 Max. Height of Bund (M) 32.63 8 Name of the Villages Submerged 9 No. of Houses ----

Komaravelly Mallanna sagar Reservoir:

Sl. No.

Description Particulars

1 Capacity (TMC) 50.00 2 Forest Submergence (Acres) 3280.14 3 Land Acquisition(Acres) 13,962 4 F.R.L. +557.00 5 T.B.L. +562.20 6 Length of Bund (KM) 22.90/1.60 7 Max. Height of Bund (M) 61.50 8 Name of the Villages Submerged 1.Bramhana Banjerupally (V) Thogutta (M) = 182

2.Rampoor (V) Thogutta (M) = 232 3. Yetigadda Kisthapur (V) Thogutta (M) = 547 4. Vemulaghat Thogutta (M) = 638 5. Pallephad (V) Thogutta (M) = 582 6. Singaram (V) Thogutta (M) = 120 7. Yerravally (V) Kondapaka (M) = 348 8. Laxmapur (V) Thogutta (M) = 170 

9 No. of Houses 2819

Konda Pochamma Reservoir:

Sl. No.

Description Particulars

1 Capacity (TMC) 15.00 2 Forest Submergence (Acres) 135.04 3 Land Acquisition(Acres) 4,636 4 F.R.L. +618.00 5 T.B.L. +622.60 6 Length of Bund (KM) 15.80 7 Max. Height of Bund (M) 46.70 8 Name of the Villages Submerged 1. Mamidala (V) Mulugu(M) = 548

2. Thanedarpally (V) Mulugu(M) = 159 3. Bailampur(V) Mulugu(M) = 352

9 No. of Houses 

Gandamalla Reservoir :

Sl. No.

Description Particulars

1 Capacity (TMC) 9.87 2 Forest Submergence (Acres) 149.993 3 Land Acquisition(Acres) 4,027 4 F.R.L. +510.00 5 T.B.L. +514.20 6 Length of Bund (KM) 3.50 7 Max. Height of Bund (M) 51.022 8 Name of the Villages Submerged 1. Gandamalla, M.Turkapalle(M) = 814

2. Indiranagar H/o Gandamalla, M.Turkapalle(M) = 150 3. Thettukunta H/o Veerareddy Pally M.Turkapalle(M) = 95

9 No. of Houses 

Basawapoor Reservoir :

Sl. No.

Description Particulars

1 Capacity (TMC) 11.39 2 Forest Submergence (Acres) --- 3 Land Acquisition(Acres) 3,780 4 F.R.L. +490.00 5 T.B.L. +495.00 6 Length of Bund (KM) 14.55 7 Max. Height of Bund (M) 60.00 8 Name of the Villages

Submerged 1. Thimmapur (v), Bhongir (M) = 643 2. Laxminayakudi thanda H/o Rallajangaon (V), Yadagirigutta (M) = 75 3. Chongalnayakudi Thanda H/o Rustapur (V), Turkapally (M) = 60

9 No. of Houses 778

1. Salient Features of Link-1

Link 1 of the project consists of construction of three barrages at Medigadda, Annaram and Sundilla barrages with a storage of almost 33 TMC and it is planned to lift the water through these barrages to Sripada Yellampalli reservoir via three lift systems at Medigadda, Annaram and Sundilla by means of conveyor system consisting of approach channel, gravity canals and delivery mains (Pipelines). The link is critical for lifting water from Godavari and dropping into Sripada Yellampally Project, which can then be conveyed further to feed various reservoirs and serve the command area under different Packages in other links.

The total length of the link is 46.30 Km. an Approach channel of length 8.1 Km, Gravity Canal of 16.3 Km and delivery mains of total length 21.95 Km is provided.

2. Salient Features of Link-2 Link 2 carries water from Sripada Yellampalli reservoir to Mid-manair Reservoir, and

feeding Medaram tank along the way. From Mid-Manair reservoir, water can further be conveyed to the downstream links 3, 4, 5 & 6. This link has no direct ayacut. This link is characterized by tunnels, canals and pump houses consisting of pumps and motors with huge capacity.

Key Features of Link-I

Gravity Canal

21.17 km

3 Barrages

Medigadda, Annaram, Sundilla

Storage Capacity

33.18 TMC30,000 acres Ayacut

3 Pump House

Medigadda, Annaram, Sundilla

Medigadda Barrage Yellampally Reservoir

Key Features of Link-II

Canal

11.92 km

Twin Tunnel

24.907 km each

Medaram Reservoir

0.78 TMC

No Ayacut

Pump House

2

Sri Pada Yellampally Reservoir

Mid Manair Reservoir

This link comprises of 3 sub links with a gravity canal of 12.20 km length, a twin tunnel each of 10 m diameter and total length of 49.80 km (2 X 24.9 Km) and delivery mains of total length 3.64 Km. The total length of conveyor system of Link – II is about 65.63 Km.

3. Salient Features of Link-3 Link 3 is proposed to convey water from Mid Manair Reservoir to Upper Manair Reservoir,

feeding Malkapet Reservoir along the way. Link 3 is proposed to serve an ayacut of 86,150 Ac.

The link involves a gravity canal of 27.50 Km, tunnel of 12 Km length and pressure main of total length 5.92 Km. The total length of the conveyor system of Link III is about 45.48Km.

4. Salient Features of Link-4 Link-4 is proposed to convey water from Mid

manair Reservoir to Kondapochamma Sagar and feeding Ananthagiri, Sri Komaravelli Mallana Sagar, Sri Ranganayaka Sagar Reservoirs on the way. The total storage capacity along these packages is 71.5 TMC and total ayacut served through the Link is 5,89,280 acres.

The Link Canal System IV comprises 5 sub links with an open gravity channel of 394.0 Km, tunnel of 41.40 Km length and delivery mains of total length 10.82 Km. The total length of the conveyor system of Link IV is about 446.22 Km.

Key Features of Link-III

Canal

27.521 km

Tunnel

12.035 km

Malkapet Reservoir

3 TMC

Ayacut (acres)

86,150

Pump Houses

2

Mid Manair Reservoir

Upper Manair Reservoir

Key Features of Link-IV

Tunnel

32.421 km 4 Reservoirs Total Storage

Capacity

71.5 TMC

Ayacut (acres)

5,89,280

Pump Houses

4

Mid Manair Reservoir

Kondapochamma Sagar Reservoir

Gravity Canal

73.985 km

5. Salient Features of Link-5 Link-5 is proposed to carry water from Sri Komaravelli Mallana Sagar to Mulkalapalli Village

of Chityal Mandal and feeding Gandhamalla and Baswapur reservoirs having a total storage capacity of 21.26 TMC. The total ayacut under Link-5 is 2,51,800 Ac

The total length of the gravity link is 207 km and a tunnel of 1.45 km length. The total length of the conveyor system of Link V is about 208.65 Km.

6. Salient Features of Link-6 Link-6 is crucial as it creates an ayacut

of 3,29,042 Acres and carries water from Package 13 to Singur Reservoir. The total length of the gravity canal is 581 km, 0.93 Km length of delivery mains and a tunnel length of 43 km. The total length of the conveyor system of Link VI is about 625 Km.

Key Features of Link-V

Gravity Canal

122.15 km

Tunnel

1.275 km

Baswapur & Gandhamalla

Reservoir

21.26 TMC Ayacut (acres)

2,51,800

Package 13 Chityala

Key Features of Link-VI

Gravity Canal

128.43 km

Tunnel

22.218 km

Ayacut (acres)

3,29,042

Sri Komaravelly Mallana Sagar

Singur

7. Salient Features of Link-7 Link-7 is crucial as it creates an ayacut of 5,39,428 Ac and a storage capacity of 8.72 TMC. It

carries water from the fore shore of SRSP reservoir in three directions. One off-take is from Godavari River at Package 20, which conveys water to series of reservoir, canal and tunnel system in Package 20, 21 & 22 and irrigates ayacut under Nizamabad and Kamareddy districts. The second off-take for this link is from SRSP foreshore and it conveys water to irrigate ayacut in Nirmal district under Package 27. The third off-take for this link is from SRSP foreshore and creates ayacut in Nirmal district under Package-28.

The total length of the link includes a tunnel of 56 Km, gravity canal of 285 Km and pressure main of 55 Km length. The total length of the conveyor system of Link VII is about 395Km.

Project Benefits Kaleshwaram Lift Irrigation Scheme of Telangana is one of the world’s biggest irrigation

project that is set to end water woes of the state where many regions are parched. This project aims at an ambitious target of diverting 195 TMC of water to the backward areas in the state of Telangana. The project envisages the following:

1. Diversion of 195 TMC of Godavari water to Sripada Rao Yellampally project and subsequently to Mid Manair Reservoir by lifting it to the lands on higher contour which is found to be economically viable, to bring large extents of lands in the basin under irrigation.

2. To Create an additional ayacut of about 18.25 lakhs acres in Adilabad, Karimnagar, Medak, Nalgonda, Nizamabad and Ranga Reddy districts including 40 TMC of drinking water to several towns and cities of the state, especially the most important twin cities of Hyderabad and Secunderabad and en route villages and 16 TMC of water for Industrial use and 18.82 Lakh acres of stabilization ayacut.

3. To stabilize shortfalls in planned utilization, under SRSP Stage-I & Stage-II, Flood Flow Canal, Singur project and Nizam Sagar project.

4. To restore the ground water level to its original state by the way of shifting from usage of groundwater for irrigation to usage of surface water and conjunctive use of groundwater for the same.

Key Features of Link-VII

Gravity Canal

246.83 km

Tunnel & Pressure Main

37.175 km &

47.67 km

9 Reservoirs Total Storage

capacity

25.99 TMC Ayacut (acres)

5,39,428

Pump House

7

Foreshore of SRSP reservoir

Balancing reservoir near Masani(V)

Nirmal & Mudhole

8. Statutory Clearances The prestigious Kaleshwaram project taken up by the Telangana State Government has secured all

the necessary clearances from Central Water Commission (CWC).

The major agreement with the Maharashtra government paved the way for early clearances for the project. The project has received ten clearances in a year including for hydrology and environment.

Here is the list of all the necessary approvals accorded with the dates.

KALESHWARAM PROJECT

SL. NO.

NAME OF DIRECTORATE/ MINISTRY/ BOARD

STATUS OF CLEARANCE

1 Hydrology (S) Clearance received from CWC vide Lr.F.No.6/231/2017-PA (S)/1327-28, dt:30-10-2017.

2 Inter State Matters (ISM) Clearance received from CWC vide Lr.No. U.No. 4/2/TEL./ISM-I/2017/927-928, Dt: 03-11-2017 & Lr.No. U.No. 4/2/TEL./ISM-I/2017/974, Dt: 30-11-2017

3 Construction Machinery Consultancy (CMC)

Clearance received from CWC vide U.O.No.21/Telangana/02/2017- CMC/432,dt:24-11-2017.

4 Irrigation Planning (S) Clearance received CWC ID No.2/148/IP (S)/2013/272 Dt: 13-04-2018 and B.C. Ratio finalized vide CWC ID No.2/1481/IP (S)/2013/320 Dt: 11-05-2018. 5

Ministry of Agriculture & Farmers Welfare (MoA &FW)

6 Cost Appraisal (I) Finalized Cost received from CWC vide ID No.10-A/27/2017/CA(I)- 2/77, dt:01-05-2018.

7 Central Soil & Materials Research Station (CSMRS)

Clearance received from CSMRS vide U.O. No.29/36/Kaleshwaram/RM-I/CSMRS/2017/308, dt:21-05-2018.

8 Ministry of Environment, Forest and Climate Change (MoEF & CC)

1) Environmental Clearance: Environmental clearance received from MoEF vide Lr. No.J- 12011/1/2017-IA-I( R) Dt: 22-12-2017

2) Forest Clearance: Stage-I clearance received from MoEF vide F.No 8-31/2017-FC Dt: 24-10-2017 Stage-II clearance received from MoEF vide F.No 8-31/2017-FC Dt: 24-11-2017

9 Central Ground Water Board (CGWB)

Clearance received vide Lr No: 4-1/CWC-PA/SML-CGWB/2017-1945, Dt: 21-11-2017

10 Technical Advisory Committee (TAC)

Acceptance of Kaleshwaram Project in the 136th TAC Meeting held on 06-06-2018 communicated by CWC through Minutes vide Lr.No. 16/27/2018-PA(N)/939-70, dt:14-06-2018.

CONSTITUENCYWISE MANDALWISE AYACUT PARTICULARS Sl.

No. Name of the Constituency

Name of the District

AYACUT (in acres)

Name of Mandal AYACUT (in acres)

Pkg No

AYACUT (in acres)

1 Sircilla Rajanna Sircilla 103305 Gambhiraopet 24609 9 15500 12 9109

Mustabad 23981 9 10000 11 1971 12 12010

Sirsilla 8000 9 8100 11 20540

Yellareddi peta 26075 9 26075 Sub Total 103305 103305 103305

2 Vemulawada Rajanna Sircilla 26475 Konaraopeta 17000 9 17000 Vemulawada 9475 9 9475

Sub Total 26475 26475 26475 3 Manakondur Karimnagar 800 Ganneruvaram 800 10 800

Rajanna Sircilla 23759 Illanthakunta 23759 10 14000 11 9759

Siddipet 15000 Bejanki 15000 10 15000 Sub Total 39559 39559 39559

4 Husnabad Siddipet 2263 Koheda 2263 11 2263 Sub Total 2263 2263 2263

5 Siddipet Siddipet 107028 Chinnakodur 25620 10 200 11 25420

Siddipet U 22249 11 4589 12 17660

Siddipet R 31811 11 13789 12 18022

Nagnoor 27348 11 23621 12 3727

Sub Total 107028

107028 107028 6 Korutla Jagityal 19979 Metpalli 12442 21 12442

Ibrahimpatnam 7537 21 7537 Sub Total Sub-total

19979

19979 19979 7 Dubbak Siddipet

114588 Dubbak 39730 12 37164

13 2566 Mirdoddi 28036 12 11655

13 16381 Thoguta 15864 12 13493

13 2371 Raipolu 506 13 506 Doulathabad 30452 13 1438

14 29014 Medak 18164 Chegunta 18164 13 333

14 15331 22 2500

Sub Total

132752 132752 132752

8 Gajwel Siddipet

82958 Kondapak 2429 11 269

12 2160

Gajwel 24217 13 3705

14 20512

Jagdevpur 13675 14 12804

15 871

Mulugu 13749 14 13749

Markoor 7658 14 7658

Wargal 21230 14 21230

Medak 15572 Tupran 15572 14 15572

Sub Total

98530 98530 98530

9 Jangaon Siddipet

7779 Maddur 5318 11 5318

Cheriyal 2461 11 2461

Sub Total

7779 7779 7779

10 Medak Medak 99693 Koheda 10952 13 10952

Nizampet

Ramayampet 18639 13 400

14 7019

22 11180

Shankarampet 29493 14 11493

22 18000

Papannapet 23389 19 23389

Nizampet (New) 9620 22 9620

Medak 7600 22 7600

Sub Total 99693 99693 99693

11 Narsapur Medak 69900 Shivampet 12816 14 12816

Narsapur 10347 14 10347

Yeldurthi

16659 14 2701

18 9958

22 4000

Kowdipally 20862 14 7244

18 1394

19 12224

Kulcharam 9216 18 3648

19 5568

Sangareddy 27837 Hathnura 27837 14 20629

19 7208

Sub Total 97737 97737 97737

12 Andole Medak 30317 Alladurg 8827 19 8827

Tekmal 18920 19 18920

Regod 2570 19 2570

Sangareddy 64357 Munipally 33902 26 33902

Raikode 24110 26 24110

Sub Total 94674 94674 94674

13 Alair Yadadri 150279 M.Turkapalli 20530 14 13587 15 3790 16 3153

Bommala Ramaram 13758 14 13758 Rajapet 35131 15 35131 Alair 18910 15 12420

16 6490 Bibinagar 8000 16 8000 Yadagirigutta 34610 15 11088

16 23522 Atmakur 19340 16 19340

Sub Total Sub-total

150279 150279 150279 14 Bhongir Yadadri 15139 Bhongir 20012 16 20012

Valigonda 39466 16 39466 Pochampally 7000 16 7000

Sub Total 66478 66478 66478 15 Munugode Yadadri 6537 Choutuppal 6537 16 6537

Sub Total

6537 6537 6537 16 Nakrekal Yadadri 25811 Ramannapet 25811 16 25811

Nalgonda 29169 Chityal 27221 16 27221 Narketpally 1948 16 1948

Sub Total

54980 54980 54980 17 Narayankhed Medak 13772 Shankarampet(A) 13772 19 13772

Sangareddy 18177 Narayankhed 12959 19 12959 Kalher 5218 19 5218

Sub Total

31949 31949 31949 18 Sangareddy Sangareddy 64044 Kondapur 19349 26 19349

Sangareddy 10404 14 10404 Sadashivapet 34291 26 34291

Sub Total

64044 64044 64044 19 Patancheru Sangareddy 9939 Patancheru 6830 14 6830

Jikkinaram 3109 14 3109 Sub Total

9939 9939 9939

20 Zaheerabad Sangareddy 36644 Jharasangam 18303 26 18303 Kohir 1644 26 1644 Nyalkal 16697 26 16697

Sub Total

36644 36644 36644 21 Armur Nizamabad 1876 Armur 635 21 635

Makloor 1241 21 1241 Sub Total

1876 1876 1876

22 Balkonda Nizamabad 71262 Bheemgal 27145 21 27145 Kammar Palle 17712 21 17712 Mortad 19586 21 19586 Yeragatla 316 21 316 Velpur 6503 21 6503

Sub Total

71262 71262 71262

23 Nizamabad (R) Nizamabad 106311 Nizamabad 169 21 169 Mugpal 15669 21 15669 Indalwai 12368 21 12368 Dhar palle 27283 21 27283 Dich palle 18554 21 18554 Jakranpalle 10547 21 10547 Sirkonda 21721 21 21721

Sub Total

106311 106311 106311 24 Kamareddy Kamareddy 82508 Machareddy 11883 22 11883

Kamareddy 16500 22 16500 Domakonda 13926 22 13926 Bhiknur 17129 22 16983 13 146 Bibipet (new) 6217 22 6217 Ramareddy(new) 6817 22 6817

Sub Total

82508 82508 82508 25 Yellareddy Kamareddy 95200 Ramareddy(new) 5874 22 5874

Rajampet(new) 4024 22 4024 Gandhari 21000 22 21000 Sadashivanagar 19326 22 19326 Tadwai 20576 22 20576 Nagireddypet 3100 22 3100 Lingampet 18100 22 18100 Yellareddy 3200 22 3200

Sub Total

95200 95200 95200 26 Banswada Nizamabad 3300 Varni 3300 22 3300

Kamareddy 6400 Birkur 1700 22 1700 Banswada 4700 22 4700

Sub Total

9700 9700 9700 27 Nirmal Nirmal 41336 Dilwarpur 6873 27 6873

Laxmanchanda 2622 27 2622 Mamda 6151 27 6151 Sarangapur 2924 27 2924 Nirmal 8814 27 8814 Narsapur 6734 27 6734 Kuntala 7218 27 7218

Sub Total

41336 41336 41336 28 Mudhole Nirmal 58664 Bhainsa 16664 27 8664

28 8000 Mudhole 25000 28 25000 Tanur 16000 28 16000 Kubeer 1000 28 1000

Sub Total

58664 58664 58664 29 Medchal Medchal 29473 Keesara&Ghatkesar 20000 14 20000

Shameerpet 9473 14 9473 Sub Total

29473 29473 29473

30 Manthani 30000 30000 Brgs 30000 Sub Total

30000 30000 30000

31 Additional Ayacut