Design Documentation – Week 5 - Testing
Course ID: IT 491 CAPSTONE PROJECT
Instructions:
This template must be filled out completely and turned into the course instructor by the end of the 5th week of class by Midnight. If you need assistance please contact the instructor prior to the due date.
Please note: The best method to ask questions is via email using Blackboard Messages.
Due Date: Last day of week 5 by midnight.
Name:
Aaron Black
Testing Plan:
Using your prior week’s work, develop testing plan.
Key tasks / items to consider:
Please note: Test Results for all of the following items need to be included with your uploaded work for this week.
PERFORMANCE TEST:
Using the needs that you determined earlier in the term, create a test plan to ensure that your new technology is producing the desired results. You need to clearly define the desired results and then measure. Be sure to take screenshots to show the success (or failure) of various tests.
|
NEED/TEST ONE (10 points) |
|
|
Project Need As listed in your week 2 needs assessment |
Database |
|
Test Plan How will you know that the project need has been met by your technology solution? |
When the data of customers, employees, other forms of data have been stored in one place where they can easily be retrieved. |
|
Test Result What happened as a result of your test? Did you run into any problems? Were you able to successfully complete the task? |
I was to integrate all the relevant data of the organization under one platform. The configuration of the database and the windows server as well as the ticketing software was quite challenging. The task of integrating a database into the system was a success |
|
Screenshots Include screenshots that show the success (or failure) of the test. |
|
|
NEED/TEST TWO (10 points) |
|
|
Project Need As listed in your week 2 needs assessment |
Network infrastructure |
|
Test Plan How will you know that the project need has been met by your technology solution? |
When the network communication within the organization was functioning and employees were able to access internet communication |
|
Test Result What happened as a result of your test? Did you run into any problems? Were you able to successfully complete the task? |
The organization was able to access internet. The only difficulty was coming up with the most effective network design that would suit our need. The task was successful since internet communication could be accessed |
|
Screenshots Include screenshots that show the success (or failure) of the test. |
|
|
NEED/TEST THREE (10 points) |
|
|
Project Need As listed in your week 2 needs assessment |
Access control |
|
Test Plan How will you know that the project need has been met by your technology solution? |
When only people who had the permission to access the system were able to do so |
|
Test Result What happened as a result of your test? Did you run into any problems? Were you able to successfully complete the task? |
Unauthorized people could not access our system. The only problem was ensuring the mechanisms we had put in place were secure enough from external attack. The task was successful since people had to put in there passwords to access the system |
|
Screenshots Include screenshots that show the success (or failure) of the test. |
|
|
NEED/TEST FOUR (10 points) |
|
|
Project Need As listed in your week 2 needs assessment |
Backup and recovery |
|
Test Plan How will you know that the project need has been met by your technology solution? |
When we would be able to recover any information that was lost in case there was a system failure. |
|
Test Result What happened as a result of your test? Did you run into any problems? Were you able to successfully complete the task? |
The test enabled consistency of work flow since no data would be able to be lost due to failure. We found it difficult to integrate the back-up software into our system, until we reached to the assistance of the technical team in which we had bought that software. The task was successful since we our back up system was up and running in case of any emergency. |
|
Screenshots Include screenshots that show the success (or failure) of the test. |
|
|
NEED/TEST FIVE (10 points) |
|
|
Project Need As listed in your week 2 needs assessment |
Data integrity |
|
Test Plan How will you know that the project need has been met by your technology solution? |
When the information stored in the database is accurate, complete and reliable, no matter how often it’s accessed. |
|
Test Result What happened as a result of your test? Did you run into any problems? Were you able to successfully complete the task? |
We were able to access the information of the system anytime we wanted without it being compromised. We did not run into any problem. The task was completed successfully since no one questioned the integrity of data that they were using. |
|
Screenshots Include screenshots that show the success (or failure) of the test. |
|