IT Manager’s Handbook Third Edition

This page intentionally left blank

IT Manager’s Handbook Getting your new job done

Third Edition

Bill Holtsnider

Brian D. Jaffe

AMSTERDAM • BOSTON • HEIDELBERG • LONDON NEW YORK • OXFORD • PARIS • SAN DIEGO

SAN FRANCISCO • SINGAPORE • SYDNEY • TOKYO Morgan Kaufmann is an imprint of Elsevier

Acquiring Editor: Andrea Dierna

Development Editor: Robyn Day

Project Manager: Jessica Vaughan

Designer: Joanne Blank

Morgan Kaufmann is an imprint of Elsevier

225 Wyman Street, Waltham, MA 02451, USA

# 2012 William Holtsnider & Brian D. Jaffe. Published by Elsevier, Inc. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or by any means, electronic or

mechanical, including photocopying, recording, or any information storage and retrieval system, without

permission in writing from the publisher. Details on how to seek permission, further information about the

Publisher’s permissions policies and our arrangements with organizations such as the Copyright Clearance

Center and the Copyright Licensing Agency, can be found at our website: www.elsevier.com/permissions.

This book and the individual contributions contained in it are protected under copyright by the Publisher (other

than as may be noted herein).

Notices

Knowledge and best practice in this field are constantly changing. As new research and experience broaden

our understanding, changes in research methods or professional practices, may become necessary. Practitioners

and researchers must always rely on their own experience and knowledge in evaluating and using any

information or methods described herein. In using such information or methods they should be mindful of their

own safety and the safety of others, including parties for whom they have a professional responsibility.

To the fullest extent of the law, neither the Publisher nor the authors, contributors, or editors, assume any liability

for any injury and/or damage to persons or property as a matter of products liability, negligence or otherwise, or

from any use or operation of any methods, products, instructions, or ideas contained in the material herein.

Library of Congress Cataloging-in-Publication Data

Holtsnider, Bill, 1956-

It manager’s handbook : getting your new job done / Bill Holtsnider, Brian D. Jaffe. – 3rd ed.

p. cm.

Summary: “This book provides a practical reference that you will return to again and again in an ever-

changing corporate environment where the demands on IT continue to increase. Make your first 100 days really

count with the fundamental principles and core concepts critical to your success as a new IT Manager outlined

in this valuable resource. The book also discusses how to work with your customers, manage your budget,

develop an overall IT strategy and demonstrate the value of IT to the company”– Provided by publisher.

ISBN 978-0-12-415949-5 (pbk.)

1. Industrial management–Data processing. 2. Management information systems. I. Jaffe, Brian D. II. Title.

HD30.2.H657 2012

004.068–dc23

2011044174

British Library Cataloguing-in-Publication Data A catalogue record for this book is available from the British Library.

ISBN: 978-0-12-415949-5

Printed in the United States of America

12 13 14 15 16 10 9 8 7 6 5 4 3 2 1

For information on all MK publications visit our website at www.mkp.com

For M & D —B.H.

For Jenine —B.D.J.

This page intentionally left blank

About the Authors

Bill Holtsnider is an experienced writer, educator, and software professional with more than 27 years of experience working in the computer industry. His IT expertise includes working in such diverse

areas as stock portfolio management, identity management, Web analytics, and software develop-

ment. He is the author of six books and a wide range of technical and marketing documentation.

Brian D. Jaffe is an IT professional who has worked for several Fortune 500 companies including Bristol-Myers Squibb, Time Warner, Philip Morris, and The Interpublic Group of Companies. Cur-

rently he is Senior Vice President for Global IT at McCann Worldgroup in New York City, one of

the country’s leading advertising agencies. His articles have appeared in Computerworld, InfoWorld, eWeek, and The New York Times, and he is the editor of Thanksgiving Tales: True Stories of the Holiday in America.

vii

This page intentionally left blank

Brief Table of Contents

About the Authors vii

Key Changes for This Edition xxi

Preface xxiii

CHAPTER 1 The Role of an IT Manager 1

CHAPTER 2 Managing Your IT Team 31

CHAPTER 3 Staffing Your IT Team 65

CHAPTER 4 Project Management 103

CHAPTER 5 Software, Operating Systems, and Enterprise Applications 135

CHAPTER 6 Managing the Money 161

CHAPTER 7 Getting Started with the Technical Environment 189

CHAPTER 8 Security and Compliance 205

CHAPTER 9 Disaster Recovery 247

CHAPTER 10 Working with Users 263

CHAPTER 11 Connectivity: Social Media, Handhelds, and More 287

Glossary 305

Index 317

ix

This page intentionally left blank

Contents

About the Authors ............................................................................................................................... vii

Brief Table of Contents ........................................................................................................................ ix

Key Changes for This Edition............................................................................................................ xxi

Preface .............................................................................................................................................. xxiii

CHAPTER 1 The Role of an IT Manager............................................................................... 1 1.1 Just What Does an IT Manager Do? .......................................................................... 2

Why All That Change and Flexibility Is Good.......................................................... 2

Why All That Change and Flexibility Is Bad ............................................................ 2

1.2 Managers in General................................................................................................... 3

Definition of a Manager ............................................................................................. 3

Styles of Management ................................................................................................ 3

Pros and Cons of Being a Manager: Reasons to Become a Manager, and

Reasons Not to Become One...................................................................................... 5

The Hidden Work of Management............................................................................. 6

Resentment toward Management ............................................................................... 7

Babysitting versus Managing ..................................................................................... 7

Politics......................................................................................................................... 7

Managing in Four Directions...................................................................................... 7

1.3 The Strategic Value of the IT Department ................................................................ 8

Application Development versus Technical Operations............................................ 9

IT Department Goals ................................................................................................ 10

The Value of IT Managers ....................................................................................... 10

1.4 Developing an IT Strategy ....................................................................................... 10

Determine Who Your Team Members Are.............................................................. 11

Determine How Important Technology Is to Your Organization ........................... 11

Determine Who Your Customers Are and What Their Needs Are......................... 12

Keep Your Department Central to the Company’s Operations............................... 12

1.5 Leadership versus Management ............................................................................... 13

1.6 Starting Your New Job ............................................................................................. 14

The First Day ............................................................................................................ 14

Meeting the Staff ...................................................................................................... 14

A Few Ideas for What to Say to Break the Ice........................................................ 15

Some Don’ts.............................................................................................................. 15

One-on-One Meetings............................................................................................... 15

What to Say to Those Who Wanted Your Job and Didn’t Get It ........................... 16

Establish a Relationship with Your Manager and Your Peers ................................ 17

Learning the Landscape: Key Users and Key Applications .................................... 18

xi

1.7 The First 100 Days ................................................................................................... 20

No Organization Is Perfect ....................................................................................... 20

Quietly Advertising What You Bring to the Table ................................................. 21

Projects in Progress and Projects on the Horizon.................................................... 22

Is the Status Quo Good Enough? ............................................................................. 23

People to Meet and Know ........................................................................................ 24

Quick Introductory Meetings.................................................................................... 24

Human Resource Issues ............................................................................................ 25

Budgeting .................................................................................................................. 26

Making Those First Decisions.................................................................................. 26

1.8 Two IT Departments—What Happens If Your Company Merges

with Another?............................................................................................................ 27

CHAPTER 2 Managing Your IT Team................................................................................. 31 2.1 Keeping Employees Focused.................................................................................... 32

Establish Priorities .................................................................................................... 32

Communicate with Your Team ................................................................................ 32

Company Mission, Vision, and Values .................................................................... 34

Be as Clear as Possible about Your Real Priorities................................................. 35

Avoid Burnout in Your Employees.......................................................................... 35

Make Your Employees Aware of the Dangers of Burnout ..................................... 36

Deal with the Situation ............................................................................................. 36

Managing Remote Workers (or Teleworkers) ......................................................... 37

2.2 Employee Training ................................................................................................... 39

Cost ........................................................................................................................... 39

Need .......................................................................................................................... 39

Scheduling Demands ................................................................................................ 40

Employee Morale...................................................................................................... 40

How Do You Know When Your Employees Need Training? ................................ 40

Certification .............................................................................................................. 41

What If the Employee Takes a Training Class and Then Uses His New-Found

Skills to Find Another Job? ...................................................................................... 41

Nontechnical Training .............................................................................................. 42

Maximizing the Value of Training........................................................................... 42

2.3 Employee Performance............................................................................................. 43

Performance Reviews ............................................................................................... 43

Key Areas of Evaluation .......................................................................................... 44

Specific Evaluation Statements ................................................................................ 47

Guidelines for Reviews............................................................................................. 48

Negative Reviews ..................................................................................................... 49

Have Employees Review Themselves ..................................................................... 50

360 Reviews.............................................................................................................. 51

xii Contents

How to Conduct the Actual Review Discussion...................................................... 52

Development Plans and Goals.................................................................................. 52

Salary Review ........................................................................................................... 53

Disciplinary Problems and Terminations ................................................................. 54

2.4 Generational Issues at Work..................................................................................... 57

Managing across Generations................................................................................... 58

CHAPTER 3 Staffing Your IT Team.................................................................................... 65 3.1 Why IT Managers Need to Deal with Hiring People .............................................. 65

Human Resources Department’s Role ..................................................................... 66

Justifying a Hire........................................................................................................ 67

Start with Internal and External Referrals ............................................................... 68

Internal versus External Hires .................................................................................. 68

Should You Hire a Full-Time Employee or a Consultant? ..................................... 70

3.2 Write a Position Description .................................................................................... 74

Position Descriptions versus Contracts .................................................................... 75

General Requirements............................................................................................... 75

Advertising Options .................................................................................................. 77

3.3 Recruiters .................................................................................................................. 79

Finding the Right Recruiter ...................................................................................... 81

3.4 Selecting Candidates................................................................................................. 83

Reviewing Résumés.................................................................................................. 83

Telephone Screening................................................................................................. 84

At What Level Should I Interview? ......................................................................... 84

Narrowing Down the List ......................................................................................... 84

General Interview Guidelines ................................................................................... 86

Prepare a List of Questions ...................................................................................... 87

Who Else Should Interview a Candidate? ............................................................... 88

Key Concepts for a Good Technical Interview ....................................................... 89

Rank Criteria............................................................................................................. 93

The Value of Certification........................................................................................ 94

Education .................................................................................................................. 95

Checking References ................................................................................................ 97

Common Hiring Mistakes......................................................................................... 98

Offering the Correct Salary for an IT Position ........................................................ 99

CHAPTER 4 Project Management ................................................................................... 103 4.1 Projects and Project Management: A Quick Overview ......................................... 104

Different Kinds of Projects..................................................................................... 104

The Value of Project Management ........................................................................ 104

Five Key Phases to a Project.................................................................................. 104

Do You Have to Be a Certified Project Manager to Run a Project? .................... 105

xiiiContents

The Project Management Institute (PMI) .............................................................. 105

A Project Management Office................................................................................ 106

4.2 Phase One: Scope the Project................................................................................. 106

Clearly Define the Project’s Objective and Scope to Avoid Scope Creep ........... 106

Department versus Company Objectives ............................................................... 107

Get Proper Sponsorship for the Project.................................................................. 107

Identify the Stakeholders ........................................................................................ 108

Identify the Constraints, Interdependencies, and Risks ......................................... 109

The Project Charter................................................................................................. 110

Get Historical Perspective ...................................................................................... 110

4.3 Phase Two: Develop a Project Plan ....................................................................... 111

Three Critical Components to Any Project............................................................ 111

Write the Project Plan with the Closeout Report in Mind .................................... 112

Time Estimates ....................................................................................................... 112

Resources Required: Employees (Internal and External to IT)............................. 113

Money ..................................................................................................................... 114

Roles and Responsibilities...................................................................................... 115

Multiple Projects..................................................................................................... 115

4.4 Phase Three: Launch the Project............................................................................ 116

Range of Launch Options....................................................................................... 116

Stage a Kick-Off Meeting ...................................................................................... 116

4.5 Phase Four: Track the Project’s Progress .............................................................. 117

Microsoft Project .................................................................................................... 117

Other Project Management Tools........................................................................... 118

Gantt Charts and Time Lines ................................................................................. 118

PERT Charts and Critical Paths ............................................................................. 118

Project Milestones................................................................................................... 119

Updates to Management and the Team.................................................................. 120

4.6 Phase Five: Close Out the Project.......................................................................... 121

Writing a Closeout Report...................................................................................... 121

4.7 Decision-Making Techniques ................................................................................. 122

Four Types of Decision-Making Methods ............................................................. 122

4.8 What to Do If/When the Project Gets Off Track................................................... 123

Some Issues out of Your Control ........................................................................... 124

When a Project Gets behind Schedule ................................................................... 124

Your Project Is Costing More Than Expected....................................................... 125

4.9 Useful Project Management Techniques................................................................ 126

Project Teams ......................................................................................................... 126

Create a War Room ................................................................................................ 126

Formalized Project Frameworks............................................................................. 127

xiv Contents

Participate in the Project Yourself ......................................................................... 127

Offer Project Perks ................................................................................................. 127

Give Your Project a Code Name............................................................................ 127

Productive Project Meetings................................................................................... 128

4.10 Funding Projects ..................................................................................................... 130

Estimating Costs: Go High..................................................................................... 130

Projects Always Cost More Than Estimated ......................................................... 131

Exactly Who Is Going to Pay for It? ..................................................................... 131

Justifying the Costs................................................................................................. 132

4.11 Multiple Projects: How to Juggle Them Well ....................................................... 132

You Will Have Multiple Projects........................................................................... 132

4.12 Dealing with Non-IT Departments on a Project .................................................... 133

Motivating Employees outside of Your Department ............................................. 133

Who Is in Charge? .................................................................................................. 133

CHAPTER 5 Software, Operating Systems, and Enterprise Applications ............................. 135 5.1 Types of Software................................................................................................... 135

5.2 Operating Systems .................................................................................................. 137

Windows ................................................................................................................. 137

Mac.......................................................................................................................... 137

Unix Variants and Linux ........................................................................................ 138

Choosing an Operating System .............................................................................. 138

Multiple Operating Systems ................................................................................... 139

5.3 Open Source............................................................................................................ 141

Definition ................................................................................................................ 141

Cost ......................................................................................................................... 142

5.4 Managing Software................................................................................................. 142

Total Cost of Ownership (TCO)............................................................................. 142

Software Management Techniques ........................................................................ 142

Software Licensing ................................................................................................. 144

Licensing Issues ...................................................................................................... 145

5.5 Cloud Computing.................................................................................................... 148

The Many Flavors of Cloud Computing ................................................................ 148

Private versus Public Cloud.................................................................................... 149

Considerations When Moving to the Cloud........................................................... 150

5.6 Enterprise Applications........................................................................................... 152

E-mail...................................................................................................................... 152

Managing E-mail .................................................................................................... 153

Unified Messaging .................................................................................................. 155

Directory Services................................................................................................... 156

xvContents

5.7 Enterprise Resource Planning (ERP) ..................................................................... 157

The Value of ERP Software ................................................................................... 157

General ERP Implementation Issues ...................................................................... 157

Costs of Implementing ERP ................................................................................... 158

Major Changes Required ........................................................................................ 158

It Isn’t Only IT’s Decision ..................................................................................... 158

Disadvantages to ERP............................................................................................. 159

CHAPTER 6 Managing the Money ................................................................................... 161 6.1 The Budgeting Process ........................................................................................... 161

Possible Budget Items............................................................................................. 162

Chargebacks—Who Really Pays? .......................................................................... 164

Reviewers for Your Budget.................................................................................... 164

Estimating (and Overestimating) Your Numbers .................................................. 165

Getting Approval and Defending Your Budget ..................................................... 165

During the Year: Tracking and Revising Your Budget......................................... 166

6.2 The Difference between Capital Expenditures and Operating

Expense Items ......................................................................................................... 167

Capital Expenditure Details.................................................................................... 167

Check with Your Company’s Policies ................................................................... 168

Gray Areas .............................................................................................................. 168

6.3 Lease versus Buy: Which One Is Better? .............................................................. 168

Leasing .................................................................................................................... 169

Who Makes This Decision?.................................................................................... 170

6.4 Other Budgeting Factors to Consider..................................................................... 170

Growth of Your Department’s Workload .............................................................. 170

Technological Change ............................................................................................ 171

Staff ......................................................................................................................... 171

Software Maintenance ............................................................................................ 171

Hardware Maintenance ........................................................................................... 172

6.5 Managing Vendors.................................................................................................. 173

Establish a Relationship.......................................................................................... 173

Help Your Vendors................................................................................................. 174

Request for Proposals ............................................................................................. 174

Get Multiple Bids ................................................................................................... 175

Set Up a Trial.......................................................................................................... 175

Reviewing Contracts with Vendors........................................................................ 175

Evaluating Alternatives........................................................................................... 176

Set Up a Matrix ...................................................................................................... 177

6.6 Managing the Money during Difficult Times ........................................................ 179

xvi Contents

Managing Costs ...................................................................................................... 179

Leverage IT for Increased Business Value ............................................................ 180

Demonstrating Leadership...................................................................................... 181

6.7 Outsourcing and Offshoring ................................................................................... 182

Offshore Outsourcing Overview............................................................................. 182

Which Functions to Outsource ............................................................................... 184

Does Outsourcing Make Sense? ............................................................................. 184

CHAPTER 7 Getting Started with the Technical Environment ............................................ 189 7.1 The Technical Environment ................................................................................... 189

What Do We Have Here?....................................................................................... 189

Define Your Scope ................................................................................................. 190

The Elements .......................................................................................................... 190

Tools for Tracking the Technical Environment..................................................... 194

The Value of Good Infrastructure Documentation ................................................ 195

What You May Find............................................................................................... 196

7.2 Understanding the User Environment .................................................................... 196

7.3 TCO and Asset Management: What Are They? .................................................... 196

Total Cost of Ownership ........................................................................................ 197

Asset Management.................................................................................................. 198

7.4 Standards ................................................................................................................. 199

Issues That Users Care About ................................................................................ 199

Issues That IT Cares About .................................................................................... 200

Standards for IT ...................................................................................................... 201

7.5 Technology Refreshing........................................................................................... 201

CHAPTER 8 Security and Compliance ............................................................................. 205 8.1 How We Got Here .................................................................................................. 206

Get Perspective ....................................................................................................... 206

Computer Security Themes .................................................................................... 207

8.2 Managing Security .................................................................................................. 209

Action 1: Evaluate Your Environment’s Needs, Exposures, and Defenses.......... 209

Action 2: Get Upper Level Management Buy-In .................................................. 212

Action 3: Mitigate the Risks................................................................................... 212

Action 4: Work with Users to Make Everyone More Secure ............................... 213

Action 5: Remember That Security Is an Ongoing Process .................................. 214

8.3 Security Solutions and Technologies ..................................................................... 214

Tracking and Controlling Access ........................................................................... 214

Authentication......................................................................................................... 219

Security Defenses.................................................................................................... 220

Security Incident Response .................................................................................... 223

xviiContents

8.4 Types of Threats ..................................................................................................... 224

Malware................................................................................................................... 224

Phishing and Social Engineering............................................................................ 225

8.5 Compliance and IT ................................................................................................. 226

Overview ................................................................................................................. 226

Victims of Non-Compliance................................................................................... 227

8.6 The Rules ................................................................................................................ 227

Sarbanes–Oxley....................................................................................................... 227

Health Insurance Portability and Accountability Act (HIPAA) ............................ 228

Basel II .................................................................................................................... 229

SB-1386................................................................................................................... 230

Massachusetts Data Protection Law....................................................................... 230

Fair and Accurate Credit Transactions Act (FACTA)........................................... 231

Gramm–Leach–Bliley............................................................................................. 231

U.S. Securities......................................................................................................... 232

Patriot Act ............................................................................................................... 232

Dodd–Frank Act...................................................................................................... 233

Office of Foreign Assets Control (OFAC)............................................................. 233

CLERP-9 (Australia) .............................................................................................. 233

Personal Information Protection and Electronic Documents Act (PIPEDA)........ 233

Privacy and Electronic Communications Directive (European Union)................. 234

Data Protection Directive (European Union)......................................................... 234

8.7 How to Comply with the Rules.............................................................................. 234

Document the Policies ............................................................................................ 235

Identify Control Mechanisms ................................................................................. 236

Educate Employees................................................................................................. 236

Maintain Evidence .................................................................................................. 236

8.8 Hidden Benefits of Compliance ............................................................................. 237

The Hidden Benefit of Documentation .................................................................. 237

The Hidden Benefit of Control Mechanisms ......................................................... 237

The Hidden Benefit of Educating Your Employees .............................................. 237

Hidden Benefits of Maintaining Evidence............................................................. 238

8.9 Methodologies and Frameworks............................................................................. 238

IT Governance ........................................................................................................ 238

Committee of Sponsoring Organizations (COSO)................................................. 239

Control Objectives for Information and Related Technology (COBIT) ............... 239

IT Infrastructure Library (ITIL) ............................................................................. 240

Capability Maturity Model Integration (CMMI) ................................................... 240

International Organization for Standards (ISO 9000)............................................ 240

Six Sigma ................................................................................................................ 241

xviii Contents

8.10 It’s Not Just Regulatory Compliance ..................................................................... 242

Electronic Discovery............................................................................................... 242

Information and Records Retention ....................................................................... 242

Working with Auditors ........................................................................................... 242

Disaster Recovery and Business Continuity .......................................................... 243

Definition of Policies and Procedures.................................................................... 243

Outsourcing ............................................................................................................. 244

CHAPTER 9 Disaster Recovery ....................................................................................... 247 9.1 Defining the Scope ................................................................................................. 248

Key Questions ......................................................................................................... 248

Recovery Time and Recover Point Objectives ...................................................... 249

Disaster Recovery Committee ................................................................................ 249

Application Assessment.......................................................................................... 250

The Value of Your Data ......................................................................................... 252

9.2 Creating a Disaster Recovery Plan......................................................................... 253

Communication Plan............................................................................................... 253

Documentation ........................................................................................................ 254

Real Estate and IT Facilities .................................................................................. 254

Off-Site Storage of Data......................................................................................... 256

Hardware Availability............................................................................................. 257

Regular Updating and Testing................................................................................ 257

After the Disaster.................................................................................................... 259

Regional and Catastrophic Disasters ...................................................................... 259

The ACT Model...................................................................................................... 259

9.3 A Word about Incident Response, Business Continuity,

and Disaster Recovery ............................................................................................ 260

9.4 The Hidden Benefits of Good Disaster Recovery Planning .................................. 261

CHAPTER 10 Working with Users..................................................................................... 263 10.1 Relationships with Users ........................................................................................ 263

Who Are Your Users? ............................................................................................ 264

Find Out Who Your Department Thinks Its Users Are......................................... 264

Find Out Who Your Boss Thinks Your Users Are................................................ 265

Meet the Users ........................................................................................................ 265

Being Available and Reachable ............................................................................. 266

Sharing Information ................................................................................................ 266

Collecting Information............................................................................................ 267

Proactive Solutions ................................................................................................. 268

Being Flexible......................................................................................................... 270

User Training .......................................................................................................... 270

xixContents

10.2 The Consumerization of IT .................................................................................... 271

How to Deal with Consumerization ....................................................................... 272

Support Issues Associated with Consumerization and Handheld Devices............ 272

Bring Your Own (BYO) Policies ........................................................................... 273

10.3 When Your Users Are Part of a Mobile Work Force............................................ 274

Techniques for Supporting Your Mobile Users ..................................................... 274

10.4 The Help Desk ........................................................................................................ 275

Typical Help Desk Activities ................................................................................. 276

Procedures ............................................................................................................... 276

Access ..................................................................................................................... 277

Self-Service ............................................................................................................. 277

Tools........................................................................................................................ 278

User Surveys ........................................................................................................... 280

Measuring the Help Desk Workload...................................................................... 281

Staffing.................................................................................................................... 281

10.5 Service Level Agreements...................................................................................... 283

Positive Values of SLAs......................................................................................... 283

Ask for Help from Your Staff ................................................................................ 283

Writing Good SLAs................................................................................................ 284

CHAPTER 11 Connectivity: Social Media, Handhelds, and More......................................... 287 11.1 Get in Front of the Curve ....................................................................................... 288

The Blurry Line between Company-Owned and Personally-Owned Equipment

(BYO Policies)........................................................................................................ 288

The New Technologies of Connectedness ............................................................. 289

Benefits and Challenges of Connectivity............................................................... 290

Dealing with a Lot More Empowered Users ......................................................... 292

Wisdom of Crowds ................................................................................................. 293

11.2 The Power of All These Connections .................................................................... 293

How Companies Use the Web ............................................................................... 293

How Companies Use Intranets ............................................................................... 294

How Companies Use Social Media and Mobile Devices...................................... 295

Mobile Device Operating Systems, Apps, and Hardware ..................................... 296

Handheld Hardware ................................................................................................ 297

11.3 How Does This Affect You as IT Manager? ......................................................... 298

Lead, Encourage, and Experiment ......................................................................... 298

It’s Not the Tools, But How They Are Used......................................................... 299

Remember Your Goals ........................................................................................... 301

What Is “Focused” and What Is “Distracted”?...................................................... 301

Glossary ............................................................................................................................. 305

Index.................................................................................................................................. 317

xx Contents

Key Changes for This Edition

Technology has the shelf life of a banana.

Scott McNealy

IT ain’t what it used to be. When we starting writing the first edition of this book, large hard drives

were measured in megabytes, the “World Wide Web” was just getting started, and everyone’s phone

was tied to copper wires. If you wanted to locate a piece of information, you looked it up in a book.

And technology was the exclusive purview of IT.

Thirteen years later, portable terabyte drives are sold as consumer items. The Web is beyond per-

vasive. Phones are—well, making calls is now just an incidental feature of what they can do. Paper

books are outsold by ebooks. And terms like “IP addresses,” “Wi-Fi,” and “Bluetooth” are no longer

the jargon of just tech-heads.

MAJOR CHANGE: PRINCIPLES AND CORE CONCEPTS For these reasons, we have decided to make the third edition of this book about the principles and core concepts of the new IT Manager’s job. There are lots of recently-minted IT Managers and they still need to learn important things like how to hire (Chapter 3, Staffing Your IT Team on page 65), how to manage a project (Chapter 4, Project Management on page 103), and how to deal with users (Chapter 10, Working with Users on page 263).

IT Managers may also need to learn about converting their network to IPv6, or how to optimize a

SQL database, but they will go to other sources for that information, like the Web, or training. Or

they will go to books dedicated to very specific subjects, not to a general book like this one. The

fundamental concepts of management do not change, although technical details do—which is why we have decided not to include the technical material from the first two editions.

ANOTHER MAJOR CHANGE: CONNECTIVITY Another major change is the addition of Chapter 11, Connectivity: Social Media, Handhelds, and More on page 287. This is the fastest growing area in IT, and in addition to new hardware and soft- ware considerations, it also means new ways of thinking about IT in general.

Back in the old days (just a few years ago!) scalability was the issue, not mobility. Now most data needs to be accessed almost all the time from almost anywhere. As a consequence, discussions

about the mobile workforce are interspersed throughout the book. For many users, if it cannot be

done from a handheld device (e.g., phone or tablet), it’s not worth doing.

Regardless of the correctness of that sentiment, that is clearly the direction organizations of all

sizes are heading. And, as a new IT Manager, you should be embracing this trend. Rather than being

caught flat-footed when someone asks you about accessing sales data from a tablet device, you

xxi

should be prepared with an answer. They might not like the answer you give them, but you’ll be

much better served if you have a meaningful response ready.

Lastly, we’ve expanded the material on cloud computing to reflect the growing shift in the indus-

try to move functions (e.g., server, storage, applications) to service providers and reduce the invest-

ment in on-premise infrastructure.

We know our readers’ time is valuable, so we’ve continued to make the book easy to use with an

expanded glossary, index, and lists of sources. We’ve received positive feedback on the elements

such as the chapter-to-chapter references, a robust bibliography and index, sidebars, bulleted lists,

and pro/con tables. This edition includes enhancements of these elements as well as new examples

and updates of old ones.

“IT ain’t what it used to be,” as we said at the beginning of this section. This book is not a simple

rehash of previous material—we have striven to make the most up-to-date book about the complex

challenges today’s new IT Manager faces. We hope we have succeeded.

xxii Key Changes for This Edition

Preface

I’m a great believer in luck, and I find the harder I work the more I have of it.

Thomas Jefferson

Many technical professionals are eager to join the ranks of management. But as the saying goes,

“Be careful what you wish for.” This book introduces you to the many key concepts you will face

as a new Information Technology (IT) Manager. It also provides you with suggested methods for

dealing with many of the large issues that arise, including specific recommendations for actions as

well as places to look for further help.

We have seen many technical professionals—database administrators, programmers, desktop

technicians, server engineers—suddenly thrust into positions of management in their IT depart-

ments. Not only were they given no formal training or clear idea of what the position entailed,

they were also expected to know a great deal about a lot of different things. As senior IT profes-

sionals ourselves, we have seen this situation repeated many times. We set out to write a book that

would help new IT Managers navigate the choppy seas of management. This book aims to help

you with all those responsibilities that are suddenly thrust upon you, that you suddenly acquire,

or that you suddenly realize need to be addressed. We don’t spend much time talking about the

theory of IT management. We spend most of the book describing what you need to worry about

when you need to deal with a real-world situation, such as creating a budget or writing a job

description.

We wrote the book for new IT Managers and future IT Managers. Much of the material in this book will be familiar to experienced IT Managers. But for many individuals, recent changes in the

computer industry have brought a radical change in responsibilities with little or no help to go with

it. This book is written to help you identify, deal with, and (if necessary) tell you where to look for

further assistance on many of the key issues that are suddenly facing you as a new IT Manager. We

also recognize that one of the more difficult career steps in the field of Information Technology is

moving up from technician to manager. For those hoping to make this leap, this book can be useful

in letting you know what awaits you on the other side. By learning more about an IT Manager’s job,

you will know what skill sets to focus on so that you can demonstrate to your company that you’re

prepared and ready to be a manager.

THE STRUCTURE OF THIS BOOK We worked hard to write a book that we, as busy IT professionals, would use ourselves. We have

structured the material in easy-to-read, easy-to-grab chunks. We don’t have any free time and we

assume you don’t either. The book is designed to be scanned for critical information; it includes

many cross references with page numbers, because one topic often leads to another and because

readers want to make the jump right away. If you are reading this as an ebook, you can click on

the links and be sent there directly. You’ll also find that the book is replete with bulleted lists that

are easy to scan through to find information. We hope you find the structure and format useful

xxiii

and helpful. The book also references real-world events that are related to IT, as well as numerous

industry studies and surveys to help put a number of topics into perspective. Finally, the further

references section provides many, many books, articles, and websites that you can explore for a

deeper dive into the topics we explore.

CHAPTER-BY-CHAPTER SUMMARIES

Chapter Summary

1 The Role of an IT Manager This chapter helps a wide range of technical professionals, some of whom have been suddenly thrust into a managerial role, understand the role of an IT Manager, why it’s so important, and how integral it is to the company. It also discusses two additional key topics: the difference between leadership and management, and what happens if your company merges with another.

2 Managing Your IT Team It’s tempting to think of hardware and software as an IT Manager’s most critical IT resources, but actually the people who run, support, and manage the technologies are the most important resources you have. This chapter discusses how to keep your employees focused and trained, as well as generational issues at work that you might face. It also covers the employee evaluation process in great detail.

3 Staffing Your IT Team Hiring, and all of its aspects, is one of the important managerial responsibilities. This chapter talks about the issues and challenges you’ll face and offers some concrete ideas for solving them.

4 Project Management As an IT Manager you’ll go from one project to another; some are miniscule and others seem too big to be measured. Your success at being able to manage projects of all sizes and all degrees of complexity is a critical factor in being successful at your role. Based on the principles of classic project management, this chapter talks about topics as critical as “Five Key Phases to a Project,” “What to Do If/When the Project Gets Off Track,” and “Dealing with Non-IT Departments on a Project.”

5 Software, Operating Systems, and Enterprise Applications

These days, managing software is a much more diverse and complex job than it used to be. (Not that it was ever easy.) This chapter discusses the main classifications of software. It also talks about operating systems, open source, cloud computing, and enterprise applications.

6 Managing the Money It’s likely that the IT department has one of the largest budgets in the company. This chapter helps you get a foundation in managing a budget, spending, leasing versus buying, etc. It also offers guidance on how to make the most of your vendor relationships so that it’s beneficial to both parties. Finally, both outsourcing and offshoring are discussed in detail.

Continued

xxiv Preface

Chapter Summary

7 Getting Started with the Technical Environment

IT environments, as you probably know by now, are very complex. This chapter gives you guidance on how to get an understanding of what is in yours, and how it operates and connects to other environments. The technical environment, users, standards, technology refreshing, and the very important topic of TCO are all covered.

8 Security and Compliance Security is a 24/7/365 concern that should be an integral part of every decision you make in IT. Regulations and legislations are increasingly having a major impact on how IT departments operate. This chapter presents detailed information on compliance issues as well as information about different methodologies being adopted by various organizations to help ensure compliance.

9 Disaster Recovery With so many, and so much, depending on IT, your company may not be able to tolerate much downtime if disaster strikes. This chapter describes how to define the scope of the problem, how to create a disaster recovery plan, as well as the “The Hidden Benefits of Good Disaster Recovery Planning.”

10 Working with Users The support that you provide to your end users—regardless of where they may be—can be the most vital service you offer and the one that is the greatest influence on how you and the IT department are perceived by the rest of the company. This chapter discusses the complexities of dealing with users on another continent, and users down the hall from you using their own personal devices (tablets, smart phones, etc.) on your network. Managing the Help Desk and writing useful SLAs are also discussed.

11 Connectivity: Social Media, Handhelds, and More

This chapter discusses the challenges of the new hyper- connected workplace. What are the positives and negatives of these connections and how do they directly affect you as the IT Manager?

NOTE ON URLS AND WEB RESOURCES State-of-the-art information is critical to IT Managers and IT professionals of all kinds. Many of the

sources for this book are websites. And, as every web user understands, web content changes

quickly. We have included web addresses whenever we can, knowing full well that websites change,

material gets deleted or added, and links that worked when we wrote the book may not necessarily

work when you read it. Regardless, we thought it best to give you a reference where we found worth-

while information. You can use that information as a starting point for your search for information.

xxvPreface

Acknowledgments

Trying to condense the topic of IT management into one book isn’t an easy task. It required a deli-

cate touch to balance technical and nontechnical issues properly, as well as to determine which

topics to focus on in each area. A large portion of the ideas presented here represent what we’ve

learned from others. Accordingly, we must give credit to those who taught us (often unknowingly)

throughout the course of our careers in corporate IT—colleagues, co-workers, those we have

reported to, and those who have reported to us. We are indebted to, and grateful for, these accidental

mentors.

Portions of this material appeared in previous editions of the IT Manager’s Handbook. We would like to thank the following individuals who helped review those proposals and manuscripts and gave

guidance: Frank Calabrese, Bruce Caldwell, James Chilton, Tom Conarty, Dan Deakin, Jonathan

Ganz, Stan Gibson, Karen Godshalk, Rob Hawkins, Karen Hitchcock, Curtis Johnsey, Mark Jones,

Brian McMann, Robert Rubin, James Snyder, Norma Sutcliffe, Matt Tavis, Philip Tolley, Curt

Wennekamp, Nick Wilde, Janet Wilson.

We would also like to thank the people at Morgan Kaufmann: Rachel Roumeliotis, Andrea

Dierna, Robyn Day, and Jessica Vaughan. They took the concept for this book and ran with it,

and we are greatly indebted to their efforts. Diane Cerra, Greg Chalson, Karyn Johnson, Jennifer

Mann, Heather Scherer, Asma Stephan, and Heather Tighe were involved with the earlier editions

of the series.

Most importantly, we are tremendously indebted to our family and friends for their support and

understanding while this book was being written. It’s motivating to know that as the final edits are

being made and this self-imposed exile ends, they are anxious and eager to forget about those

declined invitations, missed dinners, and non-existent weekends. In particular:

Bill would like to thank The Five; as always, they know everything I do is for them.

Brian would like to thank Jenine—his girlfriend during the writing of the second edition, his

fiancé during the writing of the business edition, and his wife for the third edition—whom he loves

and depends on, and with whom he looks forward to the future, for her patience, love, and

encouragement.

Bill Holtsnider Denver, CO

[email protected]

Brian D. Jaffe New York, NY

[email protected]

xxvi Preface

CHAPTER

The Role of an IT Manager 1 The manager is the dynamic, life-giving element in every business.

Peter Drucker

CHAPTER TABLE OF CONTENTS

1.1 Just What Does an IT Manager Do?.....................................................................................................2

1.2 Managers in General .........................................................................................................................3

1.3 The Strategic Value of the IT Department............................................................................................8

1.4 Developing an IT Strategy ................................................................................................................10

1.5 Leadership versus Management .......................................................................................................13

1.6 Starting Your New Job .....................................................................................................................14

1.7 The First 100 Days ..........................................................................................................................20

1.8 Two IT Departments—What Happens if Your Company Merges with Another?......................................27

1.9 Further References ..........................................................................................................................28

Common issues and questions about IT Managers include:

• What does an IT Manager actually do? • Did you recently receive a promotion into that job with no prior training?

• Are you glad you got the job?

• Do you eventually want to become one?

Before we help you answer those questions, we discuss the definition and the pros and cons of being a

manager. Clearly management as a career path is well suited for some people, but not for everyone. Is it

right for you?

IT Managers need to wear a lot of hats. Different parts of the organization will have different

expectations of this position, and you’ll have to address them all. Finance expects you to manage costs.

Sales and Marketing will want to see IT help generate revenue. The auditors are looking over your

shoulder. Your staff is looking for guidance, career development, and a work-life balance. The exec-

utive traveling to Dubai wants to know if his cell phone will work there, and how to use the hotel’s

Wi-Fi. And the administrative assistant down the hall just wants her printer to stop smudging. This

chapter examines the varied roles and responsibilities of an IT Manager.

IT Manager’s Handbook.

© 2012 William Holtsnider & Brian D. Jaffe. Published by Elsevier, Inc. All rights reserved. 1

1.1 JUST WHAT DOES AN IT MANAGER DO? IT Managers now have many responsibilities (data centers, staff management, telecommunications,

servers, applications, workstations, websites, mobile access and devices, user support, regulatory

compliance, vendor management, disaster recovery, etc.) and work with all the departments (account-

ing, human resources, marketing, sales, distribution, facilities, legal, etc.) within a company or

organization.

This is both the good and the bad news. At some companies, an IT Manager can have direct influ- ence on the strategic direction of the company, suggesting and helping implement web initiatives,

for example. In other companies, an IT Manager is really only a technician, software developer, or

network engineer. And to complicate things even further, those definitions change quickly over time.

Yesterday’s network engineer might become today’s website consultant.

Why All That Change and Flexibility Is Good The position of ITManager can be very challenging. It is extremely varied in scope, allows you to come

in contact with a large portion of your company, provides you with opportunities to directly affect

the overall direction of your organization, and is very valuable professional experience to acquire.

In addition, you get to increase your range of experience; you are forced to (and get to) keep up with the latest changes in technology (so your skill set will always be in demand) and your network of

contacts gets large.

As important as all that is, there is an added bonus: In recent years, IT has taken on a strategic value

in the roles companies play in the new economy. Information Technology is now a critical component

of many companies and the U.S. economy. In the 2010–2011Occupational Outlook Handbook released

by the U.S. Department of Labor’s Bureau of Labor Statistics, “computer and mathematical science

occupations . . . are expected to grow more than twice as fast as the average for all occupations in the economy . . . driven by the continuing need for businesses, government agencies, and other organizations to adopt and utilize the latest technologies.”

And for IT Managers, the report says, “faster than average employment growth is expected . . . [and] job prospects should be excellent.” Specifically the report projects employment of computer

and information systems managers to grow 17 percent over the 2008–2018 decade, which is faster than

the average for all occupations. New uses for “technology in the workplace will continue to drive

demand for workers, fueling the need formoremanagers.” Not only is your job interesting and rewarding,

it is also very important and increasingly in demand. Dependence on technology is only growing, and

issues such as security, revenue generation, improved productivity, and compliance are making IT

more visible throughout the organization. What more could you ask for?

Why All That Change and Flexibility Is Bad However, being an IT Manager is a difficult, often thankless, task. Like many service jobs, if you do it

superbly, most people do not notice. Mess up and they scream. In addition, responsibilities of the job

differ radically from company to company. Some companies actually have many IT Managers and

several layers of management. At others (although this number is shrinking) an IT Manager is a

part-time role someone fills while doing their “real” job.

2 CHAPTER 1 The Role of an IT Manager

In addition, the role of an IT Manager can often vary widely within the same organization, depend-

ing on who is making the decisions at the time. The “Western Region Sales Manager” knows what his

role is—get more sales as soon as possible in a specific area—and that is not going to vary much from

company to company. An IT Manager, however, can mean many things to many people, and the job

changes as technology and needs advance and evolve.

Addressing all these needs and people canmean that time for “extras” such as sleep andmeals have to

be sacrificed. As a manager, everyone else’s crises become yours. People (your users, your management,

your staff, etc.) demand quick resolutions to problems and look to you to fix them. In this book,we discuss

in detail the positive and negative elements of the key components of being an ITManager. If a process is

litteredwith political landmines (budgeting, for example), we’ll warn you about it; if a process has hidden

perks (being an unofficial project manager for a project can put you in contact withmany different people

at many different layers of the organization), we’ll tell you that, too. But before you decide if you should

be an IT Manager, read the next section to determine if you want to be a manager at all.

1.2 MANAGERS IN GENERAL Before you decide whether you want to become an ITManager, you should decide whether you want to

become a manager at all. One method of evaluating a potential career is to read books or take intro-

ductory classes about how to do it; sometimes, reading a book about a subject will make you realize you

do not want to pursue that particular career (see Table 1.1). Like most topics in this book, we present you with both the positive and the negative aspects of

being a manager. We share our experiences and those of other managers we know; managers with over

100 years of combined experience contributed ideas to the following section.

Of course, the comments in this section are extremely subjective. Both positive and negative com-

ments about such a broad topic (“management”) are bound to be generalizations that can easily be

counter-argued. So take each comment, idea, and suggestion as something to be considered, evaluated,

and adapted; perhaps it applies to your experience and perhaps not.

Definition of a Manager Management has been defined as “assembling the resources to achieve a mutually agreed upon objec-

tive” (G. Puziak, 2005) or as “getting things done through other people” (AMA President, 1980).

A more mundane dictionary definition is the “authoritative control over the affairs of others.” All three

views are commonly held beliefs.

Note the radical difference between the definitions: the first two have a sense of collaboration

(“mutually agreed upon” and “through”), whereas the last one defines management as “control.”

As always, flexibility is the key.

Styles of Management These definitions reflect the two typical management structures American companies now employ:

• Command and Control

• Collaboration

31.2 Managers in general

These styles have many different names: “authoritarian” and “participative,” or “military” and “worker

responsibility.”

Few companies, or individuals, are either purely one type or another, of course, but most are

generally one kind or another. To succeed as a manager, it’s best if you determine which type of management your company embraces. Also, determine which type of manager you want to become.

Regardless of your answer, being flexible and adaptable will be a critical factor.While one type of style

may work well in one situation, a different set of circumstances could call for an entirely different

approach.

Command and Control Based on classic military structure, this style was popular for much of American corporate history. You

direct your employees and your boss directs you. In its extreme, this style doesn’t allow for disagree-

ment or input from subordinates. It emphasizes clear commands, and rewards those that follow these

commands virtually without question.

This style has lost popularity and is most familiar to the older generations (see the section

“Generational Issues at Work” in Chapter 2, Managing Your IT Team, on page 57). While some environments still operate under this style, many corporations are revisiting their commitment to such a

rigid method of management. While execution of tasks under command and control systems is often

faster and costs less, it also often leads to poor decisions and less-than-ideal results, and ends up costing

more over the long term. In addition, employees under this system are often unhappy because they

exercise little control in their jobs. It is also hard to know what value is lost in an environment where

collaboration and teamwork are absent and discouraged.

Collaboration This style of management has been growing in popularity and use for the past few decades. In a col-

laborative environment, all levels of the corporate organization are actively involved in the execution

of business. It doesn’t necessarily mean dock workers make decisions on plant relocations (although

assembly-line workers are now much more involved in decisions that affect them than they ever have

been). But it does mean that many workers who are affected or who can contribute to decisions are now

asked to be involved—regardless of where they stand in the company hierarchy.

The goals of collaboration are better and more cost-effective decisions because the people affected

by those decisions are involved in making them, with a very significant added benefit of increased

personal satisfaction for workers. The negatives are summarized by that old adage “paralysis by

analysis.” When this happens, too many people involved in a decision don’t make the decision and

it bogs down.

Within the collaboration mode, there are also two extremes: managers whomicromanage—they are

involved in every decision and consult as many people as possible on even the smallest of issues—and

managers who are so distant they provide no guidance or feedback to their team and ignore even the

most pressing of issues.

In some companies, the collaborative culture has been fully embraced at the highest levels of the

organization. Andy Grove, former CEO of Intel; Michael Bloomberg, Mayor of New York City; and

Mark Zuckerberg, cofounder and CEO of Facebook chose to work at desks in open environments, as

opposed to the traditional executive perk of having their own executive office.

4 CHAPTER 1 The Role of an IT Manager

What Kind of Manager Will You Be? It’s hard to predict, but study the two types ofmanagement styles discussed above.Which kind have you

experienced as a staffmember?Which kind did you like?What kind of style is common in your company?

“Management style shock” is not uncommon; a manager comes from another company and, bringing

her management toolbox with her, quickly discovers that her “style” and that of the new company rad-

ically conflict. She is used to a collaborative approach and this company has no patience for discussion;

her bosses dictate what she should do and they expect her to do the same. Or, she starts commanding her

staff around and they, used to group meetings to make important decisions, are shocked.

In a survey about senior management terminations released in 2009 by the Korn/Ferry Institute , it

was found that a leading reason for termination “is difficulty with relationships in the organization,

much more frequently cited than purely performance-related issues.” Furthermore, the report stated

“that 50 percent of performance at the CEO level is determined not by one’s experience or technical

abilities but by leadership characteristics. Leadership characteristics encompass areas such as personal

and interpersonal skills, being organizationally savvy and [having] integrity” (source: www .kornferryinstitute.com/files/pdf1/KFceo_whtppr_jan30.pdf). Of course, this book isn’t about suc- ceeding as a CEO, but there is certainly a lesson here that individuals from all parts of the organization

can appreciate and learn from.

Pros and Cons of Being a Manager: Reasons to Become a Manager, and Reasons Not to Become One

Table 1.1 Pros and Cons of Being a Manager

PRO CON

May have more control over your life. You can delegate to others instead of being a resource of one. Of course, you will probably also have a manager above you.

May have less control over your life (since the problems of others now become your problems).

Typically make more money than those in nonmanagement roles, although this, too, is changing. There are technical tracks in many companies that are almost as lucrative as management, but not every company has this option.

Typically, but not always, a manager has more responsibility than a non-manager. There is more credit if things go right and a bigger price to pay if things go wrong.

Do work on a larger scale. A simplistic example might be: one non-management worker may generate $1000 a day in revenue for the company, but a manager may manage six such workers, generating $6000 daily for the company.

Management looks and sounds a lot easier than it is. Often, managers are seen attending endless meetings or just having casual conversations all the time—not doing “real work.” In fact, they often carry a great deal of responsibility and have to make difficult decisions routinely.

Have greater potential to “make a difference.” Numerous headaches come with managing people: meeting your project’s budget and schedule projections, dealing with challenging employees, and administrative annoyances. (“Those 200 new PCs arrived, where do we store them until we’re ready to work on them?”)

Continued

51.2 Managers in general

The Hidden Work of Management One challenging aspect of management is that the actual work done is often less apparent and less

tangible than the work being done by subordinates.

Management Is Sometimes Hard to See There are, of course, examples of useless and lazy managers. You may even be a victim of one. But

management is not, in and of itself, easy. Nor are all of its components visible. A worker may see a

manager spend several hours a day in meetings: “That guy just spends his days in meetings, and doesn’t

do any ‘real’ work.” But the truth is probably quite different: The manager may be attending those

meetings with fellow managers and performing some of the tasks discussed in this book: reviewing

resources, discussing personnel matters, proposing or defending a budget, setting objectives and strat-

egies, fighting with Human Resources (HR) and Finance about planned layoffs, or planning a system

overhaul. In that scenario, a hard-working manager and a slouch look exactly the same to an outside

observer.

Good and Bad Management Often Look Alike—For a While In addition, because great—or even good—management is often hard to see, the effects of good man-

agement are sometimes clear only in retrospect. Consequently, bad management and good manage-

ment can look the same until the outcomes are seen. A manager that has a critical meeting with a

subordinate that gets that subordinate back on track looks, to the outside observer, exactly like a man-

ager having an intense conversation with a coworker about weekend party plans. That worker’s new

attitude may take weeks, or months, to show itself concretely. A key decision not to pursue opening a

new plant overseas happens in meeting rooms far from the general employee population; it may cost

hundreds of jobs in the short term, but save thousands in the long term. Those results will show up in the

financial results years after the decision was made.

Table 1.1 Pros and Cons of Being a Manager—Cont’d

PRO CON

You get the credit for all the good work that your team does on your watch . . . whether it happened because of you, your staff, or by random chance.

You get the blame for all the bad stuff that happens on your watch. . .whether it happened because of you, your staff, or by random chance.

Get the opportunity to develop non-IT skills, working with other departments, vendors, partners, etc.

There are tough decisions to make: budget cuts, employee performance, having to choose between Jenine and Peter for the promotion, etc.

Have the opportunity to determine strategy and to set direction for both a department and the company as a whole.

Acquire the ability to add more value to a department and a company.

Have the opportunity to develop, coach, and mentor other people.

6 CHAPTER 1 The Role of an IT Manager

Resentment toward Management If you become a manager, you can assume there may be some resentment toward you in that role. This

resentment could be because others in the department had hoped that they would get the job or somemay

think that you’re not qualified. There are also challengeswhen you are promoted and now have tomanage

a group of people that used to be your peers. There can be a tendency for tension between non-managerial

staff and managers: The role of one is to direct, steer, or manage the other. Most of the time, that rela-

tionship works well and each person knows her own role and understands the other’s role to some degree.

Occasionally, however, that tension needs time and attention by both sides before it disappears.

The key to dealing with this problem is to communicate. Talk with your staff. Build a relationship

with each member of your team. Let each person know you recognize their talents and their contributions.

Babysitting versus Managing There is a portion of any manager’s job that is “just babysitting.” People are unpredictable, but you can

predict they aren’t always going to act in ways that will help you and your department. Sometimes their

actionswill cause you a great deal of stress; anyonewho has had to lay off employeeswill attest to the pain

of delivering a pink slip. Some of your staff will do exactly as you request, which may mean they sit idle

until you request something. Others are so eager to domore that you have to hold them back. Other times

employees will drive you crazy with items so mundane you’ll scarcely believe you are talking about the

issue. Manymanagers know of the enormous “turf wars” that erupt over inches of desk size, who gets the

larger monitor, or who is allowed to go to which training classes. Hence the name “babysitting.”

Politics Unlike non-managerial workers, many managers spend a large amount of time dealing with the polit-

ical elements of the company. While some people dislike any form of politics at work, many others

thrive on it. “Politics at work” can mean anything from jockeying for a larger role in an upcoming

project to turf wars about who manages which department.

Some politics is necessary: the network support team needs someone to run it, and either a new

person has to be hired (see Chapter 3, Staffing Your IT Team on page 65) or a current employee needs to be appointed. Since people are only human, some subjective considerations will eventually

come into play. Does John in Accounting have the right personality for the job? If Mary is given that

promotion, will she eventually merge the department with her old one? If Tom is hired, will he want to

bring along his friend Chris that he always seems to have working for him?

Managing in Four Directions Chapter 2, Managing Your IT Team on page 31, is dedicated to the issues of managing your staff. However, it is important to note that most managers have to manage in four directions (see Figure 1.1).

Although managing your team is probably the most vital of these four and will consume a good portion

of your time and energy, you cannot ignore the other three.

• Managing up: This includes your boss and other company management. • Managing your peers:Your peers include people at the same level as you within the organization.

This can be other managers in the IT department, as well as managers in other departments.

71.2 Managers in general

• Managing your users/customers/clients: These are the people to whom you deliver your services. They could be users calling your Help Desk, customers using the company website, employees

accessing e-mail or file-servers, or partners you exchange data with. • Managing your staff: These are the individuals (employees, consultants, even vendor representa-

tives) in the organization that report into you.

In all four of these directions, you’re dealing with similar issues: setting expectations, developing

relationships, aligning goals and strategies, demonstrating leadership as well as management, and

so on. However, each of them has a different twist, too. For example, you set expectations differently

when you manage up than when you are managing your staff. In the former, you’re helping set a frame

of reference for your management as to what they should expect, from you, from technology, and from

your team. You are also outlining what you’ll need from them (support, resources, etc.). When you set

expectations for your staff, you are defining objectives for them, and holding them accountable. Sim-

ilarly, aligning goals is something you would do in all four directions, but you would do them with a

different approach and at different levels with each direction.

1.3 THE STRATEGIC VALUE OF THE IT DEPARTMENT IT has become one of the most critical functions in the economy of the new century. As corporations

have embraced the efficiencies and excitement of the new digital economy, IT and IT professionals

have grown dramatically in value. IT is no longer “just” a department, no longer an isolated island like

the MIS departments of old corporations where requests for data would flow in and emerge, weeks or

Managing in 4 directions

Boss, company management

Peers in IT and other departments

Staff

Users, customers, clients, partners and suppliers

FIGURE 1.1

Managing in four directions.

8 CHAPTER 1 The Role of an IT Manager

months later, in some long, unreadable report. Many companies now make IT an integral part of their

company, of their mission statements, and of their spending. Your role is more critical than ever before.

THE CEO’S ROLE IN IT

First, the CEO must be sure to regard information technology as a strategic resource to help the business get more out of its people. Second, the CEO must learn enough about technology to be able to ask good, hard questions of the CIO and be able to tell whether good answers are coming back. Third, the CEO needs to bring the CIO into management’s deliberations and strategizing. It’s impossible to align IT strategy with business strategy if the CIO is out of the business loop.

—Bill Gates Business @ the Speed of Thought

Application Development versus Technical Operations Most IT organizations have two primary functional areas: Applications Development and Technical

Operations.

Application Development Companies often see the real value of IT as only the applications that serve the company’s core busi-

ness. Applications are what allow one business to become innovative, more efficient, and more pro-

ductive and set itself apart from its competitors. Careers within applications development include

analysts, programmers, database administrators, interface designers, and testers, among others.

Many people within IT like working in application development because it allows them to learn

how the business operates. As a result, it may often provide opportunities for increased involvement

with people in other departments outside of IT. However, many programmers find the job is too iso-

lating because their daily interactions may only be with the program logic displayed on their screen and

the keyboard; they don’t like being only “keyboard jockeys.” Of course, other programmers welcome

the isolation and embrace the opportunity to work in relative seclusion.

Technical Operations The technical support function is the oft-forgotten area of IT. The Technical Operations organization is

responsible for making sure that the computers are up and operating as they should. Their jobs go well

beyond the computer hardware and include the network (routers, switches, telecommunication facil-

ities, etc.), data center, operations, security, backups, operating systems, and so on. The Help Desk may

be the most visible portion of the Technical Operations group. Within the industry, this infrastructure

side of IT is often referred to as the “plumbing.” Like most important and underappreciated jobs, when

Operations is doing their job well you don’t even know they exist. But if something goes wrong, their

visibility within the organization suddenly skyrockets.

However, those working in Operations may find the time demands stressful. Some system main-

tenance can be done only during weekends and evenings when users won’t be affected. Similarly, it will

be the Operations staff that is roused by a mid-REM-sleep phone call when the system crashes in the

middle of the night. (For a discussion of methods of preventing burnout, see Chapter 2, Managing Your IT Team on page 31.)

91.3 The strategic value of the IT department

IT Department Goals One of your objectives as an involved and caring manager is to make sure that your department’s goals

are in line with those of your organization. It doesn’t matter if you’re an IT Manager for a small non-

profit or a midlevel manager for a Fortune 500 company, you need to discover what the organization’s

goals are and make them your own.

If you work for a corporate organization, your IT goals may be measured in the same terms as the

business areas that you support—reduce per-unit costs of the division’s products and increase the

capacity and throughput of the business and manufacturing processes, for example. Your tactics must

clearly satisfy these goals. If you work in a nonprofit or educational organization, your goals—and the

way you are measured—will be different. Your boss should be clear about communicating those goals

to you—they shouldn’t be a secret.

The Value of IT Managers IT is a complex, misunderstood part of many of today’s organizations. Executives now know how to

use Word, Excel, e-mail, their smart phones, and how to mine the Web for information, but some have

little or no understanding of the deeper, more complex issues involved in IT. They imagine IT to be a

powerful but multifaceted world where rewards can be magically great and risks are frighteningly ter-

rible. These executives and their corporations need professionals to both explain and execute in this

world. This is where you come in.

You can leverage your technical knowledge, experience, and interests with your company’s direct

profit and loss requirements. Together, you and your company can provide a powerful business com- bination. Alone, your individual skills and passions can wither into arcane interests, and your business expertise can build models relevant to an economic world decades in the past.

• Will your technical expertise and recommendations occasionally clash with the company’s needs

and vision? Absolutely.

• Will your ideas about technical directions sometimes be in direct opposition to others’ perceptions

of “market forces”? Absolutely.

• Will you “win some and lose some”? Absolutely.

The purpose of this book, however, is to help you succeed—and to help your company succeed. We

want you, your IT department, and your company to work together as successfully as possible.

1.4 DEVELOPING AN IT STRATEGY The cosmic question “Why are we here?” applies to corporate departments as well. It is entirely possible

that many, if not all, of your staff don’t have the full understanding of how the IT department serves the

entire organization. When it comes to their job, they may understand what’s critical for today. But, although today is important, it’s also vital to know about tomorrow and beyond. If they’re only looking

at the trees, you have to be the one to let them know about the forest. The strategy should include feed-

back from your employees and should be cleared by your boss, but you should drive its formulation.

Without an IT strategy, you won’t be able to align your long-term goals with your short-term

responsibilities. You need to have these items decided and written down so that when your boss tells

10 CHAPTER 1 The Role of an IT Manager

you to do X, your employee needs Y, and the other manager down the hall that helped you last week

needs Z, you have a clear idea of which task should be addressed in which order.

Some companies have huge IT departments, with layers and layers of managers. Organizations of

this size have formal IT strategies and sub-strategies. However, many smaller companies don’t have

formal IT departments with managers, budgets, and expectations. Wherever you are on the size and

formal structure spectrum, you should have a strategy. And you should write it down. Your strategy

should include the following:

• Who are your team members and what can they do? • Why or how is technology important to your organization? • What are your assets?

• Who are your customers?

• What are your customers’ needs?

• How do you plan to satisfy these needs?

Although this all sounds simple, it’s definitely not. Your customers may not even know what their

IT needs are, for example. However, the very act of getting this in writing can be of great value.

For more information on both the visible and the hidden benefits of documentation, see Chapter 8, Security and Compliance on page 205.

Determine Who Your Team Members Are This also seems like a simple task—just list the people in your department. In fact, though, your team

members may or may not be all the people on your staff. You may have someone on your staff who has

part-time responsibilities to another department. This person is on your team, but you can’t count on

having his or her time when you need it.

Alternatively, there may be people from other departments who aren’t on your payroll and report to

some other branch of the organizational chart, but could be very useful to your department. They might

call you when they hear about certain problems on the system, for example, or help you when someone

in your department is out sick. They may have intimate knowledge of the business applications and

could be in a better position than your team to do testing, understand the impact of changes, and

how the application is used. These people aren’t in your budget and aren’t in your department, but they

are on your team. See Chapter 4, Project Management on page 103 for a discussion of how to work with, recruit, and “manage” people who are not directly under your supervision.

In addition to determining who the teammembers are, find out their skill sets and backgrounds. You

may know a team member as a cable installer but he may have rudimentary .NET skills that the

Applications Development team could use. She may be a sales manager who has some project

management experience that could help you coordinate new phone system rollout.

Determine How Important Technology Is to Your Organization The technology in use can vary tremendously from organization to organization. Originally, in a law

firm, technology was used simply for word processing or for tracking client billings. Additionally, it

could be used to scan and archive documents so that every single piece of paper related to a case is

online where it can be indexed, cross-referenced, and immediately retrieved. But now, law firms

111.4 Developing an IT strategy

are increasingly involved in technology through e-discovery, digital forensics, and lawsuits related to

use of technology. In a retail organization, technology can be used for all the traditional back office

activities (billing, purchasing, etc.) but probably serves its most vital function by helping the store man-

agers know what products are generating the most sales and profits and which should be dropped from

inventory. The store might also use it for space planning so that the shelves are stocked in a way that

maximizes space usage, as well as sales and profitability. Customer lists and purchase history can be

used to create customized marketing campaigns and increase sales.

Determine Who Your Customers Are and What Their Needs Are Whether your customers are other employees, suppliers, consumers, or other businesses, they are the

ones you need to serve. Find out who your customers are. Figure out what their needs are. Then spend

your time addressing those needs. Issues to consider include the following:

• Your customers are not necessarily retail customers (although they could be).More likely, your customers are other internal departments in the company and your boss. Different jobs have differ-

ent customers, and there are departments (such as Sales and Marketing) who should spend all day

figuring out what their external customers need. IT, however, commonly serves other departments

within the company, such as sales, marketing, accounting, and management. • Figure out what your customers’ needs are.Are they products or services? Data and information?

Reduced costs? Mobile services? Improved efficiency or productivity? • Ask your customers directly about their needs. Set up meetings with representatives from dif-

ferent departments, ask questions, note the answers, and change the way you’re doing business to

reflect your customer needs and concerns.

Keep Your Department Central to the Company’s Operations Make sure the strategymentioned in the previous section is carefully aligned with the goals of the entire

organization. This is critical. If the needs of your immediate boss are out of alignment with what the

entire company is doing, you have a serious problem. (See the section “Company Mission, Vision, and Values” in Chapter 2, Managing Your IT Team, on page 34 about the company’s mission.)

Let the rest of the organization know what you’re doing in IT. To many of the other department

managers, IT may not mean much more than “the people at the Help Desk who can reset passwords.”

Periodically, have a meeting with the other department heads. Let them know what you’re doing in IT,

what you’ve accomplished, and what you plan to do. With a little luck, light bulbs will start going off.

They may see uses for the technology that you hadn’t thought of. Get some good discussion going and

you may learn a way to deliver a lot more value by modifying your plans slightly. See the section

“Sharing Information” in Chapter 10, Working with Users, on page 266. The reality is that in today’s corporate world, IT departments are by default in the middle of action.

Everyone is aware of the values that computerization can bring to an enterprise. Wineries, toy shops,

bookstores, and sandwich places now have sophisticated computerized inventory systems, customer

service mechanisms, online ordering components, and pay by mobile phone capabilities. Information

technology is everywhere. (For a more detailed discussion of this complex issue, see the section

“Consumerization of IT” in Chapter 10, Working with Users on page 271 and Chapter 11, Connectivity: Social Media, Handhelds, and More on page 287.)

12 CHAPTER 1 The Role of an IT Manager

1.5 LEADERSHIP VERSUS MANAGEMENT Before you became a manager, the word “management” was probably the focus of your career path.

Now that you’re a manager, “leadership” should be in your sights.

If you do a search on “leadership vs. management” you’ll find lots of definitions and examples.

However, the common theme is that a manager is generally focused on daily operations and meeting

deadlines and budgets, whereas a leader is more of a visionary and strategic planner, someone who

can transform an organization, who inspires and motivates. From another perspective, managers are

focused on the short term, whereas leaders are focused on the long term. Table 1.2 describes the differences between leadership and management, and has been highly regarded as the definitive

comparison for years

Of course, leadership and management are not mutually exclusive. Managers frequently have to

show leadership in their roles, and leaders must have some management skills to ensure that their vi-

sions are realized. While there is an incredible volume of resources to help people become leaders,

there are those for whom leadership comes naturally. Even at an early age some people show great

capacity for leadership. Think about your own childhood: In all likelihood one of your friends (possibly

even you) was the one the others followed (sometimes into trouble) and looked to—perhaps to decide

how to spend a free day, resolve a dispute, or find the way out of a jam.

Table 1.2 Comparing Leadership and Management

Management Leadership

Creating an agenda

Planning and budgeting—establishing detailed steps and timetables for achieving needed results and then allocating the resources necessary to make that happen

Establishing direction—developing a vision of the future, often the distant future, and strategies for producing the changes needed to achieve that vision

Developing a network for achieving the goals

Organizing and staffing—establishing some structure for accomplishing plan requirements, staffing that structure with individuals, delegating responsibility and authority for carrying out the plan, providing policies and procedures to help guide people, and creating methods or systems to monitor implementation

Aligning people—communicating the direction by words and deeds to all those whose cooperation may be needed so as to influence the creation of teams and coalitions that understand the vision and strategies, and accept their validity

Execution Controlling and problem solving— monitoring results vs. plan in some detail, identifying deviations, and then planning and organizing to solve these problems

Motivating and inspiring—energizing people to overcome major political, bureaucratic, and resource barriers to change by satisfying very basic, but often unfulfilled, human needs

Outcomes Produces a degree of predictability and order and has the potential of consistently producing key results expected by various stakeholders (e.g., for customers—always being on time; for stockholders—being on budget)

Produces change, often to a dramatic degree, and has the potential of producing extremely useful change (e.g., new products that customers want, new approaches to labor relations that help make a firm more competitive)

Source: Kotter, John P., A Force for Change, Free Press, 1990.

131.5 Leadership versus management

1.6 STARTING YOUR NEW JOB Taking on new responsibility is always a little scary, but if your company promotes you to a manager’s

role, you can take comfort in the familiar surroundings. You know the staff, you know the organization,

you know the technical environment, and you know how things operate. Nonetheless, you have new

sets of responsibilities, new expectations, and your relationships with others will change.

Changing companies and changing jobs, though, is a whole different animal. It immerses you in unfamiliar surroundings. Aside from the people who interviewed you, the only familiar things may

be the technology products being used (and even some of those may not be too familiar).

As you first get settled, your boss will be looking for signs to confirm to him that he promoted or

hired the right person. And you’ll be trying to determine if you made the right decision in your career

path. Whether your new job is at a new company or not, it’s vital to start things properly.

The First Day Even if you went through an extensive interview process, you probably spent less than eight hours talking

with people at your new company, and most of that time was spent for them to learn about you. There was only a limited opportunity for you to learn about them. You’re hoping that your gut instinct about the company and its people have led you to the right choice. Your boss is hoping that the person he met

on the interview, and to whom he extended the offer, is the same person who shows up for work.

Don’t be nervous. The first day in a new position isn’t all that different from the first day at a new

school and trying to figure out the lay of the land. (Remember the tension of those days?) You’ve got

every reason to be nervous, but keep it to yourself. You want to demonstrate confidence. In fact, in a

manner not too different from the interview, you want to show a combination of confidence (but not

cockiness), and experience (but not a know-it-all attitude), enthusiasm (but not giddiness). And, a little

humility in showing that you don’t know everything, and welcoming help from others can go a long

way. In short, it’s a good idea to try and maintain your interview persona, perhaps relaxed just a notch,

when you first start a new job. And remember, you won’t be the only one who is a little nervous. Your

staff is probably just as uneasy about getting a new boss.

Meeting the Staff Unless you were told otherwise, it’s probably safe to assume that your staff is like many other IT staffs

with a healthy cross-section of technically brilliant people, socially challenged people, hard-working

people, under-performers, and various combinations in between. To make things more complicated,

your boss (demonstrating his professionalism) didn’t give you his thoughts on individuals because

he thought you should form your own opinions . . . and he’s right. Unless it was made clear to you at the outset that your staff is a serious problem, you can probably

assume that you have not been hired just to “kick some butts,” although you may determine later that

some kicking is called for. Most likely you were hired to demonstrate leadership, professional maturity,

management, and to provide direction.

On that first day, you’ll be introduced to everyone, and in short order you’ll forget their names, their

faces, what they do, and where they sit. That’s okay, that’s normal. Hopefully, you were provided with

the department’s organizational chart; it can be a handymap to help you become familiar with your new

surroundings.

14 CHAPTER 1 The Role of an IT Manager

If your new role is a promotion at your company, you’ll be starting off with your own ideas about

the staff. There may be some colleagues who you always thought were underappreciated and those that

you thought should’ve been let go years ago. However, instead of having those thoughts as a mere

coworker, you’ll now be in a position of authority to act on those thoughts. Also, you may find that

you look at the world differently (and it looks at you differently)—through the lens of management.

Those first days will give you a chance to talk to your staff, perhaps as a group. They’ll be judging

what you say and how you say it.

A Few Ideas for What to Say to Break the Ice Whether these are people you’ve worked with for years or you’re just meeting them for the first time,

here are a few things you might bring up in that first meeting:

• A little bit about your background (last company and position you held, areas of IT you’ve worked

in, different industries you’ve worked in) • Some recent projects the group has completed (hopefully, if you’ve changed companies, you got

this information from your new boss) • Upcoming projects and challenges facing the group (again, information your new boss provided)

• What goals you have, and what areas are important to you (e.g., customer service, reliability of

systems, documentation, etc.)

• Why you’re excited to be part of this company, and your new role

• “My door is always open” (although don’t say this if it isn’t true)

Use these as a way to let them get a sense of who you are and what type of manager they can expect.

Some Don’ts As much as you want to get those first days off to a good start, you also want to avoid doing anything

that leaves a bad taste in anyone’s mouth:

• Don’t talk too much about yourself and your accomplishments. You’re not trying to impress them,

just give them a sense of who you are. • Don’t try to make them afraid of you or to make them love you. You want their respect. • Don’t say things you’re not reasonably certain you can do. For example, don’t say you want to get

everyone trained and then discover that you have virtually no training budget.

Be careful, but don’t stress too much over this. You only have to look at the news to see that everyone

from celebrities, business executives, and politicians has had their share of gaffes and putting their foot

in their mouth.

One-on-One Meetings More important than the small talk when you get started, however, is having one-on-one meetings with

your staff. Even if you have a very large organization that has several layers below you, you should try

to meet everyone on your staff. You’ll benefit from hearing everyone’s perspective, and they’ll be

pleased that you took the time and effort to talk to them. In many cases, the act of simply having a

chat can be of more value than anything specific that’s discussed.

151.6 Starting your new job

Even if they are people you’ve worked with for years, a chat like this is very worthwhile. It’ll be the

first time you will have a discussion with them as the new boss. It will help set the tone of the rela-

tionship going forward and can be a strong foundation for it.

Of course, some of those one-on-ones may prove to be challenging. Your direct reports are probably

seasoned enough to have a “conversation.” However, those from the lower ranks may be uncomfort-

able, scared, or just not great at holding a business conversation with the big boss (especially one they

just met). Then again, some may really bend your ear.

If warranted, especially if you have a large team, you may want to meet some of the lower level staff

in small groups. This may dilute the pressure that some of the quieter ones may feel.

Some Topics to Get the Conversational Ball Rolling • How long have you been working here?

• Where were you before?

• What do you like best/least?

• What projects are you currently on, and what’s your involvement?

• What are the best and worst things about the department/company? • What’s your function? Have you always been doing that? • What areas, projects, or type of work would you like to get involved with? • What do you think of the department?

• What needs to get done?

• Is there anything you’d like to ask me or tell me?

• What are your concerns?

• What are the areas that you think need improving?

• Do you have any ideas for those improvements? • Do you have any advice for me?

The last question may elicit some surprise that you asked for advice, and you may be surprised by some

of the things that you hear. But it will probably buy you some goodwill as it’s an indirect way of saying

that you don’t have all the answers and that you are eager for other people’s input and help. Since no

one is going to expect you to remember everything, it’s okay to take notes during these conversations.

Not only will the notes help you later when you’re trying to remember who said what, but it shows the

staff that you care enough about what they say to write it down.

Remember to treat everyone with respect and professionalism.

What to Say to Those Who Wanted Your Job and Didn’t Get It It’s almost certain that someone on your staff (maybe even a peer) wanted your job—some may have

even actively campaigned for it. For those who didn’t get the job, they may not have really wanted it

(and just applied as an opportunity to gain some visibility and face time with decision makers) and may

even feel relieved they didn’t get it. For others, though, the emotions may still be strong.

Unfortunately, you may not learn until later who wanted your job, why they were denied the

opportunity, and, most important, what (and how) they were told about why they didn’t get it. In a

worst-case scenario, they only learned that they didn’t get it when they heard you were showing up

to take that spot.

16 CHAPTER 1 The Role of an IT Manager

If you do know who applied for your job, you probably are better off not mentioning it to them

directly. They may feel like you’re rubbing salt in the wound. Also, even if you try to be sensitive,

they may resent the sympathetic posture from the person who took the job they wanted—you certainly

don’t want to appear condescending or patronizing.

The emotions from these individuals can be a combination of resentment, depression, disappoint-

ment, and indifference. The best thing you can do is to treat everyone equally with respect and pro-

fessionalism. Over time, they’ll come to terms with their disappointment and focus on their jobs. If

they don’t, that will be a signal that it’s time for a heart-to-heart conversation with them. This conver-

sation doesn’t need to be any different from any conversation a manager may need to have with

an employee demonstrating performance or outlook problems, which are discussed in the section

“Disciplinary Problems and Terminations” in Chapter 2, Managing Your IT Team, on page 54. There is also a chance, hopefully very small, that one of the individuals may be so bitter that they are

actually working against you. The smart person, although disappointed, should realize that their best approach is to align themselves with you so that they become your indispensable right-hand person.

Invariably, anyone who tries to sabotage their new manager will end up losing in a number of ways:

• Squandering the opportunity to look good to the new manager • Losing the confidence and trust of the new manager • Showing that they aren’t a team player

In some cases, one of these individuals may have been unofficially filling your role while the position

was vacant. It might be a very good move for you to allow them to continue doing some of the tasks that

they had taken on—running some meetings, leading some projects, etc. If you let them know that you

respect and value what they do, that you want to work with them, and that you’re not going to take

things away from them just because you’re the new big boss, you’ll be sending a very strong message

about the type of person you are.

How you deal with individuals and individual circumstances is often a tough judgment call. But

exercising judgment is pretty much what your job is about. How you deal with people who applied

for the job you have now might be one of your first big challenges, and one of your first big oppor-

tunities, as a new manager.

Establish a Relationship with Your Manager and Your Peers There are two key factors that can ensure a successful relationship with your new boss:

• Knowing what she expects from you

• Earning her trust that those expectations will be met

Both take time, and you can expect occasional missed signals or miscommunications along the way.

Things to look out for include:

• Does she prefer e-mail, telephone, or in-person communications? • What are her priorities: projects, technologies, certain applications or specific user groups? • Does she prefer constant updates on details or just periodic status reports on the big picture? • Does she like to get right down to business or does she enjoy a little casual conversation?

• What did she like most (and least) about the last person in your role?

• Is she more impressed with form or function?

171.6 Starting your new job

• Is she focused on process or metrics?

• Is she involved with her staff, the mood of the department, etc.?

• Is she focused on building an empire and her own status and growth or is she just focused on doing

the best job possible? • Are her decisions based on raw data, judgment calls, or input from her staff? • Is she a consensus builder? • Is she more focused on strategy or operations?

• Does she make quick decisions and judgments or does she like to form opinions over a period

of time?

• Does she have a very formalized project management methodology or does she prefer the “let’s just

get it done” approach?

• What is her own boss like? What is her relationship with her management—do you know what they

expect of her?

Keep in mind that while you’re figuring out how to deal with a new manager, your new staff is doing

exactly the same thing with you. This frame of mind can help you keep some perspective about the

dynamics of the situation.

Remember, your new manager wants you to succeed. When you succeed, it makes her life easier by

having a winner working for her. Also, it makes her look good that she hired a good manager. You have

a built-in ally.

In a similar vein, your peers (your fellow managers) also want you to succeed. They might have

been frustrated that your team hasn’t had much direction and leadership without a manager, and might

have atrophied while there was a vacancy. They may also be a little bit more forthcoming about the

weaknesses they see in your team’s members and operations. They can also give you some insight into

the culture of the department, your boss, the company, hot-button projects, and issues.

Just like you need to do with your boss, you’ll want to build relationships with your peers,

demonstrate that they can count on you, and that you’re eager for their guidance and input as you

get settled. You don’t have to take all their guidance and input at face value, but there can be great

value in listening to it.

Learning the Landscape: Key Users and Key Applications If your new role is in a new company, there’s a lot you don’t know about your new environment, and the

sooner you start closing the gap, the better off you’ll be. Even if you’re at the same company, you have

to look at these issues with a new perspective.

The first thing you may want to know is who your key users are and what the key applications and

systems are. Depending on the industry you’re in, the answers could differ considerably. If you’re

working for a law firm, the key applications may be the document management system and the system

for recording billable hours. In a manufacturing plant, the key applications probably revolve around the

supply chain.

You also want to learn some basic information about the environment, some of which may have

come out when you were interviewed.

• How many locations does the company have? • How many users are there at each location?

18 CHAPTER 1 The Role of an IT Manager

• How large is the technical environment (e.g., number of servers, amount of storage, number of

applications, size of the network)?

• What are the company’s policies towards personal e-mail, cell phones, tablets, etc.?

• What are the key applications? • Is it staffed 24/7? If not, how is after-hours support handled? • Is IT distributed or centralized? • What are the compliance requirements?

• Historically, where have the major problem spots been?

• Who are the key vendors and partners?

• Is there any documentation about policies and procedures and current projects?

• What are the high-level technology standards (messaging, development tools, database, storage,

hardware, operating systems, etc.)?

Find the Key Meetings Invariably, IT is involved in numerous regularly scheduled meetings—weekly, biweekly, monthly, etc.

Some may strictly be for ITers, some may be with the users or other department heads, and some may

be situations where IT is simply an invited guest.

Start asking around about these meetings and joining in. It sounds strange to ask around for meet-

ings to attend (many people prefer to go to as few meetings as they can), but many meetings are critical.

You’ll find that some you’ll want to attend regularly, some occasionally, and some not at all. Some

you’ll be invited to and some you’ll have to wangle your way in. Meetings are also an excellent

way to increase your visibility. A well thought-out and insightful question or comment, as opposed

to just asking if there can be sandwiches at the next meeting, can speak volumes about you.

If meeting minutes and agendas are available (a worthwhile idea that is often overlooked), it can

help you determine which meetings you need to be involved in.

Be Realistic about Timetables for Fixing Problems Chances are that you’ll notice problems more than you’ll notice things that are going well. That’s okay,

it’s just human nature. The important thing is to not feel overwhelmed by the problems. No one is

expecting you to fix the world in your first week, or even your first month.

When starting a new job, it’s very tempting to refer to the way things were done at your last job,

especially if you’re proposing it as some sort of example for your new company. Coworkers will

quickly get tired of hearing it, and they’ll invariably think “if your last job was so great, why did

you leave?” You can propose the same ideas, but be careful about referring to your old job too often.

SOME FIRST-DAY-AT-WORK WAR STORIES

The following are true stories from various employees’ first days on the job:

The Employee Got Surprised • “A senior level technical director joined our company and had four direct reports and 10 more indirects. He

assumed his job was to manage his team. However, the culture of our company was such that every engineer was expected to write code, including the CTO on occasion. It was a huge source of tension in the company and eventually the CTO asked the new director to leave. It never occurred to him to ask in the interview if he needed to code, since he had not done that in years.”

Continued

191.6 Starting your new job

SOME FIRST-DAY-AT-WORK WAR STORIES—Cont’d

• “A senior-level, reports-to-the-CEO type took a job after a series of interviews at the swanky downtown office. When he showed up for the work the first day, he was informed his office was located down the street at one of the manufacturing plants. The job went downhill from there.”

• “Shortly after starting a new job I learned that my predecessor had quit after six weeks. Had I known that, I might not have taken the job to begin with. I kept wondering what he had uncovered in those first few weeks that made him decide to leave so abruptly. But I was there for six years.”

• “I reported for work onMondaymorning and themanager who had hiredme had been fired between the time I last spoke with him and when I started work! Fortunately, my new boss turned out to be a great guy, and everything worked out, but I was very surprised that first day.”

The Company Got Surprised • “Back when ITers ruled the day, an engineer left her job and joined our company because the distance between

her house and our company was exactly the distance she wanted to ride a bike every day. She had several other offers, but our ‘roundtrip’ distance fit the bill.”

• “We made an offer to an engineer and he accepted. We then sent him the employee agreement to sign and he refused the job. He did a lot of coding on the side and was concerned that the employee agreement was worded in such a way that the company might be able to lay claim to his work in the future. (We tried to convince him otherwise but he didn’t want to take the chance.)”

Everyone Came Out Ahead • “A very good friend ofmine took a job with a company because they said theywould help finance his green card. And

they did: they paid thousands of dollars and many man hours getting it done. In return, he stayed with them for 15 years and was a very loyal employee.”

—Michele Robinson (and others) Account Manager, 14 years

As you can see, sometimes things go as planned, or go better or worse than planned—it’s to be

expected.

1.7 THE FIRST 100 DAYS No Organization Is Perfect In the first few weeks (and perhaps months) on the job, you’ll start to learn about things that might seem a

little unusual. There could be strange reporting relationships (inside and outside of IT), odd standards,

inconsistencies in centralized/decentralized policies, unusual job descriptions, peoplewith titles that don’t

match their jobs (like the programmer with 20þ years of service with a manager’s title, yet who doesn’t manage anyone), overlaps of some areas, gaps in others, some things are overly complicated while others

are overly simplified, and some divisions are wholly owned while some are only partially owned.

People who have worked there for a while will probably admit that certain things don’t make com-

plete sense. If you’ve worked there for a while, you may already be aware of some of these and their

backgrounds. Certain corporate peculiarities may have a long and embedded history. Other situations

may be the result of an errant decision made by an executive who won’t admit the mistake, and as soon

as he leaves, it’ll be put back to “normal.” Other conditions may warrant changing, but the hurdles

(effort, time, political, cost) aren’t necessarily worth it right now. But take note of these situations

so that you don’t lose sight of them and can begin developing a plan.

20 CHAPTER 1 The Role of an IT Manager

There probably are reasons for everything that seems odd or strange. They may not be very good

reasons, but those are the reasons nonetheless. The important thing is to show flexibility and adaptabil-

ity. If these are the way things are, then you simply have to work within that framework (at least at the

start). You won’t be judged for what you inherited, but you will be judged by how you deal with it.

The oddities you want to focus on are the ones in your department, the ones you have control over.

But don’t feel you need to correct everything your first week, or first month. They’ve probably been

that way for years, and things will survive a little longer as you investigate why they’re that way, and

the risk and impact of changing things.

Quietly Advertising What You Bring to the Table It’s never a good idea to try and impress people right away—showing up on the job with a know-it-all

attitude and boasting about what you’ve done before and what you’ll do next. Let your results and

actions speak for you. Still, there are subtle things you can do when you first get started to give people

the sense that the company hired the right person. Professional courtesies andmaturity can go a longway.

• Speak the language of your company and its users, and not of IT (i.e., talk in business terms, not

technical jargon) • Maintain a positive attitude

• Maintain open and effective communications

• Show up to appointments and meetings on time

• Treat everyone with professionalism and respect

• Recognize the difference between moving mountains and molehills

• Ask insightful questions (and be sure to listen to the responses) • Try to convey a sense of perspective about time, which issues need to be addressed now and which

can wait to be looked into later • Return e-mail and voice-mail messages promptly

• Write professional and succinct e-mails and memos

• Take notes during meetings

• Follow through on your promises and commitments

• Deal with assigned tasks quickly and effectively

Do Some Preliminary Research before You Start You can also show that you’ve done your homework. During the interview process you’ve probably

learned some things about the IT department: which vendors they use, which project they’re working

on, which projects are coming up, etc. Doing some research on those things (as well as the new com-

pany itself) can be worthwhile. Check out vendor websites and trade journals. You’ll never know when

you might have the opportunity to subtly drop a nugget of information into a conversation that will let

people know that you have some knowledge to share.

Bring a Fresh Perspective In addition to your skills and experience, you bring something to the job that no one else at your new

company can—the objectivity that comes with a fresh set of eyes. Take advantage of that. Of course,

you don’t want to use it to question the wisdom and reason of everything at your new job, but you may see things in a way others haven’t before. There may be very good reasons, which a newcomer would

211.7 The first 100 days

have no idea about, for things being the way they are, but learning about them will give you a better

understanding of the environment.

Be on the lookout for areas and activities that seem to be ignored or overlooked because no onewants

to do them. Those are great opportunities to volunteer and show what you can do, especially if they are

in an area you excel at or enjoy. For example, if cost/benefit analysis needs to be done, volunteering

to do it is a great way to force yourself to become immersed in the topic. Similarly, if you’re a wiz

at Microsoft Project, and everyone else hates doing project plans, your expertise will be appreciated,

you’ll become fully versed on the project, and it’s a great opportunity for you to begin to take on

the project’s management (which is probably what you were hired to do anyway).

The first few months on a new job are often known as the “honeymoon period.” In the corporate

world, this could be a period of less political maneuvering and less-demanding/more-forgiving col-

leagues. Usually, people will give you greater latitude during the start of your new job. The honeymoon

period is a result of others (1) wanting to make sure you get off to a good start, (2) not holding you

accountable things for you just inherited, and (3) recognizing that new people bring new ideas that often

prove worthwhile. You may be able to take advantage of this to introduce your fresh perspective, and to

gain some leverage for implementing change.

Ask and Listen Don’t forget that you can earn a lot of respect by asking good questions, and that asking insightful

questions usually comes from effective listening. By asking the right questions, you can show that

you’re astute, that you’ve got the right perspective on things, and that you have some sort of under-

standing of the topic at hand.

The challenge is in knowing which questions are the right ones to ask. Asking how much the com-

pany reimburses for meals in a discussion about an important team trip to a remote site shows your

priorities aren’t right. Questioning the value of user-acceptance testing on a project shows you’re

not really interested in quality and like to take shortcuts whenever you can. However, asking about

a back-out plan if a proposed change fails shows that you consider all contingencies. Asking about

security, especially in today’s environment, and about performance are always safe bets.

Projects in Progress and Projects on the Horizon Projects will probably be a big part of your life (which is why we dedicated all ofChapter 4 to Project Management on page 103). Every job has projects mixed in with all the day-to-day activities. Some projects are so small it’s barely worth calling them projects, whereas others are so large that they often

are several sizeable sub-projects rolled into one.

One of your first priorities in your new role should be to learn about existing projects and those

coming up in the very near future. You should be asking everyone you meet (staff, boss, peers, depart-

ment heads, etc.) about their particular projects. There’s a good chance that in one way or another,

you’ll be involved in them soon.

Projects exist for a variety of reasons, and most of all because they are important to someone.

Maybe they’re important to you or your boss, maybe they’re important to the CEO. Either way, by

learning about the project activity, you get a sense of where the priorities are for individuals as well

as the department and company.

22 CHAPTER 1 The Role of an IT Manager

Some of these projects may fall squarely on your shoulders, and you may find that you’re the

(unofficial) Project Manager. Some of your staff may be leading projects, and your involvement

can vary depending on how well you determine they’re being run. Other projects may just have

you as a team member, perhaps playing a very large role or perhaps a very small role.

Whether you’re forced to take ownership of a project, or simply sit in on some meetings, projects

are an excellent way to quickly become knowledgeable about what’s going on, meet others in the

organization, be involved, and allow others to see why you were hired.

Is the Status Quo Good Enough? Just because there aren’t any complaints doesn’t mean that things are “good enough.” The lack of com-

plaints may simply mean that people have grown tired of complaining and have just given up. You and

your department should always strive to be better. Of course, “better” may have different meanings:

• Better Service Level Agreements (SLAs)

• Faster transactions

• Greater regulatory compliance

• More thorough documentation

• Higher system availability • Better reliability • Improved morale • Fewer errors

• Processes with fewer steps

• Better communication with the user community

You certainly weren’t chosen for this role to make things worse, and they probably wouldn’t have

selected you if all they needed was someone to keep things as they are. It’s important to remember

that making things better is often an iterative process, where a few changes now are followed by additional changes down the road, each contributing a little bit toward overall improvement.

For example, there are a number of things you can do to increase the up time of a database:

• Keep the database software up to date with vendor patches and fixes

• Run periodic recommended database maintenance procedures

• Stay abreast of suggestions and guidelines from the vendors (hardware, database, OS) on best practices

• Ensure that the database server doesn’t have other applications running on it, which can increase the

chances of crashes • Keep the server’s operating system up to date with vendor patches and fixes

Each of these steps can improve the reliability of the database to various degrees. Taken together, they

may significantly improve the uptime statistics.

You may find that a similar approach works best in improving the overall performance of your

department. Although there may be a small number of things that can be changed to have a big impact,

your focus should also be on the continual process of small improvements that chip away at problem

areas. From your perspective as a manager, it’s sometimes very difficult to see changes on a day-to-day

or week-to-week basis. You frequently have to look back over a period of months, or sometimes a year,

and ask “remember when we used to . . . ?”

231.7 The first 100 days

People to Meet and Know At this point you’re busy developing relationshipswith your staff, your peers, and your boss, but it doesn’t

end there. There are many people you should establish relationships with. It’s a good idea to start collect-

ing names and setting up introductory meetings with key people you’ll be working with. Your boss, your

peers, and even your staff can offer some names. If you were promoted into your new role without chang-

ing companies, youmay already knowmany of these names. Youmay even have relationshipswith many

of them, but you now need to forge those relationships from the perspective of the IT Manager.

Some areas you’ll want to be sure to connect with include:

• Key user areas: Find out which areas are most dependent on IT and the services IT provides. Meet with those department heads, learn how they use IT, when they have their busiest periods, etc.

Examples may include marketing and sales, accounting, HR, and manufacturing departments.

• Senior executives: It’s always a good idea to have a strong relationship with upper management. Learn which ones are big proponents of IT and which have the worst experiences with IT. In

addition to building a good rapport with executives, you should do the same with their assistants.

• Human resources: As described later in the section (“Human Resource Issues” on page 25), you’ll probably quickly discover many HR issues. Find out who in HR you can work with to review

different situations. • Finance and accounting: IT often has one of the largest departmental budgets. You’ll want to have

someone to partner with in accounting to help you deal with budgeting issues, chargebacks, fore-

casting, tracking spending, etc. IT budgeting is discussed in depth in Chapter 6, Managing the Money on page 161.

• Procurement: IT has a large budget because it buys a lot of expensive hardware, software, and services, and all that buying generally goes through a formal procurement process. In some orga-

nizations, IT purchases go through the company’s general Procurement group. In other organiza-

tions, IT purchases may be done directly by the IT team. If the former, you’ll want to form a strong

relationship with the Procurement group to make sure your orders are handled quickly and accu-

rately. If the latter, find out how your own procurement process operates.

• Legal:With that large budget and all that purchasing come a lot of paperwork and contracts with an awful lot of legalese. Whether it’s a maintenance contract or a volume agreement with a vendor,

you’ll be working with the company’s Legal department to wade through it all.

• Audit: In all likelihood, especially if yours is a publicly traded company or if you work in a heavily regulated industry (e.g., finance, health care), you’ll be doing a lot of work with your internal audit

team, sometimes referred to as the Risk Management group. This is a result of the ever-increasing

scrutiny and demand for integrity in the IT professional in recent times. Chapter 8, Security and Compliance on page 205 details some of the topics that may have you working very closely with your Audit team.

Quick Introductory Meetings Introductory meetings can be as short as 10minutes or as long as an hour (usually it’s dependent on how

much either of you enjoys talking). You can start off by saying up front that you don’t have a particular

agenda and that you’re simply in the process of meeting key people in the company to establish

relationships. Ideally, it’s best if you can go into these meetings with some background; for example,

24 CHAPTER 1 The Role of an IT Manager

perhaps recent experiences (either good or bad) that this individual or department has had with IT or

upcoming projects you know you’ll be working on together.

More than likely, the people you meet with will ask you about your background, how you like your

new role so far, and similar questions. They’ll probably be reasonably honest, but polite, about their

opinions of IT. As you meet with all the different people, you may begin to see a pattern emerge that

tells you what kind of reputation your department has in the organization. This information can prove to

be very valuable in figuring out where the strong and weak spots are.

Human Resource Issues In short order, you’ll start to learn about the HR problems that you’ll be facing. Some you may have

known about, others you may sense by intuition, but in all likelihood most of them will be brought

directly to you, perhaps by your staff, the HR department, your boss and peers, and maybe even from

the user community. Chapter 2, Managing Your IT Team on page 31, has further discussion about this subject.

Some of your staff will be delighted to bring their pet issues to you, in hopes that a newmanager will

finally take care of things. Some things to be on the lookout for are:

• Staff who are unhappy with their job, title, or salary • Those who are unhappy with their cubicle or office

• Employees who think they are being treated unfairly compared to others

• Issues of racial or sexual discrimination

• Staff who think some of their coworkers aren’t pulling their weight

• Individuals who feel their contributions aren’t being recognized

• Employees who feel that they should be much further along in their career given their experience,

education, certifications, etc. • Coworkers who simply can’t get along

As you become aware of these issues, it’s important that you listen objectively and effectively.

Repeating what someone has said in your own words works well since it shows them that you heard

what they said. Ask questions about the situation and take good notes about what you’re being told.

Soon, Later, and Tomorrow: When Should You Address Issues Some issues may not require much follow-up aside from continued observation. For example, if an

employee says he didn’t get the rating he deserved on his last review, there’s not much you can do

about that as a new manager. However, you can promise the employee that you will judge everyone

fairly and objectively when you do performance reviews.

Other issues may require some follow-up. For example, if an employee says that he should have an

office instead of cubicle, you can check with HR to see what the policy is. Maybe the employee is in a

position that doesn’t merit an office, and you can explain the company policy. Perhaps they do merit an

office, but there may not be one available right now. You can promise that offices will go to eligible

employees, in order of seniority, when the space is available.

Some issues will require a longer term effort to deal with. If there are complaints about inequities in

titles and salaries, for example, you may find that you agree with the people raising the issue. But cor-

recting things of this nature will take time, careful planning, and perhaps some organizational upheaval.

251.7 The first 100 days

Regardless of What Happens, Let Them Know You’ve Heard Them The important things to remember as HR issues come your way are that each person deserves to know

that they have your attention and that they each deserve a response. It may not always be a response that

they like, but they each deserve one. You certainly don’t want to earn a reputation in your first weeks

that you ignore things. You can promise the team that if they bring you an issue, you will get them an

answer, but they need to know that sometimes getting that answer may take time, and sometimes

that answer may be no.

Budgeting One of the less exciting and less interesting parts of your job, but important enough to get its own chap-

ter (seeChapter 6, Managing the Money, on page 161), is IT budgeting. Few departments will spend more money than IT, and it’s important that you become knowledgeable about your department budget.

Since you aren’t likely to be held entirely responsible for a budget you didn’t create, you don’t have to

start sweating over it right off—you’ll probably be given some leeway.

The easiest way to get started is to get a copy of your department’s current budget. Then you’ll want

to ask Accounting for a report that indicates howmuchmoney your department is actually spending. By

glancing at these reports you can quickly see which categories are the largest portions of the IT budget

(and perhaps require the most scrutiny) and see where the biggest differences are between the actual

spending history and what was budgeted. Make sure Accounting knows that you want to get all the budget reports for your department.

In general, you won’t be expected to explain every dollar. However, you will want to learn about

those items that have the biggest impact on IT budgets and items with significant changes from year

to year.

As you learn about the budget you inherited, you should be thinking about next year’s budget—the

one you’ll be responsible for preparing, presenting, defending, and adhering to. As is typical, each

year’s budget is compared to the previous year’s. It’s important that you make note of which items

might go up so that you can explain them.

Making Those First Decisions There’s a saying that “20 percent of life is what happens to you and that 80 percent is how you deal with

it.” Another way to look at it is that your success is not much more than the cumulative results of the

decisions you make.

Some decisions may be easy: “Can I leave a little early today?” Others could be more difficult:

“Accounting is working on closing the books and won’t allow any downtime, but we need to take their

database off line to run a maintenance routine to prevent it from getting corrupted.”

Anytime youmake a decision, you want to make sure that it’s based on sound reasoning that you can

later defend if necessary. You may get faulted for making a bad decision, but if it’s based on reasoned

thinking, you can hold your head up with pride.

The first thing you need to do is make sure that you fully understand what the problem is, what the

implications are, and the impact of the various alternatives. Those who bring the problem to you may

provide some options, and you may have some of your own. You may want to run the issue by other

people on your team to see if they have a different perspective.

26 CHAPTER 1 The Role of an IT Manager

Depending on what’s involved, you may want to alert key people outside of IT, either to make them

aware of the situation (such as the users) or to involve them in the resolution (such as the head of

Accounting in the example given earlier).

Sometimes, the decision-making process is easier if you think about having to explain/defend the

worst-case scenarios for each alternative—if it should happen. For example:

• Your database server crashed and it’s taken seven hours to restore. To be certain that the restored

database is 100 percent functional, you should run an integrity check utility, but that will take an-

other three hours. Do you run the integrity check and sentence the users to another three hours of

downtime or just hope for the best and bring the database online as soon as it’s restored? • If you don’t run the integrity check, you risk the database being down for an additional 10 hours

(seven hours to restore again and three hours to run the integrity check you decided against the first

time). If you do run the integrity check, you have to explain why you decided against bringing it

online as soon as possible.

• Many people might be willing to take the risk by rolling the dice and not running the integrity check,

especially if they have reason to believe it may prove to be unnecessary. However, many of those

people will also change their mind when asked if they are ready to explain their decision to senior

management if they end up being wrong.

You want to appear confident and calm as you approach key decisions. These traits are important

because they are contagious. If others see you keeping your cool, they’ll probably do the same.

1.8 TWO IT DEPARTMENTS—WHAT HAPPENS IF YOUR COMPANY MERGES WITH ANOTHER? Mergers and acquisitions are pretty common events in the business sector. They come in all shapes and

sizes from mutually agreed upon merger plans to hostile takeover scenarios.

Any sort of organization merger or acquisition can have an enormous impact on the IT department,

and you as its manager. Until it is complete, there are two IT teams—each with its own processes,

standards, vendors, technologies, and culture.

With luck, your company has included you in the high-level planning for the merger. This lets you,

as the ITManager, learn about the other company’s IT department. You’ll then be able to report to your

management and advise them as to what type of effort might be involved to join two teams, systems,

and environments into one.

From an IT perspective, there are generally three ways to go about merging another company’s IT

environment. The path you choose may depend on your company’s management style (e.g., centralized

vs. decentralized), available resources, economic and market conditions, timetables, regulatory issues,

and so on.

1. Brute force. This amounts to rebuilding everything at one company that isn’t compatible with the other. This approach usually results in a shock to the system of the acquired company and its IT

department. It’s pretty painful, but is often the fastest way of getting the two companies integrated

and operating as one. Usually, the first technology addressed is e-mail, followed by business

applications, user support, operations, OS and database platforms, and networks. This process also

271.8 Two IT departments—What happens if your company merges with another?

includes evaluating procedures and vendors. The brute-force approach won’t be successful unless

the appropriate authority and mandate from senior management are in place to see it through, along

with the necessary budget and staffing resources. Expect a bumpy ride, culture clashes, and some

staff turnover.

2. Leave them alone. The opposite extreme would be to just leave the other company as is. Your company may have a culture of decentralization or divisional autonomy that supports this kind

of posture, or perhaps your company bought this other organization because they are lean,

fast-paced, and profitable and may not want to tamper with that success. In fact, your management

may hope that the parent becomes more like the adopted child, and not vice versa. In a case like

this you may not need to do much more than add the acquired company’s addresses into your

e-mail system and establish some basic connectivity. Regardless, make sure you contact the other

company’s IT Manager to establish and maintain a relationship. Share with her information about

resources your organization may have (e.g., staff expertise, volume purchase agreements) that

she may want to take advantage of. The more you share with her, the more she’s likely to share

with you.

3. Phased integration. This is the obvious compromise path. In a case like this, you work with the IT Manager of the other company to set future milestone project manager targets, each of which brings

you closer to full integration. Depending on the circumstances of the two companies, they may set

common (and integrated) goals, but take different paths to get there.

Nomatter what the situation, it’s vital to remember that what may have been the right choices for one of

the companies in the past may not be the right choices for the unified organization. Equally important is

that just because the acquired company is in the subordinate position doesn’t mean they have nothing to

offer—each can learn from the other. An emotional attachment to a technology or product limits your

perspective and can backfire. At times like this, those who can demonstrate an ability to adapt to change

will be the most successful.

1.9 Further References Websites careerplanning.about.com/cs/firstjob/a/new_job.htm (first-day tips from about.com). www.amanet.org/index.htm (American Management Association). www.asktheheadhunter.com/hastartjob.htm (tips from a headhunter about starting a job on the right foot). www.bls.gov/oco (Occupational Outlook Handbook, Bureau of Labor Statistics, U.S. Department of Labor). www.kornferryinstitute.com/files/pdf1/KFceo_whtppr_jan30.pdf (survey about senior management

terminations).

www.managementhelp.org (library of resources for managers). www.networkworld.com/news/2010/061010-job-growth-salaries.html (article on IT job growth). www.techamerica.org (IT industry association).

Books and Articles Bradt, G.B., Check, J.A., Pedraza, J.E., 2009. The New Leader’s 100-Day Action Plan: How to Take Charge, Build

Your Team, and Get Immediate Results. Wiley.

Daft, R.L., 2011. Management. South-Western College Pub.

28 CHAPTER 1 The Role of an IT Manager

Grimme, D., Grimme, S., 2008. The New Manager’s Tool Kit: 21 Things You Need to Know to Hit the Ground

Running. AMACOM.

Kotter, J.P., 1990. A Force for Change. Free Press.

Labadie, R., 2007. Hi! I’m Your New Manager! You’re New—They’re Not! So What Happens Now?

AuthorHouse.

Murray, A., 2010. The Wall Street Journal Essential Guide to Management: Lasting Lessons from the Best

Leadership Minds of Our Time. Harper Books.

Pettibone, T., 2009. The first 100 Days on the Job. Baseline Magazine March.

Pratt, M.K., 2008. IT Careers: 5 Tips for Charting Your 100 Day Plan. Computerworld October 28.

Tynan, K., 2010. Survive Your Promotion! The 90 Day Success Plan for New Managers. Personal Focus Press.

Weinstein, M., 2011. Mixing Business and IT. CIO Insight Magazine May/June.

Winters, G.C., 2010. What Your Boss Never Told You: The Quick Start Guide for New Managers. CreateSpace.

Zenger, J., 2010. The Complete New Manager. McGraw-Hill.

291.9 Further references

CHAPTER

Managing Your IT Team 2 The best executive is one who has sense enough to pick good people to do what he wants them

to do, and self-restraint enough to keep from meddling with them while they do it.

Teddy Roosevelt

CHAPTER TABLE OF CONTENTS

2.1 Keeping Employees Focused ............................................................................................................32

2.2 Employee Training...........................................................................................................................39

2.3 Employee Performance ....................................................................................................................43

2.4 Generational Issues at Work ............................................................................................................57

2.5 Further References ..........................................................................................................................62

Even with the advanced functionality available in today’s hardware and software, the human factor is

still the biggest influence on how effectively technology is used in your environment. The members of

your IT team are the ones who will select, implement, configure, monitor, and manage the technology

in your corporation. The technologies in place are only as good as the people using them—that applies

to both the end-users and the IT team.

The technology products in your environment behave in a fairly predictable manner, but people

oftentimes don’t. Managing a staff is an art, not a science.

The importance of managing a team can’t be emphasized enough:

• Become a great manager and you’ve found a career path and skill that will serve you well for the rest

of your life—both in and out of the workplace.

• Fail to manage well and you may find that your potential growth with the organization is limited

at best. • Become good at it, and it becomes your most valuable skill, and your staff and department become a

critical component and vital asset of the organization.

• Without good staff management skills, you’ll see your department’s goals and objectives become

an uphill battle, and you and your team’s value to the organization will be questioned.

IT Manager’s Handbook.

© 2012 William Holtsnider & Brian D. Jaffe. Published by Elsevier, Inc. All rights reserved. 31

2.1 KEEPING EMPLOYEES FOCUSED IT Managers must set clear priorities, explain the company and department mission, and communicate

often with their team. Throughout this book, specific techniques are detailed to provide you with

methods to accomplish these goals.

Establish Priorities One of the most important, but often unnoticed, functions of a manager is to set priorities; these can

include actions such as allocating staffing and funding to various projects, provisioning of technical

resources (such as hardware), setting of deadlines, and so on. Employees who spend months working

on a project often wonder what exactly it is that their manager does. In truth, themanager is doing one of

themost important parts of his job by decidingwhich projects get worked on,when they need to start and finish, and what resources are assigned to them. A manager’s real worth is in his ability to set goals and objectives, set priorities, make decisions, and manage and motivate the team to achieve them.

Settinggoals andprioritiesmeansmanagingyour staff andyour teamso that theirwork reflects, asclose

as possible, your own priorities. Those priorities should, in turn, reflect those of the organization. (See the

section“CompanyMission,Vision, andValues”onpage34 in this chapter about thecompany’smission, as well as in Chapter 1, The Role of an IT Manager, the section “Developing an IT Strategy” on page 10.) A manager’s merit is found in his staff’s work. Of course, your decisions and priorities may be totally off-baseor theymaybe100percent on target.But if you fail tomanageyour staffwell, the quality

of your priorities will not matter: Your goals and objectives will never be achieved anyway.

Communicate with Your Team First and foremost, communicate your vision for the department to your staff. They should understand

both where you want the department to go and the plans you have for getting there. Both are important.

You don’t want to be the manager whomakes the trains run on time, but doesn’t knowwhat to put in the

freight cars. Similarly, you don’t want to be the manager who talks on and on about the wonders of train

travel but never gets the tracks put down.

The communication of your goals and priorities to your team is vital. The way you communicate

with them will vary with a project’s scope. A two-year project to implement an Enterprise Resource

Planning (ERP) application will require different communication than managing a weekend effort to

upgrade the company’s database servers.

The following guidelines can be used when communicating with your team.

Make Sure the Team Understands the Overall Objective and Goals Explain it in practical terms; for example: “implementing a new accounts payable systemwill eliminate

all manual processes and hard-copy documents, thereby reducing turnaround time to 24 hours, and en-

suring that no unauthorized payments are made.”

Explain How You Envision Achieving the Goal You don’t have to offer too much detail, especially on a large project, but you should have some

thoughts, visions, and ideas you can articulate as a type of road map. “Our first milestone is the

end of February; by then we should have a prototype system for the users to look at. By mid-year

32 CHAPTER 2 Managing Your IT Team

we should have finalized all the details. We’re looking to plan for parallel testing in the fourth quarter,

with the final cut-over set for December 31st.”

Encourage Questions and Input from Your Staff There are several reasons why you should do this:

• Asking for your staff’s input (and taking it seriously) will make your team feel like they are involved

and a part of the decision-making process; they will work better and harder on a process they feel a

part of and understand.

• They are a lot closer to the work than you are—they’ll be the first to recognize an opportunity, a

potential landmine, or a dead end. • The group will usually have important insights to share.

If the goal or plan is especially challenging, or perhaps it deviates somewhat from the company norm,

you’ll have to be that much more motivating and enthusiastic when you communicate with the team.

Ask questions of the team to ensure that they have an appropriate understanding of the project. For

example:

• How do you think we should start? • Where do you see danger zones and areas of risk? • What are the key milestones? • What kinds of resources do you think we will need? • Who else in the company do you think might help?

Listen Carefully Listening is more than just hearing the words. Notice the staff’s comments, tone, and body language.

Use these as clues to determine if your team is buying in and is behind you. This can be more of a

challenge with team members who are remote. With remote team members, consider drawing them

out more than you usually do to ensure you feel confident about their thinking. And consider using

available tools besides e-mail and phone calls (instant messaging, web-cams and video-conferencing,

social networking tools, web-conferencing) for greater interaction, and to help build a stronger rela-

tionship with them. Make sure everyone feels free to air any doubts or concerns. One technique is

to go around the table at the end of each meeting and to ask each member to express any concerns they

have and then address them accordingly. Another is to encourage the staff to call, send e-mails, or meet

with you privately (before or after the meeting) if they feel intimidated by speaking in front of a group.

Make sure you provide some guidance to your team as to when they should bring something to your

attention. Some managers prefer hearing about every detail, some want to hear only items at higher

levels, and others want to know only when there are big problems or exceptions.

Meet Regularly Meeting frequencies might vary depending on the work at hand. Weekly and monthly meetings are

common. During critical project times, it isn’t uncommon to have daily meetings. You can have

too many meetings or too few—it depends on the project. Try to establish a rhythm that people can

work with; if you establish a meeting time of every Friday morning, the team will work throughout

the week with that in mind.

332.1 Keeping employees focused

Meetings don’t have to always be project-oriented. Regular department meetings, as well as indi-

vidual meetings, with your direct reports can help foster a culture of open communication and sharing

of information.

Agile Meetings Agile is a software development methodology. Different “flavors” of Agile have daily meetings, often

called “stand-ups” or “scrums,” as critical components of their methodology. The primary idea is to

radically increase communication but in much briefer formats; they are called “stand-ups” for a

reason—people tend to ramble less when they have to stand up the entire meeting.

Project Meetings Project meetings are a separate type of meeting that have both additional benefits and potential prob-

lems. For a fuller discussion of project management, see Chapter 4, Project Management on page 103. Also in that chapter see the section “Productive ProjectMeetings” on page 128 for specific ideas on improving the quality of your project meetings.

Company Mission, Vision, and Values Another method of keeping your employees focused is to clearly outline the company’s mission,

vision, and values. These terms can be confusing or off-putting to technical personnel, but they have

an important role to play in the success of your organization. Devote a little time to understanding and

following them and you will be rewarded many times over. All of these can provide helpful guidance

and criteria when making operational and strategic decisions.

• Amission statement explains the fundamental purpose of the company or organization. It concen- trates on the objectives for the present, who the customer is, and what the critical processes are.

Starbuck’s mission statement includes the phrase: “Apply the highest standards of excellence to

the purchasing, roasting and fresh delivery of our coffee.” • A vision statement takes the mission statement to the next level by outlining what the organization

wants to be. The vision statement focuses on the future and serves as a source of inspiration for

employees. Starbuck’s vision statement includes the phrase: “To establish Starbucks as the most

recognized and respected brand in the world.”

• Company values: Some companies place their highest value on customer service, or integrity and honesty. Some may have shareholder return (which is often a euphemism for profitability) as a pri-

ority. Many companies’ value statements include references to being “green,” or giving back to the

community, etc. Starbucks’ site includes the phrase “[being] dedicated to serving ethically sourced

coffee, caring for the environment and giving back to the communities where we do business.”

Defining and articulating the company’s mission, vision, and values shouldn’t be your responsibility as

an ITManager; someone else should be doing that for you (and the rest of the company). But once your

company has a mission statement, communicate it to your staff. Make it clear how the company’s mis-

sion, vision, and values will impact your group’s projects, assignments, priorities, and contributions.

Also, explain how your team’s efforts will support the company’s mission, vision, and values.

Company values are a means you should use to keep your employees on the right track. If your

company hasn’t made its values clear, ask your management to do so. Again, defining and communi-

cating company values aren’t your job; you can participate if a company-wide committee is formed, but

34 CHAPTER 2 Managing Your IT Team

you should not have to come up with these on your own. “Company values” are defined by the entire

company and can be useful guides in determining employee behavior. They typically include state-

ments such as “taking care of our people: The key to our success is treating people well. We do this

by encouraging associates to speak up and take risks, by recognizing and rewarding good performance

and by leading and developing people so they may grow” (corporate.homedepot.com).

In addition to communicating the company’s mission, goals, and values to your team, it’s also vital

that you share with them the goals and values of the IT department, objectives that should reflect both the company’s mission and your own goals and values. Coming up with the goals and values of the IT

department is something you should do collaboratively with your team. Solicit their ideas and let them

review and comment on drafts. You may want to even have the team take the first cut at putting these

together by asking for volunteers for a small committee to develop them for your review.

Be as Clear as Possible about Your Real Priorities It takes more than just stating that something is a priority for everyone on a team to realize that it is a

priority. If coding a specific interface is a critical task for a larger project, you have to say so, but also

remember that your actions can dilute your words. If you rarely ask about the status of the interface,

or only one person is assigned to work on it part-time, even though you say it is a priority, you’ll be

sending mixed signals. You can demonstrate the task’s importance by focusing on it during meetings,

reallocating additional resources to it, sacrificing lesser priorities for it, and so on.

Avoid Burnout in Your Employees With IT so critical to today’s organizations, the demands on the staff can be enormous. Glassy-eyed

programmers, cases of Red Bull, sleeping bags under desks, and 3 AM pizza deliveries have become

routine. And, these demands have only increased in recent years as economic downturns have placed

increased workloads on shrinking resources. IT demands are heavy because:

• Virtually every aspect of an organization is dependent on IT and its services.

• In the digital world we now live in, the workplace is 24/7/365 and the demands are nonstop. The

technology allows people to work 24 hours a day, from anywhere in the world, on devices that slip

into a pocket. • The lure of a complex technical challenge often excites people to work 20 hours a day. (In the early

days of developing the Macintosh, Steve Jobs handed out T-shirts that read: “Working 90 hours a

week and loving it.”)

• IT staff is needed during working hours to ensure that systems are running as they should and

responding to problems. However, the staff is also needed during off hours because that’s often

the only time that certain work (e.g., maintenance, upgrades) can be done.

• Unlike the days of assembly-line labor, the work of IT isn’t measured in products produced per unit

of time so there are no clear external indicators of when the work is “complete.” (“The IT job is one

where you get an ‘F’ if you fail but only a ‘C’ if you succeed—this stuff is supposed to work, right?”

Bill Gates, Business @ the Speed of Thought.) • Highly energized and motivated employees may not even realize the condition they are getting

themselves into. While it may be tempting to push your staff, or allow them to push themselves

to the limit, it’s important to remember that you won’t get much work out of them once they’ve

hit that wall.

352.1 Keeping employees focused

• The new, streamlined corporate world demands even more of IT departments, while simultaneously

either keeping staff at current levels or even cutting back. The challenges have stretched many IT

departments to the breaking point.

Make Your Employees Aware of the Dangers of Burnout Often people most susceptible to burnout are the ones unaware of the problem. They work like dogs for

two years and then they crash. Keep your eye out for employees who seem to be burning out. Fatigue

and difficulty concentrating are obvious symptoms. Also look for changes in employees’ behaviors and

attitudes. If a normally enthusiastic employee suddenly seems apathetic, it could be a tell-tale sign. Of

course, there are other explanations for these symptoms as well. You may not notice these yourself;

other members of the team may see them before you do, but they should be on the lookout for the signs

and should feel comfortable alerting you.

Outline the Prices Employees Can Pay When making them aware of the problem, outline the various possible costs of burnout:

• Deterioration of health

• Errors on the job

• Relationships with coworkers suffer • Problems at home with family and relationships • Loss of job

The short-term gains for working weekends for six months in a row don’t outweigh the long-term losses

of any of the ones just listed.

Deal with the Situation As the manager, you need to be more aware of the problem of burnout and take steps to monitor and

avoid it:

• Be very clear about your performance and productivity expectations regarding your employees.

Define simple measures and metrics and communicate them clearly and often. Get realistic com-

mitments from your employees regarding timelines and deliverables. Also, make sure they feel safe

in telling you when your expectations are too demanding or unrealistic. • Be very conscious of the levels of effort all of your teammembers are putting out. And don’t think in

absolute numbers. A 10-hour day may not seem like a big deal to you, but it can be an enormous

commitment for a single parent or a person just coming off working three demanding projects.

• Spread the effort around. The amount of IT work is endless—as a manager, you have a responsi-

bility to your company and your employees to carefully allocate work across the board. Certainly

people have different work outputs, just as they have different working and communication styles.

Your job is to consider the team as a whole, each person as an important part of that whole, and get

the jobs done within that context. • Make changes in personnel to reflect the needs of the jobs your team must perform. Need more

people? Ask for them, and do so with concrete, numerical evidence of why you need them.

Is one person on the verge of burning out because the company has overworked her? Shift that

person’s responsibilities. Is one person over his head in his job? Look for other places within

36 CHAPTER 2 Managing Your IT Team

the department that this person can contribute more effectively. (Care needs to be taken when doing

this, because the employee may not understand.) In general, the IT world isn’t for the fainthearted.

• Be aware of howmuch different people can give. Some employees can only deliver 40 hours’ worth

of work in a week, even if they are at their desk 60 hours. Others can easily double their efforts, for

short times, in response to specific needs. Often, running at top speed isn’t the best way to get there.

Be sensitive to what motivates your employees, as well as their needs and limitations. Be aware that

people can only be pushed, or even push themselves, so far. Recognize when they can be pushed

further and when you have to insist they take a break. Do this well and you’ll be rewarded with a far

more productive and motivated team.

Managing Remote Workers (or Teleworkers) Technology has ushered in a global economy and the ability for employees to get their work done from

anywhere in the world. In the past, working remotely may have meant working at home because a bliz-

zard closed the roads or to take care of sick child. Today, teleworking may mean working from home

full-time, certain days a week, or working in a different office from your boss and peers. Teleworking is

used by employees, outsourcing companies, and contracts and consultants. These workers may be as far

as around the world, or as close as around the block.

The trend for teleworking is growing because it provides a number of benefits:

• Improved work/life balance for employees

• Cost savings for employee (e.g., commute) and employer (real estate)

• Reduced environmental impact

• Considered a perk for (some) employees so it is easier to attract and retain talent

• Ability to recruit from a geographically wider talent pool

• Increased productivity

TELEWORK FINDINGS

A survey by WorldatWork released in 2011 reported that U.S. employers offer four types of telework, and many offer more than one kind of telework program at a time:

• Ad hoc telework (e.g., to meet a repair person, care for a sick child) (83%) • Telework on a regular monthly basis (at least one day per month, but not full time) (58%) • Telework on a regular weekly basis (at least one day per week, but not full time) (57%) • Full-time telework (every regularly scheduled workday) (37%).

“Telework on a regular or full-time basismight be evenmore common if not for certain obstacles getting in the way of telework for many,” said Alison Avalos, research manager for WorldatWork. “Nearly four in every 10 surveyed organizations say that resistance from top management or the lack of jobs conducive to these arrangements are keeping them from offering all types of telework programs.”

Other results:

• Full-time telework is more commonly offered by large corporations (20,000 employees or more). • Telework locations vary, but “home” is most frequent. Nearly 70 percent of organizations that offer at least one

type of telework say employees routinely work from home. • Telework programs often are featured in recruitment. Organizations with telework programs are more likely to

feature those programs when attracting talent, indicating that organizations use these programs to distinguish themselves as an employer of choice.

Source: www.worldatwork.org/waw/adimComment?id¼48318

372.1 Keeping employees focused

The key thing to remember about teleworkers (also known as remote workers, mobile workforce, work-

from-home staff, etc.) is that it is more challenging to develop and maintain effective relationships with

them because you won’t have the very important in-person, face-to-face interaction with them. That’s

not to say that you can’t have an effective relationship with them, it just means that you have to work

differently at it to do so.

Some guidelines to help you with managing teleworkers:

• Work with other departments (HR, Legal, etc.) to develop clear and consistent policies about tele-

working. This can include what the company will do or provide, what is expected of the employee,

what expenses will be reimbursed, etc. • Make sure you understand—and convey this to your team—that there are a wide range of telecom-

muting options. Some employees need or want only one day a week (some companies offer four 10-

hour days as an alternative solution to this issue) and some companies are fine with only occasional

in-office days (as the rise in “hot-desking”—the practice of taking any desk that is available that

day—demonstrates).

• Ensure that the employee has access to the appropriate tools to do the job (hardware, software, con-

nectivity, etc.). • Make sure that you and your team have access to tools to facilitate collaboration and communica-

tion with remote workers. This can include instant messaging (with voice and audio), webcams,

web conferencing, video conferencing, etc.

• Consider telephony solutions (like call forwarding, VPN phones, soft phones) so that your remote

workers can be reached just by dialing their extension, and not having to look up their home phone

number.

• Make the effort to regularly talk (not just e-mail or IM) with your teleworkers. A regularly recurring

appointment for status updates is ideal, in addition to the ad hoc chats. • To help the teleworker feel that he’s part of the team, be diligent about sharing information with

him, at least as much as you ask for information. This can even include what other team members

are working on, even if completely unrelated to the teleworker’s projects.

• Include non-work topics (e.g., family, weekend activities, etc.) in your discussions with the tele-

workers to help make up for the loss of small talk that helps develop relationships with people

you see in person.

• Encourage, anddirectly ask for, feedback, advice, and suggestions from teleworkers. In fact, thenum-

ber one pet peeve about teleworking, as reported in a 2011 report fromMicrosoft, was “cannot speak

face-to-face” (source www.microsoft.com/presspass/download/features/2011/05-18Remote. pptx).

• Be prompt in responding to a teleworker’s queries, just as you would for the employee who poked

his head into your office to ask you something.

• At meetings, use a speaker phone to ensure that the teleworker feels that he’s part of the group dis-

cussion, make sure he has copies of all documents in advance, and actively include him in the

discussion by specifically asking him for feedback and comments.

While it’s important to develop the skills and habits to effectively manage teleworkers, you, as an IT

manager, need to be particularly knowledgeable about the subject since any sort of teleworking program

at your companywill rely on you, your department, and the technology solutions you bring to the table to

38 CHAPTER 2 Managing Your IT Team

help make it a success. And, don’t forget, it’s entirely possible that you could be the remote worker. If your boss is in another location, she may be relying on these very techniques in managing you!

2.2 EMPLOYEE TRAINING Training is always an issue for managers. Although they know that it’s a perk that employees often

enjoy and it improves employees’ skills, they are also concerned about the cost, the employee being

away from his full-time responsibilities, and the fear that the employee will use the newly acquired skill

to seek another job elsewhere. However, a few days or a week at a training class can serve as a respite

for a hard-working employee as well as increase his skill set and usefulness to the organization. Some

companies provide tuition reimbursement toward a degree.

Because learning new skills is such a critical part of working in IT, providing training is an impor-

tant part of managing an IT staff. There are so many IT classes offered that it wouldn’t be difficult to

have someone spend more time at training classes (and trade shows) than they do at work. As amanager

you have to balance a few items when doling out training:

• Cost

• Need

• Employee morale • Scheduling demands

Cost There are two issues associated with the cost of employee training:

• The cost of the training itself

• The cost of having the employee away from her full-time responsibilities

Often, the second issue far outweighs the first. The expenses for an employee to attend a training class

vary greatly. Some classes are offered either locally or online, and may only be three hours in length.

However, many training options include cross-country travel, which requires hotel, rental car, and

travel expenses that can inflate the cost of the class by a factor of two or more.

Despite those variances, the real cost issue is often the expense of having an employee away from

work for a period of time. Can you spare this individual for an entire week? Sometimes several people

are sent to training together. Can you spare all of them? Sometimes contractors can fill in for staff mem-

bers who are at training; in this case the costs are fairly easily measured. But other times, some of your

other employees or people from other departments need to fill in; the “cost” of these solutions, while

not always visible, is often much higher than a week in a hotel.

When thinking about the cost of training, it is important to remember that it is generally less

expensive to train an existing employee than it is to recruit a replacement. In other words, training

can be a relatively inexpensive tool to retain an employee and a more cost-effective way of improving

the team’s skills (as opposed to going out and recruiting for those skills).

392.2 Employee training

Need What is the short- and long-term value of this kind of training for an employee? Often the needs are well

defined: Joe needs a Database Administrator class because he will be helping out Maria. But other

times, the issue gets cloudy: Mark wants to take a class on programming for mobile and tablet devices,

but that isn’t his exact responsibility right now and it isn’t clear that the company is going to be creating

apps for those markets anyway.

“Need” may appear to be the clear deciding factor, but often the value of taking a training class is

unclear. If that is the case, you should use some of the other criteria listed in this section to help you

decide whether or not to agree to have an employee take a training class.

Scheduling Demands This is probably the most difficult issue to deal with. Many of your own staff will find the issue dif-

ficult, rightly recognizing that a week away from the office means a week of catching up when they get

back. Who will cover for them? If they are overburdened right now (as many IT people are), how are

they ever going to make up for a lost week’s worth of work? The answer is pretty simple: Evaluate the

short-term costs versus the long-term gains. See the previously mentioned three items; if the direct

costs aren’t overwhelming, if the employee (and your department) needs the training, and if their

morale will be improved, go for it—and have them go for it.

Remember that the traditional five-day instructor-led classes are just one option. Making use

of shorter (and more content-targeted) classes, as well as online instruction (either interactive, or

view-only) have proven to be very popular, effective, and cost efficient.

Employee Morale Many employees view training as a reward. It provides them with concrete, resume-enhancing skills,

sometimes lets them “get out of the house” by traveling to a warm spot in midwinter, and often allows

them to interact with professionals with the same interests and questions.

In addition, sending a staff member to a trade show or training course can be an excellent way to

motivate employees. Both you and your employees need to aggressively monitor your skill sets to make

sure they are current and useful.

Also be aware that sending one person to training can occasionally cause a second person to feel

resentment. One of the challenges any manager faces is how to juggle multiple responsibilities, such as

how to manage multiple people. Make sure you spread the “wealth” around so that feelings like these

have no basis in fact.

How Do You Know When Your Employees Need Training? There are three principal ways to identify when an employee needs training.

1. They tell you. IT people are deluged by training class offers and by situations where they are aware of their technical shortcomings in one area or another. Asking the boss for a class or two is a com-

mon request. (Asking for a weeklong class on a cruise ship in the Bahamas is less common, but not

unheard of.) You should consider an employee’s request for training as a positive indication that

40 CHAPTER 2 Managing Your IT Team

they are interested in learning and doing more for the company. (It could also be an indication that

they like being out of the office or are looking to beef up their resume.) In addition, look at your

employee’s goals. Are they asking for the training to meet the performance goals and development

plan you both set together?

2. Your customers tell you. The IT department’s customers can be one of a variety of groups: they can certainly be outside customers, but they can also be (sometimes exclusively) internal customers.

In either case, if you solicit feedback from your customers about what their IT needs are, you may

hear about specific technical services that your department can’t provide without either (1) getting

more training for current employees or (2) hiring someone else to do the job.

3. You find out on your own because you are a proactivemanager. Learn to address training needs before they become problems. If you do this, you’ll save yourself tremendous time, money, and

effort over the long term. You’ll anticipate your department’s needs for Ruby on Rails developers

and start running the ads months in advance, knowing that particular talent is hard to find. You’ll

budget for a new Help Desk support analyst in advance, before the seasonal sales cycle kicks in and

all the calls come in. And you’ll send your people for training in Windows network administration,

for example, before the project to upgrade starts.

Certification Most IT Managers don’t have the luxury of sending people to training just for the sake of training. As

such, few IT departments are willing to sponsor their employees for training that leads to vendor or tech-

nology certification. This is simply because managers know that some of the classes in a certification

program these days are fillers—they are of little or no use to a specific employee’s job responsibilities.

Of course, there are exceptions. Somemanagers may use certification, or training in general, as a way of

rewarding highly valued employees or for those employees whose responsibilities are very specialized.

Also, while sending an employee to the requisite classes doesn’t guarantee certification, the employee

still has to pass the exam. (Note that some companies won’t pay the exam fee if the employee doesn’t

pass, which creates a nice incentive for the employee to work hard to pass it on the first try.)

Different certifications have come in and out of fashion over the years. At the start, in the early

1990s everyone wanted to be a CNE (Certified Novell Engineer). Years later, network certification

became the most popular, such as Cisco’s CCNE. Beyond that, security and project management

became the “it” certificates to have (CISSP and PMP). The value of certification is discussed in more

detail in Chapter 3, Staffing Your IT Team on page 65.

What If the Employee Takes a Training Class and Then Uses His New-Found Skills to Find Another Job? Be Honest about This Problem One effective technique is simply to address the issue with the employee beforehand, while you are still

making a decision about whether they should go to training. As is often the case in business situations,

bringing the topic out in the open can go a long way toward easing everyone’s fears. Just discussing the

issue doesn’t create any legal arrangement, of course, but it should let both sides know where the other

stands. As a manager, you can openly express your concern about the possibility that the employee will

“take the training and run.” You hope the employee will reply that the job is much bigger than one skill

412.2 Employee training

set, they like the environment, they would work here for free they like it so much, and so on. But if they

don’t, if they hedge or are evasive, or blurt out a series of negative statements, you’ve probably got a

problem that a training class isn’t going to solve.

Employee Agreements Some companies have a policy that says an employee has to sign an agreement to reimburse the cost of

training if she resigns within Xmonths of taking a class. Of course, many employers and employees are

hesitant about even making such an agreement because it creates somewhat of a non-trusting, non-

supportive relationship. Before asking your employees to agree to something like this, make sure

you discuss the issue with your HR department—there is probably an existing policy about it.

Because the IT world is so fluid, this situation works the other way, too. Employees can spend

months on certification programs for a company and then the company changes direction. For example,

one IT Manager had his entire Oracle database certification paid for but the company decided (at the

last minute) to stay with Microsoft SQL. He eventually left to go to an Oracle shop.

Nontechnical Training When considering IT training, you generally think about technical training. It’s important to remember

that some of your staff may also benefit tremendously from nontechnical training as a way of expanding

their horizons, such as the following:

• Time management (for those who have trouble staying organized)

• Business writing (for those who have to prepare memos and reports)

• Presentation skills (for those who have to give presentations to groups)

• Interpersonal skills (for those who need help with communications or conflict management)

• Supervisory skills (for those who have a staff to manage)

• Project management (for those responsible for keeping projects on track) • Leadership skills (for enhancing management skills)

Nontechnical training can have tremendous value. Employees may not appreciate it as much as tech-

nical training, but youwill value it. You can tell an employee that you’re sending him to a nontechnical training class because you have hopes to move him up in the organization and he needs to increase his

skill set, or you might tell him that his deficiencies in these areas are holding him and/or his team back.

Your HR department can be the best source for nontechnical training information. Training options

are now more flexible and more accessible than ever before; in addition to the explosion of night and

part-time schools, companies that provide on-site training, online courses, and the myriad of different

media-based educational options make getting trained much more convenient.

Maximizing the Value of Training If you send employees for training, it’s because you see the need. It’s then up to you as their manager to

make sure that they’re putting these skills to use. You should review the course curriculum to get a feel

for what the employees should be able to do after completing the class. If an employee isn’t using the

skills learned in a class, it could be because the selection of that particular class was a poor one or that

you haven’t challenged them to use their newly acquired skills. In addition, consider the following

training ideas.

42 CHAPTER 2 Managing Your IT Team

• Have the employee who went to training give an informal training session to the rest of the team.

You can then see how much the employee learned and give your entire team some of the benefits of

the training.

• Have the employee formally train employees who didn’t attend the training; if the employee goes to

the initial training with that goal in mind, it can add value to their experience as well as save the

company money. • Consider on-site training where the content can be more contextually specific to your organization

and your configuration, and more employees can attend.

You want to be sure that your employees are aware that you have expectations for the money you spend

on their training and that you see it as an investment in them and the team.

2.3 EMPLOYEE PERFORMANCE While employees are your biggest asset, they can sometimes become a large liability, too. As discussed

earlier, one of your key roles as a manager is to keep employees focused on their tasks, objectives, and

priorities. However, in addition to this, you’re also responsible for employee performance reviews,

dealing with disciplinary problems, and terminations.

Performance Reviews Performance reviews are probably the single most important discussion you’ll have with members of

your staff. Although performance reviews are traditionally a once-a-year event, some companies are

now doing them twice a year. Regardless of the frequency, a professionally done review should be

approached the same was as your taxes: Do the work in small bits all year and you will be ready when

the big moment arrives—eliminating any chance of surprises for you and the employee at what is

discussed. The end result should be the formalization of 12 months of regular discussion, feedback,

analysis, and evaluation. This should be your overall goal as a manager when working with the

reviews of your employees. The annual review process gives you a chance to document the employee’s

accomplishments, dedication, commitment, challenges, and opportunities for improvement.

Performance reviews are often used to resolve two other important employment issues: rewarding

good performing employees and addressing poor performing employees.

Poorly written evaluations make both of these tasks even more difficult and the costs of failing at

this are high:

• Mishandled terminations can (and often do, these days) end in lawsuits.

• Mishandled reviews of good performers often lead to their changing jobs to get what they should

have received from you. • Poorly done reviews can leave an employee feeling demoralized, worried about her job, and dis-

couraged, when what you had really intended to do was offer some motivation, encouragement, and

constructive criticism.

• Ineffective reviews of poor performers may lead them to think that all is fine, and they can just “stay

the course.”

432.3 Employee performance

Many companies have evaluation forms that have been developed by the HR department. Some forms

are generic, whereas others are designed to reflect the company’s mission, values, and goals. There are

also many offerings of applications that allow you to put the whole process online. Other companies

have no forms and leave it up to each manager or simply rely on a memo-style format. However, a form

generally won’t help you since a useful evaluation should really consist of descriptive narratives,

specifics, examples, and commentary—not merely checked boxes.

No Surprises! Neither you nor your employee should be shocked when review time comes around. For example,

you should not suddenly discover that the employee finds your project assignments to be lacking in

clarity, and they should not suddenly discover you strongly resent the hours they spend on Twitter

and Facebook. In both cases, the problematic behavior can’t be corrected if the person isn’t aware

it is a problem. Any negative comments that you include in the review should be items that you’ve

discussed with the employee multiple times in the course of the year. If they are a superstar employee,

you should’ve acknowledged their work and achievements throughout the year; and they should know

that, in general, the review is going to be a very positive experience. If the employee is struggling, they

should be aware of that before the formal evaluation because of conversations you’ve had with them.

In either case, a little work on your part throughout the year will richly reward you when it is time to do

reviews. The last thing you want to hear from your employee during the review process is “this is the

first I’m hearing of that” or “I wish you had told me sooner so I could’ve worked on correcting it.” You

can even consider doing informal reviews once or twice during the year.

Key Areas of Evaluation Some of the areas that you want to consider when reviewing an employee’s performance include:

• Quality of work

• Flexibility

• Creativity in solving problems • Communication skills • Innovation • Going above and beyond the requirements of the job

• Coordination, interaction, and collaboration with others (particularly those they don’t have direct

authority over)

• Accountability

• Ability to complete assignments in a timely manner

• Ethics and compliance • Ability to pick up new skills on their own • Ability to work with and enhance the work of other staff members • Ability to manage short- and long-term projects

44 CHAPTER 2 Managing Your IT Team

Quality of Work Is this person providing excellent, just mediocre, or subpar work? Not every staff member will give you

spectacular performance. But your needs as a manager may be such that this person fulfills certain other

critical functions: they may be a team member who keeps others enthusiastic about the project, sets a

good example for keeping focused, or has a deep knowledge of company operations and history and

provides long-term perspective to decisions.

Flexibility Most roles have job descriptions, some job descriptions are even written down(!), but almost no job

description adequately anticipates the real-world demands of the position. (See the section “Position Descriptions” in Chapter 3, Staffing Your IT Team on page 74). It’s important for every employee to understand the real goals of the department and how he can help achieve those goals. Changing mar-

ket conditions, changing project demands and priorities, and changing technical capacities all require

employees to be flexible about their tasks. Has this employee adapted well to the fluid requirements of

the job?

Creativity in Solving Problems Along with flexibility about their job descriptions, good employees are often resourceful and creative

in solving problems. Five new employees started Monday, but only four laptops were delivered; a

creative employee might find one in the test lab to tide them over. The rush order for two new servers

needs a manager’s signature, but she called in sick today; a creative employee will find a manager from

another department or the manager’s boss to get the order started.

Communication Skills Can this person communicate well? Are their e-mails clear and easy-to-read, or are they rambling and

take 10 minutes to read and are still difficult to understand? Are they personable? Do they make eye

contact? Do they speak well in meetings, do they make personal attacks, or do they say nothing at all?

Technical people are often not great communicators because their jobs often don’t require tremendous

amounts of interaction. But there is a base level of information exchange that every job requires and a

base level of interactive behavior that every organization requires. If a person works in a group, there

are certain standards that must be met. And in the new agile, just-in-time corporate world we work in,

communication is more important than ever. There is a much greater sense of urgency now and

employees who are at the forefront of the work—as IT workers often are—find themselves having

to be much more communicative than ever. Note this in the employee’s review; often technical people

do have a more difficult time communicating, and if they do a good job at this, that should be noticed

and recognized by their manager.

Innovation Today’s technology can be used in many different ways. And when multiple technologies are

combined, the possibilities for new ideas grow exponentially. Innovation is the ability to think outside

the box, and is an attribute for finding new ways of doing things or doing new things. This could be

anything related to simplifying processes, reducing errors, or finding additional uses for existing tools.

452.3 Employee performance

Going Above and Beyond Requirements of the Job Many employees view their work as nothing more than a job, a day’s work for a day’s pay, and have

almost an adversarial stance about doing anything more. Can you fault someone for doing only what

they are supposed to do? However, for those who view their work as more of a career than a job and

seek to be promoted and moved up, going above and beyond the job requirements is one of the best

ways to achieve those goals. This can include helping out coworkers, putting in extra time, volunteering

to do the more challenging tasks, working on items that no one else seems to want to do, and so on.

Coordination, Interaction, and Collaboration with Others (Particularly Those They Don’t Have Direct Authority Over) “Plays well with others” is another way to describe this attribute. It simply means that they work well

with others—their peers on the team, as well as customers, clients, users, among others. This could

apply to situations where a large team is formed for a particular project or routine activities, as well

as the case of individual contributors that have to interact with others only periodically. It also means

gaining the respect of those you work with. To do all this well requires a numbers of skills and traits:

interpersonal style, influencing, leadership, communication/listening, trust, adaptability, compromise,

and relationship building.

Accountability Managers look for accountability in their employees primarily because it makes the manager’s job eas-

ier. A manager prefers knowing that when an employee is assigned a task, it will be done, and the man-

ager won’t have to do regular checks to ensure that work is progressing. (See the next item on

completing assignments on time.) Accountability also means that employees will recognize what their

own responsibilities are and will not sit around waiting for the manager to tell them what to do. If your

staff isn’t accountable, you end up as a micromanager. However, it’s up to the manager to make their

employees feel accountable through follow-up, project assignments, stated goals and objectives, and a

clear statement of the job requirements, as well as the impact to others when things don’t go as planned.

Ability to Complete Assignments in a Timely Manner Timely performance is critical in all environments. Gone are the days when deadlines were approxi-

mations and missing them had few consequences. “Just in time” no longer refers to an inventory tech-

nique; it now is often used to describe how entire departments and companies act in response to market

conditions.

Be clear about your expectations for timely performance and let your staff know you’ll be using that as

a criterion for evaluation. Let them know that you are being evaluated on that basis as well. Installing the

new phone system by Monday instead of Friday may be suddenly required, but create an environment

where people feel comfortable suggesting coming in on Saturday (or at least discussing if it is necessary).

Ethics and Compliance Over the past few years, society in general, and companies in particular, have placed increased empha-

sis on “doing the right thing.” This involves everything from following laws (e.g., Sarbanes–Oxley,

discrimination, harassment) to practicing common-sense integrity (not padding time sheets, not

accepting large gifts from vendors, respecting confidentiality, professionalism, etc.). As a result, many

companies have moved to fully integrate this tenet into every part of their existence—from the

46 CHAPTER 2 Managing Your IT Team

company mission to the employee code of conduct, as well as the performance review. This is an ideal

situation where leading by example can have a huge impact. If employees see you taking a tablet device

for personal use, they can easily begin to think that personal use of company resources is perfectly fine.

Ability to Pick Up New Skills on Their Own The IT world changes so quickly that it’s an employee’s fundamental responsibility to help herself, her

department, and her company stay current. Every department has the programmer still resting on his

legacy coding skills—encourage your staff not to become that person. Some of the best and brightest

are those who can pick up new skills on their own either through experimental trial and error, learning

things on their own time, or by picking up a reference book, such as this one. See the section

“Employee Training” on page 39 earlier in this chapter for details on the issue of training.

Ability to Work with and Enhance the Work of Other Staff Members Youmay have aWindows administrator with superlative technical skills but zero people skills. Let him

know that your IT department is a team, not a random collection of individuals, and that everyone is

expected to interact professionally with each other. He doesn’t have to go to the team picnics, but

snarling or swearing at anyone else who touches the system isn’t acceptable either. These employees

often don’t realize the impact their behavior has on others or how IT Managers see it as a limitation on

the individual’s career growth.

Many a manager has had to say, “You don’t have to like all your fellow IT department members, but you have to treat them with professionalism, respect, and work with them in a collaborative manner.”

This is a common problem with technical people, and one way of solving the issue is to inform them

that their behavior in this area is part of their review.

Ability to Manage Short- and Long-Term Projects Every employee in IT is given projects, some long and complex, some short and simple. Inform your

staff that their ability to handle projects is an element you will be evaluating when it comes to review

time. Many employees might not think in project-related terms; they think their task is to get the new

laptops installed in the Sales department in the next two weeks and not see how it relates to the bigger

goal of a new sales-force automation system implementation. Of course, that is a project, a set task

with a specific goal, resources, and a timeline. For some levels and tasks, as long as they finish the

projects on time and under budget, it isn’t important for them to think in project management terms.

But those who do see the bigger picture and take the long view will probably have brighter futures.

(See Chapter 4 on Project Management on page 103 for further details on projects and project management.)

Specific Evaluation Statements The words used in performance reviews can have a great deal of impact, or no impact at all. You want

to be sure that you are clear and that each statement has meaning and value to the employee. Avoid

ambiguity and use examples and facts to back up your assessments. See Table 2.1 for some samples.

Useful Metrics If the individual being reviewed has a position that is operational in nature, you should include

quantitative metrics in the review:

472.3 Employee performance

• Network uptime

• Systems response time

• Call resolution/response time

• Project delivery time (and budget) • Number of incidents (or calls) addressed per hour (or day) • System reliability

When thinking about metrics, think about the goals for that employee and their job. How would you

determine or measure if they are meeting those goals? When goals can be measured, and are measured,

it is easier for you and the employee to be aware of how well things are going.

Guidelines for Reviews Don’t forget: both you and the members of your IT staff are salaried professionals. Act as such, and

treat them that way. Your respect will be rewarded.

Be Objective It’s important to remember that a performance review is the company’s formal assessment of the

employee’s performance. Be as objective as possible. Remember reviews of your own performance—

often the most contentious items are the subjective ones. With this in mind, your performance review

should be full of examples and specifics to back up your assessment. Providing quantifiable accom-

plishments, specific examples, and measurable goals helps you remain objective.

Table 2.1 Sample Evaluation Comments

Statement type

Example Comment

Almost useless

“Mark is a fine worker with a good attitude; he works hard and has done a good job for the company.”

While it may be true, this statement tells Mark nothingconcrete about his past performance and gives him nothing to focus on for the future.Nor is the company servedby this kind of statement. How valuable an employee is Mark, and how can it help Mark grow?

Positive “Martha was exemplary in her efforts to complete her implementation of the new healthcare plan project on time. In addition to working over several weekends, she also enlisted the help of two departments to meet the October 1 deadline.”

This is a very useful comment for Martha; she knows her efforts were noticed and the company knows they have a committed employee.

Negative “Mary Jane showed no interest in expanding her professional skill set; she turned down several offers for training classes in new programming languages and she refused to move to a new project that would have required her to learn new procedures.”

Mary Jane knows exactly what she did wrong and, if she chooses, how she can change her behavior to act differently in the future.

48 CHAPTER 2 Managing Your IT Team

Also, remember that others may read this review in the future. Other people in the company, for

example, may read this review when thinking about transferring the employee into their department

or the person may leave and may later reapply at your company. Be sure that your comments accurately

reflect the employee’s performance.

Carefully Record Details The more specifics you can provide, the more valuable the review will be for the employee. And the

more specifics you can provide now, the more meaningful it will be in the future. It’s hard to recall the

incidents you need when you’re looking back on the past 12 months. Review your own status reports to

help jog your memory. And, during the year, jot quick notes to yourself on scraps of paper that you

toss into the employee’s file, or write an e-mail to yourself that you can refer to later. Although this

sounds like a great idea in theory, it is in fact something many good managers do on a regular basis.

Details matter, and memories fade. Record them as they happen and both you and the recipient of your

work—for this is real work that managers have to do—will be better for it.

When reviewing these notes, take the long view. Try and look over the course of the entire year and

remember that you probably wrote those notes when something was going particularly well, or partic-

ularly poorly. Perhaps those comments are right on target or perhaps they represent an emotional high

or low.

As you prepare the review, you can also ask the employee for her own list of accomplishments (and

areas they think they can improve upon) over the past 12 months. (See the section later in this chapter

“Have Employees Review Themselves” on page 20.) These notes can also help jog your memory and help you understand what the employee considers her greatest achievement. Additionally, it helps you

see what the employee thinks were their important contributions. Getting her input can help you avoid

embarrassment by failing to mention something that was important to her. Remember, employees take

reviews very seriously, especially if they are less than stellar. The review becomes an important part

of the employee’s official records so you want to do your best to make sure it’s comprehensive and

accurate.

Negative Reviews Performance reviews that are mostly or entirely negative are difficult for both the reviewer and the

reviewed.

There are four important points to keep in mind if you are in this situation:

• Be as specific as possible, both about the problem area and ways to correct.

• Negative reviews should not be a surprise to anyone.

• Keep HR informed.

• Be professional.

Be Specific Not only will the session(s) probably be very emotional, but the end result can be more positive when

you can be very specific about what happened. This detail should include not only past performance but

current events; be clear and detailed in your notes about what conversations took place and what each

party said. If the employee failed to meet goals, identify what those goals were and where the employee

492.3 Employee performance

came up short. Stick to the facts and be objective. Be sure the review also covers what steps the

employee needs to take to address the problem.

It Should Not Be a Surprise Follow the guidelines outlined in this chapter; constantly communicate with your staff and record

both accomplishments and disappointments throughout the year. In some cases a written warning is

called for. If you do all this, both you and the employee should be aware of the gap between goals

and performance.

Keep HR Informed Make sure to keep your HR department informed. HR can make sure that you’re following procedures

and policies, and can bring in other resources (e.g., Legal) if the situation warrants. Plus, HR has lots of

experience in these situations and will offer guidance and assistance in the best ways to approach the

situation. If your company doesn’t have an HR department, find an appropriate third party to keep

informed of (or sit in on) the situation—your own boss is a logical choice. If you keep someone else

involved and aware of the situation, you will always have a third party to check back with later in the

process (if required).

Be Professional Take extra care to make sure that what you write comes off in a highly professional manner. Resist the

urge to list failures. Instead, cite circumstances where the employee “fell short of expectations” or

“needs development” to identify areas where the employee needs to focus his efforts. In some situa-

tions, an employee may not be aware of his own weakness; for example, his contributions and involve-

ment at staff meetings are more like speeches instead of discussions. If this is the case, consider it a

coaching opportunity for you and a development area for him.

The task of preparing for and conducting performance reviews really shouldn’t be emotional, but in

some cases it will be stressful and time-consuming.

EXAMPLE OF WHEN YOU MIGHT NEED TO GIVE A NEGATIVE REVIEW

Susie did a mediocre job, but more problematic was the fact that she was very difficult to deal with. As a result, most people avoided working with her. To make matters worse, she was used to getting very positive reviews.

When reviewing someone like this, youmight want to ask themwhat they want out of the job. Do they want tomove to the next level (e.g., from analyst to engineer), which would mean a raise along with the promotion? If they answer “yes,” then you can proceed to list all the things they need to do in their current position that they aren’t doing and then list the things that they need to do to get to the next level. For example, you could say: “You completed this first project, which is great, but the second one wasn’t completed on time. Why not?”

After the explanation is given, you can say that you understand, and in the future, they need to report sooner or more effectively about what is going right or wrong. Then, you can add, for example, after they’ve completed all these tasks (as in the case of Susie), she would need to mentor someone else or be the lead on a project. It may be that both you and she know this isn’t likely to happen. If that’s the case, and she’s unable or unwilling to say that, you have given her the motivation to either step up to the task or (honestly) find other work, because the next review will be much more explicit about this new task.

There is more discussion later in this chapter in the section “Disciplinary Problems and Terminations” on page 54.

50 CHAPTER 2 Managing Your IT Team

Have Employees Review Themselves Many companies have adopted the formal policy of having employees, in addition to their managers,

review themselves. The employee uses the same form as the manager and evaluates her performance

over the specified period of time. Naturally, self-assessment reviews (just like resumes) can contain

some elements of (how shall we put it?) “skill inflation.” Nonetheless, the exercise is a very valuable

one for both the employee and the manager. The employee gets a chance to express her views and

concerns and to talk about what she thought her strengths and weaknesses were. Identifying the

gaps between the manager’s assessment and the employee’s self-assessment can help in figuring

out development opportunities and identify where problems are.

360 Reviews In a 360-degree review an employee receives feedback not only from his direct supervisor, but from

other individuals he has worked with as well, which include peers and subordinates (see Table 2.2). An

employee may work on a project run by another department manager, for example; in that case, the

other manager can have direct input into the employee’s review. Or an employee may work much more

with two staff members and may only occasionally see their direct manager. (Some employees have

management in other states or even other countries.) In these cases, 360 reviews allow the individuals

who most directly work with the person to provide input on their performance. If your company is using

them, or thinking of using them, be prepared for more feedback—both good and bad—at review time.

A newer trend is to use 360 assessments not as formal review components, but as feedback mech-

anisms throughout the year. In other words, you or the employee may ask the manager from another

department for feedback on your staff member once the project ends, store that feedback away, and use

it during the review, or solicit input from project team members at the end of the project and use that

data later. But when review time comes around, you don’t need to poll five coworkers of the employee

or customers that person has talked to; you already have that data. You do a performance review as you

normally would using data you collected throughout the year.

A 360 review can be done in a few different ways:

• In some cases, a third party contacts the reviewers to collect their feedback and then strips out

identifying information to keep the feedback anonymous. An online tool is often used for this. • In a less formalized process, the employee can simply meet with her peers and subordinates. • In some cases, particularly if a tool is used, a report of various charts and metrics is produced to help

the employee identify highs and lows.

Table 2.2 Pros and Cons of 360 Reviews

Pro Con

360 reviews provide opportunities for people traditionally not asked for their opinions to express them; customers, for example, often have to be proactive about providing feedback to suppliers.

They generally involve a lot more data. Also, the feedback from multiple people may be inconsistent, which makes it difficult to identify pluses and minuses and figure out a development plan.

The quality of review for some workers improves tremendously because the people best suited to evaluate an individual are now involved in the process.

People who haven’t done performance reviews before are suddenly providing detailed review data; you may or may not want information on Ken’s workplace cleanliness, for example.

512.3 Employee performance

• After completing the 360 review, the employee is often asked to complete some sort of summary

report to identify what strengths and weaknesses were identified in the 360 review, as well as an

action plan to address those areas (e.g., correct weaknesses and further benefit from strengths).

If the 360 review is conducted anonymously, there is a greater chance of more candid feedback;

obviously the more honest the better. However, if the review is not anonymous, it gives the employee

the opportunity to further discuss the feedback with the reviewers, perhaps to clarify a point or even to

say “the next time you see me do that, please point it out to me because I wasn’t aware I do that.” One of

the great benefits of a 360 is that it gives the employee the chance to see herself as others see her. Very

often, this leads to some surprises (both good and bad).

How to Conduct the Actual Review Discussion When it’s time to meet with the employee to go over the performance review, remember that it’s a

discussion—make this an interactive time, not a linear one. Do not simply read the review to him. Some

managers give the employee time to read the review in advance of the review meeting so that the

employee has time to digest it and can then discuss it intelligently and unemotionally. Remember

though, as a manager, to discuss it with conviction. This is your assessment of his performance.

You should be willing to make changes for two reasons: factual error (e.g., a project was completed

on time, when you said it wasn’t, or forgetting to include key items in their list of accomplishments) or

language nuances (e.g., the employee may feel that some of the words you used are particularly harsh).

If you need to have this discussion with an employee who normally works remotely, the first choice

would be to see if you can arrange for a face-to-face discussion. If not, review the material in this

chapter on “Managing Remote Workers” on page 37, as well as the section “Interviewing Candi- dates over theWeb” in Chapter 3, Staffing Your IT Team on page 91, for guidance on meeting and interacting with people you aren’t in the same room with.

Respect Privacy If you work in an open environment, make sure you reserve a conference room or an office for some

privacy. You will both want the comfort of knowing the conversation isn’t being overheard, regardless

of whether everything is positive or not.

Tone of the Discussion Youneed to be clear in your discussionwith the employee.Depending on the employee’s performance, your

tonemayneed to includehints ofmotivation, hard-heartedness, appreciation, disappointment, optimism, and

support.At the endof the review, there shouldn’t be anydoubt in the employee’smindas towhat you thinkof

his performance, where he has excelled, where he needs to improve, and steps he needs to take to do so.

In certain cases, you might want to have specific follow-up meetings with an employee at regular

intervals after the formal performance reviews. If necessary, you may want to consider additional in-

terim informal reviews at certain, pre-specified times. (“Let’s meet again every three months to review

progress and make sure you and I are on the same page about this issue.”)

Make sure that you aren’t distracted or interrupted. The review is very important to the employee,

and they should feel it’s very important to you as well. You should be sure to set aside enough time for

the discussion.

52 CHAPTER 2 Managing Your IT Team

Development Plans and Goals While the annual review is the culmination of a year’s worth of interaction and discussion with an em-

ployee, it’s also the perfect time to start looking forward to the next 12 months to set the employee’s

goals and define a development plan.

The development plan includes those activities designed to increase the employee’s skills and

contributions. These can be technical skills or other professional development competencies, such

as presentation or leadership skills. The development plan can include a variety of activities:

• Formal training (classes, trade shows, books, etc.) • Project assignments that include exposure to new areas and opportunities to develop and practice

new skills

• Working with a colleague either as a mentor (to develop coaching skills) or as a protégé

The goals represent the accomplishments you expect from the employee in the coming year. These can

include:

• Specific project completions and deliverables • Improvements in operational efficiencies • Addressing weaknesses identified in the performance review • Skills development—both technical and nontechnical

The goals and the development plan should be developed collaboratively by both you and the

employee. You can even ask the employee to take the first cut at them and then review them with

you. Both of these should be documented and discussed during the year to review progress and to

see if they need to be updated to reflect changes in priorities or circumstances. A popular acronym

to help set goals is SMART:

• S—Specific: Goals that are too generalized are less likely to be achieved than goals that are spe- cific. Plus, being specific eliminates any ambiguity. For example, instead of “refresh older hard-

ware” you could use “replace all servers that are more than five years old.”

• M—Measurable: The more a goal can be quantified and measured, the easier it is to determine whether it is achieved. You may have a goal for improving user interface design, but if you don’t

have a way of measuring the effectiveness of the design (such as a survey), there’s no way to know if

the goal has been achieved. • A—Attainable/Achievable: When a goal is attainable, it is doable, it is within the realm of

possibility because others have done it before, and the resources exist for achieving the goal. • R—Realistic:A goal is realistic because the resources needed to achieve it are available and can be

assigned to this goal.

• T—Timely: Set a deadline for the goal so that it is not a continuous “work in progress” with no end in sight.

Salary Review The salary review is often associated with the performance review. Some companies like to do them

at the same time, whereas others intentionally like to treat them as separate events and schedule them at

different times of the year. In general, when it comes to salary reviews, you as a manager will be told

that the increase in your salary budget will be a certain percentage. In short, that means if you want to

give one person a little more, you have to give someone else a little less.

532.3 Employee performance

Oftentimes, HR will give you some guidelines about increases based on the performance review

ratings. For example, top performers should get an increase within a certain percentage range, average

performers get another range, and poor performers get less or nothing. The guidelines fromHRmay also

factor in where someone is on the pay scale. For example, if a programmer is already very well paid for

their job, their increase may be scaled back some. In many cases, between the HR guidelines and the

overall budget you were given, you may find that you have very little wiggle room for your own

discretion—you may be tweaking increases by just a few tenths of a percentage point. You may end

up spending a few hours with a spreadsheet trying to maximize the budget you’ve been given and come

up with a reasonable increase for each employee. The process for bonuses can be just as involved.

If an employee is disappointed in their increase, it sometimes helps to explain the process so that

they understand you just aren’t deciding the increase amounts on a whim and that they see there’s a

structure and policy behind the decisions.

Be careful if an employee talks about another employee’s salary. Your response should be direct and

along the lines of: “anything related to Mark is confidential and has no bearing on you and is not some-

thing I will discuss with you. However, I’m happy to talk about your job, your goals and accomplish-

ments, your salary, andmy evaluation of your performance, aswell as the overall salary review process.”

Disciplinary Problems and Terminations At some point in your career you’re going to have to have some difficult conversations with a team

member or make some difficult decisions. There can be a variety of reasons that lead up to these,

including:

• A poor hiring decision

• Performance problems or skills deficiency

• Employee not fitting in with the organization’s or team’s culture • Personal life impacting work life • Economic conditions impacting the company

All managers hate having these types of conversations with employees. They are difficult and they

generally make both you and the employee very uncomfortable. However, there are some basic guide-

lines to help ensure that the discussions are effective and to correct a problem before it gets too severe.

Disciplinary Problems Employee problems come in all shapes and sizes, everything from problems with quality of work to

punctuality, from bad attitudes and not following procedures to spending too much time on Facebook.

More extreme situations can include things such as violence, theft, harassment, ethics violations, sub-

stance abuse, and racism. In some cases, a company may have a clearly stated zero-tolerance policy,

and once the company believes there is sufficient evidence to confirm that an incident happened, the

employee is immediately terminated—no coaching, no warning, no probationary period.

Although each situation has to be approached uniquely, depending on the circumstances and the

individuals involved, there are general guidelines to follow.

First, when something is brought to your attention, you have to make the decision on how to handle

it. In some of the more extreme cases, it is very clear that you must involve others immediately, such as

HR, Security, Legal, and possibly even law enforcement. In the less extreme, and more traditional,

54 CHAPTER 2 Managing Your IT Team

employee problem situations, you have greater latitude as to how to handle them. How do you decide?

Your HR rep can be a great source of guidance, as well as company policies. As a general rule, if you’re

unsure, speak to HR. Also, consider how it might reflect on you if you’re made aware of a problem and

decided to wait before informing others. In the case of an employee who takes too long a lunch, that’s

probably not much of a problem. However, it’s a very different story if you don’t do anything if some-

one tells you that one of your employees used racial epithets.

In extreme cases, such as situations where violence is involved, HR may step in entirely and take

over the handling of the situation. In other cases, HR may work closely with you or just give you some

guidance. For the less extreme cases, you may be handling it all on your own until you feel it is nec-

essary to escalate to HR.

Outside of the extreme examples mentioned earlier, you should look at these situations as an

opportunity to grow, learn, and, most rewarding of all, coach an employee to get him on the right track.

A less extreme example of an employee problem might be his excessive surfing of the Web during the

workday. His performance is suffering and the rest of his team resents having to “carry” him. This is a

problem you can—and should—address as a manager without involving others.

As is always the case, communication is the key from the outset. Also, you want to approach the

situation in a measured manner. You should always be careful to have the facts correct, not just rely on

some rumors you heard in the break room. Depending on the situation, you may want to give it some

time to see if there’s a pattern of this behavior or if it’s just a one-off occurrence. In the case of the

employee taking too long a lunch, for example, it makes sense to see how often this occurs. (You also

don’t want to be the manager who gets a reputation for calling someone on the carpet the first time they

are 10 minutes late.)

When it’s clear there’s a problem, you need to discuss it with the employee. You need to explain to

the employee what has occurred, why it is wrong, and the impact it’s having on others and the depart-

ment. Then youmust make it clear what sort of change in behavior you are expecting to see and that you

expect to see that change immediately. For more specific issues, such as delivering reports with errors,

the corrective steps are pretty clear. In other cases, such as weak technical skills, you as the manager

may have to be involved in arranging for training or partnering the employee with a more experienced

team member. Still in other cases, such as poor attitude or disorganization, you may have to be even

more involved to help coach the employee to see the problem, its impact, and how to address changing

the pattern of behavior. Sometimes, the employee isn’t even aware of the issue and as soon as it is

brought up, it is resolved. At this point, you don’t have to formalize anything in the employee’s file,

but do make notes for yourself about the discussion.

As you continue to monitor and observe the employee, make sure to keep the communication lines

open. If you see that things are changing for the better, give some immediate and direct positive feed-

back. If things are not changing, point that out as well. While each situation varies, if you have two

heart-to-heart conversations with an employee and the behavior doesn’t improve enough or fast

enough, it’s time to have a discussion with HR. At this point, it may be appropriate to give the employee

a formal written warning. A written warning generally recounts the problems, the discussions you’ve

had, the problem’s impact, and the behavior changes you expect to see. It will probably also make ref-

erence to the fact that failure to address the problem will lead to further disciplinary action, up to and

including termination. HR usually has a standard template or format for these and will often have the

Legal department review the document.

552.3 Employee performance

Delivery of a written warning usually comes in a meeting with yourself, HR, and the employee,

where the situation is reviewed and the employee is given the warning memo. Very often, a written

warning is the kick-in-the-pants necessary to get an employee on track. Other times, the employee

may just “shut down” entirely and you can see that things are not likely to improve. The number

and timing of the discussions and warnings will vary from organization to organization, on policy,

and on the specific circumstances.

If the situation continues, the next steps are usually a final written warning and then termination.

Layoffs and Terminations If an employee has been a performance problem and you’ve taken the appropriate progressive disci-

plinary actions outlined earlier regarding discussions and warnings and the employee has still not im-

proved, it is time to terminate the employee. In all likelihood, by this point, the employee may not be

terribly surprised. Whether you, HR, or both inform the employee, the phrase “you’re fired” is usually

not used. More common ways of saying it include “we are terminating your employment,” “today is

your last day,” and “we’re letting you go.” While no termination is a good one, and more than one

manager has lost considerable sleep over it, if you handled the disciplinary process properly, you

should take some comfort in the fact that you did everything you could and gave this employee every

opportunity to address the problem. It then fell to you to take the next step, and if you didn’t it would

now appear to your boss that you’re not performing your job. More difficult than terminations related to disciplinary problems are the layoffs related to economic

conditions. In these situations, you may be directed that you have to cut a certain number of employees

and it becomes your job (either alone or in discussion with peers, HR, or your manager) to decide who.

These can be the most gut-wrenching decisions you’ll have to make as a manager because you are

severely impacting people’s lives. You need to focus on thinking objectively:

• If the company is shutting down some projects and initiatives, who are the people in your organi-

zation on those projects?

• Which employees show the greatest capacity (technical skill sets, attitude, and work ethic) to take

on additional work if the department size is reduced?

• Are there already any weak performers or disciplinary problems on the team?

These are difficult and challenging situations. Not only are the layoffs difficult enough, but morale will

suffer, and it’s entirely possible some of the remaining people will resign soon after because they are

afraid that they “may be next.”

Regardless of the situation, the discussion should be done in private, and enough time should be

provided for an employee who becomes emotional and need to regain their composure. Sometimes

HR will review some paperwork (e.g., regarding benefits, unemployment insurance) or tell them that

they’ll be receiving a packet in the mail in a few days. Depending on the policy and the circumstances,

an employee may be escorted out of the building immediately.

HR will probably offer some guidance, but it’s usually a good idea to speak to your team in these

situations, particularly in the case of layoffs. Gather the team together, explain what happened, the

difficult economic conditions, and so on. Allow them to ask questions. Give them time to be upset

by the situation. Explain to them that things will be tougher now, with a reduced work force, and that

56 CHAPTER 2 Managing Your IT Team

you’ll be relying on themmore than ever. If possible, try to bring some closure to the situation by saying

that these are all the layoffs that were planned.

In the case of a termination related to disciplinary problems, you should not reveal too much about

the circumstances, but it’s usually appropriate to inform the team that Francine is no longer with the

company. It sure beats people spreading rumors about why Francine is no longer around.

The termination package available to employees who are let go is usually dictated by company

policy and sometimes law (e.g., continuation of medical benefits). Some companies may offer

things such as outplacement services, company-paid benefits, or perhaps even use of an office and

phone for a while. Severance pay is often defined by some sort of formula that HR can provide.

However, there is usually some latitude depending on the circumstances. The employee who was

terminated for punching a coworker may not get any severance pay; on the other hand, the sev-

erance policy may be made more generous when there is a round of layoffs, as opposed to performance

issues.

ALTERNATIVES TO COMPANY-WIDE LAYOFFS

None of the alternatives proposed here are perfect, but they can often be more efficient, more profitable (in the long run), more humane, and often better received than the layoff options discussed earlier. As global economic conditions worsened starting in 2008 and 2009, organizations experimented with all kinds of different methods to save money and cut employee costs:

• Cut everyone’s hours a small amount instead of cutting certain employees’ entire jobs. This option has benefits and drawbacks but it is widely practiced in some industries.

• Cut everyone’s pay a small amount instead of cutting certain employees’ entire jobs. As just described, often individuals would prefer to take a small pay cut rather than have their coworkers lose their entire jobs.

• Offer packages to employees who are willing to leave the company. • Radically scale back the services/products/hours the company provides. Severe economic conditions force

companies to rethink their core missions and often that rethinking can be a good thing. Rather than being open seven days a week with all the staffing issues that entails, perhaps the local bakery is closed two days in the middle of the week. Rather than offering four models with 10 options each with all the manufacturing costs all of those alternatives offer, perhaps the car/cell phone/stereo company offers two models with five options each.

• Institute a mandatory one-week furlough for all employees, with no pay. • Shut the company down while there is something still left to split among those who are still left. There is some of

the “creative destruction” that is often attributed to capitalism in this idea; some companies (horse and buggy builders) need to bemoved aside to allow the new engines of change (automobiles in the early 1900s) to take their place.

• Embrace telecommuting solutions for some staff as a way to reduce the cost of office space.

Of course, these are not things you can implement on your own. You’d have to get buy-in from seniormanagement and other departments. But these ideas do show that there are alternatives in tough times. For additional discussion in managing during challenging economic, see the section “Managing the Money during Difficult Times” on page 179 in Chapter 6, Managing the Money.

It can also help to remember that more than one employee has looked back after a period of time and

said: “You know, getting laid off was the best thing that ever happened to me. I had the opportunity to

give thought to what I wanted to do in the future, I changed industries, I started taking classes in a new

572.3 Employee performance

programming language, and landed a job that I really like where I’m learning a lot.” You certainly do

not want to act like laying someone off is doing them a favor, but in many cases it may turn out to be a

blessing in disguise.

2.4 GENERATIONAL ISSUES AT WORK Never before in our history have such stark differences been seen between generations in the cor-

porate world. Think about it: There was the Baby Boomer generation, but the generations before

that didn’t have their own names. (At least not at that time; in retrospect they are sometimes

referred to as “Depression,” “Pre-World War II,” “World War II,” “Veteran,” “The Greatest” gen-

erations, etc.)

The current generations have their own names, and they are popularly classified as shown in

Table 2.3.

As shown in Table 2.3, things get confused by using alternate names for the same item. Plus, some

people like to include references to early and late components of each generation. Furthermore, the

dates used in Table 2.3 are certainly not universally accepted identifiers. While there have always been

multiple generations at work simultaneously, it is getting so much attention at this point in time because

of the degree of difference in attitudes, behaviors, values, and styles among them. And, of course, peo-

ple are living much longer now, so more generations are alive at the same time.

These differences between the generations are associated with several factors that include:

• Economic circumstances that have forced older generations to stay in the workforce longer

• Advances in technology

• Changes in approaches to parenting, including greater involvement

• Increased resources (schooling, medical, household income) • Faster paced lifestyle • Greater access to media and information • Increased expectations

Of course, there is debate as to which of these are causes and which of these are effects, but that is for a

different book. In this book, the important point is that the generations are different, people’s attitude

Table 2.3 Different Generations

Traditionalists Baby Boomers

Gen-X Gen-Y

Alternate names

Veterans, Silents, Greatest Generation, Mature Generation, Forgotten Generation

Me Generation

Generation-X, Post- Boomers, Baby Bust

Generation-Y, Echo Boomers, NexGen, Millennials

Born 1925–1944 1945–1964 1965–1980 1981–2000

% of work force

10 45 30 13

Source: Eisner, Susan, “Managing Generation Y,” Society for Advancement Management, 2005 International Conference.

58 CHAPTER 2 Managing Your IT Team

and behaviors can vary greatly among them, and you as a manager will be severely challenged if you

don’t recognize the importance of this, demonstrate flexibility, and adapt your behaviors accordingly.

Table 2.4 provides greater detail into the differences attributed to the different generations.

As you can see, the different generations can have very different ideas, perspectives, and attitudes.

The simple issue of what is considered “professional behavior” can be like night and day. The same can

be said regarding their differing views about policies, rules, boundaries, work hours, tools, and, of

course, proper attire in the work place. In short, you cannot expect all employees to march to the beat

of the same drummer.

Managing across Generations Having multiple generations on your team should be considered an enormous asset. It gives you a

greater diversity of thinking, views, style operating, and knowledge base. In a 2010 study by the staff-

ing firm Robert Half (www.roberthalf.us/workplaceredefined) there were some very positive findings:

• 43 percent of workers surveyed say multigenerational teams bring together people of varying ex-

perience levels to provide knowledge in specific areas. • 27 percent of those surveyed say working with multiple generations allows for greater diversity of

project teams so all points of view are heard.

• 35 percent say working on multigenerational teams has led to increased productivity.

• The top benefits of working with multiple generations are (1) bringing together people of varying

experience levels, (2) greater diversity of project teams, and (3) mentoring opportunities.

• Communication styles may vary, but ultimately, multigenerational teams learn from each other, and

bringing together diverse groups increases productivity.

However, that doesn’t mean you can just kick back, put your feet up, and let that diversity do its thing.

As a manager, you have to be aware of how best to manage that diversity and the pitfalls to be aware of.

For example, a 2010 Accenture study and report found that “Millennials are likely ignoring or violating

your IT policies right and left, using non-standard applications and improvising where they think it

makes sense.” In addition, the Accenture study found several important trends about Millennials:

• Many expect to use their own technology and devices rather than those supplied by employers.

• But they also want employers to provide the latest technologies. • Awareness of or adherence to corporate IT policies is limited. Millennials routinely bypass corpo-

rate approval when it comes to downloading and using technology.

Leveraging a Multigenerational Workforce Taking advantage of a multigenerational workforce requires some tuning and stretching of fundamen-

tal management skills. First and foremost you don’t want to ignore the fact that differences exist among

the generations. As such, when you create project teams, you can (and should) include individuals from

the various generations so that everyone can leverage the best of what each generation has to offer,

while also learning from each other. This includes allowing members of one generation to mentor

and coach members of another—yes, that may mean members of the younger generations coaching

the older. Don’t let age define roles and assignments—look first to skill sets and strengths. You should

592.4 Generational issues at work

Table 2.4 Generational Differences

Veterans Baby Boomers Generation X Millennials

Work style By the book— “how” is as important as “what” gets done

Get it done— whatever it takes; nights and weekends

Find the fastest route to results; protocol is secondary

Work to deadlines— not to schedules

Authority/ leadership

Command/control; rarely question authority

Respect for power and accomplishment

Rules are flexible; collaboration is important

Value autonomy; less inclined to pursue formal leadership positions

View of authority Respectful Love/hate Unimpressed Polite

Relationship with authority

Seniority and titles are respected

Desire flat organizations that are democratic

Competence and skills are respected over seniority

Flips traditional roles by the young teaching seniors (e.g., technology skills)

View toward change

“Something’s wrong”

Caution Potential opportunity

Improvement

Communication Top down; formal and through standard channels

Guarded; somewhat formal and through structured network

Casual and direct; sometimes skeptical; hub and spoke

Collaborative; casual and direct; eager to please

Feedback No news is good news

Once per year Weekly/daily On demand

Problem solving Hierarchical Horizontal Independent Collaborative

Decision making Seeks approval Team informed Team included Team decided

Recognition/ reward

Personal acknowledgment and compensation for work well done

Public acknowledgment and career advancement (money, title, corner office)

A balance of fair compensation and ample time off as reward; freedom is the ultimate reward

Individual and public praise (exposure); opportunity for broadening skills; meaningful work

Work/family Work and family should be kept separate

Work comes first Value work/life balance

Value blending personal life into work

Loyalty To the organization To the importance and meaning of work

To individual and career goals

To the people involved with the project

Relationship Personal sacrifice Personal gratification

Reluctant to commit Inclusive

Technology “If it ain’t broke, don’t fix it”

Necessary for progress

Practical tools for getting things done

What else is there?

Training The hard way— learn by doing

Too much and I’ll leave

Required to keep me

Expected and continuous

Learning style Classroom Facilitated Independent Collaborative

Sources: Zemke, Rob, Raines, Claire, and Filipzcak, Bob, “Generations at Work: Managing the Clash of Veterans, Boomers, X-ers, and Nexers,” American Management Association, 2000. Ngenperformance.com. Lancaster, Lynne C., and Stillman, David, When Generations Collide: Who They Are, Why They Clash, How to Solve the Generational Puzzle at Work, HarperCollins, 2002.

60 CHAPTER 2 Managing Your IT Team

also respect and recognize the preferences of each generation. For example, with the younger gener-

ations, consider flex hours or some telecommuting options.

Factor the generational issues into your recruiting practices. (See the section “How to Get Help with Your Hiring” in Chapter 3, Staffing Your IT Team, on page 66.) Ask the candidates about their background and experience with working on teams made up of several generations and how it

impacted the project, the other team members, and so on. Similarly, take pride in your own multi-

generational teams. When recognizing team accomplishments, be sure to include members of all gen-

erations. This is particularly well done when there’s a newsletter with a photo of the team and it’s

obvious at first glance about the team’s multigenerational makeup. Also look to tailor recognition

to each generation’s preferences. For example, a traditionalist may like a lunch with the boss, whereas

a Gen-Xer might prefer a gift certificate for music downloads.

Table 2.5 Advantages and Disadvantages of Experienced Workers and “Newbie” Workers

Some Strengths of Experienced Workers Some Strengths of “Newbie” Workers

Their time in the office is fully focused on work, as opposed to trying to blend work with their personal lives by Facebooking in the middle of meetings. They focus better.

Eric Schmidt, former CEO of Google, recalls “that shortly after joining the company . . . he was frustrated that people were answering e-mail on their laptops at meetings while he was speaking. ‘I’ve given up’ trying to change such behavior, he says. ‘They have to answer their e-mail. Velocity matters.’” Maybe. But attention to the speaker/presenter/teacher/group leader certainly matters too. Until society figures out which cell phone and PC behaviors in public are acceptable, it will be incumbent upon managers to make their standards known. “Because you can” check your e-mail during a meeting or text your colleague during a conversation with your boss does not mean it’s the right thing to do. And many newbie workers have never been told which behaviors are acceptable (and which are not) because the technology is often so new.

Those who are newer to the workforce generally have less personal demands outside the office and find it easier to put in that extra weekend needed to complete the upgrade.

Thinning or gray hair oftenmeanwisdom, experience, and perspective to your team.

Relative newbies grew up with technology and constantly had to learn new tools and new ways of doing things. It is never a challenge to convince them to let go of the old method and to try a new approach, such as send and receive e-mail from their cell phones and use social networking at work. They are less likely to be in a position where they are stuck in a particular technology and cannot be dislodged. It comes naturally to them to use any technology available in new and innovative ways. They can answer e-mails without feeling that they have to be in front of a PC, for example.

Continued

612.4 Generational issues at work

You should always make sure that each generation feels valued. Look out for your own subcon-

scious biases in soliciting input, making assignments, and such. Go out of your way to ensure that

everyone feels included. Also, just because someone works in a different manner than how you work

doesn’t mean their way is wrong. Be open-minded about new ways of working and doing things, which

includes embracing but not forcing technology.

The younger generations were brought up with technology. Older generations have certainly

learned technology and adapted to it, but not to the same extent or at the same pace. While the younger

ones are Tweeting, Facebooking, blogging, texting, and so on, the older generations may be a step or

two behind. Encourage the use of alternate solutions, but allow everyone to come up to speed with it at a

pace they are comfortable with. This also means that you as a manager should not limit your modes of

communications. While the older generations may prefer face-to-face chats, your younger generations

may prefer instant messages or text messages (perhaps at 2 AM on a Sunday!).

Finally, work with your HR department to help ensure that the entire organization is recognizing the

multigenerational issue and addressing it carefully. Does the break room have beverages and snacks

that appeal to all generations? One good example is employee benefit plans: different generations gen-

erally have very different priorities and those can be addressed through different options and choices.

Note that when we say “experienced” and “relative newbie” workers, we mean “individuals who

have more and less than (respectively) approximately 10 years of corporate experience.” Of course the

number varies from industry to industry, and organization to organization, but in general, we are re-

ferring to the amount of time an individual has spent in a formal organizational setting.

Your job as a manager—regardless of whether you are young or old yourself—is to make sure that

every member of your team understands the importance of communication: not only communicating

with people in other time zones and cubicle farms across the company, but listening and speaking to

people right in front of you. This can be startling news to some workers. The importance of commu-

nications has been discussed throughout this chapter—and for good reason. In addition to communi-

cations, being flexible, avoiding stereotypes, and encouraging collaboration can help to minimize the

generation gaps. The best teams, of course, have the energy of youth and the wisdom of age.

Table 2.5 Advantages and Disadvantages of Experienced Workers and “Newbie” Workers—Cont’d

Some Strengths of Experienced Workers Some Strengths of “Newbie” Workers

New technologies are often little more than variations on old technologies, and having someone who has already climbed the steepest parts of the learning curve can be a distinct advantage.

Relative newbie workers have spirit and energy and zip—and they know almost everything! Of course, they don’t know almost everything, but they think they know almost everything, which sometimes can be a great advantage.

They have perspective. They have the background of having lived and worked through huge problems, such as national recessions, complete company backup failures, and having the corporation bought out, as well as smaller issues, such as new product rollouts.

IT projects are often complex endeavors that get people down; they take a long time to start, take a lot of energy to maintain, and the end can seem unattainable. Relative newbie workers often add the blind enthusiasm necessary to get over the last 20 yards to the finish line. They don’t know that failure is an option so they work over the weekend and get all of the new servers installed.

62 CHAPTER 2 Managing Your IT Team

2.5 Further References Websites www.accenture.com/SiteCollectionDocuments/PDF/global_millennial_generation_research.pdf (genera-

tional

issues at work).

www.amanet.org (American Management Association). www.changingminds.org/disciplines/leadership/articles/manager_leader.htm (leadership vs. management). www.humanresources.about.com/od/360feedback/360_Degree_Feedback_Process.htm (360 reviews). www.managementhelp.org (Free management library). www.microsoft.com/presspass/download/features/2011/05-18Remote.pptx (report on U.S. telework trends). www.roberthalf.us/workplaceredefined (generational issues at work). www.teleworkresearchnetwork.com/costs-benefits (telework programs). www.trwib.org/agingtoolkit/documents/Multigenerational%20Diversity%20in%20U.S.%20Workplaces

%20Eliminating%20I.pdf. www.worldatwork.org/waw/adimComment?id¼48318 (telework programs).

Books and Articles Bacal, R., 2008. How to Manage Performance: 24 Lessons to Improving Performance. McGraw-Hill.

Casselberry, R., 2008. 30 Skills Every IT Person Needs. InfoWorld August 13.

Eisner, S., 2005. Managing Generation Y. Society for Advancement Management, International Conference.

Greengard, S., 2011. Managing a Multigenerational Workforce. CIO Insight Magazine May/June.

2011. Harvard Business Review’s 10 Must Reads on Managing People. Harvard Business Press.

Jaffe, B.D., 1998. Following a Few Simple Rules Can Ease the Pain of Employee Reviews. InfoWorld January 26.

Jenkins, T., 2010. A Commonsense Approach to Dealing with People: Managing People Made Easier. iUniverse.

Kluger, J., 2009. Why Bosses Tend to Be Blowhards. Time Magazine March 2.

Kotter, J.P., 1990. A Force for Change: How Leadership Differs from Management. Free Press.

Kouzes, J.M., Posner, B.Z., 2008. The Leadership Challenge. Jossey-Bass.

Lancaster, L.C., Stillman, D., 2002. When Generations Collide: Who They Are, Why They Clash, How to Solve

the Generational Puzzle at Work. HarperCollins.

Nazarian, A., 2010. Technical Minds: Leading and Getting the Best Work from Your Technically-Minded Team.

CreateSpace.

Orrell, L., 2008. Millennials Incorporated. Wyatt-MacKenzie.

Richards, T., 2010. Self-Confidence. . .for Managing People at Work. Outskirts Press. Society for Human Resource Management, 2005. Generational Differences Survey Report.

Tulgan, B., 2009. Not Everyone Gets a Trophy: How to Manage Generation Y. Jossey-Bass.

Violino, B., 2011. Workers without Borders. Baseline Magazine July/August.

Waxer, C., 2009. Clash of the Generations. Computerworld February 16.

Zemnke, R., Raines, C., Filipzcak, B., 2000. Generations at Work: Managing the Clash of Veterans, Boomers,

X-ers, and Nexers. American Management Association.

632.5 Further references

CHAPTER

Staffing Your IT Team 3 The key for us, number one, has always been hiring very smart people.

Bill Gates

CHAPTER TABLE OF CONTENTS

3.1 Why IT Managers Need to Deal with Hiring People............................................................................65

3.2 Write a Position Description ............................................................................................................74

3.3 Recruiters.......................................................................................................................................79

3.4 Selecting Candidates.......................................................................................................................83

3.5 Further References ........................................................................................................................101

Your success or failure as an ITManager is based almost entirely on the people that work for you. Every

time you hire a new employee, you have an opportunity to add value to your team, to your company as a

whole, and to adjust the balance of skill sets and personality of the team. Therefore, each hire should

have your full attention and not be dismissed as another administrative chore. This chapter discusses

the important details associated with the various elements involved in hiring for your team.

Hiring a few years ago was difficult because there weren’t enough well-qualified candidates avail-

able for the open positions. More recently, hiring has been difficult because there are now too many

well-qualified candidates. The reasons will change, but the difficulty—and importance—of hiring the

right people for the right jobs will never change.

3.1 WHY IT MANAGERS NEED TO DEAL WITH HIRING PEOPLE You need to deal with hiring carefully because the people on your staff are the single biggest factor in

determining whether you’re going to be successful at your job.

Hiring means dealing with recruiting agencies and your Human Resources (HR) department,

reviewing résumés, conducting interviews, and negotiating offers. If you secretly wish that the first

candidate youmeet is the one and you’re glad your job isn’t in personnel, don’t worry: you’re not alone. That means you feel the same way as every other IT Manager.

It’s precisely this urge to “hire first, ask questions later,” however, that can easily lead to a decision

that you and your company will come to regret. This chapter details some of the issues to watch out for,

the questions to ask (both of yourself and interviewees), and other issues you should be concerned about

when considering bringing someone new onto your team.

IT Manager’s Handbook.

© 2012 William Holtsnider & Brian D. Jaffe. Published by Elsevier, Inc. All rights reserved. 65

Human Resources Department’s Role Because recruiting for an IT position usually involves dealing with a lot of technical terms, skills, and

résumés with acronyms and buzzwords, many HR departments that normally lead recruiting efforts for

all other departments will take a back seat and let you drive when it comes to IT recruiting. But just

because you are driving does not mean they can’t help with the logistics of the process. Talk to HR and

discuss the following:

• Is there an approved list of recruiters to use? What is the company’s policy on their fees? • Can you find and use your own recruiters? • Who is responsible for placing ads on websites? Who pays for the ads? • Is there a careers section on the company website or a mechanism for alerting employees at sub-

sidiaries and sister companies?

• Will HR perform the initial screening of applicants’ résumés?

• Will someone (either you or HR) use social networking tools like LinkedIn to proactively go out and

find possible candidates?

• Who evaluates the salary range for this position and what is the evaluation process? • Who should be the internal point of contact for agencies and applicants? • Who does background and reference checks? • What is the time frame for the process?

• Who is in charge of the process?

As stated earlier, many HR departments recognize that IT recruiting is a special skill and one that they

might not be particularly good at. Accordingly, they may ask you to take as large a role as possible.

If this is the case in your company (and don’t assume it is), HR may only want to get involved during

the initial screening process, help you with scheduling interviews, and then help at the end with

background checks and offer letters.

How to Get Help with Your Hiring If you’re working for a small company, you’ll probably have to assume some HR duties, just like you

have to assume some administrative, accounting, or travel duties. But once the company reaches a cer-

tain size, it should get someone to help with the hiring duties. They don’t have to take care of all the

hiring, but they certainly can help.

In particular, you can get the HR department to help you with the screening and recruiting

processes:

• Once you have written the position description (see the section “Write a Position Description” later in this chapter on page 74), they can post it for you. They can work with you to figure out where the position should be posted—general job sites, industry-specific sites, etc.

• Have them identify someone in their department as a contact point. Let them field the initial calls

and e-mails. Have them narrow the initial responses (which can be in the hundreds, even for spe-

cifically worded technical jobs) down to a manageable size. Give them strict guidelines (“The can-

didate must have 5 years of programming experience and must know at least Perl, Cþþ, and Java”) to use to perform the initial screening. Give them a number: you want to look at 15 résumés max and talk to five candidates max.

66 CHAPTER 3 Staffing Your IT Team

• If the job requires writing skills, HR can ask for writing samples.

• If interpersonal skills are important, HR can save you valuable time by eliminating those candidates

who are simply poor communicators, or don’t take pride in their appearance, etc. The buzz word is

“client-facing,” as in: “This position is client-facing; its primarily role is to interact with executives

and support their use of technology.” For this position, the company (and the department) needs to

be represented by a professional-looking individual. Some companies will also refer to this as an

individual’s “presentation.”

• Once you have done the interviewing and chosen the candidate you like, hand the ball back to HR.

They can call the candidate’s references and draw up the offer letter. Finally, you or HR can make

sure there is a place for the candidate when he first arrives, that he has work to do, is introduced to

his coworkers, and also that the associated new-hire materials (such as the benefits package and

company policies) are covered. • Your HR representative can also be an effective liaison between you and the candidate when

the offer is extended and/or negotiated. They have the experience to know how to handle these

situations, how to respond, etc. They will check with you before committing to anything and offer

you guidance.

Justifying a Hire Before you hire someone, though, you may need to get approvals to do so. Whether it is simply re-

placing someone who recently left or adding to staff, you may need to convince others that this hire

is necessary. If it’s a new position, you’ll have to explain why this role is needed and what benefit it will

deliver. Sometimes the position description (discussed later in this chapter) has enough information;

other times you may need to go into more detail. Some examples of justification include:

• The department’s workload has grown by X percent in the past year, and additional staff is

needed to keep up. Sometimes you can justify the workload with metrics such as the number of

calls to the Help Desk, number of new projects, and the company’s growth. Also, consider losses

due to previous downsizing (the “falling further behind” syndrome). • The department has brought in new technologies and you need to hire people who are already

skilled and experienced in order to use the product effectively. However, be careful with this as

it is often said that it is cheaper to train an existing employee than to recruit a new one.

• The company can save time and money if certain processes are automated, but you need staff to

implement and support this.

• You will be able to respond to your users/customers X percent faster if you expand your staff. • The company has decided on an initiative (e.g., a new major application, or expanding into new

markets) and expanding technology is a critical factor for success.

Be as specific as you can with your estimates, but also note that they are only estimates. No one expects

you to be able to determine to the dollar or to the hour howmuch savings or productivity improvement a

new hire will generate so note that these are your estimates. But use numbers in your request. Numbers

represent facts, and presenting facts is better than presenting an opinion—don’t just say “it would be

good to get another guy.” Plus, you don’t want to be perceived as an “empire-building” manager who

thinks he can increase his own status (or boosting his own ego) simply by managing a larger staff.

673.1 Why IT Managers need to deal with hiring people

IDEAS FOR MANAGING IN TOUGH TIMES

Justifying a new hire was never easy, but it has gotten radically more difficult over the last couple of years due to the global economic downturn. Here are some things to keep in mind before you ever start to seek approval for a new hire.

• Decide if you want to hire a full-time person or a contractor. This issue is discussed more fully in the section “Should You Hire a Full-Time Employee or a Consultant?” later in this chapter. Because companies have become more and more resistant to the idea of bringing someone on full time, if a contractor can fill the need you will generally have an easier time justifying the expense.

• Be ready with the answer if you are asked if this job function can be outsourced—either to a company specializing in this function or to a resource/location that can perform the job for less money. Outsourcing has serious benefits and liabilities (discussed in Chapter 6, Managing the Money on page 161), but be ready with both when you are asked, as you most assuredly will be asked.

• Be ready to explain why no one else in the company cannot perform this function already. (See the next section “Start with Internal and External Referrals.”) You may have already run through the potential candidates in your head and dismissed each one, but that kind of quick analysis might fail you in the heat of a job-justification conversation. Be ready with specifics.

Start with Internal and External Referrals Looking inside is the best method to start your search for a candidate. Does anyone in your department/

company/personal network know of a candidate who matches your criteria? Coworkers, other man-

agers, and internal job-posting boards all can provide valuable names. You should always start here. The quality of people you contact through these referrals is generally higher and the candidates

are generally better suited for the position. Most people are conscious of putting their reputation on

the line when recommending another person and will do so only if they have some level of confidence

that the person merits the recommendation.

Be sure you don’t make any promises though. Ask everyone if they know of someone, but be careful

not to make any assurances up front. The most you should promise is that you’ll look at their résumé or

that you’ll make sure the right person looks at the résumé. Some internal referrals can be radically mis-

matched (“I thought you said you were looking for a Cþþ programmer, not a Web development per- son”). Aside from the occasional courtesy interview, you shouldn’t waste your time, or theirs, by

interviewing candidates who are never going to get the job.

Of course, make sure the candidate is treated with respect. If they’re referred to you and aren’t right

for the position, make sure they’re contacted with that information. You want to be able to reuse your

internal contacts, and leaving their recommendations in limbo is a good way to make sure they don’t

help you next time.

You can go further than looking at their résumé if that is called for. Often called “courtesy inter-

views,” these are interviews with a candidate that you perform as a favor to someone. If the CEO calls

and asks you to hire his nephew, you can certainly agree to talk to him. Not necessarily hire the person, but you can talk to them.

Internal versus External Hires An internal hire is when someone from within the company, or perhaps even from within your own

department, is selected for an opening. In some cases it might be a promotion, and in other cases it

might just be a lateral change. Hiring individuals from within your own department or your own

68 CHAPTER 3 Staffing Your IT Team

company presents its own challenges. Like many other issues dealt with in this book, there are good and

bad reasons for hiring inside (see Table 3.1).

THE FOUR C’S OF INTERNAL VERSUS EXTERNAL HIRES

When considering whether to hire an external vs. internal hire, your assessment regimen is as critical as any other step in the new hire process. Following the four C’s can provide a guide to making a more informed decision:

• Circumstance: What are your needs? Do you require a short-term win or can you afford to wait a little longer for someone to get up to speed? Consider specific vs. general, strategic vs. tactical, etc.

• Cost factors: We know the expense tied to hiring new employees, but what about calculating your opportunity costs—the cost of choosing one candidate over another?

Continued

Table 3.1 Pros and Cons of Internal Hires

PRO CON

The candidate is known. Her strengths and weaknesses have been seen by other people you work with so there shouldn’t be many surprises.

Hiring an internal person may anger other people you work with. If the person has talent and is a contributor to his group, his boss may be reluctant (or downright furious at the idea) at one of their workers transferring within the company. For personal reasons, many managers are angrier at a worker transferring to another department or division than they are at a person leaving the company altogether. It doesn’t make a lot of sense (a lost worker is a lost worker, and going to another department still might benefit the previousmanager in some small ways), but it’s a fact. Try to determine what the reaction of the manager of the candidate you are interested in will be before you start talking to people. This can range from a simple and casual request at a meeting you are both attending to a formal, preinterview notification.

Many companies aggressively promote the concept of hiring/promoting from within so you can get some kudos from upper management for adding to the company’s internal hire list.

People who have worked for the company for a while know “where all the bodies are buried.” They arrive with many preconceived ideas—maybe even some about your department. New people to the company generally come with their eyes and ears open, ready to absorb and learn. Some internal people arrive like that, whereas others arrive with many hard-to-shake prejudices.

Other employees will appreciate seeing that there is an opportunity to move up. Too often, staff members leave a company simply because they don’t believe they see much opportunity for their own growth. There will be a radically shorter introduction term; the candidate knows how the company works, is familiar with the organization, terms, and processes and can start being productive much sooner.

693.1 Why IT Managers need to deal with hiring people

THE FOUR C’S OF INTERNAL VERSUS EXTERNAL HIRES—Cont’d

• Chemistry: Will your team like him or her? How will morale be affected? It is difficult to predict how a person will mesh with others, yet it can significantly alter the effectiveness of a team. To that end, I would always have the managers on my team (with strong personnel evaluation skills) interview all candidates.

• Continuity:How long will you need this person? If you get a superstar, don’t expect to hang on to them too long and if you get a dud you might end up having to manage them out sooner than later.

I hired five newmanagers over a two-year span (due to rapid department growth), which gaveme a unique perspective on internal vs. external hires. Two were hired from the outside, while three were promoted from within. These were managers who would need to possess a range of experience in managing people and in understanding the financial sector, as well as the ability to grasp both branded and proprietary systems and technology.

External The External hire will have a steeper learning curve while the Internal candidate will typically enjoy a shorter time to get “up to speed.” Oftentimes the reason for going

outside is the need for more experience. The second y axis plots “Experience” and one can see the trade-off (gap)

between a quick learner vs. what an outsider might bring to the table, even early on in the assimilation process.

External vs. Internal Hires: The Experience Gap

Internal

Learning / Knowledge

T im

e E xp

er ie

n ce

Experience gap

There were significant learnings from this (real life) exercise, which I apply to each and every hiring situation I encounter. In the end, the two external hires were successful and stayed well after I moved on while two of the three internals became protégés, one eventually succeedingme in the position (the third was a dud, proving you can’t nail it every time, despite a rigorous hiring gauntlet!).

There is no magical formula that will tell you whether to promote the familiar (internal) candidate vs. bringing in a veteran (external); however, it’s a safe bet that with strong due diligence you can rest easier knowing you did your homework.

—Tim Holtsnider Project Manager, Global Customer Service Business Integration

Monster, Inc.

Should You Hire a Full-Time Employee or a Consultant? The answer, of course, is “it depends.” It depends on what your needs are. Both types of staff have their

strengths and weaknesses.

Full-time employees are individuals who work for your organization. Some are paid by the hour and some are salaried, but in either case, they are hired by, paid by, and report to someone in the organi-

zation. In addition to salaries, full-time employees receive additional benefits that can take the form of

health insurance coverage, vacation time, retirement plans, etc. To your Finance and HR people, these

individuals are sometimes referred to as W-2s because they get a W-2 tax form at the end of the year.

Most full-time employees are hired on an “at-will” basis, which means that either the employee or

the company can terminate the arrangement at any point for any nondiscriminatory reason. However,

70 CHAPTER 3 Staffing Your IT Team

this can vary from state to state, and certainly country to country. Regardless, your Legal and HR de-

partments will probably insist on sufficient reasons and due process, though, if you’re the one looking

to end someone’s employment. The alternative to at-will employment is when an employment agree-

ment/contract is signed by both employee and employer.

Consultants (also referred to as contractors), however, are brought in on a temporary basis by com- panies. They’re generally paid by the hour or day, receive no benefits, and aren’t on the company’s

payroll. They aren’t employees of your organization and are often responsible for handling not only

their own benefits and insurance, but also their own taxes. You may find an independent contractor

through an agency or consulting firm or you may find them directly through Web searches or personal

referrals. Online job sites are popular methods of finding qualified contractors. These individuals are

often referred to as 1099s because instead of receiving a W-2 tax form, they get a 1099 tax form (either

from your company or their agency).

Which type of employee should you hire? See Tables 3.2 and 3.3 for the pros and cons of full-time

employees and consultants.

Along those lines, it is important to note that IT is a strenuous world and that IT projects are often

complex, multi-person, multi-year adventures. You’ll need to get buy-in from everyone on your team

for many of the issues you address; contractors may or may not be there for you in the crunch.

Determine Which Type Is Best for Your Job To best determine whether you should hire a consultant or a full-time employee, think about why

you’re seeking new staff. Do you need someone for a few months in an area of technology that your

team has no expertise in and probably won’t need in the future? If so, you should hire a contractor. Do

you need someone to fill a gaping hole in your team or replace an employee who is leaving? If so, you

should hire a full-time employee.

Financial considerations may also play a role here. Not only does the actual cost enter into it, but, as

mentioned before, sometimes an organization doesn’t want to add head count, and would prefer you

bring someone in as a consultant instead of as a full-time employee.

Consultant or Employee: You Can’t Have It Both Ways Regardless of whether you decide to hire an independent contractor or a full-time employee, make

that determination before you open the req. In the past, several companies have tried to have it both ways. That is, even though individuals were brought on as contractors, the employer was es-

sentially treating them as full-time employees. These companies have lost lawsuits as a result of

this kind of situation. As such, the individuals were entitled to those things that true full-time em-

ployees enjoy, like participating in stock purchase plans (www.bizjournals.com/seattle/stories/ 2000/12/11/daily7.html).

Worker status is a tricky issue with many potential legal ramifications. If you have any concerns

about the status of your workers or potential employees, take them up with your HR and Legal depart-

ments as soon as possible.

Timing Considerations The circumstances and requirements of the hire will often help you with this decision; if you’re looking

to fill an entry-level position, the spring is a good time to get this semester’s graduates. And if your

company follows the academic calendar (for example, textbook publishing and school supplies

713.1 Why IT Managers need to deal with hiring people

Table 3.2 Pros and Cons to Using Consultants

PRO CON

In general, contractors may have more diverse experience. You can find independent contractors with backgrounds in most, if not all, of the obscure corners of technology. Because they aren’t locked to one desk and to one organization, they’re free to roam and learn what new projects and new companies can teach them.

Consultants often cost more than full-time employees. Even counting benefits, etc., that a full- time person is paid, contractors can easily cost you more. This is particularly the case if the contractor is hired through an agency, as the pay rate will include the agency’s markup. (Contractors have to pay their own Social Security taxes, among other things, so their rates will generally be higher than a full-time person’s wages.)

Because contractors often have such varied expertise, they usually require little or no training to become productive. You can see results from contractors in a relatively short amount of time.

If you hire a consultant, for budgeting purposes you will need to estimate how long the contract will be. This is sometimes very hard to do; if you are finishing off a companywide operating system upgrade, you know (roughly) howmanymachines are involved, how long it will take to do each one, etc. But if you are helping the Development team implement a new Accounts Receivable system, there are many variables that affect the outcome. That process could take anywhere from a few months to much longer, and sometimes factors nowhere near your control can influence that figure.

Consultants don’t add to head count. When companies are trying to save money, it looks poorly if they are adding to staff. Although the actual costs may be more expensive, upper management and the Finance department frequently would rather pay a contractor as opposed to increasing the employee head count.

It is easy (and potentially disastrous) to forget that contractors aren’t employees of your company: Their loyalty, in the end, is to themselves. This isn’t to say contractors do a poor job; some do spectacular jobs (while others don’t, of course). But they care about getting paid and recording hours; their interest in the long-term growth of your department or your company isn’t all that high. If a contractor feels that he may not have much of a future with your company, he may start looking for a more reliable revenue stream, and possibly leave you at his convenience, not yours.

Consultants can usually be dedicated to a particular project, whereas full-time employees have many other responsibilities.

You can terminate a contractor quickly and easily when you need to. Sometimes this is the most significant benefit of a consultant. This might be because the need for the contractor is for a specific time period, or because you want to be able to end the relationship easily (without interference fromHR) if the person doesn’t work out. Various states have various laws about what you must do in those situations. (And the laws for these kinds of actions vary radically overseas.) While professional courtesy says you should give at least two weeks’ notice when terminating a full-time person, in general, you can fire a contractor the same day.

72 CHAPTER 3 Staffing Your IT Team

companies), you’ll be on a more defined schedule. Summertime (due to vacations) and the holiday

period at the end of the year are generally quieter times for staffing. This is because people aren’t gen-

erally looking to make potentially career- or life-altering changes during these times. Similarly, at the

end of the year, some companies will defer all hiring until the following year, simply for the benefit of

making this year’s financial numbers look better.

When is the best time to hire? The correct answer to this question is at least one month before you need to hire. Hiring people takes time, often more time than you expect, and it’s not a decision you should leave until the last minute.

How long before this employee is producing? Bringing people up to speed takes time, too. Since

you brought them on because they had a specific skill set that you needed, contractors often need less

training than full-time employees. (You should think twice about paying for a contractor’s training

expenses. It happens, but it should be when you’ve exhausted all other options.)

Full-time employees that you have hired may or may not have the specific skill sets you need.

Regardless, everyone needs some time to get acclimated. In addition to the logistical issues involved

(the person needs a desk, a computer, a network ID, e-mail account, etc.), you need to plan for time

for employees to get settled. And don’t forget that their coworkers need to adjust to a new team

member, too.

Table 3.3 Pros and Cons to Using Full-Time Employees

PRO CON

In general, full-time employees are more committed. They’re more loyal to your organization because they have a vested interest in its success. They have a better understanding of the context of the work they’re doing; they remember the project when it was done five years ago, and they understand why this particular VP’s needs are being given priority.

Full-timers can sometimes be less deadline driven. They know there is always tomorrow, and many aren’t shy about reminding you. Many full-time employees are dedicated, hard-driving workers, but some are not.

Full-time employees are cheaper in the short term. When you calculate the cost of a worker, you need to include the benefits the employee receives, the cost of office space, etc. But in the short term, even the total of these costs can be less than a pricey consultant.

Terminating full-time employees is much more complicated than terminating contractors. There are many laws and policies surrounding the termination of a full-time employee, and this is one area where you are much better off having your HR department deal with the issue.

Sometimes, full-time employees are better suited for the specific task at hand. Sometimes the learning curve for a consultant can be severe, whereas a full-time employee brings critical legacy knowledge about the processes, people, and organization that can radically affect the time it takes to complete that process. It may be wiser to get an employee up and trained about a new technology, rather than to try to get a contractor fully versed in the organization and processes of your company.

733.1 Why IT Managers need to deal with hiring people

WHY DO SOME ORGANIZATIONS REFUSE TO INCREASE FULL-TIME HEAD COUNT?

There are reasons why a company may not want to increase its full-time head count that, strangely enough, have nothing to do with money.

• Official Size Limits. Companies may want to stay a certain size to qualify for specific government contracts. There is a 500-employee limit, for example, to qualify as a small business in certain industries (www.sba.gov/content/ determining-size-standards). Hiring consultants or part-time employees does not affect this limit, but hiring full-time employees does.

• BusinessModel.Some companies are littlemore thanmiddlemen, facilitating the flow of business from one sector to another, from one group of companies to another. (eBay is a such a company.) Companies like this grow or shrink quickly based on their immediate needs; they want to remain very flexible and not be burdened with a lot of overhead. Not only do they not hire full-time workers, they often lease office space on a very short-term basis.

• Impressing Investors. When times are tough, investors like to see a company reducing costs, and that includes staff reductions. Nonetheless, it is all too common to see individuals laid off as employees, only to be brought back very quietly as consultants.

• Nature of the Market They Are in. One author calls it the “Ben and Jerry’s vs. Amazon” model. Does your company operate in a market with lots of well-established competitors (like Ben and Jerry’s)? If so, slow, organic growth may be your best method of succeeding. On the other hand, if your company enters a new field (like Amazon was doing when it started), getting as much market share as soon as possible may be the best way to approach things. (Venture capitalists sometimes call this the “First In Wins” type of market.) In that case, adding as many employees as soon as possible may be required.

• Seasonal Impact. Many industries are directly impacted by the calendar. Retailers are busiest in December, beach resorts are busiest in the summer, ski resorts are busiest in winter, and florists have peaks around key holidays. In cases like these, it may not make sense to bring on full-time employees for jobs that may last only a few months.

3.2 WRITE A POSITION DESCRIPTION Most likely you’re going to have to prepare a Position Description (PD), sometimes called a Job

Description (JD). A PD is a relatively detailed description of a specific role.

Your HR department may ask you to write a PD so that it can be posted internally within the com-

pany or it may be used to relay the pertinent details to agencies and recruiters. HR may also use the

information in PDs to help prepare an ad for the newspaper or for a job-posting site. HR often insists

that every employee have a PD so that every individual’s responsibilities, accountabilities, and so on

are clearly spelled out. In many organizations, the content of the PD is the basis for determining the

grade, title, salary range, bonus eligibility, and so on for a position.

Even if you aren’t required by your company’s procedures to prepare a PD for the hiring process,

it’s a good idea to do so. Every member of your staff should have a PD of their own job. That way, there

is little doubt as to what their responsibilities are.

A PD can also be used for performance evaluations, salary considerations, and staffing justification.

If an employee becomes a problem employee, it’s good to have a hard-and-fast description of what their

official duties are supposed to be. HR can use this information to help resolve difficult personal

situations.

74 CHAPTER 3 Staffing Your IT Team

Position Descriptions versus Contracts Along these lines, it’s important to remember that the PD is just that—a description. It is not a contract. There are several reasons this distinction is important, but the most important ones are:

• Many companies have formal contracts with some of their employees (particularly at the senior

levels), and a PD is not designed for that purpose. Some companies have formal, legal contracts

that they require employees to sign upon joining the organization. These contracts are generally

strong legal instruments with very specific terms. They aren’t good methods for determining what

a person should do; they are often a list of things a person should not do (such as using company

resources for personal needs, or revealing confidential information). A PD doesn’t serve this legal

function.

• Goals, responsibilities, and expectations are things that should be listed in a PD. These aren’t legally

enforceable items, but nonetheless are critical components of the position.

• Things change. Although your staff may or may not appreciate change, it’s still incumbent on you as

a manager to maintain your flexibility. Your boss will demand a wide variety of things from you,

often adding or subtracting duties the same week. You’ll need to adapt quickly to those new chal-

lenges and be able to turn your staff in the new direction. A PD that details exactly what an IT pro-

fessional can do severely limits that individual’s flexibility and radically constrains the manager

and the department. You want the PD to be general enough to cover all aspects of the job.

(You don’t want to be in the position of assigning someone a task and hearing them say “that’s

not in my job description.”)

The format of the PD can vary. Your HR department may have a standard format that it likes to use. It’s

often similar to an outline and is usually kept to one or two pages.

General Requirements While PDs vary from company to company, there are many similarities. The following are common

elements of a PD (see Figure 3.1):

• Job title. The title should be descriptive about the job and also be one that an employee will be proud to have on his business card. Something along the lines of “IT Associate II” has little mean-

ing; “Senior Software Developer” is better. Use industry standard titles and descriptions so that both

you and the potential employees can readily do comparisons of qualifications versus salary and

benefits.

• Position summary. A high-level, two- or three-sentence description of what the job entails. • Scope of responsibility. This provides more detail about the job. It may cover the number or types

of systems, requirements for being on call, budgeting responsibilities, personnel responsibilities

(hiring, management, performance reviews, etc.), requirements for doing high-level presentations

or low-level documentation, etc. This section usually has the most information about the job and

what is expected of the employee. • Immediate supervisor or manager. Identify the title of the individual the person will be reporting

to. This will help give some perspective to where the position is in relationship to the entire IT

organization.

753.2 Write a position description

• Number of direct reports. Indicate the size of the staff that reports to this position. It might even help if you provide some simple description of the staff (operators, programmers, other managers, etc.).

• Minimum versus specific requirements. For all critical issues, list the minimum requirements (and name them as such), as well as any specific requirements. If you must have a programmer with

at least three years of development experience, say so clearly. If you need someone with SAP in

their background, be clear about that.

• Education, training, and certification requirements. If these are a requirement for the job, spec- ify what they are.

• Experience required. If formal training isn’t required, companies often ask for a minimum number of years of “real-world” similar experience in a given field. Sometimes you may want to identify the

type of experience that is required. For example, you may want someone with experience in a sim-

ilar industry or with very large organizations.

Job title: Senior Java Developer

Position summary: Writes application code for company’s commercial Web site

Scope of responsibility: Work with systems analysts, customer service, and marketing teams to develop and maintain code for company’s e-commerce Web site. Will be responsible for developing, testing, documenting and maintaining code in an environment consisting of approximately 30 systems with 100 modules, 50 servers, two data centers, and receiving approximately 200,000 hits per day. Employee will participate in a rotating on-call schedule to insure that systems are available and reliable on a 24/7/365 basis.

Immediate supervisor: Robert Smith, Manager of E-commerce Development

Number of direct reports: None

Travel: 10–15% travel required

Specific requirements: Minimum 3 years Java development, 10+years development in another language (C, C++, Perl, SQL)

Education: Four year college degree preferred

Experience required: Minimum 1 year experience in supporting a high-volume retail e-commerce site.

Salary: $75,000–$95,000

FIGURE 3.1

Sample position description.

76 CHAPTER 3 Staffing Your IT Team

• Travel. If there is travel required in the position, it’s important that it be identified. Traditionally, it’s identified as a percentage of time. It’s important to be as honest here as possible. Since most

candidates look negatively on travel requirements, you might want to be extra careful and overes-

timate the amount of travel. Youmay also want to describe the travel in more detail (local/domestic/

international, or short trips of two or three days vs. weeks or months at a time). • Salary. If you include a salary in a PD, give a range. If there is a bonus, simply say “bonus eligible.”

Advertising Options First, Post Internally In some companies, youmust post open positions internally first. Find out if your company requires you to do so or allows you to do so only if you wish. Typically HR feels that existing employees should have

the first shot at any new openings, and it is bad form for employees to find out about an opening through

external sources. And sometimes you may want to let people within your department know a job open-

ing is about to be created, but other times you may not want that information known until the last

minute. Whatever you do, don’t try and have it both ways; employees will find out that you are adver-

tising behind their backs and your reputation (deservedly) will suffer. In short, don’t advertise (inside or

out) until you’re ready for everyone to know about it.

Popular Websites There has been a tremendous shakeout in job sites, and after many sites merged, there are only a few left

standing. Monster.com, Dice.com, CareerBuildeer.com, and your local craigslist.org are the most popular. There are also site aggregators, such as Indeed.com and Jobster.com, that scour all of these

sites and consolidate the results. In general, job posting sites are free to the candidates, but require the

hiring firm to pay a fee to post the ad.

There are a small number of sites that also require the candidate to pay a fee, such as TheLadders

.com and ExecuNet.com. However, there is no consensus among either candidates or recruiters that

sites like these offer any real increased value.

In addition, social networking sites geared toward professionals, such as LinkedIn, have also be-

come very popular, not only for posting job ads, but for actively searching for candidates that meet your

criteria. In addition, websites for trade journals and professional associations very often have job

postings.

Web Posting Issue to Think About The good news is that your job will be shown to millions of people; the bad news is that your job will be

shown to millions of people. And most jobs in IT can’t be filled by millions of people.

Be prepared for a large number of responses. It sounds like a nice problem to have until it happens to

you. Online postings routinely generate hundreds of responses in the first few days—even if you have

the job sites filter the results.

Networking Filling a job via networking can be a very rewarding process. Start by talking to your professional con-

tacts (peers, subordinates, HR representatives, coworkers from former jobs, sales representatives,

contacts you meet at conferences and seminars). You don’t have to go into great detail, just briefly

mention the type of job you have open, along with a brief description of what you’re looking for.

773.2 Write a position description

Your network of contacts, though, extends far beyond the people you currently work with, as well as

those you used to work with. Some people are ferocious networkers, tracking every contact made at a

social setting in a complex database. You don’t have to be that person, but know that your range

of contacts is much larger than you might think; imagine talking to people at your church, or neighbors,

Little League coaches, people you meet at trade shows, and so on. A little word of mouth can go a

long way.

As mentioned before, social networking sites such as LinkedIn.com, Plaxo.com, ZoomInfo.com,

and Facebook.com have become valuable tools for developing networks and contacts for both job

seekers and job providers. A 2010 survey by Jobvite.com of HR and recruiting professionals

found that:

• 92 percent currently use or plan to recruit via social networks

• Of this group, 86 percent use LinkedIn, 60 percent use Facebook, and 50 percent use Twitter for

recruiting

• 50 percent of hiring companies plan to invest more in social recruiting, while only 17 percent will

spend more on job boards and 36 percent will spend less on job boards • 58 percent have successfully hired through a social networking site • Of those that have hired through social networking, 89 percent did hires from LinkedIn.com

(source: recruiting.jobvite.com/resources/social-recruiting-survey.php)

Professional Contacts • The HR department may have recently interviewed someone who was rejected for a position in

another department, but perhaps fits your requirements better.

• Members of your, or other, departments may know of people at their former jobs. • Your vendor representatives, who are probably already familiar with your environment, may know

individuals at their other customer sites who would be a good match. • Perhaps someone who was a close second for a previous open position can be called back in for this

position.

• Professional organizations that either you or one of your staff belong to can be a good resource.

• Local schools and universities may provide contacts.

Personal Contacts • People on your staff may have friends and colleagues who they can vouch for and know are looking

for jobs. This connection brings a real bonus:What higher compliment is there for you as a manager

than for one of your subordinates to recommend a friend to work for you?

• Your community can provide you with a rich source of potential job leads. Let the word get out to

your friends, to fellow community members, to neighbors, and to fellow squash players that you’re

looking to hire someone.

• For all you know, the next person you meet at a Fourth of July barbecue softball game could know

the ideal candidate for you.

Effectiveness of Networking Does networking work? It sure does. Does it work every time? No. It’s a matter of luck and timing, the

people you contact, and the way you talk about the job, as well as other factors that you can’t always

identify. You never know the chain of connections that will lead you to the right contact. In fact, one of

78 CHAPTER 3 Staffing Your IT Team

the coauthors found a job via someone he went to Sunday school with and hadn’t spoken to in over

15 years. One of the nice things about networking is that it can be the least expensive way to find can-

didates, but it may not be the fastest or most effective. However, you can always use networking in

conjunction with other recruiting methods.

Job/Recruiting Fairs The value of job fairs has always been debated but its value has radically diminished for IT jobs in these

everything-is-online days. There are job fairs that still work for some jobs, but in the relatively spe-

cialized world of IT, weeding candidates (and companies) online is much more efficient for both

parties. Some companies still attend job fairs, but these jobs in IT tend to be “client-facing”; that

is, there will be some contact with customers and companies want to see how potential employees pre-

sent themselves. There is also concern that job fairs are more likely to bring the more desperate can-

didates (i.e., those willing to wait in long lines) as opposed to the most qualified.

The (Limited) Value of Print Advertising The days of choosing one type of job ad over another are fading; newspapers, as part of their push

to move online, have partnered with job websites. Many newspapers are offering print as well as

online listings. Although print ads are a dying breed, they aren’t dead yet. Very senior positions still

often appear in “display ads” in the business section. Some companies choose to use print ads in addition to online ads, and some choose to use print instead of online, perhaps as a way of attempt- ing to reach a different demographic. As recently as 2011, one of the coauthors spotted an ad for a

CIO in the classified job section of the New York Times amidst several columns of IT job listings. Perhaps since the company was obviously looking for a seasoned executive, they thought that the

newspaper might be a more targeted medium (maybe assuming that the type of candidate they’re

looking for probably grew up in the days when newspapers were pretty much the only venue for job

advertisements). Or perhaps they were looking for a candidate who was thinking a bit outside the

usual box of job search methods.

3.3 RECRUITERS Whether you call them recruiters, agents, or headhunters, they are a fact of life in the modern corporate

hiring world. Recruiters generally don’t have a great reputation. Sometimes that poor reputation is

deserved; many other times, however, a recruiter can mean the difference between success and failure

of a project that is relying heavily on very specific types of employees. Using a recruiter has both

advantages and disadvantages. Weigh them carefully before deciding. The costs for making the wrong

choice can be high.

In truth, a recruiter is probably going to use some of the same methods (the Web, networking, etc.)

that are discussed in this chapter, which you could easily use yourself.

Another factor to consider is that recruiters’ roles have shrunk dramatically in direct relation to the

rise of job sites. The recruiting industry has also suffered from the recent economic downturn that saw

more layoffs than hires. Finding a candidate on Monster.com may be the right method for you, but

using an old-fashioned recruiter has some positives and negatives, too. Details for each option are

discussed in Table 3.4.

793.3 Recruiters

If a headhunter’s less-than-stellar reputation is deserved, the way in which they are compensated

may be one of the reasons. Agents generally receive up to 25 percent of the annual starting salary of the

person they place. With high commissions, coupled with weeks or months between placing a candidate

successfully, a headhunter has high incentives to do his best to succeed at every opportunity. However,

Table 3.4 Pros and Cons to Using a Recruiter

PRO CON

Recruiters take the lion’s share of the recruiting burden off of you. Your HR department may do nothing more than use one or two of the recruiting media mentioned earlier. The recruiter, however, will place the ads and work the phones. In addition, he’ll do the initial screening of candidates and résumés. He will make sure that the candidates he sends you are in the right salary and skill range. Recruiters will also meet candidates before sending them to you to be sure that they have the appropriate “presentation” for you. The last four sentences state what the recruiter “will do.” More appropriately, they ought to say “should do.” It’s the “wills” and “shoulds” that separate good recruiters from bad ones.

Some recruiters do not listen to you and your requirements. If they continually send you candidates and résumés that clearly aren’t suitable matches, change to another recruiter. This is a very common problem. Recruiters have bodies they want to place (and often take the view that if they throw enough things against the wall, the odds are that eventually something will stick), but that isn’t your problem. Demand what you are paying for. Some recruiters try to convince you to ignore your own instincts. If you reject an agent’s candidate, the recruiter should ask why so that he can learn what you don’t like and increase the odds of sending you people you will like. But if your agent tries to argue with you or convince you that you should consider someone you didn’t like, it’s time to move on. There are plenty of fish in this sea.

In large metropolitan areas where there is a large pool of talent, agents can help you separate the wheat from the chaff. In areaswhere the pool of talent isn’t quite so deep, a recruiter may be able to help you find the oasis in a desert. If your marketplace is a difficult one to recruit in, agents can help. For example, many downtown metropolitan areas have an intensely competitive hiring IT environment. Qualified IT professionals know they can find a job easily and are generally very savvy about doing so. Are you prepared to find the right avenues, investigate the common sources for this position, and so on by yourself?

Some recruiters try to increase the odds of success by overwhelming you with résumés. One of their primary functions is to separate the wheat from the chaff; if you aren’t saving time using a particular recruiter, switch. In general, working with agents is a mix of personalities—yours and theirs. And since you’re the one paying, you can, and should, choose not to work with those who don’t seem to work well with you.

Arecruiterhashisownnetworkandcontacts. Inaddition to posting adsonwebsites, an experiencedheadhunter will know lots of people. He will likely know people who may be interested in changing jobs, but who aren’t actively searching the job sites. This network will also help himmatchup the right personality andattitudewith the culture of your organization.

If the job you’re hiring for is a complex one with very specific requirements, a recruiter can take on the burden of finding those candidates. If the job you’re hiring for is a popular one, that a lot of people will be interested in applying for, a recruiter can help narrow down the field.

80 CHAPTER 3 Staffing Your IT Team

his definition of success may vary from yours. You want the best candidate, he wants you to hire any candidate—as long as it is his.

You should also talk to your HR department. There may be specific policies against using head-

hunters unless all other avenues have been exhausted or they may have negotiated rates with specific

recruiters that you can use. Many companies now have a short list of approved recruiters that every

hiring manager within the company must use.

WHAT RECRUITERS DO THESE DAYS IDEAS FOR MANAGING IN TOUGH TIMES

Some companies have adopted policies that forbid the use of recruiters. The reason for this policy is that senior executives imagine that the high fees that recruiters charge can be avoided by doing the work without them.

In some cases, that is certainly true. There are many candidates looking for jobs in challenging economic times. However, as discussed several times in this chapter, making a good hire is a series of steps in an often complex process, not just a matter of finding the right person.

However, like all other middlemen in a business process, the Internet has radically altered their business model. A recruiter whose value was based solely on “secret information” (which person was looking, what company was hiring) is probably out of business by now. Recruiters not only have to find the right candidate, they often have to vet that person (sometimes doing several prescreening interviews), coach the candidate before and after the interview process, negotiate with the company regarding short- and long-term compensation, and manage the candidate’s progress for a period of time.

Finding the Right Recruiter Finding good recruiters is more of an art than a science, but probably not terribly different from how

you found your accountant or dentist. You probably took a recommendation from a friend or relative

the first time you needed an accountant. Later, you may have changed accountants, perhaps based on

another recommendation, because you weren’t 100 percent comfortable with the first one. You may

have gone through a few options before finding one you’re comfortable with. In essence, you net-

worked. Finding a good agent to help you find a job or to help fill an open position is the same process.

You can start by asking people you know which headhunters they’ve used. Ask who they liked,

disliked, and why. Your company’s HR department can probably offer you some references of agents

they’ve worked with in the past, as well as those they’ve had bad experiences with. You can also ask

others in your department about agents they’ve used. If you really don’t know where to turn, you can

always look on the Web for local agencies; there are several large international recruiting agencies that

have offices in most major cities. Regardless of how you find them, be sure and check out their ref-

erences before you start using them.

You want to find agents you like working with. You may prefer agents who are fast paced or those

who are more laid back. Because they often conduct their business over the phone or via e-mail, it is

entirely possible that you may never meet some of the agents you work with. As such, you’ll have to

rely on your instincts to judge them as you work with them and speak to them on the phone. As com-

plicated as the world gets, and as competitive as recruiters are, it’s somewhat surprising to know that

many agreements with recruiters are done verbally. And, if you don’t meet them in person, you won’t

even have the proverbial handshake.

You may not even have to find recruiters, because they’ll often be looking for you. Headhunters

earn their keep by establishing contacts with hiring managers, companies, and candidates. Sooner

813.3 Recruiters

or later (probably sooner) they’ll learn that you’re a manager and that you have responsibility for staff-

ing. They may hear this from existing contacts they have (such as others at your company) or simple

cold calls to your switchboard (“Can you transfer me to the IT Manager?”). Once they establish a

beachhead, some resort to time-worn techniques such as bringing donuts to meetings to further cement

their hold in your department.

Technical Abilities Many recruiters don’t have the technical depth required to adequately help you with your search.

Recruiters are no different than the rest of the population in this regard: There are many people

who are very ignorant about technical matters, there are those who know enough “to be dangerous,”

and there are truly knowledgeable people. Your concern should be twofold: how much do they under-

stand and how honest are they about their abilities.

Remember that sometimes you will be trying to fill positions that require skill sets that are still being

developed. IT is a constantly changing industry. If you want to hire someone with word-processing

skills, those metrics are well defined. But you might be trying to find a .Net programmer or Flex

programmer. Those technologies are only a few years old.

This means youmay only find a few recruiters who understand your requirements. What you will be

looking for is a recruiter who is honest enough to admit what they don’t know and willing enough to

listen to you tell them what they need to know.

Things to Keep in Mind Some important things to remember when dealing with recruiters:

• Fees generally run up to 25 percent of the annual salary that is offered and are almost always

negotiable—in tough economic times, everything is negotiable. Agree on the fee up front and

preferably in writing. Include terms about when the fee is paid and what happens if the employee

is fired or quits soon after being hired. • Often a recruiter will ask what your company normally pays as a finder’s fee. If they do, this is a

great time to offer a lower number. Recruiters know that if you use them once, you may use them

again so they may be willing to give up a few percentage points in exchange for a potentially

lucrative long-term relationship.

• Headhunters’ fees are usually paid after a certain period of time. This is to ensure that the candidate

doesn’t quit or isn’t discovered to be a disaster immediately after being hired. Agents often request

their fees after 30 days. You can usually push that out to 60 or 90 days. Don’t pay the fee early based

on the promise that you’ll be credited with a refund if the new hire doesn’t work out before the

agreed-upon period.

Using Multiple Recruiters It’s quite common, and not considered unethical, to give the same assignment to multiple recruiters. As

long as you can deal with working with several agents, it will increase your odds of finding exactly the

right person. On the off chance that two recruiters send you the same candidate, the professional thing

to do is work with the recruiter who sent you the candidate first. (If there are two identical résumés in

your e-mail in-box, use the time stamp to tell you who sent it first.)

82 CHAPTER 3 Staffing Your IT Team

3.4 SELECTING CANDIDATES Whether candidates come to you via your own network, ads, recruiters, or Human Resources, now that

you have some possibilities, the next step is to evaluate them.

Reviewing Résumés Résumés come in all shapes and sizes, and there is no science to reviewing them well. What one man-

ager may consider a great résumé, another may dismiss immediately. A résumé that’s great for a pro-

grammer may not be great for a programmer/analyst. When candidates write résumés, they may

agonize over every word, phrase, and formatting choice. There are volumes on the subject of writing

résumés. This section, though, addresses the issue of reading résumés. Things to look out for when you read a résumé include:

• Be on the lookout for spelling and grammatical errors. Most people spend an enormous amount of

time getting their résumé just right (and having others review it), so any mistakes should have been

filtered out. If it contains a typo, it could mean the candidate isn’t focused on detail, or is cavalier

about things that most others take very seriously. These are traits you probably wouldn’t want in a

member of your team.

• Take note of the overall appearance. Does it seem well formatted or thrown together haphazardly?

This could be a reflection of the fact that the candidate thinks that things like appearance are

superficial. There are many résumé services and lots of easy-to-use résumé templates available

on the Web; no candidate these days should have an ugly resume.

• Look at the job history. Is the candidate a job hopper? Are there gaps that you want to ask about?

Some gaps are common—the dot-com bubble of 1999–2001, and the economic downturn of the late

2000s put many IT workers out of work. Also, many IT professionals have short or long stints as

contractors and work in brief, six-month assignments and then move on to the next company. How-

ever, while many managers will reject a job hopper, they may also be concerned about those who

have been in a job for an extended period of time. They may fear that a candidate with 15 years at his

current job has only one view of the world and may have difficulty adapting to a new job

environment.

• Does the level of detail in the résumé match what you’re looking for? For example, if the résumé

highlights that the candidate upgraded the operating system on a server, it may indicate he’s coming

from a much smaller environment compared to yours; you may have so many servers that an OS

upgrade is such a common practice that the task is barely mentioned among technicians, much less

seen as a résumé-worthy accomplishment.

• Does the résumé have a laundry list of technologies? For example, does it list every model of every

brand of workstation and server they ever worked with (e.g., IBM PC, XT, AT, Compaq Proliant

5000, 5000R, 5500, 5500R, 6000, 6500, 7000R) along with every version of every software pack-

age (e.g., Windows 2000, XP, 2003, 2008, Vista, 7)? You may see lists like this and think, “Is this

candidate really proficient in all these technologies?” You may also ask, “Why does he think I care

that he knows about technologies that were discontinued over 10 years ago?” • Notice factual claims. Résumé padding is very dangerous. (A CEO of Radio Shack resigned years

ago after it was discovered that he misrepresented his educational credentials.) Don’t be afraid to

ask direct questions about a candidate’s claims: Were there other people working on these websites

833.4 Selecting candidates

you designed or was it all your doing? Did you write most of the code for that billing system or were

you a member of a team?

Résumés are rarely read from top to bottom. Typically, they are glanced over quickly (various studies

show that the average résumé gets well under a minute’s attention). This glancing process allows the

manager to hunt for things that he’s looking for, as well as to see what else jumps out at him. These are

reasons why a well-formatted and carefully crafted résumé is so key.

Telephone Screening After screening résumés, but prior to face-to-face interviews, some managers like to do telephone

interviews to narrow down the list of candidates. A quick 5- to 10-minute telephone conversation

can reveal quite a bit. For the more hands-on and technical positions, you can use a few technical

questions to gauge a candidate’s level of expertise. Telephone screening is ideally suited for cus-

tomer service representatives such as Help Desk analysts, since it gives you some insight into their

telephone manner, their communication skills, and how their style is when interacting with cus-

tomers and users.

For the less technical and more supervisory positions, you still might be able to use a brief telephone

interview as a gauge to their interpersonal skills, especially if these skills are a critical part of the job

requirement. Of course, telephone screening just helps you narrow down the field, since you still need

to meet with those candidates that do well on the phone.

Often the Human Resources department will do the initial screening of candidates, pass 20 résumés

to the hiring manager, the manager will cut that number to 10, and then the résumés will be sent back to HR. They will then conduct a brief phone interview to further narrow down the candidates to a man-

ageable number of in-person interviews. This relatively convoluted process is justified when there are

many well-qualified applicants for an important position.

At What Level Should I Interview? If the position reports to one of your managers, consider having that manager do the first rounds of

interviewing. This saves your time and empowers your manager. If you have several levels of staff

reporting to you, you may not feel the need to be involved in the interviews for every position in your

organization. However, you should be involved in interviewing for:

• Positions that report directly to you

• Positions that report to your direct reports

• Positions in your organization that are highly visible or very critical

Even if you feel you don’t need to be involved in interviewing for a lower-level position, you may want

to at least meet briefly with finalists before offers are extended.

Narrowing Down the List Like many information-based activities the Internet has streamlined, searching for a job has been rad-

ically simplified. For just a few dollars, a job seeker can send out thousands of résumés. As such, hiring

managers like you are deluged with résumés. The pendulum swings back and forth from not enough

candidates to too many candidates. Having too many options may seem like a desirable problem to

have, but it’s a difficult issue in its own right.

84 CHAPTER 3 Staffing Your IT Team

How to Choose from Hundreds of Candidates First of all, get help. Ads posted on job sites often generate hundreds of responses. Of course, many are

completely mismatched to your posting, but someone has to weed through the electronic stack of files

(many named “resume.docx”, of course) to glean the real candidates from the wannabees. Sophisti-

cated résumé-scanning software (your HR department may already use this) can quickly scan hundreds

of résumés for specific keywords. Your internal recruiters and headhunters should also be helping you

narrow down the list so you don’t feel overwhelmed.

Get help from HR—fast. For details, see the section “Human Resources Department’s Role” earlier in the chapter on page 66. Some companies have résumé-screening software, special e-mail addresses, and third-party services to handle the first wave of responses. Give HR a list of specific

requirements for the position you’re looking for and a specific number of résumés you want to read:

“I would like to see 30 résumés of qualified candidates—no more.” If you receive fewer than five qual-

ified candidates in a hot market, then this is a problem that points to an issue with your advertising. Did

you use the right terms? Did you post in the right places? For more details about advertising, see the

section “Advertising Options” on page 77. If you receive several hundred résumés, you don’t have the time to give each one appropriate con-

sideration. To narrow down the pile, select a few criteria. Youmay want to eliminate those résumés that

don’t have a cover letter, drop those that are outside your geographic area (especially if you don’t plan

on paying to relocate someone, or don’t have a robust teleworking environment), or toss out those that

show a history of job hopping.

How to Choose from 30 Qualified Candidates Having narrowed the initial number of résumés from the hundreds down to 30, now you must use a

different set of skills to move from 30 to 5. (These numbers are approximate; decide which numbers

work for you.) Your goal is to narrow the number of résumés you are reading down to a manageable

number of candidates you can interview in person. As discussed before, sometimes a phone interview is

an ideal method for prescreening candidates.

While grateful for help from HR, you’ll probably review their selections next. You may have 30

“qualified” choices but five to 10 can be eliminated right away. You may not have specified it to HR,

for example, that the person can’t be entry level or must have hands-on programming experience (not

just classroom time).Whatever the reason, about one-third of your candidateswill probably fall to the side.

That still leaves you with 20 qualified candidates. In a hot market, it’s good to remember that many

candidates could fit the bill. Give yourself some room when making this decision: you aren’t trying to

find the perfect candidate (there may be five perfect candidates or, more likely, there won’t be any); you’re trying to hire a person who fits your requirements and your team well.

Choose five candidates to talk to in person, but keep the remaining 15 on hand just in case the first

round doesn’t work out.

Should You Hire an Overqualified Candidate? The two simple answers are:

• Yes, because in a hot market (for employers) you’ll get more for your money.

• No, because in a hot market (for employees) they’ll jump to another company as soon as they get an

offer that matches their skill set better.

853.4 Selecting candidates

Ask your HR department and fellow managers what their take is on the short-term prospects for the

hiring market.

Young managers (i.e., recently appointed managers, not youthful managers) should be very careful

about hiring overly qualified candidates. These individuals are often more challenging to manage; that

doesn’t mean they’re more difficult, it means they require special attention. They didn’t acquire all

these skills by accident; they’re probably very aware of career paths, training programs, and openings

in other departments—things an employee with less experience might not know or care about. Or they

may also be fully aware that they’re taking a job they’re overqualified for and could easily turn into an

attitude problem for you and everyone else. These are all management challenges that a new manager

may not yet be ready to handle.

General Interview Guidelines Some guidelines for conducting interviews include the following:

• The candidate may be nervous (especially if he’s interviewing for his first job or he’s anxious to get

back to his current job before his extended lunch hour is noticed). Try to make him feel comfortable

with a few light comments (e.g., “I hate interviews, don’t you?”) or by asking a few easy questions

(e.g., “How are you? Did you have any difficulty finding the office?”).

• After you get started, see if you can get the interview away from the question/answer format and

into more of a conversation or discussion. Both you and the candidate will benefit from a more

relaxed exchange of information. Not every person can relax in an interview, however, and other

factors (such as the chemistry between the two of you) may influence the tone of the meeting. Don’t

overemphasize this aspect of the interview, especially for individuals whose interpersonal skills

aren’t as critical to their success on the job as, say, their technical skills. • Don’t do all the talking! Many hiring managers spend a great deal of time talking, as opposed to

listening. Don’t tell the candidate too much about what you’re looking for (at least not until you’ve

heard what the candidate has to say). If you do, the smart interviewee will simply regurgitate what

you say back to you. It’s the candidates who should do all the talking, but they can’t do so unless

they are given a chance. You are there to evaluate them first; all your other responsibilities (such as

presenting the position, representing the company, and so on) come second. • Avoid asking yes/no or other short-answer questions. You really want the interview to become a

discussion. Use questions that force the candidate to give descriptive answers. Questions that start

with “how” or “why” are great for this. Make them think on their feet.

• Toward the end of the interview, always give the recruit a chance to ask her own questions. Most

candidates are usually armed with a couple of standard questions for this opportunity. The smart

candidate might ask you a question about something discussed in the interview to demonstrate that

she was listening or is interested. Even smarter candidates will show that they’ve done their home-

work and ask you some questions based on researching your company. • Many interviews are now conducted with several people from the hiring company in the room at the

same time. The advantages are obvious: while one person asks the question, the other people can

evaluate the candidate’s nonverbal responses; and multiple interviewers can not only think of more

of the key questions to ask but they can later share different perspectives on the same person. It’s

also an incredible time-saver.

86 CHAPTER 3 Staffing Your IT Team

Prepare a List of Questions Always prepare a list of questions that you can refer to during the conversation. You can, and should,

ask both technical and nontechnical questions (performing a technical interview is discussed later in

this chapter). The questions will depend on the position you are recruiting for. If you’re recruiting for a

project manager, for example, you might be more concerned about the candidate’s leadership and man-

agement skills than you would be if you were interviewing a programmer. However, if you’re involved

in interviewing a programmer who reports to one of your project managers, you may not have the

expertise to ask meaningful technical questions. Still, your interview in this situation can be just to

evaluate the individual’s background, professionalism, maturity, and personality.

Once prepared, ask the candidate what they think the key issues in their field are and how well they

know them. Also ask them if they can provide a specific example that can confirm what they just said

about themselves.

Nontechnical Questions Some nontechnical questions that you can ask include:

• “How was this position described to you?” (This is a great way to find out how the people the

candidate met prior to you, such as the headhunter, hiring manager, and HR, view the position.) • “What were your responsibilities at your last job?” • “Describe a crisis that you were involved in and how you dealt with it.” • “Describe an assignment or role you really didn’t like and why you didn’t like it.” • “Describe the pace and culture at your previous jobs and which ones were good and bad matches for

you.”

• “What did you like/dislike at your last/current job?”

• “Tell me about the relationship you have with your current manager. Do you work well together?

What would she say about you? Is she a good manager?” (Be careful not to tread into personal

waters here. A person can be a great manager and a difficult person and vice versa, but for the pur-

poses of this conversation, make sure to keep the conversation on a business level. If the candidate

starts making personal comments, change the topic.) • “Which industry trade journals do you read?”

• “What do you know about this company?”

• “Did you go to our website? What did you think of it?” (Every candidate should go to a company’s

website before an interview. You are looking for their reactions to the site, not if they looked at it.

If they did not look at it beforehand, that is a bad sign.) • “Why are you interested in this job or working for this organization?” • “What doesn’t your résumé tell me about you?” • “What motivates you?” • “What do you like, and not like, about working in IT?”

• “What do you want/expect to do on a daily basis at work?”

• “What do you like to do when you’re not at work?”

You can also have them walk you through their job history. They can tell you why they took certain

jobs, why they later left them, their accomplishments at each one, and what they took away from each

job (regarding learned experiences).

873.4 Selecting candidates

Remember, you’re listening to how they answer, as well as to what they answer. You may not agree with everything they say, but if they can convey their answers clearly, with confidence, and back them

up with sound reasoning, it demonstrates a certain level of professionalism, maturity, communication

skills, and analytic thinking. One technique is to look for people who are hungry (eager to learn and

execute), humble (modest), and honest.

It’s a good idea to have a set of questions that you ask all candidates. This allows you to have a

common frame of reference. Also, take plenty of notes during the interview. After just a few candidates,

you’ll have difficulty remembering who is who. Good notes can come in very handy a few days later

when you’re trying to decide who to bring back for a second interview or when you’re trying to explain

to a recruiter why their candidate isn’t qualified.

What Not to Ask Court decisions and legislative statutes have placed some topics off limits in interviews: race, gender,

marital status, age, handicap, sexual orientation, and religion, among others, are topics to be avoided.

Not only should these items never be discussed in an interview or any other job-related discussion, you

can’t use them as factors in making decisions.

For example, if a petite woman applies to be a PC technician, you may doubt her ability to do the

lifting of equipment that the job requires. However, you cannot dismiss her out of hand. What youmay be able to do is say to her that “the job requires you to unpack, move, and lift PC equipment that weighs

up to 25 pounds; are you able to perform these tasks?” Similarly, if the same small woman applies for

an operations position in the computer room, you may be concerned about her ability to reach the tape

cartridges stored on the top shelves. If she is otherwise qualified, the courts would probably tell you to

hire her and to make “reasonable accommodation” such as investing in a step stool. These are all very sensitive areas. Before asking any list of questions, consult with your HR or Legal department. You may be putting your company and yourself at risk of litigation.

Some interviewers like to ask particularly tough questions and conduct interviews more aggres-

sively. Sometimes this is for sound reasons (e.g., you want a sales rep who can handle all kinds of cus-

tomers and prospects and difficult situations). Other times it could be because the hiring manager has a

large ego and seeing others squirm reinforces his status (at least to himself). If candidates are wiping

their forehead and saying “whew” when they finish an interview, you may want to ask what value you

get from that interview style.

Who Else Should Interview a Candidate? Allow others to interview the candidate, whether it’s for technical reasons or to compare personalities

and demeanor.

• You can have your own peers interview the candidate.

• You can ask individuals who are at peer level to the open position.

• You may want to have your boss meet the recruit. • If the position requires interaction with other departments, they may want to have a representative

involved in the interviewing process. • The HR department, if they haven’t done the initial screening, will also be able to provide an

alternative view.

• If you’re interviewing someone who will have management or supervisory responsibility, it isn’t

unheard of for them to meet with some of the people who will be their direct reports.

88 CHAPTER 3 Staffing Your IT Team

Including other interviewers makes the process more complicated and adds more time, but it’s well

worth it. You’ll find that multiple interviewers, collectively, are more selective than any one of you

individually. That’s a positive thing. It increases the chances that when you do agree on a candidate,

it will turn out to be a good one. Also, allowing other members of the department to participate in the

interviewing process demonstrates to your team that you respect their opinions and that you’re inter-

ested in hiring someone who will fit well into the team. Lastly, anyone you involve in the decision is

less likely to criticize the choice later.

You may not want to bring in other people (or be directly involved yourself) until a certain stage in

the process; some job postings generate hundreds of responses and require an aggressive filtering pro-

cess before the first interview is held. If you are going to have people help you with interviewing, plan

when you want their help before you contact them.

A DIFFERENT PERSPECTIVE ON THE SAME CANDIDATE

One of the coauthors was interviewing a candidate who seemed to be a good fit for a position. The candidate was brought back tomeet several of his peers-to-be for interviews. On this second round, all themale interviewers thought favorably of this candidate, but the one female interviewer had misgivings and thought that something was amiss. She suggested that the candidate may have a problem working with women. The candidate was brought back to meet with another female interviewer who took an instant dislike to the candidate. It will never be known if the candidate did indeed have a problem with women. But, the important thing here is that different people do have different perceptions and insights. Consider that an asset and tool at your disposal. The candidate was rejected.

Key Concepts for a Good Technical Interview Technical interviews are needed to help judge if a candidate has the appropriate skill level for the job.

However, it’s quite common for IT Managers to lack the knowledge base for conducting in-depth tech-

nical interviews. This is most frustrating if you’re interviewing for a position that reports directly to

you. In some cases, you can have others within the IT organization conduct technical interviews. Also,

it’s common to hire a consultant to conduct technical interviews with candidates you’re interested in.

Don’t be ashamed that you don’t have detailed technical expertise. You’re never going to have all the expertise that your team does—the IT world is changing too fast. Also, because you’re a manager,

you may no longer be spending your days doing the hands-on work you did just a few months or years

ago. Find out what the key issues are for the technical area that you’re interviewing for. Talk to some of

your other employees; they may know some of the key topics.

Do Some Preliminary Reading Research particular topics of concern on the Web or in print materials. Even if you don’t ask specific

technical questions, you can ask a candidate about important issues associated with his area of exper-

tise. What does he think of a particular vendor’s support or quality assurance? What does she think of

competing products? What about open source software? What is her prediction of the future of Linux?

Let Them Explain Technologies to You A clever way to hide your ignorance, as well as get an education, is to ask candidates to explain certain

technologies to you. “What is a subnet mask?What is meant by object-oriented programming?What do

you think if IPv6?What are the pros and cons of Java versus Cþþ?” Of course, youmay not know if the candidate’s answers are correct, but you’ll probably be able to judge if he’s just “winging it” or really

893.4 Selecting candidates

has an understanding of the matter at hand. You’ll also be able to determine what type of interpersonal

skills he or she has: Can she articulate complex thoughts clearly? Does he come across as condescend-

ing? Are his opinions so strong that you worry he may prove to be inflexible?

Testing Candidates You may also consider giving the employee a formal test. This could be one you develop yourself or

done with the assistance of testing software. Of course, many candidates may not like taking a test

because they realize that it may show particular skill deficiencies or they may be poor test takers.

But more important, testing may create an impersonal atmosphere that places more value on spe-

cific knowledge than on the individual person and their ability to contribute, accomplish, and succeed

on a team. Also, testing only evaluates the mechanics of a skill. It doesn’t evaluate the employee’s

aptitude with it nor does it evaluate the employee’s other qualities, such as dedication, ability to juggle

multiple priorities, and interpersonal skills.

Nonetheless, testing can be an effective technique for some positions. Jobs that have very specific

and easily quantified requirements (specific software application experience, for example, or words-

per-minute typing skills) are good candidates for screening tests. In addition, many jobs now get many

qualified candidates and many of those candidates are willing to fudge their abilities; testing can level

that playing field.

You should have a standard test with an answer key. If you have a very small department or com-

pany and you can’t develop your own test, call in a consultant to help you craft one. Having the test

results readily available can also give your technical staff something concrete to discuss with the

candidate—it forges an instant bond if the chemistry is there.

ARE “PROFILE” OR “PERSONALITY” TESTS USEFUL?

“I have found these tests—which we call ‘Profile tests,’ by the way, because ‘Personality tests’ are not what they are—to be an extremely useful hiring and management tool.

Here are some things to consider if you are going to try them:

• The ‘softer’ aspects of a person can be difficult to evaluate in a two-hour interview process. These tests often reveal information that we would not have figured out until later, after the person was hired.

• While these tests are very accurate about some items, the final decision is still up to you on how to use the information they provide. They measure raw intelligence power well, for example. However, not every job needs to be performed by a very intelligent person; at the same time, some jobs are complex, analysis- driven positions that require high IQ power just to understand. These tests can help you make that determination.

• When we decided to use these tests, we tried them on everyone in the company first. We found them to be very good predictors of corporate behavior.

• Weuse them on the second interview; the first interview is a general one, where we try to keep our commitment level and the candidates’ to a reasonable level. Sometimes, despite all the paper, it only takes a few minutes for a person and a company to figure out they are not a goodmatch. Profile tests (which take about 45 minutes and are administered by an outside firm) are done once the first hurdle has been passed.”

—Cathy Thompson Cofounder and Principal

Thompson, Hennessey & Partners, Commercial Real Estate Boston, Massachusetts

90 CHAPTER 3 Staffing Your IT Team

One final note of caution: some companies have strict guidelines against testing candidates. The legal

implications of testing are unclear; be sure to verify with your HR department what your company

allows you to do.

Interviewing Candidates over the Web With the growth of remote workers through telecommuting and work-from-home programs, it is be-

coming increasingly common to first interview candidates who are not geographically close to your

office location via technology before bringing them in for a face-to-face interview.

Remote interviews can be done using the web-cam capabilities of a number of different applica-

tions, everything from instant messaging (like Microsoft Live Messenger, Yahoo, Google Talk), to

web-conferencing products (like WebEx, Adobe Connect), all the way up to full video-conferencing

setups (like those from Polycom and Tandberg). All of these options provide voice and video capabil-

ities, although you’re always free to use traditional telephones for the voice portion.

While interviewing a candidate over the Internet is extremely cost-effective and efficient, it is not

without its challenges. To ensure that the process is as smooth and effective as possible for you and the

candidate, there are some guidelines to keep in mind.

• Widely used technology. Try to use web communication/conferencing tools that are already widely used (e.g., Skype). Not only will this minimize the chance of any technical gotchas, but

it also increases the chance that the candidate already has it and is familiar with it. • Prep/practice time. Be sure you give the candidates sufficient time to get familiar with the tech-

nology before the actual interview. If you will be using free software solutions from theWeb, invite

the candidate to try it out with family and friends to get a comfort level with it. • Getting started. Encourage the candidate to relax and just be himself. Invite him to keep a glass of

water nearby. If chatting for more than 30 minutes, suggest a break.

• Appropriate environment. Both you and the candidate should select a setting that will be away from background noise, distractions, and interruptions. Also, be aware of what will be behind you

and on camera. Better that you should be sitting in front of a solid-colored wall as opposed to a

window where the background activity may be distracting, or the light impacts the quality of

the video image. • Distracting habits. Be conscious of your own behavior. If you tend to tap your fingers, click your

pen, or shuffle papers, it cannot only be a distracting visual, but the microphone will pick up the

noise and add to the distraction. If you find the candidate is doing something like that, let him know

that the microphone is picking it up. He’d probably rather know about it so he can stop as opposed to

finding out that you were distracted during the whole interview by it. (If they do not preemptively

prevent screaming children and barking dogs from the session, take that as a clear sign of howmuch

they care about the interview.) • Making eye contact. The tendency is to look at the screen image of the person you are talking to.

However, when you do that, the person on the other end feels like you are not making eye contact

with them. Remember to periodically look directly into the camera, both when you are talking and

listening to the other person. This will help establish eye contact and a greater sense of connec-

tion. Otherwise, the candidate may get a sense that you are not terribly interested in what they are

saying.

913.4 Selecting candidates

• Speaking clearly. Because of the limitations of audio over Internet, be sure that you speak in a manner that is easy to understand. This is especially important for those with accents, or those

who are not native speakers of the language they are interviewing in.

• Time delays. A video or voice call over the Web can have a slight delay in the audio (similar to a cell phone call) and the video. Keep this in mind and be careful to avoid speaking at the same time

the candidate is speaking. And, before responding to something a candidate has stated, take a mo-

ment or two to first see if he is actually done with his thought, or just taking a pause.

• Making allowances. Most candidates are nervous during an interview, and they are likely to be more nervous with a video conference. Be sure to take that into consideration if their speech

and body-language aren’t what you would normally expect in an interview.

• Picture-in-picture.Most of the Internet video-chat tools have a picture-in-picture capability so that you can see how you look on camera while you’re seeing the other person. It is a good idea to use the

feature to help ensure you’re seen the way you want to be seen. • Traditional interview practices. Just because you’re interviewing on video-over-the-Web, don’t

forget standard interview best practices: careful listening, asking good questions, giving the

employee an opportunity to talk and ask questions, etc.

• Wrapping up.As you wrap up the interview, ask the candidate what he thought of interviewing this way. You may get some good feedback that you can use to improve the use of the tool in the future.

• Being sure to exit the call. When the interview is over, be sure to exit and close the software. Otherwise, you risk the session being open and the candidate seeing and hearing what you do

and say next.

A video conference over the Web is no substitute for a face-to-face interview. However, for candidates

that are distant from your location, it can be an effective tool for the initial interviews and screening of

candidates before going through the effort and expense of bringing them into the office.

If the candidate will be working remotely once they get the job, the video-call interview can give

you good insight as to what it will be to interact with them and “meet” as employees once they have

the job.

The Right Skill Set for the Job Have a well-defined list of criteria before you start recruiting. Use this list to weed out résumés and then

use a fine-tuned version of that list to interview candidates. Bring the list to the interview itself—you

are running the show, so worry more about being thorough and complete and less about appearances.

Keep in mind that you’re interviewing for two skill sets. One is technical skills and the other is everything else: their attitude toward work, ability to juggle multiple priorities, ability to work with others, general intelligence, resourcefulness, potential for growth, dedication and commitment, profes-

sionalism, and maturity. You may also be looking for project management skills, supervisory skills,

and interpersonal skills, as well as the ability to write reports or give presentations.

When to Accept Similar Experience Should you accept similar experience? It all depends on how similar the experience is to what you’re

looking for. It also depends on your needs. If you need to put someone to work on the first day, to be

productive on a critical project, your definition of similar might be quite narrow. However, if you can

92 CHAPTER 3 Staffing Your IT Team

afford to invest time to bring an individual up to speed, then your definition of similar may be more

forgiving.

If you like a candidate, but have concerns that his experience isn’t similar enough, share your

thoughts with him directly. “I like your background, Patrick, you have excellent experience, you’d

be perfect for the job, but I’m concerned that you don’t have enough experience with X technology.”

At the very least, by doing this you’re being honest with the candidate and letting them know why

there is a chance they won’t get the job. More important, you’re giving the candidate an opportunity

to respond. For all you know, Patrick may have something in his background that wasn’t mentioned on

his résumé that will make you feel a lot more comfortable about his experience or about his ability to

compensate for the gap.

With your responsibility as an IT Manager revolving around technology, it’s easy to get caught up

in specific technology experience when recruiting—hardware models or software version numbers.

Of course, these skills are important, but the technical skill set is only a portion of the qualifications.

Softer skills such as interpersonal interaction, writing, attention to detail, and ability to function in a

team environment can be just as vital.

Rank Criteria Have a well-defined list of criteria for a job established before you go into the interview. As part of the definition process, you can rank each criterion in terms of importance. These rankings will vary from

department to department and company to company. Some organizations rank teamwork way ahead of

technical skills, whereas others place a much higher value on technical competence than they do on the

ability to work well with others.

You may find that an interviewee is a bit weaker in one area than you would like, but significantly

stronger in another area. Also, more than likely, you’ll see résumés and candidates who have similar

experience to what you’re looking for. You may find that a candidate’s technical expertise is weaker

than you would like, but they strike you as someone who is very bright, picks up new skills quickly on

their own, and is a very hard worker.

It is pretty common for a manager to value softer skills (personality, intelligence, interpersonal,

resourcefulness, etc.) over specific technical skills. The idea behind this is that technical skills can al-

ways be learned (and in the ever-changing field of IT, picking up new skills is an ongoing requirement

for success), but teaching someone how to be responsible, likeable, or intelligent isn’t as easy.

In addition, the priority you assign to these skills will vary on the job in question; because many

technical jobs require relatively little personal interaction, a candidate’s ability to “work well on a

team” may not be of much value.

In the end, as you weigh all of these issues to make your choice, don’t be surprised if you feel you’re

making a judgment call—you are.

Other Requirements That You Might Be Flexible About • Years of experience.What’s more important than the number of years is what the candidate did in

those years. • College degree. Perhaps this is more important for a manager, but it’s less so for a technologist. And

the more years since that college degree, the less it adds value as opposed to experience.

• Training. Pertinent training? Fundamentals or advanced? How long since the classes were taken? Have the skills been used out in the real world?

933.4 Selecting candidates

• Specific hardware and software technology. Is a dot version or two behind in software truly a disqualifier? These days, everything gets outdated quickly.

• Environment size. This can be measured in terabytes of storage, users, number of applications or servers, or number of locations—whatever is appropriate for your needs.

• Certification. It may not show anything more than they can cram and memorize to pass an exam. See the next section for a separate discussion of this issue.

• Industry experience. Frequently, IT workers don’t see enough of their company’s business environment to really have a legitimate feel for the industry they’re in. While similar industry

experience is nice, you may want to broaden it to a more macro level, such as manufacturing or

services, for example.

Ability to Learn When considering prerequisite technical skills, remember that virtually everyone in IT must be at least

smart enough to master new skills and adapt to changes in technologies and products on a regular basis.

If you have faith that a person is smart enough to learn new skills, youmaywant to consider trusting that

faith with someone who might have to take some time to come up to speed on the specific technology

set in your environment.

The Value of Certification The IT world has gone a little crazy with certification. Chances are that if you’ve heard of a particular

hardware or software product, the vendor is offering some type of certification for it. There’s an

alphabet soup of available certifications, including CCNA, CNE, CNA, MCSA, MCSE, CCIE, CCNP,

Aþ, CCIP, MCAD, MCT, CISSP, PMI, MCSD, MCP, MCDST, MCDBA, OCA, OCP, OCM, CLS, and CLP, to name just a few.

Certification really hit the front pages with Novell’s Certified Netware Engineer (CNE). In the late

1980s and early 1990s, everyone wanted to be a CNE. To many it seemed like the passkey to dream

jobs. However, by the mid- to late 1990s, a new term was coined: “paper CNE.” This term referred to

people who took crash courses, studied intensively, and passed the CNE exams, but had virtually no

experience to go with the new accreditation on their résumé. Novell’s restructuring of their certification

program helped deal with this. It’s an interesting commentary that 10 to 15 years later, having a CNE

was considered of minimal value since Novell had lost so much mind and market share.

Vendors must monitor their certification programs like the Federal Reserve monitors interest rates

to balance between too much and too little growth. Vendors don’t want their certification program to be

so easy that it has no value or prestige, but at the same time, they don’t want the programs to be so hard

and elitist that too few people are able to pass the tests.

Test-Taking Skills Whether it was in high school, technical school, or at the Department of Motor Vehicles, we all learned

that a passed exam only represents knowledge at that particular moment, which may only in itself rep-

resent the ability to study prior to the exam. The same can be said of technical certification. If someone

is certified, you know what their knowledge set was at the moment they were tested, which could mean

they have the ability to study very hard, have a steel-trap memory, or have information that was

ingrained during years of experience. While many IT Managers recognize this, many also look for

94 CHAPTER 3 Staffing Your IT Team

certifications on résumés. Similarly, many managers looking for programmers prefer individuals with

four-year college degrees, even though a college degree may add no value to a programmer’s skill set.

Value of Commitment One aspect of accreditation that’s often overlooked is its representation of commitment and persistence.

Getting certified usually means passing a series of exams. For many, it also means taking a series of

classes. Doing this takes time, energy, and motivation. When you see someone who has been certified,

perhaps the first thought you should have is “here’s someone who can stick with something and see it

through to the end.” Not a bad trait for someone who will be managing projects. The same can be said

about college degrees, especially if they’re obtained while working full time.

When you see a candidate with certification, be sure to consider how long it’s been since that

accreditation was obtained and to what degree those skills have been used since. If required, ask them

if they have kept their certification current with continuing classes and exams.

Checking the Value of a Certification There are a number of steps you can take to check the value of a certification:

• Talk to your own network of contacts. • Contact the technical area’s association (if there is one). Ask them about the value of certification;

they might be also able to point you to a source that can either verify or deny their claims.

• Contact the product manufacturer. Companies such as Cisco, IBM, and Microsoft have extensive

certification programs and local contacts. Again, they will tout their own benefits, but they might

also be able to point you to specific individuals who benefited from or are looking for those skills.

• Scan the Web. Are other employers asking for this in their ads? If the certification appears often,

that is a good sign.

Education Education has changed radically in the last 20 years. Now there are online paper mills, rock-hard cer-

tification courses, distance learning, for-profit colleges, and $200 K tuition bills. The simple criteria of

yesterday (“a four-year education is invaluable these days”) have changed.

Bill Gates is the richest man in the world according to Forbes, and chairman of one of the world’s

largest and most successful companies, yet he never finished college. Neither did Steve Jobs of Apple,

nor Mark Zuckerberg of Facebook. However, Larry Page and Sergey Brin, cofounders of Google, met

while they were pursuing doctorates at Stanford. According to a Bureau of Labor Statistics report

released in 2010 (www.bls.gov/spotlight/2010/college), the median weekly earnings of workers with bachelor’s degrees were 1.8 times the average amount earned by those with only a high school diploma,

and 2.5 times the earnings of high school dropouts. And, even though the IT industry is filled with

stories of those who have succeeded without a college degree, the economic downturn has increased

preference for graduates—it’s easy to understand why a hiring manager will choose a graduate when

faced with a high-number of quality candidates.

When looking at the value of an education for a new hire for your company, consider three things:

• Type of education

• Direct value to the job

• Indirect value to the job

953.4 Selecting candidates

Direct Value to the Job As a rule, the more hands-on and technical a position, the less direct value a typical four-year degree has for you as the employer. This is even truer for a graduate degree. Is a Java programmer with an

MBA a better programmer than a Java programmer who only finished high school? Some might ar-

gue that the programmer with only a high-school degree might be better since all those years went

toward actual experience rather than the more theoretical academic experience. Notice the emphasis

on the word “direct.” Of course the MBA may serve the programmer well as he moves up in his

career.

A college education is of more value to a position that involves supervisory or management

responsibilities. Also, a college degree is often a prerequisite to getting a supervisory or manage-

ment role. As a general rule, actual experience and skill should always carry more weight than any

educational requirements. And even for someone who has significant educational credentials, the

value of that education generally decreases with time. The most important point here is: How easily

can the candidate learn new things? The world and the marketplace we work in change quickly and

significantly. Has this candidate shown the ability and interest to learn new tools and skills as they

become the new standards? Lifelong learners are often the most productive employees in an

organization.

A four-year degree will also sharpen skills for writing, analytic thinking, reading comprehension,

and so on. Sometimes the value of those skill sets is often overlooked until you see that first horribly

written e-mail from a staffer.

Indirect Value to the Job However, a college-educated employee can provide several important indirect benefits to a position. Pursuing a four-year degree can be a difficult and complex task; it can show the individual’s willing-

ness to make a commitment and follow through. It can be a financial challenge; many people have to

pay for a portion, or all, of their college education themselves. It can be intellectually challenging;

a person may be pursuing a programming career now, but 10 years ago chose physics as a major in

college.

At the minimum, you should seek a high-school degree for virtually all positions. This should at

least give you an indication (although no guarantee) that the individual has the fundamental skills

to operate in a job (reading, writing, basic math, etc.). As you move up the education ladder (two-

and four-year degrees, graduate degrees, etc.), look to it as an indication not necessarily of a higher

degree of technical skill, but of more skilled analysis, comprehension, and verbal skills.

Business-Related Degrees If their degree is in a business-related discipline, it may indicate that they’ve been exposed to many

ideas and concepts that they’ll encounter to various extents within IT. This exposure may be valuable

for someone who does systems analysis or is involved with management. It can also be valuable to have

a person with these skills on your staff; they can serve as a kind of liaison or translator to the Sales and

Marketing departments.

96 CHAPTER 3 Staffing Your IT Team

Hard Sciences-Related Degrees If the candidate’s degree is in one of the hard sciences (physics, mathematics, chemistry, e.g.), it may

show that they have a stronger ability for logical and analytical thinking. Candidates from these fields

may also have greater focus on detail, documentation, procedure, etc. Start with this assumption and

verify it with further questioning.

Soft Sciences-Related Degrees If the person has a degree in one of the social sciences (psychology, sociology, e.g.), they may have

greater skills in user-oriented activities (support, training, process improvement, user interface design,

etc.). Theymay have a greater ability to see things from a different perspective and not be limited by the

idea of “only one right answer.” Start with this assumption and verify it with further questioning.

Technical Courses Many candidates now list on their résumé individual technical courses they have taken, even if they

haven’t received any certification. If the skill in question is one you are interested in, ask about the

courses, how far into the course had the candidate gone, and why did he stop?

Checking References References are too often overlooked. Some employers ask for them (especially on the application) but

never check them. Some employers check them after the candidate starts, and some check them before

the offer is made. Most HR departments handle the reference-checking aspects of hiring; confirm with

your HR department to see how your company handles this process.

There are two types of references to check: background checks and professional references.

Background Checks This is the validation of the accuracy of what the candidate says on the application or résumé. This

usually includes contacting schools to see if the person did attend and received the degrees and cer-

tifications he claims. This is also for confirming his past employment to see if he did indeed work

at the companies he claims for the time frames he claims. The background check may also include

a review for any criminal record.

Doing background checks can be tedious and time-consuming, and many companies outsource it to

firms experienced at doing it. Some organizations contacted for this information may first ask for

authorization from the individual (such authorization is usually included in the fine print of many

employment applications). Some organizations (particularly former employers) may only give out

limited information. They will typically confirm the dates of employment, but won’t provide title,

salary, or any comment (good or bad) about their performance.

Professional References This is the opportunity to speak to individuals that the candidate has worked for and with to get some

more insight into the candidate. It’s quite common to ask for three references. If the candidate can’t

provide them, an immediate red flag should go up.

973.4 Selecting candidates

You should assume that any references the candidate gives you will only have positive things to

say—he’d be crazy to put you in touch with people who thought otherwise about him. It’s for this rea-

son that some people place little value in calling these references or simply think of it as clerical work

that HR can do.

However, there is still some value to be gained by making these calls, and making them yourself.

While you’re unlikely to hear anything negative about the candidate, you should ask open-ended ques-

tions to see what the references say about the candidate. Are they using similar adjectives, describing

the same traits and characteristics? Does the information provided by the references match what the

candidate said? Some questions you can ask include:

• “When, and for how long, did you work with John?”

• “What was his role?”

• “How would you describe him as a worker?”

• “Why did he leave your company?”

• “What types of work does he enjoy?”

• “What types of work does he excel at?” • “How would you describe his relationships with coworkers and his manager?” • “What types of work does he enjoy least?” • “Is there anything else you’d like to tell me about him?”

• “Would you want to work with him again?”

With luck, the references will give you feedback that matches your own perception of the candidate

(and validate what he’s told you and put on his résumé). If there is a disconnect, you have to try to gauge

how big a gap there is and what that might mean.

It is also becoming increasingly popular to include an Internet search when checking the references

of a candidate. This may be something that the hiring manager or HR does somewhat informally or may

be a specified part of the process when checking references. Very often the results may give some

insight into the candidate’s personality. Trade journals are filled with stories of hiring managers

who found something offensive about the candidate when doing an online search or learned enough

to determine that the candidate may not be a good fit with the culture of the organization.

Hiring managers have even made decisions by what they can assess about the candidate’s judgment

by what they’ve found on the Internet. For example, if a candidate has pictures of himself passed-out

drunk on his Facebook page, the hiring manager may wonder about the professionalism and judgment

of the candidate in keeping those pictures online (especially during a job search) and what that may say

about the candidate’s professionalism and behavior in the workplace. Much more problematic are hir-

ing managers who may consider factors unrelated to job performance (e.g., political views) about a

candidate that they find on the Internet.

Common Hiring Mistakes At some time or another you’ll probably discover that you misjudged a candidate. You may discover

that someone you thought would be fine doing programmaintenance is a stellar performer and has great

potential or youmay find that the candidate you thought was ideal turns out to be a dud. Hopefully, your

errors in judgment will be more of the former than the latter. To avoid out-and-out mistakes, be on the

lookout for:

98 CHAPTER 3 Staffing Your IT Team

• A poorly defined position. If you don’t describe the position accurately (the good and the bad), you may end up getting bad résumés and selecting a candidate who doesn’t fit.

• Hiring for the wrong reasons. Because you dislike the entire hiring process, you only meet with two people and pick one quickly.

• Not getting enough input. As suggested earlier, it’s a good idea to have other people meet with strong candidates. Every interviewer has a different approach and perspective and asks different

questions. It’s entirely possible that someone else may notice something that you didn’t.

• Talking too much (or too little) during a job interview. The best interviews occur when both the candidate and the interviewer have a chance to learn about each other. If one party does all

the talking, there will be a large information gap when it is over.

• No reference checks. Not every company does these (because the responses are often so rote or be- cause they add time to the hiring process). Many companies are now outsourcing this function, so it

might be worthwhile to alert your candidate to the fact that their references will be receiving a call.

Offering the Correct Salary for an IT Position When you start to recruit for an opening, you should have a salary range in mind. This range can come

from several key sources of salary data:

• The HR department of your company

• Recruiters

• Web and computer magazine salary surveys (e.g., salary.com, payscale.com, wageweb.com, and

salaryexpert.com)

• Other individuals in your company doing similar work

• Salary levels that you’re seeing from candidates who apply • Salary of the previous individual in that job • Salaries of the staff members, if any, who report to this position

Before Making the Offer Make sure that HR and whichever other upper management individual(s) need to approve the final offer

are in agreement on the specified range. You’ll know if your range is too low based on the response you

get to your recruiting efforts. If only a handful of people apply, you’re probably offering too little.

Although it is not uncommon for someone to change jobs for the same salary, most people expect at least

a 10 percent increase. This increase compensates them for the risk that is inherent whenever someone

changes a job, but it also entices them to take your job. Nonetheless, you can’t offer more than you,

or your company, can afford to pay. And you’re probably not the only person who decides that figure.

If the last individual in the position was a poor performer, that might be justification to convince yourself,

HR, and the powers-that-be that you need to offer moremoney to attract better talent. An extended search

that doesn’t find any reasonable candidates can also be a justification for reviewing the salary range.

Using Agencies Be careful when you share the salary range with any agencies you use. Because their commission is

based on the annual salary, they have a vested interest in placing someone at the highest possible salary.

It makes their job easier to find good candidates if the salary you are offering is competitive. If the

993.4 Selecting candidates

recruiter winces when you tell her the approved salary range, don’t take it too personally—she’s just

doing her job.

Because the agent’s commission is based on the salary of the person you hire, they may be tempted

to inflate the salary of the candidates they send you. As a check, ask the candidates themselves about

their salary. The written application that the candidates fill out (with the usual legalese about misin-

formation being grounds for immediate dismissal) can also help you get a true sense of what their

current compensation is.

Other Ideas besides More Money Invariably, the candidate you like the most will be the one that stretches the envelope of your salary

range. If you don’t think you’ll be able to attract this person with your salary offer, there are a few things

you can try.

• Consider promising a salary review (not a guaranteed increase, but a review) six months after the

person starts. Don’t commit to a specific increase amount (after all, the candidate may not work out

or the company may change its salary ceiling). But the chance of an increase in six months may be

just what you need to attract the person. (Make sure to get approval from HR/management before

you promise anything.)

• Make the position and environment sound as exciting and attractive as possible. Naturally, remain

truthful about it. Making something exciting doesn’t mean lying about it. You want the person to be

as motivated to take the job as you are in offering it to him; that will make finding a middle ground

much easier.

• Get the candidate to look at the entire package. Today’s competitive IT environment has spawned a

wide range of noncash incentives that can be far more lucrative than “mere money.” Emphasize

those to the candidate. Does the position have bonus potential? Make sure the candidate includes

that figure in her consideration. Does your company offer a stock purchase plan? A profit-sharing

plan? A matching 401(k) plan?

• Many workers today are enticed by work-style options that match their lifestyles. Working from

home, telecommuting, and flextime are all options that can be very important to some candidates.

(Sometimes it can be a personality issue—many programmers are not “morning people,” for

example—but often it can be a family issue. People with small children or elder-care responsibil-

ities have enormous time management challenges and respond favorably to companies that offer

them options in this regard.) Many IT jobs are—although many are not—suited to alternative work

arrangements.

• Also, make sure that the candidate is fully aware of your company’s benefits programs; health and

insurance benefits can have very important positive tax benefits. Stock options should also be

clearly specified if you are making them part of your offer. Originally a benefit only for the upper

reaches of a corporation, stock options have now become a part of many workers’ pay plans

throughout the ranks of an organization. Companies are offering employees a more direct partic-

ipation in the profits of the organization as a whole. Is it a good working environment, with little

demands for overtime and being on-call? If so, it could be a key selling point. If there is an on-site

gym, make sure to mention that.

• Don’t forget to talk about vacation time. With today’s society, particularly in the IT world, it some-

times feels like the workday never ends. It’s not uncommon for people to leave the office, go home

100 CHAPTER 3 Staffing Your IT Team

for dinner and time with the family, and then log on to the office to answer e-mails and do more

work. Many people read e-mail and do work 7 days a week, regardless of whether they are “at work”

or not. If the position you’re hiring for doesn’t require much off-hours attention or allows for some

working at home or if your company has specific policies or practices in place to minimize over-

work, be sure you mention that as part of the overall package—they can be very attractive to

individuals. (An animator at a studio was told that employees could only work until 6 PM—after

that the boss turned off all the lights. In the interview process he did not believe this claim, but soon

experienced it firsthand (www.gumbydharma.com/).)

3.5 Further References Websites www.adobe.com/ConnectWebConference (web conferencing solution). www.bizjournals.com/seattle/stories/2000/12/11/daily7.html (‘permatemps’). www.bls.gov/spotlight/2010/college. www.destinationcrm.com/articles/default.asp?ArticleID¼4354 (outsourcing discussion). www.facebook.com (social networking site). www.hireright.com (background checking company). recruiting.jobvite.com/resources/social-recruiting-survey.php (recruiting via social media). www.linkedIn.com (professional networking site). www.naceweb.org (National Association of Colleges and Employers). www.payscale.com (salary survey information). www.plaxo.com (networking site). www.polycom (video-conferencing solution). www.salary.com (salary survey information). www.sba.gov/content/determining-size-standrds (business size determinations). www.tandberg.com (video conferencing solution). www.webex.com (web conferencing vendor). www.zoominfo.com (professional networking site).

Books and Articles Bradt, G.B., Vonnegut, M., 2009. Onboarding: How to Get Your New Employees up to Speed in Half the Time.

Wiley.

Brown, J.N., 2011. The Complete Guide to Recruitment: A Step-by-Step Approach to Selecting, Assessing and

Hiring the Right People. Kogan Page.

Erling, D., 2010. Match: A Systematic, Sane Process for Hiring the Right Person Every Time. Wiley.

Herrenkohl, E., 2010. How to Hire A-Players: Finding the Top People for Your Team - Even if You Don’t Have a

Recruiting Department. Wiley.

Jones, D.P., 2011. Million-Dollar Hire: Build Your Bottom Line, One Employee at a Time. Jossey-Bass.

Meister, J.C., Willyerd, K., 2010. The 2020 Workplace: How Innovative Companies Attract, Develop, and Keep

Tomorrow’s Employees Today. Harper Business.

Miller, G., 2010. Hire on a WHIM: The Four Qualities That Make for Great Employees. Dog Ear Publishing.

Shamis, B., 2011. Hiring 3.0: New Rules for the New Economy. Leverage Press.

Smart, G., Street, R., 2008. Who: The A Method for Hiring. Ballantine Books.

Yeung, R., 2010. Successful Interviewing and Recruitment: Structure the Interview; Identify Exceptional Candi-

dates; Hire the Best Person for the Job. Kogan Page.

1013.5 Further references

CHAPTER

Project Management 4 In theory there is no difference between theory and practice. In practice there is.

Yogi Berra

CHAPTER TABLE OF CONTENTS

4.1 Projects and Project Management: A Quick Overview ....................................................................104

4.2 Phase One: Scope the Project ......................................................................................................106

4.3 Phase Two: Develop a Project Plan ..............................................................................................111

4.4 Phase Three: Launch the Project ..................................................................................................116

4.5 Phase Four: Track the Project’s Progress ......................................................................................117

4.6 Phase Five: Close Out the Project .................................................................................................121

4.7 Decision-Making Techniques .......................................................................................................122

4.8 What to Do if/when the Project Gets off Track ...............................................................................123

4.9 Useful Project Management Techniques .......................................................................................126

4.10 Funding Projects .........................................................................................................................130

4.11 Multiple Projects: How to Juggle Them Well .................................................................................132

4.12 Dealing with Non-IT Departments on a Project...............................................................................133

4.13 Further References ......................................................................................................................134

As an IT Manager, your life will revolve around projects—some small, some enormous. Projects are

an integral part of corporate life. This chapter discusses how they are conceived, organized, funded,

tracked, and executed.

Project management is a complex and formal management science, although it is often more art

than science. While you probably won’t need all that complexity and formality to run most successful

IT projects, it’s essential to your success as a manager to understand not only the basic principles but a

few of the advanced concepts of project management.

If you have been assigned the project of installing an e-mail upgrade for the company, for example,

and you are working for a 400-person company, you need to carefully plan how you’re going to

accomplish this task, who is going to help you, how much it’s going to cost, and when is it going

to be done. While it may appear a simple task to someone outside the department, anyone with

much experience in IT knows an upgrade project such as this can take an enormous amount of time,

planning, money, and effort. Careful project management can be the key to accomplishing this task

successfully.

IT Manager’s Handbook.

© 2012 William Holtsnider & Brian D. Jaffe. Published by Elsevier, Inc. All rights reserved. 103

4.1 PROJECTS AND PROJECT MANAGEMENT: A QUICK OVERVIEW You won’t go too long as an IT Manager without hearing the word “project”—you probably heard it a

lot even before you became a manager. “Project” is a catchall word.

Different Kinds of Projects The range of activities defined as projects is very wide:

• It could be a relatively simple activity such as purchasing and installing new PCs for all the com-

pany’s administrative assistants. It might be a more complicated venture, such as deploying a

system-wide application or an operating system upgrade. Or it could be a monumental task, such

as implementing an Enterprise Resource Planning (ERP) application throughout the company. • It might be highly complex and involved (ERP applications are notoriously difficult to implement)

in nature, or not at all (getting the latest tablet device for all the executives). • It might be staffed by a single person in your office or manned by a team of 75 people from five

different departments in three different countries.

• Simple projects may require only a little planning and all the key information is maintained in some-

one’s head. A complicated project may need special project management software along with group

calendaring and scheduling to keep it all on track.

• It might have a very tight and immovable deadline (e.g., installing a new tax package before the start

of the fiscal year) or the time frame may be much more forgiving (e.g., “as long as it gets done

sometime this year”).

Your ability to manage a project so that it meets its goals, within the defined time frame and within the

approved budget, will be one of the single most important skills you can develop as an IT Manager.

The Value of Project Management Project management has become a formal discipline and a widely practiced part of today’s corporate

life. While it isn’t necessary for you to become an official “project manager” (PM) and get certified by

the Project Management Institute (PMI), it’s useful for you to know some of the important principles

of project management to help you in your role as a manager. Every manager has some PM respon-

sibilities, regardless of how those needs are defined; it can be critical to your success to not only accept,

but embrace these responsibilities. Take control of the projects in your business life and manage them

properly—it will be well worth your effort.

Five Key Phases to a Project Starting with Section 4.2, “Phase One: Scope the Project” on page 106, the five key phases of a project are discussed:

1. Scope the project. 2. Develop a project plan. 3. Launch the project. 4. Track the project’s progress. 5. Close out the project.

Various companies and organizations define these phases of projects differently. However, these par-

ticular five stages are taken from the PMI’s Project Management Body of Knowledge (PMBOK),

104 CHAPTER 4 Project Management

the standard text for project managers. The PMBOK is the PM community’s bible; according to the

preface, it’s “the sum of knowledge within the profession of project management.” Many companies

use PMI-trained PMs (who have been taught using the PMBOK) to develop projects.

Do You Have to Be a Certified Project Manager to Run a Project? No. Being a certified PM is definitely an advantage when running large and complex projects, but it

isn’t a requirement—this issue is not too different from the discussion on technical certifications in

Chapter 3, Staffing Your IT Team in the section “The Value of Certification” on page 94. There are many common pitfalls that anyone running a project faces and we’ll discuss some of them

in this chapter. One common problem, for example, is that most project managers may be tasked with

managing the project but don’t have formal authority over project team members from other depart-

ments. This issue can make managing individuals a difficult challenge. But that particular difficulty

isn’t solved by certification of the project manager.

The Project Management Institute (PMI) The PMI (www.pmi.org) is the international organization that trains and certifies project managers. Unlike many certification organizations, PMI is the real deal. Its main certification, a Project Man-

agement Professional (PMP), requires “A four-year degree . . . and at least three years of project management experience, with 4,500 hours leading and directing projects and 35 hours of

project management education” (www.pmi.org/Certification/Project-Management-Profes sional-PMP.aspx). If you see a PMP certification on a résumé, it means the individual has spent a lot of time and effort achieving these goals.

IT Managers may or may not need all the experience that a certificate from the PMI implies

(although some IT Managers now have, and more are pursuing, a PMP; the organization now has

over 400,000 members). However, it’s important for you to know that the science (and art) of project

management has become much more formalized in the last 10 years and that the PMI has been at the

center of that change.

The PMI and its PMP certification are certainly well regarded in the industry. However, like other

certifications and educational backgrounds, the story doesn’t end there. It all depends on how these

skills are put to use.

WHY I CHOSE PMI

I have been a project manager for many different companies in many industries all over the world for over 40 years. A long time ago I decided to get certified as a PM and, after careful study, I chose the Project Management Institute. I picked PMI because:

• They are by far the largest organization of its kind in the world. • They are truly a worldwide group; there are many PM groups, but they are recognized more by the countries where

they are located. • PMI’s requirements for certification are very rigorous. • You must pass a thorough exam. • There is a significant cost involved (to deter people from doing it on a whim). • It requires a demonstrated depth of experience.

—George Puziak Area Project Manager

Davai International, Inc.

1054.1 Projects and project management: A quick overview

A Project Management Office In larger organizations, the volume of project activity is so large that it may warrant the creation of a

Project Management Office (PMO). In its simplest form, the PMO watches over all projects via the

individual project managers and acts to ensure that projects are progressing effectively and that project

managers are being vigilant. The PMO also serves as a traffic cop to ensure that projects aren’t inter-

fering with each other, overusing resources, and leveraging from each other’s efforts, spending, etc.

Depending on the organization and its size, a PMO may be specific to IT or it may be a resource

for the whole company. In the latter situation, a PMO could be overseeing all sorts of projects—ev-

erything from re-IP-ing a network to redecorating the cafeteria.

In addition to overseeing the projects, the PMO also sets standards for project methodology within

the organization. It can define best practices for project management within the organization; this can

include project methodologies that are used, processes for determining justification, return on invest-

ment (ROI), formats for common types of documentation used within a project, metrics, and more. In

highly regulated industries, or particularly complex organizations, the PMO can help ensure that

projects are being handled in a consistent manner and adhering to compliance requirements.

4.2 PHASE ONE: SCOPE THE PROJECT A project generally starts as an idea—either yours or someone else’s. At the very beginning, a project is

usually short on specifics. There’s no framework for costs, time frames, or the resources required. In

fact, as these areas begin to get quantified, potential projects often get killed because they will take too

long, cost too much, require too many staff members to implement, the benefits just aren’t worth the

cost or risk, or their goals are too elusive.

Once you have a project, whether you gave it to yourself or someone else gave it to you, it’s your job

to manage it properly. Obviously, projects of different sizes aren’t all managed the same way. As men-

tioned earlier, the size and complexity of projects can vary tremendously; the approach you take to

implement a three-year, 75-person project will vary greatly from the way you give a single subordinate

an assignment to accomplish in a week.

Clearly Define the Project’s Objective and Scope to Avoid Scope Creep First and foremost, the project needs a clearly defined objective. Objectives can take all kinds of shapes.

One effective way to think of the objective is to ask yourself, “What is the achievement that will most

clearly show that this project is completed and successful?” The objective should also reference the jus-

tification, the ROI, company savings, improved efficiencies, increased functionality, and so on. Setting a

project’s goals are not very different from setting an employee’s goals. (See the section “Development Plans and Goals” on setting SMART goals on page 52 of Chapter 2, Managing Your IT Team.)

A project objective must have several important characteristics. It must be:

• Clearly defined • Agreed upon by the important people related to the project (see the discussion of stakeholders in the

section “Identify the Stakeholders” on page 108 of this chapter.) • Documented

• Measurable

106 CHAPTER 4 Project Management

Other issues need to be considered, but you must first define your objective, get it agreed to, and put in

on paper. Document not only goals but also decisions so that you won’t hear “I never agreed to that” or

“we decided to only allow 50 users into the system.” You want to be able to reply, “No, actually, the

number we agreed to was 150 and I have the meeting notes to show you.”

PMI’s definition of “scope creep” is right to the point: “adding features and functionality (project

scope) without addressing the effects on time, costs, and resources or without customer approval.”

Hallway conversations, side notes in a mid-status report review, and meeting asides are ways that

new responsibilities can sneak into your project without you realizing it. If your objective is clear,

agreed upon, and documented, you will go a long way toward avoiding scope creep.

Very often, when a project’s scope is documented, there is a section identifying what areas are con-

sidered out of scope. For example, a project team may be formed to implement a new application, but the team will only be implementing the core modules and not other ancillary modules. Similarly, the

scope may only be for domestic use, and international use is out of scope for the project.

Also, be prepared for radical changes in project direction—projects seldom progress as planned. It

is important to plan—you need an intelligently designed structure to work within—but be ready when

the plan needs to be changed. In addition, be ready with a rough cost/benefit analysis if new features are

suddenly required.

A TYPICAL CHANGE IN MID-PROJECT OBJECTIVES

When Rob Letterman and Conrad Vernon signed up as directors of Monsters vs. Aliens, a computer-generated spectacle from DreamWorks Animation, they were jittery about all the usual things: telling a good story, rounding up the celebrity vocal talent, and surviving a four-year production process without suffering a nervous breakdown.

Then Jeffrey Katzenberg hurled a curveball at them. After work on the movie was well under way, Mr. Katzenberg, DreamWorks Animation’s chief executive, informed the pair that they would also need to deliver the movie in 3D.

“We were totally taken aback,” Mr. Vernon said, sitting in a conference room at DreamWorks headquarters here. —Barnes, Brooks, The Creatures That jumped off the Screen, www.nytimes.com/2009/03/22/movies/

22barn.html?_r¼1&scp¼1&sq¼3-d&st¼cse

Department versus Company Objectives Carefully match your project’s objectives to the company’s overall objectives. Don’t think of yourself

or your department as an island, but instead think and act as if you are part of a dynamic, constantly

changing organization. As a consequence, define your project’s objective within the company’s overall

goals. This step may sound obvious, but it often isn’t done.

Sometimes the connection between your project and the company’s overall direction is not obvious: it is then your job as the manager of the project to formulate this connection and state it clearly. If your

company is an auto parts dealer and you are installing a new upgrade for the phone system,many people

in the companymight wonder why they have to help and how that activity helps them. You need to have

the answers to those questions ready.

Get Proper Sponsorship for the Project Along with clearly defining the project’s goals, you need to carefully define the sponsors of your

project. A project sponsor is someone who can:

• Champion the project at higher levels

• Clear away organizational obstructions

1074.2 Phase one: Scope the project

• Provide resources (people, budget, software, hardware)

• Communicate with key stakeholders

• Keep the project alive by providing funding, authority, and influence

• Protect the project from those who don’t support it and turf wars

Very often, a project sponsor will send a communication out to everyone involved as the project gets

launched. Typically, this communication identifies the overall objectives, the importance to the com-

pany, and thanks everyone in advance for their cooperation. A simple communication like this can help

pave the way to success for the project and can eliminate the chance of someone saying “this project is

news to me.”

Other examples of sponsorships include:

• Perhaps your boss handed you the project; make sure that you clearly inform her that you will need

her support soon. • Maybe your boss’s boss came up with this clever idea, and it was passed down to you. If that hap-

pens, find out as quickly as possible from the source of the idea how much help you’re going to get

when it comes to issues such as funding, personnel, and so on.

• If you created the project yourself, after clearly outlining its goals, set about finding out how much

help you’re going to get from others in the company.

You will almost assuredly need help from people outside your department, and you’ll probably need

help from people higher up the corporate ladder. Find out howmuch help there is going to be before you

start making any significant decisions or commitments. Your project may actually be a pet project of

the company president or some other high executive. If so, having this type of sponsorship and backing

can be enormously helpful to you in eliminating roadblocks, particularly as you try to make use of

resources from other parts of the company. If somebody “upstairs” wants everyone to have access

to all business applications from mobile devices, you’re going to need a lot of personnel, time, effort,

and money to make it happen.

Identify the Stakeholders “Project stakeholders are individuals and organizations that are actively involved in the project, or

whose interests may be affected as a result of project execution or completion” (PMBOK, p. 24).

The key word here is the first “or.” Obviously, people and groups working on a project will be affected

by its outcome. But stakeholders are also individuals who don’t work on the project but who are

affected by it directly. You need to identify all the stakeholders in a project. Sometimes this task is a difficult one.

Examples of potential stakeholders in IT projects include:

• The departments and end users that will be directly impacted by the new system.An example of stakeholderswouldbe theAccountingandFinanceuserswhen thenewGeneralLedger systemisput in.

• Those that will be indirectly impacted by the new system. Although the warehouse may be the primary beneficiary of the new inventory system, the way it improves efficiency may also have an

impact on Sales and Shipping and Receiving, as well as the Procurement Group. Further down the

chain it could impact Accounts Receivable and Payables.

108 CHAPTER 4 Project Management

• Oversight groups. Some departments such as HR and Legal oversee activities of the entire com- pany. A project to scan old personnel records into a new document management system is generally

a good idea. However, HR may be concerned about the sensitivity of those documents, who gets

assigned to that task, and who gets proper training, whereas Legal may have thoughts about what it

means for records retention policies. • Direct and indirect sources of funding. Those that are paying for the project have a vested interest

in it. Maybe your department is paying for the required hardware, but other departments are picking

up other project costs (software, consultants, training, etc.).

• Outside vendors.Maybe your company’s adoption of this new software is a bigger deal to the ven- dor than you realize. You might be able to wangle better maintenance agreements as a result.

• Government agencies.Your company’s expansion into a new country may trigger all kinds of reg- ulatory issues that will have to be addressed. In software companies, for example, what constitutes

“non-exportable software” is a big issue. Some cryptographic techniques are prohibited from being

shipped outside of the United States. • Those further up the corporate ladder. Your bosses’ superiors may be using the success of this

project as part of a means of evaluating your boss, or the department, so the reviews of both you and

your manager may be on the line.

Identify the Constraints, Interdependencies, and Risks Projects aren’t easy to manage. If they were, everyone would do it. There are many factors to consider,

many of which are discussed in this section. But note that although some of these factors are under your

control, many are not.

Potential Variables Going into a project, make sure that all the issues and variables that are still uncertain are identified to

all members of the team. Examples of these include:

• Approval of associated costs such as travel expenses for contractors from out of town

• Availability of identified required resources

• Risks such as uncertainty of vendor deliveries or implementation of new technology

• Interdependencies such as the inability to move to a new data center until construction is complete

• Constraints such as the unavailability of resources fromAccounting at the end of the year because of

the priority of year-end closing activities

Possible Solutions You’ll also want to indicate how you’re dealing with those issues. Potential solutions include:

• Associated costs might be shared with other departments that stand to benefit directly from the

project but who aren’t formal members of the team.

• Resource availability might be less of an issue if multiple resources for the same task can be iden-

tified. It sounds easier to do than it is, but sometimes you can find others to cover your bases.

• The risk of implementing new technology can sometimes be mitigated with adequate training and

testing time.

1094.2 Phase one: Scope the project

• Interdependencies can sometimes be addressed by simply alerting the various parties that they are

part of a larger schedule.

• The constraint of resources during the year-end closing can sometimes be addressed via juggling the

scheduling in ways that don’t affect the final deadline.

The Project Charter The Project Charter is the document that really launches a project and covers everything addressed in

the previous sections:

• Scope

• Objectives

• Sponsors and stakeholders

• Constraints, interdependencies, and risks

The Project Charter may also have a formal signature line for sign-off. In addition, it often provides

estimates of the items discussed later in this chapter:

• Time frame estimates • Resource estimates

• Cost estimates

• Roles and responsibilities

Depending on the project, it may warrant investing some time to determine these so that the estimates

just listed are more than educated best guesses.

As mentioned earlier, in addition to identifying what’s in scope in the Project Charter, it could be

very valuable to also identify in this document those areas that are out of scope. When complete, the

Project Charter often becomes the “bible” for the project. It’s the document that everyone references

throughout the life of the project. When there are issues of scope creep, the Project Charter can serve as

a reference to determine what’s in and out of bounds for team members to work on.

Get Historical Perspective Some projects are brand new events with no precedent. But these are the exceptions. Most projects have

some history to them—some kind of background that can help you put the entire venture into

perspective.

• Was a project similar to this one undertaken by the company before? If you are installing the servers

for the new office in London, see if the notes and personnel for the expansion across the street that

was finished last year are still available.

• Do some of your team members have comparable experience you can leverage? If the two techni-

cians who installed the phone system last month are available, can you get them on this team to help

with the network installation? • Does the executive management of the company remember similar work? Does your boss recall the

two previous laptop upgrade projects? If he doesn’t, remind him that in 2011 (and way back in 2008)

it took twice as long as anticipated to get machines in from the field.

110 CHAPTER 4 Project Management

Steps like these can help smooth your project planning and management considerably. For a further

discussion of the value of historical perspectives for projects, see the section “Time Estimates” later in this chapter on page 112.

4.3 PHASE TWO: DEVELOP A PROJECT PLAN Three Critical Components to Any Project Every project has three critical components: time, money, and resources. You will also see this concept

displayed as a triangle (see Figure 4.1).

The point of this graphic is that the interplay of the three characteristics of a project—time, money, resources, and how each relates to the other—directly affects the quality of a project.

For example:

• You might have plenty of time to install a new server (the application it will run won’t be installed for

another month), but if you don’t have enough money (your boss doesn’t want to pay for the high-end

configuration you recommend) or the resources (both technicians who do this work routinely are

gone—one has left the company and the other has been reassigned), the quality of the projectwill suffer.

• Money may not be an issue (“spend whatever you need” was the instruction you heard from your

boss on the new “mission critical” Sales force automation deployment), but if it’s only one person

doing all the work for 200 users and the work must be done “yesterday,” the quality of the project

will suffer.

• You might have all the resources you need (you have five people of your own plus two from the

vendor for installation of a state-of-the-art video conferencing facility), but you haven’t been given

enough money (the whole budget for the setup only included the cost of the hardware and didn’t

consider the cost of installing it) or enough time (people are moving in on Monday—thisMonday), the quality of the project will suffer.

Think about each critical component of a project carefully when developing a project plan.

Quality

Money

Resources

Time

FIGURE 4.1

Three key components of a project.

1114.3 Phase two: Develop a project plan

Write the Project Plan with the Closeout Report in Mind It sounds contradictory to plan the beginning with the end in mind, but in fact, that’s exactly what you

should do to achieve maximum project success. Everything you do, from the first planning meeting to

the final celebration party, should be executed with the final result in mind. If you plan this way, the end

result will force you to constantly act in certain ways, making decisions based on certain criteria. And

that way of working will result in a far better outcome. Specifically, write your Project Plan with what

you want to say in the Closeout Report; see the section “Writing a Closeout Report” on page 121 later in this chapter.

Now that you know what you’ll say at the end of the project, prepare to be ready to say it at the

beginning. Be as specific, actionable, and quantifiable as possible. “Make the Sales department happy”

isn’t actionable, specific, or quantifiable; you may (or may not!) make them happy by executing this

project. Regardless, it will be hard to quantify. In your plan, write a goal such as “install, upgrade, or

refurbish all laptops in the Sales Department by January 1.” When the new year rolls around, you will

be able to say that you have achieved the goal of that project. The guidance given in the section

“Development Plans andGoals” on page 52 inChapter 2,Managing Your IT Team, for developing staff goals can be very helpful for project goals.

Another useful suggestion is to include how much money you will save the company: “upgrading

the Web-hosting facilities will cost the company $10,000 a quarter, but initial estimates are that faster

processing time, more availability, and larger storage capacity will save the company a minimum of

$25,000 per quarter for the first year alone.”

Time Estimates Next, determine how much time this project will take. Determining how much money and how

many people you’ll need is hard, but figuring out how long a particular project will take is even harder.

Most people don’t estimate time well. Some people are excellent at determining the approximate length

of a project, but keep in mind that estimating is a poorly practiced art. Knowing this fact in advance will

help you evaluate not only your skills in this area but estimates you receive from others.

The best place to start with time estimating is to find out if there is history: Has a project like this

been done before? If so, how long did it take? That doesn’t mean that if it took two months to install a

previous version of the operating system across the company that it will take two months this time.

(OS upgrades have gotten much more efficient and people are much more familiar with the process.

But still . . . ) It may not take you the same amount of time as before, but it gives you a framework to operate under.

You have a general idea of how much time this will take. And, when you present your project plan, you

can add that historical data to your report. (“In 2010, it took us twomonths to get everyone up and running

with Windows Vista. We propose to do this new Windows version in three weeks maximum.”)

Sometimes, however, you won’t have a historical record to work from. You will be executing a

project for the first time. In that case, be sure to do two things:

1. Have some basis for your estimate. If you’re essentially guessing that something will take two years, it should be based on estimates of the time required for the component tasks.

2. Overestimate. You’re working with the unknown and you should estimate accordingly. Most peo- ple usually plan for things to go well. You also have to try to account for unforeseen problems,

conflicting priorities, and “unreasonable” demands.

112 CHAPTER 4 Project Management

A helpful way to estimate a project is to get all the key participants in a room to talk about all the things

that have to be done, the order in which they have to be addressed, and approximately how long they

will take. Ask questions such as “And after that will we be done?” or “What exactly do we have to do to get that task done?” Continue to drive things to a finer level of detail and help get all the requirements

and tasks out for discussion.

It’s common to come up with a time estimate as a group—members of your project team (see the

section “Decision-Making Techniques” in this chapter on page 122) will all have opinions about how long a project will take. Some managers take the number proposed and double it. That may sound

devious, but as mentioned before, time estimation is a notoriously difficult thing to do. You’ll be much

happier overestimating than you will underestimating. It seldom occurs that more time is given to an

IT project than is required. It happens, of course, but not very often.

Also remember that when time is estimated, everyone has to factor in that all team members are

seldom working on only one project. They are usually working on this project as well as several others,

in addition to everything else that they have to deal with on a day-to-day basis. For example, a certain

task may only take a few hours to complete, but the employee won’t be able to get to it for a week

because they are already committed to another project.

Resources Required: Employees (Internal and External to IT) For team members who report to you, it’s easy enough to assign them to the project, but you can’t

simply go into other departments and assign individuals to your project. You need to meet with their

department heads and explain your project to them and what resources you’re coming to them for. This

may take a great deal of diplomacy, especially if the various department heads don’t have much of an

interest in your project. It is at times like this that you’ll need to call on your well-defined objectives,

explain how those objectives fit in with the overall company goals, and be ready with an explanation of

how your project positively affects the person you are talking with. When the objectives don’t convince

them, you can either reevaluate your project and objectives or call on your project sponsor to place a

phone call or write a quick e-mail to help dilute the resistance.

Full-Time versus Consultant Employees For a full discussion of the reasons to hire a full-time employee or a consultant, seeChapter 3, Staffing Your IT Team on page 65. The short story is that each has its advantages and disadvantages, depend- ing on the circumstances and need. The nature of the work also helps you determine which kind of

worker is your best choice. One of the advantages of consultants for projects is that they will usually

be dedicated solely to the project, whereas full-time employees usually have many other responsibil-

ities in addition to your project. Also, if a consultant is only needed for the duration of the project, their

assignment can be terminated easily when the project wraps up.

Vendors and Service Providers You may have vendors involved in this project, perhaps on a consulting basis, to implement a new

application or on a support basis. You may also have service providers, such as telecom carriers, that

are critical for getting certain components implemented.

It’s important that you identify all the resources required and identify constraints and parameters of

their involvement. In some cases you may have a resource completely under your direction (such as an

employee or consultant) or you may have limited access (such as a vendor’s technician only being

1134.3 Phase two: Develop a project plan

available to you for two weeks). In some cases you may feel almost helpless regarding certain

resources, such as waiting for your ISP to deliver a new circuit or a hardware vendor to ship a partic-

ularly constrained item.

Money Chapter 6, Managing theMoney on page 161 offers a full discussion on what you need to know as an IT Manager about budgeting. But for project management, you want to be able to identify different

types of costs:

• One-time costs • Ongoing costs • Hidden costs • Consultants

• Internal resources

• Capital versus operating expenses

See the section “Justifying the Costs” on page 132 later in this chapter.

One-Time Costs As the name implies, one-time costs are incurred for those items that require a single outlay of money.

For example, new hardware and software licenses generally represent a one-time cost. Of course, if the

hardware is leased (and there are monthly payments), then it wouldn’t be considered a one-time cost.

Ongoing Costs Ongoing, or recurring costs pertain to those items that are paid for continuously. For example, the

monthly cost for a new telecom circuit is an ongoing cost, as are the maintenance and support costs

related to hardware and software (even though the hardware and software themselves are a one-time

cost). Cloud-based services generally have ongoing monthly costs. Salaries for employees and the costs

of contractors are also ongoing costs.

Hidden Costs In addition to the visible costs of a project, there are many “invisible” costs that will serve you well to

consider. This chapter discusses “hidden” items, such as unnecessary meeting attendance, but there are

others. Consider the loss of productivity the company suffers when an employee is suddenly transferred

to a new project and can no longer work on the tasks he had been doing. Other types of hidden costs can

include costs for certain items that were not fully disclosed by the vendor (e.g., activation fees), or

unplanned items, circumstances, or requirements that impact the cost of the project.

Consultants The cost for consultants is often broken out separately for accounting purposes. As with the aforemen-

tioned costs, consultants may be a one-time cost (e.g., six months of time during implementation) or

perhaps an ongoing cost (e.g., for ongoing support and training).

114 CHAPTER 4 Project Management

Costs of Internal Resources In many companies, the costs of internal resources, primarily staff salaries, are factored into the total

cost of the project. The decision to do this is essentially a policy set by the Finance department, if

they want total project costs to be treated a certain way in the accounting. You should check with them

to see if they want these costs included. If so, you need to determine how far these costs go (e.g., in

addition to salary do they include benefits and cost of overhead such as office space?). Generally, if you

have to account for these costs in your project, there are rules of thumb available from Finance for

calculating them.

Capital versus Operating Expense As a general rule, one-time costs are considered capital expenses, whereas ongoing costs are considered

operating expenses. There may be exceptions to this; for example, one-time costs under a certain

threshold aren’t capitalized. In addition, there may be gray areas as to whether certain costs should

be capitalized. For example, Finance may elect to capitalize the cost of training if it’s exclusively

needed for the project. However, if it’s training that would’ve been taken anyway, it may get treated

differently.

Work with Finance on these issues. You won’t be the first person to ask these questions, and they’ll

understand that they are new issues to you in your new role. Get a good understanding of these policies

the first time and you’ll make everyone’s life easier.

For a further discussion of capital versus operating expenses, see the section “The Difference between Capital Expenditures andOperating Expense Items” inChapter 6,Managing theMoney on page 167.

Roles and Responsibilities A critical element to the success of any project is the clear definition of roles and responsibilities

from the outset. In as much detail as possible at the start, work with everyone on the team to define

all the roles.

Defining everyone’s roles doesn’t mean dictating to people what those roles will be. There will be times where power plays occur or where one person doesn’t want to assume the role that he should.

Plan for the more common occurrence—every player on the teamwants to know exactly what their role

is and what they are responsible for accomplishing.

Confusion about roles is a real project killer. The question, “Who is in charge of the project?” is a

common source of problems, as well as, “I thought I was doing testing.” You won’t be able to answer

every question at the beginning of the project, but you should spend as much time as possible trying to

anticipate any potential trouble areas.

Multiple Projects To further complicate the issue, it’s entirely likely that you, and many others on your team, will be

involved with several projects simultaneously, each of a different size, each at a different point in

its life cycle, and each competing for resources. Not only will you be coordinating the companywide

upgrade to a new accounting system, for example, you may also be overseeing the new operating

system installation for a server, be involved in the purchase of a new phone system for the organization,

1154.3 Phase two: Develop a project plan

and serve on a cross-functional team implementing a new work-from-home program. And every mem-

ber of the various projects you’re working on is also working on other multiple projects themselves.

Not only should you be identifying everyone’s roles, but you should also be estimating what portion

of their time will be expected on your project. In some cases their involvement in the project may come

in batches. One example might have one person with virtually no involvement for the first three

months, but then they will have to give 50 percent of their time for four weeks.

4.4 PHASE THREE: LAUNCH THE PROJECT You have scoped the project and developed a formal project plan; now it’s time to get the project off the

ground.

Range of Launch Options The range of options for launching a project is quite varied. Some projects start off with a brief

memo passed down from your boss: “We are starting a project to upgrade our web site to allow online

shopping.” Not an easy task, but a project has been initiated.

The other extreme might be one ofMicrosoft’s product launches. Microsoft announced it spent over

$100 million on marketing Windows Vista. Launching a new operating system is a monumental task,

but in a similar way, a formal project has been initiated.

Your projects will probably fit somewhere in the middle: You might get more formal notification of

its beginnings (“Let’s meet Friday to discuss the request from Accounting to upgrade their database”)

and a little less than Microsoft’s billions to work with (“We have to keep this project under budget, too,

so let’s make sure the $15,000 number is on everyone’s mind”).

Stage a Kick-Off Meeting It may be wise to enlist your boss when trying to demonstrate the value and importance of your project

to other department heads. Often the senior-most executive who is sponsoring the project will call for a

meeting, along with various department heads, at the beginning of a project. The purpose of a meeting

like this is to (1) make sure that all the various department managers are aware of the importance of the

project and (2) encourage them to commit resources to it as needed. A meeting like this, often called a

kick-off meeting, can be a critical success factor in a project.

A good kick-off meeting will have every member of the team in attendance. The roles and respon-

sibilities can then be defined—ideally in front of the sponsors. Goals, schedules, budgets, and so on can

also be presented to everyone—again in front of everyone. This public accountability (if appropriate

for your project) can be a very effective method to solidify your team’s goals.

Goals of Your Kick-Off Meeting At your kick-off meeting set some ground rules, establish some administrative procedures, and make

sure that everyone is on the same page. Make sure everyone is very clear about the project’s objective

and scope. This is the perfect time to discuss the project’s goals. You have already written them down,

and this first meeting is the place for you to distribute them and make sure everyone buys into them.

116 CHAPTER 4 Project Management

At this same meeting you may want to establish how often and where the project team is going to

meet. A regular schedule of a weekly meeting at the same time, in the same room, is helpful—it sets a

valuable routine.

4.5 PHASE FOUR: TRACK THE PROJECT’S PROGRESS The bigger your project, the harder it is to keep track of who is doing what, how long different tasks will

take, and so on. Several techniques for project management (project meetings, minutes, etc.) are dis-

cussed throughout this book, but these techniques provide more snapshot-type information and fall

short of giving any perspective about the “big picture.” Although many software tools are available

for project management, one in particular, Microsoft Project, has become the predominant choice.

It has become very popular for managing projects of almost any size.

Microsoft Project There are many project management software tools, but Microsoft Project is the most popular. It has

legions of users who would never dream of using any other product. And they can’t imagine why you

would consider using anything else, either. In some companies, using Microsoft Project has achieved a

near-religious status. If you’re working for one of those companies, get used to receiving .mpp files.

Simply entering your project’s information into Microsoft Project is a valuable exercise in itself. It

forces you to think of the specific tasks needed, their dependencies on other tasks, and the times and

resources needed. As you do this, Microsoft Project will alert you when the left hand doesn’t knowwhat

the right hand is doing. For example, if you’ve over-allocated resources, or if time constraints are

exceeded, Microsoft Project will let you know.

By defining to Microsoft Project which tasks can occur simultaneously and which must be done

sequentially, it’s easy to make changes to any portion of the project and have all the dates and resource

allocations updated automatically and see what the impact is.

Microsoft Project also allows you to integrate your data with other time tracking and office pro-

ductivity tools relatively seamlessly.

Remember, however, all the power that Microsoft Project provides can overwhelm you and you can

forget that you are running your project, not Microsoft Project.

HOW FORMAL DO I HAVE TO GET?

Focus your time, energy, andmoney tightly. You don’t have to be very formal about it—not every good projectmanager uses Gantt charts, for example. But you have to manage your project carefully, regardless of how formally you do that.

Whether you are installing a new phone system, taking over the management of a building, or deploying a fleet of brokers to evaluate a potential new marketplace, you have to systematically schedule your efforts and the team members’.

By managing your time lines, you can anticipate when your resources will be slack or overdrawn, when the project will slow down or intensify, and when you need to step in and rearrange things. You need this kind of information, or the project will overwhelm you.

—Peter Hansen Principal, Hansen Realty, Berkeley, CA

1174.5 Phase four: Track the project’s progress

Other Project Management Tools One reason you might consider using a different tool is that Microsoft Project is a sophisticated prod-

uct. It has many features and capabilities, many more than the average person managing projects

would ever use. However, there are many companies that use enterprise project management tools, which can track multiple projects and resource assignments across all of those projects. These tools

can provide the manager with a high-level view of the status of all projects and identify opportunities

to reassign resources among different projects. Examples of enterprise project management tools

include:

• Planview

• Computer Associates Project and Portfolio Management

• Oracle Project Portfolio Management

• Microsoft Project EPM

• IBM Rational Portfolio Manager

• Hewlett-Packard Project and Portfolio Management

Also, Web-based project management tools (Redmine, Tenrox, and KForge are examples) are gaining

popularity. Rather than e-mail files back and forth, users are making changes using their browser to

access an application provider via the Internet, update project plans, and post and share project-related

files. It’s more efficient and convenient. More and more work activities are moving “to the cloud”

in this way. See an extensive discussion of the Cloud in Chapter 11, Connectivity: Social Media, Handhelds, and More, on page 287.

Gantt Charts and Time Lines A Gantt chart allows you to quickly see what is supposed to happen and when. It tracks time along the

horizontal axis. The vertical axis lists all the tasks associated with the project, their start and end dates,

and the resources required.

For an example of a Gantt chart that can be generated fromMicrosoft Project, see Figure 4.2. When

you generate the Gantt chart for a particular project, you and every member of the project team (along

with anyone else who is interested) can see the true scope of it, the time frames, tasks, dependencies,

resource assignments, and such of the entire project. Gantt charts rarely fit on a single page, by the way,

so it is common for the entire report to require a whole wall to view when all the printed pages are taped

together.

PERT Charts and Critical Paths Program Evaluation and Review Technique (PERT) charts or PERT diagrams are graphic representa-

tions of the dependencies between tasks in a project.

PERT is basically a method for analyzing the tasks involved in completing a given project, espe-

cially the time needed to complete each task, and identifying the minimum time needed to complete the

total project.

In Figure 4.3, a circle represents a task start or end and a line between two circles represents the

actual tasks and how they’re related.

118 CHAPTER 4 Project Management

Critical Path One of the more helpful pieces of information from a PERT chart identifies the critical path. The crit- ical path is the series of tasks or events that determine the project’s total duration. In other words, if any

of the tasks on the critical path take longer than expected, then the entire project will be delayed by that

amount of time. Tasks that aren’t on the critical path won’t have the same influence on the overall

project for various reasons (perhaps because they’re done in parallel, as opposed to sequentially).

In Figure 4.3, the critical path consists of tasks A, C, and F. If any of these tasks takes longer than

expected, it will delay the project as a whole. Activities outside the critical path can change (up to a

point) without impacting the entire project. “Slack time” is the term used to indicate how much a non-

critical path task can be delayed without impacting the project as a whole.

Project Milestones Both Gantt and PERT charts allow you to identify and track your tasks. Creating a milestone in your

Gantt chart allows you to add a very useful level of functionality to your project tracking.

FIGURE 4.2

Sample Gantt chart.

1194.5 Phase four: Track the project’s progress

A milestone is a major event in the life of a project. A large project can have many milestones:

Moving your company’s offices from New York to Raleigh will not only have many individual tasks,

but it will also have many milestones. When the decision is officially made, for example (it might

have been bandied around for years), is a milestone. But that will be only the first milestone; when the

new site is selected, when the lease for the new building is signed, when the phones and wiring are

complete, when the data center is ready, when the telecommunication lines are turned up, when office

construction is done, when the first people start working in the new building, and so on, are all

milestones.

Think specifically about what needs to be accomplished to reach your project goal. Begin by break-

ing the objective down into a few milestones. You don’t need a lot of detail here, but divide the project

into a few chunks so that you can begin thinking about the kinds of people you want on the project team,

and maybe begin to develop some perspective on time frames, costs, and other resources.

Updates to Management and the Team One of the things that everyone wants to know about a project is: “How is it going?” Certainly your boss

and the project sponsor want to know this, and the project team needs to be told as well. Oftentimes a

project is so big that team members are only familiar with their own piece and aren’t aware of the over-

all project as a whole.

Task A 3 Weeks

Task D 2 Weeks

Task B 4 Weeks

Task E 2 Weeks

Task F 3 Weeks

Task C 1 Week

FIGURE 4.3

PERT chart.

120 CHAPTER 4 Project Management

Regular project meetings (discussed in the section “Productive Project Meetings” later in this chapter on page 128) can be helpful for keeping members of the team up to date. But these meetings may not be sufficient for everyone; some people are only involved in the project during certain periods,

for example, and therefore don’t attend every meeting. Sending out project status reports and posting

meeting agendas and minutes, as well as a current version of project plans, are two ways of making sure

that everyone has access to data they need.

Summary Updates Gantt charts, PERT charts, critical paths, and so on are useful tools, but the chances are that yourmanager,

the project sponsors, and the stakeholders may not want to see that level of detail. Even your own team

members may not want to wade through all of that just to see if things are on track. Providing regular

updates that summarize progress can be valuable to all. These summaries can include the following topics:

• Accomplishments since the last update

• Mention of those items in progress and whether they’re going faster or slower than expected

• Upcoming activities

• Issues and concerns (perhaps vendor deliveries are taking longer than expected or a key member of

the team resigned recently)

• Overall status: this is the opportunity to identify if things are going as planned or whether you’re

anticipating delays, cost overruns, etc.

Determining the appropriate content, who sees it, and how often these updates go out is a matter of

judgment. For example, a daily report for a two-year-long project may be overkill. It may make more

sense to do it monthly for the first 18 months and then switch to biweekly and weekly as the project

gets closer to implementation. Similarly, the summary just given may be sufficient for your boss, but

perhaps an even briefer summary is appropriate for her boss.

Red, Yellow, Green Indicators Another technique used to keep everyone informed about project status is to use red, yellow, and green

status indicators for key items. Stealing from the traffic light paradigm, they are a simple and effective

way of communicating the status that might otherwise get lost in a verbose explanation. These indicators

are usually included as part of other status reports and are associated with key tasks and milestones.

4.6 PHASE FIVE: CLOSE OUT THE PROJECT Writing a Closeout Report ACloseout Report is the report written at the end of a project. It can be a brief, three-page document or a

50-page, detailed report. It should contain, at minimum, the purpose of the project and how well the

team executed that purpose. Additional components of a Closeout Report can include a brief history of

the project, specific goals accomplished and/or missed, resources used, which aspects went well, and

what lessons were learned from things that didn’t go well.

One simple method of generating a Closeout Report is to take the initial Project Charter—the doc-

ument you worked so hard to create at the beginning of the project—and compare it directly to what you

accomplished during the project. Earlier in this chapter we discussed developing a plan with a Closeout

1214.6 Phase five: Close out the project

Report in mind. For example, say your plan called for the purchase and installation of six new servers in

less than two weeks; you accomplished that, so identify the goal, the step, and the accomplishment.

Name names, specify how much money and time you saved, give credit where it’s due, and pat your

team on the back.

Additional Accomplishments If relevant, add the new uses or new procedures that your project uncovered. Maybe the new system you

installed caught the attention of another department and it’s now serving two purposes. Maybe the au-

tomating of the sales process saved more money than expected, as well as reduced errors. Point these

successes out.

Dealing with Bad News If your Closeout Report contains bad news, be clear about it. Compare it to the Project Charter and try to

identify how things could have been different. Were the goals set too unrealistically? (“Purchase and

install six servers by COB Friday.”) Were you given enough resources? (“You can use one person from

Accounting, but that’s it.”) Don’t point fingers at individuals, but try and learn from the problems:

What are the lessons the company can learn from this project’s disappointment and failures? (“In

the future, changes to the time reporting software will require the involvement of someone from HR.”)

The Need for Follow-Up Activities It’s pretty rare that a project finishes with every loose end tied up. There are often a number of items that

require follow-up. These could be items such as making sure ongoing maintenance is done, the con-

tractors complete all the documentation they promised, and so on.

The completion of projects—the installation of a new billing system, for example—often generates

the need for more training. This training can be identified either while the project is being worked on or

as it’s completed. If the project completion is going to get a critical function working (such as a billing

system), training should be scheduled well in advance to have users ready.

4.7 DECISION-MAKING TECHNIQUES One way to think about the decisions you’ll have to make in your role as a PM is to think about the four

types of decision-making mechanisms you can use. These mechanisms are, naturally, only one of many

ways to approach the issue. How and why people make decisions is a giant field of research. But these

approaches are fairly common methods used to look at the issue.

Four Types of Decision-Making Methods 1. TheMajorityWins.You take a vote and whichever side of the issue gets the most votes wins. This

is certainly the most democratic method, it makes team members feel the most involved, and is

often the perfect solution to some clearly defined, black-or-white types of problems. However,

it can lead to strange decisions (do you really want the team to meet off-site every week?) and

is often not the right method for solving very complex problems. Also, commonly, themost popular approach may not be the best one. Some people may opt for it because it’s the simplest, quickest, or least expensive.

122 CHAPTER 4 Project Management

2. An appointed subcommittee decides or recommends. This technique is good because the com- mittee can gather and analyze detailed facts and present a recommendation to the group as a whole.

It is bad because not everyone is involved in the decision and because even small committees can

get locked up. This approach is excellent for problems that have many components that need to be

researched before a decision is made or for issues that need to be decided quickly and outside of the

large group. The U.S. Senate, for example, has many committees and subcommittees whose func-

tion is to do the often critical preliminary work before presenting an issue to the Senate as a whole.

3. You decide with help from your team. This is often the most efficient and most popular method. Many decisions on a project don’t lend themselves to group dynamics; there is either not enough

time or the issue isn’t all that important to the group (does everyone really have to weigh in on the

font choice for the input screen?), but you can solicit opinions from team members that you know

care about the issue, and are knowledgeable, and then decide. It’s not 100 percent democracy, but

it’s not 100 percent dictatorship, either.

4. Youmake the decision by yourself.Amanager will make plenty of decisions by himself and no one will care. To keep a project moving along, sometimes it’s critical simply tomake a decision andmove

on. (The team lost two programmers on Friday, for example; you decide to contact HR that afternoon

to begin to fill those positions. You know other people in the group feel the positions should be filled

with analysts, but you don’t, and time is ticking away. Make the decision and go forward.)

Some decisions made unilaterally won’t be popularly received, of course, by team members who per-

ceive these as decisions “imposed upon them.” When that happens, you’ll be well served to have a

history of democratic decision making behind you, as well as an explanation about how this particular

decision was made with the project’s ultimate goals in mind. You may not make everyone happy, but if

you do it well, you will be respected.

With the difficult decisions, you may not be sure that the right decision was made, but you can be

sure it was a good decision if:

• All views, concerns, and issues were voiced and discussed

• All alternatives were considered • You can explain (when questioned in the future) the factors and reasoning that led to you deciding

the way you did

Once a decision is made, you shouldn’t feel compelled to revisit it unless some of the key factors related

to it have changed.

4.8 WHAT TO DO IF/WHEN THE PROJECT GETS OFF TRACK Managing time and money are your biggest opportunities to succeed in project management—and your

largest possibilities for failure.Watch them both carefully. This section provides suggestions for how to

deal with the inevitable problems associated with managing time and money.

Regardless of how or why your project is taking more time or money than expected, it’s imperative

to keep the stakeholders (particularly the sponsor and your boss) informed. If you try to cover up the

problem, it will almost assuredly come back to haunt you. Invariably, the problem will eventually sur-

face, and you’ll not only be faulted for the original problem, but also for attempting to cover it up

(which could do more damage to your reputation than simply being late or going over budget).

1234.8 What to do if/when the project gets off track

Some Issues out of Your Control There will be events in every project that are out of anyone’s control:

• People get sick

• Family emergencies come up

• Long-planned vacations arise

• Calls from other departments come in for “your” resources

• Personnel get promoted and move on to other responsibilities • Team members move on to other positions • Vendors fail to meet their commitments • A corporate downsizing is announced

• Severe weather events occur

• Changes in the organizational/management/economic landscape suddenly take place

FOUR TONGUE-IN-CHEEK “LAWS” OF PROJECT MANAGEMENT

Managing projects can be a complex task and most projects run into some difficulty before they are completed. Before discussing how to handle some of these difficulties, it seems appropriate to let you know about the following four “laws” of project management. They are often presented in a tongue-in-cheek way. However, they prove true more often than not:

1. No major project is ever installed on time, within budget, or with the same staff that started it. 2. Projects progress quickly until they become 95 percent complete and then remain 95 percent complete forever. 3. When things are going well, something will go wrong.

a. Corollary: When things can’t get any worse, they will. b. Corollary: When things are going well it’s because you have overlooked something.

4. The 80/20 rule: The first 20 percent of a project schedule completes 80 percent of a project’s goals, but the remaining 20 percent of the project’s goals takes 80 percent of the project schedule.

When a Project Gets behind Schedule If your project falls behind schedule, don’t panic. Consider the following ideas when you see a project

slipping:

• Determine exactly how far behind you are. If you’re using a Gantt chart, for example, you can track which tasks are behind schedule. (Microsoft Project calls them “variances.”)

• Try to isolate the problem.Are you behind on one small, relatively isolated part of the project or is the entire mission going to be late?

• Try to recalibrate. Can the schedule be changed easily? If the task involves one person working on a single piece of the project, can you work with him to reset the timetable?

• Gain perspective. Reset the schedule for the offending task and the entire project may be delayed, but how big a problem is that? If you promised a completion date for a three-month project on Fri-

day, will having things finished a few days later really matter? • Be open to all your teammembers and stakeholders. If time is slipping away, you have a respon-

sibility to everyone to let them know the status of the project, and that the deadline is at

risk. In particular, people reporting to you (team members) need to know what’s really happening.

And people above you (your bosses) need to be kept informed.

124 CHAPTER 4 Project Management

• Lead, don’t just manage.Here is a chance for you to shine as a leader. When you have to let people know about a problem with the project, make it less about assigning blame (don’t say, “We’d be

fine if Jack just pulled his weight,” for example) and more about showing your skills as a leader

(“We are two weeks behind schedule but here is my plan for how we can catch up”). See the section

“Leadership vs. Management” on page 31 of Chapter 2, Managing Your IT Team. • Involve others. When someone alerts you to a problem or delay, ask them for their recommenda-

tions and suggestions on how to deal with it. Of course, you have to be careful with this technique.

Individuals may shy away from identifying problems if they have a sense they’re going to be stuck

with the ownership of resolving it. Share the situation with the whole team and invite suggestions on

how to address it.

• Do some research on the reasons for the delay. The schedule might have been set unrealistically (by you or someone else) at the beginning; if you look into delays as they occur, and you carefully

track them, you will be able to better anticipate problems in the future. • Be aggressive in solving the problem. If you need more time to complete a project, tell people and

get more time. Hoping no one will notice isn’t a strategy for continued success.

Perils of Adding Staff Consider, but don’t automatically decide, adding resources. Some projects are either understaffed from

the outset or suddenly develop a need for further resources in mid-project; adding staff to these tasks

often results in accelerating the project. When adding resources, consider how long it will take a person

to get up to speed and productive on this project.

Other types of projects, however, aren’t well suited to the additional staff fix. Software develop-

ment, famously, rarely benefits from adding developers. Fredrick Brooks, in his groundbreaking book,

TheMythical Man-Month, states his famous law: “Addingmanpower to a late software project makes it later.” Keep in mind that some tasks just can’t be sped up by adding staff. For example, no matter how

many women you assign to the task, it will still take nine months to produce a baby.

Your Project Is Costing More Than Expected Projects run over budget all the time. How far over budget is often the most important issue. Consider these solutions:

• Determine exactly how far over budget you are: $5,000 over on a $300,000 project is not that

important; $5,000 on a $15,000 project is a problem you have to address immediately.

• Do some research on the reasons for the budget overage. The budget might have been set unreal-

istically (by you or someone else) at the beginning; if you look into the overages as they occur and

you track them carefully, you’ll be able to better anticipate problems in the future.

• Be clear to your boss (and other stakeholders involved in the money side of the project) that there is

a problem. A 5 percent variance on dollars can be trivial or critical (depending on the size of the

budget), but most bosses will want to know about that discrepancy. • Adjust the project deliverables. Many projects are redefined as they progress: If your initial project

goal called for all 14 satellite offices to get individual servers, and installation costs on the first five

sent you over budget already, it is time to reevaluate your project goals. All the offices may get their

own servers, but that may not happen until next year, instead of this year.

1254.8 What to do if/when the project gets off track

• Look for “hidden money.” Your project budget may have a contingency budget or your boss may

have money from another project you can use.

Avoid falling into the trap of thinking that you’ll save money later in the project and in the end you’ll

be okay.

4.9 USEFUL PROJECT MANAGEMENT TECHNIQUES As you gain experience for managing projects, you’ll find, discover, and adapt a variety of techniques

that you find helpful. Each project manager does this, and many have adopted styles and techniques

unconsciously, barely aware of how effective they are.

Project Teams Formalizing a group of individuals working loosely together toward a common goal can have tremen-

dous benefits. Calling these people a special group or telling them they are all now members of a

“project team” or a “task force” can solidify a project’s goals and make progress toward those goals

much more evident. When people feel identified with a project, they are much more likely to feel re-

sponsible and accountable for it.

The size and complexity of your project will determine how formal you need to bewith assigning teams:

getting three new sales people up and runningwith laptops, for example,may take a day or two and involve-

ment from several different people in IT at various times, but the task probably doesn’t need a formal team.

Moving your company’s offices, however, is a classic project that benefits from formalizing a team.

Each member has specific tasks, and everyone can have a clear idea of what the goal is and how they

can help with that goal.

Candidates for the Project Team Who are candidates for your project team? Individuals’ involvement on the team can be quite varied.

Some people may be dedicated nearly 100 percent to the project throughout its life. Others may spend

only a small portion of their time on the project. Still others may only be involved with the project

during certain phases. In addition, a project team will probably consist mostly of employees, but there

may also be outside consultants if special expertise or additional resources are needed.

The first people you’ll include on the team are the ones you think it will take to achieve the project’s

goal. As you talkwith these people, theywill offer up suggestions of others that need to be involved. They

will also offer you different perspectives on what it will take to make the project succeed. Some of the

project’s teammembers may be on your staff. Others that you’d like to includemight be your peers, direct

reports of your peers, and individuals from other departments—perhaps some that are senior to you.

While it’s tempting to pick the best and brightest for your project, youmay want to temper that instinct.

Projects are greatmechanisms to allowothers on your staff to shine and to give them the opportunity to show

what they can do. Since the best and brightest are always in high demand, give careful consideration to bal-

ancing your project team with a mix of people that deserve the opportunity to show they can contribute.

Create a War Room For some projects, it has become trendy to have a project room or “war room.” (A movie about Bill

Clinton’s 1992 presidential campaign—a project that used a project room to great effect—is called The War Room.) This room provides teammembers a place to work on the project that is separate from their

126 CHAPTER 4 Project Management

regular work area. The idea of the war room is to keep members from being distracted from the project

by their regular duties and to increase communication (and hopefully productivity, quality, etc.) by

having the team members near each other. Lately, war rooms aren’t complete unless they also include

a whole host of toys (Koosh balls, hacky sacks, Nerf games, etc.), a whiteboard, an endless supply of

munchies and soft drinks, and “open” seating so that team members can communicate easily.

Formalized Project Frameworks Chapter 8, Security and Compliance, has a section called “Methodologies and Frameworks” on page 238. A number of these, such as IT Infrastructure Library (ITIL), ISO 9000, Six Sigma, and CapabilityMaturityModel Integration (CMMI), have aspects and techniques that you can apply to your

projects to help ensure quality and that goals are met and for managing/tracking progress.

Participate in the Project Yourself Consider participating in the project yourself—give yourself tasks to do besides managing the project.

While managing the project is often a full-time job, if team members see you working on the project, it

inspires them. Plus, it gives you greater insight to the project, as well as your staff’s activities. Until the

late 1990s, for example, Bill Gates contributed directly to Excel’s code.

Offer Project Perks Group lunches, team T-shirts, coffee mugs, or milestone achievement awards—think of ideas to keep

your team active and involved. Consider small rewards along the project timeline (weekly team meet-

ing small prize drawings, for example) instead of awards at the end. Company-paid doughnuts have a

very attractive cost-in-exchange-for-information ratio and often get people to meetings.

THE FLYING PIG AWARD

At our company, we have a challenging project—one that some people say we will complete “only when pigs fly.” Every month we have an all-hands meeting where we present a “Flying Pig” award and certificate. The flying pig is

aceramicpig that thewinner isallowedtokeepforamonth—until someoneelse“wins”(earns) it.Teammembersnominate potential awardees. People post the certificate in their cubes and sign and decorate the pig when their month is up.

—Karen Hitchcock Business Analyst

Give Your Project a Code Name “Operation First Falcon” sounds a lot more exciting and important than “Operation General Ledger.”

For projects that are large enough, create a code name and a project logo, put them on polo shirts, and

you’ll be flooded with requests for people to join your project. (Not necessarily the people you want on

the project, but that’s a different problem.) Use the logo and name on documents pertaining to the

project to help create a sense of identity and branding.

1274.9 Useful project management techniques

Productive Project Meetings Okay, now you have the project team, or at least the first cut at the project team. The next thing you

want is to get all the team members together. Work to make sure every one of your meetings is as ef-

fective as it can be. Information should be shared, issues discussed, decisions made, and action items

determined.

• Set clear goals in your first project meeting: document the objective and scope of the project, how

frequently meetings will be held, have minutes taken, and so on. • Holding a successful project team meeting involves several simple but effective meeting tech-

niques. These methods are discussed here; use them to increase the productivity of your meetings

and your team.

• Don’t forget that you’re in control, and therefore responsible, for the success of both the meetings

and the overall project. Watch both carefully.

Meeting Agendas Typically, each project meeting will follow a consistent format. Develop one that seems to work well

for you and your team and that everyone is comfortable with. Typical areas for a project meeting

agenda might include the following:

• Status review of open items and action items from previous meeting

• Decisions and agreements from previous meeting restated • Review of overall status of project and discussion of any major issues • Updates from each subteam or team member • Accomplishments of note

• Key tasks and milestones coming up

You will also want to use the meetings for special events. For example, it may be an opportunity to

demo a recently completed application component or it may be the right place for a vendor to demo

a product that may be appropriate for the project. Alternatively, if the project hits a snag or a partic-

ularly important decision needs to be made, the agenda can set aside time for an in-depth discussion of

the issues.

Minutes of the Meetings Have minutes taken so that there is no disagreement on items that were decided, tasks that were

assigned, etc. Minutes should also include accomplishments, areas of concern and problems, updates

on time frames, and so on. The minutes should be distributed to all team members and project sponsors

as soon as possible after the meeting occurs—and certainly before the next meeting. Taking and dis-

tributing minutes can be painful tasks that can be easily forgotten or ignored; they can also be critical to

the long-term success of the project.

As manager of the project, it’s your job to make sure these tasks get done. Youmay get volunteers to

take minutes or you may not get any. A popular technique is to rotate this assignment each meeting or

decide that the person who shows up last for the meeting is the one assigned to take minutes. (This can be a clever way of making sure people arrive on time.) Among other things, the minutes ensure that

everyone is aware of how the project is progressing.

128 CHAPTER 4 Project Management

The minutes may also give senior executives an idea of when they need to get involved; they may

decide to rally the troops, motivate, or buy lunch for everyone because a milestone is met. Minutes can

chart the progress of activities and tasks fromweek to week and serve as a reminder of things that need to

be done. The minutes can also document who is responsible for each item. Too often, especially in large

project teams, it’s too easy for everyone to think “someone else” will take care of it. Although several

people may be working on an item, it’s important to identify a single person as the one to take the lead.

The minutes should reflect the key items of the meetings, such as decisions, issues, and project sta-

tus. For the meeting minutes, consider using the ideas discussed in this chapter and in the section

“Updates to Management and the Team” on page 120. Each meeting’s minutes should follow the same format so that people know where to look to find the information they need.

The Hidden Cost of Meetings There are, of course, the visible costs of meetings: booking rooms, video conferencing, maybe you all

will have to fly to a common city to meet, the cost of setting up and training on the Web conferencing

software, doughnuts, and so on.

But the largest cost of meetings isn’t often calculated. One way to think about meetings is to total up the hourly wage of every person attending the meeting. This cost is seldom considered, but it should be computed every time. If it were done each time, far fewer meetings would be held and far fewer at-

tendees would be invited. Right now, you are inviting the VP from Sales because she is a stakeholder

and you want to do the correct political thing; she may be attending because it allows her to meet with

your boss before the meeting. In fact, perhaps she shouldn’t be invited and wouldn’t miss attending; if

properly informed, she can get the status of your project from your weekly update e-mail and you can

get more done with fewer (non-contributing) people in the room.

Next time, run the numbers and see how much the company is paying for everyone to be in that

room. If the meeting has to be held out of town, these calculations are routinely (in these more

ROI-conscious times) done. However, “inside the office,” far too many meetings with too many non-

essential personnel are still held.

Project Meeting Options There are now a variety of ways for your entire project team to meet:

• Face to face. While this is still the most common and often the best option, it is sometimes completely impractical. Even people down the hall from you can’t always attend meetings in per-

son, much less the Help Desk team in India (with your group in New York).

• Videoconferencing. The price for this option has plummeted. Many companies now have web cameras and speaker phones available for employees. Even an occasional videoconference at a

rental facility can save radical money over airfare and hotels for all participants. Larger companies

often have their own video conferencing facilities.

• Conference calls. This is now a very common andmore accepted alternative to other types of meet- ings. Cell phones now come equipped with “conference” buttons. Conference calls, however, have

two drawbacks: they tend to drag on, and because people aren’t being watched, they can do other

things while in the meeting. “Do other things” often means checking e-mail, but it can mean other,

more distracting things, too. Some conference calls participants are 100 percent there; some aren’t

even 25 percent engaged.

1294.9 Useful project management techniques

• Online meeting services. Tools such as Cisco’s WebEx, Citrix’s GoToMeeting, Adobe’s Connect, and Microsoft’s Live Meeting, used in conjunction with a conference call, can help facilitate online

meetings and training, allowing you to do presentations, demo applications, poll attendees, white-

board, and more. These tools allow you to do real-time collaboration so that you can pass a doc-

ument (or control of your desktop) over to another participant on the call. Because these services are

available from many resellers, you don’t need to build your own infrastructure to host them.

Useful Meeting Techniques At each meeting, review the minutes of the previous meeting. It’s a good way to remind everyone about

accomplishments and to re-review any action items that were still pending or unresolved at the end of

last week’s meeting.

• Stating the desired length of the meeting up front can be an effective technique for getting people to

participate. If everyone knows that the goal is to finish the meeting in one hour, people will make

more of an effort to get to the point (and will try to force those who don’t to cut things short). • Meetings held earlier in the day are more productive than those when people are tired after a full

day’s work; however, many critical project meetings are held at the end of the day to have a daily

project meeting update.

4.10 FUNDING PROJECTS In general, when it comes to IT projects, the concerns are primarily about “hard” dollars. Hard and soft

money are economic and budgeting concepts. The definitions may vary from organization to organi-

zation, but for the most part, “hard” costs are those that the company has to write a check for (hardware,

software, outside consultants, etc.). “Soft” costs refer to costs that are less concrete (office space, use of

existing staff, time, etc.). When corporate management wants to know how much a project is going to

cost, they often only care about hard costs. However, at times, it may be advantageous to add in the soft

costs (e.g., when you’re trying to make a project look more impressive in a press release or on your

resume). In addition, referring to the soft costs will demonstrate to management that you’re aware that

the use of existing resources costs the company money as well.

Your best source for determining a project’s costs might be the members of the project team. It was

their expertise that led you to select them for the team; tap this same expertise to evaluate costs. However,

it’s very possible that team members may only be able to provide you with information about the tech-

nologies that will be required, but not the costs of these technologies. This isn’t unusual. Many technical

personnel aren’t interested in, or aren’t exposed to, the business side of the technology. When you face

this situation, you may have to go on the Web or contact the vendors and manufacturers directly to get

estimates on the products your teammembers identified. In some cases, a project teammay include some-

one solely dedicated to tracking the project’s budget and other administrative activities.

Estimating Costs: Go High As a general rule, projects always exceed their initial cost estimates. As a result, it’s common for project

managers to inflate their cost estimates by factors of 10 percent or more, sometimes a lot more. There

are several reasons for this. When estimating costs, it’s not unusual for smaller, miscellaneous items to

130 CHAPTER 4 Project Management

be overlooked as everyone focuses on the big expenses. However, these miscellaneous items can add

up to a significant amount.

• If management balks at the total cost, the inflation factor provides you with some room to revise the

estimate downward without (in theory) impacting the success of the project.

• If the cost estimate is going to be wrong, err on the side of making it too high rather than too low. If it

ends up too low, you will end up in the embarrassing position of having to admit your poor planning

and shortsightedness and asking for more money.

The inflation factor gives a PM an opportunity to look like a hero if he can complete the project for less

than was estimated. Then again, wildly padding your estimate simply to ensure that you come in under

budget can negatively impact your credibility in the eyes of management, as well as the credibility of

the IT department.

Projects Always Cost More Than Estimated There are many costs to include within any IT project. In addition to the obvious costs of hardware and

software, others common costs to consider include vendor support costs, travel, installation costs, an-

nual licenses and maintenance, physical plant expenses (raised floor, air conditioning), training, tele-

communications, books and manuals, user group fees, trade shows, software utilities, test equipment

and environments, parallel testing, integration costs, incentives for project team members, consultants,

and so on. Also, don’t forget some money for the Nerf balls, munchies, sodas, and pizzas for working

during lunch or late into the night.

Exactly Who Is Going to Pay for It? If the company is going to pay for all the costs you’ve estimated for this project, someone has to figure

out where the money is going to come from. More than likely, the company’s budget, as well as your

department’s budget, has already been set. And unless someone built enough padding into either of

these to cover your new project’s expenses, it’s likely that your project may cause your department,

as well as others, to go over budget.

This dilemma may not be as big a problem as it initially seems. If corporate management approves

your project and costs, then the various department heads will have your project as a ready justification

when they have to explain their overruns. If the project is sponsored or initiated by a very high-level

executive, she may direct you to charge all the project’s costs to a special department code that she is

responsible for, which alleviates everyone else’s concerns about their own budgets.

Some companies may choose to set up special “chargeback codes” for projects so that it’s easier to

track the total costs. This is especially true for very large projects. This means that other departmental

budgets aren’t impacted by the project, and it also presents a convenient way to track the project’s costs.

Then again, when such a special code exists (sometimes jokingly referred to as a “slush fund”), it can be

very tempting to use it for items that have only a tangential relationship to the project. For smaller

projects, individual departments may be instructed to “eat” the costs as part of their regular budget.

It’s important that you know how upper management wants to pay for the costs associated with your

project so that there are no surprises and that your project doesn’t make enemies among other depart-

ment heads at the same time you’re trying to develop allies.

1314.10 Funding projects

Justifying the Costs No matter who initiated the project, sooner or later you’re going to have to defend the costs. If you’re

the one who initiated the idea for the project, you may have to justify the project even before you know

the costs. The most efficient means of justifying your costs is to try to show a clear Return on Invest-

ment (ROI) for your project. For example, if you wanted to implement a pool of shared printers, you

could easily justify the costs by demonstrating that the company will no longer have to pay for indi-

vidual printers at each desk and workstation. Keep in mind that justifying the costs is usually very

closely aligned with justifying the project. Very often, when trying to justify the costs, you have to

look no further than the project objective and its justification to find what you need.

Often, the justification may consist of a variety of intangibles that are hard to quantify. In the printer

pool example used earlier, you could also cite that it would simplify the inventorying of toner and spare

replacements parts.

First, here is a list of the more tangible benefits:

• Improved productivity and efficiencies (faster and/or less expensive)

• Reduced costs (fewer dollars/resources needed to accomplish the same task) • Increased revenue • Meeting changing demands of the marketplace • Less waste (materials, time, resources)

• Reduced head count (in these more politically correct times, it’s better to phrase this in more sensitive

terms: “reallocation of existing staff to other company areas” or “eliminate the need to add to staff”)

• Compliance with legislative regulations (tax laws, environmental issues, safety regulations, etc.)

Next is a list of the less tangible benefits:

• Increased advantage over competition • Improved customer relations • Better company/product/brand awareness

• Higher quality

• Improved staff morale

• Greater convenience (for staff, customers, business partners)

Both of these lists can come in handy when defining your project charter. Think of the project’s

justification as the answer you give to people when they ask, “Why should we do this?” and later when

they ask, “Why are we doing this?”, and finally when they ask “Why did we do this?”

4.11 MULTIPLE PROJECTS: HOW TO JUGGLE THEM WELL You Will Have Multiple Projects There are some IT Managers who work on a single project 40 hours a week, but they are the exception.

Almost every manager, and certainly almost everyone in IT doing project management, has to juggle

multiple projects. Some may be small, some may be due later in the year, but almost everyone is jug-

gling more than one project. You may decide that an enterprise project management tool (discussed on

page 118 of this chapter) is the sort of thing you need to help manage multiple projects.

132 CHAPTER 4 Project Management

Prioritize by Time and Money Some projects are huge. “Huge” depends on the size of your organization, of course, but if they need

75 percent of your time, be clear to yourself and others that this is where you’ll be spending most of

your time and effort.

Sorting tasks by time is a common technique: if you have a relatively low priority task that is due

tomorrow but a high-value task that is due in two months, you can accomplish both by doing the lower

priority one first. But that is the simple case. More often the problem is juggling two competing

projects, both “due yesterday.” You’ll become a radically better manager of projects if you can take

situations like this and convert them to your advantage: evaluate each project and determine which one

has the highest priority. Make that determination and act clearly upon it.

Prioritize by Politics Why kid around? Some projects are simply more important because they are politically more impor-

tant. If your boss wants all of his executives to have webcams, you are going to do this before you install

the new network printer downstairs. Be clear about your tasks and tell your boss about your other pri-

orities; often they won’t care, but sometimes they’ll adjust their needs when informed of your con-

flicts—the new network printer required downstairs may be for a department he’s trying to appease.

4.12 DEALING WITH NON-IT DEPARTMENTS ON A PROJECT It’s important to remember that IT is a service organization: it exists not to test out the latest hardware

and software (although that is definitely a perk), but to provide computing capabilities to other groups

within the company.

Working with other groups in the company is inevitably going to mean having non-IT members

on a project. In that situation, three basic issues will arise: how do you motivate individuals you aren’t

managing, which department is in charge, and how do we charge our time?

Motivating Employees outside of Your Department This situation isn’t always a problem: most project members are willing and capable performers. Many

see the task defined, see their roles as part of the bigger picture, and perform admirably.

Others, however, do not. Also, employees that don’t play well with others are hardly unique to

IT-managed projects. There are two actions you can take in this situation: emphasize the company’s

overall goals to that individual (“when this project wins, we all win”) and, if more drastic measures are

required, speak privately with the person’s manager. If more direct managerial actions are required to

get the desired employee performance, let the correct manager handle the situation. You wouldn’t want

some other manager “handling” your employees.

Who Is in Charge? Some projects will never resolve this issue, but most will. And you can save everyone a lot of headaches

by addressing this issue as quickly as possible. Bring the point up in the introductory meetings, at the

funding meetings, and at the kick-off meeting. Get the issue settled as fast as possible.

1334.12 Dealing with non-IT departments on a project

One common scenario is one department (e.g., IT) working with another (e.g., Sales). Both depart-

ments have vested interests in the success of the project and the time and money investments are the

same. But one of the department heads has a much more domineering personality; this individual is

very vocal about his needs and those of his department.

If you find yourself in this situation, from the beginning you must be clear to your team members, his team members, and the two or three people up the ladder that you both report to that this will be a

50–50 project in terms of decisions.When you’re clear to everyone about that, be clear that you will “go

upstairs” as required, and the people upstairs know it and everyone on the team knows it.

4.13 Further References Websites www.ca.com/us/project-portfolio-management.aspx (enterprise project management tool vendor). www.hp.com (enterprise project manager tool vendor). www-01.ibm.com/software/awdtools/portfolio (enterprise project manager tool vendor). software.isixsigma.com/newsletter (Six Sigma—quality control implementation methodology). www.kforgeproject.com (web-based project management tool). www.mercury.com/us/products/it-governance-center/projectmanagement (enterprise project management

tool vendor).

www.microsoft.com/project/en/us/solutions.aspx (enterprise project management tool vendor). www.oracle.com/us/solutions/project-management/index.html (enterprise project management tool vendor). www.planview.com (enterprise project management tool vendor). www.pmi.org (Project Management Institute). www.redmine.com (web-based project management tool). www.tenrox.com (web-based project management tool).

Books and Articles Berkun, S., 2008. Making Things Happen: Mastering Project Management. O’Reilly Media.

Brooks, F., 1995. The Mythical Man-Month. Addison-Wesley Professional.

Geracie, G., 2010. Take Charge Product Management. Actuation Press.

Kendrick, T., 2010. The Project Management Tool Kit: 100 Tips and Techniques for Getting the Job Done Right.

Amacom.

Marchewka, J.T., 2009. Information Technology Project Management. Wiley.

Philips, J., 2010. IT Project Management: On Track from Start to Finish, third ed. McGraw-Hill Osborne Media.

Project Management Institute, 2008. A Guide to the Project Management Body of Knowledge: Pmbok Guide.

Project Management Institute.

Roberts, P., 2011. Effective Project Management: Identify and Manage Risks; Plan and Budget; Keep Projects

under Control. Kogan Page.

Simon, Bruce, Webster, Phil, F., 2010. Why New Systems Fail: An Insider’s Guide to Successful IT Projects.

Course Technology PTR.

Swanborg, R., 2011. Winning Ways to Project Success. CIO Magazine August 1.

Wysocki, R.K., 2009. Effective Project Management: Traditional, Agile, Extreme. Wiley.

134 CHAPTER 4 Project Management

CHAPTER

Software, Operating Systems, and Enterprise Applications 5

A computer will do what you tell it to do, but that may be much different

from what you had in mind.

Joseph Weizenbaum, Artificial Intelligence Pioneer

CHAPTER TABLE OF CONTENTS

5.1 Types of Software..........................................................................................................................135

5.2 Operating Systems.........................................................................................................................137

5.3 Open Source .................................................................................................................................141

5.4 Managing Software .......................................................................................................................142

5.5 Cloud Computing ...........................................................................................................................148

5.6 Enterprise Applications..................................................................................................................152

5.7 Enterprise Resource Planning (ERP) ...............................................................................................157

5.8 Further References ........................................................................................................................159

Although software has never been a simple item to categorize, these days there are many more types of

software and many more methods of managing them. This chapter discusses some of the major types

software: operating systems (OS), database management systems, enterprise applications, business ap-

plications, middleware, productivity tools, utilities, and security. It talks about how to manage them

successfully (including purchasing, management, licensing, and tracking), as well as computing in

the cloud.

5.1 TYPES OF SOFTWARE In general, software is categorized according to its use.

• Database Management Systems (DBMS): Data are the heart and soul of IT, and its most valuable asset. While all data are in a database, a DBMS is used for administering data. The DBMS is

the interface to the database and can control access, maintain integrity to minimize corruption,

adjust the structure of the database to match changing business needs, perform transaction process-

ing (Online Transaction Processing; OLTP), and generate reports (Online Analytical Processing;

IT Manager’s Handbook.

© 2012 William Holtsnider & Brian D. Jaffe. Published by Elsevier, Inc. All rights reserved. 135

OLAP). Enterprise DBMS solutions include MySQL, Oracle, Microsoft’s SQL Server, and IBM’s

DB2. There are also small-scale DBMS offerings such as Microsoft’s Access and FileMaker Pro.

• Operating systems: There are now essentially three main operating systems: Windows, MacOS, and the family of Linux/Unix variants. For a full discussion of operating systems, see the section

“Operating Systems” on page 137 later in this chapter. • Business applications: This is a catchall term to refer to those software packages that allow

the users and the business to do their job(s). This might be a warehouse inventory system, the

payroll application, or a simple application that allows administrative assistants to print mailing

labels.

• Enterprise applications: These applications are those that are used by virtually every part of an organization and act as a way of integrating systems, users, and functions. Enterprise applications

may include business applications (such as an ERP system from SAP or Oracle), as well as some-

thing like companywide e-mail. They’re discussed in detail in the section “Enterprise Applications” on page 152.

• Middleware: This software connects other software. This type of software can encompass every- thing from formal middleware products (such as Oracle’s Fusion, IBM’sWebSphere, and RedHat’s

JBoss software) that are packaged, sold, and installed as distinct units, to a few hundred lines of code

custom written to connect one proprietary piece of software to another. Middleware is sometimes

referred to as an “interface” or a “hook.”

• Client/server: This is a reference to an application’s architecture, not to its function. A client/server application has two pieces of software associated with it: one that sits on the server and does the vast

majority of the processing and the other piece that the user (or client) accesses that serves as the user

interface. E-mail (such as Microsoft’s Exchange or IBM’s Lotus Notes) is an example of a client/

server. The client portion is the software that allows users to read, write, and manage their e-mails.

The server portion is the part that moves mail along between users, provides administration tools for

the IT staff, controls security, allows for the creation of policies (such as mail retention), etc.

Enterprise resource planning (ERP) applications are also examples of client/server-architected

solutions. It should also be pointed out that very often the “client” is only a browser. • Productivity tools: This industry-accepted term refers to common desktop applications such as

word processing, spreadsheets, and presentation. Productivity tools are either sold in suites or

as stand-alone components. Microsoft Office is the best known of these, but alternatives include

Corel’s WordPerfect Office, Apple’s iWork, and the free open source software from OpenOffice

and KOffice.

• Utility tools: This large category can include items for tasks strictly associated with the IT staff (e.g., backup, monitoring, management, and administration), as well as those that might be used

by the end users (e.g., file compression, file conversion). • Security: This category of software can refer to a variety of solutions that protect the environment

(firewall, antivirus, anti-spam, user authentication, encryption, VPN). • Development tools: These items include all elements of software used to create other software,

such as compilers, linkers, debuggers, source code control systems, and languages.

As you can see, some of these categories overlap. A solution such as Oracle Financials could be

simultaneously categorized as an enterprise application, a business application, and a client/server

solution.

136 CHAPTER 5 Software, Operating Systems, and Enterprise Applications

5.2 OPERATING SYSTEMS Without an OS, a computer isn’t much more than a door stop. Operating systems have a long and

interesting history that includes some familiar names (Unix, Windows, Linux, Mac OS) and some for-

gotten ones (DOS, CP/M, VMS, Netware, TRS-DOS, OS/2). A particularly exciting new area of the OS

market is the handheld industry with offerings from RIM, Apple, Hewlett-Packard, Microsoft, Nokia,

and Google; these are covered inChapter 11, Connectivity: Social Media, Handhelds, andMore on page 287.

There are three major offerings for desktop and server operating systems: Windows, Mac OS, and

Linux/Unix variants.

Windows Microsoft’s offerings dominate both the server market (Windows Server 2003 and 2008) and the desk-

top market (Windows XP, Vista, and Windows 7). Windows has also made inroads in the smart phone

market with Windows Phone, but has not been as successful here. The lion’s share of the workstations

on the planet are using some version of Windows. Version 1.0 of Windows was released in 1985 and

there have been many versions released since. Because it’s so popular, most application vendors will

first write their software to support Windows; many won’t even consider writing their application on

any other OS platforms. However, because of its prevalence, it is also the preferred platform for hackers

and virus creators to go after.

Mac The long-time, though distant, runner-up to Windows for the desktop is the Macintosh operating sys-

tem. This operating system has many die-hard adherents; its demise has been predicted unsuccessfully

for many years. Mac is the de facto OS used by certain industries, primarily those associated with audio/

video media, design, graphic arts, and so on. Since 2001, with the release of version 10 (code-named

“Cheetah”) of the Mac operating system, Apple has been using Unix as the underlying foundation of

its graphical user interface. Although mostly known as a desktop operating system, there is a server

version of the Mac-OS as well.

The Mac platform’s percentage of market share has always been in the single digits, but it has been

growing steadily. IDC Research showed that in 2010 Apple’s shipment to enterprise customers was

only 2 percent of all enterprise PC shipments. In addition, many people look to Apple as the leader

in hardware, software, and user-interface design and innovation. Some of Apple’s challenges with

making further inroads into the enterprise environment include:

• Lack of tools for managing in large environments • No product roadmaps to help IT managers make decisions • Mac versions of enterprise applications may not exist, or lag behind the Windows versions

Apple has also produced the iOS operating system, which is for its handheld and tablet devices. See

Chapter 11, Connectivity: Social Media, Handhelds, and More on page 287 for further discussion on the Apple OS (iOS). The success of the iPhone and the iPad have radically changed the discussions

about which is the dominant operating system.

1375.2 Operating systems

Unix Variants and Linux Unix and its variants have quite a history, which started in the 1960s and 1970s at AT&T’s Bell Labs.

Big names in this market include HP-UX from Hewlett-Packard and AIX from IBM, but it’s Linux that

has made real headway in gaining market share. Both IBM and Hewlett-Packard now sell and support

Linux running on their hardware and with many of their application offerings.

Linux is an open source operating system developed by Linus Torvalds in 1991. The system is

a Unix variant and has been distributed freely since its creation, although “free” in this context is a com-

plicated concept. For a further discussion of free software known as Open Source Software (OSS),

see the section “Open Source” on page 141 later in this chapter.

Choosing an Operating System You probably already have multiple operating systems in your environment. Although it would be nice

to standardize on one, it is rarely possible anymore. It’s important to keep in mind that you really don’t

“choose” operating systems directly. It’s a decision that is made almost indirectly based on other fac-

tors and issues. Specifically, which applications your company uses, which hardware (workstations,

servers, handheld, and mobile devices) you need to support, and what the specific needs of your users

are often determine which operating system(s) you’re using.

Applications in Your Environment Many major desktop business applications are now available on all three platforms. There are equiv-

alent open source applications for Microsoft’s Office suite, as well as applications available “in the

cloud.” MS Office itself has a version for the cloud, known as Office 365. (For more about cloud com-

puting, see Chapter 11, Connectivity: Social Media, Handhelds, and More on page 287.) Server applications may run on only one or two platforms, though. For example, the server software for

SAP is available to run on Unix or Windows, but not Mac. However, the client front end for SAP

is available for Mac desktops. Sometimes you hit brick walls like Apple’s iOS not supporting Adobe Flash, or Microsoft’s Internet Explorer 9 not supported on Windows XP.

The key issue here is which nonstandard applications are you going to run? Many companies run large collections of custom software applications to run their business. Situations like these make keep-

ing the previous operating system preferable because changing to a new operating system, or adding

another one to the environment, can be a significant undertaking.

Typically, most of the operating system choices you face will be related to the server side of

the environment and will come about when consideration is given to bringing a new application into

the organization. Factors to consider here include:

• The skill set of your staff, along with the cost, effort, and time involved to develop expertise in a

new OS.

• Which business applications you will be running and which operating system(s) they run on. • Performance/cost concerns: The application may run faster on one operating system as compared to

another, but that performance difference could be mitigated with the choice of hardware. • Compatibility with the rest of your environment: If the tools you use to maintain your environment

(backup, antivirus, encryption, monitoring, etc.) are operating system specific, the cost and effort of

having to support another operating system could be enormous.

138 CHAPTER 5 Software, Operating Systems, and Enterprise Applications

A 2011 InformationWeek survey of IT professionals showed that the top criteria for choosing an operating system were:

• Support for existing applications

• Security of the operating system

• Specific functionality of the device and operating system

• Integration with existing security and management tools

Customers’ Needs As discussed inChapter 1, The Role of an ITManager, in the section “DetermineWho Your Team Members Are” on page 11, determining who your users are (and who their customers are) will make you a much more productive IT Manager. Choosing operating systems is no exception to this rule.

Consider what the de facto standard is for your customers. If a user community (e.g., the graphic arts

department or the elementary school you are supporting) runs on the Mac platform, it will be much

more efficient in both the short and the long term if you choose Macs for everyone. This will eliminate

problems with sharing files, compatibility, and so on. It will also radically cut down on your training

and equipment costs, as users can share their knowledge and their machines among each other.

Multiple Operating Systems It’s common now to have multiple OSes in one company, despite corporate efforts to keep everyone on

one platform. A 2011 InformationWeek survey showed that 85 percent of IT organizations officially support more than one OS (with the average supporting three), and 65 percent of IT organizations allow

one or more additional OSes that are not officially supported. A big part of this has been the growth of

mobile devices with their own operating systems. Users sometimes go their own way. Supporting three

platforms in one environment, of course, can be a difficult task. Here are some ways of dealing with

mixed environments.

Operating System Emulators A number of tools and products have been developed to allow applications developed for one operating

system to run on another operating system. This can help eliminate the need for users to have two dif-

ferent workstations. While emulators are very convenient, they can create additional challenges for

support. Just as there are nuances and idiosyncrasies with applications and operating systems (version,

components, setting, hardware, etc.), an emulator can complicate things further by adding another layer

into the mix. For example, when an application isn’t working right, is it because of the application, the

core operating system, or the emulator? Perhaps it’s how these are configured or how they interact with

each other.

Virtual Machines Virtualization allows you to take a single physical device (e.g., one workstation or server) and run mul-

tiple instances of operating systems. Each of these instances looks and operates as its own device, but

because they coexist on a single physical device, they are considered to be virtual machines. Even if one of the instances should crash, the remaining operating system instances will continue to run. With

virtual machine technology, all instances of the various operating systems run simultaneously, and

switching among them is fast and easy.

1395.2 Operating systems

Uses The virtual machine offerings designed for clients are convenient for a number of scenarios. If your

environment has to support multiple operating systems, virtual machine software can be used by:

• Your Help Desk and support staff so that they can use a single piece of hardware to run different

operating systems comparable to what different users have. In this way, the support staff can rep-

licate the user’s environment when providing support. • End users during operating systemmigration. If a particular business application isn’t yet supported

by more current versions of an operating system, it can challenge efforts to move the whole orga-

nization to the later OS version. By using virtual machine software, all users can be migrated to the

new OS, and legacy applications can be run on an instance of an older OS.

• The training room PCs can run various instances of operating systems, each configured similarly to

various user scenarios. This allows the trainers to easily provide training that replicates the various

user environments. • Software developers and testers can use virtual machine technology to test their applications easily

from varying workstation configurations and environments.

Virtual machine offerings for servers also have distinct benefits and are quickly being embraced by

organizations as a way to efficiently consolidate servers. By consolidating servers, the investment

in hardware can be reduced. But, perhaps one of the most significant advantages is that it requires less

physical space in the data center, and also less cooling and electricity. Virtual machines also let IT

quickly create new environments for testing and development without having to buy new hardware.

Server environments that are virtualized can be moved easily and quickly to different hardware, which

greatly simplifies the effort of optimizing the resources and moving applications to more current

hardware.

Also, legacy applications can be run on virtual servers without having to set aside dedicated hard-

ware environments for them. It is important to note that with the growing popularity of virtualization,

many software vendors have included specific references to this technology in their licensing agree-

ments so that if you have multiple copies of their software running on virtualized servers, you need to be

sure that each instance is licensed properly. The most popular solutions for virtualization are VMware

from EMC and Hyper-V from Microsoft.

Virtual Desktop Infrastructure (VDI) An offshoot of the virtual machines is the virtual desktop infrastructure (VDI). With VDI, end-users

are given “thin” clients (e.g., low-end workstations, netbooks, and even tablet devices). The real horse-

power resides on the VM sessions that have the tools and software the users need. They use these

devices to access a virtual workstation environment that is hosted in the data center in a server farm.

The benefit behind VDI is that the user-devices are inexpensive, with little configuration and software

associated with them, almost like dumb-terminals of mainframe days, and the VMs are more easily

managed since they are centralized. The user has the identical experiences with access to files and pro-

grams regardless of where they are, and the device in front of them. The number of VMs can be easily

scaled to adjust to a changing workforce so that the environment and investment is optimized.

However, so far the ROI on VDI has been somewhat illusory. Case studies have shown that the

upfront costs can be very high, and that there have been problems with user acceptance, performance,

and issues with software application compatibility in virtual environments.

140 CHAPTER 5 Software, Operating Systems, and Enterprise Applications

5.3 OPEN SOURCE For many, many years, there was the Microsoft world of software and then there was everyone else’s

world. While the Redmond giant still owns a large portion of some very large markets, and many

individual companies have made inroads into individual markets, it’s the Open Source movement that

has the largest impact on Microsoft’s share of the operating system market in recent years.

Definition Open Source Software (OSS) is software (both operating systems as well as applications) created by the

worldwide user community. It isn’t owned, developed, or supported by any one company, much less

one person. Many individuals, organizations, and companies around the world develop, install, and

support OSS, but the software itself isn’t theirs and they don’t charge anything for it.

Because the source code for OSS is available for all to see and change at will, there is a certain fear

of “who is in control?” In the Open Source movement, the concept of a “benevolent dictator” is rec-

ognized as the person in control. While there could be hundreds or thousands of people suggesting fixes

and enhancements to the product, it’s the benevolent dictator that evaluates them and makes the de-

termination as to which will be adopted and when. Of course, that won’t stop people from making their

own fixes and enhancements; it just means they won’t be part of the “official” code. Linus Torvalds is

generally recognized as Linux’s benevolent dictator. For the pros and cons of Open Source, see

Table 5.1.

Table 5.1 Pros and Cons of OSS

PRO CON

Initial cost is low or nonexistent. Depending on how it’s obtained in your organization, there may be no formal support for the product.

Adherents claim many open source products are simpler and easier to use.

Many companies are afraid that without an “identified” owner, or if they haven’t paid for the software, there will be no one to turn to when they need help (i.e., vendor support). That’s why purchasing “distributions” of Open Source (such as the one from Red Hat) is a common option—the vendor also can provide support (for a fee, of course).

Major corporations, such as IBM and Hewlett- Packard, are supporting and offering Linux solutions, bringing legitimacy to the once fledgling movement.

Detractors of OSS say the software is often harder to use and missing important features.

Because the source code of OSS is available to all, there are more eyes looking at it, which increases the chances that bugs and security flaws will be found (and fixed). In theory, this makes OSS more reliable.

Some are concerned that since OSS code is free (i.e., no “profit”), there is little incentive for anyone to enhance it, add features, etc.

The success of the product depends on the collaboration of hundreds of people around the planet. This is too much risk for some companies to accept. There are many conflicting studies as to which OS is more reliable and secure.

1415.3 Open source

Cost All OSS is “free.” That is, there is no charge for the software itself. However, within the OSS genre

there are “distributions” (or “distros”) that cost money to buy. In the OSS world, a distribution is a

collection of OSS software already configured, compiled, and ready to install. These distributions

are put together by a third party and are sometimes preferred to the original OSS code because the third

party is willing to provide support. Red Hat is the best known example of a Linux distribution. Many

companies prefer to use distributions because there is comfort in knowing that an identifiable party

(as opposed to the “OSS community”) is responsible for support.

However, whether free via OSS or paying for distribution, the costs of software are much more

than the initial expense; when evaluating the purchase of software, you must consider Total Cost of

Ownership (TCO). Typical TCO considerations include the long-term components of a purchase, such

as installation, training, and financing.

5.4 MANAGING SOFTWARE Managing software is a critical component of an IT Manager’s work. There are several key issues and

some very useful tools to help the manager cope with those issues. With the pace of advances and the

development of software applications, features, and functionality, software is becoming more of a

dynamic asset.

Total Cost of Ownership (TCO) Purchasing software is an activity that can range from a simple retail purchase of a graphics tool or a

download of a file compression utility to a complex, months-long, meeting-filled, companywide pro-

cess of buying an Enterprise Resource Planning solution. However, the purchase price isn’t the only

cost associated with software.

The TCO concept is this: When you are considering buying an asset (e.g., a computer, a car, a

house) you should consider not only the initial purchase price—for example, say a business application

will cost the department $10,000—but all the costs associated with that purchase over the life of the

asset. There will be costs associated with the time to install the application, as well as hardware asso-

ciated with it, vendor maintenance/support fees each year, staff salaries, training costs, and so on as-

sociated with running that application. TCO is as applicable to hardware as it is to software. TCO is

discussed in more detail in “TCO and Asset Management:What Are They?” inChapter 7, Getting Started with the Technical Environment on page 196.

Software Management Techniques Deployment One of the most complicated issues related to desktops and laptops in the large corporate environment

is the deployment of software. When there is a new software package to be implemented or an update

(no matter how minor) to an existing application, the manual distribution and installation can be a very

tedious and labor-intensive process. Ensuring that all workstations are comparably set up and main-

tained can drain a great deal of IT’s resources.

142 CHAPTER 5 Software, Operating Systems, and Enterprise Applications

To streamline this situation, there are several concepts that many environments (small and large)

have seized upon. They’re gaining in popularity and quickly becoming standard practice:

• Developing a standard disk image

• Selecting a disk cloning package

• Implementing a software deployment tool

• Users download from the IT intranet site

• Locking down the desktop

Develop a Standard Disk Image Every organization should create a disk image that will essentially serve as a way of ensuring that each

workstation’s software is set up and configured as similarly as possible. This can reduce a technician’s

troubleshooting time significantly. Ideally, there will be only one standard image in an environment,

but it is common to have more than one for different department needs, types of users, and so on.

Select a Disk Cloning Package A disk cloning package uses very sophisticated techniques to quickly copy large amounts of data in a

fraction of the time it would take to use conventional methods. Once the master disk image is made, it’s

possible to duplicate it to other workstations in a matter of minutes. In larger environments, where there

is a constant influx of new computers arriving at the loading dock, a disk cloning package can save an

enormous amount of time in putting your standard disk image on new computers (or when you redeploy

computers). Also, because it creates an identical duplicate, it virtually eliminates any errors that might

creep into a manual effort. Popular disk cloning solutions include Ghost from Symantec, and Snap

Deploy from Acronis.

Implement a Software Deployment Tool While a standard disk image, along with a cloning tool, ensures that everyone has a similar software

configuration when a new workstation is deployed, it does nothing to help with updating software or

adding software. Numerous tools are available to help with the deployment of software (e.g., LANDesk,

Symantec’s Altiris, Microsoft’s SCCM, Casper from JAMF). These tools operate in a very similar

fashion by allowing you to “script” the installation process for a software update—be it as complex

as a new companywide application or as small as an updated printer driver. Other alternatives for deploy-

ing software include running scripts when users login, and features of Microsoft’s Active Directory.

Users Download Software from an Intranet A very common method of deploying software—and one that allows for the user to “pull” the software

at their own convenience rather than have it “pushed” to themwhen they don’t need it—is to have users

download software from an intranet. This method is particularly useful for software that not every user

needs; every user will need Microsoft Word, for example, but most won’t need MS Project, much less

that $5,000-per-seat tool the Finance department bought.

You can direct users to your IT intranet site to install these packages. A script or installer program

you configure will ensure that the software is installed the way you want. This method allows IT to very

efficiently deploy software that only a percentage of the entire user base will need. Some of the de-

ployment tools mentioned earlier provide for this sort of self-service functionality for software

installations.

1435.4 Managing software

Locking down the Desktop Many organizations now try to limit a user’s capabilities to make troublesome changes by “locking

down” the desktop. Typically, this may mean that the user can’t install new programs, alter network

settings, or change the way the operating system is configured. Similarly, it prevents the user from

deleting key programs and files and from stopping vital operating system services. However, even with

a locked-down desktop, you can still give the user the flexibility to alter personal settings, such as se-

lection of wallpaper, default printer, screen saver, colors, and fonts. A number of applications, such as

the Group Policy feature of Microsoft’s Active Directory, let you define and manage these policies

centrally. There is additional discussion on flexibility related to standards and the locked-down desktop

in Chapter 10, Working with Users on page 263.

Software Licensing There are two general types of software licenses: free and for-profit. Initial portions of examples of both

types, the GNU and Microsoft licenses, are shown in the boxes.

HOW GNU DEFINES FREE SOFTWARE

“Free software” is amatter of liberty, not price. To understand the concept, you should think of free as in free speech, not as in free beer.

Free software is a matter of the users’ freedom to run, copy, distribute, study, change, and improve the software. More precisely, it refers to four kinds of freedom for the users of the software:

• The freedom to run the program, for any purpose (freedom 0). • The freedom to study how the programworks and adapt it to your needs (freedom1). Access to the source code is a

precondition for this. • The freedom to redistribute copies so that you can help your neighbor (freedom 2). • The freedom to improve the program and release your improvements (and modified versions in general) to the

public so that the whole community benefits (freedom 3). Access to the source code is a precondition for this.

A program is free software if users have all of these freedoms. Thus, you should be free to redistribute copies, either with or without modifications, either gratis or charging a fee for distribution, to anyone anywhere. Being free to do these things means (among other things) that you do not have to ask or pay for permission.

Source: www.gnu.org/philosophy/free-sw.html

SCOPE OF LICENSE SECTION FROM A MICROSOFT END USER LICENSE AGREEMENT (EULA)

“The software is licensed, not sold. This agreement only gives you some rights to use the features included in the software edition you licensed. Microsoft reserves all other rights. Unless applicable law gives you more rights despite this limitation, you may use the software only as expressly permitted in this agreement. In doing so, you must comply with any technical limitations in the software that only allow you to use it in certain ways. You may not

• work around any technical limitations in the software; • reverse engineer, decompile or disassemble the software, except and only to the extent that applicable law

expressly permits, despite this limitation; • use components of the software to run applications not running on the software;

Continued

144 CHAPTER 5 Software, Operating Systems, and Enterprise Applications

SCOPE OF LICENSE SECTION FROM A MICROSOFT END USER LICENSE AGREEMENT (EULA)—Cont’d

• make more copies of the software than specified in this agreement or allowed by applicable law, despite this limitation;

• publish the software for others to copy; • rent, lease or lend the software; or • use the software for commercial software hosting services.”

Source: Microsoft Windows 7 Home Premium EULA

As you can see, even from these small portions of these agreements, some software licensing terms can

be rather complex and also quite lengthy.

Licensing Issues In general, corporations seldom consciously engage in illegal activities. They also generally respect

intellectual property copyright laws. However, due to complexities of licensing agreements and the

volume of purchase activity, it can be difficult for an IT Manager to fully know if his company is

licensed properly for all its software.

There are numerous cases of small companies being subjected to a software audit based on a call

from a single disgruntled employee to one of the software industry trade groups (e.g., Business Soft-

ware Alliance or the Software and Information Industry Association).

Countless hours and resources have been expended by companies to deliver the documentation and

proof of appropriate licenses requested. Companies consider themselves fortunate if it’s determined

that the illegal licensing discovered was unintentional and that the company had been making a good

faith effort to be legal. In cases like this, there may be no fines or punitive damages. However, the

company will have to pay the license fees for all the unlicensed software that was discovered or agree

to delete all the unlicensed software.

In fact, it isn’t unusual for a company to find out that it’s over-licensed on some products and under-

licensed on others. Under-licensing usually occurs with software that isn’t “standard” on every PC. For

non-standard software, it’s very easy for the purchase of the license to be overlooked and forgotten by

the administrative staff. In such a case, the technical staff may seek to satisfy a user’s request and install

an unlicensed software copy and neglect to inform the administrative staff to purchase the license.

The process of keeping track of software licenses is often referred to as “software metering.” There

are some general guidelines that you as an IT Manager should be aware of to avoid putting your com-

pany at risk for copyright infringement.

• Understand that when you buy a software license, what you’re usually buying is the right to use a

copy of the software; the vendor usually remains the actual owner of the software. • Read and understand the licenses that come with your software. Because license terms can change,

review them periodically. If they’re complex (and most of them today are very complex), pass them

along to the Legal department for review. Your vendor and software reseller can also help explain

the terms.

1455.4 Managing software

• Don’t expect to be able to negotiate a change with your software’s vendor (although larger orga-

nizations may have some success here). If the software you’re buying isn’t an off-the-shelf or

shrink-wrapped package, you’ll have better chances. See the section “Negotiating Licenses” on page 147.

Licensing Models and Types To complicate matters further, there are several different licensing models and types of licenses that a

vendor may offer. Vendors may define these differently from one another, and may not offer all types.

The most common are discussed here:

• Concurrent user licensing. With this type of licensing, you only have to buy enough licenses to match the number of users who will be logged into the application at the same time. If you have

100 users that use the warehouse inventory application, but only 20 are using it at any one time,

you’d only have to buy 20 licenses.

• Per seat licensing. With per seat licensing, you have to purchase a license for each user who has access to the application. In the warehouse inventory example just given, you’d have to buy

100 licenses.

• Per server licensing.With per server licensing, you license the server software, not the users. There may also be tiers of server licensing; for example, some sever products are licensed based on the

number of processors installed on the server or on the number of users who will access it. • Multiple tier licensing. In some cases, you may need to buy licenses for both the server and the

user(s). For example, with Microsoft’s SQL licensing with per server licensing, you license the

server software as well as the users. But a different offering for SQL requires only the server

to be licensed. With Microsoft’s Exchange, you have to buy an Exchange license for the server,

Outlook licenses for the desktop client, and an Exchange CAL (client access license).

• Multiple use or home use licenses. Some licenses allow a single license of the software to be used on each user workstation (e.g., the one in the office, the one at home, and the one on her laptop in her

briefcase), as long as these copies aren’t used by others, or concurrently. • Internal or external uses. Depending on your planned use for the software, there may be different

types of licenses. For example, if you’re buying software to host your company’s intranet, that may be

one type of license. However, if you’re hosting data for others to access, it may be a different license.

• Virtual machines. When using software in a virtual environment, be sure that your software is licensed properly for each virtual machine. This is a relatively new area for software licensing,

and many vendors are still clarifying their licensing requirements here. • Non-perpetual licensing. Most software licenses are perpetual, which means you pay for it once

and then you own it. With non-perpetual (sometimes known as subscription, annual, or renewable)

licenses, you pay a fee each year to use it for the next 12 months. Once you stop paying, you have to

stop using the software. With these licenses you are essentially renting the software, as opposed to

owning it. When computing in the cloud (see the section “Cloud Computing” on page 148 of this chapter) you are usually renting the software.

The issues around licensing are growing very complex as vendors simultaneously tighten the terms and

conditions and offer different options and alternatives. When trying to determine the different types of

licenses you have to buy, be sure to ask lots of questions and ask the vendor to show you where their

verbal answers are documented in their licensing agreement(s).

146 CHAPTER 5 Software, Operating Systems, and Enterprise Applications

Maintenance and Support Plans In addition to buying a license, vendors also sell upgrade or maintenance plans that entitle you to

upgrade (at little or a reduced cost) to newer versions of the software as they come out. The value

of these plans depends on how often the vendor expects to provide new versions and how often

you expect to be interested in these newer versions. Keep in mind that a vendor may also offer a support

program, which entitles you to technical support on a product but doesn’t include providing you with

upgrades. Alternatively, buying into a plan for upgrades may not include support. Check with your

vendor and make sure you understand what you’re buying before you buy it.

Negotiating Licenses While you probably won’t be able to negotiate the specific terms of the license, it’s entirely likely you

can negotiate a volume discount based on the license quantities you intend to buy. Use your network of

contacts to find out what other organizations are paying. The larger your purchase, the more room you

have to negotiate on price. You may also have success negotiating additional licensing rights (such as

home use) with your purchase. You may also be able to negotiate some free training from the vendor in

order to seal the deal. Remember to look at the total purchase of licenses, support maintenance, train-

ing, and any professional services and negotiate. You may be able to upgrade or extend your support

from the vendor (e.g., from “bronze” to “silver”) at no cost.

Be wary of agreements that automatically renew support and/or maintenance services unless you

notify the vendor in writing. You can usually ask to have this provision removed. If the vendor refuses,

you can get around the issue by handing him a written notice that you don’t intend to renew at the same

time you give him the original order.

Let your company’s legal resources review the terms of any software license you buy. In all like-

lihood, your company’s lawyer will say that the license has numerous unfavorable terms and that he

recommends against entering into such an agreement. However, he is also likely to add that he recog-

nizes that there is no real alternative. Negotiating with vendors is also discussed in the section

“Reviewing Contracts with Vendors” on page 175 in Chapter 6, Managing the Money.

Get Organized Whenever possible, consolidate all your software purchases. Many large software retailers have sys-

tems in place designed to help companies keep track of their license purchases, their obligations,

expirations, and so on. In a crisis or emergency situation, you may feel that the only solution is to install

a copy of a software package that hasn’t been paid for. If you choose to go this route, you should ensure

that a proper license is ordered and purchased at the same time.

With all the licensing options and permutations available, it can be an administrative chore to track

the licenses you have and to make sure that when you’re buying additional licenses, upgrades, or soft-

ware and maintenance plans that you’re doing it for the licenses you actually own.

Keep records of your license purchases: quantities, dates, vendors, and so on. For licenses that

need to be renewed periodically, keep track of the start and end dates, and the same for support

and upgrade plans. It is not unusual for organizations to get letters and inquiries from their software

vendors’ compliance department, or from a software vendor association, about the legitimacy of

the licenses in use. Having good documentation readily available can go a long way to help ensure

a simple inquiry doesn’t turn into an audit or legal matter. Make sure that everyone in IT is fully

aware that it’s against the law and company policy to pirate software. Advise users that it’s against

1475.4 Managing software

company policy to bootleg software, and any unauthorized software will be immediately deleted

when found.

5.5 CLOUD COMPUTING “Cloud computing” or “computing in the cloud” refers to making use of resources on the Internet

(i.e., the “cloud”). These resources can include servers, data centers, storage, and applications.

Also, these resources can generally be accessed only using a web browser. The advantages of cloud

computing is that it dramatically reduces, sometimes even eliminates, associated infrastructure

costs. While cloud computing is often quickly adopted by small start-ups that don’t have the capital

to invest in IT resources, it has made significant inroads into established organizations as well. Cloud

computing is also seen as a solution that will help control internal IT staffing levels, although 49 percent

of IT leaders in a 2011CIOMagazine survey said that cloud deployments wouldn’t affect IT headcount.

The Many Flavors of Cloud Computing If you are familiar with any of the Internet e-mail solutions (e.g., Yahoo, Gmail, HotMail) you already

have a sense of cloud computing. For these, all you need is a web browser and an Internet connection

and you have full access to your e-mail. Everything else you need to be fully functional with these

vendors’ e-mail solutions exists on the Internet. These solutions have grown to include address books

and calendars. Google also has its Google Docs and Google Apps offerings, to include the ability to

create, store, edit, and post spreadsheets, presentations, and word processing documents online. Take a

moment to note how significant this is. Using Google Apps, a user can do most of the most common

productivity tasks without having to purchase any end-user software. Not only does this reduce the

software costs, but it also eliminates all the tasks and costs traditionally associated with end-user pro-

ductivity tools (e.g., deployment, upgrades, patching, licensing, purchasing). It also reduces the burden

of IT regarding centralized storage, servers, backup, and so on.

However, it’s important to note that cloud computing does not always refer to free solutions. Some-

times it’s free, and sometimes it isn’t. Generally, cloud computing offerings are free for individual per-

sonal use, but come at a cost for business uses. One example is the Google Docs offering mentioned

earlier. While all those features and functions are free, Google also offers a premiere edition (Google

Apps), for business users at a cost of $50/year/user with additional features and functionality targeted to

a business (e.g., more storage, data migration, phone support, shared e-mail distribution lists, greater

access control options, shared calendaring). The list of vendors in the cloud computing space is grow-

ing dramatically with various offerings from names such as Microsoft, Amazon, Oracle, Rackspace,

Salesforce.com, and IBM.

Taking things to the next level are business apps that are available via cloud computing. Best known

here is Salesforce.com, which has a suite of business applications for sales, customer service and sup-

port, sales analytics, marketing, and so on. These apps are all accessed using only a browser from

Internet-connected devices (including smart phones and tablets). All of the usual infrastructure

requirements (servers, data centers, management, upgrades, security, backups, databases, etc.) become

the responsibility of the provider. Other applications that are making inroads into cloud computing are

Human Resources Information Systems (HRIS), payroll, accounting, and content management.

148 CHAPTER 5 Software, Operating Systems, and Enterprise Applications

Because managing e-mail can be so mission critical, burdensome, and complex, many companies are

now offering Microsoft’s Exchange e-mail solution via the Internet as a way to shift that burden away

from individual IT departments.

As a fairly new industry, cloud computing comes in different flavors, with different terms—some of

which overlap:

• Infrastructure as a Service (IaaS) refers to offerings of servers, storage, Internet connectivity, firewalls, routers, switches, etc.

• Platform as a Service (PaaS) refers to a solution that not only provides the hardware infrastructure, but also the software and development platforms for your team to build, install, and maintain ap-

plications. PaaS offerings also include version control, testing tools and environments, and ability to

roll out and roll back different versions.

• Software as a Service (SaaS), software may be browser based or installed on workstations. However, the distinction with SaaS vs. traditional software is that you pay for actual use as op-

posed to individual licenses. This shifts software to more of a variable operating expense, as

opposed to a fixed capital expense. Google Docs and Apps, Salesforce.com, Success Factors,

NetSuite, and Microsoft’s Office 365 are popular providers of various SaaS offerings. SaaS

may not always be for end-users; back-end services (like e-mail anti-spam/anti-virus) can also

be an SaaS offering.

• On-demand computing, a catchall term that refers to the concept of providing computing re- sources as they are needed, as opposed to the traditional full-time basis. Also sometimes referred

to as “utility computing.” Amazon’s Elastic Compute Cloud (EC2) is a popular vendor for on-

demand computing.

• Grid computing refers to leveraging the processing power of a large number of networked com- puters for large-scale computations. This usually has the most relevance in the scientific commu-

nities. Also sometimes referred to as “distributed computing.”

There can be overlap in some of the terms and models presented here, and definitions may be slightly

different among providers. The coauthors of this book used cloud computing—they built a web site on

Google Sites—to collaborate on manuscripts.

For some of the pros and cons of cloud computing, see Table 5.2.

Many of the same considerations and factors associated with choosing an outsource provider (see

the section “Outsourcing andOffshoring” inChapter 6, Managing theMoney on page 182) go into decisions about computing in the cloud.

Private versus Public Cloud The cloud solutions that were described earlier are examples of public clouds—they are there for

anyone or any organization that wants to pay. An alternative is a “private cloud.” Private clouds

are attempts by very large organizations to leverage their significant IT resources to essentially offer

on-demand/cloud-like offerings to their internal customers and subsidiaries, as a way to provide

services in a more efficient, flexible, and scalable manner.

A hybrid of the public and private clouds is the virtual private cloud (VPC). The VPC essentially

uses the public cloud model, but the cloud provider logically segregates your resources from its other

1495.5 Cloud computing

customers using technologies like VLANs and other security solutions so that the resources from the

cloud provider seem like an extension of your own network.

Some organizations are more comfortable using a VPC model, since it offers additional security

provisions for their initial forays into cloud solutions.

Considerations When Moving to the Cloud While the cloud solution for IT resources can be very attractive, it is not without potential hurdles and

pitfalls. The industry is still very new, and everyone is learning as they go. In time, things will stabilize

and become more standardized, but until then make sure you do careful investigation and evaluation

before moving to the cloud:

Table 5.2 Pros and Cons of Cloud Computing

PRO CON

Pay only for services you use. Tied to the vendor. Raises concerns about vendor’s viability or issues if you need to change providers, migrate data, etc.

No capital outlay for software and/or hardware. No direct costs associated with maintenance, upgrades, support, etc. (All of these are generally bundled in with the service cost.)

Lack of control. You may have little or no say regarding operations, future direction of software, etc.

Vendor’s dedicated staff for service and support around the clock. Because the vendor is directly vested in the success of this model and their offerings and are able to leverage resources and tools on a grander scale, they may be in a better position to monitor/manage the resources than you could internally.

Resources may be configurable by you, the customer, but not entirely customizable.

Shifts a great many of IT traditional responsibilities (deployments, upgrades, patching, monitoring, etc.) to the vendor.

Long-term ongoing costs may approach costs for maintaining in-house resources.

As a result of the vendor’s focus on reliability, availability, and redundancy, it may often provide built-in business continuity and disaster recovering solutions for your enterprise.

May be complex options to choose from (e.g., dedicated vs. virtual resources), making the cost analysis difficult to evaluate.

A variety of offerings giving you a great deal of flexibility.

Could be complex (or impossible) to integrate across multiple on-demand/cloud-computing vendors, systems, applications.

Since you’re generally just paying for use of the application, which the vendor is monitoring, the concerns of licensing and auditing are almost eliminated.

Concerns about security, privacy, and meeting your organization’s compliance and requirements needs.

Easy to adjust to changing needs, cycles (e.g., when additional storage is needed, it is available virtually immediately).

With all resources managed and operated by a third party, you have no control over availability and reliability.

Who actually owns the resources, particularly the data?

150 CHAPTER 5 Software, Operating Systems, and Enterprise Applications

• Data Retention for Software as a Service (SaaS). Is your data being kept indefinitely? Or will it be archived/purged after a period of time?

• Backup for Infrastructure and Platform as a Service (IaaS and PaaS). If you have an applica- tion or database in the cloud, you may be the one responsible to make sure it gets backed up. If you

accidentally delete a file, you’ll be the one to do the restore. Typically, backups for IaaS and PaaS

are done by using additional storage from your cloud vendor. • Licensing. Which software and licenses are you responsible for, and what is your vendor

providing?

• Data location. In which country will your data be stored? This may be an issue for some regulatory and privacy concerns as well as which encryption software you use.

• Vendor support. What sort of Service Level Agreements (SLAs) will your vendor commit to? If there is an extended outage will you get a credit? Is their support team responsive? What kind of

tools do they have to help you manage, monitor, and troubleshoot? For SaaS models, will your end-

users be calling the cloud provider for support or your IT team? • Term of agreement. Do you have to commit to a multiyear contract upfront? What if you want to

get out early? If you do want to leave your cloud provider what about issues of migrating/transi-

tioning data, applications, services back to your organization or to another provider?

• Organizational.What impact will it have on your team?Will roles be eliminated or changed? Will new positions be needed to focus on cloud operations and activities?

• Standardization. If your environment has unique requirements, or nonstandard/traditional config- urations, will you be able to replicate that in the cloud?Most cloud vendors allow you a very defined

degree of flexibility—will that be sufficient? • Operations tasks. Who is responsible for installing software? Applying patches and upgrades?

Monitoring and management of the resources? These can vary greatly between the IaaS, PaaS,

and SaaS models.

• Billing and invoicing. Does the provider offer sufficient detail and reporting so that you can fully understand the bills? Which tools are in place for you to ensure that your team isn’t using on-

demand services needlessly (like the programmer who requests some virtual servers and storage

for some testing in an IaaS model, but then forgets to delete them, incurring 10 months of usage

fees)? What happens if you are late with a payment—is your service cut off? • Liability for breeches. What responsibility will your provider agree to in case there is a security

breech?

• Recovery/redundancy. What sort of capabilities/facilities does the provider have in case of fail- ures/outages?

• Protection of data.Most cloud vendors consider data security to be a top priority. But how can you be sure they are doing everything they say they are doing, or that you need them to do? For example,

if they say that firewalls are configured to prohibit certain types/sources of traffic, will they show

you those configurations? • Network connectivity. Do you have sufficient bandwidth at all your locations if your applications

are moved to the cloud?

• Return on Investment (ROI). It’s entirely possible that a long-term cloud-based solution may be more expensive that hosting the solution yourself. However, cloud-computing still offers great ad-

vantages in terms of flexibility, scalability, and other conveniences that make it worthwhile. In fact,

a 2011CIOMagazine survey found that 48 percent of IT leaders are evaluating cloud options before making any new IT investments.

1515.5 Cloud computing

Some of the concerns on this list will vary (or even disappear) depending on the model of cloud service

you’re using (e.g., SaaS, PaaS, IaaS). However, the list should give you a sense of the issues associated

with cloud computing.

Cloud computing is a very new area, and most organizations are just beginning to explore and think

about how it can be used. A 2011 industry survey by Baseline Magazine shows that the cloud is viewed with many benefits as well as challenges (see Table 5.3).

5.6 ENTERPRISE APPLICATIONS An “enterprise application” is an application that is widely used throughout the organization and in-

tegrates the operations of many different departments and functions. Enterprise applications are very

valuable but can be very complex pieces of software. They require extensive planning to implement

and can be very expensive.

For large companies, with hundreds and thousands of users, the value of connecting all of their func-

tions is enormous, but so are the tasks of implementing and administering the software. This chapter

discusses several enterprise applications: e-mail, directory services, and enterprise resource planning.

E-mail When organizations are doing their disaster recovery planning, one of the applications that is almost

always deemed mission critical is e-mail. E-mail has become the lifeblood of communications for vir-

tually all organizations. For a task as simple as seeing if a colleague is free for lunch, many will reach

first for the keyboard as opposed to the telephone.

Table 5.3 Benefits and Challenges of Cloud Computing

Top Benefits and Challenges of Cloud Computing from 2011 Baseline Magazine Survey (in order of importance)

Benefits Challenges

Increased flexibility/versatility Preventing unauthorized data access

Increased scalability Preventing data loss

Lower fixed costs for whole organization Service costs that are rising or may rise

Reduced demand on IT staff Risk of occasional data unavailability

Reduced maintenance/migration costs Handling risk of slower applications

Increased data security Makes regulatory compliance more difficult

Reduced demand on hardware Less ability to customize

Increased user productivity Uncertainty of cloud vendor’s staying power

Happier users Possibility of data being stored offshore

Centralization of organization’s fixed costs Risks of higher migration costs

More user access to high volume IT resources Legal risk of losing document versions

Easier compliance None of these

Source: Currier, Guy, Speeding the Cloud, Baseline Magazine, May/June 2011

152 CHAPTER 5 Software, Operating Systems, and Enterprise Applications

Usage Statistics A report by the Radicati Group published in 2011 revealed some interesting information about e-mail:

• There are 3.1 billion e-mail accounts around the world.

• Corporate users send and receive 105 messages per day on average (33 sent, 72 received).

Educate Your Users on the Key Principles of E-mail You (or the Training department, if you have one) can offer a class on the e-mail system you use and

tips for effective communication. What you need to get across to all your users are some simple prin-

ciples of using e-mail that are less software oriented and more usage oriented.

• Keep it brief. If you don’t like reading long e-mails, what makes you think others do? • Make the subject line count. Be as clear in this line as possible. Instead of using “meeting” as your

subject line, use something more meaningful, such as “operations review status meeting.”

• Reply to all e-mails that expect one.Not every e-mail that is sent needs a reply, but many do. If you send something to somebody, you expect a reply. Provide the same courtesy.

• Differentiate TO: and CC: recipients. As a general rule, people on the TO line are people who need to know and/or have to take action with the content of the message. People who are CC’d

(which stands for carbon copy, a technology that predates photocopy machines) are generally get-

ting the information on an FYI basis. • Use the Reply All button with extreme caution. This button is probably the largest contributor to

e-mail waste.

• Spell-check all e-mails.All e-mail programs have a function that allows e-mail to be spell-checked automatically. Activate it.

• When stressed or angry, don’t press the Send button.Wait until you’ve had a chance to cool off so that your e-mail isn’t overly emotional.

• Define policies and guidelines for saving e-mail. How do you want users to save their e-mails? Is there a company policy? Provide your users with a specific plan. Do you want them to store up a

month’s worth on their hard drive or archive to the network? Your e-mail system has features to help

you manage this. You can automatically purge e-mail that reaches a certain age and limit the size of

a message, as well as the size of a user’s mailbox.

In addition to telling users that they can delete their old e-mail, you should tell them that their e-mail is

backed up daily so that they don’t feel the need to save every minor note.

Managing E-mail Because e-mail can quickly get out of control, it needs to be managed aggressively. Managing it can

become a large part of your day; if you have a large company, it can become the sole responsibility of a

team of people. A number of vendors offer solutions for monitoring e-mail and addressing issues such

as spam and viruses. In addition to the following ideas, important aspects related to e-mail are discussed

throughout Chapter 8, Security and Compliance on page 205.

Junk Mail (Spam, Chain Letters, Phishing, Jokes, etc.) Although e-mail can be a very valuable tool for circulating vital information very quickly, it can dis-

tribute junk just as fast. If someone receives an e-mail of a joke or a spiritual message that they like,

they can circulate it to one person—or thousands—with just a few clicks of the mouse. Although it may

seem innocent at first, the growth can be exponential, resulting in massive storage requirements for

1535.6 Enterprise applications

e-mail servers. It can slow down the delivery of mail because your servers are backed up distributing

hundreds or thousands of messages unrelated to work.

Statistics about spam vary from 70 to 90 percent of all e-mail. E-mail packages now let the user

identify which e-mail is spam or junk. With a feature like this, once a source of junk mail is identified,

any future mail from the same source is immediately deleted. There are also a variety of anti-spam

solutions that are implemented at the e-mail gateway so that spam never reaches your users’ mailboxes.

But even these anti-spam solutions, which are designed to help you mange e-mail, require their own

management. Because they aren’t foolproof, there may be some issues of false positives (legitimate

e-mail identified incorrectly as spam) and false negatives (junk mail identified incorrectly as a legit-

imate message). These issues can lead to more calls to the Help Desk, and your staff tracking down

misdirected e-mails. You may also need to maintain white and black lists for your anti-spam solution.

White lists identify senders whose mail should always be treated as legitimate, whereas black lists iden-

tify senders whose mail should always be treated as spam. These lists override the determination that

the anti-spam solution would make based on its own algorithms.

Harassment Although e-mails with jokes and spiritual messages may seem innocent, they can easily cross the line

and some may be seen as offensive or harassment. Your organization should have a clear-cut policy

(from senior management, not from IT) that indicates a zero tolerance for any material (including

e-mail) that can be construed as offensive on grounds of sexual harassment, racial discrimination,

and so on. It isn’t uncommon for e-mail messages to be included as evidence in various types of

litigation. One of “investor” Bernard Madoff’s alleged co-investors was indicted using some of his

firm’s e-mails (online.wsj.com/article/SB123903070566093099.html). Work with your Legal and

HR departments to define, if you haven’t done so already, a clear e-mail policy.

Viruses Although you should certainly educate your users about messages from unknown sources, a more

aggressive posture is also called for. All your workstations and servers should run anti-virus software.

In addition, you should have anti-virus software on your e-mail servers that scans messages and their

attachments for viruses. Products from Trend Micro, Symantec, McAfee, among others, are relatively

inexpensive for the protection they provide. Anti-spam and anti-virus solutions for e-mail are also

available in the cloud as an SaaS offering (e.g., Google’s Postini and Cisco’s IronPort). See

Chapter 8, Security and Compliance, on page 205 for more information regarding viruses and how to defend against them.

Data Size and Retention Because e-mail is so often used to distribute big files, such as large presentations and videos, as well

as games and jokes, the amount of storage required to keep it all can be massive. As such, it isn’t

unusual to have a corporate policy that sets limits on the size of messages, the size of mailboxes, and

the age of messages. These limitations are available with the most popular e-mail packages. It’s im-

portant that users be made aware of these policies, and that the limits are set after considering users’

needs.

Users should also be aware that size limits may be in effect regarding external users with whom they

exchange mail. Be clear to your users that just because your company’s e-mail size limit is large, that

154 CHAPTER 5 Software, Operating Systems, and Enterprise Applications

doesn’t mean other companies have the same limit. As such, if you allow your users to sendmessages of

a certain size, there is no guarantee that the message will get through since the recipient’s mail envi-

ronment could very well have a lower limit.

Appropriate Use Just like with the use of the company phones, it’s reasonable to expect that not every message your

users send will be work-related. There will be an occasional personal message. Most organizations ex-

pect and tolerate this as long as they aren’t oversized and don’t contain offensive e-mails. However, it’s

wise to have a formal policy (just like the one that probably exists for use of the company phones)

saying that e-mail is for work-related use only. Some organizations will explicitly state that some per-

sonal use of e-mail is okay, as long as it’s limited, inoffensive, and so on. Similarly, most companies

state that the e-mail environment, and its content, are owned by the company, and reserve the right to

review e-mail messages that their employees send and receive. The company usually will only invoke

that right, though, when a problem or policy violation is suspected.

Along these lines, many organizations automatically add disclaimers to any e-mail messages that

are sent outside the company. These disclaimers often assert the confidentiality of the message. But,

many industries (e.g., financial, legal) may add statements pertinent to their field.

E-mail Archiving With regulatory requirements like Sarbanes-Oxley, HIPAA, along with discovery of electronic docu-

ments in litigation, finding and accessing specific e-mail messages is becoming a growing requirement.

It’s becoming increasingly common for the Legal department to contact IT and make a request such as

“we need to find all the e-mails that anyone in the Comptroller’s group sent or received during 2011

about the merger plans.”

Although that seems like a simple request to the Legal department, it’s a monumental amount of

work for IT. First, they’ll need a list of everyone in that department (don’t forget people that might have

left during the year). The users’ online mailboxes are of no use since they no longer contain the items

that were deleted. So, the backup tapes have to be recalled, individually restored, and then searched.

And, to do the search, someone in Legal is going to have to come up with a list of keywords that might

indicate a message about merger plans.

Archiving solutions can greatly reduce the complexity of requests like the one used in this example.

These solutions keep copies of all e-mails sent and received (based on rules you define), and they can

easily be searched en masse. While the previous example could easily take week or months to fulfill

with the restoration and search of backup tapes, the same request could be done within a few days using

an archiving solution.

In addition to a sophisticated indexing and searching mechanism, archiving solutions rely on “sin-

gle instance” storage to reduce the amount of storage required. For example, if HR sent an e-mail to all

1,000 employees, the archiving solution would recognize this and store only a single copy of it (and the

same is true of attachments) in the archive.

Unified Messaging Unified messaging is the term applied to integrating your voice mail and e-mail systems. In short, you

can use your e-mail system to access your v-mail (messages appear in your inbox as audio files or as

text using a speech-to-text solution) and use your v-mail system to access your e-mail (a synthesized

1555.6 Enterprise applications

voice reads your e-mail messages to you). Unified messaging can also allow you to send and receive

faxes from your e-mail inbox and can greatly reduce the amount of paper associated with traditional

faxing. This technology is just beginning to gain acceptance and is still maturing.

It’s also important to note that there are several ways to approach the integration:

• Your v-mail vendor may sell a system that integrates to your e-mail environment.

• Your e-mail vendor may have an add-on to integrate with your v-mail.

• A third-party vendor may offer a product to tie the two messaging systems together.

Unified messaging can be complex and may be costly. It also increases the storage requirements

greatly, as users will have a greater amount of flexibility in saving and forwarding voice mail messages.

Even if you aren’t planning to implement unified messaging immediately, however, you may want to

consider it as an issue if you’re evaluating new e-mail systems. As voice-over-IP (VoIP) grows, both

for consumer and for corporate use, unified messaging is growing as new features, functionality, and

vendors are emerging.

Directory Services When new users join an organization, it’s common to find that they may need access to 10 or 20

applications. Sometimes, this means creating a separate account for each application—oftentimes, each

with a different ID and password for the user to deal with.

Not only does this become an administrative nightmare for IT (going to each individual application

to create the appropriate IDs) and a burden for the user (remembering the different IDs and passwords,

changing them, etc.), but it can be a security risk to ensure that all the appropriate IDs are deleted when

the user leaves the organization. The issue related to accounts and IDs is referred to as identity

management.

Moving toward a Single ID and Password The goal of directory services is to greatly reduce the administration, user burden, and security risk that

can be associated with multiple IDs.

A directory service is essentially a system application and database that is used by all other appli-

cations. By using just a single set of ID and password credentials, called single sign on (SSO), users can

sign on to the network, e-mail, and all the business applications they need to access.

Single sign on and identity management are also discussed in Chapter 8, Security and Compli- ance on page 205.

Directory Structure Directories are set up in a hierarchical or tree fashion, very similar to an organizational chart. Some of

the elements found in a directory include the following.

• Objects (directory entries). Virtually everything in a directory is an object. An object could be a person (i.e., user), a computer, or a device. A directory “container,” which can hold a collection of

objects, is also an object. Objects are often referred to as directory entries. • Organization unit. This is comparable to a folder in a file system. It simply holds other objects and

may also hold other organization units.

• Attribute. This provides some specifics about an object. For example, if the object is a user, there could be an attribute for the user’s phone number. If the object is a printer, there might be an

156 CHAPTER 5 Software, Operating Systems, and Enterprise Applications

attribute for the printer’s IP address. Some attributes may have more than one value. In the case of a

phone number attribute, it’s entirely possible that someone may have more than one phone number.

An attribute type is the kind of information (e.g., phone number), whereas the attribute value refers

to the specific content (e.g., 212-555-1212). • Object class. This defines which attributes are required/optional and allowed in an entry. For

example, the object class for a printer may indicate that the IP address attribute is allowed and re-

quired. Essentially, the object class defines the rules associated with different types of objects.

A directory entry may be assigned to more than one object class. For example, a directory entry

for a user may be assigned to object classes for an e-mail user, an employee, a T&E user, etc. Also,

each of those object classes would have attributes appropriate for its need.

5.7 ENTERPRISE RESOURCE PLANNING (ERP) ERP has a broad definition; it’s used in a variety of ways to mean the set of activities that a company

engages in to manage its resources across the entire enterprise. This can mean activities as diverse

as product planning, sales programs, materials purchasing, maintaining inventories, and performing

classically defined HR functions. Major software companies in the ERP space include SAP, Lawson,

SSA Global, and Oracle. ERP is a very hot topic in corporate circles.

Prior to ERP, companies would use different packages for various business functions: inventory, sales

and distribution, financials, HR, and so on. Different packages were used simply because no vendor had a

product offering that could cross all these various disciplines. The various packages might be purchased

or homegrown. To pass data among the various functions, a company would write numerous interface

programs (middleware) to extract data from one application’s database for use in another application.

The Value of ERP Software With the introduction of ERP, a company can essentially have a single application (or a single set of

applications provided by a single vendor) and database for all its vital business functions. The value of

this can be enormous. Because all the applications are integrated, a change in activity in one area of the

company ripples through the system to all affected departments so that they could react accordingly.

A sudden spike in sales notifies the Purchasing department to increase orders of raw materials, the

receiving department to look out for these deliveries, the manufacturing department to gear up for in-

creased production, HR that more labor will be needed to fulfill the demands of the increased sales,

and so on.

ERP solutions for the supply chain (manufacturing, purchasing, logistics, warehousing, inventory,

distribution, etc.) are a large portion of the market. Solutions for the supply chain often extend to in-

clude links and interfaces with suppliers and partners. ERP vendors also have different offerings for

different industries.

General ERP Implementation Issues There are several elements of ERP to keep in mind when considering implementing an ERP system.

• ERP isn’t a trivial-sized activity. True ERP systems run across the entire enterprise and, as such,

literally affect every aspect of a company’s business.

1575.7 Enterprise resource planning (ERP)

• Because the scope of an ERP implementation can be so far-reaching, it acts as a magnifying glass.

Problems are quickly seen throughout the organization. Also, problems no one knew about

suddenly become very exposed.

• Implementation of an ERP system is a gut-wrenching experience for a corporation. Some compa-

nies thrive on the new system, embrace it as the salvation of their business, and explode forward.

Others find the difficult medicine of ERP a very hard pill to swallow and eventually bail in

midstream, leaving unhappy employees, customers, and vendors screaming in their wake (to say

nothing of opening the gate to lawsuits). Trade journals are equally filled with success and failure

stories of companies that have gone through ERP implementations.

Costs of Implementing ERP In addition to the upheaval an ERP implementation can cause, the cost of implementing ERPwill easily

be in the hundreds of thousands of dollars and could go to the tens of millions for larger and more

complex environments. Usually, the biggest costs of an ERP implementation are the consultants that

you will need to assist in the implementation. Because of the complexity of installing an ERP package,

it’s common for consulting costs to total two to three times the cost of the actual software package.

Many very large consulting firms (e.g., PricewaterhouseCoopers, Deloitte, Accenture, Ernst & Young)

have entire divisions dedicated to ERP implementations.

In addition to consultants, a good portion of the budget will also go to training, support, and a large

investment in additional hardware.

Major Changes Required In many cases, the organization may find that it actually has to change the way it does business in order

to implement an ERP package. While the traditional approach of implementing a package is to tailor it

to your organization’s needs, it’s not uncommon to have to use the reverse approach when implement-

ing an ERP package.

Many core activities associated with ERP are software related, although the thrust of the implemen-

tation is often not only software. It can include changing the way departments function, organization,

procedures, employees’ roles, and a sea change in the way the company operates.

As the person responsible for a large part of the software and hardware health and well-being of the

corporation, your job, your responsibilities, and your entire skill set are going to be radically affected by

any ERP motions your company undertakes.

It Isn’t Only IT’s Decision It’s likely that you won’t be the only one consulted before your company decides to implement an ERP

system. Most likely, you will be part of a group or committee making that decision. Because imple-

menting an ERP system is almost always a multiyear adventure, you may join a company in mid-

implementation. Your decisions won’t be “Should my company do this?” as much as “How can I help

my company do this in the most efficient manner possible?”

ERP may be the single largest IT project your company has ever undertaken. Its success or failure

may lead to the success or failure of many executives and departments. Stories abound of ERP

158 CHAPTER 5 Software, Operating Systems, and Enterprise Applications

implementations that led to enormous cost overruns, 20-hour days, 7-day weeks, loss of key teammem-

bers, implementation delays, and more.

If you’re involved in an ERP implementation, chances are you will be making more use of some of

the topics in this book (project management, budgeting, etc.) than with any other project you’ll ever be

involved in.

You, as well as everyone else involved, should look at an ERP implementation as the single greatest

opportunity to reengineer the way your organization works and to have a huge beneficial impact that

will probably live on for many years.

Disadvantages to ERP ERP isn’t without its risk and detractors. There can be disadvantages and pitfalls to it.

• The very rigid structure of an ERP solution oftentimes makes it difficult to adapt to the specific

needs of individual organizations.

• Because ERP software is enormously sophisticated, there is often a tendency to implement more

features and functions for a particular installation than are actually needed. This drives up costs and

may reduce usage if the system proves too complex to use. • The cost to implement and maintain ERP systems is very high and can challenge ROI calculations. • Some departments and users may be hesitant to agree to the implementation if they feel they’re

giving up control of their data by switching from a department application to an enterprise-wide

solution.

As the name implies, an ERP implementation is a decision that needs to be supported and embraced by

the entire organization. If not, the odds of success will be severely limited.

5.8 Further References Websites aws.amazon.com (cloud service provider). online.wsj.com/article/SB123903070566093099.html (use of e-mail as evidence in financial fraud). www.lawson.com (ERP vendor). www.acronis.com/enterprise/products/snapdeploy (disk cloning tool). www.altiris.com (software deployment tool). www.apple.com/iwork (productivity tool vendor). www.bsa.org (trade organization for software publishers). www.cisco.com/web/about/ac49/ac0/ac1/ac259/ironport.html (cloud-based offering for e-mail security). www.cloudtimes.org/25-cloud-vendors-to-watch-out-for (25 leading cloud vendors). www.corel.com (productivity software vendor). www.gnu.org (“free” software site). www.google.com/postini/ (cloud-based offering for e-mail security). www.jamfsoftware.com (software deployment tool vendor). www.koffice.org (Open Source productivity software). www.landesk.com (software deployment tool vendor). www.linux.org (Linux).

1595.8 Further references

www.mcafee.com (antivirus software vendor). www.microsoft.com (software deployment, cloud, virtualization, and productivity tools). www.openoffice.org (Open Source productivity software). www.oracle.com (ERP vendor). www.rackspace.com (cloud service provider). www.radicati.com/wp/wp-content/uploads/2011/05/Email-Statistics-Report-2011-2015-Executive-Sum

mary.pdf (e-mail usage study). www.salesforce.com (cloud service provider). www.sap.com (ERP software vendor). www.siia.net (trade organization for software publishers). www.ssaglobal.com (ERP software vendor). www.symantec.com (antivirus software and deployment tool vendor). www.trendmicro.com (antivirus software vendor). www.tumbleweed.com (e-mail management vendor).

Books and Articles Babcock, C., 2010. Management Strategies for the Cloud Revolution: How Cloud Computing Is Transforming

Business and Why You Can’t Afford to Be Left Behind. McGraw-Hill.

Bradford, M., 2008. Modern ERP: Select, Implement & Use Today’s Advanced Business Systems. Lulu.com.

Brousell, L., 2011. Putting the Cloud First. CIO Magazine June 15.

Carter, J., 2008. Unified Communications 100 Success Secrets Discover the Best Way to Unify Your Enterprise,

Covers Unified Messaging, Systems, Solutions, Software and Services. Emereo Pty Ltd.

Currier, G., 2011. Speeding the Cloud. Baseline Magazine May/June.

Flynn, N., 2009. The e-Policy Handbook: Rules and Best Practices to Safely Manage Your Company’s E-Mail,

Blogs, Social Networking, and Other Electronic Communication Tools. Amacom.

Haletky, E.L., 2008. VMware ESX Server in the Enterprise: Planning and Securing Virtualization Servers.

Prentice Hall.

Hugos, M.H., Hulitzky, D., 2010. Business in the Cloud: What Every Business Needs to Know about Cloud

Computing. Wiley.

McHoes, A., Flynn, I.M., 2010. Understanding Operating Systems. Course Technology.

Meeker, H.J., 2008. The Open Source Alternative: Understanding Risks and Leveraging Opportunities. Wiley.

Mitchell, R.L., 2011. Big Business Takes a Small Bite of the Apple. Computerworld August 22.

Menken, I., 2010. Virtualization—The Complete Cornerstone Guide to Virtualization Best Practices. Emereo

Pty Ltd.

Rashid, F., 2011. Cloud Security Services Can Reduce Malware. eWeek July 18.

Rhoton, J., 2010. Cloud Computing Explained. Recursive Press.

Rustad, M., 2010. Software Licensing: Principles and Practical Strategies. Oxford University Press.

Silberschatz, A., Gagne, G., Galvin, P.B., 2011. Operating Systems Concepts. Wiley.

Sosinsky, B., 2011. Cloud Computing Bible. Wiley.

Vaman, J.N., 2008. ERP in Practice: ERP strategies for steering organizational competence and competitive

advantage. McGraw-Hill.

van der Hoeven, H., 2011. ERP and Business Processes. Llumina Press.

Winkler, V., 2011. Securing the Cloud: Computer Security Techniques and Tactics. Syngress.

Word, J., 2011. Integrated Business Processes with ERP Systems. Wiley.

Wagner, B., Monk, E., 2008. Enterprise Resource Planning. Course Technology.

160 CHAPTER 5 Software, Operating Systems, and Enterprise Applications

CHAPTER

Managing the Money 6 Budget: A mathematical confirmation of your suspicions.

A.A. Latimer

CHAPTER TABLE OF CONTENTS

6.1 The Budgeting Process ..................................................................................................................161

6.2 The Difference between Capital Expenditures and Operating Expense Items ......................................167

6.3 Lease versus Buy: Which One Is Better? .........................................................................................168

6.4 Other Budgeting Factors to Consider ...............................................................................................170

6.5 Managing Vendors ........................................................................................................................173

6.6 Managing the Money during Difficult Times ....................................................................................179

6.7 Outsourcing and Offshoring ............................................................................................................182

6.8 Further References ........................................................................................................................187

As a manager, one of the things you have to manage is money and how your department spends it. Also,

because IT departments often have one of the largest budgets in the organization, many eyes will be on

your budget. This chapter will help you minimize, and deal with, the raised eyebrows over all those

eyes. In the pages that follow, we discuss the issues behind a variety of topics, such as how and when

a budget is generated, capital versus operating expenses, leasing versus buying, key factors you need to

watch out for when developing your department’s budget, managing the relationships with your ven-

dors, outsourcing, and managing the money in difficult economic times.

6.1 THE BUDGETING PROCESS The budgeting process assigns specific amounts of money to specific departments within a company

for a single period of time called a “fiscal year.” Sometimes a company’s fiscal year is not the January–

December calendar year. The year that the budget tracks can be any 12-month period, although it

generally begins on January 1, April 1, July 1, or October 1 (the beginning of a quarter).

Regardless, the 12-month period for your budget is called the “fiscal year.” If the fiscal year isn’t the

same as the calendar year, you identify the fiscal years by the year in which it ends. For example, if your

fiscal years go from July 1 to June 30, you would refer to the budget that covers July 1, 2013, through

June 30, 2014, as the 2014 budget, or sometimes as “fiscal 2014.”

In general, the budgeting process begins two to three months before the start of the fiscal year. At

this point, you begin to develop your first draft of the budget, estimating the amount of money you plan

IT Manager’s Handbook.

© 2012 William Holtsnider & Brian D. Jaffe. Published by Elsevier, Inc. All rights reserved. 161

to spend during the upcoming 12 months. You prepare this budget based on the past year’s spending as

well as factoring in future plans and expectations such as growth, consolidation, new initiatives and

projects, etc.

In your planning, you should have discussions with other department managers to learn about their

upcoming needs and projects that might impact your department’s spending. Depending on your

company and the business that it is in, you may also want to include discussions with key partners,

clients, suppliers, and customers. Similarly, it would be wise to take a look at your company’s chief

competitors to try to learn about their use and plans for IT to help gauge your own plans.

If you are new to management, you will quickly discover that the budget process and all its

associated processes are critical to you and your department’s success. Regardless of how important

your role in the company is deemed to be, unless that importance is backed up with financial support

specified in the budget process, you will find getting anything done to be a very difficult task.

Possible Budget Items The first place to get started with a budget is to review the previous years’ budgets for your department.

Budgets are historical records and are (in most cases) carefully tracked—somebody in your company is

always watching the money.

Every company keeps track of budgets and spending a bit differently and may use different names,

categories, and groupings from the ones given here. Find out how your company budgets and then

customize the concepts and techniques described here to meet your needs.

Which Items to Track The following is a list of potential items for your department’s budget. Check each item to see if you are

tracking it in your department and if not, why not.

Personnel • Staff compensation (salaries, overtime, bonuses, etc.)

• Benefits

• Recruiting (agencies, ads, etc.) • Bonuses/overtime • Education/training • Consultants/temporary help

Hardware • Upgrades

• Maintenance and support

• New equipment • Leases/rentals • Replacement components

Software • New software (applications, operating system, utilities, etc.)

• Vendor maintenance and support

162 CHAPTER 6 Managing the Money

• Upgrades

• License renewals

Telecommunication Services • Service fees for handheld devices, cell phones, and tablets • Telco lines (point-to-point, MPLS, voice-trunks, ISDN, etc.) • ISP connections and services

Supplies • Printer consumables (paper, toner)

• Backup tapes

• Miscellaneous hardware items (keyboards, mice, flash-drives, cables, etc.) • Basic office supplies

Travel and Entertainment • Conferences

• Off-site travel to branch offices and new sites

• Lunches and dinners for staff working late or through the weekend

Miscellaneous • Books and subscriptions • Membership dues for professional organizations • Postage • Duplication

Depreciation • Hardware

• Software

Physical Plant • Data center services (cabinets, raised-floor, HVAC, electrical) • Cabling (fiber and copper) • Furniture

Outside Services • Disaster recovery

• Off-site tape storage

• Service bureaus • Consultants • Service providers (Web hosting, application providers, services in the cloud, etc.)

Overhead • Rent

• Utilities

1636.1 The budgeting process

Chargebacks—Who Really Pays? In some companies, the budget for IT is used for all technology costs. In other cases, each department

must budget for the technology it buys, such as computers and printers, as well as for specific projects

and applications. Sometimes IT’s budget for items used across all departments (IT staff, servers,

Internet connections) is prorated and charged back to each department. These are commonly called

“chargebacks.”

The benefit of charging expenses back to individual departments is that those departments become

more cost conscious of their IT uses and requirements. They better understand the costs of making

everyone’s e-mail accessible on their cell phones, for example, if they have to pay for that functionality.

The downside is that it can create a tremendous amount of administrative overhead to calculate the

chargebacks and process them. It can also create additional headaches for you if department heads think

the chargebacks are too high. “I saw an ad in the paper for a $500 PC, but the ones we’re buying are

$800—my team doesn’t need a brand name or fancy configurations, so we’ll take the $500 one,” for

example. It can also create IT challenges if some department heads are very cost conscious about their

spending on IT, while other department heads are less concerned. Situations like this mean that there

can be distinct technology differences/capabilities from one department to another.

Although chargebacks don’t alter the budgeting process dramatically, they may have an impact on

how you approach it.

Reviewers for Your Budget Most likely you’ll be reviewing the first drafts of your budget with your director or vice president. In

general, it’s a good idea to get as many eyes and minds involved with your budget as possible. You

don’t want to overlook anything. This includes getting your direct reports involved in the process.

Solicit from them ideas about projects they know about, things they’d like to get done, hardware

and software that needs to be replaced or upgraded, and so on.

In all likelihood, involving your staff in the budget process will benefit both of you—not only will

they appreciate the opportunity to be involved, they will most likely offer up some items that you

had neglected to think about. At the same time you’re collecting the expected dollar amounts for your

budget, you want to make sure you’re collecting the associated explanations and justifications. You

will have to refer to this information when it comes time to explain, justify, and defend your budget.

See the section later in this chapter entitled “Getting Approval and Defending Your Budget” on page 165.

Try to keep as much detailed information as possible, not just high-level summaries. For example,

instead of putting $500K in software maintenance, identify the various applications that you pay

maintenance for, how much the maintenance is, and when the maintenance comes up for renewal.

Having this information readily available makes it that much easier if you are asked to explain your

budget. Also, it helps identify those items that should be removed from the budget because they are no

longer in use.

You need to thoroughly understand and know your material before making a formal presentation.

You should be fully versed in how you came up with your numbers, what assumptions were used, and

so on. Many managers, IT and non-IT alike, don’t do their homework before making a formal budget

presentation. This lack of preparation clearly shows during the meetings. The more knowledgeable you

are, the more confidence they’ll have in what you say.

164 CHAPTER 6 Managing the Money

In general, the budget may be approved by your CFO or executive committee around the start of the

fiscal year. However, it’s not unheard of for the final approval to be delayed until a month or two into

the new fiscal year.

Estimating (and Overestimating) Your Numbers It’s general practice to overestimate your budget to a certain degree. While this style sounds questionable

from a practical and ethical perspective, it’s so widely practiced and accepted that you need to address the

issue directly when you present your budget. Most experienced managers expect an overestimation.

It’s important to understand that the practice of overestimating is very common and well understood

by both sides. If you consciously do not overestimate (and many managers don’t), make a point of bringing this up during budget discussions with your supervisors.

There are several reasons for overestimating:

• It gives you room to cut if upper management asks to reduce spending.

• It gives you room for those unanticipated expenses that invariably crop up.

• It increases the likelihood that you’ll be within budget for the year, which could be a critical factor

in determining your bonus or merit increase.

Of course, the downside of overestimating your budget is that if you don’t use all the money allocated to

your department, you may not get approval for such a large budget in future years. A large surplus may

also give the impressions that you don’t do a good job of planning. Very often, the end of the budget

year has department managers either shifting some of next year’s purchases into this year’s budget

(trying to use up unspent funds) or shifting some of this year’s purchases into next year’s budget (trying

to avoid going over their budget).

Getting Approval and Defending Your Budget As you work to develop your budget, it is likely that you’ll have to present it or defend it in some

manner. While there may be great temptation to review each item line by line, this isn’t a common

practice. Summaries are generally the expected norm for discussions with management and the finance

department, but have the details ready in case you need them.

You’ll probably have to give a high-level overview of your budget to your superiors—using more

words than numbers. Youmay end up presenting this to your manager, to Accounting, or to some sort of

company budgeting committee. You’ll be better off couching these explanations in business terms, as

opposed to IT terms. Don’t try to explain why three programmers are needed for the Web analytics

project. Instead, explain the value of delivering the project to the company in time for the holiday

shopping period, and that the cost of the programmers is the means to that end.

Also, be prepared to explain how budget reductions will impact various goals and projects. For

example, a time frame for a project may need to be extended or functionality will be sacrificed.

(See the section “Three Critical Components to Any Project” in Chapter 4, Project Management on page 111 about “ . . . the interplay of the three characteristics of a project—time, money, resources . . . .”)

It may be appropriate to make references to last year’s budget and projects as a comparison. You

should also be prepared to explain large variances from year to year. For example, if you’re queried as

1656.1 The budgeting process

to why you’re expecting a 25 percent increase in supplies, you can explain that the new document

imaging system will greatly increase the amount of data that is stored online and has to be backed

up so you’ll need to buy more tapes. When presenting your budget, not only are you providing infor-

mation and letting your audience see what they’re getting for their money, you’re also trying to make

them feel confident in your abilities.

Remember to keep in mind that you are probably presenting to an audience who has little under-

standing of the technical details behind your job and your budget. They don’t know the difference

between a megabit and a megabyte—and they don’t want to know. That is your job. In your budget presentation, act as you always do when presenting to a nontechnical audience: recognize they are ex-

perts in their own field who deserve respect from a fellow professional. You don’t like being demeaned

because you don’t know what an “indemnification clause” is when Legal mentions it, so don’t demean

non-ITers because they ask what a KVM switch is.

Don’t be surprised if your budget goes through several iterations. The powers that be may kick it

back and ask for reductions or more explanation. You may be asked to eliminate certain projects so that

those costs can be recovered or you may simply be asked to reduce it by a fixed amount or percentage.

If so, be sure that you explain the consequences of those reductions.

During the Year: Tracking and Revising Your Budget During the year, your Accounting department will probably furnish monthly or quarterly reports of

your department’s year-to-date spending. Look closely at these reports. It’s not uncommon for data

entry errors to occur where another department’s purchase is charged to your cost center or for one

of your own purchases to be charged to the wrong category.

The report you get from Accounting will probably have several columns for each category:

• Budgeted amount • Actual amount spent for the month • Actual amount spent year to date

• Variance against budget (an over/under amount indicating how well you are doing compared to the

expected amount based on your original budget)

• Variance against last year (an over/under amount indicating if you are spending more or less for the

same items as last year)

Your Accounting department may be able to give you reports with different formats based on your

needs. Detailed reports can usually be requested if you have questions about information in summary

reports. But don’t get too caught up watching pennies. As a general rule, your primary concern is the

total budget for your department. If your overall spend is well under budget, no one is likely to care if

you overspent within the supplies category, for example.

Revising Your Budget During the year, you may have one or two opportunities to revise your budget. These revisions are often

referred to as forecasts, reforecasts, revised estimates, or updates. These revisions can be used to:

• Include projects that weren’t expected during the initial budgeting process.

• Eliminate or reduce costs for projects that were canceled or scaled down since the initial budget was

proposed.

166 CHAPTER 6 Managing the Money

• Update/refine projections based on actual spending and other changes (e.g., vendor pricing,

expansion, size of projects).

• Demonstrate anticipated cost reduction as a result of belt tightening.

Each opportunity to revise the budget is a chance to deliver a more accurate estimate. Your initial

budget is essentially a 12-month projection. However, a midyear revision is 6 months of actual costs

and only 6 months of projection.

6.2 THE DIFFERENCE BETWEEN CAPITAL EXPENDITURES AND OPERATING EXPENSE ITEMS A budget usually consists of two sets of numbers: one for capital expenditures and one for operating

expenses. Typically, these are considered separately, with different amounts of scrutiny. IT is a bit of an

odd duck department in the budgeting process in that it usually has a significant capital budget. After

all, most of the traditional corporate departments (Marketing, Finance, HR, etc.) usually don’t have

much need for acquiring assets.

• Whenever you spend money on something, you’ll have to consider if an item is a capitalized or

operating expense so that it can be treated accordingly in the accounting process. A capital expen-

diture is for an item that will have a useful life of several years, such as a piece of hardware. Ex-

amples of capital expenses would include most hardware, software, Enterprise Resource Planning

(ERP) solutions, furniture, physical plant items (e.g., cabling, data center cabinets), and so on.

• Alternatively, an operating expense item is something whose value is gone in a shorter period of

time. Operating expenses are the cost of resources used to support the ongoing operations of a busi-

ness. They often recur, in that they have to be paid each month or quarter (e.g., the electric bill or

salaries). Operating expenses are for items that last for a short time and have no residual value after

that period. Examples of operating expenses would include salaries, telecom lines, software and

hardware maintenance agreements, equipment rentals, etc. A software support agreement, for ex-

ample, is an operating expense item. The value of the money spent each year lasts only for the

12 months of the agreement.

Capital Expenditure Details If the useful life of a $10,000 router is expected to be five years, accounting principles of capital

depreciation allow you to spread the cost over the life of the equipment—in this case five years.

So, even though the companymay have to write a check for the full amount when it buys the equipment,

the impact of this purchase on the company’s books, and your department’s budget, may only be $2,000

that first year and in each of the subsequent four years of the device’s expected life.

Because there is more paperwork involved in tracking a capitalized expense for each year of its

useful life, there is generally a minimum dollar amount for capitalizing items. For example, a computer

cable might be useful for 10 years, but because it only costs $25, it would not be capitalized. The min-

imum amount for capitalizing varies from company to company. Figures of $500, $1,000, or $1,500 are

common—check with your Accounting department.

Although the useful life of a connection to the Internet might seem to be quite long, in reality its

useful life is only as long as your last payment to the carrier. Stop paying the carrier and its life drops to

1676.2 The difference between capital expenditures and operating expense items

zero. Since you’re really just renting it from the carrier, it can’t be considered an asset on the books of

your organization.

Check with Your Company’s Policies You’ll do yourself a big favor by checking with your Accounting and Finance departments to get an

understanding of your company’s policies regarding capital expenditures, depreciation schedules, and

so on. Armed with this, it’s within your best interest to group projects’ costs into three categories: cap-

ital expenditures, expense items, and any recurring costs that will continue after the project is com-

pleted (e.g., maintenance contracts, telecommunication costs, etc.).

Gray Areas There are several gray areas regarding capital and expense items. Typically, assets are tangible items.

However, software and applications aren’t things you can touch. There used to be a lot of variance in

the treatment of software costs, but now it is generally capitalized—but not always. Some organizations

will capitalize a vendor’s consulting services if they’re bundled with the sale of hardware. Similarly, there

may be justification to capitalizing the staff salaries, or training, associated with a particular project.

Interpreting accounting regulations can be as difficult as interpreting any other legalese. It’s always

best to check with the experts. For accounting issues, the experts are your Accounting department.

Another issue related to the consideration of capital versus operating expense is your company’s

sensitivity to each. Some companies are particularly sensitive to capital expenditures, whereas others

are more sensitive to operating costs. You probably won’t find any official statement or policy about

this, but you’re likely to get a sense of it fairly quickly.

For items that are capitalized, you will see the cost for each year of the item’s useful life charged to

your budget (usually in a category called “depreciation”). The Accounting department has software

called a “fixed assets application” to track the cost and depreciation of capitalized items.

The example given earlier said that a $25 cable wouldn’t be capitalized because the cost was too

low, even though it had a long useful life. If you place an order for 1000 cables, you still wouldn’t

capitalize the cables (even though the order totaled $25,000) because individually they cost so little. However, some companies still choose to look at the total order so that it can be capitalized.

6.3 LEASE VERSUS BUY: WHICH ONE IS BETTER? One of the discussions you’re likely to have about acquiring hardware is “lease versus buy.” Leasing

computer equipment carries with it essentially the same pros and cons as leasing a car (see Table 6.1).

When you lease something, you’re essentially renting it for a specified period of time. In general,

you make arrangements to purchase a piece of hardware, but the leasing company makes the actual

purchase. The leasing company is then the owner and they lease it to you. Over the period of the lease,

the total lease payments will be higher than the purchase cost. This difference is a result of the rate

charged by the leasing company (essentially interest).

During the term of the lease, which is generally several years, you’re responsible for the hardware,

its maintenance, upkeep, and so on—just as if you owned it. You will make monthly or quarterly lease

payments. It’s important to note that lease payments are generally treated as an expense item, not as a

168 CHAPTER 6 Managing the Money

capital asset. The reason is simple: you don’t own the leased equipment. However, it is also possibly for

a lease to be treated as capital—see the sidebar on page 169 about Operating versus Capital leases. At the end of the lease, you usually have several choices:

• Terminate the lease by sending the equipment back to the leasing company.

• Extend the lease (although you should be careful that the new lease payments are based on the unit’s

current market value, not the original purchase price).

• Buy the equipment. Often you can do this for a very low cost ($1.00) or for its current market value.

Keep in mind that you generally have to inform the leasing company of your plans 90 days prior to the

end of the lease.

OPERATING VERSUS CAPITAL LEASE

Some leases are essentially rentals, whereas others are really purchases that happen over a long term. For example, if you rent office space for a year, the space is worth nearly as much at the end of the year as when you started; you’re simply using it for a period of time. This is an operating lease. If you lease a server for five years, at the end of the lease the computer is worth a lot less than it was when the lease started. The leasing company doesn’t want the unit back at the end of the lease because it’s highly unlikely to find a customer that will be interested in a five-year-old piece of computer equipment. The company you leased it from has to account for this and charges you a payment that will recover all of the lease’s costs, along with their margin for profit. At the end of the lease, ownership of the unit trans- fers to you. This type of lease is referred to as a capital lease and is really a purchase with a built-in loan. According to Financial Accounting Standards Board (FASB) Statement 13, a lease is considered a capital lease if it meets any one of the following criteria:

• The lease transfers ownership of the property to the lessee by the end of the lease term. • The lease contains an option to purchase the leased property at a bargain price. • The lease term is equal to or greater than 75 percent of the estimated life of the leased property (e.g., the lease

term is six years and the estimated life is eight years). • The present value of rental and other minimum lease payments equals or exceeds 90 percent of the fair value of

the leased property less any investment tax credit retained by the lessor.

Leasing Should you lease an item or buy it? As Table 6.1 shows, there are pros and cons to each choice.

Table 6.1 Pros and Cons of Leasing

PRO CON

Predictable payments for the life of the lease could ease budget projection and administration.

Extra effort during purchasing to coordinate activities between the leasing company and the equipment vendor. During the life of the lease there is ongoing administrative work to process the invoices and payments.

Continued

1696.3 Lease versus buy: Which one is better?

Who Makes This Decision? Lease versus buy isn’t a decision that IT should make alone. In fact, it’s a decision usually made by the

financial departments with input from IT. Very often, the decision will be based on whether the com-

pany can better accommodate the costs as a capital expense or an operational expense.

6.4 OTHER BUDGETING FACTORS TO CONSIDER There are a number of key factors that you should consider when budgeting:

• Growth of your department’s workload

• Technological change

• Staff • Software maintenance • Hardware maintenance

Growth of Your Department’s Workload In general, the IT workload grows each year. Even if the company’s growth is flat and the general cost

of technology continues to decline, in most companies, the need for IT resources continues to grow

exponentially. This growth includes items such as faster line speeds, more powerful corporate smart

phones and other mobile equipment, additional applications, more server horsepower, greater redun-

dancies, and more disk space. (Even with the recent trend of companies “outsourcing” IT work to data

centers, IT departments within corporations continue to grow. As you know, someone has to make all this stuff work together.)

It’shard todetermineanexact figure for eachyear’sgrowth.Often it’snomore thanabestguess.Before

making your guess, however, you should examine how the IT workload has grown in the past and learn

about upcoming activities and projects that the company has planned thatmight impact the demand on IT.

Table 6.1 Pros and Cons of Leasing—Cont’d

PRO CON

Allows companies with limited cash flows, or lines of credit, to obtain expensive equipment.

Complications arise if equipment is upgraded during the life of the lease: Should the upgrade be leased or purchased? If leased, it needs to be co-terminus with the original lease. If purchased, you have to remember not to send the upgrade back to the leasing company at the lease’s end. Also, some leases have provisions in them that stipulate that any upgrade will invalidate the lease.

Allows for predictable and planned turnover of equipment that’s replaced regularly (e.g., PCs, servers, printers).

If you’re leasing a high volume of equipment (such as PCs in a large environment), there is additional effort to track inventory precisely so that equipment can be located at the end of the lease to be returned.

Many businesses have discovered they don’t need to own the equipment they use.

The packing and shipping of equipment returned at the end of a lease could be burdensome.

Depreciation and interest on debt may produce potential tax/financial benefits.

If you charge equipment to the department where it’s used, it could require extra effort to code each lease invoice properly.

170 CHAPTER 6 Managing the Money

Technological Change Technology changes fast. This is a fact of life in the computer world that makes this industry so fas-

cinating and frustrating at the same time. When you buy a new piece of equipment (e.g., a server), it’s

safe to say that you’ll need to upgrade it over time to get more out of it as growth demands. You’ll need

to add memory, disk space, and perhaps additional processors. Eventually, there will come a time when

it really doesn’t pay to invest more money into this device, either because the technology has changed

(e.g., new generations of processors) or because the cost of new equipment is relatively inexpensive.

Regardless of the specific reason, you need to anticipate this fact. While technology does change

quickly, you need to be able to forecast the need to upgrade it and its eventual obsolescence and re-

placement. As equipment gets replaced, you’re likely to be questioned for the need of the replacement.

Be prepared to explain to users who have little understanding of technology why you’re buying a new

piece of equipment to do the same job as the piece of equipment you bought three years ago.

Staff Growth of staff salaries (annual merit increases, promotions, bonuses, etc.) should be routinely factored

into each year’s budget. A more significant budget factor is staff turnover.

The turnover rates of IT personnel vary tremendously. Those individuals that enjoy always working

with the latest and greatest technologies may not last more than a year or two before they’re off to

greener pastures. PC technicians may also last a short time as they seek to find opportunities beyond

the Help Desk. Your company, salary, and benefits, each employee’s goals and objectives, and their

overall happiness with the company—and with you as their manager—are all factors that will influence

your staff members’ decisions to stay with the company.

Even though your staff may seem quite content, you should assume that there will be some turnover.

You may not be able to predict who and when, but you can probably estimate the number of people that

will leave. As you try to best guess the turnover, you need to estimate what it will cost to recruit their

replacements: headhunters, Web postings, and so on. And when you’re thinking that some employees

may actually leave, you might want to also throw some money into your consulting budget to provide

for interim staffing while you recruit new employees. Finally, the new staff may need some training to

bring them up to speed on some of the technology solutions you’re using. As a manager it’s always best

to remember that it is generally less expensive to train staff than to recruit them.

Software Maintenance No one knows everything there is to know about technology, and that’s why vendors offer maintenance

agreements. This can be a significant factor for software—annual fees of 20 percent of the purchase

price are fairly common. Some packages are so critical to your environment that you can’t even con-

sider forgoing support. Other packages may not be as important.

Keep in mind that sometimes software vendors differentiate between maintenance and support. Maintenance may be limited to your ability to get upgrades for the product. Support, however, gener-

ally refers to your ability to get assistance (phone, Web-based, etc.) when you have a problem or

question regarding use of the software. Make sure you understand what your vendor means by main-

tenance and support. Also, for some vendors, maintenance only covers interim releases and patches,

while major upgrades have to be paid for separately.

1716.4 Other budgeting factors to consider

Hardware Maintenance Like software, some critical hardware (e.g., a production server) may have very high levels of formal

maintenance arrangements, whereas other devices (e.g., a printer) may go without formal support for a

variety of reasons (it may be just as easy, or inexpensive enough, to simply keep a spare around). You

may choose a hybrid solution by having formal service arrangements for your more vital devices and

using less expensive coverage (or no coverage) for less critical components.

While software support and maintenance are often only provided by the original manufacturer,

there are numerous sources for hardware maintenance. Factors to consider when looking at mainte-

nance agreements for hardware include:

• Days and hours of coverage required (9–5, Monday–Friday; 24/7/365; etc.)

• Response time guarantees (keep in mind that frequently the response time refers to how long before

the vendor calls you back, not how long it takes for a technician to arrive on site and certainly not

how long it takes to repair the device)

• Plans for spare parts (some vendors you contract with may offer to keep a locked cabinet of parts in

your computer room so that they are always available to them) • Whether the vendor and/or its technicians are certified • Pricing: standard versus premium for extended coverage, or escalated response times • Consequences or remedies if the vendor fails to meet promised service levels

Time-and-Material (T&M) Contracts Alternatives to maintenance contracts are Time-and-Material (T&M) arrangements. With these ar-

rangements, when you place a service call for a piece of hardware, the vendor will bill you for the

technician’s time and the parts that are needed—similar to a repair on your car after the warranty ex-

pires. Because of the high degree of reliability of today’s technology, it’s entirely possible you’ll save

money by forgoing hardware maintenance contracts and rolling the dice on T&M.

Risks with T&M There are two risks associated with T&M:

• The repairs could be costly and it’s likely that the cost of a single site visit for a repair will be more

than the cost of an annual contract. • Vendors usually give greater priority to calls placed by customers with service contracts than to

calls for T&M service.

If you go with T&M, make sure you set up the account with the vendors you’ll use. By establishing a

relationship in advance (knowing your customer number and site number and having the right phone

number to call), you will expedite the process when you need to make a call.

Vendors’ T&M Policies Tomake sure you fully understand what you’re entering into with a T&Mpolicy, be certain to ask about

the vendor’s policies regarding:

• Hourly rates, overtime

• Minimum time charges

• Charges for travel

• Credit for defective parts that are swapped out

• Availability of parts

172 CHAPTER 6 Managing the Money

Warranties The last choice for hardware support is the warranty that comes with new equipment. Warranties of

up to three years are common. However, sometimes the warranty requires that you send the unit

back to the manufacturer or bring it to an authorized repair center (although some equipment does

come with an on-site warranty). But it’s important to realize that most on-site warranties generally

provide for a “best effort” for a next business-day response. Generally, vendors and/or their resellers

offer upgrades for new equipment warranties to provide for higher levels of coverage.

When you’re thinking about skipping a maintenance contract on a piece of hardware because the

price seems too high, be sure to think about the cost to your environment and its impact on customers,

users, clients, and business partners if that unit should go down. Consider a situation where a piece of

equipment fails after business hours on a Friday. Your call may not even be handled until the following

Monday, and a next business-day response would get you a technician on Tuesday. She may diagnose a

faulty part, and its replacement has to be sent overnight from the warehouse for delivery onWednesday.

In this case, you’ve been down for five days. Throw a fewwrinkles into the situation—a technician who

doesn’t show, a misdiagnosis, out-of-stock parts, a holiday, delayed deliveries—and your downtime

could easily be a week.

6.5 MANAGING VENDORS Purchasing IT equipment has become more complicated as time has passed. The reasons for this com-

plexity are because the players have changed, the metrics have changed, the information changes

quickly (new versions no longer come out only once a year), and the sources for purchasing items have

changed (nobody sends you catalogs in the mail anymore).

As an ITManager, you will be buying a lot of hardware and software. You have a complex matrix of

responsibilities that includes saving money for your company, getting the right resources to make the

projects work, giving your employees the right tools, and meeting a series of overlapping deadlines that

occasionally seem hopeless.

Establish a Relationship Relationships between IT buyers and their vendors have now reached the level of maturity that buyers

from other well-established industries—clothing, merchandise, food, and so on—have enjoyed and

suffered from for a long time. Gone are the days of get-me-the-latest-as-fast-as-you can. Very few com-

panies automatically upgrade to every new version of every product they use. Companies now make a

determination whether an upgrade is worth the expense and effort and may choose to skip a version and

wait for the next.

As a consequence, IT buyers get to enjoy, and suffer from, all the aspects of a more well-defined

experience with their vendors. Companies don’t buy as quickly or as blindly, nor do vendors come out

with major upgrades quite as frequently. New versions are released, but the real functionality change

often isn’t as great as it once was (security and antivirus patches are notable exceptions).

Add to the mix the fact that the amount of money involved is exponentially higher than it ever

was (and budgets on both sides of the table are tighter than they ever were), and you have

the elements of a combustible experience. Your job is to make sure that if anyone gets burned,

it isn’t you.

1736.5 Managing vendors

Another complicating factor is the move to “computing in the cloud.” Well-accepted definitions of

this term are still evolving, but it essentially means that your applications and data exist on the Web

with a service provider. You buy (or rent) and run software over the Web. When new software is

released, you do not get CDs, you get a link. The service provider takes care of everything related

to the servers and also deals with the backups, application upgrades, redundancies, etc. Managing

the costs and vendor relationships in such a virtual world is a new challenge. For a fuller discussion,

see the section “Cloud Computing” on page 148 in Chapter 5, Software, Operating Systems, and Enterprise Applications.

Help Your Vendors There is a second principle at work here: Put yourself in the vendor’s shoes. In any conversation, trying

to imagine what the other person is thinking can help your thinking. In buying situations, try to imagine

what the vendor is thinking. Sometimes it can be obvious; he is trying to nickel-and-dime you and that’s

all there is to it. But sometimes you can guess his next move; if he drops his initial asking price, for

example, he may have chopped a year or two off the length of the service contract.

Along those lines, make sure your vendors get paid. Track big invoices through your Accounting

department so that you know your vendors are happy. Someday you’ll need to ask them a favor, such as

needing immediate delivery on an item that usually has a long lead time.

Remember that a vendor/client relationship is a two-way street. It may appear to be one-way, but it

is in fact two-way. There will be times when you will be able to make or break a vendor’s monthly

quota, but there will also be times when you will need a server delivered over the weekend or a trial

of the latest hard-to-find tablet device. In both situations, it helps both parties to view the relationship as

one that can help each other rather than an adversarial one where only one wins at the expense of the

other. Think of your primary vendors as strategic partners.

Request for Proposals In many cases you know exactly what you want and you just want to order it, which is more often the

case with purchasing specific hardware and software. In other cases, there may be special requirements.

These can include things like installation, setup, configuring, and custom coding, etc. Or, you may have

special needs, such as the work can be performed only after hours.

In these cases you would prepare a Request for Proposal (RFP) or Request for Quotation (RFQ).

An RFP is essentially a document detailing your requirements and asking specific questions. RFPs

can be a single page in length or run up to 50 pages or more. They vary depending on the scope of the

project and the number of concerns you have. They are an excellent way of ensuring that both you and

your vendor(s) are on the exact same page as to what is expected, what’s provided, what the costs are,

and so on.

Similar to an RFP is a Request for Information (RFI). An RFI is generally used to gather preliminary

information about a vendor in order to see if they meet some basic requirements. The RFI helps narrow

down the list of vendors that would get the RFP. For example, youmay want to use an RFI to ensure that

the vendor has a minimum amount of experience in a certain area, has a global presence, or has the sort

of products and services you are looking for. Of course, you can ask RFI-type questions in an RFP, but

there’s no point in making a vendor fill out a lengthy RFP only to find out that they don’t meet your

minimal requirements.

174 CHAPTER 6 Managing the Money

Get Multiple Bids If the product you’re evaluating has competitors, you should always get multiple bids. Even if you

know the exact make and model of the product you want, you should still get multiple bids from dif-

ferent resellers. Some organizations—government agencies, for example—are required to get multiple bids. In most cases there may not be a legal requirement, but it certainly makes sense in many cases to

get more than one bid, especially for larger purchases. When you get multiple bids you’re keeping

everyone on their toes and showing others that you’re conscious of costs.

Be warned if a vendor reacts negatively when you talk about getting multiple bids. It’s a common

sales technique to try and get the customer not to look at other options; any vendor worth their salt is

going to understand you’re shopping around. They will tailor their sales approach to your actions and

not overreact when you bring it up.

When evaluating multiple bids, make sure you’re comparing apples to apples. Are the part numbers

the same? Are the maintenance contracts for the same duration and include the same level of support?

Do the professional services cover the same items? (Note: This is very hard to do, but very important.

One common technique for vendors is to blur categories to make their bids appear more competitive;

don’t take offense at this tactic, just take it into consideration—be very aware of it—when making your

buying decisions.)

As mentioned in the previous section, RFPs are used frequently for getting multiple bids (especially

on larger purchases) because they help ensure that each vendor is being told exactly the same infor-

mation and being asked to provide the same information.

Set Up a Trial In some cases, you may not want to make the purchasing decision until you’ve had hands-on ex-

perience with the product so that you can do a thorough evaluation. Many software vendors allow

you to download 30-day evaluation versions of their product right off their website. Hardware ven-

dors are also eager to deliver a device for you to try for yourself. In some cases, the vendor will

work with you to set up the product or service. This works to your benefit as well as his—it reduces

the learning curve and setup time and the vendor is sure that the product is performing optimally

for you.

Reviewing Contracts with Vendors Depending on the size of your organization and the size of the contracts (in monetary terms), getting

formal legal help can be of great assistance in this situation. If your company isn’t big enough to have

an in-house lawyer, have the contracts reviewed by a legal consultant. Regardless, you should read the

contract and be able to understand the following:

• What exactly am I agreeing to?

• How much am I actually paying?

• What are my liability and rights?

• What are the vendor’s liability and rights?

In many contracts, the up-front portion contains some standard legalese that may go on for pages: issues

of confidentiality, warranty, liability, applicable laws, and so on. This is the part you really want the

1756.5 Managing vendors

legal experts to look at. They know if anything here is putting the company at risk. They will alert

you to:

• Any wording that they’re virtually forbidding you (i.e., the company) to agree to

• Terms that they’re uncomfortable with (for these they should suggest alternatives)

• Terms that they’re uncomfortable with, but recognize you’re unlikely to get changed (although they

will suggest you at least ask)

You need to turn your attention to the section called Terms and Conditions (also called “Ts and Cs”). As

an IT Manager, this section of the contract deals with items that you’re concerned about. This section

might cover areas like:

• Service level guarantees or agreements (SLAs)

• Specifications of hardware and software

• Support, maintenance, upgrade terms

• Automatic renewals

• Ability to return/cancel if not satisfied • Specific deliverables • Associated costs, time frames, and so on

Everything is negotiable. Don’t feel that just because it is on a form that you have to accept it. You may

end up accepting it, but at least know that you can ask for changes. Remember that whatever promises

your representative gave you are of no value unless they’re in writing. If it is important to you, ask to

have it included in the Terms and Conditions. Also, remember that by the time you get to the nego-

tiating, your representative can virtually taste the commission he’s making from this sale. At this point

he almost becomes an advocate for you to his own Legal department. Take advantage of this ally.

Evaluating Alternatives Today’s technology environment is so complex and so charged with money that the number one rule of

buying any technology product has to be: “Be prepared.” Products have gotten so complex—and sys-

tems they are designed for have gotten so complex—that a simple “Yeah, this server can handle 1000

e-mail users at the same time” kind of statement no longer flies. You need benchmarks, you want other

clients’ stories, and you have to have objective data; in other words, when it comes to functionality, you

have to do your homework.

For important purchase decisions, set up a simple matrix that allows you to compare all of your re-

quirements and options. An evaluation matrix, as discussed in the next section, doesn’t make the decision

for you, but it clearly outlines your options and locates them conveniently next to each other. A formal

matrix is not required for every buying decision, and the cost and the importance of the purchase will

naturally dictate how much effort you want to put into analyzing things before actually buying.

However, seeing all the criteria and the items listed right next to each other can be of tremendous

value when trying to determine how important the issue is for you, which vendor to use, and which

equipment to buy. It also helps to ensure that you are using consistent criteria for evaluating all the

vendors. Some buyers then share that matrix with the winning vendor.

With larger purchases, an evaluation matrix can help document (perhaps to your boss or to Finance)

why a particular item was purchased instead of a competing item.

176 CHAPTER 6 Managing the Money

Set Up a Matrix There is a relatively standard set of metrics you can use to evaluate most technology products. Typical

evaluation matrices include:

• Functionality

• Price

• Performance

• Vendor viability • Training required • Vendor services • Scalability

• Support and service

• Interoperability

• Product’s position in the market

Functionality The most obvious question is: “Does this product do exactly what you need it to do?” These days, you

need to ask that question of a vendor several times. Yes, the data sheet on the network switch claims it

can handle speeds of up to X, but is that in the vendor’s perfectly controlled test environment? Is that

performance available “out of the box” or is it only available with some upgrades to the base model?

How fast can it handle real-world traffic, that is, your data center backbone?

If it’s something for your end-user community, they may be the key players in determining if the

product does what it needs to do, does it well, is easy to use, etc.

Price Although important, this generally shouldn’t be your only criterion. Rank other criteria for each pur-

chasing decision. This is good information to have on hand when someone from Accounting asks why

you purchased brand X over Y, or used vendor Z.

As discussed earlier in the chapter in the section “The Difference between Capital Expenditures and Operating Expense Items” on page 167, there are two components when evaluating the cost of a technology product:

• Capital Investment

• Operating Expenses and Total Cost of Ownership (TCO)

Capital Investment This is the short-term, up-front cost of an item. It includes the hardware and/or software and all the

associated components to make it do what you need it to do. For software, in addition to volume dis-

counts, you want to consider how the product is licensed (see the section “Licensing Models and Types” in Chapter 5, Software, Operating Systems, and Enterprise Applications, on page 146).

Operating Expenses and TCO In addition to the up-front capital investment, think of the costs for ongoing support and maintenance,

implementation, training, prerequisite hardware and software, conversion/migration, and so on. TCO

has become a much more popular method of evaluating products in the IT world. Competing platforms

1776.5 Managing vendors

vendors, for example, try to justify higher initial prices by claiming their TCO is lower when compared

over a several year period.

There are products where TCO isn’t relevant. If you are buying a server rack, there isn’t going to be

muchmaintenance, training, and so on required. But most other products you buy in IT do require some TCO evaluation.

TCO analysis is a large and complex field, filled with vendors, consulting companies, and compet-

ing theories. Depending on the size of your purchase, you may want to create your own TCO analysis

sheet. Include costs for capital investment, maintenance, support, training, consumables and supplies,

installation, and any other either company- or product-specific costs. See the section “TCO and Asset Management: What Are They?” in Chapter 7, Getting Started with the Technical Environment on page 196 for further discussion of TCO.

Vendor Viability Is this vendor one that is likely to be around for a while? Are they at risk of going under because they’re

a fledgling start-up or are they ripe for acquisition or merger? Depending on the type of purchase you’re

considering, this may be a key issue.

Training Required Will your staff need to be trained on this new product? Or is it something they can pick up on their own?

If training is required then this cost has to be considered. Is training readily available or is it offered only

twice a year and only in one location? Can the training be done at your site or via the Web?

Vendor’s Services Do you need, or will you want, professional services from the vendor to customize the product or help

with its installation or integration into your environment? This could be an important factor to help

ensure success, but it could also be a considerable cost. Use of a vendor’s professional services can

raise the cost of an implementation considerably, but also can help ensure success.

However, the vendor may be so eager to make the sale that he is willing to offer assistance, or train-

ing, at no charge. Similarly, will the vendor provide you with an opportunity to evaluate the product at

no charge?

Performance Hardware performance is often easily quantifiable. In addition to processor speed, a variety of other

issues can impact performance: type and amount of memory, how the device is configured, number of

processors, bus speed, amount of level-2 cache, among others. Performance benchmark standards are

common. Also, if a vendor starts touting the performance of his equipment using standards other than

those used in the industry, take it as a sign that his equipment may not perform as well. If everyone

knows throughput is the standard and you start hearing about duration, be wary. Ask about the ma-

chine’s throughput and be ready for a quasi-explanation about why that standard may not be correct.

Scalability Will the product scale to meet the size of your environment? When considering an enterprisewide application (e.g., e-mail), your test bed will probably be quite small. However, the results may be very

different when the product is deployed throughout your organization. Does the vendor know of another

company your size using this product?

178 CHAPTER 6 Managing the Money

Support and Service These can be critical components of an IT purchase. Products are getting more complex and their main-

tenance requirements are getting larger. Treat the item and the service options or contract as equally

important elements in the buying decision. One may appear to cost more than the other, and be more

important in the short term, but over time, the value of each can even out.

Also consider serviceability. Are parts easy to get? Does one vendor have long hold times on their

support line? (This can be easy to verify with a call from your office.) Will you be able to find staff or

training that can help maintain this item? Are technicians and parts available 24/7? How is the quality

of their tech support?

Interoperability Does the product integrate well into your environment or will it require specialized interfaces? Does the product adhere to industry standards or is it based on proprietary technology?

Product’s Position in the Market Is this a mature product? Are others using it? Is it considered a proven solution or is it more leading or

cutting edge? Neither one is better than the other, since its importance and worth depends on circum-

stances, needs, and tolerance for risk. You may be interested in a brand-new solution or technology as

a way of being innovative, differentiating yourself from the competition. However, if reliability and

stability are top priorities, a more seasoned and proven product will be the better choice.

6.6 MANAGING THE MONEY DURING DIFFICULT TIMES After years of incredible growth and economic expansion, 2008 and 2009 saw the greatest downturn in

the economy since the Great Depression. With layoffs and cutbacks, and with a global reach, virtually

no person, no company, and no country was spared its impact. It is also safe to say that your organi-

zation will again suffer difficult times in the future—cyclical swings, new competition, deteriorating

revenues, increased costs, and so on. As manager of the IT department, you will be called upon during

tough times to be involved in making sure that the company gets through it in one piece. During the

difficult times, you should be looking at three areas:

• Managing costs

• Looking for opportunities to leverage IT for increased business value

• Demonstrating leadership

As is usually the case, flexibility will be key. Management will not take kindly to resistance to change

during tough times. This will be a time when your leadership and your ability to maintain calm and

motivate your staff will count and be noticed.

Managing Costs Since IT probably has one of the largest budgets in the organization, it’s no surprise that management

will look there for significant cost-savings opportunity. There are tough choices to be made; in some

cases youmay have to incur smaller short-term costs as temporary work-arounds while you delay larger

projects.

1796.6 Managing the money during difficult times

Usually, one of the first places considered for cost savings is labor. Can employees be cut? Although

terminating anyone’s employment is a difficult thing to do, it is always a stark economic possibility.

(See the section “Layoffs andTerminations” inChapter 2 onManagingYour ITTeam on page 55.) Look carefully at your team. Are there any weak performers who aren’t carrying their weight? Are

there people assigned to projects that will be canceled or postponed? If other areas of the company are

cutting staff, that may be justification to reduce your support staff. Also, as discussed later in this chap-

ter, outsourcing may be a cost savings. Related costs such as contractors, seminars, and training are

easy costs to cut before having to look at trimming the staff.

Consider staff-related expenses. Can you use videoconferencing solutions (or other technology

offerings) to reduce the cost of travel? Is telecommuting an option to help reduce office costs?

What about IT’s current and upcoming projects? What can be delayed or canceled? Do you really

need to do that ERP upgrade this year—can’t it wait?What about your technology refresh plans? If you

currently refresh your workstations every three years, can you push it out to four years? Is there any

waste going on? Are you replacing monitors every time you buy a newworkstation, for example? Can’t

they continue to use their old monitors? Perhaps that SAN upgrade can be delayed another year.

Examine any project that was going to put in a new system or application. If you’ve done without that

application up until now, perhaps you can do without it a little longer.

What processes does IT have that are labor-intensive and can be automated? This can include work-

station imaging, software distribution, and patching. Can you use remote-control software for user sup-

port instead of visiting users’ desks? This may not impact costs directly, but it will make your team

more efficient and productive, and no one will fault you for doing that in tough times.

Call in your suppliers and explain the situation—they are mostly likely in the same situation them-

selves. Tell them that you’d rather not have to look for other, less expensive suppliers, but that is what

you’ll have to do if they can’t give you better pricing. Since they don’t want you to look into other

suppliers, much less switch to one, there’s a good chance that they will do something to keep you. This

is especially true of telecom and cell-service providers. You can also consider alternatives to standard

technologies, such as sending phone calls over the Internet (VoIP) to reduce traditional phone charges.

Immediately cut some of the niceties, such as team lunches and noncritical travel. These may not

amount to much in terms of your overall budget, but they help send a signal to the team about how

serious things are. Expenses related to training and consultants may also be initial targets when costs

have to be trimmed.

Leverage IT for Increased Business Value IT should always be looking to align itself with the business, but that is especially important during

difficult times. IT has a dual role here in that technology can help reduce costs, as well as support busi-

ness development activities.

There are some quick hits for IT to help reduce costs to the business.When the business cuts back on

travel, IT can deliver relatively inexpensive solutions to help mitigate the impact. This can include

videoconferencing (from vendors such as Polycom and Tandberg), Web-based conferencing (with so-

lutions such as Skype, webcams, Cisco’s WebEx, Adobe’s Connect, Citrix’s GoToMeeting, Micro-

soft’s Live Meeting), instant messaging, audio-conference call solutions (which you may already

have with your existing phone system), remote access solutions, among others.

IT can also help automate procedures that are currently heavily dependent on manual effort and

moving paper around. This can include items such as purchase/budget approvals, T&E processing,

180 CHAPTER 6 Managing the Money

and online report distribution/viewing. Are there systems that can be put in place to help reduce error

and improve quality so that time isn’t wasted redoing work?

Work with the different business areas to see how IT can help them. Are the customer service phone

systems, websites, and tools as effective as they can be? Are there tools that can help Marketing

and Sales mine existing data for increased business opportunities? What tools and technologies are

available to help the business areas innovate and differentiate themselves from the competition (as well

as reduce costs)? In tough times, the company may be looking to reinvent itself; make sure you are

prepared to show how IT can help make that happen.

Take a look at how different business areas are interacting. Is there sufficient collaboration and

sharing of information? Are the Engineering and Research and Development teams aware of the com-

plaints coming in on the support lines? IT can help implement tools and solutions to help ensure that

people have access to the information that they need and that different areas aren’t duplicating each

other’s work because everyone is operating in a “siloed” (isolated) fashion.

Solutions here probably won’t be free. However, if you can show clear value by either reducing

costs or helping the business gain/retain business and customers, management will be more than happy

to make an investment now for a payoff to come. However, during tough times, management will

probably want to see that payoff coming as soon as possible, not in five years.

Demonstrating Leadership Often IT is looked at as a cost center and a rather expensive cost center at that. Having a reputation like

that during tough times can hurt you and your department, which will in turn end up severely hurting the

business. As the IT Manager, you want to be sure that your department’s value is recognized by man-

agement and the rest of the company. Make it clear that IT is fully aware of the difficult times the

organization is going through and is fully involved by making sacrifices, proactively suggesting

changes, and helping other departments achieve their goal and cut costs.

Your leadership (discussed in the section “Leadership vs. Management” on page 13 in Chapter 1, The Role of an ITManager) is more important when the going gets tough than it is during times of growth. Your company’s management and business leads will be looking to you for cost cut-

ting and for new solutions to help drive the business. Show them that you are proactive and creating

opportunities, that you’re coming to the table with ideas, and that you are adjusting priorities properly.

Where possible, investigate how your competitors are doing during these times and what steps they are

taking. Stay on top of what’s going on by reading more than IT journals. Be aware of what’s going on in

your company’s industry and the business world in general. You need to know how different events

affect the economy, your company, your department, and your job.

At the same time, your team will be looking to you for guidance. They’ll be nervous and uncertain

and will look to you for your calm (at the very moment that you’re trying to hide your own sense

of uncertainty, of course). These are great times to increase your visibility to your team and the depart-

ment. Be open and honest with communications, acknowledge that things are tough, but also talk about

the steps the company is taking and the ideas being considered. You won’t completely eliminate your

employees’ nervousness, but if they feel fully informed, you can certainly mitigate it to a great extent.

Nothing helps reduce panic more than showing that you’re aware, concerned, and taking action.

Finally, solicit feedback from everyone—your team, your peers, your management, and your sup-

pliers and vendors, as well as colleagues at other companies.

1816.6 Managing the money during difficult times

6.7 OUTSOURCING AND OFFSHORING Managing your staff and your resources is a major task of an ITManager. Outsourcing in all of its forms

can be a very effective tool for helping you accomplish that task. But as you can imagine, outsourcing is

not without its own associated costs (see Table 6.2 for definitions).

There are many tasks that you and your department perform. There are some that you perform be-

cause you have to, but you would gladly assign them to someone else given the opportunity. Perhaps doing these tasks chews up valuable skilled resources that you could use better somewhere else, per-

haps your department doesn’t do them well because they fall outside your core competencies, or per-

haps no one likes doing them for other reasons.

Companies outsource a wide range of tasks; some send their Help Desk departments or their entire

application development and maintenance. Others may use third-party services for their data center or

to monitor the network.

One way to think about outsourcing is to think of one company with one kind of expertise—

developing software, for example—hooking up with a company that has a different kind of expertise,

such as accounting. Could the first company build its own billing system if it wanted? Yes. But it

might be less expensive, get better results, and have fewer headaches if it contracted to have another

company do it.

There are entire companies dedicated to the process of helping you outsource your tasks.

Offshore Outsourcing Overview Sending work overseas is a much more drastic method of outsourcing—“drastic” both in a good and in

a bad sense.We’ll outline the positives and negatives of doing this (see Table 6.3), but keep in mind that

offshore outsourcing is a very controversial idea. The decision whether to contract with an offshore company (some people would call that “sending local jobs overseas”) isn’t likely to be made entirely

at the IT level, but here are some things to think about if you are called in and asked for your

recommendations.

Table 6.2 Outsourcing Definitions

Term Definition

Outsourcing When one companymakes an agreement with a second company to provide services that the first could provide, but chooses not to. IT companies often outsource portions of their software development, for example. They might do this for various reasons (see the discussion later in this chapter), but the important point is that they could perform that task if they chose to. Using a third party to perform a task your company doesn’t normally do—say you develop software but you need your new offices wired for electricity, so you hire an electrical contractor—is not outsourcing.

Offshore outsourcing

Arranging with a second company to provide services that the first company could provide but chose not to—and the second company isn’t located in your own country.

A common example of offshore outsourcing is a company in, say, Redmond, Washington, USA, contracting with another company in, say, Bangalore, India, to help it with its software development or customer support.

182 CHAPTER 6 Managing the Money

Outsourcing and offshoring can be very challenging, and while it can save money, companies have

to be careful about what it means to the quality of work and impact on customers and operations. In a

2007 global outsourcing survey by KPMG LLC, 60 percent of the respondents said that problems with

outsourcing are related to people. In 2005, Sears, Roebuck and Co. ended a $1.6 billion/10-year out-

sourcing agreement it had signedwith CSCCorporation just a year earlier for “failure to perform certain

of its obligations” (www.computerworld.com/industrytopics/retail/story/0,10801,101774,00. html). J.P. Morgan Chase & Co. abruptly canceled a $5 billion outsourcing arrangement with IBM Corp. Dell decided to return to U.S.-based call centers for its corporate customers when it was

deluged with complaints after shifting its support operations to India (http://www.techedgeezine. com/112603_dells_service_dehli.htm). The list goes on and on.

Table 6.3 Pros and Cons of Offshore Outsourcing

PRO CON

Many of the tasks that Americans have traditionally performed, especially in IT, can be done for less money in other countries. Americans have a high standard of living compared to the rest of the world, and programmers overseas aren’t paid at near the same rate. This is also true for Help Desk workers, data center employees, and software testers (among others).

The first negative is morale: If word gets out that you are replacing local jobs with overseas work, there will be significant employee issues to be dealt with. Among the public, not everyone agrees that globalization is inevitable and that themarch of jobs to the lowest paying corporation (wherever they may be) is the most efficient, let alone the most moral, course to take. Many companies now go out of their way to hide their offshore outsourcing agreements.

In addition to cost, another often-cited benefit of outsourcing work overseas (to India and Russia in particular) is that your company gets the benefit of a 24-hour work cycle. Once your Help Desk is finished with their workday in the United States, for example, they can then send calls to the second company located in India or Russia. Since these countries are virtually on the other side of the world, their workday is only beginning. This allows calls to be answered, open tickets investigated, etc., around the clock.

The overhead costs involved in establishing a smooth relationship overseas are significant. It still may eventually be worth your company’s while to do this, but there will be a steep cost curve at first.

It’s common now: By 2015, 3.3 million jobs will have been sent overseas, according to Forrester Research. As the offshoring trendmatures, U.S. firms will contract out increasing amounts of white-collar work such as accounting, drug research, and technical R&D.

There will be cultural considerations. While many IT workers overseas speak English, for example, and although many are trained in the United States, many workers are not. Different cultures have different laws about hiring, about contracting workers, different holiday schedules, etc. There will be some learning involved before both companies are comfortable with the arrangement and working together effectively. With the focus on security and compliance issues (see Compliance and IT in Chapter 8, page 226), many companies have concerns about exposing sensitive data to third parties in another country.

1836.7 Outsourcing and offshoring

Which Functions to Outsource At some point, your organization is likely to ask you to consider outsourcing. One of the first steps is to

consider which function(s) in your department is a candidate for outsourcing. While outsourcers will

tell you that they can run the entire IT department, that might be too big of a first step. An easy way to

dip your toe into the outsourcing waters is to first try functions that require minimal, or absolutely no,

knowledge of your company’s industry and/or operations.

For example, printer maintenance is something that is often outsourced. Just like you probably have

a third party taking care of your copiers, you can have a third party take care of your printers (consum-

ables, maintenance, repairs, monitoring, etc.). After all, a printer is a printer, and the outsourcer and

their technicians really don’t need to know anything about your company or your business (except

where the devices are and who the VIPs are). The same can be said for the routine functions of work-

station moves and setups. Other areas to consider outsourcing are shrink-wrapped software support for

those how-to questions about Windows, Excel, PowerPoint, etc.

When these functions are outsourced, not only are you freeing up your internal staff for those tasks that

require specialized knowledge of your industry and organization, but you may also be delivering a higher

level of service, as the outsourcer is well versed in that function. For example, if your existing Help Desk

gets a call from a user wanting to know how to do footnotes in Microsoft Word, there’s a pretty good

chance that your staffer would first do some investigating to figure out how to do footnotes and then walk

the user through it. If that call had gone to an outsourcer with a support staff that only does MS Office

support, there’s a good chance that the user would get a quicker and more comprehensive answer.

More complicated areas for outsourcing are those that require more specialized knowledge of how

your company operates or that involve functions that deal with sensitive or confidential areas (e.g., ap-

plication development, network security, HR or finance data). Not only will it take additional time to

outsource these areas (particularly for bringing the outsourcer up to speed), but many companies get ner-

vous about having some of the functions outside of their own control. However, there are still some ways

to find reasonable middle grounds. For example, instead of outsourcing network security and operations,

perhaps only outsource network monitoring. Instead of outsourcing applications development, perhaps

only outsource applicationmaintenance. Some companies would prefer to keep their outsourcing to those

items that are behind the scenes, and are less comfortable in outsourcing functions that will have direct

interaction with users and customers, such as Help Desk or customer service functions.

Another flavor of outsourcing is when companies “operate in the cloud,” which was briefly men-

tioned earlier and is discussed further in the section “Cloud Computing” on page 148 of Chapter 5, Software, Operating Systems, and Enterprise Applications.

Does Outsourcing Make Sense? Although there are a number of factors to consider when deciding whether to outsource, as a general

rule, determining if it makes business sense is the overriding concern.

The Business Consideration How will outsourcing benefit the company? Will it lead to cost savings? Will it provide better service

delivery, perhaps in terms of quicker turnaround or better quality? Will it somehow improve relation-

ships with customers or users? Will outsourcing improve the company’s image?

184 CHAPTER 6 Managing the Money

Answering these questions takes some careful evaluation and judgment. As mentioned earlier,

many outsourcing deals have been canceled because they didn’t yield the expected results. The follow-

ing steps are key in evaluating an outsourcing agreement:

1. Seek involvement of your user community at the outset. If you’re considering outsourcing the maintenance of your HRIS application, for example, make sure that representatives from HR

are involved at the very beginning to participate in the evaluation of outsourcers and buy in to

the decision.

2. Carefully articulate to the outsourcer as much detail as you can about the environment and your expectations. The more information you can give your outsourcer, the better they’ll be able to

understand the requirements and to provide a more accurate proposal. For example, in the earlier

example of outsourcing printer maintenance, you would want the outsourcer to know:

a. How many printers of each model you have b. The physical layout (separate buildings across town, a campus environment, or in a single

building)

c. Space you can provide for stocking parts d. What your expectations are for response and resolution times e. Requirements to provide loaner equipment if a printer can’t be repaired in a defined amount of

time

f. Requirements to provide updates on outstanding items g. Reporting requirements h. Requirements for any certifications of the outsourcer’s staff or operations i. Integration with, or use of, your internal call-tracking system j. Executive requirements (for escalated service levels)

3. Determine your own costs for currently executing this function (otherwise, it will be difficult to know if outsourcing will save you money). These costs can include:

a. Labor (salaries, contractors, training, benefits, recruiting, etc.) b. Office space for employees c. Related hardware and software (purchase, maintenance, depreciation) d. Third-party costs (for suppliers, vendors, partners) e. Connectivity/network costs

4. Understand the specifics of the outsourcer’s terms. For example, a. Are they operating 24/7 or 8 AM to 5 PM? b. What about holidays? Which holidays? c. What happens if you have occasional special requirements for off-hours work? What are the

costs?

d. What are the specific service-level agreements and what metrics are used to determine if those SLAs are being met?

e. What happens if an SLA isn’t met? Do you get a credit? f. What about less quantifiable items, such as “quality of work,” “professionalism and courtesy,”

and “language skills—written and oral” (these areas have been cited as the downfall of many

offshoring arrangements)?

g. What is your say in determining which of the outsourcer’s staff is assigned to your organization? You probably don’t want the outsourcer rotating people through your organization, but if one of

1856.7 Outsourcing and offshoring

them gets into an altercation with a VIP, you want to be sure that you won’t be seeing that person

again.

h. Are you responsible for providing the outsourcer with anything? Seating space? Phones? Computers? Network connectivity?

i. If your outsourcer is going to be involved directly with your organization’s partners and sup- pliers, who will be signing those contracts and who is responsible for those obligations? What

happens if those relationships begin to deteriorate as a result?

j. What are the outsourcer’s responsibilities regarding confidentiality, security, and regulatory requirements?

k. If there are hardware/software requirements involved, who will be responsible for the purchases and support contracts? Will the hardware and licenses be purchased in your name or the

outsourcer’s?

5. Carefully check the outsourcer’s references. a. Speak to their customers who are similar to you (industry, size, requirements, etc.). b. Understand what things they would have done differently. What were the good and bad

learnings?

6. Make sure you factor in the effort to transition to an outsourcer, as well as what’s involved in ending the arrangement (either at contract’s end or earlier).

a. There will certainly be a start-up period in transitioning responsibilities to the outsourcer as their team begins to understand your environment. Is this factored into the proposal and the

costs?

b. During a start-up period you may need the outsourcer to have a project manager assigned to ensure a smooth transition and to provide reports and updates on the transition’s progress.

c. Your staff will probably be upset about having to do their regular work, as well as train what may very well turn out to be their own replacements. Are you prepared for the upheaval if key

members of your team start to leave?

d. What happens if the transition is not meeting your expectations? Can you back out? e. When the outsourcing arrangement comes to an end, regardless of the reason, the outsourcer

may not be as responsive or eager to assist in transitioning those functions back to you or to

another outsourcer.

These days there is an equally important factor: the political consideration.

The Political Consideration Outsourcing when jobs are scarce is a very controversial idea: outsourcing and offshoring can be down- right dangerous. Backlash against companies sending domestic jobs overseas is often visible and

embarrassing; be aware that even investigating the idea of offshoring can be politically sensitive.

Conclusion As you can see, digging into this topic is not easy and can take some time. It’s not unheard of for large

outsourcing deals to take 6 to 12 months or longer to be evaluated and put in place. However, armed

with all this information, you should be able to start doing a benefits analysis to determine if out-

sourcing makes sense and what the risks and benefits are. Of course, it’s unlikely you’ll be deciding

this alone. You can expect your management to be involved, as well as Legal, Finance, HR, and, as

mentioned at the very beginning, the users.

186 CHAPTER 6 Managing the Money

Remember, outsourcing generally doesn’t eliminate headaches, it often only swaps one type of

headache for another. Instead of the headaches of managing that function directly, you now have

the headache of managing the outsourcer—to say nothing of handling the negative PR.

6.8 Further References Websites www.aicpa.org (American Institute of Certified Public Accounts). www.fasb.org (Financial Accounting Standards Board). www.megameeting.com (Web conferencing solution). www.microsoft.com/livemeeting (Web conferencing solution). www.polycom.com (videoconferencing solution). www.tandberg.com (videoconferencing solution). www.webex.com (Web conferencing solution).

Books and Articles Barrow, C., 2008. Practical Financial Management: A Guide to Budgets. Kogan Page, Balance Sheets and Busi-

ness Finance.

Beulen, E., Ribbers, P., Roos, J., 2010. Managing IT Outsourcing. Routledge.

Bulkeley, B., 2011. The Budget Conversation. CIO Magazine June 15.

Cone, E., 2009. Managing Through Tough Times. CIO Insight January/February.

Droms,W.G., Wright, J.O., 2010. Finance and Accounting for Nonfinancial Managers: All the Basics You Need to

Know (Finance & Accounting for Nonfinancial Managers). Basic Books.

Garland, P., 2011. The CIO Imperative: Do More. Spend Less, Baseline Magazine July/August.

Hirschheim, R., Heinzl, A., Dibbern, J., 2009. Information Systems Outsourcing: Enduring Themes, Global

Challenges, and Process Opportunities. Springer.

Kimball, G., 2010. Outsourcing Agreements: A Practical Guide. Oxford University Press.

Lewis, B., 2011. Outsourcing Debunked: What’s real and what’s baloney in IT’s longest-running controversy.

Amazon Digital Services.

Nash, K., 2009. The Complexity of Reduction. CIO Magazine April.

Perkins, B., 2009. Take Advantage of the Recession. Computerworld March 9.

Pratt, M.K., 2009. 5 Recession Survival Skills. Computerworld March 2.

Ramsden, P., 2010. Finance for Non-Financial Managers (Teach Yourself Business Skills). Hodder & Stoughton.

Rustad, M., 2010. Software Licensing: Principles and Practical Strategies. Oxford University Press.

Stedman, C., 2009. Hard Times Hard Decisions for IT. Computerworld March 9.

Tollen, D., 2011. The Tech Contracts Handbook: Software Licenses and Technology Services Agreements for

Lawyers and Businesspeople. American Bar Association.

1876.8 Further references

CHAPTER

Getting Started with the Technical Environment 7

The most successful people are those who are good at Plan B.

James Yorke, Mathematician

CHAPTER TABLE OF CONTENTS

7.1 The Technical Environment ............................................................................................................189

7.2 Understanding the User Environment ..............................................................................................196

7.3 TCO and Asset Management: What Are They?..................................................................................196

7.4 Standards .....................................................................................................................................199

7.5 Technology Refreshing ..................................................................................................................201

7.6 Further References ........................................................................................................................202

In IT, it is too easy to be distracted by the exciting developments in hardware, security, networking,

mobile devices, and apps. However, as a manager, you also have to keep your eyes on those areas that

aren’t quite as alluring.While activities like tracking your total cost of ownership (TCO) and inventory-

ing your environment may be items you’re tempted to put off, you must not do this. In fact, taking a

formal inventory can be one of the activities that gives you an excellent understanding of what’s in your

environment, and how it operates—and is particularly valuable if your move to management came with

a change in companies. A first-hand knowledge of the IT environment, its history, the users, and

operation can help you to better define needs and future plans, as well as avoid repeating mistakes that

were made in the past.

7.1 THE TECHNICAL ENVIRONMENT What Do We Have Here? You probably have more technology in your environment than you realize. And it can be very difficult

to get a handle on it all. The value of carefully determining everything you are responsible for, however,

cannot be overestimated. Not only does it help you figure out your role, but it helps you understand the

amount of resources you have. In addition, an inventory gives you a sense of scale about the environ-

ment, and a feeling for whether resources are under- or overutilized—although you’re likely to find it’s

a combination of both.

IT Manager’s Handbook.

© 2012 William Holtsnider & Brian D. Jaffe. Published by Elsevier, Inc. All rights reserved. 189

Completing an inventory not only provides you with a frame of reference for what you’ve become

responsible for, but it is excellent information to include in a disaster recovery plan. (For more details

on developing a disaster recovery plan, see Chapter 9, Disaster Recovery on page 247.) Don’t be surprised if the existing infrastructure documentation is out of date (or nonexistent), with

the latest version in the minds of your staff. Your promotion is as good a reason as any for getting

current with documentation.

Making sure there is a complete inventory can be a very valuable tool for a wide range of different

projects. For example, when it’s time to do budgeting, and you need to determine how much to budget

for support and maintenance, a complete inventory can be very valuable. Similarly, when it’s time to do

something like an upgrade of an operating system, an inventory will let you see the range of hardware

and applications you need to test it with.

Define Your Scope In order to avoid being overwhelmed with information, you should start at the highest levels and work

your way down to the detail you think you’ll need. The level of detail you need as a manager varies and

generally depends on the size of your organization and the size of your staff. As a manager, you prob-

ably don’t need to be tracking nitty-gritty inventory details like serial numbers, firmware versions,

room and rack locations, etc.—but you want to make sure that someone on your staff is doing that.

An excellent way to determine the scope of your inventory is to think about a disaster recovery

scenario in which you have to bring the entire IT infrastructure up after a major failure (such as a fire,

earthquake, or hurricane). If you can walk your way through the entire recovery scenario, then your

scope is complete. If you find yourself guessing at some of the elements of your IT infrastructure, then

your scope needs refinement.

In this situation, a picture can be worth a 1,000 words. Very often the easiest way to get a clear view

of an environment is with a schematic diagram. Not only do they convey a great deal of information, but

your technical staff will probably find a diagram easier to create (and maintain) than the equivalent

material in text.

The Elements Wide Area Network (WAN) Environment A typical WAN schematic (see Figure 7.1) includes site locations, types of connections (VPN, leased-

line, MPLS, frame relay, Internet), backup communication facilities, carriers, bandwidth, firewalls,

DMZs, etc. You may also want to include types and number of servers, number of users, IP addressing,

key contacts, and street addresses. In many cases, you may have connections to third parties such as

service providers (e.g., payroll) or partners (e.g., suppliers or distributors). Not only do you want to

make note of the connections, but you probably want to indicate who is primarily responsible for

the connections and the hardware: sometimes you are, sometimes the third party is.

The WAN schematic should be updated regularly and distributed to members of the IT department.

It should be posted on the wall of the data center for easy reference. The network manager should have

it posted by his desk. It takes work to create one of these, and more work to keep it current. But it is an

invaluable aid to the entire department. If you do not have one, go make one. Many network manage-

ment tools have features to help you generate a WAN diagram.

190 CHAPTER 7 Getting Started with the Technical Environment

Local Area Network (LAN) Environment The LAN schematic is the next level of detail. A typical LAN schematic (Figure 7.2) drills down into

some of the detail of a particular site. It should include the topology, location, and connectivity of

switches, and routers. It should identify different types of cabling (copper, fiber). It can also

include room locations for various network equipment, model numbers for key components, IP

addresses, wireless capabilities and so on. Like the WAN schematic, the LAN schematic should be

regularly updated so that it is always current, and distributed widely so it is available for easy reference

to all who need it.

If your responsibility includes the phone system, it may also be appropriate to include information

about the voice environment on the LAN schematic, especially if you’re using VOIP. This data will

include information about the switch, the voice-mail environment, trunks, and so on.

Carrier Connections The carrier connections inventory goes into the details of theWAN connections that were defined in the

WAN and LAN schematics. Items to track here include circuit numbers, circuit endpoints (including

building and room numbers), carriers, type/speed of line (T-1, analog, ISDN, etc.), and phone numbers

for reporting problems. Although telecommunications in the United States is very reliable, problems

Rome Italy Cisco 2821 Int IP 10.10.60.255

Frame Relay Cloud

New York HQ Cisco 7606 Checkpoint Firewall

Sydney Australia Cisco 2821 Int IP 10.10.50.255

Colorado Cisco 2801 Int IP 10.10.40.255

Chicago Cisco 2821 Int IP 10.10.20.255

Detroit Cisco 2811 Int IP 10.10.30.255

Public Internet

T1 Ckt 81379AF12

E1 Ckt FT98712987-H

T1 Ckt KJ121141-23

T1 Ckt FZ98713453

T1 Ckt FT98712987-H

DS3 Ckt G9123BC12

T1 Ckt AK1358797E1

Ckt AU652234 Site-to-site Virtual Private Network (VPN)

Private Virtual Circuits (PVC)

FIGURE 7.1

Example of a WAN schematic.

1917.1 The technical environment

still come up.When a line goes down, you don’t want to find yourself asking, “Which line?” and scram-

bling to find the circuit number or who you have to call to report the problem.

In larger environments, there are so many lines and so much activity with regards to adding, chang-

ing, and canceling them, it is quite easy to lose track. It is not unheard of for large IT environments to

discover that they’ve been paying the bill on a line that they didn’t know they had, and had stopped

using years ago.

Server and Storage Environment The documentation for the server environment drills down further and starts to give insight into how the

applications work. In many cases, you may not be able to get all the detail you need into a single

diagram. For example, you may find that you need one diagram just to indicate the basics, and others

to talk about how key architectures (e-mail, active directory, storage area networks, etc.) are set up

(e.g., indications of flow of data, like inbound and outbound mail, or servers that are operating in a

cluster, etc.).

The documentation should also include which servers have Virtual Machine (VM) environments

and some information about them. Of course, since VMs can be created, moved, and removed so easily,

the value of detailed documentation for them could be short-lived, and it may be better to just refer to

the information available from the VM management tools.

1st floor VLAN01, 10.59.1.0/23

2nd floor VLAN02, 10.59.2.0/23

3rd floor VLAN03, 10.59.3.0/23

4th floor VLAN04, 10.59.4.0/23

5th floor VLAN05, 10.59.5.0/23

6th floor VLAN06, 10.59.6.0/23

7th floor VLAN07, 10.59.7.0/23

8th floor VLAN08, 10.59.8.0/23

9th floor VLAN09, 10.59.9/23

VLAN 100 10.59.100.0/23

Internet Connection

VLAN 59 10.59.59.0/23

Data Center Servers

FIGURE 7.2

Example of a LAN schematic.

192 CHAPTER 7 Getting Started with the Technical Environment

Mobile Equipment Because mobile devices are so frequently purchased, lost, stolen, and replaced, this is a challenging list

to compile and keep current if ever there was one—challenging, but important. The replacement costs

in dollars aren’t always high, but the security and manpower costs can be large. Spend some time now

to save yourself a lot of heartache later.

Sample items to track include:

• Cell phones (company-owned ones only—you’ll raise eyebrows by asking about personal ones)

• Netbooks, laptops, etc.

• Tablets

Information here should include carrier, model, OS, and so on. Tracking mobile devices can be very

difficult. Some of the carriers and vendors have reports and tools to help, and some third-party vendors

are also starting to provide offerings. Some mobile devices now come with (or you can easily install)

tracking capabilities.

Workstations Keeping track of workstations can be an enormous headache because there are so many of them and

there is a lot of activity with regards to refreshing, upgrading, and physical movement. As a manager,

you should really be keeping track of only summary information (and leaving the details of the

inventory to your staff and automated tools). Important summary information can include:

• Device make and model • OS platform and version (Mac, Windows, Unix)

• Date acquired

• Configuration (processor, RAM, disk space)

You may also want this information broken down by department or location.

An often-forgotten portion of the total number of workstations are the ones that are remote: users

who travel, users who have company equipment at home, etc. These often fall into the out-of-sight, out-

of-mind category. It is important that these devices be treated like any other company workstation so

that they can be tracked, maintained, and updated properly. And when an employee leaves the com-

pany, you can expect HR to ask IT if that employee has any computer equipment at home. Some asset

management tools can track when a device last connected to the network. If a device hasn’t connected

in an extended period of time, it can mean the device has been lost or stolen, or perhaps just isn’t in use

and can be repurposed for use elsewhere in the organization.

Application and Software Inventory We’ve suggested diagrams for getting an understanding of some of the components of the infrastruc-

ture environment. For the applications, it may be best to resort to a good old-fashioned list (although for

complex applications with lots of data flowing in and out, a diagram can be very helpful).

When thinking of applications, we generally think of the big business applications (such as supply

chain, HRIS, payroll, accounting, e-mail, etc.) But as long as you’re developing an inventory, you

should also include all the tools in use—application development tools, desktop tools (e.g., word

processing, Internet browsers, etc.), infrastructure tools (e.g., backup and monitoring, etc.).

1937.1 The technical environment

An application inventory can include items such as:

• Application name

• Brief description

• User community (departments, number of users)

• Current version number

• Vendor

• Number of licenses purchased • Terms of support and maintenance agreement • Database environment • OS environment

• Integration to other applications

• Support/maintenance arrangements in place (and expiration)

• Whether the application is considered critical

• What server(s) the application runs on

• What IT team is responsible for support • Where to find a copy of the current version • Installation information • Special considerations

• Special backup requirements

• Peak periods of use

• Executive usage

• Who needs to be notified when scheduling downtime, or when there’s an unexpected outage

Vendors You’re going to deal with lots of vendors, and each will have several contacts for sales, billing, tech-

nical support, and so on. It’s important to keep track of who you’re dealing with and any special

arrangements you have. Some vendors you’ll call so often that you’ll be exchanging stories about

vacations. For others, like vendors of legacy environments that you speak with only once a year or

so, this inventory will be very helpful.

This vendor inventory should also include information about your support arrangements with the

vendor. When there’s a problem you should know immediately where to turn to find out how to call for

service, including phone number and account number, and what levels of coverage you’re entitled to,

when your support contract expires, etc.

It is particularly important that the information be current and available to all who need it. You

don’t want to wait until there’s a component failure to learn that the support provider’s phone number

changed, or that your contract expired.

Tools for Tracking the Technical Environment There are a variety of tools out there that can you help you (and your team) track what’s in your

environment. Hardware vendors in particular have tools available to help you track and manage their

devices. In some cases, the tools will also integrate with other vendors’ products. Some tools can track

and inventory, some can do management and alerting, others will do configuration management.

194 CHAPTER 7 Getting Started with the Technical Environment

Many software vendors market management tools to integrate with products from a broad spectrum

of hardware vendors:

• Cisco

• Hewlett-Packard

• Dell

• IBM

• Symantec • Microsoft • LANDesk • NetSupport

• Absolute Software

• Computer Associates

• JAMF Software

• Remedy

• Sunflower Systems

The cost and licensing of these tools can vary widely. Sometimes, the product (or a “lite” version) may

be included when you buy the vendor’s hardware. In certain cases they may have to be licensed on a

per-seat or per-device basis. Some of these tools for gathering information about the environment are

stand-alone and others are part of larger suites. Many of these tools can integrate with some of the

others, some tools are more proprietary.

Most of these are really designed for your staff to use, but they can be a great start for assembling the

information you need. You probably won’t find the exact tools to assemble the information together in

the exact format you’d like (particularly those schematics), but you can use tools like Microsoft Excel,

Access, PowerPoint, and Visio for massaging and diagramming.

Oftentimes (e.g., the vendor list or application and software inventory mentioned in the previous

sections), the best route may be developing your own simple tool for doing it. Whether a small spread-

sheet or database, it may prove to be the best, quickest, and cheapest way, and allows you to set it up

exactly as you need it.

The Value of Good Infrastructure Documentation The documentation about the environment should be in a very readable format. The use of diagrams,

charts, schematics, and so on is very effective. Infrastructure documentation should be updated and

available to all (ideally in a shared directory on a server, or better yet, your IT intranet). Although this

type of documentation is considered valuable, many environments don’t have it because IT workers

often have little interest in creating documentation. However, not only is the documentation important,

but the process of having your staff collect the information and create the documentation can be of

value in itself. Naturally, you should work toward making the process of collecting this information

as efficient and as natural to your organization as possible.

In addition to putting them on your intranet or a shared drive, there will be other valuable places for

them. Hard copies (at home and the office) can come in handy for disaster recovery; your engineers will

probably appreciate some of the schematics being posted in the computer room. Your Help Desk staff

may value some of the information being posted on their cubicle walls for immediate reference.

1957.1 The technical environment

Show your staff that you use it and rely on it. Use the materials in your memos and presentations

to corporate management. And when your staff is discussing various plans and issues with you, bring

out the documentation and refer to it. Ask them to explain what they’re talking about using the

documentation they’ve given you.

What You May Find An inventory can uncover under- or overutilized resources, potential problem and risk areas, and

resources and facilities that were assumed to be working but may not be. It may uncover technology

that is outdated and no longer needed, or that needs to be upgraded. Or it may uncover resources pro-

viding similar or identical functionality that can be combined. It can also help you to feel comfortable

that your staff has a good perspective on their environment.

7.2 UNDERSTANDING THE USER ENVIRONMENT One of the recurring themes in this book is the importance of understanding who your users are, what

they need, and what are they doing that could impact or benefit you. We discuss these issues in detail in

other parts of the book:

• The section “The First 100 Days” on page 20 in Chapter 1, The Role of an IT Manager, explained that you need to determine who the members of your team are and who your customers

are; and that there are different user areas that will require your attention, and different user areas

whose attention you require.

• The section “People to Meet and Know” on page 24 in Chapter 1, The Role of an IT Manager, identifies many people you should establish relationships with, including your staff, your peers, and

your boss, but it doesn’t end there. • As discussed in the section “Communicate with Your Team” on page 32 in Chapter 2,

Managing Your IT Team, communicate your vision for the department to your staff. They should understand both where you want the department to go and the plans you have for getting there.

• Users of different generations may have different priorities, styles, and preferred ways of dealing

with others, which is discussed in the section “Generational Issues at Work” in Chapter 2, Managing your IT Team on page 57.

• All of Chapter 10, Working with Users, on page 263, is devoted to the relationship you and your team have with the user community, and why it is one of the most important relationships you will

have to maintain.

7.3 TCO AND ASSET MANAGEMENT: WHAT ARE THEY? Two phrases that have garnered a lot of attention for IT managers over the past few years are asset

management and total cost of ownership (TCO). Many people use these phrases synonymously;

although they are similar, they are not identical.

Both of these phrases are most often used in reference to laptops and desktops. IT people certainly

realize that with a population of several hundred or several thousand desktop computers in a company,

196 CHAPTER 7 Getting Started with the Technical Environment

it takes an enormous amount of resources to support, manage, and track them. On the one hand, there

are many hidden costs associated with these devices, their use, and their support. On the other hand,

there can be significant savings in effectively managing these devices.

Although TCO and asset management are most frequently used in conjunction with devices like

desktops and laptops, the concepts are readily applicable to other equipment types, like servers and

network gear, as well as software applications.

Total Cost of Ownership Total cost of ownership is a term used for the sum of all the costs associated with a computer, in ad-

dition to the obvious costs of hardware and software. There are many published studies about the true

cost of a personal computer; annual TCO figures range from $3,000 to $12,000. There is endless debate

about the true number, and of course, the figure can vary significantly from company to company.

The discussions around TCO are usually very controversial. Although it can be easy to total the hard

costs of the hardware and software, the softer costs are much more difficult to calculate.

In addition to the cost of the hardware and software, items that factor into the TCO include:

• Cost of support (staff, consultants, vendors) • Network facilities (servers, applications, cabling, routers, hubs, etc.) • Training

• Administrative (purchasing, inventory, auditing, etc.)

• Money costs (capital, depreciation, etc.)

Some analyses have taken TCO to a very detailed level and have included:

• Consumables (toner, paper, etc.) • Wasted user time (surfing the Web, looking at their Facebook page, playing games, and tweaking

settings of fonts, colors, screen savers, etc.— referred to as “futzing” among those who study TCO) • Downtime from problems like viruses, crashes, etc.

• Coworkers’ time (when user A has to stop doing his job because user B asks him a question)

Calculating the TCO At some point, someone may ask you about your organization’s TCO. Calculating it is not for the faint

of heart.

First, you have to calculate the current TCO—if you don’t, you’ll never know if the cost was

reduced. Capturing these costs isn’t easy because you frequently have to make assumptions, define

rules-of-thumb, and do some educated guessing. For example, if your Help Desk also takes calls about

problems with the phone system, you may need to subtract that portion of their time for calculating the

support costs for your computers.

Once you know what the costs are, and what they are being spent on, you have to evaluate which

ones can be reduced, and how much effort is required to reduce them, and ironically, how much it costs

to reduce those costs. For example, you may be able to reduce the hardware costs by negotiating better

pricing, or finding a new vendor. You may be able to reduce Help Desk costs by providing better train-

ing for the users—but how much will that additional training cost?

Once you’ve decided where you want to reduce costs, and the steps to do so, you then have to im-

plement them. But things are seldom as simple as they seem. You may find that the new hardware

1977.3 TCO and asset management: What are they?

vendor’s equipment is cheaper, but the quality isn’t as good, necessitating a lot of returns and calls for

service and repair. Or, it turns out that you can’t get users to show up for the training classes because

they are busy with other activities.

After doing all that, you now have to go back and remeasure your TCO. Having done it once,

it should be easier the second time. The most important consideration is to be sure to measure it

using the same sets of assumptions, educated guesses, and rules-of-thumb that you used the first

time—otherwise, you’re not comparing apples with apples.

The whole TCO process can be quite arduous and tedious and easily take a year. However, the find-

ings can be eye-opening. There are many consultants willing to help you with the process, of course.

How these consultants’ fees enter into the TCO equation (not to mention the cost of your time on the

project) also raises some interesting discussions.

The important thing to take away from this is that there are a lot of costs and factors associated with

information technology. As such, there are opportunities for tremendous savings by managing these

costs well—enter asset management.

Asset Management With all the cost variables mentioned in the previous discussion of TCO, it is critical for an ITManager

to keep a careful watch on costs. If TCO is the costs associated with computers, then asset management

refers to what you do to keep those costs down. These actions can include everything from policies and

procedures to technology issues. Like TCO, asset management usually focuses on desktop and laptops.

However, many of the same principles can be used with other resources. Some of the most popular asset

management techniques include the following:

• Maintaining hardware and software standards. The fewer the number of technology products

in your environment, the easier it will be to support, maintain, and administer, although this is

becoming increasingly more difficult to do for handheld devices.

• Outsourcing functions that can be done less expensively, or more effectively, to others.

• Using tools to automate manual and repetitive procedures.

• Investing in software distribution tools so that the technical staff doesn’t have to visit each work-

station to deploy software and/or upgrades.

• Employing disk cloning technology so that newly purchased computers don’t have to be loaded

manually with software. • Proactively checking for problems (e.g., virus checking, system monitoring, etc.) and performing

preventive maintenance (e.g., disk defragmenting).

• Having your hardware reseller preload your standard disk image on your workstations when they

ship, so that they can be deployed to users right out of the box.

• Using inventory tracking software.

• Implementing restrictions so that users can’t change system configurations and cause adverse

impacts. • Proactively deciding on upgrades, and replacements, as opposed to waiting for the unit to fail (or the

vendor to discontinue support). • Defining and setting appropriate hardware and software defaults.

• Providing support personnel with resources (training, reference materials, vendors’ support agree-

ments, etc.) to help them do their jobs.

198 CHAPTER 7 Getting Started with the Technical Environment

• Tracking software usage (frequently referred to as license metering) to ensure that you’re not

paying for more licenses than you need, nor risking being under-licensed.

• Performing upgrades only when they are deemed necessary and worthwhile, and you’ve tested them

to be reliable, instead of installing them every time the vendor releases one.

As you can see, most of these techniques and ideas are designed to reduce the demands on the support

staff and the number of interruptions that users encounter. This is because the most expensive factor

related to desktop computers is the labor—whether it’s the cost of the support team, or the cost of the users’ time when system problems prevent them from working.

Of course, if you’re going to be implementing asset management techniques to reduce your

TCO, you’ll want to know if you’re having any success or not. Most of the asset management tech-

niques listed earlier have an implementation cost, either in terms of hardware/software or staff time,

and so on. At some point you’ll have to make some value judgments to decide which to implement,

figuring out which might be the most worthwhile for your needs for the least cost. See the section

“SoftwareManagement Techniques” inChapter 5, Software, Operating Systems, and Enterprise Applications, on page 142 for additional discussion.

7.4 STANDARDS One of the classic jokes in this industry is the IT manager who says “yes, we’re a firm believer in stan-

dardizing, that’s why we have so many different standards.”

The benefit of standardizing on your technology is many-fold. It eases the support burden if there

are fewer products for the technicians to know all the idiosyncrasies of. It also means that you don’t

have to keep spares for as many product types. For devices like printers, it means your inventory of

consumables is simplified. And, it eases things for your procurement team and shortens your vendor

list. Those features can lead to shorter delivery times and better opportunities for volume discounts.

As the discussion in the next section will show, there has to be some flexibility in standards, par-

ticularly where users are concerned. And it is important to periodically review standards—perhaps

annually—to address changing costs, vendor offerings, requirements, industry directions, etc.

Issues That Users Care About When personal computing technology first started to become popular, it was quite common for orga-

nizational users to ask for specific products like an “IBMModel 80,” a “Pentium processor,” or a “laser

printer.”

Perhaps because of the ubiquity of technology, or the difficulty in keeping with the constant stream

of new products and technologies, those days have faded. Technology that users can see has changed so

quickly that users are now much less specific about what they ask for. There are so many new products

coming out so quickly, it takes a professional (that is, someone in IT like you) to keep up.

That’s not to say that users are completely uninterested in what they use. While users are less

interested in the specific processor in the laptop, they may be very interested in the make, model,

and operating system of their handheld devices. Of course performance is an issue, but it is not un-

common for end users to be more concerned about things that may or may not impact performance,

and are often related to “technology envy”—the phenomenon of making sure your technology

1997.4 Standards

keeps-up-with-the-Joneses (or coworkers). Similarly, issues related to how the product impacts their

daily life, as opposed to pure performance, are also important to users.

Items that fall into these categories include:

• Cordless mice and keyboards (to eliminate some wires)

• The coolest looking cell phone/handheld/tablet device (regardless of its capabilities)

• Monitor size

• The lightest and smallest laptops (for ease of travel) • Tower units to go under the desk (so that the valuable desk real estate is not taken up) • Desktop units (so that users don’t keep banging their knees) • Privacy and antiglare screens (especially in cubicle farms)

• Leather laptop carrying case vs. canvas

• Preference for devices in certain colors

For situations like these, IT can have standards and still provide some flexibility for the users. For

example, instead of insisting that all users use the exact same model laptop, two choices can be made

available. One option can be relatively small and light, easy to carry, and functional enough for the user

who just wants to do e-mail, word processing, spreadsheets, etc. when traveling; the alternative is larger

with a bigger screen and keyboard for those who prefer it.

For issues like ergonomic devices and anti-glare screens, the IT department should readily provide

whatever the user asks for. No one wants an employee going to the HR department complaining of

carpal-tunnel syndrome or eye strain because IT’s standards prohibit these relief-offering devices.

Regardless of the standards you set, you can count on exceptions as a fact of life. Nomatter how care-

fully you selected your standards, it’s only amatter of time before some executive asks for something that

isn’t a standard. Rank has its privilege, and it would be pretty unwise for you to say no. (If you do, expect

to hear from your boss informing you that he “reconsidered” your answer for you.) However, before you

say no, you can certainly have a discussionwith that executive, asking himwhat features of that device are

attractive to him, and showing him that those same features are available on the device that is part of your

standards. Hemay not care all that much because yours isn’t as cool-looking as the one hewants. But, it’s

a small sacrifice to keep an executive happy—and customer service is what IT is all about.

Issues That IT Cares About While IT needs to offer greater flexibility to accommodate the individual needs and preferences of

users, it has greater latitude in defining the technical standards that are generally beyond a user’s

interest or concern.

Because technology products have a limited life span (generally 5 years or less), and product

offerings are changing so fast, it’s unlikely you’ll ever have a 100 percent standardized environment.

But that doesn’t mean you should just throw in the towel. In fact, the opposite is true: this is an

important issue that you will be working on continuously.

IT should standardize on:

• Hardware configurations (memory, disk, etc.).Most of these items are now pretty modest in cost. Choose configurations that should last the life of the machine. The cost of an additional 1 GB of

RAM is miniscule compared with the effort to do an upgrade after the fact (order, receive, payment,

installation, interruption to user, etc.).

200 CHAPTER 7 Getting Started with the Technical Environment

• Operating system and application software (vendor and version). The more consistency in your software set the greater the chances of full compatibility of files among users, and the easier the

support and training burden is on your staff.

• Software configuration (options, settings, directory and menu location, etc.). It’s not uncom- mon for application software to have over a hundred various settings (e.g., where to store files, how

often to do an automatic backup). Users are unlikely to ever know about these, and less likely to deal

with them. Let IT set standards so that software operates identically for all users. Again, it will pay

dividends in the future in terms of support effort.

Standards for IT In addition to technology put into the hands of the users, there are technology products that users are

unlikely to ever see (although they may hear them referenced by IT). These include products like

servers, routers, switches, storage solutions, gateways, and network operating systems.

IT’ers may have strong feelings about certain products in these categories, but they are unlikely to

be swayed by secondary issues such as color or packaging. Perhaps that’s because IT’ers deal with so

much technology that some issues are unimportant while others are paramount. Nontechnical people

are often surprised by the IT department’s standards for using technological products, but they forget

that people in IT not only have a deeper understanding of the core technology of the product, they gen-

erally have a longer history with the issue in general. IT people know what it means to purchase and

install a new product from Microsoft versus one from a startup; the startup’s product may have many

more bells and whistles, but will the young company offer tech support, volume discounts, maintenance

upgrades—and will it even be around two years from now? Is the product stable? And how well does

that startup’s product integrate with everything else in the environment?

It is generally easier to define these behind-the-scenes standards by finding agreement among some

of your more senior engineers. If you have consensus at the top, the rest of the team will probably go

along easily. Some may disagree (making a case that choice-X is a far better solution than choice-Y),

but unless they feel quite strongly about it, they will readily participate in adopting uniform standards.

And, just like workstations for the users, infrastructure technology should have standards for con-

figuration, setup, etc. In an environment that has a large volume of servers, for example, engineers

should not have to hunt for the location of log files. They should know that all servers are set up iden-

tically (including naming conventions) so that when there is a problem, they can spend their time ex-

amining the log file, not looking for it. A comparable analogy can be applied to virtually all technology

platforms and makes the case for standardization pretty evident.

7.5 TECHNOLOGY REFRESHING Different types of technologies have different lifetime expectations. Workstations may have a useful

life of 3 to 4 years, as do servers. Networking equipment, like switches and routers, may easily last 5

years, printers may last even longer. On the other hand, laptops and handheld devices are on the shorter

end of the spectrum simply because they physically take more abuse, are subject to being lost or stolen,

and the technology for these products is still evolving rapidly.

Some organizations may set defined refresh cycles, while others may choose to use things until they

simply won’t operate any more.

2017.5 Technology refreshing

Deciding which path to take depends on a few factors:

• The cost of vendor warranties after a certain point. A new server may come with a three-year warranty and service contract, but getting a contract for a four-year-old server may be cost prohib-

itive. To make this decision, you have to factor in how critical the device is to the environment as

well as the cost of the service contract compared to the cost of a new device.

• How easy it is to replace a device that fails. If a printer fails, it’s generally not that difficult to press another one into service. Replacing a server could require considerable effort and (down)time

before the new one is up and running. • How Accounting depreciates IT assets. Length of depreciation policies vary from company to

company; work with your Accounting department to determine what these particular procedures

are.

• How your company views IT spending. Some organizations see IT as critical and strategic to their operation and fully endorse having it remain current. Other organizations see IT spending as merely

a cost of doing business (like paying the electric bill), or a necessary evil. SeeChapter 6,Managing the Money on page 161 for more information on the topics of IT spending and asset depreciation.

The most common point for refreshing a piece of technology often comes when the organization can no

longer bear the cost of the existing technology:

• Vendor support is unavailable, or cost prohibitive.

• The technology is no longer meeting your needs.

• The technology presents risks to the environment (reliability, security, etc.).

• The technology is holding up other IT projects (e.g., the latest software from your database vendor

won’t run on your aged server).

As you can see, the costs are not always dollars and cents. It will be your job to assess these costs and

move to refresh the technology before the cost of not refreshing becomes too high.

7.6 Further References Websites www.altiris.com (technology management solution vendor). www.ca.com (technology management solution vendor). www.cisco.com (technology management solution vendor). www.dell.com (technology management solution vendor). www.hp.com (technology management solution vendor). www.ibm.com (technology management solution vendor). www.intel.com/standards/execqa/qa0904.htm (Craig Barrett on the Importance of Global Standards). www.ipswitch.com (technology management solution vendor). www.landesk.com (technology management solution vendor). www.microsoft.com (technology management solution vendor). www.netiq.com (technology management solution vendor). www.netsupport-inc.com (technology management solution vendor). www.novell.com (technology management solution vendor). www.opsware.com (technology management solution vendor).

202 CHAPTER 7 Getting Started with the Technical Environment

www.peregrine.com (technology management solution vendor). www.remedy.com (technology management solution vendor). www.sunflowersystems.com (technology management solution vendor).

Books and Articles Bansal, S., 2009. Technology Scorecards: Aligning IT Investments with Business Performance. Wiley.

Hasselman, C., 2011. Value Driven Enterprise Architecture. CreateSpace.

High, P.A., 2009. World Class IT: Why Businesses Succeed When IT Triumphs. Wiley Press/Jossey-Bass.

Meyers, M., 2009. CompTIA Networkþ Guide to Managing and Troubleshooting Networks. McGraw-Hill. Shane, S.A., 2008. Technology Strategy for Managers and Entrepreneurs. Prentice Hall.

Turban, E., Volonino, L., 2011. Information Technology for Management: Improving Strategic and Operational

Performance. Wiley.

2037.6 Further references

CHAPTER

Security and Compliance 8 If you don’t like their rules, whose would you use?

Charlie Brown

CHAPTER TABLE OF CONTENTS

8.1 How We Got Here ........................................................................................................................206

8.2 Managing Security ......................................................................................................................209

8.3 Security Solutions and Technologies ............................................................................................214

8.4 Types of Threats..........................................................................................................................224

8.5 Compliance and IT.......................................................................................................................226

8.6 The Rules....................................................................................................................................227

8.7 How to Comply with the Rules ......................................................................................................234

8.8 Hidden Benefits of Compliance.....................................................................................................237

8.9 Methodologies and Frameworks ...................................................................................................238

8.10 It’s Not Just Regulatory Compliance..............................................................................................242

8.11 Further References ......................................................................................................................244

(In)security is everywhere. Security is a critical component of an IT Manager’s life. Almost every

decision he makes will have to be evaluated at some point for its security implications. Hiring a

new programmer? How much access should that person have? Installing a new server? Who is allowed

to access it? Making sure that authorized people have the access they need (and only the access they need), along with making sure unauthorized people are blocked from access, has become one of the

many security-related themes of IT.

If confidential e-mails about unannounced merger or acquisition plans are posted on the Internet,

a lot of yelling happens. But security problems do not just cause embarrassing situations. If a database

with credit card and bank account information is hacked, or a laptop with employee information is lost,

then there are various laws and regulations you have to deal with (particularly related to notification).

You don’t want your CEO furiously knocking at your door, but you really don’t want law enforcement coming to see you.

And don’t ignore the costs of exposures. In 2011, the Ponemon Institute released the results of its

sixth annual survey, which showed that the average organization cost of a data breach was $7.2 million,

or $214 per compromised record. The study also found that negligence was the most common cause of

a security breach (41%), and another 31percent caused by malicious or criminal attacks (source www .ponemon.org/blog/post/cost-of-a-data-breach-climbs-higher).

IT Manager’s Handbook.

© 2012 William Holtsnider & Brian D. Jaffe. Published by Elsevier, Inc. All rights reserved. 205

It seems like major security breaches are a daily occurrence: Sony, RSA, Honda, the U.S. Defense

Department, and so on; losses from the events number well into the billions. The costs to repair these

lapses in manpower alone are staggering, let alone the price of damaged reputations, data loss, business

intelligence, national security issues, etc.

The topic of computer security has grown so large and complex that a single chapter can’t begin to

do justice to the topic. Security concerns are now so widespread that it’s essentially an industry within

an industry, with its own training classes, trade journals, certifications, job definitions, books, webi-

nars, and so on devoted to addressing the issue.

As a result, the primary goal of this chapter is to provide you with a framework to think about se-

curity, to outline the issues, and to point you to places where you can get more information.

8.1 HOW WE GOT HERE It is well understood in the technology community that in the 1980s, but especially in the 1990s, the

push was to connect everything and everybody. One of the original goals of Java was to create an op-

erating system so basic it would allow, famously, your toaster to talk to your computer.

Well, with handhelds, social networking, wireless, and countless ways to exchange and share data,

it’s safe to say that almost all that connectivity has been achieved. But it has come at a giant price. Little

or no thought was given back then to the consequences of allowing all those computers to connect to

each other. International and domestic groups of hackers with less-than-ideal motives have joined com-

munities, entered networks, and caused serious computer havoc all over the planet. The main challenge

was once how to share things electronically. The main challenge now is how to keep everything safe—

how to keep your data, your networks, and your company secure.

Get Perspective First, don’t be overwhelmed. Read this chapter to determine which issues you should start examining.

Not every threat will affect you; if yours is a virtual company, for example, you may have a different set

of security priorities and concerns than someone managing a traditional office setting.

The volume of threats, vulnerabilities, and risks is enormous. Even scarier is what we don’t know. If

you start thinking of all the ways your environment can be breached, you’ll feel inundated and feel

paralyzed. You need to take comfort in the fact that you’re taking the right steps to best protect your

environment. Remember, security protection is an ongoing and iterative process; you can never say,

“Okay, it’s done.”

Second, read the section later in this chapter on “Risk Analysis and Risk Management” on page 210 carefully. If it hasn’t been done already, perform a risk analysis. Finally, read the section on “The Rules” on page 227 in this chapter to help you understand what is expected in your industry, or required by different regulations. Lastly, read the sections, “How to Comply with the Rules” and “Methodologies and Frameworks” on page 234 for ideas on ways to ensure best practices for compliance.

206 CHAPTER 8 Security and Compliance

Computer Security Themes Within the discussions of security, several themes appear again and again:

• Security versus privacy versus convenience

• Intention matters

• CIA (confidentiality, integrity, and availability)

• Look very closely—it may not be what it appears to be

Security versus Privacy versus Convenience In security, the trade-off between privacy and security is a choice made all the time. Radio Frequency

Identification (RFID) tags, for example, are an excellent example of this duality. RFID tags are small

chips embedded in thousands—soon millions—of products.

These tags allow for the electronic identification of people, animals, and objects. A sweater you buy

at the department store can carry an RFID tag, for example. With RFID tags, your entire shopping cart

could be scanned in an instant at the checkout without having to remove every item to be scanned

individually. This is already being done in supermarkets in Europe (news.cnet.com/Tesco-to- track-milk-deliveries-by-RFID/2100-1033_3-6079022.html?tag¼lia;rcol).

However, as you go through your day, RFID scanners at other stores could also read those same

tags. Perhaps these other stores do this to get a sense of whether you’re a big spender or not, what your

clothing sizes are, or what their competition is selling. The uses for RFID chips are multiplying at a

dizzying rate.

Grocery store shopping lists are generally not held that close to the vest, but you might be surprised

at what you value when it’s taken away from you. During Super Bowl XXXV in Tampa, all attendees’

faces were surreptitiously photographed; those photos were then scanned and compared with images in

a police database of criminals and criminal suspects. Many people found news of that action profoundly

disturbing because it was done without permission or notification.

The aftermath of the World Trade Center attacks implemented a lot of debate about this topic, as

many people felt that some of the United States’ actions and laws to help prevent a recurrence would

sacrifice civil liberties and personal privacy.

The trade-off between security and convenience will only become more onerous. The long lines at

security gates at airports are an excellent metaphor for modern life; you can no longer just walk up to

the gate and board your plane. Nor can you just turn on your computer and start working. You need to

enter a password (perhaps more than one) to a machine that may be locked to your desk. Now pass-

words are often six and 10 digits long and have to be changed frequently. If you require “complex”

passwords (e.g., mixing upper- and lowercase, use of special characters, etc.) and those passwords can’t

be reused, your auditors will probably be thrilled. Finding an acceptable balance between security and

convenience is one of the greatest challenges in IT security.

However, you may find that users end up writing their passwords on Post-It notes attached to mon-

itors in order to remember them. Users complain mightily about issues like this, but the more educated

they are about the risks the company faces and their role in mitigating these risks, the less they will

protest. This issue is discussed throughout this chapter; in particular, see the section “Action 4: Work with Users to Make Everyone More Secure” on page 212.

2078.1 How we got here

Intention Matters White and black hats, hacking, mis-configuration or mal-configuration, adware, spam, phishing, spoof-

ing, and spyware are just some of the terms related to computer security, but one of the key points in

any security discussion is what was the intent behind the event? The results can still be devastating regardless of intent, but knowing the original purpose can sometimes help solve the problem more

quickly.

If your system has been breached by a malicious hacker, you need to take specific steps to address

the problem. If your system is overwhelmed by adware, you also need to address the problem. In both

cases, the entire system can come crashing down. But understanding that one event was the result of

malicious intent, and the other may have been the result of innocent user activity can help determine the

magnitude of the problem and how it’s addressed so it does not recur.

CIA The three basic tenets of information security are summarized with a classic acronym: CIA. It stands

for confidentiality, integrity, and availability. Learning about information security means learning

about “CIA.”

• Confidentiality refers to keeping secret information secret. Techniques for keeping things secret include cryptography, access control, and others. You may be protecting customer data or files for

next week’s presentation to the board. In either case, you want to keep confidential material from

getting disclosed accidentally or intentionally. In many cases, confidentially isn’t only a

professional/ethical obligation, but also a regulatory requirement.

• Integrity in information security means that data aren’t altered, either intentionally or accidentally, without proper process and authority.

• Availability means the systems are running and usable as they are supposed to be.

The CIA model, adopted from the military, has its strengths and weaknesses. It is a place to start think-

ing about security, but it isn’t the final answer. The Web is full of discussions about the pluses and

minuses of the CIA security model.

Look Very Closely: It May Not Be What It Appears Computer security now is often a matter of determining that one innocent-looking item—an e-mail, a

log entry, or a file change—is actually a sign of something radically different.

• Phishing is e-mail with a well-disguised intent. If they haven’t been already, you need to educate

your users on how to behave when they receive those fake requests that look like legitimate queries

for information from legitimate sources (like banks and financial websites), but aren’t.

• See the sidebar called Some Security Stories on page 225 later in this chapter for the story of how research into a $.75 accounting discrepancy led to the dismantling of an international

hacking ring. • Trojan horses and viruses are applications that appear to be something you want, but in reality

they’re just disguised files for malicious programs. Programs like these may be used for various

things like capturing passwords, looking for (or creating) vulnerabilities on your network, or

grabbing data from your servers.

208 CHAPTER 8 Security and Compliance

• Social engineering is a technique for gathering confidential or privileged information by simply

asking for it. Hackers have discovered that people have a general tendency to trust others; hackers

can get users to reveal items such as passwords, or to do something that’s essentially against policy,

by simply phoning the user and pretending to be from tech support, for example.

If you manage the person in charge of security, or you are that person, a very close examination of the

various elements of your system is required. You have to be able to tell quickly and often what is or-

dinary and what is even slightly out of the ordinary. See the section “Types of Threats” on page 224 later in this chapter for more information on this.

8.2 MANAGING SECURITY There are five actions that can serve as your guide to manage IT security:

• Action 1: Evaluate your environment’s needs, exposures, and defenses.

• Action 2: Get upper level management buy-in.

• Action 3: Mitigate the risks. • Action 4: Work with users to make everyone more secure. • Action 5: Remember that security is an ongoing process.

Action 1: Evaluate Your Environment’s Needs, Exposures, and Defenses The first step in most security problems is to determine howmuch exposure and vulnerability you have.

Perform a Security Audit In the world of computer security, determining your exposure and vulnerability is done by performing a

computer security audit. An audit like this can range from having your network administrator regularly

review logs, current levels of security patches, firewall settings, and policies to bringing in third-party

security auditing companies and outside consultants. The latter is often the preferred method, because it

eliminates any conflict of interest and built-in bias that could be associated with assessing your own

environment. Most companies of any size will use outside firms to assess their security as a means of

validation that the controls, policies, and technologies are working as the company had hoped and

planned.

The magnitude of your commitment to a security audit depends on two things:

• How big your company is • Which industry and which specific business your company is in

Naturally, a security audit for a garage-based start-up is going to take less time and money than one for

a corporation with 25,000 employees. But the first point may not be less important than the second: In these days of intellectual property awareness, it isn’t hard to imagine how valuable Google cofounders

Larry Page and Sergey Brin’s work was back when they were grad students just out of Stanford. And

while no company wants to lose data, most would agree that losing sales figures for a small furniture

company isn’t as disastrous as data lost by some of the private companies doing war time security

contracting for the government.

2098.2 Managing security

Regardless of size or industry, the first step you should take is to perform an audit. The goal of your

audit should be to clearly determine the level of risk you are facing now and any potential exposures

you can identify that you will face in the future.

Risk Analysis and Risk Management Risk analysis is the process of identifying the security risks throughout your system and the potential

loss for every threat that is identified. Risk management is the steps you take to address the risks iden-

tified as a result of your analysis. Most of this chapter is concerned with risk management; however, the

next section discusses risk analysis.

Risk Analysis There are two types of risk analysis: quantitative and qualitative. As their names imply, each ap-

proaches the same data in a different way.

• Quantitative. This method assigns numerical values to the amount of damage that would occur as well as the costs of prevention to any threats. Formulae include calculating the probability of a

threat occurring and the likely loss should one occur. Despite the supposed mathematical rigor

of this technique, subjective evaluations creep in. • Qualitative. This method generates an analysis of the risks facing an organization and is based on

experience, judgment, and intuition. While subjective by definition, efforts are made to make these

analyses as objective as possible.

Regardless of which method you choose (or, if you have sufficient time and money, you choose both),

know that there are many companies poised to help you conduct your analysis. As with every compo-

nent of this chapter, individual companies have arisen that are devoted to even the smallest corner of the

computer security world. The goal of a risk analysis is to provide a clear cost/benefit comparison. The

cost of securing an item is compared with the risk of losing it.

Risk analysis is performed throughout corporate America, not only in the computer industry. It’s a

formal requirement of HIPAA, for example. (HIPAA is the Health Insurance Portability and Account-

ability Act of 1996—see more information regarding HIPAA on page 228). The final security rule of HIPAA requires covered entities to “conduct an accurate and thorough assessment of the potential risks

and vulnerabilities to the confidentiality, integrity, and availability of electronic protected health in-

formation held by the covered entity.” In addition, the rule states that the “required risk analysis is also

a tool to allow flexibility for entities in meeting the requirements of this final rule. . .”

THREE COMMONWEAKNESSES I FIND AFTER I DO A SECURITY ASSESSMENT

When doing a security assessment, there are three major components that companies always suffer from:

#1 Weakness: Weak Internal Controls on People Companies need stringent controls on their employees. That does not necessarily mean watching their every move, tracking their every keyboard stroke, or monitoring every website they go to—although it canmean that, depending on the organization.

What “internal controls on people” really means is careful authentication to control who/what/when and which particular people can access which information. Eighty percent of security breaches occur because of improperly screened people and poor internal controls.

Continued

210 CHAPTER 8 Security and Compliance

THREE COMMON WEAKNESSES I FIND AFTER I DO A SECURITY ASSESSMENT—Cont’d

#2 Weakness: Mis-Configured (and Occasionally Mal-Configured) Devices Most hardware devices, servers, routers, and desktops now comewith security controls installed by default. However, these devices are often not configured properly, not patched properly, and not documented properly. Security is a 24/ 7/365 concern, not an “install-the-device-and-forget-about-it” type of activity.

#3 Weakness: Outside “Fingerprints” As a computer security consultant, I am amazed that corporations don’t take advantage of the large number of intrusion detection and intrusion prevention tools that are now available. Hackers are clearly studying these things, why aren’t you using them?

—Mark Willoughby Security Author and Consultant

Risk Analysis Tools There are many risk analysis tool options, but here are links to two free methods from well-known

sources (Carnegie Mellon and Microsoft):

• The Operationally Critical Threat, Asset, and Vulnerability Evaluation (OCTAVE) method. It’s a

complete, free, and thorough method. The method was developed by CERT at Carnegie Mellon

University (www.cert.org/octave/methodintro.html) and is federally funded. • Microsoft’s Security Assessment Tool at www.securityguidance.com.

Risk Management Once you’ve identified the risk using risk analysis, strategies for managing those risks can be defined.

Common strategies for managing risk include:

• Mitigate the risk by implementing controls, procedures, technology solutions, etc.

• Transfer the risk, perhaps by sharing the risk with partners better able to deal with it.

• Accept the risk by recognizing that it exists, people are aware of it, and it is being watched.

Even if no immediate steps to deal with risk are taken after the risk analysis is done, just being

aware of the risk can be a form of risk management as that knowledge is likely to influence future

decisions.

Hire White Hats (to Manage the Threat of Black Hats) In general, a hacker is someone who is interested in finding and exploiting security flaws of IT systems

and networks. The industry has stolen a paradigm from old cowboy movies to identify the good guys

and the bad guys as white-hat and black-hat hackers. Black-hat hackers are those you generally think of

with the term “hacker”—they’re interested in security flaws in order to take advantage and abuse

them—usually for profit, but oftentimes just to see what trouble they can cause. However, white-

hat hackers are interested in security flaws as a way of identifying how security can be improved

and how systems can be better protected. White-hat hackers are sometimes called “ethical hackers.”

In 2011, the hacker group LulzSec claimed that its activities included hacking into the CIA, PBS,

AT&T, and the Brazilian government’s websites. The group said that its motivation, in part, is because

these sorts of public attacks push websites to improve their security (www.cnn.com/2011/TECH/web/ 06/26/tech.lulzsec.hackers/).

2118.2 Managing security

Both white- and black-hat hackers have exceptional technical skills and are experts in operating

systems, networks, etc. Many black-hat hackers become white-hat hackers when they realize that their

skills should be put to use for good instead of evil. Sometimes, jail time or a fine helps them see the

light.

Action 2: Get Upper Level Management Buy-In Security is an issue that impacts every level and every facet of the organization. CEOs can have their

core company data compromised and security guards can have their keys stolen and their offices

broken into. Classically, a top-down approach works better: The security policies and procedures

are better aligned with the company’s overall direction. A bottom-up approach, where IT initiates

the direction, will generally not be as successful. Many organizations identify an individual to func-

tion as the Chief Security Officer (CSO). Depending on the company and the industry, this role may

exist within IT or may exist as part of the company’s executive team. This individual may tackle

issues related to physical security, computer security, IT policies, privacy, investigations, among

others.

See the section “Action 4: Work with Users to Make Everyone More Secure” on page 212 later in this chapter for ideas on how to get all employees in an organization to actively participate in making

security a part of all corporate activity.

Action 3: Mitigate the Risks Using the risk analysis process, you’ve identified certain exposures and vulnerabilities in the environ-

ment. Now you have to weigh those risks against the cost of mitigating them, along with navigating the

trade-offs of security and privacy.

Some of the different technology solutions for reducing risks are discussed later in this chapter in

the section “Security Solutions and Technologies” on page 214. However, many things can be addressed with simple solutions or procedural changes. For example:

• User education can go a long way: simple steps such as advising them on effective passwords or

reminding them to log off when leaving for the night can be very useful. Defining company policies

about security practice, safeguards, and guidelines provides additional emphasis. • Policies to track security-related requests: asking users to submit written requests via e-mail, for

example, for changes in security privileges (instead of a phone call to the network manager) is

an effective tool.

• Carefully tracking all changes to the environment with a change request (CR) system.

• Periodic review of IDs and privileges, and disabling those that are no longer needed, should be a

regular process.

• Being diligent about applying security patches and following vendor and industry best practices. • Very prompt disabling of access when an employee leaves the company should become a standard

practice in your department; ex-employees are a known source of security breaches. Many compa-

nies now cut off access the moment the employee is informed of their change in status. (See the

section “User Terminations” on page 216 for more detail.) In some organizations, employee ac- counts will be disabled automatically as soon as the employee’s status changes in the payroll

system.

212 CHAPTER 8 Security and Compliance

Many of these items can be automated so that the manual processes, confirmations, and such can be

minimized.

Action 4: Work with Users to Make Everyone More Secure If they aren’t aware of it yet (and many aren’t), you must convince every person in your organization—

for-profit or nonprofit—that computer and information security is everyone’s job. It’s a cliché to you—a computer system is only as secure as its weakest link—but to many other people, that statement

counts as wisdom. You must take this message “to the masses.”

Your users need to be made aware of security issues. For example, users should be aware of the

security pros and cons associated with storing a file on the LAN versus on their local hard drive. They

should be told how to password protect files that have sensitive information, and they should be aware

of the risks of printing certain information to a shared printer.

Users should be in the habit of logging off at night or when they’ll be away from their desk for an

extended period of time—better yet, look to implement application time-outs, and screensavers, that

automatically lock the screen or log out after a period of inactivity.

Finally—and often most commonly—users should be aware of the security risks associated with

sending (or physically taking) company files to their home machines. All the effort you put in to safe-

guard the company’s data can be superseded by an employee mailing themselves files to work from at

home. This was a practice that was not even noticed a few years ago but is now a very large concern in

today’s very mobile and always connected environment.

Training Users There are books, videos, consultants, and companies that can help you with this task. Like corporate

safety, computer security has become an enormous industry in and of itself. Train users about pass-

words, locking their workstation when they step away, and logging off at the end of the day. Users

must understand that security is not strictly about IT—your training should include topics such as

notifying the security guard if they see a stranger wandering the halls unescorted, locking file cabinets

and office doors, and using shredders for confidential documents. Also, don’t overlook guidance and

reminders about those purely innocent errors, such as leaving a confidential document in the copier or

discussing sensitive information in a public area (like an elevator!). Most sales reps learn early never to

discuss client names in public places regardless of how innocent the situation seems. However,

non-sales people are often overheard talking about the challenges of dealing with Client X or Customer

Y on subways, airplanes, etc.

Use these themes to regularly train your users in computer security. Security should be an ongoing

theme in the IT department, and users need to understand it. Look to make it part of the new-hire

orientation, as well as an ongoing program.

Be sure to consider generational factors when training your users, the younger generations may not

take your concerns as seriously. A 2010 Accenture study and report found that Millennials are likely

ignoring or violating your IT policies right and left, using non-standard applications and improvising

where they think it makes sense. In addition, the Accenture study found that Millennials routinely

bypass corporate approval when it comes to downloading and using technology (43 percent use

non-supported instant messaging, and 31 percent rely on rogue open-source technologies). For more

information about this issue, see the section “Generational Issues atWork” inChapter 2, Managing Your IT Team on page 57.

2138.2 Managing security

Employee Impact As mentioned earlier, in the computer security world, finding the right balance between privacy,

security and convenience can be very difficult. Users need to be aware of the fact that their computer

activity at work is monitored and that that monitoring is done for a variety of reasons, including

security—their own security, not just the company’s security.

Most companies have policy guides that indicate that company resources (such as the phone system

and computers) are for corporate use only—even if some personal use is unofficially acceptable.

The policies will often also indicate that the company has the right to monitor usage.

The explosion in the use of smart phones—it is the rare person in the corporate world who does not

have one nowadays—has caused this line to be blurred. What are personal phones, what are company

phones, what are personal calls on company phones, what is company usage on private phones? If any-

one asks you—and they probably will—the cleanest solution is to have individuals carry two phones. It

sounds ridiculous but is not that rare. (It is not the occasional personal phone call or the checking-

e-mail-while-on-vacation situation; it is the regular habit that causes problems for both parties.) But

many organizations have adopted more liberal approaches, especially those with a Bring-Your-Own

(BYO) program (seeChapter 11, Connectivity: Social Media, Handhelds, andMore, on page 287).

Use Care When Surfing Make your users aware that today’s computing world is a complex network that requires a more con-

scientious and careful computer user. Of course it’s certainly possible to accidentally go to an inap-

propriate website—we have all mistyped an address and found ourselves on a very different page

from what we were expecting. But repeated travels to those sites will be noticed and acted upon.

(See the section “Intention Matters” on page 208 in this chapter.)

Action 5: Remember That Security Is an Ongoing Process You’ll never be able to say: “Okay, we’re done, the environment is secure.” Security should be looked

at as an ongoing, iterative process. The IT staff should always be on the lookout for ways to improve

security. Audits and compliance activities should be viewed as welcome opportunities for continuous

reviews of security.

8.3 SECURITY SOLUTIONS AND TECHNOLOGIES With entire volumes dedicated to the subject of computer security technologies, a single chapter in an

IT book that focuses on the business issues (and not the details of technologies) cannot do it appropriate

justice. However, there are some basics you should be familiar with.

Tracking and Controlling Access Carefully control and monitor who goes in and who goes out of your systems: who enters your systems,

what they do there, and when they leave, as well as who enters your facilities and who and when they

exit it.

214 CHAPTER 8 Security and Compliance

Control Access A critical component of controlling access is to follow the Rule of Least Privilege: users should only be

granted the least amount of access to the system, and for the least amount of time necessary, as is au-

thorized and required for their job. More access and longer access time allow for more potential prob-

lems. Firewalls, access control lists, and other security measures can authenticate users to authorized

areas of networks without taking large risks and without spending a lot of money and time.

The rule originated in the Orange Book (part of the Rainbow series of Department of Defense books on computer security written in the early 1980s) and is officially defined as follows: “Least

Privilege—this principle requires that each subject in a system be granted the most restrictive set of

privileges (or lowest clearance) needed for the performance of authorized tasks. The application of this

principle limits the damage that can result from accident, error, or unauthorized use” (csrc.nist.gov/ publications/history/dod85.pdf).

The previous method of controlling access was called the “M&M model”: the idea was to

make your system “hard on the outside and soft in the middle.” That model is being replaced by

“de-perimeterization” techniques, which make your systems secure throughout. Onemethod of achieving security throughout your system is to implement secure zones. A University

of California information security site defines secure zones as “a combination of policies, procedures,

and technical tools and techniques that enables an organization to discreetly protect its own information

assets. It’s a logical and physical environment with strong visible management support in which access

privileges to all information assets are clearly defined and followed without exception.”

Tracking Activity A variety of methods can be used to track activity:

• System log files • Monitoring programs • Network mapping tools • Physical access

System Log Files Almost every technology solution (both hardware and software) generates log files of activities. The

level of detail that can be captured can vary tremendously from one product to another and is often

configurable by administrators. Servers, desktops, business applications, operating systems, network

hardware, and monitoring and management utilities—all have log files. Log files can indicate who did

what, at what time, on which device, and from where. Log files can be used for basic troubleshooting or

to investigate security issues. These files can be examined and monitored to track user activities.

Log files can be so voluminous that some vendors have utilities to allow for proactive monitoring of

them so that pre-defined event types trigger certain types of alerts and actions.

Monitoring Programs Similar to log files, tools exist that allow you to track all the activity of your network. In addition to the

old standard of tracking sites visited, you can now monitor programs used and keystrokes typed. One

example of this is a packet sniffer. A packet sniffer is a software package that can examine the data

traffic on a network. Typically, a sniffer is used to troubleshoot and isolate network problems.

2158.3 Security solutions and technologies

However, it can also be used when investigating security issues. For example, a packet sniffer can be

used to “trap” data to and from a particular device or can be used to look for particular content.

Network Mapping Tools In larger environments, it can be a daunting task just to be aware of everything on the network. While

the server side may stay relatively static, activity on the user-device side can be constantly changing

with printer and workstations being regularly moved, replaced, and added; to say nothing of handheld

devices and wireless connectivity. There are tools that can rapidly scan large networks and identify

which hosts are available on the network. These tools can usually identify some key aspects of the de-

vices, such as what type of device it may be (printer, workstation, switch), what operating system it is

running, and so on. Tools like these can help identify oddities that need to be investigated (e.g., “Why

are those workstations running server software?”).

Physical Access In addition to obvious building security (door locks, access cards, etc.), physical access to IT areas

should be controlled. Access to the computer room or data center should be limited to those individuals

who require it. Other IT areas (e.g., wiring closets) should be locked. Because of the concerns of con-

fidential content, printed report distribution should be controlled, and an industrial-strength shredder

(or third-party shredding service) should be available to dispose of output that is no longer needed.

Traditional tools for tracking accesswithin a facility, such as security cameras, access card readers, and

sign-in sheets, should also be considered part of the arsenal. Reviewing these periodically (particularly

sign-in sheets and access cards used for the data center) can be veryworthwhile. Simply asking your com-

pany’s security department to periodically review which employees have access cards that allow entry to

the data center demonstrates that you need to partner with them as part of the overall IT security process.

Accounts and Passwords Account Usage There are some basic principles in setting up accounts that can help ensure that they aren’t used for

unauthorized activities:

• You may be able to limit an account’s usage to certain days of the week and hours of the day. This

can be a worthwhile option for temps and consultants’ accounts. • You can often set an account to be disabled automatically at a certain date. This is also a good feature

to use for temps and consultants, as these users often leave the company with no notification to IT. • You may want to consider limiting how many times a user can log in simultaneously, or perhaps

limit it to two (so the user can log on from home even if they forgot to log out when leaving the

office).

• Review accounts periodically for usage. If an account hasn’t been used, for example, in several

weeks, it may be worth investigating. Perhaps the employee is on some kind of leave. After a de-

fined time, you can disable the account. If there is no further inquiry about the account after another

few weeks, it may be safe to assume that the account is no longer needed. • Unless otherwise justified and requested, new accounts should be given “plain vanilla” access priv-

ileges. Any request for additional access or privilege should be submitted in writing by an autho-

rized individual.

• Consider using special naming conventions for temps, interns, and consultants so that security

administrators can spot them easily and monitor their activity quickly.

216 CHAPTER 8 Security and Compliance

User Terminations Although it’s generally easy to ensure that accounts are created when needed (it’s easy because the user

keeps complaining until it is done), it’s more of a challenge to ensure that accounts are deleted/disabled

when they should be. Too often when an employee leaves the company, the IT security administrator is

the last to hear of it. HR should notify IT immediately of any employment terminations so that IDs can

be disabled and deleted. When an employee does leave the company, there should be a procedure for

moving her files, e-mail, and so on to another employee’s ID (perhaps a coworker or manager) so that

there is no need for maintaining the terminated employee’s ID. Look to implement automatic triggers

to disable user accounts when an employee is terminated, or if the account has not been used for an

extended period.

Passwords These should be at least six characters in length (many organizations now insist on passwords of eight

characters), should be forced to be changed regularly (but not so often that a user has to write down her

current password on a Post-It note attached to themonitor), and shouldn’t be the same as the user’s ID, nor

be a common word. When it’s time to change passwords, users should not be able to reuse the same one.

“Strong” or “complex” passwords are becoming increasingly popular. While the definitions of

these terms vary, it’s easy to understand them in comparison to “weak” passwords, which are easily

guessed. A password that is blank, is the word “password” or a string of characters (e.g., 12345, or

zzzzz), or that matches the user’s ID, is considered a “weak” password. Similarly, a password that

is the user’s date of birth or pet’s name is considered a weak password. Strong or complex passwords

are those words that can’t be found in the dictionary, often because they include special characters,

numbers, and both upper- and lowercase letters.

A 2009 survey by Elcomsoft (www.elcomsoft.com/survey/survey2009.pdf) showed that 50 per- cent of respondents use more than 10 different passwords across their various IDs and accounts. But,

11 percent use only 1–3 different passwords. It is likely that this is leading to behaviors that could

jeopardize IT security, as well as compliance initiatives. This was confirmed in a 2010 survey byWeb-

root (pr.webroot.com/threat-research/cons/protect-your-computer-from-hackers-101210.html), whose

findings included:

• Four in 10 respondents shared passwords with at least one person in the past year.

• Nearly as many people use the same password to log into multiple websites, which could expose

their information on each of the sites if one of them becomes compromised. • Almost half of all users never use special characters (e.g., ! ? & #) in their passwords, a simple

technique that makes it more difficult for criminals to guess passwords.

• Two in 10 have used a significant date, such as a birth date, or a pet’s name as a password—

information that’s often publicly visible on social networks.

• 50 percent of people feel their passwords are very or extremely secure, yet:

• 86 percent do not check for a secure connection when accessing sensitive information when

using unfamiliar computers. • 14 percent never change their banking password. • 20 percent have used a significant date in a password. • 30 percent remember their passwords by writing them down and hiding them somewhere like a

desk drawer.

• 41 percent use the same password for multiple accounts.

• Only 16 percent create passwords with more than 10 characters.

2178.3 Security solutions and technologies

• Four in 10 people (41 percent) have shared passwords with one or more people in the past year.

• Almost half of Facebook users (47 percent) use their Facebook password on other accounts and

62 percent of Facebook users never change their password.

Configure your system to automatically lock out an account after so many failed log-in attempts. Many

systems will automatically lock out an account after three failed attempts within a five-minute period.

The system may then be set to automatically unlock the account after another few minutes. While these

two steps may seem to be contradictory, the idea is to halt any brute-force attempts to guess a password,

while still allowing a legitimate user to eventually gain access. Brute-force attacks are done with pro-

grams specially designed to try every character combination until the right password is found.

Unchecked, a brute-force attempt can try tens of thousands of combinations in a single hour. With these

account lockout parameters, the program might only get a handful of attempts.

Special Privilege IDs Network and system managers usually have special IDs and passwords that provide carte blanche

access to systems. These are often called “root,” “supervisor,” or “administrator” accounts. Because

of their special access, only a handful of people should have accounts like this. System administrators

tend to ignore their own security rules and often set these passwords to never expire. It’s important that

these passwords be changed regularly and changed immediately when someone who knows them

leaves the company.

It’s a common best practice for ITManagers and administrators to use two IDs. One of them has the

special privileges they need for certain types of activities. The other isn’t privileged and is used for

routine tasks such as their own e-mail. The reason for two accounts is to minimize the amount of time

an IT administrator makes use of privileges, thereby reducing the risk of their impacting the entire sys-

tem by accident.

Administrators shouldn’t share a common privileged account, and each should have their own non-

privileged account. This helps identify actions and tasks with specific individuals and is particularly

helpful when examining log entries.

Another common practice is to rename, delete, or disable the default privileged account that’s

installed with operating systems and applications. Since hackers assume these accounts exist on your

system, they’re usually one of the first paths they try to use to gain access. At a minimum, you must

change the default password associated with these accounts.

Access Reviews Large environments may have thousands of users and hundreds of thousands, if not millions, of files on

their computer networks. Usually, groups of files are set up that can only be accessed by certain groups

of users, and vice versa. It’s important that some type of user administrator review these access priv-

ileges periodically (perhaps twice a year) to ensure that unauthorized users haven’t mistakenly been

given access to the wrong files.

Authorization Levels Security administrators who process the requests to grant and revoke privileges, change access, and

create IDs need to know who is authorized to make these requests. For example, the payroll manager

may be authorized to determine who has access to the payroll files, and the VP of sales may be

authorized to determine who has access to sales figures. It’s up to the IT Manager and the security

218 CHAPTER 8 Security and Compliance

administrator to make sure it’s clear who has authority over what and that these requests are documen-

ted. Most companies now require that IT be formally sent an e-mail—a trouble ticket in the IT Help

System, for example, for any kind of request. A manager’s request for an employee’s new software

upgrade, a user’s request for a new printer, or a request for access to a new part of the network all

now need to be formally requested, documented, and tracked. HR should alert IT of new employees

in advance of their start date so that IDs with basic privileges (e-mail, etc.) can be created.

Authentication Authentication is the process for determining if someone is authorized for access.

Challenge–Response Themost familiar and traditional form of authentication is known as challenge–response. The challenge

is asking the user a question, and the response is the answer provided by the user. When you are

prompted for your user ID and your password, you are participating in a challenge–response protocol.

Two-Factor Authentication Typically, access is based on what a user knows—usually their ID and password. Two-factor authen- tication bases access not only on what the user knows, but also on what they have. The what-they-have component is generally a 6-digit token provided by a device that users carry with them (small enough

to fit into a wallet or on a keychain). The device operates by displaying a number that changes every

minute. The user types in the number when logging in, and the number is validated by a corresponding

authentication server.

Two-factor authentication helps prevent unauthorized access resulting from the user telling some-

one else their password or by having their password guessed. Many companies use two-factor authen-

tication for their remote access security as a way of reducing the exposure associated with connectivity

from the public Internet. The SecurID solution from RSA Security is the most popular solution for two-

factor authentication. (But even RSA was hacked in early 2011, although there has been no detail as to

what the hackers may have done, and what information, if any, may have been stolen or compromised.)

Single Sign-On Although the situation is slowly improving, users are still burdened by having to remember a variety of

different IDs and passwords. Single sign-on (SSO) is a solution that allows users to authenticate once to

the network and then have access to all applications and resources for which he has been granted per-

mission, without having to enter additional IDs and passwords. SSO is a convenience for users as it

reduces the number of IDs and passwords to remember, and it’s a convenience for system managers

as it greatly simplifies administration. Perhaps one of the most valuable aspects of SSO is that once an

employee leaves the company, all their access can be removed by disabling their SSO ID.

The challenge with SSO is that the business applications may have to be altered to incorporate the

technology. For in-house developed applications, this may be a relatively straightforward change.

However, with third-party applications, it may be much more complex. A host of SSO-ready applica-

tions have sprung up, and standards like OpenID and Security Assertion Markup Language (SAML)

have been developed and adopted to help facilitate SSO.

This technique is a classic case of user convenience versus security trade-off discussed in the

beginning of this chapter. (See the section “Security versus Privacy versus Convenience” on

2198.3 Security solutions and technologies

page 207.) Certainly the fewer things to remember, the happier most users are, but should a hacker gain access to an SSO ID, they then have access to all the systems the user is authorized for.

Identity Management Identity management encompasses a variety of solutions and technologies related to user authentica-

tion. These include:

• Single sign-on. This option is discussed in the previous section on page 219. • Self-service. Allowing users to reset their own passwords. • Password synchronization. When a user changes a password in one system, the new password is

automatically replicated to other applications and systems. • Account provisioning. The process of creating new accounts and revoking them when they’re no

longer needed.

• Federated identity. This is a single-user ID that can be used for different websites because they all belong to a common “federation.” While similar to SSO, federated identities are useful when trying

to manage authentication to external, in addition to internal, sites and applications. This allows or-

ganizations to share user credentials across the network boundaries that normally separate them.

Other User Authentication Methods New methods of confirming a user is who he or she claims are being created all the time. In addition to

the tried and true but sometimes fallible passwords, more advanced techniques include fingerprint and

retinal scanning; and speech, signature, and face recognition. Another method gaining in popularity is

referred to as “knowledge-based access"; this system is based on what information the user knows.

Unlike passwords and other mechanisms, this information is not prone to being forgotten or lost. With

knowledge-based access, users will provide the system with answers to various questions (e.g., favorite

pet’s name, mother’s maiden name, place of birth, first school attended, favorite sports team). Many

websites use knowledge-based access for password recovery.

Security Defenses There is an entire industry selling security solutions—hardware, software, utilities, processes, and so

on. The following are some of the more common solutions being implemented, but note that this list is

certainly not comprehensive.

Firewalls Firewalls are used to control access between networks. While firewalls initially existed just in corpo-

rate networks, they are now used on individual devices, and Microsoft Windows itself has a built-in

firewall. While used mostly to protect your internal network from the public Internet, firewalls are

often also used between private networks. For example, you may have a connection with a vendor

or subsidiary and use a firewall to ensure that their access to your network is restricted. Firewalls

are configured with rules to specify which devices can connect to each other, using which protocols

and ports, and sometimes even specifying the times that the connectivity is allowed.

Intrusion Detection and Prevention Intrusion Prevention Systems (IPS) and Intrusion Detection Systems (IDS) offer a layer of protection in

addition to firewalls against the exposures of the Internet.

220 CHAPTER 8 Security and Compliance

• An Intrusion Detection System identifies suspicious traffic based on patterns of activity. Similar to the way antivirus software works, an IDS compares traffic patterns against various knownmalicious

signatures (which are updated frequently). Essentially the IDS is evaluating traffic to see if it

matches known attacks. When it detects suspicious activity, the IDS system will alert the network

administrator. • An Intrusion Prevention System takes an IDS a step further. Not only does it detect the malicious

activity but it takes action (in addition to notifying the administrator). The IPS may drop a packet

from the suspicious traffic, close a port automatically, or refuse further traffic from that particular

IP address. In the millisecond world of network activity, a network administrator may not be

able to react fast enough to a notification from an IDS about a possible attack. An IPS can take

preventive action (based on how it’s set up and configured) instantly after it detects any suspicious

activity.

Malware Prevention Antivirus software has long been a cornerstone of protecting the IT environment. Antivirus solutions

are available for workstations, servers, e-mail gateways, and even handhelds. By downloading the lat-

est pattern and signature files regularly (see the section “Ongoing Maintenance” on page 221, later in this chapter), an organization can protect itself against the latest release and developments of viruses.

Many organizations will employ virus solutions from multiple vendors as a way of strengthening their

defenses further.

Antispyware solutions operate very similarly to antivirus solutions, with signature and pattern

files that have to be updated regularly. However, many antivirus solutions now include antispyware

functionality as well.

Antispam solutions for your e-mail gateway can do more than just reduce the amount of nuisance

e-mail. These solutions can provide protection by preventing e-mails that include security risks, such

as phishing attempts, worms, and viruses. Malware prevention solutions can prevent third-party

tracking of user activity, as well as stopping unnecessary slowdowns in individual systems and servers.

Ongoing Maintenance In addition to access reviews, as mentioned earlier, there are activities that should be performed

regularly by security administrators to identify and minimize risks.

Log, Account, and Access Review As stated earlier, IDs that haven’t been used for a predefined period of time should be disabled or

deleted. Many systems can report when unsuccessful login attempts have been made; these logs should

be reviewed and investigated. System logs should be reviewed for those events and incidents that could

identify security threats.

Accounts that have special privileges should be reviewed a few times a year to confirm that the need

for the special privilege is still valid and justified.

After discussion with other departments (e.g., Legal, Audit), shared areas of the network (places

where multiple users have read and write access) may be regularly purged of files that haven’t been

accessed in a while. (Not only does this free up space, but it might also remove files with confidential

information that users placed there by mistake or are no longer needed.)

2218.3 Security solutions and technologies

Software Patches and Updates Security administrators should check with their software vendors regularly to obtain and apply any

updates or patches that close security holes. Processes should exist for checking the environment reg-

ularly to make sure that systems are current and for ensuring that unpatched and unprotected systems

can’t connect to the corporate network.

Following Microsoft’s lead, many vendors now have a set schedule for releasing patches. This

allows IT departments to set schedules for testing the patches and implementations to the production

environment.

Pattern files updates (for antivirus, antispam, intrusion prevention/detection) are usually released on

a much more frequent basis than software security patches. It’s common for these files to be updated

several times a day, or more. Because of the frequency of these updates, these systems have to be set to

regularly download and install the updates as they are released.

IT Managers can use various tools and configuration options to manage the distribution of updates

to servers and workstations. These allow the IT department to determine if updates should be automat-

ically installed (an increasingly popular and recommended method) or only after they’ve been tested

and validated by the IT department. Similarly, the tools can help you see which devices have the most

current updates and which are behind.

Encryption, Keys, and Certificates Encrypting data is one of the most effective methods for keeping data secure (especially if combined

with other security practices). Among the most popular solutions for using encryption are:

• Public Key Infrastructure (PKI) • Digital certificates

• VPN tunneling

• Secure Sockets Layer (SSL)

• Pretty Good Privacy (PGP)

• Encryption standards like AES

• E-mail encryption • Disk and tape storage encryption

Reports of security breaches due to lost backup and to missing or stolen laptops have become almost

commonplace. (The website www.privacyrights.org/data-breach maintains an ongoing list.) As such, many organizations are now implementing encryption as a way to limit their exposure when data

are lost. Encryption of any sort of mobile media is growing dramatically—this includes tapes, laptops,

USB drives, and handheld devices. Careful testing must be done before implementing encryption

solutions to see how/if it impacts users, operations, and applications.

Network Access Control In a typical IT environment, when users are prompted for IDs and passwords by an application, they are

already on your network. So even if they can’t get into the application, they already have access to your

very sensitive network. Network Access Control (NAC) is a technology solution that controls who gets

access to your network. In short, the user/device can’t access any part of your environment until the

NAC confirms that it should. Some NAC tools, as well as some remote access solutions like VPN prod-

ucts, allow you to set policies such as requiring that devices must have current OS patches, and must be

running current anti-virus software before being allowed to connect to the network.

222 CHAPTER 8 Security and Compliance

Staffing Becausemanyof the IT staff haveelevatedaccessprivileges, it’s important tomakesure that the staffmem-

bers themselves aren’t security risks.Manycompanies and organizations dobackgroundcheckson ITstaff

membersand includespecific requirements, accountabilities, and responsibilities related tosecurity in their

job descriptions. Consider familiarizing your staff with various security standards and certifications:

• CISSP Certified Information Systems Security Professional (CISSP) is a certification for profes-

sionals in the computer security field responsible for developing information security policies, stan-

dards, and procedures and managing their implementation across an organization. Other security

certifications include SSCP (Systems Security Certified Practitioner), CAP (Certified Authoriza-

tion Professional), and CSSLP (Certified Secure Software Lifecycle Professional).

• ISO 17799 is an internationally recognized information security standard that establishes guidelines

and general principles for initiating, implementing, maintaining, and improving information secu-

rity management in an organization. • ISO 270001 is the international information security standard against which organizations can seek

independent certification of their Information Security Management Systems.

Additional information about security standards appears in the section “Methodologies and Frameworks” on page 238 of this chapter.

Security Incident Response You should establish procedures for dealing and responding to security breaches. Of course, the type of

breach may dictate different types of responses. For example, a rampant virus is going to require a

different level of response and urgency than discovering that some phishing e-mails made it past your

anti-spam solution.

Many organizations create a formal Security Incidence Response Team (SIRT) to respond to se-

curity breaches. A SIRT can be composed of individuals from all areas of the organization and are

often on 24-hour call. They are responsible for protecting an organization’s critical IT assets.

Depending on the circumstances, the situation may call for:

• Examining log files and alerts.

• Contacting your vendors for assistance in identifying the problem and then determining how to

address it. • Shutting down certain resources, services, and network components until the problem has been

identified and resolved.

• Notifying senior management and the user community. In a heavily regulated industry (such as

banking) you may need to involve Legal and HR as well.

• Changing all passwords.

• Notifying law enforcement.

• Performing a security audit.

In all cases, every incident should be documented in a postmortem report. Such a postmortem will usu-

ally contain:

• A chronology of events, including actions taken, from first sign of the problem to resolution

• Identification of what procedures, tools, resources, and so on worked well

• Identification of what items did and didn’t work as expected

2238.3 Security solutions and technologies

• An analysis of the root cause of the problem

• A plan to address and correct the problems and issues identified as a result of this incident

Asummaryof thepostmortem,without toomuch IT jargon, is oftenprovided tomanagement.This summary

isusuallywelcomedbyuppermanagement, as it documents thehowandwhyofwhathappenedandanaction

plan to ensure that a similar event doesn’t occur again.Apostmortemdocument canbe aneffective summary

for senior management, which demonstrates that IT security is taken very seriously by your team.

8.4 TYPES OF THREATS The range of possible threats to your business and your information is very, very large. And it changes

daily. The most important point about understanding different types of threats is to know that you must

constantly stay on top of them. You must have the latest patches, and you must upgrade the operating

systems to the latest versions. You don’t need to become a guru, but you must either stay up to date or

task others with doing this.

Malware Malware is a category name to define software that causes problems. This can include viruses, adware,

and spyware. Malware can degrade system performance, expose confidential information, distribute

spam, etc. Specific types of malware include:

• Macro viruses. Viruses that use commands (macros) in application files (e.g., Excel and Word) to replicate themselves and do damage.

• Worms. Self-contained programs that replicate themselves usually via the network or e-mail attachments.

• Adware. Software that installs itself on a workstation for the purpose of displaying ads to the user. Users often unknowingly install adware when they download applications from the Web.

• Spyware. Software that monitors a user’s activity, often to collect account numbers, passwords, etc. Spyware often works in tandemwith adware as the ads shownmay be related to the activity detected

by the spyware. Like adware, spyware is also frequently installed by the user unknowingly when

downloading applications from the Web.

• Trojan horses. Programs that appear to be legitimate, but in fact are malicious. • Backdoor Trojans: Trojan horse programs that allow a hacker to control your computer remotely. • PageHijackers:Akin to thepurposesof adware, theycovertly redirect browsers to specificwebpages. • Rootkits:A set of modifications to the operating system that is designed primarily to hide malicious

activity. Because the rootkit software essentially resides in a modification of the operating system,

it’s extremely difficult to detect, and it also continually checks on itself to see that the compromised

files are still compromised and reinfects as needed. In addition to being very difficult to detect,

they’re equally hard to remove.

• Key loggers: Small applications that reside on a computer to record key strokes. These are used to capture passwords and confidential information (e.g., credit card numbers).

Of particular concern with malware is what is known as a Zero-Day attack, which is malicious code that

takes advantage of a security vulnerability before there’s a fix for it. In some cases, the malicious code

is released even before there is public knowledge of the vulnerability.

224 CHAPTER 8 Security and Compliance

Phishing and Social Engineering Phishing is the process of trying to obtain confidential information (credit card numbers, passwords,

social security numbers, bank account numbers, etc.) by fraudulent means. The perpetrator sends out e-

mail messages that appear to come from well-known companies and websites. The e-mails will mimic

the legitimate company’s logos, text style, etc. Typically, the e-mail tells users that there’s some prob-

lem with their account and that they need to log in to confirm or verify some information. The e-mail

contains links to sites that can appear virtually identical to the site it claims to be. If successful, the user

will click the link and be fooled into entering the information.

Websites that are frequently spoofed by phishers include PayPal, eBay, MSN, Yahoo, BestBuy, and

nationwide banks (although the practice has now filtered down to local companies too). When phishing

is successful, not only will it result in financial loss for the victim, but it could also result in identity

theft. The U.S. government has developed a site, www.onguardonline.com, to help educate individ- uals about protecting themselves from Internet fraud.

From a technical perspective, phishing relies on spoofing e-mail. From the human perspective,

phishing also relies on “social engineering.” Social engineering is the practice of trying to get infor-

mation from people by lying to them. Social engineering relies on the natural tendency of people to

trust, to follow instructions, and to want to help. From this perspective, the adage about users being

the weakest link of computer security is certainly true. Typical social engineering tricks include pre-

tending to be an IT administrator and contacting users to verify their account or password. While

pretending to be from IT is popular, so is IT as the victim. In the reverse situation, the phisher might

call the Help Desk and complain that he’s having difficulty logging in. By counting on the Help Desk to

provide “help” (including instructions, password resets, etc.), the phisher may be able to gain access

to the system.

SOME SECURITY STORIES

Grand Theft “(CNN) – A hacker has obtained the personal information of PlayStation Network account holders and sub- scribers of the Qriocity streaming service, Sony said in a message to customers . . . The attack also has crippled Sony’s PlayStation Network, which has some 70 million subscribers . . .” (www.cnn.com/2011/TECH/gaming .gadgets/04/26/playstation.network.hack/).

A Tiny Clue Leads to Giant Flaw “What first appears as a 75-cent accounting error in a computer log is eventually revealed to be a ring of industrial espionage . . . Clifford Stoll [Lawrence Livermore lab scientist] becomes, almost unwillingly, a one-man security force trying to track down faceless criminals who’ve invaded the university computer lab he stewards” (www.amazon.com/gp/product/0671726889/002-0037032-5296037?v¼glance&n¼283155).

A Classic (and Unfortunate for the Victim) Story of the Damage Lack of Understanding Can Cause KevinMitnick is a famous hacker, one of the first to hone his social engineering skills to break into and acquire all kinds of technical information (including code from Nokia and Motorola). After he was arrested, he had the guards so spooked at his federal penitentiary that they put him in solitary confinement for eight months because they were convinced he could launch nuclear missiles by whistling into a phone (www.cnn.com/2005/ TECH/internet/10/07/kevin.mitnick.cnna).

2258.4 Types of threats

8.5 COMPLIANCE AND IT Certainly one of the biggest changes to affect the IT industry over the past few years has been the con-

cern for compliance of a variety of regulations and legislation. Spurred by events such as the financial

scandals of Enron, WorldCom, Bernie Madoff, HealthSouth, Adelphia, Tyco, Qwest Communications,

and Global Crossing (to name a few), along with the financial sector meltdown of 2008 and 2009, at-

tention has been drawn to the integrity of financial reporting and controls. In these cases, senior man-

agement was allegedly aware of events and activities that led to the misstatement of the financials and

the deception of investors.

Following this series of scandals, there was renewed interest in ensuring that sufficient controls

were in place to make sure that this couldn’t happen again. The most well-known legislation is the

Sarbanes–Oxley Act of 2002, which was passed by the U.S. Congress and is discussed later in this

chapter on page 227. Of course, while Sarbanes–Oxley is the best known, it isn’t, by far, the only set of regulations that makes sure that data, financials, etc. are being handled properly.

“Compliance” is a broad term that can carry a lot of meanings. Is the entrance to your building ADA

(Americans with Disabilities Act)-compliant? Was your television compliant for the digital TV (DTV)

conversion of 2009? Is your health care provider HIPAA-compliant?

Overview The following section, “The Rules,” presents some important compliancy regulations. You may have heard of some of these and are wondering if they pertain to your group or company. The goal is to

provide you with a brief overview of the rule or regulation; you can then either pursue further infor-

mation or decide the issue does not pertain to your situation.

For example, the HIPAA privacy provision took effect in 2003, but the security provision of HIPAA didn’t take effect until 2005. You may have been working for a health care provider and heard

the term “HIPAA compliant” for years but not understood what that meant. For ITers, the biggest im-

pact of the rules and regulations of compliance generally relates to controlling, securing, and managing

data. This is no small issue: Making data flow from one place to another is easy (sometimes too easy),

but making it flow only to certain places and not to others (and to be certain of that) is much harder. In 2006, the FTC imposed a $10 million fine on ChoicePoint for failing to comply with the data protection

obligations of the Fair Credit Report Act when a security breach resulted in the potential exposure of

financial records for over 100,000 individuals.

Personally Identifiable Information (PII) Many of the compliance regulations presented in the following section “The Rules” have specific ref- erences to individuals’ personal data. Within the industry, this is referred to as Personally Identifiable

Information (PII) and essentially refers to any data that can be used (either alone or with other data and

sources) to identify a person. The definitions of PII vary among regulations and countries, but often

include fields like:

• Name

• Government ID number (e.g., Social Security number)

• Driver’s license and other identification numbers

• Birth date, place of birth

226 CHAPTER 8 Security and Compliance

• Personal telephone numbers

• Personal e-mail address

• Home address

• Mother’s maiden name • Financial information, medical information, disability information • Credit card and account numbers

It is this PII data that often gets the most attention and protection in laws and regulations, and that IT,

businesses, and organizations will take extra steps with (e.g., policies, guidelines, security solutions,

etc.) to ensure compliance.

Victims of Non-Compliance There is a perception that the victims of non-compliance are the employees of the companies them-

selves. And that is true: Global Crossing’s excesses affected 10,000 employees and WorldCom’s

12,800. Many people lost their entire 401k savings in addition to their jobs.

However, many more people are affected by corporate perfidy than is generally understood. In

HealthSouth’s case, not only did the company’s employees suffer, it radically affected the financial

well-being of its hometown, Birmingham, Alabama. When corporate scandals took their toll on com-

panies based in New York, the state suffered a $1 billion reduction in tax revenues (www.osc.state.ny .us/press/releases/aug03/082003.htm). The questionable practices that led to the economic crisis of 2008/2009 was felt across the country and across the globe in soaring statistics related to record un-

employment, a huge number of foreclosures, and wiped-out retirement nest eggs.

The situation can easily snowball well beyond a single company or state. Depending on the type and

scope of the circumstances, incidents of non-compliance (such as data breaches or lack of financial

reporting integrity) can impact a company’s employees, customers, suppliers, and partners; in some

cases it may have an impact on the financial markets as a whole. Non-compliance can lead to media

attention; lack of trust by employees, customers, suppliers, and partners; individual and organizational

financial loss; and, in some cases, bankruptcy. Eroding consumer confidence leads to reduced spend-

ing, which further impacts other individuals and businesses, and causes the economy to shrink.

8.6 THE RULES The sections that follow aren’t meant to be comprehensive, but they do represent some of the more

impactful guidelines under which many organizations and IT departments have to operate. This section

isn’t intended to be a how-to guide for ensuring compliance, but to make the new IT manager aware of

the various issues and their importance.

Sarbanes–Oxley Named for its two sponsors, Senator Paul S. Sarbanes (D-Maryland) and Representative Michael G.

Oxley (R-Ohio), and frequently called by a variety of nicknames (Sarbanes, SOX, Sarb-Ox), it’s

formally called the Public Company Accounting Reform and Investor Protection Act of 2002 and

is considered to be the most significant change to U.S. Securities Law since the 1930s.

2278.6 The rules

The primary objective of SOX is to ensure the integrity of financial statements. It’s interesting to note

that SOX doesn’t regulate information technology directly, but because IT systems are usually at the core

of how a companymanages and reports its finances, it is no surprise that IT is significantly impacted by it.

Although less than 200 words long, Section 404 of Sarbanes–Oxley has the most impact on IT. Of

particular note is the requirement for companies to annually (1) state the responsibility of management

for establishing and maintaining an adequate internal control structure and procedures for financial

reporting and (2) contain an assessment, as of the end of the most recent fiscal year of the issuer,

of the effectiveness of the internal control structure and procedures of the issuer for financial reporting.

In addition, Section 404 requires the auditors to “attest to, and report on, the assessment made by

the management.”

Those few lines of requirementshavehadanenormous trickle-downeffect throughout companies,with

a great deal of it being felt in IT. In fact, SOX has placed such an enormous burden that a study and survey

by the Security and Exchange Commission (www.sec.gov/news/studies/2009/sox-404_study.pdf) released in 2009 showed that:

• The SEC’s survey shows the long-term burden on small companies is more than seven times that

imposed on large firms relative to their assets. • Section 404 compliance exceeds $2.3 million each year in direct costs at the average company. • Among companies of all sizes, only 19 percent say that the benefits of Section 404 outweigh the costs.

• More respondents say that it has reduced theefficiencyof their operations thansay it has improved them.

• More say that Section 404 has negatively affected the timeliness of their financial reporting than say

it has enhanced it.

In the years since its passage, the regulations have received quite a bit of criticism with reference to

increased costs but not delivering the intended results. While some notable names have called for its

repeal, the rules still stand and should be taken seriously. Misstatement of financials under Sarbanes–

Oxley can lead to jail time, fines, or both for executives.

Many other countries have their own legislation that is comparable to Sarbanes–Oxley. These

include Ontario Canada’s Bill 198, Japan’s Financial Instruments and Exchange Law, Germany’s

Corporate Governance Code, Australia’s CLERP9, Financial Security Law of France, L262/2005 of

Italy and India’s Clause 49.

Health Insurance Portability and Accountability Act (HIPAA) HIPAA has regulations promoting the privacy and security of medical records. These regulations are

related primarily to the health care industry. HIPAA’s regulations directly cover three basic groups of

individual or corporate entities:

• Health plans (e.g., public and private insurance carriers, employee medical plans)

• Health care providers (e.g., doctors, hospitals, or any provider of health or medical services)

• Health care clearinghouses (e.g., processors of health information, such as billing services)

While HIPAA primarily impacts those in the medical industry, it can indirectly impact organizations

outside of the field. For example, nonmedical companies would need to make sure that the process of

dealing with and administering employee medical benefits complies with the act.

228 CHAPTER 8 Security and Compliance

The Security Rule of HIPAA is designed to assure the confidentiality and integrity of Protected

Health Information (PHI). Protected Health Information under HIPAA includes any individually-

identifiable health information (IIHI). This refers not only to data explicitly linked to a particular

individual, but also includes health information with data items that reasonably could be expected

to allow individual identification.

The Privacy Rule of HIPAA is intended to protect the privacy of all IIHI in the custody of covered

entities, regardless of whether the information is or has been in electronic form.

Associated with HIPAA is the Health Information Technology for Economic and Clinical Health

(HITECH) Act, which promotes the use of information technology in the health industry. Provisions of

the HITECH act address the privacy and security concerns associated with the electronic transmission

of health information, in part, through several provisions that strengthen the civil and criminal enforce-

ment of the HIPAA rules.

Basel II Basel II is an updated version of the Basel Accord that was adopted in 1988 in Basel, Switzerland. Basel

II, formally known as the International Convergence of Capital Measurement and Capital Standards,

was endorsed in 2004 by the central bank governors and the heads of bank supervisory authorities in the

Group of Ten (G10). G10 refers to the 10-member countries of the International Monetary Fund

(United States, United Kingdom, Germany, France, Belgium, The Netherlands, Italy, Sweden, Canada,

and Japan) plus Switzerland.

The Basel II framework sets out the details for adopting more risk-sensitive minimum capital re-

quirements for banking organizations. The new framework reinforces these risk-sensitive requirements

by laying out principles for banks to assess the adequacy of their capital to ensure that banks have suf-

ficient capital to support the risks that they undertake. Like Sarbanes–Oxley, it also seeks to strengthen

the transparency and integrity of banks’ financial reporting.

The Basel II Accord is built around “three pillars”:

• Pillar 1 of the new capital framework revises the 1988 Accord’s guidelines by aligning the mini-

mum capital requirements more closely to each bank’s actual risk of economic loss.

• Pillar 2 of the new capital framework recognizes the necessity of exercising effective supervisory

review of banks’ internal assessments of their overall risks to ensure that bank management is

exercising sound judgment and has set aside adequate capital for these risks. • Pillar 3 leverages the ability of market discipline to motivate prudent management by enhancing the

degree of transparency in banks’ public reporting. It sets out the public disclosures that banks must

make that lend greater insight into the adequacy of their capitalization (Bank of International Set-

tlements, www.bis.org).

In the United States, adoption and implementation of Basel II are managed by the four Federal banking

agencies (the Office of the Comptroller of the Currency, the Board of Governors of the Federal Reserve

System, the Federal Deposit Insurance Corporation, and the Office of Thrift Supervision). In 2007,

these agencies issued final rulings about adoption of Basel II for the largest banks in the United States

(others may opt-in). The implementation process, which includes parallel and transition periods, won’t

have any bank fully subject to the rule until 2012 at the earliest.

2298.6 The rules

Basel III, which the United States expects to adopt beginning in 2013, primarily strengthens bank

capital requirements and introduces new regulatory requirements on bank liquidity and bank leverage,

and provides for an enhanced supervisory review process, and disclosures.

SB-1386 California’s Security Breach Information Act (SB-1386) is a state law requiring organizations that

maintain personal information about individuals to inform those individuals if the security of their in-

formation is compromised. This act stipulates that if there’s a security breach of a database containing

personal data, the responsible organization must notify each individual for whom it maintained infor-

mation. The act, which went into effect July 1, 2003, was created to help stem the increasing incidences

of identity theft. Essentially, it requires an agency, person, or business that conducts business in

California and owns or licenses computerized “personal identifying information” to disclose any

breach of security to any resident whose unencrypted data are believed to have been disclosed.

SB-1386 defines Personal Identifying Information (PII) as an individual’s unencrypted first and last

name in conjunction with at least one other piece of information, such as:

• Social Security number • Debit or credit card number • Driver’s license number or California ID card number

• Account number in conjunction with a PIN or access code

PII data is referenced in many different regulations and laws around the globe. However, each may

define PII differently. Because of the reference to unencrypted data, many organizations have taken

to encrypting data that leave their custody. Interestingly enough, the California law doesn’t set any

minimum requirements or make any statement about the strength of the encryption.

Although it’s a California state law, it doesn’t mean that companies located outside of California are

exempt. If your company does business anywhere in California, you are affected. Since California has

the largest population of any state, it’s highly likely that SB-1386 has an impact on your business.

When data are compromised, SB-1386 outlines specific courses of action that an affected company

must follow.

Massachusetts Data Protection Law The Massachusetts Data Protection & Privacy law went into effect on March 1, 2010 and applies to

anyone that processes, stores, or maintains data associated with a Massachusetts resident.

The law requires that companies have a written information security program (WISP), which

would:

• Designate employees responsible for the program • Create an inventory of personal information • Assess the risk of a breach

• Have disciplinary measures for failure to comply

• Provide for training of employees

• Define how the WISP is to be monitored

230 CHAPTER 8 Security and Compliance

The law covers both paper and electronic records, and says that access must be restricted and that the

data must be safeguarded. For paper records, this would include locked cabinets and storage rooms, for

example. For electronic files this would include appropriate user authentication protocols, encryption

of transmitted files and portable devices (e.g., USBs, laptops), firewalls, anti-malware solutions,

operating system patching, among others.

With fines up to $5,000 per compromised record, the Massachusetts law is considered one of the

strictest in the nation.

Fair and Accurate Credit Transactions Act (FACTA) The FACTA is a consumer rights bill that became fully effective June 1, 2005, and is an extension of the

Fair Credit Reporting Act (FCRA). The rule says that in regard to consumer information (such as name,

Social Security number, address) you must “take reasonable measures to protect against unauthorized

access or use of the information.” FACTA is designed to cut down on the incidences of identity theft as

a result of valuable consumer information contained in business records. FACTA also discusses de-

struction methods, such as shredding of paper documents and destroying/erasing electronic media.

FACTA also includes the “red-flag rule” to have systems in place to identify activity that may indicate

attempts at fraud and possible identity theft.

Although you might think that this act only applies to organizations such as credit bureaus, banks,

and retailers, its reach is actually far greater. You could easily have FACTA-covered data if you’ve

done background checks on your employees and job applicants.

Gramm–Leach–Bliley The Financial Modernization Act of 1999, also known as the Gramm–Leach–Bliley Act (named for its

Republican Party sponsors Phil Gramm, Jim Leach, and Thomas Bliley), or GLBAct, has provisions to

protect consumers’ personal financial information held by financial institutions. The act is enforced by

multiple federal agencies as well as states. It affects not only banks, insurance companies, and security

firms, but also brokers, lenders, tax preparers, and real estate settlement companies, among others.

The GLB Act consists of three sections:

• The Financial Privacy Rule, which regulates the collection and disclosure of private financial

information. • The Safeguards Rule, which stipulates that financial institutions must implement security programs

to protect such information.

• The Pretexting provisions, which prohibit the practice of pretexting (accessing private information

using false pretenses).

For IT, it’s important to note that the act provides each agency or authority described in Section 6805(a)

of this act to establish appropriate standards for the financial institutions subject to their jurisdiction

relating to administrative, technical, and physical safeguards:

1. To ensure the security and confidentiality of customer records and information. 2. To protect against any anticipated threats or hazards to the security or integrity of such records. 3. To protect against unauthorized access to or use of such records or information that could result in

substantial harm or inconvenience to any customer.

2318.6 The rules

GLB also requires the safeguarding of “nonpublic personal information,” which includes nonpublic

“personally identifiable financial information,” such as any information (1) a consumer provides to

obtain a financial product or service and (2) about a consumer resulting from any transaction involving

a financial product or service otherwise obtained about a consumer in connection with providing a

financial product or service (www.ftc.gov/privacy/glbact/glboutline.pdf). The act also requires financial institutions to give customers written privacy notices that explain

their information-sharing practices. In 2008 and 2009, GLB received criticism as a contributing factor

in the subprimemortgage crisis, as GLB repealed the Glass–Steagall Act of the 1933s, thereby allowing

banks, securities companies, and insurance companies to compete with one another directly and lead-

ing to the creation of financial conglomerates such as Citigroup.

U.S. Securities • Rule 342 of the New York Stock Exchange (NYSE) states that member organizations shall have

“internal supervision and control of the organization and compliance with securities’ laws and

regulations.” The rule also provides that member organizations have “reasonable procedures for

review of registered representatives’ communications with the public.”

• Rule 440 of the NYSE requires that “every member organization shall make and preserve books and records as the Exchange may prescribe and as prescribed by [SEC] Rule 17a-3. The record

keeping format, medium, and retention period shall comply with Rule 17a-4 under the Securities

Exchange Act of 1934.” • Rule 17a-3 of the Securities and Exchange Act of 1934 defines the requirement to keep various

types of records. • Rule 17a-4 of the Securities and Exchange Act of 1934 provides that “broker and dealer shall

preserve for a period of not less than 3 years, the first two years in an accessible place . . . originals of all communications received and copies of all communications sent by such member, broker, or

dealer (including interoffice memoranda and communications) relating to his business as such.”

• Rule 3010 of the National Association of Securities Dealers (NASD) requires that member firms establish and maintain a system to “supervise” the activities of each registered representative, in-

cluding transactions and correspondence (which includes e-mail) with the public. In addition,

NASD 3110 requires that member firms implement a retention program for all correspondence in-

volving registered representatives.

Patriot Act The USA Patriot Act (formally called Uniting and Strengthening America by Providing Appropriate

Tools Required to Intercept and Obstruct Terrorism Act of 2001) was passed in the wake of the terrorist

attacks of September 11, 2001. While the act provides primarily for giving greater latitude to the U.S.

government, it does have its impact on the private sector.

The act has a number of requirements for financial institutions in regard to verifying customers’

identities and determining whether the customer appears on any list of known or suspected terrorists

or terrorist organizations (thomas.loc.gov/cgi-bin/bdquery/z?d107:h.r.03162:). The act has been quite

controversial, particularly as it relates to issues of civil rights and privacy. The act’s provisions have

been amended over the years.

232 CHAPTER 8 Security and Compliance

Dodd–Frank Act This bill was passed in direct response to the massive financial collapse that occurred in 2008 and

2009. It more stringently regulates the U.S. financial system with the goal of preventing another

meltdown. The Act created a host of new agencies (while merging and removing others) with a goal

of streamlining the regulatory structure, and increasing oversight of specific institutions regarded as a

significant risk. The Act establishes rigorous standards and supervision to protect the economy and

American consumers, investors, and businesses, and eliminates the loopholes that led to the economic

recession.

Office of Foreign Assets Control (OFAC) OFAC is part of the U.S. Department of Treasury and administers and enforces economic sanction

programs primarily against countries and groups of individuals, such as terrorists and narcotics traf-

fickers. OFAC regulations prohibit individuals and businesses from transacting business with specific

individuals, organizations, and countries. Compliance with OFAC regulations requires checking the

names of customers against the OFAC list.

CLERP-9 (Australia) The Australian Corporate Law Economic Reform Program (Audit Reform and Corporate Disclosure)

Act 2004 (more commonly known as CLERP-9) came into effect on July 1, 2004, and is designed to

restore confidence in the market after a number of high-profile corporate collapses.

CLERP-9 is a substantial piece of legislation that in many ways is comparable to the Sarbanes–

Oxley legislation in that it includes reforms relating to:

• Disclosure of directors’ remuneration

• Financial reporting

• Auditors independence

• Continuous disclosure

• Enhanced penalty provisions

Also, like SOX, misstatement of financials under CLERP can lead to jail time, fines, or both for

executives.

Personal Information Protection and Electronic Documents Act (PIPEDA) PIPEDA is a Canadian law that regulates the collection, use, and disclosure of personally identifiable

information.

Under PIPEDA, information has to be collected with the individual’s consent (and only for reason-

able purposes), used only for the purpose for which it was collected, properly safeguarded, and avail-

able for inspection and correction. Organizations, including corporations, individuals, and associations,

are generally subject to the privacy requirements of PIPEDA if they collect, use, or disclose personal

information in the course of a commercial activity.

2338.6 The rules

Privacy and Electronic Communications Directive (European Union) The European Union’s Directive 2002/58 covers many aspects of electronic communications. Some of

the significant provisions that focus on the security of data and networks and guaranteeing the privacy

of communications cover:

• Security of networks and services

• Confidentiality of communications

• Spyware and cookies • Traffic data (information about a person’s electronic activities, such as websites visited) • Location data (data that identify individuals’ whereabouts) • Public directories

• Unsolicited commercial communication (i.e., spam)

• Caller ID

• Nuisance calls

• Emergency calls

• Automatic call forwarding

This directive was amended by Directive 2009/136, sometimes called the “Cookie Directive,” since it

included a number of changes, particularly regarding prior consent to allow for cookies to be placed on

workstations when navigation the Web.

Data Protection Directive (European Union) The European Union’s Directive 95/46/EC is a component of the EU’s human rights and privacy laws

and for the protecting of individuals’ personal data. The directive has three major principles:

• Transparency. The individual has the right to be informed when his personal data are being pro- cessed, by who, the intended purpose, and the recipients of data. The transparency principle ensures

that data may not be processed without the individual’s consent.

• Legitimate purpose. Personal data can only be processed for specified explicit and legitimate purposes.

• Proportionality. The processing of data must be in proportion and related to which it is needed. This essentially defines issues of accuracy, retention, etc.

8.7 HOW TO COMPLY WITH THE RULES The previous pages only touched the surface of some of the rules and regulations that exist for corpo-

rations in general, and IT in particular. There are many more, and if you’re in a heavily regulated in-

dustry (e.g., health care, pharmaceuticals, financials) there are yet other layers to deal with.

Obviously, it’s beyond the scope of this book to provide step-by-step guidance for ensuring com-

pliance. In fact, even among the experts there is considerable debate as to what are the best ways to

address the requirements. When regulations are replete with words such as “adequate,” “sufficient,”

and “reasonable,” they’re clearly open to some interpretation.

234 CHAPTER 8 Security and Compliance

However, there are some common practices that can help get you where you need to be:

• Document the policies

• Identify control mechanisms

• Educate your employees

• Maintain evidence

Each practice is discussed in more detail in the sections in this chapter.

It can also be difficult to know when “enough is enough.” When it comes to security and controls,

there’s always more that can be done. Also, sometimes it’s easy to lose sight of the fact that the reg-

ulations are usually focused on specific areas. For example, Sarbanes–Oxley is focused on the integrity

of financial reporting. Yet, in many organizations it’s often used as the impetus for change in things that

have only the remotest relationship to financial reporting.

Document the Policies Unfortunately for all those ITers who hate writing, documentation is becoming more and more a fact-

of-life requirement in IT. Happily, many of the IT policies required for compliance are often rather

short. As the heading to this section implies, your focus should be on stating the policies, not writing

how-to-manuals.

For example, a backup policy could address items such as:

• How often backup is run

• What types of backup are executed (e.g., full, incremental, differential)

• What is being backed up (e.g., servers, databases, e-mail, workstations, remote sites)

• What process is employed to ensure that the backup tapes were created successfully

• What tools are used (e.g., backup software, tape library, tape-drive format)

• What happens to the tapes after backup is complete (e.g., sent to off-site storage facility) • Any encryption that is used • How long the backup tapes are retained before being recycled or destroyed • What records are kept (e.g., logs from the backup software)

A document like this might just be a few pages long but it can turn out to be very valuable. Before

publishing the document, get as much input and comment as possible. Often that input and comment

will only be from other ITers. In other cases, you may want to review with Legal or HR.

There are some key items that every policy document should have:

• Date it was published • Name(s) of the author(s) and approver(s) • Some sort of revision and review history

As a general rule, it’s a good idea to review all policies at least once a year. Even if there aren’t any

changes, you’re at least showing your auditors that it’s checked and updated periodically as needed.

Finally, the policy should be publicly available to everyone who needs to know. An intranet site is

an ideal location for this document to be stored.

2358.7 How to comply with the rules

Identify Control Mechanisms Too often, policies are created and then universally ignored. With compliance, you want to have pro-

cesses to confirm that the defined policies and procedures are actually used. A control mechanism

provides the appropriate checks and balances.

For example:

• If your policy defines that only duly authorized individuals are allowed to have access to the data

center, you could review the access-card logs to the data center periodically to see if any unauthor-

ized individuals have entered. • Similarly, in the backup policy example given earlier, a process of reviewing the backup logs reg-

ularly to ensure that that they were executed and completed without errors can serve as a control

mechanism.

• If you have a policy that unused network accounts should be disabled after a defined period, you could

regularly run reports to identify when accounts were last used and whether or not they are disabled.

Not only do the control mechanism(s) help youmake sure that policies are being adhered to but they are

also convenient for your auditors.

Educate Employees With your policies and control mechanisms defined, you want to make sure that everyone is aware of

them. Your department intranet is an ideal place for centralizing the storage of these documents. For

simpler policies it may be sufficient to simply e-mail a link to the documents, not only when they are

first published, but when they are changed, updated, or when reviewed annually.

For more complex policies, it may be warranted to hold meetings or small classes so that the policy

can be discussed, demos conducted, and questions answered. (For a more detailed discussion of this

issue, see the sections “Training Users” on page 213.)

Maintain Evidence Perhaps the most critical item in your compliance regimen is to make sure that you’re keeping evidence

of your activities:

• In the example in this section about access to the computer room, a simple e-mail indicating that the

access logs have been reviewed. • In the example of notifying employees about a new policy, a copy of the e-mail would serve this

need. In the case of the class for more complex policies, a record of who attended the class and the

class outline shows that the class was held.

• In the example about disabling unused accounts, e-mails indicating that the report was run and

reviewed and directing which accounts to disable, and evidence that those accounts were indeed

disabled.

When the auditors come knocking, they’ll be looking to see that you have policies that comply with the

various rules and regulations and that you’re actually following those policies. The steps defined earlier

will put you on the right track.

236 CHAPTER 8 Security and Compliance

8.8 HIDDEN BENEFITS OF COMPLIANCE In terms of effort, compliance is at best a burden and at worst an enormous use of time and resources.

You have employees to manage, a department to run, service levels to meet, systems to keep operating,

and a company to help keep profitable. All these rules can be seen as just more obstacles to be overcome

to accomplish your goal.

Nonetheless, similar to the hidden benefits of disaster recovery in the section “Hidden Benefits of Good Disaster Recovery Planning” in Chapter 9, Disaster Recovery on page 261, compliance activities provide a major hidden benefit: You can do important, but potentially overlooked, portions of your job at the same time. You can comply with regulations while simultaneously getting your “real work” done. The following sections explain how you can pull this off.

The Hidden Benefit of Documentation The first step of compliance, “document the policies,” is a perfect example. Sure, some policies you

need to document are obscure, but most are policies that you want a record of in order to do your job

better. You should have a clearly documented backup policy—not only for compliance reasons and not

only for disaster recovery reasons, but for backup plan efficiency reasons. Also, with documented

policies, it increases the likelihood that everyone is following the same policy.

If you (or one of your employees) have the entire backup plan in your head (or, just as bad, have the

“real” plan as opposed to the written, outdated plan or the plan no one can understand stored in that

manner), the future of your entire company’s data depends on the reliability of one person. Becoming

compliant may wake you up to that scary fact and cause you to do something about it.

The Hidden Benefit of Control Mechanisms The benefit to the second method of compliance, “identify control mechanisms,” is similar to the first.

Your policies shouldn’t be abstract documents in a file somewhere, but living items that positively

affect and reflect your department’s behavior. Your security policies are an excellent example. Regard-

less of the legal requirements, you should bemonitoring your security procedures aggressively. Control

mechanisms will give you (as well as the auditors) the confidence that the policies you worked so hard

to define are indeed being applied.

Depending on the level of security and size of your company, that monitoring can be a daily affair.

There are many companies where even access to other departments is carefully restricted. If your com-

pany isn’t one of these, do you need to become one? And how did you answer that question? Off the top

of your head or by understanding the latest version (not the one put together last year) of your com-

pany’s security policy?

The Hidden Benefit of Educating Your Employees Keeping your employees informed isn’t only a required component of some regulations, but it’s simply

good business practice. It’s much easier for employees to comply with the policies if they know what

they are.

Many employees were hurt by the global accounting and financial scandals. Employees—and that

includes you—as well as investors now want to know much more about what their company is doing.

2378.8 Hidden benefits of compliance

Also, it’s your responsibility, as well as the responsibility of your superiors and colleagues, to provide

that information proactively. Like many problems, if you approach the issue aggressively before it

becomes a problem, you can turn it into an opportunity.

A timely example of keeping employees informed is to let them know the exact financial health of

their company. This information, if you work for a publicly held corporation, is clearly available in

many locations. As a proactive, concerned manager you can provide that data to your employees

and you can provide it in an abbreviated form. Few people want to read the entire 10-K and 10-Q forms,

but most want to read a paragraph or two about the financial health of the company and where to get

more information if they want to do further research. Your Finance department can either provide you

with that data or, more likely, point you to where that data already exist.

If the financial news for your company isn’t good that quarter, you’ll have happier and more

confident employees if you tell them instead of them first hearing it from CNN.

Hidden Benefits of Maintaining Evidence Maintaining evidence might be considered a polite euphemism for the popular CYA acronym. How-

ever, in truth, the evidence proves to anyone who might ask (regulators, Legal, auditors, etc.) that

you’re actually operating by the established policies. Maintaining evidence is essentially good record

keeping and is a good habit for all to have, especially in the business world. Also, record keeping just

might get people in the habit of doing more careful documentation.

8.9 METHODOLOGIES AND FRAMEWORKS In light of all the activity surrounding compliance, you should be aware of a number of methodologies,

frameworks, and processes developed by third parties. Although these weren’t designed specifically for

compliance activities, many organizations have adopted them to help provide increased structure to

monitor and maintain their compliance activities. Oftentimes, these methodologies, processes, and

frameworks are adopted and incorporated into all projects and activities by your organization’s Project

Management Office.

IT Governance IT governance is a framework to help ensure that IT’s strategies are aligned with those of the business,

that they are delivering value and addressing stakeholder’s needs, etc. A proper framework for IT gov-

ernance can identify how IT is functioning overall and how well IT is returning on the business’s

investment in IT. As IT spending and the department itself continue to grow, many organizations have

implemented a governance framework as an effective way ensuring that IT hasn’t become (or doesn’t

become) a large sinkhole for resources. This is done at the behest of upper management, who often feel

that they don’t have sufficient knowledge or insight into IT to judge its overall effectiveness, value,

efficiency, and so on.

Senior IT management may also use a governance framework to help decide which projects should

move forward, receive investment and resources, and which projects or functions should be cut back or

canceled.

238 CHAPTER 8 Security and Compliance

The IT Governance Institute (www.itgi.org) defines five IT governance domains:

• Strategic alignment. To ensure that an organization’s IT investments are aligned with the organi- zation’s strategic goals and will deliver business value.

• Value delivery. For optimizing expenses to ensure delivery on time and on budget and of appro- priate quality.

• Risk management. To ensure the safeguard of IT assets: security, controls, disaster recovery, confidentiality, privacy, vulnerabilities, etc.

• Resource management. Ensuring the optimal investment, use, and allocation of IT resources (people, applications, technology, facilities, data).

• Performance measurement. Tracking project progress and delivery and monitoring IT services.

Because it covers so many perspectives, different organizations may emphasize different aspects. For

example, in some organizations, the governance oversight may be involved primarily with project

management. In others, it may primarily be about compliance activities.

Committee of Sponsoring Organizations (COSO) From its own website, COSO “is dedicated to guiding executive management and governance entities

toward the establishment of more effective, efficient, and ethical business operations . . .” COSO has developed a framework to help organizations evaluate and improve their risk manage-

ment. The COSO framework for internal controls has several components:

• Internal environment • Objective setting • Event identification

• Risk assessment

• Risk response

• Control activities

• Information and communication

• Monitoring

The COSO framework has been adopted by thousands of organizations to help address their compli-

ance activities.

Control Objectives for Information and Related Technology (COBIT) COBIT was developed by the Information Systems Audit and Control Association and the IT

Governance Institute and is essentially a set of documents that provide guidance for computer security.

Much of COBIT is available at no cost.

COBIT breaks down the control structure into four major areas:

• Planning and organization

• Acquisition and implementation

• Delivery and support

• Monitoring

These are then broken down even further into 34 subcategories.

2398.9 Methodologies and frameworks

IT Infrastructure Library (ITIL) ITIL is published by the Office of Government Commerce in Great Britain. It focuses on IT services

and is often used to complement the COBIT framework. In 2008, DimensionData reported the results

of a survey showing that 60 percent of U.S. CIOs and 66 percent of organizations outside the United

States are working with ITIL.

ITIL consists of six sets:

1. Service support 2. Service delivery 3. Planning to implement service management 4. ICT (Information and Communication Technology) infrastructure management 5. Applications management 6. The business perspective

Within these, a number of very specific disciplines are described.

Although ITIL was originally created by a UK government agency, it’s now being adopted and used

around the world for best practices in the provision of IT service. The main focus of ITIL is IT service

management. While not designed specifically for compliance, the ITIL is often mentioned in the same

sentences as COBIT and COSO.

Capability Maturity Model Integration (CMMI) CMMI is a framework for process improvement, developed at Carnegie Mellon University’s Software

Engineering Institute. CMMI is designed to achieve process improvement across a project, a depart-

ment, or a whole organization. CMMI can help bring together functions that are often done separately,

set goals and priorities, and be a mechanism for appraising current processes.

The CMMI is probably best known for its five maturity levels:

1. Initial 2. Managed 3. Defined 4. Quantitatively managed 5. Optimizing

Each level represents the next step toward full process maturity and is characterized by several of the 25

defined “process areas.” Organizations can have their maturity level determined by using a Standard

CMMI Appraisal Method for Process Improvement (SCAMPI) appraiser. CMMI appraisal results at

the higher levels are coveted by many organizations and are a point of pride. Many organizations will

do press releases after getting a particularly good appraisal result.

International Organization for Standards (ISO 9000) The International Organization for Standards (known globally as “ISO”) is the world’s largest devel-

oper of standards. ISO standards address everything from standardization of paper sizes, credit card

sizes, public information signs, performance and safety, technology connections and interfaces, etc.

ISO isn’t a government organization; it’s essentially a network of standards organizations from over

240 CHAPTER 8 Security and Compliance

100 countries. ISO standards are voluntary; however, they often become requirements dictated by the

marketplace.

The ISO 9000 standard, originally developed in 1987 and revised every few years since, provides a

framework for quality management throughout the processes of producing and delivering products and

services. ISO 9000 really consists of the following three components:

• ISO 9000 Quality management systems. Fundamentals and vocabulary. • ISO 9001 Quality management systems. Requirements. • ISO 9004 Quality management systems. Guidelines for performance improvements.

ISO 9000 has five main sections:

1. Quality management system. Covers ensuring that an organization has established what its pro- cesses are, how they interact with each other, what resources are required, and how processes are

measured and improved.

2. Management responsibility. It is management’s responsibility to set policies, objectives, and review the systems, as well as communication to the organization about processes.

3. Resource management. Covers a wide range of specific resources, including human resources (such as numbers of competent workers, training, etc.), infrastructure, suppliers and partners, finan-

cial resources, and the work environment.

4. Product realization. Covers the processes that are needed to provide the product/service. 5. Measurement analysis and improvement. Collecting metrics about the products, customer

satisfaction, and the management systems and ensuring continual improvement.

The continuous improvement cycle of ISO 9000 can be summed up with the popular acronym of

PDCA—Plan, Do, Check, Act. PDCA was originally developed by Walter Shewhart in the 1930s

and is sometimes called the “Shewhart Cycle.” It was popularized by W. Edwards Deming, and some

have come to refer to it as the “Deming Wheel.”

Six Sigma Six Sigma was originally developed as a process for measuring defects in manufacturing and as a way

to work toward the elimination of those defects. Since its original incarnation for manufacturing, it has

been adopted by many organizations across a wide range of industries.

At the core of Six Sigma are two methodologies:

1. The DMAIC methodology has five phases and is for the refinement of existing processes: • Define the project goals and customer (internal and external) deliverables. • Measure the process to determine current performance. • Analyze and determine the root cause(s) of the defects. • Improve the process by eliminating defects. • Control future process performance.

2. The DMADV methodology also has five phases and is for the creation of new processes: • Define the project goals and customer (internal and external) deliverables. • Measure and determine customer needs and specifications. • Analyze the process options to meet customer needs.

2418.9 Methodologies and frameworks

• Design (detailed) the process to meet customer needs. • Verify the design performance and ability to meet customer needs.

The Six Sigma methodology also has roles and certifications that go by names such as Green Belt,

Black Belt, Master Black Belt, and Champion.

8.10 IT’S NOT JUST REGULATORY COMPLIANCE While this chapter provides a taste of the world of IT compliance, as required by various pieces of

legislation, there are other compliance activities outside of enacted statutes.

Electronic Discovery Frequently, IT departments are involved in many of the lawsuits that are brought against an organiza-

tion. It’s becoming more and more common for lawsuits to require a search for e-mail, documents, and

system logs.

• Class action lawsuits against a company (perhaps by investors or customers) • Disgruntled employees (often claiming wrongful termination) may bring action against an

organization

• Allegations by current employees of discrimination or harassment

• Invasion of privacy concerns (e.g., one employee claiming that another has had unauthorized access

to the first employee’s documents and e-mails)

• Lawsuits brought by partners, suppliers, customers, vendors, etc.

IT has found itself working with increasing frequency with the company’s Legal department to provide

information about IT operations (e.g., e-mail archiving policy, availability of backup tapes, responses

to subpoenas). As such, it’s becoming increasingly common for IT to review policies and procedures

with in-house lawyers before considering them approved.

Information and Records Retention Usually, the Legal department defines how long different type of business records must be retained. It is

important to remember that is up to the user and business owners of those files and records to hold on to

them, and then delete them when appropriate. While IT is essentially the custodian of those files and

can assist with implementing procedures to comply with retention requirements, it is not up to IT to

determine when files can be deleted. However, IT (with input from legal and the business departments)

can set policies on the retention of backup tapes, which should not be used as an archival mechanism.

Remember, backups are just copies of the files.

Working with Auditors It’s usually not sufficient for IT to simply establish their own procedures to meet regulatory compli-

ance. Very often, they need to prove their compliance to external auditors as well as internal auditors.

The discussion earlier in the chapter about maintaining evidence (section “Hidden Benefits of Maintaining Evidence” on page 238) goes a long way to help you prove that you’re doing what you’re claiming.

242 CHAPTER 8 Security and Compliance

While these audits can take a toll on IT resources, they do serve to help ensure that defined pro-

cedures are followed. Also, if something is overlooked, it’s better to find them during an audit than

as a result of an interruption of service or loss of data.

Disaster Recovery and Business Continuity While disaster recovery and business continuity may also be the subject of some regulatory compli-

ance, most organizations are concerned about it more for their own interests. Both of these subjects

are covered in Chapter 9, Disaster Recovery on page 247.

Definition of Policies and Procedures The compliance legislation discussed previously is sufficient reason for establishing policies and pro-

cedures. However, even without being compelled by law, it’s always wise to define and document pol-

icies and procedures for the IT department, as well as the user community.

For example, there may be an informal policy that has determined when personal printers (as op-

posed to shared network printers) are permitted. However, if this policy is documented and posted, it

helps ensure that all employees (both IT and users) are aware of it and that it can be applied consis-

tently. Other examples of policies that can be defined include:

• Password requirements (length, frequency of changes, etc.)

• Limits on the size of e-mail messages and mailboxes

• Retention period for files and messages

• Resources and rules in place for spam and virus defense (e.g., the blocking of certain attachment

types)

• Rules and approvals needed for nonstandard equipment requests (laptops, over-sized monitors,

equipment at home) • Requirements for password-protected screen savers • Process for dealing with nonstandard software requests

• Policies for disabling/deleting unused accounts

• Policies pertaining to IDs and access for nonemployees (temps, consultants, partners, sup-

pliers, etc.)

• Provisions for requesting a restore of files

• Approval required for accessing the files of a former or unreachable employee • Employee reimbursement for special services (cell phones, broadband connections at home) • Proper use of IT resources (e.g., no personal use of computer equipment, handhelds) • Guidelines for use of social networking sites during working hours and/or on company equipment.

• Limitations of support for company equipment at home

Of course, many of these policies should include comment and approval beyond IT before being con-

sidered official. In some cases (e.g., file and message retention), Legal should be involved. In other

cases (e.g., company equipment at home), it would be wise to involve HR and Finance. Involving other

departments not only helps IT establish partnerships with these groups, but it ensures that IT isn’t

determining policies in a vacuum.

2438.10 It’s not just regulatory compliance

Outsourcing Over the past few years, outsourcing and offshoring have become very attractive solutions. However,

it’s important to remember that when you outsource certain business activities, your organization is

still responsible for ethical and compliance activities. While outsourcing is adding value to your orga-

nization’s services, products, and bottom line, you want to make sure that you’re not risking the com-

pany’s reputation or compliance responsibilities as a result. Any agreement for the use of third parties

should take compliance, security, privacy, etc. into consideration; and detail the responsibilities and

expectations of the outsourcer.

For a much more detailed discussion on outsourcing, see Chapter 6, Managing the Money, on page 161.

8.11 Further References Websites [email protected] (Bugtrac mailing list). www.accenture.com/SiteCollectionDocuments/PDF/global_millennial_generation_research.pdf (report on

Millennials use of technology).

www.aicpa.org/InterestAreas/InformationTechnology/Resources/Privacy/PrivacyOutsourcing/ DownloadableDocuments/9127383_Privacy4.pdf (privacy and outsourcing).

www.cert.org (federally funded Computer Emergency Response Team at Carnegie Mellon). www.checkpoint.com (security solutions vendor). www.cisco.com (security solutions vendor). news.cnet.com/Tesco-to-track-milk-deliveries-by-RFID/2100-1033_3-6079022.html?tag¼lia;rcol. www.cnn.com/2011/TECH/web/06/26/tech.lulzsec.hackers. www.credant.com (mobile data encryption vendor). www.discover6sigma.org (information about Six Sigma). www.elcomsoft.com/survey/survey2009.pdf (survey about password security). www.isaca.org (trade association for IT governance professionals). www.isc2.org (industry organization leader in educating and certifying information security professionals). www.isixsigma.com (information about Six Sigma). www.iso.org (information about the International Organization for Standards and ISO 9000). www.itgi.org (trade association for IT governance professionals). www.itil-officialsite.com/home/home.asp (information about ITIL). www.juniper.net (security solutions vendor). www.mcafee.com/us (security software vendor). www.microsoft.com/technet/security/default.mspx (Microsoft’s security website). technet.microsoft.com/en-us/library/dd206732.aspx (Microsoft’s IT Compliance Management Guide). onguardonline.gov (a U.S. government site about computer security). csrc.nist.gov/index.html (National Institute of Standards and Technology’s website about computer security). www.organicconsumers.org/clothes/nike041505.cfm (article about Nike’s offshore practices). www.ponemon.org/blog/post/cost-of-a-data-breach-climbs-higher (report on the cost of data breaches). www.privacyrights.org/ar/ChronDataBreaches.htm#CP (list of data breach/loss incidents). www.sec.gov/news/studies/2009/sox-404_study.pdf (report on impact of Sarbanes–Oxley). www.securityguidance.com (Microsoft security assessment tool). www.security-risk-analysis.com/introduction.htm (introduction to risk analysis).

244 CHAPTER 8 Security and Compliance

www.sei.cmu.edu/cmmi (information about CMMI). www.slashdot.org. www.snpx.com (security website for IT professionals). www.symantec.com (security software vendor). www.trendmicro.com (security software vendor). pr.webroot.com/threat-research/cons/protect-your-computer-from-hackers-101210.html.

Books and Articles Alexander, P., 2008. Information Security: A Manager’s Guide to Thwarting Data Thieves and Hackers. Praeger.

Bacik, S., 2008. Building an Effective Information Security Policy Architecture. CRC.

Biegelman, M.T., Biegelman, D.R., 2008. Building a World-Class Compliance Program: Best Practices and

Strategies for Success. Wiley.

Chickowski, E., 2009. Is Your Information Really Safe? Baseline Magazine April.

Chorafas, D.N., 2008. IT Auditing and Sarbanes–Oxley Compliance: Key Strategies for Business Improvement.

Auerbach Publications.

DeLuccia, I.V., James, J., 2008. IT Compliance and Controls: Best Practices for Implementation. Wiley.

Foresti, S., 2010. Preserving Privacy in Data Outsourcing. Springer.

Greengard, S., 2011. Managing a Multigenerational Workforce. CIO Insight Magazine May/June.

Keefe, M., 2009. A Short History of Hacks, Worms, and Cyberterror. Computerworld April, 27.

Matwyshyn, A., 2009. Harboring Data: Information Security, Law, and the Corporation. Stanford Law Books.

McClure, S., Scambray, J., Kurtz, G., 2009. Hacking Exposed: Network Security Secrets and Solutions. McGraw-

Hill Osborne.

Mitnick, K., 2011. Ghosts in the Wires. Little, Browne and Company.

Perkins, B., 2011. Data Breaches’ Costly Fallout. Computerworld June 6.

Rashid, F., 2011. Cloud Security Services Can Reduce Malware. eWeek July 18.

Rashid, F., 2011. Hackers Shift from Vandalism to Data Theft. eWeek August 15.

Saporito, B., 2011. Hack Attack. Time July 4.

Selig, G.J., Wilkinson, J., 2008. Implementing IT Governance: A Practical Guide to Global Best Practices in IT

Management. Van Haren Publishing.

Senft, S., Gallegos, F., 2008. Information Technology Control and Audit, third ed. Auerbach Publications.

Sengupta, S., 2011. Guardians of Internet Security Are Targets. New York Times August 4.

Steele, B.K., 2009. Due Diligence. Baseline Magazine March.

Tipton, H.F., Krause, M., 2009. Information Security Management Handbook. Auerback Publications.

Vijayan, J., 2009. Internet Warfare: Are We Focusing on the Wrong Things? Computerworld April, 27.

Wallace, M., Weber, L., 2008. IT Governance 2009: Policies & Procedures. Aspen Publishing.

Whitman, M.E., Mattord, H.J., 2011. Principles of Information Security. Course Technology.

Wright, C.S., 2008. The IT Regulatory and Standards Compliance Handbook: How to Survive Information

Systems Audit and Assessments. Syngress.

SOX www.aicpa.org/Advocacy/Issues/Pages/Section404bofSOX.aspxnews.findlaw.com/hdocs/docs/gwbush/

sarbanesoxley072302.pdf.

HIPAA www.hhs.gov/ocr/hipaa. www.hhs.gov/ocr/privacy/hipaa/administrative/enforcementrule/hitechenforcementifr.html. www.hipaa.com/.

2458.11 Further references

Basel II www.bis.org/bcbs/index.htm. www.federalreserve.gov/generalinfo/basel2/default.htm.

SB-1386 info.sen.ca.gov/pub/01-02/bill/sen/sb_1351-1400/sb_1386_bill_20020926_chaptered.html. www.giac.org/paper/gsec/3647/californiasnotice-security-breachs-about-means/105901.

FACTA www.epic.org/privacy/fcra. www.ftc.gov/os/statutes/fcrajump.shtm.

Gramm–Leach–Bliley www.epic.org/privacy/glba. www.ftc.gov/privacy/privacyinitiatives/glbact.html.

U.S. Securities rules.nyse.com/nyse/www.sec.gov/rules/final/34-44992a.htm. www.sec.gov/rules/final.shtml.

Patriot Act thomas.loc.gov/cgi-bin/bdquery/z?d107:h.r.03162. www.epic.org/privacy/terrorism/hr3162.html.

OFAC www.asic.gov.au/asic/asic.nsf/byheadline/CLERPþ9?openDocument. www.treas.gov/offices/enforcement/ofac. www.treasury.gov.au/contentitem.asp?NavId¼013&ContentID¼403. www.treasury.gov/resource-center/sanctions/OFAC-Enforcement/Pages/enforcement.aspxCLERP-9.

PIPEDA www.pipedainfo.com. www.priv.gc.ca/leg_c/leg_c_p_e.cfm.

Privacy and Electronic Communications Directive eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri¼CELEX:32002L0058:EN:NOT. europa.eu/legislation_summares/information_society/legislative_framework/l24120_en.htm.

Data Protection Directive ec.europa.eu/justice_home/fsj/privacy/index_en.htm. www.spamlaws.com/eu.shtml.

246 CHAPTER 8 Security and Compliance

CHAPTER

Disaster Recovery 9 Organizing is what you do before you do something, so that when you do it, it is not all mixed up.

A. A. Milne

CHAPTER TABLE OF CONTENTS

9.1 Defining the Scope ........................................................................................................................248

9.2 Creating a Disaster Recovery Plan..................................................................................................253

9.3 A Word about Incident Response, Business Continuity, and Disaster Recovery ..................................260

9.4 The Hidden Benefits of Good Disaster Recovery Planning.................................................................261

9.5 Further References ........................................................................................................................262

It’s no secret that the daily routine of everyday life has become highly dependent on information

technology. And incidents like September 11, 2001; hurricanes Katrina and Rita in 2005; the blackout

of the Northeast in August of 2003; and many other crises serve as regular reminders that we have to be

prepared for the worst. This is where disaster recovery comes in.

Disaster recovery is like buying insurance; you’re planning for the worst, but the entire time you’re

hoping that you’ll never need it. IT disasters come in all shapes and sizes, from hardware failures and

computer viruses to blizzards, floods, chemical spills, fires, and terrorist attacks. As individuals, we

routinely do things to be ready for the unexpected emergency. We keep Band-Aids in the medicine

cabinet, a spare tire in the car, and a fire extinguisher in the house.

IT environments are replete with all kinds of solutions to deal with various outages and failures:

clustered servers, transaction logs, backups, RAID disk drives, and so on. The problemwith these kinds

of solutions is that each can only handle the failure of a specific component. This leaves IT Managers with the issue of what to do if the entire environment fails, or becomes unavailable.

As shown in this chapter, the key to good disaster recovery planning is the involvement of as many

areas of the organization as possible. IT can be the leader or motivator (although even that isn’t

required, but it’s a common situation), but all facets of a company must be involved in disaster recovery planning. The reason is simple: disasters of every size (from brief power outages to city-wide black-

outs) affect every department and affect every employee—possibly your customers and suppliers, too.

Everyone should be ready. Murphy’s Law that “anything that can go wrong will” would be just as apt a

quote for the beginning of this chapter as the one that appears.

IT Manager’s Handbook.

© 2012 William Holtsnider & Brian D. Jaffe. Published by Elsevier, Inc. All rights reserved. 247

9.1 DEFINING THE SCOPE The extent to which you as an IT Manager have to, or can, plan for a disaster is directly related to

how much your organization is dependent on IT for its core business operation and how much money

your organization is willing to invest to protect it. Today it is the rare organization that is not highly dependent on their IT operations.

When you start to think about disaster recovery and the infinite combination of things that could go

wrong and what you might have to plan for, you can easily find yourself losing a lot of sleep, thinking

there is simply no way you have it all covered. However, as stated in Chapter 8, Security and Compliance, on page 205, you need to take comfort in the very fact that you’re taking the right steps to best protect your environment. Remember, disaster recovery planning is an ongoing and iterative

process; you can never say, “Okay, now it’s done.”

Key Questions One of the most important steps in disaster recovery planning is trying to define the scope. While it is

not possible to think of every scenario, you can help put things in perspective with questions such as the

following:

• Which exactly are my critical applications and services? • How quickly do I have to recover those critical applications and services (seconds, minutes, hours,

days)? • What are the different scenarios to plan for?

• No access to the building (e.g., snow storm)

• Loss of data center (e.g., flood, fire)

• Loss of building (e.g., fire, hurricane, collapse)

• Loss of some public services (e.g., mass transit, access to Internet, electricity) • Geographic impact (e.g., a blackout that affects just a few blocks in your city or one that affects

50 million people across several states, such as the blackout in the northeast United States in

August of 2003) • How long of an interruption should be planned for (days, weeks, indefinite)?

• How quickly do I need access to my data and systems? Can I wait a few days, or do I need to be up

and running in 24 hours?

• Is last week’s backup good enough or do we need to be able to restore more current data?

Notice the range of disasters you need to think about. One- to three-day events such as snow storms all the

way up to events such as terrorist attacks have permanently changed the way we think about disasters.

Obviously, these are questions you can’t answer alone, and they can be the subject of endless dis-

cussion. The answers will vary greatly depending on the size of your organization, the industry you’re

in, and, probably most critically, the cost of the required resources.

Once the scope is agreed to by the key departments (HR, IT, Facilities, Legal, etc.), it’s critical that it

have the support of company executives. At a minimum, this would probably include the CIO and CFO.

But there are others that should be considered. For example, the Legal department and the departments

that deal with regulatory compliance may need to weigh in with their concerns. It is not unheard of for the

scope to be presented to the CEO and Board of Directors or perhaps one of the board’s committees.

248 CHAPTER 9 Disaster Recovery

During the process of defining the scope, you can expect to be educating others about your IT

environment. Some of the people you’re working with may assume that since they hear the word

“server” so often, they think that the company has just 1, not 100. They may think of the computer

room as that rack they saw in a closet five years ago and have no idea that it’s now a 2500-square-foot

facility with dedicated environmental services. In short, you’ll be explaining to them what is a moun-

tain and what is a mole hill. See the section “Getting Approval and Defending Your Budget” on page 165 in Chapter 6, Managing the Money, about how to present technical information to a non- technical audience. If you are addressing a Board of Directors or senior management, especially about a

topic as important as disaster recovery, you want to make sure your message gets across as cleanly and

professionally as possible.

Recovery Time and Recover Point Objectives As part of the scope definition phase, you have to determine two key objectives:

1. Recovery Time Objective (RTO): The amount of time between the disaster and when services are restored. The RTO parameter essentially quantifies how long you can/will be down for. Factors here

include the availability of space (such as a data center and office space), availability of equipment

(such as workstations, servers, storage), availability of connectivity (both local and wide area net-

works), and other resources (including staff and vendors) to help you restore the environment.

2. Recovery Point Objective (RPO): The age, or “freshness,” of data available to be restored. The RPO could be a factor of how often you do backups or how often the tapes are sent off site. In fact,

the exercise of determining your RPOmay lead you to re-evaluate your processes and schedules for

backups and sending tapes off-site. Technologies such as data duplication to remote facilities or the

ability to replay transaction logs can be very useful in mitigating the RPO. See the section “Value of Your Data” later in this chapter.

RPO and RTO are sometimes best illustrated graphically (see Figure 9.1).

Disaster Recovery Committee To get the answers to the questions posed earlier, you’ll need to work closely with others in the orga-

nization. Although it relies heavily on IT, disaster recovery planning isn’t a function of IT alone. It

requires the involvement of a number of other departments, including:

• Finance

• Human Resources

Time

Disaster

Recover Point Objective Recover Time Objective

Services restored

Age of data restored

FIGURE 9.1

RPO and RTO.

2499.1 Defining the scope

• Legal

• Key user departments (Manufacturing, Customer Service, etc.)

• Building Facilities

A committee like this can also help determine what the priorities are in the event of a disaster. What

about customer service? Financial stability? Regulatory compliance? Health and safety? These an-

swers can vary greatly depending on the organization’s industry. A Web-based retailer may consider

continued customer service as its key priority as a way of protecting its financial stability. A publicly

traded financial services company may place a high priority on investor relations, regulatory compli-

ance, and financial stability. A hospital may be willing to sacrifice all those things because it’s focusing

on the health and safety of its patients.

There are no standard answers to these questions and issues. Each organization must consider them

and come to a decision about their own priorities. And the answers won’t come easily or quickly. It

could easily take months just to determine the answers, and all this must happen before you can begin

to formulate the actual disaster recovery plans. Because of questions like these, and many more, it’s

important that the planning not be limited to IT alone.

The committee can serve not only to develop the plan, but also, in the event of a disaster, serve as a

decision-making body—one that provides leadership and guidance to the rest of the organization for

the duration of the disaster recovery effort.

Application Assessment To start determining where your technology priorities are, you’ll need an inventory of your applica-

tions. The items to track for each application in the inventory include:

• User community (departments, number of users)

• Vendor

• Database environment • Operating system environment • Interfaces to other applications, systems, and vendors/partners • Whether the application is considered “critical” • Which server(s) the application runs on

• Which teams support the application

• Periods of peak/critical usage (days of week, ends of months/quarters, season cycles)

• Executive usage

• Who needs to be notified when scheduling downtime or when there is an unexpected outage • Where the application installation media and instructions are stored

This inventory will be a critical tool for disaster recovery planning, and essentially helps you develop a

business impact analysis. A business impact analysis identifies the areas that may be the most vulner-

able and that would cause the greatest loss to the organization. With this information, you can begin to

assess, along with other departments, the criticality of your business’s applications. See the section

“What DoWeHaveHere” inChapter 7, Getting Started with the Technical Environment on page 189, for more information about inventories

Compiling all of this information is a lot of work, of course, but you should have done most of this

work for other reasons: you need these data to complete the inventory of your technical environment.

250 CHAPTER 9 Disaster Recovery

This topic is discussed in the last section of this chapter entitled “The Hidden Benefits of Good Disaster Recovery Planning” (page 261).

You’ll want to set up some guidelines for the assessment, probably along the framework of your

organization’s priorities. For example, if continued customer service is a key priority, you’ll have to

identify those applications associated with customer service.

In all likelihood, you’ll probably end up with several priorities of applications. An example of those

priorities, as shown in Figure 9.2, might be:

• Priority 1: Those applications that need to be returned to service within 6 business hours. • Priority 2: Those applications that need to be returned to service within 24 to 48 hours. • Priority 3: Those applications that need to be returned to service within 3 to 7 days.

• Priority 4: Those applications that need to be returned to service within 1 to 2 weeks.

• Priority 5: Those applications that can wait more than 2 weeks to be returned to service.

You may choose to define a Priority Zero for your applications, which would include the core services.

This could include items such as a network environment, remote connectivity, Internet access, and

DNS and DHCP services. For many organizations, e-mail might be considered a Priority Zero appli-

cation, along with telephone services.

To help you judge the priorities of your different applications, consider different questions:

• Are there risks to the safety of employees, customers, or the general public with an outage of dif- ferent applications?

• Are there any regulatory costs associated with an outage to this application? What happens if a requirement isn’t met? Is there a financial penalty? Would you be allowed to conduct business

if not compliant?

Recovery time ----->

Priority 1

Priority 2

Priority 3

Priority 4

Priority 5

Restored within 6 hours

Restored within 24–48 hours

Restored after 2 weeks

Restored within 1–2 weeks

Restored within 3–7 days

Application Priority

FIGURE 9.2

Sample application recovery priorities.

2519.1 Defining the scope

• What is the loss to the business if this system is unavailable? In addition to lost revenue, would there be penalties from partners for missed obligations? Would it impact the company’s financial and

credit ratings?

• How big is the concern about loss of the organization’s image or customer/public trust that may result from an outage?

• What is the likelihood of an outage of this application as a result of different types of disasters? • Are there redundancies already in place to help mitigate the impact of a disaster? These redundan-

cies could include items such as clustered servers, RAID technology for data storage, and backup

generators.

These types of questions force you to consider how big an impact each application, system, or resource

has on the organization, as well as the risk probability of different types of disaster. As shown

in Figure 9.3, the higher the risk and the higher the impact to the business, the higher the priority

should be.

Again, the specifics of the application prioritization, as well as the number of priorities, will vary

tremendously from organization to organization. And, these may even change depending on the time

of year.

The Value of Your Data At the same time you’re considering application priorities, you have to consider how much data loss you can tolerate. For example, in a payroll system, it may not be that much of a problem if the last two

days of changes have to be reentered (because the last backup available was taken 48 hours prior to the

disaster, and not many changes occur on a daily basis). In a brokerage house trading system, however,

the tolerance for data loss might be zero, necessitating real-time replication of all data. The volume of

data change in these two scenarios is very different.

Impact to Business Low

Ap plic

ati on

Pr ior

ity

High

High

P ro

ba bi

lit y

of R

is k

FIGURE 9.3

Application priority for disaster recovery.

252 CHAPTER 9 Disaster Recovery

9.2 CREATING A DISASTER RECOVERY PLAN Once you have the scope and identified the critical applications, you can begin to develop a plan. If you

expect to have any hope for any level of success in the event of a disaster, several key items must be

identified in order to develop that plan.

• Communication plan: A plan for contacting key personnel, customers, vendors, and employees. • Documentation: Written material describing the existing environment, procedures for declaring a

disaster, procedures for reestablishing services in a disaster recovery mode, etc.

• Real estate and IT facilities:Determine which location(s) people should meet up at if the facility is suddenly off-limits, inaccessible, or out of commission. Where can you set up servers and get

Internet connectivity? • Off-site storage of data: If your facility is destroyed, or inaccessible, make sure you have an up-to-

date copy of your data at an off-site facility. • Hardware availability: Make sure that you can get replacement hardware if yours is destroyed.

This list could include workstations, servers, routers, switches, storage (disk and tape), etc.

• Regular updating and testing: Your environment changes regularly (technology, people, needs, organization, procedures, etc.). You need to test and update your disaster recovery plan regularly to

make sure it retains its value.

Each of these items is discussed in the sections that follow.

Communication Plan The hallmark of a good disaster recovery plan is good communications. Disasters don’t necessarily

happen when everyone is sitting at their desks. They can happen on weekends or in the middle of

the night. People may be on vacation, at off-site meetings, or in transit.

To ensure that you can get word to people in an emergency, your organization should have a call list

that includes information, such as:

• Home phone number(s)

• Cell phone number(s)

• Non-work e-mail address(es)

This list should also include the geographic location of each person’s home, as well as cell phone

carrier(s). This information could be useful to quickly identify those people that may (or may not)

be impacted in an isolated disaster, such as a highway out of service due to a chemical spill or those

using a carrier struggling with restoring service.

The list should include individuals from within the company and from outside the company:

• All members of IT

• Key executives, customers, and clients

• Individuals from key departments (Facilities, HR, etc.)

• Key partners and suppliers (vendors, financial institutions, telecomm carriers, off-site storage

facility, etc.) • Appropriate regulatory agencies

2539.2 Creating a disaster recovery plan

For some contacts (such as vendors and suppliers), you should also be sure that the list includes

appropriate identifying information (such as account numbers) to help avoid delays and confusion.

Remember, it is not IT’s job alone to put together the contact information; each team and department

has responsibility.

The list should exist in electronic form (such as on your phone or handheld device, your PC, or USB

memory drive) as well as in paper form in multiple locations (home, office, car, predetermined off-site

meeting locations). In a situation where a large number of individuals have to be contacted, a phone tree

can be used. Alternatively (or in addition), you can use a third-party crisis communications service such

as Send Word Now (www.sendwordnow.com) or Everbridge (www.everbridge.com), which can fa- cilitate communications to very large groups of people quickly through multiple means (phone, e-mail,

text messages). Similarly, a web site set up specifically for providing information in an emergency can

be invaluable. A web site like this should be hosted external to your facility to ensure that it can be

reached if your facility is off-line. Of course, such a web site has to be secured properly so that sensitive

and critical information isn’t available to unauthorized individuals, and hosted separately from your

regular IT environment so that it stays up while the rest of the environment is down.

Documentation Thorough and up-to-date disaster recovery documentation is the foundation of an effective disaster

recovery plan. Although the document can be distributed electronically, as discussed in the previous

section, it should also be distributed in hard copy as well. After all, in the event of a disaster, there is no

certainty that you’ll be able to access the electronic version. (We don’t like to admit it, but sometimes

that note you scribbled on the back of a restaurant receipt ends up being more accessible and more

useful than that Outlook reminder you sent yourself last Thursday.)

Key individuals should have at least two copies—one copy in their office and one in their home—

since there is no guarantee that a disaster will happen between 9 and 5 on a business day. Finally, keep a

copy with your off-site backup tapes at locations that can be used during a disaster.

This documentation will become an indispensable resource. Memories fail, particularly in a crisis.

In fact, aside from your backup tapes, your plan may be the only resource available to you during a

disaster. As such, it’s in your best interest to make it as useful as possible by including as much infor-

mation as possible in this document. This should include documentation about the existing

environment.

All documentation should be reviewed and updated at least once a year to reflect changes to the

environment, operations, personnel, procedures, etc. These review opportunities can be a great time

to keep key people current on the plans and to educate new employees—don’t assume that everyone

will read the plans on their own.

Real Estate and IT Facilities One of the first questions that must be considered in regard to disaster recovery planning is “Where

should we go now?” If you’re unable to use your organization’s facilities, where will everyone go when

disaster strikes? If your organization is very small, you might be able get away with operating for a

small time out of someone’s residence. A slightly larger organization might be able to use a meeting

or banquet room at a nearby hotel, assuming that the same disaster hasn’t impacted those facilities.

254 CHAPTER 9 Disaster Recovery

Other alternatives might include a nearby branch office of your organization or perhaps the office of a

sister, subsidiary, or parent company.

However, if your IT organization is more than a few people in size, you’re probably going to need

specialized facilities with sufficient space, air conditioning, electricity, telecommunications resources,

and so on. This may be the case even if you’re only supporting a portion of your normal operation, even

for just an interim period. Many companies offer disaster recovery facilities. They can generally tailor

their offerings to your needs, perhaps just providing space or, at the other extreme, providing specified

computer hardware, telecommunications, and perhaps even some staffing.

Of course, the ultimate in disaster recovery facilities is for an organization to maintain its own

standby site with redundant hardware. For the most critical environments, the standby site is always

live, connected to the network, with a mirrored copy of the database and applications, and so on.

Disaster Recovery Facilities Considerations When looking at companies that provide disaster recovery facilities, you have to consider several

issues:

• Proximity to your location:You generally want a nearby location in order to get to it easily, but not so close that the facility is likely to be hit by the same disaster that affects yours. You may need to

consider a facility that is reachable by mass transit if you’re in a large metropolitan area where not

everyone has their own car. • Costs: The more services and facilities you want to be ready for your needs, the more it will cost.

Contracts for disaster recovery usually last at least two years and are billed monthly. However, there

are several aspects to disaster recovery fees:

• Standby fees: The monthly fees you pay to have contracted facilities available for your use

• Activation fee: A fee you pay when you decide that you have a disaster that warrants use of the

facilities

• Use fee: The rate (weekly, monthly) that you pay while you’re using the facilities during a

disaster • Test fee: A fee that is paid when you want to make use of the facilities to test your disaster

recovery plans • Number of clients: You want to be sure that the provider you’re working with hasn’t contracted

with more clients than it can provide services for. If there is a regional disaster, and all the provider’s

customers suddenly need to use the facilities, will there be enough to go around? Disaster recovery

providers can either provide you with dedicated space that will always be there for you, or non-

dedicated space that is made available to their subscribers on a first-come–first-served basis.

Of course, the dedicated space is far more expensive. • Other required services: Space, hardware, staff, telecommunications, air conditioning, electricity.

Don’t forget basics such as furniture, phones, and so on.

In the event of a disaster, one of the critical decision points is when to fail-over to the recovery site.

In the event of a catastrophe such as an earthquake that destroys your primary facility, the decision

is pretty easy. However, in the case of a blackout, it is reasonable to think that the power will

be back on soon enough, and the time, cost, and effort to bring up the disaster recovery facility (along

with reverting back to the primary facility) does not outweigh the benefits of being down for a

short period.

2559.2 Creating a disaster recovery plan

Because of this, many environments don’t configure their hardware and software to automatically

fail-over to the backup facilities if a problem is detected at the primary site. Often, the fail-over process

is something that has to wait for a human decision to be specifically initiated.

Off-Site Storage of Data Backup Tapes If you need to activate a disaster recovery plan, make sure that you can get your company’s systems and

data up and available. Most likely, you’ll have to do some sort of restore from your backup tapes.

If your regular facility is destroyed or inaccessible, you’ll have to retrieve the backup tapes from your

off-site storage vendor.

To get those tapes, you’ll need several items:

• Contact information for your off-site location

• A method of identifying which set of tapes you want retrieved

• A customer ID, account number, and possibly a password as a way of identifying yourself to the

off-site location as someone authorized to request that the tapes be retrieved

• The address of, and probably directions to, the location of where the tapes should be delivered

(you most likely won’t want them delivered to your usual facility)

Getting the tapes is the first step. Then you have to begin the restore process. You’ll need to have

access to compatible hardware and software that can read those tapes, and have procedures for doing

the restore. Also, if you normally encrypt your backup tapes, your recovery site has to have the

appropriate technology and copies of the encryption keys to ensure that the backup tapes can be

unencrypted. Some companies are moving to tapeless backup by copying their files to a remote

facility over a network (see the next section, “Data Replication” on page 256). While this simplifies some of the issues of getting your tapes, you still have to make sure that your recovery site has con-

nectivity to the backup data. For those organizations operating in the cloud (discussed further in

Chapter 5, Software, Operating Systems, and Enterprise Applications on page 135), things are even simpler.

Data Replication If you have an identified disaster recovery facility, with hardware, there are a number of options, in

addition to backup tapes, that you can use for making data readily available in an emergency.

• A number of storage vendors (e.g., EMC, NetApps, IBM, Hewlett-Packard) have solutions for

replicating data between sites. These utilities don’t duplicate the entire data set, but merely the

changes (usually referred to as the “deltas”), which results in the two copies being in synch. Similarly, third-party utilities can do the same thing (Double Take, LinkPro, Neverfail, etc.).

• Database vendors (e.g., Oracle, IBM, Microsoft) have features and utilities for keeping multiple

copies of databases in synch. Similar to the data replication feature just discussed, this is strictly

for databases. • Transaction logs can be regularly replicated to your secondary site where they can be imported into

the copy of the database.

256 CHAPTER 9 Disaster Recovery

Hardware Availability If your regular computer hardware is unusable for any reason (e.g., a power outage or the destruction of

your facilities), you’ll have to quickly get your hands on some computer hardware before you can even

begin rebuilding your environment.

Size of Your Environment The smaller and more generic your environment is, the more options you’ll have. For example, if your

environment is based onMicrosoftWindows and Intel PCs and servers, you may be able to rely on local

retailers or your regular reseller. Alternatively, you can contract with your disaster recovery facility to

keep a quantity of these units on hand for you.

With larger or more complex environments, it will be more difficult (and more expensive) to make

sure the equipment will be available. You may want to purchase some of this equipment yourself to

have in an emergency, or your disaster recovery facility provider may do this and pass the cost on to

you. Your vendor may also have options and provisions available to allow you to receive emergency

delivery of specified equipment in the event of a disaster.

For larger environments you may consider having a dedicated facility, either at your own site or

from a disaster recovery provider, that is a running environment with all your necessary hardware.

Duplicating Your Entire Environment In case of a disaster, you may not need to duplicate your entire environment. You probably just want

to plan for bringing up the systems that are the most critical to the continued operation and survival of

the organization (as discussed previously in this chapter in the section, “Application Assessment” on page 250). Tomake sure that your recovery operation is as smooth as possible, you’ll want to ensure that you’re using equipment as comparable as possible to your existing environment. The middle of

a crisis isn’t the time to find out that the emergency tape drive you have isn’t compatible with the

backup tapes you use, that you don’t have the proper drivers for the network interface cards you’re

using, or that your application software has to be recompiled before it will run on the hardware

you have.

Equipment at Home If your plan includes people working from home, be sure they have what they need:

• Workstations with appropriate software (either the applications they need and/or software for

remote access to reach those applications and data). If it’s a laptop you gave them strictly to be

used in the event of a disaster, you’ll want to check the laptop periodically to make sure it’s still

functioning, has up-to-date software, etc. • Familiarity with procedures for connecting remotely (especially for connecting to a recovery site).

Regular Updating and Testing A disaster recovery plan needs to be reviewed and updated regularly. Just as important is testing the

plan periodically.

2579.2 Creating a disaster recovery plan

Review and Update At least once a year you should review your plan for the following:

• Is the emergency contact list current? Check it to verify that it doesn’t contain individuals who have

left the company or are no longer relevant to the plan, that new employees have been added, and that

the contact information on the list is accurate. • Are your own internal safety nets still working? You’ve probably installed a number of redundant

resources to use in case of emergency. However, too often, when an emergency strikes, the backup

facility fails because it isn’t working either. Perhaps it hasn’t been used for so long that it’s fallen

into disrepair or perhaps it hasn’t been kept up to date with upgrades. Regular testing of your

redundant resources is important. A spare tire is of no use if there’s no air in it.

• Can the backup tapes be read by the equipment at the backup site?

• Do you have copies of the media and installation instructions for the requisite software (operating

systems, applications, backup software, etc.) that may have to be installed before you can begin

restoring your data from tape? • Are all associated components factored in? If your check-printing application is considered critical,

for example, you have to include the availability of a printer during an emergency in addition to

bringing up the application to be adequately prepared.

• Do you have current critical passwords for applications, servers, websites, databases, etc?

Testing Just like you check the pressure in your spare tire periodically to make sure it would be useful when you

need it, you also need to test your disaster recovery plan periodically to make sure it will work for you

when needed. This can be an enormous task, requiring a fair amount of planning of its own.

• You’ll need a way to take your primary site off-line (or at least have it seem off-line). You may

be able to power down your environment or disconnect its WAN connections. Regardless, your

monitoring and management solution will start sending a number of alerts. • Develop a test plan and script to run through to make a determination if things are working as

expected. • Coordinate with all parts of IT and user department representatives to prepare for and participate in

the test.

• To get the most value from the test, you want to have a rigorous postmortem process to evaluate

what aspects didn’t work, why they didn’t work, and what has to be changed so that they’ll work the

next time.

If there is simply no way to plan downtime to your production environment (perhaps because your

organization runs 24/7), you may have to consider doing tests in phases, testing just a few systems or components at a time. In very large environments, it can take months to plan out a single test of

a disaster recovery plan.

Don’t be surprised if your testing isn’t 100% successful. Developing and testing disaster recovery

plans are iterative processes. Also, remind yourself that it is certainly better to identify problems during

a test than during a real crisis.

258 CHAPTER 9 Disaster Recovery

After the Disaster An often forgotten aspect of disaster recovery planning are the steps required once the disaster abates

and things can return to normal. While in disaster-recovery mode, you’ve been running critical systems

and applications out of your disaster recovery facility. When the disaster is over and you can return to

your primary facility, you now need to have a plan to get data from the disaster recovery facility (which

now has the most current data) back to your primary site.

The process will probably be somewhat similar to the one you used to get then-current data to your

disaster recovery facility (duplication of transaction logs, tapes, data replication, etc.). Of course, this

process has to be done after you’ve repaired any damage that may have occurred to the primary facility,

or the systems it contains.

Regional and Catastrophic Disasters Many disasters are often a result of the forces of nature (e.g., the Northeast blackout of 2003 and

Hurricane Katrina in 2005). As such, if your organization suffers a disaster, it’s likely that many other

organizations in your geographic area will also suffer, and they may be scrambling for the same recov-

ery resources that you’re planning to rely on.

• The local computer retailer may be rushed by other organizations trying to get their hands on

hardware.

• Hotel rooms may be sold out.

• Because telecommunications companies will be working around the clock to get regular services

restored, your plans to install temporary lines may not pan out. • The very vendors and service providers you had planned onmay not be functioning because they are

dealing with the same disaster you are.

A key issue to keep in mind in this regard when crafting your disaster recovery plan is to incorporate

some non-local options for each category in the plan.

Finally, it’s important to remember that in the event of a truly catastrophic disaster, employees’

priorities will quickly shift from trying to aid their employer to trying to aid their families. For dealing

with the human side of disasters, see the next section.

The ACT Model Most of the chapter has focused on the mechanics and technologies of dealing with a crisis. However,

it’s also wise to plan for individuals (staff, employees, etc.) during a crisis.

Consider the guidelines of the ACT model:

A—Acknowledge and name the trauma. Have the courage to use names and the real words describ- ing what happened, including the word “death” (if warranted, of course). It’s important to validate

the accuracy of information and share only what is known for sure. Know the facts and don’t spec-

ulate. (New York City’s Mayor Rudy Giuliani’s refusal to speculate on the cost in human lives

during the 9/11 disaster was an excellent example of the value of waiting until all the facts were in.

2599.2 Creating a disaster recovery plan

Hewas asked about the toll repeatedly for many days, but refused to give a number until he knew the

facts.) Straying from the script can be very harmful. Personally acknowledge the incident in order to

position company management as also being impacted by the event, thereby aligning leaders with

the staff.

C—Communicate both competence and caring. Competence and caring aren’t mutually exclusive! Demonstrate expertise in dealing with the issue and express compassion for the personal impact to

those who are affected.

T—Transition. Communicate an expectation of recovery. Show sensitivity and flexibility as people return to life and return to work. Communicate clearly that leadership will take steps to help people

transition back to health and productivity. Identify internal and external resources for additional in-

formation and support. Be especially visible and accessible to employees for support and information.

The ACT model focuses on direct and honest communications and demonstrating sensitivity.

9.3 A WORD ABOUT INCIDENT RESPONSE, BUSINESS CONTINUITY, AND DISASTER RECOVERY Incident Response, Business Continuity Planning (BCP), and Disaster Recovery (DR) are often used as

interchangeable terms. Although the three types of planning are similar, there are differences.

• Incident Response: This is the name for the immediate steps taken to ensure the protection of peo- ple. The focus is on employee safety and well-being. Incident response includes simple building

evacuation procedures, communications, accounting for all employees to ensure that they are safe,

and determining next steps like initiating business continuity and disaster recovery plans.

• Business Continuity Planning: BCP is a methodology used to create a plan for how an organiza- tion will resume partially or completely interrupted critical function(s) within a predetermined time

after a disaster or disruption. BCP helps prioritize recovery activities for critical functions. BCP

may be a part of a larger organizational effort to reduce operational risk, and thus has a number

of overlaps with the practice of risk management. • Disaster Recovery: DR is the ability to establish (or restart) an infrastructure for resuming critical

functions after a disaster.

These areas do overlap and, to a certain degree, are interdependent. Most confusion rests with the terms

“business continuity planning” and “disaster recovery.” To help differentiate between the two, it’s best

to think of disaster recovery as those areas and issues related to the IT environment and infrastructure

(data center, servers, access, data, applications, etc.). The remaining items, the business’s day-to-day

function, would generally fall into the area of business continuity planning.

Business continuity essentially picks up where disaster recovery leaves off. In a perfect world you

have a parallel data center that is a mirror image of everything in your primary data center. When

disaster hits, you can invoke your disaster recovery plans to bring the parallel data center online

with all applications and no loss of data. Then business continuity comes into play as the user

departments attempt to continue functioning. “Continuing their normal function” becomes quite

challenging if there is no electricity and/or phones, travel is severely curtailed, people can’t get to

the office, etc.

260 CHAPTER 9 Disaster Recovery

For example, while disaster recovery planning would cover the following issues:

• Secondary data centers

• Off-site storage of backup tapes

• Redundancy/availability of technical resources

• Replication of data

• Procedures and resources for installing applications, related systems, and making them available

• UPS and generator solutions

BCP would cover issues such as:

• Communication plans

• Lists of cell phone numbers

• Plans for communicating to the employee population at large, as well as those critical in a di-

saster scenario (emergency phone numbers, websites)

• Where people will meet to continue to conduct business if the office is unavailable

• Locations of nearby hotels, restaurants, and other services if the need arises • Plans for continuing key business operations and working with critical customers and partners

(banks, suppliers, etc.) during a crisis • Copies of vital files and information

• Availability of cash

• What would the sales department do? Could/should they continue to try to sell products? How

would they reassure customers?

• How would the accounting department make sure that the company’s suppliers are paid and that

receivables are collected? • How would customers, suppliers, partners, clients, investors, and employees be kept informed? • Could payroll continue to pay employees during the disaster?

As a general rule, the IT department’s greater priority is disaster recovery, while user departments are

generally concerned about BCP.

9.4 THE HIDDEN BENEFITS OF GOOD DISASTER RECOVERY PLANNING One seldom recognized value of good disaster recovery planning is that it often helps tremendously

with regular, everyday corporate process execution. Good disaster recovery makes for good everyday

business performance.

• You need to know exactly where every piece of hardware in your company is anyway: where is it,

how old is it, what applications/services does it provide, who supports it, etc. But if you can’t find

the time to do this kind of inventory on a regular basis, you should find the time to do it for a formal

disaster recovery plan. • If you don’t have current contact lists for people outside your direct reports, here is a chance to

create one and keep it current. • Naturally, you should have very complete data backup procedures. But if you haven’t yet set up off-

site backup, creating a disaster recovery plan can force you—or higher ups, once you put it in the

context of disaster recovery—to get the time and money to make this basic need happen.

2619.4 The hidden benefits of good disaster recovery planning

9.5 Further References Websites www.capscenters.com (computer alternative processing sites, CAPS). www.doubletake.com (data replication software). www.drj.com (Disaster Recovery Journal). www.drs.net (Disaster Recovery Services, DRS). www.everbridge.com (crisis communication tool). www.hp.com/go/continuityandavailability (HP Business Continuity and Availability Services). www.ibm.com/services/continuity (IBM Business Continuity and Recovery Services). www.linkpro.com (data replication software). www.neverfailgroup.com (data replication software). www.recovery.sungard.com (SunGard Recovery Services). www.rentsys.com (Rentsys Recovery Services). www.sendwordnow.com (crisis communication tool).

Books and Articles Blokdijk, G., 2008. Disaster Recovery 100 Success Secrets—IT Business Continuity, Disaster Recovery Planning

and Services. Emereo.

Bowman, R.H., 2008. Business Continuity Planning for Data Centers and Systems: A Strategic Implementation

Guide. Wiley.

Dolewski, R., 2008. Disaster Recovery Planning. McPress.

Hiles, A., 2010. The Definitive Handbook of Business Continuity Management. Wiley.

Hotchkiss, S., 2010. Business Continuity Management: In Practice. British Informatics Society Ltd.

Nash, K.S., 2011. When Disaster Hits Home. CIO Magazine July 1.

National Fire Prevention Association, NFPA 1600, Standard on Disaster/Emergency Management and Business

Continuity Programs. www.nfpa.org/assets/files/PDF/NFPA1600.pdf. Preimesberger, C., 2011. Why Disaster Recovery Isn’t Optional Anymore. eWeek July 18.

Rothstein, P.J., 2008. Disaster Recovery Testing. Rothstein.

Schmidt, K., 2010. High Availability and Disaster Recovery: Concepts, Design, Implementation. Springer.

Thejendra, B.S., 2008. Disaster Recovery and Business Continuity. IT Governance.

Wallace, M., Webber, L., 2010. The Disaster Recovery Handbook: A Step-by-Step Plan to Ensure Business

Continuity and Protect Vital Operations, Facilities, and Assets. AMACOM.

Watters, J.P., 2010. The Business Continuity Management Desk Reference. Leverage.

262 CHAPTER 9 Disaster Recovery

CHAPTER

Working with Users 10 Pay attention to what users do, not what they say.

Jakob Nielsen

CHAPTER TABLE OF CONTENTS

10.1 Relationships with Users .............................................................................................................263

10.2 The Consumerization of IT ...........................................................................................................271

10.3 When Your Users are Part of a Mobile Work Force........................................................................274

10.4 The Help Desk.............................................................................................................................275

10.5 Service Level Agreements............................................................................................................283

10.6 Further References ......................................................................................................................284

The relationship you and your team have with the user community is one of the most important relation-

ships you will have to maintain. In some regards, your reputation in the company can be measured by

your relationship with the users. If you have a positive relationship, the user community (which for IT is

essentially everyone in the organization) will be your ally for almost anything you want to do. How-

ever, if that relationship is less than positive, the user community will question and doubt all your

plans—both the value of those plans and your ability to implement them successfully. Later in this

chapter there is a discussion about Help Desk services on page 275, the most visible and most com- monly thought of aspect of working with users. But first we discuss the overall relationship you and the

IT department must maintain with the users.

10.1 RELATIONSHIPS WITH USERS One of the most important things you can do as an IT manager is to establish and maintain a good

relationship with your users. They should see you as available, reliable, dedicated to service, and

having their best interest at heart. For the most part, they do not care about your other customers,

your bosses, the vendors, the technology issues—they care about their own needs. Prior to becoming

a manager, you had exposure to only a portion of your users, and only a portion of their IT needs.

Now that you’re managing the entire department, all the users, and all their IT needs, rest squarely

on your shoulders.

IT Manager’s Handbook.

© 2012 William Holtsnider & Brian D. Jaffe. Published by Elsevier, Inc. All rights reserved. 263

One of the recurring themes in this book is the importance of understanding who your users are,

what they need, and what are they doing that could impact or benefit you. While this chapter is

dedicated to your role with the users, we also discuss related issues in detail in other parts of the book:

• In the section “The First 100 Days” on page 20 in Chapter 1, The Role of an IT Manager, it is explained that you need to determine who your team members and who your customers are; and

that there are different user areas that will require your attention, and different user areas whose

attention you require. • The section “People to Meet and Know” on page 24 in Chapter 1, The Role of an IT Manager,

discusses that there are many people you should establish relationships with, including your staff,

your peers, and your boss, but it doesn’t end there.

• As discussed in the section “Communicate with Your Team” on page 32 in Chapter 2, Managing Your IT Team, communicate your vision for the department to your staff. They should understand both where you want the department to go and the plans you have for getting there.

• Users of different generations may have different priorities, styles, and preferred ways of dealing

with others. The discussion in the section “Generational Issues at Work” in Chapter 2, Managing Your IT Team on page 57 covers this in detail.

Who Are Your Users? IT departments have all kinds of users that represent a cross-section of the company: executives,

assistants, local users, remote users, finance, marketing, warehouse, human resources, facilities, users

that love technology and users that hate technology.

It’s important to note that some organizations don’t like the term “user.” Because IT is a service-

focused organization, many organizations prefer “customer” or “client” instead. In an organization like

a law firm, the term “client” could cause confusion, just as in other organizations the term “customer”

might cause confusion.

Regardless of what they are called, users’ needs are best addressed in a thorough and planned man-

ner. Everyone knows what the results of knee-jerk reactions to problems are; the problem may get

solved, but much more money and/or time is spent than should have been. Or the visible part of the

problem goes away, while the underlying cause remains only to resurface at some point in the future.

Spend some time in advance planning to address your users’ needs.

Find Out Who Your Department Thinks Its Users Are Don’t quibble, keep focused: who are the people your department is trying to serve?

This can be a simple inquiry; ask your team while you are discussing other matters with them. Keep

it informal. They may say that their users are a small subset of the company; they may reply that their

users are mostly in Legal or “Tom S., who calls me all the time.” While these are true, they are not the

entire story. Your users may also include customers or business partners of the company; find out who

they are, where they are, and how they function within their company, what their relationship is with

your department, and what they want out of the relationship.

For a fuller discussion of this very important topic, see the sections “Developing an IT Strategy” on page 10 and “DetermineWho Your Customers Are andWhat Their Needs Are” inChapter 1, The Role of an IT Manager on page 12. Your “customers” may or may not be who you think they are.

264 CHAPTER 10 Working with Users

Find Out Who Your Boss Thinks Your Users Are This is an important perspective for a few reasons. First, it gives you some insight into how he views the

organization’s world. Second, it will probably alert you to where some of the challenges are. Those

challenges might include some political minefields, or perhaps information on areas that have been

particularly critical of IT’s services.

If your boss’s perception of who your users are varies significantly from yours, you need to learn

why the difference exists, and which one of you is right. (It’s a safe bet you’re both right, though.) If

your boss always mentions the shipping department’s needs and problems, ask why he never mentions

the sales department.

Having spoken to your team and your boss, now canvass the rest of the organization. Contact the

heads of the major departments of the company. Obviously, size matters. If you work for a 10-person

start-up, talking to all the key players will not take long, nor will it be a major effort. You still need to

prepare, but you can do it fairly quickly. On the other hand, if you work for a Fortune 500 corporation

with divisions around the globe, canvassing your users is going to require some careful sampling.

Meet the Users Once you’ve started to assemble a list of who your users are (either by name, or group, or function) you

need to meet with them, establish a relationship, and ask them some questions about their needs.

These questions can help to get the discussion started:

• What services do you currently get from the IT department?

• How well does IT satisfy your needs?

• Have we fallen short in any areas? Or surpassed expectations in others?

• Which services do you need, or would you like, that you are not currently getting?

• How do you view the use of information technology in your department? • Who else would be worth speaking to? • What are your short-term and long-term goals and needs? • Have you read, or heard, about any technology solutions, perhaps used by competitors, that you’d

like to explore?

Ask these questions of the key department managers in your company. Tell them you are trying to align

your department’s functions with their needs. They may look at you funny—especially if they haven’t

seen this level of interest before from IT—but they will usually be happy to chat.

Use meetings like this to establish a continuing dialog and relationship with key users and depart-

ments. This might be an ongoing process, or it might be facilitated through periodic meetings, perhaps a

few times a year.

And remember that these discussions should not be one way. You have as much information to

share as your users do. See the section “Sharing Information” later in this chapter on page 266. Although much of the discussion may be at a high level, you may also get one or two detail items

(e.g., “This printer always jams with legal paper,” or “Whenever I log in from home I always have to

enter my password twice”). These are great opportunities to demonstrate for them what they can expect

from you as the new IT Manager. You should investigate these problems and make sure that they are

resolved. Then, just as important, follow up with that department head to tell him you looked into the

26510.1 Relationships with users

problem(s) he reported and provide an explanation of what was found, and how it was addressed. Even

though they are small problems, you’ll be showing that you listened to what was said, cared about it,

took action, and followed up. You’ll never be faulted for demonstrating those traits.

What you are trying to do is establish and develop a relationship. Remember that in the beginning,

the most important asset you may bring to these discussions will probably be a set of ears.

Being Available and Reachable It is important to remember that IT is a service organization and is there to provide services to others,

whether they are customers, partners, or end users. As such, one of the easiest ways to damage your

reputation is by ignoring those you are supposed to be servicing. “Ignoring people” comes in all shapes

and sizes; it can be not responding to phone calls and e-mails, skipping meetings you’re invited to, or

failure to follow up on commitments youmake. Invert the last sentence and you can see how you should be operating with the users.

Of course, a prompt follow-up and response are only half the equation. The other half is being pro-

active. A number of things can be done to show that you are always thinking about the user community:

• Call and/or meet periodically with various key users and department heads to review project status

and to discuss new initiatives, pain points, etc.

• Send e-mails to users about new solutions that you think they might find valuable and offer your

team’s assistance to help investigate. • Alert users to articles in your trade journals about what other organizations are doing and how others

have addressed the same problems the business areas in your company are facing.

• Notify them if you hear about seminars, webinars, trade shows, conferences, user group meetings,

websites, and so on that you think would be of value to them.

• Discuss with your users activities that are going on in the industry that relate to them. If your HRIS

vendor merges with another or releases a new version of their software, your VP of HR will prob-

ably be very interested. • Make training, FAQs, and tips and tricks available. • Share IT plans and activities (see next section).

Sharing Information Some individuals and teams seem to be reluctant to share information about what they are doing, and

what’s going on in their areas. However, one of the best ways to get others to share information with

you is to start off by sharing information with them. In addition to some of the ideas mentioned in the

previous section, there are other ways to share information with your user community:

• Share a high-level status of all of IT’s projects, particularly those that will benefit the user commu-

nity. The users may not care as much about purely technical activities (such as expanding the

SAN), but they will be interested in those that benefit them directly, improve service levels and

reliability, enhance functionality, generate revenues or cost-savings, etc. • For key users and department heads, provide a deeper dive into the projects that are directly related

to them. Of course, as discussed in Chapter 4, Project Management (page 103), these stake- holders should be getting regular project status reports from the project managers. But there will

be added emphasis if you personally review the status with the key individuals.

266 CHAPTER 10 Working with Users

• Share the results of your own metrics, both good and bad. These metrics can include statistics

about the Help Desk, user surveys, transaction processing, response time, system reliability,

etc. You should include commentary explaining what led to the metrics changing (or why they

haven’t changed) and what steps you plan to address areas that haven’t improved or have

deteriorated. • Don’t be afraid to alert users to problems that IT is having.When there is a problem it is important to

acknowledge it and to talk about your plans. For example, if one of your databases is suddenly

responding very slowly, advise the users that IT is aware of it and is working on the problem. If

nothing else, you may deflect some calls that were going to the Help Desk. Provide periodic updates

until the problem is resolved.

• Make others aware of steps you’re taking to reduce costs, as well as significant changes in IT’s

operations and strategies. • Share how changes to the industry (either IT or your organization’s), changes in key vendor plans,

or changes in regulatory requirements will impact your team, and your plans to address them. • Let your users know about the mission, values, strategies, and goals you’ve developed for IT.

• Consider doing a high-level presentation of IT’s activities on a regular basis (quarterly, semiannu-

ally, annually).

Not only does this put your and your department in a positive light regarding transparency and infor-

mation, it also helps convey a sense of what IT actually does. You know the IT department does a lot more than resetting passwords; now it is your job to show them that.

Just as important as what information you share is how you share it. As mentioned earlier, you’re better off sharing proactively instead of just responding to request and inquiries. However, consider

different mechanisms for sharing. In some cases, an e-mail is appropriate. In other cases, a more in-

teractive mode, such as a phone call or in-person meeting, or even just walking around for the spon-

taneous chat, will help to greatly further the discussion and the relationship. Alternatively, you may

want to meet formally with a group of key users to share some information. Also consider posting

information like this on an internal website so they can always find the most up-to-date information.

Doing this helps them see that everyone is getting the same information and also fosters greater dis-

cussion and Q&A. Finally, make sure you give credit where credit is due. Identify members of your

team and those departments and user areas that helped you achieve successes. A little bit of credit shar-

ing and modesty can go a long way.

Collecting Information The flip side to sharing information is collecting it. Some information you’ll already have within IT,

such as Help Desk metrics, IT spending, system and resource statistics (response times, availability,

etc.), project status reports, etc. But other types of information you’ll have to go out and gather. Ideas

for information you can collect are:

• User satisfaction surveys. Don’t just rely on statistics from the Help Desk and your call tracking software. In addition, go out and ask users directly about the Help Desk. See how well this matches

up with the other metrics. As is often said, perception can be more important than reality. User sur-

veys can also ask users about new features, functionality, services, and so on they’d like to see from

IT. See the section “User Surveys” later in this chapter on page 280 for more information.

26710.1 Relationships with users

• Post implementation project reviews.When a project is completed, it is tempting to just move on to the next project. But you should first stop and take a moment to objectively assess how well it

went. You can use a survey format or a focus group format to ask the key participants in the project

how things went. For example: Were objectives met? Is the system functioning as expected and is it

easy to use? How did IT’s role in the project work?Were there sufficient communications? Was the

project well planned? Were there good training and documentation? For specific advice on what to

include in a Closeout Report (as reports at the end of projects are called), see the section “Writing a Closeout Report” on page 121 in Chapter 4, Project Management.

• Feedback about various IT services. Ask for comments about all IT services, such as training (a class evaluation survey, for example), the company website, and any communications to users.

Other methods of getting information include:

• Attend meetings with department heads. When you meet with key users and department heads, listen for items that may identify an opportunity. These can include challenges they are trying to

address, difficulties with existing systems and resources, changes they are expecting or trying

to implement, etc.

• Periodically follow up with individual users. Perhaps you can pick some random trouble tickets that were opened at the Help Desk and follow up with those users. Won’t they be impressed that the

manager of IT called to find out if they were satisfied with the support they received?

• Ask users for information and advice. Ask others how you are doing or if they are getting what they need from you and your department.

It is important to remember that the more information you can collect, the more valuable it is likely to

become. For example, hearing about plans from the Sales and the Customer Service department heads

individually is good. But hearing about both means you may be able to spot integration and leveraging

opportunities or see overall changes in trends and directions that may not be apparent just from one set

of plans alone.

Not only should you collect and share information, but you should encourage your team to do

the same.

Proactive Solutions Through information sharing and collecting you’ll find lots of opportunities for IT to deliver solutions.

However, an important set of solutions for you to bring are often the ones the users didn’t even know

existed or that they needed. Frequently, these can be delivered at little or no cost because they are features

that are hidden in existing solutions or inexpensive to activate/implement. These can also be enterprise-

wide solutions that no individual department or user group thought to ask for. Some examples include:

• Conference calling services. Many PBX solutions can provide limited conference calling capabil-

ities that may suffice instead of paying for an outside service.

• Proactive alerts about printer problems. Printer manufacturers have free utilities to monitor their

printers. These can alert your team (sometimes interfacing directly to your call tracking software)

about issues such as paper jams and low toner. • Virus detection alerts. In addition to alerting users when their antivirus software detects malware,

the software may also be configurable to alert IT to respond. Not only does this make IT look

268 CHAPTER 10 Working with Users

proactive, but it also ensures that the user doesn’t ignore the problem by simply closing the warning

prompt.

• Conference room reservation systems. These can be inexpensive and integrate with your calendar-

ing solution to eliminate overbooking of conference rooms. Large companies have systems devoted

solely to this function but small companies often assign rooms an Outlook user name and then

schedule them in the Calendar. • Webcasts of important meetings and announcements. These can be used for demos, training, major

initiatives, etc. They can also be easily recorded and archived for on-demand viewing.

• Implementation of toll-free numbers for mobile workers. These can be 800 numbers to your main

phone line and to your voicemail system. Not only are these convenient, but they can be far less

expensive than hotel dialing fees and cell phone roaming charges.

• Instant messaging and Web-conferencing solutions help facilitate communications with remote

workers. The growth of telecommuters has generated a whole new set of tools to facilitate workers

who work remotely and for the teams that have to support them. Being involved with remote and

telecommuting workers is a great opportunity for you and IT.

• Department and companywide intranet solutions. (Examples are discussed inChapter 11, Connec- tivity: Social Media, Handhelds, and More, on page 287). Look to automatically install the links as favorites for all users so that they don’t have to hunt for the URL.

• Have systems send out automated reports and alerts of important events. Imagine the department

head of Sales automatically getting an alert or e-mail when the sales system reports a particularly

big sale. • Upgrade of end-user tools. Look to do end-user upgrades (e.g., Microsoft Windows or Office,

updates on handheld devices) that deliver clearly visible new features and functionality to the users.

Also, make sure that there is communication about these as you do them. In addition, look beyond

the basics of tools. For example, Microsoft Office has a large volume of free add-ins for its Office

suite that can be distributed, and applications for handheld devices are growing at an incredible rate,

and many of them are free. Look for those that really seem like they’d deliver value to a large por-

tion of your user community and show the users how to use them. (Consider distributing a list of

useful free apps for phone and tablet devices and simple instructions on how to acquire them.) • Set the configurations for end users to make life easier for them. For example, are the defaults set so

that user documents are saved automatically to the network (or do they default to the local PC where

they aren’t backed up and a disk crash could spell disaster)? Is your e-mail client set to do auto-

archiving or to display message sizes so that users can easily identify those taking up the most

space? Does your directory of printers contain enough information so that users can find the

one they are looking for?

Don’t expect all your solutions to be welcomed and universally valued by all users. Somemay find new

implementations to be of no use or even annoying or burdensome. That’s okay. As long as they have

the flexibility to ignore, disable, or tweak what you’ve done they’ll be fine. Also, as you deliver these

solutions you’re giving people a sense of what IT can do, which will generate more visibility and

understanding. If you implement an alert for big sales in the Sales system, the head of manufacturing

may ask you about implementing an alert when his area exceeds a quota or, after implementing a con-

ference room reservation system, the head of audio-visual may ask you about expanding that to reserve/

track those portable projectors.

26910.1 Relationships with users

Being Flexible Most organizations have adopted certain IT standards to drive efficiency of support, which can make a

great deal of sense. Organizations will standardize on a certain vendor for their computers, oftentimes

picking one product line, or even one model. They will standardize on desktop images, software

versions, printer types, naming conventions, and so on.

Along these lines, organizations may also “lock down” the desktop environment so that users are

limited in what they can do (e.g., users don’t have permission to install software). Such restrictions can

address security and licensing concerns and reduce calls to the Help Desk if a user runs into trouble.

However, it is important not to take standards so far that they end up getting in the way of what your

users need to do or are the catalyst for an adversarial relationship. For example, if you do lock down the

desktop environment, consider giving the users some flexibility to choose their own wallpaper, colors,

screen savers, etc. Allowing users to have pictures of their kids, pets, or favorite sports team for their

desktop background can go a long way.

Similarly, some flexibility of technical standards is called for. In some cases, the bigger concern

about exceptions to technical standards is not the impact on IT’s support, but the concern that other

users will take note and want to “keep up with the Joneses” (sometimes referred to as “technology

envy”). So when you have standards, make sure you are clear to yourself as to why you have them.

After all, it causes little impact to IT if some users have different keyboards/mice, monitors, or even

slightly different hardware specifications (such as memory, hard disk size, processor). In the end, many

of these items are fairly meaningless in the scope of the bigger picture of what the IT role is. See more

discussion on this topic in the section “Standards” inChapter 7, Getting Started with the Technical Environment on page 199.

Nonetheless, having some standards is important. As data moves all over the place, and the ques- tions become what the user’s hardware is and what the company’s hardware is, you can get into some

awkward situations quickly. Never mind the complexities involved when an employee is fired from the

company—let’s just stick with the “simple” issues of what your department will support. Without some

standards, things get sticky fast. See the section “The Consumerization of IT” , on page 271 later in this chapter and Chapter 11, Connectivity: Social Media, Handhelds, and More on page 287 for a fuller discussion of these issues.

User Training There are many options available for user training, as well as training for your staff. The ones you

choose to use depend on the size and budget of your organization, as well as the skills you need to

develop in your users.

In-House Classes If you’re able to have your own training staff and facilities, you can tailor course content, schedule, and

class size exactly to your needs. The costs are readily identifiable in terms of staff and equipment

needed for the training room.

Third-Party Training Providers These organizations can provide quality training in popular skill sets. Alternatively, you can usually

arrange (at an additional charge) for these providers to deliver classes customized to your needs. Train-

ing providers usually have a staff of professional and highly experienced trainers, and the curricula for

270 CHAPTER 10 Working with Users

many classes usually adhere to outlines established by the appropriate vendor (e.g., Microsoft) to

maintain their authorizations.

Web-Based Training Web-based training has exploded in recent years; “e-learning” is now a standard—not unusual—

offering for many training needs. Web training can be a recorded session or it can be conducted live

and interactive so that attendees can ask questions. Similarly, many vendors offer short videos on spe-

cific application functions, features, and tasks. There are many different varieties of Web training that

you can customize to your particular staffing and budget needs, and there are many companies that now

either develop their own Web-based training (because the tools are so easy to use) or have a company

develop courses just for their needs.

User Education and Awareness In addition to formal training about new solutions, you’ll also have to educate users about new policies,

new features, changes in procedures, and so on. These can be accomplished through information com-

munications like a newsletter or an in-house company portal. Keep in mind that when you are trying to

change user behavior and habits, it will probably require repetition of the message. For example, since

the user can be the weakest link for data security, it makes sense to have security become an ongoing

theme as opposed to a one-time message.

10.2 THE CONSUMERIZATION OF IT Traditionally, IT has defined the direction, path, and strategy of the solutions that are to be used and

deployed. However, that has dramatically changed as users have started to tell (if not demand) IT which

devices and applications that they want to use. While this shift may have started a while ago as com-

puters became a common device to find in the home, it became an issue that could not be ignored as

smart phones became popular, particularly with the release of Apple’s first iPhone in 2007.Welcome to

the consumerization of IT.

Consumerization of IT is a result of:

• The increase in availability and choices of new technology solutions for the consumer, along with

• The realization by these same consumers that these new products would not only be useful to them

in their personal life, but in their corporate life as well.

On top of that, while most IT departments go through a lengthy process to evaluate and test technol-

ogies, invest in proper management and control, and analyze the ROI (return on investment), many

consumers seem to be willing to be more flexible and to make technology purchases with a great less

concern. As a result, it’s not uncommon for corporate employees to say that they have a better PC at

home than they do in the office. This is probably a result of the powers-that-be (very often Finance and

IT) deciding that the useful life of a workstation is 3 to 4 years, while an individual consumer may be

perfectly willing to invest $500 to $1000 when they feel it’s time for a new PC at home.

As devices for the consumer became more and more functional, users began telling IT that they

didn’t want to wait weeks for bureaucratic red tape to get a device that wasn’t nearly as useful as

the device they could get today from the store down the street.

27110.2 The consumerization of IT

How to Deal with Consumerization Unless you have a very rigid organization, with backing from the highest level of management, you’re

unlikely to successfully stem the tide of the consumerization of IT in your company. Failure to recog-

nize the issue is likely to result in users seeing your department as out-of-touch and they will just go

around your group to get what they want. And, since many requests for consumer devices may be com-

ing from your senior executives, it’s best to adopt a policy of flexibility. The following exchange may

be apocryphal, but is probably familiar to some degree:

Help Desk Analyst: Thank you for calling the Help Desk, how can I help you? Executive Vice President: I’m having difficulty setting up my iPhone to access company e-mail. Help Desk Analyst: We don’t support the iPhone. Executive Vice President: You do now.

While there are plenty of areas where IT needs to stand firm in its selections and policies, there are also

areas where there is little risk with showing a little flexibility. Consider some of these areas:

• Desktop devices.While ITmay have selected a specific vendor and model, is there really an issue if a user requests a slightly bigger screen?

• Laptop devices. Similar to desktop, but be sure that you’re offering a sufficient choice of models. While some users prefer a fully featured device, others may prefer a smaller, lighter model. If your

vendor doesn’t offer a sufficient range of choices, or you’re not making them available to your

users, you may want to rethink your position.

• Software. While IT plays a role in selecting, implementing, and supporting the large enterprise applications (messaging, finance, human resources, etc.) there are many individual users or depart-

ments that can benefit from small/inexpensive packages. Do you really mind if the sales reps use

their own app to find the best deals on hotels when they travel?

Support Issues Associated with Consumerization and Handheld Devices • Accessories. Sometimes a user will want a special keyboard (e.g., ergonomic, wireless), a track-

ball instead of a mouse, or a webcam. Even if you think the business justification is questionable,

there is really little reason to turn down the request. As long as there is budget approval (devices

like these are usually $100 or less), you have more to gain than to lose by taking care of requests

like this. • Policies. When it comes to formal corporate policies, they are often developed with very

good intentions in mind and then never updated or reviewed. If you’re are turning down requests

simply because “that’s what the policy says” then perhaps it may be time to take another look at

those policies to see if they need to be updated to reflect the real world and how people actually

work today.

• Handheld devices (mobile phones and tablets).Aside from the choice of devices you make avail- able to your employees, it’s important to consider that many (if not most) of your employees may

already have their own devices and all they want to do is connect to the corporate network so

that they can be more productive by doing company work on their own time after hours. See

Chapter 11, Connectivity: Social Media, Handhelds, and More on page 287 for more on the support issues for phones and tablets.

272 CHAPTER 10 Working with Users

There are a number of issues associated with support as consumerization grows:

Depth and Breadth of Support With so many choices of these devices from different carriers, different manufacturers, and running

different operating systems, it would be impossible for an IT department to be able to develop sufficient

proficiency with them to provide support. However, you may have to wonder if many users are actually

expecting the IT team to be proficient with them. Nowadays, most users are fairly self-sufficient about

these devices. They know what functionality their devices have, and how to try and locate those func-

tions themselves without having to call the Help Desk. They also go to the Web, their colleagues, and

the carrier or manufacturer support lines for help. Some of them even turn to their teenage children

when they have a question. So, the number of questions that may come to your team could be fairly

limited. Of course, there are users that also expect and demand a much higher degree of attention,

support, and hand-holding.

Security Of course security is a major concern, especially with mobile devices. Initially this was a challenge

because the devices were targeted to individual consumers, and the devices had little (if any) capability

for management by the enterprise. This has begun to change as additional features that allow for greater

enterprise integration have been included. Instead of saying a particular device is or isn’t secure, you

can just define a set of requirements that devices must have to be allowed on your network. This might

include features like the ability to remotely wipe the device, or for the device to have a password,

among others.

Costs The real expense of mobile devices is the recurring monthly plan costs. The upfront cost for the device

is a pretty small portion of the total cost of ownership (TCO). (For a full discussion of TCO, see

Chapter 7, Getting Started with the Technical Environment on page 189.) Therefore, when you look at a 12- or 24-month timeframe, the total cost differences between device X and device Y

may not be that much. And if the employee wants to use their own device, there may not be any cost

to the company.

Bring Your Own (BYO) Policies Some companies have started to embrace a Bring Your Own (BYO) policy when it comes to certain

technologies. With a BYO policy, employees bring their own technology products to work. This is

most often done with mobile devices, but some organizations have also used the program for laptops.

There are a number of variations of BYO. In some cases employees are reimbursed for a portion of the

upfront costs, and/or the recurring fees. There are usually certain restrictions and provisions related to

security, liability, company data, and so on. If you go down this path (and it seems like more and more

companies are) there should be a number of departments engaged in setting up the policy, the guide-

lines, etc. These include IT, Human Resources, Finance and Risk Management, maybe even Legal.

For more information about BYO, see section “The Blurry Line between Company-Owned and Personally-Owned Equipment” inChapter 11, Connectivity: SocialMedia, Handhelds, andMore on page 288.

27310.2 The consumerization of IT

10.3 WHEN YOUR USERS ARE PART OF A MOBILE WORK FORCE Many users now spend some portion of their work day on a mobile device of some kind. That sounds

commonplace, but it is actually a big shift in the way work gets done. It has large consequences for

society as a whole, and for IT in particular.

As an IT Manager, here are some perceptions you will face:

• It is not that hard to deal with information technology issues anymore, because everything is on

much smaller and easier-to-use machines. (Those guys back in the mainframe days had it really

rough—their computers were huge!)

• How hard could it be to move stuff to where we can use it on our cell phone? All you have to do is

cut and paste. Or download the app. • Why doesn’t the company help me with my broken phone? I bought it with my own money, but I

read my company e-mail on it. • Not only are there security and support issues, there are “workplace sociology” issues.

In the past, it was only the traveling sales reps who carried your company’s valuable data outside your

building—and you fought hard to prevent even that. Now everyone has a mobile phone and everyone

carries all kinds of important data around.

Techniques for Supporting Your Mobile Users Chapter 11, Connectivity: Social Media, Handhelds, andMore on page 287 is dedicated to the gen- eral issues of mobility. But there are a number of ways to facilitate support when your users are not in

the office:

• Configure your e-mail client to allow users to read andwrite e-mail messages when not connected to

the server.

• Use features of the operating system, or system utilities, to synchronize files so that files on network

drives can be replicated to laptops for accessing when offline.

• Remote control capabilities (a feature of many desktop management suites) can ease the burden of

trying to troubleshoot and solve a problem over the phone.

• If you automatically deploy software, configure your deployment tool to deploy to workstations

only when they are locally connected (especially if you are pushing out very large updates).

Otherwise, for a user on a wireless connection in a hotel room, it could take hours and prevent

her from doing her work.

• When testing new tools, applications, features, and such, take into consideration how they will work

for a user outside the office with limited or no connectivity. Consider first deploying these items to

in-house users before deploying them to mobile users.

• Be flexible about communication methods. Depending on their location and circumstances at

the moment, it can be more convenient for mobile users to contact you by text message, e-mail,

telephone, IM, etc. This also means there could be extended periods when you don’t hear back from

the user. Be adaptable. • Keep a ready supply of accessories for traveling users: power cords, USB flash drives, power

adapters for different countries, etc. Be prepared for frantic calls for these items right before a user

is about to leave the office, and don’t expect the items to be returned to your inventory.

274 CHAPTER 10 Working with Users

• Be sure to provide ample communications to your users about downtime, maintenance activities,

upgrades, etc., and keep in mind that your mobile users may be in very different time zones. You

may even want to have communications that are tailored to the mobile workforce.

• Mobile users often discover that small utilities or accessories can make their lives radically easier.

Sometimes they hear about these while chatting at a conference, read about them in an airline

magazine, or see the guy in the next seat using one. Be flexible in allowing them to use tools that

are not on your approved standards list. See the section “Being Flexible” earlier in this chapter, as well as the section “Standards” inChapter 7, Getting Started with the Technical Environment on page 199.

• Encourage your mobile users to report back to you on the things that work best and worst for them.

Focus on addressing the items that work worst, and making sure that all users are aware of the things

that work best. • Look to your software vendors for your most used in-house applications and see if they have a

version to run on handheld platforms.

10.4 THE HELP DESK Whether it goes by the name of Help Desk, Support Center, User Services, or a variety of other names,

your IT department needs some kind of support organization to provide assistance to your user

population—employees, clients, customers, or business partners.

In general, IT Help Desks are designed to be one-stop shopping for all computer-related requests.

For many users, your support organization is the only interaction they will have with IT. For these users,

the IT department is only as good as their last call to the Help Desk. Managing a Help Desk well is a

difficult task but a task with key specific rewards:

• The company will be able to see a visible portion of IT’s efforts. Installing a new storage area network isn’t a trivial task, but users are generally only aware of results they can see; they see a

whole new range of applications and features but generally don’t go and check out the shiny

new hardware that you came in on the weekend to configure. • You get to help people. IT departments in general, and Help Desks in particular, are service

centers. • Awell-run Help Desk can collect a multitude of data and metrics.You will then be able to more

clearly and concretely justify your need for manpower, budget, training, hardware, software—the

types of resources you need—when budget time rolls around. You can quantify the Help Desk’s

performance and how, for example, you can use the fact that it took, on average, 15 minutes to

answer incoming calls to justify the hiring of three new analysts. In some cases, that data can

be shared with various department heads so that they can identify how systems are being used,

where training is needed, etc. • You get insight into the entire company. IT’s support staff works with virtually every level of the

company, from the loading dock to the CEO’s office. If building key relationships is one of your

goals (and as an IT manager, it should be), you can’t ask for a better opportunity than running a

Help Desk.

27510.4 The Help Desk

Typical Help Desk Activities A Help Desk’s responsibilities can include:

• Requests for new equipment

• Password resets

• Providing users with documentation and Web links

• Requests for new IDs and setting up new employees

• Coordinating the process and activities related to a new hire • Managing computer supplies (toner, DVDs, flash drives) • Installation and move requests • Taking the appropriate steps when an employee leaves the organization—recovering equipment,

disabling accounts, etc.

• Scheduling training

• Tracking each request to make sure that it doesn’t fall into a black hole and that someone always has

ownership

• Generating reports for management on the types and volume of calls • Keeping current databases of users, inventory, etc. • Routing and coordinating requests with other IT groups (application development, operations,

networking, etc.)

• Maintaining a knowledge base of fixes and resolutions so that repeat problems can be addressed

more quickly

• Providing application support

• Reporting and resolving hardware problems

• Helping remote users with connectivity issues

Procedures Analysts at the Help Desk need clear procedures for handling different call types. They should know

how to route different types of calls, how to escalate, when to follow up, and so on. These procedures

should include detailed contact information of various internal and external resources. If your company

offers 24/7 support, contact information should include times when personnel from other departments

will be available. Call tracking software, intranets, and so on, can aid in ensuring that procedures are

followed. These procedures should also be shared with other departments within the company.

Escalating a Call Escalating calls that are beyond the skills or authority of your Help Desk personnel is an important part

of the Help Desk’s function and process.

Escalating a call occurs when an issue is too complex for first-level support. Many companies have

several levels of support designed to have correctly skilled people taking the right calls. You don’t want

your very technical people answering simple calls about how to use Windows, nor do you want your

first-level personnel addressing system architecture calls.

Typically, Help Desks have three levels of support: Tier 1, Tier 2, and Tier 3. Some have Tier 4.

Each company defines the tiers to match their own processes, but the concept is the same: simple

276 CHAPTER 10 Working with Users

requests (password resets, etc.) are handled by Tier 1 and then the severity/complexity of the problem

determines how far up the structure the problem is taken.

A call can also be escalated when the customer has an issue whose resolution requires more author-

ity than the Help Desk person has. Approving a nonstandard request or addressing a security concern is

an example of an issue a person further up the Help Desk ladder generally deals with. Similarly, a call

may be escalated when the ticket has been open too long, as defined by the SLAs, or when the user is a

VIP and should be getting extra attention.

In both types of situations, clear policies should be put in place so that personnel can knowwhen and

how to re-route the calls.

Access The more a Help Desk analyst can do, the more effective she’ll be and the more likely she’ll be able to

resolve a problem on that initial call. Consider giving your analysts various degrees of administrative

access so that they can reset passwords, edit e-mail distribution lists, change access levels, see users’

files or data, etc. Of course, this type of access has to be carefully considered first before it’s granted.

Analysts should be made aware of the capabilities they have and warned about the privileges they

have—that it must not be abused. They also need to be aware that special access means they can cause

problems as easily as they can solve problems.

Various tools from software vendors allow you to delegate specific administrative tasks to the sup-

port staff without giving them the “keys to the kingdom.”

Self-Service Today, every service-based organization is looking to allow its customer to perform some basic func-

tions on their own (e.g., tracking their package at www.fedex.com) to avoid tying up support staff resources. The same expectations are true for Help Desk organizations.

IT has started to embrace and incorporate some self-service ideas to address Help Desk-type user

needs. These self-service tools can be particularly helpful for those Help Desks that aren’t staffed 24/7.

Some common self-service techniques that have been put into place include:

• E-mailing requests to the Help Desk instead of talking to an analyst on the phone, or entering the

request via an online portal

• Allowing users to see the status of their tickets

• Setting up knowledge bases for users to browse through on their own • Setting up online forms for common requests (supplies, moves, etc.) • Resetting their own password (although this is commonly implemented, there are security concerns

that you should consider) • Allowing users to see what messages have been identified as spam if they are trying to track down

an e-mail that hasn’t been delivered

• Online forms to request file restores; these are then passed on to the backup software and the files

can be restored without human intervention if the tape library has the proper tapes

As in other aspects of our society, some people are more comfortable with self-service, as it allows

them to feel that they have more control and involvement. Others demand as much personal interaction

27710.4 The Help Desk

as they can get. Self-service options shouldn’t be considered as a wholesale replacement for personal

interaction or other existing methods. Instead, self-service should be thought of as one more tool in

your toolbox.

Tools Help Desk tools come in all shapes and sizes—www.helpdesk.com lists hundreds of different Help Desk software applications. Some common categories of tools include the following:

Call Tracking Software Call tracking is a software category designed specifically for managing calls at call centers; this cat-

egory includes more areas than just traditional corporate IT Help Desks. Prices range from free open

source call tracking solutions to those that cost a few hundred thousand dollars. Because most offerings

are licensed based on the number of concurrent users, however, the size of your staff may be the great-

est factor in determining how much your implementation will cost.

In many companies, a user is required to go to a specificWeb page to fill out an online form (usually

referred to as a “trouble ticket”) to request assistance. Initially users resisted this process—many com-

panies require a ticket for every task, including mundane tasks such as new paper for the network

printer—but as the breadth and size of IT functions have increased, so has its need to be more formal-

ized about handling the workload. Precisely in the same way that you as a project manager for your

department should avoid “scope creep” (for a discussion, see the section “Clearly Define the Project’s Objective and Scope to Avoid ‘Scope Creep’” on page 106 in Chapter 4, Project Management), you need to carefully manage and track the Help Desk’s activities and resources.

It is important that you educate users on the need to submit a ticket. Call centers and Help Desks can

become overwhelmed quickly. One user’s “simple” request (“I just need access to the high-speed color

printer this one time”) can balloon into work overload (four users in one afternoon each asking one tech

for a different favor “just this once”) or can distract from a more important function (the backup did not

run correctly and needs to be rerun).

Trouble tickets also provide not only traceability but documentation. Once a user submits a ticket

requesting a particular action, his request has been put in writing. Because the request can be tracked by

both the user and the call center, any further issues can be documented (“I asked for a new laptop six

weeks ago.” “No, actually, you asked for it two weeks ago and the update on the ticket says it will be

here Friday.”) For a more complete discussion of this topic, see the section “Measuring the Help Desk Workload” on page 281 later in this chapter.

Also, all that work that was performed invisibly now gets shown under the spotlight of automatic

record keeping. Trouble-ticket software allows you to tell the company that not only did your depart-

ment upgrade everyone’s mobile phones and went to four client site problems, you also reset 37 pass-

words, replaced three stolen laptops, moved 15 users, handled 15 file-restore requests, etc.

Regardless of how a user contacts the Help Desk—phone, e-mail, or website—each contact is given

a ticket number. All contacts are entered by Help Desk personnel into a tracking system that generates a

ticket number for each item. The user is then given that number; both the caller and the Help Desk can

then use it to reference the particular problem.

Because there are a surprisingly large number of offerings in this product area, a good resource to

start narrowing your search is HDI, formerly known as the Help Desk Institute, (www.thinkhdi.com).

278 CHAPTER 10 Working with Users

This organization, which you may want to consider joining to keep abreast of developments in the area

of support services, can be a good resource to learn about call tracking software offerings and other

aspects of Help Desk operations. There are a variety of factors to consider when evaluating this

category of software:

• Ease of customization. Some packages can be customized using a point-and-click type interface,

whereas others require scripting.

• Client, server, and database platforms supported. • Auto-escalation (e-mail, cell phone, alerting management, etc.). • Integration with your e-mail environment. • Ad hoc queries and reports; the ability to define and generate customized reports.

• Integration with handheld devices to allow technicians to view/update tickets while away from their

desks.

• Access from a web browser. This could be helpful for technicians who work from non-supported

platforms (e.g., Macintosh or Linux) or allow technicians to access the database from any work-

station without having to install the full client software package. • Integration with third-party desktop management tools. • Integration with third-party knowledge base packages. • Ability to build an internal knowledge base of calls.

• Support for international use. If your organization will use the package in countries outside the

United States, you may want to make sure that the package can be configured for multi-language

support and that the vendor has a presence in the countries you will be operating in.

• How usable the package is out of the box. You may not have the resources available to dedicate for

customizing the package to your exact needs. • Extent of the implementation effort in terms of time, training, and need for consultants.

Selecting a Call Tracking package is a critical decision, as you will be using it for several years. In

addition to the standard practices of checking references, investigating the vendor, and so on, you

should also consider getting input from some (if not all) of the staff that will be using the package.

You may want to solicit their assistance in narrowing down the field of candidates to a few finalists.

Also, when you’re down to deciding among the last two or three vendors, you should have some of the

staff sit in on the vendor demos so that they can see how the packages operate and can ask questions.

Knowledge Base Since no Help Desk analyst can be expected to know everything, a knowledge base of information can

be a valuable resource. This might be something developed internally, or part of a call tracking system

or an external resource. Most call tracking packages allow you to build a knowledge base for resolu-

tions, but this requires that analysts at the Help Desk carefully enter comprehensive information and

details about each call’s resolution. Many vendors have a knowledge base function on their website,

along with user forums. Both are great for finding solutions.

Remote Control Very often an issue may go unresolved during the initial phone call because the user was unable to

describe the problem accurately or couldn’t follow directions provided by the Help Desk analyst. Using

a remote control package (e.g., PC Anywhere from Symantec, SCCM from Microsoft, TeamViewer,

27910.4 The Help Desk

Remote Control from Dameware), a Help Desk analyst can see exactly what the user sees on their PC

and even take control of the user’s PC, all without ever leaving the Help Desk chair. (Of course, the

support staff should always ask for the user’s permission before accessing their workstation in this

way.) This remote control access saves time, increases user satisfaction, and improves the effectiveness

of the Help Desk tremendously.

Desktop Management Many calls to the Help Desk result in a request for some type of installation (printer drivers, new soft-

ware, upgrades, patches, etc.). By using various software tools, for example, remote control mentioned

earlier, as well as solutions for the automatic deployment of software, the Help Desk can fulfill a

request without having to dispatch a technician or walk a user through a complicated process. Desktop

management tools can also automatically inventory users’ hardware and software, note changes in con-

figurations, and so on. Tools in the space include SCCM fromMicrosoft, Casper from JAMF (for Macs

only), Altiris from Symantec, and LANdesk.

User Surveys While reports from your Help Desk phone system and call tracking software can give you all kinds of

statistics, they often don’t tell you if your customers are satisfied. It can be very helpful to periodically

survey a sample of users who have called your Help Desk and ask them a small handful of questions.

The survey can be done in person, over the phone, or via e-mail or the Web. Simple, free survey

tools such as www.surveymonkey.com or www.zoomerang.com are great for this. A sample survey might include questions such as:

• How was your initial call to the Help Desk answered: by a person, by voicemail, or by e-mail?

• If your request was submitted by e-mail or by voicemail, how long was it before you received a

response? • How long did it take before your problem was completely resolved? • Did it require multiple visits to your desk or multiple phone calls to resolve your problem? • Did the analysts who worked to resolve your call act in a professional and courteous manner?

• Overall, how would you rate this specific call to the Help Desk (using a scale of 1 to 10, with 10

being perfect)?

• Please feel free to make any additional comments, complaints, or suggestions you may have regard-

ing the Help Desk.

You may find that a survey yields very different numbers than the statistics you get from other tools.

Your call tracking software may report that the average call is resolved in 3.2 hours. However, the user

survey may indicate that the average is 4.5 hours. Even if the call tracking statistics are more accurate,

as a manager it is often more important to deal with the perception. Regardless of the results, the act of taking the survey will help users believe that you’re concerned about the quality of service being

delivered. After each survey, statistics should be compiled and decisions made about what the results

indicate, and what actions should be taken to improve service levels. Include your team in these dis-

cussions. When you do surveys periodically, you can then evaluate trends and patterns.

280 CHAPTER 10 Working with Users

Measuring the Help Desk Workload Tracking the performance of your Help Desk is important because, as discussed earlier, this department

is often the only face of the IT department that the rest of the organization knows. Within most call

tracking applications, tools exist to monitor typical Help Desk activities. You can track:

• Service ticket submissions

• Service ticket categorization

• Response and resolution times • Activities by technician (volume of tickets, resolution time, etc.) • Busy periods (by hour, day, month) • Service tickets due and completed

• Volume of calls in different categories (e.g., password resets, hardware, software)

• Service ticket billing (if you chargeback for services)

• Reporting and performance charts

• Billable time/expense tracking

• E-mail ticket volume

Staffing It’s important to remember that a Help Desk is essentially a complaint desk—people only call when there is a problem. As such, callers to the Help Desk are likely to be frustrated and impatient.

Accordingly, one of the most vital prerequisites for Help Desk analysts is their interpersonal skills.

The staff on the Help Desk has to be sensitive to callers’ needs; remain calm, mature, polite, profes-

sional, and demonstrate confidence. The last item is of particular importance. If a caller to the Help

Desk feels that the analyst isn’t qualified or capable, the caller is likely to become more frustrated.

On the other hand, if the caller believes (whether it’s true or not) that the analyst is confident and

capable of finding a resolution, the caller will immediately feel better. Confidence is contagious.

A user is likely to appreciate and value a quick, courteous, and helpful response to a basic support

question more than they would appreciate major upgrades and investments to your infrastructure.

A friendly voice helping a road warrior through a hotel connectivity issue (which helps only one

person) will usually generate more goodwill than an operating system upgrade to a file and print server

(which helps the whole company). Both are required for a successful organization, but the former may

be more appreciated than the latter.

In addition to interpersonal skills, individuals at the Help Desk need to have skills in whichever

technologies they’re supporting. Since you’re unlikely to find someone who knows everything, it’s

important that they’re also resourceful enough to find solutions to problems they haven’t seen before,

and be able to think through problems and explore alternatives on their own.

Specific Considerations When Hiring for a Help Desk Chapter 3, Staffing Your IT Team on page 65, covers staffing and recruiting in detail, but when hiring for a Help Desk, you should especially consider how they perform in a telephone screening. This

call should give you some feel for the candidates’ telephone personality.

Develop a set of representative questions that might come into the Help Desk, and see how the

candidate handles them. The questions should be ones that don’t draw on technical skills exclusively,

28110.4 The Help Desk

but also allow you to get a glimpse as to how the candidate thinks through troubleshooting and how she

reacts when the answers aren’t clear-cut.

• Look for evidence that the candidate can learn on his own. Have all his technical skills been

developed through formal training or self-taught?

• Is the candidate prepared for full shifts answering phones?

• If the candidate sees the Help Desk as a stepping stone to a higher level position in IT, you and she

should agree on a minimum time commitment at the Help Desk before such a transfer is possible.

Note that if such a goal is not realistic—some companies have no direct route from this job to any

other, either for geographical or other reasons—make sure you mention that right away. It could be

a deal breaker, for you or the candidate. And there is no sense in wasting anyone’s time.

Size of Support Staff Howmany people you need supporting your Help Desk depends on the number of calls that come in dur-

ing a given period, your service level targets, average length of each call, and so on. A Help Desk that has

multiple shifts will obviously need more analysts than one that runs just a single shift. You’ll probably

need to be flexible in your staffing: you’ll want more analysts during peak periods and fewer during quiet

periods. Statistics from your ACD and your call tracking software can help you evaluate call patterns.

Taking calls at the Help Desk for eight hours a day can be exhausting and may be a short path to

quick burnout. Consider rotation of assignments with other positions or schedule shifts so that each

analyst has some time away from the phone, perhaps to research questions that might normally

have been escalated to some sort of second level. The section “Avoid Burnout in Your Employees” in Chapter 2, Managing Your IT Team on page 35 addresses staff fatigue in more detail.

Staff Training Ongoing training for your staff is critical to the success of your Help Desk. In addition to the obvious

training of applications, there are a number of training ideas you may want to incorporate:

• Training on IT policies and procedures. When the staff is familiar with the policies, they’re more

likely to apply them consistently.

• Training from other IT teams (systems development, networking, etc.) on what those teams do and

how they interact with each other, the Help Desk, and the users.

• Discussions with vendors: innovative ways to use their products, for example, or in-depth training

on particular features.

• Training on trends in the industry; this could be a discussion you lead based on headlines in trade

journals. • Training on security issues; this discussion could be led by your internal networking team and could

be a great way to inform your team about “social engineering,” new vulnerabilities and viruses, and

how to be on the lookout for them.

• Sharing knowledge with other Help Desk members; if one member encounters an unusual question

or problem from a user, have the member share both the problem and its resolution with the team.

This could be a great idea for regular team meetings.

Remember that training is an ongoing process. Periodic refresher courses are just as important as the

initial training.

282 CHAPTER 10 Working with Users

10.5 SERVICE LEVEL AGREEMENTS When a user calls the Help Desk, they’re hoping for immediate service and resolution. Of course, that

may not be possible in all cases; a technician may have to be dispatched, it may be a problem that has to

be researched or escalated to a specialist, and so on. If it’s a hardware problem, a part may need to be

ordered. When this happens, the user will usually ask, “How long will it take?” Service level agree-

ments (SLAs) give you—and them—the answer to that question. SLAs are your targets for delivering

service. There are many different types of SLAs:

• System uptime

• Hours of Help Desk operation

• How many rings before a phone is answered, or how long before a voice mail message is returned • Time until call resolution • Turnaround time for different types of tasks such as

• Creating an ID

• Restoring a file

• A password reset

• Break/fix repairs

• Obtaining new hardware

• Installations and/or moves

This list is just a short sample of SLAs specific to the Help Desk function. However, comparable SLAs

can be set for all the systems and resources that IT provides.

Positive Values of SLAs If you’ve never had SLAs, the process of just defining themmay actually improve service—after all it’s

a lot easier for your staff to hit a target once they know there is a target. By defining and publishing your

SLAs, you can help reduce anger and frustration—yours as well as the users. For example, if you tell

users that it takes 24 hours to create an ID, you are likely to get users in the habit of requesting them in

advance versus those emergency requests that come on Monday mornings because HR never informed

IT about the new hires.

There will always be exceptions, emergencies, and special cases, but published service levels can be

an enormous help in keeping a support organization from constantly operating in crisis mode. Of

course, it’s important that the service levels you set be ones that you can meet and that are reasonable

for the user community. For example, don’t tell users that e-mails will be responded to within one hour

unless you have a very high degree of confidence that you can do so consistently. However, promising

to respond to an e-mail within a week may be a target that you can meet, but one that your users are

likely to find unacceptable.

Ask for Help from Your Staff When setting service levels, solicit input from your support staff, as well as users, as to what is rea-

sonable and what is feasible. Then, before publishing your service levels, have your staff work with

them for a while to see how well they meet them. Once you’re confident you have service levels that

28310.5 Service level agreements

are both reasonable and feasible, let the users know. Post them on your intranet or send a company-wide

e-mail. Afterward, monitor how well you’re meeting them. They aren’t carved in stone. It’s okay to

adjust them if they aren’t working, and you may need to add to them as your support organization takes

on additional responsibilities or types of services.

Writing Good SLAs Good SLAs have several things in common:

• The levels of service should be specific and clearly defined (e.g., write “remote access to the

database shall have 99.99 percent availability M–F, 8 AM–5 PM,” not “the database will be available

during normal business hours”). • SLAs should be written for the most requested tasks first. • SLAs should be defined in such a way that measuring their performance is relatively easy, and,

preferably, can be automated.

• SLAs should be written clearly so that they are understood by all. They should be focused onmetrics

that have meaning for the customer. Your customers may not be interested in a router’s uptime, but

they are interested in the reliability of Internet access.

• Consider SLAs for end-to-end tasks, as opposed to individual components. For example, consider

the availability of the finance application to the end user, as opposed to individual SLAs for the

network, the server, the database, the application, etc.

10.6 Further References Websites www.altiris.com (desktop management software). www.bmc.com/remedy (Help Desk software vendor). www.dameware.com (remote control software). www.e11online.com (Help Desk software vendor). www.helpdesk.com (Help Desk support). www.helpdeskpro.net (Help Desk software vendor). www.help-desk-world.com (Help Desk resources portal). crm.ittoolbox.com (CRM site). www.landesk.com (desktop management software). www.microsoft.com/sccm (desktop management software). www.numarasoftware.com (Help Desk software vendor). www.pcanywhere.com (remote control software). www.surveymonkey.com (survey tool). www.teamviewer.com (remote control software). www.thinkhdi.com (Help Desk Institute). www.zoomerang.com (survey tool).

Books and Articles Beisse, F., 2009. A Guide to Computer User Support for Help Desk and Support Specialists. Course Technology.

Blokdijk, G., 2008. Help Desk 100 Success Secrets—Help Desk Need to Know Topics Covering Help Desk Jobs,

Help Desk Software, Computer Help Desk, Help Desk Support, Help Desk Jobs, IT Help Desk andMuchMore.

Emereo Pty Ltd.

284 CHAPTER 10 Working with Users

Gerbyshak, P., Brooks, J., 2009. Help Desk Manager’s Crash Course. Booksurge.

Greengard, S., 2011. Managing a Multigenerational Workforce. CIO Insight Magazine May/June.

Jaffe, B.D., 1998. Taking the Measure of Customer Service. PC Week June 5.

Jaffe, B.D., 2000. Maturity Is a Help Desk Prerequisite. PC Week February 7.

Johnson, M., 2011. IT Service Desk: What You Need to Know for It Operations Management. Emereo Pty Ltd.

Knapp, D., 2009. A Guide to Service Desk Concepts: Service Desk and the IT Infrastructure Library. Course

Technology.

Orand, B., 2010. Foundations of IT Service Management: The ITIL Foundations Course in a Book. CreateSpace.

Preston, R., 2011. Consumerization of IT Is No Fad. Information Week June 27.

Violino, B., 2011. Workers without Borders. Baseline Magazine July/August.

28510.6 Further references

CHAPTER

Connectivity: Social Media, Handhelds, and More 11

“One more thing . . . ”

Steve Jobs

CHAPTER TABLE OF CONTENTS

11.1 Get in Front of the Curve ..............................................................................................................288

11.2 The Power of All These Connections.............................................................................................293

11.3 How Does This Affect You as IT Manager? ....................................................................................298

11.4 Further References ......................................................................................................................302

The workplace, and the entire world, for that matter, is more tightly integrated than it ever has been.

You and your employees can be connected 24/7/365 to your customers, fellow employees, former col-

leagues, long-forgotten friends and relatives, and to your offices across the globe. You are connected to

a lot of people almost all the time.

That is both good news and bad news. We’ll examine both sides of the issues in this chapter as we

discuss the various ways today’s technologies allow unprecedented interaction among people—your

users, suppliers, clients, customers, vendors, and you—often the facilitator for many of these electronic

connections.

This chapter discusses new technologies and the significant impact they are having on users, your

staff, your company, and the ways they live and work. It discusses the benefits and challenges of some

technologies, but more to the point, it talks about how you should be dealing with them as an IT man-

ager, and what your role is.

No organization, no matter how systematically they try to avoid this issue, can elude the giant wave

of mobility. Nor should you try. In previous chapters, the guidance has been to provide careful, mea-

sured approaches. In this chapter you’ll see that the guidance is toward more flexibility and adaptabil-

ity, and not being afraid to fail.

Instead of pretending you have a choice in the matter, we are going to provide you with some ideas

on how to deal with it.

IT Manager’s Handbook.

© 2012 William Holtsnider & Brian D. Jaffe. Published by Elsevier, Inc. All rights reserved. 287

• Embrace it. Like the old IT departments fighting the infiltration of PCs back in the 1980s, you are facing a losing battle. You know all about the inevitability of the march of technology—why are

you still pretending like smart phones are not something that the IT department has to be concerned

with? See the section “Get in Front of the Curve” on page 288. • See how other people are handling this issue. For a long time, many IT managers knew exactly

how many “computers” were in their environment. They had servers and laptops and a discrete

number of software licenses to manage. Now all kinds of computational devices with all kinds

of capabilities are being carried into the environment, sometimes through the “back door.” And

these “computers” are being used in ways no one would have guessed just a few years ago. Like

any complex problem, your first step is to define the scope of issue: just exactly what exists and how

they are being used. See the section “The Power of All of These Connections” on page 293. • Figure out exactly what (hardware and software) is being used and how and what you’ll let

into your system. Like the other technologies you deal with daily, there are good ones, medium quality ones, and truly awful ones. Just because a user loves a new tablet’s touch-and-feel doesn’t

mean you have to give them access to company shared drives on that device. But you’ll have to

do something about that issue. See the section “How Does This Affect You as IT Manager?” on page 298.

• Don’t just cry out “Security risk!” every time someone asks about a new device or app. If you just whine about it, without addressing it, eventually they are going to ignore you and will look for

someone who can figure out how to get it done, and not someone who only talks about why it can’t

be done. If you provide an approved list, if you test several devices and apps and send out recom-

mendations, if you warn against certain solutions or approaches, you’ll be listened to.

11.1 GET IN FRONT OF THE CURVE The Blurry Line between Company-Owned and Personally-Owned Equipment (BYO Policies) In a 2011 survey by InformationWeek, 54% of technical professionals said that their IT group either officially or unofficially supports personally-owned devices. The feeling is that “You can’t beat ‘em, so

you might as well join ‘em.” While we hardly advocate such blatant submission for most IT issues,

when it comes to holding back the tidal wave of personal devices into the workplace, we suggest

you not try to resist but instead embrace, guide, and direct.

The line between what is a corporate tool and what is a personal piece of equipment has been blurred

considerably as employees increase their use of personally-owned devices for their job, and the use of

company-owned devices for personal use. It is in the best interests of both the company and the em-

ployee if that trend is recognized by the company and addressed directly. And one way to address the

issue is for IT to implement a Bring Your Own (BYO) policy.

Due to their very nature and prevalence, there are many administrative issues associated with mo-

bile devices. These include:

• Dealing with procurement (devices, accessories, service plans)

• Supporting users that have a myriad of different device types

288 CHAPTER 11 Connectivity: Social Media, Handhelds, and More

• Updates to operating systems and applications

• Activities associated with lost, stolen, and broken devices and accessories

• Monitoring service plans and costs, etc.

In addition, companies are dealing with frequent requests from employees to change their devices just

because something newer came out, to change carriers, and to transfer their number to another device

when they leave the company. In addition, many employees already have their own devices and don’t

want to carry a second one for work.

With a BYO policy, employees use their own personal device for work needs. In some cases, the

company may provide the employee with a stipend to help defray the initial purchase of the unit, and/or

some sort of reimbursement for some of the monthly charges.

The biggest technical challenge associated with BYO has been with security concerns regarding the

organization’s network, data, and e-mail. While using a personally-owned device for this access may

not increase the risk, there is a concern that the company may not have as much control over the device.

To address this, some companies have granted personally-owned devices access only if the devices

allow for some degree of organizational management, such as remote wipe, screen timeout, use of pass-

words, etc.

A BYO program can eliminate a lot of the headaches associated with the administration and man-

agement of mobile devices. With careful planning the program can adequately address the organiza-

tion’s security concerns, while giving employees a great deal of freedom in the type of device they use.

BYO programs usually save the company money, but that is because a portion, if not all, of the expense

is shifted to the employee.

The New Technologies of Connectedness IT managers—and teachers, parents, and anyone in a supervisory role of any kind—are facing a crisis

of attention. The ones being supervised (and you, of course) have a huge range of options fromwhich to

choose when looking for connections and/or distractions:

• Instant messages (IM) • Social networks (Facebook, LinkedIn)

• Text messages

• Blogs

• Video sharing (YouTube)

• Microblogs (Twitter.com, Plurk.com, Yammer.com, Chatter.com) • Podcasts • Crowdsourcing (Kluster.com, IdeaScale.com, Crowdcast.com) • Apps, gadgets, and widgets that can be installed on mobile devices • Wikis

• Mashups

• RSS feeds

This list contains just some of the different connection types, and doesn’t even cover the various devices that can be used with those connections. There will be another hot technology tomorrow.

28911.1 Get in front of the curve

We’d list it, but we don’t know what it is yet. The particular technology is not as important as how you

react to it, how you take advantage of it, and how you integrate it into your work (and your life). And all

these tools and technologies can be accessed with machines ranging from smart phones to tablets, so

that people can stay connected 24/7/365, from anywhere on the planet (even on a plane in flight) as long

as they have a wireless connection.

Another point to remember is thatmany technologies are hot for awhile and then totally disappear.The

technologies and products in this industry are very dynamic. New tools can build slowly and then burst

into mainstream use. In 2009 Twitter’s use exploded when Oprah Winfrey joined. That same year CNN

and Ashton Kutcher competed to see who would be the first with a million followers, only to see Lady

Gaga leave that number in the dust when she hit 10million followers in 2011. Today’s “new thing” can be

as dated as rotary telephones in short order. The same is true regarding the competition within each space.

Friendster practically invented social networking, but is now just a historical reference. Check out this fun

article on forgotten tech products (dot matrix printers and After Dark (remember the flying toasters?) are

on the list): www.pcadvisor.co.uk/news/index.cfm?newsid¼114088. People instant message and check their Facebook page during meetings. They use their smart

phones to find which restaurant has the best deal “right now.” They download podcasts for audio tours

when they go to a museum. They post negative reviews about neighborhood merchants as they are

walking out of the store. They text while driving. And reports are that all this behavior is only going

to get more common (extranet.neverfailgroup.com/get/?fileID¼17ff8c&reg¼0&ws¼1). You can’t know if this kind of behavior is going to get better or worse, but it is going to be more

common. Perhaps one of the great indicators of the popularity of these solutions and products on our

culture is how they become part of the language. When products and technologies become verbs

(to “google", “IM", “text", etc.), it is clear that they are having an enormous impact.

Like most of the topics discussed in this book, there are definite benefits and challenges with this

level of connectivity (see Table 11.1).

Benefits and Challenges of Connectivity

Table 11.1 Benefits and Challenges of Connectivity

Benefits Challenges

“Velocity matters,” as Eric Schmidt, executive chairman of Google, is famously quoted as saying. In many corporate situations, speed is of the essence.

Instead of measuring cycles in months and years, some trends are now beingmeasured day by day, and hour by hour.

Getting e-mail alerts when a particular price has dropped—say the airfare to Disney World for that vacation you have been talking about—is an example of a significantly shorter sales cycle. You’ll “pull the trigger” on that sale theminute the price drops below a certain point; youmight even have the purchasemade automatically based on that event.

Some processes do not improve with more speed. People-centric events, for example, are typically not made better by increasing the velocity. A new employee, for example, needs some time to get acclimated to his new surroundings (see Chapter 3, Staffing Your IT Team on page 65).

Although they should feel challenged and motivated, everybody is going to take a certain amount of time to get used to their new surroundings. Demanding that people adjust in minutes instead of days may not always improve the situation.

Continued

290 CHAPTER 11 Connectivity: Social Media, Handhelds, and More

Table 11.1 Benefits and Challenges of Connectivity—Cont’d

Benefits Challenges

Working online is the very essence of working “at the speed of thought” (as Bill Gates called his book). Most IT professionals have had the experience of thinking of an interesting and clever domain name—only to find out it was taken days ago.

It now takes—and will take in the future—an enormous amount of effort to find the proper balance to deal with the effects of all this connectivity. It has taken U.S. states a long time and a lot of energy and money to outlaw handheld cell phones and texting while driving; schools ban cell phones during classes; and employees are banned from bringing laptops to meetings.

Most business processes move better with faster information. If you order three laptops for new employees and only two machines are in stock with your vendor, you are better off finding that out when you’re placing your order instead of when the partial shipment shows up.

Most people are not as good at multitasking as they think they are.

Offerings can be customized based on where you are. Using geo-location technology you can instantly see what restaurants and coupons are nearest you.

Toomuch information can be overwhelming. If you’ve ever researched a product online, such as a digital camera, the volume of information regarding features, specifications, reviews, models, resellers, and options can be numbing.

Get data about new technologies and new ideas fast.

Who has not left a meeting, gone back to their computer, and Googled a key phrase they heard for the first time that morning? Not too long ago, that kind of information gathering took much more time and energy.

Many people are finding all these possibilities very hard to resist, and it can have negative impacts on their home and work lives. The word “addiction” is often used to describe some of these behaviors.

Find out what others are saying about a product. Online communities and reviews have feedback from others who are using the product and can report on the good and bad of it, as well as the vendor. Not only can you find out the lowest airfare, but you can also find out which seats on the plane are favored and/or hated. Many companies (e.g., Amazon, Dell) collect and share user feedback about their products with 1–5 star ratings.

Too much information can be as big a problem as too little information.

Not only are many people uninterested in what their Facebook connections or Twitter followers had for breakfast, or that they were stuck in traffic going to work, but there are more and more stories about people getting in trouble as a result of what they shared.

Unprecedented levels of association—both professional and personal are available. The person who is looking at their Facebook page in a meeting may be reading a “post on his wall” from an old high school classmate. However, she might also be reading an e-mail from a colleague at another firm telling her about some bad experiences with a technology solution you’re considering implementing, which means your implementation could avoid a major pitfall.

An innocuous posting can go viral and wreak havoc on a company’s reputation. In 2009 musician David Carroll posted a song he wrote on YouTube on his 9-month experience trying to get reimbursed by United Airlines for a broken guitar. The story went viral, received over 10 million hits on You Tube, and was covered by national media outlets. Shortly after the video was posted, United reimbursed Carroll (which he donated to charity). Had their customer service team been more forgiving initially, United could’ve avoided untold amounts of negative publicity.

Continued

29111.1 Get in front of the curve

Dealing with a Lot More Empowered Users Regardless of where they are on the food chain—be they the CEO or her less than computer-literate

marketing advisor—everyone in the organization suddenly has a lot more computing power at

their fingertips. That is, like many things in this book (and in life), both the good news and the bad news.

Smart phones have the power of computers built just a few years ago, handhelds have the power and

mobility only dreamed of by laptop designers just a few product design cycles in the past.

Employees now want the freedom to access data, install applications, and to do whatever they feel

will help them get their job done better and faster. Instead of looking at reports, employees may ask for

the raw data so that they can analyze it themselves, and possibly (if not likely) find trends or present

them in a manner that no one has seen before. More and more they want the tools so that they can do it

Table 11.1 Benefits and Challenges of Connectivity—Cont’d

Benefits Challenges

Effective methods of staying in touch, particularly across geographic and time boundaries, are now common. (The Web has expedited a 24-hour “follow-the-sun” work cycle, for example: software code written in the United States is modified or enhanced overseas while U.S. programmers are sleeping. Then the process starts again the next day.)

IM-ing about innocent activities such as the planned department lunch is often the lead-in for extended, sidetracking “conversations.”

Whether it is at the water cooler or the computer, a little chit chat is harmless and often helps people enjoy their workday more, but too much can be too much.

A valuable way to develop andmaintain contacts, find people with similar interests, and “stay in touch.” (Social networking sites for professionals such as LinkedIn have become the Rotary Club breakfasts of the 21st century.)

The concept of downtime is rapidly disappearing. Leaving the laptop at home when leaving for vacation is no longer a method for “getting away,” because the smart phone (with email) gets to go on the trip.

Easy to tap the knowledge base of your network by simply posting a question to the online community. (Google searches often return answers to tough questions that are posted on user forums.)

People spend more time building their network or Facebook page rather than actually maintaining their relationships. This action could impact interpersonal skills and leave people wondering about all your free time.

Multitasking at work is now common, and productivity (in some areas) has increased radically. You can check your e-mail while at lunch and download the latest sales figures while waiting for the elevator.

With all the noise, getting workers to focus on the tasks at hand is much harder. It requires skill to learn what is a critical phone call and what is a trivial IM or vice versa.

Enhanced career growth opportunities by beingmore connected, more informed, and more visible. Obscure positions in unheard of companies are now available for the dedicated job searcher.

With networking sites, you may be judged by the company you keep. Being “friended” on Facebook does not mean the same thing as being “connected” on LinkedIn. The two, though, are trying to crowd into each other’s territory.

GoToMeeting, Webex, and videoconferencing tools have transformed the meeting experience radically. Attendees from around the globe can participate in large conferences or staff meetings at the click of a mouse and for minimal or no expense.

Risks of having your non-work activities being seen and judged by your boss and co-workers. Do you want your alcohol-induced karaoke contest entry on YouTube or family vacation pictures on Facebook seen by your work colleagues?

292 CHAPTER 11 Connectivity: Social Media, Handhelds, and More

themselves. And, they may not even want to use the tools you provide, because they read a review

about, or a colleague mentioned, a tool that is “far better.” But they then come back to you to figure

out how to make that tool operate within your environment.

Wisdom of Crowds An important point that should not be lost in this discussion is the “wisdom of crowds.” James

Surowiecki’s bestselling book The Wisdom of Crowds is subtitled: “Why the Many Are Smarter Than the Few and How Collective Wisdom Shapes Business, Economies, Societies, and Nations.” The con-

cept is simple and counterintuitive: “groups are remarkably intelligent, and are often smarter than the

smartest people in them.” In fact, this concept, along with the capabilities of new technologies, has led

to the coining of the term “crowdsourcing,” which refers to taking advantage of the online community

to solve problems. Trying to figure out the best way to integrate two applications? Instead of doing days

or weeks of research, you may be able to get the best answer much faster by simply “asking the world.”

Want to find out if a product or technology really works as advertised? Before investing the time to set

up your own trial, see what others think.

The rise of all these technologies is no less than the “trickling down” of that insight: groups are often

(although not always) smarter than one person. This is one reason for the popularity of product reviews

in online communities.

According to Facebook, over one billion pieces of content (Web links, news stories, blog posts,

notes, photos, etc.) are shared on their site each week (www.facebook.com/press/info.php?statistics). As of December, 2011, Facebook had 800 million users with 75 of those outside the United States—

these are not numbers that can be ignored.

11.2 THE POWER OF ALL THESE CONNECTIONS There is a tremendous range of “real-world” (as opposed to IT-world only) applications for the new

range of hyper-connected software and hardware. In this section we discuss:

• How companies use the Web

• How companies use intranets

• How companies use social media and mobile devices

How Companies Use the Web The ways that theWeb can benefit your company are probably only limited by your imagination. Some

of the more successful efforts include the following.

• Keep your “doors open” 24 hours a day:Airline sites began using theWeb for this reason, but now it is common for almost any enterprise to consider the 24/7/365 exposure of the Web to be critical to

their success. Retail stores around the planet sell their goods to users online elsewhere on the Web. It

seems obvious now, but even 20 years ago, that was unheard of. (Amazon was founded in 1995.) • Adjust to changing market conditions almost instantaneously with price adjustments, sales

incentives, product placement, and so on. Dell, for example, changes its product promotions every few days. Retailers use their websites to encourage retail store purchases, while their retail

stores encourage visits to, and purchases from, the web site. Many retailers are adopting this model;

29311.2 The power of all these connections

retail stores can increase the inventory they can claim to “have available” and online stores can

promise quick delivery of products. In both cases, the brand name is strongly reinforced.

• Provide product information (description, specifications, uses) or company data (financial, executive biographies, job postings, press releases) directly into the hands of consumers.

• Improve customer service. Almost all companies provide e-mail options for feedback and ques- tions. Most common (usually via a “Contact Us” link) is the ability to send e-mail feedback. In

addition, many companies now are also employing an online chat option for customer service.

You can IM, chat, e-mail—many companies offer several different contact options. Companies

can receive more precise and immediate market research by tracking customer activity on the

Web, as well as web-based surveys and direct marketing via e-mail. Customer service on the

Web also includes posting product manuals and other documentation, having an FAQ section

for common issues and questions, etc. Large companies are nowmonitoring what’s being said about

them on various social media, and taking action to address issues, respond to customer complaints,

and change their image in the marketplace.

How Companies Use Intranets Companies use intranet sites for many of the same reasons that they use an Internet site: for conve-

nience, ease of use, speed, reduced errors, enhanced offerings, and to reduce costs. Common intranet

uses include:

Function Description

Posting of the company’s policy manual

Putting the policy manual on the intranet eliminates the hassle of distributing periodic updates to the old three-ring binder. Plus, it ensures that everyone has immediate access to the latest version and dramatically reduces the inquiries to HR and other departments about policies.

Payroll information Employees can use the intranet to view and update their tax information (e.g., W-4 forms) and view their pay stubs. These two functions alone can eliminate a great deal of paper and phone calls.

Time sheets A convenient replacement for paper forms to track hours, sick days, vacation days, etc. An automatic feed to the payroll system can reduce a lot of paper movement and keying errors.

Benefit plan enrollment In addition to viewing information about the differences in plans, employees can sign up, identify beneficiaries, and authorize payroll deductions.

Marketing material Company branding information, common graphics, data sheets, sales presentations, and so on are kept on an intranet, making it easy to update and to give to people located around the country and around the globe.

Employee discounts An intranet can provide information on getting employee discounts on the company’s own products, as well as discount programs that may be available to employees from suppliers, customers, and partners.

T&E submissions Employees can submit travel and expense information with a browser. Not only is the submission done online (including receipts, by scanning them to electronic files), but managers can approve the requests online, and accounting can review/audit them online and authorize reimbursement (which is often a direct deposit to the employee’s bank account). Transactions from the company credit card can be posted automatically and reimbursed by electronic transfer to the card issuer.

Continued

294 CHAPTER 11 Connectivity: Social Media, Handhelds, and More

Function Description

Job postings Many companies will post job openings on their intranet before they post them on the public Web site or job boards. By filling jobs with internal candidates (or referrals from employees), the company can save money on recruiting and advertising fees, and employees feel better about the potential for promotion and career growth.

Requesting supplies Virtual catalogs from the supply room or approved vendors can be posted, and employees can submit their requests, which are delivered to their desks the next day.

Company announcements The intranet (sometimes coupled with e-mail) can be used to make employees aware of everything from the year’s holiday schedule to the plans for the company picnic, and from new hires and promotions to the cafeteria menu.

Department budgeting Department managers can see their department’s spending history and plan next year’s budget. All budgets are then rolled up automatically to create a company-wide budget. It sure beats e-mailing spreadsheets around.

Request IT services and equipment

Tasks like requesting new equipment, conference room setups, submitting and tracking a problem, etc. can be done online. User guides and FAQs can also be posted. Tickets to the Help Desk can be submitted, and their current status can be viewed.

In-house catering Ordering bagels for the morning meeting, lunch for the visiting speakers, everything but beer for the Friday bash—intranets often provide that quick-and-dirty method of getting the food brought in.

Conference room reservations

Avoid the hassles of having to call different people to see if a conference room is available when you need it; all usage and reservations are made online and available for all to see.

Training information Both materials and the corporate training calendar can be posted, along with the ability to register for upcoming class. If you missed a class, you can view an archived recording of it online. You can also use it to post links to other training and information materials (such as vendor websites).

The possibilities for using an intranet are almost unlimited. Look at almost any manual and/or paper-

based process and there’s a good chance it would be more productive, more accurate, faster, and more

efficient if it moved online. And, with many of these functions already online, companies are beginning

to explore making them available with apps on handheld devices.

How Companies Use Social Media and Mobile Devices Ways That Help the Company • Staying in touch with professional colleagues • Monitoring what’s being said about company products and services, monitoring the competition • Entering time sheets

• Tracking orders and shipments, and being notified instantly when a delivery is made

• Responding to customers’ feedback

• Solving problems

29511.2 The power of all these connections

• Seeking feedback and comment

• Accessing information from the field workforce (sales reps, police officers, health inspectors,

delivery truck drivers, service technicians, etc.)

• Alerting customers to new products, features, services, and uses • Identifying the core-base of customers and targeting campaigns to them • Seeing how comparable companies are addressing issues and problems • Evaluating feedback and suggestions from customer and suppliers

• Analyzing data

• Creating and showing presentations

• Entering customer info, and possibly orders, while meeting with customers

• Providing customer/supplier education

• Tracking expenses while traveling

Ways That Don’t Really Help the Company • Checking personal e-mail • Staying in touch with friends and relatives

• Checking Facebook pages

• Doing job searches

• Online banking

• Checking sport scores

However, it is important to note that while these activities don’t help the organization, they probably

improve the employee’s “work/life balance.” The thinking is that it’s better to allow some flexibility in

what the employee does on company time, with company resources, as opposed to having the employee

distracted that these issues need attention, and having to take time away from the company to deal with

them. It is also a way for an employer to recognize that employees have a personal life. And, if em-

ployers are expecting employees to be available outside of work hours, it’s only fair that employees get

to use some work-time for personal matters.

Mobile Device Operating Systems, Apps, and Hardware To say this market is “fluid” is like saying there have been “a few” patches toWindows. Things change

in IT. (On the other hand, if we were scared of change, we never would have even bothered with a new

edition of this book—and you would be working in some other industry right now.)

As this book was written, there are four main players in the smart phone operating system market:

• iOS (Apple) • Windows Phone (Microsoft) • Android (Google)

• BlackBerry (RIM)

Other names in this space have included Palm OS, Symbian, and WebOS. While you might prefer

to choose only one for your company (and while that might happen, it is highly unlikely it will be

the only one used at your company), OSes for handhelds often walk in your front door without

your permission. See the section “Consumerization of IT” in Chapter 10, Working with Users on page 271.

Most likely, your corporate handheld OSes environment will consist of three:

296 CHAPTER 11 Connectivity: Social Media, Handhelds, and More

• Android

• iOS

• BlackBerry

Note that we did not say the “largest number of handheld OSs around your officewill be . . . ” BlackBerry is often the preferred corporate choice, but Apple and Android are far more popular choices for operating systems on personal devices. The handheld market was virtually launched with RIM’s Blackberry so- lution. And it is still considered the best at integration with corporate e-mail environments. But it has

lost a lot of ground to the competitors and the limited supply of third-party apps. Android has gained

tremendous popularity because it is available on a large number of different devices, frommany carriers,

and offers a healthy supply of third-party apps. There are concerns that Android is not a mature solution,

and isn’t as stable and secure as others—yet. Apple’s iOS has a strong following due to the design of the

devices and user interface, as well as the largest offering of third-party apps. However, this OS runs only

on a limited number of Apple-manufactured devices, which are expensive compared to its competitors.

“Apps” (applications for the handhelds) are different from traditional applications running in your

IT department for a couple of reasons:

• They are either free or often priced under $10.

• They are generally downloaded by the users themselves, not you or a member of your team. This is

both good and bad news, of course; you don’t have to worry about installing it, but you (probably)

are still going to have to support it.

Handheld Hardware Anything from a smart phone to a netbook and a tablet counts these days as a “handheld.” But aside

from being very portable, their claim to fame is that they can performmultiple functions and connect to

the Internet. Handheld devices are available from vendors like Apple, Blackberry, Nokia, Samsung,

Motorola, LG, and HTC to name a few. Newmodels are released every few months with different form

factors, capabilities, and features. In the United States, devices from one carrier will not work with

another carrier. And while you may be able to find a user manual online somewhere (there definitely

won’t be one in the box), it seems that most users just feel that they can figure it on their own.

Of course, any handheld device that includes phone functionality requires carrier service to operate.

However, netbooks and tablets may only be equipped with Wi-Fi capabilities and can connect to a

mobile service as an option, or with an air-card. Every device has a large number of accessories avail-

able from ear-phones to cases of every color, design, and material.

Use of Mobile Devices Because mobile devices are mobile, and may be entirely out of the control and visibility of the orga-

nization, it’s a good idea to set some guidelines about their use:

• Report stolen or lost devices immediately • Refrain from downloading for-fee services—ring tones or applications, music, video streaming, etc. • Refrain from downloading large data files such as video • Stay within the allotted minutes and feature sets of the service plan

• Notify IT ahead of any departure for international travel so that international roaming capabilities

are enabled for the applicable travel dates and countries

• Limit use of directory assistance (411)

29711.2 The power of all these connections

• Adhere to the same security guidelines and principles for general computer use (e.g., don’t open

files or links from unknown sources)

• Use a password

• Don’t leave the device unattended

Many of these policies are related to managing costs for company-owned devices, but in many cases

employees are using their own devices under a BYO policy, which was discussed earlier in this chapter

in the section “The Blurry Line between Company-Owned and Personally-Owned Equipment (BYOPolicies)” on page 288.Mobile device management (MDM) tools can also help with the security of mobile devices. Products from companies like Mobile Iron and Good Technology are popular in

the MDM space and provide capabilities like device and app inventory, feature lockdown, device

configuration, remote lock and wipe, encryption, and extensive logging.

11.3 HOW DOES THIS AFFECT YOU AS IT MANAGER?

Success with Web 2.0 is coming at a cost. IT managers have to balance all the collaboration and innovation emanating from these tools against new security risks, as well as data access and management challenges. And they have to do it in many cases with products that lack security and data management features. This means that IT departments must find ways to get control over the use of these tools in the workplace. www.internetevolution.com/document.asp?doc_id¼172026

The particular challenge with all these new social media and connectivity technologies (as with almost

any new solution) is that it is a double-edged sword. While they can be strategic tools for business and

improve employee productivity, they can also be factors contributing to employee distractions and per-

formance problems.

Many companies are still trying to figure out how to best use these technologies, and the answers

won’t come from the IT department alone. As is always the case, many parts of the organization (such

as Legal and HR) need to be involved.

Lead, Encourage, and Experiment It may be appropriate to just let various groups experiment with these tools to see how well they work

and what results they yield. Since the use of many of these tools is essentially viral, exercising toomuch

control or trying too hard to influence its use and direction may simply lead to failure. Some companies

have loved the idea of social networking, but instead of just making use of the tools that are already

available, they have tried to build their own internal social networking sites. In many cases, their efforts

have not been successful simply because the audience is too small to generate the necessary viral

growth, companies are unable to build/buy something as functional as what already exists, or em-

ployees really don’t have too much interest in maintaining their listing on a “company” site.

A compromise solution may be to make use of social media tools that are virtually private. For

example, Yammer.com is very similar to Twitter.com, but is set up so that information is only shared

among people of the same organization. Similarly, Google, which owns YouTube, has a video-sharing

function for organizations through its Google Video for Business offering. This offering is completely

hosted by Google, is similar to YouTube, but allows you to maintain strict control and ensures

that videos are not available to the public at large. In the arena of crowdsourcing and collaboration,

298 CHAPTER 11 Connectivity: Social Media, Handhelds, and More

solutions such as Kluster.com allow you to harness the intelligence of your internal team (or any

individuals that you designate).

For your organization’s use, recruit people who are passionate about certain things and encourage

their use of new solutions. If someone is passionate about all the different ways that your company’s

products can be used, encourage them to start a company-sponsored blog or Facebook page. If someone

is very focused on what your company is doing to be green and save the environment, let them share

those activities via Twitter.com. Work with the public relations team to create groups and networks on

social networking sites to share announcements. Consider integrating some of these technologies into

your corporate web site. Some ideas will flourish, whereas others may flounder; that’s okay, it’s an

iterative process and there’s minimal cost in seeing what happens. With social media and connectivity

tools, speed and convenience are often the priorities over the quality of the specific tool, which may be

antithetical to how IT and your company have traditionally operated—see the next section “It’s Not the Tools, But How They Are Used” on page 299.

Social media and collaboration tools, whether used internally for employees, or externally for cus-

tomer and partners, should not be considered an IT initiative. Like any other application or tool, they

should be implemented for the benefit of the business, or the request of the business. Of course, IT should

be involved in the selection and implementation of the tools, helping to monitor its usage, etc. But, this

involvement needs to be with other business and department heads who are taking the lead on choosing to

go down these paths. Working with these teams, you can help to move forward by discussing:

• What are we trying to accomplish?

• Who are the teams/employees that we think will be the most open to this, and get the most value

from it?

• How do we evaluate progress and success? • How do people communicate today? And with whom? • What are the most effective communication paths and mechanisms currently in place and can those

be leveraged to enhance further collaboration?

• How much control do we exert and how much monitoring do we do?

• Is it possible to effectively measure collaboration, teamwork, productivity, and effectiveness of

communications? If so, have they been measured already, and howmuch improvement is necessary

to say a change was justified and successful?

It’s Not the Tools, But How They Are Used Many organizations spend a great deal of time focusing on which tools to implement for their social

networking and social media initiatives. However, as a general rule in life (and IT), it’s not the tools, but

how they are implemented and used.

• Make sure that whatever you do with social media that it fits your company’s organization, values,

and culture. • Ideally the use of social media tools should not be separated from regular work-flow and processes;

the more integrated the better.

• By definition, social media and collaboration tools are for two-way communications. If your orga-

nization only sees it for ‘talking’ (to employees and/or customers) and not for ‘listening,’ you’re

limiting the chances for success.

29911.3 How does this affect you as IT manager?

• Don’t try to impose too much control on its use. Let the users play and experiment, find its best uses,

and then encourage that sort of organic growth.

• Don’t expect instant enterprise-wide adoption and success. Consider starting small, perhaps with

one department, or one work-group that seems particularly well suited to collaborative and social

media tools, perhaps because of the work they do, or how they work together already. Initially start

with those who are more inclined to work collaboratively, without having to impose it on them.

You’re unlikely to ever get 100% participation, but that’s fine.

• Different employees will use the tools in different way, and to different degrees. That’s expected

and normal. You may find the greatest differences among the various generations of employees.

This topic is discussed more in the section “Generational Issues at Work” in Chapter 2, Managing Your IT Team on page 57.

• Don’t be afraid of failure. If something isn’t working, figure out why, and try something else. Sim-

ilarly, if the tools are being used differently than originally expected, resist the urge to change those

behaviors without first looking at the value and benefit in how employees are choosing to use it. • Recognize failure. If you find that you have to develop marketing campaigns, remind employees to

use the tools, or are forcing everyone to create their profiles, it’s highly likely that your current plan

isn’t working.

• Be flexible, and reduce some of the traditional rigors associated with work in a large organization.

Let employees choose their own profile photos, as opposed to having to use the formal (usually out

of date) one on their company ID. Allow ground-rules and guidelines for use to evolve from the

community itself, as opposed to having them defined by others. (See the next section on page 300 for a discussion of some guidelines that shouldn’t be ignored.)

• Consider implementing tools that monitor social media websites so that your company can actively

knowwhat’s being said about your organization. There are many free tools you can use (like Google

Alerts, Web search tools, and Social Mention) as well as a number of paid tools that are ideal for the

enterprise like Attensity and Radian6.

As you can see, working on a social media or collaboration tool project is very different from traditional

IT systems projects. These projects will require greater flexibility and adaptability, and less focus on

rigorous project management techniques. The project may prove to have a learning curve for you as

well as the users and the organization.

Set Guidelines It may be effective and worthwhile to set some guidelines for the use of social media technologies, just

as you have policies for the use of e-mail. For example:

• No posting of confidential or sensitive company information. • Employees are responsible for the information they publish. • Using their company e-mail addresses when posting information about themselves and their life

outside of the office is not allowed.

• Reminding everyone that postings on the Web are available “for the world” to see and very often

can’t be removed.

• Reminding people of the importance of respecting intellectual property (the reason behind many

lawsuits).

You don’t want to define use so tightly that people feel constrained, just help them understand the

boundaries. With all new tools and capabilities, some guidance and direction will help people get

300 CHAPTER 11 Connectivity: Social Media, Handhelds, and More

off to the right start and will help ensure that they don’t make any severe mistakes. The media is full

of stories of employees who have been disciplined or terminated because of what they posted on

the Web.

Think of the Possibilities! All the growth, enthusiasm, and excitement associated with these new tools and capabilities present

wonderful opportunities for today’s IT manager. They represent a whole new way of how people

and companies will live and work. You have the opportunity to influence and guide your company’s

use of them. The last thing you want to do is be a naysayer and dismiss them, especially when your

bosses are reading how other companies are using them. Be careful not to discourage use, or to exert

too much control. Tech-savvy workers will find ways around whichever policies you implement. Also,

your efforts at controlling too much may come back to haunt you via employee morale.

Some of this new behavior may be a break with how your company normally operates, but remem-

ber that connectivity has radically changed the way people live and work. If companies can’t show the

same sort of adaptability (not only to the technologies, but to their own personnel) they will be left

behind by their competition.

Remember Your Goals In Chapter 1, The Role of an IT Manager, there is a section called “Develop an IT Strategy” on page 10. That section discusses topics such as “What are your assets?” and “How do you plan to satisfy your customers’ needs?” Overall, your goals are to leverage information technologies for the benefit of

your organization. You and your department are enablers. It may be simpler and easier to just deny

access to things, but it is important to remember that IT is not there to make things simpler and easier

for itself—it’s supposed to be doing that for the business and the users.

In the past, IT departments were slow to react to new trends, which pretty much left users to “forget

about IT” and move ahead on their own. This happened in the 1980s when personal PCs first appeared

and traditional mainframe-based IT dismissed them as toys. Similarly, IT was late to accept the Inter-

net. In both cases, IT eventually woke up and embraced these technologies. But there is an important

lesson here: Don’t ignore your users, they might just be telling you about the next new thing.

What Is “Focused” and What Is “Distracted”? First, a word on what these offerings are not: excuses for you to become the Attention Police. While there are all kinds of reasons why an employee should or should not be Twittering at work, your work-

place may or may not be an organization that cares. If there are employees who seem to be spending far

too much time online on activities unrelated to work, it is important to remember that this is primarily

an HR issue, not an IT issue (although IT may be involved). These situations are similar to those where

an employee is spending too much time on personal phone calls. Most workplaces today care about

results, not style. There are CEOs that Twitter (twitter.com/zappos); Mark Cuban Twitters (and if

billionaires Twitter, who are we to say it is not corporate?). As a Forbes.com article says, “[this] is

no longer just for teenagers” (www.forbes.com/2009/03/11/social-networking-executives-leader ship -managing-facebook.html).

30111.3 How does this affect you as IT manager?

These technologies are being embraced because they generally allow people to be more

productive—do more, do it quicker, do it from anywhere, and do more than one thing at a time. They

help the work–life balance by allowing working parents to stay in touch with their children and to know

that they can be reached immediately if there is a problem. They enable employees to work at nontra-

ditional hours and at nontraditional locations as they choose to, or need to.

However, these same technologies can distract people from the work they are supposed to be doing

or using these technologies in less than honest ways (such as the employee who arranges for an e-mail

to be sent to his boss at 1 AM so that it looks like the employee is working tirelessly).

Also, while your workers are using these tools for their work–life balance, corporations are embrac-

ing these tools for the benefit of their customers and clients. Companies are creating pages and groups on

all the networking sites (such as Facebook.com and LinkedIn.com), as well as sending out news via

Twitter.com. All of this helps with marketing and branding, keeps customers informed, creates a sense

of community, and helps develop and maintain strong relationships. It is certainly a sign of the reach,

power, and maturity of these technologies. Politicians have embraced them not only for campaigns, but

also asworthwhile toolswhile serving in office. Even theWhiteHouse has its own channel onYouTube.

USERS CHECK MOBILE E-MAIL FREQUENTLY

Our research found that 47% of mobile device users check their mobile e-mail more than 10 times per day while at work, while 10% check mobile e-mail more than 40 times each day when at work. After hours during the evening, 37% of mobile users check their mobile e-mail more than 10 times each day. Even on the weekend, 47% of mobile users check their mobile e-mail more than 10 times per day. The Osterman Research, Inc. Black Diamond, Washington extranet.neverfailgroup.com/download/OR%20Executive%20Summary%20-%20Mobile%20Messaging% 20Market%20Trends%202008-2011%20v2.pdf

And, remember this is not an IT-only issue. All the tools for social networking and mobility are just

that—tools. IT shouldn’t be the determining factor in what tools are used, how they are used, and what

they are used for.

11.4 Further References Websites extranet.neverfailgroup.com/get/?fileID¼17ff8c&reg¼0&ws¼1 (mobile messaging market trends). www.attensity.com (social media monitoring tool). www.ecommercetimes.com (e-commerce news). www.facebook.com/press/info.php?statistics. www.forbes.com/2009/03/11/social-networking-executives-leadership-managing-facebook.html (social net-

working at the executive levels).

www.good.com (mobile device management tool vendor). www.google.com/apps/intl/en/business/video.html. www.kluster.com (crowd-sourcing tool). www.mobileiron.com (mobile device management tool vendor). www.pcadvisor.co.uk/news/index.cfm?newsid¼114088 (gone, but not forgotten technologies). www.radian6.com (social media monitoring tool).

302 CHAPTER 11 Connectivity: Social Media, Handhelds, and More

www.socialmention.com (social media monitoring tool). www.yammer.com (micro-blogging tool for internal use).

Books and Articles Bell, A., 2009. Exploring Web 2.0: Second Generation Interactive Tools—Blogs, Podcasts, Wikis, Networking,

Virtual Words, and More. CreateSpace.

Blanchard, O., 2011. Social Media ROI: Managing andMeasuring Social Media, Efforts in Your Organization. Que.

Carne, E.B., 2011. Connections for the Digital Age: Multimedia Communications for Mobile Nomadic and Fixed

Devices. Wiley.

Custy, J., 2011. Unplanned Obsolescenc. Information Week August 15.

Faeth, F., Busateri, J., 2009. Web 2.0 Building Blocks. Baseline Magazine March.

Finneran, M., 2011. A New Approach for Mobile. Information Week August 15.

Fried, S., 2010. Mobile Device Security: A Comprehensive Guide to Securing Your Information in a Moving

World. Auerbach Publications.

Healey, M., 2011. The OS Mess. Information Week July 11.

Janer, M., 2009. The Web 2.0 Balancing Act. Information Week February 16.

Johnson, M., 2011. Mobile Device Management: What you Need to Know For IT Operations Management.

Emereo Pty Ltd.

Kang, S., 2011. Business Intelligence Moves to Mobile Devices. Baseline Magazine July/August.

Kerpen, D., 2011. Likeable Social Media: How to Delight Your Customers, Create an Irresistible Brand, and Be

Generally Amazing on Facebook (& Other Social Networks). McGraw-Hill.

Klososky, S., 2011. Enterprise Social Technology: Helping Organizations Harness the Power of Social Media,

Social Networking Social Relevance. Greenleaf Book Group Press.

Li, C., Bernoff, J., 2009. Groundswell: Winning in a World Transformed by Social Technologies. Harvard Busi-

ness School.

Sankar, K., Bouchard, S.A., 2009. Enterprise Web 2.0 Fundamentals. Cisco Press.

Shah, R., 2011. Social Networking for Business: Choosing the Right Tools and Resources to Fit Your Needs.

Pearson Prentice Hall.

Silver, D., 2009. The Social Network Business Plan: 18 Strategies That Will Create Great Wealth. Wiley.

Stackpole, B., 2011. Managing the Tablet Wave. Computerworld June 6.

Stackpole, B., 2011. The Mobile App Gold Rush. Computerworld August 22.

Surowiecki, J., 2005. The Wisdom of Crowds. Anchor.

30311.4 Further references

Glossary

0-9 360 Reviews: a performance review in which employees receive feedback from not only their direct supervisor,

but from other individuals as well, including peers and subordinates.

A ACD (Automatic Call Distribution): a telephony solution that can route calls to technicians based on menu

prompts and can provide detailed reports about activity.

Adware: software that installs itself on a workstation for the purpose of displaying ads to the user. Adware is generally unwanted and often installed without the knowledge of the user. It is considered to be malware.

AES: a data encryption standard. Agile Development: a method of software development that stresses quick development cycles; it is seen as an

alternative to the “waterfall” method.

Agile Meetings: daily meetings, often called “stand-ups” or “scrums.” The idea is to radically increase commu- nication but in much briefer formats; they are called “stand-ups” because people tend to ramble less when they

have to stand up the entire meeting.

Annual Licensing: a software licensing model that requires the license to be renewed periodically, typically on an annual basis.

Asset management: processes and techniques employed to minimize TCO (total cost of ownership). Automatic Call Distribution (ACD): a telephony solution that can route calls to technicians based on menu

prompts and can provide detailed reports about activity.

B B2B: Business-to-Business e-commerce marketing direction. B2C: Business-to-Customer e-commerce marketing direction. Backdoor Trojans: Trojan horse programs that allow a hacker to control your computer remotely. Basel II: international agreement that sets out the details for adopting more risk-sensitive minimum capital

requirements for banking organizations.

BCP (Business Continuity Planning): a methodology used to create a plan for how an organization will resume partially or completely interrupted critical function(s) within a predetermined time after a disaster or disrup-

tion. BCP differentiates from disaster recovery in that DR is associated primarily with resources and facilities,

while BCP is associated primarily with processes.

Benevolent dictator: an individual with final say, who is not elected to their position, yet acts in a manner that benefits the group as a whole.

Black List: a list of e-mail originators (e-mail and IP addresses) whosemessages should always be considered spam. Black-hat hackers: hackers interested in discovering security flaws in order to take advantage and abuse them—

usually for profit, but oftentimes just to see what trouble they can cause.

Bring Your Own (BYO) Policy: policy associated with mobile devices that allows employees to use their own devices for work.

Business Applications: software packages that allow the users and the business to do their job(s). Examples include the inventory system, the payroll application, or a simple application that allows administrative assis-

tants to print mailing labels.

Business Continuity Planning (BCP): a methodology used to create a plan for how an organization will resume partially or completely interrupted critical function(s) within a predetermined time after a disaster or

IT Manager’s Handbook.

© 2012 William Holtsnider & Brian D. Jaffe. Published by Elsevier, Inc. All rights reserved. 305

disruption. BCP differentiates from disaster recovery in that DR is primarily associated with resources and

facilities, while BCP is associated primarily with processes.

BYO (Bring Your Own) Policy: policy associated with mobile devices that allows employees to use their own devices for work.

C Call tracking: a software application designed specifically for managing large volumes of calls at call centers and

help desks.

Capital expenditure: an expense category for an item that will have a useful life of several years, such as a piece of hardware.

Capital lease: an equipment lease where ownership of the equipment passes to the lessee at the end of the term. CBT: Computer-Based Training; software-based (stand-alone or on the Web) education that trains the user in a

particular product set.

CERT: research and development center at Carnegie Mellon University (funded U.S. Department of Defense and the Department of Homeland Security) that coordinates communication among security information experts.

Change Request (CR): change management notification for a change in current process/environment. Chargeback: the process for charging individual departments for various IT resources (hardware, software, staff-

ing, etc.).

Chief Security Officer (CSO): individual at a corporation in charge of defining and implementing security policies.

CIA: Confidentiality, Integrity, and Availability tenets of information security. CISSP: Certified Information Systems Security Professional security certification. CLERP-9: Australian legislation similar to U.S. version Sarbanes–Oxley. Client/server: an application architecture that has two pieces of software associated with it—one that runs on the

server and does the vast majority of the processing, and another piece that the user (or client) accesses that

serves as the user interface.

Closeout Report: the report written at the end of a project summarizing the project’s accomplishments, identi- fying areas that went well, discussion of problem areas, etc.

Cloud computing: using Internet-based resources (e.g., applications, servers, etc.) as opposed to buying and installing in-house.

CMMI: Capability Maturity Model Integration; a methodology for process improvement. CNE: Novell certification for a Certified Netware Engineer. COBIT: Control Objectives for Information and Related Technology; a set of documents developed by the

Information Systems Audit and Control Association and the IT Governance Institute that provide guidance

for computer security. Much of COBIT is available at no cost.

Collaboration: The style of management where all levels of the corporate organization are actively involved in the execution of business.

Command and Control: the style of management where there is a clear vertical chain of command: you direct your employees and your boss directs you.

Computer-Based Training (CBT): software-based (stand-alone or on theWeb) education that trains the user in a particular product set.

Concurrent User Licensing: a software licensing model based on the number of users that will be accessing an application at the same time.

COSO (Committee of Sponsoring Organizations): a private sector organization dedicated to improving the quality of financial reporting through business ethics, effective internal controls, and corporate governance.

CR (Change Request): change management notification for change in current process/environment.

306 Glossary

Critical path: the series of tasks or events that determine the project’s total duration. Any delay in any of these tasks will cause the project’s total duration to be delayed.

Crowdsourcing: the act of outsourcing a task to an undefined, generally large group of people or community, typically in the form of some sort of post on the Internet.

CSO (Chief Security Officer): individual at a corporation in charge of defining and implementing security policies.

D DARPA (Defense Advanced Research Projects Agency): federal agency originally responsible for the “net-

work of networks” that became the Internet.

Data Protection Directive (European Union): a component of the EU’s human rights and privacy laws, and for the protection of individuals’ personal data.

Database Management System (DBMS): sophisticated software system that controls the databases. DBMS (Database Management System): sophisticated software system that controls the databases. Defense Advanced Research Projects Agency (DARPA): the federal agency originally responsible for the

“network of networks” that became the Internet.

Depreciation: the decrease in the value of an item over time. DES: a data encryption standard. Development tools: all elements of software used to create other software, such as compilers, linkers, debuggers,

source code control systems, and languages.

Directory Services: a system application and database for tracking and administering resources (users, devices, etc.), that is used by all other applications. Frequently used for IDs and passwords in single sign on applications.

Disaster Recovery (DR): the ability of an infrastructure to resume operations after a disaster. Disaster Recovery differentiates from Business Continuity Planning in that Disaster Recovery is primarily associated with

resources and facilities, while BCP is primarily associated with processes.

Disk Cloning: a tool to quickly copy large amounts of data in a fraction of the time it would take to use conven- tional methods.

Distributions: a package of Open Source Software that can include the code, utilities, documentation, and support. Distributions are usually packaged and sold for a fee by third parties.

Distros: a package of Open Source Software that can include the code, utilities, documentation, and support. Distros (distributions) are usually packaged and sold for a fee by third parties.

DMADV (Define, Measure, Analyze, Design, Verify): A Six Sigma methodology for the creation of new processes.

DMAIC (Define, Measure, Analyze , Improve, Control): A Six Sigmamethodology for the refinement of exist- ing processes.

DMZ (Demilitarized Zone): an area of a network that is used to host devices that are accessible via the Internet, but are still protected by the firewall.

Dodd–Frank Act: a bill that was passed in direct response to the massive financial collapse of 2008–2009; regulates the U.S. financial system with the goal of preventing another meltdown.

DR (Disaster Recovery): the ability of an infrastructure to resume operations after a disaster. Disaster Recovery differentiates from Business Continuity Planning in that Disaster Recovery is primarily associated with

resources and facilities, while BCP is primarily associated with processes.

E E-commerce: a term to describe the many activities involved in buying and selling over the Internet. Electronic discovery: the legal discovery process (prior to a legal proceeding) associated with electronic data

such as e-mail, spreadsheets, word processing, database files, and so on.

307Glossary

Enterprise applications: an application that is widely used throughout the organization and integrates the oper- ations of many different departments and functions.

Enterprise Resource Planning (ERP): set of applications and systems that a company uses to manage its resources across the entire enterprise.

ERP: Enterprise Resource Planning; set of applications and systems that a company uses to manage its resources across the entire enterprise.

Expense item: a financial expenditure for something whose value is gone in a short period of time, typically less than a year. Also used for items that have a longer life, but are relatively inexpensive (below a threshold set by

Accounting).

F FACTA (Fair and Accurate Credit Transactions Act): a consumer rights bill that became fully effective June

1, 2005, and is an extension of the Fair Credit Reporting Act (FCRA). The rule says that in regard to consumer

information (such as name, social security number, address, etc.) you must “take reasonable measures to pro-

tect against unauthorized access or use of the information.”

FASB (Financial Accounting Standards Board): organization for establishing standards of financial accounting and reporting.

FCRA (Fair Credit Reporting Act): a consumer rights bill extended by FACTA. Firewall: a device that is used to control access between two networks. Typically used when connecting a private

network to the Internet as a way of protecting and securing the internal network from threats, hackers, and

others. Also used when connecting two private networks (e.g., supplies, partners, etc.).

Fiscal year: twelve-month period used for budgeting. Frequently, the fiscal year that a budget tracks isn’t the January–December calendar year. The year that the budget tracks can be any 12-month period, although it

generally begins on January 1, April 1, July 1, or October 1.

Fixed asset: an asset, other than cash, that is used in the normal course of business. Examples include computers, machinery, buildings, and fixtures.

FTP (File Transfer Protocol): an application protocol that transfers files from the source where they were created to a server that makes them accessible to users on the Internet.

G Gantt chart: a project planning/management tool that charts time on the horizontal axis, and tasks and activities

on the vertical axis.

Generation X: people born between 1965 and 1980. Generation Y (“Millennials”): people born between 1981 and 2000. Governance: the function of ensuring that the enterprise’s IT activities match and support the organization’s

strategies and objectives. Governance is very often associated with budgeting, project management, and

compliance activities.

Gramm–Leach–Bliley Act: an act passed by Congress that has provisions to protect consumers’ personal finan- cial information held by financial institutions.

Grid computing: the use of multiple computing resources to leverage combined processing power. Usually associated with scientific applications.

H HIPAA (Health Insurance Portability and Accountability Act): regulations passed by Congress promoting the

privacy and security of medical records.

HRIS (Human Resources Information System): HR software.

308 Glossary

I IDS (Intrusion Detection Systems): security hardware/software that identifies suspicious traffic (i.e., potential

security threats) based on patterns of activity.

IM: instant message. Incident response: the response of an organization to a disaster or other significant event that may significantly

affect the organization, its people, or its ability to function productively.

Infrastructure as a Service (IaaS): the use of typical infrastructure components (e.g., data centers, servers, network computers) from a third-party provider as opposed to purchasing for on-premise installa-

tion/use.

Internet Corporation for Assigned Names and Numbers (ICANN): an internationally organized, nonprofit corporation that has responsibility for IP address space allocation, domain name system management, and root

server system management functions.

Interoperability: the ability for two (or more) components of technology to interface and work together. Intranet: a private web site available only to those within a company or organization. Intrusion Detection Systems (IDS): security software that identifies suspicious traffic (i.e., security threats)

based on patterns of activity.

Intrusion Prevention System (IPS): security software that not only detects malicious activity (like an IDS), but also takes action to halt it.

IDS (Intrusion Detection Systems): security software that identifies suspicious traffic (i.e., security threats) based on patterns of activity.

IPS (Intrusion Prevention System): security software that not only detects malicious activity (like an IDS), but also takes action to halt it.

ISO 17799: an internationally recognized information security standard. ISO 270001: international information security standard against which organizations can seek independent

certification of their Information Security Management Systems.

ISO 9000: a standard framework for quality management throughout the processes of producing and delivering products and services.

ISP (Internet Service Provider): a company that provides connectivity to the Internet. ITIL (IT Infrastructure Library): a set of guidelines for developing and managing IT operations and services.

K Key loggers: small applications that reside on a computer to record key strokes, usually installed without the

knowledge or consent of the user, and considered to be malware and spyware.

Kick-Off meeting: the meeting that launches a project. Activities may include team assignments, project charter, objectives review, among others.

L LAN (Local Area Network): a network of computers that are physically connected within a single site (or cam-

pus) without the use of telecomm lines.

LDAP (Lightweight Direct Access Protocol): a subset of the X.500 and DAP standards for directory services. Lease: an arrangement where a third party provides a piece of equipment for a defined period of time at an agreed

upon rate.

Local Area Network (LAN): a network of computers that are physically connected within a single site (or cam- pus) without the use of telecomm lines.

Locking down: configuring an operating system to limit the types of activities the user can do (e.g., configuration changes, software installations, etc.).

309Glossary

M M&M security model: security model designed to make a system “hard on the outside and soft in the middle.” Malware: general term for software designed to damage a computer or computer system. Spyware, adware, and

viruses are all considered forms of malware.

Mashups: two distinct functions or applications merged into a single one. Microblogging: small text or multimedia messages sent to subscriber lists. Middleware: software that connects other software. Milestone: a point in a project that represents the completion of an important sequence of key tasks and activities. Millennials: (“Generation Y”) people born between 1981 and 2000. Mission statement: explains the fundamental purpose of the company or organization. Mobile device management (MDM): tools that provide capabilities like device and app inventory, feature lock-

down, device configuration, remote lock and wipe, encryption, extensive logging.

Multiple Tier Licensing: a software licensing model that licenses the server portion of an application as well as the client portion.

Multiple Use Licensing: a software licensing model that allows an individual software license to be used on more than one device. Additional device(s) typically refers to a laptop computer or a home computer.

N Network Access Control (NAC): solution for granting access to network resources based upon authentication of

the user and the device.

Non-Perpetual Licensing (Subscription licenses, Annual licenses, Renewal licenses): a software licensing model that requires the license to be renewed periodically, typically on an annual basis.

O Object-Oriented Programming (OOP): a methodology or a method that defines how you write a software

program in a very specific way. Rather than have a series of commands that specify certain actions, objects

interact with each other. Cþþ is an object-oriented programming language; C is not. OCTAVE (Operationally Critical Threat, Asset, and Vulnerability Evaluation): a method of performing a

risk analysis developed by CERT.

OFAC (Office of Foreign Assets Control): part of the U.S. Department of Treasury that administers and enforces economic sanctions programs primarily against countries and groups of individuals, such as terrorists and

narcotics traffickers.

Off-shore Outsourcing: the process of a domestic company arranging with one or more overseas third parties to provide services that the first company could provide but chose not to.

OLTP: Online Transaction Processing. On-demand computing: providing computing resources as they are needed, as opposed to the traditional full-

time basis. Also sometimes referred to as “utility computing.” Usually associated with cloud computing.

Open Source Software (OSS): software created by the worldwide user community. Open source software is generally free, can be modified by anyone, and usually doesn’t have any single “owner.”

Operating system: software that manages computer hardware and resources, and provides common services for applications to run. Examples include Mac OS, Linux, Windows, Android, iOS, etc.

Operating expense: a financial expenditure for something whose value is gone in a short period of time, typically less than a year. Also used for items that have a longer life, but are relatively inexpensive (below a threshold set

by Accounting).

310 Glossary

Operating lease: a lease for the rental of equipment for specifiedperiods of time that are shorter than the total expected service lives of that equipment, and where ownership of the equipment is held by lessor during and after the lease.

OSS (Open Source Software): software created by the worldwide user community. Open source software is generally free, can be modified by anyone, and usually doesn’t have any single “owner.”

Outsourcing: the process of a company arranging with one or more third parties to provide services that the first company could provide but chose not to.

P Page hijacker: a form of malware that changes a browser’s default home settings, search settings, and such to

point to other sites.

Patriot Act: U.S. legislation that has a number of requirements for financial institutions in regard to verifying customers’ identities and determining whether the customer appears on any list of known or suspected terror-

ists or terrorist organizations.

PD (Position Description): detailed description of a specific role in the company. PDCA (Plan, Do, Check, Act): continuous improvement cycle originally developed by Walter Shewhart in the

1930s.

Per seat licensing: a software licensing model that requires a license for any user connecting to an application. Per server licensing: a software licensing model that requires a license for any server running an application. Perpetual licenses: a licensing model where the licenses are purchased outright and don’t have to be periodically

renewed.

PERT chart: a type of chart used in project management, where tasks are represented as circles, and arrows between tasks are used to show the sequence and task dependencies.

PGP (Pretty Good Privacy): data encryption method. Phishing: the process of trying to obtain confidential information (e.g., credit card numbers, passwords, social

security numbers, bank account numbers, etc.) by sending e-mails that appear to be from legitimate organi-

zations but are in fact fraudulent.

PII (Personal Identifying Information): term used frequently in a number of compliance regulations and legislations to refer to types of protected information.

PIPEDA (Personal Information Protection and Electronic Documents Act): a Canadian law that regulates the collection, use, and disclosure of personally identifiable information.

PKI (Public Key Infrastructure): enables users to securely exchange data through the use of a public and a private cryptographic key pair that is obtained and shared through a trusted authority.

Plan, Do, Check, Act (PDCA): a continuous improvement methodology. Platform as a Service (PaaS): delivery of an application development platform (hardware and software) from a

third party via the Internet without having to buy and manage these resources.

PMBOK (Project Management Book of Knowledge): globally recognized standard for Project Management, from the Project Management Institute (PMI), which provides practices, tools, and techniques that can be used

in most projects.

PMO (Project Management Office): a function that oversees all projects within an organization. Responsibil- ities may also include setting standards (like for methodologies, document formats, etc.), defining best

practices, etc.

PMP (Project Management Professional): a certification awarded by the Project Management Institute to individuals who have met the established minimum requirements in knowledge, education, experience, and

service in the discipline of project management.

Podcasting: making digital media files available for download and playing. Position Description (PD): a relatively detailed description of a specific job function.

311Glossary

Pretty Good Privacy (PGP): data encryption method. Privacy and Electronic Communications Directive: the European Union’s directive that covers many aspects

of electronic communications such as security of data and networks and guaranteeing the privacy of

communications.

Private cloud: the leveraging of very large IT environments to essentially offer on-demand/cloud-like offerings to their internal customers and subsidiaries, as a way to provide services in a more efficient, flexible, and

scalable manner.

Productivity tools: common desktop applications such as word processing, spreadsheets, and presentation. Productivity tools are either sold in suites or as stand-alone components.

Project charter: a project management document that defines a project scope, objectives, benefits, assumptions, etc. May also identify team assignments, project sponsor, time and cost estimates and constraints, and areas

that are out of scope.

Project Management Book of Knowledge (PMBOK): globally recognized standard for Project Management, from the Project Management Institute (PMI), which provides practices, tools, and techniques that can be used

in most projects.

Project Management Institute (PMI): a professional association for project management professionals. Project Management Office (PMO): a function that oversees all projects within an organization. Responsibil-

ities may also include setting standards (like for methodologies, document formats, etc.), defining best prac-

tices, and so on.

Project Management Professional (PMP): a certification awarded by the Project Management Institute to individuals who have met the established minimum requirements in knowledge, education, experience, and

service in the discipline of project management.

Project manager (PM): the person responsible for completing the project on time, within budget, and to an agreed scope.

Project milestones: significant events or the completion of a phase within a project. Project plan: documentation of a project’s projected activities including timing, resource assignments, assump-

tions, constraints, costs, etc.

Project sponsor: the individual whose support and approval is required for a project to start and continue. May also be the person who initially proposed the project.

Project stakeholder: any individual or organization who may be affected by a project and/or benefit from it. Public cloud: cloud services that are available to any individual or organization to use, for a fee.

R Recovery Point Objective (RPO): in disaster recovery planning, the age, or “freshness,” of the data available to

be restored in a disaster scenario.

Recovery Time Objective (RTO): in disaster recovery planning, the expected amount of time between the di- saster, and when services are restored.

Renewal licensing: a software licensing model that requires the license to be renewed periodically, typically on an annual basis.

Request for Information (RFI): a document issued to potential suppliers and vendors to enable them to deter- mine if they can meet the requirements of a project.

Request for Proposal (RFP): document issued to suppliers asking them to submit detailed proposals pricing and other information.

Request for Quotation (RFQ): document issued to suppliers asking them to submit detailed proposals pricing and other information.

Return on Investment (ROI): a calculation of the net benefits of a project against the total costs.

312 Glossary

RFI (Request for Information): a document issued to potential suppliers and vendors to enable them to deter- mine if they can meet the requirements of a project. The RFI helps narrow down the list of vendors that would

get the RFP.

RFID (Radio Frequency Identification): technology used to identify and track items (e.g., inventory, consumer products) using very small components known as “tags”.

RFP (Request for Proposal): document issued to suppliers asking them to submit detailed proposals pricing and other information.

RFQ (Request for Quotation): document issued to suppliers asking them to submit detailed proposals pricing and other information.

ROI (Return on Investment): Return on Investment. Rootkits: a form of malware that is particularly difficult to detect because they are activated before the operating

system.

RPO (Recovery Point Objective): in disaster recovery planning, the age, or “freshness,” of the data available to be restored in a disaster scenario.

RTO (Recovery Time Objective): in disaster recovery planning, the expected amount of time between the disaster, and when services are restored.

Rule of Least Privilege: users should be granted only the least amount of access to the system, and for the least amount of time necessary, as is authorized and required for their job.

S SaaS (Software as a Service): a software deployment model where a provider licenses an application to

customers for use over the Internet, without requiring purchase and installation of the licenses.

Sarbanes–Oxley: law passed by the U.S. Congress to regulate the integrity of financial statements. SB-1386: California state law requiring organizations that maintain personal information about individuals to

inform those individuals if the security of their information is compromised.

SCAMPI (Standard CMMI Appraisal Method for Process Improvement): appraisal process for the CMMI process improvement methodology.

Scope Creep: adding features and functionality (project scope) without addressing the effects on time, costs, and resources, or without customer approval.

Search Engine Optimization (SEO): techniques to help ensure that a web site appears as close to the first position on a web search results page as possible.

Security Incident Response Team (SIRT): a formal group assembled within a company to respond to security breaches.

SEO (Search Engine Optimization): techniques to help ensure that a web site appears as close to the first position on a web search results page as possible.

Service Level Agreement (SLA): a statement to customers or the user community about the service the IT department will provide. It can refer to a variety of metrics, such as performance, up-time, resolution time,

and so on.

Single Sign-On (SSO): a security solution that allows a user to authenticate once, and then have access to all systems and resources for which he has been granted permission. Eliminates the need to remember

multiple IDs and passwords. Considered a convenience not only for users, but for system administrators

as well.

SIRT (Security Incident Response Team): a formal group assembled within a company to respond to security breaches.

Six Sigma: process improvement methodology. SLA (Service Level Agreement): a statement to customers or the user community about the service the IT

department will provide. It can refer to a variety of metrics, such as performance, up-time, resolution time, etc.

313Glossary

Slack time: how much a noncritical-path task on a PERT chart can be delayed without impacting the project as a whole.

Social engineering: obtaining or attempting to obtain otherwise secure data with fraud and deceit by tricking an individual into revealing confidential information.

Social networking: the use of technologies to turn communication into an interactive dialogue, and to allow the creation and exchange of user-generated content.

Software as a Service (SaaS): a software deployment model where a provider licenses an application to cus- tomers for use over the Internet, without requiring purchase and installation of the licenses.

Spoofing: the process of forging an e-mail address or IP address. Usually used by hackers for illicit purposes like fraudulently entering a computer or computer network.

Spyware: software placed on a computer that monitors a user’s activity. Usually installed without the knowledge or consent of the user, and considered to be malware.

SSO (Single Sign-On): a security solution that allows a user to authenticate once, and then have access to all systems and resources for which he has been granted permission. Eliminates the need to remember multiple

IDs and passwords. Considered a convenience not only for users, but for system administrators as well.

Standard CMMI Appraisal Method for Process Improvement (SCAMPI): appraisal process for the CMMI process improvement methodology.

Subscription licensing: a software licensing model that requires the license to be renewed periodically, typically on an annual basis.

T T&M Service (Time-and-Material): a hardware/software support model that requires the customer to pay for

both the technician’s time as well as any parts required.

TCO (Total Cost of Ownership): refers to the fact that there are many more items related to the cost of tech- nology besides the initial price of the hardware and the software (e.g., training, support, etc.).

Teleworking: working from a location other than the company office, often using communications applications (like IM, WiFi, and cloud computing apps) to interact with coworkers.

Terms and Conditions (Ts and Cs): section of a contract with a vendor that deals with items such as service level guarantees and hardware and software specs.

Time-and-Material service (T&M service): a hardware/software support model that requires the customer to pay for both the technician’s time as well as any parts required. Similar to a car repair bill.

Total Cost of Ownership (TCO): refers to the fact that there are many more items related to the cost of tech- nology besides the initial price of the hardware and the software (e.g., training, support, etc.).

Trojan horse: software that appears to be an application but is, in fact, a destructive program. Ts and Cs (Terms and Conditions): section of a contract with a vendor that deals with items such as service level

guarantees and hardware and software specs.

U Unified messaging: the term applied to integrating voice mail and e-mail systems. USB (Universal Serial Bus): a standard used for connecting small devices (e.g., digital camera, flash memory,

headset).

Utility tools: software to help optimize, manage, or configure the computer environment. Examples include backup, monitoring, management, and administration file compression, file conversion.

V Value Added Reseller (VAR): a company that provides additional services (e.g., installation, upgrade) to prod-

ucts they sell.

314 Glossary

VAR (Value Added Reseller): a company that provides additional services (e.g., installation, upgrade) to products they sell.

VDI (Virtual Desktop Infrastructure): an environment where desktop computers are virtualized, moved to the data center, and remotely accessed by end users, typically with thin-client devices.

Virtual Desktop Infrastructure (VDI): an environment where desktop computers are virtualized, moved to the data center, and remotely accessed by end users, typically with thin-client devices.

Virtual Machine (VM): software that allows you to take a single physical device (e.g., one PC) and run multiple instances of operating systems on it.

Virtual Private Cloud (VPC): a hybrid of the public and private clouds where the cloud provider logically segregates your resources from its other customers.

Vision statement: a company document that takes a mission statement to the next level by outlining what the organization wants to be; it focuses on the future and serves as a source of inspiration for employees.

VM (Virtual Machine): software that allows you to take a single physical device (e.g., one PC) and run multiple instances of operating systems on it.

Voice over IP (VOIP): a technology for using IP networking for phone calls. VOIP (Voice over IP): a technology for using IP networking for phone calls. VPC (Virtual Private Cloud): a hybrid of the public and private clouds where the cloud provider logically

segregates your resources from its other customers.

VPN (Virtual Private Network): a method of establishing a secure connection between two devices over the public Internet.

W WAN (Wide Area Network): a network that covers a large geographical area. War room: a room provides team members a place to work on a project that is separate from their regular

work area.

Web 2.0: a second generation of Internet-based tools and applications that facilitate communication, collabora- tion, connectivity, sharing, etc.

White hats: hackers are interested in security flaws as a way of identifying how security can be improved, and how systems can be better protected; sometimes called “ethical hackers.”

White list: a list of e-mail originators (e-mail and IP addresses) whose messages should always be considered legitimate.

Wide Area Network (WAN): a network that covers a large geographical area. Worm: a form of malware as a standalone program (opposed to viruses that attach themselves to other objects).

Z Zero Day Attack: a malware attack that takes advantage of a software vulnerability for which the vendor has not

released a patch.

315Glossary

This page intentionally left blank

Index

Note: Page numbers followed by b indicate boxes, f indicate figures and t indicate tables.

360 Reviews, 51, 51t

A Accenture, 158

Access control, security technologies, 215

Access database, DBMS, 135

Access issues, Help Desk, 277

Accessories

consumerization support issues, 272

mobile user support, 274, 275

Access reviews

ongoing maintenance, 221

security solutions, 218

Accountability

employee performance reviews, 46

staffing and security, 223

Accounting Department

BCP, 261

budgeting process, 26, 165, 166

capital expenditures, 167

Closeout Report, 122

cloud computing, 148–149

company policies, 168

customer needs, 12

evaluation matrix, 177

hiring help, 66

IT manager decisions, 27

IT manager duties, 2

money gray issues, 168

“people to know,”, 24

politics, 7

project launch, 116

project management, 109

stakeholder identification, 108

technology refresh cycle, 202

vendor support, 174

Accounting and Finance users, project stakeholders, 108

Account provisioning, identity management, 220

Accounts Receivable and Payables, project stakeholders,

108

Account usage

ongoing maintenance, 221

security technologies, 216

ACD, see Automatic Call Distribution (ACD)

Active Directory, 143, 144

ACT model, disaster recovery plan, 259–260

Adelphia, 226

Adobe Connect, 91, 180

Advertising options, PD

internal posting, 77

job/recruiting fairs, 79

networking, 77–79

networking effectiveness, 78–79

personal contacts, 78

popular web sites, 77

print, 79

professional contacts, 78

web posting issues, 77

Adware, 208, 224

AES encryption standard, 222

Agendas, project meetings, 128

Agile development, 34

Agile meetings, 34

Altiris, 143, 280

Amazon cloud computing, 148

Android, 296

Announcements

intranet uses, 294–295

webcast, 269

Annual Licensing, 131, 146

Application assessment

disaster recovery scope, 250–252, 251f, 252f

new job basics, 18–20

Application development, IT Department value, 9

Application inventory, technical environment, 193–194

Application software, IT issues, 201

Apps

as connectedness technology, 289

mobile devices and connectivity, 296–297

Asset management

basic considerations, 198–199

definition, 196–199

Attribute, directory structure, 156

Audits

Information Systems Audit and Control Association, 239

security audit, 209–210

working with auditors, 242–243

Authentication

challenge–response, 219

identity management, 220

methods, 220

security solutions, 219–220

SSO, 156, 219–220

two-factor, 219

IT Manager’s Handbook.

© 2012 William Holtsnider & Brian D. Jaffe. Published by Elsevier, Inc. All rights reserved. 317

Authorization levels, security solutions, 218–219

Automated alerts, as proactive solution, 269

Automated reports, as proactive solution, 269

Automatic Call Distribution (ACD), 282

Availability, CIA model, 208

Awareness training, users, 271

B Baby boomers, generation differences, 58t, 60t

Backdoor Trojans, 224

Background checks, 97, 223

Backup tapes, disaster recovery plan, 256

Basel Committee on Banking Supervision (BCBS), 229

Basel II, 229–230

BCBS, see Basel Committee on Banking Supervision (BCBS)

BCP, see Business Continuity Planning (BCP)

Benefit plan enrollment, intranet uses, 294–295

Benevolent dictator, 141

BestBuy, 225

Bidding, vendor management, 175

Bill 198 (Ontario, Canada), 228

Billing and invoicing, cloud computing, 151

BlackBerry (RIM), 296

Black-hat hackers, 208, 211–212

Black List, 154

Bliley, Thomas, 231

Blogs, as connectedness technology, 289

Bloomberg, Michael, 4

Body language, 33, 92

Boss relationship

with IT Manager, 17–18

view of users, 265

“Breaking the ice,” 15

Brin, Sergey, 95, 209

Bring Your Own (BYO) Policy, 273, 288–289

Brute force method, 27

Budgeting factors

department workload, 170

hardware maintenance, 172–173

key factors, 170–173

software maintenance, 171

staff, 171

technological change, 171

Budgeting issues, see also Cost considerations; Money

first 100 days, 26

intranet uses, 294–295

kick-off meeting, 116

off-track projects, 125–126

project funding, 131

Budgeting process

approval, 165–166

budget reviewers, 164–165

chargebacks, 164

estimations, 165

items, 162–163

items to tracks, 162–163

overview, 161–167

revisions, 166–167

tracking, 166–167

Burnout

associated problems, 36

avoiding/monitoring, 36–37

employees, 36

Business Applications

OS selection, 138

as software type, 136

Business Continuity Planning (BCP)

basic issues, 261

and compliance, 243

definition, 260

disaster recovery, 260–261

Business-related degrees, candidate selection, 96

Business Software Alliance, 145

Buy vs. lease decision

basic considerations, 168–170

operating vs. capital lease, 169

person deciding, 170

pros and cons, 169, 169t

BYO, see Bring Your Own (BYO) Policy

C Call centers, 183, 278

Call tracking

Help Desk, 278–279, 282

knowledge base, 279

user satisfaction surveys, 280

Candidate selection

ability to learn, 94

background checks, 97

business-related degrees, 96

certification value, 94–95

common mistakes, 98–99

education, 95–97

education’s direct value, 96

education’s indirect value, 96

hard sciences-related degree, 97

high-volume response, 85

interview guidelines, 86

level of interview, 84

list narrowing, 84–86

multiple interviewers, 88–89

multiple perspectives, 89b

non-technical questions, 87–88

off-limits questions, 88

318 Index

overqualified candidates, 85–86

professional references, 97–98

profile/personality tests, 90b

project teams, 126

question preparation, 87–88

rank criteria, 93–94

reference checks, 97–98

remote interviews, 91–92

requirements flexibility, 93–94

résumé reviews, 83–84

salary range, 99–101

similar experience, 92–93

skill set, 92

soft sciences-related degrees, 97

technical courses, 97

technical interviews, 89–93

telephone screening, 84

30 qualified candidates, 85

CAP, see Certified Authorization Professional (CAP)

Capability Maturity Model Integration (CMMI), 240

Capital expenditure

company policies, 168

details, 167–168

gray areas, 168

vs. operating expense, 115, 167–168

Capital investment, vendor evaluation matrix, 177

Capital lease, 169

CareerBuilder.com, 77

Carrier connections, technical environment, 191–192

Casper (JAMF), 143, 280

Catastrophic disasters, DR plan, 259

CERT, 211

Certificates, security defenses, 222

Certification

checking value, 95

employee training, 41

job requirement flexibility, 94

position description, 74

project manager, 105

value, 94–95

Certified Authorization Professional (CAP), 223

Certified Information Systems Security Professional

(CISSP), 41, 223

Certified Novell Engineer (CNE), 41, 94

Certified Secure Software Lifecycle Professional (CSSLP), 223

Chain letters, e-mail management, 153–154

Challenge–response authentication, 219

Change Request (CR), 212

Chargebacks, 164

Chatter.com, as connectedness technology, 289

Chemistry, Four C’s of Hiring, 70

Chief Security Officer (CSO), 212

CIA, see Confidentiality, Integrity, Availability (CIA) model

Circumstance, Four C’s of Hiring, 69

CISSP, see Certified Information Systems Security Professional

(CISSP)

Clause 49 (India), 228

CLERP-9 (Australia), 228, 233

Client/server software type, 136

Clinton, Bill, 126–127

Closeout Report

additional accomplishments, 122

bad news, 122

follow-up activities, 122

as project plan guide, 112

writing, 121–122

Cloud computing

basic considerations, 150–152

benefits and challenges, 152t

non-perpetual licensing, 146

overview, 148–152

private vs. public, 149–150

pros and cons, 150t

types, 148–149

CMMI, see Capability Maturity Model Integration (CMMI)

CNE, see Certified Novell Engineer (CNE)

COBIT, see Control Objectives for Information and Related

Technology (COBIT)

Code name, project management techniques, 127

Collaboration

connectivity tool issues, 298–299

employee performance reviews, 46

management style, 4

Command and Control management style, 4

Commitment, candidate selection, 95

Committee of Sponsoring Organizations (COSO), 226

Communication plan

disaster recovery, 253–254

mobile user support, 275

Communication skills, employee performance reviews, 45

Communication with team

Agile meetings, 34

focused employees, 32–34

goal achievement, 32–33

goals and objectives, 32

listening to employees, 33

meeting frequency, 33–34

project meetings, 34

staff questions, 33

Company objectives, project management, 107

Company-owned equipment, BYO policies, 288–289

Company values, team management, 34–35

Company-wide layoffs, alternatives, 57b

Complaint desk, see Help Desk

319Index

Compliance, see also Policies

Basel II, 229–230

disaster recovery and business continuity, 243

Dodd–Frank Act, 233

electronic discovery, 242

employee performance reviews, 46

Gramm–Leach–Bliley Act, 231–232

information and records retention, 242

Massachusetts Data Protection Law, 230–231

non-compliance victims, 227

Office of Foreign Assets Control, 233

outsourcing, 244

overview, 226–227

personally identifiable information, 226–227

PIPEDA, 233

policies and procedures, 243

Privacy and Electronic Communications Directive

(European Union), 234

rules, 227–234

Sarbanes–Oxley, 227–228

US securities, 232

working with auditors, 242–243

Compliance benefits

control mechanisms, 237

documentation, 237

employee education, 237–238

evidence maintenance, 238

overview, 237–238

Compliance processes

CMMI, 240

control mechanisms, 236

COSO, 226

employee education, 236

evidence maintenance, 236

ISO 9000, 240–241

IT governance, 238–239

IT Infrastructure Library, 240

methodologies and frameworks, 238–239

overview, 234–236

policy documentation, 235

Six Sigma, 241–242

Concurrent User Licensing, 146

Conference calling services, as proactive solution, 268

Conference calls, project meetings, 129

Conference room reservations

intranet uses, 294–295

as proactive solution, 269

Confidentiality, Integrity, Availability (CIA) model, 208

Connectivity

basic considerations, 287

benefits and challenges, 290–291, 290t

benefits of Web, 293–294

BYO policies, 288–289

effects on IT Manager, 298–302

e-mail checking frequency, 302b

empowered users, 292–293

focus vs. distraction, 301–302

goals, 301

handheld hardware, 297–298

handling new technologies, 287–288

intranet uses, 294–295

mobile device OSes/apps/hardware, 296–297

mobile device uses, 295–296, 297–298

new technologies, 289–290

real-world applications, 293–298

social media uses, 295–296

tool implementation, 299–301

tool use considerations, 298–299

tool use guidelines, 300–301

tool use opportunities, 301

wisdom of crowds, 293

Constraints, project management, 109–110

Consultants

cost considerations, 114

vs. full-time employees, 70–74

project planning, 113

pros and cons, 72t

Consumerization of IT

BYO policies, 273

handling, 272

overview, 271–273

security issues, 273

support depth and breadth, 273

support issues, 272–273

Continuity, Four C’s of Hiring, 70

Contracts

vs. position descriptions, 75

review with vendors, 175–176

Control mechanisms

compliance benefits, 237

identification, 236

Control Objectives for Information and Related Technology

(COBIT), 239

Convenience, vs. security vs. privacy, 207

Conversation topics, one-on-one meetings, 16

Coordination with others, employee performance reviews, 46

Corporate Governance Code (Germany), 228

Corporate Law Economic Reform Program Act (2004),

see CLERP-9 (Australia)

Corporate scandals, 227

COSO, see Committee of Sponsoring Organizations (COSO)

Cost considerations, see also Budgeting issues; Capital

expenditure; Money; Operating expense

consumerization of IT, 273

320 Index

disaster recovery facilities, 255

employee training, 39, 42

ERP implementation, 158

Four C’s of Hiring, 69

full-time vs. consultants, 71

information sharing with users, 267

off-track projects, 125–126

OSS, 142

project funding, 130–131, 132

project management, 109

project meetings, 129

recruiters, 82

tough economic times, 179–180

vendor evaluation matrix, 177–178

Courtesy interview, 68

CR, see Change Request (CR)

craigslist.org, 77

Crisis communication services, DR communication plan, 254

Critical path, project progress tracking, 118–119

Crowdcast.com, as connectedness technology, 289

Crowdsourcing

basic concept, 293

as connectedness technology, 289

connectivity tool issues, 298–299

CSO, see Chief Security Officer (CSO)

CSSLP, see Certified Secure Software Lifecycle Professional

(CSSLP)

Customer needs

customer as user, 264

and employee training, 41

IT strategy development, 12

OS selection, 139

Customer service, benefits of Web, 294

D Database Management System (DBMS), 135

Databases

DR data replication, 256

ERP, 157

first 100 days, 23

Data loss, DR scope, 252

Data protection, cloud computing, 151

Data Protection Directive (European Union), 234

Data recovery, cloud computing, 151

Data redundancy, cloud computing, 151

Data replication, disaster recovery plan, 256

Data retention, cloud computing, 151

Data storage

cloud computing, 151

disk/tape encryption, 222

off-site, 256

technical environment, 192

DB2 (IBM), DBMS, 135

DBMS, see Database Management System (DBMS)

Decision-making techniques

project management, 122–123

types, 122–123

Deloitte, 158

Demilitarized zone (DMZ), 190

Department objectives, project management, 107

Department of Defense (DoD), 215

De-perimeterization techniques, 215

Deployment, software management, 142–143

Depreciation

budget items, 163

company policies, 168

DES encryption standard, 222

Desktop devices

consumerization of IT, 272

software management, 144

Desktop management, Help Desk, 280

Development plan, performance reviews, 52–53

Development tools, software types, 136

Dice.com, 77

Digital certificates, 222

Direct funding sources, project stakeholders, 109

Directory entries, directory structure, 156

Directory Services, 156–157

Disaster Recovery (DR)

ACT model, 259–260

backup tapes, 256

basic considerations, 247

BCP, 260–261

communication plan, 253–254

and compliance, 243

data replication, 256

definition, 260

documentation, 254

facilities considerations, 255–256

good planning benefits, 261

hardware availability, 257

incident response, 260–261

IT facilities, 254–256

off-site data storage, 256

plan creation, 253–260

plan review/update, 258

post-disaster issues, 259

real estate, 254–256

regional/catastrophic disasters, 259

scope determination

application assessment, 250–252, 251f, 252f

basic considerations, 248–252

data value, 252

key questions, 248–249

321Index

Disaster Recovery (DR) (Continued)

RPO, 249, 249f

RTO, 249, 249f

testing, 258

Disciplinary problems, employee performance,

54–57

Disk Cloning, software management, 143

Disk image, software management, 143

Distraction issues, connectivity, 301–302

Distributions, 142

Distros, 142

DMADV, 241

DMAIC, 241

DMZ, see Demilitarized Zone (DMZ)

Documentation

compliance benefits, 237

compliance policies, 235

disaster recovery plan, 254

first 100 days, 23

infrastructure, 189–190, 195–196

server environment, 192

trouble tickets as, 278

DoD, see Department of Defense (DoD)

Dodd–Frank Act, 233

“Downtime,” connectivity issues, 290t

DR, see Disaster Recovery (DR)

DreamWorks Animation, 107

E eBay, 225

Education

candidate selection, 95–97

compliance process, 236

direct value to job, 96

e-mail usage, 153

hidden benefits, 237–238

indirect value to job, 96

job requirement flexibility, 93

position description, 76

user training, 271

Electronic discovery, 242

E-mail

appropriate use, 155

archiving, 155

checking frequency, 302b

electronic discovery, 242

encryption, 222

enterprise applications, 136, 152–153

harassment, 154

junk mail, 153–154

management, 153–155

mobile user support, 274

self-service Help Desk, 277

size limits and retention, 154–155

threat types, 225

usage statistics, 153

user education, 153

viruses, 154

Employee agreements, training costs, 42

Employee burnout

avoiding/monitoring, 36–37

employee burnout, 36

team management, 36

Employee discounts, intranet uses, 294–295

Employee focus

Agile Meetings, 34

goal achievement, 32–33

goals and objectives, 32

listening to staff, 33

meeting frequency, 33–34

priorities, 32

project meetings, 34

staff input, 33

team communication, 32–34

team management, 32–38

Employee performance, see also Performance reviews

disciplinary problems, 54–57

evaluation areas, 44–47

layoff alternatives, 57b

layoffs, 55–57

overview, 43–57

project management, 133

salary review, 53–54

terminations, 54–57

Employee resources, project planning, 113–114

Employee training

basic considerations, 39–43

certification, 41

compliance process, 236

cost, 39

departures after, 41–42

hidden benefits, 237–238

identifying employees, 40–41

maximizing value, 42–43

morale, 40

needs, 39–40

nontechnical training, 42

scheduling demands, 40

security impact, 214

Empowered users, connectivity issues, 292–293

Emulators, OS, 139

Encouragement, connectivity tool issues, 298–299

Encryption, security defenses, 222

End User Licence Agreement (EULA) [Microsoft], 144b

322 Index

End-user upgrades, as proactive solution, 269

Enron, 226

Enterprise applications

connectivity tool implementation, 300

directory services, 156–157

e-mail, 152–153

overview, 152–157

scalability issues, 178

as software type, 136

unified messaging, 155–156

Enterprise Resource Planning (ERP)

as capital expense, 167

client/server software, 136

cost management, 180

disadvantages, 159

enterprise applications, 136

implementation costs, 158

implementation decisions, 158–159

implementation issues, 157–158

implementation requirements, 158

overview, 157–159

project management, 104

TCO, 142

value, 157

Ernst & Young, 158

ERP, see Enterprise Resource Planning (ERP)

Escalating calls, Help Desk procedures, 276–277

Ethics

employee performance reviews, 46

outsourcing, 244

EULA, see End User Licence Agreement (EULA) [Microsoft]

European Union

Data Protection Directive, 234

Privacy and Electronic Communications Directive, 234

Evaluation matrix (vendors)

functionality, 177

interoperability, 179

performance, 178

price, 177–178

product market position, 179

required training, 178

scalability, 178

services, 178

support and service, 179

typical components, 177–179

viability, 178

Evidence maintenance

compliance process, 236

hidden benefits, 238

Exchange (Microsoft)

client/server software, 136

cloud computing, 148–149

ExecuNet.com, 77

Expense item

company policies, 168

gray areas, 168

Experienced workers

job requirement flexibility, 93

vs. “newbies,” 61t

position description, 76

similar experience of candidates, 92–93

Experimentation, connectivity tool issues, 298–299

External employees, project planning, 113–114

External hires, vs. internal, 68–70

External referrals, as hiring starting point, 68

External use software licenses, 146

F Facebook, 44, 290, 290t, 296, 299, 302

Face-to-face project meetings, 129

Facilities

disaster recovery, 248, 254–256

user identification, 264

Fair and Accurate Credit Transactions Act (FACTA), 231

Fair Credit Reporting Act (FCRA), 231

FASB, see Financial Accounting Standards Board (FASB)

Federal Deposit Insurance Corporation, 229

Federal Reserve System, 229

Federated identity, 220

Feedback

IT service, 268

leadership during tough economy, 181

FileMaker Pro, DBMS, 135

Finance Department

budget approval, 165

BYO policies, 273

capital vs. operating expenses, 115, 167

company money policies, 168

consultant pros and cons, 72t

consumerization of IT, 271, 272

disaster recovery committee, 249

employee education, 238

full-time vs. consultants, 70

internal resources costs, 115

intranet software downloads, 143

IT manager duties, 1, 6

outsourcing, 186

“people to know,” 24

policies and procedures, 243

stakeholder identification, 108

user identification, 264

vendor management, 176

Financial Accounting Standards Board (FASB), 169

Financial Instruments and Exchange Law (Japan), 228

323Index

Financial Privacy Rule, GLB, 231

Financial scandals, 226, 237–238

Financial Security Law of France, 228

Firewall, 220

First-day issues

new job basics, 14

war stories, 19b

First 100 days

advertising personal offerings

asking questions, 22

basic considerations, 21–22

perspective, 21–22

preliminary research, 21

budgeting, 26

developing relationships, 24

HR issues, 25–26

initial decisions, 26–27

introductory meetings, 24–25

organization dynamics, 20–21

project inventory, 22–23

status quo evaluation, 23

Fiscal year, budgeting process, 161

Fixed asset, expense gray areas, 168

Flexibility

consumerization of IT, 272

employee performance review, 45

job requirements, 93–94

unified messaging, 156

user relationships, 270

“Flying Pig” award, 127b

Focus issues

connectivity, 301–302

management vs. leadership, 13

Follow-up, information collection, 268

Four C’s of Hiring, 69b

Four directions of management, characteristics,

7–8, 8f

Free software, GNU definition, 144b

Friendster, 290

Full-time employees

vs. consultants, 70–74

project planning, 113

pros and cons, 73t

resistance by companies, 74b

Funding, project management

budget source, 131

cost estimation, 130–131

cost justification, 132

overview, 130–132

total cost, 131

Funding sources, project stakeholders, 109

Fusion (Oracle), enterprise applications, 136

G Gadgets, as connectedness technology, 289

Gantt Chart

example, 119f

progress tracking, 117

project milestones, 119

project progress tracking, 118

Gates, Bill, 35, 95

Generational issues

basic considerations, 57–62

cross-generation management, 58–62

differences, 58t, 60t

experienced vs. “newbie” workers, 61t

multigenerational workforce advantages, 59–62

Generation X, 58t, 60t

Generation Y (“Millenials”)

generation differences, 58t, 60t

trends, 59

user security training, 213

Geo-location technology, 290t

Giuliani, Rudy, 259

Glass–Steagall Act, 232

GLB, see Gramm–Leach–Bliley (GLB) Act

Global Crossing, 226, 227

GNU free software, 144b

Google Apps, 148

Google Docs, 148

Google Sites, 149

Google Talk, 91

GoToMeeting (Citrix), 180, 290t

Governance

compliance processes, 238–239

COSO, 239

Government agencies, project stakeholders, 109

Gramm, Phil, 231

Gramm–Leach–Bliley (GLB) Act, 231–232

Green indicators, project progress tracking, 121

Grid computing, 149

Grove, Andy, 4

H Hackers

black hats, white hats, 208, 211–212

security assessment, 211

SSO, 219–220

Handheld devices

end-user upgrades, 269

hardware, 297–298

support issues, 272–273

Hands-off approach, dealing with mergers, 28

Harassment, e-mail management, 154

324 Index

Hard costs, project funding, 130

Hard sciences-related degree, candidate selection,

97

Hardware

budget items, 162

disaster recovery plan

basic considerations, 257

environment duplication, 257

environment size, 257

home equipment, 257

flexible approach to, 270

handheld devices, 297–298

job requirement flexibility, 94

mobile devices and connectivity,

296–297

project costs, 131

vendor evaluation matrix, 178

Hardware configurations, IT issues, 200

Hardware maintenance

basic considerations, 172–173

T&M contracts, 172–173

warranties, 173

HDI, see Help Desk Institute (HDI)

Health Information Technology for Economic and Clinical

Health (HITECH) Act, 229

Health Insurance Portability and Accountability Act

(HIPAA), 155, 210–211, 226, 228–229

HealthSouth, 226, 227

Help Desk

access, 277

call tracking software, 278–279

desktop management, 280

e-mail management, 154

employee training, 41

escalating calls, 276–277

information sharing with users, 267

knowledge base, 279

outsourcing, 184

overview, 275–282

procedures, 276–277

remote control, 279–280

self-service, 277–278

social engineering, 225–226

staffing, 281–282

tools, 278–280

typical activities, 276

user satisfaction surveys, 267, 280

VM uses, 140

workload measurement, 281

Help Desk Institute (HDI), 278–279

HIPAA, see Health Insurance Portability and Accountability

Act (HIPAA)

Hiring

basic considerations, 65–74

candidate selection

ability to learn, 94

background checks, 97

business-related degrees, 96

certification value, 94–95

common mistakes, 98–99

education, 95–97

education’s direct value, 96

education’s indirect value, 96

hard sciences-related degree, 97

high-volume response, 85

interview guidelines, 86

level of interview, 84

list narrowing, 84–86

multiple interviewers, 88–89

multiple perspectives, 89b

non-technical questions, 87–88

off-limits questions, 88

overqualified candidates, 85–86

professional references, 97–98

profile/personality tests, 90b

question preparation, 87–88

rank criteria, 93–94

reference checks, 97–98

remote interviews, 91–92

requirements flexibility, 93–94

résumé reviews, 83–84

salary range, 99–101

similar experience, 92–93

skill set, 92

soft sciences-related degrees, 97

technical courses, 97

technical interviews, 89–93

telephone screening, 84

30 qualified candidates, 85

consultant pros and cons, 72t

Four C’s, 69b

full-time vs. consultants, 70–74

full-time employee pros and cons, 73t

full-time employees, reluctance, 74b

help with, 66–67

HR role, 66–67

internal vs. external hires, 68–70

internal and external referrals, 68

internal hire pros and cons, 69t

justification, 67–68, 68b

position description

advertising options, 77–79

basic considerations, 74–79

vs. contracts, 75

325Index

Hiring (Continued)

example, 76f

general requirements, 75–77

recruiters

basic considerations, 79–82

current usefulness, 81b

multiple recruiters, 82

pros and cons, 80t

selection, 81–82

technical abilities, 82

timing considerations, 71–74

HITECH, see Health Information Technology for Economic

and Clinical Health (HITECH) Act

Home use licenses, 146

HR, see Human Resources (HR)

HRIS, see Human Resources Information Systems (HRIS)

Human Resources (HR)

BYO policies, 273

capital expenditures vs. operating expense, 167

connectivity and attention issues, 301

disciplinary problems, 54, 55

e-mail archiving, 155

employee performance reviews, 43–44

first 100 day issues, 25–26

full-time vs. consultants, 70

high-volume applicant response, 85

hiring role, 66–67

multigenerational workforce issues, 61

multiple interviewers, 88

negative performance reviews, 50

nontechnical employee training, 42

policy documentation, 235

professional reference checks, 98

project stakeholders, 109

recruiter pros and cons, 81

recruiter selection, 81

salary review, 53

telework programs, 38

Human Resources Information Systems (HRIS), 148–149, 185

I IaaS, see Infrastructure as a Service (IaaS)

IBM cloud computing, 148

IdeaScale.com, as connectedness technology, 289

Identity management, 220

IDS, see Intrusion Detection System (IDS)

IIHI, see Individually-Identifiable Health Information (IIHI)

IM, see Instant Messaging (IM)

Incident response

definition, 260

disaster recovery, 260–261

security defenses, 223–224

Indeed.com, 77

Indirect funding sources, project stakeholders, 109

Individually-Identifiable Health Information (IIHI), 229

Industry experience, job requirement flexibility, 94

Information collection

Help Desk, 275

methods, 267–268

Information retention, compliance, 242

Information sharing

methods, 267

with users, 266–267

Information Systems Audit and Control Association, 239

Infrastructure as a Service (IaaS), 149, 151

Infrastructure documentation

technical environment, 189–190

value, 195–196

In-house catering, intranet uses, 294–295

In-house classes, user training, 270

Innovation, performance reviews, 45

Instant Messaging (IM)

as connectedness technology, 289

connectivity issues, 290t

IT for business value, 180

mobile user support, 274

as proactive solution, 269

remote interviews, 91

telework programs, 38

Integrity, CIA model, 208

Interaction with others, employee performance reviews, 46

Interdependencies, project management, 109–110

Internal controls, security assessment, 210–211

Internal employees, project planning, 113–114

Internal hires

vs. external, 68–70

pros and cons, 69t

Internal posting, PD, 77

Internal referrals, as hiring starting point, 68

Internal resources, cost considerations, 115

Internal use software licenses, 146

International Convergence of Capital Measurement and Capital

Standards, see Basel II

International Organization for Standards, 240–241

Internet

application assessment, 251

candidate interviews, 91–92

capital expenditures, 167–168

chargebacks, 164

cloud computing, 148–149

connection as capital expense, 167–168

disaster recovery, 248, 253

firewalls, 220

handheld hardware, 297

326 Index

IDS/IPS, 220–221

IT acceptance, 301

job searching, 84

LAN, 192f

phishing, 225

project management tools, 118

recruiter business model, 81

reference checks, 98

remote interviews, 91–92

security and compliance, 205

SLAs, 284

two-factor authentication, 219

VoIP, see Voice over IP (VOIP)

WAN, 190, 191f

Internet Service Provider (ISP), 113–114, 163

Interoperability, 177, 179

Interviews

candidate selection, 84

guidelines, 86

multiple interviewers, 88–89

non-technical questions, 87–88

off-limits questions, 88

question preparation, 87–88

remote, 91–92

technical, 89–93

Intranet

as proactive solution, 269

user-downloadable software, 143

uses, 294–295

Introductory meetings, first 100 days, 24–25

Intrusion Detection System (IDS), 220–221

Intrusion Prevention System (IPS), 220–221

Invoicing, cloud computing, 151

iOS, 137, 138, 296

iPad, 137

iPhone, 10, 137, 271, 272

IPS, see Intrusion Prevention System (IPS)

ISO 9000, 240

ISO 17799, 223

ISO 270001, 223

ISP, see Internet Service Provider (ISP)

IT Department basics

Application Development, 9

BYO policies, 273

central role, 12

CEO role, 9b

consumerization of IT, 271–273

goals, 10

merger issues, 27–28

team members, 11

Technical Operations, 9

view of users, 264

IT facilities, disaster recovery, 254–256

IT Governance Institute, 239

IT Infrastructure Library (ITIL), 240

IT Manager role

basic issues, 1

connectivity issues, 298–302

first 100 days, 20–27

IT Department merger issues, 27–28

IT Department strategic value, 8–10

job benefits, 2

job drawbacks, 2–3

job pros/cons, 5

leadership vs. management, 13, 13t

management basics, 3–8

manager’s value, 10

new job basics, 14–20

responsibilities, 2–3

IT standards

flexibility, 270

technology products, 201

IT strategy development

basic considerations, 10–12

customer needs, 12

IT Department’s central role, 12

team members, 11

technology value, 11–12

iWork, productivity tools, 136

J JBoss (Red Hat), enterprise applications, 136

Job criteria, candidate selection, 93–94

Job Description (JD), see Position Description (PD)

Job fairs, PD advertising, 79

Job postings, 294–295, see also Advertising options, PD

Job requirements, performance reviews, 45

Jobs, Steve, 35, 95, 287

Jobster.com, 77

Jokes, e-mail management, 153–154

Junk mail, management, 153–154

K Katzenberg, Jeffrey, 107

Key loggers, 224

Keys, security defenses, 222

Kick-off meeting

goals, 116–117

with non-IT departments, 133

project launch, 116–117

Kluster.com, 289, 298–299

Knowledge base, Help Desk, 279

KOffice, productivity tools, 136

327Index

L L262/2005 (Italy), 228

Labor cost management, 180

LAN, see Local Area Network (LAN)

LANDesk, 143, 280

Language skills

outsourcing agreements, 185

performance reviews, 52

web-based interviews, 92

Laptop devices, consumerization of IT,

272

Lawson, ERP, 157

Layoffs

alternatives, 57b

employee performance, 55–57

Leach, Jim, 231

Leadership

behind-schedule projects, 125

connectivity tool issues, 298–299

vs. management, 13t

tough economic times, 181

Lease vs. buy decision

basic considerations, 168–170

operating vs. capital lease, 169

person deciding, 170

pros and cons, 169, 169t

Legacy applications, VM uses, 140

Legal Department

budget approval, 166

BYO policies, 273

connectivity technologies, 298

consultants vs. employees, 71

control mechanisms, 237

disaster recovery, 248, 250

disciplinary problems, 54, 55

electronic discovery, 242

e-mail archiving, 155

e-mail harassment, 154

evidence maintenance, 238

full-time vs. consultants, 70–71

information/records retention, 242

interview questions, 88

IT manager duties, 2

negative reviews, 50

ongoing security maintenance, 221

outsourcing, 186

“people to know,” 24

policies and procedures, 243

policy documentation, 235

security incident response, 223

software licensing, 145, 147

stakeholder identification, 109

teleworkers, 38

user identification, 264

vendor contracts, 176

Legitimate purpose principle, Data Protection Directive, 234

Letterman, Rob, 107

Liability issues

BYO policies, 273

cloud computing, 151

managing during tough times, 68

vendor contracts, 175

Licensing, see Software licensing

Live Messenger, 91

LinkedIn, 302

Linux, 136, 138

Listening, team management, 33

Live Meeting, 180

Local Area Network (LAN)

carrier connections, 191–192

example schematic, 192f

securing users, 213

technical environment, 191

Locking down, desktop, 143, 144

Log files, 215, 221

Long-term focus, management vs. leadership, 13

Long-term project management, employee performance

reviews, 47

Lotus Notes, client/server software, 136

M Mac OS X, 136, 137

Macro viruses, 224

Madoff, Bernie, 226

Maintenance plans

hardware budget, 172–173

security defenses, 221–222

software licensing, 147

Majority wins, decision-making techniques, 122

Malware

computer security, 208

prevention, 221

types, 224

Management basics

babysitting vs. managing, 7

behind-schedule projects, 125

choosing style, 5

collaboration style, 4

command and control style, 4

job pros/cons, 5t

management vs. leadership, 13t

management styles, 3–5

manager definition, 3

managing in four directions, 7–8, 8f

328 Index

non-tangible aspects, 6

overview, 3–8

politics, 7

resentment toward management, 7

Management buy-in, security management, 212

Manufacturing Department

disaster recovery committee, 250

ERP software, 157

“people to know,” 24

proactive user solutions, 269

Mark Cuban Twitters, 301

Market conditions, benefits of Web, 293

Marketing Department, see Sales and Marketing Department

Marketing material, intranet uses, 294–295

Mashups, as connectedness technology, 289

Massachusetts Data Protection Law, 230–231

Meetings, see also Project meetings

first 100 days, 24–25

information collection, 268

key meeting determination, 19

one-on-one meetings, 15–16

team management, 33–34

webcast, 269

Mergers and acquisitions

dealing with, 27–28

security issues, 205

Metrics

employee performance reviews, 47–48

Help Desk, 275

sharing with users, 267

user satisfaction surveys, 267

vendor evaluation matrix, 177

Microblogging, as connectedness technology, 289

Microsoft cloud computing, 148

Microsoft EULA, 144b

Microsoft Office

end-user upgrades, 269

OS selection, 138

productivity tools, 136

support outsourcing, 184

user-downloadable software, 143

Microsoft Project, 117–118, 117b, 143

Middleware, as software type, 136

Milestone, 119–120

Millenials, see Generation Y (“Millenials”)

Minutes, project meetings, 128–129

Miscellaneous, budget items, 163

Mission statement, 34–35, 267

Mitnick, Kevin, 225

M&M security model, 215

Mobile device management (MDM), 298

Mobile devices

connectivity uses, 295–296

mis-configuration/mal-configured, 211

operating systems, 296–297

uses, 297–298

widgets, 289

Mobile equipment, technical environment, 193

Mobile workforce, see also Remote workers; Telework

programs

support techniques, 274–275

user issues, 274–275

Money, see also Budgeting issues; Cost considerations

capital vs. operating expenses, 115

consultants, 114

hidden costs, 114

internal resource costs, 115

multiple project management, 133

one-time costs, 114

ongoing costs, 114

as project component, 111, 111f, 114–115

Money management

budgeting factors, 170–173

budgeting process, 161–167

capital expenditures vs. operating expense, 167–168

lease vs. buy, 168–170

offshoring, 182–187

outsourcing, 182–187

tough economic times, 179–181

vendors, 173–179

Monitoring programs, 215–216

Monster.com, 77, 79

Morale, employee training, 40

MSN, 225

Multigenerational workforce, advantages, 59–62

Multiple bids, vendor management, 175

Multiple project management

basic considerations, 132–133

politics, 133

time/money prioritization, 133

Multiple Tier Licensing, 146

Multiple Use Licensing, 146

Multitasking, connectivity issues, 290t

MySQL, DBMS, 135

N National Association of Securities Dealers (NASD),

Rule 3010, 232

Network Access Control (NAC), 222

Networking

cloud computing, 151

effectiveness, 78–79

job postings, 77–79

outsourcing, 184

329Index

Network mapping tools, 216

“Newbie” workers, vs. experienced, 61t

New job basics

boss/peer relationships, 17–18

breaking the ice, 15

first day, 14

first-day war stories, 19b

key meetings, 19

key users/applications, 18–20

meeting staff, 14–15

one-on-one meetings, 15–16

overview, 14–20

problem fixing timetables, 19–20

staff who wanted job, 16–17

things not to do, 15

New technologies

BYO policies, 288–289

connectedness, 289–290

handling new technologies, 287–288

New York Stock Exchange (NYSE)

Rule 342, 232

Rule 440, 232

Non-compliance victims, 227

Non-Perpetual Licensing (Subscription licenses, Annual

licenses, Renewal licenses), 131, 146

Nontechnical training, employees, 42

NYSE, see New York Stock Exchange (NYSE)

O Object class, directory structure, 157

Objectiveness, employee performance reviews, 48

Object-Oriented Programming (OOP), 89–90

Objects, directory structure, 156

OCTAVE, see Operationally Critical Threat, Asset, and

Vulnerability Evaluation (OCTAVE)

OFAC, see Office of Foreign Assets Control (OFAC)

Office 365, 138

Office of the Comptroller of the Currency, 229

Office of Foreign Assets Control (OFAC), 233

Office of Thrift Supervision, 229

Off-shore outsourcing

basic considerations, 182–187

definitions, 182t

overview, 182–183

political considerations, 186

pros and cons, 183t

Off-site data storage, disaster recovery plan, 256

Off-track projects

basic considerations, 123–126

behind schedule, 124–125

cost issues, 125–126

issues beyond control, 124

OLAP, see Online Analytical Processing (OLAP)

OLTP, see Online Transaction Processing (OLTP)

On-demand computing, 149

One-on-one meetings

conversation topics, 16

new job basics, 15–16

Online Analytical Processing (OLAP), 135

Online meeting services, project meetings, 130

Online Transaction Processing (OLTP), 135

OOP, see Object-Oriented Programming (OOP)

OpenID, 219

OpenOffice, productivity tools, 136

Open Source Software (OSS)

cost issues, 142

definition, 141

Linux, 138

overview, 141–142

productivity tools, 136

pros and cons, 141t

“Operate in the cloud,” see Cloud computing

Operating expense

vs. capital expense, 115, 167–168

company policies, 168

gray areas, 168

vendor evaluation matrix, 177–178

Operating lease, 169

Operating systems

applications in environment, 138–139

customer needs, 139

emulators, 139

IT issues, 201

Linux, 138

Mac OS X, 137

mobile devices, 296–297

mobile user support, 274

multiple OS environment, 139–140

overview, 137–140

selection, 138–139

as software type, 136

Unix variants, 138

VDI, 140

VMs, 139

VM uses, 140

Windows, 137

Operationally Critical Threat, Asset, and Vulnerability

Evaluation (OCTAVE), 211

Operations tasks, cloud computing, 151

Oracle

cloud computing, 148

DBMS, 135

enterprise applications, 136

ERP, 157

330 Index

Oracle Financials, software types, 136

Orange Book (DoD), 215

Organizational impact, cloud computing, 151

Organization unit, directory structure, 156

OSS, see Open Source Software (OSS)

“Out of scope,” project objectives, 107

Outside services, budget items, 163

Outsourcing

agreement evaluation, 184–186

basic considerations, 182–187

compliance, 244

definitions, 182t

determing factors, 184–187

functions, 184

hiring justification, 68

overview, 182–183

political considerations, 186

pros and cons, 183t

Overhead, budget items, 163

Overqualified candidates, 85–86

Oxley, Michael G., 227

P PaaS, see Platform as a Service (PaaS)

Page, Larry, 95, 209

Page hijacker, 224

Passwords

authentication methods, 220

backup tapes, 256

BYO policies, 289

challenge–response authentication, 219

compliance, 243

consumerization of IT, 273

directory services, 156

disaster recovery, 258

Help Desk activities, 276–277, 281

identity management, 220

malware, 224

mobile devices, 298

NAC, 222

phishing, 225

risk mitigation, 212

secure users, 213

security incident response, 223

security vs. privacy vs. convenience, 207

security technologies, 217–218

self-service help, 277

SLAs, 283

special privilege IDs, 218

SSO, 219

two-factor authentication, 219

user training, 213

Patriot Act, 232

Pattern files updates, 222

PayPal, 225

Payroll Department

cloud computing, 148–149

disaster recovery, 261

security authorization levels, 218–219

Payroll information, intranet uses, 294–295

PC Anywhere, 279–280

PD, see Position Description (PD)

PDCA, see Plan, Do, Check, Act (PDCA)

Performance measurement, IT governance, 239

Performance reviews

360 reviews, 51, 51t

accountability, 46

basic considerations, 43–44

communication skills, 45

compliance, 46

conduction discussion, 52

creative problem solving, 45

employee flexibility, 45

ethics, 46

evaluation statements, 47–48, 48t

example, 50b

guidelines, 48–49

innovation, 45

job requirements, 45

learning new skills, 46–47

metrics, 47–48

negative reviews, 49–50

objectiveness, 48

plan/goals development, 52–53

“plays well with others,” 46

privacy issues, 52

quality of work, 44

recording details, 48–49

self-reviews, 50

short-/long-term project management, 47

team players, 47

timely performance, 46

tone, 52

Perks, project management techniques, 127

Per seat licensing, 146

Per server licensing, 146

Personal contacts, job postings, 78

Personal Information Protection and Electronic Documents

Act (PIPEDA), 233

Personality tests, 90b

Personally identifiable information (PII), 226–227,

230, 232

Personally-owned equipment, BYO policies, 288–289

Personnel, budget items, 162

331Index

PERT charts, see Program Evaluation and Review

Technique (PERT) charts

PGP, see Pretty Good Privacy (PGP)

Phased integration, dealing with mergers, 28

PHI, see Protected Health Information (PHI)

Phishing, 153–154, 208, 225–226

Phone tree, DR communication plan, 254

Physical access, activity tracking, 216

Physical plant items

budget process, 163

as capital expense, 167

PII, see Personally identifiable information (PII)

PIPEDA, see Personal Information Protection and

Electronic Documents Act (PIPEDA)

PKI, see Public Key Infrastructure (PKI)

Plan, Do, Check, Act (PDCA), 241

Platform as a Service (PaaS), 149, 151

PlayStation Network, 225

“Plays well with others,” performance reviews, 46

Plurk.com, as connectedness technology, 289

PMBOK, see Project Management Book of Knowledge

(PMBOK)

PMI, see Project Management Institute (PMI)

PMO, see Project Management Office (PMO)

PMP, see Project Management Professional (PMP)

Podcasting, 289, 290

Policies, see also Bring Your Own (BYO) Policy;

Compliance; Procedures

compliance, 243

consumerization support issues, 272

e-mail usage, 153, 154

expense items, 168

Help Desk training, 282

securing users, 214

T&M contracts, 172–173

Policy manuals, intranet uses, 294–295

Politics

connectivity technologies, 302

management basics, 7

multiple project management, 133

outsourcing, 186

Position Description (PD)

advertising options, 77–79

common hiring mistakes, 99

vs. contracts, 75

example, 76f

general requirements, 75–77

overview, 74–79

Pretexting, GLB, 231

Pretty Good Privacy (PGP), 222

Price adjustments, benefits of Web, 293

PricewaterhouseCoopers, 158

Print advertising, PDs, 79

Printer alerts, 268

Priorities, focused employees, 32

Priority Zero, 251

Privacy and Electronic Communications Directive

(European Union), 234

Privacy issues

electronic discovery, 242

outsourcing, 244

performance reviews, 52

securing users, 214

vs. security vs. convenience, 207

Privacy Rule, HIPAA, 229

Private vs. public cloud, 149–150

Proactive solutions

employee training, 41

user relationships, 268–269

Problem-solving skills

behind-schedule projects, 125

employee performance reviews, 45

Procedures, see also Policies

compliance, 243

Help Desk

basic considerations, 276–277

escalating calls, 276–277

staff training, 282

Procurement Group, project stakeholders, 108

Product information

benefits of Web, 294

vendor evaluation matrix, 179

Productivity tools

cloud computing, 148

Microsoft Project, 117

software types, 135, 136

Product placement, benefits of Web, 293

Professional contacts, job postings, 78

Professional courtesy

consultant pros and cons, 72t

e-mail user principles, 153

outsourcing agreements, 185

Professionalism

advertising personal offerings, 21

candidate selection, 87, 88, 92, 98

employee performance, 46, 47

generational issues, 58

meeting staff, 14

negative performance reviews, 50

one-to-one meetings, 16

outsourcing agreements, 185

towards staff who wanted job, 17

Professional references, candidate selection, 97–98

Profile tests, 90b

332 Index

Program Evaluation and Review Technique (PERT)

charts, 118–119, 120f

Project charter, 110, 121–122

Project frameworks, 127

Project management

certified project manager, 105

closeout report, 121–122

cost management, 180

decision-making techniques, 122–123

employee performance reviews, 47

formalized frameworks, 127

funding

budget source, 131

cost estimation, 130–131

cost justification, 132

overview, 130–132

total cost, 131

key phases, 104–105

“laws,” 124b

multiple projects

basic considerations, 132–133

politics, 133

time/money prioritization, 133

non-IT participation

basic considerations, 133–134

employee motivation, 133

person in charge, 133–134

off-track projects

basic considerations, 123–126

behind schedule, 124–125

cost issues, 125–126

issues beyond control, 124

overview, 103

PMI, 105–106, 105b

PMO, 106

progress tracking

basic considerations, 117–121

critical paths, 118–119

Gantt Charts, 118, 119f

management/team updates, 120–121

Microsoft Project, 117–118

milestones, 119–120

PERT charts, 118–119, 120f

red/yellow/green indicators, 121

summary updates, 121

time lines, 118

tools, 118

project launch

kick-off meeting, 116–117

options, 116

project plan

closeout report as guide, 112

critical components, 111, 111f

money, 114–115

multiple projects, 115–116

resources required, 113–114

roles and responsibilities, 115

time estimates, 112–113

project teams, 126

project types, 104

scope

basic considerations, 106–111

constraints, interdependencies, risks, 109–110

defined objectives, 106–107

department vs. company objectives, 107

historical perspective, 110–111

project charter, 110

sponsorship, 107–108

stakeholders, 108–109

value, 104

Project Management Book of Knowledge (PMBOK), 104–105

Project Management Institute (PMI), 105–106, 105b, 107

Project Management Office (PMO), 106

Project Management Professional (PMP), 41, 105

Project management techniques

basic considerations, 126–130

“Flying Pig” award, 127b

manager participation, 127

meeting agendas, 128

meeting costs, 129

meeting minutes, 128–129

perk offerings, 127

productive meetings, 128–130

project code name, 127

war room, 126–127

Project Manager (PM)

certified, 105

decision-making techniques, 123

PMI, 105

project cost estimation, 130–131

Project meetings

agendas, 128

basic considerations, 128–130

hidden costs, 129

minutes, 128–129

non-IT participation, 133

options, 129–130

team management, 34

useful techniques, 130

Project milestone, 119–120

Project objectives

clear definition, 106–107

department vs. company, 107

mid-project change, 107b

333Index

Project plan

closeout report as guide, 112

critical components, 111, 111f

money, 114–115

multiple projects, 115–116

resources required, 113–114

roles and responsibilities, 115

time estimates, 112–113

Project reviews, post-implementation, 268

Project sponsor, 107–108, 110

Project stakeholder

behind-schedule projects, 124

cost overruns, 125

identification, 108–109

information sharing, 266

IT governance, 238

leadership vs. management, 13t

meeting costs, 129

off-track projects, 123

project charter, 110

sponsorship, 108

summary updates, 121

Project teams

candidates, 126

project management, 126

Proportionality principle, Data Protection Directive, 234

Protected Health Information (PHI), 229

Public cloud, vs. private, 149–150

Public Company Accounting Reform and Investor Protection

Act (2002), see Sarbanes–Oxley (SOX)

Public Key Infrastructure (PKI), 222

Q Qualitative risk analysis, security management, 210

Quality of work

employee performance review, 44

outsourcing agreements, 185

Quantitative risk analysis, security management, 210

Qwest Communications, 226

R Rackspace, 148

Radio Frequency Identification (RFID), 207

Real estate, disaster recovery, 254–256

Records retention, compliance, 242

Recovery Point Objective (RPO), 249, 249f

Recovery Time Objective (RTO), 249, 249f

Recruiters

basic considerations, 79–82

current usefulness, 81b

multiple recruiters, 82

pros and cons, 80t

selection, 81–82

technical abilities, 82

Recruiting fairs, PD advertising, 79

Red indicators, project progress tracking, 121

Reference checks

candidate selection, 97–98

common hiring mistakes, 99

Referrals, as hiring starting point, 68

Regional disaster, DR plan, 259

Relationship issues

with boss/peers, 17–18

first 100 days, 24

vendor management, 173–174

Remote control

Help Desk, 279–280

mobile user support, 274

Remote Control (Dameware), 279–280

Remote interviews, candidate selection, 91–92

Remote workers, 37–38, 37b, see also Mobile workforce;

Telework programs

Renewal licensing, 146

Request for Information (RFI), 174

Request for Proposal (RFP), 174, 175

Request for Quotation (RFQ), 174

Resource management, 239

Resources, as project component, 111, 111f, 113–114

Résumé reviews, candidate selection, 83–84

Return on Investment (ROI)

cloud computing, 151

consumerization of IT, 271

PMO, 106

project cost justification, 132

VDI, 140

RFI, see Request for Information (RFI)

RFID, see Radio Frequency Identification (RFID)

RFP, see Request for Proposal (RFP)

RFQ, see Request for Quotation (RFQ)

Risk analysis

security management, 210

tool options, 211

Risk management

BYO policies, 273

IT governance, 239

project management, 109–110

security management, 210, 211

T&M contracts, 172

Risk mitigation, security management, 212–213

ROI, see Return on Investment (ROI)

Rootkits, 224

RPO, see Recovery Point Objective (RPO)

RSS feeds, as connectedness technology, 289

Rule 17a-3, Securities and Exchange Act (1934), 232

334 Index

Rule 17a-4, Securities and Exchange Act (1934), 232

Rule 342, NYSE, 232

Rule 440, NYSE, 232

Rule 3010, NASD, 232

Rule of Least Privilege, 215

S SaaS, see Software as a Service (SaaS)

Safeguards Rule, GLB, 231

Salary range

candidate selection, 99–101

making offer, 99

non-monetary compensation, 100–101

sharing with agencies, 99–100

Salary review, employee performance, 53–54

Salesforce.com, 148

Sales incentives, benefits of Web, 293

Sales and Marketing Department

candidate selection, 96

capital vs. operating expenses, 167

customer identification, 12

IT for business value, 181

IT manager duties, 1, 2

“people to know,” 24

user identification, 264

SAP

enterprise applications, 136

ERP, 157

OS selection, 138

Sarbanes, Paul S., 227

Sarbanes–Oxley (SOX), 46, 155, 226, 227–228, 233

SB-1386, 230

Scalability, vendor evaluation matrix, 178

SCAMPI, see Standard CMMI Appraisal Method for

Process Improvement (SCAMPI)

SCCM, 143, 279–280

Scheduling demands

employee training, 40

kick-off meeting, 116

off-track projects, 124–125

progress tracking, 117

Schmidt, Eric, 290t

Scope Creep

call tracking software, 278

Project Charter, 110

project management, 106–107

Scope determination

disaster recovery

application assessment, 250–252, 251f, 252f

basic considerations, 248–252

data value, 252

key questions, 248–249

RPO, 249, 249f

RTO, 249, 249f

project management

basic considerations, 106–111

constraints, interdependencies, risks, 109–110

defined objectives, 106–107

department vs. company objectives, 107

historical perspective, 110–111

project charter, 110

sponsorship, 107–108

stakeholders, 108–109

technical environment, 190

Scrums, Agile Meetings, 34

Secure Sockets Layer (SSL), 222

Securities and Exchange Act (1934)

Rule 17a-3, 232

Rule 17a-4, 232

Security audit, basic considerations, 209–210

Security Breach Information Act (SB-1386), 230

Security defenses

common solutions, 220–223

encryption, keys, certificates, 222

firewalls, 220

IDS/IPS, 220–221

incident response, 223–224

malware prevention, 221

network access control, 222

ongoing maintenance, 221–222

staffing issues, 223

Security Incident Response Team (SIRT), 223

Security issues

assessing intentions, 208

basic considerations, 205

breach examples, 225b

CIA, 208

common themes, 207–209

connectivity impact, 206–209

consumerization of IT, 273

importance of close examination, 208–209

perspective, 206

security vs. privacy vs. convenience, 207

threat types, 224–226

Security management

basic actions, 209–214

care when web surfing, 214

common weaknesses, 210b

employee impact, 214

needs, exposures, defenses, 209–212

risk analysis, 210–211

risk analysis tools, 211

risk management, 210, 211

securing users, 213–214

335Index

Security management (Continued)

security audits, 209–210

security as ongoing process, 214

upper-level management buy-in, 212

user training, 213

white hats, 211–212

Security software, characteristics, 136

Security solutions

authentication, 219–220

authentication methods, 220

authorization levels, 218–219

challenge–response authentication, 219

identity management, 220

single sign-on, 219–220

two-factor authentication, 219

Security technologies

access reviews, 218

account usage, 216

control access, 215

passwords, 217–218

special privilege IDs, 218

tracking activity, 214–219

Self-reviews, employee performance, 50

Self-service identity management, 220

Servers

client/server software type, 136

first 100 days, 23

per server licensing, 146

technical environment, 192

Service Level Agreement (SLA)

basic considerations, 283–284

first 100 days, 23

good SLAs, 284

outsourcing agreements, 185

positive values, 283

staff help, 283–284

vendor contracts, 176

Service providers, project planning, 113–114

Service requests

authorization levels, 218–219

intranet uses, 294–295

vendor evaluation matrix, 179

Shipping and Receiving, project stakeholders, 108

Short-term focus, management vs. leadership, 13

Short-term project management, employee performance

reviews, 47

Single Sign-On (SSO), 156, 219–220

SIRT, see Security Incident Response Team (SIRT)

Six Sigma, 241–242

Skill building

employee performance reviews, 46–47

performance reviews, 52–53

Skill inflation, self-review of performance, 50

Skill set, candidate selection, 92

Skype, 180

SLA, see Service Level Agreement (SLA)

Slack time, 119

SMART, performance reviews, 53

Smart phones

empowered users, 292

iPhone, see iPhone

securing users, 214

Social engineering

computer security, 209

Help Desk staff training, 282

as threat type, 225–226

Social media

connectivity uses, 295–296

tool implementation, 299–300

usage guidelines, 300

virtually private tools, 298–299

Social networking

as connectedness technology, 289

connectivity issues, 290t

team management, 33

tool implementation, 299–300

Soft costs, project funding, 130

Soft sciences-related degrees, candidate selection, 97

Software

budget items, 162–163

call tracking, 278–279

cloud computing, see Cloud computing

consumerization of IT, 272

end-user upgrades, 269

enterprise applications, see Enterprise applications

ERP, see Enterprise Resource Planning (ERP)

IT issues, 201

job requirement flexibility, 94

maintenance budget, 171

mobile user support, 274

operating systems, see Operating systems

OSS, 141–142, 141t

project costs, 131

technical environment, 193–194

tracking tools, 194–195

types, 135–136

Software as a Service (SaaS), 149, 151

Software and Information Industry Association, 145

Software licensing

basic issues, 145–148

cloud computing, 151

consolidation on purchases, 147–148

GNU free software, 144b

maintenance/support plans, 147

336 Index

Microsoft EULA, 144b

models and types, 146

negotiations, 147

types, 144–145

vendor evaluation matrix, 177

Software management

basic considerations, 142–148

deployment, 142–143

deployment tools, 143

desktop lockdown, 144

disk cloning, 143

e-mail, 153–155

standard disk image, 143

TCO, 142

techniques, 142–144

user-downloadable software, 143

Software patches, ongoing maintenance, 222

Software updates

deployment tools, 143

ongoing maintenance, 222

SOX, see Sarbanes–Oxley (SOX)

Spam, 153–154, 208

Special privilege IDs, security technologies, 218

Spoofing, 208, 225

Spyware, 208

SQL Server, DBMS, 135

SSA Global, ERP, 157

SSCP, see Systems Security Certified

Practitioner (SSCP)

SSO, see Single Sign-On (SSO)

Staffing issues, see also Hiring

behind-schedule projects, 125

budgeting factors, 171

cost management, 180

encouraging questions, 33

Help Desk

overview, 281–282

specific considerations, 281–282

staff size, 282

training, 282

security defenses, 223

SLA help, 283–284

Standard CMMI Appraisal Method for Process Improvement

(SCAMPI), 240

Standardization, 151, 201, 240–241

Standards, technical environment

basic considerations, 199–201

IT issues, 200–201

IT standards, 201

user issues, 199–200

Stand-ups, 34

Stoll, Clifford, 225

Storage

disk/tape encryption, 222

technical environment, 192

Strategic alignment, IT governance, 239

Subcommittees, decision-making techniques, 123

Subscription licenses, 146

Summary updates, project progress tracking, 121

Supply requests

budget items, 163

intranet uses, 294–295

Support Center, see Help Desk

Support issues

consumerization and handheld devices, 272–273

depth and breadth, 273

vs. maintenance issues, 171

mobile users, 274–275

vendor contracts, 176

vendor evaluation matrix, 179

Support plans, software licensing, 147

Surowiecki, James, 293

Surveymonkey.com, 280

System log files, tracking activity, 215

Systems Security Certified Practitioner (SSCP), 223

T TCO, see Total Cost of Ownership (TCO)

Team management

Agile Meetings, 34

avoiding/monitoring burnout, 36–37

communication, 32–34

company values, 34–35

decision-making techniques, 123

employee burnout, 36

employee performance

disciplinary problems, 54–57

layoff alternatives, 57b

layoffs, 55–57

salary review, 53–54

terminations, 54–57

employee training

basic considerations, 39–43

certification, 41

cost, 39

departures after, 41–42

identifying employees, 40–41

maximizing value, 42–43

morale, 40

needs, 39–40

nontechnical training, 42

scheduling demands, 40

focused employees, 32–38

generational issues

337Index

Team management (Continued)

basic considerations, 57–62

cross-generation management, 58–62

differences, 58t, 60t

experienced vs. “newbie” workers, 61t

multigenerational workforce advantages, 59–62

goal achievement, 32–33

goals and objectives, 32

listening importance, 33

meeting frequency, 33–34

mission statement, 34–35

overview, 31

performance reviews

360 reviews, 51, 51t

accountability, 46

communication skills, 45

compliance, 46

conduction discussion, 52

creative problem solving, 45

ethics, 46

evaluation areas, 44–47

evaluation statements, 47–48, 48t

flexibilty, 45

guidelines, 48–49

innovation, 45

job requirements, 45

learning new skills, 46–47

metrics, 47–48

negative reviews, 49–50, 50b

objectiveness, 48

overview, 43–57

performance reviews, 43–44

plan/goals development, 52–53

“plays well with others,” 46

privacy issues, 52

quality of work, 44

recording details, 48–49

self-reviews, 50

short-/long-term project management, 47

team players, 47

timely performance, 46

tone, 52

priorities, 32, 35

project meetings, 34

project progress updates, 120–121

remote workers, 37–38

staff input, 33

telework types, 37b

vision statement, 34–35

Team players, employee performance reviews, 47

TeamViewer, 279–280

Technical courses, candidate selection, 97

Technical environment

application inventory, 193–194

asset management, 196–199

basic considerations, 189

carrier connections, 191–192

definition, 189–190

disaster recovery, hardware availability, 257

elements, 190–194

infrastructure documentation, 195–196

LAN, 191, 192f

mobile equipment, 193

OS selection, 138–139

problem/risk areas, 196

scope, 190

security management, 209–212

server/storage, 192

software inventory, 193–194

standards determination

basic considerations, 199–201

IT issues, 200–201

IT standards, 201

user issues, 199–200

TCO, 196–199

TCO calculation, 197–198

team management, 31

technology refresh cycles, 201–202

tracking tools, 194–195

user environment, 196

vendors, 194

WAN, 190, 191f

workstations, 193

Technical interviews

basic considerations, 89–93

preliminary reading, 89

technology explanation request, 89–90

testing candidates, 90–91

Technical Operations, IT Department value, 9

Technical standards, flexibility, 270

“Technology envy,” 199–200, 270

Technology refresh cycles, 171, 201–202

Technology value, IT strategy development, 11–12

Telecommunication services, budget items, 163

Telephone screening, candidate selection, 84

Telephone skills, Help Desk staffing, 281

Telework programs, see also Mobile workforce; Remote

workers

remote interviews, 91

team management, 37–38

types, 37b

Terminations, employee performance, 54–57

Term of agreement, cloud computing, 151

Terms and Conditions (“Ts and Cs”), 176

338 Index

Testing

disaster recovery plan, 258

technical interviews, 90–91

Test-taking skills, candidate selection, 94–95

T&E submissions

directory structure, 157

intranet uses, 294–295

IT for business value, 180–181

Text messages

as connectedness technology, 289

mobile user support, 274

TheLadders.com, 77

Third-party training providers, user training,

270–271

Threat types

basic considerations, 224–226

malware, 224

phishing, 225–226

security breach examples, 225b

social engineering, 225–226

Time-and-Material (T&M) contracts

hardware maintenance, 172–173

overview, 172–173

risks, 172

vendor policies, 172–173

Time estimates

multiple project management, 133

as project component, 111, 111f, 112–113

Time lines, project progress tracking, 118

Timely performance, employee reviews, 46

Time sheets, intranet uses, 294–295

Timing considerations, full-time vs. consultants, 71–74

T&M, see Time-and-Material

(T&M) contracts

Toll-free numbers, mobile workers, 269

Tone, performance reviews, 52

Torvalds, Linus, 138, 141

Total Cost of Ownership (TCO)

software management, 142

technical environment

vs. asset management, 198–199

basic considerations, 189, 197–198

calculation, 197–198

definition, 196–199

vendor evaluation matrix, 177–178

Tough economic times

basic considerations, 179–181

cost management, 179–180

IT for business value, 180–181

leadership, 181

management ideas, 68b

recruiters, 82

Tracking activities

monitoring programs, 215–216

network mapping tools, 216

physical access, 216

security technologies, 214–219

system log files, 215

technical environment, 194–195

Traditionalists, generation differences, 58t

Training, see also Employee training

Help Desk staff, 282

in-house classes, 270

intranet uses, 294–295

job requirement flexibility, 93

position description, 76

third-party training providers, 270–271

user education and awareness, 271

users, 270–271

user security, 213

vendor evaluation matrix components, 178

web-based, 271

Transaction logs, DR data replication, 256

Transparency principle, Data Protection Directive, 234

Travel and Entertainment, budget items, 163

Trial evaluations, vendor management, 175

Trojan horse, 208, 224

Troubleshooting skills, Help Desk staffing, 281–282

Trouble tickets, 218–219, 278

“Ts and Cs,” see Terms and Conditions (“Ts and Cs”)

Turnover rates, staff budgeting factor, 171

24/7/365 exposure, benefits of Web, 293

Twitter.com, 44, 289, 298–299, 301, 302

Two-factor authentication, 219

Tyco, 226

U Unified messaging, 155–156

Uniting and Strengthening America by Providing Appropriate

Tools Required to Intercept and Obstruct Terrorism Act

(2001), see Patriot Act

Unix, 136, 138

Upper-level management

buy-in to security program, 212

project management updates, 120–121

USB (Universal Serial Bus)

data encryption, 222

disaster recovery communication plan, 254

Massachusetts Data Protection Law, 231

mobile user support, 274

User environment

new job basics, 18–20

standards determination, 199–200

understanding, 196

339Index

User issues

basic considerations, 263–271

boss’s view of users, 265

BYO policies, 273

consumerization of IT, 271–273

consumerization support issues, 272–273

department’s view of users, 264

e-mail usage education, 153

flexibility, 270

handheld device support issues, 272–273

handling consumerization, 272

Help Desk

access, 277

activities, 276

overview, 275–282

procedures, 276–277

self-service, 277–278

staffing, 281–282

tools, 278–280

user surveys, 280

workload measurement, 281

information collection, 267–268

information sharing, 266–267

IT Manager availability/reachability, 266

meeting users, 265–266

mobile work force, 274–275

proactive solutions, 268–269

securing users, 213–214

security training, 213

SLAs, 283–284

user training, 270–271

user types, 264

User satisfaction surveys, 267, 280

User Services, see Help Desk

User terminations, security technologies, 217

U.S. securities, 232

Utility computing, see On-demand computing

Utility tools

database integrity check, 27

software types, 136

TCO, 142

V Value delivery, IT governance, 239

VDI, see Virtual Desktop Infrastructure (VDI)

Vendor management

alternatives evaluation, 176

basic considerations, 173–179

contract review, 175–176

evaluation matrix, 177–179

multiple bids, 175

relationships, 173–174

request for proposals, 174

trial evaluations, 175

from vendor POV, 174

Vendors

certification value, 94

cloud computing, 150t, 151

data replication, 256

feedback during tough economy, 181

Help Desk staff training, 282

information sharing with users, 267

project costs, 131

project planning, 113–114

project stakeholders, 109

software licensing plans, 147

technical environment, 194

technology refresh cycles, 202

T&M policies, 172–173

Vernon, Conrad, 107

Veterans, generational differences, 60t

Videoconferencing tools

connectivity issues, 290t

IT for business value, 180

project meetings, 129

remote interviews, 91

staff expenses, 180

team management, 33

Video sharing

as connectedness technology, 289

connectivity tool issues, 298–299

Virtual Desktop Infrastructure (VDI), 140

Virtual Local Area Network (VLAN),

149–150

Virtual Machine (VM)

licensing models/types, 146

multiple OSes, 139

OS selection, 139

technical environment, 192

uses, 140

Virtual Private Cloud (VPC), 149–150

Virtual Private Network (VPN)

data encryption, 222

NAC, 222

network access control, 222

security software, 136

security solutions, 222

telework programs, 38

WAN, 190, 191f

Viruses

computer security, 208

e-mail management, 154

macro viruses, 224

proactive detection, 268

340 Index

Vision statement, team management, 34–35

VLAN, see Virtual Local Area Network (VLAN)

VM, see Virtual Machine (VM)

Voice over IP (VOIP), 156, 180, 191

VPC, see Virtual Private Cloud (VPC)

VPN, see Virtual Private Network (VPN)

W W-2s, 70

WAN, see Wide Area Network (WAN)

Warranties, hardware maintenance, 173

War room, 126–127

The War Room, 126–127

Web 2.0, 298

Web-based training, 271

Web-cams, 33, 180

Webcasts, 269

Web-conferencing, 33, 180, 269

WebEx, 91, 180, 290t

Web sites

benefits for companies, 293–294

care when surfing, 214

DR communication plan, 254

PD advertising, 77

spoofing, 225

WebSphere (IBM), 136

White hats, 208, 211–212

White list, 154

Wide Area Network (WAN)

carrier connections, 191–192

DR testing, 258

example schematic, 191f

technical environment, 190

Widgets, as connectedness technology, 289

Windows operating system

firewalls, 220

OS selection, 138

as software type, 136

versions, 137

Windows Phone (Microsoft), 296

Wisdom of crowds, connectivity issues, 293

The Wisdom of Crowds (Surowiecki), 293

WISP, see Written information security program (WISP)

WordPerfect Office (Corel), productivity tools, 136

Work-from-home staff, see Telework programs

Work/life balance, connectivity benefits, 296

Workload issues, Help Desk, 281

Workstations

consumerization of IT, 271

IT standards, 201

remote control, 279–280

technical environment, 193

WorldCom, 226

Worm, 221, 224

Written information security program (WISP), 230–231

Y Yahoo, 91, 225

Yammer.com, 289, 298–299

Yellow indicators, project progress tracking, 121

YouTube, 289, 298–299, 302

Z Zero Day Attack, 224

Zoomerang.com, 280

Zuckerberg, Mark, 4, 95

341Index

  • Front Cover
  • IT Manager’s Handbook:Getting your new job done
  • Copyright
  • Dedication
  • About the Authors
  • Brief Table of Contents
  • Contents
  • Key Changes for This Edition
    • Major Change: Principles and Core Concepts
    • Another Major Change: Connectivity
  • Preface
    • The Structure of This Book
    • Chapter-by-Chapter Summaries
    • Note on URLs and Web Resources
  • Acknowledgments
  • Chapter 1: The Role of an IT Manager
    • 1.1 Just What Does an IT Manager Do?
      • Why All That Change and Flexibility Is Good
      • Why All That Change and Flexibility Is Bad
    • 1.2 Managers in General
      • Definition of a Manager
      • Styles of Management
        • Command and Control
        • Collaboration
        • What Kind of Manager Will You Be?
      • Pros and Cons of Being a Manager: Reasons to Become a Manager, and Reasons Not to Become One
      • The Hidden Work of Management
        • Management Is Sometimes Hard to See
        • Good and Bad Management Often Look Alike-For a While
      • Resentment toward Management
      • Babysitting versus Managing
      • Politics
      • Managing in Four Directions
    • 1.3 The Strategic Value of the IT Department
      • Application Development versus Technical Operations
        • Application Development
        • Technical Operations
      • IT Department Goals
      • The Value of IT Managers
    • 1.4 Developing an IT Strategy
      • Determine Who Your Team Members Are
      • Determine How Important Technology Is to Your Organization
      • Determine Who Your Customers Are and What Their Needs Are
      • Keep Your Department Central to the Company's Operations
    • 1.5 Leadership versus Management
    • 1.6 Starting Your New Job
      • The First Day
      • Meeting the Staff
      • A Few Ideas for What to Say to Break the Ice
      • Some Don'ts
      • One-on-One Meetings
        • Some Topics to Get the Conversational Ball Rolling
      • What to Say to Those Who Wanted Your Job and Didn't Get It
      • Establish a Relationship with Your Manager and Your Peers
      • Learning the Landscape: Key Users and Key Applications
        • Find the Key Meetings
        • Be Realistic about Timetables for Fixing Problems
    • 1.7 The First 100 Days
      • No Organization Is Perfect
      • Quietly Advertising What You Bring to the Table
        • Do Some Preliminary Research before You Start
        • Bring a Fresh Perspective
        • Ask and Listen
      • Projects in Progress and Projects on the Horizon
      • Is the Status Quo Good Enough?
      • People to Meet and Know
      • Quick Introductory Meetings
      • Human Resource Issues
        • Soon, Later, and Tomorrow: When Should You Address Issues
        • Regardless of What Happens, Let Them Know You've Heard Them
      • Budgeting
      • Making Those First Decisions
    • 1.8 Two IT Departments-What Happens If Your Company Merges with Another?
    • 1.9 Further References
  • Chapter 2: Managing Your IT Team
    • 2.1 Keeping Employees Focused
      • Establish Priorities
      • Communicate with Your Team
        • Make Sure the Team Understands the Overall Objective and Goals
        • Explain How You Envision Achieving the Goal
        • Encourage Questions and Input from Your Staff
        • Listen Carefully
        • Meet Regularly
        • Agile Meetings
        • Project Meetings
      • Company Mission, Vision, and Values
      • Be as Clear as Possible about Your Real Priorities
      • Avoid Burnout in Your Employees
      • Make Your Employees Aware of the Dangers of Burnout
        • Outline the Prices Employees Can Pay
      • Deal with the Situation
      • Managing Remote Workers (or Teleworkers)
    • 2.2 Employee Training
      • Cost
      • Need
      • Scheduling Demands
      • Employee Morale
      • How Do You Know When Your Employees Need Training?
      • Certification
      • What If the Employee Takes a Training Class and Then Uses His New-Found Skills to Find Another Job?
        • Be Honest about This Problem
        • Employee Agreements
      • Nontechnical Training
      • Maximizing the Value of Training
    • 2.3 Employee Performance
      • Performance Reviews
        • No Surprises!
      • Key Areas of Evaluation
        • Quality of Work
        • Flexibility
        • Creativity in Solving Problems
        • Communication Skills
        • Innovation
        • Going Above and Beyond Requirements of the Job
        • Coordination, Interaction, and Collaboration with Others (Particularly Those They Don't Have Direct Authority Over)
        • Accountability
        • Ability to Complete Assignments in a Timely Manner
        • Ethics and Compliance
        • Ability to Pick Up New Skills on Their Own
        • Ability to Work with and Enhance the Work of Other Staff Members
        • Ability to Manage Short- and Long-Term Projects
      • Specific Evaluation Statements
        • Useful Metrics
      • Guidelines for Reviews
        • Be Objective
        • Carefully Record Details
      • Negative Reviews
        • Be Specific
        • It Should Not Be a Surprise
        • Keep HR Informed
        • Be Professional
      • Have Employees Review Themselves
      • 360 Reviews
      • How to Conduct the Actual Review Discussion
        • Respect Privacy
        • Tone of the Discussion
      • Development Plans and Goals
      • Salary Review
      • Disciplinary Problems and Terminations
        • Disciplinary Problems
        • Layoffs and Terminations
    • 2.4 Generational Issues at Work
      • Managing across Generations
        • Leveraging a Multigenerational Workforce
    • 2.5 Further References
  • Chapter 3: Staffing Your IT Team
    • 3.1 Why IT Managers Need to Deal with Hiring People
      • Human Resources Department's Role
        • How to Get Help with Your Hiring
      • Justifying a Hire
      • Start with Internal and External Referrals
      • Internal versus External Hires
      • Should You Hire a Full-Time Employee or a Consultant?
        • Determine Which Type Is Best for Your Job
        • Consultant or Employee: You Can't Have It Both Ways
        • Timing Considerations
    • 3.2 Write a Position Description
      • Position Descriptions versus Contracts
      • General Requirements
      • Advertising Options
        • First, Post Internally
        • Popular Websites
        • Web Posting Issue to Think About
        • Networking
          • Professional Contacts
          • Personal Contacts
          • Effectiveness of Networking
        • Job/Recruiting Fairs
        • The (Limited) Value of Print Advertising
    • 3.3 Recruiters
      • Finding the Right Recruiter
        • Technical Abilities
        • Things to Keep in Mind
        • Using Multiple Recruiters
    • 3.4 Selecting Candidates
      • Reviewing Résumés
      • Telephone Screening
      • At What Level Should I Interview?
      • Narrowing Down the List
        • How to Choose from Hundreds of Candidates
        • How to Choose from 30 Qualified Candidates
        • Should You Hire an Overqualified Candidate?
      • General Interview Guidelines
      • Prepare a List of Questions
        • Nontechnical Questions
        • What Not to Ask
      • Who Else Should Interview a Candidate?
      • Key Concepts for a Good Technical Interview
        • Do Some Preliminary Reading
        • Let Them Explain Technologies to You
        • Testing Candidates
        • Interviewing Candidates over the Web
        • The Right Skill Set for the Job
        • When to Accept Similar Experience
      • Rank Criteria
        • Other Requirements That You Might Be Flexible About
        • Ability to Learn
      • The Value of Certification
        • Test-Taking Skills
        • Value of Commitment
        • Checking the Value of a Certification
      • Education
        • Direct Value to the Job
        • Indirect Value to the Job
        • Business-Related Degrees
        • Hard Sciences-Related Degrees
        • Soft Sciences-Related Degrees
        • Technical Courses
      • Checking References
        • Background Checks
        • Professional References
      • Common Hiring Mistakes
      • Offering the Correct Salary for an IT Position
        • Before Making the Offer
        • Using Agencies
        • Other Ideas besides More Money
    • 3.5 Further References
  • Chapter 4: Project Management
    • 4.1 Projects and Project Management: A Quick Overview
      • Different Kinds of Projects
      • The Value of Project Management
      • Five Key Phases to a Project
      • Do You Have to Be a Certified Project Manager to Run a Project?
      • The Project Management Institute (PMI)
      • A Project Management Office
    • 4.2 Phase One: Scope the Project
      • Clearly Define the Project's Objective and Scope to Avoid Scope Creep
      • Department versus Company Objectives
      • Get Proper Sponsorship for the Project
      • Identify the Stakeholders
      • Identify the Constraints, Interdependencies, and Risks
        • Potential Variables
        • Possible Solutions
      • The Project Charter
      • Get Historical Perspective
    • 4.3 Phase Two: Develop a Project Plan
      • Three Critical Components to Any Project
      • Write the Project Plan with the Closeout Report in Mind
      • Time Estimates
      • Resources Required: Employees (Internal and External to IT)
        • Full-Time versus Consultant Employees
        • Vendors and Service Providers
      • Money
        • One-Time Costs
        • Ongoing Costs
        • Hidden Costs
        • Consultants
        • Costs of Internal Resources
        • Capital versus Operating Expense
      • Roles and Responsibilities
      • Multiple Projects
    • 4.4 Phase Three: Launch the Project
      • Range of Launch Options
      • Stage a Kick-Off Meeting
        • Goals of Your Kick-Off Meeting
    • 4.5 Phase Four: Track the Project's Progress
      • Microsoft Project
      • Other Project Management Tools
      • Gantt Charts and Time Lines
      • PERT Charts and Critical Paths
        • Critical Path
      • Project Milestones
      • Updates to Management and the Team
        • Summary Updates
        • Red, Yellow, Green Indicators
    • 4.6 Phase Five: Close Out the Project
      • Writing a Closeout Report
        • Additional Accomplishments
        • Dealing with Bad News
        • The Need for Follow-Up Activities
    • 4.7 Decision-Making Techniques
      • Four Types of Decision-Making Methods
    • 4.8 What to Do If/When the Project Gets Off Track
      • Some Issues out of Your Control
      • When a Project Gets behind Schedule
        • Perils of Adding Staff
      • Your Project Is Costing More Than Expected
    • 4.9 Useful Project Management Techniques
      • Project Teams
        • Candidates for the Project Team
      • Create a War Room
      • Formalized Project Frameworks
      • Participate in the Project Yourself
      • Offer Project Perks
      • Give Your Project a Code Name
      • Productive Project Meetings
        • Meeting Agendas
        • Minutes of the Meetings
        • The Hidden Cost of Meetings
        • Project Meeting Options
        • Useful Meeting Techniques
    • 4.10 Funding Projects
      • Estimating Costs: Go High
      • Projects Always Cost More Than Estimated
      • Exactly Who Is Going to Pay for It?
      • Justifying the Costs
    • 4.11 Multiple Projects: How to Juggle Them Well
      • You Will Have Multiple Projects
        • Prioritize by Time and Money
        • Prioritize by Politics
    • 4.12 Dealing with Non-IT Departments on a Project
      • Motivating Employees outside of Your Department
      • Who Is in Charge?
    • 4.13 Further References
  • Chapter 5: Software, Operating Systems, and Enterprise Applications
    • 5.1 Types of Software
    • 5.2 Operating Systems
      • Windows
      • Mac
      • Unix Variants and Linux
      • Choosing an Operating System
        • Applications in Your Environment
        • Customers' Needs
      • Multiple Operating Systems
        • Operating System Emulators
        • Virtual Machines
        • Uses
        • Virtual Desktop Infrastructure (VDI)
    • 5.3 Open Source
      • Definition
      • Cost
    • 5.4 Managing Software
      • Total Cost of Ownership (TCO)
      • Software Management Techniques
        • Deployment
        • Develop a Standard Disk Image
        • Select a Disk Cloning Package
        • Implement a Software Deployment Tool
        • Users Download Software from an Intranet
        • Locking down the Desktop
      • Software Licensing
      • Licensing Issues
        • Licensing Models and Types
        • Maintenance and Support Plans
        • Negotiating Licenses
        • Get Organized
    • 5.5 Cloud Computing
      • The Many Flavors of Cloud Computing
      • Private versus Public Cloud
      • Considerations When Moving to the Cloud
    • 5.6 Enterprise Applications
      • E-mail
        • Usage Statistics
        • Educate Your Users on the Key Principles of E-mail
      • Managing E-mail
        • Junk Mail (Spam, Chain Letters, Phishing, Jokes, etc.)
        • Harassment
        • Viruses
        • Data Size and Retention
        • Appropriate Use
        • E-mail Archiving
      • Unified Messaging
      • Directory Services
        • Moving toward a Single ID and Password
        • Directory Structure
    • 5.7 Enterprise Resource Planning (ERP)
      • The Value of ERP Software
      • General ERP Implementation Issues
      • Costs of Implementing ERP
      • Major Changes Required
      • It Isn't Only IT's Decision
      • Disadvantages to ERP
    • 5.8 Further References
  • Chapter 6: Managing the Money
    • 6.1 The Budgeting Process
      • Possible Budget Items
        • Which Items to Track
          • Personnel
          • Hardware
          • Software
          • Telecommunication Services
          • Supplies
          • Travel and Entertainment
          • Miscellaneous
          • Depreciation
          • Physical Plant
          • Outside Services
          • Overhead
      • Chargebacks-Who Really Pays?
      • Reviewers for Your Budget
      • Estimating (and Overestimating) Your Numbers
      • Getting Approval and Defending Your Budget
      • During the Year: Tracking and Revising Your Budget
        • Revising Your Budget
    • 6.2 The Difference between Capital Expenditures and Operating Expense Items
      • Capital Expenditure Details
      • Check with Your Company's Policies
      • Gray Areas
    • 6.3 Lease versus Buy: Which One Is Better?
      • Leasing
      • Who Makes This Decision?
    • 6.4 Other Budgeting Factors to Consider
      • Growth of Your Department's Workload
      • Technological Change
      • Staff
      • Software Maintenance
      • Hardware Maintenance
        • Time-and-Material (T&M) Contracts
          • Risks with T&M
          • Vendors´ T&M Policies
        • Warranties
    • 6.5 Managing Vendors
      • Establish a Relationship
      • Help Your Vendors
      • Request for Proposals
      • Get Multiple Bids
      • Set Up a Trial
      • Reviewing Contracts with Vendors
      • Evaluating Alternatives
      • Set Up a Matrix
        • Functionality
        • Price
          • Capital Investment
          • Operating Expenses and TCO
        • Vendor Viability
        • Training Required
        • Vendor's Services
        • Performance
        • Scalability
        • Support and Service
        • Interoperability
        • Product's Position in the Market
    • 6.6 Managing the Money during Difficult Times
      • Managing Costs
      • Leverage IT for Increased Business Value
      • Demonstrating Leadership
    • 6.7 Outsourcing and Offshoring
      • Offshore Outsourcing Overview
      • Which Functions to Outsource
      • Does Outsourcing Make Sense?
        • The Business Consideration
        • The Political Consideration
        • Conclusion
    • 6.8 Further References
  • Chapter 7: Getting Started with the Technical Environment
    • 7.1 The Technical Environment
      • What Do We Have Here?
      • Define Your Scope
      • The Elements
        • Wide Area Network (WAN) Environment
        • Local Area Network (LAN) Environment
        • Carrier Connections
        • Server and Storage Environment
        • Mobile Equipment
        • Workstations
        • Application and Software Inventory
        • Vendors
      • Tools for Tracking the Technical Environment
      • The Value of Good Infrastructure Documentation
      • What You May Find
    • 7.2 Understanding the User Environment
    • 7.3 TCO and Asset Management: What Are They?
      • Total Cost of Ownership
        • Calculating the TCO
      • Asset Management
    • 7.4 Standards
      • Issues That Users Care About
      • Issues That IT Cares About
      • Standards for IT
    • 7.5 Technology Refreshing
    • 7.6 Further References
  • Chapter 8: Security and Compliance
    • 8.1 How We Got Here
      • Get Perspective
      • Computer Security Themes
        • Security versus Privacy versus Convenience
        • Intention Matters
        • CIA
        • Look Very Closely: It May Not Be What It Appears
    • 8.2 Managing Security
      • Action 1: Evaluate Your Environment's Needs, Exposures, and Defenses
        • Perform a Security Audit
        • Risk Analysis and Risk Management
        • Risk Analysis
        • Risk Analysis Tools
        • Risk Management
        • Hire White Hats (to Manage the Threat of Black Hats)
      • Action 2: Get Upper Level Management Buy-In
      • Action 3: Mitigate the Risks
      • Action 4: Work with Users to Make Everyone More Secure
        • Training Users
        • Employee Impact
        • Use Care When Surfing
      • Action 5: Remember That Security Is an Ongoing Process
    • 8.3 Security Solutions and Technologies
      • Tracking and Controlling Access
        • Control Access
        • Tracking Activity
          • System Log Files
          • Monitoring Programs
          • Network Mapping Tools
          • Physical Access
        • Accounts and Passwords
          • Account Usage
          • User Terminations
          • Passwords
          • Special Privilege IDs
        • Access Reviews
        • Authorization Levels
      • Authentication
        • Challenge-Response
        • Two-Factor Authentication
        • Single Sign-On
        • Identity Management
        • Other User Authentication Methods
      • Security Defenses
        • Firewalls
        • Intrusion Detection and Prevention
        • Malware Prevention
        • Ongoing Maintenance
          • Log, Account, and Access Review
          • Software Patches and Updates
        • Encryption, Keys, and Certificates
        • Network Access Control
        • Staffing
      • Security Incident Response
    • 8.4 Types of Threats
      • Malware
      • Phishing and Social Engineering
    • 8.5 Compliance and IT
      • Overview
        • Personally Identifiable Information (PII)
      • Victims of Non-Compliance
    • 8.6 The Rules
      • Sarbanes-Oxley
      • Health Insurance Portability and Accountability Act (HIPAA)
      • Basel II
      • SB-1386
      • Massachusetts Data Protection Law
      • Fair and Accurate Credit Transactions Act (FACTA)
      • Gramm-Leach-Bliley
      • U.S. Securities
      • Patriot Act
      • Dodd-Frank Act
      • Office of Foreign Assets Control (OFAC)
      • CLERP-9 (Australia)
      • Personal Information Protection and Electronic Documents Act (PIPEDA)
      • Privacy and Electronic Communications Directive (European Union)
      • Data Protection Directive (European Union)
    • 8.7 How to Comply with the Rules
      • Document the Policies
      • Identify Control Mechanisms
      • Educate Employees
      • Maintain Evidence
    • 8.8 Hidden Benefits of Compliance
      • The Hidden Benefit of Documentation
      • The Hidden Benefit of Control Mechanisms
      • The Hidden Benefit of Educating Your Employees
      • Hidden Benefits of Maintaining Evidence
    • 8.9 Methodologies and Frameworks
      • IT Governance
      • Committee of Sponsoring Organizations (COSO)
      • Control Objectives for Information and Related Technology (COBIT)
      • IT Infrastructure Library (ITIL)
      • Capability Maturity Model Integration (CMMI)
      • International Organization for Standards (ISO 9000)
      • Six Sigma
    • 8.10 It's Not Just Regulatory Compliance
      • Electronic Discovery
      • Information and Records Retention
      • Working with Auditors
      • Disaster Recovery and Business Continuity
      • Definition of Policies and Procedures
      • Outsourcing
    • 8.11 Further References
  • Chapter 9: Disaster Recovery
    • 9.1 Defining the Scope
      • Key Questions
      • Recovery Time and Recover Point Objectives
      • Disaster Recovery Committee
      • Application Assessment
      • The Value of Your Data
    • 9.2 Creating a Disaster Recovery Plan
      • Communication Plan
      • Documentation
      • Real Estate and IT Facilities
        • Disaster Recovery Facilities Considerations
      • Off-Site Storage of Data
        • Backup Tapes
        • Data Replication
      • Hardware Availability
        • Size of Your Environment
        • Duplicating Your Entire Environment
        • Equipment at Home
      • Regular Updating and Testing
        • Review and Update
        • Testing
      • After the Disaster
      • Regional and Catastrophic Disasters
      • The ACT Model
    • 9.3 A Word about Incident Response, Business Continuity, and Disaster Recovery
    • 9.4 The Hidden Benefits of Good Disaster Recovery Planning
    • 9.5 Further References
  • Chapter 10: Working with Users
    • 10.1 Relationships with Users
      • Who Are Your Users?
      • Find Out Who Your Department Thinks Its Users Are
      • Find Out Who Your Boss Thinks Your Users Are
      • Meet the Users
      • Being Available and Reachable
      • Sharing Information
      • Collecting Information
      • Proactive Solutions
      • Being Flexible
      • User Training
        • In-House Classes
        • Third-Party Training Providers
        • Web-Based Training
        • User Education and Awareness
    • 10.2 The Consumerization of IT
      • How to Deal with Consumerization
      • Support Issues Associated with Consumerization and Handheld Devices
        • Depth and Breadth of Support
        • Security
        • Costs
      • Bring Your Own (BYO) Policies
    • 10.3 When Your Users Are Part of a Mobile Work Force
      • Techniques for Supporting Your Mobile Users
    • 10.4 The Help Desk
      • Typical Help Desk Activities
      • Procedures
        • Escalating a Call
      • Access
      • Self-Service
      • Tools
        • Call Tracking Software
        • Knowledge Base
        • Remote Control
        • Desktop Management
      • User Surveys
      • Measuring the Help Desk Workload
      • Staffing
        • Specific Considerations When Hiring for a Help Desk
        • Size of Support Staff
        • Staff Training
    • 10.5 Service Level Agreements
      • Positive Values of SLAs
      • Ask for Help from Your Staff
      • Writing Good SLAs
    • 10.6 Further References
  • Chapter 11: Connectivity...
    • 11.1 Get in Front of the Curve
      • The Blurry Line between Company-Owned and Personally-Owned Equipment (BYO Policies)
      • The New Technologies of Connectedness
      • Benefits and Challenges of Connectivity
      • Dealing with a Lot More Empowered Users
      • Wisdom of Crowds
    • 11.2 The Power of All These Connections
      • How Companies Use the Web
      • How Companies Use Intranets
      • How Companies Use Social Media and Mobile Devices
        • Ways That Help the Company
        • Ways That Don't Really Help the Company
      • Mobile Device Operating Systems, Apps, and Hardware
      • Handheld Hardware
        • Use of Mobile Devices
    • 11.3 How Does This Affect You as IT Manager?
      • Lead, Encourage, and Experiment
      • It's Not the Tools, But How They Are Used
        • Set Guidelines
        • Think of the Possibilities!
      • Remember Your Goals
      • What Is "Focused" and What Is "Distracted"?
    • 11.4 Further References
  • Glossary
  • Index