IT project

profilejesus2gewd
IT491WeekFourAssignment.doc

Herzing University “Career Focused, Convenient, Caring”

image1.png

Design Documentation – Week 4 - Implmentation

Course ID: IT 491 CAPSTONE PROJECT

Instructions:

This template must be filled out completely and turned into the course instructor by the end of the 5th week of class by Midnight. If you need assistance please contact the instructor prior to the due date. Please be sure to refer to instructor feedback from previous weeks before completing this assignment.

50 points

Due Date: Last day of week 4 by midnight.

Name:

Name:

Implementation Detail:

Now that you have determined your needs and created your network design, you should be able to smoothly implement your project. Provide detail about your implementation below. Be sure to include:

Installations (25 points): Provide detail about all operating system and software installations. Include screenshots during the installation phase and after successful installation. Describe any problems that you encountered and how you were able to work through the problem. You MUST provide screenshots that show the completed installation for each of the operating systems and required software applications.

System Management (25 points): Provide detail about any system management that you completed. This could include IP addressing, DNS setup, user management, security management, etc. You MUST provide screenshots that show the completed management for the key phases of your project. image2

IS 491 Capstone Project Herzing University Page 1 of 1

Filename: Week 5 IT 491 Capstone Project DESIGN DOCUMENT [Testing] - Template