excel assignment
Integer Programming Problems
IP Problem 1
A company is preparing to choose a group of capital projects to initiate. There are a total of five projects proposed. Each project lasts for three years, requiring investment in each of those years at the end of three years the project is expected to produce a return.
All of the projects look attractive, but there is only 200,000 that can be invested each year. Choose the set of projects that produces the highest overall return for the funds available.
IP Problem 2
A charitable organization plans to pack food boxes for distribution to needy families. They wish to fill some standard boxes that can hold a volume of 250. They have a large stock of donate items:
It is desired to maximize the total protein content of the box, subject to the volume limit. Determine how many of the available items to pack into each box.
IP Problem 3
A successful company is expanding and planning to build a factory in either of two cities (or both). In addition, a warehouse will be built, but it must be in a city where one of the factories was built. Investment levels and the Net Present Value (NPV) have been determined as:
There is a ten million available for the entire investment. Determine which cities for factory and warehouse locations such that NPV is maximized within investment limits.
IP Problem 4
An automobile maker is developing a low cost, fuel efficient vehicle for commercial use. Several alternative choices for engine, transmissions and suspensions. Formulate and solve an Integer Programming solution to find the lowest cost feasible combination.
123
1200,00050,00030,00020,000
2300,000100,00080,00050,000
3500,000150,000150,00050,000
4100,00050,0004,00010,000
5400,00050,00050,00050,000
Total
Return
Year
Project
ItemSizeProtein
A2525
B5040
C2015
D1515
E3010
F7085
G155
DecisionCostNPV
Factory in City 169
Factory in City 235
Warehouse in City 156
Warehouse in City 224
ComponentCostRemarks
Engines
Diesel$225Not compatible with Type A suspension
Electrical$180Not compatible with Type 1 or 2 Transmissions
Rotary$300
Transmissions
Type 1$150
Type 2$200
Type 3$200Not compatible with Type B Suspension
Suspensions
Type A$180
Type B$230