power points and five pages essay information system

profileitsvicki
informationsystemsProject1.docx

Final Report

· The report should be in APA (American Psychology Association) format. The report should be word-processed in Times New Roman 12 pt font and double spaced, with at least 23 double-spaced and numbered pages (with 1” margins on all sides), excluding figures, tables, illustrations, and references. Fewer pages will result in points deduction. A cover page is required. The report should include the following: o Course Information

· Team members with team leader indicated

· Abstract

· Introduction

· Main parts of the report

· the problem

· the context

· the architecture

· the state of art and the current best practice

· advantages and disadvantages

· recommendations

· Conclusion

· References (not counted for the length requirement of the report).

This is a team project. and need do two parts of the topic ( need slides of power point) and 5 pages essay for the same parts.

Topic : mobile operating systems

Part: advantage and disadvantage

And also need 5-8 minutes long presentation for these two parts

( 1 )