HVAC system design

profilecgomes
HVACDesign-FinalProject-Drawings-2021.pdf

3 A101

FD

40' - 0"8' - 0"

24 ' -

0 "

5' -

0 "

FD

S01

S02 S04

S09

P06

P14

P09

P10

E03

P11

S09

S10

S10

S10

S11

S02

S02

S13

S12

S13

4' -

6 "S14

4 A101

Sim

3 A101

Sim

5' - 4"

9' -

0 "

COORDINATE LOCATION w/ MEP

2' -

0 "

2' - 3 13/32"

1' -

6 "

5' - 4"

4"2% MAX CROSS SLOPE

A07

A34

S09

S10

S04

A36

A36

S17

S07

S08

S16

S01

S12

S13

S17

HDR01

101A 102

AA

104

AA

AA

AA 101B

AA

HDR01

HDR01 HDR01

HDR01 HDR01HDR01

HDR01

HDR01

HDR01

HDR01

AA BB

BBHDR01

HDR01: 6'-4" SPAN OR SMALLER (2) KING STUDS, (1) TRIMMER, (2) 2X6 BOX HEADER

AA

OPEN TO MTL PANEL CLG FINISH

2' - 0"

1' -

6 "

6' - 0"

4"

A40

S07

A04

S09

S10

S20

S19

S18

A34

A06

A41

A07

A36

A39

A36

2' -

0 "

MIN. 5% SLOPE

A44

A45

2' - 0"

1' -

0 "

Scale

Date

Drawn by

DRAWN BY:

CHECKED BY:

SDSU WO#

Architect:

Civil Engineer:

Jonathan Meendering South Dakota State University F&S e: [email protected] Ph: (605) 688-4975

Jason Petersen Civil Design Inc. e: [email protected] Ph: (605) 696-3200

Mechanical Engineer: Zack Rykhus South Dakota State University F&S e: [email protected] Ph: (605) 688-4532

Project Superintendent: Chris Eversgerd South Dakota State University F&S e: [email protected] Ph: (605) 690-0613

Plumbing: Emmett Harty South Dakota State University F&S e: [email protected] Ph: (605) 690-4316

Mechanical: Dylan Brugman Tessier's Inc. e: [email protected] Ph: (605) 336-3175

Electrical: Wayne Hansen South Dakota State University F&S e: [email protected] Ph: (605) 690-0483

Owner's Representative: Dr. Michele Dudash South Dakota State University Department of Natural Resource Management e: [email protected] Ph: (605) 688-6174

As indicated

3/ 22

/2 01

9 3:

28 :4

6 P

M

A101

Details, Foundation & Framing Plan

Research Support Facility

NRM

3/22/2019 JM

17-109667

JM

AJ

1/4" = 1'-0" 1 Foundation Plan

1" = 1'-0" 3 Detail - Stoop

1/4" = 1'-0" 2 Framing Plan

1" = 1'-0" 4 Detail - Slab Edge

Keynotes A04 FIBERGLASS REINFORCED PANELS, TYP. TO 8'; TRIM TYP. AT

EDGE TRANSITIONS; ALIGN PANEL JOINTS w/ EDGES OR CENTER LINE OF OPENINGS

A06 EXPOSED FASTENER WALL PANEL, MBCI 7.2 OR SIMILAR, 24 GA, SMOOTH PAINTED FINISH, COBALT BLUE

A07 PROVIDE METAL TRIM AT CORNERS, OPENINGS, AND MATERIAL TRANSITIONS; PROVIDE CLOSURE AND DRIP EDGE AT ROOF TRANSITIONS

A34 EXTERIOR WALL ASSEMBLY: EXPOSED FASTENER METAL SIDING, 1" RIGID INSULATION, BUILDING WRAP, 3/4" SHEATHING, 2X6 WOOD STUD FRAMING, R-20 BATT INSULATION (OR 3" CLOSED CELL SPRAY FOAM - NO VAPOR RETARDER REQ'D), VAPOR RETARDER, 1/2" FIBERGLASS REINFORCED PANEL

A36 TWO LAYERS OF 1 1/2" RIGID INSULATION, OFFSET JOINTS BETWEEN LAYERS, ADHERE VERTICAL INULATION TO FACE OF SLAB AND BACKFILL TO HOLD IN PLACE, TYP AT PERIMETER OF SLAB

A39 EXTERIOR GRADE FRP COVER BOARD; NUDO GROUNDBREAKER OR SIMILAR

A40 PVC TRIM AND SEALANT, TYP. AT FRP WALL PANEL JOINTS AND EDGES

A41 OVERLAP HORIZONTAL MTL FLASHING AND EXTERIOR PENTRATION EDGES w/ FLEXIBLE FLASHING

A44 PEA GRAVEL TYPICAL AT FOUNDATION PERIMITER A45 MINIMUM 6" TOP SOIL TYPICAL AT ALL DISTURBED AREAS E03 ELECTRICAL SERVICE CONNECTION & METER P06 TRENCH DRAIN P09 DOMESTIC WATER SERVICE CONNECTION & METER P10 CONNECT TO CONCRETE SEPTIC HOLDING TANK

(ALTERNATE INCLUDES MOUNDED DRAIN FIELD); SEE CIVIL DRAWINGS

P11 GAS SERVICE CONNECTION & METER P14 ADA RECESSED ROLL-IN FIBERGLASS SHOWER SURROUND,

GRAB BAR, SEAT, AND ADJ HT WAND; COORDINATE CONCRETE SLAB RECESS FOR FLUSH TRANSITION

S01 PROVIDE DRAINAGE COURSE BELOW ALL CONCRETE SLAB ON GRADE CONSTRUCTION

S02 SLOPE FLOOR SLAB TO TRENCH AND FLOOR DRAINS, COORDINATE CLEANOUT AND DRAIN ELEVATIONS w/ PLUMBING

S04 MINIMUM CONCRETE COVER FOR STEEL REINFORCING SHALL BE #5 BAR OR SMALLER 1-1/2"

S07 6"Wx8"H CMU BASE COURSE, FULLY GROUTED, W/ #5 HOOKED DOWELS AT 16" O.C.

S08 2X6 WOOD FRAMING TYP. AT EXTERIOR WALLS; PRESSURE TREATED SOLE PLATE

S09 SAW CUT CONTROL JOINT 1/2" DEEP AT SLAB PERIMETER, 2'-0" FROM SLAB EDGE

S10 5" CONCRETE SLAB ON GRADE w/ 6x6 w2.9xW2.9 WWM OVER VAPOR RETARDER AND 6" COMPACTED GRANULAR FILL; SEE DETAIL 4/A101 FOR THICKENED EDGE SLAB CONDITION

S11 RECESS SLAB; COORDINATE w/ ROLL-IN SHOWER MANUFACTURER'S INSTALLATION REQUIREMENTS FOR ZERO THRESHOLD INSTALLATION.

S12 5" CONCRETE STRUCTURAL STOOP w/ #4s @ 12" O.C. EACH EAY

S13 8"Wx5'-0" DEEP GRADE BEAM w/ (1) #6s TOP AND BOTTOM, #5s VERTICAL @ 24" O.C., TYP.

S14 4"x54"x54" CONCRETE EQUIPMENT PAD; COORDINATE LCOATION w/ MECHANICAL AND PLUMBING

S16 1/2" EXPANSION JOINT w/ ROD STOCK & SEALANT S17 #4 DOWELS @ 24" O.C. w/ THERMAL BREAK @ JOINT S18 6" COMPACTED GRANULAR BASE S19 #5 PERIMTER REBAR TOP & BOTTOM OF THICKENED EDGE S20 #5 BENT STEEL REPAR @ TYP. THICKENED EDGE

No. Description Date

Revision Sequence Number

GFCI

DATA

4 A102

3 A102

A08

A09

A12

A09

T Y

P

1' -

8 "

TYP

1' - 8" EDGE OF WALL BELOW

EDGE OF WALL BELOW

E D

G E

O F

W A

LL B

E LO

W

E D

G E

O F

W A

LL B

E LO

W

SLOPE 4:12

SLOPE 4:12

A14

A14

A15

A15

A08

P08

A14

2X Scissor Truss, 24' Span, 4:12 Top Chord, 3:12 Bottom Chord, Raised Heal, 4'-0" O.C.; Design & Installation Per Truss Manufacturer's Recommendations

2X 4

P ur

lin s

@ 2

'-0 "

O .C

.

1' -

8 "

24 ' -

0 "

1' -

8 "

1' - 8"40' - 0"1' - 8"

A08

A14

O.H.

1' - 8"

R ai

se d

H ee

l

2' -

0 "

8' -

8 "

T oW

A08A26

A15

A07

A08

A09

A06

S05

A28

A05

A07

A04

S08

A34

1' - 8"

V A

R IE

S

T O

W

.

A08

S15

S05

A28

A05

A04

S08

A06

A15

A14

A34

ToW 8' - 8"

HEAD HT 7' - 10"

A07

A41

A42

S06

A35

A42

A05

S05

A33

A06

A28

A43

A33

A35

A42

A34 A41

A06

A07

Scale

Date

Drawn by

DRAWN BY:

CHECKED BY:

SDSU WO#

Architect:

Civil Engineer:

Jonathan Meendering South Dakota State University F&S e: [email protected] Ph: (605) 688-4975

Jason Petersen Civil Design Inc. e: [email protected] Ph: (605) 696-3200

Mechanical Engineer: Zack Rykhus South Dakota State University F&S e: [email protected] Ph: (605) 688-4532

Project Superintendent: Chris Eversgerd South Dakota State University F&S e: [email protected] Ph: (605) 690-0613

Plumbing: Emmett Harty South Dakota State University F&S e: [email protected] Ph: (605) 690-4316

Mechanical: Dylan Brugman Tessier's Inc. e: [email protected] Ph: (605) 336-3175

Electrical: Wayne Hansen South Dakota State University F&S e: [email protected] Ph: (605) 690-0483

Owner's Representative: Dr. Michele Dudash South Dakota State University Department of Natural Resource Management e: [email protected] Ph: (605) 688-6174

As indicated

3/ 22

/2 01

9 3:

28 :5

0 P

M

A102

Framing Plan & Details

Research Support Facility

NRM

3/22/2019 JM

17-109667

JM

LO

1/4" = 1'-0" 2 Roof Plan

1/4" = 1'-0" 1 Roof Framing Plan

1" = 1'-0" 3 Detail - Eave

1" = 1'-0" 4 Detail - Rake

Keynotes A04 FIBERGLASS REINFORCED PANELS, TYP. TO 8';

TRIM TYP. AT EDGE TRANSITIONS; ALIGN PANEL JOINTS w/ EDGES OR CENTER LINE OF OPENINGS

A05 EXPOSED FASTENER MBCI PBU CORRUGATED METAL PANEL, 26 GA., SMOOTH PAINTED FINISH, SOLAR WHITE, TYP. AT CEILING w/ VAPOR RETARDER

A06 EXPOSED FASTENER WALL PANEL, MBCI 7.2 OR SIMILAR, 24 GA, SMOOTH PAINTED FINISH, COBALT BLUE

A07 PROVIDE METAL TRIM AT CORNERS, OPENINGS, AND MATERIAL TRANSITIONS; PROVIDE CLOSURE AND DRIP EDGE AT ROOF TRANSITIONS

A08 CONCEALED FASTENER ROOF PANEL, MBCI LOKSEAM OR SIMILAR, 24 GA., PROVIDE DRIP EDGE AND EDGE CLOSURE AT RAKE AND SOFFIT, STRIATED FINISH, SOLAR WHITE; SOFFIT TO MATCH

A09 5" K STYLE METAL GUTTER AND OPEN FACE DOWNSPOUTS w/ METAL DRIP EDGE, PROVIDE 4' CONCRETE SPLASH BLOCK AT EACH DOWNSPOUT; MATCH FINISH TO ROOF AND SOFFIT

A12 CONTINUOUS RIDGE VENT A14 METAL DRIP EDGE AND CLOSURE TYPICAL AT

EAVE AND RAKE; MATCH ROOF FINISH A15 VENTED METAL SOFFIT PANEL TYPICAL AT EAVE

AND RAKE; MATCH ROOF FINISH A26 2X WOOD FRAMING A28 LOOSE FILL FIBERGLASS ATTIC INSULATION;

R-49 MINIMUM A33 FIBERGLASS FRAME CASEMENT WINDOW,

DOUBLE PANE, LOW-E, ARGON FILLED, w/ BLACK SCREEN TYP.; PELLA IMPERVIA, MILGARD ULTRA SERIES, OR MARVIN INTEGRITY WINDOWS.

A34 EXTERIOR WALL ASSEMBLY: EXPOSED FASTENER METAL SIDING, 1" RIGID INSULATION, BUILDING WRAP, 3/4" SHEATHING, 2X6 WOOD STUD FRAMING, R-20 BATT INSULATION (OR 3" CLOSED CELL SPRAY FOAM - NO VAPOR RETARDER REQ'D), VAPOR RETARDER, 1/2" FIBERGLASS REINFORCED PANEL

A35 SOLID SURFACE SILL, GWB RETURN TYP. @ HEAD & JAMB

A41 OVERLAP HORIZONTAL MTL FLASHING AND EXTERIOR PENTRATION EDGES w/ FLEXIBLE FLASHING

A42 SEALANT & SPRAY FOAM INSULATION TYP. & PERIMETER OF PENETRATIONS

A43 WINDOW FRAME EXTENDER, TYP. @ EXTERIOR P08 PLUMBING VENT PENETRATION w/ RUBBER

BOOT, CLAMP, AND SEALANT S05 WOOD SCISSOR TRUSS, EXTEND TOP CHORD

AT EAVES, PROVIDE RAISED HEAL TO ALLOW ATTIC INSULATION AND VENTING FOR 18" LOOSE FILL INSULATION. TRUSS FRAMING AND CONNECTIONS TO BE DESIGNED BY MANUFACTURER.

S06 REFER TO HEADER SCHEDULE AND FRAMING DIAGRAM FOR FRAMING LAYOUT AT ALL OPENINGS, PROVIDE SPRAY FOAM INSULATION BEHIND BOX HEADERS

S08 2X6 WOOD FRAMING TYP. AT EXTERIOR WALLS; PRESSURE TREATED SOLE PLATE

S15 2x OUTRIGGER

1 1/2" = 1'-0" 5 Detail - Window Head

1 1/2" = 1'-0" 6 Detail - Window Sill

No. Description Date

Revision Sequence Number

FD

FD

W as

he r

Freezer Refrigerator

3 3

33

O S

O S

WP

W P

G F

C I

CO

CO

FD

CO

C U

01 GFCIGFCIGFCIGFCIGFCI GFCI

G F

C I

G F

C I

GFCI GFCI DED DED GFCI

GFCI

G F

C I

G F

C I

G F

C I

GFCI

G F

C I

O S

DATADATA

DATA

D A

T A

WP

A301

1

A301

A301

A3012

3

4

1 A201

2 A201

24 ' -

0 "

2' -

0 "

4' -

0 "

2' -

0 "

4' -

0 "

6' -

1 0"

3' -

2 "

2' -

0 "

85 SF

Restroom 104

2' - 0" 4' - 0" 2' - 0" 4' - 0" 3' - 8" 12' - 6" 4' - 0" 4" 8' - 0"

40' - 6"

2' - 0" 4' - 0" 2' - 0" 4' - 0" 2' - 0" 4' - 0"

714 SF

Multi-Purpose 101

56 SF

Mech/Elec 102

A1042

a

3 b

4 c

9' -

1 0"

8' -

2 "

4' -

0 "

2' -

0 "

A104

5 d

AAAA

AA

AA

AA

101A

101B

104

102

CLR

4' - 11 11/16"

M IN

3' -

2 "

1' -

6 "

4' -

6 "

TD

AA BB

BB

A02P06

P07

P07

P03

P02

P01A01

A01

P14

A104 1

AA

FR01

OF01

OF03

OF02

--- -

P11

WH01

CU01

FINISH MATERIALS

GWB GYPSUM WALL BOARD PAINTED ACT 2X2 ACOUSTICAL CEILING TILE ARMSTRONG WHITE FINE FISSURED DAMP LOCATIONS FRP FIBERGLASS REINFORCED PANEL WHITE INT WALLS PT01 PAINT DIAMOND VOGEL 0542 CAPTAIN NEMO DOORS & FRAMES PT02 PAINT DIAMOND VOGEL 0537 DOVES WING INT WALL SURFACES SC SEALED CONCRETE GHOSTSHIELD SILOXA-TEK 8500 INT FLOOR SURFACES MTL1 CONCEALED FASTENER ROOF MBCI LOKSEAM 24 GAUGE SOLAR WHITE EXT ROOF MTL2 EXPOSED FASTENER WALL MBCI 7.2 PANEL 24 GAUGE COBALT BLUE EXT WALLS MTL3 EXPOSED FASTENER CEILING MBCI PBU PANEL 26 GAUGE SOLAR WHITE INT CEILINGS

Scale

Date

Drawn by

DRAWN BY:

CHECKED BY:

SDSU WO#

Architect:

Civil Engineer:

Jonathan Meendering South Dakota State University F&S e: [email protected] Ph: (605) 688-4975

Jason Petersen Civil Design Inc. e: [email protected] Ph: (605) 696-3200

Mechanical Engineer: Zack Rykhus South Dakota State University F&S e: [email protected] Ph: (605) 688-4532

Project Superintendent: Chris Eversgerd South Dakota State University F&S e: [email protected] Ph: (605) 690-0613

Plumbing: Emmett Harty South Dakota State University F&S e: [email protected] Ph: (605) 690-4316

Mechanical: Dylan Brugman Tessier's Inc. e: [email protected] Ph: (605) 336-3175

Electrical: Wayne Hansen South Dakota State University F&S e: [email protected] Ph: (605) 690-0483

Owner's Representative: Dr. Michele Dudash South Dakota State University Department of Natural Resource Management e: [email protected] Ph: (605) 688-6174

As indicated

3/ 22

/2 01

9 3:

28 :5

1 P

M

A103

Floor Plans & Schedules

Research Support Facility

NRM

3/22/2019 Jonathan Meendering

17-109667

Jonathan Meendering

Amy Jones

1/4" = 1'-0" 1 Floor Plan

1/4" = 1'-0" 2 Reflected Ceiling Plan

Keynotes A01 OWNER FURNISHED AND INSTALLED EQUIPMENT

AND COUNTERTOPS A02 ADA RECESSED ROLL-IN FIBERGLASS SHOWER

SURROUND, GRAB BAR, SEAT, AND ADJ HT WAND; COORDINATE CONCRETE SLAB RECESS FOR FLUSH TRANSITION

A05 EXPOSED FASTENER MBCI PBU CORRUGATED METAL PANEL, 26 GA., SMOOTH PAINTED FINISH, SOLAR WHITE, TYP. AT CEILING w/ VAPOR RETARDER

A11 BIG ASS FAN HAIKU 60" DIA. CEILING FAN, ALUMINUM, REMOTE CONTROL, EXTENSION TUBE, FINISH: AW - ALUMINUM WHITE

A38 THROUGH WALL VENT CAP w/ BACKDRAFT DAMPER & BIRD SCREEN

E08 MAIN ELECTRICAL PANEL M02 INSTALL EXHAUST FAN IN BATHROOM, PLACE ON

OCCUPANCY SENSOR w/ RUN TIME ADJUSTMENT CAPABILITIES

M07 EXHAUST FURNACE & HW HEATER OUT SIDE WALL, CUT BACK PIPE @ 45 DEG. ANGLE, CUT INTAKE PIPE MAX. 3" FROM BUILDING w/ 90 DEG. ELBOW FACING DOWN

P01 SINGLE BASIN SCULLERY SINK w/ DISPOSAL; OWNER FURNISHED, VERIFY CONNECTIONS REQUIREMENTS

P02 UTILITY SINK CONNECTION; OWNER FURNISHED, VERIFY CONNECTION REQUIREMENTS

P03 WASH MACHINE CONNECTIONS; OWNER FURNISHED VERIFY CONNECTION REQUIREMENTS

P06 TRENCH DRAIN P07 FLOOR DRAIN P11 GAS SERVICE CONNECTION & METER P14 ADA RECESSED ROLL-IN FIBERGLASS SHOWER

SURROUND, GRAB BAR, SEAT, AND ADJ HT WAND; COORDINATE CONCRETE SLAB RECESS FOR FLUSH TRANSITION

Room Finish Schedule

Number Name Area Perimeter Floor Finish Wall Finish Base Finish

Ceiling Finish Comments

101 Multi-Purpose 714 SF 111' - 8" SC FRP/MTL CMU/RB MTL CMU base at ext walls, typ; suface mount conduit at clg 102 Mech/Elec 56 SF 31' - 6 3/4" SC FRP/MTL CMU/RB GWB CMU base at ext walls, typ 104 Restroom 85 SF 40' - 1 3/4" SC FRP/GWB CMU/RB ACT CMU base at ext walls, typ

No. Description Date

Revision Sequence Number

FD

FD

W as

he r

O S

O S

G F

C I

CO

FD

CO

C U

01

GFCI

GFCI

G F

C I

G F

C I

G F

C I

GFCI

G F

C I

SPARE

WP

A1042

a

3 b

4 c

56 SF

Mech/Elec 102

85 SF

Restroom 104

714 SF

Multi-Purpose 101

102

104

OF01

OF02

OF03

FR01

FX01

RH01

SD01

MI01

WS01

RH01

MI02

PT01

GB01

WC01

GB02 TP01

8' - 0"

9' -

1 0"

14 ' -

2 "

SE01

3' -

0 "

1' -

6 "

C oo

rd in

at e

w / M

N F

R

3' -

2 3

/1 6"

CU01

MDP

M1013

e

WH01

GB03

GB04

GB03

2' - 0"

3' -

2 "

3' - 0"3"

2' -

1 0"

3' -

2 "

2' -

1 0"

CONTROLS10 "

3' -

8 "

2' -

9 "

1' - 6"

2' -

0 "

MIRROR 1836

WRAP

PT01

MI01

SD01

WS01

GB01

TP01 WC01

GB02

FX01

GB03

SE01

104 FX01RH01

MI02

2' -

1 0"

GB03 GB04

FREE STANDING REMOVABLE BENCH SEAT

RH01

SE01

GB03

GB02

GB01

WC01TP01

2X2 ACOUSTICAL CEILING TILE

FRP WALL PANELS

EXPOSED FASTENER METAL CEILING PANELS

FRP WALL PANELS

3' -

0 "

7' - 0"

1' - 6" 2' - 0" 1' - 6" 2' - 0"

AA

1' -

0 "

8' -

0 "

4' - 0"

ALIGN PANEL JOINT w/ OPENINGS

Scale

Date

Drawn by

DRAWN BY:

CHECKED BY:

SDSU WO#

Architect:

Civil Engineer:

Jonathan Meendering South Dakota State University F&S e: [email protected] Ph: (605) 688-4975

Jason Petersen Civil Design Inc. e: [email protected] Ph: (605) 696-3200

Mechanical Engineer: Zack Rykhus South Dakota State University F&S e: [email protected] Ph: (605) 688-4532

Project Superintendent: Chris Eversgerd South Dakota State University F&S e: [email protected] Ph: (605) 690-0613

Plumbing: Emmett Harty South Dakota State University F&S e: [email protected] Ph: (605) 690-4316

Mechanical: Dylan Brugman Tessier's Inc. e: [email protected] Ph: (605) 336-3175

Electrical: Wayne Hansen South Dakota State University F&S e: [email protected] Ph: (605) 690-0483

Owner's Representative: Dr. Michele Dudash South Dakota State University Department of Natural Resource Management e: [email protected] Ph: (605) 688-6174

1/2" = 1'-0"

3/ 22

/2 01

9 3:

28 :5

9 P

M

A104

Enlarged Plan, Int Elev & Schedules

Research Support Facility

NRM

3/22/2019 Author

17-109667

Author

Checker

1/2" = 1'-0" 1 Floor Plan - Enlarged

1/2" = 1'-0" 2 Elevation a

1/2" = 1'-0" 3 Elevatin b

1/2" = 1'-0" 4 Elevation c

1/2" = 1'-0" 5 Elevation d

Specialty Equipment Type Mark Count Description

GB01 1 36" bobrick stainless steel grab bar GB02 1 42" bobrick stainless steel grab bar GB03 2 Shower grab bar GB04 1 Grab Bars MI01 1 18"x36" stainless steel framed mirror MI02 1 18"x60" stainless steel framed full length mirror OF01 1 Owner furnished freezer, provide power OF02 1 Owner furnished refrigerator, provide power OF03 1 Owner furnished washing machine, provide power, water, and sanitary connections PT01 1 Paper towel dispenser RH01 2 Stainless steel robe hook TP01 1 Pivoting Paper Holder

Plumbing Fixture Schedule Type Mark Count Manufacturer Model Comments

CO 3 Zurn Z1400-BZ-ZS level-trol adjustable leveling floor cleanout FD 3 Zurn FD2340 medium-duty adjustable floor drain, slope concrete floor to drain

FX01 1 American Standard

1662SG.211.002 commercial shower system w/ slide-grab bar, 1.5 gpm

OF01 1 Existing NA single basin SS scullery sink OF02 1 American

Standard 8344.212 wall mounted SS utility sink Owner furnished, provide wall mount utility

faucet SE01 1 Sterling 6206 ADA roll-in shower enclosure, 63"x39"x72" w/ grab bars TD 1 Zurn CPZ886-10 6"Wx120"L trench drain w/ bottom outlet, slope concrete floor to drain;

CPZ886-10 WC01 1 American

Standard 238AA115.020 VorMax ultra high efficiency elongated toilet w/ right had lever, color:

white, 238AA115.020, 12" RI, 1.0 gpf WH01 1 Bradford White RG130T6N WS01 1 American

Standard 0356.439.020; 705B105.002

Lucerne wall mount sink, right side faucet hole; selectronic integrated proximity faucet, 0.5 GPM

INSTALL (E) SALVAGED CASEW ORK AND

COUNTERTOPS

No. Description Date

Revision Sequence Number

A201 3

3"

1'-0"

4"

1'-0"

8' - 8" ToW

0' - 0" FF

-1' - 6"

MIN 5% SLOPE MAX 2% SLOPE

A04A04

A05

A11

A12

A08

A09A15A24 A24

P03

P01

A25

A01

S01

S05

102 104

004

006

F01

E07

MAX 2% SLOPE MIN 5% SLOPE

004 001

F01

001 001

A02

A03A04

A05

A06

A11

A12

A24

A28

A29

A31

A29S01

S03

S06

S08

S09

P14

E07

1' -

6 "

5% MINIUM SLOPE

O.H.

1' - 8"

R ai

se d

H ee

l

2' -

0 "

8' - 8" ToW

0' - 0" FF

7' - 10" HH

6' - 0"

9"

45.00°

3' - 2" SILL HT

A102 6

A102 5

VARIES BY TYPE

A101 4

Sim

A102 3

Sim

2' - 0"

S05

A28

A09 A15

A06

A05

S06

A32

A35

A33

A34 S07

S10

A36

A37

A07

A36 S01

S09

2' -

0 " 6

"

2' - 0"

A44

A45

Scale

Date

Drawn by

DRAWN BY:

CHECKED BY:

SDSU WO#

Architect:

Civil Engineer:

Jonathan Meendering South Dakota State University F&S e: [email protected] Ph: (605) 688-4975

Jason Petersen Civil Design Inc. e: [email protected] Ph: (605) 696-3200

Mechanical Engineer: Zack Rykhus South Dakota State University F&S e: [email protected] Ph: (605) 688-4532

Project Superintendent: Chris Eversgerd South Dakota State University F&S e: [email protected] Ph: (605) 690-0613

Plumbing: Emmett Harty South Dakota State University F&S e: [email protected] Ph: (605) 690-4316

Mechanical: Dylan Brugman Tessier's Inc. e: [email protected] Ph: (605) 336-3175

Electrical: Wayne Hansen South Dakota State University F&S e: [email protected] Ph: (605) 690-0483

Owner's Representative: Dr. Michele Dudash South Dakota State University Department of Natural Resource Management e: [email protected] Ph: (605) 688-6174

As indicated

3/ 22

/2 01

9 3:

29 :0

2 P

M

A201

Building Sections

Research Support Facility

NRM

3/22/2019 Author

17-109667

Author

Checker

3/8" = 1'-0" 1 Cross Section

3/8" = 1'-0" 2 Longitudinal Section

Keynotes P03 WASH MACHINE CONNECTIONS; OWNER

FURNISHED VERIFY CONNECTION REQUIREMENTS P14 ADA RECESSED ROLL-IN FIBERGLASS SHOWER

SURROUND, GRAB BAR, SEAT, AND ADJ HT WAND; COORDINATE CONCRETE SLAB RECESS FOR FLUSH TRANSITION

S01 PROVIDE DRAINAGE COURSE BELOW ALL CONCRETE SLAB ON GRADE CONSTRUCTION

S03 SIZE OF CONCRETE POURS BETWEEN CONSTRUCTION JOINTS SHALL BE: 3,600 SQ. FT. W/ A MAXIMUM DIMENSION OF 60 FT., W/ INTERMEDIATE CONTROL JOINTS AT 15 FT.

S05 WOOD SCISSOR TRUSS, EXTEND TOP CHORD AT EAVES, PROVIDE RAISED HEAL TO ALLOW ATTIC INSULATION AND VENTING FOR 18" LOOSE FILL INSULATION. TRUSS FRAMING AND CONNECTIONS TO BE DESIGNED BY MANUFACTURER.

S06 REFER TO HEADER SCHEDULE AND FRAMING DIAGRAM FOR FRAMING LAYOUT AT ALL OPENINGS, PROVIDE SPRAY FOAM INSULATION BEHIND BOX HEADERS

S07 6"Wx8"H CMU BASE COURSE, FULLY GROUTED, W/ #5 HOOKED DOWELS AT 16" O.C.

S08 2X6 WOOD FRAMING TYP. AT EXTERIOR WALLS; PRESSURE TREATED SOLE PLATE

S09 SAW CUT CONTROL JOINT 1/2" DEEP AT SLAB PERIMETER, 2'-0" FROM SLAB EDGE

S10 5" CONCRETE SLAB ON GRADE w/ 6x6 w2.9xW2.9 WWM OVER VAPOR RETARDER AND 6" COMPACTED GRANULAR FILL; SEE DETAIL 4/A101 FOR THICKENED EDGE SLAB CONDITION

Keynotes A24 HVAC DUCTWORK; SEE MECHANICAL FOR SIZES A25 RETURN AIR GRILL; SEE MECHANICAL FOR SIZE A28 LOOSE FILL FIBERGLASS ATTIC INSULATION; R-49

MINIMUM A29 INSULATED THICKENED EDGE FLOOR SLAB; R-14

MINIMUM, SEE DETAILS A31 5" REINFORCED CONCRETE SIDEWALK, SEE CIVIL A32 PAINTED GWB JAMB AND HEAD RETURN A33 FIBERGLASS FRAME CASEMENT WINDOW,

DOUBLE PANE, LOW-E, ARGON FILLED, w/ BLACK SCREEN TYP.; PELLA IMPERVIA, MILGARD ULTRA SERIES, OR MARVIN INTEGRITY WINDOWS.

A34 EXTERIOR WALL ASSEMBLY: EXPOSED FASTENER METAL SIDING, 1" RIGID INSULATION, BUILDING WRAP, 3/4" SHEATHING, 2X6 WOOD STUD FRAMING, R-20 BATT INSULATION (OR 3" CLOSED CELL SPRAY FOAM - NO VAPOR RETARDER REQ'D), VAPOR RETARDER, 1/2" FIBERGLASS REINFORCED PANEL

A35 SOLID SURFACE SILL, GWB RETURN TYP. @ HEAD & JAMB

A36 TWO LAYERS OF 1 1/2" RIGID INSULATION, OFFSET JOINTS BETWEEN LAYERS, ADHERE VERTICAL INULATION TO FACE OF SLAB AND BACKFILL TO HOLD IN PLACE, TYP AT PERIMETER OF SLAB

A37 NOT USED A44 PEA GRAVEL TYPICAL AT FOUNDATION PERIMITER A45 MINIMUM 6" TOP SOIL TYPICAL AT ALL DISTURBED

AREAS E07 EXTERIOR WALL PACKAGED LIGHT, SEE LIGHTING

SCHEDULE, CONTROL w/ MOTION AND AMBIENT LIGHT SENSOR AT DOOR 101A

P01 SINGLE BASIN SCULLERY SINK w/ DISPOSAL; OWNER FURNISHED, VERIFY CONNECTIONS REQUIREMENTS

Keynotes A01 OWNER FURNISHED AND INSTALLED EQUIPMENT

AND COUNTERTOPS A02 ADA RECESSED ROLL-IN FIBERGLASS SHOWER

SURROUND, GRAB BAR, SEAT, AND ADJ HT WAND; COORDINATE CONCRETE SLAB RECESS FOR FLUSH TRANSITION

A03 SHOWER CURTAIN AND ROD A04 FIBERGLASS REINFORCED PANELS, TYP. TO 8';

TRIM TYP. AT EDGE TRANSITIONS; ALIGN PANEL JOINTS w/ EDGES OR CENTER LINE OF OPENINGS

A05 EXPOSED FASTENER MBCI PBU CORRUGATED METAL PANEL, 26 GA., SMOOTH PAINTED FINISH, SOLAR WHITE, TYP. AT CEILING w/ VAPOR RETARDER

A06 EXPOSED FASTENER WALL PANEL, MBCI 7.2 OR SIMILAR, 24 GA, SMOOTH PAINTED FINISH, COBALT BLUE

A07 PROVIDE METAL TRIM AT CORNERS, OPENINGS, AND MATERIAL TRANSITIONS; PROVIDE CLOSURE AND DRIP EDGE AT ROOF TRANSITIONS

A08 CONCEALED FASTENER ROOF PANEL, MBCI LOKSEAM OR SIMILAR, 24 GA., PROVIDE DRIP EDGE AND EDGE CLOSURE AT RAKE AND SOFFIT, STRIATED FINISH, SOLAR WHITE; SOFFIT TO MATCH

A09 5" K STYLE METAL GUTTER AND OPEN FACE DOWNSPOUTS w/ METAL DRIP EDGE, PROVIDE 4' CONCRETE SPLASH BLOCK AT EACH DOWNSPOUT; MATCH FINISH TO ROOF AND SOFFIT

A11 BIG ASS FAN HAIKU 60" DIA. CEILING FAN, ALUMINUM, REMOTE CONTROL, EXTENSION TUBE, FINISH: AW - ALUMINUM WHITE

A12 CONTINUOUS RIDGE VENT A15 VENTED METAL SOFFIT PANEL TYPICAL AT EAVE

AND RAKE; MATCH ROOF FINISH

3/4" = 1'-0" 3 Wall Section

No. Description Date

Revision Sequence Number

Finish Floor 0"

Truss Bearing 8' - 8" Head Height 7' - 10"

B.O. Stoop -5' - 0"

B.O. Slab Edge -1' - 6"

AA AAAA

CU01

S14

A06

A09

A08

A12

E03E04

S13

M04

P11

A33

BB

CU01

A38

P11

P09

A06

A07

A14

S14

S13

M07

M04

AA AA

101B

BB

004

A12

A08

A06

A09

E06

S13 S13

E07

P13 E04

A33

Finish Floor 0"

Truss Bearing 8' - 8"

Head Height 7' - 10"

B.O. Stoop -5' - 0"

B.O. Slab Edge -1' - 6"

004

101A

AA AA

A14

A08

A07

E07

E06

S13

7' -

0 "

6' - 0"

101101A 101101B

101102

101104

SEE SCHEDULE

REMOVABLE MULLION

4' -

8 "

4' - 0"

3' -

0 "

4' - 0"

1tAA 1tBB

HEAD HT 7' - 10"

Scale

Date

Drawn by

DRAWN BY:

CHECKED BY:

SDSU WO#

Architect:

Civil Engineer:

Jonathan Meendering South Dakota State University F&S e: [email protected] Ph: (605) 688-4975

Jason Petersen Civil Design Inc. e: [email protected] Ph: (605) 696-3200

Mechanical Engineer: Zack Rykhus South Dakota State University F&S e: [email protected] Ph: (605) 688-4532

Project Superintendent: Chris Eversgerd South Dakota State University F&S e: [email protected] Ph: (605) 690-0613

Plumbing: Emmett Harty South Dakota State University F&S e: [email protected] Ph: (605) 690-4316

Mechanical: Dylan Brugman Tessier's Inc. e: [email protected] Ph: (605) 336-3175

Electrical: Wayne Hansen South Dakota State University F&S e: [email protected] Ph: (605) 690-0483

Owner's Representative: Dr. Michele Dudash South Dakota State University Department of Natural Resource Management e: [email protected] Ph: (605) 688-6174

As indicated

3/ 22

/2 01

9 3:

29 :0

4 P

M

A301

Exterior Elevations

Research Support Facility

NRM

3/22/2019 Author

17-109667

Author

Checker

1/4" = 1'-0" 1 North Elevation

1/4" = 1'-0" 2 East Elevation

1/4" = 1'-0" 3 South Elevation

1/4" = 1'-0" 4 West Elevation

Keynotes A06 EXPOSED FASTENER WALL PANEL, MBCI 7.2

OR SIMILAR, 24 GA, SMOOTH PAINTED FINISH, COBALT BLUE

A07 PROVIDE METAL TRIM AT CORNERS, OPENINGS, AND MATERIAL TRANSITIONS; PROVIDE CLOSURE AND DRIP EDGE AT ROOF TRANSITIONS

A08 CONCEALED FASTENER ROOF PANEL, MBCI LOKSEAM OR SIMILAR, 24 GA., PROVIDE DRIP EDGE AND EDGE CLOSURE AT RAKE AND SOFFIT, STRIATED FINISH, SOLAR WHITE; SOFFIT TO MATCH

A09 5" K STYLE METAL GUTTER AND OPEN FACE DOWNSPOUTS w/ METAL DRIP EDGE, PROVIDE 4' CONCRETE SPLASH BLOCK AT EACH DOWNSPOUT; MATCH FINISH TO ROOF AND SOFFIT

A12 CONTINUOUS RIDGE VENT A14 METAL DRIP EDGE AND CLOSURE TYPICAL AT

EAVE AND RAKE; MATCH ROOF FINISH A33 FIBERGLASS FRAME CASEMENT WINDOW,

DOUBLE PANE, LOW-E, ARGON FILLED, w/ BLACK SCREEN TYP.; PELLA IMPERVIA, MILGARD ULTRA SERIES, OR MARVIN INTEGRITY WINDOWS.

A38 THROUGH WALL VENT CAP w/ BACKDRAFT DAMPER & BIRD SCREEN

E03 ELECTRICAL SERVICE CONNECTION & METER E04 PROVIDE POWER TO SEPTIC TANK LOCATED

SOUTH OF BUILDING; PUMP AND ALARM E06 WEATHER RESISTANT EXTERIOR RECEPTACLE E07 EXTERIOR WALL PACKAGED LIGHT, SEE

LIGHTING SCHEDULE, CONTROL w/ MOTION AND AMBIENT LIGHT SENSOR AT DOOR 101A

M04 ROUTE VENT, INTAKE, REFRIGERANT LINES, AND GAS OVERHEAD. ROUTE CONDENSATE DRAIN TO FLOOR DRAIN

M07 EXHAUST FURNACE & HW HEATER OUT SIDE WALL, CUT BACK PIPE @ 45 DEG. ANGLE, CUT INTAKE PIPE MAX. 3" FROM BUILDING w/ 90 DEG. ELBOW FACING DOWN

P09 DOMESTIC WATER SERVICE CONNECTION & METER

P11 GAS SERVICE CONNECTION & METER P13 FROST FREE HOSE BIB S13 8"Wx5'-0" DEEP GRADE BEAM w/ (1) #6s TOP

AND BOTTOM, #5s VERTICAL @ 24" O.C., TYP. S14 4"x54"x54" CONCRETE EQUIPMENT PAD;

COORDINATE LCOATION w/ MECHANICAL AND PLUMBING

1/2" = 1'-0" DOORS

1/2" = 1'-0" WINDOWS

Door Schedule

Mark Frame Type

Frame Material Material

Head Height

Rough Width Count Comments

101A 001 MTL MTL 7' - 0" 6' - 2 1/2" 1 Exterior Door; Threshold 101B 002 MTL MTL 7' - 0" 3' - 4" 1 Exterior Door; Threshold 102 003 MTL MTL 7' - 0" 3' - 2 1/2" 1 Provide smoke seal and sweep 104 004 MTL MTL 7' - 0" 3' - 2 1/2" 1

Window Schedule

Mark Head Height

Rough Height

Rough Width Count Operation Comments

AA 7' - 10" 4' - 8 1/2" 4' - 0 1/2" 7 Casement Fiberglass windows; BB 7' - 10" 3' - 0 1/2" 4' - 0 1/2" 2 Casement Fiberglass windows;

No. Description Date

Revision Sequence Number

Pella Impervia, Milgard Ultra Series, or Marvin Integrity Fiberglass Frame, Double Pane, Low-e, Argon Filled Casement Window, Solid Color: White

Painted Finish: Diamond Vogel 0542 Captain Nemo