How do I do these?
Model
| M&D Chemicals | ||||
| Parameters | ||||
| Product A | Product B | Time Available | ||
| Processing Time (hours) | 2 | 1 | 600 | |
| Production Cost | $2.00 | $3.00 | ||
| Minimum Total Production | 350 | |||
| Product A Minimum | 125 | |||
| Model | ||||
| Product A | Product B | |||
| Gallons Produced | ||||
| Minimize Total Cost | ||||
| Provided | Required | |||
| Product A | 125 | |||
| Total Production | 350 | |||
| Hours Used | Hours Available | Unused Hours | ||
| Processing Time | 600 | |||