High School Athletics Master Plan

Year

Activity

Description

Materials/ Resources Required

First Year

· Construction of a softball venue for both boys and girls.

· Construction of basketball court.

· First freshmen admission

The first year will involve construction of two venues whose alternative options are lacking from the venues available in the public park. In that regard, softball venue and basketball court are among popular sports in high school.

A total of USD 440,000 where $250, 000 will go for construction of softball venue while $ 190, 000 goes for basketball court construction.

Excavator

Earth mover

Leveler

Second Year

· Application of artificial turf on softball surface.

· Carpeting bitumen and marking the basketball court.

· Admission of the second batch of freshmen.

The two activities will be carried out as part of finishing of the two construction projects.

A total of $65, 000 from the budget allocated in the first year.

Third Year

· Construction of boys’ and girls’ tennis venue

· Admission of the third batch of freshmen.

The rectangular tennis court to be constructed measures 78ft x 27 ft.

A budget of $220, 000 for purchase of needed materials.

Acrylic color coatings for a sand filled surface

The artificial turf

Forth Year

· Final touches on the tennis court

· Admission of the fourth and final batch of freshmen.

The final touches include erection of the 10 inch perimeter fence all-round the court.

Application of the artificial turf since it is the best shock absorbing surface (Wilson, 2013).

crack filling and re-coating of the acrylic surface

Fencing materials

The artificial turf

acrylic surface

Fifth Year

· Construction of swimming venue

Pool measurements are 25 or 50 m long, at least 1.35 m deep, and at least 8-lanes wide.

Indoor pool to conform to heating and lighting requirements

Budget of $250, 000

Excavator

Earth mover

Concrete

Cement

Tiles

Stainless steel

Sixth Year

Finishing and maintenance

Demarcation lines, pool guidelines and warning lines.

Water filling and draining

White and black demarcating materials

Seventh Year

· Construction of a jogging track and field

A 400-meter, regular eight-lane track

Installation of stone base phase using tracks.

Sideway stand for cheerleaders.

Budget of $180, 000

Tracks

Cement and concrete

Eighth Year

Finishing and maintenance

asphalt application on the tracks

Ensuring draining with continuous inlet drain of sports track

Tracks

Cement and concrete

Specialists

Ninth Year

· Construction of a golf course

Site clearing, earthwork which involves exaction and shaping.

Green construction which is the most technical part follows.

The final stage grassing.

Budget of $155, 000

Excavators

Specialist Machine Operators

Grassing Superintendent

Tenth Year

· Finishing and maintenance

Drainage

Irrigation

General maintenance.