due in 5 hours
Layout Strategies
PowerPoint presentation to accompany
Heizer, Render, Munson
Operations Management, Twelfth Edition, Global Edition
Principles of Operations Management, Tenth Edition, Global Edition
PowerPoint slides by Jeff Heyl
9
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
Outline
Global Company Profile: McDonald's
The Strategic Importance of Layout Decisions
Types of Layout
Office Layout
Retail Layout
Warehousing and Storage Layouts
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
2
Outline - Continued
Fixed-Position Layout
Process-Oriented Layout
Work Cells
Repetitive and Product-Oriented Layout
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
3
Innovations at McDonald's
Indoor seating (1950s)
Drive-through window (1970s)
Adding breakfast to the menu (1980s)
Adding play areas (late 1980s)
Redesign of the kitchens (1990s)
Self-service kiosk (2004)
Now three separate dining sections
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
4
Innovations at McDonald's
Indoor seating (1950s)
Drive-through window (1970s)
Adding breakfast to the menu (1980s)
Adding play areas (late 1980s)
Redesign of the kitchens (1990s)
Self-service kiosk (2004)
Now three separate dining sections
Six out of the seven are layout decisions!
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
5
McDonald's New Layout
Seventh major innovation
Redesigning all 30,000 outlets around the world
Three separate dining areas
Linger zone with comfortable chairs and Wi-Fi connections
Grab and go zone with tall counters
Flexible zone for kids and families
Facility layout is a source of competitive advantage
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
6
Learning Objectives
When you complete this chapter you should be able to:
9.1 Discuss important issues in office layout
9.2 Define the objectives of retail layout
9.3 Discuss modern warehouse management and terms such as ASRS, cross-docking, and random stocking
9.4 Identify when fixed-position layouts are appropriate
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
7
When you complete this chapter you should be able to:
Learning Objectives
9.5 Explain how to achieve a good process-oriented facility layout
9.6 Define work cell and the requirements of a work cell
9.7 Define product-oriented layout
9.8 Explain how to balance production flow in a repetitive or product-oriented facility
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
8
Strategic Importance of Layout Decisions
The objective of layout strategy is to develop an effective and efficient layout that will meet the firm’s competitive requirements
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
9
Layout Design Considerations
Higher utilization of space, equipment, and people
Improved flow of information, materials, or people
Improved employee morale and safer working conditions
Improved customer/client interaction
Flexibility
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
10
Types of Layout
Office layout
Retail layout
Warehouse layout
Fixed-position layout
Process-oriented layout
Work-cell layout
Product-oriented layout
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
11
Types of Layout
Office layout: Positions workers, their equipment, and spaces/offices to provide for movement of information
Retail layout: Allocates display space and responds to customer behavior
Warehouse layout: Addresses trade-offs between space and material handling
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
12
Types of Layout
Fixed-position layout: Addresses the layout requirements of large, bulky projects such as ships and buildings
Process-oriented layout: Deals with low-volume, high-variety production (also called job shop or intermittent production)
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
13
Types of Layout
Work cell layout: Arranges machinery and equipment to focus on production of a single product or group of related products
Product-oriented layout: Seeks the best personnel and machine utilizations in repetitive or continuous production
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
14
Layout Strategies
| TABLE 9.1 | Layout Strategies | ||
| OBJECTIVES | EXAMPLES | ||
| Office | Locate workers requiring frequent contact close to one another | Allstate Insurance Microsoft Corp. | |
| Retail | Expose customer to high-margin items | Kroger’s Supermarket Walgreen’s Bloomingdale’s | |
| Warehouse (storage) | Balance low-cost storage with low-cost material handling | Federal-Mogul’s warehouse The Gap’s distribution center | |
| Project (fixed position) | Move material to the limited storage areas around the site | Ingall Ship Building Corp. Trump Plaza Pittsburgh Airport |
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
Layout Strategies
| TABLE 9.1 | Layout Strategies | ||
| OBJECTIVES | EXAMPLES | ||
| Job Shop (process oriented) | Manage varied material flow for each product | Arnold Palmer Hospital Hard Rock Cafe Olive Garden | |
| Work Cell (product families) | Identify a product family, build teams, cross-train team members | Hallmark Cards Wheeled Coach Ambulances | |
| Repetitive/ Continuous (product oriented) | Equalize the task time at each workstation | Sony’s TV assembly line Toyota Scion |
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
Good Layouts Consider
Material handling equipment
Capacity and space requirements
Environment and aesthetics
Flows of information
Cost of moving between various work areas
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
17
Office Layout
Grouping of workers, their equipment, and spaces to provide comfort, safety, and movement of information
Movement of information is main distinction
Typically in state of flux due to frequent technological changes
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
18
Relationship Chart
Figure 9.1
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
Office Layout
Three physical and social aspects
Proximity
Privacy
Permission
Two major trends
Information technology
Dynamic needs for space and services
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
20
Retail Layout
Objective is to maximize profitability per square foot of floor space
Sales and profitability vary directly with customer exposure
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
Servicescapes
Ambient conditions - background characteristics such as lighting, sound, smell, and temperature
Spatial layout and functionality - which involve customer circulation path planning, aisle characteristics, and product grouping
Signs, symbols, and artifacts - characteristics of building design that carry social significance
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
Warehouse and Storage Layouts
Objective is to find the optimum trade-offs between handling costs and costs associated with warehouse space
Maximize the total "cube" of the warehouse – utilize its full volume while maintaining low material handling costs
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
23
Warehousing and Storage Layouts
All costs associated with the transaction
Incoming transport
Storage
Finding and moving material
Outgoing transport
Equipment, people, material, supervision, insurance, depreciation
Minimize damage and spoilage
Material Handling Costs
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
24
Warehousing and Storage Layouts
Warehouse density tends to vary inversely with the number of different items stored
Automated Storage and Retrieval Systems (ASRSs) can significantly improve warehouse productivity
Dock location is a key design element
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
25
Cross-Docking
Materials are moved directly from receiving to shipping and are not placed in storage in the warehouse
Requires tight scheduling and accurate shipments, bar code or RFID identification used for advanced shipment notification as materials are unloaded
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
26
Random Stocking
Typically requires automatic identification systems (AISs) and effective information systems
Allows more efficient use of space
Key tasks
Maintain list of “open” locations
Maintain accurate records
Sequence items to minimize travel, “pick” time
Combine picking orders
Assign classes of items to particular areas
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
27
Customizing
Value-added activities performed at the warehouse
Enable low cost and rapid response strategies
Assembly of components
Loading software
Repairs
Customized labeling and packaging
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
28
Fixed-Position Layout
Product remains in one place
Workers and equipment come to site
Complicating factors
Limited space at site
Different materials required at different stages of the project
Volume of materials needed is dynamic
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
29
Process-Oriented Layout
Like machines and equipment are grouped together
Flexible and capable of handling a wide variety of products or services
Scheduling can be difficult and setup, material handling, and labor costs can be high
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
30
Surgery
Radiology
ER triage room
ER Beds
Pharmacy
Emergency room admissions
Billing/exit
Laboratories
Process-Oriented Layout
Patient A - broken leg
Patient B - erratic heart pacemaker
Figure 9.3
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
31
Process-Oriented Layout
Arrange work centers so as to minimize the costs of material handling
Basic cost elements are
Number of loads (or people) moving between centers
Distance loads (or people) move between centers
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
32
Work Cells
Reorganizes people and machines into groups to focus on single products or product groups
Group technology identifies products that have similar characteristics for particular cells
Volume must justify cells
Cells can be reconfigured as designs or volume changes
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
33
Advantages of Work Cells
Reduced work-in-process inventory
Less floor space required
Reduced raw material and finished goods inventories
Reduced direct labor cost
Heightened sense of employee participation
Increased equipment and machinery utilization
Reduced investment in machinery and equipment
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
34
Requirements of Work Cells
Identification of families of products
A high level of training, flexibility and empowerment of employees
Being self-contained, with its own equipment and resources
Test (poka-yoke) at each station in the cell
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
35
Improving Layouts Using Work Cells
Current layout - workers in small closed areas.
Improved layout - cross-trained workers can assist each other. May be able to add a third worker as additional output is needed.
Figure 9.9 (a)
Material
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
36
Improving Layouts Using Work Cells
Current layout - straight lines make it hard to balance tasks because work may not be divided evenly
Improved layout - in U shape, workers have better access. Four cross-trained workers were reduced to three.
Figure 9.9 (b)
U-shaped line may reduce employee movement and space requirements while enhancing communication, reducing the number of workers, and facilitating inspection
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
37
Staffing and Balancing Work Cells
Determine the number of operators required
Workers required =
Total operation time required
Takt time
Determine the takt time
Takt time =
Total work time available
Units required to satisfy customer demand
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
38
Staffing Work Cells Example
600 mirrors per day required
Mirror production scheduled for 8 hours per day
From a work balance chart total operation time = 140 seconds
Standard time required
Operations
Assemble
Paint
Test
Label
Pack for
shipment
60
50
40
30
20
10
0
Figure 9.10
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
39
Staffing Work Cells Example
600 mirrors per day required
Mirror production scheduled for 8 hours per day
From a work balance chart total operation time = 140 seconds
Takt time = (8 hrs x 60 mins) / 600 units
= .8 min = 48 seconds
Workers required =
Total operation time required
Takt time
= 140 / 48 = 2.92
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
40
Repetitive and Product-Oriented Layout
Volume is adequate for high equipment utilization
Product demand is stable enough to justify high investment in specialized equipment
Product is standardized or approaching a phase of life cycle that justifies investment
Supplies of raw materials and components are adequate and of uniform quality
Organized around products or families of similar high-volume, low-variety products
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
41
Product-Oriented Layouts
Fabrication line
Builds components on a series of machines
Machine-paced
Require mechanical or engineering changes to balance
Assembly line
Puts fabricated parts together at a series of workstations
Paced by work tasks
Balanced by moving tasks
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
42
Product-Oriented Layouts
Fabrication line
Builds components on a series of machines
Machine-paced
Require mechanical or engineering changes to balance
Assembly line
Puts fabricated parts together at a series of workstations
Paced by work tasks
Balanced by moving tasks
Both types of lines must be balanced so that the time to perform the work at each station is the same
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
43
Product-Oriented Layouts
Low variable cost per unit
Low material handling costs
Reduced work-in-process inventories
Easier training and supervision
Rapid throughput
Advantages
High volume is required
Work stoppage at any point ties up the whole operation
Lack of flexibility in product or production rates
Disadvantages
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
44
McDonald's Assembly Line
Figure 9.11
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
Assembly-Line Balancing
Objective is to minimize the imbalance between machines or personnel while meeting required output
Starts with the precedence relationships
Determine cycle time
Calculate theoretical minimum number of workstations
Balance the line by assigning specific tasks to workstations
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
46
| TABLE 9.2 | Precedence Data for Wing Component | |||||
| TASK | ASSEMBLY TIME (MINUTES) | TASK MUST FOLLOW TASK LISTED BELOW | ||||
| A | 10 | – | ||||
| B | 11 | A | ||||
| C | 5 | B | ||||
| D | 4 | B | ||||
| E | 11 | A | ||||
| F | 3 | C, D | ||||
| G | 7 | F | ||||
| H | 11 | E | ||||
| I | 3 | G, H | ||||
| Total time | 65 |
Wing Component Example
This means that tasks B and E cannot be done until task A has been completed
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
47
| TABLE 9.2 | Precedence Data for Wing Component | ||||
| TASK | ASSEMBLY TIME (MINUTES) | TASK MUST FOLLOW TASK LISTED BELOW | |||
| A | 10 | – | |||
| B | 11 | A | |||
| C | 5 | B | |||
| D | 4 | B | |||
| E | 11 | A | |||
| F | 3 | C, D | |||
| G | 7 | F | |||
| H | 11 | E | |||
| I | 3 | G, H | |||
| Total time | 65 |
Wing Component Example
I
G
F
C
D
H
B
E
A
10
11
11
5
4
3
7
11
3
Figure 9.12
480 available mins per day
40 units required
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
48
480 available mins per day
40 units required
| TABLE 9.2 | Precedence Data for Wing Component | ||||
| TASK | ASSEMBLY TIME (MINUTES) | TASK MUST FOLLOW TASK LISTED BELOW | |||
| A | 10 | – | |||
| B | 11 | A | |||
| C | 5 | B | |||
| D | 4 | B | |||
| E | 11 | A | |||
| F | 3 | C, D | |||
| G | 7 | F | |||
| H | 11 | E | |||
| I | 3 | G, H | |||
| Total time | 65 |
Wing Component Example
I
G
F
C
D
H
B
E
A
10
11
11
5
4
3
7
11
3
Figure 9.12
Cycle time =
Production time available per day
Units required per day
= 480 / 40
= 12 minutes per unit
Minimum number of workstations
= 65 / 12
= 5.42, or 6 stations
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
49
| TABLE 9.3 | Layout Heuristics That May Be Used to Assign Tasks to Workstations in Assembly-Line Balancing | |
| 1. Longest task time | From the available tasks, choose the task with the largest (longest) task time | |
| 2. Most following tasks | From the available tasks, choose the task with the largest number of following tasks | |
| 3. Ranked positional weight | From the available tasks, choose the task for which the sum of following task times is the longest | |
| 4. Shortest task time | From the available tasks, choose the task with the shortest task time | |
| 5. Least number of following tasks | From the available tasks, choose the task with the least number of subsequent tasks |
Wing Component Example
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
50
Wing Component Example
Station 1
Station 2
Station 3
Station 4
Station 3
Station 5
Station 6
Station 6
I
G
F
H
C
D
B
E
A
10
11
11
5
4
3
7
11
3
Figure 9.13
480 available mins per day
40 units required
Cycle time = 12 mins
Minimum workstations
= 5.42 or 6
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
51
| TABLE 9.2 | Precedence Data for Wing Component | ||||
| TASK | ASSEMBLY TIME (MINUTES) | TASK MUST FOLLOW TASK LISTED BELOW | |||
| A | 10 | – | |||
| B | 11 | A | |||
| C | 5 | B | |||
| D | 4 | B | |||
| E | 11 | A | |||
| F | 3 | C, D | |||
| G | 7 | F | |||
| H | 11 | E | |||
| I | 3 | G, H | |||
| Total time | 65 |
Wing Component Example
I
G
F
C
D
H
B
E
A
10
11
11
5
4
3
7
11
3
Figure 9.12
480 available mins per day
40 units required
Cycle time = 12 mins
Minimum workstations
= 5.42 or 6
Efficiency =
∑ Task times
(Actual number of workstations) x (Largest cycle time)
= 65 minutes / ((6 stations) x (12 minutes))
= 90.3%
Idle Time = ((6 stations) × (12 minutes)) – 65 minutes = 7 minutes
9 - ‹#›
Copyright © 2017 Pearson Education, Ltd.
Copyright © 2017 Pearson Education, Ltd.
9 - ‹#›
52
= Time for task i
i=1
n
∑ Cycle time
=
Time for task i
i=1
n
å
Cycle time