Unit 2 Assignment: Calculating Project Budget Estimate Updates
In this Assignment, you are provided your sponsor-approved financials for your project’s labor. You
will need to go back to the project plan, or Gauchito Project W orkbook.xls (in Course Resources), to pull out your incremental material and equipment costs from the M&E Forecast tab. Your job will be to lay out only your Planned Value (PV) section of your Gauchito EVM Tool and/or Project (in Course
Resources). You will need to bring over your approved Gantt schedule for the Project W orkbook to accomplish this.
Based on the information from the Gauchito project plan, your company finance department provided
you with the following:
ID
Job Description
Immediate Predecessors
Planned Duration
(Weeks)
Staff (Number)
Rate/Pers on/Week
Task Cost (BAC)
A 1.0 ASSEMBLE ENGINE
MOUNT
Start
2
4
$1,440
$11,520
B 2.0 FIN PREPARATION Start 1 3 $1,440 $4,320
C 3.0 MARK FIN AND
LAUNCH LUG LINES
Start
1
3
$1,440
$4,320
D 4.0 INSERTING ENGINE
MOUNT
A
2
3
$1,440
$8,640
E 5.0 ATTACH FINS D 1 3 $1,440 $4,320
F 6.0 ATTACH SHOCK CORD Start 2 3 $1,440 $8,640
G 7.0 ASSEMBLE NOSE CONE Start 1 2 $1,440 $2,880
H 8.0 ATTACH
PARACHUTE/SHOCK CORD
G
1
1
$1,440
$1,440
I 9.0 ATTACH LAUNCH LUG E 1 1 $1,440 $1,440
J 10.0 PAINTING THE ROCKET I 1 4 $1,440 $5,760
K 11.0 APPLICATION OF DECALS
J
1
1
$1,440
$1,440
L 12.0 APPLYING CLEAR
COAT
K
1
1
$1,440
$1,440
M 13.0 DISPLAY NOZZLE
ASSEMBLY
K
1
3
$1,440
$4,320
N 14.0 ROCKET PREFLIGHT L 1 2 $1,440 $2,880
O 15.0 PREPARE FOR TEST
LAUNCH
N
1
1
$1,440
$1,440
2 of 3
You will notice that the accounting guys are running with a blended rate for all skill sets to include the
outsourced contracted fitters. Because this is the latest information, you include it in your Project
W orkbook to supersede what was provided in the Gauchito project plan, and then complete the
following:
Using the information in the Gauchito Project Plan, your Gauchito Project W orkbook (in Course Resources) your team put together as working references, and your company provided EVM
Tool Template (in Course Resources), construct in the EVM tool template your Planned Value (PV) section with a Gantt bar graph for the project depicting your critical path.
Graph your baseline with BAC and EAC identified.
Considerations:
All work packages within a subtask are executed in serial (F–S) fashion.
All subtasks within a task are executed in a serial (F–S) fashion.
All tasks (deliverables) are executed according to the Gauchito project plan appendix W G:
Gantt.
You will need an evening for data collection, an evening for compiling the data, and an evening to
write up your findings. For your project tools, use the examples and tools available in Course
Resources or the Internet that meets all the criteria of the grading rubric and complete the
requirement, using your assigned project scenario found in the Course Resources section of the
class website.
Directions for Submitting
1. Upload your Excel EVM tool in the Assignment Dropbox.
2. Ensure that your documents address the criteria of the rubric and follow the stated requirements.
3. Submit your Assignment to the Unit 2 Assignment link located in the Dropbox.
3 of 3
GM593 Unit 2 Assignment: Calculating Project Budget Estimate
Updates
Points
Possible
Points
Earned
Content
The necessary data for labor, equipment, material, duration, start, finish, and predecessors are correctly annotated as provided by the instructions into the Gauchito EVM tool.
10
A Gantt bar graph for the project BCW S (PV) was constructed in the
EVM tool template according to the provided table.
5
All tasks (deliverables) are executed according to the Gauchito project plan appendix WG: Gantt and/or Gauchito Project W orkbook tabs for labor costs, material costs, equipment costs, and schedule.
10
Task level activities are correctly scheduled with predecessors and
successor according to precedence relationships from the project plan
or project workbook.
5
A critical path is displayed according to CPM.
5
The depicted Cumulative Cost Curve/Baseline graph correctly
reflects the Planned Value.
5
The graph correctly depicts the project BAC and EAC for the start of the project.
5
Analysis
Response exhibits strong higher-order critical thinking and
analysis (e.g., evaluation). Submission shows original thought.
10
Analysis includes proper classifications, explanations, comparisons,
and inferences.
10
Critical thinking includes appropriate judgments, conclusions,
and assessment based on evaluation and synthesis of
information.
10
Total
75