research on sabic company
Research Report (datailed infromation).docx
Classification: Internal Use
Research Report
· 3.3 Content
· 3.3 (a ) Problem Identification
· 3.3 (b) Review of literature (needed 10 articles)
· 3.3 (c) Research methodology (use secondary data then no needed make a questionnaire , instrument used, statistical tests applied) Brief explanation
· 3.3 (d) Limitations
· 3.3 (e) Data analysis & interpretation
· (Research findings) Detail explanation
· Section 3
· Details of Training Experience
· 3.1Title: strategic alliance
· 3.2 Introduction
· 3.3 content (1000 – 1500 words)
· 3.4 Conclusion How useful the understanding of that system or skill (500- 350 words)
· REFERENCES
Guidelines for writing Field Training Report
The following points can be considered while writing the report:
1. The topic should fit into the focus of the training.
2. The report should not be text-bookish in nature.
3. Topic should be on contemporary developments/ issues.
4. The report should not have any copied content from other sources. Student must follow referencing methods (paraphrasing or summarizing).
5. The report should be original and the minimum size of the report must be around
2000- 2500 words.
6. The language should be simple, academic and easy to understand.
7. Organize the report in to various sub-heads with paragraphs so as to increase
readability.
8. There should be uniformity in the ideas covered in report and there should not be any disjointed ideas.
9. The footnotes should be properly explained. Use footnotes sparingly. Indicate the footnote on the same page.
10. The box items/ graphics should be properly acknowledged.
11. The references to be given as per norms.
The structure of the report should be as follows:
Structure of the report: It consists of a title, introduction, contents and author’s views, conclusion and references.
1. Introduction gives an idea about the subject matter of the report, and it should be of about half a page
2. Contents should be well developed, time-relevant and should contribute to the
Existing knowledge. It should have in-depth analysis of the training.
3. Conclusion includes the gist of the report or alternately brief analysis of the contents.
4. References: References to the article should be given as follows:
Newspaper- Author, title of the article, name of the
Newspaper, date of publication
Magazine- Author, Title of the article, name of the
Magazine, month, vol.& issue no., pp. no.
Journal- Author, (year of publication), title of the
Article, name of the journal, month, vol.&
Issue no., pp. no.
Book- Author,( year of publication), name of the
Book, publisher
·
·
SABIC - strategic alliance final report.pdf
JULY 2018
STRATEGIC ALLIANCE FINAL REPORT
2
Classification: Internal Use
DISCLAIMER
Important message to any person not authorized to have access to this report.
Any person who is not an addressee of this report or who has not signed and returned to PricewaterhouseCoopers a Release Letter is not authorized to have access to this report.
Should any unauthorized person obtain access to and read this report, by reading this report such person accepts and agrees to the following terms:
1. The reader of this report understands that the work performed by PricewaterhouseCoopers was performed in accordance with instructions provided by our addressee client and was performed exclusively for our addressee client’s sole benefit and use.
2. The reader of this report acknowledges that this report was prepared at the direction of our addressee client and may not include all procedures deemed necessary for the purposes of the reader.
3. The reader agrees that [PricewaterhouseCoopers], its partners, principals, employees and agents neither owe nor accept any duty or responsibility to it, whether in contract or in tort (including without limitation, negligence and breach of statutory duty), and shall not be liable in respect of any loss, damage or expense of whatsoever nature which is caused by any use the reader may choose to make of this report, or which is otherwise consequent upon the gaining of access to the report by the reader. Further, the reader agrees that this report is not to be referred to or quoted, in whole or in part, in any prospectus, registration statement, offering circular, public filing, loan, other agreement or document and not to distribute the report without PricewaterhouseCoopers’ prior written consent.
3
Classification: Internal Use
TABLE OF CONTENTS
Section Overview
1 Project overview
2 SABIC’s strategic alliances 6 step framework
3 Step 1 - planning and preparation
4 Step 2 - segmenting suppliers – including polls
5 Step 3 - identifying potential alliance candidates
6 Step 4 - approaching alliance candidates
7 Step 5 & 6 - developing the outline and executing the alliance
Appendix
1. Introduction to strategic alliances
2. Benchmarking and case study
3. Strategic alliances data analysis
4. Strategic alliance toolkit
5. Strategic alliance process framework
4
SECTION 1
PROJECT OVERVIEW
5
Classification: Internal Use
PWC WAS APPOINTED TO SUPPORT SABIC IN DEVELOPING AND EXECUTING A STRATEGIC ALLIANCE FRAMEWORK…
As part of SABIC’s mission to become a top quartile procurement function amongst the leading companies globally, PwC was appointed to develop a framework in which to establish strategic alliances.
Phase 1: Synthesis & baseline understanding Phase 2: Design & create
Assess current
alliance criteria
1
Baseline criteria for alliances
2
Define alliance mechanism
3
Develop process,
R&Rs, policies
4
Design alliance toolkit & templates
5
Our approach:
6
Classification: Internal Use
…WHICH WAS EXECUTED IN 8 WEEKS
Activity May June July
27th 3rd 10th 17th 24th 1st 8th 15th
B 1 . A
s s
e s
s
c u
rr e
n t
a lli
a n
c e
c ri
te ri
a
Understand current strategic objectives over 2-3 years
Conduct current state assessment meetings
Document potential gaps in criteria
B 2
. B
a s
e lin
e
c ri
te ri
a
Design fit for purpose segmentation criteria
Conduct workshop with relevant stakeholders
B 3
. D
e fi
n e
A
lli a
n c e
m
e c h
a n
is m
Develop supplier segmentation tool
Hold validation workshop with relevant stakeholders Eid break Eid break
Define and finalize alliance strategies
B 4
. D
e v
e lo
p
p ro
c e
s s
, R
& R
s ,
p o
lic ie
s
Develop details of strategic supplier alliance process
Define relevant policies which govern the new processes
Define a detailed RACI matric for each process
B 5
. D
e s
ig n
a
lli a
n c e
t o
o lk
it &
t e
m p
la te
s Design tool to measure health of strategic alliance
Design alliance charter including templates, KPIs, etc.
Design alliance participation letter
Project Management
Workshop #1
Project kick off
Finalized supplier segmentation criteria
Strategic alliance toolkit
Finalized supplier segmentation tool
Workshop #2
Workshop
Weekly Status Update
7
Classification: Internal Use
OUR COMPREHENSIVE DELIVERABLES HAVE BEEN DEVELOPED TO ENSURE CONTINUED SUCCESS IN ESTABLISHING STRATEGIC ALLIANCES AT SABIC
# Deliverable Description Snapshot of deliverables
1 Supplier segmentation model Model which segments suppliers against pre-set, weighted criteria to map them on the segmentation matrix
2 Supplier segmentation report Report which highlights the segmentation methodology and how the potential alliances were derived from the pool of ~5000 suppliers
3 Strategic alliance process framework Framework which outlines the strategic alliance detailed processes that should be deployed by SABIC based on leading practice
4 Strategic alliance health check questionnaire Questionnaire which measures the overall health of the strategic alliance through pre-established questions to complete periodically
5 Strategic alliance charter Document which serves as an agreement between SABIC and the supplier to define governance, roles and responsibilities, KPIs, etc. of the alliance
6 Strategic alliance participation letter Document which serves as an introductory approach to the supplier when gauging their interest in an alliance with SABIC
7 Strategic alliance presentation templates PowerPoint templates which will be used throughout the alliance duration to track performance and risks/ issues
8
SECTION 2
6 STEP STRATEGIC ALLIANCE
FRAMEWORK
9
Classification: Internal Use
WE DEVELOPED A 6 STEP STRATEGIC ALLIANCE FRAMEWORK TO PROVIDE GUIDANCE FROM STRATEGY THROUGH EXECUTION
Planning and preparation • Define SABIC alliance
vision & objectives • Team formation • Benchmark studies • Data gathering
1
Segment suppliers based on criteria
• Selection criteria • Best practices • Segmentation tool
2
Identify potential alliance candidates
• Shortlist final suppliers • Segmentation matrix
3
Approach alliance candidates for buy-in
• Size opportunity • Acquire approval
4
Develop outline alliance with supplier
• Collaboration charter • KPIs • Performance
management
5
Execute & manage the alliance
Sign-off by SABIC CEO
6
SABIC strategic alliance lifecycle & stakeholder engagement:
GPS
Manufacturing Manufacturing
E&PM E&PM
LC team LC team
T& I T & I
Legal Legal
Suppliers
Obtain supplier buy-in
S ta
k e
h o
ld e
r E
n g
a g
e m
e n
t
1Research and Technology
10
SECTION 3
STEP 1 - PLANNING AND PREPARATION
11
Classification: Internal Use
WE DEFINED THE OBJECTIVES OF STRATEGIC ALLIANCES BY REVIEWING SABIC’S OVERALL VISION AND BY ENGAGING MULTIPLE STAKEHOLDERS
SABIC strategic alliance objective setting
Conducted strategic alliance team workshop
We ran a workshop with the immediate strategic alliance team in order to confirm understanding and ensure alignment on the key objectives and focal areas
Deployed an objectives survey and analysed findings
We conducted a survey for the wider stakeholders to rank the most important to least important priority areas to ensure the strategic alliance objectives capture these focus points
Reviewed SABIC’s strategic vision
We conducted an assessment of SABIC’s overall mission to ensure the strategic alliance objectives are in line with the broader organisational goals
12
Classification: Internal Use
THE RESULTS FROM OUR OBJECTIVES SURVEY SHOWED THAT EHSS SAFETY, UNIT COST AND MAINTENANCE COST REDUCTION WERE THE TOP PRIORITIES
The following objectives/initiatives were ranked from most important to least, which the wider stakeholder felt should be the top priority for SABIC to collaboratively work on with its strategic suppliers
8.08
12. Improve engagement between suppliers and plants through continuous data sharing10.38
11. Early access to future cutting-edge technologies and opportunity to be part of piloting with suppliers
1. EHSS safety incidents reduction
3. Maintenance cost reduction5.46
5.25
2.89
5.57
2. Unit cost reduction
7.27
8. Local content increase7.00
7. Efficiency increase of plants utilizing latest techniques provided by suppliers (e.g. predictive analysis, etc.)
7.68
6. Production losses and disruptions minimization
5.65
4. Competency development, people knowledge transfer and skills improvement through training programs
10. Innovative solutions and products implementation
6.64
5. Technical support improvement by suppliers (e.g. on-time and on-site technical support availability, etc.)
9. Inventory cost reduction
6.00
Average ranking position Objectives
TOP 3 PRIORITY AREAS
13
Classification: Internal Use
BASED ON OUR ASSESSMENT, WE DEFINED 4 KEY OBJECTIVES FOR STRATEGIC ALLIANCES
Strategic Alliance
02 Enhance business continuity
Reduce safety incidents
Increase reliability
Reduce production losses/ disruptions
Cost-out Reduce unit cost
Reduce inventory cost
Reduce maintenance cost
01
Build competency capability
Improve people knowledge & skills
Improve productivity
03 04 Access to technology & data
New technologies
New innovative solutions
Data sharing
Strategic Alliance
Planning and preparation
1
Local Content
14
SECTION 4
STEP 2 - SUPPLIER SEGMENTATION
15
Classification: Internal Use
OUR SEGMENTATION APPROACH WAS DEVELOPED TO SHORTLIST THE 5000+ SUPPLIERS TO 5-10 POTENTIAL ALLIANCES
Input to segmentation Supplier segmentation through tool Segmented outputs
• Suppliers segmented on matrix based on score across enablement v/s efficiency
• Individual supplier scores adjusted, as required, on detailed review upon business objectives
Workshops and meetings: These contributed to validation of segmentation criteria, understanding of general supply base and special cases.
Market research & benchmarking: Benchmarking & research was conducted on specific suppliers to understand best practices, supplier offerings, and capture essential data for segmentation.
Strategic alliance objectives: The objectives defined gave us a general direction and vision for alliances which helped us further define our criteria in line with the objectives.
5000+ suppliers
38 suppliers
5-10 suppliers1
Segment suppliers based on criteria
2
1Final alliance candidates to be defined
16
Classification: Internal Use
TO REACH THE SHORTLISTED 38, WE CONDUCTED AN INITIAL FILTRATION EXERCISE
Filter by type of supplierClassification by spend
Relevant suppliers for strategic
alliance1
Shortlisted suppliers
SABIC total suppliers
(past 5 years)
I II
High Spend (50mn+ SAR)
Excluded: Non-core businesses (transportation,
IT, medical, raw material, etc.) Sole source suppliers Traders, agents, distributors Limited # of affiliates served Limited experience
5000+ 38
1Categories excluded: logistics, projects, transportation, insurance and medical
The 38 suppliers need to be further segmented based upon defined segmentation criteria to be able to focus SABIC efforts on truly strategic suppliers
Segment suppliers based on criteria
2
17
Classification: Internal Use
THE 38 SHORTLISTED SUPPLIERS SERVE 110+ CATEGORIES WITH MORE THAN 10 YEARS OF EXPERIENCE1 WITH SABIC
Segment suppliers based on criteria
2
1Information is based on averages of the 38 suppliers
Key statistics1
Materials & services
affiliates served
10+
SABIC categories served
110+
Bilfal10
ABB1
Alfa Laval5
Asco 9
Borsig14
Eagle Burgmann18
Burckhardt22
Caterpillar26
Coperion31
Danieli35
Elliott2
Emerson6
Endress & Hauser11
Ericsson15
Flowserve19
Gulf Heavy Industries Co.23
Hitachi32
Honeywell36
Inmasteel3
John Crane7
Kobelco12
Koch16
Kubota20
Linde24
Manoir29
Midrex33
Mitsubishi37
Mollers4
Saudi Valves8
ThyssenKrupp13
Schneider17
Siemens21
Sumitomo25
Tomoe30
Yokogawa34
York38
Schmidt28GE27
AC MOTOR
COMPRESSOR GEARBOX FURNACE PELLETIZER EXTRUDERS PRESSURE VESSEL HEAT EXCHANGER SHELL AND TUBE ROLLING MILL STAND HEATER
years of experience with SABIC
10+
Top 10% products supplied:
18
Classification: Internal Use
IN ORDER TO FURTHER DIFFERENTIATE THE 38 SUPPLIERS, WE INITIALLY CAME UP WITH 17 CRITERIA
Enablement
Finance criteria
Efficiency
Operations criteria
1 Total spend
2
3
SABIC % revenue to supplier
Total sales to supplier
1
2
# of served affiliates
3
4
Production losses
5
Local content score
6
# of global regions served
7
# of SABIC focus areas
Part of performance killer list?
# of RL1 & RL2 equipment
Technology criteria People criteria
R&D expense % of revenue
2 # of patents in category
3 Critical to innov./product/service
1 1 # of training/knowledge academies
2 # of certifications offered
3 # of partnerships with universities
4 Quality of program
Segment suppliers based on criteria
2
19
Classification: Internal Use
WE CONDUCTED A WORKSHOP TO SHORTLIST, VALIDATE AND WEIGH THE SEGMENTATION CRITERIA
1. Agree on the preliminary strategic alliance toolkit and any exclusions or additions
2. Understand the process framework behind strategic alliance
3. Understand principles of supplier segmentation and the segmentation levels
4. Define and agree on the supplier segmentation criteria and weighting
Objectives Outcomes
Validated and weighed segmentation criteria and obtained stakeholder sign-off
Segment suppliers based on criteria
2
20
Classification: Internal Use
1Workshops conducted with the wider business as well as affiliates
WE REFINED AND ASSIGNED WEIGHTS THROUGH OUR FIRST SEGMENTATION WORKSHOP1
Finance: Total sales to supplier for the past 5 years 7%
9%
4%
Operations: Are they part of the performance killer list?
Operations: Level of demand anticipated in next 3 years
8%
Operations: Production losses (SAR mn) related to their equipment
Operations: # of SABIC focus areas supplier provides equipment in
5%
Operations: Local content score 6%
Operations: # of equipment under RL1 and RL2 list
10%
Finance: % of revenue that SABIC represents for the supplier
Finance: Total spend for the past 5 years
12%
Operations: # of served affiliates
11%
13%
Operations: # of global regions served for SABIC
9%
1%Operations: # years of experience with SABIC
Finance: Supplier financial stability
Operations: Latest supplier performance score 3%
2%
People: Quality of training programs 14%
Technology: # of patents in the category for the alliance
Technology: R&D expense as a % of revenue
Technology: Criticality to future innovations/products/services
People: # of partnerships with universities 4%
18%
21%
25%
People: # of certifications offered
People: # of training/knowledge academies 7%
11%
E n
a b
le m
e n
t E
ff ic
ie n
c y
No added value, same
answers for all
Data to be captured at later stage
Will be considered as
tie breaker
Redundant criteria
Segment suppliers based on criteria
2
21
Classification: Internal Use
OUR FINALISED SEGMENTATION CRITERIA BASED ON THE OUTPUT FROM OUR FIRST WORKSHOP
Enablement
Finance criteria
Efficiency
Operations criteria
1 Total spend
2
3
SABIC % revenue to supplier
Total sales to supplier
1
2
# of served affiliates
Production losses
3
4
5
# of SABIC focus areas
Part of performance killer list?
# of RL1 & RL2 equipment
Technology criteria People criteria
R&D expense % of revenue
2 # of patents in category
3 Critical to innov./product/service
1 1 # of training/knowledge academies
2 # of certifications offered
3 # of partnerships with universities
Segment suppliers based on criteria
2
22
Classification: Internal Use
WE THEN CONDUCTED A SECOND WORKSHOP TO GAIN A MANUFACTURING PERSPECTIVE TO RE-VALIDATE THE CRITERIA
Enablement
Finance criteria
Efficiency
Operations criteria
1 Total spend
2
3
SABIC % revenue to supplier
Total sales to supplier
1
2
# of served affiliates
Production losses
3
4
5
# of SABIC focus areas
Part of performance killer list?
# of RL1 & RL2 equipment
Technology criteria People criteria
R&D expense % of revenue
2 # of patents in category
3 Critical to innov./product/service
1 1 # of training/knowledge academies
2 # of certifications offered
3 # of partnerships with universities
Segment suppliers based on criteria
2
# SABIC focus areas
Production Losses
Part of performance
killer list? # RL1 & RL2 equipment
45% Total weight to redistribute
23
Classification: Internal Use
AS PART OF WORKSHOP 2 WE RE-ASSIGNED WEIGHTS TO THE EFFICIENCY CRITERIA ITEMS
Operations criteria
1
2
3
Production losses
4
# of SABIC focus areas
Part of performance killer list?
# of RL1 & RL2 equipment
Old weight
New weight
13% 20%
11% 12%
12% 8%
9% 5%
+7%
+1%
-4%
-4%
1. Validate and agree key strategic suppliers
2. Define strategic alliance and understand the differences between other types of supplier relationships
3. Develop an understanding of SABIC’s 6 step strategic alliance framework
4. Communicate our current progress on the strategic alliance initiative
5. Obtain manufacturing input into the supplier segmentation activity
Objectives Outcomes
Validated efficiency criteria and re-weighed segmentation criteria items
Segment suppliers based on criteria
2
24
Classification: Internal Use
WE FINALISED OUR EFFICIENCY CRITERIA DEFINITION, SCORING AND WEIGHTING BASED ON BOTH WORKSHOP OUTPUTS
Area # Segmentation Criteria Scoring Guideline
New Weighting 1 - Low 2 - Medium 3 - High 4 – Very High
Efficiency
1 Total spend for the past 5 years <80mn 80mn-200mn 200mn-400mn 400mn + 16%
• Total spend (SAR mn) in the past 5 FY
2 SABIC % revenue to supplier <1% 1-10% 10-20% 20% + 15%
• % of revenue that SABIC represents for the supplier
3 # of served affiliates <10 10 - 15 15 - 20 >20 14%
• # of affiliates served as of last FY
4 Production losses (SAR mn) <10mn 10mn-24mn 24mn-38mn 38mn + 20%
• Total production losses related to their equipment (SAR mn) in the past 5 FY
5 Performance killer list? No N/A N/A Yes 8%
• Is this supplier currently on the performance killer list?
6
# of SABIC focus areas supplier provides equipment in
1 focus area 2 focus areas 3 focus areas 4 focus areas 12%
• # of SABIC's 4 focus areas supplier provides equipment in
7 Total sales to supplier for the past 5 years <1mn 1mn-20mn 20mn-100mn 100mn + 10%
• Total sales (SAR mn) in the past 5 FY
8 # of equipment under the RL1 and RL2 list 0 to 20 20 to 100 100 to 1000 1000 + 4%
• # of equipment that could potentially cause production losses
Segment suppliers based on criteria
2
25
Classification: Internal Use
WE FINALISED OUR ENABLEMENT CRITERIA DEFINITION, SCORING AND NEW WEIGHTING BASED ON BOTH WORKSHOP OUTPUTS
Area # Segmentation Criteria Scoring Guideline
New Weighting 1 - Low 2 - Medium 3 - High 4 – Very High
Enablement
1
Criticality to future innovations/ products/ services
No involvement and very little
potential
Some involvement and some potential
High involvement and high potential
Collaborative approach with
continuous involvement
27%
• Suppliers importance to SABIC to help develop new innovative products and/ or services
2 R&D expense as a % of revenue 0-1% 1-5% 5-10% 10% + 23%
• Supplier's latest FY R&D expense as a percentage of latest FY revenue
3 # of patents in the category for the alliance 0 1 to 2 3 to 4 5 + 20%
• # of patents related to the category SABIC is interested to create alliance in
4 # of certifications offered 0 1 to 2 3 to 4 5 + 13%
• # of certifications/ diplomas offered through the supplier related to alliance category
5 # of training/ knowledge academies 0 to 10 10 to 25 25 to 50 50 + 9%
• # of supplier training/ knowledge academies globally
6 # of partnerships with universities 0 1 to 2 3 to 4 5+ 8%
• # of academic partnerships supplier has with universities
Segment suppliers based on criteria
2
26
Classification: Internal Use
WE FINALISED OUR TIE BREAKER CRITERIA DEFINITION, SCORING AND WEIGHTING ON BOTH WORKSHOP OUTPUTS
Segment suppliers based on criteria
2
Area # Segmentation Criteria Scoring Guideline
Initial Weighting 1 - Low 2 - Medium 3 - High 4 – Very High
Tie breaker
1 Level of demand anticipated in next 3 years
Low demand, rare consumption
Seasonal demand, scattered
consumption
Consistent demand, regular
consumption
Very high demand, ongoing
consumption
4%
• Total level of anticipated future demand in the next 3 years
2 Latest supplier performance score To be determined To be determined To be determined To be determined 3%
• Latest FY supplier performance score
3 Supplier financial stability To be determined To be determined To be determined To be determined 2%
• Suppliers financial health as of the latest FY
4 # years of experience with SABIC <10 years 10 - 15 years 15 - 17 years >17 years 1%
• # of years supplier has been in business with SABIC
27
Classification: Internal Use
WE THEN TRANSLATED THE CRITERIA INTO A SURVEY IN ORDER TO COLLECT DATA AND GAUGE INTEREST IN ALLIANCES
Sample of questions asked externally (non-exhaustive):
1
2
What % of revenue does SABIC represent to your company?
3
4
What is SABIC’s rank in your top customers list at a company level?
5
What was your R&D expense as a % of revenue of the past 3 fiscal year?
6
What are the patents you have filed in the last 3 years?
7
Would you be interested in co-developing new technology with SABIC?
How many training/ knowledge academies do you have globally?
What are the top 3 opportunities you would prioritize to jointly solve with SABIC?
1
2
3
What is the supplier’s latest FY saudization rate?
4
What is your overall perception of this supplier?
How critical is the supplier to our future innovations/products/services?
What are the top 3 challenges you would prioritize to jointly solve with SABIC?
Sample of questions asked internally (non-exhaustive):
39 Total questions
70+ Total responses1
Segment suppliers based on criteria
2
117 suppliers replied with incomplete information; assumptions/ research was done to fill incomplete responses
28
Classification: Internal Use
1Represents 21 shortlisted suppliers who completed the survey 2SABIC R&D expense as of Y’17 was < 1%
THE INSIGHTS FROM THE SURVEY CONDUCTED REVEALED THE KEY OPPORTUNITIES AND CHALLENGES FOR ALLIANCES1
According to the survey, SABIC represents… The top opportunities for alliances
The top challenges for alliances
According to the survey, suppliers…
…have 200+ training academies globally
…offer 500+ certifications
…have filed 25+ patents in the past 3 years
…spend on average 3% of revenue on R&D2
Digitalization/ Internet of Things
Sustainability
Process optimization
Localization
Safety
Unclear communication
Lack of momentum for initiatives
Inefficient payment processing
Local resource capability
Administrative burdens
1
2
3
4
5
1
2
3
4
5
22%
22%
36%
10%
10%
40 to 80% of supplier’s business
40% of supplier’s business
<20% of supplier’s business
80% of supplier’s business
20 to 40% of supplier’s business
Petrochemical business
Segment suppliers based on criteria
2
29
Classification: Internal Use
IN PARALLEL, WE ALSO REVIEWED SUPPLIER IMPACT ON CORE STRATEGIC BUSINESS UNITS FOR FURTHER INSIGHTS
E & 3Ps
ETP
OLEFINS
OXYGENATES
PEPPMETALS
FCA FI & NB
GLYCOLS & GASES NITROGEN
# of SBUs impacted
Supplier # of SBUs impacted
Supplier # of SBUs impacted
Supplier # of SBUs impacted
Supplier
8
1
1
1
2
1
5
1
6
6
6
5
7
5
8
5
2
2
2
1
4
8
1
8
3
7
3
SABIC core SBUs
Segment suppliers based on criteria
2
Utilities
30
Classification: Internal Use
SHORTLISTED SUPPLIER TO SBU MAPPING DETAILS (1/2) Segment suppliers based on criteria
Supplier Products/ services (top 5 by spend) SBUs
ABB
• Power sources • Electrical equipment maintenance or repair • Industrial electric power distribution • Circuit protection devices and accessories • Power supply units
8
Alfa Laval
• Heating system maintenance and repair service • Gaskets • Cleaning Equipment and Supplies • Cleaning and janitorial services • Filters
1
Asco 1
Burckhardt
• Compressor kits • Completion tools and equipment • Machining and processing services • Pumps or compressors manufacture services • Rod
2
Caterpillar 1
Coperion
• Thrust bearings • Conveyor screw • Plate • Bag filters • Barrels
5
Danieli
• Rollers • Assembly fixtures • Foundry molds • Miscellaneous hardware • Hoses
1
Eagle Burgmann
• Seal mechanical • Industrial process machinery and equipment and supplies • Compressor kits • Industrial Production and Manufacturing Services • Seal kits
1
Supplier Products/ services (top 5 by spend) SBUs
Elliott
• Pumps or compressors manufacture services • Conventional pumping services • Joint sealing services • Seals
1
Emerson
• Control valves • Relief valves • Valve parts or accessories • Valve kits • Nozzles
6
Endress + Hauser
• Environmental management • Liquid and gas flow measuring and observing instruments • Level sensors or transmitters • Flowmeters • Detectors
6
Flowserve
• Seal mechanical • Industrial process machinery and equipment and supplies • Machining equipment rebuild and refurbishment service • Valve actuators • Valve kits
5
GE 7
Hitachi
• Manufacturing equipment maintenance and repair services • Pumping station maintenance or management services • Grinding services • Bushings • Balance equipment
5
Honeywell
• Software maintenance and support • Industry specific software maintenance • Electrical and electronic engineering • System and system component administration services • Electronic Components and Supplies
8
Kobelco 5
2 SABIC to complete
missing items
31
Classification: Internal Use
SHORTLISTED SUPPLIER TO SBU MAPPING DETAILS (2/2) Segment suppliers based on criteria
Supplier Products/ services (top 5 by spend) SBUs
Koch 2
Kubota
• Tubes tubing and tube fittings • Coil • Structural products • Control valves • Assembly fixtures
2
Linde
• Chromatographic measuring instruments and accessories • Heat exchangers • Valve parts or accessories • Miscellaneous hardware • Butterfly lug pattern valves
2
Midrex
• Catalysts • Hardware and fittings • Foundry bellows • Ball valves • Oil and gas exploration services
1
Mitsubishi
• Rotors • Seals • Power sources • Heating equipment and parts and accessories • Miscellaneous hardware
4
Mollers 8
Schmidt
• Coil • Tubes tubing and tube fittings • Boilers • Pipe bends • Assembly fixtures
1
Siemens
• Power sources • Roller bearings • Seals • Electrical equipment maintenance or repair • Electrical system services
8
Supplier Products/ services (top 5 by spend) SBUs
Sumitomo 3
Yokogawa
• Software maintenance and support • Computerized controls installation service • Industry specific software maintenance • System and system component administration services • Network planning services
7
York
• Oils • Heat exchangers • Cooling or refrigeration services • Pumps or compressors manufacture services • Seals
3
2 SABIC to complete
missing items
32
Classification: Internal Use
ONCE DATA WAS COLLECTED AND ANALYSIS WAS COMPLETED, WE THEN WERE READY TO SEGMENT THE 38 SUPPLIERS
Potential strategic alliance
candidates
5-10
•Potential suppliers for strategic alliance will then be identified following the matrix assessment
•The 2 main areas assessed are: − Efficiency − Enablement
Segmentation tool1Segmentation criteriaIII IV
Relevant suppliers for
strategic alliance1
38
Criteria examples - Alternative sources - % revenue to supplier - Production losses - # of critical
equipment - R&D expense
Matrix assessmentV
Enablement
E ff
ic ie
n c
y
Alliance zone
•A segmentation tool will plot 38 suppliers against a 2D matrix representing efficiency vs enablement
Segment suppliers based on criteria
2
33
Classification: Internal Use
WE LEVERAGED OUR SUPPLIER SEGMENTATION TOOL IN ORDER TO PLOT THE 38 SUPPLIERS AGAINST OUR MATRIX
Supplier Segmentation matrix
The final output of suppliers mapped against a pre-defined, weighted criteria
Supplier Segmentation tool
The excel model that was developed to calculate supplier scoring based on the agreed criteria
Segment suppliers based on criteria
2
34
Classification: Internal Use
THE SEGMENTATION TOOL SCORES EACH SUPPLIER AGAINST THE EFFICIENCY AND ENABLEMENT CRITERIA
Weights may vary depending on
corresponding criteria and is adjustable in the
model
6 segmentation criteria were
categorized under enablement
8 segmentation criteria were
categorized under efficiency
Supplier name
Efficiency criteria
Enablement criteria
Weightage
Segment suppliers based on criteria
2
35
Classification: Internal Use
OUR FINAL SUPPLIER SEGMENTATION OUTPUT SHOWS 8 POTENTIAL ALLIANCE CANDIDATES
E n
a b
le m
e n
t (i
n c
lu d
e s
p e
o p
le a
n d
t e
c h
n o
lo g
y )
YORK
SIEMENS
SAUDI VALVES
MANOIR
JOHN CRANE
Efficiency (includes operations and finance)
SCHMIDT (1FA1)
SUMITOMO KUBOTA
HONEYWELL
TOMOE
THYSSENKRUPP
MOLLERS
MIDREX
SCHNEIDER
LINDE
YOKOGAWA
KOCH GLTSCH
KOBE STEEL
MITSUBISHI
ENDRESS AND HAUSER
ERICSSON
INMA STEEL
ELLIOTT
GHI
COPERION (2FA1)
BURGMANN
ASCO
FLOWSERVE
HITACHI BURCKHARDT
BORSIG
DANIELI (1FA1)
ALFA LAVAL
BILFAL
GE
EMERSON
CATERPILLAR
ABB (1FA1)
Potential strategic alliance candidates
Critical suppliers
Essential suppliers
Segment suppliers based on criteria
2
Local presence Focus area
36
SECTION 5
STEP 3 - IDENTIFY POTENTIAL ALLIANCE
CANDIDATES
NEXT STEPS
37
Classification: Internal Use
IN ORDER TO SELECT THE ALLIANCES, A DEEP DIVE ANALYSIS MUST BE CONDUCTED ACROSS 4 BROAD AREAS
Identify potential alliance candidate
3
Potential strategic alliance
candidates
5-10
• Detailed customer profile
• Root cause incident analysis
• Historical unit cost analysis
• Commodity analysis
• Supplier performance
• Reliability analysis
• SABIC people technical gap analysis
• Supplier training program assessment
• Supplier academic partnership strategic fit
• Research on supplier innovation capability
• Patent analysis
• Supplier strategy (e.g. focus on digital?)
Supplier deep dive analysis
Non exhaustive
Finance Operations
TechnologyPeople
38
Classification: Internal Use
WHEN ASSESSING POTENTIAL ALLIANCE CANDIDATES, SABIC MUST UNDERSTAND WHAT SUPPLIERS MAY ASK FOR IN RETURN
Supplier benefits
Access to SABIC training academy to develop the workforce and build employees’ knowledge
Quicker and efficient payment processing times
Preference given to suppliers in SABIC technical and marketing events
Visibility of data/ future forecasts and industry insights from SABIC to streamline logistics and facilitate production planning
Non exhaustive
PR rights given to supplier to mention their strategic alliance with SABIC to other customers
Exclusivity on some commodities if the supplier is within 10% of the lowest price
Identify potential alliance candidate
3
Access to SABIC technology / patents to collaborate on innovative solutions
Financial
Technology & innovation Knowledge transfer
Collaboration
Regular participation of SABIC leaders at supplier trade shows Building competency through engineers’
rotation programmes
Access to SABIC Home of Innovation and preference for launching new technologies
Utilise SABIC Local Content support structure for ease of doing business in KSA
Co-investment / co-piloting opportunities for new innovative solutions
Deep level engagement between executive teams and long term business commitment
Provide opportunities to buy complete systems rather than stand along machinery
39
Classification: Internal Use
ADDITIONALLY, IT IS IMPORTANT TO ALWAYS KEEP IN MIND THE CHALLENGES WITH ALLIANCES AND HOW TO MITIGATE…
Challenges Mitigation measures
Poorly defined business objectives Every entity is looking for different objectives which creates a mismatch between both cultures and working strategies
Pre-alliance meetings Identify the results that will cause the alliance to be most beneficial for your business
Weak launch planning Failure to prepare proper start of alliance
Proper planning Prepare ahead of time all required documents for the alliance depicting risk & benefits sharing, roles, meeting frequency
Limited Executive support Limited executive support once the deal has been prepared
Documented support Document the elements provided by each party, and ensure leadership involvement in role definition
Poor governance structure Ill-conceived and minimally resourced governance structure and set of coordinating mechanisms
Well defined structure Define the structure and operating issues that need to be addressed to achieve the pre-agreed alliance benefits
Misaligned supplier selection Supplier(s) selected may not be aligned with SABIC’s strategic alliance objectives
Thorough review and of supplier objectives Conduct an assessment of the suppliers vision and goals to determine prior to the strategic alliance if they have aligned objectives
Identify potential alliance candidate
3
40
Classification: Internal Use
…INCLUDING POST-ALLIANCE RISKS
Post-alliance risks Mitigation measures
Culture clash Difficulty to break the typical adversarial mentality and understand one another culture
Pre-alliance meetings Meet with management to align on how to integrate two different cultures, and highlight importance of alliance
Lack of management focus Leaders becoming distracted by other key issues
Management focus Hold regular meetings to keep track of alliance KPIs
Integration failure Failure of building better relationships (pessimism) across the organizations
Vertical integration awareness Hold workshops with all workforce levels to shed the light on the importance and benefits of a successful alliance
Lack of agility Inefficient or bureaucratic processes work against collaborative behaviors
Preferential treatment Agree on exclusive treatment to ease transaction processes and other business activities
Lack of performance monitoring Inadequate understanding of how performance will be evaluated and managed
Proper performance management Hold regular executive reviews and resolve performance issues linked to the alliance KPIs
Identify potential alliance candidate
3
41
Classification: Internal Use
SABIC MUST FOLLOW BEST PRACTICES IN SELECTING AND FORMING ALLIANCES WITH SELECTED SUPPLIERS
Rigorous partner selection
Ensure a clear scope of work, cross- functional reviews of suppliers, and
honest supplier self-assessment
Shared strategy and objectives
Ensure strong alignment of goals and approach, with a clear value proposition for all partners
Right contracting models
Match contract model with project, market conditions, and internal
competencies
Appropriate risk allocation
Apply only appropriate risk to contractors to create win-wins
Transparency in collaboration
Increase transparency toward partners and involve them early in projects;
communicate widely
Relentless focus on governance
Develop formal governance structures to ensure efficient and effective
delivery
Strong alliance leadership
Ensure that leaders are problem solvers, collaborative, well connected
and able to deal with ambiguity
Deep integration
Integrate technical delivery approach, locations, and people development; make building relationship a priority
Value-based decision making
Identify value opportunities early and consistently make project decisions on
the basis of value
Robust performance management
Develop KPIs linked to alliance benefits; hold regular executive reviews and
resolve performance issues
Partner selection and contracting Streamlined operating model for the alliance
Identify potential alliance candidate
3
42
SECTION 6
STEP 4 - APPROACHING ALLIANCE
CANDIDATES
NEXT STEPS
43
Classification: Internal Use
WE HAVE CONDUCTED STEPS 1-3 TO DATE, HOWEVER IN ORDER TO EXECUTE AND MANAGE THE STRATEGIC ALLIANCES STEPS 4-6 MUST BE IMPLEMENTED
Planning and preparation • Define SABIC alliance
vision & objectives • Team formation • Benchmark studies • Data gathering
1
Segment suppliers based on criteria
• Selection criteria • Best practices • Segmentation tool
2
Identify potential alliance candidates
• Shortlist final suppliers • Segmentation matrix
3
Approach alliance candidates for buy-in
• Size opportunity • Acquire approval
4
Develop outline alliance with supplier
• Collaboration charter • KPIs • Performance
management
5
Execute & manage the alliance
Sign-off by SABIC CEO
6 GPS
Manufacturing Manufacturing
E&PM E&PM
LC team LC team
Legal Legal
Suppliers
Obtain supplier buy-in
S ta
k e
h o
ld e
r E
n g
a g
e m
e n
t
Next StepsSteps completed
Res. & Tech.1 Research & Technology
1Research and Technology
44
Classification: Internal Use
SABIC MUST LEVERAGE A 4-STEP METHODOLOGY TO JOINTLY SIZE THE OPPORTUNITY FOR THE STRATEGIC ALLIANCE
Activities
Define ambition
level
1
Define alliance
objectives
2
Identify opportunities
and initiatives
3
Develop high level
business case
4
What is it that we want to strive for?
What do you want to reach?
What are the opportunities and initiatives we can undertake to
create value?
What is the ‘size of the prize’ for both of our organizations?
“Build the best product, cause no unnecessary harm, and innovate disruptive technological solutions in our industry”
1. Create value through operational improvements and technological innovations
2. Create a safe working environment
1. Reduce cost to SABIC by procuring materials in bulk based on SABIC future demand
2. Increase profit to supplier by assuring future business 3. Conduct joint safety training for all staff involved
1. Assess supplier TCO and identify areas for cost reduction 2. Forecast SABIC future 5-year demand requirements &
allocate business to supplier 3. Develop safety training curriculum using best practices
Illustrative
Approach alliance candidates for buy in
4
45
Classification: Internal Use
1Typical duration is based on benchmark data. Actual duration of alliances is dependent on the objectives and context of the alliance
STRATEGIC ALLIANCES VARY IN PURPOSE AND DURATION DEPENDING UPON AGREED OBJECTIVES
Non exhaustive
Alliances build knowledge across their employees through leveraging: training centres, certification bodies and academic partnerships
Purpose to improve technological know how through consolidated R&D centres, establish agreements on technology commercializing or joint product development
Taking advantage of existing marketing and distribution infrastructures to achieve wider reach across geographical borders to enhance sales output
Sharing sales forecasts and co-investing in production enhancement initiatives to achieve cost optimization to streamline logistics and reduce inventory costs
Cost and process optimization
Marketing, sales and services
Technology and innovation
Technical training and knowledge transfer
Approach alliance candidates for buy in
4
Typical duration1
3 + years
2 - 3 years
1 – 2 years
6 months - 1 year
46
Classification: Internal Use
WE DEVELOPED A STRATEGIC ALLIANCE TOOLKIT INCLUDING A PARTICIPATION LETTER AND KICK OFF DECK TEMPLATE
Introductory meeting template
SABIC could initiate a kick off meeting with the supplier to discuss their current relationship and the potential to develop an alliance
Supplier participation letter
Letter sent to the supplier when approaching the potential alliance to establish their interest in perusal
Approach alliance candidates for buy in
4
47
SECTION 7
STEP 5 & 6 - DEVELOP OUTLINE AND
EXECUTE ALLIANCE
NEXT STEPS
48
Classification: Internal Use
SABIC CAN USE VARIOUS TECHNIQUES TO INCENTIVIZE SUPPLIERS TO JOIN AN ALLIANCE
The contract will hold as a binding document between SABIC and the supplier
We will refer to the alliance charter as an additional clause in the contract
SABICSupplier
Alliance incentives Exclusivity
Sole source exclusivity
Long-term relationship
Increase contract length from 5 to 10 years
Preferential treatment
Preferential treatment during bidding process
Access to our data & knowledge
Access to our data and forecasts
Efficiency
Collaborate on improving operational efficiencies
1
2
Illustrative
Execute and manage
6 Outline alliance
5
49
Classification: Internal Use
SABIC’S TOOLKIT HAS MANY TOOLS WHICH CAN BE LEVERAGED THROUGHOUT THE ALLIANCE DURATION (1/2)
Strategic alliance health check questionnaire
Measure the overall health of the strategic alliance through a generic questionnaire with pre-established questions to complete periodically
Strategic alliance charter
The signed agreement between SABIC and the supplier to define governance, roles and responsibilities and KPIs etc.
6 Outline alliance
5 Execute and manage
50
Classification: Internal Use
SABIC’S TOOLKIT HAS MANY TOOLS WHICH CAN BE LEVERAGED THROUGHOUT THE ALLIANCE DURATION (2/2)
Strategic alliance process framework
An outline of the strategic alliances detailed processes based on best practice
Strategic alliance presentation templates
Templates provided for the executive, management and operational level reviews to manage and track the alliance
6 Outline alliance
5 Execute and manage
51
APPENDIX 1 – INTRODUCTION TO
STRATEGIC ALLIANCES
52
Classification: Internal Use
Strategic Alliance Potential Benefits
Economies of scale
Efficiency improvement
Access to new markets
Sharing knowledge & experience
Acquire skills
Quality and safety improvement
Cost optimization
Uniting forces
Co-product development
Innovation
Confronting competition
Sharing risk & benefits
SABIC Supplier
A strategic alliance is a long term, cooperative relationship designed to
leverage the strategic and operational capabilities of individual participating
companies to achieve significant benefits to each party.
INTRODUCTION TO STRATEGIC ALLIANCES
Mandate to use SABIC products
53
Classification: Internal Use
PROCUREMENT TRANSFORMATION JOURNEY
Transactional Focus on unite price, equal treatment
Category Management Focus on TCO, aggregated demand, quality, capabilities
SRM Key enabler
Strategic Alliance Focus on collaboration, mutual added value
V a
lu e
t o
t h
e
o rg
a n
iz a
ti o
n
High
Low
Where we are today
Procurement Transformation Journey (Acceleration Model)
54
Classification: Internal Use
THE EVOLUTION OF THE PROCUREMENT JOURNEY
Cost Out
SABIC
• Reliability improvement
• Efficiency • Technical support • Proactive risk
management • Capability building • Technology & data
sharing
55
Classification: Internal Use
THE KEY DIFFERENCES BETWEEN A STRATEGIC ALLIANCE, JV AND M&A
Agreement negotiation
Duration
Benefit & risk allocation
Governance
Culture
Strategic alignment
Alliance
Collaboration and co- creation
Unilateral planning Can’t shift gears easily – a lot must be
planned up front
M&A Key nuances between Alliances and
JVs/M&A
Agreements must be flexible
Upfront planning around the alliance
Upfront agreement on how risks and rewards will be shared
Need to collaborate in decision making
Recognize the inherent difference in cultures, embrace and adapt
Alliances must be reviewed regularly around specific milestones
Conflicting (buyer/seller) agendas
Infinite
Individual
One management team
One prevailing culture
Integrate acquisition
Flexibility due to same end game
Finite
Shared
Numerous management teams
Different cultures of partners
Regular review of alliance
Joint Venture
Co-creation/unilateral planning
Flexibility due to same end game
Finite/Infinite
Individual (new entity)
One management team
One prevailing culture
Integrate entity
Entity Each entity remains totally
independent One entity
Separate and independent entities
One entity (new subsidiary)
56
APPENDIX 2 – BENCHMARKING AND
CASE STUDY
57
Classification: Internal Use
Purpose and objectives Benefits and outcomes
CASE STUDY – DOW AND OSHA
Shared ideas to identify and prevent occupational hazards (regular participation in webinar and stakeholder forums)
Collaborated through frequent knowledge and experience sharing to develop innovative solutions (e.g. Ammonia refrigeration eTool)
Developed case studies to raise awareness (e.g. ergonomics and motor vehicle safety)
Realised process improvement and a significant drop in injury rates (e.g. 95% drop between 1995 and 2007 in the annual injury rate goal for contractors at Freeport)
Facilitated outreach events (e.g. H&S week)
To leverage collective expertise, enhance a culture of prevention and develop technological knowledge in:
Process safety management
Health management systems
Emergency preparedness
Employee wellness programs
The 7 year alliance between DOW and OSHA had two major goals:
1) Effective outreach and communication
2) Promoting national dialogue on health and safety
58
Classification: Internal Use
Source: Sourcing strategy report by D. Pyke, Strategic Alliance thesis by Anna Pellicelli, Alliance in the oil field report by J.Heidt, C. Austin, Richard Lewis
BP’s Andrew alliance
BP formed an alliance with 7 contractors.
• Achieved a project 20% under budget and 6 months ahead of schedule
CRINE Industry wide initiative
Several operators and contractors participated in this program
• Reduced costs (-40%)
Ford, GM and Daimler Benz
Aim to develop and standardize common transaction ($250b/year)
• New car model plan decreased from 40 to 15 months (-63%)
Amoco Southeast alliance
Amoco alliance with Schlumberger companies
• Reduced pumping costs from $253k to $200k (-20%)
• Reduced fracturing costs from $210k to $160k (-24%)
DuPont alliance
DuPont worked closely with a supplier of maintenance, repair, and operating
supplies.
• Cut inventory cost by $118M over 10 years
• Supplier saved $16M/year
Chrysler alliance
Chrysler alliance with its suppliers
• Saved over $2b from supplier generated ideas
John Deere’s alliance
Working with key suppliers
• Reduced cost (-25%) • Reduced cycle time from 32 to 2
days (-94%)
Vermilion 331 alliance
Alliance between 4 contractors
• Reduced drilling cost from 92$/ ft. to 79$/ ft. (-15%)
• Increased production from 6030 bbl of oil/ day to 7840 bbl of oil/ day
(+30%) • Increased drilling capacity of 592
ft./ day to 921 ft./ day (+56%) • Reduced time from 6.6 days/gravel
pack to 4.8 days/gravel pack
(-28%)
WE BENCHMARKED LEADING ORGANIZATIONS TO UNDERSTAND THE POTENTIAL BENEFITS FROM FORMING ALLIANCES (1/2)…
Non exhaustive
59
Classification: Internal Use
Source: Sourcing strategy report by D. Pyke, Strategic Alliance thesis by Anna Pellicelli, Alliance in the oil field report by J.Heidt, C. Austin, Richard Lewis
Confronting competition
• In the earth-mover sector, neither ClarkEquipment nor
Volvo had enough production volume (the former in the United States, the latter in Europe) to take on the global leaders Caterpillar and Komatsu.
• In the mid-80’s they decided to create an alliance called CLARK-VOLVO.
Access to new markets
• In mature segments, a company often wants to develop in a market segment where it is not present through an agreement with another company.
• Hence, an alliance was created between Daimler-Benz and
the Swiss microelectronics company SMH to create the SMART vehicle.
Access to technology
General Instruments, Microsoft, Intel. • In the “information gateway” alliance, General Electric
brought its experience and market share in converter boxes; Microsoft contributed its software and Intel its microprocessors.
Dividing risks
• For certain projects, risks of failure are high, and even higher when investments are elevated.
• CFM International. The alliance (50-50 joint venture) between General Electric and Snecma was made to plan,
develop and produce a new airplane propeller. • Over 10 years of R&D work and more than $2b dollars
were necessary to sell the first engine.
THEN, WE BENCHMARKED LEADING ORGANIZATIONS TO UNDERSTAND THE POTENTIAL BENEFITS FROM FORMING ALLIANCES (2/2)…
Non exhaustive
60
Classification: Internal Use
…AND THE BENEFITS CAN BE CATEGORIZED AS FOLLOWS
Non exhaustive
Intangible
Tangible1
Strategic alliance
Reduced inventory cost
Reduced unit price
Reduced production losses
~ 50%Reduced lead time
Increased productivity
Increased capacity
Hard
Hard
~ 25%
~ 30%
~ 50%
Confronting competition
Dividing risks
Access to technology
Access to new market
Soft
Soft
Soft
Soft
Soft benefits
Hard benefits
61
Classification: Internal Use
ALFA LAVAL APPLIES A 5 PHASE FRAMEWORK TO STRATEGIC ALLIANCES
Strategic Alliances Benchmark
ALFA LAVAL’s MISSION:
“To optimize the performance of customer’s processes. Time and time
again”
• Multinational company in the business of heat transferring, separation and fluid handling
• 9,500 employees worldwide
• Est. in 1883 with local presence in over 100 countries
• 70 service centers and 20 large production units
• Sales of 1,719 EUR mn and an operating margin of ~11%
5 PHASE APPRPOACH TO STRATEGIC ALLIANCES
4. ESTABLISH RELATIONSHIP
3. SCREENING 1. . OBJECTIVES &
STRATEGY 2. IDENTIFICATION
5. EVALUATE RELATIONSHIP
Determine the strategic need and overall purpose for a supplier alliance, the sought outcome and the team responsible for delivery
Identify potential partners, applying a set assessment criteria. Unfit candidates are eliminated at this stage
Interested suppliers go through further assessment to ensure requirements are met before pursuing a relationship
Clarify goals and expectations for the alliance in writing but not in a formal contract. Frequent meetings and top management alignment is critical at this stage
Review pre- defined perceived benefits to assess if the alliance has delivered the intended benefits and identify possible areas of failure
62
Classification: Internal Use
Strategic Alliances Benchmark
SETTING STRATEGIC ALLIANCE OBJECTIVES AND PURPOSE
Case Study: Nissen
• Alfa Laval sought a partnership to fill a gap in their product portfolio (air/oil coolers) where they lacked the internal competencies
• Aim to expand presence in the hydraulic market
1
Ultimate goal to expand product portfolio and become a leading suppliers in the hydraulic market
Case Study: Zorzini
• Extension of the transactional relationship with Alfa Laval who procure Zorzini’s manhole covers
• Sought a strategic alliance to achieve sufficient volumes with production efficiency
2
Widen product portfolio and sell more complete solutions, establishing themselves as the only provider
of Zorzini covers in certain markets
When considering a strategic partner, Alfa Laval sets
the following overarching objectives:
Commitment to maximize shared benefits and performance gains
1
Frequent and open flow of information to share knowledge and resources
2
Regular face-to-face interactions to maintain long lasting relationship
3
Solve common problems by seeking joint technological solutions
4
Reduce time to market through early product development
5
4. ESTABLISH RELATIONSHIP
3. SCREENING 1. . OBJECTIVES &
STRATEGY 2. IDENTIFICATION
5. EVALUATE RELATIONSHIP
63
Classification: Internal Use
Strategic Alliances Benchmark
PERCEIVED BENEFITS OF STRATEGIC ALLIANCES
Case Study: Nissen
• Significant projected rise in sales volume
• Knowledge sharing on D&D and process improvement
• Leveraging joint capabilities and supplier network
1
Achieve joint product and technology development through Leveraging Nissen’s internal competencies
and commodity customization
Case Study: Zorzini
• Logistics cost reduction and reduced lead times through the sales network and distribution structure
• Quality and process improvement pressures applied by Alfa Laval to drive innovation
2
Close relationship sought to enhance product development efficiency, streamline logistics and
achieve greater conformance to high quality standards
Product Development
• Increased development efficiency • Higher production efficiency. • Reduction in risk and ‘cost creep’
Logistics cost reduction
• Increasing information sharing (e.g. access to real sales data) suppliers can plan production accurately
Access to new technology
• Close relations creates foundations for long term competitive advantage
Quality Improvement
• Regular reviews of design and tolerances
• Improvement of process capabilities and conformance to standards
The main purpose for establishing a strategic
alliance is rooted in the following 4 potential benefits:
4. ESTABLISH RELATIONSHIP
3. SCREENING 1. . OBJECTIVES &
STRATEGY 2. IDENTIFICATION
5. EVALUATE RELATIONSHIP
64
Classification: Internal Use
Strategic Alliances Benchmark
IDENTIFYING AND SCREENING POTENTIAL PARTNERS
Cost
Delivery
Reliability
Financial stability
Organisational fit
Technological capabilities
Quality
S u
p p
li e
r S
e le
c ti
o n
C ri
te ri
a
Case Study: Nissen
• Traditional measures of supplier performance applied to selected firms
• Further Assessment based on the overall situation, firm healthiness and risk of market conflict
1
Evaluation based on overall situation as well as traditional supplier selection methods, excluding an
analysis of organisational fit
Case Study: Zorzini
• Development of existing transactional relationship to a strategic alliance due to enhance cost efficiencies and production efficiency
• No formal assessment process was undertaken
2
Zorzini’s commodity classified as a ‘strategic product’ in the matrix, stimulating the development of a
strategic partnership
To ensure that a strategic alliance is the most suitable
fit, Alfa Laval conduct an assessment including:
- Standard
purchasing
selection
criteria
- Additional
selection
criteria for
strategic
alliances
1. Commodity selection matrix: (mapping products on a matrix in terms of supplier risk and product importance)
2. Supplier selection criteria:
4. ESTABLISH RELATIONSHIP
3. SCREENING 1. . OBJECTIVES &
STRATEGY 2. IDENTIFICATION
5. EVALUATE RELATIONSHIP
65
Classification: Internal Use
Strategic Alliances Benchmark
ESTABLISHING STRATEGIC RELATIONSHIPS
Case Study: Nissen
• Cross functional team formed with inter-firm representation and top management participation
• Established a general contract (design ownership, prices, market activities etc.)
1
There was a notable lack of participation of the Global procurement team in coordination activities
Case Study: Zorzini
• Established a 3 year contract with guidelines and to regulate major issues e.g. division of markets
• Portfolio management team established to manage and track performance
2
Structured contract signed and oversight team established, however no top management interface
and absence of a cross functional team
Achieve central coordination of the relationship with purchasing representatives kept in the loop
Ensure coordination and alignment of top management agendas through regular face to face interactions
Success factors to minimize risk of failure include: commitment, trust and shared reward
Establish clarity through a non- formalized document that includes details of the alliance (e.g. IP rights)
Clarify understanding through written document
Establish success factors and risk of failure
Establish top management alignment meetings
Deploy a cross-functional team
4. ESTABLISH RELATIONSHIP
3. SCREENING 1. . OBJECTIVES &
STRATEGY 2. IDENTIFICATION
5. EVALUATE RELATIONSHIP
66
Classification: Internal Use
Strategic Alliances Benchmark
EVALUATING STRATEGIC ALLIANCES
• Considerable interaction and coordination - establishment of a extensive cross functional team with top management involvement and interaction during product development
• Information shared freely – access to all information in a fair and open manner throughout the alliance
What Went Well
• Lack of organisational fit – Nissen was not cost-focused and there was a lack of alignment in ways of working
• Lack of reward sharing – Alfa Laval demanded high profit margins and a greater share than Nissen
• Cost calculations impossible to validate - cost creep through design and construction changes and lack of alignment
• Lack of trust and perceived commitment - Alfa Laval’s intent for product ownership and risk of moving to a lower cost supplier
What Went Wrong
6-12 months after the alliance became operational an evaluation is undertaken to assess overall performance and future prospects.
Evaluations are centered around the extent to which benefits and objectives have been achieved through four major KPIs:
Delivery on time1
Product quality2
Lead time3
Cost reduction4
• Close collaboration – open and wiliness to share information (e.g. access to sales forecasts) in addition to sharing rewards
• Conformance to high standards – extra quality controls of products secures premium quality
• Commitment to a long term relationship – regular investment in tooling and closing all in-house production
• Interrupted production - high demands placed on lead times became difficult to manage effectively
• High inventory costs – frequent stock-keeping units for urgent requests
N is
s e
n Z
o rz
in i
N is
s e
n Z
o rz
in i
4. ESTABLISH RELATIONSHIP
3. SCREENING 1. . OBJECTIVES &
STRATEGY 2. IDENTIFICATION
5. EVALUATE RELATIONSHIP
67
APPENDIX 3 – STRATEGIC ALLIANCES
DATA ANALYSIS
68
Classification: Internal Use
SUPPLIER SPEND AND INCIDENT COSTS1
Shortlisted share of SABIC total materials and services spend (5 years)
382 manufacturers spend (SAR, 5 years)
Total spend (SAR, 5 years)
9.3 bn
31.8 bn
Shortlisted share of SABIC total incident losses (5 years)
38 manufacturers cost (SAR, 5 years)
Total cost (SAR, 5 years)
530 M
3.1 bn
1Data only includes direct spend (e.g. EPC related spend is not included) and excludes logistics, medical, chemical and IT (~44.8 bn) 238 manufacturer represent 7.8% of our filtered suppliers (excluding logistics, medical etc.) but represent <1% of our total 5000 + suppliers
< 1% of total
suppliers
69
Classification: Internal Use
SHORTLISTED SUPPLIER STATISTICS1
Top 5 shortlisted manufacturer spend (SAR mn, 5 years)
Top 5 shortlisted manufacturer incidents cost (SAR mn, 5 years)
Top 5 shortlisted manufacturer inventory cost (SAR mn, today)
1Data only includes direct spend (e.g. EPC related spend is not included) and excludes logistics, medical, chemical and IT
70
Classification: Internal Use
CATEGORY LOSSES STATISTICS1
Top 5 categories total production and maintenance losses (SAR mn, 5 years)
% of equipment causing losses per category (Top 5, 5 years)
Average losses per equipment category (SAR k, 5 years)
1Data only includes direct spend (e.g. EPC related spend is not included) and excludes logistics, medical, chemical and IT
71
APPENDIX 4 – SEGMENTATION
TOOLKIT
72
Classification: Internal Use
Icon Description
Internal healthcare questionnaire
External healthcare questionnaire
Segmentation tool
Alliance charter
Participation letter
Kick-off deck
Executive alignment meeting template
Business alignment meeting template
Operational review meeting template
ALLIANCE TOOLKIT
73
Classification: Internal Use
EXAMPLE OUTPUT OF SOME OF THE TOOLS
Segmentation tool to identify and plot the final 5 to 10 strategic suppliers
Questionnaire to assess the on-going health of the alliance
End-to-end process framework on how to implement strategic alliance from start to finish
Alliance charter and Participation letter detailing the characteristics of the alliance, governance structure, KPIs, etc.
74
APPENDIX 5 – STRATEGIC ALLIANCE
PROCESS FRAMEWORK
75
Classification: Internal Use
THE STRATEGIC ALLIANCE FRAMEWORK SET OUT IN THIS PROCESS OUTLINES THE LEADING PRACTICE PROCESSES TO BE DEPLOYED FOR SABIC
• High level process map • Process scope & description • Process starting point
• Level 2 process map • Data inputs
• Process step • Description • Inputs and outputs of the process
• Relevant tools & templates1
• Process triggers for use of tools2
Strategic Alliance Process Framework
Strategic Alliance Tools
Process Scope
Detailed Process Map
Process Description
Tools & Templates
1Tools are numbered based upon the folder structure for the toolkit
76
Classification: Internal Use
THE FOLLOWING PROCESS FRAMEWORK HANDOUT FORMAT WILL GUIDE THE WAY WHICH SABIC UTILIZES THE ALLIANCE METHODOLOGIES AND TOOLS
Process Model Decomposition
Level 1 Level 2
1. Supplier Segmentation
Prepare for segmentation
1.1
Define key capabilities
1.2
Segment supply base
1.3
Select potential alliance
suppliers
1.4
2. Strategic Alliance Management
Approach alliance
candidates
2.1
Develop outline alliance
2.2
Execute & manage alliance
2.3
77
Classification: Internal Use
PROCESS STRUCTURE: SUPPLIER SEGMENTATION
Supplier
Segmentation
1
Strategic Alliance Management
2
Process Decomposition: Supplier segmentation
Level 1 Level 2
1. Supplier Segmentation
Prepare for segmentation
1.1
Define key capabilities
1.2
Segment supply base
1.3
Select potential alliance
suppliers
1.4
Scope description and guidelines
Scope: • The scope of segmenting the supply base entails the standard segmentation process activities towards selection of
the potential Strategic Alliance suppliers. The scope of this process applies to SABIC suppliers to properly assign each supplier to the relevant segment (strategic, critical, operational, or transactional) in order to focus alliance efforts.
Guidelines: • The segmentation exercise is focused on existing suppliers only. • Suppliers which are deemed strategic to SABIC may not be applicable for strategic alliance if the supplier does not
view SABIC as an attractive customer and / or SABIC does not represent a high value of spend to the supplier. • The strategic supplier segment should generally not exceed 5-10 suppliers. • Supplier segmentation should be repeated on an annual basis.
78
Classification: Internal Use
PROCESS FLOW: SUPPLIER SEGMENTATION
Supplier
Segmentation
1
Strategic Alliance Management
2
Process Decomposition: Supplier segmentation
Level 1 Level 2
1. Supplier Segmentation
Prepare for segmentation
1.1
Define key capabilities
1.2
Segment supply base
1.3
Select potential alliance
suppliers
1.4
1.1 Prepare for segmentation
Need for segmentation
Define strategic vision & direction
for strategic alliances
Identify supplier ecosystem
Segmentation process
prepared
1.1.1 1.1.2
Establish segmentation team
1.1.3
79
Classification: Internal Use
PROCESS FLOW: SUPPLIER SEGMENTATION
Supplier
Segmentation
1
Strategic Alliance Management
2
ID Process activity Description Input Output
1.1 Prepare for segmentation
1.1.1 Define strategic vision & direction for strategic alliances
Define SABIC strategic vision & direction in order to understand where SABIC wants to be over the next 2-3 years.
• SABIC strategic plans • SABIC business
objectives
• Clear vision and objectives for SABIC
1.1.2 Identify supplier eco- system
Establish the long list of current active suppliers to perform the segmentation activity on.
• Supplier raw data
• Long list of current, active suppliers
1.1.3 Establish segmentation team
The team members that will be involved need to be contacted and informed (from Procurement and the business).
• List of potential team members across several functions
• Team selected
80
Classification: Internal Use
PROCESS FLOW: SUPPLIER SEGMENTATION
Supplier
Segmentation
1
Strategic Alliance Management
2
Process Decomposition: Supplier segmentation
Level 1 Level 2
1. Supplier Segmentation
Prepare for segmentation
1.1
Define key capabilities
1.2
Segment supply base
1.3
Select potential alliance
suppliers
1.4
1.2 Define key capabilities
Segmentation process
prepared
Define strategic alliance
objectives
Brainstorm potential alliance
initiatives
Key capabilities determined
Define capabilities to offer alliance
1.2.1 1.2.2 1.2.3
81
Classification: Internal Use
PROCESS FLOW: SUPPLIER SEGMENTATION
Supplier
Segmentation
1
Strategic Alliance Management
2
ID Process activity Description Input Output
1.2 Define key capabilities
1.2.1 Define strategic
alliance objectives
Once segmentation team is established and SABIC’s vision is understood, strategic alliance objectives should formally be defined
• SABIC vision • Strategic
alliance objectives
1.2.2 Brainstorm potential alliance initiatives
Based upon strategic alliance objectives, the team should brainstorm potential initiatives which could help achieve the objectives defined; these initiatives are only draft until further discussions happen with shortlisted suppliers
• Strategic alliance objectives
• Potential initiatives
1.2.3 Define capabilities to offer alliance
In addition, SABIC should discuss and agree capabilities/ value proposition which it can ‘bring to the table’ for any potential alliance which is formed
• Strategic alliance objectives
• Capabilities/ value proposition for alliance
82
Classification: Internal Use
PROCESS FLOW: SUPPLIER SEGMENTATION
Supplier
Segmentation
1
Strategic Alliance Management
2
People OperationsFocus areas FinanceTechnology
Improve people knowledge and skills
Improve productivity
Share manpower and people resource
Increase efficiency
Reduce production losses and disruptions
Reduce safety incidents
Strategic objectives
Reduce unit cost
Reduce inventory cost
Reduce maintenance cost
Improve business forecasts
Access to new technologies
New innovative solutions
Data sharing
Joint strategic planning
Access to training centers
Access to expanded network of people regionally and globally
Joint process redesign
Joint specification analysis
Joint risk management
Preferred access to capacity
Capabilities & potential initiatives
Joint cost modelling
Perform collaborative forecasting, planning and risk management
Visibility in the supply chain
Joint product design
Gain sharing
New technology access
Preferred access to resources
By using a top down approach, SABIC must first define the strategic objectives which trickles down into existing capabilities and potential initiatives to target
when scanning the supply base for strategic alliances.
Enablement Efficiency
83
Classification: Internal Use
PROCESS FLOW: SUPPLIER SEGMENTATION
Supplier
Segmentation
1
Strategic Alliance Management
2
Process Decomposition: Supplier segmentation
Level 1 Level 2
1. Supplier Segmentation
Prepare for segmentation
1.1
Define key capabilities
1.2
Segment supply base
1.3
Select potential alliance
suppliers
1.4
Key capabilities determined
Define segmentation
criteria & scoring
Define segmentation
weighting
Segmented supply base
Segment supply base
1.3.1 1.3.2 1.3.4
Gather relevant information and
data
1.3.3
84
Classification: Internal Use
PROCESS FLOW: SUPPLIER SEGMENTATION
Supplier
Segmentation
1
Strategic Alliance Management
2
ID Process activity Description Input Output
1.3 Segment supply base
1.3.1 Define segmentation criteria & scoring
Review existing/ best practice segmentation criteria and choose the relevant ones for SABIC. Segmentation criteria may also be created if there is a pressing issue which needs to be taken into account for the segmentation exercise (e.g. maintenance costs rising over past 2 years).
• Key capabilities • What is important to
SABIC • Strategic alliance
objectives
• Segmentation criteria & scoring
1.3.2 Define segmentation weighting
Assign to each criteria a weighting so that on each axis the sum is 100%. The weightings for each segmentation criteria will depend upon what is important to SABIC. Remember that if the segmentation results do not look reasonable, weightings can be adjusted to better reflect SABIC’s business.
• Segmentation criteria • Strategic alliance
objectives
• Criteria weightings defined
1.3.3 Gather relevant information and data
Gather relevant data and information internally & externally to perform execution of segmentation.
• Spend data • Market information • Market research
• Relevant info • Data collected
1.3.4 Segment supply base
Segment your supply base using the segmentation tool and assigning the correct scores based upon the scoring criteria defined in the instructions tab of the tool.
• Defined weightings • Relevant stakeholder
input
• Segmented supply base
Relevant tools & templates for process step:
Ref 1.3.4 Segmentation tool
85
Classification: Internal Use
PROCESS FLOW: SUPPLIER SEGMENTATION
Supplier
Segmentation
1
Strategic Alliance Management
2
Process Decomposition: Supplier segmentation
Level 1 Level 2
1. Supplier Segmentation
Prepare for segmentation
1.1
Define key capabilities
1.2
Segment supply base
1.3
Select potential alliance
suppliers
1.4
Segmented supply base
Discuss & confirm
outcomes with business
Select potential candidate(s)
Potential candidate(s)
EscalateGo to step 1.3.1
Yes
No
Agree on outcome?
Additional criteria
required?1
NoYes
Assign Category Manager
1.4.1 1.4.2 1.4.3
1.4.5 No
86
Classification: Internal Use
PROCESS FLOW: SUPPLIER SEGMENTATION
Supplier
Segmentation
1
Strategic Alliance Management
2
ID Process activity Description Input Output
1.4 Select potential Strategic Alliance suppliers
1.4.1 Discuss and confirm outcomes with business
Discuss and confirm the segmentation outcomes with involved stakeholders and other relevant business stakeholders
• Segmented supply base
• Segmentation outcomes confirmed
1.4.2 Select potential candidates
If the outcomes of the segmentation process are confirmed, the potential candidate(s) for Strategic Alliance can be selected
• Confirmed segmentation outcomes
• Selected candidate(s)
1.4.3 Assign Category Manager
After selection of the potential candidate(s), the relevant category manager and stakeholder from the business need to discuss how to manage the alliance with the business taking a lead on owning the alliance with the supplier
• Selected strategic alliance suppliers
• Assigned strategic alliance team
1.4.4 Review additional business segment criteria
If the outcomes of the segmentation process are not confirmed, discuss whether additional segmentation criteria need to be added to the current set of criteria or if the weightings need to be adjusted
• Segmentation outcomes not confirmed
• Decision to add criteria or adjust weights
1.4.5 Escalate If needed, critical issues and concerns are escalated to business leadership
• Decision to escalate • Resolved
issue
87
Classification: Internal Use
PROCESS STRUCTURE: STRATEGIC ALLIANCE MANAGEMENT
Supplier
Segmentation
1
Strategic Alliance Management
2
Process Decomposition: Strategic alliance management
Level 1 Level 2
Scope description and guidelines
Scope: • This process covers the formal way of how to assess, develop, and execute a strategic alliance with the selected
suppliers based upon the segmentation exercise.
Guidelines: • One critical success factor of alliance management is to have a balanced team in place that has a mandate with
representation from the business and procurement. • Key supplier data and information is critical to understand the existing alliance with the supplier and their perception
of SABIC. • Commitment and involvement from SABIC procurement and the business is essential to a successful alliance. • Ensure that all steps are properly followed to ensure proper decision making and that the supplier team is well
prepared before engaging the concerning supplier. • SABIC must be open to receiving honest and constructive feedback from the supplier. This will strengthen the trust
between SABIC and the supplier and also ensure the voice of the supplier is heard.
2. Strategic Alliance Management
Approach alliance
candidates
2.1
Develop outline alliance
2.2
Execute & manage alliance
2.3
88
Classification: Internal Use
PROCESS FLOW: STRATEGIC ALLIANCE MANAGEMENT
Supplier
Segmentation
1
Strategic Alliance Management
2
Process Decomposition: Strategic alliance management
Level 1 Level 2
2.1 Approach alliance candidates
Potential Strategic
Alliance supplier
Establish alliance team and engage
stakeholders
Engage supplier and asses
alliance
Defined alliance approach
2.1.1 2.1.2 2.1.3
2. Strategic Alliance Management
Approach alliance
candidates
2.1
Develop outline alliance
2.2
Execute & manage alliance
2.3
Define supplier alliance approach
89
Classification: Internal Use
PROCESS FLOW: STRATEGIC ALLIANCE MANAGEMENT
Ref 2.1.3 Participation letter
Supplier
Segmentation
1
Strategic Alliance Management
2
ID Process activity Description Input Output
2.1 Approach alliance candidates
2.1.1 Establish alliance team & engage stakeholders
Relevant business representatives and procurement stakeholders are selected, roles & responsibilities are defined, and a stakeholder analysis is performed to define involvement.
• Relevant stakeholders
• Roles & responsibilities
• Stakeholder matrix
• Established alliance team with defined roles and levels of involvement
2.1.2 Define supplier alliance approach
Define what value the supplier currently brings to SABIC and what additional value the supplier has to offer. Define business objectives to address any deficiencies in the quality of supply and a plan to create additional value (e.g. monthly quality meetings).
• Business objectives • Ongoing areas of
concern • Plans to engage
supplier
• Defined objectives and plan to engage supplier and create additional value
2.1.3 Engage supplier & assess alliance
First, send the participation letter to ensure supplier is interested in engaging in a potential alliance. Once confirmed, contact the supplier and set up an initial kick-off meeting to discuss a potential strategic alliance and the value it can create for both SABIC and the supplier. Ensure to discuss the results of the questionnaire as well if the alliance has been ongoing1. Introduce the alliance charter for initial discussion and alignment.
• Kick-off meeting • Questionnaire
results (if available) • Alliance charter
• Supplier kick-off meeting conducted and alliance charter / questionnaire socialized
Ref 2.1.3 Kick-off deck
Ref 2.1.3 Health check questionnaire
Relevant tools & templates for process step:
90
Classification: Internal Use
PROCESS FLOW: STRATEGIC ALLIANCE MANAGEMENT
Supplier
Segmentation
1
Strategic Alliance Management
2
Process Decomposition: Strategic alliance management
Level 1 Level 2
2. Strategic Alliance Management
Approach alliance
candidates
2.1
Develop outline alliance
2.2
Execute & manage alliance
2.3
Defined alliance approach
Define roles & responsibilities for both SABIC
and supplier
Establish joint alliance team and
plan activities
Develop co- metrics to
manage ongoing performance and
risk
Defined outline alliance
Schedule alliance workshop
2.2.1 2.2.2 2.2.3 2.2.4
91
Classification: Internal Use
PROCESS FLOW: STRATEGIC ALLIANCE MANAGEMENT
Supplier
Segmentation
1
Strategic Alliance Management
ID Process activity Description Input Output
2.2 Develop outline alliance
2.2.1 Schedule alliance workshop
Schedule alliance workshops to align on several key activities for successful alliance
• Supplier feedback, insights and inputs
• Confirmed alliance
2.2.2 Define roles & responsibilities for both SABIC and supplier
Map both internal SABIC and external supplier stakeholders and define roles & responsibilities for the alliance (e.g. escalation route, main point of contact, alliance owners, etc.)
• SABIC & supplier joint discussion
• Relevant stakeholders
• Defined roles & responsibilities and mapped stakeholders
2.2.3 Establish joint alliance team and plan activities
Establish the SABIC/ supplier alliance team and layout the meeting schedule for the upcoming year as well as any additional activities to resolve pending concern areas and co-initiatives (e.g. performance improvement meetings).
• Relevant stakeholders
• Proposed meeting schedule
• Any concern areas (if applicable) generated from questionnaire
• Annual alliance plan with established alliance team
2.2.4 Develop co-metrics to manage ongoing performance and risk
Define and develop metrics jointly related to performance and risk management to be monitored over the course of the alliance.
• Joint KPIs • Alliance team • Target setting
• Developed co- metrics to be tracked
Ref 2.2 Alliance charter
Relevant tools & templates for process step:
Ref 2.2.3 Health check questionnaire
92
Classification: Internal Use
PROCESS FLOW: STRATEGIC ALLIANCE MANAGEMENT
Supplier
Segmentation
1
Strategic Alliance Management
2
2.3 Execute & manage alliance
Defined outline alliance
Host agreed meetings as per
the schedule
Ongoing tracking of co-developed
metrics
Ongoing feedback loop
about the alliance & additional
meetings
2.3.1 2.3.2 2.3.3
Executed alliance plan
Process Decomposition: Strategic alliance management
Level 1 Level 2
2. Strategic Alliance Management
Approach alliance
candidate
2.1
Develop outline alliance
2.2
Execute & manage alliance
2.3
93
Classification: Internal Use
PROCESS FLOW: STRATEGIC ALLIANCE MANAGEMENT
Supplier
Segmentation
1
Strategic Alliance Management
2
ID Process activity Description Input Output
2.3 Execute & manage alliance
2.3.1 Host agreed meetings as per schedule
SABIC to host the agreed supplier meetings as per the alliance charter. Meetings agreed will depend upon the agreed meeting frequency that was decided at the beginning of the alliance.
• Relevant stakeholders for meeting
• Performance / risk data for meetings
• Executed meeting with next applicable actions agreed
2.3.2 Ongoing tracking of co- developed metrics
SABIC and supplier to track the co- developed metrics agreed ongoing and report in the meetings as needed.
• Performance and risk data
• Improvement actions to meet/ exceed KPI targets
2.3.3
Ongoing feedback loop about the alliance & additional meetings (if required)
Continuous communication between SABIC and the supplier. Additional meetings may be required due to an escalation of a particular issue or consistent deterioration of the performance or risk metrics.
• Continuous feedback between the relevant stakeholders
• Escalation of issues
• Received feedback and additional meetings (if required)
Relevant tools & templates for process step:
Ref 2.3.1 Executive alignment mtg. template
Ref 2.3.1 Operational review mtg. template
94
Classification: Internal Use
RACI DEFINITION
RACI is an acronym derived from the four potential roles that an individual or function could play relative to a specific activity or task
R - Responsible: Identifies the function(s)/role that is assigned to execute a particular activity. The degree of responsibility is determined by the accountable person. R’s can be shared
A - Accountable: Designates the function/role that is ultimately accountable for the completion of the activity and who has the ability to say “yes” or “no.” There must be one and only one “A” for a decision or activity. Accountability cannot be delegated
C - Consulted: Identifies the function(s)/role that must be “consulted’ before a decision or activity is finalized. This is a two-way communication
I - Informed: Identifies the function(s)/role that must be notified about the completion or output of the decision or activity. This is a one-way communication
Role of RACI in process design
• Clearly assign functional roles to each of the activities; eliminate ambiguity
• Allocate resources across functions to ensure balance across activities
• Focus efforts within specific functions on highest value-added activities
• Define specific actions to address supporting elements (e.g., process design, IT systems)
• Define “exit” criteria for each role for the successful completion of activities
• Simplify complex inter- and intra-organizational processes and alliances
• Accelerate business processes and streamline organizational structure
RACI matrices in this document provide guidance for assignment of roles in line with tasks and activities detailed out in the supplier segmentation & strategic alliance process framework
95
Classification: Internal Use
RACI MATRIX
Process Level 2 Process GPS
Management GPS
Manufactur- ing
E&PM LC team Research & Technology
Legal Suppliers
Supplier Segmentation
Prepare for segmentation
A, I R C C C C
Define key capabilities A, I R C C C C
Segment supply base A, I R C C C C C1
Select potential alliance suppliers
A, I R C C C C C
Strategic Alliance Management
Approach alliance candidates
A, I R I I I I C I
Develop outline alliance A, I R C C C C C C
Execute and manage alliance
I R Responsibility & accountability depends upon objective
of alliance; the business owns the alliance I R
SABIC_StrategicAlliance_Project_Portfolio_Management_VF.pdf
STRATEGIC ALLIANCE
PROJECT PORTFOLIO MANAGEMENT
2
Classification: Internal Use
HOW DO IDEAS BECOME PROJECTS WITHIN THE ALLIANCE PROGRAM?
Strategic Alliance Program
Local Content Cost Optimization Manufacturing
Excellence Knowledge Transfer
1 Program
4 pillars
ABB MHI Elliott BHGEEmerson Coperion Siemens Yokogawa8 suppliers
Project Ideas
Today’s focus
3
Classification: Internal Use
HOW DO IDEAS BECOME OPPORTUNITIES FOR PROJECTS?
Ideas come from both SABIC
and the suppliers engineers,
procurement teams, etc. and are
added to the idea repository
Ideas can also originate from
ideation workshops
Document: Idea repository
Brainstorming workshops are
held every 3 months. They help
to formulate and develop the
ideas into opportunities
Attendees: Project teams
Document: Description of
chosen ideas
Prioritization workshops are held
every 3 months. They help to
prioritize opportunities and choose
which ones will go further
Attendees:
Document: Description of selected
opportunities
Selected project
opportunities go to the
next phase
1 2 3
5
Classification: Internal Use
THE IDEATION PHASE APPROVES THE BUSINESS CASE
1. Ideation
Reject
project
Project opportunity
Go/No Go decision
Reject
project
Reject
project
Action
Who? Alliance Leader
Action: Identify and document
business needs
Document: 1.1 Business need
request
Who? Alliance Leader
Action: Request Alliance board
approval
Document: 1.2 Formal validation
Who? Alliance board
Action: Request for business case
approval from SteerCo
Document: 1.3 Formal validation
Who? Alliance Leader
Action: Develop business case
Document: 1.4 Business case
Who? Program Leader
Action: Request business case
approval from SteerCo
Document: 1.5 Formal approval
6
Classification: Internal Use
THE QUALIFICATION PHASE DEFINES THE PROJECT DETAILS, RESOURCES AND BUDGET
2. Qualification
Action
Who: Project team
Action: Create a workflow document
Document: 2.1 Detailed project
execution plan
Who: Project team
Action: Mobilize resources
Document: 2.2 RACI
Who: Project team
Action: Estimate budget
Document: 2.3 Budget tracker
Project
7
Classification: Internal Use
THE EXECUTION PHASE ENSURES THAT THE PROJECT IS RAN WELL AND STAYS ON TRACK
3. Execution
Who: Project team
Action: Define communication with
team members
Document: 3.1 RACI
Who: Project team
Action: Monitor quality of work/ feed
data to KPI alliance dashboard
Frequency: Monthly
Document: 3.2 Alliance KPI data
provision
Who: Project team
Action: Manage budget
Frequency: Monthly
Document: 3.3 Expense report
Who: Project team
Action: Report to Alliance Leader
Frequency: Bi-monthly
Document: 3.4 Status Report
Who: Project team
Action: Report to SteerCo
Frequency: 4 times a year
Document: 3.5 Executive Report
Action
Qualified Project
8
Classification: Internal Use
THE CLOSURE PHASE ENSURES THAT THE RESULTS AND THE LESSONS LEARNED ARE CLEARLY IDENTIFIED AND COMMUNICATED
4. Closure
Action
Who: Project team
Action: Analyze project and team
results
Document: 4.1 Lessons learned,
results
Who: Project team
Action: Document project closure
Document: 4.2 Lessons learned,
results, formal project closure
Who: Project team
Action: Account used and unused
budget
Document: 4.3 Budget report
Finished Project Closed Project
9
Classification: Internal Use
Ideation package Execution package Closure Packager
1.1 Business need request 2.1 Detailed project execution plan 4.1 Lessons learned
1.4 Business case 2.2 RACI 4.2 Results
2.3 Budget tracker 4.3 budget report
3.2 Alliance KPI data provision
3.4 Status report
3.5 Executive report
SPECIFIC STEPS REQUIRE THE OUTPUT OF DOCUMENTS FOR APPROVAL
10
Classification: Internal Use
Ideation package Execution package Closure Packager
1.1 Business need request 2.1 Detailed project execution plan 4.1 Lessons learned
1.4 Business case 2.2 RACI 4.2 Results
2.3 Budget tracker 4.3 budget report
3.2 Alliance KPI data provision
3.4 Status report
3.5 Executive report
SPECIFIC STEPS REQUIRE THE OUTPUT OF DOCUMENTS FOR APPROVAL
11
Classification: Internal Use
WHAT IS RACI?
Responsibilities
o The person who actually carries out the process or task assignment
o Responsible to get the job done
o The person who is ultimately accountable for process or task being completed appropriately
o Responsible person(s) are accountable to this person
o People who are not directly involved with carrying out the task, but who are consulted
o May be stakeholder or subject matter expert
o Those who receive output from the process or task, or who have a need to stay informed
Responsible – Assigned to do work
Accountable – Monitoring and has final decision
Consulted – An adviser or subject matter expert who is consulted before a decision or action
Informed – Must be informed
Roles
Steering committee members
Alliance Governance Board
Program Leader
Alliance Leader
Project Team
12
Classification: Internal Use
EACH PHASE DEMANDS THE INVOLVEMENT OF DIFFERENT STAKEHOLDERS
Roles Key responsibilities
Steering Committee Go/No go decision making for business case development, resource commitment and project development
Alliance Governance board Go/ No go decision making for opportunities/initiatives to be presented to the SteerCo
Program Leader Responsible for presenting prioritized and approved opportunities/initiative ideas, by the Governance board, to
the SteerCo
Alliance Leader
Leads brainstorming/prioritizing workshops with alliance partners
Accountable for business request need creation and presentation to the Alliance Governance board
Responsible for overseeing the business case development and presenting it to the SteerCo, alongside the
project team
Project Team
Responsible for developing the business case
Responsible for all project execution and closure activities
Responsible for developing and sharing status reports with alliance leaders
13
APPENDIX
SABIC_StrategicAlliance_Workshop1_FINAL.pdf
STRATEGIC ALLIANCE WORKSHOP 1 – 03.09
OBJECTIVES, SCOPE, GOVERNANCE
2
INTRODUCTION
3
Classification: Internal Use
CONFIDENTIAL
AGENDA FOR TODAY
Scope – Start Small, Scale Fast
Governance
Getting on the same page: What is a Strategic Alliance?
Understanding the Partner’s objectives
Next Steps
4
Classification: Internal Use
OBJECTIVE
Common understanding of strategic alliance definition and objectives
Define the scope for 8 suppliers
Define follow up actions for scope without consensus
Adjust and validate proposed governance
WHAT TO EXPECT
Focused and timely discussions on topic at hand
Topics out of workshop scope will be written and approached later
5
Classification: Internal Use
‘STRATEGIC ALLIANCE’ IS AN UMBRELLA TERM FOR MULTIPLE TYPES OF COLLABORATION SET-UPS WITH A STRONG JOINT
INTEREST BETWEEN PARTNER AND CUSTOMER
A strategic alliance is a long term, cooperative
relationship between SABIC and key Partners designed to
support KSA 2030 Vision, Manufacturing 2025
Strategy and leverage the strategic and operational
capabilities of partners to achieve significant benefits.
Degree of IntegrationLow High
C o
n tr
o l
a n
d D
e c is
io n
-M a k in
g P
o w
e r
High
Low
Joint Venture
Equity Alliance
Non-Equity Alliance**
Contractual Agreement*
M&A
Informal Collaboration
Strategic Alliances
* e.g. Franchising, licensing, cross-licensing
** e.g. Joint R&D, joint product development/manufacturing/marketing, long-term sourcing agreements
6
Classification: Internal Use
STRATEGIC ALLIANCES TYPICALLY SPAN ACROSS BUSINESSES TO FOCUS ON COLLABORATIVE VALUE DEVELOPMENT
SCORE CARD MEASUREMENTS ARE A CRITICAL ENABLER TO BUILD TRUST
Selection of Relationship & interaction characteristics Commodity Preferred Strategic Alliance
Stakeholder involvement Procurement Business Business / Group Group
Formal business ownership
Value focused
Cost/efficiency focused
Innovation and technology focused
Benefit sharing
Score card measurement
Trust
Tendering
7
Classification: Internal Use
SOME THINGS TO KEEP IN MIND WHEN SETTING UP A STRATEGIC ALLIANCE
Capturing
value from
alliances
1. Align alliance
models with
corporate
objectives
2. Size
matters
3. Not yet
fully
leveraged
4. There
are no
shortcuts
5. Good intentions
are not good
enough
6. Not built
to last
7. People
over
commercials
8. More
of it
everywhere
8
Classification: Internal Use
WHY DO ALLIANCES FAIL – AND HOW TO MAKE THEM WORK
All activities fostering mutual trust, collaboration and accountability are regarded as beneficial to the alliance success
55% Organisational structure/ governance
45% Management control 45%
Shared
responsibilities
45% Cultural fit
Contribution by
each partner 64%
Ownership
structure 36%
Process of
changes 36% 45% Specific
timeline
64% Mutual trust
Strategic fit55%
Top Five Challenges Top Five Success Factors
Commercial objectives
notwithstanding, alliances suffer
primarily from not agreeing on
organisational aspects
Mitigation of such potentially
contentious subjects has been
described as key success factor
Thus, all activities fostering mutual
trust, collaboration and
accountability are regarded as
beneficial to the alliance success
9
OBJECTIVES
10
Classification: Internal Use
Whatever we want to do – we want it to be aligned to all corporate objectives
OBJECTIVES DEFINITION
SABIC Corporate Objectives Supplier Corporate
Objectives ?
Alliance
Success
Potential
?
?
?
?
SABIC Alliance Objectives: Technology and knowledge Transfer
Cost Management
Local Content
Manufacturing Excellence
?
11
Classification: Internal Use
What have you done before to understand you supplier’s objectives?
How have you asked your supplier to voice your considerations?
UNDERSTANDING YOUR SUPPLIER`S OBJECTIVES
12
Classification: Internal Use
PUTTING YOUR SUPPLIER’S OBJECTIVES INTO S.M.A.R.T GOALS
Sept 18th
Specific Who, what, where, when, why, and which? Define the goal as much as possible without any ambiguous language
Measurable From – To? Define how to track the progress and measure the outcome ( how much? How many?)
Attainable How? Is the goal reasonable enough to be accomplished?
Relevant Worthwhile? Is the goal worthwhile and will it meet your needs?
Timely When? What is the time limit for your goal to be accomplished?
To be discussed on for each
alliance separately :
SMART goals ensure that objectives are transformed into realistic milestones through the following gates:
13
SCOPE
14
Classification: Internal Use
Winning approach to a successful alliance
NEXT STEPS TO TAKE
You are here
Think Big
Define Roadmap
for Success
Define Roadmap
Perform a quick Proof of
Value
Identify set of Use Cases
Start Small
Start Building
Solutions
Pursue incremental and
iterative approaches
Pursue specific business
goals under joint governance
Scale Fast
Roll-out
Build culture of pursuing
alliance and mitigating risks
Engage end-users early on
Feasibility
Check
Identify and correct
weaknesses early
Track benefits and efforts
closely and forecast
anticipated end-state based
on new insights
Understand critical risks and
define mitigating actions
15
Classification: Internal Use
BEFORE WE AGREE ON SCOPE – TWO KEY ASPECTS TO CONSIDER…
Alliance
Scope
?
?
?
?
?
?
What scope
can we agree
to start on?
Potential upside for Partner
?
?
Potential upside for SABIC
Upsides for
Partner and
SABIC?
16
Classification: Internal Use
For each Alliance, let’s define an Alliance scope that is:
- Aligned to SABIC’s and the Partner’s mutual objectives
- Leads to mutual benefits and a clear measurable value
- Not just innovative, but truly transformational
- Starts small to celebrate success early
- Defines category, geography and business unit
LET’S FIND THE COMMON GROUND
As inspiration, we’ll use a spend
taxonomy for every Partner
17
Classification: Internal Use
MOCK SPEND TAXONOMY
Spend - Level 1x Spend - Level 2 Spend - Level 3
Rotating equipment
Motors
Equipment Purchase
Spare parts Purchase
Inventory Service fee
Installation Services on-site at SABIC
Maintenance Services on-site at SABIC
Overhaul Services in #Supplier# Workshop
Transportation Services
Pumps
Equipment Purchase
Spare parts Purchase
Inventory Service fee
Installation Services on-site at SABIC
Maintenance Services on-site at SABIC
Overhaul Services in #Supplier# Workshop
Transportation Services
Compressors
Equipment Purchase
Spare parts Purchase
Inventory Service fee
Installation Services on-site at SABIC
Maintenance Services on-site at SABIC
Overhaul Services in #Supplier# Workshop
Transportation Services
Gearboxes
Equipment Purchase
Spare parts Purchase
Inventory Service fee
Installation Services on-site at SABIC
Maintenance Services on-site at SABIC
Overhaul Services in #Supplier# Workshop
Transportation Services
Extruders
Equipment Purchase
Spare parts Purchase
Inventory Service fee
Installation Services on-site at SABIC
Maintenance Services on-site at SABIC
Overhaul Services in #Supplier# Workshop
Transportation Services
Ventilators
Equipment Purchase
Spare parts Purchase
Inventory Service fee
Installation Services on-site at SABIC
Maintenance Services on-site at SABIC
Overhaul Services in #Supplier# Workshop
Transportation Services
Spend – Level 1 Spend – Level 2 Spend – Level 3
18
Classification: Internal Use
SUPPLIERS IN SCOPE
Supplier
Yokogawa
Emerson
ABB
Coperion
Elliott
Siemens
MHI
GE
19
Classification: Internal Use
Spent Taxonomy drilldown
OUTCOME
Partner Agreed scope TBD scope areas Activity Owner Due
Date
20
GOVERNANCE
21
Classification: Internal Use
8 ESSENTIAL PRINCIPLES FOR GOOD GOVERNANCE
3 Responsiveness
4 Consensus oriented
2 Transparency
1 Legal validation
8 Accountability
9 Participation
7 Effectiveness and efficiency
6 Inclusiveness
Fair legal frameworks that are enforced by an impartial regulatory
body, for the full protection of stakeholders.
• Provides the opportunity for its stakeholders to maintain, enhance, or
generally improve their well-being provides the most compelling
message regarding its reason for existence and value to society.
Information should be provided in easily understandable forms
and media; freely available and directly accessible to all parties
who will be affected by governance policies and practices.
• Processes implemented by the organization to produce favorable
results meet the needs of its stakeholders, while making the best use of
resources – human, technological, financial, natural and environmental
– at its disposal.
Processes are designed to serve the best interests of stakeholders
within a reasonable timeframe
• Who is accountable for what should be documented in policy
statements. In general, an organization is accountable to those who will
be affected by its decisions or actions as well as the applicable rules of
law.
consultation to understand the different interests of stakeholders in
order to reach a broad consensus of what is in the best interest of
the entire stakeholder group and how this can be achieved in a
sustainable manner.
• Participation needs to be informed and organized, including freedom
of expression and concerns for the best interests of the organization
and society in general.
22
Classification: Internal Use
WHO SHOULD BE INVOLVED ?
Strategic alliance program lead
Alliance team lead Alliance team lead Alliance team lead Alliance team lead
Project management teamProject management teamProject management teamProject management team
Alliance champion
(pillar 1)
Operational support (data sharing / finance / legal )
Alliance champion
(pillar 2)
Alliance champion
(pillar 3)
Alliance champion
(pillar 4)
Governance board
Change management lead
Sponsors Business unit managers Alliance program lead
Steering Committee
23
Classification: Internal Use
WRAPPING IT UP !
Thank you!
StrategicAlliance_KPIsOutcome_20190918.pdf
STRATEGIC ALLIANCE WORKSHOP – KPI’S AND VALUE DISTRIBUTION
18 SEPTEMBER 2019
2
Classification: Internal Use
SABIC AND THE ALLIANCE PARTNER SHARE A SET OF COMMON GOALS WITHIN THE ALLIANCE
High-level objectives Long-term Win-Win Cooperative Trust Mutual benefits
Specific objectives SUPPLIER Corporate goals
SABIC Corporate goals
Local Content
Talent & knowledge
Cost Optimization
Manufacturing excellence
Local Content
Access to engineering
knowledge
Business opportunities
Efficient transactions
Profitability/growth
Push innovation/new ideas
3
Classification: Internal Use
ALLIANCE KPIS AND PROJECT METRICS HAVE DIFFERENT PURPOSES BUT ARE INTERDEPENDENT
Guiding principles
Alliance KPI’s
Project metrics
KPI hierarchy
Monitors the impact of projects in corporate and KSA 2030
objectives
Monitors the performance of individual projects
Objectives
KPIs must be actionable and attainable
Your business and its goals are unique, and so should your KPIs
“Less is more” – focus on less than 10 factors
KPIs are a form of communication – Ensure that KPIs are clear and concise
4
Classification: Internal Use
THE ALLIANCE KPI’S NEEDS TO FOCUS ON HOW WE DEFINE SUCCESS
“Our alliance will be a success when we achieve…”
Increase local content
Increase contract coverage
Increase value creation
Improve reliability
Speed up technical support
Improve efficiency Establish competency & assurance program
Collaborate and innovate
Manage knowledge and networks
Report on progress
Build trust through solid governance
5
Classification: Internal Use
KPI’S HAVE BEEN DEFINED ACROSS PILLARS TO MEASURE THE SUCCESS
Pillar Alliance KPI Unit Description
Safety # of incidents # Number of safety-related incidents
Local content Local content % Net increase of local content by x% as per Namaa scorecard versus 2019 baseline
Cost optimization
Contract coverage % Net increase of spend covered by negotiated contract versus 2019 baseline
Value creation % Net total cost reduction versus 2019 baseline in unit, process, installation, maintenance, warehousing, spare parts and decommission costs
Manufacturing excellence
Reliability % - Net increase in MTBF versus 2019 baseline - Net increase in equipment availability versus 2019 baseline - Net increase in MTBR versus 2019 baseline
Technical support % Net improvement in resolution time versus 2019 baseline
Efficiency % Net decrease in rework versus 2019 baseline
Technology & knowledge transfer
Competency & assurance program
# + % - Number of joint programs developed to increase competencies - Number of training certifications obtained - Net decrease in technical requests by xx % versus 2019 baseline
Collaboration and innovation % - Completion versus plan to have center operational by xx/xx/20xx - Reach satisfaction level of x% (measured through survey)
Networking and knowledge management
# - Number of lessons learned shared - Number of shared technical alerts - Number of product improvements
Alliance governance
Governance meetings performed
% Execution of governance as per the agreed plan (number of meetings, meeting attendance)
Reporting % Execution of governance as per the agreed plan (number of reports and dashboard updates)
6
Classification: Internal Use
SAMPLE KPI DASHBOARD
Pillar Alliance KPI Unit Description Base- line
2020 2021 2022 2023 Target
Safety # of incidents # Number of safety-related incidents 1 0 0 0 0 0
Local content Local content % Net increase of local content by x% as per Namaa scorecard versus 2019 baseline
35% 40% 45% 50% 60% 70%
Cost optimization
Contract coverage % Net increase of spend covered by negotiated contract versus 2019 baseline
40% 45% 55% 65% 75% 90%
Value creation % Net total cost reduction versus 2019 baseline in unit, process, installation, maintenance, warehousing, spare parts and decommission costs
0% -1% -3% -5% -7% -10%
Manufacturing excellence
Reliability % - Net increase in MTBF versus 2019 baseline - Net increase in equipment availability versus 2019 baseline - Net increase in MTBR versus 2019 baseline
0% 5% 10% 15% 20% 25%
Technical support % Net improvement in resolution time versus 2019 baseline 0% 5% 10% 15% 20% 25%
Efficiency % Net decrease in rework versus 2019 baseline 0% 5% 10% 15% 20% 25%
Technology & knowledge
transfer
Competency & assurance program
# + % - Number of joint programs developed to increase competencies - Number of training certifications obtained - Net decrease in technical requests by xx % versus 2019 baseline
0 0
0%
2 2
-5%
4 4
-15%
8 8
-30%
16 16-
40%
25 25
-50%
Collaboration and innovation
% - Completion versus plan to have center operational by xx/xx/20xx - Reach satisfaction level of x% (measured through survey)
0% 25% 75% 100% 100% 100%
Networking and knowledge
management #
- Number of lessons learned shared - Number of shared technical alerts - Number of product improvements
0 0 0
2 2 2
4 4 4
8 8 8
16 16 16
25 25 25
Alliance governance
Governance meetings
performed %
Execution of governance as per the agreed plan (number of meetings, meeting attendance)
n/A 100% 100% 100% 100% 100%
Reporting % Execution of governance as per the agreed plan (number of reports and dashboard updates)
n/A 100% 100% 100% 100% 100%