Construction estimating
CON/CNE 383 CONSTRUCTION ESTIMATING SPRING 2019
Finishes
Instructions
1. Assume any required values if not stated in the problem statement.
2. Submit your assignment through Critviz.
3. This assignment is to be completed within your teams.
4. Late submissions will be accepted till the end of the semester for a 75% grade deduction.
5. No handwritten solutions will be accepted.
6. File naming format: Team __ – Finishes.
7. The assignment is valued at 15 possible points.
8. Show all calculations and formulas, state all assumptions.
9. Failure to follow instructions will result in deductions
Question
Take off the finishes from the Yuma, AZ Marine Corps Air Station Fuel Farm. You are required to use On-Screen Takeoff. This includes:
· All gypsum board (can be taken-off as an assembly)
· All metal stud walls (can be taken-off as an assembly)
· Suspended Acoustical Ceiling
· All wall paint
Use the provided sheets from R.S. Means to complete the costs. Ensure you are using the correct table formatting for the takeoff pricing.
Your final Excel submission should include the final estimate table as well as screenshots of your OST takeoffs.
Dr. Kenneth Sullivan Page 1 of 2