Development of a Project Cost Estimate
Problem Statement and deliverables
Prepare a comprehensive quantity and cost estimate for a small Commercial Project (Drawings
are attached). The estimate should include the following components:
• Office and job overheads (from assignment 2)
• Excavation
• Concrete
• Masonry
• Metal
• Thermal and moisture protection
The drawings provided are not comprehensive so you might have to make some assumptions
related to the quantities and cost. If so, please include a list of assumptions in the beginning of
your final report. You also have to prepare an estimate summary sheet at the end (Sheet is
attached as an excel file). You all have to include your overhead estimate from Assignment #2 in
the summary sheet.
Please refer to Appendix C of the textbook for the Specifications and Addenda related to the
project. You will need this information for preparing the quantity estimate of each component.
Grading criteria
Total points possible: 300
Please use single line space, 12 points Times New Roman font and 1” margin on all the sides of
your document. The document should be checked for any grammatical errors. The rubric is as
follows:
Elements Points
Document is presented professionally 15
Cover page 5
List of assumptions 20
Calculations are shown for each component 200
Estimate summary excel sheet included 30
Concluding remarks 20
Resources used 10
20
fei04054_inserts.1.qxd 11/16/07 2:42 PM Page 20
21
fei04054_inserts.1.qxd 11/16/07 2:42 PM Page 21
22
fei04054_inserts.1.qxd 11/16/07 2:42 PM Page 22
23
fei04054_inserts.1.qxd 11/16/07 2:42 PM Page 23
- 1
- AppC_A1
- AppC_A2
- AppC_A3
- AppC_A4