FEMA452-RiskAssessmentWk3.pdf

STEP 4: RISK ASSESSMENT

4-1STEP 4: RISK ASSESSMENT

OVERVIEW

The fourth step in the assessment process is to prepare a risk assessment for your site and building (see Figure 4-1). The risk assessment analyzes the threat, asset value, and vulnerability to ascertain the level of risk for each critical asset against each applicable threat. Inherent in this is the likelihood of the threat oc- curring and the consequences of the occurrence.

The risk assessment process involves the following tasks:

❍ Preparing the risk assessment matrices

❍ Determining the risk ratings

❍ Prioritizing observations in the Building Vulnerability Assessment Checklist

TASKS:

4.1. Preparing the risk assessment matrices

4.2. Determining the risk ratings

4.3 Prioritizing observations in the Building Vulnerability Assessment Checklist

Step 2: Asset Value Assessment

Step 4: Risk Assessment

Step 3: Vulnerability Assessment

Step 1: Threat Identification and Rating

Figure 4-1 Steps and tasks

There are a number of methods and means to conduct a building risk assessment, and the steps can be accomplished in different sequences. How- ever, they all have one common objective, which is to apply a quantitative assessment process that identifies those assets at highest risk and evaluate mitigation measures that can reduce that risk. The process selected for this How-To Guide is described below.

Step 5: Consider Mitigation Options

4-2 STEP 4: RISK ASSESSMENT

Preparing the Risk Assessment Matrices (Task 4.1)

In order to estimate potential losses, a series of matrices have been prepared. The inputs for these matrices are based on the analysis performed during Steps 1, 2, and 3.

To estimate risk, a number of factors need to be taken into consideration. The first one is to identify and rate the threats that could cause harm to a building and its inhabitants. Next, the value of assets and people that need to be protected will be identified. After threats and assets are identified, a vulnerability rating that identifies weaknesses that might be exploited by a ter- rorist or aggressor is determined. Risk can be computed using the results of the threat rating, asset value, and vulnerability rating.

Tables 4-1 to 4-10 can be used as a pre-assessment screening tool by the Team while conducting the on-site meetings with key staff members (e.g., building owners, security, site management, key function representatives, etc.). The tables should be completed by consensus judgment of the building stake- holders and Assessment Team members. The risk assessment matrices can provide both a quantitative score and color code to objectively and visually determine the functions and systems that have been determined to be at risk.

During Steps 1 and 2, you should have identified your threat rating (Work- sheet 1-2), asset value (Worksheet 2-1), and vulnerability rating (Worksheet 3-3). At this point, you should transfer these values to Worksheets 4-1 and 4-2.

In the risk assessment matrices, the threats are listed across the top, and the functions and infrastructure are listed down the side to create threat-pairs. In general, there are two approaches to complete Worksheets 4-1 and 4-2. One approach is to start with all cell elements set to zero and discuss each ele- ment in detail to arrive at a consensus number. Another approach is to start with all cell elements equal to a numeric value (e.g., “5”) and then adjust cell values up or down. With either approach, the first few rows and columns will take the longest time to reach consensus values, but, as the group becomes familiar with the ratings and scales, the process converges quickly. It should take approximately 3 to 4 hours to complete the matrices and, during that time, many of the building vulnerabilities will be verbally identified and col- laborated with the vulnerability portfolio and earlier building site tour.

Identifying and Determining the Threat Rating. Step 1 will help you to identify and come to a consensus in terms of the threat rating. After each threat/hazard has been identified and defined, the threat level for each

4-3STEP 4: RISK ASSESSMENT

threat/hazard shall be determined. The threat rating is a subjective judg- ment of a terrorist threat based on existence, capability, history, intentions, and targeting. The threat rating is a snapshot in time, and can be influenced by many factors, but the given threat value will typically be the same for each function (going down the columns). Organizations that are dispersed in a campus environment may have variations in ratings. For threat rating, a scale from 1-10 was assigned: 10 is considered very high; 8-9 is high; 7 is medium high; 5-6 is medium; 4 is medium low; 2-3 is low; and 1 is very low.

Rating the Asset Value. Step 2 will help you to determine the asset value rating for your site and/or building. After a building’s assets requiring protection have been identified, they should be assigned a value. The asset value is the degree of debilitating impact that would be caused by the incapacity or de- struction of the building’s assets. There are a number of methods and means to conduct a building risk assessment, and the steps can be accomplished in different sequences, but the objective is to apply a quantitative assessment process that identifies those assets at highest risk and evaluate mitigation mea- sures that can reduce that risk. For an asset value rating, a scale from 1-10 was assigned: 10 is considered very high; 8-9 is high; 7 is medium high; 5-6 is me- dium; 4 is medium low; 2-3 is low; and 1 is very low.

Assessing the Vulnerability. Step 3 will help you to determine the vulnerability rating for your site and/or building. After your threat rating and asset value rating have been identified, the vulnerability rating should be determined. Vulnerability rating requires identifying and rating the vulnerability of each asset-threat pair. An indepth vulnerability assessment of a building evaluates specific design and architectural features, and identifies all vulnerabilities of the building functions and building systems. In the vulnerability rating scale of 1 to 10, 1 means very low or no weaknesses exist, and 10 means one or more major weaknesses exist to make an asset extremely susceptible to an ag- gressor.

Critical Functions Asset Value. Table 4-1 depicts a portion of the site critical functions matrix. It lists the functions down the left side and threats across the top. The asset value rating is entered into the site critical functions matrix and begins the process of quantifying the risk elements. In general, the asset value for a given function is the same for all threats and the matrix helps to identify the primary functions in a quantitative form. The functions matrix is people oriented and subjective, and provides a guide to vulnerabilities and risks. The asset value under the engineering and administration functions is highlighted. For administration, a medium asset value (5) was assigned for

4-4 STEP 4: RISK ASSESSMENT

all threats. For engineering, a high asset rating (8) was determined for all threats.

Table 4-1: Critical Functions Asset Value

Function Cyber Attack

Vehicle Bomb

Suicide Bomber

Chemical (Sarin)

Biological (Ricin)

Administration Asset Value 5 5 5 5 5 Threat Rating Vulnerability Rating

Engineering Asset Value 8 8 8 8 8 Threat Rating Vulnerability Rating

Critical Infrastructure Asset Value. Table 4-2 depicts a portion of the site crit- ical infrastructure matrix. It lists infrastructure down the left side and threats across the top. In general, the asset value for a given infrastructure asset is the same for all threats and is usually the economic cost of replacement. The value can be changed to reflect intangibles such as duration of loss, loss of production capability, etc. The asset value rating under the site and structural systems is highlighted. A medium low asset value rating (4) was assigned for the site infrastructure threat pairs. A high asset value rating (8) was assigned for the structural system threat pairs.

Table 4-2: Critical Infrastructure Asset Value

Infrastructure Cyber Attack

Vehicle Bomb

Suicide Bomber

Chemical (Sarin)

Biological (Ricin)

Site Asset Value 4 4 4 4 4 Threat Rating Vulnerability Rating

Structural Systems Asset Value 8 8 8 8 8 Threat Rating Vulnerability Rating

Critical Functions Threat Rating. The threat rating under the site and struc- tural systems is highlighted in Table 4-3. A high threat rating (8) was assigned for a cyber attack based on known groups releasing worms and viruses; a me- dium low threat rating (4) was assigned for a vehicle bomb; a medium threat rating (5) was assigned for a suicide bomber based on current intelligence on known groups and quantity of explosives available; and a low threat rating (2)

4-5STEP 4: RISK ASSESSMENT

was assigned for both Sarin and Ricin attacks based on current intelligence of prior targets and predicted use against future targets (assuming that the building is not the primary target, but may experience collateral damage ef- fects).

Table 4-3: Critical Functions Threat Rating

Function Cyber Attack

Vehicle Bomb

Suicide Bomber

Chemical (Sarin)

Biological (Ricin)

Administration Asset Value 5 5 5 5 5 Threat Rating 8 4 5 2 2 Vulnerability Rating

Engineering Asset Value 8 8 8 8 8 Threat Rating 8 4 5 2 2 Vulnerability Rating

Critical Infrastructure Threat Rating. The threat rating under the site and structural systems is highlighted in Table 4-4. A high threat rating (8) was as- signed for a cyber attack based on known groups releasing worms and viruses; a medium low threat rating (4) was assigned for a vehicle bomb; a medium threat rating (5) was assigned for a suicide bomber based on current intelli- gence on known groups and quantity of explosives available; and a low threat rating (2) was assigned for both Sarin and Ricin attacks based on current in- telligence of prior targets and predicted use against future targets (assuming that the building is not the primary target, but may experience collateral damage effects).

Table 4-4: Critical Infrastructure Threat Rating

Infrastructure Cyber Attack

Vehicle Bomb

Suicide Bomber

Chemical (Sarin)

Biological (Ricin)

Site Asset Value 4 4 4 4 4 Threat Rating 8 4 5 2 2 Vulnerability Rating

Structural Systems Asset Value 8 8 8 8 8 Threat Rating 8 4 5 2 2 Vulnerability Rating

Critical Functions Vulnerability Rating. In Table 4-5, for administration, a medium high vulnerability rating (7) was determined for a cyber attack; a medium high vulnerability rating (7) was determined for a vehicle bomb; a

4-6 STEP 4: RISK ASSESSMENT

high vulnerability rating (9) was assigned for a suicide bomber, and for Sarin and Ricin attacks because administration is located at the lobby entrance. For engineering, a medium vulnerability rating (7) was determined for a cyber attack; a medium low vulnerability rating (4) was determined for a ve- hicle bomb; a medium vulnerability rating (5) was determined for a suicide bomber; and a medium vulnerability rating (6) was determined for a Sarin or Ricin attack.

Table 4-5: Critical Functions Vulnerability Rating

Function Cyber Attack

Vehicle Bomb

Suicide Bomber

Chemical (Sarin)

Biological (Ricin)

Administration Asset Value 5 5 5 5 5 Threat Rating 8 4 3 2 2 Vulnerability Rating 7 7 9 9 9

Engineering Asset Value 8 8 8 8 8 Threat Rating 8 5 6 2 2 Vulnerability Rating 7 4 5 6 6

Critical Infrastructure Vulnerability Rating. In Table 4-6, a low vulnerability rating (1) was determined for a cyber attack because there are no internet devices; a medium high vulnerability rating (7) was determined for a vehicle bomb; a low vulnerability rating (3) was determined for a suicide bomber; a low vulnerability rating (2) for Sarin and Ricin attacks because there would be little damage impact on the site. For structural systems, a low vulnerability rating (1) was determined for a cyber attack; a high vulnerability rating (10) was determined for a vehicle bomb due to progressive collapse concerns; a medium vulnerability rating (6) was determined for a suicide bomber who could place a device next to a primary support and load bearing column; and a low vulnerability rating (1) was determined for a Sarin or Ricin attack be- cause there would be little or no damage.

4-7STEP 4: RISK ASSESSMENT

Table 4-6: Critical Infrastructure Vulnerability Rating

Infrastructure Cyber Attack

Vehicle Bomb

Suicide Bomber

Chemical (Sarin)

Biological (Ricin)

Site Asset Value 4 4 4 4 4 Threat Rating 8 4 5 2 2 Vulnerability Rating 1 7 3 2 2

Structural Systems Asset Value 8 8 8 8 8 Threat Rating 8 4 5 2 2 Vulnerability Rating 1 10 6 1 1

Determining the Risk Ratings (Task 4.2)

Risk is the potential for a loss or damage to an asset. It is measured based upon the value of the asset in relation to the threats and vulnerabilities as- sociated with it. Risk is based on the likelihood or probability of the hazard occurring and the consequences of the occurrence. A risk assessment ana- lyzes the threat (probability of occurrence), asset value (consequences of the occurrence), and vulnerabilities to ascertain the level of risk for each asset against each applicable threat/hazard. The risk assessment provides engi- neers and architects with a relative risk profile that defines which assets are at the greatest risk against specific threats.

There are numerous methodologies and technologies for conducting a risk assessment. For this How-To Guide, the approach is to assemble the results of the threat assessment, asset value assessment, and vulnerability assessment, and determine a numeric value of risk for each asset and threat/hazard pair in accordance with the following formula:

Risk = Asset Value x Threat Rating x Vulnerability Rating

To prepare the risk estimation matrices three factors or elements of risk are considered for each function or system against each threat previously identi- fied. Multiplying the values assigned to each of the three factors provides quantification of total risk. The total risk for each function or system against each threat is assigned a color code. The results of the risk assessment should be used to help prioritize which mitigation measures should be adopted, given limited resources, in order to achieve a desired level of protection. To determine your risk rating, you may use Table 4-7, which includes information on observations in the Building Vulnerability Assessment Checklist (Appendix A) on the total risk scale and color codes. A site functional pre-screening matrix is shown in Table 4-8 and a site infrastructure pre-screening matrix is

4-8 STEP 4: RISK ASSESSMENT

shown in Table 4-9. Worksheets 4-1 and 4-2 will assist you in preparing and organizing the infor- mation for your risk assessment.

Table 4-7: Total Risk Scale Color Code

Low Risk Medium Risk High Risk

Risk Factors Total 1-60 61-175 ≥ 176

Table 4-8: Site Functional Pre-Assessment Screening Matrix

Function Cyber Attack Vehicle Bomb Suicide Bomber Chemical (Sarin) Biological (Ricin)

Administration 280 140 225 90 90 Asset Value 5 5 5 5 5 Threat Rating 8 4 5 2 2 Vulnerability Rating 7 7 9 9 9

Engineering 448 128 200 96 96 Asset Value 8 8 8 8 8 Threat Rating 8 4 5 2 2 Vulnerability Rating 7 4 5 6 6

Warehousing 168 96 135 54 54 Asset Value 3 3 3 3 3 Threat Rating 8 4 5 2 2 Vulnerability Rating 7 8 9 9 9

Data Center 320 128 120 64 64 Asset Value 8 8 8 8 8 Threat Rating 8 4 5 2 2 Vulnerability Rating 5 4 3 4 4

Food Service 112 32 50 36 36 Asset Value 2 2 2 2 2 Threat Rating 8 4 5 2 2 Vulnerability Rating 7 4 5 9 9

Security 392 140 350 126 126 Asset Value 7 7 7 7 7 Threat Rating 8 4 5 2 2 Vulnerability Rating 7 5 10 9 9

Housekeeping 112 24 30 12 12 Asset Value 2 2 2 2 2 Threat Rating 8 4 5 2 2 Vulnerability Rating 7 3 3 3 3

Day Care 504 324 405 162 162 Asset Value 9 9 9 9 9 Threat Rating 8 4 5 2 2 Vulnerability Rating 7 9 9 9 9

4-9STEP 4: RISK ASSESSMENT

Table 4-9: Site Infrastructure Pre-Assessment Screening Matrix

Infrastructure Cyber Attack Vehicle Bomb Suicide Bomber Chemical (Sarin)

Biological (Ricin)

Site 32 128 60 16 16 Asset Value 4 4 4 4 4 Threat Rating 8 4 5 2 2 Vulnerability Rating 1 7 3 4 4

Architectural 40 180 175 20 20 Asset Value 5 5 5 5 5 Threat Rating 8 4 5 2 2 Vulnerability Rating 1 9 7 2 2

Structural Systems 64 320 240 32 32 Asset Value 8 8 8 8 8 Threat Rating 8 4 5 2 2 Vulnerability Rating 1 10 6 2 1

Envelope Systems 56 252 210 28 14 Asset Value 7 7 7 7 7 Threat Rating 8 4 5 2 2 Vulnerability Rating 1 9 6 2 1

Utility Systems 112 168 70 28 14 Asset Value 7 7 7 7 7 Threat Rating 8 4 5 2 2 Vulnerability Rating 2 6 2 2 1

Mechanical Systems 56 224 175 126 126 Asset Value 7 7 7 7 7 Threat Rating 8 4 5 2 2 Vulnerability Rating 1 8 5 9 9

Plumbing and Gas Systems 40 120 75 60 20 Asset Value 5 5 5 5 5 Threat Rating 8 4 5 2 2 Vulnerability Rating 1 6 3 6 2

Electrical Systems 392 224 210 28 14 Asset Value 7 7 7 7 7 Threat Rating 8 4 5 2 2 Vulnerability Rating 7 8 6 2 1

Fire Alarm Systems 72 216 320 36 18 Asset Value 9 9 9 9 9 Threat Rating 8 4 5 2 2 Vulnerability Rating 1 6 8 2 1

IT/Communications Systems 512 192 240 32 16 Asset Value 8 8 8 8 8 Threat Rating 8 4 5 2 2 Vulnerability Rating 8 6 6 2 1

4-10 STEP 4: RISK ASSESSMENT

Prioritizing Observations in the Building Vulnerability Assessment Checklist (Task 4.3)

The Building Vulnerability Assessment Checklist relates to building core infrastructure. During Task 3.3, the Assessment Team performed an on-site as- sessment and filled out observations in the Building Vulnerability Assessment Checklist. (Table 4-10 provides a nominal example.) As mentioned before, the Checklist is a key tool in the preparation of the vulnerability assessment. It is used to guide the assessors performing the assessment of the facility. The vulnerabilities of the facility are selected from the observations provided for each vulnerability question. These vulnerabilities are then prioritized to determine the most effective mitigation measures. Prioritization is based on the greatest vulnerabilities that can be exploited by the aggressors and largest risks in terms of loss of lives, building damage, and loss of operation. Task 4.3 is the final task of the risk assessment. It allows the assessors to rank their observed facility vulnerabilities and proposed remedial actions. Worksheet 4- 3 will help you to perform this task. For more information on how to use the Building Vulnerability Assessment Checklist, see Step 3 and Appendix A.

4-11STEP 4: RISK ASSESSMENT

Table 4-10: Nominal Example of Observations in the Building Vulnerability Assessment Checklist

Section Vulnerability Question Guidance Observations

1. Site

Is a perimeter fence or other types of barrier controls in place?

The intent is to channel pedestrian traffic onto a site with multiple buildings through known access control points. For a single building, the intent is to have a single visitor entrance.

Reference: GSA PBS-P100

The main gate entrance remains wide open for vehicle and pedestrian intruders. There are missing street signs throughout the facility. It is difficult to channel staff and visitors to control access points. There is only one security vehicles to serve the entire campus; at least two more are required.

2. Architectural

2.27 Is interior glazing near high- risk areas minimized?

Is interior glazing in other areas shatter-resistant?

Interior glazing should be minimized where a threat exists and should be avoided in enclosures of critical functions next to high-risk areas.

Reference: GSA PBS-P100

In the main facade, windows are not blast-resistant and the glass is not properly anchored to the frame. In case of a blast event, it is anticipated that the glass will break and will not remain in the frame. This could cause extensive injuries in case of an explosive event.

8. Utility Systems

8.6 Does emergency backup power exist for all areas within the building or for critical areas only?

How is the emergency power distributed?

Is the emergency power system independent from the normal electrical service, particularly in critical areas?

There should be no single critical node that allows both the normal electrical service and the emergency backup power to be affected by a single incident. Automatic transfer switches and interconnecting switchgear are the initial concerns.

Emergency and normal electrical equipment should be installed separately, at different locations, and as far apart as possible.

Reference: GSA PBS-P100

There are single-point vulnerabilities to the steam and electricity lines. Any damage to the steam or electric lines would result in loss of utilities.

4-12 STEP 4: RISK ASSESSMENT

WORKSHEET 4-1: SITE FUNCTIONAL PRE-ASSESSMENT MATRIX

Low Risk Medium Risk High Risk

Risk Factors Total 1-60 61-175 ≥ 176

Worksheet 4-1 can be used to complete your risk assessment by determining the functions at a higher risk. To fill out this matrix, use the scales and color codes, provided in Steps 4.1 and 4.2 .

Function Cyber Attack Vehicle Bomb Suicide Bomber Chemical (Sarin) Biological (Ricin) Administration

Asset Value Threat Rating Vulnerability Rating

Engineering Asset Value Threat Rating Vulnerability Rating

Warehousing Asset Value Threat Rating Vulnerability Rating

Data Center Asset Value Threat Rating Vulnerability Rating

Food Service Asset Value Threat Rating Vulnerability Rating

Security Asset Value Threat Rating Vulnerability Rating

Housekeeping Asset Value Threat Rating Vulnerability Rating

Day Care Asset Value Threat Rating Vulnerability Rating

4-13STEP 4: RISK ASSESSMENT

WORKSHEET 4-2: SITE INFRASTRUCTURE SYSTEMS PRE-ASSESSMENT MATRIX

Worksheet 4-2 can be used to complete your risk assessment by determining the infrastructure at a higher risk.

Infrastructure Cyber Attack Vehicle Bomb Suicide Bomber Chemical (Sarin) Biological (Ricin) Site

Asset Value Threat Rating Vulnerability Rating

Architectural Asset Value Threat Rating Vulnerability Rating

Structural Systems Asset Value Threat Rating Vulnerability Rating

Envelope Systems Asset Value Threat Rating Vulnerability Rating

Utility Systems Asset Value Threat Rating Vulnerability Rating

Mechanical Systems Asset Value Threat Rating Vulnerability Rating

Plumbing and Gas Systems Asset Value Threat Rating Vulnerability Rating

Electrical Systems Asset Value Threat Rating Vulnerability Rating

Fire Alarm Systems Asset Value Threat Rating Vulnerability Rating

IT/Communications Systems Asset Value Threat Rating Vulnerability Rating

4-14 STEP 4: RISK ASSESSMENT

Cross Reference F un

cti on

s

Ad m

in ist

ra tio

n

En gi

ne er

in g

W ar

eh ou

sin g

Da ta

C en

te r

Fo od

S er

vi ce

Se cu

rit y

Ho us

ek ee

pi ng

Da y

Ca re

In fra

str uc

tu re

Si te

Ar ch

ite ctu

ra l

St ru

ctu ra

l S ys

te m

s

En ve

lo pe

S ys

te m

s

Ut ili

ty S

ys te

m s

M ec

ha ni

ca l S

ys te

m s

Pl um

bi ng

a nd

G as

S ys

te m

s

El ec

tri ca

l S ys

te m

s

Fir e

Al ar

m S

ys te

m s

IT /C

om m

un ica

tio ns

S ys

te m

s

Observation 1

Observation 2

Observation 3

Observation 4

Observation 5

Observation 6

Ranked Observations

Observation 1

Observation 2

Observation 3

Observation 4

Observation 5

Observation 6

WORKSHEET 4-3: PRIORITIZATION OF OBSERVATIONS IN THE CHECKLIST

The observations you made in the Building Vulnerability Checklist (Appendix A) during Step 3 should now be used to review the vulnerability ratings in Worksheets 4-1 and 4-2, and then the risk ratings for the associated Threat-Asset Pairs in those worksheets. The observations that you use to confirm or adjust the vulnerability ratings are your selected vulnerabilities that Worksheet 4-3 can help you prioritize. The top portion of Worksheet 4-3 should have the selected observations/vulnerabilities listed in the Cross Reference Column. Using the updated results of Worksheets 4-1 and 4-2, indicate all high risk (red) Functions and Infrastructure column-row intersections that the vulnerability in the Cross Reference Column impacts. As previously stated, prioritization is based on the greatest vulnerabilities that can be exploited by the aggressors and largest risks in terms of loss of lives, building damage, and loss of operation. The bottom portion of Worksheet 4-3 should contain your selected observations/vulnerabilities that meet this statement in rank order – highest to lowest. For example, Ranked Observation 1 would have the highest vulnerability rating matched with the highest risk rating and impacting the greatest number of Functions and Infrastructure. This table can be expanded to include more observations, as needed. In the Risk Assessment Database, vulnerabilities can be given a priority of 1 to 5 as defined by the Manager prior to the assessment. For example, the priority could be based upon the speed in which the vulnerability should be mitigated, or needed level of risk reduction sought, or ability to be exploited by the aggressor, etc.