Gupta et al. SpringerPlus (2015) 4:539 DOI 10.1186/s40064-015-1320-0
CASE STUDY
Exploring prioritization through systematic literature surveys and case studies
Varun Gupta1*, Durg Singh Chauhan2 and Kamlesh Dutta1
Abstract
The software development process is a complex process, especially when the software has to be released in a phased manner. The high stakes involved and several constraints on resources lead to the selective implementation of the user requirements at each stage of the development. If the requirements considered, do not fit well, they have to be reprioritized. The objectives of this paper are to create a background related to the area of reprioritization and to cre- ate a distinguishable position from the prioritization area. The paper elaborates on the current state of reprioritization practices adopted in the software industry. The gaps in research in the area of reprioritization to present future oppor- tunities for the research community are also analysed. This paper builds on the findings of a systematic literature survey (to analyze state of the art in the area of reprioritization), previous case studies (to gain understanding of real scenarios through limited available information), and more detailed real case study (focussed on reprioritization alone) conducted by fewer multinational software development organizations. Based on our studies it is concluded that the efficient reprioritization methods are required to be adopted in software engineering practices of the organisation in order to sustain in the highly competitive mass market.
Keywords: Reprioritization, Prioritization, Mass market software development
© 2015 Gupta et al. This article is distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made.
Background Mass market development progresses from a limited set of requirements, gathered from “unsure and small” cus- tomer base through increments, facing flood of require- ments as input from “larger and slightly known customer base”, until the product captures market and becomes stable. Progress in calendar time leads to the discovery of new viewpoints of new customers [including continu- ous feedback from existing customers (Karlsson et al. 2002)] and new insight into the development process and market trends (Carmel and Becker 1995; Dahlstedt et al. 2003; Potts 1995; Lubars et al. 1993), thereby making the change in requirement priorities as a function of time; a usual activity. The particular increments will involve the stakeholder requests for the new functionality and
the requests for the changes to be made in already deliv- ered functionality. The decision is to be made regard- ing the requirements to be selected for the next release, which makes it common for new changed and delayed requirements to fight for their place. Already imple- mented requirements are to be resubjected to prioritiza- tion because priority varies, as a function of time and it is better to keep priorities updated for many good reasons (example priorities employed during regression testing).
Organizations employ prioritization techniques based on pairwise comparisons to establish priorities, which involve huge effort, as number of input requirements increases because every requirement is to be compared with each other; again leading to increase in number of pairwise comparison (Berander 2007). Prioritization of new requirement will lead to comparison with already implemented, changed and delayed requirements leading to re-estimation of the priorities of the latter. A re-allot- ment involves replacement of old priority with newly cal- culated priority, meaning complete prioritization again,
Open Access
*Correspondence: [email protected] 1 Department of Computer Science and Engineering, National Institute of Technology, Hamirpur, India Full list of author information is available at the end of the article
Page 2 of 15Gupta et al. SpringerPlus (2015) 4:539
which is natural with pairwise comparison. The less effortful method is required that will quickly and accu- rately estimate and re-estimate priorities of requirements.
Reprioritization impacts various activities of incremen- tally developed software like decision aspect prioritiza- tion, requirement prioritization and regression testing (Gupta et al. 2012a, b, 2014a). Reprioritization technique finds its applications in a variety of activities, such as reprioritization of services in IEEE 802.11p (WAVE) VANET’s (Salahuddin et al. 2013), reprioritization of messages in real-time vehicle applications (Preston 2012), reprioritization of presentation materials (Allen et al. 2010), reprioritization of test cases (Budnik and Subramanyan 2013), reprioritization of projects (Held- man 2006) etc.
The area of reprioritization demands the work to iden- tify unaddressed issues and problems. The broad scope of reprioritization study is selected to focus on setting the right position with respect to prioritization, motivating audiences towards the need for generating optimal rep- rioritization practices and adopting practices in develop- ment processes.
The paper is structured as follows: “Research ques- tions” sets the context of the paper by setting research questions with an aim to analyze the state and practices of reprioritization in mass market situations. “Method- ology” elaborates the findings of the systematic litera- ture survey and compares it with the general practices adopted by the mass market software developing firms (details in “State of art: an outcome of systematic litera- ture survey and case studies”). “Reprioritization in con- text to prioritization” tries to set a different, yet related context of reprioritization with respect to prioritization. Details of a literature survey and case study findings and comparison are carried out in “State of art: an outcome of systematic literature survey and case studies”. Finally, the paper concludes in “Conclusion and future work” high- lighting the need for considering reprioritization-aware development so that efficient and evaluated reprioritiza- tion practices can benefit the overall development.
Motivation The survey, conducted by Yoo and Harman (2012) high- lights the limitations of existing prioritization tech- niques (especially those based on ratio scale) to handle the flood of requirements as they suffer from scalability problem (with increase in number of requirements, effort increases). Number of requirements will keep on increas- ing which will increase prioritization efforts. Techniques based on other measurement scale can be used to drasti- cally lower efforts, but the less powerful scale limits this idea because it does not provide detailed information about the results for further analysis. The most powerful
ratio scale techniques are based on pairwise comparison (example AHP). These are considered to be more accu- rate than the non pairwise ones (Karlsson 1996; Karlsson et al. 1998; Perini et al. 2009); although it suffers greatly from scalability problems (Achimugu et al. 2014; Voola and Babu 2013; Perini et al. 2009; Ahl 2005; Karlsson et al. 1998, 2004; Lehtola and Kauppinen 2006; Ribeiro et al. 2011). Software Engineers face dilemma of tradeoffs between the measurement scale, working principle (pair- wise and non pair wise) and effort to be invested.
The literature lacks the prioritization methods that can handle large number of requirements with minimal efforts. Literature provides many prioritization tech- niques differing in measurement scale used and work- ing algorithm, etc. but the efficiency in mass market development environments (continuous flood) is yet to be completely established. The available work is lim- ited to models for performing reprioritization activi- ties, and only a few reprioritization methods, actually focusing on the flood of requirements, are available. Such reprioritization methods must be employed on real softwares to properly comment on their likelihood of passing uncertainty and risks involved in mass mar- ket developments.
The case studies with software development organiza- tions (Gupta et al. 2014b) reveal the mercy situation of software industries, where few industry people under- stand the importance of changing priorities, yet they do not have any established means of doing so, while the majority of them are still unmotivated towards reprior- itization. The industries are still using prioritization tech- niques for changing priorities of changed requirements, while the new requirements are allotted priorities using same prioritization techniques based on guesswork and Business Values.
This motivated the authors of this paper to come up with a comparative analysis based on systematic sur- vey of literature and software industry case studies, that are focused on lack of reprioritization based research and industry software development practices. The net outcome may make the audience aware of the need for sound reprioritization especially based on pairwise comparisons.
Research questions The presented work aims to explore areas of reprioritiza- tion to analyze how much this area is seen differentiable from the area of prioritization in literature and practice. This exploratory research in the area of reprioritization aims to uncover various issues and problems that prove costly to software industries involved in highly competi- tive mass market developments. The literature survey aims to find answers to the following research questions:
Page 3 of 15Gupta et al. SpringerPlus (2015) 4:539
RQ 1. How is the area of reprioritization treated with respect to the area of prioritization?
RQ 2. How is reprioritization carried out by mass mar- ket software industries?
RQ 3. How do the current reprioritization activities handle flood of requirements in mass market development situations?
RQ 4. How is the dynamism in the priorities of decision aspects handled in mass market developments?
Methodology With the objective of finding the answers to above men- tioned research questions, the paper adopts the following research methodology:
• Performing systematic literature surveys to gain insights into the reprioritization area with the objec- tive of uncovering the practices and issues with respect to mass market developments.
• Gaining insights into the current reprioritization practices of software developing organizations by conducting interviews with their representatives.
• Comparison of the literature analysis with those extracted from the current practices analysis.
Reprioritization in context to prioritization The objectives of this paper are as follows: first, to cre- ate background related to the area of reprioritization for creating the distinguishable position from the prioriti- zation area (throughout the paper); second, to present the current state of reprioritization practice in software industries (through interviews with multinational com- panies), and third, to analyse the research gaps in the area of reprioritization so as to present future opportunities for research community (comparison between literature survey and case studies).
The research framework provides the comparison of the two processes i.e. prioritization and reprioritization.
The authors of this paper define reprioritization as “The process of re-establishing the relative ordering among the individual elements of a continuously updated set of requirements by involving the updated decision aspects and updated list of stakeholders”.
This area re-executes prioritization algorithm on a requirement set of larger cardinality (as compared to the cardinality of previous increment) within the environ- ment of enhanced uncertainties and larger cardinalities of inputs involving requirements and decision aspects of a large number of identified customers. This area is best illustrated mathematically as below:
For increment “I”, let R be set of requirements to be implemented. |R| represents cardinality of the set which
further represents the number of requirements to be implemented.
Let S be the set of stakeholders to be involved in deci- sion makings and D be the set of decision aspects. |S| and |D| represents cardinalities of representative sets.
For increment “J” with J > I i.e. I precedes J in imple- mentation ordering, the new sets are denoted by R1, S1 and D1.
Clearly, |R1| ≫ |R|, |S1| ≫ |S|, |D1| ≫ |D|. Let ORDER() be the methods that creates the imple-
mentation ordering among the requirement set. Heuristic() is the method that guides the prioritization
process in optimal manner. Optimization may involve reduction in efforts, time and the increase in quality of decision making.
The reprioritization is achieved using reprioritization() methods. Control abstraction of the reprioritization() function is given below:
These are the control abstractions meaning that actual implementations are not specified. There are various ways of implementing the ORDER() and Heuristic() function. Heuristic() function reuses the old priority to estimate new priority. New priority can be used to estimation of priority of new requirement. Working of this function is based on working algorithm of selected technique.
Further, the cardinality of set R1 keeps on increasing thereby increasing the prioritization efforts and finally increasing reprioritization complexities.
The above reprioritization process is given in the form of a framework in Fig. 1.
Figure 1 shows the reprioritization framework. The prioritization methods or approaches are used to cre- ate ordering among requirements. The incremental mass market software development experiences flood of requirements; hence re-execution of prioritization
Page 4 of 15Gupta et al. SpringerPlus (2015) 4:539
methods is infeasible solution. These methods are to be supplemented with few heuristics or changes in order to manage the scalability problems that may occur with increase in number of requirements.
Decision aspects are also prioritized and their priorities may change. The list of decision aspects may alter thus demanding complete reprioritization (block numbered 2). The list of requirements is updated due to the discov- ery of new customers that specifies new requirements and changes. The new set of requirements comprises new, changed, delayed and already implemented require- ments; all of them subject to prioritization. Prioritization techniques find it difficult to handle such large number of requirements. To uncover this problem the heuristic approach is used to lower prioritization effort. An exam- ple of heuristic approach as proposed in (Gupta et al. 2014a) employs the numerical assignment technique to quickly prioritize the available requirements (denote with set R). The pairwise comparison is performed among fewer requirements of set R and all newly emerged and changed requirements. Lesser effort is due to less effort for reprioritization although new and changed require- ments are completely pairwise prioritized. Further, mini- mization is possible if the new and changed requirements are prioritized with minimal efforts.
Double arrow numbered 1 indicates that aspects are employed for reprioritization and are also subjected to reprioritization. The result is a reprioritized list of requirements or decision aspects.
State of art: an outcome of systematic literature survey and case studies The third objective of this paper is to analyse the research gaps in the area of reprioritization. The gaps will convince the researchers about the possibilities in the area of rep- rioritization by analyzing the work available in current literature (especially case studies) and the findings of real case studies with multinational software development
organizations. This section of the paper does this job by sub diving into subsections that includes the following:
• Systematic literature surveys will help to gain under- standing of the re-prioritization area by analyzing the already done research work. To perform the sys- tematic literature survey, few popular bibliographic databases were triggered against search string, which yielded six papers related to research questions framed in “Research questions”. These fetched papers had been successful in coming up with conceptual models describing the manner reprioritization takes place, factors affecting decision making during rep- rioritization and gaps existing between current prac- tices and those described in the literature. Few papers like (Gupta et al. 2013, 2014a, b) are not covered in the systematic literature survey, although they were published well before the date of searching the biblio- graphic databases and the journals are well covered in ACM digital library and Scopus. The reason might be that the papers were not indexed at the time of search in above mentioned bibliographic databases.
• The reprioritization practices of software develop- ment firms were analyzed by performing interviews with their software engineers, who participated as their representatives. The outcome is finally com- pared with the literature survey findings.
These are discussed in great detail as below.
Systematic literature survey The systematic literature survey was conducted to better position the readers of this paper in the area of reprior- itization. Systematic survey resulted in extraction of less number of informative papers from various bibliographic databases due to limited work done in the area. These papers had been able to come up with conceptual models that focus on how reprioritization is done and the factors that help in decision makings. These conceptual models are derived from analysis of literature and refined as a result of interactions with the software developing firms representatives. The finally derived model represents the industrial practices and highlights the gaps with current work in the area of reprioritization/prioritization. The systematic literature survey is conducted by querying bibliographic databases and finally extracting out mean- ingful papers from the list.
The guidelines for performing systematic literature sur- vey as disseminated in Kitchenham and Charters (2007) are followed to perform literature survey. The below mentioned subsections describe the process.
Fig. 1 Reprioritization framework
Page 5 of 15Gupta et al. SpringerPlus (2015) 4:539
Research method The review of literature analyzes current trends in the process of requirement reprioritization and focuses on open research issues in this area.
To analyze the literature, the following digital libraries/ databases are searched against the following query string i.e. “reprioritization of requirements” on 15th August, 2014.
• IEEE Xplore. • Springer Link. • Science Direct. • ACM Digital Library. • Taylor and Francisco. • Wiley Online Library.
The triggering of the above databases with this bigger string is because some researchers use prioritization and reprioritizations terms interchangeably.
The trigger of the databases against above mentioned string yielded total 618 research papers with few repeti- tions in the set. The majority of the papers does not cover the area of reprioritizations, and thus are not capable of answering any of the formulated research questions.
The final number of papers was only 09, after analy- sis of research paper titles, keywords, abstracts and full texts.
The number of papers extracted from each biblio- graphic database is given in Table 1. Analysis was carried out considering the Table 2. This set was reduced to 06 after the removal of repetitive papers in the bibliographic databases (Table 1).
The final set of obtained papers is subjected to analy- sis. The series of pruning of research papers is illustrated with the help of Fig. 2.
In this figure, the label “a” denotes the transformation applied on the collected papers after analysis of abstracts, keywords and the text. Label “b” removes duplicates, “c”
analysis the references as reported in the papers left after process labelled “b” i.e. duplicates finally removed.
Details of extracted papers The systematic literature survey yielded six papers. Three more related papers, which were not identified at the time of survey due to non-indexing in bibliographic data- bases at the time of literature search, are also included for necessary analysis. Among these three papers, two papers were related to reprioritization techniques, third one is related to case study results of prioritization and reprioritization practices. This paper will consider all these papers as extracted papers in upcoming sections. The details of extracted papers are as given below:
The authors (Racheva et al. 2008) identified the main players of the prioritization process and various prob- lems that confront it. In order to meet the above goals, the literature is searched for various requirements of the prioritization models that are employed in agile software developments. After the analysis of the collected infor- mation, the factors that are considered by the clients and those that affect various types of decision making like Business Values, project constraints, learning dur- ing project, effort estimation etc. during requirement
Table 1 Papers selected after process “a”
Bibliographic databases
Papers selected after process “a”
Repeated papers
1. Science Direct 01 01 (available in ACM also)
2. IEEE Xplore 02 01 (available in ACM also)
3. ACM Digital Library
05 03 (one each with IEEE, Springer and Science Direct)
4. Springer Link 01 01 (available in ACM also)
5. Wiley 00 None found answering any of the four research questions
6. Taylor & Francisco 00 None found answering any of the four research questions
Table 2 Inclusion and exclusion criteria
Inclusion criteria Exclusion criteria
1. The papers must be answering at least one research question
2. Papers related to reprioritization alone
3. Papers (both short and long) related to the case study, review (if any), methods, tools and tech- niques of the reprioritization
1. Papers unable to answer any research question
2. Papers related to prioritization 3. Papers related to some other
area like prioritization with small proportions (like paragraphs) related to reprioritization, excep- tion being the above papers that discuss new methods, techniques etc. related to reprioritization
Selection Phase
202
70
02
a
618
09
06
06
145
117
Search Phase 1
IEEE Xplore
ACM Digital Library
Science Direct
Springer Link
Taylor & Francisco
Wiley Online
82
b
c
Fig. 2 Search process for literature survey
Page 6 of 15Gupta et al. SpringerPlus (2015) 4:539
reprioritizations are identified and presented in the form of conceptual models.
Finally the various prioritization issues are identified and presented with the suitable solutions. Some of the issues addressed are:
a. The authors stressed on the fact that how will the Business Value for each requirement be computed. Possible suggested solutions include weight allot- ments, consideration of dependencies, modelling of criteria, need of current implementation.
b. Another issue is that it might be impossible to com- pute Business Value for few requirements. Possible solutions include: (1) relating such requirements to those that create maximum Business Values (2) con- sidering the time dependency criteria between such requirements.
c. Third issue relates to quantity related requirements. For such requirements, the computation of the Busi- ness Values would be quite difficult since they cannot be separated for other requirements. By considering quality requirements as functional ones, one could be able to target this problem.
d. The fourth issue relates to dynamism in Business Values. Such values change for each increment, so a method should be there to compute the new value of the requirement by considering variations in Busi- ness Values.
e. Another issue related to the decision is the selection of an appropriate prioritization techniques. In other words, how a software engineer chooses suitable requirement prioritization techniques among the list of many techniques? Solutions include the considera- tion of various criteria, like number of requirements, stakeholders, volatility levels etc.
f. The decision regarding setting of the scope of next increment is also one of the issues related to reprior- itizations.
In their paper, Racheva et al. (2010a), tried to find answer of the research question, “What are the key con- cepts to consider when prioritizing the requirements from clients perspectives in agile projects”? The vari- ous factors affecting and guiding the clients during per- forming reprioritizations related decisions are identified by analysis of the analysis of literature. Various agile journals and digital libraries like IEEEXplore, ACM, Google Scholar, Interscience, Citeseer, Agile Journal, Dr. Dobb’s and InfoQ methods are searched and the cita- tions are also used as the source. The results were ana- lyzed through the abstracts and conclusions leading to the selection of 42 papers. It was found after analysis of these papers that total 22 of them highlight requirement
of prioritization techniques. The application of Grounder Theory (GT) yielded various findings that were illus- trated graphically with the help of two conceptual models denoted by A and B.
Model A gives the course grained description of the reprioritization of requirements in agile developments for successive increments. For each increment, the requirements are reprioritized and then few of them with higher priority are selected for the current implementa- tion in the sprint. Sprint backlog does not encounter update during particular sprint while it might be possible that developers are able to implement few requirements of the sprint backlog. These pending requirements are then added back to prioritized product backlog. The new requirements might arrive and update the above backlog, this backlog is then reprioritized and the same process is repeated until all increments are delivered.
Model B gives the fine grained description of the deci- sion making that happens during reprioritization. It highlights the various factors that are considered by the clients during taking decisions regarding reprioritization. The authors reported that Business Values, risks, effort or size, learning experience and external changes are five aspects employed during reprioritization.
Business Values are estimated for all requirements by the clients. Negative values or penalties, importance or relative importance are also considered as Business Values. Risks or uncertainties are also considered dur- ing reprioritization decision making. Risks, costs and requirement size are computed by developers, but con- sidered by clients that work in consultation with the developers.
Project constraints include release dates, budget, veloc- ity etc. Only those requirements are implemented that satisfy the current resources held by developing firms. Learning is the main activity in agile software develop- ments which happens at both individual and on team levels. External environment encounters change due to which the requirement priorities also change. Few of the examples includes competitor’s activities, change in user needs, business rules etc.
Racheva et al. (2010b) presented the conceptual model of reprioritization. It highlights the course grained description of decision making that happens at inter iteration time. The questionnaires followed by interviews with total 11 agile software development participants, i.e. project managers, developers, product owners, clients and scrum masters. The case studies of 10 projects were considered during the interviews of these experts.
Bakalova et al. (2011) tried to answer the following research question, “Which concepts of agile prioriti- zation are shared in practice and in literature, and how are they used to provide guidance for prioritization”. The
Page 7 of 15Gupta et al. SpringerPlus (2015) 4:539
authors tried to analyze the gaps between the current trends in reprioritization as described in the literature and those described in real life software developments in agile components. The conceptual model suggests that there are seven aspects which are considered by the cli- ents while making reprioritization decisions. The con- ceptual models are slightly modified after the further insights brought by the participants and dependencies were finally added as the seventh aspect. To analyze the gaps, the concepts created as a result of multiple agile case studies, are searched in the description of require- ment prioritization methods identified through literature surveys. If the concepts are missing from requirement prioritization techniques, it means that literature does not adapt well to the current industrial settings. To ana- lyze the above information, the results fetched after a search in the requirement prioritization descriptions is organized in the form of a table. Analysis of this table is reported by the authors as follows:
a. Existing requirement prioritization techniques pro- vide the descriptions at every course grained level, i.e. descriptions are not in detailed fashion.
b. Existing techniques do not employ all the concepts as identified by the authors through multiple case stud- ies.
c. Existing techniques do not give a detailed description of how to perform prioritization, or the information about factors affecting decision aspects, and stake- holders to be involved etc.
Daneva et al. (2013) carried out a survey to uncover different aspects related to the process of prioritization at inter iteration time, i.e. reprioritization. The survey was conducted in the form of interviews with the people working on live large agile projects, which the authors had termed as Alpha, Beta and Gamma. The main find- ings of the paper (only those related to answering of the research questions as formulated in the paper) are as given below:
a. The organizations employ Business Values, Require- ment Dependencies, Volatility, Risk, Effort, and Technical Debt as the criteria for reprioritization.
b. Maturity of the organization, the way domain knowl- edge is shared, and the use of delivery stories are rec- ognised as factors responsible for affecting the man- ner the reprioritization is carried out.
The paper has not discussed any method for perform- ing reprioritization but has explored concepts related to the reprioritization practices in large scale projects. The discussions with project practitioners discussing the
typical roles on client and vendor side and prioritization criteria gives little picture of reprioritization process as adopted in the firms. This may partially answer our sec- ond research question, yet our aim was to explore the method in great detail. Further, the paper also proves that the firms do not prioritize/reprioritize the decision aspects as employed during reprioritization. This answers our research question number 4.
Kukreja and Boehm (2013) proposed a two step pri- oritization model that is capable of performing prioriti- zation and reprioritization. It involves prioritization of business goals followed by decomposition of software into Minimal Marketable Features (MMFs) which are further prioritized with respect to prioritized goals. Each MMF is decomposed into requirements; requirements are stated as Win conditions and are further prioritized. Reprioritization involves just changing priorities of MMFs as priorities of Win conditions will automatically change as per change in priority of parent MMF. The process model is not evaluated on mass market live soft- ware and thus makes it hard to determine that how much improvement it will yield if employed for reprioritiza- tion with flood of requirements. So, this paper will not be considered as a model provided for mass market devel- opments. But it provides answers to first two research questions of this paper.
Gupta et al. (2014b) had given the results of the sur- vey that was conducted with few multinational software development organizations. The survey results revealed that the organizations agreed to the fact that it is not the decision aspects, but the requirements which area asso- ciated with ever changing priorities, i.e. decision aspects were not considered as candidates for reprioritization because decision aspect prioritization was considered an unheard-of phenomenon. Organizations wanted a cost effective solution for performing reprioritization to stay in markets offering less costly products.
Gupta et al. (2013) proposed a multilayered dynamic approach for performing reprioritization. The technique handles a different category of requirements differently. For example, the paper uses “Average Density” to repri- oritize delayed requirements. New and changed require- ments are handled in a different manner. This technique is demonstrated with the help of live system of the Library Management Software and is suitable for both agile and non agile developments. But the techniques based on pairwise comparisons are exceptions and this technique may not be able to handle reprioritization of pairwise compared requirements beyond some threshold value.
Gupta et al. (2014a) handled the problem of the inabil- ity of reprioritization methods to reprioritize pairwise compared requirements. The technique employs the
Page 8 of 15Gupta et al. SpringerPlus (2015) 4:539
numerical assignment technique to quickly prioritize the available requirements (denoted with set R) and perform- ing pairwise comparison among fewer requirements of set R and all newly emerged and changed requirements. The technique is evaluated on a real case study of the “Tool for automatic analysis and comparison of differ- ent release planning methods”. Results proved that the technique had good coverage on the entire set of require- ments and establishes priorities using minimum number of pairwise comparisons.
The papers as disseminated by authors in Racheva et al. (2008, 2010a, b), Bakalova et al. (2011), Daneva et al. (2013) give conceptual models and do not provide any method to perform reprioritization, while those dissemi- nated in Kukreja and Boehm (2013), Gupta et al. (2013, 2014a), present new reprioritization techniques.
The papers related to conceptual models are analysed in Table 3 and papers related to new reprioritization techniques are analysed in Table 4.
Synthesis of literature findings The papers extracted from literature are discussed in previous section and summarized in Tables 3 and 4. The extraction must be synthesized so as to generate answers to the four research questions (“Research questions”).
RQ 1. How is the area of reprioritization treated with respect to the area of prioritization?
All the extracted papers are related to reprioriti- zation activity, with few giving conceptual mod- els and the remaining presenting new techniques. Conceptual models and new techniques establish the difference between reprioritization and pri- oritization. The papers given in Table 3 do not highlight the problems that confront the repri-
oritization activities. Possible unidentified prob- lems could be as follows:
• The conceptual models are silent on considering already prioritized requirements for reprioritiza- tion. Gupta et al. (2012b) reported that there is a direct impact between requirement prioritization and regression testing. To achieve the objective of lesser costs attributable to minimization of regres- sion testing, the requirement priorities should reflect the current market trends.
• The conceptual models are silent on reprioritization involving a change in priorities of decision aspects. This is due to the finding of Gupta et al. (2014a) that decision aspects are subjected to reprioritiza- tion to have accuracy in implementation set of the requirements.
• Reprioritization should focus on the views of devel- opers as many non functional requirements are better prioritized by the developers rather than the clients. Svensson et al. (2011), after the analysis of eleven software developing firms, reported that pri- oritization of quality requirements are a neglected activity. Quality requirements are taken as low pri- ority requirements and the main stress is on imple- menting functional ones.
• The reprioritization techniques must focus on min- imizing the reprioritization efforts. An increase in the efforts mean increase in delivery time and costs. An increase in the values of these parameters is not acceptable in either bespoke and market driven developments. The reprioritization techniques have to execute on the larger set of inputs, than those operated in earlier increment. The reprioritization process should be able to handle large number of
Table 3 Literature work of papers related to conceptual models
S. no. Paper reference Findings and deliverable
1. Racheva et al. (2008) The paper identified various issues in prioritization; factors governing and influencing the client’s decision making during reprioritization are presented. Few solution strategies are also given by the authors
2. Racheva et al. (2010a) Conceptual model of reprioritization is built on the basis of survey of literature. Factors influencing the reprioritization decision making are identified and is considered as a refined form of those identified earlier
3. Racheva et al. (2010b) The conceptual model as created above is further refined as a result of interactions with the industry participants. This is because of the insights brought by the software development firms
4. Bakalova et al. (2011) The conceptual models as created above are further refined as a result of more series of interviews with software development firms. “Dependencies” was the new factor to be added. These conceptual models are considered true reflections of industrial practices. The seven identified factors are searched in the prioritization description in literature to identify gaps. These gaps provide future directions for research work
5. Daneva et al. (2013) Carried out a survey to uncover different aspects related to the process of prioritization at inter iteration time, i.e. reprioritization. This paper identified the different roles as played by different people at client and vendor side, reprioritization criteria’s adopted, factors affecting manner reprioritization is carried out
Page 9 of 15Gupta et al. SpringerPlus (2015) 4:539
Ta bl
e 4
Li te
ra tu
re w
or k
of p
ap er
s pr
es en
ti ng
n ew
re pr
io ri
ti za
ti on
te ch
ni qu
e an
d ca
se s
tu di
es
S. n
o. Pa
pe r r
ef er
en ce
Fi nd
in gs
a nd
d el
iv er
ab le
Fu tu
re w
or k/
lim ita
tio ns
1. G
up ta
e t a
l. (2
01 4b
) D
ec is
io n
as pe
ct s
re pr
io rit
iz at
io n
is n
ot u
nd er
ta ke
n by
o rg
an iz
at io
ns , b
ut th
ey d
o re
co gn
iz e
th e
ne ed
fo r h
an dl
in g
re qu
ire m
en ts
. S ta
yi ng
in m
ar ke
ts b
y re
du ci
ng
th e
de ve
lo pm
en t e
ffo rt
s (e
sp ec
ia lly
ti m
e an
d co
st ) i
s on
e of
th e
cr ite
ria th
at
m ak
e th
em re
lu ct
an t f
or re
pr io
rit iz
in g
al re
ad y
pr io
rit iz
ed re
qu ire
m en
ts . T
hi s
ai m
s to
g et
in si
gh t i
nt o
pr io
rit iz
at io
n an
d re
pr io
rit iz
at io
n of
b ot
h de
ci si
on a
sp ec
ts a
nd
re qu
ire m
en ts
. U pd
at ed
d oc
um en
ta tio
n is
a no
th er
fi nd
in g
of th
e ca
se s
tu dy
Th e
ar ea
o f r
ep rio
rit iz
at io
n is
e xp
lo re
d to
fi ne
r l ev
el s
by in
te ra
ct io
ns w
ith o
rg an
iz a-
tio ns
th at
h ad
b ee
n us
in g
ag ile
a nd
n on
a gi
le m
od el
s fro
m th
e tim
e si
nc e
ba ck
. Th
e in
te ra
ct io
ns s
ho ul
d on
ly fo
cu s
ar ou
nd re
pr io
rit iz
at io
n A
lth ou
gh th
e pr
es en
te d
ca se
s tu
dy h
ad b
ee n
do ne
w ith
m as
s m
ar ke
t s of
tw ar
e de
ve lo
pm en
t o rg
an iz
at io
ns a
nd h
ad fl
av ou
re d
th e
ta st
es o
f b ot
h ag
ile a
s w
el l a
s no
n ag
ile s
of tw
ar e
de ve
lo pm
en ts
2. G
up ta
e t a
l. (2
01 3)
Te ch
ni qu
e fo
r p er
fo rm
in g
re pr
io rit
iz at
io n
of n
ew , c
ha ng
ed a
nd d
el ay
ed re
qu ire
- m
en ts
N ot
e va
lu at
ed o
n re
al c
as e
st ud
ie s
M ay
n ot
b e
su ita
bl e
fo r r
ep rio
rit iz
at io
n of
p ai
rw is
e co
m pa
ris on
b as
ed re
qu ire
- m
en ts
b ey
on d
so m
e va
lu e
of a
n um
be r o
f r eq
ui re
m en
ts
3. G
up ta
e t a
l. (2
01 4a
) Te
ch ni
qu e
to p
er fo
rm re
pr io
rit iz
at io
n of
p ai
rw is
e co
m pa
re d
re qu
ire m
en ts
w ith
m
in im
al e
ffo rt
s It
ha s
go od
c ov
er ag
e of
re qu
ire m
en t s
et a
nd in
vo lv
es m
in im
al p
ai rw
is e
co m
pa ri-
so ns
Sh ou
ld b
e ex
te nd
ed to
re pr
io rit
iz e
de ci
si on
a sp
ec ts
Sh ou
ld b
e ex
ec ut
ed o
n ev
ol ut
io na
ry s
of tw
ar e
w ith
th ou
sa nd
s of
re qu
ire m
en ts
an
d co
nt in
uo us
fl oo
d of
re qu
ire m
en ts
4. Ku
kr ej
a an
d Bo
eh m
(2 01
3) Th
is p
ap er
p ro
vi de
s a
tw o
st ep
p ro
ce ss
m od
el fo
r p er
fo rm
in g
pr io
rit iz
at io
n an
d re
pr io
rit iz
at io
n. R
ep rio
rit iz
at io
n is
fa ci
lit at
ed b
y au
to m
at ic
re -c
om pu
ta tio
n of
re
qu ire
m en
t p rio
rit ie
s by
c ha
ng in
g th
e pr
io rit
ie s
of p
ar en
t M M
F as
p er
c ha
ng in
g bu
si ne
ss e
nv iro
nm en
t
Te ch
ni qu
es n
ot e
va lu
at ed
o n
re al
m as
s m
ar ke
t s itu
at io
ns li
ke e
ve r i
nc re
as in
g re
qu ire
m en
ts , a
sp ec
ts a
nd s
ta ke
ho ld
er s
Page 10 of 15Gupta et al. SpringerPlus (2015) 4:539
requirements with minimal efforts, i.e. free from scalability problem.
• There are no guidelines/results that could help in decision making for selection of particular prioriti- zation technique for performing reprioritization.
The remaining papers (given in Table 4) present repri- oritization techniques that need to be evaluated on real software so that their response against large requirement sets and large number of clients could be evaluated.
RQ 2. How is reprioritization carried out by mass mar- ket software industries?
Table 3 shows the generic process for perform- ing reprioritization without reference to the mass market development. The reference to mass market situations, large stakeholders, require- ments etc. are missing for the models. Table 4 gives generic techniques for performing repri- oritization which may or may not be applicable for mass market developments after numbers of increments. In Gupta et al. (2014a) and Kukreja and Boehm (2013) are the two techniques evalu- ated on real software but not at higher values of requirements. These techniques can be consid- ered as mass market techniques with the require- ment of stronger evaluations at higher values of inputs. The techniques as given by Gupta et al. (2014a) and Kukreja and Boehm (2013) were based on performing reprioritization with an aim of minimization of parameter like efforts.
RQ 3. How do the current reprioritization activities handle flood of requirements in mass market development situations?
Gupta et al. (2014a) and Kukreja and Boehm (2013) could be considered as mass market tech- niques but need strong evaluations. The authors
of both the papers have not discussed that how their techniques are well acceptable against flood of requirements.
RQ 4. How is the dynamism in the priorities of decision aspects handled in mass market developments?
None of the technique relates itself with repri- oritization of decision aspects. The techniques are specially mentioned for requirements and their applicability for reprioritization of deci- sion aspects is still an unaddressed issue. Hence the literature survey is unable to reveal any work related to reprioritization of decision aspects.
The Overall literature lacks reprioritization methods. The work that could be identified in the literature does not get mapped to the practical realities of mass market developments like large requirements, stakeholders and aspects. The above synthesized observations are pre- sented in Table 5. Table 5 excludes the case study work given in Gupta et al. (2014b) because it does not provide any new reprioritization technique.
Reprioritization survey results The objective of performing the case study is to deeply consider the practices of the software developing organi- zations from the perspective of reprioritization alone. The interviews were conducted with the software engi- neers of Eight Multinational software development companies. The interviews were conducted face to face through personnel meetings.
The researchers respect the privacy terms of the industries agreed upon at the time of interview and the information is shared in such a manner that it does not disclose their identities.
All the eight companies are reputed software organi- zations with development centres and customer bases almost all over the world. Most of these organizations
Table 5 Synthesis of literature survey finding
S. no. Paper references New reprioritization proposal Establishes rep- rioritization vs prioritizationRequirements Decision
aspects Based on mass market
Based on parameter minimization
1. Gupta et al. (2013) No No No No Yes
2. Gupta et al. (2014a) Yes No Yes Yes Yes
3. Racheva et al. (2008) No No No No Yes
4. Racheva et al. (2010a) No No No No Yes
5. Racheva et al. (2010b) No No No No Yes
6. Bakalova et al. (2011) No No No No Yes
7. Daneva et al. (2013) No No No No Yes
8. Kukreja and Boehm (2013) Yes No Yes Yes Yes
Page 11 of 15Gupta et al. SpringerPlus (2015) 4:539
have many branches not only in different parts of world but India as well.
Most of the companies have higher average annual return and 10,000+ employs in single Indian site. Many of the employees are, as reported by the interviewed pro- fessionals, software engineers.
A number of software engineers, who were inter- viewed, had worked on sufficient number of projects at various levels. Abstract details per organization are as given in Table 6.
The interviews were aimed to gain insights into mass market incremental software development process by focussing on prioritization and reprioritization practices. During the interviews, the authors focused on prioritiza- tion practices, because the industry uses some other ter- minology that stands for something else in literature. To be in a better position to answer RQ 1, it was felt better to let industry representatives answer questions for both prioritization and reprioritization.
RQ 1. How is the area of reprioritization treated with respect to the area of prioritization?
The interview sessions revealed that organiza- tions are using prioritization practices. It means that the reprioritization is seen similar to prior- itization. The organizations are performing pri- oritizations, i.e. allotting values of priorities to new and changed requirements only so that the whole process may reduce costs, time and effort.
This will be treated as parameter based prioriti- zation and not reprioritization.
RQ 2. How is reprioritization carried out by mass mar- ket software industries?
As both prioritization and reprioritization are seen similar thus the only way to know how it is performed is just by looking at the manner the software industries re-prioritizes backlog and requirements prioritized earlier.
The organizations do not reprioritizes previously prioritized requirements and the main stress is on changed and new requirements. The chances of a backlog item getting into implementation is rare, if it happens then it is only the compliance with Business Values and some guess work that does the job for software engineer. The organiza- tions are carrying out prioritizations and not rep- rioritizations.
RQ 3. How does the current reprioritization activities handle flood of requirements in mass market development situations?
Organizations do not have method to prioritize and even reprioritize flood of requirements. When talked about flood of requirements, most of them replied that “Short sprints make them possible to handle large number of requirements”. It is again the compliance with Business Values
Table 6 Multinational organization details
S. no. Organization Reprioritization techniques
Software engineers employed
Interviewed engineers
Engineers’ characteristics
1. A 10,000+ 07 Experience of working for the development of many projects at current and some other organizations performing roles and responsibilities. Higher level engineers were also involved
2. B 10,000+ 04 Experience of working for the development of many projects at current and some other organizations performing roles and responsibilities. Higher level engineers were also involved
3. C 10,000+ 03 Experience of working for the development of many projects at current and some other organizations performing roles and responsibilities. Higher level engineers were also involved
4. D 6000+ 02 Experience of working for the development of many projects at current and some other organizations performing roles and responsibilities. Higher level engineers were also involved
5. E 400–600 02 Experience of working for the development of many projects at current and some other organizations performing roles and responsibilities. Higher level engineers were also involved
6. F 400–600 01 Experience of working on many consultancy based projects; typically those which require small team sizes
7. G 200–400 02 Intermediate experience with software development projects
8. H 500–1000 01 Experience of working on many consultancy based projects; typically those which require small team sizes
Page 12 of 15Gupta et al. SpringerPlus (2015) 4:539
and some guess work that makes software engi- neer to select highest priority requirements.
RQ 4. How is the dynamism in the priorities of decision aspects handled in mass market developments?
Decision aspects are fixed and neither are the priorities allotted nor changed. Decision aspects does not update it with the passage of time. They are not reprioritized. The organizations employ Business Values, stresses on reusability and con- sider advice of developers, i.e. the guess work of developers, which is consistent with the finding of Gupta et al. (2014b). Decision aspects are nei- ther prioritised not reprioritized. So the question of the updation of decision aspect does not arise.
The Interview findings are summarised in Table 7. The interactions with the industry personnel gave addi-
tional insights as mentioned below:
• The industries have a fixed small customer base. The advice of such customer base (representation of market trends) is taken during development of each increment of software. Mass market developments suffer from the problem of unknown customer base. The organization does not have any stakeholder iden- tification technique.
• The organizations do not have any limited value of the number of requirements that could be best served by the prioritization techniques. During interactions, the authors aimed to know that even as organiza- tions employ prioritizations, do they feel some value of the number of requirements as “unmanageable”? Such a number may give some threshold value, up to which the prioritization finds its place for reprioriti- zation. Averaging such values obtained from different companies help to even know better the threshold. Unfortunately such a relation could not been derived.
Comparative results of literature survey and case studies The findings of the interview sessions (Table 7) reveal the same situation as revealed by literature findings (Table 5) except for RQ 1, the software industry is in dire need since any mistake or use of some weak practices may wipe out a company from the competitive market. In market customer satisfaction matters can be mapped directly to their requirements; indirectly to unstated requirements like quality requirements and definitely delivery time and cost. The comparative analysis is mapped to different research questions below and sum- marized in Table 8.
RQ 1. How is the area of reprioritization treated with respect to the area of prioritization?
The literature has limited papers available on rep- rioritization. Comparison of Figs. 1 and 2 shows the limited work is going in the area of reprioriti- zation. Although to a limited degree, the available papers establish prioritization VS reprioritiza- tion situation, i.e. at least positions reprioritiza- tion in separate position than prioritization. The interview sessions revealed that organizations employ prioritization techniques for ranking new and changed requirements only throughout the life cycle of the software. Limiting the set of requirements (being limited to new and changed only) make ranking somewhat manageable but the priorities of other requirements will remain outdated. The organizations are afraid of employ- ing requirement priorities during phases like regression testing. The guess work will result in investment of large costs since costs need to be invested in providing better customer feedback support, incorporation of feedbacks and no opti- mization in priority based activities like regres- sion testing.
Table 7 Interview sessions findings
S. no. Organization Reprioritization techniques
Requirements flood
Decision aspects
Based on mass market
Based on parameter minimization
1 A No No Not exactly Satisfaction of Business Values
2 B No No Not exactly Satisfaction of Business Values
3 C No No Not exactly Satisfaction of Business Values
4 D No No Not exactly Satisfaction of Business Values
5 E No No Not exactly Satisfaction of Business Values
6 F No No Not exactly Satisfaction of Business Values
7 G No No Not exactly Satisfaction of Business Values
8 H No No Not exactly Satisfaction of Business Values
Page 13 of 15Gupta et al. SpringerPlus (2015) 4:539
RQ 2. How is reprioritization carried out by mass-mar- ket software industries?
The organizations consider only new and changed requirements during development of each increment. Such requirements are ranked by using Business Values, reusability, minimiza- tion of cost and time and some other guess work by developers. Literature provides, with limited reprioritization, techniques that needs evalua- tion on large number of requirements against changing aspects. These techniques provide good solution up to number of requirements and the performance drastically degrades thereafter. Neither the literature nor the industries have sound technique for identification of stakehold- ers that are identified mostly in later increments during incremental mass market developments. Both the literature and industry lack the sound and trustworthy reprioritization techniques that could work well in mass markets. Industrial prac- tices are prioritization based while techniques available in literature have still to prove the ability to work with large numbers.
RQ 3. How the current reprioritization activities handle flood of requirements in mass market develop- ment situations?
Industrial practices are prioritization based while techniques available in literature have still to prove the ability to work with large numbers. In case of industry, prioritization is based on guess- work and fixed aspects. Mistakes done could be corrected in next sprint as per almost all indus- try recipients. In case of literature, the available
techniques have to prove the ability on flood of requirements.
RQ 4. How is the dynamism in the priorities of decision aspects handled in mass market developments?
Industry prioritization practices are based on fixed aspects while reprioritization practices do not provide any discussion of whether they could be applied on reprioritization of aspects as well. Decision aspects are neither prioritized nor rep- rioritized in industry while literature techniques need evaluation when aspects of reprioritization are to be validated.
Conclusion and future work The area of reprioritization is new and unexplored area that lacks research addressing the ways of performing this activity with minimal efforts. We consider the reason for the limited research the lack of papers that better posi- tions this activity apart from prioritization. The same evi- dence came from the comparison of the literature survey findings for 2 years, i.e. 2012 and 2014 (Figs. 1, 2), done using the same string, i.e. “reprioritization of require- ments” against same bibliographic databases. Compari- son of the Figs. 2 and 3 shows that even after 2 years, the number of papers related to the area of reprioritization has not grown very much (just 3 papers). The papers pro- duced are negligible in number when compared to the papers published in other areas.
This paper aims to provide the research community a convincing arguments in order to make research reprior- itization oriented. The limited research in this area is col- lected through systematic literature surveys and analyzed to gain better understanding of the area.
Table 8 Comparison of literature work and interview session findings
a Reprioritization is simply prioritization in case of organizations. So it will be better if it is called parameter minimization based prioritization b As discussed earlier, consideration of the mass market is only partial c Limited techniques are available. This represents the need for further research in the area
S. no. Parameter of interest (availability) Interview sessions findings
Literature survey findings
Whether finding consistent with from literature findings
1 Identification of stakeholders No No Yes
2 Sound reprioritization techniques No No Yes
3 Decision aspect reprioritization No No Yes
4 Parameter minimization based reprioritization techniques
Noa Yesc Yes
5 Mass market based reprioritization Nob Yesc Yes
6 Reprioritization of already prioritized, changed, backlog and new requirements
No Yesc Yes
7 Applicability of prioritization technique for reprioritization
No No No
Page 14 of 15Gupta et al. SpringerPlus (2015) 4:539
The paper discusses the results of the interactions done with software development firms that aim to get deeper into the area of reprioritization alone. The findings of the interactions are compared to those of analyzed through literature findings. The comparison shows similarities which provide convincing arguments for conducting more research in this area. The problems which have been identified are similar to those which have been col- lected through by Gupta et al. (2013) but the figures and understandings as presented in this paper are detailed and highlight things minutely, because the survey and interactions are only focussed on reprioritization.
The overall analysis of this paper gives new directions to future research that addresses the following:
• Efficient reprioritization methods capable of han- dling large number of aspects and requirements with minimal efforts are the need of the hour. Efficiency means that reprioritization should also minimize the parameters like cost, time and efforts etc. A large number of aspects and requirements mean that the technique should be capable of working in mass- market development scenarios.
• Effective identification of stakeholders is important thing to be done in mass-market development, as the actual customer base is unknown in beginning incre- ments. Better, the customer base better is the devel- opment. Effective identification is not there in the practices of the organization.
• The applicability of existing prioritization methods during reprioritization is an unaddressed issue.
• Evaluation of effective reprioritization methods on real mass market case study in the near future, encouraging the organizations to invest more efforts to minimize burden on reprioritizations and mini- mizing prioritization efforts during reprioritizations.
• Overall impact analysis of reprioritization techniques on time, cost and quality of software incremental and overall development is interesting to watch.
The practices of organizations are not effective enough to handle the dynamism in mass market developments especially failing in proper selection of stakeholders, handling changing priorities associated with decision aspects and large number of requirements. They cannot depend on available literature as literature also provides limited and partially validated support in the area of reprioritization.
Much more evidence came from the comparison of the literature survey findings for 2 years, i.e. 2012 and 2014, done using the same string, i.e. reprioritization of requirements against the same bibliographic databases.
Authors’ contributions All the authors of this paper have equally contributed to this paper. All authors read and approved the final manuscript.
Author details 1 Department of Computer Science and Engineering, National Institute of Technology, Hamirpur, India. 2 GLA University, Mathura, India.
Acknowledgements The authors are thankful to the representatives of the software development companies that participated in the interview sessions. They put great efforts in explaining the industrial practices by overcoming the barriers of multiple meanings of the same terms used both in industries and literature.
Compliance with ethical guidelines
Competing interests The authors declare that they have no competing interests.
Received: 6 May 2015 Accepted: 7 September 2015
References Achimugu P, Selamat A, Ibrahim R, Mahrin M (2014) A systematic literature
review of software requirements prioritization research. Inf Softw Technol 56:568–585
Ahl V (2005) An experimental comparison of five prioritization methods. Master’s Thesis, School of Engineering, Blekinge Institute of Technology, Ronneby, Sweden
Allen L, Grigsby T, Jenkins J, Miller S (2010) Automated dynamic reprioritization of presentation materials. Patent Number: US 20100309436 A1
Bakalova Z, Daneva M, Herrmann A, Wieringa R (2011) Agile requirements pri- oritization: what happens in practice and what is described in literature. In: 17th international working conference on Requirements engineering: foundation for software quality
Annexure-1
Selection Phase
23
53
02
a
367
05
04
04
24
08
Search Phase 1
IEEE Xplore
ACM Digital Library
Science Direct
Springer Link
Taylor & Francisco
Wiley Online
59
b
c
Fig. 3 Search process for literature survey for the year 2012. Com- parison of the Figs. 2 and 3 shows that even after 2 years, the number of papers related to this area of reprioritization has not grown too much (just 3 papers).The papers produced are negligible in number as compared to the papers published in other areas. This shows the negligence and lack of research in this important area
Page 15 of 15Gupta et al. SpringerPlus (2015) 4:539
Berander P (2007) Evolving Prioritization For Software Product Management. Blekinge Institute of Technology, Ph.D. Thesis
Budnik C, Subramanyan R (2013) Dynamic reprioritization of test cases during test execution. Patent Number: US 20130159774 A1
Carmel E, Becker S (1995) A process model for packaged software develop- ment. IEEE Trans Eng Manag 42(1):50–60
Dahlstedt ÅG, Karlsson L, Persson A, Dag JN, Regnell B (2003) Market-driven requirements engineering processes for software products—a report on current practices. In: International Workshop on COTS and Product Software: Why Requirements Are So Important (RECOTS)
Daneva M, Veen E, Amrit C, Ghaisas S, Sikkel K, Kumar R, Ajmeri N, Ramteerthkar U, Wieringa R (2013) Agile requirements prioritization in large-scale outsourced system projects: an empirical study. J Syst Softw 86:1333–1353
Gupta V, Chauhan DS, Dutta K (2012a) Hybrid decision aspect prioritization technique for globally distributed developments. Proc Eng 38:3614–3627. doi:10.1016/j.proeng.2012.06.418
Gupta V, Chauhan DS, Dutta K (2012b) Impact analysis of requirement prioritization on regression testing. AWER Proc Inf Technol Comput Sci 2:379–383
Gupta V, Chauhan DS, Dutta K, Gupta C (2013) Requirement reprioritization: a multilayered dynamic approach. Int J Softw Eng Appl 7(5):55–64
Gupta V, Chauhan DS, Dutta K (2014a) Requirement reprioritization for pairwise compared requirements. Int J Comput Aided Eng Technol 6(1):29–47
Gupta V, Chauhan DS, Gupta C, Dutta K (2014b) Current prioritization and reprioritization practices: a case study approach. Int J Comput Aided Eng Technol 6(2):159–170
Heldman K (2006) PMP: Project Management Professional Study Guide. Wiley Karlsson J (1996) Software requirements prioritizing. In: Second International
Conference on Requirements Engineering (ICRE’96) Karlsson J, Wohlin C, Regnell B (1998) An evaluation of methods for prioritizing
software requirements. Inf Softw Technol 39(14–15):939–947 Karlsson L, Dahlstedt Å, Dag J (2002) Challenges in market-driven require-
ments engineering—an industrial interview study. In: Eighth Interna- tional Workshop on Requirements Engineering: Foundation for Software Quality
Karlsson L, Berander P, Regnell B, Wohlin C (2004) Requirements prioritisation: an experiment on exhaustive pair-wise comparisons versus planning game partitioning. In: Proceedings of the 8th International Conference on Empirical Assessment in Software Engineering (EASE 2004). Edin- burgh, Scotland
Kitchenham B, Charters S (2007) Guidelines for performing systematic litera- ture reviews in software engineering, version 2.3. EBSE Technical Report EBSE-2007-01, Keele University and University of Durham
Kukreja N, Boehm B (2013) Integrating Collaborative Requirements negotia- tion and prioritization processes: a match made in heaven. In: 2013 International Conference on Software and System Process (ICSSP’13), USA, 2013, pp 141–145
Lehtola L, Kauppinen M (2006) Suitability of requirements prioritization meth- ods for market-driven software product development. Softw Process Improv Pract 11(1):7–19. doi:10.1002/spip.249
Lubars M, Potts C, Richter C (1993) A review of the state of the practice in requirements modelling. In: First IEEE International Symposium on Requirements Engineering (RE’93)
Perini A, Ricca F, Susi A (2009) Tool-supported requirements prioritization: com- paring the AHP and CBRank methods. Inf Softw Technol 51(6):1021–1032
Potts C (1995) Invented requirements and imagined customers: requirements engineering for off-the-shelf software. In: Second IEEE International Symposium on Requirements Engineering (RE’95)
Preston D (2012) Processing method for reprioritizing software application tasks. US 20120144402 A1
Racheva Z, Daneva M, Buglione L (2008) Supporting the Dynamic Rep- rioritization of Requirements in Agile Development of Software Products. In: Second International Workshop on Software Product Management(IWSPM’08)
Racheva Z, Daneva M, Herrmann A, Wieringa R (2010a) A conceptual model and process for client-driven agile requirements prioritization. In: 4th international conference on research challenges in information science (RCIS). doi:10.1109/RCIS.2010.5507388
Racheva Z, Daneva M, Herrmann A (2010b) A conceptual model of client- driven agile requirements prioritization: results of a case study. In: ACM- IEEE International Symposium on Empirical Software Engineering and Measurement
Ribeiro R, Moreira A, Broek P, Pimentel A (2011) Hybrid assessment method for software engineering decisions. Decis Support Syst 51:208–219
Salahuddin MA, Al-Fuqaha A, Jacquelin F, Shim Y (2013) Context severity based opportunistic service reprioritization for IEEE 802.11p VANETs. In: 9th International Wireless Communications and Mobile Computing Confer- ence (IWCMC)
Svensson R, Gorschek T, Regnell1 B, Torkar R, Shahrokni A, Feldt R, Aurum A (2011) Prioritization of Quality Requirements: State of Practice in Eleven Companies. In: 2011 IEEE 19th International Requirements Engineering Conference, pp 69–78
Voola P, Babu A (2013) Comparison of requirements prioritization techniques employing different scales of measurement. ACM SIGSOFT Softw Eng Notes 38(4):1–10
Yoo S, Harman M (2012) Regression testing minimisation, selection and prioritisation: a survey. Softw Test Verif Reliab 22(2):67–120. doi:10.1002/ stvr.430