Executive Summary
On September 13, 2018, excessive pressure in natural gas lines owned by Columbia Gas
caused a series of explosions and fires in Massachusetts's Merrimack Valley region. The system
over-pressure ultimately damaged 131 structures, hospitalized 21 individuals, and killed one
person. (National Transportation Safety Board, 2019) Columbia Gas of Massachusetts did not
offer any advisories, and police and firefighters were doing a better job evacuating people from
their homes. It ultimately left thousands of households displaced without heat or the ability to
cook for months and bankrupted Columbia Gas of Massachusetts.
Although the accident can be attributed – on face value - to technical errors, these errors
shine a light on more profound organizational complacency within Columbia Gas, not the least
of which involve a gap in good project management practice and responsibility. A thorough
investigation conducted by the NTSB provided many technical recommendations to Columbia
Gas. To protect against future disasters, however, changes must be made from the project
management perspective. The three top identified top issues are cost-cutting in safety efforts,
lack of coordination internally and with local governments, and a culture of complacency.
I will discuss how these three major issues led to the subsequent disaster, solutions, pros
and cons, and these two overall recommendations: adding safety to the performance criterion
for project managers and developing a precise emergency plan with routine drills.
Background
On September 13, 2018, excessive pressure in natural gas lines owned by Columbia Gas
caused a series of explosions and fires in Massachusetts's Merrimack Valley region. The system
over-pressure ultimately damaged 131 structures, hospitalized 21 individuals, and killed one
person. (National Transportation Safety Board, 2019) Columbia Gas of Massachusetts failed to
proactively communicate with the local population. The people of Merrimack Valley were
getting their news instead from the local law enforcement agencies. This disaster ultimately left
thousands of households displaced without heat or the ability to cook for months and bankrupted
Columbia Gas of Massachusetts.
The disaster's technical causes could be traced back to replacing aging cast iron gas pipes
with polyethylene pipes. Contractors followed the work package that Columbia gas developed
and approved. The contractors removed a length of pipe without the very important step of
disconnecting a pressure sensor that was still attached to the removed pipe section. The pressure
sensor began reading a pressure drop that opened valves in the gas network until they were open
completely. Alarms were triggered at NiSource, Columbia's parent company, in Ohio. However,
they had no remote control of the valves and could only respond in person, and by the time the
valves were shut and brought back in control, the damage had already been done. (Maltzman,
2020)
Although seemingly technical in nature, this disaster points to multiple systemic issues
linked to project managers' failures and top management at Columbia Gas. The three issues
discussed in this paper are cost-cutting in safety efforts, lack of coordination internally and
with local governments, and a culture of complacency.
Issues Identification
Issue 1 – Cost Cutting in Safety Efforts
Ironically, the modernization project that set off the disaster was to replace the old pipes
with newer, safer, polyethylene pipes. However, the mitigation of risk through this
modernization created a secondary risk that revealed cost-cutting measures that made the process
unsafe. As it is cheaper to hire a contractor to replace the pipes, Columbia Gas outsourced labor
on this project. (Penn, 2019) By engaging a third party, Columbia Gas would have less oversight
over the project with contractors working on an unfamiliar system. Furthermore, Columbia Gas
typically had a technician from the Meter and Regulation Department assigned to the site to
manage the pressure readings. This practice was ended four years ago. (Penn, 2019) Columbia
Gas did not provide any reasons for ending the procedure, but it seems evident that it is a cost-
cutting measure, undertaken (in the author’s opinion) without proper consideration of the
downside.
However, even if Columbia Gas were directly working on the project, the accident may
have still happened. The NTSB investigation revealed the work package was signed off by an
engineer-in-training, not a licensed professional engineer. The office working on the project only
had two licensed engineers, and they only dealt with signing off on more extensive projects,
which this pipeline replacement was not (National Transportation Safety Board, 2019). This
seems to be a workflow process problem – something a project manager should consider.
Finally, there was a lack of documentation of the sensors resulting in them being
excluded from the work package. Had the engineers had the resources to review and provide that
information to the construction workers diligently, they would have accounted for the regulator
sensing lines.
Issue 2 – lack of coordination
Had the significant increase in gas pressure been detected and promptly acted upon, the
damage would have been significantly reduced. The first alarm that warned of high pressure
went off at 3:57 pm. It was not until 4:30 pm that technicians arrived at the first regulator station
to cut off the high-pressure gas flow - and not until 7 pm later that evening that the high gas
pressure was brought back in control. The NTSB investigation showed that Columbia Gas was
not prepared to respond to the emergency. Their emergency documents did not provide clear and
actionable steps for responding to this large-scale emergency event. (National Transportation
Safety Board, 2019). Although not per se related to this particular project, the project manager
could ‘step up’ and question why a particular project does not have these emergency steps.
Furthermore, information was not provided to municipal governments and emergency
first responders. The NiSource Emergency Manual states that when an over-pressurization of the
system occurs, there "may be a need" to communicate with local government officials and
emergency management agencies as well as fire and police departments. Had firefighters and
police been given the actionable information in a timely fashion, evacuations and precautions
could have begun. This communication could have potentially prevented multiple injuries and
the single death that occurred. Further, better communications could have prevented the
embarrassing situation of leaving the Twitter feed posting the company receiving a safety award
rather than providing the local population with vital, urgent information about the disaster as it
unfolded.
Issue 3 – lack of safety culture
Massachusetts Department of Public Utilities provided documentation on enforcement
action against Columbia gas for the preceding five years. Many of the incidents show a history of
improper maintenance, documentation, and inspection of their gas lines.
In Columbia Gas' pursuit of higher profit, minimum resources were placed into making
sure the gas lines they operated could be as safe as possible. A lack of safety culture also reveals
a culture of complacency. This culture can be seen in their lack of thorough risk assessment and
planning for emergency events. Investment into classes and exercises for their on-site engineers
would have also made the response less hectic and more unified.
Furthermore, had safety been a higher priority, the planning process would have included
a thorough check for safety issues. At the time, Massachusetts' state did not require a
professional engineer to sign off on the project plans. Columbia gas, therefore, did the bare
minimum to be following regulatory guidelines. Had also safety been taken into account during
their review and planning process for modernizing their gas lines, the potentially deadly issue of
over-pressure would have come up and been a more significant part of the review process for the
construction plans. Again, although this is not the specific role of the PM, the PM can and
should be the person to highlight these issues to management.
Proposed Solutions Table
Issues # - Solution # Solution
1-1 Re-invest in safety heavily. Create an executive-level office to
advocate for safety across the entire company's operation. Use this new
people's power to conduct a thorough review of engineering and
planning processes to refocus on safety.
1-2 Add safety as a performance target criterion to protect against
sacrificing quality over budget and time constraints.
1-3 Modify company policy concerning project planning and review so that
it goes above and beyond the regulatory requirements set forth by the
government.
2-1 Develop a precise and thorough emergency action plan that includes
Columbia Gas, local governments, and emergency first responders.
Make sure different monitoring stations are adequately staffed so that
no one person is entirely swamped when an emergency incident occurs.
2-2 Plan routine drills that practice potential emergencies. Make sure that
emergency first responders are included. Conduct reviews of these
drills to see if there are any improvements to be made
2-3 Conduct a review of how different departments and regional offices
communicate with each other. Create a communications plan that
allows information, especially in an emergency, to be communicated
timely.
3-1 Create a company-wide safety program that educates people on safety
practices and standards that must be respected. Also, put in place a
mechanism to make sure violations are dealt with transparently and
timely.
3-2 Make training classes for new hires, especially in the technical
department, mandatory.
3-3 Bring in new board members, executive-level hires with extensive
experience working in organizations that focus on safety. Such as the
NTSB or OSHA.
Pros and Cons Matrix
Solution Pros Cons
1-1: Create
executive-level
office overseeing
safety
Does not add to current
employee's responsibilities.
Dedicated teams can dig deeper
and provide more unbiased
recommendations.
It will take time to set
up.
Without strong
backing from board
members, may not
have enough influence
to provide long-
lasting change
1-2: Add safety as a
performance
criterion
Limit the pressure for project
managers to meet budget and
time constraints at the cost of
safety
Quality over cost constraints
There is a subjectivity
to how safety factors
in and can be
confusing for project
managers
1-3: Modify
company policy to
exceed regulatory
requirements
Columbia Gas becomes a leader
over a follower regarding safety
regulations.
Reduces the possibility that
Columbia Gas will be fined.
Increased margins
required may turn the
company to be less
competitive with other
companies that follow
the bare minimum
Takes increased time
before project start
2-1: develop a
precise emergency
plan
Reduces the need for the on-site
managers to make high-pressure
decisions in the moment
The plan could be too
rigid, leading to
secondary risks
2-2: Conduct
routine drills Make sure employees practice
the emergency plan.
Practice coordination with local
emergency first responders
Expensive and time-
consuming
May inadvertently
create more
complacency by
allowing people to
feel too comfortable
2-3: Review how
departments
communicate
within the company
Create pathways for company-
wide improvement that will
have long-term benefits for
safety and productivity
Would require drastic
changes to
communications
systems that could be
expensive or time-
consuming to
implement
3-1: Create a
safety-program Invests in future profits by
reducing costs for disaster
events
Will take time to
translate into
employees' attitude
3-2: Create training
classes for new
hires
Improve technical qualifications
within the team
Provide another perk for
employment
Costly and time
consuming to create
and complete
3-3: Bring on board
safety-oriented
board members and
executives
Enables new exchange of
information and practices
Changes may take
time to trickle down
to the whole company
Solutions Ranking Table (Top Solutions in green)
Solution Likelihood of
Success
Difficulty
Implementing
Solution
Score
Solution
Rank 1-5, 5 highest 1-5, 5 least difficult Likelihood of
success times
difficulty
Asdfad sdfasdaafa 4 2 8 3
Adfadfaafadfdfafadsfadsfasdf 5 5 25 1
Adfadsfasdfadfa 3 4 12 2
Adfafddfadfaf adfadsfadf asfasdf 5 5 25 1
Asdfafdadfadsfadf 5 5 25 1
adfadfa 3 1 3 6
Adffdaasdfaddadfaasdfadsfadsfasdf 5 1 5 5
asdfafd 4 2 8 3
adfafdadf 2 3 6 4
Recommendations
From the solutions ranking table above, we can see two stand-out solutions. They have a
high likelihood of success with low difficulty: adding safety to the performance criterion for
project managers and developing a precise emergency plan with routine drills. These are
incredibly urgent as there is no good emergency plan currently in place, and Columbia Gas
cannot sustain another mismanaged emergency, and of course the people of the Merrimack
Valley have had enough in terms of fires and explosions in and around their homes.
These aren’t the only changes – there are also more long-term changes, these changes
will be useful but will require significant resources and time before positive results appear. These
changes are necessary to reinstate their customers' trust in the company as one that safely
manages their natural gas. These changes include creating long term safety programs, more
comprehensive technical training, and making an executive-level office overseeing safety within
the company.
Lastly, a review of the company's communication and corporate culture will shed light on
where Columbia Gas has become complacent. This review is a massive undertaking but will
reveal safety downfalls and inefficient and redundant parts of the company to reorganize to bring
this ancient company forward into the more competitive landscape. These changes, prioritized
and implemented immediately, will significantly reduce any potential future disasters and
mismanagement.
References
Maltzman, R. (2020). Columbia Gas of Massachusetts – Project Issue Analysis – AD642
Individual Assignment 2. Boston.
National Transportation Safety Board. (2019). Overpressurization of Natural Gas Distribution
System, Explosions, and Fires in Merrimack Valley, Massachusetts, September 13, 2018.
Washington, DC: Pipeline Accident Report NTSB/PAR-19/02.
NiSource Inc. (2020, December 1). Home - NiSource. Retrieved from Nisource:
https://www.nisource.com/home
Penn, N. (2019, June 3). The Day the Town Blew Up - Andover Masssachusetts Gass Explosion.
Retrieved from Popular Mechanics:
https://www.popularmechanics.com/technology/infrastructure/a27309627/andover-gas-
explosion/
dfadsfafd adfadfadfafdadfadsfdfdsffds
dflkadsfjlasdfjlafdjldfjladsflasdfasdfasdfasdfasdfasdfdsafadsfdsafadsfadsfadsfadsfasfd
asdfadsfasdfadsfasdfafd