Power 2
EE431/542 HW 10 Can work this as a group Due 12/4
Bus data PU
Bus 1 Slack |V1|=1.02
Bus2 Load P=-2 Q=-0.5
Bus 3 Load |V2|=1 P3=1 |
3
1
2
3
|V1|=1.
|V3|=1.
100 MW
200MW
50MVAR
1
2
Z12
Z13
Y12/2
Y12/2
P3,Q3
P1,Q1
P2,Q2
Y13/2
Y13/2
In the system we studied in class one of the lines is removed. Both generators are set to 1 pu voltage magnitude.
Obtain the power flow solution using a) Gauss Seidel and b) Newton Raphson
Then check using power world (Files are posted)
Line data is on page 2.
Network Data
Notation
z12 is the series impedance in the equivalent pi model of line from bus 1- bus 2
y12/2 is the shunt admittance at each end in the equivalent pi model of line from
bus 1- bus 2
12
z1213i129ohmz12
z12
Zb
z120.0110.108i
pu
y121i80mhoy12y12Zb10
6
y121.1910
3
0.095i
pu
13
z132i50ohmz13
z13
Zb
z131.6810
3
0.042i
pu
y131i20mhoy13y13Zb10
6
y131.1910
3
0.024i
pu
23
z232i180ohmz23
z23
Zb
z231.6810
3
0.151i
pu
y231i70mhoy23y23Zb10
6
y231.1910
3
0.083i
pu