Proposed extension of the CBE for MSc construction students: Sir Barry Gibb Building
1
Proposed MSc Construction Student Centre Sir Barry Gibb Building Team X
DESIGN TASKS
• Tasks split according to discipline
• Format agreed by consensus
• Regular Design Meetings
3/7/2018Design Management 2
Proposed extension of the CBE for MSc construction students: Sir Barry Gibb Building
2
3/7/2018Design Management 3
A9
Architectural Design
Proposed extension of the CBE for MSc construction students: Sir Barry Gibb Building
3
SITE AND SURROUNDINGS
3/7/2018Design Management 5
CONCEPTUAL DESIGN
Alternatives for the client
• Cladding to match with the Sir Gibb building or different design
• Terrace in first floor
• Skywalk connecting the new building with Sir Gibb building
• Quiet study areas – individual rooms or open areas
• Exposed structure and services
• Movable partitions or static walls
• Green Roof
O P T IO N 1
O P T IO N 2
O P T IO N 3
3/7/2018Design Management 6
Proposed extension of the CBE for MSc construction students: Sir Barry Gibb Building
4
DESIGN EVOLUTION
Single Floor Building G+1 Floor Building with initial areas Integration of architectural and structural concepts / space distribution
3/7/2018Design Management 7
FLOOR PLAN # 1
3/7/2018Design Management 8
N
Proposed extension of the CBE for MSc construction students: Sir Barry Gibb Building
5
FLOOR PLAN # 2
3/7/2018Design Management 9
N
ELEVATION & SECTIONS
3/7/2018Design Management 10
Proposed extension of the CBE for MSc construction students: Sir Barry Gibb Building
6
Structural Design
STRUCTURAL CHOICES
FRAMED / UNFRAMED
• Flexibility / Change in usage
• More Floor Space
• Lighter Building
• Faster erection
TYPE OF MATERIALS
• Speed of erection
• Cost/economics
• Fire Protection
• Availability
• Stiffness
• Ability to accommodate movement
• Durability
• Disposal
• Size and nature of site
• Need for temporary work
• Service integration
TARGET: Handover before the academic year starts Earlier ROI
3/7/2018Design Management 12
Proposed extension of the CBE for MSc construction students: Sir Barry Gibb Building
7
STRUCTURAL MATERIALS
BLDG 1: STEEL COMPOSITE BEAMS AND SLAB FRAME PROGRAMME
Fast Track Project Prefab / Composite Deck
Table of key costs for Building 1 (Q4, 2015)
Cost in London Steel Composite Steel + Precast Concrete Slabs
Reinforced Concrete Flat Slab
Post Tensioned Flat Slab
Frame and Upper Floors
£171/sqm GIFA £187/sqm GIFA £170/sqm GIFA £198/sqm GIFA
BLDG 1: STEEL COMPOSITE BEAMS AND PRECAST CONCRETE SLAB FRAME PROGRAMME
3/7/2018Design Management 13
FLOORS
PRECAST SLABS
• Advantages • Fireproof per se
• Better quality
• No need temporary support
• (Hollowcore cheaper than composite?)
• Disadvantages • Long fabrication period?
• Best suited for structures that are totally regular and repetitive in nature
• Lifting equipment
CONCRETE SLABS
• Advantages
• Faster (up to 400m2/day?)
• Flexible to changes in scope
• Constructability
• Disadvantages
• Fireproofing required?
• Secondary beams
3/7/2018Design Management 14
Proposed extension of the CBE for MSc construction students: Sir Barry Gibb Building
8
FLOORS: PREFAB / COMPOSITE SLAB
3/7/2018Design Management 15
STRUCTURAL SYSTEM
3/7/2018Design Management 16
Proposed extension of the CBE for MSc construction students: Sir Barry Gibb Building
9
STRUCTURAL SYSTEM CONT.
3/7/2018Design Management 17
FOUNDATION
Bearing stress +‐ 110 kN/m2 from a depth of ‐1.4 m Ground water level Structural design: Structural steel frame with combined slabs. Load analysis and Detail of Spread Footing:
Services to be connected to existent lines; Water, drainages, gas, voice/data/telephone, HV cable.
Spread Foundations: 2.5m x 2.5m x 0.7m
3/7/2018Design Management 18
Proposed extension of the CBE for MSc construction students: Sir Barry Gibb Building
10
EMPHASIS ON COORDINATION ISSUES
• Thermal Insulation (SE with MEP)
• Green roof insulation and access (All with MEP)
• Services Shaft positioning (All with MEP)
• Floor footprint (SE with MEP)
• Skywalk
3/7/2018Design Management 19
Building Services
Proposed extension of the CBE for MSc construction students: Sir Barry Gibb Building
11
BUILDING SERVICES PROPOSAL
HVAC system embedded with BMS. Type: Hybrid (Mechanical plus Natural ventilation)
• Client demands intelligent/efficient & sustainable building.
• Natural ventilation not sufficient
• Only Mechanical too expensive.
• Building divided into many compartments/divisions, like communal and private areas.
3/7/2018Design Management 21
WORKING OF HVAC SYSTEM
BMS Embedded
3/7/2018Design Management 22
Proposed extension of the CBE for MSc construction students: Sir Barry Gibb Building
12
INTELLIGENT BUILDING MANAGEMENT SYSTEMS
3/7/2018Design Management 23
PRELIMITARIES
Elemental costs Cost/M2 (£) Area (M2) Total Cost (£) Proportion (%)
Scaffolding 4.06 750.00 3045.00 0.38
Excavate topsoil 30.66 60.00 1839.60 0.23
Excavate reinforced surface concrete 11.27 375.00 4226.25 0.53
Temporary fencing 10.59 80.00 847.20 0.11
Temporary project 241.48 240.00 57955.20 7.32
Framed gates 36.03 3.00 144.12 0.02
PRELIMINARIES 102.34 665.00 68057.37 8.60
Proposed extension of the CBE for MSc construction students: Sir Barry Gibb Building
13
TOTAL COST
Element Percentage (%) Total cost of element (£) £ per m2
Substructure 7.43 58816.25 88.45
Superstructure 30.90 244578.53 367.79
Internal finish 11.89 94410.80 141.52
Fittings and furnishings 14.64 115865.47 174.23
Services 12.16 96239.84 144.72
Building Sub‐total 77.01 609610.89 916.71
External works 13.16 104212.15 156.71
Preliminaries 8.60 68057.37 102.34
Contingencies 1.23 9737.50 14.64
Total 100.00 791617.91 1190.40