| | | | | | | FY13 | | FY14 | | FY15 | | FY16 | | FY17 | | FY18 | | FY19 | | FY20 |
| | | | | | | Operating | Capital | Operating | Capital | Operating | Capital | Operating | Capital | Operating | Capital | Operating | Capital | Operating | Capital | Operating | Capital |
| Investment ID | Investment | Start | Finish | Status | Progress | | | | | Forecast | Forecast | Forecast | Forecast | Forecast | Forecast | Forecast | Forecast | Forecast | Forecast | Forecast | Forecast | Business Unit Priority | Department | Funding Source | Value Category | Project Manager | Business Executive Sponsor | Created Date | Investment Focus Area | Planned Benefit | Requesting Business Unit | DTSS Service Portfolio |
| PR04457 | ES: CMS: GoPublish: Product: POC and Discovery for Site Editor/CMS | 6/15/15 | 6/28/17 | Approved | Started | | | | | | | 112000.00 | | | | | | | | | | | EAS - Content Management Systems | Direct/Organizational Budget | | | | 6/16/15 | Other | | /ABC OTV (1005)/ABC OTV-Shared-Other (1058) |
|
| PR04394 | ES: CMS: GoPublish: Product: Site Editor and CMS Improvements | 5/15/15 | 3/2/18 | Approved | Started | | | | | | | 240000.00 | | | | | | | | | | | EAS - Content Management Systems | Direct/Organizational Budget | Foundational Improvement | | | 5/28/15 | Other | | |
|
| PR05921 | Security & Compliance | 7/2/17 | 9/30/18 | Approved | Started | | | | | | | | | | | | 100000.00 | | | | | | EBS - Publishing | Direct/Organizational Budget | Lights On | Rush | | 4/6/17 | Other | | |
|
| PR06070 | Software Currency | 7/3/17 | 9/29/18 | Approved | Started | | | | | | | | | | | | 100000.00 | | | | | | EBS - Licensing | Direct/Organizational Budget | New Capabilities | Rush | | 5/26/17 | Other | | |
|
| PR06068 | Multi-Factor Authentication - Publishing | 7/2/17 | 9/29/18 | Approved | Started | | | | | | | | | | 100000.00 | 20000.00 | 80000.00 | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Rush | | 5/26/17 | Other | | |
|
| PR06069 | European Privacy - TWDC Compliance | 10/2/17 | 6/30/18 | Approved | Not Started | | | | | | | | | | | 20000.00 | 200000.00 | | | | | | EBS - Licensing | Direct/Organizational Budget | Lights On | Rush | | 5/26/17 | Other | | |
|
| PR06067 | Security - TWDC Compliance | 10/2/17 | 9/29/18 | Approved | Not Started | | | | | | | | | | | 25000.00 | 200000.00 | | | | | | EBS - Licensing | Direct/Organizational Budget | Lights On | Rush | | 5/26/17 | Other | | |
|
| PR06065 | European Privacy - TWDC Compliance - Licensing | 10/2/17 | 6/30/18 | Approved | Not Started | | | | | | | | | | | 40000.00 | 200000.00 | | | | | | EBS - Licensing | Direct/Organizational Budget | Lights On | Rush | | 5/26/17 | Other | | |
|
| PR06063 | Multi-Factor Authentication - GMPD | 43010 | 9/29/18 | Approved | Not Started | | | | | | | | | | | 75000.00 | 250000.00 | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Rush | | 5/26/17 | Other | | |
|
| PR06062 | Multi-Factor Authentication - Licensing | 43010 | 9/29/18 | Approved | Not Started | | | | | | | | | | | 75000.00 | 250000.00 | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Rush | | 5/26/17 | Other | | |
|
| PR04168 | FY15 ODC - Switchgear Replacement Phase Three:SUB:Operating | 10/1/14 | 2/22/18 | Approved | Completed | | | | | 136761.00 | | 142260.00 | 0.00 | | 0.00 | | 0.00 | | | | | High | EIS - Ops & Service Delivery | ET Project Budget | Lights On | Dan A | | 3/11/15 | Continuous Availability | | |
|
| PR05794 | FY17 ODC UPSB2 Replacement | 2/6/17 | 3/13/17 | Approved | Completed | | | | | | | | | | 400000.00 | | | | | | | High | EIS - Ops & Service Delivery | ET Project Budget | Lights On | Dan A | | 2/6/17 | Other | | |
|
| PR05332 | FY19 ODC Replace Air Handling Units (AHU’s) | 10/10/18 | 4/15/19 | Unapproved | Not Started | | | | | | | | | | | | | | 400000.00 | | | High | EIS - Ops & Service Delivery | ET Project Budget | Lights On | Dan A | | 6/21/16 | Other | | |
|
| PR05333 | FY19 ODC Upgrade Security Camera System | 7/16/18 | 9/30/19 | Unapproved | Not Started | | | | | | | | | | | | | | 500000.00 | | | Medium | EIS - Ops & Service Delivery | ET Project Budget | Lights On | Dan A | | 6/21/16 | Security | | |
|
| PR02636 | CDE-Cheetahmail (Ongoing Campaign History) | 6/1/14 | 10/31/14 | Approved | Completed | | | | | 20890.00 | | | | | | | | | | | | | ED - CDE | Direct/Organizational Budget | | Bahremand | | 9/5/13 | Other | | /TWDC Corporate (1032)/Brand Management (1802) |
|
| PR06190 | Tax Account Reconciliation Solution (Tax Operations) | 10/1/17 | 43372 | Unapproved | Not Started | | | | | | | | | | | $12,000 | | | | | | | EBS - Controllership | Direct Billed | Foundational Improvement | Sonny | | 6/15/17 | Other | | |
|
| PR06178 | Tax KPI's (Tax Operations) | 10/1/17 | 43372 | Unapproved | Not Started | | | | | | | | | | | $25,000 | | | | | | | EBS - Controllership | Direct Billed | Foundational Improvement | Sonny | | 6/15/17 | Other | | |
|
| PR06199 | BA Web Upgrade | 10/1/17 | 43372 | Unapproved | Not Started | | | | | | | | | | | $41,000 | | | | | | | EBS - Controllership | Direct Billed | Foundational Improvement | Sonny | | 6/15/17 | Other | | |
|
| PR06189 | Document Management - Securely share content externally | 10/1/17 | 43372 | Unapproved | Not Started | | | | | | | | | | | $50,000 | | | | | | | EBS - Controllership | Direct Billed | Foundational Improvement | Sonny | | 6/15/17 | Other | | |
|
| PR06182 | Document Management Systems (Trasfer Pricing) | 10/1/17 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $50,000 | | | | | | | EBS - Controllership | Direct Billed | Foundational Improvement | Sonny | | 6/15/17 | Other | | |
|
| PR06186 | State Work Location in Expense Reporting (Media) | 43009 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $50,000 | | | | | | | EBS - Controllership | Direct/Organizational Budget | Foundational Improvement | Sonny | | 6/15/17 | Other | | |
|
| PR06185 | Tax Contributions DB Expansion (Tax Operations) | 43009 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $50,000 | | | | | | | EBS - Controllership | Direct Billed | Foundational Improvement | Sonny | | 6/15/17 | Other | | |
|
| PR06198 | Exposure Identification | 43009 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $60,000 | | | | | | | EBS - Controllership | Direct Billed | Foundational Improvement | Sonny | | 6/15/17 | Other | | |
|
| PR06183 | OneSource Income Tax Enhancement: State ES (Tax Operations) | 10/1/17 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $75,000 | | | | | | | EBS - Controllership | Direct/Organizational Budget | Foundational Improvement | Sonny | | 6/15/17 | Other | | |
|
| PR06177 | Tax Data Mapping & Management (Tax Operations) | 43009 | 43372 | Unapproved | Not Started | | | | | | | | | | | $75,000 | | | | | | Medium | EBS - Controllership | Direct Billed | Foundational Improvement | Sonny | | 6/15/17 | Other | | |
|
| PR06194 | Track and Store Foreign Withholding Tax Receipts/ VADER (International) | 43009 | 43372 | Unapproved | Not Started | | | | | | | | | | | $75,000 | | | | | | | EBS - Controllership | Direct Billed | Foundational Improvement | Sonny | | 6/15/17 | Other | | |
|
| PR06192 | Workflow/Approval Automation for International Structuring Changes | 43009 | 43372 | Unapproved | Not Started | | | | | | | | | | | $75,000 | | | | | | | EBS - Controllership | Direct Billed | Foundational Improvement | Sonny | | 6/15/17 | Other | | |
|
| PR06203 | Next Gen Finance - Suite on HANA | 10/1/17 | 7/31/18 | Unapproved | Not Started | | | | | | | | | | | $150,000 | $1,250,000 | | | | | High | EBS - Controllership | Corp Dept Allocated | Foundational Improvement | Sonny | | 6/15/17 | Other | | |
|
| PR06195 | Capital Database – Forecast and Plan (Book and Tax Depreciation) | 10/1/17 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $400,000 | $1,400,000 | | | | | High | EBS - Controllership | Corp Dept Allocated | Foundational Improvement | Sonny | | 6/15/17 | Other | | |
|
| PR04921 | T&E and PCard Modernization | 4/6/16 | 2/23/18 | Approved | Started | | | | | | | $0 | $0 | $1,000,000 | $1,817,000 | $200,000 | $200,000 | | | | | High | EBS - Controllership | Direct/Organizational Budget | Foundational Improvement | Sonny | | 12/2/15 | Workforce Enablement | 4777608 | | /Business Applications Services/Finance & Accounting Applications/Travel Management Applications |
| PR06055 | Product Integrity OPA reporting | 10/1/17 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $40,000 | | | | | | | EBS - Compliance | Direct/Organizational Budget | Lights On | Jon B | | 5/25/17 | Other | | |
|
| PR06039 | Creative Operations | 10/1/17 | 9/28/18 | Approved | Not Started | | | | | | | | | | | | $150,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | Lights On | Jon B | | 5/25/17 | Other | | |
|
| PR06046 | European Privacy - TWDC Compliance (Licensing & Publishing split) | 10/1/17 | 9/28/18 | Approved | Not Started | | | | | | | | | | | $30,000 | $170,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | Lights On | Jon B | | 5/25/17 | Other | | |
|
| PR06038 | OPA Product Master (Integration Project) | 10/1/17 | 3/31/18 | Approved | Not Started | | | | | | | | | | | $25,000 | $200,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Jon B | | 5/25/17 | Other | | |
|
| PR06064 | European Privacy - TWDC Compliance - GMPD | 10/2/17 | 6/30/18 | Approved | Not Started | | | | | | | | | | | $40,000 | $200,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | Lights On | Jon B | | 5/26/17 | Other | | |
|
| PR05215 | GMPD - Enterprise Product Lifecycle Management System - Discovery | 10/3/16 | 12/30/16 | Unapproved | Not Started | | | | | | | | | $300,000 | | | | | | | | High | EBS - Logistics | Direct Billed | Foundational Improvement | Jon B | | 5/23/16 | Other | | |
|
| PR06225 | DMC/OPA Artwork Product Integration | 10/1/17 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | | $300,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Jon B | | 6/16/17 | Other | | |
|
| PR06048 | DCP.com Enhancements/DCP Right Now - Communications | 10/1/17 | 9/29/18 | Approved | Not Started | | | | | | | | | | | $109,000 | $200,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Jon B | | 5/25/17 | Other | | |
|
| PR06042 | Software Currency (OPA, DMC) | 4/1/18 | 9/29/18 | Approved | Not Started | | | | | | | | | | | $23,000 | $300,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | New Capabilities | Jon B | | 5/25/17 | Other | | |
|
| PR06050 | Creative Operations (Phase 2 - CROPS) | 10/1/17 | 9/29/18 | Approved | Not Started | | | | | | | | | | | $103,000 | $300,000 | | | | | | EBS - Publishing | Direct/Organizational Budget | Lights On | Jon B | | 5/25/17 | Other | | |
|
| PR06043 | DMC Enhancements (shared from Licensing) | 10/1/17 | 9/29/18 | Approved | Not Started | | | | | | | | | | | $15,000 | $500,000 | | | | | | EBS - Licensing | Direct Billed | Foundational Improvement | Jon B | | 5/25/17 | Other | | |
|
| PR06051 | PI Portal | 10/1/17 | 3/30/18 | Unapproved | Not Started | | | | | | | | | | | $121,000 | $530,000 | | | | | | EBS - Compliance | Direct/Organizational Budget | Lights On | Jon B | | 5/25/17 | Other | | |
|
| PR06047 | Vision Retirement (CROPS/DMC implementation) | 4/2/17 | 9/29/18 | Approved | Not Started | | | | | | | | | | $300,000 | $140,000 | $360,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | Lights On | Jon B | | 5/25/17 | Other | | |
|
| PR06057 | Support for future platform direction | 12/31/17 | 9/29/18 | Approved | Not Started | | | | | | | | | | | $230,000 | $750,000 | | | | | | EBS - Logistics | Direct/Organizational Budget | New Capabilities | Jon B | | 5/25/17 | Other | | |
|
| PR06052 | Vendor Compliance Enforcement Platform | 10/1/17 | 6/30/18 | Unapproved | Not Started | | | | | | | | | | | $255,000 | $1,136,000 | | | | | | EBS - Compliance | Direct/Organizational Budget | New Capabilities | Jon B | | 5/25/17 | Other | | |
|
| PR05956 | Source to Contract Project | 10/1/17 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $821,000 | $615,885 | | | | | | EBS - Procurement | Direct Billed | New Capabilities | Jon B | | 4/27/17 | Other | | |
|
| PR06060 | Enterprise Product Lifecycle Management System | 10/1/17 | 9/29/18 | Approved | Not Started | | | | | | | | | | | $999,000 | $1,325,000 | | | | | | EBS - Compliance | Direct/Organizational Budget | New Capabilities | Jon B | | 5/25/17 | Other | | |
|
| PR05216 | GMPD - Enterprise Product Lifecycle Management System - Wave 1 Implementation | 1/2/17 | 9/29/17 | Unapproved | Not Started | | | | | | | | | $518,000 | $2,650,000 | | | | | | | High | EBS - Logistics | Direct Billed | Foundational Improvement | Jon B | | 5/23/16 | Other | | |
|
| PR04699 | Risk Metrics Maturity | 10/13/15 | 1/21/16 | Approved | Completed | | | | | | | $20,000 | | | | | | | | | | High | Information Security Governance, Risk Management & Compliance | ET Project Budget | New Capabilities | Neel | | 10/13/15 | Security | | |
|
| PR03993 | Risk Fabric Tool Implementation | 12/15/14 | 9/30/15 | Approved | Completed | | | | | | $543,850 | | | | | | | | | | | | Information Security Governance, Risk Management & Compliance | Direct/Organizational Budget | | Neel | | 12/15/14 | Security | | |
|
| PR02955 | FY14 Storage Virtualization (Tier 2) | 10/1/13 | 1/13/16 | Approved | Completed | | | | | | $1,921,190 | | | | | | | | | | | | EIS - Ops & Service Delivery | Direct/Organizational Budget | | Brian B | | 12/17/13 | Other | | |
|
| PR04794 | FY16 RTC to ServiceNow Migration (AMS and BAS) | 8/1/16 | 5/2/18 | Approved | Completed | | | | | | | | | $214,855 | | $0 | | | | | | High | EBS - Shared Services | ET Project Budget | Lights On | Arno | | 11/3/15 | Continuous Availability | 109500 | | /Enabling Functions/Program Management and Governance/ServiceNow Platform |
| PR04695 | Document Management Discovery (Phase 1) | 10/20/15 | 4/15/16 | Approved | Completed | | | | | | | $31,743 | | | | | | | | | | | BE- CE - BTP - Legal | Direct Billed | | Nina | | 10/9/15 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR04427 | Web 2.0 Discovery | 5/4/15 | 10/2/15 | Approved | Completed | | | | | $75,330 | | $10,000 | | | | | | | | | | | ED - CDE | Direct/Organizational Budget | | Renee B | | 6/12/15 | Other | | /TWDC Corporate (1032)/Brand Management (1802) | /Enterprise Data Solutions and Services/Consumer Data Solutions/Customer Data Environment (CDE)/Customer Data Environment |
| PR04715 | Disney ID/Athena On-Boarding to CDE Discovery Project | 11/2/15 | 3/23/16 | Approved | Completed | | | | | | | $87,000 | | | | | | | | | | | ED - CDE | Direct/Organizational Budget | | Renee B | | 10/15/15 | Other | | | /Enterprise Data Solutions and Services/Consumer Data Solutions/Customer Data Environment (CDE) |
| PR04291 | CDE FY16 Project Funding Pool | 10/4/15 | 9/30/16 | Approved | Completed | | | | | | | $577,551 | $1,062,828 | | | | | | | | | | ED - CDE | Corp Dept Allocated | Foundational Improvement | Renee B | | 5/7/15 | Other | | /TWDC Corporate (1032)/Brand Management (1802) |
|
| PR01746 | Treasury - North America Banking Partner Implementation Project | 3/18/13 | 8/7/17 | Approved | Completed | | | | | $996,000 | | $113,000 | | $0 | | | | | | | | | BE - CE - BTP - Finance | Direct Billed | | Jay | | 11/12/12 | Other | | /TWDC Corporate (1032)/Treasury (1815) |
|
| PR05578 | FY17 Orlando Data Center Network Refresh Phase 4A | 10/2/16 | 9/30/17 | Approved | Completed | | | | | | | | | $525,000 | | | | | | | | High | EIS - Ops & Service Delivery | ET Project Budget | Foundational Improvement | Jason B | | 9/21/16 | Other | | |
|
| PR03618 | FY15 Orlando Data Center Network Refresh Project Phase I & II | 10/1/14 | 9/30/15 | Approved | Completed | | | | | $972,185 | | | | | | | | | | | | | EIS - Ops & Service Delivery | Direct/Organizational Budget | | Jason B | | 9/11/14 | Other | | /TWDC Corporate (1032) |
|
| PR04447 | FY16 Orlando Data Center Network Refresh Phase III | 10/5/15 | 6/14/17 | Approved | Completed | | | | | | | $1,357,241 | | $0 | | | | | | | | High | EIS - Ops & Service Delivery | ET Project Budget | Lights On | Jason B | | 6/16/15 | Continuous Availability | | /TWDC Corporate (1032) |
|
| PR04179 | SA - FY15 Visitor Internet Access & Authentication | 2/1/15 | 12/30/16 | Approved | Started | | | | | $682,732 | $1,398,720 | $569,799 | $15,000 | $56,000 | | | | | | | | High | EIS - Infrastructure Eng & Design | Direct/Organizational Budget | Foundational Improvement | Jason B | | 3/20/15 | Security | | |
|
| PR05937 | Legal Intranet FY16 GNC Invoice | 4/7/17 | 9/29/17 | Approved | Completed | | | | | | | | | $20,277 | $0 | | | | | | | High | BE - WE - APS | ET Project Budget | Foundational Improvement | Barbara B | | 4/7/17 | Corporate Customer Driven | | |
|
| PR05159 | Document Management: Pilot and Project Prep | 5/1/17 | 2/20/18 | Approved | Completed | | | | | | | | | $131,468 | $0 | $55,522 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Barbara B | | 4/27/16 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR03963 | Entrust Migration to ECS | 12/1/14 | 9/30/16 | Approved | Completed | | | | | $15,000 | | $35,640 | | | | | | | | | | High | Information Security Operations & Remediation Services | ET Project Budget | Lights On | Jeffrey | | 12/1/14 | Security | | |
|
| PR03928 | Increase SIEM Capability | 10/1/14 | 3/15/17 | Approved | Completed | | | | | $400,000 | | $0 | | $0 | | | | | | | | | Information Security Operations & Remediation Services | ET Project Budget | | Jeffrey | | 11/7/14 | Security | | |
|
| PR04480 | Implement Full Packet Data Capture for Network Security Monitoring | 2/15/16 | 9/28/18 | Approved | Completed | | | | | | | $219,673 | $881,211 | $0 | $0 | | $0 | | | | | High | Information Security Operations & Remediation Services | ET Project Budget | New Capabilities | Jeffrey | | 7/1/15 | Security | | |
|
| PR04478 | Security Information & Event Monitoring (SIEM/QRADAR) Hardware/Software Refresh | 2/1/16 | 9/30/16 | Approved | Completed | | | | | | | $313,261 | $856,887 | | | | | | | | | High | Information Security Operations & Remediation Services | ET Project Budget | Lights On | Jeffrey | | 7/1/15 | Security | | |
|
| PR03034 | SAP WebMethods Modernization (Shuttle Replacement) | 2/23/14 | 9/23/16 | Approved | Completed | | | | | $127,206 | $163,775 | $51,615 | $0 | | | | | | | | | | EBS - Studio | ET Project Budget | Lights On | Joyce | | 1/28/14 | Other | | | /Business Applications Services |
| PR05698 | Software Currency - Websphere Consolidation | 12/2/16 | 3/31/17 | Unapproved | Not Started | | | | | | | | | | $100,000 | | | | | | | Low | EBS - Shared Services | Direct Billed | New Capabilities | Mark C | | 12/2/16 | Other | | |
|
| PR03515 | Supply Chain – Total Product/Production Visibility - PPV | 1/1/14 | 12/30/14 | Approved | Started | | | | | $384,733 | | | | | | | | | | | | High | Office of CIO | Direct Billed | | Michael C | | 8/6/14 | Other | | |
|
| PR06123 | FY18 DLR Network Switch Expansion - Anaheim Growth | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | | $42,000 | | | | | Low | EIS - Ops & Service Delivery | ET Project Budget | Lights On | Ganesh | | 6/7/17 | Other | | |
|
| PR06121 | FY18 Phase 2 - Net Scout | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | | $2,000,000 | | | | | | EIS - Ops & Service Delivery | ET Project Budget | Foundational Improvement | Ganesh | | 6/7/17 | Other | | |
|
| PR05815 | Platform Application Bucket: eDOCS links in Insider | 2/2/17 | 3/3/17 | Approved | Completed | | | | | | | | | $408 | | | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 2/23/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06552 | Place 90-day Auto Purge on the Scanning Directory | 10/12/17 | 1/30/18 | Approved | Completed | | | | | | | | | | | $718 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 10/12/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05813 | Platform Application Bucket: OC Portal | 2/2/17 | 3/3/17 | Approved | Completed | | | | | | | | | $1,513 | | | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 2/23/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05816 | Platform Application Bucket: Immigration Tracker middleware | 2/1/17 | 2/16/17 | Approved | Completed | | | | | | | | | $3,575 | | | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 2/23/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06585 | GECM: Compliance SharePoint Site Enhancement | 10/25/17 | 5/1/18 | Approved | Started | | | | | | | | | | | $5,016 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 10/26/17 | Other | | /TWDC Corporate (1032)/Global Ethics and Compliance Mgmt (2483) |
|
| PR05814 | Platform Application Bucket: LR Portal | 2/2/17 | 3/3/17 | Approved | Completed | | | | | | | | | $6,463 | | | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 2/23/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06545 | APDM: Install Broadband Internet | 10/8/17 | 12/10/17 | Approved | Completed | | | | | | | | | | | $7,300 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 10/12/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06804 | NetDocuments - Create a usage activity reports | 10/1/18 | 1/1/19 | Unapproved | Not Started | | | | | | | | | | | | | $10,000 | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 3/13/18 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05812 | eSignature Bucket: DocuSign Backup for Corporate Legal | 1/2/17 | 3/3/17 | Approved | Completed | | | | | | | | | $12,000 | | | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 2/23/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05415 | Legal Records Electronic Records Submission Portal | 2/11/15 | 7/1/16 | Approved | Completed | | | | | $10,350 | | $3,651 | | | | | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 7/11/16 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06807 | NetDocuments - Antipiracy DM – Store all enforcement emails to NetDocuments | 11/13/18 | 2/13/19 | Unapproved | Not Started | | | | | | | | | | | | | $15,000 | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 3/13/18 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06631 | eBilling and Matter Management Discovery 2 | 2/4/20 | 5/3/20 | Unapproved | Not Started | | | | | | | | | | | | | $18,000 | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Matt | | 11/16/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06805 | NetDocuments - DocuSign Integration | 11/13/18 | 2/1/19 | Unapproved | Not Started | | | | | | | | | | | | | $30,000 | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 3/13/18 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06695 | Rate Warehouse: Firms Upload Rates | 11/1/18 | 3/29/19 | Unapproved | Not Started | | | | | | | | | | | | | $30,000 | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 1/22/18 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06806 | NetDocuments - Import second wave of network folders | 12/13/18 | 4/1/19 | Unapproved | Not Started | | | | | | | | | | | | | $40,000 | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 3/13/18 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06546 | BoardVantage: Upgrade to MeetX Platform & Activate SSO - Implementation -July 31 | 5/1/18 | 7/31/18 | Unapproved | Not Started | | | | | | | | | | | $45,000 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 10/12/17 | Other | | /TWDC Corporate (1032)/BOD (1964) |
|
| PR06666 | GECM: Foreign Government Official (Approval) Requests - Implementation | 9/1/18 | 12/31/18 | Unapproved | Not Started | | | | | | | | | | | $15,000 | | $35,000 | | | | | BE- CE - BTP - Legal | Direct Billed | New Capabilities | Matt | | 12/28/17 | Other | | /TWDC Corporate (1032)/Global Ethics and Compliance Mgmt (2483) |
|
| PR06801 | NetDocuments - Integrate NetDocuments with Rightsline | 10/1/18 | 3/1/19 | Unapproved | Not Started | | | | | | | | | | | | | $50,000 | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 3/13/18 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06628 | International Dubbing: Phase 2 (Enhancements) | 10/1/18 | 12/28/18 | Unapproved | Not Started | | | | | | | | | | | | | $60,000 | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 11/16/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06813 | NetDocuments - Migrate DLR Guest Claims from eDOCS to NetDocuments | 6/3/19 | 9/27/19 | Unapproved | Not Started | | | | | | | | | | | | | $70,000 | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 3/14/18 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06548 | GECM: Technology Rationalization Opportunities - Discovery | 10/12/17 | 7/31/18 | Approved | Started | | | | | | | | | | | $85,000 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 10/12/17 | Other | | /TWDC Corporate (1032)/Global Ethics and Compliance Mgmt (2483) |
|
| PR06809 | GECM: Implement technologies as a result of assessment | 9/13/18 | 1/15/19 | Unapproved | Not Started | | | | | | | | | | | $25,000 | | $75,000 | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 3/13/18 | Other | | /TWDC Corporate (1032)/Global Ethics and Compliance Mgmt (2483) |
|
| PR05105 | Document Management: System Phase II migrations and enhancements | 3/1/19 | 5/30/19 | Unapproved | Not Started | | | | | | | | | | | | | $125,000 | | | | | BE- CE - BTP - Legal | Direct Billed | New Capabilities | Matt | | 4/11/16 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06797 | NetDocuments - Onboard International Users | 10/1/18 | 2/1/19 | Unapproved | Not Started | | | | | | | | | | | | | $150,000 | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 3/13/18 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR04419 | Business Standards and Compliance Management Branding and Web Presence | 6/15/15 | 11/30/15 | Approved | Completed | | | | | $18,340 | $102,620 | $6,580 | $43,120 | | | | | | | | | | BE- CE - BTP - Legal | Direct Billed | | Matt | | 6/8/15 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05795 | Blueprint OneWorld: Replacement (Entity Management) - Implementation | 11/1/18 | 4/30/19 | Unapproved | Not Started | | | | | | | | | | | | | $130,000 | $220,000 | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Matt | | 2/9/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06158 | Enhance/Replace DFE (Disney File Exchange) | 10/1/17 | 6/30/18 | Unapproved | Not Started | | | | | | | | | | | $50,000 | $400,000 | | | | | | EBS - Shared Services | Direct/Organizational Budget | Foundational Improvement | Dana | | 6/13/17 | Other | | |
|
| PR06072 | Software Currency | 10/1/17 | 9/29/18 | Approved | Not Started | | | | | | | | | | | $80,000 | $400,000 | | | | | | EBS - Shared Services | Direct/Organizational Budget | New Capabilities | Dana | | 5/26/17 | Other | | |
|
| PR05262 | CDE WDPR Active Email Onboarding | 8/22/16 | 11/11/16 | Approved | Completed | | | | | | | $32,032 | | $32,032 | | | | | | | | | ED - CDE | Direct/Organizational Budget | Foundational Improvement | Scott C | | 5/31/16 | Other | | |
|
| PR05050 | DTG TicketMaster Onboarding | 3/28/16 | 4/28/17 | Approved | Completed | | | | | | | $0 | | $77,922 | | | | | | | | | ED - CDE | Direct/Organizational Budget | New Capabilities | Scott C | | 3/15/16 | Other | | |
|
| PR06637 | CDE EPC Integration | 10/9/17 | 2/16/18 | Unapproved | Not Started | | | | | | | | | | | $91,000 | $138,000 | | | | | High | EAS – Consumer Identity & Data | Corp Dept Allocated | Foundational Improvement | Scott C | | 11/27/17 | Other | | |
|
| PR05014 | OneID/Athena On-Boarding to CDE Implementation Project | 3/28/16 | 9/30/16 | Approved | Completed | | | | | | | $125,000 | $273,972 | | | | | | | | | | ED - CDE | Direct/Organizational Budget | New Capabilities | Scott C | | 2/23/16 | Other | | |
|
| PR06638 | FY18 CDE Migration | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $800,000 | $1,700,000 | | | | | High | EAS – Consumer Identity & Data | Corp Dept Allocated | Foundational Improvement | Scott C | | 11/27/17 | Other | | |
|
| PR04318 | Personalization - PMO Support FY16 | 10/1/15 | 10/24/16 | Approved | Completed | | | | | | | $261,480 | | $0 | | | | | | | | High | EAS - Personalization | ET Project Budget | New Capabilities | Rafa | | 5/8/15 | Personalization and Consumer ID | | |
|
| PR04553 | Personalization Discovery Phase | 8/10/15 | 9/29/17 | Approved | Completed | | | | | $0 | $300,000 | $0 | $100,000 | $0 | | | | | | | | | Enterprise Data | Direct/Organizational Budget | | Rafa | | 7/30/15 | Personalization and Consumer ID | | |
|
| PR04680 | Personalization - Aggregating, Enriching, & Sharing of Customer Data | 10/9/15 | 3/12/18 | Approved | Completed | | | | | | | $731,090 | | $0 | | | | | | | | High | EAS - Personalization | ET Project Budget | New Capabilities | Rafa | | 10/8/15 | Personalization and Consumer ID | | |
|
| PR05155 | SaaS Data Protection Assessment | 4/19/16 | 9/30/16 | Approved | Completed | | | | | | | $105,000 | | | | | | | | | | | Information Security Governance, Risk Management & Compliance | Direct/Organizational Budget | Foundational Improvement | Moira | | 4/21/16 | Other | | |
|
| PR04479 | Key Mission Critical / Mission Critical DR Assessment | 10/1/15 | 3/20/17 | Approved | Completed | | | | | | | $92,200 | | $14,160 | | | | | | | | High | Information Security Governance, Risk Management & Compliance | ET Project Budget | Foundational Improvement | Moira | | 7/1/15 | Security | | |
|
| PR06156 | Data Protection Benchmark and Recommendation | 6/12/17 | 9/29/17 | Approved | Completed | | | | | | | | | $109,360 | | | | | | | | High | Information Security Governance, Risk Management & Compliance | ET Project Budget | Foundational Improvement | Moira | | 6/12/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Governance, Risk Management & Compliance |
| PR04548 | GIS Payment Technology Assessment | 7/30/15 | 6/17/16 | Approved | Completed | | | | | $0 | | $125,572 | | | | | | | | | | High | Information Security Governance, Risk Management & Compliance | ET Project Budget | Lights On | Moira | | 7/30/15 | Security | | |
|
| PR06102 | WDI Security Assessment | 6/5/17 | 9/29/17 | Approved | Completed | | | | | | | | | $126,187 | | | | | | | | High | Information Security Governance, Risk Management & Compliance | ET Project Budget | Foundational Improvement | Moira | | 6/1/17 | Other | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Governance, Risk Management & Compliance |
| PR03960 | Implement IT GRC ServiceNow Module | 12/8/14 | 2/20/17 | Approved | Completed | | | | | $51,504 | $128,619 | $1,226 | $48,237 | $0 | $0 | | | | | | | High | Information Security Governance, Risk Management & Compliance | ET Project Budget | New Capabilities | Moira | | 11/25/14 | Security | | |
|
| PR04764 | Consolidated Penetration Test – Shanghai (SHDR) | 1/1/16 | 9/30/16 | Approved | Completed | | | | | | | $250,000 | | | | | | | | | | High | Information Security Governance, Risk Management & Compliance | ET Project Budget | Foundational Improvement | Moira | | 10/28/15 | Security | | |
|
| PR04132 | SA - Threat Assessment and Response | 2/19/15 | 1/18/16 | Approved | Completed | | | | | $345,374 | | $54,000 | | | | | | | | | | High | Information Security Architecture & Engineering | Direct/Organizational Budget | Lights On | Moira | | 2/19/15 | Security | | |
|
| PR06348 | Machine Learning for PI | 8/7/17 | 9/29/17 | Unapproved | Not Started | | | | | | | | | $82,840 | | | | | | | | | EBS - Compliance | Direct/Organizational Budget | Foundational Improvement | Terrie | | 7/28/17 | Other | | |
|
| PR05953 | Logistics - OD Remediation | 10/1/17 | 12/31/17 | Approved | Not Started | | | | | | | | | | | $109,000 | | | | | | | EBS - Logistics | Direct Billed | Foundational Improvement | Terrie | | 4/27/17 | Other | | |
|
| PR05221 | Logistics - OTM Expansion into TDSUK | 11/1/16 | 12/14/17 | Unapproved | Not Started | | | | | | | | | $77,000 | $415,000 | | $0 | | | | | High | EBS - Logistics | Direct Billed | Foundational Improvement | Terrie | | 5/23/16 | Other | | |
|
| PR05222 | Logistics - OTM Expansion DLP | 3/1/17 | 7/28/17 | Unapproved | Not Started | | | | | | | | | $67,000 | $518,000 | | | | | | | High | EBS - Logistics | Direct Billed | Foundational Improvement | Terrie | | 5/23/16 | Other | | |
|
| PR05954 | Logistics - Yard Management | 10/1/17 | 3/31/18 | Unapproved | Not Started | | | | | | | | | | | $245,000 | $396,000 | | | | | | EBS - Logistics | Direct Billed | New Capabilities | Terrie | | 4/27/17 | Other | | |
|
| PR05227 | Compliance - Chemical Policy Control platform | 10/3/16 | 4/28/17 | Unapproved | Not Started | | | | | | | | | $300,000 | $470,000 | | | | | | | High | EBS - Compliance | Direct Billed | Foundational Improvement | Terrie | | 5/23/16 | Other | | |
|
| PR05228 | Global Trade Management (Restricted Party Screening & BU FOH Integration) Phase1 | 10/3/16 | 9/30/18 | Unapproved | Started | | | | | | | | | | | $334,000 | $801,000 | | | | | High | EBS - Logistics | Direct Billed | New Capabilities | Terrie | | 5/23/16 | Other | | |
|
| PR05952 | Global Trade Management (Restricted Party Screening & BU FOH Integration)Phase2 | 4/27/17 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $334,000 | $801,000 | | | | | | EBS - Logistics | Direct Billed | New Capabilities | Terrie | | 4/27/17 | Other | | |
|
| PR05229 | ILS - FANS Program | 10/1/17 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $181,000 | $1,413,000 | | | | | High | EBS - Compliance | Direct Billed | Foundational Improvement | Terrie | | 5/23/16 | Other | | |
|
| PR05219 | Replatform Product Integrity PIMS System | 10/3/16 | 6/30/18 | Unapproved | Started | | | | | | | | | | | $422,000 | $1,558,000 | | | | | High | EBS - Compliance | Direct Billed | Lights On | Terrie | | 5/23/16 | Other | | |
|
| PR04426 | GlobalScape Re-Arch~HA | 7/1/15 | 11/30/16 | Approved | Completed | | | | | | | $3,547 | | $16,545 | | | | | | | | High | BE - WE - Social Business Technology | ET Project Budget | Foundational Improvement | Charlotte | | 6/11/15 | Other | | |
|
| PR05341 | AppSec: Secure Development Integration Expansion | 4/3/17 | 10/24/17 | Approved | Completed | | | | | | | | | $150,840 | $200,200 | $0 | $0 | | | | | High | Information Security Assurance Services | ET Project Budget | Foundational Improvement | Brian D | | 6/21/16 | Security | | |
|
| PR04488 | AppSec: Secure Development Initiative | 2/15/16 | 1/11/18 | Approved | Completed | | | | | | | $0 | $0 | $101,000 | $560,000 | $0 | $0 | | $458,000 | | | High | Information Security Assurance Services | ET Project Budget | New Capabilities | Brian D | | 7/6/15 | Security | | |
|
| PR04743 | Enterprise Consumer Payments | 8/28/15 | 12/31/18 | Approved | Started | | | | | | | $378,703 | | $4,725 | | | | | | | | High | Business Enablement | ET Project Budget | Foundational Improvement | Janette | | 10/23/15 | Strategy-Innovation-R&D | | |
|
| PR06219 | Technology Policy Development and Global Implementation/Management | 10/1/17 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $35,000 | | | | | | | EBS - Treasury - ECP | Direct Billed | Foundational Improvement | Jason D | | 6/16/17 | Other | | |
|
| PR06218 | Merchant Account Controls (MID Database) | 10/1/17 | 9/29/18 | Unapproved | Not Started | | | | | | | | | $40,000 | | $45,000 | | | | | | | EBS - Treasury - ECP | Direct Billed | Foundational Improvement | Dunn, Jason | | 6/16/17 | Other | | |
|
| PR06221 | Emerging Markets | 10/1/17 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $100,000 | | | | | | | EBS - Treasury - ECP | Direct Billed | Foundational Improvement | Dunn, Jason | | 6/16/17 | Other | | |
|
| PR06220 | Migrate European Volume to Best in Class Architecture | 10/1/17 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $200,000 | | | | | | | EBS - Treasury - ECP | Direct Billed | Foundational Improvement | Dunn, Jason | | 6/16/17 | Other | | |
|
| PR05451 | Third Party Risk Monitoring | 10/1/17 | 3/31/18 | Unapproved | Not Started | | | | | | | | | | | $90,000 | $200,000 | | | | | High | EBS - Treasury - ECP | Direct Billed | New Capabilities | Dunn, Jason | | 7/22/16 | Other | | |
|
| PR05884 | Enhanced Analytic Capabilities | 10/1/17 | 3/31/18 | Unapproved | Not Started | | | | | | | | | | | $250,000 | $125,000 | | | | | | EBS - Treasury - ECP | Direct Billed | New Capabilities | Dunn, Jason | | 4/4/17 | Other | | |
|
| PR05881 | New Acceptance Options and Services | 4/1/17 | 3/31/18 | Unapproved | Started | | | | | | | | | | | $300,000 | $125,000 | | | | | High | EBS - Treasury - ECP | Direct Billed | New Capabilities | Dunn, Jason | | 4/4/17 | Other | | |
|
| PR05959 | Disney "Payments Central" / Wallet | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $200,000 | $250,000 | | | | | | EBS - Treasury - ECP | Direct Billed | New Capabilities | Dunn, Jason | | 4/27/17 | Other | | |
|
| PR05958 | Transaction Cost (Interchange) Optimization | 10/2/17 | 6/30/18 | Unapproved | Not Started | | | | | | | | | | | $125,000 | $500,000 | | | | | | EBS - Treasury - ECP | Direct Billed | New Capabilities | Dunn, Jason | | 4/27/17 | Other | | |
|
| PR05444 | Subscription & Billing Platform | 10/3/16 | 6/30/18 | Unapproved | Not Started | | | | | | | | | $100,000 | | $300,000 | $500,000 | | | | | High | EBS - Treasury - ECP | Direct Billed | New Capabilities | Dunn, Jason | | 7/20/16 | Other | | |
|
| PR05957 | US and Canada Card-Not-Present Evaluation | 10/1/17 | 9/29/18 | Unapproved | Started | | | | | | | | | | | $100,000 | $1,000,000 | | | | | | EBS - Treasury - ECP | Direct/Organizational Budget | Foundational Improvement | Dunn, Jason | | 4/27/17 | Other | | |
|
| PR05349 | Data Protection: Perimeter Defense Communication and Prioritization | 4/3/17 | 10/24/17 | Approved | Completed | | | | | | | | | $187,620 | | $0 | | | | | | High | Enterprise Architecture & Global Information Security & Technology Risk Mgmt | ET Project Budget | New Capabilities | Julie | | 6/21/16 | Security | | |
|
| PR05811 | GIS Support for DTSS Cloud Strategy & Transformation Program | 2/13/17 | 9/29/17 | Approved | Completed | | | | | | | | | $247,609 | | | | | | | | High | Information Security Architecture & Engineering | ET Project Budget | New Capabilities | Julie | | 2/23/17 | Security | | |
|
| PR06606 | Data: Extend Network Data Monitoring and Protection for the Cloud Security Compl | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | | $350,000 | | | | | High | Information Security Architecture & Engineering | ET Project Budget | New Capabilities | Julie | | 11/3/17 | Other | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Architecture & Engineering |
| PR04490 | Imperva DB Monitoring - Phase 3 | 10/1/15 | 12/21/16 | Approved | Completed | | | | | | $3,780 | $237,302 | $586,901 | $37,000 | $37,000 | | | | | | | High | Information Security Architecture & Engineering | ET Project Budget | Foundational Improvement | Julie | | 7/6/15 | Security | | |
|
| PR05464 | FY17 Cloud Strategy Phase 1 | 11/14/16 | 12/26/17 | Approved | Started | | | | | | | | | $1,633,000 | | $0 | | | | | | High | Enterprise Infrastructure Svcs | ET Project Budget | New Capabilities | Candace | | 7/29/16 | Cloud Accelerator | | |
|
| PR04470 | University of Florida IPPD | 10/1/14 | 9/30/16 | Approved | Completed | | | | | $0 | | $28,000 | | | | | | | | | | High | Information Security Governance, Risk Management & Compliance | Direct/Organizational Budget | | Ahmed | | 6/26/15 | Security | | |
|
| PR04497 | Information Security Policy & Standards (ISPS) Technology Integration | 10/1/15 | 11/7/16 | Approved | Completed | | | | | | | | $200,000 | | $0 | | | | | | | High | Information Security Governance, Risk Management & Compliance | ET Project Budget | New Capabilities | Ahmed | | 7/6/15 | Security | | |
|
| PR06229 | Employee Center Mobile POS | 6/16/17 | 6/16/17 | Unapproved | Not Started | | | | | | | | | | | $10,000 | | | | | | | BE - CE - Corporate Staff II | Direct Billed | Foundational Improvement | Mike F | | 6/16/17 | Other | | /Corporate Segment (1737) |
|
| PR04386 | SQL Server Monitoring | 10/27/14 | 6/29/15 | Approved | Completed | | | | | $201,000 | | | | | | | | | | | | | ED - Governance | Direct/Organizational Budget | | Fusco | | 5/27/15 | Other | | |
|
| PR04498 | Controls Testing and Assurance | 12:00:00 AM | 9/30/16 | Approved | Completed | | | | | | | $165,500 | | | | | | | | | | High | Information Security Governance, Risk Management & Compliance | ET Project Budget | New Capabilities | Michelle G | | 7/6/15 | Security | | |
|
| PR04333 | FNI to CIG Chase Platform Migration | 12:00:00 AM | 12/31/15 | Approved | Completed | | | | | $412,500 | | $37,500 | | | | | | | | | | | BE - CE - Brand Management | Direct Billed | | Michelle G | | 5/13/15 | Other | | /TWDC Corporate (1032)/Brand Management (1802) |
|
| PR05905 | MDM Extension | 12:00:00 AM | 9/30/17 | Unapproved | Not Started | | | | | | | | | | $100,000 | | | | | | | | EBS - Licensing | Direct/Organizational Budget | Lights On | Steve Gar | | 4/4/17 | Other | | |
|
| PR05903 | Product Integration | 12:00:00 AM | 9/30/17 | Unapproved | Not Started | | | | | | | | | | $100,000 | | | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Steve Gar | | 4/4/17 | Other | | |
|
| PR05897 | Software Currency - OPA Software Stack | 7/2/17 | 9/30/17 | Unapproved | Not Started | | | | | | | | | | $100,000 | | | | | | | | EBS - Licensing | Direct/Organizational Budget | New Capabilities | Steve Gar | | 4/4/17 | Other | | |
|
| PR06032 | Data Visualization | 10/2/17 | 9/29/18 | Approved | Not Started | | | | | | | | | | | | $100,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | New Capabilities | Steve Gar | | 5/24/17 | Other | | |
|
| PR06028 | MDM Extension | 10/2/17 | 9/29/18 | Approved | Not Started | | | | | | | | | | | | $100,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Steve Gar | | 5/24/17 | Other | | |
|
| PR06026 | Reconcile / True-Up | 10/1/17 | 4328100.00% | Approved | Not Started | | | | | | | | | | | | $100,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Steve Gar | | 5/24/17 | Other | | |
|
| PR06161 | Revenue Accounting Systems Enhancements | 10/1/17 | 4337200.00% | Unapproved | Not Started | | | | | | | | | | | $100,000 | | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Steve Gar | | 6/13/17 | Other | | |
|
| PR06314 | CLM Fast Track / Esignature | 12/31/17 | 4328100.00% | Unapproved | Not Started | | | | | | | | | | | $20,000 | $100,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Steve Gar | | 7/17/17 | Other | | |
|
| PR05890 | Software Currency--DB2 upgrade | 4/2/17 | 12/31/17 | Approved | Started | | | | | | | | | | $100,000 | | $50,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | New Capabilities | Steve Gar | | 4/4/17 | Other | | |
|
| PR05896 | Data Integration Services | 7/2/17 | 9/30/17 | Unapproved | Not Started | | | | | | | | | | $200,000 | | | | | | | | EBS - Licensing | Direct/Organizational Budget | Lights On | Steve Gar | | 4/4/17 | Other | | |
|
| PR05904 | Reconcile True-Up | $ 42,829.00 | 4/4/17 | Unapproved | Not Started | | | | | | | | | | $200,000 | | | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Steve Gar | | 4/4/17 | Other | | |
|
| PR05889 | DMC Search Tool Upgrade (Licensing & Publishing split) | 10/2/16 | 4/1/17 | Approved | Started | | | | | | | | | | $224,000 | | | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Steve Gar | | 4/4/17 | Other | | |
|
| PR05898 | OPA BPM (Brand & Product Management) | 42881.00 | 12/27/17 | Approved | Not Started | | | | | | | | | | $250,000 | | $0 | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Steve Gar | | 4/4/17 | Other | | |
|
| PR06030 | PMM to Product Master Replacement | 10/1/17 | 9/29/18 | Approved | Not Started | | | | | | | | | | | | $250,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | Lights On | Steve Gar | | 5/24/17 | Other | | |
|
| PR06029 | RADW - Reporting Enhancements | 10/1/17 | 43190.00 | Approved | Not Started | | | | | | | | | | | | $250,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Steve Gar | | 5/24/17 | Other | | |
|
| PR06160 | SKU Efficiency - Performance Scorecards | 10/1/17 | 3/31/18 | Unapproved | Not Started | | | | | | | | | | | $75,000 | $200,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Steve Gar | | 6/13/17 | Other | | |
|
| PR05899 | 85/15 Healthy Food Reporting | 7/2/17 | 9/30/17 | Unapproved | Not Started | | | | | | | | | | $300,000 | | | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Steve Gar | | 4/4/17 | Other | | |
|
| PR05907 | Archive (Insight) | 42919.00 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $50,000 | $250,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Steve Gar | | 4/4/17 | Other | | |
|
| PR06025 | BI - Cloud Migration | 43009.00 | 6/30/18 | Approved | Not Started | | | | | | | | | | | $125,000 | $200,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | New Capabilities | Steve Gar | | 5/24/17 | Other | | |
|
| PR05894 | Online Product Approval Application Framework Modernization | 42827.00 | 11/30/17 | Approved | Not Started | | | | | | | | | | $339,000 | | $20,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | New Capabilities | Steve Gar | | 4/4/17 | Other | | |
|
| PR05892 | Revenue Accounting Conversion | 42736.00 | 3/31/18 | Approved | Started | | | | | | | | | | $315,000 | | $67,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Steve Gar | | 4/4/17 | Other | | |
|
| PR06163 | Licensee Forecasting System (Replace INvision) | 10/2/17 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $100,000 | $400,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Steve Gar | | 6/13/17 | Other | | |
|
| PR06164 | Contract Management - Selectica Replacement (SaaS) | 43009.00 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $500,000 | | | | | | | EBS - Licensing | Direct/Organizational Budget | Foundational Improvement | Steve Gar | | 6/13/17 | Other | | |
|
| PR05886 | MicroStrategy V10 Upgrade (Software Currency) | 42644.00 | 7/27/17 | Approved | Started | | | | | | | | | | $630,000 | | | | | | | | EBS - Licensing | Direct/Organizational Budget | Lights On | Steve Gar | | 4/4/17 | Other | | |
|
| PR05900 | Revenue Accounting System Phase 2 (IPM) | 42918.00 | 9/30/17 | Approved | Started | | | | | | | | | $50,000 | $100,000 | | $500,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | New Capabilities | Steve Gar | | 4/4/17 | Other | | |
|
| PR05891 | FY14 Revenue Accounting System Phase 1 (IPM) | 10/2/16 | 7/17/17 | Approved | Started | | | | | | | | | | $1,287,000 | | $175,000 | | | | | | EBS - Licensing | Direct/Organizational Budget | New Capabilities | Steve Gar | | 4/4/17 | Other | | |
|
| PR04575 | DTSS EIS GSO - DITSC PBX Upgrade | 8/14/15 | 3/31/17 | Approved | Completed | | | | | | | $0 | $487,000 | | $18,000 | | | | | | | Medium | EIS - Ops & Service Delivery | ET Project Budget | Foundational Improvement | Mark G | | 8/14/15 | Other | | /Corporate Segment (1737) |
|
| PR04028 | FY15 - TWS Upgrade | 2/1/15 | $42,170.00 | Approved | Completed | | | | | | $439,720 | | | | | | | | | | | | EIS - Ops & Service Delivery | Direct/Organizational Budget | | Ben G | | 1/6/15 | Other | 2435000 | |
|
| PR03229 | BPM Platform Replacement | 10/1/14 | $42,541.00 | Approved | Completed | | | | | $45,681 | $719,282 | $125,591 | $322,910 | | | | | | | | | High | BE - WE - APS | ET Project Budget | New Capabilities | David G | | 5/7/14 | Continuous Availability | 1449797 | | /Workforce Technology/Enterprise Content Management/Business Process Management |
| PR06132 | FY18 Refresh Electrical Circuits | 10/2/17 | $43,371.00 | Approved | Started | | | | | | | | | | | $517,500 | | | | | | | EIS - Ops & Service Delivery | ET Project Budget | Service Risk | Kelly | | 6/7/17 | Other | | |
|
| PR03310 | ADM Agreement Renegotiation Strategy � Transition Phase | 5/20/14 | 7/18/17 | Approved | Completed | | | | | $555,000 | | $0 | | $0 | | | | | | | | | EBS - FP&A | ET Project Budget | Foundational Improvement | Karen G | | 5/20/14 | Other | | |
|
| PR01719 | Developer Productivity Enablement | 11/12/12 | 2/22/18 | Approved | Completed | | | | | $93,000 | | $0 | | $0 | | $0 | | | | | | | EAS - Engineering | ET Project Budget | | Melissa | | 10/29/12 | Other | | |
|
| PR03878 | DDM: Chef/GitHub Legacy Rollout | 6/15/15 | 4/29/16 | Approved | Completed | | | | | $12,000 | | $48,000 | | | | | | | | | | High | BE - WE - Digital Media Agency (DMA) | ET Project Budget | Foundational Improvement | Kara | | 10/22/14 | Continuous Availability | 80000 | | /Engineering Services/Professional Services/Digital Media Agency |
| PR04622 | DDM: Authentication Proxy | 8/31/15 | 9/30/16 | Approved | Completed | | | | | $0 | | $99,400 | | | | | | | | | | High | BE - WE - Digital Media Agency (DMA) | ET Project Budget | New Capabilities | Kara | | 8/31/15 | Security | | | /Engineering Services/Professional Services/Digital Media Agency |
| PR03758 | DDM: SA - Data Security Website | 10/1/14 | 10/1/16 | Approved | Completed | | | | | $120,000 | | | | | | | | | | | | | BE - WE - Digital Media Agency (DMA) | Direct/Organizational Budget | | Kara | | 10/1/14 | Security | | |
|
| PR05417 | Salary.com replacement tool | 11/7/16 | 9/22/17 | Unapproved | Not Started | | | | | | | | | $50,000 | $100,000 | | | | | | | | BE - CE - Human Resources | Corp Dept Allocated | New Capabilities | Shawn | | 7/13/16 | Other | | |
|
| PR05423 | Compensation platform Discovery | 6/1/17 | 9/29/17 | Unapproved | Not Started | | | | | | | | | $250,000 | | | | | | | | | BE - CE - Human Resources | Corp Dept Allocated | Foundational Improvement | Shawn | | 7/13/16 | Other | | |
|
| PR05411 | ITM Developmental Learning - Global Deployment Discovery | 11/7/16 | 6/16/17 | Unapproved | Not Started | | | | | | | | | $250,000 | | | | | | | | | BE - CE - Human Resources | Corp Dept Allocated | New Capabilities | Shawn | | 7/8/16 | Other | | |
|
| PR04327 | Contingent Workforce Management | 5/9/16 | 10/30/17 | Unapproved | Not Started | | | | | | | | | $150,000 | $200,000 | | | | | | | | BE - CE - Human Resources | Corp Dept Allocated | New Capabilities | Shawn | | 5/11/15 | Other | | |
|
| PR05419 | Abstract layer for User Experience | 1/2/17 | 8/31/17 | Unapproved | Not Started | | | | | | | | | $150,000 | $350,000 | | | | | | | | BE - CE - Human Resources | Corp Dept Allocated | New Capabilities | Shawn | | 7/13/16 | Other | | |
|
| PR05422 | Analytics discovery for HR | 12/1/16 | 9/28/17 | Unapproved | Not Started | | | | | | | | | $150,000 | $350,000 | | | | | | | | BE - CE - Human Resources | Corp Dept Allocated | New Capabilities | Shawn | | 7/13/16 | Other | | |
|
| PR05420 | ITM Succession Modeling Tool | 10/3/16 | 2/22/18 | Unapproved | Not Started | | | | | | | | | $150,000 | $350,000 | | | | | | | | BE - CE - Human Resources | Corp Dept Allocated | New Capabilities | Shawn | | 7/13/16 | Other | | |
|
| PR05630 | Talent Relationship Management Application | 11/14/16 | 6/30/17 | Unapproved | Not Started | | | | | | | | | $605,000 | | | | | | | | | BE - CE - Human Resources | Corp Dept Allocated | New Capabilities | Shawn | | 10/11/16 | Other | | |
|
| PR05424 | HCM Analysis Deep Dive | 1/2/17 | 6/30/17 | Unapproved | Not Started | | | | | | | | | $700,000 | | | | | | | | | BE - CE - Human Resources | Corp Dept Allocated | New Capabilities | Shawn | | 7/13/16 | Other | | |
|
| PR04328 | Employee Survey - Internal Capability | 5/16/16 | 3/2/18 | Unapproved | Not Started | | | | | | | $187,000 | $563,000 | | | | | | | | | | BE - CE - Human Resources | Direct Billed | New Capabilities | Shawn | | 5/11/15 | Other | | |
|
| PR05421 | Replace current Fidelity Total Rewards System | 12/1/16 | 9/29/17 | Unapproved | Not Started | | | | | | | | | $300,000 | $750,000 | | | | | | | | BE - CE - Human Resources | Corp Dept Allocated | Foundational Improvement | Shawn | | 7/13/16 | Other | | |
|
| PR02610 | Global Mobility Implementation | 10/4/13 | 3/1/18 | Approved | Started | | | | | $83,000 | $137,000 | $55,000 | $75,000 | $291,450 | $516,245 | | | | | | | | BE - CE - Human Resources | Corp Dept Allocated | New Capabilities | Shawn | | 8/27/13 | Cloud Accelerator | | /TWDC Corporate (1032)/HR (1811) |
|
| PR04341 | Compensation Platform - Integrated Talent Management | 11/9/15 | 2/16/18 | Approved | Started | | | | | | | $138,000 | $967,000 | $21,700 | $100,000 | | $0 | | | | | | BE - CE - Human Resources | Corp Dept Allocated | Foundational Improvement | Shawn | | 5/18/15 | Other | 1658566 | /Corporate Segment (1737) |
|
| PR05418 | HCM Core Implementation | 2/21/18 | 7/31/20 | Unapproved | Not Started | | | | | | | | | | | | | $1,440,000 | $1,920,000 | | | | BE - CE - Human Resources | Corp Dept Allocated | New Capabilities | Shawn | | 7/13/16 | Other | | |
|
| PR04249 | Integrated Talent Management Peformance, Goals, Career + Succession | 3/16/15 | 7/10/17 | Approved | Completed | | | | | $150,000 | $850,000 | $147,800 | $1,685,000 | $77,200 | $1,310,000 | | | | | | | | BE - CE - Human Resources | Corp Dept Allocated | New Capabilities | Shawn | | 4/22/15 | Other | 3029480 | |
|
| PR04960 | Marvel and ESPN Workforce Tech Transition | 11/2/15 | 10/25/16 | Approved | Completed | | | | | | | $170,037 | | $0 | | | | | | | | High | Business Enablement | ET Project Budget | Foundational Improvement | Andrew | | 1/12/16 | Corporate Customer Driven | | |
|
| PR05965 | FY17 - 820 Flower Tech Refresh Phase 2 | 5/2/17 | 9/30/17 | Approved | Completed | | | | | | | | | | | $37,480 | | | | | | High | BE - WE - Workplace Services | ET Project Budget | Foundational Improvement | Kevin | | 5/2/17 | Other | | |
|
| PR04538 | FY15-16 Lync 2013 Project | 8/1/15 | 12/1/16 | Approved | Completed | | | | | | | $217,859 | | $9,774 | | | | | | | | High | BE - WE - Workplace Services | ET Project Budget | Lights On | Kevin | | 7/21/15 | Workforce Enablement | | |
|
| PR05662 | FY17 - VTC Refresh | 10/1/16 | 2/15/18 | Approved | Completed | | | | | | | | | $0 | $3,191,232 | | $0 | | | | | High | BE - WE - Workplace Services | Direct/Organizational Budget | Foundational Improvement | Kevin | | 10/31/16 | Other | | |
|
| PR05768 | FY17 BDC – UPS 3 Control Board Upgrade | 3/1/17 | 4/4/17 | Approved | Completed | | | | | | | | | | $38,413 | | | | | | | | EIS - Ops & Service Delivery | Direct/Organizational Budget | Lights On | George I | | 1/22/17 | Other | | |
|
| PR04820 | FY16 BDC-Main Utility Breaker Replacement | 12/1/15 | 4/14/16 | Approved | Completed | | | | | | | | $79,000 | | | | | | | | | | EIS - Ops & Service Delivery | ET Project Budget | Lights On | George I | | 11/9/15 | Continuous Availability | | |
|
| PR04135 | ES: IDENTITY: Disney ID: Onboarding: Disney Stores | 2/16/15 | 10/16/15 | Approved | Completed | | | | | $300,094 | | | | | | | | | | | | | EAS - Identity and Commerce Systems | Direct/Organizational Budget | | Joel | | 2/23/15 | Other | | |
|
| PR02220 | ES: IDENTITY: Disney ID: PAR: Compliance | 4/25/13 | 10/12/15 | Approved | Completed | | | | | $464,310 | $582,120 | | | | | | | | | | | | EAS - Identity and Commerce Systems | Direct/Organizational Budget | | Joel | | 4/25/13 | Disney ID | | |
|
| PR04079 | ES: IDENTITY: Disney ID: PAR: Compliance Ph 2 | 3/23/15 | 10/16/15 | Approved | Completed | | | | | $464,310 | $582,120 | | | | | | | | | | | | EAS - Identity and Commerce Systems | Direct/Organizational Budget | | Joel | | 1/30/15 | Disney ID | | |
|
| PR04069 | ES: IDENTITY: Disney ID: PAR: ESPN | 10/1/14 | 6/30/15 | Approved | Completed | | | | | $723,690 | $462,660 | | | | | | | | | | | | EAS - Identity and Commerce Systems | Direct/Organizational Budget | | Joel | | 1/28/15 | Disney ID | | |
|
| PR04070 | ES: IDENTITY: Disney ID: PAR: Parks & Resorts | 10/1/14 | 6/30/15 | Approved | Completed | | | | | $1,169,619 | $346,731 | | | | | | | | | | | | EAS - Identity and Commerce Systems | Direct/Organizational Budget | | Joel | | 1/28/15 | Disney ID | | |
|
| PR04082 | ES: IDENTITY: PAR: Social Networking & SSO | 2/2/15 | 10/1/16 | Approved | Completed | | | | | $112,722 | $139,894 | | $1,604,424 | | | | | | | | | | EAS - Identity and Commerce Systems | Direct/Organizational Budget | New Capabilities | Joel | | 1/30/15 | Disney ID | | | /Engineering Services/Guest Identity Services |
| PR01060 | ICS: Disney ID, Phase 1 | 1/26/12 | 8/24/17 | Approved | Completed | | | | | $0 | $1,932,000 | $0 | | $0 | | | | | | | | | EAS - Identity and Commerce Systems | Direct/Organizational Budget | | Joel | | 1/26/12 | Other | | |
|
| PR04080 | ES: IDENTITY: Disney ID: PAR: Disney ID Product Evolution | 2/2/15 | 6/30/15 | Approved | Completed | | | | | | $2,367,235 | | | | | | | | | | | | EAS - Identity and Commerce Systems | Direct/Organizational Budget | | Joel | | 1/30/15 | Disney ID | | |
|
| PR04219 | ES: IDENTITY: OneID: Product: Enhancements | 3/11/15 | 3/16/18 | Approved | Completed | | | | | | | | $11,734,964 | | $1,415,636 | | | | | | | | EAS - Identity and Commerce Systems | Direct/Organizational Budget | Foundational Improvement | Joel | | 4/2/15 | Other | | |
|
| PR06329 | FY18 HANA Decommissioning Acceleration | 10/1/17 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | | $600,000 | | | | | High | EBS - Data | ET Project Budget | Foundational Improvement | John K | | 7/19/17 | Strategic Data Accelerator | | |
|
| PR06328 | Torch Platform Foundation - Viability & Go-Live | 7/19/17 | 3/31/18 | Unapproved | Not Started | | | | | | | | | | | | $900,000 | | | | | High | EBS - Data | ET Project Budget | Foundational Improvement | John K | | 7/19/17 | Strategic Data Accelerator | | |
|
| PR04278 | PE: Tableau Server Growth and Redundancy | 6/1/16 | 9/28/19 | Approved | Completed | | | | | | | $34,884 | $431,600 | $0 | | $0 | | $0 | | | | High | EBS - Data | ET Project Budget | Foundational Improvement | Joe K | | 5/6/15 | Other | | /Corporate Segment (1737) | /Enterprise Data Solutions and Services/Business Intelligence & Analytics Services/BI Reporting and Visualization Solutions |
| PR01091 | Anaqua Trademark Management System Replacement | 2/1/16 | 9/29/17 | Approved | Completed | | | | | | | $40,080 | $76,166 | $258,450 | $281,604 | | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | safia | | 2/13/12 | Corporate Customer Driven | | /TWDC Corporate (1032)/Legal (1805) | /Enabling Functions/Technology Business Operations and Strategy/Client Engagement |
| PR03899 | Data Management Platform (DMP) - Media Selling - Capital Only | 12/1/14 | 4/26/17 | Approved | Completed | | | | | | $460,000 | | $820,000 | $0 | $0 | | | | | | | High | Enterprise Data | ET Project Budget | New Capabilities | Tom K | | 10/29/14 | Personalization and Consumer ID | | |
|
| PR06622 | Canada SAP Time & Payroll | 3/1/18 | 12/31/18 | Unapproved | Not Started | | | | | | | | | | | $16,100 | $309,400 | $6,900 | $132,600 | | | | EBS - HCM | Direct Billed | Foundational Improvement | Koukeyan, Paul | | 11/15/17 | Other | | |
|
| PR05023 | SWIFT Alliance Lite 2 Discovery | 3/1/16 | 2/19/17 | Approved | Completed | | | | | | | | | $44,000 | | | | | | | | High | EBS - Shared Services | ET Project Budget | Foundational Improvement | Art | | 3/3/16 | Strategy-Innovation-R&D | 130913 | |
|
| PR05711 | SAP Middleware Ariba Components Upgrade | 12/12/16 | 5/31/17 | Approved | Completed | | | | | | | | | $55,000 | | | | | | | | High | EBS - Shared Services | ET Project Budget | Lights On | Art | | 12/5/16 | Continuous Availability | | |
|
| PR05364 | SAP Middleware Oracle 12c Upgrade | 7/4/16 | 8/11/17 | Approved | Completed | | | | | | | | | $80,000 | | | | | | | | High | EBS - Shared Services | ET Project Budget | Lights On | Art | | 6/22/16 | Continuous Availability | 45000 | |
|
| PR05363 | Corporate EDI webMethods Upgrade | 8/1/16 | 11/6/17 | Approved | Completed | | | | | | | | | $110,000 | | $0 | | | | | | High | EBS - Shared Services | ET Project Budget | Lights On | Art | | 6/22/16 | Continuous Availability | 191250 | |
|
| PR04253 | WebMethods for eDocs and Archivelink Upgrade | 8/1/15 | 11/10/16 | Approved | Completed | | | | | $0 | $0 | $50,026 | $164,736 | $0 | | | | | | | | High | EBS - Shared Services | ET Project Budget | Lights On | Art | | 4/23/15 | Continuous Availability | 611825 | | /Business Applications Services |
| PR04112 | WebMethods Modernization - Shuttle Replacement Phase 2 | 3/2/15 | 9/30/16 | Approved | Completed | | | | | $153,626 | | $104,014 | | | | | | | | | | High | EBS - Shared Services | ET Project Budget | Foundational Improvement | Art | | 2/12/15 | Other | | | /Business Applications Services |
| PR04944 | SAP Middleware webMethods Core Instance Upgrade | 3/1/15 | 6/22/17 | Approved | Completed | | | | | | | $360,000 | | $246,000 | | | | | | | | High | EBS - Shared Services | ET Project Budget | Lights On | Art | | 12/21/15 | Continuous Availability | 322500 | |
|
| PR03109 | IPR Migration to MDM | 4/1/14 | 12/31/15 | Approved | Completed | | | | | $11,805 | $296,410 | $8,475 | | | | | | | | | | | ED - Governance | ET Project Budget | Foundational Improvement | Barbara K | | 3/6/14 | Strategic Data Accelerator | | /DCP Licensing (1728) | /Business Applications Services/Global Business Applications/Brand Management Applications |
| PR04928 | Enterprise Hadoop Strategy-PAR#1-Deloitte | 12/7/15 | 6/24/16 | Approved | Completed | | | | | | | $382,500 | | | | | | | | | | | ED - Governance | ET Project Budget | Foundational Improvement | Barbara K | | 12/9/15 | Other | | |
|
| PR03996 | CTaM Enhancement& Staffing | 12/1/14 | 12/27/16 | Approved | Completed | | | | | $127,278 | $511,000 | $218,119 | $415,000 | | $0 | | | | | | | | ED - Governance | ET Project Budget | Lights On | Barbara K | | 12/16/14 | Strategic Data Accelerator | | /TWDC Corporate (1032) | /Business Applications Services/Global Business Applications/Brand Management Applications |
| PR05084 | MyID Federation Adoption - Ops Transition | 3/24/16 | 4/21/17 | Approved | Completed | | | | | | | $240,000 | | $0 | | | | | | | | High | Identity & Access Management (IAM) | ET Project Budget | Foundational Improvement | Lam | | 4/11/16 | Security | 587748 | |
|
| PR04495 | FY16 Third Party Assessment Services | 1/4/16 | 10/30/17 | Approved | Completed | | | | | | | $124,253 | | $158,551 | | $0 | | | | | | High | Information Security Governance, Risk Management & Compliance | ET Project Budget | Foundational Improvement | Lam | | 7/6/15 | Security | | |
|
| PR03305 | Supplier Management Portal | 5/16/14 | 12/31/16 | Approved | Started | | | | | $50,000 | | $0 | | $50,000 | | | | | | | | High | EBS - HCM | Direct Billed | New Capabilities | Russell | | 5/16/14 | Other | 440000 | |
|
| PR06124 | FY18 KMTC DPF Repair and Remediation | 5/1/18 | 7/1/18 | Unapproved | Not Started | | | | | | | | | | | $560,000 | | | | | | High | EIS - Ops & Service Delivery | ET Project Budget | Service Risk | Jim L | | 6/7/17 | Continuous Availability | | |
|
| PR05325 | FY17 Container Management | 1/1/17 | 9/21/17 | Unapproved | Not Started | | | | | | | | | $295,000 | | | | | | | | Medium | EIS - Digital Operations | ET Project Budget | New Capabilities | Chris L | | 6/21/16 | Other | | |
|
| PR04440 | FY16-17 Extend Cloud security & Governance Program | 4/1/17 | 9/15/17 | Unapproved | Not Started | | | | | | | $0 | | $540,000 | | | | | | | | High | EIS - Digital Operations | ET Project Budget | Foundational Improvement | Chris L | | 6/16/15 | Security | | |
|
| PR03313 | Add Workforce Classification to SAP Position | 1/30/14 | 2/2/15 | Approved | Completed | | | | | $4,400 | | | | | | | | | | | | | EBS - Shared Services | Direct Billed | | LeBar | | 5/21/14 | Other | | |
|
| PR04904 | FY16: GS: CM - Everbridge Enhancement | 11/16/15 | 9/30/16 | Approved | Completed | | | | | | | $15,000 | | | | | | | | | | | BE - CE - Global Security | Corp Dept Allocated | | Anthony L | | 11/23/15 | Other | | /TWDC Corporate (1032)/Security (1806) |
|
| PR04572 | FY15: GS: Higher Ground System Upgrade | 8/10/15 | 9/30/15 | Approved | Completed | | | | | $22,000 | | | | | | | | | | | | | BE - CE - Global Security | Direct Billed | | Anthony L | | 8/13/15 | Other | | /TWDC Corporate (1032)/Security (1806) |
|
| PR04525 | FY15: IP - Content Protection Security Policies | 7/1/15 | 2/29/16 | Approved | Completed | | | | | | | $40,000 | | | | | | | | | | | BE - CE - Global Security | Corp Dept Allocated | | Anthony L | | 7/14/15 | Other | | /TWDC Corporate (1032)/Security (1806) |
|
| PR04571 | FY15: GS: GCC - Global Emergency Notification System - PA Equipment | 8/17/15 | 9/30/15 | Approved | Completed | | | | | $43,000 | | | | | | | | | | | | | BE - CE - Global Security | Direct Billed | | Anthony L | | 8/13/15 | Other | | /TWDC Corporate (1032)/Security (1806) |
|
| PR04829 | FY16: GS: GSI - Perspective 5.0 Upgrade | 4/1/16 | 9/30/16 | Approved | Completed | | | | | | | $48,000 | | | | | | | | | | | BE - CE - Global Security | Corp Dept Allocated | New Capabilities | Anthony L | | 11/11/15 | Other | | /TWDC Corporate (1032)/Security (1806) |
|
| PR04812 | FY16: GS: GSI - Perspective EMEA | 3/1/16 | 9/30/16 | Approved | Completed | | | | | | | $49,000 | | | | | | | | | | | BE - CE - Global Security | Corp Dept Allocated | New Capabilities | Anthony L | | 11/6/15 | Other | | /TWDC Corporate (1032)/Security (1806) |
|
| PR03395 | GS: GSI - Perspective Enhancements | 6/2/14 | 7/9/15 | Approved | Completed | | | | | $62,670 | | | | | | | | | | | | | BE - CE - Global Security | Direct Billed | | Anthony L | | 6/12/14 | Other | | /TWDC Corporate (1032)/Security (1806) |
|
| PR04935 | FY16: GS: CM - Everbridge Incident Management (added) | 11/16/15 | 1/30/16 | Approved | Completed | | | | | | | $75,102 | | | | | | | | | | | BE - CE - Global Security | Corp Dept Allocated | | Anthony L | | 12/15/15 | Other | | /TWDC Corporate (1032)/Security (1806) |
|
| PR05406 | FY17: GS: GSI - Perspective - SAP Integration | 1/15/17 | 9/30/17 | Unapproved | Not Started | | | | | | | | | $80,000 | | | | | | | | | BE - CE - Global Security | Direct Billed | New Capabilities | Anthony L | | 7/7/16 | Other | | /TWDC Corporate (1032)/Security (1806) |
|
| PR04188 | FY15: GS: CM -Digitial Monitor and Video Equipment Upgrade for EOC | 11/3/14 | 12/23/16 | Approved | Completed | | | | | | $105,000 | | $45,000 | | $0 | | | | | | | | BE - CE - Global Security | Corp Dept Allocated | | Anthony L | | 3/23/15 | Other | | /TWDC Corporate (1032)/Security (1806) |
|
| PR05408 | FY17: GS: CW - Community Watch Report and Request Destination Page | 2/2/17 | 9/30/17 | Unapproved | Not Started | | | | | | | | | $200,000 | | | | | | | | | BE - CE - Global Security | Direct Billed | New Capabilities | Anthony L | | 7/7/16 | Other | | /TWDC Corporate (1032)/Security (1806) |
|
| PR04157 | ES: Seattle Workspace Remodel:Sub:Operating | 10/1/14 | 9/30/16 | Approved | Completed | | | | | | | $50,000 | $250,000 | | | | | | | | | High | EAS - Engineering | ET Project Budget | Foundational Improvement | Eric | | 3/9/15 | Other | | |
|
| PR04583 | ES: Furniture for 9 & Move Expense | 10/5/15 | 9/30/16 | Approved | Completed | | | | | | | $150,000 | $909,500 | | | | | | | | | High | EAS - Engineering | ET Project Budget | Lights On | Eric | | 8/14/15 | Keep the Lights On | | |
|
| PR06832 | APS: eDOCS Stabilization and Remediation Planning | 4/2/18 | 4/14/19 | Unapproved | Not Started | | | | | | | | | | | $336,540 | $112,459 | $427,635 | $23,920 | | | | BE - WE - APS | ET Project Budget | Security | Cynthia | | 3/20/18 | Other | | |
|
| PR04489 | Segmentation of PCI Devices on TWDC Network | 2/15/16 | 2/22/18 | Approved | Completed | | | | | | | $96,692 | $574,656 | $1,027,322 | $491,035 | $0 | $0 | | | | | High | Information Security Governance, Risk Management & Compliance | ET Project Budget | Lights On | Dennis | | 7/6/15 | Security | | |
|
| PR04305 | ED: SAP BW Data Source 7.x Conversion | 10/5/15 | 5/27/16 | Approved | Completed | | | | | | | $43,967 | | | | | | | | | | | ED - Data Solutions - BI & Reporting | Corp Dept Allocated | Lights On | Shelley | | 5/8/15 | Other | | | /Enterprise Data Solutions and Services/Business Intelligence & Analytics Services/BI Reporting and Visualization Solutions |
| PR04961 | BW 7.4 Upgrade | 1/1/16 | 8/18/16 | Approved | Completed | | | | | | | $142,187 | | | | | | | | | | | Enterprise Business Systems | ET Project Budget | Lights On | Shelley | | 1/13/16 | Other | | |
|
| PR03887 | CNRG Hub – NRG Replacement | 9/2/14 | 4/13/16 | Approved | Completed | | | | | | $785,025 | $0 | | | | | | | | | | | Business Enablement | Direct Billed | | Duke | | 10/23/14 | Other | | |
|
| PR04634 | Continuous Improvement Support | 9/21/15 | 3/25/16 | Approved | Completed | | | | | | | $58,182 | | | | | | | | | | High | Business Enablement | ET Project Budget | New Capabilities | Holly | | 9/11/15 | Other | | |
|
| PR04053 | Disney ID: IUR Marketing Permissions Migration | 1/8/15 | 8/31/15 | Approved | Completed | | | | | $225,886 | | | | | | | | | | | | | EAS - Identity and Commerce Systems | Direct/Organizational Budget | | Karena | | 1/15/15 | Other | | |
|
| PR04965 | Enterprise Payments Technical Resource | 2/1/16 | 9/30/16 | Approved | Completed | | | | | | | $187,000 | | | | | | | | | | High | EBS - Treasury - ECP | ET Project Budget | New Capabilities | Rebecca | | 1/15/16 | Strategy-Innovation-R&D | | /Corporate Segment (1737) |
|
| PR04195 | eDiscovery - Implement eDiscovery Task Tracking / Project Management Solution | 3/2/15 | 4/29/16 | Approved | Completed | | | | | $15,275 | | $15,275 | | | | | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Tessa | | 3/24/15 | Other | | |
|
| PR04194 | eDiscovery: Replace Legal Hold Software | 4/3/17 | 9/28/18 | Approved | Started | | | | | | | | | | | $147,875 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Tessa | | 3/24/15 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR02944 | FY16: TRIRIGA Platform Upgrade | 11/1/15 | 9/7/16 | Approved | Completed | | | | | | | $80,000 | | | | | | | | | | | BE - CE - CRE-Facil-Ctrls | Direct Billed | Lights On | Craig M | | 12/11/13 | Other | | |
|
| PR05006 | FY16: GS: CM - Everbridge Urgent Desktop Notification: AlertUS | 8/1/16 | 5/18/17 | Approved | Started | | | | | | | $152,858 | | $78,500 | | | | | | | | | BE - CE - Global Security | Corp Dept Allocated | New Capabilities | Craig M | | 2/17/16 | Other | | /TWDC Corporate (1032)/Security (1806) |
|
| PR03986 | FY15 TRIRIGA Mobility Implementation | 9/15/15 | 4/30/17 | Approved | Completed | | | | | $12,000 | | $102,200 | $321,080 | | | | | | | | | High | BE - CE - CRE-Facil-Ctrls | Corp Dept Allocated | New Capabilities | Craig M | | 12/9/14 | Other | 720000 | /TWDC Corporate (1032)/Core (1800) |
|
| PR04564 | FSS Parking Planning Enforcement Implementation | 11/7/16 | 2/22/18 | Approved | Started | | | | | | | | | $147,000 | $518,000 | | $0 | | | | | | BE - CE - CRE-Facil-Ctrls | Corp Dept Allocated | New Capabilities | Craig M | | 8/11/15 | Other | 401000 | |
|
| PR03179 | Technology Offering Portfolio Lifecycle Launch | 4/8/14 | 9/30/15 | Approved | Completed | | | | | $260,000 | | | | | | | | | | | | | Business Enablement | Direct/Organizational Budget | | Melanie | | 4/8/14 | Other | | |
|
| PR03744 | ES: CMS: Archimedes: Product: Archimedes | 9/28/14 | 3/23/20 | Approved | Started | | | | | $691,250 | | $276,000 | | $10,000 | | | | | | | | | EAS - Content Management Systems | Direct/Organizational Budget | | McGilton | | 9/30/14 | Other | | /ABC Digital Media Product and Design (1002) |
|
| PR05946 | 820 S. Flower DTSS Consolidation | 5/15/17 | 9/29/17 | Approved | Completed | | | | | | | | | $120,654 | $440,000 | | | | | | | High | EIS - Infrastructure Eng & Design | ET Project Budget | Foundational Improvement | Nilik | | 4/24/17 | Other | | |
|
| PR04494 | Consumer Database Protection | 10/1/15 | 9/30/16 | Approved | Completed | | | | | | | $335,000 | | | | | | | | | | High | Information Security Architecture & Engineering | ET Project Budget | Foundational Improvement | Cynthia M | | 7/6/15 | Security | | |
|
| PR04321 | Personalization - Consumer Identity Unification Discovery | 10/1/15 | 11/22/17 | Approved | Started | | | | | | | $654,120 | | $0 | | | | | | | | High | EAS - Personalization | Direct/Organizational Budget | New Capabilities | Saral | | 5/8/15 | Personalization and Consumer ID | | |
|
| PR05916 | Alliant Expansion DI | 10/1/17 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $100,000 | | | | | | | EBS - Publishing | Direct/Organizational Budget | New Capabilities | Marianne | | 4/6/17 | Other | | |
|
| PR06035 | Contract Management for DBG | 10/1/17 | 9/29/18 | Approved | Not Started | | | | | | | | | | | $100,000 | | | | | | | EBS - Publishing | Direct/Organizational Budget | Lights On | Marianne | | 5/25/17 | Other | | |
|
| PR06162 | PUBS Modernization | 10/1/17 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $100,000 | | | | | | | EBS - Publishing | Direct/Organizational Budget | Foundational Improvement | Marianne | | 6/13/17 | Other | | |
|
| PR05911 | DMC Search Tool Upgrade (Licensing & Publishing split) | 1/1/17 | 7/1/17 | Approved | Started | | | | | | | | | $0 | $91,000 | $20,000 | | | | | | | EBS - Publishing | Direct/Organizational Budget | Foundational Improvement | Marianne | | 4/6/17 | Other | | |
|
| PR06045 | Multi-Factor Authentication | 12/31/17 | 9/29/18 | Approved | Not Started | | | | | | | | | | | $20,000 | $100,000 | | | | | | EBS - Publishing | Direct/Organizational Budget | Lights On | Marianne | | 5/25/17 | Other | | |
|
| PR05913 | DBG BI (Shipments in RADW) | 10/2/17 | 12/30/17 | Unapproved | Started | | | | | | | | | | | $58,000 | $100,000 | | | | | | EBS - Publishing | Direct/Organizational Budget | Foundational Improvement | Marianne | | 4/6/17 | Other | | |
|
| PR05918 | Archive (TRIPS) | 7/3/17 | 12/30/17 | Unapproved | Not Started | | | | | | | | | | | $50,000 | $150,000 | | | | | | EBS - Publishing | Direct/Organizational Budget | Lights On | Marianne | | 4/6/17 | Other | | |
|
| PR06040 | Global Ad Marketing | 7/2/17 | 9/30/17 | Approved | Not Started | | | | | | | | | | $300,000 | | | | | | | | EBS - Publishing | Direct/Organizational Budget | Lights On | Marianne | | 5/25/17 | Other | | |
|
| PR05912 | Vertical Dashboards / Visualization | 7/3/17 | 3/31/18 | Unapproved | Started | | | | | | | | | | | $72,000 | $250,000 | | | | | | EBS - Publishing | Direct/Organizational Budget | New Capabilities | Marianne | | 4/6/17 | Other | | |
|
| PR06159 | Artwork Creation ROI | 10/2/17 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $100,000 | $275,000 | | | | | | EBS - Publishing | Direct/Organizational Budget | New Capabilities | Marianne | | 6/13/17 | Other | | |
|
| PR05914 | Alliant (outbound royalties) Implementation | 4/3/17 | 12/31/17 | Unapproved | Not Started | | | | | | | | | | | $275,000 | $200,000 | | | | | | EBS - Publishing | Direct/Organizational Budget | Lights On | Marianne | | 4/6/17 | Other | | |
|
| PR06037 | Project Brave Phase 1 | 10/1/17 | 9/29/18 | Approved | Not Started | | | | | | | | | | | $100,000 | $400,000 | | | | | | EBS - Publishing | Direct/Organizational Budget | New Capabilities | Marianne | | 5/25/17 | Other | | |
|
| PR05920 | PUBWorld Modernization | 10/2/17 | 6/30/18 | Unapproved | Not Started | | | | | | | | | | | $200,000 | $1,100,000 | | | | | | EBS - Publishing | Direct/Organizational Budget | New Capabilities | Marianne | | 4/6/17 | Other | | |
|
| PR04503 | IDR Data Management & Controls | 2/1/16 | 11/17/16 | Approved | Completed | | | | | | | $50,000 | | $0 | | | | | | | | High | Identity & Access Management (IAM) | ET Project Budget | Foundational Improvement | Mark N | | 7/6/15 | Security | | |
|
| PR04487 | MyID/Federation Adoption | 2/1/16 | 4/21/17 | Approved | Completed | | | | | | | $10,000 | $225,000 | | $0 | | | | | | | High | Identity & Access Management (IAM) | ET Project Budget | Foundational Improvement | Mark N | | 7/6/15 | Security | 587748 | |
|
| PR03932 | IAM - AccessCentral Provisioning | 10/1/14 | 9/30/15 | Approved | Completed | | | | | $100,000 | $150,000 | | | | | | | | | | | | Identity & Access Management (IAM) | ET Project Budget | | Mark N | | 11/10/14 | Security | | |
|
| PR05351 | IAM: MyID Federation Adoption (FY17) | 10/3/16 | 9/29/17 | Approved | Completed | | | | | | | | | $250,000 | | | | | | | | High | Identity & Access Management (IAM) | ET Project Budget | Foundational Improvement | Mark N | | 6/21/16 | Security | | |
|
| PR04421 | Multi-Factor Federation | 6/9/15 | 11/21/16 | Approved | Completed | | | | | | | $45,303 | $437,597 | $0 | | | | | | | | High | Identity & Access Management (IAM) | ET Project Budget | Foundational Improvement | Mark N | | 6/9/15 | Security | 587748 | |
|
| PR06244 | FileMaker Pro: CLE Update - Phase 1 | 7/3/17 | 10/10/17 | Approved | Started | | | | | | | | | $2,900 | | $0 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Kevin No | | 6/20/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06650 | APPG: SalesForce Sandbox | 11/27/17 | 12/13/17 | Approved | Completed | | | | | | | | | | | $3,184 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Kevin No | | 12/13/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06814 | Legal Insider: On Demand (FY18) - Neudesic Enhancement | 4/2/18 | 5/31/18 | Unapproved | Not Started | | | | | | | | | | | $4,000 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Kevin No | | 3/14/18 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05074 | Copyright Scan Sheets | 5/22/17 | 12/30/17 | Approved | Completed | | | | | | | | | $5,000 | | | | | | | | | BE- CE - BTP - Legal | Direct Billed | New Capabilities | Kevin No | | 4/11/16 | Other | | /Corporate Segment (1737) | /Business Applications Services/Global Business Applications/Legal Applications |
| PR06554 | FileMaker Pro: CLE Update - Phase 2 | 10/30/17 | 3/16/18 | Approved | Completed | | | | | | | | | | | $6,120 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Kevin No | | 10/13/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05122 | APDM: ABL Portal | 8/15/16 | 4/27/18 | Approved | Started | | | | | | | | | $0 | | $7,238 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Kevin No | | 4/12/16 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05589 | ES: IDENTITY: OneID: FY17 CapEx - Compliance | 10/2/16 | 12/30/17 | Approved | Started | | | | | | | | | | $1,301,075 | | | | | | | High | EAS - Identity and Commerce Systems | Direct/Organizational Budget | Foundational Improvement | Alex | | 9/27/16 | Personalization and Consumer ID | | |
|
| PR05590 | ES: IDENTITY: OneID: FY17 CapEx - Security | 10/2/16 | 12/30/17 | Approved | Started | | | | | | | | | | $1,301,075 | | | | | | | High | EAS - Identity and Commerce Systems | Direct/Organizational Budget | Foundational Improvement | Alex | | 9/27/16 | Personalization and Consumer ID | | |
|
| PR05591 | ES: IDENTITY: OneID: FY17 CapEx - Capability Advancement | 10/2/16 | 12/30/17 | Approved | Started | | | | | | | | | | $2,602,150 | | | | | | | High | EAS - Identity and Commerce Systems | Direct/Organizational Budget | New Capabilities | Alex | | 9/27/16 | Personalization and Consumer ID | | |
|
| PR06632 | FileMaker Pro: CLE Update - Phase 3 | 4/16/18 | 5/25/18 | Unapproved | Not Started | | | | | | | | | | | $8,160 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Kevin No | | 11/16/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06744 | Anaqua: Enhancements (FY18) - Clearance Upload | 3/19/18 | 5/18/18 | Unapproved | Not Started | | | | | | | | | | | $10,000 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Kevin No | | 2/8/18 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06558 | Anaqua: Enhancements (FY18) - Email Sender Enhancement | 3/6/18 | 7/31/18 | Unapproved | Started | | | | | | | | | | | $10,000 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Kevin No | | 10/13/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06696 | Mentoring Tool (Minder) | 2/12/18 | 3/30/18 | Approved | Not Started | | | | | | | | | | | $10,000 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Kevin No | | 1/23/18 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR04196 | eDiscovery - FY15 RMD / Exterro Upgrade and Ad Hoc Enhancement Bundle | 4/6/15 | 9/30/15 | Approved | Completed | | | | | $500 | | $10,000 | | | | | | | | | | | BE- CE - BTP - Legal | Corp Dept Allocated | | Kevin No | | 3/24/15 | Other | | |
|
| PR05237 | eDiscovery - RMD Upgrade to Version 4.8 | 6/27/16 | 7/8/16 | Approved | Completed | | | | | | | $10,750 | | | | | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Kevin No | | 5/25/16 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05115 | Anaqua: eDocs migration to either NetDocuments or Anaqua | 11/5/18 | 1/4/19 | Unapproved | Not Started | | | | | | | | | | | $30,000 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Kevin No | | 4/12/16 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06743 | Anaqua: Enhancements (FY18) - Sandbox Implementation | 3/1/18 | 4/20/18 | Unapproved | Not Started | | | | | | | | | | | $30,000 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Kevin No | | 2/8/18 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06629 | ANAQUA: ENHANCEMENTS (FY18) | 3/1/18 | 9/28/18 | Unapproved | Started | | | | | | | | | | | $35,000 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Kevin No | | 11/16/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06083 | Legal Insider: UI/UX Remediation - Implementation | 8/1/18 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $35,250 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Kevin No | | 5/29/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05238 | APDM - Title Tracker and Ad-hoc Requests - Discovery | 3/30/17 | 9/30/17 | Approved | Completed | | | | | | | | | $35,400 | | | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Kevin No | | 5/25/16 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05127 | APDM: Ad-hoc Requests - Implementation | 6/1/17 | 1/10/18 | Approved | Completed | | | | | | | | | $37,000 | | $0 | | | | | | | BE- CE - BTP - Legal | Direct Billed | New Capabilities | Kevin No | | 4/12/16 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06748 | Legal Insider: UGC Clearance - Implementation | 4/16/18 | 7/27/18 | Unapproved | Not Started | | | | | | | | | | | $37,440 | | | | | | | BE- CE - BTP - Legal | Direct Billed | New Capabilities | Kevin No | | 2/8/18 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06558 | Anaqua: Enhancements (FY18) - Email Sender Enhancement | 3/6/18 | 7/31/18 | Unapproved | Started | | | | | | | | | | | $10,000 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Kevin No | | 10/13/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06696 | Mentoring Tool (Minder) | 2/12/18 | 3/30/18 | Approved | Not Started | | | | | | | | | | | $10,000 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Kevin No | | 1/23/18 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06082 | Legal Insider: UI/UX Remediation - Discovery | 4/16/18 | 7/27/18 | Unapproved | Started | | | | | | | | | | | $50,000 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Kevin No | | 5/29/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06075 | Windows 10 / Office 2016 Training | 7/2/18 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $50,000 | | | | | | | BE- CE - BTP - Legal | Direct/Organizational Budget | Lights On | Kevin No | | 5/29/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05139 | RIM: Policy Portal | 7/10/17 | 4/27/18 | Approved | Started | | | | | | | | | $2,280 | | $48,375 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Kevin No | | 4/12/16 | Other | | /TWDC Corporate (1032)/RIM (1980) |
|
| PR06728 | LEGAL INSIDER: ON DEMAND (FY18) | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $58,060 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Kevin No | | 2/5/18 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR03932 | IAM - AccessCentral Provisioning | 10/1/14 | 9/30/15 | Approved | Completed | | | | | $100,000 | $150,000 | | | | | | | | | | | | Identity & Access Management (IAM) | ET Project Budget | | Mark N | | 11/10/14 | Security | | |
|
| PR05351 | IAM: MyID Federation Adoption (FY17) | 10/3/16 | 9/29/17 | Approved | Completed | | | | | | | | | $250,000 | | | | | | | | High | Identity & Access Management (IAM) | ET Project Budget | Foundational Improvement | Mark N | | 6/21/16 | Security | | |
|
| PR04421 | Multi-Factor Federation | 6/9/15 | 11/21/16 | Approved | Completed | | | | | | | $45,303 | $437,597 | $0 | | | | | | | | High | Identity & Access Management (IAM) | ET Project Budget | Foundational Improvement | Mark N | | 6/9/15 | Security | 587748 | |
|
| PR05138 | RIM: Record Declaration and Protection in Network Shares | 1/1/18 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $75,000 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Kevin No | | 4/12/16 | Other | | /TWDC Corporate (1032)/RIM (1980) |
|
| PR05696 | Legal Insider: Ad Hoc Enhancement Bucket (FY17) | 12/1/16 | 2/22/18 | Approved | Completed | | | | | | | | | $77,063 | | $0 | | | | | | | BE- CE - BTP - Legal | Direct Billed | New Capabilities | Kevin No | | 11/28/16 | Workforce Enablement | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05137 | RIM: Lifecycle Management Software - Discovery | 4/30/18 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $130,000 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Kevin No | | 4/12/16 | Other | | /TWDC Corporate (1032)/RIM (1980) |
|
| PR05972 | 2017 Integrated Retail Enhancements | 10/2/16 | 12/7/17 | Approved | Started | | | | | | | | | $0 | $228,100 | | $0 | | | | | | EBS - Integrated Retail | Direct/Organizational Budget | Foundational Improvement | Jennifer Ol | | 5/8/17 | Other | | |
|
| PR05589 | ES: IDENTITY: OneID: FY17 CapEx - Compliance | 10/2/16 | 12/30/17 | Approved | Started | | | | | | | | | | $1,301,075 | | | | | | | High | EAS - Identity and Commerce Systems | Direct/Organizational Budget | Foundational Improvement | Alex | | 9/27/16 | Personalization and Consumer ID | | |
|
| PR06040 | Global Ad Marketing | 7/2/17 | 9/30/17 | Approved | Not Started | | | | | | | | | | $300,000 | | | | | | | | EBS - Publishing | Direct/Organizational Budget | Lights On | Marianne | | 5/25/17 | Other | | |
|
| PR05912 | Vertical Dashboards / Visualization | 7/3/17 | 3/31/18 | Unapproved | Started | | | | | | | | | | | $72,000 | $250,000 | | | | | | EBS - Publishing | Direct/Organizational Budget | New Capabilities | Marianne | | 4/6/17 | Other | | |
|
| PR05590 | ES: IDENTITY: OneID: FY17 CapEx - Security | 10/2/16 | 12/30/17 | Approved | Started | | | | | | | | | | $1,301,075 | | | | | | | High | EAS - Identity and Commerce Systems | Direct/Organizational Budget | Foundational Improvement | Alex | | 9/27/16 | Personalization and Consumer ID | | |
|
| PR05591 | ES: IDENTITY: OneID: FY17 CapEx - Capability Advancement | 10/2/16 | 12/30/17 | Approved | Started | | | | | | | | | | $2,602,150 | | | | | | | High | EAS - Identity and Commerce Systems | Direct/Organizational Budget | New Capabilities | Alex | | 9/27/16 | Personalization and Consumer ID | | |
|
| PR05592 | ES: IDENTITY: OneID: FY17 CapEx - Enablement & Support | 9/27/16 | 12/30/17 | Approved | Started | | | | | | | | | | $2,602,150 | | | | | | | High | EAS - Identity and Commerce Systems | Direct/Organizational Budget | Foundational Improvement | Alex | | 9/27/16 | Personalization and Consumer ID | | |
|
| PR05593 | ES: IDENTITY: OneID: FY17 CapEx - Health & Resiliency | 10/2/16 | 12/30/17 | Approved | Started | | | | | | | | | | $2,602,150 | | | | | | | High | EAS - Identity and Commerce Systems | Direct/Organizational Budget | Foundational Improvement | Alex | | 9/27/16 | Personalization and Consumer ID | | |
|
| PR06288 | ES: IDENTITY: OneID: FY18 CapEx | 10/1/17 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | | $8,848,000 | | | | | High | EAS - Identity and Commerce Systems | Direct/Organizational Budget | Foundational Improvement | Alex | | 6/29/17 | Other | | |
|
| PR01618 | ILS System Replacement | 11/1/12 | 11/28/16 | Approved | Completed | | | | | $1,060,000 | $2,600,000 | $242,165 | $1,235,000 | | $0 | | | | | | | | Enterprise Business Systems | Direct Billed | New Capabilities | Jack | | 8/13/12 | Other | | /TWDC Corporate (1032)/Corporate Citizenship (1734) |
|
| PR05290 | Enterprise Digital Asset Search - PAR 10 - Last PAR | 4/3/17 | 9/29/17 | Approved | Completed | | | | | | | | | $20,000 | | | | | | | | High | Business Enablement | ET Project Budget | New Capabilities | vipul | | 6/2/16 | Strategy-Innovation-R&D | | |
|
| PR05753 | Enterprise Digital Asset Search - PAR 8 | 1/12/17 | 5/5/17 | Approved | Completed | | | | | | | | | $40,000 | | | | | | | | High | Business Enablement | ET Project Budget | New Capabilities | vipul | | 1/12/17 | Strategy-Innovation-R&D | | |
|
| PR05987 | Enterprise Digital Asset Search - PAR 10 - June,Half July 2017 | 6/1/17 | 7/15/17 | Approved | Started | | | | | | | | | $49,986 | | | | | | | | | Business Enablement | ET Project Budget | New Capabilities | vipul | | 5/15/17 | Other | | |
|
| PR05623 | Enterprise Digital Asset Search - PAR 6 | 10/1/16 | 3/23/17 | Approved | Completed | | | | | | | | | $50,000 | | | | | | | | High | Business Enablement | ET Project Budget | New Capabilities | vipul | | 10/5/16 | Strategy-Innovation-R&D | | /Corporate Segment (1737) | /Enabling Functions/Technology Business Operations and Strategy/Enterprise Strategy |
| PR05847 | FY17 - SharePoint Premium Modernization CapEx Reclass | 3/24/17 | 4/28/17 | Approved | Completed | | | | | | | | | $27,180 | | | | | | | | High | BE - WE - APS | ET Project Budget | Foundational Improvement | Tom | | 3/17/17 | Other | | |
|
| PR03211 | SharePoint Premium Modernization | 11/24/14 | 3/29/17 | Approved | Completed | | | | | $209,617 | $828,332 | $19,096 | | $27,180 | -$27,180 | | | | | | | High | BE - WE - APS | ET Project Budget | Foundational Improvement | Tom | | 4/28/14 | Other | 832990 | | /Workforce Technology/Enterprise Content Management/SharePoint Premium |
| PR05091 | Immigration Software: Replacement Implementation | 7/1/18 | 12/31/18 | Unapproved | Not Started | | | | | | | | | | | $45,000 | $60,000 | $45,000 | $60,000 | | | | BE- CE - BTP - Legal | Direct Billed | New Capabilities | Project Manager 1, CE Legal | | 4/11/16 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05103 | Migrate Records in Livelink to IM Connect | 8/20/17 | 3/19/18 | Approved | Completed | | | | | | | | | | | $14,699 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Lights On | Project Manager 2, CE Legal | | 4/11/16 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR04438 | FY16 - ACN2.0 - Network infrastructure API services | 2/1/16 | 9/30/16 | Unapproved | Completed | | | | | | | $200,000 | | | | | | | | | | High | EIS - Infrastructure Eng & Design | ET Project Budget | Foundational Improvement | Raupp | | 6/16/15 | | | |
|
| PR02519 | Blue Jeans Conf Services | 8/1/13 | 10/15/14 | Approved | Completed | | | | | $188,572 | | | | | | | | | | | | | BE - WE - Workplace Services | Direct/Organizational Budget | | Scott R | | 7/16/13 | Other | | |
|
| PR03098 | FY14 - FY15 Client Service Emerging Technology | 3/17/14 | 8/1/17 | Approved | Completed | | | | | $1,138,800 | | $0 | | $0 | | | | | | | | Low | BE - WE - Workplace Services | ET Project Budget | New Capabilities | Scott R | | 2/28/14 | Other | | |
|
| PR04180 | SA - FY15 PST Remediation | 3/20/15 | 9/30/16 | Approved | Completed | | | | | $541,000 | $606,749 | $383,000 | $229,244 | | | | | | | | | High | BE - WE - Workplace Services | Direct/Organizational Budget | | Scott R | | 3/20/15 | Security | | |
|
| PR04320 | Personalization - Consumer Taxonomies-EPCOT POC | 9/1/16 | 2/28/17 | Approved | Completed | | | | | | | $175,000 | | $75,000 | | | | | | | | High | EAS - Personalization | Direct Billed | New Capabilities | Lisa | | 5/8/15 | Personalization and Consumer ID | | |
|
| PR06117 | FY17-18 ServiceNow Auto-Discovery Re-Deployment | 6/15/17 | 10/30/17 | Unapproved | Not Started | | | | | | | | | $61,600 | | $17,600 | | | | | | High | EIS - Program Mgmt and Governance | ET Project Budget | Service Improvement | Adrian | | 6/6/17 | Strategic Data Accelerator | | |
|
| PR06119 | FY18 Service Management Reporting DB Solution (Perspectium) | 12/1/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $320,000 | | | | | | High | EIS - Program Mgmt and Governance | ET Project Budget | Service Improvement | Adrian | | 6/6/17 | Strategic Data Accelerator | | |
|
| PR05152 | FY16 DWS Cloud Strategy Phase 0 | 4/14/16 | 8/19/16 | Approved | Completed | | | | | | | $376,250 | | | | | | | | | | High | Enterprise Infrastructure Svcs | ET Project Budget | New Capabilities | Adrian | | 4/14/16 | Cloud Accelerator | | |
|
| PR03988 | Upgrade eDOCS Databases SQL2008 Native Mode | 10/1/14 | 4/30/16 | Approved | Completed | | | | | $31,500 | | $3,000 | | | | | | | | | | High | BE - WE - APS | ET Project Budget | Lights On | Amy R | | 12/12/14 | Continuous Availability | | | /Workforce Technology/Enterprise Content Management/Document Management |
| PR03180 | OpenText eDocs Upgrade | 12/10/14 | 10/1/16 | Approved | Completed | | | | | $133,516 | $273,568 | $123,809 | $196,869 | | | | | | | | | High | BE - WE - APS | ET Project Budget | Lights On | Amy R | | 4/9/14 | Continuous Availability | | | /Workforce Technology/Enterprise Content Management/Document Management |
| PR04282 | Personalization: T3 Discovery (Tagging, Tools, and Technology) | 10/1/15 | 6/16/16 | Approved | Completed | | | | | | | $146,654 | | | | | | | | | | | EAS - Personalization | ET Project Budget | New Capabilities | Don | | 5/6/15 | Personalization and Consumer ID | | | /Enterprise Data Solutions and Services/Business Intelligence & Analytics Services |
| PR05356 | EA: IoT Enablement (FY17) | 3/1/17 | 10/20/17 | Approved | Completed | | | | | | | | | $30,000 | | $0 | | | | | | High | Enterprise Architecture | ET Project Budget | Foundational Improvement | Noella | | 6/21/16 | Security | | |
|
| PR06578 | Test Project w/ Noella as PM | 10/2/17 | 1/19/18 | Approved | Started | | | | | | | | | | | $40,000 | | | | | | | Enterprise Architecture & Global Information Security & Technology Risk Mgmt | Corp Dept Allocated | Foundational Improvement | Noella | | 10/17/17 | Other | | |
|
| PR04306 | Credit and Collections Global Reporting & Analytics | 3/31/17 | 12/29/17 | Unapproved | Not Started | | | | | | | | | $100,000 | $125,000 | | | | | | | | BE - CE - BTP - Finance | Corp Dept Allocated | New Capabilities | Dan | | 5/8/15 | Strategy-Innovation-R&D | | /TWDC Corporate (1032)/Treasury (1815) |
|
| PR05203 | Core HR HCM Assessment RFP | 5/16/16 | 9/16/16 | Approved | Completed | | | | | | | $226,000 | | | | | | | | | | | BE - CE - Human Resources | ET Project Budget | Foundational Improvement | Dan | | 5/13/16 | SAP Modernization | | /TWDC Corporate (1032)/HR (1811) |
|
| PR06234 | eCredit Ongoing Enhancements | 1/31/18 | 7/31/18 | Approved | Not Started | | | | | | | | | | | $150,000 | $150,000 | | | | | | BE - CE - BTP - Finance | Corp Dept Allocated | New Capabilities | Dan | | 6/19/17 | Cloud Accelerator | | /TWDC Corporate (1032)/Credit and Collections (1976) |
|
| PR06224 | Sales Portal Enhancements | 4/1/18 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $100,000 | $250,000 | | | | | | BE - CE - BTP - Finance | Direct Billed | New Capabilities | Dan | | 6/16/17 | Other | | /TWDC Corporate (1032)/Credit and Collections (1976) |
|
| PR04078 | TM1 ESPN Labor Planning Implementation | 2/16/15 | 9/25/15 | Approved | Completed | | | | | $100,000 | $400,000 | | | | | | | | | | | | EBS - FP&A | Direct Billed | New Capabilities | Brenda | | 1/29/15 | Other | | |
|
| PR04984 | Corporate Tax – Discovery for FY16 International Tax Projects | 2/1/16 | 4/15/16 | Approved | Completed | | | | | | | $15,600 | | | | | | | | | | | BE - CE - BTP - Finance | ET Project Budget | Foundational Improvement | Nick S | | 1/28/16 | Other | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR04040 | Corporate Tax - Sales and Use Tax SCOUT Tool | 2/15/16 | 6/30/16 | Approved | Completed | | | | | | | $24,000 | | | | | | | | | | High | BE - CE - BTP - Finance | Direct Billed | New Capabilities | Nick S | | 1/9/15 | Other | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR05188 | FY17 BitLocker Implementation (MDOP) | 1/9/17 | 1/26/18 | Approved | Completed | | | | | | | | | $36,826 | | $6,735 | | | | | | High | BE - WE - Workplace Services | ET Project Budget | Lights On | Michelle Sa | | 5/11/16 | Security | | | /Workforce Technology |
| PR05558 | Collaboration PAR FY16 | 9/9/16 | 9/30/16 | Approved | Started | | | | | | | | | $56,524 | | | | | | | | | BE - WE - Workplace Services | ET Project Budget | New Capabilities | Michelle Sa | | 9/9/16 | Other | | | /Workforce Technology |
| PR04448 | FY16 Lync EV - 820 Flower | 1/9/17 | 12/15/17 | Approved | Completed | | | | | | | $0 | | $65,000 | | $0 | | | | | | High | BE - WE - Workplace Services | ET Project Budget | Foundational Improvement | Michelle Sa | | 6/16/15 | Workforce Enablement | | /TWDC Corporate (1032) |
|
| PR05030 | ServiceNow - EasyVista Integration | 3/25/16 | 7/10/17 | Approved | Completed | | | | | | | $0 | | $71,260 | | | | | | | | High | BE - WE - Workplace Services | ET Project Budget | Foundational Improvement | Michelle Sa | | 3/10/16 | Workforce Enablement | | |
|
| PR05823 | FY17 ESPN Bunsen & Beaker Build Out | 2/17/17 | 5/31/17 | Approved | Completed | | | | | | | | | $5,000 | $85,000 | | | | | | | High | BE - WE - Workplace Services | ET Project Budget | New Capabilities | Michelle Sa | | 2/28/17 | Workforce Enablement | | |
|
| PR03611 | FY15 - Files Services Tier 3 Migration | 1/14/15 | 8/9/16 | Approved | Completed | | | | | $48,513 | | $46,879 | | | | | | | | | | High | BE - WE - Workplace Services | ET Project Budget | Lights On | Michelle Sa | | 9/10/14 | Workforce Enablement | 180000 | |
|
| PR04823 | FY16 Citrix Upgrade Design | 4/4/16 | 11/4/16 | Approved | Completed | | | | | | | $27,600 | | $79,950 | | | | | | | | High | BE - WE - Workplace Services | ET Project Budget | Lights On | Michelle Sa | | 11/10/15 | Workforce Enablement | | |
|
| PR05180 | Skype for Business Implementation | 10/1/18 | 9/30/19 | Unapproved | Not Started | | | | | | | | | | | | | $225,000 | | | | Medium | BE - WE - Workplace Services | ET Project Budget | New Capabilities | Michelle Sa | | 5/9/16 | Workforce Enablement | | |
|
| PR05820 | FY17 NH - Security Acceleration Program Mgmt. | 12/1/16 | 8/24/17 | Approved | Completed | | | | | | | | | $343,343 | | | | | | | | High | BE - WE - Workplace Services | ET Project Budget | Foundational Improvement | Michelle Sa | | 2/24/17 | Security | | |
|
| PR05173 | FY17 VTC Refresh | 10/10/16 | 9/29/17 | Unapproved | Not Started | | | | | | | | | $400,000 | $3,600,000 | | | | | | | High | BE - WE - Workplace Services | Direct Billed | Lights On | Michelle Sa | | 5/9/16 | Other | | |
|
| PR03314 | Paid Time Off 2015 Policy Change | 5/21/14 | 1/30/15 | Approved | Completed | | | | | $44,445 | | | | | | | | | | | | | EBS - Shared Services | Direct Billed | | Eric S | | 5/21/14 | Other | | |
|
| PR04319 | Personalization - Enterprise Data Governance FY16 | 10/1/15 | 6/8/16 | Approved | Completed | | | | | | | $346,900 | | | | | | | | | | High | EAS - Personalization | ET Project Budget | New Capabilities | Leala | | 5/8/15 | Personalization and Consumer ID | | |
|
| PR04238 | DDM: Business Standards and Compliance | 4/8/15 | 10/1/16 | Approved | Completed | | | | | $44,275 | $151,228 | | | | | | | | | | | | BE - WE - Digital Media Agency (DMA) | Direct Billed | | Ian | | 4/8/15 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05042 | DDM: Corp Hub Replacement | 3/25/16 | 2/8/18 | Approved | Completed | | | | | | | | | $143,465 | $722,109 | $0 | $0 | | | | | | BE - WE - Digital Media Agency (DMA) | Corp Dept Allocated | Foundational Improvement | Ian | | 3/14/16 | Other | | /TWDC Corporate (1032)/HR (1811) |
|
| PR06384 | Cloud Transformation: AWS SIEM Provisioning | 8/11/17 | 11/7/17 | Approved | Completed | | | | | | | | | | $250,000 | | $0 | | | | | High | Security Operations | ET Project Budget | Lights On | Dawn S | | 8/11/17 | Security | | | /Global Information Security/Information Security Operations/Security Operations Center |
| PR06506 | Cloud Transformation: Google/Azure SIEM Provisioning | 10/2/17 | 9/28/18 | Approved | Started | | | | | | | | | | | | $450,000 | | | | | High | Information Security Operations & Remediation Services | ET Project Budget | New Capabilities | Dawn S | | 9/25/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Operations |
| PR04624 | Legal APPG Salesforce extension | 10/1/15 | 9/30/16 | Unapproved | Not Started | | | | | | | $15,000 | | | | | | | | | | | Enterprise Technology | Corp Dept Allocated | | Tim S | | 9/1/15 | Other | | |
|
| PR04623 | Legal TPPR Workflow Automation | 11/22/15 | 2/14/16 | Approved | Completed | | | | | | | $49,000 | | | | | | | | | | | Enterprise Technology | Direct Billed | New Capabilities | Tim S | | 9/1/15 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05265 | ES:Engineering:F4:PAR:2017 Q1-Q2 Cloud & Resiliency | 10/3/16 | 2/23/18 | Approved | Completed | | | | | | | | | $980,000 | | $0 | | | | | | High | EAS - Platform Services | ET Project Budget | New Capabilities | Melinda | | 6/2/16 | Cloud Accelerator | | |
|
| PR01721 | Enterprise Service Management Deployment | 10/7/13 | 2/15/15 | Approved | Started | | | | | $1,977,388 | | | | | | | | | | | | | EIS - Service and Technology Relationship Mgmt | Direct/Organizational Budget | | Rick S | | 10/30/12 | Other | | |
|
| PR05244 | Personalization - Identity Unification & Management FY19 Capex | 10/4/16 | 9/28/18 | Approved | Not Started | | | | | | | | | $0 | | $0 | | | $485,078 | | | High | EAS - Personalization | Direct/Organizational Budget | New Capabilities | Peter S | | 5/26/16 | Personalization and Consumer ID | | |
|
| PR03482 | Backlot Upgrade Project | 1/12/15 | 5/13/16 | Approved | Completed | | | | | $67,078 | | $110,704 | | | | | | | | | | High | BE - WE - Social Business Technology | ET Project Budget | Foundational Improvement | Yoshi | | 7/28/14 | Workforce Enablement | | |
|
| PR04920 | Moana Operational Reporting HANA Sidecar | 6/29/16 | 6/29/18 | Approved | Completed | | | | | | | $98,755 | $1,324,829 | $3,160,470 | $2,211,171 | $2,480,775 | $1,536,000 | | | | | High | EBS - Data | Direct/Organizational Budget | New Capabilities | Michelle T | | 12/1/15 | Enterprise Business Intelligence | | | /Business Applications Services/Finance & Accounting Applications/Accounting Close Applications |
| PR06187 | Application Security remediation | 10/1/17 | 9/1/18 | Unapproved | Not Started | | | | | | | | | | | $100,000 | | | | | | | EBS - Studio | Direct Billed | New Capabilities | Wendy | | 6/15/17 | Other | | |
|
| PR06191 | DISCO Platform refresh/Cloud migration | 10/2/17 | 3/1/18 | Unapproved | Not Started | | | | | | | | | | | $100,000 | | | | | | | EBS - Studio | Direct Billed | Foundational Improvement | Wendy | | 6/15/17 | Cloud Accelerator | | |
|
| PR06197 | Non DISCO migration to cloud | 3/1/18 | 9/1/18 | Unapproved | Not Started | | | | | | | | | | | $100,000 | | | | | | | EBS - Studio | Direct Billed | Foundational Improvement | Wendy | | 6/15/17 | Other | | |
|
| PR06200 | Siebel Replacement | 1/1/18 | 8/1/18 | Unapproved | Not Started | | | | | | | | | | | $50,000 | $150,000 | | | | | | EBS - Studio | Direct Billed | Foundational Improvement | Wendy | | 6/15/17 | Other | | |
|
| PR06217 | non-SAP middelWare migration to the Cloud | 10/1/18 | 9/30/19 | Unapproved | Not Started | | | | | | | | | | | | | $250,000 | | | | Medium | EBS - Shared Services | ET Project Budget | Foundational Improvement | Wendy | | 6/15/17 | Cloud Accelerator | | |
|
| PR06193 | Studio Cognos migration to cloud | 11/1/17 | 9/1/18 | Unapproved | Not Started | | | | | | | | | | | $500,000 | | | | | | Medium | EBS - Studio | Direct Billed | Foundational Improvement | Wendy | | 6/15/17 | Cloud Accelerator | | |
|
| PR06172 | DISCO Archiving | 11/1/17 | 7/1/18 | Unapproved | Not Started | | | | | | | | | | | $70,000 | $440,000 | | | | | | EBS - Studio | Direct Billed | Foundational Improvement | Wendy | | 6/15/17 | Other | | |
|
| PR06171 | TDMS for DISCO QA replication | 3/1/18 | 9/1/18 | Unapproved | Not Started | | | | | | | | | | | $75,000 | $500,000 | | | | | | EBS - Studio | Direct Billed | Foundational Improvement | Wendy | | 6/15/17 | Other | | |
|
| PR06204 | DocView Replacement | 10/1/17 | 7/1/18 | Unapproved | Not Started | | | | | | | | | | | $100,000 | $500,000 | | | | | | EBS - Studio | Direct Billed | Foundational Improvement | Wendy | | 6/15/17 | Other | | |
|
| PR05231 | DDM: WDI Story Box Decommissioning | 5/24/16 | 7/19/17 | Approved | Completed | | | | | | | | | $54,600 | | | | | | | | | BE - WE - Digital Media Agency (DMA) | ET Project Budget | Lights On | Walat | | 5/24/16 | Other | 136983 | /Walt Disney Imagineering-R&D (2089) |
|
| PR06034 | DCPI Forecast & Planning System | 7/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $500,000 | $2,000,000 | | | | | High | EBS - FP&A | Direct Billed | New Capabilities | Andrew W | | 5/25/17 | Automation Acceleration | | |
|
| PR05971 | FY17 OPA Mdrnztin-Inbox NoSQL/Maven Ph 2 | 10/2/16 | 10/3/17 | Approved | Started | | | | | | | | | $0 | $147,616 | | | | | | | | EBS - Licensing | Direct/Organizational Budget | Lights On | Chris Wi | | 5/8/17 | Other | | |
|
| PR05970 | FY17 OPA Mdrnztin-Admin/Struts Repl Ph 1 | 10/2/16 | 10/13/17 | Approved | Started | | | | | | | | | $0 | $196,000 | | | | | | | | EBS - Licensing | Direct/Organizational Budget | Lights On | Chris Wi | | 5/8/17 | Other | | |
|
| PR03984 | FSS TRIRIGA Mobility Discovery | 4/1/14 | 11/30/14 | Approved | Completed | | | | | $10,000 | | | | | | | | | | | | | BE - CE - CRE-Facil-Ctrls | Direct Billed | | Loretta | | 12/9/14 | Other | | |
|
| PR06228 | FY18 TRIRIGA Lease Enhancement | 3/1/18 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $22,000 | | | | | | | BE - CE - CRE-Facil-Ctrls | Direct Billed | New Capabilities | Loretta | | 6/16/17 | Other | | |
|
| PR05390 | Golden Oak Ranch Scheduling Automation | 2/1/18 | 6/1/18 | Unapproved | Not Started | | | | | | | | | | | $22,000 | | | | | | | BE - CE - CRE-Facil-Ctrls | Direct Billed | New Capabilities | Loretta | | 7/5/16 | Other | | |
|
| PR02888 | FSS Time Capture Automation & Payroll Integration Discovery | 11/1/13 | 1/31/15 | Unapproved | Completed | | | | | $25,000 | | | | | | | | | | | | | BE - CE - CRE-Facil-Ctrls | Direct Billed | | Loretta | | 11/14/13 | Other | | |
|
| PR03337 | FSS Self Service Options Discovery (Web) | 6/2/14 | 3/2/15 | Approved | Completed | | | | | $50,000 | | | | | | | | | | | | | BE - CE - CRE-Facil-Ctrls | Direct Billed | | Loretta | | 5/27/14 | Other | | |
|
| PR03338 | FSS TRIRIGA Facilities Assessment & Capital Projects Enhancement bundle | 5/26/14 | 9/30/15 | Approved | Completed | | | | | $50,000 | | | | | | | | | | | | | BE - CE - CRE-Facil-Ctrls | Direct Billed | | Loretta | | 5/27/14 | Other | | |
|
| PR03334 | FSS TRIRIGA Work Order Enhancement Bundle and Data Loading Support | 4/1/14 | 9/30/15 | Approved | Completed | | | | | $50,000 | | | | | | | | | | | | | BE - CE - CRE-Facil-Ctrls | Direct Billed | | Loretta | | 5/27/14 | Other | | |
|
| PR06239 | Golden Oak Ranch Network Upgrades | 10/1/17 | 6/29/18 | Unapproved | Not Started | | | | | | | | | | | $50,000 | | | | | | | BE - CE - CRE-Facil-Ctrls | Direct Billed | Foundational Improvement | Loretta | | 6/19/17 | Other | | |
|
| PR06237 | Parking - NuPark Enhancements | 1/8/18 | 8/31/18 | Unapproved | Not Started | | | | | | | | | | | $50,000 | | | | | | | BE - CE - CRE-Facil-Ctrls | Direct Billed | Foundational Improvement | Loretta | | 6/19/17 | Other | | |
|
| PR06238 | Tableau Reporting for TRIRIGA | 11/1/17 | 3/1/18 | Unapproved | Not Started | | | | | | | | | | | $50,000 | | | | | | | BE - CE - CRE-Facil-Ctrls | Direct Billed | Foundational Improvement | Loretta | | 6/19/17 | Other | | |
|
| PR03966 | FSS Hours-to-Gross Input Grid Enhancement | 10/27/14 | 4/1/15 | Approved | Completed | | | | | $68,400 | | | | | | | | | | | | | BE - CE - CRE-Facil-Ctrls | Direct Billed | | Loretta | | 12/2/14 | Other | | |
|
| PR06236 | MyProfile (IDR) Employee Location Self Service | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $75,000 | | | | | | | BE - CE - CRE-Facil-Ctrls | Direct Billed | New Capabilities | Loretta | | 6/19/17 | Other | | |
|
| PR05388 | FSS TRIRIGA Mobility - Additional Device Roll-out | 6/30/17 | 9/29/17 | Unapproved | Not Started | | | | | | | | | $100,000 | | | | | | | | | BE - CE - CRE-Facil-Ctrls | Direct Billed | New Capabilities | Loretta | | 7/5/16 | Other | | |
|
| PR06168 | DnD TRIRIGA Capital Project Enhancement | 10/15/17 | 6/15/18 | Unapproved | Not Started | | | | | | | | | | | | $100,000 | | | | | | BE - CE - CRE-Facil-Ctrls | Direct Billed | New Capabilities | Loretta | | 6/15/17 | Other | | |
|
| PR06235 | FSS FY18 TRIRIGA Mobility - Enhancements and Additional devices | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $175,000 | | | | | | | BE - CE - CRE-Facil-Ctrls | Direct Billed | New Capabilities | Loretta | | 6/19/17 | Other | | |
|
| PR02893 | FY14 - FY15: FSS TRIRIGA FACP SAP Interfaces for Actuals | 10/1/13 | 10/28/15 | Approved | Completed | | | | | $58,260 | $416,740 | | $0 | | | | | | | | | | BE - CE - CRE-Facil-Ctrls | Direct Billed | | Loretta | | 11/19/13 | Other | | |
|
| PR05389 | FSS TRIRIGA Space Budgeting and Scenario Planning | 1/2/19 | 9/4/19 | Unapproved | Not Started | | | | | | | | | | | | | $150,000 | $350,000 | | | | BE - CE - CRE-Facil-Ctrls | Corp Dept Allocated | New Capabilities | Loretta | | 7/5/16 | Other | | |
|
| PR04095 | FY18: TRIRIGA Self Service Portal Implementation | 11/6/17 | 3/31/19 | Unapproved | Not Started | | | | | | | | | | | | | $150,000 | $350,000 | | | High | BE - CE - CRE-Facil-Ctrls | Corp Dept Allocated | New Capabilities | Loretta | | 2/4/15 | Other | | |
|
| PR02943 | FY17: TRIRIGA Application Upgrade to 10.5.x | 1/30/17 | 9/30/17 | Approved | Started | | | | | | | | | $85,456 | $356,082 | $72,006 | $147,236 | | | | | | BE - CE - CRE-Facil-Ctrls | Corp Dept Allocated | Foundational Improvement | Loretta | | 12/11/13 | Other | | |
|
| PR06775 | FY18: Tririga Lease Accounting and Non-real estate leases | 6/1/18 | 5/31/19 | Unapproved | Not Started | | | | | | | | | | | $64,000 | $252,000 | $128,000 | $504,000 | | | High | BE - CE - CRE-Facil-Ctrls | Corp Dept Allocated | New Capabilities | Loretta | | 2/27/18 | Other | | |
|
| PR06115 | Corp Cost Center Modernization | 10/1/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | | $300,000 | | | | | Medium | EBS - FP&A | Corp Dept Allocated | New Capabilities | Jim W | | 6/5/17 | Automation Acceleration | | /Corporate Segment (1737) | /Business Applications Services/Finance & Accounting Applications/Business Planning & Analysis Applications |
| PR06112 | POC - P&L | 6/5/17 | 12/31/18 | Unapproved | Started | | | | | | | | | | | $200,000 | $500,000 | | | | | Medium | EBS - FP&A | Corp Dept Allocated | New Capabilities | Jim W | | 6/5/17 | Automation Acceleration | | |
|
| PR06113 | ESPN Planning | 10/1/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $200,000 | $1,600,000 | | | | | Medium | EBS - FP&A | Direct Billed | New Capabilities | Jim W | | 6/5/17 | Automation Acceleration | | |
|
| PR04875 | FY16 KPMG MSFT License True-up | 11/16/15 | 4/19/16 | Approved | Completed | | | | | | | $75,000 | | | | | | | | | | | EIS - Program Mgmt and Governance | ET Project Budget | Foundational Improvement | Adrian | Adrian | 11/16/15 | Other | | |
|
| PR05737 | FY17 KPMG MSFT SQL & Windows True-up | 1/4/17 | 6/20/17 | Approved | Completed | | | | | | | | | $90,000 | | | | | | | | Medium | EIS - Program Mgmt and Governance | ET Project Budget | Foundational Improvement | Adrian | Adrian | 1/4/17 | Other | | |
|
| PR05285 | Identity and Access Management Analysis | 9/18/17 | 6/15/18 | Unapproved | Not Started | | | | | | | | | | | $75,000 | | | | | | High | Business Enablement | Direct/Organizational Budget | Foundational Improvement | Suzanne | Paul A | 6/2/16 | Security | | | /Enabling Functions/Technology Business Operations and Strategy/Enterprise Strategy |
| PR06107 | DDM: DDM DTSS Digital Media Agency Technology Stack Enhancements for Reliability | 10/2/17 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $105,000 | $10,000 | | | | | High | BE - WE - Digital Media Agency (DMA) | ET Project Budget | Hard Savings | Kara | Paul A | 6/5/17 | Workforce Enablement | | |
|
| PR06106 | DDM: DDM DTSS Digital Media Agency WordPress Security Center of Excellence | 10/1/17 | 3/31/18 | Unapproved | Not Started | | | | | | | | | | | $20,000 | $180,000 | | | | | High | BE - WE - Digital Media Agency (DMA) | ET Project Budget | Cost Avoidance | Kara | Paul A | 6/5/17 | Workforce Enablement | | |
|
| PR04907 | Demand Automation and User Experience | 11/6/17 | 5/31/18 | Unapproved | Not Started | | | | | | | | | | | | $250,000 | | | | | Low | BE - WE - Social Business Technology | ET Project Budget | Foundational Improvement | Susan R | Paul A | 11/23/15 | Workforce Enablement | | |
|
| PR04917 | FY16 Printer Refresh - Non HP | 3/1/16 | 9/30/16 | Unapproved | Completed | | | | | | | | $407,128 | | | | | | | | | | BE - WE - Workplace Services | Corp Dept Allocated | Foundational Improvement | Scott R | Paul A | 11/30/15 | Other | | |
|
| PR06513 | Data Collaboration Rationalization | 11/13/17 | 12/28/18 | Unapproved | Not Started | | | | | | | | | | | $300,000 | | | | | | Low | BE - WE - Workplace Services | Direct/Organizational Budget | Foundational Improvement | Michelle Sa | Paul A | 10/3/17 | Workforce Enablement | | |
|
| PR06145 | SAP Security Application | 3/1/18 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $200,000 | | | | | | High | EBS - Controllership | ET Project Budget | Security | Sonny | Jon B | 6/8/17 | Security | | |
|
| PR06108 | Robotics Cognitive Computing | 11/20/17 | 6/30/18 | Unapproved | Started | | | | | | | | | | | $500,000 | | | | | | High | EBS - FP&A | ET Project Budget | TWDC Growth Driver | Jon B | Jon B | 6/5/17 | Automation Acceleration | | |
|
| PR05837 | Time & Attendance Management (U.S.)- Media Networks | 10/1/17 | 11/1/18 | Approved | Started | | | | | | | | | | | $1,083,000 | $3,186,000 | $8,000 | $15,000 | | | High | EBS - HCM | ET Project Budget | Hard Savings | Koukeyan, Paul | Jon B | 3/13/17 | Cloud Accelerator | 7256492 | /ABC Corporate (2272) | /Business Applications Services |
| PR06109 | Enterprise Cognos Upgrade: Cognos Version 11 Cognos Version 11 Re-implementation | 3/1/18 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $250,000 | | | | | | High | EBS - FP&A | ET Project Budget | Service Improvement | Brenda | Jon B | 6/5/17 | Cloud Accelerator | | |
|
| PR06111 | Position Cognos to leverage HANA | 7/1/18 | 6/28/19 | Unapproved | Not Started | | | | | | | | | | | $100,000 | $500,000 | | | | | High | EBS - FP&A | ET Project Budget | Hard Savings | Winter | Jon B | 6/5/17 | Tech Optimization Acceleration | | |
|
| PR04964 | Treasury Workstation Discovery | 2/2/16 | 8/31/16 | Approved | Completed | | | | | | | $7,148 | | | | | | | | | | | BE - CE - BTP - Finance | Direct Billed | Foundational Improvement | Dan | Greg Non | 1/14/16 | Other | | /TWDC Corporate (1032)/Treasury (1815) |
|
| PR06320 | Corporate Treasury - EMEA RTC RFP Implementation | 1/1/18 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $125,000 | | | | | | | BE - CE - BTP - Finance | Direct Billed | Foundational Improvement | Nick S | Greg Non | 7/18/17 | Other | | /TWDC Corporate (1032)/Treasury (1815) |
|
| PR06319 | Corporate Treasury - In-House Banking - Initial Pilot | 4/1/18 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $175,000 | | | | | | | BE - CE - BTP - Finance | Direct Billed | Foundational Improvement | Nick S | Greg Non | 7/18/17 | Other | | /TWDC Corporate (1032)/Treasury (1815) |
|
| PR05391 | Corporate Treasury - Cash Management System Implementation | 10/3/16 | 6/30/18 | Unapproved | Not Started | | | | | | | | | | | $258,000 | $450,000 | | | | | | BE - CE - BTP - Finance | Direct Billed | Foundational Improvement | Nick S | Greg Non | 7/5/16 | Other | | /TWDC Corporate (1032)/Treasury (1815) |
|
| PR04030 | Exposure Identification - Implementation | 2/2/16 | 9/30/17 | Approved | Completed | | | | | | | $74,019 | | $39,050 | | | | | | | | | BE - CE - BTP - Finance | Direct Billed | Foundational Improvement | Sujal | Greg Non | 1/8/15 | Other | | /TWDC Corporate (1032)/Treasury (1815) |
|
| PR06640 | Service Portfolio Lifecycle – Service Sunset | 2/5/18 | 9/28/18 | Approved | Started | | | | | | | | | | | $58,810 | | | | | | High | Business Enablement | ET Project Budget | Foundational Improvement | Andrew | Mike Big | 11/28/17 | Portfolio Lyfecycle Accelerator | | |
|
| PR06786 | Telemetry Automation | 2/26/18 | 9/29/18 | Approved | Started | | | | | | | | | | | $200,000 | | | | | | | EAS - Automation Excellence | ET Project Budget | New Capabilities | safia | Brendan | 3/1/18 | Automation Acceleration | | |
|
| PR06089 | Automation: Governance/Excellence | 10/1/17 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $185,000 | $373,000 | | | | | High | EAS - Automation Excellence | ET Project Budget | Cost Avoidance | Veda | Brendan | 5/30/17 | Automation Acceleration | | | /Engineering Services |
| PR06093 | Automation: AI/Machine Learning | 10/1/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $250,000 | $1,000,000 | | | | | High | EAS - Automation Excellence | ET Project Budget | Cost Avoidance | Veda | Brendan | 5/30/17 | Automation Acceleration | | | /Engineering Services |
| PR05083 | Blueprint OneWorld: Replacement (Entity Management) - Discovery | 6/3/17 | 2/5/18 | Approved | Completed | | | | | | | | | $76,000 | | | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | | Alan B | 4/11/16 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR03622 | Outside Counsel Management - Discovery | 10/1/15 | 3/30/16 | Approved | Completed | | | | | | | $55,193 | | | | | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Nina | Alan B | 9/11/14 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06668 | Document Management: Legal Document Management System Replacement | 1/26/18 | 1/26/19 | Approved | Started | | | | | | | | | | | $270,743 | $726,508 | $334,410 | $160,849 | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Barbara B | Alan B | 12/28/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06734 | Blueprint OneWorld: Replacement (Entity Management) - RFP/Eval | 6/1/18 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $40,800 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Matt | Alan B | 2/6/18 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05081 | Legal Training: DM10 / Office 2013 / Acrobat | 8/1/16 | 11/30/16 | Approved | Completed | | | | | | | $7,995 | | $47,765 | | | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Kevin No | Alan B | 4/11/16 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05075 | Rate Warehouse: System Implementation | 5/2/17 | 12/31/18 | Approved | Started | | | | | | | | | $26,000 | | $181,675 | | $17,500 | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Project Manager 2, CE Legal | Alan B | 4/11/16 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05344 | VM: Cloud Portal/Vulnerability Integration | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | | $100,000 | | | | | High | Information Security Assurance Services | ET Project Budget | Foundational Improvement | Allison L | Don | 6/21/16 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Operations |
| PR04493 | VM: Enterprise Vulnerability Management Program Expansion | 2/15/16 | 11/9/17 | Approved | Completed | | | | | | | $0 | | $102,300 | | $0 | | | | | | High | Information Security Assurance Services | ET Project Budget | Foundational Improvement | Allison L | Don | 7/6/15 | Security | | |
|
| PR04501 | VM: Develop Reporting Protocols for the Enterprise VM | 2/15/16 | 9/29/17 | Approved | Completed | | | | | | | $135,000 | | | | | | | | | | High | Information Security Assurance Services | ET Project Budget | Foundational Improvement | Allison L | Don | 7/6/15 | Security | | |
|
| PR06270 | Enterprise Vulnerability Management Program Expansion II | 10/2/17 | 9/28/18 | Approved | Started | | | | | | | | | | | $145,500 | | | | | | High | Information Security Operations & Remediation Services | ET Project Budget | Security | Allison L | Don | 6/22/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Operations |
| PR04064 | Perimeter Security Remediation | 10/1/14 | 9/29/17 | Approved | Completed | | | | | $25,375 | | $127,978 | | $53,695 | | | | | | | | High | Information Security Assurance Services | ET Project Budget | New Capabilities | Allison L | Don | 1/26/15 | Security | | |
|
| PR05342 | VM: Service Now VM Integration and High Impact Inventory | 2/1/17 | 9/29/18 | Approved | Started | | | | | | | | | $182,526 | $65,663 | | $243,147 | | | | | High | Information Security Assurance Services | ET Project Budget | Security | Allison L | Don | 6/21/16 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Operations |
| PR05353 | IAM: Strong Authentication / Step Up Authentication | 10/2/17 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $150,000 | | | | | | High | Identity & Access Management (IAM) | ET Project Budget | Security | Mark N | Don | 6/21/16 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Identity and Access Management |
| PR06266 | Build Certificate Lifecycle Management Program | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $175,000 | | | | | | High | Identity & Access Management (IAM) | ET Project Budget | Security | Mark N | Don | 6/22/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Identity and Access Management |
| PR06277 | Build Key Lifecycle Management Program | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $50,000 | $150,000 | | | | | High | Identity & Access Management (IAM) | ET Project Budget | Security | Mark N | Don | 6/22/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Identity and Access Management |
| PR05352 | IAM: Identity Proofing and Assurance | 8/1/17 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $250,000 | | | | | | High | Identity & Access Management (IAM) | ET Project Budget | Security | Mark N | Don | 6/21/16 | Security | | | /Global Information Security/Identity and Access Management |
| PR05350 | IAM: MyID Roadmap Enhancements | 3/1/17 | 2/28/18 | Approved | Completed | | | | | | | | | $207,400 | $200,000 | $12,600 | $0 | | | | | High | Identity & Access Management (IAM) | ET Project Budget | Security | Mark N | Don | 6/21/16 | Security | | | /Global Information Security/Identity and Access Management |
| PR05977 | IAM: SecureIT Roadmap Initiatives | 10/1/17 | 9/28/18 | Approved | Started | | | | | | | | | | | $15,000 | $463,170 | | | | | High | Identity & Access Management (IAM) | ET Project Budget | Security | Mark N | Don | 5/10/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Identity and Access Management |
| PR05355 | IAM: SecureIT Two Factor PCI Enrollment | 1/3/17 | 2/28/18 | Approved | Completed | | | | | | | | | $321,100 | $350,000 | $33,900 | | | | | | High | Identity & Access Management (IAM) | ET Project Budget | Security | Mark N | Don | 6/21/16 | Security | | | /Global Information Security/Identity and Access Management |
| PR06256 | Sec Ops SOC Expansion - Detective Controls Lab | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $26,000 | | | | | | High | Information Security Operations & Remediation Services | ET Project Budget | Security | Dawn S | Don | 6/22/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Operations |
| PR06264 | Sec Ops SOC Expansion - QRadar Manager of Manager Console | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $51,000 | | | | | | | Information Security Operations & Remediation Services | ET Project Budget | Security | Dawn S | Don | 6/22/17 | Security | | /DTSS Global Information Security (1347) |
|
| PR06257 | QRadar Capabilities Enhancement | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $75,000 | | | | | | High | Information Security Operations & Remediation Services | ET Project Budget | Security | Dawn S | Don | 6/22/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Operations |
| PR06682 | Data Loss Prevention Program: DCL Hardware | 1/11/18 | 9/28/18 | Unapproved | Started | | | | | | | | | | | $7,190 | $129,558 | | | | | High | Information Security Operations & Remediation Services | ET Project Budget | Security | Dawn S | Don | 1/11/18 | Other | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Operations |
| PR06265 | Tanium Governance Model Buildout | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $140,000 | | | | | | | Information Security Operations & Remediation Services | ET Project Budget | Security | Dawn S | Don | 6/22/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Operations |
| PR06607 | Network: Tanium Cloud Deployment | 10/2/17 | 9/28/18 | Approved | Started | | | | | | | | | | | $160,000 | | | | | | High | Information Security Operations & Remediation Services | ET Project Budget | Security | Dawn S | Don | 11/3/17 | Other | | | /Global Information Security/Information Security Operations |
| PR06259 | DCL SIEM Refresh | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $28,000 | $195,000 | | | | | High | Information Security Operations & Remediation Services | ET Project Budget | Security | Dawn S | Don | 6/22/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Operations |
| PR06260 | Sec Ops Cloud Tools, Integration & Test Environment Deployment | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $255,000 | | | | | | High | Information Security Operations & Remediation Services | ET Project Budget | Security | Dawn S | Don | 6/22/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Operations |
| PR06254 | Network: FY18 RSA FPC Phase III | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $279,788 | $199,992 | | | | | High | Information Security Operations & Remediation Services | ET Project Budget | Security | Dawn S | Don | 6/22/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Operations |
| PR06263 | Sec Ops SOC Expansion - Application Logging | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $67,000 | $493,000 | | | | | High | Information Security Operations & Remediation Services | ET Project Budget | Security | Dawn S | Don | 6/22/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Operations |
| PR05347 | SecOps: Implement Full Packet Data Capture for Network Security Monitoring 2017 | 10/3/16 | 9/28/18 | Approved | Started | | | | | | | | | $336,964 | $810,371 | $60,000 | $0 | | | | | High | Information Security Operations & Remediation Services | ET Project Budget | Security | Connie | Don | 6/21/16 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Operations |
| PR06344 | FIRE: Bad Email Monitoring Enhancements and Automation | 7/25/17 | 9/28/18 | Approved | Started | | | | | | | | | $10,417 | | $143,232 | | | | | | High | Information Security Monitoring, Incident Response & Investigation Support | ET Project Budget | Security | Felana | Don | 7/25/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Monitoring, Incident Response & Investigation Support |
| PR04031 | Global Credit Scoring & Analytics | 2/23/15 | 8/3/17 | Approved | Started | | | | | $83,760 | $0 | $197,884 | $88,433 | $100,200 | $64,440 | | | | | | | | BE - CE - BTP - Finance | Corp Dept Allocated | New Capabilities | Anna | Kathy | 1/8/15 | Other | 5028600 | /TWDC Corporate (1032)/Credit and Collections (1976) |
|
| PR04916 | Legal Intranet | 2/1/16 | 4/14/17 | Approved | Completed | | | | | | | $97,232 | $324,429 | $0 | $0 | | | | | | | | BE- CE - BTP - Legal | Direct Billed | New Capabilities | Barbara B | Tania | 11/27/15 | Other | | /TWDC Corporate (1032)/Legal (1805) | /Business Applications Services |
| PR06357 | Law Firm Security Reviews: FY18 (Part 2) | 5/28/18 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $151,556 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Kevin No | Tania | 8/2/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06073 | Law Firm Security Reviews: FY18 (Part 1) | 10/2/17 | 5/25/18 | Approved | Started | | | | | | | | | | | $267,565 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Kevin No | Tania | 5/29/17 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR05129 | Law Firm Security Reviews - Part 1 (FY17) | 7/11/16 | 2/22/18 | Approved | Completed | | | | | | | $53,330 | | $309,611 | | $0 | | | | | | | BE- CE - BTP - Legal | Direct Billed | Foundational Improvement | Kevin No | Tania | 4/12/16 | Other | | /TWDC Corporate (1032)/Legal (1805) |
|
| PR06271 | Enterprise Data Classification File Solution | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $100,000 | | | | | | High | Information Security Architecture & Engineering | ET Project Budget | Security | Julie | Julie | 6/22/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Architecture & Engineering |
| PR05358 | GIS: Consulting: Cloud Transformation | 3/24/17 | 3/23/18 | Approved | Completed | | | | | | | | | $176,138 | | $0 | | | | | | High | Enterprise Architecture & Global Information Security & Technology Risk Mgmt | ET Project Budget | Foundational Improvement | Julie | Julie | 6/21/16 | Security | | | /Global Information Security |
| PR06261 | Extend Security Controls to IaaS and PaaS | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $200,000 | | | | | | | Information Security Architecture & Engineering | ET Project Budget | Security | Julie | Julie | 6/22/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Architecture & Engineering |
| PR05348 | Data Protection: DLP - Cloud Scanning | 2/1/17 | 3/26/18 | Approved | Started | | | | | | | | | $332,000 | | | | | | | | High | Enterprise Architecture & Global Information Security & Technology Risk Mgmt | ET Project Budget | New Capabilities | Julie | Julie | 6/21/16 | Security | | | /Global Information Security |
| PR06268 | Enterprise File Encryption Solution | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $400,000 | $450,000 | | | | | High | Information Security Architecture & Engineering | ET Project Budget | Security | Julie | Julie | 6/22/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Architecture & Engineering |
| PR06269 | EA: Resiliency in the Cloud | 2/1/18 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $130,000 | | | | | | High | Enterprise Architecture | ET Project Budget | Security | Noella | Matt | 6/22/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security |
| PR06284 | ECP Demand Management - Project Services | 4/1/18 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $78,000 | | | | | | Medium | EBS - Treasury - ECP | ET Project Budget | Service Improvement | Dunn, Jason | Nancy | 6/27/17 | Corporate Customer Driven | | |
|
| PR05994 | Enterprise Data Platform Architecture FY17-18 | 5/22/17 | 4/1/18 | Approved | Started | | | | | | | | | | | $307,704 | | | | | | High | EBS - Data | ET Project Budget | Service Improvement | Allison | Nancy | 5/16/17 | Strategic Data Accelerator | | |
|
| PR06144 | Statutory and Regulatory Mandated Changes | 3/1/18 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $85,000 | | | | | | High | EBS - HCM | ET Project Budget | Security | Paul K | Nancy | 6/8/17 | Compliance | | |
|
| PR06141 | DLP SAP Implementation | 3/1/18 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $180,000 | | | | | | High | EBS - HCM | ET Project Budget | Service Improvement | Koukeyan, Paul | Nancy | 6/8/17 | Workforce Enablement | | |
|
| PR06137 | Core HR & Payroll Discovery Project | 4/1/18 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $750,000 | | | | | | High | EBS - HCM | ET Project Budget | Service Improvement | Koukeyan, Paul | Nancy | 6/8/17 | Workforce Enablement | | |
|
| PR06285 | EBS Professional Services | 10/1/17 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $200,000 | | | | | | Medium | EBS - Shared Services | ET Project Budget | Service Improvement | Rebecca | Nancy | 6/27/17 | Other | | |
|
| PR03115 | ES: CMS: GoPublish: PS: ABC Digital Media Editorial Tools | 3/6/14 | 5/23/17 | Approved | Started | | | | | $250,000 | | $220,000 | | | | | | | | | | | EAS - Content Management Systems | Direct Billed | Foundational Improvement | Anthony v | Robert Non | 3/12/14 | Other | | /ABC Digital Media Product and Design (1002) | /Engineering Services/Content Management |
| PR03477 | Corporate Tax - LCR Dixon Upgrade and Maintenance | 1/5/15 | 9/30/15 | Approved | Completed | | | | | $74,000 | | | | | | | | | | | | High | BE - CE - BTP - Finance | Direct Billed | | Nick S | Erik | 7/28/14 | Corporate Customer Driven | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR06678 | APS: DMM Upgrade and Migration | 2/11/18 | 8/18/18 | Unapproved | Not Started | | | | | | | | | | | | $125,000 | | | | | Medium | BE - WE - APS | ET Project Budget | Foundational Improvement | Kara | kara | 1/8/18 | Other | | |
|
| PR06718 | APS: Enterprise Video - Magic in Motion Replacement | 1/28/18 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $226,088 | | | | | | High | BE - WE - APS | ET Project Budget | Foundational Improvement | Kara | kara | 1/29/18 | Other | | |
|
| PR04804 | eSignature Project | 6/20/16 | 9/30/18 | Approved | Started | | | | | | | $32,062 | $15,360 | $593,703 | $154,682 | $299,642 | $2,375 | | | | | High | BE - WE - APS | ET Project Budget | Hard Savings | Cynthia | kara | 11/3/15 | Workforce Enablement | 7250000 | | /Workforce Technology/Enterprise Content Management/Electronic Signature |
| PR06383 | Consumer MDM FY18-19 | 10/1/17 | 9/27/19 | Unapproved | Not Started | | | | | | | | | | | $500,000 | $1,850,000 | $600,000 | $540,000 | | | Medium | EAS – Consumer Identity & Data | ET Project Budget | Security | Scott C | Joel | 8/10/17 | Strategic Data Accelerator | | |
|
| PR06313 | Athena Cloud Migration | 2/1/18 | 8/30/18 | Unapproved | Not Started | | | | | | | | | | | $555,000 | $1,463,500 | | | | | High | EAS – Consumer Identity & Data | ET Project Budget | Service Risk | Peter | Joel | 7/14/17 | Strategic Data Accelerator | | | /Enterprise Data Solutions and Services/Consumer Data Solutions/Data Solutions & Analytics |
| PR06541 | EDP Cloud Migration | 10/1/17 | 9/30/18 | Unapproved | Started | | | | | | | | | | | $700,000 | $900,000 | | | | | High | EAS – Consumer Identity & Data | ET Project Budget | Service Improvement | Renat | Joel | 10/10/17 | Strategic Data Accelerator | | | /Enterprise Data Solutions and Services/Data & Data Platform Management Services/EDP (Enterprise Data Platform) Services |
| PR04790 | Personalization - Permissions Center MVP | 7/4/16 | 3/31/18 | Approved | Started | | | | | | | | | $480,000 | $2,470,000 | $205,000 | $3,000,000 | | | | | High | EAS - Personalization | ET Project Budget | Security | McManus | Joel | 11/3/15 | Personalization and Consumer ID | | |
|
| PR06672 | ES: IDENTITY: OneID: ESPN BAMTech Direct to Consumer Support | 10/1/17 | 7/1/18 | Approved | Not Started | | | | | | | | | | | $336,000 | $640,000 | | | | | High | EAS - Identity and Commerce Systems | ET Project Budget | Service Improvement | Alex | Joel | 1/3/18 | Other | | |
|
| PR06094 | ES: IDENTITY: One ID Cloud Acceleration | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $3,400,000 | | | | | | High | EAS - Identity and Commerce Systems | ET Project Budget | Service Improvement | Alex | Joel | 5/30/17 | Other | | | /Engineering Services/Identity and Access Management |
| PR06095 | ES: PAR: Launchpad Enterprise Technology Discovery | 4/2/18 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $300,000 | | | | | | High | EAS - Identity and Commerce Systems | ET Project Budget | Cost Avoidance | Liraz | Joel | 5/30/17 | Other | | | /Engineering Services |
| PR06092 | ES: PAR: Launchpad Enterprise Technology Implementation | 10/1/18 | 5/31/19 | Unapproved | Not Started | | | | | | | | | | | | | $400,000 | $1,300,000 | | | High | EAS - Identity and Commerce Systems | ET Project Budget | Service Improvement | Liraz | Joel | 5/30/17 | Other | | | /Engineering Services |
| PR06134 | FY18 Refresh BNDS | 10/2/17 | 9/28/18 | Approved | Started | | | | | | | | | | | $222,390 | | | | | | | EIS - Ops & Service Delivery | ET Project Budget | Service Risk | Kelly | Terroli | 6/7/17 | Other | | |
|
| PR06614 | CTaM | 1/1/18 | 9/30/18 | Approved | Not Started | | | | | | | | | | | $208,800 | | | | | | | EBS - Data | ET Project Budget | Service Improvement | Sapna | John K | 11/8/17 | Other | | |
|
| PR06838 | CTaM Genome Bolt Integration | 4/1/18 | 6/30/19 | Unapproved | Not Started | | | | | | | | | | | $186,000 | | $125,000 | | | | High | EBS - Data | ET Project Budget | Service Improvement | Sapna | John K | 3/23/18 | Strategic Data Accelerator | | |
|
| PR05879 | CTaM ATG Integration | 7/3/17 | 3/30/18 | Approved | Not Started | | | | | | | | | | | $95,000 | $473,572 | | | | | High | EBS - Data | ET Project Budget | Service Improvement | Sapna | John K | 3/31/17 | Strategic Data Accelerator | | |
|
| PR06741 | BPAC Migration to Torch Platform | 4/1/18 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $100,000 | $400,000 | | | | | | EBS - Data | ET Project Budget | New Capabilities | John K | John K | 2/7/18 | Other | | | /Enterprise Data Solutions and Services |
| PR06327 | Torch Platform Decommission (Related to: PID: PR04920) | 4/1/18 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $900,000 | $900,000 | | | | | High | EBS - Data | ET Project Budget | Hard Savings | John K | John K | 7/19/17 | Strategic Data Accelerator | | |
|
| PR06312 | Data Sharing (Pub/Sub) - FY18 - Discovery UI | 4/1/18 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $324,000 | $405,000 | | | | | High | EBS - Data | ET Project Budget | Security | Joe K | John K | 7/14/17 | Strategic Data Accelerator | | |
|
| PR05241 | Data Sharing (Pub/Sub) - FY17 & 18 | 2/13/17 | 9/30/18 | Approved | Started | | | | | | | | | $216,000 | $90,615 | $72,000 | $799,992 | | | | | High | EBS - Data | ET Project Budget | Service Improvement | Joe K | John K | 5/26/16 | Strategic Data Accelerator | | |
|
| PR06340 | Succession Planning - Solution Evolution & Modeling Tool | 9/26/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $200,000 | $300,000 | | | | | | BE - CE - Human Resources | ET Project Budget | New Capabilities | Shawn | Chris K | 7/21/17 | Other | | /TWDC Corporate (1032)/HR (1811) | /Business Applications Services/HR Applications |
| PR06769 | O365 Mail Interim Security Monitoring | 2/26/18 | 6/15/18 | Approved | Not Started | | | | | | | | | | | $171,000 | | | | | | High | Business Enablement | ET Project Budget | Lights On | Andrew | Chris La | 2/23/18 | Security | | |
|
| PR05284 | Active User Licensing: Data/Reporting Pilot | 7/3/17 | 1/4/18 | Approved | Started | | | | | | | | | $100,000 | | $0 | | | | | | High | Business Enablement | Direct/Organizational Budget | Foundational Improvement | Holly | Chris La | 6/2/16 | Strategic Data Accelerator | | |
|
| PR05380 | Enterprise Digital Asset Search - PAR #5 - Creative Asset Search Continuation | 7/15/16 | 12/31/16 | Approved | Completed | | | | | | | $50,000 | | | | | | | | | | High | Business Enablement | ET Project Budget | New Capabilities | vipul | Chris La | 6/27/16 | Strategy-Innovation-R&D | | /TWDC Corporate (1032) |
|
| PR04990 | Enterprise Digital Asset Search – Par #4 of 4 - Nemo Beta Build | 3/1/16 | 10/19/16 | Approved | Completed | | | | | | | $165,640 | | $0 | | | | | | | | High | Business Enablement | ET Project Budget | New Capabilities | vipul | Chris La | 2/8/16 | Strategy-Innovation-R&D | | |
|
| PR04275 | Finding Nemo - Digital Asset Management Search - Phase 2 | 10/5/15 | 2/3/17 | Approved | Completed | | | | | | | $192,000 | | $0 | | | | | | | | High | Business Enablement | ET Project Budget | New Capabilities | vipul | Chris La | 5/5/15 | Strategy-Innovation-R&D | | |
|
| PR04563 | Enterprise Digital Asset Search – Nemo Alpha Builds | 8/7/15 | 6/23/17 | Approved | Completed | | | | | $55,120 | | $190,920 | $0 | | | | | | | | | High | Business Enablement | ET Project Budget | New Capabilities | vipul | Chris La | 8/7/15 | Strategy-Innovation-R&D | | | /Business Applications Services |
| PR06120 | FY18 KPMG MSFT SQL & Windows True-up | 1/4/18 | 4/28/18 | Approved | Started | | | | | | | | | | | $210,000 | | | | | | Medium | EIS - Program Mgmt and Governance | ET Project Budget | Hard Savings | Adrian | Andy | 6/6/17 | Other | | |
|
| PR05270 | ES:Engineering:Security:PAR:Secure-SDLC | 10/3/16 | 4/15/18 | Approved | Started | | | | | | | | | $364,000 | | $386,000 | | | | | | High | EAS - Engineering | ET Project Budget | Security | CJ | Eric L | 6/2/16 | Security | | |
|
| PR06478 | ES: OneID - Marvel Onboarding | 9/8/17 | 12/31/17 | Approved | Completed | | | | | | | | | | | $20,000 | | | | | | High | EAS - Engineering | ET Project Budget | New Capabilities | Irene | Eric L | 9/8/17 | Personalization and Consumer ID | | /Marvel (1819) |
|
| PR06617 | Release Management Automation (Plutora) | 4/1/18 | 9/30/18 | Unapproved | Started | | | | | | | | | | | $115,000 | $127,000 | | | | | | Enterprise Application Services | ET Project Budget | Cost Avoidance | Angie | Eric L | 11/13/17 | Automation Acceleration | | | /Engineering Services |
| PR03599 | ES: IDENTITY: Disney ID: PAR: Groups & Subaccounts | 9/1/14 | 10/12/15 | Approved | Completed | | | | | $176,000 | $990,000 | | | | | | | | | | | | EAS - Identity and Commerce Systems | Direct/Organizational Budget | | Joel | Eric L | 9/4/14 | Disney ID | | |
|
| PR03961 | ES: IDENTITY: PAR: Launchpad | 11/24/14 | 7/29/16 | Approved | Completed | | | | | $382,775 | $1,298,174 | | $863,878 | | | | | | | | | | EAS - Identity and Commerce Systems | Direct/Organizational Budget | New Capabilities | Joel | Eric L | 12/1/14 | Disney ID | | | /Engineering Services/Guest Identity Services |
| PR06091 | ES: Engineering:F4:PAR:2018 Q3-Q4 Cloud & Resiliency | 4/2/18 | 12/31/18 | Unapproved | Not Started | | | | | | | | | | | $490,000 | | $490,000 | | | | High | EAS - Engineering | ET Project Budget | Service Improvement | Eric | Eric L | 5/30/17 | Cloud Accelerator | | | /Engineering Services |
| PR04309 | Personalization - Permissions Center Solutioning Oct-Mar FY16 | 10/1/15 | 10/1/16 | Approved | Completed | | | | | | | $600,000 | | | | | | | | | | High | EAS - Personalization | ET Project Budget | New Capabilities | McManus | Eric L | 5/8/15 | Personalization and Consumer ID | | |
|
| PR04801 | ES: ARCH: Security: PAR: Secure SDLC | 10/1/17 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $200,000 | | | | | | High | EAS - Messaging Systems | ET Project Budget | Security | Melinda | Eric L | 11/3/15 | Security | | |
|
| PR05747 | ES:Engineering:F4:PAR:2017 Q3-Q4 Cloud & Resiliency | 6/1/17 | 1/31/18 | Approved | Started | | | | | | | | | $0 | | $980,000 | | | | | | High | EAS - Engineering | ET Project Budget | Service Improvement | Melinda | Eric L | 1/11/17 | Cloud Accelerator | | | /Engineering Services |
| PR06099 | ES: Engineering:F4:PAR:2018 Q1-Q2 Cloud & Resiliency | 10/3/17 | 6/30/18 | Approved | Not Started | | | | | | | | | | | $980,000 | | | | | | High | EAS - Engineering | ET Project Budget | Service Improvement | Melinda | Eric L | 5/31/17 | Cloud Accelerator | | | /Engineering Services |
| PR04658 | ES: F4: PAR: Phase 3 - FY16 Active/Active, Resiliency across Tier 1 services | 10/5/15 | 12/19/16 | Approved | Completed | | | | | | | $1,840,000 | | | | | | | | | | High | EAS - Engineering | ET Project Budget | Foundational Improvement | Melinda | Eric L | 9/28/15 | Continuous Availability | | /TWDC Corporate (1032)/Shared Services (1982) | /Engineering Services/Guest Identity Services |
| PR05268 | ES: FND: KMS: PAR: KMaaS Onboarding | 11/1/16 | 1/31/18 | Approved | Completed | | | | | | | | | $65,000 | | $45,000 | | | | | | High | EAS - Foundational Technologies | ET Project Budget | Security | Cameron | Eric L | 6/2/16 | Security | | |
|
| PR06151 | ES: FND: MyID: PAR: Enhanced Helpdesk Tools | 7/1/17 | 9/28/18 | Approved | Started | | | | | | | | | $20,000 | | $180,000 | | | | | | High | EAS - Foundational Technologies | ET Project Budget | New Capabilities | Cameron | Eric L | 6/12/17 | Workforce Enablement | | | /Engineering Services |
| PR05432 | ES: FND: Webvan: PAR: Cloud-enable Webvan | 1/1/18 | 4/30/18 | Unapproved | Not Started | | | | | | | | | | | $210,000 | | | | | | High | EAS - Foundational Technologies | ET Project Budget | Service Risk | Cameron | Eric L | 7/14/16 | Cloud Accelerator | | |
|
| PR06837 | ES: FND: Keystone: PAR :Enhanced Resiliency | 2/1/18 | 9/28/18 | Unapproved | Started | | | | | | | | | | | $360,000 | | | | | | | EAS - Foundational Technologies | ET Project Budget | N/A | Cameron | Eric L | 3/23/18 | Security | | | /Engineering Services/Identity and Access Management/Authorization Services/Keystone |
| PR05274 | ES: FND: AuthZ: PAR: AuthZ Self-Service and Security Lifecycle Management | 7/1/17 | 2/20/18 | Approved | Started | | | | | | | | | $93,333 | $93,333 | $186,666 | $186,666 | | | | | High | EAS - Foundational Technologies | ET Project Budget | Security | Cameron | Eric L | 6/2/16 | Security | | |
|
| PR06096 | ES: FND: MyID: Foundational Improvements - FY18 | 10/1/17 | 9/28/18 | Approved | Started | | | | | | | | | | | $760,000 | $1,160,000 | | | | | High | EAS - Foundational Technologies | ET Project Budget | Security | Cameron | Eric L | 5/30/17 | Other | | |
|
| PR05695 | Enterprise Digital Asset Search - PAR 7 | 12/1/16 | 3/23/17 | Approved | Completed | | | | | | | | | $40,000 | | | | | | | | High | Business Enablement | ET Project Budget | New Capabilities | vipul | Duke | 11/22/16 | Strategy-Innovation-R&D | | /DTSS EAS-Engineering Services (1029) |
|
| PR05829 | Enterprise Digital Asset Search - PAR 9 - April,May 2017 | 3/9/17 | 7/3/17 | Approved | Completed | | | | | | | | | $40,000 | | | | | | | | High | Business Enablement | ET Project Budget | New Capabilities | vipul | Duke | 3/9/17 | Strategy-Innovation-R&D | | /DTSS EAS-Engineering Services (1029) |
|
| PR05282 | Workforce Experience: HR Product Management Support (Workplace by Facebook, etc. | 11/6/17 | 6/29/18 | Unapproved | Not Started | | | | | | | | | | | $150,000 | | | | | | Medium | Business Enablement | ET Project Budget | Service Risk | Brian M | Brian | 6/2/16 | Workforce Enablement | | |
|
| PR07005 | Project 'Ohana | 10/3/16 | 3/19/18 | Approved | Started | | | | | | | | | $0 | $20,000 | | | | | | | Low | Business Enablement | ET Project Budget | New Capabilities | Kase | Susan O | 4/14/17 | Other | | |
|
| PR04909 | HipChat | 11/1/15 | 3/1/16 | Approved | Completed | | | | | | | $52,968 | | $1,656 | | | | | | | | High | EIS - Ops & Service Delivery | ET Project Budget | Lights On | Pam F | Alan B | 11/24/15 | Workforce Enablement | | /Corporate Segment (1737) | /Enterprise Data Solutions and Services |
| PR04336 | Upgrade DCL and IDR webMethods instances | 6/1/15 | 4/25/17 | Approved | Completed | | | | | | $30,000 | $124,828 | $176,500 | $92,414 | $20,000 | | | | | | | | EBS - Shared Services | Direct/Organizational Budget | Foundational Improvement | Art | Joe S | 5/14/15 | Other | 963735 | | /Business Applications Services |
| PR00268 | Ride Matching Replacement Project | 1/7/13 | 9/17/15 | Approved | Completed | | | | | $116,752 | $68,850 | | | | | | | | | | | | BE - CE - Corporate Staff II | Direct Billed | | Sheila | Beth Non | 11/24/10 | Other | | /TWDC Corporate (1032)/Corporate Citizenship (1734) |
|
| PR04997 | Corporate Tax - Project Lionheart | 4/1/16 | 10/31/17 | Approved | Completed | | | | | | | $7,085 | $404,556 | $0 | $239,600 | $0 | | | | | | High | EBS - FP&A | Corp Dept Allocated | Foundational Improvement | Rob B | John Non User | 2/9/16 | Corporate Customer Driven | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR05026 | Corporate Tax - Incremental SharePoint Development | 3/21/16 | 9/11/17 | Approved | Completed | | | | | | | $2,451 | | $0 | | | | | | | | High | BE - CE - BTP - Finance | ET Project Budget | Foundational Improvement | Nick S | John Non User | 3/8/16 | Corporate Customer Driven | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR05394 | Corporate Tax - OneSource Transfer Pricing POC | 12/1/15 | 9/30/16 | Approved | Completed | | | | | | | $9,500 | | | | | | | | | | | BE - CE - BTP - Finance | Direct Billed | Foundational Improvement | Nick S | John Non User | 7/6/16 | Other | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR05399 | Corporate Tax - Website Development | 1/1/17 | 6/30/17 | Unapproved | Not Started | | | | | | | | | $10,000 | | | | | | | | | BE - CE - BTP - Finance | Direct Billed | Foundational Improvement | Nick S | John Non User | 7/6/16 | Other | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR03706 | Corporate Tax - SharePoint Optimization | 6/15/16 | 12/6/16 | Approved | Completed | | | | | | | $8,321 | | $2,178 | | | | | | | | High | BE - CE - BTP - Finance | ET Project Budget | Foundational Improvement | Nick S | John Non User | 9/26/14 | Corporate Customer Driven | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR05059 | Corporate Tax - SharePoint Assessment | 4/11/16 | 9/30/16 | Approved | Completed | | | | | | | $10,872 | | | | | | | | | | High | BE - CE - BTP - Finance | ET Project Budget | Foundational Improvement | Nick S | John Non User | 3/30/16 | Corporate Customer Driven | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR05205 | Corporate Tax - Transfer Pricing SharePoint site | 4/18/16 | 7/31/16 | Approved | Completed | | | | | | | $11,050 | | | | | | | | | | | BE - CE - BTP - Finance | Direct Billed | Foundational Improvement | Nick S | John Non User | 5/16/16 | Other | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR04646 | Corporate Tax - SAP to TaxDriver Automated Data Feed | 9/17/15 | 12/23/16 | Approved | Completed | | | | | | | $14,015 | | $0 | | | | | | | | High | Business Enablement | ET Project Budget | Foundational Improvement | Nick S | John Non User | 9/17/15 | Corporate Customer Driven | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR06317 | Corporate Tax - Artificial Intelligence support for Tax Analysis | 7/1/18 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $25,000 | | | | | | | BE - CE - BTP - Finance | Direct Billed | Foundational Improvement | Nick S | John Non User | 7/18/17 | Other | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR05062 | Corporate Tax - OLAF for Income and Property Tax | 6/1/16 | 12/31/16 | Approved | Completed | | | | | | | $35,000 | | | | | | | | | | High | BE - CE - BTP - Finance | Direct Billed | Foundational Improvement | Nick S | John Non User | 3/30/16 | Corporate Customer Driven | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR05396 | Corporate Tax - Workfront Incremental Development FY18 | 1/2/17 | 3/31/18 | Unapproved | Not Started | | | | | | | | | $0 | | $35,000 | | | | | | | BE - CE - BTP - Finance | Direct Billed | Foundational Improvement | Nick S | John Non User | 7/6/16 | Other | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR03328 | Corporate Tax - Sales and Use Tax Audit Tools - Diagnostax and flexRFC | 6/1/15 | 6/30/17 | Unapproved | Not Started | | | | | | | | | $45,000 | | | | | | | | Medium | BE - CE - BTP - Finance | Direct Billed | New Capabilities | Nick S | John Non User | 5/23/14 | Corporate Customer Driven | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR05395 | Corporate Tax - SharePoint Incremental Development FY18 | 1/2/17 | 3/31/18 | Unapproved | Not Started | | | | | | | | | $0 | | $50,000 | | | | | | | BE - CE - BTP - Finance | Direct Billed | Foundational Improvement | Nick S | John Non User | 7/6/16 | Other | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR05397 | Corporate Tax - Tax Compliance System Modernization Part I | 1/1/17 | 6/30/17 | Unapproved | Not Started | | | | | | | | | $50,000 | | | | | | | | | BE - CE - BTP - Finance | Direct Billed | Foundational Improvement | Nick S | John Non User | 7/6/16 | Other | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR06318 | Corporate Tax - Federal Tax Reform (Film Amortization) | 4/1/18 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $50,000 | | | | | | | BE - CE - BTP - Finance | Direct Billed | Lights On | Nick S | John Non User | 7/18/17 | Other | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR03325 | Corporate Tax - Enhanced Forecasting Model Phase 1 | 8/1/14 | 4/30/15 | Approved | Completed | | | | | $70,000 | | | | | | | | | | | | | BE - CE - BTP - Finance | Direct Billed | | Nick S | John Non User | 5/23/14 | Other | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR06316 | Corporate Tax - Tax Data Mapping and Management | 10/1/17 | 3/31/18 | Unapproved | Not Started | | | | | | | | | | | $75,000 | | | | | | | BE - CE - BTP - Finance | Direct Billed | Foundational Improvement | Nick S | John Non User | 7/18/17 | Other | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR03496 | Corporate Tax - Expat Security Remediation / Cryptzone Implementation | 10/1/14 | 11/10/16 | Approved | Completed | | | | | $92,807 | | $0 | | $0 | | | | | | | | High | BE - CE - BTP - Finance | ET Project Budget | New Capabilities | Nick S | John Non User | 8/1/14 | Corporate Customer Driven | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR05293 | Corporate Tax - Legal Entity Management System | 8/1/16 | 3/31/18 | Unapproved | Not Started | | | | | | | $0 | | $0 | | $100,000 | | | | | | High | BE - CE - BTP - Finance | Direct Billed | New Capabilities | Nick S | John Non User | 6/6/16 | Other | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR05398 | Corporate Tax - Tax Compliance System Modernization Part II | 7/1/17 | 12/31/17 | Unapproved | Not Started | | | | | | | | | $100,000 | | $50,000 | | | | | | | BE - CE - BTP - Finance | Direct Billed | Foundational Improvement | Nick S | John Non User | 7/6/16 | Other | | /TWDC Corporate (1032)/Tax (1809) |
|
| PR06390 | Migrate Customer Care (Kana/Salesforce) to Zendesk | 9/4/17 | 8/15/18 | Approved | Started | | | | | | | | | $86,700 | | $954,900 | | | | | | High | Business Enablement | Corp Dept Allocated | Foundational Improvement | David G | Yoshi | 8/16/17 | Portfolio Lyfecycle Accelerator | | | /Enabling Functions |
| PR05250 | ServiceNow Catalog Improvements | 1/15/18 | 8/31/18 | Unapproved | Started | | | | | | | | | | | $250,000 | | | | | | High | BE - WE - Social Business Technology | ET Project Budget | Service Risk | Susan R | Yoshi | 5/26/16 | Strategy-Innovation-R&D | | |
|
| PR05283 | ServiceNow Scoped Application Transformation | 10/1/17 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $900,000 | $100,000 | | | | | Medium | BE - WE - Social Business Technology | ET Project Budget | Service Risk | Susan R | Yoshi | 6/2/16 | Strategic Data Accelerator | | | /Enabling Functions/Technology Business Operations and Strategy/Enterprise Strategy |
| PR06604 | GRC: Migrate ServiceNow GRC to 'Scoped Application' | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $50,000 | | | | | | High | Compliance | ET Project Budget | Security | Moira | Glen | 11/3/17 | Other | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Governance, Risk Management & Compliance/Compliance |
| PR06605 | GRC: ServiceNow IT GRC Control Framework & Audit Assessment Capability | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $25,000 | $165,000 | | | | | High | Information Security Governance, Risk Management & Compliance | ET Project Budget | Security | Moira | Glen | 11/3/17 | Other | | | /Global Information Security/Information Security Governance, Risk Management & Compliance |
| PR05343 | AppSec: Hi Impact Application Enumeration | 3/24/17 | 9/28/18 | Approved | Started | | | | | | | | | $0 | | $136,100 | | | | | | High | Information Security Assurance Services | ET Project Budget | Security | Brian D | Glen | 6/21/16 | Security | | | /Global Information Security/Information Security Assurance Services |
| PR05346 | AppSec: Automated Light Touch Assessment (ALTA) | 3/15/17 | 9/30/18 | Approved | Started | | | | | | | | | $0 | $0 | $489,000 | $0 | | | | | High | Information Security Assurance Services | ET Project Budget | Security | Brian D | Glen | 6/21/16 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Assurance Services |
| PR06255 | Analyze, Prioritize and Drive Remediation of Exploitable Perimeter Vulnerabiliti | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $500,000 | | | | | | High | Information Security Assurance Services | ET Project Budget | Security | Brian D | Glen | 6/22/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Assurance Services |
| PR06504 | AppSec: Onboard and Manage High Priority SDI Applications Through Hypercare | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $420,000 | $400,000 | | | | | High | Information Security Assurance Services | ET Project Budget | Security | Brian D | Glen | 9/21/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Assurance Services |
| PR06833 | GRC Big 5 Assessment Project | 3/20/18 | 9/28/18 | Unapproved | Started | | | | | | | | | | | $119,600 | | | | | | | Information Security Governance, Risk Management & Compliance | ET Project Budget | Security | Christopher | Glen | 3/20/18 | Security | | /DTSS Global Information Security (1347) |
|
| PR05822 | Enterprise Data Asset Inventory PoC | 4/3/17 | 12/30/17 | Approved | Started | | | | | | | | | $0 | | $19,200 | $128,160 | | | | | High | Enterprise Architecture & Global Information Security & Technology Risk Mgmt | ET Project Budget | Security | Nina | Glen | 2/28/17 | Strategic Data Accelerator | | /DTSS Other (1031) |
|
| PR05705 | FY17 - 820 Flower Tech Refresh Phase 1 | 12/31/16 | 10/19/17 | Approved | Completed | | | | | | | | | $2,284 | $29,446 | | $0 | | | | | High | BE - WE - Workplace Services | ET Project Budget | Foundational Improvement | Kevin | Steve T | 12/5/16 | Workforce Enablement | | |
|
| PR06613 | *RECORDS* Folder Implementation | 10/30/17 | 1/30/18 | Approved | Started | | | | | | | | | | | $39,391 | | | | | | High | BE - WE - Workplace Services | ET Project Budget | Security | Michelle Sa | Steve T | 11/7/17 | Other | | /DTSS Other (1031)/Shared-Other (1526) |
|
| PR04434 | FY16 SendMail Replacement (Phase 1) Assessment | 1/16/17 | 1/18/18 | Approved | Completed | | | | | | | $0 | | $40,000 | | $0 | | | | | | High | BE - WE - Workplace Services | ET Project Budget | Lights On | Michelle Sa | Steve T | 6/16/15 | Workforce Enablement | | |
|
| PR05177 | Email Foundations-Consolidation-UX: GroupID Phase 2 | 1/8/18 | 4/27/18 | Unapproved | Not Started | | | | | | | | | | | $40,000 | | | | | | Medium | BE - WE - Workplace Services | ET Project Budget | Security | Michelle Sa | Steve T | 5/9/16 | Workforce Enablement | | |
|
| PR04099 | FY15 Rightfax upgrade | 11/2/15 | 2/20/18 | Approved | Completed | | | | | | | $97,372 | | $41,755 | | $3,387 | | | | | | High | BE - WE - Workplace Services | ET Project Budget | Lights On | Michelle Sa | Steve T | 2/6/15 | Workforce Enablement | | |
|
| PR05189 | Gen4 Automation/Self-Service | 10/9/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $200,000 | | | | | | Low | BE - WE - Workplace Services | ET Project Budget | Hard Savings | Michelle Sa | Steve T | 5/11/16 | Workforce Enablement | | | /Workforce Technology |
| PR05193 | NextGen Voice Strategy and POCs | 9/1/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $200,000 | | | | | | Low | BE - WE - Workplace Services | ET Project Budget | Hard Savings | Michelle Sa | Steve T | 5/11/16 | Workforce Enablement | | |
|
| PR06633 | Multi-Factor Authentication for Email | 11/20/17 | 6/29/18 | Unapproved | Not Started | | | | | | | | | | | $250,000 | | | | | | High | BE - WE - Workplace Services | ET Project Budget | Security | Michelle Sa | Steve T | 11/17/17 | Other | | |
|
| PR05551 | ESPN Workforce Enablement Transition Costs | 10/3/16 | 10/28/17 | Approved | Completed | | | | | | | | | $391,212 | | $0 | | | | | | High | BE - WE - Workplace Services | ET Project Budget | Lights On | Michelle Sa | Steve T | 8/31/16 | Corporate Customer Driven | | |
|
| PR05840 | SendMail Replacement (Phase 2) Build/Deployment | 9/11/17 | 4/27/18 | Unapproved | Started | | | | | | | | | $80,000 | | $300,000 | $50,000 | | | | | High | BE - WE - Workplace Services | ET Project Budget | Service Risk | Michelle Sa | Steve T | 3/14/17 | Workforce Enablement | | /Corporate Segment (1737) | /Workforce Technology |
| PR05194 | WPS: Azure Premium Implementation | 6/6/17 | 9/28/18 | Approved | Started | | | | | | | | | | | $37,500 | $450,000 | | | | | High | BE - WE - Workplace Services | ET Project Budget | Security | Michelle Sa | Steve T | 5/11/16 | Workforce Enablement | | |
|
| PR05186 | FY17 Windows 10 Rollout Yr1 | 9/19/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $600,000 | | | | | | High | BE - WE - Workplace Services | ET Project Budget | Service Risk | Michelle Sa | Steve T | 5/11/16 | Workforce Enablement | | | /Workforce Technology |
| PR05174 | Vault Implementation and Ingest | 8/7/17 | 3/30/18 | Unapproved | Not Started | | | | | | | | | $100,000 | | $629,300 | | | | | | High | BE - WE - Workplace Services | ET Project Budget | Security | Michelle Sa | Steve T | 5/9/16 | Workforce Enablement | | |
|
| PR05179 | WPS: Citrix Upgrade | 6/6/17 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $780,000 | | | | | | High | BE - WE - Workplace Services | ET Project Budget | Service Risk | Michelle Sa | Steve T | 5/9/16 | Portfolio Lyfecycle Accelerator | | |
|
| PR04230 | FY15 SharePoint 2013 | 11/3/14 | 12/29/17 | Approved | Started | | | | | $0 | $0 | $1,070,564 | | $129,285 | | $98,001 | | | | | | High | BE - WE - Workplace Services | ET Project Budget | Hard Savings | Michelle Sa | Steve T | 4/6/15 | Workforce Enablement | | |
|
| PR05986 | FY18 Public Cloud Cost Optimization Analyst | 1/8/18 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $208,000 | | | | | | High | EIS - Digital Operations | ET Project Budget | Cost Avoidance | Chris L | Alexi | 5/12/17 | Cloud Accelerator | | |
|
| PR05983 | FY18 Cloud Integration and Automation | 1/8/18 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $520,000 | | | | | | Medium | EIS - Digital Operations | ET Project Budget | Cost Avoidance | Chris L | Alexi | 5/12/17 | Automation Acceleration | | |
|
| PR06330 | Migration off PCI-VLAN | 10/1/17 | 1/30/18 | Approved | Started | | | | | | | | | | | $100,800 | | | | | | High | EBS - Shared Services | ET Project Budget | Security | Wendy | Wendy | 7/20/17 | Compliance | | /DTSS Other (1031)/Shared-Other (1526) |
|
| PR06610 | SAP Data Masking for non-Prod | 7/1/18 | 12/30/18 | Unapproved | Not Started | | | | | | | | | | | $40,000 | $200,000 | | | | | | EBS - Shared Services | ET Project Budget | Security | Wendy | Wendy | 11/7/17 | Other | | |
|
| PR06211 | Complex Event Processing - Platform Monitoring | 12/1/17 | 8/1/18 | Approved | Started | | | | | | | | | | | $75,000 | $200,000 | | | | | Medium | EBS - Shared Services | ET Project Budget | Service Risk | Wendy | Wendy | 6/15/17 | Automation Acceleration | | |
|
| PR06215 | SAP and MiddleWare Platform refresh/Cloud migration | 4/1/18 | 1/30/19 | Unapproved | Not Started | | | | | | | | | | | $375,000 | | | | | | Medium | EBS - Shared Services | ET Project Budget | Service Improvement | Wendy | Wendy | 6/15/17 | Cloud Accelerator | | |
|
| PR06838 | CTaM Genome Bolt Integration | 4/1/18 | 6/30/19 | Unapproved | Not Started | | | | | | | | | | | $186,000 | | $125,000 | | | | High | EBS - Data | ET Project Budget | Service Improvement | Sapna | John K | 3/23/18 | Strategic Data Accelerator | | |
|
| PR05879 | CTaM ATG Integration | 7/3/17 | 3/30/18 | Approved | Not Started | | | | | | | | | | | $95,000 | $473,572 | | | | | High | EBS - Data | ET Project Budget | Service Improvement | Sapna | John K | 3/31/17 | Strategic Data Accelerator | | |
|
| PR06741 | BPAC Migration to Torch Platform | 4/1/18 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $100,000 | $400,000 | | | | | | EBS - Data | ET Project Budget | New Capabilities | John K | John K | 2/7/18 | Other | | | /Enterprise Data Solutions and Services |
| PR06327 | Torch Platform Decommission (Related to: PID: PR04920) | 4/1/18 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $900,000 | $900,000 | | | | | High | EBS - Data | ET Project Budget | Hard Savings | John K | John K | 7/19/17 | Strategic Data Accelerator | | |
|
| PR06312 | Data Sharing (Pub/Sub) - FY18 - Discovery UI | 4/1/18 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $324,000 | $405,000 | | | | | High | EBS - Data | ET Project Budget | Security | Joe K | John K | 7/14/17 | Strategic Data Accelerator | | |
|
| PR05241 | Data Sharing (Pub/Sub) - FY17 & 18 | 2/13/17 | 9/30/18 | Approved | Started | | | | | | | | | $216,000 | $90,615 | $72,000 | $799,992 | | | | | High | EBS - Data | ET Project Budget | Service Improvement | Joe K | John K | 5/26/16 | Strategic Data Accelerator | | |
|
| PR06340 | Succession Planning - Solution Evolution & Modeling Tool | 9/26/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $200,000 | $300,000 | | | | | | BE - CE - Human Resources | ET Project Budget | New Capabilities | Shawn | Chris K | 7/21/17 | Other | | /TWDC Corporate (1032)/HR (1811) | /Business Applications Services/HR Applications |
| PR06769 | O365 Mail Interim Security Monitoring | 2/26/18 | 6/15/18 | Approved | Not Started | | | | | | | | | | | $171,000 | | | | | | High | Business Enablement | ET Project Budget | Lights On | Andrew | Chris La | 2/23/18 | Security | | |
|
| PR05284 | Active User Licensing: Data/Reporting Pilot | 7/3/17 | 1/4/18 | Approved | Started | | | | | | | | | $100,000 | | $0 | | | | | | High | Business Enablement | Direct/Organizational Budget | Foundational Improvement | Holly | Chris La | 6/2/16 | Strategic Data Accelerator | | |
|
| PR05380 | Enterprise Digital Asset Search - PAR #5 - Creative Asset Search Continuation | 7/15/16 | 12/31/16 | Approved | Completed | | | | | | | $50,000 | | | | | | | | | | High | Business Enablement | ET Project Budget | New Capabilities | vipul | Chris La | 6/27/16 | Strategy-Innovation-R&D | | /TWDC Corporate (1032) |
|
| PR04990 | Enterprise Digital Asset Search – Par #4 of 4 - Nemo Beta Build | 3/1/16 | 10/19/16 | Approved | Completed | | | | | | | $165,640 | | $0 | | | | | | | | High | Business Enablement | ET Project Budget | New Capabilities | vipul | Chris La | 2/8/16 | Strategy-Innovation-R&D | | |
|
| PR04275 | Finding Nemo - Digital Asset Management Search - Phase 2 | 10/5/15 | 2/3/17 | Approved | Completed | | | | | | | $192,000 | | $0 | | | | | | | | High | Business Enablement | ET Project Budget | New Capabilities | vipul | Chris La | 5/5/15 | Strategy-Innovation-R&D | | |
|
| PR04563 | Enterprise Digital Asset Search – Nemo Alpha Builds | 8/7/15 | 6/23/17 | Approved | Completed | | | | | $55,120 | | $190,920 | $0 | | | | | | | | | High | Business Enablement | ET Project Budget | New Capabilities | vipul | Chris La | 8/7/15 | Strategy-Innovation-R&D | | | /Business Applications Services |
| PR06120 | FY18 KPMG MSFT SQL & Windows True-up | 1/4/18 | 4/28/18 | Approved | Started | | | | | | | | | | | $210,000 | | | | | | Medium | EIS - Program Mgmt and Governance | ET Project Budget | Hard Savings | Adrian | Andy | 6/6/17 | Other | | |
|
| PR05270 | ES:Engineering:Security:PAR:Secure-SDLC | 10/3/16 | 4/15/18 | Approved | Started | | | | | | | | | $364,000 | | $386,000 | | | | | | High | EAS - Engineering | ET Project Budget | Security | CJ | Eric L | 6/2/16 | Security | | |
|
| PR06478 | ES: OneID - Marvel Onboarding | 9/8/17 | 12/31/17 | Approved | Completed | | | | | | | | | | | $20,000 | | | | | | High | EAS - Engineering | ET Project Budget | New Capabilities | Irene | Eric L | 9/8/17 | Personalization and Consumer ID | | /Marvel (1819) |
|
| PR06216 | SAP Data Encryption | 7/1/18 | 9/30/18 | Unapproved | Not Started | | | | | | | | | | | $25,000 | $500,000 | | | | | High | EBS - Shared Services | ET Project Budget | Security | Wendy | Wendy | 6/15/17 | Security | | |
|
| PR06322 | SAP Suite on HANA Migration | 7/1/18 | 5/1/19 | Unapproved | Not Started | | | | | | | | | | | $150,000 | $1,251,000 | $150,000 | $1,249,000 | | | High | EBS - Shared Services | ET Project Budget | Service Improvement | Wendy | Wendy | 7/19/17 | Tech Optimization Acceleration | | |
|
| PR06278 | FIRE Nuix Digital Forensics | 6/23/17 | 9/29/17 | Approved | Started | | | | | | | | | $31,000 | | | | | | | | High | Information Security Operations & Remediation Services | Direct/Organizational Budget | Foundational Improvement | Felana | connie | 6/23/17 | Security | | /DTSS Global Information Security (1347) | /Global Information Security/Information Security Operations |
| PR06127 | FY19 Demolish Security Shack | 10/3/18 | 1/31/19 | Unapproved | Not Started | | | | | | | | | | | | | $60,000 | | | | Low | EIS - Ops & Service Delivery | ET Project Budget | Service Improvement | Dan A | Denis | 6/7/17 | Other | | |
|
| PR03354 | FY15-18 ODC - Switchgear Replacement Phase Three:SUB:Capital | 10/1/14 | 4/30/18 | Approved | Started | | | | | | $877,257 | | $5,760,220 | | $3,569,738 | | $1,050,027 | | | | | High | EIS - Ops & Service Delivery | ET Project Budget | Lights On | Dan A | Denis | 6/3/14 | Continuous Availability | | |
|
| PR06128 | FY18 KMTC SWG Redundant Control Circuit - Installation | 10/2/17 | 9/28/18 | Unapproved | Not Started | | | | | | | | | | | $58,500 | | | | | | Medium | EIS - Ops & Service Delivery | ET Project Budget | Service Risk | Jim L | Denis | 6/7/17 | Continuous Availability | | |
|
| PR06485 | Cloud Program Architecture - KMS/Tech Writer | 9/5/17 | 3/30/18 | Approved | Started | | | | | | | | | $35,000 | | $103,000 | | | | | | | Enterprise Infrastructure Svcs | ET Project Budget | Hard Savings | Candace | Charlie | 9/11/17 | Cloud Accelerator | | |
|
| PR05981 | FY17 Cloud Accelerated Migrations - Wave 1 POC | 5/22/17 | 12/26/17 | Approved | Started | | | | | | | | | $585,000 | | $0 | | | | | | High | Enterprise Infrastructure Svcs | ET Project Budget | New Capabilities | Candace | Charlie | 5/12/17 | Cloud Accelerator | | |
|
| PR06615 | MSEA: Microsoft Enterprise Agreement Renewal Project | 10/30/17 | 3/31/18 | Approved | Started | | | | | | | | | | | $215,000 | | | | | | | Business Enablement | Direct/Organizational Budget | Lights On | Sue | Charlie | 11/9/17 | Other | | | /Enabling Functions/Technology Business Operations and Strategy/Business Operations |
| PR04956 | Corporate Risk Management - Production Safety LMS | 2/1/16 | 9/30/17 | Approved | Started | | | | | | | $18,975 | | $6,325 | | | | | | | | Medium | BE - CE - BTP - Finance | Direct Billed | New Capabilities | Nick S | Steve Non | 12/24/15 | Corporate Customer Driven | | /TWDC Corporate (1032)/Risk Management (1981) |
|
| PR05834 | Corporate Risk Management – Archangel Pilot | 4/17/17 | 12/31/17 | Approved | Started | | | | | | | | | $80,000 | | | | | | | | | BE - CE - BTP - Finance | Direct Billed | New Capabilities | Nick S | Steve Non | 3/9/17 | Other | | /TWDC Corporate (1032)/Risk Management (1981) |
|
| PR06310 | Corporate Risk Management - Safety Management System | 6/30/17 | 6/30/18 | Unapproved | Not Started | | | | | | | | | | | $295,000 | | | | | | | BE - CE - BTP - Finance | Direct/Organizational Budget | Foundational Improvement | Nick S | Steve Non | 7/12/17 | Other | | /TWDC Corporate (1032)/Risk Management (1981) |
|
| PR03199 | Corporate Risk Management - Business Continuity Management Tool Implementation | 1/1/14 | 9/28/18 | Approved | Started | | | | | $363,848 | | $72,724 | | | | | | | | | | High | BE - CE - BTP - Finance | Direct Billed | Foundational Improvement | Chris T | Steve Non | 4/22/14 | Other | | /TWDC Corporate (1032)/Risk Management (1981) |
|
| PR06135 | FY18 Refresh DTSS Scheduling | 10/2/17 | 9/28/18 | Approved | Started | | | | | | | | | | | $163,000 | | | | | | | EIS - Ops & Service Delivery | ET Project Budget | Service Improvement | Kelly | robert W | 6/7/17 | Other | | |
|
| PR05326 | FY17-18 Compliance Management & Configuration Service (CMCS) Tool and Service | 7/1/18 | 9/29/18 | Unapproved | Not Started | | | | | | | | | | | $400,000 | | | | | | Medium | EIS - Ops & Service Delivery | ET Project Budget | Security | Scott T | Robert w | 6/21/16 | Enterprise Business Intelligence | | |
|
| PR06118 | FY18 Cloud Service Management Knowledge Management System | 10/6/17 | 1/30/18 | Unapproved | Not Started | | | | | | | | | | | $94,000 | | | | | | High | EIS - Program Mgmt and Governance | ET Project Budget | Service Improvement | Adrian | Mara | 6/6/17 | Cloud Accelerator | | |
|