Learning objectives

  • Articulate the purpose of the control phase
  • List most commonly used tools in the Control phase

Lean Six Sigma Green Belt

Introduction to Control

IIL-LSSGB

7-00-*

Goal of the Control Phase

The goal of the Control Phase is to:

  • Keep track of the process and results

  • Prepare to respond proactively as needed
  • Ensure long-term success of the DMAIC project

Lean Six Sigma Green Belt

Introduction to Control

IIL-LSSGB

7-00-*

Roadmap – Control Phase

Define

Houston, we

have a problem

Measure

How bad is it?

Analyze

Find the

Root Cause

Improve

Fix it- Eliminate

Root Cause

Control

Make it

stay fixed

Control Plan

Control Charts

Project Close Out

Lean Six Sigma Green Belt

Introduction to Control

IIL-LSSGB

This roadmap shows the activities and tools of the Control phase. It is designed to give you a good overview of the main steps in Control.

7-00-*

Learning objectives

  • Articulate the purpose of the control phase
  • List most commonly used tools in the Control phase

Lean Six Sigma Green Belt

Introduction to Control

IIL-LSSGB

7-00-*

© 2012 International Institute for Learning, Inc.

Thank you!

© 2014 International Institute for Learning, Inc.

7-00-*

IIL-LSSGB