Control chart
© 2012 International Institute for Learning, Inc.
DS – 624
Quality Management
© 2014 International Institute for Learning, Inc.
7-00-*
IIL-LSSGB
Learning objectives
- Articulate the purpose of the control phase
- List most commonly used tools in the Control phase
Lean Six Sigma Green Belt
Introduction to Control
IIL-LSSGB
7-00-*
Goal of the Control Phase
The goal of the Control Phase is to:
- Keep track of the process and results
- Prepare to respond proactively as needed
- Ensure long-term success of the DMAIC project
Lean Six Sigma Green Belt
Introduction to Control
IIL-LSSGB
7-00-*
Roadmap – Control Phase
Define
Houston, we
have a problem
Measure
How bad is it?
Analyze
Find the
Root Cause
Improve
Fix it- Eliminate
Root Cause
Control
Make it
stay fixed
Control Plan
Control Charts
Project Close Out
Lean Six Sigma Green Belt
Introduction to Control
IIL-LSSGB
This roadmap shows the activities and tools of the Control phase. It is designed to give you a good overview of the main steps in Control.
7-00-*
Learning objectives
- Articulate the purpose of the control phase
- List most commonly used tools in the Control phase
Lean Six Sigma Green Belt
Introduction to Control
IIL-LSSGB
7-00-*
© 2012 International Institute for Learning, Inc.
Thank you!
© 2014 International Institute for Learning, Inc.
7-00-*
IIL-LSSGB