Control charts To create a control chart
are used to monitor and improve processes collect subgroups (samples) of process output over time
data is collected over time calculate sample statistics for each subgroup
past performances are use to predict future outcomes plot the statistics over time
add control limits (ususally within +- 3 standard deviations of the statistic of measure
Phase 1 control charts Goals are to find patterns over time and points that fall outside limits
analyzed at the start of a process to determine where improvements are needed
Phase 2 control charts
analyed after improvements have been imposed
Causes of variation
special and common
special causes are correctable without changing the process
common cause variation is inherit in the process (random)
common cause variation (no points outside limits) - stable process - in control - predictable
A rule of thumb is 8 or more consecutive points
above or below the center line may indicate a trend
special cause variation (point outside limit) - out of control process
unpredictable

p chart

used for categorical variables
ni = Number of observations
to find p-bar (mean) divide sum of pi by the number of observations
number of Days 10
subgroup size 100 Generate the plot
p-bar (p-bar(1-p-bar))/ni UCL LCL pi LCL UCL
Day defects proportion (pi) defects per day 0.147 0.00125391 0.2532317749 0.0407682251 0.12 0.041 0.253
1 12 0.12 0.14 0.041 0.253
2 14 0.14 0.1 0.041 0.253
3 10 0.1 0.18 0.041 0.253
4 18 0.18 0.21 0.041 0.253
5 21 0.21 0.14 0.041 0.253
6 14 0.14 0.15 0.041 0.253
7 15 0.15 0.12 0.041 0.253
8 12 0.12 0.15 0.041 0.253
9 15 0.15 0.16 0.041 0.253
10 16 0.16
sum of pi 1.47
p-bar (mean) 0.147
pi 0.12 0.14000000000000001 0.1 0.18 0.21 0.14000000000000001 0.15 0.12 0.15 0.16 LCL 4.0768225092489396E-2 4.0768225092489396E-2 4.0768225092489396E-2 4.0768225092489396E-2 4.0768225092489396E-2 4.0768225092489396E-2 4.0768225092489396E-2 4.0768225092489396E-2 4.0768225092489396E-2 4.0768225092489396E-2 UCL 0.25323177490751059 0.25323177490751059 0.25323177490751059 0.25323177490751059 0.25323177490751059 0.25323177490751059 0.25323177490751059 0.25323177490751059 0.25323177490751059 0.25323177490751059

Number of Days

Probability

c chart

monitors errors in an area of opportunity (space, time, etc)
number of areas(time) sampled (n) 10 ci is the number of errors in area i
Graph the chart
Day errors (ci) Ci UCL LCL
1 7
2 3
3 6
4 3
5 4
6 5
7 3
8 5 SQRT is the square root feature in Excel
9 2
10 0
sum ci
c-bar (Mean)

r chart

Use when observation size is 10 or less
Is the process range in control?
number of days collection occurs (k) 10
observation size (use in control constants table) 5 Graph the process
From Control table
Day 5 delivery times collected each day (Xi) Ri R-bar D3 D4 UCL LCL
1 6.7 11.7 9.7 7.5 7.8
2 7.6 11.4 9 8.4 9.2
3 9.5 8.9 9.9 8.7 10.7
4 11 9.9 11.3 11.6 8.5
5 8.3 8.4 9.7 9.8 7.1 D3 and D4 are control group constants
6 9.4 9.3 8.2 7.1 6.1 they represent relations between variation and mean for a given sample size
7 10 10.7 9 8.2 11 values are found in tables
8 9.5 10.5 7 8.6 10.1
9 7.8 9 12 9.1 11.7
10 9.9 10.1 8.9 9.6 7.1
sum Ri
R-bar