Personal Protective equiPment: needed at this worksite? Yes no Do not know

HarD Hats comments

1. Supplied by employer Yes No Not Needed DK

2. Worn when required Yes No DK

Boots

1. Supplied by workers Yes No Not Needed DK

2. Worn when required Yes No DK

Hearing Protection

1. Supplied by employer Yes No Not Needed DK

2. Worn when required Yes No DK

eYe Protection

1. Supplied by employer Yes No Not Needed DK

2. Worn when required Yes No DK

resPiratorY Protection

1. Supplied by employer Yes No Not Needed DK

2. Training provided Yes No DK

3. Worn when required Yes No DK

laDDers: are present at this worksite? Yes no Do not know

1. Correct size for the job Yes No DK

2. Fully opened and spreader bars locked Yes No DK

3. Firm foundation for ladder feet Yes No DK

4. Proper climbing procedures Yes No DK

5. Three-point contact rule followed Yes No DK

6. Free from obvious defects Yes No DK

7. Workers stand below top 2 steps Yes No DK

8. extend more than three feet above support Yes No DK

City, Street/Address

Observer (Initials) Date Observed

CheCklist Completed: (Check all boxes that apply)

From sidewalk (Not working here)

Off-Site before or after work

On-Site

instruCtions

every section of the audit should have a check :

Yes = Observed and in compliance no = Observed and not in compliance not needed = Not present on jobsite dk = Do not know

CONSTRUCTION SAFETY CHECKLIST Find and record common construction hazards.

Page 2

scaffolDs: are present at this worksite? Yes no Do not know

1. Fall protection used if over 10 feet tall Yes No DK

2. Set up on level, stable footing Yes No DK

3. Platform is appropriate width for type of scaffold Yes No DK

fall Protection: needed at this worksite? Yes no Do not know

1. Fall protection provided for heights 6 ft. or more Yes No DK

2. Harness is worn properly and attached to Yes No DK secure anchorage

3. Slide guards are installed across full width and all sides Yes No DK

4. guardrails set up for openings >6’ above lower level Yes No DK

5. guardrails are constructed sturdily with 2 x 4s Yes No DK

macHine HazarDs: are power tools and machines used at this site? Yes no Do not know

1. Workers are trained on the use of power tools. Yes No DK

2. Workers have appropriate PPe and keep clothing away Yes No DK

3. Workers are trained prior to using nail guns Yes No DK

4. Tile and concrete are cut with wet methods Yes No DK

Heat stress: is heat a major problem at this site? Yes no Do not know

1. Have workers been trained on preventing and Yes No DK recognizing heat-related illness?

2. are workers provided with enough water and Yes No DK appropriate rest breaks?

leaD Paint HazarDs: is the site at risk for lead-contaminated dust? Yes no Do not know

1. Have workers been trained on handling lead dust? Yes No DK

2. Is the work area properly contained? Yes No DK

electrical HazarDs: are present at this worksite? Yes no Do not know

1. Work on electrical circuits or energized equipment Yes No DK is begun only after all power sources have been identified, de-energized and locked out or tagged out.

2. Overhead and underground electrical power lines Yes No DK are located, identified, and avoided.

3. Ladders, scaffolds, equipment or materials more Yes No DK than 10 feet from any electrical power lines

excavations: are present at this worksite? Yes no Do not know

1. Soil and conditions are inspected everyday Yes No DK

2. Safe exits (ladders) for excavations greater Yes No DK than 4 ft. deep

3. Shoring, shielding, and inclination assessed Yes No DK for excavations greater than 5 ft. deep

Page 3

actions or cHanges

1. Talked to your organizers about health and safety Yes No concerns and possible changes/training

2. Talked to co-workers about health or Yes No safety concerns

3. Talked to foreman or contractor about health Yes No or safety concerns

4. Suggested changes in equipment or Yes No procedures to co-workers

5. asked foreman or contractor for changes Yes No in equipment or procedures

6. asked foreman or contractor for training Yes No for self and/or co-workers

comments:

© 2014, CPWR – The Center for Construction Research and Training. All rights reserved. CPWR is the research, training, and service arm of the Building and Construction Trades Dept., AFL-CIO, and works to reduce or eliminate safety and health hazards construction workers face on the job. Production of this card was supported by Grant OH009762 from the National Institute for Occupational Safety and Health (NIOSH). The contents are solely the responsibility of the authors and do not necessarily represent the official views of NIOSH.