Test Case

profileceaukis28c
ConnieFarris_Group1_Unit3_GP_12-05-2019.docx

2

APPLICATION DEVELOPMENT 1

\

Connie Farris

Group 1

Participating Members

Raphael Brown

Shaun Cummings

Matthew Dunn

Deandre Kralevic

Colorado Technical University

IT Capstone II (IT488-1904B-01)

Abstract

This document will consist of 5-weeks of work, which will have 6-group members developing this document. The project will contain 10 total sections with a Quality Management Report Template inserted at the end of section 10 just before References. The Project sections will consist of the following:

Section-1: Overview of the project from IT487

Section-2: Requirements for the project from IT487.

Secton-3: The Design of the project from IT487

Section-4: System Development Methodology.

Section-5: Work Breakdown structure.

Section-6: Communication plan

Section-7: Quality Assurance Plan.

Section-8: Documentation Plan.

Section-9: Quality Assurance and results of test-case execution.

Section-10: Project closure

Quality Management Report Template

References.

There will be discussions via the Group Discussion Board, Group Email, Chat sessions, and through the CTU Messenger.

Table of Contents (Week 1) Section 6: Communication plan 14 Communication Matrix 16 Description of the type of quality planning 17 Roles 18 Coordination 19 Tasks and Schedule 20 Unit testing plan 20 Unit Test Plan Test Cases 21 Plan for integration, system, and regression testing 23 Integration 23 System Testing 25 Regression Testing 26 Quality metrics 26 System Defect Analysis 27 Software Defect Report Template 28 Risk management strategies 29 Risk Management 29 Risk Source 30 Project Risk Analyses 31 Qualitative 31 Quantitative 31 Conclusion 31 (Week 3) Section 8: Documentation plan 33 User Documentation 33 Document Control Plan Maintenance 33 Document Control Plan Updates 35 User Document Templates 36 Systems/Network Administration Manual Template 40 System/Network Administration 45 User and Group Accounts 46 Server Administration 49 Printer Administration 49 Security Procedures 50 Backup Procedures 55 Inventory Management 57 Section 10 – Project closure 60 QUALITY MANAGEMENT REPORT TEMPLATE 61 References: 102

(Week 1) Section 1: Overview of the project (from IT487)

Overview

The Galactic Customer IT Services is an IT support company with over 250,000 employees with companies in 50 States with the main headquarters located in Gainesville, FL. The location chosen for the headquarters is based on a Telco Gateway Infrastructure that the main fiber-optic trunk line runs along the I-75 corridor, from Miami Lakes FL to the most northern part of Michigan. This I-75 corridor plays an important part of the Networking ability for the organization. The Galactic Customer IT Services is an IT support company, which provides IT support to various small to large companies both within the Unites States and support to various military bases overseas. This large customer service company has installed an application software to its large Help Desk ticketing system.

The next phase to implement is the upgrading of its Networking Infrastructure. This Organization has several new updated Servers ready to install on the network. With the previous project being accepted the organization has decided to move forward to improving its networking infrastructure, however the organization has requested that the project team to draft a plan that requires the following in the plan: Requirements, Design, System Development Methodology, WBS (Work Breakdown Structure), Communications Plan, Quality Assurance Plan, Documentation Plan, and Quality Assurance and results of test-case execution be the project can be closed.

I75 Corridor

http://gregkantner.com/blog/wp-content/uploads/2012/05/interstate-75-map.gif

(Week 1) Section 2: Requirements (from IT487)

The project requirements will come from the software requirements for the Galactic customer services. The project was to create a new ticketing software that the customer wanted upgraded and to completely replace the previous product. The requirements are the following:

· Ticket system

· Ticketing automation forwarding system

· VoIP system for out of country calls

· Application that delivers automated workflow

· Application that handles auto-updates and simple to intermediate patches

The ticketing system that we have to create has to follow the design that the stakeholders and owners expect. A ticketing system that needs to be omni-channel supported, which is a type of support that gives the customer using the product the ability to utilize the application from any multiple sources. This includes phone, email, self-service ticket creation via application, and walk-in visits to the company itself. (Andrews, 2019)

This application requires a section that allows the system to process incoming tickets and to be able to route the ticket to the appropriate IT support personnel. This system will require the capability to allow the user to select in detail what their issue is, select the department the issue pertains too, and select the level of importance the user the believes the issue is. However, the end-used will not decide the level of importance, the automated system will determine the level of importance by keywords located in the ticket and which section the ticket is for. (Andrews, 2019)

The VoIP telecommunication is crucial to the company’s success of providing adequate care to its overseas and out of state clients. Companies that must call into the main HQ in Gainesville, FL, do not want to spend the extra money for long distance phone calls. Instead the stakeholders have insisted on requiring an easier more cost-efficient way of telecommunication for the long-distance entities. VoIP will utilize a private VPN that will allow the client and HQ to speak directly with each other over the internet rather than use a phone company that will hike up prices of telephone usage. (Unknown, 2019)

The application portion of the software will be able to create self-service tickets while also being able to create and recommend updated software while providing the adequate information to patch the current software if needed. This is a valuable part of the software because it allows the end users the ability to fix issues and low-level problems themselves or have the automated service patch the issue if possible. Having that service will provide the client and the service provider to spend more time on conducting business as usual instead of losing time and money waiting to speak to an operator or having their ticket cleared.

.

(Week 1) Section 3: Design (from IT487)

Below is a design diagram that I did for the team project from the last course, as you see it was for an online ticketing application. As seen, you have customers that can communicate to the customer service group via the Internet, which will connect by way of a secure VPN that links to the online ticketing application, which connects to the ticket automation part of the system and sends tickets to customer service operators. As you can see the system is simple and yet can be complicated.

Drafted and Imported from my Smart Draw Software 16 November 2019

Now the team is working on the Networking portion for the organization. The organization will have to send out service technicians to customers for issues that are not resolved by remote access for customers that the help deck could not resolve. Even though the main hub is in Gainesville, FL there is a remote site in every State located in one of the major cities. Below is a diagram depicting a replica of the network that will connect all areas where trouble tickets will print for the service technicians.

Drafted and Imported from my Smart Draw Software 16 November 2019

The ticketing application servers will be in Gainesville, Florida. The network will consist of Voice over Internet Protocols (VoIP), IP routing, DS3 lines to the ISPs (Internet Service Provider) HTML protocols will be in use and the HTTPS protocol. The Organization will be utilizing Secured Virtual Private Network services

(Week 1) Section 4: System development methodology

For the creation of our network that will work with the Galactic Customer Service unit we will implement the Waterfall methodology. This method is a slow starter but once it gets in the design and development stages it fairs great because of the long planning. The waterfall approach begins with multiple meetings that allows the stakeholders, owners, dev team, and customer to brainstorm and come up with detailed plans to ensure that the entire project is open for viewing from beginning to end. The reason for this choice is because the very detailed structured documentation of the project. (Rouse, 2019) This structure allows our group to follow step by step to ensure the success of the project and guarantee that nothing gets overlooked. The planning stages increases the efficiency of the project while allowing all avenues open to view. This is to include all risks and threat factors. During the planning stage, the group will come together to discuss probable/possible risks that could come along during the development stage. Once all factors meet satisfaction, then the plans made available to create a risk mitigation process. (Rouse, 2019) This will allow the team to know how to mitigate/avoid certain risks that come along.

Another factor in choosing this method is the fact that the personnel on the development team can be interchangeable. This means that if six people start the project and one or two decide to leave or let go, the process can continue as planned. This works well also if other people come in to fill those vacant position. It allows the process to continue as planned without a lag in the development process because of the detail in the plans. With the way our remote communication is set-up, communication issues are sure to occur. With that being said, the waterfall method is the appropriate choice since the approach is our way of risk mitigation.

(Week 1) Section 5: Work breakdown structure

Collection of data and analysis will merge at the same time in the planning phase, which will help to establish the needs of stakeholders. The process is supposed to take one week where the project crew will collect all the information from vendors, customers, and stakeholders. This will help to decide the features expected from the program. The next process is coming up with integration tools and this step will take approximately 3 weeks due to the complex nature of the process.

Time and cost should be well managed and thus testing and development of the project features will be conducted simultaneously. Actual testing of the application on vendors and customers will provide real-time support that greatly aids in the development and implementation of security measures to reduce risk. Real-time support also helps greatly to reduce the effects of malfunctioning on the business and also try to establish the vital features that may not get into the development phase. This phase will take no more than 3 weeks to complete. The development team will actively fix any malfunctioning of the application.

The last process is monitoring how the application is performing. The team will offer oversight for support for example database administration or cloud-based services. Cloud-based services always have various security features in place to ensure information communicated through the network resource is reliable and secured properly (Dennis, 2018).

(Week 1) Section 6: Communication plan

The system will utilize the use of automated response system which will always ensure that customers and vendors get real-time as well as proper company support using well-organized customer service. The applications design is in a way that whenever a customer logs into the system, there is an automatic query popping out prompting the customer to chat with the client about anything they may wish to enquire about the company.

Customer satisfaction is very essential; therefore, there is the need to properly track customer and client communication. To ensure there is monitoring, the application will have to always produce a copy of the communication between the companies; client and other users. This will easily provide an oversight authority for tracking the communications there; the business managers can check if the clients are useful to the business. This approach is very beneficial in determining if the application effectively provides customer satisfaction.

The alignment of stakeholders’ requirements and the applications design will ensure the organization has attained operational effectiveness. The organization will attain improved productivity if the customer service application is working properly (Lin, 2007).

Regarding the quality of communication, the application architecture, this is put together in model form in a way that response will give the preferred quality assurance to the customers by the utilization of automated systems. Using automated alert applications in the automation strategy will ensure that customers’ issues are properly and in time. Communication quality will enhance ability by ensuring every stakeholder’s requirements meet their expectations since different people have different interests. Additionally, it also aids in ensuring the right design gets put together properly.

Communication Matrix

Stakeholder

Risk Content

Method

Frequency

Project Managers, Team Members

cost

email

As required

Program Manager, Project Managers

performance

memos

weekly

Program Manager

training

Manager program control file

As needed

Program Director,

schedule

email

As required

(Week 2) Section 7: Quality Assurance Plan

Description of the type of quality planning

Objective

The objective of our Quality Assurance plan is to create a product that has these qualities (Spacey, 2017):

· Stability

· Availability

· Reliability

· Timeliness

· Accuracy

· Durability

To ensure that our product meets those criteria, we have decided to implement these specific objectives to produce the best product for the customer. The objectives are as follows:

· Connection speed should allow fast VoIP connection and create and easy connection for customers/employees to utilize the ticketing system.

· Front-line employees should have adequate training on new network capabilities and its usage.

· Ticketing system should connect to the network within the building in approximately 30 seconds while the outside connectors should only experience a 1-minute delay depending on the connection speed of their internet service. **Allow for up to 2.5 minutes with a 50Mbps internet speed connection**

· Employees should be able to connect to the network 99.99% of the time.

· The new network should accurately (90%) deliver service to the customer service application to allow employees the ability to actively connect to satisfy their customer incident reports.

· Network should not experience any drops of service during business peak hours.

· Maintenance needs adequate training and have a 1-2-hour response time, either remotely or if need physically.

Our company is looking to provide a service that is 100% defect free. We will continue to monitor and test until the system is working at the levels that meet the customer’s requirements and our own.

Roles

After the objectives are in place it is time to put a QA team together. Once we have the team together, we will then assign roles. Each role has a specific duty that needs assigning to team members where they need to follow the detailed specifications outlined in the requirements and specification phase of the waterfall method (Unknown, 2018). The roles are breaking down in the following matter:

QA Manager (QAM): The QA Manager responsibility will be to supervise the actions of the members of his/her team. He/she is responsible for selecting the members of his team and providing them with the job assignment that fits their skill set. The QA Manager will be the person that is responsible for creating and disseminating the final report for the QA assessment.

Manual QA Engineer (MQAE): The responsibility of the MQAE is to develop the software/hardware needed in order to manually test components and/or separate sections of application software.

Test Automation Engineer (TAE): The responsibility of the TAE is to develop the software that will be using to conduct the portions of the system that run automatically.

Business Analyst (BA): Acts as the liaison between the upper management and the QA teams. Ensures that the application and the network it runs on is meeting expectations.

QA Analyst (QAA): The QAA is the person that goes beyond the testing and does an evaluation of the network. It’s often said that this member of the team goes off script to see if they can find anything that unusual with the product.

(Eisenberg, 2019)

Coordination

In terms of coordination, this basically involves making sure that the QA plan does not overlap or contradict another plan in place. It is vital that we plan and check with other plans in the work such as risk management plan. The QAM will be responsible to ensure that the QA plan does not contradict another plan and vice versa.

Tasks and Schedule

Unit testing plan

Objective

The objective of the unit testing plan is to provide the team doing the testing the help needed in validating the quality of the software that is in the testing phase. It also helps those outside of the testing team like developers and others involved in the process. “In the test plan there are important aspects that are documented such as test scope, test strategy, and test estimation.” (Guru99, 2019) Unit testing is one of the levels of testing within a quality assurance plan. In my opinion it is the most important of all testing sequences. It is the first level of testing. The testing in done in individual units or components, whether it is software or any other type of product being in development. The main purpose of a unit testing plan is to validate each unit of a product or software meet what the design is to do.

Within the Unit Test Plan there are test cases that will need documenting and each one scheduled. I will show ten major test cases relating to this project shown in a table form.

Unit Test Plan Test Cases

Test Case ID

Test Discription

Test Data

Expected ResUlts

Actual Results

UT-1

Final ticketing application test

End-user input data

Tickets Print out to screen

Test passed 11/06/2019

UT-2

Ticketing system network connection test

Data from ticketing system sent to router

Data packets seen at router

Test passed 11/16/2019

UT-3

ISP Cloud circuit test

Data Test packets set from router

Data packet arrive at ISP cloud

Test passed 11/21/2019

UT-4

DS3 circuit tests

Data test packets sent from host site and remote sites to the ISP

Data test packets reach destinations

Test passed 11/23/2019

UT-5

Bandwidth test

Network bandwidth test to meet specifications

No bottleneck in the network

Test passed 11/18/2019

UT-6

Network throughput speed test

Network throughput test to meet specifications

Network speed to reach specifications

Passed on 11/20/2019

UT-7

VPN circuit test

Test data reaches remote site from host site

Test data arrives at destination site

Test passed 11/18/2019

UT-8

VoIP connection speed test outbound

VoIP data packets sent to the ISP cloud and the cloud receives it

VoIP data sent form the cooperate office to the ISP cloud

Test passed 11 22/2019

UT-9

VoIP connection speed test Inbound

VoIP data packets sent from the ISP cloud and received

VoIP data packets reach the cooperate office from the ISP Cloud

Test passed 11/22/2019

UT-10

End point tests ping test

Ping test to the remote sites

Ping test packet reached

Passed 11/27/2019

Plan for integration, system, and regression testing

Integration

Integration testing will test the integration of each module using the Bottom-Up Approach. This will test each module by testing each child module with the parent module. This will be an efficient way to find errors, bugs, and other problems between each module.

Integration Test

Test ID

Test Name

Test Description

Assumption

Impact

F1-E1

Ticket Template

Display a template for user

Template displayed for user without error

High

F1-E1.1

Special Characters

Limit of special characters

Special characters will be limited to prevent the ability to run code

High

F1-E1.2

Character length

Max character length set to 250

Characters limit applied to improve performance

Low

E1-D1

Ticket Validation

Test for ticket completion

Ticket has all required fields completed

High

E2-D2

Ticket Forwarding

Ticket forwarded to server

Ticket forwarded

Med

E3-D2

Ticket Update

Ticket sent for update

Ticket on standby for update

Med

D1-C1

Ticket Creation

Ticket created without error

Ticket created successfully without error

Med

D2-C1

Ticket Automation

Ticket on standby for forwarding/updating

Ticket ready for forwarding to remote server

Med

C1-B1

Ticketing

Ticket created, validated, and updated. Available to GUI. Forwarded to server.

Ticketing is available within the GUI

High

C2-B1

Remote Server

User has access to remote server

Remote server has access to send/retrieve tickets

High

C3-B2

Apply Patch

Patch received and sent for application

Patch on standby

Med

C4-B2

Apply Update

Update received and sent for application

Update on standby

Med

System Testing

System Test

Test ID

Test Name

Test Description

Assumption

Impact

S-1

User interaction

User has access to GUI and features

User has access to all features within the application

Med

S-2

UI functionality

All buttons function

All buttons will function as expected

Med

S-3

Ticket Creation (Locally)

User can create a ticket

User can successfully create a ticket

High

S-4

Ticket Creation (remotely)

User can create a ticket

User can successfully create a ticket

High

S-5

System interaction

System can interact with other sub-systems

System can successfully update, retrieve, and edit tickets across sub-systems

High

S-6

Performance Test

Tickets edited, retrieved, and updated in the specified time

Tickets edited, retrieved, and updated within 5 seconds of entry

Low

S-6.1

Performance Test

The specified number of users can access the system

256 Users can access the application at a time

High

S-7

Compatibility

The application can run across multiple platforms

The application will run on all major platforms. (Windows OS, Apple OS, IOS, Android)

High

S-8

GUI appearance

User friendly GUI

User can quickly identify and access the requested features

Med

S-9

Security

Codes prevented

Users will not have the ability to run code in the requested entries

High

Regression Testing

Regression testing will consist of two phases:

Phase 1 (Partial Test) – When a new update/feature when added to the system, the team will test the modules it directly affects. This will help identify early bugs and errors. If the test results in no errors, then the full testing won’t happen. If bugs/errors occur or if the system fails to operate after, we will proceed to phase 2 testing.

Phase 2 (Full test) – The system test, will help identify bugs/errors across the entire system.

Quality metrics

Introduction

First, a quality metric is an objective measure of a product or processes quality. Using quality metric measurements will allow the user to quantify the quality of a product and or process, which is comparing it to a value. There are several quality metrics that developers use in the development of products, processes, and projects. The type of quality metric that the team will use in this project are as follows:

Product quality metrics

· Mean time to failure

· Defects

· Customer issues

· Customer Pleasure

Process quality metrics

· Defects during network testing

· Defect arrival pattern during network testing

· Phase defect removal

· Effectiveness of defect removal

System Defect Analysis

The main source of input for system defects or irregularities will be the internal Quality Assurance Team, the idea is to catch any major defects with the system before the users of the system notice them. If a User reports a defect, it’s given a higher prioritization for repair than one reported by the internal team. This is to fix any issues in the practical function of the program, allowing business to continue to operate with minimal impact from system errors (Ivanova, 2019).

To assist the quality assurance team in their task of examining the system for potential defects, there are several formulae that will help compare the system’s current performance to ideal thresholds. These will also assist in informing other quality metrics like the total bug count, the defect removal efficiency rate or DRE and the Bug burn down (the projected amount of time to close out all remaining bugs in the system).

Tracking the DRE will show how effective the QA team is at removing bugs from the product before they effect the experience of the end user, represented as a percentage. The Calculations made by taking the number of bugs found in development and dividing that by all the bugs found in both production and development then multiplying by 100 to get the percentage of DRE (Arnold, 2019). Keeping track of this number will give a good representation of the team’s ability to get ahead of potential issues as well as provide valuable data on bug burn down, BBD.

BBD is a projection used to determine the potential length of time the QA team will need to research and fix open bug tickets, based on the average closure amount over the previous lifecycle of the project (Data, 2017). If there are 100 open bug tickets and after 5-weeks, 10-tickets closed per week, you could average it would take another 5 weeks to finish the bug tickets. If the project has a completion date within 4 weeks, you could use that project to assign extra resources to accomplish the task sooner.

Measuring the fixed defects percentage will also assist in tracking the success of the QA team in repairing the bugs reported by users or QA testers and should be under review by management to determine overall quality and success. Calculations made by dividing defects fixed by defects reported and multiply by 100 to get the percentage.

Software Defect Report Template

Summary

Summarize the bug in under a paragraph. i.e. I can’t use the ticketing system

Description

Describe the issue in greater detail, including the time of day, terminal number, employee access number and accomplished

Build/Platform

This could represent the Ticketing system, the ticket forwarding system, the VoIP or the applications for automated workflow or updater

Steps to reproduce

Include everything that needs to replicate the order of process that got the user to the error in question.

Actual results

After preforming the action, what exact message or error did the terminal provide, if any

Expected results

What was the intended action trying to preform? Reference report numbers or work schedules for faster results

Reporter of Defect

Is the defect report from a user or employee; include contact information where available

(Reichert, 2019)

Risk management strategies

Risk Management

The likelihood of damage, threat or hardship and some other mischief realized by inside or external liabilities is known as a risk. It is powerlessness where neither the probability nor the technique for occasion is known (Jacoby and Kaplan, 2013). Various sorts of risks can occur in an undertaking. These are; cost perils, plan threats, and the introduction risks. Despite the way that there are others that can happen, these are the most generally perceived ones. Errand threats consolidate both internal perils and the risks which are insane.

Positive risk is a questionable circumstance that prompts a gainful result. A negative risk then again is one that outcomes in a misfortune (Doherty, 2000). Cost, execution, preparing, plan and legally binding dangers are overall negative dangers. They are dangers instead of chances

Risk Register

Utilized for recording risks, is a risk register, the guides made against that risk and the administration of each risk (Funtowicz and Ravetz 2010). The register is basic to fruitful administration of dangers. Likelihood and effect lattice are the way toward surveying the probabilities and significances of dangers when they occur. Each risk evaluated on its probability of event and the effect on a target on the off chance that it occurs. It very well may be in use in my task to characterize the degree of the dangers that can emerge and the likelihood against the outcomes of the dangers. It can combine both parts onto a similar scale.

Example:

Risk Category

Description of Risk

Potential of Risk

Cost

Different views on needs requirements

Delay of Project

Additional Cost

Performance

Software not delivering expected results

Revising plan could cause delays and cost

Schedule

Hardware and software Issues

Increase Cost

Schedule Delays

Contractual

Terms of Contact

Possible Incurred Additional Cost

Risk Source

Risk Source

Description

Risk Repository

History data containing the rundown of perils recognized for wrapped up wanders. This will be in use to arrive at a rundown of potential threats for the undertaking.

Checklist Analysis

The risk recognizable proof checklist could be a survey that makes a difference recognizes crevices and potential dangers. It’s created based on involvement and extend sort.

Expert Judgement

Risk recognizable verifications moreover done by conceptualizing with or assembly experienced individuals, accomplices, and subjects matter masters.

Project status

The project status joins status assembly reports, status reports, development reports, and quality reports. These reports give the current venture development, issues gone up against, and edge encroachment. These allow understanding into the status of the assignment and potential chance risk.

Project Risk Analyses

Qualitative

Impact rating

A=high (rating 100)

B=medium rating (rating 50)

C=low (low rating 10)

Probability occurrence (in percentage)

A= 80-100

B= 60-80

C=30-60

D=0-3

Quantitative

Risk event

Probability of Occurrence

Potential Impact

The equipment changes will take an extra week

100%

B 50

The unused software program and network changes will be delay due to equipment issues.

100%

B 50

At certain level, the client affirms the half highlights portrayed within the item but educates the firm of other extra necessities

80%

B 45

Conclusion

Risk in a development project is unpreventable. As much as one may prepare totally, certain perils may happen due to unavoidable conditions. Perils either present minute or long stretch to the security of the people, prosperity and condition, are immaterial. This risk could either have a negative or constructive outcome on the endeavor if it occurs. It may have in any event one reason and besides at any rate one impact.

The strategy of risk management the board is a total commitment (Froot, Scarfstein and Stein, 2013). The legally binding specialists and the assignment group need to work inseparable to ensure that the vulnerabilities reduced or oversaw appropriately. The critical responses to risks join controlling, enduring, help, move, sharing, avoiding improving and abusing.

(Week 3) Section 8: Documentation plan

User Documentation

Upon completion of the product, a manual for the network admins will be created and disseminated via email. This document will provide the user with the ability to know the ins and outs of the network and how to troubleshoot the system if need be. We believe that the document should be given out via email and a hard copy should also be produced in case of a situation where the admin does not have access to the computer to complete the troubleshoot. Timeline for product dissemination is after the December 17th date but further down the line where the project is also complete, preferably a week after product completion to give time to make edits to the document.

The end user manual is the most detailed manual that we have decided to create. It does into full detail on how to operate, troubleshoot, install, and perform routine maintenance. This document has a completion date of December 17th, 2019 as well. However, dissemination will not begin until the project is complete, and all tests have passed audits. This manual will need to be in review and tested for cohesiveness in order to pass the requirements expectation. Once that is complete, we expect the document to be ready for release about a month before launch of new system.

Document Control Plan Maintenance

The purpose of this Document Control Plan for the company ISI is to keep accurate records on the current and past methodologies, used during the creation and maintenance of the current hardware systems being used. This should include a list of personnel that have or continue to make changes to the system. The plan should be reviewed annually to keep current with advancing technology and evolving business practices.

Sections that are currently being worked on will be identified by a version number, time stamp and an employee code to identify and trace the work being done. Official Documentation should be marked as such, with signatures on approvals updates or changes being made only by the project team’s lead. Changes to documents should be marked to identify physical or electronic to update the appropriate area and track any changes being made (F, 2018). An additional table of contents should be provided for any sub along with image and video references in the sections where applicable.

Document creation, updates or approvals will be performed by the Network System Administrator and authorized then released by the Management. The IT staff will be responsible for the completion and hard copy storage of new materials. Management will determine what information is accessible to the different versions released to different Users.

The categories of documents include but are not limited to Project Administration, Presentations, Cost Analysis Breakdown, contracts, employee assignments, version tracking, help sections and research materials.

The Storage of the documents, once created, will be handled by management to ensure the secure storage of sensitive materials. Hardcopies stored will also include any official project materials, including contracts, contacts proposals and licenses. Electronic Versions will include copies of the materials above, and will be identified clearly by name, date, version number and uploader. These will be materials will be sub sectioned by project folders in the database that will be clearly identified by the Projects name and subsequent version.

The different versions of documentation will be maintained in the same manner by staff, though the availability of information in the documents will be different. Management will be provided with the complete contents of the documents provided, including any sensitive or proprietary information to be able to formulate administrative or financial changes and respond to various interests. Network System Administration, or NSA will be provided a document oriented at the system itself, with less emphasis on financial interests and sensitive information not directly impacting the projects operations (Akinci, 2010). With multiple clearance levels on the NSA staff, each employee login will provide the appropriate clearance to view the sections needed for that job code. Policies, procedures and included forms are

End Users will be provided the least technical documentation on the back end of operations with a focus on the appropriate uses and available functions of the systems applications. The emphasis is instead placed on the order of operations and the types of information the system can process. The help section should also be more robust with outside reference materials, training videos and help contacts.

Document Control Plan Updates

Management will be able to manually submit requests for updated project information at any time. In addition, weekly scheduled project reports will be provided during the projects inception and monthly maintenance session reports to track scheduled or emergency changes made to the system by the NSA or IT support team. Once completed the updated version link will be sent to those with appropriate access for review and release. New additions to the hardcopy files should be added into the existing files by management and tagged to the applied version.

Network System Administration is responsible for assigning IT associates to the completion of the project reports required. Once completed, the documents will be reviewed for accuracy of information and conformation to the document control standards. This should include, associates name and title, a summary of the reported work, the information changed, the date and the version number. The associate will alert their admin by email when the work is completed to be complied into the new version.

End Users will be alerted by email or program startup when a new version of the help or instructional documents are changed or updated. The updates and changes to the User Documents will be scheduled for once every six months, to be made by the IT support team, following the procedures outlined above. The NSA will approve, or request changes then the contact will be put into place by the Management to ensure the security, availability and accuracy of the materials supplied.

User Document Templates

Documentation for Management

To: Management

From: Connie Farris and Development Team

Date: 12/02/2019

Subject: Design Plans

We have created this document to inform all management involved in the development project the steps we will be using to provide a system that meets all the requirements and needs of the company and the end-users.

After serious discussion, the development team have decided to use the Waterfall Methodology for this endeavor. Some of the main reasons we will use this method are the following:

· Timescales are kept

· No money related shocks

· Testing is made simple

· The result is precious stone clear

· Bargain with issues within the plan

· What you arrange is what you get

Waterfall takes after a straightforward structure of stages where the comes about of each stage cascade down to the following level of advancement. (Kienitz, 2017) In other words, we’re not so much looking at one huge Niagara Falls, but an arrangement of cascading waterfalls – each with their claim small pool of exercises.

Processes

The process documents offer guidance to the development, testing, maintenance and improvement of the systems. The process documents are normally used by managers, engineers, testers and the marketing professionals.

Administration will utilize this program for ticketing framework, ticketing computerization sending framework, VoIP framework for out of nation calls, conveying workflows and dealing with auto upgrades and straightforward to halfway patches. The conclusion clients are not interested to get it the application profoundly, but to know for performing any of the above-mentioned assignments.

The description document which provides the necessary information on the system requirements and the services offered this document is detailed information regarding the software. The end users should read through the provided introductory manual to determine whether it is the required software. The following is a draft of the description document. Revision History

Date

Version

Description

Author

<04/13/year>

<1.0>

SRS 1.0

Group-1

<04/15/year>

<2.0>

SRS 2.0

Group-1

<04/15/year>

<3.0>

SRS 3.0

Group-1

<04/16/year>

<4.0>

SRS 4.0

Group-1

This document will be distributed by sending a copy of the document to each software user either through email or inform of a hard copy by packing together with the software. The maintenance of this document can be ensured through filing or saving in email for easier retrieval.

Secondly is the configuration which is either developed for the system administrator or the end user. This document clearly shows how to configure the software for end use. For the system design or the configuration document, it should have the following in components;

The configuration or system design document will be distributed through the packaging materials for the software or rather sending a softcopy to every software user.

The user guide will be distributed through packing or sending through the software. It should be accompanied with the software either through in form of soft copy or through a hard copy to enable the users to understand how to safely and correctly use the software.

The final section entails information for possible cost and configuration timelines

Costs

I would suggest standard server and information center version. This can be included by two virtual OSE. The authorizing show is processor+. The server estimating for this version goes for $890. Information center version goes for $1000. Equipment prerequisite as recorded over will account up to $1000 whereas computer program necessity will go up to $500. Significate cost could be experienced within the staff required for the usage. With this the cost could increase to about $2000

Duration to complete each task

The table shows project plan for full implementation of c

Task name

Duration

Introductory Arranging

4 days

Windows 7 arrangement to desktops (Stanek, 2013).

6 days

Windows server Establishment (Stanek, 2013).

3 days

Introduce windows server overhauls

2 day

Install virtual server

3 days

Introduce windows 7 overhauls

2day

Customize client computers

2 day

Make application bundles

2 days

Test windows 7 arrangement(Stanek, 2013).

1 day

Arrangement of client computers with server

2 days

Testing of entire client/server framework

3 days

Finalize and provide documentation

1 days

The development team and I hope this document will provide you with the information to assure we are committed to providing you with a design that has all the requirements and needs that will prove it`s worth for now and in the future. Any questions please feel free to contact us at 1-800-596-1582 or at [email protected]

Systems/Network Administration Manual Template

Galactic IT Services

3062 Argyle RD1

Gainesville, Florida

32609

USA

Tel: 352-376-5555 Fax: 352-351-5555

Last edited: 08 December 2019

Copyright © 2019 Galactic IT Services. All rights reserved.

No part of this publication may be reproduced, transmitted, transcribed, stored in a retrieval system, or translated into any language, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from Galactic IT Services

All copyright, confidential information, patents, design rights and all other intellectual property rights of whatsoever nature contained herein are and shall remain the sole and exclusive property of Galactic IT Services. The information furnished herein is believed to be accurate and reliable.

However, no responsibility is assumed by Galactic IT Services for its use, or for any infringements of patents or other rights of third parties resulting from its use.

Running Head: PLANNING & DEVELOPING A PROJECT 1

PLANNING & DEVELOPING A PROJECT 2

:

Document Name: System Administration Guide

© Galactic IT Services 2019. All rights reserved. Page 6 of 35

Document History

Document History will be recorded here, however there are no documents to place here as of yet.

Revision History

Any time a document is revised it will be recorded in the table below.

Revision Number

Revision Date

Summary of Changes

Author

Reference Documents

Please see the following documents for more information:

Document Name

Version

Author

Distribution List

This document has been distributed to those listed in the table below:

Name

Position

Company

Action

Introduction

This System Administrator Guide provides information on how set up, configure, and deploy the System/Network application for research, development, and instructional use. The Systems Administration Guide serves the purpose of an Operations Guide in distributed client/server applications.

Purpose and Scope

Audience and Assumptions This section introduces and describes the purpose of the Systems Administration Guide, the name of the system to which it applies, and the type of computer operation.

This guide is intended to assist System/Network Administrators in securing workstations, mobile computers, and computers within managed environments and should not be applied throughout an enterprise unless trained and competent System/Network Administrators are available on the staff.

System Administration Tasks

This section introduces and describes the purpose of the Systems Administration Guide, the name of the system to which it applies, and the type of computer operation.

The System Administrator's tasks include:

· Backing up and loading databases

· Changing the password of any account

· Creating server login accounts, which includes assigning initial passwords

· Creating user databases and granting ownership of them

· Creating, granting, and revoking user-defined roles

· Diagnosing and reporting system problems

· Fine-tuning [Server] by changing configurable system parameters

· Granting and revoking the Security Officer and Operator roles

· Granting and revoking the System Administrator role

· Granting permissions to [Server] users

· Granting the capability to impersonate another user throughout the server

· Managing disk storage

· Managing the audit system

· Modifying and dropping server login accounts

· Monitoring [Server]'s automatic recovery procedure

· Security Officer - who performs security-related tasks such as:

· Setting the password expiration interval

· Setting up [Server] to use network-based security services

· Setting up groups which can be used for granting and revoking permissions)

System/Network Administration Roles

Many of the commands and procedures discussed in this guide require the System/Network Administrator or Security Officer role. Other sections are relevant to Database Owners. A Database Owner's user name within the database is "dbo". Various security-related, administrative, and operational tasks are grouped into the following system roles:

System/Network Administrator

By default, the System Administrator (the SA) has the following roles:

· sa_role

· so_role

· oper_role

Operator

An Operator is a user who can back-up and load databases on a server-wide basis. The operator role allows a single user to use commands to back up and restore all databases on a server without having to be the owner of each one. These roles provide individual accountability for users performing operational and administrative tasks. Their actions can be audited and attributed to them.

Relationship to Other Plans

Document relationships are recorded in the table below

Resource Name

Purpose

Location

Functional Requirements

[version]

[author]

Operations Guide

[version]

[author]

Configuration Management Plan

[version]

[author]

Software Quality Assurance Plan

[version]

[author]

System Overview

This section will provide a brief description of the system, including its purpose and uses.

System Software

Below will be the description of the overall system software and organization.

· List the software modules, programming languages, and development tools.

· Describe all software required to support the system, and specify the physical location of all software systems.

· Identify database platforms, compilers, utilities, operating systems, communications software, etc.

· Identify each software system, subsystem, and program by name, description, and documentation references.

#

Software

Description

1

[name of software]

2

[name of software]

3

[name of software]

Network Communications Architecture

In this section the communications within the system, such as Local Area Networks (LANs), buses, etc. will be described. Included will be the communications architecture(s) being implemented, such as VoIP, Point to Point, DS3, etc.

A diagram will be provided depicting the communications path(s) between the system and subsystem modules.

Site Profile

Site Location

This is the official address of the site(s).

Site Contacts

Primary Site Contacts

Primary Contact

Role

Phone

Email

Secondary Site Contacts

Secondary Contact

Role

Phone

Email

System/Network Administration

This section covers procedures for maintaining the file system.

Shutting Down a System

Guidelines for Shutting Down a System

When to Shut Down a System

Reason for System shutdown

Appropriate Run Level

To turn off system power due to anticipated power outage 

Run level [X]

To change kernel parameters in the /etc/system file

Run level [X]

To perform file system maintenance

Run level [X] 

System Shutdown Commands

Command

Description

When to use

shutdown

An executable shell script that calls the init program to shut down the system.

Recommended for servers operating at run level because users are notified of the impending shutdown.  

init

An executable that kills all active processes.

Recommended for stand-alone systems when other users will not be affected. 

reboot

An executable that passes boot instructions to the admin system call.

The init command is the preferred method.

poweroff

An executable that synchronizes the disks and stops the processor.

Not recommended because it doesn't shutdown all processes and unmount any remaining file systems. 

How to Shut Down a Server Unix based system

1. Become super-user or assume an equivalent role.

2. Find out if users are logged in to the system.

3. Shut down the system.

Turning Off Power to All Devices

You need to turn off power to all system devices when you:

· Replace or add hardware.

· Move the system from one location to another.

· Prepare for an expected power outage.

Turn the power off for system devices, including the CPU, the monitor, and external devices such as disks, tapes, and printers.

Starting Up a System

Use this procedure to boot a system that is currently at run level to run level. This run level is used for system maintenance tasks, such as backing up a file system.

1. Boot the system to run level [x].

2. Type the super-user password.

3. Verify that the system is at run level [x].

Monitoring Performance and System Activity

This is where the procedures to monitor system usage, performance, and activity will be kept. Installing Programs and Operating System Updates

Maintaining Audit Records of System Operation

This is where the procedures for the setup and monitoring of the operating system and application audit trail will be entered

Maintenance Reports

This is where the procedures to create and update maintenance reports are kept

User and Group Accounts

· System Administrators have access permissions on all systems objects at all times.

· Network Administrators have access permissions on all network objects at all times

· Security Officers can always access the audit trail tables in the security database.

User Types and Privileges

The system will recognize the following types of users:

Type

Privilege

System Administrators

Describe privilege

Network Adninistrators

Describe privilege

Security Officers

Describe privilege

Operators

Describe privilege

Other users (also known as "public")

Describe privilege

System/Network Administrator privileges

System/Administrator’s privileges. Will be entered in the table below

Privilege

Impact on other users

Describe privilege

Describe privilege

Describe privilege

Adding/Deleting User Logins

A description of the procedures for creating and deleting user logins and password accounts will be recorded in the table below

#

Action

1

2

3

Adding New Users

· Security Officer uses will use a command setup for them to create a server login account for a new user.

· System/Network Administrator will use a command set for them to add a user to a database.

· Security officer grants specific roles to the user.

This table summarizes the system procedures and commands used for these tasks.

Task

Role

Command or Procedure

Database

Create new logins, assign passwords etc

Identify Role

Enter command

Identify database

Create groups

Identify Role

Enter command

Identify database

Create and assign roles

Identify Role

Enter command

Identify database

Add users to database

Identify Role

Enter command

Identify database

Grant permissions

Identify Role

Enter command

Identify database

Setting User Permissions

Task

Required Role

Command or Procedure

Database

Adding/Deleting User Groups

Task

Required Role

Command or Procedure

Database

Changing User Information

Task

Required Role

Command or Procedure

Database

Change default database

Identify Role

Enter command

Identify database

Change default language

Identify Role

Enter command

Identify database

Change default settings

Identify Role

Enter command

Identify database

Changing User passwords

#

Action

1

2

3

User Roles/Responsibilities

Role

Responsibility

Enter role type

Describe the responsibilities assigned to this role

Enter role type

Describe the responsibilities assigned to this role

Enter role type

Describe the responsibilities assigned to this role

Dropping Users / Groups

Task

Required Role

Command or Procedure

Database

Drop user from database

Database Owner or System Administrator

Enter command

Enter database

Drop group from database

Database Owner or System Administrator

Enter command

Enter database

Server Administration

The procedures to setup servers, including naming conventions and standards will be written up here.

Creating Directories

The procedures to create server directories; identify the existing directories will be written here.

Building Drive Mappings

The procedures to create server drive mappings; identify existing drive mappings will be written here.

Server Resources

A description of how to use resource limits to restrict the I/O cost, row count, or processing time that an individual login or application can use during critical times. A resource limit is a set of parameters specified by a System Administrator to prevent an individual login or application from:

· Exceeding estimated or actual I/O costs, as determined by the optimizer

· Returning more than a set number of rows

· Exceeding a given elapsed time

The set of parameters for a resource limit includes the time of day to enforce the limit and the type of action to take. This information will be provided in the table below.

Use the system parameters to:

#

Action

1

Specify the name of the user or application to which the resource limit applies.

2

Specify the type of limit and set an appropriate value for the limit type.

3

Specify whether the resource limit is enforced prior to or during query execution.

4

Specify numeric values for this parameter.

5

Specify the action to be taken (e.g. issue a warning, abort the query batch, abort the transaction, or kill the session).

6

Specify numeric values for this parameter.

7

Specify the scope (query, query batch, or transaction).

Printer Administration

This section discusses procedures for installing, operating, and maintaining printers.

Maintenance

This section will be used to describe maintenance contracts, procedures to include installation and configuration of printer drivers, and equipment information.

Print Jobs

This section will be used to describe procedures to monitor, delete, and prioritize print jobs. Setting up local printers

· Setting up print servers

· Setting up print clients

Requirements for Print Servers

· Spooling directory space of 8MB (or more)

· Hard disk strongly recommended (not required)

· Memory of 12MB (or more)

· Swap space of 20 to 24MB (or more)

Printer Configuration Information

Below is the how to configure a printer on the network, you will need the following configuration information ahead of time.

· Serial (or parallel) device name (required), for example /dev/xxx.

· Unique name for the printer (required).

· Printer type (required).

· Type of file content (required), for example, PS for PostScript, simple for ASCII, or both.

· Print server's Internet Protocol (IP) address in universal address format

· The description of the printer to convey to users (recommended, optional)

· The default printer for each system (recommended, optional).

Setting up Local Printers

Steps for setting up local printers.

1. Step 1

2. Step 2

3. Step 3

Setting up Print Server

Steps for setting up print servers.

1. Step 1

2. Step 2

3. Step 3

Setting up Print Clients

Steps for setting up print clients.

1. Step 1

2. Step 2

3. Step 3

Security Procedures

Below is the process for obtaining identifications (IDs) and passwords. Include information concerning network access and confidentiality requirements.

Security Features

Feature

Description

Access Controls

Provides access controls that give object owners the ability to restrict access to objects, usually with the grant and revoke commands.

Identification and authentication controls

Ensures that only authorized users can log into the system.

Division of roles

Allows you to grant privileged roles to specified users so that only designated users can perform certain tasks.

Network-based security

Provides security services to authenticate users and protect data transmitted among machines on a network.

Auditing

Provides the capability to audit events such as logins, logouts, server start operations, remote procedure calls, accesses to database objects, and all actions performed by a specific user or with a particular role active.

Security Procedures

Task

Description

1. Install server

This task includes preparing for installation, loading files from your distribution medium, performing the actual installation, and administering the resources that are required.

2. Set up a secure administrative environment.

This includes enabling auditing, granting roles to individual users to ensure individual accountability, and assigning login names to System Administrators and Security Officers.

3. Add user logins to the server; add users to databases; establish groups and roles; set proxy authorization.

Add logins, create groups, add users to databases, drop and lock logins, and assign initial passwords. Assign roles to users, create user-defined roles, and define role hierarchies and mutual exclusivity of roles.

4. Administer permissions for users, groups, and roles.

Grant and revoke permissions for certain SQL commands, executing certain system procedures, and accessing databases, tables, particular table columns, and views.

5. Administer the use of remote servers.

Establish and administer the access that is permitted between servers, add and drop remote server access, and map remote login names to local login names.

6. Set up and maintain auditing.

Determine what is to be audited, audit the use of [server], and use the audit trail to detect penetration of the system and misuse of resources.

7. Set up your installation for network-based security services.

Configure the server to use services, such as unified login, data confidentiality with encryption, data integrity, and determine security for remote procedures.

Guidelines for setting up security

Using the "sa" login

When [server] is installed, a single login called "sa" is configured with the System Administrator and Security Officer roles. This means that the "sa" login has unlimited power.

Use the "sa" login only during initial setup. Instead of allowing several users to use the "sa" account, establish individual accountability by assigning specific roles to individual administrators.

Changing the "sa" Login Password

The "sa" login is configured initially with a "NULL" password. Use sp_password to change the password immediately after installation.

When to enable auditing

Enable auditing early in the administration process so that you have a record of privileged commands that are executed by Security Officers and System Administrators. You might also want to audit commands that are executed by those with other special roles, such as operators when they dump and load databases.

Assigning login names

When assigning [server] login names that are the same as their respective operating system login names, it makes logging in to the [server] easier, which simplifies management of the server and operating system login accounts and makes it easier to correlate the audit data generated by the [server] with that of the operating system.

Network Based Security

The server will provide network-based security services that enable you to authenticate users and protect data transmitted among machines on a network. In a distributed client/server computing environment an intruder can view or tamper with confidential data. With the server, you can use security services provided by third-party providers to authenticate users, encrypt data, and prevent data tampering.

· Unified login - use a security mechanism to authenticate users once without requiring them to supply a name and password every time they log in to an [server].

· Message confidentiality - encrypt data over the network.

· Mutual authentication - use the security mechanism to verify the identity of the client and the server.

· Message integrity - verify that data communications have not been modified.

· Replay detection - verify that data has not been intercepted by an intruder.

· Out-of-sequence check - verify the order of data communications.

· Message origin checks - verify the origin of the message.

· Remote procedure security - establish mutual authentication, message confidentiality, and message integrity for remote procedure communications.

Setting Up Passwords

The passwords helps prevent access by unauthorized people. When you create the password, follow these guidelines:

· Do not use information such as your birthday, street address, or any other word or number that has anything to do with your personal life.

· Do not use names of pets or loved ones.

· Do not use words that appear in the dictionary or words spelled backwards.

· The most difficult passwords to guess are those that combine uppercase and lowercase letters and numbers. Never give anyone your password, and never write it down where anyone can see it.

Follow these rules to create a password:

· Passwords must be at least 6 bytes long.

· Passwords can consist of any printable letters, numbers, or symbols.

· Includes any character other than A-Z, a-z, 0-9,_, #, valid single-byte or multibyte alphabetic characters, or accented alphabetic characters

· Begins with a number 0-9

License Agreements

Describe the licensing agreements and procedures for ensuring that all licenses are current.

The [application] allows a System Administrator to monitor the number of user licenses used in [Server] and securely manage the license agreement data. That is, you can ensure that the number of licenses used on your [Server] does not exceed the number specified in your license agreement. The [application] tracks the number of licenses issued; it does not enforce the license agreement.

How to count licenses

A license is the combination of a host computer name and a user name. If a user logs in to [Server] multiple times from the same host machine, it counts as one license. However, if the user logs in once from host A, and once from host B, it counts as two licenses. If multiple users log in to [Server] from the same host, but with different user names, each distinct combination of user name and host name is counted.

Backup Procedures

The System Administrator is responsible for ensuring the continued integrity of information stored on the system. One way the system administrator maintains integrity is to back-up the data on the system periodically so that the data can be restored if it is lost.

A ‘backup’ is a copy on external storage media, such as disks or tape, of files on your hard disk. A ‘filesystem backup’ is a copy of the files in the root filesystem or another regularly mounted filesystem. Files and filesystems can be damaged, and data can be lost through:

· Power surges and interruptions

· Hardware failures

· User errors (i.e. accidental removal of important files)

You should back up your filesystems regularly, so you have up-to-date copies from which to restore lost data

Describe the procedures for regularly scheduled backups, including program and data storage, and the creation and storage of backup logs.

Maintenance Schedule (Daily, Weekly)

This section describes documented daily and weekly backup schedules and procedures. The procedures should include tape labeling, tracking, and rotation instructions.

Daily Schedule

Task

Mon

Tues

Wed

Thurs

Fri

Sat

Sun

Weekly Schedule

Task

Mon

Tues

Wed

Thurs

Fri

Sat

Sun

Monthly Schedule

Task #

Jan

Feb

Mar

April

May

June

July

Aug

Sept

Oct

Nov

Dec

Task

Task

Task

Task

Running scheduled backups

Before performing a scheduled backup, you might need to format the media.

1. Select the system to back up from the list.

2. Select Run Scheduled from the menu.

3. If necessary, select or enter the correct media device

Running unscheduled backups

1. Select the system to back up from the list.

2. Select Run Scheduled from the menu.

3. If necessary, select or enter the correct media device

Off-Site Storage Procedures

Maintaining Backup Log

Inventory Management

Maintaining Hardware and Software Configurations

Maintaining Floor Plans

Installing Software/Hardware

Maintaining Lists of Serial Numbers

Maintain Property Inventory

Frequently Asked Questions

How do I [enter FAQ]?

Answer:

How do I [enter FAQ]?

Answer:

How do I [enter FAQ]?

Answer:

Appendix

References

Glossary

End-User Manual Template

Title Page

(Week-4) Section 9: Quality Assurance and results of test-case execution

Section 10 – Project closure

QUALITY MANAGEMENT REPORT TEMPLATE

Introduction

Purpose: Quality Management Review

Audience: Stakeholders, Client, and project Team Members

Details: This report will review the progress of all phases of the project.

Galactic Customer IT Services is an IT support company located in Gainesville, FL. They have tasked out a project development team to upgrade their ticketing system, upgrade their VoIP capabilities, and an application to automate workflow, updates, and patches. Galactic Customer IT Services is a well-known client in the IT industry. This document will be in place alongside all other deliverables to produce reports, reviews, and tasks that completed throughout the course of the project.

The Project Manager is responsible for:

• Documenting the client’s requirements, expectations, and constraints for the project.

• Communicating with the client and project design teams

• Ensuring the client’s quality objectives identified and documented.

• Identifying the scope of the project and degerming the needs of the project that include refining the requirements, budgets, and all quality assessments.

The Project Design Teams are responsible for:

• Creating a finished product that meets or exceeds the requirements and constraints that the client has identified.

• Delivering the product with all quality assessments accounted and implemented.

• Taking the appropriate steps to ensure quality is at their level.

• Communicating with the Project Manager with identified risks, time frames, and stage/phase completions.

Requirements

Resources

· This system has an expected employee user usage of 250,000 and 250,000 potential customer users.

· Galactic Customer IT Services has several servers at each location.

· Current system software will have an upgrade after completion of this project.

· Several Remote locations across the country.

· Workstations and VoIP hardware.

· VPN

· Current ticketing system

Design

The client and project manager will review the design before this phase becomes complete. Once the design has an approval, the work starts. Design changes will be minimal to reduce risks such as scope creep.

System Development Methodology

The waterfall method got the approval for use. This methodology will provide detailed documentation throughout the project. The project team is confident is providing all the necessary documentation to ensure the project starts off with as much information as possible. This will help mitigate risks in the later stages of development.

Work Breakdown Structure

The Work Breakdown Structure (WBS) has a place in the Project Plan document. This WBS will need a review and updated during each phase of the project. Future phases may alter this structure and will be update as needed.

Communication Plan

· Daily reports will be available and sent out via email to all team members. This will allow the teams to fully understand the areas that are complete and in progress.

· Weekly reports cover the timeline, budget, main goals for the week, deliverables, and questions or concerns about the previous week.

· Milestone reports has a review period during weekly meetings. These meetings will cover the requirements for completion, completed milestone reviews, deliverable approvals, and project time frames.

· Quality management meetings held weekly to cover the current status of each stage of the project.

· Updates to the communication plan will need approval before any changes made.

 

 

Week 1 – 5. QUALITY MANAGEMENT REPORT

 

 

Week-1

Completion

Pass/Fail

Status

YES

NO

Under Review

Project Requirements

R-1

Ticketing System

X

The Ticketing System will be omni-channel supported. (i.e. phone, email, self-service application, and employee input.)

R-2

Ticket Automation

X

This application will allow ticketing automation. This will allow users to identify their problem and a ticket will auto generate into the system. The system will automatically forward the tickets to the appropriate levels.

R-3

VoIP upgrade

X

The VoIP capabilities will provide telecommunications with the use of a VPN. This will include local and long-distance calling.

R-4

Automated workflow and updates

X

The application will provide the capabilities to create tickets, provide updates and patches to the system.

Unit Case Testing

Description

UT-1

Final ticketing application test with end-user input data which should show up on the monitor and print system.

X

Pass

Project Requirements

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

 

Plan

Do

Check

Act

What’s done

Determining the Requirements and constraints of the project.

Monitoring the requirements at each phase.

Measuring the quality of the requirements

Increasing the quality of the requirements at each stage.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Project development, quality assurance, and sprint phases

 

Resources

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

 

Plan

Do

Check

Act

What’s done

Determining the resources available to the project

Monitoring the resources and to utilize them to the fullest

Determining if the resources are available and the quality of each.

Improve efficiency and effectiveness of the project resources.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

Design

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

 

Plan

Do

Check

Act

What’s done

Determining the appropriate design

Monitoring the design to determine if it meets requirements

Measuring the quality of the design for overall performance to the project

Increase performance when necessary

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

 

System Development Methodology

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the appropriate methodology

Monitoring the chosen methodology

Measuring the quality of each sprint

Increase performance and efficiency of each sprint phase.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

Work Breakdown

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

 

Plan

Do

Check

Act

What’s done

Determining the appropriate Work Breakdown Structure

Monitoring the assigned WBS at each level.

Measuring the performance of each level and their time frames

Alter the WBS as needed to increase efficiency.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

 

Communication Plan

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

 

Plan

Do

Check

Act

What’s done

Determining the appropriate communication plan

Monitoring the effectiveness of the communication plan

Measuring the communication plan for any unused time.

Alter the time allotted for meetings, reports, etc. to produce an efficient plan.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Project development, quality assurance, and sprint phases

Week-2

Completion

Status

 

YES

NO

Under Review

Requirements

R-1

Ticketing System

X

The Ticketing System will be omni-channel supported. (i.e. phone, email, self-service application, and employee input.)

R-2

Ticket Automation

X

This application will allow ticketing automation. This will allow users to identify their problem and a ticket will auto generate into the system. The system will automatically forward the tickets to the appropriate levels.

R-3

VoIP upgrade

X

The VoIP capabilities will provide telecommunications with the use of a VPN. This will include local and long-distance calling.

R-4

Automated workflow and updates

X

The application will provide the capabilities to create tickets, provide updates and patches to the system.

Unit Test Cases

Description

UT-2

Ticketing system network connection test - Data from ticketing system sent to router

Exit criteria Data seen at Router

X

Pass

Description

UT-5

Bandwidth test - Network bandwidth test to meet specifications

Exit criteria

No bottleneck in the network

X

Pass

Description

UT-7

VPN circuit test - Test data reaches remote site from host site-

Exit criteria - Test data arrives at destination site

X

Pass

Requirements

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the Requirements and constraints of the project.

Monitoring the requirements at each phase.

Measuring the quality of the requirements

Increasing the quality of the requirements at each stage.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Project development, quality assurance, and sprint phases

 

Resources

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the resources available to the project

Monitoring the resources and to utilize them to the fullest

Determining if the resources are available and the quality of each.

Improve efficiency and effectiveness of the project resources.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

 

Design

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the appropriate design

Monitoring the design to determine if it meets requirements

Measuring the quality of the design for overall performance to the project

Increase performance when necessary

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

 

System Development Methodology

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the appropriate methodology

Monitoring the chosen methodology

Measuring the quality of each sprint

Increase performance and efficiency of each sprint phase.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

 

Work Breakdown

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the appropriate Work Breakdown Structure

Monitoring the assigned WBS at each level.

Measuring the performance of each level and their time frames

Alter the WBS as needed to increase efficiency.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

 

Communication Plan

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the appropriate communication plan

Monitoring the effectiveness of the communication plan

Measuring the communication plan for any unused time.

Alter the time allotted for meetings, reports, etc. to produce an efficient plan.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Week 3

Completion

Pass/Fail

Status

YES

NO

Under Review

Requirements

R-1

Ticketing System

X

The Ticketing System will be omni-channel supported. (i.e. phone, email, self-service application, and employee input.)

R-2

Ticket Automation

X

This application will allow ticketing automation. This will allow users to identify their problem and a ticket will auto generate into the system. The system will automatically forward the tickets to the appropriate levels.

R-3

VoIP upgrade

X

The VoIP capabilities will provide telecommunications with the use of a VPN. This will include local and long-distance calling.

R-4

Automated workflow and updates

X

The application will provide the capabilities to create tickets, provide updates and patches to the system.

Unit Test Cases

Description

UT-20

Network throughput speed test - Network throughput test to meet specifications – Exit criteria –Network speed to reach specifications

X

Pass

Description

UT -3

ISP Cloud circuit test - Data Test packets set from router – Exit criteria = Data packet arrive at ISP cloud

X

Pass

Description

UT - 8

VoIP connection speed test outbound - VoIP data packets sent to the ISP cloud and the cloud receives it – Exit criteria - VoIP data sent form the cooperate office to the ISP cloud and seen

X

Pass

UT - 9

VoIP data packets sent from the ISP cloud and received - VoIP data packets sent from the ISP cloud and received – Exit criteria - VoIP data packets reaches the cooperate office from the ISP Cloud

X

Pass

UT - 4

DS3 circuit tests - Data test packets sent from host site and remote sites to the ISP – Exit criteria - Data test packets reach destinations

X

Pass

Requirements

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the Requirements and constraints of the project.

Monitoring the requirements at each phase.

Measuring the quality of the requirements

Increasing the quality of the requirements at each stage.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Project development, quality assurance, and sprint phases

Resources

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the resources available to the project

Monitoring the resources and to utilize them to the fullest

Determining if the resources are available and the quality of each.

Improve efficiency and effectiveness of the project resources.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

Design

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

 

Plan

Do

Check

Act

What’s done

Determining the appropriate design

Monitoring the design to determine if it meets requirements

Measuring the quality of the design for overall performance to the project

Increase performance when necessary

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

System Development Methodology

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the appropriate methodology

Monitoring the chosen methodology

Measuring the quality of each sprint

Increase performance and efficiency of each sprint phase.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

Work Breakdown

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the appropriate Work Breakdown Structure

Monitoring the assigned WBS at each level.

Measuring the performance of each level and their time frames

Alter the WBS as needed to increase efficiency.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

Communication Plan

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the appropriate communication plan

Monitoring the effectiveness of the communication plan

Measuring the communication plan for any unused time.

Alter the time allotted for meetings, reports, etc. to produce an efficient plan.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Project development, quality assurance, and sprint phases

Week-4

Completion

Pass/Fail

Status

YES

NO

Under Review

Requirements

R-1

Ticketing System

The Ticketing System will be omni-channel supported. (i.e. phone, email, self-service application, and employee input.)

R-2

Ticket Automation

This application will allow ticketing automation. This will allow users to identify their problem and a ticket will auto generate into the system. The system will automatically forward the tickets to the appropriate levels.

R-3

VoIP upgrade

The VoIP capabilities will provide telecommunications with the use of a VPN. This will include local and long-distance calling.

R-4

Automated workflow and updates

The application will provide the capabilities to create tickets, provide updates and patches to the system.

Requirements

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the Requirements and constraints of the project.

Monitoring the requirements at each phase.

Measuring the quality of the requirements

Increasing the quality of the requirements at each stage.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Project development, quality assurance, and sprint phases

Resources

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the resources available to the project

Monitoring the resources and to utilize them to the fullest

Determining if the resources are available and the quality of each.

Improve efficiency and effectiveness of the project resources.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

Design

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

 

Plan

Do

Check

Act

What’s done

Determining the appropriate design

Monitoring the design to determine if it meets requirements

Measuring the quality of the design for overall performance to the project

Increase performance when necessary

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

 

System Development Methodology

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the appropriate methodology

Monitoring the chosen methodology

Measuring the quality of each sprint

Increase performance and efficiency of each sprint phase.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

Work Breakdown

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the appropriate Work Breakdown Structure

Monitoring the assigned WBS at each level.

Measuring the performance of each level and their time frames

Alter the WBS as needed to increase efficiency.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

Communication Plan

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the appropriate communication plan

Monitoring the effectiveness of the communication plan

Measuring the communication plan for any unused time.

Alter the time allotted for meetings, reports, etc. to produce an efficient plan.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Project development, quality assurance, and sprint phases

Week-5

Completion/Status

Pass/Fail

Statu

YES

NO

Under Review

Requirements

R-1

Ticketing System

The Ticketing System will be omni-channel supported. (i.e. phone, email, self-service application, and employee input.)

R-2

Ticket Automation

This application will allow ticketing automation. This will allow users to identify their problem and a ticket will auto generate into the system. The system will automatically forward the tickets to the appropriate levels.

R-3

VoIP upgrade

The VoIP capabilities will provide telecommunications with the use of a VPN. This will include local and long-distance calling.

R-4

Automated workflow and updates

The application will provide the capabilities to create tickets, provide updates and patches to the system.

Project Requirements

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the Requirements and constraints of the project.

Monitoring the requirements at each phase.

Measuring the quality of the requirements

Increasing the quality of the requirements at each stage.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Project development, quality assurance, and sprint phases

Resources

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the resources available to the project

Monitoring the resources and to utilize them to the fullest

Determining if the resources are available and the quality of each.

Improve efficiency and effectiveness of the project resources.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

Design

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the appropriate design

Monitoring the design to determine if it meets requirements

Measuring the quality of the design for overall performance to the project

Increase performance when necessary

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

System Development Methodology

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the appropriate methodology

Monitoring the chosen methodology

Measuring the quality of each sprint

Increase performance and efficiency of each sprint phase.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

Work Breakdown

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the appropriate Work Breakdown Structure

Monitoring the assigned WBS at each level.

Measuring the performance of each level and their time frames

Alter the WBS as needed to increase efficiency.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Sprints

Communication Plan

Quality Planning

Quality Control

Quality Assurance

Quality Improvement

Plan

Do

Check

Act

What’s done

Determining the appropriate communication plan

Monitoring the effectiveness of the communication plan

Measuring the communication plan for any unused time.

Alter the time allotted for meetings, reports, etc. to produce an efficient plan.

When it’s done

Planning phase: client identified these resources

Project development & quality assurance phases

Project development & quality assurance phases

Project development, quality assurance, and sprint phases

References:

Akinci, U. (2010). How to write a Documentation Plan. Retrieved from https://www.technicalcommunicationcenter.com/online-classes/how-to-write-a-documentation-plan/.

Andrews, M. (2019) The Best 11 Ticketing System Software in 2019. Retrieved from https://blog.hubspot.com/service/it-ticketing-system

Arnold, J. (2019, January 7). 64 Essential Software Quality Testing Metrics for Measuring Success. Retrieved from https://www.qasymphony.com/blog/64-test-metrics/.

Data, N. (2017, November 7). 13 Essential Software Development Metrics to Ensure Quality. Retrieved from https://blog.usenotion.com/13-essential-software-development-metrics-to-ensure-quality-219cfc264ed1.

Dennis, J. (2018). Three unbeatable security advantages of cloud-based solutions for your business. Retrieved from https://www.cloudcomputing-news.net/news/2018/jun/25/three-unbeatable-security-advantages-cloud-based-solutions-your-business

Doherty, N. A. (2000), integrated risk Management: Techniques and strategies for managing corporate risk. New York McGraw-Hill.

Eisenberg, A., (2019.) Does your QA Team Structure Pass the Test. Retrieved from https://igniteoutsourcing.com/it-outsourcing/qa-team-structure-roles-responsibilities/?

F, K. (2018, November 18). Document Control Plan: Introduction, Plan Content, Examples. Retrieved from https://www.brighthubpm.com/monitoring-projects/102112-example-of-a-document-control-plan/.

Froot, K.A., Scharfstein, D.S., & Stein, J.C. (2013) Risk management: Coordinating corporate investment and financing policies. The journal of finance 48, no.5 1629-1658.

Funtowicz, S. O., & Ravetz, J. R. (2010). Three types of risk assessment and the emergence of post-normal science

Guru99, (2019). How to Create a Test Plan (with Example). Retrieved 25 November 2019, from https://www.guru99.com/what-everybody-ought-to-know-about-test-planing.html

Ivanova, I. (2019, November 10). Important Software Test Metrics and Measurements – Explained with Examples and Graphs. Retrieved from https://www.softwaretestinghelp.com/software-test-metrics-and-measurements/.

Jacoby, J., & Kaplan, L. B. (2013). The components of perceived risk. ACR Special Volumes

Kienitz, P. (2017). Pros and Cons of Waterfall Software Development | DCSL Software Ltd. Retrieved 1 December 2019, from https://www.dcslsoftware.com/pros-cons-waterfall-software-development/

Minasi, M. (2014). Mastering Windows Server 2012 R2. Indianapolis: Sybex.

Reichert, A. (2019, January 22). How to write a software defect report. Retrieved from https://techbeacon.com/app-dev-testing/write-software-defect-reports-get-results-boost-credibility.

Rouse, M. (2019, February). waterfall model. Retrieved from TechTarget: https://searchsoftwarequality.techtarget.com/definition/waterfall-model

Spacey, J., (2017.) 14 Examples of Quality Objectives. Retrieved from https://simplicable.com/new/quality-objectives

Stanek, W. R. (2013). Microsoft Windows server 2012 inside out

Telerik. (n.d.). RadEditor End User Manual. Retrieved from https://d31ghwrlt97cgl.cloudfront.net/RadEditorAjaxEndUserManual.pdf

Unknown. (2018.) QA Activities in a Waterfall Process. Retrieved from https://qatestlab.com/resources/knowledge-center/waterfall-process/

Remote Site 1

Remote Site 2Remote Site 3

Remote Site 4 Remote Site 5

Remote Site 6Remote Site 7Remote Site 8

Remote Site 9

Remote Site 10

Gainesville Florida

LosAngeles,Calafornia

ISP

Cloud

ISP

Cloud

T3

T2T2

T2

T2

T2

T2

T2

T2

T2

T2

DS3

DS3

Online Ticketing

Customer Service

Tickets

Persistence

Security

UML Component Diagram: Online Ticketing

order

access

control

encryption

dataAccess

dataAccess

VPN

Internet

Customer