Hydrology Report
CE 421 Hydrology –Project Check 4 Part A Solution Dr. Howe Lim UND Civil Engineering 1
2023 CE 421 Hydrology Course Project
Check 4 Part A
Due: 11/21/2023
A. Preparation for Current Condition Model
Item 1 for submission of Check 4:
The User Specified Unit Hydrograph you entered for the largest sub-basin in Miller Creek Basin. Show the
graphical plot and the table input value of the UH in HEC-HMS. State the storm duration of the UH.
CE 421 Hydrology –Project Check 4 Part A Solution Dr. Howe Lim UND Civil Engineering 2
6, 12 and 24-hr UH for the Largest Sub-basin in Miller Creek Basin
Subbasin-11 Subbasin-11 Subbasin-11
Area (sq mile) 2.038 Area (sq mile) 2.038 Area (sq mile) 2.038
Time 6-Hr UH Time 12-Hr UH Time 24-Hr UH
hr cfs hr cfs hr cfs
0 0.00 0 0.00 0 0.00
6 0.23 12 0.23 12 0.12
12 0.23 24 0.46 24 0.35
18 0.46 36 11.21 36 5.84
24 0.46 48 21.97 48 16.59
30 11.21 60 15.90 60 18.93
36 11.21 72 9.83 72 12.86
42 21.97 84 7.51 84 8.67
48 21.97 96 5.20 96 6.36
54 15.90 108 4.62 108 4.91
60 15.90 120 4.05 120 4.34
66 9.83 132 3.32 132 3.69
72 9.83 144 2.60 144 2.96
78 7.51 156 2.23 156 2.41
84 7.51 168 1.85 168 2.04
90 5.20 180 1.94 180 1.89
96 5.20 192 2.02 192 1.98
102 4.62 204 1.94 204 1.98
108 4.62 216 1.85 216 1.89
114 4.05 228 1.73 228 1.79
120 4.05 240 1.62 240 1.68
126 3.32 252 1.47 252 1.55
132 3.32 264 1.33 264 1.40
138 2.60 276 1.21 276 1.27
144 2.60 288 1.10 288 1.16
150 2.23 300 1.01 300 1.05
156 2.23 312 0.92 312 0.97
162 1.85 324 0.46 324 0.69
168 1.85 336 0.00 336 0.23
174 1.94 348 0.00
180 1.94 186 2.02 192 2.02 198 1.94 204 1.94 210 1.85
CE 421 Hydrology –Project Check 4 Part A Solution Dr. Howe Lim UND Civil Engineering 3
216 1.85 222 1.73 228 1.73 234 1.62 240 1.62 246 1.47 252 1.47 258 1.33 264 1.33 270 1.21 276 1.21 282 1.10 288 1.10 294 1.01 300 1.01 306 0.92 312 0.92 318 0.46 324 0.46 330 0.00
0.00
5.00
10.00
15.00
20.00
25.00
0 50 100 150 200 250 300 350 Time in hours
6-Hr UH For Subbasin 11 (largest, 2.038 sq.miles)
CE 421 Hydrology –Project Check 4 Part A Solution Dr. Howe Lim UND Civil Engineering 4
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
20.00
0 50 100 150 200 250 300 350 400Time in hours
24-Hr UH For Subbasin 11 (largest, 2.038 sq.miles)
0.00
5.00
10.00
15.00
20.00
25.00
0 50 100 150 200 250 300 350 400 Time in hours
12-Hr UH For Subbasin 11 (largest, 2.038 sq.miles)
CE 421 Hydrology –Project Check 4 Part A Solution Dr. Howe Lim UND Civil Engineering 5
cont.
cont.
Item 2 for submission of Check 4:
Show a table of Muskingum-Cunge parameters that you have entered in
your 1st Current Condition model. In your model, click on the menu
“Parameters”, “Routing” and “Muskingum-Cunge”. Use screen shot.
CE 421 Hydrology –Project Check 4 Part A Solution Dr. Howe Lim UND Civil Engineering 6
Three flood hydrographs are expected. Only one is shown as an example here for 6 hour storm simulated outflow at the outlet (junction 6 for this example): Ouflow
or using “Graph”
Item 3 for submission of Check 4:
Show the screenshot of the simulated flood hydrograph at the outlet of your three current condition models.
Tip: In model, click on “Results” under the explorer-type window as shown below, and select the junction that
associate with the basin outlet. Select Outflow and or Graph. Get a screen shot the hydrograph.
- check 1.pdf
- check 2.pdf
- check 3.pdf
- ck4.pdf